PART I EXTRAORDINARY

MUNICIPAL ADMINISTRATION AND URBAN DEVELOPMENT DEPARTMENT

(ANDHRA PRADESH CAPITALREGION DEVELOPMENT AUTHORITY)

FILE.NO:MAU61-DP0AMRV(OTH)/39/2025-DP

NOTIFICATION: On Integrating the conditions of Environment Clearance, CFE and

the Hon'ble NGT with Capital City bye laws.

PublicNotice

(Section-39&41ofAPCRDAAct, 2014)

In exercise of the powers conferred under section 39(1) and 41(3) of

APCRDA Act, 2014 the APCRDA, Vijayawada, as per 45th Authority resolution vide

no. 550/2025 Dt: 02.06.2025, published draft notification for amendments to Zoning

Regulations on incorporation of the conditions of the Environment Clearance, CFE

into Capital City bye laws with respect to Hon'ble NGT. Accordingly, APCRDA invited

for objections/suggestions with respect to said notification within a period of 30 days

from the date of publication. The objections/suggestions received within due date are

examined and disposed.

Registered No. HSE-49/2016

No.761

AMARAVATI, TUESDAY, NOVEMBER 11, 2025

G.746

NOTIFICATIONS BY GOVERNMENT

--x--

Hence notice is hereby given that proposed amendments to Capital City Zoning

Regulations-2016 on incorporation of the conditions of the Environment Clearance,

CFE into Capital City bye laws with respect to Hon'ble NGT as stated below are

notified under section 41(4) of APCRDA Act, 2014. The modifications shall come into

operation from the date of publication of this gazette notification and as appended.

Schedule

Environment Clearance Condition:

Parameter

EC Condition

Proposed

Amendment

to

AmaravatiCapitalCityZoning

Regulations

Water

Condition 6 of EC-Proponent

Rule 606 (1): Align with AP

Management Shall ensure construction of

BuildingRules2017.

Rain water harvesting structures and Rule606(1) maybereadas

Promote rain water storage and use follows

System by considering heavy rains

“1. AllexistingActs/Rulesand

In the area. Proponent shall make

Directions

issued

by

NGT

these as mandatory by

Restrictingdevelopmentactivities

Incorporating in the Bye laws of

near Waterbodies,

Railways,

APCRDA & CA.

Electricallines,Airport,Oil/Gas

Pipelines, Heritage Structures,

Religious Structures and EIA

Notificationshallbefollowedin

Allzones,example

a) RainwaterHarvesting

Structuresshallbeprovidedfor

Allbuildingsirrespectiveofusage

and plot size. Refer to AP

Building Rules, 2017issuedvide

G.O.Ms.No.119,

dt:28/03/2017

Anditssub-sequent

amendments.

b) Provisions

of

the

Andhra

PradeshWater,LandandTrees

Act2002shallbecompliedin

Suchsitesandschemes

Whereverapplicable.”

c)Thedevelopmentpermit

ApplicationsinCapitalCityand

AGCareashouldcomplythe

IGBC/ECBC/GRIHA/EDGE

WhichhelpsinachievingEnergy

efficiency,optimumutilizationof

resourceandpromotes

sustainable renewable energy. A

certificate in this regard shall be

submitted to the authority from the

certifiedexpert

at

the

time

of

application submission.”

d)Alltheresidential,commercial,

institutional developments in plot

area 200 sqm and above rainwater

storage tanks for reuse within the

facility.RefertoAP

Building

rules,2017issued

vide

G.O.Ms.No.119, dt:28/03/2017

anditssub-sequent amendments.

All buildings have a minimum

discharge of 15,000 liters and

above

per

day

or

premises

consisting of 25 dwelling units and

above shall incorporate wastewater

recycling system. The recycled

watershould

be

used

for

horticultural purposes and flushing

purposes A certificate in this regard

shall

be

submitted

by

the

Empanelled Certified expert.

Condition8ofEC-Proponentshall

encourage

low

flow

plumbing

efficient fixtures, sensors, auto

valves, pressure reducing devices

including for toilets, faucet aerators

and shower heads to conserve the

water. Proponent shall incorporate

these guidelines in the Byelaws.

Add to Rule 606 (2): Compliance

with NBC and AP Building Rules

Rule 606 (2) may be read as

follows“2.

Thebuilding

requirements and standards not

covered in these regulations shall

be governed by Andhra Pradesh

Building Rules, 2017 and are to be

complied with National Building

Code.”

“3.The developer shall install

Lowflowplumbingefficient

fixtures,sensors,

Pressure

reducersinwashbasintaps,bath and

other faucets, shower heads etc.”

Certificate

in

this

regard

shallbesubmittedbya

Empanelledcertifiedexpert.

Air &Energy Condition 11 of EC-The Proponent

shall ensure that DG sets shall

comply with noise and emission

normsprescribedbyMoEF&CCin

Environment (Protection) Rules.

Rule

606:

Adherence to

MoEFCC norms under EP Rules

IncorporationRule606.10may

bereadasfollows “DGsets

installed shall comply with noise

andemissionnormsprescribed

byMoEF&CCinEnvironment

(Protection)

Rules”.DG

sets

approvedbyauthorisedagencies

ofGoshallbesubmittedwhile

ApplyingforOC.

Condition13ofEC-The

Proponent

shall ensure installation of solar

panelsbyallbuildingsbyallocating at

least

1/3

of

roof

topfor

this

purpose. This is in addition to

installation

of

solar

heaters.

Proponent shall incorporate these

guidelines in

Byelaws

Rule

606:

Adherence to

MoEFCC norms under EP Rules

IncorporationRule606.11may

beread as follows “The

developershall

Install

solarpanelsbyallocatingat-

least1/3 ofrooftopofthebuildingsin

additiontoinstallationofsolar

heaters”mandatory forall

BuildingsexceptforIndividual

Residential Buildingslessthan

300Sq.mts

Condition14ofEC–Theproponent

shallincorporateenergyefficiency

guidelines (Energy Conservation

BuildingCode). AlltheCapital

complexes,

Commercial,

institutional and major residential

complexes should be constructed

followingGreenBuildingconcepts

andensure

Amendment proposed in rule

606(1)And is read as follows

“Thedevelopmentpermit

applications in CC and AGC area

should comply the

IGBC/ECBC/GRIHA/EDGE

which helps in achieving Energy

efficiency,optimumutilizationof

Energyefficiency,lowcarbonfoot-

print, resources conservation etc.

The Proponent shall ensure that all

the bulk consumers of the energy

shall meet a greater part of their

demand

through

renewable

energies and avoid use of fossil

fuels;

The

Proponent

shall

incorporate these in Byelaws.

Resourcesandpromotes

sustainable renewable energy. A

certificate in this regard shall be

submitted to the authority from

the certified expert at the time of

approval of Building permission.”

