No. DRD-13012(17)/44/2026-DRD-RD.— In order to align the Rural Development framework with the
national vision of Viksit Bharat@2047 by providing an enhanced statutory wage employment of one hundred
and twenty five (125) days in each financial year to such rural households whose adult members volunteer
to undertake unskilled manual work; and to focus on empowerment, growth, convergence and saturation, the
Government of Arunachal Pradesh is pleased to notify the “Arunachal Pradesh Viksit Bharat - Guarantee
for Rozgar and Ajeevika Mission (Gramin) (VB-G RAM G) Scheme 2026”, under the provisions of the
Viksit Bharat - Guarantee for Rozgar and Ajeevika Mission (Gramin) Act, 2025.
Secretary
Rural Development Department,
Government of Arunachal Pradesh,
Itanagar.
2 The Arunachal Pradesh Extraordinary Gazette, June 28, 2026
NOTIFICATION
In exercise of the powers conferred by sub-section(1) of Section 3 of the Viksit Bharat—Guarantee
for Rozgar and Ajeevika Mission (Gramin) Act, 2025, the Government of Arunachal Pradesh hereby notifies
the following Scheme, namely: —
“Arunachal Pradesh - ViksitBharat—Guarantee for Rozgar and Ajeevika Mission (Gramin) Scheme”
CHAPTER I - SHORT TITLE, COMMENCEMENT AND DEFINITIONS
1.
Short title and commencement :
(a)
This Scheme may be called the “Arunachal Pradesh Viksit Bharat – Guarantee for Rozgar
and Ajeevika Mission (Gramin) (VB – G RAM G) Scheme, 2026”.
(b)
This Scheme shall apply to all notified rural areas of Arunachal Pradesh.
(c)
It shall come into force from 1st of July, 2026.
2.
Definitions :
Unless the context other wise requires, all terms used herein shall have the meanings assigned to them
in Section 2 of the Act.
(a)
“Act” means the Viksit Bharat – Guarantee for Rozgar and Ajeevika Mission (Gramin) (VB-G RAM G)
Act, 2025
(b)
“Centrally Sponsored Scheme” means a scheme in which the Central Government provides full or
partial financial assistance and the State Governments undertake its implementation;
(c)
Secretary (RD) means the Administrative Head of the Rural Development Department.
(d)
“Commissioner (VB-G RAM-G)-cum-Director (RD) means the Departmental Head of Rural
Development Department who shall be the in-charge of the implementation of Scheme in the
State.
(e)
“District Programme Coordinator” means an officer of the State Government designated as such
officer for the implementation of the Scheme in a district;
(f)
“Additional District Programme Coordinator” means the Deputy Director (RD) in a district to assist
District Programme Coordinator.
(g)
“Block” means a Block Development Office within a district comprising a group of Gram Panchayats;
(h)
“Program Officer” means officers engaged at State and Block level to manage and oversee the
implementation of Scheme.
(i)
“Gram Panchayat” means elected local self-government institution at the village level established
under the provisions of the Arunachal Pradesh Panchayati Raj Act.
(j)
“adult” means a person who has completed the eighteenth year of age;
(k)
“household” means the members of a family related to each other by blood, marriage or adoption
and normally residing together and sharing meals or holding a common ration card;
(l)
“applicant” means the head of a household or any of its other adult members who has applied for
employment under the Scheme;
(m) “Implementing agency” includes any department of the Central Government or a State Government,
a Zila Parishad, Gram Panchayat or any local authority or the Government undertaking, to
undertake the implementation of any work taken up under the Scheme;
(n) “National Level Steering Committee” means a steering committee constituted by the Central
Government under sub-section;
(o) “Normative allocation” means the allocation of the fund made by the Central Government to the
State;
(p) “notification” means a notification published in th Official Gazette and the term “notify” or “notified”,
shall be construed accordingly;
(q) “rural area” means any area in a State except those areas covered by any urban local body or a
Cantonment Board established or constituted under any law for the time being in force;
(r) “Schedule” means Schedules appended to this Act;
(s)
“Scheme” means the Scheme notified by the State Government ;
(t) “State” means a State the State of Arunachal Pradesh;
The Arunachal Pradesh Extraordinary Gazette, June 28, 2026 3
(u)
“State Council” means the State Gramin Rozgar Guarantee Council constituted as per the Act;
(v)
“State Level Steering Committee” means a steering committee constituted as per the Act;
(w) “unskilled manual work” means any physical work which any adult person is capable of doing
without any skill or special training;
(x) “Viksit Bharat National Rural Infrastructure Stack” means the consolidated aggregation comprising
proposed works emerging from the Viksit Gram Panchayat Plans aggregated at the District and
State levels and aligned with the four thematic domains of works;
(y) “Viksit Gram Panchayat Plan” means a future-ready, convergence- based local development plan
aligned with the vision of Viksit Bharat@2047, formulated by the Gram Panchayat through a
participatory and evidence-based process and serving as the basis for identification and prioritisation
of works under this Act;
(z) “wage rate” means the wage rate referred to in Section 10;
(aa) “work” means any work undertaken or executed under the Scheme.
CHAPTER II—OBJECTIVES AND GUIDING PRINCIPLES
3.
Objectives
The Arunachal Pradesh Viksit Bharat – Guarantee for Rozgar and Ajeevika Mission (Gramin)
(VB – G RAM G) Scheme, 2026 shall have the following objectives, namely:
(a) To align the rural development framework with the national vision of Viksit Bharat @2047 by
providing an enhanced statutory wage-employment guarantee of one hundred and twenty-five
(125) days in each financial year to such rural households whose adult members volunteer to
undertake unskilled manual work, thereby enabling them to participate more effectively in the
expanded livelihood security framework.
(b) To focus on empowerment, growth, convergence and saturation through public works aggregating
into forming Viksit Bharat National Rural Infrastructure Stack, with a thematic focus on water
security through water-related works, core rural infrastructure, livelihood-related infrastructure
and special works to mitigate extreme weather events.
(c) To facilitate adequate farm-labour availability during peak agricultural seasons and in view of the
wage-employment guarantee for the rural workforce.
(d) To institutionalise convergence, saturation-driven planning and whole of government delivery through
Viksit Gram Panchayat Plans, integrated with the PM Gati Shakti to address the varying needs
of Gram Panchayats, powered by geospatial systems, digital public infrastructure, district and
State planning mechanisms, with such plans aggregated at the Block, District, State and National
levels.
(e) To modernise and strengthen governance, accountability and citizen engagement through a
comprehensive digital ecosystem, including biometric authentication at various levels, global
positioning system or mobile based worksite monitoring, real time management information
system dashboards, proactive public disclosures and the use of Artificial Intelligence for planning,
audits and fraud risk mitigation.
CHAPTER III - GUARANTEES, TIME LIMITS AND CONDITIONS
4.
Guarantee :
(a)
State Government shall, in such rural area in the State as may be notified by the Central Government,
provide to every household whose adult members volunteer to do unskilled manual work, not less
than one hundred and twenty-five days of guaranteed employment in a financial year in accordance
with the Scheme.
(b)
Every person who has done the work given to him under the Scheme shall be entitled to receive
wages at the wage rate for each day of work.
(c)
The disbursement of daily wages shall be made on a weekly basis or in any case not later than a
fortnight after the date on which such work was done.
