28 GI/2021

(53)

रजिस्ट्री सं. डी.एल. (एन) 04/0007/2003—05

REGD. NO. D. L. (N) 04/0007/2003—05

xxxGIDHxxx

xxxGIDExxx

प्राजिकार से प्रकाजित

PUBLISHED BY AUTHORITY

साप् ताजिक

WEEKLY

सं. 02]

नई दिल् ली, िनवरी 10—िनवरी 16, 2021 िजनवार/ पौष 20— पौष 26, 1942

No. 02] NEW DELHI, JANUARY 10 – JANUARY 16, 2021, SATURDAY/PAUSHA 20–PAUSHA 26, 1942

इस भाग में जभन् न पष्‍ सं्‍ ा िी िाती िज जिससे दक ि पष क संकलन के प प में र ा िा सके

Separate Paging is given to this Part in order that it may be filed as a separate compilation

भाग II— ण् ड 3—उप- ण् ड (ii)

PART II—Section 3—Sub-section (ii)

भारत सरकार के मंत्राल ों (रक्षा मंत्राल को छोड़कर) द्वारा िारी दकए गए सांजवजिक आिेि और अजिसूचनाएं

Statutory Orders and Notifications Issued by the Ministries of the Government of India

(Other than the Ministry of Defence)

जवत्त मंत्राल

(जवत्ती सेवाएं जवभाग)

नई दिल् ली, 6 िनवरी, 2021

का. आ. 23.—जवत्ती आजस्ट्त ों का प्रजतभूजतकरण एवं पुनगग न त ा प्रजतभूजत जित का प्रवतगन अजिजन म,

2002 की िारा 21(1) द्वारा प्रित्त िजि ों का प्र ोग करते हुए, केन्री सरकार, एतद्द्वारा, बैंक आफ मिाराष्ट्र के

मिाप्रबंिक श्री प्रमोि आर. ितार को का गभार ग्रिण करने की तारी से 3 वषग की अवजि के जलए ा अपने

का ागल में सेवा-जनवषजत्त की आ ु प्राप्त िोने से 15 दिन पिले की तारी तक अ वा अगले आिेिों तक, िो भी पिले

िो, केन्री प्रजतभूजतकरण आजस्ट्त पुनगग न और प्रजतभूजत जित रजिस्ट्री, भारत (सीईआरएसएआई) के केन्री

पंिी क, प्रबंि जनिेिक त ा मु्‍ का गपालक अजिकारी के पि पर जन ुि करती िज।

[फा. सं. 30/01/2019-डीआरटी]

संि कुमार, उप सजचव

सी.जी.-डी.एल.-सा.-21012021-224609

CG-DL-W-21012021-224609

54 THE GAZETTE OF INDIA : JANUARY 16, 2021/PAUSHA 26, 1942

[PART II—SEC. 3(ii)]

MINISTRY OF FINANCE

(Department of Financial Services)

New Delhi, the 6th January, 2021

S.O. 23.—In exercise of powers conferred under Section 21(1) of the Securitisation and

Reconstruction of Financial Assets and Enforcement of Security Interest Act, 2002, the Central Government

hereby appoints Shri Pramod R. Datar, General Manager, Bank of Maharashtra to the post of Central Registrar,

Managing Director & Chief Executive Officer in the Central Registry of Securitisation Asset Reconstruction

and Security Interest of India (CERSAI) for a period of 03 years with effect from the date of assumption of

charge of the post, or till he attains the age of 60 years, or until further orders, whichever is the earliest.

[F. No. 30/01/2019-DRT]

SANJAY KUMAR, Dy. Secy.

जविेि मंत्राल

(सी.पी.वी. प्रभाग)

नई दि ल् ली, 29 दिसम् बर, 2020

का.आ. 24.—रािनज क और कोंसुली अजिकारी (िप एवं फीस) के अजिजन म, 1948 की िारा 2 के

ंड (क) के अनुसरण में वजिाजनक आिेि ।

एतद्द्वारा, केंर सरकार भारत के िूतावास, कुवजत में श्री रािेि चौिरी, सिा क अनुभाग अजिकारी को

दिनांक 29 दिसंबर 2020 से सिा क कोंसुलर अजिकारी के तौर पर कोंसुलर सेवाओं के जनवगिन के जलए प्राजिकषत

करती िज ।

[फा. सं. टी-4330/01/2019]

जव्‍णु कुमार िमाग, जनिेिक (सी.पी.वी.)

MINISTRY OF EXTERNAL AFFAIRS

(CPV DIVISION)

New Delhi, the 29th December 2020

S.O. 24.—Statutory Order in pursuance of the clause (a) of the Section 2 of the Diplomatic and

Consular Officers (Oaths and fees) Act, 1948 (41 of 1948), the Central Government hereby authorizes

Shri Rajesh Choudhary, Assistant Section Officer in Embassy of India, Kuwait to perform the Consular services

as Assistant Consular Officer with effect from 29.12.2020.

[F. No. T-4330/01/2019]

VISHNU KUMAR SHARMA, Director (CPV)

नई दि ल् ली, 29 दिसम् बर, 2020

का.आ. 25.—रािनज क और कोंसुली अजिकारी (िप एवं फीस) के अजिजन म, 1948 (1948 का 41)

की िारा 2 के ंड (क) के अनुसरण में वजिाजनक आिेि ।

एतद्द्वारा, केंर सरकार भारत के उच्चा ोग, िार-ए-सलाम में श्री िेवेन्र कुमार सिा क अनुभाग अजिकारी

को दिनांक 29 दिसंबर 2020 से सिा क कोंसुलर अजिकारी के तौर पर कोंसुलर सेवाओं के जनवगिन के जलए

प्राजिकषत करती िज।

[फा. सं. टी-4330/06/2018]

जव्‍णु कुमार िमाग, जनिेिक (सी.पी.वी.)

[भाग II— ण् ड 3(ii)]

भारत का रािपत्र : िनवरी 16, 2021/पौष 26, 1942

55

New Delhi, the 29th December, 2020

S.O. 25.—Statutory Order in pursuance of the clause (a) of the Section 2 of the Diplomatic and

Consular Officers (Oaths and fees) Act, 1948 (41 of 1948), the Central Government hereby appoints Shri

Devender Kumar, Assistant Section Officer as Assistant Consular Officer in High Commission of India, Dar-es-

Salaam to perform the Consular services with effect from 29 December 2020.

[F. No.T-4330/06/2018]

VISHNU KUMAR SHARMA, Director (CPV)

नई दि ल् ली, 30 दिसम् बर, 2020

का.आ. 26.—रािनज क और कोंसुली अजिकारी (िप एवं फीस) के अजिजन म, 1948 (1948 का 41)

की िारा 2 के ंड (क) के अनुसरण में वजिाजनक आिेि ।

एतद्द्वारा, केंर सरकार भारत के िूतावास,अबु िाबी में श्री जवि कुमार वमाग, सिा क अनुभाग अजिकारी

को दिनांक 30 दिसंबर 2020 से सिा क कोंसुलर अजिकारी के तौर पर कोंसुलर सेवाओं के जनवगिन के जलए

प्राजिकषत करती िज।

[फा.सं. टी-4330/01/2015]

जव्‍णु कुमार िमाग, जनिेिक (सीपीवी)

New Delhi, the 30th December, 2020

S.O. 26.—Statutory Order in pursuance of the clause (a) of the Section 2 of the Diplomatic and

Consular Officers (Oaths and fees) Act, 1948 (41 of 1948), the Central Government hereby authorizes Shri

Vijay Kumar Verma, Assistant Section Officer in Embassy of India, Abu Dhabi as Assistant Consular Officer to

perform the consular services with effect from 30 December 2020.

[F. No.T-4330/01/2015]

VISHNU KUMAR SHARMA, Director (CPV)

नई दि ल् ली, 4 िनवरी, 2021

का.आ. 27.—रािनज क और कोंसुली अजिकारी (िप एवं फीस) के अजिजन म, 1948 (1948 का 41)

की िारा 2 के ंड (क) के अनुसरण में वजिाजनक आिेि ।

एतद्द्वारा, केंर सरकार भारत के प्रिान कोंसलावास सैंट-डेजनस में श्री कीर्तग प्रभाकर आ ग, सिा क अनुभाग

अजिकारी को दिनांक 04 िनवरी 2021 से सिा क कोंसुलर अजिकारी के तौर पर कोंसुलर सेवाओं के जनवगिन के

जलए प्राजिकषत करती िज।

[फा. सं. टी-4330/01/2015]

जव्‍णु कुमार िमाग, जनिेिक (सीपीवी)

New Delhi, the 4th January, 2021

S.O. 27.—Statutory Order in pursuance of the clause (a) of the Section 2 of the Diplomatic and

Consular Officers (Oaths and fees) Act, 1948 (41 of 1948), the Central Government hereby authorizes Shri Kirti

Prabhakar Arya, Assistant Section Officer in Consulate General of India Saint Denis, as Assistant Consular

Officer to perform the consular services with effect from 04 January, 2021.

[F. No.T-4330/01/2015]

VISHNU KUMAR SHARMA, Director (CPV)

56 THE GAZETTE OF INDIA : JANUARY 16, 2021/PAUSHA 26, 1942

[PART II—SEC. 3(ii)]

कार्मगक, लोक जिका त त ा पेंिन मंत्राल

(कार्मगक और प्रजिक्षण जवभाग)

नई दि ल् ली, 14 िनवरी, 2021

का.आ. 28.—केन् र सरकार, एति द्वारा दिल् ली जविेष पुजलस स्ट् ापना अजिजन म, 1946 (1946 का 25)

की िारा 5 की उप-िारा (1) सपठ त िारा 6 द्वारा प्रित्त िजि ों का प्र ोग करते हुए गोवा राज् सरकार (का ोत्तर

प्रभाव से दिनांक 14.10.2020 से) के गोवा गषि (सामान् ) सजचवाल , पोवोठरम-गोवा की अजिसूचना

सं. 30/01/2015-सीबीआई/एचडी(िी)/2897, दिनांक 18.12.2020 के माध् म से िारी सिमजत से, सूचना

प्रौद्योजगकी अजिजन म, 2000 (2000 का 21) की िारा 67-बी और लैंजगक अपरािों से बालकों का संरक्षण

अजिजन म, 2012 (2012 का 32) की िारा 12 के तित दिनांक 14.10.2020 को ििग सीबीआई मामला

सं. आरसी-9(एस)/2020/सीबीआई/एससी-III/एनडी से संबंजित अपराि(िों) का अन्वेषण त ा ऐसे अपराि(िों) से

िुड़े ा उससे संबद्ध दकसी िु्‍प्र ास, िु्‍प्रेरणा और/अ वा षड्यंत्र एवं/अ वा उसी संव्यविार में दकए गए ा उन्िीं

तथ् ों से उत्पन्न दकसी अन् अपराि का अन्वेषण करने के जलए दिल्ली जविेष पुजलस स्ट् ापना (दिनांक 14.10.2020

से का ोत्तर प्रभाव से) के सिस्ट् ों की िजि ों और क्षेत्राजिकार का जवस्ट्तार समस्ट्त गोवा राज् में करती िज।

[फा. सं. 228/39/2020-एवीडी-II]

एस.पी.आर. जत्रपा ी, अवर सजचव

MINISTRY OF PERSONNEL, PUBLIC GRIEVANCES AND PENSIONS

(Department of Personnel and Training)

New Delhi, the 14th January, 2021

S. O. 28.—In exercise of the powers conferred by sub-section (1) of section 5 read with section 6 of the

Delhi Special Police Establishment Act, 1946 (25 of 1946), the Central Government with the consent of the

State Government of Goa (ex-post facto w.e.f. 14.10.2020), issued vide Notification No. 30/01/2015-

CBI/HD(G)/2897 dated 18.12.2020 of Goa Home (General) Secretariat, Porvorim – Goa, hereby extends the

powers and jurisdiction of the members of the Delhi Special Police Establishment (ex-post facto w.e.f.

14.10.2020) to the whole State of Goa for investigation into the offence(s) relating to CBI Case RC-

9(S)/2020/CBI/SC-III/ND registered on 14.10.2020, under section 67-B of Information Technology Act, 2000

(21 of 2000) and Section 12 of Protection of Children from Sexual Offences Act, 2012 (32 of 2012) and any

attempt, abetment and/or conspiracy, in relation to or in connection with such offence(s) and/or for any other

offence committed in the course of the same transaction or arising out of the same facts.

[F. No. 228/39/2020-AVD-II]

S. P. R. TRIPATHI, Under Secy.

नई दि ल् ली, 14 िनवरी, 2021

का.आ. 29.—केन् र सरकार, एतिद्वारा दिल् ली जविेष पुजलस स्ट् ापना अजिजन म, 1946 (1946 का 25)

की िारा 5 की उप-िारा (1) सपठ त िारा 6 द्वारा प्रित्त िजि ों का प्र ोग करते हुए छत्तीसगढ़ सरकार, गषि

जवभाग (सी-अनुभाग), मिानिी भवन, मंत्राल , नवा रा पुर, अटल नगर, रा पुर की अजिसूचना सं. एफ-4-7/गषि-

सी/2020 दिनांक 28 नवंबर, 2020 के माध् म से िारी छत्तीसगढ़ राज् सरकार की सिमजत से, लारा सुपर मगल

पॉवर प्लांट (एलएसटीपीपी), एनटीपीसी जलजमटेड, गांव–लारा, जिला रा गढ़ (छ.ग.) में 1,00,55,576 /- रु.

(लगभग) मूल् की स्ट्टील और सीमेंट मिों की कमी/िुर्वगजन ोिन के संबंि में श्री बी.पी.जबस्ट्वाल, पूवग एिीएम एवं

[भाग II— ण् ड 3(ii)]

भारत का रािपत्र : िनवरी 16, 2021/पौष 26, 1942

57

जवभागाध् क्ष; श्री बी.एन.प्रसाि, पूवग डीिीएम; श्री एस.एन.मंडल, डीिीएम; श्री एम.के.जमश्रा, सिा क प्रबंिक;

श्री आर.के.साहू, अजभ ंता; श्री कनक सािा, कजनष्ठ अजभ ंता; श्री िषगविगन मठ ा, कजनष्ठ अजभ ंता; श्री सुिीर

पुरोजित, कजनष्ठ अजभ ंता, श्री एल.पी.रात्रे, कजनष्ठ अजभ ंता, अनुबंि और सामग्री-भंडार (सीएंडएम स्ट्टोसग) जवभाग,

एलएसटीपीपी, एनटीपीसी जलजमटेड, गांव–लारा, जिला रा गढ़ (छ.ग.) एवं अन् अज्ञात लोक सेवकों/गजर-सरकारी

व्यजि ों के ज लाफ मिाप्रबंिक (सतकगता), नेिनल मगल पावर कॉपोरेिन (एनटीपीसी) जलजमटेड, मु्‍ ाल , नई

दिल्ली द्वारा संिभग सं्‍ ा 01/जवजि/लारा/1658 दिनांक 29.11.2019 के अंतगगत ििग कराई गई भारती िंड

संजिता (1860 का 45) एवं भ्रष्टाचार जनवारण अजिजन म, 1988 (1988 का 49) के तित िंडनी जिका त के

कारण उत्पन्न अपराि(िों) के अन्वेषण और ऐसे अपराि(िों) से िुड़े ा संबद्ध दकसी िु्‍प्र ास, िु्‍प्रेरणा और/अ वा

षड्यंत्र एवं/अ वा उसी संव्यविार में दकए गए ा उन्िीं तथ् ों से उत्पन्न दकसी अन् अपराि का अन्वेषण करने के

जलए दिल्ली जविेष पुजलस स्ट् ापना के सिस्ट् ों की िजि ों और क्षेत्राजिकार का जवस्ट्तार समस्ट्त छत्तीसगढ़ राज् में

करती िज।

[फा. सं. 228/01/2021-एवीडी-II]

एस.पी.आर. जत्रपा ी, अवर सजचव

New Delhi, the 14th January, 2021

S. O. 29.—In exercise of the powers conferred by sub-section (1) of section 5 read with section 6 of the

Delhi Special Police Establishment Act, 1946 (25 of 1946), the Central Government with the consent of the

State Government of Chhattisgarh, issued vide Notification No. F-4-7/Home-c/2020 dated 28 November, 2020

of Government of Chhattisgarh, Home Department (C-Section), Mahanadi Bhavan, Mantralaya, Nava Raipur,

Atal Nagar, Raipur, hereby extends the powers and jurisdiction of the members of the Delhi Special Police

Establishment to the whole State of Chhattisgarh for investigation into the offence(s) arising out of the

complaint lodged by General Manager (Vigilance), National Thermal Power Corporation (NTPC) Ltd., Head

Office, New Delhi vide Ref. No. 01/Vig/Lara/1658 dated 29.11.2019 pertaining to shortage/misappropriation of

Steel and Cement items worth Rs. 1,00,55,576 /- (approx.) at Lara Super Thermal Power Plant (LSTPP), NTPC

Ltd., Village – Lara, District Raigarh (C.G.) against Shri B.P. Biswal, Ex-AGM & HoD; Shri B.N. Prasad, EX-

DGM; Shri S.N. Mandal, DGM; Shri M.K. Mishra, Asstt. Manager; Shri R.K. Sahu, Engineer; Shri Kanak

Saha, Jr. Engineer; Shri Harshvardhan Mathia, Jr. Engineer; Shri Sudhir Purohit, Jr. Engineer; Shri L.P. Ratre,

Jr. Engineer, Contract & Materials-Stores (C&M-Stores) Department, LSTPP, NTPC Ltd., Village-Lara,

District Raigarh (C.G.) and other unknown Public Servants/Private Persons, punishable under the Indian Penal

Code (45 of 1860) and Prevention of Corruption Act, 1988 (49 of 1988) and any attempt, abetment and/or

conspiracy, in relation to or in connection with such offence(s) and/or for any other offence committed in the

course of the same transaction or arising out of the same facts.

[F. No. 228/01/2021-AVD-II]

S.P.R. TRIPATHI, Under Secy.

