“ârkÂàçy qàçйþ §çý ¡Âmªàêm »þà§ý Îàä̧ý §çý
qÞkãuÂà §íýtàÞ§ý
ÂàªàÀ säªàmàÂà (ârÂàà »þà§ý â¹þ§ý¹þ) §çý Zàçx½à
“²þ¾mãyªàð¼þ/Àäªàê/09/2013
-
2015.”
Ñçmä ¡Âàätm. §íýtàÞ§ý kã.2
-
22
-
²þ¾mãyªàð¼þ
ªàk¹þ
/
38
ây.
yç.
âsvà¢ê.
âÀÂààÞ§ý
30
-
05
-
2001.”
²þ¾mãyªàð¼þ ÊàkqØà
(¡yàoàʽà)
Zààâo§ýàÊ yç Zà§ýàâÎàm
§íýtàÞ§ý
5
63
]
Êàuqä
Ê, yàçt
wàÊ, âÀÂààÞ§ý 16
¡¨¹åþrÊ
2023
¡âÎwÂà 24
, Îà§ý 1945
ÅtkZ foHkkx
ea=ky;] egkunh Hkou] uok jk;iqj vVy uxj
NRrhlx<+ jkT; fo|qr fu;ked vk;ksx
flapkbZ dkWyksuh] 'kkafr uxj] jk;iqj
jk;iqj] fnukad 6 vDVwcj 2023
vf/klwpuk
Øekad 106@lh,lbZvkjlh@2023-⸺ fo|qr vf/kfu;e] 2003 ¼2003 dk 36½ dh /kkjk 181 lgifBr /kkjk
42] 61] 66] 86 ds rgr fufgr 'kfä;ksa rFkk blfufeRr blds leFkZdkjh vU; lHkh 'kfä;ksa dks iz;ksx easa ykrs gq,]
NÙkhlx<+ jkT; fo|qr fu;ked vk;ksx ¼vk;ksx½ ds }kjk] NÙkhlx<+ jkT; fo|qr fu;ked vk;ksx ¼fxzM baVj,fDVo
forfjr uohdj.kh; ÅtkZ lzksr½ fofu;e] 2019 ¼blesa blds i’pkr~ lh,lbZvkjlh MhvkjbZ fofu;e 2019 ;k ewy
fofu;e ds :i esa fufnZ"V gS½ cuk;k x;k] rFkk jkT; esa forfjr lkSj ÅtkZ ifj;kstukvksa ds fy, fucaZ/kuksa vkSj 'krksaZ
dks fufnZ"V djus ds fy, bldk igyk] la'kks/ku fd;k x;kA
vk;ksx ds vkns'k ls
gLrk-@&
¼,l-ih-'kqDyk½
lfpo-
Raipur, the 6th October 2023
NOTIFICATION
No. 106/CSERC/2023.⸺ ln exercise of powers vested under Section 42, 61, 66, 86 read with Section 181 of
the Electricity Act 2003 (36 of 2003) and all other powers enabling it in this behalf, the Chhattisgarh State Electricity
Regulatory Commission (the Commission) made Chhattisgarh State Electricity Regulatory Commission (Grid lnteractive
Distributed Renewable Energy Sources) Regulations, 2019 (henceforth, CSERC DRE Regulations 2019 or the Principal
Regulations) and its first amendment for specifying the terms and conditions for distributed solar power projects in the
State.
In pursuance of the Principal Regulations and its subsequent amendment, the Commission hereby makes the following
regulations to amend the Principal Regulations.
1.
Short Title and Commencement
1.1
These Regulations shall be called Chhattisgarh State Electricity Regulatory Commission (Grid Interactive
Distributed Renewable Energy Sources) (Second Amendment) Regulations, 2023.
1.2
These Regulations shall come into force fromSeptember 01, 2023.
2.
New definition c(a) for regulation 2: Definitions & Interpretations
New definition c)(a) shall be added after definition 2.1(c) of the Principal regulations, namely:-
c)(a) “Banking Cycle” will be same as the financial year.
3.
New definition h(a) for regulation 2: Definitions & Interpretations
New definition h)(a) shall be added after definition 2.1(h) of the Principal regulations, namely:-
h)(a)
“Green energy” means the electrical energy from renewable sources of energy including hydro and
storage (if the storage uses renewable energy) or any other technology as may be notified by the
Government of India from time to time and shall also include any mechanism that utilises green
energy to replace fossil fuels including production of green hydrogen or green ammonia as per
provision of clause G of sub-rule (2) of rule 4 of Green Energy Open Access Rules, 2022.
4.
New Sub regulation 7.3 for regulation 7
New sub regulation 7.3 shall be added for regulation 7 of the Principal regulations, namely:-
7.3
The distribution licensee shall give green certificate on yearly basis to the consumers, captive
users and other distribution licensees for the green energy supplied by the licensee to
consumers, captive users and other distribution licensees respectively on their request beyond
the renewable purchase obligation of the respective entities.
5.
