PART I EXTRAORDINARY
Registered No. HSE-49/2016
No.142
AMARAVATI, MONDAY, JANUARY 31, 2022
G.977
NOTIFICATIONS BY GOVERNMENT
--x--
Page 3 of 79
Operational Guidelines for
Implementation of Andhra
Pradesh Electronics Policy
2021-2024
Page 4 of 79
1.
Introduction .................................................................................................................................................... 7
2.
Area of Operation ......................................................................................................................................... 7
3.
Commencement and Duration of the Policy ............................................................................................. 7
4.
Definitions ...................................................................................................................................................... 7
4.1. Approved Project................................................................................................................................................ 7
4.2. Approved Project Cost........................................................................................................................................ 8
4.3. BC Enterprise ...................................................................................................................................................... 8
4.4. Break-In-Production ........................................................................................................................................... 8
4.5. CCITEI.................................................................................................................................................................. 8
4.6. Common Facility Centre (CFC) ............................................................................................................................ 9
4.7. Continuous Production....................................................................................................................................... 9
4.8. Date of Commencement of Commercial Production (DCP) ............................................................................... 9
4.9. Date of handing over of land/ shed .................................................................................................................... 9
4.10. Detailed Project Report (DPR)/ Business Proposal ........................................................................................... 9
4.11. Electronics Components Manufacturing .......................................................................................................... 9
4.12. Electronics Industry .......................................................................................................................................... 9
4.13. Electronics Manufacturing ............................................................................................................................. 10
4.14. Electronics Manufacturing Cluster (EMC) ...................................................................................................... 10
4.15. Expansion/ Diversification of Existing Unit ..................................................................................................... 10
4.16. Financial Year ................................................................................................................................................. 10
4.17. First Half Year ................................................................................................................................................. 10
4.18. Fixed Capital Investment (FCI) ........................................................................................................................ 10
4.19. Industrial Area Local Authority (IALA) ............................................................................................................ 10
4.20. Investment Capacity ....................................................................................................................................... 10
4.21. Local employment .......................................................................................................................................... 10
4.22. Mega Project .................................................................................................................................................. 11
4.23. Micro, Small and Medium Enterprises ........................................................................................................... 11
4.24. Month ............................................................................................................................................................. 11
4.25. Nodal Agency ................................................................................................................................................. 11
4.26. Original Fixed Capital Investment .................................................................................................................. 11
4.27. Revised Project Cost ....................................................................................................................................... 11
4.28. SC / ST Enterprise ........................................................................................................................................... 11
4.29. Second Half Year ............................................................................................................................................ 12
CONTENTS
Page 5 of 79
4.30. Women Enterprise ......................................................................................................................................... 12
4.31. Zone A ............................................................................................................................................................ 12
4.32. Zone B ............................................................................................................................................................. 12
5.
Common Procedure for claiming various incentives ............................................................................. 12
5.1. Investment subsidy .......................................................................................................................................... 13
5.2. Reimbursement of Stamp duty, Transfer duty and Registration Fee ............................................................... 14
5.3. Reimbursement of power cost ......................................................................................................................... 14
5.4. Reimbursement of Interest subsidy ................................................................................................................. 16
5.5. SGST reimbursement ........................................................................................................................................ 17
5.6. Reimbursement of Logistics Cost ..................................................................................................................... 18
5.7. Production Linked Incentive (PLI) Scheme ....................................................................................................... 19
6.
Land/ shed allotment for Electronics industry ......................................................................................... 21
7.
Customized Incentive Package ................................................................................................................ 21
8.
Computation of Fixed Capital Investment ............................................................................................... 22
8.1. Land .................................................................................................................................................................. 22
8.2. Factory Building ................................................................................................................................................ 22
8.3. Plant and Machinery ........................................................................................................................................ 23
8.4. Items not computable towards fixed capital investment ................................................................................ 23
9.
General Guidelines ..................................................................................................................................... 24
10.
Ineligibility .................................................................................................................................................... 24
11.
Change of Constitution/ Management/ Name or Style of Industrial Enterprise/ industry ................. 25
12.
Lease of Enterprise/ Industry: ................................................................................................................... 25
13.
Change of location of Industrial Enterprises sanctioned incentives/ concessions: ........................... 25
14.
Merger/ Amalgamation of Industrial Enterprise ...................................................................................... 26
15.
Change of Line of activity/inclusion of Additional line of activities ....................................................... 26
16.
Break in Production .................................................................................................................................... 26
17.
Procedure for sanction of Incentives ....................................................................................................... 26
18.
Recoveries of incentives sanctioned under the Schemes .................................................................... 27
19.
Furnishing of Statement of Account/Information by eligible Enterprises/ industries ......................... 28
20.
Constitution of CCITEI ............................................................................................................................... 28
21.
Powers of CCITEI ....................................................................................................................................... 29
22.
Interpretation ............................................................................................................................................... 29
23.
Penalties ...................................................................................................................................................... 29
Annexure – A ............................................................................................................................................................. 30
Page 6 of 79
Annexure – B ............................................................................................................................................................. 33
FORM 1- COMMON APPLICATION FORM (CAF) FOR REGISTRATION AND SANCTION OF INCENTIVES .................. 35
FORM 2- Investment Subsidy .................................................................................................................................. 43
FORM 3- Stamp Duty / Registration Fee / Transfer Duty Reimbursement Claim Form .......................................... 48
FORM 4 - Power Cost Reimbursement .................................................................................................................... 52
FORM 5 - Interest Subsidy Claim Application Form ................................................................................................ 56
FORM 6 - SGST Reimbursement Claim Form ........................................................................................................... 62
FORM 7 - Transport Subsidy Claim Form ................................................................................................................ 67
FORM 8 - Production Linked Incentive Claim Form................................................................................................. 71
Page 7 of 79
Electronics manufacturing is one of the fastest growing manufacturing industries in the world
with a global production of about USD 2 Trillion (INR 150 Trillion) in 2017-18. While traditionally
countries such as China, South Korea and Taiwan have led the manufacturing output, the
fast-changing trade equations between major economies worldwide are seeing investments
flowing into countries such as India, Malaysia, Thailand, and Vietnam.
The Indian market for electronics goods stood at around USD 118.2 Billion (INR 8.9 Trillion)
in the year 2018-19 and is expected to quadruple to about USD 400 Billion (INR 30 Trillion)
by 2025, driven by the growth in income levels and higher disposable incomes. Mobile
phones, Industrial electronics, Strategic electronics are some of the major sub-sectors in
electronics with growth potential in India. The Electronics System Design and Manufacturing
(ESDM) sector currently provides employment to about 20 lakh people in the country. The
Government of India in its National Policy for Electronics, 2019 highlighted the strategic
importance of electronics manufacturing and set a target to produce 1 billion mobile handsets
by 2025.
Electronics manufacturing sector is poised for rapid growth in Andhra Pradesh (AP). The state
is consistently featuring in the top 3 destinations in India for mobile manufacturing. Major
global firms have started operations in AP. The state is also receiving multiple investment
proposals for setting up of electronics manufacturing firms.
The policy is applicable for the projects which are operating anywhere in the State of Andhra
Pradesh.
The policy will be in operation from 01.04.2021 to 31.03.2024 (inclusive of both dates), with
modifications as may be brought about during the operation of this scheme. The policy will be
applicable to the projects which are approved during the policy period.
Approved project means a project approved by CCITEI under the policy based on the DPR
submitted. A Project under the Policy would be a new business enterprise or expansion of
an existing enterprise which an applicant intends to implement as per an application
submitted under the Policy. The business enterprise could be carried out at one or more
locations.
1. INTRODUCTION
2. AREA OF OPERATION
3. COMMENCEMENT AND DURATION OF THE POLICY
4.1. Approved Project
4. DEFINITIONS
Page 8 of 79
Approved Project Cost means, the cost of the project on different components as approved
by the term loan lending institution or in case of joint financing, by the lead term loan lending
institution. The Appraised Project Cost by the Scheduled Commercial Banks/ Financial
Institutions recognized by Reserve Bank of India for the purpose of sanction of term loan
would be treated as the Approved Project Cost. However, the component of working capital
margin will not be considered for computing investment subsidy for MSEs. In respect of self-
financed projects, the Approved Project Cost will need to be certified by empaneled
Chartered Accountant/ Chartered Engineer and the cost of the individual elements should be
validated by the latest audited financial statements of the firm.
BC enterprise is an enterprise with 100% Backward Class (BC) entrepreneurs. BC
entrepreneur refers to a person hailing from Andhra Pradesh and belonging to BC Category
as notified by the Government of Andhra Pradesh from time to time.
The Electronics industry obtaining incentives should be in continuous production for a period
of six (6) years in respect of MSMEs and eight (8) years in respect of other enterprises from
the DCP failing which all incentives/ concessions sanctioned are liable to be cancelled and
the incentives/ concessions already availed are liable for recovery. In this regard, APEITA
should monitor the progress of these enterprises and submit report to the ITE&C department
on a half yearly basis. Break-in-production up to a period of three (3) years due to the reasons
beyond its control such as shortage of raw-materials, power and change of management,
etc. may be condoned by CCITEI on merits. Any break-in- production will result in extending
the continuous production period requirement, by the period of such a break.
Any break in production during COVID-19 lock down/ natural calamities will be considered
as deemed condonation period.
CCITEI refers to an empowered ‘Consultative Committee for the Information Technology and
Electronics Industry’ constituted by the state Government with the representatives of the
Government and industry, if any.
4.2. Approved Project Cost
4.3. BC Enterprise
4.4. Break-In-Production
4.5. CCITEI
Page 9 of 79
CFC refers to the facility that provides common infrastructure such as packaging and
warehousing, effluent and water treatment plants, testing and certification facilities, 3D
printing facilities, Maker labs, Prototyping facilities, mail room etc.
Continuous production means continuous working of an Electronics industry on approved
lines for a minimum period of six (6) years for Micro, Small and Medium Enterprises (MSMEs)
and eight (8) years for other enterprises without any break in production. If any enterprise is
not in production/ working for more than 90 days continuously, then it shall be treated as
break in production and not in continuous working.
The date on which commercial production has started, as indicated in the UAM/ EM Part –
II/ Part B of IEM/ IL in respect of Micro, Small & Medium Enterprises and Large Industries
respectively, as the case may be and as confirmed and certified by General Manager/Vice
President, APEITA. While confirming/ certifying the DCP of the enterprise by General
Manager/ Vice President, APEITA as stated above, due diligence is to be exercised by
correlating date of purchase of machinery, date of installation, power release and first sale
bill, power bills, Excise duty payment etc. In case of any dispute on DCP between the
Enterprise and the Department, CCITEI will review and its decision is final.
The date on which physical land/ shed possession is given to the project proponent by the
Andhra Pradesh Industrial Infrastructure Corporation (APIIC) or any other authorized agency
nominated by the Government or a legal public/ private entity.
DPR/ business proposal for the purpose of the policy means a detailed business plan
submitted by the applicant seeking approval for a project/ land/ shed/ incentive. The report
should be in a prescribed format containing requisite information along with supporting
documents.
Electronics components manufacturing is defined as the activity of producing specified
basic discrete devices or physical entities that are used in Electronics manufacturing.
Electronics industry refers to the organizations that are involved in activities such as design
and development, manufacture, assembly, testing of electronic finished goods and electronic
components, and servicing of electronic equipment.
4.6. Common Facility Centre (CFC)
4.7. Continuous Production
4.8. Date of Commencement of Commercial Production (DCP)
4.9. Date of handing over of land/ shed
4.10. Detailed Project Report (DPR)/ Business Proposal
4.11. Electronics Components Manufacturing
4.12. Electronics Industry
Page 10 of 79
Electronics manufacturing refers to the activity of assembling electronics finished goods,
assemblies, and sub-assemblies.
Electronics Manufacturing Cluster refers to a dedicated area intended for establishing
multiple electronics industries with common and social infrastructure notified by the
Government. This may include a Greenfield EMC or a Brownfield EMC.
Expansion: Existing Industrial Enterprises, setting up expansion projects, involving
enhancement of Fixed Capital Investment by at least 25% as well as enhancement of
installed capacity by 25% for the same product lines will be eligible for incentives.
Diversification: Existing Industrial Enterprises making investment for a new product, involving
Diversification with an enhancement of least 25% of new fixed capital investment as well as
enhancement of turnover by at least 25%, in value terms (the average turnover of the
previous three financial years will be used for computation) will be eligible for incentives.
1st April to 31st March of next year
1st April to 30th September of the same year
Fixed Capital Investment means investment on land, building, plant, machinery &
equipment assessed as per the relevant section of this document.
Industrial Area Local Authority (IALA) is a body to promote local self-governance of industrial
areas involving the taxpayer’s community in the notified industrial areas in the management/
maintenance of such industrial areas.
Investment capacity means the quantum of proposed investment in the state by an
electronics industry for which the said industry can provide source of funds.
4.13. Electronics Manufacturing
4.14. Electronics Manufacturing Cluster (EMC)
4.15. Expansion/ Diversification of Existing Unit
4.16. Financial Year
4.17. First Half Year
4.18. Fixed Capital Investment (FCI)
4.19. Industrial Area Local Authority (IALA)
4.20. Investment Capacity
4.21. Local employment
Page 11 of 79
Local employment would be defined as per the AP Employment of Local Candidates Act
2019.
Electronics industry/ enterprise with an investment over INR 500 Cr. or employment over
4,000.
Micro, small and medium enterprises are defined as per the Government of India Act.
Calendar Months
Andhra Pradesh Electronics & Information Technology Agency (APEITA) will act as a nodal
agency for implementing the Policy
Investments made on fixed capital assets prior to expansion/ diversification will be treated as
Original Fixed Capital Investment. While computing this Original Fixed Capital Investment,
neither depreciation nor revaluation will be considered. Fixed assets include cost of land, civil
works, plant, machinery, and equipment as per the approved project cost.