वाजणज् एवं उद्योग मंत्राल

(वाजणज् जवभाग)

नई दि ल् ली, 8 िनवरी, 2021

का.आ. 30.—केन्री सरकार, जन ागत (गुणवत्ता जन ंत्रण एंव जनरीक्षण) अजिजन म, 1963 (1963 का

22) की िारा 7 की उपिारा (1) के सा पठ त जन ागत (गुणवत्ता जन ंत्रण एंव जनरीक्षण) जन म, 1964 के जन म

12, के उपजन म (2) द्वारा प्रित्त िजि ों का प्र ोग करते हुए, मजससग जमनरल्स लजब सर्वगसेि प्राइवेट जलजमटेड, िंकर

58 THE GAZETTE OF INDIA : JANUARY 16, 2021/PAUSHA 26, 1942

[PART II—SEC. 3(ii)]

प फ रीटमेंट्स, प्र म मंजिल, प्लॉट न. 66, सजक्टर – ए, िोन – डी, मंचेस्ट्वर इंडजस्ट्र ल इस्ट्टेट, भुवनेश्र्वर -

751010 (जिसे एतद्पश्चात उि अजभकरण माना िाएगा) को इस अजिसूचना के िासकी रािपत्र में प्रकािन की

तारी से तीन वषग की अवजि के जलए, वाजणज् मंत्राल की िासकी रािपत्र में प्रकाजित भारत सरकार की

अजिसूचना के सा अनुसूची में जनर्िग्‍ ट दिनांक 20 दिसम्बर, 1965 की अजिसूचना की सं्‍ ा का.आ. 3975 के

तित प्रकाजित अजिसूचना में उपाबद्ध अनुसूची में जवजनर्िगष्ट जनि और अ स्ट्क समूि-। अ ागत लौि अ स्ट्क के

जन ागत से पूवग जनम्नजलज त ितों के अिीन पारािीप पत्तन, गोपालपुर पत्तन और िामरा पत्तन में उक् त जनि एवं

अ स्ट् क के जनरीक्षण करने के जलए एक अजभकरण के प प में मान् ता िेती िज, अ ागत् :

(i)

ि अजभकरण, जनि और अ स्ट्क समूि-I के जन ागत (जनरीक्षण) जन म, 1965 जन म 4 के अिीन

जनरीक्षण की पद्धजत की िााँच करने के जल े जन ागत जनरीक्षण पठरषि् द्वारा जनजमत्त नामजनर्िगष्ट

अजिकाठर ों को प ागप्त सुजविाएं िेगी; और

(ii) ि अजभकरण, इस अजिसूचना में ा जवजनर्िग्‍ ट अपने का ों का जन्‍ पािन करने के जलए, जनिेिक

(जनरीक्षण और गुणवत्ता जन ंत्रण) जन ागत जनरीक्षण पठरषि द्वारा सम -सम पर, जलज त प प में,

दिए गए जनिेिों से आबद्ध िोंगी ।

[फा. सं. के-16014/1/2021-जन ागत जनरीक्षण]

दिवाकर ना जमसरा, सं ुि सजचव

MINISTRY OF COMMERCE AND INDUSTRY

(Department of Commerce)

New Delhi, the 8th January, 2021

S. O. 30.—In exercise of the powers conferred by the sub-section (1) of section 7 of the Export

(Quality Control and Inspection) Act, 1963 (22 of 1963) read with sub-rule (2) of rule 12 of the Export (Quality

Control and Inspection) Rules, 1964, the Central Government hereby recognises M/s. Minerals Lab Services

Private Limited, C/o Shankar Roof Treatments, 1st Floor, Plot no. 66, Sector-A, Zone-D, Mancheswar Industrial

Estate, Bhubaneswar- 751010, (hereinafter referred to as the said agency), as an agency for a period of three

years from the date of publication of this notification, for the inspection of Minerals and Ores - Group-I, namely,

Iron Ore specified in the Schedule annexed to the notification of the Government of India in the Ministry of

Commerce published in the official Gazette vide number S.O. 3975, dated the 20th December, 1965, prior to

export of the said Mineral and Ore at Paradip Port, Gopalpur Port and Dhamra Port subject to the following

conditions, namely:-

(i)

the said agency shall give adequate facilities to the officers nominated by the Export Inspection

Council in this behalf to examine the method of inspection followed by them in carrying out the

inspection specified under rule 4 of the Export of Minerals and Ores - Group I (Inspection) Rules,

1965; and

(ii)

the said agency in performance of its function as specified in this notification shall be bound by

such directions as the Director (Inspection and Quality Control), Export Inspection Council may

give, in writing, from time to time.

[F. No. K-16014/1/2021-Export Inspection]

DIWAKAR NATH MISRA, Jt. Secy.

[भाग II— ण् ड 3(ii)]

भारत का रािपत्र : िनवरी 16, 2021/पौष 26, 1942

59

को ला मंत्राल

नई दिल्ली, 11 िनवरी, 2021

का.आ. 31.—केन् री सरकार, को ला िारक क्षेत्र (अिगन और जवकास) अजिजन म, 1957 (1957 का 20)

(जिसे इसमें इसके पश् चात् उक् त अजिजन म किा ग ा िज) की िारा 4 की उपिारा (1) के अिीन भारत सरकार ने

को ला मंत्राल द्वारा िारी की गई अजिसूचना सं्‍ ांक का. आ. 474, तारी 30 िून, 2020, िो भारत के

रािपत्र के भाग II, ण् ड 3, उप ण् ड (ii), तारी 4 िुलाई, 2020 में प्रकाजित की गई ी, इस अजिसूचना से

उपाबद्ध अनुसूची में जवजनर्िग्‍ ट पठरक्षेत्र की भूजम में जिसका माप 62.03 िेक् टर (लगभग) ा 153.28 एकड़

(लगभग) िज, को ले का पूवेक्षण करने के अपने आि की सूचना िी ी;

और केन् री सरकार का ि समािान िो ग ा िज दक इस अजिसूचना से संलग् न अनुसूची में जवजित उक् त

भूजम के भाग में को ला अजभप्राप् त िज;

अत:, अब, केन् री सरकार उक् त अजिजन म की िारा 7 की उप-िारा (1) द्वारा प्रित् त िजक् त ों का प्र ोग

करते हुए, इससे संलग् न अनुसूची में वर्णिंत 61.89 िेक् टर (लगभग) ा 152.93 एकड़ (लगभग) माप वाली भूजम में

ा उस पर के सभी अजिकार का अिगन करने के अपने आि की सूचना िेती िज:

ठटप् पण 1: इस अजिसूचना के अिीन आने वाले क्षेत्र के रे ांक सं्‍ ांक सी-I (ई) III/ एफआर/1120-965, तारी

13 नवम् बर, 2020 का जनठरक्षण कलेक् टर, जिला नागपुर (मिारा्‍ र) के का ागल में ा को ला जन ंत्रक, 1,

काउंजसल िाउस स्ट् रीट, कोलकाता- 700 001 के का ागल में ा जवभागाध् क्ष अ वा मु्‍ प्रबंिक, वेस्ट् टनग

कोलफील् ्स जलजमटेड (रािस्ट् व जवभाग), कोल इस्ट् टेट, जसजवल लाईन् स, नागपुर, (मिारा्‍ र) - 440 001 के का ागल

में दक ा िा सकता िज ।

ठटप् पण 2 : उक् त अजिजन म की उपिारा 8 के उपबंिों की ओर ध् ान आकष्‍ ट दक ा िाता िज, जिसमें जनम् नजलज त

उपबंि िज :-

‘‘8. अिगन के संबंि में आपजत्त ां.- (1) कोई व् जक् त िो दकसी भूजम में, जिसके संबंि में िारा 7 के अिीन

अजिसूचना जनकाली गई िज, जितबद्ध िज, अजिसूचना के िारी दकए िाने से तीस दिन के भीतर सम् पूणग भूजम ा उसके

दकसी भाग ा ऐसी भूजम में ा उस पर के दकन् िीं अजिकारों का अिगन दकए िाने के बारे में आपजत् त कर सकेगा ।

स्ट् प्‍ टीकरण.- इस िारा के अंतगगत ि आपजत् त निीं मानी िाएगी, दक कोई व् जक् त दकसी भूजम में को ला उत् पािन

के जलए स्ट् व ं नन संदि ाएं करना चािता िज और ऐसी संदि ाएं केन् री सरकार ा दकसी अन् व् जक् त को निीं

करनी चाजिए।

(2) उपिारा (1) के अिीन प्रत् ेक आपजत् त सक्षम प्राजिकारी को जलज त प प में की िाएगी और सक्षम

अजिकारी, आपजत् तकताग को स्ट् व ं सुने िाने ा जवजि व् वसा ी द्वारा सुनवाई का अवसर िेगा और ऐसी

सभी आपजत् त ों को सुनने के पश् चात् और ऐसी अजतठरक् त िांच, दि कोई िो, करने के पश् चात् िो वि

आवश् क समझता िज, वि ा तो िारा 7 की उपिारा (1) के अिीन अजिसूजचत भूजम के ा ऐसी भूजम में

ा उस पर के अजिकारों के संबंि में एक ठरपोटग ा ऐसी भूजम के जवजभन् न टुकड़ों ा ऐसी भूजम में ा उस

पर के अजिकारों के संबंि में आपजत् त ों पर अपनी जसफाठरिों और उसके द्वारा की गई का गवािी के

अजभले सजित जवजभन् न ठरपोटग केन् री सरकार को उसके जवजनश् च के जलए िेगा ।

(3) इस िारा के प्र ोिनों के जलए वि व् जक् त दकसी भूजम में जितबद्ध समझा िाएगा िो प्रजतकर में जित का

िावा करने का िकिार िो, दि भूजम ा दकसी ऐसी भूजम में ा उस पर के अजिकार इस अजिजन म के

अिीन अर्िगत कर जलए िाते िज ।

ठटप् पण 3: केन् री सरकार ने को ला जन ंत्रक 1, काउंजसल िाउस स्ट् रीट, कोलकाता - 700 001 को उक् त अजिजन म

की िारा 3 के अिीन अजिसूचना सं्‍ ा का. आ. 2519, तारी 27 मई, 1983, िो भारत के रािपत्र, भाग II, ंड

3, उप ंड (ii) में तारी 11 िून, 1983 में प्रकाजित की ग ी ी, द्वारा सक्षम प्राजिकारी जन ुक् त दक ा िज ।

60 THE GAZETTE OF INDIA : JANUARY 16, 2021/PAUSHA 26, 1942

[PART II—SEC. 3(ii)]

अनुसूची

अमल् गामेटेड इंिर-काम ी डीप ओपनकास्ट् ट माईन

नागपुर क्षेत्र

जिला नागपुर (मिारा्‍ र)

[ रे ांक सं्‍ ा सी-I (ई) III / एफआर/1120-965, तारी 13 नवम् बर, 2020 ]

सभी अजिकार :

ि.

सं.

ग्राम का

नाम

पटवारी

सर्कगल

सं्‍ ा

तिसील

जिला

क्षेत्रफल िेक् टर में

कुल

ठटप् पणी

जनिी

सरकारी

भाग

भाग 1

कांरी

15अ

पारजसवनी

नागपुर

9.53

5.36

0.00

14.89

भाग

भाग 2

कांरी

15अ

पारजसवनी

नागपुर

0.90

0.00

0.00

0.90

भाग

भाग 3

कांरी

15अ

पारजसवनी

नागपुर

7.68

0.56

0.00

8.24

भाग

भाग 4

टेकाडी

(गोंडेगांव)

14

पारजसवनी

नागपुर

1.46

0.00

0.00

1.46

भाग

भाग 5

टेकाडी

(गोंडेगांव)

14

पारजसवनी

नागपुर

17.22

1.85

0.00

19.07

भाग

भाग 6

टेकाडी

(गोंडेगांव)

14

पारजसवनी

नागपुर

0.71

0.05

0.00

0.76

भाग

भाग 7

टेकाडी

(गोंडेगांव)

14

पारजसवनी

नागपुर

1.57

0.00

0.00

1.57

भाग

भाग 8

टेकाडी

(गोंडेगांव)

14

पारजसवनी

नागपुर

0.40

0.00

0.00

0.40

भाग

भाग 9

टेकाडी

(गोंडेगांव)

14

पारजसवनी

नागपुर

0.01

0.00

0.00

0.01

भाग

भाग 10

टेकाडी

(गोंडेगांव)

14

पारजसवनी

नागपुर

0.00

2.02

0.00

2.02

भाग

भाग 11

टेकाडी

(गोंडेगांव)

14

पारजसवनी

नागपुर

12.17

0.00

0.00

12.17

भाग

भाग 12

टेकाडी

(गोंडेगांव)

14

पारजसवनी

नागपुर

0.40

0.00

0.00

0.40

भाग

कुल क्षेत्र : 61.89 िेक् टर (लगभग)

ा 152.93 एकड़ (लगभग)

अर्िगत दकए िाने वाले सीमा क्षेत्र के प् लाट सं्‍ ांक :

भाग 1

ग्राम कांरी के प् लाट सं्‍ ांक :

27, 28/1(भाग) - 28/2(भाग), 29(भाग), 32/1(भाग), 33/2(भाग), 33/1- 33/3, 40 (एमआईडीसी),

333(भाग) (एमआईडीसी), सरकारी भूजम (भाग).

[भाग II— ण् ड 3(ii)]

भारत का रािपत्र : िनवरी 16, 2021/पौष 26, 1942

61

भाग 2

ग्राम कांरी के प् लाट सं्‍ ांक :

32/2.

भाग 3

ग्राम कांरी के प् लाट सं्‍ ांक :

11/1अ (भाग) - 11/1ब (भाग), 13/1 (भाग), 317, 318/1- 318/2, 326/1, सरकारी भूजम (भाग).

भाग 4

ग्राम टेकाडी (गोंडेगांव) के प् लाट सं्‍ ांक :

593.

भाग 5

ग्राम टेकाडी (गोंडेगांव) के प् लाट सं्‍ ांक :

597 (भाग), 603/1/ए- 603/1/बी- 603/2ए- 603/2बी, 605/1- 605/2- 605/3, 606/1- 606/2, 607/1-

607/2-607/2ए, 609/1ए- 609/1बी, 609/2, 610/1ए- 610/1बी- 610/2- 610/3ए- 610/3बी- 610/4,

623/3, सरकारी भूजम (भाग).

भाग 6

ग्राम टेकाडी (गोंडेगांव) के प् लाट सं्‍ ांक :

588/1, सरकारी भूजम (भाग).

भाग 7

ग्राम टेकाडी (गोंडेगांव) के प् लाट सं्‍ ांक :

529, 532, 587(भाग).

भाग 8

ग्राम टेकाडी (गोंडेगांव) के प् लाट सं्‍ ांक :

538/1- 538/2- 538/3- 538/4- 538/5- 538/6- 538/7.

भाग 9

ग्राम टेकाडी (गोंडेगांव) के प् लाट सं्‍ ांक :

581.

भाग 10

ग्राम टेकाडी (गोंडेगांव) के प् लाट सं्‍ ांक :

493 ( एमआईडीसी) (भाग).

भाग 11

ग्राम टेकाडी (गोंडेगांव) के प् लाट सं्‍ ांक :

62 THE GAZETTE OF INDIA : JANUARY 16, 2021/PAUSHA 26, 1942

[PART II—SEC. 3(ii)]

625/1- 625/2, 626, 627/1-627/2- 627/3, 629, 630, 631, 632, 634/3, 635, 636/3ए/1- 636/3ए/2-

636/3बी.

भाग 12

ग्राम टेकाडी (गोंडेगांव) के प् लाट सं्‍ ांक :

624/2.

सीमा वणगन :

( भाग – 1 )

क – :

रे ा ग्राम टेकाडी एवं ग्राम कांरी की सजम् मजलत सीमा पर जस्ट् त जबन् िु 'क' से आरंभ िोकर िजक्षण-पूवग

दििा में नाले के िजक्षण तट से लगकर गुिरती िज और ग्राम कांरी में नाले के तट पर जस्ट् त जबन् िु ' '

पर जमलती िज ।

–ग–घ :

रे ा जबन् िु ‘ ’ से आरंभ िोकर िजक्षण दििा में प् लाट सं्‍ ांक 40, 33/1 की बाह्य सीमा से लगकर

गुिरती िज दफर जबन् िु ‘ग’ से िोकर िजक्षण दििा में गुिरती िज और सड़क के पजश् चम तट पर जस्ट् त

जबन् िु ‘घ’ पर जमलती िज ।

घ–ड.–क :

रे ा जबन् िु ‘घ’ से आरंभ िोकर पजश् चम दििा में प् लाट सं्‍ ा 27 की बाह्य सीमा से लगकर गुिरती िज

दफर जबन् िु ‘ड.’ से मुड़कर उत् तर-पूवग दििा में प् लाट सं्‍ ा 27 की पूवग सीमा से लगकर गुिरती िज

दफर प् लाट सं्‍ ा 333 से िोकर सड़क पार करती िज तत्पश्चात् उत् तर-पूवग दििा में ग्राम कांरी और

ग्राम टेकाडी की ग्राम सीमा से लगकर गुिरती िज और प्रारंजभक जबन् िु ‘क’ पर समाप् त िोती िज ।

(भाग – 2 )

च–छ-ि-च:

ि भाग ग्राम कांरी में एकमात्र प् लाट सं्‍ ा 32/2 को समाजव्‍ ट करता िज ।

( भाग – 3 )

झ – ञ :

रे ा ग्राम कांरी में जबन् िु ‘झ’ से आरंभ िोकर िजक्षण-पूवग दििा में प् लाट सं्‍ ांक 317, 318 की बाह्य

सीमा से लगकर गुिरती िज दफर सड़क पार कर प् लाट सं्‍ ा 12 की बाह्य सीमा से लगकर दफर प् लाट

सं्‍ ा 11/1 में से गुिरती िज दफर िजक्षण दििा में नाले के तट से लगकर गुिरती िज और जबन् िु ‘ञ’ पर

जमलती िज।

ञ - ट :

रे ा जबन् िु ‘ञ’ से आरंभ िोकर पजश् चम दििा में प् लाट सं्‍ ा 13/1 से गुिरती िज दफर सड़क पार कर

प् लाट सं्‍ ा 326/1 की बाह्य सीमा से लगकर गुिरती िज और ग्राम कांरी में जबन् िु ‘ट’ पर जमलती िज ।

ट – झ :

रे ा ग्राम कांरी में जबन् िु ‘ट’ से आरंभ िोकर उत् तर दििा में प् लाट सं्‍ ांक 326/1, 317 की पजश् चम

सीमा से लगकर गुिरती िज और सड़क पार कर जबन् िु ‘झ’ पर समाप् त िोती िज ।

( भाग – 4 )

-ड-ढ- : ि भाग ग्राम टेकाडी में एकमात्र प् लाट सं्‍ ा 593 को समाजव्‍ ट करता िज ।

( भाग – 5 )

ण - त :

रे ा ग्राम टेकाडी में जबन् िु ‘ण’ से आरंभ िोकर प् लाट सं्‍ ांक 610, 605 की बाह्य सीमा से लगकर

गुिरती िज दफर एम.एस.ई.बी. भूजम की बाह्य सीमा से लगकर गुिरती िज और जबन् िु ‘त’ पर जमलती

िज।

[भाग II— ण् ड 3(ii)]

भारत का रािपत्र : िनवरी 16, 2021/पौष 26, 1942

63

त – :

रे ा जबन् िु ‘त’ से आरंभ िोकर पजश् चम दििा में एम.एस.ई.बी. भूजम की बाह्य सीमा से लगकर

गुिरती िज तत्पश्चात् िजक्षण दििा में प् लाट सं्‍ ा 603 की बाह्य सीमा से लगकर गुिरती िज और

ग्राम टेकाडी में जबन् िु ‘ ’ पर जमलती िज ।

– ि

रे ा ग्राम टेकाडी में जबन् िु ‘ ’ से आरंभ िोकर प् लाट सं्‍ ांक 603, 606, 607 की बाह्य सीमा से

