4411 GI/2018
(5039)
jftLVªh la- Mh- ,y- (,u) 04@0007@2003µ05
REGD. No. D. L. (N) 04/0007/2003—05
izkf/dkj ls izdkf'kr
PUBLISHED BY AUTHORITY
lkIrkfgd
WEEKLY
la- 31]
ubZ fnYyh] vxLr 5—vxLr 11] 2018] '[email protected] 14—Jko.k 20] 1940
No. 31]
NEW DELHI, AUGUST 5—AUGUST 11, 2018, SATURDAY/SRAVANA 14—SRAVANA 20, 1940
bl Hkkx esa fHkUu i`"B la[;k nh tkrh gS ftlls fd ;g i`Fkd ladyu ds :i esa j[kk tk lds
Separate Paging is given to this Part in order that it may be filed as a separate compilation
Hkkx II—[k.M 3—mi&[k.M (ii)
PART II—Section 3—Sub-section (ii)
Hkkjr ljdkj ds ea=kky;ksa (j{kk ea=kky; dks NksM+dj) }kjk tkjh fd, x, lkafof/d vkns'k vkSj vf/lwpuk,a
Statutory Orders and Notifications Issued by the Ministries of the Government of India
(Other than the Ministry of Defence)
िव मंालय
िव मंालय
िव मंालय
िव मंालय
(िवीय सेवाएं िवभाग
िवीय सेवाएं िवभाग
िवीय सेवाएं िवभाग
िवीय सेवाएं िवभाग)
नई दली, 8 अगत, 2018
का.आ.
का.आ.
का.आ.
का.आ. 1167
1167
1167
1167.—भारतीय िनयात-आयात बक अिधिनयम, 1981 (1981 का 28) क धारा 6 क उपधारा (1) के खंड (ड.) के
उपखंड (i) के अनुसरण म!, के"#ीय सरकार, एत%ारा, सु&ी रीता ए. तेवितया के थान पर वािण*य िवभाग म! सिचव, &ी अनूप वधावन
(आईएएस - यूके: 1985) को त3काल 4भाव से, अगले आदेश6 तक भारतीय िनयात-आयात बक (एि8जम बक) के िनदेशक म:डल म!
िनदेशक के पद पर नािमत करती है।
[फा.सं. 9/16/2012-आईएफ-I]
सौ=यिजत घोष, अवर सिचव
5040
THE GAZETTE OF INDIA : AUGUST 11, 2018/SRAVANA 20, 1940
[PART II—SEC. 3(ii)]
MINISTRY OF FINANCE
(Department of Financial Services)
New Delhi, the 8th August, 2018
S.O. 1167.—In pursuance of Sub-clause (i) of Clause (e) of sub-section (1) of Section 6 of the Export Import
Bank of India Act, 1981 (28 of 1981), the Central Government hereby nominates Sh. Anup Wadhawan (IAS – UK :
1985), Secretary, Department of Commerce as Director on the Board of Director of Export Import Bank of India (EXIM
Bank) vice Ms. Rita A. Teaotia with immediate effect until further orders.
[F. No. 9/16/2012-IF-I]
SOUMYAJIT GHOSH, Under Secy.
dkfeZd] yksd f'kdk;r rFkk isa'ku ea=ky;
¼dkfeZd vkSj izf'k{k.k foHkkx½
ubZ fnYyh] 28 tqykbZ] 2018
dk-vk- 1168.—dsUnzh; ljdkj ,rn~}kjk fnYyh fo'ks"k iqfyl LFkkiuk vf/kfu;e] 1946 ¼1946 dk vf/kfu;e la[;k
25½ dh /kkjk 6 ds lkFk ifBr /kkjk 5 dh mi/kkjk 1 }kjk iznRr 'kfDr;ksa dk iz;ksx djrs gq, fcgkj jkT; ljdkj] x`g ¼iqfyl½
foHkkx dh vf/klwpuk la[;k &8 lh-ch-vkbZ-&80&10@2018&6537@x`0vk0 la[;k fnukad 26 tqykbZ 2018 efgyk ¼eqtÝQjiqj½
Fkkuk dkaM la[;k 33@2018 fnukad 31@05@2018 /kkjk 120¼ch-½@376@34 Hkk- n- fo- ,oa 4@6@8@10@12 ikWDlks ,DV]
tks lkgq jksM] eqtÝQjiqj fLFkr ckfydk x`g esa vkokflr ckfydkvksa ds lkFk ekufld] 'kkfjfjd ,oa ;kSu 'kks"k.k ls lacaf/kr
izdj.k ,oa iz;Ru] nqLiszj.k vkSj "kM~;a= rFkk mlh laO;ogkj ds vuqØe esa fd;s x;s vFkok mUgha rF;ksa ls mn~Hkwr fdlh vU;
vijk/k dk vUos"k.k djus ds fy, fnYyh fo'ks"k iqfyl LFkkiuk ds lnL;ksa dh 'kfDr;ksa vkSj vf/kdkfjrk dk foLrkj laiw.kZ fcgkj
jkT; ij djrh gSA
[iQk- la- 228@34@2018&,ohMh&II]
,l- ih- vkj- f=kikBh] voj lfpo
MINISTRY OF PERSONNEL, PUBLIC GRIEVANCES AND PENSIONS
(Department of Personnel and Training)
New Delhi, the 28th July, 2018
S.O. 1168.—In exercise of the powers conferred by sub-section (1) of section 5 read with section 6 of the Delhi
Special Police Establishment Act, 1946 (Act No. 25 of 1946), the Central Government with the consent of the State
Government of Bihar, Home (Police) Department, vide Notification No. 8/C.B.I 80-10/2018-6537/HP dated 26 July,
2018 hereby extends powers and jurisdiction of the members of the Delhi Special Police Establishment to the whole of
the State of Bihar to investigate/supervise and inquire into the Mahila (Muzaffarpur) P.S. Case No. 33/2018 dated
31.05.2018, u/s 120(B), 376, 34 IPC and 4/6/8/10/12 POCSO Act related to mental, physical and sexual exploitation of
girl children residing at Children Home situated at Sahu Road, Muzaffarpur and any other offence/offences committed in
the course of the same transaction or arising out of the same facts.
[F. No. 228/34/2018-AVD-II]
S. P. R. TRIPATHI, Under Secy.
नई दली, 1 अग त, 2018
का.आ.
का.आ.
का.आ.
का.आ. 1169
1169
1169
1169.—dsUnzh; सरकार दंड 4?या संिहता, 1973 (1974 का 2) क धारा 24 क उपधारा (8) Fारा 4GH शिIय6
का 4योग करते Jए &ी दK य * योित दास और टूटूमिण देव गो वामी, अिधव8 ताM को आसाम बम N ला ट मामले के संबंध म! और िवशेष
" यायालय, कामQप (एम) गोवाहाटी के समR सैशन मामला, 2011 का संT यांक 59(के) Qप म! रिज Uकृत, दली िवशेष पुिलस थापन
(सीबीआई) Fारा संि थत मामला संT यांक आरसीडीएसटी2008एस2003 से 0011 म! अिभयोजन और उ8 त सैशन मामले म! उ3 प" न
अपील, पुनरीRण और कारवाइय6 का दली िवशेष पुिलस थापन (सीबीआई) क ओर से संचालन करने के िलए िनयुि8 त क तारीख से
तीन वष क अ विध या मामले के िनपटान, जो भी पहले हो, िवशेष लोक अिभयोजक6 के Qप म! िनयु8 त करती है।
[iQk- la- 225@08@2018&,ohMh&II]
,l- ih- vkj- f=kikBh] voj lfpo
¹Hkkx IIµ[k.M 3(ii)º
Hkkjr dk jkti=k % vxLr 11] [email protected] 20] 1940
5041
New Delhi, the 1st August, 2018
S.O. 1169.—In exercise of the powers conferred by sub-section (8) of section 24 of the Code of Criminal
Procedure, 1973 (2 of 1974), the Central Government hereby appoints Shri Dibyajyoti Das and Shri Tutumoni Deva
Goswami, Advocates as Special Public Prosecutors for conducting prosecution of case Number RC/DST/2008/S/2003 to
0011, instituted by the Delhi Special Police Establishment (CBI), pertaining to the Assam Bomb Blast case and
registered as session case Number 59(K) of 2011, before the Special Court, Kamrup (M), Guwahati, Assam, and appeals,
revisions or other proceeding arising out of the said session case, on behalf of the Delhi Special Police Establishment
(CBI), for a period of three years from the date of appointment or disposal of the case, whichever is earlier.
[F. No. 225/08/2018-AVD-II]
S. P. R. TRIPATHI, Under Secy.
मानव संसाधन िवकास मंालय
मानव संसाधन िवकास मंालय
मानव संसाधन िवकास मंालय
मानव संसाधन िवकास मंालय
(उ च
उ च
उ च
उ चतर िशा िवभाग
तर िशा िवभाग
तर िशा िवभाग
तर िशा िवभाग)
(राजभाषा भाग
राजभाषा भाग
राजभाषा भाग
राजभाषा भाग)
नई द ली, 31 जुलाई, 2018
का.आ.
का.आ.
का.आ.
का.आ. 1170
1170
1170
1170.—के" #ीय सरकार, राजभाषा (संघ के शासकय 4योजन6 के िलए 4योग) िनयम, 1976 के िनयम 10 के उप िनयम
4 के अनुसरण म!, मानव संसाधन िवकास मं[ालय (स् कूल िशRा एवं साRरता िवभाग) के अंतगत िन= निलिखत कायालय6 को, ऐसे
कायालय6 के Qप म!, िजनके 80 4ितशत से अिधक कमचारी-वृ" द ने िह" दी का कायसाधक ^ान 4ा_ त कर िलया है, अिधसूिचत करती है:-
1.
क!#ीय िव`ालय बूंदी, गेट नं. 3 नैनवा रोड, बूंदी (राज थान)
2.
क!#ीय िव`ालय ?मांक 7 जयपुर, के.औ.सु.ब. 61, कुंडा रोड, जयपुर- 302028
3.
क!#ीय िव`ालय हनुमानगढ़ (जं8 शन) – 335001
4.
क!#ीय िव`ालय आई.आई.टी. जोधपुर एन.एस.- 65 नागौर रोड करवड़ आईआईटी कै= पस
जोधपुर – 342037 (राज थान)
5.
क!#ीय िव`ालय सीयूराज, बांदर bसदरी राc Uीय राजमाग- 8
तहसील कशनगढ़, िजला अजमेर, राज थान – 305817
6.
क!#ीय िव`ालय नागौर, Fारा - राजकय बािलका उd च 4ाथिमक िव`ालय, eाम पंचायत
भवन के पास, ताउसर रोड, नागौर – 341001 (राज थान)
7.
क!#ीय िव`ालय जैिस" धर, गाँव - जैिस" धर टेशन,
तहसील- गडरा रोड, िजला- बाड़मेर
8.
क!#ीय िव`ालय जालोर, िशवाजी नगर, जालोर – 343001 (राज थान)
9.
क!#ीय िव`ालय दौसा, लालसोट रोड़, दौसा - 303303 (राज थान)
10.
क!#ीय िव`ालय संगठन, Rे[ीय कायालय, रायपुर,
(क!#ीय िव`ालय नं. 02 पfरसर, सै8 टर-IV)
पंिडत दीनदयाल उपाg याय नगर, रायपुर (छ3 तीसगढ़) - 492010
5042
THE GAZETTE OF INDIA : AUGUST 11, 2018/SRAVANA 20, 1940
[PART II—SEC. 3(ii)]
11.
क!#ीय िव`ालय पांढुणा, = युिनिसपल बोjडग भवन, पांढुणा
िजला- bछदवाड़ा, मg य 4देश - 480334
12.
क!#ीय िव`ालय अमरकंटक, इं.गाँ.रा.ज.िव.िव. पfरसर,
लालपुर, अमरकंटक, मg य 4देश - 484886
13.
नवोदय िव`ालय सिमित, Rे[ीय कायालय, चंडीगढ़ - 160032
14.
जवाहर नवोदय िव`ालय, अलीगढ़, उ3 तर 4देश - 202141
15.
जवाहर नवोदय िव`ालय, अंबेडकर नगर, उ3 तर 4देश – 224235
16.
जवाहर नवोदय िव`ालय, बिलया, उ3 तर 4देश - 221701
17.
जवाहर नवोदय िव`ालय, बलरामपुर, उ3 तर 4देश – 271201
18.
जवाहर नवोदय िव`ालय, बांदा, उ3 तर 4देश – 210001
19.
जवाहर नवोदय िव`ालय, गािजयाबाद, उ3 तर 4देश – 245304
20.
जवाहर नवोदय िव`ालय, लखनऊ, उ3 तर 4देश – 226008
21.
जवाहर नवोदय िव`ालय, महाराजगंज, उ3 तर 4देश – 273303
22.
जवाहर नवोदय िव`ालय, िमजापुर, उ3 तर 4देश – 231309
23.
जवाहर नवोदय िव`ालय, पीलीभीत, उ3 तर 4देश – 262201
24.
जवाहर नवोदय िव`ालय, संत कबीर नगर, उ3 तर 4देश – 272164
25.
जवाहर नवोदय िव`ालय, बागेm वर, उ3 तराखंड – 263641
[फा.सं.11011-2/2018-रा.भा.ए.]
संजय कुमार िस" हा, संयु8 त सिचव
MINISTRY OF HUMAN RESOURCE DEVELOPMENT
(Department of Higher Education)
(O.L. UNIT)
New Delhi, the 31st July, 2018
S.O. 1170.—In pursuance of sub-rule (4) of rule 10 of the Official Languages (Use for Official Purposes of the
Union) Rules, 1976, the Central Government hereby notifies the following offices under the Ministry of Human Resource
Development, (Department of School Education & Literacy) as office, whose more than 80% members of the staff have
acquired working knowledge of Hindi:-
1.
Kendriya Vidyalaya Bundi, Gate No. 3 Nainva Road, Bundi (Rajasthan)
2.
Kendriya Vidyalaya No. 7, CISF, 61, Kunda Road, Jaipur – 302028
¹Hkkx IIµ[k.M 3(ii)º
Hkkjr dk jkti=k % vxLr 11] [email protected] 20] 1940
5043
3.
Kendriya Vidyalaya Hanumangarh (JN) - 335001
4.
Kendriya Vidyalaya IIT Jodhpur, NH-65, Nagaur Road, Karwar IIT Campus
Jodhpur – 342037 (Rajasthan)
5.
Kendriya Vidyalaya CURAJ, Bandar Sindri, NH – 8 , Tehsil- Kishangarh
Dist. Ajmer, Rajasthan- 305817
6.
Kendriya Vidyalaya Nagaur, C/o Govt.Girls Upper Primary School
Near Gram Panchayat Bhawan, Tausar Road, Nagaur – 341001 (Rajasthan)
7.
Kendriya Vidyalaya Jaisindhar, Village - Jaisindhar Station,
Tehsil - Gadra Road, Distt- Barmer
8.
Kendriya Vidyalaya Jalore, Shivaji Nagar
Jalore – 343001 (Rajasthan)
9.
Kendriya Vidyalaya Dausa, Lalsot Road, Dausa- 303303 (Rajasthan)
10.
Kendriya Vidyalaya Sangathan, Regional Office, Raipur,
(Kendriya Vidyalaya No. 2, Campus Sector - IV)
Pt. Dindayal Upadhyay Nagar, Raipur (Chhattisgarh) - 492010
11.
Kendriya Vidyalaya Pandhurna, Municipal Boarding Building,
Pandhurna, Distt.- Chhindwara Madhya Pradesh - 480334
12.
Kendriya Vidyalaya Amarkantak, IGNTU Campus Lalpur, Amarkantak,
Madhya Pradesh - 484886
13.
Navodaya Vidyalaya Samiti, Regional Office, Chandigarh-160032
14.
Jawahar Navodaya Vidyalaya, Aligarh, Uttar Pradesh - 202141
15.
Jawahar Navodaya Vidyalaya, Ambedkar Nagar, Uttar Pradesh - 224235
16.
Jawahar Navodaya Vidyalaya, Ballia, Uttar Pradesh - 221701
17.
Jawahar Navodaya Vidyalaya, Balrampur, Uttar Pradesh - 271201
18.
Jawahar Navodaya Vidyalaya, Banda, Uttar Pradesh - 210001
19.
Jawahar Navodaya Vidyalaya, Ghaziabad, Uttar Pradesh - 245304
20.
Jawahar Navodaya Vidyalaya, Lucknow, Uttar Pradesh – 226008
21.
Jawahar Navodaya Vidyalaya, Maharajganj, Uttar Pradesh - 273303
22.
Jawahar Navodaya Vidyalaya, Mirzapur, Uttar Pradesh - 231309
23.
Jawahar Navodaya Vidyalaya, Pilibhit, Uttar Pradesh - 262201
24.
Jawahar Navodaya Vidyalaya, Sant Kabir Nagar, Uttar Pradesh - 272164
25.
Jawahar Navodaya Vidyalaya, Bageshwar, Uttarakhand - 263641
[F. No. 11011-2/2018-OLA]
SANJAY KUMAR SINHA, Jt. Secy.
5044
THE GAZETTE OF INDIA : AUGUST 11, 2018/SRAVANA 20, 1940
[PART II—SEC. 3(ii)]
[kku ea=kky;
ubZ fnYyh] 2 vxLr] 2018
dk-vk- 1171-—dsaæh; ljdkj] jktHkk"kk (la?k ds 'kkldh; iz;kstuksa ds fy, iz;ksx) fu;e] 1976 ds fu;e 10 ds mifu;e (4) ds
vuqlj.k esa] [kku ea=kky; ds fuEufyf[kr dk;kZy;] ftlds 80 izfr'kr ls vf/d vf/dkfj;ksa@deZpkfj;ksa us ¯gnh dk dk;Zlk/d Kku izkIr
dj fy;k gS] ,rn~}kjk vfèklwfpr djrh gS %&
1- ¯gnqLrku dkWij fyfeVsM] rykstk dkWij izkstsDV A
¹iQk- la- bZ&16031@2@2017&¯gnhº
vkyksd paæ] vk£Fkd lykgdkj
MINISTRY OF MINES
New Delhi, the 2nd August, 2018
S.O. 1171.—In pursuance of Sub-rule (4) of Rule 10 of the Official Languages (Use for Official Purposes of the
Union) Rules, 1976, the Central Government hereby notifies the following office, under the Ministry of Mines, whose
more than 80% staff have acquired the working knowledge of Hindi :—
1.
Hindustan Copper Limited, Taloja Copper Project
[F. No. E-16031/2/2017- Hindi]
ALOK CHANDRA, Economic Advisor
कोयला मंालय
कोयला मंालय
कोयला मंालय
कोयला मंालय
नई द ली, 6 अगत, 2018
का
का
का
का.आ. . . . 1172
1172
1172
1172.—के" #ीय सरकार ने कोयला धारक Rे[ (अजन और िवकास) अिधिनयम, 1957 (1957 का 20) ( िजसे
इसम! इसके पm चात् उ8 त अिधिनयम कहा गया है ) क धारा 4 क उपधारा (1) के अधीन भारत सरकार ने कोयला मं[ालय Fारा
जारी क गई अिधसूचना संT यांक का. आ. 2899 (अ), तारीख 7 िसत= बर, 2016, जो भारत के राजप[ के भाग ।।, ख: ड 3, उपख: ड
(ii), तारीख 8 िसत= बर, 2016 म! 4कािशत क गई थी, उस अिधसूचना से उपाबo अनुसूची म! िविनpदc ट पfरRे[ क भूिम म! िजसका
माप 42.01 हे8 टर (लगभग) या 103.81 एकड़ (लगभग) है, कोयले का पूवqRण करने के अपने आशय क सूचना दी थी ;
और के" #ीय सरकार का यह समाधान हो गया है क इस अिधसूचना से संलr न अनुसूची म! िविहत उ8 त भूिम के भाग म!
कोयला अिभ4ा_य है ;
इस अिधसूचना के अधीन आने वाले Rे[ के रेखांक संT यांक सी-I(ई) ।।।/जेजेजे/940-0618, तारीख 7 जून, 2018 का
िनरीRण कल8 टर, िजला चं#पुर (महाराs) के कायालय म! या कोयला िनयं[क, 1, काउंिसल हाउस Uीट, कोलकाता- 700 001 के
कायालय म! या महा4बंधक, वे टन कोलफ uस िलिमटेड (राज व िवभाग), कोल इ टेट, िसिवल लाई" स, नागपुर - 440 001
(महाराc U) के कायालय म! कया जा सकता है ।
इस अिधसूचना से संलv अनुसूची म! वwणत भूिम म! िहतबo xिI, उस तारीख िजसको राजप[ म! 4कािशत इस अिधसूचना
क 4ितयां जनता को उपलNध करा दी जाती है, से तीस दन के भीतर, संपूण भूिम या उसके कसी भाग या ऐसी भूिम म! या उस पर
क"हz अिधकार6 के संबंध म! सRम 4ािधकारी क उI अिधिनयम क धारा 8 के अधीन िलिखत म! आRेप फाइल कर सकेगा;
और के" #ीय सरकार Fारा कोयला िनयं[क, 1, काउंिसल हाउस Uीट, कोलकाता-700 001 को भारत के राजप[, भाग ।।,
खंड 3, उप-खंड (ii) तारीख 11 जून, 1983 म! 4कािशत का. आ. 2519, तारीख 27 मई, 1983 Fारा उI अिधिनयम क, धारा 3 के
अधीन सRम 4ािधकारी िनयु8 त कया गया है ।
अत:, अब, के" #ीय सरकार उ8 त अिधिनयम क धारा 7 क उप-धारा (1) Fारा 4द3 त शि8 तय6 का 4योग करते Jए, इससे
संलr न अनुसूची म! वjणत 42.01 हे8 टर (लगभग) या 103.81 एकड़ (लगभग) माप वाली भूिम म! या उस पर के सभी अिधकार का
अजन करने के अपने आशय क सूचना देती है ।
¹Hkkx IIµ[k.M 3(ii)º
Hkkjr dk jkti=k % vxLr 11] [email protected] 20] 1940
5045
अनु
अनु
अनु
अनुसूची
सूची
सूची
सूची
साखरी-ईरावती (पौनी - ।।।) िववृत खान भाग - ।। (शेष Rे[)
ब लारपुर Rे[
िजला चं#पुर (महाराc U)
[रेखांक संT या सी-I(ई)।।।/जेजेजे/940- 0618, तारीख 7 जून, 2018]
सभी अिधकार :
सभी अिधकार :
सभी अिधकार :
सभी अिधकार :
?म
सं.
eाम का नाम
पटवारी
सpकल
संT या
तहसील
िजला
Rे[फल (हे8 टर म!)
कुल
fट_पिणयां
अिभधृित
सरकारी
वन
1
िहरापुर
(भाग – ।)
3
राजुरा
चं#पुर
28.25
-
-
28.25
भाग
2
bचचोली (खुद)
(भाग – ।)
3
राजुरा
चं#पुर
9.05
1.52
-
10.57
भाग
3
bचचोली (खुद)
(भाग – ।।)
3
राजुरा
चं#पुर
-
3.19
-
3.19
भाग
कुल :
37.30
4.71
-
42.01
कुल Rे[फल : 42.01 हे8 टर (लगभग)
या 103.81 एकड़ (लगभग)
भाग
भाग
भाग
भाग - ।
eाम िहरापुर के अwजत कए जाने वाले _ लाट संT यांक :
18, 19, 20, 21, 33, 40, 41, 42, 47/1- 47/2, 48, 49.
eाम bचचोली (खुद) के अwजत कए जाने वाले _ लाट संT यांक :
248, 249, 250, 251, 252, 271, सड़क, नाला ।
भाग
भाग
भाग
भाग - ।।।।।।।।
eाम bचचोली (खुद) के अwजत कए जाने वाले _ लाट संT यांक :
225 (सरकारी) .
सीमा
सीमा
सीमा
सीमा- वणन :
वणन :
वणन :
वणन :
भाग
भाग
भाग
भाग - ।
क – ख :
रेखा, eाम साखरी और eाम िहरापुर क सि= मिलत eाम पर िबन् दु ‘क’ से आरंभ होती है और eाम िहरापुर से
होते Jए िब" दु 'ख' पर िमलती है ।
5046
THE GAZETTE OF INDIA : AUGUST 11, 2018/SRAVANA 20, 1940
[PART II—SEC. 3(ii)]
ख – ग :
रेखा, eाम िहरापुर से होकर गुजरती है, फर eाम िहरापुर और bचचोली (खुद) क सि= मिलत सीमा के साथ-साथ
गुजरती है, उसके पm चात् रेखा eाम bचचोली (खुद) से होकर गुजरती है और िब" दु 'ग' पर िमलती है।
x & ?k %
js[kk] xzke fpapksyh ¼[kqnZ½ ls gksdj xqtjrh gS fQj ikSuh ukys dks ikj djrh gS ckn esa ikSuh ukys ds
fdukjs ls yxdj tkrh gS fQj ikSuh ukys dks ikj djrh gS vkSj ukys ds fdukjs ij fcUnq ‘?k’ ij feyrh
gSA
?k & M- %
js[kk] xzke fpapksyh ¼[kqnZ½ ls gksdj xqtjrh gS fQj xzke fpapksyh ¼[kqnZ½ ,oa xzke fgjkiqj dh lEfefyr
lhek dks ikj djrh gS fQj xzke fgjkiqj ls gksdj xqtjrh gS vkSj fcUnq ‘M-’ ij feyrh gS A
M- & p %
js[kk] xzke fgjkiqj ls gksdj xqtjrh gS vkSj xzke fgjkiqj vkSj lk[kjh dh lEfefyr lhek ij fcUnq ^p* ij
feyrh gS A
p & d %
js[kk] xzke fgjkiqj ,oa lk[kjh dh lEfefyr lhek ds lkFk&lkFk xqtjrh gS vkSj vkjafHkd fcUnq ‘d’ ij
feyrh gS A
Hkkx & AA
lhek o.kZu
N & t %
js[kk] xzke fpapksyh ¼[kqnZ½ esa ikSuh ukys ds fdukjs ls fcUnq ^N* ls vkjaHk gksrh gS fQj ikSuh ukys ds
fdukjs ls tkdj ikSuh ukys ds fdukjs ij fcUnq ^t* ij feyrh gS A
t&>&N %
js[kk] xzke fpapksyh ¼[kqnZ½ ls gksdj xqtjrh gS fQj fcUnq ^>* ds ikl ls yxdj xqtjrh gqbZ ikSuh ukys
ij vkjafHkd fcUnq ^N* ij feyrh gS A
[Qk- la- 43015@7@2018&,y, ,.M vkbZvkj]
jke f’kjksef.k ljkst] voj lfpo
MINISTRY OF COAL
New Delhi, the 6th August, 2018
S.O. 1172.—Whereas by the notification of the Government of India in the Ministry of Coal number S. O. 2899
(E), dated the 7th September, 2016 issued under sub-section (1) of section 4 of the Coal Bearing Areas (Acquisition and
Development) Act, 1957 (20 of 1957) (hereinafter referred to as the said Act) and published in the Gazette of India
Extraordinary, Part II, Section 3, Sub-section (ii), dated the 8th September, 2016, the Central Government gave notice of
its intention to prospect for coal in 42.01 hectares (approximately) or 103.81 acres (approximately) of the land in the
locality specified in the schedule annexed to that notification ;
And whereas the Central Government is satisfied that coal is obtainable in a part of the said land described in
the schedule appended thereto;
The plan bearing number C-I(E)III/JJJ/940-0618, dated the 7th June, 2018 of the area covered by this
notification may be inspected in the office of the Collector, District Chandrapur (Maharashtra) or in the office of the Coal
Controller, 1, Council House Street, Kolkata - 700 001 or in the office of the General Manager, Western Coalfields
Limited (Revenue Department), Coal Estate, Civil Lines, Nagpur – 440 001 (Maharashtra).
Any person interested in the land described in the schedule appended to this notification may, within thirty days
from the date on which copies of this notification published in the Gazette are made available to the general public, file
objection in writing under section 8 of the said Act to the competent authority with regard to the acquisition of the whole
or any part of the land or any rights in or over such land.
And whereas the Coal Controller,1, Council House Street, Kolkata-700 001 has been appointed the competent
authority under section 3 of the said Act by the Central Government vide number S. O. 2519, dated the 27th May, 1983,
published in Part II, Section 3, Sub-section (ii) of the Gazette of India, dated the 11th June, 1983.
Now, therefore, in exercise of the powers conferred by sub-section (1) of section 7 of the said Act, the Central
Government hereby gives notice of its intention to acquire all rights in or over the land measuring 42.01 hectares
(approximately) or 103.81 acres (approximately) described in the Schedule appended hereto.
¹Hkkx IIµ[k.M 3(ii)º
Hkkjr dk jkti=k % vxLr 11] [email protected] 20] 1940
5047
SCHEDULE
Sakhari-Irawati (Pauni – III) Opencast Mine Part – II (Balance Area)
Ballarpur Area
District Chandrapur (Maharashtra)
[Plan bearing number C-1(E)III/JJJ/940- 0618, dated the 7th June, 2018]
All Rights :
Sl.
No.
Name of
Village
Patwari
Circle
number
Tahsil
District
Area (in hectares)
Total
Remarks
Tenancy
Govt.
Forest
1.
Hirapur
(Part – I)
3
Rajura
Chandrapur
28.25
-
-
28.25
Part
2.
Chincholi
(Khurd)
(Part – I)
3
Rajura
Chandrapur
9.05
1.52
-
10.57
Part
3.
Chincholi
(Khurd)
(Part – II)
3
Rajura
Chandrapur
-
3.19
-
3.19
Part
Total :
37.30
4.71
-
42.01
-
Total area : 42.01 hectares (approximately)
or 103.81 acres (approximately)
Part – I
Plot numbers to be acquired in village Hirapur :
18, 19, 20, 21, 33, 40, 41, 42, 47/1- 47/2, 48, 49.
Plot numbers to be acquired in village Chincholi (Khurd) :
248, 249, 250, 251, 252, 271, Road, Nallah.
Part - II
Plot numbers to be acquired in village Chincholi (Khurd) :
225 (Government).
Boundary description:
Part – I
A – B :
Line starts from Point 'A' on the common village boundary of villages Sakhari and Hirapur, then
line passes through village Hirapur and meets at Point 'B'.
B – C :
Line passes through village Hirapur, then passes along the common village boundary of villages
Hirapur and Chincholi (Khurd). Then line passes through village Chincholi (Khurd) and meets at
Point 'C'.
C – D :
Line passes through village Chincholi (Khurd) and crosses Pauni Nallah then passes along the bank
of Pauni Nallah, again crosses Pauni Nallah and meets at Point 'D'.
5048
THE GAZETTE OF INDIA : AUGUST 11, 2018/SRAVANA 20, 1940
[PART II—SEC. 3(ii)]
D – E :
Line passes through village Chincholi (Khurd), then line crosses the common village boundary of
villages Chincholi (Khurd) and Hirapur, then line passes through village Hirapur and meets at Point
'E'.
E – F :
Line passes through village Hirapur and meets at Point ‘F’ on the common village boundary of
villages Hirapur and Sakhari.
F – A :
Line passes along the common village boundary of villages Hirapur and Sakhari and meets at
starting Point ‘A’.
Part - II
Boundary description :
G – H :
Line starts from Point ‘G’ on the bank of Pauni Nallah in village Chincholi (Khurd) and passes
along the bank of Pauni Nallah and meets at Point ‘H’.
H - I - G :
Line passes through village Chincholi (Khurd) and passes nearby Point ‘I’ and meets at starting
Point ‘G’on bank of Pauni Nallah.
[F. No. 43015/7/2018- LA&IR)
RAM SHIROMANI SAROJ, Under Secy.
Je ,oa jkstxkj ea=kky;
ubZ fnYyh] 1 vxLr] 2018
dk-vk- 1173-—vkS|ksfxd fookn vf/fu;e] 1947 (1947 dk 14) dh èkkjk 17 ds vuqlj.k esa dsUnzh; ljdkj eSllZ nSrkjh
vk;ju vksj izkstsDV vkWiQ eSllZ vks-,e-lh- fyfeVsM ds çcaèkra=k ds lac¼ fu;kstdksa vkSj muds deZdkjksa ds chp] vuqcaèk esa fu£n"V
vkS|ksfxd fookn esa dsUnzh; ljdkj vkS|ksfxd vfèkdj.k ,oa Je U;k;ky;] Hkqous'oj ds iapkV (lanHkZ la[;k 66@2002) dks çdkf'kr
djrh gS] tks dsUnzh; ljdkj dks 27-07-2018 dks çkIr gqvk FkkA
¹la- ,y&29012@3@2002&vkbZvkj (,e)º
Mh- ds- fgeka'kq] voj lfpo
MINISTRY OF LABOUR AND EMPLOYMENT
New Delhi, the 1st August, 2018
S.O. 1173.—In pursuance of Section 17 of the Industrial Disputes Act, 1947 (14 of 1947), the Central
Government hereby publishes the Award (Ref. No. 66/2002) of the Central Government Industrial Tribunal/Labour
Court, Bhubaneswar now as shown in the Annexure, in the industrial dispute between the employers in relation to the
management of M/s. Daitari Iron Ore Project of M/s. O.M.C. Ltd. and their workman, which was received by the Central
Government on 27.07.2018.
[No. L-29012/3/2002-IR (M)]
D. K. HIMANSHU, Under Secy.
ANNEXURE
CENTRAL GOVERNMENT INDUSTRIAL TRIBUNAL-CUM-LABOUR COURT, BHUBANESWAR
Present:
Shri B.C. Rath,
Presiding Officer, C.G.I.T.-cum-Labour
Court, Bhubaneswar
INDUSTRIAL DISPUTE CASE NO. 66/2002
Date of Passing Award – 22nd June, 2018
¹Hkkx IIµ[k.M 3(ii)º
Hkkjr dk jkti=k % vxLr 11] [email protected] 20] 1940
5049
Between:
The Management of the General Manager,
Daitari Iron Ore Project of M/s. OMC Ltd.,
At./Po. Talapada, dist. Keonjhar
…1st Party-Management
(And)
Their Workman, Shri Biranchi Prasad Jena,
Mali, Daitari Iron Ore Project of M/s.OMC
Limited, Keonjhar
…2nd Party-Workman
Appearances :
M/s. B.P. Tripathy, Advocate
…
For the 1st Party-Management.
M/s. B.C. Bastia, Advocate
…
For the 2nd Party-Workman
AWARD
The Government of India in the Ministry of Labour in exercise its authority conferred by clause (d) of Sub-section
(1) and sub-section (2A) of Section 10 of the Industrial Disputes Act, 1047 (herein-after referred to as “The Act”) have
referred for an adjudication of a dispute under the Act vide its Leter No. L-29012/3/2002-IR(M), dated 11.07.2002 and
the schedule of reference is “Whether the action of the management of Daitari Iron Ore Project of M/s. OMC Ltd., in
terminating the service of Shri Biranchi Prasad Jena justified? If not, to what relief the workman is entitled?”
2.
Shorn of unnecessary details the case of the disputant workman is that he was engaged by the 1st Party-
Management as a gardener on daily wage basis for the period from 28.9.1995 to 31.7.2001 to maintain the garden of the
guest house and children park at Daitari. That apart, he was to work in the residential bunglow of the General Manager.
In such process of engagement he worked continuously and uninterruptedly for more than 240 days in a calendar year.
Though, he used to work daily through-out the month to maintain the garden he was paid wages for less number of days
in a month than the actual days of work as wages on Sundays and other public holidays were not paid to him. He was
provided with a quarters belonging to the Management. Provident fund and E.S.I. contribution was deducted from his
wages and deposited by the Management. It is his claim that having worked for more than five years on daily wage basis
when he approached the Management for regularization of his service, the Management refused employment to him with
effect from 01.08.2001. Such a refusal of employment amounts to retrenchment. He was not paid notice pay and
retrenchment compensation when engagement was refused to him. As his engagement was continuous and uninterrupted
for more than 240 days in a twelve calendar months preceding to his disengagement and there was non-compliance of the
provisions of Section 25-F of the Act, such refusal of employment/retrenchment is illegal, unjustified and unsustainable
in the eye of law. Hence, a dispute was raised before the Asst. Labour Commissioner (Central), which ultimately leads to
the present reference.
3.
In its written statement the Management has refuted the allegations denying all pleadings of the disputant
workman. Per contra it is the stand of the Management that the disputant was engaged as a contingent labour on
exigencies and his such engagement was occasional and intermittent. He was never engaged for full month and his
employment was not exceeded 240 days continuously in any calendar year during the period of his engagement. Since,
his engagement was purely on temporary and on need basis and it was in nature of casual daily labour for a period of
much less than 240 days in a year, there was no statutory requirements to comply the provisions of Section 25-F of the
Act while refusing engagement to a daily labour like him. It is, further, stand of the Management that when as a matter of
principle the work of gardening in the guest house and the children park was out-sourced through contractor, there was
no necessity for the Management to engage the disputant on daily wage basis. Since, such gardening in the guest house
and the children park is being out-sourced presently, there is also no scope for reinstatement or reengagement of the
disputant workman. Hence, prayer has been made for rejection of the claim statement.
4.
On the aforesaid pleadings of the parties the following issues have been settled for adjudication of the dispute.
ISSUES
1.
Whether the reference is maintainable?
2.
Whether the action of the Management of Daitari Iron Ore Project of M/s. OMC Limited in terminating the
service of Shri Biranchi Prasad Jena is justified?
3.
If not to what relief the workman is entitled?
5.
It is pertinent to mention here that the reference case was disposed of by this Tribunal vide its award dated
29.4.2005 whereby the claim of the disputant workman was rejected on the ground that he had not worked continuously
for 240 days preceding to his disengagement. The workman filed a writ petition before the Hon’ble High Court of Orissa
vide W.P.(C) No. 9621/2005 challenging the award. The Hon’ble High Court while disposing the writ vide its order
5050
THE GAZETTE OF INDIA : AUGUST 11, 2018/SRAVANA 20, 1940
[PART II—SEC. 3(ii)]
dated 22.3.2017 have set aside the impugned award and remitted back the matter to the Tribunal for its fresh adjudication
giving opportunity to the parties to adduce further evidence, if any, in the matter. The observation made by the Hon’ble
High Court in the order relevant for the purpose of fresh disposal is as follows:- “Taking into consideration the
submission made by the learned counsel for the parties and on perusal of the impugned award under Annexure-4,
it appears that learned CGIT discussing the materials available on record in threadbare disbelieved the
contention of the Workman petitioner to the effect that he had complete 240 days in a calendar year preceding his
termination. Learned CGIT mainly relied upon the wage register pertaining to Workman-petition and came to
the conclusion that the Workman-petitioner had not completed 240 days. He has not referred to any document
reflecting the attendance of the Workman-Petitioner. In that view of the matter, the impugned award under
Annexure-4 is set aside and the matter is remitted back to the learned CGIT for fresh adjudication of the
reference, giving opportunity to the parties to adduce further evidence in the matter”.
6.
In order to substantiate its claim the disputant workman has examined himself as W.W.-1 and he has relied upon
documents like application dated 18.8.2001 of the workman to the G.M. Daitari Iron Ore Project for re-engagement as
Mali, copy of the letter of G.M., Daitari Iron Ore Project dated 16.10.2001 addressed to the A.L.C.(C), Bhubaneswar,
copy of the year-wise working statement of the Dy. Manager (L.W.), Daitari Iron Ore Project, copies of E.P.F. slips of
the workman for different years, copy of the office order dated 6.6.1997 issued by the G.M. (P & A) OMC Limited and
copy of the certificate issued to the workman by Shri B.C. Das, Manager (Admn.) Daitari Iron Ore Mines of M/s. OMC
Limited, dated 31.7.1998 marked as Ext.-1 to Ext.-5. He has not adduced any further evidence after remand of the
matter. The Management did not adduce any evidence before the Tribunal before remand of the matter by the Hon’ble
High Court. But, the Management has examined its Senior Manager, Personnel as M.W.-1 and filed copy of the claim
application of the 2nd party dated 16.10.2001, copy of the written statement dated 16.10.2001 filed by the 1st Party-
Management before the Asst. Labour Commissioner (Central), Bhubaneswar, copy of the work order/letter dated
8.8.2002 of the 1st Party and copy of the agreement between the 1st Party and the contract agency dated 10.12.2002 which
are marked as Ext.-A to Ext.-D after the matter was remitted back to the Tribunal.
7.
All the issues are taken up jointly for the purpose of convenience.
It is well settled by the Hon’ble Apex Court in a catena of decisions including in the case of Krishna Bhagya Jala
Nigam Ltd., -versus- Mohammed Rafi Civil Appeal No. 2895/2009 that the burden of proof is on the claimant to show
that he had worked for 240 days in a given year. This burden is discharged only upon the workman adducing cogent
evidence, both oral and documentary. In cases of termination of services of daily wage earner, there will be no letter of
appointment or termination. There will also no receipt or proof of payment. Thus, in most cases the workman can only
call upon the employer to produce before the court the nominal muster roll for the given period, the letter of appointment
or termination, if any, the wage register, the attendance register etc. Drawing of adverse inference ultimately would
depend thereafter on facts of each case. Mere affidavits or self serving statements made by the claimant/workman will
not suffice in the matter of discharge of the burden placed by law on the workman to prove that he had worked for 240
days in a given year. Keeping in view the above settled position of law if the evidence adduced by the workman is
scrutinized it is found that the disputant has not only relied upon his own assertion/self serving statements but he has also
relied upon a letter issued by the Management to Asst. Labour Commissioner (Central) Ext.-2, copy of year-wise
working statement prepared by the Deputy Manager (LW), Daitari marked as Ext.-2/1 and E.P.F. Accounts slips marked
Ext.-3 series. In his oral testimony the disputant has categorically asserted that he joined as a Mali on daily wage basis in
the service in Daitary Iron Ore Project of the Management on 28.9.1995 by a verbal order of the General Manager. There
is nothing unusual in such statement to disbelieve him since, usually no appointment or written order is issued any
organization for engagement of a daily labour. That apart, the Management has not denied the engagement of the
disputant on a casual and daily wage basis. It is his specific stand that the workman had not completed 240 days
continuous and uninterrupted work in a twelve calendar months preceding to his disengagement. Indisputedly, documents
relied upon by the workman were admitted without objection of the Management. Moreover, these documents are the
copies of official correspondences of the Management. On a mere reading of Ext.-2 it is found that the Management had
admitted before the Asst. Labour Commissioner (Central) that the disputant was paid full and final payment for actual
days of his engagement i.e. for the period from 28.09.1995 to 31.07.2001. As per the wage statement prepared by Deputy
Manager (LW) Daitary Ext.-2/1 the disputant was found to have worked for 145 days in between January, 2001 to July,
2001 and in between January, 2000 to December, 2000 he worked for 240 days. It emerges from the pleadings and
evidence of W.W.-1 that the disputant was not paid wages on the days he was not engaged. As per own assertion of the
disputant he was not paid wages on Sundays and other public holidays. This assertion is not specifically denied by the
Management either in its pleadings or in its evidence. If Sundays and other public holidays in which the disputant was
not paid wages are taken into consideration along with the fact emerging from Ext.-2/1 that the workman had worked for
145 days in between 1st January, to 31st July 2001 and 240 days in between 1st January, to 31st December, 2000, it can be
safely held that the workman was in continuous and uninterrupted service of the Management as defined under section
25-B of the Act.
8.
Further, it cannot be over-sighted that in case of a labour being engaged intermittently or occasionally on
exigencies on daily wage basis there was no need on the part of the employer to deduct or to pay employees provident
¹Hkkx IIµ[k.M 3(ii)º
Hkkjr dk jkti=k % vxLr 11] [email protected] 20] 1940
5051
fund contribution. Ext.-3 series discloses that the Management was making payment of provident fund contribution for
the disputant during the period of his engagement. If the disputant was not engaged casually or on daily wage basis
regularly for a continuous period, the Management was not expected to make payment of E.P.F. contribution. For the
discussions made above, the evidence adduced by the disputant workman is found sufficient to discharge his burden to
prove his continuous engagement of 240 days in a year. That apart, nothing substantial has been elicited from his cross
examination to disbelieve his claim that he worked for 240 days continuously in a twelve calendar months preceding to
his disengagement. When there is overwhelming evidence to suggest the continuous engagement of the disputant for
more than 240 days, the burden shifts to the Management to establish the contrary. But, the Management appears to have
failed miserably in this regard as the oral testimony as well as documents led by the Management after remand of the
case is no way helpful for the Tribunal to discard the claim of the disputant workman. It cannot be over-sighted that
M.W.-1 has categorically admitted that he was not in the service of the Management when the disputant was engaged and
disengaged and his testimoney is based on official records. If the attendance of the workman was less than 240 days in a
year, the Management could have produced the attendance register or wage register or any other connecting paper in
regard to engagement and payment of wages to the disputant from which the actual days of engagement in a calendar
year could have been ascertained. M.W.-1 has admitted that attendance register of casual workers was maintained earlier.
Be that as it may, the Management could have produced the register to prove the disputant wrong. In the above back-
drops adverse inference can be drawn against the claim of the Management. Hence, from the discussions made above it
can be safely said that the disputant workman was engaged on daily wage basis by the Management and his such
engagement on daily wage was more than 240 days continuously in a twelve months calendar year preceding to the
refusal of employment to him on 01.8.2001.
9.
Admittedly, there is no controversy that the disputant was not paid any notice pay and retrenchment compensation
when he was allegedly refused engagement as a daily wager on 01.08.2001. Refusal of employment to the disputant can
also be safely inferred from the pleadings of the Management that garden work in the guest house and in the children
park has been out-sourced from the year 2002. Therefore, the action of the Management not giving further employment
to the disputant after 31.7.2001 would amount to retrenchment as defined under section 2(oo). Such retrenchment was
given effective without payment of notice pay and retrenchment compensation and as such, it was in violation of the
provisions of Section 25-F. Hence, the said retrenchment of the disputant is not tenable in the eye of law.
10.
Coming to the point of relief to which the disputant is entitled, it cannot be over-looked that as per settled
principles of the Hon’ble Apex Court reinstatement is not automatic in cases of all illegal retrenchment or removal.
Relief of reinstatement with back wages depends upon the facts and circumstances of each case. Compensation in lieu of
reinstatement can be awarded depending upon the nature and period of employment held by the workman, facts and
circumstances under which the workman was retrenched or removed and availability of the posts/vacancy and several
other factors. In the case at hand it is seen that the disputant worked only for six years as a casual daily wager. The
disputant was not engaged against any sanctioned and permanent post. He was employed as a contingent labour. In the
meanwhile sixteen/seventeen years have already been elapsed from the date of his alleged retrenchment. The gardening
work is presently out-sourced by the Management and as such there is little scope for the Management to engage the
disputant in such gardening work on daily wage basis. Taking the above factors into consideration I am of the
considered view that it is not a fit case where reinstatement with back wages is the appropriate relief. Award of
compensation seems to be just and appropriate in the case for illegal and unjustified retrenchment of the disputant
workman. Hence, having regard to the length of the period for which the disputant was engaged and other factors the 1st
Party-Management is directed to make a payment of Rs. 1,00,000/- (one lakh only) as compensation to the disputant
workman for his alleged retrenchment. The amount of compensation is to be paid within two months of the publication
of the award failing which the disputant workman is entitled to receive the said compensation with a simple interest of
8% from the date of this order till payment of the compensation.
11.
The reference is answered accordingly.
Dictated & Corrected by me.
B. C. RATH, Presiding Officer
ubZ fnYyh] 1 vxLr] 2018
dk-vk- 1174-—vkS|ksfxd fookn vf/fu;e] 1947 (1947 dk 14) dh èkkjk 17 ds vuqlj.k esa dsUnzh; ljdkj eSllZ
Hkkjrh; thou chek fuxe ds çcaèkra=k ds lac¼ fu;kstdksa vkSj muds deZdkjksa ds chp] vuqcaèk esa fu£n"V vkS|ksfxd fookn esa dsUnzh;
ljdkj vkS|ksfxd vfèkdj.k ,oa Je U;k;ky;] y[kuÅ ds iapkV (lanHkZ la[;k 18@2007) dks çdkf'kr djrh gS] tks dsUnzh; ljdkj dks
27-07-2018 dks çkIr gqvk FkkA
¹la- ,y&17012@2@2007&vkbZvkj (,e)º
Mh- ds- fgeka'kq] voj lfpo
5052
THE GAZETTE OF INDIA : AUGUST 11, 2018/SRAVANA 20, 1940
[PART II—SEC. 3(ii)]
New Delhi, the 1st August, 2018
S.O. 1174.—In pursuance of Section 17 of the Industrial Disputes Act, 1947 (14 of 1947), the Central
Government hereby publishes the Award (Ref. No. 18/2007) of the Central Government Industrial Tribunal/Labour
Court, Lucknow now as shown in the Annexure, in the industrial dispute between the employers in relation to the
management of M/s. Life Insurance Corporation of India and their workman, which was received by the Central
Government on 27.07.2018.
[No. L-17012/2/2007-IR (M)]
D. K. HIMANSHU, Under Secy.
ANNEXURE
CENTRAL GOVERNMENT INDUSTRIAL TRIBUNAL-CUM-LABOUR COURT, LUCKNOW
PRESENT :
RAKESH KUMAR, Presiding Officer
I.D. No. 18/2007
BETWEEN :
Sri Dilip Kumar Gaur
S/o Sri Prabhu Ram Gaur, Village Johardih,
Post and City, Ambedkarpur
Distt. Ambedkar Nagar (UP)
AND
1.
The Branch Manager,
Branch Office, Ambedkar Nagar
Ambedkar Nagar (U.P.)
2.
The Senior Divisional Manager,
Life Insurance Corporation of India,
Divisional Office, L.I.C. Building, Mall Road,
Kanpur (U.P.)
AWARD
1
By order No. L-17012/2/2007-IR(M) dated 14.05.2007 the Central Government in the Ministry of Labour,
New Delhi in exercise of powers conferred by clause (d) of sub section (1) and sub section (2A) of Section 10
of the Industrial Disputes Act, 1947 (14 of 1947) referred this industrial dispute between Sri Dilip Kumar
Gaur S/o Sri Prabhu Ram Gaur, Ambedkarpur and the Branch Manager/Sr.Divisional Manager, LIC,
Ambedkarnagar/Kanpur for adjudication.
2.
The reference under adjudication is:
“WHETHER THE TERMINATION OF SH. DILIP KUMAR GAUR W.E.F. 8.02.1998 A CONTRACT
WORKMAN APPOINTED AS SUBSTAFF/PEON AT THE BRANCH OFFICE OF LIC, AKARPUR,
DISTT. AMBEDKAR NAGAR IS JUST AND LEGAL? IF NOT, TO WHAT RELIEF THE
WORKMAN IS ENTITLED TO?”
3.
As per the Claim statement W-5 dated 10.08.2007, the workman while referring to the dispute sent by the
Govt. of India to this Tribunal, has stated in brief that he was appointed on the post of Peon initially vide
order dated 14.08.1991, by the Branch Manager, after an interview conducted before the Selection
Committee, for a fixed period; again after the termination of the period, he was appointed on the same
conditions vide order dated 28.09.1991, and he continued on the aforesaid post upto 04.11.1991 and payment
was made regularly. The petitioner further stated that he was allowed to continue in service with due wages,
w.e.f. 05.11.1991 but no fresh appointment order was passed and when he enquired regarding his status he
was told that since his working was good, therefore he had been allowed to continue further without giving
any appointment letter.
4.
It has been pleaded in the claim statement that the petitioner was informed for being taken into service as per
Rules of the LIC and therefore he was treated regular on his own and no further appointment letter was
required, due wages were paid to him through the vouchers and apart from doing the duties of the Peon, the
¹Hkkx IIµ[k.M 3(ii)º
Hkkjr dk jkti=k % vxLr 11] [email protected] 20] 1940
5053
opposite party has also directed to him to do the work of Cash book, receipts and cheques in his own hand
writing in the Akbarpur Branch of the LIC, entries on the bank reconciliation statements and receipts etc.
were also made by the petitioner, on some occasions. When his wages were reduced, he moved an application
and then accordingly payment was made to him. It has been alleged by the workman that he had continuously
worked in the Akbarpur branch of LIC from 04.08.1991 to 08.02.1998, without break and he had even
worked on Sundays.
5.
The petitioner has further stated that in July 1997 theft took place in the branch office, on being asked by the
SHO of Police Station the Branch Manager submitted the list dated 17.07.1997 of employees of the LIC
branch, wherein his name was placed at sl.no.2, which clearly indicated that he had been working there as
daily wager for the past six years continuously. Since the petitioner was apprehensive and anxious of his
status, he had regularly asked whether he would be regularized, then he was informed that his case of
regularization shall be considered by the LIC as per its Rules. On 05.02.1998 the petitioner sent
representation to the opposite party through registered post stating therein that he had regularly worked for the
past 7 years and he should be considered for regularization. But when he went to the office as usual on
08.02.1998, he was directed by the Branch Manager, to leave the premises immediately as his services were
terminated and despite his request, no written order of termination was given, he sent representation through
letter dated 02.03.1998 but did not get any response. It has been alleged by the petitioner that no prior notice
was given, neither any compensation was paid; his services were terminated in an arbitrary and unjust
manner, violation of Section 25F of the I.D. Act. has also been pleaded in the claim statement. The workman
has submitted that he never misbehaved, nor any notice/warning was ever issued to him throughout his entire
service at Akbarpur branch of LIC, he has also claimed that LIC is covered under the definition of “Industry”
and his case comes within the definition of “workman” as per the provisions of the I.D. Act. The petitioner
has emphasized that since his date of oral termination viz. from 08.02.1998 he is unemployed. Moreover new
incumbents were recruited by the opposite party management for the same work which was being done by
the petitioner but his case was not considered. He has filed Writ Petition 1755 (S/S) of 1998 before Hon’ble
High Court, Lucknow Bench, Lucknow which was decided on 18.04.2006 thereby giving direction to him to
move an application before the Labour Court. With the aforesaid pleadings request has made by the petitioner
seeking directions to the management to get him reinstated with full back wages and consequential benefits.
Several documents have been annexed with the claim statement.
6.
The management in its written statement M-16, while denying the allegations leveled in the claim statement
admitted that the petitioner was initially appointed on the post of Substaff (Peon) on temporary basis for 40
days only vide appointment letter dated 14.08.1991, for a fixed period on contract basis and his services came
to an end automatically on the expiry of the fixed period. Opposite party has further submitted that his
appointment was extended for further period of 35 days w.e.f. 01.10.1991 and salary was paid for the specific
period to which he was appointed, and his services were not continued after 04.11.1991 and no work was
taken from him thereafter.
7.
The opposite party has pleaded that as per Rules, appointment is made after competitive examination at State
level through the written examination and thereafter interview is also conducted of the eligible persons. No
examination was ever conducted with regard to the said branch of the LIC and as per the Stop Gap
Arrangement on temporary basis, the LIC is empowered to make temporary appointment for particular branch
after requisitioning names from the Employment Exchange and holding test of formal nature. The
management has asserted that the petitioner had worked as temporary Sub Staff (Peon) w.e.f. 12.08.1991 to
23.09.1991, and from 01.10.1991 to 04.11.1991 for a fixed period of 75 days only and thereafter he
automatically stood terminated and did not work as an employee of LIC. The facts mentioned in the claim
statement have been misconceived and false, as per the pleading of the management. The representation of the
petitioner was decided by the management and he was informed through letter dated 13.04.1998. Since on
08.02.1998 he was not working as an employee of the LIC, no question of his termination arose at all. The
opposite party has asserted that the provision of the Constitution of India prevails over the I.D. Act. It has also
been emphasized that the judgment of Hon’ble High Court did not mean that the reference is to be made, only
an option was made to the petitioner to apply under the I.D. Act. Citations of Hon’ble Supreme Court has also
been referred in the written statement.
