General Review

uohu ,oa uohdj.kh; ÅtkZ foHkkx] gfj;k.kk dh okf"kZd iz’kklfud fjiksVZ o"kZ 2016&2017 dh leh{kkA

fnukad 4 Qjojh] 2019

Øekad% Mhå,uåvkjåbZå@2019@600.— o"kZ ds nkSjku foHkkx }kjk jkT; esa fofHkUu uohdj.kh; ÅtkZ lzksrksa rFkk

mtkZ laj{k.k dks yksdfiz; cukus ds fy;s] lkSj QksVksoksfYVd dk;ZØe] lkSj rkih; dk;ZØe] laLFkkxr ck;ksxSl dk;ZØe rFkk

ck;ksekl bR;kfn fØ;kfUor fd, x,A

foHkkx ds dqy deZpkfj;ksa dh la[;k 152 gSA ftlesa ls 115 in Hkjs gq, gSa rFkk 37 in fjDr gSa A

foHkkx ds fofHkUu dk;ZØeksa dks fØ;kfUor djus ij ctV 'kh"kZ 2810& ikjEifjd ÅtkZ lzksr ds vUrxZr jkT;

vkorhZ ;kstuk o xSj vkorhZ ;kstuk ls 1356-14 yk[k :Ik;s o 'kh"kZ 3425&xzkeh.k mtkZ dk;ZØe jkT; ;kstuk ,oa xSj

;kstuk ds vUrxZr 529-34 yk[k :Ik;s dh /ku jkf’k O;; dh xbZA

1-

Ukohu ,oa uohdj.kh; ÅtkZ foHkkx dh iz’kklfud O;oLFkk A

o"kZ ds nkSjku foHkkx dh iz’kklfud O;oLFkk ij ctV 'kh"kZ 2810 o 3425 jkT; vkorhZ ;kstuk ,oa xSj&;kstuk ls

851-77 yk[k :i;s dh jkf’k O;; dh xbZ A

2-

uhfr;k¡ ,oa vf/klwpuk,sa

(i)

vfuok;Z ÅtkZ ys[kkijh{kk vkSj blds fØ;kUo;u ij vf/klwpukA

gfj;k.kk ljdkj dh vf/klwpuk la[;k 19/21/2016 -5P fnukad 09 uoacj 2016 ds ek/;e ÅtkZ laj{k.k

vf/kfu;e 2001 ds rgr ÅtkZ n{krk C;wjks ¼chbZbZ½] Hkkjr ljdkj }kjk lwfpr fd, x, ukfer fctyh miHkksäkvksa ds

fy,] 1 esxkokV ls vf/kd Hkkj okys miHkksäkvksa vkSj okf.kfT;d Hkouksa ds fy, e‚y] vLirky] Iyktk vkfn /

laLFkkxr Hkou / ljdkj Hkouksa lfgr uxj fuxe bekjrksa] ty vkiwfrZ foHkkxksa dh fofHkUu Jsf.k;ksa ftudh vuqca/k

ekax 100 fdyksokV ;k mlls vf/kd ;k 120 dsoh, ;k mlls vf/kd Hkkj gS muds fy, ÅtkZ ys[kk ijh{kk vkSj

blds dk;kZUo;u dks vfuok;Z fd;k x;kA

SUPPLT. TO HARYANA GOVT. GAZ., MAR. 5, 2019 (PHGN. 14, 1940 SAKA)

29

(ii)

ykbV ,fefVax Mk;ksM+ (,ybZMh) ySai@V;wc ykbV vkSj ÅtkZ dq’ky ykbVksa ds vfuok;Z mi;ksx ij

vf/klwpukA

gfj;k.kk ljdkj dh vf/klwpuk la[;k 22/52/2005&,lih fnukad 29-06-2016 ds ek/;e ls] ljdkjh {ks= /

ljdkjh lgk;rk çkIr {ks= / cksMZ vkSj fuxe ;k gfj;k.kk ds Lok;Ùk fudk;ksa ds fy, lk/kkj.k ySaiksa dk mi;ksx o