New Sub regulation 7.4 for regulation 7
New sub regulation 7.4 shall be added for regulation 7 of the Principal regulations, namely:-
7.4
Any consumer having contract demand or sanctioned load of 100 kW or more either through single
connection or through multiple connections aggregating 100 kW or more located in same electricity
division of a distribution licensee, except for captive user(s), whether obligated or not may elect to
generate, purchase and consume renewable energy as per their requirements by requisition from
distribution licensee.
Notwithstanding anything contained in any code or regulations framed under the Electricity Act 2003,
solar generating plants of installed capacity upto 500 kW shall be exempted from requirements of
dedicated feeders and installation of RTU, main and check ABT meter. Also, all such solar generating
plants coming under the KUSUM Scheme can install upto 2000 kW at 11 KV supply voltage and
such solar plants shall be exempted from requirements of dedicated feeder connectivity and
installation of RTU, main and check ABT meter.
(a)
Any consumer as specified in para 7.4 above except for captive user, whether obligated or
not may elect to purchase green energy either upto a certain percentage of the consumption
or its entire consumption and they may place a requisition for this with their distribution
licensee, which shall procure such quantity of green energy and supply it and the consumer
shall have the flexibility to give separate requisition for solar and non-solar;
(b)
The consumer as specified in para 7.4 above except for captive user, may purchase on a
voluntary basis, more renewable energy, than he is obligated to do and for ease of
implementation, this may be in steps of twentyfive per cent and going uptohundred per cent;
(c)
The tariff for the green energy shall be determined separately by the Commission, which
shall comprise of the average pooled power purchase cost of the renewable energy, cross-
subsidy charges if any, and service charges covering the prudent cost of the distribution
licensee for providing the green energy;
(d)
Any requisition for green energy from a distribution licensee shall be for a minimum period
of one year;
(e)
The quantum of green energy shall be pre-specified for at least one year;
(f)
The green energy purchased from distribution licensee or from renewable energy sources
other than distribution licensee in excess of renewable purchase obligation of obligated
entity in any financial year shall be considered for meeting the RPO for the next financial
year by the obligated entity.
6.
Substitution of first proviso of sub regulation a) of 18.2 of regulation 18
For first proviso of sub regulation a) of regulation 18.2 the CSERC DRE Regulations (First Amendment) 2021,
the following sub regulation shall be substituted, namely:-
Provided that the minimum size of distributed renewable energy system that has been set up upto 31st
August 2023 under this arrangement shall be 500 kW. Further, maximum size of such remotely located
distributed renewable energy system, seeking wheeling/transmission of energy to its captive load or
open access consumers, which has been set up under this arrangement shall be two and half times (2.5
times) of the contracted demand or desired open access quantum from the licensee, as the case may be.
Further, that the minimum size of distributed renewable energy system for upcoming IDRES projects
(other than IDRES projects for first 500 MW or projects which have achieved COD by 27.12.2023, whichever
is earlier)under this arrangement shall be 100 kW either through single connection or through multiple
connections aggregating 100 kW or more in same electricity division of distribution licensee. Also,
there shall not be any capacity limit for installation of distributed renewable energy system, seeking
wheeling/transmission of energy for its captive use or open access consumers.
7.
Substitution of regulation 21 of the first amendment regulation
For regulation21of theCSERC DRE Regulations (First Amendment) 2021, the following sub regulation shall
be substituted, namely:-
21.
Banking and Charges to be levied for Open Access
Charges
IDRES projects for first 500 MW
or projects which have achieved
COD by 27.12.2023, whichever is
earlier.
Upcoming IDRES projects (other than
IDRES projects for first 500 MW or projects
which have achieved COD by 27.12.2023,
whichever is earlier.)
21.1
Transmission
Charges
Nil for the entire useful life of the
IDRES Projects.
Transmission charges shall be as specified in
the tariff order applicable from time to time.
21.2
Wheeling
Charges
Nil for the entire useful life of the
IDRES Projects.
Wheeling charges shall be as specified in the
tariff order applicable from time to time.
21.3
Cross Subsidy
Surcharges
Nil for the entire useful life of the
IDRES Projects.
As specified in the tariff order applicable from
time to time. Green energy open access
consumer purchasing green energy, from a
generating plant using renewable energy
sources shall not be increased, during 12 years
from date of operating of generating plant using
renewable energy sources.
21.4
Fees
and
Charges
of
SLDC
Nil for the entire useful life of the
IDRES Projects.
As specified in the tariff order applicable from
time to time.
21.5
Standby
Charges
As specified in the applicable
tariff order.
125% of the energy charges applicable to the
consumer tariff category as specified in the
tariff order.
21.6
Banking
and
Banking
Charges
i. Banking facility will be available
for useful life period of the
project.
ii. Banking of 100% of energy
injection,
after
netting
the
generation
with
in-house
auxiliary requirement, shall be
permitted for all captive and open
access consumption.
i. Banking facility will be available for useful
life period of the project.
ii. Banking shall be permitted at least on
monthly basis on payment of charges to
compensate additional cost for all captive
and open access consumption. Permitted
quantum of banked energy by the green
energy open access consumers shall be at
least 30% of the total monthly consumption
Charges
IDRES projects for first 500 MW
or projects which have achieved
COD by 27.12.2023, whichever is
earlier.
