dkfeZd] yksd f'kdk;r rFkk isa'ku ea=ky;

¼dkfeZd vkSj izf'k{k.k foHkkx½

ubZ fnYyh] 1 vDrwcj] 2015

dk-vk- 1923-—dsUnz ljdkj ,rn~}kjk naM izfØ;k lafgrk] 1973

¼1974 dk 2½ dh /kkjk 24 dh mi/kkjk ¼8½ }kjk iznÙk 'kfDr;ksa dk

iz;ksx djrs gq, O;kie }kjk lapkfyr fofHkUu ijh{kkvksa esa Hkz"Vkpkj

fuokj.k vf/kfu;e] 1988 ¼1988 dk 49½ dh /kkjk 3 ds v/khu

fd, x, vijk/kksa dh fnYyh fo'ks"k iqfyl LFkkiuk vf/kfu;e] 1946

¼1946 dk 25½ ds varxZr dsUnzh; vUos"k.k C;wjks }kjk dh tk jgh

tkap rFkk e/; izns'k ljdkj dh vf/klwpuk lañ ,Qñ,uñ

1@5@96@XX&ch ¼,d½@2220@2015 fnukad 28 tqykbZ] 2015 }kjk

vf/klwfpr fopkj.k U;k;ky;ksa esa vfHk;kstu dk lapkyu djus rFkk

mu ekeyksa ls mRiUu izklafxd vU; ekeyksa esa vihy@iqujh{k.k gsrq

fuEufyf[kr vf/koDrkvksa dks fo'ks"k yksd vfHk;kstdksa ds :i esa

fu;qDr djrh gS; uker% %—

¼1½ Jh lrh'k fnudj

¼2½ Jh uFkh ey N=hoky

¼3½ Jh jatu 'kekZ

¼4½ Jh ,lñ,lñ,pñ fjtoh

¼5½ Jh eqds'k dqekj feJk

¼6½ Jh iou dqekj ikBd

¼7½ Jh jek 'kadj frokjh

[Qkñ lañ 225@19@2015&,ohMh&II]

vthr dqekj] voj lfpo

MINISTRY OF PERSONNEL, PUBLIC GRIEVANCES

AND PENSIONS

(Department of Personnel and Training)

New Delhi, the 1st October, 2015

S.O. 1923.—In exercise of the powers conferred by

sub-section (8) of section 24 of the Code of Criminal

Procedure, 1973 (2 of 1974), the Central Government hereby

appoints the following Advocates as Special Public

Prosecutors for conducting prosecution in the Trial Courts,

notified by the Government of Madhya Pradesh vide

Notification No. F.N. 1/5/96/XX-B(one)/2220/2015, dated

28th July, 2015, to try the cases relating to the offences

specified under section 3 of the Prevention of Corruption

Act, 1988 (49 of 1988) in relation to various examinations,

jftLVªh la- Mh- ,y- (,u) 04@0007@2003µ05

REGD. NO. D. L. (N) 04/0007/2003—05

izkf/dkj ls izdkf'kr

PUBLISHED BY AUTHORITY

lkIrkfgd

WEEKLY

la- 41 ]

ubZ fnYyh] vDrwcj 4—vDrwcj 10] 2015] 'kfuokj@vkf'ou 12—vkf'ou 18] 1937

No. 41 ]

NEW DELHI, OCTOBER 4—OCTOBER 10, 2015, SATURDAY/ASVINA 12—ASVINA 18, 1937

bl Hkkx esa fHkUu i`"B la[;k nh tkrh gS ftlls fd ;g i`Fkd ladyu ds :i esa j[kk tk lds

Separate Paging is given to this Part in order that it may be filed as a separate compilation

Hkkx II—[k.M 3—mi&[k.M (ii)

PART II—Section 3—Sub-section (ii)

Hkkjr ljdkj ds ea=kky;ksa (j{kk ea=kky; dks NksM+dj) }kjk tkjh fd, x, lkafof/d vkns'k vkSj vf/lwpuk,a

Statutory Orders and Notifications Issued by the Ministries of the Government of India

(Other than the Ministry of Defence)

4102 GI/2015

(3991)

3992

THE GAZETTE OF INDIA : OCTOBER 10, 2015/ASVINA 18, 1937

[PART II—SEC. 3(ii)]

conducted by Vyapam and investigated under the Delhi

Special Police Establishment Act, 1946 (25 of 1946) by the

Central Bureau of Investigation and appeals or revisions

or other matters connected therewith or incidental thereto

namely:—

1.

Shri Satish Dinkar

2.

Shri Nathi Mal Chhatriwal

3.

Shri Ranjan Sharma

4.

Shri S.S.H. Rizavi

5.

Shri Mukesh Kumar Mishra

6.

Shri Pawan Kumar Pathak

7.

Shri Rama Shankar Tiwari

[F.No. 225/19/2015-AVD-II]

AJIT KUMAR, Under Secy.

foÙk ea=ky;

¼foÙkh; lsok,a foHkkx½

'kqf)&i=

ubZ fnYyh] 7 vDrwcj] 2015

dk-vk- 1924-—21 vxLr] 2015 dh vf/klwpuk la[;k

20@2@2012&vkbZ,Q&II dks fuEukuqlkj i<+s tkus ds fy, la'kksf/kr

fd;k tkrk gS%

^^#X.k vkS|ksfxd daiuh ¼fo'ks"k mica/k½ vf/kfu;e] 1985 dh

/kkjk 6 dh mi&/kkjk ¼5½ }kjk iznÙk 'kfDr;ksa dk iz;ksx djrs gq,]

dsUnzh; ljdkj] ,rn~}kjk] U;k;ewfrZ egkjkt flUgk] v/;{k] vkS|ksfxd

vkSj foÙkh; iqufuekZ.k vihyh; izkf/kdj.k ¼,,vkbZ,Qvkj½ ds

dk;Zdky ds fnukad 15-08-2015 dks iwjk gksus ds ifj.kkeLo:i]

Jh vkjñ lhñ feJk dks vkS|ksfxd vkSj foÙkh; iqufuekZ.k vihyh;

izkf/kdj.k ¼,,vkbZ,Qvkj½ ds ofj"Bre lnL; gksus ds dkj.k mUgsa

inHkkj xzg.k djus dh rkjh[k ls ,,vkbZ,Qvkj ds lekiu rd ;k

vxys vkns'kksa rd] tks Hkh igys gks] vkS|ksfxd vkSj foÙkh; iqufuekZ.k

vihyh; izkf/kdj.k esa v/;{k ds :i esa dk;Z djus ds fy, izkf/kd`r

djrh gSA**

[Qkñ lañ 20¼02½@2002&vkbZ,Q&II ¼[kaM&III½]

,eñ ,eñ nkSyk] voj lfpo

MINISTRY OF FINANCE

(Department of Financial Services)

CORRIGENDUM

New Delhi, the 7th October, 2015

S.O. 1924.—The Notification No. 20/2/2012-IF-II dated

21st August, 2015 is amended to read as under:

"Consequent upon completion of tenure of

Justice Maharaj Sinha, Chairman, Appellate Authority

for Industrial and Financial Reconstruction (AAIFR)

on 15.08.2015, the Central Government, in exercise of

the powers conferred by sub-section (5) of Section 6

of the Sick Industrial Companies (Special Provisions)

Act, 1985, hereby authorise Shri R.C. Mishra, being

the senior most Member in AAIFR, to act as

Chairman, AAIFR with effect from the date of

assumption of the charge of the post till abolition of

AAIFR or until further orders, whichever the event

takes place earlier".

[F.No. 20(02)/2002-IF-II (Vol. III)]

M. M. DAWLA, Under Secy.

miHkksDrk ekeys] [kk| vkSj lkoZtfud forj.k ea=ky;

¼miHkksDrk ekeys foHkkx½

¼Hkkjrh; ekud C;wjks½

ubZ fnYyh] 1 vDrwcj] 2015

dk-vk- 1925-—Hkkjrh; ekud C;wjks ¼izek.ku½ fofu;e 1988 ds fofu;e 4 ds mifu;e ¼5½ ds vuqlj.k esa Hkkjrh; ekud C;wjks ,rn~}kjk

vf/klwfpr djrk gS fd ftu ykblsalksa ds fooj.k uhps vuqlwph esa fn, x, g®] os Lohd`r dj fn, x, g®%&

vuqlwph

Øñ

ykblsal lañ

Lohd`r djus dh

ykblsal/kkjh dk uke o irk

Hkkjrh; ekud dk 'kh"kZ

Hkkñekñ la ¼Hkkx@

lañ

frfFk o"kZ@ekg

vuqHkkx½ o"kZ

1-

6500007198

20150803

eSllZ izse bathfu;fjax

xgjs dqvksa ds fy,

IS 14220 % 1994

,lñ ,Qñ lañ 630@2]

fuEetuh; iEilsV

dLrwjh uk;du iky;e]

oMoYyh iksLV] dks;EcÙkwj & 641 041

2-

6500007299

20150805

eSllZ tkW; vkyqDdkl bafM;k

Lo.kZ ,oa Lo.kZ feJ /kkrq,a]

IS 1417 % 1999

izkbZosV fyfeVsM]

vkHkw"k.k@f'kYidkjh&'kq)rk

229@230] dqeju jksM]

,oa eqgjkadu

Vkmu gkWy ds lkeus] fr#Iiqj & 641 601

[Hkkx II—[k.M 3(ii)]

Hkkjr dk jkti= % vDrwcj 10] 2015@vkf'ou 18] 1937

3993

3-

6500007404

20150806

eSllZ lks;y baMLVªhl

lkQ] BaMs ikuh ds fy,

IS 8472 % 1998

,l ,l lañ 319] Jh jkeuxj

vidsUnzh; iqu#Riknd iEi

,DLVsU'ku] ,Q lh vkbZ jksM]

ihyesMq] dks;EcÙkwj & 641 004

4-

6500007505

20150806

eSllZ lks;y baMLVªhl

xgjs dqvksa ds fy,

IS 14220 % 1994

,l ,Q lañ 319]

fuEetuh; iEilsV

Jh jkeuxj ,DLVsa'ku]

,Q lh vkbZ jksM]

ihyesMq] dks;EcÙkwj & 641 004

5-

6500007606

20150812

eSllZ lhlu ,Dok

iSdstcan is; ty

IS 14543 % 2004

njoktk lañ 570&A] vfoukf'k jksM]

¼iSdstcan feujy ty

ihñ ,uñ iky;e]

ds vykok½

dks;EcÙkwj & 641 037

6-

6500007707

20150819

eSllZ tkW; vkyqDdkl bafM;k

Lo.kZ ,oa Lo.kZ feJ/kkrq,a]

IS 1417 % 1999

izkbZosV fyfeVsM]

vkHkw"k.k@f'kYidkjh&'kq)rk

229@230] dqeju jksM]

,oa eqgjkadu

VkmugkWy ds lkeus]

fr#Iiqj & 641 601

7-

6500007808

20150819

eSllZ baVj xksYM tsEl izkbZosV fyfeVsM

Lo.kZ ,oa Lo.kZ feJ/kkrq,a]

IS 1417 % 1999

vkgwtk VkWoj

vkHkw"k.k@f'kYidkjh&'kq)rk

42] Vhñ ohñ Lokeh jksM ¼if'pe½]

,oa eqgjkadu

vkjñ ,lñ iqje]

dks;Ecrwj & 641 002

[lañ lh,eMh@13%11]

,eñ lnkf'koe] oSKkfud ^,Q* ,oa izeq[k

MINISTRY OF CONSUMER AFFAIRS, FOOD AND PUBLIC DISTRIBUTION

(Department of Consumer Affairs)

(BUREAU OF INDIAN STANDARDS)

New Delhi, the 1st October, 2015

S.O. 1925.—In pursuance of sub-regulation (5) of the regulation 4 of the Bureau of Indian Standards (Certification)

Regulation 1988, of the Bureau of Indian Standards, hereby notifies the grant of licence particulars of which are given in the

following schedule:

SCHEDULE

Sl.

Licence

Grant

Name and Address (Factory) of

Title of the Standard

IS No. Part/

No.

No.

Date

the Party

Sec. Year

1.

6500007198

20150803

M/s. Prem Engineering

Openwell Submersible

IS 14220 : 1994

SF No. 630/2, Kasturi

Pumpsets

Naicken Palayam,

Vadavalli Post,

Coimbatore - 641 041

Øñ

ykblsal lañ

Lohd`r djus dh

ykblsal/kkjh dk uke o irk

Hkkjrh; ekud dk 'kh"kZ

Hkkñekñ la ¼Hkkx@

lañ

frfFk o"kZ@ekg

vuqHkkx½ o"kZ

3994

THE GAZETTE OF INDIA : OCTOBER 10, 2015/ASVINA 18, 1937

[PART II—SEC. 3(ii)]

2.

6500007299

20150805

M/s. Joy Alukkas India

Gold and Gold Alloys,

IS 1417 : 1999

Private Limited

Jewellery/Artefacts -

229/230, Kumaran Road,

Fineness and Marking

Opp. Townhall,

Tiruppur - 641 601

3.

6500007404

20150806

M/s. Soyal Industries

Centrifugal Regenerative IS 8472 : 1998

SF No. 319, Sri Ramnagar

Pumps for clear, Cold

Extension,

Water

FCI Road, Peelamedu,

Coimbatore - 641 004

4.

6500007505

20150806

M/s. Soyal Industries

Openwell Submersible

IS 14220 : 1994

SF No. 319, Sri Ramnagar

Pumpsets

Extension,

FCI Road, Peelamedu,

Coimbatore - 641 004

5.

6500007606

20150812

M/s. Season Aqua

Packaged Drinking Water IS 14543 : 2004

D No. 570-A, Avinashi Road,

(other than Packaged

P.N. Palayam,

Natural Mineral Water)

Coimbatore - 641 037

6.

6500007707

20150819

M/s. Joyalukkas India

Gold and Gold Alloys,

IS 1417 : 1999

Private Limited

Jewellery/Artefacts -

229/230, Kumaran Road,

Fineness and Marking

Opp. Townhall,

Tiruppur - 641 601

7.

6500007808

20150819

M/s. Inter Gold Gems Pvt. Ltd.

Gold and Gold Alloys,

IS 1417 : 1999

Ahuja Tower,

Jewellery/Artefacts -

42, T.V. Swamy Road(W),

Fineness and Marking

R.S. Puram,

Coimbatore - 641 002

[No. CMD/13:11]

M. SADASIVAM, Scientist 'F' & Head

ubZ fnYyh] 1 vDrwcj] 2015

dk-vk- 1926-—Hkkjrh; ekud C;wjks ¼izek.ku½ fofu;e 1988 ds fofu;eu 5 ds mifofu;eu ¼6½ ds vuqlj.k esa Hkkjrh; ekud C;wjks

,rn~}kjk vfèlwfpr djrk gS fd fuEu fooj.k okys ykblsalksa dks muds vkxs n'kkZbZ xbZ rkjh[k ls jí@LFkfxr dj fn;k x;k gS%&

vuqlwph

Øñ

ykblsal lañ

ykblsalèkjh dk uke o irk

LFkfxr fd, x,@jí fd, x, ykblsal ds varxZr

jí gksus dh

lañ

lh ,e@,yñ

oLrq@izØe lEc) Hkkjrh; ekud dk 'kh"kZd

frfFk

1-

6500004697 eSllZ jsbuVªh chojstl

iSdstcan is; ty ¼iSdstcan feujy ty ds vykok½

07@08@2015

la 6@154&D] dqIiqphiky;e]

IS 14543% 2004

vYyykiq#e jksM] dkjSiqnqj xk¡o]

ohjkikUMh iksLV] fr#Iiqj&641 605

[lañ lh ,e Mh@13%13]

,eñ lnkf'koe] oSKkfud ^,Q* ,oa izeq[k

Sl.

Licence

Grant

Name and Address (Factory) of

Title of the Standard

IS No. Part/

No.

No.

Date

the Party

Sec. Year

[Hkkx II—[k.M 3(ii)]

Hkkjr dk jkti= % vDrwcj 10] 2015@vkf'ou 18] 1937

3995

New Delhi, the 1st October, 2015

S.O. 1926.—In pursuance of sub-regulation (6) of the regulation 5 of the Bureau of Indian Standards (Certification)

Regulations 1988, of the Bureau of Indian Standards, hereby notifies that the licence particulars of which are given below

have been cancelled/suspended with effect from the date indicated against each:—

SCHEDULE

Sl.

Licence No.

Name & Address of the Licensee

Article/Process with relevant

Date of

No.

CM/L-

Indian Standard covered by the

Cancellation

licence cancelled/suspension

1.

6500004697

M/s. Raintree Beverages

Packaged Drinking Water (other

07/08/2015

No. 6/154-D, Kuppuchipalayam,

than Packaged Natural Mineral

Allalapuram Road, Karaipudur Village,

Water)

Veerapandi Post,

IS 14543: 2004

Tirupur-641 605

[No. CMD/13:13]

M. SADASIVAM, Scientist 'F' & Head

fof/k vkSj U;k; ea=ky;

¼fof/k dk;Z foHkkx½

ubZ fnYyh] 1 vDrwcj] 2015

dk-vk- 1927-—dsanzh; ljdkj] jktHkk"kk ¼la?k ds 'kkldh;

iz;kstuksa ds fy, iz;ksx½ fu;e] 1976 ¼;Fkk la'kksfèr 1987½ ds

fu;e 10 ds mifu;e ¼4½ ds vuqlj.k esa] fofè vkSj U;k; ea=ky;]

fofè dk;Z foHkkx ds iz'kklfud fu;a=.k ds vèhu fuEufyf[kr

dk;kZy; dks] ftlds 80% ls vfèd deZpkjho`an us fganh dk

dk;Zlkèd Kku izkIr dj fy;k gS] vfèlwfpr djrh gS%&

1- vk;dj vihyh; vfèdj.k] iq.ks U;k;ihB] iq.ks

[Qkñ lañ bZ&11011¼3½@2015&jkñHkkñ¼foñdkñ½]

Vhñ ,uñ frokjh] vij lfpo

MINISTRY OF LAW AND JUSTICE

(Department of Legal Affairs)

New Delhi, the 1st October, 2015

S.O. 1927.—In pursuance of Sub-Rule (4) of Rule 10 of

the Official Languages (Use for Official Purposes of the

Union) Rules, 1976 (as amended in 1987), the Central

Government hereby notifies the following Office under the

administrative control of the Department of Legal Affairs,

Ministry of Law and Justice, where more than 80% staff

have acquired the working Knowledge of Hindi:

1. Income Tax appellate Tribunal, Pune Bench, Pune.

[F. No. E-11011(3)/2015-O.L.(L.A.)]

T. N. TIWARI, Addl. Secy.

lapkj vkSj lwpuk izkS|ksfxdh ea=ky;

¼bysDVªkWfudh vkSj lwpuk izkS|ksfxdh foHkkx½

ubZ fnYyh] 30 flrEcj] 2015

dk-vk- 1928-—dsaæ ljdkj] ,rn~}kjk jktHkk"kk ¼la?k ds 'kkldh;

iz;kstuksa ds fy, iz;ksx½ fu;e] 1976 ds fu;e 10 ds mi fu;e ¼4½

ds vuqlj.k esa] bysDVªkWfudh vkSj lwpuk izkS|ksfxdh foHkkx ds varxZr

vkus okyh jk"Vªh; bysDVªkWfudh ,oa lwpuk izkS|ksfxdh laLFkku ¼ukbfyV½

uked Lok;Rr laLFkk ds lh&134] iqudkWe Hkou] vkS|ksfxd {ks=]

Qst+&VIII] lsDVj&72] ,lñ,ñ,lñuxj] eksgkyh fLFkr dk;kZy;] ftlds

80% ls vfèd deZpkfj;ksa us fgUnh dk dk;Zlkèd Kku izkIr dj

fy;k gS] dks vfèlwfpr djrh gSA

[lañ 7¼2½@2005&fgñvñ]

jktho dqekj] la;qDr lfpo

MINISTRY OF COMMUNICATION AND

INFORMATION TECHNOLOGY

(Department of Electronics & Information Technology)

New Delhi, the 30th September, 2015

S.O. 1928.—In pursuance of Sub-Rule (4) of Rule 10 of

the Official Languages (Use for Official Purposes of the

Union) Rules, 1976, the Central Government hereby notifies

the National Institute of Electronics and Information

Technology (NIELIT) centre, an autonomous society of

the Department of Electronics & Information Technology,

located at C-134, PUNCOM Building Industrial Area, Phase-

VIII, Sector-72, S.A.S. Nagar, Mohali, whereof more than

80% staff have acquired the working Knowledge of Hindi:

[No.7 (2)/2005-H.S.]

RAJIV KUMAR, Jt.Secy.

ubZ fnYyh] 30 flrEcj] 2015

dk-vk- 1929-—dsaæ ljdkj] ,rn~}kjk jktHkk"kk ¼la?k ds 'kkldh;

iz;kstuksa ds fy, iz;ksx½ fu;e] 1976 ds fu;e 10 ds mi fu;e ¼4½

ds vuqlj.k esa] bysDVªkWfudh vkSj lwpuk izkS|ksfxdh foHkkx ds iz'kklfud

fu;a=.k ds varxZr vkus okys izxr lax.ku fodkl dsUnz ¼lh&MSd½

uked Lok;Ùk laLFkk ds iq.ks fo'ofo|ky; ifjlj] x.ks'kf[kaM] iq.ks

fLFkr dk;kZy;] ftlds 80% ls vfèd deZpkfj;ksa us fgUnh dk

dk;Zlkèd Kku izkIr dj fy;k gS] dks vfèlwfpr djrh gSA

[lañ 7¼2½@2005&fgñvñ]

jktho dqekj] la;qDr lfpo

3996

THE GAZETTE OF INDIA : OCTOBER 10, 2015/ASVINA 18, 1937

[PART II—SEC. 3(ii)]

New Delhi, the 30th September, 2015

S.O. 1929.—In pursuance of Sub-Rule (4) of Rule 10 of

the Official Languages (Use for Official Purposes of the

Union) Rules, 1976, the Central Government hereby notifies

the Centre for Development of Advanced Computing (C-

DAC), an autonomous society under the administrative

control of the Department of Electronics & Information

Technology, located at Pune University Campus,

Ganeshkhind, Pune, whereof more than 80% staff have

acquired the working knowledge of Hindi.

[No.7 (2)/2005-H.S.]

RAJIV KUMAR, Jt.Secy.

ubZ fnYyh] 30 flrEcj] 2015

dk-vk- 1930-—dsaæ ljdkj] ,rn~}kjk jktHkk"kk ¼la?k ds 'kkldh;

iz;kstuksa ds fy, iz;ksx½ fu;e] 1976 ds fu;e 10 ds mi fu;e ¼4½

ds vuqlj.k esa] bysDVªkWfudh vkSj lwpuk izkS|ksfxdh foHkkx ds lEc)

dk;kZy; ekudhdj.k ijh{k.k rFkk xq.koÙkk izek.ku funs'kky; ds

d`f"k egkfo|ky; ifjlj] f'kokth uxj] iq.ks fLFkr vèhuLFk dk;kZy;]

bysDVªkWfudh ijh{k.k rFkk fodkl dsUnz] ftlds 80% ls vfèd

deZpkfj;ksa us fgUnh dk dk;Zlkèd Kku izkIr dj fy;k gS] dks

vfèlwfpr djrh gSA

[lañ 7¼2½@2005&fgñvñ]

jktho dqekj] la;qDr lfpo

New Delhi, the 30th September, 2015

S.O. 1930.—In pursuance of Sub-Rule (4) of Rule 10 of

the Official Languages (Use for Official Purposes of the

Union) Rules, 1976, the Central Government hereby notifies

the Electronics Test & Development Centre, a Subordinate

Office of Standardization Testing & Quality Certification

Directorate, an attached office of the Department of

Electronics & Information Technology, located at

Agriculture College Campus, Shivaji Nagar, Pune, whereof

more than 80% staff have acquired the working knowledge

of Hindi.

[No.7 (2)/2005-H.S.]

RAJIV KUMAR, Jt.Secy.

;qok dk;ZØe vkSj [ksy ea=ky;

ubZ fnYyh] 5 vDrwcj] 2015

dk-vk- 1931-—dsUnzh; ljdkj ,rn~}kjk jktHkk"kk ¼la?k ds

'kkldh; iz;kstuksa ds fy, iz;ksx½ fu;e 1976 ds fu;e 10 ds mi

fu;e ¼4½ ds vuqlj.k esa ;qok dk;ZØe vkSj [ksy ea=ky; ds

v/khuLFk dk;kZy; jk"Vªh; lsok ;kstuk {ks=h; funs'kky;] Hkksiky

¼e/; izns'k½ ftlds 80% ls vf/kd deZpkjhc`an us fganh dk

dk;Zlkèd Kku izkIr dj fy;k gS] dks vf/klwfpr djrh gSA

[fe- la- 11011@2@2008&fg-,-]

,lñ ,yñ ehuk] mi lfpo

MINISTRY OF YOUTH AFFAIRS AND SPORTS

New Delhi, the 5th October, 2015

S.O. 1931.—In pursuance of sub Rule (4) of Rule of 10

of Official Language (use for official purpose of the Union)

Rule 1976, the Central Government hereby notifies National

Service Scheme Regional Directorate, Bhopal (M.P.) a

Subordinate Office of Ministry of Youth Affairs & Sports,

whereof more than 80% staff have acquired working

knowledge of Hindi.

[F. No. E-11011/2/2008-H.U.]

S.L. MEENA, Dy. Secy.

dks;yk ea=ky;

ubZ fnYyh] 5 vDrwcj] 2015

dk-vk- 1932-—dks;yk /kkjd {ks= ¼vtZu vkSj fodkl½ vf/

kfu;e] 1957 ¼1957 dk 20½ ¼ftls blesa blds i'pkr~ mDr vf/

kfu;e dgk x;k gS½ dh /kkjk 9 dh mi&/kkjk ¼1½ ds v/khu tkjh Hkkjr

ljdkj ds dks;yk ea=ky; dh vf/klwpuk la[;kad dkñvkñ 600¼v½]

rkjh[k 19 Qjojh] 2015 tks Hkkjr ds jkti=] vlk/kkj.k] Hkkx II] [kaM

3] mi&[kaM (ii)] rkjh[k 23 Qjojh] 2015 esa izdkf'kr dh xbZ Fkh] mDr

vf/klwpuk ls layXu vuqlwph esa of.kZr Hkwfe ¼ftls blesa blds i'pkr~

mDr Hkwfe dgk x;k gS½ vkSj ,slh Hkwfe esa ;k ml ij ds lHkh vf/kdkj]

mDr vf/kfu;e dh /kkjk 10 mi&/kkjk ¼1½ ds v/khu] lHkh foYyaxeksa ls

eqDr gksdj] vkR;afrd :i ls dsUnzh; ljdkj esa fufgr gks x, gSa(

vkSj dsUnzh; ljdkj dk ;g lek/kku gks x;k gS] fd lsaVªy dksyQhYM~l

fyfeVsM] jkaph] >kj[kaM ¼ftls blesa blds i'pkr~ ljdkjh dEiuh dgk

x;k gS½] ,sls fuca/kuksa vkSj 'krks± dk ftUgsa dsUnzh; ljdkj bl fufeÙk

vf/kjksfir djuk mfpr le>s] vuqikyu djus ds fy, jtkean gS(

vr% vc] dsUnzh; ljdkj] mDr vf/kfu;e] 1957 dh /kkjk 11 dh

mi&/kkjk ¼1½ }kjk iznÙk 'kfDr;ksa dk iz;ksx djrs gq,] ;g funs'k nsrh gS]

fd bl izdkj fufgr Hkwfe esa ;k ml ij ds lHkh vf/kdkj dsUnzh; ljdkj

esa bl izdkj fufgr cus jgus ds ctk,] rkjh[k 23 Qjojh] 2015 ls

fuEufyf[kr fuca/kuksa vkSj 'krks± ds v/khu jgrs gq, ljdkjh daiuh esa

fufgr gks tk,axs] vFkkZr~%—

1- ljdkjh daiuh] mDr vf/kfu;e ds mica/kksa ds v/khu ;Fkk

vo/kkfjr izfrdkj] C;kt] uqdlkfu;ksa vkSj oSlh gh enksa dh

ckcr~ fd, x, lHkh lank;ksa dh dsUnzh; ljdkj dks izfriwfrZ

djsxh(

2- ljdkj daiuh }kjk 'krZ ¼1½ ds v/khu] mDr ljdkjh daiuh

}kjk dsUnzh; ljdkj dks lans; jdeksa dk vo/kkj.k djus ds

iz;kstuksa ds fy, /kkjk 14 ds v/khu ,d vf/kdj.k dk xBu

fd;k tk,xk rFkk ,sls fdlh vf/kdj.k vkSj ,sls

vf/kdj.k dh lgk;rk djus ds fy, fu;qDr O;fDr;ksa ds

laca/k esa mixr lHkh O;;] mDr ljdkjh daiuh }kjk ogu

fd, tk,axs vkSj blh izdkj fufgr mDr Hkwfe esa ;k ml ij ds

vf/kdkjksa ds fy, ;k muds laca/k esa vihy vkfn lHkh

fof/kd dk;Zokfg;ksa dh ckcr mixr] lHkh O;; Hkh] ljdkjh

daiuh }kjk ogu fd, tk,axs(

[Hkkx II—[k.M 3(ii)]

Hkkjr dk jkti= % vDrwcj 10] 2015@vkf'ou 18] 1937

3997

3- ljdkjh daiuh] dsUnzh; ljdkj ;k mlds in/kkfj;ksa dh]

,sls fdlh vU; O;; ds laca/k esa {kfriwfrZ djsxh tks bl

izdkj fufgr mDr Hkwfe esa ;k ml ij ds iwoksZDr vf/kdkjksa

ds ckjs esa] dsUnzh; ljdkj ;k mlds in/kkfj;ksa }kjk ;k

muds fo#) fdUgha dk;Zokfg;ksa ds laca/k esa vko';d gks(

4- ljdkjh daiuh ds ikl dsUnzh; ljdkj ds iwoZ vuqeksnu ds

fcuk] mDr Hkwfe;ksa esa iwoksZDr vf/kdkjksa dks fdlh vU;

O;fDr dks varfjr djus dh 'kfDr ugha gksxh( vkSj

5- ljdkjh daiuh] ,sls funs'kksa vkSj 'krks± dk] ikyu djsxh tks

dsUnzh; ljdkj }kjk] tc dHkh vko';d gks] mDr Hkwfe ds

fof'k"V {ks=ksa ds fy, fn, tk,a ;k vf/kjksfir fd, tk,aA

[Qkñ lañ 43015@14@2012&ihvkjvkbZMCY;w&I]

lqthr dqekj] voj lfpo

MINISTRY OF COAL

New Delhi, the 5th October, 2015

S.O. 1932.—Whereas, on the publication of the

notification of the Government of India in the Ministry of

Coal, number S.O. 600 (E), dated the 19th February, 2015,

published in the Gazette of India, Extraordinary, Part II,

Section 3, Sub-section (ii), dated the 23rd February, 2015,

issued under sub-section (1) of section 9 of the Coal Bearing

Areas (Acquisition and Development) Act, 1957 (20 of 1957)

(hereinafter referred to as the said Act), the land and all

rights over the said lands described in the Schedule

appended to the said notification (hereinafter referred to

as the said land) are vested absolutely in the Central

Government free from all encumbrances under sub-section

(1) of section 10 of the said Act;

And whereas, the Central Government is satisfied that

the Central Coalfields Limited, Ranchi, Jharkhand

(hereinafter referred to as the Government Company) is

willing to comply with such terms and conditions as the

Central Government thinks fit to impose in this behalf;

Now, therefore, in exercise of the powers conferred by

sub-section (1) of section 11 of the said Act, the Central

Government hereby directs that the land and all rights over

the said land so vested shall with effect from the

23rd February, 2015, instead of continuing to so vest in the

Central Government shall, vest in the Government Company,

subject to the following terms and conditions, namely:—

1. The Government Company shall reimburse to the

Central Government all payments made in respect

of compensation, interest, damages and the like, as

determined under the provisions of the said Act;

2. A Tribunal shall be constituted under section 14

of the said Act, for the purpose of determining

the amounts payable to the Central Government

by the said Government Company under

conditions (1) and all expenditure incurred in

connection with any such Tribunal and persons

appointed to assist the Tribunal shall be borne

by the said Government Company and similarly,

all expenditure incurred in respect of all legal

proceedings like appeals,etc. for or in connection

with the rights, in the said land, so vested, shall

also be borne by the Government Company.

3. The Government Company shall indemnify the

Central Government its officials against any other

expenditure that may be necessary in connection

with any proceedings by or against the Central

Government or its officials regarding the aforesaid

rights in the said land so vested;

4. The Government Company shall have no power

to transfer the aforesaid rights in the said lands

so vested, to any other persons without the prior

approval of the Central Government; and

5. The Government Company shall abide by such

directions and conditions as may be given or

imposed by the Central Government for particular

areas of the said lands as and when necessary.

[F. No. 43015/14/2012-PRIW-I]

SUJEET KUMAR, Under Secy.

fo|qr ea=ky;

ubZ fnYyh] 30 flrEcj] 2015

dk-vk- 1933-—17-08-2006 dks vf/kwlfpr eq[; fo|qr fujh{kd

vkSj fo|qr fujh{kd dh vgZrk] 'kfDr vkSj dk;Z fu;ekoyh] 2006 ds

lkFk ifBr fo|qr vf/kfu;e] 2003 ¼2003 dk 36½ dh /kkjk 162 dh

mi&/kkjk ¼1½ ds }kjk iznÙk 'kfDr;ksa dk iz;ksx djrs gq, dsanz ljdkj

,rn~}kjk Jh nsosUnz nÙk feJk] eq[; fo|qr vfHk;ark ¼vkbZvkj,lbZbZ½

ch,evkjlh,y dks bl vf/klwpuk dh rkjh[k ls cSaxyksj eSVªks jsy

dkjiksjs'ku fyfeVsM esa muds dk;Zdky rd] mi;qZDr fu;e esa mfYyf[kr

vgZrk vkSj 'krZ dks iwjk djus ds v/khu fu;qDr djrs gSaA Jhs nsosUnz nÙk

feJk dks Jh chñ thñ ekY;k] eq[; fo|qr fujh{kd ch,evkjlh,y ds

LFkku ij fu;qDr fd;k tk,xkA

mi;qZDr vf/kdkjh le;&le; ij ;Fkkla'kksf/kr dsUnzh; fo|qr

izkf/kdj.k ¼lqj{kk vkSj fo|qr vkiwfrZ ls lacaf/kr mik;½ fofu;e] 2010

esa nh xbZ izfØ;k ds vuqlkj] ch,evkjlh,y ds vf/kdkj okys {ks=ksa esa

izpkyuk/khu fo|qr jksfyax LVkWd ds laca/k esa vFkok ch,evkjlh,y ds

fu;a=.kk/khu@ch,evkjlh,y ls lac) lHkh oS|qr laLFkkiukvksa ds

laca/k esa vf/kdkjksa dk iz;ksx djsaxs vkSj vius&vius dk;Z fu"ikfnr

djsaxsA

ch,evkjlh,y ;g lqfuf'pr djsxk fd Jh nsosUnz nÙk feJk

ch,evkjlh,y esa eq[; fo|qr vfHk;ark ¼vkbZvkj,lbZbZ½ ds :i esa

mUgsa lkSais x;s dk;ks± dks djus ds laca/k esa eq[; oS|qr fujh{kd ugha gksaxsA

oS|qr fujh{kd ds :i esa fu;qDr vf/kdkjh og izf'k{k.k ysaxs ftls

dsUnz ljdkj bl mís'; ds fy, vko';d le>s rFkk ,slk izf'k{k.k

ljdkj dh larqf"V ds Lrj rd iwjk fd;k tk,xkA

[Qkñ lañ 42@3@2013&vkj ,.M vkj]

T;ksfr vjksM+k] la;qDr lfpo

3998

THE GAZETTE OF INDIA : OCTOBER 10, 2015/ASVINA 18, 1937

[PART II—SEC. 3(ii)]

MINISTRY OF POWER

New Delhi, the 30th September, 2015

S.O. 1933.—In exercise of the powers conferred by

sub-section (1) of Section 162 of the Electricity Act, 2003

(36 of 2003) read with Qualifications, Powers and

Functions for Chief Electrical Inspector and Electrical

Inspectors Rules, 2006 notified on 17.8.2006, the Central

Government hereby appoints Sh. Devedra Dutta Mishra,

Chief Electrical Engineer (IRSEE), BMRCL as Electrical

Inspector for Bangalore Metro Rail Corporation Ltd., from

the date of this Notification till his tenure in BMRCL,

subject to fulfilment of the Qualification and Condition

mentioned in the above Rule. Sh. Devendra Dutta Mishra

will be appointed in place of Sh. B.G. Mallya, Chief

Electrical Engineer, BMRCL.

The above mentioned officer shall exercise the powers

and perform his functions in respect of electrical works,

electrical installations and electrical rolling stock in

operation within the areas occupied by the BMRCL or in

respect of works and all electrical installations under the

control of BMRCL/belonging to BMRCL as per the

procedure provided in Central Electricity Authority

(Measures relating to Safety and Electricity Supply)

Regulations, 2010, as amended from time to time.

BMRCL will ensure that Sh. Devendra Dutta Mishra

will not be the Chief Electrical Inspector in respect of the

work assigned to him as Chief Electrical Engineer (IRSEE)

in BMRCL.

The person appointed as Electrical Inspector shall

undergo such training as the Central Government may

consider necessary for the purpose and such training shall

be completed to the satisfaction of the Government.

[F.No. 42/3/2013-R&R]

JYOTI ARORA, Jt. Secy.

ubZ fnYyh] 30 flracj] 2015

dk-vk- 1934-—17-08-2006 dks vf/klwfpr eq[; oSn~;qr fujh{kd vkSj fo|qr fujh{kd dh vgZrk] 'kfDr vkSj dk;Z fu;ekoyh] 2006 ds

lkFk ifBr fo|qr vf/kfu;e] 2003 ¼2003 dk 36½ dh /kkjk 162 dh mi/kkjk ¼1½ ds n~okjk iznRr 'kfDr;ksa dk iz;ksx djrs gq, dsanz ljdkj

,rnn~okjk dsanzh; fo|qr izkf/kdj.k ds fuEufyf[kr vf/kdkfj;ksa dks bl vf/klwpuk dh rkjh[k ls dsanzh; fo|qr izkf/kdj.k esa muds dk;Zdky rd]

mi;qZDr fu;e esa mfYyf[kr vgZrk vkSj 'krZ dks iwjk djus ds v/khu dsanzh; fo|qr izkf/kdj.k esa eq[; fo|qr fujh{k.k@oS|qr fujh{kd ds :i esa

fu;qDr djrh gS%&

Øe

uke

vgZrk

lhbZ, esa inuke

ds :i esa fu;qDr fd;k

lañ

tkuk gS

1-

Jh xkSre jk;¹

chñVsdñ ¼bathñ½] ¼fo|qr½

eq[; vfHk;ark

eq[; fo|qr fujh{kd

2-

Jherh eSjh Qzkafll

chñ,llhñ Vsdñ ¼bathñ½] ¼fo|qr½

mi funs'kd

fo|qr fujh{kd

3-

Jherh FkkWel dsñ pkdks

chñ,llhñ Vsdñ ¼bathñ½] ¼fo|qr½

mi funs'kd

fo|qr fujh{kd

¹ Jh xkSre jk; dks Jh Mhñ dsñ tSu ds LFkku ij eq[; fo|qr fujh{kd ds :i esa fu;qDr fd;k tkrk gSA

mi;qZDr vf/kdkjh le;&le; ij ;Fkkla'kksf/kr dsanzh; izkf/kdj.k ¼lqj{kk vkSj fo|qr vkiwfrZ ls lacaf/kr mik;½ fofu;e] 2010 esa nh xbZ izfØ;k ds

vuqlkj] dsanzh; fo|qr izkf/kdj.k ds vf/kdkj okys {ks=ksa esa izpkyuk/khu fo|qr jksfyax LVkWd ds laca/k esa vFkok dsanzh; fo|qr izkf/kdj.k ds fu;a=.kk/

khu@dsanzh; fo|qr izkf/kdj.k ls lEc) lHkh fo|qr laLFkkiukvksa ds laca/k esa vf/kdkjksa dk iz;ksx djsaxs vkSj vius&vius dk;Z fu"ikfnr djsaxsA

dsanzh; fo|qr izkf/kdj.k ;g lqfuf'pr djsxk fd mijksDr vf/kdkjh lhbZ, esa eq[; vfHk;ark@mi funs'kd ds :i esa mUgsa lkSais x;s dk;ks± dks djus

ds laca/k esa eq[; fo|qr fujh{kd@fo|qr fujh{kd ugha gksaxsA

fo|qr fujh{kd ds :i esa fu;qDr vf/kdkjh og izf'k{k.k ysaxs ftls dsanz ljdkj bl mís'; ds fy, vko';d le>s rFkk ,slk izf'k{k.k ljdkj

dh larqf"V ds Lrj rd iwjk fd;k tk,xkA

[Qkñlañ&42@3@2013&vkj,.Mvkj]

T;ksfr vjksM+k] la;qDr lfpo

New Delhi, the 30th September, 2015

S.O. 1934.—In exercise of the powers conferred by sub-section (1) of Section 162 of the Electricity Act, 2003 (36 of 2003)

read with Qualifications, Powers and Functions for Chief Electrical Inspector and Electrical Inspectors Rules, 2006 notified

on 17.08.2006, the Central Government hereby appoints following officers of CEA as Chief Electrical Inspector/Electrical

Inspector in CEA, from the date of this Notification till their tenure in CEA, subject to fulfilment of the qualification and

Condition mentioned in the above Rule:

[Hkkx II—[k.M 3(ii)]

Hkkjr dk jkti= % vDrwcj 10] 2015@vkf'ou 18] 1937

3999

S. No.

Name

Qualification

Designation

Appointed as

1.

Sh. Goutam Roy*

B.Tech. (Engg.) (Electrical)

Chief Engineer

Chief Electrical Inspector

2.

Mrs. Mary Francis

B. Sc. (Engg.) (Electrical)

Deputy Director

Electrical Inspector

3.

Sh. Thomas K. Chacko

B. Sc. (Engg.) (Electrical)

Deputy Director

Electrical Inspector

*Sh. Goutam Roy is appointed as Chief Electrical Inspector in place of Sh. D.K. Jain

The above mentioned officers will exercise the powers

and perform their respective functions in respect of

electrical works, electrical installations and electrical rolling

stock in operations within the areas occupied by the CEA

or in respect of works and all electrical installations under

the control of CEA/belonging to CEA as per the procedure

provided in Central Electricity Authority (Measures relating

to Safety and Electricity Supply) Regulations, 2010 as

amended from time to time.

CEA will ensure that abvoe officers will not be the Chief

Electrical Inspector/Electrical Inspector in respect of the work

assigned to him as Chief Engineer/Deputy Director in CEA.

The persons appointed as Electrical shall undergo such

training as the Central Government may consider it

necessary for the purpose and such training shall be

completed to the satisfaction of the Government.

[F.No.-42/3/2013-R&R]

JYOTI ARORA, Jt. Secy.

Je ,oa jkstxkj ea=ky;

ubZ fnYyh] 10 flrEcj] 2015

dk-vk- 1935-—vkS|ksfxd fookn vfèfu;e] 1947 ¼1947

dk 14½ dh èkjk 17 ds vuqlj.k esa dsUnzh; ljdkj fnfo'kuy

bathfu;j VsyhdkWe] Hkksiky ds izcaèra= ds lac) fu;kstdksa vkSj

muds deZdkjksa ds chp vuqcaè esa fufnZ"V vkS|ksfxd fookn esa dsUnzh;

ljdkj vkS|ksfxd vfèdj.k ,oa Je U;k;ky;] tcyiqj ds iapkV

¼lanHkZ la[;k lhthvkbZVh@,ylh@vkj@42@98½ dks izdkf'kr djrh

gS] tks dsUnzh; ljdkj dks 09@09@2015 dks izkIr gqvk FkkA

[lañ ,y&40012@21@96&vkbZ vkj ¼Mh;w½]

ihñ dsñ os.kqxksiky] MsLd vf/kdkjh

MINISTRY OF LABOUR AND EMPLOYMENT

New Delhi, the 10th September, 2015

S.O. 1935.—In pursuance of Section 17 of the Industrial

Disputes Act, 1947 (14 of 1947), the Central Government

hereby publishes the Award (I.D. Case No. CGIT/LC/R/42/

98) of the Central Government Industrial Tribunal-cum-

Labour Court, Jablapur now as shown in the Annexure in

the industrial Dispute between the employers in relation to

the management of the Divisional Engineer Telecom, Bhopal

and their workman, which was received by the Central

Government on 09/09/2015.

[No. L-40012/21/96-IR(DU)]

P. K. VENUGOPAL, Desk Officer

ANNEXURE

BEFORE THE CENTRAL GOVERNMENT

INDUSTRIAL TRIBUNAL-CUM-LABOUR COURT,

JABALPUR

No. CGIT/LC/R/42/98

Shri Ramdas S/o Shri Gangaram,

Village Jargaon, Post Bhageh,

Tehsil Dabra,

Distt. Gwalior (MP)

...Workman

Versus

Divisional Engineer Telecom (RE),

Arera Colony,

Bhopal

...Management

AWARD

Passed on this 13th day of August, 2015

1. As per letter dated 23-2-98 by the Government of

India, Ministry of Labour, New Delhi, the reference is

received. The reference is made to this Tribunal under

Section-10 of I.D. Act, 1947 as per Notification

No. L-40012/21/96-IR(DU). The dispute under reference

relates to:

"Whether the action of management of Divisional

Engineer Telecom (RE) Bhopal in terminating the

services of Shri Ramdas S/o Shri Gangaram w.e.f.

15-8-91 is legal and justified? If not, to what relief the

workman is entitled?"

2. After receiving reference, notices were issued to the

parties. Workman submitted statement of claim AT Pages

2/1 to 2/3. The case of workman is that he was engaged on

daily wages from 17-8-85 with 2nd party. He was working

with devotion at Gwalior till 30-4-86. From 10-6-86, workman

was engaged on daily wages at Bhopal. He was

continuously working till 14-8-91. On 15-8-91, his services

were orally discontinued. The oral termination is illegal. He

was not given one months notice or one months pay in lieu

of notice. He was not paid retrenchment compensation.

Without issuing showcause notice, his services were

terminated. That he had worked continuously more than

240 days. His termination is in violation of Section 25-F of

ID Act. Other persons engaged after him are continued in

employment in violation of Section 25-G of ID Act. For

terminating services of workman, permission of

4000

THE GAZETTE OF INDIA : OCTOBER 10, 2015/ASVINA 18, 1937

[PART II—SEC. 3(ii)]

Government was not obtained. On such ground, workman

is praying for his reinstatement with backwages.

3. 2nd party filed Written Statement at Pages 16/1 to 16/

2 opposing claim of the workman. 2nd party raised

preliminary objection that Railway electrification Project is

under control of Director of Railway Electrification of office

at Bhopal. Said office was established by Telecom

department. After completion of its work in 1990, said office

was closed. The record was destroyed after complying the

rules. Any information about working of Ist party is not

available. Claim of workman deserves to be rejected. 2nd

party reiterates that record relating to the working of Ist

party is not available. Compensation under ID Act was

paid to the retrenched labours. Permission for retrenchment

was taken from Competent Authority. Claim of workman is

without any basis. It is barrede by time limit. On such

ground, 2nd party prays for answering reference in its

favour.

4. Workman filed rejoinder reiterating its contentions in

statement of claim.

5. Considering pleadings on record, the points which

arise for my consideration and determination are as under.

My findings are recorded against each of them for the

reasons as below:—

"(i) Whether the action of the

In Negative

Management of Divisional

Engineer Telecom (RE) Bhopal in

terminating the services of Shri

Ramdas S/o Shri Gangaram w.e.f.

15-8-91 is legal and justified?

(ii) If so, to what relief the workman

As per final order.

is entitled to?"

REASONS

6. Ist party is challenging termination of his service for

violation of Section 25-G, H of ID Act. Workman filed affidvit

of his evidence supporting his contentions in statement of

claim. That he was working from 17-8-95 to 31-1-86 at Datia

from 1-2-86 to 30-4-86, he was required to work at Gwalior

laying the cables. From 10-6-86, he was engaged on daily

wages at Bhopal. He was continuously working at Bhopal

till 14-8-91. His services were orally discontinued from

15-8-91. That he was working with 2nd party for six years

during each of the calendar year, he completed more than

240 days continuous service. The details of his working

days are given in Para-4 of his affidavit. In his cross-

examination, workman says on 17-8-85, he was engaged by

Motilal Kushwaha. He was appointed at Datia where he

worked for one year. He was not appointed by contractor.

From Datia, he went to Bhopal for work. Before

discontinuing his services, SDO had contacted JTO. He

was orally terminated. Written order of termination was not

given to him. He denies that appointment letter in writing

was not given to him. That he had gone for work from

Datial to Bhopal, transfer order was not received. He was

unable to tell whether PF was deducted from his wages.

When he was transferred from Datia, said office was

working. Workman in his further cross denies that he was

working sometimes 8 days, 12 days, 15 days in a month.

Document Exhibit W-1 was referred to workman. Secondly

it was admitted in evidence. He denies that he had not

worked 240 days in any of the year. Before his engagement,

post was not advertised. Presently he is working in the

agricultural land. In document Exhibit W-1, the working

days of workman are shown more than 240 days during

each of the years 17-8-85 to June 88. The evidence of

workman is corroboraed by document Exhibit W-1.

7. Management's witness Shri R.V. Chouhan filed

affidavit supporting contentions of 2nd party in the

Written Statement. That the work of electrification project

was carried at different points. The office at Bhopal was

closed in 1990. The documents related to the project was

destroyed as per Rule-69 in Appendix-V. In his cross-

examination, witness of management says he is working

with 2nd party from April 84. He does not know the workman.

He had seen his service record. Work was completed in

1990. Presently he is working in BSNL since 1-10-00. At

that time option of employee working in Telecom Deptt.

was called. The option was also called from casual employee

working in Telecom department. Copy of rules about

distribution of rules is produced. Management's witness

has no personal knowledge. The document relating to the

working of Ist party could not be produced as stated above.

The evidence of workman is supported by document

Exhibit W-1. Workman had completed 240 days continuous

service during 1985 to 1988. Therefore I do not find reason

to disbelieve of workman. The services of workman are

discontinued without notice, no retrenchment

compensation was paid. Though 2nd party in its Written

Statement has contented that retrenchment compensation

was paid under ID Act, any document in that regard are not

produced by 2nd party. No document is also produced

about permission of Competent Authority for retrenchment

of employee is obtained. The contentions of 2nd party in

that regard are not substantiated by documents. It is clear

that services of workman are discontinued in violation of

section 25-F of ID Act, therefore I record my finding in

point No. 1 in Negative.

8. Point No. 2—termination of workman is found illegal

for violation of Section 25-F of ID Act, question remains

for consideration that workman is entitled for reinstatement

with backwages. The evidence of management's witness

that office of Railway Electrification project at Bhopal was

closed in 1998 is not shattered in its cross-examination.

Workman was engaged on daily wages. As per evidence in

cross-examination of workman, the post was not advertised.

Appointment letter in writing as not given to him. Copy of

award in R/274/97 is produced. In said case, violation of

[Hkkx II—[k.M 3(ii)]

Hkkjr dk jkti= % vDrwcj 10] 2015@vkf'ou 18] 1937

4001

Section 25-G was also established. Workman has not

disclosed names of any junior persons continued by 2nd

party therefore reinstatement of Workman could not be

possible. Considering nature of engagement of workman

and period of his engagement, compensation Rs. One Lakh

would be reasonable. Accordingly I record my finding in

points No.2.

9. In the result, award is passed as under:—

(1) The action of the management of Divisional

Engineer Telecom (RE) Bhopal in terminating the

services of Shri Ramdas S/o Shri Gangaram w.e.f.