If the Project Cost for the self-financed Electronics industries is increasing or decreasing by
not more than 10%, a self-certification of the revised project cost by the enterprise shall be
considered as the revised project cost. If the revised project cost is increasing or decreasing
by more than 10% of Project Cost then it will need to be certified by Chartered Accountant/
Chartered Engineer, empaneled by the Government of Andhra Pradesh, and the cost of the
individual elements should be validated by the latest audited financial statements of the firm.
For enterprises taking a term loan, the revised project cost will need to be certified by the
Scheduled Commercial Banks/ Financial Institutions financing the enterprise and recognized
by the Reserve Bank of India.
SC/ ST enterprise is an enterprise with 100% Scheduled Caste (SC) / Scheduled Tribe (ST)
entrepreneurs. SC/ ST entrepreneur refers to a person belonging to SC/ ST Category as
notified by the Government of Andhra Pradesh from time to time. All non-statutory
concessions granted to S.C. (Hindus) by the State Government including economic support
schemes sanctioned by A.P. Scheduled Castes Cooperative Finance Corporation have
4.22. Mega Project
4.23. Micro, Small and Medium Enterprises
4.24. Month
4.25. Nodal Agency
4.26. Original Fixed Capital Investment
4.27. Revised Project Cost
4.28. SC / ST Enterprise
Page 12 of 79
been extended to Scheduled Caste converts to Christianity and Buddhism as per orders
issued in the G.O.Ms.No.341, Social Welfare (PR) Dept. dated 30.8.1977.
1st October to 31st March of next year
Women enterprise is an enterprise with 100% women entrepreneurs.
Zone A is defined as the brownfield electronic manufacturing clusters (EMC) developed by
the Government of Andhra Pradesh or it’s agencies i.e. EMC -1 and EMC – 2 in Tirupati,
Chittoor district.
Zone B is defined as the greenfield Electronics Manufacturing Clusters being developed by
the Government of Andhra Pradesh or it’s agencies in YSR EMC in Kopparthy, Kadapa
district.
General Rules:
a) Only approved projects of Electronics industry will be eligible for incentives under the
Electronics Policy 2021-24. Companies which do not submit the DPR for project approval
for their project within 6 months from DCP shall not be eligible for incentives.
b) The approved project will be eligible for any incentive only if the electronics industry
commences commercial production/ operation within 3 (three) years from the date of
handing over of land and within one (1) year from the date of handing over of shed to the
enterprise/ industry. However, CCITEI may take a decision extending the timelines based
on valid reasons stated by the industry.
c) Further, only those enterprises which fulfill the following criteria are eligible for incentives:
•
The enterprise should have a registered/ branch office in Andhra Pradesh
•
The enterprise/ their manpower contracting agencies should pay and process
the provident funds (PF) from Andhra Pradesh and pay professional tax to
designated State authorities in Andhra Pradesh
d) The electronics industry which wishes to avail incentives shall file separate claim
application for each of the incentives they are eligible for, through online incentive portal/
application form as prescribed by APEITA, within the stipulated time frame.
e) Any electronics enterprise going for expansion/ diversification, should submit the claim
application separately subject to the conditions stipulated at Para No.4.15, otherwise the
Electronics enterprise will be legally and financially treated as the original electronics
4.29. Second Half Year
4.30. Women Enterprise
4.31. Zone A
4.32. Zone B
5.
COMMON PROCEDURE FOR CLAIMING VARIOUS INCENTIVES
Page 13 of 79
enterprise prior to expansion/ diversification, and the incentives/concessions will be
considered from the DCP of the original electronics enterprise.
f) All enterprises shall submit Common Application Form (CAF) (Form 1) for applying for the
incentives along with relevant form for the specific incentive.
g) The overall incentive amount shall be capped to 50% of FCI for projects in Zone A and
100% of FCI for projects in Zone B. The Incentive disbursement shall not be more than
10% of FCI in each financial year. The incentives under this policy are in addition to any
Government of India incentives which the industrial unit may be eligible for.
S.
No.
Enterprise Category
Zone
% of
reimbursement
Maximum
Limit (in INR)
1
Electronics enterprise
Zone A
20% of FCI
20,00,00,000
2
Electronics enterprise
Zone B
20% of FCI
20,00,00,000
3
Electronics Industry (SC/ ST / BC /
Women enterprises)
Zone A
25% of FCI
25,00,00,000
4
Electronics enterprises (SC/ ST /
BC / Women enterprises)
Zone B
25% of FCI
25,00,00,000
5.1.1. Approved project of an electronics enterprise that has completed 1 (one) year of
commercial production from DCP shall be eligible to apply for investment subsidy and
shall submit their claims in the prescribed application form given at FORM (2) within
six months from the date of eligibility, to APEITA.
5.1.2. The quantum of investment subsidy for different categories and zones is tabulated as
above. The eligible quantum shall be capped to 10% of FCI in a given year. The
balance eligible investment subsidy shall be accrued, if any, shall be disbursed in the
subsequent year (s).
5.1.3. Investment subsidy shall be applicable to all eligible new and expansion/
diversification enterprises, subject to fulfillment of other conditions stipulated.
5.1.4. In case of land and building or shed purchased from existing industry/ enterprise
which has availed incentives, the land and building or shed cost will not be considered
as part of FCI for computing investment subsidy. In case the original unit has not
availed incentives on land and building, the depreciated value of building (excluding
land cost) will be considered as part of FCI for computing investment subsidy. A
certificate on the depreciated value of building, quality, and life of the building by
Chartered Engineer are to be submitted along with the application.
5.1.5. Enterprises applying for this incentive shall be required to submit documentation in
Annexure-A for verification of incentive claims, in addition to the application form.
5.1.6. SC/ ST/ BC enterprises shall submit caste certificates of promoters, issued by the
competent authority, to claim enhanced incentives under this category.
5.1. Investment subsidy
5.2. Reimbursement of Stamp duty, Transfer duty and Registration Fee
Page 14 of 79
S.
No.
Enterprise
Zone
% of
reimbursement
Maximum
Limit
1
Electronics Industry
Zone A
100%
Not Applicable
2
Electronics Industry
Zone B
100%
Not Applicable
5.2.1. To be eligible for the incentive, the enterprise should have completed at least 1
Year of commercial production from DCP and shall submit their claims in the
prescribed application form given at FORM (3) within 6 months of attaining eligibility
to APEITA.
5.2.2. Stamp duty shall also be reimbursed for lease of land/ shed/ building and mortgages
and hypothecations.
5.2.3. Stamp duty will be reimbursed only for the first transaction on the land/building/shed
and subsequent transactions will not be eligible for stamp duty reimbursement even
in case of land purchases in open auction conducted by financial institution.
5.2.4. Stamp duty, transfer duty, mortgages and hypothecations benefits will be applicable
to all eligible approved new projects and expansion/ diversification projects, subject
to fulfillment of the conditions stipulated.
5.2.5. The above benefits shall be admissible up to five times of the plinth area of the factory
building constructed within the approved project cost. However, in respect of
enterprises where the open land requirements would be larger due to the specific
nature of the sector within the electronics industry, CCITEI may consider allowing
land in excess of five times plinth area on a case-to- case basis.
5.2.6. Stamp duty on mortgages and hypothecations paid by an enterprise for availing term
loan from the financial institutions on assessed FCI only would be eligible. This
incentive is not applicable on working capital. If the mortgage deed is registered in
any state other than Andhra Pradesh in favour of any financial institution, then, this
incentive will not be extended.
5.2.7. Enterprises applying for this incentive shall be required to submit documentation in
Annexure-A for verification of the incentive claim, in addition to the application form,
given at FORM (3).
S.
No.
Enterprise
Zone
Reimbursement
Maximum Limit
1
Electronics enterprise
Zone A
INR 1/ unit for 5
years
Overall incentives
capped at 50% of
FCI
2
Electronics enterprise (SC
/ ST / BC / Women
enterprises)
Zone A
INR 1.50/ unit for
5 years
Overall incentives
capped at 50% of
FCI
3
Electronics enterprise
Zone B
Not Applicable
Overall incentives
5.3. Reimbursement of power cost
Page 15 of 79
S.
No.
Enterprise
Zone
Reimbursement
Maximum Limit
(Power is provided
at subsidized cost)
capped at 100% of
FCI
5.3.1. To be eligible for this incentive the enterprise should complete at least 1 (one) year
of commercial production from DCP and shall submit their first claim in the prescribed
application form given at FORM (4) within 6 months from attaining eligibility and for
subsequent claims before 30th September of the following financial year to APEITA.
5.3.2. SC/ ST/ BC enterprises shall submit caste certificates of promoters, issued by the
competent authority to claim enhanced incentives under this category.
5.3.3. This reimbursement is only on the energy consumption (charges for number of units
consumed in KVAH only but not on Contract Maximum Demand (CMD) or any other
charges levied by DISCOMs). Residential and colony power consumption and open
access power is not eligible for reimbursement of power cost.
5.3.4. The reimbursement of power cost shall be applicable to all the eligible new and
expansion/ diversification projects, subject to fulfillment of the other conditions
stipulated.
5.3.5. The power cost reimbursement shall be applicable to the electronics enterprises,
which are utilizing power from DISCOMs and Rural Electrical Companies (RECs).
However, power connection should be in the name of the enterprise.
5.3.6. Reimbursement of power cost will be allowed in case of expansion/ diversification
projects over and above base power consumed. For the purpose of reimbursement,
annual power consumption will be considered. The reimbursement will be made once
in every financial year, but in case actual power consumed during the year is less
than annual base consumption, reimbursement made during any previous period will
be adjusted in future reimbursement. If excess is paid and could not be adjusted in
future claims, it will be recovered under Revenue Recovery Act.
5.3.7. The base annual consumption will be either the average annual power consumption
of the previous three financial years of the expansion/ diversification project as
certified by Chartered Accountant or 75% of the highest power consumed in the last
3 years by the original unit, whichever is higher. Power consumed over and above
the base consumption will be eligible for reimbursement of power cost. If the
electronics industry has taken up expansion/diversification in the same year, the base
power consumption will be calculated proportionately.
5.3.8. In case the electronics enterprise purchases second-hand land and building along
with power either on lease or outright sale, the unit will not be entitled for any power
cost reimbursement if the power connection is in the name of the original
industry/enterprise. However, if the original industry/ enterprise transfers the power
connection in the name of the electronics enterprise / approved project, they are
entitled for power cost reimbursement provided they install new plant and machinery.
5.3.9. Power for approved projects in Zone B will be provided at a subsidized rate of INR
Page 16 of 79
4.50 per unit and will not be eligible for reimbursement of power cost.
5.3.10. Enterprises applying for this incentive shall be required to submit documentation in
Annexure-A for verification of incentive claim, in addition to the application form.
S.
No.
Enterprise
Zones
% of
reimbursement
Maximum Limit
1
Electronics industry
Zone A
Not applicable
Not Applicable
2
Electronics industry
Zone B
5% on term loan for
5 years
INR 1,50,00,000
per annum
5.4.1. To be eligible for this incentive, the approved project should complete at least 1 (one)
year of commercial production from the DCP.
5.4.2. Eligible electronics enterprises shall submit their claims in the prescribed application
form given at FORM (5) within 6 months from attaining eligibility and for subsequent
claims before 30th September of the following financial year to APEITA.
5.4.3. This incentive is applicable for new and expansion/ diversification projects subject to
fulfillment of all other the conditions stipulated.
5.4.4. The new/ expansion/ diversification approved projects of electronics industry availing
term loan from Scheduled Commercial Banks / Financial Institutions/ Cooperative
Banks/ RRB recognized by Reserve Bank of India, Andhra Pradesh State Financial
Corporation (APSFC) and Small Industries Development Bank of India (SIDBI) only
are eligible under this scheme.
5.4.5. For the purpose of interest subsidy, the rate of interest charged will be taken as the
applicable rate of interest.
5.4.6. This reimbursement to the electronics enterprise shall not include penal interest,
liquidated damages etc. paid to the financial institutions/ banks.
5.4.7. The interest reimbursement will be made in proportion to the interest paid against the
total interest to be paid in the given financial year.
5.4.8. The loan accounts that are classified as overdue in the books of the bank or Non-
performing Assets at year-end are ineligible. However, if they resume on-time
repayments and regularize the arrears, they are eligible for the incentives in the next
financial year. For this purpose, the banker has to certify that the repayment is
regular, and the account is standard and the same is to be enclosed along with claim
application. In case the accounts are regularized, the units will be given this benefit
for the period for which the accounts are regularized along with the regular claim
excluding penal interest.
5.4.9. The total rate of interest reimbursed by the GoAP and the Central Government under
interest subvention or the Technology Upgradation Fund (TUF). shall not exceed the
rate of interest imposed by the financial institution.
5.4.10. Enterprises applying for this incentive shall be required to submit documentation in
Annexure-A for verification of incentive claims, in addition to the application form.
5.4. Reimbursement of Interest subsidy
Page 17 of 79
S. No.
Enterprise
Zones
% of reimbursement
Maximum Limit
1
Electronics
enterprise
Zone A
100% net SGST for 8
years
Overall incentive
capped at 50% of FCI
2
Electronics
enterprise
Zone B
100% net SGST for 8
years
Overall incentive
capped at 100% of
FCI
5.5.1. To be eligible for this incentive, the approved project should complete at least 1 (one)
year of commercial production from the DCP.
5.5.2. Eligible electronics enterprises shall submit their claims in the prescribed application
form given at FORM (6) within 6 months from attaining eligibility and for subsequent
claims before 30th September of the following financial year to APEITA.
5.5.3. Net SGST accrued to the State: Net SGST means SGST amount paid through cash
ledger against the output liability of SGST on sale of eligible products. The eligible unit
shall first have to utilize all the eligible Input tax credit (ITC) available in its Credit
Ledger, including eligible ITC of IGST as provided under the CGST Act, 2017 as may
be amended from time to time, before adjusting the SGST amount through Cash
Ledger.
