(2826)
Haryana Government Gazette
EXTRAORDINARY
Published by Authority
© Govt. of Haryana
No. 134–2019/Ext.] CHANDIGARH, WEDNESDAY, AUGUST 7, 2019 (SRAVANA 16, 1941 SAKA)
HARYANA GOVERNMENT
INFORMATION TECHNOLOGY, ELECTRONICS & COMMUNICATION DEPARTMENT
Notification
The 7th August, 2019
No. Admn/368/1SIT/9487.— The Governor of Haryana is pleased to make partial modifications/amendments
in the Appendix 2 – ‘schedule of charges’ of Communication & Connectivity Infrastructure Policy 2017 issued
by this Department vide notification no. Admn/368/1SIT/7337 dated 24th August, 2018. Accordingly, amended
Appendix–2 is attached herewith.
ANKUR GUPTA,
Principal Secretary to Government Haryana,
Information Technology,
Electronics & Communication Department.
HARYANA GOVT. GAZ. (EXTRA.), AUG. 7, 2019 (SRVN. 16, 1941 SAKA)
2827
Appendix - 2
Schedule of Charges
1.
Reference has been made in this Schedule to different parts of the state situated in different zones. The areas
forming part of each zone are given below for the purposes of clarity. The description of said zones may
change over time, as notified by the Town & Country Planning Department of the state of Haryana.
Hyper Potential Zone High Potential Zone
Medium Potential
Low Potential
Other areas
Urban Areas in and
around Gurugram
town including the
Urban Areas declared
by the
Government for
Gurgaon- Manesar
Urban complex
Faridabad- Ballabgarh
Complex, Panchkula,
Kalka, Pinjore,
GwalPahari-Balola
Bandhwari Complex in
Gurgaon District,
Sonepat-Kundli Urban
Complex, Panipat.
Karnal, Kurukshetra,
Ambala City, Ambala
Cantt., Yamuna Nagar,
Bahadurgarh,
Jagadhari, Hisar,
Rohtak, Ganaur ,
Palwal, Hodal, Rewari,
Dharuhera- Bawal and
Oil Refinery Panipat.
All other urban
areas in the
State.
Rest of the state
areas including all
rural areas
2.
Application fee and other charges:
2.1
Processing Fee:
(A) One time Administrative charges ( Non Refundable)
Areas of the State
Sr.
No.
Purpose
Hyper
Potential
Zone
High
Potential
Zone
Medium
Potential
Zone
Low
Potential
Zone
Other Area
including the
rural areas
1
Laying of Underground
communication and
connectivity Infrastructure
(per meter)
1/- per Mtr
2
Setting up of overhead
communication and
connectivity Infrastructure
10,000/-
2.2
Right of Use/Right of Way charges:-
The charges for grant of license for the communication infrastructure shall be payable at the rates given
in table B below. These charges shall be payable annually for a period of twenty years or the period of
license, whichever is earlier. The applicant would be required to pay such charges afresh on completion
of the period of initial license/or on completion of a period of twenty years, whichever is earlier, at the
rates applicable at such time. The applicant if, desire can deposit one-time charges as per the table
below to twenty times of such full annual charges.
Charges for license to Right of Way/ Right of Use (in Rs.)
B
Annual Charges for Right of Way/Right of Use (in Rs.)
Areas of the State
Sr. No.
Purpose
Hyper
Potential
Zone
High
Potential
Zone
Medium
Potential
Zone
Low
Potential
Zone
Other Area
including the
rural areas
1
For every Pit dug-
up, other than a
man-hole with
spacing of 100 mtrs.
centre to centre (in
square meter)
Annual rent of 10% of the collector rates with size of 1m x 1m x 1.5m
deep with 100 m centre to centre.
2828
HARYANA GOVT. GAZ. (EXTRA.), AUG. 7, 2019 (SRVN. 16, 1941 SAKA)
2
Dish Antenna (other
than dish antenna
installed under
DTH)
Rs. 5,000/- per dish antenna
3
For every pole
erected/existing to
lay overhead
communication
cables/cable TV
(per pole)
i.
1000/- for new pole
ii.
