(402)
Haryana Government Gazette
Published by Authority
© Govt. of Haryana
No. 46-2019] CHANDIGARH, TUESDAY, NOVEMBER 12, 2019 (KARTIKA 21, 1941 SAKA)
PART III
Notifications by High Court, Advertisement, Notices and Change of Name etc.
HARYANA ELECTRICITY REGULATORY COMMISSION
Bays No. 33-36, Sector-4, Panchkula-134112, Haryana
Notification
The 31st October, 2019
Regulation No. HERC/46/2019.— The Haryana Electricity Regulatory Commission, in exercise of the
powers conferred on it by section 181 of the Electricity Act 2003 (Act 36 of 2003) and all other powers enabling it in
this behalf, after previous publication, hereby frames the following Regulations: -
PART - I PRELIMINARY
1.
SHORT TITLE, COMMENCEMENT, EXTENT, AND INTERPRETATION
1.1
These Regulations shall be called the Haryana Electricity Regulatory Commission (Terms and
Conditions for Determination of Tariff for Generation, Transmission, Wheeling and Distribution &
Retail Supply under Multi Year Tariff Framework) Regulations, 2019.
1.2
These Regulations shall come into force with effect from 1st April, 2020 and shall, unless otherwise
directed by the Commission, remain in force up to 31st March, 2025 for the duration of second control
period.
1.3
These Regulations shall extend to the whole of the State of Haryana.
2.
SCOPE OF APPLICATION
2.1
These Regulations shall be applicable to all existing and future Generating Companies, Transmission
Licensees / SLDC and Distribution Licensees and their successors/assignees, if any, and shall apply
where the Commission determines: -
(i)
tariff for supply of electricity by a generating company to a distribution licensee under section
62 and 64 of the Act;
(ii)
tariff for intrastate transmission of electricity by a transmission licensee to a distribution licensee
or to open access consumers under section 62 and 64 of the Act;
(iii)
State Load Dispatch Centre (SLDC) fees and charges under section 32(3) of the Act;
(iv)
tariff for wheeling, distribution & retail supply of electricity by a distribution licensee under
Section 62 and 64 of the Act;
(v)
tariff in all other cases where the Commission has the jurisdiction for tariff determination; and
(vi)
Cross-subsidy Surcharge in addition to the charges for wheeling under the first proviso to sub-
section (2) of section 42 of the Act, in accordance with the Open Access Regulations.
PART III]
HARYANA GOVT. GAZ., NOV. 12, 2019 (KRTK. 21, 1941 SAKA)
403
(vii)
Additional Surcharge in addition to the charges for wheeling under sub-section (4) of section 42
of the Act, read with the HERC Open Access Regulations, to meet the stranded fixed cost of
such distribution licensee arising out of its universal obligation to supply.
2.2
In case the tariff has been determined through transparent process of tariff based competitive bidding in
accordance with the guidelines issued by the Central Government as per Section 63 of the Electricity
Act, 2003, the Commission shall adopt such tariff in accordance with the provisions of the Act;
2.3
These Regulations shall not apply for tariff determination of renewable energy generation projects. The
tariff for such generation projects shall be determined as per Haryana Electricity Regulatory
Commission (Terms & Conditions for determination of Tariff from Renewable Energy Sources,
Renewable Purchase Obligation and Renewable Energy Certificate) Regulations, 2017 as amended
from time to time.
3.
DEFINITIONS AND INTERPRETATION
3.1
“Act” means the Electricity Act, 2003 (36 of 2003) as amended from time to time;
3.2
“Accounting Statement” for the purpose of these Regulations, shall include: -
(i)
Balance sheet / profit and loss statement prepared in accordance with the relevant schedule of
the Companies Act in vogue including as may be required under any other Regulations notified
by the Commission;
(ii)
Cash flow / fund flow statement in line with the relevant Accounting Standards of the Institute
of Chartered Accountants of India;
(iii)
Report of the Statutory Auditors,
(iv)
Cost Accounting Records, wherever applicable, as prescribed under Section 209(1)(d) of the
Companies Act in vogue.
3.3
“additional capitalization means the capital expenditure actually incurred or projected to be incurred
after the date of commercial operation of the project, up to the cut-off date, and admitted by the
Commission after prudence check.
3.4
“applicant” means a generating company or a transmission licensee or a distribution licensee or SLDC
who has made an application for determination of tariff / charges or an application for annual
performance review / true-up in accordance with these Regulations and the Act and includes a
generating company or a transmission licensee or a distribution licensee or SLDC whose tariff / charges
the subject of review by the Commission;3.4 “ARR” means Aggregate Revenue Requirement
comprising of allowable Operating Expenses (OPEX), Capital Expenditure (CAPEX) and Return on
Equity (RoE) for generation, transmission & SLDC and Wheeling& Retail supply of electricity by a
distribution licensee;
3.5
“Allocation Statement” means annual financial statement in respect of each of the separate businesses
of the Licensees, showing the amount of revenue, costs / expenses, assets, liability, reserves and basis
of provisions, if any which has been either:
(i)
charged from or to each such separate business together with a description of the basis of that
charge; or
(ii)
determined by apportionment or allocation between the Licensed/Regulated Business and every
other separate business of the Licensee/Generation Company, together with a description of the
basis of the apportionment or allocation:
Provided that ‘Allocation’ Statement’ shall not be construed as a substitute for
maintaining separate accounting statement for the licensed business and other businesses of the
Licensees.
Provided that the licensed business of a distribution and retail supply licensee(s) shall be
segregated as Wheeling Business (wires) and Retail Supply Business.
Provided that the licensed business of a transmission licensee(s) shall be segregated as
‘transmission businesses and ‘State Load Despatch businesses.
Provided that the generation company shall segregate its accounting data Unit Wise and
that such allocation statement in respect of a generating station shall be maintained in a manner
so as to enable tariff determination, stage-wise, Unit-wise and/or for the whole generating
station.
HARYANA GOVT. GAZ., NOV. 12, 2019 (KRTK. 21, 1941 SAKA)
[ PART III
404
3.6
“auditor” means an auditor appointed in accordance with the provisions of section 139 of Companies
Act, 2013 or any other law for the time being in the force;
3.7
“auxiliary energy consumption” or 'AUX' in relation to a period means the quantum of energy
consumed by auxiliary equipment of the generating unit / plant such as the equipment being used for
the purpose of operating plant and machinery including switchyard of the generating station and
transformer losses within the generating unit / plant, expressed as a percentage of the sum of gross
energy generated at the generator terminals of the generating unit / all the units of the generating plant;
Provided that AUX shall not include energy consumed for supply of power to housing colony
and other facilities at the generating station and the power consumed for construction works at the
generating station;
3.8
“availability”
(i)
in relation to transmission system for a given period means the time in hours during that period
the transmission system is capable to transmit electricity at its rated voltage and shall be
expressed in percentage of total hours in the given period and calculated as per the formula
specified in Appendix - I to these Regulations;
(ii)
in relation to a generating station, for a given period, it shall mean the average of the daily
declared capacities as certified by the State Load Despatch Centre (SLDC) for all the days
during the period expressed as a percentage of the installed capacity minus normative AUXc as
provided in these Regulations. The formula specified for the purpose shall be as under: -
Availability (%) =
)
100
(
10000
n
i
AUX
IC
N
DC
Where:
IC
=
Installed Capacity of the generating plant in MW,
DCi =
Average Declared ex-bus Capacity for all days during the period in MW,
N
=
Number of days in the given period,
AUXn =
Normative Auxiliary Energy Consumption as a percentage of gross generation,
∑
=
Summation from i = 1 to N;
3.9
“bank rate” shall mean the State Bank of India Marginal Cost of Funds based Lending Rate (MCLR)
of one-year tenor, prevalent at the beginning of the relevant financial year.
3.10
“base year” means the financial year immediately preceding the first year of the Control Period and
used for the purposes of these Regulations;
3.11
“beneficiary” in relation to a
(i)
“generating plant” means the person buying power generated at such a generating plant whose
tariff is determined under these Regulations.
(ii)
“transmission system” means the person who has availed of the transmission system on
payment of transmission charges determined under these Regulations. This includes a
distribution licensee, a transmission licensee, a person who has setup a captive power plant or a
generating company including merchant power plant or a consumer availing long-term or
medium-term open access utilizing such transmission system. Short-term open access consumers
will not be treated as beneficiaries;
(iii)
“SLDC” means the person who uses the services of SLDC and shall include distribution
licensee, transmission licensee, a person who has set up captive power plant or a generating
company including merchant power plant or a consumer availing long-term or medium-term
open access.
3.12
“block” in relation to a combined cycle thermal generating plant includes combustion turbine
generator(s), associated waste heat recovery boiler(s), connected steam turbine generator and
auxiliaries;
3.13
“CERC” means the Central Electricity Regulatory Commission;
3.14
“collection efficiency” means the ratio of total revenue realised to the total revenue billed during the
same financial year. The revenue realisation from arrears pertaining to the same financial year shall be
included but revenue realisation from late payment surcharge and arrears pertaining to the previous
years shall not be included for computation of collection efficiency;
PART III]
HARYANA GOVT. GAZ., NOV. 12, 2019 (KRTK. 21, 1941 SAKA)
405
3.15
“Commission” means the Haryana Electricity Regulatory Commission;
3.16
“conduct of business Regulation” means Haryana Electricity Regulatory Commission (Conduct of
Business) Regulations, 2004 as amended / re-enacted from time to time;
3.17
“control Period” means a multi-year tariff period fixed by the Commission from time to time. The
control period, under these Regulations, shall be of five years i.e. from 1st April 2020 to 31st March
2025.
3.18
“core business” for the purpose of these Regulations, means the regulated activities of the generating
company or the transmission licensee or the distribution licensee, as the case may be, and does not
include any other business;
3.19
“cut-off date” means 31st March of the year closing after two years of the year of commercial operation
of the project, and in case the project is declared under commercial operation in the last quarter of a
year, the cut-off date shall be 31st March of the year closing after three years of the year of commercial
operation;
3.20
“Change in Law” shall mean occurrence of the following events: -
(a)
enactment, bringing into effect or promulgation of any new Indian law; or
(b)
adoption, amendment, modification, repeal or re-enactment of any existing Indian law; or
(c)
change in interpretation or application of any Indian law by a competent court, Tribunal or
Indian Governmental Instrumentality which is the final authority under law for such
interpretation or application; or
(d)
change by any competent statutory authority in any condition or covenant of any consent or
clearances or approval or licence available or obtained for the project; or
(e)
coming into force or change in any bilateral or multilateral agreement or treaty between the
Government of India and any other Sovereign Government having implication for the
generating station or the transmission system regulated under these regulations.
“Provided that financial implication of change in law in relation to a PPA or TSA
shall be as may provide in the PPA or TSA”.
3.21
“date of commercial operation (COD)” means
(a) In relation to a generating unit, the ‘date of Commercial Operation declared by the generating
company after demonstrating the maximum continuous rating (MCR) or Installed Capacity (IC)
through a successful trial run after seven days’ notice to the beneficiaries and scheduling shall
commence from 00.00 Hrs of the day following the day of successful completion of trial run.
Additionally, the Generator shall certify that the said generation unit fully comply with the
applicable provisions and technical standards of the Central Electricity Authority (Technical
Standards for Construction of Electrical Plants an Electric Lines) Regulations, 2010 and Haryana
Electricity Regulatory Commission (Grid Code) Regulations, as amended and in vogue and / or re-
enacted.
(a)
In relation to the generating plant, the date of commercial operation of the last unit or block of
the generating plant;
(b)
In relation to Hydro Power Plants including PSP, CoD shall be the date declared by the
Generating Company after demonstrating peaking capacity corresponding to the installed
capacity of the generating station through successful trail run after seven days’ notice to the
beneficiaries and scheduling shall commence from 00.00 Hrs of the day following the day of
successful completion of trial run. Additionally, the Generator shall certify that the said
generation unit fully comply with the applicable provisions and technical standards of the
Central Electricity Authority (Technical Standards for Construction of Electrical Plants an
Electric Lines) Regulations, 2010 and Haryana Electricity Regulatory Commission (Grid Code)
Regulations, as amended and / or re-enacted.
Provided further, that in case a hydro generating station, with pondage, is unable to
demonstrate peaking capacity corresponding to the installed capacity due to insufficient
reservoir / pond level, the CoD shall be consider as the date of commercial operation of the last
unit of the generating unit. However, it shall be mandatory for such hydro generator to
demonstrate peaking capacity corresponding to the installed capacity as and when such reservoir
/ pond level is achieved. The same in the case of run-of-river shall be as soon as sufficient water
flow is available subsequent to the lean inflow season.
HARYANA GOVT. GAZ., NOV. 12, 2019 (KRTK. 21, 1941 SAKA)
[ PART III
406
(c)
in relation of transmission system, the date from 00.00 Hrs of charging the transmission system
or part thereof to its rated voltage level or seven days after the date on which it is declared ready
for charging by the transmission licensee, but is not able to charge for reasons not attributable to
the transmission licensee, its suppliers or contractors.
Provided in the case of dedicated transmission line / sub-station, the Generating
Company and the Transmission Licensee shall ensure that the transmission system is
commissioned well within the time frame agreed upon by them. However, in case the delay in
commissioning is on account of the generating station concerned, the transmission licensee shall
approach the Commission with an appropriate petition for approval of the CoD of such
transmission system or transmission element as such. However, any charges for the transmission
line/ sub-station not put in use due to reasons attributable to generating station shall be borne by
the generation company until such transmission line/ sub-station is put to use for evacuation of
power of the said generating station.
3.22
“declared capacity” or ‘DC’ means the capability of generating plant to deliver ex-bus electricity in
MW declared by such generating plant in relation to any time-block of the day or whole of the day,
duly considering the availability of fuel or water;
3.23
“De-capitalization” means reduction in Gross Fixed Assets (GFA) and reflected in the Fixed Assets
Register subsequent to removal of the assets as admitted by the Commission;
3.24
“Design Energy” in relation to hydro power plant means the quantum of energy that could be
generated in a 90 percent dependable year with 95 percent installed capacity of the generating station;
3.25
“Distribution Business” means the business of operating and maintaining a distribution system for
supplying electricity in the area of supply of the distribution licensee;
3.26
“Distribution wires Business” means the business of operating and maintaining the system for
wheeling of electricity in the area of supply of the distribution licensee;
3.27
“existing generating plant” means generating plants declared under commercial operation on or a date
prior to 31st March 2020;
3.28
“existing transmission system” means the transmission system declared under commercial operation on
or a date prior to 31st March 2020;
3.29
“Force Majeure’ for the purpose of these regulations shall mean the events or circumstances or
combination of events and circumstances including those stated below which partly or fully prevents
the generating company or transmission licensee or distribution licensee to complete the project within
the specified timeline in the investment approval, and only if such events or circumstances are not
within the control of the generating company or transmission licensee or distribution licensee and could
not have been avoided, had they taken reasonable care or complied with the prudent practices :
(a)
Act of God including lightening, drought, fire and explosion, earthquake, volcanic eruption,
landslide, flood, cyclone, typhoon, tornado, geological surprises, or exceptionally adverse
weather conditions which exceeds the statistical measures for the last hundred years; or
(b)
Any act of war, invasion, armed conflict or act of foreign enemy, blockade, embargo, revolts,
riot, insurgency, terrorist or military action; or
(c)
Industrial Strikes and labor disturbances having nationwide impact in India; or
(d)
Delay in obtaining statutory approval for the project except where the delay is attributable to the
project developer(s);
3.30
“gross calorific value” or ‘GCV’ in relation to a thermal power generating plant means the heat
produced in kCal by complete combustion of one kilogram of solid fuel or one litre of liquid fuel or one
standard cubic meter of gaseous fuel, as the case may be;
3.31
“station heat rate” or ‘SHR’ means the heat energy input in kCal required to generate one kWh of
electrical energy at generator terminals;
3.32
“infirm power” means electricity injected into the grid prior to the Scheduled COD or the date of
commercial operation of a unit or block of a generating plant whichever is earlier;
3.33
“installed capacity” or 'IC’ means the summation of the name plate capacities of all the units of the
generating plant or the capacity of the generating plant (reckoned at the generator terminals) approved
by the Commission from time to time;
3.34
“licensee” means any person or persons granted license under Section 14 or exempted under Section 13
of the Act including deemed licensee
PART III]
HARYANA GOVT. GAZ., NOV. 12, 2019 (KRTK. 21, 1941 SAKA)
407
3.35
“licensed business” means the functions and activities, which the licensee(s) is required to undertake
in terms of the licence granted by the Commission or as a deemed Licensee(s) under the Act;
3.36
“long-term transmission consumer” means a distribution licensee or a person having a long-term lien
for a period as defined in the open access Regulations notified by the Commission from time to time,
over an intra-State transmission system by paying all applicable charges for which appropriate
agreement has been entered into with the transmission licensee;
3.37
(a) “market operation function” means functions of scheduling, dispatch, metering data collection,
energy accounting & settlement, transmission loss calculation & apportionment, operation of pool
account & congestion charge account, administering ancillary services & information dissemination
and any other function assigned to the SLDC by the Electricity Act, 2003 or by HERC Regulations and
Orders;
(b) “market operation charges” means the charges, as approved by the Commission, to be recovered
by the SLDC from the users for performing market operation functions.
3.38
“maximum continuous rating” or ‘MCR’ in relation to a unit of the thermal power generating plant
means the maximum continuous output at the generator terminals, guaranteed by the manufacturer at
rated parameters, and in relation to a block of a combined cycle gas based thermal power generating
plant means the maximum continuous output at the generator terminals, guaranteed by the
manufacturer with water or steam injection, if applicable, and corrected to 50 Hz grid frequency and
specified site conditions;
3.39
“medium term transmission consumer” means a person having a medium-term lien for a period as
defined in the open access Regulations notified by the Commission from time to time over an intra-
State transmission system by paying all applicable charges;
3.40
(a) “new generating plants” means generating plants declared under commercial operation on a date
after 31st March 2020;
(b) “new transmission system” means the transmission system declared under commercial operation
on a date after 31st March 2020;
3.41
“operation and maintenance expenses” or “O&M expenses” mean the expenditure incurred on
operation and maintenance of the generating plant or transmission system or distribution system, as the
case may be, including part thereof, and includes the following expenditure:
a.
Employee cost (EC)
b.
Repair and Maintenance (R & M) expenses;
c.
Administration and General (A &G) expenses;
3.42
“plant load factor” or 'PLF’ for a given period, means the total sent out energy corresponding to
actual generation during the period, expressed as a percentage of sent out energy corresponding to
installed capacity in that period and shall be computed in accordance with the following formula:
PLF (%) =
)
100
(
10000
n
i
AUX
IC
N
G
Where:
IC
=
Installed Capacity of the generating Plant/Unit in MW,
Gi
=
Actual ex-bus Generation in MW for the ith time block of the period,
N
=
Number of Time Blocks during the period,
AUXn
=
Normative Auxiliary Energy Consumption as a percentage of gross
generation,
∑
=
Summation from i = 1 to N;
3.43
“project”
(a) In case of generation business comprising thermal generating station, all components of the
thermal generating station and shall include coal handling plant, pollution control system, effluent
treatment plan, as may be required;
HARYANA GOVT. GAZ., NOV. 12, 2019 (KRTK. 21, 1941 SAKA)
[ PART III
408
(b) In case of generation business comprising hydro generating station, all components of the
hydro generating station and shall include dam, intake water conductor system, power generating
station, as apportioned to power generation;
(c) In relation to the transmission business means a transmission system comprising specified
transmission lines, sub-stations and associated equipment including communication system;
(d) In relation to State Load Despatch Centre means any project associated with integrated
operation of power system in the State; and
(e) In relation to distribution business means a distribution system comprising specified
distribution lines, sub-stations and associated equipment;
3.44
“Prudence Check” means scrutiny of reasonableness of expenditure incurred or proposed to be
incurred, financing plan, use of efficient technology, cost and time over-run and such other factors as
may be considered appropriate by the Commission for determination of tariff;
3.45
“rated voltage” means the manufacturer’s design voltage at which the transmission/distribution system
is designed to operate or such lower voltage at which the line is charged, for the time being, in
consultation with supplier and receiver of electricity
3.46
“retail supply business” means the business of sale of electricity by a Distribution Licensee(s) to the
various categories of consumers within the area of supply in accordance with the terms of the License
for distribution and retail supply of electricity;
3.47
“revenue” means the amount billed or assessed to be billed at the applicable tariff including any fuel
price adjustments in the case of a Generating Company and in the case of distribution licensees shall be
inclusive of MMC, FSA or any other charges i.e. power factor surcharge, load / demand surcharge etc.
for sale of power.
3.48
‘Scheduled Energy’ means the quantum of energy scheduled by the State Load Dispatch Centre to be
injected into the grid by a generating station for a given time period;
3.49
“Scheduled generation” for any given time or time block means the quantum of ex-bus energy
scheduled by the State Load Dispatch Centre to be injected into the grid by a generating plant.
3.50
“short-term transmission consumer” in the context of usage of Transmission System means a person
having short-term lien for a period as defined in the open access Regulations notified by the
Commission from time to time over an intra-State Transmission System by paying all applicable
charges;
3.51
“State” means State of Haryana;
3.52
“State Load Dispatch Centre” or ‘SLDC’ means the centre established by the State Government
under section 31 of the Act for purposes of exercising the powers and discharging the functions under
Section 32 of the Act;
3.53
(a) “System Operation Functions” includes monitoring of grid operations, supervision and control
over the intra – state Transmission System, real – time operations for grid control, system restoration
following grid disturbances, compiling and furnishing data pertaining to system operation, congestion
management/co-ordination with RLDC, black start co-ordination and any other functions assigned to
the SLDC by the Electricity Act, 2003 or by HERC Regulations and Orders.