Solid Waste Condition20ofECTheproponent

Rule

606:

Compliance

with

Shallensureusageoffly ashfor

MoEFflyash notifications

leveling/reclamationof low lying

IncorporationRule606.12may

areas,

road

embankments,

for Bereadasfollows

raising

platforms

in

inundated Thedevelopersshalluseflyash

areas,andusageofflyashbased

Forlevelling/reclamationoflow

products for construction purpose Lyingareas,roadembankments,

including

fly

ash

bricks,

PPC Forraisingplatformsininundated

cement,

Concrete

etc.,

in areas,orflyashbasedproducts

Compliance

with

Fly

Ash Including flyashbricks,PPC

NotificationissuedbytheMoEF

cement,

Concrete

etc.,

for

under

Environment

(Protection) construction

purpose

in

Act.

The

proponent

shall Constructionincompliancewith

Incorporateusageofflyashby

MoEFflyashnotifications.A

ConstructionagenciesintheBye-

Certificateinthisregardshallbe

Laws.

Submittedbytheapplicantwhile

Atthetimeof OC.

Ecology

& Condition

13

of

EC

-

All Rule

606:

ASI

Notification

Heritage

archaeological,

cultural

and ComplianceunderAMASRAct

ecologically sensitive

areas

(i.e. IncorporationRule606.13may

estuaries,

mangroves,

rocky be read as follows

shores,cavesetc.)inandaround

no development activity shall

the

Amaravati

capital

city

be take placein contraventiontothe

adequately

protected

and ancient

monuments

and

conserved.Theproponentshall

Archaeologicalsitesandremains

take

appropriate

measures

for act,1958

ProtectionofUndavallicaves.The

proponent

hasto declare

no

DevelopmentactivityZoneof100

to 300mtrs. Around

Undavalli

caves as per ASI regulations

Condition 15 & 26 of EC -

Development of the green belts,

green

corridors,

avenue

plantations etc., be made only with

the native

species with multiple uses, and the

plantation should not affect the

native species diversity and shall

help enhance carbon stocks

Deep

rooted

large

foliage

plantation along the side of the

roads and in the open spaces shall

be developed to act as sinks of air

pollutants.

Rule

606:

Plantation

Specifications as per guidelines

of APCRDA advisory Committee

on greenery

IncorporationRule606.14maybe

read as follows “The developers

shall

develop

greenery

with

Native and Deep-rooted Trees in

Open

Spaces

as

per

the

guidelines of APCRDA advisory

Committee on greenery.

Disaster

Management

Condition 2 of EC - The proponent

shall prepare earthquake response

management plan by considering

the location of the city in the class

III seismic zone. The proponent

shall incorporate structural design

requirements

of

buildings

for

Seismic Zone III in the Byelaws.

Rule

606:

Consideration

of

Capital City zone as Seismic

Zone III for Earthquake Resistant

Structural Analysis.

Rule 606.4 may be read follows

“Building and structures shall be

designed for compliance with

earthquake

resistance

considering the Capital City as

Seismic Zone III and wind loads.

Structural stability Certificate by

structural engineer shall mention

that

the

norms

have

been

followed

in

the

design

and

construction

of

buildings

for

making the buildings resistant to

earthquake and wind loads (in

case of applicable

structures)”.

Construction

Phase

Condition 2 of EC - The Proponent

shallensurefollowingmitigation

Rule

606:

Environmental

management measures

Controls

measures

as

committed

to Rule606.15maybereadfollows

Minimizepollutionproblemsduring

the

developer shall minimise

Constructionstage.

pollution

during

construction

All

the

loose

material

either stage. Dust Suppression and

Stackedortransportedshallbe

Fugitive emission control

provided with suitable covering measures,noise control.

Suchastarpaulinsetc.

Measuresusingbarriers,

Watersprinklingshallbedoneat

mufflers,waterpollutioncontrol

Thelocationwheredustgeneration

Measuresbyinstallingtemporary

Isanticipated.

STPsfortreatmentofsewage

Constructionequipmentbe

Fromthelabourcampandsludgedis

posalatauthorized facility,

Maintainedandservicedregularly

Suchthatthegaseousmissions

Solidwastemanagementasper

from

these

equipment’s

are Therelevantmanagementrules

maintained

within

the

design Andhandoverthewasteto

specifications.

authorised

facilities,

Work

Provisionforinsulatingcapsand

SpecificPPE for safetyandbasic

Aidsattheexitofnoisesourceon

Amenitiestotheworkersonsite

Themachinery.

Shallbefollowedandreported

Theuseofdampeningmaterials

with

evidence

along

with

Suchasthinrubber/leadsheetfor

completion

certificate.

A

wrapping the workplaces

like Certificateinthisregardshallbe

compressors,generators,etc.

submitted by the empanelled

Inletandoutletmufflersshallbe

Certifiedexpert.

provided.

Earmuffs shall be provided to

Workersandenforcedtobe

Usedbytheworkers.

Noise prone activities shall be

Restrictedtotheextentpossible

Duringthenighttime,inorderto

have

minimum

environmental

Impactontheworkersaswellas

on theneighborhood.

General EC GeneralCondition2ofEC-The

Rule606:Legalen force ability for

EC Violations.

Conditions

Proponentshallincorporatepenal

Provisioninthe

Rule606.17maybereadfollows

byelaws/regulationsforany

Penalprovisionsforviolationof

Violationofenvironmentalissues.

Environmental

Conditions

will

The proponent shall also create lead

to

non

issuance

of

proper intuitional mechanism toOccupancycertificate.

ensure

continual

environmental

Awarenessamongallstakeholders.

NationalGreenTribunalConditions

Parameter

NGT Condition

ProposedAmendment

SolidWaste Conditionno. 5: All bulk generators

of municipal solid waste in the

proposedconstructions,both

residential

and

non-residential,

must necessarily segregate waste

at the source and process entire

biodegradable

waste

by

composting or bio-methanation

Withinthepremises.

Rule 606: Solid waste management by

bulk generators

Rule606.16maybereadfollowsBulk

generators(whogenerates100kgper

day)- commercial complex, institutions

andresidentialcomplex with 50 families

shall install suitable organic waste

processing systems to process it

within premises.

CFE conditions

Dual

Plumbing

system

Separate

meters

for

assessing

theusageof

water

for

domestic

andflushing

Condition no. 4: Dual Plumbing

system shall be adopted, and

separate tanks shall be provided to

store fresh water and treated waste

water.

Condition

no.6:

Separate

meterswithnecessarypipeline shall

be provided for assessing the

quantity

of

water

used

for

domesticandflushing purposes.

Rule 606: Dual plumbing system

Rule606.18maybereadfollows

In all residential buildings with 50

dwelling

units,

institutional

and

commercial projects dual plumbing

system for supply of fresh water and

treatedwastewatershallbearranged by

the developer along with separate

storage tanks. The developer shall

arrange dual plumbing system as per

NBC norms and CPHEEO Manual.