5.5.4. Only the products where the end consumption happens in the state of Andhra Pradesh
shall be eligible for this incentive. Further, the liability to prove such end consumption
within the state shall rest with the applicant.
5.5.5. The net SGST accrued to the state for a period of 8 years from the DCP or up to
realization of 50% FCI for projects in Zone A or 100% FCI for projects in Zone B as
the case may be, whichever is earlier, shall be reimbursed.
5.5.6. The expansion/ diversification projects will be allowed for reimbursement on State
SGST paid on production made over and above the base annual production capacity
of the original enterprise i.e., before expansion/ diversification. The base annual
production is either the average annual production of previous three financial years
or 75% of installed capacity of the original Industrial Enterprise, whichever is higher
in the case of manufacturing single product (as certified by Financial Institution/
Chartered Accountant). If the enterprise/ industry takes up expansion/diversification
in the same year, the base capacity will be calculated proportionately. In case of multi
products, the average annual sales turnover of previous three financial years will be
taken as base turnover (as certified by Chartered Accountant).
5.5.7. The enterprise shall obtain the details of the net SGST accrued to the state, paid during
the year for which the claim is being made duly certified by State Commercial Tax
authorities for original/expansion/diversification enterprise separately as the case may
be.
5.5.8. Eligible unit shall have to obtain a separate registration under GST Act for
manufacturing of eligible products only. The eligible unit shall not carry out any trading
activity or provision of any services not relating to eligible products from its
5.5. SGST reimbursement
Page 18 of 79
place of business. The eligible unit shall have to obtain a separate registration, if the
unit carries out trading activity or provision of any services not relating to eligible
products. Incentives shall be allowed only for eligible goods manufactured in the
eligible unit and not on the resale of goods.
5.5.9. If the eligible unit has shown its inter-state sales as intra-state sales through
intermediary/ marketing network/ or any other middle man, either directly or indirectly
controlled by it, in order to get higher incentives then the eligibility of the unit shall be
liable to be cancelled with effect from the date of such contravention, and the eligible
unit shall be liable to return forthwith the incentives availed together with interest at
the rate of eighteen percent per annum.
5.5.10. Enterprises applying for this incentive shall be required to submit documentation in
Annexure-A for verification of incentive claim, in addition to the application form.
S.
No.
Enterprise
Zones
% of reimbursement
Maximum Limit
1
Electronics enterprise
Zone A
Not Applicable
Not Applicable
2
Electronics enterprise
(for domestic transport cost)
Zone B
25% of cost incurred
on domestic transport
up to INR 50 lakh per
annum for 5 years
INR 50 Lakh per
annum
3
Electronics enterprise
(global firms relocating their
existing plants to India –
cost incurred on import of
manufacturing equipment)
Zone B
50% of cost incurred
on import of
manufacturing
equipment up to INR 2
Cr.
One-time
incentive capped
at INR 2 Cr.
Domestic Transport Cost:
5.6.1. To be eligible for this incentive, the approved project should complete at least 1 (one)
year of commercial production from the DCP.
5.6.2. Eligible enterprise shall submit their claims in the prescribed application form given at
FORM (7) within 6 months from attaining eligibility and for subsequent claims before
30th September of the following financial year to APEITA.
5.6.3. For the purpose of this incentive, transport cost includes costs incurred in
transportation of inputs, raw material, and finished goods to and from the approved
project location such as freight cost, carrier cost, fuel cost, third party logistics vendor
cost, taxes, and statutory charges/ fees.
5.6.4. The reimbursement shall not include penalties, interest, fines, and late dues incurred
as part of transport of goods. It shall not include cost of transportation of employees.
While calculating the transport cost, any transport cost capitalized shall be removed.
5.6. Reimbursement of Logistics Cost
Page 19 of 79
5.6.5. Enterprises applying for this incentive shall be required to submit documentation in
Annexure-A for verification of incentive claim, in addition to the application form.
Cost incurred on import of manufacturing equipment on relocation:
5.6.6. To be eligible for this incentive, the approved project should complete at least 1(one)
year of commercial production from the DCP.
5.6.7. To be eligible to claim logistics cost incurred on import of manufacturing equipment,
the electronics enterprise must specify the details in the DPR / business proposal
submitted for approval to CCITEI. This incentive is eligible for units relocating their
operations from other nations into Andhra Pradesh, provided:
5.6.8. The logistics cost eligible shall be lower of actual cost claimed and cost of freight as
calculated by deducting Free on Board (FOB) value and Insurance Cost from Cost
Insurance Freight (CIF) value of imported plant and equipment.
5.6.9. The reimbursement will not include penalties, interest, fines, and late dues incurred
as part of transport of goods. It shall not include cost of transportation of employees.
While calculating the transport cost, any transport cost capitalized shall be removed.
5.6.10. Eligible electronics enterprise shall submit their claims in the prescribed application
form given at FORM (7) for reimbursement of logistics cost on import of manufacturing
plant and equipment within six months from attaining eligibility.
5.6.11. The logistics cost incurred from the date of handing over of land/shed up to 6 months
from the date of commercial production / operation of approved project may be
permissible.
5.6.12. Enterprises applying for this incentive shall be required to submit documentation in
Annexure-A for verification of incentive claim, in addition to the application form.
S.
No.
Enterprise
Zones
% of reimbursement
Maximum Limit
1
Electronics
enterprise
Zone A
Not applicable
Not applicable
2
Electronics
enterprise
Zone B
Up to 5% on annual
incremental sales (over
base year)
Overall incentive
capped at 100% of
FCI
5.7.1. To be eligible for the incentive, the enterprise should have completed at least 1
(one) year of commercial production from DCP.
5.7.2. The project approval shall be accorded by CCITEI based on the merit of the DPR
submitted.
5.7.3. To be eligible for project approval under the scheme, the enterprise should commit
to invest at least INR 100 Cr. as FCI or generate at least 1,000 employment after the
date of notification of the policy.
5.7.4. The company would be eligible to apply for this incentive from the year in which it
attains a realized investment of INR 100 Cr. or realized employment of 1,000.
5.7. Production Linked Incentive (PLI) Scheme
Page 20 of 79
5.7.5. The eligible incentive shall be calculated as a percentage of annual incremental sales
over base year, from the approved plant in Andhra Pradesh. Only the revenue from
sales shall be considered for computing the incentive. Further, other income such as
interest income, revenue from sale of assets etc. shall not be considered.
5.7.6. Base year for the purpose of the policy shall be the financial year 2021-22.
5.7.7. The incentive rate listed in table below is applicable to the specific financial year
irrespective of the number of years since DCP.
Year Wise Rate of Incentive
Year
Incentive Rate
2022-23
5%
2023-24
5%
2024-25
4%
2025-26
4%
2026-27
3%
2027-28
3%
2028-29
2%
2029-30
2%
2030-31
1%
2031-32
1%
5.7.8. The annual sales eligible for calculation of incentive shall refer to the sale value of
goods manufactured by the electronics enterprise in the approved project within the
specific approved location only, for the given financial year.
5.7.9. The eligible enterprise/ industry should submit incentive claim in prescribed application
FORM (8) within 6 months after completion of 1 (one) year of commercial production
for the first claim and by 31st December of the following financial year for subsequent
claims to APEITA.
5.7.10. Enterprises applying for this incentive shall be required to submit documentation in
Annexure-A for verification of incentive claim, in addition to the application form.
5.7.11. In case enterprise has multiple factories in multiple locations within the state, separate
book of accounts shall be maintained for each factory.
Page 21 of 79
6.1. Land/ shed allotment and other related matters such as cost, mode of allotment, to the
Electronics enterprise shall be as per the norms prescribed by the land allotment
agency from time to time.
6.2. The extent of land/ shed to be allotted to an industrial enterprise shall be determined
by CCITEI based on the recommendation of APEITA. For this purpose, APEITA shall
hire an expert 3rd party agency or industry experts through a competitive bidding
process or empanelment.
6.3. The Electronics enterprise must ensure commencement of operations within 3 years
from the date of handing over of land and 1 year from the date of handing over of shed.
Extension of Timeline (EOT) requests from the industrial enterprises shall be as per
the land allotment agency.
6.4. The following timelines are applicable in case of Electronics enterprises, from the date
of handing over of land/ shed, to claim incentives:
a) Commence operations within 3 years for land and within 1 year for shed
b) Employment and investment fulfillment as per the milestones proposed in the
approved DPR
6.5. In case the unit/ enterprise fails to commence operations as outlined in Para 6.4 of this
document, from the date of handing over of land, such units may be served a legal
notice by the respective competent authority based on the recommendation of
APEITA. The course of action on the legal notice shall be examined and placed before
CCITEI by APEITA.
6.6. In case the unit/ enterprise fails to meet the stipulated milestones in terms of
employment generation, such units may be served a legal notice by APEITA. The
course of action on the legal notice shall be examined and placed before CCITEI by
APEITA.
6.7. Mixed purpose land usage is allowed up to 25 percent of the total land allotted towards
employee housing, and recreation.
6.8. The remaining land shall be utilized only for the core activities pertaining to the
Electronics industry.
Companies intending to establish Mega Projects/ strategically important investments which
will expedite the development of the Electronics manufacturing ecosystem in the State and
contribute to the overall socio economic development in the State and are desirous of seeking
financial assistance/ concessions must present detailed DPR along with project reports to
APEITA, duly mentioning the special incentives being sought for with due justification. On
receipt of such proposals, APEITA will examine the same with due diligence and forward it to
the Government through CCITEI following due procedure defined for placing it before the
State Investment Promotion Committee (SIPC) and the State Investment Promotion Board
(SIPB) for taking the necessary decisions.
6. LAND/ SHED ALLOTMENT FOR ELECTRONICS INDUSTRY
7. CUSTOMIZED INCENTIVE PACKAGE
Page 22 of 79
8.1.1. Cost of land shall be considered towards computation of eligible FCI.
8.1.2. In case of land allotment by the land allotment agency, the value of the land shall
be taken as the land allotment rate approved for the industrial enterprise.
8.1.3. In case of land procured from a legal public/ private entity, the value of land shall
be taken as the registration value in the sale deed.
8.2.1. The value of the factory building constructions will be limited to the approved
project cost. Values of leased building will not be considered. Cost of buildings
will be computed as per the Andhra Pradesh State Financial Corporation (APSFC)
approved rates of construction/ year of construction or the actual cost, whichever
is lower. The items of civil works which are permitted for computation towards
eligible cost are:
a. Main factory shed
b. Raw Material and finished products godowns
c. Office room and lab room
d. Clean rooms for manufacturing
e. Cooling water ponds
f.
Boiler shed and generator room
g. Effluent treatment plants/ pond
h. Overhead tank, bore-wells, pump house and sump
i.
Fencing and gate
j.
Architect fee and supervision charges
k. Compound wall
l.
Canteen
m. Workers’ rest room
n. Cycle/ vehicle Stand
o. Security shed and
p. Toilet room and sanitary fittings
8.2.2. The total value of items at (j) to (p) and similar items shall not exceed 10% of the
total value of civil works. Total value of the civil works means items (a) to (i) only
(within the approved project cost). The plinth area of the civil works is based on
the construction made by the enterprise/ industry from items (a) to (i) only.
8.2.3. In case the firm leases a facility and makes new additions to the facility, the same
shall be considered as part of project cost with the approval of CCITEI. The items
of civil works which are permitted for computation towards eligible cost are:
a. Raw Material and finished products godowns
b. Office room and lab room
c. Clean rooms for manufacturing
d. Canteen
e. Workers’ rest room
8.1. Land
8. COMPUTATION OF FIXED CAPITAL INVESTMENT
8.2. Factory Building
Page 23 of 79
f.
Toilet room and sanitary fittings
The total value of items from (d) to (f) and similar items shall not exceed 10% of
the total value of civil works. Total value of civil works means items (a) to (c) only
(within the approved project cost).
8.3.1. Value of the plant, machinery and equipment installed and the value of tools (other
than consumables), Jigs, Dies, Molds, pollution control equipment, and lab
equipment necessary for production of approved line of activities will be
considered, as per the notification under the Micro, Small, and Medium Enterprises
Development (MSMED) Act, 2006 of GoI from time to time. Leased plant and
equipment are not eligible for incentives.
8.3.2. In case of unit setup with imported machinery, value of 100% imported second-
hand plant, machinery and equipment will be considered as new indigenous
machinery if it is imported directly by the unit. In case of indigenous secondhand
machinery purchased by the enterprise, such value should not exceed 25% of
the total value of plant and machinery. The value of indigenous second-hand
machinery will not be computed towards eligible Capex for incentives. To decide
the percentage of second-hand machinery, market value as certified by Chartered
Accounted will be considered, subject to such machinery having a minimum of
twelve (12) years life and to be certified by a Professional Engineer. The above
norms are in case the project is being set up with a mix up of new/ second-hand
machinery. However, the projects setup with total second-hand machinery would
not be eligible for any incentives/ concessions.
8.3.3. Expenditure on Technical Consultancy/ Feasibility study including turn-key
charges will be considered towards the Capex, provided they are part of the
approved project cost, capitalized and certified by a Chartered Accountant, but
limited to 10% of the total cost of plant machinery and equipment installed.
8.3.4. Value of self-fabricated machinery by the unit will have to be certified by a
Chartered Engineer or Engineer of the term lending institution concerned for the
purpose of computing the eligible Capex.
8.4.1. Working capital, raw material, stores and all consumables including spare tools
8.4.2. Value of motor vehicles.
8.4.3. Pre-operative expenses, advances, expenditure not supported by payment of
bills.
8.4.4. Investment made outside the approved project cost and items not covered by
approved project.
