The 16th February, 2026
APSERC (Deviation Settlement Mechanism and Related Matters) Regulations, 2026
No. APSERC/Notification/55/2026.— In exercise of the powers conferred under sub-section (3) of
Section 32, sub-section (4) of Section 33, sub-section (1) of Section 86 and Section 181 of the Electricity
Act, 2003 (36 of 2003), and all other powers enabling it in this behalf and after previous publication, the
Arunachal Pradesh State Electricity Regulatory Commission hereby makes the following regulations, namely
Arunachal Pradesh State Electricity Regulatory Commission (Deviation Settlement Mechanism and
Related Matters) Regulations, 2026.
1.
Short title and commencement :
(i)
These Regulations may be called the Arunachal Pradesh State Electricity Regulatory
Commission (Deviation Settlement Mechanism and Related Matters) Regulations, 2026.
(ii)
These Regulations shall apply to all Intra-State Entities in Arunachal Pradesh State in a manner
as specified in these Regulations.
(iii)
These Regulations except commercial arrangements, Deviation Charges and penal action shall
come into force from the date of Notification in Official Gazette of Arunachal Pradesh.
2.
Objective :
These regulations seek to ensure, through a commercial mechanism, that grid users do not
deviate from and adhere to their schedule of drawal and injection of electricity in the interest of
security and stability of the grid.
3.
Definitions and Interpretation :
In these regulations, unless the context otherwise requires:
(a)
‘Act’ means the Electricity Act, 2003 (36 of 2003);
(b)
‘Actual drawal’ in a time block means the electricity drawn by a buyer, measured by the
interface meters;
(c)
‘Actual injection’ in a time block means the electricity injected by the seller, measured by the
interface meters;
(d)
‘Ancillary Services’ means the Ancillary Services as defined in the Ancillary Services
Regulations notified by CERC;
(e)
‘Area Clearing Price’ or ‘ACP’ means the price of electricity contract for a time-block
transacted on a Power Exchanges after considering all valid buy and sale bids in particular
area(s) after market-splitting;
(f)
‘Available Capacity’ for generating station based on wind or solar or hybrid of wind- solar
resources which are State entities, is the cumulative capacity rating of wind turbines or solar
inverters that are capable of generating power in a given time block and shall be limited to the
quantum of connectivity granted;
(g)
‘Buyer’ means a person purchasing electricity through a transaction scheduled in accordance
with the APSERC State Grid Code (APSEGC);
(h)
‘Central Commission’ means the Central Electricity Regulatory Commission referred to in
sub-section (1) of Section 76 of the Act;
(i)
‘Commission’ means the Arunachal Pradesh State Electricity Regulatory Commission referred
to in sub- section (1) of Section 82 of the Act;
2
The Arunachal Pradesh Extraordinary Gazette, March 16, 2026
(j)
‘Connectivity Regulations’ means the provisions of State Grid Code as amended from time to
time and APSERC (Terms and Conditions of Intra-State Open Access) Regulation, 2026 as
amended from time to time.
(k)
‘Contract rate’ means (i) in respect of a WS seller or a MSW Seller or such other entity as
applicable, whose tariff is determined or adopted or approved under Section 62 or Section 63 or
Section 86 (1) (b) of the Act, in Rs/kWh as determined or adopted or approved by the
Commission; or
(ii)
in respect of a WS seller or a MSW Seller or such other entity as applicable, whose
tariff is not determined or adopted or approved under Section 62 or Section 63 or
Section 86 (1) (b) of the Act, and selling power through power exchange(s), the price as
discovered in the Power Exchanges for the respective transaction; or
(iii)
in respect of a WS seller or a MSW seller or such other entity as applicable, selling power
through open access to a third party or in case of captive consumption of a captive
generating plant based on renewable energy sources the weighted average ACP of the
Integrated- Day Ahead Market segments of all Power Exchanges for the respective time
block; or
(iv)
in case of multiple contracts or transactions including captive consumption, the weighted
average of the contract rates of all such contracts or transactions, as the case may be;
(l)
‘Day Ahead Market (DAM)’ means a market where physical delivery of electricity occurs on the
next day (T+1) of the date of transaction (T) and is governed by the Central Electricity
Regulatory Commission (Power Market) Regulations, 2022 (as amended from time to time), the
Rules and Bye-Laws of the Power Exchanges as approved by the Central Commission.
(m)
‘Deviation’ in a time block for a seller of electricity means its total actual injection minus its total
scheduled generation; and for a buyer of electricity means its total actual drawal minus its total
scheduled drawal in that time block and shall be computed as per Regulation 7 of these
regulations;
(n)
‘Deviation Rate or Deviation Charge’ shall mean the charges for deviation for applicable time
block as stipulated under the Regulation 9 of these Regulations.
(o)
‘Full Open Access Consumer’ shall mean Open Access Consumer connected to a
transmission system or distribution system but not having any contract demand with the
distribution licensee within the state.
(p)
‘Gaming’ in relation to these Regulations, shall mean an intentional mis-declaration of declared
capacity by any Seller or intentional mis-declaration of drawal schedule by any Buyer in order to
make an undue commercial gain through Charge for Deviations;
(q)
‘General seller’ means a seller in case of a generating station based on other than wind or
solar or hybrid of wind-solar resources;
(r)
‘Grid Code’ means APSERC (State Grid Code) as specified by the Commission under clause
(h) of sub-section (1) of Section 86 of the Act.