लगकर गुिरती िज और जबन् िु ‘ि’ पर जमलती िज।

ि - ि:

रे ा ग्राम टेकाडी में जबन् िु ‘ि’ से आरंभ िोकर प् लाट सं्‍ ा 607/1,607/2 की बाह्य सीमा से लगकर

गुिरती िज दफर उत् तर-पूवग दििा में प् लाट सं्‍ ांक 609/1ए, 609/1बी, 609/2 की बाह्य सीमा से

लगकर गुिरती िज और सड़क के पूवग तट पर जस्ट् त जबन् िु ‘ि’ पर जमलती िज ।

ि – न:

रे ा ग्राम टेकाडी में जबन् िु ‘ि’ से आरंभ िोकर िजक्षण दििा में सड़क के पूवी तट से लगकर गुिरती िज

दफर सड़क पार कर सड़क के पजश् चम तट पर जस्ट् त जबन् िु ‘न’ पर जमलती िज ।

न – प:

रे ा ग्राम टेकाडी में जबन् िु ‘न’ से आरंभ िोकर उत् तर दििा में सड़क के पजश् चम तट से लगकर गुिरती

िज और प् लाट सं्‍ ा 623/3 के जनकट सड़क के तट पर जस्ट् त जबन् िु ‘प’ पर जमलती िज।

प फ-ब-भ:

रे ा ग्राम टेकाडी में जबन् िु ‘प’ से आरंभ िोकर प् लाट सं्‍ ा 623/3 के िजक्षण सीमा से लगकर गुिरती

िज दफर जबन् िु ‘फ’ से मुड़कर उत् तर दििा में प् लाट सं्‍ ा 623/3 की पजश्चम सीमा से लगकर गुिरती

िज दफर जबन् िु ‘ब’ से पूवग दििा में मुड़कर प् लाट सं्‍ ा 623/3 की उत् तरी सीमा से लगकर गुिरती िज

और प् लाट सं्‍ ा 623/3 के उत् तरी-पूवग कोने पर जस्ट् त जबन् िु ‘भ’ पर जमलती िज ।

भ – ण :

रे ा ग्राम टेकाडी में जबन् िु ‘भ’ से आरंभ िोकर सड़क पार करती िज दफर िजक्षण दििा में सड़क के पूवी

तट से लगकर गुिरती िज और प् लाट सं्‍ ा 610 के जनकट सड़क के पूवी तट पर जस्ट् त प्रारंजभक जबन् िु

‘ण’ पर समाप् त िोती िज ।

( भाग – 6 )

म – -म :

ि भाग ग्राम टेकाडी में प् लाट सं्‍ ा 588/1, सरकारी भूजम के भाग को समाजव्‍ ट करता िज ।

( भाग – 7 )

क1 – 1 : रे ा ग्राम टेकाडी में जबन् िु ‘क1’ से आरंभ िोकर पूवग दििा में प् लाट सं्‍ ा 532 की उत् तरी सीमा से

लगकर गुिरती िज दफर िजक्षण-पूवग दििा में प् लाट सं्‍ ांक 529, 587 की बाह्य सीमा से लगकर

गुिरती िज और जबन् िु ‘ 1’ पर जमलती िज।

1 – क1 : रे ा जबन् िु ‘ 1’ से आरंभ िोकर प् लाट सं्‍ ा 587 में से िोकर पजश् चम दििा में प् लाट सं्‍ ा 532 की

बाह्य सीमा से लगकर गुिरती िज और आरंजभक जबन् िु ‘क1’ पर समाप् त िोती िज ।

( भाग – 8 )

ग1–घ1-ड.1-ग1 : ि भाग ग्राम टेकाडी में प् लाट सं्‍ ा 538 को समाजव्‍ ट करता िज ।

( भाग – 9 )

च1 :

ि भाग ग्राम टेकाडी में एकमात्र प् लाट सं्‍ ा 581 को समाजव्‍ ट करता िज ।

64 THE GAZETTE OF INDIA : JANUARY 16, 2021/PAUSHA 26, 1942

[PART II—SEC. 3(ii)]

( भाग – 10 )

छ1–ि1-झ1-

ञ1-छ1:

ि भाग ग्राम टेकाडी में एकमात्र प् लाट सं्‍ ा 493 का पजश् चमी भाग समाजव्‍ ट करता िज ।

( भाग – 11 )

ट1 – 1 : रे ा ग्राम टेकाडी में जबन् िु ‘ट1’ से आरंभ िोकर िजक्षण-पूवग दििा में प् लाट सं्‍ ांक 635, 634/3 की

उत् तरी सीमा से लगकर गुिरती िज और जबन् िु ‘ 1’ पर जमलती िज ।

1 – ड1 :

रे ा जबन् िु ‘ 1’ से आरंभ िोकर िजक्षण दििा में प् लाट सं्‍ ांक 634/3, 635, 632, की बाह्य सीमा

से लगकर गुिरती िज दफर उत् तर दििा में प् लाट सं्‍ ांक 626, 625 बाह्य सीमा से लगकर गुिरती िज

दफर िजक्षण दििा की बाह्य सीमा से लगकर गुिरती िज और जबन् िु ‘ड1’ पर जमलती िज ।

ड1 – ढ1 :

रे ा ग्राम टेकाडी में जबन् िु ‘ड1’ से आरंभ िोकर पजश् चम दििा में प् लाट सं्‍ ांक 625, 627 की

िजक्षण सीमा से लगकर गुिरती िज और जबन् िु ‘ढ1’ पर जमलती िज।

ढ1 – ण1 : रे ा जबन् िु ‘ढ1’ से आरंभ िोकर प् लाट सं्‍ ाक 627, 629, 636/3ब की बाह्य सीमा से लगकर

गुिरती िज दफर उत् तर दििा में ग्राम टेकाडी एवं ग्राम गोंडेगांव की सजम् मजलत ग्राम सीमा से लगकर

गुिरती िज और जबन् िु ‘ण1’ पर जमलती िज ।

ण1 – ट1 : रे ा जबन् िु ‘ण1’ से आरंभ िोकर पूवग दििा में प् लाट सं्‍ ांक 636/3अ/1, 636/3अ/2, 636/3/ब की

उत् तरी सीमा से लगकर गुिरती िज दफर उत् तर दििा में प् लाट सं्‍ ा 635 की पजश् चम सीमा से लगकर

गुिरती िज और आरंजभक जबन् िु ‘ट1’ पर जमलती िज ।

( भाग – 12 )

त1 :

ि भाग ग्राम टेकाडी में एकमात्र प् लाट सं्‍ ा 624/2 को समाजव्‍ ट करता िज।

[फा. सं. 43015/09/2020 एलए एण् ड आईआर]

राम जिरोमजण सरोि, उप सजचव

MINISTRY OF COAL

New Delhi, the 11th January, 2021

S. O. 31.—Whereas by the notification of the Government of India in the Ministry of Coal number

S. O. 474, dated the 30th June, 2020 issued under sub-section (1) of section 4 of the Coal Bearing Areas

(Acquisition and Development) Act, 1957 (20 of 1957) (hereinafter referred to as the said Act) and published in

the Gazette of India, Part II, Section 3, Sub-section (ii), dated the 4th July, 2020, the Central Government gave

notice of its intention to prospect for coal in 62.03 hectares (approximately) or 153.28 acres (approximately) of

the land in the locality specified in the Schedule annexed to that notification ;

And whereas the Central Government is satisfied that coal is obtainable in a part of the said lands

prescribed in the Schedule appended to this notification;

Now, therefore, in exercise of the powers conferred by sub-section (1) of section 7 of the said Act, the

Central Government hereby gives notice of its intention to acquire all rights in or over the said land measuring

61.89 hectares (approximately) or 152.93 acres (approximately) described in the Schedule appended hereto:

Note 1: The plan bearing number C-I(E)III/FR/1120-965, dated the 13th November, 2020 of the area covered by

this notification may be inspected in the office of the Collector, District Nagpur (Maharashtra) or in the office

of the Coal Controller, 1, Council House Street, Kolkata - 700 001 or in the office of the Head of Department or

Chief Manager, Western Coalfields Limited (Revenue Department), Coal Estate, Civil Lines, Nagpur,

(Maharashtra) – 440 001.

Note 2: Attention is hereby invited to the provisions of section 8 of the aforesaid Act which provides as

follows:-

[भाग II— ण् ड 3(ii)]

भारत का रािपत्र : िनवरी 16, 2021/पौष 26, 1942

65

“8. Objections to Acquisition .-(1) Any person interested in any land in respect of which a

notification under section 7 has been issued, may, within thirty days of the issue of the notification, object to the

acquisition of the whole or any part of the land or of any rights in or over such land.

Explanation:-It shall not be an objection within the meaning of this section for any person to say that he

himself desires to undertake mining operations in the land for the production of coal and that such operations

should not be undertaken by the Central Government or by any other person.

(2)

Every objection under sub-section (1) shall be made to the competent authority in writing and the

competent authority shall give the objector an opportunity of being heard either in person or by a

legal practitioner and shall, after hearing all such objections and after making such further

inquiry, if any, as he thinks necessary, either make a report in respect of the land which has been

notified under sub-section (1) of section 7 or of rights in or over such land, or make different

reports in respect of different parcels of such land or of rights in or over such land, to the Central

Government, containing his recommendations on the objections, together with the record of

proceedings held by him, for the decision of that Government.

(3)

For the purpose of this section, a person shall be deemed to be interested in land who would be

entitled to claim an interest in compensation if the land or any rights in or over such land were

acquired under this Act.”

Note 3: The Coal Controller, 1, Council House Street, Kolkata - 700 001 has been appointed by the Central

Government as the competent authority under section 3 of the said Act, vide notification number S.O. 2519,

dated the 27th May, 1983, published in the Gazette of India, Part II, Section 3, Sub-section (ii), dated the

11th June, 1983.

SCHEDULE

Amalgamated Inder-Kamptee Deep Opencast Mine

Nagpur Area

District Nagpur (Maharashtra)

[ Plan bearing number C-I(E)III/FR/1120-965, dated the 13th November, 2020 ]

All Rights:

Sl.

No.

Name of

Village

Patwari

Circle

number

Tahsil

District

Description of land

Total

Remarks

Tenancy Government Forest

Part I

Kandri

15A

Parseoni

Nagpur

9.53

5.36

0.00

14.89

Part

Part II

Kandri

15A

Parseoni

Nagpur

0.90

0.00

0.00

0.90

Part

Part III

Kandri

15A

Parseoni

Nagpur

7.68

0.56

0.00

8.24

Part

Part IV

Tekadi

(Gondegaon)

14

Parseoni

Nagpur

1.46

0.00

0.00

1.46

Part

Part V

Tekadi

(Gondegaon)

14

Parseoni

Nagpur

17.22

1.85

0.00

19.07

Part

Part VI

Tekadi

(Gondegaon)

14

Parseoni

Nagpur

0.71

0.05

0.00

0.76

Part

Part VII Tekadi

(Gondegaon)

14

Parseoni

Nagpur

1.57

0.00

0.00

1.57

Part

Part VIII Tekadi

(Gondegaon)

14

Parseoni

Nagpur

0.40

0.00

0.00

0.40

Part

Part IX

Tekadi

(Gondegaon)

14

Parseoni

Nagpur

0.01

0.00

0.00

0.01

Part

Part X

Tekadi

(Gondegaon)

14

Parseoni

Nagpur

0.00

2.02

0.00

2.02

Part

66 THE GAZETTE OF INDIA : JANUARY 16, 2021/PAUSHA 26, 1942

[PART II—SEC. 3(ii)]

Part XI

Tekadi

(Gondegaon)

14

Parseoni

Nagpur

12.17

0.00

0.00

12.17

Part

Part XII Tekadi

(Gondegaon)

14

Parseoni

Nagpur

0.40

0.00

0.00

0.40

Part

Total Area: 61.89 hectares (approximately)

or 152.93 acres (approximately)

Plot numbers to be acquired within acquisition of boundary:

Part I

Village Kandri : 27, 28/1(Part)- 28/2(Part), 29(Part), 32/1(Part), 33/2 (Part),33/1- 33/3, 40 (MIDC), 333(Part)

(MIDC), Government land (Part).

Part II

Village Kandri : 32/2

Part III

Village Kandri : 11/1A(Part)- 11/1B(Part), 13/1(Part), 317, 318/1- 318/2, 326/1, Government land (Part).

Part IV

Village Tekadi (Gondegaon) : 593.

Part V

Village Tekadi (Gondegaon) : 597(Part), 603/1/A- 603/1/B- 603/2A- 603/2B, 605/1- 605/2- 605/3, 606/1-

606/2, 607/1- 607/2- 607/2A, 609/1A- 609/1B, 609/2, 610/1A- 610/1B- 610/2- 610/3A- 610/3B- 610/4,

623/3,Government land (Part).

Part VI

Village Tekadi (Gondegaon) : 588/1, Government land (Part) .

Part VII

Village Tekadi (Gondegaon): 529, 532, 587(Part).

Part VIII

Village Tekadi (Gondegaon): 538/1- 538/2- 538/3- 538/4- 538/5- 538/6- 538/7.

Part IX

Village Tekadi (Gondegaon): 581.

Part X

Village Tekadi (Gondegaon): 493 (MIDC) (Part).

Part XI

Village Tekadi (Gondegaon): 625/1- 625/2, 626, 627/1-627/2- 627/3, 629, 630, 631, 632, 634/3, 635,

636/3A/1- 636/3A/2- 636/3B.

Part XII

Village Tekadi (Gondegaon) : 624/2.

Boundary description:

( PART – I )

A – B :

Line starts from point ‘A’ on common boundary of village Tekadi and Kandri, passes in south-

east direction along the south bank of Nallah in village Kandri and meets at point ‘B’ on the bank

of Nallah.

[भाग II— ण् ड 3(ii)]

भारत का रािपत्र : िनवरी 16, 2021/पौष 26, 1942

67

B – C – D :

Line starts from point ‘B’ passes in south direction along the outer boundary of plot numbers 40,

33/1, passes through point ‘C’ then passes in south direction and meets at point ‘D’ on the west

side of road in village Kandri.

D – E – A :

Line starts from point ‘D’, passes in west direction along the outer boundary of plot number 27,

turns through point ‘E’ and passes in north-east direction along the east boundary of plot number

27, then passes through plot number 333 crosses the road, then passes along the common

boundary of village Tekadi and Kandri in north-east direction and ends at starting point ‘A’.

( PART – II )

F–G–H-F :

Encompasses the single plot number 32/2 in village Kandri.

( PART – III )

I – J :

Line starts from point ‘I’ in village Kandri, passes in south-east direction along the outer

boundary of plot numbers 317, 318, crosses the road passes along the outer boundary of plot

number 12, passes through plot number 11/1, then passes in south direction along the bank of

Nallah and meets at point ‘J’.

J – K :

Line starts from point ‘J’ passes in west direction, then passes through plot number 13/1, crosses

the road passes along the outer boundary of plot number 326/1 and meets at point ‘K’ in village

Kandri.

K – I :

Line starts from point ‘K’ in village Kandri passes along the west boundary of plot numbers

326/1, 317 in north direction crosses the road and ends at starting point ‘I’ in village Kandri.

( PART – IV )

L–M–N–L :

Encompasses the single plot number 593 in village Tekadi.

( PART – V )

O – P :

Line starts from point ‘O’ in village Tekadi, passes along the outer boundary of plot numbers

610, 605, then passes along the outer boundary of MSEB land and meets at point ‘P’.

P – Q :

Line starts from point ‘P’, passes in west direction along the outer boundary of MSEB land then

passes in south direction along the outer boundary of plot number 603 and meets at point ‘Q’ in

village Tekadi.

Q – R :

Line starts from point ‘Q’, passes along the outer boundary of plot numbers 603, 606, 607 and

meets at point ‘R’ in village Tekadi.

R – S :

Line starts from point ‘R’, passes along the outer boundary of plot numbers 607/1, 607/2 then

passes in north-west direction along the outer boundary of plot numbers 609/1A, 609/1B, 609/2

and meets at point ‘S’ on the east boundary of road.

S – T :

Line starts from Point ‘S’ in village Tekadi, passes along east side of the road in south direction,

crosses the road and meets at point ‘T’ on the west side of the road.

T – U :

Line starts from point ‘T’, passes in north direction along the west side of the road and meets at

point ‘U’ on west side of the road near the plot number 623/3.

U–V–W-X :

Line starts from point ‘U’ passes through south boundary of plot number 623/3, turns in north

direction through point ‘V’ then passes along the west boundary of plot number 623/3 then turns

in east direction through point ‘W’, passes along the north boundary of plot number 623/3 and

meets at point ‘X’ on north-east corner on plot number 623/3.

X – O :

Line starts from point ‘X’ in village Tekadi , crosses the road passes in south direction along the

east side of road and ends at starting point ‘O’ on east side of the road near plot number 610.

( PART – VI )

Y – Z - Y :

Encompasses the plot number 588/1 and part Government land in village Tekadi.

( PART – VII )

A1 – B1 :

Line starts from point ‘A1’ in village Tekadi , passes in east direction along the north boundary

of plot number 532, then passes in south-east direction along the outer boundary of plot numbers

529, 587 and meets at point ‘B1’.

B1 – A1:

Line starts from point ‘B1’, passes through plot number 587 in west direction then passes along

the outer boundary of plot number 532 and ends at starting point ‘A1’ in village Tekadi.

68 THE GAZETTE OF INDIA : JANUARY 16, 2021/PAUSHA 26, 1942

[PART II—SEC. 3(ii)]

( PART – VIII )

C1 – D1-

E1- C1 :

Encompasses the plot number 538 in village Tekadi .

( PART – IX )

F 1:

Encompasses the single plot number 581 in village Tekadi .

( PART –X )

G1 – H1 –

I1 – J1- G1: Encompasses the western part of single plot number 493 in village Tekadi.

( PART – XI )

K1 – L1 :

Line starts from point ‘K1’ in village Tekadi, passes in south-east direction along the north

boundary of plot numbers 635, 634/3 and meets at point ‘L1’.

L1 – M1 :

Line starts from point ‘L1’, passes in south direction along the outer boundary of plot numbers

634/3, 635, 632, passes in east direction along the outer boundary of plot numbers 626, 625 then

passes in south direction and meets at point ‘M1’.

M 1– N1 :

Line starts from point ‘M1’, passes in west direction along the south boundary of plot numbers

625, 627 and meets at point ‘N1’.

N1 – O1 :

Line starts from point ‘N1’, passes along the outer boundary of plot numbers 627, 629, 636/3B

passes in north direction along the common village boundary of village Tekadi and Gondegaon

and meets at point ‘O1’.

O 1– K1 :

Line starts from point ‘O1’, passes in east direction along the north boundary of plot numbers

636/3A/1, 636/3A/2, 636/3/B then passes in north direction along the west boundary of plot

number 635 and ends at starting point ‘K1’.

(PART – XII )

P1 :

This part encompasses single plot number 624/2.

