TRANSMISSION CORPORATION OF A.P. LIMITED

[1]

PROPOSAL TO STRENGTHEN THE TRANSMISSION SYSTEM-

VISAKHAPATNAM, KADAPA, VIJAYAWADA ZONES.

NOTIFICATION

S.No.

NAME OF THE WORKS

VISAKHAPATNAM DISTRICT

1

Erection of 132/33kV features at 220kV SS Gangavaram Port

2

Stringing of 2nd circuit on 132kV Kasimkota - Chodavaram DC/SC Line

3

Erection of 132/33kV SS for AP Medical Technologies Park (APMTZ) at

Nadupuru SS and connected lines 1)132kV DC/SC Line from 220/132kV

SS Brandix to APMTZ, Nadupuru 2)132kV LILO Line to Gajuwaka -

Parawada SS.

4

Erection of 220/132/33kV GIS SS at Achutapuram with connected 220kV

DC Line from 220kV SS Brandix to 220kV GIS Atchutapuram SS.

5

Erection of 132/33kV GIS SS at Kapuluppada, 132kV DC Line with XLPE

UG Cable from 220kV Diary Farm to the proposed 132 kV GIS SS at

Kapuluppada.

6

Up-gradation of existing 132/33 kV SS Simhachalam to 220/132/33kV

SS with 220kV line for making LILO of Kalapaka - Dairyfarm 2) 132kV

DC line at Simhachalam - Nakkavanipalem.

Registered No. HSE-49/2016

W.No.21

AMARAVATI, MONDAY , MAY 28, 2018

G.152

PART II - MISCELLANEOUS NOTIFICATIOSN OF INTEREST TO THE PUBLIC

--x--

NOTIFICATIONS BY HEADS OF DEPARTMENTS Etc.,

2

ANDHRA PRADESH GAZETTE, May 28, 2018

VIZIANAGARAM DISTRICT

1

Erection of 220/132kV SS Vizianagaram with connected 220kV DC line

for making LILO of 220kV Garividi to Pendurthy line

SRIKAKULAM DISTRICT

1

Erection of 220/132 kV SS at Pydibhimavaram, 220kV DC Line from 400/

220kV Garividi to Pydibhimavaram. 132kV DC Line from 220 kV

Pydibhimavaram SS to Tap point of 132 kV LILO going to the existing

132/33 kV Pydibhimavaram, 132kV DC Line from Pydibhimavaram to

Chilakapalem.

WEST GODAVARI DISTRICT

1

Stringing of 2nd circuit on 132kV Kamavarapukota - Chintalapudi DC/SC

Line

2

Erection of 220/132/33 kV SS at Duvva and with connected lines 1)220kV

line from Vemagiri to Undi,2)132kV line from Nidadavolu to

Tanuku,3)132kV D.C line from Duvva to P.T Palli SS

3

Erection of 220kV DC Line for making L]LO of existing 220kV Vijjeswaram

- Kamavarapukota to 220/132kV SS Nidadavole,

4

Erection of 220kV DC line from 400/220kV SS Kamavarapukota to 220kV

SS Bhimadole

5

Erection of 132kV DC/SC line from proposed 220KV SS Duvva to the

proposed 132/33kV SS Palakollu

6

Erection of 132kV line from Undi SS to Bhimavaram RTSS

7

Erection of 132kV line from Duvva SS to Tanuku RTSS

EAST GODAVARI DISTRICT

1

Erection of 132/33 kV SS at Mumidivaram SS with connected line by

making LILO of 132 kV R.C Puram-AmalajDuram-l Line

2

Erection of 132/33 kV SS at Gollapalem with connected LILO lines from

Kakinada-Yanam

3

Erection of 220/132/33 kV SS at Kakinada SEZ with 220kV DC line form

Samarlakota

4

Erection of 2 nd Ckt from 220kV SS Korukonda to 220kV SS

Rapachodavaram and making LILO to 220kV SS lower Sileru.

KADAPA DISTRICT

1

Erection of 132/33 kV SS at T.Sundupalli with connected from Rayachoti

to T. Sundupalli and Bay extensions at Rayachoti

2

Erection of 132/33 kV SS at Satellite City with connected DC line from

Chinakampalli

3

Erection of 321/33 kV features at 220kV Rajampet SS

4

Erection of 132/33 kV Substation at Brahmamgarimattam, 132kV line from

Porumamilla to Brahmamgarimattam SS

KURNOOL DISTRICT

1

Erection of 33kV features at 220/11 kV Krishnagiri HNSS substation

2

Erection of 132/33 kV SS at Rudravaram with connected from Nandyal -

Allagadda line

3

Erection of 33kV features at 220/11 kV Nansuralla HNSS substation

4

Erection of 132kV line from Nandyala SS to Nandyala RTSS

5

Erection of 220kV line from Somayajulapalli SS to Rangapuram RTSS

6

Erection of 220kV line from Nansuralla SS to Pendekallu RTSS

ANANTAPURAM DISTRICT

1

Erection of 33kV features at 220/132kV Boksampalli HNSS Substation

2

Erection of 33kV features at 132kV Switching station Nagalapuram

3

Stringing of 2nd circuit from 132kV Guntakal to 132kV SS Uravakonda and

making LILO of 132kV Guntakal -Uravakonda line to 220kV SS Vajrakarur

4

Erection of 132/33 kV SS at Palasamudram, APIIC Cluster Stringing of

2nd Ckt on 220kV Gollapuram - Lepakshi with connected 132kV DC line

from Lepakshi to Palasamudram SS

5

Erection of 33kV features at 132kV LIS SS Madakasira

6

Erection of 220kV DC line from Galivedu Pooling Stations 1.2 and 3 to

400kV (PGCIL) N P Kunta SS

CHITTOOR DISTRICT

1

Erection of 132/33 kV Substation at Mangalam and connected 132kV line

from Rachagunneri SS

2

Erection of 132/33 kV SS at V.Kota, 132kV SC XLPE UG Cable from

220/132/33kV SS Palamaneru to V.Kota, 132kV Bay extension

Palamaneru.

3

Erection of 132/33 kV Substation at Pasuparthur, 132kV DC UG Cable

from 220/132/33kV SS Palamaneru, 132 kV Bay extensions at

Palamaneru SS

ANDHRA PRADESH GAZETTE, May 28, 2018

3

4

Erection of 2nd ckt at 132kV SS Chandragiri and 132kV SS Tirumala line

with connected bays at chandragiri and Tirumala.

KRISHNA DISTRICT

1

Erection of 132/33 kV SS at Mylavaram with connected lines from

Kondapalli, 132 kV Bay extensions Kondapalli SS

2

Erection of 132 kV XLPE UG Cable from 132kV SS Vijayawada to

proposed 132/33kV GIS SS Moghalrajpuram , Bay extension at 132kV

Vijayawada.

3

Erection of 132/33 kV at Bantumilli, with connected DC line from

Chigurukota SS and 2nd ckt on Gudivada-Chigurukota line with connected

bays

GUNTUR DISTRICT

1

Erection of 220/132/33kV GIS SS at Lingayapalem (Amaravati) with

connected lines from Podili SS

2

Up-gradation of 132/33 kV SS at Piduguralla to 220/132/33kV SS with

connected LILO line from VTS-Podili lines.

3

Erection of 132kV line from Rentapalla SS to Sattenapalli RTSS

4

Erection of 132kV line from Rentachintala SS to Gurajala RTSS

5

Erection of 132kV DC Line for making LILO of 132kV Tadikonda -

Marripalem feeder to 132kV SS Gujjanagundla

PRAKASAM DISTRICT

1

Erection of 132/33 kV SS Chinnarikatla with connected line from 220kV

Podili SS.132 kV Bay extensions at Podili SS

‘2

Erection of 132/33 kV SS at East Gangavarm with connected line from

Podili SS 132 kV Bay extensions at 220kV SS Podili,

3

Erection of 132/33 kV SS at Ulavapadu with connected line from

Kandukuru SS

4

Erection of 132kV DC line from 132kV SS Kalasapadu, YSR Dist, to

132kV SS Giddaluru

5

Erection of 132/33 kV SS Kothapatnam with connected line from

Ongole SS

6

Erection of 132/33 kV Substation at Elchuru with connected line from

Narasaraopeta SS.132 kV Bay extension at Narasaraopeta SS

7

2nd ckt on 132kV Parchuru to chirala and 2nd ckt on 132kV Parchuru to

Marturu.

4

ANDHRA PRADESH GAZETTE, May 28, 2018

NELLORE DISTRICT

1

Erection of 220/132/33kV SS at Racharlapadu (IFFCO.SEZ) with 220kV

DC LILO Line from Nellore-Ongole line 132kV DC Line from Allur to

Racharlapadu, 132kV DC Line from Kavali — Allur to Racharlapadu SS.

2

Erection of 132/33 kV SS at Gottiprolu with connected line from Naidupet

SS, 132 kV Bay extensions at 220/132kV SS Naidupet.

3

Erection of 220/132/33kV SS at Menakuru / Naidupeta with connected

220kV DC line from 400/220/132kV SS Rachagunneri, 132kV DC line

for making LILO of existing 132kV Naidupeta-Gudur line to 220kV SS

Naidupeta, 132kV DC line from proposed 220kV SS Naidupeta to 132kV

SS Menakuru.

4

Erection of 132/33 kV SS Kadivedu with connected line from 220kV

Manubolu SS

5

Replacement of existing conductor with HTLS conductor in 132kV Nellore-

NV Garderns line and 132kV Nellore-NTS line

In exercise of powers conferred by G.O Ms No.115, dt.07.10.2003 of

Govt.of Andhra Pradesh, APTRANSCO or their authorized representatives shall

have powers for placing of the electric supply lines or electric plant for

transmission of electricity for the purpose telephonic of telegraphic

communications necessary for the proper co-ordination of works that the

telegraphic authority possesses under the provisions of the Indian telegraphic

act, 1885 (Central act-13 of 1885).

Any person interested / aggrieved may make representation to the Chief

Engineer/Construction/APTRANSCO Vidyut Soudha, Vijayawada-520004, within

two months from the date of publication of this notification.

Representations received after the due date will not be considered and

APTRANSCO will take up the above works after due date with/without

modifications as it deems after making enquiry, if necessary

ANDHRA PRADESH GAZETTE, May 28, 2018

5

Published and Uploaded by the Commissioner of Printing, Government of Andhra Pradesh at

Government Regional Press, Vijayawada, www.apegazette.cgg.gov.in

Sd/-.,

Chief Engineer,

Construction,

APTRANSCO,

Vijayawada.

Dated : 21-05-2018.

--x--