8.
The opposite party has further asserted that continuance in service for more than 240 days in the public
corporate body will not apply to this case, and it applies to other private industries, for which law was enacted
and since mode of recruitment and appointment is provided in the LIC Rules, the provisions of the I.D. Act.
are not attracted at all. With the above mentioned averments request has been made by the management to
adjudicate the matter against the petitioner workman. Appointment Rules etc. have been annexed with the
written statement.
5054
THE GAZETTE OF INDIA : AUGUST 11, 2018/SRAVANA 20, 1940
[PART II—SEC. 3(ii)]
9.
With strong denial of the allegations made in the written statement, rejoinder W-17 dated 21.08.2009 has
been filed by the petitioner alongwith annexures reiterating the pleas taken in the claim statement.
10.
The petitioner has filed his affidavit W-20, in evidence. He was thoroughly cross examined on behalf of the
management.
11.
The management filed an affidavit M-23 dated 01.06.2011 of Sri S.K. Gupta, Asstt. Administrative Officer,
LIC.
12.
During pendency of the case the petitioner has filed an affidavit dated 28.07.2013, mentioning therein the
directions of the Hon’ble Supreme Court alongwith an application W-30. Another affidavit W-31 alongwith
annexures was also filed by the workman referring therein the order passed by the Hon’ble Supreme Court.
13.
Vide order passed by the then Hon’ble Judge/PO dt. 13.11.2013, amendment application moved by the
workman was allowed and an opportunity was given to the management to file additional written statement
thereafter. On 28.10.2015 the management informed in writing that no additional written statement would be
filed. Thereafter the case was fixed for further orders and evidence. Several adjournment applications were
moved by the workman, seeking time to file his further evidence. But neither any evidence was filed nor
workman/AR thought it proper to appear before this Court on the date fixed. On subsequent dates, further
opportunity was provided to the workman but since he refrained himself to adduce any evidence, the
management was required to submit its evidence on affidavit. On 05.12.2017 again none appeared on behalf
of the workman, the opposite made an endorsement on the Order Sheet that no further evidence would be
adduced by the management. Thereafter the case was fixed for arguments. Following his careless and callous
attitude, again neither the workman appeared to submit arguments nor any AR on his behalf put his
appearance on the date fixed.
14.
Under the circumstances mentioned hereinabove, the intellect arguments on behalf of the management/LIC
were heard at length. Record was scanned thoroughly.
15.
The workman in his cross examination dated 07.04.2011, while replying to a question put up by the
management has submitted that on 14.08.1991 he was appointed for 35 days. Further regarding subsequent
periods commencing w.e.f. 12.08.1991 and 01.10.1991 he did not answer properly, rather in evasive manner
he informed the Court that he had forgotten the relevant period. Again regarding termination of service on
04.11.1991, he has adopted the same tactics. However, he has admitted his request made in the paper no.
7/12, 7/13 and 7/15 wherein prayer was made by him for payment of wages. He has further admitted the fact
of theft at the LIC branch office.
16.
The witness adduced by the management was not cross-examined on behalf of the workman, although
sufficient opportunity was given to him. Further the reference submitted by the workman relating to certain
orders/judgments filed by Hon’ble Courts do not support the version taken by the petitioner in the present
dispute. It is quite evident from the record that the conduct of the petitioner has been very negligent and
careless. For years and months all together the workman did not care to appear before the Court or to move
adjournment application.
17.
The management has referred the case law 2011 (29) LCD, Rizwanullah Ansaari Vs State of U.P. and others,
page 1984, Hon’ble High Court, Allahabad.
18.
In Surenderanagar Panchayat and another v. Jethabhai Pitamberbhai 2005 (107) FLR 1145 (SC) Hon’ble
Apex Court came to the conclusion that the workman could be entitled for the protection of section 25-F of
the I.D. Act., 1947 provided he is successful in establishing the fact that he had been in employment with the
employer for a period of 240 days uninterruptedly. It was held by the Hon’ble Supreme Court that in such
cases, the scope of the enquiry before the Labour Court was confined only to 12 months preceding the date of
termination to decide the question of the continuous service for the purpose of Section 25-F of the I.D. Act.
1947. Further, Hon’ble Apex Court has observed as under:
“ The claimant, apart his oral evidence has not produced any proof in the form of receipt of salary or
wages for 240 days or record of his appointment or engagement for that year to show that he has
worked with the employer for 240 days to get the benefit under section 25-F of the I.D. Act. It is now
well settled that it is for 240 days in a year preceding his termination.”
The workman has pleaded that his services have been terminated orally w.e.f. 08.02.1998 without complying
with the provisions of 25-F of the Act. therefore, the period for scrutiny, in view of the above law, i.e. twelve
calendar months preceding the date of his alleged termination, comes out to from 08.02.1997 to 07.02.1998.
19.
It is well settled that if a party challenges the legality of an order, the burden lies upon him to prove illegality
of the order and if no evidence is produced, the party invoking jurisdiction of the court must fail. In the
present case burden was on the workman to set out the grounds to challenge the validity of the oral
¹Hkkx IIµ[k.M 3(ii)º
Hkkjr dk jkti=k % vxLr 11] [email protected] 20] 1940
5055
termination order and to prove that the termination order was illegal. It was the case of the workman that he
had worked for more than 240 days in the year concerned. The claim has been denied by the management,
therefore, it was for the workman to lead evidence to show that he had in fact worked up to 240 days in the
year preceding his alleged termination. In Range Forest Officer vs S.T. Hadimani (2002) 3 SCC 25 Hon’ble
Apex Court has observed as under:
“It was the case of the claimant that he had so worked but this claim was denied by the appellant. It
was then for the claimant to lead evidence to show that he had in fact worked for 240 days in the year
preceding his termination. Filing of an affidavit is only his own statement in his favour and that can not
be regarded as sufficient evidence for any court or tribunal to come to the conclusion that a workman
had, in fact, worked for 240 days or order or record of appointment or engagement for that period was
produced by the workman. On this ground alone, the award is liable to be set aside.”
20.
Analyzing its earlier decisions on the aforesaid point Hon’ble Apex Court has observed in R.M.Yellatti &
Asstt. Executive Engineer 2006 (108) FLR 213 as follow:
“ It is clear that the provisions of the evidence Act in terms do not apply to the proceedings under
section 10 of the I.D. Act. However, applying general principles and on reading the aforestated
judgments we find that this Court has repeatedly taken the view that the burden of proof is on the
claimant to show that he had worked 240 days in a given year. This burden is discharged only upon the
workman stepping in the witness box. This burden is discharged upon the workman adducing cogent
evidence, both oral and documentary. In cases of termination of services of daily wages earner, there
will be no letter of appointment or termination. There will also be no receipt or proof of payment.
Thus, in most cases, the workman (claimant) can only call upon the empoyer to produce before the
Court the nominal muster roll for the given period, the letter of appointment or termination, if any, the
wage register, the attendance register etc. Drawing of adverse inference ultimately would depend
thereafter on facts of each case. The above decisions however made it clear that mere affidavits or self
serving statements made by the claimant/workman will not suffice in the matter of discharge of the
burden placed by law on the workman to prove that he had worked for 240 days in a given year. The
above judgments further lay down that mere non production of muster rolls per se without any plea of
suppression by the claimant workman will not be the ground for the tribunal to draw an adverse
inference against the management.”
21.
There is no other cogent reason on record except the claim statement and evidence of the workman himself
which could show that the workman was in employment with the LIC, and he had worked continuously for
240 days in 12 calender months preceding the date 08.02.98 and his services have been terminated in utter
violation to the provision of the I.D. Act.
22.
After analyzing the record available before the court, it is inferred that the workman was temporarily in
services of the LIC for certain fixed period, and was paid for the same. On the contrary the management has
successfully proved the stand taken in the written statement. Moreover it is settled law that mere pleading are
no substitute proof. The workman has miserably failed to discharge the burden for establishing the fact of
continuous work for 240 days in the year preceding the date of his alleged termination. Hence I come to the
conclusion that the so called termination of the workman Sri Dilip Kumar Gaur w.e.f. 08.02.1998 can not be
treated as unjust or illegal. The petitioner workman is not entitled to any relief. The reference under
consideration is adjudicated accordingly.
23.
Award as above.
LUCKNOW
25.06. 2018
RAKESH KUMAR, Presiding Officer
ubZ fnYyh] 1 vxLr] 2018
dk-vk- 1175-—vkS|ksfxd fookn vf/fu;e] 1947 (1947 dk 14) dh èkkjk 17 ds vuqlj.k esa dsUnzh; ljdkj eSllZ
Hkkjrh; thou chek fuxe ds çcaèkra=k ds lac¼ fu;kstdksa vkSj muds deZdkjksa ds chp] vuqcaèk esa fu£n"V vkS|ksfxd fookn esa dsUnzh;
ljdkj vkS|ksfxd vfèkdj.k ,oa Je U;k;ky;] gSnjkckn ds iapkV (lanHkZ la[;k 208@2014) dks çdkf'kr djrh gS] tks dsUnzh; ljdkj
dks 27-07-2018 dks çkIr gqvk FkkA
¹la- ,y&17012@115@2014&vkbZvkj (,e)º
Mh- ds- fgeka'kq] voj lfpo
5056
THE GAZETTE OF INDIA : AUGUST 11, 2018/SRAVANA 20, 1940
[PART II—SEC. 3(ii)]
New Delhi, the 1st August, 2018
S.O. 1175.—In pursuance of Section 17 of the Industrial Disputes Act, 1947 (14 of 1947), the Central
Government hereby publishes the Award (Ref. No. 208/2014) of the Central Government Industrial Tribunal/Labour
Court, Hyderabad now as shown in the Annexure, in the industrial dispute between the employers in relation to the
management of M/s. Life Insurance Corporation of India and their workman, which was received by the Central
Government on 27.07.2018.
[No. L-17012/115/2014-IR (M)]
D. K. HIMANSHU, Under Secy.
ANNEXURE
BEFORE THE CENTRAL GOVERNMENT INDUSTRIAL TRIBUNAL-CUM-LABOUR COURT AT
HYDERABAD
Present : Sri Muralidhar Pradhan, Presiding Officer
Dated : the 25th day of June, 2018
INDUSTRIAL DISPUTE No. 208/2014
Between :
Sri Md. Israth Ali
H.No.3-1-90,
(P.O. & M), Metpally,
Karimnagar Dist.
Karimnagar (A.P.) – 505325
…Petitioner
AND
1.
The Zonal Manager,
LIC of India, Zonal Office,
Opp. Secretariat, Saifabad,
Hyderabad – 500 004.
2.
Sr. Divl. Manager,
LIC of India, Divl. Office,
Karimnagar,
Karimnagar (A.P.) – 505001.
3.
The Branch Manager,
LIC of India, Metpally Branch,
Metpally, Karimnagar Dist.
Karimnagar (A.P.)
…Respondents
Appearances:
For the Petitioner
:
Party in Person
For the Respondent
:
Sri B.S.R. Murthy, Advocate
A W A R D
The Government of India, Ministry of Labour by its order No. L- 17012/ 115/ 2014-IR(M) dated 3.9.2014
referred the following dispute under section 10(1)(d) of the I.D. Act, 1947 for adjudication to this Tribunal between the
management of Life Insurance Corporation of India and their workman. The reference is,
SCHEDULE
“Whether the action of the management of the Life Insurance Corporation of India, Zonal Office,
Hyderabad/Divisional Office, Karimnagar and Branch Office, Metpally, Karimnagar Dist., in terminating the
services after crossing 240 days continuous service of Sri Md. Israt Ali, Ex. Temp. Substaff of LIC of India,
Metpally Br. w.e.f. 1.2.2013 is justified or not? If not, what relief the applicant is entitled for?”
The reference is numbered in this Tribunal as I.D. No. 208/2014 and notices were issued to the parties concerned.
2.
The case stands posted for filing of claim statement and documents by the Petitioner.
3.
Inspite of repeated calls, the Petitioner did not turn up. Several opportunities have been given to the Petitioner
to attend the court to prosecute his case. But the Petitioner failed to attend this Tribunal which clearly indicates that
¹Hkkx IIµ[k.M 3(ii)º
Hkkjr dk jkti=k % vxLr 11] [email protected] 20] 1940
5057
perhaps the dispute of the Petitioner has already been settled and the Petitioner has got nothing to raise any claim against
the Respondents. Hence, the case of the Petitioner is closed and a ‘No dispute’ award is passed.
Award is passed accordingly. Transmit.
Typed to my dictation by Smt. P. Phani Gowri, Personal Assistant, corrected by me on this the 25th day of June,
2018.
MURALIDHAR PRADHAN, Presiding Officer
ubZ fnYyh] 1 vxLr] 2018
dk-vk- 1176-—vkS|ksfxd fookn vf/fu;e] 1947 (1947 dk 14) dh èkkjk 17 ds vuqlj.k esa dsUnzh; ljdkj eSllZ fodkl
dULVªD'ku ,oa vU; ds çcaèkra=k ds lac¼ fu;kstdksa vkSj muds deZdkjksa ds chp] vuqcaèk esa fu£n"V vkS|ksfxd fookn esa dsUnzh; ljdkj
vkS|ksfxd vfèkdj.k ,oa Je U;k;ky;] ukxiqj ds iapkV (lanHkZ la[;k 28@2012&13) dks çdkf'kr djrh gS] tks dsUnzh; ljdkj dks 27-
07-2018 dks çkIr gqvk FkkA
¹la- ,y&29012@34@2012&vkbZvkj (,e)º
Mh- ds- fgeka'kq] voj lfpo
New Delhi, the 1st August, 2018
S.O. 1176.—In pursuance of Section 17 of the Industrial Disputes Act, 1947 (14 of 1947), the Central
Government hereby publishes the Award (Ref. No. 28/2012-13) of the Central Government Industrial Tribunal/Labour
Court, Nagpur now as shown in the Annexure, in the industrial dispute between the employers in relation to the
management of M/s. Vikas Construction and other and their workman, which was received by the Central Government
on 27.07.2018.
[No. L-29012/34/2012-IR (M)]
D. K. HIMANSHU, Under Secy.
ANNEXURE
BEFORE SHRI S. S. GARG, PRESIDING OFFICER, CGIT-CUM-LABOUR COURT, NAGPUR
Case No. CGIT/NGP/28/2012-13
Date: 12.06.2018
Party No.1(a)
:
M/s Vikas Construction,
Contractor, At Post Awarpur,
Tehsil: Korpana, Distt. Chandrapur
Party No.1(b)
:
The Plant Head,
M/s Ultra Tech Cement Ltd.,
At Post Awarpur, Tehsil: Korpana,
Distt. Chandrapur (M.S.)
Versus
Party No.2
:
Shri Uddhav Sitaram Vaidya,
R/o Bibi, Post: Nanda,
Tehsil : Korpana, Distt. Chandrapur (M.S.)
AWARD
(Dated: 12th June, 2018)
In exercise of the powers conferred by clause (d) of sub-section (1) and sub-section 2(A) of section 10 of
Industrial Disputes Act, 1947 (14 of 1947) (“the Act” in short), the Central Government has referred the Industrial
dispute between the employers, in relation to the management of M/s Vikas Construction and Ultra Tech Cement Ltd.
and their workman, Shri Uddhav Sitaram Vaidya, for adjudication, as per letter No.L-29012/34/2012-IR(M) dated
29.11.2012, with the following schedule:-
“Whether the action of the management of M/s Ultra Tech Cement Limited, Awarpur Cement Works,
Distt. Chandrapur through contractor M/s Vikas Construction in terminating the services verbally of
Shri Uddhav Sitaram Vaidya w.e.f. 18.07.2011 is legal and justified? What relief the workman is
entitled to?”
5058
THE GAZETTE OF INDIA : AUGUST 11, 2018/SRAVANA 20, 1940
[PART II—SEC. 3(ii)]
2.
On receipt of the reference, notices were issued to parties to file claim and written statement and accordingly the
petitioner filed its statement of claim and affidavit and the Party No. 1, management did not file any written statement.
3.
Today i.e. on 12.06.2018, a joint Pursis is filed, in which, they prayed to decide the said reference, as they settled
their dispute out of the Court. Party No. 1 is represented by Advocate, M.R. Pillai and Party No. 2 is represented by
Advocate, A.A. Madiwale. Party No. 2, workman and M/s Vikas Construction are identified by Advocate S.W.
Ambagade. They also filed Xerox copy of the cheque and their identity proof. This appears settlement is legal. Cheque
is already given and the consent of the workman has already taken. Parties did not want any further relief through this
Tribunal.
So, the Pursis for settlement dated 12.06.2018 is allowed. Hence, it is ordered:-
ORDER
The Pursis for settlement of the case is allowed. The case is treated as withdrawn. The reference is
answered in the negative and against the petitioner. The petitioner is not entitled to any relief.
SHYAM SUNDER GARG, Presiding Officer
ubZ fnYyh] 1 vxLr] 2018
dk-vk- 1177-—vkS|ksfxd fookn vf/fu;e] 1947 (1947 dk 14) dh èkkjk 17 ds vuqlj.k esa dsUnzh; ljdkj eSllZ
bf.M;u vkW;y dkiksZjs'ku fyfeVsM ,oa vU; ds çcaèkra=k ds lac¼ fu;kstdksa vkSj muds deZdkjksa ds chp] vuqcaèk esa fu£n"V vkS|ksfxd
fookn esa dsUnzh; ljdkj vkS|ksfxd vfèkdj.k ,oa Je U;k;ky;] ukxiqj ds iapkV (lanHkZ la[;k 11@2017&18) dks çdkf'kr djrh gS] tks
dsUnzh; ljdkj dks 27-07-2018 dks çkIr gqvk FkkA
¹la- ,y&30011@5@2017&vkbZvkj (,e)º
Mh- ds- fgeka'kq] voj lfpo
New Delhi, the 1st August, 2018
S.O. 1177.—In pursuance of Section 17 of the Industrial Disputes Act, 1947 (14 of 1947), the Central
Government hereby publishes the Award (Ref. No. 11/2017-18) of the Central Government Industrial Tribunal/Labour
Court, Nagpur now as shown in the Annexure, in the industrial dispute between the employers in relation to the
management of M/s. Indian Oil Corporation Limited and others and their workman, which was received by the Central
Government on 27.07.2018.
[No. L-30011/5/2017-IR (M)]
D. K. HIMANSHU, Under Secy.
ANNEXURE
BEFORE SHRI S. S. GARG, PRESIDING OFFICER, CGIT-CUM-LABOUR COURT, NAGPUR
Case No.CGIT/NGP/11/2017-18
Date: 12.06.2018
Party No.1(a)
:
The Sr. Plant Manager,
M/s Indian Oil Corporation Limited,
Dhanj Bottling Plant, Dhanaj (Khurd),
State Highway No. 199, Tehsil. Karanja (Lad),
Distt. Washim Maharashtra – 444110
Party No.1(b)
:
The Executive Director,
M/s Indian Oil Corporation Limited,
Maharashtra State Office, Indian Oil
Bhawan, Plot No. 33, G-Block, Bandra-
Kurla Complex, Bandra (East),
Mumbai – 400050
Party No.1(c)
:
M/s Vishal Testing & Services, Contractor,
1/623, PGN Apartments, Muttukadu Road,
Kottivakkam, Chennai – 600041
Party No.1(d)
:
M/s Super Handling Co. Labour & Transport
Contractor, 4-C, Gurukripa Shopping Centre,
¹Hkkx IIµ[k.M 3(ii)º
Hkkjr dk jkti=k % vxLr 11] [email protected] 20] 1940
5059
Ramkaka Road, Chhani, Vaddodara,
Gujarat – 391740
Versus
Party No. 2
:
The Secretary,
Bhartiya Kamgar Sena,
Prafullaban Society,
R.K. Vaidya Road, Dadar (W),
Mumbai – 400028
AWARD
(Dated: 12th June, 2018)
In exercise of the powers conferred by clause (d) of sub-section (1) and sub-section 2(A) of section 10 of
Industrial Disputes Act, 1947 (14 of 1947) (“the Act” in short), the Central Government has referred the industrial
dispute between the employers, in relation to the management of M/s Indian Oil Corporation Limited & 2 contractors and
their union, Bhartiya Kamgar Sena, for adjudication, as per letter No.L-30011/5/2017- (IR(M) dated 05.06.2017, with
the following schedule:-
“Whether the non-employment/termination of employment of Shri Ramdas O. Yadav, Ex-Helper and 18
others (list attached) contract labourers of Indian Oil Corporation Limited, Dhanaj Bottling Plant w.e.f.
13.10.2016 orally during the pendency of the conciliation proceeding and without compliance of section
33, 25-F & 25-H read with section 2(g) of the Industrial Dispute Act, 1947 is legal and justified? If not, to
what relief the contract labourers are entitled?”
2.
On receipt of the reference, the parties were noticed to file their respective statement of claim and written
statement, by registered post with acknowledge due. On 01.09.2017, Shri Vilas D. Raut, advocate filed vakalatnama on
behalf of the management but nobody appeared on behalf of the petitioner. Fresh notice was issued on 03.11.2017 for
the date of 29.11.2017. On 07.06.2018, advocate for the management filed a pursis for closing of the reference. It shows
that, the petitioner as well as his union is not interested to continue the reference. Hence, it is ordered.
ORDER
The reference is answered in the negative and against the petitioner. The petitioner is not entitled to any
relief.
SHYAM SUNDER GARG, Presiding Officer
ubZ fnYyh] 1 vxLr] 2018
dk-vk- 1178-—vkS|ksfxd fookn vf/fu;e] 1947 (1947 dk 14) dh èkkjk 17 ds vuqlj.k esa dsUnzh; ljdkj eSllZ
bf.M;u vkW;y dkiksZjs'ku fyfeVsM ,oa vU; ds çcaèkra=k ds lac¼ fu;kstdksa vkSj muds deZdkjksa ds chp] vuqcaèk esa fu£n"V vkS|ksfxd
fookn esa dsUnzh; ljdkj vkS|ksfxd vfèkdj.k ,oa Je U;k;ky;] ukxiqj ds iapkV (lanHkZ la[;k 09@2017&18) dks çdkf'kr djrh gS] tks
dsUnzh; ljdkj dks 27-07-2018 dks çkIr gqvk FkkA
¹la- ,y&30011@3@2017&vkbZvkj (,e)º
Mh- ds- fgeka'kq] voj lfpo
New Delhi, the 1st August, 2018
S.O. 1178.—In pursuance of Section 17 of the Industrial Disputes Act, 1947 (14 of 1947), the Central
Government hereby publishes the Award (Ref. No. 09/2017-18) of the Central Government Industrial Tribunal/Labour
Court, Nagpur now as shown in the Annexure, in the industrial dispute between the employers in relation to the
management of M/s. Indian Oil Corporation Limited and others and their workman, which was received by the Central
Government on 27.07.2018.
[No. L-30011/3/2017-IR (M)]
D. K. HIMANSHU, Under Secy.
ANNEXURE
BEFORE SHRI S. S. GARG, PRESIDING OFFICER, CGIT-CUM-LABOUR COURT, NAGPUR
Case No.CGIT/NGP/09/2017-18
Date: 12.06.2018
5060
THE GAZETTE OF INDIA : AUGUST 11, 2018/SRAVANA 20, 1940
[PART II—SEC. 3(ii)]
Party No. 1(a)
:
The Sr. Plant Manager,
M/s Indian Oil Corporation Limited,
Dhanj Bottling Plant, Dhanaj (Khurd),
State Highway No. 199, Tehsil. Karanja (Lad),
Distt. Washim Maharashtra – 444110
Party No. 1(b)
:
The Executive Director,
M/s Indian Oil Corporation Limited,
Maharashtra State Office, Indian Oil
Bhawan, Plot No. 33, G-Block, Bandra-
Kurla Complex, Bandra (East),
Mumbai – 400050
Party No. 1(c)
:
M/s Hemali Constructions, Contractor,
Dhotane (BK), Post-Nagpur, Tq. Nandgaon,
Distt. Nashik, Maharashtra – 423104
Party No. 1(d)
:
M/s Vishal Testing & Services, Contractor,
1/623, PGN Apartments, Muttukadu Road,
Kottivakkam, Chennai – 600041
Party No. 1(e)
:
M/s Akshay Agencies, Contractor,
B/21, Shrihari Complex, Sant Tukaram Chauk,
Distt. Akola, Maharashtra
Party No. 1(f)
:
M/s Shree Electricals, Contractor,
11/12, Shree Vastu Colony, Near Ganesh
Mandir, Vevekanand Nagar-2, Manmad,
Nandgaon, Nashik, Maharashtra – 423104
Party No. 1(g)
:
M/s G K Engineering, Contractor,
At/Po – Dhanaj (Khurd), Tal – Karanja (Lad),
Distt. Washsim, Maharashtra – 444110.
Party No. 1(h)
:
M/s Super Handling Co. Labour & Transport
Contractor, 4-C, Gurukripa Shopping Centre,
Ramkaka Road, Chhani, Vaddodara,
Gujarat – 391740.
Versus
Party No. 2
:
The Secretary,
Bhartiya Kamgar Sena,
Prafullaban Society,
R.K. Vaidya Road, Dadar (W),
Mumbai – 400028.
AWARD
(Dated: 12th June, 2018)
In exercise of the powers conferred by clause (d) of sub-section (1) and sub-section 2(A) of section 10 of
Industrial Disputes Act, 1947 (14 of 1947) (“the Act” in short), the Central Government has referred the industrial
dispute between the employers, in relation to the management of M/s Indian Oil Corporation Limited & 6 contractors and
their union, Bhartiya Kamgar Sena, for adjudication, as per letter No.L-30011/3/2017- (IR(M) dated 15.05.2017, with
the following schedule:-
“(i)
Whether Sri Nishant Kishore Tumsare and 73 other contract labourers (List enclosed) employed by
the Indian Oil corporation Limited, Dhanaj Bottling Plant are entitled to bonus in respect of their
period of employment through previous contractors? If yes, to what relief the contract labourers are
entitled including the rate for payment of bonus and compensation for the delayed payment?
(ii)
Whether the management of Indian Oil corporation Limited, Dhanaj Bottling Plant and the
contractors have committed unfair labour practice as prescribed under part-1,Item 1(a), 4(a), 4(f) &
5(b) of the Fifth Schedule, the Industrial Dispute Act, 1947?
(iii)
Whether the non-employment/termination of employment of Sri Nishant Kishore Tumsare,
Devanand Damodar Rout, Vinod Akaram Khandwe and Suresh Wamanrao Ghode, contract
¹Hkkx IIµ[k.M 3(ii)º
Hkkjr dk jkti=k % vxLr 11] [email protected] 20] 1940
5061
labourers of Indian Oil Corporation Limited, Dhanaj Bottling Plant w.e.f. 01.10.2016 orally during
the pendency of the conciliation proceeding and without compliance of section 33, 25-F & 25-H read
with section 2(g) of the Industrial Dispute Act, 1947 is legal and justified? If not, to what relief the
contract labourers are entitled?”
2.
On receipt of the reference, the parties were noticed to file their respective statement of claim and written
statement, by registered post with acknowledge due. On 01.09.2017, Shri Vilas D Raut, advocate filed vakalatnama on
behalf of the management but nobody appeared on behalf of the petitioner. On 03.11.2017, fresh notice was issued in
favour of the petitioner, fixing the date on 29.11.2017, but on that day also, the petitioner as well as their advocate were
absent. On 07.06.2018 also no statement of claim was filed. Advocate for the management was present and filed a
pursis for closing of the reference. It shows that, the petitioner as well as his union is not interested to continue the
reference. Hence, it is ordered.
ORDER
The reference is answered in the negative and against the petitioner. The petitioner is not entitled to any
relief.
SHYAM SUNDER GARG, Presiding Officer
ubZ fnYyh] 1 vxLr] 2018
dk-vk- 1179-—vkS|ksfxd fookn vf/fu;e] 1947 (1947 dk 14) dh èkkjk 17 ds vuqlj.k esa dsUnzh; ljdkj eSllZ
,;jiksVZ vFkkWfjVh vkWiQ bf.M;k ds çcaèkra=k ds lac¼ fu;kstdksa vkSj muds deZdkjksa ds chp] vuqcaèk esa fu£n"V vkS|ksfxd fookn esa
dsUnzh; ljdkj vkS|ksfxd vfèkdj.k ,oa Je U;k;ky; ua- 2] eqEcbZ ds iapkV (lanHkZ la[;k 22@2003) dks çdkf'kr djrh gS] tks dsUnzh;
ljdkj dks 27-07-2018 dks çkIr gqvk FkkA
¹la- ,y&11011@3@2003&vkbZvkj (,e)º
Mh- ds- fgeka'kq] voj lfpo
New Delhi, the 1st August, 2018
S.O. 1179.—In pursuance of Section 17 of the Industrial Disputes Act, 1947 (14 of 1947), the Central
Government hereby publishes the Award (Ref. No. 22/2003) of the Central Government Industrial Tribunal/Labour
Court-2, Mumbai now as shown in the Annexure, in the industrial dispute between the employers in relation to the
management of M/s. Airports Authority of India and their workman, which was received by the Central Government on
27.07.2018.
[No. L-11011/3/2003-IR (M)]
D. K. HIMANSHU, Under Secy.
ANNEXURE
BEFORE THE CENTRAL GOVERNMENT INDUSTRIAL TRIBUNAL NO. 2, MUMBAI
PRESENT : M. V. DESHPANDE, Presiding Officer
REFERENCE NO. CGIT-2/22 of 2003
EMPLOYERS IN RELATION TO THE MANAGEMENT OF
1.
M/S. AIRPORTS AUTHORITY OF INDIA (IAD)
2.
TDI INTERNATIONAL INDIA LTD.
1.
M/s. Airports Authority of India (IAD),
Mumbai Airports,
Mumbai – 400 099.
2.
M/s. TDI International India Ltd.
Terminal A, Santacruz Airports,
Mumbai – 400 099.
AND
THEIR WORKMEN
General Secretary,
Bhartiya Kamgar Sena,
Shivsena Bhavan, Gadkari Chowk,
Dadar, Mumbai – 400 028
5062
THE GAZETTE OF INDIA : AUGUST 11, 2018/SRAVANA 20, 1940
[PART II—SEC. 3(ii)]
APPEARANCES:
FOR THE EMPLOYER
(1)
:
Ms. Geeta Raju, Advocate
i/b. M/s. M.V. Kini & Co.
(2)
:
No Appearance
FOR THE WORKMEN
:
Umesh Nabar
Mumbai, dated the 27th June, 2018.
AWARD
1.
This is reference made by the Central Government in exercise of powers under clause (d) of sub-section (1) and
sub-section (2A) of Section 10 of the Industrial Disputes Act, 1947 vide Government of India, Ministry of Labour &
Employment, New Delhi vide its order No. L-11011/3/2003 – IR (M) dated 01.05.2003. The terms of reference given in
the schedule are as follows :
“Whether the issuance of charter of demand by the Bhartiya Kamgar Sena to the Management of TDI
International is justified and legal ? If yes, to what benefits the workmen are entitled ?“
2.
After the receipt of the reference, both the parties were served with the notices.
3.
As per order at Ex.30 the reference is withdrawn and is disposed off.
4.
On going through Ex.30, it is submitted that on the date the demands have become infructuous and hence
reference is withdrawn.
5.
In view of Ex.30 the reference is withdrawn and hence disposed off.
ORDER
Reference is withdrawn & disposed off.
Date: 27.06.2018
M. V. DESHPANDE, Presiding Officer
ubZ fnYyh] 1 vxLr] 2018
dk-vk- 1180-—vkS|ksfxd fookn vf/fu;e] 1947 (1947 dk 14) dh èkkjk 17 ds vuqlj.k esa dsUnzh; ljdkj eSllZ
vfgY;kckbZ ljnslkbZ] fdykZikys ekbu ds çcaèkra=k ds lac¼ fu;kstdksa vkSj muds deZdkjksa ds chp] vuqcaèk esa fu£n"V vkS|ksfxd fookn esa
dsUnzh; ljdkj vkS|ksfxd vfèkdj.k ,oa Je U;k;ky; ua- 2] eqEcbZ ds iapkV (lanHkZ la[;k 26@2012) dks çdkf'kr djrh gS] tks dsUnzh;
ljdkj dks 27-07-2018 dks çkIr gqvk FkkA
¹la- ,y&29011@31@2012&vkbZvkj (,e)º
Mh- ds- fgeka'kq] voj lfpo
New Delhi, the 1st August, 2018
S.O. 1180.—In pursuance of Section 17 of the Industrial Disputes Act, 1947 (14 of 1947), the Central
Government hereby publishes the Award (Ref. No. 26/2012) of the Central Government Industrial Tribunal/Labour
Court-2, Mumbai now as shown in the Annexure, in the industrial dispute between the employers in relation to the
management of M/s. Ahiliabai Sardesai, Kirlapale Mine and their workman, which was received by the Central
Government on 27.07.2018.
[No. L-29011/31/2012-IR (M)]
D. K. HIMANSHU, Under Secy.
ANNEXURE
BEFORE THE CENTRAL GOVERNMENT INDUSTRIAL TRIBUNAL NO. 2, MUMBAI
PRESENT : M. V. DESHPANDE, Presiding Officer
REFERENCE NO. CGIT-2/26 of 2012
EMPLOYERS IN RELATION TO THE MANAGEMENT OF
M/S. AHILIABAI SARDESAI.
¹Hkkx IIµ[k.M 3(ii)º
Hkkjr dk jkti=k % vxLr 11] [email protected] 20] 1940
5063
The Managing Director,
M/s. Ahiliabai Sardesai,
Kirlapale Mine, SF-I, Navelkar Arcade,
Dr. Atmaram Borkar Road,
Panaji, Goa – 403 301.
AND
THEIR WORKMEN
The General Secretary,
Goa Mine Workers’ Union,
Dr. Mukund Building, 2nd Floor,
Vasco-Da-Gama, Goa.
APPEARANCES:
FOR THE EMPLOYER
:
Mr. P. J. Kamat, Advocate
FOR THE WORKMEN
:
Mr. T. P. Pereira, Advocate
CAMP – GOA - dated the 6th June, 2018
AWARD
1.
This is reference made by the Central Government in exercise of powers under clause (d) of sub-section (1) and
sub-section (2A) of Section 10 of the Industrial Disputes Act, 1947 vide Government of India, Ministry of Labour &
Employment, New Delhi vide its order No. L-29011/3/2011 – IR (M) dated 2.05.2012. The terms of reference given in
the schedule are as follows :
“Whether the action of the management of M/s. Ahiliabai Sardesai, Kirlapale Mine, in retrenching 32 Plant
workers of Benefication Plant w.e.f. 1/6/2011, is legal and justified ? What relief the workmen are entitled to ?”
2.
After the receipt of the reference, both the parties were served with the notices.
3.
Having gone through the Roznama, it appears that concerned workman/union is absent since 3/11/2017. The
Reference was kept for evidence of the concerned workman/union but the concerned workman/union has not filed
affidavit in evidence despite several opportunities were given to them. Union is absent and no steps taken by the Union.
In view of that the union/concerned workman has failed to substantiate the claim by adducing evidence. The Reference is
liable to be rejected and accordingly the Reference is rejected.
ORDER
Reference is rejected.
Date: 06.06.2018
[CAMP – GOA]
M. V. DESHPANDE, Presiding Officer
ubZ fnYyh] 2 vxLr] 2018
dk-vk- 1181-—vkS|ksfxd fookn vf/fu;e] 1947 (1947 dk 14) dh èkkjk 17 ds vuqlj.k esa dsUnzh; ljdkj eSllZ
¯lxkjsuh dksfy;jht daiuh fyfeVsM ds çcaèkra=k ds lac¼ fu;kstdksa vkSj muds deZdkjksa ds chp] vuqcaèk esa fu£n"V vkS|ksfxd fookn esa
dsUnzh; ljdkj vkS|ksfxd vfèkdj.k&lg&Je U;k;ky;] gSnjkckn ds iapkV (lanHkZ la[;k 2@2016) dks çdkf'kr djrh gS] tks dsUnzh;
ljdkj dks 24-07-2018 dks çkIr gqvk FkkA
¹la- ,y&22012@91@2015&vkbZvkj (lh,e&II)º
jktsUæ flag] vuqHkkx vf/dkjh
New Delhi, the 2nd August, 2018
S.O. 1181.—In pursuance of Section 17 of the Industrial Disputes Act, 1947 (14 of 1947), the Central
Government hereby publishes the Award (Ref. No. 2/2016) of the Central Government Industrial Tribunal-cum-Labour
Court, Hyderabad as shown in the Annexure, in the industrial dispute between the management of M/s. Singareni
Collieries Company Ltd., and their workmen, received by the Central Government on 24.07.2018.
[No. L-22012/91/2015-IR (CM-II)]
RAJENDER SINGH, Section Officer
5064
THE GAZETTE OF INDIA : AUGUST 11, 2018/SRAVANA 20, 1940
[PART II—SEC. 3(ii)]
ANNEXURE
BEFORE THE CENTRAL GOVERNMENT INDUSTRIAL TRIBUNAL-CUM-LABOUR COURT AT
HYDERABAD
Present : Sri Muralidhar Pradhan, Presiding Officer
Dated : the 25th day of June, 2018
INDUSTRIAL DISPUTE No. 2/2016
Between :
Sri Bandari Lingaiah,
President, Singareni Collieries Employees
Union (CITU), Qr. No.39-T, Somagudem X Roads,
Somagudem, (via Bellampalli)
Adilabad (Telengana)- 504251
…Petitioner
AND
The General Manager,
M/s. Singareni Collieries Company Ltd.,
Mandamarri Area, Mandamarri (P.O.) -504231.
Adilabad Distt. (Telengana State).
…Respondents
Appearances :
For the Petitioner
:
None
For the Respondent
:
Representative
AWARD
The Government of India, Ministry of Labour by its order No. L- 22012/91/2015-IR(CM-II) dated 23.12.2015
referred the following dispute under section 10(1)(d) of the I.D. Act, 1947 for adjudication to this Tribunal between the
management of M/s. Singareni Collieries Company Ltd., and their workman. The reference is,
SCHEDULE
“Whether the action of the General Manager, M/s. Singareni Collieries Company Ltd., Mandamarri Area,
Adilabad Distt. in terminating the services of Sri T. Haribabu, Ex-Coal Filler, Kasipeta Mine Inc., SCCL,
Mandamarri Area with effect from 7.6.2002 is justified or not? If not, to what relief the applicant is entitled
for?”
The reference is numbered in this Tribunal as I.D. No. 2/2016 and notices were issued to the parties concerned to procure
their attendance.
2.
The case stands posted for filing of claim statement and documents by the Petitioner.
3.
Inspite of repeated calls, the Petitioner Union/workman did not turn up. Several opportunities have been given
to the Petitioner to attend the court to prosecute his case. No claim statement is filed by the Petitioner Union/workman
inspite of taking several adjournments. Non-appearance of the Petitioner Union/workman and non-filing of claim
statement in time, clearly indicates that perhaps the parties have settled their dispute and the Petitioner union/workman
has no claim to raise. Hence, it is not desirable to linger the case to any further date. Thus, the case of the Petitioner
Union/workman is closed and a ‘No dispute’ award is passed.
Award is passed accordingly. Transmit.
Typed to my dictation by Smt. P. Phani Gowri, Personal Assistant, corrected by me on this the 25th day of June,
2018.
MURALIDHAR PRADHAN, Presiding Officer
Appendix of evidence
Witnesses examined for the Petitioner
Witnesses examined for the Respondent
NIL
NIL
Documents marked for the Petitioner
NIL
Documents marked for the Respondent
NIL
¹Hkkx IIµ[k.M 3(ii)º
Hkkjr dk jkti=k % vxLr 11] [email protected] 20] 1940
5065
ubZ fnYyh] 2 vxLr] 2018
dk-vk- 1182-—vkS|ksfxd fookn vf/fu;e] 1947 (1947 dk 14) dh èkkjk 17 ds vuqlj.k esa dsUnzh; ljdkj eSllZ
¯lxkjsuh dksfy;jht daiuh fyfeVsM ds çcaèkra=k ds lac¼ fu;kstdksa vkSj muds deZdkjksa ds chp] vuqcaèk esa fu£n"V vkS|ksfxd fookn esa
dsUnzh; ljdkj vkS|ksfxd vfèkdj.k&lg&Je U;k;ky;] gSnjkckn ds iapkV (lanHkZ la[;k 39@2009) dks çdkf'kr djrh gS] tks dsUnzh;
ljdkj dks 24-07-2018 dks çkIr gqvk FkkA
¹la- ,y&22012@23@2009&vkbZvkj (lh,e&II)º
jktsUæ flag] vuqHkkx vf/dkjh
New Delhi, the 2nd August, 2018
S.O. 1182.—In pursuance of Section 17 of the Industrial Disputes Act, 1947 (14 of 1947), the Central
Government hereby publishes the Award (Ref. No. 39/2009) of the Central Government Industrial Tribunal-cum-Labour
Court, Hyderabad as shown in the Annexure, in the industrial dispute between the management of M/s. Singareni
Collieries Company Ltd., and their workmen, received by the Central Government on 24.07.2018.
[No. L-22012/23/2009-IR (CM-II)]
RAJENDER SINGH, Section Officer
ANNEXURE
BEFORE THE CENTRAL GOVERNMENT INDUSTRIAL TRIBUNAL-CUM-LABOUR COURT AT
HYDERABAD
Present : Sri Muralidhar Pradhan, Presiding Officer
Dated : the 27th day of June, 2018
INDUSTRIAL DISPUTE No. 39/2009
Between :
The General Secretary
(Sri Riyaz Ahmed),
Singareni Miners & Engg. Workers Union(HMS),
Qtr. No.C-34, Sector-I,
Godavarikhani,
Karimnagar – 505209
…Petitioner
AND
The Chief General Manager,
M/s. Singareni Collieries Company Ltd.,
Yellandu Division,
Yellandu (P.O.), Khammam (Dt.)
…Respondents
Appearances :
For the Petitioner
:
M/s. A. Sarojana & K. Vasudeva Reddy, Advocates
For the Respondent
:
M/s. P.A.V.V.S. Sarma & Vijaya Lakshmi Panguluri, Advocates
AWARD
This is a reference issued by the Government of India, Ministry of Labour and Employment, New Delhi vide
order No.L-22012/23/2009-IR[CM-II] dated 28.7.2009 whereunder this Tribunal is required to adjudicate the dispute
i.e.,
“Whether the action of the Management of M/s. Singareni Collieries Company Limited, in imposing penalty of
reducing 5 increments with cumulative effect from 01.07.2007 in respect of Sri A. Rajeswara Rao is legal and
justified? To what relief is the workman concerned entitled?”
After receiving the above said reference, it was registered as ID No.39/2009 in this Tribunal and notices were
issued to both the parties and secured their presence.
5066
THE GAZETTE OF INDIA : AUGUST 11, 2018/SRAVANA 20, 1940
[PART II—SEC. 3(ii)]
2.
Pursuant to the notice, the Petitioner appeared and filed claim statement.
3.
Respondents appeared and filed their counter.
4.
The domestic enquiry conducted in the present case is held as legal and valid vide order dated 30.6.2016.
5.
While the case is posted for arguments, at this stage, the Learned Counsel for the Petitioner workman filed a
memo to withdraw the present case and accordingly, the copy of the memo was served to the Respondent.
6.
In view of the memo filed by the Counsel for the Petitioner Union, the memo is accepted and the case is allowed
to be withdrawn by the Petitioner Union.
The reference is answered accordingly. Transmit.
Typed to my dictation by Smt. P. Phani Gowri, Personal Assistant, and corrected by me on this the 27th day of
June, 2018.
MURALIDHAR PRADHAN, Presiding Officer
Appendix of evidence
Witnesses examined for the Petitioner
Witnesses examined for the Respondent
NIL
NIL
Documents marked for the Petitioner
NIL
Documents marked for the Respondent
NIL
ubZ fnYyh] 2 vxLr] 2018
dk-vk- 1183-—vkS|ksfxd fookn vf/fu;e] 1947 (1947 dk 14) dh èkkjk 17 ds vuqlj.k esa dsUnzh; ljdkj eSllZ
¯lxkjsuh dksfy;jht daiuh fyfeVsM ds çcaèkra=k ds lac¼ fu;kstdksa vkSj muds deZdkjksa ds chp] vuqcaèk esa fu£n"V vkS|ksfxd fookn esa
dsUnzh; ljdkj vkS|ksfxd vfèkdj.k&lg&Je U;k;ky;] gSnjkckn ds iapkV (lanHkZ la[;k 128@2015) dks çdkf'kr djrh gS] tks dsUnzh;
ljdkj dks 24-07-2018 dks çkIr gqvk FkkA
¹la- ,y&22012@80@2015&vkbZvkj (lh,e&II)º
jktsUæ flag] vuqHkkx vf/dkjh
New Delhi, the 2nd August, 2018
S.O. 1183.—In pursuance of Section 17 of the Industrial Disputes Act, 1947 (14 of 1947), the Central
Government hereby publishes the Award (Ref. No. 128/2015) of the Central Government Industrial Tribunal-cum-
Labour Court, Hyderabad as shown in the Annexure, in the industrial dispute between the management of M/s. Singareni
Collieries Company Ltd., and their workmen, received by the Central Government on 24.07.2018.
[No. L-22012/80/2015-IR (CM-II)]
RAJENDER SINGH, Section Officer
ANNEXURE
BEFORE THE CENTRAL GOVERNMENT INDUSTRIAL TRIBUNAL-CUM-LABOUR COURT AT
HYDERABAD
Present : Sri Muralidhar Pradhan, Presiding Officer
Dated : the 25th day of June, 2018
INDUSTRIAL DISPUTE No. 128/2015
Between :
Sri Thopparthi Banaiah,
S/o Ashalu,
H.No.3-41, Kishtampet (V),
¹Hkkx IIµ[k.M 3(ii)º
Hkkjr dk jkti=k % vxLr 11] [email protected] 20] 1940
5067
Chennur (M),
Warangal Distt. 504204
…Petitioner
AND
The General Manager,
M/s. Singareni Collieries Company Ltd.,
Bhupalapalli Area, Bhupalapalli -506 169.
Warangal Distt. (Telengana State)
…Respondents
Appearances :
For the Petitioner
:
None
For the Respondent
:
Sri V.S.V.S.R.K.S. Prasad, Advocate
AWARD
The Government of India, Ministry of Labour by its order No. L- 22012/80/2015-IR(CM-II) dated 26.11.2015
referred the following dispute under section 10(1)(d) of the I.D. Act, 1947 for adjudication to this Tribunal between the
management of M/s. Singareni Collieries Company Ltd., and their workman. The reference is,
SCHEDULE
“Whether the action of the General Manager, M/s. Singareni Collieries Company Ltd., Ramagundam-I Area,
Godavarikhani, Karimnagar Distt., in terminating the services of Sri Thopparthi Banaiah, Ex-Coal Filler, KTK-
2 Inc., SCCL, Bhupalapalli Area with effect from 2.1.2007 is justified or not? If not, to what relief the
applicant is entitled for?”
The reference is numbered in this Tribunal as I.D. No. 128/2015 and notices were issued to the parties concerned.
2.
The case stands posted for filing of claim statement and documents by the Petitioner.
3.
Inspite of repeated calls, the Petitioner did not turn up. Several opportunities have been given to the Petitioner
to attend the court to prosecute his case. No claim statement is filed inspite of taking several adjournments. Non-
appearance of the Petitioner and non-filing of claim statement in time, clearly indicates that perhaps the parties have
settled the dispute and the Petitioner has no claim to raise. Hence, it is not desirable to linger the case to any further date.
Thus, the case of the Petitioner is closed and a ‘No dispute’ award is passed.
Award is passed accordingly. Transmit.
Typed to my dictation by Smt. P. Phani Gowri, Personal Assistant, corrected by me on this the 25th day of June,
2018.
MURALIDHAR PRADHAN, Presiding Officer
Appendix of evidence
Witnesses examined for the Petitioner
Witnesses examined for the Respondent
NIL
NIL
Documents marked for the Petitioner
NIL
Documents marked for the Respondent
NIL
ubZ fnYyh] 2 vxLr] 2018
dk-vk- 1184-—vkS|ksfxd fookn vf/fu;e] 1947 (1947 dk 14) dh èkkjk 17 ds vuqlj.k esa dsUnzh; ljdkj eSllZ
¯lxkjsuh dksfy;jht daiuh fyfeVsM ds çcaèkra=k ds lac¼ fu;kstdksa vkSj muds deZdkjksa ds chp] vuqcaèk esa fu£n"V vkS|ksfxd fookn esa
dsUnzh; ljdkj vkS|ksfxd vfèkdj.k&lg&Je U;k;ky;] gSnjkckn ds iapkV (lanHkZ la[;k 206@2014) dks çdkf'kr djrh gS] tks dsUnzh;
ljdkj dks 24-07-2018 dks çkIr gqvk FkkA
¹la- ,y&22012@52@2014&vkbZvkj (lh,e&II)º
jktsUæ flag] vuqHkkx vf/dkjh
5068
THE GAZETTE OF INDIA : AUGUST 11, 2018/SRAVANA 20, 1940
[PART II—SEC. 3(ii)]
New Delhi, the 2nd August, 2018
S.O. 1184.—In pursuance of Section 17 of the Industrial Disputes Act, 1947 (14 of 1947), the Central
Government hereby publishes the Award (Ref. No. 206/2014) of the Central Government Industrial Tribunal-cum-
Labour Court, Hyderabad as shown in the Annexure, in the industrial dispute between the management of M/s. Singareni
Collieries Company Ltd., and their workmen, received by the Central Government on 24.07.2018.
[No. L-22012/52/2014-IR (CM-II)]
RAJENDER SINGH, Section Officer
ANNEXURE
BEFORE THE CENTRAL GOVERNMENT INDUSTRIAL TRIBUNAL-CUM-LABOUR COURT AT
HYDERABAD
Present : Sri Muralidhar Pradhan, Presiding Officer
Dated : the 29th day of June, 2018
INDUSTRIAL DISPUTE No. 206/2014
Between :
The President,
(Bandari Satyanarayana),
Rashtriya Collieries Mazdoor Sangh (RCMS),
Rajkumar Complex, Saibaba Temple Road,
Jaffar Nagar, Mancherial -504 208.
Adilabad District
…Petitioner
AND
The General Manager,
M/s. Singareni Collieries Company Ltd.,
Sreerampur Area, Sreerampur-504303.
Adilabad District
…Respondents
Appearances :
For the Petitioner
:
None
For the Respondent
:
Representative
AWARD
The Government of India, Ministry of Labour by its order No. L- 22012/52/2014-IR(CM-II) dated 16.9.2014
referred the following dispute under section 10(1)(d) of the I.D. Act, 1947 for adjudication to this Tribunal between the
management of M/s. Singareni Collieries Company Ltd., and their workman. The reference is,
SCHEDULE
“Whether the action of the General Manager, M/s. Singareni Collieries Company Ltd., Sreerampur Area,
Adilabad Distt. in terminating the services of Sri Md. Saheb Hussain, Ex-Coal Filler, IK-1A inc., Sreerampur
Area-with effect from 01.01.2005 is justified or not? If not, to what relief the applicant is entitled for?”
The reference is numbered in this Tribunal as I.D. No. 206/2014 and notices were issued to the parties concerned.
2.
The case stands posted for filing of claim statement and documents by the Petitioner Union.
3.
Inspite of repeated calls, the Petitioner union did not turn up. Several opportunities have been given to the
Petitioner Workman/Union to attend the court to prosecute his case. But the Petitioner workman/union failed to attend
this Tribunal which clearly indicates that perhaps the dispute of the Petitioner workman/union has already been settled
and the Petitioner Union has nothing to raise any claim against the Respondent. Hence, the case of the Petitioner
workman/Union is closed and a ‘No dispute’ award is passed.
Award is passed accordingly. Transmit.
Typed to my dictation by Smt. P. Phani Gowri, Personal Assistant, corrected by me on this the 29th day of June,
2018.
MURALIDHAR PRADHAN, Presiding Officer
¹Hkkx IIµ[k.M 3(ii)º
Hkkjr dk jkti=k % vxLr 11] [email protected] 20] 1940
5069
Appendix of evidence
Witnesses examined for the Petitioner
Witnesses examined for the Respondent
NIL
NIL
Documents marked for the Petitioner
NIL
Documents marked for the Respondent
NIL
ubZ fnYyh] 2 vxLr] 2018
dk-vk- 1185-—vkS|ksfxd fookn vf/fu;e] 1947 (1947 dk 14) dh èkkjk 17 ds vuqlj.k esa dsUnzh; ljdkj eSllZ
¯lxkjsuh dksfy;jht daiuh fyfeVsM ds çcaèkra=k ds lac¼ fu;kstdksa vkSj muds deZdkjksa ds chp] vuqcaèk esa fu£n"V vkS|ksfxd fookn esa
dsUnzh; ljdkj vkS|ksfxd vfèkdj.k&lg&Je U;k;ky;] gSnjkckn ds iapkV (lanHkZ la[;k 207@2014) dks çdkf'kr djrh gS] tks dsUnzh;
ljdkj dks 24-07-2018 dks çkIr gqvk FkkA
¹la- ,y&22012@57@2014&vkbZvkj (lh,e&II)º
jktsUæ flag] vuqHkkx vf/dkjh
New Delhi, the 2nd August, 2018
S.O. 1185.—In pursuance of Section 17 of the Industrial Disputes Act, 1947 (14 of 1947), the Central
Government hereby publishes the Award (Ref. No. 207/2014) of the Central Government Industrial Tribunal-cum-
Labour Court, Hyderabad as shown in the Annexure, in the industrial dispute between the management of M/s. Singareni
Collieries Company Ltd., and their workmen, received by the Central Government on 24.07.2018.
[No. L-22012/57/2014-IR (CM-II)]
RAJENDER SINGH, Section Officer
ANNEXURE
BEFORE THE CENTRAL GOVERNMENT INDUSTRIAL TRIBUNAL-CUM-LABOUR COURT AT
HYDERABAD
Present : Sri Muralidhar Pradhan, Presiding Officer
Dated : the 29th day of June, 2018
INDUSTRIAL DISPUTE No. 207/2014
Between :
The President,
(Bandari Satyanarayana),
Rashtriya Collieries Mazdoor Sangh (RCMS),
Rajkumar Complex, Saibaba Temple Road,
Jaffar Nagar, Mancherial -504 208.
Adilabad District
…Petitioner
AND
The General Manager,
M/s. Singareni Collieries Company Ltd.,
Mandamarri Area, Mandamarri -504231
Adilabad District
…Respondent
Appearances :
For the Petitioner
:
None
For the Respondent
:
Representative
5070
THE GAZETTE OF INDIA : AUGUST 11, 2018/SRAVANA 20, 1940
[PART II—SEC. 3(ii)]
AWARD
The Government of India, Ministry of Labour by its order No. L-22012/57/2014-IR(CM-II) dated 12.9.2014
referred the following dispute under section 10(1)(d) of the I.D. Act, 1947 for adjudication to this Tribunal between the
management of M/s. Singareni Collieries Company Ltd., and their workman. The reference is,
SCHEDULE
“Whether the action of the General Manager, M/s. Singareni Collieries Company Ltd., Mandamarri Area,
Mandamarri Adilabad Distt. in terminating the services of Sri P. Ramulu, Ex-Coal Filler, Shantikhani,
Mandamarri Area with effect from 22.1.2003 is justified or not? If not, to what relief the applicant is entitled
for?”
The reference is numbered in this Tribunal as I.D. No. 207/2014 and notices were issued to the parties concerned.
2.
The case stands posted for filing of claim statement and documents by the Petitioner Union.
3.