ubZ lksfM;e ok"i ySai dh [kjhn dks çfrcaf/kr dj fn;k x;k gSA ykbV ,fefVax Mk;ksM+ ¼,ybZMh½ ykbVksa dk

mi;ksx lHkh u, dsaæh; o jkT; ljdkj ds dk;kZy;ksa vkSj lkoZtfud {ks= ds miØe laLFkkuksa o gfj;k.kk jkT; esa

fLFkr çfr"Bkuksa o 30 fdyksokV ;k blls vf/kd Hkkj okys vkS|ksfxd] okf.kfT;d vkSj laLFkkxr {ks=ksa ds fctyh

miHkksäkvksa ds fy, vfuok;Z fd;k x;kA

3- eSxkokV iSekus ij fo|qr ifj;kstuk,sa

o"kZ ds nkSjku jkT; esa 12 eSxkokV {kerk ds tehu vk/kkfjr lkSj fo|qr IykaV ikuhir FkeZy ikoj IykaV] ikuhir]

eSaå vYVhesV lu flLVe izk- fy-] Hkk[kjh ftyk egsUnzx<+ o eSaå lqHkk"k bUÝk bft- izk- fy- [kVksVh ftyk egsUnzx<+ esa yxk;s

x;s gSA ekpZ] 2017 rd jkT; esa dqy 29-80 eSxkokV ds tehu ls tqM+s gq,s lkSj fo|qr IykaV LFkkfir fd;s x;s ftlesa ls

24-8 es-ok- ds IykaV vkjihvks ds vUrxZr yxk, x,A

4-

vU; lkSj QksVksoksfYVd dk;ZØe

?kjsyw midj.k tSls ykbZfaVx] ia[ks vkSj NksVs okf.kkfT;d midj.k tSls dEiwVj bR;kfn dh ÅtkZ dh ekax dks iwjk

djus ds fy,s fctyh mRiknu ds fy,s lkSj ÅtkZ dk ykHkizn bLrseky fd;k tk ldrk gSA

(i)

lkSj ikoj IykaV dk;ZØe

o"kZ ds nkSjku jkT; esa uohu ,oa uohdj.kh; ÅtkZ ea=ky;] Hkkjr ljdkj dh 13-70 yk[k :Ik;s dh dsUnzh;

fofRr; lgk;rk rFkk jkT; ljdkj dh 3-90 yk[k :Ik;s dh foRrh; lgk;rk ls 52-5 fdyksokV ds 6 lksyj ikoj

IykaV LFkkfir fd;s x;s A

jkT; esa dqy 35 es- ok- {kerk ds Nr vk/kkfjr ikoj IykaV vuqnku ij yxk, x, gSa vkSj jkT; esa ekpZ]

2017 rd dqy {kerk ds 7 es- ok- {kerk ds IykaV fcuk vuqnku ij yxk, x,A

(ii)

lksyj bUojVj pktZj

bl o"kZ ds nkSjku 3738 lksyj bUojVj pktZj ykHkkfFkZ;ksa dks jkT; ljdkj ds vuqnku ij forfjr fd;s x;sA

300 okV ds flLVe ij 6000@&:- o 500 okVk ds flLVe ij 10000@& :- dk vuqnku fn;k x;kA bl izdkj]

bl Ldhe ds vUrxZr 289-80 yk[k :Ik;s dh vuqnku jkf’k [kpZ dh xbZA

(iii)

lkSj ÅtkZ pkfyr iEi

o"kZ 2016&17 esa 750 lkSj ÅtkZ pkfyr iEi yxkus dk y{; fu/kkZfjr fd;k Fkk ftlesa ls 150 iEi (2 HP

surface type)] 150 iEi (2 HP submersible type)] o 450 iEi (5 HP submersible) yxk;s x;sA ;g iEi fdlkuksa

dks 90 izfr’kr vuqnku ij miyC/k djok, x, Fks ftu ij 9-88 djksM+ :- Hkkjr ljdkj] 13-52 djksM+ :- jkT;

