GOVERNMENT OF ASSAM
ORDERS BY THE GOVERNOR
OFFICE OF THE GUWAHATI METROPOLITAN DEVELOPMENT AUTHORITY
NOTIFICATION
The 19th August, 2019
GMDA/GEN/13/2009(Pt)/2011/70.- In exercise of the powers conferred by Section 39 (1)
of GMDA Act 1985 (Amended) GMDA is pleased to publish the following notice regarding the
publication of the draft Development Scheme for the Pamohi/Dhalbama special scheme area of the
Master Plan 2025 notified as development area vide Notification No. GMDA/GEN/13/2009/Pt/70
13 dated 3rd March 2010 and as described in the Schedule-I.
Notice for publication of the draft Development Scheme of Pamohi/Dhalbama special
scheme area of Master Plan 2025 :
It is notified that the detailed Development Scheme prepared under Section 35(1) for the
Pamohi/Dhalbama special scheme area is hereby published.
The details of the Development Scheme together with all relevant papers and maps may
be inspected free of cost during office hours at the Office of the Chief Executive Officer,
Guwahati Metropolitan Development Authority and will also be available in GMDA's
website: http://www.gmda.gov.in.
Objections/suggestions from any person are invited with respect to the scheme within 2
(two) months from the date of issue of notification.
’¸˜ 1±Ê√¬ÛS
THE ASSAM GAZETTE, EXTRAORDINARY, AUGUST 29, 2019
1612
SCHEDULE- I
1.
SITUATION AND AREA :
(i)
District
:
Kamrup Metropolitan
(ii)
Approximate area:
3.963 Sqkm.
2.
Mouzas and Villages included in this special scheme area of Guwahati Master Plan 2025:
Mouzas
Villages
Area
Beltola
Dhalbama
0.848 Sqkm.
Pamohi
Ramcharani
3.115 Sqkm.
Total area of development Scheme
3.963 Sqkm.
INTRODUCTION
The Master Plan and Zoning Regulation for Guwahati was published vide the Assam Gazette
Extraordinary Notification No. 198 Dispur, Thursday, 9th July 2009 and Corrigendum No. 199
Dispur, Friday, 10th July 2009 and Corrigendum No. 62 Dispur, Tuesday, 16th March,2010.Certain
modification has also been made in the Master Plan from time to time considering the requirement
of such modifications due to needs of plan development.
As per the Master Plan 2025 land use classification of the Special Scheme Area covering
Pamohi and Dhalbama village were indicative only with the final land use to be notified at the time
of finalization of Development Scheme. Accordingly, no specific land use was earmarked in the
Special Scheme Area covering Pamohi and Dhalbama village except in some portion of Pamohi
village which have been earmarked as Eco-Sensitive Zone to keep conformity with the adjoining
Eco-Sensitive Zone. The total area of this Development Scheme is about 3.965 sq.km.
As per the Master Plan the Pamohi village of this Special Scheme Area falls in sub planning
unit 13 of planning unit 5 while village Dhalbama falls in sub planning unit 17 of planning unit 2.
The estimated population by 2025 in sub planning unit 13 is 34,997 while in sub planning unit
17 is 67,191. But actual population of these two villages is accounts for only 08 to 01 percent. The
estimated population of this Development Scheme by 2035 is estimated at 11,492.
In Chapter-14 of Master Plan implementation the city has been divided into IV parts for the
purpose of development/re-development and this area falls in Part-II where large undevelopment
areas are available for new development and as such detail land use is now required to be finalized
with development control regulation considering this area as a development area under GMDA Act
as has been emphasized in the Master Plan.