8.4.5. Diesel generators.
8.3. Plant and Machinery:
8.4. Items not computable towards fixed capital investment:
Page 24 of 79
8.4.6. Transformers.
9.1.
The claim applications filed after six months but before one year from the date of eligibility
of the claim, after commencement of operations, will be treated as belated claims and are
eligible for 50% of the eligible incentives.
9.2.
All eligible MSMEs should furnish a registered lease deed for a minimum six (6) years
operations period from the DCP and Large & Mega enterprises should furnish a registered
lease deed for a minimum eight (8) years operations period from the DCP.
9.3.
Existing enterprise setting up a new enterprise with separate identifiable investment within
the same land of the existing unit with a wall separating the two units is considered as a
separate project. The words 'SEPARATE IDENTIFIABLE INVESTMENT’ shall mean that
the enterprise should not have any production linkage with the existing manufacturing
process such as using common loading system for unloading raw materials and
transporting finished products the new Enterprise/Industry should be in a separate
building/ shed, should maintain separate books of accounts and the project should be
appraised independently by financial institution. In case of self-financed units, Approved
Project Cost will need to be certified by Chartered Accountant / Chartered Engineer, and the
cost of the individual elements should be validated by the latest audited financial statements
of the firm. A new project will not, however, be regarded as a "Separate Identifiable
Investment" if the utilities of the existing enterprise like electricity without separate main
meter (no sub-meter) are extended to the new enterprise. Sale bills shall be maintained in
the name of (unit I and unit II) and the same should be reflected in the annual financial
statements separately. For this case where utilities are extended to the new enterprise, in
case of any doubt/ambiguity in deciding the “"Separate Identifiable Investment" the
decision of CCITEI is final.
9.4.
If any existing enterprise setting up a new enterprise with Separate Identifiable Investment
for the same end product/ new product at different location in the same name it will be
treated as a new enterprise (Separate Identifiable Investment) for the purpose of sanction
of various incentives, even though there is no separate GST registration number and
separate marketability, since the Commercial Tax Department is issuing only one GST
Registration number for one dealer even though they have more than one enterprise within
the State. However, they must maintain separate books of accounts for each location.
9.5.
For Expansion/ diversification, the enterprise should also obtain all the statutory/required
approvals.
9.6.
The entrepreneurs should have Permanent Account Number (PAN) and should file the
Income Tax Returns annually in the name of the legal entity i.e. proprietor in the case of
sole proprietorship, firm in case of partnership and in the name of the company in case
of Private Limited companies etc.
9. GENERAL GUIDELINES
Page 25 of 79
10.1. New enterprise established with plant and machinery on lease is not eligible for
incentives/concessions.
10.2. New enterprise established with second hand machinery is not eligible for incentives/
concessions except where the cost of such machinery does not exceed 25% of the total
cost of plant and machinery.
10.3. Composite enterprise set up for manufacture of an eligible item along with an ineligible
item are not eligible for incentives/ concessions except when the proportion of ineligible
items in the total production is less than 10% in value of the total turnover.
11.1. For any change of constitution/ management/ name or style or sale of the enterprise within
the first 6 years from DCP in case of MSMEs and 8 years from the DCP in case of Large
& Mega enterprises, the project proponent shall obtain approval of CCITEI duly producing
No Objection Certificate (NOC) from the financing institutions concerned in respect of
aided Enterprise and Certificate of Incorporation (COI) from Registrar of Companies
(ROC). In case of self-financed unit, the certificate from a certified Chartered Accountant
shall be furnished.
11.2. Whenever inspecting officer of APEITA finds the unit sick, closed, or a change in
management, change of financing institution, shifting part of the machinery/ equipment
etc. or for any other reason not worthy of receiving subsidy till further examination, ITE&C
Department shall not disburse the subsidy to such enterprise/ industry and a written
intimation shall be given to the enterprise by the ITE&C department. In the above
situations, the subsidy shall be disbursed only after further clearance given by the CCITEI.
In case the unit/ enterprise has availed incentives/ concessions and whose management is
not able to run the enterprise/ industry and intends to lease to other management within the
first six (6) years from DCP in case of MSMEs and eight (8) years from the DCP in case of
Large & Mega enterprises, they should obtain the (NOC) from the financing institutions
concerned in respect of aided Enterprise/ Industry before seeking the approval of CCITEI
through APEITA. The ITE&C Department, if necessary, may refer the case to APIIC for
necessary action as per rules in force at that time.
10.
INELIGIBILITY
11. CHANGE OF CONSTITUTION/ MANAGEMENT/ NAME OR STYLE OF
INDUSTRIAL ENTERPRISE/ INDUSTRY
12.
LEASE OF ENTERPRISE/ INDUSTRY:
Page 26 of 79
13.1. Any Electronics unit/ enterprise proposing to shift their enterprises within or outside the
district should obtain NOC from the financing institutions concerned in respect of aided
enterprises before seeking the approval of CCITEI.
13.2. In respect of self-financed enterprises proposing to shift their Enterprises within or outside
the District, they should obtain prior approval of CCITEI.
13.3. Shifting of enterprise/ industry outside the State is not allowed.
14.1. Prior approval of the CCITEI is necessary for any merger/ amalgamation of enterprise/
industry. The Public and Private Limited Companies seeking merger/ amalgamation of their
group of companies shall apply to APEITA along with the necessary orders of appropriate
forum under The Companies Act, 1956 and its subsequent amendments till date, NOC from
the Financing Institution, amended LI/ Industrial License (IL)/ Industrial Entrepreneurs
Memorandum (IEM) and Incorporation Certificate from the Registrar of Companies (RoC).
14.2. Partnership Firms shall submit NOC from their financing institution and Firm Registration.
The proprietors concerned shall submit NOC from the financing institution.
If an enterprise/ starts manufacturing new eligible items without any additional machinery or
equipment, with the same plant and machinery, then such items shall be permitted for availing
incentives within five (5) years from the DCP for the original product. They should obtain prior
approval from CCITEI.
The Electronics enterprise obtaining incentives should be in continuous operation for a period
of six (6) years in respect of MSMEs and eight (8) years in respect of Large & Mega
enterprises from the DCP failing which all incentives/ concessions sanctioned are liable to
be cancelled and the incentives/ concessions already availed are liable for recovery. In this
regard, APEITA should monitor the progress of these enterprises and submit report to the
ITE&C dept. on a half yearly basis. Break-in-operation up to a period of three (3) years due to
the reasons beyond its control such as shortage of raw-materials, power and change of
management, etc. may be considered by CCITEI on merits. Any break-in-operation will result
in extending the continuous operation period requirement, by the period of such break.
13. CHANGE OF LOCATION OF INDUSTRIAL ENTERPRISES SANCTIONED
INCENTIVES/ CONCESSIONS:
14. MERGER/ AMALGAMATION OF INDUSTRIAL ENTERPRISE
15. CHANGE OF LINE OF ACTIVITY/INCLUSION OF ADDITIONAL LINE OF
ACTIVITIES
16. BREAK IN PRODUCTION
Page 27 of 79
17.1. Sanction procedure: All claims for incentives shall be made on the online incentive portal/
application form within the stipulated time frame to APEITA, which will then verify the
applications and place before the CCITEI for approval.
17.2. Inspection Procedure: APEITA may utilize the services of an internal committee or expert
3rd party agency or the concerned inspecting officers of APEITA shall physically inspect for
the processing of incentive applications before placing the incentive claims in CCITEI. The
reports shall be obtained from the unit during the inspection in a prescribed format. The
claims received further shall be processed based on the reports of physical inspection and
reports. These reports shall also be utilized for analyzing the efficiency/ performance of the
unit.
17.3. APEITA shall process incentive applications within 60 days from date of receipt of the claim.
18.1. Incentives/concessions granted to an enterprise shall be liable to be recovered under the
following circumstances:
1.
If the incentives/ concessions are obtained by the enterprise/ industry by
misrepresentation of essential facts or by furnishing of false information or
suppressions of facts or by submission of false/fake documents etc. In addition to
recovery of the incentives granted, penalty will be levied as deemed fit on the
disbursed amount and the unit shall be barred from availing incentives in future.
2.
If the enterprise goes out of operation within six (6)/ eight (8) years from the DCP,
as applicable: However, in the case where the unit remains out of operation for a
period up to 36 months due to the reasons beyond its control such as shortage of
critical infrastructure, power and change of management, bills receivables,
recession in the market, fire accidents and natural calamities etc., and the same is
regularized by the CCITEI, then the enterprise is exempted from recovery/ penalty.
3.
If the unit fails to furnish the prescribed statements and/ or information when it is
called upon to furnish.
4.
If the unit effects change of management without prior approval from the financing
institution concerned and the CCITEI.
5.
If the unit shifts a part or whole of the enterprise/ industry after receiving a part or
whole of the incentives without prior approval of the CCITEI.
6.
If the whole or part of the unit is leased/ sold to another industrial unit/ enterprise
without the prior approval of the CCITEI.
7.
If the unit enters into a contract of any nature whatsoever by transferring the
Management, without the prior approval of the CCITEI.
17.
PROCEDURE FOR SANCTION OF INCENTIVES
18.
RECOVERIES OF INCENTIVES SANCTIONED UNDER THE SCHEMES
Page 28 of 79
18.2. In the event of recoveries for reasons arising mentioned above, they shall be recovered
treating them as arrears of Land Revenue under A.P. Revenue Recovery Act, 1864 and the
APEITA officers will be designated as recovery officers by suitable Government Orders.
18.3. In this regard, APEITA should monitor the progress of the unit and submit report to the ITE&C
Department every six months.
The unit availing incentives for this project, shall furnish certified copy of audited accounts
including balance sheet before 30th September of the succeeding year to APEITA through
online system. Such statement should be furnished for a period of minimum six (6)/ eight (8)
years as applicable, as per the case. Further, the unit should also furnish details of operations,
sales, employment, etc., through online system before 30th September of the succeeding year.
In case the unit fails to submit the certified audited accounts including balance sheet or Annual
Performance Report in time, the recurring incentives in future will not be disbursed.
The CCITEI has been constituted vide G.O Ms. No. 4 Dated 01.04.2021 and comprises of
the following members.
S.
NO.
ORGANIZATION/
DEPARTMENT
DESIGNATION
AFFILIATION
1
IT,E&C Dept.
Principal Secretary
Chairman
2
IT,E&C Dept.
Special Secretary
Member
3
AP TRANSCO
CMD or representative
Member
4
APEPDCL/APSPDCL Managing Director or representative
Member
5
Stamps &
Registration
Commissioner & IG Registration or
representative
Member
6
APIIC
VC & MD or representative
Member
7
Labour Dept.
Representative of Commissioner
Member
8
MA&UD Dept.
Representative of Commissioner
Member
9
Industries Dept.
Representative of Commissioner
Member
10
STPI
Director, Andhra Pradesh or
representative
Member
11
VSEZ
Development Commissioner or
representative
Member
12
IT,E&C Dept.
IT Advisor to the Govt.
Member
13
IT,E&C Dept.
IT Advisor to the Govt.
Member
14
APEITA
Group CEO
Member
15
APTS
Managing Director or representative
Member
19. FURNISHING OF STATEMENT OF ACCOUNT/INFORMATION BY ELIGIBLE
ENTERPRISES/ INDUSTRIES
20. CONSTITUTION OF CCITEI
Page 29 of 79
S.
NO.
ORGANIZATION/
DEPARTMENT
DESIGNATION
AFFILIATION
16
IT,E&C Dept.
Director Promotions
Member
17
IT,E&C Dept.
Joint Director Promotions
Convener
The ITE&C department has constituted the Consultative Committee for Information
Technology and Electronics Investments (CCITEI). The CCITEI shall act as a single window
for granting all the incentives, land allotments etc. The terms of reference of CCITEI are
indicated below:
a) To grant various incentives, land allotments available in the AP IT Policy, AP Electronics
Policy and any other polices to be issued within the said period, to industry on examination
of applications made by them including recommending allotment of lands to the IT & ESDM
Industry in the respective IT/ESDM parks/clusters.
b) To resolve the problems in implementation of the policies and cause necessary through
implementing
agencies,
such
as
APIIC/Urban
Development
Authorities/DISCOMs/Municipal Corporations, for administration of various incentives
sanctioned, and for speedy realization of the goals set forth in the upcoming polices within
the said period.
c) To prescribe the procedures and to issue guidelines and clarifications in implementation
of all polices to be issued in coming years i.e., 2020-2025. The CCITEI can
recommend/approve/reject/defer any application for incentives/land allotments at its sole
discretion.
d) Committee shall process the old incentive applications as per the earlier policies until new
policies and guidelines are issued.
When any matter arises for the purpose of interpretation on which CCITEI could not take a
decision or in case where any suggestions are made outside the scope of CCITEI in regard
to implementation of the scheme, such matters shall be referred to the Government of Andhra
Pradesh for decision.
Without prejudice to anything included in this paragraph, it is hereby ordained that any willful
misrepresentation of facts, action/ inaction on behalf of entrepreneur leading to irregular
sanction/disbursement of incentives under the above policy will invite civil and criminal
21. POWERS OF CCITEI
22. INTERPRETATION
23. PENALTIES
Page 30 of 79
action as per extant laws besides recovery of the amount irregularly disbursed, if any, and
debarring the unit from claiming incentives in the future.