(d)
If an applicant for employment under the Scheme is not provided such employment within fifteen
days of receipt of his application seeking employment or from the date on which the employment
has been sought in the case of an advance application, whichever is later, he shall be entitled to a
daily unemployment allowance in accordance with the provision of this section.
(e)
In case the payment of wages is not made within fifteen days from the date of closure of the muster
roll, the wage seekers shall be entitled to receive payment of compensation for the delay, at the
rate of 0.05% of the unpaid wages per day of delay beyond the sixteenth day of closure of muster
roll.
4 The Arunachal Pradesh Extraordinary Gazette, June 28, 2026
5.
Conditions for demand
(1)
Every adult member of a registered household whose name appears in the Gramin Rozgar
Guarantee Card, shall be entitled to apply for unskilled manual work under the Scheme; and
every such application shall be compulsorily registered, and a receipt issued with the date,
which shall be entered in the given digital platform.
(2) The State shall proactively verify the requirements of the Vulnerable Groups and provide them
with work.
(3) Application for work may be oral or written and made to the Gram Panchayat or to the Programme
Officer or any person authorised by the Program Officer or through any other means authorised
by the State Government.
(4) Applications for work may be filed individually or for a group together.
CHAPTER IV—PLANNING FRAMEWORK
6.
Viksit Gram Panchayat Plan (VGPP)
(1)
A future-ready, convergence based local development plan aligned with the vision of Viksit Bharat
@2047, formulated by the Gram Panchayat through a participatory and evidence-based process,
and serving as the basis for identification and prioritisation of works under this Scheme.
(2)
There shall be asystematic and participatory planning exercise undertaken at each tier of the
Panchayati Raj systemin accordance with the specified methodology.The Viksit Gram Panchayat
Plans shall be prepared by the Gram Panchayats using GIS-based tools, PM Gati Shakti layers
and other digital public infrastructure, and placed before the Gram Sabha for approval. Works
proposed to be undertaken by the Intermediate Panchayat, District Panchayat or other implementing
agencies shall likewise be placed before the respective Panchayats along with the expected
outputs and outcomes. The Viksit Gram Panchayat Plans shall be aggregated at the Block,
District and State levels to ensure coherence with sectoral priorities, broader rural development
strategies, and saturation-based planning for comprehensive coverage of eligible assets and
outcomes across all Gram Panchayats. All works emerging from the Viksit Gram Panchayat
Plans shall be consolidated into the Viksit Bharat—National Rural Infrastructure Stack.
(3) Every Gram Panchayat shall prepare saturation-mode plans based on its classification into
Category A, B, C, etc., determined based on development parameters, Panchayat advancement
Index (PAI), including proximity to urban areas, to address the varying needs of the Panchayats.
All such works shall be drawn exclusively from the approved Viksit Gram Panchayat Plan,
prepared using PM Gati Shakti,GIS-based tools and other digital public infrastructure.
(4) Annual plans would be prepared on the basis of the normative allocation.
(5) The works identified in the Viksit Gram Panchayat Plans shall be executed through various
Central, State and local schemes in convergence. The schemes to be taken up for such
convergence shall be notified by the Central Government.
(6) While preparing Viksit Gram Panchayat Plans and annual labour demand, no work shall be
proposed for execution during notified peak agricultural periods.
7.
Framework for Convergence and Integrated Planning :
A Unified Convergence Framework shall be established for coherent planning, execution and monitoring
of all works undertaken in rural areas, and for this purpose—
(1)
All Central, State or local schemes, as may be notified by the Central Government for the purpose
of convergence and saturation-based planning, shall be brought under a unified planning process
anchored in the Viksit Gram Panchayat Plans.
(2)
All existing assets and proposed works, whether funded under this Scheme or through any other
Central, State or local scheme, shall be mandatorily registered and tracked through the Viksit
Bharat National Rural Infrastructure Stack using the designated digital portal, which shall maintain
a comprehensive register of rural public works, prevent duplication, integrate departmental
investments, and align all works with saturation outcomes.
(3)
Single digital backbone for rural public works covering water security, core rural infrastructure,
livelihood-related infrastructure, and special works to mitigate extreme weather events; and all
planning shall follow a strict bottom-up process beginning with the preparation of the Viksit Gram
Panchayat Plan, which shall be successively aggregated at the Block, District and State levels,
and the aggregated State Plan shall be placed before the State Level Steering Committee for
approval. Annual plans would be prepared on the basis of the normative allocation.
(4)
Viksit Bharat National Rural Infrastructure Stack shall guide States, Districts and Panchayati Raj
Institutions in identifying priority infrastructure gaps, standardising work designs, and ensuring
that public investments contribute measurably to saturation outcomes at the Gram Panchayat,
Block and District levels.
The Arunachal Pradesh Extraordinary Gazette, June 28, 2026 5
(5)
This institutional architecture shall ensure a single-plan, multi-funding approach, promote
convergence across departments and schemes, and align all rural development efforts with the
Viksit Bharat @2047 vision of creating productive, resilient and transformative rural assets.
CHAPTER V— STATE INSTITUTIONAL ARCHITECTURE
8.
Implementing Department :
The Department of Rural Development, Arunachal Pradesh shall be the implementing Department
for the Scheme
9.
State Gramin Rozgar Guarantee Council :
(1)
At the state level, there shall be a State Gramin Rozgar Guarantee Council, which shall be called
the “Arunachal Pradesh State Gramin Rozgar Guarantee Council”. The Arunachal Pradesh State
Gramin Rozgar Guarantee Council shall have a state-level General Assembly, which shall consist
of the following office bearers/members:
(i) Chairperson
-
Chief Minister, Government of Arunachal Pradeesh
(ii) Vice-Chairperson
-
Minister, Panchayat and Rural Development
(iii) Members
-
(1)
Minister, Finance
(2)
Minister, Law, Legislative & Judicial Department
(3)
Minister, PWD
(4)
Minister, Fisheries
(5)
Minister, PHE
(6)
Minister, Environment, Forest and Climate Change
(7)
Minister, Land Resources, Soil & Water
Conservation Dept.
(8)
Minister, Social Justice, Empowerment
and Tribal Affairs.
(9)
Minister, Horticulture
(10) Minister, Animal Husbandry and Veterinary
(11) Minister, Agriculture & Farmers Welfare
(12) Minister, Irrigation & Water Resources
(13) Minister, Social Welfare, Women and Child
Development.
(14) Minister, Land Management
(15) Minister, Labour, Employment & Skill Development
(16) Chief Secretary, Government of Arunachal Pradesh
(17) Secretary/Commissioner of the respective department.
(18) 15 (fifteen) non-official members to be nominated by
the State Government, representatives of Panchayati
Raj Institutions, representatives of non-governmental
organisations and weaker sections of the society.
(iv) Member Secretary
-
Secretary (Rural Development) & Commissioner
(VB-GRAM-G)
(2)
The terms and conditions subject to which the Chairperson and members of the State Council may
be appointed and the time, place and procedure of the meetings (including the quorum at such
meetings) of the Council shall be notified as Rule separately.
(3)
The duties and functions of the Arunachal Pradesh State Gramin Rozgar Guarantee Council:
(i)
advising the State Government on all matters concerning the Scheme and its implementation
in the State;
(ii)
reviewing the monitoring and redressal mechanisms from time to time and recommending
improvements;
(iii)
monitoring the implementation of Act and the Scheme in the State and coordinating such
implementation with the Central Council;
(iv)
preparing the annual report to be laid before the State Legislature by the State Government;
(v)
any other duty or function as may be assigned to it by the Central Councilor the State
Government.