(b) “System Operation Charges” means the charges, as approved by the Commission, to be recovered
by the SLDC from the users for performing system operation functions.
3.54
“tariff ” means the schedule of charges for generation, transmission and distribution & retail supply of
electricity with terms and conditions applicable thereto;
3.55
“transmission service agreement” or ‘TSA’ means an agreement, contract, memorandum of
understanding, or any such covenant, entered into between the transmission licensee and the long-term
transmission consumer(s), as approved by the commission, for the use of transmission system
3.56
“transmission system” means a transmission line or a group of transmission lines inter-connected
together with or without associated sub-stations including equipment associated with transmission lines
and sub-stations;
PART III]
HARYANA GOVT. GAZ., NOV. 12, 2019 (KRTK. 21, 1941 SAKA)
409
3.57
Trial Run or Trial Operation: Trial Run or Trial Operation in relation to a thermal Generating Station
or a unit thereof shall mean successful running of the generating station or unit thereof on designated
fuel at Maximum Continuous Rating or Installed Capacity for a continuous period of 72 hours and in
case of a hydro Generating Station or a unit thereof for a continuous period of 12 hours:
Provided that:
(i)
The short interruptions, for a cumulative duration of 4 hours, shall be permissible, with
corresponding increase in the duration of the test. Cumulative Interruptions of more than
4 hours shall call for repeat of trial operation or trial run.
(ii)
The partial loading may be allowed with the condition that average load during the
duration of the trial run shall not be less than Maximum Continuous Rating, or the
Installed Capacity excluding period of interruption and partial loading but including the
corresponding extended period.
(iii)
Units of thermal and hydro Generating Stations shall also demonstrate capability to raise
load upto 105% or 110% of this Maximum Continues Rating or Installed Capacity, as the
case may be.
3.58
“unit” unit’ in relation to a thermal power generating plant means steam generator, turbine-generator
and auxiliaries, or in relation to a combined cycle gas based thermal power generating plant, means
turbine-generator, waste heat recovery plant and auxiliaries‘and in relation to a hydro generating station
means turbine-generator and its auxiliaries’;
3.59
“unscheduled interchanges” or ‘UI’ means the unscheduled interchange of energy as mentioned in the
Indian Electricity Grid Code or as defined in the Intra State ABT Regulations of HERC as may be
notified from time to time;
3.60
“wheeling” means the operation whereby the distribution system and associated facilities of a
transmission licensee or distribution licensee, as the case may be, are used by another person for the
conveyance of electricity on payment of charges to be determined under section 62 of the Act;
3.61
“wheeling business” means the business of operating and maintaining a distribution system for
conveyance of electricity in the area of supply of the distribution licensee;
3.62
“Year” means the financial year i.e. a period commencing on 1st April of a calendar year and ending on
31st March of the subsequent calendar year;
(a)
“Current Year” means a year in which the petition for aggregate revenue requirement or
determination of tariff is to be filed;
(b)
“Ensuing Year” means the year immediately following the current year; and
(c)
“Previous Year” means the year immediately preceding the current year
3.63
“Technical Minimum Schedule” in respect of State Generating Stations shall have the same meaning
as provided in Regulation 34 of these Regulations.
Words appearing in these Regulations and not defined shall bear the same meaning as in the Act. All
other expressions used herein but not specifically defined herein but defined in the Act shall have the
meaning assigned to them in the Act. The expressions used herein but not specifically defined in the
Regulations or in the Act but defined under Haryana Electricity Reform Act, 1997 (Act 10 of 1998)
shall have the meaning assigned to them under the said Act, provided that such definitions in the
Haryana Electricity Reform Act, 1997 are not inconsistent with the provisions of the Electricity Act,
2003.
HARYANA GOVT. GAZ., NOV. 12, 2019 (KRTK. 21, 1941 SAKA)
[ PART III
410
PART II - MULTI YEAR TARIFF FINANCIAL PRINCIPLES
4.
GENERAL
4.1
The Commission, in specifying these Regulations, is guided by the provisions of Sections 61 and 62 of
the Electricity Act, 2003, the National Electricity Policy and the National Tariff Policy notified by the
Central Government under Section 3 of the Act as amended from time to time as well as the relevant
Regulations notified by the Central Commission.
4.2
The Commission shall adopt Multi Year Tariff (MYT) framework for determination of ARR/tariff for
each year of the Control Period from the FY 2020-21 i.e. 1.04.2020.
4.3
Basis of implementation of Multi Year Tariff framework: -
The implementation of MYT framework shall be based on the following: -
(a)
The capital investment plan and the business plan for a period not less than the control period to
be submitted by the utilities for their respective businesses along with the MYT Petition;
Provided that to begin with, the generating companies and the licensees may file their
business plan by the end of January 2020 and the first-year investment plan with the respective
MYT Petition for the second control period under these Regulations.
(b)
The forecast for each year of the control period of the various financial and operational
parameters of ARR, based on reasonable assumptions, to be filed by the utilities for their
respective businesses;
(c)
The trajectory for specific variables as may be stipulated by the Commission, where the
performance of the utilities for their respective businesses is sought to be improved under
incentive and penalty framework;
(d)
The mid-year performance review vis-a-vis the approved forecast and variations in performance
of controllable and uncontrollable items;
Provided that the Generating Company and the Licensees shall submit their Accounting
Statements / Segmented Accounts / Allocation Statement to support their claims / assessment
including reasons of variations in various expenses, at the time of performance review / Truing-
up.
(e)
The mechanism for sharing approved gains or losses on account of controllable items;
(f)
The mechanism for pass through of approved gains or losses on account of uncontrollable items.
Provided that the Commission shall apply prudence check with regard to the following: -
(i)
Revenue from Sale of Power- whether consumer category wise sales projections are
backed up by consumer category wise time series data on connected load / contract
demand, sales trend, number of consumers and any abnormal increase / decrease has been
adequately explained.
(ii)
Billing Efficiency - measured as a percentage of Units billed by the distribution licensee
to the total units injected into the distribution system.
Provided that in the case of a transmission licensee, the same shall be expressed as a
percentage of units injected into the transmission system’
(iii)
Revenue Collection Efficiency- shall be measured as a percentage of revenue realised by
a generating company / Licensee against the total amount billed excluding arrears.
(iv)
Reduction in outstanding receivables from consumers including un-paid RE Subsidy, if
any and beneficiaries in the case of transmission licensees and Generating Company.
(v)
Percentage of consumers billed on the basis of meter reading to the number of consumers
billed on average / assessed basis.
(vi)
Revenue Expenditure including interest payments on term loan / working capital loans
vis-a-vis revenue earned. Any revenue expenditure in excess of revenue earned shall be
supported by a detailed justification including source of funding at the time of Truing-up;
(vii) Merit Order scheduling of power in line with requirement and additional revenue earned
over and above the average power purchase cost on trading of surplus power;
(viii) Assessment of financial and physical progress of Capital Expenditure under each head
vis-a-vis the schedule submitted and approved by the Commission. In case of any
deviation in Capital Expenditure including Capitalisation, the generating company /
Licensee shall submit a detailed justification at the time of truing-up. The loan drawl
should be matched with physical progress of Capital Works undertaken under each head.
PART III]
HARYANA GOVT. GAZ., NOV. 12, 2019 (KRTK. 21, 1941 SAKA)
411
4.4
Tariff during the control period: The Commission shall determine the ARR for each year of the control
period and tariff for the first year of the control period separately for Generation Company (ies),
transmission licensee(s) / SLDC and distribution licensee(s).
4.5
The tariff applicable to each business in each of the remaining years of the control period shall be
notified by the Commission through a separate order after taking into consideration the following: -
(a)
Mid-year performance review;
(b)
Specified performance targets;
(c)
True-up of uncontrollable items as defined in Regulation 8.3 and of controllable items as
provided in regulation.
4.6
There will be no true-up of the controllable items except on account of Force Majeure events or on
account of variations attributable to uncontrollable items. The variations in the controllable items, as
defined in Regulation 8.3, over and above the norms specified will be governed by incentive and
penalty framework specified in these Regulations.
4.7
The tariff determined by the Commission and the directions given in the MYT order shall be quid pro
quo and mutually inclusive. The tariff determined shall, within the time period specified in the order, be
subject to the compliance of the directions by the generating company and the licensees to the
satisfaction of the Commission. Non-compliance of the directions shall lead to such amendment,
revocation, variations and alterations in the tariff, as may be ordered by the Commission. Further non-
compliance of directions given in the tariff order may also lead to invocation of the provisions of
section 142 and 146 of the Electricity Act, 2003.
Provided the Generation Company and / or the Licensee may seek extension in time for
compliance of the directives with appropriate justification to the satisfaction of the Commission.
4.8
The tariff determined by the Commission shall continue to be applicable till it is modified / amended or
revised by the Commission.
4.9
The norms specified under these Regulations are the ceiling norms and this shall not preclude the
generating company and/or licensee or any other person, as the case may be, from agreeing to improved
norms of operation. In case the improved norms are agreed to, such norms shall be applicable for
determination of tariff.
5.
PLANT WISE COMPUTATION OF TARIFF FOR GENERATING COMPANY
5.1
The tariff for the generating company shall be determined plant-wise. Following shall be the
categorization for the existing thermal plants of State Generator i.e. HPGCL: -
S.No.
Plant
Capacity (MW)
1
Panipat TPS Unit 5 & 6
Unit-5:
Unit-6:
210
210
2
Panipat TPS Unit 7 and 8
Unit-7:
Unit-8:
250
250
3
DCR TPS Yamunanagar
Unit-1:
Unit-2:
300
300
4
Rajiv Gandhi TPS Khedar (Hisar)
Unit-1:
Unit-2:
600
600
5.2
The generating company shall prepare its annual accounts in a manner such that all individual plants /
units are treated as separate business entity including any new plant that may be commissioned during
the control period.
5.3
The operational norms for each generating plant shall be specified unit-wise. Therefore, the statement
of account should also include the unit-wise performance parameters for each plant.
5.4
The generating company shall file the tariff petition as per the above categorization. All plants indicated
above and the plants which may be commissioned during the control period shall have separate
interface metering with the transmission licensee(s) as per CEA (Installation and Operation of Meters)
Regulations, 2006 as amended from time to time and, as and when intra state ABT is implemented,
HARYANA GOVT. GAZ., NOV. 12, 2019 (KRTK. 21, 1941 SAKA)
[ PART III
412
different power plant, as categorised above, shall be scheduled separately as per the intra State ABT
Regulations as may be notified by the Commission from time to time.
Provided that a Generation entity may file an application for determination of provisional tariff
for a new generating station or Unit(s) six months prior to the scheduled date of commissioning.
5.5
For the plants, if any, not covered under ABT the Commission may determine, single part tariff based
on a normative PLF.
Provided the Commission may determine tariff for hydro power projects up to 25 MW
separately as per the norms specified in the HERC RE Tariff Regulations in vogue.
5.6
‘target / normative availability’ and ‘target / normative PLF’ shall be construed as normative
availability and normative PLF till such the time power plants are brought under intra-State ABT
framework.
6.
ARR / Tariff OF TRANSMISSION BUSINESS AND SLDC
6.1
The transmission licensee i.e. Haryana Vidyut Prasaran Nigam (HVPN) has been notified as the State
Transmission Utility by the Haryana Government as per Section 39(1) of the Act and has also been
entrusted with the operation of SLDC. Accordingly, HVPN shall submit separate ARR for its
transmission business and SLDC business, as long as it remains under its control, as per provisions of
these Regulations.
6.2
The HVPN shall maintain separate accounts for SLDC and transmission business. Till accounts are
segregated, STU shall prepare an Allocation Statement to apportion costs and revenues to respective
businesses. The Allocation Statement shall be considered by the Commission only if it is certified by
the Statutory Auditor/Cost Auditor and approved by the Board of Directors of the STU, and it shall be
accompanied with an explanation of the methodology which shall be consistent over the Control
Period.
6.3
After a Government company or an authority or a corporation is established or constituted for operation
of SLDC by or under any State Act, as may be notified by the State Government as per provisions of
Section 31 of the Act, the ARR for SLDC business shall be submitted by such Government company,
authority or corporation, as the case may be, as per provisions of these Regulations.’
6.4
The Commission may require the STU or the Government company/Authority/Corporation established
for operation of SLDC or the SLDC itself to submit such details/information as may be required for
determination of SLDC charges. Further, the Commission may give directions to SLDC in relation to
the role and functioning of SLDC.
6.5
The transmission tariff determined by the Commission shall comprise all or any of the following: -
(i)
Transmission System Access Charges (TSAC);
(ii)
Annual Transmission Charges (ATC);
(iii)
Per Unit charges for energy transmitted (Rs/kWh or kVAh);
(iv)
Reactive Energy Charges (Rs / kVARh);
ATC, for each financial year of the control period shall be designed to recover the ARR of the
Transmission Licensee for the respective financial year as approved by the Commission.
The ARR shall comprise of the following: -
(ii)
Operation & Maintenance Expenses (O&M)
Administrative & General Expenses (A&G);
Employees Expenses (working & retired);
Repair & Maintenance (R&M);
(iii)
Depreciation;
(iv)
Interest Expenses
on term loan (IoTL);
on working capital loan (IoWC);
(v)
Return on Equity (RoE)
(vi)
Income Tax / MAT
(vii)
Foreign Exchange Rate Variation (FERV) applicable on foreign currency loans.
PART III]
HARYANA GOVT. GAZ., NOV. 12, 2019 (KRTK. 21, 1941 SAKA)
413
Provided that Non-Tariff Income, Income from Open Access Consumers and income from
intrastate transmission lines designated as interstate transmission lines wherein Yearly Transmission
Charges are recovered through Point of Connection (PoC) charges as per CERC Regulations / Order(s),
shall be deducted while determining ATC recoverable by the transmission licensee(s) from its long-
term beneficiaries.
Provided that Non-Tariff Income shall include, but not limited, to Income from rent of
land/building, sale of scrap, investments/advances, rentals, supervision charges for capital works, sale
of tender/documents/advertisements etc.
6.6
The Commission may implement a transmission pricing mechanism for transmission licensee in such a
way so as to align intra-State transmission pricing mechanism with the inter-State transmission pricing
mechanism as adopted by the Central Electricity Regulatory Commission in line with the National
Tariff Policy of the Government of India.
Provided the existing transmission licensee / STU are able to collect and collate sufficient data /
underlying assumptions including voltage wise transmission loss allocation factor w.r.t. distance
sensitive cost of transmission after undertaking a detailed study relating the hybrid method (PoC
methodology of CERC bringing together the marginal and average participation approach) and load
flow study including its likely impact on the beneficiaries of transmission services along with the
timelines for implementing the same.
6.7
The aggregate revenue requirement, net of deductions and other income, for transmission business as
approved by the Commission for the control period shall be the total cost of the transmission system
(ATC). The ATC shall be recovered from all the users of the Transmission System for the respective
year(s) of the control period as per the formula specified herein.
ATC = ∑n
i=1 ARRi – NTIi – OIi )
The notations are as explained below:-
ATC = Total Transmission System Cost of the relevant year of the Control Period.
n = Number of Transmission Licensee (in case more than one except those selected through
competitive bidding mode u/s 63 of the Electricity Act, 2003).
NTI = Non-Tariff Income as approved by the Commission for the ith year of the Control Period.
OI = Other Income i.e. income from any business of the transmission licensee other than the regulated
business income / revenue from which is required to be shared for the ith year of the Control Period.
Provided that the ATC, as determined by applying the ibid formula shall be either:-
i) Shared by the long-term beneficiaries of the Transmission System in proportion to the respective
transmission system of each user of the transmission system allotted in the intra-state transmission
system.
Or
Depending on the availability and reliability of the recorded data_.
ii) Average of the respective projected simultaneous maximum peak (co-incidental system peak) and
non-coincidental peak for each long-term transmission system users.
Provided that the above shall be subject to truing – up on availability of actual data of co-
incidental and non-coincidental system peak as per the dispensation of truing-up provided in these
Regulations.
Provided also that the base transmission tariff for short term users including Open Access
Consumers shall be determined in accordance with the following formula:-
TT = ATC / ∑n
i=1 (Energy Transmitted by Transmission Licensee)
Where:
TT = Transmission Tariff (Rs/kWh)
ATC = Total Transmission System Cost of the relevant year of the Control Period.
Provided that the energy (kWh) transmitted by the transmission licensee(s) shall be as projected
by the transmission licensees in their MYT petition and approved by the Commission after following
the due process. Any variation in projected / approved and actual shall be trued up at the time of mid-
term on availability of audited data / information.
HARYANA GOVT. GAZ., NOV. 12, 2019 (KRTK. 21, 1941 SAKA)
[ PART III
414
6.8
Provisional Transmission Tariff
6.9
The Commission, on a petition filed by the existing Transmission Licensee or a new Transmission
Licensee in Haryana, shall determine and approve transmission tariff under these Regulations on a
provisional basis.
Provided a petition for determination of provisional transmission tariff is filed before the
Commission at least six months prior to the anticipated / scheduled date of commercial operation of the
transmission system.
6.10
The petition for determination of provisional transmission tariff shall inter alia include the following: -
(i)
Capital Expenditure incurred and projected to be incurred up to the date of scheduled
commercial operation including additional capital expenditure incurred duly certified by the
statutory auditor.
(ii)
Details of all the underlying assumptions
(iii)
Based on the above, provisional transmission tariff shall be determined and allowed from the
scheduled date of commercial operation.
Provided in the case the CoD is delayed beyond six months from the date of
Commission’s Order determining / approving provisional transmission tariff, the said Order
shall cease to be applicable and the Petitioner shall be required to file a tariff petition afresh after
the date of CoD.
(iv)
The transmission licensee shall file a petition for determination of final tariff transmission tariff
within six months from the date of CoD based on the audited capital expenditure and
capitalisation as o the date of CoD of the transmission project.
(v)
The Commission shall determine final tariff based on prudence check of the audited capital
expenditure and capitalisation thereto as on date of CoD including but not limited to
benchmarking capital expenditure and capitalisation against similar transmission projects
commissioned elsewhere in the country.
Provided where the final transmission tariff determined / approved by the Commission is
+/- 5% of the provisional tariff, the differential amount shall be restored / recovered from the
beneficiaries along with interest rate as may be considered reasonable by the Commission
subject to the ceiling of the interest rate allowed to the transmission licensee on its working
capital loans.
7.
WHEELING (PURE WIRES) AND RETAIL SUPPLY BUSINESS
7.1
The distribution licensee shall segregate the accounts of the licensed business into Wheeling Business
and Retail Supply Business and submit separate ARRs for the respective businesses. The ARR,
approved by the Commission, for Wheeling Business, shall be an input to determine wheeling charges
recoverable from Open Access consumers and the ARR for Retail Supply Business, as approved by the
Commission, shall be considered to determine Retail Supply tariff for sale of electricity to different
categories of consumers of the distribution licensee which will be inclusive of wheeling charges.
Provided that till such time the accounts are segregated, as per provisions of these Regulations,
the distribution licensee shall prepare an allocation statement to apportion costs and revenues to
respective business. The allocation statement shall be approved by the Board of Directors of the
distribution licensee and accompanied with an explanation of the methodology which should be
consistent over the control period under these Regulations.
8.
MYT APPROACH
8.1
Base Line values- The Commission shall determine baseline values for various financial and
operational parameters of ARR for the control period taking into consideration such parameters
approved by the Commission in the past, actual average figures of last three years, audited accounts,
estimate of the figures for the relevant year, Industry benchmarks/norms and other factors as may be
considered appropriate by the Commission;
8.2
Control Period – The second control period under Multi-Year Tariff framework shall be a period of
five (5) years commencing from 1st April 2020.
8.3
The Aggregate Revenue Requirement (ARR) of the Distribution Business (wires) to be recovered
through wheeling charges of the distribution licensee(s) shall comprise the following: -
(i)
Interest on Term Loan
PART III]
HARYANA GOVT. GAZ., NOV. 12, 2019 (KRTK. 21, 1941 SAKA)
415
(ii)
Interest on normative Working Capital
(iii)
Interest on deposits from distribution system users
(iv)
Depreciation
(v)
Operation & Maintenance Expenses
(vi)
Return on average (opening + closing) Equity for the relevant year
(vii) Provision for bad and doubtful debts as may be admitted by the Commissions subject to the
ceiling of 0.5% of the account receivable as per the audited accounts of the relevant year.
Provided that the wheeling charges shall be net of i) Non-Tariff Income, ii) Income from Other
Business (ARR – (Non-Tariff Income + Income from Other Business).Non-Tariff Income shall include
rent from land / building, sale of scrap, investment income, interest earned on advances to suppliers /
contractors, rental income from staff quarter / guest houses, income from schedule of charges, income
from supervision charges for capital works, income from sale of tender documents, income from
advertisements etc.
Provided also, prior period income / expenses shall be allowed by the Commission at the time of
truing-up based on the audited accounts on a case to case basis subject to prudence check. However, all
penalties payable by the distribution licensee arising from Commission’s order, courts / tribunal, CGRF
/ Ombudsman shall not be allowed to be recovered through ARR.