[F. No. 43015/09/2020-LA&IR]

RAM SHIROMANI SAROJ, Dy. Secy.

श्रम और रोिगार मंत्राल

नई दिल्ली, 7 िनवरी, 2021

का.आ. 32.—औद्योजगक जववाि अजिजन म, 1947 (1947 का 14) की िारा 17 के अनुसरण में केंरी

सरकार मेससग अिीक्षण पुरातत्वजवि, भारती पुरातत्व सवेक्षण, सामंतपुर, भुवनेश्वर एवं उनके कमगचारी के

प्रबंितंत्र के संबद्ध जन ोिकों और उनके कमगकारों के बीच अनुबंि में जनर्िगष्ट औद्योजगक जववाि में केन्री सरकार

औद्योजगक अजिकरण एवं श्रम न् ा ाल -2, भुवनेश् वर के पंचाट (संिभग सं्‍ ा 64/2019) को प्रकाजित करती िज िो

केन्री सरकार को 31.12.2020 को प्राप्त हुआ ा।

[सं. एल-42025/07/2021-आईआर-(डी ू)]

डी. के. जिमांिु, अवर सजचव

MINISTRY OF LABOUR AND EMPLOYMENT

New Delhi, the 7th January, 2021

S.O. 32.—In pursuance of Section 17 of the Industrial Dispute Act, 1947 (14 of 1947), the Central

Government hereby publishes the award (ID No. 64/2019) of the Central Government Industrial-Tribunal-cum

Labour Court, Bhubaneswar-2 as shown in the Annexure, in the Industrial dispute between the employers in

[भाग II— ण् ड 3(ii)]

भारत का रािपत्र : िनवरी 16, 2021/पौष 26, 1942

69

relation to The Superintending Archeologist, Archaeological Survey of India,Samantrapur, Bhubaneswar Others

and their workmen, which was received by the Central Government on 31.12.2020.

[No. L-42025/07/2021-IR (DU)]

D. K. HIMANSHU, Under Secy.

ANNEXURE

IN THE CENTRAL GOVERNMENT INDUSTRIAL TRIBUNAL-CUM-LABOUR COURT,

BHUBANESWAR

INDUSTRIAL DISPUTE CASE NO. 64 OF 2019

Dated Bhubaneswar, the 9th December, 2020

Present: Shri B.C. Rath, Presiding Officer,

C.G.I.T-cum-Labour Court, Bhubaneswar

Between:

1.

The Superintending Archeologist,

Archaeological Survey of India,

1st floor, Purattattva Bhavan,

Samantrapur, Bhubaneswar-751002.

2.

The Superintending Archeologist,

Archeological Survey of India (Chemist),

2nd floor, Purattattva Bhavan,

Samantrapur, Bhubaneswar-751002.

…First party managements

AND

Sri Sanjay Dutta Mohapatra,

S/o: Nilakantha Dutta Mohapatra,

At-West Gate, Baseli Sahi,

Jagannath Temple, Puri, Odisha.

…Second party workman

Appearances:

Shri Vijay Prasad Gupta,

Assistant Superintending

Archeological Chemist

: For first party managements

Sri Sanjay Dutta Mohapatra

: The second party workman himself

AWARD

The Government of India, Ministry of Labour have referred the industrial dispute for adjudication vide

its Order No.08(01)/2019/DY.CLC/BBSR/B.IV dated 07.08.2019 in exercise of powers conferred by clause (d)

of sub-section (1) and sub-section (2A) of Section 10 of the Industrial Disputes Act,1947 (14 0f 1947) (here in

after referred to as ‘the Act’) and the terms of reference reads as follows:

“Whether the management of Archaeological Survey of India, Bhubaneswar is justified in denying

conferment of temporary status and regularization in service under the scheme, which came into effect

from 01.09.1993 to Sri Sanjay Dutta Mohapatra by issuing letter No.BD/CAT/99-2010 is legal and/or

justified? If not what relief the workman is entitled to?”

2.

Sworn of unnecessary details the case of the second party workman as emerging from his statement of

claim is that he was engaged as a Skilled Supervisor on daily wage basis in Chemical Branch of Archaeological

Survey of India at Lord Jagannath Temple, Puri since 1990. Prior to that he was also working as a daily wager

under the first party managements from 1986 to do such chemical works in different places. In the year, 1993

the Central Government introduced a scheme of permanent status and regularization which came into effect on

1.9.1993. As per the said scheme, the daily wagers on employment/engagement under the Central Government

on 1.9.1993 and who completed 240 days engagement in a calendar year preceding to the notification i.e.

10.9.1993 are to be conferred with permanent status. It is the claim of the second party workman that he was

engaged for more than 240 days in the calendar year preceding to the introduction of the scheme. As it was five

working days in a week in Central Government, he was required to render continuous service for a period of 206

days in the calendar year. He has asserted that he was working as a daily wager on the date of notification of the

70 THE GAZETTE OF INDIA : JANUARY 16, 2021/PAUSHA 26, 1942

[PART II—SEC. 3(ii)]

scheme, but the managements did not confer him with the permanent status as per the scheme despite he had

qualification to hold the post of Laboratory Assistant being a science graduate and four numbers of vacancies of

Laboratory Assistants were available under the first party managements. He was assured of employment for

such a post of Laboratory Assistant by the managements as he was rendering good services in the archaeological

maintenance of Jagannath Temple, Puri. He made a representation to the first party managements for

conferment of permanent status to him. When the managements did not pay any heed to his claim, he preferred a

case in the learned CAT, Cuttack Bench praying for conferment of permanent status and consequently

regularization in terms of the scheme. The management contested his claim taking a stand that he did not

complete 240 days as a daily wager in the calendar year. The learned CAT dismissed his application an d he

preferred a writ before Hon’ble High Court of Orissa vide WP(C) No.14668 of 1999. The managements

contested the writ also. The Hon’ble High Court in its order dtd.2.2.2020 directed the managements to

reconsider the claim of the second party workman for conferment of employee status by recalculating the

number of working days in terms of judgment passed in the case between Workmen of American Express

International Banking Corporation Vrs. Management of American Express International Banking

Corporation reported in AIR 1986 Supreme Court 458. The managements preferred a SLP vide Civil Appeal

No.17640 of 2010 before Hon’ble Supreme Court and the same was dismissed in admission stage. Pursuant to

the direction of the Hon’ble High Court of Orissa he made a representation to the first party managements. But,

his request for permanent status was rejected. Hence, he raised a dispute before the labour machinery and

consequent upon which the reference is made as noted above since the conciliation effort was failed to resolve

the dispute.

3.

The first party managements have filed a joint WS contesting the claim. According to the first party

managements the scheme is applicable to casual labourers who are in employment on daily wage basis on the

date of issue of office memorandum and who rendered a continuous service of at least 240 days in a calendar

year preceding to the scheme. The second party workman was not in employment on the date of notification of

this scheme and he did not also rendered service of 240 days in the calendar year as a daily wager. Therefore, he

was not entitled to the conferment of permanent status under the scheme. The management has further averred

that in working site six days in a week is being adopted whereas Central Govt. Offices are obs erving five days in

a week. The disputed workman having completed less than 240 days engagement in working site and not being

employed on the date of notification of this scheme is not entitled to such permanent status. Hence, prayer has

been made for rejection of the claim statement.

4.

On the pleadings of the parties following issues have been settled for just and proper adjudication of

the dispute

ISSUES

i)

Is the reference maintainable in the eye of law?

ii)

Whether the workman was engaged temporarily on daily wage basis by the first party

management and continued to work as such from the year 1986 to 1.9.1993 and thereafter ?

iii)

Whether he was employed for more than 206/240 days in the calendar year preceding to

1.1.1993?

iv)

Whether he was entitled to be benefited in the scheme of temporary status and regularization in

service in the scheme of Government of India which came into effect from 1.9.1993,if not, to

what relief he is entitled to?

5.

In order to substantiate his case, the second party workman has examined himself as W.W.1 and filed a

large number of documents including a Xerox copy of log book of Archeological Survey of India, Puri showing

the workload in Jagannath Temple for the year, 1994-95, Xerox copy of office memorandum of Govt. of India

showing introduction of five days in a week in the offices of Govt. of India, Xerox copy of office memorandum

of Govt. of India in regard to mode of recruitment of casual labourers and identity card issued to him by the first

party management, Xerox copy of experience certificate purportedly issued by some officials of the

managements, his representations made to the managements from time to time, the certified copies of the order

of learned CAT in OA Case No.35 of 1997, order of the Hon’ble High Court in WP(C) No.14668 of 1999,

order of Hon’ble Supreme Court in Civil Appeal No.17640 of 2010 and copies of some correspondences made

between the first party managements and the advocate of the workman in connection to compliance of directions

of the Hon’ble High Court. On the other hand, one Sri Vijaya Prasad Gupta, Assistant Superintending

Archeological Chemist, Bhubaneswar Division has been examined as MW No.1 on behalf of the first party

managements and Xerox copies of letter dtd.05.05.1994 issued by the Director, order dtd.02.02.2010 of the

Hon’ble High Court passed in OJC No.14668 of 1999, letter dtd.24.9.2010 issued by the SA (Chemist), letter

dtd.8.6.995 issued by the Director (Science), order dtd.28.7.1999 of Hon’ble CAT passed in OA No.35 of 1997,

[भाग II— ण् ड 3(ii)]

भारत का रािपत्र : िनवरी 16, 2021/पौष 26, 1942

71

order dtd.28.9.1999 of Hon’ble CAT passed in R.A No.18 of 1999, copy of letter dtd.24.1.2012 issued by

Suptdg. Archl. (Chemist), Bhubaneswar and letter dtd.3.4.2012 issued by Asst. Suptdg. Archl. Chemist,

Bhubaneswar are filed (marked as Ext.A to Ext.H) by the managements to refute the claim of the second party

workman.

FINDING

6.

For the sake of convenience all the issues are taken into consideration simultaneously.

It is seen from the pleadings and evidence of the parties that there is no serious dispute to the fact that

the second party was engaged on daily wage basis by first party managements for doing archeological

maintenance work in the Jagannath Temple, Puri. Though the first party managements had disputed the claim of

the second party workman as to his employment/engagement of the date of issue of office memorandum i.e.

10.09.1993, it is emerging from the oral testimony of MW No.1 as well as the pleading of the managements as

reflected in OA No.35 of 1997 that the disputant was first engaged on daily wage basis in the year, 1990 and

since then he was attached to the work as a casual labourer on daily wage basis. Further, it is seen from the order

passed in OA Case that it was the assertion of the first party managements before the learned CAT that the

workman was only engaged for 52 days in between 25.11.1990 to 2.2.1991 and thereafter, he was engaged for

71 days in between 19.3.1993 to 31.5.1993. Undisputedly, Ext.C showing the calculation sheet of working days

of the second party workman in between 09.11.1992 to 10.11.1993 as prepared by the managements themselves

indicates that the workman was engaged for 206.5 days in the preceding year to the notification. It is noticed

from the calculation sheet prepared and produced by the managements that the disputant was engaged for at

least 25 days in each month in between November to May, whereas he has been shown not engaged throughout

the month of June, July and August as well as September, 1993. When the engagement of the disputant was

required near about 25 days in a month in between September, 1992 to May, 1993, it is difficult to believe that

he was not engaged for a single day in next three months when his engagement is admitted in October, 1993

onwards. It is elicited from cross-examination of MW No.1 that the calculation sheet is prepared on the basis of

muster roll showing engagement of the workman. The said muster roll is available in the office. When there is

inconsistency and discrepancy in the pleadings advanced by the managements before the learned CAT an d in

this Tribunal in respect of the number of days engaged as casual labourer and availability of muster roll is

admitted as well as there is no serious dispute to the employment of the workman as a casual labourer from the

year, 1990 it has to be presumed that the workman has discharged his burden/onus of proving that he was under

employment of the first party managements for more than 240 days as a casual labourer in the preceding year to

the OM introducing permanent status. He was a daily wager on the date of notification of the scheme. Thereby,

two conditions preceded to conferment of permanent status are established. Now the burden shifts to the

managements to refute the presumption.

That apart, it is not disputed that the organization of the first party management is a Central

Government organization where five working days in a week is adopted. But, it is the claim of the management

that five working days in a week is adopted in the administrative offices whereas works executed at site is six

days in a week. The office memorandum of the Govt. of India in this regard as filed by the managements does

not suggest that five days in a week in the administrative offices of the Govt. of India is not applicable to the

working site. As per the said office memorandum the working hour is from 10 AM to 6 PM. There is nothing

either in the averment of the managements or in oral evidence of MW No.1 to suggest or to show that the

second party workman was engaged less than 8 hours in a day so as to his working days could be counted six

days in a week. Hence, as per the own pleading and evidence of the managements the workman is found to have

completed 206 days in the preceding year to the notification of the OM if five days in a week is counted for

calculating the period of his engagement keeping in view the provision of sections 25-F and 25-B of ID Act is

taken into consideration. The order dtd.2.2.2010 of Hon’ble High Court passed in OJC No.14668 of 1999

mandates that the claim of the workman for permanent status is to be taken into consideration having regard to

number of days engaged in preceding year vis-à-vis recalculating the working days in terms of judgment passed

in the case between Workmen of American Express International Banking Corporation Vrs. Management

of American Express International Banking Corporation reported in AIR 1986 Supreme Court 458. Had it

been shown it can be said being five working days in a week the workman completed 206 working days in the

preceding year and thereby, he is entitled to conferment of permanent status as per the scheme. The

managements have also not given explanation for non-production of the muster roll from which the actual

number of days on engagement of the second party workman could be ascertained. When the first party

72 THE GAZETTE OF INDIA : JANUARY 16, 2021/PAUSHA 26, 1942

[PART II—SEC. 3(ii)]

managements have shown the engagement of the workman for more than 20 to 25 days in a month in between

October, 1992 to May 1993 it is difficult to believe on the basis of calculation sheet filed by the management

that the workman was not engaged for a single day in between June to September, 1993. Hence, the

managements fail to dislodge the inference as drawn earlier that the workman completed 240 days engagement

as a casual labourer preceding to the OM.

The workman is a daily wager and as such he is not expected to be in possession of any record or

document to establish his claim that he worked for 240 days in the calendar year preceding to the OM. Being a

daily wager he is also not excepted to show that he was engaged as a casual labourer and continued as such

when the OM was introduced. The managements being in possession of the muster roll and other connecting

papers are required to adduce credible evidence to refute the claim of the workman when it is not disputed by

them that the workman was working under their establishment as a casual labourer to carry out certain works in

Jagannath Temple and they have admitted through a calculated sheet prepared by themselves showing the

engagement of the disputant for 206.5 days in the preceding year. In the facts and circumstances as discussed

above, it is to be held that the disputant workman was working as a casual labourer on daily wage basis under

the first party managements on the date of introduction of the scheme of permanent status and he completed 240

days engagement as a casual labourer in the calendar year preceding to the date of notification of the OM. It is

not out of place to note here that in the case between Union of India and Another Vrs. Mohan Pal Etc. Etc.

in Appeal (civil) 3168 of 2002 the Hon’ble Supreme Court have set out that in order to acquire ‘temporary’

status , the casual labourer should have been in employment as on the date of commencement of the Scheme and

he should have also rendered a continuous service of at least one year which mean that he should have been

engaged for a period of at least 240 days in a year or 206 days in case of offices observing 5 days a week . As

two conditions are fulfilled for conferment of permanent status as per the scheme introduced on 10.9.1993 the

workman is entitled to avail the benefit under the scheme.

Having regard to the pleadings of the parties that the second party was engaged on daily wage basis it

can be said that employee-employer relationship was existing between the parties on the date of introduction of

OM. It is also emerging from the pleadings that the disputant was a casual labourer till he was not provided

engagement from the year, 1997. There is nothing either in the pleading or evidence of the managements to

establish that the disputant was provided notice pay and retrenchment compensation as required under section

25-F of the Act before refusal of employment to him. When the reference is confined to decide if the claim of

the second party workman for conferment of permanent status is justified and legal, and to what relief he is

entitled to, it would not be outside the jurisdiction of the Tribunal to hold the managements to be duty bound

under the scheme of permanent status to confer such permanent status to the workman w.e.f.10.9.1993 as the

workman was under employment as a casual labourer as well as completed 206/240 working days preceding to

the date of notification of the scheme. Had he been continuing in the work as a casual labourer he could have

been conferred with the permanent status and availed benefits of the scheme including his regularization in

service. But, the workman did not render any service from the year, 1996-97 onwards due to his disengagement.

His such disengagement being not in conformity to the provisions of section 25-F is illegal.

Having regard to the findings as discussed above it would be just and appropriate to direct to the first

party managements to confer the permanent status to the workman from the date of notification of the scheme as

if he deemed to be continuing in service. Hence, the workman shall be entitled to all the benefits as available to

a workman conferred with permanent status from the date of introduction of the scheme, but he is not entitled to

financial benefits accrued to him for the period of his non-engagement till the notification of the Award on the

principle of “no work no pay”. The managements are directed to extend all benefits of permanent status as well

as regularization of his service as per the scheme within two months of notification of the Award deeming that

the second party is continuing in engagement, failing which the workman is entitled to 6.5% interest on the

financial benefits from the date of notification of the Award till the benefit is extended to him.

Accordingly the reference is answered and Award is passed.

Dictated and corrected by me.

B. C. RATH, Presiding Officer

[भाग II— ण् ड 3(ii)]

भारत का रािपत्र : िनवरी 16, 2021/पौष 26, 1942

73

नई दिल्ली, 7 िनवरी, 2021

का.आ. 33.—औद्योजगक जववाि अजिजन म, 1947 (1947 का 14) की िारा 17 के अनुसरण में केन्री

सरकार मेससग एडीए और सिा क अिीक्षक, डाक घर, िोसापेटे सब-जडवीिन, िोसपेटे, बैंगलोर (कनागटक),

पोस्ट्टमास्ट्टर िनरल, एनके क्षेत्र, िारवाड़ श्री के नागरािा,कमगचारी के प्रबंितंत्र के संबद्ध जन ोिकों और उनके

कमगकारों के बीच अनुबंि में जनर्िगष्ट औद्योजगक जववाि में केन्री सरकार औद्योजगक अजिकरण एवं श्रम न् ा ाल ,

बैंगलोर के पंचाट (संिभग सं्‍ ा 03/2019) को प्रकाजित करती िज िो केन्री सरकार को 05.01.2021 को प्राप्त हुए

े ।

[सं. एल-42025/07/2021-आईआर-(डी ू)]

डी. के. जिमांिु, अवर सजचव

New Delhi, the 7th January, 2021

S.O. 33.—In pursuance of Section 17 of the Industrial Dispute Act, 1947 (14 of 1947) the Central

Government hereby publishes the award (Ref. No. 03/2019) of the Central Government Industrial Tribunal-

cum-Labour Court, Bangalore as shown in the Annexure, in the Industrial dispute between Sh Nagaraja and the

employers in relation to The ADA & Asst Supdt. Of Post Offices, Hosapete Sub-Division, Hosapete Bangalore

(Karnataka) and The Post Master General, NK Region, Dharward, Sh K Nagaraja, which were received by the

Central Government on 05.01.2021.