6 The Arunachal Pradesh Extraordinary Gazette, June 28, 2026
(4)
The State Council shall have the power to undertake an evaluation of the Scheme operating in the
State and for that purpose to collect or cause to be collected statistics pertaining to the rural
economy and the implementation of the Scheme and Programmes in the State.
10.
State Level Steering Committee :
(1)
At the state level, there shall be a State Level Steering Committee, to provide operational guidance,
coordination and monitor the implementation of the Scheme.
(2)
The State Level Steering Committee shall be presided over by the Chief Secretary of the State or by
an officer not below the rank of Principal Secretary nominated by the State Government and shall
comprise of the following members, namely: —
(i)
Secretary/Commissioner/Director – RD & PR, EF & CC, PWD, PHE, SW & W & CD,
Finance, SJETA, Agriculture, Horticulture and Land Management, Irrigation & Water
Resources, Fishery, Law, Legislative & Justice, AH & VT, SIRD, ArSRLM, SAU and any
other relevant department.
(ii)
The Commissioner (VB – GRAM G);
(iii) subject-matter experts, as may be determined by the State Government;
(iv) representatives of technical or research institutions; and
(v)
one member nominated by the Ministry of Rural Development, Government of India.
(3)
The State Level Steering Committee shall—
(i)
oversee State wide planning and convergence with other programmes;
(ii) review of district performance and ensure timely preparation of the aggregate State plan;
(iii) coordinate with the National Level Steering Committee and implement directions issued
therefrom;
(iv) support digital systems, monitoring arrangements and process improvements at the State
level; and
(v) perform such other functions as may be assigned to it by the State Government.
11.
Intermediate Panchayats :
1.
The Panchayats at the district and village levels shall be the principal authorities for planning,
implementation and monitoring of the Scheme made under this Act.
2.
The Panchayat at the district level, shall oversee and coordinate implementation of the Scheme in
the district, including finalisation and approval of the aggregate district level plan,supervision and
monitoring of works, ensuring convergence and perform such other functions as may be assigned
to it by the State Government.
3.
The Panchayat at the village level, shall prepare and finalise the aggregate Gram Panchayat level
plan, support villagers in planning and implementation, supervise works at Gram Panchayat and
Block levels, and facilitate convergence with line departments.
4.
Annual plans would be prepared on the basis of the normative allocation.
5.
The Gram Panchayat shall register households, receive and process applications for work, prepare
the Viksit Gram Panchayat Plans, execute the works assigned to it, maintain such records as
may be specified by the State Government and discharge such other responsibilities as may be
entrusted to it under the Scheme.
12.
District Programme Coordinator (DPC) :
1.
Deputy Commissioner shall be designated as the District Programme Coordinator for the
implementation of the Scheme in the district.
2.
The District Programme Coordinator shall be responsible for the implementation of the Scheme in
the district in accordance with the provisions of this Scheme and the rules made thereunder.
3.
The functions of the District Programme Coordinator shall be as follows, namely: —
(i)
the District Programme Coordinator shall be responsible for the consolidation and finalisation
of the district aggregate plan and shall oversee convergence, implementation and monitoring
of the Scheme at the district level in accordance with the provisions of this Act;
(ii)
the District Programme Coordinator shall ensure compliance with the provisions of this Scheme
and with the directions and guide lines issued by the Central Government and the State
Government, and shall accord such administrative sanctions and clearances as may be
required for the timely and effective implementation of the Scheme, including those relating
to digital, geospatial and monitoring systems;
The Arunachal Pradesh Extraordinary Gazette, June 28, 2026 7
(iii) the District Programme Coordinator shall coordinate with Programme Officers, and shall
review, monitor and supervise their performance using the monitoring framework, management
information system and accountability mechanisms established under Act and the Scheme;
(iv) the District Programme Coordinator shall conduct periodic inspections of works undertaken
under the Scheme, ensure adherence to quality and productivity standards and shall redress
the grievances of applicants through digital public infrastructure and designated grievance
redressal systems issued/notified by the Central Government.
4.
The District Programme Coordinator, shall prepare an aggregate plan for the district under his
jurisdiction by consolidating the approved Viksit Gram Panchayat Plans and aggregated Block
Plans and the proposals received from the Zila Panchayats.
13.
Programme Officer (Block Level) :
1.
At every Panchayat, Block Development Officer shall be designated as Programme Officer at the
panchayat level.
2.
The Programme Officer shall assist the Panchayat in discharging its functions under Act and the
Scheme made thereunder.
3.
The Programme Officer shall be responsible for matching the demand for employment with the
employment opportunities arising from works in the area under his jurisdiction.
4.
The Programme Officer shall prepare an aggregate plan for the Block under his jurisdiction by
consolidating the approved Viksit Gram Panchayat Plans and the proposals received from
intermediate panchayats.
5.
Without prejudice to the generality of sub-section (2), the functions of the Programme Officer shall
include—
(i)
monitoring all works and projects undertaken by the Gram Panchayats and other implementing
agencies within the Block, ensuring alignment with the Viksit Gram Panchayat Plans;
(ii)
sanctioning and ensuring payment of unemployment allowance to eligible households in
accordance with the provisions of this Act;
(iii)
ensuring prompt and fair payment of wages to all labourers employed under the Scheme
within the Block, including through digital and biometric authenticated payment systems, as
may be specified by the Central Government;
(iv)
ensuring that regular social audits of all works within the jurisdiction of each Gram Panchayat
are conducted by the Gram Sabha, and that timely and appropriate action is taken on objections
and findings arising from such audits;
(v)
dealing promptly with all complaints and grievances relating to the implementation of the
Scheme within the Block, through the grievance redressal mechanisms established under
sub-section (1) of Section 25 of this Act;
(vi)
ensuring the geo-tagging, digital recording and management information system reporting of
all works undertaken within the Block and compliance with monitoring, productivity, and
transparency framework, specified by the Central Government under this Act;
(vii) facilitating inter-departmental convergence at the Block level to support saturation-driven
planning and the execution of works under the Scheme; and
(viii) any other function as may be assigned to him by the district Programme Coordinator and the
State Government under this Act.
6.
The Programme Officer shall perform his functionunder the direction,control and superintendence
of the District Programme Coordinator.
14.
Responsibilities of Gram Panchayat :
The Gram Panchayat shall be responsible for—
(i)
registration of households and issuance of Gramin Rozgar Guarantee Cards;
(ii)
receiving work applications and maintaining records of Gramin Rozgar Guarantee Cards;
(iii)
preparing the Viksit Gram Panchayat Plans;
(iv)
every Gram Panchayat shall after considering there commendations of the Gram Sabha and
the Ward Sabhas, keeping in view of the demand for works, prepare a Viksit Gram Panchayat
Plan on saturation basis;
(v)
Annual plans would be prepared on the basis of the normative allocation.
(vi)
the Programme Officer shall allocate at least fifty per cent. of the works in terms of its cost
under the Scheme to be implemented through the Gram Panchayats;
(vii)
the Programme Officer shall supply each Gram Panchayat with—
8 The Arunachal Pradesh Extraordinary Gazette, June 28, 2026
(a)
the detail of muster rolls for the works sanctioned to be executed by it;
(b)
a list of employment opportunities available else where to the residents of the Gram
Panchayat;
(viii) the Gram Panchayat shall allocate employment opportunities among the applicants and ask
them to report for work;
(ix)
the works taken up by a Gram Panchayat under the Scheme, shall meet the required technical
standards and measurements;
(x)
executing works allotted to it by the Programme Officer; and
(xi) a Gram Panchayat may take up any work under the Scheme from Viksit Gram Panchayat
Plan within the area of the Gram Panchayat, as may be sanctioned by the Programme
Officer.