15-8-91 is not proper and legal.

(2) 2nd party is directed to pay Rs. One Lakh

compensation to the workman.

Amount as per above order shall be paid to workman

within 30 days from the date of notification of award. In

case of default, amount shall carry 9% interest per annum

from the date of award till its realization.

R.B. RATLE, Presiding Officer

ubZ fnYyh] 29 flrEcj] 2015

dk-vk- 1936-—vkS|ksfxd fookn vf/kfu;e 1947 ¼1947 dk

14½ dh /kkjk 17 ds vuqlj.k esa dsUnzh; ljdkj j{kk vuqla/kku ,oa

fodkl laxBu] Xokfy;j ,oa vU; ds izca/kra= ds lac) fu;kstdksa

vkSj muds deZdkjksa ds chp vuqca/k esa fufnZ"V vkS|ksfxd fookn esa

dsUnzh; ljdkj vkS|ksfxd vf/kdj.k ,oa Je U;k;ky;] tcyiqj ds

iapkV ¼lanHkZ lañ lhthvkbZVh@,ylh@vkj@70@2002½ dks izdkf'kr

djrh gS] tks dsUnzh; ljdkj dks 18@09@2015 dks izkIr gqvk FkkA

[lañ ,y&14012@87@2001&vkbZvkj ¼Mh;w½]

ih- ds- os.kqxksiky] MsLd vf/kdkjh

New Delhi, the 29th September, 2015

S.O. 1936.—In pursuance of Section 17 of the Indistrial

Disputes Act, 1947 (14 of 1947), the Central Government

hereby publishes the award (I.D. Case No. CGIT/LC/R/70/

2002) of the Central Government Industrial Tribunal-cum-

Labour Court, Jabalpur now as shown in the Annexure in

the Industrial Dispute between the employers in relation to

the management of the Defence Research & Development

Organisation, Gwalior & Others and their workman, which

was received by the Central Government on 18/09/2015.

[No. L-14012/87/2001-IR(DU)]

P. K. VENUGOPAL, Desk Officer

ANNEXURE

BEFORE THE CENTRAL GOVERNMENT

INDUSTRIAL TRIBUNAL-CUM-LABOUR COURT,

JABALPUR

NO. CGIT/LC/R/70/2002

Shri Umesh Kumar,

S/o Shri Ramsewak,

R/o New Colony No. 1,

Qtr. No. 17,

...Workman

Birla Nagar, Gwalior

Versus

Director,

Defence Research & Development Organisation,

Gwalior.

M/S Sharma Construction,

Qr. No. 60, Line No. 14,

Birla Nagar,

...Management

Gwalior.

AWARD

Passed on this 1st day of September 2015

1. As per letter dated 26.4.02 by the Government of

India, Ministry of Labour, New Delhi, the reference

is received. The reference is made to this Tribunal

under Section-10 of I.D. Act, 1947 as per Notification

No. L-14012/87/2001-IR(DU). The dispute under

reference relates to:

"Whether the action of the management of Director,

Defence Research & Development Establishment

in terminating the services of Shri Umesh Kumar

S/o Shri Ramsewak Paswan w.e.f. 28.3.96 is justified? If

not, to what relief the workman is entitlted for?"

2. After receiving reference, notices were issued to the

parties. Workman submitted statement of claim at pages

2/1 to 2/3. Case of workman is that 2nd Party No. 1 had

issued letter dated 21.0.93 allowing 2nd Party No. 2 to

engage contract labour. 2nd Party No. 3 was allowed

contract of Rs. 20,000 as per order dated 1.2.93. Ist party

was working on daily wages with 2nd Party No. 3 from

December 1993 to 28.2.96. He was working continuously.

His services were terminated without notice. List of daily

wage employee was not displayed on notice board.

Workman prays for setting aside order of his termination

and reinstatement with backwages.

3. 2nd Party No. 1, 2 filed Written Statement at Pages

3/1 to 3/4 opposing claim of the workman. 2nd party submits

that their establishment is engaged in field of Defence

Research for Armed Forces. It is sovereign function.

Provisions of ID Act are not applicable to their

establishment. This Tribunal has no jurisdiction to decide

reference. That in order to expedite the projects, engage

workers for specific jobs through Private contractors. The

work related to project is of perennial nature. The work is

intermittent. When ever some work is mentioned

intermittent work activities increased. On 21.10.93, 2nd

Party No. 1, 2 awarded contract. M/S Sharma constructions

and Government supply is 2nd Party No. 3 for carrying out

4002

THE GAZETTE OF INDIA : OCTOBER 10, 2015/ASVINA 18, 1937

[PART II—SEC. 3(ii)]

various type of jobs at Rs. 20,000 per month. Workman

was engaged by 2nd party No. 3, 2nd Party No. 1, 2 were

not supervising work of the labours engaged by contractor.

Workman was not terminated by 2nd Party No. 1,2. The

contractor had terminated services of workman,

management has no control over him. On such ground,

2nd party prays reference be answared in its favour.

4. Considering pleadings on record, the points which

arise for my consideration and determination are as under.

My findings are recorded against each of them for the

reasons as below:—

"(i) Whether the action of the

2nd Party No. 1, 2

management of Director,

not engaged or

Defence Research & Development terminate the

Establishment in terminting the

workman.

services of Shri Umesh Kumar

S/o Shri Ramsewak Paswan .

w.e.f. 28.3.96 is justified?

(ii) If not, what relief the

Workman is not

workman is entitled to?"

entitled to any

relief.

REASONS

5. In his pleading and affidavit of evidence, workman

says that he was engaged by contractor 2nd Party No. 3.

the order of reference indicates that 2nd Party No. 3 is not

party to the dispute. His name is not appearing in order of

reference. From evidence and pleadings of workman, it is

clear that the workman was not engaged or terminated by

2nd Party No. 1,2 management rather workman was

engaged by construction contractor. He was not party to

the reference. In statement of claim, his name is added by

workman.

6. The evidence of management's witness Shri K. K.

Soni is devoted on the point that establishment of

2nd party is discharging sovereign functions of the State.

Contractor M/S Sharma Construction and Government

supply was engaged on contract on 21.10.93. The nature

of work assigned to the said contractor is not disclosed

whether his evidence is also not clear, what kind of work,

the work was carrying after his engagement by contractor

the contentions of 2nd party that it is not covered as

industry therefore cannot be upheld the evidence of

management's witness is clear that workman was engaged

by contractor. Copy of contract is produced by

management's witness at Exhibit M-1. The record about

payment of wages is produced at Exhibit M-2. The counter

files are produced at Exhibit M-3/1 to 3/13. The

management's witness denies that during 1993 to 1996,

workman was working with management of 2nd Party No.

1, 2. Any other evidence is not produced by workman that

he was working under 2nd party No. 1, 2 for more than 240

days working. 2nd Party No. 3 was not party to the reference.

7. Learned counsel for 2nd party Shri Chourasia

incidently relies on ratio held in Case of Rajkumar versus

Jalagaon Municipal Corporation reported in 2013 (1) SCC

L&S-471. Their Lordship dealing with termination of service

of casual labour, daily wager and judgment of Single Judge

and Division Bench of High Court that appellants were

temporarily appointed on daily wages as and when work

was available and not posted on regular basis against any

sanctioned post. Their Lordship held there is no reason

and justification to interfere with the orders passed by the

two courts refusing to set aside termination of appellants.

In para-7 of the judgment, their Lordship considering

promptness in approching proper forum payment of

Rs. 10,000 each of the appellants will not adequately

compensate. The compensation Rs. 50,000 each was

allowed.

Ratio in above cited case cannot be applied to present

case as Ist Party workman was neither engaged or

terminated by 2nd Party No. 1, 2. The workman was not

engaged or terminated by 2nd Party, rather he was engaged

or terminated by the contractor who is not party to the

dispute under reference. Accordingly I record my finding

in Pont No. 1.

8. In the result, award is passed as under:—

(1) The workman was not engaged or terminated by

2nd Party No. 1,2. The contractor was not party

to the reference.

(2) Workman is not entitled to any relief.

R.B. PATLE, Presiding Officer

ubZ fnYyh] 29 flrEcj] 2015

dk-vk- 1937-—vkS|ksfxd fookn vf/kfu;e 1947 ¼1947 dk

14½ dh /kkjk 17 ds vuqlj.k esa dsUnzh; ljdkj j{kk

vuqla/kku ,oa fodkl laxBu] Xokfy;j ,oa vU; ds izca/kr= ds

laca) fu;kstdksa vkSj muds deZdkjksa ds chp vuqca/k esa fufnZ"V

vkS|ksfxd fookn esa dsUnzh; ljdkj vkS|ksfxd vf/kdj.k ,oa Je

U;k;ky;] tcyiqj ds iapkV ¼lanHkZ lañ lhthvkbZVh@,ylh@

vkj@51@2002½ dks izdkf'kr djrh gS] tks dsUnzh; ljdkj dks

18@09@2015 dks izkIr gqvk FkkA

[lañ ,y&14012@88@2001&vkbZvkj¼Mh;w½]

ih- ds- os.kqxksiky] MsLd vf/kdkjh

New Delhi, the 29th September, 2015

S.O. 1937.—In pursuance of Section 17 of the Industrial

Disputes Act, 1947 (14 of 1947), the Central Government

hereby publishes the award (I.D. Case No. CGIT/LC/R/51/

2002) of the Central Government Industrial Tribunal-cum-

Labour Court, Jabalpur now as shown in the Annexure in

the Industrial Dispute between the employers in relation to

the management of the Defence Research & Development

[Hkkx II—[k.M 3(ii)]

Hkkjr dk jkti= % vDrwcj 10] 2015@vkf'ou 18] 1937

4003

Organisation, Gwalior & Others and their workman, which

was received by the Central Government on 18/09/2015.

[No. L-14012/88/2001-IR(DU)]

P.K. VENUGOPAL, Desk Officer

ANNEXURE

BEFORE THE CENTRAL GOVERNMENT

INDUSTRIAL TRIBUNAL-CUM-LABOUR COURT,

JABALPUR

No. CGIT/LC/R/51/2002

Shri P. V. Sharma,

M/s. Sharma Constructions,

Qr. No. 60, Line No. 4,

Birla Nagar, Gwalior

...Workman

Versus

Director,

Defence Research & Development Organisation,

Gwalior

M/s. Sharma Constructions,

Qr. No. 60, Line No. 14,

Birla Nagar,

...Management

Gwalior

AWARD

Passed on this 1st day of September, 2015

1.

As per letter dated 11.3.02 by the Government of

India, Ministry of Labour, New Delhi, the reference is

received. The reference is made to this Tribunal under

Section-10 of I.D. Act, 1947 as per Notification No. L-14012/

88/2001-IR(DU). The dispute under reference relates to:

"Whether the action of the management of Director,

Defence Research & Development Establishment in

terminating the services of Shri Munnalal Prajapati

S/o Shri Ramnandan Prajapati w.e.f. 28.3.96 is

justified? If not, to what relief the workman is entitled

for?"

2. After receiving reference, notices were issued to the

parties. Workman submitted statement of claim at page 2/1

to 2/3. Case of workman is that 2nd party No. 1 had issued

letter dated 21.09.93 allowing 2nd party No. 2 to engage

contract labour. 2nd party No. 3 was allowed contract of

Rs. 20,000 as per order dated 1.2.93. Ist party was working

on daily wages with 2nd party No. 3 from December, 1993

to 28.2.96. He was working continuously. His services were

terminated without notice. List of daily wage employee

was not displayed on notice board. Workman prays for

setting aside order of his termination and reinstatement

with backwages.

3. 2nd party No. 1, 2 filed Written Statement at Page 3/1

to 3/4 opposing claim of the workman. 2nd party submits

that their establishment is engaged in field of Defence

Research for Armed Forces. It is sovereign function.

Provisions of ID Act are not applicable to their

establishment. This Tribunal has no jurisdiction to decide

reference. That in order to expedite the projects, engage

workers for specific jobs through Private contractors. The

work related to project is of perennial nature. The work is

intermittent. When ever some work is mentioned

intermittent work activities increased. On 21.10.93, 2nd party

No. 1, 2 awarded contract. M/s. Sharma constructions and

Government supply is 2nd party No. 3 for carrying out

various type of jobs at Rs. 20,000 per month. Workman was

engaged by 2nd party No. 3. 2nd party No. 1, 2 were not

supervising work of the labours engaged by contractor.

Workman was not terminated by 2nd party No. 1, 2. The

contractor had terminated services of workman.

Management has no control over him. On such ground,

2nd party prays reference be answered in its favour.

4. Considering pleadings on record, the points which

arise for my consideration and determination are as under.

My findings are recorded against each of them for the

reasons as below:—

(i) Whether the action of the

2nd party No. 1, 2

management of Director,

not engage or

Defence Research & Development terminate the

Establishment in terminating the

workman.

services of Shri Munnalal Prajapati

S/o Shri Ramnandan Prajapati

w.e.f. 28.3.96 is justified?

(ii) If not, what relief the

Workman is not

workman is entitled to?"

entitled to any

relief.

REASONS

5. In his pleading and affidavit of evidence, workman

says that he was engaged by contractor 2nd party No. 3.

The order of reference indicates that 2nd party No. 3 is not

party to the dispute. His name is not appearing in order of

reference. From evidence and pleadings of workman, it is

clear that the workman was not engaged or terminated by

2nd party No. 1, 2 management rather workman was

engaged by construction contractor. He was not party to

the reference. In statement of claim, his name is added by

workman.

6. The evidence of management's witness Shri K.K. Soni

is devoted on the point that establishment of 2nd party is

discharging sovereign functions of the State. Contractor

M/s. Sharma Construction and Government supply was

engaged on contract on 21.10.93. The nature of work

assigned to the said contractor is not disclosed whether

his evidence is also not clear, what kind of work, the work

was carrying after his engagement by contractor. The

contentions of 2nd party that it is not covered as industry

therefore cannot be upheld. The evidence of management's

witness is clear that workman was engaged by contractor.

Copy of contract is produced by management's witness at

4004

THE GAZETTE OF INDIA : OCTOBER 10, 2015/ASVINA 18, 1937

[PART II—SEC. 3(ii)]

Exhibit M-1. The record about payment of wages is

produced at Exhibit M-2. The counter files are produced at

Exhibit M-3/1 to 3/13. The management's witness denies

that during 1993 to 1996, workman was working with

management of 2nd party No. 1, 2. Any other evidence is

not produced by workman that he was working under 2nd

party No. 1, 2 for more than 240 days working. 2nd party

No. 3 was not party to the reference.

7. Learned counsel for 2nd party Shri Chourasia

incidently relies on ratio held in Case of Rajkumar versus

Jalagaon Municipal Corporation reported in 2013(1) SCC

L& S-471. Their Lordship dealing with termination of service

of casual labour, daily wager and judgment of Single Judge

and Division Bench of High Court that appellants were

temporarily appointed on daily wages as and when work

was available and not posted on regular basis against any

sanctioned post. Their Lordship held there is no reason

and justification to interfere with the orders passed by the

two courts refusing to set aside termination of appellants.

In para-7 of the judgment, their Lordship considering

promptness in approaching proper forum payment of

Rs. 10,000 each to the appellants will not adequately

compensate. The compensation Rs. 50,000 each was

allowed.

Ratio in above cited case cannot be applied to present

case as Ist party workman was neither engaged or terminated

by 2nd party No. 1, 2. The workman was not engaged or

terminated by 2nd party, rather he was engaged or

terminated by the contractor who is not party to the dispute

under reference. Accordingly I record my finding in Point

No. 1.

8. In the result, award is passed as under:—

(1) The workman was not engaged or terminated by

2nd party No. 1, 2. The contractor was not party

to the reference.

(2) Workman is not entitled to any relief.

R.B. PATLE, Presiding Officer

ubZ fnYyh] 29 flrEcj] 2015

dk-vk- 1938-—vkS|ksfxd fookn vf/kfu;e] 1947 ¼1947

dk 14½ dh /kkjk 17 ds vuqlj.k esa dsUnzh; ljdkj vk;q/k dkj[kkuk]

bVkjlh ds izca/kra= ds lac) fu;kstdksa vkSj muds

deZdkjksa ds chp vuqca/k esa fufnZ"V vkS|ksfxd fookn esa dsUnzh;

ljdkj vkS|ksfxd vf/kdkj ,oa Je U;k;ky;] tcyiqj ds iapkV

¼lanHkZ lañ lhthvkbZVh@,ylh@vkj@01@99½ dks izdkf'kr djrh gS]

tks dsUnzh; ljdkj dks 18@09@2015 dks izkIr gqvk FkkA

[lañ ,y&14012@27@98&vkbZvkj ¼Mh;w½]

ihñdsñ os.kqxksiky] MsLd vf/kdkjh

New Delhi, the 29th September, 2015

S.O. 1938.—In pursuance of Section 17 of the Industrial

Disputes Act, 1947 (14 of 1947), the Central Government

hereby publishes the Award (I.D. Case No. CGIT/LC/R/1/

99) of the Central Government Industrial Tribunal cum-

Labour-Court, Jabalpur now as shown in the Annexure in

the Industrial Dispute Dispute between the employers in

relation to the management of the Ordnance Factory, Itarsi

and their workmen, which was received by the Central

Government on 18/09/2015.

[No. L-14012/27/98-IR (DU)]

P.K. VENUGOPAL, Dest Officer

ANNEXURE

BEFORE THE CENTRAL GOVERNMENT

INDUSTRIAL TRIBUNAL-CUM-LABOUR COURT,

JABALPUR

No. CGIT/LC/R/1/99

Shri Ashok Kumar Sarathe,

Oppo. Raj Talkies,

PO Itarsi,

Distt. Hoshangabad

... Workman

Versus

General Manager,

Ordnance Factory,

Itarsi (MP)

... Management

AWARD

Passed on this 14th day of July, 2015

1. As per letter dated 30-10/13-11/98 by the Government

of India, Ministry of Labour, New Delhi, the reference is

received. The reference is made to this Tribunal under

Section-10 of I.D. Act, 1947 as per notification No. L-14012/

27/98-IR(DU). The dispute under reference relates to:

"Whether the action of the management of Ordnance

Factory, Itarsi in:—

(a) Stopping 2 increments for 2 years without

cumulative effect on 12-5-86,

(b) Stoppage of next increment for 2 years without

cumulative effect on 19-7-89 and

(c) in terminating Shri Ashok Kumar Sarathe is legal

and justified? If not, to what relief the workman is

entitled for?"

2. After receiving reference, notices were issued to the

parties. Ist party workman submitted statement of claim at

Page 4/1 to 4/6. Case of Ist party is that Government has

referred the dispute relating to the action of the

management of Ordinance Factory, Itarsi in stopping two

increments on 12.5.86 and 19.7.89 and legality of termination

of workman. Workman was served with chargesheet dated

11.8.89. The charges against workman were that on 26.7.89

at 12.10 hours, while shri B.K. Biswas Works Manager was

coming from CWS Section, he was obstructed by the

[Hkkx II—[k.M 3(ii)]

Hkkjr dk jkti= % vDrwcj 10] 2015@vkf'ou 18] 1937

4005

applicant and one Shri Laxmi Narain Gahlot and beaten

Mr. Biswas causing injuries to his left arm another charge

alleged was of habital offender punished earlier.

Chargesheet was replied by workman on 24.9.90 denying

the charges against him. He was called to file statement of

his defence witness. Shri M. V. Murleedharan was

appointed as Enquiry Officer. Similar enquiry was

conducted against Laxmi Narain Gahlot by same Enquiry

Officer. Workman did not examine themselves. The defence

statement was submitted jointly by workman and

Shri Gehlot.

3. Management examined Shri S.L. Gehlot, R.K. Verma

on 13.2.90. Shri B.K. Biswas was examined on 4.4.90. Prior

to DE against workman, preliminary enquiry was conducted,

statement of Shri Gahlot, Ram Brij Prasad, Ram Kumar and

Shyam Singh were recorded on 26.7.89. Joint enquiry was

ordered on 4.10.89. Enquiry Officer submitted his report on

24.7.90. Its copy was supplied to workman on 3.8.90.

Management ordered that report of Enquiry Officer shall

be considered after receiving representation of the

workman, 15 days time was granted for submitting Defence

statement. Laxmi Gahlot submitted his representation on

15.9.90. Their representation was not taken into

consideration. Management issued letter dated 20.9.90.

Ist party workman submits that he was dismissed on 5.10.90.

His appeal was dismissed on 6.11.90. It is reiterated that

enquiry was not properly conducted. There was no eye

witness to the incident of beating. Prosecution witness

given statement. Enquiry Officer found him guilty. The

finding of Enquiry Officer is perverse. Shri Biswas had also

submitted report to save himself alleging workman had

stopped him. It is an act unbecoming on party of the officer.

The Disciplinary Authority accepted oral evidence of

Shri Biswas. The defence evidence was not accepted. On

such ground, it is submitted that the order of punishment

of dismissal is illegal.

4. Management of 2nd party filed Written Statement at

Page 6/1 to 6/4. Charges against workman was reproduced

in Para 1 of Written Statement. 2nd party submits that

workman was appointed as Darban on 20.3.80. He was

transferred as unskilled labour w.e.f. 1.7.85 in Pay Scale

196-212. During the service tenure, workman committed

several misconduct on different occasions. Disciplinary

action were initiated against him as per CCS Rules.

Punishment of stoppage of increments on 12.5.86, 19.7.89

were imposed after conducting enquiry. Punishment of

dismissal was imposed after conducting enquiry as per

CCS Rules. 2nd party separately submits that in 1986,

workman was posted in transport section. On 29.3.86, he

left his place of work and participated in illegal

demonstration, slogan shouting and resorted to dharna in

front of General Manager's Office on 29.3.86 from 12.15

hours. Chargesheet was issued to him under Rule 16. Gross

misconduct of absenting him from place of work participated

in demonstration, shouting slogans committed by workman

were an act of unbecoming of a Government servant. Reply

submitted by workman on 17.4.76 was considered. The

contention of workman was rejected. Penalty of withholding

3 increments without cumulative effect was imposed for

3 years. W.r.t. stoppage of two increments vide order dated

19.7.89, 2nd party submits that workman was posted at

Steam services Maintenance Section. On 20.5.89, workman

left place of his working alongwith Laxminarayan skilled

labour. It was also reported that on 31.5.89, workman did

not perform his assigned duty. Therefore chargesheet was

issued to him under Rule 16 for gross misconduct issued

from place of work during duty hours. Workman was given

10 days time to file reply. Workman did not submit any

reply. Punishment of with holding two increments was

imposed with cumulative effect.

5. W.r.t punishment of dismissal order dated 5.10.90

submits that chargesheet for gross misconduct assaulting

Gazetted Officer, habitual offender was issued to workman

and one Laxmi Gahlot. Workman denied charges against

him. Common order was passed under Rule 18(1) & (2)

CCS(CCA) Rules for conducting common enquiry. It is

reiterated that rules were followed while conducting enquiry.

Workman and Laxmi Narayan were guilty of the charges

framed against him. Punishment of dismissal from service

was imposed on him. The appeal filed by workman dated

6-11-90 was dismissed by speaking order dated 11-3-91.

2nd party submits that there is enough evidence on record

supporting findings of Enquiry Officer. No illegality is

committed while imposing the punishment. Workman filed

OA No. 246/92 before CAT, Jabalpur. 2nd party, submits

that if enquiry is found vitiated, 2nd party be permitted to

lead evidence to prove misconduct against workman. 2nd

party reiterated that punishment of dismissal imposed

against workman is legal. As per order dated 26-2-2012,

enquiry is found illegal. Management was permitted to

prove misconduct adducing evidence.

6. Considering pleadings on record, the points which

arise for my consideration and determination are as under.

My findings are recorded against each of them for the

reasons as below:—

(i)

Whether the action of the

In Affirmative

management of Ordnance Factory,

Itarsi in Stopping 2 increments for

2 years without cumulative effect

on 12-5-86 is proper and legal?

(ii) Whether the action of the

In Affirmative

management of Ordnance Factory,

Itarsi in Stoppage of next increment

for 2 years without cumulative effect

on 19-7-89 is proper and legal?

(iii) Whether the action of the

In Negative

management of Ordnance Factory,

Itarsi in terminating Shri Ashok

Kumar Sarathe is proper and legal?

4006

THE GAZETTE OF INDIA : OCTOBER 10, 2015/ASVINA 18, 1937

[PART II—SEC. 3(ii)]

(iv) If not, what relief the

As per final

workman is entitled to?"

order.

REASONS

7. Enquiry conducted against workman is found illegal

as per order dated 26-6-2012. The terms of reference

withholding two increments of workman as per order dated

12-5-86 & 19-7-89. The reference dispute is relating to those

punishment is referred as per order dated 30-10-98 almost

12-9 years. Enquiry conducted against workman held illegal

relates to punishment of dismissal imposed against

workman. Order dated 26-6-2012 does not reflect detailed

reasons of enquiry. Those punishment were found illegal

as per Written statement filed by 2nd party. To chargesheet

issued to workman, reply given by management was found

satisfactory. Punishment of withholding increments was

imposed. Dispute is raised after 12-9 years. Considering

the delay, the dispute is raised, the dispute w.r.t. punishment

of withholding two increments vide order dated 12-5-86,

19-7-89 would not be tenable. Legal position rather settled

that the dispute referred after period of 7 years are not

tenable. After finding of my predecessor, the enquiry

conducted against workman was found illegal, 2nd party

was permitted to prove misconduct in Court.

8. Management filed evidence of witness Shri Hemant

Kumar Paikra. His affidavit is devoted on the point of

conducting enquiry against workman on complaint of

Shri B.K. Biswas Works Manager who was Group A

Gazetted Officer. In para 5.1 of his affidavit, management's

witness has narrated the workman and other employees

Laxminarayan were sending at the corner of the building of

said section obstructed him at that place. When the officer

enquired about the cause of obstruction, Shri Laxmi Narayan

told him in Hindi "Tumse aur kya bolna" and both of them

stared beating the officer with their hands, the officer had

caught hold Shri Laxmi Narayan and shouted for help. On

his calling, when staff members of CW section came out,

the workman twisted the hands of the officer and got his

accomplice released. The officer had suffered injury and

he submitted a complaint on that day itself. The complaint

dated 26-7-89 alongwith statements dated 26-7-89 of

witnesses are enclosed. Since the Officer had suffered

injury due to assault, he was sent to Ordnance Factory,

Itarsi Hospital for medical examination and treatment. His

affidavit is further devoted in Para 5.3 that documents

available on record, workman was habitual of committing

misconduct while on duty. Punishment was imposed. His

affidavit is further devoted on point of imposing

punishment of withholding two increments. Order No. 1258

for misconduct of workman absenting from duty and

missing form place of work. The affidavit of management's

witness does not disclose that he was witness to the

incident, what was his source of knowledge of the incident.

It also not disclosed. In his cross-examination,

management's witness says he was working in Ordnance

Factory since 2007. He has no personal knowledge of

chargesheet issued to workman. He admits that two

increments of workman w.r.t. charge of unauthorized

absence. He doesnot know whether the workman was active

Union leader or workman was taking dispute of workers to

the management. Management's witness claims ignorance

whether management was annoyed with the workman. The

management's witness admits that again two increments of

workman were with held for charge of missing from the

place of work. He claims ignorance whether before imposing

punishment, enquiry was conducted. That his affidavit is

based on documents. The zerox copy of record are filed at

R/7, R/8 the chargesheet issued on 11-8-89. The complainant

had not given evidence in DE in his presence. Once DE

conducted against workman is found vitiated, evidence

recorded in Enquiry Proceedings cannot be considered in

support of charge.

9. The evidence of workman on the point that he was

wrongly involved in the case by Shri B.K. Biswas, Work

Manager. On 26-7-89, he attended his duty. He had not

brought his tiffin therefore he had gone to C.W. Section.

He asked Aziz Khan to bring his tiffin. However Aziz Khan

did not bring his tiffin for want of time and therefore he was

going out for taking lunch. His affidavit is devoted on the

point that there was old dispute between Gehlot, co-worker

and Works Manager. He was also implicated in the matter.

The management failed to cross-examine the workman. His

evidence remained unchallenged. The evidence of

management's witness is not disclosing whether he was

dye witness of the incident, what was source of his

knowledge about recording of statement of witnesses. The

evidence of management's witness is not based on his

personal knowledge about incident of beating Works

Manager, Shri B.K. Biswas by workman. The evidence of

management's witness cannot prove charge No. 3 against

workman. The evidence of workman about said incident

remain unchallenged and I do not find any reason to discard

evidence of workman.

10. As stated above, the punishment of withholding

two increments of workman was imposed on 12-5-86 and

19-7-89. The dispute w.r.t. said punishment is referred along

with the withheld charge for which the workman was

dismissed from service. The dispute raised w.r.t. those

punishments after 9-12 years is belated. Therefore action

of the management withholding increment by those orders

cannot be interviewed. So far as punishment of dismissal

imposed against workman after enquiry, enquiry is vitiated

and evidence of management's witness does not show

source of his knowledge about his evidence of the incident.

His affidavit does not disclose whether he is witness to the

incident whether his affidavit is based on the documents.

But since the enquiry is vitiated, evidence in Enquiry

Proceedings cannot be considered. The charge about

assaulting Shri B.K. Biswas by workman is not proved.

The action of the management in imposing punishment of

[Hkkx II—[k.M 3(ii)]

Hkkjr dk jkti= % vDrwcj 10] 2015@vkf'ou 18] 1937

4007

dismissal cannot be sustained. It is illegal. Accordingly I

record my finding in Point No. 1.

11. In view of my finding in Point No. 1 charge w.r.t.

assaulting and inflicting injury by workman on Works

Manager, Shri B.K. Biswas is not proved. The note of

argument submitted by management counsel relates to

course of dispute and enquiry conducted against workman

imposing punishment of dismissal. The order dated

26-6-2012 also shows that the management has not adduced

evidence. The original Enquiry Proceedings were not

produced. Management's witness is not cross-examined.

The punishment of dismissal imposed on workman cannot

be sustained. Therefore punishment of dismissal imposed

on workman deserves to be set-aside. Workman in his

affidavit of evidence has stated that after dismissal from

service, he could not get other job despite of repeated

efforts made by him. His wife is doing work of cleaning

utensil of other house. He is unemployed. His evidence

remained unchallenged. Management has not adduced any

evidence that workman was in gainful employment after

dismissal from his service. Considering the evidence on

record and charge of assault and inflicting injury is not

proved, the workman is entitled for reinstatement with

backwages. Accordingly I record my finding in Point No. 2.

12. In the result, award is passed as under:—

(1) The action of the management imposing

punishment of dismissal workman is illegal. The

punishment of Stopping 2 increments for 2 years

without cumulative effect vide order dated

12-5-86 & 19-7-89 cannot be said illegal as dispute

raised is highly belated.

(2) The order of dismissal of workman is set-aside.

(3) 2nd party is directed to reinstate workman with

continuity of service with full backwages

(4) 2nd party shall pay cost of Rs. 3000/- to the

workman.

R.B. PATLE, Presiding Officer

ubZ fnYyh] 29 flrEcj] 2015

dk-vk- 1939-—vkS|ksfxd fookn vf/kfu;e] 1947 ¼1947

dk 14½ dh /kkjk 17 ds vuqlj.k esa dsUnzh; ljdkj iksLV vkWfQl xquk

fMohtu ds izca/kra= ds lac) fu;kstdksa vkSj muds deZdkj ds chp]

vuqca/k esa fufnZ"V vkS|ksfxd fookn esa dsUnzh; ljdkj vkS|ksfxd

vf/kdj.k ,oa Je U;k;ky; tcyiqj ds iapkV ¼lanHkZ lañ

lhthvkbZVh@,ylh@vkj@107@00½ dks izdkf'kr djrh gS tks dsUnzh;

ljdkj dks 18@09@2015 dks izkIr gqvk FkkA

[lañ ,y&40012@16@2000&vkbZvkj¼Mh;w½]

ihñ dsñ os.kqxksiky] MsLd vf/kdkjh

New Delhi, the 29th September, 2015

S.O. 1939.—In pursuance of Section 17 of the Industrial

Disputes Act, 1947 (14 of 1947), the Central Government

hereby publishes the award (I.D. Case No. CGIT/LC/R/

107/00) of the Central Government Industrial Tribunal-cum-

Labour Court, Jabalpur now as shown in the Annexure in

the Industrial Dispute between the employers in relation to

the management of the Post Office, Guna Division and

their workman, which received by the Central Government

on 18/09/2015.

[No. L-40012/16/2000-IR(DU)]

P.K. VENUGOPAL, Desk Officer

ANNEXURE

BEFORE THE CENTRAL GOVERNMENT

INDUSTRIAL TRIBUNAL-CUM-LABOUR

COURT, JABALPUR

NO. CGIT/LC/R/107/00

Shri Ajaj Ahmed

S/o Shahjad Ahmed,

R/o Bahadurpur,

Tehsil Mungavali,

Guna ..........

.... Workman

Versus

Superintendent,

Post, Office, Guna Division,

Guna

.....Management

AWARD

Passed on this 2nd day of September, 2015

1. As per letter dated 21-6-00 by the Government of

India, Ministry of Labour, New Delhi, the reference is

received. The reference is made to this Tribunal under

Section-10 of I.D. Act, 1947 as per Notification No. L-40012/

16/2000-IR(DU). The dispute under reference relates to:

‘‘Whether the action of the management of

Superintendent of Post Office in terminating the

services of Shri Ajaj Ahmed S/o Shahjad Ahmed

w.e.f. 22-9-97 is justified? If not, to what relief the

workman is entitled?"

2. After receiving reference, notices were issued to the

parties. Ist party workman submitted statement of claim at

Page 8/1 to 8/4. Case of workman is that he was appointed

as postman on 16-3-78. His services were illegally terminated

on 22-9-97. That enquiry conducted against him is illegal.

The order of his termination is also illegal. Principles of

natural justice were not followed. He was not supplied

documents of preliminary enquiry and imposed documents

in enquiry. He was not allowed Defence Assistant by

Enquiry Officer. Shri S.P. Srivastava, Suptd. at Puna was

appointed as Enquiry Officer in violation of Discipline

4008

THE GAZETTE OF INDIA : OCTOBER 10, 2015/ASVINA 18, 1937

[PART II—SEC. 3(ii)]

Appeal rules. He was not paid subsistence allowance during

suspension period. He was not allowed opportunity to

cross-examine management's witnesses. The findings of

Enquiry Officer are perverse. After termination of his

services, he is unemployed. On such ground, workman

prays for his reinstatement with backwages.

3. 2nd party filed Written Statement at Page 10/1 to 10/5

opposing claim of the workman. 2nd party submits that

chargesheet was issued to workman for misconduct on

23-1-96. Enquiry Officer was appointed to Shri A. K. Yadav,

Asstt. Suptd., Guna. Shri S.P. Srivastava Suptd. At Guna

was appointed as Presenting Officer. Shri R.K. Soni was

Defence Asstt. for workman. He had taken inspection of

documents. Enquiry was conducted on various dates. The

witnesses of management were present for cross-

examination. The workman admitted the charges against

him and declined to cross-examine management's

witnesses. The enquiry is conducted properly. Workman

was allowed opportunity for his defence. Considering

report of Enquiry Officer, charges against workman were

proved. Punishment of dismissal was imposed. The appeal

preferred by workman challenging his dismissal was

dismissed. 2nd party reiterates that workman was allowed

opportunity for his defence. 2nd party submits that

reference be answered in its favour.

4. Enquiry conducted against workman is found legal

as per order dated 29-11-2013.

5. Considering pleadings on record, the points which

arise for my consideration and determination are as under.

My findings are recorded each of them for the reasons be

below:—

(i)

Whether the miscondcut

alleged against workman is

In Affirmative

proved from evidence in

Enquiry proceedings?

(ii)

Whether the punishment of

dismissal imposed against

In Nagative

workman is proper and legal?

(iii)

If not, what relief the

As per final order.

workman is entitled to?"

REASONS

6. The chargesheet was issued to Ist party workman.

The misconduct alleged against him is workman while

working as EPMC/AA at Bhadurpur, Mungavali on

17-12-94, the bag sent from Accounts Officer Mungavali

for branch Bauro was received by workman in proper

condition. Said bag received in Bahadurpur Core branch

was found its seal missing when it was opened in presence

of Ram Narayan Sharma and Kailash Giri. As enquiry

conducted against workman is found proper and legal, the

evidence in Enquiry Proceedings needs to be considered

for deciding whether misconduct alleged against workman

is proved. The documents in Enquiry Proceedings at Page

10/12 shows that on 13-1-97, when enquiry was fixed, CSE

received chargesheet. He denied charges against him the

enquiry was fixed on 5-2-97. Documents were supplied to

workman. The enquiry was fixed on 30-4-97. The witnesses

of management were present on that day. Workman

submitted his submissions in writing admitting charges

against him. Therefore management's witnesses were not

examined. When workman admitted charges against him,

infact other evidence is required to prove the misconduct

in view of Section 58 of Evidence Act. therefore I record my

finding in Point No. 1 in Affirmative.

7. Point No. 2. In view of my finding in Point No. 1

misconduct alleged against workman that postal bag handed

over to workman on 17-2-94 was delivered at EPM

Bahadurpur, its seal was found missing. There is no

evidence in the enquiry that any kind of articles were

missing from the postal bag. Merely as the seal on postal

bag was found missing proved against workman,

punishment of dismissal imposed against workman appears

highly disproportionate.

8. The citation are submitted in Case of J.H. Patel Versus

Nuboard Mfg Co. Ltd reported in 2014 LAB.I.C. 1278.. ratio

held in the case relates to evidence not discussed by Labour

Court to reach to the conclusion that misconduct of

workman was proved. The findings of Labour Court that

punishment proved by management was liable to be

setaside.

In present case, workman admitted charges alleged

against him. Though the management's witnesses were

present, they were not examined. The ratio held in above

case cannot be applied to case at hand.

Next reliance is placed in case of K. Kalirajan and

Presiding Officer, CGIT-cum-labour Court and another

reported in 2013 (136) FLR-384. In above cited case, out of

5 charges, 4 were not proved against petitioner. He was

dismissed by Disciplinary Authority Industrial Tribunal

found only one and first charge proved. Other charges are

not proved. The petitioner had worked for more than 15

years and had no prior record of any misnomer, their

Lordship held therefore CGIT ought to have exercised its

discretion under Section 11-A of Act. The award was set

aside and reinstatement with 50% backwages was allowed.

The facts of present case are not comparable as

workman has admitted charge against him. In view of

Section 58 of Evidence Act, no further evidence was required

to be recorded in the enquiry. However the charge of

misconduct alleged workman is seal on the postal bag found

missing. When there is no evidence about missing of any

postal articles, the gravity of misconduct proved against

workman cannot be said serious. Therefore punishment of

dismissal imposed against workman is excessive and

disproportionate. Considering workman had completed

[Hkkx II—[k.M 3(ii)]

Hkkjr dk jkti= % vDrwcj 10] 2015@vkf'ou 18] 1937

4009

19 years servcie without any adverse record, the dismissal

of workman deserves to be set aside. The age of workman

is shown 55 years in affidavit of evidence filed on 2-12-09.

The workman may have attained the age of superannuation,

therefore reinstatement is not possible. Considering facts

of the case, in my considered view, compensation

Rs. 3,00,000 would be appropriate relief.

9. In the result, award is passed as under:—

(1) The action of the management of Superintendent

of Post Office in terminating the services of Shri

Ajaj Ahmed S/o Shahjad Ahmed w.e.f. 22-9-97 is

not proper and legal.

(2) 2nd party management is directed to pay

compensation Rs. 3,00,000 to the workman.

Amount as per above order shall be paid to workman

within 30 days from the date of notification of award. In

case of default, amount shall carry 9% interest per annum

from the date of award till its realization.

R.B. PATLE, Presiding Officer

ubZ fnYyh] 29 flrEcj] 2015

dk-vk- 1940-—vkS|ksfxd fookn vf/kfu;e 1947 ¼1947 dk

14½ dh /kkjk 17 ds vuqlj.k esa dsUnzh; ljdkj fMikVZesaV vkWQ

nwjlapkj ds izca/kr= ds lac) fu;kstdksa vkSj muds deZdkj ds chp

vuqca/k esa fufnZ"V vkS|ksfxd fookn esa dsUnzh; ljdkj vkS|ksfxd

vf/kdj.k ,oa Je U;k;ky;] tcyiqj ds iapkV ¼lanHkZ la[;k

lhthvkbZVh@,ylh@vkj 98@00½ dks izdkf'kr djrh gS tks dsUnzh;

ljdkj dks 18@09@2015 dks izkIr gqvk FkkA

[lañ ,y&40012@81@2000&vkbZ vkj ¼Mh;w½]

ihñ dsñ os.kqxksiky] MsLd vf/kdkjh

New Delhi, the 29th September, 2015

S.O. 1940.—In pursuance of Section 17 of the Industrial

Disputes Act, 1947 (14 of 1947), the Central Government

hereby publishes the award (I.D. Case No. CGIT/LC/R/98/

00) of the Central Government Industrial Tribunal-cum-

Labour Court, Jabalpur now as shown in the Annexure in

the Industrial Dispute between the employers in relation to

the management of the Department of Telecommunication

and their workman, which was received by the Central

Government on 18/09/2015.

[No. L-40012/81/2000-IR(DU)]

P.K. VENUGOPAL, Desk Officer

ANNEXURE

BEFORE THE CENTRAL GOVERNMENT

INDUSTRIAL TRIBUNAL-CUM-LABOUR COURT,

JABALPUR

No. CGIT/LC/R/98/00

Shri Mahesh Kumar Mavare,

S/o G. Mavere

R/o Bhopal Road Narsingarh,

Nr. Chanak Talkies, Tehsil Narsingarh,

Rajgarh (MP)

...Workman

Versus

Chief General Manager,

Deptt. of Telecommunication,

Hoshangabad Road,

MP Circle, Bhopal

Telecom District Engineer,

Rajgarh, At Biaora,

Rajgarh (MP

...Management

AWARD

Passed on this 27th day of August, 2015

1. As per letter dated 31-5-00 by Government of India,

Ministry of Labour, New Delhi, the reference is received.

The reference is made to this Tribunal under Section 10 of

I.D. Act, 1947 as per Notification No. L-40012/81/2000-

IR(DU). The dispute under reference relates to:

‘‘Whether the action of the management of Chief

General Manager, Telecom in terminating the services

of Shri Mahesh Kumar Navare S/o Shri Gourdhanlal

Mavare w.e.f. January 1997 is justified? If not, to what

relief the workman is entitled?"

2. After receiving reference, notices were issued to the

parties. Case of Ist party workman is that he was initially

appointed in 1991 as casual labour in Telecom Department,

Narsingarh, Rajgarh District. He continuously worked till

1996 without any break. He was appointed on permanent

vacant post. He completed more than 240 days continuous

service in January 1997. His services were terminated

without following legal precedure. Action of management

terminating his servcie is by victimization. Instead of

regularizing the workman was terminated in violation of

Section 25-F of ID Act is illegal. On such ground, workman

prays for his reinstatement with backwages.

3. 2nd party filed Written Statement at Page 5/1 to 5/2

opposing claim of the workman. 2nd party submits that

workman was never engaged by it. Claim of workman for

regularisation is baseless, fabricated. 2nd party not violated

any provisions of ID Act. Workman had not completed 240

days service in any year. 2nd party prays reference be

answered in its favour.

4. Considering pleadings on record, the points which

arise for my consideration and determination are as under.

My findings are recorded against each of them for the

reasons as below:—

4010

THE GAZETTE OF INDIA : OCTOBER 10, 2015/ASVINA 18, 1937

[PART II—SEC. 3(ii)]

(i)

Whether the action of the

In Affirmative

management of Chief

General Manager, Telecom

in terminating the services

of Shri Mahesh Kumar

Navare S/o Shri Gourdhanlal

Mavare w.e.f. January 1997

is justified?

(ii)

If not, what relief the

Workman is not

workman is entitled to?"

entitled to any relief.

REASONS

5. Though workman challenged termination of his

service by raising dispute, statement of claim is filed on its

behalf. Workman failed to adduce evidence in support of

his claim. Evidence of workman is closed on 13-11-2013.

Claim of workman is not supported by any evidence.

6. Management's witness Shri Ranjani Khan filed

affidavit of his evidence. The witness denied that workman

completed 240 days continuous service. In his cross-

examination, management's witness says any vouchers

regarding working of 1st party is not produced. Witness

says workman had not done any work in the establishment

of 2nd party. He has denied suggestion that workman

worked for 2-3 years. As claim of workman is not supported

by evidence, I record may finding in Point No. 1 in

Affirmative.

7. In the result, award is passed as under:—

(1) The action of the management of Chief General

Manager, Telecom in terminating the services of

Shri Mahesh Kumar Navare S/o Shri Gourdhanlal

Mavare w.e.f. January 1997 is proper and legal.

(2) Workman is not entitled to any relief.

R. B. PATLE, Presiding Officer

ubZ fnYyh] 29 flrEcj] 2015

dk-vk- 1941-—vkS|ksfxd fookn vf/kfu;e 1947 ¼1947 dk

14½ dh /kkjk 17 ds vuqlj.k esa dsUnzh; ljdkj nwjn'kZu dsUnz] t;iqj

ds izca/kra= ds lac) fu;kstdksa vkSj muds deZdkj ds chp vuqca/k

esa fufnZ"V vkS|ksfxd fookn esa dsUnzh; ljdkj vkS|ksfxd vf/kdj.k

,oa Je U;k;ky; t;iqj ds iapkV ¼lanHkZ lañ 62@2006½ dks izdkf'kr

djrh gS tks dsUnzh; ljdkj dks 18@09@2015 dks izkIr gqvk FkkA

[lañ ,y & 42011@28@2006&vkbZ vkj ¼Mh;w½]

ihñdsñ os.kqxksiky] MsLd vf/kdkjh

New Delhi, the 29th September, 2015

S.O. 1941.—In pursuance of Section 17 of the Industrial

Disputes Act, 1947 (14 of 1947), the Central Government

hereby publishes the award (I.D. No. 62/2006) of the Central

Government Industrial Tribunal Cum Labour Court, Jaipur

now as shown in the Annexure in the Industrial Dispute

between the employers in relation to the management of

the Doordarshan Kendra and their workman, Which was

received by the Central Government on 18/09/2015.

[No. L-42011/28/2006-IR (DU)]

P.K. VENUGOPAL, Desk Officer

ANNEXURE

CENTRAL GOVERNMENT INDUSTRIAL TRIBUNAL-

CUM-LABOUR COURT, JAIPUR

BHARAT PANDEY

PRESIDING OFFICER

I.D. 62/2006

Reference No. L-42011/28/2006-IR(DU)

Dated: 20.10.2006

Shri Nanak Chand

S/o Shri Nand Ram

1/916, Bhim Basti,

Jhajjar Road, Rewari-123401.

V/s

Director,

Doordarshan Kendra,

Near Jhalana Doongri,

Jaipur-O.

AWARD

4.8.2015

1. The Cental Government in exercise of the powers

conferred under clause (d) of sub-section 1 & 2 (A) of

Section 10 of the Industrial Disputes Act 1947 has referred

the following Industrial dispute to this tribunal for

adjudication:—

‘‘Whether the demand of the All India Trade Union

congress for placing Shri Nanak Chand, Floor

Assistant at serial seven (7) in the seniority list of

Floor Assistants by the Director, doordarshan

Kendra, Jaipur is legal & justified? If yes, to what

relief the workman is entitled to?"

2. According to statement of claim submitted through

General Secretary of the Union applicant Sh. Nanak Chand

had submitted dispute regarding regularisation & seniority

before the CGIT, Jaipur in which award was passed on

10.11.2004 in favour of applicant. It has been further alleged

that the opposite party employer has made Casual Floor

Assistants as permanent whereas applicant being a

temporary floor assistant is entitled to be made permanent

first before the casual floor assistants. Due to non-

compliance of award dated 10.11.2004 whereupon seniority

list was to be amended & due to non-regularisation of the

applicant he again raised dispute before the conciliation

officer which resulted in failure. After receipt of failure report

[Hkkx II—[k.M 3(ii)]

Hkkjr dk jkti= % vDrwcj 10] 2015@vkf'ou 18] 1937

4011

Labour Ministry has made a reference for adjudication as

mentioned above.

3. It has been further alleged that at the time of

commencement of studio of Doordarshan, Jaipur applicant

was appointed after interview & training as floor assistant

on 17.12.1987 against created post of permanent floor

assistants. Annexure-1 to 4 to the statement of claim are

letter for interview, list of successful candidates, information

about training & first payment slip respectively. It has been

accepted by Doordarshan that the applicant worked from

the time of commencement of studio in 1988 till November,

1994 from the time of employment against created posts till

the time of their regularisation. It has been further alleged

by the applicant that he falls within the category of

temporary employee, hence, he is entitled to be regularised

prior to casually employed workmen but casual employees

were made permanent which resulted into injustice to the

applicant because he was entitled to be regularised prior to

the regularisation of casual employees. Further, applicant

has to say that in 1994 permanent posts were filled with a

panel of casual employees & instead of regularising the

applicant temporary work was also seized. At the time of

appointment applicant was qualified & was within the age

group of employment but he has attained the age of 48

years till now & there has been only assurance that he will

be regularised. The applicant was at the serial no. 23

amongst qualified 30 candidates. It has been further alleged

that the opposite party employer vide letter dated 22.7.89

Annex-5 intimated the persons absent that if they want to

work they should contact the office of the employer

otherwise their name shall be struck down from the list.

According to number of available posts at Jaipur

Doordarshan, panel review after every two year & looking

into the un-interestedness of the persons, name of those

employees should have been struck down from the list

who were not taking interest in the work. After completion

of interview & declaration of list for trainees

Sh. Madhusudan Nag at serial no. 2, Ramkaran Meena at

serial no. 6, Sh. Dinesh Singh Rawat at serial no. 8,

Sh. Ramkalyan Meena at serial no. 9, Sh. Ajay Kumar

Sharma at serial no. 10, Sh. Goverdhan Lal Meena at serial

no. 11, Sh. Rajesh Kumar Korapal at serial no. 15, Sh. Indraj

Verma at serial no. 16, Sh. Bhagat Singh at serial no. 19,

Sh. Harischandra Pathak at serial no. 20, name illegible at

serial no. 21 & Sh. Akhilesh Kumar Bhatnagar at serial

no. 22 are such persons who did not require employment

as they had already deserted the workplace earlier. These

persons had not returned back to work even after

proceeding of Pahara 5-A twice. It has been further alleged

that person at serial no. 3 Sh. Ramavatar Gothwal &

Sh. Munnawar Khan at serial no. 4 are working as permanent

employee at Jaipur Kendra. Sh. Mohammad Arif had become

permanent employee at CPC Studio Delhi who died

subsequently it road traffic accident. After removal of

seniority at serial no. 2 to 4, 6, 8, 9, 10, 11, 15 to 16, 20, 21 &

22 the seniority of the applicant comes out to be at serial

no. 7. At the time of filling the post permanently only 14

persons were working wherein the position of the applicant

was at serial no. 7 hence, assesstment by employer of the

position of the applicant at serial no. 7 is wrong &

consequently the prepared list is also wrong. Such list was

not produced by employer before the conciliation officer

& before the CGIT in prolonged litigation.

4. In award dated 10.11.2000 by CGIT, Annex-6 to the

petition, seniority of the applicant shown at serial no. 30

was held to be unbelievable & seniority shown by the

applicant was held to be correct & accordingly it has been

held that benefit to the applicant should be given. At the

time to joining the service applicant was having all the

eligibility for employment including age. The applicant has

worked since creation of the post till the posts were filled

up but the applicant was misguided by the employer on

false assurance of regularisation. The applicant has attained

the age of 48 & unable to bear the cost of litigation beside

other responsibilities. Applicant is unaware as to how long

he has to wait further. He is also unable to engage a counsel,

hence, he has prayed for speedy justice. The applicant has

given consent in writing to employ him as Floor Assistant

at any Doordarshan Kendra of the country or at

Doordarshan Kendra, Jaipur on like post & pay which is

Annex-8 to the statement of claim.