(s)
‘Indian Electricity Grid Code’ (or ‘IEGC’) ’ means the Grid Code specified by the CERC
under clause (h) of sub-section (1) of Section 79 of the Act;
(t)
‘Infirm Power’ means electricity injected into the Intra-State Grid prior to the date of commercial
operation of a unit of the generating station in accordance with the APSERC State Grid Code.
(u)
‘Integrated Day Ahead Market’ means a market where Day Ahead Contracts are transacted
on the power exchanges, including collective transactions under Day Ahead Market (DAM),
Green Day Ahead Market (Green DAM), and High Price Day Ahead Market (HP-DAM);
(v)
‘Interface meters’ means interface meters as defined under the Central Electricity Authority
(Installation and Operation of Meters) Regulations, 2006, as amended from time to time and/or
any re- enactment thereof;
(w)
‘MSW seller’ means a seller in the case of a generating station based on Municipal Solid Waste
and includes Refuse Derived Fuel (RDF) based MSW generating station;
(x)
‘NERPC’ means North Eastern Regional Power Committee;
(y)
‘Normal Rate of Charges for Deviation’ means the charges for deviation (in paise/kWh) as
referred to in Regulation 8 of these regulations;
(z)
‘Open Access Regulations’ means the Arunachal Pradesh State Electricity Regulatory
Commission (Terms and Conditions of Intra-State Open Access) Regulation, 2026 as amended
from time to time;
3
The Arunachal Pradesh Extraordinary Gazette, March 16, 2026
(aa) ‘Partial Open Access Consumer’ shall means Open Access Consumer connected to
transmission system or distribution system and having part of his contract demand with the
distribution licensee within the state;
(bb) ‘Qualified coordinating Agency (QCA)’ means the agency coordinating on behalf of
Wind/Solar Generators connected to a pooling station. QCA may be one of the generators or
any other mutually agreed agency for the following purposes: -
•
Coordinate for schedules with periodic revisions on behalf of all the Wind/Solar
Generators connected to the pooling station(s).
•
Responsible for coordination with STU/SLDC for metering, data collection/ transmission,
communication.
•
Undertake commercial settlement on behalf of the generators of such charges pertaining
to generation deviations only including payments to the Regional/State Deviation Pool
Accounts through the SLDC.
•
Undertake de-pooling of payments received on behalf of the generators from the State
Deviation Pool Account and settling them with the individual generators.
•
QCA shall be treated as a State Entity and shall be registered with SLDC.
(cc)
‘Reference Charge Rate’ or ‘RR’ means (i) in respect of a general seller whose tariff is
determined or adopted or approved under Section 62 or Section 63 or Section 86(1)(b) of the
Act, Rs/kWh energy charge as determined or adopted or approved by the Appropriate
Commission, or
(ii)
in respect of a general seller whose tariff is not determined or adopted or approved under
Section 62 or Section 63 or Section 86(1) (b) of the Act, and selling power through power
exchange(s), the price as discovered in the power exchange for the respective
transaction; or
(iii)
in case of captive consumption of a captive generating plant based on resources other
than renewable energy sources, the weighted average ACP of the Integrated-Day Ahead
Market segments of all the Power Exchanges for the respective time block; or
(iv)
in case of multiple contracts or transactions including captive consumption, the weighted
average of the reference rates of all such contracts or transactions.
(dd) ‘Regional Entity’ means a person whose metering and energy accounting are done at the
regional level by the Regional Load Despatch Centre;
(ee) ‘Run-of-River Generating Station’ or ‘RoR generating station’ means a hydro generating
station which does not have upstream pondage;
(ff)
‘Scheduled drawal’ for a time block or any period means the schedule of drawal in MW or
MWh ex-bus, including the schedule for Ancillary Services given by the concerned Load
Despatch Centre;
(gg) ‘Scheduled generation’ or ‘Scheduled injection’ for a time block or any period means the
schedule of generation or injection in MW or MWh ex-bus, including the schedule for Ancillary
Services given by the concerned Load Despatch Centre;
(hh) ‘SDSMA’ means State Deviation Settlement Account,
(ii)
‘Seller’ means a person, including a generating station, supplying electricity through a
transaction scheduled in accordance with the APSERC (State Grid Code).
(jj)
‘State Deviation Pool Account’ means the Account to be maintained and operated by the
State Load Despatch Centre as per Regulation 11 of these regulations;
(kk)
‘State Entity’ means such person who is in the SLDC control area and whose metering and
energy accounting is done at the state level;
(ll)
‘State Load Despatch Centre (SLDC)’ means State Load Despatch Centre (SLDC) of
Arunachal Pradesh.
(mm) ‘STU’ means the State Transmission Utility notified by the Government of Arunachal Pradesh
State under Section 39(1) of the Act.
(nn) ‘Time Block’ means the time block as defined in the State Grid Code;
(oo) ‘WS seller’ means a seller in case of a generating station based on wind or solar or hybrid of
wind-solar resources and shall include such solar or wind or hybrid generating station, with or
without storage.
Save as aforesaid and unless repugnant to the context or the subject-matter otherwise
requires, words and expressions used in these Regulations and not defined, but defined in the
Act, or the State Grid Code or the Indian Electricity Grid Code notified by CERC or any other
Regulations of this Commission shall have the meaning assigned to them respectively in the Act
or any other regulation.
4
The Arunachal Pradesh Extraordinary Gazette, March 16, 2026
4.
