REGD. NO. D. L.-33004/99
The Gazette of India
EXTRAORDINARY
PART III—Section 4
PUBLISHED BY AUTHORITY
No.
27]
NEW DELHI, WEDNESDAY, FEBRUARY 20, 2002/PHALGUNA 1, 1923
570 GI/2001
(1)
2
THE GAZETTE OF INDIA: EXTRAORDINARY
(PARTH^-SK:.41
3
4
THE GAZETTE OF INDIA : EXTRAORDINARY
[PARTII^SK:.4]
5
6
THE GAZETTE OF INDIA : EXTRAORDINARY
[PARTII^-SBC.4]
7
8
THE GAZETTE OF INDIA : EXTRAORDINARY
[PARTII^-SBC.4]
V
570 G1/2002—2
10
THE GAZETTE OF INDIA: EXTRAORDINARY
[PART1I^-SEC,4]
11
TARIFF AUTHORITY FOR MAJOR PORTS
NOTIFICATION
New Delhi, the 20th February, 2002
No. TAMP/75/2001-JNPT.—In exercise of the powers conferred by Section 48 orthe Major Port Trusts Act, 1963
(38 of 1963), the Tariff Authority for Major Ports hereby disposes of the proposal of the Jawaharlal Nehru Port Trust for
approval of procedure and charges for inter-tcrminal handling of transhipment containers at the Jawaharlal Nehru Port
Terminal and the Nhava Shcva International Container Terminal Limited as in the Order appended hereto.
12
THE GAZETTE OF INDIA : EXTRAORDINARY
[PAKI 111—SB_\ 41
SCHEDULE
Case No.TAMP/75/2001-JNPT
The Jawaharlal Nehru Port Trust (JNPT)
Applicant
O R D E R
(Passed on this 19th day of February 2002)
This case relates to the proposal received from the Jawaharlaf Nehru Port Trust
(JNPT) for fixation of charges for inter-terminal handling of transhipment containers at the container
terminal of the Jawaharlal Nehru Port Trust (JNPT) and the Nhava Stieva International Container
Terminal Limited (NSICT).
2.1.
This Authority had earlier (July 99) received a representation from M/s. Shrey^s
Shipping Limited (SSL) stating that the transhipment cost for containers arriving either at the JNPT or
at the NSICT but loaded at the other terminals was double the existing rates as the NSICT and JNPT
were treated as separate entities for charging the rate applicable for transhipment.
2.2.
The representation of the SSL was processed as per the procedure adopted. At the
joint hearing relating to that case, it was decided that the SSL would give the agreed text describing
interim arrangement installed. The SSL had detailed the following procedures as an interim
arrangement currently in operation:
(i).
Transhipment containers would be unloaded in a separate yard and subsequently
'house kept' for concerned mainline vessel.
(ii).
Transhipment containers received from mainline vessels to be feedered to other
neighbouring ports would be loaded on the feeder vessel.
(in).
After finishing the operations, the feeder vessel would shift to the other Terminal to
continue the same operations.
(rv).
Transhipment containers would be loaded on mainline vessel depending upon the
mainline vessel operators' request.
(v).
Port would charge the composite transhipment charges, as notified to main shipping
line.
The detailed procedure of the interim arrangement submitted by the SSL was
forwarded to the NSICT and the JNPT for their comments.
,? 3.
The Authority had considered the representation and passed an Order on 19 July
2000 approving the procedure in operation at the JNPT and the NSICT for movement of transhipment
of containers. Based on the suggestion made by the JNPT, it was also decided that the existing
practice would continue till any operational problem arose requiring further intervention in the matter
by this Authority.
3.1.
In its present proposal, the JNPT has made the following points:
(i).
In response to the representation from M/s. Shreyas Shipping Limited for deciding the
inter terminal charges for transhipment containers, the TAMP vide its order No.