Page 31 of 79
List of Mandatory Documents for Claim of Incentives
S. No.
Incentive
Type
Documents Required
1
Investment
subsidy
i. Annual audited financial statements of the project
ii. Purchase/ EPC 2 agreements and original invoices
iii. Valuation of eligible project costs by certified Chartered Engineer
and Chartered Accountant
iv. Project cost valuation by financial institutions funding the project
v. All statutory approvals/ Consent for Operations
vi. Professional tax/ EPF proof
vii. Bank certificate for proof of salary disbursement
viii. 3rd party/ internal committee verification report for proof of
employment and existence of plant and machinery
ix. Caste/ Community Certificates of all promoters for SC/ ST/ BC
enterprises
2
Stamp duty,
transfer
duty,
registration
i. Land sale deed/ agreement
ii. Land registration documents
iii. Professional tax/ EPF proof
iv. Bank certificate for proof of salary disbursement
v. 3rd party/ internal committee verification report for proof of
employment
vi. Valuation of eligible project costs by certified Chartered
Engineer and Chartered Accountant
vii. Project cost valuation by financial institutions funding the project
viii. All statutory approvals/ Consent for operations
3
Reimbursem
ent of power
cost
i. Original power invoice from DISCOM for each month of the
claim year
ii. Proof of payment of power bills to DISCOM (bank statement/
payment receipts)
iii. Professional tax/ EPF proof
iv. 3rd party/ internal committee verification report for proof of
employment
v. Project cost valuation by financial institutions funding the project
vi. All statutory approvals/ Consent for operations
vii. Caste / Community Certificates of all promoters for SC / ST / BC
/ Women enterprises
4
Interest
i. Loan agreement
ANNEXURE – A
Page 32 of 79
S. No.
Incentive
Type
Documents Required
subsidy
ii. Bank certified loan account statement
iii. Annual audited financial statements for the project
iv. Professional tax/ EPF proof
v. 3rd party/ internal committee verification report for proof of
employment
vi. Valuation of eligible project costs by certified Chartered
Engineer and Chartered Accountant
vii. Project cost valuation by financial institutions funding the project
viii. All statutory approvals/ Consent for operations
5
SGST
reimbursem
ent
i. Form – A from the concerned Commercial Tax Officer (CTO).
ii. GSTR-3B and GSTR-2A (as amended by the Government of
India from time to time) for reimbursement of Net SGST.
iii. Audited annual financial statements for the project
iv. 3rd party/ internal committee verification report for proof of
employment
v. Valuation of eligible project costs by certified Chartered Engineer
and Chartered Accountant
vi. Project cost valuation by financial institutions funding the project
vii. All statutory approvals/Consent for operations
viii. Net SGST accrued to the state and being claimed by the
company, certified by the Revenue (Commercial Tax) department
6
Logistics
cost on
domestic
transport
i. Annual audited financial statements
ii. GST/ tax returns
iii. e-Way bills
iv. Original logistics invoices along with proof of payment of such
bills (bank statement/ payment receipt)
v. All statutory approvals/ Consent for operations
vi. Professional tax/ EPF proof
vii. 3rd party/ internal committee verification report for proof of
employment
7
Logistics
cost on
import of
equipment
i. Annual audited financial statements
ii. e-Way bills
iii. Purchase Order, invoice and goods receipt note for equipment
purchase
iv. Customs/ duty clearance receipts for imported equipment
v. Valuation of imported equipment certified by a Chartered
Engineer/ customs
vi. Original logistics invoices along with proof of payment of such
bills (bank statement/ payment receipt)
vii. All statutory approvals/ Consent for operations
viii. Professional tax/ EPF proof
Page 33 of 79
S. No.
Incentive
Type
Documents Required
ix. 3rd party/ internal committee verification report for proof of
employment
8
Production
Linked
Incentive
(PLI)
scheme
i. Annual audited financial statements of the project for base year
and claim year
ii. GST returns for base year and claim year
iii. All statutory approvals/ Consent for operations
iv. Professional tax/ EPF proof
v. DPR submitted to ITE&C Department
vi. 3rd party/ internal committee verification report for proof of
employment
Page 34 of 79
List of Eligible Activities Under the Andhra Pradesh Electronics Policy 2021-24
S.
No.
Description of Goods
Assembly/ Sub-assembly
1
Mobile phones, Consumer electronics such as washing machines, TVs, refrigerators,
laptops, printers, desktop computers, set-top boxes, ACs, water heaters/geysers,
Audio equipment, Game consoles, other consumer
electronics etc.
2
Manufacturing of LED bulbs, tube lights etc.
Electronics Components
1
Surface-mount Technology (SMT) components including LED Chips
2
Chip Modules for Smart Cards, Radio-frequency identification (RFID) Antenna &
Labels, Chip-on-Board (CoB) / System in Package
3
Passive components including resistors, capacitors, ferrites, etc. for electronic
applications
4
Electromechanical components including transformers, inductors, coils, relays,
switches, micro motors, stepper motors, Brushless Direct Current (BLDC) Motors,
Connectors, Heat Sinks, Antenna, Speakers, Microphones, etc. for
electronic applications
5
Magnetrons, Wave guides, Circulators, Couplers, Isolators, Filters, Magnets,
Radio Frequency (RF) Components for electronic applications
6
Printed Circuit Boards (PCBs), PCB Laminates, Prepegs, Photopolymer films,
PCB Printing Inks; Printed Flexible Electronics
7
Sensors, Transducers, Actuators and Crystals for electronic applications
8
Camera Modules, Vibrator motor/ ringer
9
Universal Serial Bus (USB) /Data Cables, High Definition Multimedia Interface
(HDMI) Cables
10
Display fabrication units including Liquid Crystal Displays (LCD), Light Emitting
Diode (LED), Organic Light Emitting Diode (OLED), etc. for electronic
applications
11
Active Components:
a. Discrete semiconductor devices including transistors, diodes, etc.
b. Power semiconductors including Field Effect Transistors (FETs), Metal-
oxide semiconductor FET (MOSFETs), Thyristors, etc.
12
Preform of Silica and Optical Fiber
13
Micro/Nano-electronic components such as Micro Electromechanical
Systems (MEMS) and Nano Electromechanical Systems (NEMS)
14
Assembly, Testing, Marking and Packaging (ATMP) units
15
Mechanics (plastic and metal parts) for electronic applications. This includes
plastic molding required by any products listed in this annexure
16
Compound Semiconductors such as Gallium nitride (GaN), Silicon carbide
(SiC), Gallium Arsenide (GaAs), etc. and Silicon Photonics devices, Solar
photovoltaic
cells,
solar
modules
and
panels,
Integrated
Circuits,
ANNEXURE – B
Page 35 of 79
S.
No.
Description of Goods
Optoelectronic components
17
Semiconductor Wafers
18
Semiconductor
Integrated Chips (ICs)
including
Logic
[Microprocessor,
Microcontrollers, Digital
Signal
Processors
(DSP),
Application
Specific
Integrated Circuits (ASICs), etc.; Memory; Analog/ Mixed Signal ICs, etc.
19
Li-ion
and
Advance
Chemistry
Cell
(ACC)
Batteries
(as
defined
by
Government of India from time to time) and associated components used in
manufacturing of batteries
20
Electronic toys, Robots (medical, industrial etc.) and its components.
21
Telecom, Networking equipment and IoT devices
22
Medical electronics goods and components as defined by Government of
India from time to time
23
Automotive electronics and e-mobility and its components
24
Defense and aerospace electronics including drones
25
Capital goods for all the goods covered under SPECS 1 scheme of Government
of India
26
Set-top boxes, IoT (Internet of thing) devices, sensors
27
e-waste processing
28
Any other activity notified under MSIPS, PLI2, SPECS of Government of India
29
Any other activity not listed in the above can be included within the purview of
this policy after securing approval from CCITEI
1.
1 Scheme for Promotion of Manufacturing of Electronics Components and Semiconductors (SPECS),
Government of India
2 Production Linked Incentive (PLI) Scheme for Electronics sector, Government of India
Page 36 of 79
FORM - 1
COMMON APPLICATION FORM (CAF) FOR REGISTRATION AND
SANCTION OF INCENTIVES
1. Personal Details
1.1 Promoter's/ Managing Director's Name
Mr./ Ms. / Mrs.
1.2 Father's/Husband's Name
C/O/ W/O S/O
D/O
1.3 Aadhaar Number
1.4 Mobile Number
2. Office Address
3. Enterprise Name
3.1 Name of the Enterprise
3.2 Type of Enterprise
3.3 Nature of Enterprise
3.4 Category of Enterprise
(General / SC / ST / BC / Women / MSE)
3.5 PAN
3.6 GST No
3.7 GST Certificate
4. Enterprise Location Details
FORM 1- COMMON APPLICATION FORM (CAF) FOR REGISTRATION AND
SANCTION OF INCENTIVES
2.1 Plot/ Survey No.
2.2 City/ Town
2.3 State
2.4 Pin Code
2.5 Fax
2.6 Street/ Village Name
2.7 Country
2.8 District
2.9 Email ID
2.10 Telephone
Number (Including STD
and ISD Code)
Page 37 of 79
5. Details of Managing Directors/ Directors/ Partners
S.
No.
Name
Gender
Physically
Handicapped
Community /
Caste
Share (in
%)
6. Employment Information (Full-Time Employees for each component of the project to be
shown separately)
Employment
Category
Male (No's)
Female (No's)
Total (No's)
Management & Staff
Supervisors
Workers
Third party
Total
4.1
Plot/Survey No.
4.3
City/Town
4.5
Mandal/ EMC
4.7
Email ID
4.2
Street/Village Name
4.4
District
4.6
Pin Code
4.8
Telephone Number
Page 38 of 79
7. Enterprise Information
8. Uploads - Registration Certificate & Land Lease/ Sale Agreement / Sale Deed
9. Line of Activity (to be submitted for each component of the project separately)
S. No.
Line of activity
Units
Annual Capacity
Value (in INR
Lakhs)
10.
Fixed Capital Investment details
S. No.
Nature of Assets
New Enterprise
Investment
Amount (in INR
Lakhs)
7.1 Sector of Enterprise
7.3 Total Investment (Plant &
Machinery) (in INR lakhs)
7.5 Type of Registration
7.7 Date of Registration
(DD/MM/YYYY)
7.9 Date of Commencement of
Commercial Production
(DD/MM/YYYY)
7.10.a Date of Lease/Sale
Agreement/Sale Deed
(DD/MM/YYYY)
7.2 Type of Enterprise
7.4 Category of Enterprise
7.6 Registration Number
7.8 Major Line of Activity
7.10 Type of Land
7.10.b Lease applicable till
(DD/MM/YYYY)
Page 39 of 79
1
Land
2
Buildings
3
Plant & Machinery
4
Total
For expansion/ diversification, additional fields include expansion/diversification investment
amount and percentage increase (auto calculated on initial investment amount).
11.
Financing of Enterprise
Financing of Enterprise
Bank and NBFC / Self-financed
11.1 Uploads:
A. Banks & NFC
1) Statement of Accounts
2) Term Loan Sanction Letter
3) Civil Engineer Certificate on civil works
4) Board resolution/ partnership deed
5) Secondhand machinery certificate (Chartered Accountant & c)
6) Self-fabricated machinery (certified by Chartered Engineer)
7) Bills and invoices
8) Power release certificate
B. Self-Financed
1) Machinery certificate (certified by Chartered Accountant)
2) Secondhand machinery certificate (Chartered Accountant & Chartered Engineer)
3) Self-fabricated machinery (Chartered Engineer)
4) Civil Engineer Certificate on civil works
Page 40 of 79
5) Power release certificate
6) Board resolution/ partnership deed
7) Bills and invoices
8) Certificates such as Chief Financial Officer etc. are auto populated
11.2 Details of Financial Institution and Loan amounts (Only for Banks &
NBFCs)
d
11.3 Project Cost, Loan Sanctions and Release, Assets Acquired (in Lakhs)
(Only for Banks & NBFCs)
Nature of
Asset
Approved
Project
Cost
Quantum
of Loan
Sanctioned
Enterprise
Share
Loan
Received
Assets
Acquired
to the
extent of
Loan
Released
Assets which
form Part of
approved
Project Cost
but
loan was not
drawn
Total
acquired
Land
Buildings
Plant & M/c.
Machinery
contingencies
Erection
Technical
know-how,
Term
loan
sanction
Name of
Financial
Institution
Branch &
Address
of
Financial
Institution
Date of Filling
of Application
(DD/MM/YYYY)
Sanction
Reference
Number
Date of
Sanction
(DD/MM/YYYY)
Amount
Sanctione
Page 41 of 79
Nature of
Asset
Approved
Project
Cost
Quantum
of Loan
Sanctioned
Enterprise
Share
Loan
Received
Assets
Acquired
to the
extent of
Loan
Released
Assets which
form Part of
approved
Project Cost
but
loan was not
drawn
Total
acquired
feasibility
study
Working
capital
Total
11.4 Details of machinery
Name of
the
machine/
server with
specificatio
ns
Conditio
n of
Machine
/ server
Imported
directly by
entreprene
ur
Name
of
Suppli
er
Suppli
er
GST
Numb
er
Date of
placement of
order
(DD/MM/YY
YY)
e-way
Bill No
Bill
Date
(DD/M
M/YY
YY)
Amount of
the bill
including
freight,
Insurance,
taxes, etc.
(in lakhs)
12.
Power Details
S.No. Source of Power
Total Power
Connected
Units
Date of Power Connection
(DD/MM/YYYY)
Page 42 of 79
13.
Bank Details (for incentives disbursement)
Type of
Account
Bank Name Branch
IFSC Code Account
No.
Re-enter
Account No.
Upload
Canceled
cheque leaf
Note: Investor can enter multiple bank accounts such as term loan account, working capital loan
account etc.
14.
Other Details
S.No
List of Categories
Yes/No
Date
Upload
Document
Remarks
1. Has there been a break in
production of the enterprise?
2. Has the enterprise been
purchased from other sources?
3. Has there been a merger of the
enterprise?
4. Has there been an amalgamation of the
enterprise?
5. Has there been a change in
management of the enterprise?
6. Does enterprise have any additional
Line of Activity?
7.
Whether enterprise separate Identifiable
Investment?
Page 43 of 79
Declaration
1. I / We hereby confirm that the contents of the claim application are true to the best of my
/our knowledge.