500/- for existing poles
4
Erection of Ground
Based Mast/Roof
Top Mast (per site)
10,000/-
5,000/-
5
Erection of mobile/
communication
towers (per site)
15,000/-
5,000/-
6
Moveable
communication
towers mounted on
vehicles (per such
tower for three
month)
20,000/-
15,000/-
5,000/-
2.2.1 In case of each Wi-Fi antenna or Micro Cell unit/antenna with utility box attached to
Cell/antenna are installed on any land or building including bus shelters, street light pole
and public places, annual charges of Rs. 1000/- shall be deposited by the Applicant to the
Appropriate Authority.
2.2.2 The Applicant shall deposit application fee and other charges as specified under Para 2 of
Appendix 2 in respect of lands and buildings of Central/State Government or statutory or non-
statutory bodies/institutions in the State of Haryana as well as private land/building.
2.2.3 In the case of lands and buildings belonging to Central Government or statutory or non-statutory
bodies/institutions of the Central Government, rates of annual charges as may be determined by
the Central Government, shall be deposited by the Applicant with the concerned Department of
Central Government or statutory or non-statutory bodies/institutions, as the case may be.
2.2.4 Restoration charges in the shape of bank guarantee for laying underground OFC to the
Appropriate Authority shall be submitted as mentioned in Para 2.3 of Appendix 2.
2.2.5 No fee and charges shall be recovered from the Government Departments for establishing
Telecommunication system including towers/poles for their use.
2.2.6 The Appropriate Authority shall not charge any other amount except the application fee and
other charges specified as above.
2.3
Performance Bank Guarantee (PBG):
The applicant shall furnish a refundable Performance Bank Guarantee (PBG) towards security for
restoration of the sites dug/ used in the process of execution of works. The BG shall be valid for a
period of six months over and above the completion period and would have to be renewed accordingly
in the event of grant of extension of execution period. The competent authority shall discharge the BG
on satisfactory restoration of the area. The PBG shall be furnished at the following rates:
Performance Bank Guarantee against restoration works (Rs. per route meter)
Performance Bank
Guarantee
Cement
Concrete
Roads/
Pavements
Cement
Concrete
Paver
Blocks
Metalled
Roads/
Pavements
Unpaved
(Kutcha)
Roads/ Rastas
Others
1
Micro Trenching
Method
50/-
50/-
30/-
NA
20/-
HARYANA GOVT. GAZ. (EXTRA.), AUG. 7, 2019 (SRVN. 16, 1941 SAKA)
2829
2
Horizontal
Directional Drilling
Method/ Horizontal
Boring Method
100/-
100/-
100/-
100/-
100/-
3
Open Digging
Method
Not Allowed Not Allowed Not Allowed 500/-
2.3.1 The amount for performance Bank Guarantee against restoration shall be reviewed every five
years.
2.3.2 In case of time-over runs for completion of the works, the Bank Guarantee shall be renewed/ got
extended by the Applicant corresponding to the revised completion period + 6months. The
Applicant shall obtain formal permission for time-extension from the competent authority.
2.3.3 The Applicant shall report satisfactory completion of restoration of related work sites, which
shall be visited/ ascertained by a representative of the State Government Department/ Agency
within a period of 15 days of such report. Thereafter, the Bank Guarantee shall be discharged to
the Applicant within 15 days from the date of inspection thereof or 30 days of submission of the
request subject to such restoration works having been carried out to the satisfaction of the said
authority.
2.3.4 The Applicant may provide the PBG, as applicable for a stretch over which the work is proposed
to be undertaken and roll the same over to each of the subsequent stretches, subject to the
validity of such PBG for the period of execution + 6 months.
2.3.5 In case the work contemplated by the Applicant is not completed to the satisfaction of the
concerned Government Department/ Statutory Authority/ State Agency granting the permission,
the Competent Authority may extend the completion period as deemed appropriate, along with
extension in Bank Guarantee. Where the Applicant fails to meet his performance obligations in
this behalf within the agreed time-frame, the Competent Authority may en-cash the Bank
Guarantee and undertake restoration of the site on its own at the risk and cost of the Applicant.
57265—C.S.—H.G.P., Chd.