THE ASSAM GAZETTE, EXTRAORDINARY, AUGUST 29, 2019
Accordingly, under Section 35 (i) this area of Pamohi and Dhalbama was declared as
development area vide Notification No. GMDA/GEN/13/2009/13 dated: Guwahati the 3rd March
2010 (Annexure-I) and also issued a notice vide GMDA/GEN/13/2009/17 dated 3rd March 2010
(Annexure-II) inviting names of all the claimants of any interest in the land within the area under
this scheme area. Petition received to a examined and a notification for Development Scheme for
Pamohi-Dhalbama special scheme area was published on 19th January 2011.Subsequently it was
felt that the existing development and the area being located on the edge of some most sensitive
areas of city, further survey of existing land use was required and carried out by the Authority. And
based on the field survey a new Development Scheme was finalized for this area and published
again inviting suggestion and obligation for finalizing. To make the plan more user friendly and
transparent the whole plan was also converted into GIS platform. Some provisions of land use
zoning and new provision of development control regulation were also incorporated to accommodate
the requirement of new policies of Government with respect to urban development.
SCOPE AND CONTENT OF DEVELOPMENT SCHEMES :
The scope and content of Development Scheme has been framed in accordance with clause
36(1) of GMDA Act by making provision for following matters. The area being bordering Rani
and Garbhanga reserve forest and in the vicinity of Deepor Beel special measures has to be taken
in a Development Scheme.
(i)
Layout of new streets or roads with provision for proposed right of way of different
category of road.
(ii)
The allotment or reservation of land for different uses.
iii)
The preservation and protection of the sensitive uses like hills and waterbodies and
channels.
(iv)
Imposition of condition and restrictions in regard to open space percentage of building
area for a plot, character of building allowed in different areas, discontinuance of
objectionable uses etc.
(v)
The requirement for housing schemes of different income group, commercial uses
schools and hospitals community facilities and other uses allowed.
(vi)
Identification of major drainage channels.
(vii)
Other matters not inconsistent with the objective of the Act.
Major highlight of this proposed Development Scheme of Pamohi and Dhalbama :
(1)
The land use plan so drawn up is finalized considering the trend of development and
the land use earmarked in the adjoining area of the Master Plan.
All Govt. land in the scheme area to be transferred to GMDA for the purpose of
preservation as a recreation area or for various residential/infrastructure project as per
this Development Scheme.
(2)
No change or modification of layout of road network as suggested in the Master Plan
has been proposed. However, it is proposed that all the local distributors should have
a minimum RoW (Right of Way) of 12 m and access road should have a minimum
RoW of 6 m.
1613
THE ASSAM GAZETTE, EXTRAORDINARY, AUGUST 29, 2019
(3)
The FAR in plots abutting roads less than 6 m has been restricted to 100. However
additional FAR is proposed if land is relinquished for widening the road without asking
for compensation of land.
(4)
Residential areas have been earmarked as Residential (High) and Residential (Low)
with FAR & Coverage have been restricted in Residential (Low) zone.
(5) Population and Density :
Population density of the scheme area is only about 873 persons per sq.km.as against the
density of 3745 persons per sq.km. of GMA in 2011.This area has a potential of future development
because of its well accessibility with other areas of the city, though some areas of Pamohi required
to be put in restricted use because of its proximity to Deepor Beel. The decadal growth from 2001-
2011 is 66.7% which is also very high compared to the 37% decadal growth of Guwahati city for
this period. Accordingly the total population in 2025 is about 11492.
POPULATION ESTIMATE OF SCHEME AREA
Year
Population
Source
2001
2311
Census of India
2011
3461
Census of India
2025
7692
Estimated.
2035
11492
Estimated.
(6) Housing for the poor :
(a)
In order to prevent growth of slum mandatory provision of EWS (Slum Ratio) in all
group housing to the extent of 20% of dwelling units on the plot with additional FAR
of 15% of permissible FAR.
(b)
Re-categorization of housing types, development control norms and different densities
to make EWS/LIG housing viable ad economical.
(c)
Facilitating for Construction of PMAY Housing Under the Mission "Housing For All
By 2022"
(7)
Environment is taken as a major concern and as such considering the proximity of
major portion of this area to the Deepor Beel, no industrial area has not been proposed
in this developmental scheme.
