4851 DG/2024

(1)

रजिस्ट्री सं. डी.एल.- 33002/99 REGD. No. D. L.-33002/99

xxxGIDHxxx

xxxGIDExxx

असाधारण

EXTRAORDINARY

प्राजधकार से प्रकाजित

PUBLISHED BY AUTHORITY

भाग III

PART III

राष्ट्रीय रािधानी राज्य क्षेत्र दिल्ली सरकार

GOVERNMENT OF THE NATIONAL CAPITAL TERRITORY OF DELHI

दिल्ली जिद्युत जिजनयामक आयोग

अजधसूचना

दिल् ली, 2 अगस्ट्त, 2024

3(629)/टैररफ-इंिी/

/ 2020-21/6910/808-—fnYyh fo|qr fofu;ked vk;ksx,

fo|qr vf/kfu;e] 2003 ¼2003 dk vf/kfu;e 36½ dh /kkjk 61¼p½ vkSj /kkjk 86 ¼1½ ¼bZ½ ds lkFk ifBr /kkjk 181] fnYyh

fo|qr fofu;ked vk;ksx ¼MhbZvkjlh½ us MhbZvkjlh ¼uohdj.kh; ÅtkZ ds fy, usV ehVfjax ½ fofu;e 2014 ds fofu;e 16

ds varxZr iznÙk 'kfä;ka vkSj bl fufer lkeFkZ;dkjh lHkh vU; lHkh 'kfDr;ksa dk iz;ksx djrs gq,, ,rn}kjk fnYyh fo|qr

fofu;ked vk;ksx ¼uohdj.kh; ÅtkZ ds fy, usV ehVfjax ½ fofu;e 2014 ¼blds ckn Þewy fofu;eksa ds :i esa lanfHkZrß½

dks la'kksf/kr djus gsrq fuEufyf[kr fofu;eu cukrk gS] vFkkZr%~&%

¼1½ bu fofu;eksa dk laf{kIr uke fnYyh fo|qr fofu;ked vk;ksx ¼uohdj.kh; ÅtkZ ds fy, usV ehVfjax ½ ¼çFke

la'kks/ku½ fofu;e 2024 gS A

सं. 06]

दिल्ली, िुक्रिार, अगस्ट्त 2, 2024/ श्रािण 11, 1946

[रा.रा.रा.क्षे.दि. सं. 147

No. 06]

DELHI, FRIDAY , AUGUST 2, 2024/ SHRAVANA 11, 1946

[N. C. T. D. No. 147

भारत सरकार

GOVERNMENT OF INDIA

एस.जी.-डी.एल.-अ.-05082024-256058

SG-DL-E-05082024-256058

2

DELHI GAZETTE : EXTRAORDINARY

PART III]

¼2½ ;s fofu;e jkti= esa çdk'ku dh rkjh[k ls ço`Ùk gksaxsA

2-1 ewy fofu;eksa ds fofu;e 5 ds mi&fofu;e ¼3½ esa fuEukuqlkj u, çko/kku esa tksM+k tk,xk %

Þc'krsZ fd 10 fdyksokV rd dh uohdj.kh; ÅtkZ ç.kkyh dh rduhdh laHkkO;rk dks leku vkiwfrZ çdkj ¼oksYVst Lrj& 1

ih,p] 3 ih,p]] vkfn½ ij rduhdh laHkkO;rk v/;;u ls NwV nh xbZ gS vkSj miHkksäk ds Loh—r Hkkj esa dksbZ Hkh

vkuqikfrd o`f)] tSlk fd vko';d gks] forj.k ykblsal/kkjh }kjk fd;k tk,xkA

c'krsZ fd 10 fdyksokV rd dh uohdj.kh; ÅtkZ ç.kkyh dh laLFkkiu dh lqfo/kk çnku djus ds fy, MhVh {kerk

lfgr forj.k volajpuk esa dksbZ mUu;u] forj.k ykblsal/kkjh }kjk fd;k tk,xk vkSj vk;ksx }kjk foosdiw.kZ tkap ds v/khu

dqy jktLo vko';drk ¼,vkjvkj½ esa ikl थ्रू ds :i esa vuqefr nh tk,xh A

c'krsZ fd 10 fdyksokV ls Åij dh uohdj.kh; ÅtkZ ç.kkyh dh rduhdh laHkkO;rk dks forj.k ykblsal/kkjh }kjk

vkosnu çkIr gksus dh rkjh[k ls iaæg ¼15½ fnuksa ds Hkhrj lHkh igyqvksa esa iwjk fd;k tk,xkA

jk"Vªh; jkt/kkuh {ks= fnYyh ds mijkT;iky

ds vkns'k ls rFkk muds uke ij]

सजचि

DELHI ELECTRICITY REGULATORY COMMISSION

NOTIFICATION

Delhi, the 2nd August, 2024

Delhi Electricity Regulatory Commission (Net Metering for Renewable Energy) (First Amendment)

Regulations, 2024

No. F. F3(629)/Tariff-Engg./DERC/2020-21/6910/808.—The Delhi Electricity Regulatory Commission, in

exercise of the powers conferred under Section 181 read with Section 61(h), Section 86 (1) (e) of the Electricity Act,

2003, Regulation 16 of DERC (Net Metering for Renewable Energy) Regulations, 2014 and all other powers enabling

it in this behalf, hereby amends the following Regulation in DERC (Net Metering for Renewable Energy) Regulations,

2014 (hereinafter referred to as “the Principal Regulations”):

1.0 Short Title and Commencement:

(1) These Regulations may be called the Delhi Electricity Regulatory Commission (Net Metering for Renewable

Energy) (First Amendment) Regulations, 2024.

(2) These Regulations shall come into force from the date of their publication in the official Gazette.

2.0 Addition in Regulation 5 (3) of Principal Regulations:

2.1

New provisos added to Sub-regulation (3) of Regulation 5 of the Principal Regulations as under:

“Provided that the Technical feasibility of Renewable Energy System upto 10 kW is exempted from technical

feasibility studies on the same supply type (Voltage level- 1ph,3ph, etc.) and any commensurate enhancement

of Sanctioned Load of the consumer, as may be required, shall be carried out by Distribution Licensee.

Provided further that any upgradation in Distribution Infrastructure including DT capacity to

facilitate the installation of Renewable Energy System upto 10 kW shall be carried out by Distribution

[PART III

DELHI GAZETTE : EXTRAORDINARY

3

Licensee and shall be allowed as pass through in Aggregate Revenue Requirement (ARR) subject to prudence

check by the Commission.

Provided also that Technical feasibility of Renewable Energy System above 10 kW shall be

completed by Distribution Licensee within fifteen (15) days from the date of receipt of application complete

in all aspects.”

By Order and in The Name of Lt. Governor

National Capital Territory of Delhi

RAJESH DANGI, Secretary

Uploaded by Dte. of Printing at Government of India Press, Ring Road, Mayapuri, New Delhi-110064

and Published by the Controller of Publications, Delhi-110054.

GORAKHA

NATH YADAVA

Digitally signed by GORAKHA

NATH YADAVA

Date: 2024.08.05 16:32:56 +05'30'