8.3.1 The method of recovery of the Distribution charges (wires business) shall either be on the basis
of energy wheeled basis (Rs. kWh / kVAh) or on the basis of contracted capacity
(Rs/kW/kVA/month) as considered appropriate by the Commission.
8.3.2 Distribution Loss (%) / Aggregate Technical & Commercial loss (%) shall be as determined by
the Commission in the Order in the MYT petition filed by the power utilities.
Provided that for wheeling transactions, the voltage wise wheeling loss shall be
determined by the Commission in the MYT petition filed by the power utilities.
Provided for the above, the voltage wise technical losses shall be projected by the power
utilities based on system configuration and capital investment plan.
8.3.3 O&M Expenses (Wires Business) shall comprise of Employees Cost, Repair & Maintenance
Expenses (R&M), Administrative & General Expenses (A&G).
Provided that between Distribution (Wires) and Retail Supply Business, the individual
components of O&M Expenses shall be allocated, based on the segregated accounts/ allocation
statement submitted by the Licensee
8.3.4 The Aggregate Revenue Requirement of the Retail Supply Business to be recovered through
retail supply tariff of the distribution licensee(s) shall comprise the following: -
(i)
Power Purchase Cost
(ii)
Transmission Charges (Inter State & Intra State)
(iii)
Interest (Term Loan and normative Working Capital Loan, Consumer Security Deposit)
(iv) Depreciation
(v)
Operation & Maintenance Expenses
(vi) Provision for bad and doubtful debt subject to a ceiling of 0.5% of the account receivable
as per the latest available audited accounts.
(vi)
Return on Equity Capital
Provided that the ARR computed as per above shall be net of Non-Tariff Income, income
from Other Business, receipts from cross – subsidy surcharge and additional surcharge etc.
Provided further that the prior period expenses shall be considered at the time of truing –
up on a case to case basis subject to prudence check. However, all penalties payable by the
distribution licensee arising from Commission’s order, courts / tribunal, CGRF / Ombudsman
shall not be allowed to be recovered through ARR.
Provided that the Commission shall determine the distribution / AT&C loss trajectory in
the annual tariff Order after reviewing the actual losses including feeder wise loss levels in the
FY 2019-20 and beyond.
HARYANA GOVT. GAZ., NOV. 12, 2019 (KRTK. 21, 1941 SAKA)
[ PART III
416
8.3.5 Power Procurement: The distribution licensee shall procure power from the sources for which
Power Purchase Agreement has been approved by the Commission. The power procurement
plan shall be prepared incorporating aspects of peak support / peak shifting, ramping
requirements, ancillary services, grid security and deviation management. This shall be done by
way of including provision for Energy Storage Systems in the power procurement plan
Provided that for any procurement from medium to short term contracts that may be
required, the distribution licensee(s) shall obtain prior approval of the Commission with
supporting data / details along with proper justification.
Provided that the power procurement plan submitted for the control period shall comprise
of quantitative forecast of quantum and cost of the unrestricted base load and peak load demand
in its licensed area. An estimate of month wise availability of power to meet base load and peak
load demand both in terms of megawatt (MW) and Million Units (kWh). The procurement plan
shall inter-alia include action plan regarding energy conservation, energy efficiency and demand
side management.
Provided further that the power procurement plan shall also include procurement of
renewable energy or renewable energy certificate in case the available RE Sources are not
sufficient to meet with the RPO trajectory as specified by the Commission including backlog, if
any, allowed by the Commission during the previous year(s).
Provided that the Distribution licensee(s) shall share its power procurement plan with the
State Transmission Utility in order to maintain consistency in the intra-state transmission system
planning.
8.3.6 Power Purchase Agreement (PPA) – The Commission shall consider approval of PPA in the
light of the approved power procurement plan either u/s section 86(1)(b) or 63 of the Act.
Provided that all such PPAs shall be submitted in the Commission with complete
documentations and adherence to the relevant guidelines and policy. Further, no PPA /
Supplementary Agreement shall be executed without the prior approval of the Commission.
Provided that the Commission shall approve the PPA as such or with appropriate
modifications or reject the same after holding public / Stakeholders consultation on the same and
if the same is not in conformity to the level of transparency required including competitiveness
of the project or is found to be in violation of relevant statute / guidelines, the same shall not be
admitted and rejected outrightly.
8.3.7 The O&M norms for the retail supply business shall be same as in the case of Distribution
(Wires) business.
8.3.8 Controllable and Uncontrollable items of ARR
(a)
For the purpose of this Regulation, the items of ARR shall be identified as 'controllable'
or 'uncontrollable'. The variation on account of uncontrollable items shall be treated as a
pass-through subject to prudence check/validation and approval of the Commission;
Provided that the Commission may allow variations in controllable items on
account of Force Majeure events, as defined under these Regulations and also those
attributable to uncontrollable factors as pass-through in the ARR for the ensuing year
based on actual values submitted by the generating company and licensees and
subsequent validation and approval by the Commission during true-up.
(b)
The items in the ARR shall be treated as ‘controllable’ or ‘uncontrollable’ as follows: -
ARR Element
Controllable/ Uncontrollable
Interest and Finance Charges
Controllable
Return on Equity
Controllable
Availability
Controllable
Plant availability factor
Controllable
Heat Rate
Controllable
Auxiliary Energy Consumption
Controllable
PART III]
HARYANA GOVT. GAZ., NOV. 12, 2019 (KRTK. 21, 1941 SAKA)
417
ARR Element
Controllable/ Uncontrollable
Secondary Fuel Oil Consumption (SFC)
Controllable
O&M
Expenses
(excluding
terminal
liabilities with regard to employees on
account of changes in pay scales or
dearness allowance due to inflation)
Controllable
Terminal
liabilities
with
regard
to
employees on account of changes in pay
scales or dearness allowance due to
inflation
Uncontrollable
Depreciation
Controllable
Transit loss of coal
Controllable
Capital Expenditure
Controllable
All statutory levies and taxes, if any
excluding tax on Income
Uncontrollable
Fuel Price (excluding that pertaining to
domestic
coal
procured
through
e-auction/open market and imported coal)
Uncontrollable
Fuel Price pertaining to domestic coal
procured through e-auction /open market
and imported coal
Controllable
GCV of Fuel (excluding domestic coal
procured through e-auction/open market
and imported coal)
Uncontrollable
GCV of domestic coal procured through
e-auction/open market and imported coal
controllable
Distribution
Losses
(technical
and
commercial including bad debts)
Controllable
Collection Efficiency
Controllable
Energy Sales (excluding interstate and
inter Discom energy sales)
Uncontrollable
Interstate and inter Discom energy sales
Controllable
Power Purchase Price (other than for
short-term power purchase and UI)
Uncontrollable
Power Purchase Price for short-term
power and UI
Controllable
Power Purchase Quantum (MU)
Controllable
Intra State Transmission losses
Controllable
Quality of Supply as per Standard of
Performance unless exempted
Controllable
Non-Tariff income
Uncontrollable
8.4
Norms: Commission shall determine norms for ‘controllable’ items and where the performance of the
utilities for their respective businesses is sought to be improved upon through incentive and penalty
framework, trajectory for specific variables may be stipulated. The variations in the controllable items
over and above the specified norms will be governed by incentive and penalty framework specified in
these Regulations.
HARYANA GOVT. GAZ., NOV. 12, 2019 (KRTK. 21, 1941 SAKA)
[ PART III
418
8.5
Forecast of expected revenue from tariff: The applicant shall develop forecasting mechanism of
expected revenue from tariff and charges and submit the same along with complete supporting details,
including but not limited to the details of past performance, proposed initiatives for achieving
efficiency or productivity gains, technical studies or secondary research and contractual arrangements,
to enable the Commission to assess the reasonableness of the forecast.
9.
CAPITAL INVESTMENT PLAN
9.1
The generating company and the licensees, in respect of their respective businesses, shall file, for
approval of the Commission, a capital investment plan along with the MYT petition for a period
covering at least the entire control period. The capital investment plan shall be project/scheme wise and
for each scheme/project shall include:
(a)
Purpose of investment
(b)
Capital Structure;
(c)
Capitalization Schedule;
(d)
Financing Plan including identified sources of investment;
(e)
Details of physical parameters / targets;
(f)
Cost-benefit analysis and payback period;
(g)
Envisaged reduction in O&M cost/losses;
(h)
Ongoing projects that will spill into the year under review and new projects (along with
justification) that will commence but may be completed within or beyond the control period.
9.2
Purpose of investment shall include:
(i)
for a generation company-
generation capacity growth, replacement of assets,
renovation and modernization, reduction in average
per unit cost of generation etc;
(ii)
for a transmission licensee-
power evacuation, system augmentation, network
expansion, replacement of assets, reduction in
transmission losses, improvement in transmission
service and reliability of supply, reduction in per
MW transmission cost, integration of renewable
energy sources, congestion management, frequency
and voltage regulation, IT related projects etc.
(iii)
for a distribution licensee-
meeting load growth/ sales forecast (MUs),
distribution loss reduction, non-technical loss
reduction, replacement of assets, meeting reactive
energy
requirements,
managing peak
shifting
requirements, congestion management, frequency
and voltage regulation, improvement in metering,
consumer services, collection efficiency, quality and
reliability of supply etc.
Note: The Capital Investment by transmission licensee(s) in network expansion shall be based on load
flow studies and in accordance with the requirements of Haryana Grid Code.
9.3
The capital investment plan, in case of a generation company, will be commensurate with generation
capacity growth, renovation & modernization requirements etc.
In case of a transmission licensee, the capital investment plan will be commensurate with
load/generation capacity growth and will be linked to improvement in quality of transmission service,
reliability, metering and reduction in transmission losses.
The capital investment plan in case of a distribution licensee shall be commensurate with sales forecast
(MUs) / load growth of the state, distribution/non-technical loss reduction targets, improvements
envisaged in metering, collection efficiency, reliability and quality of supply etc.
9.4
Capital Investment for renovation and modernization in case of a transmission licensee and a generation
company shall be made through an application with a detailed project report (DPR) elaborating the
following elements: (i) Complete scope and justification; (ii) Estimated life extension of the
generation/transmission asset; (iii) Improvement in performance parameters; (iv) Cost-benefit analysis;
PART III]
HARYANA GOVT. GAZ., NOV. 12, 2019 (KRTK. 21, 1941 SAKA)
419
(v) Phasing of expenditure; (vi) Milestones/Time lines (vii) Schedule of completion; (viii) Estimated
completion cost; (ix) Other aspects.
9.5
Capital investment plan shall incorporate list of schemes in order of priority so as to enable the
Commission to approve the schemes in that order and in case lesser amount of capital expenditure is to
be approved then the schemes of lower priority could be disapproved
9.6
The generation company and licensee shall submit all information / data required by the Commission
for approval of the capital investment plan.
9.7
In the normal course, the Commission shall not revisit the approved capital investment plan during the
control period. However, during the mid-year performance review and true-up, the Commission shall
monitor the year wise progress of the actual capital expenditure incurred by the generating company or
the licensee vis-à-vis the approved capital expenditure and in case of significant difference between the
actual expenditure viz-a-viz the approved expenditure, the Commission may true up the capital
expenditure, subject to prudence check, as a part of annual true up exercise on or without an application
to this effect by the generation company/licensee. The generating company and the licensee shall
submit the scheme-wise actual capital expenditure incurred along with the mid-year performance
review and true-up filing.
9.8
In case during the mid-year performance review, the actual cumulative capital expenditure incurred up
to the current year starting from first year of the control period, is less by more than 10% of the
approved cumulative capital expenditure, the Commission shall true-up the costs incidental to the actual
capital expenditure in the current year and remaining years of the control period.
Provided that the actual capital expenditure incurred shall be only for the schemes as per the
approved capital investment plan.
Provided that if the actual capital expenditure incurred is more than the approved capital
expenditure, the Commission shall not allow any true-up of the cost incidental to such variations.
9.9
In case the capital expenditure is required due to Force Majeure events for works which have not been
approved in the capital investment plan or for works that may have to be taken up to implement new
schemes approved by the State/Central Government, the generating company or the licensee shall
submit an application containing all relevant information along with reasons justifying emergency
nature of the proposed work seeking approval by the Commission. In the case of works or schemes,
other than those required on account of Force Majeure events, the Commission shall consider to give
approval only in those cases where the works / schemes are wholly / substantially financed by the State
/ Central Government or, in view of the Commission, shall benefit a large mass of consumers of the
State. The generating company or the licensee may take up the work prior to the approval of the
Commission only in case the delay in approval will cause undue loss and such emergency nature of the
scheme has been certified by the Board of the Directors and intimated to the Commission:
Provided that the generating company or the licensee shall submit the requisite details, as
required as per Regulation 9.1 above, within 10 days of the submission of the application for approval
of emergency work;
Provided further that for the purpose of Regulation 9.7 and 9.8, such approved capital
expenditure shall be treated as a part of actual capital expenditure incurred by the licensee as well as the
capital expenditure approved by the Commission.
9.10
In case the capital expenditure incurred for approved schemes exceeds the amount as approved in the
capital expenditure plan, the generating company or the transmission or the distribution licensee, as the
case may be, shall file an application with the Commission at the end of control period for truing up the
expenditure incurred over and above the approved amount. After prudence check, the Commission shall
pass an appropriate order on case to case basis. The true-up application shall contain all the requisite
information and supporting documents.
Provided that any additional capital expenditure incurred on account of time over run and / or
on unapproved schemes not covered under Regulation 9.9 or unapproved changes in scope of approved
schemes shall not be allowed by the Commission unless the generating company or the licensee, as the
case may be, is able to give adequate justification for the same.
9.11
The generating company, transmission and the distribution licensees shall also provide a copy of their
respective capital investment plans to each other at the time of filing of the same with the Commission
so as to enable them to carry out planning and network augmentation / strengthening activities in a co-
ordinated manner. The generating company, transmission and the distribution licensees shall,
HARYANA GOVT. GAZ., NOV. 12, 2019 (KRTK. 21, 1941 SAKA)
[ PART III
420
immediately after approval of their respective capital investment plans by the Commission, send copies
of the same to each other. In addition to above the distribution licensee shall also provide a copy of its
approved power procurement plan to the transmission licensee.
9.12
The generating company and transmission and distribution licensees shall, in general, extend all co-
operation to each other by providing data /information required for carrying out planning and network
augmentation / strengthening activities in a co-ordinated manner.
9.13
The Commission shall approve the capital investment plan within a period of 45 days from the date of
its filing or submission of complete information, whichever is later.
9.14
For the purpose of second control period, the timeline for submission of business plan by the
generating company and the licensees shall be as specified in Regulation 75 of these Regulations.
Provided that any capitalisation done by mere book entries / presentation in the financial
statements in order to comply with any statute / rules etc. and not in accordance with the Capital
Expenditure approved under these Regulations, shall not be allowed by the Commission. In such cases,
the licensees / generating company shall be required to prepare memorandum account of any such
capitalisation done and submit the same along with ARR / Tariff petition. No RoE, depreciation interest
cost etc. shall be allowable on the same.
9.15
To enable faster adoption of Electric vehicles in the State, the Utilities i.e., HPGCL, HVPNL, DHBVN
and UHBVNL shall endeavour to set up Public Charging Station (PCS) for charging Electric Vehicles
near to their Sub-Stations or any other appropriate place.
10.
BUSINESS PLAN
10.1
The generating company and the licensee, in respect of their respective businesses, shall file for
approval of the Commission a business plan for a period covering the entire control period along with
the MYT petition. The business plan shall provide the details for each year of the control period.
10.2
The business plan for a generating company shall be based on planned generation capacity growth and
shall contain among other things the following (i) generation forecasts; (ii) future performance targets;
(iii) proposed efficiency improvement measures; (iv) saving in operating costs; (v) Plan for reduction in
per unit/per MW cost of generation (vi) financial statements (which include balance sheet, profit and
loss statement and cash flow statement) - current and projected (at least for the control period duration)
along with basis of projections; (vii) any other new measure to be initiated by the Generating Company
e.g. IT initiatives, third party energy audit etc.
10.3
The business plan for transmission licensee shall be based on proposed generation capacity addition and
future load forecasts of the state and should contain among other things the following: (i) future plans/
performance targets of the company including efficiency improvement measures proposed to be
introduced (ii) plans for meeting reactive power requirements; (iii) plan for reduction in transmission
losses; (iv) plan for improvement in quality of transmission service and reliability; (v) metering
arrangements; (vi) Plan for reduction in per MW transmission cost, (vii) financial statements (which
include balance sheet, profit and loss statement and cash flow statement)- current and projected (at least
for the period of control period duration) along with basis of projections; (viii) any other new measure
to be initiated by the Licensee e.g. IT initiatives etc.
10.4
The business plan for distribution licensee shall be based on sales forecast (MUs)/load growth and
should contain among other things the following: (i) future plans/ performance targets of the company
including efficiency improvement measures proposed to be introduced (ii) plan for reduction in
distribution and non-technical losses;(iii) plan for improvement in quality of supply and reliability; (iv)
metering arrangements; (v) plan for improvement in collection efficiency (vi) plan for improvement in
consumer services/new consumer services (vii) Plan for reduction in O & M cost per MU of energy
sales (viii) MIS; (ix) scheme for third party energy audit (x) plan for improvement in metering and
billing; (xi) financial statements (which include balance sheet, profit and loss statement and cash flow
statement)- current and projected (at least for the period of control period duration) along with basis of
projections; (xii) any other new measure to be initiated by the Licensee(s) e.g. IT initiatives,
development of distribution franchisee, periodical business satisfaction surveys etc.
10.5
In case the accumulated commercial losses of a generating company or the licensees have substantially
eroded their respective paid up equity, the business plan shall also contain the proposal to progressively
reduce the accumulated commercial losses indicating various measures, including re-capitalisation,
proposed to be undertaken by the generation company/licensee to achieve turnaround of the company
within a specified period.
PART III]
HARYANA GOVT. GAZ., NOV. 12, 2019 (KRTK. 21, 1941 SAKA)
421
10.6
The generation company and the licensee shall submit all information / data as required by the
Commission for necessary approval of the business plan. The Commission shall scrutinize the business
plan taking into consideration the additional information provided by the applicant, if any.
10.7
The Commission shall approve the business plan within a period of 45 days from the date of its filing or
submission of complete information, whichever is later.
10.8 For the purpose of second control period, the timeline for submission of business plan by the
generating company and the licensees shall be as specified in Regulation 75 of these Regulations.
11.
MID-YEAR PERFORMANCE REVIEW AND TARIFF SETTING
11.1
The generating company and the licensee shall file an application for mid-year performance review,
true-up of previous year and tariff for the ensuing year not less than 120 days before the close of each
year of the control period, complete in all respects including the information in the existing formats as
per present practice, till such time new formats are finalised by the Commission.
11.2
The generating company and the licensees, within 7 (seven) days of filing of the application for mid-
year performance review and true-up, shall publish for information of the public, the contents of the
application filed with the Commission for mid-year performance review, true up of previous year and
approval of tariff for the ensuing year in an abridged form in such manner as the Commission may
direct and shall provide copies of the application and other documents filed with the Commission at a
price not exceeding normal photocopying charges. The generating company and the licensees shall also
host the application and other documents at their official websites.
11.3
The generating company and the licensee shall provide with the application for mid-year performance
review the details of actual capital expenditure and details of any statutory levies and actual operational
and cost data to enable the Commission to monitor the implementation of its order including
comparison of actual performance with the approved forecasts (and reasons for deviations). In addition
the generating company and the licensees shall also submit Annual Statement of Performance and
Accounts of their respective businesses (indicating the plant-wise cost data, and unit-wise performance
parameters in case of a generation company), a copy of latest audited accounts, analysis of detailed
reasons for losses, if any, and any other information which the Commission may require to assess the
reasons and extent of any variation in the performance from the approved forecast and the need for
tariff resetting.
11.4
In their application for performance review, true-up and tariff for ensuing year, the generating company
and the licensee shall submit information for the purpose of calculating expected expenditure and tariff
along with information on financial and operational performance for the previous year(s). The
information for the previous year should be based on audited accounts copies of which shall be supplied
along with the application. In case audited accounts for the previous year are not available, audited
accounts for the latest previous year should be filed along with unaudited accounts or provisional
accounts for all the succeeding years. The application should also include the proposal for tariff
revision, if any.
11.5
The scope of the mid-year performance review shall be a comparison of the performance of the
generation company and the licensees for the relevant financial year with the approved forecast of ARR
for their respective businesses and the performance targets specified by the Commission. Upon
completion of the mid-year performance review and truing up as per Regulation 13, the Commission
shall pass an order recording:
(a)
The revised approved ARR for such financial year including approved modifications, if any;
(b)
The approved aggregate gain or loss on account of controllable items and sharing of such gains
or losses;
(c)
Truing-up or pass through of uncontrollable items of ARR of previous year(s);
(d)
Pass through of variations in controllable items due to force majeure events, if any.
(e)
Pass through of variations in controllable items attributable to uncontrollable factors.
(f)
Tariff applicable for the ensuing year.
11.6
“The Commission shall review/consider, during the control period, the application made under this
Regulation as also the application for truing up of the ARR of the previous year, as per provision of the
Regulation 13, on the same principles as approved in the MYT order on the original application for
determination of ARR and tariff. The review / true–up for FY 2018-19 and FY 2019-20 shall, however,
be done on the same principles as approved in the tariff order for FY 2018-19 and for FY 2019-20.