Inspite of repeated calls, the Petitioner union did not turn up. Several opportunities have been given to the
Petitioner Workman/Union to attend the court to prosecute his case. But the Petitioner workman/union failed to attend
this Tribunal which clearly indicates that perhaps the dispute of the Petitioner workman/union has already been settled
and the Petitioner Union has nothing to raise any claim against the Respondent. Hence, the case of the Petitioner
workman/Union is closed and a ‘No dispute’ award is passed.
Award is passed accordingly. Transmit.
Typed to my dictation by Smt. P. Phani Gowri, Personal Assistant, corrected by me on this the 29th day of June,
2018.
MURALIDHAR PRADHAN, Presiding Officer
Appendix of evidence
Witnesses examined for the Petitioner
Witnesses examined for the Respondent
NIL
NIL
Documents marked for the Petitioner
NIL
Documents marked for the Respondent
NIL
ubZ fnYyh] 2 vxLr] 2018
dk-vk- 1186-—vkS|ksfxd fookn vf/fu;e] 1947 (1947 dk 14) dh èkkjk 17 ds vuqlj.k esa dsUnzh; ljdkj eSllZ
¯lxkjsuh dksfy;jht daiuh fyfeVsM ds çcaèkra=k ds lac¼ fu;kstdksa vkSj muds deZdkjksa ds chp] vuqcaèk esa fu£n"V vkS|ksfxd fookn esa
dsUnzh; ljdkj vkS|ksfxd vfèkdj.k&lg&Je U;k;ky;] gSnjkckn ds iapkV (lanHkZ la[;k 97@2009) dks çdkf'kr djrh gS] tks dsUnzh;
ljdkj dks 24-07-2018 dks çkIr gqvk FkkA
¹la- ,y&22013@01@2018&vkbZvkj (lh,e&II)º
jktsUæ flag] vuqHkkx vf/dkjh
New Delhi, the 2nd August, 2018
S.O. 1186.—In pursuance of Section 17 of the Industrial Disputes Act, 1947 (14 of 1947), the Central
Government hereby publishes the Award (Ref. No. 97/2009) of the Central Government Industrial Tribunal-cum-Labour
Court, Hyderabad as shown in the Annexure, in the industrial dispute between the management of M/s. Singareni
Collieries Company Ltd., and their workmen, received by the Central Government on 24.07.2018.
[No. L-22013/01/2018-IR (CM-II)]
RAJENDER SINGH, Section Officer
ANNEXURE
BEFORE THE CENTRAL GOVERNMENT INDUSTRIAL TRIBUNAL-CUM-LABOUR COURT AT
HYDERABAD
Present : Sri Muralidhar Pradhan, Presiding Officer
Dated : the 27th day of June, 2018
¹Hkkx IIµ[k.M 3(ii)º
Hkkjr dk jkti=k % vxLr 11] [email protected] 20] 1940
5071
INDUSTRIAL DISPUTE L.C. No. 97/2009
Between :
Sri Koraveni Srinivas,
S/o Chantaiah,
C/o Smt. A. Sarojana, Advocate,
Flat No. G7,Rajeshwari Gayatri Sadan,
Opp: Badruka Jr. College
for Girls, Kachiguda, Hyderabad
…Petitioner
AND
1.
The Director (PA & W),
The Singareni Collieries Company Limited,
Kothagudem, Khammam District.
2.
The Chief General Manager,
Singareni Collieries Company Ltd,
Srirampur Area, Srirampur, Adilabad Dist.
3.
The Superintendent of Mines,
RK-6 Incline, Singareni Collieries Company Ltd.,
Srirampur, Adhlabad Dist.
….Respondents
Appearances :
For the Petitioner
:
M/s. A. Sarojana & K. Vasudeva Reddy, Advocates
For the Respondent
:
M/s. P.A.V.V.S. Sarma & Vijaya Lakshmi Panguluri, Advocates
AWARD
Sri Koraveni Srinivas, who worked as Coal Filler (who will be referred to as the workman) has filed the petition
under Sec. 2A(2) of the Industrial Disputes Act, 1947 against the respondents M/s. Singareni Collieries Company Ltd.,
represented by its employees seeking for declaring the proceeding No.SRP/PER/13.008/980 dated 10.03.2009 issued by
Respondent No.2 as illegal, arbitrary and to set aside the same consequently directing the Respondents to reinstate the
Petitioner into service duly granting all the consequential benefits such as continuity of service, back wages and all other
attendant benefits etc., and such other reliefs as this court may deems fit.
2.
The averments made in the petition in brief are as follows :
The petitioner was given appointment under dependent quota on 25.03.2000 as Badli Filler and he was confirmed as Coal
Filler. While the matter stood thus, charge sheet was issued to him alleging that, he obtained employment by producing
forged documents. The petitioner submitted his reply to the charge sheet denying the charge. While submitting reply, the
petitioner pleaded that he married the daughter of Late Sri Uppuleti Mondi in the year 1997 and he was given
employment in the capacity of son-in-law of Late Sri Uppuleti Mondi. The petitioner pleaded that, in support of his
claim, he submitted the marriage certificate to the competent authority. Thereafter, an enquiry was conducted, wherein,
no witnesses were examined on behalf of the Management, whereas, he examined himself and also examined other three
on his behalf, as Witness DW1 to DW3. But, without considering the evidence on record, the enquiry officer held the
charge as proved. Basing on such report of the enquiry officer, a show cause notice dated 22.10.2008 was issued, to
which, the petitioner submitted his explanation on 04.11.2008. But, without considering the same, impugned proceeding
dated 10.03.2009 was issued dismissing him from service w.e.f. 15.03.2009. The petitioner pleaded that the charge
alleged against the petitioner is wholly illegal and he was dismissed from service arbitrarily after putting nearly 9 years
of service. Though the petitioner approached the respondents to consider his case justifiably, but the Management did
not pay any heed to it. Therefore, the petitioner was constrained to approach this Tribunal to declare the impugned
proceeding No.SRP/PER/13.008/980 dated 10.3.2009 issued by Respondent No.2 as illegal, arbitrary and to set aside the
same consequently directing the Respondents to reinstate the Petitioner into service duly granting all the consequential
benefits such as continuity of service, back wages and all other attendant benefits etc.
3.
The Respondents filed counter denying the averments made in the petition, with the averments in brief
which runs as follows :
In the counter, the Respondents while admitting some of the factual aspects to be true, stated that, the Petitioner was
appointed as Badli Filler under Dependent Employment Scheme on 25.3.2000 as son-in-law of Late Sri Uppuleti Mondi,
Ex-Coal Filler, GDK-3 Incline, who was declared as unfit to work as Coal Filler. The Respondents also pleaded that from
the date of his appointment to the date of his dismissal, the Petitioner is regular to his duties and his attendance, conduct
5072
THE GAZETTE OF INDIA : AUGUST 11, 2018/SRAVANA 20, 1940
[PART II—SEC. 3(ii)]
and work performance were quite satisfactory. The Respondents further contended that, basing on the recommendations
of the Vigilance Department holding that, the Petitioner was not the son-in-law of Late Uppuleti Mondi, Ex-Coal Filler,
GDK-3 Incline, a charge sheet dated 3.10.2005 was issued to him under Company’s Standing Order No.25.1 & 25.10, a
detailed domestic enquiry was conducted and basing on the report submitted by the enquiry officer, a show cause notice
dated 22.10.2008 was issued enclosing the report of the enquiry officer. On receipt of show cause notice, the Petitioner
submitted his representation dated 4.11.2008 and after considering the representation and the record of enquiry. The
Petitioner was dismissed from service w.e.f. 14.3.2009 vide letter dated 10.3.2009. The Respondents contended that, as
the petitioner obtained employment by producing false and fabricated documents, the management was constrained to
initiate the disciplinary proceedings. It is further contended that, the Vigilance Department conducted thorough enquiry
before initiating the disciplinary action. During such enquiry, it is established that Smt.U.Swapna was not the wife of the
petitioner and this factum was even accepted by her mother i.e. U.Gangamma (DW3) in her statement given to the
Vigilance Department and various documents obtained by the Vigilance Department establishes the charge against the
petitioner. The Respondents further contended that, the Petitioner has fully participated in the enquiry and he was given
full and fair opportunity to defend his case. Basing on the material evidence produced by the Presenting Officer and also
oral evidence from the concerned persons before the enquiry officer, charges were established. As such, having
considered the evidence on record, the disciplinary authority imposed the penalty of dismissal from service on the
Petitioner.
4.
In view of the memo filed by the Counsel for the Petitioner conceding the legality and validity of the domestic
enquiry conducted in the present case, the domestic enquiry conducted by the Respondents is held as legal and valid vide
order dated 3.3.2014.
5.
Both the parties have advanced their arguments under Sec. 11(A) of the Industrial Disputes Act, 1947, in support
of their claim.
6.
In view of the above facts, the points for determination are :
I.
Whether the action of the management of M/s.Singareni Collieries Company Ltd., in imposing the
punishment of dismissal from service to Sri Koraveni Srinivas is legal and justified ?
II.
Whether the Petitioner is entitled for reinstatement into service ?
III.
If not, to what other relief he is entitled ?
7. Point No.I: At the outset Counsel for the Petitioner submitted that, while deposing during the course of regular
enquiry, the petitioner categorically pleaded that, his marriage was performed with Swapna on 09-05-1997 and the said
marriage was even registered with the Registrar of Marriages, Mancherial and he has already submitted the marriage
certificate (MD-20) to the Company. The Petitioner also deposed that, their marriage was inter caste and love marriage.
His mother-in-law i.e. DW3 applied for his appointment under the Dependent Employment Scheme and the officials of
the Company and the Committee for Dependent Employment, having verified and got satisfied with the application
submitted by his mother-in-law, he was given employment as Badli Filler. He has also deposed that, he has not
submitted any false and fabricated documents, as alleged. On conclusion of his statement, he was cross examined by the
Presenting Offier. The petitioner at Q.Nos.23 & 24 once again reiterated that, his mother-in-law i.e. DW3 applied for his
dependent employment and, while doing so, they have submitted all the documents necessary for claiming dependent
employment. At Q.No.25, the petitioner deposed that, his wife Swapna was aged about 19 years at the time of
submitting the application for dependent employment. At Q.Nos.30 & 31, the petitioner deposed that, his marriage with
Swapna was performed at Godavarikhani in presence of relatives and friends. At Q.No.33, the petitioner deposed that,
his marriage was performed in presence of his mother-in-law and his parents, in addition to others. At Q.No.37, the
petitioner deposed that, their marriage was inter-caste marriage. At Q.No.40, the petitioner deposed that, MD-15 is their
marriage photo, which shows, himself and his wife Swapna. At Q.No.45, the petitioner deposed that, his marriage was
performed with Swapna and not with Padma.
8.
The Counsel for the Petitioner also submitted that, during the regular enquiry, DW1 categorically deposed that,
Sri Uppuleti Mondi was his co-workman. He knows the family of Late Sri Uppuleti Mondi and on the request of DW3
i.e. wife of Late Sri Uppuleti Mondi, he signed as a witness on the application submitted by DW3 for appointment of the
petitioner, under Dependent Employment Scheme. He also deposed that, during the interview conducted by the
Dependent Employment Committee, he appeared and signed as a witness, on the papers (forms) confirming the petitioner
as the son-in-law of Late Sri Uppuleti Mondi. During the cross examination he deposed that, he and Late Sri Uppuleti
Mondi worked together for 7 years and the family members of Late Sri Uppuleti Mondi came to Mine premises to apply
for dependent employment, and he met them there. DW1 also deposed that, on being introduced by DW3 and mother of
Uppuleti Mondi, in front of all the workmen and officers, he came to know that the petitioner is the son-in-law of Late
Sri Uppuleti Mondi.
¹Hkkx IIµ[k.M 3(ii)º
Hkkjr dk jkti=k % vxLr 11] [email protected] 20] 1940
5073
9.
Counsel for the Petitioner further submitted that, during the regular enquiry, DW2 deposed that, Late Sri Uppuleti
Mondi, was his co-workman at GDK-3 Incline and Late Sri Mondi and he himself used to reside in Seetanagar area and
as such, they know to each other. DW2 further deposed that, DW3 and the mother of Late Sri Uppuleti Mondi came to
his house and informed him that, they are applying for employment to their son-in-law i.e. the petitioner and requested
him to sign as a witness. He Stated that as Late Sri Uppuleti Mondi was his co-workman, when the family of Late
Sri Uppuleti Mondi came to the mine premises, he has signed on the application form confirming the petitioner as the son-
in-law of Late Sri Uppuleti Mondi. During the cross-examination, DW2 at Q.Nos.1, 2 & 3 categorically reaffirmed that,
Late Sri Uppuleti Mondi and he used to reside at Seetanagar area. DW2 also deposed that, marriage of the petitioner and
Swapna was performed, and also deposed that, he signed on the application for dependent employment of the petitioner.
10.
The counsel for the Petitioner also argued that, during the regular departmental enquiry, though the Presenting
Officer has not chosen to examine any witnesses, thereafter the petitioner was examined himself and on his behalf DW1
to DW3 were examined. DW3 was none other than the petitioner’s mother-in-law i.e. the wife of Uppuleti Mondi and
the mother of the petitioner’s wife Smt Swapna. DW3 has categorically deposed during the enquiry that, the petitioner is
the husband of her elder daughter Swapna. Both of them were got married in the year 1997 in Ramalayam in Seetanagar
of Godavarikhani. The Petitioner being her son-in-law, she applied for his dependent employment by submitting an
application, which was counter signed by DW1 & DW2, who were the co-workmen of her Late husband. During the
course of cross examination, the evidence of DW1 to DW3 remained unrebutted. However, such unrebutted evidence of
the petitioner & DW1 to DW3 was ignored, by relying upon the documents collected and the statements recorded during
the preliminary enquiry by the Vigilance Authorities. During the enquiry, neither any Vigilance Authorities were
examined nor any documents were proved, through any competant witness.
11.
During the course of arguments, the Learned Counsel appearing on behalf of the Petitioner submitted that,
whenever a departmental enquiry is conducted, the PO/Management representative should produce the relevant
documents, to mark and prove it, through relevant witnesses, to substantiate the charge. The Presenting Officer himself
cannot treated as lone witness, to depose the evidence. In the instant case, one Sri.A.Sampath Kumar, Dy.P.M. deposed
as the PO and produced Exs MD-1 to MD-23, but he has not chosen to examine any witnesses to prove the documents
produced by him. However, exclusively relying upon those unproved documents, charge was held proved by the enquiry
officer. Basing on such finding of the enquiry officer, the Petitioner was dismissed from service. While submitting the
above aspects, the Learned Counsel for the Petitioner relied upon a case Law reported in 2011 (3) ALD 442 – GM,
SCCL Ltd., Mandamarri Division, Kalyankhani, Adilabad Vs. Mohd. Fareed, wherein the Hon’ble High Court of A.P.
held that, “In the instant case, the charge against the respondent was that, he filed a fake medical certificate pertaining to
his father. The petitioner (i.e. company) was under obligation to prove that charge by examining the persons, who came
to the conclusion, or confirmed the opinion that the certificate is fake. The case was presented before the enquiry officer
by the Presenting Officer. Not a single witness was examined. For all practical purposes, the Presenting Officer answers
the description of a Counsel, and by no stretch of imagination, he can be treated as witness, much less, he can vouch for
the correctness or otherwise of the documents, produced by him. It is only the persons who are the custodians of the
concerned records, or who are acquainted with the facts of the case, that can be examined as witnesses and who can
throw light upon a truth or otherwise of the allegation or charge. Once it has emerged that no person was examined in
support of the charge, the inescapable conclusion is that, the charge was not proved at all. The Labour Court noticed this
serious flaw, and held that the charge against the respondent was not proved. This court is not inclined to take any
different view.
12.
The counsel for the Petitioner also contended that, in the instant case also, Presenting Officer has not examined
any witness nor proved any document. Only the statement of the Presenting Officer was recorded and basing on his
statement and unproved documents produced by him, the Enquiry Officer held the charge as proved. Such conduct on
the part of the Enquiry Officer was deprecated by the Hon’ble High Court of A.P. in the above referred case, more
interestingly, in the above cited case also, the management was Singareni Collieries Company Ltd., and in the present
case also the Management is the Singareni Collieries Company Limited.
13.
The counsel for the Petitioner further urged that, when the management alleges that, the petitioner obtained
employment by producing fabricated documents, false information and witnesses, onus lies on the management to prove
the charge. Mere filing of documents is not sufficient to rely upon, but, those documents are to be marked and proved
during the enquiry through relevant witnesses. In the instant case, the management did not examine any witnesses except
recording the statement of the Presenting Officer. The sole statement of the Presenting Officer, cannot be treated as
evidence of any witness. As such, the documents relied upon by the Presenting Officer cannot be relied upon to
substantiate the charge.
14.
In support of the above contention, the Learned Counsil for the Petitioner relied on the following judgments
reported in AIR 1972 SC 1031 – Delhi Cloth & General Mills Vs. Lud Bud Singh, whereat, the Hon’ble Supreme Court
held that, “The Enquiry Officer has also committed another mistake when he proceeded on the basis that as the workman
has not adduced any evidence in his defence, it is not open to him to contend that he was not responsible for the acts of
destruction and damages. This observation clearly shows that the Enquiry Officer has missed the elementary principle of
5074
THE GAZETTE OF INDIA : AUGUST 11, 2018/SRAVANA 20, 1940
[PART II—SEC. 3(ii)]
jurisprudence that when allegations of misconduct are levelled against a person, it is the primary duty of the person
making those allegations to establish the same and not for an accused to adduce negative evidence to the effect that he is
not guilty” In WA No.37/2013 – SPDCL Vs. Yesudas, the Division Bench of the Hon’ble High Court of A.P. held that,
WA No.37/2013 – SPDCL Vs. Yesudas, “The Enquiry Officer has a duty to arrive at a finding upon taking into
consideration the materials brought on record by the parties. The purported evidence, i.e. the correspondence between
the Head Master, Medikondue collected during investigation by the Investigating Officer against the respondent by itself,
could not be treated to be evidence in the disciplinary proceeding, inasmuch as no witness was examined to prove the
said documents. The management witnesses merely tendered the documents sent by the said Head Master and did not
prove the contents thereof. Reliance was placed by the Enquiry Officer on such correspondence which could not have
been treated as evidence. Therefore, the only basic evidence whereupon reliance has been placed by the Enquiry Officer,
was the purported documents appended in the service register of the respondent, to which there was no direct evidence.
Even there was no indirect evidence. The Enquiry Officer, without applying his mind in proper perspective as to how the
said document was appended in the service register of the respondent had made up his mind to find him guilty, as
otherwise he would not have proceeded on the basis that the offence was committed in such a manner that no evidence
was left. It is to be seen, there is a distinction in proof and suspicion. In DEE (O) AP TRANSCO, Guntur & another Vs.
Labour Court, Guntur & another, reported in 2011 (3) ALD 536, the Hon’ble High Court of A.P. held as follows : “It is
not in dispute that no witnesses were examined by the Domestic Tribunal. It straightaway proceeded to examine the
workman and concluded the inquiry. Therefore, the TRANSCO had failed to discharge the initial burden lying on it to
bring home the guilt of the workman by leading specific evidence in respect of the charge laid against him. Until and
unless this primary onus is discharged by the employer, no obligation to prove his defence shifts on to the shoulders of
the employee. It is one thing to say about the sufficiency of the material, but it is altogether a different thing to say that
the initial burden of establishing the charge itself has been not discharged. Further, when the Headmaster of the school
has been contacted by the Divisional Engineer, he sent up a communication raising doubts about the genuineness of the
certificate produced by the workman. Unless the Headmaster has been examined and the workman has been provided
with an opportunity to cross examine him the workman could not have established his defence properly and he could not
have brought home his defence that he is not guilty of producing any false educational certificate. He would have an
opportunity to explain away the adverse material which lent support to suspect the genuineness of the certificate
produced by him. In that view of the matter, non-examination of the Headmaster of the school, certainly, amounts to
denying a fair and reasonable opportunity of enabling him establish his defence”. In 2011 (1) ALD 713 – S.L.Narsaiah
Vs. Addl. Labour Court, Hyderabad, the Hon’ble High Court of A.P. held that, “In the disciplinary proceedings, basically
it is for the employer or the management to prove the charges framed against an employee. The mere fact that the
employee did not adduce any evidence does not become material. Further it would be mostly in the form of rebuttal
evidence. Therefore, much would depend upon the strength of the evidence which the employer maintained”.
15.
Counsel for the Petitioner further pleaded that, in catena of judgments the Hon’ble Supreme Court as well as the
Hon’ble High Courts held that, the role of preliminary EO and the documents collected and statements recorded, during
the preliminary enquiry, becomes redundant, once a decision is taken to conduct the regular departmental enquiry.
During the regular departmental enquiry, if, the management wanted to rely upon the statements recorded during the
preliminary enquiry, then such of those witnesses, who were examined in the preliminary enquiry should be produced in
the regular departmental enquiry, giving an opportunity of cross examination to the petitioner. Then only, the statements
recorded during the preliminary enquiry can be relied upon. The counsel for the Petitioner pleaded that, the EO relied
upon the statements allegedly recorded by the Vigilance Department from U.Gangamma (DW3), to hold the charge as
proved, without even examining the Vigilance Authorities. During the regular enquiry, DW3 categorically denied the
correctness of the statements allegedly recorded by the Vigilance Authorities and also CD relied upon by the Vigilance
Department. Despite, ignoring the evidence recorded during the regular departmental enquiry, by relying upon the
alleged statement recorded by the Vigilance Authorities during the preliminary enquiry, the enquiry officer held the
charge as proved. Counsel for the Petitioner pleaded that, such finding of the enquiry officer is illegal and contrary to the
dicta laid down by the Hon’ble High Courts & Hon’ble Supreme Court.The learned Counsil for the petitioner in support
of his stand relied upon the following judgments: Reported in 2001 (5) ALT 65 (DB) – K.David Wilson Vs. Secretary
to Government, Law Department (Legislative Affairs and Justice), Hyderabad and another, “It is well settled that the
disciplinary authority cannot make use of any material of evidence collected by it in the course of preliminary enquiry
against the delinquent official unless those materials and evidence are produced and proved in accordance with law in the
regular departmental enquiry and the delinquent employee is given a fair opportunity to meet those adverse materials and
evidence. In the instant case this well settled rule governing departmental enquiry is completely breached. On that count
also, the departmental enquiry conducted against the petitioner is vitiated. A departmental enquiry conducted for the
purpose of disciplinary action against a public servant is not an empty formality. It is a serious proceeding intended to
give the delinquent a chance to meet the charges and prove his innocence. The right of the delinquent officer to cross-
examine witnesses who give evidence against him is a valuable right and in order to effectively exercise this right, it is
necessary that the examination-in-chief of the witnesses should be recorded in the presence of the party against whom the
deposition is made. An enquiry wherein examination-in-chief has been recorded in the absence of the person charged
though he is allowed to cross-examine the witness, cannot be said to have been held in accordance with the rules of
¹Hkkx IIµ[k.M 3(ii)º
Hkkjr dk jkti=k % vxLr 11] [email protected] 20] 1940
5075
natural justice. This position is well settled by the Judgments of the Supreme Court in Union of India V. T.R.Varma,
Jagdish Prasad Saxama V. State of Madhya Bharat, State of Madhya Pradesh V. Chintaman Sadasiva and a catena of
other decisions to follow. The Calcutta High Court in Choudhury V Union of India and others, where the concerned
employee was confronted with the evidence of the witnesses examined behind his back and where some of such
witnesses were not tendered for cross-examination held that the enquiry was vitiated by violation of principle of natural
justice and the dismissal order based on such enquiry must be hold to be invalid”. The same principle was reiterated by
Hon’ble Apex Court in a case reported in (2013) 4 SCC 301 – Nirmala Jhala Vs. State of Gujrat, wherein it was held,
“we have to consider the most relevant issue involved in this case. Admittedly, the enquiry officer, the High Court on
administrative side as well on judicial side, had placed a very heavy reliance on the statement made by Shri C.B.Gajjar,
Advocate, Mr.G.G.Jani, complainant and that of Shri P.K.Pancholi, Advocate, in the preliminary inquiry before the
Vigilance Officer. Therefore, the question does arise as to whether it was permissible for either of them to take into
consideration their statements recorded in the preliminary inquiry, which had been held behind the back of the appellant,
and for which she has no opportunity to cross-examine either of them. A Constitution Bench of this court in Amalendu
Ghosh V. North Eastern Railway, held that the purpose of holding a preliminary inquiry in respect of a particular alleged
misconduct is only for the purpose of finding a particular fact and prima facie, to know as to whether the alleged
misconduct has been committed and on the basis of the findings recorded in preliminary inquiry, no order of punishment
can be passed. It may be used only to take a view as to whether a regular disciplinary proceeding against the delinquent
is required to be held. Similarly in Champaklal Chimanlal Shah V. Union of India, a Constitution Bench of this Court
while taking a similar view held that preliminary inquiry should not be confused with regular inquiry. The preliminary
inquiry is not governed by the provisions of Article 311 (2) of the Constitution of India. Preliminary inquiry may be held
ex parte, for it is merely for the satisfaction of the Government though usually for the sake of fairness, an explanation
may be sought from the government servant even at such an inquiry. But at that stage, he has no right to be heard as the
inquiry is merely for the satisfaction of the Government as to whether a regular inquiry must be held. The Court further
held as under (AIR p.1862, para 12),“12. .... There must therefore be no confusion between the two enquiries and it is
only when the government proceeds to hold a departmental enquiry for the purpose of inflicting on the government
servant one of the three major punishments indicated in Article 311 that the government servant is entitled to the
protection of that article (, nor prior to that)” In Narayana Dattatraya Ramteerthakhar Vs. State of Maharashtra, this Court
dealt with the issue and held as under : “... a preliminary inquiry has nothing to do with the enquiry conducted after issue
of charge-sheet. The preliminary enquiry is only to find out whether disciplinary enquiry should be initiated against the
delinquent. Once regular enquiry is held under the Rules, the preliminary enquiry loses its importance and, whether
preliminary enquiry was held strictly in accordance with law or by observing principles of natural justice of (sic) nor,
remains of no consequence.” “In view of the above, it is evident that the evidence recorded in preliminary inquiry cannot
be used in regular inquiry as the delinquent is not associated with it, and opportunity to cross-examine the persons
examined in such inquiry is not given. Using such evidence would be violative of the principles of natural justice.” In
Ayaaubkhan Noorkhan Pathan V. State of Maharashtra this Court while placing reliance upon a large number of earlier
judgments held that cross-examination is an integral part of the principles of natural justice, and a statement recorded
behind back of a person wherein the delinquent had no opportunity to cross-examine such persons, the same cannot be
relied upon. The preliminary enquiry may be useful only to take a prima facie view, as to whether there can be some
substance in the allegation made against an employee which may warrant a regular enquiry”.
16.
On the other hand the learned Counsel for the respondents reiterated the contents of the counter and argued that,
as the charge was established in the enquiry, punishment imposed on the Petitioner is justified and no interference is
required by this Court. The counsel for the respondents contended that, as most of the documents relied upon by the
Presenting Officer are official documents, they need not be specifically proved through any relevant witnesses. The
enquiry officer has rightly conducted a detailed and elaborate enquiry and after considering the evidence available on
record, he has rightly held the charges as proved. The counsel for the respondents further contended that, on receipt of
reply to the show cause notice, the disciplinary authority also considered all the records in detail and found that the
findings of the enquiry officer are perfect and as such, punishment was imposed on the petitioner for obtaining
employment fraudulently. He further contented that the domestic enquiry conducted in this case is held legal and valid,
So the petitioner has no locus-standi to re-agitate the same issue.
17.
On consideration of the submission made by the consels for both the sides and on a bare perusal of the evidence
adduced during the enquiry by the petitioner along with the evidence of DW1 to DW3 establishes about, the factum of
performance of marriage between the petitioner and the elder daughter of DW3 i.e. Swapna. It was also established that,
DW3 herself applied for the dependent employment of the petitioner, which was even signed by DW1 & DW2. It was
also proved during the enquiry that, the marriage of the petitioner and the elder daughter of Sri Uppuleti Mondi, was
registered with the Registrar of Marriages, Mancherial and the said certificate was produced before the authorities, while
seeking dependent employment. It was also established that, while considering the application for dependent
employment of the petitioner, the Dependent Employment Committee and the authorities of the 1st respondent company,
have thoroughly verified the credentials of the petitioner, and only after satisfying themselves, the petitioner was given
employment. Therefore, holding the charge as proved by the enquiry officer and dismissing the petitioner from service,
is wholly untenable.
5076
THE GAZETTE OF INDIA : AUGUST 11, 2018/SRAVANA 20, 1940
[PART II—SEC. 3(ii)]
18. As pointed out by the counsel for the Petitioner, during the cross examination, the Presenting Officer has
categorically admitted that, basing on the application submitted by DW3 and also the statement of DW1 & DW2, the
Departmental Interview Committee recommended the case of the petitioner for dependent employment and the same was
done, as per the procedure existing in the Company. The Presenting Officer also accepted that, application submitted by
DW3 seeking employment to the petitioner, application for employment under Clause-9.4.1 of NCWA and the
statements of the witnesses i.e. DW1 & DW2 to provide employment to the petitioner, were verified by the Head of the
Department before issuing the order of appointment to the petitioner. The Presenting Officer also accepted that, the
Management never felt MD24, 25 & 26 are false documents and by treating those doucuments as valid documents, the
petitioner was given employment. However, the Presenting Officer stated that, basing on the preliminary enquiry
conducted by the Vigilance Department, the management feels that the petitioner was not a bonafide son-in-law of Late
Sri Uppuleti Mondi. However, the fact remains that, the documents collected during the preliminary enquiry were
obtained behind the back of the petitioner, which were not proved, during the enquiry, no witness including any officials
of the Vigilance Department were examined, during the course of regular departmental enquiry, to prove those
documents.
19.
As a matter of fact, the Presenting Officer accepted that, only on the recommendation of the Dependent Interview
Committee, the petitioner was given employment. The Presenting Officer accepted that, marriage certificate issued by
the Registrar of Marriage has not been declared as false, either by any competent authority or by court. However, basing
on the documents procured by the Vigilance Authority during the preliminary enquiry, it is being treated that, the
petitioner’s marriage with Swapna was not bonafide in nature. The Presenting Officer further stated that, though he was
not a management witness, his statement is sufficient to prove the charge and other witnesses need not be produced in
support of the charge alleged. Such contention of the Presenting Officer is wholly illegal and contrary to the well
established law and principles of natural justice and contrary to the law laid down by the Hon’ble High Court of A.P. in
2011 (3) ALD 442. Relying upon the sole statement of the PO, the charge cannot be treated as proved, as held by the
Hon’ble High Court of A.P. in GM, SCCL Ltd, Mandamarri Division Vs. Mohd. Fareed, reported in 2011 (3) ALD 442
20.
As per the judgments relied upon by the counsel for the Petitioner, the PO cannot be treated as a witness and his
sole statement cannot be relied on to substantiate the charge as was laid down by the Hon’ble High Court of A.P. in the
reported judgment in 2011 (3) ALD 442. In the instant case, except recording the statement of the Presenting Officer, no
other witness was examined on behalf of the management. The counsel for the Petitioner also rightly pointed out that,
mere filing of documents is not sufficient. The documents should be proved through relevant witnesses during the
regular departmental enquiry and onus to prove the charge is on the person, who alleges. As submitted supra, the above
proposition of law was time and again reiterated by the Hon’ble Supreme Court as well as the Hon’ble High Court of
A.P. in AIR 1972 SC 1031, WA No.37/2013, 2011 (3) ALD 536 & 2011 (1) ALD 713.
21.
The statements recorded and the documents obtained by the vigilance authorities are basically amounts to
preliminary enquiry. Basing on those statements and documents, a charge sheet was issued to the petitioner. Once a
decision is taken to conduct a regular departmental enquiry, the statements recorded and the documents obtained during
the preliminary enquiry become redundant unless, the persons, whose statements were obtained during the preliminary
enquiry are examined during the regular departmental enquiry duly providing the opportunity of cross examination and
prove the documents through relevant witnesses during the regular departmental enquiry. In the instant case, no witness
was examined and none of the documents i.e. MD1 to ME23 were proved during the regular departmental enquiry. In
view of the judgments referred supra, i.e. 2001 (5) ALT 65 (DB) & (2013) 4 SCC 301 and for violation of principles of
natural justice, the findings of the Enquiry Officer amounts to perverse findings and the impugned order of dismissal,
which was issued basing on such perverse findings of the EO, is liable to be set aside.
22.
The conclusion arrived at by the EO that, the petitioner has not married to Swapna, D/o Late Uppuleti Mondi is an
absolute perverse finding, as, the evidence recorded during the course of regular departmental enquiry, not only from the
petitioner but also from DW1 to DW3, more specifically, the assertion of DW3 clearly establishes that, the petitioner got
married to Swapna. Further, it is also an established fact that, their marriage was registered with the Registrar of
Marriages, Mancherial and the said document is subsisting even as on today, which was even admitted by the PO during
the course of cross examination. Ignoring all the valid evidence, only by relying upon the statements recorded by the
Vigilance Department during the preliminary enquiry, the Enquiry Officer ought not to have arrived at such arbitrary
and presumptive conclusion, holding the charge as proved. The Enquiry Officer has to consider the evidence recorded
during the course of regular departmental enquiry, but not the statements recorded during the preliminary enquiry. But,
in the instant case, conclusion of guilt on the part of the petitioner, was arrived at by the Enquiry Officer, exclusively
basing on the material collected during the preliminary enquiry, thereby making his findings as perverse in nature.
23.
The Enquiry Officer should act like a judge and should not be biased. Further, basing on the evidence recorded
during the course of enquiry only, the Enquiry Officer has to submit his report. Admittedly, documents considered and
relied upon by the Enquiry Officer to hold the charge as proved, have not been proved during the regular enquiry,
through any relevant witnesses. Therefore, reliance placed by the Enquiry Officer on such of those unproved documents
is wholly unjustifiable. On a bare perusal of the appreciation of the evidence by the Enquiry Officer in his report clearly
¹Hkkx IIµ[k.M 3(ii)º
Hkkjr dk jkti=k % vxLr 11] [email protected] 20] 1940
5077
establishes that, basing on the documents, which have not been proved during the enquiry, the Enquiry Officer
disregarded or disbelieved the evidence adduced during the course of regular departmental enquiry.
24.
In this regard, the counsel for the Petitioner relied on a case law reported in (2010) 2 SCC 772, in State of U.P.
Vs. Saroj Kumar Sinha, while asserting the necessity of EO to act unbiasedly like a judge, while conducting &
submitting his report held that, “It is only in a case when the government servant despite notice of the date fixed failed to
appear that the inquiry officer can proceed with the inquiry ex parte. Even in such circumstances it is incumbent on the
inquiry officer to record the statement of witnesses mentioned in the charge-sheet. Since the government servant is
absent, he would clearly lose the benefit of cross examination of the witnesses. But nonetheless in order to establish the
charges the Department is required to produce the necessary evidence before the inquiry officer. This is so as to avoid
the charge that the inquiry officer has acted as a prosecutor as well as a judge. An inquiry officer acting in a quasi-
judicial authority is in the position of an independent adjudicator. He is not supposed to be a representative of the
department/disciplinary authority / Government. His function is to examine the evidence presented by the Department,
even in the absence of the delinquent official to see as to whether the unrebutted evidence is sufficient to hold that the
charges are proved. In the present case the aforesaid procedure has not been observed. Since no oral evidence has been
examined the documents have not been proved, and could not have been taken into consideration to conclude that the
charges have been proved against the respondents. Apart from the above, by virtue of Article 311 (2) of the Constitution
of India the departmental enquiry had to be conducted in accordance with the rules of natural justice. It is a basic
requirement of the rules of natural justice that an employee be given a reasonable opportunity of being heard in any
proceedings which may culminate in punishment being imposed on the employee”.
25.
In view of the above discussion, the punishment imposed by the Respondents for dismissal of service is wholly
illegal and arbitrary. Therefore, it can safely be stated that the action taken by the management in imposing the
punishment of dismissal from service to Sri Koraveni Srinivas is not legal and justified.
Thus, Point No.I is answered accordingly.
26. Point Nos.II & III: In Point No.I, it has already been discussed that the punishment of dismissal from service to
Sri Koraveni Srinivas is not legal and justified. After dismissal of service as stated earlier, the Petitioner has come to the
court with a prayer for his reinstatement into service. As the Petitioner was dismissed from service arbitrarily, he is
entitled to be re-instated in service as Coal Filler with continutiy of service. But the petitioner was terminated from
service and has not done any work, so he is only entitled to get 50% of back Wages.
Thus, Point Nos. II and III are answered accordingly.
ORDER
The impugned proceeding No.SRP/PER/13.008/980 dated 10.3.2009 issued by the 2nd Respondent is illegal and
arbitrary and is hereby set aside. The Respondents are directed to reinstate the Petitioner into service with continuity of
service. Since the Petitioner has not worked for the period from the date of dismissal till date he is only entitled to get
50% of back wages.
Award is passed accordingly. Transmit.
Typed to my dictation by Smt. P. Phani Gowri, Personal Assistant, corrected by me on this the 27th day of June,
2018.
MURALIDHAR PRADHAN, Presiding Officer
Appendix of evidence
Witnesses examined for the Petitioner
Witnesses examined for the Respondent
NIL
NIL
Documents marked for the Petitioner
NIL
Documents marked for the Respondent
NIL
5078
THE GAZETTE OF INDIA : AUGUST 11, 2018/SRAVANA 20, 1940
[PART II—SEC. 3(ii)]
ubZ fnYyh] 2 vxLr] 2018
dk-vk- 1187-—vkS|ksfxd fookn vf/fu;e] 1947 (1947 dk 14) dh èkkjk 17 ds vuqlj.k esa dsUnzh; ljdkj eSllZ dsUæh;
Hk.Mkj ds çcaèkra=k ds lac¼ fu;kstdksa vkSj muds deZdkjksa ds chp] vuqcaèk esa fu£n"V vkS|ksfxd fookn esa dsUnzh; ljdkj vkS|ksfxd
vfèkdj.k&lg&Je U;k;ky;] y[kuÅ ds iapkV (lanHkZ la[;k 26@2005) dks çdkf'kr djrh gS] tks dsUnzh; ljdkj dks 31-07-2018 dks
çkIr gqvk FkkA
¹la- ,y&42012@155@2004&vkbZvkj (lh,e&II)º
jktsUæ flag] vuqHkkx vf/dkjh
New Delhi, the 2nd August, 2018
S.O. 1187.—In pursuance of Section 17 of the Industrial Disputes Act, 1947 (14 of 1947), the Central
Government hereby publishes the Award (Ref. No. 26/2005) of the Central Government Industrial Tribunal-cum-Labour
Court, Lucknow as shown in the Annexure, in the industrial dispute between the management of M/s. Kendriya Bhandar
and their workmen, received by the Central Government on 31.07.2018.
[No. L-42012/155/2004-IR (CM-II)]
RAJENDER SINGH, Section Officer
ANNEXURE
CENTRAL GOVERNMENT INDUSTRIAL TRIBUNAL-CUM-LABOUR COURT, LUCKNOW
PRESENT :
RAKESH KUMAR, Presiding Officer
I.D. No. 26/2005
Ref. No. L-42012/155/2004-IR(CM-II) dated 24.06.2005
BETWEEN
Sri Avinash Nigam S/o Sh.Suresh Chandra,
R/o 566/28, G, Jaiprakash Nagar,
Lucknow (U.P.)
AND
1.
The General Manager,
Kendriya Bhandar,
Pushpa Bhawan,
New Delhi
2. The Regional Manager,
Kendriya Bhandar,
HAL Shopping Complex,
Lucknow
AWARD
1.
By order No. L-42012/155/2004-IR(CM-II) dated 24.06.2005 the Central Government in the Ministry of Labour,
New Delhi in exercise of powers conferred by clause (d) of sub-section (1) and sub-section (2A) of Section 10 of
the Industrial Disputes Act, 1947 (14 of 1947) referred this industrial dispute between the Sri Avinash Nigam S/o
Sh. Suresh Chandra and the General Manager/Regional Manager, Kendriya Bhandar, New Delhi/Lucknow
adjudication.
2.
The reference under adjudication is:
“KYA PRABANDHAK, KENDRIYA BHANDAR, LUCKNOW DWARA SRI AVINASH NIGAM S/O SRI
SURESH CHANDRA, DAINIK VETAN ME KARYARAT CLERK-CUM-TYPIST KO DINANK
12.06.2002 SE NAUKARI SE NIKALA JAANA NYAYOCHIT TATHA NYAYSANGAT HAI? YADI
NAHIN, TO SAMBANDHIT KARMKAR KIS ANUTOSH KA HAQDAR HAI?”
3.
As per claim statement W-3 dated 28.10.2005, the petitioner has stated in brief that he was appointed as Clerk-
cum-Typist on daily wages by opposite party no.3/Regional Manager, Kendriya Bhandar on 15.06.1997 with the
consent of opposite party nos.1 & 2. He has further asserted that he has been working continuously at Regional
¹Hkkx IIµ[k.M 3(ii)º
Hkkjr dk jkti=k % vxLr 11] [email protected] 20] 1940
5079
Manager’s office, Lucknow as per directions of opposite party with full satisfaction, and no complaint was ever
lodged against him, the vacancy was clear and permanent in nature, and for regularization on daily wage workers
of Lucknow region, through letter dated 4.11.1998, opposite party no.3 recommended for regularization, and the
petitioner was senior to Sri Jyoti Pravartak.
4.
The petitioner has pleaded that opposite party no.2 issued a letter dated 4.11.1998 for regularization of few daily
wage worker upto sl.no.6 only, therefore opposite party no.3 again sent letter dated 28.8.2000 with the request to
regularize the remaining two persons and it was assured to the management committee that the names mentioned
at sl.no.7 and 8 have completed 3 years of service in the organization, and their work and conduct was found to be
satisfactory during the last 3 years. It has been alleged by the workman that opposite party no.3 allotted sl.no.7 to
Sri Jyoti Pravartak and sl.no.8 to the petitioner, although the petitioner was senior to him, objection was raised
against this anomaly and discrimination. Sri Jyoti Pravartak was regularized by opposite party no.1 & 2 and did
not consider the legal claim of the applicant. Several oral and written requests were made by the petitioner and in
compliance of the formalities required by the management he had also deposited Rs.5000/- towards security
through FDR in favour of Kendriya Bhandar, even then his claim was not considered and grievances were not
redressed.
5.
It has further been stressed by the petitioner that on his frequent request for the regularization , opposite party no.3
stopped the payment of salary for the month of May 2002 and w.e.f. 12.06.2002 attendance register was also not
provided when he approached the office to perform his duties in the usual course. Mandatory provisions of law
for retrenchment were not followed and he was debarred to work w.e.f. 12.06.2002. Violation of Section 25 etc. of
the I.D. Act has also been alleged.
6.
With the aforesaid pleadings request has been made to set aside the oral termination/’debar from work’ order dt.
12.06.2002, and to reinstate the petitioner in service with full back wages alongwith consequential benefits etc.
Several documents have been annexed with the claim statement.
7.
The management has filed written statement M-24 dated 22.12.2005 with denial of the allegations leveled in the
claim statement. The management has submitted that although several names of daily wage earners alongwith the
applicant were sent for consideration for regularization of service but thereafter the petitioner changed his attitude
towards his duties and therefore he could not get the benefit of the same. The opposite party has alleged that the
conduct of the petitioner was not found satisfactory and to continue him in the department had become a source of
indiscipline, fraud, impertinence, cheating etc., thereafter his engagement came to an end.
8.
The opposite party has further asserted that engagement of the petitioner on daily wage basis was wholly and
solely on the basis of availability of the work. Initially his work and conduct was found satisfactory and
recommended for regularization alongwith other employees and the petitioner was junior amongst the candidates
recommended for consideration for regularization of service.
9.
It has further been stated by the management that the petitioner workman started losing interest in his official
duties allocated to him, moreover he mis-used the management’s money, and often he misused the name of ARM
and was caught on several occasions introducing himself as Asstt. Regional Manager. It has also been alleged that
the petitioner took money in the form of loan from the suppliers for his personal use, which caused disrepute to
the department. He was caught, quite often dozing and napping while on duty, several blank signed bills were
handed over to the suppliers by him which caused loss to the management, amounting to Rs.2 lakhs. Misuse of
official telephone and mobile phone has also been alleged by the management. Fraudulent purchase of cash card
for his personal use and attempt to cheat the management has also been pleaded in the written statement.
10.
The opposite party has contended that although being warned on several occasions by the competent authority, the
conduct of the petitioner did not improve. An opportunity was provided to him to amend himself and he was
transferred from the Regional Office, Lucknow to Mankapur Store but even then he did not improve his work and
conduct, instead of joining at the new place he with the help of his father-in-law, and wife and other relatives
started threatening the management authorities. Regreting his misconduct and misbehaviour etc. letter dated
27.05.2002 was sent by him to the Regional Manager, Kendriya Bhandar, Lucknow. The opposite party has
further stated that the petitioner had lost his good sense, physical health and mental balance due to some internal
family matters etc. The work and conduct of the petitioner was not found satisfactory up to the mark, compelling
thereby to the management to refrain from taking any work from him. Since he was engaged on daily wage basis
therefore no appointment letter was ever issued to him hence there was no requirement to provide any termination
letter as well.
11.
The opposite party has emphasized that the provisions of I.D. Act. are not applicable to the case of the petitioner.
Prouncements of Hon’ble Apex Court have also been mentioned in the written statement. With the aforesaid
pleadings request has been made to declare the action of the management as legal and justified. Several
documents have been annexed as per list M-25.
5080
THE GAZETTE OF INDIA : AUGUST 11, 2018/SRAVANA 20, 1940
[PART II—SEC. 3(ii)]
12.
With strong denial of the allegations leveled in the written statement, rejoinder W-22 dated 9/03/2006, alongwith
an affidavit has been filed by the workman reiterating the pleas taken earlier in the claim statement.
13.
It may be quite pertinent to mention here that the referred dispute, has been adjudicated ex-parte against the
petitioner workman, by the then Hon’ble Judge/Presiding Officer, vide award dated 14.11.2008 and notified on
25.11.2008. Later on the aforesaid award was set aside and restored to its original stage vide order dated
20.10.2010 passed by the then Hon’ble Judge/PO.
14.
The petitioner workman filed his affidavit W-40, in evidence, he was thoroughly cross-examined on behalf of the
management.
15.
Before ex-parte adjudication, the management has filed affidavit M-38 dated 20.10.2008 of Sri Manoj Kumar
Gupta, Regional Manager, Kendriya Bhandar, Lucknow, alongwith annexures. It is evident from the record that
after conclusion of the workman-evidence, the opposite party/management was required to adduce its evidence.
Several dates were fixed for this purpose from 09.09.2013 to 11.05.2015 but neither any evidence was adduced
nor earlier witness Sri M.K. Gupta, was produced in the Court for his cross examination. Under these
circumstances, opportunity of further management evidence was closed and the case was fixed for final
arguments. Again 30 dates were given for the purpose, but the opposite party refrained itself from submitting
arguments before the Court. Neither any official of the management nor any Authorized Representative appeared
in the Court to advance arguments. The case can not be endlessly lingered on without any legitimate genuine
reason.
16.
Arguments of learned AR for the workman have been heard at length. Record has been scanned thoroughly.
17.
It has been submitted on behalf of the workman that he was engaged as Clerk-cum-Typist on daily wage basis by
the opposite party w.e.f. 15.06.1997 and had worked continuously as such till 12.06.2002 without any show-cause
notice or notice-pay in lieu thereof, his services were terminated, in violation of the provisions of the I.D. Act. and
against the principle of natural justice. It has further been alleged that several other employees junior to him have
been regularized by the management, but the petitioner was dis-engaged without any formal departmental enquiry
or genuine justification, although he had worked for more than 240 days in the preceeding 12 calander months on
the date of the aforesaid termination.
18.
Learned AR for the workman has relied upon the following citations:
1.
2018, LLR, Kurushetra University vs Prithvi Singh page 371, Hon’ble SC.
2.
2018, LLR, Vinod Singh Yadav vs M/s. Securitans India Pvt. Ltd. page 375, Hon’ble Delhi High Court.
19.
The Written Statement submitted by the management, has not been duly corroborate by any cogent evidence. The
affidavit filed by the management in support of its Written Statement, can not be legally and legitimately relied
upon by this Court since the workman could not get any opportunity to cross-examine the management witness,
who was never again produced in the Court by the management. Moreover, no other evidence was adduced by the
management, although sufficient opportunity was provided.
20.
For the so called mis-behaviour of the workman or the alleged mis-representation made by him, whether any
formal enquiry was conducted by the management, has not been brought on record, neither any FIR was lodged
by the management for the alleged cheating. Mere averments in the written statement can not be treated as
conclusive proof.
21.
Therefore, in view of the law laid down by Hon’ble Apex Court in (2006) 3 SCC 278 State of U.P. Vs Sheo
Shanker Lal Srivastava & others; the statement of the witness, having not been controverted would be deemed to
be admitted, there is no reason to disbelieve the statement of workman.
22.
After having heard the intellect arguments advanced by the learned AR for the workman, on perusal of the record
in the light of the prouncements of Hon’ble Courts referred here in above, it is inferred that the action of the
management for disengagement of the petitioner workman w.e.f. 12.06.2002, can not be treated as legal and
justified. The petitioner workman is entitled for reinstatement and regularization, as per Rules. The management is
directed to ensure payment of 50% of the back wages with con- sequential benefits to the petitioner workman
within 10 weeks from the date of notification of the award.
23.
Award as above.
LUCKNOW
14.06.2018
RAKESH KUMAR, Presiding Officer
¹Hkkx IIµ[k.M 3(ii)º
Hkkjr dk jkti=k % vxLr 11] [email protected] 20] 1940
5081
नई दली, 2 अगत, 2018
का.आ.
का.आ.
का.आ.
का.आ. 1188
1188
1188
1188.—राsपित, &ी अवतार च"द डोगरा पीठासीन अिधकारी, के"# सरकार औ`ोिगक अिधकरण -सह -&म "यायालय
सं. 1, दली को दनांक 07.08.2018 से छ: माह क आगे क अविध तक अथवा िनयिमत आधार पर पद भरे जाने तक अथवा अगले
आदेश6 तक, जो भी पहले हो, पीठासीन अिधकारी, क!# सरकार औ`ोिगक अिधकरण- सह- &म "यायालय सं. 1 एवं 2, चंडीगढ़ के पद
का अितfरI 4भार स|पते ह ।
[सं. ए -11016/04/2017-सीएलएस-II]
अजय मिलक, अवर सिचव
New Delhi, the 2nd August, 2018
S.O. 1188.—The President is pleased to extend the period of additional charge of the post of Presiding Officer of
the Central Government Industrial Tribunal-cum-Labour Courts No. 1 & 2, Chandigarh entrusted to Shri Avtar Chand
Dogra, Presiding Officer, Central Government Industrial Tribunal-cum-Labour Court No.1, Delhi for a further period of
06 months with effect from 07.08.2018, or till the posts are filled up on regular basis, or until further orders, whichever is
the earliest.
[No. A-11016/04/2017-CLS-II]
AJAY MALIK, Under Secy.
ubZ fnYyh] 6 vxLr] 2018
dk-vk- 1189-—vkS|ksfxd fookn vf/fu;e] 1947 (1947 dk 14) dh èkkjk 17 ds vuqlj.k esa dsUnzh; ljdkj eSllZ vks-,u-
th-lh- fyfeVsM ds çcaèkra=k ds lac¼ fu;kstdksa vkSj muds deZdkjksa ds chp] vuqcaèk esa fu£n"V vkS|ksfxd fookn esa dsUnzh; ljdkj
vkS|ksfxd vfèkdj.k ,oa Je U;k;ky;] vgenkckn ds iapkV (lanHkZ la[;k 24@2010) dks çdkf'kr djrh gS] tks dsUnzh; ljdkj dks
01-08-2018 dks çkIr gqvk FkkA
¹la- ,y&30012@74@2008&vkbZvkj (,e)º
Mh- ds- fgeka'kq] voj lfpo
New Delhi, the 6th August, 2018
S.O. 1189.—In pursuance of Section 17 of the Industrial Disputes Act, 1947 (14 of 1947), the Central
Government hereby publishes the Award (Ref. No. 24/2010) of the Central Government Industrial Tribunal/Labour
Court, Ahmedabad now as shown in the Annexure, in the industrial dispute between the employers in relation to the
management of M/s. O.N.G.C. Ltd. and their workman, which was received by the Central Government on 01.08.2018.
[No. L-30012/74/2008-IR (M)]
D. K. HIMANSHU, Under Secy.
ANNEXURE
BEFORE THE CENTRAL GOVERNMENT INDUSTRIAL TRIBUNAL-CUM-LABOUR COURT,
AHMEDABAD
Present :
Pramod Kumar Chaturvedi,
Presiding Officer, CGIT-cum-Labour Court,
Ahmedabad,
Dated 2nd July, 2018
Reference: (CGITA) No. 24/2010
The General Manager/Surface Manager,
ONGC Ltd.,
KDM Bhavan, Palavasna,
Mehsana (Gujarat)
…First Party
V/s
The General Secretary,
General Mazdoor Sangh,
5082
THE GAZETTE OF INDIA : AUGUST 11, 2018/SRAVANA 20, 1940
[PART II—SEC. 3(ii)]
B/331, Punitnagar,
Nr. Cadila Railway Crossing, Ghodasar,
Ahmedabad (Gujarat)
…Second Party
For the First Party No
:
Shri K.V. Gadhia
For the Second Party
:
Shri Yogesh M. Dave
AWARD
The Government of India/Ministry of Labour, New Delhi by reference adjudication Order No. L-30012/74/2008–
IR(M) dated 17.04.2009 referred the dispute for adjudication to the Industrial Tribunal, Ahmedabad (Gujarat) in respect
of the matter specified in the Schedule:
SCHEDULE
“Whether the action of the management of ONGC, Mehsana in terminating the services of Shri B.B. Patel, Ex. TA
Gr. II (Chem.) is just and legal? What relief the workman is entitled to?”
1.
The reference dates back to 17.04.2009. After issuing notice Ex. 3 to all the parties, the first party submitted the
vakalatpatra Ex. 5 of Shri K.V. Gadhia on 19.03.2012 and the second party submitted the statement of claim Ex. 7 on
19.12.2016 along with vakalatpatra of Shri Yogesh M. Dave. The first party submitted the written statement Ex. 8 on
20.11.2017 and the case was fixed for evidence of second party. But since then the second party has not been leading
evidence and the second party workman has alleged in his statement of claim that he was working as TA Grade II
(Chem.) as a permanent employee and he was charge sheeted for unauthorised long absence. The written statement Ex. 8
indicates that he was absent from duty for more than 851 days. Thus in the light of the aforesaid observations, the
workman has simply dragging the reference as a waste of time of the tribunal.
2.
Thus the reference, in the absence of the evidence of the second party union or its workman, is disposed of with
the observation as under:”the action of the management of ONGC, Mehsana in terminating the services of Shri B.B.
Patel, Ex. TA Gr. II (Chem.) can be said to be just and legal.”