Upcoming IDRES projects (other than
IDRES projects for first 500 MW or projects
which have achieved COD by 27.12.2023,
whichever is earlier.)
iii. Banking charges @ 2% of
banked energy shall be payable in
kind. The banking year shall be
from April to March.
iv. Banked units redeemed during
normal period (5 am to 6 pm or
as specified in the applicable
Tariff Order) and off-peak load
period (11 pm to 5 am next day
or as specified in the applicable
Tariff Order) shall not have any
withdrawal
charges.
Banked
energy redeemed during evening
peak load period (6 pm to 11 pm
or as specified in the applicable
Tariff Order) shall attract peak
withdrawal charges in kind,
which shall be 30% of energy
drawn during the peak load hrs.
v. For captive use/ third party sale,
energy injected into the grid from
the date of synchronization till the
open access approval date will be
considered as deemed energy
banked. For the purpose of this
provision,
the
date
of
synchronization
shall
be
considered as date of commercial
operation (COD).
vi. The
unutilized
banked
energy/surplus energy, if any, at
the end of financial year shall be
purchased by distribution licensee
at lowest rooftop solar tariff
discovered through competitive
bidding
undertaken
by
distribution licensee in the last
financial year. If such tariff is
not
available,
lowest
tariffthroughcompetitive
bidding undertaken by SECI in
last financial year shall be
considered.
vii. For
Sale
to
distribution
licensee, energy injected into
of electricity from the distribution licensee
by the consumers.
Provided that the credit for the banked
energy shall not be permitted to be carried
forward to subsequent banking cycles and
shall be adjusted during the same banking
cycle.
iii. Banking charges @ 2% of banked energy
shall be payable in kind. The banking year
shall be from April to March.
iv. Banked units redeemed during normal
period (5 am to 6 pm or as specified in the
applicable Tariff Order) and off-peak load
period (11 pm to 5 am next day or as
specified in the applicable Tariff Order)
shall not have any withdrawal charges.
Banked energy redeemed during evening
peak load period (6 pm to 11 pm or as
specified in the applicable Tariff Order)
shall attract peak withdrawal charges in
kind, which shall be 30% of energy drawn
during the peak load hrs.
v. For captive use/ third party sale, energy
injected into the grid from the date of
synchronization
till
the
open
access
approval date will be considered as deemed
energy banked. For the purpose of this
provision, the date of synchronization shall
be considered as date of commercial
operation (COD).
vi. The unutilized banked energy/ surplus
energy, if any, at the end of each
banking cycle shall be considered
lapsed and energy generating station
shall be entitled to get renewable
energy certificates to the extent of
lapsed energy.
vii. For Sale to distribution licensee, energy
injected into the gridfrom date of
Charges
IDRES projects for first 500 MW
or projects which have achieved
COD by 27.12.2023, whichever is
earlier.
Upcoming IDRES projects (other than
IDRES projects for first 500 MW or projects
which have achieved COD by 27.12.2023,
whichever is earlier.)
the
gridfrom
date
of
synchronization
to
Commercial Operation Date
(COD) will be purchased by
the distribution licensee at the
first year tariff of the project,
as per the provisions of the
PPA with distribution licensee.
synchronization
to
Commercial
Operation Date (COD) will be purchased
by the distribution licensee at the first
year tariff of the project, as per the
provisions of the PPA with distribution
licensee.
21.7
Deviation
Settlement
Charges
i. All solar power projects shall be
awarded
must-run
status
i.e.,
injection from the solar power
projects shall be considered as
deemed to be scheduled.
ii. Notwithstanding
anything
contained in any regulation framed
under the Electricity Act 2003, all
IDRES projects shall not be
subjected
to
scheduling
and
deviation
settlement
for
commercial purpose. However, for
grid operations scheduling shall be
applicable.
i. All solar power projects shall be awarded
must-run status i.e., injection from the solar
power projects shall be considered as
deemed to be scheduled.
ii. Notwithstanding anything contained in any
regulation framed under the Electricity Act
2003, all IDRES projects shall not be
subjected to scheduling and deviation
settlement
for
commercial
purpose.
However, for grid operations scheduling
shall be applicable.
21.8
Additional
Surcharge
Nil
It will not be applicable for green energy open
access consumers if fixed charges are being paid
by such a consumer.
21.9
CSPDCL will be the nodal agency to monitor and display of solar capacity addition. This information will be
displayed in CSPDCL in its portal. Status of capacity addition of solar projects will be updated fortnightly.
21.10
These provisions for IDRES projects for first 500 MW or projects which have achieved COD by 27.12.2023,
whichever is earlier, shall be applicable for billing cycle starting September 01, 2023.
21.11
Order dated 18.04.2022 issued in P No. 61 of 2020 shall only be applicable for IDRES projects for first 500
MW or projects which have achieved COD by 27.12.2023, whichever is earlier.
By the Order of the Commission
Sd/-
(S. P. Shukla)
Secretary.