Scope :
(i)
These Regulations shall apply to the transactions of conveyance of electricity for all buyers
including distribution licensee, deemed distribution licensee including open access consumer
using intra-state transmission system and / or distribution system of distribution licensee.
(ii)
Deviation Settlement Mechanism under these Regulations shall also be applicable for all
Seller(s) having installed generating capacity 1 MW and above, including renewable energy
generators, open access generators, captive generators (excluding in-situ captive generators)
connected to intra-state transmission/ distribution system as the case may be.
Provided that, the revision in the threshold capacity limit shall be separately notified by
the Commission in stages over the period considering implementation aspects and based on
report to be submitted by SLDC.
5.
Adherence to Schedule and Deviation :
(i)
For a secure and stable operation of the grid, every grid connected Intra-State entity shall
adhere to its schedule as per the State Grid Code and shall not deviate from its schedule.
(ii)
Any deviation shall be managed by the State Load Despatch Centre and the computation,
charges and related matters in respect of such deviation shall be dealt with as per the given
provisions in these regulations.
6.
Duties of State Load Despatch Centre and State Entities :
(i)
These Regulations aim to govern the functioning of various State Entities in a way that
discipline is maintained with regard to the injection and drawal of energy by such State Entities
and the reliability and integrity of the power system is maintained.
(ii)
To meet these objectives, the necessary preconditions and covenants for participation by the
State Entities shall be as under:
(a)
The State Entities shall provide details of all contracts, along with the contract rate, to
SLDC that they have entered into for the exchange of energy.
(b)
The State Entities shall operate their equipment and loads in a manner that is consistent
with the provisions of the applicable regulations specified by the Central Electricity
Authority, Indian Electricity Grid Code, 2023 as amended from time to time and the
Arunachal Pradesh state Grid Code, as amended from time to time and shall include any
re-enactment thereof.
(c)
The State entities shall enter into Connection Agreement/Open Access Agreement with
the concerned transmission licensee, which shall specify physical and operational
requirements for reliable operation and gain physical access and connection to the intra-
State transmission system (In STS) or enter into Connection Agreement/Open Access
Agreement with concerned Distribution Licensee for use of distribution system, as the
case may be in accordance with the APSERC (Terms and Conditions of Intra-State Open
Access) Regulations, 2026 as amended from time to time and shall include any re-
enactment thereof and the provisions of the APSERC State Grid Code.
(d)
The State Transmission Utility (STU) shall make necessary arrangements for putting up
suitable meters along with Automated Meter Reading (AMR) facility as per the provisions
of the metering code under the State Grid Code, capable of recording energy flows at
15-minute intervals or any other time interval as specified by the Commission, at the
points of injection and drawal. The time synchronization of the metering system shall be
through the Global Positioning System with counter check from the State Energy
Accounting Centre within the SLDC.
(e)
SLDC shall take all decisions regarding the despatch of stations after evaluating all the
possible network parameters, constraints, and congestions in the transmission network
and in the eventuality of any such network aberration, the instructions by the SLDC
relating to despatch and drawal shall be binding on all State Entities.
(iii)
SLDC shall publish all such information as required for all other State Entities to be aware of the
energy exchanges taking place within the pool as well as exigency conditions, if any with regard
to despatch of power.
7.
Computation of Deviation :
(i)
Deviation in a time block for general sellers shall be computed as follows:
Deviation-general seller (DGS) (in MWh)=[(Actual injection in MWh)– (Scheduled generation
in MWh)].
Deviation-general seller (DGS) (in %) = 100 x [(Actual injection in MWh)–(Scheduled generation
in MWh)] / [(Scheduled generation in MWh)].
5
The Arunachal Pradesh Extraordinary Gazette, March 16, 2026
(ii)
Deviation in a time block for WS sellers shall be computed as follows:
(a)
For the period from the date of commencement of these regulations to 31.03.2026
Deviation-WS seller (DWS) (in MWh) = [(Actual Injection in MWh) – (Scheduled
generation in MWh)];
Deviation-WS seller (DWS) (in %) = 100 x [(Actual Injection in MWh) – (Scheduled
generation in MWh)] / [(Available Capacity)];
(b)
For the period from 01.04.2026 onwards
Deviation-WS seller (DWS) (in MWh) = [(Actual Injection in MWh) – (Scheduled
generation in MWh)];
Deviation-WS seller (DWS) (in %) = 100 x [(Actual Injection in MWh) – (Scheduled
generation in MWh)] / [(X% of Available Capacity) + (100-X) % of Scheduled Generation]:
Provided ‘X’ shall be stipulated by the Commission through separate order(s) after public
consultation if need arises.
(iii)
Deviation in a time block for buyers shall be computed as follows:
Deviation- buyer ((DBUY) (in MWh) = [(Actual drawal in MWh) – (Scheduled drawal in MWh)].
Deviation- buyer ((DBUY) (in %) = 100 x [(Actual drawal in MWh) –
(Scheduled drawal in MWh)] / [(Scheduled drawal in MWh)].
(iv)
Scheduling Period : The scheduling period shall comprise 96-time blocks [or such other
number of time blocks as may be stipulated through separate order from time to time], each of
15-minute duration [or such other time duration as may be stipulated through separate order
from time to time] starting from 00:00 hours (IST) ending with 24:00 hours (IST). The first-time
block of scheduling period shall commence from 00:00 hours (IST) to 00:15 hours (IST), second
time block of scheduling period shall commence from 00:15 hours (IST) to 00:30 hours (IST)
and so on or such other period as may be specified by the Commission.