ljdkj }kjk vuqnku fn;k x;kA

5-

lkSj rkih; ÅtkZ dk;Zdze

;g foHkkx lkekftd {ks= ds laLFkkuksa vkSj ?kjsyw vuqiz;ksxksa esa lkSj ty rkiu la;a= yxkus ds fy,s c<+kok ns jgk

gSA lkekftd {ks= ds laLFkkuksa esa 50 izfr’kr foRrh; lgk;rk iznku dh tkrh gS vkSj ?kjsyw mi;ksx esa QySV IysV dysDVj

okyk la;a= yxokus ij 5000@&:- izfr oxZ ehVj dh nj ls vf/kdre 6 oxZ ehVj rd o 2000@&:- izfr oxZ ehVj

dh nj ls vf/kdre 4-5 oxZ ehVj rd ,okdqosfVM V;wc dysDVj yxokus ij fofRr; lgk;rk nh tkrh gSA

o"kZ ds nkSjku, lkekftd {ks= ds vUrxZr 3 laLFkkuksa esa 5000 fyVj izfrfnu {kerk ds lkSj xhtj 4-46 yk[k :Ik;s

dh fofRr; lgk;rk ls yxk, x,A jkT; vuqnku }kjk 11-36 yk[k :Ik;s dh fofRr; lgk;rk ls 24600 yhVj izfrfnu

{kerk ds 157 ?kjks esa lkSj ty rkiu la;a= yxk, x;sA

6-

ck;ksekl dk;ZØe

ck;ksekl ds iz;ksx ds fy, gjsMk }kjk fuEufyf[kr dk;ZØeksa dks c<+kok fn;k tk jgk gS%&

(i)

ck;ksekl fctyh ifj;kstuk,asa

o"kZ ds nkSjku xkao [kqjkork ftyk egsUnzx<+ ,oa xkao /kkuk ukjlu] ftyk fHkokuh+ esa dqy 19-4 eSok- {kerk

dh nks ifj;kstukvksa ls lqpk: :ik ls fo|qr mRiknu pkyw dh xbZA bl ifj;kstuk ls iSnk dh xbZ fctyh jkT;

dh fxzM esa nh tk jgh gSA

SUPPLT. TO HARYANA GOVT. GAZ., MAR. 5, 2019 (PHGN. 14, 1940 SAKA)

30

(ii)

ck;ksekl lg&mRiknu ifj;kstuk,sa

o"kZ ds nkSjku 1-2 esxkokV dh ,d ck;ksekl lg&mRiknu ifj;kstuk uohu ,oa uohdj.kh; ÅtkZ ea=ky;]

Hkkjr ljdkj dh 24-00 yk[k :i;s dh dsUnzh; foRrh; lgk;rk ls eSltZ fr:ifr cklerh ,DliksVZ izkåfyå]

dqM+d rjkoM+h] ftyk djuky esa LFkkfir dh xbZA

(iii) ck;ksekl xSlhQk;j dk;ZØe

o"kZ ds nkSjku eSltZ DokfyVh VSdesd izk- fy-] fyokliqj] lksuhir us viuh vko’;drk dh rkih; ÅtkZ ds

mRiknu ds fy, ,d 0-33 esxkokV (rkih;) {kerk dk ,d xSlhQk;j 50-11 yk[k :Ik;s dh ykxr ls LFkkfir fd;k

ftl ij 6-6 yk[k :- dh dsUnzh; fofRr; lgk;rk nh xbZA

(iv)

[kksbZ vk/kkfjr lg&mRiknu

o"kZ 2016&17 ds nkSjku] eSltZ ukjk;.kx<+ phuh fey] ukjk;.kx<+] vEckyk ds lkFk [kksbZ vk/kkfjr

lg&mRiknu ifj;kstuk dk dk;Z vfUre pj.k ij Fkk A

7- y?kq ty fo|qr mRiknd la;a=

foRrh; o"kZ 2016&17 ds vUr rd dksbZ Hkh y?kq fo|qr mRiknd l;a= jkT; esa ugha yxk;k x;kA jkT; esa 73-30