Rule606.18(i)mayberead follows

Flow meters shall be installed in the

dual plumbing system to assess the

usage of water for domestic and

flushing purposes.

Treatment

of

Sewage

toreuse

norms

Conditionno.8:

Onsite

sewage

treatment

systems shall ensure treatment

as per the latest CPHEEO

norms to meet the reuse norms

and the treated wastewater

shall be reused within the

premises.

Rule606.18(ii)maybereadfollows

All the STPs installed shall install

suitable

secondary

and

tertiary

treatment systems to meet the latest

CPHEEO reuse norms. The treated

wastewater

shall

be

reused

for

flushing,horticultureand

other

purposes within the premises.

Topsoil

preservation

Rule606:Topsoil preservation

Conditionno.20:Allthetop

Rule606.19maybereadfollows the

Soilexcavatedduring

Developershallpreservethetopsoil

Constructionactivitiesshould

Upto30cmdepthandreuseitfor

Bestoredforusein

Horticulturepurposes.Acertificate

Horticulture/landscape

Fromtheapplicantatthetimeof

Developmentwithintheproject

Submissionof applicanttobe

site

submitted.

Parking for Conditionno 49:

Conditionno 49:

visitor

Theproponentshallprovide

Theproponentshallprovidesufficient

vehicles

sufficient

parking space for Parkingspaceforvisitorvehicles.

Visitorvehicles.

Sd/-

Commissioner,

APCRDA.

ఆంऴధ ऴప޻ࢰ ࡌజ߄ߖ ǷాƔ ంత అࠚవృ޴म ǷాƔ ߅ڒర సంసब

ࡵߖߤ ࣊ంట࡛, గవరऒࡏ߮݋, ࢑జయ࢐డ – 520002

ߠܾࣆ

ࠀࡽ ߜంబ࡛: MAU61-DP0AMRV(OTH)/39/2025-DP:

APCRDA చటदం, 2014 ࣊ࣾߤ 39(1) మࡍ࠾ 41(3) నం޶ ܉ࡍ ۯࣄన అ߅ڒࡌల ऴపڒరం,

మࡍ࠾ APCRDA 45వ అޢࡍܾ ޓࡌघనం. 550/2025 Dt: 02.06.2025 ऴపڒరం,

ۀరవߗయ࠳న NGTړ సంబం߅ంۨ ڒङߧటࡽ ࣄܾ ࠑ ࡮࣒ చܼदలࡹ పࡌङవరణ

ړ ऱయࡓߤझ, CFE ࡅకए షరޔలߘ ۯరऐడం߯ ܔߖంۃ ߖబంధనలڕ సవరణల ڝసం

Ĭ‚Ɣ ɋś ߠܽ߸ښషߤ ऴప۪ࡍంచబݟం޴.

తదߘڷణంڴ, ఈ పࠉऱڡ ߠܾࣆߘ ऴప۪ࡍంۨన ޙ޵ ߘంݟ 30 ࡗ܌ల వङవ߅ࡹ

߮ࡖएనऒ

ߠܽ߸ښషߤ ڕ

సంబం߅ంۨ

అభङంతࡌࡱ/ࣇచనల

ڝసం

ఆࣔछߖంచబݟం޴. గݡ࢓ ޙ޵ࡹߩ ࣅछకࡍంۨన అభङంతࡌࡱ/ࣇచనࡱ పࡍࢣ࡯ంۨ

పࡍషएࡍంపబݞन࠼.

ڒ࢓న ڒߧటࡽ ࣄܾ ܔߖంۃ ࡓڷङࡶషߤझ-2016ړ, ۀరవߗయ࠳న NGTړ సంబం߅ంۨ,

పࡌङవరణ ړ ऱయࡓߤझ, CFE ࡅకए షరޔలߘ ఈ ڡࡍంద ߮ࡖएనऒ మࡍ࠾ ܔݟంۨన

࢑ధంڴ, ڒङߧటࡽ ࣄܾ ࠑ ࡮࣒ ࡹ ۯరऐడం߯ ऴపޒߦ޴త సవరణࡱ APCRDA చటदంࡹߖ

࣊ࣾߤ 41(4) ऴపڒరం ఈ ޙ޵ ߘంݟ అమࡱ ܑయబݟందߖ ߠܽ߸ښషߤ ܉ࡍ

ۯయబݟం޴.

࢑వర࠭ࡱ

పࡌङవరణ ړ ऱయࡓߤझ పࡍࣄबޒః

పࡍࠫޒ

పࡍࣄबޒ

అమࡌవޒ ڒङߧటࡽ ࣄܾ ܔߖంۃ

ࡓڷङࡶషనऱڕ ऴపޒߦ޴త సవరణ

ߗܽ ߖరछహణ

ఇࣄ

ࡅకए

షరޔ

6-

ऴపޒߦదڕݡ

వరलߩߗܽ

࣋కరణ

ߖࡌघހల

ߖࡌघހߖऒ

ߖࡌमࡍంۧ࡯

మࡍ࠾

ఆ

ߵࡌంతంࡹ

࠙ࡎ వࡌलలߘ పࡍగణనࡹړ

ࡐࡽ 606 (1) AP ࠉ࡯नంۃ ࡐࡽझ 2017 ޜ

సࡏभࠈܿ

ۯయంݟ.

ࡐࡽ 606 (1) ߘ ఈ ڡࡍం޴ ࢑ధంڴ

చదవవ۪ऐః

"1. జల వనࡏࡱ, ࡕࡶछࡱ, ࢑޶ङޠ

ࡷߘऱ,

࢑ࠪߕऴశయం,

చ࠭ࡏ/ڴङ࣒

ޓࣆڝవడం

޳छࡌ

వరलߩߗܽ ߖలछ మࡍ࠾

࢑ߖࡆగ

వङవసबߘ

ߵࡗతझࣕంۧ࡯.

APCRDA

& CA ࡅకए ఉప చܼदలࡹ

ۯరऐడం

޳छࡌ

ऴపޒߦదڕࡱ

࢒ܽߖ

తపओߖసࡍ ۯࣃफࡏ.

ౖ߯߭ऱߘऱ,

࢐రసతछ

ߖࡌघހࡱ,

మతపర࠳న ߖࡌघހࡱ మࡍ࠾ ఈఐఏ

ߠܽ߸ښషߤ

సࠬపంࡹ

అࠚవృ޴म

ڒరङక࡮ߦలߘ పࡍࠫతం ۯࣇफ ఎߗणܾ

܉ࡎ

ۯࣄన

అߖऒ

ऴపࣆफత

చܼदࡱ/ߖయࠪࡱ మࡍ࠾ ఆ޻ࢡࡱ

అߖऒ

ܔనऱࡹ

అߘసࡍంచబడޑ࠼,

ఉ޳హరణڕ

ఎ)

వరलߩߗܽ

࣋కరణ

ߖࡌघణం

࢑ߖࡆగం

మࡍ࠾

ߦऱ݋

పࡍࠪణంޜ సంబంధం ࡶڕంݞ అߖऒ

భవߕలڕ

అం޴ంచబݡޔం޴.