(v)
Guiding Principles for Scheduling and Despatch : All the General Sellers, RoR hydro
sellers, MSW Sellers, WS Sellers and Buyers under these Regulations shall be guided by the
scheduling and despatch code and procedure formulated by the SLDC in accordance with the
provisions of applicable APSERC State Grid Code and amendment thereof. The MoD principles
as specified in the State Grid Code and the scheduling and despatch procedure thereon shall
be governed by following principles:
(a)
For the purpose of load generation balance during day ahead scheduling, Buyer/Utility-wise
MoD principle shall be followed.
(b)
Wheeling transactions of captive users and open access consumers shall be despatched as
contracted subject only to transmission constraints and system emergency conditions.
(c)
During real time operation, in case the grid parameters including frequency, voltage parameters
and transmission line loading and substation loading conditions deviate beyond permissible
operating range specified in the State Grid Code or IEGC, SLDC shall take suitable measures in
the interest of reliable and safe grid operations or to ensure compliance of RLDC instructions in
conformity with the provisions of the CERC (Deviation Settlement Mechanism and Related
Matters) Regulations, 2024 and its amendments thereof. Accordingly, SLDC shall issue
necessary despatch or curtailment instructions in accordance with MoD principles for the state
as whole, so as to maintain the load- generation balance and comply with conditions stipulated
under IEGC and State Grid Code.
(d)
SLDC shall maintain and publish separate accounts of such actions initiated by SLDC in the
interest of grid operation or in compliance of RLDC instructions in conformity with CERC
(Deviation Settlement Mechanism and Related Matters) Regulations, 2024 as amended from
time to time. SLDC shall publish weekly reports of exchange of power capacity, if any, amongst
the State Entities resulting on account of such SLDC interventions.
(e)
The time block wise settlement of such power exchange on account of such action initiated by
SLDC shall be settled at the applicable Energy Charge rate of concerned generating station, for
the respective time block.
8.
Normal Rate of Charges for Deviations :
(i)
The Normal Rate (NR) of charges for deviation for a particular time block shall be the highest of
(a), (b) or (c); where (a), (b) and (c) are as follows:
(a)
the weighted average ACP (in Paise /kWh) of the Integrated-Day Ahead Market
segments of all the Power Exchanges;
6
The Arunachal Pradesh Extraordinary Gazette, March 16, 2026
(b)
the weighted average ACP (in Paise /kWh) of the Real Time Market segments of all the
Power Exchanges;
(c)
the sum of:
1/3 [ Weighted average ACP (in paise/kWh) of the Integrated-Day Ahead Market
segments of all the Power Exchanges];
1/3 [ Weighted average ACP (in paise/kWh) of the Real-Time Market segments of
all the Power Exchanges]; and
1/3 [Ancillary Service Charge (in paise/kWh) computed based on the total quantum
of Ancillary Services (SRAS UP and TRAS UP) deployed and the net charges
payable to the Ancillary Service Providers for all the Regions]:
Provided further that in case of non-availability of ACP for any time block on
a given day, ACP for the corresponding time block of the last available day shall be
considered.
(ii)
The normal rate of charges for deviation shall be rounded off to the nearest two decimal places.
9.
Charges for Deviation :
1.
Charges for Deviation, in respect of a general seller (other than an RoR generating station
and a generating station based on municipal solid waste) shall be as under:
Deviation by way of over injection
(Receivable by the Seller)
Deviation by way of under injection
(Payable by the Seller)
(I) For Deviation upto [10% DGS or 50 MW, whichever is less] and f within f band
[f=System frequency and f band = [49.90Hz ≤ f ≤50.05 Hz]
(i) @ RR when [49.97 Hz ≤ f ≤50.03 Hz]
(i) @ RR when [49.97 Hz ≤ f≤50.03 Hz]
(ii) When [50.03 Hz < f ≤50.05 Hz], for every
increase in f by 0.01 Hz, charges for
deviation for such seller shall be reduced
by 25% of RR so that charges for deviation
become 50% of RR when f = 50.05Hz
(ii) When [50.03 Hz < f ≤50.05 Hz],
for every increase in f by 0.01 Hz, charges
for deviation for such seller shall be
reduced by 7.5% of RR so that charges for
deviation become 85% of
RR when f = 50.05Hz
(iii) When [49.97 Hz > f ≥ 49.90 Hz],
for every decrease in f by 0.01 Hz,
charges for deviation for such seller shall
be increased by 2.15% of RR so that
charges for deviation become 115% of
RR when f = 49.90Hz
(iii) When [49.97 Hz > f ≥ 49.90Hz],
for every decrease in f by 0.01 Hz,
charges for deviation for such seller shall
be increased by 7.15% of RR so that
charges for deviation becomes 150% of
RR when f=49.90Hz
(II) For Deviation up to [10% DGS or 50 MW, whichever is less] and f outside f band
(i) @ zero when [ 50.05 Hz < f < 50.10 Hz]:
Provided that such seller shall pay @ 10%
of RR when [ f ≥ 50.10 Hz]
(i) @ zero when [ 50.05 Hz < f < 50.10 Hz]:
Provided that such seller shall pay @ 10%
of RR when [ f ≥ 50.10 Hz]
(ii) @ 115 % of RR when [f < 49.90 Hz]
(ii) @ 115 % of RR when [f < 49.90 Hz]
(III) For Deviation beyond [10% DGS or 50 MW, whichever is less] and f within and
outside f band
(i) @ zero when (f < 50.10 Hz):
Provided that such seller shall pay @ 10%
of RR when [ f ≥ 50.10 Hz]
(i) @ zero when (f < 50.10 Hz):
Provided that such seller shall pay @ 10%
of RR when [ f ≥ 50.10 Hz]
2.