TAMP/69/99-JNPT dated 20 May 2000 has stated that the charges towards mter-
terminal handling of transhipment containers may be worked out by the concerned
terminals after arriving the consensus with the users operating at respective
terminals. (In facMhis Authority did not pass any Order in this regard on 20 May 2000
as mentioned by the JNPT. The Order was passed by this Authority on 19 July 2000
which was notified in the Gazette on 8 August 2000. In this Order, this Authority did
not require the JNPT or the NSICT to work out a consensus proposal for mter-
terminal transfer charges for transhipment containers).
13
(ii).
Efforts were made to have a dialogue with Shipping Lines and common working
procedure has been arrived by the two terminals i.e., JNPT & NSICT* This procedure
has been agreed to by the CSLA & MANSA.
.,,-•••
(ni).
The following procedure and proposed charges are submitted for approval:
(A).
Handling of Transhipment (TP) containers:
(a).
TP container discharged at the JNPT and ,b,ound to be loaded at the
NSICT shall be transported by the JNP TTis and the JNP RTGCs will
discharge these containers in the NSICT yard of 4G.
,,.' i --
(b).
Similarly, TP container discharged at the NStGT<->and bound to be
loaded at the JNPT shall be discharged by the NSICT by using its
RTGCs and TTs in CY31 of the JNPT.
(B).
Charges for handling of TP Containers:
(a).
If a container is discharged by the JNPT and loaded by the NSICT at
its terminal, in that case the charges will be as under:
50% of JNP TP handling charges as per JNPT Tariff shall be
charged to the Line by the JNPT.
1 1 .
For the same container the NSICT shall charge 50% of TP
handling charges as per its Tariff + Rs.1300/-(for 20') or, Rs.
1950/- (for 40') to its Line.
(b).
If a container is discharged by the NSICT and loaded by the JNPT at
its terminal, the charges will be as under:
The NSICT shall charge 50% of handling charges to the line
as per its Tariff.
For the same container the JNPT shall charge 50% of TP
handling charges as per the Tariff + Rs. 13Q0/-(for 20') or Rs.
I950/-(for40')tothe Line.
(c).
NSICT will be additionally charging the Lines an amount equivalent to
royalty paid to JNPT as per the licensee agreement i.e., Rs. 52/- per
TEU till 2
July 2001 and Rs. 153/- per TEU from 3rd July 2002.
(d).
The above procedure shall come into force, on trial basis for a period
of two years with effect form 20 April 2001 to 14 April 2003 and shall
be reviewed after six months.
3.2.
The JNPT has given the following justifications for the proposed additional charge of
Rs1300/- (for 20' containers) and Rs 1950 (for 40' containers):
(i).
The transhipment containers meant for both the terminals will be stored in separate
yard having common yard facility.
(ii).
Lift on, transportation and lift off are being done by the respective terminals by
deploying their handling equipments.
(iii).
The break-up of Rs. 1300/- is, lift on-Rs. 400/-; transportation - Rs.50QA; and, lift off -
-Rs.400/-.
(iv).
The component of Rs. 400/- is taken from the existing scale of rates of JNPT for lift
on / lift off activity [Schedule-II; Section-1; I .(iv)] of the scale of rates.
14
THE GAZETTE OF INDIA ; EXTRAORDINARY
IPARTIII—SEC. 41
(v).
The component of Rs.500/- towards transportation is derived considering the cost of
transporting the containers with the help of terminal tractor trailers and on the basis of
Scale of Rates under Scheduie-n, Section-]; 7.(i), which specifies that Rs.1700/- per
TEU will be charged for "shifting of containers within the terminal for custom
examination or for any other purpose and subsequent loading of container for
delivery" Thus, in this operations lift on, lift off and lift on components are involved.
Therefore, if Rs.12007- towards lift on, lift off & lift on are deducted from Rs.1700/-, a
balance of Rs.500/- is left for transportation. Taking into account these, charge of Rs.
1300/- towards housekeeping as proposed Is Justified and already available in Scale
ofRatesofJNPT.
(vl).
The proposed additional charge of Rs.1300/- has been accepted by the CSLA &
MANSA.
(vii).
The main intention through this working procedure is to attract more transhipment
cargo and to develop the JNPT as main transhipment hub on the west coast.
3.3.
The JNPT has also stated that the working procedure of the proposed charges has
already been made effective from 20 April 2001. It has admitted that there was, however, some
procedural delay in sending the proposal to this Authority. The JNPT has, therefore, requested that
the Authority to accord approval for the working procedure and proposed charges for inter-terminal
transhipment containers between the JNPT and the NSICT with effect from 20 April 2001.
4,
The JNPT was requested to explain the circumstances warranting revision of the
procedure already prescribed by this Authority in its Order dated 19 July 2000. The comments in this
regard received from the JNPT are summarised below:
(i).
The procedure prescribed was an internal arrangement on the basis of a request
made by M/s. Shreyas Shipping Limited who are operating the services for
transhipment containers. Subsequently, there are other main line operators who also
started transhipment from the JNPT and the NSICT which necessitates revision of the
earlier procedure.
(ii).
Other Shipping Lines who operate main line vessels, have shown interest to have
transhipment of containers separately from both the terminals i.e. JNPT & NSICT.
They have requested the Port to have common procedure for transhipment to avoid
calling of vessels at both the terminals separately which takes more time. Moreover,
the Lines have opined that such transhipment containers to be handled by both the
terminals require separate yard and equipment so as to have smooth and faster turn
around of vessels with least cost.
(iii).
It was, therefore, decided with consensus of the CSLA & MANSA that a revised
procedure be followed. Accordingly, a composite inter terminal handling charges
have been fixed.
(iv).
The new procedure has avoided the delay in connecting transhipment containers
which was hitherto be carried out by shifting of vessels from one terminal to other
terminal or to treat the containers separately as import and export and charge the
Shipping Lines accordingly.
This was causing more cost for Shipping Lines for
connecting TP containers from respective terminals. The revised procedure which
has come Into force from 28.4.2001 has given good results and the shipping Lines
who are operating are also satisfied with this procedure and in agreement with
payment of composite charges as indicated in the revised procedure.
5.
The proposal of the JNPT was initially circulated to the Nhava Sheva International
Container Terminal Limited (NSICT), M/s. Shreyas Shipping Limited, Indian National Shipowners'
Association (INSA), and Shipping Corporation of India Limited (SCI). The proposal was initially not
15
circulated to MANSA and CSLA as the comments of these organisations were forwarded by the JNPT
along with its proposal. The Comments received are summarised below:
Container Shipping Llnei Aaaoolatlon (CSLA1
(i).
The Lines are entirely supportive of the fact that a mechanism has been arrived at to
facilitate this movement and endorse the proposal of the JNPT.
(ii).
While the transhipment rates appear cheaper than some adjacent ports, there is
further scope to provide mort competitive rates as some cost elements notably
royalty appear to have been double counted.
Mlumbal and Nhava-She va Ship Agent*' Aifoclatlon, (MANSA.)
(I).
It welcome- agreement between the two terminals and also agrees with the tariff
proposed.
Shipping Corporation of ln.o"ia Lin,,t-,J.<£Q.t)
(i).
The proposal submitted by the JI ( n ir. agreed to in principle. We trust that the
NSICT will also concur in the proposal ;.„ ,!-r» ittai.
• vo^es both the terminals.
(ii).
Since this will Involve additional cost to the Lines and as th»; *r« land-side costs, the
Lines will have to recover these additional costs from the Trade. Similar arrangement
exists In the port of Colombo also. But there the Inter Terminal Transfer (ITT) is
either arranged by the terminal or if the Lines carry out the ITT, the Lines get rebate
for due amount. We, therefore, feel that the concerned terminals shall bear the cost
of ITT between themselves.
(iii).
In addition to ITT charges, the NSICT terminal will also be charging Royalty at the
rate of Rs.52 per TEU till 2 July 2001. The amount of royalty of Rs.153 per TEU is
stated to start from 3 July 2002. This appears to be a typographical error. The
charge of Rs.153 per TEU may be applicable from 3 July 2001 and not 2002.
(Iv).
The amount of Royalty may not remain the same after 3 July 2001 and It will keep on
increasing as per the agreement between the JNPT and the NSICT. If it is so, then,
this amount Is likely to go up to around Rs. 7000 in the 30th year.
M/». Shrevas Shipping limited
(I).
Inter-terminal movement of container is a part of the overall transhipment operation
carried by a Port and assigning an additional cost which is approximately 30% of the
tariff for transhipment Is a very stiff proposition and will put the Jawaharlal Nehru Port
at a disadvantage for attracting transhipment traffic out of Indian Ports if the two
vessels are not calling at the same terminal.
(ii).
The CSLA and the MANSA have endorsed this proposal. As one of the only two
operators whose ships carry 100% transhipment containers only, It Is our experience
that no Line Is willing to bear any additional inter - terminal cost for containers brought
In the JNPT as Imports Into or export out of the country.
(ill).
The Lines while choosing a feeder service to a particular hub port give substantial
welghtage to the total transhipment cost Incurred by them at a port. In such case, for
a vessel having a through put of more than 400 TEU, the only option is either call
both terminals which have been found to be not a practical solution due to various
operational constraints or deploy two separate vessels dedicated to one terminal.
(iv).
Unless the JNPT successfully demonstrates its role of having successfully fulfilled
transhipment requirement of traffic from ports in India, it will not be able to stake its
claim for its capability of holding a status of an International transhipment hub.
16
THE GAZETTE OF fisfblA : EXTRAORDINARY
IPARTHI—SEC. 41
(v).
Major cost 6lem|hfhas,already been considered and together with the fact that the
traffic is on the rise/There is, therefore, no justification for seeking additional revenue
up to 30% of the total norr^a^harg^for^r^irig^pperafc^g, the cost of which to a
large extent has already ^eh^cccrnmodaTecf wwirtCTeasmg the Scale of Rates of
both the terminals. . ,, . ,b, ^
irj ^ , ! o q q i j P ^ , n 9
£t!S e o r .
(vi).
Inter terminal trucking operations does not really put a'dditfonal monetary burden for
the two terminals and,mM§t,,tf\.ereIore^.j3,e^gp,t,Bjt; the minimum level to allow users
make use of this facility,
.
*'
„
' ,^ ,,,
6.
While forwarding a copy of the "proposal for its comments, the NSICT was also
requested to specifically clarify the reasons for proposing to levy separately an amount eauivalent to
royalty payable to the JNPT, when the tariff itself hras been fixed after considering royalty payment as
a cost element. The reply received from the NSICT, is summarised below:
(i).
Before introducing the working procedure, the NSICT and the JNPT were handling
the containers which were discharged.at one terminal and loaded from other terminal
after necessary shifting was cafried out by the Shipping Lines/terminals.
(ii).
The Authority publishes tariff for each individual terminal separately and not for two
terminals together. The charges as per approved tariff, which are arrived at after
considering the royalty costs for handling the box, were as under:
At JNPT Terminal for 20 ft box
At NSICT Terminal for 20 ft box
Shifting charges for internal terminal
Transfer
Total Handling costs
20 ft box
I
Rs. 3,000
Rs.3,480
~r"1
Rs. 1,700
Rs. 8,180
40 ft box
Rs. 4,500
Rs. 5,220
Rs,2,550
Rs.12,270
(in).
The cost, based on the notified tariff, was not found viable by the Lines, when they
required to discharge at one Le:i.iinal and ic-id from another. Thus, a representation
was made to the JNPT and the' NSICT ic arrive at some working arrangement at
reduced costs.
(iv).
Based on the discussions with JNPT and to accommodate the requests of the trade,
the NSICT has indicated that it can consider handling the container at half the tariff
provided the JNPT agrees to waive the royalty payment for this activity which is in
interest of the Port and the Trade. Since it was not possible for JNPT to alter the
terms of Licence agreement, it was decided to agree on the proposed working
procedure with approval of CSLA and MANSA, provided they were ready to accept
the royalty element as part of the subsidised tariff.
(v).
Based on above proposal the revised tariff for the box is as under:
At JNPT Terminal for 20 ft box (1/2
rate)
At NSICT Terminal for 20 ft box (1/2
rate}_
Royalty recovery
Shifting charges for internal v
•: •-•
Transfer
Total Handling costs
Cost Saving s to Lines
20 ft box
Rs. 1,500
Rs.1,740
•~
Rs 15?
Rs,
1,3-JC
Rs. 4,693
Rs. 3,487
40 ft box
Rs. 2,250
Rs. 2,610
Rs.306
Rs.7.116
Rs. 5,654
17
It may be noted that the tariff for transhipment is actually 50% of the local tariffs and
they are further discounted to the tune of 20% based on volumes. This makes
transhipment rates very unattractive to the terminal operator.
(vi).
The mutually agreed tariff is much less than the tariff approved by the TAMP and
there is no question of double counting the costs. Since the tariff charged to the
Lines is much lower than the TAMP approved tariff, there is no need to have the
hearing on the matter.
(vii).
The NSICT has gone out of its way to try and accommodate the requests of the
Lines, keeping in mind the overall benefit to the Trade, The calculations above show,
these adjustments have been made at a considerable pecuniary loss to NSICT. It,
however, appears that the Lines are still not satisfied with the proposal and, therefore,
we will withdraw this proposal and continue accepting such traffic at the original
notified tariff as shown in (ii) above.
7.
The proposal of the JNPT was not initially circulated to Bombay Chamber of
Commerce and Industry (BCCI) and Indian Merchant Chamber (IMC) earlier as they were not
consulted when the original representation of M/s. Shreyas Shipping Limited relating to transhipment
charges for containers arriving at JNPT and the NSICT was considered. M/s. Shreyas Shipping
Limited have now informed that M/s. Shahi Shipping Limited are also engaged in carriage of
transhipment container. It was, therefore, decided to consult BCCI, IMC and M/s. Shahi Shipping
Limited also. A copy of the proposal of the JNPT was forwarded to BCCI, IMC and M/s. Shahi
Shipping Limited on 27 September 2001 for comments. Their Comments have not been received.
8.
A joint hearing in this case was held on 12 October 2001 at the office of the JNPT in
Mumbai. At the joint hearing, the following submissions were made:
The Jawaharlal Nehru Port Trust (JNPT)
(i).
In the earlier arrangement there was no ITT.
(ii).
Transhipment vessels had to shift from the JNPT to the NSICT by paying necessary
shifting charges.
(iii).
MLOs have started bringing transhipment containers in big vessels.
The earlier
system of berthing at the centre was not convenient. Formal shifting was necessary.
(iv).
Only 50% of tariff is proposed and, therefore, there is a saving in this,
(v).
There is a saving in shifting charge also as indicated by the NSICT.
(vi).
The rate for ITT works out to Rs.1700/-. We have deliberately reduced to Rs.1,300/-
to help the transhippers.
M/s. Nhava Sheva International Container Terminal Limited (NSICT)
(i).
Transportation charge is a notified charge. It is, therefore, not a new item.
(ii).
Shifting charge is not a notified item. But, we are required to do a lot of work. The
charge is reasonable and, therefore, justified.
(iii).
Royalty is being charged exactly as per the concession agreement.
(iv).
M/s. Shreyas Shipping Limited are bringing two separate
vessels - one for each
terminal. Let them continue to do so.
(v).
If the ITT arrangement as proposed cannot be accepted then the NSICT will not like
to get involved in ITT at all.
18
"
THE GAZETTE OF INDIA: EXTRAORDINARY
(PARTHI-^SEC.4]
(vi).
M/s. Shreyas Shipping Limited brings containers from the KandlaPort. They have a
contract at Kandla to carry a box and deliver it at a particular terminal. It Is their
contractual obligation. For their own convenience and planning benefit, they want the
Terminal to adjust. They have to wait for berths to be available. They want to cut
short and save costs and reduce the turn around time at our cost.
(vii).
We may have 100 boxes for the JNPT and 200 boxes for the NSICT and 200 boxes
from the JNPT and 100 boxes from the NSICT. This can not be done easily. We
have to shuttle back and forth, which is very expensive. Hence, the emphasis on ITT.
(viii).
The 50% concession given has not attracted traffic.
The Mumbai and Nhava-Sheva Ship Agents' Association (MANSA)
(i).
The ITT system is beneficial to all. Why can not Transhipment Lines agree?
(ii).
In ITT, extra movement is involved and hence the extra transportation cost (one
horizontal and one lifting extra will be there).
(iii).
The shifting charges are paid by the Lines. Why are transhippers upset? They have
no locus standi.
The Container Shipping Lines Association (India) fCSLAI
We endorse the views expressed by the MANSA.
M/s. Shrevas Shipping Limited
(i).
They say that the charge proposed is for the benefit of transhippers. This is not
evident.
(ii).
The NSICT says that weekly growth of ITT cases is 22 containers.
If properly
encouraged this traffic can grow more.
(iii).
The Government says that everything must be done to develop the JNPT as a 'hub'.
How can they now say that transhippers are not concerned?
(iv).
Lines pay shifting charge which is not correct. Lines refuse to bear the burden.
(v).
The TAMP recently allowed concession to vessels of a particular size calling at the
TPT. Please do so here also to encourage transhipment containers.
(vi).
If this can not be done, we will have to shift to some ports in the Middle East.
9.
With reference to the totality of information collected during the processing of this
case, and bearing in mind the arguments advanced at the joint hearing, the following position
emerges:
(i).
The earlier procedure of shifting of vessels between the two terminals, viz. the JNPT
and the NSICT, to discharge / load transhipment containers was approved by this
Authority keeping in mind the fact that it was then in operation for more than a year at
both the terminals. Since, it was recognised that the procedure adopted might not be
a permanent solution, the earlier Order had clearly indicated that the procedure would
continue only till any operational problem arose. The JNPT has now brought out the
need to review the earlier procedure for movement of transhipment containers. It has
been pointed out that the Shipping Lines prefer to avoid shifting of vessels between
the terminals and also like to have a separate yard for storage of transhipment
containers so as to shorten the turn around time of vessels.
It has also been
highlighted that the earlier procedure followed resulted in higher cost of handling
transhipment containers to the Lines (perhaps, due to payment of shifting charges)
when compared with the procedure suggested now.
It is noteworthy that the
19
procedure suggested now has already been put into operation by the JNPT since
April 2001. It has been reported that the procedure in operation has produced the
desired results; and, the Lines are also satisfied with the procedure adopted. In this
backdrop, this Authority does not have any reservation to endorse the revised
procedure for inter terminal handling of transhipment containers at the JNPT and the
NSICT.
(ii).
In the revised procedure adopted, there is no shifting of vessels between the
terminals. It envisages storage of tianshipment containers landed in a designated
yard "by one terminal and to be handled by the other terminal with its equipment in the
loading cycle.
Even though shifting of vessel is avoided, extra movement of
containers in the yard, as explained by both the JNPT and the NSICT, has become
inevitable in the revised procedure.
In this context, the terminal operators have
sought an additional tariff to cover the cost incurred towards extra movement of
containers.
(iii).
The CSLA and the MANSAA have fully endorsed the proposal. The SCI and the SSL
have opposed the proposed inter terminal transfer charge. Both the SCI and the SSL
have argued that the inter-terminal transfer cost must be borne by the concerned
terminals. The logic of this argument is not discernible. It has clearly emerged that,
in such cases, the terminals have to undertake extra lift-on, transportation and lift-off
activities. The existing composite rates for handling transhipment containers were
fixed with reference to the activities involved in handling them within the same
terminal.
At that time, the scenario of handling transhipment containers at one
terminal in the landing cycle and at the other in the loading cycle was not envisaged;
and, hence, the composite rate was not computed by including the cost of additional
movements of containers arising in such a situation. That being so, it cannot be said
to be unreasonable for the terminal operators to seek recovery of additional tariffs to
cover the cost of additional movements involved. As correctly pointed out by the
NSICT, the procedure adopted now provides benefit to the Lines which otherwise
would have waited for berths to be available at one terminal considering the fact that
it is a contractual obligation for the Lines to deliver the containers at a particular
terminal. This revised procedure, as again pointed out by the NSICT, will reduce the
turn around time of vessels and thereby result in cost saving to the Lines. When the
Lines will reap the benefit of the procedure adopted by both the terminals, it is not
reasonable for them to expect the terminal operators to provide additional services
required to achieve the benefits free of cost.
The point made by the SSL about a concession allowed by this Authority for mainline
vessels calling at the Tuticorin Port Trust (TPT) is not relevant in the context of the
transhipment containers handling under consideration in this case. In any case, the
concession allowed at the TPT is subject to a minimum throughput condition which is
protected by a bank guarantee arrangement prescribed. In the instant case, there is
no minimum throughput assurance sought from the Lines.
(Iv).
The proposal envisages levy of 50% of the transhipment container handling charges
as per the notified rate by each of the terminal and an additional charge for extra
movement of such containers by the terminal performing the activities in the loading
cycle. There cannot be any objection to the terminals levying 50% of the applicable
notified composite rate for handling transhipment containers, as services to that
extent are provided by them. This Authority is, therefore, inclined to approve this
component of the tariff proposed.
(v).
As has already been mentioned, in the procedure adopted now, there are additional
movements involved. These additional movements appear to be required for shifting
the transhipment containers stored in the designated yard after landing, for vessel-
wise stacking in the loading cycle. The additional handling is indicated as one lift-on,
transportation, and one lift-off operations. Even though there are no separate rates
prescribed for individual components of container handling activities in the Scales of
Rates of both the JNPT and the NSICT, the JNPT has attempted to derive such rates
from the approved rates. The methodology adopted by the JNPT is found to be
20
THE GAZETTE OF INDIA : EXTRAORDINARY
[PART III—Sir. 4]
reasonable. The rates for additional movements, derived from the existing tariffs,
work out to Rs.130u/~ (for 20' containers) and Rs. 1950/- (for 40' containers) in the
case ot fr 3 JNPT. This Authority, therefore, approves these rates for the JNPT as
proposed.
(vl).
In the case of the NSICT, the proposal envisages recovery of an amount equivalent
to the royalty payable by it to the JNPT in addition to levy of charges for the additional
movements / operations. It is noteworthy that the charges for additional movements /
operations proposed for the NSICT are the same as those proposed for the JNPT. It
may be relevant here to recall that the Scales of Rates approve^ for the JNPT and
the NSICT are different. In November 2000, this Authority approved a 16% increase
in tariffs for the NSICT.
The revised tariffs were approved duly taking into
consideration the royalty payable by the NSICT to the JNPT in the tariff computation.
That being so, this Authority cannot subscribe to the procedure sought to be adopted
by the NSICT of recovering royalty payable as actuals, which, if allowed, will be
nothing but double counting.
As mentioned earlier, the proposed charges for the additional movements involved
are derived from the Scale of Rates of the JNPT; and, the NSICT's Rates for
container handling are 16% higher than those at the JNPT.