15.
Social Audit by Gram Sabha :
1.
The Gram Sabha, shall monitor and review the execution of all works undertaken under the Scheme
within the jurisdiction of the Gram Panchayat, in accordance with the provisions of this Act.
2.
The Gram Sabha shall conduct regular social audits of all works taken up under the Scheme within
the Gram Panchayat, as issued/notified by the Central Government.
3.
The Gram Panchayat shall make available to the Gram Sabha all records and documents required
for conduct of the social audit, including muster rolls, bills, vouchers, measurement books, sanction
orders, digital records, geo-tagged photographs and all other connected books of account and
papers, whether maintained in physical or electronic form.
CHAPTER VI - REGISTRATION AND ROZGAR GUARANTEE CARD
16.
Registration of households :
1.
Household Registration— The adult member of every household residing in any rural area and
willing to undertake unskilled manual work, may submit the names, ages and address of the
household to the Gram Panchayat within whose jurisdiction they reside, for the purpose of registration
of the household and issuance of a Gramin Rozgar Guarantee Card.
2.
Special Gramin Rozgar Guarantee Card, where the job seeker is—
(a)
a single woman;or
(b)
a person with disability;or
(c)
persons above sixty years of age;or
(d)
a released bonded labourer;or
(e)
a person belonging to a Particularly Vulnerable Tribal Group;or
(f)
a transgender person.
3.
The Special Gramin Rozgar Guarantee Card of a distinct colour, shall ensure special protection in
the providing work, work evaluation, and worksite facilities, as applicable.
4.
Before the new card is issued, the Gram Panchayat, with the concurrence of the Gram Sabha,
shall verify whether the applicant is a resident of the village and is available for employment under
the Scheme.
17.
Issue of Gramin Rozgar Guarantee Card :
1.
It shall be the duty of the Gram Panchayat, after making such enquiry, as it deems fit, to issue a
Gramin Rozgar Guarantee Card within fifteen days from the date of receipt of such application,
containing there in a unique Gramin Rozgar Guarantee Card number with details of the registered
adult members of the household, their photos, Bank or Post office account number, insurance
policy number and the Aadhaar numbers, if any.
2.
The Gram Panchayat, with the concurrence of the Gram Sabha, shall verify whether the applicant
is a resident of the village and is available for employment under the Scheme.
3.
The Gramin Rozgar Guarantee Card issued, shall be valid for three years, after which it may be
renewed after due verification.
4.
No Gramin Rozgar Guarantee Card shall be cancelled except on any of the following grounds—
(a)
where it is found to be a duplicate;
(b)
where the entire household has permanently migrated to a place outside the jurisdiction of
the Gram Panchayat and no longer resides in the village; or
(c)
where all adult members of the registered household are deceased.
The Arunachal Pradesh Extraordinary Gazette, June 28, 2026 9
5.
The State Government shall make arrangements for updating the following details in the Gramin
Rozgar Guarantee Card regularly while mentioning the key guarantees under the Scheme are
clearly listed as follows: —
(a)
number of days for which work was demanded;
(b)
number of days of work allocated;
(c)
description of the work allocated along with the muster roll number;
(d)
measurement details;
(e)
unemployment allowance, if any, paid;
(f)
date-wise amount of wages paid;
(g)
delay compensation paid if any;
(h)
asset provided, if any.
6.
Every worker shall have an opportunity of being heard and register any grievance either orally or in
writing, at all implementation levels for disposal as per the provisions of the Grievance Redressal
Mechanism under the Scheme.
18.
Issuance of Gramin Rozgar Guarantee Card in Case of Dislocation :
1.
Notwithstanding anything contained in this Schedule, in the event of any national calamity such as
flood, cyclone, tsunami and earthquake resulting in mass dislocation of rural population, the adult
members of rural households of areas so affected may—
(a)
seek for registration and get Gramin Rozgar Guarantee Card issued by the Gram Panchayat
or Programme Officer of the area of temporary relocation;
(b)
submit written or oral applications for work to the Programme Officer or the Gram Panchayat
of the area of temporary relocation; and
(c)
apply for re-registration and re-issuance of Gramin Rozgar Guarantee Card in the event of
any loss or destruction.
2.
The details of such Gramin Rozgar Guarantee Cards shall be intimated to the District Programme
Coordinator.
3.
In the event of restoration of normalcy, the Gramin Rozgar Guarantee Card so issued shall be
re-endorsed at original place of habitation and clubbed with the original Gramin Rozgar Guarantee
Card on being retrieved.
4.
The number of days of employment provided shall be counted while computing 125 days of guaranteed
employment per household.
CHAPTER VII - DEMAND FOR WORK AND ALLOTMENT
19.
Demand for Work :
1.
Every adult member of a registered household whose name appears in the Gramin Rozgar Guarantee
Card, shall be entitled to apply for unskilled manual work under the Scheme; and every such
application shall be compulsorily registered and a receipt issued with the date, which shall be
entered in the given digital platform.
2.
The Program Officer shall proactively verify the requirements of the Vulnerable Groups and provide
them with work.
3.
Application for work may be oral or written and made to the Gram Panchayat or to the Programme
Officer or any person authorised by the State Government or through digital platforms, or through
any other means authorised by the State Government.
4.
Applications for work may be filed individually or for a group together.
5.
There shall be no limit on the number of days of employment for which a person may apply, or on
the number of days of employment actually provided to him subject to the aggregate guarantee of
the household.
6.
Normally, applications for work must be for atleast six days of continuous work.
7.
Provision shall be made in the Scheme for advance application, that is, application which may be
submitted earlier than the date from which employment is sought.
8.
Provision shall be made in the Scheme for submission of multiple applications by the same person
provided that the corresponding periods for which employment is sought do not overlap.
20.
Allocation of Work :
1.
The Gram Panchayat and Programme Officer shall ensure that every applicant shall be provided
unskilled manual work in accordance with the provisions of the Scheme within fifteen days of
receipt of an application or the date from which he seeks work in case of advance application,
whichever is later.
10 The Arunachal Pradesh Extraordinary Gazette, June 28, 2026
2.
Priority shall be given to women in such away that atleast one-third of the beneficiaries shall be
women who have registered and requested for work. Efforts to increase participation of single
women and the person with disabilities shall be made.
3.
Applicants who are provided with work shall be intimated through any effective mode of communication
or by a public notice displayed at the office of Program Officer or at Panchayat Bhavan whichever
may be feasible.
4.
A list of persons who are provided with the work shall be displayed on the notice board of the Gram
Panchayat and at the office of the Programme Officer and at such other place as the Programme
Officer may deem necessary and the list shall be open for inspection by the State Government and
any interested person.
5.
As far as possible, the employment shall be provided within a radius of five kilometers of the village
where the applicant resides at the time of applying.
6.
A new work under the Scheme can be commenced if at least ten labourers become available for
work, provided that this condition shall not be applicable for new works, as determined by the State
Government, in hilly areas and in respect of afforestation works.
7.
In case the employment is provided outside the radius of five kilometers, the labourers shall be paid
ten per cent. of the wage rate as extra wages to meet additional transportation and expenses for
living.