(8)
Special provision has been made for development in existing villages.
(9)
Provision has been made for retaining traditional weekly market.
(10) Transport :
No modification is proposed in the transport sector. It is important to establish the interface
between the intra GMA and intra region road system and also to define the path for regional traffic.
1614
THE ASSAM GAZETTE, EXTRAORDINARY, AUGUST 29, 2019
Accordingly the proposed road network as proposed in final Master Plan 2025 for this area has
been retained. However some adjustment of Right of Way (RoW) of various category of road has
been proposed as given below with minimum right of way : ( Annexure V)
Most of the existing road network do not have sufficient width and required widening. Only
5.5% of total land is under roads. As such minimum width of access roads are proposed as 6m and
other Master Plan roads have been proposed 9m-24m, so that land under road is kept at 10-12%.
(I)
(1) Peripheral Ring Road
-
24 m
(2) Radial Master Plan Road
-
18 m
(3) Local Distributors
-
(a) 12 m
(b) 9 m
All other access roads will have a minimum right of way of 6m
(II)
The planning of residential neighbourhood regarding circulation system shall be governed
by the following norms :
(1)
The residential plots in new areas shall generally face an open space including
pedestrians' movement with a minimum width of 9 m. The plots may face a
vehicular access road with 9m right of way. The circulation network within the
cluster shall be so devised that no residential plot is more than 65 m away from
the nearest point of the vehicular access road.
(2)
All vehicles shall be restricted to specific parking lot or along the vehicular
access road.
(3)
Maximum length of cul-de-sac shall be 150 m and loop road 450 m.
(III)
The planning of residential neighbourhood regarding landscaping shall be governed by
the following norms :
(1)
Suitable landscape plans for the residential area shall be prepared indicating in
reasonable detail, the landscape development of the parks and roadside plantation.
(2)
Detail landscape plan for one Neighbourhood Park shall be prepared.
The Master Plan roads are shown in maps at Annexure No. II
(11) Land Use of Scheme Area :
The details of existing and proposed land use of scheme area are given in maps at annexure IV
& VII. The proposed land uses proposed in various zone are given below.
The Pamohi Dhalbama area is on the border of Rani-Garbhanga reserve forest on its south and
Deepor Beel on west and Pamohi reserve on north. Considering these sensitive nature of location
about 45% of land has been kept under eco-sensitive zone to check undesired development near
these areas. 20% of land has been in kept in the low density zone considering the rural nature of
development. No area has been proposed as industrial zone but cottage handloom and household
industries primarily rural based shall be allowed in some zones.
1615
THE ASSAM GAZETTE, EXTRAORDINARY, AUGUST 29, 2019
(12)
Land Use Zoning
There is no change in land use zoning and classification of land use zones, land use
permissibility (Refer Chapter 13 of final Master Plan 2025 for Guwahati) in different zones as
notified in the final Master Plan 2025.
However following modifications and additions (As marked '*' in Table-I) to these provisions
have been incorporated in this land use permissibility of different zones of this development area.
1616
THE ASSAM GAZETTE, EXTRAORDINARY, AUGUST 29, 2019
1617
THE ASSAM GAZETTE, EXTRAORDINARY, AUGUST 29, 2019
1618
THE ASSAM GAZETTE, EXTRAORDINARY, AUGUST 29, 2019
1619
THE ASSAM GAZETTE, EXTRAORDINARY, AUGUST 29, 2019
1620
THE ASSAM GAZETTE, EXTRAORDINARY, AUGUST 29, 2019
1621
THE ASSAM GAZETTE, EXTRAORDINARY, AUGUST 29, 2019
1622
THE ASSAM GAZETTE, EXTRAORDINARY, AUGUST 29, 2019
Index of Use Zones :
R (H) - Residential High
R (L) - Residential Low
C - Commercial
P - Public & Semi Public
T - Transportation
1623
THE ASSAM GAZETTE, EXTRAORDINARY, AUGUST 29, 2019
G - Green Belt (Recreational and Open Space)
E - Eco Sensitive
CI - Composite Use I
NOTE :
1.