5. The applicant has further alleged that from the facts

narrated above it is clear that according to original seniority

the applicant should have been regularised in the year

1994 & thus he has remained deprived to regularisation. It

has been prayed that applicant be declared regular along

with employees regularised in the year 1994 & consequently

he be awarded with benefits relating to pay, allowances &

annual increments along with compensation on account of

mental pain & cost of litigation.

6. In para wise reply to the statement of claim statement

of para 1, 2, 3, 4, 5, 6, 8, 9 has been alleged to be wrong &

denied. Against para 7 it has been said that statement is

related to the document hence, the statement is undisputed.

In reply to para 7 of the statement of claim it has been

alleged that by working as Floor Assistant on any

Doordarshan Kendra or by working at Jaipur Kendra on

like post with like pay does not confer right of regularisation

in favour of applicant. It has been further alleged that his

regularisation can be considered only on availability of

post under scheme of regularisation.

7. In additional reply it has been alleged in para 4 in

reply to the statement of claim that applicant was engaged

for the work as casual Floor Assistant on contract basis &

he was engaged on the work only for 10 days in a month &

this point has been clearly indicated by this tribunal in

award dated 10.11.2000 while answering issue no. 1. The

applicant has worked between 21.5.88 to 30.7.94 on casual

& rotational basis, hence, statement of the applicant is

4012

THE GAZETTE OF INDIA : OCTOBER 10, 2015/ASVINA 18, 1937

[PART II—SEC. 3(ii)]

wrong & baseless that he was engaged as temporary Floor

Assistant against permanent post of Floor Assistant.

8. It has been further alleged that applicant has worked

between 1988 to 1994 as casual artist on contract basis &

in the above mentioned period according to requirement

he was given work for only 10 days in a month on rotational

basis & the applicant has never worked during above

mentioned period for a period of 120 days. Applicant was

never engaged on temporary basis & he was engaged only

on contract as casual artist according to need. It has been

further alleged that according to scheme of regularisation

dated 9.6.92 applicant is ineligible for regularisation because

he has not worked in any calendar year for 120 days. The

applicant is eligible for regularisation according to scheme

of regularisation dated 17.3.94 but according to seniority

list prepared by non-applicant name of the applicant appears

at serial no. 30, hence, he can be considered for

regularisation only when vacant posts are created. No one

junior to the applicant has ever been regularised till date.

Accordingly, the allegation of the applicant is purely

baseless that he has been kept on assurance since past 12

years. The seniority list for regularisation has been attached

as Ex-R- 1 to the reply.

9. In reply to para 5 of the statement of claim it has been

alleged that whatever fact has been alleged by the applicant

in para 5 to the statement of claim they are related to a list

which was prepared by non-applicant after interview to

engage the artists on contract according to need & this

prepared list after interview has no connection with the list

relating to regularisation. It has been further alleged that

according to scheme of regularisation seniority list of Floor

Assistant & other artists have been prepared by non-

applicant after considering various points of the scheme &

the applicant name falls against serial no. 30 of the list.

Under scheme of regularisation applicant can be considered

for regularisation only according to seniority list as

indicated above & on the availability of the post, as at

present there is no vacant post consideration for

regularisation of the applicant is not possible. It has been

further alleged that it is relevant to make it clear that no

casual artist junior to the applicant has been regularised till

date & the list relating to regularisation & the list relating

to the persons who have qualified in interview are two

different lists.

10. It has been further alleged against para 6 of statement

of claim that in award dated 10.11.2000 decision regarding

seniority of the applicant was not based on merit because

persons from serial no. 7 to 29 were not party to the claim

before the tribunal & it was held by the tribunal that the

applicant could raise the issue of seniority at proper stage.

The applicant has not impleded those persons as party to

the present claim over & above whom he wants to be placed

in seniority list & according to principal of natural justice

those persons are necessary parties to the claim.

11. In reply to para 8 to the statement of claim it has

been alleged that applicant never worked in any calendar

year for 120 days hence, he is not eligible for regularisation

according to scheme of regularisation dated 9.6.92.

According to revised scheme of regularisation dated 17.3.94

on creation of post for regularisation applicant may be

considered according to seniority for regularisation. The

statement of the applicant is wrong that he has worked for

120 days in calendar year ending on 31.3.92. The statement

of claim of the applicant is fit to be rejected on the basis of

reply to the statement of claim.

12. Before the para wise commencement of reply to the

statement of claim three preliminary objections have been

raised by non-applicant which are as under:—

A. There is difference between reliefs claimed by the

applicant in statement of claim & point of reference made

by the Ministry for adjudication. The tribunal is devoid of

jurisdiction, hence, prayer for relief is liable to be rejected.

B. In award dated 17.11.2002 passed by CGIT Cum

Labour Court, Jaipur dispute on the point of seniority of

the applicant was not adjudicated because applicant had

not impleded the persons from serial no. 7 to 29 of the

seniority list. In the present statement of claim also those

persons have not been impleded hence, statement of claim

is liable to be rejected.

C. The applicant had worked on contract basis as casual

Floor Assistant between 1988 to 1994 & he was engaged

according to need for a period of only 10 days in a month.

According to judgement fo Constitution Bench of Hon'bel

Supreme Court in Secretary, State of Karnataka & others

V/s Uma Devi (3) & others, (2006) 4 SCC page 1 applicant

has no right of regularisation. It has been held by Hon'ble

Supreme Court in above judgement that regularisation of

casual & temporary employees is completely against the

provision of Indian Constitution. The view expressed by

Constitution Bench of Hon'ble Supreme Court is as

under:—

"Merely because a temporary employee or a casual

worked continue for a time beyond to term of his

appointment, he would not be entitled to be absorbed

in regular service or made permanent. And further

held that the decisions of the Supreme Court running

counter to or containing directions counter to this

principle will stand denuded of their status as

precedent."

13. The applicant has filed rejoinder on 23.11.10 in which

points raised in statement of claim has been reiterated.

14. After filing of documentary evidence from both the

sides on 13.8.2012 applicant filed his affidavit in evidence

& case was fixed on 31.10.2012 for cross examination of the

applicant by opposite party. For various reasons given in

order-sheets of various dates applicant remained un-cross

examined till 14.7.2015. On 14.7.2015 an application was

[Hkkx II—[k.M 3(ii)]

Hkkjr dk jkti= % vDrwcj 10] 2015@vkf'ou 18] 1937

4013

moved by the applicant in his individual capacity to

withdraw the case but the application of withdrawal was

not moved by General Secretary of the Union who is

applicant in the statement of claim. The applicant moved

application of withdrawal on account of his posting in

Agartala but application of withdrawal did not accompany

the letter appointment. Next date 4.8.2015 was fixed with

direction to file the appointment letter. On 28.7.2015

applicant further moved an application along with

photocopy of offer of appointment dated 21.7.2015 to the

post of Floor Assistant at DDK, Agartala. On 28.7.2015 it

was ordered that application be kept on record to be placed

on 4.8.2015 & copy of the application be given to opposite

party.

15.On 4.8.2015 application was moved for withdrawal

by General Secretary of the Union along with photocopy

of offer of appointment dated 21.7.2015. Both the parties to

the case were heared on application of withdrawal. The

application of withdrawal which has been made part of

award read as under:—

layXud&1

Jheku fizlkbZ¯Mx vkWfQlj

fnukad 04-08-2015

lsUVªy xouZesaUV fVªC;quy&de&yscj dksVZ

lhñthñvksñ dkWEiysDl

10 fo|k/kj uxj&t;iqj&302109

fo"k;% dsl la[;k 62@2006 ukud pUn cuke nwjn'kZu dsUnz

t;iqj o vU; okil ysus gsrqA

lanHkZ%& 14@7@2015 dks fn;s x;s dsl okil ysus gsrq izkFkZuk i= ds

lanHkZ esaA

ekU;oj]

mijksDr lanHkZ esa fuosnu gS fd Jh ukud pUn dks i= Øñ

16@2015@SI )(A) fild No. 31/49/2011-S1A dt. 6/8 May 2015

,oe~ vkns'k lañ 19/2015 S1 (A) of even file dt. 03.06.15 ds

vuqlkj fu;ferdj.k vxjryk nwjn'kZu dsUnz ij fd;k tk jgk gSA

blds lanHkZ esa ukud pUn dks nwjn'kZu dsUnz vxjryk ls vkWQj ysVj

uañ AGT/DDK/1(3)2015-16/6725 fnukad 21.07.2015 dk fey

pqdk gSA ftldh izfr;ka lyaXu gSA

vc pqafd dksbZ okn 'ks"k ugha jg tkrk vr% fu;fefrdj.k ds dsl

dks okil ysrs gSA

Hkonh;

gLrk{kj viBuh;

¼Mhñ dsñ Naxk.kh½

egklfpo

16. Following order was passed on the application of

withdrawal moved by the applicant which reads as under:—

04.08.2015 iqdkj dh x;hA ;kph ukud pUn O;fDrxr :i ls

mifLFkr gSA foi{k dh rjQ ls Jh eqds'k ehuk ,MoksdsV mifLFkr gSA

;kph us vijkUg~ esa 1650 cts vkosnu Jh Mhñ dsñ NxkM+h] egklfoo

,oa vkosnd dh rjQ ls izLrqr dh ftlesa ;kfpdk] tks Jh ukud

pUn dh rjQ ls egklfpo }kjk izLrqr dh x;h gS mls okil ysus dh

izkFkZuk dh x;h gSA vkosnu ds lkFk fu;qfDr&i= dh QksVks izfr layXu

gSA

(A) File No. 31/49/2011-S 1 A fnukafdr 6/8 May 2015 ,oa

vkns'k lañ 19/2015 S 1 (A) of even fild dt. 03.06.15 ds vuqlkj

fu;fefrdj.k vxjryk nwjn'kZu dsUnz ij fd;k tk jgk gSA ftlds

lEcU/k esa ukud pUn dks nwjn'kZu dsUnz vxjryk ls fu;qfDr i=

AGT/DDK/1 (3)/2015-16/6725 fnukad 21.07.2015 dk fey pqdk

gSA ftldh izfr;ka lyaXu gSA ftldh izfr layXu gSA pwfad dksbZ fookn

'ks"k ugha jg x;k gS vr% oknh fu;fefrdj.k dk eqdn~ek okil ysrk

gSA vkosnu ij vkosnd deZdkj rFkk foi{k ds fo}ku izfrfuf/k dks

lqukA foi{k dks eqdn~ek okil ysus esa dksbZ vkifÙk ugha gS vr% ;kph

dh vkosnu Lohdkj gksus ;ksX; gSA

vkns'k

;kph dh vkosnu layXud&1 vukifÙk ds vk/kkj ij Lohdkj dh

tkrh gS rFkk ;kfpdk okil ysus dh vuqefr iznku dh tkrh gSA

;kfpr vuqrks"k vLohdkj fd;s tkrs gSA ;kph iqu% mUghs vk/kkjksa ij

nwljh ;kfpdk ugha izLrqr djsaxsA layXud&1 ,okMZ dk va'k gksxkA

17. From above fact & circumstances, I am of the view

that statement of claim of the apllicant in relation to reference

is fit to be dismissed as withdrawn. The claim petition is

accordingly dismissed as withdran.

18. Award as above.

BHARAT PANDEY, Presiding Officer

ubZ fnYyh] 30 flrEcj] 2015

dk-vk- 1942-—vkS|ksfxd fookn vf/kfu;e 1947 ¼1947 dk

14½ dh /kkjk 17 ds vuqlj.k esa dsUnzh; ljdkj fnYyh fodkl vFkkWfjVh

vkSj nwljksa ds izca/kr= ds lac) fu;kstdks vkSj muds deZdkjksa ds

chp vuqca/k esa fufnZ"V vkS|ksfxd fookn esa dsUnzh; ljdkj vkS|ksfxd

vf/kdj.k ,oa Je U;k;ky; 1 fnYyh ds iapkV ¼lanHkZ lañ 43@2015½

dks izdkf'kr djrh gS tks dsUnzh; ljdkj dks 29@09@2015 dks izkIr

gqvk FkkA

[lañ ,y&42012@188@2014&vkbZ vkj ¼Mh;w½]

ihñdsñ os.kqxksiky] MsLd vf/kdkjh

New Delhi, the 30th September, 2015

S.O. 1942.—In pursuance of Section 17 of the Industrial

Disputes Act, 1947 (14 of 1947), the Central Government

hereby publishes the award (I.D. No. 43/2015) of the Central

Government Industrial Tribunal Cum labour Court No. 1,

Delhi now as shown in the Annexure in the Industrial

Dispute between the employers in relation to the

4014

THE GAZETTE OF INDIA : OCTOBER 10, 2015/ASVINA 18, 1937

[PART II—SEC. 3(ii)]

management of the Delhi Development Authority & others

and their workman, which was received by the Central

Government on 29/09/2015.

[No. L-42012/188/2014-IR(DU)]

P.K. VENUGOPAL, Desk Officer

ANNEXURE

IN THE COURT OF SHRI AVTAR CHAND DOGRA,

PRESIDING OFFICER, CENTRAL GOVERNMENT

INDUSTRIAL TRIBUNAL COM-LABOUR-COURT

NO. 1, KARKARDOOMA COURT

COMPLEX, DELHI

ID No. 43/2015

Shri Dinesh Kumar

S/o Mewa Lal Gupta,

C/o 1800/9, Govindpuri Extension,

Main Road, Kalkaji,

New Delhi 11 0049

...Workman

Versus

1. The Secretary,

Delhi Development Authority,

Siri Fort Sports Complex,

August Kranti Marg,

Khel Gaon,

New Delhi 110 049

2. M/s. Niti Enterprises,

L-88, Kisan Vihar,

New Delhi 110 041

...Managements

AWARD

Central Government, vide letter No. L-42012/188/2014-

IR(DU) dated 12.01.2015, referred the following industrial

dispute to this Tribunal for adjudication:

''Whether the action of the management of NITI

Enterprises, Contractor, in terminating the services

of the workman, Shri Dinesh Kumar, with effect from

01.05.2015 can be construed as termination of

employment by DDA presuming the entity of

contractor as sham and camouflage? If not, with relief

the workman concerned in entitled to?’’

2. In the reference order, the appropriate Government

commanded the parties to the dispute to file statement of

claim, complete with relevant documents, list of reliance

and witnesses with this Tribunal within 15 days of receipt

of the reference order and to forward a copy of such

statement of claim to the opposite parties involved in the

dispute.Despite directions, so given, Shri Dinesh Kumar

opted not to file his claim statement with the Tribunal.

3. On receipt of the above reference, notice was sent to

the workman as well as the management. Neither the postal

article, referred above, was received back nor was it observed

by the Tribunal that postal services remained affected in

the period, referred above. Therefore, every presumption

lies, in favour of the fact that the above notice was served

upon the claimant. Despite service of the notice, claimant

opted to abstain away from the proceedings. No claim

statement was filed on his behalf. Thus, it is clear that the

workman is not interested in adjudication of the reference

on merits.

4. Since the workman has neither put in his appearance

nor has he led any evidence so as to prove his cause against

the management, as such, this Tribunal is left with no

choice, except to pass a 'No Dispute/Claim' award.

Dated: August 21, 2015

A.C. DOGRA, Presiding Officer

ubZ fnYYkh] 30 flrEcj] 2015

dk-vk- 1943-—vkS|ksfxd fookn vf/kfu;e 1947 ¼1947 dk

14½ dh /kkjk 17 ds vuqlj.k ds dsUnzh; ljdkj fnYYkh fodkl

vFkkWfjVh vkSj nwljksa ds izca/kr= ds lac) fu;kstdksa vkSj muds deZdkjksa

ds chp vuqca/k esa fufnZ"V vkS|ksfxd fookn esa dsUnzh; ljdkj vkS|ksfxd

vf/kdj.k ,oa Je U;k;ky;&1 fnYyh ds iapkV ¼lanHkZ lañ 44@2015½

dks izdkf'kr djrh gS tks dsUnzh; ljdkj dks 29@09@2015 dks izkIr

gqvk FkkA

[lañ ,y&42012@189@2014 vkbZvkj ¼Mh;w½]

ihñdsñ os.kqxksiky] MsLd vf/kdkjh

New Delhi, the 30th September, 2015

S.O. 1943.—In pursuance of Section 17 of the Industrial

Disputes Act, 1947 (14 of 1947), the Central Government

hereby publishes the award (I.D. No. 44/2015) of the Central

Government Industrial Tribunal Cum Labour Court No. 1,

Delhi now as shown in the Annexure in the Industrial

Dispute between the employers in relation to the

management of the Delhi Development Authority & others

and their workman, which was received by the Central

Government on 29/09/2015.

[No. L-42012/189/2014-IR(DU)]

P.K. VENUGOPAL, Desk Officer

ANNEXURE

IN THE COURT OF SHRI AVTAR CHAND DOGRA,

PRESIDING OFFICER, CENTRAL GOVERNMENT

INDUSTRIAL TRIBUNAL-COM-LABOUR

COURT NO. 1, KARKARDOOMA

COURT COMPLEX, DELHI

ID No. 44/2015

Shri Vir Pal,

S/o Shri Gopi Ram,

C/o 1800/9, Govindpuri Extension,

Main Road, Kalkaji,

New Delhi 11 0019

...Workman

[Hkkx II—[k.M 3(ii)]

Hkkjr dk jkti= % vDrwcj 10] 2015@vkf'ou 18] 1937

4015

Versus

1. The Secretary,

Delhi Development Authority,

Siri Fort Sports Complex,

August Kranti Marg,

Khel Gaon,

New Delhi 110 049

2. M/s. Deepali (India) Enterprises

178, Block 14, Ground Floor,

L.B.S. Hospital, Khichripur,

New Delhi 110 019

........Managements

AWARD

Central Government, vide letter No. L-42012/189/2014-

IR(DU) dated 12.01.2015, referred the following industrial

dispute to this Tribunal for adjudication:

''Whether the action of the management of NITI

Enterprises, Contractor, in terminating the services

of the workman, Shri Bajrang Bahadur Singh, with

effect from 16.07.2013 can be construed as

termination of employment by DDA presuming the

entity of contractor as sham and camouflage? If not,

with relief the workman concerned in entitled to?"

2. In the reference order, the appropriate Government

commanded the parties to the dispute to file statement of

claim, complete with relevant documents, list of reliance

and witnesses with this Tribunal within 15 days of receipt

of the reference order and to forward a copy of such

statement of claim to the opposite parties involved in the

dispute. Despite directions so given, Shri Vir Pal opted not

to file his claim statement with the Tribunal.

3. On receipt of the above reference, notice was sent to

the workman as well as the management. Neither the postal

article, referred above, was received back nor was it observed

by the Tribunal that postal services remained affected in

the period, referred above. Therefore, every presumption

lies, in favour of the fact that the above notice was served

upon the claimant. Despite service of the notice, claimant

opted to abstain away from the proceedings. No claim

statement was filed on his behalf. Thus, it is clear that the

workman is not interested in adjudication of the reference

on merits.

4. Since the workman has neither put in his appearance

nor has he led any evidence so as to prove his cause against

the management, as such, this Tribunal is left with no

choice, except to pass a 'No Dispute/Claim' award.

Dated: August 21, 2015

A.C. DOGRA, Presiding Officer

ubZ fnYYkh] 30 flrEcj] 2015

dk-vk- 1944-—vkS|ksfxd fookn vf/kfu;e] 1947 ¼1947

dk 14½ dh /kkjk 17 ds vuqlj.k eas dsUnzh; ljdkj fnYYkh fodkl

vFkkWfjVh vkSj nwljksa ds izca/kra= ds lac) fu;kstdksa vkSj muds deZdkjksa

ds chp vuqca/k esa fufnZ"V vkS|ksfxd fookn esa dsUnzh; ljdkj vkS|ksfxd

vf/kdj.k ,oa Je U;k;ky;&1] fnYyh ds iapkV ¼lanHkZ lañ 46@2015½

dks izdkf'kr djrh gS] tks dsUnzh; ljdkj dks 29&09&2015 dks izkIr

gqvk FkkA

[lañ ,y&42012@191@2014&vkbZvkj ¼Mh;w½]

ihñ dsñ os.kqxksiky] MsLd vf/kdkjh

New Delhi, the 30th September, 2015

S.O. 1944.—In pursuance of Section 17 of the Industrial

Disputes Act, 1947 (14 of 1947), the Central Government

hereby publishes the award (I.D. No. 46/2015) of the Central

Government Industrial Tribunal-Com-Labour Court No. 1,

Delhi now as shown in the Annexure in the Industrial

Dispute between the employers in relation to the

management of the Delhi Development Authority & others

and their workman, which was received by the Central

Government on 29-09-2015.

[No. L-42012/191/2014-IR(DU)]

P.K. VENUGOPAL, Desk Officer

ANNEXURE

IN THE COURT OF SHRI AVTAR CHAND DOGRA,

PRESIDING OFFICER, CENTRAL GOVERNMENT

INDUSTRIAL TRIBUNAL-CUM-LABOUR

COURT NO. 1, KARKARDOOMA COURT

COMPLEX, DELHI

ID No. 46/2015

Shri Bindeshwari Prasad,

S/o Shri Ram Prakash,

C/o 1800/9, Govindpuri Extension,

Main Road, Kalkaji,

New Delhi-110019

....Workman

Versus

1. The Secretary,

Delhi Development Authority

Shri Fort Sports Complex,

August Kranti Marg,

Khel Gaon,

New Delhi 110049

2. M/s. Niti Enterprises

L-88, Kisan Vihar,

New Delhi 110 041

...Managements

AWARD

Central Government, vide letter No. L-42012/191/2014-

IR(DU) dated 12.01.2015, referred the following industrial

dispute to this Tribunal for adjudication:

"Whether the action of the management of NITI

Enterprises, Contractor, in terminating the services

of the workman, Shri Bindeshwari Prasad, with effect

4016

THE GAZETTE OF INDIA : OCTOBER 10, 2015/ASVINA 18, 1937

[PART II—SEC. 3(ii)]

from 01.05.2013 can be construed as termination of

employment by DDA presuming the entity of

contractor as sham and comouflage? If not, what

relief the workman concerned is entitled to?"

2. In the reference order, the appropriate Government

commanded the parties to the dispute to file statement of

claim, complete with relevant documents, list of reliance

and witnesses with this Tribunal within 15 days of receipt

of the reference order and to forward a copy of such

statement of claim to the opposite parties involved in the

dispute. Despite directions so given, Shri Bindeshwari

Prasad opted not to file his claim statement with the

Tribunal.

3. On receipt of the above reference, notice was sent to

the workman as well as the management. Neither the postal

article, referred above, was received back nor was it observed

by the Tribunal that postal services remained affected in

the period, referred above. Therefore, every presumption

lies in favour of the fact that the above notice was served

upon the claimant. Despite services of the notice, claimant

opted to abstain away from the proceedings. No claim

statement was filed on his behalf. Thus, it is clear that the

workman is not interested in adjudtication of the reference

on merits.

4. Since the workman has neither put in his appearance

nor has he led any evidence so as to prove his cause against

the management, as such, this Tribunal is left with no

choice, except to pass a 'No Dispute/Claim' award.

A. C. DOGRA, Presiding Officer

Dated : August 21st, 2015

ubZ fnYyh] 30 flrEcj] 2015

dk-vk- 1945-—vkS|ksfxd fookn vf/kfu;e 1947 ¼1947 dk

14½ dh /kkjk 17 ds vuqlj.k esa dsUnzh; ljdkj fnYyh fodkl vFkkWfjVh

vkSj nwljksa ds izca/kra= ds lac) fu;kstdksa vkSj muds deZdkjksas ds

chp vuqca/k esa fufnZ"V fookn esa dsUnzh; ljdkj vkS|ksfxd

vf/kdj.k ,oa Je U;k;ky; fnYyh ds iapkV ¼lanHkZ lañ 47@2015½

dks izdkf'kr djrh gS tks dsUnzh; ljdkj dks 29@09@2015 dks izkIr

gqvk FkkA

[lañ ,y&42012@192@2014&vkbZvkj ¼Mh;w½]

ih- ds- os.kqxksiky] MsLd vf/kdkjh

New Delhi, the 30th September, 2015

S.O. 1945.—In pursuance of Section 17 of the Industrial

Disputes Act, 1947 (14 of 1947), the Central Government

hereby publishes the award (I.D. No. 47/2015) of the Central

Government Industrial Tribunal Cum Labour Court No. 1,

Delhi now as shown in the Annexure in the Industrial

Dispute between the employers in relation to the

management of the Delhi Development Authority & Others

and their workman, which was received by the Central

Government on 29-09-2015.

[No. L-42012/192/2014-IR(DU)]

P.K. VENUGOPAL, Desk Officer

ANNEXURE

IN THE COURT OF SHRI AVTAR CHAND DOGRA,

PRESIDING OFFICER, CENTRAL GOVERNMENT

INDUSTRIAL TRIBUNAL-CUM-LABOUR

COURT NO. 1, KARKARDOOMA COURT

COMPLEX, DELHI

ID No. 47/2015

Shri Bhagirath,

S/o Shri Shyam Lal,

C/o 1800/9, Govindpuri Extension,

Main Road, Kalkaji,

New Delhi-110019

....Workman

Versus

1. The Secretary,

Delhi Development Authority

Shri Fort Sports Complex,

August Kranti Marg,

Khel Gaon,

New Delhi 110049

2. M/s. NITI Enterprises

L-88, Kisan Vihar,

New Delhi 110041

...Managements

AWARD

Central Government, vide letter No. L-42012/192/2014-

IR(DU) dated 12.01.2015, referred the following industrial

dispute to this Tribunal for adjudication:

"Whether the action of the management of NITI

Enterprises, Contractor, in terminating the services

of the workman, Shri Bajrang Bahadur Singh, with

effect from 01.05.2013 can be construed as

termination of employment by DDA presuming the

entity of contractor as sham and camouflage? If not,

what relief the workman concerned is entitled to?"

2. In the reference order, the appropriate Government

commanded the parties to the dispute to file statement of

claim, complete with relevant documents, list of reliance

and witnesses with this Tribunal within 15 days of receipt

of the reference order and to forward a copy of such

statement of claim to the opposite parties involved in the

dispute. Despite directions so given, Shri Bhagirath opted

not to file his claim statement with the Tribunal.

3. On receipt of the above reference, notice was sent to

the workman as well as the management. Neither the postal

[Hkkx II—[k.M 3(ii)]

Hkkjr dk jkti= % vDrwcj 10] 2015@vkf'ou 18] 1937

4017

article, referred above, was received back nor was it observed

by the Tribunal that postal services remained affected in

the period, referred above. Therefore, every presumption

lies in favour of the fact that the above notice was served

upon the claimant. Despite services of the notice, claimant

opted to abstain away from the proeedings. No claim

statement was filed on his behalf. Thus, it is clear that the

workman is not interested in adjudtication of the reference

on merits.

4. Since the workman has neither put in his appearance

nor has he led any evidence so as to prove his cause against

the management, as such, this Tribunal is left with no

choice, except to pass a 'No Dispute/Claim' award.

Dated: August 21st, 2015

A.C. DOGRA, Presiding Officer

ubZ fnYyh] 30 flrEcj] 2015

dk-vk- 1946-—vkS|ksfxd fookn vf/kfu;e 1947 ¼1947 dk

14½ dh /kkjk 17 ds vuqlj.k esa dsUæh; ljdkj fnYyh fodkl vFkkWfjVh

vkSj nwljksa ds izca/kra= ds laca) fu;kstdksa vkSj muds deZdkjksa ds

chp vuqca/k esa fufnZ"V vkS|ksfxd fookn esa dsUæh; ljdkj vkS|ksfxd

vf/kdj.k ,oa Je U;k;ky;&1 fnYyh ds iapkV ¼lanHkZ lañ 48@2015½

dks izdkf'kr djrh gS tks dsUæh; ljdkj dks 29&09&2015 dks izkIr

gqvk FkkA

[lañ ,y&42012@193@2014&vkbZ vkj¼Mh;w½]

ihñ dsñ os.kqxksiky] MsLd vf/kdkjh

New Delhi, the 30th September, 2015

S.O. 1946.—In pursuance of Section 17 of the Industrial

Disputes Act, 1947 (14 of 1947), the Central Government

hereby publishes the award (I.D. No. 48/2015) of the Central

Government Industrial Tribunal Cum Labour Court No. 1,

Delhi now as shown in the Annexure in the Industrial

Dispute between the employers in relation to the

management of the Delhi Development Authority & others

and their workman, which was received by the Central

Government on 29.09.2015.

[No. L-42012/193/2014-IR(DU)]

P. K. VENUGOPAL, Desk Officer

ANNEXURE

IN THE COURT OF SHRI AVTAR CHAND DOGRA,

PRESIDING OFFICER, CENTRAL GOVERNMENT

INDUSTRIAL TRIBUNAL-CUM-LABOUR

COURT NO. 1, KARKARDOOMA COURT

COMPLEX, DELHI

ID No. 48/2015

Shri Bajrang Bahadur Singh,

S/o Shri Kalaka Baks,

C/o 1800/9, Govindpuri Extension,

Main Road, Kalkaji,

New Delhi 110019

..... Workman

Versus

1. The Secretary,

Delhi Development Authority

Siri Fort Sports Complex,

August Kranti Marg,

Khel Gaon,

New Delhi 110 049

2. M/s. Niti Enterprises,

L-88, Kisan Vihar,

New Delhi-110 041

.... Managements

AWARD

Central Government, vide letter No. L-42012/193/2014-

IR(DU) dated 12-01-2015, referred the following industrial

dispute to this Tribunal for adjudication:

"Whether the action of the management of NITI

Enterprises, Contractor, in terminating the services

of the workman, Shri Bajrang Bahadur Singh, with

effect from 01.03.2013 can be construed as

termination of employment by DDA presuming the

entity of contractor as sham and camouflage? If not,

what relief the workman concerned is entitled to?"

2. In the reference order, the appropriate Government

commanded the parties to the dispute to file statement of

claim, complete with relevant documents, list of reliance

and witnesses with this Tribunal within 15 days of receipt

of the reference order and to forward a copy of such

statement of claim to the opposite parties involved in the

dispute. Despite directions so given, Shri Bajrang Bahadur

Singh opted not to file his claim statement with the Tribunal.

3. On receipt of the above reference, notice was sent to

the workman as well as the management. Neither the postal

article, referred above, was received back nor was it observed

by the Tribunal that postal services remained affected in

the period, referred above. Therefore, every presumption

lies in favour of the fact that the above notice was served

upon the claimant. Despite service of the notice, claimant

opted to abstain away from the proceedings. No claim

statement was filed on his behalf. Thus, it is clear that the

workman is not interested in adjudication of the reference

on merits.

4. Since the workman has neither put in his appearance

nor has he led any evidence so as to prove his cause against

the management, as such, this Tribunal is left with no

choice, except to pass a 'No dispute/Claim' Award.

A.C. DOGRA, Presiding Officer

Dated: August 21st, 2015

4018

THE GAZETTE OF INDIA : OCTOBER 10, 2015/ASVINA 18, 1937

[PART II—SEC. 3(ii)]

ubZ fnYyh] 30 flrEcj] 2015

dk-vk- 1947-—jk"Vªifr] Jh jatu dqekj lju] ihBklhu vf/

kdkjh] dsUæh; ljdkj vkS|ksfxd vf/kdj.k&lg&Je U;k;ky;] /

kuckn&I dks Ng ekg dh vof/k vFkok fu;fer vk/kkj ij bl in ds

Hkjs tkus rd buesa tks Hkh igys gks] dsUæh; ljdkj vkS|ksfxd vf/

kdj.k&lg&Je U;k;ky;] /kuckn&II ds ihBklhu vf/kdkjh dk

vfrfjDr izHkkj lkSairs gSaA

[lañ ,&11016@03@2009&lh,y,l&II]

,lñdsñ flag] voj lfpo

New Delhi, the 30th September, 2015

S.O. 1947.—The President is pleased to entrust the

additional charge of the post of the Presiding Officer of

the Central Government Industrial Tribunal-cum-Labour

Court, Dhanbad-II to Shri Ranjan Kumar Saran, Presiding

Officer, Central Government Industrial Tribunal-cum-

Labour Court, Dhanbad-I for a period of three months or

till the post is filled on regular basis, whichever is earlier.

[No. A-11016/03/2009-CLS-II]

S.K. SINGH, Under Secy.

ubZ fnYyh] 1 vDrwcj] 2015

dk-vk- 1948-—vkS|ksfxd fookn vfèfu;e 1947 ¼1947 dk

14½ dh èkjk 17 ds vuqlj.k esa dsUnzh; ljdkj Hkkjr lapkj fuxe

fyfeVsM] rfeyukMq ds izcaèra= ds lac) fu;kstdksa vkSj muds deZdkjksa

ds chp vuqcaè esa fufnZ"V vkS|ksfxd fookn esa dsUnzh; ljdkj vkS|ksfxd

vfèdj.k ,o Je U;k;ky; psUubZ ds iapkV ¼lanHkZ lañ 42@2005½

dks izdkf'kr djrh gS tks dsUnzh; ljdkj dks 01&10&2015 dks izkIr

gqvk FkkA

[ lañ ,y&40011@1@2005&vkbZ vkj ¼Mh ;w½]

ihñ dsñ os.kqxksiky] MsLd vfèdkjh

New Delhi, the 1st October, 2015

S.O. 1948.—In pursuance of Section 17 of the Industrial

Disputes Act, 1947 (14 of 1947), the Central Government

hereby publishes the award (I.D. No. 42/2005) of the Central

Government Industrial Tribunal-cum-Labour Court Chennai

now as shown in the Annexure in the Industrial Dispute

between the employers in relation to the management of

the Bharat Sanchar Nigam Limited, Tamil Nadu and their

workmen, which was received by the Central Government

on 01-10-2015.

[No.L-40011/1/2005-IR(DU)]

P. K. VENUGOPAL, Desk Officer

ANNEXURE

BEFORE THE CENTRAL GOVERNMENT

INDUSTRIAL TRIBUNAL-CUM-LABOUR

COURT CHENNAI

Monday, the 14th September, 2015

Present:

K.P. PRASANNA KUMARI,

Presiding Officer

Industrial Dispute No. 42/2005

(In the matter of the dispute for adjudication under

clause (d) of sub-section (1) and sub-section 2(A) of Section

10 of the Industrial Disputes Act, 1947 (14 of 1947), between

the Management of Bharat Sanchar Nigam Ltd., Tamil Nadu

Telecom Circle, Chennai and their workman)

BETWEEN

The Circle Secretary

:

1st Party/Petitioner Union

BSNL Employees Union

No. 3/71, 4th Street, Raghava Nagar

Madipakkam

Chennai-600091

AND

1.

The Chief General Manager

:

2nd Party/1st

BSNL, Tamil Nadu Telecom Circle

Respondent

Annasalai

Chennai-600002

2.

The Principal

:

2nd Party/2nd

RGM-CTTC, Meenambakkam

Respondent

Chennai-600002

3.

The Chairman & Managing

:

2nd Party/3rd

Director BSNL, Sanchar Bhawan

Respondent

New Delhi-110001

Appearance:

For the 1st Party/

:

M/s K.M. Ramesh, Advocates

Petitioner Union

For the 2nd Party/

:

Shri D. Simon, Advocate

1st, 2nd & 3rd

Respondent

AWARD

The Central Government, Ministry of Labour and

Employment vide its Order No. L-40011/1/2005-IR (DU)

dated 09.05.2005 referred the followng Industrial Dispute

to this Tribunal for adjudication.

The Schedule mentioned in that order is:

"Whether the action of the management of Telecom

Department, BSNL, Chennai in non-regularizing/

absorbing the services of the contract labourers

numbering three i.e. Smt. Paulsoundaram, M. Sundari

and S. Devi is legal and justified? If not, to what relief

the workman/contract labourers are entitled to?"

2. On receipt of the Industrial Dispute this Tribunal has

numbered it as ID 42/2005 and issued notices to both sides.

Both sides have entered appearance through their counsel

and filed Claim and Counter Statement respectively.

[Hkkx II—[k.M 3(ii)]

Hkkjr dk jkti= % vDrwcj 10] 2015@vkf'ou 18] 1937

4019

3. The dispute has been pending before this Tribunal

for a long time. After stay in the matter has been removed it

was posted for evidence repeatedly. However, the petitioner

has not come forward to tender evidence to substantiate

the case. So far no documents have been produced in

support of the case also. The petitioner seems to be not

interested in pursuing the case. In the absence of any matter

the reference is only to be answered against the petitioner.

Therefore the reference is answered against the

petitioner. An award is passed accordingly.

K.P. PRASANNA KUMARI, Presiding Officer

Witnesses Examined:

For the 1st Party/Petitioner

:

None

For the 2nd Party/Management

:

None

Documents Marked:

On the petitioner's side

Ex. No.

Date

Description

Nil

On the Management's side

Ex. No.

Date

Description

Nil

ubZ fnYyh] 1 vDrwcj] 2015

dk-vk- 1949-—vkS|ksfxd fookn vfèfu;e 1947 ¼1947 dk

14½ dh èkjk 17 ds vuqlj.k esa dsUnzh; ljdkj fMikVZesaV vkWQ+ iksLV]

paMhx<+ ds izcaèra= ds lac) fu;kstdksa vkSj muds deZdkjksa ds chp

vuqcaè esa fufnZ"V vkS|ksfxd fookn esa dsUnzh; ljdkj vkS|ksfxd

vfèdj.k ,oa Je U;k;ky; lañ 1] paMhx<+ ds iapkV ¼lanHkZ lañ

11@2011½ dks izdkf'kr djrh gS tks dsUnzh; ljdkj dks 30@09@2015

dks izkIr gqvk FkkA

[ lañ ,y&40011@4@2011&vkbZ vkj ¼Mh ;w½]

ihñdsñ os.kqxksiky] MsLd vfèdkjh

New Delhi, the 1st October, 2015

S.O. 1949.—In pursuance of Section 17 of the Industrial

Disputes Act, 1947 (14 of 1947), the Central Government

hereby publishes the award (I.D. No. 11/2011) of the Central

Government Industrial Tribunal-Cum-Labour Court No. 1,

Chandigarh now as shown in the Annexure in the Industrial

Dispute between the employers in relation to the

management of the Department of Post, Chandigarh and

their workmen, which was received by the Central

Government on 30/09/2015.

[No.L-40011/4/2011-IR(DU)]

P.K. VENUGOPAL, Desk Officer

ANNEXURE

BEFORE SHRI SURENDRA PRAKASH SINGH,

PRESIDING OFFICER, CENTRAL GOVT.

INDUSTRIAL TRIBUNAL-CUM-LABOUR

COURT-I, CHANDIGARH

Case No. ID 11/2011. Reference No. L-40011/4/2011-IR(DU)

dated 11.05.2011

Shri Surinder Pal Singh son of Shri Karam Chand C/O Shri

R.K. Singh Parmar working

President Pb. INTUC, 211-LBrari, PO Partap Nagar, Nangal

Dam, Ropar.

...Workman

Versus

1. The Senior Superintendent of Post Offices,

Department of Post, GPO, Sector-17, Chandigarh.

...Respondent

Appearance

For the workman

: Shri R.K. Singh

For the management

: Shri Vikram Bajaj Advocate.

AWARD

Passed on 23.09.2015

Government of India Ministry of Labour vide notification

No.L-40011/4/2011-IR (DU) dated 11.05.2011 has referred

the following dispute to this Tribunal for adjudication:

"Whether the demand of Shri Surinder Pal Singh, Ex-

BPM(GDS) at Mukari, Tehsil Anandpur Sahib, District

Ropar, against the management of Sr. Supdt. of Post

Offices, Sector-17D, Chandigarh for reinstatement in

service w.e.f. 30.06.2010 with continuity of service

with full back wages is legal and justified? What

benefits the workman is entitled for and what

directions are necessasry in the matter?"

2. The workman filed claim statement in which it is

pleaded that he was employed as BPM(GDS) at Village and

PO Mukeri, District Ropar w.e.f. 18.8.2006 and was

continuously employed as such till 30.6.2010 and before

joining the present service he was working for his father as

BPM for the last about three years. And he was paid wages

in the pay scale of Rs.2745/- and on the date of termination

drawing Rs.4000/- per month. It is further pleaded that on

1.7.2010 he was suddenly relieved from his duty by taking

charge. There was no complaint against his work and

conduct. It is pleaded that his termination from service

w.e.f. 30.6.2010 is illegal in as much as he was not served

with one month notice nor paid pay for one month in lieu of

notice and not paid any retrenchment compensation which

is pre condition to the termination. The management

violated the provision of Section 25F of the I.D. Act, 1947.

4020

THE GAZETTE OF INDIA : OCTOBER 10, 2015/ASVINA 18, 1937

[PART II—SEC. 3(ii)]

It is prayed that the workman may be reinstead in service

with full back wages with all other attendant benefits.

3. The management filed written statement in preliminary

objection has been taken that the workman had already

availed his remedies twice before the Central Administrative

Tribunal by way of filing OA1993/PB/2008 seeking

quashing of order dated 23.4.2008 under which his

appointment on compassionate ground was rejected. His

second OA was also dismissed; therefore, the workman

cannot agitate his claims before this Labour Court. On merits

it is pleaded that on the death of Shri Karam Chand as a

stop gap arrangement the charge of Mukari BO was handed

over to Surinder Pal who is the son of the deceased Karam

Chand purely on temporary basis till appointment of regular

BPM with the condition that he will not claim any right on

the post. In order to fill up the post a proposal was sent to

the CPMG and the approval was accorded on 22.9.2006.

The workman also applied for the appointment on

compassionate ground and since it has to take some time,

therefore, the process to fill up the post was initiated and

the post was notified for SC category on 5.2.2007. The

workman had not applied against this post. The workman

was engaged on this post in place of his father till the

regular incumbent is recruited on the post. The workman

itself has not availed the remedies of competing with others

for recruitment which was from the open market and has

been awaiting for his compassionate appointment which

was ultimately rejected. The work has been assigned to

regular incumbent and there is no other post available.

Thus the disengagement of the workman is legal, valid and

according to the conditions of his employment and

therefore, the workman is not entitled for any claim and the

reference deserves rejection.

4. The workman is evidence filed his own affidavit as Ex.

W1. In rebuttal the management filed affidavit of Mr. P.D.S.

Thakur as Ex. M1 who also relied on documents Ex. M2 to

Ex. M5. The workman in his statement before this Tribunal

admitted that the charge of Mukari BO was handed over to

him on 19.8.2006 purely on temporary basis till the

appointment of regular BPM. It is also admitted by the

workman in his cross-examination that he applied on

compassionate ground and his case was finally rejected

on 13.3.2008 and on his filing a case before the CAT, the

CAT ordered for reconsideration but his case was

reconsidered and rejected on 23.7.2009. It is further admitted

by the workman that he again moved to CAT but his second

OA was also rejected by CAT on 4.8.2009. It is also admitted

by the workman that Shri Mandip Singh son of Shri Sarwan

Singh was appointed as GDSBPM Mukari BO and he was

relieved on 30.6.2010. MW1 Shri P.D.S. Thakur in his

statement before his Tribunal admitted that on notice was

given to the workman nor any compensation was given.

Workman himself has submitted a undertaking.

5. I have heard the parties, gone through the evidence

and record.

6. It is submitted by the learned rep. of the workman

during arguments that the workman served with the

department from 19.8.2006 to 30.6.2010 for about four years.

He was given the charge of the post in place of his father.

The services of the workman were terminated on 30.6.2010

without payment of one month pay in lieu of notice and

without payment of any retrenchment compensation which

is in violation of the provisions of Section 25F of the

Industrial Disputes Act 1947 and the workman are entitled

for reinstatement with back wages. On the other hand the

learned cousel for the management submitted during

arguments that the workman was given the charge on stop

gap arrangement on the death of his father on the clear

understanding that on joining of regular candidate, the

workman has to go. The workman also lost twice his case

for compassionate appointment before the Central

Administrative Tribunal and joining of regular candidate

Shri Mandip Singh, the services of the workman were

disengaged. The disengagement of the workman is in

accordance with his undertaking given by him at the time

of joining. Therefore, there is no violation of Section 25F of

the Industrial Disputes Act 1947 and the workman is not

entitled to any relief.

7. So far as the status of the workman on the post is

concerned, it is clear from the evidence and admission of

the workman himself that he was engaged on temporary

basis on 19.8.2006. Thereafter regular incumbent was

appointed on the post following the recruitment rules as

applicable. The workman applied for considering on

compassionate ground. His case was sent to the Circle

Officer but his case was rejected. The workman challenged

this order before the Central Administrative Tribunal,

Chandigarh bench. The CAT, Chandigarh ordered for

reconsideration of his case. The case of the workman was

again rejected by the Circle Office against which the

workman filed second original application before the CAT,

Chandigarh. This second OA was again rejected by the

CAT, Chandigarh. The management submitted that

workman was engaged purely on temporary basis as stop

gap arrangement. The management cited 1997(1) S.L.R. page

135 Union of India and other Vs. Bishamber Dutt. The

management also cited 2007(1) All India Service Law Journal

page 151 National Fertilizers Ltd. and Ors. Vs. Som Vir Singh.

Another judgment 2009(3) All India Service Law Journal

page 93 of the Hon'ble Supreme Court also cited by the

management. In these case laws the Hon'ble Supreme Court

has held that a person engaged without following the

recruitment procedure is not entitled for regularization. If it

is done, that would be back door entry and such

regularization would be illegal. Thus in view of the above

the reinstatement of the workman can not be ordered as he

was engaged on the post without following the recruitment

procedure. Moreover the person who was appointed after

following the recruitment procedure also joined on the post.

[Hkkx II—[k.M 3(ii)]

Hkkjr dk jkti= % vDrwcj 10] 2015@vkf'ou 18] 1937

4021

8. On behalf of the workman it is submitted that he was

engaged on 19.8.2006 and worked till 30.6.2010. The

workman in his claim statement nowhere stated that he

worked for 240 days in preceding year to the date of his

disengagement. The management in its written statement

clearly mentioned in para No. 5 that "the claimant has not

given the details of days of his working. It is denied that he

has worked continuously as alleged".. the management

filed the affidavit of Shri P.D.S. Thakur Sr. Supdt. of Post

Offices, Chandigarh. In the affidavit the management's

witness substantiate the allegation made in the written

statement and it is clearly mentioned in para No. 5 of the

affidavit that the claimant has not given the details of days

of his working and it is denied that he has worked

continuously as alleged.

9. Form the above discussion, it is clear that workman

was engaged purely on temporary basis as stop gap

arrangement and not as per recruitment procedure and the

regular incumbent who was selected after following the

recruitment procedure has joined the post. The workman

also failed to prove any violation of Section 25F of the I.D.

Act. Therefore, the workman is not entitled to any relief.

10. The reference is answered accordingly. Central Govt.

be informed.

Chandigarh.

23.09.2015

S.P. SINGH, Presiding Officer

ubZ fnYyh] 1 vDrwcj] 2015

dk-vk- 1950-—vkS|ksfxd fookn vf/kfu;e] 1947 ¼1947

dk 14½ dh /kkjk 17 ds vuqlj.k esa] dsUnzh; ljdkj bZlh,y ds

izca/kra= ds lac) fu;kstdksa vkSj muds deZdkjksa ds chp] vuqca/k esa

fufnZ"V vkS|ksfxd fookn esa dsUnzh; ljdkj vkS|ksfxd

vf/kdj.k@Je U;k;ky;] vklulksy ds iapkV lanHkZ la[;k 23@2006

dks izdkf'kr djrh gS] tks dsUnzh; ljdkj dks 01@10@2015 dks izkIr

gqvk FkkA

[lañ ,y&22012@129@2005&vkbZvkj ¼lh&2½]

jktsUnz flag] vuqHkkx vf/kdkjh

New Delhi, the 1st October, 2015

S.O. 1950.—In pursuance of Section 17 of the Industrial

Disputes Act, 1947 (14 of 1947), the Central Government

hereby publishes the Award Ref. No. 23/2006 of the Cent.

Govt. Indus. Tribunal-cum-Labour Court, Asansol as shown

in the Annexure, in the industrial dispute between the

management of M/s. Eastern Coalfields Limited and their

workmen, received by the Central Government on

01/10/2015.

[No. L-22012/129/2005-IR (C-II)]

RAJENDER SINGH, Section Officer

ANNEXURE

IN THE COURT OF CENTRAL GOVT. INDUSTRIAL

TRIBUNAL-CUM-LABOUR COURT ASANSOL

Reference No.: 23/ITC/2006

Management of Girmint Colliery under Sripur Area of

E.C.L.

v/s

Sri Pardeshi Chamar

SETTLEMENT IN LOK ADALAT

Held on 4th September, 2015 at CGIT-cum-LC, Asansol

AWARD

On amicable settlement by both parties the dispute is

resolved in the Lok Adalat. The Form 'H' containing the

terms of agreement of this settlement to be executed by

both the parties in due course. Award is passed and signed

accordingly.

PRAMOD KUMAR MISHRA, Presiding Officer

ubZ fnYyh] 1 vDrwcj] 2015

dk-vk- 1951-—vkS|ksfxd fookn vf/kfu;e] 1947 ¼1947

dk 14½ dh /kkjk 17 ds vuqlj.k esa] dsUnzh; ljdkj ,lbZlh,y ds

izca/kra= ds lac) fu;kstdksa vkSj muds deZdkjksa ds chp] vuqca/k

esa fufnZ"V vkS|ksfxd fookn esa dsUnzh; ljdkj vkS|ksfxd

vf/kdj.k@Je U;k;ky;] tcyiqj ds iapkV lanHkZ la[;k 76@1997

dks izdkf'kr djrh gS] tks dsUnzh; ljdkj dks 01@10@2015 dks izkIr

gqvk FkkA

[lañ ,y&22012@60@1996&vkbZvkj ¼lh&2½]

jktsUnz flag] vuqHkkx vf/kdkjh

New Delhi, the 1st October, 2015

S.O. 1951.—In pursuance of Section 17 of the Industrial

Disputes Act, 1947 (14 of 1947), the Central Government

hereby publishes the Award Ref. No. 76/1997 of the Cent.

Govt. Indus. Tribunal-cum-Labour Court, Jabalpur as

shown in the Annexure, in the industrial dispute between

the management of Johilla Area of Sourthern Eastern

Coalfields Limited, and their workmen, received by the

Central Government on 01/10/2015.

[No. L-22012/60/1996-IR (C-II)]

RAJENDER SINGH, Section Officer

ANNEXURE

BEFORE THE CENTRAL GOVERNMENT

INDUSTRIAL TRIBUNAL-CUM-LABOUR

COURT, JABALPUR

No. CGIT/LC/R/76/97

4022

THE GAZETTE OF INDIA : OCTOBER 10, 2015/ASVINA 18, 1937

[PART II—SEC. 3(ii)]

General Secretary,

Rathtriya Koyla Khadan Mazdoor Sangh,

Johilla Area, Near Bus Stand,

Post Nowrozabad, Distt. Shahdol.

....Workman/Union

Versus

General Manager,

Johilla Area of SECL,

Post Nowrozabad Colliery,

Distt. Shahdol (MP)

....Management

AWARD

Passed on this 4th day of September 2015

1. As per letter dated 10.3.97 by the Government of India,

Ministry of Labour, New Delhi, the reference is received.

The reference is made to this Tribunal under Section-10 of

I.D. Act, 1947 as per Notification No. L-22012/60/96-IR

(C-II). The dispute under reference relates to:

"Whether the action of the management of SECL,

Bilaspur in withdrawing the promotion order of Shri Shankar

Rai Chowdhary (passed on 20-1-92) to the post of Special

Grade Clerk vide order dated 28.1.92 is legal and justified?

If not, to what relief the concerned workman is entitled?"

2. After receiving reference, notices were issued to the

parties. RKKMS Union submitted statement of claim on

behalf of workman Shri Chowdhary at page 2/1to 2/4. Case

of workman is that workman Shankar Rai Chodhwary was

initially appointed on 24.11.78 as clerk Grade III in G.M.