8.
A period of employment may consist of any number of days, subject to a maximum of six working
days in a week.
CHAPTER VIII - MUSTER ROLLS, ATTENDANCE AND MEASUREMENT
21.
Muster rolls :
1.
The muster rolls for works undertaken under this Scheme shall be maintained through digital systems
and shall comply with the following requirements—
(a)
Each muster roll shall be in English and the local language and have a unique electronically
generated identity number (e-muster) issued through the management information system.
(b) The muster roll shall include the names of all workers who have demanded or been allocated
work and shall be authenticated by the authorised functionary of the Gram Panchayat or the
Programme Officer.
22.
Attendance recording :
Attendance at the worksite shall be recorded daily by an authorised person using biometric
attendance systems and all attendance details shall be made available for public viewing on a daily basis
through the designated management information system.
23.
Measurement of work :
1.
Payment of wages shall only be made based on measurements taken at the worksite by authorised
technical personnel within three days of the closure of the muster roll and recorded digitally through
systems integrated with the designated management information system.
2.
The State Government shall ensure the deployment of adequate technical personnel to enable
timely measurement. Suitable persons may be trained and deployed, with delegated technical
responsibilities, and shall be paid wages at skilled rates.
CHAPTER IX - WAGE PAYMENT AND DELAY COMPENSATION
24.
Wage payment :
1.
Wage rate to be paid to the worker will be decided and notified by the Central Government.
2.
Final wage payment shall be based on the actual quantity of work executed, as assessed by the
competent technical personnel and duly recorded in the e-Measurement Book (MB).
3.
The disbursement of daily wages shall be made on a weekly basis or in any case not later than
a fortnight after the date on which such work was done.
25.
Mode of payment :
The payment of wages shall, unless so exempted by the Central Government, be made through the
individual savings accounts of the workers in the relevant Banks or post Offices.
26.
Delay compensation :
1.
In case the payment of wages is not made within fifteen days from the date of closure of the muster
roll, the wage seekers shall be entitled to receive payment of compensation for the delay, at the
rate of 0.05% of the unpaid wages per day of delay beyond the sixteenth day of closure of
muster roll.
The Arunachal Pradesh Extraordinary Gazette, June 28, 2026 11
2.
Any delay in payment of compensation beyond a period of fifteen days from the date it becomes
payable, shall be considered in the same manner as the delay in payment of wages.
3.
For the purpose of ensuring accountability in payment of wages and to calculate culpability of
various functionaries or agencies, the States shall divide the processes leading to determination
and payment of wages into various stages such as, —
(a)
measurement of work;
(b)
computerising the muster rolls;
(c)
computerising the measurements;
(d)
generation of wage lists; and
(e)
uploading Fund Transfer Orders (FTOs), and specify stage-wise maximum time limits along
with the functionary or agency which is responsible for discharging the specific function.
4.
The computer system shall have a provision to automatically calculate the compensation payable
based on the date of closure of the muster roll and the date of deposit of wages in the accounts of
the wage seekers.
5.
District Programme Coordinator and Programme Officer shall pay the compensation up front after
due verification within the time limits as specified above and recover the compensation amount
from the functionaries or agencies who are responsible for the delay in payment.
6.
The number of days of delay, the compensation payable and actually paid shall be reflected in the
Management Information System.
CHAPTER X - UNEMPLOYMENT ALLOWANCE
27.
Eligibility :
1.
If an applicant for employment under the Scheme is not provided such employment within fifteen
days of receipt of his application seeking employment or from the date on which the employment
has been sought in the case of an advance application, whichever is later, he shall be entitled to a
daily unemployment allowance in accordance with the provision of this section.
2.
No such rate shall be less than one-fourth of the notified wage rate for the first thirty days during the
financial year and not less than one-half of the wage rate for the remaining period of the financial
year
28.
Procedure :
The unemployment allowance payable to the household of an applicant jointly, shall be sanctioned
and disbursed by the Programme Officer or such local authority (including the Panchayat at the District,
intermediate or village level).
Every payment of unemployment allowance shall be made or offered not later than fifteen days from
the date on which it became due for payment.
CHAPTER XI - CATEGORIES OF WORKS & ELIGIBILITY CRITERIA FOR
INDIVIDUAL BENEFICIARY WORK
29.
Works & Categories under the Scheme-
1.
Focus of the Scheme—Classification of Works : The Scheme shall focus on the following categories
of works, as identified in the Viksit Gram Panchayat Plans and aggregated into the Viksit Bharat
National Rural Infrastructure Stack.
2.
the works to be taken up under the Scheme, shall fall under the following Categories, together with
their thematic focus and intended outcomes, namely: —
A.
Category I - Water-Related Works (for Water Security)—
(a)
The focus shall include conservation, irrigation, ground water recharge, source sustainability,
rejuvenation of water bodies, watershed development and afforestation and the Illustrative
works include—
(i)
construction of canals, flood or diversion channels,check dams,gully plugs and
underground dykes;
(ii)
construction or rejuvenation of ponds, percolation tanks, recharge pits, recharge shafts,
injection wells and associated water harvesting structures;
(iii)
irrigation open wells, micro-irrigation channels and field water distribution systems;
(iv)
reclamation of community water logged land;
(v)
afforestation and plantation work linked with soil and moisture conservation; and
(vi)
rooftop rainwater harvesting and other decentralised recharge systems.
12 The Arunachal Pradesh Extraordinary Gazette, June 28, 2026
(b) Intended Outcomes—Strengthening of water security through integrated water resource
management, recharge and conservation for long-term climate resilience.
B.
Category II—Core Rural Infrastructure—
(a)
Thematic focus shall include core civic, social, governance and service - delivery infrastructure
relating to education, health, drinking water, sanitation, connectivity, renewable energy and
community services and the Illustrative works include—
(i)
construction or upgradation of rural roads, culverts, cross- drainage structures and village
connectivity facilities;
(ii)
construction of Gram Panchayat Bhawans, Anganwadi centres, rural libraries and other
public buildings;
(iii)
construction of school infrastructure, including kitchen sheds, additional classrooms,
laboratories, compound walls and playgrounds;
(iv)
crematoria and community infrastructure;
(v)
solid and liquid waste management assets, including stabilising ponds, community
sanitary complexes and waste segregation and collection centres;
(vi)
installation of solar lighting systems and other renewable rural energy infrastructure;
(vii) village parking areas, transport sheds and other common rural amenities;
(viii) rural housing works permissible under the schemes of the Central Government, including
those permitted under the Pradhan Mantri Awas Yojana—Gramin; and
(ix) repair and maintenance of works created under the Jal Jeevan Mission for ensuring
water supply.
(b)
Intended Outcome—Creation of foundational civic and social infrastructure ensuring basic
amenities, improved service access and enhanced quality of life in rural areas.
C.
Category III - Livelihood-related Infrastructure—
(a)
Thematic focus shall include productive assets and facilities that enhance rural livelihoods
through agriculture, livestock, fisheries, value addition, skilling and enterprise development
and the Illustrative works include—
(i)
construction of training-cum-skill development centres and work sheds for livelihood
activities;
(ii)
rural haats or weekly markets and other market infrastructure;
(iii)
food grain storage buildings, agricultural produce storage structures, cold storage units
and other agri-value chain infrastructure;
(iv)
buildings for Self Help Groups and federation-level institutions;
(v)
compost structures, including vermi compost and NADEP units;
(vi)
development of silvi pasture grasslands, dairy infrastructure and shelters for cattle,
goats, pigs, poultry and other livestock;
(vii)
fisheries- related infrastructure, including fish drying yards;
(viii) raising of nurseries and production of building material; and
(ix)
Integrated projects promoting circular and cyclical economy models, as may be approved
by the Central Government.