P. K. CHATURVEDI, Presiding Officer
ubZ fnYyh] 6 vxLr] 2018
dk-vk- 1190-—vkS|ksfxd fookn vf/fu;e] 1947 (1947 dk 14) dh èkkjk 17 ds vuqlj.k esa dsUnzh; ljdkj eSllZ vks-,u-
th-lh- fyfeVsM ,oa vU; ds çcaèkra=k ds lac¼ fu;kstdksa vkSj muds deZdkjksa ds chp] vuqcaèk esa fu£n"V vkS|ksfxd fookn esa dsUnzh;
ljdkj vkS|ksfxd vfèkdj.k ,oa Je U;k;ky;] vgenkckn ds iapkV (lanHkZ la[;k 01@2012) dks çdkf'kr djrh gS] tks dsUnzh; ljdkj
dks 01-08-2018 dks çkIr gqvk FkkA
¹la- tsM&16025@4@2018&vkbZvkj (,e)º
Mh- ds- fgeka'kq] voj lfpo
New Delhi, the 6th August, 2018
S.O. 1190.—In pursuance of Section 17 of the Industrial Disputes Act, 1947 (14 of 1947), the Central
Government hereby publishes the Award (Ref. No. 01/2012) of the Central Government Industrial Tribunal/Labour
Court, Ahmedabad now as shown in the Annexure, in the industrial dispute between the employers in relation to the
management of M/s. O.N.G.C. Ltd. and others and their workman, which was received by the Central Government on
01.08.2018.
[No. Z-16025/4/2018-IR (M)]
D. K. HIMANSHU, Under Secy.
ANNEXURE
BEFORE THE CENTRAL GOVERNMENT INDUSTRIAL TRIBUNAL-CUM-LABOUR COURT,
AHMEDABAD
Present :
Pramod Kumar Chaturvedi,
Presiding Officer, CGIT-cum-Labour Court,
Ahmedabad,
Dated 9th July, 2018
Reference: (CGITA) No. 01/2018
¹Hkkx IIµ[k.M 3(ii)º
Hkkjr dk jkti=k % vxLr 11] [email protected] 20] 1940
5083
Brijeshkumar Hariprakash Shukla,
At & Post Block No. 398/2233,
Shivshakti Nagar, G.H.B., Chandkheda,
Ahmedabad (Gujarat)
…Complainant/Applicant
V/s
1.
The Manager,
ONGC Ltd.,
Avani Bhavan, Chandkheda,
Ahmedabad (Gujarat)
2.
The General Manager,
ONGC Ltd. (W.S.S.),
Village Saij, Ta. Kalol,
Gandhinagar (Gujarat)
3.
The Manager,
M/s Vijay Security Services,
33, Patel Chambers, 1st Floor,
Highway Road, Bapunagar,
Ahmedabad (Gujarat)
…Respondents/Opposite Party
For the Complainant
: Shri K.K.Rathod
For the Respondent
: Shri K.V. Gadhia
ORDER
1.
This is a complaint Ex. 1 moved by the complainant Brijeshkumar Hariprakash Shukla under Section 33 A of
Industrial Disputes Act for reinstatement with back wages from the date of termination with all benefits as per Central
Labour Rules and Regulations alleging that he has been working as W.S.S. in ONGC Ltd. (W.S.S.), Village Saij, Ta.
Kalol, Gandhinagar, since 1994 as Accounts Clerk and his salary was as per ONGC rules. He served his duties honestly
and regularly. ONGC Officers used to take his attendance. Despite no notice or departmental enquiry, ONGC and
contractor terminated his service on 26.07.2005, therefore, he has prayed for aforesaid reliefs.
2.
The respondents no. 1, 2 and 3 The Manager, ONGC Ltd., Avani Bhavan, Chandkheda, Ahmedabad (Gujarat),
The General Manager, ONGC Ltd. (W.S.S.),Village Saij, Ta. Kalol, Gandhinagar (Gujarat) and The Manager, M/s Vijay
Security Services,33, Patel Chambers, 1st Floor, Highway Road, Bapunagar, Ahmedabad (Gujarat) respectively, were
issued notice. In response to the notice, the respondents no. 1 and 2 submitted the written statement Ex. 8 alleging that
the workman/applicant was a contractual employee under the opposite party/respondent no. 3 M/s Vijay Security
Services. There was no master servant relationship with the ONGC. The workman/applicant himself has admitted that he
was employed by the contractor; therefore, he cannot be reinstated by ONGC.
3.
The opposite party no. 3 The Manager, M/s Vijay Security Services, 33, Patel Chambers, 1st Floor, Highway
Road, Bapunagar, Ahmedabad (Gujarat) has not filed the reply as the notices served to him were received as unserved.
Therefore, in the absence of the reply and evidence of the opposite party no. 3 M/s Vijay Security Services as the
applicant has reiterated the averments made in the application in his affidavit Ex. 11, the complaint may be disposed of as
ex-parte against the opposite party no. 3 ordering the reinstatement of the applicant/complainant Brijeshkumar
Hariprakash Shukla in the service of the opposite party no. 3 M/s Vijay Security Services from the date he report for
duty.
4.
In the absence of the master servant relationship, no relief can be granted against the opposite party no. 1 and 2.
5.
The order is passed accordingly.
P. K. CHATURVEDI, Presiding Officer
ubZ fnYyh] 6 vxLr] 2018
dk-vk- 1191-—vkS|ksfxd fookn vf/fu;e] 1947 (1947 dk 14) dh èkkjk 17 ds vuqlj.k esa dsUnzh; ljdkj eSllZ
dk.Myk MkWd yscj cksMZ ,oa vU; ds çcaèkra=k ds lac¼ fu;kstdksa vkSj muds deZdkjksa ds chp] vuqcaèk esa fu£n"V vkS|ksfxd fookn esa
dsUnzh; ljdkj vkS|ksfxd vfèkdj.k ,oa Je U;k;ky;] vgenkckn ds iapkV (lanHkZ la[;k 38@2006) dks çdkf'kr djrh gS] tks dsUnzh;
ljdkj dks 01-08-2018 dks çkIr gqvk FkkA
¹la- ,y&37011@1@2002&vkbZvkj (,e)º
Mh- ds- fgeka'kq] voj lfpo
5084
THE GAZETTE OF INDIA : AUGUST 11, 2018/SRAVANA 20, 1940
[PART II—SEC. 3(ii)]
New Delhi, the 6th August, 2018
S.O. 1191.—In pursuance of Section 17 of the Industrial Disputes Act, 1947 (14 of 1947), the Central
Government hereby publishes the Award (Ref. No. 38/2006) of the Central Government Industrial Tribunal/Labour
Court, Ahmedabad now as shown in the Annexure, in the industrial dispute between the employers in relation to the
management of M/s. Kandla Doc Labour Board and other and their workman, which was received by the Central
Government on 01.08.2018.
[No. L-37011/1/2002-IR (M)]
D. K. HIMANSHU, Under Secy.
ANNEXURE
BEFORE THE CENTRAL GOVERNMENT INDUSTRIAL TRIBUNAL-CUM-LABOUR COURT,
AHMEDABAD
Present :
Pramod Kumar Chaturvedi,
Presiding Officer, CGIT-cum-Labour Court,
Ahmedabad,
Dated 17th July, 2018
Reference: (CGITA) No. 38/2006
1.
The Vice President,
Kandla Stevedores Association Limited,
10, Seva Sadan-I, New Kandla,
Kutch (Gujarat) – 370210
2.
The Deputy Chairman,
Kandla Dock Labour Board,
Shram Deep, Kandla Port,
Kutch (Gujarat) – 370210
…First Party
V/s
The President,
Kandla Port & Dock SC/ST Employees’ Union,
S.G.X. 36-37, Adipur,
Kutch (Gujarat) –370205
…Second Party
For the First Party
:
None
For the Second Party
:
None
AWARD
The Government of India/Ministry of Labour, New Delhi by reference adjudication Order No. L-37011/1/2002–
IR(M) dated 24.03.2006 referred the dispute for adjudication to the Central Govt. Industrial Tribunal, Ahmedabad
(Gujarat) in respect of the matter specified in the Schedule:
SCHEDULE
“Whether the demand made by Kandla Port & Dock SC/ST Employees’ Union for employment of 328 NOC
workers by the Kandla Stevedores Association Limited in the Kandla Dock Labour Board at par with the 240
NOC workers already engaged is legal and justified? If so, what relief the workmen concerned are entitled to?”
1.
The reference dates back to 24.03.2006 and received on 01.04.2006 from Ministry of Labour and Employment,
New Delhi for adjudication. The second party submitted the statement of claim Ex. 15 alleging that the first party
employer has been engaging workers for loading and unloading on the Ships/Steamers which are permanently coming
and going to various countries. The Kandla Stevedores Association Limited, has employed 328 NOC workers in the
employment for taking work from them in Kandla Port. Since long, more than 240 NOC workers were already engaged
through legal process by Kandla Port and it has to allow further 328 NOC worker to continue to work on Kandla Dock
Labour Board. These 328 NOC workers worked for more than 340/240 days in each calendar year. Therefore, it has been
prayed that all the workers be considered at par with the 240 NOC workers already engaged and they also be paid wages.
2.
The first party submitted the written statement Ex. 21 alleging that the reference is time barred and bad in law.
There was no master servant relationship between the workmen and the first party management, therefore, no relief can
be granted. The reference is too old as referred to the Tribunal on 24.03.2006 but since the filing of written statement on
¹Hkkx IIµ[k.M 3(ii)º
Hkkjr dk jkti=k % vxLr 11] [email protected] 20] 1940
5085
10.12.2015, the second party has not led evidence despite giving dozens of opportunities. It is also noteworthy that the
Tribunal passed an order on 05.01.2017 that no further opportunity shall be granted but even then after giving dates on
16.02.2017, 17.04.2017, 01.08.2017, 12.09.2017, 14.11.2017, 12.12.2017, 13.02.2018, 10.04.2018 and today on
17.07.2018, the second party union did not come forward to lead evidence.
3.
Thus it appears that the second party union or its workmen are not willing to prosecute the reference.
4.
Thus the reference is disposed of in the absence of the evidence of the second party union or its workmen with the
observation as under: “the demand made by Kandla Port & Dock SC/ST Employees’ Union for employment of 328 NOC
workers by the Kandla Stevedores Association Limited in the Kandla Dock Labour Board at par with the 240 NOC
workers already engaged is illegal and unjustified.”
P. K. CHATURVEDI, Presiding Officer
ubZ fnYyh] 6 vxLr] 2018
dk-vk- 1192-—vkS|ksfxd fookn vf/fu;e] 1947 (1947 dk 14) dh èkkjk 17 ds vuqlj.k esa dsUnzh; ljdkj eSllZ vks-,u-
th-lh- fyfeVsM ds çcaèkra=k ds lac¼ fu;kstdksa vkSj muds deZdkjksa ds chp] vuqcaèk esa fu£n"V vkS|ksfxd fookn esa dsUnzh; ljdkj
vkS|ksfxd vfèkdj.k ,oa Je U;k;ky;] vgenkckn ds iapkV (lanHkZ la[;k 147@2006) dks çdkf'kr djrh gS] tks dsUnzh; ljdkj dks
01-08-2018 dks çkIr gqvk FkkA
¹la- ,y&30011@54@2005&vkbZvkj (,e)º
Mh- ds- fgeka'kq] voj lfpo
New Delhi, the 6th August, 2018
S.O. 1192.—In pursuance of Section 17 of the Industrial Disputes Act, 1947 (14 of 1947), the Central
Government hereby publishes the Award (Ref. No. 147/2006) of the Central Government Industrial Tribunal/Labour
Court, Ahmedabad now as shown in the Annexure, in the industrial dispute between the employers in relation to the
management of M/s. O.N.G.C. Ltd. and their workman, which was received by the Central Government on 01.08.2018.
[No. L-30011/54/2005-IR (M)]
D. K. HIMANSHU, Under Secy.
ANNEXURE
BEFORE THE CENTRAL GOVERNMENT INDUSTRIAL TRIBUNAL-CUM-LABOUR COURT,
AHMEDABAD
Present :
Pramod Kumar Chaturvedi,
Presiding Officer, CGIT-cum-Labour Court,
Ahmedabad,
Dated 19th July, 2018
Reference: (CGITA) No. 147/2006
1.
The Chairman,
ONGC Ltd., Tel Bhavan,
Dehradun (Uttrakhand)
2.
The Asset Manager,
ONGC Ltd.,
5th Floor, AvaniBhawan, Chandkheda,
Ahmedabad (Gujarat)
…First Party
V/s
Shri Naresh I. Parmar and 11 others,
Through
The General Secretary,
Kamdar Utkarsh Parishad, Ratilal-ni-Chali, Behind Kalyan,
Mahavir Nagar, Naroda Road,
Ahmedabad (Gujarat)
…Second Party
For the First Party
:
Shri K.V. Gadhia
5086
THE GAZETTE OF INDIA : AUGUST 11, 2018/SRAVANA 20, 1940
[PART II—SEC. 3(ii)]
For the Second Party
:
Shri A.N. Patel
AWARD
The Government of India/Ministry of Labour, New Delhi by reference adjudication Order No. L-30011/54/2005–
IR(M) dated 12.07.2006 referred the dispute for adjudication to the Industrial Tribunal, Ahmedabad (Gujarat) in respect
of the matter specified in the Schedule:
SCHEDULE
“Whether the contract awarded by the management of ONGC Ltd., in the name of M/s Modern Multi Purpose
Co-operative Society Ltd., was sham and bogus contract and whether the Industrial Dispute raised by the
workmen vide their representation dated 04.08.2005 against the management of ONGC justified? If so, to
what relief the workmen are entitled?”
1.
The reference dates back to 12.07.2006 and received on 07.08.2006 from Ministry of Labour and Employment,
New Delhi for adjudication. After issuing notice to both the parties, the second party union submitted the statement of
claim Ex. 6. Initially the dispute was raised by Kamdar Utkarsh Parishad but the workers were represented by Gujarat
Mazdoor Sabha, hereinafter referred to as “union”. The statement of claim reveals that the workers were appointed by the
first party The Chairman, ONGC Ltd., Tel Bhavan, Dehradun (Uttrakhand) and The Asset Manager, ONGC Ltd., 5th
Floor, AvaniBhawan, Chandkheda, Ahmedabad (Gujarat), hereinafter referred to as “ONGC” in its reservoir sub-division
of Exploration Business Group. Their services were terminated orally on 05.09.1988 by ONGC on the ground of contract
being expired on 15.08.1988. The second party further alleged that the workmen were appointed by the first party as
contingent labour on permanent basis in pursuance of a personal interview being taken by the officers of ONGC.
Thereafter, they were asked to work in Exploration Business Group. They have further alleged that the work which they
used to perform was of permanent nature and they were performing the said work continuously from the date of their
appointment. It is further alleged that one of the workmen Y.A. Kadri was working as Winch Operator and others as
helpers and these workmen used to perform their duties on Winch machine under the senior officers of ONGC. They
have further alleged that they have continuously worked till 05.09.1988. Thereafter, the first party ONGC refused to
continue their services. It is further alleged that in view of the illegal action of the first party, the second party workmen
filed a Special Civil Application (SCA) No. 5893/1988 in the Hon’ble High Court of Gujarat wherein the Hon’ble High
Court granted interim relief and directed on 05.09.1988 to the contractor Bansidhar Majoor Kamdar Sahakari Mandli
Limited to maintain status quo. But the contractor did not obey the order of the Hon’ble High Court and demanded Rs.
500/- as donation from each petitioner. They have further alleged that on demand of Rs. 500/- by the contractor, they
again filed a fresh SCA No. 7200/1988 in the Hon’ble High Court of Gujarat wherein the Hon’ble High Court stopped
the contractor Bansidhar Majoor Kamdar Sahakari Mandli Limited not to demand Rs. 500/- as donation. The Hon’ble
High Court further directed not to enter into any contract on the expiry of contract on 15.11.1988 with any other
contractor unless the new contractor agrees to give the workmen to be engaged. The said order was challenged by the
first party ONGC before the Hon’ble Supreme Court vide S&P No. 16576/1988 which ended into dismissal by the
Hon’ble Supreme Court. It is further alleged that despite the High Court’s aforesaid orders, the contractors and ONGC
did not prefer to engage the workmen despite continuity of the work. The first party ONGC created a camouflage with a
view to deny the employment by creating fresh paper arrangement. It is further alleged that that the union raised the
dispute of regularisation which was numbered as Reference (ITC) No. 101/1999 which was dismissed by the State
Tribunal on the ground that the services of the workmen were terminated on 05.09.1988, therefore, the order of
regularisation cannot be passed as per the settled law. Against the said action, the second party union approached the
Hon’ble High Court vide SCA No. 9334/2004 but the same was dismissed by the Hon’ble High Court keeping the right
of the second party to challenge the termination order open. The second party union has further alleged that the workmen
worked for more than 240 days; hence, they were entitled for the protection given under the Industrial Disputes Act. The
second party union further alleged that it was the case of the union before the State Tribunal that the second party
workmen were employees of Modern Multipurpose Labour Co-operative Society since February, 1988; therefore, the
action of ONGC was contrary to the provisions of Section 25 F, G, H and N of the Industrial Disputes Act. It is further
alleged that the workmen initially were working under ONGC and subsequently, their engagement were transferred to
the contractor, thus the said action of ONGC was violative of Section 9 A of the Industrial Disputes Act. They have
further alleged that the services of the second party workmen were terminated with a view to deprive their right of
regularisation. It is noteworthy that the Government of India has prohibited the contract system for the post of Operator
and Helper in the year 1994, thus the action of the ONGC amounted to be unfair labour practice. In the light of the
aforesaid averments, the second party has prayed for their reinstatement on their original post with continuity of their
service with full benefits treating them as regular employees of ONGC.
2.
The first party ONGC submitted joint written statement Ex. 8 denying the averments made in the statement of
claim submitting that the reference is vague, barred by delay and latches and also barred by non-joinder and mis-joinder
of the necessary parties. The ONGC also submitted that the reference has been moved for the first time in the year 2006
into the matter while the termination of workmen was done in the year 1988, hence after expiry of 18 years and as per the
settled law, the workmen cannot prayed for reinstatement. It is further submitted that at the relevant time, the workmen
¹Hkkx IIµ[k.M 3(ii)º
Hkkjr dk jkti=k % vxLr 11] [email protected] 20] 1940
5087
were working with the contractor and were also terminated by the contractor; therefore, the question does not arise to call
them as workers of ONGC. It is further submitted that the workers were not engaged, deployed or supervised by ONGC;
therefore, master servant relationship does not exist between them. It is further submitted that ONGC has its rules and
procedures regarding the recruitment of the employees which is not proved to be followed, therefore, reinstatement, if
ordered, would amount to back door entry and also against the settled principle of law. It is further submitted that the
workmen were not working under prohibit category and there was a contract between ONGC and contractor registered
under Section 7 of CLRA Act, 1970 for which the contractor obtained the licence under Section 12 of the aforesaid act.
Thus the reference has no force and liable to be dismissed and no relief can be granted.
3.
The second party union submitted the documentary evidences vide Ex. 9 and 12 and examined workmen vide
Ex. 10, 13 to 23 and the first party submitted documents vide Ex. 25 and also examined the witness vide Ex. 28.
4.
On the basis of the pleadings of the parties, the following issues are to be decided:
I.
Whether the contract awarded by the management of ONGC Ltd., in the name of M/s Modern Multi-
Purpose Co-operative Society Ltd., was sham and bogus contract?
II.
Whether the industrial dispute raised by the workmen vides their representation dated 04.08.2005 against
the management of ONGC justified?
III.
To what relief, if any, the workmen are entitled?
5.
Issue No. I, II & III: All the issues are interrelated, therefore, decided together. The burden of prove of these
issues was lying on the second party union. The second party union examined their witness vide affidavit Ex. 10 and
Ex. 13 to 23. All the witnesses reiterated the averments made in the statement of claim Ex.6. They were cross-examined
by the first party and they reiterated that they were not appointed and supervised by the contractor and they have also
worked for more than 240 days in each calendar year. What also appears from the cross-examination is that all the
workmen were having different educational qualifications and were not issued any appointment letter by ONGC. After
termination, they are doing some remunerative work and also they have crossed the superannuation age. They do not
have any proof with them regarding their employment directly under the supervision of ONGC with a master servant
relationship. They have also admitted that they have been paid wages on the daily wage basis. From the pleadings and
evidences, undisputed facts emerged out that all the workmen were terminated in 1988 and cause of action arose
immediate thereafter but the present dispute was raised in the year 2004 and 2005 before the Labour Enforcement. It is
true that there were litigation pending between them before various forums like High Court but the dispute regarding the
termination was never referred or adjudicated while it is the duty of the second party to remain cautious and vigilant
regarding their case. The second party union earlier approached the Hon’ble High Court who diverted the matter to seek
relief from the Industrial Tribunal. Thus delay has been caused due to the mistake of the second party union.
6.
Secondly, as per the documents relating to Reference (ITC) No. 101/1999 produced by the second party, it
appears that all the workmen joined the employment in 1986 and 1987 with a tenure of only 15 months and after
reference of this dispute, the statement of claim was filed in the year in 2008 that too after delay of 2 years when the
matter is referred to this tribunal in the year 2006. Thirdly, the case of the second party union is that the workmen were
terminated after completion of contract but the Hon’ble High Court directed the contractor to maintain status quo and
after grant of status quo, contractor did not prefer to reinstate them and tried to exhort Rs.500/- per person for moving
SCA in High Court for seeking relief against ONGC. It appears that the contractor and workmen’s union were in
collision. It is also noteworthy that the second party workmen were terminated by the contractor but they preferred to
seek relief declaring termination illegal and to treat them as employees of ONGC. In terms of the reference, the Tribunal
has to decide as to whether the contract was sham or bogus or not, for that, contractor ought to be necessary and proper
party.
7.
As discussed above, the second party union is praying for reinstatement with regularisation on the ground that
they were doing work of permanent nature and were supervised by ONGC and it was their case that the contractor was a
formality. It is noteworthy that the workmen were terminated in the year 1988 against which they approached the
Hon’ble High Court and Hon’ble High Court granted status quo till the disposal of the petition but it is surprising that the
contractor instead of reinstating them, tried to exhort Rs.500/- as donation. The union again approached the Hon’ble High
Court against the said contractor’s conduct and the Hon’ble High Court restrained the contractor to do so. Thus it clearly
establishes that the workmen were the employees of the contractor.
8.
The second party workers in their evidence stated that personal interview/personality test were conducted by
ONGC prior to their appointment but no such interview call letters or appointment letters are submitted by the second
party union. No evidence regarding advertisement of vacancies, non-employee I-Card, temporary pass, office order of
collecting the keys is filed. Thus the workmen’s union has failed to establish that the work was of permanent nature and
the workmen were supervised and controlled by ONGC.
9.
All the workmen examined vide affidavits Ex. 10 and Ex. 13 to 23 and they admitted that they were not given any
appointment letter by ONGC. They were paid by the contractor on daily wage basis. They were gainfully employed to
5088
THE GAZETTE OF INDIA : AUGUST 11, 2018/SRAVANA 20, 1940
[PART II—SEC. 3(ii)]
sustain their families and also worked under the contractor named Modern Multipurpose Society and Bansidhar Majoor
Kamdar Sahakari Mandli Limited. All the witnesses have also admitted regarding the Hon’ble High Court proceedings as
discussed earlier but the second party union did not prefer to submit those orders passed by the Hon’ble High Court. All
these witnesses have not submitted their passbooks of the banks regarding their crediting of wages despite promising to
submit. They have also different age and qualification and all have passed the superannuation age as admitted by the
advocate of the second party while submitting his arguments. They have also admitted that they were engaged and also
terminated by the contractor. They have also not submitted any proof which may establish to work for more than
240 days in any calendar year.
10.
The first party ONGC vide list Ex. 25 submitted the copies of the licences of the contractors, agreement,
registration of the contractor to establish the worthiness of the contractor between the ONGC and the concerned
contractor.
11.
The first party has relied upon the depositions of the workmen examined in Reference (ITC) No. 101/1999
wherein it is stated that there are rules and regulations for appointment in ONGC and appointment are always made as
per the rules. Names of probable candidates are called from Employment Exchange and then after checking the details,
call letters are issued, test is taken and interviews are conducted, thereafter the merit list is prepared for issuing
appointment letters to the successful candidates. The medical examination was also done and after passing the medical
examination, they were permitted to join and proper identity cards are issued. But no such appointment letter was issued
to any of these workmen. It was also deposed that all the persons were appointed by ONGC and were terminated by one
Mr. Gupta. It was also denied that the workers have been working as per the instructions of ONGC. But the workmen did
not tried to rebut the entire procedure as explained above.
12.
At the time of the argument, the second party advocate submitted that the concerned workmen were appointed and
terminated by ONGC but looking to the affidavits filed by the workmen, it has not been explained by them in their
deposition. It is also noteworthy that the concerned workmen approached the Tribunal vide Reference (ITC)
No. 101/1999 and after hearing both the parties, the Tribunal deciding the reference on merits, rejecting the relief sought
by the workmen and also dismissed the reference. The second party union approached the Hon’ble High Court against
the said order and the matter was relegated to this Tribunal for adjudication.
13.
As per the submissions of the second party workmen, they have worked for a short spam of period in the year
1987 and 1988 as daily rated workmen and they all have crossed the superannuation age. It is also not under dispute that
their services were terminated by the contractor and the contractor has not been impleaded as the necessary party.
14.
The second party union’s advocate Shri Amrish Patel stated that the Evidence Act is not applicable in the cases
under Industrial Disputes Act belying the fact that the zerox copies of the documents produced by the second party union
are very much admissible in evidence. He has also submitted that the workmen were earlier engaged by ONGC and later
their services were transferred to the contractor which is a change in service condition, hence the action of ONGC was
violative of provisions of Section 9 A of Industrial Disputes Act and ONGC did not issue any notice under aforesaid
section before transferring the workmen from ONGC to contractor. But no such evidence has been produced as when
these workmen were recruited by the ONGC as per the procedure discussed earlier.
15.
The first party the ONGC has relied upon several judgments in support of its submissions which are as under:
I.
The Hon’ble Supreme Court in a case of Vice Chancellor, Lucknow University, Lucknow V/s Akhilesh
Kumar Khare & others, 2015 III CLR 464, held that the Courts cannot issue any direction for absorption /
regularization of temporary, contractual, casual, daily wage or ad-hoc employees.
II.
The Hon’ble Supreme Court in case of Account Officer (A&I) APSRTC & Ors. V/s K.V. Ramana & Ors.,
2007 LLR 338, held that contractual workers who have completed 240 days without any break cannot be
regularized dehors the rules of selection as they had not undergone the departmental selection process.
III.
The Hon’ble Supreme Court in a landmark judgment of Dena Nath and Ors., 1992 (64) FLR 39, held that
the CLRA Act merely regulates the employment of contract labour in certain establishment and provides
for its abolition in certain circumstances. Non compliance of the provisions only exposes to prosecution but
the contract labour employee does not become direct employees of principal employer.
IV.
The Hon’ble Supreme Court in case of Steel Authority of India Ltd. and Ors., 2001 (2) SCSLJ=2001 LLR
961 also laid down a ratio which is reproduced as under:
“Neither Section 10 of the CLRA Act nor any other provision in the Act, whether expressly or by
necessary implication, provides for automatic absorption of contract labour on issuing a notification by
Appropriate Government under sub section (1) of Section 10, prohibiting employment of contract labour,
in any process, or other work in any establishment. Consequently the principal employer cannot be
required to order absorption of the contract labour working in the concerned establishment.”
¹Hkkx IIµ[k.M 3(ii)º
Hkkjr dk jkti=k % vxLr 11] [email protected] 20] 1940
5089
V.
In case of Union of India & Anr. V/s Ramsingh Thakor & Ors., 2012 AIR SCW 3806, the Apex Court held
that regularization of services is an executive function and such direction cannot be given by the Judiciary.
VI.
Hon’ble Apex Court in case of Balvant Rai Saluja & Anr. V/s Air India Ltd. & Ors., 2014 III CLR 751,
held that contractual workers working in statutory canteen as per the Factories Act who are under certain
degree of control of the Principal Employer also cannot claim regularization as there is no parity in the
nature of work, mode of appointment, qualification etc. between regular employees of the partly employer
and concerned persons.
VII.
The Division Bench of Hon’ble High Court of Gujarat in LPA No. 530 in case of Jhon Peter Farnandiz also
held that as per the position of law settled by the Hon’ble Apex Court in various judgments contractual
workers have not undergone the selection process and therefore they cannot claim regularization.
VIII. The Hon’ble Division Bench of Gujarat High Court in Hadvad Nagar Palika held that compliance of
Section 25 F is also not required in case of daily wages.
IX.
The Hon’ble High Court of Gujarat in LPA No. 2038/2004 in case of Shukla M.P. V/s Municipal
Commissioner, held that once the concerned person has not followed the selection process, he cannot be
entitled for regularization.
X.
In case of latest judgment of Gujarat high court in case of ONGC itself of Shri Chetan Kumar Patel and
Others, 2016 III CLR Page 106, had prayed for regularization with ONGC. The Hon’ble High Court has
after considering the judgment of Constitution Bench of Umadevi, 2006 II CLR 261, Indian Drugs
Pharmaceuticals, Kendriya Vidya Sangathan, U.P. State Electricity Board, Official Liquidator V/s
Dayanand etc. held that
•
If it were an engagement or appointment on daily wages or casual basis, the same would come to an
end when it is discontinued.
•
Merely because a temporary employee or a casual wage worker is continued for a time being
beyond the term of his appointment, he would not be entitled to be absorbed in regular service or
made permanent, merely on the strength on such continuance, if the original appointment was not
made by following a due process of selection as envisaged by the relevant rules.
•
Regularisation is not a mode of appointment.
•
The Government or the instrumentality of the State cannot regularize the appointment made
contrary to the course of selection as envisaged by the relevant rules governing the posts.
•
The High Court acting under Article 226 of the Constitution of India should not issue directions for
regularization or permanent continuance unless the recruitment itself was made regularly and in
terms of the constitutional scheme.
•
There should be no further by-passing of the constitutional requirement and regularization or
making permanent those not duly appointed as per the constitutional scheme. [vide Shilpa Jinda
(supra)]
XI.
The Hon'ble Apex Court after the constitution bench judgment in Umadevi held in 2010 in case of State of
Karnataka & Ors. V/s Gadilingappa and Ors. that any judgment / direction contrary to the directions given
in Umadevi’s case [2006(4) SCC 1] shall not have a precedent status.
XII.
The Hon'ble Allahabad High Court in case of M/s. NTPC Ltd., 2015 (144) FLR 248, held that Contractor
is a necessary party and any reference cannot stand unless the contractor is impleaded.
XIII. In case of latest judgment delivered by the Hon'ble Apex Court in case of Upendra Singh V/s State of
Bihar & Ors., 2018 I CLR 1043, considering the landmark judgment of Umadevi, held that unless the entry
is made duly accepted procedure of public advertisement, selection of employees as per norms fixed and
against the sanctioned posts etc one is not entitled to get the relief of regularization in service.
16.
The second party advocate relied on ONGC V/s Petroleum Coal Labour Union, 2015 (6)SC C 494, wherein the
apex court held that the workmen cannot be denied their legitimate, statutory and fundamental right to be regularised on
the basis that ONGC did not follow the due procedure as provided under the Clause 2 (2) of the ONGC Certified
Standing Orders appointing them as temporary workmen and continuing them as such for a number of periods though
they were entitled for regularisation under aforesaid order would amounts to unfair labour practice. He has further relied
upon workmen of FCI V/s FCI, AIR 1985 SC 670, wherein it has been held that FCI applied different procedures for
engagement at different establishment and abolition of contract system without issuing notice with a cancellation of
direct payment system and re-introducing contract system is punishable under Section 31 (2) of Industrial Disputes Act.
He has further relief on State of Uttar Pradesh V/s Om Pal Singh, 2006 SLP (C) 5189, wherein the apex court has held as
5090
THE GAZETTE OF INDIA : AUGUST 11, 2018/SRAVANA 20, 1940
[PART II—SEC. 3(ii)]
under: “The engagement of the first respondent was for only a particular project cannot be appreciated at all. We
therefore do not find any ground to interfere with the well-reasoned award passed by the Industrial Tribunal and as
endorsed by the High Court. However, we do not find it proper in the facts of the case to sustain the award of back wages
in the facts of the present case. Therefore, the award is modified only to the extent that the first respondent shall not be
entitled for back wages for the period he was not actually in service and for all other purposes his services shall be treated
as continuous.”
17.
In the light of the aforesaid discussions, it is an admitted fact that all the workmen were engaged by the contractor
and have also passed the superannuation age and the dispute has been raised after 18 years, therefore, it is not equitable
to reinstate them with back wages and other benefits, however, it would be appropriate to pay Rs. 150000/- (Rupees One
Lac Fifty Thousand) as lump-sum to each workman.
18.
Thus the reference is decided accordingly. The first party ONGC is directed to pay the aforesaid amount to all the
workmen concerning this reference within 60 days from the publication of the award.
P. K. CHATURVEDI, Presiding Officer
ubZ fnYyh] 6 vxLr] 2018
dk-vk- 1193-—vkS|ksfxd fookn vf/fu;e] 1947 (1947 dk 14) dh èkkjk 17 ds vuqlj.k esa dsUnzh; ljdkj eSllZ vks-,u-
th-lh- fyfeVsM ds çcaèkra=k ds lac¼ fu;kstdksa vkSj muds deZdkjksa ds chp] vuqcaèk esa fu£n"V vkS|ksfxd fookn esa dsUnzh; ljdkj
vkS|ksfxd vfèkdj.k ,oa Je U;k;ky;] vgenkckn ds iapkV (lanHkZ la[;k 09@2016) dks çdkf'kr djrh gS] tks dsUnzh; ljdkj dks 01-
08-2018 dks çkIr gqvk FkkA
¹la- ,y&30011@39@2015&vkbZvkj (,e)º
Mh- ds- fgeka'kq] voj lfpo
New Delhi, the 6th August, 2018
S.O. 1193.—In pursuance of Section 17 of the Industrial Disputes Act, 1947 (14 of 1947), the Central
Government hereby publishes the Award (Ref. No. 09/2016) of the Central Government Industrial Tribunal/Labour
Court, Ahmedabad now as shown in the Annexure, in the industrial dispute between the employers in relation to the
management of M/s. O.N.G.C. Ltd. and their workman, which was received by the Central Government on 01.08.2018.
[No. L-30011/39/2015-IR (M)]
D. K. HIMANSHU, Under Secy.
ANNEXURE
BEFORE THE CENTRAL GOVERNMENT INDUSTRIAL TRIBUNAL-CUM-LABOUR COURT,
AHMEDABAD
Present :
Pramod Kumar Chaturvedi,
Presiding Officer, CGIT-cum-Labour Court,
Ahmedabad,
Dated 17th July, 2018
Reference: (CGITA) No. 09/2016
1.
The Executive Director – Asset Manager,
ONGC Ltd.,AvaniBhavan, 5th Floor, Chandkheda,
Ahmedabad (Gujarat)
2.
The Incharge (HR - IR),
ONGC Ltd.,AvaniBhavan, 5th Floor, Chandkheda,
Ahmedabad (Gujarat)
3.
The Dy. General Manager (P) ST,
ONGC Ltd.,AvaniBhavan, 5th Floor, Chandkheda,
Sabarmati, Ahmedabad
4.
M/s D.B. Enterprises,
G-8, Sukan Mall, Behind Vishat Petrol Pump,
Sabarmati, Ahmedabad (Gujarat)
…First Party
V/s
¹Hkkx IIµ[k.M 3(ii)º
Hkkjr dk jkti=k % vxLr 11] [email protected] 20] 1940
5091
The President,
Glorious Petroleum MazdoorSangh,
A/3, PriyaDarshini Society,Near New Railway Colony,
Ahmedabad (Gujarat) – 380019
…Second Party
For the First Party
:
None
For the Second Party
:
None
AWARD
The Government of India/Ministry of Labour, New Delhi by reference adjudication Order No. L-30011/39/2015–
IR(M) dated 15.01.2016 referred the dispute for adjudication to the Central Govt. Industrial Tribunal, Ahmedabad
(Gujarat) in respect of the matter specified in the Schedule:
SCHEDULE
“Whether the action of the management of ONGC Ltd., Ahmedabad through its contractor M/s D.B.
Enterprises, Ahmedabad in discontinuing/terminating the services of two workmen Shri Mangaji J. Yadav
w.e.f. 28.04.2015 without following the procedure prescribed under Section 33 of the I.D. Act, 1947 during
the pendency of his claim for regularization in services of ONGC Ltd., before CGIT, Ahmedabad and Shri
Pradipkumar S. Nai without following the procedure prescribed under ‘Fair Wage Settlement’ is legal, proper
and justified? If not, to what relief the concerned workmen S/Shri Mangaji J. Yadav and Pradipkumar S. Nai
are entitled to and what directions are necessary in the matter?”
1.
The reference dates back to 15.01.2016 and received on 23.01.2016 from Ministry of Labour and Employment,
New Delhi for adjudication. The first party ONGC has submitted a copy of the award Ex. 6 passed in Reference
(CGITA) No. 11/2016 which was disposed of on 21.11.2017 directing the contractor M/s D.B. Enterprise to
engage/employ the workman namely Mangaji J. Yadav and Pradipkumar S. Nai immediately as and when they report for
duty.
2.
The schedule of the reference in the present reference is completely same and details of the letter of the reference
are also same.
3.
Thus this reference amounts to be duplicity of the dispute. Thus this reference is not maintainable being repetition
of the earlier reference.
4.
Thus no final award is required and the reference is disposed of accordingly.
P. K. CHATURVEDI, Presiding Officer
ubZ fnYyh] 6 vxLr] 2018
dk-vk- 1194-—vkS|ksfxd fookn vf/fu;e] 1947 (1947 dk 14) dh èkkjk 17 ds vuqlj.k esa dsUnzh; ljdkj eSllZ vks-,u-
th-lh- fyfeVsM ds çcaèkra=k ds lac¼ fu;kstdksa vkSj muds deZdkjksa ds chp] vuqcaèk esa fu£n"V vkS|ksfxd fookn esa dsUnzh; ljdkj
vkS|ksfxd vfèkdj.k ,oa Je U;k;ky;] vgenkckn ds iapkV (lanHkZ la[;k 242@2004) dks çdkf'kr djrh gS] tks dsUnzh; ljdkj dks
01-08-2018 dks çkIr gqvk FkkA
¹la- ,y&30011@36@1999&vkbZvkj (,e)º
Mh- ds- fgeka'kq] voj lfpo
New Delhi, the 6th August, 2018
S.O. 1194.—In pursuance of Section 17 of the Industrial Disputes Act, 1947 (14 of 1947), the Central
Government hereby publishes the Award (Ref. No. 242/2004) of the Central Government Industrial Tribunal/Labour
Court, Ahmedabad now as shown in the Annexure, in the industrial dispute between the employers in relation to the
management of M/s. O.N.G.C. Ltd. and their workmen, which was received by the Central Government on 01.08.2018.
[No. L-30011/36/1999-IR (M)]
D. K. HIMANSHU, Under Secy.
5092
THE GAZETTE OF INDIA : AUGUST 11, 2018/SRAVANA 20, 1940
[PART II—SEC. 3(ii)]
ANNEXURE
BEFORE THE CENTRAL GOVERNMENT INDUSTRIAL TRIBUNAL-CUM-LABOUR COURT,
AHMEDABAD
Present :
Pramod Kumar Chaturvedi,
Presiding Officer, CGIT-cum-Labour Court,
Ahmedabad,
Dated 3rd July, 2018
Reference: (CGITA) No. 242/2004
The Group General Manager (P),
ONGC Ltd.,
Ahmedabad Project, Avani Bhawan,
Ahmedabad (Gujarat) – 380005
…First Party
V/s
The General Secretary,
General Mazdoor Sabha,
Divetia Blocks, Raikhad,
Ahmedabad (Gujarat)
…Second Party
For the First Party No
:
Shri K.V. Gadhia
For the Second Party
:
Shri Raghuvir Mali
AWARD
The Government of India/Ministry of Labour, New Delhi by reference adjudication Order No. L-30011/36/99–
IR(M) dated 17.11.1999 referred the dispute for adjudication to the Industrial Tribunal, Ahmedabad (Gujarat) in respect
of the matter specified in the Schedule:
SCHEDULE
“Whether the demand of General Mazdoor Sabha that the so called contract under which the employees Shri
Zala Govindbhai Mangalsinh and 21 others in the various department of ONGC Ahmedabad Project ‘sham’
and ‘bogus’ arrangement and the concerned employees be treated in direct employment in ONGC Ahmedabad
Project from their date of engagement with all consequential benefits through the so called contractors is legal
and justified? If so, to what relief the concerned workmen are entitled and from which date?”
1.
The reference dates back to 17.11.1999. The second party submitted the statement of claim Ex. 5 on 15.03.2000
alleging that the second party union The General Secretary, General Mazdoor Sabha, Divetia Blocks, Raikhad,
Ahmedabad, hereinafter referred to as “union”, has right to raise the dispute concerning the workmen who are members
of the union. The union is active in trade union activities with the first party The Group General Manager (P), ONGC
Ltd., Ahmedabad Project, Avani Bhawan, Chandkheda, Ahmedabad, hereinafter referred to as “ONGC”. The second
party union sent a notice dated 12.12.1998 to the first party regarding making the workmen as permanent employees
along with other benefits like basic salary, dearness allowance and annual increment etc. The second party union
submitted a representation before the Conciliation Officer where ONGC filed the reply but ONGC did not accept the
demands of the union, consequently reconciliation ended in failure. It has been further alleged by the second party that
the workmen detailed in the annexure were employed by ONGC. The workmen were performing the duties with the
establishment of ONGC permanently and regularly as being of permanent nature. The work performed by the workmen
was of a permanent nature therefore, the workmen were entitled for regularisation/permanent. The workmen were never
stopped to work or terminated. The workmen were allotted the work by the officers of ONGC under their direct
supervision and control. Attendance register of the workmen were also maintained by ONGC. Wages were also paid by
ONGC. Their working hours and shifts of work were also regulated by ONGC. The workmen were carried over to the
workplace by the ONGC transport. Tools were provided by the ONGC to the workmen. No middle agency was involved
between the workmen and ONGC regarding their duties. The contract reached between the ONGC and the contractor, if
any, was not existing, therefore, sham and bogus. There was no difference between the work performed by the workmen
concerning the reference and the regular employees of ONGC but there was a vast difference between the salaries
between the workmen and regular employees of ONGC. The workmen were not provided any presence card, identity
card etc. which were always provided to employees. These workmen have been working under the notification dated
08.09.1994. The contract between the ONGC and the contractor was against the CLRA Act. The defence taken by the
ONGC during conciliation was untenable. Thus the union has prayed for regularisation of the workmen as a regular
employee of ONGC from the initial date of joining with a legal cost of reference.
¹Hkkx IIµ[k.M 3(ii)º
Hkkjr dk jkti=k % vxLr 11] [email protected] 20] 1940
5093
2.
The second party union also moved an interim relief application Ex. 2 along with the statement of claim on the
same ground but no order was passed on the said application.
3.
The first party ONGC submitted the written statement Ex. 18 denying the averments made in the statement of
claim but admitted that the workmen were working under a contract and submitted that the reference is incompetent and
void in law and also not maintainable. The reference suffers with delay and latches and the terms of the reference are
vague. ONGC used to award various jobs of casual and seasonal nature on contract basis to the contractors so as to get
the job done awarded to the contractors within the time frame provided in the contract through engagement of labourers.
The ONGC had a recruitment rules, promotion and regularisation policy to be strictly followed by it in the light of the
instructions and circulars of the Union of India regarding rosters, reservations policy etc. These second party workmen
were never appointed by ONGC as per the procedure provided under the ONGC recruitment rules, therefore, they are not
entitled to get any relief and the reference is liable to be dismissed.
4.
On the basis of the averments made in the statement of claim and written statements, the following issues arise:
I.
Whether the demand of General Mazdoor Sabha that the so called contract under which the employees Shri
Zala Govindbhai Mangalsinh and 21 others in the various department of ONGC Ahmedabad Project
‘sham’ and ‘bogus’ arrangement and the concerned employees be treated in direct employment in ONGC
Ahmedabad Project from their date of engagement with all consequential benefits through the so called
contractors is legal and justified?
II.
To what relief, if any, the concerned workmen are entitled?
5.
Issue No. I & II: Both the issues are interrelated, therefore, are decided together. The burden of proof of these
issues was lying on the second party union but the second party union despite giving dozens of opportunities, did not
prefer to lead evidence and also submitted the closing purses vide Ex. 61 on 12.02.2018. Thus it is a case of no evidence.
6.
The ONGC in his written statement has alleged that the workmen were the contractual employees; therefore, there
was no master servant relationship between the ONGC and the workmen. The second party has vaguely alleged that they
were not contractual employees but somehow admitted that they were engaged by the contractor but the contractor has
not been made the party, therefore, the reference suffers with the non-joinder of contractor in the reference. The second
party union has alleged that the workmen have been working under the prohibit category but no such notification as well
as the details of the work done by the workmen as alleged to be in the prohibit category, has not been submitted.
Secondly, the alleged notification dated 08.09.1994 was stayed by the Hon’ble Andhra Predesh High Court which has
been submitted by the first party.
7.
Thus the reference in the light of the judgement of the Hon’ble Allahabad High Court in re NTPC, 2015 (144)
FLR 248 and Hon’ble Supreme Court in Yogesh Mahajan v/s Professor R. C. Deka, Director, All India Institute of
Medical Science, 2018 (157) FLR 287 SC, has no force and is liable to be dismissed.
8.
Thus the reference is disposed of with the observation as under: “the demand of General Mazdoor Sabha that the
so called contract under which the employees Shri Zala Govindbhai Mangalsinh and 21 others in the various department
of ONGC Ahmedabad Project ‘sham’ and ‘bogus’ arrangement and the concerned employees be treated in direct
employment in ONGC Ahmedabad Project from their date of engagement with all consequential benefits through the so
called contractors is illegal and unjustified.”
9.
The award is passed accordingly.
P. K. CHATURVEDI, Presiding Officer
ubZ fnYyh] 6 vxLr] 2018
dk-vk- 1195-—vkS|ksfxd fookn vf/fu;e] 1947 (1947 dk 14) dh èkkjk 17 ds vuqlj.k esa dsUnzh; ljdkj eSllZ vks-,u-
th-lh- fyfeVsM ds çcaèkra=k ds lac¼ fu;kstdksa vkSj muds deZdkjksa ds chp] vuqcaèk esa fu£n"V vkS|ksfxd fookn esa dsUnzh; ljdkj
vkS|ksfxd vfèkdj.k ,oa Je U;k;ky;] vgenkckn ds iapkV (lanHkZ la[;k 256@2004) dks çdkf'kr djrh gS] tks dsUnzh; ljdkj dks
01-08-2018 dks çkIr gqvk FkkA
¹la- ,y&30011@51@1999&vkbZvkj (,e)º
Mh- ds- fgeka'kq] voj lfpo
New Delhi, the 6th August, 2018
S.O. 1195.—In pursuance of Section 17 of the Industrial Disputes Act, 1947 (14 of 1947), the Central
Government hereby publishes the Award (Ref. No. 256/2004) of the Central Government Industrial Tribunal/Labour
5094
THE GAZETTE OF INDIA : AUGUST 11, 2018/SRAVANA 20, 1940
[PART II—SEC. 3(ii)]
Court, Ahmedabad now as shown in the Annexure, in the industrial dispute between the employers in relation to the
management of M/s. O.N.G.C. Ltd. and their workmen, which was received by the Central Government on 01.08.2018.
[No. L-30011/51/1999-IR (M)]
D. K. HIMANSHU, Under Secy.
ANNEXURE
BEFORE THE CENTRAL GOVERNMENT INDUSTRIAL TRIBUNAL-CUM-LABOUR COURT,
AHMEDABAD
Present :
Pramod Kumar Chaturvedi,
Presiding Officer, CGIT-cum-Labour Court,
Ahmedabad,
Dated 3rd July, 2018
Reference: (CGITA) No. 256/2004
The Group General Manager (P),
ONGC Ltd.,
Ahmedabad Project,
Avani Bhawan, Chandkheda,
Ahmedabad (Gujarat) – 380005
…First Party
V/s
The General Secretary,
General Mazdoor Sabha,
Divetia Blocks, Raikhad,
Ahmedabad (Gujarat)
…Second Party
For the First Party No
:
Shri K.V. Gadhia
For the Second Party
:
Shri Raghuvir Mali
AWARD
The Government of India/Ministry of Labour, New Delhi by reference adjudication Order No. L-30011/51/99–
IR(M) dated 15.12.1999 referred the dispute for adjudication to the Industrial Tribunal, Ahmedabad (Gujarat) in respect
of the matter specified in the Schedule:
SCHEDULE
“Whether the demand of General Mazdoor Sabha that the contract under which the employees Shri Rabari
Jayrambhai Cheharbhai and 31 others were engaged in the various department of ONGC be treated as ‘sham
and bogus’ and the concerned employees be treated in direct employment in ONGC Ahmedabad Project from
their date of engagement with consequential benefits through the so called contractors is justified? If so, to
what relief the concerned workmen are entitled?”
1.
The reference dates back to 15.12.1999. The second party submitted the statement of claim Ex. 4 on 15.03.2000
alleging that the second party union The General Secretary, General Mazdoor Sabha, Divetia Blocks, Raikhad,
Ahmedabad, hereinafter referred to as “union”, has right to raise the dispute concerning the workmen who are members
of the union. The union is active in trade union activities with the first party The Group General Manager (P), ONGC
Ltd., Ahmedabad Project, Avani Bhawan, Chandkheda, Ahmedabad, hereinafter referred to as “ONGC”. The second
party union sent a notice dated 02.02.1999 to the first party regarding making the workmen as permanent employees
along with other benefits like basic salary, dearness allowance and annual increment etc. The second party union
submitted a representation before the Conciliation Officer where ONGC filed the reply but ONGC did not accept the
demands of the union, consequently reconciliation ended in failure. It has been further alleged by the second party that
the workmen detailed in the annexure were employed by ONGC. The workmen were performing the duties with the
establishment of ONGC permanently and regularly as being of permanent nature. The work performed by the workmen
was of a permanent nature therefore, the workmen were entitled for regularisation/permanent. The workmen were never
stopped to work or terminated. The workmen were allotted the work by the officers of ONGC under their direct
supervision and control. Attendance register of the workmen were also maintained by ONGC. Wages were also paid by
ONGC. Their working hours and shifts of work were also regulated by ONGC. The workmen were carried over to the
workplace by the ONGC transport. Tools were provided by the ONGC to the workmen. No middle agency was involved
between the workmen and ONGC regarding their duties. The contract reached between the ONGC and the contractor, if
any, was not existing, therefore, sham and bogus. There was no difference between the work performed by the workmen
¹Hkkx IIµ[k.M 3(ii)º
Hkkjr dk jkti=k % vxLr 11] [email protected] 20] 1940
5095
concerning the reference and the regular employees of ONGC but there was a vast difference between the salaries
between the workmen and regular employees of ONGC. The workmen were not provided any presence card, identity
card etc. which were always provided to employees. These workmen have been working under the notification dated
08.09.1994. The contract between the ONGC and the contractor was against the CLRA Act. The defence taken by the
ONGC during conciliation was untenable. Thus the union has prayed for regularisation of the workmen as a regular
employee of ONGC from the initial date of joining with a legal cost of reference.
2.
The second party union also moved an interim relief application Ex. 2 along with the statement of claim on the
same ground but no order was passed on the said application.
3.
The first party ONGC submitted the written statement Ex. 18 denying the averments made in the statement of
claim but admitting that the workmen were working under a contractand submitting that the reference is incompetent and
void in law and also not maintainable. The reference suffers with delay and latches and the terms of the reference are
vague. ONGC used to award various jobs of casual and seasonal nature on contract basis to the contractors so as to get
the job done awarded to the contractors within the time frame provided in the contract through engagement of labourers.
The ONGC had a recruitment rules, promotion and regularisation policy to be strictly followed by it in the light of the
instructions and circulars of the Union of India regarding rosters, reservations policy etc. These second party workmen
were never appointed by ONGC as per the procedure provided under the ONGC recruitment rules, therefore, they are not
entitled to get any relief and the reference is liable to be dismissed.
4.
On the basis of the averments made in the statement of claim and written statements, the following issues arise:
I.
Whether the demand of General Mazdoor Sabha that the contract under which the employees Shri Rabari
Jayrambhai Cheharbhai and 31 others were engaged in the various department of ONGC be treated as ‘sham
and bogus’ and the concerned employees be treated in direct employment in ONGC Ahmedabad Project
from their date of engagement with consequential benefits through the so called contractors is justified?
II.
To what relief, if any, the concerned workmen are entitled?
5.
Issue No. I & II: Both the issues are interrelated, therefore, are decided together.The burden of proof of these
issues was lying on the second party union but the second party union despite giving dozens of opportunities, did not
prefer to lead evidence and also submitted the closing purses vide Ex. 62 on 12.02.2018. Thus it is a case of no evidence.
6.
The ONGC in his written statement has alleged that the workmen were the contractual employees; therefore, there
was no master servant relationship between the ONGC and the workmen. The second party has vaguely alleged that they
were not contractual employees but somehow admitted that they were engaged by the contractor but the contractor has
not been made the party, therefore, the reference suffers with the non-joinder of contractor in the reference. The second
party union has alleged that the workmen have been working under the prohibit category but no such notification as well
as the details of the work done by the workmen as alleged to be in the prohibit category, has not been submitted.
Secondly, the alleged notification dated 08.09.1994 was stayed by the Hon’ble Andhra Predesh High Court which has
been submitted by the first party.
7.
Thus the reference in the light of the judgement of the Hon’ble Allahabad High Court in re NTPC, 2015 (144)
FLR 248 and Hon’ble Supreme Court in Yogesh Mahajan v/s Professor R. C. Deka, Director, All India Institute of
Medical Science, 2018 (157) FLR 287 SC, has no force and is liable to be dismissed.
8.
Thus the reference is disposed of with the observation as under: “the demand of General Mazdoor Sabha that the
contract under which the employees Shri Rabari Jayrambhai Cheharbhai and 31 others were engaged in the various
department of ONGC be treated as ‘sham and bogus’ and the concerned employees be treated in direct employment in
ONGC Ahmedabad Project from their date of engagement with consequential benefits through the so called contractors
is not justified.”
9.
The award is passed accordingly.
P. K. CHATURVEDI, Presiding Officer
ubZ fnYyh] 6 vxLr] 2018
dk-vk- 1196-—vkS|ksfxd fookn vf/fu;e] 1947 (1947 dk 14) dh èkkjk 17 ds vuqlj.k esa dsUnzh; ljdkj eSllZ vks-,u-
th-lh- fyfeVsM ds çcaèkra=k ds lac¼ fu;kstdksa vkSj muds deZdkjksa ds chp] vuqcaèk esa fu£n"V vkS|ksfxd fookn esa dsUnzh; ljdkj
vkS|ksfxd vfèkdj.k ,oa Je U;k;ky;] vgenkckn ds iapkV (lanHkZ la[;k 371@2004) dks çdkf'kr djrh gS] tks dsUnzh; ljdkj dks
01-08-2018 dks çkIr gqvk FkkA
¹la- ,y&30015@3@2001&vkbZvkj (,e)º
Mh- ds- fgeka'kq] voj lfpo
5096
THE GAZETTE OF INDIA : AUGUST 11, 2018/SRAVANA 20, 1940
[PART II—SEC. 3(ii)]
New Delhi, the 6th August, 2018
S.O. 1196.—In pursuance of Section 17 of the Industrial Disputes Act, 1947 (14 of 1947), the Central
Government hereby publishes the Award (Ref. No. 371/2004) of the Central Government Industrial Tribunal/Labour
Court, Ahmedabad now as shown in the Annexure, in the industrial dispute between the employers in relation to the
management of M/s. O.N.G.C. Ltd. and their workmen, which was received by the Central Government on 01.08.2018.
