PART I EXTRAORDINARY
GOVERNMENT OF ANDHRA PRADESH
ABSTRACT
Water Resources Department – CHLIS-Package.IV - Detailed Design and
Construction of Additional Pump House-2a, Associated Civil, Hydro-Mechanical,
Electro-Mechanical, Pressure Main, Sub-Station, DC Transmission line works
including Preparation of LP schedules and other Accessories complete for Drawl and
Lifting of Water in Stage-II (+33.000 to +125.00 Contour) from Leading Channel to
Km 0.000 of Main Canal from Guddigudem(V) West Godavari District and
Construction of Pumphouse-3a and auxiliary works etc., in Stage-III (+115.000 to
+146.000) for Jalleru Reservoir and excavation of Main Canal from Km 68.000 to
Cross Regulator at Km 117.000 of 21 st Branch Canal of NSLBC including CM & CD
works and formation of link canals to Medium Reservoirs including Operation and
Maintenance of the system etc., complete of Chintalapudi Lift Irrigation Scheme for
Providing Irrigation facilities in W.G. Dt., and Krishna Districts – Transfer of Assets of
400/220 kV Substation at Guddigudem(V), Gopalapuram (M) including 400 kV LILO
line to APTRANSCO – Permission – Accorded –- Orders - Issued.
----------------------------------------------------------------------------------------------------------------
WATER RESOURCES (PROJECTS.I) DEPARTMENT
G.O.Rt.No:20 Dated: 12-01-2023
Read:
From the Chief Engineer, Krishna Delta System, Vijayawada, Lr.No.CE/KDS
/VJA/OT-2/AEE-7/CHLIS-PK4/DC VOL-3/2245, Dated:27-12-2022
Registered No. HSE-49/2016
No.58
AMARAVATI, TUESDAY, JANUARY 17, 2023
G.3380
NOTIFICATIONS BY GOVERNMENT
--x--
ORDER:
In the circumstances reported by the Chief Engineer, Krishna Delta System,
Vijayawada in the reference read above, Government after careful examination of
the proposal, hereby accorded permission to Chief Engineer, Krishna Delta System,
Vijayawada for handing over the assets to APTRANSCO by way of 99 years lease
on a nominal rent of one rupee per year and to conclude lease agreement of assets
of 400kV/220kV/11kV substation at Guddigudem(V), Gopalapuram (M) including 400
kV LILO line completely with APTRANSCO, subject to the following terms &
conditions;
1)
The APTRANSCO shall arrange the manning crew and bear all other
Maintenance charges to keep the sub-station good working condition.
2)
The Water Resources Department shall pay a nominal rent of Rs.1/- per
annum by way of 99 years lease to the APTRANSCO.
3)
The Water Resources Department shall reserve the right to withdrawal from
such lease.
2.
The Chief Engineer, Krishna Delta System, Vijayawada shall take necessary
action accordingly.
3.
This
order
is
available
on
online
and
can
be
accessed
at
http://apegazette.cgg.gov.in.
(BY ORDER AND IN THE NAME OF THE GOVERNOR OF ANDHRA PRADESH)
SHASHI BHUSHAN KUMAR
PRINCIPAL SECRETARY TO GOVERNMENT
To
The Chief Engineer, Krishna Delta System, Vijayawada.
Copy to:
The Engineer-in-Chief (Irrigation),Water Resources Department, Vijayawada.
The P.S. to Minister (Water Resources Department).
The P.S. to Secretary (Water Resources Department).
The Chief Engineer, APTRANSCO, Visakhapatnam.
File No. ICD01-MJIR0CEKD/11/2022-PROJECTS-I, Computer no.1946888.
SF/SC
//FORWARDED::BY ORDER//
SECTION OFFICER