(b)
Intended Outcome—Strengthening of sustainable livelihoods, value addition, enterprise
development and self-reliant rural economies.
D.
Category IV - Special works to mitigate Extreme Weather Events and Disaster
Preparedness---
(a)
Thematic focus shall include disaster risk reduction, climate adaptation, and protection of
rural communities and assets from floods, cyclones, storms, droughts, landslides, forest
fires and other extreme weather events and the Illustrative works include—
(a)
construction of cyclone shelters, flood shelters and multipurpose disaster resilient
structures;
(b)
construction of diversion channels, embankments and other disaster-mitigation works;
(c)
stabilising ponds and water structures for flood management;
(d)
post-disaster rehabilitation, restoration and repair of rural roads and community assets;
(e)
wind break and shelter belt plantations; and
(f)
forest fire management works, including fire breaks, fuel buffer zones and allied measures.
The Arunachal Pradesh Extraordinary Gazette, June 28, 2026 13
(b)
Intended Outcome— Creation of climate-resilient villages capable of withstanding extreme
weather conditions.
3.
Any other public work which may be notified by the Central Government.
4.
Maintenance of rural public assets created under the Act.
Works for individual beneficiaries, including but not limited to housing - related works under the
Pradhan Mantri Awaas Yojana—Gramin, sanitation-related works and other beneficiary-oriented
developmental works undertaken under various schemes of the Central Government from time to
time and expressly notified for inclusion under the Scheme, may also be taken up. The eligibility
of such beneficiaries shall be as notified by the Central Government, aligned with the eligibility
criteria specified under the respective Central Government schemes, with all such works conforming
to the norms, standards and guidelines issued by the Central Government.
30.
Eligibility Criteria of the Beneficiary for Individual Beneficiary Work-
Without prejudice to the generality of the above, works creating individual assets as notified by the
Central Government shall be prioritised on land or homestead owned by households belonging to—
(a)
Arunachal Pradesh Scheduled Tribes;
(b)
nomadic tribes;
(c)
women-headed households;
(d)
households headed by persons with disabilities;
(e)
beneficiaries of land reforms;
(f)
beneficiaries under the Pradhan Mantri Awaas Yojana—Gramin (PMAY-G); and
(g)
beneficiaries under the Scheduled Tribes and Other Traditional Forest Dwellers (Recognition
of Forest Rights) Act, 2006 (2 of 2007), and after exhausting the eligible beneficiaries under
the above categories, works may be taken upon the lands of small or marginal farmers as
identified on the basis of criteria notified by the Central Government, subject to such conditions
as may be notified by the Central Government, including the requirement that such house
holds possess a valid job card and have atleast one adult member willing to work on the
project undertaken on their land or homestead.
CHAPTER XII - WORKSITE MANAGEMENT AND SAFETY
31.
Facilities at worksites :
1.
For the purpose of transparency at the worksite, the following shall be ensured—
(a)
there shall be a project initiation meeting in which various provisions of the work shall be
explained to the workers;
(b)
a copy of the sanction work order shall be available for public inspection at the worksite;
(c)
measurement record of each work and details of the workers shall be available for public
inspection;
(d)
a Citizens’ Information Board shall be put up at every worksite and updated regularly in the
manner specified by the Central Government;
(e)
the vigilance and Monitoring Committee setup according to the instructions of the Central
Government may check all works and its evaluation report will be recorded in the Works
Register in the format specified by the Central Government and submitted to the Gram
Sabha during the Social Audit.
2.
The facilities of safe drinking water, shade for children and periods of rest, first aid box with adequate
material for emergency treatment for minor injuries and other health hazards connected with the
work being performed shall be provided at the worksite.
3.
In case the number of children below the age of five years accompanying the women working at any
site is five or more, provisions shall be made to depute one of such women workers to lookafter
such children. The person so deputed shall be paid wage rate.
32.
Safety and accidents :
1.
If any personal injury is caused to any person employed under the Scheme by any accident arising
out of and in the course of his employment, he shall be entitled to such medical treatment as
required, free of cost.
2.
Where hospitalisation of the injured worker is necessary, the State Government shall arrange for
such hospitalisation including accommodation, treatment, medicines and payment of daily allowance
which is not less than half of the wage rate.
14 The Arunachal Pradesh Extraordinary Gazette, June 28, 2026
3.
If a person employed under the Scheme meets with death or becomes permanently disabled by
accident arising out of and in the course of employment, he or his legal heirs, as the case may be,
shall be paid by the implementing agency an ex-gratia as per entitlement under the Pradhan Mantri
Suraksha Bima Yojana or as may be notified by the Central Government.
4.
If any personal injury is caused by accident to a child accompanying a person who is employed
under the Scheme, such person shall be entitled to medical treatment free of cost; and in case of
death or disablement of the child due to the said accident, ex gratia shall be paid to the legal
guardians as determined by the State Government.
CHAPTER XIII - RESTRICTIONON UNDERTAKING WORKS DURING PEAK
AGRICULTURAL SEASONS
33.
Notification of Peak Agricultural Seasons :
4.
The State Government shall, in advance of each financial year, notify a period or periods aggregating
to sixty days in a financial year, covering the peak agricultural seasons of sowing and harvesting,
during which no works under the Scheme shall be undertaken.
34.
Area-Specific Notifications :
1.
The State Government may issue distinct notifications for different areas of the State, including
districts, blocks or Gram Panchayats, having regard to—
(a)
agro-climatic zones;
(b)
local patterns of agricultural activities ; and
(c)
such other relevant factors as may be considered necessary.
2.
Every notification issued under this provision shall have binding effect for the purposes of the Act
and the Scheme.
35.
Prohibition on Works during Notified Periods :
1.
All authorities responsible for planning, sanctioning or executing works under the Scheme shall
ensure that no work is undertaken during the periods notified as peak agricultural seasons.
36.
Scheduling of Works :
1.
The Programme Officer and other implementing authorities shall, while approving the aggregated
Viksit Gram Panchayat Plans and scheduling works, ensure that all works are taken up only
outside the notified peak agricultural seasons.
CHAPTER XIV - ESTIMATE, SANCTIONING AND WORK EXECUTION
37.
ESTIMATES :
1.
Technical Estimates and Standards for Works—Every work under this Scheme shall have a technical
estimate and design sanctioned by an authority authorised by the State Government, based on the
framework aligned with the Viksit Bharat National Rural Infrastructure Stack.
2.
For works involving construction, appropriate labour-intensive technologies, depending upon the
availability of labour and the use of local materials, shall be employed to the extent feasible.
3.
Bills of quantities shall use clear and commonly understood terminology to ensure transparency
for all stakeholders.
4.
Each work shall have a summary of the estimate, design and a technical note indicating the expected
outputs and outcomes.
5.
All technical estimates, designs and outcome notes shall be generated or uploaded through digital
systems integrated with the designated management information system.
38.
Administrative and Financial Sanctions :
1.
Works finalised at the Gram Panchayat level through the approved Viksit Gram Panchayat Plan
and aggregated at the Block and District levels shall be accorded administrative or financial sanction
by the competent authority as per the requirements and within thirty days.