Charges for Deviation, in respect of a general seller being an RoR generating station, shall
be without any linkage to grid frequency, as under:
Deviation by way of over injection
(Receivable by the Seller)
Deviation by way of under injection
(Payable by the Seller)
(i)
@ RR for deviation up to [15% DRoR or
2 MW, whichever is less];
(ii) @ Zero for deviation beyond [15% D
RoR or 2 MW, whichever is less]
(i)
@ RR for deviation upto [15% DRoR or
2MW, whichever is less];
(ii) @ 105% of RR for deviation beyond [15%
D RoRor2 MW, whichever is less] and
upto [20% D RoR or 4MW, whichever is
less];
(iii) @ 110% of RR for deviation beyond [20%
D RoR or 4 MW, whichever is less].
7
The Arunachal Pradesh Extraordinary Gazette, March 16, 2026
3.
Charges for Deviation, in respect of a general seller being a generating station based on
municipal solid waste, shall be without any linkage to grid frequency, as under:
Deviation by way of over injection
(Receivable by the Seller)
Deviation by way of under injection
(Payable by the Seller)
(i)
@ contract rate for deviation upto [20%
DGS];
(ii) @ Zero for deviation beyond [20%
DGS];
(i)
@ contract rate for deviation upto [20%
DGS];
(ii) @ 110% of contract rate for deviation
beyond [20% DGS]
4.
Charges for Deviation, in respect of a WS Seller, including such generating stations aggregated
at a poolling station through QCA shall be without any linkage to grid frequency, as under:
Deviation by way of over injection
(Receivable by the Seller)
Deviation by way of under
injection (Payable by the Seller)
(i) for VLwS (1) @ contract rate;
(ii) for VLwS (2) @ 90% of contract rate
(iii) beyond VLwS (2) @ Zero;
(i) for VLwS (1) @ contract rate;
(ii) for VLwS (2) @ 110% of contract rate;
(iii) beyond VLwS (2) @ 200% of contract rate’
(i)
Note-1: Volume Limits for WS Seller (VLwS): Volume limits of a WS Seller for the period
from the date of commencement of these regulations to 31.03.2026 shall be as under:
WS Seller)
Volume Limit
A generating station based on solar or a
hybrid of wind –solar resources
VLwS (1) = Deviation upto 10% DWS
VLwS (2) = Deviation beyond 10% DWS and
upto 15% DWS
A generating station based on wind resource
VLwS (1) = Deviation upto 15% DWS
VLwS (2) = Deviation beyond 15% DWS and
upto 20% DWS
(ii)
Volume limit of a WS Seller for the period from 01.04.2026 onwards:
WS Seller)
Volume Limit
A generating station based on solar or a
hybrid of wind –solar resources
VLwS (1) = Deviation upto 5% DWS
VLwS (2) = Deviation beyond 5% DWS and
upto 10% DWS
A generating station based on wind resource
VLwS (1) = Deviation upto 10% DWS
VLwS (2) = Deviation beyond 10% DWS and
upto 15% DWS
(iii)
Note-2: In case of aggregation of WS sellers at a pooling station through QCA:
(a)
the contract rate for the purpose of deviation shall be equal to the weighted
average of the contract rates of all individual WS seller(s) opting for aggregation at
the pooling station;
(b)
Available Capacity shall be equal to the cumulative capacity rating of wind turbines
or solar inverters that are capable of generating power in a given time block;
(c)
de-pooling of deviation charges for WS seller(s) connected to the pooling station
shall be as per the methodology mutually agreed upon between the QCA and such
individual WS seller(s).
5.
Charges for Deviation, in respect of a Standalone Energy Storage System (ESS), shall be the
same as applicable to a general seller (other than an RoR generating station and a generating
station based on municipal solid waste) as specified in Clause (1) of this Regulation:
Provided that in the charging mode, deviation by way of over drawal shall be treated as
under injection and deviation by way of under drawal shall be treated as over injection and the
charges for deviation shall be settled accordingly:
Provided further that the charges for deviation including the formula for computation of
Deviation, in respect of charging of a standalone ESS being pumped hydro storage plant shall
be the same as applicable to a WS seller being a generating station based on solar resources.
8
The Arunachal Pradesh Extraordinary Gazette, March 16, 2026
6.
Charges for Deviation including the formula for computation of Deviation, in respect of a WS
Seller with ESS connected at the same interconnection point shall be the same (i) as applicable
to a WS seller of respective category during the period solar or wind or hybrid generating station
is injecting power, (ii) as applicable to a standalone ESS as per sub- clause (5) of this
Regulation, when only ESS is injecting power and (iii) as applicable to a standalone ESS for
drawl by ESS based on drawal schedule from the grid as per sub-clause (5) of this Regulation.
Note: Each generator and ESS shall be metered with Special Energy Meter (SEM) so that
individual actual injection/drawal can be captured.
7.