eSxkokV {kerk ds lafpr 9 y?kq ty fo|qr ifj;kstuk,sa yxkbZ xbZ A

8- laLFkkxr ck;ksxSl dk;ZØe

foHkkx] gfj;k.kk dh xkS’kkykvksa] Msjh laLFkkuksa esa tgk¡ izpqj ek=k esa xkscj miyC/k gks] ;g Ldhe fØ;kfUor dj jgk

gSA laLFkkxr ck;ksxSl la;a= dks c<+kok nsus gsrw jkT; ljdkj la;a= dh dqy ykxr 40 izfr’kr rd forh; lgk;rk iznku

dj jgh gSaA

o"kZ ds nkSjku 2 laLFkkxr ck;ksxSl la;a= dqy 170 D;wfcd ehVj {kerk ds yxk, x, ftl ij 5-90 yk[k :i;s

jkT; vuqnku jkf’k ds :i fn, x, A

9- ÅtkZ laj{k.k dk;ZØe

jkT; esa ÅtkZ laj{k.k mik;ksa ds ek/;e ls lky ds nkSjku yxHkx 413-6 esxko‚V mRiknu {kerk dk cpko fad;k

x;kA gfj;k.kk ljdkj dh vf/klwpuk la[;k 19/21/2016 -5P fnukad 09 uoacj] 2016 ds ek/;e ÅtkZ laj{k.k vf/kfu;e

2001 ds rgr ÅtkZ n{krk C;wjks ¼chbZbZ½] Hkkjr ljdkj }kjk lwfpr fd, x, ukfer miHkksäkvksa ds fy,] 1 esxkokV ls

vf/kd lEcU/k Hkkj okys miHkksäkvksa vkSj okf.kfT;d Hkouksa e‚y] vLirky] Iyktk vkfn / laLFkkxr Hkou / ljdkj Hkouksa

lfgr uxj fuxe bekjrksa] ty vkiwfrZ foHkkxksa dh fofHkUu Jsf.k;ksa ftudh vuqca/k ekax 100 fdyksokV ;k mlls vf/kd ;k

120 dsoh, ;k mlls vf/kd lEcU/k Hkkj gS muds fy, ÅtkZ ys[kk ijh{kk vkSj blds fØ;kUo;u dks vfuok;Z fd;k x;k gSA

blds vykok] gfj;k.kk ljdkj dh vf/klwpuk la[;k 22/52/2005&,lih fnukad 29-06-2016 ds ek/;e ls] ljdkjh

{ks= / ljdkjh lgk;rk çkIr {ks= / cksMZ vkSj fuxe ;k gfj;k.kk ds Lok;Ùk fudk;ksa ds fy, lk/kkj.k ySaiksa dk mi;ksx o ubZ

lksfM;e ok"i ySai dh [kjhn dks çfrcaf/kr dj fn;k x;k gSA ykbV ,fefVax M+k;ksM+ ¼,ybZMh½ ykbVksa dk mi;ksx lHkh

u, dsaæh; o jkT; ljdkj ds dk;kZy;ksa vkSj lkoZtfud {ks= ds miØe laLFkkuksa o gfj;k.kk jkT; esa fLFkr çfr"Bkuksa o

30 fdyksokV ;k blls vf/kd Hkkj okys vkS|ksfxd] okf.kfT;d vkSj laLFkkxr {ks=ksa ds fctyh miHkksäkvksa ds fy, vfuok;Z

dj fn;k x;k gSA

10-

lwpuk izkS|ksfxdh ;kstuk

lwpuk izkS|ksfxdh uhfr ds rgr dk;kZy; esa lwpk: dk;Z ds fy, dEiwVj rFkk vUk lkQVos;j dks c<+kok fn;k tkuk

gS ftlds QyLo:Ik ftyk dk;kZy;ksa rFkk eq[;ky; esa fofHkUu ifj;kstukvksa@dk;ZØeksa ls lEcfU/kr lwpuk@MkVk tYnh ls