Office, Central Coalfields Ltd. On 13.11.1979, he was

promoted as clerk Grade-II. On 28.7.84, promoted as Clerk

Grade I. Workman was trapped in communal feeling dispute.

On 12.5.86, at Orissa, Bengali community people were

harassed by local Orissa Community. While workman was

harassed by local people, he requested for transfer to

Calcutta or Bilaspur Headquarter. In the year 1986, just

after the harassment, request for transfer was made.

Management of SECL didnot pay attention to the

application for transfer from 1986 to 1992 for 6 years. On

20.1.92, 6 persons including workman were promoted to

the post of Special Clerk Grade. Order of promotion was

issued by Personnel Manager Talcher Area. After his

promotion, workman was transferred to Lingaraj Open Cast

Project. Workman joined on promotional post on 22.1.92.

Suddenly on 28.1.92, the promotion order was kept in

abeyance. Thereafter all concerned workman were

transferred to Johilla Area on 26.3.92 stating request

transfer. Workman were surprised that after lapse of 6

years, the transfer application was brought to notice.

Workman alleged malafide on part of management,

workman immediately objected to it. Since workman belong

to poor middle Class family, in order to maintain large

family, he had no alternative but to accept the orders. He

joined Johilla Area on 27.3.92. That order of promotion to

the post of Special Grade was kept in abeyance. All those

persons were promoted as clerical staff except workman.

The Union submits that order of transfer of workman is

treated as administrative transfer and workman be given

promotion as special grade clerk with all monetary benefits.

3. 2nd party filed Written Statement at Page 11/1 to 11/8

opposing claim of the workman. The initial appointment of

workman as Clerk Grade III on 23.11.78 and his promotions

to clerk Grade II on 13.11.79, Clerk Grade I from 30.7.84 are

not disputed. Workman was working at SECL. He submitted

application for his transfer. Copies of the applications were

submitted to the Prime Minister, Minister of Energy and

other authorities. In light of said application, workman was

tranferred from Kalcher project vide order dated 27.7.91.

General Manager, Johilla Area relieved him from his present

posting. Workman has come on transfer from Kalcher Area.

The promotion zone for clerk, promotion from Grade I to

Special Grade is as per seniority cum merit. That as per

guidelines of the company, employee who comes on

request transfer is placed at bottom senirotiy. Workman

was transferred on request. His transfer cannot be treated

on administrative ground. Workman was relieved. He

accepted transfer joining the place of transfer. Workman

cannot be granted promotion from 20.1.94. The cadre

scheme is reproduced. That for promotion to special Grade

Clerk, qualification required is matriculation or equivalent

exam. 5 years experience as clerk Grade-I. Mode of

promotion is by DPC.

4. That as per order dated 20.6.92, six persons were

promoted as LDC including Shri S.R. Chowdhary workman.

Subsequently the matter was rectified. According to

seniority cum merit, DPC recommended promotion of mine

employees working as UDC. Workman was not

recommended by DPC. All adverse contentions of workman

are denied. 2nd party prays reference be answered in its

favour.

5. Union filed rejoined at Page 12/1 to 12/6 reiterating

his contentions in statement of claim. Management filed

rejoinder at Page 13/to 3/3 reiterating contentions in Written

Statement.

6. Considering pleadings on record, the points which

arise for my consideration and determination are as under,

My findings are recorded against each of them for the

reasons as below:—

(i)

Whether the action of the

In Negative

management of SECL, Bilaspur

in withdrawing the promotion

order of Shri Shankar Rai

Chowdhary (passed on 20.1.92)

to the post of Special Grade

Clerk vide order dated 28.1.92 is

legal and justified?

(ii)

If not, what relief the

As per final order.

workman is entitled to?"

[Hkkx II—[k.M 3(ii)]

Hkkjr dk jkti= % vDrwcj 10] 2015@vkf'ou 18] 1937

4023

REASONS

7. Workman has produced documents Exhibit W-1 order

of his promotion to the post of Sr. Clerk dated 22.1.92.

Exhibit W-2 joining letter of promotional post. Exdhibit

W-3 is letter dated 24.3.92 submitted to Project Officer

regarding his transfer alleging that it was clear that after

release from Tandsi Project, fresh order be issued. Exhibit

W-4 office order workman was directed to report for duty

to General Manager, Johilla Area since he was transferred

on own request. Exhibit W-5 workman submitted joining

report on 27.3.92 under protest alleging that he had

submitted application for transfer to Calcutta or Bilaspur

Head Office. That he was posted at Johilla Area. Exhibit

W-6 is letter by Sub Area Manager to Dy. Chief Personnel

Manager, Johilla Area. Since there was no steno/secretariat

cadre staff, service of S. Raichi was utilized as special case

though he was clerk Grade I. as per Exhibit W-6(a),

Dy. General Manager by his letter to Dy. Chief Personnel

Manager informed that performance of Shri S. Rai

Chowdhary was satisfactory. His servive were utilised as

there was not steno/secretariat cadre. Exhibit W-7 office

dated 28.9.97. 11 employees including workman were relied

on their transfer. Exhibit W-7(a) office order dated 4.10.97

workman was transferred to Johilla Project. Rajspati Yogi

was transferred to stores. Exhibit W-7(b) workman was

transferred to Vindya project. Exhibit W-8 office order dated

19.7.98 workman Rai Chowdhary was posted as PA.

8. Management produced documents Exhibit M-1

workman was transferred to Johilla Area. Exhibit M-1(a)

workman was directed to report General Manager, Johilla

Area on his transfer. Exhibit M-2 workman was relieved

and posted at Pinora Project from 27.3.94. Exhibit M-3, 3(a),

(b) is cadre scheme. Exhibit M-4 is order of promotion dated

20.1.92. Workman was also promoted. Exhibit M-5 is order

dated 28.1.92. Order of promotion was kept in abeyance.

9. Turning to the evidence, Ist party workman filed

affidavit of evidence of Kallimulla Beg and workman S.

Raichowdhary. Their affidavits are devoted to cover most

of the points in the statement of claim of Ist party. That

workman had requested transfer in 1986 due to communal

feelings. However he was transferred to Johilla Area after

6 years. It is stated in both the affidavit. Kalimulla in his

cross exmaination says he worked with workman at Pinoura

Project in 1992-93 since he jointed. The distance between

Pinoura Project and GM office is about 10 Kms. In their

cross-examination, both witnesses have reiterated that

though workman had requested in 1984, he was transferred

to Pinopura Project in 1990. Workman in his cross-

examination syas he had sent Exhibit W-1, its copies were

sent to several authorities. He had not withdrawn Exhibit

M-1. He received order M-2, M-3. Promotion of clerk in

area wise as oper seniority cum merit. Exhibit M-6 was

subseqauently introduced. As per Exhibit M-9, he was

promoted to Clerk Special Grade. That his grievance was

that in UDC Grade, he had acquired seniority. he was

trasnferred from Tilchar Sub Area. If he would have been

transferred in 1986, he had no grievance.

10. Affidavit of evidence is filed by Shri K.K. Singh, he

submitted that transfer to workman was on request.

Workman was not entitled to transfer benefits. Workman

was not recommended by DPC for higher promotion. In

his cross-examination, witness says in 1986, he was working

as Project Manager at Tilchar Area. He did not recollect on

what post he was working in 1991-92. He was acquainted

with the workman. That workman was desiring his transfer.

On his request, he did not recollect when workman had

submitted application for his transfer. Whether its copy is

produced on record. He did not recollect in 1986, workman

requested transfer to Bilaspur or Calcutta. In his cross-

examination, management's witness says that workman had

not submitted protest application. The documents Exhibit

W-3 shows workman had requested for cancellation of his

transfer. Exhibit W-5 is workman jointed at Johilla Area

under protest for the reasons that he had requested for

tranfer to Calcutta or Bilaspur. The evidence of workman is

supported by documents whereas management's witness

in his cross-examination is claiming ignorance on vital

points. Therefore evidence of workman is accepted.

Management has not explained any reasons why workman

was not tranferred on his request in 1986 when he was

facing communal harassment. What were reasons for

transfer in 1991 when workman had acquired seniority at

Tilcher itself. Therefore the order of transfer of workman

was issued with malafide intention denying promtoion.

Workman was promoted as per order dated 20.1.92. The

order of promotion was kept in abeyance as per order dated

28.1.92 is not justified. Workman on his transfer to Johilla

Area was given bottom seniority, secondly he was denied

promotion. The act of management is therefore illegal. For

the reasons discussed above, I record my finding in Point

No. 1 in Negative.

11. In the result, award is passed as under:—

(1) The action of the management of SECL, Bilaspur in

withdrawing the promotion order of Shri Shankar Rai

Chowdhary (passed on 20.1.92) to the post of Special Grade

Clerk vide order dated 28.1.92 is illegal.

(2) 2nd part is directed to treat order of transfer of

workman to Johilla Area as on administrative ground

without affecting his seniority and give benefit to the

order of his promotion dated 20.1.92. Workman be paid all

monetary benefits.

R.B. PATLE, Presiding Officer

ubZ fnYyh] 1 vDrwcj] 2015

dk-vk- 1952-—vkS|ksfxd fookn vf/kfu;e] 1947 ¼1947

dk 14½ dh /kkjk 17 ds vuqlj.k esa] dsUnzh; ljdkj bZlh,y ds

izcaèra= ds lac) fu;kstdksa vkSj muds deZdkjksa ds chp]

4024

THE GAZETTE OF INDIA : OCTOBER 10, 2015/ASVINA 18, 1937

[PART II—SEC. 3(ii)]

vuqca/k esa fufnZ"V vkS|ksfxd fookn esa dsUnzh; ljdkj vkS|ksfxd

vf/kdj.k@Je U;k;ky; vklulksy ds iapkV ¼lanHkZ la[;k

44@1997½ dks izdkf'kr djrh gS] tks dsUnzh; ljdkj dks 01-10-2015

dks izkIr gqvk FkkA

[lañ ,y&22012@340@1996&vkbZvkj ¼lh&II½]

jktsUnz flag] vuqHkkx vf/kdkjh

New Delhi, the 1st October, 2015

S.O. 1952.—In pursuance of Section 17 of the Industrial

Disputes Act, 1947 (14 of 1947), the Central Government

hereby publishes the Award (Ref. No. 44/1997) of the Cent.

Govt. Indus. Tribunal-cum-Labour Court, Asansol as shown

in the Anneuxre, in the industrial dispute between the

management of Kunustoria Colliery of M/s. Eastern

Coalfields Limited, and their workmen, received by the

Central Government on 01.10.2015.

[No. L-22012/340/1996-IR (C-II)]

RAJENDER SINGH, Setion Officer

ANNEXURE

BEFORE THE CENTRAL GOVERNMENT

INDUSTRIAL TRIBUNAL-CUM-LABOUR

COURT, ASANSOL

PRESENT:

Shri Pramod Kumar Mishra,

Presiding Officer

REFERENCE NO. 44 OF 1997

PARTIES:

The Management of Kunustoria Colliery of

M/s. ECL

Vs.

Shri Radhakrishna Mishra

REPRESENTATIVES:

For the Management

: Shri P.K. Das, Ld. Adv.

(ECL)

For the Union (Workman)

: Shri S.K. Pandey, Gen.

Secy. (CMC)

Industry:

Coal

State:

West Bengal

Dated:

07.09.2015

AWARD

In exercise of powers conferred by clause (d) of Sub-

section (1) and Sub-section 2(A) of Section 10 of the

Industrial Disputes Act, 1947 (14 of 1947), Govt. of India

through the Ministry of Labour vide its letter No. L-22012/

340/1996-IR(C-II) dated 22.07.1997 has been pleased to refer

the following dispute for adjudication by this Tribunal.

SCHEDULE

"Whether the denial of the management of

Kunustoria Colliery of ECL to regularise/promote

Sh. Radhakrishna Mishra, Cap Lamp Fitter as Asst.

Cap Lamp In-charge is legal and justified? If not, to

what relief is the workman entitled and from which

date?"

Having received the Order No. L-22012/340/1996-IR

(C-II) dated 22.07.1997 of the above said reference from the

Govt. of India, Ministry of Labour, New Delhi for

adjudication of the dispute, a Reference Case No. 44 of

1997 was registered on 28.07.1997 and accordingly an order

to that effect was passed to issue notices through the

registered post to the parties concerned directing them to

appear in the court on the date fixed and to file their written

statements along with the relevant documents and a list of

witnesses in support of their claims. In pursuance of the

said order notices by the registered post were sent to the

parties concerned.

Case called out Shri P.K. Das, Learned Advocate appears

on behalf of the management (ECL). Shri S.K. Pandey,

General Secretary of the Union (CMC) is present on behalf

of the workman.

Shri Pandey, representative of the workman declines to

contest the case further. He verbally submits that the

workman is no more interested to proceed with the case

further.

On perusal of the case record I find that the case was

fixed for evidence of workman on 03.02.2010 vide order

No. 64 dated 25.11.2009 and again for evidence and physical

appearance of the workman on 13.02.2013. But, neither the

workman appeared physically nor the evidence of the

workman has been filed. So it is apparent that the workman

is now at all interested to proceed with the case further.

This is a case of the year 1997 i.e. 18 years have already

passed. So I think it is not proper and just to keep this old

record pending without any result. As such the case is

closed and accordingly a 'No Dispute Award' may be passed.

ORDER

Let an "Award" be and same is passed as not dispute

existing. Send the copies of the order to the Govt. of India,

Ministry of Labour, New Delhi, for information and needful.

The reference is accordingly disposed of.

PRAMOD KUMAR MISHRA, Presiding Officer

ubZ fnYyh] 1 vDrwcj] 2015

dk-vk- 1953-—vkS|ksfxd fookn vf/kfu;e] 1947 ¼1947

dk 14½ dh /kkjk 17 ds vuqlj.k esa] dsUnzh; ljdkj bZlh,y ds

izcaèra= ds lac) fu;kstdksa vkSj muds deZdkjksa ds chp] vuqca/k esa

fufnZ"V vkS|ksfxd fookn esa dsUnzh; ljdkj vkS|ksfxd vf/kdj.k@Je

U;k;ky;] vklulksy ds iapkV ¼lanHkZ la[;k 42@2000½ dks izdkf'kr

djrh gS] tks dsUnzh; ljdkj dks 01@10@2015 dks izkIr gqvk FkkA

[lañ ,y&22012@543@1999&vkbZvkj ¼lh,e&II½]

jktsUnz flag] vuqHkkx vf/kdkjh

[Hkkx II—[k.M 3(ii)]

Hkkjr dk jkti= % vDrwcj 10] 2015@vkf'ou 18] 1937

4025

New Delhi, the 1st October, 2015

S.O. 1953.—In pursuance of Section 17 of the Industrial

Disputes Act, 1947 (14 of 1947), the Central Government

hereby publishes the Award (Ref. No. 42/2000) of the Cent.

Govt. Indus. Tribunal-cum-Labour Court, Asansol as shown

in the Annexure, in the industrial dispute between the

management of Nimcha(R) Colliery of M/s. Eastern

Coalfields Limited, and their workmen, received by the

Central Government on 01/10/2015.

[No. L-22012/543/1999-IR(CM-II)]

RAJENDER SINGH, Section Officer

ANNEXURE

BEFORE THE CENTRAL GOVERNMENT

INDUSTRIAL TRIBUNAL-CUM-LABOUR

COURT, ASANSOL

PRESENT:

Shri Pramod Kumar Mishra,

Presiding Officer

REFERENCE NO. 42 OF 2000

PARTIES:

The Management of Nimcha (R) Colliery of

M/s. ECL

Vs.

Shri Alokdeo Singh

REPRESENTATIVES:

For the Management

: Shri P.K. Goswami, Ld. Adv.

(ECL)

For the Union (Workman)

: Shri Rakesh Kumar,

President, KMC

Industry:

Coal State :West Bengal

Dated:

10.09.2015

AWARD

In exercise of powers conferred by clause (d) of Sub-

section (1) and Sub-section 2(A) of Section 10 of the

Industrial Disputes Act, 1947 (14 of 1947), Govt. of India

through the Ministry of Labour vide its letter No. L-22012/

543/1999-IR(CM-II) dated 06.07.2000 has been pleased to

refer the following dispute for adjudication by this Tribunal.

SCHEDULE

"Whether the action of the management of Nimcha(R)

Colliery under M/s. E.C. Ltd. in denying the date of

birth of Shri Alokdeo Singh as July, 1972 is justified?

If not, to what relief the workman is entitled?"

Having received the Order No. L-22012/543/1900-IR

(CM-II) dated 06.07.2000 of the above said reference from

the Govt. of India, Ministry of Labour, New Delhi for

adjudication of the dispute, a Reference Case No. 42 of

2000 was registered on 01.08.2000 and accordingly an order

to that effect was passed to issue notices through the

registered post to the parties concerned directing them to

appear in the court on the date fixed and to file their written

statements along with the relevant documents and a list of

witnesses in support of their claims. In pursuance of the

said order notices by the registered post were sent to the

parties concerned.

Case called out. Shri P.K. Goswami, Learned Advocate

appears on behalf of the management (ECL). None appears

on behalf of the workman/union.

On perusal of the case record it was found that the case

was fixed for filling evidence of the workman on 29.01.2013.

More than 2 years and 15 dates have so far been passed

but evidence of the workman has not been filed. Shri Rakesh

Kumar, President of the union, who represents this case on

behalf of the workman, has made his signature on 29.01.2013

and 19.06.2013. He has also received the notice of the

Tribunal on 26.08.2014, but to no effect.

It seems that neither the workman nor the union is

interested to proceed with the case further. The case is of

the year 2000 i.e. 15 years ago and I think it unreasonable

to keep this old record pending. As such the case is closed

accordingly a 'No Dispute Award' may be passed.

ORDER

Let an "Award" be and same is passed as not dispute

existing. Send the copies of the order to the Govt. of India,

Ministry of Labour, New Delhi, for information and needful.

The reference is accordingly disposed of.

PRAMOD KUMAR MISHRA, Presiding Officer

ubZ fnYyh] 1 vDrwcj] 2015

dk-vk- 1954-—vkS|ksfxd fookn vf/kfu;e] 1947 ¼1947

dk 14½ dh /kkjk 17 ds vuqlj.k esa] dsUnzh; ljdkj bZlh,y ds izca/

kra= ds lac) fu;kstdksa vkSj muds deZdkjksa ds chp] vuqca/k esa

fufnZ"V vkS|ksfxd fookn esa dsUnzh; ljdkj vkS|ksfxd vf/kdj.k@Je

U;k;ky;] vklulksy ds iapkV ¼lanHkZ la[;k 81@2005½ dks izdkf'kr

djrh gS] tks dsUnzh; ljdkj dks 01@10@2015 dks izkIr gqvk FkkA

[lañ ,y&22012@140@2004&vkbZvkj ¼lh,e&II½]

jktsUnz flag] vuqHkkx vf/kdkjh

New Delhi, the 1st October, 2015

S.O. 1954.—In pursuance of Section 17 of the Industrial

Disputes Act, 1947 (14 of 1947), the Central Government

hereby publishes the Award (Ref. No. 81/2005) of the Cent.

Govt. Indus. Tribunal-cum-Labour Court, Asansol as shown

in the Annexure, in the industrial dispute between the

management of Amritnagar Colliery of M/s. ECL, and their

workmen, received by the Central Government

on 01/10/2015.

[No. L-22012/140/2004-IR(CM-II)]

RAJENDER SINGH, Section Officer

4026

THE GAZETTE OF INDIA : OCTOBER 10, 2015/ASVINA 18, 1937

[PART II—SEC. 3(ii)]

ANNEXURE

BEFORE THE CENTRAL GOVT. INDUSTRIAL

TRIBUNAL-CUM-LABOUR COURT, ASANSOL

PRESENT:

Sri Pramod Kumar Mishra,

Presiding Officer

REFERENCE NO. 81 OF 2005

PARTIES:

The management of Amritnagar Colliery of

M/s. ECL

Vs.

Sri R.N. Bhati and 36 others

REPRESENTATIVES:

For the management:

Sri P.K. Das, Ld. Adv. (CLE)

For the union (Workman):

H.L. Soni, Secretary (KMC)

Industry : Coal

State : West Bengal

Dated: 18.09.2015

AWARD

In exercise of powers conferred by clause (d) of Sub-

section (1) and Sub-section 2(A) of Section 10 of the

Industrial Disputes Act, 1947 (14 of 1947), Govt. of India

through the Ministry of Labour vide its letter No. L-22012/

140/2004-IR(CM-II) dated 27.06.2005 has been pleased to

refer the following dispute for adjudication by this Tribunal.

SCHEDULE

''whether the action of the Amritnagar Colliery under

M/s. CEL in denying upgradation in the next higher

grade in respect of Shri R.N. Bhati and 36 others (list

of workmen enclosed) clerical staff is legal and

justified? If not, to what relief the concerned workman

is entitled?''

Having received the Order No. L-22012/140/2004-IR (CM-II)

dated 27.06.2005 of the above said reference from the Govt.

of India. Ministry of Labour, New Delhi for adjudication of

the dispute, a Reference Case No. 81 of 2005 was registered

on 17.08.2005 and accordingly an order to that effect was

passed to issue notices through the registered post to the

parties concerned directing them to appear in the court on

the date fixed and to file their written statements along with

the relevant documents and a list of witnesses in support

of their claims. In pursuance of the said order notices by

the registered post were sent to the parties concerned.

Case called out. Sri P.K. Das, Learned Advocate appears

on behalf of the management (ECL) but he has not filed

written statement till date. None appears on behalf of the

workman/union.

On perusal of the case record I found that Sri H.L. Soni,

secretary of the union (KMC) appeared and filed written

statement on behalf of the workman on 26.10.2005. But

after 20.01.2007 the union is neither appearing nor taking

any step. 27 dates have been granted after 20.01.2007 but

neither the workman nor his representative turned up. Even

registered notice was sent to the union on 17.05.2012 and

25.07.2014 but to no effect. It seems to me that the union/

workman is now not at all interested to proceed with the

case further. The reference case is also old i.e. in the year of

2005. So the case is closed and accordingly a 'No Dispute

Award' may be passed.

ORDER

Let an ''Award'' be and same is passed as no dispute

existing. Send the copies of the order to the Govt. of India.

Ministry of Labour, New Delhi, for information and needful.

The reference is accordingly disposed of.

PRAMOD KUMAR MISHRA, Presiding Officer

ubZ fnYyh] 1 vDVwcj] 2015

dk-vk- 1955-—vkS|ksfxd fookn vf/kfu;e] 1947 ¼1947

dk 14½ dh /kkjk 17 ds vuqlj.k esa] dsUnzh; ljdkj bZlh,y ds izca/

kra= ds lac) fu;kstdksa vkSj muds deZdkjksa ds chp] vuqca/k esa

fufnZ"V vkS|ksfxd fookn esa dsUnzh; ljdkj vkS+k|ksfxd vf/kdj.k@Je

U;k;ky; vklulksy ds iapkV ¼lanHkZ la[;k 66@2005½ dks izdkf'kr

djrh gS] tks dsUnzh; ljdkj dks 01@10@2015 dks izkIr gqvk FkkA

[la- ,y&22012@314@2004&vkbZvkj ¼lh,e&II½]

jktsUnz flag] vuqHkkx vf/kdkjh

New Delhi, the 1st October, 2015

S.O. 1955.—In pursuance of Section 17 of the Industrial

Disputes Act, 1947 (14 of 1947) the Central Government

hereby publishes the Award (Ref. No. 66/2005) of the Cent.

Govt. Indus. Tribunal-cum-Labour Court. Asansol as

shown in the Annexure, in the industrial dispute between

the management of M/s Eastern Coalfield Limited and their

workmen, received by the Central Government on

01.10.2015.

[No. L-22012/314/2004- IR (CM-II)]

RAJENDER SINGH, Section Officer

ANNEXURE

BEFORE THE CENTRAL GOVT. INDUSTRIAL

TRIBUNAL-CUM-LABOUR COURT, ASANSOL

PRESENT:

Sri Pramod Kumar Mishra,

Presiding Officer

REFERENCE NO. 66 OF 2005

PARTIES:

The management of Kunustoria Colliery of

M/s. ECL

Vs.

Sri Sanatan Majhi

[Hkkx II—[k.M 3(ii)]

Hkkjr dk jkti= % vDrwcj 10] 2015@vkf'ou 18] 1937

4027

REPRESENTATIVES:

For the management:

Sri P.K. Das, Ld. Adv. (CLE)

For the union (Workman): None

INDUSTRY :

COAL

STATE:

WEST BENGAL

Dated:

17.09.2015

AWARD

In exercise of powers conferred by clause (d) of sub-

section (1) and sub-section 2(A) of Section 10 of the

Industrial Disputes Act, 1947 (14 of 1947), Govt. of India

through the Ministry of Labour vide its letter No. L- 22012/

314/2004-IR (CM-II) dated 20.07.2005 has been pleased to

refer the following dispute for adjudication by this Tribunal.

SCHEDULE

''whether the action of the Kunustoria Colliery M/s.

Eastern Coalfields Limited in dismissng Sh. Sanatan

Majhi from Services w.e.f. 26.03.1999 is legal and

justified ? if not, to what relief the concerned workman

is entitled.?

Having received the Order No. L-22012/314/2004-IR

(CM-II) dated 20.07.2005 of the above said reference from

the Govt. of India. Ministry of Labour, New Delhi for

adjudication of the dispute, a Reference, Case No. 66 of

2005 was registered on 17.08.2005 and accordingly an order

to that effect was passed to issue notices through the

registered post to the parties concerned directing them to

appear in the court on the date fixed and to file their written

statements along with the relevant documents and a list of

his authorization of their claims. In pursuance of the said

order notices by the registered post were sent to the parties

concerned.

Case called out. Sri P.K. Das, Learned Advocate appears

on behalf of the management (ECL) but he has not filed

wirtten statement till date. None appears on behalf of the

workman/union.

On perusal of the case record I found that the union

neither appearing nor taking any step from 17.11.2009.

30 dates have been granted after 26.08.2009. Registered

notices were also issued to the workman/union on

24.05.2012 and 20.08.2014 but all are in vain. It seems to me

that the union is now not at all interested to proceed with

the case further. The case is also very old - in the year 2005.

As such the case is closed and accordingly a 'No Dispute

Award' may be passed.

O R D E R

Let an ''Award'' be and same is passed as no dispute

existing. Send the copies of the order to the Govt. of India.

Ministry of Labour, New Delhi, for information and needful.

The reference is accordingly disposed of.

PRAMOD KUMAR MISHRA, Presiding Officer

ubZ fnYyh] 1 vDrwcj] 2015

dk-vk- 1956-—vkS|ksfxd fookn vf/kfu;e] 1947 ¼1947

dk 14½ dh /kkjk 17 ds vuqlj.k esa] dsUnzh; ljdkj bZlh,y ds izca/

kra= ds lac) fu;kstdksa vkSj muds deZdkjksa ds chp] vuqca/k esa

fufnZ"V vkS|ksfxd fookn esa dsUnzh; ljdkj vkS+k|ksfxd vf/kdj.k@Je

U;k;ky; vklulksy ds iapkV (lanHkZ la[;k 97 @2006) dks izdkf'kr

djrh gS] tks dsUnzh; ljdkj dks 01@10@2015 dks izkIr gqvk FkkA

[la- ,y&22012@179@2006&vkbZvkj ¼lh,e&II½]

jktsUnz flag] vuqHkkx vf/kdkjh

New Delhi, the 1st October, 2015

S.O. 1956.—In pursuance of Section 17 of the Industrial

Disputes Act, 1947 (14 of 1947)] the Central Government

hereby publishes the Award (Ref. No. 97/2006) of the Cent.

Govt. Indus. Tribunal-cum-Labour Court. ASANSOL as

shown in the Annexure, in the industrial dispute between

the management of M/s ECL, and their workmen, received

by the Central Government on 01.10.2015.

[No. L-22012/179/2006- IR (CM-II)]

RAJENDER SINGH, Section Officer

ANNEXURE

BEFORE THE CENTRAL GOVERNMENT

INDUSTRIAL TRIBUNAL-CUM-LABOUR

COURT, ANANSOL

Present :

Sri Pramod Kumar Mishra,

Presiding Officer

REFERENCE NO. 97 OF 2006

Parties :

The management of Gourandih-Begunia

Colliery of M/s. ECL

Versus

Sri Nirod Bouri

REPRESENTATIVES:

For the management

:

Sri P.K. Goswami, Ld. Adv.

(ECL)

For the union (Workman) :

H.L. Soni, Secretary (KMC)

Industry :

Coal

State :

West Bengal

Dated :

18.09.2015

AWARD

In exercise of powers conferred by clause (d) of sub-

section(1) and sub-section 2(A) of Section 10 of the

Industrial Disputes Act, 1947 (14 of 1947), Govt. of India

through the Ministry of Labour vide its letter No. L-22012/

179/2006-IR(CM-II) dated 29.11.2006 has been pleased to

refer the following dispute for adjudication by this Tribunal.

SCHEDULE

"Whether the action of the Gourandih-Begunia

Colliery in dismissing Sri Nirod Bouri, Drillier w.e.f.

4028

THE GAZETTE OF INDIA : OCTOBER 10, 2015/ASVINA 18, 1937

[PART II—SEC. 3(ii)]

31.10.2003 is legal and justified? If not, to what relief

the workman is entitled?"

Having received the Order No. L-22012/179/2006-IR

(CM-II) dated 29.11.2006 of the above said reference from

the Govt. of India, Ministry of Labour, New Delhi for

adjudication of the dispute, a Reference Case No. 81 of

2005 was registered on 17.08.2005 and accordingly an order

to that effect was passed to issue notices through the

registered post to the parties concerned directing them to

appear in the court on the date fixed and to file their written

statements along with the relevant documents and a list of

witnesses in support of their claims. In pursuance of the

said order notices by the registered post were sent to the

parties concerned.

Case called out. Both the parties are absent.

On perusal of the case record I found that this is a case

of the year 2006, one of the oldest cases in the Tribunal.

The case is represented by Sri H.L. Soni, Secretary of the

Union (KMC) on behalf of the workman and Sri P.K.

Goswami, Ld. Adv. on behalf of the management. Written

Statement has been filed the management on 05.10.2007.

The union neither files written statement nor takes any

step from the beginning. First notice was issued on

12.01.2007 and 9 dates were granted after that. 2nd notice

was issued on 20.07.2009 and 14 dates were granted after

that. 3rd notice was again sent to the union on 02.01.2012

and 13 dates were granted after issuing 3rd notice. 4th and

final notice was issued on 01.09.2014 and the same was

received by Sri. H.L. Soni himself on 12.09.2014. Two dates

were granted after that but the union/workman neither

appears nor files written statement. It seems that the union/

workman is not at all interested to proceed with the case

further. As such the case is closed and accordingly a 'No

Dispute Award' may be passed.

ORDER

Let an "Award" be and same is passed as no dispute

existing. Send the copies of the order to the Govt. of India,

Ministry of Labour, New Delhi, for information and needful.

The reference is accordingly disposed of.

PRAMOD KUMAR MISHRA, Presiding Officer

ubZ fnYyh] 1 vDrwcj] 2015

dk-vk- 1957-—vkS|ksfxd fookn vf/kfu;e 1947 ¼1947 dk

14½ dh /kkjk 17 ds vuqlj.k esa dsUnzh; ljdkj MCY;wlh,y ds

izcaèra= ds lac) fu;kstdksa vkSj muds deZdkjksa ds chp vuqca/k esa

fufnZ"V vkS|ksfxd fookn esa dsUnzh; ljdkj vkS|ksfxd vf/kdj.k ,oa

Je U;k;ky;] tcyiqj ds iapkV ¼lanHkZ lañ 117@1995½ dks izdkf'kr

djrh gS tks dsUnzh; ljdkj dks 01@10@2015 dks izkIr gqvk FkkA

[lañ ,y&22012@559@1994 vkbZvkj ¼lh&II½]

jktsUnz flag] vuqHkkx vf/kdkjh

New Delhi, the 1st October, 2015

S.O. 1957.—In pursuance of Section 17 of the Industrial

Disputes Act, 1947 (14 of 1947), the Central Government

hereby publishes the award (Ref. No. 117/1995) of the

Central Government Industrial Tribunal-Cum-Labour Court,

Jabalpur now as shown in the Annexure in the Industrial

Dispute between the management of Kahan Area of Western

Coalfields Limited, and their workmen, received by the

Central Government on 01/10/2015.

[No. L-22012/559/1994-IR (C-II)]

RAJENDER SINGH, Section Officer

ANNEXURE

BEFORE THE CENTRAL GOVERNMENT

INDUSTRIAL TRIBUNAL-CUM-LABOUR

COURT, JABALPUR

No. CGIT/LC/R/117/95

The Secretary,

Rashtriya Koyla Khadan Mazdoor Sangh (INTUC),

Sub Regional Office, Damua,

P.O. Damua, Distt. Chhindwara

...Workman/Union

Versus

General Manager,

WCL, Kahan Area,

PO Dungaria,

Distt. Chhindwara

...Management

AWARD

Passed on this 4th day of September 2015

1. As per letter dated 19.6.1995 by the Government of

India, Ministry of Labour, New Delhi, the reference is

received. The reference is made to this Tribunal under

Section-10 of I.D. Act, 1947 as per Notification No. L-22012/

559/94-IR(C-II). The dispute under reference relates to:

"Whether the action of the management of project

Officer, Tandsi Project of WCL, PO Tandsi, Distt.

Chhidndwara (MP) in not correcting the date of birth

of Shri Sayed Ramjan ali S/o Sayed Wajid Ali, Sr.

Overman of Tandsi project of WCL, Kanhan Area

from 1.1.1935 to 5.1.1937 without giving any

consideration to his date of birth recorded as 5.1.1937

in the High School Supplementary Examination, 1963

produced by him is justified? If not, to what relief the

concerned workman is entitled to?"

2. After receiving reference, notices were issued to the

parties. Workman submitted statement of claim at page 3/2

to 3/6. Workman died during pendency of reference

proceeding. His LRs are brought on record. The case of Ist

party workman is that he was appointed as Mining Sirdar

on 26.9.66. He was transferred to Rawanwara colliery.

[Hkkx II—[k.M 3(ii)]

Hkkjr dk jkti= % vDrwcj 10] 2015@vkf'ou 18] 1937

4029

Workman was dismissed on 9.5.72. He was reinstated on

30.10.72. Again workman was transferred to Ambara in 1976,

Mohan Colliery in 1982, VTC Sukari in 1984, Tandsi project

in 1987. Workman had taken voluntary retirement on

19.02.93. Workman submits that after taking VRS, he is

entitled to benefits under the VRS Scheme dated 8.3.89.

Management wrongly assessed his date of birth. He passed

Matriculation in 1983. In SSC Certificate, Gas Testing

Certificate, his date of birth is shown 5.1.1937. In Form B

register, his date of birth was shown 1.1.1935 instead of

5.1.1937. Workman prays for correction of his date of birth.

3. 2nd party filed Written Statement Statement at page

4/1 to 4/3 opposing claim of the workman. 2nd party submits

in Form B Register, date of birth of workman is recorded

1.1.1935. It is statutory register maintained as per Coal

Mines Regulation. The entries made in register is accepted

as correct as the entries were taken on information furnished

by workman. I.I. No. 76 was issued to JBCCI under NCWA-III.

The excerpts of services of workman were prepared.

Workman was given opportunity for correction of date of

birth. Wrokman did not raise objection about his age shown

in Service Excerpts. There was no dispute about the date

of birth of workman. I.I. No. 37 as per NCWA-II was

implemented. It was displayed on notice board inviting

objections of the workman aggrieved about their date of

birth to submit objection within 90 days. Reference is vague.

It does not specify record which is not considered by

management. Date of birth entered in record by

management is correct. Workman not prodcued certificate

about his date of birth while he was in service. Workman

has taken VRS on 19.02.95. On such ground, 2nd party

prays reference be answered in its favour.

4. Identical Written Statement is also submitted by 2nd

party at page 8/1 to 8/7.

5. Considering pleadings on record, the points which

arise for my consideration and determination are as under.

My findings are recorded against each of them for the

reasons as below:—

(i)

Whether the action of the

In Affirmative

management of project Officer,

Tandsi Project of WCL, PO

Tandsi, Distt. Chhindwara

(MP) in not correcting the date

of birth of Shri Sayed Ramjan

ali S/o Sayed Wajid Ali, Sr.

Overman of Tandsi project of

WCL, Kanhan Area from

1-1-1935 to 5.1.1937 without

giving any consideration to his

date of birth recorded as

5.1.1937 in the High School

Supplementary Examination,

1963 produced by him is

justified?

(ii)

If not, what relief the

Workman is not

workman is entitled to?"

entitled to any relief.

REASONS

6. As per terms of reference, the dispute pertains to date

of birth of workman. The dispute is referred by Goernment

of India, Ministry of Labour as per letter dated 19.6.95.

Workman has taken VRS on 19.2.93. The dispute is raised

after taken VRS by workman.

7. Workman filed affidait of his eidence in support of his

claim contending that in certificate of supplementary SSC

Examination, Gas Testing Certificate, overman Certificate,

School Leaing Certificate, his date of birth is recorded

5.1.1937. His date of birth was wrongly recorded as 1.1.1935

illegally. He had given letter to the management for

correction of date of birth of 14.4.1989. Workman could not

be cross-examined. He died during pendency of the

proceeding. Affidavit of evidence are also filed by his son

Syed Akram Ali corroborating evidence of workman that

his date of birth was 5.1.1937. The documents Exhibit W-1

Certificate of supplementary Exam, Exhibit W-2 Gas Testing

Certificate, Exhibit W-3 Overman Certificate, Exhibit W-4

school leaving certificate, Exhibit W-5 LPC shows date of

birth of workman is recorded 5.1.1937. Syed Akram S/o

Workman in his cross-examination says documents Exhibit

W-1 to W-4 were received by his father. He was unable to

tell whether original of Exhibit W-5 was with his father. His

father was appointed on 30.10.72. He taken VRS in 1992. At

that time, he was working as Sr. Overman. He claims

ignorance for date of birth of his father was shown at the

time of VRS.

8. Management's witness Shri Amit Kumar Mathur filed

affidavit of his evidence supporting contentions of

management. That date of birth of deceased workman in

Form B register was recorded 1.1.1935. I.I. No.76 was issued

by JBCCI as per NCWA-III. Service excerpts were prepared.

Date of birth of workman was shown 1.1.1935. Workman

did not submit any objection to it. Workman did not dispute

his date of birth. He had taken VRS on 19.2.93. Form hjis

evidence, documents Exhibit M-1 to M-6 are proved.

Management's witness in his cross examination says he

had seen documents about VRS of deceased workman.

I.I. No. 76 applied in case of dispute for date of birth. He

claims ignorance w.r.t 14.4.89 denies its contents. He denies

that Accounts Officer had suggested for correction of date

of birth of workman. The evidence on record shows

deceased workman while in service of 2nd party did not

raise dispute about his date of birth. The present dispute is

raised after workman had taken VRS on 19.2.93. In evidence

of management's witness that service excerpts were

prepared as per I.I. No. 76. Workman had not raised any

objection is not shattered. The dispute raised by workman

after taking VRS as such not in service with 2nd party is

not permissible in view of I.I. No. 76. legal position is also

settled that the objection about date of birth should be

4030

THE GAZETTE OF INDIA : OCTOBER 10, 2015/ASVINA 18, 1937

[PART II—SEC. 3(ii)]

raised at the earliest. The evidence of Syed Akhtar Ali is

clear that documents Exhibit W-1 to W-4 were with his

father. Why deceased workman did not raise dispute about

his date of birth while he was in service from 1966 and

reinstated in 1972. Though the date of birth of workman is

shown 5.1.1937 in Exhibit W-1 to W-4, after workman has

taken VRS, the dispute has raised. The correction of date

of birth of workman after VRS cannot be accepted.

Management has produced documents Exhibit M-1 about

reinstatement of workman in 1972, M-2 is copy of LPC,

date of birth of workman is shown 1-1-1935. Exhibit M-3

Form B date of birth is shown 1-1-1935. Exhibit M-4 Service

Excerpts of workman, his date of birth is shown 1-1-1935

inviting objections within 14 days.

9. Management's witness in his cross-examination says

that in matter about correction of date of birth of workman

was not received. Therefore no enquiry was taken in the

matter.

10. Shri A.K. Shashi relies on ratio held in appeal 8634/

13. He also relies on judgment in Writ petition 18/99. The

present dispute is raised for correction of date of birth after

VRS taken by workman. The detailed discussion of those

judgments is not necessary. For above reasons, I record

my finding in Point No. 1 in Affirmative.

11. In the result, award is passed as under:—

(1) The action of the management is proper and legal.

(2) Workman/LRs are not entitled to any relief.

R.B. PATLE, Presiding Officer

ubZ fnYyh] 1 vDrwcj] 2015

dk-vk- 1958-—vkS|ksfxd fookn vf/kfu;e] 1947 ¼1947

dk 14½ dh /kkjk 17 ds vuqlj.k esa] dsUnzh; ljdkj MCY;wlh,y ds

izca/kra= ds lac) fu;ksatdksa vkSj muds deZdkjksa ds chp] vuqca/k esa

fufnZ"V vkS|ksfxd fookn esa dsUnzh; ljdkj vkS|ksfxd vf/kdj.k@Je

U;k;ky; tcyiqj ds iapkV ¼lanHkZ la[;k 110@1995½ dks izdkf'kr

djrh gS] tks dsUnzh; ljdkj dks 01@10@2015 dks izkIr gqvk FkkA

[lañ ,y&22012@42@1994&vkbZvkj ¼lh&II½]

jktsUnz flag] vuqHkkx vf/kdkjh

New Delhi, the 1st October, 2015

S.O. 1958.—In pursuance of Section 17 of the Industrial

Disputes Act, 1947 (14 of 1947), the Central Government

hereby publishes the Award (Ref. No. 110/1995) of the Cent.

Govt.Indus. Tribunal-cum-Labour Court, Jabalpur as shown

in the Annexure, in the industrial dispute between the

management of Gajandoh Mines of Western Coalfields

Limited, and their workmen, received by the Central

Government on 01/10/2015.

[No. L-22012/42/1994-IR (C-II)]

RAJENDER SINGH, Section Officer

ANNEXURE

BEFORE THE CENTRAL GOVERNMENT

INDUSTRIAL TRIBUNAL-CUM-LABOUR

COURT, JABALPUR

No. CGIT/LC/R/110/95

Shri Faiyazuddin

S/o Sirajuddin, Ex. Clipman,

Ward No. 4, Eklehra Colliery,

Distt. Chhindwara

...Workman

Versus

The Manager,

Gajandoh Mines of WCL,

PO Parasia,

Distt. Chhindwara

...Management

AWARD

Passed on this 2nd day of September 2015

1. As per letter dated 7-6-95 by the Government of India,

Ministry of Labour, New Delhi, the reference is received.

The reference is made to this Tribunal under Section - 10 of

I.D. Act, 1947 as per Notification No. L-22012/42/94-IR

(C-II). The dispute under reference relates to:

"Whether the action of the management of Gajandoh

Mine of Western Coal Fields Limited in dismissing

the services of Shri Faiyazuddin clipman w.e.f. 11-11-92

is legal and justified? If not, what relief the workman

is entitled to?"

2. After receiving reference, notices were issued to the

parties. Workman submitted statement of claim at page 2/1

to 2/4. Case of workman is that he was appointed in Eklehra

colliery in 1973. He was promoted to the post of Trammer

and post of Clipman Cat-IV subsequently. He was

transferred to Bhamori colliery in 1984. Again he was

transferred to Gajandoh mine in June 1994. It is further

submitted that Manager Gajandoh colliery adopted rigid

view against him for Union activities. He was falsely

implicated for charges of theft, fraud, dishonesty with

employers business and property. Manager has complained

to police regarding the same charges, trial was over. That

management denied to supply copy of FIR and statement

of prosecution witnesses. Workman was denied

opportunity for his defence in the enquiry. That Civil Court

had stayed domestic enquiry till ending criminal trial in

criminal court. It was unfair to compel him to defence his

witness in domestic enquiry. Enquiry was proceeded exparte

in violation of the stay order by court amounting to

contempt. That domestic enquiry conducted during

pendency of criminal trial is vitiated. Findings in enquiry is

illegal. The chargesheet alledged that report against

workman was received. He had entered in the mine in

midnight without helmet and lamp and bringing 20mt. cable

form mine was caught. It was alleged that I caused damage

[Hkkx II—[k.M 3(ii)]

Hkkjr dk jkti= % vDrwcj 10] 2015@vkf'ou 18] 1937

4031

of Rs. 10,000 to the company. Workman denied charges

against him. Shri A.K. Singh was appointed Enquiry Officer.

Enquiry was completed was empty formality. Enquiry Officer

was putting questions during examination in chief by the

management's representative was admitted by Enquiry

Officer.

3. It is further submitted that the chargesheet is vague

and Manager not specified allegations of the charges.

Workman committed misconduct. Chargesheet was issued

to workman alleging misconduct. Subsequently FIR was

lodged to policy management in Civil Suit hardly in Court.

DE was stayed. Criminal case was pending. Enquiry Officer

denied equal protection of law to workman. That he was

falsely implicated by management. The management failed

to prove misconduct alleged against him in the chargesheet.

Management could not produce Enquriy report during

conciliation proceedings. That action was taken by Manager

independently in the absence of Enquiry Report in violation

of principles of natural justice. Enquiry is vitiated. On such

ground, workman prays for appropriate relief.

4. 2nd party filed Written Statement at Page 6/1 to 6/3

opposing claim of the workman. 2nd party submits that

workman was working as clipman in Gajandoh mine of WCL.

On 24-8-92, workman was on duty in 2nd shift. After he

was relieved with view to commit theft, he entered in mine

unauthorisely and attempted to steal 20mt cable from mine.

He was caught red handed while attempting to steal said

property. Chargesheet was issued to workman. He did not

submit any reply to the chargesheet. Shri A.K. Singh

Personnel Officer was appointed as Enquiry Officer.

Shri A.K. Kapoor was appointed as management's

representative. Enquiry Officer vide notice dated 14-9-92

directed parties to appear on 16-9-92. Management

representative and workman had appeared on said date.

Workman denied charges against him. When workman was

asked about appointing co-worker for his defence, workman

submitted application. Enquriy was adjourned to 18-9-92.

On said date, workman nominated Abdul Raut Mining sirdar

as his co-worker. He was permitted to represent workman.

Enquiry was adjourned to 19-9-92. On above date, workman

appeared alongwith co-worker. He submitted application

requesting standing orders, documents of enquiry.

Workman was shown entire file for study by co-worker.

Entire papers were readover and explained to him. Enquiry

was conducted in presence of workman and his co-worker.

The witnesses of management were cross-examined. The

enquiry was closed. 2nd party reiterates that enquiry was

held properly following principles of natural justice.

Opportunity for defence was given to the workman. The

action of the management is justified. It is denied that

enquiry was not properly conducted. It is reiterated that

workman was indulged in theft of company's property. He

is not a fit person to be retained in service. Management

has no confidence in workman. Claim of workman be

rejected.

5. Workman submitted rejoinder at Page 9/1 to 9/3

reiterating his contentions in statement of claim.

6. Management also filed rejoinder at Page 8/1 to 8/6

reiterating contentions in written statement.

7. As per order dated 11-8-2014, enquiry conducted

against workman is found vitiated. 2nd party was permitted

to prove misconduct adducing evidence.

8. Considering pleadings on record, the points which

arise for my consideration and determination are as under.

My findings are recorded against each of them for the

reasons as below:—

(i)

Whether the charges/

In Negative

misconduct alleged againsts

workman is proved from

evidence in Enquiry

proceedings?

(ii)

Whether the punishment of

In Negative

dismissal imposed against

workman is proper and legal?

(iii)

If not, what relief the

As per final order

workman is entitled to?"

REASONS

9. Enquiry conducted against workman is found illegal.

2nd party was permitted to prove misconduct by adducing

evidence. Management filed affidavit of witness Prakash

Agrawal. Affidavit of management's witness has stated

that workman was working as clipman in Gajandoh branch.

On 24-8-92, he was on duty in 2nd shift without permission

of competent officer, workman had entered in mine in the

night. On 24-8-92, he was on duty by the side of shift

overman. Other employee Bhikari and Jagannath were

working in Electrical department. They had given

information about thief had entered. He had given said

information to security guard Sidhu Prasad and Ramkewal.

Shift Incharge Shri Deshpande during inspection

Shri Fiyazuddin (workman) and Ramdas were found in the

mine. They were not workman in his shift. They had not

entered in mine with his permission. Fiyazuddin and Ramdas

were not wearing helmet and lamp. In his cross-examination,

management's witness claims ignorance about chargesheet

issued to Fiyazuddin and Ramdas. He is acquainted with

Ramdas. He claims ignorance whether he is still working in

establishment of 2nd party or he is re-employed. He was

witness in Enquiry Proceedings. On 19-9-92, he was not

present in Enquiry Proceedings. In his further cross-

examination, management's witness says he had not seen

Fiyazuddin and Ramdas entering the mine. He had seen

them in the underground mine. Workman is acquitted by

criminal court. Copy of judgement is produced on record.

Judgment shows that Ramdas and Fiyazuddin were

prosecuted under Section 380/34 IPC. Both of them were

acquitted by JMFC, Chhindwara. The chargesheet issued

4032

THE GAZETTE OF INDIA : OCTOBER 10, 2015/ASVINA 18, 1937

[PART II—SEC. 3(ii)]

to workman is produced at Exhibit M-1. Chargesheet was

issued under Clause 17(1) of standing orders alleging

misconduct of theft, dishonesty and violation of mining

rules 1952. As enquiry is found vitiated, the evidence in

Enquiry Proceedings cannot be considered. The evidence

of management's witness is not cogent that he had seen Ist

party workman entering in the mine. His evidence is silent

about the workman carrying 20mt. cable with him. The

evidence of management's witness is not sufficient to

establish admitted theft or fraudulent intention. When

workman is acquitted in criminal case for the same allegation,

judgment of criminal court deserves to be respected. The

charge against workman is not proved therefore I record

my finding in Point No. 1 Negative.

10. Point No. 2 In view of my finding in Point No. 1

charge against workman is not proved, punishment of

dismissal imposed against workmen cannot be sustained.

The punishment of dismissal of workman therefore deserves

to be quashed. Accordingly I record my finding in Point

No. 2.

11. Workman was initially appointed in 1973. He was

dismissed from service on 11-11-92 after about 19 years

service. Workman died during pendency. His LRs are

brought on record. Workman cannot be reinstated.

Considering above facts, reasonable compensation could

be awarded to the LRs of deceased workman. Accordingly

I record my finding in Point No. 3.

12. In the result, award is passed as under:—

(1) The action of the management of Gajandoh Mine

of Western Coal Fields Limited in dismissing the

services of Shri Faiyazuddin clipman w.e.f. 11-11-92

is not proper and legal. The dismissal of workman

is set-aside.

(2) 2nd party is directed to pay compensation

Rs. 2,50,000/- to the workman.

R. B. PATLE, Presiding Officer

ubZ fnYyh] 1 vDrwcj] 2015

dk-vk- 1959-—vkS|ksfxd fookn vfèfu;e] 1947 ¼1947

dk 14½ dh èkjk 17 ds vuqlj.k esa dsUnzh; ljdkj bZlh,y ds

izcaèra= ds lac) fu;kstdksa vkSj muds deZdkjksa ds chp vuqcaè esa

fufnZ"V vkS|ksfxd fookn esa dsUnzh; ljdkj vkS|ksfxd vfèdj.k@Je

U;k;ky;] vklulksy ds iapkV ¼lanHkZ la[;k 15@1994½ dks izdkf'kr

djrh gS] tks dsUnzh; ljdkj dks 01@10@2015 dks izkIr gqvk FkkA

[lañ ,y&22012@169@1994&vkbZvkj ¼lh&II½]

jktsUnz flag] vuqHkkx vf/kdkjh

New Delhi, the 1st October, 2015

S.O. 1959.—In pursuance of Section 17 of the Industrial

Disputes Act, 1947 (14 of 1947), the Central Government

hereby publishes the Award (Ref. No. 15/1994) of the

Central Government Industrial Tribunal-cum-Labour Court,

Asansol as shown in the Annexure, in the industrial dispute

between the management of Narsamunda Colliery of M/s.