[No. L-30015/3/2001-IR (M)]
D. K. HIMANSHU, Under Secy.
ANNEXURE
BEFORE THE CENTRAL GOVERNMENT INDUSTRIAL TRIBUNAL-CUM-LABOUR COURT,
AHMEDABAD
Present :
Pramod Kumar Chaturvedi,
Presiding Officer, CGIT-cum-Labour Court,
Ahmedabad,
Dated 19th July, 2018
Reference: (CGITA) No. 371/2004
The Project Manager,
ONGC Ltd.,
Cambay Project, Kansari, Tal. Cambay,
Anand (Gujarat)
…First Party
V/s
The General Secretary,
Gujarat Mazdoor Panchayat,
Shram Shakti, P.B. No. 77, GPO,
Opp. Prabhat Press, Mirzapur,
Ahmedabad (Gujarat)
…Second Party
For the First Party No
:
Shri K.V. Gadhia
For the Second Party
:
Shri Sanjay Vaghela
AWARD
The Government of India/Ministry of Labour, New Delhi by reference adjudication Order No. L-30015/3/2001–
IR(M) dated 01.02.2001 referred the dispute for adjudication to the Industrial Tribunal, Ahmedabad (Gujarat) in respect
of the matter specified in the Schedule:
SCHEDULE
“Whether the demand of Gujarat Mazdoor Panchayat, Ahmedabad that the contract arrangement under which
the workmen Shri Baldevbhai Bhimsinh Parmar and 93 others employed in ONGC Cambay Project is sham
and bogus and the category in which they are working is prohibited category of employment vide Notification
NO. 779 (c) dated 08.12.1976 and the concerned workmen are entitled to be treated in direct employment in
ONGC Ltd., Cambay from the date of their joining along with all benefits at par with permanent employees of
ONGC Ltd., is legal and justified? If yes then to what relief the concerned workman are entitled to and from
which date?”
1.
The reference dates back to 01.02.2001 and was received on 20.02.2001 from Ministry of Labour and
Employment, New Delhi for adjudication. Both the parties issued notices by the registered post. In response to the
notices, the second party union The General Secretary, Gujarat Mazdoor Panchayat, Shram Shakti, P.B. No. 77, GPO,
Opp. Prabhat Press, Mirzapur, Ahmedabad, hereinafter referred to as “Panchayat” submitted the statement of claim Ex. 5
wherein he has alleged that the Panchayat has raised this dispute on behalf of the 94 workmen detailed in the list annexed
with the schedule of the reference. These workmen were doing the work of watching the different installations of ONGC
since last several years. The appropriate authority under the Contract Labour (Regulation and Abolition) Act, hereinafter
referred to as “Act” is the Central Government as the first party ONGC Ltd., hereinafter referred to as “ONGC” and is
the Public Sector Undertaking (P.S.U.) of Government of India. The Ministry of Labour & Employment, Government of
India vide notification dated 08.12.1976 prohibited the engagement of contract labour w.e.f. 01.03.1977 related to
watching in all the establishments/organisations under the control or undertaking of the Government of India but the
ONGC continued to employ the workmen related to this reference as contract labour. The judgement of Hon’ble
¹Hkkx IIµ[k.M 3(ii)º
Hkkjr dk jkti=k % vxLr 11] [email protected] 20] 1940
5097
Supreme Court in Air India Corporation V/s National Labour Union, 1997 (1) CLR Page 292 laid down the law wherein
the Hon’ble Supreme Court in clear terms has held that once the contract labour engagement is prohibited by the
Government by way of a notification under the Act, the workmen employed as contract labour in the prohibited category
will automatically stand absorbed as permanent workmen of the principle employer from the date the aforesaid
notification took effect. In this case, the notification under the aforesaid Act has taken took effect on 01.03.1977,
therefore, all the workmen in this reference will stand absorbed as permanent watchman of ONGC w.e.f. 01.03.1977. The
second party Panchayat further alleged that the workmen concerned were employed as contract labour after the said
notification dated 08.12.1976 came into effect on 01.03.1977, therefore, ONGC ought not to have contract labour for
doing the watchman work in its installations after 01.03.1977. The very engagement of contract labour to do the job of
watching the installations of ONGC on or after 01.03.1977 was illegal. These workmen had been doing the work of
watching in different installations of ONGC and different missionaries even after 01.03.1977. It is further alleged that
after conciliation proceedings, the matter came to this tribunal. The ONGC did not say anything in the conciliation
proceedings to explain the reasons of engaging contract labour. ONGC has also not produced the registration certificate
obtained by it under the Act to engage the workmen in ONGC. The licence issued to the contractor was also not filed.
The certificate of registration with the principle employer ONGC and the licence to employ contractor labour were two
statutory requirements for engaging the contract labour. It is further alleged that failing to fulfil the statutory
requirements, the contract between the ONGC and the contractor can be said to be sham and bogus and therefore, the
workmen engaged as contract labour ought to be treated as permanent employees of ONGC. Thus on the ground of the
following averments, the Panchayat has prayed for passing the award directing the ONGC to declare the workmen
concerned in this reference as permanent workmen of ONGC with a direction to ONGC to treat them as permanent
workman and to pay them admissible wages.
2.
The Panchayat also moved an application Ex. 6 on 27.04.2001 for interim relief directing the ONGC not to
change the service conditions of 94 workmen concerned in the reference by way of termination or otherwise without the
permission of the tribunal as being in consonance to Section 33 (1) of the Industrial Disputes Act, 1947, reiterating the
averments made in the statement of claim Ex. 5. The tribunal on 27.04.2001 passed an order directing the ONGC to
maintain status quo into the matter.
3.
The first party ONGC submitted the written statement Ex. 10 wherein the ONGC took preliminary objections that
the concerned 94 persons in the reference were not been the workmen as defined under Section 2 (S) of the Industrial
Disputes Act and there were no industrial dispute exists defined under Section 2 (K) of the Industrial Disputes Act as
these persons were contractual employees. Further objections were also raised that the Panchayat was having a remedy
under the Contract Labour (Regulation and Abolition) Act; therefore, this dispute cannot be entertained under the
Industrial Disputes Act. It is also submitted that the reference is incompetent and bad in law and the tribunal has no
jurisdiction to entertain the dispute, therefore, the reference is liable to be rejected. It is further submitted that there was
no master servant relationship between the ONGC and the workmen and as the contractors were not impleaded as party,
therefore, the reference is bad for non-joinder of the necessary parties. It is further submitted that the averments made in
the statement of claim Ex. 5 are incorrect and are not true. It is also denied that these workmen were doing the watchman
work since years as alleged. It is also denied that the workers engaged by the contractor were covered by the notification
dated 08.12.1976 under the Act issued by Government of India. The judgement referred in the statement of claim, that is
Air India Corporation V/s National Labour Union, 1997 (1) CLR Page 292, is not applicable in the case. It is further
alleged that these workmen were not appointed as per the recruitment rules of ONGC; therefore, the reference is liable to
be decided in negative against the Panchayat/workmen.
4.
During the course of proceedings, number of persons moved applications to be impleaded as second party
workman in the reference as they were also doing the work of similar nature.
5.
On the basis of the pleadings of both the parties, the following issues are to be decided:
I.
Whether the demand of Gujarat Mazdoor Panchayat, Ahmedabad that the contract arrangement under
which the workmen Shri Baldevbhai Bhimsinh Parmar and 93 others employed in ONGC Cambay Project
is sham and bogus and the category in which they are working is prohibited category of employment vide
Notification NO. 779 (c) dated 08.12.1976 and the concerned workmen are entitled to be treated in direct
employment in ONGC Ltd., Cambay from the date of their joining along with all benefits at par with
permanent employees of ONGC Ltd., is legal an justified?
II.
To what relief, if any, the workman is entitled?
6.
Issue No. I & II: Both the issues are interrelated, therefore, decided together. The burden of prove of these issues
was lying on the second party union. The second party Panchayat examined one Bhailalbhai D. Parmar vide affidavit Ex.
13 wherein he has stated that he has been working as a Security Guard since April, 1989 and his job was supervised by
ONGC officers who used to assign work to him. He was also doing the work of protecting the property of ONGC. He has
further stated that 93 others workers listed with the reference are known to him and they were also doing the job similar
to him. All of them used to work in 3 shifts and also they have to keep ONGC officers inform on every day while
5098
THE GAZETTE OF INDIA : AUGUST 11, 2018/SRAVANA 20, 1940
[PART II—SEC. 3(ii)]
resuming and leaving the work place. In his cross-examination, he has stated that his posting was near the residential
colony of employees but all of them have not issued appointment letters by ONGC. He does not know the date of joining
of all the concerned workmen and proof thereof. All of them used to receive Rs. 141/- per day as wages. He does not
know the age and educational qualifications of all the concerned workmen. He has admitted that their engagement was
always done by the contractor. Provident Fund (P.F.) was also deducted by the contractor.
7.
Another witness named Kabhaibhai B. Solanki was also examined vide affidavit Ex. 27 reiterating the same
deposition in his examination-in- chief as well as cross-examination as stated by the earlier witness.
8.
The first party ONGC submitted documents vide list Ex. 12 like copy of agreement with M/s New Industrial
Security Services with the ONGC, certificate of registration under CLRA Act. PF registration letter of the aforesaid
contractor, copy of annual return submitted to ALC, Central and copy of licence under CLRA Act by M/s New Industrial
Security Services.
9.
The ONGC has also submitted the aforesaid documents as mentioned in Para 8 vide Ex. 29 with respect to 60
workmen of another contractor M/s Abhay Intelligence and Security Services and M/s Eagal Security and Personnel
Services.
10.
The ONGC has also submitted the similar documents vide Ex. 32 with respect to 52 workmen of contractor M/s
New Industrial Security Services.
11.
The ONGC further submitted 2 documents vide Ex. 30(a) regarding the copy of instructions for guard at lodging
point and copy of licence of contractor namely Prime Security and Intelligence Service from the period 31.08.2016 to
30.08.2017.
12.
The ONGC vide affidavit Ex. 30 examined one R.S. Bhati, Security Officer, wherein he has stated that these
workmen have been working with their respective contractors under their supervision and control. Wages were also paid
by the contractors. Contractors used to deduct the Provident Fund and remit the same to the Provident Fund Department.
The ONGC was not having any supervision and control over these workmen. They have been working with the
prohibited category. ONGC never appointed them as their workmen. ONGC has its own recruitment rules and these
persons have not undergone the said process of recruitment. Contract is always provided to the contractors after
undergoing a tender process and various documents like copy of agreements, licences and registration which are based on
record. He has further stated that on 26.03.2014; only 59 persons were working out of the total 94 persons listed. In his
cross-examination done by the Panchayat, he stated that the entire project including well, colony and pipelines are known
as Cambay Assets and these Security Guards are used to maintain entry and exit in the project in 3 shifts. He denied that
these workmen were doing work since 1977. They were working since 1989. The second party Panchayat did not put any
question regarding the workmen doing work under the contractor, therefore, it is admitted that these workmen were
doing the work under the contractor.
13.
The second party Panchayat vide written argument Ex. 34 submitted that these workers have been doing work as
watchman since 1999 concerning ONGC buildings and Oil Tankers in ONGC premises under supervisions of ONGC
officers and payment has also made by them. They were regular employees of ONGC since 1989 as per the documentary
evidence and notification dated 08.12.1976.
14.
The second party Panchayat referred Hussainbhai V/s Alath Factory Thozhilali Union, Calicut, 1978 LLJ Page 1
SC, wherein the Hon’ble Supreme Court has held that in a laisses faire economy based on common law and the
contractor, the position may be different but the Industrial branch of 3rd World Jurisprudence based on social justice, near
contract are not decided and a complex of considerations are relevant in deciding the real dispute. The true test may be
indicated once again, where a worker or group of workers labours to produce goods and services and these goods or
services are for the business of another, that other is in fact, the employer. He has economic control over the workers’
subsistence, skill and continued employment. If he, for any reason, chokes off, the worker is virtually laid-off. The
presence of intermediate contractors with whom alone the workers have immediate or direct relationship ex-contractu is
of no consequence when, on lifting the veil or looking at the conspectus of factors governing employment, we discover
the naked truth, through draped in different paper arrangement, that the real employer is the management, not the
immediate contractor. Myriad devices, half hidden in fold after fold of legal form depending on the degree of
concealment needed, the type of industry, the local conditions and the like may be resorted to when labour legislation
casts welfare obligations on the real employer, based on Arts 38, 39, 42, 43 and 43A of the Constitution. The Court must
be astute to avoid the mischief and achieve the purpose of the law and not be misled by the maya of legal appearance.
15.
The second party further relied on Steel Authority of India Limited V/s Gujarat Mazdoor Panchayat, 2004 (2)
CLR 275 Guj., wherein the Hon’ble High Court did not interfere into the similar matter. He further relied on General
Manager, HPCL V/s General Secretary, General Employees Association, 2010 (2) CLR 945 and ONGC V/s Petroleum
Employees Union, 2011 (3) CLR 590 wherein it has been held that once the appropriate Government issued notification
under Section 10 (1) of the CLRA Act, 1970, prohibiting employment of contract labour to carry out certain operations in
the factory or establishment in particular industry or PSU, engaging labourers through contractor to carry out such
operations, said contract shall be sham and bogus.
¹Hkkx IIµ[k.M 3(ii)º
Hkkjr dk jkti=k % vxLr 11] [email protected] 20] 1940
5099
16.
The second party has further relied on ONGC V/s CGIT, Lucknow, 2011 (3) CLR 448 wherein the High Court of
Uttrakhand held that the High Court in its writ jurisdiction cannot sit like a code of appeal and cannot appreciate or re-
evaluate the evidence arriving to a different conclusion.
17.
The ONGC made oral submissions that the witness of the first party has stated that in the year 2014, 54 persons
out of 94 persons were working and as on 13.01.2017, only 52 persons out of 94 persons were working which were not
controverted by the union, therefore, this reference is limited to 52 workmen. As regard the applications Ex. 15 to 25 for
impleading of 5 more workmen, same was not pressed.
18.
The ONGC has further argued that as per the terms of reference, the concerned workmen were alleged to have
been working in prohibited category as per notification dated 08.12.1976 which is not applicable in this case because in
the case of Steel Authority of India Limited reported in 2001 (3) CLR 349 SC, the apex court has quashed the aforesaid
notification, therefore, the basis of prohibited category for these workmen does not survive. It is also noteworthy that the
second party Panchayat accepted the above notification dated 08.12.1976 and raised this matter before High Court in
Special Civil Application (SCA) No. 10776/1995.
19.
It has further argued by the first party ONGC that the Panchayat has not produced the documentary evidence
regarding their due recruitment with the ONGC, appointment date, nature of work; continuous working, age-qualification
and fulfilment of eligibility criteria while the ONGC has submitted the documentary evidence vide Ex. 28, 29, 32 & 33
as discussed above. It is further argued that in Yogesh Mahajan V/s Pro. R.C. Deka, Director, AIIMS, 2018 (157) FLR
287 SC, the Hon’ble Supreme Court has held that the persons appointed on contractual or fixed terms cannot claim
regularisation. He has further argued that Hon’ble Supreme Court in case of International Airport Cargo Workers Union,
2010 (3) CLR 140 held that if the workers are doing the duty in premises of principle employer and even if there is some
degree of supervision and control, they shall not be entitled for regularisation.
20.
From the evidences and submissions of the parties, it is fully established that the workmen were engaged by the
contractor who has not been impleaded as a party. Second the notification dated 08.12.1976 has not been produced and
has also been stayed in the judicial side. Third, as appears from the evidence, only 52 workmen out of 94 workmen were
found to be working on the date of reference received in the tribunal. None of the judgements relied by the second party
has applicability in the matter. All the workmen were contract employees working under the various contractors as
established by the evidence of both the parties and they have not been recruited by the ONGC as per its recruitment
process under the rules, therefore, the contract cannot be said to be sham and bogus.
21.
It has been admitted by both the parties that all the 52 workmen have been working for a long period in ONGC
under the control of contractor, therefore, it would be appropriate to order the ONGC to pay them Rs. 100000/- (Rupees
One Lac) to each aforesaid 52 workmen shown in the list of workmen vide Ex. 32/3 working as on 13.01.2017 submitted
by ONGC.
22.
The award is passed accordingly. The first party is directed to pay the aforesaid amount of Rs. 100000/- (Rupees
One Lac) to each 52 workmen within 60 days from the date of publication of this award.
P. K. CHATURVEDI, Presiding Officer
ubZ fnYyh] 6 vxLr] 2018
dk-vk- 1197-—vkS|ksfxd fookn vf/fu;e] 1947 (1947 dk 14) dh èkkjk 17 ds vuqlj.k esa dsUnzh; ljdkj eSllZ
,;jiksVZ vFkkWfjVh vkWiQ bf.M;k ds çcaèkra=k ds lac¼ fu;kstdksa vkSj muds deZdkjksa ds chp] vuqcaèk esa fu£n"V vkS|ksfxd fookn esa
dsUnzh; ljdkj vkS|ksfxd vfèkdj.k ,oa Je U;k;ky;] vgenkckn ds iapkV (lanHkZ la[;k 457@2004) dks çdkf'kr djrh gS] tks dsUnzh;
ljdkj dks 01-08-2018 dks çkIr gqvk FkkA
¹la- ,y&11011@11@2001&vkbZvkj (,e)º
Mh- ds- fgeka'kq] voj lfpo
New Delhi, the 6th August, 2018
S.O. 1197.—In pursuance of Section 17 of the Industrial Disputes Act, 1947 (14 of 1947), the Central
Government hereby publishes the Award (Ref. No. 457/2004) of the Central Government Industrial Tribunal/Labour
Court, Ahmedabad now as shown in the Annexure, in the industrial dispute between the employers in relation to the
management of M/s. Airport Authority of India and their workman, which was received by the Central Government on
01.08.2018.
[No. L-11011/11/2001-IR (M)]
D. K. HIMANSHU, Under Secy.
5100
THE GAZETTE OF INDIA : AUGUST 11, 2018/SRAVANA 20, 1940
[PART II—SEC. 3(ii)]
ANNEXURE
BEFORE THE CENTRAL GOVERNMENT INDUSTRIAL TRIBUNAL-CUM-LABOUR COURT,
AHMEDABAD
Present :
Pramod Kumar Chaturvedi,
Presiding Officer, CGIT-cum-Labour Court,
Ahmedabad,
Dated 11th July, 2018
Reference: (CGITA) No. 457/2004
The Airport Director,
Airport Authority of India,
Sardar Vallabh Bhai Patel International Airport,
Ahmedabad (Gujarat) – 380003
…First Party
V/s
The Secretary,
Gujarat Mazdoor Panchayat Shram Shakti,
Post Box No. 77, G.P.O. Opposite Prabhat Press,
Mirzapur Road,
Ahmedabad (Gujarat)
…Second Party
For the First Party No
:
Shri C.N. Naidu
For the Second Party
:
Shri Sanjay Vaghela
AWARD
The Government of India/Ministry of Labour, New Delhi by reference adjudication Order No. L-11011/11/2001–
IR(M) dated 07.01.2002 referred the dispute for adjudication to the Industrial Tribunal, Ahmedabad (Gujarat) in respect
of the matter specified in the Schedule:
SCHEDULE
“Whether Gujarat Mazdoor Panchayat Ahmedabad in demanding to declare the contract agreement by which
Shri Mahes Bhai Pujabhai Vaghela and Shri Nareshkumar Kantilal Parmar are employed as sham and bogus
and to declare these workmen as permanent workmen of Airport Authority of India with effect from the date
of initial employment along with consequential benefits? If so what relief these concerned workmen are
entitled?”
1.
The reference was received on 07.01.2002 from Ministry of Labour and Employment, New Delhi for
adjudication. The second party workmen submitted the statement of claim Ex. 2 on 17.02.2002 and the first party
submitted the written statement Ex. 17 on 20.04.2005 along with number of documents. Since then the second party has
not been leading evidence. On 10.08.2016, Shri Sanjay Vaghela, Advocate for Gujarat Mazdoor Panchayat Shram Shakti
moved an application Ex. 20 on 10.08.2016 seeking opportunity to lead evidence. Since then Shri Sanjay Vaghela failed
to lead evidence. On 04.04.2018, Shri Sanjay Vaghela sought last opportunity to lead evidence that too no result. Today
on 11.07.2018, the second party workmen as well as his advocate Shri Sanjay Vaghela are absent.
2.
Thus it appears that the second party is not willing to prosecute with the reference.
3.
Thus the reference in the absence of the evidence of the second party, is disposed of with the observation as
under: “the demand of Gujarat Mazdoor Panchayat Ahmedabad to declare the contract agreement by which Shri Mahes
Bhai Pujabhai Vaghela and Shri Nareshkumar Kantilal Parmar are employed, is sham and bogus and the demand to
declare these workmen as permanent workmen of Airport Authority of India with effect from the date of initial
employment along with consequential benefits can be said to be illegal and unjustified.”
P. K. CHATURVEDI, Presiding Officer
ubZ fnYyh] 6 vxLr] 2018
dk-vk- 1198-—vkS|ksfxd fookn vf/fu;e] 1947 (1947 dk 14) dh èkkjk 17 ds vuqlj.k esa dsUnzh; ljdkj eSllZ
dk.Myk iksVZ VªLV ds çcaèkra=k ds lac¼ fu;kstdksa vkSj muds deZdkjksa ds chp] vuqcaèk esa fu£n"V vkS|ksfxd fookn esa dsUnzh; ljdkj
¹Hkkx IIµ[k.M 3(ii)º
Hkkjr dk jkti=k % vxLr 11] [email protected] 20] 1940
5101
vkS|ksfxd vfèkdj.k ,oa Je U;k;ky;] vgenkckn ds iapkV (lanHkZ la[;k 1015@2004) dks çdkf'kr djrh gS] tks dsUnzh; ljdkj dks
01-08-2018 dks çkIr gqvk FkkA
¹la- ,y&37011@2@1996&vkbZvkj (,e)º
Mh- ds- fgeka'kq] voj lfpo
New Delhi, the 6th August, 2018
S.O. 1198.—In pursuance of Section 17 of the Industrial Disputes Act, 1947 (14 of 1947), the Central
Government hereby publishes the Award (Ref. No. 1015/2004) of the Central Government Industrial Tribunal/Labour
Court, Ahmedabad now as shown in the Annexure, in the industrial dispute between the employers in relation to the
management of M/s. Kandla Port Trust and their workman, which was received by the Central Government on
01.08.2018.
[No. L-37011/2/1996-IR (M)]
D. K. HIMANSHU, Under Secy.
ANNEXURE
BEFORE THE CENTRAL GOVERNMENT INDUSTRIAL TRIBUNAL-CUM-LABOUR COURT,
AHMEDABAD
Present :
Pramod Kumar Chaturvedi,
Presiding Officer, CGIT-cum-Labour Court,
Ahmedabad,
Dated 16th July, 2018
Reference: (CGITA) No. 1015/2004
The Secretary,
Kandla Port Trust,
Administrative Office, Gandhidham,
Kutct (Gujarat) – 370201
…First Party
V/s
The General Secretary,
Transport & Dock Workers’ Union,
Room No. 26, Yogesh Building, Plot No. 589,
Ward No. 12-C, Gandhidham,
Kutch (Gujarat) – 370201
…Second Party
For the First Party No
:
Shri K.V. Gadhia
For the Second Party
:
Shri N.H. Rathod
AWARD
The Government of India/Ministry of Labour, New Delhi by reference adjudication Order No. L-37011/2/96–
IR(M) dated 31.05.1996 referred the dispute for adjudication to the Industrial Tribunal, Ahmedabad (Gujarat) in respect
of the matter specified in the Schedule:
SCHEDULE
“Whether the demand of the Transport and Dock Workers’ Union, Gandhidham that Shri R.S. Mehta,
Sub-Storekeeper, should be promoted to the post of Assistant Store Keeper on regular basis and not Shri Dilipsingh
B. Jethwa, Junior Clerk made senior to Shri Jethwa in the category of Assistnat Store Keeper just, valid and legal? If
so to what benefits Shri R.S. Mehta is entitled for and what directions are necessary in the matter?”
1.
The reference dates back to 31.05.1996 and received on 10.06.1996 from Ministry of Labour and Employment,
New Delhi for adjudication. Both the parties, submitted the statement of claim and written statements, also led evidence
but at the time of argument, the advocate for the second party Shri Nirdosh H. Rathod submitted a letter Ex. 21 on behalf
of the second party union The General Secretary, Transport & Dock Workers’ Union, Room No. 26, Yogesh Building,
Plot No. 589, Ward No. 12-C, Gandhidham, Kutch, submitting that the union does not want to press the reference.
2.
Hence the reference is disposed of as not pressed.
P. K. CHATURVEDI, Presiding Officer
5102
THE GAZETTE OF INDIA : AUGUST 11, 2018/SRAVANA 20, 1940
[PART II—SEC. 3(ii)]
ubZ fnYyh] 6 vxLr] 2018
dk-vk- 1199-—vkS|ksfxd fookn vf/fu;e] 1947 (1947 dk 14) dh èkkjk 17 ds vuqlj.k esa dsUnzh; ljdkj eSllZ
dk.Myk MkWd yscj cksMZ ds çcaèkra=k ds lac¼ fu;kstdksa vkSj muds deZdkjksa ds chp] vuqcaèk esa fu£n"V vkS|ksfxd fookn esa dsUnzh;
ljdkj vkS|ksfxd vfèkdj.k ,oa Je U;k;ky;] vgenkckn ds iapkV (lanHkZ la[;k 1242@2004) dks çdkf'kr djrh gS] tks dsUnzh;
ljdkj dks 01-08-2018 dks çkIr gqvk FkkA
¹la- ,y&37011@3@2001&vkbZvkj (,e)º
Mh- ds- fgeka'kq] voj lfpo
New Delhi, the 6th August, 2018
S.O. 1199.—In pursuance of Section 17 of the Industrial Disputes Act, 1947 (14 of 1947), the Central
Government hereby publishes the Award (Ref. No. 1242/2004) of the Central Government Industrial Tribunal/Labour
Court, Ahmedabad now as shown in the Annexure, in the industrial dispute between the employers in relation to the
management of M/s. Kandla Dock Labour Board and their workman, which was received by the Central Government on
01.08.2018.
[No. L-37011/3/2001-IR (M)]
D. K. HIMANSHU, Under Secy.
ANNEXURE
BEFORE THE CENTRAL GOVERNMENT INDUSTRIAL TRIBUNAL-CUM-LABOUR COURT,
AHMEDABAD
Present :
Pramod Kumar Chaturvedi,
Presiding Officer, CGIT-cum-Labour Court,
Ahmedabad,
Dated 10th July, 2018
Reference: (CGITA) No. 1242/2004
The Deputy Chairman,
Kandla Dock Labour Board,
Shram Deep, Kandla Port,
Kutch (Gujarat) – 370210
…First Party
V/s
The General Secretary,
Transport & Dock Workers Union,
Room No. 21, Yogesh Building,
Ward 12-C, Plot No. 586,
Gandhidham (Gujarat) – 370201
…Second Party
For the First Party No
:
Shri K.V. Gadhia
For the Second Party
:
Shri N.H. Rathod
AWARD
The Government of India/Ministry of Labour, New Delhi by reference adjudication Order No. L-37011/3/2001–
IR(M) dated 09.01.2004 referred the dispute for adjudication to the Industrial Tribunal, Ahmedabad (Gujarat) in respect
of the matter specified in the Schedule:
SCHEDULE
“Whether the action of the management of Kandla Dock Labour Board in not correcting of Date of Birth in
Service Book for all purpose, on the basis of School Leaving Certificate of Shri Kapil Dev R., Workman Wage
No. 38/TD, Kandla is just, valid and legal? If not, to what benefits the workman is entitled for and what other
directions are necessary in the matter?”
1.
The reference was received on 09.01.2004 from Ministry of Labour and Employment, New Delhi for
adjudication. The second party workman submitted the statement of claim on 20.08.2005 and the first party submitted the
written statement Ex. 6 on 10.02.2014. At the stage of evidence, the legal heirs of the deceased workman Kapil Dev R.
¹Hkkx IIµ[k.M 3(ii)º
Hkkjr dk jkti=k % vxLr 11] [email protected] 20] 1940
5103
submitted an application Ex. 7 on 25.09.2017 for substitution as legal heir of the deceased workman Kapil Dev R. who
died on 20.02.2012 that is after 5 years.
2.
The first party filed the objection Ex. 8 submitted that the application for substitution of legal heirs has been
moved after 5 years, hence, the application is time barred.
3.
The legal heirs have not filed any affidavit explaining the delay as to why they are moving the application after a
delay of 5 years. Thus the application is not maintainable, hence rejected.
4.
The reference has also become abate as the legal heirs have not been substituted within the statutory period.
5.
Thus the reference is disposed of as abate.
P. K. CHATURVEDI, Presiding Officer
ubZ fnYyh] 6 vxLr] 2018
dk-vk- 1200-—vkS|ksfxd fookn vf/fu;e] 1947 (1947 dk 14) dh èkkjk 17 ds vuqlj.k esa dsUnzh; ljdkj eSllZ lsUVªy
os;jgkm¯lx dkiksZjs'ku ds çcaèkra=k ds lac¼ fu;kstdksa vkSj muds deZdkjksa ds chp] vuqcaèk esa fu£n"V vkS|ksfxd fookn esa dsUnzh; ljdkj
vkS|ksfxd vfèkdj.k ,oa Je U;k;ky;] vgenkckn ds iapkV (lanHkZ la[;k 1246@2004) dks çdkf'kr djrh gS] tks dsUnzh; ljdkj dks
01-08-2018 dks çkIr gqvk FkkA
¹la- ,y&42011@8@2003&vkbZvkj (,e)º
Mh- ds- fgeka'kq] voj lfpo
New Delhi, the 6th August, 2018
S.O. 1200.—In pursuance of Section 17 of the Industrial Disputes Act, 1947 (14 of 1947), the Central
Government hereby publishes the Award (Ref. No. 1246/2004) of the Central Government Industrial Tribunal/Labour
Court, Ahmedabad now as shown in the Annexure, in the industrial dispute between the employers in relation to the
management of M/s. Central Warehousing Corporation and their workman, which was received by the Central
Government on 01.08.2018.
[No. L-42011/8/2003-IR (M)]
D. K. HIMANSHU, Under Secy.
ANNEXURE
BEFORE THE CENTRAL GOVERNMENT INDUSTRIAL TRIBUNAL-CUM-LABOUR COURT,
AHMEDABAD
Present :
Pramod Kumar Chaturvedi,
Presiding Officer, CGIT-cum-Labour Court,
Ahmedabad,
Dated 03rd July, 2018
Reference: (CGITA) No. 1246/2004
The Manager,
CFS, Central Warehousing Corporation,
Container Freight Stati, Near Kandla Free Trade Zone,
Gandhidham,
Kutch (Gujarat) – 370230
…First Party
V/s
The President,
Akhil Bharatiya Safai Mazdoor Congress,
657, Ward 11, B Dagar Niwas, Maharshi Valmik Nagar,
Gopalpuri, Gandhidham,
Kutch (Gujarat)
…Second Party
For the First Party No
:
Shri Vikram K. Mashar
For the Second Party
:
Shri Prem Kumar Sharma
5104
THE GAZETTE OF INDIA : AUGUST 11, 2018/SRAVANA 20, 1940
[PART II—SEC. 3(ii)]
AWARD
The Government of India/Ministry of Labour, New Delhi by reference adjudication Order No. L-42011/8/2003–
IR(M) dated 12.02.2004 referred the dispute for adjudication to the Industrial Tribunal, Ahmedabad (Gujarat) in respect
of the matter specified in the Schedule:
SCHEDULE
“Whether the demand of Akhil Bharatiya Safai Mazdoor Congress Union regarding regularization of Shri
Ramashray Rangoo Yadav and other 55 workers in CWC (CPC), Kandla is justified? If yes what relief the
workmen are entitled to?”
1.
The reference dates back to 12.02.2004. The second party submitted the statement of claim Ex. 3 on 02.07.2008
and the first party submitted the written statement Ex. 7 on 19.03.2009. The second party also submitted the affidavits of
their witnesses vide Ex. 9 and 10 but the second party never produced the witnesses for cross-examination despite giving
dozens of opportunities since the year 2010.
2.
Thus it appears that the second party is not willing to prosecute the case.
3.
Thus the reference is disposed of in the absence of the evidence of the second party with the observation as
under:”the demand of Akhil Bharatiya Safai Mazdoor Congress Union regarding regularization of Shri Ramashray
Rangoo Yadav and other 55 workers in CWC(CPC), Kandla cannot be said to be justified.”
P. K. CHATURVEDI, Presiding Officer
ubZ fnYyh] 6 vxLr] 2018
dk-vk- 1201-—vkS|ksfxd fookn vf/fu;e] 1947 (1947 dk 14) dh èkkjk 17 ds vuqlj.k esa dsUnzh; ljdkj if'peh
jsyos ds çcaèkra=k ds lac¼ fu;kstdksa vkSj muds deZdkjksa ds chp] vuqcaèk esa fu£n"V vkS|ksfxd fookn esa dsUnzh; ljdkj vkS|ksfxd
vfèkdj.k ,oa Je U;k;ky;] vgenkckn ds iapkV (lanHkZ la[;k 1085@2004) dks çdkf'kr djrh gS] tks dsUnzh; ljdkj dks 06-08-2018
dks çkIr gqvk FkkA
¹la- ,y&41012@116@97&vkbZvkj (ch&I)º
ch- ,l- fc"V] vuqHkkx vf/dkjh
New Delhi, the 6th August, 2018
S.O. 1201.—In pursuance of Section 17 of the Industrial Disputes Act, 1947 (14 of 1947), the Central
Government hereby publishes the Award (Ref. No. 1085/2004) of the Central Government Industrial Tribunal-cum-
Labour Court, Ahmedabad as shown in the Annexure, in the industrial dispute between the management of Western
Railway and their workmen, received by the Central Government on 06.08.2018.
[No. L-41012/116/97-IR (B-I)]
B. S. BISHT, Section Officer
ANNEXURE
BEFORE THE CENTRAL GOVERNMENT INDUSTRIAL TRIBUNAL-CUM-LABOUR COURT,
AHMEDABAD
Present :
Pramod Kumar Chaturvedi,
Presiding Officer, CGIT-cum-Labour Court,
Ahmedabad,
Dated 19th July, 2018
Reference: (CGITA) No. 1085/2004
The Divisional Railway Manager,
Western Railway,
Divisional Office, Ajmer Division,
Ajmer (Rajasthan)
…First Party
V/s
¹Hkkx IIµ[k.M 3(ii)º
Hkkjr dk jkti=k % vxLr 11] [email protected] 20] 1940
5105
The General Secretary,
Western Railway Kamdar Sangh,
T.B.Z. – 17, Gurunagar, Gandhidham,
Kutch (Gujarat) – 370201
…Second Party
For the First Party
:
Shri R.P. Sharma
For the Second Party
:
Shri O.P. Vashishtha
AWARD
The Government of India/Ministry of Labour, New Delhi by reference adjudication Order No. L-41012/116/97–
IR(B-I) dated 11.03.1998 referred the dispute for adjudication to the Industrial Tribunal, Ahmedabad (Gujarat) in respect
of the matter specified in the Schedule:
SCHEDULE
“Whether the demand of the Western Railway Kamdar Sangh, Gandhidham, Kutch against the D.R.M.,
Western Railway, Ajmer for offering appointment on compassionate grounds to the dependent of late
Shri Mohangar, Ex. Mate under PWI, Adasar who died in service on 19.12.1993 valid, just and legal? If so, to
what relief the dependents are entitled to?”
1.
The reference dates back to 11.03.1998 and received on 30.03.1998 from Ministry of Labour and Employment,
New Delhi for adjudication. The second party workman submitted the statement of claim Ex. 3 alleging that the deceased
workman Mohangar Bhupalgar was appointed as Gangman on 01.05.1968 under the control of Permanent Way
Inspector, Adasar under the supervision of the Divisional Railway Manager, Western Railway, Ajmer. He sustained
serious injury in his leg but the Railway Administration did not provide him the proper medical treatment, therefore, he
was taken to the Civil Hospital where his one of the leg was amputated. He remained on long leave without pay. Later his
senior officers advised him to take voluntarily retirement on account of his health with a promise to give job to his son on
compassionate ground for sustaining the family. Therefore, under the advised of the senior Railway Officers, he
submitted his application for voluntarily retirement on 21.07.1993 which was accepted. Thus he was voluntarily retired
with effect from 20.10.1993 and later died on 19.12.1993. The second party, the widow of the deceased workman named
Smt. Parvatiben applied for the employment for compassionate ground but her application has not been considered
favourably till date despite making number of repeated representation. She has further alleged that under the existing
provisions of the Railway Board orders No. E(NG) 111/78/RC-1/1 of 07.04.1983 and 03.09.1983 circulated under the
General Manager, Western Railway, Bombay Order No. E (R&T) 890/60(Policy) Vol. II of 22.04.1983 and 02.11.1983
and the latest Railway Board Order No. E(NG) II/95/RC-I/94 of 22.09.1995 circulated under the General Manager,
Western Railway Bombay Order No. E (R&T) 890/60(Policy) Vol. IV of 22.11.1995/01.12.1995 PS No. 162/95 notified
under Divisional Rail Manager Ajmer Order No. EP 890/0 of 02.01.1996 P.S. No. 162/95 for the consideration of such
cases of dependent sons/Daughters but in this case, the Railway Management adopted the negative attitude to deny the
appointment of son of Late Mohangar Bhupalgar. She has further alleged that the Railway Management earlier has given
such appointment to one Pawan Kumar Yadav as Ticket Collector as Gandhidham in the event of voluntarily retirement
of his father B.L. Yadav, Driver due to his ill health. Similarly, the son of one Guard at Gandhidham namely Late Rai
Amreshwari Prasad was appointed as Assistant Station Master, Gandhidham on the retirement of his father due to ill
health, he was later transferred to North Eastern Railway at his native place. Thus she has prayed that the order of the
demand of Western Railway Kamdar Sangh regarding appointment on compassionate ground of Smt. Parvatiben, widow
of deceased workman Mohangar Bhupalgar be declared as legal and justified and also to order the appointment of her
son on compassionate ground.
2.
The first party Western Railway submitted the written statement Ex.7 and submitted that the present reference
does not come under the term of Industrial Disputes under Section 2 (k) of the Industrial Disputes Act. The first party
cannot be defined as Industry as defined in Section 2 (j) of the Industrial Disputes Act. The deceased workman took
voluntarily retirement, therefore, he is a retired employee, therefore, cannot be terms as workman under Section 2 (k) of
the Industrial Disputes Act. It is further submitted that the deceased Mohangar Bhupalgar voluntarily retired on
20.10.1993 and died after retirement, therefore, Smt. Parvatiben or her son cannot be appointed on compassionate
ground.
3.
On the basis of the pleadings of both the parties, the following issues are to be decided:
I.
Whether the demand of the Western Railway Kamdar Sangh, Gandhidham, Kutch against the D.R.M.,
Western Railway, Ajmer for offering appointment on compassionate grounds to the dependent of late Shri
Mohanagar, Ex. Mate under PWI, Adasar who died in service on 19.12.1993 is valid, just and legal?
II.
To what relief, if any, the workman is entitled?
5106
THE GAZETTE OF INDIA : AUGUST 11, 2018/SRAVANA 20, 1940
[PART II—SEC. 3(ii)]
4.
Issue No. I & II: Both the issues are interrelated, therefore, decided together. The burden of prove of these issues
was lying on the second party. The second party examined Smt. Parvatiben who reiterated the averments made in the
statement of claim and has not stated anything contrary in her cross-examination.
5.
The first party submitted the affidavits of Nandkishor Bholaram Kharti and Krishankumar Verma vide Ex. 27 and
28 respectively stating that the workman Mohangar Bhupalgar died after taking voluntarily retirement, therefore, the
provisions of the rules regarding appointment on compassionate ground does not apply in the case. It is also noteworthy
that the second party or her advocate did not appear to cross-examine the witnesses of the first party despite sending the
copies of the affidavit to the General Secretary of the second party union, Shri O.P. Vashishtha.
6.
I considered the matter in the light of the evidence on record as it is an admitted fact that the deceased workman
died after retirement, therefore, appointment on compassionate ground cannot be ordered in the case.
7.
Thus the reference is disposed of with the observation as under: “the demand of the Western Railway Kamdar
Sangh, Gandhidham, Kutch against the D.R.M., Western Railway, Ajmer for offering appointment on compassionate
grounds to the dependent of late Shri Mohanagar, Ex. Mate under PWI, Adasar who died in service on 19.12.1993 is not
valid, just and legal.”
8.
Thus no relief can be granted. The award is passed accordingly.
P. K. CHATURVEDI, Presiding Officer
ubZ fnYyh] 6 vxLr] 2018
dk-vk- 1202-—vkS|ksfxd fookn vf/fu;e] 1947 (1947 dk 14) dh èkkjk 17 ds vuqlj.k esa dsUnzh; ljdkj if'peh
jsyos ds çcaèkra=k ds lac¼ fu;kstdksa vkSj muds deZdkjksa ds chp] vuqcaèk esa fu£n"V vkS|ksfxd fookn esa dsUnzh; ljdkj vkS|ksfxd
vfèkdj.k ,oa Je U;k;ky;] vgenkckn ds iapkV (lanHkZ la[;k 149@2006) dks çdkf'kr djrh gS] tks dsUnzh; ljdkj dks 06-08-2018
dks çkIr gqvk FkkA
¹la- ,y&41011@09@2005&vkbZvkj (ch&I)º
ch- ,l- fc"V] vuqHkkx vf/dkjh
New Delhi, the 6th August, 2018
S.O. 1202.—In pursuance of Section 17 of the Industrial Disputes Act, 1947 (14 of 1947), the Central
Government hereby publishes the Award (Ref. No. 149/2006) of the Central Government Industrial Tribunal-cum-
Labour Court, Ahmedabad as shown in the Annexure, in the industrial dispute between the management of Western
Railway and their workmen, received by the Central Government on 06.08.2018.
[No. L-41011/09/2005-IR (B-I)]
B. S. BISHT, Section Officer
ANNEXURE
BEFORE THE CENTRAL GOVERNMENT INDUSTRIAL TRIBUNAL-CUM-LABOUR COURT,
AHMEDABAD
Present :
Pramod Kumar Chaturvedi,
Presiding Officer, CGIT-cum-Labour Court,
Ahmedabad,
Dated 19th July, 2018
Reference: (CGITA) No. 149/2006
1.
The Chief Store Controller,
Western Railway,
Church Gate,
Mumbai
2.
The Deputy Store Controller,
Western Railway,
Sabarmati,
Ahmedabad (Gujarat)
…First Party
V/s
¹Hkkx IIµ[k.M 3(ii)º
Hkkjr dk jkti=k % vxLr 11] [email protected] 20] 1940
5107
The General Secretary,
Paschim Railway Karmachari Parishad,
E-209, Sarvottamnagar, Sabarmati,
Ahmedabad (Gujarat)
…Second Party
For the First Party
:
Shri H.R. Raval
For the Second Party
:
Shri R.S. Sisodiya
AWARD
The Government of India/Ministry of Labour, New Delhi by reference adjudication Order No. L-41011/09/2005–
IR(B-I) dated 19.07.2006 referred the dispute for adjudication to the Industrial Tribunal, Ahmedabad (Gujarat) in respect
of the matter specified in the Schedule:
SCHEDULE
“Whether the action of the management of Western Railway in imposing the penalty of removal from service
on Shri S.M. Vyas w.e.f. 08.11.2000 is justified? If not, what relief he is entitled to?”
1.
The reference dates back to 19.07.2006 and received on 11.08.2006 from Ministry of Labour and Employment,
New Delhi for adjudication.
2.
In response to the notice Ex. 2, the second party submitted the statement of claim Ex. 12 on 05.08.2010 and the
first party submitted the written statement Ex. 14 on 14.10.2011.
3.
The case was listed for evidence of the second party but today on 19.07.2018, Shri R.S. Sisodiya, the General
Secretary of the second party union Paschim Railway Karmachari Parishad, Ahmedabad, , did not press the reference.
4.
Hence the reference is disposed of as not pressed.
P. K. CHATURVEDI, Presiding Officer
ubZ fnYyh] 6 vxLr] 2018
dk-vk- 1203-—vkS|ksfxd fookn vf/fu;e] 1947 (1947 dk 14) dh èkkjk 17 ds vuqlj.k esa dsUnzh; ljdkj if'peh
jsyos ds çcaèkra=k ds lac¼ fu;kstdksa vkSj muds deZdkjksa ds chp] vuqcaèk esa fu£n"V vkS|ksfxd fookn esa dsUnzh; ljdkj vkS|ksfxd
vfèkdj.k ,oa Je U;k;ky;] vgenkckn ds iapkV (lanHkZ la[;k 150@2013) dks çdkf'kr djrh gS] tks dsUnzh; ljdkj dks 06-08-2018
dks çkIr gqvk FkkA
¹la- ,y&41011@54@2013&vkbZvkj (ch&I)º
ch- ,l- fc"V] vuqHkkx vf/dkjh
New Delhi, the 6th August, 2018
S.O. 1203.—In pursuance of Section 17 of the Industrial Disputes Act, 1947 (14 of 1947), the Central
Government hereby publishes the Award (Ref. No. 150/2013) of the Central Government Industrial Tribunal-cum-
Labour Court, Ahmedabad as shown in the Annexure, in the industrial dispute between the management of Western
Railway and their workmen, received by the Central Government on 06.08.2018.
[No. L-41011/54/2013-IR (B-I)]
B. S. BISHT, Section Officer
ANNEXURE
BEFORE THE CENTRAL GOVERNMENT INDUSTRIAL TRIBUNAL-CUM-LABOUR COURT,
AHMEDABAD
Present :
Pramod Kumar Chaturvedi,
Presiding Officer, CGIT-cum-Labour Court,
Ahmedabad,
Dated 19th July, 2018
Reference: (CGITA) No. 150/2013
5108
THE GAZETTE OF INDIA : AUGUST 11, 2018/SRAVANA 20, 1940
[PART II—SEC. 3(ii)]
The Divisional Railway Manager,
Western Railway,
Mumbai Central,
Mumbai
…First Party
V/s
The President,
Paschim Railway KarmachariParishad,
28/B, Narain Park,
Behind Chandkheda Railway Station, Sabarmati,
Ahmedabad (Gujarat) – 382470
…Second Party
For the First Party
:
None
For the Second Party
:
Shri R.S. Sisodiya
AWARD
The Government of India/Ministry of Labour, New Delhi by reference adjudication Order No. L-41011/54/2013–
IR(B-I) dated 01.08.2013 referred the dispute for adjudication to the Industrial Tribunal, Ahmedabad (Gujarat) in respect
of the matter specified in the Schedule:
SCHEDULE
“Whether the demand of Paschim Railway Karmachari Parishad to give salary to Shri Indersingh D., Sr.
P/Man working under the control of Station Master, Western Railway, Navsari which reduced w.e.f. 1976 vide
letter dated August, 1991 and give the pay of Rs.3950/- instead of Rs.3850/- w.e.f. 31.12.2005 and to make the
payment which deducted from his salary is legal, proper and just? If so, to what relief the concerned workman
Shri Indersingh D.is entitled to?”
1.
The reference dates back to 01.08.2013 and received on 17.08.2013 from Ministry of Labour and Employment,
New Delhi for adjudication. The second party submitted the statement of claim Ex. 2 alleging that the workman
Indersingh D. was initially appointed in the year 1976 and was granted temporary status vide letter no. BCIM
No. E/891/4 dated 20.02.1976 fixing his pay in the pay scale of Rs. 196-231/-. Later the first party revised the pay and
fixed his wages at Rs. 196/- from 12.08.1982 on the ground that the employer had not granted temporary status. Thus the
order was illegal and liable to be set aside and quashed. Thus he has prayed for seeking direction to the first party
employer to grant the workman the scale of Rs.196/- w.e.f. 1976 declaring the order of the first party dated 20.12.2008 as
illegal. He has further prayed that the workman be fixed in the pay scale of Rs.6200-20200/- with a grade pay of
Rs.1900/- and basis pay of Rs.10120/-.
2.
The first party despite service of notice did not submit the written statement, therefore, the reference was ordered
to proceed ex-parte on 06.07.2017 against the first party.
3.
The second party union submitted the affidavit Ex. 5 of workman Indersingh D. reiterating the averments made in
the statement of claim and submitting that he was appointed on 20.02.1976 in the pay scale of Rs. 196-232/- reducing his
basis pay at Rs. 196/- w.e.f. 12.08.1982 without giving him any information. He has also stated that his pay was also
reduced w.e.f. 20.12.2008 and his pay was also wrongly fixed at Rs. 3850/- in place of Rs.3950/- w.e.f. 31.12.2005. He
has also filed the copies of the fixation of pay which appears to have been communicated to him at the relevant time but
he did not challenge the orders of fixation of pay at different time in any higher forum despite the fact that the pay was
fixed several years ago. Therefore, the reference is barred by the principle of estoppel being moved the reference after
accepting the pay fixation at the relevant time.
4.
Therefore, the reference has no force and disposed of with the observation as under: “the demand of Paschim
Railway Karmachari Parishad to give salary to Shri Indersingh D., Sr. P/Man working under the control of Station
Master, Western Railway, Navsari which reduced w.e.f. 1976 vide letter dated August, 1991 and give the pay of
Rs.3950/- instead of Rs.3850/- w.e.f. 31.12.2005 and to make the payment which deducted from his salary is not legal,
proper and just.
5.
Thus no relief can be granted. The award is passed accordingly.
P. K. CHATURVEDI, Presiding Officer
ubZ fnYyh] 6 vxLr] 2018
dk-vk- 1204-—vkS|ksfxd fookn vf/fu;e] 1947 (1947 dk 14) dh èkkjk 17 ds vuqlj.k esa dsUnzh; ljdkj if'peh
jsyos ds çcaèkra=k ds lac¼ fu;kstdksa vkSj muds deZdkjksa ds chp] vuqcaèk esa fu£n"V vkS|ksfxd fookn esa dsUnzh; ljdkj vkS|ksfxd
¹Hkkx IIµ[k.M 3(ii)º
Hkkjr dk jkti=k % vxLr 11] [email protected] 20] 1940
5109
vfèkdj.k ,oa Je U;k;ky;] vgenkckn ds iapkV (lanHkZ la[;k 41@2014) dks çdkf'kr djrh gS] tks dsUnzh; ljdkj dks 06-08-2018
dks çkIr gqvk FkkA
¹la- ,y&41011@14@2014&vkbZvkj (ch&I)º
ch- ,l- fc"V] vuqHkkx vf/dkjh
New Delhi, the 6th August, 2018
S.O. 1204.—In pursuance of Section 17 of the Industrial Disputes Act, 1947 (14 of 1947), the Central
Government hereby publishes the Award (Ref. No. 41/2014) of the Central Government Industrial Tribunal-cum-Labour
Court, Ahmedabad as shown in the Annexure, in the industrial dispute between the management of Western Railway and
their workmen, received by the Central Government on 06.08.2018.
[No. L-41011/14/2014-IR (B-I)]
B. S. BISHT, Section Officer
ANNEXURE
BEFORE THE CENTRAL GOVERNMENT INDUSTRIAL TRIBUNAL-CUM-LABOUR COURT,
AHMEDABAD
Present :
Pramod Kumar Chaturvedi,
Presiding Officer, CGIT-cum-Labour Court,
Ahmedabad,
Dated 19th July, 2018
Reference: (CGITA) No. 41/2014
1.
The Divisional Railway Manager,
Western Railway, Pratapnagar,
Baroda (Gujarat)
2.
The Manager,
Allahabad Bank, Shahjalpur (Shikohabad),
Farrukabad (Utter Predesh)
…First Party
V/s
The Dy. General Secretary,
Paschim Railway KarmachariParishad,
28/B, Narain Park,
Behind Chandkheda Railway Station, Sabarmati,
Ahmedabad (Gujarat)
..….….Second Party
For the First Party No
:
None
For the Second Party
:
Shri R.S. Sisodiya
AWARD
The Government of India/Ministry of Labour, New Delhi by reference adjudication Order No. L-41011/14/2014–
IR(B-I) dated 25.03.2014 referred the dispute for adjudication to the Industrial Tribunal, Ahmedabad (Gujarat) in respect
of the matter specified in the Schedule:
SCHEDULE
“Whether the demand of Paschim Railway Karmachari Parishad for correct pay fixation of Shri Rameshwar
Dayal, Retd. ELF, Gr. I by the management of Divisional Railway Manager, Western Railway, Baroda is
justified? If so, to what relief the workman is entitled to?”
1.
The reference dates back to 25.03.2014 and received on 11.04.2014 from Ministry of Labour and Employment,
New Delhi for adjudication. In pursuance of the notice, the second party union Paschim Railway Karmachari Parishad
submitted the statement of claim Ex. 6 alleging that the workman named Rameshwa rDayal retired as ELF Gr. I under
Divisional Railway Manager, Western Railway, Pratapnagar, Baroda. The workman Rameshwar Dayal was fixed with
the basis pay of Rs.1760/- in the pay scale of Rs.1320-2040/- but he was denied the basis pay of Rs.1760/- despite the
fact that a employee junior to him was fixed at the basis pay of Rs.1850/- in the pay scale of Rs.1320-1340/-. Later he
5110
THE GAZETTE OF INDIA : AUGUST 11, 2018/SRAVANA 20, 1940
[PART II—SEC. 3(ii)]
was promoted to the post of ELF, Gr. I on 29.11.1995 but without considering his basis pay at Rs.1760/- and to fix his
pay at Rs. 5400/- on promotion, he was given basis pay of Rs.4300/- at the time of promotion. He made number of
representation but to no result.
2.
The first party was served vide acknowledgement Ex. 4. The other first party Allahabad Bank returned the notice
sent to him. The first party Western Railway did not file the reply or written statement, therefore, on 06.01.2017, the
reference was ordered to proceed ex-parte against the first party.
3.
The second party in support of his statement of claim Ex. 6, submitted the affidavit Ex. 8 stating the reasons
regarding depriving him the correct pay and pension fixation.
4.
The second party union has not filed the copies of the fixation of pay and pension and the relevant circulars
regarding the fixation of pay, therefore, in the light of the affidavit Ex. 8, the Divisional Railway Manager, Western
Railway, Pratapnagar, Baroda is directed to consider the affidavit Ex. 8 of the workman Rameshwar Dayal and to pass
appropriate order within 30 days from the publication of the award.
5.
The award is passed accordingly.
P. K. CHATURVEDI, Presiding Officer
ubZ fnYyh] 6 vxLr] 2018
dk-vk- 1205-—vkS|ksfxd fookn vf/fu;e] 1947 (1947 dk 14) dh èkkjk 17 ds vuqlj.k esa dsUnzh; ljdkj Hkkjrh; LVsV
cSad ds çcaèkra=k ds lac¼ fu;kstdksa vkSj muds deZdkjksa ds chp] vuqcaèk esa fu£n"V vkS|ksfxd fookn esa dsUnzh; ljdkj vkS|ksfxd
vfèkdj.k ,oa Je U;k;ky;] vgenkckn ds iapkV (lanHkZ la[;k 469@2004) dks çdkf'kr djrh gS] tks dsUnzh; ljdkj dks 06-08-2018
dks çkIr gqvk FkkA
¹la- ,y&12012@404@2001&vkbZvkj (ch&I)º
ch- ,l- fc"V] vuqHkkx vf/dkjh
New Delhi, the 6th August, 2018
S.O. 1205.—In pursuance of Section 17 of the Industrial Disputes Act, 1947 (14 of 1947), the Central
Government hereby publishes the Award (Ref. No. 469/2004) of the Central Government Industrial Tribunal-cum-
Labour Court, Ahmedabad as shown in the Annexure, in the industrial dispute between the management of State Bank of
India and their workmen, received by the Central Government on 06.08.2018.