LFkkukUrj.k fd;k tk ldsA

o"kZ 2016&17 esa lwpuk izkS|ksfxdh ;kstuk ds vUrxZr 20-19 yk[k :Ik;s dh jkf’k lwpuk izkS|ksfxdh xfrfof/k;ksa dks

c<+kok nsus [kpZ dh xbZA foHkkx dh osclkbZV fu;fer :Ik ls viMsV dh xbZA foHkkx us VS.Mjksa ds fy;s bZ&VS.Mfjax

viukbZ gSA

11-

ÅtkZ dq’ky Hkou dk;ZØe

;g foHkkx fufeZr Hkouksa ,oa muds vkijs’ku esa ÅtkZ cpr ds fy,s ÅtkZ dq’ky Hkou fMtkbu dks c<+kok ns jgk gSA

gjsMk esa ,d bZlh-ch-lh- lSy LFkkfir dh xbZ gS tks lEcfU/kr i{kksa dks bZ-lh-ch-lh- ds vuq:Ik Hkou fuekZ.k ds fy;s

rduhdh lgk;rk iznku dj jgh gSA

SUPPLT. TO HARYANA GOVT. GAZ., MAR. 5, 2019 (PHGN. 14, 1940 SAKA)

31

12-

izpkj ,oa tkx:drk dk;ZØe

o"kZ ds nkSjku izpkj ,oa tkx:drk dk;ZØe ds vUrxZr 4-78 yk[k :Ik;s dh /ku jkf’k fofHkUu xfrfof/k;k¡ tSls

foKkiu] dk;Z’kkyk rFkk lSfeukj vkfn ds fy,s O;; dh xbZA A

13-

pkSdlh foHkkx dks Hksth xbZ f’kdk;rksa lEcU/kh

fjiksZVk/khu vof/k ds nkSjku bl foHkkx ds fdlh vf/kdkjh@deZpkjh ds fo:) tk¡ap@f’kdk;r pkSdlh foHkkx esa

yfEcr ugha FkhA

f=yksd pUn xqIrk]

p.Mhx<+%

vfrfjDr eq[; lfpo] gfj;k.kk ljdkj]

fnukad 18 tuojh] 2019

uohu ,oa uohdj.kh ÅtkZ foHkkxA

REVIEW OF ANNUAL ADMINISTRATIVE REPORT OF NEW & RENEWABLE ENERGY

DEPARTMENT, HARYANA FOR THE YEAR 2016-17.

The 4th February, 2019

No. DNRE/2019/600.— During the year, for popularizing the applications of various non-conventional energy

sources in the State, Solar Photovoltaic Programme, Solar Thermal Programme, Institutional Biogas Programme and

Biomass Programme etc. were taken up for implementation by the Department.

The Department has total staff strength of 152, out of which 115 posts are filled up and 37 posts remained

vacant.

To implement various programmes of the Department, an expenditure of Rs. 1356.14 lacs was incurred under

the budget head “2810-Non-Conventional Sources of Energy, Plan / Non-Plan and budget head “3425-Rural Energy

Programme State Plan & Non-Plan, an expenditure of Rs. 529.34 lacs was incurred.

1.

ADMINISTRATIVE SET UP OF DEPARTMENT OF NEW & RENEWABLE ENERGY, HARYANA

To meet the expenditure of administrative set up of Department and HAREDA, under the budget head 2810-

Plan & Non-Plan and 3425 Plan & Non-Plan an expenditure of Rs. 851.77 lacs was incurred.

2.

POLICIES AND NOTIFICATIONS

(i) Notification on Mandatory Energy Audit and its implementation

Energy audit and its implementation have been made mandatory for various categories of electricity

consumers namely; for Designated Consumers as notified by Bureau of Energy Efficiency (BEE), GoI,

Consumers having connected load above 1 MW; and for Commercial Buildings including Malls, Hospitals,

Plazas etc. / Institutional Buildings / Govt. buildings including municipal buildings, water supply departments

having connected load of 100 kW or above or contract demand of 120 kVA or above under Energy

Conservation Act 2001 vide Haryana Government notification ref. no. 19/21/2016-5P dated 09th November, 2016.

(ii)

Notification on Mandatory use of Light Emitting Diode (LED) lamps/ tube lights and energy

efficient lighting.