2. I am authorized to file this application and I will take full responsibility of the information
mentioned. I /We hereby confirm that to the best of our knowledge and belief, information
given herein before, and other papers enclosed are true and correct in all respects. We further
undertake to substantiate the particulars about promoter(s) and other details with
documentary evidence as and when called for. I/We hereby agree that I/We shall forthwith
repay the amount released to me/us under scheme, if the amount of incentive under any
category are found to be disbursed in excess of the amount admissible whatsoever the
reason.
3. Authorization by the other Partners/ Board of Directors Resolution wherein the Name,
Designation and signature are attested.
4. I / We abide by the provision under the G.O., State Incentives and further abide by the
changes / modifications made by the State Government. I / We also abide by the decisions of
IT,E&C Department.
5. I / We shall not change the location of the whole or part of the enterprise effect any substantial
contraction or disposal of substantial part of its total capital investment within a period of six
(6)/ eight (8) years from the DCP as applicable.
6. I / We assure that the State incentives applied for will be used solely for the development of
the Enterprise and shall produce utilization certificate to the IT,E&C Department/ APEITA
within one year and furnish annual progress report and certified copy of audited accounts to
the IT,E&C Department/ APEITA for a period of six (6)/ eight (8) years as applicable.
7. In case a claim is made as a Benami as defined under Benami Transactions Act 2016, I
understand that action shall be taken against me as per respective provisions of the Act.
8. In case of a wrong claim I shall repay the entire amount of concession(s) availed under the
G.O. in Lump sum with interest, as specified by CCITEI.
9. I / We shall agree that apart from other consequences, I / We will forego the eligibility for the
continuance of incentives and other financial concessions for future years if these incentives
/ financial concessions were obtained by misrepresentation of facts or in case of misutilization.
I / We not only agree to pay back these incentives / financial concessions but also authorize
State Government to call back the same through summary proceedings under the provisions
of R.R. Act 1864
Place:
Signature of Authorized Person with name Designation & Firm/ Office Seal:
Date :
Page 44 of 79
1. Personal Details
FORM – 2
Investment Subsidy
1.1 Promoter's/ Managing Director's Name
Mr./ Ms. / Mrs.
1.2 Father's/Husband's Name
C/O/ W/O S/O
D/O
1.3 Aadhaar Number
1.4 Mobile Number
2. Office Address
3. Enterprise Name
3.1 Name of the Enterprise
3.2 Type of Enterprise
3.3 Nature of Enterprise
3.4 Category of Enterprise
(General / SC / ST / BC / Women / MSE)
3.5 PAN
3.6 GST No
3.7 GST Certificate
FORM 2- INVESTMENT SUBSIDY
2.1 Plot/ Survey No.
2.2 City/ Town
2.3 State
2.4 Pin Code
2.5 Fax
2.6 Street/ Village Name
2.7 Country
2.8 District
2.9 Email ID
2.10 Telephone
Number (Including STD
and ISD Code)
Page 45 of 79
4. Enterprise Location Details
5. Details of Land Purchased
S.No
Area
(in sqm)
Value as
per
approved
project
cost (in
INR)
Purchase
Value
(in INR)
Stamp
Duty
(in INR)
Registratio
n Fees
(in INR)
Building
Plinth
Area (in
Sqm.)
Eligible
Value of
Land
(in INR)
6. Details of Factory Building
S.No
Item
Actual Cost
as per Civil
Engineer
Certificate
Cost as
per
APSFC
Rates
Calculation
Details as per
APSFC Rates
1
Main factory shed
2
Raw material and finished products
godowns
3
Office room and lab room
4
Clean room
5
Cooling water ponds
6
Boiler shed and generator room
7
Effluent treatment plant/ ponds etc.
8
Overhead tanks, bore-wells and pump
4.1
Plot/Survey No.
4.3
City/Town
4.5
Mandal
4.7
Email ID
4.2
Street/Village Name
(EMC list /Dropdown)
4.4
District
4.6
Pin Code
4.8
Telephone Number
Page 46 of 79
house and sump
9
Fencing and gate
10
Architect fees and supervision
charges
11
Compound wall
12
Canteen
13
Workers rest room
14
Cycle/ vehicle stand
15
Security shed
16
Toilet room & sanitary fittings
17
Total
*APSFC – Andhra Pradesh State Financial Corporation
7. Documents
Civil Engineer Certificate
(Upload)
Approved Area Certificate by Town & Country Planning
(Auto populated)
Chartered Engineer Certificate for self-fabricated Machinery (Upload)
8. Details of Machinery (Auto-populated)
S.No Name of
the
machine
with
specific
ations
Conditi
on of
Machin
e
Importe
d
directly
by
entrepre
neur
Name of
Supplier
Supplier
GST
Number
Date of
placement
of order
(DD/MM/Y
YYY)
e-way Bill
No
Bill Date
(DD/MM/Y
Y YY)
Amount
of the bill
including
freight,
Insurance
, taxes,
etc.
(in lakhs)
Page 47 of 79
Page 48 of 79
9. Total Eligible Value of Plant and Machinery (in INR): (Auto populated)
Computed Cost for Land, Factory and Machinery
S.No.
Parameter
Value
1
Eligible cost of land for investment subsidy
2
Eligible cost of factory, building for investment subsidy
3
Eligible cost of machinery for investment subsidy
4
Total eligible capital investment
5
Eligible investment subsidy in %
6
Eligible investment subsidy in % as per the application date
7
Total Eligible investment subsidy (Value)
Declaration
1. I / We hereby confirm that the contents of the claim application are true to the best of my
/our knowledge.
2. I am authorized to file this application and I will take full responsibility for the information
mentioned. I /We hereby confirm that to the best of our knowledge and belief, information
given herein before and other papers enclosed are true and correct in all respects. We further
undertake to substantiate the particulars about promoter(s) and other details with
documentary evidence as and when called for. I/We hereby agree that I/We shall forthwith
repay the amount released to me/us under scheme, if the amount of incentive under any
category are found to be disbursed in excess of the amount admissible whatsoever the
reason.
3. Authorization by the other Partners/ Board of Directors Resolution wherein the Name,
Designation and signature are attested.
4. I / We abide by the provision under the G.O., State Incentives and further abide by the
changes / modifications made by the State Government. I / We also abide by the decisions of
IT,E&C Department.
5. I / We shall not change the location of the whole or part of the enterprise/ industry or effect
any substantial contraction or disposal of substantial part of its total capital investment within
a period of six (6)/ eight (8) years from the DCP as applicable.
6. I / We assure that the State incentives applied for will be used solely for the development of
the Enterprise and shall produce utilization certificate to the IT,E&C Department/ APEITA
within one year and furnish annual progress report and certified copy of audited accounts to
the IT,E&C Department/ APEITA for a period of six (6)/ eight (8) years as applicable.
Page 49 of 79
7. In case a claim is made as a Benami as defined under Benami Transactions Act 2016, I
understand that action shall be taken against me as per respective provisions of the act.
8. In case of a wrong claim I shall repay the entire amount of concession(s) availed under the
policy in Lump sum with interest, as specified by the CCITEI.
9. I / We shall agree that apart from other consequences, I / We will forego the eligibility for the
continuance of incentives and other financial concessions for further years if these incentives
/ financial concessions were obtained by misrepresentation of facts or in case of misutilization.
I / We not only agree to pay back these incentives / financial concessions but also authorize
State Government to call back the same through summary proceedings under the provisions
of R.R. Act 1864.
Place:
Signature of Authorized Person with name Designation & Firm/ Office Seal:
Date :
Page 50 of 79
FORM – 3
Stamp Duty / Registration Fee / Transfer Duty Reimbursement Claim Form
1. Office Address
2. Enterprise Name
2.1 Name of the Enterprise
2.2 Type of Enterprise
2.3 Nature of Enterprise
2.4 Category of Enterprise
(General / SC / ST / BC / Women / MSE)
2.5 PAN
2.6 GST No
2.7 GST Certificate
3. Enterprise Location Details
FORM 3- STAMP DUTY / REGISTRATION FEE / TRANSFER DUTY
REIMBURSEMENT CLAIM FORM
1.1 Plot/ Survey No.
1.2 City/ Town
1.3 State
1.4 Pin Code
1.5 Fax
1.6 Street/ Village Name
1.7 Country
1.8 District
1.9 Email ID
1.10 Telephone
Number (Including
STD and ISD Code)
3.1
Plot/Survey No.
3.3
City/Town
3.5
Mandal
3.7
Email ID
3.2
Street/Village Name
(EMC list dropdown)
3.4
District
3.6
Pin Code
3.8
Telephone Number
Page 51 of 79
4. Enterprise Information
5. Uploads - Registration Certificate & Land Lease/ Sale Agreement / Sale Deed
6. Stamp Duty / Registration Fee / Transfer Duty Reimbursement Details
1
Area of the land Purchased (as per registered sales deed) (in
Sq. Mts)
2
Plinth area of the building (as per approved building plan) (in
Sq. Mts)
3
Five times of the plinth area of factory buildings (in Sq. Mts)
(Auto Populated)
4
Eligible area for reimbursement beyond 5 times plinth area
(in Sq. Mts)
5
Reasons for increase in plinth area
4.1 Sector of Enterprise
4.3 Total Investment (Plant
&Machinery) (in INR lakhs)
4.5 Type of Registration
4.7 Date of Registration
(DD/MM/YYYY)
4.9 Date of Commencement of
Commercial Production
(DD/MM/YYYY)
4.10.a Date of Lease/Sale
Agreement/Sale Deed
(DD/MM/YYYY)
4.2 Type of Enterprise
4.4 Category of Enterprise
4.6 Registration Number
4.8 Major Line of Activity
4.9 Type of Land
4.10 Lease applicable till
(DD/MM/YYYY)
Page 52 of 79
6
Nature of transactions/deed registered for industrial use
(sale/lease-cum- sale Transfer deed/financial deeds and
mortgages etc.)
7
Purchase value of land as per document
8
Date of registration (DD/MM/YYYY)
9
Name of Sub-Registrar Office, where registered
10
Details of payment of stamp duty / registration fee / transfer
duty
Docum
ent No.
Amount of Duty /
Fee Paid (In INR)
Date of
Payment
(DD/MM/YYY
Y)
Registered Land
sale Deed/ Lease
Deed/Transfer
Deed/ Land
Conversion
Documents
Payment
Receipt
Number
Payment
Receipt
(Upload)
(Upload)
1
% reimbursement of stamp Duty
(Auto Populated)
2
Applicable stamp duty reimbursement amount
(Auto Populated)
3
% reimbursement of registration fee
(Auto Populated)
4
Applicable registration fee reimbursement amount
(Auto Populated)
5
% reimbursement of transfer duty
(Auto Populated)
6
Applicable transfer duty reimbursement amount
(Auto Populated)
7
Total reimbursement amount
(Auto Populated)
7. Land Cost Incentive Details (If applicable)
1
Date of payment of land cost
2
Payment Receipt No.
3
% reimbursement of land cost
4
Have you availed any special GO, if Yes, upload
(Upload)
5
Applicable land cost reimbursement amount
(Auto Populated)
Page 53 of 79
6
Final Eligible Land cost incentive amount to be
reimbursed
(Auto
Populated)
Declaration
1. I / We hereby confirm that the contents of the claim application are true to the best
of my /our knowledge.
2. I am authorized to file this application and I will take full responsibility for the
information mentioned. I /We hereby confirm that to the best of our knowledge and
belief, information given herein before and other papers enclosed are true and correct
in all respects. We further undertake to substantiate the particulars about promoter(s)
and other details with documentary evidence as and when called for. I/We hereby
agree that I/We shall forthwith repay the amount released to me/us under scheme, if
the amount of incentive under any category are found to be disbursed in excess of
the amount admissible whatsoever the reason.
3. Authorization by the other Partners/ Board of Directors Resolution wherein the Name,
Designation and signature are attested.
4. I / We abide by the provision under the G.O., State Incentives and further abide by
the changes / modifications made by the State Government. I / We also abide by
the decisions of IT,E&C Department.
5. I / We shall not change the location of the whole or part of the enterprise/ industry or
effect any substantial contraction or disposal of substantial part of its total capital
investment within a period of six (6)/ eight (8) years from the DCP as applicable.
6. I / We assure that the State incentives applied for will be used solely for the
development of the Enterprise and shall produce utilization certificate to the IT,E&C
Department/ APEITA within one year and furnish annual progress report and certified
copy of audited accounts to the IT,E&C Department/ APEITA for a period of six (6)/
eight (8) years as applicable.
7. In case a claim is made as a Benami as defined under Benami Transactions Act
2016, I understand that action shall be taken against me as per respective provisions
of the act.
8. In case of a wrong claim I shall repay the entire amount of concession(s) availed
under the G.O. in Lump sum with interest, as specified by the CCITEI .
9. I / We shall agree that apart from other consequences, I / We will forego the eligibility
for the continuance of incentives and other financial concessions for further years if
these incentives / financial concessions were obtained by misrepresentation of facts
or in case of misutilization. I / We not only agree to pay back these incentives /
financial concessions but also authorize State Government
Page 54 of 79
to call back the same through summary proceedings under the provisions of R.R.
Act 1864
Place:
Signature of Authorized Person with name Designation & Firm/ Office seal:
Date:
Page 55 of 79
1. Enterprise Name
FORM – 4
Power Cost Reimbursement
1.1 Name of the Enterprise
1.2 Type of Enterprise
1.3 Nature of Enterprise
1.4 Category of Enterprise
(General / SC / ST / BC / Women / MSE)
1.5 PAN
1.6 GST No
1.7 GST Certificate
2. Enterprise Location Details
3. Power Cost Reimbursement Details
1
Industrial Service Connection Number
2
Category of Connection (Low Tension / High Tension)
3
Connected Power Load at the time of DCP (in kilo Volt
Amperes)
4
Power Release Date (DD/MM/YYYY)
5
Have you availed any special GO from Government of Andhra
Pradesh
(Auto
populated)
6
Eligible Rate per Unit (As per the GO Uploaded)
FORM 4 - POWER COST REIMBURSEMENT
2.1
Plot/Survey No.