HARYANA GOVT. GAZ., NOV. 12, 2019 (KRTK. 21, 1941 SAKA)
[ PART III
422
Upon completion of such review/truing up, either approve the proposed modification with such changes
as it deems appropriate, or reject the application for the reasons to be recorded in writing. The
Commission shall afford opportunity of being heard to the affected party in case it considers rejecting
the application.”
12.
INCENTIVE AND PENALTY FRAMEWORK (Sharing of gains & losses)
12.1
Various elements of the ARR of the generating company and the licensee will be subject to incentive
and penalty framework as per the terms specified in this Regulation. The overall aim is to incentivize
better performance and penalize poor performance, with the base level as per the norms / benchmarks
specified by the Commission.
12.2
The elements of ARR of generating company and licensees to which incentive and penalty framework
shall apply are as follows:
(a) Common for generating company and licensees
(i)
Operation & maintenance expenses-Applicable when the actual expenses fall below or
exceed the level specified by the Commission.
(ii)
Interest on new long-term loans- Applicable when interest rate falls below or exceeds
the level specified by the Commission.
(iii)
Restructuring of capital cost - Applicable when there is a benefit from restructuring of
capital cost.
(iv)
Interest on working capital- Applicable when interest rate falls below or exceeds the
level specified by the Commission
(vi)
Restructuring of loan portfolio- Applicable when there is a net benefit from
restructuring of loan portfolio
(b) Only for generation Company
(i)
Plant Availability Factor (PAF)- Applicable when actual PAF falls below or exceeds
the level specified by the Commission
(ii) Station heat rate (SHR)- Applicable when actual SHR falls below or exceeds the level
specified by the Commission
(iii)
Auxiliary Energy Consumption (AUX)- Applicable when actual AUX falls below or
exceeds the level specified by the Commission
(iv)
Specific Fuel Oil Consumption (SFC)- Applicable when actual SFC falls below or
exceeds the level specified by the Commission
(v) Transit loss of coal- Applicable when actual transit loss falls below or exceeds the level
specified by the Commission
Note: Until the Intra-State ABT Regulations are notified by the Commission, plant availability
factor for the generating company shall mean plant load factor
(c)
Only for Transmission Licensee
(i)
Availability- Applicable when actual availability falls below or exceeds the level
specified by the Commission. The incentive for actual availability above target
availability shall be worked out as per the following formula:
I = ATC X (AA – TA) / TA
Where
I = Incentive
ATC = Annual transmission charges
AA = Annual availability achieved (actual)
TA = Normative target availability.
Note 1: The incentive mechanism for availability shall be applicable only when the
transmission licensee submits detailed computation of the availability figures to the
Commission and the Commission approves the same. The detailed computation will
include all details of the input data, methods of recording the data (manual or through
PART III]
HARYANA GOVT. GAZ., NOV. 12, 2019 (KRTK. 21, 1941 SAKA)
423
electronic modes), formula used for computation and all other details required to
establish the current level of availability.
While reporting the level of availability to the Commission, the transmission licensee
shall enclose a certificate from the SLDC validating the indicated level of availability.
Note 2: For all purposes the ‘normative target availability factor’ shall be considered for
recovery of fixed charges. Any fall in the actual availability from the normative target
availability shall result in pro-rata reduction of fixed charges.
(d) Only for Distribution Licensee
(i)
Distribution losses - Applicable when actual distribution losses fall below or exceed the
level specified by the Commission
(ii)
Collection efficiency- Applicable when actual collection efficiency falls below or
exceeds the level specified by the Commission
(iii) Recovery of arrears - Applicable when actual recovery of arrears of previous years falls
below or exceeds the targets specified by the Commission
12.3
The gains / losses shall be computed item wise separately for each business. The computations shall be
based on the data submitted by the generating company and the licensees in the application for mid-
year performance review / true – up and audited annual accounts corresponding to the financial year.
12.4
In case of gain
The item wise gain shall be shared between the generating company or the licensee, as the case may be,
and their respective beneficiaries in the ratio of 50:50. However, the sharing ratio of 50:50 may be
revised to a maximum of 60:40 at the time of true-up during mid-year performance review / true-up.
The manner of utilization of the additional 10% gain shall be specified by the Commission from time to
time.
12.5 In case of loss
12.5.1 The item wise losses on account of controllable factors in case of a distribution licensee shall be
dealt with in the following manner:
(a)
The loss to the Distribution Licensee on account of Distribution losses, as may be
admitted by the Commission after prudence check, shall be dealt with as under:
(i)
One-third of the amount of such loss may be passed on as an additional charge in
tariff over such period as may be specified in the Order of the Commission; and
(ii)
The balance amount of loss shall be absorbed by the Distribution Licensee.
(b)
The item wise losses on account of other controllable factors, unless otherwise
specifically provided by the Commission, shall be borne by the distribution licensee.
12.5.2 The item wise losses on account of controllable factors in case of a generation
company/transmission licensee, unless otherwise specifically provided by the Commission, shall
be borne by the generation company/ transmission licensee.
13. TRUING-UP
13.1
Truing-up of the ARR of the previous year shall be carried out along with mid-year performance review
of each year of the control period only when the audited accounts in respect of the year(s) under
consideration is submitted along with the application. In case audited accounts pertaining to the year, of
which truing-up is to be undertaken, are not available, the generating company or the licensee as the
case may be, shall submit the provisional account duly approved by the Board of Directors of the
company/licensee.
13.2
Truing-up of uncontrollable items shall be carried out at the end of each year of the control period
through tariff resetting for the ensuing year and for controllable items shall be done only on account of
force majeure conditions and for variations attributable to uncontrollable factors.
13.3
The Commission shall allow carrying costs for the trued–up amount (positive or negative) at the
interest rates specified in these Regulations by adjusting the interest allowed on the working
capital requirement for the relevant year of the control period.
Upon completion of the mid-year performance review and truing up in accordance with these
regulations, the Commission shall pass an order recording:
(a)
The revised ARR for such financial year including approved modifications, if any;
HARYANA GOVT. GAZ., NOV. 12, 2019 (KRTK. 21, 1941 SAKA)
[ PART III
424
(b)
Holding cost for under/over recovered amount from the close of the relevant year and upto
the middle of the ensuing year of the control period whereupon the trued-up amount has been
adjusted by appropriate resetting of tariff in accordance with regulation 13.4, calculated as
additional borrowing for working capital for that period.
Provided that no carrying cost shall be allowed on account of delay in filing for true-up due
to unavailability of the audited accounts.
13.4
Over or under recoveries of trued-up amount in previous year(s) of the control period shall be allowed
to be adjusted in the ensuing year of the control period by appropriate resetting of tariff. The
unrecovered amount in the one control period shall be adjusted in the subsequent control period.
14.
REVIEW AT THE END OF THE CONTROL PERIOD
14.1
At the end of the second control period, the Commission shall review the achievement of objectives
and implementation of the principles of MYT laid down in these Regulations.
14.2
To meet the objectives of the Act, the National Electricity Policy and National Tariff Policy, the
Commission may revise the principles of MYT for the third and subsequent control periods.
14.3
The end of the second control period shall be the beginning of the third control period. The generating
company and the licensee shall follow the same procedure unless specified otherwise by the
Commission. The Commission shall analyse the performance with respect to the targets set out at the
beginning of the control period and shall determine the base values for the next control period on the
basis of actual performance achieved, expected improvement and other relevant factors.
PART III]
HARYANA GOVT. GAZ., NOV. 12, 2019 (KRTK. 21, 1941 SAKA)
425
PART III - COMPONENTS OF ARR AND TARIFF FOR GENERATION,
TRANSMISSION AND DISTRIBUTION BUSINESS
15.
COMPONENTS OF TARIFF FOR GENERATION BUSINESS
15.1
The tariff for sale of electricity from a thermal generating plant shall comprise of two parts, namely,
a.
Annual fixed charges (Capacity charges)
b.
Variable charges (Energy Charges)
15.2
Both the components will be worked out in the manner provided in these Regulations.
15.3
The fixed cost of generating plant (thermal or hydro) shall include the following elements:
(a)
Return on equity
(b)
Interest and financing charges on loan capital
(c)
Interest on working capital
(d)
Depreciation
(e)
Operation and maintenance expenses
(f)
Foreign exchange rate variation, if any
(g)
All statutory levies and taxes, if any, excluding taxes on income,
15.4
The Energy Charges (or variable charges) for a generating plant (thermal) shall comprise of primary
and secondary fuel cost.
15.5
For the hydro plants i.e. Western Yamuna Canal Hydro project, Bhudkalan and Kakroi Hydro Plants,
however, a single part tariff, based on a normative PLF and fixed cost worked out as per Regulation 34
hereinafter, may be determined by the Commission. Unless otherwise the Commission considers it
appropriate to determine the same under HERC RE Regulations in vogue.
16.
COMPONENTS OF TARIFF FOR TRANSMISSION AND SLDC BUSINESS
16.1 The following charges shall be recovered for the use of intra-state transmission system:
(a)
Transmission tariff or network usage charges, to reflect the cost of owning (Capital
Investment), servicing and maintaining the transmission assets in order to transfer bulk power to
and from different locations. The network usage charges or transmission tariff, payable by the
beneficiaries of the transmission system shall be designed to recover the Aggregate Revenue
Requirement of the transmission licensee approved by the Commission for each year of the
control period;
(b)
Reactive energy charges, to reflect the voltage related drawl of reactive energy as provided in
the Regulations hereinafter.
(c)
Short-term open access consumers shall pay the charges for usage of Transmission system
in terms Rs per kWh as specified in third proviso of regulation 50 (b).
16.2 SLDC charges, to reflect the cost of operating the State Load Dispatch Centre (SLDC) including the
cost of owning & maintaining it. These shall be levied as SLDC charges to the beneficiariesof the
services of SLDC in accordance with the provisions of theseRegulations
16.3 The ARR’s for the transmission business and SLDC business comprise of only fixed costs which shall
have the following components:
(a)
Return on equity (only for transmission business)
(b)
Interest and financing charges on Debt
(c)
Interest on working capital
(d)
Depreciation
(e)
Operation and maintenance expenses
(f)
Foreign exchange rate variation, if any
(g)
All statutory levies and taxes, if any, excluding taxes on income,
16.4
The transmission licensee, including the STU, shall submit ARRs separately for transmission business
and SLDC business and shall provide all the above information based on the segregated accounts for
its transmission business and for State Load Dispatch Centre (SLDC), a copy of which shall be
submitted to the Commission along with the application for tariff determination/review. .
HARYANA GOVT. GAZ., NOV. 12, 2019 (KRTK. 21, 1941 SAKA)
[ PART III
426
16.5
Connection charge- A consumer or a person seeking connectivity to the transmission system for Open
Access shall pay ‘connection charge’ to the transmission licensee as provided in HERC (Terms and
condition for grant of connectivity and open access for intra-State transmission and distribution system)
Regulations, 2012 as amended from time to time. Connection charges relate to cost of assets installed
solely for the use by an individual user and cost of such assets shall not be considered for determination
of transmission tariff.
17.
COMPONENTS OF TARIFF FOR DISTRIBUTION AND RETAIL SUPPLY BUSINESS
17.1
For distribution licensees, the commission shall determine (i) retail supply tariff for their retail supply
business i.e. sale of electricity to the consumers in their respective licensed areas which will be
inclusive of wheeling charges and (ii) wheeling tariff for their wheeling business which shall be for the
purpose of recovering wheeling charges from open access consumers falling in their respective licensed
areas.
17.2
The ARRs of the distribution licensee for retail supply business and wheeling business will comprise
the following elements:
ARR for Retail supply business
A - Expenses
(a) Return on equity
(b) Interest and financing charges on loan capital
(c) Interest on working capital
(d) Depreciation
(e) Operation and maintenance expenses
(f) Foreign exchange rate variation, if any
(g) All statutory levies, and taxes including taxes on
income, if any
(h) Bad and doubtful book debt allowed to be
written off
(i) Cost of power purchase
(j) Transmission charges
(k) any other expenses not mentioned above.
Total expenses – A
B - Income / receipts:
(a) Non – tariff income including revenue from
various surcharges
(b) Income from other business in accordance with
HERC Regulations, 2007 as amended from time
to time.
(c) Income from cross subsidy surcharge from open
access consumers
(d) Income from additional surcharge from open
access consumers
(e) Any grant, subvention, subsidy etc provided by
the State Government
Total Income / receipts – B
ARR for Retail supply business =
(A – B)
ARR for Wheeling business
A - Expenses
(a) Return on equity
(b) Interest and financing charges on loan
capital
(c) Interest on working capital
(d) Depreciation
(e) Operation and maintenance expenses
(f) Foreign exchange rate variation, if any
(g) All statutory levies and taxes,if any ,
excluding taxes on income,
(h) any other expenses not mentioned
above
Total expenses – A
B - Income / receipts:
(a) Non – tariff income
(b) Income from other business, to the
extent specified for wheeling tariff
Total Income / receipts – B
ARR for Wheeling business =
(A – B)
PART III]
HARYANA GOVT. GAZ., NOV. 12, 2019 (KRTK. 21, 1941 SAKA)
427
PART IV- GENERAL PRINCIPLES FOR DETERMINATION OF COMMON COMPONENTS OF ARR
AND TARIFF FOR GENERATION,
TRANSMISSION & DISTRIBUTION BUSINESS
18.
CAPITAL COST
(1)
The Capital cost as admitted by the Commission after prudence check and subject to debt-equity ratio
as per provisions of these Regulations, shall form the basis of determination of tariff for new power
projects.
Provided that where the power purchase agreement entered into between the generating
Company and the beneficiaries or transmission service agreement entered into between transmission
licensee and the long-term transmission consumer, as the case may be, provides for a ceiling of actual
expenditure, the capital expenditure shall not exceed such ceiling for determination of tariff;
Provided further that any person intending to establish, operate and maintain a generating plant
may make an application before the Commission for ‘in principle’ acceptance of the project capital cost
and financing plan before taking up a project. The petition shall contain information regarding salient
features of the project including the capacity, location, site specific features, fuel, beneficiaries, break-up
of the capital cost estimates, financial package, schedule of commissioning, reference price level,
estimated completion cost including foreign exchange components, if any, consent of beneficiary
licensees to whom the electricity is proposed to be sold etc;
Provided also that where the Commission has given ‘in principle’ acceptance to the estimates of
project capital cost and financing plan, the same shall be the guiding factor for applying prudence
check on the actual capital expenditure;
(2)
The Capital Cost of a new project shall include the following:-
(a)
the expenditure incurred or projected to be incurred up to the date of Commercial operation of
the project;
(b)
Interest during construction and financing charges, on the loans (i) being equal to 70% of the
funds deployed, in the event of the actual equity in excess of 30% of the funds deployed, by treating the
excess equity as normative loan, or (ii) being equal to the actual amount of loan in the event of the
actual equity less than 30% of the funds deployed;
(c)
Increase in cost in contract packages as approved by the Commission;
(d)
Interest during construction and incidental expenditure during construction as computed in
accordance with these Regulation.
(e)
capitalised Initial spares subject to the ceiling rates, as a percentage of the original Plant and
Machinery cost as on the cut-off date, as specified below: -
Generating
Company
1. Coal-based generating plants:
2.50%
2. Gas Turbine / Combined Cycle generating plants
4.00%
3. Hydro Generation Plants
1.50%
Transmission
licensee
1. Transmission lines
0.75%
2. Transmission substations
2.50%
3. Series compensation devices and HVDC stations
3.50%
Distribution
licensee
Distribution Business Projects
1.50%
Provided that:
(i)
where the generating station has any transmission equipment forming part of the
generation project, the ceiling norms for initial spares for such equipment shall be as per the
ceiling norms specified for transmission system under these Regulations:
(ii)
once the transmission project is commissioned, the cost of initial spares shall be restricted
on the basis of plant and machinery cost corresponding to the transmission project at the time of
truing up:
(iii)
for the purpose of computing the cost of initial spares, plant and machinery cost shall be
considered as on cut-off date excluding IDC, IEDC, Land Cost and cost of civil works. The
generator/licensee shall submit the breakup of head wise IDC & IEDC in its tariff application.
HARYANA GOVT. GAZ., NOV. 12, 2019 (KRTK. 21, 1941 SAKA)
[ PART III
428
(f)
expenditure on account of additional capitalization and de-capitalisation determined in
accordance with these Regulation;
(g)
any gain or loss on account of foreign exchange risk variation pertaining to the loan amount
availed during the construction period as approved by the Commission.
(h)
adjustment of revenue due to sale of infirm power in excess of fuel cost prior to the COD as
specified under these Regulations; and
(i)
adjustment of any revenue earned by using the assets before COD.
(3)
The capital cost in case of a new hydro generating station shall also include:
(a)
cost of approved rehabilitation and resettlement (R&R) plan of the project in conformity with
National R&R Policy and R&R package as approved; and
(b)
cost of the developer’s 10% contribution towards Rajiv Gandhi Grameen Vidyutikaran Yojana
(RGGVY) project in the affected area.
(4)
The capital cost with respect to thermal generating station, incurred or projected to be incurred on
account of the Perform, Achieve and Trade (PAT) scheme or to achieve Environmental Norms /
Statutory Norms of Government of India will be considered by the Commission on case to case basis
and shall include:
(a)
cost of plan proposed by developer in conformity with norms of PAT Scheme; and
(b)
sharing of the benefits accrued on account of PAT Scheme.
(5)
The following shall be excluded or removed from the capital cost of the existing and new project:
(a)
The assets forming part of the project, but not in use;
(b)
Decapitalisation of Asset;
(c)
In case of hydro generating station any expenditure incurred or committed to be incurred by a
project developer for getting the project site allotted by the State government by following a two-stage
transparent process of bidding; and
(d)
the proportionate cost of land which is being used for generating power from generating station
based on renewable energy:
Provided that any grant received from the Central or State Government or any statutory body or
authority for the execution of the project which does not carry any liability of repayment shall be
excluded from the Capital Cost for the purpose of computation of interest on loan, return on equity and
depreciation;
(6)
Capital cost to be allowed by the Commission for the purpose of determination of tariff for respective
businesses will be based on the capital investment plan prepared by the generating company or the
licensee, as the case may be, and approved by the Commission prior to the filing of application for
multiyear tariff by the generating company/licensees.
(7)
Restructuring of capital cost in terms of relative share of equity and loan component, subject to
provisions of Regulation 19, shall be permitted during the tariff period provided it does not affect tariff
adversely. Any benefit from such restructuring shall be subjected to incentive / penalty framework as
per Regulation 12.
(8)
The amount of any contribution made by the consumers, open access consumers and Government
subsidy towards works for connection to the distribution system or transmission system of the
distribution /transmission licensee, shall be deducted from the original cost of the project for the
purpose of calculating the amount under debt and equity under these Regulations.
18.1
Prudence Check of Capital Expenditure:
A.
Generating Company or the Transmission Licensee
Where the capital cost considered in tariff by the Commission on the basis of projected
additional capital expenditure exceeds the actual additional capital expenditure incurred on year
to year basis by more than 10%, the generating company or the transmission licensee shall
refund to the beneficiaries or the long term transmission customers as the case may be, the tariff
recovered corresponding to the additional capital expenditure not incurred, as approved by the
Commission, along with interest at 1.20 times of the bank rate as prevalent on 1st April of the
respective year.
Where the capital cost considered in tariff by the Commission on the basis of projected
additional capital expenditure falls short of the actual additional capital expenditure incurred by
PART III]
HARYANA GOVT. GAZ., NOV. 12, 2019 (KRTK. 21, 1941 SAKA)
429
more than 10% on year to year basis, the generating company or the transmission licensee shall
recover from the beneficiaries or the long term customers as the case may be, the shortfall in
tariff corresponding to difference in additional capital expenditure, as approved by the
Commission, along with interest at the bank rate as prevalent on 1st April of the respective year.
B.
Distribution Licensee
Any excess tariff recovered on account of variation in projected capitalization in the tariff order
vis-a-vis trued up capitalization by more than 10% during the year, shall be adjusted in the
Revenue Gap/Surplus of the relevant year along with interest rate at 1.20 times of the bank rate
prevalent on 1st April of respective year:
Provided that any excess tariff recovered on account of variation in projected
capitalization in the tariff order vis-a-vis trued up capitalization due to reasons beyond the
control of the Distribution Licensee i.e., delay in ‘In-principle’ approval of the schemes, road
cutting permission from the concerned agencies etc., shall be adjusted in the Revenue
Gap/Surplus of the relevant year along with interest rate equal to bank rate prevalent on 1st April
of respective year.
Any shortfall in tariff recovered on account of variation in projected capitalization in the tariff
order vis-a-vis trued up capitalization by more than 10% during the year, shall be adjusted in the
Revenue Gap/Surplus of the relevant year along with interest rate at 0.80 times of the bank rate
prevalent on 1st April of respective year.
The following principles shall be adopted for prudence check of capital cost of the existing or
new projects:
(1)
In case of the thermal generating station and the transmission system, prudence check of
capital cost may be carried out taking into consideration the benchmark norms specified/to be
specified by the Commission from time to time:
Provided that in cases where benchmark norms have not been specified, prudence check
may include scrutiny of the capital expenditure, financing plan, interest during construction,
incidental expenditure during construction for its reasonableness, use of efficient technology,
cost over-run and time over-run, competitive bidding for procurement and such other matters as
may be considered appropriate by the Commission for determination of tariff:
Provided further that in cases where benchmark norms have been specified, the
generating company shall submit the reasons for exceeding the capital cost from benchmark
norms to the satisfaction of the Commission for allowing cost above benchmark norms.