Charges for Deviation, in respect of a Buyer, shall be receivable or payable as under:
Deviation by way of under drawal
(Receivable by the Buyer)
Deviation by way of over drawal
(Payable by the Buyer)
(I) For VLB (1) and f within fband
[VLB= Volume limit for Buyer]
(i) @ 90% of NR whenf =50.00 Hz;
(i) @ NR when f =50.00 Hz;
(ii) When 50.00 Hz < f ≤50.05 Hz , forevery
increase in f by 0.01 Hz, charges for
deviation for such buyer shall be
decreased by 8% of NR so that
charges for deviation become 50% of
NR when f = 50.05Hz;
(ii) When 50.00 < f ≤ 50.05 Hz , for every
increase in f by 0.01 Hz, charges for
deviation for such buyer shall be
decreased by 5% of NR so that
charges for deviation become 75% of
NR when f = 50.05Hz;
(iii) When [50.00 Hz > f ≥ 49.90 Hz], for
every decrease in f by 0.01 Hz,
charges for deviation for such buyer
shall be increased by 1 % of NR so that
charges for deviation become100% of
NR when f = 49.90Hz;
(iii) When [50.00 Hz > f ≥ 49.90 Hz], for
every decrease in f by 0.01 Hz,
charges for deviation for such buyer
shall be increased by 5% of NR so that
charges for deviation become150% of
NR when f = 49.90Hz.
(II) For VLB (1) and f outside fband
(i) @ zero when [ 50.05 Hz < f < 50.10
Hz]: Provided that such buyer shall pay
@ 10% of NR when [ f ≥ 50.10 Hz];
(i) @ 50% of NR when [ 50.05 Hz < f<
50.10 Hz]:@ zero when [f ≥ 50.10 Hz];
(ii) @ NR when [f < 49.90 Hz];
(ii) @ 150 % of NR when [f < 49.90 Hz].
(III) For VLB (2) and f within and outside fband
(i) @ 80% of NR when f ≤ 50.00 Hz;
(ii) @ 50% NR when [50.00 Hz < f ≤ 50.05
Hz];
(iii) @ zero when [50.05 Hz < f <50.10 Hz]:
Provided that such buyer shall pay@ 10% of
NR when [ f ≥50.10 Hz];
(i) @ 150% of NR when f < 50.00 Hz;
(ii) @ NR when [50.00 Hz ≤ f ≤ 50.05 Hz];
(iii) @ 75% NR when [50.05 Hz <f<
50.10@ zero when [ f ≥ 50.10 Hz].
(IV) For VLB (3) and f within and outside f band
(i) @ zero when f < 50.10 Hz: Provided such
buyer shall pay @ 10% of NR when
[ f ≥ 50.10 Hz];
(i)
@ 200% of NR when f <50.00 Hz;
(ii)
@ NR when [50.00 Hz ≤ f < 50.10 Hz]
@ 50% of NR when [ f ≥ 50.10 Hz].
Volume Limits for Buyer:
Buyer
Volume Limit
Buyer (with a schedule upto 400 MW ).
VLB (1) = Deviation [20% DBUY or 40 MW,
whichever is less]
VLB (2) = Deviation beyond [20% DBUY or
40 MW, whichever is less
9
The Arunachal Pradesh Extraordinary Gazette, March 16, 2026
8.
Charges for injection of infirm power :
(a)
The charges for deviation by way of injection of infirm power shall be zero:
Provided that if infirm power is scheduled after trial run as specified in the State
Grid Code, the charges for deviation over the scheduled infirm power shall be as
applicable for a general seller or WS seller, as the case may be.
(b)
Notwithstanding the provisions of clauses (1) and (4) of this Regulation, when the system
frequency, f > 50.05Hz, the charges for injection of infirm power or for deviation of
scheduled infirm power after the successful trial run by way of over injection by a general
seller or WS seller, as the case may be, shall be zero.
9.
Drawal of Start-up Power before COD by a generating unit shall be treated as deviation for the
purpose of commercial settlement. The charges for deviation for drawal of start-up power before
the COD of a generating unit or for drawal of power to run the auxiliaries during the shut-down
of a generating station shall be payable at the reference charge rate or contract rate or in the
absence of reference charge rate or contract rate, the weighted average ACP of the Day Ahead
Market segments of all Power Exchanges for the respective time block, as the case may be.
10.
Notwithstanding anything contained in Sub-Regulation (1) to (9) of this Regulation, in case of
forced outage or partial outage of a seller, the charges for deviation shall be @ the reference
charge rate for a maximum duration of eight (8) time blocks or until the revision of its schedule,
whichever is earlier.
10.
State DSM Account (SDSMA) :
The State Load Despatch Centre shall prepare and issue (to all Sellers/Buyers) SDSMA
charges to all Sellers/ Buyers as per the modalities and timelines as under:
(i)
Billing Cycle: The SDSMA billing cycle for all Sellers/ Buyers shall be monthly (calendar
month wise).
(ii)
Meter Reading: Meter Reading shall be automatically read and communicated to SLDC.
(iii)
Implemented Schedule: For preparation of SDSMA Statement, the SLDC shall consider
implemented schedule as available in the NERLDC and SLDC websites and
implemented schedule received from Power Exchanges through E-Mail. SLDC shall be
responsible for timely (as per APSERC State Grid Code) updating and uploading of the
implemented schedule in respect of all Sellers/ Buyers in the SLDC website.
(iv)
Frequency: For preparation of SDSMA Statement, SLDC shall consider frequency as
considered by NERPC in the DSM Statement issued to Distribution licensee, as available
in NERPC or as declared by NERLDC in its website.