[No. L-42025/07/2021-IR (DU)]

D. K. HIMANSHU, Under Secy.

ANNEXURE

BEFORE THE CENTRAL GOVERNMENT INDUSTRIAL TRIBUNAL-CUM-LABOUR COURT,

BANGALORE

DATED : 31ST DECEMBER, 2020

PRESENT : JUSTICE SMT. RATNAKALA, Presiding Officer

ID 03/2019

I Party

II Party

Sh. K Nagaraja,

S/o Jutlappa,

R/o Kurekuppa Village,

Sandur Taluk,

Bellary District - 583 123.

1. ADA & Asst. Supdt. of Post Offices,

Hosapete Sub-Division,

Hosapete - 583 201.

2. The Post Master General,

NK Region, Dharward - 580001.

Appearance

Advocate for I Party : Mr. Basavaraj B. Advani

Advocate for II Party : Smt. R Vijayakumari

AWARD

It is a petition filed under Sec 2-A read with Sec 10 of the Industrial Dispute Act, 1947 (for brevity ‘the

Act’). The petitioner is challenging the penalty of Removal from Service dated 13.02.2013 imposed on him by

the Disciplinary Authority. His case is, he was the permanent employee of the Respondent working as GDSMC

at Challagurki Post Office of Ballari District; on his absence for few days on health grounds, the Disciplinary

Authority initiated enquiry against him: the Enquiry was concluded in one day on obtaining his confession

statement: the Enquiry Officer has drawn his finding holding that the workman is guilty of the charges. The

Domestic Enquiry was held without providing sufficient opportunity to him to defend his case: the confession

statement was dictated and obtained by the Enquiry Officer to suit their motive against him. The opportunity of

74 THE GAZETTE OF INDIA : JANUARY 16, 2021/PAUSHA 26, 1942

[PART II—SEC. 3(ii)]

cross examination of the Reporting Official was taken by the Enquiry Officer: the Enquiry proceeding was

drawn in English, later on the statement of the workman was recorded in Kannada on the dictation of the

Enquiry Officer: he was threatened to sign the statement otherwise to face drastic consequence. The major

penalty of Removal from Service does not commensurate to the alleged act of misconduct.

2.

The claim is contested by the 2nd Party on the following lines : he was not a permanent employee, his

service was governed by Gramina Dak Sevaks (Conduct and Engagement) Rules 2011: he remained absent from

01.12.2011 unauthorisedly: he remained absent for a period of 83 days from 02.09.2011 to 30.11.2011 on the

ground of ill health of himself and his family member. Again he applied for LWA from 01.12.2011 to

31.12.2011, same was not granted: he was directed to join duty vide letter dated 15.12.2011, same is served on

him, but he did not report to duty. Another call notice dated 16.01.2012 was sent to him through RPAD, but the

postal cover returned unserved with remarks “Addressee not in Station”. Another notice dated 18.02.2012 was

delivered on 21.02.2012; he did not join duty and not even responded to the notice; he remained absent totally

for a period of 374 days unauthorisedly. During the enquiry he did not utilise the opportunities given to him: he

failed to submit his written statement. During the Preliminary Inquiry the charges were read over to him in

Kannada language, after understanding the same he admitted the charges. The Enquiry Officer concluded the

enquiry since he admitted the charges. The Enquiry Officer submitted his report to the 1st Respondent on

21.01.2013 holding that the charges as proved. The Authority issued show cause notice to the petitioner on

28.01.2013 but he did not submit his reply. Vide order dated 13.02.2013 he was removed from service: he

preferred appeal after a lapse of 1 year against the order of removal and the same is rejected on 24.02.2014. He

filed a petition dated 24.03.2014 before D.P.S N K Region, Dharwad: said petition was dismissed vide memo

dated 22.07.2014, by holding that there is inordinate delay in submitting the appeal and the delay is not

sufficiently explained.

3.

It is further contended by the 2nd Party that, during the Domestic Enquiry sufficient opportunity was

extended to him by the Enquiry Officer: his allegation against the Enquiry Proceedings, recording his confession

under threat are all false: he had unequivocally admitted the charge before the Enquiry Officer: he had all

opportunity to defend himself during the enquiry or after the enquiry by replying to the show cause notice issued

by the 1st Respondent. He has failed to utilise the opportunity: he is guilty of misconduct on intentional absence

unauthorisedly. The action taken against him is clear and justifiable.

4.

Subsequent to registration of the case, the 1st Party has not appeared before this Tribunal to prosecute

his case. The notice issued to him though was served none appeared to represent him. He is not diligent in

prosecuting his claim. Hence, it is inevitable to dismiss the petition for non-prosecution.

AWARD

The petition filed by Sh. K. Nagaraja under Sec 2-A read with Sec 10 of the Industrial Dispute Act,

1947 is dismissed for non-prosecution. He is not entitled for any relief.

(Dictated to o/s Steno, transcribed by her, corrected and signed by me on 31st December, 2020)

Justice Smt. RATNAKALA, Presiding Officer

नई दिल्ली, 7 िनवरी, 2021

का.आ. 34.—औद्योजगक जववाि अजिजन म, 1947 (1947 का 14) की िारा 17 के अनुसरण में केंरी

सरकार मेससग उप-मिाप्रबंिक, एमएमटीसी जलजमटेड, िगतससंिपुर, (ओजडिा) और प्रबंिक, स्ट्टार वन जसक् ोठरटी

सर्वगसेि, ेकेिार, िगतससंिपुर, (ओजडिा) एवं उनके कमगचारी के प्रबंितंत्र के संबद्ध जन ोिकों और उनके कमगकारों

के बीच अनुबंि में जनर्िगष्ट औद्योजगक जववाि में केन्री सरकार औद्योजगक अजिकरण एवं श्रम न् ा ाल -2, भुवनेश्वर

के पंचाट (संिभग सं्‍ ा 92/2012) को प्रकाजित करती िज िो केन्री सरकार को 31.12.2020 को प्राप्त हुआ ा।

[सं. एल-42012/47/2012-आईआर-(डी ू)]

डी. के. जिमांिु, अवर सजचव

[भाग II— ण् ड 3(ii)]

भारत का रािपत्र : िनवरी 16, 2021/पौष 26, 1942

75

New Delhi, the 7th January, 2021

S.O. 34.—In pursuance of Section 17 of the Industrial Dispute Act, 1947 (14 of 1947), the Central

Government hereby publishes the award (ID No. 92/2012) of the Central Government Industrial-Tribunal-cum

Labour Court, Bhubaneswar-2 as shown in the Annexure, in the Industrial dispute between the employers in

relation to The Dy. General Manager, MMTC Ltd, Jagatsinghpur, Orissa and The Manager, Star One Security

Services, Contractor, Jagatsinghpur, Orissa, and their workmen, which was received by the Central Government

on 31.12.2020.

[No. L-42012/47/2012-IR (DU)]

D. K. HIMANSHU, Under Secy.

ANNEXURE

IN THE CENTRAL GOVERNMENT INDUSTRIAL TRIBUNAL-CUM-LABOUR COURT,

BHUBANESWAR

Present: Shri B.C. Rath, Presiding Officer,

C.G.I.T-cum-Labour Court, Bhubaneswar

INDUSTRIAL DISPUTE CASE NO. 92 OF 2012

Dated Bhubaneswar, the 11th December, 2020

Between:

1.

The Manager,

M/s. Star One Security Services, Contractor,

M/s. MMTC Ltd., Madhuban, Paradip,

PO : Paradip Port, Plot No.3/93,

Brundaban Colony, Dt. Jagatsinghpur,

Orissa.

2.

The Dy. General Manager,

M/s. MMTC Ltd.,

Madhuban, Paradip,

Near Jagannath Temple,

Paradip Port, Dt.: Jagatsinghpur,

Orissa.

…First Party Managements

(AND)

The Working President,

Paradip Dock & Transport Workers’ Union,

Nisamani Bhawan, Paradip Oort,

Dist.: Jagatsinghpur, Orissa.

… Second Party Workman

Appearances:

None

: For management No.1

Shri Ch. S. Prasad Rao,

Dy. General Manager,

Authorised Representative

: For the management No. 2

Sudhaka Mantry

Working President

: For and on behalf of the workman/Union

AWARD

The Government of India, Ministry of Labour have referred the industrial dispute for adjudication vide

its Order No. L-42012/47/2012-IR(DU) in exercise of powers conferred by clause (d) of sub-section (1) and

sub-section (2A) of Section 10 of the Industrial Disputes Act,1947 (14 of 1947) (here in after referred to as ‘the

Act’) and the terms of reference reads as follows:

“Whether the action on the part of the M/s. Star One Security Services, Contractor, working under

M/s.MMTC Ltd., Paradip in terminating the services of Shri Kanhu Charan Senapati, Electrician

without complying section-25(F) of Industrial Disputes Act, 1947 is legal and justified? If not, what

relief the workman is entitled to? (b) Whether the action on the part of the management of MMTC Ltd.,

Paradip engaging Shri Kanhu Charan Senapati, Electrician in PPT in emergency work and issuing

experience certificate and not considering for his absorption in MMTC is justified?’’

76 THE GAZETTE OF INDIA : JANUARY 16, 2021/PAUSHA 26, 1942

[PART II—SEC. 3(ii)]

2.

Bereft of unnecessary details, the case of the second party workman as emerges from his claim

statement is that he was working under the management No.2 M/s. MMTC Ltd from 12.1.2002 to 28.2.2010

continuously when his service was terminated. In the process, he rendered continuous service to management

No.2 for more than 8 years. But, he was not provided notice pay as well as retrenchment compensation as

required under the provisions of section 25-F of ID Act before his termination. He was receiving wages of

Rs.3500/- per month. It is his assertion that though he was engaged through different contractors for different

spans of period, he was paid wages by the first party management No.2 and he was working under direct control

and supervision of the authority of the said management. His termination without notice pay and retrenchment

compensation being illegal he is entitled to reinstatement in service with full back wages and other service

benefits.

3.

The contactor i.e. M/s.Star One Security Services (management No.1) did not appear and contest the

claim in spite of service of notice, as a result of which it has been set ex-parte. The management No.2

M/s.MMTC Ltd. has contested the claim pleading, inter alia, that no employer-employee relationship was there

between the parties. The second party workman was not given any appointment directly or indirectly by the

management No.2. The management No.2 has its own Recruitment Rule and as such question did not arise to

engage the disputant directly under the control and supervision of the management No.2 without following the

Recruitment Rule. The stand the of the management No.2 is that contractors are being entrusted from time to

time for the purpose of electrical maintenance and repair work for its quarters. In between 2002 to 2010

different contractors were issued with work orders for such maintenance and repair work. The second party

workman was last engaged by the contractor M/s. Star One Security Services and the said contractor is only

answerable to the termination of the disputant, if any. There being no employer-employee relationship between

the parties the reference is not maintainable in the eye of law. As the workman was not appointed or engaged by

the first party management No.2, question did not arise for termination of his service by it. Hence, prayer is

made for the rejection of the claim statement of the second party workman.

4.

On the pleadings of the parties following issues have been settled for adjudication of the dispute :-

ISSUES

(i)

Whether the services of Shri Kanhu Charan Senapati was terminated by M/s. Star One Security

Services, Contractor of M/s. MMTC Limited in violation of Section 25-F of the ID Act?

(ii)

Whether the action of the M/s. MMTC Limited, Paradip engaging Shri Kanh Charan Senapati,

Electrician in PPT in emergency work and not absorbing in MMTC is justified?

(iii) If so, to what relief the second party-workman is entitled?

5.

In order to substantiate his case while the second party besides examining himself as WW No.1 has

adduced evidence of another witness WW No.2 and filed the Xerox copies of his entry pass permit issued by

Traffic Department to work in the prohibited area of MMTC, pass issued to him by the Paradip Port Trust to

work in the prohibited area of MMTC, permit issued by the MMTC to Paradip Port Trust for issuing passes,

letters of MMTC issued to Paradip Port Trust to issue gate passes, experience certificates issued by MMTC to

him, provident fund slips issued to him, attendance and maintenance registers maintained by the first party

management No.2, electrical workman certificate issued in his favour, his ration card, his bank pass book,

Voter List-II of Municipality, his Voter I-card, work orders issued in favour of the contractors by the MMTC,

his matric certificate, his dock entry permits, letter dtd.20.07.2010 addressed to DLO issued by the management,

letter dtd. 22.11.2020 addressed to ALC(C) issued by the management, letter dtd.19.08.2020 addressed to DLO,

Jagatsinghpur by MMTC Ltd which are marked as Ext.1 to Ext.18. The first party management No.2, on the

other hand has examined one witness, namely Bhaskar Prasad Mohapatra, Deputy General Manager and proved

the copy of the written statement filed by it before ALC(C), Bhubaneswar as Ext.A to refute the claim of the

second party workman.

FINDINGS

ISSUE NO. II

6.

Out of the issues as framed by this Court, issue No. II being on the question of absorption of the second

party by management No.2 under it, the same is taken up first part for determination.

As it emerges from the pleadings of the second party workman Union and oral testimony of the

disputant workman (WW No. 1) that the disputant was engaged in the electrical maintenance and repair work

for the quarters of the first party management No. 2 through different contractors for different periods from

12.01.2002 onwards till alleged termination of his service in January, 2010. There is neither any specific

pleading or evidence to the effect that the workman was receiving wages directly from the management No. 2 or

[भाग II— ण् ड 3(ii)]

भारत का रािपत्र : िनवरी 16, 2021/पौष 26, 1942

77

he was directly under the control and supervision of the said management. In order to establish the relationship

of employer-employee between the management No. 2 and the workman, the disputant has to establish (i) that

he was receiving salary/wages from the employer i.e. the management No. 2 and (ii) the management No.2 was

controlling and supervising his employment and work. In the above aspects, it is evident that the disputant was

receiving wages from his contractors throughout the period of his employment for electrical maintenance and

repair work. There is also no specific pleading and evidence that any agreement between the contractor and the

principal employer i.e., the first party management No. 2 or the issuance of work order to different contractors

were camouflage to deprive the disputant’s service benefits from management No. 2. The EPF slips relied upon

by the disputant do not reveal that the employer contribution was paid by the management No.2, for which the

said management can be treated/presumed his employer. Undoubtedly, gate pass of the workman was issued by

the Security Officer–in-Charge of Paradip Port Trust by showing the disputant’s entry to the prohibited area for

purpose of Electrical installation/electrical work for M/s. MMTC Ltd. But the same does not establish that the

gate pass was issued to him on account of he being an employee of the first party management No. 2 or he was

issued with the gate pass on the request of the said management. Similarly, occupation of a quarter of M/s.

MMTC Ltd. by the disputant does not lead to a conclusion that he was employed or engaged by the management

of MMTC Ltd. and therefore, employer-employee relationship existed between them.

On the other hand, it is evident from the claim statement as well as oral testimony of the disputant that

he was terminated from service w.e.f.1.3.2010 by the first party management No. 1 without compliance of

mandatory provisions of section 25-F the Act. Be that as it may, the disputant cannot be held as an employee

under the management No. 2. That apart, he has admitted in his cross-examination that he had no document to

show that he was appointed as an Electrician by the management No. 2 or the said management had issued any

experience certificate to him. He has also admitted that there was no advertisement for the post of Electrician

under management No. 2. No interview was ever held by the management No. 2 for appointment of any

Electrician. Under the above pleadings and evidence it can be safely concluded that there was no employer-

employee relationship between the first party management No.2 and the disputant. In that view of the matter the

disputant cannot be said to be a workman of the management No.2. Hence, any dispute raised by him against the

said management for regularisation of service under the said management cannot be maintainable. Accordingly

the issue No.2 is answered in favour of the management No.2.

ISSUE NO. I

7. Coming to the issue it is found that the disputant worked for 28 days only under the first party

management No.1. It is his own pleading and evidence that his service was hired through different contractors.

MW No.1 has categorically stated that the disputant was working under different contractors. Thus, it is evident

that the disputant did not work continuously for 240 days in a calendar year under management No.1 so as to

make it liable for any relief on account of his termination being made without notice pay and retrenchment

compensation. So, this issue is answered against the disputant workman.

ISSUE NO. III

8.

The disputant workman has claimed reinstatement and regularisation of service under management

No.2 on a contention that he rendered service to the said company for more than 8 years with all sincerity and

devotion of work. He was allotted with a quarter by the said management for his service to the company.

Though contractors were changed and work orders were issued to different contractors from time to time, he

was discharging his duties under the management No.2 being engaged in name shake by those contractors.

Therefore, keeping in view the long period of service rendered by him he shall be regularised as an Electrician

under the employment of management No.2. But, keeping in view of the finding given in issue No.1 his claim

against management No.2 has no legal sanctity. The dispute raised by him in this regard is not maintainable

against management No.2 on account of there being no employer-employee relationship between them. Hence,

this Tribunal cannot exercise its jurisdiction and pass an Award directing the management No.2 to reinstate and

regularise the service of the disputant workman as an Electrician in his establishment. However, the disputant is

at liberty to make a representation to the authority of the first party management No.2 and the management No.2

should dispose of his representation sympathetically.

Accordingly the reference is answered and Award is passed.

Dictated and corrected by me.

B.C. RATH, Presiding Officer

78 THE GAZETTE OF INDIA : JANUARY 16, 2021/PAUSHA 26, 1942

[PART II—SEC. 3(ii)]

नई दिल्ली, 7 िनवरी, 2021

का.आ. 35.—औद्योजगक जववाि अजिजन म, 1947 (1947 का 14) की िारा 17 के अनुसरण में केन्री

सरकार मेससग मिासजचव, साउ एमसीडी, नॉ ग एमसीडी, ईस्ट्ट एमसीडी, नई दिल्ली और अन् एवं उनके कमगचारी

के प्रबंितंत्र के संबद्ध जन ोिकों और उनके कमगकारों के बीच अनुबंि में जनर्िगष्ट औद्योजगक जववाि में केन्री सरकार

औद्योजगक अजिकरण एवं श्रम न् ा ाल , नई दिल्ली -1 के पंचाट (िुजद्धपत्र) (संिभग सं्‍ ा 165/2015) को

प्रकाजित करती िज िो केन्री सरकार को 21.12.2020 को प्राप्त हुए े ।

[सं. एल-42011/76/2015-आईआर-(डी ू)]

डी. के. जिमांिु, अवर सजचव

New Delhi, the 7th January, 2021

S.O. 35.—In pursuance of Section 17 of the Industrial Dispute Act, 1947 (14 of 1947), the Central

Government hereby publishes the award (Corrigendum) (Ref. No. 165/2015) of the Central Government

Industrial Tribunal-cum-Labour Court New Delhi -1 as shown in the Annexure, in the Industrial dispute

between the employers in relation to The General Secretary, South MCD,North MCD, East MCD, New Delhi &

Others, and their workmen which were received by the Central Government on 21.12.2020.