G.O.Ms.No.119, dt: 28/03/2017 మࡍ࠾

޳ߖ ఉప-త޶పࡍ సవరణల ޳छࡌ ܉ࡎ

ۯయబݟన AP ࠉ࡯नంۃ ࡐࡽझ, 2017 ߘ

۫డంݟ.

ࠉ) ఆంऴధऴప޻ࢰ ߗࡏ, ࠝࠫ మࡍ࠾

ۮటऱ చటदం, 2002 ࡹߖ ߖబంధనࡱ

వࡍफంۯ ۲ట అܿవంܽ ࣌ܿऱ మࡍ࠾

పథڒలࡹ ߦܽంచబడޑ࠼.

ࣄ)ࡌజ߄ߖ

నగరం

మࡍ࠾

AGC

ߵࡌంతంࡹ

అࠚవృ޴म

అߘమޒ

దరڣࣆफࡱ

IGBC/ECBC/GRIHA/EDGE

ߖబంధనలڕ

అߘڷణంڴ

ఉంݞ࡯,

ఇ޴

శړ फ

ࣃమరबङం,

వనࡏలߘ

స࠭ۨతంڴ

࢑ߖࡆڵం۪ڝవడంࡹ

సࣔయపݡޔం޴

మࡍ࠾

MAU61-

DP0AMRV(OTH)/39/2025-DP

I/4275324/2025 ࣄबర࠳న ߩనࡏޑओదక

శړ फߖ

ߵࡗతझࣕࣆफం޴.

޵ߖړ

సంబం߅ంۨ ఒక సࡍद߸ڙ݋ దరڣࣆफ

సమరओణ సమయంࡹ సࡍदࠀݭ ߖߩރݟ

ߘంݟ

అ߅ڒࡌߖړ

సమࡍओంచబݡޔం޴.

d)

200

చదరߩ

ࠬటࡏऱ

మࡍ࠾

అంతకం݄ ఎڕएవ వరलߦతం ఉనऒ

ߦऱ݋ ࡹߖ

అߖऒ

ߖ࢐స,

࢐ށజङ,

సంࣃबగత

అࠚవృ޴म.

ߩనࡍछߖࡆగం

ڝసం

ߗܽ

ߖలछ

ܼङంڕࡱ.

G.O.Ms.No.119,

dt:28/03/2017

޳छࡌ

܉ࡎ ۯయబݟన AP భవన ߖయࠪࡱ,

2017

మࡍ࠾

޳ߖ

త޶పࡍ

సవరణలߘ ۫డంݟ.

ࡗ܌ڕ కߗసం 15,000 ࡰటࡏऱ మࡍ࠾

అంతకం݄ ఎڕएవ ߗܽߖ ࢑ݡదల ۯ࣋

అߖऒ

భవߕࡱ

ࡶ޳

25

ߖ࢐స

࠿ߖܿऱ మࡍ࠾ అంతకం݄ ఎڕएవ

ఉనऒ ߵࡌంగހࡱ వङరब జ࡮ల ࡎ࣌ړ ऱంۃ

వङవసबߘ క࡯ڵ ఉంݞ࡯. ࡎ࣌ړࡽ ۯࣄన

ߗܽߖ ఉ޳ङనవన ऴపࡆజߕల ڝసం

మࡍ࠾

ఫऱࢳంۃ

ऴపࡆజߕల

ڝసం

ఉపࡆڵంۧ࡯. ޵ߖړ సంబం߅ంۨ ఒక

సࡍद߸ڙ݋ ߘ

ఎంߦङߜࡽन

సࡍदࠀݭ

ߖߩރݡ సమࡍओంۧ࡯.

EC ࡅకए 8వ ߖబంధన -

ऴపޒߦదڕݡ

తڕएవ

ऴప࢐హ

పऱంࠉంۃ ߘ

ߵࡗతझࣕంۧ࡯

సమరबవంత࠳న ߸కऐ࡛ ࡱ,

࣊ߕझࡏऱ, ఆ݇

࢐ࡽ࢟ ࡱ, ߨడߕߖऒ తڵ ठంۯ

పࡍకࡌࡱ

ܼ࠼ࡵ݋ ࡱ,

ڕࡿ࠼ࡱ

ఎࡔటࡏऱ

మࡍ࠾

ߗܽߖ

సంరऀంచݞߖړ

షవ࡛

ࣛݭ ࡱ

ఇ࢑.

ऴపޒߦదڕݡ

ఈ

ࠪరठదరजڒలߘ ࠑ࡮࣒ ࡹ

ۯࡌऐ࡯.

ߖయమం 606 (2) ڕ ܔݟం۪: NBC

మࡍ࠾ AP భవన ߖయࠪలޜ సమघޒ

ߖయమం 606 (2) ߖ ఇ࡮ చదవవ۪ऐ

“2. ఈ ߖబంధనలࡹ ۯరऐబడߖ భవనం

ఆవశङకతࡱ మࡍ࠾ ऴపࠪހࡱ

ఆంऴధ ऴప޻ࢰ భవన ߖయࠪࡱ, 2017

޳छࡌ ߖరछࣕంచబడޑ࠼

మࡍ࠾ ܉ޓయ భవన ߖయࠪవࢀړ

అߘڷణంڴ ఉంݞ࡯.

“3. ݥవలప࡛ ࢐ࣁ ࠐࣄߤ ڕࡿ࠼ࡱ,

ࠈޠ మࡍ࠾ ఇతర ڕࡿ࠼ࡱ, షవ࡛

ࣛݭ ࡱ

࠴దࡷన

࢐ܽࡹ

తڕएవ

ऴప࢐హ

పऱంࠉంۃ

సమరबవంత࠳న

߸కऐ࡛ ࡱ, ࣊ߕझ࡛ ࡱ, ߨడనం తڵ ठంۯ࢑

ࣃबߧంۧ࡯. ఈ ࢑షయంࡹ సࡍद߸ڙ݋ ߘ

ఎంߦङߜࡽन

సࡍदࠀݭ

ߖߩރݡ

సమࡍओంۧ࡯.

ڴ࡯ & శړ फ

EC ࡅకए షరޔ 11 -

ऴపޒߦదڕݡ DG ࣊݋ ࡱ

MoEF

&

CC

޳छࡌ

పࡌङవరణం

(రࣾణ)

ߖయࠪలࡹ

ࣇۨంచబݟన

శబभం

మࡍ࠾

ఉ޳ठర

ߖబంధనలڕ అߘڷణంڴ

ఉంݦ࡮ ۫ࣆڝ࢐࡯.