All Existing non nuisance, non-polluting uses to continue in the following use zones :
-
Residential
-
Commercial
-
Public/Semi-public
-
Transportation and Communication
-
Composite Use I
All existing non nuisance, non-polluting uses may be allowed to continue/discontinue
after an application for special permission to the Authority in the following use zones :
-
Recreational, Commercial, Public/ Semi Public & Green Belt
-
Eco-Friendly.
-
All notified forest, water bodies, rivers and upto a distance of 100m from their boundaries
etc. are also classified as Eco-Sensitive Zone with other Eco-sensitive areas. No construction
be allowed in this area.
2.
To be permitted in commercial areas to be indicated in Residantial(H) Zones in Local
Area Plans/ Layout Plans
3.
In Residential use zone, existing uses to continue and new ones to come on special
permission from the Authority Also refer Annex I
4.
No further expansion of residential area
5.
In the New Town proposed Recreational Area
6.
Only Existing uses to continue
7.
Only those industries as listed in Annex I
13. Parks, parking, circulation and utilities can be located in any of the use zones. In recreation
and eco-sensitive zone, these would be permissible with special permission from the
Authority.
14. The following activities shall be permitted only in Eco-Friendly Zone and not in Eco-
Sensitive Zone
-
Tourism
-
Socio-cultural activities
-
Bungalow type construction
-
Integrated PMAY
-
Residential Dwelling Low Income Group, PMAY Scheme
1624
THE ASSAM GAZETTE, EXTRAORDINARY, AUGUST 29, 2019
Development of land would be permitted in Eco-Friendly Zone, if an integrated land
development proposal is submitted. Such proposal should primarly be a PMAY Scheme upto 70%
PMAY housing with 35% coverage and 125 FAR in a plot more than 0.5 Ha.
15. To the maximum of 30 percent of the FAR is allowed
n1
Maximum coverage of 25% and maximum FAR of 50 provided the area is not notified
as water bodies forest etc. with minimum plot size of 2000sq.m. with maximum two due
dual units.
n2
A roadside hotel designed primarily for motorists, typically having the rooms arranged in
low blocks with parking directly outside with 25% coverage & 50 FAR. Provided area is
not notified as water bodies, forest etc. & only on plots along NH & peripheral ring roads.
n3
In Green Belt/Eco friendly zone it is allowed on Peripheral road by pass and peripheral
ring road as a high way amenity.
n4
Maximum coverage of 25% and maximum FAR of 50 with Assam Type structure in areas
not notified water bodied forest etc.
n5
Maximum coverage of 40% and maximum FAR of 100 on the plot along National Highway
and peripheral ring roads.
n6
Only ground basement.
NOTE : For interpretation of land use zoning and development control regulation Authority may
constitute a committee of experts if such situation arises. The committee may also be
given the task of elaborate and add on the above land use permissibility considering the
circumstances that may come from time to time in the process of implementation of the
plan for subsequent approval of Authority however, any land use change recommended
by this committee will require approval of government.
(13) Housing
New Housing for Urban Poor
New housing should be in the form of one or two room units, which would be developed
through public and private agencies and through Cooperative Societies or in PPP mode. As this
category constitutes bulk of the housing stock that has to be catered at an affordable price to the
lowest income bracket as housing for Economically Weaker Sections (EWS), this is often done by
cross-subsidization.
For this purpose, adequate land would be earmarked for EWS housing. The developers of
group housing shall ensure that minimum 20% of the dwelling units, are constructed for Community-
Service Personnel/EWS and lower income category. In old built up areas, this may be as
redevelopment schemes or industrial housing, etc., whereas, in urban extensions, the acquisition
and development cost of this land should be borne by rest of the project. Such reserved lands
should be handed over to a designated agency for promoting housing for low income and weaker
sections.