Vide Haryana Govt. notification ref. no. No. 22/52/2005-SP dated 29.06.2016, the use of incandescent

lamps and purchase of new sodium vapor lamps was banned for Government Sector/ Government Aided

Sector/ Boards and Corporation or Autonomous bodies of Haryana. The use of Light Emitting Diode (LED)

lamps/ lights made mandatory for all new Central or State Government Offices and Public Sector Undertaking

Institutions or establishments located in the State of Haryana; and for electricity Consumers in Industrial,

Commercial and Institutional sectors having connected load of 30 kilowatt or above.

3.

SOLAR POWER PLANT OF MW SCALE

During the year, Ground Mounted Solar Power Plants of 12 MW capacity have been installed at Panipat

Thermal Power Plant, Panipat; M/s Ultimate Sun Systems (P) Ltd., Bhakhri (Mahendergarh) and M/s Subhash Infra

Engineers (P) Ltd., Khatoti (Mahendergarh) in the State.

Upto March, 2017, 29.8 MW Ground Mounted Solar Power Plant have been installed out of which 24.80 MW

is under RPO in the State.

SUPPLT. TO HARYANA GOVT. GAZ., MAR. 5, 2019 (PHGN. 14, 1940 SAKA)

32

4.

OTHER SOLAR PHOTOVOLTAIC PROGRAMMES

Solar Energy can be used gainfully for power generation for meeting the energy demand for domestic

applications like lighting, fans and also for small commercial applications like computers etc.

(i) Solar Power Plants Programme

During the year, 6 solar power plants of 52.50 kW capacity were installed in the State with CFA of

Rs. 13.70 lac from the MNRE, GoI and State subsidy of Rs. 3.90 lacs.

During this year Grid Connected Rooftop Solar Power Plants of aggregated capacity of 7 MW have

been installed in the State by providing subsidy. Total aggregated capacity of 35 MW have been installed in

the State with and without subsidy upto March, 2017.

(ii)

Solar Inverter Charger Programme

During the year, 3738 Solar Inverter Chargers were provided to the beneficiaries with State subsidy of

Rs. 6000/- per system of 300 watt and Rs. 10,000/- per system of 500 watt. Thus, under the scheme subsidy

amount of Rs. 289.80 lacs was provided to the beneficiaries.

(iii)

Solar Water Pumping System.

During the year 2016-17, target to installed 750 solar water pumping system was fixed. Out of these

750 pumps, 150 nos. of system were of 2 HP (surface type), 150 nos. of 2 HP (submersible type) and 450 HP

nos. were of 5 HP (submersible). These pumps were provided to the farmers with 90% subsidy.

For these 750 pumps, subsidy amounting to Rs. 9.88 crore (Govt. of India) and 13.62 crore (State) was

provided.

5.

SOLAR THERMAL ENERGY PROGRAMME

Under this category, the Department is promoting installation of Solar Water Heating Systems in Social

Sector institutions and for domestic applications. For Social Sector institutions 50% financial assistance was provided

and for domestic applications, financial assistance @ of Rs. 5000/-per Sq. Meter of the collector area subject to max.

6 sq. meter for Flat Plate Collector (FPC) and Rs. 2000/- per sq. meter subject max. 4.5 sq. meter for Evacuated Tube

Collector (ETC) .

During the year, Solar Water Heaters of 5000 LPD capacity were installed in social sector institutions with the

financial assistance of Rs. 4.46 lacs. In Domestic Sector, Solar Water Heating Systems were installed of 24600 LPD

capacity at 157 houses with financial assistance of Rs. 11.36 lacs state subsidy.

6. BIOMASS PROGRAMME

HAREDA is promoting following schemes to utilize the surplus biomass available in the State:-

(i)

Biomass Power Projects

During the year, two projects of 19.4 MW capacity were in operation at Village-Khurawata, District

Mohindergarh and Dhana Narsar, District Bhiwani. The power generated from the project is being fed to the

State grid.

(ii)

Biomass Cogeneration Projects

During the year, a biomass cogeneration project of 1.2 MW was commissioned at M/s Pirupati Basmati

Exports Pvt. Ltd., Village Kurak, Taraori District Karnal with a Central Financial Assistance @ Rs. 24.00 lacs

from Ministry of New & Renewable Energy, Govt. of India.