ߖయమం 606: EP ߖబంధనల ऴపڒరం

MoEFCC

ߖబంధనలڕ

కܿदబݟ

ఉండటం

ఇߕएࡖओࡔషߤ

ߖయమం

606.10ߖ ఈ ڡࡍం޴ ࢑ధంڴ చదవవ۪ऐ

“DG

࣊݋ ࡱ

ఇߤ ࣃदࡽ

ۯయబݟన࢑

పࡌङవరణంࡹ (రࣾణ) ߖయࠪࡱ

ࡹ MoEF & CC ࣇۨంۨన శబभం

మࡍ࠾

ఉ޳ठర

ߖబంధనలڕ

అߘڷణంڴ

ఉంݞ࡯.

OC

ڝసం

దరڣࣆफ ۯࣆफనऒߩओݡ GoI ࡅకए

అ߆కృత ఏܐߗझలۯ ఆ࠵޴ంచబݟన

DG ࣊݋ లߘ సమࡍओంۧ࡯.

EC ࡅకए షరޔ 13 -

ऴపޒߦదڕݡ

అߖऒ

భవߕల

޳छࡌ

࣏ర

ߖయమం 606: EP ߖబంధనల ऴపڒరం

MoEFCC

ߖబంధనలڕ

కܿदబݟ

ఉండటం

ఫలڒలߘ

ఏࡌओܿ

ۯ࠻లߖ

ߖࡌमࡍం۪ڝ࢐࡯, ޵ߖ ڝసం

߯కߩओ ߯࠙గంࡹ కߗసం

1/3 వంޔ ښܼ࠼ంۧ࡯.

ఇ޴

࣏ర

ࣖటరऱ

సంࣃबపనڕ

అదనంڴ

ఉంܿం޴.

ऴపޒߦదڕݡ

ఈ ࠪరठదరजڒలߘ ఉప-

చܼदలࡹ ۯࡌऐ࡯.

ఇߕएࡖओࡔషߤ ߖయమం 606.11ߖ ఈ

ڡࡍం޴ ࢑ధంڴ చదవవ۪ऐ

“࣎࡮࡛

ࣖటరऱ

సంࣃबపనޜ

ߦܿ

భవߕల

߯కߩओࡹ

కߗసం

1/3

వంޔ

ښܼ࠼ంచడం ޳छࡌ ݥవలప࡛ ࣏ర

ߦङߜࡽ లߘ ఇߤ ࣃदࡽ ۯ࠻࡯” అߝ޴

300

చదరߩ

ࠬటరऱ

కం݄

తڕएవ

࢑ࣅफరपంࡹ ఉనऒ వङړ फగత ߖ࢐స భవߕࡱ

తపओ అߖऒ భవߕలڕ తపओߖసࡍ.

EC ࡅకए షరޔ 14 –

ऴపޒߦదڕݡ శړ फ ࣃమరबङ

ࠪరठదరजڒలߘ

(శړ फ

పࡍరࣾణ

ߖࡌघణ

ڝݭ)

ۯࡌऐ࡯. అߖऒ ࠮లధన

స࠭޳࠻ࡱ,

࢐ށజङ,

సంࣃबగత మࡍ࠾ ऴప߄న

ߖ࢐స స࠭޳࠻ࡱ ۃࡎߤ

భవన

࠙వనలߘ

అߘసࡍంۨ

ߖࡍघంۧ࡯

మࡍ࠾

శړ फ

ࣃమరबङం,

తڕएవ ڒరखߤ ߦద࠭ऴద,

వనࡏల

పࡍరࣾణ

࠴దࡷన

࢐ܽߖ

ߖࡌमࡍంۧ࡯. ऴపޒߦదڕݡ

శړ फ

ࡅకए

అߖऒ

߭దभ

࢑ߖࡆగ޳ࡏࡱ

ߩనࡏޑओదక

శړ फ

޳छࡌ

࢐ࡍ

ݟࠪంݭ ࡹ

ఎڕएవ

࠙ڴߖऒ ޓࡌऐలߖ మࡍ࠾

ࢢ࡮జ ఇంధߕల ࢐డڒߖऒ

ߖ࢐ࡍంۧలߖ

ߖࡌमࡍం۪ڝ࢐࡯;

ऴపޒߦదڕݡ ࢒ܽߖ ఉప-

చܼदలࡹ ۯࡌऐ࡯.

ߖయమం 606(1) ࡹ ऴపޒߦ޴ంచబݟన

సవరణ మࡍ࠾ ఈ ڡࡍం޴ ࢑ధంڴ

చదవబݟం޴

“CC

మࡍ࠾

AGC

ߵࡌంతంࡹߖ

అࠚవృ޴म

అߘమޒ

దరڣࣆफࡱ

IGBC/ECBC/GRIHA/EDGE

ߖ

ߦܽంۧ࡯

ఇ޴

శړ फ

ࣃమరबङం,

వనࡏల ࡅకए ࢐ంఛߗయ ࢑ߖࡆగం

మࡍ࠾ ࣄबర࠳న ߩనࡏޑओదక శړ फߖ

ߵࡗతझࣕంచడంࡹ సࣔయపݡޔం޴.

భవన ߖࡌघణ అߘమޒߖ ఆ࠵޴ంۯ

సమయంࡹ ధృ࢒కࡍంచబݟన ߖߩރݟ

ߘంݟ ఈ ࢑షయంࡹ ఒక

సࡍद߸ڙ݋ ߘ అ߅ڒࡌߖړ సమࡍओంۧ࡯.”

ఘన వङࡌबࡱ

EC

ࡅకए

షరޔ

20

ऴపޒߦదڕݡ ߾ౖऱ ࠻ࣁ ߘ

ఉపࡆڵంۧలߖ

ߖࡌमࡍం۪ڝ࢐࡯.

ߖࡌघణ

ऴపࡆజߕల

ڝసం

߾ౖऱ

࠻ࣁ

ఇܿకࡱ,

PPC

ࣄ࠱ం݋,

ڒంڡࡎ݋

࠴దࡷన

࢐ܽޜ

సࣔ

ߖయమం

606:

MoEF

߾ౖऱ

࠻ࣁ

ߠܽ߸ښషߤ లڕ అߘڷణంڴ ߖࡌघణం.

ఈ ࢑షయంࡹ దరڣࣆफ޳ࡏݡ OC

సమయంࡹ

దరڣࣆफ޳ࡏݡ

޵ߖړ

సంబం߅ంۨన

సࡍद߸ڙ݋ ߘ

సమࡍओంۧ࡯.

ࡹతܿद ߵࡌంޑࡱ, ࡗݡन

కటदలߘ సమం ۯయడం /

ߩనࡏదमࡍంచడం, వరదࡱ

పݟన

ߵࡌంޑలࡹ

ߦऱ݋ ߷ర࠹ లߘ ߭ంచడం

మࡍ࠾ ߾ౖऱ ࠻ࣁ ఆ߄ࡍత

ఉతओޔफలߘ

ఉపࡆڵంచడం వంܽ࢑ ߾ౖऱ

࠻ࣁ ڕ

అߘڷణంڴ

ఉంݞ࡯.