Eastern Coalfields Limited, and their workmen, received by

the Central Government on 01/10/2015.

[No. L-22012/169/1994-IR (C-II)]

RAJENDER SINGH, Section Officer

ANNEXURE

BEFORE THE CENTRAL GOVT. INDUSTRIAL

TRIBUNAL-CUM-LABOUR COURT,

ASANSOL

Present::

Sri Pramod Kumar Mishra,

Presiding Officer

REFERENCE NO. 15 OF 1994

Parties:

The management of Narsamuda Colliery of

M/s. ECL

Vs.

Sri Parmanand Singh

REPRESENTATIVES:

For the management:

Sri P.K. Das, Ld. Adv. (ECL)

For the union (Workman):

Sri N. Ganguly, Ld. Adv

INDUSTRY:

COAL

STATE:

WEST BENGAL

Dated:

03.09.2015

AWARD

In exercise of powers conferred by clause (d) of Sub-

section (1) and sub-section 2(A) of Section 10 of the

Industrial Disputes Act, 1947 (14 of 1947), Govt. of India

through the Ministry of Labour vide its letter No. L-22012/

169/1994-IR(C-II) dated 07.11.1994 has been pleased to refer

the following dispute for adjudication by this Tribunal.

SCHEDULE

"Whether the action of the management of

Narsamuda Colliery in not regularizing

Shri Parmanand Singh, Security Guard in the post of

Security Havildar w.e.f. 12.12.1985 is justified? If not

to what relief is the workman entitled to?"

Having received the Order No. L-22012/169/1994-IR(C-II)

dated 07.11.1994 of the above said reference from the Govt.

of India, Ministry of Labour, New Delhi for adjudication of

the dispute, a Reference Case No. 15 of 1994 was registered

on 25.07.1996 and accordingly an order to that effect was

passed to issue notices through the registered post to the

parties concerned directing them to appear in the court on

the date fixed and to file their written statements along with

the relevant documents and a list of witnesses in support

of their claims. In pursuance of the said order notices by

the registered post were sent to the parties concerned.

[Hkkx II—[k.M 3(ii)]

Hkkjr dk jkti= % vDrwcj 10] 2015@vkf'ou 18] 1937

4033

Case called out. Sri P.K. Das, Learned Advocate appears

on behalf of the management (ECL). Sri N. Ganguly, Learned

Advocate, who is also present for some other engagement,

submits that the case may be closed as he has no contact

with the workman/union for last five years.

On perusal of the case record I find that Sri Ganguly, Ld.

Adv. last appeared before the tribunal on 28.11.2007 on

behalf of the workman. Thereafter no one has turned up on

behalf of the workman. Registered notices were again

issued on 19.03.2009 and 19.03.2012 but no response. It

seems that the workman/union is now not all interested to

proceed with the case further. The case is of the year 1994.

As such the case is closed and accordingly a 'No Dispute

Award' may be passed.

ORDER

Let an "Award" be and same is passed as no dispute

existing. Send the copies of the order to the Govt. of India,

Ministry of Labour, New Delhi, for information and needful.

The reference is accordingly disposed of.

PRAMOD KUMAR MISHRA, Presiding Officer

ubZ fnYyh] 1 vDrwcj] 2015

dk-vk- 1960-—vkS|ksfxd fookn vfèfu;e] 1947 ¼1947

dk 14½ dh èkjk 17 ds vuqlj.k esa dsUnzh; ljdkj MCY;wlh,y ds

izcaèra= ds lac) fu;kstdksa vkSj muds deZdkjksa ds chp vuqcaè esa

fufnZ"V vkS|ksfxd fookn esa dsUnzh; ljdkj vkS|ksfxd vfèdj.k@Je

U;k;ky;] tcyiqj ds iapkV ¼lanHkZ la[;k 77@2001½ dks izdkf'kr

djrh gS] tks dsUnzh; ljdkj dks 01@10@2015 dks izkIr gqvk FkkA

[lañ ,y&22012@202@2000&vkbZvkj ¼lh&II½]

jktsUnz flag] vuqHkkx vf/kdkjh

New Delhi, the 1st October, 2015

S.O. 1960.—In pursuance of Section 17 of the Industrial

Disputes Act, 1947 (14 of 1947), the Central Government

hereby publishes the Award (Ref. No. 77/2001) of the

Central Government Industrial Tribunal-cum-Labour Court,

Jabalpur now as shown in the Annexure, in the industrial

dispute between the management of Mahadeopuri Mine

of Western Coalfields Limited, and their workmen, received

by the Central Government on 01/10/2015.

[No. L-22012/202/2000-IR (C-II)]

RAJENDER SINGH, Section Officer

ANNEXURE

BEFORE THE CENTRAL GOVERNMENT

INDUSTRIAL TRIBUNAL-CUM-LABOUR

COURT, JABALPUR

No. CGIT/LC/R/77/2001

Shri Sabir Khan,

S/o Habibulla,

Ex. D.P.R. of Mahadeopuri Colliery,

Chief House, Chandametta,

Distt Chhindwara (MP)

....Workman

Versus

The Manager,

Mahadeopuri Mine of WCL,

PO Parasia,

Distt, Chhindwara (MP)

.....Management

AWARD

Passed on this 4th day of September, 2015

1. As per letter dated 12-4-2001 by the Government of

India, Ministry of Labour, New Delhi, the reference is

received. The reference is made to this Tribunal under

Section -10 of I.D. Act, 1947 as per Notification

No. L-22012/202/2000-IR(C-II). The dispute under reference

relates to:

"Whether the action of the CME/Sub Area Manager,

Newton Sub Area of WCL, PO Parasia, Distt.

Chhindwara (MP) in dismissing the services of

Shri Sabir Khan S/o Habibulla, DPR of Mahadeopuri

Mine of WCL, PO Parasia, Distt. Chhindwara (MP)

w.e.f. 1-11-99 is justified? If not, to what relief the

workman is entitled to?"

2. After receiving reference, notices were issued to the

parties, Workman submitted statement of claim At Page 2/

1 to 2/3. Case of workman is that he was appointed

on 12-8-81 as DPR at Mahadeopuri Mine, pench area.

Chargesheet issued to him on 30-9-99. Management illegally

charged him though he was not involved in incident of

violence and destruction of property. Bharat Singh Sakrawar

was his Defence Assistant was not present 13-9-99 in the

enquiry. Enquiry Officer under pressure of management

proceeded exparte against workman in enquiry. Workman

was dismissed on 29-10-99. Order of punishment was not

issued by Competent Authority. His Appointing Authority

is General Manager. The Separate Order was issued by

Sub Area Manager. On such ground workman prays for his

reinstatement.

3. 2nd party filed Written Statement at Page 7/1 to 7/6

opposing claim of the workman. 2nd party submits that

workman was initially appointed as departmental piece

rated employee at Shivpuri underground mine. He was

transferred to Mahadeopuri mine as DPR. Complaint was

received against workman on 1-9-99 from Abdul Hameed,

chargesheet was issued to workman on 3-9-99 for

misconduct under cause 26.23, 26.27 of standing order

pertaining to causing wilful damage to the work, conduct

within mine premises engangering life and safety of others.

Enquiry was conducted on various dates. On 13-9-99,

request for adjournment was rejected and evidence of

management's witness was recorded. Enquiry Officer held

charges against workman proved. Workman was dismissed

as per order dated 19-10-99. 2nd party reiterates that the

4034

THE GAZETTE OF INDIA : OCTOBER 10, 2015/ASVINA 18, 1937

[PART II—SEC. 3(ii)]

enquiry was properly conducted following principles of

natural justice. The dismissal of workman is proper and

legal.

4. Enquiry conducted against workman is found vitiated

as per order dated 13-12-12. Management was permitted to

prove misconduct by leading evidence.

5. Considering pleadings on record, the points which

arise for my consideration and determination are as under.

My findings are recorded against each of them for the

reasons as below:—

(i)

Whether the charges against

In Negative

workman are proved by 2nd

party?

(ii)

Whether the punishment of

In Negative

dismissal imposed against

workman is proper and legal?

(ii)

If not, what relief the

As per final order.

workman is entitled to?"

REASONS

6. As discussed above, enquiry conducted against

workman is found illegal. Management was permitted to

prove misconduct adducing evidence. I may mention that

the documents related to enquiry are produced at Exhibit

W-1 to W-7. Copy of Judgment of Criminal court is

produced, workman was acquitted.

7. Management has also produced documents of

enquiry. The discussion of documents of enquiry is not

required as enquiry is found vitiated. Management is order

to prove charges alleged against workman, management

examined witness Shri Abdul Hameed. He has not

supported any charges alleged against workman. The

complaint was read over to him. Witness of management

only admitted his signature, the complaint is marked Exhibit

M-2 but he says its contents are false. Chargesheet exhibit

M-3 was also explained to the witness. Management's

witness says the charges are false. He admits his signature.

No other witness is examined by management to prove the

charges. From evidence on record, charges alleged against

workman cannot be proved therefore I record my finding in

Point No. 1 in Negative.

8. As charges alleged against workman are not proved,

the order of punishment of dismissal cannot be sustained

therefore I record my finding in Point No. 2 in Negative.

9. Point No. 3-In view of my finding in Point No. 1,2

charges alleged against workman are not proved, order of

his dismissal cannot be sustained, question remains for

consideration is whether workman is entitled for

reinstatement with backwages.

Shri A.K. Shashi learned counsel for 2nd party on the

point relies on part held in case of Jaipur Golden Transport

Company Ltd. vrs Munna Khan Dost Khan Mohammad

and another reported in 2000(1)LLN 955. Their Lordship

setaide the order of reinstatement by Labour Court and

instead compensation Rs. 1,90,000 was allowed. The facts

of present case are not comparable as in Para-9 of the above

cited judgment, their Lordship observed that it is not

possible to agree with the view taken by the Labour court

merely because the workmen who instigated the assault

and damage to the company's property were standing

outside the premises of the company. The workman has

completed 58 years.

In present case, the age of workman is shown 45 years

in his affidavit of evidence filed on 30-11-09. The age of

workman may be about 51 years. The charges against

workman are not proved therefore punishment of dismissal

is illegal. As charges are not proved, workman deserved

reinstatement with backwages. Accordingly I record my

finding in point No. 2.

10. In the result, award is passed as under:—

(1) The action of the CME/Sub Area Manager, Newton

Sub Area of WCL, PO Parasia, Distt. Chhindwara

(MP) in dismissing the services of Shri Sabir Khan

S/O Habibulla, DPR of Mahadeopuri Mine of

WCL, PO Parasia, Distt. Chhindwara (MP) w.e.f.

1-11-99 is not proper.

(2) 2nd party is directed to reinstate workman with

continuity of service with backwages.

R.B. PATLE, Presiding Officer

ubZ fnYyh] 5 vDrwcj] 2015

dk-vk- 1961-—vkS|ksfxd fookn vf/kfu;e] 1947 ¼1947

dk 14½ dh /kkjk 17 ds vuqlj.k esa dsUnzh; ljdkj mÙkj jsyos ds

izca/kra= ds lac) fu;kstdksa vkSj muds deZdkjksa ds chp vuqca/k esa

fufnZ"V vkS|ksfxd fookn esa dsUnzh; ljdkj vkS|ksfxd vf/kdj.k]

y[kuÅ ds iapkV ¼lanHkZ lañ 24@2010½ dks izdkf'kr djrh gS] tks

dsUnzh; ljdkj dks 05@10@2015 dks izkIr gqvk FkkA

[lañ ,y&41011@117@2009&vkbZvkj ¼ch&I½]

lqefr ldykuh] vuqHkkx vf/kdkjh

New Delhi, the 5th October, 2015

S.O. 1961.—In pursuance of Section 17 of the Industrial

Disputes Act, 1947 (14 of 1947), the Central Government

hereby publishes the Award (Ref. No. 24/2010)) of the

Central Government Industrial Tribunal-cum-Labour Court,

Lucknow as shown in the Annexure in the Industrial Dispute

between the management of Northern Railway and their

workmen, received by the Central Government on

05/10/2015.

[No. L-41011/117/2009-IR (B-I)]

SUMATI SAKLANI, Section Officer

[Hkkx II—[k.M 3(ii)]

Hkkjr dk jkti= % vDrwcj 10] 2015@vkf'ou 18] 1937

4035

ANNEXURE

CENTRAL GOVERNMENT INDUSTRIAL TRIBUNAL-

CUM-LABOUR COURT, LUCKNOW

PRESENT

Shri Rakesh Kumar, Presiding Officer

I.D. No. 24/2010

Ref. No. L-41011/117/2009-IR (B-I) dated: 09.11.2010

BETWEEN

Mandal Sangatan Mantri

Uttar Railways Karmchari Union

283/63. Kh Gadi Kannora

PO Manak Nagar

Lucknow

(Espousing cause of Shri Ram Chander)

AND

1. Dy. Chief Engineer (Construction)

Uttar Railway, Charbagh

Lucknow.

2. Deputy Chief Manager (Stores)

Northern Railway, Stores Depot

Alambagh, Lucknow.

AWARD

1. By order No. L-41011/117/2009-IR (B-I) dated:

09.11.2010 the Central Government in the Ministry of

Labour, New Delhi in exercise of powers conferred by clause

(d) of sub section (1) and sub section (2A) of Section 10 of

the Industrial Disputes Act, 1947 (14 of 1947) referred this

industrial dispute between Mandal Sangathan Mantri, Uttar

Railways Employee Union, 283/63, Kh Gadi Kannora, PO.

Manak Nagar, Lucknow and the Dy. Chief Engineer

(Construction), Uttar Railway, Charbagh, Lucknow &

Deputy Chief Manager (Stores), Northern Railway, Stores

Depot, Alambagh, Lucknow to this CGIT-cum-Labour

Court, Lucknow for adjudication.

2. The reference under adjudication is:

"Whether the Action of Management of North

Central Railway, Allahabad/Kanpur in not giving Shri

Ram Chander, T.No. 449 Status of Temporary Worker

from the date of Completion of 120 days of service is

Legal and Justified? What relief the workman is

Entitled to?"

3. The case of the workman's union, in brief, is that the

workman, Ram Chander, has been engaged as casual labour

with in construction unit under opposite party No. 1 and is

presently working under opposite party No. 2. It has been

alleged by the workman's union that the workman under

dispute was to be given temporary status after completion

of 120 days of working as per P.S. N. 7850, Master Circular

48/92 and Rule 2304, 2501 and 2511 of Indian Railway

Establishment Manual; but they were granted temporary

status after five year's of their engagement, which is not

only unfair labour practice but also is against Article 21 of

the Constitution. Accordingly, the workman's union has

prayed that the workmen concerned be granted temporary

status from the date they have completed 120 days' working

with consequential benefits.

4. The management of the North Central Railways has

filed its written statement denying the allegations of the

workman's union with submission that the workman under

dispute was initially engaged by them as Project Casual

Labour in Construction Unit with intermittent gap w.e.f

24.04.79 and has been granted temporary status on 01.01.85

vide letter No.220/E/3/Recruit dated 22/25.02.85. It has been

submitted that the railway formulated a scheme to provide

the temporary status to Project Casual Labour, circulated

vide No. E(NG)II/84/CL/41 dated 1.6.84 as per directions of

Hon'ble Apex Court in Inder Pal Yadav & other vs Union

of India & others (1985) 2 SCC 648. The management

has submitted that as per modified date of grant of

temporary status, the workmen were screened and posted

as Gangman and is in fruitful employment of the opposite

party for last 20 years, thus raising the present industrial

disputes after lapse of 20 long years makes it time barred

hence, not maintainable in the eye of law. It is specifically

submitted by the management that the workman has been

engaged as project casual labour and as per existing

Railway Rules 360 days' continuous service is required for

grant of temporary status, therefore, the claim of the

workman for grant of temporary status after 120 days is not

maintainable and liable to be rejected. Accordingly, the

management has prayed that the claim of the workman's

union be rejected being devoid of any merit.

5. The workman's union has filed its rejoinder wherein

apart from reiterating facts already mentioned in the

statement claim has submitted that the workman under

dispute has not appointed in any project, therefore decision

of Hon'ble Apex Court in Inder Pal Yadav case (supra) is

not applicable on him and he should be granted temporary

status after completion of 120 days of service.

6. The workman's union has not filed any documentary

evidence in support of its claim; rather it has stated that

the Casual Labour Card in respect of the workman and his

Service Book, is with the employers, in original.

The management has filed photocopy of Casual Labour

Card and Service Book in respect of workman.

7. The Workman's union has examined workman;

whereas the management examined Sri Sita Ram Sonkar,

APO in support of their claim. The parties availed

opportunity to corss-examine the each other's witnesses

apart from putting oral arguments as well as written

arguments.

8. Heard learned authorized representatives of the parties

and perused entire evidence on record.

9. The authorized representative of the workman has

contended that the workman was not project casual labour;

rather he was casual labour engaged in construction

division/unit. Therefore, he was eligible for grant of

4036

THE GAZETTE OF INDIA : OCTOBER 10, 2015/ASVINA 18, 1937

[PART II—SEC. 3(ii)]

temporary status from the date he completed 120 days of

service. The railway administration instead treated him as

project casual labour and granted him temporary status

after lapse of five years which is unfair labour practice. It is

also contended that the decisions of the Hon'ble Supreme

Court in Indra Pal Yadav case (supra) is not applicable on

the workman. The workman's union has relied on:

(i) Union of India vs. Presiding Officer, CGIT-cum-

Labour Court, Kanpur Nagar & another 2008

(116) FLR 1046.

(ii) Union of India & others vs. Basant Lal & others

1992 SCC (L&C) 611.

(iii) L. Rebert D'Souza vs Executive Engineer,

Southern Railway & another 1982 SCC (L&S)

124.

(iv) N. Balakrishnan vs. M. Krishnamurthy ACJ 1998

1347 SC.

(v) Kuldeep Singh vs. GM. Instrument Design

Development and Facilities Centre & another

2011 (128) FLR 121.

(vi) Din Mohammed (Dead) by LRs. Vs Union of India

& others 2002 (92) FLR 1216.

(vii) The Union of India & another vs Girja Shankar

& others 2003 (96) FLR 1094.

10. In rebuttal, the authorized representative of the

management has contended that the workman has been

project casual labour in construction unit and worked with

intermittent gap and he was granted temporary status as

per Railway Board's letter dated 01.06.84. It has been

submitted that the Railway Board vide its letter dated

11.09.86 modified the date of temporary status to the

workmen in view of decision given by Hon'ble Supreme

Court in Indra Pal Yadav case (supra). The management

has contended that the workman was not entitled for grant

of temporary status after completion of 120 days

continuous service since he was engaged as project casual

labour and as per existing Railway Rules, 360 days'

continuous services is required for grant of temporary status

to a project casual labour.. The authorized representative

of the management has also contended that the workman

has turned up after lapse of more than 20 years and his

cause is not tenable in the eye of law being time barred.

The management has relied on Inder Pal Yadav & others

Vs. Union of India (1985) 2 SCC 648.

11. I have given my thoughtful consideration to the

rival submissions of the learned authorized representativs

of the parties and scanned entire evidence on record in

light thereto.

12. The workman has come up with a case that he has

been engaged as casual labour in the Construction Unit of

the Dy. Chief Engineer (Construction), Northern Railway,

Lucknow and he was entitled for grant of temporary status

on completion of 120 days of service under P.S.N. 7850,

Master Circular 48/92 and Rule 2304, 2501 and 2511 of Indian

Railway Establishment Manual; but the management

granted him temporary status after five years' of their

appointment, amounting to unfair labour practice. The

workman's union has not filed any documentary evidence

in support of their case; rather it has pleaded that the same

is in power and possession of the Railways.

13. The management of the Northern Railways, rebutting

the claim of the workman's union has come up with a clear

cut case that the workman had been engaged as Project

Casual Labour and accordingly, he was entitled for grant

of temporary status on completion of 360 days continuous

service; and accordingly, he was grated vide Railway

Board's letter dated 01.06.84. Later on with decision of

Hon'ble Apex Court in Inder Pal Yadav case (supra), the

date of grant of temporary status was modified vide

Railways Board's letter dated 11.09.86 whereby the

workman were given temporary status from previous date.

The management has also stressed upon the factum of

delay in raising the present industrial dispute after lapse of

more than 20 years. The authorized representative of the

management has pointed out that the workman is working

with the railways for decades; but neither he preferred any

representation, on the issue; nor moved to the court for

redressal of his grievances. It is also stressed by the

management that the workman has raised the present

industrial dispute at a highly belated stage without any

explanation to the delay. It has also been argued that though

there is no limitation in the I.D. Act, 1947; but the same

should not be condoned for the want of any explanation

from the workman's union. He has also submitted that the

Hon'ble Apex Court in number of its verdicts has observed

that Courts should exercise their discretion, judiciously,

while condoning the delay.

14. The workman's union adduced evidence of the

workman who stated in his cross-examination that he had

appointed as casual labour in 15.03.1974 and he was granted

temporary status w.e.f. in 13.12.82. The workman admitted

the photocopy of service record and casual labour card,

filed by the management, from paper No. 8/1 to 8/3 & 6/7 to

6/8.

15. The workman has not filed any documentary proof

in support of their claim but has relied on the photocopy of

the service record and casual labour card of the workman,

filed by the management. The service record of the workman

shows the entry regarding grant of temporary status to the

workman of different dates and there after grant of revised

temporary status from different dates as per Railway Board's

circular dated 11.9.86. The photocopy of the casual labour

card, filed by the management has details regarding working

of the workman with permanent Way Inspector

(Construction) at different-different stations.

Thus, both the parties have relied on the same set of

documents in support of their different stands.

16. After going through the rival pleadings of the parties

and documentary and oral evidence relied upon by the

parties the bone of contention is as to whether the workman

was Project casual labour or just casual labour engaged in

[Hkkx II—[k.M 3(ii)]

Hkkjr dk jkti= % vDrwcj 10] 2015@vkf'ou 18] 1937

4037

the railway administration. Had they been Project Casual

Labour then the action of the management was right and if

they were casual labour on the rolls of railways then they

ought to have been granted temporary status on

completion of 120 days continuous service.

The burden that lied upon the workman's union was to

come with the evidence that the workman was engaged as

casual labour and he completed 120 days continuous service

on this particular date, making him entitled for grant of

temporary status. Thus, it was for the workman's union to

lead its evidence on two points firstly that the workman

was engaged as Casual Labour and secondly that he

completed 120 days' of continuous working on such and

such date. But the workman failed to comply with the above

requirement. As it relied on the documentary evidence i.e.

casual labour card which was in power and possession of

the management for working details; but when the

management filed the photocopy of the same then it neither

calculated the 120 days' of continuous working from it nor

disputed its genuineness. This goes to upheld the stand

taken by the management that the workman was Project

Casual Labour and accordingly he was granted temporary

status on completion of 360 days of continuous working

vide Railway Board's letter dated 01.06.84 and thereafter

granted them revised temporary status from a back date

vide letter dated 11.09.86 as per guidelines of Hon'ble Apex

Court.

17. The workman has relied on Union of India vs.

Presiding Officer, CGIT-cum-Labour Court, Kanpur Nagar

& another which pertains to termination of services of a

workman in violation of provisions of Section 25F, G & H

of the Act. However, the facts of the present case are entirely

different; hence not applicable in the present case. The

workman has also relied on Union of India & Others Vs.

Basant Lal & others 1992 SCC (L&S) 611; wherein the

Hon'ble Apex Court has held that workman having

completed 120 days of working becomes entitled for

regularization as temporary worker and the Railway cannot

deny them the temporary status on the ground that they

had been appointed as causal labour on a project work and

not on construction work on open line and as such would

acquire the temporary status only after completing 360 days

of service. But in the present the workman's union failed to

specify the date when the different workmen completed

120 days' of continuous service, rendering them for grant

of temporary status. The workman's union has also relied

on L. Robert D'Souza vs Executive Engineer, Southem

Railway & another 1982 SSC (L&S) 124 but the fact of the

case law in entirely different from the present case hence

not applicable. Likewise the facts of the case law relied

upon by the workman in the Union of India & another Vs.

Girja Shankar & others 2003 (96) FLR 1094, Kuldeep Singh

Vs GM Instrument Design Development and Facilities

Centre & another 2011 (128) FLR 123 and Din Mhammaed

(Dead) by LRs. Vs. Union of India & others 2002 (992) FLR

1216 are quite different from the facts of the present case

hence not appreciable.

18. It is well settled that if a party challenges the legality

of an action, the burden lies upon him to prove illegality of

the action; and if not evidence is produced, the party

invoking jurisdiction of the court fail. In the present case

burden was on the workman's union to set out the grounds

to challenge the validity of the action of the management

in not granting the temporary status to the workman after

completion of 120 days' of continous working. For this the

burden of proof was on the workman's union to come with

the evidence, that the workman under dispute has been

engaged by the management of Railways as casual labour

and under rules they were entitled for grant of temporary

status from completion of 120 days services with the

employers; but the workman's union has failed to discharge

the burned that lied upon them. The workman's union made

a pleading, to explain the reason why it is not in position to

file any documentary evidence before this Tribunal, in their

statement of claim of the effect that the relevant document

in support of their claim i.e. Casual Labour Card is attached

in their Service Book. The workman's union in its rejoinder

required the management to produce Casual Labour Card

in respect of the workman before this Tribunal, resultantly,

the management filed photocopy of Casual Labour Card

and Services Book in respect of the workman. The

workman's union did not dispute the service details filed

by the management i.e. Casual Labour Card and extracts of

Service Book. Therefore, when the management has filed

the photocopy of Casual Labour Card as desired by the

workman's union then it was incumbent upon the

workman's union to come forward and sort out the relevant

extract of the Casual Labour Card, which bears working

details i e. working period and number of days, to show

that the workman completed 120 days of continuous on

such and such date and he was entitled for grant of

temporary status from such date. But the workman has

utterly failed to bring any evidence to the effect before this

Tribunal that the workman was engatged as Causal Labour

and that the workman was casual labour and it also failed

to specify the date as to when the workman completed 120

days' of continuous working, making him eligible for grant

of temporary status.

19. On the contrary the management has come with a

clear cut case that the workman was engated as Project

Casual Labour with Construction Union. It is also

contended by the learned authorized representative of

opposite party that there are so many projects which go on

with the Construction Unit and the workmen were kept

engaged in different Projects. It is also specifically pleaded

and proved by the management that the workman was

granted temporary status vide Railway Board's letter dated

01.06.84; but due to supreme Court's direction in Indra Pal

Yadav Case (supra), the Railway Board vide its letter dated

11.09.86; changed the date of grant of temporary status, as

per modified policy and accordingly, reduced the date of

Temporary Status through notice. The management has

filed photocopy of Service Record in respect of workman,

which bears entries regarding grant of temporary status to

the workman.

4038

THE GAZETTE OF INDIA : OCTOBER 10, 2015/ASVINA 18, 1937

[PART II—SEC. 3(ii)]

20. The management has made a specific pleading to

the effect that the claim of the workman's union is stale one

and time barred as the union has preferred the case before

this Tribunal after lapse of more than 20 years. The

workman's union in rebuttal has submitted that there is no

provision regarding limitation in the Industrial Disputes

Act, 1947; hence their claim is maintainable.

In this regard the workman's union has relied

on N. Balakrishnan Vs M. Krishnamurthy 1998 ACJ 1347;

wherein Hon'ble Apex Court while dealing with the matter

delay has observed that length of delay does not matter,

acceptability of the explanation is the only criterion. But

the workman's union has not given any explanation in its

pleadings as to what prevented them to raise an industrial

dispute at an early state. However, in the evidence it has

been stated that the workman/union wrote many letters to

the opposite parties and the same are pending with them;

although no copy of such letter/reprsentation finds its

reference either on record or annexure with the affidavit.

Moreover, the management witness vide para 9 of his

affidavit has denied of submissions of any such application

by the workman.

In Chennai Metropolitan Water Supply and Sewerage

Board & other Vs T.T. Murali Babu 2014 (141) FLR 772,

Honble Apex Court has observed as under:

"The Court should bear in mind that it is exercising

an extraordinary and equitable jurisdiction. As a

Constitutional Court it has a duty to protect the rights

of the citizens but simultaneously it is to keep itself

alive to the primary principle that when an aggrieved

person, without adequate reason, approaches the

court at his won leisure or pleasure, the court would

be under legal obligation to scrutinize whether the

lis at a belated stage should be entertained or not. Be

it noted, delay comes in the way of equity. In certain

circumstances delay and laches may be fatal but in

most circumstances inordinate delay would only

invite disaster for the litigant who knocks at the doors

of the Court. Delay reflects inactivity and inaction

on the part of a litigant-a litigant who has forgotten

the basic norms, namely, "procrastination is the

greatest thief to time" and second, law does not permit

one to sleep and rise like a phoenix. Delay does bring

a hazard and causes injuury to the lis. In the case at

hand, though there has been four years' delay in

approaching the Court, yet the writ Court chose not

to address the same. It is the duty of the Court to

scruitinize whether such enormous delay is to be

ignored without any justification."

Further, In Dr. Jawahar Lal Rohatgi Memorial Eye

Hospital vs State of U.P. & others 2013 (138) FLR 11 Honble

Allahabad High Court upholding the action of the State

Government in denying the making reference of case after

22 years held that it is not expedient for State government

to refer order of temination dated 26.6.1982 being old and

stale case, where the workman filed an application raising

industrial dispute after 22 years in 2004. Hon'ble High Court

observed that there is nothing to indicate as to why the

workman could not approach the authority under the ID

Act.

Thus, from the face of record it is crystal clear the

workman did not bother to approach the management or

any legal forum for redressal of his grievances for more

than 20 years; and the explanation forwarded by the

workman's union before this Tribunal is unsufficient.

21. Hence, from the facts and circumstances of the case

and law cited hereinabove; I am of considered opinion that

the action of the management of Northern Railway, Lucknow

in not giving temporary status to the workman, Shri Ram

Chander, from the alleged date of completion of 120 days

of service is neither illegal nor unjustified. Accordingly, I

come to the conclusion that the workman's union is not

entitled to any relief.

22. The reference under adjudication is answered

accordingly.

23. Award as above.

LUCKNOW.

22nd September, 2015

RAKESH KUMAR, Presiding Officer

ubZ fnYyh] 5 vDrwcj] 2015

dk-vk- 1962-—vkS|ksfxd fookn vfèfu;e] 1947 ¼1947

dk 14½ dh èkjk 17 ds vuqlj.k esa dsUnzh; ljdkj mÙkj jsyos ds

izcaèra= ds lac) fu;kstdksa vkSj muds deZdkjksa ds chp vuqcaè esa

fufnZ"V vkS|ksfxd fookn esa dsUnzh; ljdkj vkS|ksfxd vfèdj.k]

y[kuÅ ds iapkV ¼lanHkZ la[;k 41@2011½ dks izdkf'kr djrh gS]

tks dsUnzh; ljdkj dks 05@10@2015 dks izkIr gqvk FkkA

[lañ ,y&41011@110@2010&vkbZ vkj ¼ch&1]

lqefr ldykuh] vuqHkkx vf/kdkjh

New Delhi, the 5th October, 2015

S.O. 1962.—In pursuance of Section 17 of the Industrial

Disputes Act, 1947 (14 of 1947), the Central Government

hereby publishes the Award (Ref. No. 41/2011) of the

Central Government Industrial Tribunal-Cum-Labour Court,

Lucknow as sown in the Annexure, in the industrial Dispute

between the management of Northern Railway and their

workman, received by the Central Government on

05/10/2015.

[No. L-41011/110/2010-IR (B-1)]

SUMATI SAKLANI, Section Officer

ANNEXURE

CENTRAL GOVERNMENT INDUSTRIAL TRIBUNAL-

CUM-LABOUR COURT, LUCKNOW

PRESENT

Rakesh Kumar, Presiding Officer

I.D. No. 41/2011

Ref. No. L-41011/110/2010-IR(B-1) dated: 14.03.2011

[Hkkx II—[k.M 3(ii)]

Hkkjr dk jkti= % vDrwcj 10] 2015@vkf'ou 18] 1937

4039

BETWEEN

Mandal Sangthan Mantri

Uttar Railway Karmchari Union

283/63 Kh, Garhi Kananora (Premwati Nagar)

PO-Manak Nagar

Lucknow-16

(Espousing cause of Shri Hira Lal)

AND

Senior Divisional Railway Manager (Personnel)

Northern Railway, Hazratganj

Lucknow

AWARD

1. By Order No. L-41011/110/2010-IR(B-1) dated:

14.03.2011 the Central Government in the Ministry of

Labour, New Delhi in exercise of powers conferred by clause

(d) of sub-section (1) and sub-section (2A) of Section 10 of

the Industrial Disputes Act, 1947 (14 of 1947) referred this

industrial dispute between Mandal Sangthan Mantri, Uttar

Railway Karmchari Union, 283/63 Kh, Garhi Kananora

(Premwati Nagar), PO— Manak Nagar, Lucknow and Senior

Divisional Railway Manager (Personnel), Northern Railway,

Hazratganj, Lucknow for adjudication to this CGIT-cum-

Labour Court, Lucknow.

2. The reference under adjudication is:

‘‘Whether the demand of the Union regarding placing

Shri Hira Lal S/o Shri Kamla Prasad, Assistant Loco Pilot,

Loco-shed, Lucknow in the Penal of 1983-84 above his

Juniors and grant of pay benefits accordingly is legal and

justified? To what relief the union is entitled?"

3. The case of the workman's union, in brief, is that the

workman, was appointed as cleaner w.e.f. 12.10.1979 and

worked as such till 03.09.1981 continuously, when he had

been retrenched w.e.f. 04.09.1981 illegally. The workman

challenged his retrenchment before CGIT-cum-Labour

Court, Kanpur in I.D. No. 48/83 and 163/1983 and the

Tribunal was pleased to reinstate the workman with back

wages from the date of retrenchment vide their award dated

19.02.1987 and 25.11.1985. The management challenged the

award of CGIT, Kanpur before Hon'ble High Court, which

was rejected; likewise the SLP too before Hon'ble Apex

Court was rejected; accordingly, the workman was

reinstated on 03.08.1983. It is alleged that the management

vide its order No. 220 E/1-5/Screening/Loco dated 30.08.1991

regularized the workman on the post of Loco Cleaner;

whereas it absorbed other junior workmen in the panel for

the year 1983-84 on the basis of 120 days working up to

30.09.1981, which is in violation to the provisions of Railway

Rules. It is submitted by the workman's union that

Shri Amarjeet Singh & Sri Abdul Aziz were also included in

the panel for year 1992 but later on included in the panel of

year 1983-84 on the orders of Hon'ble CAT, Lucknow.

Likewise, other workmen viz. Shri Pratap Bahadur & Ahmad

Ali, who were earlier included in panel for the year 1992

were included in the panel for year 1983-84 as per order of

this Tribunal. Accordingly, the workman's union has prayed

that the name of the workman, be included in the panel of

the year 1983-84 which consequential benefits.

4. The management of the railways has filed its written

statement, denying the claim of the workman's union and

has contended that the workman's union has sought the

relief placing the name of the workman in the panel of year

1983-84, which is not permissible because of the seniority

of other employees will be effected and they are not arrayed

as party in present industrial dispute and if the relief is

granted, several other workers may prefer the matter in

courts since their seniority shall be affected. The

management has specifically submitted that the industrial

dispute has been referred after lapse of more than 25 years

without any rhyme or reason or any sufficient explanation;

and accordingly, the same is liable to be rejected on the

point of limitation.

5. The workman's union has filed its rejoinder wherein

apart from reiterating facts already mentioned in the

statement claim has submitted that there is no limitation

provided in the industrial disputes Act, 1947.

6. The parties filed documentary as well as oral evidence

in support of their respective case and forwarded oral

arguments.

7. Heard learned authorized representatives of the parties

at length and perused entire evidence on record.

8. The authorized representative of the workman has

contended that since the termination dated 04.09.81 has

been held illegal and the workman had been reinstated

with consequential benefits, therefore he is entitled for

inclusion in the panel of year 1983-84. He has relief upon:

(i)

N. Balakrishnan vs. M. Krishnamurthy 1998 ACJ

1347.

9. In rebuttal, the authorized representative of the

management has contended that the workman was screened

and rightly placed in the seniority panel vide order dated

30.08.1991. The management has vehemently contended

that the workman is not entitled to be included in the panel

for the year 1983-84, in as much as the present industrial

dispute is time barred and the workman has raised this

industrial dispute when he found that some other workmen

got benefit from different Court/Tribunals. The

management has relief on:

(i)

M. Ramakotaiah & Others vs. Union of India &

Others 2007 (6) AWC 6556 (SC).

10. I have given my thoughtful consideration to the

rival contentions of the learned authorized representatives

of the parties and scanned the entire evidence available on

record.

11. Admittedly, the workman had been terminated w.e.f.

04.09.1981 and his termination had been declared to be

illegal and was reinstated with back wages by the CGIT-

cum-Labour Court, Kanpur. Also, the Hon'ble High Court

in writ petition, filed by the management of railways, upheld

4040

THE GAZETTE OF INDIA : OCTOBER 10, 2015/ASVINA 18, 1937

[PART II—SEC. 3(ii)]

the award regarding reinstatement and the management in

compliance of award reinstated the workman and paid him

back wages. However, the management's contention over

the issue referred to this Tribunal is, that the workman was

screened and was rightly placed in the seniority panel for

1991 and he is not entitled for inclusion in the panel for

year 1983 as he was not in service at that point of time;

more so because the present industrial dispute has been

raised after lapse of more than 25 years.

12. Thus, the question to be adjudicated is as to whether

the workman is entitled to be included in the seniority panel

of 1983-84 which was denied to him, consequent upon his

termination in the said year? It is admitted fact that the

workman was not in service due to illegal termination in the

relevant year 1983, when the seniority panel was drawn

and his name was not considered. The termination of the

workman was quashed by the CGIT-cum-Labour Court,

Kanpur and in compliance thereof the management

reinstated the workman, treating the termination as non-

est and paid back wages in compliance of the order of the

Hon'ble High Court.

As per award of the CGIT-cum-Labour Court, Kanpur,

the reinstatement order was not qualified one to be given

effect to the extent of monetary benefits only. As per settled

procedure, logically and legally reinstatement required grant

of all service benefits including seniority as if the

termination had not taken place. The management complied

with the order of reinstatement without giving seniority

and released monetary benefits to the workman. On the

quashing of termination order, it has to be assumed that

the workman was never been terminated and continued to

be in service notionally. The effect of the reinstatement is

that the workman, would be deemed in service on the last

post held on the date of termination. Accordingly, he is

entitled for preference over his juniors and to be included

in the seniority panel for the year 1983-1984.

13. The management of the railways has come up with a

contention that the present industrial dispute is time barred

as it has been raised after lapse of more than 25 years. The

workman's witness during his cross-examination stated that

he moved an application before DRM; but has not filed its

copy before this Tribunal. He further, stated that when the

management did not act upon his repeated representations,

then he raised the present industrial dispute. The authorized

representative has contended that the workman has not

given any reliable explanation for inordinate delay of

25 years; rather he turned up when the other got successful.

He stressed that the order of the Hon'ble CAT, Lucknow

Bench, Lucknow in respect of Amarjeet Singh was delivered

on 26.04.1993; but the workman has raised present industrial

dispute in 2011, without any explanation.

14. The management has relief upon N. Balakrishnan

Vs. M. Krishnamurthy 1998 ACJ 1347; wherein Hon'ble Apex

Court while dealing with the matter of delay has observed

that length of delay does not matter, acceptability of the

explanation is the only criterion.

In Chennai Metropolitan Water Supply and Sewerage

Board & Other T.T. Murali Babu 2014 (141) FLR 772, Hon'ble

Apex Court has observed as under:

"The Court should bear in mind that it is exercising an

extraordinary and equitable jurisdiction. As a Constitutional

Court it has a duty to protect the rights of the citizens but

simultaneously. It is to keep itself alive to the primary

principle that when an aggrieved person, without adequate

reason, approaches the Court at his own leisure or pleasure,

the Court would be under legal obligation to scrutinize

whether the list at a belated stage should be entertained or

not. Be it noted, delay comes in the way of equity. In certain

circumstances delay and laches may be fatal but in most

circumstances inordinate delay would only invite disaster

for the litigant who knocks at the doors of the Court. Delay

reflects inactivity and inaction on the part of a litigant—a

litigant who has forgotten the basic norms, namely,

"procrastination is the greatest thief of time" and second,

law does not permit one to sleep and rise like a phoenix.

Delay does bring a hazard and causes injury to the lis. In

the case at hand, though there has been four years' delay

in approaching the Court, yet the writ Court chose not to

address the same. It is the duty of the Court to scrutinize

whether such enormous delay is to be ignored without any

justification."

Further, in Dr. Jawahar Lal Rohatgi Memorial Eye

Hospital Vs. State of U.P. & Others 2013 (138) FLR 11

Hon'ble Allahabad High Court upholding the action of the

State Government in denying the making reference of case

after 22 years held that it is not expedient for State

Government to refer against order of termination dated

26.6.1982 being old and stale case, where the workman

filed an application raising industrial dispute after 22 years

in 2004. Hon'ble High Court observed that there is nothing

to indicate as to why the workman could not approach the

authority under the ID Act. On the issue of delay the

workman has tried to explain his delay by pleading that he

kept on making representations before the authorities; but

in the absence of any copy thereof his contention cannot

be relied upon. There is no other explanation about delay.

Thus, from the face of record it is crystal clear that the

workman did not bother to approach the management of

any legal forum for redressal of his grievances for more

than 20 years; and he approached this Tribunal when he

come to know about favourable order of courts in similar

nature of cases, which points out towards opportunitism

of the workman. Moreover, the explanation forwarded by

the workman's union before this Tribunal is insufficient.

15. In the present case, admittedly there is delay of

approximately 20 years as he was screened vide order dated

30.08.1991. The workman's union failed to give any logical

explanation for this inordinate delay of 20 years. Hon'ble

Apex Court in Ajaib Singh Vs. Sirhind Co-operative

Marketing-cum-Processing Services Society Ltd. &

Another 1999 LAB IC 1435 where there was admitted delay

of seven years has held that the Court can mould relief by

refusing back wages or directing payment of part of back

wages.

¹Hkkx IIó[k.M 3(ii)º

Hkkjr dk jkti=k % vDrwcj 10] 2015@vkf'ou 18] 1937

4041

16. Thus, from the facts and circumstances of the case

and the case laws cited hereinabove, I am of considered

opinion that the action of the management of Central

Railway in not including the name of the workman in the

panel for year 1983-84 was illegal and unjustified.

Accordingly, I come to the conclusion that the workman,

Sri Hira Lal is entitled for placement in the panel of 1983-

1984 above his juniors, subject to his suitability under Rules.

He shall be entitled to services benefits under Rules;

however, he would be liable for payment of only 1/3rd of

back wages, in view of delay in raising the present industrial

dispute.

17. The reference under adjudication is answered

accordingly.

18. Award as above.

RAKESH KUMAR, Presiding Officer

LUCKNOW.

16th September, 2015.

ubZ fnYyh] 5 vDrwcj] 2015

dk-vk- 1963-—vkS|ksfxd fookn vf/kfu;e] 1947 ¼1947

dk 14½ dh /kkjk 17 ds vuqlj.k esa dsUæh; ljdkj e/; jsyos ds

izca/kra= ds lac) fu;kstdksa vkSj muds deZdkjksa ds chp vuqca/k esa

fufnZ"V vkS|ksfxd fookn esa dsUæh; ljdkj vkS|kSfxd vf/kdj.k]

tcyiqj ds iapkV ¼lanHkZ la[;k 88@05½ dks izdkf'kr djrh gS] tks

dsUæh; ljdkj dks 05@10@2015 dks izkIr gqvk FkkA

[lañ ,y&41012@175@2004&vkbZvkj¼ch&I½]

lqefr ldykuh] vuqHkkx vf/kdkjh

New Delhi, the 5th October, 2015

S.O. 1963.—In pursuance of Section 17 of the Industrial

Disputes Act, 1947 (14 of 1947), the Central Government

hereby publishes the Award (Ref. No. 88/05) of the Cent.

Govt. Indus. Tribunal-cum-Labour Court, Jabalpur as

shown in the Annexure, in the industrial dispute between

the management of Central Railway and their workmen,

received by the Central Government on 05/10/2015.

[No. L-41012/175/2004-IR(B-I)]

SUMATI SAKLANI, Section Officer

ANNEXURE

BEFORE THE CENTRAL GOVERNMENT

INDUSTRIAL TRIBUNAL-CUM-LABOUR COURT,

JABALPUR

No. CGIT/LC/R/88/05

Shri Omprakash

S/o Shri Halke,

Village Sironkalan,

Thana : Jhakhoru,

Distt. Lalitpur (MP)

..... Workman

Versus

Divisional Railway Manager,

Central Railway,

Habibganj,

Bhopal (MP)

.... Management

AWARD

Passed on this 5th day of August, 2015

1. As per letter dated 1.9.05 by the Government of India,

Ministry of Labour, New Delhi, the reference is received.

The reference is made to this Tribunal under Section 10 of

I.D. Act, 1947 as per Notification No. L- 41012/175/2004-

IR(B-I). The dispute under reference relates to:

''Whether the action of the management of Divisional

Railway Manager, W.C. Railway, Bhopal MP instead

of regularizing terminating the services of Shri Om

Prakash Halke Ex. MRCL who was working during

the period from 28.6.80 to 18-7-80 & from 28.9.88 to

3.8.89 is justified and legal? If so, to what relief the

workman is entitled for?''

2. After receiving reference, notices were issued to the

parties. Ist party workman submitted statement of claim at

pages 3/1 to 3/2. Case of workman is that he was engaged

in Railway service first time under PWI(R) Nasik from

26.6.80. He was again working with Non-applicant from

24.9.88 to 18.7.89. He was working continuously and gained

temporary status. Workman was medically examined and

he passed in C-1. After his medical examination, applicant

was due as regular employee. Without issuing any notice,

his services were arbitrarily retrenched instead of

regularization in service. The procedure for retrenchment

was not followed.

3. Workman further submits that due to recruitment of

card holders employees he had submitted his form for

reinstatement. It was rejected on 6.9.04 on the ground of

verification from concerned departement. Workman was

declared disqualified for screening by the Committee. Being

aggrieved by rejection as per order dated 6.10.04, workman

raised dispute under reference.

4. 2nd party filed Written Statement opposing claim of

workman. 2nd party contents that workman is praying

reinstatement with backwages. His claim is not covered

under 3rd schedule of Section 7 of ID Act. The reference is

not tenable. Applicant himself admitted in medical

examination found fit in Category "C". The medical category

for gangman is B-1. The claim from reinstatement of

workman is not sustainable. It is further submitted that

workman himself absented from work. Workman was not

recruited. His case was not represented within time. The

dispute is raised after lapse of 15 years is barred by

limitation. It is denied that workman was represented by

4042

THE GAZETTE OF INDIA : OCTOBER 10, 2015/ASVINA 18, 1937

[PART II—SEC. 3(ii)]

2nd party. On medical examination, workman was found fit

in C-1 Category. He is not fit for gangman. That workman

had failed to submit his application through concerned

department. He was originally engaged as casual labour.

Service card was issued. His application was rejected by

Scrutiny Committee. As dispute is raised after 15 years, the

verification of service particulars is not possible. Workman

was not terminated, he himself left the job. The order of

rejection of application is correctly issued by Scrutiny

Committee. The claim of workman cannot be allowed.

5. Workman filed rejoinder reiterating his contentions in

the Statement of claim.

6. Considering pleadings on record, the points which

arise for any consideration and determination are as under.

My findings are recorded against each of them for the

reasons as below:—

"(i) Whether the action of the

In Affirmative

Management of Divisional

Railway Manager, W.C.

Railway, Bhopal MP

instead of regularizing

terminating the services of

Shri Om Prakash Halke Ex.

MRCL who was working

during the period from 28.6.80

to 18-7-80 & from 28.9.88 to

3.8.89 is legal?

(ii) If not, what relief the

Workman is not

workman is entitled to?"

entitled any

relief.

REASONS

7. The terms of reference pertains to legality of

termination of service of workman, claim of workman about

his reinstatement submitting application is beyond the

terms of reference. Workman did not adduce evidence in

support of his claim. His evidence was closed on 13.12.2013.

8. Management's witness Shri Chandra Prakash Yadav

filed affidavit of his evidence supporting contentions of

2nd Party in Written Statement. Management's witness says

that dispute raised after 15 years is not tenable. The on

medical examination, workman was found fit in C-1 Category

whereas medical category of Gangman is B-1. Workman

did not qualify in B-1 Category is not qualified for

appointment as gangman. That workman left job in the

year 1989. He approached for further recruitment after lapse

of 15 years. Workman was negligent in redressing his

grievances. Workman failed to produce his application

through concerned department where he was originally

engaged as casual labour, service card was issued. Workman

was not terminated by Railway Administration. Workman

himself left the job. He failed to submit verified form for

appointment. In his cross-examination, management's

witness says date of 1st appointment of workman is not

written in his affidavit. Notice was not issued to workman

regarding his absence from duty. Public notice was not

issued. Management's witness claims ignorance whether

any enquiry was conducted against workman in 1989, he

was posted at Ganj Basoda. He was not posted at Vidisha

in 1989. He was working as PWI, South Vidisha in November

2012. Workman was found fit in C-1 Category. Post of

workshop khalasi is covered in C-1 category. Alternate job

is provided to regular employee not found fit. Alternate job

is provided in lower category. The terms of reference does

not pertain to alternate job or reappointment of workman

on rejection of application.

9. Workman has not adduced evidence to substantiate

his claim. The dispute is raised after 15 years is highly

belated. For long lapse of time, the dispute relating to

alleged termination of workman seized to exist.

10. Counsel for management submitted written notes of

argument. The citations are also submitted in Case of

Manager, Reserve Bank of India, Balgalore Versus S. Mani

and Others reported in 2005(5)SCC-100. Their Lordship

dealing with Section 25-F, N of I.D. Act, it was held 240

days continuous service rendered by temporary workman

the effect is status to which workman restored on

reinstatement for non-compliance of Section 25-F. 240 days

continuous service does not by itself give rise to a claim of

permanence. The direction for reinstatement for non-

compliance of Section 25-F would only restore to the

workman the same status which he held when his services

were terminated. It is further held that onus and burden of

proof with respect to 240 days continuous service. Failure

of employer to prove a defence if sufficient or amounted to

an admission, discharging the said burden. Initial burden

of proof is on workman to show that he completed 240

days service.

In present case, workman has not adduced evidence to

discharge the burden. For above reasons, I record my

finding in Point No. 1 in Affirmative.

11. In the result, award is passed as under:—

(1) The action of the management of Divisional

Railway Manager, W.C. Railway, Bhopal MP

instead of regularizing termination the services of

Shri Om Prakash Halke Ex. MRCL who was working

during the period from 28-6-80 to 18-7-80 and from

28-9-88 to 3-8-89 is proper and legal.

(2) Workman is not entitled to any relief.

R.B. PATLE, Presiding Officer

ubZ fnYyh] 5 vDrwcj] 2015

dk-vk- 1964-—vkS|ksfxd fookn vfèfu;e] 1947 ¼1947

dk 14½ dh èkjk 17 ds vuqlj.k esa dsUnzh; ljdkj Hkkjrh; LVsV cSad

ds izcaèra= ds lac) fu;kstdksa vkSj muds deZdkjksa ds chp vuqcaè

¹Hkkx IIó[k.M 3(ii)º

Hkkjr dk jkti=k % vDrwcj 10] 2015@vkf'ou 18] 1937

4043

esa fufnZ"V vkS|ksfxd fookn esa dsUnzh; ljdkj vkS|ksfxd vfèdj.k@Je

U;k;ky;] èuckn ds iapkV ¼lanHkZ lañ 8@2011½ dks izdkf'kr djrh

gS] tks dsUnzh; ljdkj dks 05@10@2015 dks izkIr gqvk FkkA

[lañ ,y&12012@59@2009&vkbZvkj ¼ch&I½]

lqefr ldykuh] vuqHkkx vfèdkjh

New Delhi, the 5th October, 2015

S.O. 1964.—In pursuance of Section 17 of the Industrial

Disputes Act, 1947 (14 of 1947), the Central Government

hereby publishes the award (Ref. No. 8/2011) of the

Cent.Govt.Indus.Tribunal-cum-Labour Court No. 1

Dhanbad as shown in the Annexure, in the industrial

dispute between the management of State Bank of India

and their workmen, received by the Central Government

on 05/10/2015.