(iii)

Biomass Gasifier Programme

During the year, a biomass gasifier project of 0.33 MW capacity was installed at M/s Kawality

Techmech Pvt. Ltd., Likwaspur, Sonepat with a cost of Rs. 50.11 lacs thermal application with a Central

Financial Assistance of Rs. 6.60 lacs.

(iv)

Bagasse Cogeneration

During 2016-17, the work on execution of 25 MW bagasse cogen project at M/s Naraingarh Sugar

Mills Ltd., Naraingarh, Ambala is at final stages.

SUPPLT. TO HARYANA GOVT. GAZ., MAR. 5, 2019 (PHGN. 14, 1940 SAKA)

33

7.

SMALL HYDRO POWER PORJECTS

No small hydro power project was commissioned during the year 2016-17. The total 9 small hydro projects of

73.30 MW capacity stands commissioned in the State at the end of financial year.

8. INSTITUTIONAL BIOGAS PLANTS PROGRAMME

In Haryana, Department is implementing this scheme by installing institutional Biogas Plants in Goshala’s,

dairies, institutions having sufficient dung. To promote the installation of IBP’s, State Govt. is providing financial

assistance @ 40% of the plant cost.

During the year 2016-17, 2 institutional biogas plants of 170 Cu.M. total capacity were set up for which State

subsidy amounting to Rs. 5.90 lac was provided.

9.

ENERGY CONSERVATION PROGRAMME

During the year, Energy audit and its implementation have been made mandatory for various categories of

electricity consumers namely; for Designated Consumers as notified by Bureau of Energy Efficiency (BEE), Govt. of

India, Consumers having connected load above 1 MW; and for Commercial Buildings including Malls, Hospitals,

Plazas etc./Institutional Buildings/Govt. building including municipal buildings, water supply departments having

connected load of 100 kW or above or contract demand of 120 kVA or above under Energy Conservation Act, 2001

vide Haryana Govt. notification ref. No.19/21/2016-5P dated 9th November, 2016.

Further, vide Haryana Govt. notification ref. No. 22/52/2005-SP dated 29.06.2017, the use of incandescent

lamps and purchase of new sodium vapor lamps was banned for Government Sector/ Government Aided Sector/

Boards and Corporation or Autonomous bodies of Haryana. The use of Light Emitting Diode (LED) lamps/ lights

made mandatory for all new Central or State Government Offices and Public Sector Undertaking Institutions or

establishments located in the State of Haryana; and for electricity Consumers in Industrial, Commercial and

Institutional sectors having connected load of 30 kilowatt or above.

10.

IT PLAN

Under the information technology policy, making use of computers and application software in the office and

day to day working for smooth governance is to be promoted, accordingly to improve the implementation of various

schemes/programmes being implemented by head office and district offices and to speed up the transformation of

data/information among the district offices, the department is implementing IT Plan.

During the year 2016-17, a grant of Rs. 20.19 lacs was incurred under State IT Plan for promoting of IT

activities in the Department. Also, the website of the Department was updated regularly. The department adopting

e-tendering for its tenders.

11.

ENERGY EFFICIENT BUILDING DESIGN

The Department is promoting Energy Efficient Building Design in the State to save energy in buildings

construction and their operations. An ECBC cell was set up in HAREDA to provide technical assistance to stakholder

for construction of ECBC complint buildings in the State. During the year, an amount of Rs. 28.61 has been utilized

under the programme.

12. PUBLICITY & AWARENESS PROGRAMME

Under Publicity and awareness programme, during the year, an amount of Rs. 46.27 lacs was utilized for

various activities like press advertisements, workshop and seminar etc.

13.

INFORMATION REGARDING COMPLAINTS WITH THE VIGILANCE DEPARTMENT.

No complaint against the officers/officials of the Department is pending with the Vigilance Department for the

period of the report under consideration.

TRILOK CHAND GUPTA,

Chandigarh:

Addl. Chief Secretary to Government of Haryana,

The 18th January, 2019

New & Renewable Energy Department.

56915—C.S.—H.G.P., Chd.