పࡌङవరణం

(రࣾణ) చటदం ړంద MoEF

܉ࡎ

ۯࣄన

ߠܽ߸ښషߤ.

ऴపޒߦదڕݡ

ߖࡌघణ

సంసबࡱ ࠑ-చܼदలࡹ ߾ౖऱ

࠻ࣁ ࢐డڒߖऒ ۯࡌऐ࡯.

܋࢐వరణ ࢡवసफం

& ࢐రసతछం

EC ࡅకए షరޔ 13 -

అమࡌవޒ ࡌజ߄ߖ నగరం

మࡍ࠾ ۪ܿदపకएల ఉనऒ

అߖऒ

ߩࡌవࣆफ,

ࣃంసएృޒక

మࡍ࠾

పࡌङవరణపరంڴ

ࣆߖऒత࠳న

ߵࡌంޑࡱ

(అనڴ న޵࠭ఖ޳छࡌࡱ,

మడ

అడ࢓ࡱ,

ࡌޒ

ޓࡌࡱ,

ڷహࡱ

࠴దࡷన࢑)

తڵనంతڴ

రऀంచబݟ

సంరऀంచబݞ࡯.

ఉండవ࡯ऱ

ڷహల

రࣾణ

ڝసం ऴపޒߦదڕݡ తڵన

చరङࡱ

ޓࣆڝ࢐࡯.

ASI

ߖబంధనల

ऴపڒరం

ఉండవ࡯ऱ

ڷహల

۪݀द

100

ߘంݟ

300

ࠬటరऱ

వరڕ

అࠚవృ޴म

ڒరङక࡮ߦࡱ ࡶߖ ܔߤ ڴ

ऴపޒߦదڕݡ ऴపకܽంۧ࡯.

ߖయమం 606: ASI ߠܽ߸ښషߤ

AMASR చటदం ړంద సమघޒ

࢑ࡰన ߖయమం 606.13 ߘ ఈ ڡࡍం޴

࢑ధంڴ చదవవ۪ऐ

ߩࡌతన

ࣃघరక

ۨࣔऒࡱ

మࡍ࠾

ߩࡌవࣆफ ऴప޻ࢡࡱ మࡍ࠾ అవࢩࢲࡱ

చటदం, 1958 ڕ ࢑ࡏదमంڴ ఎܿవంܽ

అࠚవృ޴म ڒరङక࡮ߦࡱ జరగږడ޶.

EC ࡅకए షరޔ 15 & 26 -

ۃࡎߤ ࠏࡱदల అࠚవృ޴म,

ۃࡎߤ ڒࡍݞࡏऱ, అࢗߙङ

ߦऱం݄షߘऱ

࠴దࡷన࢑

బࣗళ ఉపࡆڴࡱ క࡯ڵన

ࣃबߖక ܉ޔలޜ ࠪऴత࠲

ߖయమం 606: ޜటల ߭ంపకం

పచऐదనం߯ APCRDA సలࣔ కܾࠫ

ࠪరठదరजڒల ऴపڒరం లࣾހࡱ

ఇߕएࡖओࡔషߤ ߖయమం 606.14 ߘ ఈ

ڡࡍం޴

࢑ధంڴ

చదవవ۪ऐ

“పచऐదనం߯ APCRDA సలࣔ కܾࠫ

ۯ࠻࡯ మࡍ࠾

ߕటకం

ࣃबߖక ܉ޔల ࢙࢑߄ङߖऒ

ऴప࠙࢑తం

ۯయږడ޶

మࡍ࠾

ڒరखߤ

ߖలछలߘ

߭ంచݞߖړ

సࣔయపݡޔం޴

ࡗడऱ

పకएన

మࡍ࠾

బࣕరంగ ऴప޻ࢡలࡹ

ࡹޔ

ߦޔڕ߱࠼న

߭దभ ఆڕలߘ ߕటడం

࢐࠾ ڒࡱషङ ڒరڒలߘ

ࣄంڡ ࡱڴ

పߖۯ࣋࡮

అࠚవృ޴म ۯ࠻࡯.

ࠪరठదరजڒల

ऴపڒరం

ݥవలపࡏऱ

బࣕరంగ ऴప޻ࢡలࡹ ࣃबߖక మࡍ࠾

ࡹޔڴ

ߦޔڕ߱࠼న

ۮటऱޜ

పచऐదߕߖऒ అࠚవృ޴म ۯ࠻࡯.

࢑పޔफ

ߖరछహణ

EC

ࡅకए

షరޔ

2

-

ऴపޒߦదڕݡ

నగరం

ࡅకए

ࣃबనం

( ڒऱ࣒

III

ࠝకంప

ܔߤ)

ߘ

పࡍగణనࡹړ

ޓࣆڜߖ

ࠝకంప

ऴపޒసओందన

ߖరछహణ ऴపހࢀకߘ ࣄదमం

ۯ࠻࡯.

ऴపޒߦదڕݡ

ఉప-చܼदలࡹ (࣌ࣄघڡ ܔߤ

III)

భవߕల

ߖࡌघణ

ࡐపకలओన

అవసࡌలߘ

ۯࡌऐ࡯.

ߖయమం 606: ࡌజ߄ߖ నగర ܔߤ ߘ

ࠝకంప ߖࡗధక ܔߤ IIIڴ పࡍగށంచడం

ߖࡌघణ ࢑ࢩऱషణ.

ߖయమం 606.4ߖ ఇ࡮ చదవవ۪ऐ

“భవనం మࡍ࠾ ߖࡌघހࡱ ࠝకంప

ߖࡗధకతڕ

అߘڷణంڴ

ࡐ߰ం޴ంచబݞ࡯

ࡌజ߄ߖ నగࡌߖऒ ࠝకంప ߖࡗధక ܔߤ

III మࡍ࠾ ڴ࡯ ࠙రంڴ పࡍగށంۧ࡯.

ߖࡌघణ ఇంజߗ࡛ ఇۨऐన ߖࡌघణ ࣄबరతछ

ధృ࢒కరణ పऴతం భవߕలߘ ࠝకంపం

మࡍ࠾ ڴ࡯ ࠙ࡌలڕ ߖࡗధకతߘ

క࡯ڵ

ఉంݦ࡮

ۯయݞߖړ

భవߕల

ࡐపకలओన

మࡍ࠾

ߖࡌघణంࡹ

ߖబంధనలߘ ߦܽంۧరߖ ߮ࡖएߕ࡯

(వࡍफంۯ ߖࡌघހల ࢑షయంࡹ)”.

ߖࡌघణం

దశ

ߖయంऴతణࡱ

EC ࡅకए షరޔ 2 -

ऴపޒߦదڕݡ ߖࡌघణ

దశࡹ ڒࡱషङ సమసङలߘ

తڵ ठంచݞߖړ కܿदబݟ ఉనऒ

࢑ధంڴ ړం޴ ఉపశమన

చరङలߘ ߖࡌमࡍంۧ࡯.