1625
THE ASSAM GAZETTE, EXTRAORDINARY, AUGUST 29, 2019
The pattern of EWS housing shall be such as to ensure optional utilization of land in a
sustainable manner. For that purpose, multi-storied housing will be the preferred option. Apart
from mandatory provision for EWS housing in all group housing projects/schemes, the primary
responsibility for creating adequate stock of housing for urban poor shall be borne by public
agencies, which can be considered in PPP mode.
The following guidelines with site-specific relaxations may be adopted as required. Regular
monitoring of executed schemes and revision of these guidelines at the time of preparation of new
schemes is essential. Group housing norms shall be applicable with the following conditions :
(i)
Minimum plot size 2000 sq.m. (facing a minimum road of 9 m)
(ii)
Maximum density-300 units per ha + 10% variation, on residential component of the
land.
(iii)
The scheme should be designed in a composite manner with an overall maximum FAR
of 230 on the residential component of the land and FAR on the remunerative component
of the land shall be as applicable for the relevant land use.
(iv)
Mixed land use/commercial component up to 10% of permissible FAR in the residential
component of the land.
(v)
The minimum residential component of the land area for rehabilitation of squatters has
to be 60% and maximum area for remunerative use has to be 40%.
(vi)
Area of dwelling unit for rehabilitation shall be around 31 to 34 sq.m. for EWS and
42 sq.m. to 48 sq.m. for LIG.
(vii)
Common parking is to be provided which can be relaxed wherever required, except for
the parking for remunerative purpose.
(viii)
No restriction on ground coverage (except set backs).
(ix)
Schemes shall be approved by concerned local body.
(x)
Schemes/designs should be compatible for disabled.
(xi)
For Housing constructed under PMAY under the mission "Housing for all by 2022" ala
the benefits offered by Govt. including amendment of byelaws for facilitating
construction of such housing of EWS,LIG will be available. All housing project were
35% of the house are EWS category or individual housing under EWS a detailed in
guidelines of such scheme 2015 and subsequent amendments will be available for such
benefits.
(14)
Villages
The villages in this area have undergone significant physical and functional transformation
related with their specific location. Villages are characterized by a mix of different land uses and
have similarities in compact built form, narrow circulation space and low-rise high-density
developments. These mainly accommodate residential, commercial and industrial uses and function
1626
THE ASSAM GAZETTE, EXTRAORDINARY, AUGUST 29, 2019
as a mix. It is important that these areas, which are already established with identified uses,
continue to play an active economic role.
Comprehensive schemes for the development of villages should be prepared by the concerned
local bodies with the aim of provision of optimal facilities and services within the abadis and
integration with the surrounding areas. Towards the latter objectives, development along the
peripheries of the villages should be carefully planned, wherever necessary for the provision of
services and green/open areas, circulation etc. this aspect should also be kept in view while
preparing layout plans for urban extension areas.
The Authority should identify these areas where maximum coverage of 60% and FAR 125
with maximum Ground + 1st floor be allowed even if these villages fall within Recreational and
Open area and Eco-friendly Zone.
(15)
Weekly Markets
Weekly market, which is the traditional style of retail shopping, is quite popular in Guwahati
especially among the lower and middle-income groups. These markets are held in various areas.
Further, parking and other open spaces within the service markets and commercial centers should
be so planned that weekly markets can operate in these areas. The specific locations and timings
of operation of such markets should be specified and regulated by the concerned local body.
(16)
Land Use Zoning and Development Control Regulation
16.1
Minimum Setbacks
The provision of minimum setbacks of the building or structure from the proposed
street line for different sizes of plots for all categories of use shall be as per the
following table.
1627
THE ASSAM GAZETTE, EXTRAORDINARY, AUGUST 29, 2019
NOTE :
i.
In case the permissible coverage is not achieved with setbacks, the setbacks of the
preceding category may be allowed.
ii.
The setback requirement in the plot will be as per the setback prescribed in the
Building Byelaw for GMDA in force for the time being. But the minimum requirement
of setback shall not be less than the minimum setback proposed in table 14.1 for
different plot size.
iii.