[No. L-42011/76/2015-IR (DU)]

D. K. HIMANSHU, Under Secy.

ANNEXURE

BEFORE PRESIDING OFFICER: CENTRAL GOVERNMENT INDUSTRIAL-TRIBUNAL-CUM

LABOUR COURT No. 1, DELHI

ID No. 165/2015

General Secretary

…Workman

Versus

MCD, Delhi

…Management

CORRIGENDUM

20.01.2020

Present: Shri B. K. Prasad, Ld. A/R for the claimant.

Ms. Savita Chauhan, Ld. A/R for the SDMC.

Shri Rahul Verma, Ld. A/R for the NDMC.

The matter came up on account of an application filed by the claimant for correction of the award.

Copy of the application was served on the Ld. A/R for the management No.1, i.e. SDMC and management No.2

i.e. NDMC. The award has already been passed against management No.3, i.e. ex-parte.

In the petition filed under Rule 28 of the Industrial Dispute (Central) Rules 1957 the claimant workmen

have stated that reference was received to decide in the following manner,

“Whether the sweeper/Safai Karamcharis are entitled to the enhanced under the 1st ACP Scheme w.e.f.

09.08.1999 after completion of 12 years of service in the pay scale of Rs.2750-4400/- in place of

2610-4000/- and 2nd ACP after completion of 24 years in the pay scale of 3050-4590/- in place of

2750-4400/- in the sanitary wing of the management along with all consequential benefits. If so what

directions are necessary in this respect”.

It has also been pleaded that this tribunal while passing the award due to a clerical error though granted

the relief in favour of the workmen instead of mentioning that the workmen after completion of 12 years of

service are entitled to enhanced first ACP in the pay scale of 2610-4000 which is the old scale which should

have been mentioned as 2750-4400. Similarly while allowing second ACP the tribunal held that the persons on

completion of 24 years are entitled to second ACP in the scale of 2750-4400 instead of mentioning Rs. 3050 to

[भाग II— ण् ड 3(ii)]

भारत का रािपत्र : िनवरी 16, 2021/पौष 26, 1942

79

4590. He also pleaded that para 16 of the Award may be corrected to that effect which is nothing but a clearical

omission apparent on the face of the record.

The Ld. A/Rs for the management agreed that the error has occurred due to a clerical slip and unless

the same is corrected the award cannot be implemented. Considering the same the application filed by the

claimant/workman is allowed and Para 16 of the award is corrected accordingly as follows.

Para 16:- In the aforesaid facts and circumstances of the case, I find merit in the claim of the workmen

and it is held that the workmen viz Sweepers/Safai Karamcharis are entitled to get first financial up gradation on

completion of 12 years of regular services. In the pay scale of Rs. 2750-4400/- viz pay scale of Sanitary Guide

and to get second financial up gradation on completion of 24 years or regular service, in pay scale of Rs.3050-

4590 as per their hierarchy, subject to fulfilment of conditions as specified in RRs and under the ACP Scheme

dated 09/08/1999. The management is directed to grant financial benefits to all the eligible workmen Safai

Karamcharis under the ACP Scheme dated 09/08/2008 and arrears of the same be paid to all such eligible

workmen, within three months from the date of publication of this award. Award is passed accordingly.

Office is directed to communicate the matter to the Appropriate Government for publication o f a

corrigendum in this regard.

PRANITA MOHANTY, Presiding Officer

नई दिल्ली, 7 िनवरी, 2021

का.आ. 36.—औद्योजगक जववाि अजिजन म, 1947 (1947 का 14) की िारा 17 के अनुसरण में, केंर

सरकार ने इसके जलए केंर सरकार के औद्योजगक न् ा ाजिकरण सि श्रम न् ा ाल , भुवनेश्वर-2 के पुरस्ट्कार

(आईडी सं्‍ ा 68/2016) को प्रकाजित दक ा। अनुबंि में, प्रबंि जनिेिक, जत्रवेणी अ ग मूवसग प्राइवेट जलजमटेड,

तजमलनाडु, इंराणी पटना क माइंस, और श्री पंचरत्न मिाकुड के संबंि में जन ोिाओं के बीच औद्योजगक जववाि में,

िो 31.12.2020 को केंर सरकार द्वारा प्राप्त दक ा ग ा ा।

[सं. एल-42025/07/2021-आईआर-(डी ू)]

डी. के. जिमांिु, अवर सजचव

New Delhi, the 7th January, 2021

S.O. 36.—In pursuance of Section 17 of the Industrial Dispute Act, 1947 (14 of 1947), the Central

Government hereby publishes the award (ID No. 68/2016) of the Central Government Industrial-Tribunal-cum

Labour Court, Bhubaneswar-2 as shown in the Annexure, in the Industrial dispute between the employers in

relation to The Managing Director, Triveni Earth Movers Private Ltd, Tamil Nadu, Indrani Patnaik Mines, and

Sri Pancharatna Mahakud, which was received by the Central Government on 31.12.2020.

[No. L-42025/07/2021-IR (DU)]

D. K. HIMANSHU, Under Secy.

ANNEXURE

IN THE CENTRAL GOVERNMENT INDUSTRIAL TRIBUNAL-CUM-LABOUR COURT,

BHUBANESWAR

Present: Shri B. C. Rath, Presiding Officer,

C.G.I.T-cum-Labour Court, Bhubaneswar.

INDUSTRIAL DISPUTE CASE NO. 68 OF 2016 [U/s. 2-A(2)]

Dated Bhubaneswar, the 10th December, 2020

Between:

1.

The Managing Director,

M/s.Triveni Earth Movers Private Ltd.,

Regd. Office : No.22/110, Greenways Road,

FAIRLANDS, SALEM, Tamil Nadu-536016,

Site Office : At: Unchabali, Post : Eamebari,

Dist.: Keonjhar-758034, Odisha.

80 THE GAZETTE OF INDIA : JANUARY 16, 2021/PAUSHA 26, 1942

[PART II—SEC. 3(ii)]

2.

Mines Manager,

M/s. Indrani Patnaik Mines,

H.O : -A/6, Commercial Estate,

Civil Township, Rourkela,

Dist.: Sundargarh,

Site Office : At : Unchabali Iron Ore Site,

PO : Bamebari, Dist.: Keonjhar-758034,

Odisha.

…First Party Managements

(AND)

Sri Pancharatna Mahakud, aged about 32 yrs.,

S/o: Duryodhan Mahakud,

Permanent Resident of

At/PO : Badadumuria, Via-Ukhunda,

PS : Baria, Dist.: Keonjhar-758032.

…Second Party Workman

Appearances:

Sri Bishnu Charan Swain,

Asst. Vice President (HR & IR)

Authorised Representative

: For management No.1.

None

: For the management No. 2

Sri Pancharatna Mahakud

: The workman himself

AWARD

This Award is directed against an application preferred U/s.2-A(2) of ID Act (amended Act, 2010),

1947 wherein and whereby the applicant-second party workman has challenged his dismissal.

2.

The case of the applicant-second party workman in short, is that he was initially appointed as

“Despatch Supervisor” w.e.f.1st May, 2008 under the establishment of first party management No.1. The said

management is outsourced by the management No.2 for mining operation in its iron ore mines at Unchhabali,

Keonjhar. He was discharging his duties with all sincerity and devotion. He and other co-workmen formed a

trade union in the name and style of “Tribeni Mazdoor Sabha” in order to secure better service conditions for the

workmen engaged in the establishment of first party management No.1. It is the claim of the applicant-second

party workman that he was elected as President of the said Trade Union and being President of the Union he

used to oppose unfair practices of the administration of the first party management No.1. Being aggrieved with

such union activities of the applicant-second party workman the management No.1 was vindictive towards him.

His wife was suffering from different ailments, for which he applied for leave for medical treatment of his wife

from 3.5.2015 onwards. The leave application was submitted by E-mail. It is alleged by the applicant-second

party workman that the management No.1 adopted an unfair labour practice and issued a transfer order by E-

mail dtd.4.5.2015 directing him to join in another project in the State of Andhra Pradesh by 9.5.2015. Despite

his application for leave on the ground of illness and medical treatment of his wife as well as on the ground of

self illness the first party management No.1 transferred him to the project at Andhra Pradesh deliberately and he

was given a short period to join in his new assignment. When he could not report to his duty, the first party

management No.1 issued a charge sheet without considering his leave application. Enquiring Officer was

appointed with haste and the enquiry was conducted ex-parte in gross violation of principles of natural justice

and such ex-parte enquiry was also prejudicial to his interest as he was not given due opportunity to defend

himself in the departmental enquiry. Even, the management No.1 did not allow him to appear before the medical

board for deciding his fitness when he communicated that he would appear before the medical board being

declared medically fit by his treating Govt. Doctor. As the first party management No.1 was bent upon for his

removal from service, ex-parte enquiry was held and on the findings of Enquiring Officer his service was

terminated w.e.f.20.6.2015 without compliance of a second show cause notice. There was no previous

misconduct or any serious misconduct on his part except his inability to join within a short span of time in the

new place of posting due to self illness and illness of his wife. There was no serious misdeed or misconduct

warranting his dismissal from service. Therefore, according to him the first party management No.1 adopted an

unfair labour practice and vindictively terminated his service by holding an ex-parte departmental enquiry. It is

also asserted by him that the imposed punishment was not also in conformity to the gravity of the alleged

misconduct on his part. So, he raised a dispute before the labour machinery and when the conciliation was failed

before the labour machinery he was issued with a Failure Report of conciliation. Hence, this case.

3.

The first party management No.2 did not appear and contest the claim in spite of service of notice, as a

result of which it has been set ex-parte. The first party management No.1 has contested the claim stating, inter

alia, that the assertions made by the workman in his statement of claim are not correct. The second party

[भाग II— ण् ड 3(ii)]

भारत का रािपत्र : िनवरी 16, 2021/पौष 26, 1942

81

workman was issued with his transfer order on 2.5.2015 and due to exigency of company work and manpower

requirement in its new site project the second party workman was relieved on the same day and directed to

report to his duty on 9.5.2015. He was also offered an amount of Rs.5,000/- from the Time Office to meet his

transit expenses. Despite issuance of his transfer order the applicant refused to receive the same, for which the

transfer order was notified and displayed in the notice board at the working site of the disputant on 2.5.2015.

After issuance of such transfer order the second party workman applied for one month leave on medical ground

through E-mail. As the second party workman refused to receive the transfer order when it was offered to him in

presence of officers, the said order was also issued to him by E-mail on 4.5.2015. It has been asserted by the

first party management No.1 that a copy of his transfer order was sent to the second party workman in his

available address through Regd. Post. The workman also refused to receive the postal letter and did not join in

his new place of posting. Hence, he was again issued with a letter on 14.5.2015 through Regd. Post wherein he

was advised to join at his new place of posting and submit his leave application to the Reporting Officer. As the

second party workman did not comply the direction of the authority, he was issued with a charge sheet on

18.5.2015 under the provisions of sub clauses-(1), (19), (43) and (72) of clause-15 of the Certified Standing

Order of the company. On being accused of wilful insubordination or disobedience of lawful and reasonable

order of superior authority, refusal to accept or take notice of communications meant for him, unauthorized

absence of duty etc., he was called upon to submit his show cause on the charge sheet within 48 hours of receipt

of the charge sheet. According to the first party management No.1 the disputant submitted his explanation on

24.5.2015 and the same being found unsatisfactory it was decided to hold an enquiry. An officer in the rank of

DGM was appointed as Enquiring Officer and an officer of AGM(HR) rank was appointed as the Presenting

Officer. The Enquiring Officer issued notice to the disputant for his appearance before him at KMC Project

Office on 3.6.2015. But, the second party workman informed the Enquiring Officer vide his letter dtd.2.6.2015

that he was unable to attend the enquiry till he is medically fit. On receipt of the reply the workman was directed

to appear before the medical board for his fitness/illness examination. The medical board headed by Dr.

N.C.Kalianan was constituted to examine the disputant on 5.6.2015 at 10 AM in Hi-tech Diagnostic Centre,

Joda. But, the workman did not appear before the medical board despite intimation to him as to the place and

time of sitting of the Board. He was again informed on 6.6.2015 to appear before the Medical Board on

11.6.2015. It is averred by the first party management No.1 that enquiry committee met as per the schedule date

i.e. 3.6.2015. As the workman was found absent, the committee sat on 8.6.2015 and again on 13.6.2015. As the

second party workman was found absent despite prior intimation to him about such sitt ing of enquiry

committee, it was decided to conduct the enquiry ex-parte. In the enquiry, officials of the first party

management No.1 were examined and the documents placed before the enquiry committee, were marked as

Ext.1 to Ext.24. Taking into consideration the materials placed before the enquiry committee finding was

submitted to the Disciplinary authority vide Enquiry Report dtd.13.6.2015. Taking the findings of the Enquiring

Officer into consideration the punishment of termination of service was imposed in the departmental

proceeding. The workman was communicated about his dismissal on a letter dtd.20.6.2015 issued by Regd. Post

with AD. According to the first party management No.1 the enquiry was conducted in conformity to the

provisions of Certified Standing Order of the company and principles of natural justice. All sorts of

opportunities were afforded to the second party workman to defend himself in the departmental enquiry. But, he

did not participate in the enquiry deliberately as well as he did not appear before the medical board since he was

not having any ground or reason for his non-reporting to duty and unauthorized absence from his duty. Since the

Certified Standing Order prescribes punishment of dismissal/removal for unauthorized absence, there was no

disproportionate in imposing the order of removal for the misconduct on the part of the second party workman.

Hence, prayer is made for the rejection of the claim statement of the applicant.

4.

On the pleadings of the parties following issues have been settled for adjudication of the dispute :-

ISSUES

(i)

Whether the departmental enquiry was held in fair and proper manner in conformity to the

provisions of Certified Standing Order of the Company and principles of natural justice?

(ii)

Whether the order of removal of the applicant-second party workman was legal and/or justified?

(iii) If not, what relief the applicant-second party workman is entitled to?

5.

The applicant- second party workman has examined himself as WW No.1 and relied upon documents

like copies of his letter of appointment dtd.01.05.2008, charge sheets dtd.18.5.2015 & 26.5.2015, replies

submitted by him on 24.5.2015 & 02.06.2015, his medical documents, complaint petition dtd.8.7.2015

submitted by him before RLC(C), Rourkela, certificate issued by the RLC(C), Rourkela, application for

registration of Trade Union, his termination order dtd.20.06.2015, information sought under RTI Act by him, his

leave application dtd.04.07.2013, doctor’s prescriptions dtd.04.08.2013, 09.08.2013 & 20.05.2014, outdoor

patient ticket dtd.30.06.2014, his leave application dtd.09.07.2014, doctor’s prescription with the ultrasound

report dtd.15.07.2014, his leave applications dtd.24.12.2014 & 01.02.2015, doctor’s prescription dtd.09.02.2015

with prescription dtd.23.03.2015, his E-mail dtd.02.12.2015, his leave application dtd.23.03.2015, paper

82 THE GAZETTE OF INDIA : JANUARY 16, 2021/PAUSHA 26, 1942

[PART II—SEC. 3(ii)]

clipping “The Samaj” dtd.03.05.2015, paper clipping “The Pragatibadi”, paper clipping “The Sambad” his E-

mail dtd.03.05.2015, letters dtd.02.05.2015, 04.05.2015 of the management No.1 & Regd. Postal Envelop

dtd.05.05.2015 in which the letters sent by it, letter dtd.04.05.2015 and postal envelop dtd.07.05.2015 of the

management No.1, is letter dtd.09.05.2015 with postal receipt, his E-mail dtd.09.05.2015, letter dtd.14.05.2015

of management, his E-mail dtd.18.05.2015, letter dtd.18.05.2015 of management, E-mail dtd.19.05.2015 of

management, his E-mail dtd.24.05.2015, letter dtd.24.05.2015 of the management, his letter dtd.02.06.2015, his

E-mail dtd.02.06.2015, letter dtd.26.05.2015 of the management, letter dtd.28.05.2015 of the management, E-

mail dtd.06.06.2015 of the management, his E-mail dtd.10.06.2015, his letter dtd.10.06.2015 letter

dtd.20.06.2015 of the management and copy of doctor’s prescription which are marked as Exts.1 to 44 to

substantiate his claim, whereas to refute the claim of the applicant, the first management No.1 has examined

three witnesses as MW No.1 to MW No.3 and filed the departmental proceeding file including the letters

allegedly communicated to the applicant- second party workman which are marked as Ext.A to Ext.AA.

It is pertinent to mention that the first party management No.1 agreed for final and simultaneous

hearing of all issues instead of deciding the fairness of departmental enquiry as a preliminary issue, for which

the applicant-second party workman adduced his evidence first instead of the first party management No.1 being

called upon to establish the fairness of the departmental enquiry.

FINDINGS

Issue Nos. I to III

6.

For the sake of convenience all the issues are taken into consideration simultaneously.

No serious dispute is raised by the applicant-workman that he was issued with the letter dtd.18.5.2015

under Ext.2 on a nomenclature/heading charge sheet wherein he is alleged to have committed certain omissions

and commissions which are defined as misconducts under the provisions of sub-clauses-(1), (19), (43) and (72)

of clause-15 of the Certified Standing Order of the Company. The applicant-workman was asked to submit his

explanation within 48 hours of receipt of the charge sheet either through post or E-mail. There is also no serious

dispute that the applicant-workman submitted his explanation vide his letter dtd.24.5.2015 wherein and whereby

he explained to his authority that he had applied for leave on 3.5.2015 due to illness of his wife. The said

explanation having not been accepted by the authority, a departmental enquiry was held. Admittedly, the

enquiry was conducted ex-parte due to non-participation of the applicant-workman in the enquiry. It is the claim

of the applicant-workman that he could not attend the enquiry due to self illness and illness of his wife for which

he expressed his inability to attend the enquiry. As per his intimation dtd.2.6.2015 to the Enquiring Officer he

informed that he can only attend the domestic enquiry when he will be declared fit by his doctor. There is also

no serious dispute to the fact that he was transferred from the project site at Unchhabali Iron Ore Mine to other

project site at Andhra Pradesh and he did not report to his duty in the new place of posting on the date fixed for

his joining as well as till the commencement of the departmental enquiry by submitting an application for leave

on the ground of self illness and illness of his wife. It is also evident from the oral testimony of MW No.1 to

MW No.3 as well as correspondences made between the Disciplinary Authority and the applicant-workman that

he was advised to appear before the Medical Officer for his medical examination on 5.6.2015 as per letter

Ext.M issued on 3.6.2015. But, he did not appear before the medical board. It is also evident from the oral

evidence of the management witnesses as well as Ext.Q that the applicant-workman did not appear before the

medical board, for which another opportunity was given to him for his medical examination on 11.06.2015. The

documents exhibited by the management No.1 as well as oral testimony of MW No.3 reveal that the applicant -

workman did not appear before the medical board held on 11.6.2015. The applicant-workman has not seriously

challenged the above assertions of the management No.1. The only plea of the applicant-workman is that he was

transferred on vindictive ground and asked to join within a short span of time when he applied for leave on

3.5.2015 on the ground of illness of his wife. It is his claim that the transfer order was issued to him subsequent

to his leave application. The departmental enquiry is only an eye wash with a determination to remove him from

service.