2.
The sanctioning authorities shall ensure that—
(a)
the proposed works are drawn exclusively from the approved Viksit Gram Panchayat Plan;
(b)
Annual plans would be prepared on the basis of the normative allocation.
(c)
the works are consistent with thematic domains and the Viksit Bharat National Rural
Infrastructure Stack;
(d)
all sanctioned works are taken up through the designated digital portal under the Act.
The Arunachal Pradesh Extraordinary Gazette, June 28, 2026 15
39.
Wage Linkage to Output and Schedule of Rates :
The State Government shall ensure that wages without any gender bias are linked to the quantum of
work completed, in accordance with the Rural Schedule of Rates notified on the basis of time-and-
motion studies for different types of work and different seasons, and revised periodically.
40.
Special Schedule of Rates for Vulnerable Groups :
A separate Schedule of Rates shall be finalised for women, the elderly, persons with disabilities and
persons with debilitating ailments to facilitate their productive participation in suitable categories of work.
41.
Working Hours and Earning Norms :
1.
The Schedule of Rates shall be framed so that an adult person working for eight hours, inclusive of
one hour of rest, can earn an amount equivalent to the notified wage rate.
2.
Working hours of an adult worker may be flexible but shall not extend beyond twelve hours in a day,
including intervals for rest.
42.
Inspection and Quality Control :
The State Government shall ensure regular inspection and supervision of works by designation quality-
control teams to verify adherence to quality standards, accuracy of measurements and conformity of
wage payments to the actual quantum of work executed. Inspection reports shall be uploaded to the
management information system.
43.
Completion of Ongoing Works :
At the time of opening new works, it shall be ensured that ongoing or incomplete works are prioritised
for completion, subject to planning norms and the approved Viksit Gram Panchayat Plans.
44.
Execution Without Contractors :
1.
No contractor shall be engaged for the execution of any work or component financed through
expenditure under this Act. All such works shall be executed directly by the implementing agencies
in accordance with the processes laid down under the Scheme, including mandatory proactive
disclosures and the social audit process.
2.
In cases of convergence where components of a work are financed under other schemes, the
execution of those components may follow the norms of the converging scheme, including the use
of contractors where permitted.
3.
As far as practicable, works executed by the programme implementation agencies shall be performed
by using manual labour and no labour displacing machines shall be used.
45.
Transparent Procurement of Materials :
All materials required for the execution of works shall be procured by the Gram Panchayat or the
implementing agency through transparent procurement systems, including e-tendering processes, as
specified by the State Government.
CHAPTER - XV
FUNDING PATTERN AND FINANCIAL ARRANGEMENTS
46.
Funding Pattern :
1.
Centrally Sponsored Scheme : The Scheme shall be implemented as a Centrally Sponsored
Scheme.
2.
Cost Sharing between the Central Government and the State Government, the funding pattern under
the Scheme shall be 90 : 10 between the Central Government and the State Government of Arunachal
Pradesh.
47.
Financial Arrangements :
1.
State-wise Normative Allocation : The Central Government shall determine, for every financial
year, a State-wise normative allocation for implementation of the Scheme, based on such objective
parameters as may be communicated from time to time.
2.
Expenditure Beyond Normative Allocation: Any expenditure incurred by the State Government
over and above the State-wise normative allocation shall be borne by the State Government.
3.
Central Share : The share of the Central Government, within the approved allocation, shall include
expenditure towards-
16 The Arunachal Pradesh Extraordinary Gazette, June 28, 2026
(a)
payment of wages for unskilled, semi-skilled and skilled labour engaged under the Scheme;
(b)
the material component of works, subject to the provisions contained in Schedule -I ; and
(c)
such administrative expenses as may be specified by the Central Government, including-
(i)
salary and allowances of Programme Officers and supporting staff,
(ii)
administrative expenses of the Central Council,
(iii)
facilities required under Schedule - II,
(iv)
training and capacity building, and
(v)
such other items.
4.
State Share : The share of the State Government, within the approved allocation, shall include
expenditure towards-
(a)
payment of wages for unskilled, semi-skilled and skilled labour engaged under the Scheme;
(b)
the material component of works, subject to Schedule - I ; and
(c)
such administrative expenses as may be specified, including-
(i)
salary and allowances of Programme Officers and supporting staff,
(ii)
administrative expenses of the State Council,
(iii)
facilities required under Schedule - II,
(iv)
training and capacity buildings, and
(v)
such other items.
5.
Unemployment Allowance and Delay Compensation : The State Government shall bear the
expenditure towards unemployment allowance and delay compensation payable under the Scheme,
as per the provisions notified/issued by the State Government.
6.
Intra-State distribution of normative Allocation : The State Government shall, upon receipt of
the approved normative allocation from the Central Government, ensure equitable,need-based and
transparent intra-State distribution of the allocation across districts and Gram Panchayats, taking
in to consideration the categorisation of Gram Panchayats and the assessed local needs for
determining Gram Panchayat-wise allocations and corresponding district allocations; and the detailed
methodology, parameters and procedural requirements for such distribution shall be notified by the
Central Government.
7.
Out of the administrative cost of 9% permissible under the Scheme, 2% shall be retained at the
State level, 1% at the district level and the remaining 6% shall be utilized at the Block and Gram
Panchayat levels. Priority shall be accorded to clearing all pending salary liabilities before undertaking
any other administrative expenditure.
CHAPTER - XVI
TRANSPARENCY AND PUBLIC DISCLOSURE
48.
Proactive disclosure :
1.
Mandatory Public disclosure shall be undertaken through digital systems integrated with the
designated management information system and displayed at the village level for public scrutiny.
2.
Display at every worksite a “Janata Board” indicating details of the work, estimated labour days,
material quantities in local terminology and item-wise costs.
3.
Digital and physical display of number of days of employment provided, wage payments, material
payments guarantees under the Act, works approved under the Viksit Gram Panchayat Plan, and
year-wise works taken up or completed by the Gram Panchayat and other implementing agencies.
4.
Public disclosure of all information relating to works, labour demand, employment provided, payments,
material utilisation and physical progress under this Scheme shall be carried out through digital
systems integrated with the designated portal. Weekly disclosures shall be automatically generated
and displayed in a publicly accessible physical and digital formats. In addition, the Gram Panchayat
shall convene disclosure meetings to present the status of works, payments, grievances and other
relevant information before the community.
5.
District Programme Coordinator and Programme Officer shall ensure that their official websites are
regularly updated in compliance with clause (b) of sub-section (1) of Section 4 of the Right to
Information Act, 2005 (22 of 2005), with all information on the Act available in free, downloadable
electronic form.
The Arunachal Pradesh Extraordinary Gazette, June 28, 2026 17
6.
All accounts and records including muster rolls relating to the scheme shall be made available for
public scrutiny. Any person desirous of obtaining copies of records or relevant extracts thereof may
be provided such copies or extracts on request within seven working days from the date of receipt
of the application, on payment of the prescribed fee. The charges shall be levied at the rate applicable
under the Right to Information Act, 2005 and the rules framed thereunder, including the per-page
copying charges.
CHAPTER - XVII
SOCIAL AUDIT
49.
Conduct of Social Audit :
1.
All works, expenditures and guarantees under this Scheme shall be subject to social audit at least
once every six months.
2.
The procedure, standards and modalities for conducting social audits shall be as per the rules
notified by the Central Government.