߮రऐబݟన ࡶ޳ ర࢐ހ

ۯయబݟన అߖऒ వ޶ࡱڴ

ఉనऒ ప޳ࡌबలڕ

ܼࡌओ࡯ߘऱ వంܽ తڵన

కవࡍంۃ అం޴ంۧ࡯.

ߖయమం 606:

పࡌङవరణ ߖరछహణ

చరङࡱ

ߖయమం 606.15 ߖ ఇ࡮ చదవవ۪ऐ

ߖࡌघణ దశࡹ ڒࡱࢲङߖऒ ݥవలప࡛

తڵ ठంۧ࡯

߈ࢀ అణۨ࢘త మࡍ࠾

ప࡮యన ఉ޳ठర ߖయంऴతణ

చరङࡱ, శబभ ߖయంऴతణ.

అడनంڕలߘ ఉపࡆڵంۨ చరङࡱ,

మఫऱࡏऱ, ߗܽ ڒࡱషङ ߖయంऴతణ

ޑޑए࡯క ࠭ࡏڷߗܽ ࢤ޴म ڝసం STP

లߘ ఏࡌओܿ ۯయడం ޳छࡌ చరङࡱ

޶࠭घ

ఉతओޒफ

అࡃङ

అవڒశం ఉనऒ ऴప޻శంࡹ

ߗܽߖ చ࡮ऱ࡯.

ఈ పࡍకࡌల ߘంݟ ࢐࠾

ఉ޳ठࡌࡱ

ݟܒߤ

࣊ओࣄ߸ښషనऱࡹ

ߖరछࣕంచబݦ࡮

ߖࡌघణ

పࡍకࡌలߘ

ऴకమం

తపओڕంݞ

ߖరछࣕంۧ࡯

మࡍ࠾ సࡎछ࣒ ۯ࠻࡯.

యంޠࡌల߯ ఇߘझࡶܽంۃ

ڒङߵ ࡱ

మࡍ࠾

శబभ

࠮లం ߘంݟ ߖऴషएమణ

వదभ సࣔ࠻ࡱ.

కంߵࡓస࡛ ࡱ,

జనࡔట࡛

࠴దࡷన పߖ ऴప޻ࢡలߘ

۪టदݞߖړ సనऒߖ రబखࡏ /

ࣅసం ࢴ݋ వంܽ డంߧంۃ

ప޳ࡌबలߘ

ఉపࡆڵంచడం.

ఇߤ ࡵ݋

మࡍ࠾

అ࢓݋ ࡵ݋

మఫऱ࡛ లߘ

అం޴ంۧ࡯.

ఇయ࡛ మࠆ ࡱ ڒࡍघڕలڕ

అం޴ంۧ࡯

మࡍ࠾

ڒࡍघڕࡱ

࢐ܽߖ

ఉపࡆڵం۪ڕߝ࡮

ۯ࠻࡯.

ࡌޠࡍ

సమయంࡹ

శబभం

క࡯ڵంۯ

ڒరङక࡮ߦలߘ

ࣃధङ࠳నంత

వరڕ

పࡍࠫతం ۯ࠻࡯, ޵ߖవలऱ

ڒࡍघڕల߯

మࡍ࠾

߰ࡏڷ࢐ࡍ߯

పࡌङవరణ

ऴప࠙వం

తڕएవڴ

ఉంܿం޴.

ڒࡍघక ࢢࠉరం మࡍ࠾ ࠋరద ߘంݟ

అ߆కృత ࣏కరङం వదभ ߦర࢘యడం,

సంబం߅త ߖరछహణ ߖయࠪల ऴపڒరం

ఘన వङࡌबల ߖరछహణ

మࡍ࠾ ߗܽߖ అ߆కృత ࣏కࡌङలڕ

అపओڵంచడం, భऴదత మࡍ࠾ ࣌݋ ࡹߖ

ڒࡍघڕలڕ ߵࡌథࠫక ࣏కࡌङల ڝసం

పߖ-ߖ ࡍभషद PPE

అߘసࡍంۨ, ߪࡍफ ۯࣄన ధృ࢒కరణ

పऴతంޜ ߦܿ ఆ߄ࡌలޜ ߖ࢘޴ంۧ࡯.

޵ߖړ సంబం߅ంۨ ఒక

సࡍद߸ڙ݋ ߘ ఎంߦߜࡽन

సࡍदࠀݭ ߖߩރݡ సమࡍओంۧ࡯.

జనరࡽ EC

షరޔࡱ

EC ࡅకए ࣃ߄రణ షరޔ

2 - పࡌङవరణ సమసङల

ఉలऱంఘనڕ ऴపޒߦదڕݡ

ఉప-చܼदࡱ/ߖబంధనలࡹ

ࢢࣿ ߖబంధనߘ ۯࡌऐ࡯.

అߖऒ

࢐ܼ޳ࡏలࡹ

ߖరంతర

పࡌङవరణ

అవڴహనߘ

ߖࡌमࡍంచݞߖړ

ऴపޒߦదڕݡ

సࡕన

అంత࡛

దృࢳद

యంޠࡌంڴߖऒ

ږݞ

సృࢳदంۧ࡯.

ߖయమం

606:

EC

వࡆࡶషనऱڕ

చటदపర࠳న అమࡱ ࣃమరबङం

ߖయమం 606.17 ߘ ڡࡍం޴ ࢑ధంڴ

చదవవ۪ऐ

పࡌङవరణ

పࡍࣄबޔలߘ

ఉలऱంۆంۨనం޶ڕ ࢢࣿ ߖబంధనࡱ

ఆڕङ߭ߗझ

సࡍद߸ښ݋

܉ࡎ

ۯయబడక߱వݞߖړ ޳ࡍޓࣆफం޴.

ߝషనࡽ ۃࡎߤ ݋ࡍࠋङనࡽ షరޔࡱ

పࡌࠫޒ

NGT షరޔ

ऴపޒߦ޴త సవరణ

ఘన వङࡌबࡱ

షరޔ సంఖङ 5: ऴపޒߦ޴త

ߖࡌघހలࡹߖ అߖऒ బࡽए

࠭ߖझపࡽ ఘన వङ ࡌबల

జనࡔటࡏऱ, ߖ࢐స మࡍ࠾

ߖ࢐࣋తర ߖࡌघހࡱ,

తపओߖసࡍڴ వङࡌबలߘ

࠮లం వ޻भ ࢘ࡏ ۯࣄ,

ߵࡌంగణంࡹ కం߱ࣄदంۃ

ࡶ޳ బࡆ-ࠬథߝషߤ

޳छࡌ ࠴తफం

బࡆݟۃࡔడࠋࡽ

వङࡌबలߘ ߵࡌ࣒࣊

ۯ࠻࡯.