These provisions of setbacks are subject to requirements of height and ventilation
as per Building Byelaws.
iv.
In case a layout is sanctioned with more than the minimum prescribed setbacks, the
same shall be followed in the sanction of the building plans.
v.
The Authority could relax setbacks in special circumstances. However, the reason
for relocation should be clearly recorded and approved by competent Authority.
17.0
Parking Standards
Parking as per existing byelaw of Guwahati Metropolitan Area enforced.
1628
THE ASSAM GAZETTE, EXTRAORDINARY, AUGUST 29, 2019
1629
.
THE ASSAM GAZETTE, EXTRAORDINARY, AUGUST 29, 2019
1630
THE ASSAM GAZETTE, EXTRAORDINARY, AUGUST 29, 2019
1631
THE ASSAM GAZETTE, EXTRAORDINARY, AUGUST 29, 2019
ANNEXURE-I
OFFICE OF THE
GUWAHATI METROPOLITAN DEVELOPMENT AUTHORITY
BHANGAGARH :: GUWAHATI-781005
NOTIFICATION OF DECLARATION AND PUBLICATION OF PAMOHI/DHALBAMA
AS A DEVELOPMENT AREA
Dated : Guwahati the 3rd March, 2010
GMDA/GEN/13/2009/13.- In exercise of the power conferred by Section 35 (1) of GMDA
Act 1985 (Amended) the GMDA is pleased to declare the Pamohi/Dhalbama area described in
the schedule-I which is given below as a Development Area for preparing a Development Scheme
for this area for implementing the proposals contained in the Master Plan for Guwahati 2025.
It is notified that the notification and declaration of Development Area by Authority under
Section 35 of the GMDA Act 1985 (amended) for the area described in the Schedule-I and shown
in Map is hereby published for subsequent preparation of detail scheme.
Accordingly restrictions have been imposed as per provision of Section 44 of GMDA Act
within the Development Area described in the Schedule-I below on the use and development of
land and building including regulation of open space and such other matters not inconsistent with
the object of this Act except with prior approval of the Authority in the manner prescribed in the
Act.
Details of the notified development area including a broad land use of this area may be
inspected free of cost during office hours at the Office of the Chief Executive Officer, Guwahati
Metropolitan Development Authority and will also be available on payment and in GMDA's
website: http://www.gmda.co.in.
SCHEDULE-I
1. District
:
Kamrup Metropolitan
2. Sub-Division
:
Guwahati
3. Area
:
Revenue Village Pamohi and Dhalbama
Sd/-
Chief Executive Officer
Guwahati Metropolitan Dev. Authority
Bhangagarh, Guwahati-5
1632
THE ASSAM GAZETTE, EXTRAORDINARY, AUGUST 29, 2019
ANNEXURE-II
OFFICE OF THE
GUWAHATI METROPOLITAN DEVELOPMENT AUTHORITY
BHANGAGARH :: GUWAHATI-781005
No. GMDA/GEN/13/2009/17 Dated : Guwahati the 3rd March, 2010
N O T I C E
In exercise of the powers conferred by Section 35 (3) of Guwahati Metropolitan
Development Authority Act, 1985 (Amended), the Guwahati Metropolitan Development Authority
invites the names of all the claimants and their interest on any land or building within the area
under the Special Scheme Area of Pamohi/Dhalbama as described in the Schedule-I of notification
issued vide GMDA/GEN/13/2009/13 dated: 03/03/2010 which may be seen in GMDA's website:
http://www.gmda.co.in along with objections and suggestions, if any, within a period of two
months from date of issue of the notification declaring this area as a "Development Area" under
the Act. This is required to prepare and finalize the development scheme of the Pamohi/Dhalbama
area as per Guwahati Metropolitan Development Authority Act, 1985 (Amended).