[No.L-12012/59/2009-IR(B-I)]

SUMATI SAKLANI, Section Officer

ANNEXURE

BEFORE THE CENTRAL GOVERNMENT

INDUSTRIAL TRIBUNAL NO. 1, DHANBAD

In the matter of reference U/s 10 (1) (d) (2A) of

I.D. Act, 1947

Ref. No. 8 of 2011

Employer in relation to the management of

State Bank of India, Dhanbad

And

Their Workmen.

Present :

Sri Ranjan Kumar Saran, Presiding Officer

Appearances :

For the Employers:- None

For the workman: - Sri Kapildeo Sharma, Concerned

workman

State : Jharkhand

Industry:- Banking

Dated: 28-8-2015

AWARD

By Order No. L-12012/59/2009-1R (B-1), dated

02/02/2011, the Central Government in the Ministry of

Labour has, in exercise of the powers conferred by clause

(d) of sub-section (1) and sub-section (2A) of Section 10 of

the Industrial Disputes Act, 1947, referred the following

disputes for adjudication to this Tribunal:

SCHEDULE

"Whether the action of the management of State Bank

of India, in terminating service of Shri Kapil deo

Sharma, water boy w.e.f. 08/10/2004 is legal and

justified? To what relief the workman is entitled?"

2. This case is received from the Ministry of Labour &

Employment on 08.04.2011. After receipt of reference, both

parties are noticed. The workman files their written statement

on 19.04,2011. But the management neither appear nor files

any written statement in spite of regd. Notice being sent.

Hence Exparte argument heard. The workman himself files

many document, which relates to management of SBI,

marked as Ext. M-1 to M-4.

3. The workman's case is that the workman concerned

was appointed as water boy on a monthly remuneration of

Rs. 900/- w.e.f. 28/02/1991 by the management of State Bank

of India, Dhanbad Branch and he worked continuously till

07/10/2004, and has been receiving his remuneration for

the same at the prevailing rate which has subject to revision

from time to time. He has also stated that he was working

from 28.2.1991 and completed more than 240 days

attendance in one calendar year. Before terminating the

service of workman the management not issued any notice

u/s 25 F of I.D. Act nor paid him any retrenchment

compensation. Hence his termittation be treated illegal and

unjustified.

4. The short point involved in this reference is that,

whether the termination of the workman is just and proper

or not. The workman have been terminated by the

management without assigning any rhyme or reason.

5. The workman who is a bank employee joined as daily

wager w.e.f. 28.2.1991. But after working for a long period,

he claims for regularization as well as increase his

remuneration for which his service was termmanted.

6. The workman said that he is still job less and his case

is not forwarded for consideration and kept under carpet.

The workman files series of document, that he was working

continuously. In spite due notice the Bank management

neither appeared nor have his say. Hence Tribunal

proceeds on the basis of material produced on the record.

7. The workman files appointment letter, and he has also

files letter of State Bank of India. letter No. 21/1585 dated

02.03.1998, Marked as Ext. W-2, in which Asstt. General

management submits that as per letter of Head Office Letter

No. CDO No. PER/940/4097 dated 8th Nov. 1997, he

forwarded the name of Sri Kapildeo Sharma, concerned

workman to the higher authority for his absorption as he

completed 240 days in one calender year. It reveals that the

concerned workman competed 240 days in twelve calender

month against vacancies and he worked during leave/

transfer/ promotion/retirement/death etc of permanent

employee.

8. Considering the facts and circumstances of this case,

and perusing the letter of the management, the termination

4044

THE GAZETTE OF INDIA : OCTOBER 10, 2015/ASVINA 18, 1937

[PART II—SEC. 3(ii)]

of Shree Kapildeo Sharma in our opinion is not legal and

.justified. Hence this Tribunal orders the workman be taken

immediately as daily wager, and be saved from starvation,

and the management is also directed to regularize him in

any lowest grade within 6 months from the date of

publication of the award in Gazette of India in any branch

of SBI, Dhanbad District or Bokaro District.

This is my award.

R.K. SARAN, Presiding Officer

ubZ fnYyh] 5 vDrwcj] 2015

dk-vk- 1965-—vkS|ksfxd fookn vfèfu;e] 1947 ¼1947

dk 14½ dh èkjk 17 ds vuqlj.k esa dsUnzh; ljdkj Hkkjrh; LVsV cSad

ds izcaèra= ds lac) fu;kstdksa vksj muds deZdkjksa ds chp vuqcaè

esa fufnZ"V vkS|ksfxd fookn esa dsUnzh; ljdkj vkS|ksfxd vfèdj.k]

èuckn ds iapkV ¼lanHkZ lañ 266@2001½ dks izdkf'kr djrh gS] tks

dsUnzh; ljdkj dks 05@10@2015 dks izkIr gqvk FkkA

[lañ ,y&12012@252@2001&vkbZvkj ¼ch&I½]

lqefr ldykuh] vuqHkkx vfèdkjh

New Delhi, the 5th October, 2015

S.O. 1965.—In pursuance of Section 17 of the Industrial

Disputes Act, 1947 (14 of 1947), the Central Government

hereby publishes the award (Ref. No. 266/2001) of the

Cent.Govt.Indus.Tribunal-cum-Labour Court No. 1,

Dhanbad as shown in the Annexure, in the industrial

dispute between the management of State Bank of India

and their workmen, received by the Central Government

on 05/10/2015.

[No. L-12012/252/2001-IR(B-I)]

SUMATI SAKLANI, Section Officer

ANNEXURE

BEFORE THE CENTRAL GOVERNMENT

INDUSTRIAL TRIBUNAL NO.1, DHANBAD

In the matter of reference U/s 10(1) (d) (2A) of

I.D. Act, 1947.

Reference No. 266 of 2001

Employer in relation to the management of

State Bank of India, Bhagalpur

And

Their workman

Present :

Sri R.K.Saran, Presiding Officer

Appearances:

For the Employers :- Shree S.N. Goswami, Advocate.

For the Workman :- Shree D.S. Sinha, Advocate

State:- Jharkhand.

Industry :- Banking.

Dated 17-8-2015

AWARD

By Order No.-L-12012/252/2001 IR-(B-1), dated

26/11/2001, the Central Govt. in the Ministry of Labour

has, in exercise of powers conferred by clause (d) of sub-

section (1) and sub-section (2A) of Section 10 of the

Industrial Disputes Act.1947, referred the following

disputes for adjudication to this Tribunal:

SCHEDULE

"Whether the workman Sri Priyadarshi Ashok had

worked with State Bank of India, Sikandra Branch,

Distt- Jamui between 01.07.1985 to 25th August 1999

as Massenger? If so the action of the management in

terminating the service of the applicant w.e.f. 25th

August 1999 is justified? If not what relief the

workman is entitled?"

2. The case is received from the Ministry of Labour on

10.12.2001. After receipt of reference, both parties are

noticed. The workman files their written statement on

12.07.2005. After long delay the management files their

written statement-cum-rejoinder on 02.11.2012. Three

witnesses on behalf of the workman are examined and

documents marked as W-1 to W15.

3. The case of the workman is that the concerned

workman was appointed to the post of messenger in sub-

ordinate cadre in the month of July 1985. The services of

the workman was also utilised for clerical job but he was

being paid daily wages continuously from 1985 to 1999. So

he claimed to be reinstated against permanent vacancy.

4. Case of the management is that Sri Priyadarshi Ashok

was firstly engaged in Bank on 01.08.1985 as daily wager.

To meet the need as because of shortage of Subordinate

staff at the Branch to do the jobs of sundry works as water

Boy-cum- messenger dispatching/ delivery of Banks Dak /

letters and he was paid Rs. 25/- per day thereafter Rs. 35/-

per day through Banks Cheque and sometimes by credit to

his S.B Account as and when required.

5. The workman was engaged by the Branch Manager

of S.B.I. as a messenger. There is enough material to show

the workman worked under the Bank as casual employee

on wage. There is prove that the workman completed 240

days, in a calendar year and prays for regularisation. But

when the workman prays for regularisation , the

management did not to regularise him and terminate the

service of workman. Subsequently the workman is died

soon after losing the service.

6. For the regularisation of the workman the Branch

Manager has written several times to the higher officer and

the same is regretted without any reason.

7. As per Ext. W-2 the workman worked 277 days in

1986, which is the certificate of temporary service on daily

wages issued by the S.B.I. Management .

8. As per Ext. W-12, which is also management

document, in which management is submitted that he is

¹Hkkx IIó[k.M 3(ii)º

Hkkjr dk jkti=k % vDrwcj 10] 2015@vkf'ou 18] 1937

4045

used as permanent employee and he has access to all books.

He has paid wages for every sunday and holiday. Many

document marked which is issued by the management, in

which management has instructed, the he is an assets of

the bank, not to be retrenched.

9. Considering the facts and circumstances it is revealed,

that the management even not complied 25 F which ought

to be complied prior to retrenching the workman. In the

meantime, the workman concerned has died and his wife is

substituted.

10. The wife of the deceased urged for relief. Since the

workman rendered service to the Bank for a long period as

well as more than 240 day in a year. The widow of the

workman be given work as a casual employee, as his

husband was working in the bank, with the prevalent wage

structure soon after the publication of this award in the

Official Gazatte.

This is my award.

R.K. SARAN, Presiding Officer

ubZ fnYyh] 5 vDrwcj] 2015

dk-vk- 1966-—vkS|ksfxd fookn vf/kfu;e] 1947 ¼1947

dk 14½ dh /kkjk 17 ds vuqlj.k esa dsUnzh; ljdkj if'pe e/;

jsyos ds izca/kra= ds lac) fu;kstdksa vkSj muds deZdkjksa ds chp

vuqca/k esa fufnZ"V vkS|ksfxd fookn esa dsUnzh; ljdkj vkS|ksfxd

vfèdj.k ,oa tcyiqj ds iapkV ¼lanHkZ lañ 47@2007½ dks izdkf'kr

djrh gS tks dsUnzh; ljdkj dks 05-10-2015 dks izkIr gqvk FkkA

[lañ ,y&41012@65@2010&vkbZvkj¼ch&I½]

lqefr ldykuh] vuqHkkx vf/kdkjh

New Delhi, the 5th October, 2015

S.O. 1966.—In pursuance of Section 17 of the Industrial

Disputes Act, 1947 (14 of 1947), the Central Government

hereby publishes the Award (Ref. No. 47/2010) of the

Central Government Industrial Tribunal-cum-Labour Court,

Jabalpur as shown in the Annexure in the Industrial Dispute

between the management of Paschim Madhya Railway and

their workmen, which was received by the Central

Government on 05.10.2015.

[No. L-41012/65/2010-IR(B-I)]

SUMATI SAKLANI, Section Officer

ANNEXURE

BEFORE THE CENTRAL GOVERNMENT

INDUSTRIAL TRIBUNAL-CUM-LABOUR COURT,

JABALPUR

NO. CGIT/LC/R/47/2010

Shri Sourabha Mehroliya,

S/o Shri Govind Mehroliya

R/o Rly. Bunglow No. 158-A,

Servant Quarter, South Civil Lines,

Jabalpur.

...Workman

Versus

General Manager,

Paschim Madhya Railway,

Jabalpur.

...Management

AWARD

Passed on this 2nd day of September 2015

1. As per letter dated 23-9-2010 by the Government of

India, Ministry of Labour, New Delhi, the reference is

received. The reference is made to this Tribunal under

Section-10 of I.D. Act, 1947 as per Notification No. L-41012/

65/2010-IR (B-I). The dispute under reference relates to:

"Whether the action of the General Manager, Paschim

Madhya Railway, Jabalpur(MP) in terminating the

services of Shri Sourabh Mehroliya S/o Shri Govind

Meroliya w.e.f. 24-9-09 is legal and justified? If not,

what relief he is entitled to?"

2. After receiving reference, notices were issued to the

parties. Workman submitted statement of claim. Case of Ist

party workman is that he was appointed as substitute

Bunglow peon in pay-scale 2550-3200 with approval of

General Manager of WCL on 24-10-07. His date of birth is

5-8-89, educational qualification is 8th standard pass in

General Category. That his appointment is purely temporary

Workman was eligible for regular absorption in Group D

after completion of 3 years service. The appointment was

provisional subject to verification of character and

antecedent. As per Railway Board's letter dated 31-12-03,

his services were covered under contributory pension

Scheme. Workman had passed medical examination under

Category A-II by Medical Certificate dated 15-10-07.

Workman joined service on 25-10-07 and drawing salary in

said scale. That he was regular in service. He was served

with warning that he was not regular in his work and not

performing house hold work, remaining absent form duty

as per letter dated 6-8-09. Another warning was received

vide letter dated 17-8-09. Workman submitting his

explanation claimed that he was regular in performing his

duty. That workman was not allowed on duty from 18-8-09.

He had requested General Manager but nothing was done.

Any action was not taken on his request. As per order

dated 24-09-09 by Vagilance Department, his services were

terminated on the ground that despite warning letters, he

did not improve his habits. That substitute Bunglow Peon

requires 3 years regular service for eligibility to be absorbed

as peon in regular service Grade D. That 15 days notice has

been served on him and 15 days salary before terminating

his services by Dy. Chief Engineer Officer III.

3. After receiving termination order, workman submitted

representation which was not considered. Workman had

put 1 year 11 months 1 day regular service. The warning

letters issued to him is pre-determined planning to terminate

his service before completing 3 years service for eligibility

for absorption. Such practice is illegal.

4046

THE GAZETTE OF INDIA : OCTOBER 10, 2015/ASVINA 18, 1937

[PART II—SEC. 3(ii)]

4. That workman was issued privilege pass of 2nd class

dated 21-08-09 from Mumbai to Howrah valid till 21-12-09.

The substitute peon are engaged in regular pay-scale in

short-term vacancy. A panel of suitable persons used to be

drawn available with subordinates for engaging them. That

after completion of 120 days continuous service, he is

entitled to temporary status. Benefit of medical treatment

or self was eligible for the workman. The substitute pen is

also entitled to benefit of usual increments, on completion

of 1 year service. Ist party workman prays that as per terms

and conditions specified in appointment letter. Workman

could have been issued chargesheet as per Discipline

Appeal Rules 1960. No chargesheet was issued to workman.

As per Article 311, no civil servant shall be removed or

dismissed from service or reduce in rank without any

inquiry. Workman submits that principles of natural justice

were not followed. He was not given reasonable

opportunity issuing chargesheet. Termination of his service

is in violation of provisions of ID Act. On such ground,

workman prays for withdrawal of termination order dated

24-09-09 and his reinstatement.

5. 2nd party filed written Statement opposing claim of

the workman. The appointment of workman as Bunglow

Peon is not denied. Workman remained absent for

considerable period without satisfactory reasons. Workman

was not appointed as regular peon. He willfully disobeyed

service conditions. The warnings were issued to him.

Workman failed to comply with his duty. His services were

terminated by Competent Authority following due process.

The representations of workman were not received.

Workman was not sincere. His performance in service as

bunglow peon was not satisfactory. Workman himself failed

to provide substitution allowance as per policy for

recruitment in department.

6. Workman filed rejoinder reiterating his contentions in

statement of claim alleging that Written Statement filed by

management is devoid. That order was issued for

termination of his service and not paid to retrenchment.

Section 25-F(a,b) were not followed. One months notice or

salary for one month was not paid to workman.

Retrenchment Compensation was also not paid to him. Any

enquiry was not conducted against him. Documents of

enquiry were not provided to the workman.

7. Considering pleadings on record, the points which

arise for my consideration and determination are as under.

My findings are recorded against each of them for the

reasons as below:—

(i)

Whether the action of the

General Manager, Paschim

In Negative

Madhya Railway, Jabalpur(MP)

in terminaing the services of Shri

Sourabh Mehroliya S/o Shri

Govind Mehroliya w.e.f. 24-9-09

is legal and justified?

(ii)

If not, what relief the

As per final

workman is entitled to?"

order.

REASONS

8. There is no dispute between parties that workman

was appointed as substitute peon. Warnings were issued

to Workman. workman filed affidavit of his evidence. He

was stated that he was appointed on 24-10-07 with approval

of Competent authority as Bunglow peon. He worked with

honesty. He was appointed in pay Scale Rs. 2250-3200.

That his services were terminated on imaginary ground by

Dy. Chief Engineer Officer III is illegal. That after completion

of 120 days, he is eligible for temporary status. Without

giving any opportunity of hearing, his services were

terminated illegally. From evidence of workman, documents

Exhibit W-1 to W-10 are exhibited. Workman in his cross-

examination says he passed 8th standard. The post was

not advertised. He was working with Shri Virendra Kumar

since 2 years prior to his appointment as substitute peon.

He had not submitted application for his appointment. Shri

Virendra Kumar had made efforts for his appointment.

Appointment letter was received by him. He was working

at Bunglow peon, doing all kind of work including labour.

That warning letter Exhibit W-4 was issued to him for

absence from duty is wrong. Exhibit W-7 dose not bear the

date. Said letter also doesnot bear acknowledgement of

the person receiving it. Exhibit W-10 does not bear his

signature. He denies that he has not completed 3 years

service.

9. Management filed affidavit of witness Shri R.K. Swami.

The witness of management says services of workman were

terminated. Workman was irregular in his duty. His work

was unsatisfactory. Dy Chief Vigilance Officer terminated

workman following procedure. In his cross-examination,

witness of management admits that on Exhibit W-1, on

behalf of Chief Personnel Officer, it is signed by Asstt.

Personnel Officer. He denies suggestion that Appointing

Authority of workman is General Manager. He claims that

he was competent to terminate services of workman.

10. Management's witness Shri Virendra Kumar in his

affidavit of evidence says that in 2007, workman was

engaged as substitute Bunglow Peon. Workman was

irregular in duty. His work was unsatisfactory. Workman

was orally warned but he failed to fulfil requirement of

service. That workman is not entitled to protection of

Section 25-F of ID Act. From his evidence, Exhibit W-2 is

proved. Management's witness in his cross-examination

says no record is maintained about warning issued to

workman. He was unable to tell its date. Along with

retrenchment notice, amount of 15 days salary was sent to

workman. The warning letter dated 6-8-09 was given by

him. The record about irregular attendance of workman

was maintained in Engineering Deptt. Exhibit M-3, 2nd part

of record of attendance is not available. Workman was

retrenched, he was not promoted.

11. Learned counsel for workman Mr. Pandiya during

course of argument pointed out my attention that

appointment letter Exhibit W-1 is issued by Chief Personnel

Officer. Termination order Exhibit W-6 is signed by Dy.

¹Hkkx IIó[k.M 3(ii)º

Hkkjr dk jkti=k % vDrwcj 10] 2015@vkf'ou 18] 1937

4047

Chief Vigilance Officer, Authority lower than rank to the

Appointing Authority. Document Exhibit W-6 is not issued

by Appointing Authority, Chief personnel Officer rather it

is issued by Dy. Chief Vigilance Officer III. No documents

are produced that Dy. Chief Vigilance Officer was of equal

rank to the Appointing Officer, Chief Personnel Officer and

he was as such competent to terminate services of workman.

In Exhibit W-6 termination order, workman was informed

that for retrenchment, 15 days salary would be paid. Amount

was not actually paid to workman. The cheque was not

accompanied with the order. The amount is not specified.

As such termination of workman by Authorioty other than

Appointing Authority cannot be said legal. Workman was

not paid retrenchment compensation mentioned in Exhibit

W-6. These rules about substituted employees are

produced. The rules provides that after completion of 120

days continuous service, casual labour is entitled to

temporary status, he is entitled for benefit of medical

treatment, educational benefits after completing 4 months

continuous service. On completion of one year service

from date of acquiring temporary status entitled to annual

increments. Workman had completed 120 days service, he

was eligible for temporary status after acquiring temporary

status, the services of workman could not be terminated

without enquiry. Warning letters issued to workman is

produced at Exhibit W-4. Services of workman are terminated

for unasatisfactory work which could be said misconduct

but no enquiry was conducted. As per Exhibit M-1,

appointment of service condition of bunglow peon are

produced. Officers entitled to bunglow peon are allowed

to pick up candidates in whom they have trust. Candidate

should be 18-25 years of age, should be literate, should be

declared medically fit. Substitutes should be appointed on

monthly rate of pay Rs. 7-80. Clause VII of Exhibit M-1

clearly provides that bunglow peon who has not completed

3 years service can be terminated without assigning reason

either on transfer of the Officer to who he is attached after

giving him notice, compensation admissible under rules.

Workman was not paid retrenchment compensation though

he had completed 1 year 11 months services. Only 15 days

wages were paid. It was also not paid alongwith termination

order. Documents produced by management about

attendance of workman shows he was absent for 27 days

in 2003, 60 days in 2007 to 2010, 13 days in 2003. The period

of absence of workman after his appointment was only 4

days. As per documents produced by management,

workman was paid salary in pay scale 2500-20200(M-2).

From reasons discussed above, it is clear that workman

was terminated in violation of Section 25-F. He was not

paid retrenchment compensation, 15 days salary was also

not sent to workman along with termination order. The

termination of workman is illegal. For above reasons, I record

my finding in Point No. 1 in Negative.

12. Point No. 2. In view of my finding in Point No. 1

workman is termination illegally by authority other than

appointing authority in violation of Section 25-F, of ID Act,

question is whether workman is entitled for reinstatement.

Workman had completed 1 year 11 months service, he was

appointed as substitute peon on completion of 3 years

continuous service. Workman would be eligible for

absorption as bunglow peon. Whether in context of above

facts, reinstatement with backwages could be allowed, it

needs to be considered. The written notes of arguments

submitted by counsel for both parties do not cover above

aspect. Learned counsel for workman produced copy of

Award in R/178/97 passed by my predecessor. Said reference

also pertains to termination of service of substituted

Khalasi. Reinstatement of workman with backwages was

allowed. As the rules provides eligibility for workman for

absorption as regular peon on completion of 3 years service.

The evidence of workman that he was working with Shri

Virendra Kumar 2 years prior to his appointment as

substitute peon, workman has worked for vital years of his

young age if reinstatement is not allowed, he will loose

opportunity for absorption as regular peon Reinstatement

of workman with backwages would be appropriate.

Accordingly I record my finding in Point No. 2.

13. In the result, award is passed as under:—

(1) The action of the General Manager, Paschim

Madhya Railway, Jabalpur (MP) in terminating

the services of Shri Sourabh Mehroliya S/o Shri

Govind Mehroliya w.e.f. 24-9-09 is not proper and

legal.

(2) 2nd party is directed to reinstate workman with

backwages. Parties to bear their respective costs.

R.B. PATLE, Presiding Officer

ubZ fnYyh] 5 vDrwcj] 2015

dk-vk- 1967-—vkS|ksfxd fookn vf/kfu;e 1947 ¼1947 dk

14½ dh /kkjk 17 ds vuqlj.k esa dsUnzh; ljdkj lriqjk ueZnk xzkeh.k

{ks=h; cSad ds izca/kra= ds lac) fu;kstdksa vkSj muds deZdkjksa ds

chp vuqca/k esa fufnZ"V vkS|ksfxd fookn esa dsUnzh; ljdkj vkS|ksfxd

vf/kdj.k tcyiqj ds iapkV ¼lanHkZ la[;k 111@2007½ dks izdkf'kr

djrh gS] tks dsUnzh; ljdkj dks 05@10@2015 dks izkIr gqvk FkkA

[lañ ,y&12012@40@2007&vkbZvkj ¼ch&I½]

lqefr ldykuh] vuqHkkx vf/kdkjh

New Delhi, the 5th October, 2015

S.O. 1967.—In pursuance of Section 17 of the Industrial

Disputes Act, 1947 (14 of 1947), the Central Government

hereby publishes the Award (Ref. No. 111/2007) of the Cent.

Govt. Indus. Tribunal-cum-Labour Court, Jabalpur as

shown in the Annexure in the Industrial Dispute between

the management of Satpura Narmada Gramin Kshetriya Bank

and their workmen, received by the Central Government on

05/10/2015.

[No. L-12012/40/2007-IR(B-I)]

SUMATI SAKLANI, Section Officer

4048

THE GAZETTE OF INDIA : OCTOBER 10, 2015/ASVINA 18, 1937

[PART II—SEC. 3(ii)]

ANNEXURE

BEFORE THE CENTRAL GOVERNMENT

INDUSTRIAL TRIBUNAL-CUM-LABOUR COURT,

JABALPUR

NO. CGIT/LC/R/111/2007

Shri Nand Kishore Belkhede,

R/o Vill & PO Goreghat,

Tehsil Katangi,

Distt. Balaghat (MP),

Balaghat

...Workman

Versus

The Chairman,

Satpura Narmada Gramin Kshetriya Bank,

Distt. Chhindwara

...Management

AWARD

Passed on this 31st day of August 2015

1. As per letter dated 25.9.07 by the Government of India,

Ministry of Labour, New Delhi, the reference is received.

The reference is made to this Tribunal under Section-10 of

I.D. Act, 1947 as per Notification No. L-12012/40/2007-IR

(B-I). The dispute under reference relates to:

"Whether the action of Chairman, Satpura Kshetriya

Gramin Bank, Chhindwara in terminating the services

of Shri Nand Kishore Belkhede without departmentral

proceeding, is legal and justified? If not, to what

relief the workman concerned is entitled to?"

2. After receiving reference, notices were issued to the

parties. Ist party workman submitted statement of claim at

Page 3. Case of Ist party workman is that he was engaged

as peon cum messenger by Branch Manager Goreghat

branch on 14-5-90. Thereafter he was posted in Katangi

branch. He rendered his services in said branch till

27-11-03. That he was engaged on vacant sanctioned post

after following due process by 2nd party No. 2. He rendered

his services diligently for more than a decade. That he was

eligible for regularization of post of messenger cum peon

considering his long continuous service.Workman had

submitted representations to the Bank for regularization

but were of no avail. Workman had filed Writ petition 1095/

02 before Hon'ble High Court, MP Jabalpur. The Writ

Petition was disposed off on 20-3-02 allowing apportunity

to raise his grievance before appropriate forum. Workman

raised dispute through Union before conciliation authority

under ID Act. During pendency of conciliation proceeding

before ALC, Chhindwara, his services were dispensed with

from 27-11-03 by the Bank without issuing order in writing.

He was not served with notice or compensation in lieu of

notice was not paid to him.

3. Ist party workman reiterates that he completed more

than 240 days continuous service. He is covered as

employee under Section 25 B of ID Act. The respondent

Bank failed to follow guidelines and scheme for

regularization of daily wage employees completing 240 days

service in a calendar year i.e. circular issued by NABARD

dated 7-5-87 and circular by RBI dated 8-10-84. The case of

Ist party workman as well as co-employee was put up by

Union before Bank for implementation of above circular for

regularization. Despite of agreement was raised upon

between Union and Bank for unknown reasons. 2nd party

Bank denied to implement the same. Letter dated 20-3-94 is

relied. It is alleged that Bank despite need of regular staff

on post of messenger cum peon adopted unfair labour

practice dehors the principles of natural justice. In violation

of Section 33(C) of ID Act, services of workman were

terminated without notice. 2nd party continued practice of

pick and choose the daily rated employees at their whims

and fancies. 2nd party Bank violated section 25-F, G, H of

ID Act as juniors to the workmen were retained in service

even after discontinuation of service of Ist party workman.

It is alleged that after discontinuing workman, other fresh

persons were appointed in place of daily wagers. Policy of

last come first go was not followed. Workman should have

been given preference over others in case of new

recruitment. The sponsored Bank of 2nd party Central Bank

of India issued directions to all branches on 16-2-90

directing them to provide information of all daily wage

employees who have completed 240 days continuous

service in 12 months during the period 1-1-82 to 31-3-95 by

Regional Office, Chhindwara. The direction was not

complied. It is reiterated that during pendency of

conciliation proceedings pertaining to regularization of

services, workman was discontinued by the Bank in arbitary

manner. The broad of directors taken decision to discharge

services of employees during pendency of conciliation

proceedings vide communication dated 20-11-03. Workman

further submits that since his initial employment from

14-5-90 till 27-11-03, PF amount was deducted from hi wages.

The deduction of PF wages of workman clearly indicates

that he worked more than 240 days in a calendar year. His

services are terminated illegally. On such ground, workman

prays for his reinstatement with full backwages.

4. 2nd party filed Written Statement opposing claim of

workman. 2nd raised preliminary objection that workman

has committed theft of documents. All the documents relied

by workman are denied. That 1st party is not workman he

was never appointed by the management he was not

sponsored through Employment Exchange. He did not

undergo process of selection. The board has not

sanctioned any such post. 2nd party has no policy to

appoint any person contrary to the norms and rules their

relationship of master servant between parties is denied. It

is denied that workman was engaged by Branch Manager,

Goreghat branch, Distt. Balaghat as peon cum messenger.

It is denied that workman was transferred to Katangi branch

and has rendered continuous service from 14-5-90 to

¹Hkkx IIó[k.M 3(ii)º

Hkkjr dk jkti=k % vDrwcj 10] 2015@vkf'ou 18] 1937

4049

27-11-03. It is denied that workman was engaged on vacant

sanctioned post following due process. It is reiterated that

workman has not completed 240 days continuous service

during any of the calendar year. He is not covered as

employee under Section 25 B of ID Act. 2nd party denies

that despite need of regular staff, the post of messenger

cum peon, the Bank adopted unfair labour practice. It is

denied that services of workman are dispensed with in

violation of provisions of ID Act. It is submitted that

provisions of ID Act are not applicable to present case.

Termination of services of workman in violation of Section

25-F, G, H, of ID Act is denied. That temporary need in the

Bank depends on casual work which is fulfilled by any

person who offers his service for required period. The

principles of policy of last come first go is not attracted in

the matter.

5. 2nd party denied that any circulars for regularization

to temporary employee has been issued. Appointment of

workman is denied. That deduction of PF is in compliance

of provisions under PF Act. The prayer of workman is

opposed. It is submitted that workman is not entitled to

any relief.

6. Ist party workman filed rejoinder reiterating his

contentions in statement of claim.

7. Considering pleadings on record, the points which

arise for my consideration and determination are as under.

My findings are recorded against each of them for the

reasons as below:-

(i) Whether the action of Chairman,

Satpura Kshetriya

In Negative

Gramin Bank, Chhindwara in

terminating the services of

Shri Nand Kishore Belkhede

without departmental proceedings

is justified?

(ii) If not, what relief the

As per final

workman is entitled to?"

order.

REASONS

8. Workman is challenging discontinuation of his service

in violation of Section 25-F of ID Act. In support of his

claim, workman filed affidavit of his evidence. Workman

says that he was engaged as sweeper cum messenger from

2-4-90 in branch mate, Tehsil Kirnapur by Branch Manager

on vacant post. He worked in Goreghat branch from

14-5-90 to 15-11-94. He worked more than 240 days in each

calender year from 16-11-94 to 26-11-03, he continuously

worked more than 240 days during each of the year. His

services were terminated without notice, he was not paid

retrenchment compensation. He raised dispute for

regularization of his service. During pendency of

conciliation proceedings, his services were discontinued.

After termination of his services, other daily wage

employees were engaged by the Bank he was not given re-

employment. He was paid wages at Collector rate Rs. 82.77

per day. 12% amount of wages was deducted towards PF

during the year 1999 to 2003. In his cross-examination,

workman says appointment letter was not given to him, the

post was not advertised. He has not produced certificate

of working, payment vouchers, pass book. He denied that

he had not worked for more than 240 days during any of

the year. The certificate of working days is not produced.

Other employee was not engaged after his disengagement.

He produced documents about deduction of PF. He was

paid wages for his working days. The documents Exhibit

W-3 (a) to (c) are admitted from his evidence in cross-

examination. He has no other documents.

9. Managements's witness Snehlata Jaiswal filed affidavit

of her evidence denying workman was appointed on vacant

post as messenger on 14-5-90 in Gorighat branch. That

workman had not worked in said branch during May 90 to

October 94. Workman never worked for 240 days during

any of the year. Ist party workman is not employee of the

Bank. There was no question of issuing notice or payment

of compensation to him, she has further stated that

whenever any casual work occurs any person including

applicant is available comes, Bank offers to do casual work.

On completion of such casual work, his services

automatically comes to end. In her cross-examination,

management's witness says she did not work in either of

the branches at any time. She was working in control office

during 1983 to 94. The witness of the management was

unable to tell whether PF was deducted, she was unable to

tell whether workman had account no. 884 in the branch

and his wages were deposited in said account. She claims

ignorance whether Head Office call details about casual

labours working in the branch. Casual labour was engaged

as per need. Entries of payment under voucher was

recorded in cash scroll. She has not seen cash scroll.

Suggestion is denied that workman had worked more than

240 days. Evidence of management's witness is hearsay

and evidence of workman is supported by document

Exhibit 3(a) to (g). That he filed affidavit in this case as per

information forwarded by Branch Manager. The Branch

Managers are in service. Workman was not employee of

the Bank. He was not paid retrenchment compensation. No

chargesheet was issued to him for any misconduct. She

claims ignorance whether some employees are reinstated

in service as per order passed by Hon'ble High Court. From

cross-examination of management's witness, it is clear that

she was not working in the branch. She gave evidence as

per information received by Branch Manager. She has no

personal knowledge.

10. Workman has produced documents. Exhibit W-1

settlement between Union and management of the Bank

dated 20-3-94. Exhibit W-2 refers to Board of Directors

decision to terminate immediately daily wage employees.

Documents Exhibit W-3(a) to (g) shows payment of wages

4050

THE GAZETTE OF INDIA : OCTOBER 10, 2015/ASVINA 18, 1937

[PART II—SEC. 3(ii)]

to workman during 1990 to 1993. Other documents produced

by workman are not proved by valid evidence.

11. The question arise about evidence of workman and

management's witness. As discussed above, the

management's witness has no personal knowledge. Her

evidence is based on information received from Branch

Manager who are still working in the branch. The

documents maintained in the Bank payment register, AC

statement, etc. which are maintained by the Bank are not

produced. On the other hand, evidence of workman is

corroborated from documents Exhibit W-3 (a) to (g).

12. The evidence of workman in cross-examination

shows that workman has not produced documents about

his working for 240 days. After discontinuation of his

service, other persons engaged on daily wages. The

documents relating to it are not produced. The deduction

of PF of workman is shown as Exhibit W-3 (a) to (g) is

indicative that the workman was working with 2nd party

was covered under provisions of PF Act. The management's

witness in her cross-examination says she doesnot mean

that workman was never working in the Bank. In cross-

examination of workman, there is no suggestion that

workman was not working with Bank or he had not

completed 240 days continuous service as stated in his

affidavit. Evidence of workman on above point remained

unchallenged in his cross-examination. Evidence of

workman is supported by some documents Exhibit W-3 (a)

to (g) and his evidence remained unchallenged on the point

he had worked than 240 days during any of the year. The

evidence of management's witness is silent as to who was

working as regular sweeper in the Bank. I find no reason to

disbelieve workman that he was continously working in

the Bank from 1990 to 2003. Evidence of workman is about

completing more than 240 days continuous service finds

corroboration from document Exhibit W-2. As per settlement

Exhibit W-1, the process for regularization of part time

employee, part time farrash was started and it was not to be

completed till 5-4-94 as per the circulars issued by NABARD

dated 7-5-87, circular issued by RBI 8-10-84. 2nd party has

not produced those circulars. The evidence of

management's witness is clear that workman was not served

with notice. Retrenchment compensation was not paid to

him, services of workman are terminated without violation

of Section 25-F of ID Act.

13. Learned counsel for Ist party Shri A.K. Shashi relies

on ratio held in case of

Maharashtra State Board of Secondary and Higher

Secondary Education, Amravati and another versus Sanjay

Krishnarao Shrungare Amravati reported in 2008-II-CLR-

301. Their Lordship dealing with Section 25-F, G, H of ID

Act in case related to unfair labour practice under

Maharashtra Act held that best possible evidence on the

point of total service put I by the respondents not brought

on record by the appellant. Appellant has to blame itself

for this failure on its part. The Labour Judge and the

Industrial Court did not err in drawing their conclusions.

In present case, though management's witness admits

the record of various files is maintained in the Bank. It is

not produced. It appear that management is suppressing

the material evidence. From above reasons, it is clear that

services of Ist party workman are terminated in violation of

Section 25-F of ID Act. Therefore I record my finding in

Point No. 1 in Negative.

14. Point No. 2-In view of my finding in Point No. 1

termination of Ist party is in violation of Section 25-F of ID

Act, question remains for consideration whether workman

is entitled for reinstatement with backwages. Though

workman in his pleadings and evidence has referred to the

circulars issued by NABARD and RBI relating to regulation

of part time employees, those circulars are not produced

on record, the term of reference pertain to regularization of

workman rather it pertains to legality of termination of his

service. From reasons dealing with Point No. 1, it is clear

that Ist party workman was working continuously with

2nd party as peon/sweeper from 1990 to 2003 for about 12-

13 years but post was not advertised. Workman was not

issued appointment letter. Workman was engaged on daily

wages.

As per Exhibit W-2, 54 part time employees were working

against sanctioned post for long period. The advice of

General Manager was requested by the Chairman. Point

w.r.t. the relief for reinstatement with backwages, Shri A.K.

Shashi counsel for workman pointed out my attention to

the award passed in R/88/2001 & R/9/2to 17/12 & 1/13.

Considering ratio held in various cases, in Para 28 of the

award, it was observed that workman have worked for

different period. The reinstatement with backwages is not

automatic. The facts of each case needs to be considered.

Workman who worked more than 2 years and workman

working between 4-7 years needs different consideration.

Workman who have completed 10 years service for long

time deserves reinstatement. Workman working more than

7 years deserve compensation Rs. 50,000/- workman

working about 4 years deserves compensation Rs. One

Lakh. Same principle would be applied while dealing with

the claim for reinstatement by workman. Workman was

working with the 2nd party from 1990 to 2003 for about 13

years justified his claim for reinstatement.

15. Learned counsel for 2nd party Shri Pramesh Jain

submitted written notes of argument opposing claim of

workman for reinstatement that workman had not completed

240 days continuous service. Learned counsel relies on

ratio held in

Case of BSNL versus Bhurumal reported in Civil Appeal

No. 10957/2013. In Para 24 of the judgment, their Lordship

considering ratio held in case of State of Karnataka versus

Uma Devi 2006(4) SCC-1 observed thus when he cannot

¹Hkkx IIó[k.M 3(ii)º

Hkkjr dk jkti=k % vDrwcj 10] 2015@vkf'ou 18] 1937

4051

claim regularization and he has no right to continue even

as a daily wage worker, no useful purpose is going to be

served in reinstating such a workman and he can be given

monetary compensation by the Court itself in as much as if

he is terminated again after reinstatement, he would receive

monetary compensation only in the form of retrenchment

compensation and notice pay.

In Exhibit W-1, Union and management had arrived at

settlement of regularization of part time employees on

15-6-94. In Exhibit W-2 Chairman of the Bank has requested

advice of General Manager that 54 part time employees

were working in the Bank since long against sanctioned

post. The ratio in above cited case cannot be applied to

case at hand as the facts are not comparable.

Learned counsel for 2nd party Shri Pramesh Jain also

relies on ratio held in case of Tapash Kumar versus BSNL

repoted in 204A?IR SCW 5816. Their Lordship have

considered when reinstatement can be ordered. The order

of Division Bench awarding compensation in lieu of

reinstatement was set aside. In para-5 of the judgment,

their Lordship held it is no doubt true that Court may pass

an order substituting reinstatement by awarding

compensation but the same has to be based on justifiable

ground i.e. (i) where the industry is closed, (ii) where the

employee has superannuated or going to retire shortly and

no period of service is left to his credit, (iii) where the

workman has been rendered incapacitated to discharge

the duties and cannot be reinstated and (iv) when he has

lost confidence of the management to discharge duties.

In present case, management's witness says any charge

sheet for misconduct was not issued to the workman. The

Bank is not closed. Workman have not attained age of

superannuation. The ratio held in above cited case does

not support the contentions of 2nd party.

Learned counsel for 2nd party also relies on ratio held

in case of Mahboob Deepak versus Nagar Panchayat

Gajraula decided in Appeal NHo. 5875 of 2007. In para 2 of

the judgment, their Lordship discussed it is now well settled

by a catena of decisions of this court that in a situation of

this nature instead and in place of directing reinstatement

with full back wages, the workmen should be granted

adequate monetary compensation.

Ratio held in above case holds the filed the reinstatement

can be refused only on 4 grounds discussed above.

Therefore ratio in above cited case cannot be beneficially

applied. For same reasons, ratio held in case of MP

Administration v/s Tribhuban reported in 2007 (5) Scale

397 cannot be beneficially applied to case at hand.

16. At the time of argument, learned counsel for workman

Shri A.K.Shashi submits that workman is not interested in

backwages rather workman be provided reinstatement

without backwages. For the reasons discussed above, it

would be appropriate to direct reinstatement of workman

considering he was working with 2nd party for about 3

years on daily wages. Despite settlement Exhibit W-1 & W-

2 clearly stating that 54 part time employees were working

against sanctioned post for long period, it is not known

what advice was given by General Manager to said

workman, reinstatement of workman would be appropriate.

Accordingly I record my finding in Point No. 2.

17. In the result, award is passed as under:—

(1) The action of Chairman, Satpura Kshetriya Gramin

Bank, Chhindwara in terminating the services of

Shri Nand Kishore Belkhede is not proper and

legal.

(2) Termination of workman is set-aside. 2nd party is

directed to reinstatement workman without

backwages.

(3) Parties to bear their respective costs.

R.B. PATLE, Presiding Officer

ubZ fnYyh] 5 vDrwcj] 2015

dk-vk- 1968-—vkS|ksfxd fookn vf/kfu;e 1947 ¼1947 dk

14½ dh /kkjk 17 ds vuqlj.k esa dsUnzh; ljdkj mÙkj jsyos

ds izca/kra= ds lac) fu;kstdkas vkSj muds deZdkjksa ds chp

vuqca/k esa fufnZ"V vkS|ksfxd fookn esa dsUnzh; ljdkj vkS|ksfxd

vf/kdj.k y[kuÅ ds iapkV ¼lanHkZ la[;k 26@2010½ dks izdkf'kr

djrh gS] tks dsUnzh; ljdkj dks 05@10@2015 dks izkIr gqvk FkkA

[lañ ,y&41011@109@2009&vkbZvkj ¼ch&I½]

lqefr ldykuh] vuqHkkx vf/kdkjh

New Delhi, the 5th October, 2015

S.O. 1968.—In pursuance of Section 17 of the Indistrial

Disputes Act, 1947 (14 of 1947), the Central Government

hereby publishes the Award (Ref. No. 26/2010) of the

Central Government Industrial Tribunal-cum-Labour Court,

Lucknow as shown in the Annexure, in the Industrial

Dispute between the management of Nothern Railway and

their workmen, received by the Central Government on

05/10/2015.

[No. L-41011/109/2009-IR (B-I)]

SUMATI SAKLANI, Section Officer

ANNEXURE

CENTRAL GOVERNMENT INDUSTRIAL TRIBUNAL-

CUM LABOUR COURT, LUCKNOW

PRESENT

SHRI RAKESH KUMAR,

PRESIDING OFFICER

I.D. No. 26/2010

Ref. No. L-41011/109/2009-IR (B-I) dated: 09.11.2010

4052

THE GAZETTE OF INDIA : OCTOBER 10, 2015/ASVINA 18, 1937

[PART II—SEC. 3(ii)]

BETWEEN

Mandal Sangatan Mantri

Uttar Railways Karmchari Union

283/63, Kh Gadi Kannora

PO Manak Nagar

Lucknow

(Espousing cause of Shri Jag Prasad)

AND

1. Dy. Chief Engineer (Construction)

Uttar Railway Charbagh

Lucknow

2. Deputy Chief Manager (Stores)

Northern Railway, Stores Depot

Alambagh, Lucknow

AWARD

1. By order No. L-41011/109/2009-IR (B-1) dated:

09.11.2010 the Central Government in the Ministry of

Labour, New Delhi in exercise of powers conferred by clause

(d) of sub-section (1) and sub-section (2A) of Section 10 of

the Industrial Disputes Act, 1947 (14 of 1947) referred this

industrial dispute between Mandal Sangatan Mantri, Uttar

Railways Employee Union, 283/63, Kh Gadi Kannora, PO.

Manak Nagar, Lucknow and the Dy. Chief Engineer

(Construction), Uttar Railway, Charbagh, Lucknow &

Deputy Chief Manager (Stores), Northern Railway, Stores

Depot, Alambagh, Lucknow to this CGIT-cum-Labour

Court, Lucknow for adjudication.

2. The reference under adjudication is:

"Whether the action of management of North Central

Railway, Allahabad/Kanpur in not giving Shri Jag

Prasad, T.No. 564 status of temporary worker from

the date of completion of 120 days of service is legal

and justified? If not, what relief the workman is

entitled to?"

3. The case of the workman's union, in brief, is that the

workman, Jag Prasad, has been engaged as casual labour

with in construction unit under opposite party No. 1 and is

presently working under opposite party No. 2. It has been

alleged by the workman's union that the workman under

dispute was to be given temporary status after completion

of 120 days of working as per P.S.N. 7850, Master Circular

48/92 and Rule 2304, 2501 and 2511 of Indian Railway

Establishment Manual; but they were granted temporary

status after five years' of their engagement, which is not

only unfair labour practice but also is against Article 21 of

the Constitution. According, the workman's union has

prayed that the workmen concerned be granted temporary

status from the date they have completed 120 days' working

with consequential benefits.

4. The management of the North Central Railways has

filed its written statement denying the allegations of the

workman's union with submission that the workman under

dispute was initially engaged by them as Project Casual

Labour in Construction Unit with intermittent gap w.e.f.

24.04.79 and has been granted temporary status on 01.01.85

vide letter No. 220-E/3/Recruit dated 22/25.02.85. It has been

submitted that the Railway formulated a scheme to provide

the temporary status to Project Casual Labour, circulated

vide No. E(NG) II/84/CL/41 dated 1.6.84 as per directions of

Hon'ble Apex Court in Inder Pal Yadav & others vs. Union

of India & others (1985) 2 SCC 648. The management

has submitted that as per modified date of grant of

temporary status. The workmen were screened and posted

as Gangman and is in fruitful employment of the opposite

party for last 20 years, thus, raising the present industrial

disputes after lapse of 20 long years makes it time barred

hence, not maintanable in the eye of law. It is specifically

submitted by the management that the workman has been

engaged as project casual labour and as per existing

Railway Rules 360 days' continuous service is required for

grant of temporary status, therefore, the claim of the

workmen for grant of temporary status after 120 days is not

maintainable and liable to be rejected. Accordingly, the

management has prayed that the claim of the workman's

union be rejected being devoid of any merit.

5. The workman's union has filed its rejoinder wherein

apart from reiterating facts already mentioned in the

statement claim has submitted that the workman under

dispute has not been appointed in any project, therefore,

decision of Hon'ble Apex Court in Inder Pal Yadav case

(supra) is not applicable on him and he should be granted

temporary status after completion of 120 days of service.

6. The workman's union has not filed any documentary

evidence in support of its claim; rather it has stated that

the Casual Labour Card in respect of the workman and his

Service Book, is with the employers, in original.

The management has filed photocopy of Casual Labour

Card and Service Book in respect of workman.

7. The workman's union has examined workman, whereas

the management examined Sri Sita Ram Sonkar, APO in

support of their claim. The parties availed opportunity to

cross-examine the each other's witnesses apart from putting

oral arguments as well as written arguments.

8. Heard learned authorized representatives of the parties

and perused entire evidence on record.

9. The authorized representative of the workman has

contended that the workman was not project Casual Labour,

rather he was Casual Labour engaged in construction

division/unit. Therefore, he was eligible for grant of

¹Hkkx IIó[k.M 3(ii)º

Hkkjr dk jkti=k % vDrwcj 10] 2015@vkf'ou 18] 1937

4053

temporary status from the date he completed 120 days of

service. The railway administration instead treated him as

project casual labour and granted him temporary status

after lapse of five years which is unfair labour practice. It is

also contended that the decisions of the Hon'ble Supreme

Court in Indra Pal Yadav case (supra) is not applicable on

the workman. The workman's union has relief on:

(i) Union of India vs. Presiding Officer, CGIT-cum-

Labour Court, Kanpur Nagar & another 2008 (116)

FLR 1046.

(ii) Union of India & others vs. Basant Lal & others

1992 SCC (L&S) 611.

(iii) L. Robert D'Souza vs. Executive Engineer, Southern

Railway & another 1982 SCC (L&S) 124.

(iv) N. Balakrishnan vs. M. Krishnamurthy ACJ 1998

1347 SC.

(v) Kuldeep Singh vs. GM, Instrument Design

Development and Facilities Centre & another 2011

(128) FLR 121.

(vi) Din Mohammed (Dead) by LRs. vs. Union of India

& others 2002 (92) FLR 1216.

(vii) The Union of India & another vs. Girija Shankar &

others 2003 (96) FLR 1094.

10. In rebuttal, the authorized representative of the

managemet has contended that the workman has been

project casual labour in construction unit and worked with

intermittent gap and he was granted temporary status as

per Railway Board's letter dated 01.06.84. It has been

submitted that the Railway Board vide its letter dated

11.09.86 modified the date of temporary status to the

workmen in view of decision given by Hon'ble Supreme

Court in Indra Pal Yadav case (supra). The management

has contended that the workman was not entitled for grant

of temporary status after completion of 120 days

continuous service since he was engaged as project casual

labour and as per existing Railway Rules, 360 days'

continuous services is required for grant of temporary status

to a project casual labour. The authorized representative of

the management has also contended that the workman has

turned up after lapse of more than 20 years and his cause is

not tenable in the eye of law being time barred. The

management has relied on Inder Pal Yadav & others vs.

Union of India (1985) 2 SCC 648.

11. I have given my thoughtful consideration to the

rival submission of the learned authorized representatives

of the parties and scanned entire evidence on record in

light thereto.

12. The workman has come up with a case that he has

been engaged as casual labour in the Construction Unit of

the Dy. Chief Engineer (Construction), Northern Railway,

Lucknow and he was entitled for grant of temporary status

on completion of 120 days of service under P.S.N 7850

Master Circular 48/92 and Rule 2304, 2501 and 2511 of Indian

Railway Establishment Manual; but the management

granted him temporary status after five years' of their

appointment, amounting to unfair labour practice. The

workman's union has not filed any documentary evidence

in support of their case; rather it has pleaded that the same

is in power and possession of the Railways.

13. The management of the Northern Railway, rebutting

the claim of the workman's union has come up with a clear

that the workman had been engaged as Project Casual

Labour and accordingly, he was entitled for grant of

temporary status on completion of 360 days continuous

service, and accordingly, he was greated vide Railway

Board's letter dated 01.06.84. Later on with decision of

Hon'ble Apex Court in Inder Pal Yadav case (supra), the

date of grant of temporary status was modified vide Railway

Board's letter dated 11.09.86 whereby the workmen were

given temporary status from previous date. The

Management has also stressed upon the factum of delay

in raising the present industrial dispute after lapse of more

than 20 years. The authorized representative of the

management has pointed out that the workman is working

with the railways for decades; but neither he preferred any

represenatation, on the issue; nor moved to the court for

redressal of his grievances. It is also stressed by the

management that the workman has raised the present

industrial dispute at a highly belated stage without any

explanation to the delay. It has also been argued that though

there is no limitation in the I.D. Act, 1947, but the same

should not be condoned for the want of any explanation

from the workman's union. He has also submitted that the

Hon'ble Apex Court in number of its verdicts has observed

that Courts should exercise their discretion, judiciously,

while condoning the delay.