2.3
City/Town
2.5
Mandal
2.7
Email ID
2.2
Street/Village Name
(EMC list dropdown)
2.4
District
2.6
Pin Code
2.8
Telephone Number
Page 56 of 79
7
Upload Relevant GO
(Auto populated)
S.
No.
Source
of
Power
Mont
h to
be
Appli
ed
Year to
be
Applie
d
Units
Consumed
as per
Power Bill
Light &
Fans
and
Colony
Consu
mption
Units
Eligibl
e
Units
as per
Bill
Rat
e
per
Uni
t
Amo
unt
Paid
as
per
Bill
Eligible
Rate
of
Incenti
ve
Eligibl
e
Incenti
ve
Amou
nt
% of
Eligi
ble
Ince
ntive
Amo
unt
Pow
er
Rece
ipt
Po
we
r
Bill
Final eligible incentive amount to be reimbursed: (auto populated)
4. Bank Details (for incentives disbursement)
Type of
Account
Bank Name Branch
IFSC Code Account
No.
Re-enter
Account No.
Upload
Canceled
cheque leaf
5. Other Details
S.
No.
List of Categories
Yes/No
Date
Upload
Document
Remarks
1. Has there been a break in
production of the enterprise?
2. Has the enterprise been
purchased from other sources?
3. Has there been a merger of the
enterprise?
Page 57 of 79
S.
No.
List of Categories
Yes/No
Date
Upload
Document
Remarks
4. Has there been an amalgamation of the
enterprise?
5. Has there been a change in
management of the enterprise?
6. Does enterprise have any additional
Line of Activity?
7. Whether enterprise separate Identifiable
Investment?
Declaration
1. I / We hereby confirm that the contents of the claim application are true to the best of my
/our knowledge.
2. I am authorized to file this application and I will take full responsibility for the information
mentioned. I /We hereby confirm that to the best of our knowledge and belief, information
given herein before and other papers enclosed are true and correct in all respects. We further
undertake to substantiate the particulars about promoter(s) and other details with
documentary evidence as and when called for. I/We hereby agree that I/We shall forthwith
repay the amount released to me/us under scheme, if the amount of incentive under any
category are found to be disbursed in excess of the amount admissible whatsoever the
reason.
3. Authorization by the other Partners/ Board of Directors Resolution wherein the Name,
Designation and signature are attested.
4. I / We abide by the provision under the G.O., State Incentives and further abide by the
changes / modifications made by the State Government. I / We also abide by the decisions of
IT,E&C Department.
5. I / We shall not change the location of the whole or part of the enterprise/ industry or effect
any substantial contraction or disposal of substantial part of its total capital investment within
a period of six (6)/ eight (8) years from the DCP as applicable.
6. I / We assure that the State incentives applied for will be used solely for the development of
the Enterprise and shall produce utilization certificate to the IT,E&C Department/ APEITA
within one year and furnish annual progress report and certified copy of audited accounts to
the IT,E&C Department/ APEITA for a period of six (6)/ eight (8) years as applicable.
7. In case a claim is made as a Benami as defined under Benami Transactions Act 2016, I
understand that action shall be taken against me as per respective provisions of the act.
Page 58 of 79
8. In case of a wrong claim I shall repay the entire amount of concession(s) availed under the
G.O. in Lump sum interest as specified by the CCITEI.
9. I / We shall agree that apart from other consequences, I / We will forego the eligibility for the
continuance of incentives and other financial concessions for further years if these incentives
/ financial concessions were obtained by misrepresentation of facts or in case of misutilization.
I / We not only agree to pay back these incentives / financial concessions but also authorize
State Government to call back the same through summary proceedings under the provisions
of R.R. Act 1864
Place:
Signature of Authorized Person with name Designation & Firm/ Office seal:
Date :
Page 59 of 79
FORM – 5
Interest Subsidy Claim Application Form
1. Personal Details
1.1 Promoter's/ Managing Director's Name
Mr./ Ms. / Mrs.
1.2 Father's/Husband's Name
C/O/ W/O S/O
D/O
1.3 Aadhaar Number
1.4 Mobile Number
2. Office Address
3. Enterprise Name
3.1 Name of the Enterprise
3.2 Type of Enterprise
3.3 Nature of Enterprise
3.4 Category of Enterprise
(General / SC / ST / BC / Women / MSE)
3.5 PAN
3.6 GST No
3.7 GST Certificate
FORM 5 - INTEREST SUBSIDY CLAIM APPLICATION FORM
2.1 Plot/ Survey No.
2.2 City/ Town
2.3 State
2.4 Pin Code
2.5 Fax
2.6 Street/ Village Name
2.7 Country
2.8 District
2.9 Email ID
2.10 Telephone
Number (Including STD
and ISD Code)
Page 60 of 79
4. Enterprise Location Details
5. Enterprise Information
4.1
Plot/Survey No.
4.3
City/Town
4.5
Mandal
4.7
Email ID
4.2
Street/Village Name
EMC list dropdown
4.4
District
4.6
Pin Code
4.8
Telephone Number
5.1 Sector of Enterprise
5.3 Total Investment (Plant &
Machinery) (in INR lakhs)
5.5 Type of Registration
5.7 Date of Registration
(DD/MM/YYYY)
5.9 Date of Commencement of
Commercial Production
(DD/MM/YYYY)
5.10.a Date of Lease/Sale
Agreement/Sale Deed
(DD/MM/YYYY)
5.2 Type of Enterprise
5.4 Category of Enterprise
5.6 Registration Number
5.8 Major Line of Activity
5.9 Type of Land
5.10.Lease applicable till
(DD/MM/YYYY)
Page 61 of 79
6. Fixed Capital Investment details
S. No.
Nature of Assets
New Enterprise
Investment
Amount (in
Lakhs)
1
Land
2
Buildings
3
Plant & Machinery
4
Total
For expansion/ diversification, additional fields include expansion/diversification investment
amount & % increase (auto-calculated on initial investment amount).
7. Financing of Enterprise
Financing of Enterprise
Bank and NBFC / Self-financed
Enter Financial Institute Details
Bank Name
IFSC Code
Bank Address
(auto populated based on IFSC Code)
Bank Proof
(Passbook/ Cancelled Cheque Leaf)
Account Number
Loan Sanctioned Amount
Date of Sanction
(Can add multiple banks)
Details of Financial Institutions
S.No Bank Name
Bank Address
Proof
Account No.
Loan
Sanctioned
Date of
Sanction
Page 62 of 79
(in INR)
Auto populated based on above details
Upon clicking each bank:
S.No Date of disbursement of term loan
Loan Amount disbursed
(in INR)
Remarks
1) Is moratorium period applicable: Yes/No
2) Rate of Interest:
3) Repayment Installment type: Monthly/ Quarterly/ Semi-Annual/ Annual
4) Total No. of Installments:
5) Projected Installment Amount:
Da
Outstan
Installm
Interest
Interes
Eligib
Eligi
Eligible
Eligible
Final
te
ding
ent No
Payable
t paid
le
ble
amoun
% as
Eligible
Term
as per
by the
Intere
Rate
t
per
Amount of
Loan
projecte
unit to
st
of
applica
applicat
Reimburse
due after
d
the
Amo
inter
ble for
ion date
ment
repayme
installm
financi
unt
est
subsid
nt of
ent (in
al
per
y
installm
INR)
institut
annu
ent
(diminis
ion
m
hing the
during
principal
the
amount)
period
8. Documents to be uploaded
a. Interest Paid Certificate
b. Loan Disbursement Certificate
c. Bank Certificate on Status of Loan
d. Loan agreement
e. Bank certified loan account statement
f. Annual audited financial statements for the project
g. Professional tax/ EPF proof
Page 63 of 79
h. Bank certificate for proof of salary disbursement for entire claim period
i.
3rd party verification report for proof of employment (CII/ any other industry body
approved by CCITEI)
j.
Valuation of eligible project costs by certified Chartered Engineer and Chartered
Accountant
k. Project cost valuation by financial institutions funding the project
l.
Consent for operations
For the above certificates, we shall approve standard certificates issued by bank on its official
letterhead.
9. Project Cost, Loan Sanctions and Release, Assets Acquired (in Lakhs) (Only for Banks &
NBFCs)
Nature of
Asset
Approved
Project
Cost
Quantum
of Loan
Sanctioned
Enterprise
Share
Loan
Received
Assets
Acquired
to the
extent of
Loan
Released
Assets which
form Part of
approved
Project Cost,
but loan was
not drawn
Total
acquired.
Land
Buildings
Plant & M/c.
Machinery
contingencies
Erection
Technical
know-how,
feasibility
study
Working
capital
Total
Declaration
1. I / We hereby confirm that the contents of the claim application are true to the best of my
/our knowledge.
2. I am authorized to file this application and I will take full responsibility for the information
mentioned. I /We hereby confirm that to the best of our knowledge and belief, information
given herein before and other papers enclosed are true and correct in all respects. We further
undertake to substantiate the particulars about promoter(s) and other details with
documentary evidence as and when called for. I/We hereby agree that I/We shall forthwith
Page 64 of 79
repay the amount released to me/us under scheme, if the amount of incentive under any
category are found to be disbursed in excess of the amount admissible whatsoever the
reason.
3. Authorization by the other Partners/ Board of Directors Resolution wherein the Name,
Designation and signature are attested.
4. I / We abide by the provision under the G.O., State Incentives and further abide by the
changes / modifications made by the State Government. I / We also abide by the decisions of
IT,E&C Department.
5. I / We shall not change the location of the whole or part of the enterprise/ industry or effect
any substantial contraction or disposal of substantial part of its total capital investment within
a period of six (6)/ eight (8) years from the DCP as applicable.
6. I / We assure that the State incentives applied for will be used solely for the development of
the Enterprise and shall produce utilization certificate to the IT,E&C Department/ APEITA
within one year and furnish annual progress report and certified copy of audited accounts to
the IT,E&C Department/ APEITA for a period of six (6)/ eight (8) years as applicable.
7. In case a claim is made as a Benami as defined under Benami Transactions Act 2016, I
understand that action shall be taken against me as per respective provisions of the act.
8. In case of a wrong claim I shall repay the entire amount of concession(s) availed under the
G.O. in Lump sum with interest as specified by the CCITEI.
9. I / We shall agree that apart from other consequences, I / We will forego the eligibility for the
continuance of incentives and other financial concessions for further years if these incentives
/ financial concessions were obtained by misrepresentation of facts or in case of misutilization.
I / We not only agree to pay back these incentives / financial concessions but also authorize
State Government to call back the same through summary proceedings under the provisions
of R.R. Act 1864
Place:
Signature of Authorized Person with name Designation & Firm/ Office seal:
Date :
Page 65 of 79
FORM – 6
SGST Reimbursement Claim Form
1. Personal Details
1.1 Promoter's/ Managing Director's Name
Mr./ Ms. / Mrs.
1.2 Father's/Husband's Name
C/O/ W/O S/O
D/O
1.3 Aadhaar Number
1.4 Mobile Number
2. Office Address
3. Enterprise Name
3.1 Name of the Enterprise
3.2 Type of Enterprise
3.3 Nature of Enterprise
3.4 Category of Enterprise
(General / SC / ST / BC / Women / MSE)
3.5 PAN
3.6 GST No
3.7 GST Certificate
4. Enterprise Location Details
FORM 6 - SGST REIMBURSEMENT CLAIM FORM
2.1 Plot/ Survey No.
2.2 City/ Town
2.3 State
2.4 Pin Code
2.5 Fax
2.6 Street/ Village Name
2.7 Country
2.8 District
2.9 Email ID
2.10 Telephone
Number (Including STD
and ISD Code)
Page 66 of 79
5. Enterprise Information
5.1 Sector of Enterprise
5.2 Type of Enterprise
5.3 Total Investment (Plant &
Machinery) (in INR lakhs)
5.4 Category of Enterprise
5.6 Registration Number
5.5 Type of Registration
5.8 Major Line of Activity
5.7 Date of Registration
(DD/MM/YYYY)
5.9 Date of Commencement of
Commercial Production
(DD/MM/YYYY)
5.9 Type of Land
5.10.Lease applicable till
(DD/MM/YYYY)
5.10.a Date of Lease/Sale
Agreement/Sale
Deed
(DD/MM/YYYY)
6. Fixed Capital Investment details
S. No.
Nature of Assets
New Enterprise
Investment
Amount (in
Lakhs)
1
Land
2
3
Plant & Machinery
4
Total
For expansion/ diversification, additional fields include expansion/diversification investment
amount & % increase (auto calculated on initial investment amount).
7. GST Paid (in INR)
4.1
Plot/Survey No.
4.3
City/Town
4.5
Mandal
4.7
Email ID
4.2
Street/Village Name
EMC list dropdown
4.4
District
4.6
Pin Code
4.8
Telephone Number
Page 67 of 79
Nature of GST Paid
Month
(INR)
(1)
(2)
(3)
SGST
CGST
IGST
Total GST
6
Sales Tax Regn. No & Date
APGST
7
Installed capacity of the existing
Enterprise as certified by the
financial institution/ chartered
8
SGST reimbursement already
availed by Enterprise from the
Date of Commencement
of
Production.