(2)
The Commission may issue new guidelines or at its discretion, get the capital cost of any
project, vetted by an independent agency or an external expert. However, the same shall be
considered as guiding factor only and not binding on the Commission as such.
(3)
The Commission may issue new guidelines or revise the existing guidelines for scrutiny
and approval of commissioning schedule of the hydro-electric projects in accordance with the
tariff policy issued by the Central Government under section 3 of the Act from time to time
which shall be considered for prudence check.
(4)
Where the power purchase agreement entered into between the generating company and
the beneficiaries provides for ceiling of actual capital expenditure, the Commission shall take
into consideration such ceiling for determination of tariff for prudence check of capital cost.
C.
Interest during construction (IDC), Incidental Expenditure during Construction (IEDC)
(A)
Interest during Construction (IDC)
(1)
Interest during construction shall be computed corresponding to the loan from the
date of infusion of debt fund, and after considering the prudent phasing of funds up to
SCOD.
(2)
In case of additional costs on account of IDC due to delay in achieving the SCOD,
the generating company or the licensee as the case may be, shall be required to furnish
detailed justifications with supporting documents for such delay including prudent
phasing of funds:
Provided that if the delay is not attributable to the generating company or the
licensee as the case may be, and is due to uncontrollable factors as specified in these
Regulations, IDC may be allowed after due prudence check:
HARYANA GOVT. GAZ., NOV. 12, 2019 (KRTK. 21, 1941 SAKA)
[ PART III
430
Provided further that only IDC on actual loan may be allowed beyond the SCOD
to the extent, the delay is found beyond the control of generating company , after due
prudence and considering prudent phasing of funds.
(B)
Incidental Expenditure during Construction (IEDC):
(1)
Incidental expenditure during construction shall be computed from the zero date
and after considering pre-operative expenses upto SCOD:
Provided that any revenue earned during construction period up to SCOD on
account of interest on deposits or advances, or any other receipts may be considered for
reduction in incidental expenditure during construction.
(2)
In case of additional costs on account of IEDC due to delay in achieving the
SCOD, the generating company or the transmission licensee as the case may be, shall be
required to furnish detailed justification with supporting documents for such delay
including the details of incidental expenditure during the period of delay and liquidated
damages recovered or recoverable corresponding to the delay:
Provided that if the delay is not attributable to the generating company or the
transmission licensee, as the case may be, and is due to uncontrollable factors, IEDC may
be allowed after due prudence check:
Provided further that where the delay is attributable to an agency or contractor or
supplier engaged by the generating company or the transmission licensee, the liquidated
damages recovered from such agency or contractor or supplier shall be considered for
computation of capital cost.
(3)
In case the time over-run beyond SCOD is not admissible after due prudence, the
increase of capital cost on account of cost variation corresponding to the period of time
over run may be excluded from capitalization irrespective of price variation provisions in
the contracts with supplier or contractor of the generating company.
Provided that following shall be considered as controllable and uncontrollable
factors leading to cost escalation impacting Contract Prices, IDC and IEDC of the
project:
(1)
The “controllable factors” shall include but shall not be limited to the following:
(a)
Variations in capital expenditure on account of time and/or cost over-runs
on account of land acquisition issues;
(b)
Efficiency in the implementation of the project not involving approved
change in scope of such project, change in statutory levies or force majeure
events; and
(c)
Delay in execution of the project on account of contractor, supplier or
agency of the generating company or transmission licensee.
(2)
The “uncontrollable factors” shall include but shall not be limited to the
following:
(i)
Force Majeure events; and
(ii)
Change in law.
Provided that no additional impact of time overrun or cost over-run shall be
allowed on account of non-commissioning of the generating station or associated
transmission system by SCOD, as the same should be recovered through
Implementation Agreement between the generating company and the transmission
licensee:
Provided further that if the generating station is not commissioned on the
SCOD of the associated transmission system, the generating company shall bear
the IDC [and IEDC] or transmission charges if the transmission system is declared
under commercial operation.
Provided also that if the transmission system is not commissioned on
SCOD of the generating station, the transmission licensee shall arrange the
evacuation from the generating station at its own arrangement and cost till the
associated transmission system is commissioned.
PART III]
HARYANA GOVT. GAZ., NOV. 12, 2019 (KRTK. 21, 1941 SAKA)
431
18.2
Additional capitalization
18.2.1 The Commission may consider allowing, subject to prudence check, any additional capital
expenditure incurred or projected to be incurred, after the commercial operation date of a project
and up to the cut-off date, on the following provided the same was part of the original scope of
work of the project:
(a)
Deferred liabilities without any carrying cost;
(b)
Works deferred for execution without any escalation;
(c)
Procurement of initial capital spares in the original scope of work without any escalation,
subject to ceiling specified above;
(d)
Foreign exchange rate variation;
(e)
Liabilities to meet award of arbitration provided that it is not on account of any fault of
the generation company or the licensee, as the case may be;
(f)
Liabilities on account of compliance of the order or decree of a court;
(g)
Liabilities on account of change in law:
Provided that details of the works included in the original scope of work along with
estimates of expenditure, un-discharged liabilities and works deferred for execution shall be
submitted along with the application for determination of tariff after the date of commercial
operation of the project;
18.2.2 The Commission may consider admitting, after prudence check, the capital expenditure of the
following nature actually incurred after the cut-off date:
(a)
Deferred liabilities relating to works / services within the original scope of work without
any escalation;
(b)
Liabilities to meet award of arbitration provided that it is not on account of any fault of
the generation company or the licensee, as the case may be;
(c)
Liabilities on account of compliance of the order or decree of a court;
(d)
Liabilities on account of change in law;
(e)
Any additional works / services which have become necessary for efficient and
successful operation of the project, but not included in the original project cost;
18.2.3 Impact of additional capitalization in tariff revision within the approved project cost shall be
considered by the Commission once during a particular financial year of the control period.
18.2.4 In case of a transmission licensee, any additional expenditure on items such as relays, control &
instrumentation, computer system, power line carrier communication, DC batteries, replacement
of switchyard equipment due to increase of fault level, emergency restoration system, insulators
cleaning infrastructure, replacement of damaged equipment not covered by insurance and any
other expenditure which has become necessary for successful and efficient operation of
transmission system may be admitted by the commission subject to prudence check provided
that such replacement has not been necessitated due to any fault attributable to the transmission
licensee :
Provided that any expenditure on acquiring the minor items or the assets like tools and
tackles, furniture, air conditioners, voltage stabilizers, refrigerators, coolers, fans washing
machines, heat convectors, mattresses, carpets etc. bought after the cut-off date shall not be
considered for additional capitalization for determination of tariff.
Note 1: Any expenditure admitted on account of committed liabilities within the original scope
of work and the expenditure deferred on techno-economic grounds but falling within the original
scope of work shall be serviced in the normative debt-equity specified in these Regulations;
Note 2: Any expenditure on replacement of old assets or renovation and modernization or life
extension shall be considered after excluding the entire depreciated value or value of the scrap,
whichever is higher, of the original assets from the original capital cost of the assets replaced;
Note 3: Any expenditure admitted by the Commission for determination of tariff on account of
new works not in the original scope of work shall be serviced in the normative debt-equity
specified in these Regulations.
HARYANA GOVT. GAZ., NOV. 12, 2019 (KRTK. 21, 1941 SAKA)
[ PART III
432
18.2.5 Provided also that if any expenditure has been claimed under Renovation and Modernization
(R&M), repairs and maintenance under O&M expenses and Compensation Allowance, same
expenditure cannot be claimed under this Regulation.
18.2.6 In case of de-capitalization of assets of a generating company or the transmission licensee, as the
case may be, the original cost of such asset as on the date of decapitalization shall be deducted
from the value of gross fixed asset and corresponding loan as well as equity shall be deducted
from outstanding loan and the equity respectively in the year such de-capitalization takes place,
duly taking into consideration the year in which it was capitalized.
18.2.7 The scrutiny of the project cost estimates by the Commission shall include the reasonableness of
the capital cost, financing plan, interest during construction, use of efficient technology and such
other matters for the purposes of determination of tariff.
18.3 Renovation and Modernization:
(1)
The generating company or the transmission licensee, as the case may be, for meeting the
expenditure on renovation and modernization (R&M) for the purpose of extension of life beyond the
originally recognized useful life for the purpose of tariff of the generating station or a unit thereof or the
transmission system or an element thereof, shall make an application before the Commission for
approval of the proposal with a Detailed Project Report giving complete scope, justification, cost-
benefit analysis, estimated life extension from a reference date, financial package, phasing of
expenditure, schedule of completion, reference price level, estimated completion cost including foreign
exchange component, if any, and any other information considered to be relevant by the generating
company or the transmission licensee.
(2)
Where the generating company or the transmission licensee, as the case may be, makes an
application for approval of its proposal for renovation and modernization, the approval shall be granted
after due consideration of reasonableness of the cost estimates, financing plan, schedule of completion,
interest during construction, use of efficient technology, cost-benefit analysis, and such other factors as
may be considered relevant by the Commission.
(3)
In case of gas/ liquid fuel based open/ combined cycle thermal generating station, any
expenditure which has become necessary for renovation of gas turbines/steam turbine after 25 years of
operation from its COD and an expenditure necessary due to obsolescence or non-availability of spares
for efficient operation of the stations shall be allowed:
Provided that any expenditure included in the R&M on consumables and cost of components and spares
which is generally covered in the O&M expenses during the major overhaul of gas turbine shall be
suitably deducted after due prudence from the R&M expenditure to be allowed.
(4)
Any expenditure incurred or projected to be incurred and admitted by the Commission after
prudence check based on the estimates of renovation and modernization expenditure and life extension,
and after deducting the accumulated depreciation already recovered from the original project cost, shall
form the basis for determination of tariff.
19.
DEBT EQUITY RATIO
19.1
Existing projects - In case of the existing projects declared under commercial operation prior to
1st April 2020, debt-equity ratio as allowed by the Commission for determination of tariff for the
period ending 31st March 2020 shall be considered.
19.2 New projects - For new projects commissioned or whose capacity is expanded onor after 1st April 2020:
(a)
A Normative debt-equity ratio of 70:30 shall be considered for the purpose of determination of
Tariff;
(b)
In case the actual equity employed is in excess of 30%, the amount of equity for the purpose of
tariff determination shall be limited to 30%, and the balance amount shall be considered as
normative loan;
(c)
In case the actual equity employed is less than 30%, then the actual debt-equity ratioshall be
considered;
(d)
The premium, if any, raised by the generating company or the licensee while issuing share
capital and investment of internal accruals created out of free reserve, shall also be reckoned as
paid up capital for the purpose of computing return on equity subject to the normative debt
equity ratio of 70:30, provided such premium amount and internal accruals are actually utilized
for meeting capital expenditure and form part of the approved financial package. For the
PART III]
HARYANA GOVT. GAZ., NOV. 12, 2019 (KRTK. 21, 1941 SAKA)
433
purposes of computation of return, the portion of free reserves utilized for meeting the capital
expenditure shall be considered from the date the asset created is productively deployed in the
business.
19.3 Renovation and modernization
Any approved capital expenditure incurred by the generating company or the licensee on renovation
and modernization of project (to be submitted as part of the capital investment plan) shall be
considered to be financed at normative debt-equity ratio of 70:30. If the actual equity employed is less
than 30%, then the actual debt equity ratio, subject to lower limit as per company law, shall be
considered.
Provided that:
In case of de-capitalisation or retirement or replacement of assets, the equity capital approved as mentioned
above, shall be reduced to the extent of 30% (or actual equity component based on documentary evidence, if it
is lower than 30%) of the original cost of the de-capitalised or retired or replaced asset, and the debt capital
approved as mentioned above, shall be reduced to the extent of actual debt component, based on documentary
evidence, of the original cost of the decapitalised or retired or replaced asset:
In case of Generating Station or a transmission system or distribution system, which has completed its useful
life as on or after 1.4.2020, the accumulated depreciation as on the completion of the useful life less
cumulative repayment of loan shall be utilized for reduction of the equity and depreciation admissible after the
completion of useful life and the balance depreciation, if any, shall be first adjusted against the repayment of
balance outstanding loan and thereafter shall be utilized for reduction of equity.
20.
RETURN ON EQUITY
20.1 The rate of return on equity shall be decided by the Commission keeping in view the incentives and
penalties and on the basis of overall performance subject to a ceiling of 14% provided that the ROE
shall not be less than the net amount of incentive and penalty.
20.2
Return on equity shall be allowed on equity employed in assets in use considering the following and
subject to Regulation 20.1 above:
i.
Equity employed in accordance with Regulation 19.1 and 19.2 on assets (in use) commissioned
prior to the beginning of the year; plus
ii.
50% of equity capital portion of the allowable capital cost for the assets put to use during the
year.
Provided that for the purpose of truing up, return on equity shall be allowed from the
COD on pro-rata basis based on documentary evidence provided for the assets put to
commercial operation during the year.
Provided further that assets funded by consumer contributions, capital subsidies/
Government grants shall not form part of the capital base for the purpose of calculation of
Return on Equity.
20.3
Return on equity invested in work in progress shall be allowed from the actual date of commercial
operation of the assets.
20.4
There shall be no Return on Equity for the equity component above 30%.
21. INTEREST ON LOAN CAPITAL
21.1 Existing loans
(i)
Interest on loan capital shall be computed loan-wise for existing loans arrived in a manner
specified in Regulation 19 and shall be as per the rates approved by the Commission.
(ii)
The loan outstanding as on 1st April of each financial year shall be worked out as the gross loan
in accordance with Regulation 19 by deducting the cumulative repayment as admitted by the
Commission up to 31st March of previous financial year from the gross normative loan;
(iii)
The rate of interest shall be the weighted average rate of interest on institutional loans calculated
on the basis of the actual loan portfolio at the beginning of each year applicable to the project. In
case the weighted average rate is not available, the interest rate approved by the Commission in
its earlier tariff order shall be allowed.
HARYANA GOVT. GAZ., NOV. 12, 2019 (KRTK. 21, 1941 SAKA)
[ PART III
434
Provided that if there is no actual loan for a particular year but normative loan is still
outstanding, the last available weighted average rate of interest shall be considered;
Provided further that if the generating plant/project does not have actual loan, then the
weighted average rate of interest of the generating company/licensee as a whole shall be
considered.
(iv) The interest on loan shall be calculated on the normative average loan of the year by applying
the weighted average rate of interest;
(v)
The generating company and the licensee shall from time to time review their capital structure
i.e. debt and equity and make every effort to restructure the loan portfolio as long as it results in
net savings on interest. The costs associated with such re-financing shall be borne by the
beneficiaries and the net savings (after deducting the cost of re-financing) shall be subjected to
incentive / penalty framework as mentioned in the Regulation 12 which shall be dealt with at the
time of mid-year performance review/true-up.
(vi) The changes to the loan terms and conditions shall be reflected from the date of such re-
financing and benefit passed on to the beneficiaries;
(vii) In case of any dispute relating to re-financing of loan, any of the parties may approach the
Commission with proper application along with all the relevant details. During the pendency of
any dispute, the beneficiaries shall not withhold any payment on account of orders issued by the
Commission.
(viii) In case any moratorium period on repayment of loan is availed of by the generating company or
the licensee, depreciation provided for in the tariff during the years of moratorium shall be
treated as repayment during those years and interest on loan capital shall be calculated
accordingly. Provided that the repayment for each year of the control period shall be deemed to
be equal to the depreciation allowed for the corresponding year.
21.2
New loans (on or after 1st April 2020)
(i) Rate of interest on new loans i.e. on or after 01.04.2020 shall be equal to the marginal cost of
funds-based lending rate (MCLR) of the SBI plus a maximum of 150 basis points w.r.t. 1st April
of the relevant financial year. They shall however, be required to submit due justification to the
Commission for the terms and conditions of the loans raised by them including the loan sanction
letter from the banks/ lending institutions, indicating the applicable rate of interest.
Provided that interest and finance charges on works in progress shall be excluded and
shall be considered as part of the capital cost;
Provided further that neither penal interest nor overdue interest shall be allowed for
computation of Tariff.
(ii)
Any variation above or below the allowed interest rate shall be subject to the incentive and
penalty framework specified in Regulation 12. The incentives on refinancing should be net of
costs.
(iii)
The amount of loan shall be arrived in the manner as specified in Regulation 19 and shall be
based on the approved capital investment plan.
(iv)
In case any moratorium period on repayment of loan is availed of by the generating company or
the licensee, depreciation provided for in the tariff during the years of moratorium shall be
treated as repayment during those years and interest on loan capital shall be calculated
accordingly.
21.3
The interest computation shall exclude interest on loan amount, normative or otherwise, to the extent of
capital cost funded by Consumer Contributions, Grants or Deposit Works carried out by Transmission
Licensee or Distribution Licensee or Generating Company, as the case may be.
21.4
Interest shall be allowed on the amount held as security deposit held in cash from Transmission System
Users, Distribution System Users and Retail consumers, at the Bank Rate as on 1st April of the
financial year in which the petition is filed provided it is payable by the transmission/distribution
licensee.
PART III]
HARYANA GOVT. GAZ., NOV. 12, 2019 (KRTK. 21, 1941 SAKA)
435
22.
INTEREST ON WORKING CAPITAL
22.1 Components of working capital:
For the purpose of computing working capital the components mentioned in the table below shall be
considered:
Generating company
I.
Coal-based Thermal Generating Plants:
(a)
Cost of coal for 1 month corresponding to the normative availability (same for pit
head);
(b)
Cost of secondary fuel oil for 1 month corresponding to the normative availability;
(c)
Normative O&M expenses for 1 (one) month;
(d)
Maintenance spares @ 10% of the O&M expenses;
(e)
Receivables equivalent to fixed and variables charges for 1(one) month for sale of
electricity calculated corresponding to normative availability.
II.
Open-cycle / Combined Cycle Gas Turbine Thermal Generating Plants:
(a)
Fuel cost for 1 (one) month corresponding to the normative annual plant availability
factor, duly considering mode of operation of the generating plant on gas fuel and
liquid fuel;
(b)
Liquid fuel stock for ½ month corresponding to the normative annual plant availability
factor, and in case of use of more than one liquid fuel, cost of main liquid fuel;
(c)
Maintenance spares @ 15% of normative operation and maintenance expenses;
(d)
Normative operation and maintenance expenses for one month.
(e)
Receivables equivalent to capacity charges and energy charges for 1 (one) months for
sale of electricity calculated on normative plant availability factor, duly considering
mode of operation of the generating plant on gas fuel and liquid fuel; and
III.
Hydro power plants:
(a)
Normative operation and maintenance expenses for 1 (one) month;
(b)
Maintenance spares @ 7.5% of normative operation and maintenance expenses;
(c)
Receivables equivalent to fixed cost for 2 (two) months.
Transmission licensee
(a)
Normative O&M expenses for 1 (one) month;
(b)
Maintenance spares @ 15% of the O&M expenses;
(c)
Receivables equivalent to 1 (one) month of fixed cost calculated on normative / target
availability Less amount held as security deposits from Users except security deposits held in
the form of Bank Guarantees;
Provided that at the time of truing up for any year, the working capital requirement shall be
re-calculated on the basis of the values of components of working capital approved by the
Commission in the truing up.
Distribution licensee
I.
Wheeling of electricity:
(a)
Normative O&M expenses for wheeling business for 1 (one) month;
(b)
Maintenance spares for 1 (one) month based on annual requirement considered at 1%
of GFA (wire business) at the end of the previous year;
(c)
Receivables equivalent to 1(one) month of wheeling charges.
less
Amount held as security deposits in cash from Distribution System Users :
Provided further that for the purpose of Truing-up for any year, the working capital
requirement shall be re-computed on the basis of the values of components of working capital
approved by the Commission in the Truing-up before sharing of gains and losses.
HARYANA GOVT. GAZ., NOV. 12, 2019 (KRTK. 21, 1941 SAKA)
[ PART III
436
II.
Retail supply of electricity:
(a)
Normative O&M expenses for retail supply business for 1 (one) month;
(b)
Maintenance spares for 1 (one) month based on annual requirement considered at 1%
of the GFA at the end of the previous year;
(c)
Uncollected revenue to be calculated as: Revenue billed for the relevant
year * (1 – Normative Collection efficiency);
(d)
Receivables equivalent to 1 (one) month of billing less consumers’ security / advance
consumption deposit.
Provided that for the purpose of Truing-up for any year, the working capital
requirement shall be re-computed on the basis of the values of components of working capital
approved by the Commission in the Truing-up before sharing of gains and losses;
22.2 Rate of Interest
Rate of interest on working capital shall be equal to the MCLR of the relevant financial year plus a maximum
of 150 basis points. However, while claiming any spread, the generator and the licensees shall submit loan
sanction letter from the banks/ lending institutions, indicating the applicable rate of interest.
For the purpose of truing up, the actual weighted average Rate of Interest will be considered on the normative
working capital by the Commission, subject to the ceiling margin as indicated above.
23. DEPRECIATION
For the purpose of tariff determination, the depreciation shall be calculated in the following manner: -
(a)
The value base of asset shall be the historical capital cost of the asset as admitted by the Commission.
The historical capital cost shall include additional capitalization including foreign exchange rate
variation, if any already allowed by the Commission up to 31st March of the relevant year.
(b)
The residual value of the asset shall be considered as 10% and depreciation shall be allowed up to
maximum of 90% of historical capital cost of the asset;
Provided that the salvage value for IT equipment and software shall be considered as NIL and
100% value of the assets shall be considered depreciable.