(v)
Confirmation of Meter-reading and Schedule: Since meter reading and implemented
schedule data are received in encrypted softcopy, so to minimize the possibility of error,
before processing of the SDSMA bill, SLDC shall again verify data of schedule and
energy injection/drawal from the concerned Sellers/ Buyers and concerned metering
Division of Transmission licensee and Distribution licensee. The Sellers/ Buyers and the
concerned metering Division of Transmission licensee and Distribution licensee shall
verify and confirm the required information within 2 (two) working days from the date of
receipt of such data from SLDC through email.
(vi)
Processing of SDSMA Bill: SLDC shall prepare SDSMA bill within five (5) working days
after the receipt of all related data from all concerned as above. Further, SLDC shall
issue the SDSMA bill to all concerned through hardcopy and softcopy. The softcopy of
the SDSMA bill shall be made available by publishing it on the SLDC website from the
date of issue of SDSMA bill. The soft copy of the SDSMA shall broadly contain the
following information:
(a)
Details of Deviation Settlement Method Tariff Structure currently in force;
(b)
Details of Block-wise,Day-wise and total Deviation transactions for each Entity
(details shall include Scheduled Energy, actual Energy, Charges for Deviation
along with net amount payable/receivable by them);
(c)
Details of transmission constraints and Grid disturbances;
(d)
Any other details which State Load Despatch Centre feels necessary to complete
the Deviation Settlement Method Account.
11.
Accounting of Charges for Deviation Pool Account :
(i)
A statement of Charges for Deviations including Additional Charges for Deviation levied under
these Regulations shall be prepared by the SLDC on weekly basis by the Thursday of the week
and shall be issued to all constituents by Tuesday, for seven-day period ending on the
penultimate Sunday mid-night.
10
The Arunachal Pradesh Extraordinary Gazette, March 16, 2026
(ii)
All payments on account of Charges for Deviation including Additional Charges for Deviation
levied under these Regulations and Interest, if any, received for late payment shall be credited
to the funds called the “State Deviation Pool Account”, which shall be maintained and operated
by the SLDC in accordance with the provisions of these Regulations.
Provided that—
(a)
The Commission may by Order direct any other entity to operate and maintain respective
“State Deviation Pool Account”.
(b)
Separate books of accounts shall be maintained for the Principal component and Interest
component of Charges for Deviation and Additional Charges for Deviation by the SLDC.
(c)
The State entities shall comply with statutory requirements for payment of applicable
statutory levies, including but not limited to Goods and Service Tax (GST), Tax deduction
at source (TDS).
(d)
The State entities shall facilitate SLDC in meeting with the reporting requirements of
Statutory Authorities, as necessary.
(iii)
The State Deviation Pool Account shall receive credit for:
(a)
Payments on account of charges for deviation referred to in Regulation 9 of these
regulations and the late payment surcharge as referred to in Regulation 11 of these
regulations.
(b)
Receipt, from Deviation and Ancillary Services Pool Account- Regional, towards Reactive
energy exchange, DSM etc. issued for the State by NERPC in accordance with
IEGC/CERC DSM Regulations.
(c)
Such other charges as may be notified by the Commission.
(iv)
The State Deviation Pool Account shall be charged for:
(a)
Any cost of expense or other charges incurred on recovery of Charges for Deviation.
(b)
Over dues or penal Interest, if applicable
(c)
Normal Interest
(d)
Regional Deviation Pool Account
(e)
Charges for Deviation and Additional Charges for Deviation.
(f)
Such other charges as may be notified by the Commission.
(v)
The Settlement Account for Inter-State Deviation of the State as well as that for Intra-State
Deviation shall be maintained separately by SLDC.
(vi)
The surplus amount in the State Deviation Pool Account at the end of the financial year shall be
utilised for the purpose of improvements in power system operations, for undertaking such
measures and studies for improvement in reliability, security and safety of grid operations,
undertaking capacity building and training programs related to system operations and market
operations and for such other purposes as may be specified by Commission with prior approval
of the Commission. The SLDC shall prepare Scheme(s) and shall submit annual plan to the
Commission before utilization of surplus fund. The Commission, if so desire, may invite
proposals/suggestions from various stakeholders for utilization of such surplus amount in the
State Deviation Pool Account.
Provided that, the short fall in funds in the State Deviation Pool Account; if any, at the end
of the weekly settlement period shall be recovered by levy of additional charge from the State
Entities in proportion to Net Deviation Charges Payable by concerned State Entity for the
applicable weekly settlement period through supplementary bills.
Provided that SLDC shall submit the Annual statement of SDSM Account to Commission
for information.
12.
State Energy Accounting :
(i)
A detailed energy accounting procedure shall be prepared by the SLDC as per Regulation 9
along with methodologies for the computation of Charges for Deviation for each state entity in
line with the provisions of these Regulations within three months of notification of these
Regulations and shall be submitted to the Commission for approval.
(ii)
Provided that, SLDC shall undertake stakeholder consultation by uploading the draft procedure
and methodology on SLDC’s website before submission of procedure to the Commission for
approval.
(iii)
The SLDC shall prepare a statement of State Energy Account including Reactive Energy
Account for each time block for the Buyers and Sellers on a monthly basis. Data required for the
billing of partial open access consumers shall be passed on to the billing center of the
distribution licensee by SLDC.
(iv)
The charges for over-drawal/under-injection and under-drawal/over-injection of electricity
shall be computed by the SLDC in accordance with the methodology used for preparation of
“State Energy Accounts”.