1styear(20
–20) INR
2ndyear(20
–20) INR
3rdyear(20
–20) INR
4thyear(20
–20) INR
5thyear(20
–20) INR
6thyear(20
–20) INR
7thyear(20
–20) INR
Total
INR
9
Claim application submitted by the
Enterprise/Industry for the Year:
10
Net SGST accrued to the state
during the year as certified by
Commercial Tax Department
INR
11
100% Reimbursement amount
claimed by the Enterprise
INR
Page 68 of 79
8. Documents to be uploaded
a. GSTR-3B and GSTR-2A (as amended by the Government of India from time to time)
for reimbursement of Net SGST.
b. Audited annual financial statements for the project
c. 3rd party verification report for proof of employment (CII/ any other industry body
approved by CCITEI)
d. Valuation of eligible project costs by certified Chartered Engineer and Chartered
Accountant
e. Project cost valuation by financial institutions funding the project
f. Consent for operations
g. Net SGST accrued to the state and being claimed by the company, certified by the
Revenue (Commercial Tax) department
h. Bank certificate for proof of salary disbursement for entire claim period
Declaration
1. I / We hereby confirm that the contents of the claim application are true to the best of my
/our knowledge.
2. I am authorized to file this application and I will take full responsibility for the information
mentioned. I /We hereby confirm that to the best of our knowledge and belief, information
given herein before and other papers enclosed are true and correct in all respects. We further
undertake to substantiate the particulars about promoter(s) and other details with
documentary evidence as and when called for. I/We hereby agree that I/We shall forthwith
repay the amount released to me/us under scheme, if the amount of incentive under any
category are found to be disbursed in excess of the amount admissible whatsoever the
reason.
3. Authorization by the other Partners/ Board of Directors Resolution wherein the Name,
Designation and signature are attested.
4. I / We abide by the provision under the G.O., State Incentives and further abide by the
changes / modifications made by the State Government. I / We also abide by the decisions of
IT,E&C Department.
5. I / We shall not change the location of the whole or part of the enterprise/ industry or effect
any substantial contraction or disposal of substantial part of its total capital investment within
a period of six (6)/ eight (8) years from the DCP as applicable.
6. I / We assure that the State incentives applied for will be used solely for the development of
the Enterprise and shall produce utilization certificate to the IT,E&C Department/ APEITA
within one year and furnish annual progress report and certified copy of audited accounts to
the IT,E&C Department/ APEITA for a period of six (6)/ eight (8) years as applicable.
7. In case a claim is made as a Benami as defined under Benami Transactions Act 2016, I
understand that action shall be taken against me as per respective provisions of the act.
Page 69 of 79
8. In case of a wrong claim I shall repay the entire amount of concession(s) availed under the
G.O. in Lump sum with interest, as specified by the CCITEI.
9. I / We shall agree that apart from other consequences, I / We will forego the eligibility for the
continuance of incentives and other financial concessions for further years if these incentives
/ financial concessions were obtained by misrepresentation of facts or in case of misutilization.
I / We not only agree to pay back these incentives / financial concessions but also authorize
State Government to call back the same through summary proceedings under the provisions
of R.R. Act 1864
Place:
Signature of Authorized Person with name Designation & Firm/ Office seal:
Date :
Page 70 of 79
1. Personal Details
FORM – 7
Transport Subsidy Claim Form
1.1 Promoter's/ Managing Director's Name
Mr./ Ms. / Mrs.
1.2 Father's/Husband's Name
C/O/ W/O S/O
D/O
1.3 Aadhaar Number
1.4 Mobile Number
2. Office Address
3. Enterprise Name
3.1 Name of the Enterprise
3.2 Type of Enterprise
3.3 Nature of Enterprise
3.4 PAN
3.5 GST No
3.6 GST Certificate
FORM 7 - TRANSPORT SUBSIDY CLAIM FORM
2.1 Plot/ Survey No.
2.2 City/ Town
2.3 State
2.4 Pin Code
2.5 Fax
2.6 Street/ Village Name
2.7 Country
2.8 District
2.9 Email ID
2.10 Telephone
Number (Including STD
and ISD Code)
Page 71 of 79
4. Enterprise Location Details
5. Employment Information (Full-time Employees for each component of the project to be shown
separately)
Employment
Category
Male (No's)
Female (No's)
Total (No's)
Management & Staff
Supervisors
Workers
Third party
Total
6. Details of Domestic Transportation Cost (on eligible items with clear breakup)
S. No.
Month
Financial Year
Transportation Cost
(in INR)
7. Details of Cost incurred on import of manufacturing equipment on relocation:
Relocation of industry: (Yes /No)
Original Location: (Country / State / location)
First Time Claim (Yes / No)
S.
No.
Plant /
Machinery
Details
Month
Financial
Year
FOB
Value
(in INR)
CIF Value
(in INR)
Insurance
Cost
(in INR)
Freight
Cost
(in INR)
4.1
Plot/Survey No.
4.3
City/Town
4.5
Mandal
4.7
Email ID
4.2
Street/Village Name
(EMC list /Dropdown)
4.4
District
4.6
Pin Code
4.8
Telephone Number
Page 72 of 79
8. Total Eligible Incentive
S. No.
Parameter
Value
1
Total Cost of Domestic Transport
2
Total Cost incurred on import of manufacturing equipment on
relocation
3
Total Eligible Incentive on Domestic Transport
4
Total Eligible Incentive on import of manufacturing equipment on
relocation
9. Bank Details (for incentives disbursement)
Type of
Account
Bank
Name
Branch
IFSC Code Account
No.
Re-enter
Account No.
Upload
Canceled
cheque leaf
10. Documents to be uploaded:
a. Annual audited financial statements
b. e-Way bills
c. Purchase Order, invoice and goods receipt note for equipment purchase
d. Customs/ duty clearance receipts for imported equipment
e. Valuation of imported equipment certified by a Chartered Engineer/ customs
f. Original logistics invoices along with proof of payment of such bills (bank statement/
payment receipt)
g. Consent for operations
h. Professional tax/ EPF proof
i.
3rd party verification report for proof of employment (CII/ any other industry body
approved by CCITEI)
Declaration
1. I / We hereby confirm that the contents of the claim application are true to the best of my
/our knowledge.
2. I am authorized to file this application and I will take full responsibility of the information
mentioned. I /We hereby confirm that to the best of our knowledge and belief, information
Page 73 of 79
given herein before and other papers enclosed are true and correct in all respects. We further
undertake to substantiate the particulars about promoter(s) and other details with
documentary evidence as and when called for. I/We hereby agree that I/We shall forthwith
repay the amount released to me/us under scheme, if the amount of incentive under any
category are found to be disbursed in excess of the amount admissible whatsoever the
reason.
3. Authorization by the other Partners/ Board of Directors Resolution wherein the Name,
Designation and signature are attested.
4. I / We abide by the provision under the G.O., State Incentives and further abide by the
changes / modifications made by the State Government. I / We also abide by the decisions of
IT,E&C Department.
5. I / We shall not change the location of the whole or part of the enterprise/ industry or effect
any substantial contraction or disposal of substantial part of its total capital investment within
a period of six (6)/ eight (8) years from the DCP as applicable.
6. I / We assure that the State incentives applied for will be used solely for the development of
the Enterprise and shall produce utilization certificate to the IT,E&C Department/ APEITA
within one year and furnish annual progress report and certified copy of audited accounts to
the IT,E&C Department/ APEITA for a period of six (6)/ eight (8) years as applicable.
7. In case a claim is made as a Benami as defined under Benami Transactions Act 2016, I
understand that action shall be taken against me as per respective provisions of the act.
8. In case of a wrong claim I shall repay the entire amount of concession(s) availed under the
G.O. in Lump sum with interest, as specified by the CCITEI.
9. I / We shall agree that apart from other consequences, I / We will forego the eligibility for the
continuance of incentives and other financial concessions for further years if these incentives
/ financial concessions were obtained by misrepresentation of facts or in case of misutilization.
I / We not only agree to pay back these incentives / financial concessions but also authorize
State Government to call back the same through summary proceedings under the provisions
of R.R. Act 1864
Place:
Signature of Authorized Person with name Designation & Firm/ Office seal:
Date :
Page 74 of 79
1. Personal Details
FORM – 8
Production Linked Incentive Claim Form
1.1 Promoter's/ Managing Director's Name
Mr./ Ms. / Mrs.
1.2 Father's/Husband's Name
C/O/ W/O S/O
D/O
1.3 Aadhaar Number
1.4 Mobile Number
2. Office Address
3. Enterprise Name
3.1 Name of the Enterprise
3.2 Type of Enterprise
3.3 Nature of Enterprise
3.4 Category of Enterprise
(General / SC / ST / BC / Women / MSE)
3.5 PAN
3.6 GST No
3.7 GST Certificate
FORM 8 - PRODUCTION LINKED INCENTIVE CLAIM FORM
2.1 Plot/ Survey No.
2.2 City/ Town
2.3 State
2.4 Pin Code
2.5 Fax
2.6 Street/ Village Name
2.7 Country
2.8 District
2.9 Email ID
2.10 Telephone
Number (Including STD
and ISD Code)
Page 75 of 79
4. Enterprise Location Details
5. Employment Information (Full-Time Employees for each component of the project to be
shown separately)
Employment Category
Male (No's)
Female (No's)
Total (No's)
Management & Staff
Supervisors
Workers
Third party
Total
6. Details of Land Purchased
S. No.
Area
(in sqm)
Value as
per
approved
project
cost (in
INR)
Purchase
Value
(in INR)
Stamp
Duty
(in INR)
Registrati
on Fees
(in INR)
Building
Plinth Area
(in Sqm.)
Eligible
Value of
Land
(in INR)
7. Details of Factory Building
4.1
Plot/Survey No.
4.3
City/Town
4.5
Mandal
4.7
Email ID
4.2
Street/Village Name
(EMC list /Dropdown)
4.4
District
4.6
Pin Code
4.8
Telephone Number
Page 76 of 79
S.No
Item
Actual Cost
as per Civil
Engineer
Certificate
Cost as
per
APSFC
Rates
Calculation
Details as per
APSFC Rates
1
Main factory shed
2
Raw material and finished products
godowns
3
Office room and lab room
4
Clean room
5
Cooling water ponds
6
Boiler shed and generator room
7
Effluent treatment plant/ ponds etc.
8
Overhead tanks, bore-wells and pump
house and sump
9
Fencing and gate
10
Architect fees and supervision
charges
11
Compound wall
12
Canteen
13
Workers rest room
14
Cycle/ vehicle stand
15
Security shed
16
Toilet room & sanitary fittings
17
Total
8. Documents
Civil Engineer Certificate
(Upload)
Approved Area Certificate by Town & Country Planning
(Auto populated)
Chartered Engineer Certificate for self-fabricated Machinery (Upload)
9. Details of Machinery (Auto-populated)
S.
No.
Name
of the
machin
Condi
tion of
Machi
Import
ed
directl
Name of
Supplier
Supplier
GST
Number
Date of
placeme
nt of
e-way
Bill No
Bill Date
(DD/MM/
YY YY)
Amount
of the
bill
Page 77 of 79
e with
specifi
cations
ne
y by
entrepr
eneur
order
(DD/MM/
YYYY)
includin
g
freight,
Insuran
ce,
taxes,
etc.
(in
lakhs)
10. Total Eligible Value of Fixed Capital Investment (in INR): (Auto populated)
Computed Cost for Land, Factory and Machinery
S. No.
Parameter
Value
1
Total Cost of Land
2
Total Cost of factory, building
3
Total Cost of machinery
4
Total eligible Fixed Capital Investment
11. Production Linked Incentive (in INR):
S. No.
Parameter
Value
1
Base year Revenue
2
Current Financial Year
3
Current Financial Year Revenue
4
Incremental Revenue – Current Financial Year
5
% of PLI applicable – Current Financial Year
6
Total Incentive Applicable
12. Documents to be uploaded:
a. Annual audited financial statements of the project for base year and claim year
b. GST returns for base year and claim year
c. Consent for operations
d. Professional tax/ EPF proof
e. Bank certificate for proof of salary disbursement for entire claim period
f. DPR submitted to IT,E&C Department
g. 3rdparty verification report for proof of employment (CII/ any other body appointed by
CCITEI)
Page 78 of 79
Declaration
1. I / We hereby confirm that the contents of the claim application are true to the best of my
/our knowledge.
2. I am authorized to file this application and I will take full responsibility for the information
mentioned. I /We hereby confirm that to the best of our knowledge and belief, information
given herein before and other papers enclosed are true and correct in all respects. We further
undertake to substantiate the particulars about promoter(s) and other details with
documentary evidence as and when called for. I/We hereby agree that I/We shall forthwith
repay the amount released to me/us under scheme, if the amount of incentive under any
category are found to be disbursed in excess of the amount admissible whatsoever the
reason.
3. Authorization by the other Partners/ Board of Directors Resolution wherein the Name,
Designation and signature are attested.
4. I / We abide by the provision under the G.O., State Incentives and further abide by the
changes / modifications made by the State Government. I / We also abide by the decisions of
IT,E&C Department.
5. I / We shall not change the location of the whole or part of the enterprise/ industry or effect
any substantial contraction or disposal of substantial part of its total capital investment within
a period of six (6)/ eight (8) years from the DCP as applicable.
6. I / We assure that the State incentives applied for will be used solely for the development of
the Enterprise and shall produce utilization certificate to the IT,E&C Department/ APEITA
within one year and furnish annual progress report and certified copy of audited accounts to
the IT,E&C Department/ APEITA for a period of six (6)/ eight (8) years as applicable.
7. In case a claim is made as a Benami as defined under Benami Transactions Act 2016, I
understand that action shall be taken against me as per respective provisions of the act.
8. In case of a wrong claim I shall repay the entire amount of concession(s) availed under the
G.O. in Lump sum with interest, as specified by the CCITEI.
9. I / We shall agree that apart from other consequences, I / We will forego the eligibility for the
continuance of incentives and other financial concessions for further years if these incentives
/ financial concessions were obtained by misrepresentation of facts or in case of misutilization.
I / We not only agree to pay back these incentives / financial concessions but also authorize
State Government to call back the same through summary proceedings under the provisions
of R.R. Act 1864
Place:
Page 79 of 79
Signature of Authorized Person with name Designation & Firm/ Office seals:
Date: