okf.kT; vkSj m|ksx ea=ky;

ladYi

ubZ fnYyh] 9 vDrwcj] 2013

dkñvkñ 2301-—ued ds fofuekZ.k ds fy, iês ij nh xbZ

ued vk;qDr ds iz'kklfud fu;a=.k okyh dsanz ljdkj dh Hkwfe ds

iês ds uohuhdj.k laca/kh uhfr ij fopkj fd;k x;k rFkk ljdkj ds

ladYi lañ 18¼4½59&ued ¼Hkkx&VIII½] fnukad 7@12@1961 esa

vkaf'kd la'kks/ku djrs gq, rFkk ljdkj ds ladYi lañ

16¼23½@63&ued] fnukad 19@12@1969 ds rgr bls vkSj Li"V

djrs gq,] jk"Vªifr fuEufyf[kr dk vuqeksnu iznku djrs g®%—

¼d½ dsanz ljdkj dh Hkwfe fufonk vkeaf=r djds 20 o"kks±

dh vof/k ds fy, ued fofuekZ.k gsrq iês ij nh tk,xhA

¼[k½ iês dk uohuhdj.k ug… fd;k tk,xkA ued fofuekZ.k

ds fy, Hkwfe iznku djus gsrq ubZ fufonk vkeaf=r dh

tk,xhA ekStwnk iês ds lekIr gksus ij orZeku iêsnkj

u, fufonkdrkZvksa ds lkFk fufonk esa Hkkx ys ldrk gSA

[lañ 04014@1@2012&ued]

lathouh rkEg.ks] mi lfpo

MINISTRY OF COMMERCE AND INDUSTRY

RESOLUTION

New Delhi, the 9th October, 2013

S.O. 2301.—The policy on the renewal of leases of

Central Government land under the administrative control

of Salt Commissioner leased out for manufacture of salt

was considered and the President, in partial modification

of the Government Resolution No. 18(4)/59-Salt (Pt. VIII)

dated 7th December, 1961 and further clarified under

Government Resolution No. 16(23)/63-Salt dated 19th

December, 1969, is pleased to approve that:—

(a)

Central Government land will be leased out for

salt manufacture for a period of 20 years by

invitation of tender.

(b)

No renewal of lease will be done. Fresh tender

for the assignment of land for salt manufacture

will be called. The present lessee on expiry of

the existing lease may participate along with

fresh aspirants.

[No. 04014/1/2012-Salt]

SANJIVANI TAMHANE, Dy. Secy.

jftLVªh la- Mh- ,y- (,u) 04@0007@2003µ05

REGD. NO. D. L. (N) 04/0007/2003—05

izkf/dkj ls izdkf'kr

PUBLISHED BY AUTHORITY

lkIrkfgd

WEEKLY

la- 43]

ubZ fnYyh, vDrwcj 20—vDrwcj 26 2013] 'kfuokj@vkf'ou 28—dk£rd 4] 1935

No. 43]

NEW DELHI, OCTOBER 20—OCTOBER 26, 2013, SATURDAY/ASVINA 28—KARTIKA 4, 1935

Hkkx esa fHkUu i`"B la[;k nh tkrh gS ftlls fd ;g i`Fkd ladyu ds :i esa j[kk tk lds

Separate Paging is given to this Part in order that it may be filed as a separate compilation

Hkkx II—[k.M 3—mi&[k.M (ii)

PART II—Section 3—Sub-section (ii)

Hkkjr ljdkj ds ea=kky;ksa (j{kk ea=kky; dks NksM+dj) }kjk tkjh fd, x, lkafof/d vkns'k vkSj vf/lwpuk,a

Statutory Orders and Notifications Issued by the Ministries of the Government of India

(Other than the Ministry of Defence)

4387 GI/2013

(6115)

6116

THE GAZETTE OF INDIA : OCTOBER 26, 2013/KARTIKA 4, 1935

[PART II—SEC. 3(ii)]

miHkksDrk ekeys] [kk| vkSj lkoZtfud forj.k ea=ky;

¼miHkksDrk ekeys foHkkx½

¼Hkkjrh; ekud C;wjks½

ubZ fnYyh] 15 vDrwcj] 2013

dkñvkñ 2302-—Hkkjrh; ekud C;wjks fu;e] 1987 ds fu;e 7 ds mifu;e ¼1½ ds [kaM ¼[k½ ds vuqlj.k esa Hkkjrh; ekud C;wjks

,rn~}kjk vf/klwfpr djrk gS fd ftu Hkkjrh; ekudksa ds fooj.k uhps vuqlwph esa fn, x, g® os LFkkfir gks x, g®%&

vuqlwph

Øe

LFkkfir Hkkjrh; ekud¼dksa½ dh la[;k] o"kZ vkSj

u;s Hkkjrh; ekud }kjk

LFkkfir frfFk

la[;k

'kh"kZd

vfrØfer Hkkjrh; ekud

vFkok ekudksa] ;fn dksbZ gks]

dh la[;k vkSj o"kZ

1

IS 1515% 2013

IS 1515%1988

31 vxLr] 2013

e/kqeD[kh isfVdk & fof'kf"V ¼pkSFkk iqujh{k.k½

2

IS 1735 (Part 2): 2013

e/kqeD[kh isfVdk dk LV®M & fof'kf"V

IS 1735 (Part 2) % 1978

31 vxLr] 2013

Hkkx 2 fLFkj izdkj ¼nwljk iqujh{k.k½

3

IS 14133: 2013

'kgn fudkyus okys O;fDr dk fdV & fof'kf"V

IS 14133 % 1994

31 vxLr] 2013

¼igyk iqujh{k.k½

4

IS 5960 ¼Hkkx 11½% 2013

IS 5960 ¼Hkkx 11½% 1988

30 flracj] 2013

ekal ,oa ekal mRikn & ijh{k.k i)fr

Hkkx 11 Xywdksuks&MsYVk&ysDVksu dh ek=k Kkkr

djuk ¼igyk iqujh{k.k½

bu ekudksa dh izfr;ka Hkkjrh; ekud C;wjks] ekud Hkou] 9] cgknqj 'kkg tQj ekxZ] ubZ fnYyh&110002] {ks=h; dk;kZy;ksa % ubZ fnYyh]

dksydkrk] psUubZ] eqEcbZ] p.Mhx<+ rFkk 'kk[kk dk;ky;ksa % vgenkckn] caxykSj] Hkksiky] Hkqous'oj] dks;Ecrwj] xqokgkVh] gSnjkckn] t;iqj]

dkuiqj] ukxiqj] iVuk] iw.ks rFkk dksfp esa fcØh gsrq miyC/k g®A

[lanHkZ ,Q,Mh@th&128]

dqekj vfuy] oSKkkfud ^,Q* ,oa izeq[k ¼[kk| ,oa d`f"k½

MINISTRY OF CONSUMER AFFAIRS, FOOD AND PUBLIC DISTRIBUTION

(Department of Consumer Affairs)

(BUREAU OF INDIAN STANDARDS)

New Delhi, the 15th October, 2013

S.O. 2302.—In pursuance of Clause (b) of sub-rule (1) of Rule 7 of the Bureau of Indian Standards Rules, 1987, the

Bureau of Indian Standards hereby notifies that the Indian Standards, particulars of which are given in the Schedule hereto

annexed have been established on the date indicated against each:

¹Hkkx II—[k.M 3(ii)º

Hkkjr dk jkti=k % vDrwcj 26] 2013@dk£rd 4] 1935

6117

SCHEDULE

Sl. No.

No. and Year of the Indian Standard

No. and Year of Indian

Date of

Standards, if any, Superseded

Establishment

by the New Indian Standard

1.

IS 1515 : 2013

Beehives-Specification (Fourth

IS 1515 :1998

31 August, 2013

revision)

2.

IS 1735 (Part 2): 2013

Beehives stand-Specification (Part 2

IS 1735 (Part 2) : 1978

31 August, 2013

Fixed type (Second revision)

3.

IS 14133 : 2013

Beekeeper's Kit-Specification (First

IS 14133 : 1994

31 August, 2013

revision)

4.

IS 5960 (Part 11) : 2013

Meat and Meat Products- Methods of

Test Part 11 Determination of

IS 5960 (Part 11) : 1988

30 September, 1013

glucono-delta-lactone content (First

revision)

Copy of these standards are available for sale with the Bureau of Indian Standards, Manak Bhavan, 9 Bahadur Shah

Zafar Marg, New Delhi-110002 and Regional Offices : New Delhi, Kolkata, Chandigarh, Chennai, Mumbai, and also Branch

Offices: Ahemdabad, Bangalore, Bhopal, Bhubhneshwar, Coimbatore, Guwahati, Hyderabad, Jaipur, Kanpur, Nagpur, Patna,

Pune and Kochi.

[Ref. FAD/G-128]

KUMAR ANIL, Scientist 'F' and Head (Food & Agri.)

Je ,oa jkstxkj ea=ky;

ubZ fnYyh] 23 flrEcj] 2013

dkñvkñ 2303-—vkS|ksfxd fookn vf/kfu;e] 1947 ¼1947

dk 14½ dh /kkjk 17 ds vuqlj.k esa dsUnzh; ljdkj eSllZ bafM;u

vk;y dkiksZjs'ku fyñ] fnYyh ds izca/kra= ds lac) fu;kstdksa vkSj

muds deZdkjksa ds chp vuqca/k esa fufnZ"V vkS|ksfxd fookn esa dsUnzh;

ljdkj vkS|ksfxd vf/kdj.k ,oa Je U;k;ky; uañ 1] fnYyh ds

iapkV ¼lanHkZ la[;k 50] 55] 56@2013½ izdkf'kr djrh gS tks dsUnzh;

ljdkj dks 20@9@2013 dks izkIr gqvk FkkA

[lañ ,y&30011@90@2002&vkbZ vkj ¼,e½]

tksgu rksiuks] voj lfpo

MINISTRY OF LABOUR AND EMPLOYMENT

New Delhi, the 23rd September, 2013

S.O. 2303.—In pursuance of Section 17 of the

Industrial Disputes Act, 1947 (14 of 1947), the Central

Government hereby publishes the award (Ref. No. 50, 55,

56/2013) of the Central Government Industrial Tribunal/

Labour Court No. 1, Delhi now as shown in the Annexure

in the Industrial Dispute between the employers in relation

to the Management of M/s. Indian Oil Corporation Ltd.

Delhi and their workman, which was received by the Central

Government on 20/9/2013.

[No. L-30011/90/2002-IR(M)]

JOHN TOPNO, Under Secy.

ANNEXURE

BEFORE DR. R.K. YADAV, PRESIDING OFFICER,

CENTRAL GOVERNMENT INDUSTRIAL TRIBUNAL

NO. 1, KARKARDOOMA COURTS COMPLEX,

DELHI

I.D. No. 55/2013

Shri Hari Narayan,

S/o Late Shri Brijpal Verma,

Through New Delhi General Mazdoor Union,

R/o B-89, Gulmohar Park,

New Delhi-110 049

.....Workman

Versus

The Chairman and Managing Director,

Indian Oil Corporation Ltd.

Scope Complex, Core 2,

Lodhi Road,

New Delhi

....Management

AWARD

Indian Oil Corporation Ltd. (hereinafter referred to

as the Corporation) operates seven refineries located at

Digboi, Guwahati, Barauni, Gujarat, Haldia, Mathura and

Panipat. Corporation carries out distribution of various

essential petroleum products to general public, industries,

railways and defence services through a vast marketing

network and pipelines situated at various locations in the

6118

THE GAZETTE OF INDIA : OCTOBER 26, 2013/KARTIKA 4, 1935

[PART II—SEC. 3(ii)]

country. To ensure production and supply of petroleum

products, the Corporation employs various personnel.

Recruitment is made by the Corporation according to

recruitment rules applicable to it.

2. Corporation awarded some work to a contractor,

who employed certain persons to carry out the job so

awarded to him. Persons employed by the contractor

preferred a writ petition before High Court of Delhi bearing

CWP No. 7377 of 99, seeking their regularization in services

of the Corporation. The said writ petition was dismissed

vide order dated 13.09.2011. Later patent appeal was also

dismissed vide order dated 19.10.2001. Thereafter, 18

persons approached the Conciliation Officer, seeking

regularization of their job with the Corporation. When

conciliation proceedings ended into a failure, the appropriate

Government referred the dispute to this Tribunal for

adjudication vide order No. L-3011/90/2002-IR(M),

New Delhi dated 17.03.2003 with the following terms:

"Whether the action of the management of Refinery

Division, HQ, IOCL, New Delhi is not regularizing

the services of 18 workmen (as per the list attached)

from the date of initial appointment is just, fair and

legal? If not, what relief the 18 workmen are entitled

to and from which date?"

3. Claim statement was filed on behalf of the claimant

wherein it was asserted that they were engaged by the

Corporation on different dates since Marcy 1980 till October,

1989. They rendered continuous service to the Corporation.

They claim for reinstatement in the service of the

Corporation since the date of their initial appointment(s).

Their claim was resisted in the written statement, wherein

the Corporation pleads that there was no relationship of

employer and employee between the parties and as such,

claimants are not entitled to any relief of regularization of

their service.

4. During the course of adjudication of the said

dispute, present complaint has been filed under section

33A of the Industrial Disputes Act, 1947 (in short the Act)

alleging therein that services of the claimant were dispensed

with by the Corporation with effect from 31.01.2006.

Complaint sought indulgence of this Tribunal for his

reinstatement in the service since the date of his

termination, effected by the management. In the written

statement, Corporation takes the very plea taken in the

industrial dispute and agitates that claimant was not their

employee. It has been asserted that there was no action on

the part of the Corporation to terminate services of the

claimant. The Corporation presents that the complaint,

under reference, may be dismissed, being devoid of merits.

5. On pleadings of the parties following issues were

settled:

(1)

Whether claimant is a workman concerned in

the dispute referred for adjudication on

17.03.2003 to this Tribunal?

(2)

Whether management violated provisions of

section 33 of the Industrial Disputes Act, 1947?

(3)

Whether claimant is entitled to relief of

reinstatement in service?

6. No evidence was adduced on behalf of the

claimant, despite grant of more than reasonable

opportunities. When claimant failed to adduce evidence,

the Corporation opted not to adduce any evidence in the

matter.

7. Arguments were heard at the bar. Shri B.K. Prasad,

authorized representative, raised submission on behalf of

the claimant. Shri Vinay Sabharwal, authorized

representative, presented facts on behalf of the Corporation.

I have given my careful considerations to the arguments

advanced at the bar and cautiously perused the record.

My findings on issues involved in the controversy, are as

follows:—

Issue No. 1

8. For the purpose of section 33 of the Act, the

workman should not only be a workman within the meaning

of section 2(s) of the Act but should also be ‘concerned in

the dispute pending before the Tribunal.’ Workman

‘concerned in the industrial dispute’ obviously constitute

group which might be less comprehensive in its scope

than all the workmen employed in that industry or even in

one establishment of that industry. The word ‘concerned,

means ‘interested, engaged, having a connection with’ or

interested/involved'. In order to substantiate the claim of

contravention of section 33, the workman has to show that

he was 'concerned' with the pending dispute in any of the

manners envisaged by the expression. It is necessary for

the workman who wants to come within the category of

workman concerned in such dispute to prove that he is

interested in or has connection with the dispute already

pending for determination.

9. In the dispute registered as ID No. 32/2003,

appropriate Government forwarded an issue relating to

regularization of services of 18 workmen with Indian Oil

Corporation Ltd. List of those 18 workmen was annexed

with schedule of reference. Name of the claimant appears

at Sl. No. 12 of the said list. Thus, it is evident that the

claimant was one of the workmen, who had raised the

dispute, which was pending adjudication when his services

were allegedly dispensed with. Taking cognizance of these

facts, it is concluded that the claimant was concerned in

the dispute pending adjudication before this Tribunal. The

issue is, therefore, answered in favour of the claimant and

against the Corporation.

Issue No. 2

10. Section 33 of the Act bars alteration in conditions

of service "prejudicial" to the workman concerned in the

dispute and punishment of discharge or dismissal when

¹Hkkx II—[k.M 3(ii)º

Hkkjr dk jkti=k % vDrwcj 26] 2013@dk£rd 4] 1935

6119

either is connected with pendent lite industrial dispute "save

with the permission of the authorities before which the

proceedings is pending" or where the discharge or

dismissal is for any misconduct not connected with the

pendent lite industrial dispute without the "approval of

such authority". Prohibition contained in Section 33 of the

Act is two fold. On one hand, they are designed to protect

the workman concerned during the course of industrial

conciliation, arbitration and adjudication, against

employers' harassment and victimization, on account of

their having raised the industrial dispute or their continuing

the pending proceedings and on the other, they seek to

maintain status quo by prescribing management conduct

which may give rise to "fresh dispute" which further

exacerbate the already strained relations between employer

and the workman. Where industrial disputes are pendent

lite before an authority mentioned in the section, it was

thought necessary that such disputes should be conciliated

or adjudicated upon by the authority in a peaceful

atmosphere, undisturbed by any subsequent causes for

bitterness or unpleasantness. To achieve this object, a ban

has been imposed upon the employer exercising his

common law, statutory or contractual right to terminate the

services of his employees according to contract or the

provision of law governing such service. The ordinary right

of the employer to alter the terms of his employees' services

to their prejudice or to terminate their services under the

general law governing contract of employment, has been

banned subject to certain conditions. This ban, therefore,

is designed to restrict the interference of the general rights

and liabilities of the parties under the ordinary law within

the limits truly necessary for accomplishing the object of

those provisions. Anxiety to know about ban on the right

of the employer, persuades me to reproduce the provisions

of Section 33 of the Act thus:

"33. Conditions of service, etc., to remain unchanged

under certain circumstances during pendency of

proceedings.—(1) During the pendency of any

conciliation proceeding before a conciliation officer

or a Board or of any proceeding before an arbitrator

or a Labour Court or Tribunal or National Tribunal in

respect of an industrial dispute, no employer shall,—

(a)

in regard to any matter connected with the

dispute, alter, to the prejudice of the workmen

concerned in such dispute, the conditions of

service applicable to them immediately before

the commencement of such proceeding; or

(b)

for any misconduct connected with the

dispute, discharge or punish, whether by

dismissal or otherwise, any workman

concerned in such dispute, save with the

express permission in writing of the authority

before which the proceeding is pending.

(2) During the pendancy of any such proceeding in

respect of an industrial dispute, the employer may, in

accordance with standing orders applicable to a workman

concerned in such dispute or, where there are no such

standing orders, in accordance with the terms of the

contract, whether express or implied, between him and the

workman—

(a)

alter, in regard to any matter not connected

with the dispute, the conditions of service

applicable to that workman immediately before

the commencement of such proceeding; or

(b)

for any misconduct not connected with the

dispute, discharge or punish, whether by

dismissal or otherwise, that workman:—

Provided that no such workman shall be discharged

or dismissed, unless he has been paid wages for one month

and an applicable has been made by the employer to the

authority before which the proceeding is pending for

approval of the action taken by the employer.

(3) Notwithstanding anything contained in sub-

section (2), no employer shall, during the pendency of any

such proceeding in respect of an industrial dispute, take

any action against any protected workman concerned in

such dispute—

(a)

by altering to the prejudice of such protected

workman, the conditions of service applicable

to him immediately before the commencement

of such proceeding; or

(b)

by discharging or punishing, whether any

dismissal or otherwise, such protected

workman,

Save with the express permission in writing of the

authority before which the proceeding is pending.

Explanation.— For the purposes of this sub-section,

a "protected workman", in relation to an establishment,

means a workman who, being a member of the executive or

other office bearer of a registered trade union connected

with the establishment, is recognized as such in accordance

with rules made in this behalf.

(4) In every establishment, the number of workmen

to be recognized as protected workmen for the purposes of

sub-section (3) shall be one per cent of the total number of

workmen employed therein subject to a minimum number

of five protected workmen and a maximum number of one

hundred protected workmen and for the aforesaid purpose,

the appropriate Government may make rules providing for

the distribution of such protected workmen among various

trade unions, if any, connected with the establishment and

the manner in which the workmen may be chosen and

recognized as protected workmen.

6120

THE GAZETTE OF INDIA : OCTOBER 26, 2013/KARTIKA 4, 1935

[PART II—SEC. 3(ii)]

(5) Where an employer makes an application to a

conciliation officer, Board, an arbitrator, a Labour Court,

Tribunal or National Tribunal under the proviso to sub-

section (2) for approval of the action taken by him, the

authority concerned shall, without delay, hear such

application and pass, within a period of three months from

the date of receipt of such application, such order in relation

thereto as it deems fit.

Provided that where any such authority considers it

necessary or expedient so to do, it may, for reasons to be

recorded in writing, extend such period by such further

period as it may think fit.

Provided further that no proceedings before any

such authority shall lapse merely on the ground that any

period specified in this sub-section had expired without

such proceedings being completed.

11. As noted above sub-sections (1) and (2) are

designed for different purposes since sub-section (1)

applies to the proposition when the employer wants to

alter service conditions of the workman to his prejudice in

regard to any matter connected with the dispute or for any

misconduct connected with the dispute, in that situation

he is obliged to seek prior permission in writing of the

authority before whom the dispute is pending and in a

case where the employer wants to alter service conditions

of a workman in regard to a matter not connected with the

dispute or for any misconduct not connected with the

dispute, in that situation he is obliged to seek approval of

the order under sub-section (2) of the aforesaid section.

When an employer violates the provisions of sub-section

(1) or sub-section (2) of section 33 of the Act, an instant

remedy is provided to the workman by the provisions of

section 33A of the Act. In other words, where an employer

has contravened the provisions of section 33, the aggrieved

workman has been given the option to make a complaint in

writing, to the authority before which an industrial dispute

is pending, with which the aggrieved workman is

concerned. The complaint of such contravention can be

made not to the adjudicating authorities, but to the

conciliatory authority also. If a complaint is made to a

conciliatory authority, viz. a Conciliation Officer or a Board

of Conciliation, clause (a) of section 33 A of the act

authorizes a Conciliation Officer or the Board to take such

complaint into account in bringing about a settlement of

the complained dispute. The Conciliation Officer or the

Board is not empowered to adjudicate upon the dispute,

which is the area of adjudicatory authorities. When a

complaint is made to adjudicatory authority viz. Arbitrator,

Labour Court, Tribunal or National Tribunal, it will

adjudicate upon the dispute as if it is a dispute referred to

or pending before it.

12. To attract the provisions of section 33A of the

Act, following conditions precedent are to be satisfied.

1.

that there should have been a contravention

by the management of the provisions of section

33 of the Act,

2.

that the contravention should have been

during the pendancy of the proceedings before

the conciliatory authorities or Labour Court,

Tribunal or National Tribunal, as the case may

be.

3.

that the complainant should have been

aggrieved by the contravention, and

4.

that the application should have been made to

the Labour Court, Tribunal or the National

Tribunal in which original proceedings are

pending.

13. It is obligatory on the claimant to establish on

record that the Corporation has contravened provisions of

section 33 of the Act, during pendancy of adjudication

proceedings in respect of the dispute registered as ID No.

32/2003. In order to discharge that onus, claimant was duty

bound to adduce evidence to establish that his services

were dispensed with by the Corporation. Instead of

adducing any evidence, the claimant opted not to enter the

withness box. Therefore, there remains complete vacuum

of evidence to the effect as to whether services of the

claimant were dispensed with during pendancy of the

aforesaid industrial dispute before the Tribunal. Not even

an iota of evidence is over the record to conclude that the

Corporation has violated provisions of section 33 of the

Act . Onus was on the claimant to establish contravention

of the provisions of section 33 of the Act, which has not

been discharged by him. In absence of material evidence,

findings cannot be recorded to hte effect that the

Corporation dispensed with the services of the claimant

and contravened provisions of section 33 of the Act. For

desideratum of evidence, it is concluded that the claimant

has miserably failed to establish that the Corporation has

contravened provisions of section 33 of the Act, during

pendency of adjudication proceedings of the dispute

referred above. Resultantly, the issue is answered against

the claimant and in favour of the Corporation.

Issue No. 3

14. In view of the findings on issue No. 2, it is

apparent that the claimant is not entitled to any relief.

Complaint, raised by the claimant under section 33A of the

Act, cannot be answered in his favour. He is not entitled to

any relief. Resultantly, his complaint is dismissed. An award

is, accordingly, passed. It be sent to the appropriate

Government for publication.

Dr. R.K YADAV, Presiding Officer

Dated: September 13, 2013

¹Hkkx II—[k.M 3(ii)º

Hkkjr dk jkti=k % vDrwcj 26] 2013@dk£rd 4] 1935

6121

ANNEXURE

BEFORE DR. R.K. YADAV, PRESIDING OFFICER,

CENTRAL GOVERNMENT INDUSTRIAL TRIBUNAL

NO. 1. KARKARDOOMA COURTS COMPLEX,

DELHI

I.D. No. 56/2013

Shri Devendra Singh Negi,

S/o late Shri Nandan Singh,

Through New Delhi General Mazdoor Union,

R/o B-89, Gulmohar Park,.

New Delhi-110 049

....Workman

Versus

The Chairman and Managing Director,

Indian Oil Corporation Ltd.

Scope Complex, Core 2,

Lodhi Road,

New Delhi

.....Management

AWARD

Indian Oil Corporation Ltd. (hereinafter referred to

as the Corporation) operates seven refineries located at

Digboi, Guwahati, Barauni, Gujarat, Haldia, Mathura and

Panipat. Corporation carries out distribution of various

essential petroleum products to general public, industries,

railways and defence services through a vast marketing

network and pipelines situated at various locations in the

country. To ensure production and supply of petroleum

products, the Corporation employs various personnel.

Recruitment is made by the Corporation according to

recruitment rules applicable to it.

2. Corporation awarded some work to a contractor,

who employed certain persons to carry out the job so

awarded to him. Persons employed by the contractor

preferred a writ petition before High Court of Delhi bearing

CWP NO. 7377 of 99, seeking their regularization in services

of the Corporation. The said writ petition was dismissed

vide order dated 19.10.2001. Thereafter, 18 persons

approached the Conciliation Officer, seeking regularization

of their job with the Corporation. When conciliation

proceedings ended into a failure, the appropriate

Government referred the dispute to this Tribunal for

adjudication vide order No.L-30011/90/2002-IR(M), New

Delhi dated 17.03.2003 with the following terms:

"Whether the action of the management of Refinery

Division, HQ, IOCL, New Delhi in not regularizing

the services of 18 workmen (as per the list attached)

from the date of initial appointment is just, fair and

legal? If not, what relief the 18 workmen are entitled

to and from which date?"

3. Claim statement was filed on behalf of the claimant

wherein it was asserted that they were engaged by the

Corporation on different dates since Marcy 1980 till October,

1989. They rendered continuous service to the Corporation.

They claim for reinstatement in the service of the Corporation

since the date of their initial appointment(s). Their claim

was resisted in the written statement, wherein the

Corporation pleads that there was no relationship of

employer and employee between the parties and as such,

claimants are not entitled to any relief of regularization of

their service.

4. During the course of adjudication of the said

dispute, present complaint has been filed under section

33A of the industrial Disputes Act, 1947 (in short the Act)

alleging therein that services of the claimant were dispensed

with by the Corporation with effect from 31.01.2006.

Complaint sought indulgence of this Tribunal for his

reinstatement in the service since the date of his

termination, effected by the management. In the written

statement, Corporation takes the very plea taken in the

industrial dispute and agitates that claimant was not their

employee. It has been asserted that there was no action on

the part of the Corporation to terminate services of the

claimant. The Corporation presents that the complaint,

under reference, may be dismissed, being devoid of merits.

5. On pleadings of the parties following issues were

settled:

(1)

Whether claimant is a workman concerned in

the dispute referred for adjudication on

17.03.2003 to this Tribunal?

(2)

Whether management violated provisions of

section 33 of the Industrial Disputes Act, 1947?

(3)

Whether claimant is entitled to relief of

reinstatement in service?

6. No evidence was adduced on behalf of the

claimant, despite grant of more than reasonable

opportunities. When claimant failed to adduce evidence,

the Corporation opted not to adduce any evidence in the

matter.

7. Arguments were heard at the bar. Shri B.K. Prasad,

authorized representative, raised submission on behalf of

the claimant. Shri Vinay Sabharwal, authorized

representative, presented facts on behalf of the Corporation.

I have given my careful considerations to the arguments

advanced at the bar and cautiously perused the record.

My findings on issues involved in the controversy, are as

follows:—

Issue No. 1

8. For the purpose of section 33 of the Act, the

workman should not only be a workman within the meaning

of section 2(s) of the Act but should also be 'concerned in

the dispute pending before the Tribunal'. Workmen

'concerned in the industrial dispute' obviously constitute

group which might be less comprehensive in its scope

6122

THE GAZETTE OF INDIA : OCTOBER 26, 2013/KARTIKA 4, 1935

[PART II—SEC. 3(ii)]

than all the workmen employed in that industry or even in

one establishment of that industry. The word 'concerned,

means interested, engaged, having a connection with' or

interested/involved'. In order to substantiate the claim of

contravention of section 33, the workman has to show that

he was 'concerned' with the pending dispute in any of the

manners envisaged by the expression. It is necessary for

the workman who wants to come within the category of

workman concerned in such dispute to prove that he is

interested in or has connection with the dispute already

pending for determination.

9. In the dispute registered as ID No.32/2003,

appropriate Government forwarded an issue relating to

regularization of services of 18 workmen with Indian Oil

Corporation Ltd. List of those 18 workmen was annexed

with schedule of reference. Name of the claimant appears

at SI.No.3 of the said list. Thus, it is evident that the claimant

was one of the workmen, who had raised the dispute, which

was pending adjudication when his services were allegedly

dispensed with. Taking cognizance of these facts, it is

concluded that the claimant was concerned in the dispute

pending adjudication before this Tribunal. The issue is,

therefore, answered in favour of the claimant and against

the Corporation.

Issue No. 2

10. Section 33 of the Act bars alteration in conditions

of service "prejudicial" to the workman concerned in the

dispute and punishment of discharge or dismissal when

either is connected with pendente lite industrial dispute

"save with the permission of the authorities before which

the proceedings is pending" or where the discharge or

dismissal is for any misconduct not connected with the

pendente lite industrial dispute without the "approval of

such authority". Prohibition contained in section 33 of the

Act is two fold. On one hand, they are designed to protect

the workman concerned during the course of industrial

conciliation, arbitration and adjudication, against

employers' harassment and victimization, on account of

their having raised the industrial dispute or their continuing

the pending proceedings and on the other, they seek to

maintain status quo by prescribing management conduct

which may give rise to "fresh dispute" which further

exacerbate the already strained relations between employer

and the workman. Where industrial disputes are pendente

lite before an authority mentioned in the section, it was

thought necessary that such disputes should be conciliated

or adjudicated upon by the authority in a peaceful

atmosphere, undisturbed by any subsequent causes for

bitterness or unpleasantness. To achieve this object, a ban

has been imposed upon the employer exercising his

common law, statutory or contractual right to terminate the

services of his employees according to contract or the

provisions of law governing such service. The ordinary

right of the employer to alter the terms of his employees'

services to their prejudice or to terminate their services

under the general law governing contract of employment,

has been banned subject to certain conditions. This bar,

therefore, is designed to restrict the interference of the

general rights and liabilities of the parties under the ordinary

law within the limits truly necessary for accomplishing the

object of those provisions Anxiety to know about ban on

the right of the employer, persuades me to reproduce the

provisions of section 33 of the Act thus:

"33. Conditions of service, etc., to remain unchanged

under certain circumstances during pendancy of

proceedings. —(1) During the pendancy of any

conciliation proceeding before a conciliation officer

or a Board or of any proceeding before an arbitrator

or a Labour Court or Tribunal or National Tribunal in

respect of an industrial dispute, no employer shall,—

(a)

in regard to any matter connected with the

dispute, alter, to the prejudice of the workmen

concerned in such dispute, the conditions of

service applicable to them immediately before

the commencement of such proceeding; or

(b)

for any misconduct connected with the

dispute, discharge or punish, whether by

dismissal or otherwise, any workman

concerned in such dispute, save with the

express permission in writing of the authority

before which the proceeding is pending.

(2) During the pendancy of any such proceeding in

respect of an industrial dispute, the employer may, in

accordance with standing orders applicable to a workman

concerned in such dispute or, where there are no such

standing orders, in accordance with the terms of the

contract, whether express or implied, between him and the

workman—

(a)

alter, in regard to any matter not connected

with the dispute, the conditions of service

applicable to that workman immediately before

the commencement of such proceeding ; or

(b)

for any misconduct not connected with the

dispute, discharge or punish, whether by

dismissal or otherwise, that workman:

Provided that no such workman shall be discharged

or dismissed, unless he has been paid wages for one month

and an application has been made by the employer to the

authority before which the proceeding is pending for

approval of the action taken by the employer.

(3) Notwithstanding anything contained in sub-

section (2), no employer shall, during the pendancy of any

such proceeding in respect of an industrial dispute, take

any action against any protected workman concerned in

such dispute —

(a)

by altering, to the prejudice of such protected

workman, the conditions of service applicable

¹Hkkx II—[k.M 3(ii)º

Hkkjr dk jkti=k % vDrwcj 26] 2013@dk£rd 4] 1935

6123

to him immediately before the commencement

of such proceeding; or

(b)

by discharging or punishing, whether any

dismissal or otherwise, such protected

workman,

save with the express permission in writing of the authority

before which the proceeding is pending.

Explanation. — For the purposes of this sub-

section, a "protected workman", in relation to an

establishment, means a workman who, being a member of

the executive or other office bearer of a registered trade

union connected with the establishment, is recognized as

such in accordance with rules made in this behalf.

(4) In every establishment, the number of workmen

to be recognized as protected workmen for the purposes of

sub-section (3) shall be one per cent of the total number of

workmen employed therein subject to a minimum number

of five protected workmen and a maximum number of one

hundred protected workmen and for the aforesaid purpose,

the appropriate Government may make rules providing for

the distribution of such protected workmen among various

trade unions, if any, connected with the establishment and

the manner in which the workmen may be chosen and

recognized as protected workmen.

(5) Where an employer makes an application to a

conciliation officer, Board, an arbitrator, a Labour Court,

Tribunal or National Tribunal under the proviso to sub-

section (2) for approval of the action taken by him, the

authority concerned shall, without delay, hear such

application and pass, within a period of three months from

the date of receipt of such application, such order in relation

thereto as it deems fit.

Provided that where any such authority considers it

necessary or expedient so to do, it may, for reasons to be

recorded in writing, extend such period by such further

period as it may think fit.

Provided further that no proceedings before any

such authority shall lapse merely on the ground that any

period specified in this sub-section had expired without

such proceedings being completed.

11. As noted above sub-sections (1) and (2) are

designed for different purposes since sub-section (1)

applies to the proposition when the employer wants to

alter service conditions of the workman to his prejudice in

regard to any matter connected with the dispute or for any

misconduct connected with the dispute, in that situation

he is obliged to seek prior permission in writing of the

authority before whom the dispute is pending and in a

case where the employer wants to alter service conditions

of a workman in regard to a matter not connected with the

dispute or for any misconduct not connected with the

dispute, in that situation he is obliged to seek approval of

the order under sub-section (2) of the aforesaid section.

When an employer violates the provisions of sub-section

(1) or sub-section (2) of section 33 of the Act, an instant

remedy is provided to the workman by the provisions of

section 33A of the Act. In other words, where an employer

has contravened the provisions of section 33, the aggrieved

workman has been giver the option to make a complaint in

writing, to the authority before which an industrial dispute

is pending, with which the aggrieved workman is

concerned. The complaint of such contravention can be

made not to the adjudicating authorities, but to the

conciliatory authority also. If a complaint is made to a

conciliatory authority, viz. a Conciliation Officer or a Board

of Conciliation, clause (a) of section 33 A of the act

authorizes a Conciliation Officer or the Board to take such

complaint into account in bringing about a settlement of

the complained dispute. The Conciliation Officer or the

Board is not empowered to adjudicate upon the dispute,

which is the area of adjudicatory authorities. When a

complaint is made to adjudicatory authority viz. Arbitrator,

Labour Court, Tribunal or National Tribunal, it will

adjudicate upon the dispute as if it is a dispute referred to

or pending before it.

12. To attract the provisions of section 33A of the

Act, following conditions precedent are to be satisfied.

1. `that there should have been a contravention by

the management of the provisions of section

33 of the Act,

2.

that the contravention should have been

during the pendancy of the proceedings before

the conciliatory authorities or Labour Court,

Tribunal or National Tribunal , as the case

may be.

3.

that the complainant should have been

aggrieved by the contravention, and

4.

that the application should have been made to

the Labour Court, Tribunal or the National

Tribunal in which original proceedings are

pending.

13. It is obligatory on the claimant to establish on

record that the Corporation has contravened provisions of

section 33 of the Act, during pendancy of adjudication

proceedings in respect of the dispute registered as ID

No.32/2003. In order to discharge that onus, claimant was

duty bound to adduce evidence to establish that his

services were dispensed with by the Corporation. Instead

of adducing any evidence, the claimant opted not to enter

the witness box. Therefore, there remains complete vacuum

of evidence to the effect as to whether services of the

6124

THE GAZETTE OF INDIA : OCTOBER 26, 2013/KARTIKA 4, 1935

[PART II—SEC. 3(ii)]

claimant were dispensed with during pendancy of the

aforesaid industrial dispute before the Tribunal. Not even

an iota of evidence is over the record to conclude that the

Corporation has violated provisions of section 33 of the

Act. Onus was on the claimant to establish contravention

of the provisions of section 33 of the Act, which has not

been discharged by him. In the absence of material evidence,

findings cannot be recorded to the effect that the

Corporation dispensed with the services of the claimant

and contravened provisions of srction 33 of the Act. For

desideratum of evidence, it is concluded that the claimant

has miserably failed to establish that the Corporation has

contravened provisions of section 33 of the Act, during

pendancy of adjudication proceedings of the dispute

referred above. Resultantly, the issue is answered against

the claimant and in favour of the Corporation.

Issue No. 3

14. In view of the findings on issue No.2, it is apparent

that the claimant is not entitled to any relief. Complaint,

raised by the claimant under section 33A of the Act, cannot

be answered in his favour. He is not entitled to any relief.

Resultantly, his complaint is dismissed. An award is,

accordingly, passed. It be sent to the appropriate

Government for publication.

Dr. R. K. YADAV, Presiding Officer

Dated: September 13, 2013

ANNEXURE

BEFORE DR. R.K. YADAV, PRESIDING

OFFICER, CENTRAL GOVERNMENT

INDUSTRIAL TRIBUNAL NO. 1,

KARKARDOOMA COURTS COMPLEX,

DELHI

I.D. No. 50/2013

Shri Prakash Singh,

S/o Shri Ranjit Singh,

Through New Delhi General Mazdoor Union,

R/o B-89, Gulmohar Park,

New Delhi 110 049

....Workman

Versus

The Chairman and Managing Director,

Indian Oil Corporation Ltd.,

Scope Complex, Core 2

Lodhi Road,

New Delhi

....Management

AWARD

Indian Oil Corporation Ltd. (hereinafter referred to

as the Corporation) operates seven refineries located at

Digboi, Guwahati, Barauni, Gujarat, Haldia, Mathura and

Panipat. Corporation carries out distribution of various

essential petroleum products to general public, industries,

railways and defence services through a vast marketing

network and pipelines situated at various locations in the

country. To ensure production and supply of petroleum

products, the Corporation employs various personnel.

Recruitment is made by the Corporation according to

recruitment rules applicable to it.

2. Corporation awarded some work to a contractor,

who employed certain persons to carry out the job so

awarded to him. Persons employed by the contractor

preferred a writ petition before High court of Delhi bearing

CWP No.7377 of 99, seeking their regularization in services

of the Corporation. The said writ petition was dismissed

vide order dated 13.09.2001. Later patent appeal was also

dismissed vide order dated 19.10.2001. Thereafter, 18

persons approached the Conciliation Officer, seeking

regularization of their job with the Corporation. When

conciliation proceedings ended into a failure, the appropriate

Government referred the dispute to this Tribunal for

adjudication vide order No.L-30011/90/2002-IR(M),

New Delhi dated 17.03.2003 with the following terms:

"Whether the action of the management of Refinery

Division, HQ, IOCL, New Delhi in not regularizing

the services of 18 workmen (as per the list attached)

from the date of initial appointment is just, fair and

legal? If not, what relief the 18 workmen are entitled

to and from which date?"

3. Claim statement was filed on behalf of the claimant

wherein it was asserted that they were engaged by the

Corporation on different dates since March 1980 till October

1989. They rendered continuous service to the Corporation.

They claim for reinstatement in the service of the

Corporation since the date of their initial appointment(s).

Their claim was resisted in the written statement, wherein

the Corporation pleads that there was no relationship of

employer and employee between the parties and as such,

claimants are not entitled to any relief of regularization of

their service.

4. During the course of adjudication of the said

dispute, present complaint has been filed under section

33A of the Industrial Disputes Act, 1947(in short the Act)

alleging therein that services of the claimant were dispensed

with by the Corporation with effect from 31.01.2006.

¹Hkkx II—[k.M 3(ii)º

Hkkjr dk jkti=k % vDrwcj 26] 2013@dk£rd 4] 1935

6125

Complaint sought indulgence of this Tribunal for his

reinstatement in the service since the date of his

termination, effected by the management. In the written

statement, Corporation takes the very plea taken in the

industrial dispute and agitates that claimant was not their

employee. It has been asserted that there was no action on

the part of the Corporation to terminate services of the

claimant. The Corporation presents that the complaint,

under reference, may be dismissed, being devoid of merits.

5. On pleadings of the parties following issues were

settled:

(1)

Whether claimant is a workman concerned in

the dispute referred for adjudication on

17.03.2003 to this Tribunal?

(2)

Whether management violated provisions of

section 33 of the Industrial Disputes Act, 1947?

(3)

Whether claimant is entitled to relief of

reinstatement in service?

6. No evidence was adduced on behalf of the

claimant, despite grant of more than reasonable

opportunities. When claimant failed to adduce evidence,

the Corporation opted not to adduce any evidence in the

matter.

7. Arguments were heard at the bar. Shri B.K. Prasad,

authorized representative, raised submission on behalf of

the claimant. Shri Vinay Sabharwal, authorized

representative, presented facts on behalf of the Corporation.

I have given my careful considerations to the arguments

advanced at the bar and cautiously perused the record.

My findings on issues involved in the controversy, are as

follows:—

Issue No. 1

8. For the purpose of section 33 of the Act, the

workman should not only be a workman within the meaning

of section 2(s) of the Act but should also be 'concerned in

the dispute pending before the Tribunal'. Workmen

'concerned in the industrial dispute' obviously constitute

group which might be less comprehensive in its scope

than all the workmen employed in that industry or even in

one establishment of that industry. The word 'concerned,

means 'interested, engaged, having a connection with' or

interested/involved'. In order to substantiate the claim of

contravention of section 33, the workman has to show

that he was 'concerned' with the pending dispute in any of

the manners envisaged by the expression. It is necessary

for the workman who wants to come within the category of

workman concerned in such dispute to prove that he is

interested in or has connection with the dispute already

pending for determination.

9. In the dispute registered as ID No.32/2003,

appropriate Government forwarded an issue relating to

regularization of services of 18 workmen with Indian Oil

Corporation Ltd. List of those 18 workmen was annexed

with schedule of reference. Name of the claimant appears

at Sl. No.11 of the said list. Thus, it is evident that the

claimant was one of the workmen, who had raised the

dispute, which was pending adjudication when his services

were allegedly dispensed with. Taking cognizance of these

facts, it is concluded that the claimant was concerned in

the dispute pending adjudication before this Tribunal. The

issue is, therefore, answered in favour of the claimant and

against the Corporation.

Issue No. 2

10. Section 33 of the Act bars alteration in conditions

of service "prejudicial" to the workman concerned in the

dispute and punishment of discharge or dismissal when

either is connected with pendente lite industrial dispute

"save with the permission of the authorities before which

the proceedings is pending" or where the discharge or

dismissal is for any misconduct not connected with the

pendente lite industrial dispute without the "approval of

such authority". Prohibition contained in section 33 of the

Act is two fold. On one hand, they are designed to protect

the workman concerned during the course of industrial

conciliation, arbitration and adjudication, against

employers' harassment and victimization, on account of

their having raised the industrial dispute or their continuing

the pending proceedings and on the other, they seek to

maintain status quo by prescribing management conduct

which may give rise to "fresh dispute" which further

exacerbate the already strained relations between employer

and the workman. Where industrial disputes are pendente

lite before an authority mentioned in the section, it was

thought necessary that such disputes should be conciliated

or adjudicated upon by the authority in a peaceful

atmosphere, undisturbed by any subsequent causes for

bitterness or unpleasantness. To achieve this object, a ban

has been imposed upon the employer exercising his

common law, statutory or contractual right to terminate the

services of his employees according to contract or the

provisions of law governing such service. The ordinary

right of the employer to alter the terms of his employees'

services to their prejudice or to terminate their services

under the general law governing, contract of employment,

has been banned subject to certain conditions. This ban,

therefore, is designed to restrict the interference of the

general rights and liabilities of the parties under the ordinary

law within the limits truly necessary for accomplishing the

object of those provisions. Anxiety to know about ban on

6126

THE GAZETTE OF INDIA : OCTOBER 26, 2013/KARTIKA 4, 1935

[PART II—SEC. 3(ii)]

the right of the employer, persuades me to reproduce the

provisions of section 33 of the Act thus:

"33. Conditions of service, etc., to remain unchanged

under certain circumstances during pendancy of

proceedings. —(1) During the pendancy of any

conciliation proceeding before a conciliation officer

or a Board or of any proceeding before an arbitrator

or a Labour Court or Tribunal or National Tribunal in

respect of an industrial dispute, no employer shall ,-

(a)

in regard to any matter connected with the

dispute, alter, to the prejudice of the workmen

concerned in such dispute, the conditions of

service applicable to them immediately before

the commencement of such proceeding; or

(b)

for any misconduct connected with the

dispute, discharge or punish, whether by

dismissal or otherwise, any workman

concerned in such dispute, save with the

express permission in writing of the authority

before which the proceeding is pending.

(2) During the pendancy of any such proceeding in

respect of an industrial dispute, the employer may, in

accordance with standing orders applicable to a workman

concerned in such dispute or, where there are no such

standing orders, in accordance with the terms of the

contract, whether express or implied, between him and the

workman—

(a)

alter, in regard to any matter not connected

with the dispute, the conditions of service

applicable to that workman immediately before

the commencement of such proceeding ; or

(b)

for any misconduct not connected with the

dispute, discharge or punish, whether by

dismissal or otherwise, that workman:

Provided that no such workman shall be discharged

or dismissed, unless he has been paid wages for one month

and an application has been made by the employer to the

authority before which the proceeding is pending for

approval of the action taken by the employer.

(3) Notwithstanding anything contained in sub-

section (2), no employer shall, during the pendancy of any

such proceeding in respect of an industrial dispute, take

any action against any protected workman concerned in

such dispute —

(a)

by altering, to the prejudice of such protected

workman, the conditions of service applicable

to him immediately before the commencement

of such proceeding; or

(b)

by discharging or punishing, whether any

dismissal or otherwise, such protected

workman,

save with the express permission in writing of the

authority before which the proceeding is pending.

Explanation. — For the purposes of this sub-

section, a "protected workman", in relation to an

establishment, means a workman who, being a member of

the executive or other office bearer of a registered trade

union connected with the establishment, is recognized as

such in accordance with rules made in this behalf.

(4) In every establishment, the number of workmen

to be recognized as protected workmen for the purposes of

sub-section (3) shall be one per cent of the total number of

workmen employed therein subject to a minimum number

of five protected workmen and a maximum number of one

hundred protected workmen and for the aforesaid purpose,

the appropriate Government may make rules providing for

the distribution of such protected workmen among various

trade unions, if any, connected with the establishment and

the manner in which the workmen may be chosen and

recognized as protected workmen.

(5) Where an employer makes an application to a

conciliation officer, Board, an arbitrator, a Labour Court,

Tribunal or National Tribunal under the proviso to sub-

section; (2) for approval of the action taken by him, the

authority concerned shall, without delay, hear such

application and pass, within a period of three months from

the date of receipt of such application, such order in relation

thereto as it deems fit:

Provided that where any such authority considers it

necessary or expedient so to do, it may, for reasons to be

recorded in writing, extend such period by such further

period as it may think fit:

Provided further that no proceedings before any

such authority shall lapse merely on the ground that any

period specified in this sub-section had expired without

such proceedings being completed.

11. As noted above sub-sections (1) and (2) are

designed for different purposes since sub-section (1)

applies to the proposition when the employer wants to

alter service conditions of the workman to his prejudice in

regard to any matter connected with the dispute or for any

misconduct connected with the dispute, in that situation

he is obliged to seek prior permission in writing of the

authority before whom the dispute is pending and in a

case where the employer wants to alter service conditions

of a workman in regard to a matter not connected with the

dispute or for any misconduct not connected with the

dispute, in that situation he is obliged to seek approval of

the order under sub-section (2) of the aforesaid section.

When an employer violates the provisions of

sub-section (1) or sub-section (2) of section 33 of the Act,

an instant remedy is provided to the workman by the

provisions of section 33A of the Act. In other words,

¹Hkkx II—[k.M 3(ii)º

Hkkjr dk jkti=k % vDrwcj 26] 2013@dk£rd 4] 1935

6127

where an employer has contravened the provisions of

section 33, the aggrieved workman has been given the

option to make a complaint in writing, to the authority

before which an industrial dispute is pending, with which

the aggrieved workman is concerned. The complaint of

such contravention can be made not to the adjudicating

authorities, but to the conciliatory authority also. If a

complaint is made to a conciliatory authority, viz. a

Conciliation Officer or a Board of Conciliation, clause (a) of

section 33 A of the act authorizes a Conciliation Officer or

the Board to take such complaint into account in bringing

about a settlement of the complained dispute. The

Conciliation Officer or the Board is not empowered to

adjudicate upon the dispute, which is the area of

adjudicatory authorities. When a complaint is made to

adjudicatory authority viz. Arbitrator, Labour Court,

Tribunal or National Tribunal, it will adjudicate upon the

dispute as if it is a dispute referred to or pending before it.

12.To attract the provisions of section 33A of the

Act, following conditions precedent are to be satisfied:

1.

that there should have been a contravention

by the management of the provisions of section

33 of the Act,

2.

that the contravention should have been

during the pendancy of the proceedings before

the conciliatory authorities or Labour Court,

Tribunal or National Tribunal , as the case may

be,

3.

that the complainant should have been

aggrieved by the contravention, and

4.

that the application should have been made to

the Labour Court, Tribunal or the National

Tribunal in which original proceedings are

pending.

13.It is obligatory on the claimant to establish on

record that the Corporation has contravened provisions of

section 33 of the Act, during pendancy of adjudication

proceedings in respect of the dispute registered as ID

No.32/2003. In order to discharge that onus, claimant was

duty bound to adduce evidence to establish that his

services were dispensed with by the Corporation. Instead

of adducing any evidence, the claimant opted not to enter

the witness box. Therefore, there remains complete vacuum

of evidence to the effect as to whether services of the

claimant were dispensed with during pendancy of the

aforesaid industrial dispute before the Tribunal. Not even

an iota of evidence is over the record to conclude that the

Corporation has violated provisions of section 33 of the

Act. Onus was on the claimant to establish contravention

of the provisions of section 33 of the Act, which has not

been discharged by him. In the absence of material evidence,

findings cannot be recorded to the effect that the

Corporation dispensed with the services of the claimant

and contravened provisions of section 33 of the Act. For

desideratum of evidence, it is concluded at the claimant

has miserably failed to establish that the Corporation has

contravened provisions of section 33 of the Act, during

pendancy of adjudication proceedings of the dispute

referred above. Resultantly, the issue is answered against

the claimant and in favour of the Corporation.

Issue No.3

14.In view of the findings on Issue No 2, it is apparent

that the claimant is not entitled to any relief. Complaint,

raised by the claimant under section 33A of the Act, cannot

be answered in his favour. He is not entitled to any relief.

Resultantly, his complaint is dismissed. An award is,

accordingly, passed. It be sent to the appropriate

Government for publication.

Dated: 13.9.2013

Dr. R.K. YADAV, Presiding Officer.

ubZ fnYyh] 24 flrEcj] 2013

dkñvkñ 2304-—vkS|ksfxd fookn vf/kfu;e] 1947 ¼1947

dk 14½ dh /kkjk 17 ds vuqlj.k esa] dsUnzh; ljdkj eSllZ funs'kd

,;jiksVZ] ukxiqj ds izca/kra= ds lac) fu;kstdksa vkSj muds deZdkjksa

ds chp] vuqca/k esa fufnZ"V vkS|ksfxd fookn esa dsUnzh; ljdkj

vkS|ksfxd vf/kdj.k ,oa Je U;k;y;] ukxiqj ds iapkV ¼lanHkZ la[;k

49@2007½ dks izdkf'kr djrh gS] tks dsUnzh; ljdkj dks

23-09-2013 dks izkIr gqvk FkkA

[lañ ,y&11012@12@2007&vkbZ vkj¼,e½]

tksgu rksiuks] voj lfpo

New Delhi, the 24th September, 2013

S.O. 2304.—In pursuance of Section 17 of the

Industrial Disputes Act, 1947 (14 of 1947), the Central

Government hereby publishes the Award (Ref. No. 49/2007)

of the Central Government Industrial Tribunal/Labour

Court, Nagpur now as in the Annexure in the Industrial

Dispute between the employers in relation to the

management of Air Port Director, Nagpur and their workman,

which was received by the Central Government on

23.09.2013.

[No. L-11012/12/2007-IR(M)]

JOHAN TOPNO, Under Secy.

ANNEXURE

BEFORE SHRI J. P. CHAND, PRESIDING OFFICER,

CGIT-CUM-LABOUR COURT, NAGPUR

Case No. CGIT-NGP/49/2007

Party No. 1

:

The Airport Director, (NAD),

Nagpur Airport, Regional Office,

Nagpur

6128

THE GAZETTE OF INDIA : OCTOBER 26, 2013/KARTIKA 4, 1935

[PART II—SEC. 3(ii)]

Party No. 2

:

Shri Ramesh Shankarrao Nandgave,

C/o. R.N. Sindel, Plot No. 99,

Nardelwar Nagar, in Front of D.S.

Vidhyalaya, Wardha Road,

Chinch Bhavan Post: Khapri, Nagpur.

AWARD

(Dated: 19th August, 2013)

In excercise of the powers conferred by clause (d) of

sub-section (1) and sub-section 2(A) of section 10 of

Industrial Disputes Act, 1947 (14 of 1947) ("the Act" in

short), the Central Government has referred the industrial

dispute between the employers, in relation to the

management of Airport Authority of India and their

workman, Shri Ramesh Nandgave, for adjudication, as per

letter No.L-11012/12/2007-IR(M) dated 27.08.2007, with the

following schedule:-

"Whether the action of the management of Airport

Authority of India through its Airport Director,

Nagpur in terminating the service of workman

Shri Ramesh Shankarrao Nandgave w.e.f.. 07.04.1999

is legal and justified? If not, then what is the relief

the workman is entitled to?"

2. On receipt of the reference, the parties were noticed

to file their respective statement of claim and written

statement and accordingly, the workman, Shri Ramesh

Nandgave, ('the workman" in short), filed the statement of

claim and the management of Airport Authority of India,

(''Party No. 1'' in short) filed their written statement.

The case of the workman is that he was in the

employment of Party No. 1 and was working as a permanent

motor driver (higher grade) (MTD) and he has completed

19 years of unblemished service, but Party No. 1 removed

him from service w.e.f. 07.04.1999 illegally, in an absolutely

arbitrary manner and in violation of the principles of natural

justice and his removal from services was without

conducting of any departmental enquiry, but the same was

done in a haste, on false allegation and trumped-up-charge

of absence without leave and on receipt of the

"memorandum" issued by the Party No. 1, on 26.03.1999,

though he was suffering from jaundice, he approached the

Party No. 1, in person on 26.03.1999 itself, alongwith joining

report and medical certificate to join duty, which was within

the stipulated period as mentioned in the said memorandum,

but he was instructed by the Airport Director to see the

EMO for submission of the joining report, but at the relevant

time, the EMO was not present in his cabin, for which, he

waited for the return of the EMO and the EMO returned to

the office in the evening hours and asked him to come on

the next day and from 26.03.1999 to 9th April 1999, he

approached the EMO and Airport Director daily to allow

him to join duty, but they refused to accept and acknowledge

the joining report and medical certificate and he made

number of representation to the concerned higher

authorities for redress of his genunie grievances, but of no

avail and as such, the industrial dispute was raised by him.

It is further pleaded by the workman that his services

were terminated during the process of his transfer from

Nagpur to Indore on promotion as "Dirver Super".

The workman has prayed for his reinstatement in

service with continuity and full back wages.

3. In the written statement, it has been pleaded by

Party No.1 inter-alia that the workman was initially

appointed in Civil Aviation Department on 07.09.1981 as a

driver (fire) and subsequently, he was absorbed in National

Airport Authority of India w.e.f. 02.10.1989 and his service

was placed with Airport Authority of India from 01.04.1995

and he was re-mustered to the post of M.T. Driver (higher

grade) from driver (fire) since 04.03.1996 and the workman

absconded from 05.06.1996 to 13.011.1998 (for a total period

of 523 days) and remained absent from duty without any

leave and as such, the services of the workman were

terminated after completion of all necessary legal proceeding

including giving of press notice and it had issued 14

memorandums in between 24.10.1990 to 12.01.1999 and three

memos were issued followed by notice in Newspaper to

the workman, before he was terminated from services, but

he did not come to join his duty within the stipulated time

and as the workman had not approached to join his duty

within the stipulated period, after issuance of the memos

and notices, there was no question of refusing to accept

and acknowledge the joining report and medical certificate

by its authority and the workman was never vigilant and

he did not try to give any explanation regarding his absence

and though the workman had submitted that he was ill

from jaundice, he failed to intimate about his illness or to

submit any leave application to it and as the workman was

absent from duty without prior permission for a period of

380 days during the period from 25.04.1997 to 25.10.1998

and in view of the irregular attendance, careless driving

habit and misconduct of the workman, the Airport Director

had recommended to the Regional Executive Director,

Mumbai for his transfer and the Regional Executive Director,

Mumbai had issued the order of transfer of the workman

from Nagpur to Indore on administrative ground and the

workman was not transferred on promotion of driver

supervisor and the claim of the workman is based on false

and imaginary grounds and the mandatory provisions was

not complied with by the workman and the claim has been

filed beyond limitation and is therefore liable to be

dismissed.

The specific plea of the Party No.1 is that the workman

absented from duty without information or prior sanction

of leave, so he was advised by memorandum no. Con/E2/

99/68-70 dated 10.03.1999 to submit his explanation for

remaining absent without authorized leave and to join duty

within 10 days of the issuance of the memorandum, failing

which, it would be presumed that he is not interested in

¹Hkkx II—[k.M 3(ii)º

Hkkjr dk jkti=k % vDrwcj 26] 2013@dk£rd 4] 1935

6129

continuing his employment and the workman received the

memorandum, but neither he reported for duty nor

responded to the memorandum within the stipulated time,

so on 23.03.1999, again a memorandum was issued to the

workman intimating that he failed to join duty within the

stipulated time and remained absent unauthorisedly, from

which it could be presumed that he is disinterestness in

continuing in service and to submit his explanation as to

why his name should not be removed from the rolls and

he was directed to join duty within 15 days, but however,

the workman failed to join duty within the stipulated period,

so he was intimated that he had abandoned the employment

on his own volition and his name had been removed from

its rolls, which was followed by public notice in two local

news papers in Marathi and Hindi and after termination,

the workman press hard for his final payment of CPF/GSLIS/

gratuity and BF etc. and he had been paid a sum of

Rs. 1,06,050 towards CPF during November, 2000 and a

sum of Rs. 1100 towards BF during October, 2000 and

therefore, the workman is not entitled to any relief.

4. In the rejoinder, it has been pleaded by the

workman that the charge of absconding levelled against

him is frivolous, trumped-up and concocted and his claim

is based on absolute genuine and bona-fide grounds and

the filing of the claim is well within the limitation and

termination of his services was without following the due

procedure of law and principles of natural justice and equity

and so far the payment of CPF is concerned, it was

inevitable and unavoidable in the circumstances arising

out of termination of his service and the charge of his

frequent unauthorized absence is false and he is entitled

for reinstatement in service with continuity and full back

wages.

5. In support of their respective claims, both the

parties have led oral evidence, besides placing reliance on

documentary evidence.

Three witnesses including the workman have been

examined on behalf of the workman, whereas only one

witness, namely Shri R.P. Nandanwar has been examined

on behalf of the Party No. 1.

6. In his examination-in-chief, which is on affidavit,

the workman has reiterated the facts mentioned in the

statement of claim. In his cross-examination, the workman

has admitted that on 04.09.1996, he was appointed as a

higher grade M.T. Driver and on 01.04.1995, he had joined

in the office of the Airport Authority and he received the

memorandum dated 23.03.1999 issued by the Party No.1 on

26.03.1999 and after receipt of his termination letter, he

represented for release of his CPF and other entitlements.

7. The witness no.2, Shri Ramchandra Punjabrao

Bobde for the workman in his evidence has stated that he

was working as the senior superintendent of Fire and at

the relevant time i.e. the period during which, the process

of the termination of the workman was going on, Shri S.S.

Subhu was the EMO, who was the section incharge of the

M.T. Pool and repairing workshop and he had seen the

workman of making personal approaches from 26th March,

1999 to 9th April, 1990 to the EMO for the purpose of joining

duty even though he (workman) was suffering from

Jaundice and the workman was terminated from service

w.e.f. 7th April, 1999 without conducting any departmental

enquiry.

Though this witness has been cross-examined at

length, his evidence that the workman approached the EMO

from 26.03.1999 to 09.04.1999 for the purpose of joining

duty has remained un-assailed.

8. The evidence of witness no.3, Shri Rameshwar V.

Uike for the workman is also in the line of the evidence of

the witness no.2. The evidence of this witness in regard to

the facts that the workman had approached the EMO from

26.03.1999 to 09.04.1999, for the purpose of joining duty

has not been seriously challenged in the cross-examination.

9. The evidence of the witness for the Party No. 1 is

also on affidavit. This witness has also reiterated the facts

mentioned in the written statement, in his examination-in-

chief. This witness has also proved the memorandums

issued to the workman on 17.03.1998 and 01.07.1998 and

other documents as Exts. M-II to M-XVI.

In his cross-examination, the witness for Party No.1

has admitted that there was no departmental proceeding

against the workman and management did not submit any

charge sheet against the workman for remaining

unauthorized absence from 05.06.1996 to 07.04.1999 and

there was also no departmental enquiry against him.

10. At the time of argument, (written notes of

argument) it was submitted by the learned advocate for the

workman that there is sufficient material on record in the

form of cogent oral and conclusive documentary any

evidence to show that the workman was illegally and

unjustifiably terminated from services w.e.f. 07.04.1999 and

the termination of the workman was without submission of

charge sheet or conducting of any departmental enquiry

and the same was in complete violation of the principles of

natural justice and though after receipt of the memorandum

dated 23.03.1999, the workman approached the competent

authority personally from 26.03.1999 to 09.04.1999 to allow

him to join duty, he was not allowed to join duty and such

facts have been fully proved not only from the evidence of

the workman, but also, from the evidence of the two other

witnesses examined by the workman and the evidence

adduced by the management is devoid of merit and

substance and is without any basis and as such, the

workman is entitled for reinstatement in service with

continuity and full back wages.

11. Per contra, it was submitted by the learned

advocate for the Party No.1 that the workman remained

absent from duty without sanction of leave for 523 days in

6130

THE GAZETTE OF INDIA : OCTOBER 26, 2013/KARTIKA 4, 1935

[PART II—SEC. 3(ii)]

between 05.06.1996 to 13.11.1998 and the witness for the

management has stated about such facts in his evidence

and the documents Exts. M-IV and M-VII also prove such

facts and several memorandums were issued to the

workman by registered post with acknowledgement due to

join duty within the stipulated time and the workman

received the same, but inspite of the same, as the workman

did not join duty within the time given in the memorandums,

he was terminated from service and the termination of the

workman is legal and justified and the same was done after

compliance of all the legal formalities and Exts. M-II to

M-XVI amply prove such facts and the workman is not

entitled to any relief.

12. In this case, in paragraph one of the written

statement, the party no.1 has pleaded that, the workman

absconded from 05.06.1996 to 13.11.1998 and remained

absent from duty without leave and after completion of all

necessary legal proceedings including press notice, his

services were terminated. In paragraph five of the written

statement, it has been pleaded by party no. 1 that the

workman was absent from his duty without prior permission

for a period of 380 days during the period from 25.04.1997

to 25.10.1998 and on the recommendation of the Airport

Director, the Regional Executive Director, Mumbai had

issued order of transfer of the workman from Nagpur to

Indore on administrative ground and even after transfer

order, the workman did not approach the management and

after giving three notices successively, the workman was

terminated.

In paragraph 6 of the written statement, it has been

pleaded by party no.1 that the termination is caused due to

the long absence without leave and prior permission and

failing to explain his reason for being absent inspite of

various opportunities given to him, so he is not entitled for

relief claimed. In "special pleadings" also the party no.1

has taken the same stand.

13. On perusal of Ext. M-IV, the memorandum dated

01.07.1998 filed by the party no.1, it is found that the claim

of party no.1 that the workman absconded from 05.06.1996

to 13.11.1998 is not at all correct. Ext. M-IV shows the

periods of absence of the workman from duty and the

applications submitted by him for different leaves. In Ext.

M-IV, the workman was advised and cautioned to attend

duty punctually, regularly and in orderly manner, failing

which disciplinary action deemed fit would be taken against

him. From Ext. M-IV, which is a letter written by the Airport

Director to the Executive Director (WR), Mumbai Airport,

it is found that the workman had applied for medical leave

for the periods from 25.04.1997 to 17.07.1997, 12.08.1997 to

29.09.1997 and 11.07.1998 to 25.10.1998 and E.L. for

31.12.1997 to 19.05.1998. In the said letter, it has also been

mentioned that the workman while joining duty on

20.05.1998, requested for his transfer out of Nagpur and

the Airport Director recommended for his transfer.

Ext. M-VII, which is "compilation report against Shri

R.S. Nandgave, MTD" shows that the workman had

submitted applications for availing different leaves for the

different periods of his absence including the period from

31.12.1997 to 19.05.1998 and 11.07.1998 to 25.10.1998. In

Ext. M-VII, it has also been mentioned that message had

been received about the sickness of the workman for

remaining absence from 07.11.1998 to 13.11.1998, but unfit

certificate was not received. In the same document, it has

been mentioned that, At present from 07.11.1998 till date

(13.11.1998) he has reported for duty but informed through

ATC that he is sick. No unfit certificate received.

After reporting for duty in Nagpur, he was present

only for few days and in that few days he was found

maximum days in intoxicated mood.

It is therefore, requested that the necessary

disciplinary action may be taken against Shri R.S.

Nandgave, MTD and make it an example for other staff in

this section."

From the contents of the documents, it is clear that

the claim of the party no.1 that the workman absconded

from 05.06.1996 to 13.11.1998 is not all correct.

14. Though, the workman has denied the receipt of

the memorandums, Ext. M-II, M-IV and M-X, from the

acknowledgement due, it is found that the workman had

received the said memorandums. However, it is to be

mentioned here that vide memorandum, Ext. M-VIII, which

was issued on 23.03.1999, the workman was directed to

join duty within 15 days of the issue of the memorandum,

failing which it would be presumed that he is not interested

to continue in service. The stipulated 15 days time was to

expire on 07.04.2013, as the said memorandum was issued

on 23.031999. But, Ext. M-XII shows that the name of the

workman was removed from the rolls of party no.1 as per

order dated 05.04.1999, which was prior to the stipulated

time given to the workman for joining duty. Moreover, Ext.

M-XII does not indicate that the name of the workman was

removed from the rolls w.e.f. 07.04.1999. Hence, the order

passed on 05.04.1999 as per Ext. M-XII is illegal.

15. The most important point in this case is the legality

of the action of the party no.1 in terminating the services of

the workman. Admittedly, no charge sheet of any kind for

commission of any misconduct including remaining of

unauthorized absence was submitted against the workman.

It is also admitted that no departmental enquiry was

conducted against the workman for remaining unauthorized

absence. None of the memorandums or other documents

filed by the party no. 1 shows as to under what provisions

of law, Rules, Regulations, Certified Standing Orders if any

or Bipartite settlement if any, the memorandums were issued

and the order of termination was passed. The party no.1

has also not mentioned under what provisions the order of

termination of the workman was passed either in the written

statement or in the evidence adduced in the reference. The

party no.1 has also not produced any Rules or Regulation

¹Hkkx II—[k.M 3(ii)º

Hkkjr dk jkti=k % vDrwcj 26] 2013@dk£rd 4] 1935

6131

or any other relevant documents to show the provision of

terminating the services of the workman by merely serving

memorandums to join duty, without taking action by

initiating departmental proceedings against him.

16. In view of the materials on record and the facts

mentioned above, it is found that the termination of the

workman is illegal and against the principles of natural

justice and the workman is entitled to reinstatement in

service with continuity. The submission of the application

by the workman for release of CPF cannot be taken as a

ground for holding the order of termination as valid.

So far the back wages is concerned, after taking into

consideration the facts and circumstances of the case, I

think that ends of justice will be met if 25% of the back

wages is granted in favour of the workman. Hence, it is

ordered:—

ORDER

The action of the management of Airport Authority

of India through its Airport Director, Nagpur in terminating

the service of workman Shri Ramesh Shankarrao Nandgave

w.e.f. 07.04.1999 is illegal and unjustified. The workman is

entitled for reinstatement in service with continuity and all

consequential reliefs and for 25% of back wages from

07.04.1999 to the date of his actual date of joining. The

party no.1 is directed to implement the award within 30

days of the publication of the award in the official gazette.

J. P. CHAND, Presiding Officer

ubZ fnYyh] 24 flrEcj] 2013

dkñvkñ 2305-—vkS|ksfxd fookn vf/kfu;e 1947 ¼1947

dk 14½ dh /kkjk 17 ds vuqlj.k esa dsUnzh; ljdkj eSllZ iqVdk

igkM ekbal vkQ ckydksa ftyk foykliqj ds izca/kra= ds lac)

fu;kstdksa vkSj muds deZdkjksa ds chp vuqca/k esa fufnZ"V vkS|ksfxd

fookn esa dsUnzh; ljdkj vkS|ksfxd vf/kdj.k ,oa Je U;k;ky;]

tcyiqj ds iapkV ¼lanHkZ la[;k 2 @ 1997½ dks izdkf'kr djrh gS tks

dsUnzh; ljdkj dks 23@9@2013 dks izkIr gqvk FkkA

[lañ ,y&43011@2@96&vkbZ vkj ¼,e½]

tksgu rksiuks] voj lfpo

New Delhi, the 24th September, 2013

S.O. 2305.—In pursuance of section 17 of the

Indusutrial Disputes Act, 1947 (14 of 1947), the Central

Government hereby publishes the award (Ref. No. 2/97) of

the Central Government Industrial Tribunal/Labour Court,

Jabalpur now as shown in the Annexure in the Industrial

Dispute between the employers in relation to the

management of M/s Phutkapahar Mines of Balco, District

(Bilaspur) and their workman, which was received by the

Central Government on 23/9/2013.

[No. L-43011/2/96-IR(M)]

JOHAN TOPNO, Under Secy.

ANNEXURE

BEFORE THE CENTRAL GOVERNMENT

INDUSTRIAL TRIBUNAL-CUM-LABOUR

COURT, JABALPUR

NO. CGIT/LC/2/97

PRESIDING OFFICER: SHRI R.B PATLE

The Secretary

Samyukta Khadan Mazdoor Sangh (AITUC),

Branch Phutkapahar Mines of Balco,

PO Balco Nagar,

Korba, Distt. Bilaspur

....Workman/Union

Versus

Mines Manager,

Phutkapahar Mines of Balco,

Po Balco Nagar,

Distt. Bilaspur (MP)

....Management

Á W A R D

Passed on this 24th day of July, 2013

1. As per letter dated 27-12-96 by the Government

of India, Ministry of Labour, New Delhi, the reference is

received. The reference is made to this Tribunal under

Section - 10 of I.D. Act, 1947 as per Notification No.

L-43011/2/96-IR (Misc). The dispute under reference relates

to:

"Whether the demand of Samyukta Khadan Mazdoor

Sang (AITUC), Branch Phutkapahar Mines for

payment of leave with wages to the contract labour

of Phutkapahar Mines by the contractors namely

M/s. Narmada Transport Associates, M/s. Sidhy

Construction Company and M/s. U.S. Agarwal for

the period of contract from 17-5-93 to 7-6-95, 1-8-94

to 1-7-95 and from 18-7-94 to 20-5-95 respectively

and by the management of BALCO, Korba @ one

day for every 20 day of work taking into the Unions

eligibility criteria as mentioned below is justified? If

so, to what relief the workmen are entitled to?"

Vide corrigendum dated 5-2-97, the following is added

in the schedule-

"Ëligibility Criteria: Leave with wages should be paid

to all the contract laboures, who have worked 2/3rd

of period of contract excluding Sundays and paid

Holidays from the period of contract.''

2. After receiving reference, notices were issued to

the parties. Ist party did not appear and participate in the

reference proceedings. 1st party is proceeded exparate on

6-7-07.

3. Management has not field Written Statement or

evidence though the case was repeatdely fixed. Therefore

6132

THE GAZETTE OF INDIA : OCTOBER 26, 2013/KARTIKA 4, 1935

[PART II—SEC. 3(ii)]

it appears that parties are not in dispute.

4. In the result, No dispute award is passed.

R.B. PATLE, Presiding Officer

ubZ fnYyh] 24 flrEcj] 2013

dkñvkñ 2306-—vkS|ksfxd fookn vf/kfu;e 1947 ¼1947

dk 14½ dh /kkjk 17 ds vuqlj.k esa dsUnzh; ljdkj eSllZ ch ds

bathfu;fjax dkiksZjs'ku fyñ fHkykbZ ,eñihñ ds izca/kra= ds lac)

fu;kstdksa vkSj muds deZdkjksa ds chp vuqca/k esa fufnZ"V vkS|ksfxd

fookn esa dsUnzh; ljdkj vkS|ksfxd vf/kdj.k ,oa Je U;k;ky;]

tcyiqj ds iapkV ¼lanHkZ la[;k 300 @ 1997½ izdkf'kr djrh gS tks

dsUnzh; ljdkj dks 23@9@2013 dks izkIr gqvk FkkA

[lañ ,y&29011@17@97&vkbZ vkj ¼,e½]

tksgu rksiuks] voj lfpo

New Delhi, the 24th September, 2013

S.O. 2306.—In pursuance of section 17 of the

Indusutrial Disputes Act, 1947 (14 of 1947), the Central

Government hereby publishes the award (Ref. No. 300/97)

of the Central Government Industrial Tribunal/Labour

Court, Jabalpur now as shown in the Annexure in the

Industrial Dispute between the employers in relation to the

management of M/s Beekay Engineering Corporation Ltd.,

Bhilai (MP) and their workman, which was received by the

Central Government on 23/9/2013.

[No. L-29011/17/97-IR(M)]

JOHAN TOPNO, Under Secy.

ANNEXURE

BEFORE THE CENTRAL GOVERNMENT INDUSTRIAL

TRIBUNAL-CUM-LABOUR COURT, JABALPUR

NO. CGIT/LC/R/300/97

PRESIDING OFFICER: SHRI R.B PATLE

Hindustan Steel Employees Union,

Bhilai, Affiliated to CITU,

Branch Dalli-Rajhara,

Distt. Durg

....Workman/Union

Versus

M/s. Beekay Engineering Corporation Ltd.,

45/47, Industrial Estate,

Bhilai (MP)

....Management

Á W A R D

Passed on this 26th day of July, 2013

1. As per letter dated 21-10-97 by the Government

of India, Ministry of Labour, New Delhi, the reference is

received. The reference is made to this Tribunal under

Section - 10 of I.D. Act, 1947 as per Notification

No. L-29011/17/97-IR (Misc). The dispute under reference

relates to:

Whether the action of the management of

M/s. Beekay Engineering Corporation a contractor

of I.O.C. of Bhilai Steel Plant in refusing employment

to Shri Ketu Ram and 45 other (as per list enclosed)

w.e.f. 20-1-96 is lawful and justified. If not, to what

relief the workmen are entitlted to?

2. 1st party Union is challenging refusal of

employment to Shri Ketu Ram and 45 others in the dispute

under reference. Even after issuing notices, the Union did

not participate in the proceeding, no statement of claim is

field. On 16-2-2010, case proceeded for filing Written

Statement by management.

3. IInd party management also not filed Written

Statement. From conduct of the parties, it is clear that the

parties are not pursuing or participating in the dispute.

4. In the result, award is passed as under:-

"Reference is disposed off as No Dispute Award".

R.B. PATLE, Presiding Officer

ubZ fnYyh] 24 flrEcj] 2013

dkñvkñ 2307-—vkS|ksfxd fookn vf/kfu;e 1947 ¼1947

dk 14½ dh /kkjk 17 ds vuqlj.k esa dsUnzh; ljdkj eSllZ eyat[kaM

dkWij izkstDV ftyk ckyk?kkV ds izca/kra= ds lac) fu;kstdksa vkSj

muds deZdkjksa ds chp vuqca/k esa fufnZ"V vkS|ksfxd fookn esa dsUnzh;

ljdkj vkS|ksfxd vf/kdj.k ,oa Je U;k;y;] tcyiqj ds iapkV

¼lanHkZ la[;k 112 @ 87½ izdkf'kr djrh gS tks dsUnzh; ljdkj dks

23@9@2013 dks izkIr gqvk FkkA

[lañ ,y&43012@37@85&Mh- III ¼ch½]

tksgu rksiuks] voj lfpo

New Delhi, the 24th September, 2013

S.O. 2307.—In pursuance of section 17 of the

Indusutrial Disputes Act, 1947 (14 of 1947), the Central

Government hereby publishes the award (Ref. No. 112/87)

of the Central Government Industrial Tribunal/Labour

Court, Jabalpur now as shown in the Annexure in the

Industrial Dispute between the employers in relation to the

management of M/s Malanjkhand Cooper Project, District

(Balaghat) and their workman, which was received by the

Central Government on 23/9/2013.

[No. L-43012/37/85-D.III (B)]

JOHAN TOPNO, Under Secy.

ANNEXURE

BEFORE THE CENTRAL GOVERNMENT INDUSTRIAL

TRIBUNAL-CUM-LABOUR COURT, JABALPUR

NO: CGIT/LC/R/112/87

PRESIDING OFFICER: SHRI R.B. PATLE

¹Hkkx II—[k.M 3(ii)º

Hkkjr dk jkti=k % vDrwcj 26] 2013@dk£rd 4] 1935

6133

The President,

Bhartiya Khanij Mazdoor Sangh (BMS),

PO Malanjkhand,

Distt. Balaghat

....Workman/Union

Versus

The Deputy General Manager, (P&A),

Malanjkhand Copper Project,

PO Malanjkhand,

Distt. Balaghat

AWARD

Passed on this 8th day of July, 2013

1. As per letter dated 14-7-87 by the Government of

India, Ministry of Labour, New Delhi, the reference is

received. The reference is made to this Tribunal under

Section-10 of I.D. Act, 1947 as per Notification No. L-43012/

37/87-D. III(B). The dispute under reference relates to:

2. ''Whether the action of the management of

Malanjkhand Copper Project PO Malanjkhand, Distt.

Balaghat in putting Shri P.K. Gupta, Compounder to the

minimum of the scale, stopping his two yearly increments

and cautioning him is justified? If not, to what relief the

concerned workman is entitled?"

3. After receiving reference, notices were issued to

the parties. Perusal of record shows that Union filed reply

on 23-8-88. The statement of claim by management if filed

at Page 4/1 to 4/3. The case of IInd party as per the Written

Statement is that objection is raised that the reference is

not tenable under I.D. Act. Dispute between parties relates

to the minimum punishment imposed on workman working

as Compounder. That the concerned workman is not an

employee under I.D. Act. Union has no right to take the

dispute. The reference is not tenable. It also prayed

opportunity to proving misconduct if the enquiry

conducted against workman is found illegal. That the Ist

party workman was employed as compounder. He was

found involved in unauthorized sale of medicines to retain

incentive medicine and theft of the medicines of the

Company's hospital. Chargesheet was issued to the

workman in addition to committing theft, pilferage, breach

of trust, dishonesty, fraud and willful negligence, taking

illegal gratification, misappropriation etc. the workman

replied the chargesheet. The Competent Authority decided

to hold enquiry against him. Enquiry Officer was appointed.

Delinquent Shri P.K. Gupta was given opportunity to defend

himself.

He was allowed to cross-examine the witnesses and

examine his own witness. That enquiry was properly

conducted. Workman was found guilty of the charges

considering the report of the Enquiry Officer and the

material submitted with report. Considering the gravity of

charges, minor punishment was imposed. Leniency was

shown. The punishment imposed is legal. IInd party prayed

for rejection of claim.

Workman/Union filed reply at Page 10/1 to 10/8. It is

submitted that the objection raised by Ist party about the

order of reference is not proper and bonafide. That the job

evaluation of workman of Malajkhand Copper Project has

been done in two instalments. In first instalment, job

evaluation of the technical workers have been done and

in the second instalment the same of the para medical and

clerical workers was done. In IInd instalment, job evaluation

of compounder has been included as workman and given

all benefits. It is contented that the reference is not bad. It

needs to be adjudicated by this Tribunal. Workman/ Union

being aggrieved by the punishment, whatsoever may be

its quantum, they have right to challenge by raising the

dispute. As per Section 11-A, if not opportunity is given

such enquiry found illegal is liable to be quashed. No

enquiry was made before awarding punishment. Therefore

it deserves to be quashed. The management is trying to

unnecessary complicate the matter raising superfluous and

unjustified objection as the dispute is referred to this

Tribunal by appropriate Government needs to be

adjudicated.

4. It is further submitted that Shri P.K. Gupta is

permanent employee of Malajkhand Copper Project. His

Code No. is 600. He was working as Compounder. There is

a store attached to the hospital of the MCP and medicines

are kept therein, Duties of compounder are well laid down.

The workman in question as a compounder is expected to

do his normal duties of compounder. Compounder is not

expected to lookafter the duties of store keeper. When any

employee is ordered to do any other duty other than his

prescribed duty, order is given in writing to avoid and

apprehension in future.

5. Medical officer in hospital has unauthorisely

ordered Shri P.K. Gupta to look after the work of hospital

store. It was not part of his duty as compounder. The person

giving the order was not competent to give such oral orders.

It is illegal. The employee cannot be charge of any

misconduct if he commits some mistake in doing their duty

because allotment of duty is illegal. Shri P.K. Gupta vide

chargesheet dated 10-7-82 was called upon to reply 4

charges levelled against him in respect of his so called

duty of looking after the store keeping and purchasing of

medicine, duties illegally allotted to him. Chargesheet was

issued by Dy. General Manager (P&A) who was not

competent authority to punish him. The substance of

allegations against him were (a) that he exported and

obtained commission @ 2% for purchase of medicines from

M/s. Nathmal Hukumchand Kankariya of Balaghat and

M/s. M.P. Medical Store Balaghat, (b) after purchasing a

packet of medicine for MCP Hospital from M/s. Hathmal

Hukumchand Kankarya, offered the same packet to the

said shopkeeper to keep it in his shop for sale, (c) such

activities were committed and selling company medicines

to the firms in order to earn wrongful gain for himself and

6134

THE GAZETTE OF INDIA : OCTOBER 26, 2013/KARTIKA 4, 1935

[PART II—SEC. 3(ii)]

cause loss to the company, (d) attempted to cause

disadvantage to the company and undue advantage to

himself by accepting medicines from firm under the incentive

scheme, (e) on stock verification on 1-7-82, some medicines

were found in excess and some in short and huge quantity

of medicines were found unaccounted in the store.

6. The charges against the delinquent employee were

about (i) theft, fraud, breach of trust and dishonesty, (ii)

willful negligence, (iii) Taking and attemption to take illegal

gratification, (iv) Mis-appropriation and commission of acts,

causing loss to the company. All the charges were denied

by the deliquent employee. Enquiry officer held the charge

of negligence in duties and store keeper was proved. That

charge of committing theft of medicines from store, Enquiry

Officer observed said charge was proved. Enquiry Officer

had also observed that the packet of medicines were kept

in the outer counter and same were surrendered to

Shri Kaul Vigilance officer during preliminary enquiry. That

the DGMPA referred the enquiry report to the Executive

Director who disagreed with the findings of the Enquiry

Officer and held all charges proved and directed

punishment against the delinquent. Vide order dated 23-7-

83, the Dy. General Manager (P&A) without making any

reference to the directions of the Executive Director issued

the order of punishment. The pay of delinquent was reduced

to the minimum of the scale regarding frist two charges, (2)

stoppage of 2 yearly increaments without cumulative effect

for other two charges, (3) warning that repetition of such

and similar mistake shall be very seriously viewed in future,

(iv) though suspension order was revoked with immediate

effect and nothing was mentioned about no treating the

suspension period on duty and payment of full pay during

the suspension period.

7. Ist party submits that enquiry officer rightly

observed in para-2 of his report that because the delinquent

was not given any opportunity to corss-examine these

persons, the delinquent could not be punished on the hear

say evidence. That there is no written order by the

Competent Authority to work as store keeper in addition to

his duties as compounder. That the competent authority

to punish the delinquent was the Executive Director. No

theft could have committed by the delinquent when he has

stated that materials were kept in rack of the outside counter

and produced before the Vigilence Officer. It is submitted

that the statement of Miss Rosamma Joseph, Lab

Technician could not be relief as her statement is false. On

such ground, Ist party prayed that the order of punishment

is illegal. It deserves to be set aside.

8. Considering pendings on record, the points which

arise for my consideration and determination are as under.

My findings are recorded against each of them for the

reasons as below:-

(i) Whether the action of the

In Affirmative

management of Malanjkhand

Copper. Project PO Malanjkhand,

Distt. Balaghat inputting, Shri P.K.

Gupta, Compounder to the

minimum of the scale, stopping his

two yearly increments and

cautioning him is legal?

(ii) if so, what relief the workman

Relief prayed by

is entitled to

workman is rejected.

REASONS

9. Though legality of punishment imposed against

Shri P.K. Gupta is challenged by the Union, no evidence is

adduced by Union to substantiate his claim. The evidence

of Union was closed on 13-7-05. The perusal of record

shows that case was frequently adjourned for exparte

evidence of management form 19-10-05 to 1-3-2013. The

management did not adduce any evidence. Thus both

parties failed to participated in the reference proceeding.

Form pleadings on record, it appears that legality of enquiry

proceeding was contended by the management and it was

denied by the Union. However as parties failed to adduce

evidence, dispute between parties cannot be decided

without evidence. Therefore as parties failed to participate

in proceeding, I hold my finding in Point No. 1 in Affirmative

as Ist party failed to establish his contention.

10. In the result, award is passed as under:—

1. The action of the management of Malanjkhand

Copper Project PO Malanjkhand, Distt. Balaghat inputting

Shri P.K. Gupta, Compounder to the minimum of the scale,

stopping his two yearly increments and cautioning him is legal.

2. Relief prayed by Wrokman is rejected.

R. B. PATLE, Presiding Officer

ubZ fnYyh] 24 flrEcj 2013

dkñvkñ 2308-—vkS|ksfxd fookn vf/kfu;e 1947 ¼1947

dk 14½ dh /kkjk 17 ds vuqlj.k esa dsUnzh; ljdkj eSllZ lheaV

dkjiksjs'ku vkQ bafM;k ftyk jk;iqj ds izca/kra= ds lac) fu;kstdksa

vkSj muds deZdkjks ds chp vuqca/k esa fufnZ"V vkS|ksfxd fookn esa

dsUnzh; ljdkj vkS|ksfxd vf/kdj.k ,o Je U;k;y;] tcyiqj ds

iapkV ¼lanHkZ la[;k 144@87½ dks izdkf'kr djrh gS tks dsUnzh; ljdkj

dks 2@8@2013 dks izkIr gqvk FkkA

[lañ ,y&29011@18@84&Mh- III¼ch½]

tksgu rksiuks] voj lfpo

New Delhi, the 24th September, 2013

S.O. 2308.—In pursuance of Section 17 of the

Industrial Disputes Act, 1947 (14 of 1947), the Central

¹Hkkx II—[k.M 3(ii)º

Hkkjr dk jkti=k % vDrwcj 26] 2013@dk£rd 4] 1935

6135

Government hereby publishes the Award (Ref. No. 144/87)

of the Central Government Industrial Tribunal/Labour

Court, Jabalpur now as shown in the Annexure in the

Industrial Dispute between the employers in relation to the

management of M/s. Cement Corporation of India, District

(Raipur) and their workman, which was received by the

Central Government on 02.08.2013.

[No. L-29011/18/84-D. III(B)]

JOHAN TOPNO, Under Secy.

ANNEXURE

BEFORE THE CENTRAL GOVERNMENT

INDUSTRIAL TRIBUNAL-CUM-LABOUR COURT,

JABALPUR

NO. CGIT/LC/R/144/87

Presiding Officer: Shri R. B. PATLE

General Secretary,

Cement Awam Khadan Kamgar Sangh (BMS),

PO Mandhar Cement Factory,

Distt. Raipur (MP)

...Workman/Union

Versus

General Manager,

Cement Corporation of India,

PO Mandhar Cement Factory,

Distt. Raipur

...Management

AWARD

Passed on this 17th day of May 2013

1. As per letter dated 14-8-1987 by the Government

of India, Ministry of Labour, New Delhi, the reference is

received. The reference is made to this Tribunal under

Section-10 of I.D. Act, 1947 as per Notification No.L-29011/

18/84-D.III(B). The dispute under reference relates to:

"Whether the action of the management of Cement

Corporation of India Ltd. in retrenching their

workmen employed through their contractors M/s

Ahuja Constyruction and M/s Anil Transport Co.

without following the provisions of I.D. Act and Rules

and debarring the workman from payment of wages

and other benefits in terms of Cement Wage Award,

1983 is justified? If not, to what relief the workmen

are entitled?"

2. After receiving reference, notice were issued to

the parties. Ist party General Secretary of Cement Awam

Khadan Kamgar Sangh (BMS) Mr. S.N. Prasad filed

statement of claim at Page 3/1 to 3/3 of the record. The

Case of the Ist party workman is that the retrenched

workman as shown in list Annexure-A were workmen of

Cement Corporation of India, Mandhar Cement Factory,

Pathri Mines i.e. IInd party. That various contractors were

changed from time to time during the period 1977-78 till the

date of retrenchment of labour. That the retrenched

workman were always putting their demands to the Principal

Employer i.e. Cement Corporation of India Ltd., Cement

Factory and their respective contractors. They were

requesting wages and other benefits as per Cement Wage

Board Award 1983. Their demands were deliberately denied

by the Principal Employer and contractors. The retrenched

workmen were not paid minimum wages and other benefits

as per Cement Wage Board Award time to time.

3. It is further submitted that the retrenched workman

are regular workman of Cement Corporation of India Ltd.,

Cement Factory—Principal Employer. They were working

in Pathri Mines from 1977-78 under various contractors of

IInd party. The nature of work is regular process/permanent

nature of job which is directly connected with production

of cement. However to escape from responsibility to

regularize/departmentalize the labourers the principal

employer deliberately kept the labourers through

contractors. The said act of the IInd party is in violation of

Cement Wage Board Award 1983 and rules of Government

of India.

4. The Captive Mines of Cement Corporation of India

Ltd., Mandhar Cement Factory, Pathri Mines is within

10 Kms. distance from the Bank. As per provisions of

Cement Wage Board Award, 1983, to be implemented for

Pathri Mines Labours. However to exploit labours, IInd

party CCI, Mandhar Cement Factory management

intentionally violated the said award and the rules. Despite

of various letters of demand to the Principal Employer at

contractor, Asstt. Labour Commissioner and other

authorities, no attention was paid. The dispute raised by

retrenched workman during their service period were

violated. The retrenched employees lodged their claims

under Section 33(C) (2) of I.D.Act, 1947 for arrears of Cement

Wage Board Award 1983 for the base 1982-83 and 83-84.

The Principal Employer IInd party was irritated because of

filing of proceeding. The machines were used instead of

labour and the imployees were retrenched causing them

unemployed.

5. That Principal Employer or the contractors not

followed the procedure for retrenchment of the workman

provided under Section 25-F, G, H of the I.D. Act. The

retrenchment of workman is illegal. Rather it is alleged to

be act of victimization by the employer.

6. It is further contented that illegal change by

reducing strength of labours, use of machines at Mines.

Secondly the labours are retrenched. It is nothing but

denial of justice to the poor labours by management. That

due to illegal retrenchment, the labours are denied wages,

benefits under Wage Board Award 1983. That Principal

Employer is solely responsible for payment of wages and

6136

THE GAZETTE OF INDIA : OCTOBER 26, 2013/KARTIKA 4, 1935

[PART II—SEC. 3(ii)]

other benefits to the retrenched labours. That the cases

relating to the payment of arrears are pending before this

Tribunal. The management of IInd party and the contractors

are party to said proceedings. During pendency of said

proceeding, service conditions of labours cannot be

changed without permission of Labour Court, no such

permission was obtained by management or contractors

for retrenchment. Therefore it is alleged that the

retrenchment is illegal. It is an malafide act and victimization

on above pleadings. Ist party Union prays for reinstatement

of retrenched labours, wage benefits as per Cement Wage

Board Award 1983 from Principal Employer, Mandhar

Cement Factory from date of retrenchment till decision of

the matter.

7. List Annexure-A shown names of 109 retrenched

employees of M/s Ahuja Contractor and names of 164

retrenched labours of M/s Anil Transport company, names

of 33 retrenched employees of M/s Vardhman Construction

Company, CCI Ltd. Mandhar Cement Factory, Pathri Mines.

8. IInd party management filed Written Statement at

page 4/2 to 4/6 of the record. IInd party submitted

preliminary objection that is has not passed any order for

retrenchment of the labours. Therefore it is not possible

for me to offer any justification for passing such order.

That the order of reference passed by Central Govt. is of

erroneous assumption. The names of the retrenched

employees are not appearing in the order of reference. That

employees were not in effective control of the IInd party.

The contractors were in effective control and pay musters

of the employees. The contractor along could engage and

terminate service of the employees. Therefore the liability

cannot be fastened on the IInd party as there is no

relationship of employer and employee. That the dispute

between parties has not been reflected in the order of

reference. The reference is ultra...... on the part of Central

Government, no adjudication proceeding can therefore take

place in respect of the reference.

9. That as per the recitals of the reference order,

industrial dispute exists between the parties. However the

order of reference does not disclose the names of persons

alleged to have been retrenched. In absence of their names

in reference, there cannot be adjudication. The names of

contractors are not arrayed as party in the reference.

Therefore this Tribunal is precluded from adjudication of

dispute about relationship of employer and employee. The

reference in present form is imperfect, improper and contrary

to the facts and law. Therefore no adjudication shall remain.

10. On merit, IInd party submits that IInd party had

awarded contracts to various contractors for work at Parthi

Mines of Mandhar Cement Factory. IInd party did not

retrench any labour. IInd party was claiming that the labours

supplied by the contractors were paid wages as per the

rules and regulations payment of Wages Act, Minimum

Wages Act. It is further submitted that the labours engaged

by contractor are migratory in nature. There was no occasion

for management to retrench any employees. The retrenched

employees were never engaged by IInd party. It is denied

that those employees were regular workman of IInd party.

That time to time settlements were raised between contract

labours and contractors before the authorities. It is not

disputed that application under Section 33(C)(2) of I.D.

Act, 1947 is pending for adjudication. It is submitted that

said applications were dismissed on 19-11-84 consequent

to settlement arrived between labours and contractors

before ALC(C).

11. IInd party admits that it had taken policy decision

to mechanized mine work. It denies that any procedure was

required to be followed by the IInd party. It is denied that

alleged retrenched workman shown in para-6 of the

Statement of Claim any procedure was required to be

followed for retrenchment by the IInd party. It is denied

that any procedure relating to Payment of Wages Act is

pending. It is submitted that prayers made on behalf of

alleged retrenched workman is wrong. IInd party

management prays for rejection of the demands.

12. 1st party workman submitted rejoinder at Page

5/1 to 5/5. 1st party submits that as per decisions of the

Hon'ble Supreme Court and High Courts, the Principal

Employer is the employer of the contract labours also. The

contractor has no independent entity. That IInd party CCI,

Mandhar Cement Factory is Principal Employer of the

retrenched labours. Retrenched labours were regularly

engaged through various contractors by IInd party during

the period 1977-78. The contractors were changed but

labours were not changed till their retrenchment. The work

is of regular nature such as packing house loading and

unloading contract labours and coal, gypsum (Raw Material

Handling) contract labourers. Contract Labours were paid

wages and other all benefits as per provisions of Cement

Wage Board Award 1983. There work load has been fixed in

comparison of minimum wages under said award. The

nature of mines work is of regular process and work is of

permanent nature directly related with production of

cement. In order to avoid benefit of award, management of

IInd party, retrenched labours. The labours were

deliberately kept under contractor. IInd party CCI Ltd. at

Mandhar Cement Factory are responsible for illegal

retrenchment. That the contractors are only medium for

exploitation of the workmen.

13. It is submitted that CCI, Mandhar Cement Factory

is situated within 10 Kms. from Factory. As per provisions

of Cement Wage Board Award 1983, the award should be

implemented in captive mines situated within the said

distance for the contract labours also. The management of

IInd party did not implement the same Wage Board Award.

¹Hkkx II—[k.M 3(ii)º

Hkkjr dk jkti=k % vDrwcj 26] 2013@dk£rd 4] 1935

6137

The labours gave 7 points charter of demands of IInd party.

The IInd party and Cement Contractors had lodged claim

for payment of minimum wages as per said award. In order

to take revenge, the Pathri Mine was mechanized. Due to

mechanization, employment of 400 labours were illegally

retrenched. It is alleged that IInd party has made illegal

change by reducing strength of labour.

14. The retrenched labours Pathri Mine has put up

demand for implementation of award. As per letters dated

19-9-83, 26-9-83, 5-10-83, 20-10-83, 26-10-83, 8-11-83, 29-11-

83, 10-12-83 and 8-12-83 to the different authorities, IInd

party and the contractors. However there was no response

to their demands. The retrenched labours lodged their claim

before this Tribunal filing cases 221 to 231 under Section

33(C)(2) of I.D. Act.

15. The Ist party workman reiterated its claim for

reinstatement of retrenched labours and recovery of arrears

of wages as per Cement Wage Board Award 1983.

16. Considering pleadings between parties, my

learned predecessor has framed issues on 30-12-88 which

are as under. My findings are recorded against each of

them for the reasons as below:—

(i)

Whether the persons alleged to have

Retrenched employees were engaged by contractors.

been retrenched were employed by

the contractors named in the terms

of reference?

(ii)

Whether their exists any dispute

In Negative

between CCI and retrenched

workmen?

(iii)

Whether there existed any relationship

The relationship between retrenched e mployees is

of employer and employee between

only towards employed by contractor as provided

the parties as per terms of reference?

under Section 21 of Contract Labour (Regulation &

Abolition) Act, 1970.

(iv)

Whether the action of the management

Management of IInd party has not retrenched the

of Cement Corporation of India Ltd.

employees employed by contractors.

in retrenching their workmen employed

through their contractors M/s. Ahuja

Construction and M/s. Anil Transport

Co. without following the provisions

of I.D. Act and Rules?

(v)

Whether debarring the workmen

Employees have not been debarred from claiming

from payment of wages and other

wages as per Cement Wage Award 1983

benefits in terms of Cement Wage

Award 1983 is justified?

(vi)

Costs and Relief.

Relief prayed by Ist party/retrenched employees is

rejected.

REASONS

17. Issue No. 1 to 3:—

Issue No. 1 pertains to whether the persons alleged

to have been retrenched were engaged by contractors.

The statement of claim submitted by Ist party Union shows

three lists of 109 employees working with Ahuja contractor

and 164 employees working with M/s Anil Transport, 30

employees working with M/s Vardhman contractors.

However in the statement of claim, the employees claims

that the contractors were changing. The labours remained

same. The labours were doing the work connected with

production. 1st party Union filed affidavit of labours

Fekuram Verma, Manmodhi Mehtar, Ratiram Nishad,

Dhanau Verma. Dhalsingh Sahu, Khorbahara Verma, Shyam

Rattan Satnami, Mahesh Sahu and Naresh Verma. All of

them have stated in their affidavit that since 1977-78, in

February 1984 they were working in the Mine. That they

were considering CCI as their employer as they could not

be removed by contractor without order of CCI. In their

cross-examination, they have stated identically that they

were working with different contractors. First contractor

was Akhraj Company,next was Karamal, thereafter

Nemichand. Then Balmukund, then Ahuja then Jairam,

Naharji ad Ashok and Anil. All these witnesses are stating

that they were working through contractors. The Secretary

6138

THE GAZETTE OF INDIA : OCTOBER 26, 2013/KARTIKA 4, 1935

[PART II—SEC. 3(ii)]

of the Union Shri S.N. Prasad filed his affidavit. He has

stated that the contractors did not pay wages as per Wage

Board Award 1983 despite of repeated requests and

representations. In his cross-examination, Mr. Prasad

Secretary of the Union says that management has not given

any appointment letter to the workers. Mine supervisor of

the management and also the contractor supervisor used

to remain present at time of payment of the workers. The

supervisors of lower cadre of management along with

contractor supervisor used to supervise the work. Mining

Supervisor or Foreman or Time Mining Engineer used to

supervise the workers. The affidavits filed by management

witness Ram Mitra Pandey, Suresh Prasad Tiwari, Rajendra

Kumar Gupta and C.B. Agrawal have also stated the workers

were engaged by contractors.

18. Section 21 of Contract Labour (Regulation and

Abolition) Act, 1970 provides—

"(i)

A contractor shall be responsible for payment

of wages to each worker employed by him as

contract labour and such wages shall be paid

before the expiry of such period as may be

prescribed.

(ii)

Every principal employer shall nominate a

representative duly authorized by him to be

present at the time of disbursement of wages

by the contractor and it shall be the duty of

such representative to certify the amounts paid

as wages in such manner as may be prescribed.

(iii)

It shall be the duty of the contractor to ensure

the disbursement of wages in the presence of

the authorized representative of the principal

employer.

(iv)

In case the contractor fails to make payment of

wages within the prescribed period or makes

short payment, then the principal employer

shall be liable to make payment of wages in full

or the unpaid balance due, as the case may be,

to the contract labour employed by the

contractor and recover the amount so paid from

the contractor either by deduction from any

amount payable to the contractor under any

contract or as a debt payable by the

contractor."

19. From evidence discussed above and Section 21

of the Contract Labour (Regulation and Abolition) Act,

1970 verbatim reproduced above, it is clear that that the

retrenched employee shown in all the three sheets annexed

with the statement of claim were employed by the

contractors except the Principal employer i.e. IInd party

was concerned only to supervise the payment of wages

and in case of non-payment or short payment of wages to

make it good and pay same to the contractors labours.

There is no relationship of employer and employee between

the IInd party CCI and the retrenched employees engaged

by the contractors. For above reasons, I accordingly record

my finding on Point No. 1 & 3 and Point No. 2 in Negative.

20. Point No. 4 & 5—

Issue No. 4 covers the controversy between parties

whether the action of the management of CCI in retrenching

the workman employed through contractors Ahuja

Construction, M/s Anil Transport is without following

provisions of I.D. Act. As contented in its Written

Statement, IInd party has submitted that M/s Ahuja

Construction and Anil Transport are not made party as per

the terms of reference. The names of employees are not

shown in the reference made by the Central Government. It

is, therefore, submitted that in its absence, the reference

cannot be decided by this Tribunal. The reference made by

Central Government finds reference to the employees

retrenched through Contractors M/s Ahuja Construction

and M/s Anil Transport Co. the names of the employees

are disclosed in the annexure submitted along with

statement of claim. Ahuja Construction and Anil Transport

Company are not shown parties to the dispute under

reference.

21. However the evidence of the witnesses on

affidavit submitted by Ist party Union is on the point that

the retrenched employees were working from 1977-78 till

February, 1984 through contractors. That they were not

paid wages as per Cement Wage Board Award 1983. That

they were doing the work of digging stones used for

production of cement. When they claim wages as per

Cement Wage Board Award 1983, IInd party mechanized

the mines. After retrenchment they are rendered

unemployed. The evidence in cross-examination of witness

Manmodhi Mehtar says that Shri Ashok and Anil were last

contractor when they were working. He was stopped from

work in 1984, he was not given notice. He stopped from

working by contractor. Ratiram in his cross-examination

says that he was employed by Shri Aharaj and stopped

working in 1984. The contractor used to pay his wages. He

claims ignorance about his relation between the Union and

the management of IInd party. Witness Dhannu Verma in

his cross-examination says that he was working in Pathri

Mines from 77-78. He was given to understand he was

working under supervision of CCI. The contractors were

changed. Last contractor was Ahuja Transport. Wages were

paid to him by contractor. Contractor has not stopped work

but CCI stopped him from working because the machines

belonging to the company were taken back.

22. Witness Dhal Singh Sahu in his cross-examination

says contractor employed at the instance of CCI. He did

not recollect the name of Ist contractor. Last was Anil

Transport. He was paid by CCI through supervisor of

contractor. He was stopped working from February. 1984.

Similar statement is given by other witnesses Khorbahara

Verma, Shyamrattan Satnami and Naresh Verma. Secretary

of the Union Shri S.N. Prasad in his cross-examination says

¹Hkkx II—[k.M 3(ii)º

Hkkjr dk jkti=k % vDrwcj 26] 2013@dk£rd 4] 1935

6139

that 7 points of demands were raised before management.

Contractor was given copy of demand. M/s Ahuja

Construction, Anil Transportation were in the year 1982-

83. He made statement on the basis of perusal of record. As

per document Exhibit M-1, Anil Transport worked for

development of cities meaning removal of overburden. After

the machine were deployed, workman were stopped. In his

further cross- examination, this witness says that he has

no evidence to show that contractor had given notice that

they shall make payment according to Wage Board Award

1983. The notice was displayed on notice board. He denies

that distance between Pathri Mines and Factory is 11 Kms.

According to him, the distance is 8 kms. That he has not

maintained record except the records of workers during

relevant period working with the contractors. A note is to

be taken that in his cross-examination, Para-16 says that he

had given details of workman in application under Section

33(C)(2) and not in this case. I will discuss the evidence of

management's witnesses at later part of the judgment.

23. It would be appropriate to first discuss the

documents produced on record. From evidence of

management's witness Shri Parsadiram Verma, Patwari Halka

No. 95, the Map Exhibit W-23 is proved. As per his evidence,

distance between factory and Mandhar Mine is 10.114 Kms.

In his cross-examination, he has shown the points from

which he had carried the measurements. His evidence is

not shattered to disbelieve his testimony. In Exhibit

W-1, 2, 3 the Union had submitted demands for payment of

wages as per Cement Wage Board Award 1983 to contractor

M/s Ahuja Construction and Anil Transportation working

in CCI Mines, Mandhar. Exhibit W-4 produced by 1st party

shows the Union had submitted demand for wages.

Similarly demands were submitted as per document Exhibit

W-5. As per document Exhibit W-6, Anil Transport had

agreed to pay the wages till 5-10-83. As per document Exhibit

W-7 & W-8, the demands for payment of wages were

submitted before ALC for conciliation under different

letters. The demands were also submitted as per Exhibit

W-9 for conciliation. Notice as per Exhibit W-10 was issued.

The ALC had issued notice for conciliation Exhibit W-12,13

& 14.

24. In Exhibit W-19, there is reference that contractors

informed that they were awarded contract for a fixed period

of time which will be expiring on 7-2-84. However they were

ready to pay all the legal dues of the workman as per rules

and regulations. The failure reports in conciliation

proceedings are produced at Exhibit W-20, 21.

25. Documents M-1 is the copy of Agreement Exhibit

M-3 is the tendor form containing different clauses for

payment of wages to the labours engaged by the contractor

and liability of the employer as provided under provisions

of Contract Labour (Regulation and Abolition) Act, 1970.

Management has produced document Exhibit M-4 notice,

copies of wage sheets are produced with Exhibit M-5.

Exhibit M-7 is settlement arrived between Ahuja

Contractors. It was settled to pay Rs. 71,000 towards full

and final settlement. The payment was to be made within

15 days. Union agreed to withdraw the case filed under

Section 33(C)(2) before this Tribunal. The pleadings and

evidence of 1st party Union and evidence of all the

witnesses of 1st party is silent with respect to the said

settlement. Copy of Cement Wage Board Award, 1983 is

produced on record finds clear refers that benefit is also

extended to contract labour as per demand No. 219. The

coverage area of the concerned wage board award is 10

Kms. distance as per discussion in para 73 of the Wage

Board Award. As per para 50 of the award, the Wage Board

has made it clear that the recommendation would apply to

workers who are engaged by contractors where such

employees are on construction work and purely connected

with production.

26. The evidence of management witness Shri

Rajendra Gupta deals with the Tripartite settlement dated

16-10-84 before ALC(C). Agreements were signed between

the Union and M/s Anil Transport Company. Payment made

by contractors of workman were through payment sheet

Exhibit M-5, 6. Exhibit M-8 is the settlement dated 9-4-84.

Exhibit M-7 is settlement between the Union and

management of Anil Transport. Evidence on above point

is not shattered in cross-examination. The witness in his

cross-examination says that the supervisors of management

was remaining present at the time of payment of wages to

contract labours. Shri C.B. Agrawal management witness

in his evidence also stated that the supervisor of contractor

and the representative of the management used to remain

present at the time of payments to the contract labour.

That Parthi Mine is situated at a distance of 11 Kms. from

Factory. He admits that representative of management was

remaining preset at the time of payment to contract labours.

In his cross-examination, he submits that distance between

factory and the mine is more than 11 Kms. Their evidence

is corroborated from evidence of Shri Parsadiram Verma,

Patwari Halka No. 95 and the Map Exhibit W-23. From

document Exhibit M-7, it is clear that the proceeding under

Section 33(C)(2) for recovery of wages as per Cement Wage

Board Award, 1983 were filed. The copy of judgment of

proceedings under Section 33(C)(2) are not produced.

During course of argument, it was given to understand

that those proceedings were rejected long back. Though

there is no pleading about resjudicata in this case but once

the claim of the contractors was for payment of wages as

per Wage Board Award was not allowed. As per settlement

Exhibit M-7, the claim was settled before ALC and it was

agreed to withdraw these cases. The claim of 1st party

cannot be entertained. In notes of argument submitted on

behalf of Union has not explained the point how their claim

for wages as per Cement Wage Board Award 1983 is

tenable, even after settlement Exhibit M-7 and Union, it

was agreed to withdraw the cases under Section 33(C)(2).

The pleadings and evidence of Union is silent with respect

to the judgments in those proceedings. For the above

6140

THE GAZETTE OF INDIA : OCTOBER 26, 2013/KARTIKA 4, 1935

[PART II—SEC. 3(ii)]

reasons, the claim of 1st party for wages as per Cement

Wage Board Award 1983 cannot be accepted against IInd

party Principal employer. The contractors M/s. Ahuja

Transport and M/s. Anil Transport are not joined as parties.

There is no evidence as to how much amount as per

settlement Exhibit M-7 was paid or how much amount

remained unpaid. The liability cannot be fastened for its

payment on the Principal Employer i.e. IInd party.

27. With respect to the contentions of the Union that

machines were employed to render contractors employees

jobless, the change is alleged to be illegal. The present

reference does not clearly refer to illegal change, rather the

employees shown in the list annexed with statement of

claim are not regular employees of the IInd party

management. They are shown employees of the contractor.

Section 9-A of I.D. Act provides for 21 days notice for

change does not cover change with respect to the services

of the labours engaged by the contractors.

28. So far as legal position with respect to employees

engaged through contractor, the renewal of licence is

produced on record. The liability of the Principal Employer

is restricted to the points covered under Section 21(2), (4)

of Contract Labour (Regulation and Abolition) Act, 1970.

The employees engaged by the contractor for the work

assigned under Contract cannot be said employees of the

Principal Employer. Their services cannot be terminated by

Principal Employer. The evidence in this case also does

not show that the contractors employees shown in the list

annexed with statement of claim were retrenched by the

Principal Employer. M/s. Ahuja Construction and Anil

Transportation are not made parties. Therefore in absence

of the se-contractor, it cannot be held that the alleged

retrenchment of the contractors employees is in violation

of Section 25-F,G of I.D. Act. For above reasons, I record

my finding on Point No. 4 & 5 in Negative.

29. In the result, award is passed as under:—

"The reference is answered in favour of the

management. The claim of the 1st party Union is

rejected."

R.B. PATLE, Presiding Officer

ubZ fnYyh] 24 flrEcj] 2013

dkñvkñ 2309-—vkS|ksfxd fookn vf/kfu;e] 1947 ¼1947

dk 14½ dh /kkjk 17 ds vuqlj.k esa dsUnzh; ljdkj eSllZ ,eñ ihñ

LVsV ekbfuax dkiksZjs'ku ftyk fcykliqj ds izca/kra= ds lac) fu;kstdksa

vkSj muds deZdkjksa ds chp vuqca/k esa fufnZ"V vkS|ksfxd fookn esa

dsUnzh; ljdkj vkS|ksfxd vf/kdj.k ,oa Je U;k;ky;] tcyiqj ds

iapkV ¼lanHkZ la[;k 159@93½ dks izdkf'kr djrh gS tks dsUnzh; ljdkj

dks 23@9@2013 dks izkIr gqvk Fkk A

[lañ ,y&29012@53@92&vkbZvkj ¼,e½]

tksgu rksiuks] voj lfpo

New Delhi, the 24th September, 2013

S.O. 2309.—In pursuance of Section 17 of the

Industrial Disputes Act, 1947 (14 of 1947), the Central

Government hereby publishes the Award (Ref. No. 159/93)

of the Central Government Industrial Tribunal/Labour

Court, Jabalpur now as shown in the Annexure in the

Industrial Dispute between the employers in relation to the

management of M/s M.P. State Mining Corporation, District

(Bilaspur) and their workman, which was received by the

Central Government on 23/9/2013.

[No. L-29012/53/92-IR (M)]

JOHAN TOPNO, Under Secy.

ANNEXURE

BEFORE THE CENTRAL GOVERNMENT

INDUSTRIAL TRIBUNAL -CUM-LABOUR COURT,

JABALAPUR

NO. CGIT/LC/R/159/93

Presiding Officer: SHRI R.B. PATLE

General Secretary,

M.P. Koyla Swatntra Mazdoor Sangthan,

Baradwar, PO Baradwar,

Distt. Bilaspur

....Workman/Union

Versus

Deputy General Manager (Mines),

M.P. State Mining Corporation,

Sub Office-Baradwar, PO Baradwar,

Distt. Bilaspur.

....Management

AWARD

Passed on this 23rd day of July, 2013

As per letter dated 19.8.93 by the Government of

India, Ministry of Labour, New Delhi, the reference is

received. The reference is made to this Tribunal under

Section-10 of I.D. Act, 1947 as per Notification No. L-29012/

53/92-IR(Misc). The dispute under reference relates to:

"Whether the action of the management of M.P. State

Mining Corporation Ltd. justified in not regularizing

S/Shri Babulal Yadav, Jageshwar Singh and Har

Narayan Singh as Lower Division Clerks w.e.f.

10.10.84"

2. After receiving reference, notices were issued to

the parties. Ist party submitted Statement of claim at page

4/1 to 4/2. The case of workman is that he was appointed

on post of LDC on 9.8.93. That their initial appointment

was as office helper. The dates of their appointment are

29.9.75, 1.2.77, 16.12.77, they were regularized as Office

Asstt. from 1.3.84 to 18.10.84, 19.10.84 in pay scale of

Rs. 485-740. The workman Babulal Yadav has passed High

Secondary Examination in 1975, workman Jageshwar Singh

passed Higher Secondary in 1982 and workman Harnarayan

¹Hkkx II—[k.M 3(ii)º

Hkkjr dk jkti=k % vDrwcj 26] 2013@dk£rd 4] 1935

6141

Singh passed in 1981. That as per order dated 2.3.89, they

were appointed in pay scale of Rs. 870-1420. That Ist party

workman No. 1 to 3 were promoted. The workman No. 2

was appointed in September 93 after long delay as LDC. It

is further submitted that because of delay in his

appointment, Ist party workman suffered financial loss of

Rs. 51,000, 41,000 respectively. On such ground, Ist party

workman prays for regularization of their service.

3. IInd party filed Written Statement at Page 13/1. It

is submitted that the dispute was referred in 1993. In the

year 2000, the Mining Corporation of MP was reconstituted

after division of State of MP and Chhattisgarh. The Mining

Corporation Chhattisgarh is not concerned with the dispute.

The dispute relates to M.P. State Mining Corporation. MP

Mining corporation has not filed Written Statement even

after service of notice. The reference is proceeded exparte.

4. Ist Party workman 1 to 3 are claiming regularization

on the post of LDC w.e.f. 10.10.84. However workman

proceeded exparte on 26.8.05. No evidence is adduced by

workman. The MP Mining Corporation has also filed

Written Statement, no evidence is filed. Thus both parties

failed to participate in the reference proceeding. Therefore

both parties failed to participate in the reference proceeding

therefore no dispute award needs to be passed.

Accordingly the award is passed as under:—

"As parties failed to participate in reference

proceeding, no dispute award is passed."

R. B. PATLE, Presiding Officer

ubZ fnYyh] 24 flrEcj] 2013

dkñvkñ 2310-—vkS|ksfxd fookn vf/kfu;e] 1947 ¼1947

dk 14½ dh /kkjk 17 ds vuqlj.k esa dsUnzh; ljdkj eSllZ eSxuht

vksj bafM;k fyñ] ukxiqj ds izca/kra= ds lac) fu;kstdksa vkSj muds

deZdkjksa ds chp vuqca/k esa fufnZ"V vkS|ksfxd fookn esa dsUnzh;

ljdkj vkS|ksfxd vf/kdj.k ,oa Je U;k;ky;] tcyiqj ds iapkV

¼lanHkZ la[;k 63@2000½ izdkf'kr djrh gS tks dsUnzh; ljdkj dks

23@9@2013 dks izkIr gqvk FkkA

[lañ ,y&27012@4@99&vkbZvkj ¼,e½]

tksgu rksiuks] voj lfpo

New Delhi, the 24th September, 2013

S.O. 2310.—In pursuance of Section 17 of the

Industrial Disputes Act, 1947 (14 of 1947), the Central

Government hereby publishes the award (Ref. No. 63/2000)

of the Central Government Industrial Tribunal/Labour

Court, Jabalpur now as shown in the Annexure in the

Industrial Dispute between the employers in relation to the

management of M/s. Manganese Ore India Ltd., Nagpur

and their workman, which was received by the Central

Government on 23.9.2013.

[No. L-27012/4/99-IR(M)]

JOHAN TOPNO, Under Secy.

ANNEXURE

BEFORE THE CENTRAL GOVERNMENT

INDUSTRIAL TRIBUNAL-CUM-LABOUR COURT,

JABALPUR

No. CGIT/LC/R/63/2000

Presiding Officer : Shri R. B. PATLE

General Secretary,

Republican Mazdoor Sangathan,

Manganese Mines, Bharveli,

Distt. Balaghat

....Workman/Union

Versus

The Chairman-cum-Managing Director,

M/s. Manganese Ore India Ltd.,

3, Mount Road Extention,

Nagpur

....Management

AWARD

Passed on this 17th day of July 2013

1. As per letter dated 6.3.2000 by the Government of

India, Ministry of Labour, New Delhi, the reference is

received. The reference is made to this Tribunal under

section-10 of I.D. Act, 1947 as per Notification No. L-27012/

4/99-IR (Misc). The dispute under reference relates to:

"Whether the demand raised by Shri Sevakram and

20 other against the management of Manganese Ore (India)

Ltd. vide their representation dated 17.3.99 (Annexure I) is

justified? If not, to what relief the concerned workmen are

entitled?"

2. After receiving reference, notices were issued to

the parties. Ist party Union filed statement of claim at Page

3/1 to 3/4. The case of Ist party Union is that management

issued orders dated 3.8.98 appointing certain workmen as

Fieldman. Accordingly 21 members of the Union were

appointed to the post of Fieldman by management of IInd

party.

All those workmen were appointed on probation.

During the probation period, they were working with

honesty, integrity, efficiently. That considering their past

service record and devotion towards duty, they were

appointed by the management as Fieldman. On 14-2-99,

they received intimation that their appointment as Fieldman

was wrongly made. The management had reviewed their

appointments and several discrepancies and mistakes were

found in the matter of their appointment. Therefore their

appointment as Fieldman were cancelled. All those 21

workmen were sent to their original status of piece rated

workers. It was also communicated to another panel of 21

persons/workmen recommended for appointment as

Fieldman. The intimation dated 14-2-99, it was noticed that

6142

THE GAZETTE OF INDIA : OCTOBER 26, 2013/KARTIKA 4, 1935

[PART II—SEC. 3(ii)]

21 persons appointed on adhoc basis. Their order of

appointment was clean. There was no condition of

appointment on adhoc basis. The communication dated

14-2-99 did not find reference of appointment on probation

as mentioned in their order of appointments. That said

communication did not disclosed reasons or ground for

review of their appointments. Error was committed. That all

those 21 persons were appointed after following procedure

following interview for selection.

3. After receiving communication dated 14-2-99, all

those 21 persons submitted several representations, notice

of hungerstrike was given to the authorities but without

any reason. It is claimed that 21 persons have right to be

appointed as Fieldman. They were appointed after following

proper selection process and interview. They were not given

opportunity to put up their defence prior to cancellation of

their appointment as Fieldman. The management has not

given reasons how the earlier selection was wrong. Once

the workman were appointed on post of Fieldman following

proper procedure, they worked satisfactorily. They were

entitled to pay scale for the post of Fieldman. On such

ground, 1st party submits that the reversion of workman

from the post of Fieldman is illegal. All those 21 persons

are entitled to work as Fieldman and consequential benefits

of pay scale.

4. Ilnd party filed Written Statement. at Page 7/1 to

7/9. The claim of 1st party Union is opposed. It is submitted

that MOIL is Government of India Undertaking under

Ministry of Coal. It has introduced rules for Recruitment

and Promotion in 1994 revised w.e.f. 1-8-95. New category

of Fieldman was included as per the recruitment and

promotion rules. 100 % vacancies of Fieldman are to be

filled in through the process of recruitment form amongst

the Piece Rated workers. The internal recruitment is made

on the basis of selection. The details is that regard are not

described in the recruitment rules: The matter was

discussed with recognized Union and bipartite agreement

was finalized. Regarding the marks to be followed in case

of piece rated workers, Seniority= 10 marks, Educational

qualification= 5 marks, performance= 10 marks, attendance

for last 12 months= 15 marks and performance during

interview= 15. marks were to be considered for the selection

of Fieldman. It is submitted that management notified

vacancies of Fieldman at Balaghat Mines. Applications

were invited from piecerated workers. 552 applications were

received, all of them were called for interview, selection

committee was constituted. Selection Committee

recommended 152 candidates for appointment as per the

availability of vacancies, the first 76 candidates were

appointed as fieldman in August 1998.

5. After appointment of those 76 workmen in Balaghat

Mines, complaints were received from employees as well

as recognized Union stating that there have been factual

errors with regard to the data furnished to the Selection

Committee. As a result of that, certain persons really

deserving selection were omitted and certain persons who

were not eligible for selection came to be selected by the

Committee. The recognized Union also served strike notice

on the management on 6-10-98 calling strike for fulfilling

their charter of demands. One of the demand was with

respect to alleged irregularity in selection of Fieldman. After

receiving the strike notice, RLC, Nagpur intervened in the

matter and ceased it in conciliation. The matter was

discussed on 20-5-99 before RLC(C), Nagpur. The

management agreed to issue written communications to all

employee selected and appointed as Fieldman at Balaghat

Mine. The matter was being reviewed about selection and

continuation on the post of Fieldman would be subject to

review. The selection committee was asked review selection

and submit findings. The Committee recommended

selection of only 76 candidates who had been appointed

and the remaining 76 were on the Waiting List.

Subsequently the management also scrapped the remaining

portion of this list.

6. It is further submitted that Selection Committee

reviewed all aspects of the matter, re-considered interview

of all candidates based on corruptive data and submitted

fresh list of candidates for the post of Fieldman. In partial

modification of their earlier recommendations, the new panel

recommended majority of the names from previous list, few

persons from old could not find place in the new list. That

after receiving the recommendations, management decided

to revert Fieldman whose names do not appear in the

greenlist. The employees whose names were recommended

is old and new list were continued on the post of Fieldman.

The management already confirmed their services whose

probation period was found satisfactorily. The Fieldman

whose performance was not found satisfactory during

probation period was extended for six months. The 21

persons whose names were included in the 1st list did not

find their name in the new list of recommendations. Those

post were to be filled from internal recruitment. Out of piece

rated workers, it is reiterated by management that the new

list was submitted by the Conciliation Committee. The

names of those 21 persons were not recommended therefore

they were reverted back to the post of piece rated labour.

All other contentions of workman are denied. IInd party

prays for rejection of the claim of workman.

7. 1st party filed rejoinder at Page 9/1 to 9/2. It is

submitted by workman that according to the bye-laws of

Union, Rashtriya Mazdoor Sangh is operating in the IInd

party. The demand for reference was submitted by the

Republican Mazdoor Sanghan. Such Union is not existing

with IInd party. All other contentions of 1st party union are

reiterated. 1st party submits the record of the persons

concerned with the reference, no variation was found by

the Selection Committee. Mischief was committed by the

Selection Committee at the time of interview. While filing

statement of claim, the Union had already submitted details

¹Hkkx II—[k.M 3(ii)º

Hkkjr dk jkti=k % vDrwcj 26] 2013@dk£rd 4] 1935

6143

of certain persons who have been selected illegally. They

have been wrongly denied promotion. On such grounds,

1st party workman prayed for arrears of their claim.

8. Considering pleadings on record, the points which

arise for my consideration and determination are as under.

My findings are recorded against each of them for the

reasons as below :—

(i)

Whether the demand raised by

Shri Sevakram and 20 others

In Affirmative

against the management of

Manganese Ore ( India) Ltd

vide their representation

dated 17-3-99 (annexure I) is

legal?

(ii) If not, what relief the

Relief prayed by

workman is entitled to?"

Union is rejected.

REASONS

9. Along with letter of reference, Annexure II was

received signed by 21 persons. Annexure I refers to

selection of all those 21 persons by Selection Committee

and appointment orders dated 16-8-98 for the post of

Fieldman. That their appointment order is cancelled, other

21 persons were promoted in their place on recommendation

of the Selection Committee. It is alleged to be matter of

conspiracy. Their promotion right was illegally taken away.

10. Affidavit of evidence of Shri Kanhaiyalal

S/o Udaylal is filed by the 1st party union. He has stated

about his selection by the Committee for the post of

Fieldman. The order was issued for 6 months. He was

reverted to the post of Fieldman. Thereafter the order was

cancelled without giving him opportunity of hearing. The

persons having less educational qualification working as

piecerated employee were selected as Fieldman but details

of such persons are not given in his affidavit of evidence.

Anexure-A is annexed with his affidavit. Name of 21 persons

are shown with remarks about attendance, educational

qualification, seniority but the specific information is not

given about the number of working days, attendance during

the 12 calendar months. In his cross-examination, above

witness says that they have disclosed information in his

affidavit according to his personal knowledge. He was

appointed as piece rated labour. He was member of

Rashtriya Manganese Ore Mazdoor Sangh (INTUC). Such

Union seems to exist 4 years back. That post of Fieldman

was filed by promotion from piece rated worker by Selection

Committee. 76 persons were given order of appointment,

rest were kept in waiting list including those 20 persons

and himself. He claims ignorance about the discussion

before RLC, Nagpur and office bearer of the Union.

Consequently the appointment orders were cancelled. He

says that he had not received any information about the

review of the selection list by Committee. That after

completion of six months of their promotion, the order was

cancelled. As their promotion was not approved, therefore

it was cancelled.

11. Affidavit of evidence is filed by Shri Raju,

S/o Sakroo, Shri Neelkanth S/o Radhelal, Shri Parmanand,

S/o Shri Chandulal, Shri Shersingh S/o Shivlal and

Shri Foolchand S/o Shri Babulal. All the affidavit are

identical to the affidavit of Shri Kanhaiyalal but those

witnesses not made available for cross-examination

therefore their evidence cannot be considered in the matter.

12. Management filed affidavit of evidence of

Shri Nitin Pagnis, Sr. Manager MOIL Hqr. Nagpur. His

affidavit is devoted to the details of the procedure followed

in earlier selection. 10 marks for seniority, 5 marks for

Educational qualification, 10 marks for performance, 15

marks attendance for last 12 months and 15 marks

performance during interview. His affidavit also states that

152 candidates were selected by the Committee, 76 post of

Fieldman were filled. There was waiting list of 76 candidates.

After the appointment, several complaints were received.

Union had given strike notice and selection committee

committed illegalities and selected the candidates for the

post of Fieldman. The names of all 21 workers were not

appearing in the new list therefore they were reverted back

to the post of fieldman. The evidence of management

witness remained unchallenged. He was not cross-examined

by Union. I donot find reason to disbelieve the facts stated

in affidavit. When strike notice was given as per discussion

before RLC, Nagpur, the selection list was reviewed,

interview were held IInd time , 21 persons participated in

the said interview but they were not selected considering

the factors of selection. The grievance of the applicant

cannot be said proper. They participated in the IInd

selection process, they got opportunity for selection IInd

time. Their grievance only after not found selected in the

IInd list is not acceptable. For above reasons, I hold that

demand of 1st party is not legal. Accordingly I record my

finding in Point No. l.

13. In the result, award is passed as under:—

1. The demand for promotion raised by

Shri Sevakram and 20 others against the management of

Manganese Ore ( India) Ltd. vide their representation dated

17-3-99 (Annexure I) is not legal.

2. Relief prayed by Union is rejected.

R. B. PATLE, Presiding Officer

ubZ fnYyh] 24 flrEcj] 2013

dkñvkñ 2311-—vkS|ksfxd fookn vf/kfu;e] 1947 ¼1947

dk 14½ dh /kkjk 17 ds vuqlj.k esa dsUnzh; ljdkj eSllZ eSxuht

vksj bafM;k fyñ] ftyk HkaMkjk ds izca/kra= ds lac) fu;kstdksa vkSj

muds deZdkjksa ds chp vuqca/k esa fufnZ"V vkS|ksfxd fookn esa dsUnzh;

6144

THE GAZETTE OF INDIA : OCTOBER 26, 2013/KARTIKA 4, 1935

[PART II—SEC. 3(ii)]

ljdkj vkS|ksfxd vf/kdj.k ,oa Je U;k;ky;] ukxiqj ds iapkV

¼lanHkZ la[;k 35@2008½ izdkf'kr djrh gS tks dsUnzh; ljdkj dks

23@9@2013 dks izkIr gqvk FkkA

[ lañ ,y&27012@1@2008µvkbZ vkj ¼,e½]

tksgu rksiuks] voj lfpo

New Delhi, the 24th September, 2013

S.O. 2311.—In pursuance of Section 17 of the

Industrial Disputes Act, 1947 (14 of 1947), the Central

Government hereby publishes the award (Ref. No. 35/2008)

of the Central Government Industrial Tribunal/Labour

Court, Nagpur now as shown in the Annexure in the

Industrial Dispute between the employers in relation to the

management of M/s. Magnese Ore (India) Ltd., Distt.

Bhandara and their workman, which was received by the

Central Government on 23.09.2013.

[No. L-27012/1/2008-IR (M)]

JOHAN TOPNO, Under Secy.

ANNEXURE

BEFORE SHRI J.P. CHAND, PRESIDING OFFICER,

CGIT-CUM-LABOUR COURT, NAGPUR

Case No. CGIT/NGP/35/2008

Date: 13.08.2013

Party No. 1

: The Mines Manager,

Manganese Ore (India) Ltd.,

Chikla Mine, Tahsil Tumsar,

Distt. Bhandara.

Party No. 2

: Shri Hanslal Warade

Driver, Chikla Mine, Post:

Chikla, Tahsil-Tumsar,

Distt. Bhandara. (Dead)

Applicants

: (1) Ramdayal S/o. Hanslal Warade

Aged about 21 Years, Occ-Presently Nil,

(2). Smt. Sunita W/o Hanslal Warade

Aged about 42 years, Occ-Household

Both residents of Chikhala Mines,

PO: Chikhala, Tumsar, Distt. Bhandara.

AWARD

(Dated: 13th August, 2013)

In exercise of the powers conferred by clause (d) of

sub-section (1) and sub-section 2(A) of section 10 of

Industrial Disputes Act, 1947 (14 of 1947) ("the Act" in

short), the Central Government has referred the industrial

dispute between the employers, in relation to the

management of MOIL and their workman, Shri Hanslal

Warade, for adjudication, as per letter No. L-27012/1/

2008-IR (M) dated 22.09.2008, with the following

schedule:—

"Whether the action of the management of the

Manganese Ore (I) Ltd., Chikla Mine in dismissing

Shri Hanslal Sumratlal Warade, an Ex-workman of

Chikla Mine from service is legal and justified? If

not, to what relief is the workman is entitled?''

2. On receipt of the reference, parties were noticed to

file their respective statement of claim and written statement,

in response to which, the applicants, who are the legal

heirs of the deceased workman, Shri Hanslal Warade, (''the

applicants'' in short) filed the statement of claim and the

management of MOIL, ("party no. 1" in short) filed the

written statement.

The case of the applicants (the legal heirs of the

deceased workman, Hanslal Sumratlal Warade) is that

deceased workman was in the employment of party no. 1 at

Chikhla Mines as a driver w.e.f. 12.04.1975 and a charge

sheet dated 11.05.2006 was issued by the party no. 1

levelling various false charges against him and the

deceased workman submitted his reply to the said charge

sheet, but party no. 1 was not satisfied with his reply and

initiated the departmental proceedings against him and after

conducting the departmental enquiry, the deceased

workman was dismissed from services w.e.f. 14.01.2007 and

the deceased workman raised the Industrial dispute before

the Asstt. Labour Commissioner (C), Nagpur and due to

failure of the conciliation, failure report was submitted to

the Central Government and the Central Government in its

turn referred the dispute to the Tribunal for adjudication,

but before filing of the statement of claim by the deceased

workman challenging his illegal dismissal from service

dated 14.01.2007, he died on 19.01.2009 and as such, the

statement of claim has been filed by them, as the wife and

son of the deceased workman. The further case of the

applicants is that charge sheet dated 11.05.2006 was

submitted against the deceased workman for commission

of the alleged theft of steel plate carried by him in the

explosive van and when the security guard at the gate

asked him about the said steel plate, he replied to have

been carrying the same to the workshop for welding and

he did not bring back the steel plate and handed over the

explosive van to one Shri Omprakash Devisingh, Driver at

about 12 PM and such action of the deceased workman

amounted to misconduct under clauses 29 (b) (3) (9) (10) of

the certified standing order of party No. 1 and the deceased

workman in his reply, denied the charges levelled against

him and infact, the deceased workman did not take any

steel plate to outside the plant to the workshop and

according to the procedure, in case of taking anything

outside of the plant, it is necessary to prepare a gate pass

¹Hkkx II—[k.M 3(ii)º

Hkkjr dk jkti=k % vDrwcj 26] 2013@dk£rd 4] 1935

6145

for the same and without the gate pass, nothing can be

taken out of the plant and the security guard uses to check

the vehicles and without gate pass, he does not allow

anything to be taken out of the security gate and it is clear

that no gate pass was prepared for the steel plate and as

such, it could not have been taken out from the main gate.

It is further pleaded by the applicants that, not admitting,

but assuming that the deceased workman might have taken

the steel plate, then at the first place, the Party No. 1 should

have lodged a report at the police station and secondly,

the steel plate should have been recovered from the

possession of the deceased workman, but neither any police

complaint was against the deceased workman not there

was recovery of the steel plate from his possession and

such facts clearly indicate that no steel plate was stolen by

the deceased workman and false charges were levelled

against him and therefore, the issuance of the charge sheet

against the workman was with malafide intention and to

implicate him for the false charge of theft and the deceased

workman in his reply had categorically mentioned that the

officers of Party No. 1 were compelling him to carry their

house hold articles in the explosive van and whenever, he

was objecting or denying to carry the materials, he was

being threatedned of termination of his services by the

said officers.

The further case of the applicants is that the

departmental enquiry was conducted by the enquiry officer

in a very strange manner and the copy of the enquiry

proceedings was not supplied to the workman during the

course of the enquiry and such fact was brought to the

notice of the diciplinary authority and non-supply of the

copy of the proeedings was in violation of the principles of

natural justice and the enquiry officer acted as a prosecutor

and he himself asked questions to the deceased workman

and deceased workman was not given proper opportunity

to defend his case and the enquiry officer without explaining

the procedure of the enquiry, conducted the enquiry as per

his whims and the enquiry officer was biased and his

findings were perverse and the enquiry officer held the

charges to have been proved without any justification and

basing on such perverse and baseless findings, the

workman was dismissed from services and as such, the

order of dismissal is liable to be set aside, the same being

illegal and contrary to the provisions of laws.

The further case of the applicants is that the charge

sheet was issued by the Manager of Chikla Mines under

his signature and the dismissal order was also singned by

him as the Disciplinary Authority and below the signature

of the Manager, the Deputy General Manager also signed

the dismissal order and in the dismissal order dated

14.01.2007, it was mentioned that the said authority will

decide the appeal preferred by the deceased workman and

the Party No. 1 in colorable exercise of power acted as

dictator to victimize the workman and the entire procedure

adopted by Party No. 1 was illegal and the dismissal order

was not served on the deceased workman and the

Sr. Personnel Manager, Shri Pagnis and the then C.M.O.,

Shri Kishanlal Mehrotra with hand in gloves put the false

signature of the deceased workman and submitted the same

before the ALC (C), Nagpur in conciliation proceeding and

the deceased workman had challenged the same and though

the deceased workman had preferred an appeal to the

appellate authority, in reply to the same, the appellate

authority raised new allegation of selling liquor by him in

the residential quarter allotted to him by the company,

which allegation was not included in the charge sheet and

the said fact clearly indicates that the Party No. 1 was bent

upon to dismiss the services of the deceased workman.

The applicant have prayed to answer the reference

in their favour and to give them monetary benefits from the

date of the illegal dismissal of the deceased workman till

his death and consequential benefits and to give

compassionate appointment to applicant No. 1.

3. The Party No. 1 in their written statement have

pleaded inter-alia that the service record of the deceased

workman was not clean and excellent and the workman had

been charge sheeted earlier, for the misconduct of theft of

diesel and punishment of suspension of four days with

loss of wages under the certified standing order of the

company had been imposed against him, after conducting

of departmental enquiry and the deceased workman on

29.04.2006 at about 2. P.M. took one old jaw plate from the

crushing plant in the explosive van, which he was driving,

with an intention of welding of the plate in the workshop,

without any instruction from any of the competent

authorities and the plate was taken by the workman to

outside of Chikla Mine instead of to the workshop and his

such action amounted to misconduct under the certified

standing order, so he was charge sheeted under clause 29

B (iii) (ix) (x) of the Standing Order on 11.05.2006 and as the

reply submitted by the deceased workman on 22.05.2006

was found to be unsatisfactory, it was decided by the

Disciplinary Authority, the Mines Manager, Chikla Mine

to conduct the departmental enquiry and the disciplinary

authority appointed Shri S.K. Biswas as the enquiry officer

on 15/06/2006, to conduct the departmental enquiry and

the enquiry officer conducted the enquiry as per the

procedure laid down in the certified standing order, by

offering proper opportunity of hearing to the deceased

workman and by following the principles of natural justice

and the deceased workman participated in the enquiry and

he denied the suggestion of the enquiry officer to take

assistance of any co-worker or office bearer of a registered

union, stating to conduct his own case himself and he

cross-examined the three witnesses produced by them and

the deceased workman did not produce any witness and

gave his statement only and after completion of the enquiry,

the enquiry officer submitted the enquiry report holding

the charges to have been proved against the deceased

workman and the disciplinary authority issued the second

6146

THE GAZETTE OF INDIA : OCTOBER 26, 2013/KARTIKA 4, 1935

[PART II—SEC. 3(ii)]

show cause notice alongwith the copy of the enquiry report

to the deceased workman, vide letter dated 24.12.2006, in

respect of the proposed punishment and the deceased

workman submitted his reply to the 2nd show cause notice

on 01.01.2007 and as the reply was found to be not

satisfactory, the disciplinary authority decided to impose

the punishment of dismissal from services and accordingly

vide order dated 14.01.2007, the workman was dismissed

from services with immediate effect. The further case of

Party No. 1 is that no gate pass is necessary for movement/

transportation of material within the mine area and such

gate pass is required only when any material is taken out

from the mines area and the deceased workman took the

plate from the crushing plant without any official instruction

from any authority and instead of taking the same to the

Mechanical workshop, he took the same outside the mines

area for the purpose of theft and the misconduct of theft

was proved against the deceased workman and the

allegations of threat given by officials to terminate the

services of the deceased workman are unfounded and after

thought and copy of the enquiry proceedings was handed

over to the workman and the same was duly acknowledged

by him and the workman did not produce any witness in

the enquiry even thought opportunity was given to him

for the same and the enquiry officer did not conduct the

enquiry as per his whims and in a biased manner and such

allegations are false and the Mines Manager, Chikla Mine

being the disciplinary authority under the certified standing

order had rightly issued the charge sheet and signed the

order of dismissal and the Agent and Deputy General

Manager, Group of the Mine is an appellate authority and

the allegations made in this regard are not true and the

dismissal order was duly served on the deceased workman

and the appeal preferred by him on 12.02.2007 against the

penalty of dismissal before the Agent and DGM, Group of

Mines came to be rejected by a reasoned order. The further

case of the Party No. 1 is that mere non-filing of the police

complaint does not lead to the conclusion that the deceased

workman was falsely implicated and the statment of claim

does not point out any material to show perversity of

findings and the appellate authority in the order did not

raise any new allegation of selling liquor as pointed out,

but it was in respect of the past conduct of the deceased

workman, which was taken account of by the appellate

authority and there is no illegality in dismissing the

workman from services, as the charges of theft levelled

against him were proved in the departmental enquiry and

they lost faith in the deceased workman and the applicants

are not entitled to any relief.

4. In the rejoinder, the facts mentioned in the

statement of claim are reiterated.

5. It is necessary to mention here that as this is a

case of dismissal of the deceased workman from services

after holding of a departmental enquiry, the legality or

otherwise of the departmental enquiry was taken up for

consideration as a preliminary issue and by order dated

01.02.2013, the departmental enquiry conducted against

the deceased workman was held to be legal, proper and in

accordance with the principles of natural justice.

6. At the time of argument, it was submitted by the

learned advocate for the applicants that false charge of

theft of a steel plate had been levelled against the workman

and the evidence adduced in the departmental enquiry was

inconsistent, untrustworthy and discrepant and the same

was insufficient to hold the workman guilty of the charge

and as such, the findings of the Enquiry Officer were totally

perverse and the punishment of dismissal imposed against

the workman was highly disproportionate and illegal and

as such the workman was entitled to be reinstated in service

and as the workman died on 19.01.2009, the applicants,

who are his legal heirs are entitled for monetary benefits

with all consequential benefits till the date of death of the

workman.

7. Per contra, it was submitted by the learned advocate

for the Party No.1 that by order dated 01.02.2013, the

departmental enquiry held against the deceased workman

has already been held to be legal, proper and in accordance

with the principles of natural justice and for commission of

misconduct of theft of an old jaw plate from the CS plant

charge sheet under the certified standing order was

submitted against the workman and the report of the enquiry

officer was based on the evidence adduced in the enquiry

and was not based on any extraneous materials and as

such, the findings cannot be said to be perverse and the

disciplinary authority while imposing the punishment had

taken the past service records of the deceased workman

and the punishment imposed against the workman was

justified and the same was legal and proper and the same

cannot be said to be shockingly disproportionate to the

grave misconduct committed by the workman and the

reference is to be answered in favour of Party No. 1.

8. It is to be mentioned here that most of the

submissions made by the learned advocate for the workman

have already been considered at of deciding of the

preliminary issue of the validity of the departmental enquiry,

so there is no question of consideration of such

submissions again.

9. At this juncture, I think it apropos to mention the

principles settled by the Hon'ble Apex court in a string of

decisions regarding the jurisdiction and power of the

Tribunal in regard to interference with the findings and

punishment in a departmental enquiry.

It is well settled by the Hon'ble Apex Court that:-

"The jurisdiction of the Tribunal to interfere with the

disciplinary matters or punishment cannot be equated with

an appellate jurisdiction. The Tribunal cannot interfere with

the findings of the enquiry officer or competent authority

where they are not arbitrary or utterly perverse. The power

to impose penalty on a delinquent officer is conferred on

the competent authority either by an Act of legislature or

rules made under the proviso to Art. 309 of the Constitution.

If there has been an enquiry consistent with the rules and

¹Hkkx II—[k.M 3(ii)º

Hkkjr dk jkti=k % vDrwcj 26] 2013@dk£rd 4] 1935

6147

in accordance with principles of natural justice what

punishment would meet the ends of justice is a matter

exclusively within the jurisdiction of the competent

authority. If the penalty can lawfully be imposed and is

imposed on the proved misconduct, the Tribunal has no

power to substitute its own discretion for that of the

authority. The adequacy of penalty unless it is mala fide is

certainly not a matter for the Tribunal to concern itself

with. The Tribunal also cannot interfere with the penalty if

the conclusion of the enquiry officer or the competent

authority is based on evidence even if some of it is found

to be irrelevant or extraneous to the matter."

It is also settled by the Hon'ble Apex Court that:-

"A review of the above legal position would establish

that the disciplinary authority and on appeal, the appellate

authority, being fact finding authorities have exclusive

power to consider the evidence with a view to maintain

discipline. They are invested with the discretion to impose

appropriate punishment keeping in view the magnitude or

gravity of the misconduct. The High Court/Tribunal, while

exercising the power of judicial review, cannot normally

substitute its own conclusion on penalty and impose some

other penalty. If the punishment imposed by the disciplinary

authority or the appellate authority shocks the' conscience

of the High Court/Tribunal, it would appropriately mould

the relief, either directing the disciplinary/appellate

authority to reconsider the penalty imposed, or to shorten

the litigation, it may itself, in exceptional and rare cases,

impose appropriate punishment with cogent reasons in

support thereof."

It is also well settled by Hon'ble Apex Court that:-

In departmental proceedings, the disciplinary

authority is the sole judge of facts and in case an appeal is

presented to the appellate authority, the appellate authority

has also the power/and jurisdiction to re-appreciate the

evidence and come to its own conclusion, on facts, being

the sole fact-finding authorities. Once findings of fact,

based on appreciation of evidence are recorded, the High

Court in writ jurisdiction may not normally interfere with

those factual findings unless it finds that the recorded

findings were based either on no evidence or that the

findings were wholly perverse and/or legally untenable.

The adequacy or inadequacy of the evidence is not

permitted to be canvassed before the High Court. Since

the High Court does not sit as an appellate authority over

the factual findings recorded during departmental

proceedings, while exercising the power of judicial review,

the High Court cannot, normally speaking, substitute its

own conclusion, with regard to the guilt of the delinquent,

for that of the departmental authorities. Even insofar as

imposition of penalty or punishment is concerned, unless

the punishment or penalty imposed by the disciplinary or

the departmental appellate authority, is either impermissible

or such that it shocks the conscience of the High Court, it

should not normally substitute its own opinion and impose

some other punishment or penalty. Both the learned Single

Judge and the Division Bench of the High Court, it appears,

ignored the well-settled principle that even though judicial

review of administrative action must remain flexible and its

dimension not closed, yet the Court, in exercise of the

power of judicial review, is not concerned with the

correctness of the findings of fact on the basis of which

the orders are made so long as those findings are

reasonably supported by evidence and have been arrived

at through proceedings which cannot be faulted with for

procedural illegalities or irregularities which vitiate the

process by which the decision was arrived at. Judicial

review, it must be remembered, is directed not against the

decision, but is confined to the examination of the decision-

making process."

10. Keeping in view the above settled principles, now,

the case in hand is to be considered.

After perusing the materials on record including the

papers of the departmental enquiry and taking into

consideration the submissions made by the learned

advocates for the parties, it is found that the enquiry officer

has arrived at the conclusions by analyzing the evidence

adduced in the departmental proceeding systematically and

so also in a rational manner. The findings of the enquiry

officer are based on the materials on record of the enquiry

proceedings and not on any extraneous consideration. It

is also found that this is not a case of no evidence or that

the findings of the enquiry officer are based on no evidence.

The findings of the enquiry officer are not as such, which

could not have been reached by a prudent man on the

materials available on record. Hence, the findings of the

enquiry officer cannot be said to be perverse.

11. So far the proportionality of the punishment is

concerned; in this case, grave misconduct of theft has

been proved against the workman in a properly conducted

departmental enquiry. As the punishment imposed against

the workman is not shockingly disproportionate to the

grave misconducts proved against him in a properly

conducted departmental enquiry, there is no scope to

interfere with the same. Hence, it is ordered:-

ORDER

The action of the management of the Manganese

Ore (I) Ltd., Chikla Mine in dismissing Shri Hanslal Sumratlal

Warade, an Ex- workman of Chikla Mine from service is

legal and justified. As the workman was not entitled to any

relief, the applicants, who are his legal heirs are not entitled

to any relief.

J.P. CHAND, Presiding Officer

Printed by the Manager, Government of India Press, Ring Road, Mayapuri, New Delhi-110064

and Published by the Controller of Publications, Delhi-110054.