3.
Until such rules are notified, the provisions of the Mahatma Gandhi National Rural Employment
Guarantee Audit of Schemes Rules, 2011 shall, mutatis mutandis, apply to the conduct of social
audits under this Act.
50.
Compliance with findings :
1.
Findings of the social audit shall be placed in the Gram Sabha.
2.
Corrective and recovery actions shall be initiated without delay.
3.
Action-taken reports shall be recorded in the MIS.
4.
Any misappropriation of amounts spent under the Scheme shall be recoverable under the relevant
revenue laws for recovery prevailing in the State.
5.
The portion of such recoveries pertaining to the Central share shall be remitted to the Consolidated
Fund of India through the mechanism established by the Central Government.
51.
Annual Reporting :
The District Programme Coordinator, the Programme Officer and each Gram Panchayat shall prepare
an annual report detailing facts, figures and achievements relating to the implementation of the Scheme
within their jurisdiction. A copy of such report shall be made available to the public in physical or
electronic form, on payment of such fee as may be specified in the Scheme.
CHAPTER - XVIII
GRIEVANCERED RESSAL AND OMBUDSPERSON
52.
Grievance Redressal Mechanism :
An effective grievance redressal mechanism shall be established under the Scheme, comprising the
following components, namely : -
1.
Institutional mechanisms for receiving grievances at the Gram Panchayat, Block and District levels,
with at least one designated day each week when officials shall be mandatorily available to receive
grievances;
2.
Every worker shall have an opportunity of being heard and register any grievance either orally or in
writing, at all implementation levels for disposal as per the provisions of the Grievance Redressal
Mechanism under the Scheme.
3.
Issuance of a dated acknowledgement for all grievances submitted in writing, telephonically, online,
or orally to any authorised functionary;
4.
Enquiry through spot verification or inspection and disposal shall be completed within seven working
days of receipt of the grievance;
5.
Upon completion of the enquiry, the concerned authority shall initiate immediate corrective action,
and the grievance shall be resolved within fifteen days;
6.
Failure to dispose of a grievance within a fortnight at the level determined, shall be treated as a
contravention of the provisions of this Act ;
7.
Where prima facie evidence of financial irregularity is revealed during preliminary enquiry or through
findings of the social audit report, the District Programme Coordinator shall, after obtaining legal
advice, ensure that a First Information Report is lodged and necessary proceedings initiated;
18 The Arunachal Pradesh Extraordinary Gazette, June 28, 2026
8.
The concerned authority shall inform the complainant in writing, physically or digitally, of the
conclusions of the enquiry and the steps taken for redressal;
9.
Action taken on grievances received by all implementing agencies shall be placed before the
meetings of the District Panchayat for review and monitoring;
10.
Appeals against the orders of the Gram Panchayat shall lie before the Programme Officer ; appeals
against the orders of the Programme Officer shall lie before the District Programme Coordinator;
appeals against the orders of the District Programme Coordinator shall lie before the State Grievance
Redressal Authority or any officer designated by the State Government;
11.
All appeals shall be filed within forty-five days from the date of the order;
12.
All appeals shall be disposed of within thirty days from the date of receipt;
13.
Any grievance not resolved within fifteen days at the Gram Panchayat, Block or District level shall
be automatically escalated to the next higher level through digital systems integrated with the
designated management information system and such escalations shall be continuously monitored
electronically.
53.
Record Maintenance and Grievance Redressal System :
The Block Development Office shall prepare and maintain, or cause to be prepared and maintained,
for each Gram Panchayat, such registers, vouchers and other documents in such form and in such
manner as may be specified in the Scheme containing particulars of Gramin Rozgar Guarantee Cards
and pass books issued, name, age and address of the head of the household and the adult members of
the households registered with the Gram Panchayat.
54.
Ombudsperson :
The State Government shall appoint an Ombudsperson for each District to receive grievances, conduct
enquiries and issue awards in accordance with the guidelines notified by the Central and the State
Governments. The Ombudsperson shall operate through digital platforms integrated with the designated
digital portal under this Act.
CHAPTER - XIX
MONITORING, INSPECTION AND EVALUATION
55.
Monitoring :
1.
The State Government shall monitor implementation at State, District and Block levels.
2.
Dashboards and analytical reports shall be maintained in the MIS.
56.
Inspections :
A minimum prescribed percentage of works at each level shall be inspected every year.
(a)
At Gram Panchayat Level -100% of works executed during the year shall be inspected.
(b)
At Block Level - At least 60% of works executed indifferent Gram Panchayats of the respective
Block shall be inspected.
(c)
At District Level - Atl east 10% of works executed in different Gram Panchayats of the respective
District shall be inspected.
(d)
At State Level - At least 2% of works executed in different Gram Panchayats across the State shall
be inspected.
57.
Evaluation :
1.
Independent evaluations shall be undertaken periodically to assess outcomes and impact.
2.
For ensuring measurable outcomes and real-time accountability, technology-enabled monitoring
shall be mandated for tracking work execution and post-completion asset outcomes, supported by
verified data systems and spatial technologies. Weekly public disclosures shall be reinforced through
a comprehensive transparency framework. A Concurrent Evaluation Mechanism as specified by the
Central Government, shall provide continuous vigilance and enable timely corrective action.
The Arunachal Pradesh Extraordinary Gazette, June 28, 2026 19
CHAPTER - XX
TRAINING AND CAPACITY BUILDING
58.
Training and Capacity Building :
1.
The State Government shall prepare and implement a dedicated plan for capacity building and
strengthening of Panchayati Raj Institutions for effective planning, execution,supervision and monitoring
of the Scheme.
2.
The capacity-building plan shall, inter alia, include activities relating to :
(a)
training of elected representatives and functionaries of Panchayati Raj Institutions on roles and
responsibilities under the Scheme;
(b)
Information, Education and Communication (IEC) initiatives to enhance awareness regarding
the provisions of the Scheme,transparency mechanisms and community participation;
(c)
digital literacy and orientation on the use of Management Information Systems, geo-tagging
tools and other digital platforms;
(d)
strengthening institutional systems in Panchayati Raj Institutions for record keeping, financial
management, grievance redressal, social audit and asset maintenance.
3.
The plan shall be prepared annually, based on field requirements, and shall be integrated with the
State Training and Capacity Building framework under the Scheme.
4.
State Institute of Rural Development and Panchayati Raj shall extend full cooperation in organising
such capacity-building initiatives and shall ensure participation of elected representatives and
functionaries.
5.
The State Government may also designate any agencies, institutes, educational institutes to prepare
capacity building and training plan with IEC activities.
6.
Expenditure on activities undertaken under this provision shall be met from permissible administrative
and capacity-building heads, as may be specified by the Central Government and the State
Government.
CHAPTER - XXI
AMENDMENTS, REPEAL AND SAVINGS ETC
The State Government of Arunachal Pradesh, by notification, shall have power to make any amendments,
modification, addition, alteration, deletion and abolition of and to this Scheme and Schedules as and when
necessary.
CHAPTER - XXI
CLOSING FORMULA
This Scheme shall be read harmoniously with the provisions of the Act. In the event of any inconsistency,
the provisions of the Act shall prevail.
Secretary
Rural Development Department,
Government of Arunachal Pradesh,
Itanagar.
—————
Published and printed by Directorate of Printing and Stationery, Naharlagun.—499/2026-DoP-250-6-2026.