Applying the
methodology followed by the JNPT for deriving the proposed charges, in the NSICT
case the charges for lift on / off will be Rs. 464/- (for 20' container). Since the rate for
shifting of containers within the terminal has not been revised in the case of the
NSICT at the time of November 2000 revision, it still continues to be at the same level
as that of the JNPT. It is, therefore, reasonable to consider a tariff of Rs. 500/- for
transportation in the case of the NSICT also. Thus, the tariff for additional movement
in the case of the NSICT works out to Rs. 1428/- (for 20' container) and Rs. 2142/-
(for 40' container). That being so, this Authority decides to disallow the proposal of
the NSICT levying an amount equivalent to the royalty payable as actuals and instead
approves revised inter terminal transfer charge of Rs. 1428/- (for 20' container) and
Rs.2142/- (for 40' container) in the case of the NSICT.
The revised rate approved for the NSICT is higher than that of the JNPT. It is to be
recognised that the rate fixed by this Authority is only a 'ceiling' in the case of Private
Terminal Operators. That being so, the NSICT has the option to operate the revised
rate approved at the level of the JNPT rates, if it decides to do so for commercial
reasons.
(vii).
The JNPT has introduced the revised procedure from 20 April 2001 and, accordingly,
has sought approval of the proposed charges with retrospective effect. The JNPT
has also explained that it had only introduced the revised procedure but withheld
billing for such services rendered at the proposed rates till a formal approval is
accorded by this Authority. It is commendable that the JNPT has (commendably)
changed its earlier approach of introducing new tariff arrangements through trade
notices and instead chosen to fall in line with the tariff setting arrangement envisaged
in the Statute.
None of the users, excepting the SCI and the SSL, who have in fact
objected to the introduction of a separate inter terminal transfer charge, has raised
any objection about introducing the revised procedure and the tariff arrangement with
retrospective effect. Be that as- it may, the earlier procedure of shifting of vessels has
been discontinued with the introduction of the revised procedure thereby resulting in a
direct saving of shifting charges payable by the Lines. That being so, this Authority is
inclined to approve the revised procedure and the charges for inter terminal transfer
of transhipment containers between the JNPT and the NSICT with retrospective
effect from 20 April 2001.
21
10.1.
In the result, and th for the reasons given above, and based on a collective
application of mind, this Authority approves the following procedure and charges for inter terminal
transfer of transhipment containers between the JNPT and the NSICT:
(i).
Procedure for handling transhipment (TP) containers:
(a).
TP containers discharged at the JNPT and bound to be loaded at the NSICT
will be transported by the JNP TTs; and, the JNP RTGCs will discharge these
containers in the NSICT yard of 4G.
(b).
Similarly, TP containers discharged at the NSICT and bound to be loaded at
the JNPT will be discharged by the NSICT by using its RTGCs and TTs in
CY31 of the JNPT.
(ii).
Charges for •, "idling TP Containers:
(a).
If a containei is discharged by the JNPT and loaded by the NSICT at its
terminal, the charger- w,!1 'oe zs under:
50% of transhipment r,ontanr- handling charges as per the JNPT
Scale of Rates will be charged to tne L, • hv the JNPT.
For the same container the NSICT will onarge 50% of the
transhipment container handling charges as per its Scale of Rates
and, in addition, also levy a charge of Rs.1428/- (for 20') or Rs. 2142/-
(for 40') towards inter-terminal transfer.
(b).
If a container is discharged by the NSICT and loaded by the JNPT at its
terminal, the charges will be as under:
The NSICT will charge 50% of transhipment container handling
charges to the Line as per its Scale of Rates.
For the same container the JNPT will charge 50% of TP handling
charges as per its Scale of Rates; and, in addition, also levy a charge
of Rs. 1300/- (for 20') or Rs. 1950/- (for 40') towards inter-terminal
transfer.
10.2.
This Authority also approves the procedure and charges mentioned at paragraph
10.1 above with retrospective effect from 20 April 2001.
10.3.
The JNPT and the NSICT are directed to include these provisions accordingly in their
Scale of Rates.
S, SATHYAM, Chairman
[ADVT/ffl/rV/143/2001/E\1y.]
Printed by the Manager, Govt. of India Press. Ring Road, Mayapuri, New Delhi-110064
and Published by the Controller of Publications. Delhi-110054.