Keeping in view the above facts and circumstances emerging from the pleadings and evidence of the

parties it is to be determined whether principles of natural justice or provisions of Certified Standing Order of

the Company in conducting the departmental enquiry were violated by holding an ex-parte enquiry against the

applicant-workman and by removing him without giving him a second show cause notice. As per settled

position of law an enquiry cannot be said to have been properly held unless (i) the employee proceeded against

has been informed clearly of the charges levelled against him, (ii) the witnesses are examined ordinarily in the

presence of employee in respect of the charges, (iii) the employee is given a fair opportunity to cross -examine

witnesses, (iv) he is given a fair opportunity to examine witnesses including himself in his defence if he so

desires and (v) the Enquiring Officer records his findings with reasons for the same in his report basing upon

the materials placed before him in the enquiry. Therefore, the first and foremost principle is that no one should

be condemned unheard. Notice is the first limb of the principles so also the charge which must be precise and

unambiguous, so that it could apprise the party determinatively the case he has to meet. In the absence of a

[भाग II— ण् ड 3(ii)]

भारत का रािपत्र : िनवरी 16, 2021/पौष 26, 1942

83

notice of the kind and such reasonable opportunity the order passed becomes wholly vitiated. Thus, it is must

essential that a party should be put on notice of the case before any adverse order is passed against him.

Coming to the case at hand it is seen from the evidences of the first party management No.1 more

particularly from the correspondences made by the Disciplinary Authority and the Enquiring Officer that the

disputant was required to report his duty in his new place of posting on 9.5.2015 after issuance of transfer as

well as relieve order on 2.5.2015. Though the applicant-workman has alleged that he was issued with the

transfer order on 4.5.2015 when he sent his leave application on 3.5.2015 due to illness of his wife, MW No.1

and MW No.2 have categorically stated in their evidence that the applicant-workman was offered the letter of

his transfer order on 2.5.2015. But, he refused to receive the same. In the transfer order both the witnesses have

given their attestation towards refusal of acceptance on the part of the applicant-workman. There is nothing

adverse in their cross-examination to disbelieve them except the fact that they are subordinates to the

Disciplinary Authority. That apart, the applicant-workman does not dispute his transfer as well as the date of his

joining. He has also not disputed or denied that he was ever directed to appear before the medical board at Joda.

Medical Board was fixed on two occasions i.e. on 5.6.2016 and 11.6.2015 for his medical examination. He did

not attend the board on both the occasions. There is also no reply from him for his non-appearance before the

board. In that view of the matter it cannot be held that his non-reporting to the duty as well as non-appearance

before the Enquiring Officer or non-participation in the Departmental Enquiry was bonafide one. When there is

overwhelming evidence to establish that the transfer order was issued and offered to the applicant-workman on

2.5.2015 and he refused to accept the same, his application for leave on 3.5.2015 is to be accepted subsequent to

his transfer order. When the said leave application is not acted upon by the first party management No.1 and he

was directed to report to his duty and submit his leave application in a new place of posting and again he was

directed to appear before the medical board for his fitness examination, he was expected to comply the

directions or at least available himself before the medical board for his fitness examination. On the other hand, it

is not disputed that he informed the Enquiring Officer that he would attend the enquiry when his physician

would declare him fit.

It has been contended by the applicant-workman that the domestic enquiry cannot be said valid unless

the enquiry is held in presence of the charged officer and statement of the witnesses are recorded in his presence

and he was given an opportunity to cross-examine the witnesses as well as given a scope to advance his

evidence/contention. The departmental enquiry having been conducted in his absence despite his intimation on

his illness and illness of his wife, the same cannot be said a fair enquiry. But, in the case at hand it is apparent

that the disputant was communicated distinctly to report to his duty on 9.5.2015 and on his reply and leave

application he was directed to report in place of new posting and applied for leave. It is also emerging that he

refused to receive his transfer order. He failed to appear before the medical board. Hence, his non-reporting to

duty by refusing to receive the transfer order and applying for leave is undoubtedly covered by omissions and

commissions amounting to misconduct as provided in various sub-clauses of clause-15 of the Certified Standing

Order of the Company. When the applicant-workman failed to appear in the departmental enquiry on a plea of

illness and when he did not appear before the medical board to show his illness it cannot be accepted that he was

not given an opportunity to defend himself in the departmental enquiry. In that situation examination of

witnesses in his absence in the enquiry cannot be said to be illegal or it cannot be held that he was not given

opportunity to cross-examine the witnesses.

It is well settled that in an ex-parte enquiry, if the charges are born out from the documents kept in

normal course of business, no oral evidence is necessary to prove those charges. In such situation

uncontroverted documentary evidence can be sufficient to prove the charges. The reason assigned by him for his

non-attendance in the enquiry is not well founded since he did not attend the medical board fixed by his

authority. His explanation to the charge sheet in the departmental enquiry that he would attend the enquiry when

he will be declared fit by his doctor is itself an unsatisfactory one. No enquiry can be postponed for an indefinite

period. The applicant-workman could have requested for deferring the enquiry for certain period only.

Therefore, bonafide on the part of the applicant-workman for his non-appearance in the departmental enquiry

can be doubted and it cannot be accepted that he was not given due opportunity and there was violation of

principles of natural justice. As per settled position of law that when the delinquent/CO fails to participate in a

departmental enquiry without sufficient reasons and the enquiry was held ex-parte, it cannot be said that due

opportunity was denied to the delinquent/CO. Admittedly, it is emerging from the evidence of the management

No.1 that the enquiry was completed on a single day and report was submitted. But, it cannot be over sighted

that date was fixed for the enquiry on two occasions and it was held on 13.6.2015. When the enquiry was held

ex-parte it cannot be said that the enquiry was conducted and completed in a single day by haste. That the

charges levelled against the applicant-workman was for his unauthorised absence from duty and refusal to

accept the officials’ correspondences. Ex-parte enquiry in respect to such charges can be expected to be

completed within a day. Therefore, it cannot be said that the enquiry report was submitted in haste or the

enquiry was not conducted in a fair manner.

84 THE GAZETTE OF INDIA : JANUARY 16, 2021/PAUSHA 26, 1942

[PART II—SEC. 3(ii)]

The fairness of the departmental enquiry is also challenged on a contention that the workman was not

issued with a second show cause notice and the enquiry report. Undisputedly, the management No.1 does not

claim to have issued second show cause notice before imposing punishment in the departmental proceeding. It

is the stand of the first party management No.1 that Certified Standing Order does not provide for issuance of

second show cause notice in a departmental proceeding. The Certified Standing Order is exhibited in the present

case and it is silent as to issuance of second show cause notice in the departmental proceeding. That apart, it

cannot be overlooked that when the applicant-workman did not participate in the departmental enquiry, non-

supply of the enquiry report cannot be said to have caused prejudiced to him. Therefore, the departmental

enquiry cannot be vitiated on the said ground.

Thrust has been given by the workman that the imposed punishment is highly disproportionate to the

misconduct on his part. There being no previous charge sheet or misconduct on his part, the punishment of

removal is shockingly disproportionate to the allegation raised in the charge sheet. When he had applied for

leave on the ground of self illness and illness of his wife, the punishment of removal is not sustainable in the eye

of law keeping in view the settled principle of Hon’ble Supreme Court in the case between Municipal

Corporation of Greater Bombay Vrs. B.E.S.T Workers’ Union reported in AIR 1973 SC 883. It is also argued

that punishment of removal without furnishing enquiry report more particularly for misconduct of unauthorised

absence is not maintainable in the eye of law since long absenteeism is not an act of moral turpitude or

dishonesty and an order of such dismissal passed on that ground is bad keeping in view the principle set out by

the Hon’ble Apex Court in the case between Mahinder Dutta Sharma Vrs. Union of India reported in

AIR 2014 SC 2009. Admittedly, no material or evidence is emerging in the adjudication to show or suggest

that the workman was ever held guilty in any departmental proceeding or he was charge sheeted earlier. It was a

single instance of misconduct on his part. Further, he was not provided with a copy of the enquiry report or

second show cause notice before the order of his removal on being held guilty of misconduct for his

unauthorised absence. The first party management No.1 did not dispute that the workman submitted a leave

application after his transfer. If the above facts and circumstances are taken into consideration along with the

settled principles of the Hon’ble Apex Court, the punishment of removal of workman for the misconduct of

unauthorised absence or non-reporting to the duty appears to be disproportionate to the gravity of the alleged

misconduct on the part of the applicant-workman. Law is well settled that Industrial Tribunal can interfere in

such situation under the provisions of section 11-A of ID Act and can modify the punishment itself or remit

back the matter to the Disciplinary Authority to review its own decision.

In the facts and circumstances emerging in the adjudication it would not be just and appropriate on the

part of Tribunal to interfere with the punishment imposed by the Disciplinary Authority as it may encourage

indiscipline or defines on the part of the applicant-workman. However, for the interest of justice the punishment

of removal as imposed on the workman is set aside and the matter is remitted back to the Disciplinary Authority

to impose any other lesser punishment than removal as the absenteeism on the part of the workman is a

misconduct of first instance and keeping in view the observation of the Hon’ble Supreme Court in the case

between Mahinder Dutta Sharma Vrs. Union of India reported in AIR 2014 SC 2009 the same is not an act

of moral turpitude and dishonesty and give an opportunity to the workman to join in the work/project to be

assigned by the Appointing Authority within a reasonable period, failing which it (the first party management

No.1) is at liberty to discharge/remove/terminate his service without initiating a further proceeding. Since the

applicant-workman was absent from his duty till he was removed and he did not render any service to the first

party management No.1 after his removal, he is not entitled to any back wages on the principle of “no work no

pay”. The direction as narrated above is to be carried out within a period of one month of the date of publication

of the Award in the official Gazette, failing which the applicant-workman is entitled to interest @ 6.5% on his

last wages drawn by him from the date of notification of the Award.

The application is disposed of accordingly.

Dictated and corrected by me.

B. C. RATH, Presiding Officer

[भाग II— ण् ड 3(ii)]

भारत का रािपत्र : िनवरी 16, 2021/पौष 26, 1942

85

ubZ fnYyh] 11 tuojh] 2021

—vkS|ksfxd fookn vf/kfu;e] 1947 ¼1947 dk 14½ dh /kkjk 17 ds vuqlj.k esa] dsUnzh;

ljdkj esllZ एस.ई.सी.एल. ds izca/kra= ds lac) fu;kstdks vkSj muds deZdkjksa ds chp] vuqca/k esa fufnZ’V

vkS|ksfxd fookn esa dsUnzh; ljdkj vkS|ksfxd vf/kdj.k–सह-Je U;k;ky;] िबलपुर ds iapkV ¼lanHkZ la[;k 22/2017½

dks izdkf'kr djrh gS] tks dsUnzh; ljdkj dks 04-01-2021 dks izkIr gqvk FkkA

[la- ,y-22012@74@2016-vkbZvkj- ¼lh,e-2½]

jktsUnz flag] voj lfpo

New Delhi, 11th January, 2021

S.O. 37.—In pursuance of Section 17 of the Industrial Disputes Act, 1947 (14 of 1947), the Central

Government hereby publishes the Award (Ref. No. 22/2017) of the Cent.Govt.Indus.Tribunal-cum-Labour

Court, Jabalpur as shown in the Annexure, in the industrial dispute between the Management of M/s . S.E.C.L

and their workmen, received by the Central Government on 04.01.2021.

[No. L-22012/74/2016-IR (CM-II)]

RAJENDER SINGH, Under Secy.

ANNEXURE

BEFORE THE CENTRAL GOVERNMENT INDUSTRIAL TRIBUNAL-CUM-LABOUR COURT,

JABALPUR

NO. CGIT/LC/R/22-2017

Present: P. K. Srivastava, H.J.S..( Retd)

The President

Coal India Pensioners Association,

Branch Bishrampur Area,

Quarter No.1B-32, Bishrampur

Surajpur (CG)-497226.

…Workman

Versus

The General Manager

SECL. Bishrampur Area,

PO-Bishrampur Colliery

District Surajpur (CG).

…Management

AWARD

(Passed on this 17th day of December 2020)

1.

As per letter dated 8/3/2017 by the Government of India, Minis try of Labour, New Delhi, the

reference is received. The reference is made to this Tribunal under Section -10 of I.D.Act, 1947 as per

Notification No.L-22012/74/2016-IR(CM-II) The dispute under reference relates to:

“Whether the action on the part of General Manager, Bishrampur Area of SECL in withholding the

terminal benefits viz. settling Allowance, leave encashment and Plrs if any, amount unpaid as per

eligibility after retirement on ground of alleged company quarter retention by Shri Sundar Lal

Gupta, Ex.Driver, Cat-VI is justified, if not, what relief the workman is entitled to? .”

1.

After registering the case on the basis of reference, notices were sent to the parties.

2.

The workman never appeared before the Tribunal inspite of service, hence the case was ordered to

proceed ex-parte against the workman vide order dated 1-1-2020. The Management has filed its written

statement and affidavit of its witnesses which is uncross-examined. The Management has also proved two

documents Exhibit M-1 and Exhibit M-2.

3.

The case of Management is that the workman retired w.e.f from 31-12-2011 but raised a dispute in

the year 2016. There is no relation of workman and employer between the parties, hence the dispute is not an

Industrial Dispute as defined in Section 10 of Industrial Disputes Act,1947. Also it has been pleaded that the

86 THE GAZETTE OF INDIA : JANUARY 16, 2021/PAUSHA 26, 1942

[PART II—SEC. 3(ii)]

workman did not vacate the residential quarter allotted to him during his employment. He did not pay any rent,

water charges, electricity charges or maintenance after retirement. He illegally occupied the accommodation for

which the eviction proceedings were initiated. The workman thereafter vacated the residence on 9-12-2015. He

has been paid Rs.8,70,597 as gratuity. His CMPF and PLRS amount has also been paid. He has been paid

monthly pension. The Management is entitled to recover penal rent and maintenance as well as water and

electricity charges of the premises which was illegally occupied by the workman from the date of his retirement

till the date of its vacation. Accordingly, the Management has prayed that the reference be answered against the

workman.

4.

The Reference is the point in issue in the case in hand.

5.

After perusal of record, in the light of the arguments of Mrs. A.K.Shashi, Learned counsel for the

Management, it comes out that dues of the workman are still not paid is not disclosed by the workman at any

stage.

6.

Reference of Section 2(k) and Section 2(r ) of Industrial Disputes Act,1947 is necessary here, which

is being reproduced as follows:-

2(k) "industrial dispute" means any dispute or difference between employers and employers or

between employers and workmen, or between workmen and workmen, which is connected with

the employment or non-employment or the terms of employment or with the conditions of

labour,of any person.”

2[(r) "Tribunal" means an Industrial Tribunal constituted under section 7A and includes an

Industrial Tribunal constituted before the 10th day of March, 1957, under this Act;]

7.

Admitted by the Management is the case is that the workman has now vacated the accommodation on

9-12-2015, hence the workman will be entitled to any dues which has not yet been paid to him after deducting

the statutory penal rent and other charges due on him for illegally occupying the accommodation. The reference

is required to be answered accordingly.

8.

On the basis of the above discussion, following award is passed:-

A. The action of the management on the part of General Manager, Bishrampur Area of SECL

in withholding the terminal benefits viz. settling Allowance, leave encashment and Plrs if

any, amount unpaid as per eligibility after retirement on ground of alleged company quarter

retention by Shri Sundar Lal Gupta, Ex.Driver, Cat-VI is held not justified.

B. The workman is held entitled to receive any un-paid dues as per law after deducting the

penal rent and other legally admissible charges from the workman by the Management with

reference to illegal occupation of the official residence.

9.

No order as to costs.

10.

Let the copies of the award be sent to the Government of India, Ministry of Labour & Employment as

per rules.

DATE: 17.12.2020

P. K. SRIVASTAVA, Presiding Officer

ubZ fnYyh] 11 tuojh] 2021

—vkS|ksfxd fookn vf/kfu;e] 1947 ¼1947 dk 14½ dh /kkjk 17 ds vuqlj.k esa] dsUnzh;

ljdkj esllZ एस.ई.सी.एल. ds izca/kra= ds lac) fu;kstdks vkSj muds deZdkjksa ds chp] vuqca/k esa fufnZ’V

vkS|ksfxd fookn esa dsUnzh; ljdkj vkS|ksfxd vf/kdj.k&lg&Je U;k;ky;] िबलपुर ds iapkV ¼lanHkZ la[;k

109/2015½ dks izdkf'kr djrh gS] tks dsUnzh; ljdkj dks 04-01-2021 dks izkIr gqvk FkkA

[la- ,y-22012@67@2015-vkbZvkj- ¼lh,e-2½]

jktsUnz flag] voj lfpo

[भाग II— ण् ड 3(ii)]

भारत का रािपत्र : िनवरी 16, 2021/पौष 26, 1942

87

New Delhi, the 11th January, 2021

S.O. 38.—In pursuance of Section 17 of the Industrial Disputes Act, 1947 (14 of 1947), the Central

Government hereby publishes the Award (Ref. No.109/2015) of the Cent.Govt.Indus.Tribunal-cum-Labour

Court, Jabalpur as shown in the Annexure, in the industrial dispute between the Management of M/s . S.E.C.L

and their workmen, received by the Central Government on 04.01.2021.

[No. L-22012/67/2015-IR (CM-II)]

RAJENDER SINGH, Under Secy.

ANNEXURE

BEFORE THE CENTRAL GOVERNMENT INDUSTRIAL TRIBUNAL-CUM-LABOUR COURT,

JABALPUR

NO. CGIT/LC/R/109/2015

Present: P. K. Srivastava, H.J.S..( Retd)

The Vice President

Rashtriya Colliery Mazdoor Congress,

Near Gram Panchayat,

Johilla Area, P.O Naurajabad,

Distriact Umaria (MP)-484555

…Workman

Versus

The Chief Manager,

Johilla Area, SECL,

PO Naurajabad,

District Umaria-484555

…Management

AWARD

(Passed on this 16th day of December 2020)

1.

As per letter dated 15-12-15 by the Government of India, Ministry of Labour, New Delhi, the

reference is received. The reference is made to this Tribunal under Section -10 of I.D.Act, 1947 as per

Notification No.L-22012/67/2015-IR(CM-11) The dispute under reference relates to:

“Whether M/s Anchor Security Services Pvt. Ltd. dwara M/s Anchor Security Services Pvt. Ltd.

Evam Prabhandan Johilla Shetra , SECL ke bech hue anubandh ka purnatah palan na kiya jana

uchhit hai. Yadi Nahi to Kamgaar Surakshakarmi kya anutosh paane ke patra hain, .”

2.

After registering the case on the basis of reference, notices were sent to the parties.

3.

Inspite of sufficient services, none appeared from the side of the workman, hence the case was

ordered to be proceeded ex-parte from the workman side vide order dated 2-1-2020.

4.