[No. L-12012/404/2001-IR (B-I)]
B. S. BISHT, Section Officer
ANNEXURE
BEFORE THE CENTRAL GOVERNMENT INDUSTRIAL TRIBUNAL-CUM-LABOUR COURT,
AHMEDABAD
Present :
Pramod Kumar Chaturvedi,
Presiding Officer, CGIT-cum-Labour Court,
Ahmedabad,
Dated 17th July, 2018
Reference: (CGITA) No. 469/2004
1.
The Branch Manager,
State Bank of India,
Pragatinagar Branch, Ankur Road, Naranpura,
Ahmedabad (Gujarat)– 380001
2.
The Regional Manager,
State Bank of India,
Regional Office,
Nr. C.N. Vidhyalaya, Ambavadi,
Ahmedabad (Gujarat)- 380001
…First Party
V/s
¹Hkkx IIµ[k.M 3(ii)º
Hkkjr dk jkti=k % vxLr 11] [email protected] 20] 1940
5111
Shri Chirayush Manubhai Bhavsar,
B-10/2, Swagat Apartment,
Opp. Bhavsar Society, Nava Vadaj,
Ahmedabad (Gujarat) – 380001
…Second Party
For the First Party
:
Shri B.K. Oza
For the Second Party
:
Shri Priyank P. Jhaveri
AWARD
The Government of India/Ministry of Labour, New Delhi by reference adjudication Order No. L-12012/
404/2001–IR(B-I) dated 11.03.2002 referred the dispute for adjudication to the Industrial Tribunal, Ahmedabad (Gujarat)
in respect of the matter specified in the Schedule:
SCHEDULE
“Whether the action of the management of State Bank of India, Ankur Road, Ahmedabad in discontinuing the
service of Shri Chirayush Manubhai Bhavsar w.e.f. 08.05.2001 without following the provisions of Section
25 F, G and H of the Industrial Disputes Act, 1947 is justified? If not, what relief the concerned workman is
entitled?”
1.
The reference dates back to 11.03.2002 and received on 05.09.2002 from Ministry of Labour and Employment,
New Delhi for adjudication.
2.
Both the parties submitted the statement of claim and written statement on different dates. The case was listed for
evidence of the second party but today on 17.07.2018, both the parties jointly submitted a settlement Ex. 14 which was
read over and explained to both the parties. The parties admitted the terms of settlement; hence the settlement was
accepted by the Tribunal. The settlement reveals that the first party bank has agreed to pay Rs.165000/- (Rupees One Lac
Sixty Five Thousand) to the second party workman Chirayush Manubhai Bhavsar towards full and final settlement.
3.
Thus the reference is finally disposed of in terms of settlement Ex. 14. The settlement Ex. 14 shall remains the
part of final award.
P. K. CHATURVEDI, Presiding Officer
ubZ fnYyh] 6 vxLr] 2018
dk-vk- 1206-—vkS|ksfxd fookn vf/fu;e] 1947 (1947 dk 14) dh èkkjk 17 ds vuqlj.k esa dsUnzh; ljdkj if'peh
jsyos ds çcaèkra=k ds lac¼ fu;kstdksa vkSj muds deZdkjksa ds chp] vuqcaèk esa fu£n"V vkS|ksfxd fookn esa dsUnzh; ljdkj vkS|ksfxd
vfèkdj.k ,oa Je U;k;ky;] vgenkckn ds iapkV (lanHkZ la[;k 60@2017) dks çdkf'kr djrh gS] tks dsUnzh; ljdkj dks 06-08-2018
dks çkIr gqvk FkkA
¹la- ,y&41011@20@2017&vkbZvkj (ch&I)º
ch- ,l- fc"V] vuqHkkx vf/dkjh
New Delhi, the 6th August, 2018
S.O. 1206.—In pursuance of Section 17 of the Industrial Disputes Act, 1947 (14 of 1947), the Central
Government hereby publishes the Award (Ref. No. 60/2017) of the Central Government Industrial Tribunal-cum-Labour
Court, Ahmedabad as shown in the Annexure, in the industrial dispute between the management of Western Railway and
their workmen, received by the Central Government on 06.08.2018.
[No. L-41011/20/2017-IR (B-I)]
B. S. BISHT, Section Officer
ANNEXURE
BEFORE THE CENTRAL GOVERNMENT INDUSTRIAL TRIBUNAL-CUM-LABOUR COURT,
AHMEDABAD
Present :
Pramod Kumar Chaturvedi,
Presiding Officer, CGIT-cum-Labour Court,
Ahmedabad,
Dated 13th July, 2018
Reference: (CGITA) No. 60/2017
5112
THE GAZETTE OF INDIA : AUGUST 11, 2018/SRAVANA 20, 1940
[PART II—SEC. 3(ii)]
1.
The Divisional Railway Manager,
Western Railway,
Divisonal Office, Asarwa, Nr. Chamunda Bridge,
Ahmedabad (Gujarat)
2.
The Assistant Divisional Engineer(NW),
Western Railway,
Divisonal Office, Asarwa, Nr. Chamunda Bridge,
Ahmedabad (Gujarat)
3.
The Chief Medical Officer,
Railway Hospital, Western Railway,
Sabarmati, D Cabin,
Ahmedabad (Gujarat)
…First Party
V/s
The Joint Divisional Secretary,
Paschim Railway Karmachari Parishad,
28/B, Narayan Park,
Behind Chandkheda Railway Station, Sabarmati,
Ahmedabad (Gujarat) – 382470
…Second Party
For the First Party No
:
None
For the Second Party
:
None
AWARD
The Government of India/Ministry of Labour, New Delhi by reference adjudication Order No. L-41011/20/2017–
IR(B-I) dated 30.06.2017 referred the dispute for adjudication to the Industrial Tribunal, Ahmedabad (Gujarat) in respect
of the matter specified in the Schedule:
SCHEDULE
“Whether the demand of Joint Divisional Secretary, Paschim Railway Karmachari Parishad, Ahmedabad to
reschedule the Promotion Seniority List of workmen for cadre restructuring from Track Maintaner Gr. IV to Track
Maintaner Gr. III is legal, fair and justified? If yes, then what relief the union/workman is entitled to and what
other directions are necessary in the matter?”
1.
The reference dates back to 30.06.2017 and received on 11.07.2017 from Ministry of Labour and Employment,
New Delhi for adjudication. All the parties issued notice Ex. 2 on 03.01.2018 to appear on 08.03.2018 to file their claims.
Acknowledgement slips of second party union and first party no. 1 & 3 were also received vide Ex. 3, 4 & 5 respectively.
But the second party union did not prefer to file the statement of claim; however, Shri Yogi Gadhia filed his vakalatpatra
Ex. 6 on behalf of the first party no. 1. Thereafter, 3 more opportunities were given to the second party union to file its
statement of claim but to no result.
2.
Thus it appears that the second party union is not willing to prosecute with the reference.
3.
Thus the reference is disposed of in the absence of the statement of claim and non-prosecution of the case by the
second party union with the observation as under: “the demand of Joint Divisional Secretary, Paschim Railway
Karmachari Parishad, Ahmedabad to reschedule the Promotion Seniority List of workmen for cadre restructuring from
Track Maintaner Gr. IV to Track Maintaner Gr. III can be said to be illegal, unfair and unjustified.”
P. K. CHATURVEDI, Presiding Officer
ubZ fnYyh] 6 vxLr] 2018
dk-vk- 1207-—vkS|ksfxd fookn vf/fu;e] 1947 (1947 dk 14) dh èkkjk 17 ds vuqlj.k esa dsUnzh; ljdkj if'peh
jsyos ds çcaèkra=k ds lac¼ fu;kstdksa vkSj muds deZdkjksa ds chp] vuqcaèk esa fu£n"V vkS|ksfxd fookn esa dsUnzh; ljdkj vkS|ksfxd
vfèkdj.k ,oa Je U;k;ky;] vgenkckn ds iapkV (lanHkZ la[;k 42@2011) dks çdkf'kr djrh gS] tks dsUnzh; ljdkj dks 06-08-2018
dks çkIr gqvk FkkA
¹la- ,y&41011@93@2010&vkbZvkj (ch&I)º
ch- ,l- fc"V] vuqHkkx vf/dkjh
¹Hkkx IIµ[k.M 3(ii)º
Hkkjr dk jkti=k % vxLr 11] [email protected] 20] 1940
5113
New Delhi, the 6th August, 2018
S.O. 1207.—In pursuance of Section 17 of the Industrial Disputes Act, 1947 (14 of 1947), the Central
Government hereby publishes the Award (Ref. No. 42/2011) of the Central Government Industrial Tribunal-cum-Labour
Court, Ahmedabad as shown in the Annexure, in the industrial dispute between the management of Western Railway and
their workmen, received by the Central Government on 06.08.2018.
[No. L-41011/93/2010-IR (B-I)]
B. S. BISHT, Section Officer
ANNEXURE
BEFORE THE CENTRAL GOVERNMENT INDUSTRIAL TRIBUNAL-CUM-LABOUR COURT,
AHMEDABAD
Present :
Pramod Kumar Chaturvedi,
Presiding Officer, CGIT-cum-Labour Court,
Ahmedabad,
Dated 06th July, 2018
Reference: (CGITA) No. 42/2011
1.
The Divisional Railway Manager,
Western Railway,
Pratapnagar,
Baroda (Gujarat) –390004
2.
The Assistant Engineer,
Western Railway,
Godhra (Gujarat) – 389001
…First Party
V/s
The President,
General Workmen’s Union,
Sinduri Mata Devasthan, Post Godhra,
Panchmahal (Gujarat) – 389001
…Second Party
For the First Party No
:
Shri Rajesh Singh Thakur
For the Second Party
:
Shri J.K. Ved
AWARD
The Government of India/Ministry of Labour, New Delhi by reference adjudication Order No. L-41011/93/2010–
IR(B-I) dated 02.05.2011 referred the dispute for adjudication to the Industrial Tribunal, Ahmedabad (Gujarat) in respect
of the matter specified in the Schedule:
SCHEDULE
“Whether the action of the management of Divisional Railway Manager, Western Railway, Baroda, in not
paying family pension and other dues to Smt. Jeliben Jenabhai Parmar w/o late Shri Jenabhai Parmar, Ex-
Gangman, who died while in service on 28.09.1973, is legal and justified? To what relief the widow of
workman is entitled?”
1.
The reference was received on 02.05.2011 from Ministry of Labour and Employment, New Delhi for
adjudication. The second party submitted the statement of claim Ex. 3 on 09.10.2011 along with authority letter Ex. 4 of
Shri J.K. Ved, union representative. The first party submitted the written statement Ex. 7 on 07.03.2018 along with
vakalatpatra Ex. 6 of Shri Rajesh Singh Thakur, advocate. Since then, the case was listed for evidence of second party.
2.
Today on 06.07.2018, Shri J.K. Ved on behalf of the second party requested the tribunal to withdraw the case.
3.
Thus the reference is disposed of as withdrawn.
P. K. CHATURVEDI, Presiding Officer
5114
THE GAZETTE OF INDIA : AUGUST 11, 2018/SRAVANA 20, 1940
[PART II—SEC. 3(ii)]
ubZ fnYyh] 6 vxLr] 2018
dk-vk- 1208-—vkS|ksfxd fookn vf/fu;e] 1947 (1947 dk 14) dh èkkjk 17 ds vuqlj.k esa dsUnzh; ljdkj bZLV dkWLV
jsyos ds çcaèkra=k ds lac¼ fu;kstdksa vkSj muds deZdkjksa ds chp] vuqcaèk esa fu£n"V vkS|ksfxd fookn esa dsUnzh; ljdkj vkS|ksfxd
vfèkdj.k ,oa Je U;k;ky;] Hkqous'oj ds iapkV (lanHkZ la[;k 15@2010) dks çdkf'kr djrh gS] tks dsUnzh; ljdkj dks 06-08-2018 dks
çkIr gqvk FkkA
¹la- ,y&41012@12@2009&vkbZvkj (ch&I)º
ch- ,l- fc"V] vuqHkkx vf/dkjh
New Delhi, the 6th August, 2018
S.O. 1208.—In pursuance of Section 17 of the Industrial Disputes Act, 1947 (14 of 1947), the Central
Government hereby publishes the Award (Ref. No. 15/2010) of the Central Government Industrial Tribunal-cum-Labour
Court, Bhubaneswar as shown in the Annexure, in the industrial dispute between the management of East Coast Railway
and their workmen, received by the Central Government on 06.08.2018.
[No. L-41012/12/2009-IR (B-I)]
B. S. BISHT, Section Officer
ANNEXURE
CENTRAL GOVERNMENT INDUSTRIAL TRIBUNAL-CUM-LABOUR COURT, BHUBANESWAR
Present:
Shri B.C. Rath,
Presiding Officer, C.G.I.T.-cum-Labour
Court, Bhubaneswar
INDUSTRIAL DISPUTE CASE NO. 15/2010
Date of Passing Award – 25th June, 2018
Between:
1.
M/s. General Security & Information
Services (P) Ltd., At. 7/C Abinash, Ch. Banerjee Lane,
East Beliaghatta, Kolkatta – 700 010.
2.
The General Manager,
East Coast Railway, At. Rail Vihar
Chandrasekharpur, Bhubaneswar, Orissa
…1st Party-Managements
(And)
Their Workman, Shri Shakti Prasanna Panigrahi & 5 others,
C/o. Ramesh Ch. Panigrahi, Sarbodaya Nagar,
Po. & Dist. Puri.
…2nd Party-Workmen
Appearances:
None
…
For the 1st Party-Management No. 1
M/s. D. Mohanty, Advocate
…
For the 1st Party-Management No. 2.
Shri S.R. Panigrahi,
…
For the 2nd Party- Workmen
One of the Workmen.
AWARD
The Government of India in the Ministry of Labour vide its letter No. L-27012/19/2015-IR(M), dated 22.01.2016
in exercising its authority conferred by clause (d) of sub-section (1) and sub-section 2(A) of Section 10 of the Industrial
Disputes Act, 1947 (herein after referred to as “The Act”) have referred for an adjudication of a dispute “whether persons
employed by the management of M/s. General Security & Information Services (P) Ltd. Rly Contractor who have raised
¹Hkkx IIµ[k.M 3(ii)º
Hkkjr dk jkti=k % vxLr 11] [email protected] 20] 1940
5115
the dispute of termination are discharging managerial functions as contended by the management or are discharging
duties of workmen satisfying definition of Section 2(s) of the Act? (2) If the persons are discharging duties of workmen,
whether the action of the management of General Security & Information in terminating services of S/Shri Shakti
Prasanna Panigrahi, Soumya Ranjan Panigrahi, Natabar Pradhan, Anad Rosan Guria, Sunil Kumar Behera, Paresh
Chandra Padhi w.e.f. 24.3.2008 without following the provisions of the I.D. Act, 1947, is legal and justified? If not, to
what relief the workmen concerned entitled to”?
2.
The case of the disputant workmen, in short, as revealed from their statement of claim is that the 1st Party-
Management No. 1 having been selected as a contractor by the 1st Party-Management No. 2 was entrusted to wash and
clean railway coaches inside the depot shed of East Coast Railway at Bhubaneswar from the year 2005 on-wards.
Accordingly, the Contractor Management No. 1 engaged more than 200 persons to execute the contract work. It has
been claimed by the disputant workmen that the workman Shakti Prasad Panigrahi joined in the Management No. 2 on
1.12.2005 as office in-charge, the workman Soumya Ranjan Panigraphi joined on 1.1.2006 as Shift in-charge, workmen
namely S/Shri Natabar Pradhan, Azad Rosan Guria and Sunil Kumar Behera joined on 1.4.2007 as Cleaners and
workman Shri Paresh Ch. Padhi joined on 1.4.2007 as Shift in-charge in the establishment of the Management No. 2. The
workmen 1, 2 and 6 were receiving a monthly salary of Rs. 3400/- whereas the workmen at 3, 4 and 5 were getting a
monthly salary of Rs. 2700/- on their joining. Provident Fund contributions including E.S.I. were deducted from their
salary. They are stated to have been working in the establishment of the Management No. 1 continuously and
uninterruptedly till their services are terminated on 24.3.2008. According to the disputant provisions of Section 25-F i.e.
notice and retrenchment compensation were not paid to them when their services were terminated despite they had
worked for more than 240 days continuously in a preceding twelve calendar months. Thus, their
termination/retrenchment being in violation of Section 25-F is illegal and unjustified. As such, they are entitled to be
reinstated with back wages and other service benefits.
3.
On being noticed the Managements contested the claim and filed separate written statements. Management No. 1
filed its written statement challenging the claim on a contention that his organization was entrusted the contract work of
washing and cleaning of railway coaches in a tender process. The workman No. 1, 2 and 6 were engaged as supervisory
staff whereas workman No. 3, 4 and 5 joined as daily wagers/labours knowingly fully that they were engaged on the
basis of “no work no pay”. As they did not discharge their duty satisfactorily and complaints were received against them
regularly for negligence in duty on their part, they were shifted and posted at Vishakpatnam to perform the same type of
jobs entrusted to them at Bhubaneswar. It is the stand of the Management No. 1 that the disputant workmen did not
report to their duty at Vishakpatnam and they have abandoned their service voluntarily. There was no termination of
service of the disputant workmen and as they had left their job on their own accord, question of compliance of the
provisions of Section 25-F does not arise in the case. In its written statement the Management No. 2 has denied their
liability taking a stand that in no point of time the disputant workmen were ever engaged by him. As there was no
relationship of “employer and employee” between him and the disputant workmen, question does not arise for
termination of service by him. According to him the Management No. 2 entered into a contract vide agreement No. 17,
dated 22.7.2005 to clean the coaches with effect from 1.6.2005 to 28.2.2007. The said Management was again out-
sourced for the period from 20.3.2007 to 19.3.2012 to clean railway coaches. The disputant might have been engaged by
the said contractor agency and as such, the Management No. 2 is no way liable for violation of any provision of the I.D.
Act. After filing of written statements the Management No. 1 did not participate in the proceeding for which he has been
set exparte. However, the Management No. 2 has contested the claim and also adduced evidence to refute the stand of the
disputant workmen.
4.
On the aforesaid pleadings of the parties the issues mentioned below have been settled for adjudication of the
dispute.
I S S U E S
1.
Whether the persons employed by the management of M/s. General Security & Information Services (P)
Ltd. Rly. Contractor who have raised the dispute of termination and discharging managerial functions as
contended by the management or are discharging duties of workmen satisfying definition of Section 2(s) of
the Act?
2.
If the persons are discharging duties of workmen, whether the action of the management of General
Security & Information in terminating services of S/Shri Shakti Prasanna Panigrahi, Soumya Ranjan
Panigrahi, Natabar Pradhan, Anad Rosan Guria, Sunil Kumar Behera, Paresh Chandra Padhi with effect
from 24.3.2008 without following the provisions of the I.D. Act, 1947, is legal and justified?
3.
If not, to what relief the workmen concerned entitled to?
5.
In order to substantiate their claim the disputant workmen have adduced oral evidence examining the disputants
Shri Soumya Ranjan Panigrahi and Shakti Prasanna Panigrahi as W.W.-1 and W.W.-2 and produced documents like
copy of the appointment as office in-charge for Bhubaneswar Coaching Depot dated 2.2.2007, copy of the duty allotment
5116
THE GAZETTE OF INDIA : AUGUST 11, 2018/SRAVANA 20, 1940
[PART II—SEC. 3(ii)]
order of S.P. Panigrahi of dated 2.2.2007, copy of the duty allotment order to S.R. Panigrahi dated 27.12.2006 and copy
of the duty allotment order to P.C. Padhi on 27.7.2007 which are marked as Ext.-1 to Ext.-4. On the other hand, the
Management No. 2 has examined Shri K. Sudarsan, A.D.M.E., E.Co. Railway, Bhubaneswar to refute the allegations.
F I N D I N G S
6.
For the sake of convenience all the issues are taken up together for their consideration.
The first ground of objection to the maintainability of the reference is that the disputants being entrusted with the
work of Supervisor cannot be covered by the term “workman” as defined under section 2(s) of the Act. On a careful
examination of the pleadings of the parties and the evidence adduced on behalf of the 2nd party-workmen it is seen that
there is no serious dispute to the claim of disputants that two of them i.e. W.W.-1 and W.W.-2 were making entries in
registers and other official records and they were also supervising the work of labours including other disputants engaged
in cleaning and washing of the railway coaches. Such supervision of work being executed by labours cannot be said to
be a managerial function or work by any stretch of imagination. Further, it is apparent from Ext.-2 & 3 which are the
official orders of Management No. 1 passed in course of administration that W.W.-1 and disputant Shri Padhi were asked
to see the attendance of the employees in their shifts and to maintain records in regard to distribution of work to the
employees. They are to maintain the stock of machine and materials and they are to furnish statement in regard to
progress of work. That apart, they were receiving monthly salary of Rs. 3400/- and Rs. 2700/- respectively and no
employee of managerial cadre was not expected to receive such wages which appears to be less than minimum wages
fixed for a skilled labour in the prevalent year. The evidence of the Management No. 2 as well as its pleading is totally
silent as to the nature of duties discharged by each disputant workman whereas the Management No. 1 is set exparte and
as such there is no evidence on its behalf to demolish the oral evidence of the 2nd party workmen that they were engaged
in the category of “workmen”. In the above back-drops the Issue No. 1 is answered in favour of the disputant workmen.
7.
Though, the disputant W.W.-1 and W.W.-2 have claimed in their examination in chief that they were retrenched
from their services, in their cross examination they have admitted that on being transferred to Vishakpatnam and Assam
they did not report to their new place of assignment. Further, it is emerging from the appointment letter (Ext.-1) issued in
favour of W.W.-1 that his period of appointment was five years from the date of his joining in view of contractual
agreement between Management No. 1 and 2. Admittedly, no appointment letters of other disputant workmen are
produced before the Tribunal. However, the evidence of workmen witnesses are not seriously challenged as to their
employment in the establishment of Management No. 1. There is also no serious challenge to the claim of the disputant
workmen and their evidence that they were working continuously for more than 240 days in a calendar year before their
alleged retrenchment. It is elicited from cross examination of W.W.-1 and W.W.-2 that they were transferred to
Vishakpatnam and Assam respectively. But, they did not report to their duty. It has been pleaded by the Management No.
2 that the workmen were never refused employment or retrenched and it is its specific stand that they did not report to
their new place of assignment and as such, they are found to have abandoned their jobs on their own accord. Ext.-1 is the
copy of the appointment order issued in favour of W.W.-1. On a close reading of the said order it is found that the
disputant was posted to work in the office of the Branch Manager of Bhubaneswar Depot and his scale of pay was fixed
as per the guidelines of East Coast Railway. Further, it has been mentioned in Ext.-2 that his appointment was
exclusively for Bhubaneswar Depot and not transferable, though the period of appointment was for five years. Be that as
it may, the appointment of other disputants can be safely presumed to be not transferable and their place of posting was
exclusively for Bhubaneswar Depot. Hence, any order of transfer by the Management No. 2 is apparently a violation of
service condition and the same can be treated as unfair labour practice if no consent is obtained from the concerned
workman for his transfer. Though claim has been advanced by the Management No. 1 in his written statement that the
disputants were never refused employment/engagement, there is no evidence on its part to show that the disputants were
ever noticed or departmentally proceeded with for their non-reporting to their duties. Pleading is also advanced by the
Management No. 2 that the disputants were transferred as their performances were not satisfactory and complaints were
received against them. But, no document or evidence in this regard is advanced and as such, any order of transfer on the
part of the Management No. 2 cannot be sustainable in the eye of law when the terms of appointment prohibits such
transfer. It is the oral testimony of W.W.-1 and W.W.-2 that they were refused engagement on 24.03.2008. Any transfer
order in violation to the terms and conditions of the appointment letter in the case at hand would amount to refusal of
employment. Undisputedly, the disputants were not paid any notice pay or retrenchment compensation when they were
transferred and asked to join elsewhere than Bhubaneswar. Further, they had worked for more than 240 days in a
calendar year preceding to the date of their transfer. In the above back-drops it can be safely be said that the alleged
retrenchment was in violation of the provisions of Section 25-F of the Act since the period/term of appointment was not
completed. It is in evidence and pleading of the parties that the disputants were engaged in the year 2006 and 2007
whereas they were asked to join in their new place of assignment on 24.3.2008. Thus, their retrenchment or refusal of
employment at Bhubaneswar without notice pay and retrenchment compensation is illegal and unjustified.
8.
Coming to the issue of relief to which the disputants are entitled it is seen that as per Ext.-1 the period of
employment was for only five years whereas the workmen are found to have worked for the Management No. 2
continuously for a maximum period of two years. As per the settled principles reinstatement is not automatic in cases of
¹Hkkx IIµ[k.M 3(ii)º
Hkkjr dk jkti=k % vxLr 11] [email protected] 20] 1940
5117
all illegal termination/retrenchment. Direction of reinstatement is usually depends upon various factors like nature and
terms of appointment, period of engagement, availability of work with the Management, facts and circumstances under
which the alleged termination or retrenchment was taken place and other factors. In the case at hand the Management
No. 2 had a work order for five years which is stated to have been completed in the year 2012. There is no evidence on
the part of the disputant workmen that the Management No. 2 is still entrusted with the work of cleaning and washing
railway coaches at Bhubaneswar. They have worked only for two years and term of their appointment was for five years
only. Having regard to the above facts and circumstances in my considered view it is not a fit case for directing
reinstatement of the disputant workmen. However, the retrenchment apparently being illegal and in violation of Section
25-F the disputants are entitled to receive compensation of Rs. 50,000/- each which appears to be just and appropriate
taking into consideration of their terms of appointment and the period for which they had worked for the Management
No. 1. Now it is to be seen who is to bear the expenses towards payment of compensation to the disputant workmen.
9.
As it appears from the pleadings and evidence of the parties that there is no serious dispute to the fact that the
Management No. 1 was out-sourced by the Management No. 2 for cleaning the railway coaches inside the depot shed of
East Coast Railway at Bhubaneswar and in turn, the disputants workmen were employed by the Management No. 1 for
cleaning and for supervision of such work. As per the pleadings and evidence of the disputant workmen no role was
played by the Management No. 1 in employment or appointment of the disputants in such work. There is no pleading or
evidence to claim that the Management No. 2 was ever controlling or supervising the individual work of the disputants or
there was employer and employee relationship between the Management No. 2 and the disputant workmen. In that view
of the matter the liability of the Management No. 2 is only limited to ensure payment of prescribed minimum wages to
the disputant workmen as per provision of Contract Labour Act. There is nothing substantial in the evidence of the
disputant workmen that there was any latches or lapses on the part of the Management No. 2 for which they were
deprived of prescribed minimum wages from their employer contractor. Further, no allegation in this regard has been
raised either in the claim statement or in oral testimonies of the disputant workmen. Their only grievances is that their
services were terminated illegally without proper compliance of the provisions of Section 25-F despite they worked for
more than 240 days continuously in the establishment of the Management No. 1 in a preceding twelve calendar months
before their disengagement. In that view of the matter the Management of Railway (Management No. 2) has no liability
to pay the compensation. The Management No. 1 being the employer of the disputant workmen are liable to pay the
compensation.
10.
Hence, it is ordered. The Management No. 1 is directed to pay the compensation of Rs. 50,000/- (Rupees Fifty
Thousand) only to each of the disputant workmen for their illegal retrenchment. The said compensation shall be paid
within three months from the date of publication of the award failing which the workmen are directed to receive interest
at the rate of 8% per annum on the compensation amount with effect from the date of publication of the award.
11.
Reference is answered accordingly. A copy of the award be sent immediately as per Rule for publication. Free
copy of the award be also furnished to the parties after its notification.
Dictated & Corrected by me.
B. C. RATH, Presiding Officer
ubZ fnYyh] 6 vxLr] 2018
dk-vk- 1209-—vkS|ksfxd fookn vf/fu;e] 1947 (1947 dk 14) dh èkkjk 17 ds vuqlj.k esa dsUnzh; ljdkj if'peh
jsyos ds çcaèkra=k ds lac¼ fu;kstdksa vkSj muds deZdkjksa ds chp] vuqcaèk esa fu£n"V vkS|ksfxd fookn esa dsUnzh; ljdkj vkS|ksfxd
vfèkdj.k ,oa Je U;k;ky;] vgenkckn ds iapkV (lanHkZ la[;k 73@2012) dks çdkf'kr djrh gS] tks dsUnzh; ljdkj dks 06-08-2018
dks çkIr gqvk FkkA
¹la- ,y&41011@04@2012&vkbZvkj (ch&I)º
ch- ,l- fc"V] vuqHkkx vf/dkjh
New Delhi, the 6th August, 2018
S.O. 1209.—In pursuance of Section 17 of the Industrial Disputes Act, 1947 (14 of 1947), the Central
Government hereby publishes the Award (Ref. No. 73/2012) of the Central Government Industrial Tribunal-cum-Labour
Court, Ahmedabad as shown in the Annexure, in the industrial dispute between the management of Western Railway and
their workmen, received by the Central Government on 06.08.2018.
[No. L-41011/04/2012-IR (B-I)]
B. S. BISHT, Section Officer
5118
THE GAZETTE OF INDIA : AUGUST 11, 2018/SRAVANA 20, 1940
[PART II—SEC. 3(ii)]
ANNEXURE
BEFORE THE CENTRAL GOVERNMENT INDUSTRIAL TRIBUNAL-CUM-LABOUR COURT,
AHMEDABAD
Present :
Pramod Kumar Chaturvedi,
Presiding Officer, CGIT-cum-Labour Court,
Ahmedabad,
Dated 05th July, 2018
Reference: (CGITA) No. 73/2012
The Divisional Railway Manager,
Western Railway,
Pratapnagar,
Baroda (Gujarat)
…First Party
V/s
The President,
Paschim Railway Karmachari Parishad,
28/B, Narayan Park, Behind Chandkheda Railway Station,
Sabarmati,
Ahmedabad (Gujarat)
… Second Party
For the First Party
: Shri N.J. Acharya
For the Second Party
: None
AWARD
The Government of India/Ministry of Labour, New Delhi by reference adjudication Order No. L-41011/04/2012–
IR(B-I) dated 29.03.2012 referred the dispute for adjudication to the Industrial Tribunal, Ahmedabad (Gujarat) in respect
of the matter specified in the Schedule:
SCHEDULE
“Whether the action of the management of Western Railway, Baroda in not granting family pension to the
widow of late Shri Muthuswami Marimuthu, Gangman who died on 09.10.1986 while in service, is legal and
justified? To what relief the widow of deceased workman is entitled?”
1.
The reference was received on 29.03.2012 from Ministry of Labour and Employment, New Delhi for
adjudication. In response to the notice, the second party union The President, Paschim Railway Karmachari Parishad,
28/B, Narayan Park, Behind Chandkheda Railway Station, Sabarmati, Ahmedabad, hereinafter referred to as “Union”,
submitted the statement of claim Ex. 3 on 04.10.2012 alleging that the second party workman Muthuswami Marimuthu
working as Gangman in the first party Western Railway hereinafter referred to as “Western Railway”, died on
09.10.1986. The dispute was raised before the Conciliation Officer cum Assistant Commissioner of Labour for
conciliation as his widow was denied the family pension. The dispute ended in failure; therefore, Conciliation Officer
cum Assistant Commissioner of Labour forwarded the matter to the Ministry of Labour and Employment, New Delhi for
referring to CGIT-cum-Labour Court for adjudication. The Ministry of Labour and Employment send the reference to
CGIT-cum-Labour Court as given in the aforesaid schedule for adjudication.
2.
The brief facts of the case in the statement of claim Ex. 3 are that the workman Muthuswami Marimuthu was
initially appointed on 14.11.1975 as Gangman. He served the first party till 09.10.1986 when he died after completing
more than 240 days in each calendar year. He died on duty; therefore, his wife submitted an application for
compassionate appointment in place of her late husband. The western railway considered the case of the widow of the
deceased workman and appointed her on compassionate ground but she was denied the benefits of family pension despite
the service rules. The second party union mentioned the Rule 75 of Railway Service (Pension) Rules, 1993 in statement
of claim which is reproduced as under:
“(1) The Provisions of this rule shall apply:-
(a)
To a railway servant entering service in a pensionable establishment on or after 01st of January,
1964; and
(b)
To a railway servant who was in service on the 31st of December, 1963 and came to be governed by
the provisions of the Family Pension the Scheme for railway employees, 1964, contained in
¹Hkkx IIµ[k.M 3(ii)º
Hkkjr dk jkti=k % vxLr 11] [email protected] 20] 1940
5119
Railway Board’s letter No. F(P)63PN-1/40, dated the 02nd of January, 1964 as in force immediately
before the commencement of these rules.
Note: The provisions of this rule have also been extended from 22nd of September, 1977, to railway
servants on pensionable establishments who retired or died before the 31st of December, 1963 and
also to those who were alive on that date but had opted out of the 1964 scheme.
(2)
Without prejudice to the provisions contained in Sub-rule (3), where a railway servant dies:-
(a)
After completion of one year of continuous service, or
(b)
Before completion of one year of continuous service provided the deceased railway servant
concerned immediately prior to his appointment to the service or post was examined by the
appropriate medical authority and declared fit by that authority for railway service.
(c)
After retirement from service and was on the date of death in receipt of pension, or compassionate
allowance, referred to in Chapter V, other than the pension referred in Rule 53.”
3.
It is further alleged that despite the aforesaid rules, the widow of the deceased workman was denied for family
pension; therefore, the union has prayed to grant the family pension to the widow of deceased workman objecting the
appearance of the advocate of the first party in the proceedings.
4.
Despite the aforesaid objections to the appearance of the advocate of the first party in the proceedings, Shri N.J.
Acharya , advocate submitted his vakalatpatra Ex.4 on behalf of the first party Western Railway but did not prefer to
submit the written statement, therefore, on 16.09.2016, the reference was ordered to proceed ex-parte against the first
party Western Railway.
5.
In support of the statement of claim, the widow named Tanna Pakyam of the deceased workman submitted her
affidavit Ex. 5 reiterating the averments made in the statement of claim Ex. 3 briefly stating that her husband was
working as Gangman since 14.11.1975 and died on 09.10.1986 while working on duty after serving for more than 10
years.
6.
In support of the averments made in the statement of claim, the second party union referred the judgement of the
apex court in Prabhawati Devi V/s Union of India, 1996(A) Service Law Reporter, Page 28 wherein the apex court has
held that deceased kept working as substitute till the time of his death on 05.01.1987 and acquired certain rights and
privileges under Rule 2318 of the rules of Railway Establishment will entitle his widow and children to the benefit of
family pension.
7.
Thus in the light of the aforesaid rules and law, the widow Tanna Pakyam of the deceased workman Muthuswami
Marimuthu is entitled for the benefits of family pension in the absence of the objections of the first party Western
Railway.
8.
Thus the reference is disposed of with the observation as under: “the action of the management of Western
Railway, Baroda in not granting family pension to the widow of late Shri Muthuswami Marimuthu, Gangman who died
on 09.10.1986 while in service, is illegal and unjustified.
9.
The first party Western Railway is directed to determine and sanction the family pension to the widow named
Tanna Pakyam of the deceased workman Muthuswami Marimuthu as per the rules within 60 days from the publication of
the award.
10.
The award is passed accordingly.
P. K. CHATURVEDI, Presiding Officer
ubZ fnYyh] 6 vxLr] 2018
dk-vk- 1210-—vkS|ksfxd fookn vf/fu;e] 1947 (1947 dk 14) dh èkkjk 17 ds vuqlj.k esa dsUnzh; ljdkj eSllZ nhid
vkSj daiuh ds çcaèkra=k ds lac¼ fu;kstdksa vkSj muds deZdkjksa ds chp] vuqcaèk esa fu£n"V vkS|ksfxd fookn esa dsUnzh; ljdkj vkS|ksfxd
vfèkdj.k ,oa Je U;k;ky; la- 1] fnYyh ds iapkV (lanHkZ la[;k 12@2018) dks çdkf'kr djrh gS] tks dsUnzh; ljdkj dks 06-08-2018
dks çkIr gqvk FkkA
¹la- ,y&41012@19@2017&vkbZvkj (ch&I)º
ch- ,l- fc"V] vuqHkkx vf/dkjh
New Delhi, the 6th August, 2018
S.O. 1210.—In pursuance of Section 17 of the Industrial Disputes Act, 1947 (14 of 1947), the Central
Government hereby publishes the Award (Ref. No. 12/2018) of the Central Government Industrial Tribunal-cum-Labour
5120
THE GAZETTE OF INDIA : AUGUST 11, 2018/SRAVANA 20, 1940
[PART II—SEC. 3(ii)]
Court No. 1, Delhi as shown in the Annexure, in the industrial dispute between the management of M/s. Deepak and
Company and their workmen, received by the Central Government on 06.08.2018.
[No. L-41012/19/2017-IR (B-I)]
B. S. BISHT, Section Officer
ANNEXURE
BEFORE PRESIDING OFFICER: CENTRAL GOVERNMENT INDUSTRIAL TRIBUNAL-CUM-LABOUR
COURT No.1: ROOM No. 511, DWARKA COURT COMPLEX, SECTOR 10, DWARKA, DELHI – 110 075
ID No. 12/2018
Shri Manoj Sahni S/o Shri Ram Dev Sahni,
C/o Shri Sunil Kumar, Advocate,
F-609, Karkardooma Court,
Delhi – 110 032
…Workman
Versus
M/s Deepak and Company, through
Its Proprietor Shri Rakesh Gupta,
7226, Main Qutub Road,
Near Nabi Karim Police Station,
Delhi – 110 055
…Management
AWARD
Central Government, vide letter No.L-41012/19/2017-IR(DU) dated 04.01.2018, referred the following industrial
dispute to this Tribunal for adjudication:
“Whether the action of the management of IRCTC and their contractor M/s Deepak & Co., Delhi in
terminating the services of the workman Shri Manoj Sahni S/o Shri Ram Dev Sahni is fair and legal? If not,
what relief the workman concerned is entitled to?
2.
In the reference order, the appropriate Government commanded the party/ies raising the dispute to file statement
of claim, complete with relevant documents, list of reliance and witnesses with this Tribunal within 15 days of receipt of
the reference order and to forward a copy of such statement of claim to the opposite parties involved in the dispute.
Despite directions so given, Shri Manoj Sahni opted not to file his claim statement with the Tribunal.
3.
Further, on receipt of the above reference, notice was also sent to the workman as well as the management.
Neither the postal article, referred above, was received back nor was it observed by the Tribunal that postal services
remained affected in the period, referred above. Therefore, every presumption lies in favour of the fact that the above
notice was served upon the workman. Despite service of the notice, the workman opted to abstain away from the
proceedings. No claim statement was filed on his behalf. Thus, it is clear that the workman is not interested in
adjudication of the reference on merits.
4.
Since the workman has neither put in his appearance nor has he led any evidence so as to prove his cause against
the management, as such, this Tribunal is left with no choice, except to pass a ‘No Dispute/Claim’ award. An award is,
accordingly, passed. Let this award be sent to the appropriate Government, as required under Section 17 of the Industrial
Disputes Act, 1947, for publication.
Dated : June 11, 2018
A. C. DOGRA, Presiding Officer
ubZ fnYyh] 6 vxLr] 2018
dk-vk- 1211.—vkS|ksfxd fookn vf/fu;e] 1947 (1947 dk 14) dh èkkjk 17 ds vuqlj.k esa dsUnzh; ljdkj lSUVªy cSad
vkWiQ bafM;k ds çcaèkra=k ds lac¼ fu;kstdksa vkSj muds deZdkjksa ds chp] vuqcaèk esa fu£n"V vkS|ksfxd fookn esa dsUnzh; ljdkj vkS|ksfxd
vfèkdj.k@Je U;k;ky;] dkuiqj (m-iz-) ds iapkV (lanHkZ la[;k 81@2014) dks çdkf'kr djrh gS] tks dsUnzh; ljdkj dks 06-08-2018
dks çkIr gqvk FkkA
¹la- ,y&12011@42@2014&vkbZvkj (ch&II)º
jfo dqekj] vuqHkkx vf/dkjh
¹Hkkx IIµ[k.M 3(ii)º
Hkkjr dk jkti=k % vxLr 11] [email protected] 20] 1940
5121
New Delhi, the 6th August, 2018
S.O. 1211.—In pursuance of Section 17 of the Industrial Disputes Act, 1947 (14 of 1947), the Central
Government hereby publishes the Award (Ref. No. 81/2014) of the Central Government Industrial Tribunal-cum-Labour
Court, Kanpur (U.P.) as shown in the Annexure, in the industrial dispute between the management of Central Bank of
India and their workmen, received by the Central Government on 06.08.2018.
[No. L-12011/42/2014-IR (B-II)]
RAVI KUMAR, Section Officer
ANNEXURE
BEFORE SRI SHUBHENDRA KUMAR, HJS, PRESIDING OFFICER, CENTRAL GOVERNMENT
INDUSTRIAL TRIBUNAL-CUM-LABOR COURT, KANPUR
Industrial Dispute No. 81 of 2014
Between :
Member,
State Committee of UP Bank Workers Org.
3/13 Mathura Nagar,
Agra.
And
Regional Manager,
Central Bank of India,
Sanjay Place,
Agra.
AWARD
1.
Central Government Mol, New Delhi, vide notification no. L-12011/42/2014-IR(B-II) dated 27.06.14, has referred
the following dispute to this tribunal for adjudication-
2.
Whether the action of the management of Central Bank of India in depriving the opportunity of promotion of
Sri Pappu Lal Verma, SWO posted in Jaddari Branch, Aligarh for the post of Assistant Manager is just and proper
and if not to what relief the concerned workman is entitled?
3.
The case of the Union as set up on behalf of workman Sri Pappu Lal Verma is that the worker is posted as SWO at
Jattari Branch, District Aligarh of the bank. It is alleged that an examination for promotion at the post of Assistant
Branch Manager, was conducted by the bank on All India Basis on 28.02.12 and the worker also has submitted his
application form prior to 5 days from the date of commencement of examination. On 25.06.12 it came to the
notice of the worker the written examination for promotion had already been conducted on 24.06.12.On coming to
know regarding conduct of written examination, the worker through proper channel submitted a representation
addressed to the General Manager of the Bank but the branch manager refused to accept the representation of the
worker then the worker submitted his representation through registered post. As the worker is an active trade
union member, therefore, with malafide intention he was deprived from promotion test deliberately by the
authorities of the bank without any basis which is illegal and liable to be struck down.
4.
Accordingly it is prayed by the union that the worker be deemed to have been promoted at the post of Assistant
Manager, JMGS-I in the bank.
5.
The management of bank has submitted its written statement in which it is pleaded that since the worker has failed
to submit his application within stipulated time i.e. 26.04.12, subsequently he submitted his request through fax on
02.05.12, which was not considered by the Regional Office of the bank, hence question of his appearance in the
written test does not arise. As such union is not entitled for any relief for its worker Sri Pappu Lal Verma and
accordingly its claim being misconceived and baseless is liable to be rejected.
6.
In this case no rejoinder has been filed by the Union in support of its claim.
7.
Union has filed affidavit of worker Sri Pappu Lal Verma along with the claim statement but worker did not appear
for his cross examination, therefore, his cross examination was made nil. Management has also not adduced any
evidence.
8.
Both the parties have not filed any documentary evidence.
9.
I have heard the authorized representation for the anagement. None appeared on behalf of the uion to advance
their arguments.
5122
THE GAZETTE OF INDIA : AUGUST 11, 2018/SRAVANA 20, 1940
[PART II—SEC. 3(ii)]
10.
As it is evident from the record that union has raised the dispute on behalf of worker alleging that he was deprived
of from the opportunity of promotion, therefore, heavy burden lies on uioin to addue evidence in support of its
case.
11.
Union has not filed any documentary evidence and has only filed affidavit of worker prematurely along with the
claim statement and worker himself absented for his cross examination therefore, his evidence cannot be read
against the management.
12.
As such there is no evidence on behalf of worker on the record and therefore, reference is bound to be decided
against the Union.
13.
Award is passed accordingly in the above terms.
SHUBHENDRA KUMAR, Presiding Officer
ubZ fnYyh] 6 vxLr] 2018
dk-vk- 1212.—vkS|ksfxd fookn vf/fu;e] 1947 (1947 dk 14) dh èkkjk 17 ds vuqlj.k esa dsUnzh; ljdkj lSUVªy cSad
vkWiQ bafM;k ds çcaèkra=k ds lac¼ fu;kstdksa vkSj muds deZdkjksa ds chp] vuqcaèk esa fu£n"V vkS|ksfxd fookn esa dsUnzh; ljdkj vkS|ksfxd
vfèkdj.k@Je U;k;ky;] dkuiqj (m-iz-) ds iapkV (lanHkZ la[;k 84@2012) dks çdkf'kr djrh gS] tks dsUnzh; ljdkj dks 06-08-2018
dks çkIr gqvk FkkA
¹la- ,y&12012@28@2012&vkbZvkj (ch&II)º
jfo dqekj] vuqHkkx vf/dkjh
New Delhi, the 6th August, 2018
S.O. 1212.—In pursuance of Section 17 of the Industrial Disputes Act, 1947 (14 of 1947), the Central
Government hereby publishes the Award (Ref. No. 84/2012) of the Central Government Industrial Tribunal-cum-Labour
Court, Kanpur (U.P.) as shown in the Annexure, in the industrial dispute between the management of Central Bank of
India and their workmen, received by the Central Government on 06.08.2018.
[No. L-12012/28/2012-IR (B-II)]
RAVI KUMAR, Section Officer
ANNEXURE
BEFORE SRI SHUBHENDRA KUMAR, HJS, PRESIDING OFFICER, CENTRAL GOVERNMENT
INDUSTRIAL TRIBUNAL-CUM-LABOR COURT, KANPUR
Industrial Dispute No. 84 of 2012
Between :
Sri Sandeep Kumar Savita,
S/o Late Siya Ram Savita,
R/o Village Utaripura, Post Uttaripura,
Distt. Kanpur Nagar(UP)
AND
The Regional Manager,
Central Bank of India,
117/H-1/240, Pandu Nagar,
Kanpur (U.P.)-208005
AWARD
1.
Central Government, MOL, vide notification No. 12012/28/2012-IR (B-II) dated 21.09.2012 has referred the
following dispute for adjudication to this Tribunal.
2.
“Whether the action of the management of Central Bank of India, Kanpur in terminating the services of
Shri Sandeep Kumar Savita S/o Late Siya Ram Savita workman with effect from 05.05.2007 is just fair & legal?
What relief the workman concerned is entitled to?”
3.
The case of the worker Sri Sandeep Kumar in short is that he was engaged by the opposite party bank for the first
time at Extension Counter Bilhaur Inter College of Uttaripura Branch, Kanpur Nagar, on 20.01.2001 at the post of
peon. It is alleged that the extension counter of Uttaripura Branch was opened in Janaury 2001 and the worker was
engaged at the time of opening of the branch and at the time of engagement of the worker he was told that since
¹Hkkx IIµ[k.M 3(ii)º
Hkkjr dk jkti=k % vxLr 11] [email protected] 20] 1940
5123
the branch is new one and he will be soon regularized but he was not regularized in the service of the bank and he
was terminated from the service from of the bank with effect from 05.05.07. The bank took from the worker all
duties of peon during the business hours. The work and conduct of the worker was remained outstanding and
satisfactory and he did not give any room for complaint. It is alleged by the worker that from the date of his
engagement i.e. 22.01.01 till 04.05.07 and with effect from 05.05.07 he was removed from the service of the bank
without any notice and notice pay which is nothing but a retrenchment in the eye of law. He has further stated that
after his disengagement one Sri Ganga Singh Kushwaha was engaged at his place. As such the action of the
opposite party is unfair labor practice and is not sustainable in the eye of law, therefore, he has prayed for his
reinstatement in the service of the bank with full back wages and all consequential benefits.
4.
Management bank has filed written statement in which it is stated that the worker by use and misuse of the
provisions of Industrial Disputes Act and with a view to create a undue pressure on the bank has raised the present
industrial dispute. There does not exist any relationship of master and servant between the bank and the worker,
therefore, dispute is liable to be rejected. Considering the provisions of section 25-B of the Act which defines
continuous service, the case of the worker does not cover under the perview of section 25F of the Act as the
worker has never worked for 240 days of continuous service in the Extension counter of the bank. The worker was
not engaged by the bank against any post nor was he ever issued any appointment letter by the bank. The opposite
party bank has denied the entire claim of the worker in totality and the engagement of Sri Ganga Singh Kushwaha
is not trustworthy and as such is liable to be rejected. Allegation of Unfair Labor Practice against the management
is absolutely denied by the bank as the same has been raised by the worker to give color to his claim. The opposite
party bank has therefore, prayed that there is no merit in the claim of the worker as such is liable to be rejected
being devoid of merit.
5.
Rejoinder statement has also been filed by the worker but nothing new has been narrated therein except reiterating
the facts pleaded by him in the claim petition.
6.
Worker vide list paper no. 8/1 has filed photocopies of letter dated 06.0-2.03, 28.02.0-3 and 18.09.03, photocopies
of payment vouchers and photocopies of Dak register and in this way the worker in all has filed photocopies of
111 papers under the above heads.
7.
The opposite party under the order of the tribunal dated 27.08.15 has filed the original of attendance register.
8.
Worker in support of his case has examined himself as w.w.1 whereas the management has examined Sri
Jogeshwar Bajpai its officer as M.W.1 in support of its case.
9.
I have heard the arguments of both the sides and have also gone through the record of the case.
10.
Authorized representative for the worker contented that the worker Sandeep Kumar Savita was appointed on the
post of peon on 22.01.2001 in extension counter of the Bank at Bilhaur and he has continuously worked for six
years in the bank and by oral order dated 5.05.2007, his services were terminated which is illegal and he has
challenged his termination from the service of the Bank.
11.
Authorized representative for the management contended that worker was never appointed on the post of peon nor
has been issued any appointment letter nor was engaged for any post and there does not exit any relationship of
master and servant between the bank and the worker.
12.
Worker has examined himself as WW1 who has deposed in his cross-examination that his services were
terminated on 5.05.2007. He has further admitted that he has not filed any documents to prove his working in the
preceding years of his termination that is 2006-07. He does not remember whether he has filed documents to
prove his continuous working of 240 days. He has admitted that he was not given any appointment letter. He has
further admitted that the documents which he has filed is for the period January 2001 to August 2002 does not
bear signatures of any officers of the Bank. He has also filed copy of Dak registers for the year 2003-04 on which
there appears no signatures or seal of the Bank. He has further admitted in clear words that Bank has filed original
Attendance Register for the period 2001-07 on his application for summoning it and after perusal of the register
this witness has deposed that his name does not find place in the attendance register nor it bears his signature.
13.
Management has examined Sri Jogeshwar Bajpai as MW1 who has deposed that in the extension counter besides
branch manager and head cashier a sweeper used to work and he has denied that worker Sandeep Kumar Savita
used to bring cash from main branch to extension counter and he was paid the expenses through vouchers.
14.
One very important aspect of matter is that the worker if had been appointed as peon by the management, he
should have been issued an appointment letter and he should have marked his attendance in the Attendance
Register and he would have been paid his salary as an employee of the Bank but worker has admitted that he was
not issued any appointment letter and his signature and name does not find place in the attendance register and
thirdly he has not mentioned in his claim petition nor in his evidence as to how he has been paid salary of a peon.
5124
THE GAZETTE OF INDIA : AUGUST 11, 2018/SRAVANA 20, 1940
[PART II—SEC. 3(ii)]
15.
He has deposed that he was being paid expenses through vouchers for the miscellaneous work that was performed
by him but no such vouchers are filed. The worker has filed photocopies of same documents which does not bear
signature or seal of the Bank authorities and are denied by the Bank management. Worker has not summoned any
other witness of the management to prove these documents, therefore, these documents of which photocopies
have been filed by the worker is of no help to him.
16.
It may be possible that the worker might have worked as casual labor with the bank for which payment was done
through vouchers. As discussed above, no such vouchers are filed by the worker. Secondly to have a right on
working as a casual labor it is necessary for the worker to prove that he has worked for 240 days continuously
preceding 12 calendar months from the date of termination but worker Sandeep Kumar Savita has admitted
himself in his cross-examination that his services were terminated on 5.05.2007 and he has not filed any
documents to prove his working in the year 2006-07. Further he has stated that he does not remember whether he
has filed any documents to prove his continuous working for 240 days.
17.
Thus from the above discussion the Tribunal is of the view that worker Sandeep Kumar Savita has failed to prove
that he was appointed as peon in 2001 and his services were illegally terminated on 5.05.2007. Further he has
failed to prove that he has worked continuously for 240 days.
18.
Consequently considering the facts and circumstances of the case coupled with evidence of the party it is held that
the worker is not entitled for any relief.
19.
Award is made accordingly.
SHUBHENDRA KUMAR, Presiding Officer
ubZ fnYyh] 6 vxLr] 2018
dk-vk- 1213.—vkS|ksfxd fookn vf/fu;e] 1947 (1947 dk 14) dh èkkjk 17 ds vuqlj.k esa dsUnzh; ljdkj cSad vkWiQ
bafM;k ds çcaèkra=k ds lac¼ fu;kstdksa vkSj muds deZdkjksa ds chp] vuqcaèk esa fu£n"V vkS|ksfxd fookn esa dsUnzh; ljdkj vkS|ksfxd
vfèkdj.k@Je U;k;ky;] vgenkckn (xqtjkr) ds iapkV (lanHkZ la[;k 498@2004) dks çdkf'kr djrh gS] tks dsUnzh; ljdkj dks
06-08-2018 dks çkIr gqvk FkkA
¹la- ,y&12011@39@2002&vkbZvkj (ch&II)º
jfo dqekj] vuqHkkx vf/dkjh
New Delhi, the 6th August, 2018
S.O. 1213.—In pursuance of Section 17 of the Industrial Disputes Act, 1947 (14 of 1947), the Central
Government hereby publishes the Award (Ref. No. 498/2004) of the Central Government Industrial Tribunal-cum-
Labour Court, Ahmedabad (Gujarat) as shown in the Annexure, in the industrial dispute between the management of
Bank of India and their workmen, received by the Central Government on 06.08.2018.
[No. L-12011/39/2002-IR (B-II)]
RAVI KUMAR, Section Officer
ANNEXURE
BEFORE THE CENTRAL GOVERNMENT INDUSTRIAL TRIBUNAL-CUM-LABOUR COURT,
AHMEDABAD
Present :
Pramod Kumar Chaturvedi,
Presiding Officer, CGIT-cum-Labour Court,
Ahmedabad,
Dated 06th July, 2018
Reference: (CGITA) No. 498/2004
The Chief Manager,
Bank of India,
Navrangpura Branch, Swastik Society Char Rasta,
Ahmedabad (Gujarat) – 380009
…First Party
V/s
¹Hkkx IIµ[k.M 3(ii)º
Hkkjr dk jkti=k % vxLr 11] [email protected] 20] 1940
5125
The General Manager,
Bank of India Staff Union, C/o Bank of India,
Ahmedabad and Gujarat Branches, Bhadra,
Ahmedabad (Gujarat) – 380001
…Second Party
For the First Party
:
None
For the Second Party
:
None
AWARD (CORRIGENDUM)
The Government of India/Ministry of Labour, New Delhi by reference adjudication Order No. L-12011/39/2002-
IR(B-II) dated 18.06.2002 referred the dispute for adjudication to the Industrial Tribunal, Ahmedabad (Gujarat) in
respect of the matter specified in the Schedule:
SCHEDULE
“Whether the action of the management of Bank of India through the Chief Manager, Ahmedabad in
terminating the services of Shri Y.N. Pandit by way of Compulsory Retirement is legal, proper and justified?
If not, what relief the workman concerned is entitled to?”
1.