(c)
Depreciation shall be calculated annually over the useful life of the asset at the rates specified in
Appendix II up to 31st March of the 12th year from the date of commercial operation of the asset. From
1st April of 13th year from the commercial date of operation of the asset, the remaining depreciable
value if any out of the 90% of the capital cost of the asset shall be equally spread over the balance
useful life of the asset.
The deprecation rates given in Appendix-II will be applicable w.e.f. 1.04.2020 only. The depreciation,
in case of existing assets, up to 31.03.2020 shall be considered as already allowed and shall not be re–
visited. The deprecation rates as per Appendix-II for such assets shall be applicable w.e.f 1.04.2020 up
to 12th year from the date of COD.
Provided that the rate provided in Appendix II, are the upper ceiling of the rate of depreciation to be
provided up to 12th year from the date of COD and the developer shall have the option of indicating,
while seeking approval for tariff, lower rate of depreciation, subject to the aforesaid ceiling.
(d)
Land shall not be considered as a depreciable asset and cost shall be excluded from the capital cost
while computing depreciable value of asset.
(e)
Depreciation shall be chargeable from the first year of commercial operation. In case of commercial
operation of the asset for part of the financial year, then the depreciation shall be charged on pro rata
basis;
(f)
Depreciation shall not be allowed on assets (or part of assets) funded by consumer contribution
(i.e., any receipts from consumers that are not treated as revenue) and capital subsidies / grants.
Provision for replacement of such assets shall be made in the capital investment plan.
24. FOREIGN EXCHANGE RATE VARIATION
24.1
The generating company or the licensee, as the case may be, may hedge foreign exchange exposure in
respect of the interest on foreign currency loan and repayment of foreign loan acquired for the project
in part or full at their discretion to safeguard their interest against extraordinary variations in the foreign
exchange rates.
PART III]
HARYANA GOVT. GAZ., NOV. 12, 2019 (KRTK. 21, 1941 SAKA)
437
24.2
The generating company or the licensee shall recover the cost of hedging of foreign exchange rate
variation corresponding to the normative foreign debt, in the relevant year on year-to-year basis as
expense in the period in which it arises and no extra rupee liability corresponding to such foreign
exchange rate variation shall be allowed against the hedged foreign currency debt;
24.3
To the extent the generating company or the licensee is not able to hedge the foreign exchange
exposure, then to that extent, the extra rupee liability towards interest payment and loan repayment
corresponding to the normative foreign currency loan in the relevant year shall be permissible provided
it is not attributable to the generating company/licensees or their contractors.
24.4
The generating company/the licensee shall recover the cost of hedging and foreign exchange rate
variations on year to year basis as income or expense in the period in which it arises.
24.5
Any gain or loss on account of foreign exchange rate variation pertaining to the loan amount availed
during the construction period shall form part of the capital cost.
25. INCOME TAX
Income tax, if any, on the income stream of the generating company or the licensee shall not be treated as an
expense or a pass-through component in the tariff and shall be payable by the generating company or the licensees on
their own.
26. INCOME FROM OTHER BUSINESS
The generation company and the licensees may engage in any other business for optimum utilization of their
assets with prior intimation to the Commission. Such instances and transactions shall be governed in accordance with
the Treatment of Income of Other Businesses of Transmission Licensee(s) and Distribution Licensee(s), Regulations,
2007 notified by the Commission, as amended from time to time:
Provided that the licensee shall follow a reasonable basis for allocation of all joint and common costs between
the core/licensed business and the other business and shall submit the allocation statement as approved by the Board
of Directors to the Commission along with his application for determination of tariff;
Provided further that where the sum total of the direct and indirect costs of such other business exceed the
revenues from such other business or for any other reason, no amount shall be allowed to be added to the aggregate
revenue requirement of the generation company or the licensees, as the case may be, on account of such other
business.
27 A. PRIOR PERIOD EXPENSES
27.1
The utility may submit to the Commission the prior period expenses as a part of the filing for truing up;
27.2
The Commission may allow prior period expenses for uncontrollable cost items only as per the audited
accounts during truing up.
HARYANA GOVT. GAZ., NOV. 12, 2019 (KRTK. 21, 1941 SAKA)
[ PART III
438
PART V- PRINCIPLES FOR DETERMINATION OF TARIFF AND NORMS OF OPERATION FOR
GENERATION BUSINESS
28.
NORMS OF OPERATION FOR THERMAL POWER STATIONS
(1)
Normative Annual Plant Availability Factor (NAPAF)
(a)
Existing Plants
Plant Name (Units)
MYT Period
2020-21
(%)
2021-22
(%)
2022-23
(%)
2023-24
(%)
2024-25
(%)
Panipat TPS (Unit 5)
85
Panipat TPS (Unit 6)
85
85
85
85
85
Panipat TPS (Unit 7)
85
85
85
85
85
Panipat TPS(Unit 8)
85
85
85
85
85
DCR TPS, Yamuna Nagar (Unit 1)
85
85
85
85
85
DCR TPS, Yamuna Nagar (Unit 2)
85
85
85
85
85
Rajiv Gandhi TPS, Khedar (Hisar)
(Unit 1)
85
85
85
85
85
Rajiv Gandhi TPS, Khedar (Hisar)
(Unit 2)
85
85
85
85
85
(b) New Plants Commissioned on or after 1st April 2020
Description
Normative Annual Plant Availability Factor (NAPAF) in %
85
(2) Auxiliary Energy Consumption
(a)
Existing Plants
Plant Name (Units)
MYT Period
2020-21
(%)
2021-22
(%)
2022-23
(%)
2023-24
(%)
2024-25
(%)
Panipat TPS (Units 5& 6)
9
9
9
9
9
Panipat TPS(Units 7 & 8)
8.50
8.50
8.50
8.50
8.50
DCR TPS, Yamuna Nagar
(Units 1&2)
8.50
8.50
8.50
8.50
8.50
Rajiv Gandhi TPS, Khedar
(Hisar) (Unit 1&2)
6
6
6
6
6
(b) New Plants Commissioned on or after 1st April, 2020
Description
Auxiliary Energy
Consumption (%)
(i) Coal-based Generating Plants(with natural draft
cooling tower or without cooling tower)*
With Steam driven boiler feed pumps
6.00
With Electrically driven boiler feed pumps
8.50
(ii) Gas Turbine Generating Plants
Combined Cycle
2.75
Open Cycle
1.00
For Coal-based generating stations with induced draft cooling towers, the norms shall be further
increased by 0.5%.
PART III]
HARYANA GOVT. GAZ., NOV. 12, 2019 (KRTK. 21, 1941 SAKA)
439
(3) Station Heat Rate
(a) Existing Plants
Plant Name
(Units)
MYT Period
2020-21
(kCal/kWh)
2021-22
(kCal/kWh
2022-23
(kCal/kWh
2023-24
(kCal/kWh)
2024-25
(kCal/kWh)
Panipat TPS
(Units 5&6)
2550
2550
2550
2550
2550
Panipat
TPS(Units 7 &
8)
2500
2500
2500
2500
2500
DCR
TPS,
Yamuna Nagar
(Units 1&2)
2344
2344
2344
2344
2344
Rajiv
Gandhi
TPS,
Khedar
(Hisar)
(Unit
1&2)
2387
2387
2387
2387
2387
Note: Station heat rate norms for DeenBandhuChhottu Ram TPS (Unit 1 and 2) and Rajiv
Gandhi TPS (Unit 1 and 2) have been determined considering their design heat rate as 2201
kCal/kWh and 2241 kCal/kWh respectively and multiplying the same with a factor of 1.065.
(b)
New Plants Commissioned on or after 1st April, 2020
(i) Coal-based Thermal
=1.065 X Design Heat Rate (kCal/kWh)
Generating Plants
Where the Design Heat Rate of a unit means the unit heat rate guaranteed by the supplier at
conditions of 100% MCR, zero percent make up, design coal and design cooling water
temperature/back pressure:
Provided that the design heat rate shall not exceed the following maximum design unit
heat rates depending upon the pressure and temperature ratings of the units:
Steam Pressure Rating (kg/cm2)
150
170
170
247
247
SHT/RHT (degree Celsius)
535/535
537/537
537/565
537/565
565/593
Type of Boiler Feed Pump
Electrical
Driven
Turbine
Driven
Turbine
Driven
Turbine
Driven
Turbine
Driven
Maximum Turbine Cycle Heat
Rate (kCal/kWh)
1955
1950
1935
1900
1850
Minimum Boiler Efficiency
Sub-Bituminous Indian Coal
0.85
0.85
0.85
0.85
0.85
Bituminous Imported Coal
0.89
0.89
0.89
0.89
0.89
Maximum Design Unit Heat
Rate (kCal/kWh)
Sub-Bituminous Indian Coal
2300
2294
2276
2235
2176
Bituminous Imported Coal
2197
2191
2174
2135
2079
Provided further that in case pressure and temperature parameters of a unit are different from above
ratings, the maximum design unit heat rate of the nearest class shall be taken;
Provided also that where unit heat rate has not been guaranteed but turbine cycle heat rate and boiler
efficiency are guaranteed separately by the same supplier or different suppliers, the unit design heat rate shall
be arrived at by using guaranteed turbine cycle heat rate and boiler efficiency.
HARYANA GOVT. GAZ., NOV. 12, 2019 (KRTK. 21, 1941 SAKA)
[ PART III
440
Note: In respect of units where the boiler feed pumps are electrically operated, the maximum design unit heat
rate shall be 40 kCal/kWh lower than the maximum design unit heat rate specified above with turbine driven
Boiler Feed Pump.
(ii)
Gas-based / Liquid fuel based thermal generating unit(s)/ block(s)
= 1.05 X Design Heat Rate of the unit/block for natural gas and
RLNG as fuel (kCal/kWh)
= 1.071 X Design Heat Rate of the unit/block for liquid fuel (kCal/kWh)
Where the Design Heat Rate of a unit/block shall mean the guaranteed heat rate for a
unit/block at 100% MCR and at site ambient conditions, zero percent make up, design
fuel and design cooling water temperature/back pressure.
(4)
Secondary Fuel Oil Consumption (SFC)
(a)
Existing Plants
Plant Name
(Units)
MYT Period
2020-21
(ml/kWh)
2021-22
(ml/kWh)
2022-23
(ml/kWh)
2023-24
(ml/kWh)
2024-25
(ml/kWh)
Panipat TPS (Unit
5&6)
1.0
1.0
1.0
1.0
1.0
Panipat TPS(Units
7 & 8)
0.5
0.5
0.5
0.5
0.5
DCR TPS, Yamuna
Nagar (Units 1&2)
0.5
0.5
0.5
0.5
0.5
Rajiv Gandhi TPS,
Khedar
(Hisar)
(Unit 1&2)
0.5
0.5
0.5
0.5
0.5
(b)
New Plants Commissioned on or after 1st April, 2020
Type
Norms
Coal-based Thermal Generating Plants
0.5ml/kWh
(5)
Operation and maintenance expenses:
The norms for O & M expenses (in Rs. Lac per MW) for the existing plants and the plants
Commissioned on orafter 1st April 2020 shall accordingly be as under:-
Plant (Unit)
MYT Period
2020-21
2021-22
2022-23
2023-24
2024-25
Panipat TPS (Unit 5)
25.64
26.66
27.73
28.84 29.99
Panipat TPS (Unit 6)
25.64
26.66
27.73
28.84 29.99
Panipat TPS (Unit 7)
23.76
24.71
25.70
26.73 27.80
Panipat TPS (Unit 8)
23.76
24.71
25.70
26.73 27.80
DCR TPS, Yamuna Nagar (Unit 1)
21.24
22.09
22.97 23.89
24.85
DCR TPS, Yamuna Nagar (Unit 2)
21.24
22.09
22.97 23.89
24.85
Rajiv Gandhi TPS (Unit 1)
12.87
13.38
13.92 14.47
15.05
Rajiv Gandhi TPS (Unit 2)
12.87
13.38
13.92 14.47
15.05
Provided that the above norms shall be multiplied by the following factors for additional units in
respective unit sizes for the units whose COD occurs on or after 1st April, 2020 in the same plant:
PART III]
HARYANA GOVT. GAZ., NOV. 12, 2019 (KRTK. 21, 1941 SAKA)
441
MW Class
Additional Unit No.
Multiplication factor
200/210/250 MW Class
Additional 6th units
0.90
Additional 7th or more units
0.85
300/330/350 MW Class
Additional 4th and 5th Unit
0.90
Additional 6th or more units
0.85
500 MW and above Class
Additional 3rd or 4th unit
0.90
Additional 5th and above units
0.85
(i)
Open Cycle /Combined Cycle Gas Turbine Generating Plants
(Rs. Lakhs / MW)
Year
Gas Turbine/Combined Cycle Generating
Plants other than small gas turbine power
generating plants
Small Gas Turbine Power
Generating Plants
2020-21
16.24
34.38
2021-22
16.76
35.48
2022-23
17.30
36.62
2023-24
17.85
37.79
2024-25
18.42
39.00
(6)
The norms for thermal power plants other than the existing plants listed above, whose tariff
determination falls under the jurisdiction of the Commission, shall be same as for the new plants given
in the sub clause (1) to (5) above corresponding to the capacity/type of the plant.
(7)
For the generating unitsthat undergo renovation and modernization: the Commission shall specify
a separate set of norms of operation to be adopted during the renovation and modernization period and
for the subsequent period. These norms shall be specified by the Commission on case to case basis as
part of the renovation and modernization capital investment approval and shall prevail over the norms
specified in these Regulations. The generation tariff shall be determined accordingly by the
Commission for such generating units.
29.
EXPENSES ON SECONDARY FUEL OIL FOR THERMAL POWER PROJECTS
(a)
Expenses on secondary fuel oil (in Rs.) shall be computed corresponding to normative secondary fuel
oil consumption (SFC) specified in this Regulation, in accordance with the following formula:
Expenses on secondary fuel oil (in Rs.) = SFC x LPSFi x NAPAF x 24 xNDY x IC x 10
Where,
SFC
=
Normative specific fuel oil consumption in ml/kWh;
LPSFi
=
Weighted average landed price of secondary fuel in Rs. / ml considered
initially;
NAPAF
=
Normative annual plant availability factor in percentage;
NDY
=
Number of days in a Year;
IC
=
Installed capacity in MW.
(b)
Initially, the landed cost of secondary fuel oil shall be considered based on the weighted average price
of secondary fuel oil during the three preceding months and in the absence of landed costs for the three
preceding months, latest procurement price for the generating plant, before the start of the year shall be
considered.
(c)
The secondary fuel oil expenses shall be subject to fuel price adjustment at the end of each year of tariff
period as per following formula:
=
SFC x NAPAF x 24 x NDY x IC x 10 x (LPSFy – LPSFi)
Where,
LPSFy = Weighted average landed price of secondary fuel oil for the Year in Rs./ml.
HARYANA GOVT. GAZ., NOV. 12, 2019 (KRTK. 21, 1941 SAKA)
[ PART III
442
30
RECOVERY OF ANNUAL FIXED CHARGES (CAPACITY) CHARGES FOR THERMAL POWER
PROJECTS
(a)
The fixed cost of a thermal generating station shall be computed on annual basis, based on norms
specified under these Regulations. Payment of capacity charge by the beneficiaries shall be on monthly
basis in proportion to allocated / contracted capacity. The total capacity charges payable for a
generating plant shall be shared by its beneficiaries as per their respective percentage share / allocation
in the capacity of the generating plant;
(b)
A generating plant shall recover full capacity charge at the normative annual plant availability factor
specified by the Commission. Recovery of capacity charge below the level of target availability shall be
on pro-rata basis. No capacity charge shall be payable at zero availability. Total recovered fixed
charges for a Unit up to the end of a month shall not be more than the admissible approved fixed
charges for that Unit as worked out corresponding to the cumulative PLF (after including deemed
generation) up to the end of that month. For example, at the end of 3rd month, if the deemed PLF is
80% and the normative PLF is 85%, the admissible approved fixed charges would be AFC/4 (0.80/
0.85) where AFC are the approved annual fixed charges. In case cumulative PLF at the end of 3rd
month is more than the normative PLF, the admissible approved fixed charges will be AFC/4;
(c)
The capacity charge payable to a thermal generating plant (in Rs.) for a calendar month shall be
calculated in accordance with the following formula: -
CC1= (AFC/12)( PAF1 / NAPAF ) subject to ceiling of (AFC/12)
CC2 =((AFC/6)( PAF2 / NAPAF ) subject to ceiling of (AFC/6)) – CC1
CC3 =((AFC/4) ( PAF3 / NAPAF ) subject to ceiling of (AFC/4)) – (CC1+CC2)
CC4 =((AFC/3) ( PAF4 / NAPAF ) subject to ceiling of (AFC/3)) – (CC1+CC2+CC3)
CC5 = ((AFC x 5/12) ( PAF5 / NAPAF ) subject to ceiling of (AFC x 5/12)) – (CC1+CC2 +CC3+CC4)
CC6 = ((AFC/2) ( PAF6 / NAPAF ) subject to ceiling of (AFC/2)) – (CC1+CC2+CC3+CC4 + CC5)
CC7= ((AFC x 7/12) ( PAF7 / NAPAF ) subject to ceiling of (AFC x 7/12)) – (CC1+CC2 +CC3 +CC4 + CC5
+ CC6)
CC8 = ((AFC x 2/3) ( PAF8 / NAPAF ) subject to ceiling of (AFC x 2/3)) – (CC1+CC2 +CC3 +CC4 + CC5 + CC6
+ CC7)
CC9 = ((AFC x 3/4) ( PAF9 / NAPAF ) subject to ceiling of (AFC x 3/4)) – (CC1+CC2 +CC3 +CC4 + CC5 + CC6
+ CC7+ CC8)
CC10=((AFC x 5/6) ( PAF10 / NAPAF ) subject to ceiling of (AFC x 5/6)) – (CC1+CC2 +CC3 +CC4 + CC5 + CC6
+ CC7 + CC8 + CC9)
CC11 = ((AFC x 11/12) ( PAF11 / NAPAF ) subject to ceiling of (AFC x 11/12)) – (CC1+CC2+CC3 +CC4 + CC5 +
CC6 + CC7 + CC8 + CC9 + CC10)
CC12 = ((AFC) ( PAFY / NAPAF ) subject to ceiling of (AFC)) – (CC1+CC2+CC3+CC4 + CC5 + CC6 + CC7 +
CC8 + CC9 + CC10 + CC11)
Provided that in case of generating station or unit thereof is under shutdown due to Renovation
and Modernization, the generating company shall be allowed to recover O&M expenses and interest on
loan only.
Where,
AFC = Annual fixed cost specified for the year, in Rupees.
NAPAF = Normative annual plant availability factor in percentage.
PAFn = Percent Plant availability factor achieved upto the end of the nth month.
PAFY = Percent Plant availability factor achieved during the Year
CC1, CC2, CC3, CC4, CC5, CC6, CC7, CC8, CC9, CC10, CC11 and CC12 are the Capacity Charges
of 1st, 2nd, 3rd, 4th, 5th, 6th, 7th, 8th, 9th, 10th, 11th and 12th months respectively.”
Note: Till Intra – State ABT is implemented, Plant Availability Factor (PAF), wherever mentioned, shall
mean Plant Load Factor (PLF). For working out annual PLF for the purpose of recovery of annual fixed
charges, deemed generation on account of backing down on the instructions of SLDC or on the request of
Discoms shall be included.
PART III]
HARYANA GOVT. GAZ., NOV. 12, 2019 (KRTK. 21, 1941 SAKA)
443
Provided that the Commission may, as an option, calculate the recovery of annual fixed
charges (Capacity) charges for thermal power points as provided below: -
The fixed cost of a thermal generating station shall be computed on annual basis based on the norms specified
under these regulations and recovered on monthly basis under capacity charge. The total capacity charge
payable for a generating station shall be shared by its beneficiaries as per their respective percentage share or
allocation in the capacity of the generating station. The capacity charge shall be recovered under two segments
of the year, i.e. High Demand Season (period of three months) and Low Demand Season (period of remaining
nine months), and within each season in two parts viz., Capacity Charge for Peak Hours of the month and
Capacity Charge for Off-Peak Hours of the month as follows:
Capacity Charge for the Year (CCy) =Sum of Capacity Charge for three months of High Demand Season
+Sum of Capacity Charge for nine months of Low Demand Season
(2) The Capacity Charge payable to a thermal generating station for a calendar month shall be calculated in
accordance with the following formulae:
Capacity Charge for the Month (CCm) =Capacity Charge for Peak Hours of the Month (CCp) +Capacity
Charge for Off-Peak Hours of the Month (CCop)
HARYANA GOVT. GAZ., NOV. 12, 2019 (KRTK. 21, 1941 SAKA)
[ PART III
444
PART III]
HARYANA GOVT. GAZ., NOV. 12, 2019 (KRTK. 21, 1941 SAKA)
445
Provided that in case of generating station or unit thereof under shutdown due to Renovation and
Modernisation, the generating company shall be allowed to recover O&M expenses and interest on loan
only.