The Management filed its written statement of defence through its learned counsel Shri A.K.Shashi

wherein it was pleaded that firstly the reference is vague because the particulars of beneficiaries are not

provided. The dispute is one which relates to contract workers. The contractor is not a party to the reference. It

was further stated that there is no employer/employee relationship between the Management and the claimant,

hence there is no dispute as defined under Section 10 of the Industrial Disputes Act,1947. The Management

Company is a licensed Principal Employer which engages licensed Contractors for certain works which are not

in the category of prohibited contracts in Contract Labour (Regulation & Abolition) Act,1970. The Security

Company mentioned in the reference was engaged for security services within the period 1-9-2013 to 29-2-2016

as they are licensed contractors and the work was of non-prohibited category. Wages of the employees of the

contractor which were engaged by the contractor were paid by the Management Company through their bank

account as per rules. The power of appointment and termination of service of the laborers engaged by the

contractor were with the contractor and the Management had no role to play in this respect. Accordingly, it was

prayed by the Management that reference be answered against the workman. The documentary evidence

Exhibit M-1 to M-13 were filed and proved by the Management through un-cross-examined affidavit of its

witnesses.

5.

The workman side which is Vice President, Rashtriya Colliery , Mazdoor Congress have not appeared

in this case inspite of service as has been stated earlier.

88 THE GAZETTE OF INDIA : JANUARY 16, 2021/PAUSHA 26, 1942

[PART II—SEC. 3(ii)]

6.

Heard arguments of Mr. A.K. Shashi, Learned Counsel for the Management and perused the record as

well. None appeared from the side of the workman.

7.

The Reference is point in issue in the case in hand.

8.

The initial burden to prove its case lies on the party who asserts it. In this case the burden lies on the

workman/Union in which they have utterly failed. Hence the reference is liable to be answered against the

workman/Union.

9.

On the basis of the above discussion, following award is passed:-

A. The action M/s. Anchor Security Services Pvt. Ltd. in not completely following the

agreement drawn between M/s Anchor Security Services and Mangement SECL, Johilla

Area is held to be illegal and unjustified.

B. The workman/Union is held entitled to no relief.

10.

Let the copies of the award be sent to the Government of India, Ministry of Labour & Employment as

per rules.

DATE: 16.12.2020

P. K. SRIVASTAVA, Presiding Officer

ubZ fnYyh] 11 tuojh] 2021

.—vkS|ksfxd fookn vf/kfu;e] 1947 ¼1947 dk 14½ dh /kkjk 17 ds vuqlj.k esa] dsUnzh;

ljdkj esllZ MCY;w-lh-,y- ds izca/kra= ds lac) fu;kstdks vkSj muds deZdkjksa ds chp] vuqca/k esa fufnZ’V vkS|ksfxd

fookn esa dsUnzh; ljdkj vkS|ksfxd vf/kdj.k&lg&Je U;k;ky;] tcyiqj ds iapkV ¼lanHkZ la[;k 25/2015½ dks

izdkf'kr djrh gS] tks dsUnzh; ljdkj dks 04-01-2021 dks izkIr gqvk FkkA

[la- ,y-22012@94@2014-vkbZvkj- ¼lh,e-2½]

jktsUnz flag] voj lfpo

New Delhi, the 11th January, 2021

S.O. 39.—In pursuance of Section 17 of the Industrial Disputes Act, 1947 (14 of 1947), the Central

Government hereby publishes the Award (Ref. No. 25/2015)of the Cent.Govt.Indus.Tribunal-cum-Labour

Court, Jabalpur as shown in the Annexure, in the industrial dispute between the Management of M/s . W.C.L

and their workmen, received by the Central Government on 04.01.2021.

[No. L-22012/94/2014-IR (CM-II)]

RAJENDER SINGH, Under Secy.

ANNEXURE

BEFORE THE CENTRAL GOVERNMENT INDUSTRIAL TRIBUNAL-CUM-LABOUR COURT,

JABALPUR

NO. CGIT/LC/R/25/2015

Present: P. K. Srivastava, H.J.S..( Retd)

The Md.Bismillah

S/o Md. Ismile, Ex-workman

R/o Ghorawari colony,

Mines Quarter No.213,

PS.Damua, Tehsil Junnardev

Chhindwara-480555

…Workman

Versus

The Chief General Manager

Western Coalfields Ltd.Pench Area

P.O. Parasia, Tehsil Parasia

Chhindwara-480441.

The Mines Manager/Superintendent

Ghorawari Colliery

WCL, P.O. Ghorawari.

Tehsil Junnardev

Chhindwara-480555

…Management

[भाग II— ण् ड 3(ii)]

भारत का रािपत्र : िनवरी 16, 2021/पौष 26, 1942

89

AWARD

(Passed on this 17th day of December 2020)

1.

As per letter dated 27/2/2015 by the Government of India, Ministry of Labour, New Delhi, the

reference is received. The reference is made to this Tribunal under Section -10 of I.D.Act, 1947 as per

Notification No.L-22012/94/2014-IR(CM-II)The dispute under reference relates to:

“Kya Mahabrabhandak, Wesetern Coal Fields Limited Kanhan Shetra post Dungariya Tehsil

Junnardev, Jilla Chhindhawara dwara awadek Shri Bismillah, S/o Md. Esmaile, Purv Kamgaar,

Ghorawari Colliery ko unki janm thithi 1.1.1952 ke sthan par 27-2-1947 adhilikhit karna va

tadaunusar 28-1-2007 ko sewanevrit karna nyay sangat hai? Yadi nahi to purv kamgaar kya

anutosh paane ka adhikari hai. .”

2.

After registering the case on the basis of reference, notices were sent to the parties. Parties appeared

and filed their statement of claim in defense.

3.

The case of the workman as stated in his statement of claim is that he was first appointed by the

Management in the year 1973 and his date of birth was recorded as 27-2-1947 and on the basis of this date of

birth which was wrongly recorded by the Management, the workman was retired on 28-2-2007. The workman

while in service, objected against the wrong recording of his date of birth and filed a Writ Petition

No.16245/2006(s) before Hon’ble High Court at Jabalpur which was decided vide order dated 6-11-2012. The

Management was directed by Hon’ble High Court to decide his representation regarding his date of birth and

retirement. According to the Management, he failed to file his High School Certificate before Hon’ble High

court and before the Management. The Management wrongly decided the age representation against him,

holding the date of birth recorded by the Management as correct. The Management did not rely on the

marksheet and character certificate which was an illegality committed by the Management. The workman again

filed a writ petition No.6314/2013 which he was permitted to withdraw on his request and raised a disputed

before the Industrial Tribunal. Thereafter he raised a dispute with the Management after failure of conciliation,

the reference was made by the appropriate Government to this Tribunal. According to the workman, his date of

birth is 1.1.1952 which is recorded in his High School Certificate which was wrongly not accepted by the

Management. Accordingly, the workman has prayed to set aside his retirement and grant him benefits deeming

him to be in continuous service after fixing date of retirement according to his actual date of birth i.e. 1-1-1952.

4.

The case of Management is that the workman disclosed his date of birth as 27-2-1947 at the time of his

initial appointment. He was initially appointed as Tub-loader w.e.f. 31-7-1972, reappointed on 18-4-1975, he

disclosed his date of birth as 27-2-1947 which was recorded in Form-B register which was maintained for this

purpose. He signed and verified the entry in the register in this respect. His date of birth as mentioned above

was also recorded in service register, particulars of family and nomination form as PS3 and PS4 on the basis of

his declaration which was verified by him on his transfer from Sukri Mines to Ghorawari Colliery in which his

date of birth was mentioned as 27-2-1947 in the last pay certificate. Again in the year 1987 when the employees

were directed to furnish the particulars of their family and verify it, he mentioned his date of birth as 27-2-1947.

Till his retirement in the year 2007, he never objected his date of birth in his service record. He raised a dispute

at the fag end of his service.

5.

Further the case of the Management is that Provision of I.I.No.76 will not apply to the case in hand

because there is no variation regarding his date of birth in his service record. The matriculation certificate

which the workman relied at the fag end of his service while raising the dispute was of a date after his joining

the service. He disclosed himself as an illiterate person, so as to secure an unskilled job i.e. Badli Mazdoor

which was meant for illiterate people. Accordingly, he suppressed information while getting the job, thus he

never came in with clear hands in this respect. Also the Management has stated that in the light of the directions

of Hon’ble High Court, the Management decided his representation regarding his date of birth. According to the

management, there is no illegality in not accepting the claim of the workman regarding his date of birth and the

action of retirement taken by the Management on the basis of his recorded date of birth 27-2-1947 is just and

proper. The management has prayed that the reference be answered against the workman.

6.

The workman filed photocopy of documents which were not admitted by Management. The

Management filed documents Exhibit M-1 to M-9 and proved it through oath and cross-examined the statement

of its witness. The workman did not appear for evidence . He did not file any affidavit nor did he prove the

photocopy documents filed by him which were denied by the Management. Due to continuous absence of the

workman during the hearing of case, it was ordered to proceed ex-parte against him.

7.

I have heard arguments of learned Counsel for Management Shri A.K.Shashi. None was present for

the workman. I have also perused the record.

90 THE GAZETTE OF INDIA : JANUARY 16, 2021/PAUSHA 26, 1942

[PART II—SEC. 3(ii)]

8.

The documents produced by Management are Exhibit M-1 to M-9 which establishes that there was a

self-declaration signed by the workman at different stages of service right from the date of joining till retirement

in which he disclosed his date of birth as 27-2-1947. The dispute was first raised by the workman in the year

2006 by way of filing a writ petition, establishes the claim of the Management that the dispute was raised by the

workman at the fag end of his service for the reasons best known to him. Admitted by the workman is the fact

that he did not produce the High School Certificate and transfer certificate at the time of hearing on his

representation, in the light of order of Hon’ble High Court. Before this Tribunal also he has not proved his High

School Certificate and marksheet, hence the case of the workman is held not proved so far as it relates to date of

his birth. On the other hand, the case of Management appears more convincing in this respect.

9.

On the basis of the above discussion, following award is passed:-

A. Holding the claim of the workman not proved, it is held that the action of Management

refusing to incorporate the date of birth of workman as 1-1-1952 in place of 27-2-1947 and

retiring him on 28-2-2007 is held justified in law.

B. The workman is held entitled to no relief.

10.

Let the copies of the award be sent to the Government of India, Ministry of Labour & Employment as

per rules.

DATE: 17-12-2020.

P. K. SRIVASTAVA, Presiding Officer

नई दिल्ली, 13 िनवरी, 2021

का.आ. 40.— केन्री सरकार, कमगचारी राज् बीमा अजिजन म, 1948 (1948 का 34) की िारा 91क

के सा पठ त िारा 88 द्वारा प्रित्त िजि ों का प्र ोग करते हुए, ‎बीईएमएल जलजमटेड के कार ानों/स्ट् ापनाओं के

जन जमत कमगचाठर ों को उि अजिजन म के प्रवतगन से छूट प्रिान करती िज। ि छूट इस अजिसूचना के िारी िोने की

तारी से एक वषग की अवजि के जलए प्रभावी रिेगी।

2.

उि छूट जनम्नजलज त ितों के अिीन िज; अ ागत्:-

(1)

कार ाना/ स्ट् ापना छूट प्राप्त कमगचाठर ों के नाम और पिनाम जवजनदिष्टग करते हुए, कमगचाठर ों का

एक रजिस्ट्टर र ेगी;

(2)

कमगचारी उि अजिजन म के अिीन ऐसी प्रसुजविाएं प्राप्त करते रिेंगे जिनको पाने के जलए वे इस

अजिसूचना द्वारा िी गई छूट के प्रवषत्त िोने की तारी से पूवग संित्त अंििानों के आिार पर िकिार िो

िाते िैं;

(3)

छूट प्राप्त अवजि के जलए, दि कोई अजभिा पिले िी दकए िा चुके िों, तो वे वापस निीं दकए िाएंगे;

(4)

उि कार ाने का जन ोिक उस अवजि की बाबत जिसके िौरान उस कार ाने पर उि अजिजन म

(जिसे इसमें इसके पश्चात उि अवजि किा ग ा िज) प्रवतगन के अध् िीन ा ऐसी जववरजण ां, ऐसे

प्राप प में और ऐसी जवजिजष्ट ों से ुि िोगी िो कमगचारी राज् बीमा (सािारण) जवजन म, 1950 के

अिीन उसे उि अवजि की बाबत िेनी अपेजक्षत िोती ीं;

(5)

जनगम द्वारा उि अजिजन म की िारा 45 की उप िारा (1) के अिीन जन ुि दक ा ग ा कोई

सामाजिक सुरक्षा अजिकारी ा जनगम का इस प्र ोिन के जलए इस जनजमत्त प्राजिकषत कोई अन्

पििारी:-

(i) उि अजिजन म की िारा 44 की उप िारा (1) के अिीन, उि अवजि के जलए प्रस्ट्तुत दकसी

जववरण में अंतर्वगष्ट जवजिष्ट ों को सत् ाजपत करने; ा

[भाग II— ण् ड 3(ii)]

भारत का रािपत्र : िनवरी 16, 2021/पौष 26, 1942

91

(ii) ि अजभजनश्च न के जलए दक कमगचारी राज् बीमा (सािारण) जवजन म, 1950 द्वारा

ाअपेजक्षत रजिस्ट्टर और अजभले उि अवजि के जलए र े ग े े ा निीं; ा

(iii) ि अजभजनश्च न के जलए दक कमगचारी, जन ोिक द्वारा दि े गए उन फा िों को, जिसके

फलस्ट्वप प इस अजिसूचना के अिीन छूट िी िा रिी िज, नकि में और वस्ट्तु प प में पाने का

िकिार िज ा निीं; ा

(iv) ि अजभजनश्च न के जलए दक उस अवजि के िौरान, िब उि कार ाने के संबंि में अजिजन म के

उपबंि प्रवषत्त े, ऐसे दकन्िीं उपबंिों का अनुपालन दक ा ग ा ा ा निीं, जनम्नजलज त का ग

करने के जलए सिि िोगा:-

(क) प्रिान ा आसन्न जन ोिक से अपेक्षा करना दक वि उसे ऐसी िानकारी िे जिसे इस अजिजन म

के प्र ोिन के जलए आवश् क समझता िज ; ा

( ) ऐसे प्रिान ा आसन्न जन ोिक के अजिभोगािीन, दकसी कार ाने, स्ट् ापना, का ागल ा

अन् पठरसर में दकसी भी उजचत सम पर प्रवेि करना और उसके प्रभारी से ि अपेक्षा करना

दक वि कार्मगक के जन ोिन और मििूरी के संिा से संबंजित ऐसे ले ा, बजि ां और अन्

िस्ट्तावेि, ऐसे जनरीक्षक ा अन् पििारी के समक्ष प्रस्ट्तुत करें और उनकी परीक्षा करने िें ा

ऐसी िानकारी िें जिसे वे आवश् क समझते िैं; ा

(ग) प्रिान ा आसन्न जन ोिक की, उसके अजभकताग ा सेवक की, ा ऐसे दकसी व्यजि को, िो

ऐसे कार ाने, स्ट् ापना, का ागल ा अन् पठरसर में पा ा िाए, ि जवश्वास करने का

ुजि ुि कारण िज दक वि कमगचारी िज, परीक्षा करना; ा

(घ) ऐसे कार ाने, स्ट् ापना, का ागल ा अन् पठरसर में र े गए दकसी रजिस्ट्टर, ले ा, बिी

ा अन् िस्ट्तावेि की नकल तज ार करना ा उद्धरण लेना;

(ङ) ाजस्ट् जत अन् िजि ों का प्र ोग करना ।

6.

जवजनवेि ा जनगमीकरण के मामले में, प्रित्त छूट स्ट्वत: रद्द िो िाएगी और तब नए प्रजतष्ठान को छूट के

जलए समुजचत सरकार को आवेिन करना िोगा ।

[सं. एस-38014/06/2020-एस.एस-I]

मिन चौरजसआ, अवर सजचव

New Delhi, the 13th January, 2021

S.O. 40.—In exercise of the powers conferred by section 88 read with section 91 A of the Employees’

State Insurance Act, 1948 (34 of 1948), the Central Government hereby exempts the regular employees of

factories and establishments of BEML Limited from the operation of the said Act. The exemption shall be

effective for a period of one year from the date of issue of this notification.

2.

The exemption is subject to the following conditions namely:-

(1)

the factories and establishments shall maintain a register of the employees specifying the names

and designations of the exempted employees’;

(2)

the employees shall continue to receive such benefits under the said Act to which they would

have been entitled to on the basis of the contribution paid prior to the date from which exemption

granted by this notification operates;

(3)

the contribution for the exempted period, if already paid, shall not be refundable;

92 THE GAZETTE OF INDIA : JANUARY 16, 2021/PAUSHA 26, 1942

[PART II—SEC. 3(ii)]

(4) the employer of the said factory and establishment shall submit in respect of the period during

which that factory was subject to the operation of the said Act (hereinafter referred as the said

period), such returns in such forms and containing such particulars as were due from it in respect

of the said period under the Employees’ State Insurance (General) Regulations, 1950;

(5)

a Social Security Officer appointed by the Corporation under sub-section (1) of section 45 of the

said Act or other official of the Corporation authorised in this behalf by it, shall, for the purpose

of :—

(i)

verifying the particulars contained in any return submitted under sub-section (1) of

section 44 of the said Act for the said period; or

(ii)

ascertaining whether registers and records were maintained as required by the

Employees’ State Insurance (General) Regulations, 1950 for the said period; or

(iii)

ascertaining whether the employees continue to be entitled to benefits provided by the

employer in cash and kind being benefits in consideration of which exemption is being

granted under this notification; or

(iv)

ascertaining whether any of the provisions of the Act had been complied with during the

period when such provisions were in force in relation to the said factory and

establishment to be empowered to :—

(a)

require the principal or immediate employer to him such information as he may

consider necessary for the purpose of this Act; or

(b)

at any reasonable time enter any factory, establishment, office or other

premises occupied by such principal or immediate employer at any reasonable

time and require any person found in charge thereof to produce to such

inspector or other official and allow him to examine accounts, books and other

documents relating to the employment of personal and payment of wages or to

furnish to him such information as he may consider necessary; or

(c)

examine the principal or immediate employer, his agent or servant, or any

person found in such factory, establishment, office or other premises or any

person whom the said inspector or other official has reasonable cause to

believe to have been an employee ; or

(d)

make copies of or take extracts from any register, account book or other

document maintained in such factory, establishment, office or other premises,

(e)

exercise such other powers as may be specified.

(6) in case of disinvestment or corporatisation, the exemption granted shall stand cancelled and then the new

entity may apply to the appropriate Government for exemption.

[No. S-38014/06/2020-SS-I]

MADAN CHAURASIA, Under Secy.

Uploaded by Dte. of Printing at Government of India Press, Ring Road, Mayapuri, New Delhi-110064

and Published by the Controller of Publications, Delhi-110054.

SURENDER

MAHADASAM

Digitally signed by SURENDER

MAHADASAM

Date: 2021.01.21 17:22:06 +05'30'