ߖయమం 606: ఘన వङࡌबల ߖరछహణ

బࡽए జనࡔటరऱ ޳छࡌ

ߖయమం 606.16 ߖ ఇ࡮ చదవవ۪ऐ

బࡽए జనࡔటࡏऱ (ࡗ܌ڕ 100 ړࡹల

ఉతओޒफ ۯ࣋࢑) - ࢐ށజङ స࠭޳࠻ࡱ,

సంసबࡱ మࡍ࠾ ߖ࢐స స࠭޳࠻ࡱ

50 ڕܿంࠈࡱ ߵࡌంగణంࡹ ߵࡌ࣒࣊

ۯయݞߖړ తڵన ࣋ం߂ࡎయ వङࡌबల

ߵࡌ࣊ࣄంۃ వङవసबలߘ ఏࡌओܿ

ۯ࠻࡯.

CFE షరޔࡱ

ݢङయࡽ

పऱంࠉంۃ వङవసब

షరޔ సంఖङ 4: ݢङయࡽ

పऱంࠉంۃ వङవసबߘ

అవలంࠉంۧ࡯ మࡍ࠾

మంۨߗܽߖ ߖలछ

ۯయݞߖړ మࡍ࠾ ࢤ޴म

ۯࣄన వङరब జ࡮లߘ ߖలछ

ۯయݞߖړ ऴపޙङక

ܼङంڕࡱ అం޴ంۧ࡯.

ߖయమం 606: దछందछ పऱంࠉంۃ వङవసब

ߖయమం 606.18ߖ ఇ࡮ చదవవ۪ऐ

50 ߖ࢐స ࠿ߖܿऱ, సంࣃबగత మࡍ࠾

࢐ށజङ ߵࡌܐڕदࡱ క࡯ڵన అߖऒ ߖ࢐స

భవߕలࡹ దछందछ పऱంࠉంۃ

మంۨߗࡏ మࡍ࠾ ࢤ޴म ۯࣄన వङరब

జ࡮ల సరఫࡌ ڝసం వङవసबߘ ݥవలప࡛

ऴపޙङక ߖలछ ܼङంڕలޜ ߦܿ ఏࡌओܿ

ۯ࠻࡯. ݥవలప࡛ NBC ߖబంధనࡱ

మࡍ࠾ CPHEEO ࠪߘङవࡽ ऴపڒరం

గృహ ߗܽ

࢑ߖࡆڴߖऒ

అంచߕ

࢘యݞߖړ

మࡍ࠾ ఫऱࢳంۃ

ڝసం ऴపޙङక

ࠬటࡏऱ

࠭ࡏڷߗܽ ࢤ޴म

ߩనࡍछߖࡆగం

ߖబంధనࡱ

ܼߵ ߝల

సంరࣾణ

షరޔ ߜం.6: గృహ మࡍ࠾

ఫऱࢳంۃ ऴపࡆజߕల ڝసం

ఉపࡆڵంۯ ߗܽ

పࡍࠪހߖऒ అంచߕ

࢘యݞߖړ అవసర࠳న

߯ߵ ࡷߤ ޜ ऴపޙङక ࠬటࡏऱ

అం޴ంచబడޑ࠼.

షరޔ సంఖङ 8:

ఆߤ ࣌݋ ࠭ࡏڷߗܽ ࢤ޴म

వङవసबࡱ ߩనࡍछߖࡆగ

ߖబంధనలڕ అߘڷణంڴ

ޑ܉ CPHEEO ߖబంధనల

ऴపڒరం ࢤ޴मߖ ߖࡌमࡍంۧ࡯

మࡍ࠾ ࢤ޴म ۯయబݟన

వङరब జ࡮లߘ

ߵࡌంగణంࡹߝ ޒࡍڵ

ఉపࡆڵంۧ࡯.

షరޔ సంఖङ 20: ߖࡌघణ

ڒరङక࡮ߦల సమయంࡹ

త࢑छన అߖऒ ߯ మܽदߖ

ߵࡌܐڡ द ࣌݋ ࡹߖ

ఉ޳ङనవన/ऴపకృޒ దృశङం

అࠚవృ޴मࡹ

ఉపࡆڵంచݞߖړ ߖలछ

ۯ࠻࡯.

దछందछ పऱంࠉంۃ వङవసबߘ ఏࡌओܿ

ۯ࠻࡯.

ߖయమం 606.18 (i) ߖ ఇ࡮ చదవవ۪ऐ

గృహ మࡍ࠾ ఫऱࢳంۃ ऴపࡆజߕల

ڝసం ߗܽ ࢑ߖࡆڴߖऒ అంచߕ

࢘యݞߖړ

దछందछ పऱంࠉంۃ వङవసबࡹ ࠂऱ ࠬటరऱߘ

ఏࡌओܿ ۯ࠻࡯.

ߖయమం 606.18 (ii) ߖ ఇ࡮ చదవవ۪ऐ

ࣃबߧంచబݟన అߖऒ STPࡱ ޑ܉

CPHEEO ߩనࡍछߖࡆగ ߖబంధనలڕ

అߘڷణంڴ తڵన ޴छޓయ మࡍ࠾

తృޓయ ࢤ޴म వङవసबలߘ ఏࡌओܿ

ۯ࠻࡯. ࢤ޴म ۯయబݟన

వङరब ߗܽߖ ߵࡌంగణంࡹ ఫऱࢳంۃ,

ఉ޳ङనవనం మࡍ࠾ ఇతర

ऴపࡆజߕల ڝసం ޒࡍڵ

ఉపࡆڵంۧ࡯.

ߖయమం 606: ߯న ߝల సంరࣾణ

ߖయమం 606.19 ߖ ఈ ڡࡍం޴ ࢑ధంڴ

చదవవ۪ऐ

ݥవలప࡛ ߯ మܽदߖ 30 ࣊ం.ࠬ ࡹޔ

వరڕ సంరऀంۨ, ޜటపߖ ऴపࡆజߕల

ڝసం ޒࡍڵ ఉపࡆڵం۪ڝ࢐࡯.

దరڣࣆफ޳ࡏ సమࡍओంۨన సమయంࡹ

దరڣࣆफ޳ࡏ ߘంݟ ఒక సࡍद߸ښ݋

సమࡍओంۧ࡯.

సందరजڕల

࢐హߕల

ߦࡍएంۃ

షరޔ సంఖङ 49:

ऴపޒߦదڕݡ సందరजڕల

࢐హߕలڕ తڵనంత

ߦࡍएంۃ సब࡮ߖऒ

అం޴ంۧ࡯.

షరޔ సంఖङ 49:

ऴపޒߦదڕݡ సందరजڕల ࢐హߕలڕ

తڵనంత ߦࡍएంۃ సब࡮ߖऒ అం޴ంۧ࡯.

Sd/-

కࠬషన࡛,

ఏ.ߧ.ࣄ.ఆ࡛.ݟ.ఏ.