Where,
CCm= Capacity Charge for the Month;
CCp= Capacity Charge for the Peak Hours of the Month;
CCop= Capacity Charge for the Off-Peak Hours of the Month;
CCpn= Capacity Charge for the Peak Hours of nth Month in a specificSeason;
CCopn= Capacity Charge for the Off-Peak of nth Month in a specific Season;
AFC = Annual Fixed Cost;
PAFMpn = Plant Availability Factor achieved during Peak Hours upto the end of nth Month in a
Season;
PAFMopn = Plant Availability Factor achieved during Off-Peak Hours upto the end of nth Month in a
Season;
NAPAF= Normative Annual Plant Availability Factor.
(3) Normative Plant Availability Factor for “Peak” and “Off-Peak” Hours in a month shall be
equivalent to the NAPAF specified in these Regulations. The number of hours of “Peak” and “Off-
Peak” periods during aday shall be four and twenty respectively. The hours of Peak and Off-Peak
periods during a day shall be declared by the SLDC at least a week in advance. The High Demand
Season (period of three months, consecutive or otherwise) and Low Demand Season (period of
remaining nine months, consecutive or otherwise) in a region shall be declared by the SLDC, at least
six months in advance:
Provided that SLDC, after duly considering the comments of the concerned stakeholders, shall declare
Peak Hours and High Demand Season in such a way as to coincide with the majority of the Peak Hours
and High Demand Season of the State to the maximum extent possible:
(4) Any under-recovery or over-recovery of Capacity Charge as a result of under achievement or over-
achievement, vis-à-vis the NAPAF in Peak and Off-Peak Hours of a Season (High Demand Season or
Low Demand Season, as the case may be) shall not be adjusted with under-achievement or over-
achievement, vis-à-vis the NAPAF in Peak and Off-Peak Hours of the other Season:
Provided that within a Season, the shortfall in recovery of Capacity Charge for cumulative Off-
Peak Hours derived based on NAPAF, shall be allowed to be off-set by over-achievement of PAF, if
any, and consequent notional over-recovery of Capacity Charge for cumulative Peak Hours in that
Season:
Provided further that within a Season, the shortfall in recovery of Capacity Charge for
cumulative Peak Hours derived based on NAPAF, shall not be allowed to be off-set by over-
achievement of PAF, if any, and consequent notional over-recovery of Capacity Charge for cumulative
Off-Peak Hours in that Season.
(5) The Plant Availability Factor achieved for a Month (PAFM) shall be computed in accordance with
the following formula:
Where,
AUX = Normative auxiliary energy consumption in percentage.
DCi = Average declared capacity (in ex-bus MW), for the ith day of the period i.e. the month or the
year as the case may be, as certified by the State load dispatch centre after the day is over.
IC = Installed Capacity (in MW) of the generating station
N = Number of days during the period
Note: DCi and IC shall exclude the capacity of generating units not declared under commercial
operation. In case of a change in IC during the concerned period, its average value shall be taken.
HARYANA GOVT. GAZ., NOV. 12, 2019 (KRTK. 21, 1941 SAKA)
[ PART III
446
(6) In addition to the capacity charge, an incentive shall be payable to a generating station or unit
thereof @ 65 paise/ kWh for ex-bus scheduled energy during Peak Hours and @ 50 paise/ kWh for ex-
bus scheduled energy during Off-Peak Hours corresponding to scheduled generation in excess of ex-
bus energy corresponding to Normative Annual Plant Load Factor (NAPLF) achieved on a cumulative
basis within each Season (High Demand Season or Low Demand Season, as the case may be), as
specified in these Regulations.
Provided that the generating company shall be required to file its calculations for recovery of capacity
charges as per the above two options separately for each year of the second control period.
Provided further that in case HPGCL’s power stations are backed down on the instructions of the
DISCOMs and at the same time the Discoms are drawing power at a lower rate from some other
sources i.e. generators, traders etc. or resorting to drawls under UI mechanism, the Discoms shall
compensate HPGCL to the extent of fixed cost corresponding to loss of generation due to backing
down. In such cases HPGCL shall have the right to sell power not scheduled by the Discoms to a third
party provided any revenue earned on this account shall first be adjusted against the fixed cost to be
recovered from the Discoms.
31
ENERGY CHARGES OR VARIABLE CHARGES FOR THERMAL POWER PROJECTS
(a)
The Energy charges or variable charges shall cover the main fuel cost & secondary fuel oil and shall be
payable for the total energy scheduled to be supplied to a beneficiary during the calendar month on ex-
power plant basis, at the specified variable charge rate, with fuel price adjustment.
(b)
The Energy charge for the month shall be worked out on the basis of ex-bus energy scheduled to be sent
out from the generating plant in accordance with the following formula:
Energy charge or variable charge (Rs)
= Energy Charge Rate (Rs. / kWh) x Scheduled Energy (ex-bus) for the month (kWh)
Note: Till the time intra state ABT is implemented, ‘scheduled energy’ may be read as ‘actual energy
sent’.
(c)
Energy charge rate (ECR) in Rs. per kWh on ex-power plant basis shall be determined to three decimal
places in accordance with the following formula:
(i)
In case secondary fuel Oil cost is the part of ECR:
[[{SHR-(SFCXCVSF) X LPPF}/CVPF]+(SFCXLPSF)]x{100/(100-Aux)}
(ii)
In case secondary fuel Oil cost is not the part of ECR
[{SHR-(SFCXCVSF) X LPPF}/CVPF]x{100/(100-Aux)}
Where
AUX
=
Normative auxiliary energy consumption in percentage;
CVPF
=
Gross calorific value of primary fuel as fired, in kCal per kg
or per litre as applicable;
CVSF
=
Gross calorific value of secondary fuel in kCal per ml;
ECR
=
Energy charge rate in Rs. per kWh sent out;
SHR
=
Normative Station Heat rate in kCal per kWh;
SFC
=
Normative Specific fuel oil consumption in ml/kWh
LPPF = Weighted average landed price of primary fuel in Rs./kg.
LPSF = Weighted average landed fuel cost of Secondary Fuel in Rs./ml during the month.
PART III]
HARYANA GOVT. GAZ., NOV. 12, 2019 (KRTK. 21, 1941 SAKA)
447
32
LANDED COST OF FUEL FOR THERMAL POWER PROJECTS
The landed cost of fuel for the month shall include price of fuel corresponding to the grade and quality of fuel
inclusive of royalty, taxes and duties as applicable, transportation cost by rail/road or any other means, for the
purpose of computation of energy charge and in case of coal, shall be arrived at after considering normative
transit/moisture and handling losses as percentage of the quantity of coal dispatched by the coal supply
company during the month as follows:
Non-pithead generating plants (up to 1000 KMs)
:
Upto 0.8%
Non-pithead generating plants (above 1000 KMs)
:
Upto 1.2%
Pit head generating plants
:
Upto 0.2%
33
PRIMARY FUEL PRICE ADJUSTMENT (FPA) FOR THERMAL POWER STATIONS
HPGCL shall claim FPA as per the details provided here under: -
Initially gross calorific value of coal shall be taken as per actual in the preceding financial year for which data is
available. Any deviation shall be adjusted based on the gross calorific value of coal received and burnt and
landed cost incurred by the generating company for procurement of coal on month to month basis. No separate
petition shall be required to be filed with the Commission for fuel price adjustment. In case of any dispute
related to primary fuel price adjustment, an appropriate application in accordance with Haryana Electricity
Regulatory Commission (Conduct of Business) Regulations, 2004, as amended from time to time or any
statutory re-enactment thereof, shall be made by the affected party before the Commission. For determining fuel
price adjustment (FPA) amount the following formula shall be adopted:-
Where,
FPA
=
Primary Fuel Price Adjustment in Paise/kWh;
SFCn
=
Normative Specific Fuel Oil consumption in ml. / kWh;
SHRn
=
Normative Gross Station Heat Rate in kCal / kWh;
ACn
=
Normative Auxiliary Energy Consumption in percentage;
Kos
=
Base value of GCV of fuel oil as taken for determination of base
energy charge in tariff order in kCal/ml;
Pcm
=
Weighted average price of coal as per the invoices submitted for the
month at the power station in Rs./MT;
Kcm
=
Weighted average GCV of coal fired at boiler front for the month in
KCal/Kg.;
Pcs
=
Base value of price of coal as taken for determination of base energy
charge in tariff order in Rs./MT;
Kcs
=
Base value of GCV of coal as taken for determination of base energy
charge in tariff order in KCal/Kg.
34
Technical Minimum Schedule
Technical Minimum Schedule for operation of Intra-State Coal based Generating Stations
1.
The technical minimum for operation in respect of a unit or units of an intra-State Generating Station, except
HPGCL’s power plants at Panipat, shall be 55% of MCR loading or installed capacity of the unit of at generating
station.
Provided that the above provision in the Regulation shall continue as an option available to the Commission
and shall be implemented as and when considered feasible by the Commission except for the HPGCL’s power plants of
old vintage at Panipat.
HARYANA GOVT. GAZ., NOV. 12, 2019 (KRTK. 21, 1941 SAKA)
[ PART III
448
2.
The intra-State Generator may be directed by SLDC concerned to operate its unit(s) at or above the technical
minimum but below the normative plant availability factor on account of grid security or due to the fewer schedules
given by the beneficiaries.
3.
Where the Generator, whose tariff is either determined or adopted by the Commission, is directed by the SLDC
concerned to operate below normative plant availability factor but at or above technical minimum, the said Generator
may be compensated depending on the average unit loading duly considering theforced outages, planned outages,
PLF, generation at generator terminal, energy sent out ex-bus, number of start-stop, secondary fuel oil consumption
and auxiliary energy consumption, in due consideration of actual and normative operating parameters of station heat
rate, auxiliary energy consumption and secondary fuel oil consumption etc. on monthly basis duly supported by
relevant data verified by SLDC.
Provided that:
(i)
In case of coal / lignite based generating stations, following station heat rate degradation or actual heat
rate, whichever is lower, shall be considered for the purpose of compensation: -
Sr. No.
Unit loading as a % of
Installed Capacity of the Unit
Increase in SHR
(for supercritical
units) (%)
Increase in SHR
(for sub-critical
units) (%)
1
85-100
Nil
Nil
2
75 - 84.99
1.25
2.25
3
65 - 74.99
2
4
4
55 - 64.99
3
6
(ii)
In case of coal / lignite based generating stations, the following Auxiliary Energy Consumption
degradation or actual, whichever is lower, shall be considered for the purpose of compensation:
Sr.
No.
Unit Loading (% of MCR)
% Degradation in AEC admissible
1
85 – 100
NIL
2
75 – 84.99
0.35
3
65 – 74.99
0.65
4
55 - 64.99
1.0
(iii)
Where the scheduled generation falls below the technical minimum schedule, the SLDC concerned
shall have the option to go for reserve shut down and in such cases, start-up fuel cost over and above seven (7)
start / stop in a year shall be considered as additional compensation based on following norms or actual,
whichever is lower:
Unit Size (MW)
Oil Consumption per start up (Kl)
Hot
Warm
Cold
200/210/250 MW
20
30
50
500 MW
30
50
90
660 MW
40
60
110
(iv)
In case of gas based intra-State Generating Station, compensation shall be decided based on the
characteristic curve provided by the manufacturer and after prudence check of the actual operating parameters
of Station Heat Rate, Auxiliary Energy Consumption, etc.
(v)
Compensation for the Station Heat Rate and Auxiliary Energy Consumption shall be worked out in
terms of energy charges.
PART III]
HARYANA GOVT. GAZ., NOV. 12, 2019 (KRTK. 21, 1941 SAKA)
449
(vi)
The compensation so computed shall be borne by the entity who has caused the plant to be operated at
schedule lower than corresponding to Normative Plant Availability Factor up to technical minimum based on
the compensation mechanism finalized by the SLDC.
(vii) No compensation for Heat Rate degradation and Auxiliary Energy Consumption shall be admissible if
the actual Heat Rate and / or actual Auxiliary Energy Consumption are lower than the normative Station Heat
Rate and / or normative Auxiliary Energy Consumption applicable to the unit or the generating station.
(viii) There shall be reconciliation of the compensation at the end of the financial year in due consideration of
actual weighted average operational parameters of station heat rate, auxiliary energy consumption and
secondary oil consumption.
(ix)
No compensation for Heat Rate degradation and Auxiliary Energy Consumption shall be admissible if
the actual Heat Rate and / or actual Auxiliary Energy Consumption are lower than the normative station Heat
Rate and/or normative Auxiliary Energy Consumption applicable to the unit or the generating station in a
month or after annual reconciliation at the end of the year.
4.
In case of a generating station whose tariff is neither determined nor adopted by the Commission, the
concerned generating company shall have to factor the above provisions in the PPAs entered into by it for sale of
power in order to claim compensations for operating at the technical minimum schedule. 5. The generating company
shall keep the record of the emission levels from the plant due to part load operation and submit a report for each year
to the Commission by 31st May of the year.
5.
The generating company shall keep the record of the emission levels from the plant due to part load operation
and submit a report for each year to the Commission by 31st May of the year.
6.
SLDC shall prepare a Detailed Operating Procedure in consultation with the generators and beneficiaries
within 2 months’ time and submit to the Commission for approval. The Detailed Operating Procedure shall contain
the role of different agencies, data requirements, procedure for taking the units under reserve shut down and the
methodology for identifying the generating stations or units thereof to be backed down upto the technical minimum in
specific Grid conditions such as low system demand, Regulation of Power Supply and incidence of high renewables
etc., based on merit order stacking.
7.
The SLDC shall work out a mechanism for compensation for station heat rate and auxiliary energy
consumption for low unit loading on monthly basis in terms of energy charges and compensation for secondary fuel
oil consumption over and above the norm of 0.5 ml/kWh for additional start-ups in excess of 7 start-ups, in
consultation with generators and beneficiaries including its sharing by the beneficiaries.
35
NORMS OF OPERATION AND DETERMINATION OF TARIFF FOR HYDRO POWER PLANTS
Norms of operation and determination of tariff for hydro power plants other than those covered under renewable
energy sources, shall be as under:-
34.1 The tariff for sale of electricity from a Hydro Generating Station shall comprise of two parts, namely, the
Capacity Charge and Energy Charge.
34.2 Annual Fixed Charges:
The Annual Fixed Charges shall comprise of the following elements:
(a)
Depreciation;
(b)
Interest and Finance Charges on Loan Capital;
(c)
interest on Working Capital;
(d)
Operation & Maintenance Expenses;
(e)
Return on Equity;
(0
Special allowance in lieu of Renovation &Modernization, wherever applicable;
(g)
SLDC Fees and Charges minus:
(h)
Non-Tariff lncome:
Provided that Depreciation, interest and finance charges on Loan Capital, Interest on Working Capital and
Return on Equity for Hydro Generating Stations shall be allowed in accordance with the provisions specified in these
Regulations:
HARYANA GOVT. GAZ., NOV. 12, 2019 (KRTK. 21, 1941 SAKA)
[ PART III
450
Provided further that prior period income/expenses shall be allowed by the Commission at the time of truing
up based on audited accounts, on a case to case basis,subject to prudence check.
34.3
The norms of operation for existing hydro generating stations for recovery of Annual Fixed Charges shall be
as under:-
Normative Annual Plant Availability Factor (%)
Auxiliary Consumption including Transformer
Losses (%)
80%
1
80%
1
The following Normative Annual Plant Availability Factor CNAPAF) shall apply to other hydro generating stations
for recovery of Annual Fixed Charges:
(a)
Storage and Pondage type plants with head variation between Full Reservoir Level (FRL) and Minimum Draw
Down Level (MDDL) of up to 80%, and where plant availability is not affected by silt: 90%
(b)
In case of storage and pondage type plants with head variation between full reservoir level and minimum draw
down level is more than 8% and when plant availability is not affected by silt, the month wise peaking capability as
provided by the project authorities in the DPR (approved by CEA or the State Government) shall form basis of
fixation of NAPAF.
(c)
Pondage type plants where plant availability is significantly affected by silt: 85%.
(d)
Run-of-river type plants: NAPAF to be determined plant-wise, based on l0-day design energy data, moderated
by past experience where available/relevant.
(e)
A further allowance may be made by the Commission in NAPAF determination under special circumstances,
e.g., abnormal silt problem or other operating conditions, and known plant Imitations.
The following Auxiliary Energy Consumption shall apply to other Hydro Stations
(a)
Surface hydro generating stations:
i.
With rotating exciters mounted on the generator shaft: 0.70%;
ii.
With static excitation system: 1.00%;
(b)
Underground hydro generating station:
i.
With rotating exciters mounted on the generator shaft: 0.90%;
ii.
With static excitation system: 1.20%.
34.4 Operation and Maintenance Expenses for Hydro Power Plant
(a)
The Operation and Maintenance expenses including insurance shall be derived on the basis of the average of
the actual Operation and Maintenance expenses for the three (3) years ending March 31,2018, subject to prudence
check by the Commission.
(b)
The average of such operation and maintenance expenses shall be considered as operation and maintenance
expenses for the financial year ended March 31,2020 and shall be escalated at the escalation factor of 4% to arrive at
operation and maintenance expenses for subsequent years of the control period. Alternatively, the Commission may
peg O&M expenses for the first year of operation at2% of the projectcost admitted by the Commission (excluding
cost of rehabilitation and resettlement works and any other cost that may be disallowed by the Commission including
on account of delay in CoD).
(2)
The O&M expenses for each subsequent year will be determined by escalating the base expenses determined
above, at the escalation factor of 4%.
Capacity Charge and Energy Charge for Hydro Power Plants:
The Annual Fixed Charges of a Hydro Generating Station shall be computed on annual basis, based on the norms
specified under these Regulations, and recovered on monthly basis under capacity charge (inclusive of incentive) and
Energy Charge, which shall be payable by the beneficiaries in proportion to their respective share in the capacity of
the generating station'
PART III]
HARYANA GOVT. GAZ., NOV. 12, 2019 (KRTK. 21, 1941 SAKA)
451
1.
The capacity charge (inclusive of incentive) payable to a hydro generating station for a calendar month shall
be as under:-
AFC x 0.5 x NDM /NDY x (PAFM/NAPAF) (in INR);
Where;
AFC = Annual fixed cost specified for the year, in Rupees;
NAPAF = Normative plant availability factor in percentage;
NDM = Number of days in the month;
NDY= Number of days in the year;
PAFM = Plant availability factor achieved during the month, in Percentage.
The PAFM shall be computed in accordance with the following formula:
PAFM = 10000x X ∑DCi / { N x IC x ( 100 - AUX ) } %
i= 1
AUX = Normative auxiliary energy consumption in percentage;
DCi= Declared capacity (in ex-bus MW) for the is day of the month which the stationcan deliver for at least
three (3) hours; as certified by the State Load Despatch Centre after the day is over.
IC = Installed capacity (in MW) of the complete generating station;
N = Number of days in the month.
2.
The Energy Charge shall be payable by every beneficiary for the total energy supplied to the beneficiary,
excluding free energy for home state (FEHS), if any, during the calendar month on ex-power plant basis, at the
computed Energy Charge rate.
Total Energy Charge payable to the Generating Company for a month shall be:
(Energy Charge Rate in Rs./kwh) x {Energy (ex-bus)} for the month in kWh x (100-FEHS)/100 .
3.
Energy Charge Rate (ECR) in Rupees per kWh on ex-power plant basis, for a Hydro Generating Station, shall
be determined up to three decimal places based on the following formula:
ECR =AFCx 0.5 x 10/ {DE x(100-AUX)x(100-FEHS)};
Where;
FEHS: Free energy for Home State.
DE = Annual Design Energy specified for the hydro generating station, in MWh, subject to the provision in
Regulation below.
4.
In case actual total energy generated by a Hydro Generating Station during a year is less than the Design
Energy for reasons beyond the control of the Generating Company, the following treatment shall be applied on
a rolling basis:
(i)
in case the energy shortfall occurs within ten years from the date of commercial operation of a
generating station, the ECR for the year following the year of energy shortfall shall be computed based on the
formula specified in these Regulations with the modification that the DE for the year shall be considered as
equal to the actual energy generated during the year of the shortfall, till the Energy Charge shortfall of the
previous year has been made up, after which normal ECR shall be applicable;
(ii)
in case the energy shortfall occurs after ten years from the date of commercial operation of a generating
station, the following shall apply:-
Suppose the specified annual Design Energy (DE) for the station is DE MWh, and the actual energy generated
during the relevant (first) and the following (second) financial years are Al and A2MWh, respectively, Al
being less than DE, then the Design Energy to be considered in the formula in these Regulations for
calculating the ECR for the third financial year shall be moderated as (A1 + A2 - DE) MWh, subject to a
maximum of DE MWh and a minimum of Al MWh;
HARYANA GOVT. GAZ., NOV. 12, 2019 (KRTK. 21, 1941 SAKA)
[ PART III
452
(iii)
Actual energy generated (e.g., Al, A2) shall be arrived at by multiplying the net metered energy sent
out from the station by 100 / (100 - AUX).
ln case the Energy Charge Rate (ECR) for a hydro generating station, as computed in Regulation above
exceeds ninety paise per kWh, and the actual saleable energy] in a year exceeds {DE x (100 - AUX) x (100-
FEHS)/ 10000) MWh, the Energy Charge for the energy in excess of the above shall be billed at ninety paise
per kWh only:
Provided that in a year following a year in which the total energy generated was less than the design
energy for reasons beyond the control of the Generating Company, the Energy- Charge Rate shall be reduced
to ninety paise per kWh after the energy charge shortfall of the previous year has been made up.
The State Load Dispatch Centre shall finalize the schedules for the hydro generating stations, in consultation
with the beneficiaries, for optimal utilization of all the energy declared to be available, which shall be
scheduled for all beneficiaries in proportion to their respective allocations in the generating station.