11
The Arunachal Pradesh Extraordinary Gazette, March 16, 2026
(v)
The SLDC shall, on weekly basis, prepare and publish on its website the records of the
Deviation Accounts, specifying the quantum of over-drawal/under-injection and the
corresponding amount of Charges for Deviation payable/receivable for each Buyer and Seller
for all the time-blocks.
13.
Schedule of Payment of charges for deviation :
(i)
The payment of charges for deviation shall have a high priority and the concerned State entity
shall pay the due amounts within 10 (ten) days of the issue of Statement of charges for
deviation by the SLDC, failing which late payment surcharge @ 0.04% shall be payable for each
day of delay.
(ii)
All Payment to the entities entitled to receive any amount on account of Charges for Deviation
shall be made within two working days of the receipt of payments in the “State Deviation Pool
Account”.
Provided that –
In case of delay in the payment of Charges for Deviations into the State Deviation Pool
Account and Interest there on if any, beyond 12 days from the date of issue of the Statement of
Charges for Deviations, the State Entities receiving payment for Deviation or Interest thereon
shall be paid from the balance available in the State Deviation Pool Account. In case the
balance available is not sufficient to meet the payment to the State Entities, the payment from
the State Deviation Pool Accounts shall be made on pro rata basis from the balance available in
the State Deviation Pool Account.
(iii)
If, any State entity, at any time during the previous financial year, fails to make payment of
charges for deviation within the time specified in these regulations, shall be required to open a
Letter of Credit (LC) equal to 110% of its average payable weekly liability for deviations in the
previous financial year in favour of the State Load Despatch Centre within a fortnight from the
start of the current financial year.
(iv)
In case of failure to pay into the State Deviation Pool Account within 10 (ten) days from the date
of issue of Statement of charges for deviation, the State Load Despatch Centre shall be entitled
to encash the LC of the concerned State entity to the extent of the default and the concerned
State entity shall recoup the LC amount within 3 days.
Provided that, if the entity is defaulting continuously, for delay/ non-payment of DSM
charges, after encashing the LC, the SLDC shall approach the Commission with the
recommendation for initiating the penal action against the default entity for the persistence
default, under Section 142 of EA 2003.
14.
Reactive Energy Management and Accounting :
SLDC will be responsible for managing the Reactive Energy Requirement as per the Clause 10.7 of
Arunachal Pradesh State Electricity Regulatory Commission (State Grid Code) Regulations, 2025 as
amended from time to time. The settlement of Reactive Energy Pool Account shall be in accordance
with the procedures defined in State Grid Code.
Provided that, till the time the separate Reactive Energy Pool Account for the intra state entities
are created and operationalized by the SLDC, the amount available in the State Deviation Pool
Account may also be utilized by SLDC for payment to the Regional Pool account on temporary basis.
15.
Compliance with the Instructions of State Load Despatch Centre :
Notwithstanding anything specified in these Regulations, the Sellers and the Buyers shall strictly follow
the instructions of the SLDC on injection and drawl in the interest of grid security and grid discipline.
16.
Transition Period for implementation of these Regulations :
(i)
The Regulations shall come into force from the date of its publication in the Official Gazette and
remain in force unless amended, varied, altered, or modified by the Commission.
(ii)
SLDC shall develop and submit detailed procedures in accordance with these regulations within
3 months of the notification of these regulations.
(iii)
SLDC shall prepare the required software and shall run mock trial within six months in
accordance with these regulations.
(iv)
The State Power Committee constituted under State Grid Code shall provide necessary support
to SLDC in finalizing the procedures mentioned under these Regulations and also support the
Commission for suitable modifications/issuance of operating procedures, practice directions and
amendment to the provisions of this Regulations, as may be necessary, time to time.
17.
Treatment of Gaming :
(i)
The Commission, either suo-motu or on a Petition made by the SLDC, or any affected party,
may initiate proceedings against any General Seller or any Buyer on charges of gaming and if
required, may order an enquiry to be made by such officer of the Commission or such other
party as the Commission may deem fit. The enquiry officer or such other party so appointed
shall submit the findings after enquiry in the matter within such time as may be fixed by the
Commission and such investigating officer or such other party shall exercise all powers as
envisaged under Section 128 of the Act.
12
The Arunachal Pradesh Extraordinary Gazette, March 16, 2026
(ii)
If in the proceedings initiated by the Commission or in the enquiry made in this regard under
Clause (1) above, it is proved that any General Seller or any Buyer has indulged in gaming, the
Commission may without prejudice to any other action under the Act or Regulation made
thereunder, disallow any Charges for Deviation to such Seller or Buyer during the period of such
gaming.
18.
Power to Relax :
The Commission may by general or special order, for reasons to be recorded in writing and after
giving an opportunity of hearing to the parties likely to be affected, may relax any of the provisions of
these regulations on its own motion or on an application made before it by the affected party.
19.
Power to Amend :
The Commission, recording the reasons in writing, may, at any time, vary/ alter/ modify/ amend any of
the provisions of these Regulations through an amendment.
20.
Power to Remove Difficulty :
If any difficulty arises in giving effect to these regulations, the Commission may on its own motion or
on an application filed by any affected party, issue such practice directions as may be considered
necessary in furtherance of the objective of these regulations.
21.
Interpretation :
If a question arises relating to the interpretation of any provision of these Regulations, the decision of
the Commission shall be final.
By the Order of the Commission
Dibyatanu Sengupta
Secretary (i/c),
Arunachal Pradesh State Electricity Regulatory Commission
Itanagar.
___________