The reference dates back to 18.06.2002. The second party submitted the statement of claim Ext. 3 on 14.08.2002
and the first party submitted the written statement Ext. 8 in April, 2005. Since then the second party has been absent and
has also not lead his evidence. Thus it appears that the second party has no willingness to prosecute the case.
2.
Therefore, the reference in the absence of the evidence of the second party workman is disposed of with the
observation as under: “the action of the management of Bank of India through the Chief Manager, Ahmedabad in
terminating the services of Shri Y.N. Pandit by way of Compulsory Retirement is legal, proper and justified.”
3.
The award passed on 03.01.2017 suffers with the clerical mistake that the name of workman Y.N. Pandit is
wrongly typed which ought to have been Y.N. Parikh. Thus the name of the workman must be read as Y.N. Parikh in
the award.
4.
Thus the reference in the absence of the evidence of the second party workman is disposed of with the observation
as under: “the action of the management of Bank of India through the Chief Manager, Ahmedabad in terminating the
services of Shri Y.N. Parikh by way of Compulsory Retirement is legal, proper and justified.”
P. K. CHATURVEDI, Presiding Officer
ubZ fnYyh] 6 vxLr] 2018
dk-vk- 1214.—vkS|ksfxd fookn vf/fu;e] 1947 (1947 dk 14) dh èkkjk 17 ds vuqlj.k esa dsUnzh; ljdkj ;wfu;u cSad
vkWiQ bafM;k ds çcaèkra=k ds lac¼ fu;kstdksa vkSj muds deZdkjksa ds chp] vuqcaèk esa fu£n"V vkS|ksfxd fookn esa dsUnzh; ljdkj vkS|ksfxd
vfèkdj.k@Je U;k;ky;] dkuiqj (m-iz-) ds iapkV (lanHkZ la[;k 43@2011) dks çdkf'kr djrh gS] tks dsUnzh; ljdkj dks 06-08-2018
dks çkIr gqvk FkkA
¹la- ,y&12011@3@2011&vkbZvkj (ch&II)º
jfo dqekj] vuqHkkx vf/dkjh
New Delhi, the 6th August, 2018
S.O. 1214.—In pursuance of Section 17 of the Industrial Disputes Act, 1947 (14 of 1947), the Central
Government hereby publishes the Award (Ref. No. 43/2011) of the Central Government Industrial Tribunal-cum-Labour
Court, Kanpur (U.P.) as shown in the Annexure, in the industrial dispute between the management of Union Bank of
India and their workmen, received by the Central Government on 06.08.2018.
[No. L-12011/3/2011-IR (B-II)]
RAVI KUMAR, Section Officer
ANNEXURE
BEFORE SRI SHUBHENDRA KUMAR, HJS, PRESIDING OFFICER, CENTRAL GOVERNMENT
INDUSTRIAL TRIBUNAL-CUM-LABOR COURT, KANPUR
Industrial Dispute No. 43 of 2011
Between :
The General Secretary,
Union Bank Employees Union UP,
5126
THE GAZETTE OF INDIA : AUGUST 11, 2018/SRAVANA 20, 1940
[PART II—SEC. 3(ii)]
C/o 628/M-33, Murari Nagar,
Faizabad Road,
Lucknow.
AND
The General Manager (Field)
Union Bank of India, Sharda Towe Kapurthala Complex
Aliganj,
Lucknow (UP).
AWARD
1.
Central Government, MOL, vide notification no. L-12011/3/2011-IR (B-II) dated 06.06.2011 has referred the
following Industrial Dispute to this Tribunal for adjudication.
2.
“Whether the action of the management of Union Bank of India, Lucknow in imposing penalty of stoppage of
annual increment of Shri Iftikhar Ahmad Head Cashier working at Bahaadurganj Branch in Ghazipur Region is
just , fair and legal ? What relief of the workman is entitled to?’
3.
The workman while working as Head Cashier at Bahadurganj Branch of Union Bank of India in Ghazipur Region
paid Rs 70,000/- against the document of Rs 10,000/- to Sri Ashok Rai, an Account holder in the Bank on
23.07.2001. The workman while tallying the cash found the shortage of Rs. 60,000/- and reported the matter to
Branch Manager. The Branch Manager did not take action to get the money back from Sri Ashok Rai, and asked
the workman to arrange Rs. 60,000/- to enable him to close the tallied cash in the Bank’s safe. The workman
could not manage such huge amount of cash and so the shortage was adjusted by passing entry through Suspense
Account. The workman was required to deposit the shortage in monthly installment of Rs. 15, 00/-from his
monthly salary. Thus Bank was not at loss in any manner. The Bank, however, served first charge sheet without
considering the matter seriously. The Bank issued second charge sheet and conducted departmental enquiry on the
charges as mentioned in second charge sheet. The Enquiry Officer gave his finding and he as Disciplinary
Authority imposed the punishment of stoppage of next annual increment with cumulative effect upon the
workman. The workman being aggrieved submitted an appeal to Bank but it was not replied.
4.
It is further alleged that worker was promoted to clerical cadre while worker was working as head cashier at
Bahadurganj Branch on 23.07.2001 made the payment of 70,000/- against the documents of 10,000/-. At the
relevant time branch was having two cash counter to handle the rush of customer but worker was asked to handle
singly the entire job of cash receipt and cash payment. Worker reported the matter with Branch Manager with the
name of customer to whom the wrong payment was made and instead of taking any action in the matter workman
was made to adjust the shortage of cash in installment of Rs 15, 00/- from his monthly salary. The past service
condition of workman remained satisfactory and enquiry officer-cum-disciplinary authority without considering
this aspect treated the workman guilty of gross misconduct as well as minor misconduct. The punishment awarded
to the worker is highly disproportionate considering the gravity of the proved misconduct therefore the
punishment is liable to be quashed.
5.
Lastly it has been prayed that the punishment order passed by disciplinary authority be quashed.
6.
Management has filed written statement stating that considering the shortage of cash amount of 60,000/- a
memorandum dated 22.03.2002 was issued to the worker proposing to impose punishment according to provisions
to Bipartite settlement but the worker did not submit any reply to the memorandum despite getting opportunity.
Worker was again issued a memo dated 23.05.2002 asking him to submit his reply failing which disciplinary
action would be initiated against him. As such management decided to hold a regular inquiry against worker and
he was issued charge sheet dated 18.09.2002 and Sri S N Mehra was appointed as Enquiry officer/disciplinary
authority to hold enquiry. Enquiry Officer fix date of hearing and worker was intimated by the letter dated
15.11.2002. During the enquiry worker submitted before the enquiry officer that nobody is ready to defend him in
the present enquiry. During the enquiry worker admitted his misconduct. Admission of guilt by the worker was
made without any duress pressure, coercion or any promise during the course of the enquiry. Considering the
version of worker made by him in the enquiry punishment of stoppage of next annual increment with cumulative
effect was proposed and before passing final order worker was granted personal hearing by the disciplinary
authority vide letter dated 19.02.2003. During the course of personal hearing worker again admitted his guilt
before the disciplinary authority with prayer for taking lenient view in the matter on the ground that Rs 15, 00/-
month is being deducted from his salary against excess payment made by him. Ultimately disciplinary authority
pass final order on 28.02.2003 against which no appeal was made by the worker.
7.
Lastly management has prayed the claim of the union is liable to be rejected being devoid of merit.
8.
Union has also filed rejoinder but nothing new has been pleaded therein.
¹Hkkx IIµ[k.M 3(ii)º
Hkkjr dk jkti=k % vxLr 11] [email protected] 20] 1940
5127
9.
Bank has filed photocopy of charge sheet dated 18.09.2002, photo copy of enquiry proceedings dated 9.1.2003,
photocopy of letter dated 9.1.2003, photocopy of findings of enquiry officer dated 15.01.2003, photocopy of
proceedings of personal hearings dated 27.02.2003 and photocopy of final order dated 28.02.2003.
10.
Union has examined the worker Sri Iftakar Ahmad as WW1 in support of its case.
11.
Representative for the management on 7.06.18 made an endorsement on the order sheet that management does not
want to adduce any evidence in the present case.
12.
I have heard the representative of both sides at length and perused the record of the case carefully.
13.
Authorized representatives for both the parties have admitted that it is a case of departmental inquiry in which
management has imposed penalty of stoppage of annual increment o n Sri Iftikhar Amhad, Head Cashier of the
Branch. They also agreed that the powers conferred upon the tribunal under section 11-A of the Industrial
Disputes Act cannot be exercised in this case as it is not a case of termination, removal or discharge of the worker
from the service of the bank.
14.
On perusal of record it appears that charge sheet was given to the worker for the misconduct that on 23.07.01
worker made cash payment of Rs.70, 000/- instead of Rs.10,000/- to Sri Ashok Kumar Rai as per with drawl form
which resulted into excess payment of Rs.60000/- and the shortage of cash was adjusted by debiting suspense
account and worker has also admitted his negligence. During the inquiry the worker has also moved an application
before the Enquiry Officer/Disciplinary Authority on 09.01.03 admitting his guilt and stating that due to excess
work he made excess payment of Rs.60000/- to Sri A K Rai and also stating that he is admitting the charges
voluntarily without any pressure and unconditionally and requested to take lenient view regarding the punishment
as he has a large family and he has no other source of income except this service and salary.
15.
Thereafter Sri S N Mehra, EO/DA, in his report dated 15.01.03 has found the worker guilty in view of the
admission of charges and proposed stoppage of next increment with cumulative effect and an fixed 27.02.03 for
personal hearing of Sri Ahmad. During the course of personal hearing the worker admitted that he has already
confessed the allegation voluntary and requested to take lenient view in the matter. After this Sri S N Mehra,
disciplinary authority passed final order dated 28.02.03 confirming the proposed punishment of stoppage of one
annual increment with cumulative effect for proved gross misconduct and warning for proved minor misconduct.
16.
Worker has examined himself before the tribunal and in his cross examination he has deposed that this case was
filed by General Secretary of the Union but he has not given any evidence in this case He has admitted his
signature on paper no.11/3 memorandum issued by the disciplinary authority on 23.05.02 and has also put his
signature on paper no.11/4-6 proceedings of the inquiry and on paper no.11/7 which is a letter given by him
confessing the guilt voluntarily and also admitted his signature on the personal hearing granted by the disciplinary
authority paper no.11/11-12 and has further admitted his in his cross examination that it is correct that he has
admitted his guilt through paper no.11/7 and further deposed that in para 8 of the claim petition he has admitted
the charges and he was afforded full opportunity of his defense during the domestic inquiry. He further admitted
that he has not filed any appeal against the final order passed by the disciplinary authority on 28.02.03.
17.
From the above discussion it is evident that worker was given full opportunity of his defense by the inquiry officer
during inquiry and further he has tendered unconditional and voluntarily confessed the charge and in his letter
confessing the charges and during the personal hearing worker has requested to take lenient view and the
management considering the gravity of charge has already taken a lenient view by imposing penalty of stoppage
of one increment with cumulative effect. It is also clear that there is no legal flaw in the proceedings of inquiry
and it was done according to rules of natural justice fairly and moreover the worker has not filed any appeal
against the order of punishment.
18.
Hence considering the overall aspect of the matter the tribunal is of the view that the disciplinary authority has
already taken a lenient view while imposing the punishment upon the worker and the action of the management in
imposing the punishment upon the worker is just fair and legal and does not require any interference.
19.
Reference is therefore, decided against the union and in favor of the management.
SHUBHENDRA KUMAR, Presiding Officer
ubZ fnYyh] 6 vxLr] 2018
dk-vk- 1215.—vkS|ksfxd fookn vf/fu;e] 1947 (1947 dk 14) dh èkkjk 17 ds vuqlj.k esa dsUnzh; ljdkj lSUVªy cSad
vkWiQ bafM;k ds çcaèkra=k ds lac¼ fu;kstdksa vkSj muds deZdkjksa ds chp] vuqcaèk esa fu£n"V vkS|ksfxd fookn esa dsUnzh; ljdkj vkS|ksfxd
5128
THE GAZETTE OF INDIA : AUGUST 11, 2018/SRAVANA 20, 1940
[PART II—SEC. 3(ii)]
vfèkdj.k@Je U;k;ky;] dkuiqj (m-iz-) ds iapkV (lanHkZ la[;k 112@13) dks çdkf'kr djrh gS] tks dsUnzh; ljdkj dks 06-08-2018 dks
çkIr gqvk FkkA
¹la- ,y&12011@56@2013&vkbZvkj (ch&II)º
jfo dqekj] vuqHkkx vf/dkjh
New Delhi, the 6th August, 2018
S.O. 1215.—In pursuance of Section 17 of the Industrial Disputes Act, 1947 (14 of 1947), the Central
Government hereby publishes the Award (Ref. No. 112/13) of the Central Government Industrial Tribunal-cum-Labour
Court, Kanpur (U.P.) as shown in the Annexure, in the industrial dispute between the management of Central Bank of
India and their workmen, received by the Central Government on 06.08.2018.
[No. L-12011/56/2013-IR (B-II)]
RAVI KUMAR, Section Officer
ANNEXURE
BEFORE SRI SHUBHENDRA KUMAR, HJS, PRESIDING OFFICER, CENTRAL GOVERNMENT
INDUSTRIAL TRIBUNAL-CUM-LABOR COURT, KANPUR
Industrial Dispute No. 112/13
Between :
The State Executive Committee Member,
U.P. Bank Workers Organization, 3/13,
Mathura Nagar, Aligarh.
ALIGARH (U.P.)
AND
1.
The Regional Manager,
Central Bank of India, Regional Office,
37/2/4, 2nd Fooor, Sanjay Place, Agra,
AGRA (U.P.)-282002.
2.
The Branch Manager,
Central Bank of India, Jattari,
Distt-Aligarh (U.P.)
ALIGARH(U.P)
AWARD
1.
Central Government, MOL, vide notification no. L-12011/56/2013-IR (B-II) dated 08.08.2013 has referred the
following Industrial Dispute to this Tribunal for adjudication.
2.
“Whether the action of the management of Central Bank of India in taking work from Shri Papoo Lal Verma,
S.W.O beyond working hours and not making payment of overtime to him for the period from November, 2010 to
February, 2012 us just, fair and legal? What relief the workman concerned entitled to?”
3.
The case set up by the union on behalf of the worker in short is that in the bank there is provision for making
payment of over time in case any worker works beyond the duty hours and the branch manager of the branch
where the worker was posted under his oral instructions took the work of over time beyond the normal working /
business hours from the worker and the working of the worker was being supervised and controlled by the branch
manager and it was the obligation of the branch manager to ensure payment of overtime to the worker for work
done by him beyond the normal business hours in the branch. Accordingly the union has prayed that the worker be
allowed payment of over time doe by him in the branch.
4.
Management has filed written statement denying the entire claim of the union stating that the claim of union is not
tenable in the eye of law on the ground that no work had been taken from the worker beyond the normal banking
hours. The branch manager Jattari Branch has made it clear as to under what circumstances over time is payable
but this fact has deliberately been suppressed by the union in his claim petition. Neither any direction was issued
by the bank nor was any certificate annexed by the union along with the claim which was issued as per bank’s
norms to the worker regarding overtime. The claim of the worker is based on whimsical grounds and therefore, is
liable to be rejected.
5.
Union has filed rejoinder but nothing new has been stated therein.
¹Hkkx IIµ[k.M 3(ii)º
Hkkjr dk jkti=k % vxLr 11] [email protected] 20] 1940
5129
Worker has filed copy of application given to the management for payment of Overtime dated 4.09.12 , 6/4, and
replies of management dated 07.09.2012, 6/4, stating that he has worked for over time on his own will without
any office order, 6/5, and copies of attendance sheet, 6/6-34 and calculation chart of over time, 6/35-45.
6.
Management has filed copy of instructions issued by the management for payment of over time through list dated
23.10.15.
Worker has examined himself as w.w.1 and in his cross examination he stated that Regional Manager had not
issued any office order in writing for his overtime duty and he has done over time duty on the oral instructions of
the branch manager during the period November 2010 to 2012.
7.
His cross examination was deferred for next date, but he did not turn up, therefore, his cross examination was
made nil.
Management has not adduced any oral evidence.
8.
I have heard the authorized representative for the management. None appeared on behalf of worker to submit
arguments.
9.
I have also perused the record.
10.
From the own admission of worker in his cross examination it is clear that he was not given any written direction
or office order by branch manager for performing over time and it appears that he has done over time on his own
will. Secondly he absented himself from his further cross examination and ultimately it was made nil. On this
score also his evidence cannot be read against the management.
11.
As such union has failed to prove the claim raised on behalf of the worker and worker is not entitled for any relief.
Award is made accordingly against the Union/worker and in favor of management.
SHUBHENDRA KUMAR, Presiding Officer
ubZ fnYyh] 6 vxLr] 2018
dk-vk- 1216.—vkS|ksfxd fookn vf/fu;e] 1947 (1947 dk 14) dh èkkjk 17 ds vuqlj.k esa dsUnzh; ljdkj ;wdks cSad ds
çcaèkra=k ds lac¼ fu;kstdksa vkSj muds deZdkjksa ds chp] vuqcaèk esa fu£n"V vkS|ksfxd fookn esa dsUnzh; ljdkj vkS|ksfxd vfèkdj.k@Je
U;k;ky;] dkuiqj (m-iz-) ds iapkV (lanHkZ la[;k 32@12) dks çdkf'kr djrh gS] tks dsUnzh; ljdkj dks 06-08-2018 dks çkIr gqvk FkkA
¹la- ,y&12012@100@2011&vkbZvkj (ch&II)º
jfo dqekj] vuqHkkx vf/dkjh
New Delhi, the 6th August, 2018
S.O. 1216.—In pursuance of Section 17 of the Industrial Disputes Act, 1947 (14 of 1947), the Central
Government hereby publishes the Award (Ref. No. 32/12) of the Central Government Industrial Tribunal-cum-Labour
Court, Kanpur (U.P.) as shown in the Annexure, in the industrial dispute between the management of UCO Bank and
their workmen, received by the Central Government on 06.08.2018.
[No. L-12012/100/2011-IR (B-II)]
RAVI KUMAR, Section Officer
ANNEXURE
BEFORE SRI SHUBHENDRA KUMAR, HJS, PRESIDING OFFICER, CENTRAL GOVERNMENT
INDUSTRIAL TRIBUNAL-CUM-LABOR COURT, KANPUR
Industrial Dispute No. 32/12
Between :
Shri R.K. Sood,
39, Basant Vihar, Kamal Nagar,
AGRA (U.P.)
AND
The Dy. General Manager,
UCO Bank, R.O. Skylark Building,
28 Naval Kishore Marg,
Lucknow (U.P)
5130
THE GAZETTE OF INDIA : AUGUST 11, 2018/SRAVANA 20, 1940
[PART II—SEC. 3(ii)]
AWARD
1.
Central Government, MOL, vide notification no. L-12012/100/2011-IR (B-II) dated 12/19.04.2012 has referred
the following Industrial Dispute in this Tribunal for adjudication.
2.
‘Whether the action of the management of UCO Bank, Lucknow in imposing the punishment dismissed from the
bank services w.e.f. 02/01/2009 ‘ vide order dated 02.01.2009 upon Shri R.K.Sood, Special Assistant, posted at
Belanganj, Agra is legal and just? To what relief the concerned workman is entitled to?’
3.
The case of worker in short is that the worker while working as special assistant at Branch office Belanganj, Agra
was suddenly placed under suspension vide order dated 14.05.2007 stating that some serious irregularities have
been committed by him ignoring the fact that entire service career his work and conduct remained ever
satisfactory, and no reasons were disclosed in the order of suspension. It is further alleged that the Branch
Manager Sri Sukhbinder Singh on 11.07.2007 lodged an FIR against the workman under section 406 and 420 of
IPC at PS, Chatta, district Agra alleging there in that in totality there had been irregularities in 25 accounts of the
account holders. Opposite party issued a charge sheet dated 09.04.2008 belatedly on 9.04.2008 where in allegation
of forged transaction were leveled in only 5 accounts and these accounts are different than 21 accounts mentioned
in the charge sheet. Worker specifically denied the allegation leveled against him vide his letter dated 30.04.2008
which were not found satisfactorily and the management the same day appointed enquiry officer and presenting
officer. Presenting Officer was under the supervision and control of the disciplinary authority. It is further alleged
that the enquiry officer conducted the enquiry in gross breach of rules of natural justice in as much as copies of
documents relied upon in support of charges were neither provided to the worker nor the worker was provided
adequate opportunity to cross examine the witness of the management despite repeated request made by worker in
this behalf and also management without providing opportunity; to the worker to adduce his evidence in defense
concluded the enquiry ex parte in which out of 5 charges only four charges were found proved against the worker.
As regards the report of enquiry officer is concerned it has been alleged that the findings rendered by enquiry
officer in his report is based on conjectures and surmises without proper appreciation of evidence available on the
record of domestic enquiry. Worker made specific request the report of enquiry officer be quashed by disciplinary
authority and de-novo enquiry be ordered in the matter so that worker be able to present his defense but without
considering the request of the worker in a prejudicial manner the disciplinary authority by order dated 2.01.2009
dismissed the workman from the service of the Bank which is unfair and unconstitutional which in itself is not
clear still. The punishment order was implemented against the worker which is glaring example of unfair labour
practice. Thus the dismissal order dated 2.01.2009 passed by the disciplinary authority is wholly unfair,
unconstitutional and against the social/ natural justice as such liable to be quashed. Appeal preferred by worker
against his dismissal order too was not found favour at the hands of the appellate authority who vide his order
dated 5.03.2009 confirmed the punishment order without application of mind.
4.
It is also pleaded by the worker that none of the customer of account holders mentioned in charge sheet were
called upon by the enquiry officer in witness box as such entire enquiry was concluded on whimsical grounds by
the enquiry officer. He was also not paid sustenance allowance as per rule and request made by worker in this
behalf was rejected which prejudicial to the interest of the worker.
5.
It is also alleged by the worker that due to illegal action on the part of management the worker has become jobless
and despite his best effort he could not search appropriate job for his livelihood and as such worker is not in
position to discharge his family obligation for which the management is responsible.
6.
On the basis of above pleading the worker has prayed that the punishment order dated 2.01.2009 be quashed and
he be reinstated in the service with full back wages, continuity of service and with all consequential benefits
attached with the post.
7.
Management has filed written statement alleging that worker R K Sood has committed certain irregularities/fraud
while working as special assistant at Belanganj Branch of UCO Bank, Agra. A FIR to this effect was lodged on
11.07.2007. As a matter of fact charges leveled against worker were grave in nature and he remained in police
custody for some period. Worker was suspended vide order dated 14.05.2007. He was issued charge sheet dated
9.04.2008 for committing serious misconduct, irregularities and fraud against the bank. Worker in an unauthorized
manner debited various amounts to the accounts of different parties and used the amount to his own benefit and
had made several transactions with ulterior motive and with the intention to the fraud the bank for his personal
gains. He also failed to perform his duty with honesty and committed acts prejudicial to bank interest involving
the bank in serious loss and the act of worker is an act of misconduct under clause 5(j) of memorandum of
settlement on disciplinary action procedure for workmen staff dated 10.04.2002.
8.
Sri R K Sood was required to submit his written explanation and he submitted his written reply dated 30.04.2008
where in no specific explanation to the allegation was given by the worker except denying the charges which was
not found satisfactory and it was decided by the bank to hold departmental enquiry against the worker. Enquiry
officer and presenting officer was appointed by the disciplinary authority vide notification dated 30.04.2008.
¹Hkkx IIµ[k.M 3(ii)º
Hkkjr dk jkti=k % vxLr 11] [email protected] 20] 1940
5131
Enquiry officer has conducted the domestic enquiry on various dates strictly with the accordance of the rules of
natural justice. The enquiry was commenced from 26.05.2008 and concluded on 4.08.2008. Worker attended the
enquiry with his defense representative only during management presentation up to 12.08.2008 where after R K
Sood and his defense representative did not attend the enquiry proceedings in order to defend his case taking plea
that the FIR lodged against worker is related to above charge sheet. During enquiry worker produced medical
certificates for different ailment just to delay the enquiry proceedings. He also requested that enquiry proceedings
may be postponed up to decision of the court in respect of FIR filed by bank where writ petition is filed by R K
Sood. The request of the worker to postpone enquiry proceedings was overruled on the ground that the allegation
of charges are different than that of allegation leveled in FIR. In the above circumstances enquiry proceedings
have been concluded ex parte by giving full opportunity to the worker of his defense. The worker by letter dated
13.09.2008 instead of submitting written brief in his defense has again requested for producing his defense after
the decision of Hon’ble High Court, Allahabad which was disallowed as subject matter pending before Hon’ble
High Court was different from the charge sheet. Inquiry Officer after concluding his enquiry submitted his report
dated 23.09.2008 along with complete enquiry proceeding relating to the worker before the discipline authority.
Worker was supplied a copy of enquiry report inviting his comments but instead of offering his comments he
desired to reopen the enquiry from the stage he could not attend the enquiry on the ground of his illness. His
request was made by him through his letter dated 13.10.2008. Worker was given last opportunity to submit his
comments vide letter dated 16.10.2008 but worker has not submitted any comments.
9.
The enquiry officer found charges leveled against Sri R K Sood fully established in the domestic enquiry. Worker
was given full, fair and reasonable opportunity to defend his case in the enquiry by cross examining the witnesses
and to examine his own witness and documents in the enquiry. The disciplinary authority issued tentative order
proposing infliction of punishment upon the worker. He was given an opportunity of personal hearing regarding
findings of enquiry officer and proposed final order. Disciplinary authority considering the request of the worker
once again perused the entire records of enquiry and found that the report of enquiry officer was based on
evidence on record of the enquiry. It is also pleaded that free, fair and regular enquiry was held against worker.
10.
It is also pleaded that the action of management against the worker was fully legal fair and justified and was in the
interest of the Bank.
11.
Worker has filed rejoinder but nothing new has been pleaded there in except reiterating the pleadings of the claim
petition.
12.
Management per list dated 30.09.2013 has filed complete record of enquiry running into 14 documents mentioned
in the list. In the instant case preliminary issue regarding legality and fairness of the enquiry was framed on
19.06.18 by this Tribunal but AR for the worker moved an application admitting that domestic enquiry held by the
management is legal and fair. Accordingly it is held that the enquiry against the worker is fair and legal and
suffers from no infirmities.
13.
I have heard the arguments of both the parties and perused the record of the case.
14.
Before recording the findings by this Tribunal it is essential to refer the allegation of charges leveled against the
worker vide charge sheet dated 9.04.2008 which are as under:-
a)
On 06.11.03 a sum of Rs. 11038/-was debited in an unauthorized manner to SB A/C No. 9252 of
Sri Narendra Kumar Maheshwari by way of Cheque No. 063764 (entered in the system as a withdrawal
form) and credited SB A/C No. 4955 in your name jointly with Madhu Sood. Cheque No 063764 used in
the transaction was issued in your SB A/C No. 2720 (Joint A/C). Signature of Sri Narendra Kumar
Maheshwari on Cheque was fake and the Cheque was passed by you fraudulently.
b)
On 25.11.03, a sum of Rs. 3000/- was debited in an un-authorized manner to SB A/C No. 9252 of
Sri Narendra Kumar Maheshwari by way of a withdrawal form pertaining to your Account No. SB 3104.
This withdrawal form was passed by you and the payment was also received by you. There was no balance
in your SB A/C 3104 at that time.
c)
On 17.06.04, a sum of Rs. 20000/- was debited in an un-authorized manner to SB A/C No. 6771 of
Sri Prabhat Kumar Maheshwari by way of a withdrawal form and amount was paid in cash. The
withdrawal form was bearing fake signature of account holder which was passed by you.
d)
On 04.10.04, you debited a sum of Rs. 21,000/- in an un-authorized manner to SB A/C No. 9252 of
Sri Narendra Kumar Maheshwari. You made vouchers and passed the same. Transactions also made and
passed by you in the system. Although Credit voucher was made in the name of Seema Maheshwari but it
was credited by you in your joint Account No. SB 3104.
e)
On 27.05.2006, a sum of Rs. 25,000/- was debited in an un-authorized manner to SB A/C No. 9587 of
Sri Bishan Swarup Bansal by way of a withdrawal form bearing fake signature of the drawer. This was
passed as well as authorized in the system by you.
5132
THE GAZETTE OF INDIA : AUGUST 11, 2018/SRAVANA 20, 1940
[PART II—SEC. 3(ii)]
15.
Now it is to be seen on the basis of re-appreciation of evidence collected by the enquiry officer during the course
of domestic inquiry and re-appreciation of findings recorded by the enquiry officer under powers conferred upon
the tribunal under section 11-A of Industrial Disputes Act, 1947, as to whether the charges have been proved
against the worker or not as also whether the punishment awarded to the worker is shockingly disproportionate to
the charges proved before this Tribunal and it requires interference of the tribunal or not.
16.
On perusal of enquiry proceedings, evidence collected by the enquiry officer in the inquiry and findings of the
enquiry officer by means of which he found 4 charges proved and charge no.5 as not proved and on the basis of
his report punishment awarded to the worker commensurate with the allegations of charges.
17.
During the course of domestic inquiry, it appears that the worker has been given charge sheet on 5 counts and
after domestic inquiry worker has not been found guilty for charge no.5 by the enquiry officer as well as by the
disciplinary authority and he has been found guilty for remaining 4 charges and after issuing show cause notice
disciplinary authority inflicted punishment of dismissal without notice upon the worker, but surprisingly as also
admitted by the authorized representative for the management, the management the money alleged to be received
by the worker by fraud was not recovered from the worker not the disciplinary authority passed ay order for
recovery of the alleged amount.
18.
During domestic inquiry management examined two witnesses by name Sri M P Jain Assistant Manager, and
Sri Mukesh Chandra Srivastava.
19.
Sri Mukesh Chandra Srivastava during his cross examination before the inquiry officer has clearly admitted that
he had no personal knowledge as to whether any irregularity was found in the account of those account holders
whose money is said to have been transferred by the worker in his account.
20.
M.W. 1 Sri M P Jain, has also admitted that cheque no. 0637612780, was issued in favor of worker by Sri R.K
Sood. It is also deposed by the witness that the cheque and withdrawal form were passed by the worker. He also
deposed that signatures of the account holders did not tally with the signature made on cheque or withdrawal
forms but enquiry officer has neither summoned the account holders during inquiry to verify their signatures nor
the enquiry officer has made any efforts to call report from the hand writing expert. He has also deposed in clear
terms that he cannot say as to which officer has confirmed the debit voucher. It also shows that some of the
officers have confirmed the debit vouchers payment but this witness has deliberately not exposed their names
during the domestic inquiry. The witness was put to a specific question whether any of the 5 account holders have
made any oral or written complaint with the bank authorities and the witness has shown is ignorance then again he
has admitted that that he knows Sri P K Maheshwari and V. S. Bansal, but he has not discussed about the undue
irregularity in their accounts.
21.
Sri Jain in his evidence has also admitted that the worker R K Sood was the introducers of Sri P K Maheshwari in
his saving bank account no. 6771.
22.
Thus it is evident that the worker was knowing Sri Maheshwari and he has introduced him in opening of the
account as account holder, but as Sri Maheshwari has never made any oral or written complaint to the bank nor
the authorities have ever discussed with them about any irregularity made in their account and also Sri M K
Srivastava M.W.2, stated that no irregularity in the account of account holder was in his knowledge, therefore,
issuance of charge sheet to the worker appears to be not legal and valid in the absence of oral or written complaint
in this regard by the account holder.
23.
Therefore, from the above appreciation of evidence it is abundantly clear that the worker knew Sri Maheshwari
and he has introduced him in the process of opening the account no. 6771. Account holder had never made any
oral or written complaint to the bank authorities nor the authorities of the bank have ever discussed with them
about any irregularity made in their account and also Sri M K Srivastava, M.W.2 stated that no irregularity in the
account of the account holder was in his knowledge.
24.
Besides this the bank authorities have not taken any steps for recovery of the amount alleged to have been
misappropriated by the worker by transferring the amount in his account.
25.
Therefore, from the above conduct of the responsible authorities of the bank shows that they have initiated the
disciplinary proceedings against the worker on the basis of conjecture and surmises without any complaint from
the account holder suo-moto and punished the worker for dismissal without notice without recording the statement
of any of the account holders during the course of domestic inquiry. Therefore, the entire exercise in the name of
disciplinary action against the worker Sri R K Sood appears to be wholly illegal and without any basis.
26.
Therefore, from the overall appreciation of evidence available on the record of domestic inquiry, the tribunal is of
the firm opinion that none of the charges are found proved against the worker, but their appears serious negligence
on the part of the worker that he has directly received and passed the cheques and withdrawal forms as cheques
and withdrawal forms as per banking practice are supposed to have been received by the cashier and it was the
¹Hkkx IIµ[k.M 3(ii)º
Hkkjr dk jkti=k % vxLr 11] [email protected] 20] 1940
5133
duty of the cashier to send these instruments to the worker for passing the same and after passing it they should
have been returned to the cashier for debiting and crediting of the amount.
27.
In view of above discussion and reappraisal of the evidence available in domestic inquiry file, the tribunal is of the
considered view that the worker is found guilty of negligent in discharge of his official obligation as he has over
passed the cashier and dealt with the instruments directly and it is the only misconduct which is found proved
against the worker.
28.
Now after reappraisal of evidence question arises before the tribunal as to whether the punishment of dismissal
without notice awarded to the worker commensurate with the proved charge before the tribunal or not and it
requires interference at the hands of the tribunal or not.
29.
The tribunal after giving its anxious considerations to the evidence and circumstances of the case appeared in the
domestic inquiry is of the opinion that the punishment awarded to the worker by the disciplinary authority is
shockingly disproportionate as no man having ordinary prudent mind would come to the conclusion as arrived by
the enquiry officer and disciplinary authority especially in the circumstances when charges have been found as not
proved by the tribunal.
30.
It is admitted to both the parties that the worker has already crossed the age superannuation, therefore, the
punishment of dismissal from the service of the bank without notice awarded to the worker is set aside and in
place of it the tribunal award punishment of compulsorily retirement of the worker with superannuation benefits,
like pension, gratuity, leave encashment and provident fund etc., as are payable to him under rules, in exercise of
its powers under section 11-A of Industrial Disputes Act, 1947, from the date of passing of the punishment of
dismissal from service without notice by the disciplinary authority, to meet the ends of justice. Worker will not be
entitled for any back wages.
SHUBHENDRA KUMAR, Presiding Officer
ubZ fnYyh] 6 vxLr] 2018
dk-vk- 1217.—vkS|ksfxd fookn vf/fu;e] 1947 (1947 dk 14) dh èkkjk 17 ds vuqlj.k esa dsUnzh; ljdkj lSUVªy cSad
vkWiQ bafM;k ds çcaèkra=k ds lac¼ fu;kstdksa vkSj muds deZdkjksa ds chp] vuqcaèk esa fu£n"V vkS|ksfxd fookn esa dsUnzh; ljdkj vkS|ksfxd
vfèkdj.k@Je U;k;ky;] gSnjkckn ds iapkV (lanHkZ la[;k 78@2006) dks çdkf'kr djrh gS] tks dsUnzh; ljdkj dks 06-08-2018 dks çkIr
gqvk FkkA
¹la- ,y&39025@01@2017&vkbZvkj (ch&II)º
jfo dqekj] vuqHkkx vf/dkjh
New Delhi, the 6th August, 2018
S.O. 1217.—In pursuance of Section 17 of the Industrial Disputes Act, 1947 (14 of 1947), the Central
Government hereby publishes the Award (Ref. No. 78/2006) of the Central Government Industrial Tribunal-cum-Labour
Court, Hyderabad as shown in the Annexure, in the industrial dispute between the management of Central Bank of India
and their workmen, received by the Central Government on 06.08.2018.
[No. L-39025/01/2017-IR (B-II)]
RAVI KUMAR, Section Officer
ANNEXURE
BEFORE THE CENTRAL GOVERNMENT INDUSTRIAL TRIBUNAL-CUM-LABOUR COURT AT
HYDERABAD
Present : Sri Muralidhar Pradhan, Presiding Officer
Dated : the 29th day of June, 2018
INDUSTRIAL DISPUTE L.C. No. 78/2006
Between :
Sri M. Raju,
S/o M. Yadagiri,
2-3-647/B/2/6, Premnagar,
Amberpet, Hyderabad
…Petitioner
5134
THE GAZETTE OF INDIA : AUGUST 11, 2018/SRAVANA 20, 1940
[PART II—SEC. 3(ii)]
AND
1.
The Zonal Manager,
Central Bank of India,
Kothi, Bank Street,
Hyderabad
2.
The Chief Officer,
Personnel,
Central Bank of India,
Kothi, Bank Street,
Hyderabad
…Respondents
Appearances:
For the Petitioner
:
M/s. N. Vinesh Raj & T.V. Ravinder Kumar, Advocates
For the Respondent
:
M/s. Ch. Siva Reddy & T.G. Prasad Reddy , Advocates
AWARD
Sri M. Raju who worked as Car Driver (who will be referred to as workman) has filed this petition under Sec.
2A(2) of the Industrial Disputes Act, 1947 against the Respondents seeking for reinstatement, consequently directing the
Respondents to grant all the consequential benefits such as continuity of service, back wages and all other attendant
benefits etc., and such other reliefs as this court may deems fit.
2.
The averments made in the petition in brief are as follows :
The Petitioner workman was appointed as a Car Driver from 1.10.1994 and entrusted to work with the Assistant
General Manager of the Respondents’ bank. His last drawn salary was Rs.3,775/-. He worked under several Assistant
General Managers. The workman’s salary used to get credited into his Bank account. He was issued with uniforms as
well as service certificate. The Petitioner workman used to maintain Log Book which shows that he used to drive the
vehicle of the Respondents’ Bank, but as and when required, the Petitioner used to serve under officers of the
Respondents’ bank. It is submitted that the Respondents are treating the services of the Petitioner workman as personal
driver which is not true and the initials of the officers can clearly be seen in the log book. The Petitioner served under
Smt. Soujanyavathi and Sri Rama Rao, Scale-II officers to Amanpadi, Tlq, Ibrahimpatnam for official work for
inspection of a rice Mill and also returned and continued to work, suddenly the services of the Petitioner were terminated
from 1.3.2006. During his tenure i.e., from 1.10.1994 to 28.2.2006 the Petitioner represented several times for
regularization of his services, but instead of regularization he was orally terminated from service without following the
provisions of the Labour Laws and Sec.25(F) of the Industrial Disputes Act, 1947. Other casual employees who were
subsequently regularized, juniors to the workman are still continuing in service. It is further stated that after termination
of his services, the workman issued a demand notice to the Respondents which was acknowledged by them but it was in
vain. The Petitioner couldn’t get any alternate employment till date inspite of all his efforts. Hence, the Petitioner has
prayed to direct the Respondents to reinstate him into service with full back wages, continuity of service and all other
attendant benefits.
3.
The Respondents filed counter with the averments in brief which runs as follows:
The averments of the Petitioner workman are totally denied. It is stated that the Respondents’ bank is a public
sector bank having several branches in the country and one such branch is at bank Street, Koti, Hyderabad which is
known as Corporate Finance branch and it is headed by the Asst. General Manager. As per rules, the executives and
some of the officers in the senior management are provided with car facility for the purpose of office use. The said
officers/executives shall drive the cars or have their own personal drivers to drive the said cars and the amount paid to
the drivers reimbursed to the said executives by way of a perquisite. Accordingly, the Petitioner workman was engaged
by the then Asst. General Manager as his personal driver on payment of salary of Rs.3,775/- pm and it is paid by the
Asst. General Manager which was reimbursed by the bank to the said Asst. General Manager by way of perquisite. No
recruitment rules are followed while engaging these personal drivers as they are not employed by the bank. The
Petitioner was also engaged by the then Asst. General Manager. The personal drivers of the executives were also
supplied with the uniform for the purpose of maintaining dress code and dignity of the office of the officer concerned.
The workman was issued with identity card for specific purposes, as he has to move with the concerned executive at
certain places where it requires proof of identity etc. and the identity card contains no employee number as well. It is
submitted that in the service certificates so issued in favour of the workman it was clearly mentioned that he was the
personal driver of the Asst. General Manager. He can not claim regularization with the support of the identity cards,
service certificates and uniform etc. as he was not appointed by the bank through recruitment process. Since he was not
employed or engaged by the Respondent bank, the question of his working more than 240 days in a year continuously
from 1994 is not relevant or legal. It is true that the Petitioner workman was engaged by the Asst. General Manager from
¹Hkkx IIµ[k.M 3(ii)º
Hkkjr dk jkti=k % vxLr 11] [email protected] 20] 1940
5135
1.10.1994 to 28.2.2006 as his personal driver and the salary was paid to the Petitioner by the said Asst. General Manager,
and during this period he might have made representations for regularization or for his absorption in the bank service.
There is no employer and employee relationship between the bank and the drivers, so engaged by the said executives for
whom they used to get the reimbursement by way of allowances. Since, the workman was never engaged by the
Respondents’ bank, the question of regularization/absorption in the bank service does not arise. The Government of
India has also clarified the position vide their circular F No.9/5/92-IR dated 23.6.1997, that personal driver engaged by
the executives of the bank can not be regularized as there is no employer and employee relationship between the bank
and the drivers so engaged by the executives. It is submitted that the Petitioner was engaged by the then Asst. General
Manager as his personal driver in his personal capacity and he has got every right to dispense with the service of the
Petitioner. Accordingly, the services of the Petitioner were dispensed with by the said Asst. General Manager with effect
from 1.3.2006 and it does not amount to retrenchment under the Industrial Disputes Act, 1947. As such, the termination
of the workman is not attracted by any of the provisions of the labour laws much less Section 25F of the Industrial
Disputes Act, 1947 and he is not entitled for reinstatement as claimed by him.
4.
In view of the pleadings of both the sides the following points are to be determined :
I.
Whether the action of the Respondents’ management in terminating the services of the Petitioner Sri M.
Raju is legal and justified?
II.
Whether the provisions of Sec.25F of the Industrial Disputes Act, 1947 are complied or not before
termination of the Petitioner?
III.
What other reliefs the Petitioner Sri M. Raju is entitled to?
5.
I have already heard the Learned Counsels for both the sides in this matter.
6.
The Petitioner examined himself as WW1 and marked some documents as Exs.W-1 to W-14. The Respondents
examined Sri B. Venkata Ramana, the Senior Manager on their behalf as MW1 and marked two documents on their
behalf as Ex.M1 and M2.
7.
The Learned Counsel appearing on behalf of the Petitioner contended that the Petitioner workman was appointed
as a car driver under the Respondents’ management from 1.10.1994 and entrusted to work with the Asst. General
Manager. He was getting salary regularly from the Respondents’ bank and his last drawn salary was Rs.3775/-. He
worked under several Asst. General Managers and his monthly salary was credited into his bank account. He was issued
with the uniform as well as service certificates from time to time. The Petitioner workman used to maintain log book
which shows that he used to drive vehicles of the Respondents’ bank but not for a particular officer, as and when
required. The Petitioner used to work under the officers of the Respondents’ bank. It is further contended that the
Respondents are treating the services of the Petitioner as a Personal Driver, which is not true because the initials of the
officers given in the log book can clearly show the status of the Petitioner workman. The Petitioner has served under
Smt. Soujanyavathi and Sri Rama Rao, Scale-II officers to Amanpadi, Tlq, Ibrahimpatnam for official work for
inspection of a rice Mill and also returned and continued to work. It is also contended that suddenly the services of the
Petitioner were terminated from 1.3.2006, but during his tenure i.e., from 1.10.1994 to 28.2.2006 the Petitioner made
several representations to the Respondent’s Bank on many occasions for regularization of his services, but instead of
regularization he was orally terminated from service without following the provisions of the Labour Laws and Sec.25(F)
of the Industrial Disputes Act, 1947. It is further contended that all other casual employees who were subsequently
regularized, are juniors to the workman and they are still continuing in service. It is also contended that after termination
of his services, the workman issued a demand notice to the Respondents which was acknowledged by them, but no action
was taken from the side of the Respondents. The Petitioner workman could not get any alternative employment till
date inspite of all his efforts till date. Under the above circumstances, the Learned Counsel for the Petitioner submitted
that a direction may be given to the Respondents to reinstate the Petitioner into service with full back wages, continuity
of service and all other attendant benefits.
8.
On the other hand the Learned Counsel appearing on behalf of the Respondents while denying the facts contended
by the Learned Counsel for the Petitioner argued that the Respondents’ bank is a public sector bank having several
branches in the country and one such branch is at bank Street, Koti, Hyderabad which is known as Corporate Finance
branch and it is headed by the Asst. General Manager. As per rules, the executives and some of the officers in the senior
management were provided with car facility for the purpose of office use. The officers/executives shall drive the cars or
have their own personal drivers to drive these cars and the amount paid to the drivers is reimbursed to the said
executives by way of perquisite. Accordingly, the Petitioner workman was engaged by the then Asst. General Manager
as his personal driver on payment of salary of Rs.3,775/- pm and it is paid by the Asst. General Manager himself which
was reimbursed by the bank to him by way of perquisite. No recruitment rules are followed while engaging these
personal drivers as they are not employed by the bank. The Petitioner was also engaged by the then Asst. General
Manager. It is also argued that the personal drivers of the executives were also supplied with uniform for the purpose of
maintaining dress code and dignity of the office of the officer concerned. But the workman was issued with identity
card for specific purposes, as he has to move with the concerned executive at certain places where it requires proof of
5136
THE GAZETTE OF INDIA : AUGUST 11, 2018/SRAVANA 20, 1940
[PART II—SEC. 3(ii)]
identity etc. and the identity card contains no employee number as well. It is further argued that in the service
certificates so issued in favour of the workman it had clearly mentioned that he was the personal driver of the
Asst. General Manager and he can not claim regularization with the support of such identity cards, service certificates
and uniform etc., as he was not appointed by the bank by recruitment process. Since the workman was not employed or
engaged by the Respondents’ bank, the question of his working more than 240 days in a year continuously from 1994 is
neither relevant nor illegal. He also argued that the Petitioner workman was engaged by the Asst. General Manager from
1.10.1994 to 28.2.2006 as his personal driver and the salary was paid to the Petitioner by the said Asst. General Manager,
and during this period he might have made representations for his regularization or for his absorption in the bank
service. There is no employer and employee relationship between the bank and the drivers, so engaged by the said
executives for whom they used to get reimbursement by way of allowances. Since, the workman was never engaged by
the Respondent bank, the question of regularization/absorption in the bank service does not arise. The Government of
India has also clarified the position vide their circular F.No.9/5/92-IR dated 23.6.1997, that personal driver engaged by
the executives of the bank can not be regularized as there is no employer and employee relationship between the bank
and the drivers so engaged by the executives. It is further argued that the Petitioner had been engaged by the then Asst.
General Manager as his personal driver in his personal capacity and he has got every right to dispense with the service of
the Petitioner. Accordingly, the services of the Petitioner were dispensed with by the said Asst. General Manager with
effect from 1.3.2006 and it does not amount to retrenchment under the Industrial Disputes Act, 1947. As such, the
termination of the workman is not attracted by any of the provisions of the labour laws much less under Section 25F of
the Industrial Disputes Act, 1947 and he is not entitled for reinstatement as claimed by him. With these submissions, the
Learned Counsel for the Respondent submitted for dismissal of the claim of the Petitioner and as such the workman is
not entitled to get for any relief as claimed in his claim petition and the claim petition is liable to be dismissed.
9.
On the contrary, the Learned Counsel for the Petitioner workman contended that the allegation of the Respondent
management is that the Petitioner was a personal driver of the Asst. General Manager but how from 1.10.1994 to
28.2.2006, the Petitioner was the only driver who worked under several Asst. General Managers. Whether the job of the
Asst. General Manager is transferable or not. If the Petitioner workman was working as a personal driver how he used
to work there from 1994 to 28.2.2006, why every Asst. General Manager opted to engage the Petitioner as their personal
driver. If the Petitioner workman is a personal driver, there is no necessity of issuance of any identity cards or uniform in
his favour. Why the Petitioner workman was issued with identity card and uniform. The Petitioner was given salary
under Ex.W2 to W11, through Bank Account. If personal driver why salary was paid as per his convenience to his bank
account. Further more, the service certificates issued by the officers of the bank vide Ex.W12 shows that the Petitioner
was working regularly under the Asst. General Managers, not under a single Manager. Ex.W13 has been given by senior
Manager who could provide uniform to the driver. If the Petitioner was working in the personal capacity as a driver, then
why the Senior Manager recommended to issue uniform to the Petitioner. The Petitioner was maintaining log book
under Ex.W14 which goes to show that the Petitioner was regularly performing his duty. The Learned Counsel for the
Petitioner also contended that working of the Petitioner in a particular place for a long time, maintenance of log books,
issuance of identity card, uniform as well as service certificates and payment of salary through bank account, implies
that, the Petitioner is working regularly and continuously under the Respondents’ bank. But suddenly the Respondent
management terminated the services of the Petitioner without following the provisions required under Sec.25F of the
Industrial Disputes Act, 1947.
10.
In fact, MW1 in his cross examination is unable to file any document to show how the Petitioner was given salary
through bank. He has admitted that the Petitioner was provided with uniform and identity card. The Respondent bank
has not regularized the services of the juniors of the Petitioner. Therefore, MW1 has not given any satisfactory
explanation in his cross examination about how the service of the Petitioner was taken/terminated.
11.
On consideration of the rival contentions of both the sides it is noticed that admittedly, the Petitioner was working
under the Asst. General Manager of the Respondents’ bank from 1.10.1994 to 28.2.2006. The Respondents’ bank has no
where stated that the post of the Asst. General Managers is not transferable and one Manager is continuing in the same
post from 1.10.1994 to 28.2.2006. Therefore, it goes to show that so many Asst. General Managers have worked under
the Respondents’ management in between 1.10.1994 to 28.2.2006 and the Petitioner used to work under them during
that period. If the Petitioner was a personal driver, someone might have dispensed with his service on the event of his
transfer. But, when the Petitioner has worked continuously under the same Asst. General Managers, who has been
posted from time to time, it can not be stated that the Petitioner was a personal driver of any one Asst. General Manager.
Further more, issuance of identity card, uniform, service certificates in favour of the Petitioner also clearly prove that the
Respondents have utilized the services of the Petitioner workman for a long period. Moreover, payment of salary
through account of the Petitioner also prove that the Petitioner was in regular service under the Respondents’ bank. The
service of a driver is perennial in nature and the Petitioner has worked for more than 240 days in a year. When the
Petitioner workman has rendered continuous service to the officers of the Respondents’ bank, when he has been
terminated from service, he should be terminated by following the principles laid down under Sec.25F of the Industrial
Disputes Act, 1947. In fact, without following due procedure, the Respondents’ management has terminated the service
of the Petitioner workman. Admittedly, no appointment order has been given to the Petitioner. But when the
¹Hkkx IIµ[k.M 3(ii)º
Hkkjr dk jkti=k % vxLr 11] [email protected] 20] 1940
5137
Respondents’ bank has utilized the service of the Petitioner for more than a decade, he should not be terminated
without following the legal procedure as laid down under Sec.25F of the Industrial Disputes Act, 1947. Therefore, the
action of the Respondents’ management is not legal and justified.
Thus, Point Nos. I & II are answered accordingly.
12.
Point No.III: In view of the findings given in Point Nos. I & II, the Petitioner is entitled for absorption into
service and also entitled to get retrenchment benefits.
Thus, Point No.III is answered accordingly.
ORDER
In view of the above discussion, the oral termination with effect from 1.3.2006 of Sri M. Raju, Car Driver by the
management of Central Bank of India is not legal and justified and the said order is hereby set aside. The Respondents’
management is directed to consider the Petitioner workman for his reinstatement in their establishment as a full time
driver under the relevant scheme and Rules. If the Petitioner is not eligible under the rules and schemes for conversion
into full time driver, the Respondents’ are at liberty to retrench the Petitioner only by following due procedure as
required under the Industrial Disputes Act, 1947.
Award is passed accordingly. Transmit.
Dictated to Smt. P. Phani Gowri, Personal Assistant transcribed by her corrected by me on this the 29th day of
June, 2018.
MURALIDHAR PRADHAN, Presiding Officer
Appendix of evidence
Witnesses examined for the
Witnesses examined for the
Petitioner
Respondent
WW1: Sri M. Raju
MW1: Sri B. Venkata Ramana
Documents marked for the Petitioner
Ex.W1
:
Identity card issued by the Respondent bank
Ex.W2 to
:
Photostat copies of cheques issued by the Respondent bank
Ex.W11
:
towards monthly salary
Ex.W12
:
Salary certificate issued by the Respondent bank dt. 7.2.2006
Ex.W13
:
Service certificate dt. 13.11.2004
Ex.W14
:
Photostat copy of log book containing 3 pages.
Documents marked for the Respondent
Ex.M1
:
Photostat copy of order of Min. of Finance F.No. 9/5/92-IR dt. 23.6.1997
Ex.M2
:
Photostat copy of order in WP No. 923/1998
ubZ fnYyh] 6 vxLr] 2018
dk-vk- 1218.—vkS|ksfxd fookn vf/fu;e] 1947 (1947 dk 14) dh èkkjk 17 ds vuqlj.k esa dsUnzh; ljdkj eS- osLVuZ
bafM;k f'ki;kMZ fy-] eS- eksjeqxko ejhu ykstsLVhdl izk- fy- ds çcaèkra=k ds lac¼ fu;kstdksa vkSj muds deZdkjksa ds chp] vuqcaèk esa
fu£n"V vkS|ksfxd fookn esa dsUnzh; ljdkj vkS|ksfxd vfèkdj.k@Je U;k;ky; la- 2] eqEcbZ ds iapkV (lanHkZ la[;k 39@2011) dks
çdkf'kr djrh gS] tks dsUnzh; ljdkj dks 06-08-2018 dks çkIr gqvk FkkA
¹la- ,y&36012@1@2011&vkbZvkj (ch&II)º
jfo dqekj] vuqHkkx vf/dkjh
New Delhi, the 6th August, 2018
S.O. 1218.—In pursuance of Section 17 of the Industrial Disputes Act, 1947 (14 of 1947), the Central
Government hereby publishes the Award (Ref. No. 39/2011) of the Central Government Industrial Tribunal-cum-Labour
Court, No. 2, Mumbai as shown in the Annexure, in the industrial dispute between the management of M/s. Western
5138
THE GAZETTE OF INDIA : AUGUST 11, 2018/SRAVANA 20, 1940
[PART II—SEC. 3(ii)]
India Shipyard Ltd., M/s. Mormugao Marine Logistics Pvt. Ltd. and their workmen, received by the Central Government
on 06.08.2018.
[No. L-36012/1/2011-IR (B-II)]
RAVI KUMAR, Section Officer
ANNEXURE
BEFORE THE CENTRAL GOVERNMENT INDUSTRIAL TRIBUNAL NO. 2, MUMBAI
PRESENT : M. V. DESHPANDE, Presiding Officer
REFERENCE NO. CGIT-2/39 of 2011
EMPLOYERS IN RELATION TO THE MANAGEMENT OF
(1) M/S. WESTERN INDIA SHIPYARD LTD.
(2) M/S. MORMUGAO MARINE LOGISTICS PVT. LTD.
(1) The Managing Director,
M/s. Western India Shipyard Ltd.,
Marmugaon Harbour,
Goa – 403 802
(2) The Managing Director,
M/s. Mormugao Marine Logistics Ltd.,
Pvt. Ltd., Marmugaon Harbour,
Goa – 403 803.
AND
THEIR WORKMEN
Mrs. Hamida B. Shaikh,
W/o. Late Mr. Anil Kumar B.,
H. No. 25, New Vaddem,
Vasco-Da-Gama, Goa – 403 802.