14. The workman's union has adduced evidence of the

workman who stated in his cross-examination that he had

been appointed as casual labour on 28.04.79 and he was

granted temporary status w.e.f. 01.01.1983. Thereafter he

admitted grant of temporary status w.e.f. 01.01.83.

15. The workman has not field any documentary proof

in support of their claim but has relied on the photocopy of

the service record and casual labour card of the workman,

filed by the management. The service record of the workman

shows the entry regarding grant of temporary status to the

workman of different dates and there after grant of revised

temporary status from different dates as per Railway Board's

circular dated 11.9.86. The photocopy of the casual labour

card, filed by the management has details regarding working

of the workman with Permanent Way Inspector

(Construction) at different-different stations.

Thus, both the parties have relied on the same set of

documents in support of their different stands.

4054

THE GAZETTE OF INDIA : OCTOBER 10, 2015/ASVINA 18, 1937

[PART II—SEC. 3(ii)]

16. After going through the rival pleadings of the parties

and documentary and oral evidence relied upon by the

parties the bone of contention is as to whether the workman

was Project casual labour or just casual labour engaged in

the railway administration. Had they been Project Casual

Labour then the action of the management was right and if

they were casual labour on the rolls of railways then they

ought to have been granted temporary status on

completion of 120 days continuous service.

The burden that lied upon the workman's union was to

came with the evidence that the workman was engaged as

casual labour and he completed 120 days continuous service

on this particular date, making him entitled for grant of

temporary status. Thus, it was for the workman's union to

lead its evidence on two points firstly that the workman

was engaged as Casual Labour and secondly that he

commpleted 120 day's of continuous working on such and

such date. But the workman failed to comply with the above

requirement. As it relied on the documentary evidence i.e.

casual labour card which was in power and possession of

the management for working detail; but when the

management filed the photocopy of the same then it neither

calculated the 120 days' continuous working from it nor

disputed its genieness. This goes to upheld the stand taken

by the management that the workman was Project Casual

Labour and accordingly he was granted temporary status

on completion of 360 days' of continuous working vide

Railway Board's letter dated 01.06.84 and thereafter granted

them revised temporary status from a back vide letter dated

11.09.86 as per guidelines of Hon'ble Apex Court.

17. The workman has relied on Union of India vs.

Presiding Officer, CGIT-cum-Labour Court, Kanpur Nagar

& another which pertains to termination of services of a

workman in violation of provisions of Section 25 F, G & H

of the Act. However, the facts of the present case are entirely

different; hence not applicable in the present case. The

workman has also relied on the Union of India and others

vs. Basant Lal & others 1992 SCC (L&S) 611; wherein the

Hon'ble Apex Court has held that a workman having

completed 120 days of working becomes entitled for

regularization as temporary worker and the Railway cannot

deny them the temporary status on the ground that they

had been appointed as casual labour on a project work and

not on construction work on open line and as such they

would acquire the temporary status only after completing

360 days of service. But in the present case the workman's

union failed to specify the date when the different workman

completed 120 days' of continuous service, rendering them

for grant of temporary status. The workman's union has

also relied on L.Robert D'Souza vs Execulve Engineer,

Southern Railway & another 1982 SCC (L&S) 124 but the

fact of the case law is entirely different from the present

case hence not applicable. Likewise the facts of the case

law relied upon by the workman in the Union of India &

another vs. Girja Shankar & others 2003 (96) FLR 1094,

Kuldeep Singh vs. GM Instrument Design Development

and Facilities Centre & another 2011 (128) FLR 123 and Din

Mhammaed (Dead) by LRs. Vs. Union of India & others

2002 (992) FLR 1216 are quite different from the facts of the

present case hence not appreciable.

18. It is well settled that if a party challenges the legality

of an action, the burden lies upon him to prove illegality of

the action; and if no evidence is produced, the party

invoking jurisdiction of the court must fail. In the present

case burden was on the workman's union to set out the

grounds to challenge the validity of the action of the

management in not granting the temporary status to the

workman after completion of 120 days' of continuous

working. For this the burden of proof was on the workman's

union to come with the evidence, that the workman under

dispute has been engaged by the management of Railways

as casual labour and under Rules they were entitled for

grant of temporary status from completion of 120 days

services with the employers; but the workman's union has

filed to discharge the burned that lied upon them. The

workman's union made a pleading, to explain the reason

why it is not in position to file any documentary evidence

before this Tribunal, in their statement of claim on the effect

that the relevant document in support of their claim i.e.

Casual Labour Card is attached in their Service Book. The

workman's union in its rejoinder required the management

to produce Casual Labour Card in respect of the workman

before this Tribunal, resultantly, the management filed

photocopy of Casual Labour Card and Services Book in

respect of the workman. The workman's union did not

dispute the service details filed by the management i.e.

Casual Labour Card and extracts of service Book. Therefore,

when the management has filed the photocopy of Casual

Labour Card as desired by the workman's union it was

incumbent upon the workman's union to come forward and

sort out the relevant extract of the Casual Labour Card,

which bears working details i.e. working period and

numbers of days, to show that the workman completed 120

days of continuous on such and such date he was entitled

for grant of temporary status from such date. But the

workman has utterly failed to bring any evidence to the

effect before this Tribunal that the workman was engaged

as Casual Labour and that the workman was casual labour

and it also failed to specify the date as to when the workman

completed 120 days' of continuous working, making him

eligible for grant of temporary status.

19. On the contrary the management has come with a

clear cut case that the workman was engaged as Project

Casual Labour with Construction Unit. It is also contended

by the learned authorized representative of opposite party

that there are so many projects which go on with the

Construction Unit and the workman were kept engaged in

different projects. It is also specifically pleaded and proved

by the management that the workman was granted

temporary status vide Railway Board's letter dated 01.06.84;

but due to Supreme Court's direction in Indra Pal Yadav

Case (supra), the Railway Board vide its letter dated 11.09.86,

¹Hkkx IIó[k.M 3(ii)º

Hkkjr dk jkti=k % vDrwcj 10] 2015@vkf'ou 18] 1937

4055

changed the date of grant of Temporary status, as per

modified policy and accordingly, reduced the date of

Temporary Status through notice. The management has

filed photocopy of Service Record in respect of workman,

which bears entries regarding grant of temporary status to

the workman.

20. The management has made a specific pleading to

the effect that the claim of the workman's union is stale one

and time barred as the union has preferred the case before

this Tribunal after lapse of more than 20 years. The

workman's union in rebuttal has submitted that there is no

provision regarding limitation in the Industrial Disputes

Act, 1947; hence their claim is maintainable.

In this regard the workman's union has relied on

N. Balakrishnan vs. M. Krishnamurthy 1998 ACJ 1347;

wherein Hon'ble Apex Court while dealing with the matter

delay has observed that length of delay does not matter,

acceptability of the explanation is the only criterion. But

the workman's union has not given any explanation in its

pleadings as to what prevented them to raise an industrial

dispute at an early state. However, in the evidence it has

been stated that the workman/union wrote many letters to

the opposite parties and the same are pending with them;

although no copy of such letter/representation finds its

reference either on record or annexure with the affidavit.

Moreover, the management witness vide para 9 of his

affidavit has denied of submissions of any such application

by the workmen.

In Chennai Metropolitan Water Supply and Sewerage

Board & others vs. T.T. Murali Babu 2014 (141) FLR 772,

Hon'ble Apex Court has observed as under:

"The Court should bear in mind that it is exercising

an extraordinary and equitable jurisdiction. As a

Constitutional Court it has a duty to protect the rights

of the citizens but simultaneously it is to keep itself

alive to the primary principle that when an aggrieved

person, without adequate reasons, approaches the

Court at his own leisure or pleasure, the Court would

be under legal obligation to scrutinize whether the

lis at a belated stage should be entertained or not. Be

it noted, delay comes in the way of equiry. In certain

circumstances delay and laches may be fatal but in

most circumstances inordinate delay would only

invite disaster for the litigant who knocks at the doors

of the Court. Delay reflects inactivity and inaction

on the part of a litigant- a litigant who has forgotten

the basic norms, namely, "procrastination is the

greatest thief of time" and second, law does not permit

one to sleep and rise like a phoenix. Delay does bring

a hazard and casues injury to the lis. In the case at

hand, though there has been four years' delay in

approaching the Court, yet the writ Court chose not

to address the same. It is the duty of the Court to

scrutinize whether such enormous delay is to be

ignored without any justification."

Further, in Dr. Jawahal Lal Rohatgi Memorial Eye Hospital

vs. State of U.P. & others 2013 (138) FLR 11 Hon'ble

Allahabad High Court upholding the action of the State

Government in denying the making reference of case after

22 years held that it is not expedient for State government

to refer against order of termination dated 26.6.1982 being

old and stale case, where the workman filed an application

raising industrial dispute after 22 years in 2004. Hon'ble

High Court observed that there is nothing to indicate as to

why the workman could not approach the authority under

the ID Act.

Thus, from the fact of record it is crystal clear the

workman did not bother to approach the management or

any legal forum for redressal of his grievances for more

than 20 years; and the explanation forwarded by the

workman's union before this tribunal is insufficient.

21. Hence, from the facts and circumstances of the case

and law cited hereinabove; I am of considered opinion that

the action of the management of Northern Railway, Lucknow

in not giving temporary status to the workman, Shri Jag

Prasad, from the alleged date of completion of 120 days of

service is neither illegal nor unjustified. Accordingly, I come

to the conclusion that the workman's union is not entitled

to any relief.

22. The reference under adjudication is answere

accordingly.

23. Award as above.

Lucknow.

22nd September, 2015.

RAKESH KUMAR, Presiding Officer

ubZ fnYyh] 5 vDrwcj] 2015

dk-vk- 1969-—vkS|ksfxd fookn vf/kfu;e] 1947 ¼1947

dk 14½ dh /kkjk 17 ds vuqlj.k esa dsUnzh; ljdkj mÙkj jsyos ds

izca/kra= ds lac) fu;kstdksa vkSj muds deZdkjksa ds chp vuqca/k esa

fufnZ"V vkS|ksfxd fookn esa dsUnzh; ljdkj vkS|ksfxd vf/kdj.k]

y[kuÅ ds iapkV ¼lanHkZ la[;k 21@2010½ dks izdkf'kr djrh gS] tks

dsUnzh; ljdkj dks 05@10@2015 dks izkIr gqvk FkkA

[la- ,y&41011@123@2009&vkbZ vkj ¼ch&I ½]

lqefr ldykuh] vuqHkkx vf/kdkjh

New Delhi, the 5th October, 2015

S.O. 1969.—In pursuance of Section 17 of the Industrial

Disputes Act, 1947 (14 of 1947), the Central Government

hereby publishes the Award (Ref. No. 21/2010) of the Cent.

Govt. Indus. Tribunal-cum-Labour Court Lucknow as

shown in the Annexure, in the industrial dispute between

the management of Northern Railway and their workmen,

received by the Central Government on 05/10/2015.

[No. L-41011/123/2009-IR (B-I]

SUMATI SAKLANI, Section Officer

4056

THE GAZETTE OF INDIA : OCTOBER 10, 2015/ASVINA 18, 1937

[PART II—SEC. 3(ii)]

ANNEXURE

CENTRAL GOVERNMENT INDUSTRIAL TRIBUNAL-

CUM-LABOUR COURT LUCKNOW

PRESENT :

SHRI RAKESH KUMAR, Presiding Officer

I.D. No. 21/2010

Ref. No. L-41011/123/2009-IR (B-I) dated: 08.11.2010

BETWEEN

Mandal Sangatan Mantri

Uttar Railway Karmchari Union

283/63, Kh Gadi Kannora

PO Manak Nagar

Lucknow

(Espousing cause of Shri Ram Kumar)

AND

1. Dy Chief Engineer (Construction)

Uttar Railway, Charbagh

Lucknow.

2. Deputy Chief Manager (Stores)

Northern Railway, Stores Depot

Alambagh, Lucknow

AWARD

1. By order No. L-41011/123/2009-IR (B-I) dated:

08.11.2010 the Central Government in the Ministry of

Labour, New Delhi in exercise of powers conferred by clause

(d) of sub section (1) and sub section (2A) of Section 10 of

the Industrial Disputes Act, 1947 (14 of 1947) referred this

industrial dispute between Mandal Sangatan Mantri, Uttar

Railways Employee Union, 283/63; Kh Gadi Kannora, PO.

Manak Nagar, Lucknow and the Dy. Chief Engineer

(Construction), Uttar Railway, Charbagh, Lucknow &

Deputy Chief Manager (Stores), Northern Railway, Stores

Depot, Alambagh, Lucknow to this CGIT-cum-Labour

Court, Lucknown for adjudication.

2. The reference under adjudication is:

"Whether the action of management of North Central

Railway, Allahabad/Kanpur in not giving Shri Ram

Kumar, T.No. 449 status of temporary from the date

of completion of 120 days of service in legal and

justified? If not, what relief the workman is entitled?"

3. The case of the workman's union, in brief, is that the

workman, Ram Kumar, has been engaged as casual labour

with in construction unit under opposite party No. 1 and is

presently working under opposite party No. 2. It has been

alleged by the workman's union that the workman under

dispute was to be given temporary status after completion

of 120 days of working as per P.S.N. 7850, Master Circular

48/92 and Rule 2304, 2501 and 2511 of Indian Railway

Establishment Manual; but they were granted temporary

status after five years' of their engagement, which is not

only unfair labour practice but also is against Article 21 of

the Constitution. Accordingly, the workman's union has

prayed that the workman concerned be granted temporary

status from the date they have completed 120 days's working

with consequential benefits.

4. The management of the North Central Railways has

filed its written statement denying the allegations of the

workman's union with submission that the workman under

dispute was initially engaged by them as Project Casual

Labour in Construction Unit with intermittent gap w.e.f.

24.04.79 and has been granted temporary status on 01.01.85

vide letter 220-E/3/Recruit dated 22/25.02.85. It has been

submitted that the railway formulated a scheme to provide

the temporary status to Project Casual Labour, circulated

vide No. E(NG)II/84/CL/41 dated 1.6.84 as per directions of

Hon'ble Apex Court in Inder Pal Yadav & others vs. Union

of India & others (1985) 2 SCC 648. The management has

submitted that as per modified date of grant of temporary

status, the workmen were screened and posted as Gangman

and is in fruitful employment of the opposite party for last

20 years, thus, raising the present industrial disputes after

lapse of 20 long years makes it time barred hence, not

maintainable in the eye of law. It is specifically submitted

by the management that the workman has been engaged

as project casual labour and as per existing Railway Rules

360 days' continuous service is required for grant of

temporary status, therefore, the claim of the workmen for

grant of temporary status after 120 days is not maintainable

and liable to be rejected. Accordingly, the management has

prayed that the claim of the workmans union be rejected

being devoid of any merit.

5. The workman's union has filed its rejoinder wherein

apart from reiterating facts already mentioned in the

statement claim has submitted that the workman under

dispute has not been appointed in any project, therefore,

decision of Hon'ble Apex Court in Inder Pal Yadav case

(supra is not applicable on him and he should be granted

temporary status after completion of 120 days of service.

6. The workman's union has not filed any documentary

evidence in support of its claim; rather it has stated that

the Casual Labour Court in respect of the workman and his

Service Book, is with the employers, in original.

The management has filed photocopy of Casual Labour

Card and Service Book in respect of workman.

7. The workman's union has examined workman; whereas

the management examined Sri Sita Ram Sonkar, APO in

support of their claim. The parties availed opportunity to

cross-examin the each other's witnesses apart from putting

oral arguments as well as written arguments.

8. Heard learned authorized representatives of the parties

and perused entire evidence on record.

¹Hkkx IIó[k.M 3(ii)º

Hkkjr dk jkti=k % vDrwcj 10] 2015@vkf'ou 18] 1937

4057

9. The authorized representative of the workman has

contended that the workman was not project casual labour;

rather he was casual labour engaged in construction

division/unit. Therefore, he was eligible for grant of

temporary status from the date he completed 120 days of

service. The railway administration instead treated him as

project casual labour and granted him temporary status

after lapse of five years which is unfair labour practice. It is

also contended that the decisions of the Hon'ble Supreme

Court in Indra Pal Yadav case (supra) is not applicable on

the workman. The workman's union has relied on:

(i) Union of India vs. Presiding Officer, CGIT-cum-

Labour Court, Kanpur Nagar & another 2008(116)

FLR 1046.

(ii) Union of India & Others vs. Basant Lal & others

1992 SCC (L&S) 611.

(iii) L. Robert D' Souza vs. Executive Engineer,

Southern Railway & another 1982 SCC (L&S) 124.

(iv) N. Balakrishnan vs. M. Krishnamurthy ACJ 1998

1347 SC,

(v) Kuldeep Singh vs. GM, Instrument Design

Development and Facilities Centre & another 2011

(128) FLR 121.

(vi) Din Mohammed (Dead) by LRS. vs. Union of India

& others 2002 (92) FLR 1216.

(vii) The Union of India & another vs. Grija Shankar &

others 2003 (96) FLR 1094.

10. In rebuttal, the authorized representative of the

management has contended that the working has been

project casual labour in construction unit and worked with

intermittent gap and he was granted temporary status as

per Railway Board's letter dated 01.06.86. It has been

submitted that the Railway Board vide its letter date 11.09.86

modified the date of temporary status to the workman in

view of decision given by Hon'ble Supreme Court in Indra

Pal Yadav case (supra). The management has contended

that the workman was not entitled for grant of temporary

status after completion of 120 days continuous service

since he was engaged as project casual labour and as per

existing Railway Rules, 360 days' continuous services is

required for grant of temporary status to a project casual

labour. The authorized representatives of the management

has also contended that the workman has turned up after

lapse of more than 20 years and his cause is not tenable in

the eye of law being time barred. The management has

relief on Indra Pal Yadav & others vs. Union of India (1985)

2 SCC, 648.

11. I have given my thoughtful consideration to the

rival submissions of the learned authorized representatives

of the parties and scanned entire evidence on record in

light thereto.

12. The workman has come up with a case that he has

been engaged as casual labour in the Construction Unit of

the Dy. Chief Engineer (Construction), Northern Railway,

Lucknow and he was entitled for grant of temporary status

on completion of 120 days of service under P.S.N. 7850,

Master Circular 48/92 and Rule 2304, 2501 and 2511 of Indian

Railway Establishment Manual; but the management

granted him temporary status after five years' of their

appointment, amounting to unfair labour practice. The

workman's union has not filed any documentary evidence

in support of their case; rather it has pleaded that the same

is in power and possession of the Railways.

13. The management of the Northern Railways, rebutting

the claim of the workman's union has come up with a clear

cut case that the workman had been engaged as Project

Casual Labour and accordingly, he was entitled for grant

of temporary status on completion of 360 days continuous

service; and accordingly, he was granted vide Railway

Board's letter dated 01.06.84. Later on with decision of

Hon'ble Apex Court in Indra Pal Yadav case (supra), the

date of grant of temporary status was modified vide Railway

Board's letter dated 11.09.86 whereby the workmen were

given temporary status from previous date. The

management has also stressed upon the facutm of delay in

raising the present industrial dispute after lapse of more

than 20 years. The authorized representative of the

management has pointed out that the workman is working

with the railways for decades; but neither he preferred any

representation, on the issue; nor moved to the court for

redressal of his grievances. It is also stressed by the

management that the workman has raised the present

industrial dispute at a highly belated stage without any

explanation to the delay. It has also been argued that though

there is no limitation in the I.D. Act, 1947; but the same

should not be condoned for the want of any explanation

from the workman's union. He has also submitted that the

Hon'ble Apex Court in number of its verdicts has observed

that Courts should exercise their discretion, judiciously,

while condoning the delay.

14. The workman's union has adduced evidence of the

workman who stated in his cross-examination that he had

been appointed as casual labour in 1978 and he was granted

temporary status w.e.f. in 1994. Thereafter he admitted grant

of temporary status w.e.f. 1.1.81. The workman admitted

the photocopy of service record and casual labour card,

filed by the management, from paper No. M-9.

15. The workman has not filed any documentary proof

in support of their claim but has relied on the photocopy of

the service record and casual labour card of the workman,

filed by the management. The service record of the workman

shows the entry regarding grant of temporary status to the

4058

THE GAZETTE OF INDIA : OCTOBER 10, 2015/ASVINA 18, 1937

[PART II—SEC. 3(ii)]

workman of different dates and there after grant of revised

temporary status from different dates as per Railway Board's

circular dated 11.9.86. The photocopy of the casual labour

card, filed by the management has details regarding working

of the workman with Permanent Way Inspector

(Construction) at different-different stations.

Thus, both the parties have relied on the same set of

documents in support of their different stands.

16. After going through the rival pleadings of the parties

and documentary and oral evidence relied upon by the

parties the bone of contention is as to whether the workman

was Project casual labour or just casual labour engaged in

the railway administration. Had they been Project Casual

Labour then the action of the management was right and if

they were casual labour on the rolls of railways then they

ought to have been granted temporary status on

completion of 120 days continuous service.

The burden that lied upon the workman's union was to

come with the evidence that the workman was engaged as

Casual Labour and he completed 120 days continuous

service on this particular date, making him entitled for grant

of temporary status. Thus, it was for the workman's union

to lead its evidence on two points firstly that the workman

was engaged as Casual Labour and secondly that he

completed 120 day's of continuous working on such and

such date. But the workman failed to comply with the above

requirement. As it relied on the documentary evidence i.e.

casual labour card which was in power and possession of

the management for working detail; but when the

management field the photocopy of the same then it neither

calculated the 120 days' continuous working from it nor

disputed its genuineness. This goes to upheld the stand

taken by the management that the workman was Project

Casual Labour and accordingly he was granted temporary

status on completion of 360 days' of continuous working

vide Railway Board's letter dated 01.06.84 and thereafter

granted them revised temporary status from a back date

vide letter dated 11.09.86 as per guidelines of Hon'ble Apex

Court.

17. The workman was relied on Union of India vs.

Presiding Officer, CGIT-cum-Labour Court, Kanpur Nagar

& Another which pertains to termination of services of a

workman in violation of provisions of Section 25F, G & H

of the Act. However, the facts of the present case are entirely

different; hence not applicable in the present case. The

workman has also relied on Unoin of India & Others Vs.

Basant Lal & Others 1992 SCC (L&S) 611; wherein the

Hon'ble Apex Court has held that a workman having

completed 120 days of working becomes entitled for

regularization as temporary worker and the Railway cannot

deny them the temporary status on the ground that they

had been appointed as casual labour on a project work and

not on construction work on open line and as such they

would acquire the temporary status only after completing

360 days of service. But in the present case the workman's

union failed to specify the date when the different workem

completed 120 days' of continous service, rendering them

for grant of temporary status. The workman's union has

also relied on L. Robert D'Souza Vs. Executive Engineer,

Southern Railway & Another 1982 SCC (L&S) 124 but the

fact of the case law is entirely different from the present

case hence not applicable. Likewise the facts of the case

law relied upon by the workman in the Union of India &

Another Vs. Girja Shankar & Others 2003 (96) FLR 1094,

Kuldeep Singh Vs. GM Instrument Design Development

and Facilities Centre & Another 2011 (128) FLR 123 and

Din Mhammaed (Dead) By LRs. Vs. Union Of India & Others

2002 (992) FLR 1216 are quite different from the fact of the

present case hence not appreciable.

18. It is well settled that if a party challenges the legality

of an action, the burden lies upon him to prove illegality of

the action; and if no evidence is produced, the party invoking

jurisdiction of the court must fail. In the present case burden

was on the workman's union to set out the grounds to

challenge the validity of the action of the management in not

granting the temporary status to the workman after

completion of 120 days of continuous working. For this the

burden of proof was on the workman's union to come with

the evidence, that the workman under dispute has been

engaged by the management of Railways as casual labour

and under Rules they were entitled for grant temporary status

from competion of 120 days services with the employers;

but the workman's union has failed to discharge the burden

that lied upon them. The workman's union made a pleading,

to explain the reason why it is not in position to file any

documentry evidence before this Tribunal, in their statement

of claim the effect that the relevant document in support of

their claim i.e. Casual Labour Card is attached in their Service

book. The workman's union in its rejoinder required the

management to produce Casual Labour Card in respect of

the workman before this Tribunal, resultantly, the

management filed photocopy of Casual Labour Card and

Services Book in respect of the workman. The workman's

union did not dispute the service details filed by the

management i.e. Casual Labour Card and extracts of Service

Book. Therefore, when the management has field the

photocopy of Casual Labour Card as desired by the

workman's union then it was incumbent upon the workman's

union to come forward and sort out the relevant extract of

the Casual Labour Card, which bears working details i.e.

working period and number of days, to show that the

workman completed 120 days of continuous on such and

such date and he was entitled for grant of temporary status

from such date. But the workman has utterly failed to bring

any evidence to the effect before this Tribunal that the

workman was engaged as Causal Labour and that the

workman was casual labour and it also failed to specify the

date as to when the workman completed 120 days' of

continuous working, making him eligible for grant of

temporary status.

¹Hkkx IIó[k.M 3(ii)º

Hkkjr dk jkti=k % vDrwcj 10] 2015@vkf'ou 18] 1937

4059

19. On the contrary the management has come with a

clear cut case that the workman was engaged as Project

Casual Labour with Construction Unit. It is also contended

by the learned authorized representative of opposite party

that there are so many projects which go on with the

Construction Unit and the workmen were kept engaged in

different Projects. It is also specifically pleaded and proved

by the management that the workman was granted

temporary status vide Railway Board's letter dated 01.06.84;

but due to Supreme Court's direction in Indra Pal Yadav

Case (supra), the Railway Board vide its letter dated 11.09.86,

changed the date of grant of temporary status, as per

modified policy and accordingly, reduced the date of

Temporary Status through notice. The management has

filed photocopy of Service Record in respect of workman,

which bears entries regarding grant of temporary status to

the workman.

20. The management has made a specific pleading to

the effect that the claim of the workman's union is stale one

and time barred as the union has preferred the case before

this Tribunal after lapse of more than 20 years. The

workman's union in rebuttal has submitted that there is no

provision regarding limitation in the Industrial Disputes

Act, 1947; hence their claim is maintanable.

In this regard the workman's union has relied on

N. Balakrishnan VS M. Krishnamurthy 1998 ACJ 1347;

wherein Hon'ble Apex Court while dealing with the matter

delay has observed that length of delay does not matter,

acceptability of the explanation is the only criterion. But

the workman's union has not given any explanation in its

pleadings as to what prevented them to raise an industrial

dispute at an early state. However, in the evidence it has

been stated that the workman/union wrote many letters to

the opposite parties and the same are pending with them;

although no copy of such letter/representation finds its

reference either on record or annexure with the affidavit.

Moreover, the management witness vide para 9 of his

affidavit has denied of submissions of any such application

by the workmen.

In Chennai Metropolitan Water Supply and Sewerage

Board & Others Vs. T.T. Murali Babu 2014 (141) FLR 772,

Honble Apex Court has observed as under:

"The Court should bear in mind that it is exercising

an extraordinary and equitable jurisdiction. As a

Constitutional Court it has a duty to protect the rights

of the citizens but simultaneously it is to keep itself

alive to the primary principle that when an aggrieved

person, without adequate reason, approaches the

Court at his own leisure or pleasure, the Court would

be under legal obligation to scrutinize whether the

lis at a belated stage should be enterained or not. Be

it noted, delay comes in the way of equity. In certain

circumstances delay and laches may be fatal but in

most circumstances inordinate delay would only

invite disaster for the litigant who knocks at the doors

of the Court. Delay reflects inactivity and inaction

on the part of a litigant—a litigant who has forgotten

the basic norms, namely "procrastination is the

greatest thief of time" and second, law does not permit

one to sleep and rise like a phoenix. Delay does bring

a hazard and causes injury to the lis. In the case at

hand, though there has been four years' delay in

approaching the Court, yet the writ Court chose not

to address the same. It is the duty of the Court to

scrutinize whether such enormous delay is to be

ignored without any justification."

Further, in Dr. Jawahar Lal Rohatgi Memorial Eye

Hospital Vs. State of U.P. & Others 2013 (138) FLR 11 Hon'ble

Allahabad High Court upholding the action of the State

Government in denying the making reference of case after

22 years held that it is not expedient for State Government

to refer against order of termination dated 26.6.1982 being

old and stale case, where the workman filed an application

raising industrial dispute after 22 years in 2004. Hon'ble

High Court observed that there is nothing to indicate as to

why the workman could not approach the authority under

the ID Act.

Thus, from the face of record it is crystal clear the

workman did not bother to approach the management or

any legal forum for redressal of his grievances for more

than 20 years; and the explanation forwarded by the

workman's union before this Tribunal is insufficient.

21. Hence, from the facts and circumstances of the case

and law cited hereinabove; I am of considered opinion that

the action of the management of Northern Railway, Lucknow

in not giving temporary status to the workman, Shri Ram

Kumar, from the alleged date of completion of 120 days of

service is neither illegal nor unjustified. Accordingly, I come

to the conclusion that the workman's union is not entitled

to any relief.

22. The reference under adjudication is answered

accordingly.

23. Award as above.

LUCKNOW.

RAKESH KUMAR, Presiding Officer

22nd September, 2015.

ubZ fnYyh] 5 vDrwcj] 2015

dk-vk- 1970-—vkS|ksfxd fookn vf/kfu;e] 1947 ¼1947

dk 14½ dh /kkjk 17 ds vuqlj.k esa dsUnzh; ljdkj mÙkj jsyos ds

izca/kra= ds lac) fu;kstdksa vkSj muds deZdkjksa ds chp vuqca/k esa

fufnZ"V vkS|ksfxd fookn esa dsUnzh; ljdkj vkS|ksfxd vf/kdj.k]

y[kuÅ ds iapkV ¼lanHkZ la[;k 37@2011½ dks izdkf'kr djrh gS] tks

dsUnzh; ljdkj dks 05@10@2015 dks izkIr gqvk FkkA

[la- ,y&41011@106@2010&vkbZvkj ¼ch&I½]

lqefr ldykuh] vuqHkkx vf/kdkjh

4060

THE GAZETTE OF INDIA : OCTOBER 10, 2015/ASVINA 18, 1937

[PART II—SEC. 3(ii)]

New Delhi, the 5th October, 2015

S.O. 1970.—In pursuance of Section 17 of the Industrial

Disputes Act, 1947 (14 of 1947), the Central Government

hereby publishes the Award (Ref. No. 37/2011) of the Cent.

Govt. Indus. Tribunal-cum-Labour Court, Lucknow as

shown in the Annexure, in the industrial dispute between

the management of Northern Railway and their workmen,

received by the Central Government on 05/10/2015.

[No. L-41011/106/2010-IR (B-I)]

SUMATI SAKLANI, Section Officer

ANNEXURE

CENTRAL GOVERNMENT INDUSTRIAL TRIBUNAL-

CUM-LABOUR COURT, LUCKNOW

PRESENT :

RAKESH KUMAR, Presiding Officer

I.D. No. 37/2011

Ref. No. L-41011/106/2010-IR(B-1) dated: 14.03.2011

BETWEEN

Mandal Sangthan Mantri

Uttar Railway Karmchari Union

283/63 Kh, Garhi Kananora (Premwati Nagar)

PO-Manak Nagar

Lucknow-16.

(Espousing cause of Shri Jai Lakhan Dixit)

AND

Senior Divisional Railway Manager (Personnel)

Northern Railway, Hazratganj

Lucknow.

AWARD

1. By order No. L-41011/106/2010-IR(B-I) dated:

14.03.2011 the Central Government in the Ministry of

Labour, New Delhi in exercise of powers conferred by clause

(d) of sub-section (1) and sub-section (2A) of Section 10 of

the Industrial Disputes Act, 1947 (14 of 1947) referred this

industrial dispute between Mandal Sangthan Mantri, Uttar

Railway Karmchari Union, 283/63 Kh, Garhi Kananora

(Premwati Nagar), PO - Manak Nagar, Lucknow and Senior

Divisional Railway Manager (Personnel), Northern Railway,

Hazratganj, Lucknow for adjudication to this CGIT-cum-

Labour Court, Lucknow.

2. The reference under adjudication is:

"Whether the demand of the union regarding placing

Shri Jai Lakhan Dixit S/o. Shri M.L. Dixit, Assistant

Loco Pilot, Loco-shed, Lucknow in the penal of 1983-

84 above his juniors and grant of pay benefits

accordingly is legal and justified? To what relief the

union is entitled?"

3. The case of the workman's union, in brief, is that the

workman, was appointed as cleaner w.e.f. 01.01.1976 and

worked as such till 03.09.1981 continuously, when he had

been retrenched w.e.f. 04.09.1981 illegally. The workman

challenged his retrenchment before CGIT-cum-Labour

Court, Kanpur in I.D. No. 48/83 and 163/1983 and the

Tribunal was pleased to reinstate the workman with back

wages from the date of retrenchment vide their award dated

19.02.1987 and 25.11.1985. The management challenged the

award of CGIT, Kanpur before Hon'ble High Court, which

was rejected; likewise the SLP too before Hon'ble Apex

Court was rejected; accordingly, the workman was

reinstated on 03.08.1983. It is alleged that the management

vide its order No. 220 E/1-5/Screening/Loco dated 30.08.1991

regularized the workman on the post of Loco Cleaner;

whereas it absorbed other junior workmen in the panel for

the year 1983-84 on the basis of 120 days working up to

30.09.1998, which is in violation to the provisions of Railway

Rules. It is submitted by the workman's union that Shri

Amarjeet Singh & Shri Abdul Aziz were also included in

the panel for year 1992 but later on included in the panel of

year 1983-84 on the orders of Hon'ble CAT, Lucknow.

Likewise, other workman viz. Sri Pratap Bahadur & Ahmad

Ali, who were earlier included in panel for the year 1992

were included in the panel for year 83-84 as per order of

this Tribunal. Accordingly, the workman's union has prayed

that the name of the workman, be included in the panel of

the year 1983-84 which consequential benefits.

4. The management of the railways has filed its written

statement, denying the claim of the workman's union and

has contended that the workman's union has sought the

relief placing the name of the workman in the panel of year

1983-84, which is not permissible because of the seniority

of other employees will be effected and they are not arrayed

as party in present industrial dispute and if the reliefis

granted, several other workers may prefer the matter in

courts since their seniority shall be effected. The

management has specifically submitted that the industrial

dispute has been referred after lapse of mroe than 25 years

without any rhyme or reason or any sufficient explanation;

and accordingly, the same is liable to be rejected on the

point of limitation.

5. The workman's union has filed its rejoinder wherein

apart from reiterating facts already mentioned in the

statement claim has submitted that there is no limitation

provided in the Industrial Disputes Act, 1947.

6. The parties filed documentary as well as oral evidence

in support of their respective case and forwarded oral

arguments.

7. Heard learned authorized representatives of the parties

at length and perused entire evidence on record.

8. The authorized representative of the workman has

contended that since the termination dated 04.09.81 has

¹Hkkx IIó[k.M 3(ii)º

Hkkjr dk jkti=k % vDrwcj 10] 2015@vkf'ou 18] 1937

4061

been held illegal and the workman had been reinstated

with consequential benefits, therefore he is entitled for

inclusion in the panel of year 1983-84. He has relied upon:

(i) N. Balakrishnan VS. M. Krishnamurthy 1998 ACJ

1347.

9. In rebuttal, the authorized representative of the

management has contended that the workman was screened

and rightly placed in the seniority panel vide order dated

30.08.1991. The management has vehemently contended

that the workman is not entitled to be included in the panel

for the year 1983-84, inasmuch as the present industrial

dispute is time barred and the workman has raised this

industrial dispute when he found that some other workmen

got benefit from different Court/Tribunals. The

management has relied on :

(i) M. Ramakotaiah & others Union of India & others

2007 (6) AWC 6656 (SC).

10. I have given my thoughtful consideration to the

rival contentions of the learned authorized representatives

of the parties and scanned the entire evidence available on

record.

11. Admittedly, the workman had been terminated w.e.f.

04.09.1981 and his termination had been declared to be

illegal and was reinstated with back wages by the CGIT-

cum-Labour Court, Kanpur. Also, the Hon'ble Court in writ

petition, filed by the management of railways, upheld the

award regarding reinstatement and the management in

compliance of award reinstated the workman and paid him

back wages. However, the management's contention over

the issue referred to this Tribunal is, that the workman was

screened and was rightly placed in the seniority panel for

1991 and he is not entitled for inclusion in the panel for

year 1983 as he was not in service at that point of time,

more so because the present industrial dispute has been

raised after lapse of more than 25 years.

12. Thus, the question to be adjudicated is as to whether

the workman is entitled to be included in the seniority

panel of 1983-84, which was denied to him, consequent

upon his termination in the said year? It is admitted fact

that the workman was not in service due to illegal termination

in the relevant year 1983, when the seniority panel was

drawn and his name was not considered. The termination

of the workman was quashed by the CGIT-cum-Labour

Court, Kanpur and in compliance thereof the management

reinstated the workman, treating the termination as notest

and paid back wages in compliance of the order of the

Hon'ble High Court.

As per award of the CGIT-cum-Labour Court, Kanpur,

the reinstatement order was not qualified one to be given

effect to the extent of monetary benefits only. As per settled

procedure, logically and legally reinstatment required grant

of all service benefits including seniority as if the

termination had not taken place. The management complied

with the order of reinstatement without giving seniority

and released monetary benefits to the workman. On the

quashing of termination order, it has to be assumed that

the workman was never been terminated and continued to

be in service notionally. The effect of the reinstatement is

that the workman would be deemed in service on the last

post held on the date of termination. Accordingly, he is

entitled for preference over his juniors and to be included

in the seniority panel for the year 1983-84.

13. The management of the railways has come up with a

contention that the present industrial dispute is time barred

as it has been raised after lapse of more than 25 years. The

workman's witness during his cross-examination stated that

he moved an application before DRM,but has not filed its

copy before this Tribunal. He further, stated that when the

management did not act upon his repeated representations,

then he raised the present industrial dispute. The authorized

representative has contended that the workman has not

given any reliable explanation for inordinate delay of 25

years; rather he turned up when the other got successful.

He stressed that the order of the Hon'ble CAT, Lucknow

Bench, Lucknow in respect of Amarjeet Singh was delivered

on 26.04.1993; but the workman has raised present industrial

dispute in 2011, without any explanation.

14. The management has relied upon N. Balakrishnan

VS M. Krishnamurthy 1998 ACJ 1347; wherein Hon'ble Apex

Court while dealing with the matter of delay has observed

that length of delay does not matter, acceptability of the

explanation is the only criterion.

In Chennai Metropolitan Water Supply and Sewerage

Board & others VS T.T. Murali Babu 2014 (141) FLR 772,

Honble Apex Court has observed as under:

"The Court should bear in mind that it is exercising

an extraordinary and equitable jurisdiction. As a

Constitutional Court it has a duty to protect the rights

of the citizens but simultaneously it is to keep itself

alive to the primary principle that when an aggrieved

person, without adequate reason, appraches the

Court at his own leisure or pleasure, the Court would

be under legal obligation to scrutinize whether the

lis at a belated stage should be entertained or not. Be

it noted, delay comes in the way of equity. In certain

circumstances delay and laches may be fatal but in

most circumstances inordinate delay would only

invite disaster for the litigant who knocks at the doors

of the Court. Delay reflects inactivity and inaction

circumstances inordinate delay would only invite

disaster for the litigant who knocks at the doors of

the Court. Delay reflects inactivity and inaction on

the part of a litigant — a litigant who has forgotten

the basic norms, namely, "procrastination is the

greatest theif of time" and second, law does not permit

4062

THE GAZETTE OF INDIA : OCTOBER 10, 2015/ASVINA 18, 1937

[PART II—SEC. 3(ii)]

one to sleep and rise like a phoenix. Delay does bring

a hazard and causes injury to the lis. In the case at

hand, though there has been four years' delay in

approaching the Court, yet the writ Court chosenot

to address the same. It is the duty of the Court to

scrutinize whether such enormous delay is to be

ignored without any justification."

Further, in Dr. Jawahar Lal Rohatgi Memorial Eye

Hospital VS State of U.P. & others 2013 (138) FLR 11

Hon'ble Allahabad High Court upholding the action of the

State Government in denying the making reference of case

after 22 years held that it is not expedient for State

government to refer against order of termination dated

26.6.1982 being old and stale case, where the workman

filed an application raising industrial dispute after 22 years

in 2004. Hon'ble High Court observed that there is nothing

to indicate as to why the workman could not approach the

authority under the ID Act. On the issue of delay the

workman has tried to explain his delay by pleading that be

kept on making representations before the authorities; but

in the absence of any copy there of his contention cannot

be relied upon. There is no other explanation about delay.

Thus, from the face of record it is crystal clear that the

workman did not bother to approach the management or

any legal forum for redressal of his grievances for more

than 20 years; and he approached this Tribunal when he

come to know about favourable order of courts in similar

nature of cases, which points out towards opportunities of

the workman. Moreover, the explanation forwarded by the

workman's union before this Tribunal is insufficient.

15. In the present case admittedly there is delay of

aproximately 20 years as he was screened vide order dted

30.08.1991. The workman's union failed to give any logical

explanation for this inordinate delay of 20 years. Hon'ble

Apex Court in Ajaib Singh VS. Sirhind Co-operative

Marketing-cum-Processing Services Society Ltd. & another

1999 LAB IC 1435 where there was admitted delay of sevent

years has held that the Court can mould relief by refusing

back wages or directing payment of part of back wages.

16. Thus, from the facts and circumstances of the case

and the case laws cited hereinabove, I am considered

opinon that the action of the management of Central

Railway in not including the name of the workman in the

panel for year 1983-84 was illegal and unjustified.

Accordingly, I come to the conclusion that the workman,

Shri Jai Lakhan Dixit is entitled for placement in the panel

of 1983-84 above his juniors, subject to his suitability under

Rules. He shall be entitled to services benefits under Rules;

however, he would be liable for payment of only 1/3rd back

wages, in view of delay in raising the present industrial

dispute.

17. The reference under adjudication is answered

accordingly.

18. Award as above.

RAKESH KUMAR, Presiding Officer

LUCKNOW

16th September, 2015.

ubZ fnYyh] 5 vDrwcj] 2015

dk-vk- 1971-—vkS|ksfxd fookn vf/kfu;e 1947 ¼1947 dk

14½ dh /kkjk 17 ds vuqlj.k esa dsUnzh; ljdkj mÙkj jsyos ds izca/

kra= ds lac) fu;kstdksa vkSj muds deZdkjksa ds chp vuqca/k esa

fufnZ"V vkS|ksfxd fookn esa dsUnzh; ljdkj vkS|ksfxd vf/kdj.k]

y[kuÅ ds iapkV ¼lanHkZ la[;k 23@2010½ dks izdkf'kr djrh gS] tks

dsUnzh; ljdkj dks 5@10@2015 dks izkIr gqvk FkkA

[lañ ,y&41011@107@2009&vkbZvkj ¼ch&I½]

lqefr ldykuh] vuqHkkx vf/kdkjh

New Delhi, the 5th October, 2015

S.O. 1971.—In pursuance of Section 17 of the Industrial

Disputes Act, 1947 (14 of 1947), the Central Government

hereby publishes the Award (Ref. No. 23/2010) of the Cent.

Govt. Indus.Tribunal-cum-Labour Court, Lucknow as

shown in the Annexure in the Industrial dispute between

the management of Northern Railway and their workmen,

received by the Central Government on 5/10/2015.

[No. L-41011/107/2009-IR(B-I)]

SUMATI SAKLANI, Section Officer

ANNEXURE

CENTRAL GOVERNMENT INDUSTRIAL TRIBUNAL-

CUM-LABOUR COURT, LUCKNOW

PRESENT :

Shri Rakesh Kumar, Presidding Officer

I.D. No. 23/2010

Ref. No. L-41011/107/2009-IR (B-I) dated: 09.11.2010

BETWEEN

Mandal Sangatan Mantri

Uttar Railways Karmchari Union

283/63, Kh Gadi Kannora

PO Manak Nagar

Lucknow

(Espousing cause of Shri Bhai Lal)

AND

1.

Dy. Chief Engineer (Construction)

Uttar Railway, Charbagh

Lucknow.

2.

Deputy Chief Manager (Stores)

Northern Railway, Stores Depot

Alambagh, Lucknow.

¹Hkkx IIó[k.M 3(ii)º

Hkkjr dk jkti=k % vDrwcj 10] 2015@vkf'ou 18] 1937

4063

AWARD

1. By order No. L-41011/101/2009-IR (B-I) dated:

09.11.2010 the Central Government in the Ministry of

Labour, New Delhi in exercise of powers conferred by clause

(d) of sub-section (1) and sub-section (2A) of Section 10 of

the Industrial Disputes Act, 1947 (14 of 1947) referred this

industrial dispute between Mandal Sangatan Mantri, Uttar

Railways Employee Union, 283/63, Kh Gadi Kannora, PO.

Manak Nagar, Lucknow and the Dy. Chief Engineer

(Construction), Uttar Railway, Charbagh, Lucknow &

Deputy Chief Manager (Stores), Northern Railway, Stores

Depot, Alambagh, Lucknow to this CGIT-cum-Labour

Court, Lucknow for adjudication.

2. The reference under adjudication is:

"Whether the action of Management of North Central

Railway, Allahabad/Kanpur in not giving

Shri Bhai Lal, T.No. 56 status of Temporary worker

from the date of completion of 120 days of service is

legal and justified? To what relief the workman is

entitled?"

3. The case of the workman's union, in brief, is that the

workman, Bhai Lal, has been engaged as casual labour

with in contruction unit under opposite party No. 1 and is

presently working under opposite party No. 2. It has been

alleged by the workman's union that the workman under

dispute was to be given temporary status after completion

of 120 days of working as per P.S. No. 7850, Master Circular

48/92 and Rules 2304, 2501 and 2511 of Indian Railway

Establishment Manual; but they were granted temporary

status after five years' of their engagement, which is not

only unfair labour practice but also is against Article 21 of

the Constitution. Accordingly, the workman's union has

prayed that the workmen concerned be granted temporary

status from the date they have completed 120 days' working

with consequential benefits.

4. The management of the North Central Railways has

filed its written statement denying the allegations of the

workman's union with submission that the workman under

dispute was initially engaged by them as Project Casual

Labour in Construction Unit with intermittent gap w.e.f.

24.04.79 and has been granted temporary status on 01.01.85

vide letter No. 220-E/3/Recruit dated 22/25.02.85. It has been

submitted that the railway formulated a scheme to provide

the temporary status to Project Casual Labour, circulated

vide No. E(NG)II/84/CL/41 dated 1.6.84 as per directions of

Hon'ble Apex Court in Inder Pal Yadav & others vs. Union

of India & others (1985) 2 SCC 648. The management has

submitted that as per modified date of grant of temporary

status, the workmen were screened and posted as Gangman

and is in fruitful employment of the opposite party for last

20 years, thus, raising the present industrial disputes after

lapse of 20 long years makes it time barred hence, not

maintainable in the eye of law. It is specifically submitted

by the management that the workman has been engaged

as project casual labour and as per existing Railway Rules

360 days' continuous service is required for grant of

temporary status, therefore, the claim of the workmen for

grant of temporary status after 120 days is not maintainable

and liable to be rejected. Accordingly, the management has

prayed that the claim of the workman's union be rejected

being devoid of any merit.

5. The workman's union has filed its rejoinder wherein

apart from reiterating facts already mentioned in the

statement claim has submitted that the workman under

dispute has not been appointed in any project, therefore,

decision of Hon'ble Apex Court of Inder Pal Yadav case

(supra) is not applicable on him and he should be granted

temporary status after completion of 120 days of service.

6. The workman's union has not filed any documentary

evidence in support of its claim; rather it has stated that

the Casual Labour Card in respect of the workman and his

Service Book, is with the employers, in original.

The management has filed photocopy of Casual Labour

Card and Service Book in respect of workman.

7. The workman's union has examined workman; whereas

the management examined Sri Prabir Kumar Gupta, SPO/

Stores in support of their claim. The parties availed

opportunity to cross-examine the each other's witnesses

apart from putting oral arguments as well as written

arguments.

8. Heard learned authorized representatives of the parties

and perused entire evidence on record.

9. The authorized representative of the workman has

contended that the workman was not project casual labour;

rather he was casual labour engaged in construction

division/unit. Therefore, he was eligible for grant of

temporary status from the date he completed 120 days of

service. The railway administration instead treated him as

project casual labour and granted him temporary status

after lapse of five years which is unfair labour practice. It is

also contended that the decisions of the Hon'ble Supreme

Court in Indra Pal Yadav case (supra) is not applicable on

the workman. The workman's union has relied on:

(i) Union of India vs. Presiding Officer, CGIT-cum-

Labour Court, Kanpur Nagar & another 2008(116)

FLR 1046.

(ii) Union of India & others vs. Basant Lal & others

1992 SCC (L&S) 611.

(iii) L. Robert D'Souza vs. Executive Engineer, Southern

Railway & another 1982 SCC (L&S) 124.

(iv) N. Balakrishnan vs. M. Krishnamurthy ACJ 1998

1347 SC.

4064

THE GAZETTE OF INDIA : OCTOBER 10, 2015/ASVINA 18, 1937

[PART II—SEC. 3(ii)]

(v) Kuldeep Singh vs. GM, Instrument Design

Development and Facilities Centre & another 2011

(128) FLR 121.

(vi) Din Mohammed (Dead) by LRS vs. Union of India

& others 2002 (92) FLR 1216.

(vii) The Union of India & another vs. Girja Shankar &

others 2003 (96) FLR 1094.

10. In rebuttal, the authorized representative of the

management has contended that the workman has been

project casual labour in construction unit and worked with

intermittent gap and he was granted temporary status as

per Railway Board's letter dated 01.06.84. It has been

submitted that the Railway Board vide its letter dated

11.09.86 modified the date of temporary status to the

workmen in view of decision given by Hon'ble Supreme

Court in Indra Pal Yadav case (supra). The management

has contended that the workman was not entitled for grant

of temporary status after completion of 120 days

continuous service since he was engaged as project casual

labour and as per existing Railway Rules, 360 days'

continuous services is required for grant of temporary status

to a project casual labour. The authorized representative of

the management has also contended that the workman has

turned up after lapse of more than 20 years and his cause is

not tenable in the eye of law being time barred. The

amangement has relied on Inder Pal Yadav & others vs.

Union of India (1985) 2 SCC 648.

11. I have given my thoughtful consideration to the

rival submissions of the learned authorized representatives

of the parties and scanned entire evidence on record in

light thereto.

12. The workman has come up with a case that he has

been engaged as casual labour in the Construction Unit of

the Dy. Chief Engineer (Construction), Northern Railway,

Lucknow and he was entitled for grant of temporary status

on completion of 120 days of service under P.S.N. 7850,

Master Circular 48/92 and Rules 2304, 2501 and 2511 of

Indian Railway Establishment Manual; but the management

granted him temporary status after five years' of their

appointment, amounting to unfair labour practice. The

workman's union has not filed any documentary evidence

in support of their case; rather it has pleaded that the same

is in power and possession of the Railways.

13. The management of the Northern Railways, rebutting

the claim of the workman's union has come up with a clear

cut case that the workman had been engaged as Project

Casual Labour and accordingly, he was entitled for grant

of temporary status on completion of 360 days continuous

service; and accordingly, he was grated vide Railway

Board's letter dated 01.06.84. Later on with decision of

Hon'ble Apex Court in Inder Pal Yadav case (supra), the

date of grant of temporary status was modified vide Railway

Board's letter dated 11.09.86 whereby the workmen were

given temporary status from previous date. The

management has also stressed upon the facutm of delay in

raising the present industrial dispute after lapse of more

than 20 years. The authorized representative of the

management has pointed out that the workman is working

with the railways for decades; but neither he preferred any

representation, on the issue; nor moved to the court for

redressal of his grievances. It is also stressed by the

management that the workman has raised the present

industrial dispute at a highly belated stage without any

explanation to the delay. It has also been argued that though

there is no limitation in the I.D. Act, 1947; but the same

should not be condoned for the want of any explanation

from the workman's union. He has also submitted that the

Hon'ble Apex Court in number of its verdicts has observed

that Courts should exercise their discretion, judiciously,

while condoning the delay.