Sd/-
Chief Executive Officer
Guwahati Metropolitan Dev. Authority
Bhangagarh, Guwahati-5
1633
THE ASSAM GAZETTE, EXTRAORDINARY, AUGUST 29, 2019
ANNEXURE-III
Classification of industries
Cottage, Handloom and Household Industries
1.
Cosmetic Products
2.
Agarbatti
3.
Writing Ink
4.
Sealing Wax
5.
Watch, pen and spectacles repairing
6.
Acrylic Sheet Button
7.
Plastic Covers (Diary and Files etc.)
8.
Knitted Plastic Bags
9.
Shoe repairing and manufacturing
10.
Rubber stamps
11.
Rubber moulded goods
12.
Food Products - bakeries etc.
13.
Creamery and dairy products
14.
Atta Chakki and Masala Grinding
15.
Repacking of Medicines etc.
16.
Paper Products
17.
Card Board Boxes, paper Bag making
18.
Book binding
19.
Printing Press
20.
Ready Made Garments
21.
Batik Printing
22.
Embroidery
23.
Watch Straps (Nylon)
24.
Canvas Bags and Products
25.
Hosiery Items
26.
Surgical Bandages
27.
Shoe Laces etc.
28.
Thread Reels
29.
Tailor labels
30.
Mirror and frame making
31.
Decorative Glass articles
32.
Chalk Sticks
33.
Tailor's Shop
34.
Cycle repairing
35.
Basket Masking
36.
Wire Brushes
37.
Umbrella Assembly
38.
Wooden Toys
39.
Paper pins, Gem clips
40.
Hair Pins
41.
Wire Staples
42.
Wire stands for kitchens
43.
Wire for Curtains
44.
Wire loops
45.
Decorative Key Rings
46.
Link Clips
47.
File Clips
48.
Shoe and Tent Eyelets
49.
Brass Jewellary
50.
File cover accessories
51.
Garment hooks and eyes
52.
Link chain
53.
Heating element (for domestic electrical
appliances)
54.
Decoration lighting series
55.
Transistor radio Covers
56.
Decorative Leather Goods
57.
Industrial Leather Hand Gloves
58.
Manufacture of Bidi
59.
Processing of Supari
60.
Laundry, dry cleaning and dyeing
61.
Cotton cloth weaving in handlooms
62.
Ivory Carving
63.
Metal Polishing
64.
Gold and silver thread, Zari work,
Jewellary, Gold Ornaments
65.
Manufacturing, repairing and Tuning of
musical instruments
66.
Making of lac bangles
67.
Repairing of Electronic Instruments
68.
Assembly of Furniture Units
1634
THE ASSAM GAZETTE, EXTRAORDINARY, AUGUST 29, 2019
1635
THE ASSAM GAZETTE, EXTRAORDINARY, AUGUST 29, 2019
1636
THE ASSAM GAZETTE, EXTRAORDINARY, AUGUST 29, 2019
ANNEXURE-VI
Proposed area distribution under Pamohi & Dhalbama revenue villages
Sl.
Landuse Zones
Area (In ha.)
Area (%)
No.
1
Commercial
11.10
2.80
2
Composite Use-1
6.87
1.73
3
Drain/Channel/River
20.29
5.12
4
Eco-Sensitive
181.59
45.83
5
Public & Semi-public
6.91
1.74
6
Recreational
17.99
4.54
7
Residential High
62.23
15.71
8
Residential Low
68.33
17.24
9
Road (Existing Width)
20.91
5.28
Total
396.22
100
1637
THE ASSAM GAZETTE, EXTRAORDINARY, AUGUST 29, 2019
Guwahati : Printed and Published by the Dy. Director (P & S), Directorate of Printing & Stationery, Assam, Guwahati-21.
Extraordinary Gazette No. 725 - 10 + 10 - 29 - 08 - 2019. (visit at– dpns.assam.gov.in)
MOLOY BORA,
Chief Executive Officer,
Guwahati Metropolitan Dev. Authority,
Bhangagarh, Guwahati-5.
1638