APPEARANCES:
FOR THE EMPLOYER
:
Mr. K. S. Kerkar, Advocate
FOR THE WORKMEN
:
Mr. P. J. Augustine, Advocate
CAMP – GOA - dated the 6th June, 2018
AWARD
1.
This is reference made by the Central Government in exercise of powers under clause (d) of sub-section (1) and
sub-section (2A) of Section 10 of the Industrial Disputes Act, 1947 vide Government of India, Ministry of Labour
& Employment, New Delhi vide its order No. L-36012/1/2011 – IR (B-II) dated 19.07.2011. The terms of
reference given in the schedule are as follows :
“Whether the action of the management of M/s. Western India Shipyard Ltd. / M/s. Mormugao Marine Logistics
Ltd. in terminating the employment of Mrs. Hamida B. Shaikh w.e.f. 06.09.2010, is legal and justified ? What
relief the workmsn is entitled to ?“
2.
After the receipt of the reference, both the parties were served with the notices.
3.
Having gone through Roznama, it appears that Reference is fixed for evidence of concerned workman. However it
appears that concerned workman is absent since 13/9/17. She has not filed her affidavit in evidence. Today also
the concerned workman is absent as such the concerned workman has failed to substantiate the Statement of
Claim and therefore the Reference is liable to be rejected and accordingly the Reference is rejected.
ORDER
Reference is rejected.
Date: 06.06.2018
[CAMP – GOA]
M. V. DESHPANDE, Presiding Officer
¹Hkkx IIµ[k.M 3(ii)º
Hkkjr dk jkti=k % vxLr 11] [email protected] 20] 1940
5139
ubZ fnYyh] 6 vxLr] 2018
dk-vk- 1219.—vkS|ksfxd fookn vf/fu;e] 1947 (1947 dk 14) dh èkkjk 17 ds vuqlj.k esa dsUnzh; ljdkj dkanyk iksVZ
VªLV ds çcaèkra=k ds lac¼ fu;kstdksa vkSj muds deZdkjksa ds chp] vuqcaèk esa fu£n"V vkS|ksfxd fookn esa dsUnzh; ljdkj vkS|ksfxd
vfèkdj.k@Je U;k;ky;] vgenkckn (xqtjkr) ds iapkV (lanHkZ la[;k 177@2006) dks çdkf'kr djrh gS] tks dsUnzh; ljdkj dks
06-08-2018 dks çkIr gqvk FkkA
¹la- ,y&37011@2@2006&vkbZvkj (ch&II)º
jfo dqekj] vuqHkkx vf/dkjh
New Delhi, the 6th August, 2018
S.O. 1219.—In pursuance of Section 17 of the Industrial Disputes Act, 1947 (14 of 1947), the Central
Government hereby publishes the Award (Ref. No. 177/2006) of the Central Government Industrial Tribunal-cum-
Labour Court, Ahmedabad (Gujarat) as shown in the Annexure, in the industrial dispute between the management of
Kandla Port Trust and their workmen, received by the Central Government on 06.08.2018.
[No. L-37011/2/2006-IR (B-II)]
RAVI KUMAR, Section Officer
ANNEXURE
BEFORE THE CENTRAL GOVERNMENT INDUSTRIAL TRIBUNAL-CUM-LABOUR COURT,
AHMEDABAD
Present :
Pramod Kumar Chaturvedi,
Presiding Officer, CGIT-cum-Labour Court,
Ahmedabad,
Dated 17th July, 2018
Reference: (CGITA) No. 177/2006
The Chairman,
Kandla Port Trust,
Administrative Office, Post Box No. 50, Gandhidham,
Kutch (Gujarat)
…First Party
V/s
The General Secretary,
Transport and Dock Workers Union,
21, Yogesh Building, Plot No. 586, 12-C,
Kutch (Gujarat)
…Second Party
For the First Party
:
Shri K.V. Gadhia
For the Second Party
:
Shri N.H. Rathod
AWARD
The Government of India/Ministry of Labour, New Delhi by reference adjudication Order No. L-37011/2/2006–
IR(B-II) dated 15.09.2006 referred the dispute for adjudication to the Central Govt. Industrial Tribunal, Ahmedabad
(Gujarat) in respect of the matter specified in the Schedule:
SCHEDULE
“Whether the action of the management of Kandla Port Trust, Gandhidham in not regularising the services of
Shri Gaffor Siddiq Soda, Marine Khalasi, who claimed to have completed 240 days of service in a year is legal
and justified? If not, what relief the workman concerned is entitled to?”
1.
The reference dates back to 15.09.2006 and received on 25.09.2006 from Ministry of Labour and Employment,
New Delhi for adjudication. Both the parties submitted their statement of claim and written statement Ex. 10 and 17
respectively.
2.
But today on 17.07.2018, Shri Nirdosh H. Rathod, advocate for the second party union The General Secretary,
Transport and Dock Workers Union, 21, Yogesh Building, Plot No. 586, 12-C, Kutch (Gujarat) submitted a letter Ex. 20
stating that the workman does not want to prosecute the reference.
5140
THE GAZETTE OF INDIA : AUGUST 11, 2018/SRAVANA 20, 1940
[PART II—SEC. 3(ii)]
3.
Thus the reference is finally disposed of as not pressed.
P. K. CHATURVEDI, Presiding Officer
ubZ fnYyh] 6 vxLr] 2018
dk-vk- 1220.—vkS|ksfxd fookn vf/fu;e] 1947 (1947 dk 14) dh èkkjk 17 ds vuqlj.k esa dsUnzh; ljdkj bafM;u cSad
ds çcaèkra=k ds lac¼ fu;kstdksa vkSj muds deZdkjksa ds chp] vuqcaèk esa fu£n"V vkS|ksfxd fookn esa dsUnzh; ljdkj vkS|ksfxd
vfèkdj.k@Je U;k;ky;] vgenkckn (xqtjkr) ds iapkV (lanHkZ la[;k 107@2010) dks çdkf'kr djrh gS] tks dsUnzh; ljdkj dks 06-08-
2018 dks çkIr gqvk FkkA
¹la- ,y&12012@161@2000&vkbZvkj (ch&II)º
jfo dqekj] vuqHkkx vf/dkjh
New Delhi, the 6th August, 2018
S.O. 1220.—In pursuance of Section 17 of the Industrial Disputes Act, 1947 (14 of 1947), the Central
Government hereby publishes the Award (Ref. No. 107/2010) of the Central Government Industrial Tribunal-cum-
Labour Court, Ahmedabad (Gujarat) as shown in the Annexure, in the industrial dispute between the management of
Indian Bank and their workmen, received by the Central Government on 06.08.2018.
[No. L-12012/161/2000-IR (B-II)]
RAVI KUMAR, Section Officer
ANNEXURE
BEFORE THE CENTRAL GOVERNMENT INDUSTRIAL TRIBUNAL-CUM-LABOUR COURT,
AHMEDABAD
Present :
Pramod Kumar Chaturvedi,
Presiding Officer, CGIT-cum-Labour Court,
Ahmedabad,
Dated 12th July, 2018
Reference: (CGITA) No. 107/2010
The Manager,
Indian Bank,
Personnel Department,
“Toral” Building, Subhash Road,
Rajkot(Gujarat) –360001
…First Party
V/s
Shri Ravjibhai Khodabhai Davera,
C/o Saurashtra Kutch Mazdoor Sangh,
317, Panchnath Commercial Centre,
Harihar Chowk, 3rd Floor,
Dr. Rajendra Prasad Road,
Rajkot (Gujarat) – 360001
…Second Party
For the First Party
:
Shri K.V. Gadhia
For the Second Party
:
Shri Chetan Vyas
AWARD
The Government of India/Ministry of Labour, New Delhi by reference adjudication Order No. L-12012/
161/2000–IR(B-II) dated 07.04.2008 referred the dispute for adjudication to the Industrial Tribunal, Ahmedabad
(Gujarat) in respect of the matter specified in the Schedule:
SCHEDULE
“Whether the claim of Shri Ravjibhai Khodabhai Devera that he has been working continuously as Messenger
w.e.f. April, 1992 and that his services were terminated w.e.f. 11.08.1999 by the management of Indian Bank
without following the provisions of Industrial Disputes Act, 1947 is legal and justified? If so, then what relief
the concerned workman is entitled to?”
¹Hkkx IIµ[k.M 3(ii)º
Hkkjr dk jkti=k % vxLr 11] [email protected] 20] 1940
5141
1.
The reference dates back to 07.04.2008 and was received on 22.04.2008 from Ministry of Labour and
Employment, New Delhi for adjudication. The second party submitted the statement of claim Ex. 3 alleging that he has
been working with the first party Indian Bank, Rajkot since 1992 as Messenger which was of a permanent nature. It is
wrong to say that he was not a temporary or casual worker. He used to do clerical work as and when the regular staffs
remains on leave. He has been working for more than 300 days in each year but his services were terminated on
11.08.1999 without serving notice and paying legal dues and he was also not afforded any opportunity to defend himself.
No departmental enquiry was ordered. Since then he has been unemployed and the first party bank has employed another
person in his place. He sent a registered notice to the bank for reinstatement but to no result. Thus he has prayed for
reinstatement with back wages.
2.
The first party submitted the written statement Ex. 5 denying the averments made in the statement of claim
submitted that the tribunal has no jurisdiction to adjudicate the matter as the workman was a casual worker. The
reference is not maintainable and bad in law because it is a settled law that a person, who is not appointed as per the
recruitment rules of the organisation, will not have a right to reinstatement with or without back wages. It is further
submitted that the second party workman Ravjibhai Khodabhai Devera availed a loan of Rs.95000/- (Rupees Ninety Five
Thousand) under the Prime Minister Rojgar Yojana on 11.06.1996 for running a business of Glass Ware and stop coming
to the bank at his own accord since 11.08.1999 after availing the aforesaid loan. He has concealed the aforesaid facts and
has not come with the clean hands. The first party has not violated the provisions of Industrial Disputes Act and the
reference is liable to be dismissed with on cost.
3.
On the basis of the pleadings, the following issues arise for adjudication:
I.
Whether the claim of Shri Ravjibhai Khodabhai Devera that he has been working continuously as
Messenger w.e.f. April, 1992 and that his services were terminated w.e.f. 11.08.1999 by the management
of Indian Bank without following the provisions of Industrial Disputes Act, 1947 is legal and justified?
II.
To what relief, if any, the workman is entitled?
4.
Issue No. I & II: The burden to prove these issues was on the second party workman. The second party workman
submitted his affidavit Ex. 7 reiterating the averments made in the statement of claim. In his cross-examination, he has
admitted that his date of birth is 18.05.1962. He studied up to 12th standard. There was no advertisement published in
newspaper for the post to which he is seeking claim for appointment. The bank did not give any appointment letter to
him. His name was also not forwarded or recommended by Employment Exchange. He was paid wages on day to day
basis. He had been working as Messenger. He was working on leaving vacancy as and when required. He has produced
the documents regarding working for 240 days in the file. He applied for getting loan to start the business under the
Prime Minister Employment Scheme, 1999. Rs.95000/- loan was sanctioned in the year 1999 for Crockery business. It is
not true that when he started business, he stopped going to bank for employment. He knows that while in employment, he
cannot run business. He re-payed the loan by borrowing. He has 4 family members. He used to spend Rs.10000/- on
family.
5.
The first party bank did not examine any witness but submitted the documents vide list Ex. 8. The documents
reveals that the workman was sanctioned a loan of Rs.95000/- on 15.06.1999 for running the shop of Crockery and Glass
Wares.
6.
These documentary evidences have not been controverted by the second party workman. Thus the averments
made in the statement of claim and affidavit appears to be non-believable and the workman has failed to establish his
case.
7.
Thus the reference has no force and liable to be decided in negative.
8.
Thus the reference is disposed of with the observation as under: “the claim of Shri Ravjibhai Khodabhai Devera
that he has been working continuously as Messenger w.e.f. April, 1992 and that his services were terminated w.e.f.
11.08.1999 by the management of Indian Bank without following the provisions of Industrial Disputes Act, 1947 can be
said to be illegal and unjustified.”
P. K. CHATURVEDI, Presiding Officer
ubZ fnYyh] 6 vxLr] 2018
dk-vk- 1221.—vkS|ksfxd fookn vf/fu;e] 1947 (1947 dk 14) dh èkkjk 17 ds vuqlj.k esa dsUnzh; ljdkj cSad vkWiQ
cM+kSnk ds çcaèkra=k ds lac¼ fu;kstdksa vkSj muds deZdkjksa ds chp] vuqcaèk esa fu£n"V vkS|ksfxd fookn esa dsUnzh; ljdkj vkS|ksfxd
vfèkdj.k@Je U;k;ky;] vgenkckn (xqtjkr) ds iapkV (lanHkZ la[;k 571@2004) dks çdkf'kr djrh gS] tks dsUnzh; ljdkj dks 06-08-
2018 dks çkIr gqvk FkkA
¹la- ,y&12012@107@2003&vkbZvkj (ch&II)º
jfo dqekj] vuqHkkx vf/dkjh
5142
THE GAZETTE OF INDIA : AUGUST 11, 2018/SRAVANA 20, 1940
[PART II—SEC. 3(ii)]
New Delhi, the 6th August, 2018
S.O. 1221.—In pursuance of Section 17 of the Industrial Disputes Act, 1947 (14 of 1947), the Central
Government hereby publishes the Award (Ref. No. 571/2004) of the Central Government Industrial Tribunal-cum-
Labour Court, Ahmedabad (Gujarat) as shown in the Annexure, in the industrial dispute between the management of
Bank of Baroda and their workmen, received by the Central Government on 06.08.2018.
[No. L-12012/107/2003-IR (B-II)]
RAVI KUMAR, Section Officer
ANNEXURE
BEFORE THE CENTRAL GOVERNMENT INDUSTRIAL TRIBUNAL-CUM-LABOUR COURT,
AHMEDABAD
Present :
Pramod Kumar Chaturvedi,
Presiding Officer, CGIT-cum-Labour Court,
Ahmedabad,
Dated 17th July, 2018
Reference: (CGITA) No. 571/2004
The Regional Manager,
Bank of Baroda,
Opp. Reserve Bank of India,
Near ADC Bank, Ashram Road,
Ahmedabad (Gujarat) – 380014
…First Party
V/s
Shri Harshad Manubhai Brahmbhatt,
1119, Vasudev’s Vadi, Lohar Sheri, Saraspur,
Ahmedabad (Gujarat)
…Second Party
For the First Party
:
Shri V.K. Mashar
For the Second Party
:
Shri V.J. Patel
AWARD
The Government of India/Ministry of Labour, New Delhi by reference adjudication Order No. L-12012/
107/2003–IR(B-II) dated 14.08.2003 referred the dispute for adjudication to the Industrial Tribunal, Ahmedabad
(Gujarat) in respect of the matter specified in the Schedule:
SCHEDULE
“Whether the action of the management of Bank of Baroda in not considering candidature/application of Shri
Harshad Manubhai Brahmbhatt in response of advertisement dated 14.08.1991 was justified and legal? If not,
to what relief the workman is entitled?”
1.
The reference dates back to 14.08.2003 and received on 29.09.2003 from Ministry of Labour and Employment,
New Delhi for adjudication. The second party workman Harshad Manubhai Brahmbhatt, hereinafter referred to as
“workman” submitted the statement of claim Ex. 8 alleging that he has been appointed and working as Peon on daily
rated basis from 1982 to 1990 in different branches of Bank of Baroda, Ahmedabad and worked till 1993. He worked for
338 days during the aforesaid period. An advertisement was issued in daily Newspaper “Sandesh”, a Gujarati daily
Newspaper on 14.08.1991 stating that a workman who worked 90 days in Bank of Baroda during 1982 to 1990, may
apply for regular appointment. In pursuance of the advertisement, he applied for such appointment submitting the School
Leaving Certificate regarding age and qualification and also his work experience in different branches where he served.
2.
The second party workman further alleged that he was not informed regarding the result of such process;
therefore, he approached the Employees’ union regarding the said process. He was told that his application was rejected
being incomplete. He has further alleged that he worked for 338 days in different 7 branches of Bank of Baroda during
the aforesaid period and the said letters were also submitted to the authority but he was not short listed while other
candidates who were short-listed were junior to him/later appointed in service as casual worker. He has further alleged
that out of 9 branches where he served, 2 branches of the bank deliberately did not issue him the work certificate. Thus
he has alleged that his exclusion from the list of short-listed candidates was arbitrary, discriminatory, biased and against
¹Hkkx IIµ[k.M 3(ii)º
Hkkjr dk jkti=k % vxLr 11] [email protected] 20] 1940
5143
the principle of natural justice. Thus he has prayed for declaring his exclusion from the short-listed candidates as illegal
and also prayed for appointment as permanent employee with all benefits.
3.
The first party The Regional Manager, Bank of Baroda, Opp. Reserve Bank of India, Near ADC Bank, Ashram
Road, Ahmedabad, hereinafter referred to as “Bank” submitted the written statement Ex. 9 partly admitting the
averments made in the statement of claim regarding his working as daily wager but the details averments are not
admitted. The Bank has further submitted that the second party workman has never been employee of the Bank and was
not appointed or employed by the Bank as per rules and regulations of the Bank. He has never completed 240 days in any
calendar year. There was no master servant relationship between the Bank and the workman. No Branch Manager as per
the Rules and Regulations of the Bank is authorised or competent to appoint any employee. Employment in the Bank is a
public employment under State as per the provisions of Article 14 and 16 of the Constitution of India. There is no
violation of Section 25 B of the Industrial Disputes Act as the second party workman has not worked for 240 days in any
calendar year. But it is an admitted that the Bank has published an advertisement in Gujarat Daily Newspaper “Sandesh”
on 14.08.1991 inviting applications for preparing panel of candidates who have worked for more than 90 days at any
branch or office of the Bank situated in India between 01.01.1982 to 31.12.1990 for considering the filing of vacancies
provided they fulfil following conditions:
“i.
The candidate should have passed 7th standard, however, should not have studied beyond 8th standard. He
should have completed 18 years of age, however at the time of first engagement he should not have
completed 26 years.
ii.
His appointment and service are subject to reservation for SC, ST, Phy. Handicapped, Ex-servicemen etc.
and subject to permission of Director General, Employment and Training.
4.
It is further submitted that the application should accompany the proof of date of birth, certificate of educational
qualification, work experience which would have been lacking in the case of this workman, therefore, the application
might have not been considered. It is further submitted that the workman also might have not been completed the
required tenure of engagement, hence his application might have not been considered.
5.
It is noteworthy that the first party Bank is not certain in his averments made in the written statement that whether
the workman was fulfilling the criteria or not.
6.
On the basis of the pleadings, the following issues arise for adjudication:
I.
Whether the action of the management of Bank of Baroda in not considering candidature/application of
Shri Harshad Manubhai Brahmbhatt in response of advertisement dated 14.08.1991 was justified and
legal?
II.
To what relief, if any, the workman is entitled?
7.
Issue No. I & II: Both the issues are interrelated, therefore, decided together. The burden to prove these issues
was lying on the second party workman. The second party workman submitted his affidavit Ex. 21 and documents vide
list Ex. 20. The first party Bank has also filed the documents vide list Ex.12 more or less the same which the workman
has filed.
8.
The second party workman in his affidavit Ex. 21 has reiterated the averments made in the statement of claim
Ex. 8 and in his cross-examination, he has stated that he was not a regular employee of the Bank. He was appointed on
daily wage basis. He has not been given certificate of the actual working days of his work done in the Bank. The Bank
denied to have given such certificates. He worked lastly in the year 1993. The advertisement came in the year 1991. He
was not given any letter by the Bank. The Bank has denied considering his name for regularisation. He is 8th standard
pass. The advertisement was made for preparation of list of employees for absorption who worked for 90 days in a
calendar year. He applied within the prescribed time for absorption.
9.
The first party Bank submitted the affidavit of Shri Rajesh Gohel, Chief Manager, Bank of Baroda stating that the
workman has never been employee of the Bank. He never completed 240 days in the calendar year. No Branch Manager
can employee any person as per the rules of the Bank. The Bank published an advertisement in Gujarat Daily Newspaper
“Sandesh” on 14.08.1991 inviting applications for preparing panel of candidates who have worked for more than 90 days
at any branch or office of the Bank situated in India between 01.01.1982 to 31.12.1990 for considering the filing of
vacancies provided they fulfil following conditions:
“i.
The candidate should have passed 7th standard, however, should not have studied beyond 8th standard. He
should have completed 18 years of age, however at the time of first engagement he should not have
completed 26 years.
ii.
His appointment and service are subject to reservation for SC, ST, Phy. Handicapped, Ex-servicemen etc.
and subject to permission of Director General, Employment and Training.”. He has further stated that the
5144
THE GAZETTE OF INDIA : AUGUST 11, 2018/SRAVANA 20, 1940
[PART II—SEC. 3(ii)]
workman might have applied but in the absence of proof of engagement, his application might have not
been considered. He has not said anything contrary in his cross-examination.
10.
I considered the arguments of advocates and evidences of both the parties. The cross-examination and
examination-in-chief of the first party witness Shri Rajesh Gohel and also averments made in the written statement
reveals that the first party Bank is not certain as to why and on what basis the application of the workman for
consideration in the preparation of panel was rejected because the witness as well as the written statement reveals that
both the averments and the statement on oath based on assumptions that the application might have been incomplete,
therefore, might have not been considered. Assumptions have no value in the eye of law. Once the workman has stated
on oath that he submitted his application for consideration in the preparation of panel of short-listed candidates with a
proof of age and qualification by way of School Leaving Certificate and work experience and has also filed the
documentary evidence in regard the same then it is the duty of the first party Bank of Baroda to rebut the same which has
not been done by the first party Bank.
11.
Thus in the light of the aforesaid discussions, I come to the conclusion that the second party workman has applied
his name for consideration to be in the penal of the short-listed candidates with a proof vide documents Ex. 20/4 making
it clear that he worked for 338 days in the period of consideration zone. Thus the workman was entitled to be included in
the panel of short-listed candidates. It is also not properly denied that junior candidates have not been appointed;
therefore, it would be equitable and just that the workman should be ordered to be appointed as a regular employee with
Rs.100000/- (Rupees One Lac) in lieu of back wages.
12.
Thus both the issues are decided accordingly in the absence of proper evidence on the part of the first party Bank
with an observation that the action of the management of Bank of Baroda in not considering candidature/application of
Shri Harshad Manubhai Brahmbhatt in response of advertisement dated 14.08.1991 was unjustified and illegal.
13.
The first party Bank of Baroda is directed to appoint Harshad Manubhai Brahmbhatt as Peon and also to pay
Rs.100000/- (Rupees One Lac) as lump-sum compensation in lieu of back wages within 60 days from the publication of
the award.
14.
The award is passed accordingly.
P. K. CHATURVEDI, Presiding Officer
ubZ fnYyh] 6 vxLr] 2018
dk-vk- 1222.—vkS|ksfxd fookn vf/fu;e] 1947 (1947 dk 14) dh èkkjk 17 ds vuqlj.k esa dsUnzh; ljdkj us'kuy
ba'kksjsal dEiuh fy- ds çcaèkra=k ds lac¼ fu;kstdksa vkSj muds deZdkjksa ds chp] vuqcaèk esa fu£n"V vkS|ksfxd fookn esa dsUnzh; ljdkj
vkS|ksfxd vfèkdj.k@Je U;k;ky;] dksydkrk ds iapkV (lanHkZ la[;k 24@2002) dks çdkf'kr djrh gS] tks dsUnzh; ljdkj dks
06-08-2018 dks çkIr gqvk FkkA
¹la- ,y&17011@20@2002&vkbZvkj (ch&II)º
jfo dqekj] vuqHkkx vf/dkjh
New Delhi, the 6th August, 2018
S.O. 1222.—In pursuance of Section 17 of the Industrial Disputes Act, 1947 (14 of 1947), the Central
Government hereby publishes the Award (Ref. No. 24/2002) of the Central Government Industrial Tribunal-cum-Labour
Court, Kolkata as shown in the Annexure, in the industrial dispute between the management of National Insurance Co.
Ltd. and their workmen, received by the Central Government on 06.08.2018.
[No. L-17011/20/2002-IR (B-II)]
RAVI KUMAR, Section Officer
ANNEXURE
CENTRAL GOVERNMENT INDUSTRIAL TRIBUNAL AT KOLKATA
Reference No. 24 of 2002
Parties:
Employers in relation to the management of National Insurance Co. Ltd.
A N D
Their workmen
¹Hkkx IIµ[k.M 3(ii)º
Hkkjr dk jkti=k % vxLr 11] [email protected] 20] 1940
5145
Present : Justice Ravindra Nath Mishra, Presiding Officer
Appearance:
On behalf of the Management
:
Mr. Ranjay De, Ld. Counsel.
On behalf of the Workmen
:
Mr. Madhusudan Dutta, Ld. Counsel.
State: West Bengal
Industry: Insurance
Dated: 16th July, 2018
AWARD
By Order No.L-17011/20/2002-IR(B-II) dated 23.10.2002 the Government of India, Ministry of Labour in
exercise of its powers under Section 10(1)(d) and (2A) of the industrial Disputes Act, 1947 referred the following dispute
to this Tribunal for adjudication:
“Whether any employer-employee relationship exists between the management of National Insurance Co. Ltd.
(NICL) Kolkata and the three disputants viz. S/Shri Pankaj Kar, Sunil Kumar Pramanik and Gopinath Ghosh?
If so, whether their claim for absorption in the service of NICL is legal and justified and what relief are they
entitled to?”
2.
Above reference has been made by the Central Government at the instance of Eastern Zone General Insurance
Employees Union which claims to be only representative trade union functioning in general insurance industry. In
statement of claims filed by the union it is stated that the concerned workman, Shri Pankaj Kar engaged in Regional
Office – 1 of National Insurance Co. Ltd. performed the job of electrical maintenance in the Company. He also
performed the duties of water pump operator as well as generator operator in different phases of a day. Another
workman, Shri Sunil Pramanik who was engaged in the Head Office Wing of Kolkata with effect from 1978 was
assigned the job of a permanent Class-III as well as Class-IV employee of handling cash withdrawal, disbursement of
salary of the employees under the instruction and supervision of competent authority. Third workman, Shri Gopinath
Ghosh was engaged in Divisional Office – XI with effect from 14th February, 1981. He was assigned job of depositing
and withdrawing money in the Bank, regular job of electrical maintenance and carrying official letters to Regional Office
and Head Office for hand delivery etc. It is stated t5hat all the jobs done by above three workmen were of perennial
nature, but the Company with malafide motive to exploit their human labour sometimes called them “contractor labour”,
sometimes “casual labour” and sometimes “badli” only to compel them to work in starving wages. The job for which
above three workmen are engaged, are mostly done by permanent workmen in similar industry and they do get salary
accordingly. The company to camouflage the real state of affairs tries to show a sham contract in conciliation
proceedings only to deprive the concerned workmen from their legitimate claim for absorption in service. The
contractors who were sought to be shown as supplier of labours had no license as required under the Act proving thereby
that there had been no real contractor within the meaning of the said Act. The story of so called contractor was cooked up
to avoid regularization of service of the workmen. When the management did not pay any heed to their grievance, the
union raised an industrial dispute before the Regional Labour Commissioner (Central), Kolkata. But, due to adamant
attitude of the company, the conciliation proceedings failed resulting in reference of industrial dispute by the Central
Government.
3.
The management of National Insurance Co. Ltd. filed its written statement denying all the allegations of the union
and pleaded inter alia that the reference is not maintainable as no dispute has been properly raised so as to transform the
alleged dispute to be industrial dispute. The reference is also not maintainable since there was no subsistence of employer
– employee relationship between the company and the persons concerned. The trade union at the instance of which
reference has been made is not representative of the workmen thus it has no locus standi. It is baseless to state that
workmen, S/Shri Pankaj Kar, Sunil Kumar Paramanik and Gopinath Ghosh were engaged by the company. There cannot
be engagement, unless vacancies are determined which are absent in the instant case. There cannot be any recruitment
without the candidate being recommended by the Employment Exchange. Any casual work as a daily wager for few days
cannot ripe into regular work and such work is dehors of norms of engagement and as such cannot have any validity in
the eye of law. The allegation of sham contract is baseless. There is no camouflage of real state of affairs and there is no
scope for absorption and contention of the union on this score is totally baseless. The company always complied with the
statutory provisions including compliance with the provisions of Contract Labour (Regulation & Abolition) Act, 1970.
The claim of workmen is not valid or legal or justified and they are not entitled to any relief whatsoever.
4.
A rejoinder was filed on behalf of the union reiterating the pleas made in the statement of claims.
5.
On behalf of union WW-01, Shri Samarandra Nath Sanyal, WW-02, Shri Kushal Nag, WW-03, Shri Pankaj Kar
and WW-04, Shri Gopinath Ghosh have been examined and on behalf of the management MW-01, Shri S.S. De has been
examined. Apart from this, documentary evidence have also been filed on behalf of the union which shall be discussed as
and when required.
5146
THE GAZETTE OF INDIA : AUGUST 11, 2018/SRAVANA 20, 1940
[PART II—SEC. 3(ii)]
6.
I have heard learned counsel for the union as well as for the management. From the submission made by the
learned counsel for both the parties following points emerge for determination in order to answer the reference – (i)
whether the union which espoused the cause of three workmen has got any locus standi and (ii) whether there is any
relationship of employer and employee between the management of the company and the concerned workmen.
7.
It is not disputed that formation of opinion by the appropriate government can be questioned by Industrial
Tribunal on ground that condition precedent for making reference is absent. In order to determine whether an individual
dispute has been transformed into an industrial dispute under the provisions of Industrial Disputes Act, 1947, we must
first peruse the definition of industrial dispute as given in Section 2(k) of the Industrial Disputes Act, 1947 which is
quoted below:
“(k) “industrial dispute” means any dispute or difference between employers and employers, or between
employers and workmen, or between workmen and workmen, which is connected with the employment or non-
employment or the terms of employment or with the conditions of labour, of any person.”
8.
In the instant case, it is not disputed that the union has espoused the cause of the concerned workmen but before it
can be said to be an industrial dispute, the representative character of the trade union has to be seen. The learned counsel
for the management has submitted that the three workmen had never been member of the union, therefore, the union has
no locus standi to espouse their cause. For his argument learned counsel for the management has referred cross-
examination of WW-01, Samarendra Nath Sanyal in which he has admitted that he had not filed any document to show
that the persons named in the schedule of reference are members of the union. They also did not take part in the check off
system. He has further deposed that the persons named in the schedule of reference never worked under him, nor did they
work in Division – XII. He has stated to have knowledge of their working. WW-02, Kushal Nag has stated that in written
statement it is not mentioned that these persons are members of the union. No resolution of the union has been filed to
show that union took a decision to espouse the cause of the workmen, even no document has been filed to show that the
concerned persons ever applied to the union for membership. The statement of WW-03, workman Shri Pankan Kar is
worth mentioning –
“I know there are several workmen unions in our office. I was never called upon to cast any vote in respect of any
of such union.
I am not a member of any union in the office of the company. I do not know which workmen union is conducting
the present reference on behalf of the workmen union.”
9.
Thus from the evidence of the union itself it is established that the workmen concerned were not member of the
union. They never participated in activities of the union.
10.
In U.P. State Warehousing Corporation & Anr. v. Presiding Officer, Industrial Tribunal & Anr., CDJ 2013 All HC
at page 64 it has been held that
“It is settled law that a person who files a claim is required to prove his case. The industrial dispute was
raised at the instance of the union, and even though, the provisions of Evidence Act is not applicable in
industrial proceedings, nonetheless, the burden of proof is upon the union and its workers to prove their claim
before the Labour court.”
Thus burden lies upon the union to prove that the union has representative character and for that it has to show
that the concerned workmen are members of the union.
11.
Learned counsel for the union has argued that the definition of industrial dispute as given in Industrial Disputes
Act, 1947 nowhere says that the cause of the concerned workmen can only be espoused by a union only and also that for
espousal of cause it is not necessary that the union should be registered. For his submission learned counsel has relied on
Secretary (Policy), Regional Director (Food) Employees Association v. Food Corporation of India & Ors., 2001-I-LLJ
203 in which it has been categorically held by the Hon’ble Calcutta High Court that for the purpose of raising an
industrial dispute on behalf of the workman it is not necessary that a trade union must be recognized one. Even some of
the other workmen are entitled to raise an industrial dispute on behalf of the concerned workmen. The learned counsel
has further relied on Jadhav J.H. v. Forbes Gokak Ltd., 2005-I-LLJ (SC) 1089 for his submission that the words any
person used in definition in Section 2(k) of the Industrial Disputes Act sufficiently shows that for espousal of cause of a
concerned workman it is not necessary that union should come forward. Even a group of workmen can espouse cause of
the aggrieved workman. In the above case of Jadhav J.H. (supra) Hon’ble the Apex Court has approved its previous
decision in Workmen of Dharmpal Premcand (Saughandhi) v. Dharmpal Premchnd (Saughandhi), AIR 1966 SC 182
wherein it was held that
“…….for the purpose of section 2(k) it must be shown that (1) the dispute is connected with the employment or
non-employment of a workman. (2) the dispute between a single workman and his employer is sponsored or
espoused by a union of workmen or by a number of workmen. The phrase “the union” merely indicates the
¹Hkkx IIµ[k.M 3(ii)º
Hkkjr dk jkti=k % vxLr 11] [email protected] 20] 1940
5147
Union to which the employee belongs even though it may be a Union of a minority of workmen. (3) the
establishment had no Union on its own and some of the employees had joined the Union of another
establishment belonging to the same industry. In such a case it would be open to that Union to take up the
cause of the workmen if it is sufficiently representative of those workmen, despite the fact that such Union was
not exclusively of the workmen working in the establishment concerned.”
12.
Further, reliance has been placed by the learned counsel for the union on Standard Vacuum Refining Company of
India Ltd. v. their workmen & Anr., 1960-II-LLJ 233 where elaborating the principle of espousal, Hon’ble the Apex
Court has held with approval of its previous judgment given in workmen of Demakuchi Tea Estate v. management of
Dimakuchi Tea Estate, 1958-I-LLJ 500 that there must be a community of interest with the workmen who are affected
and the workmen who have espoused the cause. They must have also a substantial interest in the subject matter of dispute
in the sense that the class to which they belong is substantially affected thereby. The test, therefore, to be applied in
determining the scope of the words “any person” in Section 2(k) was stated in Dimakuchi case (supra) in the following
words:
“If, therefore, the dispute is a collective dispute, the party raising the dispute must have either a direct interest
in the subject matter of dispute or a substantial interest therein in the sense that the class to which the
aggrieved party belongs is substantially affected thereby. It is the community of interest of class as a whole -
class of employers or class of workmen – which furnish the real nexus between the dispute and the parties to
the dispute. We see no insuperable difficulty in the practical application of this test. In a case where a party to
a dispute is composed of aggrieved workmen themselves and the subject-matter of the dispute relates to them
or any of them, they clearly have a direct interest in the dispute. Where, however, the party to the dispute also
composed of workmen espouse the cause of another person whose employment or non-employment, etc., may
prejudicially affect their interest, the workmen have a substantial interest in the subject-matter of dispute. In
both such cases the dispute is an industrial dispute.”
13.
In another case, Western India Match Co. Ltd. vs. Western India Match Co. Workers Union & Others, AIR 1970
SC 1205 discussing the necessity of membership of espousing union, Hon’ble the Apex Court has observed that:
“If it is insisted that the concerned workman must be a member of the union at the time of his dismissal, the
result would be that if at the period of time there is no union in particular industry and it comes into existence
later on then the dismissal of such a workman can never be an industrial dispute although the other workmen
have a community of interest in the matter of their dismissal and the cause for which or the manner in which
his dismissal is brought about directly and substantially affects the other workmen”
It has been further clarified that –
“The only condition for an individual dispute turning into an industrial dispute as laid down in the case of
Dimakuchi Tea Estate (supra) is the necessity of community of interest and not whether the concerned
workman was or was not a member of the union at the time of his dismissal.”
14.
Thus from the above discussion, it is established that the workmen having a substantial interest in the subject
matter of the dispute and having a community of interest can espouse the cause of any person. The community of interest
does not depend on whether the concerned workman was a member or not at the time when cause occurred. Now the
question is whether the workman concerned have any community of interest with the employees of National Insurance
Company Ltd or in other words whether the employees of National Insurance Company Ltd. have substantial interest in
the subject matter of the dispute so as to espouse the cause of the affected workmen. In the instant case the concerned
workmen have claimed their absorption in service of National Insurance Company. From the evidence available on
record it is not established that apart from these three workmen, similar issues have also been raised by other persons
also. For community of interest, it is necessary that in case the issue is decided in negative, the interest of other persons
are adversely affected, but there is no evidence to show it. There is no evidence on record to show that the members of
the union who are employees of the Company have any community of interest with the affected persons.
15.
In view of above discussion, it is evident that in absence of any resolution of union espousing the cause of the
concerned workmen and also absence of community of interest of workmen with concerned workmen, the union has no
locus standi to espouse the cause of the concerned workmen and therefore, reference is incompetent.
16.
Though learned counsel for the union has also relied on Hotel Imperial, New Delhi v. Chief Commissioner, Delhi,
1959-II-LLJ 553, but I do not find any applicability of this case in the present one. In above referred case the dispute was
regarding mention of name of the union in reference order which was found to be not illegal and which does not
invalidated the reference order.
17.
Though this reference can be disposed only on the ground that it is incompetent reference because of union having
no locus standi, but I think it just and proper to deal with the point referred by the Central Government regarding
5148
THE GAZETTE OF INDIA : AUGUST 11, 2018/SRAVANA 20, 1940
[PART II—SEC. 3(ii)]
subsistence of relationship of employer and employee between the management of National Insurance Company Ltd.,
Kolkata and the concerned workmen.
18.
While dealing with the relationship of employer and employee, question immediately emerges as to what are the
tests to decide the relationship. Hon’ble the Apex Court in Balwant Rai Saluja & Anr. V. Air India & Ors., 2014 (9)
SCALE 567 = CDJ 2014 SC 694 while determining the relationship of employer and employee has held as follows:
“61.
Thus, it can be concluded that the relevant factors to be taken into consideration to establish an
employer – employee relationship would include, inter alia, (1) who appoints the workers; (ii) who pays the
salary/remuneration; (iii) who has the authority to dismiss; (iv) who can take disciplinary action; (v) whether
there is continuity of service; and (vi) extent of control and supervision, i.e. whether there exists complete
control and supervision. As regards, extent of control and supervision we have already taken note of the
observations in Bengal Nagpur Cotton Mills case (supra), the International Airport Authority of India case
(supra) and the NALCO case (supra).”
19.
The aspect of relationship of employer – employee is a pure question fact and initial burden is on the person who
claims the existence of employer – employee relationship. The aspect of burden of proof has been elaborately dealt with
by Hon’ble the Apex Court in Nilgiri Cooperative Marketing Society Limited v. State of Tamilnadu and Ors., JT 2004
(2) SC 51 wherein it has been held that
“47. It is well settled principle of law that the person who sets up a plea of existence of employer employee
relationship, the burden would be upon him.
48.
In N.C. Jhon vs. Secretary, Thodupuzha Taluk Shop and Commercial Establishment Workers’ Union &
Ors. (1973 Lab. I.C. 398) the Kerala High Court held –
“The burden of proof being on the workmen to establish the employer employee relationship an adverse
inference cannot be drawn against the employer that if he were to be produce books of account they would
have proved employer employee relation.”
49.
In Swapan Dasgupta and Ors. vs. The First Labour Court of West Bengal and Ors. (1976 Lab. I.C.
202) it has been held –
“where a person asserts that he was a workman of the Company and it is denied by the Company, it is for him
to prove the fact. It is not for the Company to prove that he was not an employee of the Company but of some
other persons.”
50.
The question is whether the relationship between the parties is one of the employer and employee is a
pure question of fact…………”
20.
Further in a case of Bank of Baroda v. Ghemar Bhai Harjibhai Rabary, 2005 (3) Scale 353 Hon’ble the Supreme
Court has observed –
“8.
While there is no doubt in law that the burden of proof that a claimant was in the employment of a
management, primarily lies on the workman who claims to be a workman. The decree of such proof so
required vary from case to case.”
21.
Hon’ble the Allahabad High Court in U.P. State Warehousing Corporation case (supra) has lucidly pointed out
that where the stand of the union is that the members are employed by the employer and that they being paid wages
through them, it is for the union to prove by oral as well as documentary evidence and only then the burden is discharged.
Thus from the above case laws it is amply clear that the initial burden to prove the relationship of employer and
employee lies on the union/workman and once this initial burden is discharged, onus shifts upon the employer. In the
present case, in order to prove relationship of employer and employee, the union has examined four witnesses who have
deposed before this Tribunal. WW-01, Shri Samarandra Nath Sanyal has stated “I have not filed any document to show
that the persons named in the schedule of reference are members of our union. They did not take part in the check-off
system”. Further, WW-02, Shri Kusal Nag in his cross-examination has deposed as follows:
“There is nothing on record to show that salaries have been received at a time for a month by the concerned
persons.”
He has further stated that “We have not filed any document to show that they have ever applied to the
management for any kind of post.” Though WW-02 has stated that he was recruited in the Company through a
recruitment process, this fact is not mentioned in the written statement of the union as to how the concerned
persons were recruited.
22.
WW-03, Shri Pankaj Kar has stated as follows:
¹Hkkx IIµ[k.M 3(ii)º
Hkkjr dk jkti=k % vxLr 11] [email protected] 20] 1940
5149
“I registered my name in the Employment Exchange, but it lapsed. I cannot tell the number of my card or the
date when I was registered. The sub-staff belongs to Class-IV category. I cannot say how the sub-staff were
recruited in the Company. ………… I have not submitted any document to show that the Company appointed
me. I have not submitted any document to show that the Company ever paid me salary. ………. I have not
filed any paper here in support of my claim that I am working in the Company continuously till today.”
23.
The statement of concerned workman, Shri Gopinath Ghosh examined as WW-04 having bearing on the point in
issue may be quoted below:
“My name was registered in the Employment Exchange but since I did not renew my registration, perhaps my
name is stuck out. I have not filed any paper in respect of my registration with the Employment Exchange.”
……..I have applied in writing for the post of peon in the National Insurance Company. I know how the
salaries of employees of the Company is being disbursed at the end of month and it is done by way of
preparation of pay sheet and also by way of issue of cheque in the name of the employees having salary above
ten thousand and by cash for the salary below ten thousand. I have never drawn any salary by following the
said procedure. ……….”
I have never received any appointment letter from the Company to join in their job in 1981 or any time
thereafter.
I have never received any letter from the Company fixing my duty hours on the office to work between 10
A.M. to 6 P.M. I have no paper to prove that I am working in the National Insurance Co. from 1981 till date.
…..
I was never issued with any pay sheet or pay slip by the Company towards payment of wages. Not a fact that I
never drew any salary or wage from the Company in the system of payment at the end of the month. ……..
It is a fact that the National Insurance Co. never pays the salary through vouchers to its employees. Not a fact
that I have got no relation of employer and employee with the National Insurance Company.”
24.
Contrary to the statement of witnesses examined on behalf of the union, the management witness, Shri S.S. De has
filed his affidavit stating that the concerned workmen were never recruited and they were never engaged by the
Company. He has also stated that there are recruitment rules in the Company. As per recruitment rules vacancies are
determined before recruitment. Shri Pankaj Kar was a contract workman working under M/s. Laxmi Narayan Electrical
Works. The said Company used to undertake Generator/Electrical maintenance jobs at the material point of time. Other
workman, Shri Gopinath Ghosh was also not engaged by the National Insurance Company directly. He was engaged
through contractor M/s. New Calcutta Diesel and as such there is direct employer – employee relationship with the
management. Shri Sunil Pramanik though was engaged by the Company directly but payments were made job-wise. His
job was not of perennial nature. Thus, testimony of management witness finds support from the statement of WW-01,
Shri Samarendra Nath Sanyal when he says that he has not produced any document to show that the persons named in the
order of reference were ever appointed as employee of the Company. There is no mention in the written statement of the
union that the persons named in the order of reference were paid salary through vouchers. WW02, Shri Kusal Nag has
also deposed that he was recruited by the Company through a recruitment process. There is no mention in the written
statement of the union as to how the concerned workmen were recruited. He has also stated that he is an employee of the
Company and receives salary month by month, but no document has been filed on record to show that the persons
concerned were ever paid salary by the Company and the management of the Company ever directed them to do all
works. WW-03, Shri Pankaj Kar has also admitted that he does not have any document to show that the Company ever
appointed him and paid salary. There is nothing to show that the Company ever instructed him to do any work. Similar is
the statement of WW-04, Shri Gopinath Ghosh. It is pertinent to note here that the union has not examined the third
workman, Shri Sunil Kumar Pramanik to substantiate his own case. Thus statements of witnesses of union do not support
its case, rather demolished the case.
25.
Learned counsel for the union has submitted that even if it is assumed that the workman, Shri Pankaj Kar and
Shri Gopinath Ghosh were engaged through contractor, same also establishes relationship of employer and employee
between the Company an the workmen, as the alleged contractor had no license to supply contract labour, nor the
Company was registered as principal employer as required under the Contract Labour (Regulation and Abolition) Act,
1970. Thus, he has argued that that the contract was mere sham contract and the management in order to camouflage the
real picture has tried to show a sham contract only to deprive the concerned workmen from their legitimate claim of
absorption in service.
26.
Contrary to it, learned counsel for the Company has submitted that though the contractor and the Company had no
valid license to supply contract labour and as principal employer respectively under the above Act of 1970, that does not
cloth the contract labours with legal right to claim that they are direct employees of the Company. The relevant portion of
5150
THE GAZETTE OF INDIA : AUGUST 11, 2018/SRAVANA 20, 1940
[PART II—SEC. 3(ii)]
the judgment of the Hon’ble Calcutta High Court in M/s. Iron & Steel Company Limited v. State of West Bengal, CDJ
201 Cal 446 having direct bearing on the issue is quoted below:
“20.
………. Non-obtention of licence without anything more, would not clothe the added respondents with
any legal right to claim that they are direct employees of the company and hence entitled to continue in service
despite the contract with Kaycee not being renewed.”
27.
Learned counsel for the union has relied on decision of Hon’ble the Supreme Court in Secretary, Hariyana
Electricity Board v. Suresh & Others, 1999-I-LLJ 1086 facts of which are similar to that of the present case and has
argued where there is no registration of contractor and principal employer, the principal employer is under statutory
obligation to absorb the contract labour. Once the board was not principal employer and the socalled contractor was not
licensed contractor, the inevitable conclusion that had to be reached was to the effect that the socalled contract system is
a mere camouflage, smoke and a screen and disguised in almost a transparent wheel which could easily be pierced and
the real contractual relationship between the board on one hand and the employee on the other hand could easily be
visualized. However, learned counsel for the management has submitted that the above decision was based on Hon’ble
Apex Court’s judgment passed in Air India Statutory Corporation etc. v. United Labour Union & Ors., 1997-I-LLJ 1113
which has been overruled by Five Judges Bench of Hon’ble the Apex Court in Steal Authority of India Ltd. v. National
Union of Waterfront Workers & Ors., CDJ 2001 SC 517. Relevant portion of which may quoted as below:
“96.
While this was the state of law in regard to the contract labour, the issue of automatic absorption of the
contract labour came up before a Bench of three learned Judges of this Court in Air India’s case (supra). The
Court held: (1) though there is no express provision in the CLRA Act for absorption of the contract labour
when engagement of contract labour stood prohibited on publication of the notification under Section 10(1) of
the Act, from that moment the principal employer cannot continue contract labour and direct relationship gets
established between the workmen and the principal employer; (2) the Act did not intend to denude the contract
labour of their source of livelihood and means of development throwing them out from employment; and (3) in
a proper case the Court as sentinel on the qui vive is required to direct the appropriate authority to submit a
report and if the finding is that the workmen were engaged in violation of the provisions of the Act or were
continued as contract labour despite prohibition of the contract labour under Section 10(1), the High Court
has a constitutional duty to enforce the law and grant them appropriate relief of absorption in the employment
of the principal employer. Justice Majumder, in his concurring judgment, put it on the ground that when on
the fulfillment of the requisite conditions, the contract labour is abolished under Section 10(1), the
intermediary contractor vanishes and along with him vanishes the term “principal employer” and once the
intermediary contractor goes the term “principal” also goes with it; out of the tripartite contractual scenario
only two parties remain, the beneficiaries of the abolition of the erstwhile contract labour system, i.e. the
workmen on the one hand the employer on the other, who is no longer their principal employer but necessarily
becomes a direct employer for erstwhile contract labourers. The learned Judge also held that in the provision
of Section 10 there is implicit legislative intent that on abolition of contract system, the erstwhile contract
workmen would become direct employees of the employer on whose establishment they were earlier working
and were enjoying all the regulatory facilities under Chapter V in that very establishment. In regard to the
judgment in Gujarat Electricity Board’s case (supra), to which he was a party, the learned Judge observed
that he wholly agreed with Justice Ramaswamy’s view that the scheme envisaged by Gujarat Electricity
Board’s case was not workable and to that extent the said judgment could not be given effect to.
97.
For reasons we have given above, with due respect to the learned Judges, we are unable to agree with
their reasoning and conclusions.
**************
**************
116.
…………….
The upshot of the above discussion is outlined thus:
(1)…………..
(2)………….
(3)…………
(4)
We over-rule the judgment of this court in Air India’s case (supra) prospectively and declare that any
direction issued by any industrial adjudicator/any court including High Court, for absorption of contract
labour following the judgment of in Air India’s case (supra), shall hold good and that the same shall not be set
¹Hkkx IIµ[k.M 3(ii)º
Hkkjr dk jkti=k % vxLr 11] [email protected] 20] 1940
5151
aside, altered or modified on the basis of this judgment in cases where such a direction has been given effect
to and it has become final.”
28.
Thus from the above decision of Hon’ble the Apex Court it is explicitly clear that there is no automatic absorption
of the concerned workmen in the establishment, if the contractor has employed labours in violation of provisions of the
Act of 1970 and they cannot claim that they are direct employees of the company.
29.
Exhibits. W-01 to W-09 clearly show that the workman S/Shri Pankaj Kar and Gopinath Ghosh were engaged by
the contractor for the work of the Company. However, there is nothing in these exhibits to show that the salary had been
paid to these workmen directly by the Company. There is nothing on record also to show that they were engaged by the
Company directly. Consequently, they were workmen of the contractor and they have no relationship of employer and
employee with the Company. Ext. W-09, copy of which has also been filed by the Company which has been marked as
Ext. M-02 shows that Shri Sunil Kumar Pramanik was engaged by the Company directly, but the case of the Company is
that he was engaged for the job of electrical repairs and the same was not of perennial nature. Payment was also made
job-wise. In this context it would be proper to refer to Hon’ble the Apex Court’s decision in General Manager, Bengal
Nagpur Cotton Mills, Rajnandgaon v. Bharat Lal & Ors., JT 2010 (13) SC 729 where Hon’ble the Apex Court after
considering various pronouncements has held
“8.
……… Two of the well settled recognized tests to find out whether the contract labours are the direct
employees of the principal employer are (i) Whether the principal employer pays the salary instead of the
Contractor and (ii) whether the principal employer controls and supervises the work of the employees………”
30.
Thus from the above decision of Hon’ble the Apex Court it is abundantly clear that payment of salary to the
persons concerned and control and supervision of work by the employer are the two important factors to be taken into
consideration while deciding the relationship of employer and employee.
31.
Learned counsel for the union has cited several case laws in his submission to show that the contract in the instant
case was a sham contract and in absence of the same, relationship of employer and employee is established. He has relied
on Steal Authority of India Ltd. v. Workmen of Steal Authority of India Ltd., 2017 Lab.I.C. 1467. In this case workman
was initially engaged as contract worker by ex-contractor of the Company. He had been under direct control of the
management of the Company and worked more than couple of decades in different departments connected with process
of production of the Company. The facts of above cited case are different from that of instant case. There is nothing on
record to show that the workmen were under direct control of the Company or they worked in different departments of
the Company. There is nothing on record to show that the concerned workmen worked in the establishment of company.
Facts of Bharat Heavy Electricals v. State of U.P., AIR 2003 SC 3024 cited by the learned counsel for the union
are also different. Gardeners were engaged through contractor for looking after lawns and park inside factory premises,
campus. Their work was supervised by the employees of the Company, attendance was also recorded by another
employee of the Company. Thus, applying the control test, Hon’ble the Apex Court held them to be employees of the
Company. This is not so in the instant case. The control part of the concerned workmen by company is missing.
Another case cited by the learned counsel is West Bengal Power Development Corporation Ltd. & Ors. v. Asish
Dey Chowdhury decided by Hon’ble Calcutta High Court which has been set aside by Honble the Apex Court in Civil
Appeal No. 2863 of 2006 vide order dated 21st April, 2010. Hence it requires no discussion.
In Hussainbhai, Calicut v. Alath Factory Thozhilali Union, Calicut & Ors, 1978-II-LLJ 397 Hon’ble the Apex
Court has held “The true test may, with brevity, be indicated once again. Where a worker or group of workers labours to
produce goods or services and these goods or services are for the business of another, that other is, in fact, the employer.
He has economic control over the workers’ subsistence, skill, and continued employment………” Facts of the present
case are entirely different. In the instant case the workmen concerned were engaged for electrical maintenance, repairs
etc and that too through a contractor having no perennial nature of job.
Other cases cited by the learned counsel for the union, Shining Tailors v. Industrial Tribunal, U.P., 1983-II-LLJ
413 also spoke of supervision and control test. In Silver Jubilee Tailoring House & Ors. v. Chief Inspector of Shops and
Establishments & Ors., 1973-II-LLJ 495 the relationship of employer and employee was discussed with regard to
definition of person employed under Section 2(14) of Andhra Pradesh Shops and Establishments Act, 1951 which is not
applicable in the present case. In KCP Employees’ Association, Madras v. Management of KCP Ltd., Madras & Ors.,
1978-I-LLJ 322 Hon’ble Supreme Court has held that where any reasonable doubt on law and facts, the benefit must go
to the weaker section, labour. No reasonable doubt can be said to have arise in the instant case.
32.
Now again coming to the principles propounded by Hon’ble the Apex Court in Balwant Rai Saluja v. Air India
(supra) the relationship of employer and employee which is pure question of fact can be decided only after taking into
consideration the facts as to who is appointing authority, who pays salary, exercises control and supervision over the
workmen and who is authority to take disciplinary action against these persons. Applying these tests in the present case,
5152
THE GAZETTE OF INDIA : AUGUST 11, 2018/SRAVANA 20, 1940
[PART II—SEC. 3(ii)]
the National Insurance Company Ltd. was neither appointing authority, nor was having control and supervision over the
persons concerned. Salary also not paid by the company. Moreover, the union has asserted the relationship of employer
and employee, burden of proof lies on it to prove the same. But, I have no hesitation to say that the union/workmen
concerned have miserably failed to adduce evidence in this regard. They have also failed to prove that the workmen
concerned ever enjoyed any benefit available to other regular employees of the company. Thus, all the basic ingredients
of employer and employee relationship are absent in the instant case.
33.
In view of foregoing discussion, I come to the conclusion that the reference is bad in eye of law, as the union who
has espoused the cause of the concerned workmen does not have locus standi and there is no relationship of employer
and employee between company and the concerned workmen. Consequently prayer for absorption in service is also not
sustainable in law and concerned workmen are not entitled for any relief.
Award is passed accordingly.
Dated, Kolkata,
The 26th July, 2018.
JUSTICE RAVINDRA NATH MISHRA, Presiding Officer
Uploaded by Dte. of Printing at Government of India Press, Ring Road, Mayapuri, New Delhi-110064
and Published by the Controller of Publications, Delhi-110054.
ALOK
KUMAR
Digitally signed
by ALOK KUMAR
Date: 2018.09.08
10:29:47 +05'30'