14. The workman's union has adduced evidence of the

workman who stated in his cross-examination that he had

been appointed as casual labour on 17.08.79 and he was

granted temporary status w.e.f. 1.1.83. The workman

admitted the photocopy of service record and casual labour

card, filed by the management, from paper No. M-8/1

to 8/12.

15. The workman has not filed any documentary proof

in support of their claim but has relied on the photocopy of

the service record and casual labour card of the workman,

filed by the management. The service record of the workman

shows the entry regarding grant of temporary status to the

workman of different dates and there after grant of revised

temporary status from different dates as per Railway Board's

circular dated 11.9.86. The photocopy of the casual labour

card, filed by the management has details regarding working

of the workman with Permanent Way Inspector

(Construction) at different-different stations.

Thus, both the parties have relied on the same set of

documents in support of their different stands.

16. After going through the rival pleadings of the parties

and documentary and oral evidence relied upon by the

parties the bone of contention is as to whether the workman

was project casual labour or just casual labour engaged in

the railway administration. Had they been Project Casual

Labour then the action of the management was right and if

they were casual labour on the rolls of railways then they

ought to have been granted temporary status on

completion of 120 days continuous service.

The burden that lied upon the workman's union was to

come with the evidence that the workman was engaged as

Casual labour and he completed 120 days continuous

service on this particular date, making him entitled for grant

of temporary status. Thus, it was for the workman's union

to lead its evidence on two points firstly that the workman

was engaged as casual Labour and secondly that he

¹Hkkx IIó[k.M 3(ii)º

Hkkjr dk jkti=k % vDrwcj 10] 2015@vkf'ou 18] 1937

4065

completed 120 day's of continuous working on such and

such date. But the workman failed to comply with the above

requirement. As it relied on the documentary evidence i.e.

casual labour card which was in power and possession of

the management for working detail; but when the

management field the photocopy of the same then it neither

calculated the 120 days' continuous working from it nor

disputed its genuineness. This goes to upheld the stand

taken by the management that the workman was project

Casual Labour and accordingly he was granted temporary

status on completion of 360 days' of continuous working

vide Railway Board's letter dated 01.06.84 and thereafter

granted them revised temporary status from a back date

vide letter dated 11.09.86 as per guidelines of Hon'ble Apex

Court.

17. The workman has relied on Union of India vs.

Presiding Officer, CGIT-cum-Labour Court, Kanpur Nagar

& another which pertains to termination of services of a

workman in violation of provisions of Section 25F, G & H

of the Act. However, the facts of the present case are entirely

different; hence not applicable in the present case. The

workman has also relied on Unoin of India & others vs.

Basant Lal & others 1992 SCC (L&S) 611; wherein the

Hon'ble Apex Court has held that a workman having

completed 120 days of working becomes entitled for

regularization as temporary works and the Railway cannot

deny them the temporary status on the ground that they

had been appointed as casual labour on a project work and

not on construction work on open line and as such they

would acquire the temporary status only after completing

360 days of service. But in the present case the workman's

union failed to specify the date when the different workem

completed 120 days' of continous service, rendering them

for grant of temporary status. The workman's union has

also relied on L. Robert D'Souza vs Executive Engineer,

Southern Railway & another 1982 SCC (L&S) 124 but the

fact of the case law is entirely different from the present

case hence not applicable. Likewise the facts of the case

law relied upon by the workman in the Union of India &

another vs. Girja Shankar & others 2003 (96) FLR 1094,

Kuldeep Singh vs. GM Instrument Design Development

and Facilities Centre & another 2011 (128) FLR 123 and Din

Mhammaed (Dead) By LRs. vs. Union Of India & others

2002 (992) FLR 1216 are quite different from the facts of the

present case hence not appreciable.

18. It is well settled that if a party challenges the legality

of an action, the burden lies upon him to prove illegality of

the action; and if no evidence is produced, the party

invoking jurisdiction of the court must fail. In the present

case burden was on the workman's union to set out the

grounds to challenge the validity of the action of the

management in not granting the temporary status to the

workman after completion of 120 days of continuous

working. For this the burden of proof was on the workman's

union to come with the evidence, that the workman under

dispute has been engaged by the management of Railways

as casual labour and under Rules they were entitled for

grant of temporary status from competion of 120 days

services with the employers; but the workman's union has

failed to discharge the burden that lied upon them. The

workman's union made a pleading, to explain the reason

why it is not in position to file any documentry evidence

before this Tribunal, in their statement of claim to the effect

that the relevant document in support of their claim i.e.

Casual Labour Card is attached in their Service book. The

workman's union in its rejoinder required the management

to produce Casual Labour Card in respect of the workman

before this Tribunal, resultantly, the management filed

photocopy of Casual Labour Card and Services Book in

respect of the workman. The workman's union did not

dispute the service details filed by the management i.e.

Casual Labour Card and extracts of Service Book. Therefore,

when the management has field the photocopy of Casual

Labour Card as desired by the workman's union then it was

incumbent upon the workman's union to come forward and

sort out the relevant extract of the Casual Labour Card,

which bears working details i.e. working period and number

of days, to show that the workman completed 120 days of

continuous on such and such date and he was entitled for

grant of temporary status from such date. But the workman

has utterly failed to bring any evidence to the effect before

this Tribunal that the workman was engaged as Causal

Labour and that the workman was casual labour and it also

failed to specify the date as to when the workman completed

120 days' of continuous working, making him eligible for

grant of temporary status.

19. On the contrary the management has come with a

clear cut case that the workman was engaged as Project

Casual Labour with Construction Unit. It is also contended

by the learned authorized representative of opposite party

that there are so many projects which go on with the

Construction Unit and the workmen were kept engaged in

different Projects. it is also specifically pleaded and proved

by the management that the workman was granted

temporary status vide Railway Board's letter dated 01.06.84;

but due to Supreme Court's direction in Indra Pal Yadav

Case (supra), the Railway Board vide its letter dated 11.09.86,

changed the date of grant of temporary status, as per

modified policy and accordingly, reduced the date of

Temporary Status through notice. The management has

filed photocopy of Service Record in respect of workman,

which bears entries regarding grant of temporary status to

the workman.

20. The management has made a specific pleading to

the effect that the claim of the workman's union is stale one

and time barred as the union has preferred the case before

this Tribunal after sapse of more than 20 years. The

workman's union in rebuttal has submitted that there is no

provision regarding limitation in the Industrial Disputes

Act, 1947; hence their claim is maintainable.

4066

THE GAZETTE OF INDIA : OCTOBER 10, 2015/ASVINA 18, 1937

[PART II—SEC. 3(ii)]

In this regard the workman's union has relied on N.

Balakrishnan vs M. Krishnamurthy 1998 ACJ 1347; wherein

Hon'ble Apex Court while dealing with the matter delay has

observed that length of delay does not matter, acceptability

of the explanation is the only criterion. But the workman's

union has not given any explanation in its pleadings as to

what prevented them to raise an industrial dispute at an

early state. However, in the evidence it has been stated

that the workman/union wrote many letters to the opposite

parties and the same are pending with them; although no

copy of such letter/representation finds its reference either

on record or annexure with the affidavit. Moreover, the

management witness vide para 9 of his affidavit has denied

of submissions of any such application by the workman.

In Chennai Metropolitan Water Supply and Sewerage

Board & others vs T.T. Murali Babu 2014 (141) FLR 772,

Honble Apex Court has observed as under:

"The Court should bear in mind that it is exercising

an extraordinary and equitable jurisdiction. As a

Constitutional Court it has a duty to protect the right

of the citizens but simultaneously it is to keep itself

alive to the primary principle that when an aggrieved

person, without adequate reason, approaches the

Court at his own leisure or pleasure, the Court would

be under legal obligation to scrutinize whether the

lis at a belated stage should be entertained or not. Be

it noted, delay comes in the way of equity. In certain

circumstances delay and laches may be fatal but in

most circumstances inordinate delay would only

invite disaster for the litigant who knocks at the doors

of the Court. Delay reflects inactivity and inaction

on the part of a litigant-a litigant who has forgotten

the basic norms, namely "procrastination is the

greatest thief of thim" and second, law does not

permit one to sleep and rise like a phoenix. Delay

does bring a hazard and causes injury to the lis. In

the case at hand, though there has been four years'

delay in approaching the Court, yet the writ Court

Chose not to address the same. It is the duty of the

Court to scrutinize whether such enormous delay is

to be ignored without any justification."

Further, in Dr. Jawahar Lal Rohatgi Memorial Eye Hospital

vs State of U.P. & Others 2013 (138) FLR 11 Hon'ble Allahabad

High Court upholding the action of the State Government in

denying the making reference of case after 22 years held that

it is not expedient for State government to refer against order

of termination dated 26.6.1982 being old and state case, where

the workman filed an application raising industrial dispute

after 22 years in 2004. Hon'ble High Court observed that

there is nothing to indicate as to why the workman could not

approach the authority under the ID Act.

Thus, from the face of record it is crystal clear the

workman did not bother to approach the management or

any legal forum for redressal of his grievances for more

than 20 years; and the explanation forwarded by the

workman's union before this Tribunal is insufficient.

21. Hence, from the facts and circumstances of the case

and law cited hereinabove; I am of considered opinion that

the action of the management of Northern Railway, Lucknow

in not giving temporary status to the workman, Shri Bhai

Lal, from the alleged date oc completion of 120 days of

service is neither illegal nor unjustified. Accordingly, I come

to the conclusion that the workman's union is not entitled

to any relief.

22, The reference under adjudication is answered

accordingly.

23. Award as above.

LUCKNOW

16th September, 2015

RAKESH KUMAR, Presiding Officer

ubZ fnYyh] 5 vDrwcj] 2015

dk-vk- 1972-—vkS|ksfxd fookn vf/kfu;e] 1947 ¼1947

dk 14½ dh /kkjk 17 ds vuqlj.k esa] dsUnzh; ljdkj fVLdks ds

izca/kra= ds lac) fu;kstdksa vkSj muds deZdkjksa ds chp] vuqca/k esa

fufnZ"V vkS|ksfxd fookn esa dsUnzh; ljdkj vkS|ksfxd vf/kdj.k@Je

U;k;ky; uñ 1] /kuckn ds iapkV ¼lanHkZ la[;k 14@2003½ dks izdkf'kr

djrh gS] tks dsUnzh; ljdkj dks 05@10@2015 dks izkIr gqvk FkkA

[lañ ,y&20012@217@2002&vkbZvkj ¼lh&I½]

,eñ dsñ flag] vuqHkkx vf/kdkjh

New Delhi, the 5th October, 2015

S.O. 1972.—In pursuance of Section 17 of the Industrial

Disputes Act, 1947 (14 of 1947), the Central Government

hereby publishes the Award (Ref. No. 14/2003) of the Cent.

Govt. Indus. Tribunal-cum-Labour Court No. 1, Dhanbad

as shown in the Annexure, in the industrial dispute between

the management of M/s. TISCO and their workmen, received

by the Central Government on 05/10/2015.

[No. L-20012/217/2002-IR(C-I)]

M. K. SINGH, Section Officer

ANNEXURE

BEFORE THE CENTRAL GOVERNMENT

INDUSTRIAL TRIBUNAL (NO. 1) DHANBAD

In the matter of reference U/S 10(1) (d) (2A) of

I.D. Act, 1947

Ref. No. 14 of 2003

Employer in relation to the management of TISCO

AND

Their workmen

¹Hkkx IIó[k.M 3(ii)º

Hkkjr dk jkti=k % vDrwcj 10] 2015@vkf'ou 18] 1937

4067

Present:

Shri Ranjan Kumar Saran, Presiding Officer.

Appearances:

For the Employers : Shri D.K. Verma, Advocate

For the workman

: None

State : Jharkhand

Industry : Coal.

Dated 15/9/2015

AWARD

By Order No. L-20012/217/2002-IR (C-I), dated. 24/01/

2003, the Central Government in the Ministry of Labour

has, in exercise of the powers conferred by clause (d) of

sub-section (1) and sub-section (2A) of Section 10 of the

Industrial Disputes Act, 1947, referred the following

disputes for adjudication to this Tribunal:

SCHEDULE

"Whether the demand of the RCMS from

management of TISCO for providing employment to

the dependent son of Shri Hiroo Gorai the workman

discharged from service on medical ground is

justified? If so, to what relief the workmen or his

dependent entitled?"

2. After receipt of the reference the parties are noticed.

Though they took steps for certain dates, subsequently

did not take any interest in the case. It is presumed that the

disputes between parties have been resolved in the

meantime. Hence No Dispute Award is passed.

R.K. SARAN, Presiding Officer

ubZ fnYyh] 5 vDrwcj] 2015

dk-vk- 1973-—vkS|ksfxd fookn vf/kfu;e] 1947 ¼1947 dk

14½ dh /kkjk 17 ds vuqlj.k esa] dsUnzh; ljdkj chlhlh,y ds

izcaèra= ds lac) fu;kstdksa vkSj muds deZdkjksa ds chp] vuqca/k esa

fufnZ"V vkS|ksfxd fookn esa dsUnzh; ljdkj vkS|ksfxd vf/kdj.k@Je

U;k;ky; uñ 2] /kuckn ds iapkV ¼lanHkZ la[;k 36@2013½ dks izdkf'kr

djrh gS] tks dsUnzh; ljdkj dks 05@10@2015 dks izkIr gqvk FkkA

[lañ ,y&20012@130@2012&vkbZvkj ¼lh,e&I½]

,eñ dsñ flag] vuqHkkx vf/kdkjh

New Delhi, the 5th October, 2015

S.O. 1973.—In pursuance of Section 17 of the Industrial

Disputes Act, 1947 (14 of 1947), the Central Government

hereby publishes the Award (Ref. No. 36/2013) of the Cent.

Govt. Indus. Tribunal-cum-Labour Court No. 2, Dhanbad

as shown in the Annexure, in the industrial dispute between

the management of M/s. BCCL and their workmen, received

by the Central Government on 05/10/2015.

[No. L-20012/130/2012-IR(CM-I)]

M. K. SINGH, Section Officer

ANNEXURE

BEFORE THE CENTRAL GOVERNMENT

INDUSTRIAL TRIBUNAL (NO. 2), AT DHANBAD

PRESENT :

Shri Kishori Ram, Presiding Officer

In the matter of an Industrial Dispute under Section

10(1)(d) of the I.D.Act., 1947.

REFERENCE NO. 36 OF 2013

PARTIES

:

The Secretary,

Jharkhand Janta Mazdoor Union,

Vishwakarma Colony, Nutandih,

PO; Jagjivan Nagar, Dhanbad.

Vs.

The General Manager,

Kusunda Area of M/s BCCL,

PO; Kusunda, Dhanbad.

Order No. L-20012/130/2012-IR(CM-I)

dt. 08.02.2013

APPEARANCES:

On behalf of the workman/Union :

Mr. Pintu Mandal,

Ld.Rep

On behalf of the Management

:

Mr. U.N. Lal, Ld.Adv.

State : Jharkhand

Industry: Coal

Dated, Dhanbad, the 1st Sept., 2015

AWARD

The Government of India, Ministry of Labour, in exercise

of the powers conferred on them under Sec. 10(1)(d) of the

I.D. Act, 1947 has referred the following dispute to this

Tribunal for adjudication vide their Order No. L-20012/130/

2012-IR (CM-I) dt. 08.02.2013.

SCHEDULE

"Whether the action of the Management of Gondudih

Khas Kusunda Colliery of M/s BCCL in dismissing

Shri Ashok Kr. Rajak, Ex. M/Loader from the services

of the Company vide letter dated 16/17.09.1997 is fair

and justified? To what relief is the concerned

workman entitled to?"

On receipt of the Order No. L-20012/130/2012-IR(CM-I)

dt 08.02.2013 of the above mentioned reference from the

Government of India, Ministry of Labour and Employment,

New Delhi for adjudication of the dispute, the Reference

Case No. 36 of 2013 was registered on 01.03.2013, and

accordingly an order to that effect was passed to issue

notice through the Registered Posts to the parties

concerned, directing them to appear in the Court on the

date fixed, and to file their written statements along with

4068

THE GAZETTE OF INDIA : OCTOBER 10, 2015/ASVINA 18, 1937

[PART II—SEC. 3(ii)]

the relevant documents. In pursuance of the said order,

notices by the Registered Posts were sent to the parties

concerned.

Both the parties made their appearances and filed their

pleadings and photocopies of their documents. The Union/

Petitioner and the O.P./Management through their own Ld.

Union Representative and Counsel respectively appeared.

2. The case of the workman Ashok Kumar Rajak as

represented by the Sponsoring Jharkhand Janta Mazdoor

Union in his written statement is that the workman was a

permanent employee of M/s BCCL who was posted as

M/Loader at Khas Kusunda Colliery, Kusunda area. He

was issued the chagesheet vide No. KK/97/2000 dt.

05/07.02.1997 for his unauthorized absentism. It was issued

to deal with the absence for minor punishment, so he was

given 48 hours time to reply to the chargesheet. The

contention of the workman was never considered either by

the Enquiry Officer or by the Disciplinary Authority. He

was ultimately dismissed from the service of the Company

as per order No. 1775 dt. 16/17.02.1997. But the Disciplinary

Authority did not issue him any show Cause Notice for his

defence properly, so it was a gross illegality on the part of

the employer. Thereafter, the workman appealed before the

Appellate Authority on 17.10.1997 against the dismissal

order. But the Appellate Authority did not dispose of the

appeal in accordance with the provision the Certified

Standing Order of the Company. Non disposal of the appeal

the Appellate Authority is violation of the provisions of

the Certified Standing Orders, which are the laws. It appears

from the above facts that at every step, the principles of

the law have been violated. The workman belongs to S/C

Community. The punishment of dismissal imposed on the

workman is not in proportionate to his alleged misconduct

of absentism. Under such circumstances; the action of the

Management in dismissing Shri Rajak was not unjustified.

The workman in his rejoinder filed on the behalf of the

Secretary of the Union has specifically denied all the

allegations of the O.P./Management, further alleging that

the charge as levelled was not established nor any

documentary proof was brought in course of the enquiry,

nor any 2nd Show Cause Notice was served upon him, so

it amounts to denial of natural justice.

3. Whereas the counter statement of behalf of the O.P./

Management is that the workman Ashok Kumar Rajak, the

Ex.-M/Loader had absented unauthorizedly from 29.4.1996

to 04.02.1997, so he was issued the charge sheet dt.

5/7.2.1997 for his unauthorized absentism under 26.1.1 of

the Certified Standing Orders. The workman had submitted

his reply to the charge sheet, but it was not satisfactory.

Hence the Disciplinary Authority decided for the Enquiry

into it by appointing Shri B. Pandey, Dy P.M., Kusunda

Colliery and Shri N.N. Adkhikary as the Enquiry Officer

and the Management Representative, respectively as per

the letter No. 291 dt.24/25.2.1997 which was duly received

by the workman.

On the notice of the enquiry, the workman fully

participated in it. He was given full opportunity for his

defence. The enquiry was held according to the principles

of natural justice. The enquiry Officer submitted his enquiry

report, holding the charge of habitual absentism as fully

established against the workman. On application of his

mind and consideration of the workman's past three years'

attendances, viz, 34, 92 and 90 days in the year 1996 to 94

respectively, the Disciplinary Authority had finally decided

to impose upon the workman the penalty of dismissal from

services, endorsing to the Chief General Manager. The

workman was served with the 2nd Show Cause Notice as

per the Letter No. 1375 dt. 23/25.8.1997. The reply of the

workman to it was also found unsatisfactory. The

Management dismissed the workman from the serviced of

the Company as per the Office Order No. 1775 dt. 16/

17.09.1997, directing him to vacate the Company's quarter

and to get his dues from the office. It is evident from the

above facts that the action of the Management in dismissing

the workman from the service of the Company was quite

just and justified for his absentism. So the workman is not

entitled to any relief.

The O.P./Management in its simultaneous rejoinder has

categorically denied the allegations of the workman as

incorrect, further submitting to provide a chance to produce

afresh evidence to prove the charge against the workman,

if the enquiry is found unsatisfactory.

FINDINGS WITH REASONS

4. In the instant case, at the preliminary point over the

fairness of the domestic enquiry, the Union Representative

for the workman by filing a petition on 20.08.2014, accepted

the enquiry fair and proper, so the Tribunal as per the order

No. 11 dt. 20.8.2014 held not other-wise except fair. The

copies of the documents of both the parties on their

consensus were marked for proper appreciation of fact in

issue.

Mr. Pintu Mandal, the Union Representative for the

workman, has submitted that in this case according to the

charge sheet (Ext.1), the workman concerned had absented

from his duty w.e.f. 29.04.1996, but in fact he got absent

from his duty due to sickness of his father under his look

after under intimation to the Management. Since the

chargesheet does not reveal the precise nature of any

misconduct, it is not legally sustainable. Moreover, the

Manager had granted 48 hours time in the charge sheet to

the workman for his reply. It clearly meant for initiation of

the disciplinary proceeding for minor punishment, but the

Manager of the Khas Kusunda Colliery passed the order

of dismissed towards the workman which is not justified,

and even 2nd Show Cause notice was also not issued;

¹Hkkx IIó[k.M 3(ii)º

Hkkjr dk jkti=k % vDrwcj 10] 2015@vkf'ou 18] 1937

4069

thus it has been urged on behalf of the workman that in

such circumstances the workman is entitled to his

reinstatement with full back wages and consequential

benefits.

5. Just contrary to it, Mr. U.N. Lal, Ld. Counsel for the

OP/Management contends that the workman was a habitual

absentee from 29.04.1998 just as his past three years record

of service; on the 2nd Show Cause Notice as per the

Management's letter No. 1375 dt. 23/25 August, 1997, to

which the workman has given his reply, but after finding it

unsatisfactory, the Disciplinary Authority as per the letter

dt. 16/17.09.1997 imposed upon him the punishment of

dismissal (Ext. M.10) Which is just and justified; therefore

the workman is not entitled to any relief.

6. On the perusal and consideration of the materials as

produced on behalf of both the parties, I find the facts as

under:

(i) The reply of the charge-sheeted workman

dt.6.2.1997 as also stated before the Enquiry Office

clearly all along displayed the fact he was so

inxtricablely involved or engaged in the look after

and medication for his over-sick father that he

got unable to attend to his duty at the relevant

time.

(ii) The secondly, the past three years record of the

Service Records of the workman apears to be

unaccounted in course of the enquiry.

(iii) Thirdly, there is no proof of the 2nd Show Cause

to the workman prior to his dismissal, or his reply

to it, and

(iv) Fourthly, the punishment of his dismissal for his

misconduct of absentism for the relevant period

appears to be not only harsh but also

disproportionate to the nature of his misconduct

under clause 26.1.1 of the Certified Standing Order

of the Company. So the dismissal of the workman

is liable to be set aside under Sec. 11 A of the

Industrial Disputes Act, 1947.

In view of the aforesaid findings, it is, in the terms of the

Reference, hereby responded and accordingly awarded that

the action of the Management of Gondudih Khas Kusunda

Colliery of M/s BCCL in dismissing Shri Ashok Kr. Rajak,

Ex. M/Loader from the services of the Company as per the

letter dt. 16./17.09.1997 is quite unfair and unjustified.

Therefore, the workman concerned is entitled to his

reinstatement in the service of the Company without back

wages for the relevant period.

Hence the OP/Management is directed to implement

the Award within a month from the date of its receipt after

the publication of it by Government of India in the Gazette.

KISHORI RAM, Presiding Officer

ubZ fnYyh] 5 vDrwcj] 2015

dk-vk- 1974-—vkS|ksfxd fookn vfèfu;e] 1947 ¼1947

dk 14½ dh èkjk 17 ds vuqlj.k esa] dsUnzh; ljdkj lhlh,y ds

izcaèra= ds lac) fu;kstdksa vkSj muds deZdkjksa ds chp vuqcaè esa

fufnZ"V vkS|ksfxd fookn esa dsUnzh; ljdkj vkS|ksfxd vfèdj.k@Je

U;k;ky; uañ 2] èuckn ds iapkV ¼lanHkZ la[;k 57@2007½ dks

izdkf'kr djrh gS] tks dsUnzh; ljdkj dks 05@10@2015 dks izkIr gqvk

FkkA

[lañ ,y&20012@80@2007&vkbZvkj ¼lh,e&I½]

,eñ dsñ flag] vuqHkkx vf/kdkjh

New Delhi, the 5th October, 2015

S.O. 1974.—In pursuance of Section 17 of the Industrial

Disputes Act, 1947 (14 of 1947), the Central Government

hereby publishes the Award (Ref. No. 57/2007) of the Cent.

Govt. Indus. Tribunal-cum-Labour Court No. 2, Dhanbad

as shown in the Annexure, in the industrial dispute between

the management of M/s. CCL and their workmen, received

by the Central Government on 05/10/2015.

[No. L-20012/80/2007-IR(CM-I)]

M. K. SINGH, Section Officer

ANNEXURE

BEFORE THE CENTRAL GOVERNMENT

INDUSTRIAL TRIBUNAL (No. 2) AT DHANBAD

PRESENT :

Shri Kishori Ram, Presiding Officer

In the matter of an Industrial Dispute under Section

10(1)(d) of the I.D. Act, 1947.

REFERENCE NO. 57 OF 2007

PARTIES

:

Shri Bhola Sao,

S/o Late Kolha Sao,

Vill: Central Saunda 7 No. Barrack,

PO: Saunda, Hazaribagh.

Vs.

The Project Officer,

Central Saund Colliery of M/s CCL,

Post Saunda, Hazaribagh.

APPEARANCES:

On behalf of the workman/Union :

Mr. S. N. Goswami,

Ld. Advocate

On behalf of the Management

:

Mr. D. K. Verma,

Ld. Advocate

State : Jharkhand

Industry : Coal

Dated, Dhanbad, the 10th Sept., 2015

4070

THE GAZETTE OF INDIA : OCTOBER 10, 2015/ASVINA 18, 1937

[PART II—SEC. 3(ii)]

AWARD

"The Government of India, Ministry of Labour, in exercise

of the powers coferred on them under Sec. 10(1)(d) of the

I.D. Act, 1947 has referred the following dispute to this

Tribunal for adjudication vide their Order No. L-20012/80/

2007-IR(CM-I) dt. 31.08.2007/ 07.09.2007.

SCHEDULE

"Whether the action of the management of Central

Saunda Colliery of M/s CCL in dismissing the

services of Shri Bhola Sao, Loader, w.e.f. 24.04.2004

is justified and legal? If not, to what relief is the

concerned workman is entitled?"

On receipt of the Order No. L-20012/80/2007-IR(CM-I)

dt. 31.08.2007/ 07.09.2007 the above mentioned reference

from the Government of India, Ministry of Labour and

Employment, New Delhi for adjudication of the dispute,

the Reference Case No. 57 of 2007 was registered on

18.09.2007 and accordingly an order to that effect was

passed to issue notices through the Registered Posts to

the concerned, directing them to appear in the Court on the

date fixed, and to file their written statements along with

the relevant documents. In pursuance of the said order,

notices by the Registered Posts were sent to the parties

concerned.

Both the parties made their appearances and filed their

pleadings and photocopies of their documents. The Union

and the O.P./Management through their Ld. Counsels,

respective, appeared in, and contested the case.

2. The case of workman Bhola Sao as represented in his

claim statement is that he is a bona fide worker, as he was

employed as Miner/Loader as proved from his Identity

Card which was issued by the Management of the Central

Saunda Colliery of M/s C.C.L., His photograph along with

his personal particulars has been certified by the Competent

Officer of the Company. He has also submitted his sworn

affidavit from the court of the Magistrate. It has proved his

genuineness, as he has been issued the Identity Card by

the Election Commissioner, as the son of Late Kolh Sao as

certified by him. The office of the Dy. Commissioner,

Hazaribagh as per his reference no. 1100472 has certified

his family details, the names of his family members for the

issuance of his Ration Card. All the documents prove him

a genuine worker of the Central Saunda Colliery of M/s.

CCL. He was not impersonating anybody. Further alleged

that workman Bhola Sao, son of Kolha Sao was also issued

by the Management the Service Excerpt in 1987 containing

all his family details who are supposed to be based on the

details entered into the Form B of the Colliery maintained

under the Mines Act, 1952 and its Rule. He had also

objected to his date of birth 01.05.1944 having been

recorded in place of the year 1954 in his service Excerpt. He

had been working in the said colliery since 26.5.73. But he

was suddenly issued the charge sheet by the Management

on 29.08.2001 that he was factually Gultu Sao by name, but

he had been impersonating the real workman named Bhola

Sao who had died in the year 1995.

3. Further alleged by the workman is that the entire

enquiry was concocted which was not properly but in

volition of the principle of natural justice conducted in

English, not in Hindi version. It is remarkable to note the

neither Management lodged an FIR for the cheating by

personation which is a criminal offence u/s 416 of the Indian

Penal Code nor any punishment was awarded to Shri Bhola

Sao by the Criminal Court. Though the Management

Reprsentative produced a Death Certificate issued by a

local body in the enquiry, neither cause of death nor any

document to that effect produced in the enquiry in respect

of the person being impersonated. The other Bhola Sao,

who later on died in the year 1995, had never complained.

Moreover, in respect of the impersonation of any other

Bhola Sao by the workman, the officials of the Management -

the Attendance Clerk, the Mining Sardar or the Overman -

did not report of it to the Personnel Officer, the Asst.

Manager or to the Project Officer of the colliery during the

life time of the other person. None appeared on behalf of

the impersonatee to prove his impersonation against the

workman. The charge as established in the faulty enquiry

in incorrect; rather it is malafide intention. So the

punishment of dismissal as awarded by the Management

is baseless and unjustified; the workman Bhola Sao is,

therefore entitled to reinstatement with full back wages

and all consequential benefit.

4. The workman petitioner in his rejoinder has specifically

denied the allegations of the O.P./Management,

emphasizing no misconducts under clauses 26.1, 26.9, 26.13

and 26.22 of the Certified Standing Orders of the Company.

The principles of natural justice were ignored in the enquiry.

5. Whereas challenging the maintainability of the

Industrial Dispute in law and on facts, the contra case of

the OP/Management is that since the workman had

committed the misconducts under the provisions of the

Certified Standing Orders of the Company, he was issued

the charge sheet cum suspension letter No. PO/CS/01/2132

dt. 23/29.08.2001 for impersonation as under:

"Your elder brother Bhola Sao was offered

employment at Toppa Project, CCL. Kuju Area in the

year 1973 vide letter No. CWB/Assess-Man Power/

73/3894-99 dated 25/26.5.1973 and later on he was

transferred to Barkakana Area vide order dated

23.12.1975. In conspiracy with your said elder brother

Shri Bhola Sao, you fraudulently entered into the

employment of CCL in place of him as an impersonator

during the year 1976 and you have since been

impersonating and working as Bhola Sao in CCL even

after his death on 30.12.1995.

¹Hkkx IIó[k.M 3(ii)º

Hkkjr dk jkti=k % vDrwcj 10] 2015@vkf'ou 18] 1937

4071

During the period of employment in CCL under the

identify of you elder Brother, you further played fraud

and cheating on the Company. First of all tempted by

your apparent younger look and more sound health

(as against your brother who was nearly 10 years

older and very weak), you attempted to gain an

employment in terms of No. of years by disputing

the recorded age of Bhola Saw in service records

through service sheet excerpts. Thereafter, in

connivance with the officials of CCL you managed

substitution of the name of your wife and children in

statutory and other official records in place of your

brother's. Though the original worker Bhola Saw had

nominated his wife Sonia Devi for the purpose of

statutory payments as per Form-declaration (under

CMPF) executed by him on 1-5-1974 but you

substituted the above nomination by nominating

Makri Devi, your wife through statutory form PS-4

executed on 27.05.1998. Similarly through statutory

form PS-3, you also declared Meghan Saw and others

as children of Bhola Saw whereas in reality Shri

Doman Saw, Mahabir Saw and Bodhan Saw are sons

of Bhola Saw is his nephew, and son of his younger

brother, that is your son. You further attempted to

mislead management through a wrong statement on

4-5-2000 recorded by the investigating officer

appointed by the Area Authority about the identity

of Bhola Saw and his family member. Even in voter's

list of Central Sounda, you got fraudulently declared

yourself as Bhola Saw, Makri Devi as W/o Bhola Sao

and Meghan Saw as son of Bhola Saw.

Being an impersonator, you have been also

fraudulently drawing salary wages and other fringe

benefits like medical, LTC/LLTC etc. even since 1976,

and thus you have caused huge financial loss to the

Company.

Your above illegal acts if proved would constitute

serious misconducts within the meaning of SO. Nos.

26.1, 26.9, 26.13 and 26.22 of the Certified Standing

Orders of CCL by which your services are governed

in the Company. The said four SO Nos. read as under:

"26.1 :Theft, fraud or dishonesty in connection with

the employer's business or property.

26.9 : Giving false information regarding one's name,

age, father's name, qualification etc. in connection

with his employment.

26.13 : Tempering with company's records with

ulterior motive.

26.22 : Any willful and deliberate act which is

subversive of discipline or which may be detrimental

to the interest of the company".

Further stated by the O.P./Management is that the

workman concerned had submitted his reply dt. 27.09.2001.

Being dissatisfied with it, the Authority concerned as per

the Office Order No. CS/PO/Enquiry/03/160 dt. 20/

21.01.2003 directed for a detailed enquiry into it, appointing

Shri Deepak Kumar, Personnel Manager (EE), CCL, Ranchi,

and Shri B.N. Dutta, Dy. FM(Vig), CCL as the Enquiry Officer

and the Management Representative respectively. After

holding the domestic enquiry in accordance with the

principle of natural justice in presence of the workman

concerned, the Enquiry Officer submitted his enquiry report,

holding the charges as levelled as proved against the

workmen. The workman was furnished with a copy of the

Enquiry Report with the copies of all proceedings as well

as with the 2nd Show Cause Notice as per the letter No.

CS/PO/SC/04/1043 dt. 08.04.2004. On consideration of all

the materials and gravity of the charges, the Management

as per the approval of the Competent Authority dismissed

the workman from the services of the CCL. w.e.f. 24.04.2004,

as not any extenuating circumstances existed to think

otherwise. The dismissal of the workman is legal and justified.

However, the O.P./Management had sought for permission

to afresh prove the charges, in case the domestic enquiry

held as unfair. The workman is not entitled to any relief.

6. The O.P./Management in its simultaneous rejoinder

has categorically denied all the allegations of the workman

concerned as incorrect and irrelevant, further stating the

charges levelled against the workman having been entered

into the employment of the company fraudulently by

impersonating himself as Bhola Saw whereas he was not

the actual Bhola Saw were duly proved. Thus the action of

the Management is alleged as legal and justified.

FINDINGS WITH THE REASONS

7. In the instant reference, at the preliminary point of

fairness of the enquiry, the Tribunal on consideration of all

relevant facts as per the order No. 31 dt. 25.11.2013 held the

domestic enquiry as fair, proper and in accordance with the

principle of natural justice.

In result, it came up for hearing the final arguments of

both the parties on merits. Mr. S.N. Goswami, the Ld.

Counsel for the petitioner/workman as per his written

arguments has submitted that despite submitting all the

relevant documents such as Identity Card No. 6985 with

the particulars, appointment dt 26.5.1973 and the CFP A/c

No. R-55-2799, the certificate of Vocational Training bearing

No. 370, Service Excerpts duly verified by the Manager

concerned dt. 26.10.1988, the affidavits dated 24.1.1998 and

11.03.2003 of his family details before the Notary Public

and the Executive Magistrate Ramgarh respectively, the

Certificate issued by the Gram Panchyat concerned and

his Identity Card of the Election Commission of the India

and Ration Card and the letter dt. 8.10.2001 related to the

workman, these documents were not considered in course

of the enquiry; so the enquiry was held biasedly, and

accordingly the report of the enquiry being perverse is

unsustainable. Further it is submitted on behalf of the

petitioner workman that after about 26 year of his

4072

THE GAZETTE OF INDIA : OCTOBER 10, 2015/ASVINA 18, 1937

[PART II—SEC. 3(ii)]

continuous service by the workman Bhola Saw, he has

been dismissed by the O.P. /Management on the ground of

impersonation which has not been proved, because neither

the impersonatee brought any complaint against him before

the Management, and lastly that under these

circumstances, the dismissal of petitioner workman for his

alleged misconduct is shockingly disproportionate, illegal

and unjustified, so it is liable to be set aside. As such the

petitioner workman is legally entitled to reinstatement and

full back wages with all the benefits from the date of the

dismissal.

8. Just contrary to it, the contention of Mr. D.K. Verma,

the Ld. Counsel for the O.P./Management, is that real Bhola

Sao, the elder of alleged instant workman by the same name,

was offered employment at Topa Project, CCL Kuju Area in

the year 1973; when he was transferred to Barkakana Area,

aforesaid real workman Bhola Sao had not joined there, but

the instant petitioner workman who is his younger brother

Gultu Sao by impersonating his elder brother Bhola Sao,

the real workman, joined there; for this reason, the instant

petitioner workman working as Bhola Sao was

chargesheeted by the O.P./ Management for his aforesaid

grave misconducts under the Certified Standing Order of

the company. Further submitted by Mr. Verma is that after

due enquiry into it, wherein three prosecution witnesses

were examined and relevant documents were also marked

Exhibits in support of the misconducts of the instant

petitioner workman. In the enquiry, it was found and proved

that the instant petitioner workman was Gultu Sao who

was working by impersonating his elder brother Bhola Sao,

the real workman even after the death of the latter. As such

on the basis of the proved charge for his misconduct, the

instant petitioner workman was dismissed from the service

of the Company for his fraudulently getting the employment

in the Company, through impersonation of his elder brother

Bhola Sao; thus in view of the gravitity of the misconduct,

the dismissal of the petitioner workman is quite

proportionate to the nature of his misconduct as specified

under the Certified Standing Order of the Company; hence

the petitioner workman as Bhola Sao is not entitled to any

relief.

9. Heard of the arguments of both the Learned Counsels

for the respective parties. Perused the materials of both the

parties as available on the case record, I find the facts as

under:

(i) First real workman was Bhola Sao S/o Late Kolha

Sao of Vill. Nimadih, P.S. Mandu, Dist; Hazaribagh

(then State Bihar) was originally but first by

appointed as M/Loader in Topa Colliery under

Kuju Area of M/s. C.C.L. in the year 1973 at the

time of N.C.D.C. He was transferred from there to

the Central Saunda colliery under Barkakana Area

as per the letter S.P.P/II/5175/ 1 dt. 23rd Dec., 1975.

Thereafter, he fell sick, and due to his bad health,

he executed the Ekrarnama on 11.01.1976 ( Ext.

ME 6/1) and entrusted his service to his younger

brother Gultu (Goltu) Sao before Gram panchsy

Charhi, Hazaribagh, subject to the condition that

he (Gultu Sao) would pay for the maintenance of

minor sons (i) Doman Sao and (ii) Mahavir Sao

and (iii) Bodhan Sao, out of whom, on maturity of

said Doman Sao, he(Gultu Sao) would give him

back the service.

(ii) secondly : the instant workman working as Bhola

Sao after fraudulently entry into the service of

the company at Central Saunda got the name of

Sonia Devi, wife of Bhola Sao, Change as Makri

Devi in his voter lists as well as in his service

record as nominee in collusion with the officials

of the Management. (DE 1 Series). On the repeated

complaints dt. 31.12.1997 and 21.1.1998 of Mahavir

Sao, the son of Late Bhola Sao to the Authorities

concerned about the aforesaid events, the

initiation of domestic enquiry into the chargesheet

started. After fairly holding the departmental

enquiry into it, the charges of fraudulent gaining

the employment as a Coal Loader at the Central

Saunda Colliery in the year 1975 in the name of

real workman named Bhola Sao have been proved

as evident from the Enquiry Proceeding and

Enquiry report (Ex.M.8)

(iii) On second show cause Notice dt.18.4.2004 in view

of the grave misconduct of the instant workman,

he was dismissed by the O.P/Management from

the service of the C.C.L. Company. w.e.f 24.04.2004

(Ext. M.10). The appeal of the workman

impersonating Bhola Saw who also accordingly

dismissed as per the office order dt.26.5.2005 of

the Appellate Authority (Ex.M.11).

10. Considering all the aforesaid cogent facts, I am of

the view that the alleged workman Bhola Sao does not

deserve any relief under Sec. 11 A of the Industrial Dispute

Act, 1947, as his dismissal for his grave misconduct proved

under the Certified Standing Order of the Company is quite

proportionate to his misconducts of gross/serious nature.

11. In result, it is, in the terms of the referenced, hereby

responded and accordingly awarded that the action of the

Management of Central Saunda Colliery of M/s CCL. in

dismissing the service of alleged Shri Bhola Sao, Loader

w.e.f. 24.04.2004 is quite justified and legal. Hence, the

workman concerned is not entitled to any relief whatsoever;

rather he is liable to be legally prosecuted for the offence

of impersonation of his elder brother Bhola Sao who had

illegally abandoned his service in favour of his said brother

Gultu Sao to act as Bhola Sao following his transfer to

Saunda Colliery, due to his ill health.

KISHORI RAM, Presiding Officer

¹Hkkx IIó[k.M 3(ii)º

Hkkjr dk jkti=k % vDrwcj 10] 2015@vkf'ou 18] 1937

4073

ubZ fnYYkh] 5 vDrwcj] 2015

dk-vk- 1975-—vkS|ksfxd fookn vf/kfu;e] 1947 ¼1947

dk 14½ dh /kkjk 17 ds vuqlj.k esa] dsUnzh; ljdkj lgkjk bafM;k

lsaVj ds izca/kra= ds lac) fu;kstdksa vkSj muds deZdkjksa ds chp]

vuqca/k esa fufnZ"V vkS|ksfxd fookn esa dsUnzh; ljdkj vkS|ksfxd

vf/kdj.k@Je] U;k;ky; uñ 2] fnYyh ds iapkV ¼lanHkZ la[;k

40@2009½ dks izdkf'kr djrh gS] tks dsUnzh; ljdkj dks 05@10@2015

dks izkIr gqvk FkkA

[lañ ,y&11012@32@2008&vkbZvkj ¼lh,e&I½]

,eñdsñ flag] vuqHkkx vf/kdkjh

New Delhi, the 5th October, 2015

S.O. 1975.—In pursuance of Section 17 of the Industrial

Disputes Act, 1947 (14 of 1947), the Central Government

hereby publishes the Award (Ref. No. 40/2009) of the Cent.

Govt. Indus. Tribunal-cum-Labour Court No. 2, Delhi as shown

in the Annexure, in the industrial dispute between the

management of M/s. Sahara India Centre and their workmen,

received by the Central Government on 05/10/2015.

[No. L-11012/32/2008-IR (CM-I)]

M.K. SINGH, Section Officer

ANNEXURE

CENTRAL GOVERNMENT INDUSTRIAL TRIBUNAL-

CUM-LABOUR COURT-II, DELHI

PRESENT: Shri Harbansh Kumar Saxena

ID. NO. 40/2009

Sh. Ajay Kumar& Others

D-35 A, Shyam Vihar ,

Phase-I, Dinpur, Najafgarh,

New Delhi.

.....Workman

Versus

M/s. Sahara India Centre, 8th floor,

2, Kapoorthala Complex, Aliganj,

Luknow-226024.

.....Management

AWARD

The Central Government in the Ministry of Labour vide

notification No. L-11012/32/2008-IR (CM-I) dated 15.06.2009

referred the following Industrial Dispute to this Tribunal

for adjudication:—

"I. Whether the demand of Sh. Vinod kumar 7 Other

(as annexed) for their absorption in jet Lite by the

management of Jet Airways with reference to the

Share Purchase Agreement of dated 01.04.2007

entered by the management of Jet Airways (India)

Limited, Sahara India Commercial Corporation Limited

and others Sahara Airlines Limited is justified and

legal?

II. To what reliefs are the workmen concerned

entitled?''

On . 02.07.2009 reference was received in this Tribunal.

Which was register as I.D No. 40/2009 and claimants were

called upon to file claim statement with in fifteen days from

date of service of notice. Which was required to be

accompanied with relevant documents and list of witnesses.

After service of notice workmen/claimants filed claim

statement on 23.10.2009. Wherein they prayed as follows:—

It is, therefore, most respectfully prayed that claimants

be absorbed in service in jet Lite by Management of jet

Airways , giving benefits of their seniority and all

consequential benefits on the facts and circumstances as

mentioned above.

1.

Vinod Kumar

EC. 40555

2.

Kapil Dev Bhal

EC. 42630

3.

Amar Singh

EC. 43319

4.

Ajay Kumar

EC. 46788

5.

Naveen Ram

EC. 42462

Against claim statement management filed written

statement on 23.04.2010.

Through which he prayed as follows:—

In view of the above, it is most respectfully prayed that

the present alleged Industrial dispute may kindly be

answered in favour of the M/s. Sahara India commercial

Corporation Ltd. And against the claimants/workmen and

an Award may accordingly be passed in favour of M/s.

Sahara India commercial Corporation Ltd. Holding that the

claimants are not entitled to get any relief.

On 20.02.2014 framed following issues:—

"i. Whether the demand of Sh. Vinod Kumar & Others

(as annexed) for their absorption in Jet Lite by the

management of Jet Airways with reference to the Share

Purchase Agreement of dated 01.04.2007 entered by the

management of Jet Airways (India) Limited, Sahara India

Commercial Corporation Limited and others and Sahara

Airlines Limited is justified and legal? If so, its effect?

ii. What relief the workmen are entitled to?

Fixed 03.04.2014 for workmen evidence.

When workmen have not filed their affidavit inspite of

several opportunities then this tribunal on 25.08.2014 closed

the right of workmen to adduce their evidence and fixed

10.10.2014 for managment evidence.

Burden to prove issue no. 1 lies on workmen. But they

adduce no evidence. Management no. 1 Management in

its evidence produce MW1 Sh. Bharat Bhushan Yadav

who tendered his affidavit in evidence of management

4074

THE GAZETTE OF INDIA : OCTOBER 10, 2015/ASVINA 18, 1937

[PART II—SEC. 3(ii)]

which is exhb.MW1/A. Which bears his signature at point

and A and B. He also placed reliance on documents Exh.

MW 1/1 to Ex. MW1/3. None on behalf of workmen present

to cross-examine him. So cross-examination marked nil. I

have heard the arguments of Ld. A/R for the management.

On 17.08.2015 and reserve award allowing workmen to argue

their case before passing award. But none turn up on behalf

workmen to argue the case. In these circumstances issue

no. 1 is liable to be decided in favour of management and

against workmen on the basis of uncontroverted evidence

of management. Which is accordingly decided.

Issue no. 2 is relating to relief but issue no. 1 has already

been decided against workmen and in favour of

management. Hence workmen are entitled to no relief. So,

issue no. 2 is not required to be decided.

Reference is liable to be decided against workmen and

in faour of management. Which is accordingly decided.

Award is accordingly passed.

Dated: 3.9.2015

HARBANSH KUMAR SAXENA, Presiding Officer

ubZ fnYYkh] 5 vDrwcj] 2015

dk-vk- 1976-—vkS|ksfxd fookn vf/kfu;e] 1947 ¼1947 dk

14½ dh /kkjk 17 ds vuqlj.k esa] dsUæh; ljdkj chlhlh,y ds

izcaèra= ds lac) fu;kstdksa vkSj muds deZdkjksa ds chp] vuqca/k esa

fufnZ"V vkS|ksfxd fookn esa dsUæh; ljdkj vkS|ksfxd vf/kdj.k@Je

U;k;ky; uañ 1] /kuckn ds iapkV ¼lanHkZ la[;k 14@2009½ dks izdkf'kr

djrh gS] tks dsUæh; ljdkj dks 05@10@2015 dks izkIr gqvk FkkA

[lañ ,y&20012@04@2009&vkbZvkj ¼lh,e&I½]

,e- ds- flag] vuqHkkx vf/kdkjh

New Delhi, the 5th October, 2015

S.O. 1976.—In pursuance of Section 17 of the Industrial

Disputes Act, 1947 (14 of 1947), the Central Government

hereby publishes the Award Ref. 14/2009 of the Cent. Govt.

Indus. Tribunal-cum-Labour Court No. 1, Dhanbad as

shown in the Annexure, in the industrial dispute between

the management of M/s. BCCL and their workmen, received

by the Central Government on 05/10/2015.

[No. L-20012/04/2009-IR (CM-I)]

M.K. SINGH, Section Officer

ANNEXURE

BEFORE THE CENTRAL GOVERNMENT

INDUSTRIAL TRIBUNAL NO. 1, DHANBAD.

In the matter of reference U/S 10(1) (d) (2A) of I.D. Act. 1947.

Reference No. 14 of 2009

Employer in relation to the management of P.B. Area,

M/S. BCCL

And

Their workman.

Present:

Sri R. K. Saran, Presiding Officer.

Appearances:

For the Employers :—

Shree D.K. Verma, Advocate.

For the Workman :—

Shree S.P. Rakshit, Advocate.

State : Jharkhand

Industry : Coal

Dated: 7/9/2015

AWARD

By order No. L-20012/04/2009 IR-(CM-1), dated

26/03/2009, the Central Govt. in the Ministry of Labour

has, in exercise of powers conferred by clause (d) of sub-

section (1) and sub-section (2A) of Section 10 of the

Industrial Disputes Act. 1947, referred the following

disputes for adjudication to this Tribunal:

SCHEDULE.

"Whether the action of the management of P.B. Area

of M/S BCCL in not regularising the service of

Sri Shiv Prasad Yadav as Banks man is justified and

legal? (ii) To what relief is the workman concerned

entitled and from what date ?"

2. The case is received from the Ministry of Labour on

13.04.2009. After receipt of reference, both parties are

noticed. The Sponsoring Union files their written statement

on 16/08/2010. After long delay the management files their

written statement-cum-rejoinder on 19.12.2012. Two

witnesses examined on behalf of the workman and

document of workman marked as W-1 to W-4.

3. The case of workman is that the management is not

promoting the concerned workman as Banksman since

2002. The aforesaid post is a permanent post and prior to

the concerned workman another workman was holding

same post and after retirement, the present workman is

holding the post from the date of his retirement i.e. from

2002. The concerned workman has not been paid with the

Banksman salary from the year 2002. But the management

forcefully taking the work of Banksman from the workman

concerned. It is also said the concerned workman is

performing the duties as Banksman without getting salary

of Banksman. The demand of the workman is to regularise

him in the service as Banksman, from 2002.

4. The case of the management is that the workman

concerned is permanent employee and designated as

onsetter. Since the job of onsetter and Banksman are similar,

he was deployed temporarily to work as Banksman against

¹Hkkx IIó[k.M 3(ii)º

Hkkjr dk jkti=k % vDrwcj 10] 2015@vkf'ou 18] 1937

4075

leave and sick vacancy. The workman is an underground

workers. The underground worker is not entitled tor

regularision in surface.

5. The workman claims that though he is working as

Banksman in the mines from 2002 as per the direction of

mines manager, he be given the designation of Banksman.

6. The management does not dispute the position, but

deny to give him the designation.

7. On quarry, it is learnt, that there will be no financial

loss to the management on which the manager of south

Balihari colliery recommend and putting the note that the

workman is performing the duties as Banksman since long.

He also reported that the post of Banksman is shortage as

per manpower Budget. He also recommended as he has

been working as Banksman properly.

8. Considering the facts and circumstances of this case

and perusing the documents of parties, I hold that the

action of the management of P.B. Area of M/S. BCCL in not

regularising the service of Sri Shiv Prasad Yadav as

Banksman is not justified. Hence the management is

directed to give the workman Banksman designation soon

after the publication of the award and regularised him in

the said post.

This is my award.

R.K. SARAN, Presiding Officer

Uploaded by Dte. of Printing at Government of India Press, Ring Road, Mayapuri, New Delhi-110064

and Published by the Controller of Publications, Delhi-110054.