Capital Cost and Additional Capitalization
For the purpose of determination of tariff, the capital cost and additional capitalisation for Hydro Power Plants
shall be allowed/approved in accordance with the provisions outlined under Regulation 18.
35
UNSCHEDULED INTERCHANGE CHARGES
(a) As and when intra state ABT is implemented, all variations between actual net injection and scheduled
net injection for generating plant, and all variations between actual net drawl and schedule net drawl for
beneficiaries shall be treated as their respective unscheduled interchanges (UI) and will be dealt with as
per the intra-State ABT Regulations to be notified by the Commission.
(b)
The profit and loss on account of unscheduled interchange shall be to the account of the generating
company.
36
SCHEDULING
The methodology for scheduling and dispatch for the generating plant shall be as specified in the Haryana Grid
Code/IEGC and the intra state ABT Regulations to be notified by the Commission as amended from time to
time. Until the intra-State ABT Regulations are notified by the Commission CERC ABT Regulations would be
applicable.
37
SLDC AND TRANSMISSION CHARGES
(a)
SLDC and Transmission charges as determined by the Commission shall be considered as a part of
expenditure, as pass through, if payable by the generating company;
(b) SLDC and transmission charges paid for energy sold outside the state, if any, shall not be considered as
expenses for determining generation tariff.
38
REACTIVE ENERGY
A generating station shall inject/absorb the reactive energy into the grid as per the directions of State Load
Despatch Centre. Such injection/absorption may be undertaken on the basis of machine capability and in
accordance with the directions issued by SLDC as per the provisions of Haryana Grid Code as amended from
time to time.
39
DEMONSTRATION OF DECLARED CAPACITY
(i)
The generating company may be required to demonstrate the declared capacity of its generating plant as
and when asked by the State Load Dispatch Centre or as requested by DISCOMs to SLDC. In the event
of the generating company failing to demonstrate the declared capacity, the capacity charges due to the
generating plant shall be reduced as a measure of penalty as provided below;
The quantum of penalty for the first mis-declaration in a financial year for any duration or block in a
day shall be charged corresponding to two days of fixed charges. For the second mis-declaration the
penalty shall be equivalent to fixed charges for four days and for subsequent mis-declarations in the
financial year, the penalty shall be multiplied in the geometrical progression. Same process to be
followed in the subsequent financial years;
PART III]
HARYANA GOVT. GAZ., NOV. 12, 2019 (KRTK. 21, 1941 SAKA)
453
(ii)
The operating log books of the generating plant shall be available for review by the State Load
Dispatch Centre. These books shall contain record of machine operation and maintenance.
(iii)
The SLDC shall provide to the Commission any data/information in the context of demonstration of
declared capacity by a generating company or in the context of any other issue concerning system
operation/security as may be asked for by the Commission.
40
METERING AND ACCOUNTING
(i)
Metering arrangement, including installation, testing and operation and maintenance of meters and
collection, transportation and processing of data required for accounting of energy exchanges and
average frequency on 15 minutes time block basis shall be provided by the State Load Dispatch Centre
to the State Transmission Utility;
(ii)
Processed data of the meters along with data relating to declared capacities and schedules etc shall be
supplied by State Load Dispatch Centre to the State Transmission Utility;
(iii)
For all purpose, the Standards for Metering and Accounting specified in the Haryana Grid Code
Regulations 2009, intra-State ABT Regulations to be notified by the Commission and the Central
Electricity Authority (Installation and Operation of Meters) Regulations 2006 notified by the CEA,
shall be adopted and followed. Until the intra-State ABT Regulations are notified by the Commission,
CERC ABT Regulations would be applicable.
41
BILLING AND PAYMENT
(i)
Bills shall be raised for capacity charges, and energy charges on monthly basis by the generating
company in accordance with these Regulations, and applicable payments shall be made by the
beneficiaries directly to the generating company.
(ii)
Payment of the capacity charges for a thermal generating plant shall be shared by the beneficiaries of
the generating plant as per their percentage allocated share for the month (inclusive of any allocation
out of the unallocated capacity) in the installed capacity of the generating plant.
42
REBATE FOR EARLY PAYMENT
In case of early payment of bills of capacity and energy charges the following schedule of rebate shall be
followed:
Days from the date of receipt of bills of capacity charges, energy
charges etc.
Rebate %
0-7
2.0
8-14
1.0
15-21
0.5
22-30
0.25
43
LATE PAYMENT SURCHARGE
In case the payment of any bill for charges payable under these Regulations is delayed by the beneficiary
beyond a period of 30 days from the date of receipt of bill, a late payment surcharge at the rate of 0.04% per
day shall be levied by the generating company and shall be payable by the beneficiaries.
44 SALE OF INFIRM POWER
(a)
Supply of infirm power shall be accounted as Unscheduled Interchange (UI) and paid for from the
regional or State UI pool account at the applicable frequency-linked UI rate.
(b)
Any revenue earned by the generating company from sale of infirm power after accounting for the fuel
expenses shall be applied for reduction in capital cost. Any loss on this account shall not be taken into
consideration.
HARYANA GOVT. GAZ., NOV. 12, 2019 (KRTK. 21, 1941 SAKA)
[ PART III
454
45
NON-TARIFF INCOME
(a)
All incomes being incidental to electricity business and derived by the generating company from
sources, including but not limited to profit derived from disposal of assets, rents, miscellaneous receipts from
the beneficiaries, etc. shall constitute non-tariff Income of the generating company;
(b)
The amount received by the generating companyon account of non-tariff income shall be deducted from
the aggregate revenue requirement for calculating the net revenue requirement of such licensee:
Provided that the generating companyshall submit full details of his forecast of non-tariff income to the
Commission in such form as may be stipulated by the Commission from time to time;
Provided that Late Payment Surcharge and Interest on Late Payment earned by the Generating
Company shall not be considered under Non-tariff Income;
(c)
The “non-tariff income” shall include but shall not be limited to the following:
i.
Income from rent on land or buildings or other assets;
ii.
Income from sale of land or other assets;
iii.
Income from sale of scrap;
iv.
Income from statutory investments;
v.
Income from sale of Ash/rejected coal;
vi.
Interest on advances to suppliers/contractors;
vii.
Rental from staff quarters;
viii.
Rental from contractors;
ix.
Income from hire charges from contactors and others;
x.
Deferred Income from grant, subsidy, etc., as per Annual Accounts;
xi.
Income from advertisements;
xii.
Excess found on physical verification;
xiii.
Interest on investments, fixed and call deposits and bank balances;
xiv.
Prior period income, etc.:
PART III]
HARYANA GOVT. GAZ., NOV. 12, 2019 (KRTK. 21, 1941 SAKA)
455
PART VI - PRINCIPLES FOR DETERMINATION OF TARIFF AND NORMS OF OPERATION FOR
TRANSMISSION BUSINESS
45.
NORMS OF OPERATION FOR TRANSMISSION LICENSEE
The norms of operation for transmission licensee shall be as under:
45.1 Normative annual transmission system availability Factor (NATAF)
Norm
MYT Period
AC System
99.2 (%)
The above-mentioned target availability will be subject to an incentive and penalty mechanism
once the conditions specified in Regulation 12 are satisfied.
Provided also that for AC system, two trippings per year shall be allowed, and after two
trippings in a year, additional 12 hours outage shall be considered in addition to the actual outage:
Provided also that in case of outage of a transmission element affecting evacuation of power
from a generating station, outage hour shall be multiplied by a factor of 2.
45.2 Auxiliary energy consumption in the substations
The charges for auxiliary energy consumption in the AC sub-station for the purpose of air-conditioning,
lighting and consumption in other equipment shall be borne by the transmission licensee and will be
included as part of the administrative and general expenses.
45.3 Operation and maintenance expenses
The actual audited Employee cost (excluding terminal liabilities) and A&G expenses for the financial
year preceding the base year, subject to prudence check, shall be escalated at the escalation factor of
4% to arrive at the Employee cost (excluding terminal liabilities) and A&G expenses for the base year
of the control period. The O&M expenses for the nth year of the control period shall be approved based
on the formula given below:
O&Mn = (R&Mn + EMPn + A&Gn)* (1-Xn) + Terminal Liabilities
Where,
R&Mn – Repair and maintenance costs of the transmission licensee for the nth year;
EMPn – Employee costs of the transmission licensee for the nth year excluding terminal
liabilities;
A&Gn – Administrative and general costs of the transmission licensee for the nth year;
The above components shall be computed in the manner specified below:
(a)
R&Mn= K*GFA*(INDXn/ INDXn-1)
Where,
‘K’ is a constant (expressed in %) governing the relationship between R&M costs and
Gross Fixed Assets (GFA) for the nth year. The value of K will be 0.50% for the entire
control period;
GFA is the average value of gross fixed assets for the nth year;
INDXnmeans the inflation factor for the nth year as defined herein after:
(b)
EMPn (excluding terminal liabilities) +A&Gn= (EMPn-1+A&Gn-1) *(INDXn/ INDXn-1)
Where,
INDXn – Inflation Factor to be used for indexing the employee cost and A&G cost. This
will be a combination of the consumer price index (CPI) and the wholesale price index
(WPI) for immediately preceding year and shall be calculated as under:
INDXn= 0.55*CPIn +0.45*WPIn
Note: As and when any material price index specific to power sector or a more relevant Index
becomes available, the same shall replace the Index used for working out R&M cost.
Note: Source for CPI and WPI calculation as under:
Wholesale Price Index numbers as per Office of Economic Advisor of Government of India in
the previous year;
Consumer Price Index for Industrial Workers (all India) as per Labour Bureau, Government of
India in the previous year
HARYANA GOVT. GAZ., NOV. 12, 2019 (KRTK. 21, 1941 SAKA)
[ PART III
456
(c)
Xn is an efficiency factor for nth year
Xn will be calculated by the Commission by analysing the change in the total operating
expenditure i.e. expenditure before depreciation, interest and taxes (i) Per unit of circuit km over
last three years; and (ii) Per unit of transformation capacity over last three years.
The Value of Xn will be determined by the Commission in the MYT order for the control period.
The transmission licensee will be required to submit the above data based on the actual for the
last three years.
Note 1: For the purpose of estimation, the same INDXn value shall be used for all years of the
control period. However, the Commission will consider the actual values in the INDXn at the
end of each year during the mid-year performance review and true-up exercise and true-up the
employee cost and A&G expenses on account of this variation.
Note 2: Any variation in employee cost and A&G cost on account of reasons beyond variation
in INDXn will be subject to the incentive and penalty framework specified in these Regulations.
Note 3: Terminal liabilities will be approved as per actual expenditure incurred by the
transmission licensee or as established through actuarial valuation.
Note 4:O&M expenses made on account of extraordinary situations, if any, shall be submitted to
Commission for its approval. Such expenses shall be filed separately and will not be subjected to
incentive and penalty framework. The approved amount by the Commission shall be trued up in
the mid-year performance review and true-up.
Note 5: Changes in the pay scales of employees necessitated on account of pay revision by Pay
Commission or by the State Government orders shall be considered by the Commission for true-
up during the mid-year performance review and true-up.
45.4
Transmission losses (%)
The trajectory for, intra-state transmission loss, during the control period shall be as under:
FY 2020-21
FY 2021-22
FY 2022-23
FY 2023-24
FY 2024-25
2.15
2.10
2.05
2.02
2.0
(a)
The losses shall be borne by the beneficiaries in kind. The SLDC shall reduce the demand
scheduled by the beneficiaries during each time block by the 12 months rolling transmission
losses (the said period will be the 12 months period proceeding the relevant month by 3 months).
The SLDC shall post the rolling 12 months losses regularly on its website. The SLDC, however,
shall develop necessary software for working out rolling 52-week losses and reduce the
scheduled demand accordingly thereafter.
(b)
If the actual annual transmission losses (%) exceed the benchmark value (%) approved by the
Commission, the licensee(s) shall be penalized in the following manner:
Percentage increase above the Loss
level specified by the Commission
Penalty
Upto 5%
No Penalty
More than 5% and upto 10%
Reduction in return on equity in Rs crore by 0.5 %
More than 10% and upto 15%
Reduction in return on equity in Rs crore by 1 %
More than 15%
Reduction in return on equity in Rs Crore by 1% + 0.5%
for every increase of 5% or part thereof above 15%
Example: In case the specified transmission loss level is 3%, then an increase of 0.15 in the loss level
will amount to 5% increase. Similarly, an increase of 0.30 and 0.45 in the loss level will amount to 10%
and 15% increase in the loss level respectively.
Provided, further that the intra-State transmission loss, in excess of the benchmark specified in
these Regulations shall not be passed on to the beneficiaries / electricity consumers.
PART III]
HARYANA GOVT. GAZ., NOV. 12, 2019 (KRTK. 21, 1941 SAKA)
457
46
NON-TARIFF INCOME
(a)
All incomes being incidental to electricity business and derived by the licensee from sources, including
but not limited to profit derived from disposal of assets, rents, miscellaneous receipts from the beneficiaries,
etc. shall constitute non-tariff Income of the licensee;
(b)
The amount received by the licensee on account of non-tariff income shall be deducted from the
aggregate revenue requirement for calculating the net revenue requirement of such licensee:
Provided that the transmission licensee shall submit full details of his forecast of non-tariff income to
the Commission in such form as may be stipulated by the Commission from time to time;
Provided that Late Payment Surcharge and Interest on Late Payment earned by the the Licensee shall
not be considered under Non-tariff Income;
(c)
The “non-tariff income” shall include but shall not be limited to the following:
i.
Income from rent on land or buildings or other assets;
ii.
Income from sale of land or other assets;
iii.
Income from sale of scrap;
iv.
Income from statutory investments;
v.
Income from interest on contingency reserve investment;
vi.
Interest on advances to suppliers/contractors;
vii.
Rental from staff quarters;
viii.
Rental from contractors;
ix.
Income from hire charges from contactors and others;
x.
Income from advertisements, etc.;
xi.
Miscellaneous receipts like parallel operation charges;
xii.
Deferred Income from grant, subsidy, etc., as per Annual Accounts;
xiii.
Excess found on physical verification;
xiv.
Interest on investments, fixed and call deposits and bank balances;
xv.
Prior period income, etc.
47 INCOME FROM SHORT TERM OPEN ACCESS CONSUMERS
(a)
The charges payable by the short-term open access consumers shall be as specified in the intra-State
open access Regulations notified by the Commission and as amended from time to time;
‘(b)
Intra State Transmission Charges and SLDC charges applicable to short term open access consumers
shall not be applicable on short term power purchase/sale by the long-term and medium-term beneficiaries of
the transmission licensee;
(c)
25% of the charges collected from the short-term open access consumers on account of application
money and transmission charges shall be retained by the transmission licensee and the balance 75% shall be
considered as non-tariff income and adjusted towards reduction in the transmission charges payable by the
long term and medium-term users.
48
REACTIVE ENERGY CHARGES
(a)
The reactive energy charges shall be as provided in the Haryana Grid Code as amended from time to
time.
HARYANA GOVT. GAZ., NOV. 12, 2019 (KRTK. 21, 1941 SAKA)
[ PART III
458
(b)
Reactive energy charge shall be payable and shared as per Regulation 5.5.1 of Haryana Grid Code
(HGC) Regulation, 2009 as amended from time to time;
(c)
Reactive energy account shall be maintained and operated as per the intra-State ABT Regulations to be
notified by the Commission and as amended from time to time. Until the intra-State ABT Regulations
are notified by the Commission, CERC ABT Regulations shall be applicable;
(d)
The reactive energy charges from embedded open access consumers shall be recovered by the
distribution licensee by apportioning the total reactive energy drawn during the month in the ratio of
energy drawn through open access and the energy drawn from the distribution licensee. The reactive
energy charges shall be recovered for the apportioned reactive energy corresponding to energy drawn
through open access at the applicable rate.
49
ANNUAL TRANSMISSION CHARGES
(a)
The total annual transmission charges of a transmission licensee shall be equal to total annual expenses
and return on equity as allowed as per these Regulations less non-tariff income and 50% of the revenue
generated from other business in line with HERC Regulations, 2007 for other income as amended from
time to time;
(b)
The transmission licensee shall be entitled to recover its annual transmission charges (ATC) from the
beneficiaries.
50
RECOVERY OF ANNUAL TRANSMISSION CHARGES
(a)
Transmission licensee shall recover the transmission charges at the normative annual transmission
system availability factor specified for it by the Commission.
(b)
Payment of transmission charges
Annual transmission charges shall be fully recoverable at the specified level of target availability.
Payment of transmission charges below the specified target availability shall be on pro-rata basis. The
transmission licensee may recover its annual transmission charges by way of a fixed charge based on
transformation capacity. The transmission charges shall be calculated on a monthly basis. In case of
more than one beneficiaries of the transmission system, including the distribution licensees and long
term and medium term open access consumers (but subject to any exclusion of any other open access
consumers as per the open access Regulation notified by the Commission), the monthly transmission
charges leviable on each beneficiary shall be computed as per the following formula.
ATC CA
Monthly Transmission Charges =
--------- x --------
12
CS
Where,
ATC = Annual Transmission Charges payable by all the beneficiaries after deducting any benefits to
be considered as decided by the Commission;
CA = Transformation Capacity (MVA) allocated to each beneficiary.
CS = Sum of Transformation Capacity (MVA)allocated to all beneficiaries.
Note: Where allocated Transformation Capacity (MVA) of a beneficiary is not available, the contracted
capacity in MW shall be converted in MVA at a power factor of 0.90 andthe same shall be considered
for computation of monthly transmission charges payable by the beneficiaries.
Provided that monthly Transmission tariff shall also be shared by a Generation Company
(including Renewable Energy Generators which opt for third party sale) if power from such Generating
Company is sold to a consumer outside the State of Haryana to the extent of capacity contracted outside
the state.
Provided further that the Long Term and Medium-Term beneficiaries of the Transmission
System shall pay no other charges for the use of Transmission Network of STU.
Provided also that the transmission charges shall be payable by the short-term open access
consumers for the scheduled energy drawl at per kWh rate as worked out by dividing the annual
transmission charges by the total volume of energy transmitted by the transmission licensee during the
previous year. Provided further that Intra-State charges payable by the Open Access Consumers shall
not be applicable on short term Open Access power purchase / sales by the Distribution Licensee.
PART III]
HARYANA GOVT. GAZ., NOV. 12, 2019 (KRTK. 21, 1941 SAKA)
459
51.
SHARING OF CHARGES FOR INTRA-STATE TRANSMISSION NETWORK IN CASE OF
MULTIPLE TRANSMISSION LICENSEES
51.1 Determination of Monthly Transmission Tariff (MTT)
51.1.1The aggregate of the yearly revenue requirement for all Transmission Licensees, less the
deductions, as approved by the Commission for a financial year, shall form the “Total
Transmission Cost” (TTC) of the Intra State transmission system, to be recovered from the
Long-term and Medium term Transmission System Users (TSUs) for that financial year, in
accordance with the following formula:
n
TTC= ∑ (ARRi- NTi- Oi) – STR
i=1
Where,
TTC = Total Transmission Cost for the financial year
n = Number of Transmission Licensee(s)
ARRi= Aggregate Revenue Requirement approved by the Commission for ith Transmission Licensee
for the financial year
NTi= Approved level of non-tariff income for ith Transmission Licensee for the financial year
Oi = Approved level of income from other business of the ith Transmission Licensee for the financial
year
STR = Revenue from short-term open access charges recovered and not allowed to be retained during
previous financial year.
Provided that the revenue from short-term open access charges for each year of Control
Period shall be taken to be same as that prevalent during the base year. However, the
adjustments due to variation in actual revenue from short-term open access charges shall be
undertaken during annual truing up:
Provided further that ARR of the Transmission Licensee, in case of transmission projects
selected through competitive bidding, shall be the Transmission Service Charge (TSC) for
relevant year as per the Transmission Service Agreement (TSA) approved and adopted by the
Commission in accordance with Section 63 of the Act.
51.1.2 The Total Transmission Cost (TTC) as determined by the Commission as per Regulation 51.1.1
above, shall be shared by all long-term and medium-term open access consumers on monthly
basis (including existing Distribution Licensees) in the same manner as provided for in
Regulation 50 for sharing of annual transmission charges.
52
RECOVERY OF CHARGES BY SLDC FROM BENEFICIARIES
“The annual charges of SLDC determined as per Regulations 6 and 16, shall be recovered as a single composite
charge from the beneficiaries as under:
(1) Intra-State transmission licensee
8% of Annual SLDC Charges
(2) Generating stations and sellers
46% of Annual SLDC Charges
(3) Distribution licensee and buyers
46% of Annual SLDC Charges
(i) The SLDC charges shall be levied by the Transmission licensees / STU, also designated as the SLDC, on the basis
of weighted average of the lines (Ckt. km) owned by the Intra State Transmission Licensee(s) as on the last day of the
month prior to billing of the month.
Ckt. Km 400 kV MF 4 product
Ckt. Km 220 kV MF 2.2 product
Ckt. Km 132kV MF 1.32 product
Ckt. Km 66 kV MF 0.66 product
_________
Total __XXX___
HARYANA GOVT. GAZ., NOV. 12, 2019 (KRTK. 21, 1941 SAKA)
[ PART III
460
Therefore, the SLDC charges for transmission licensee
= 8% x (annual SLDC charges X weighted Ckt Km of concerned transmission licensee) / total weightedCkt. Km of
all transmission licensees.
(ii)
The SLDC charges from the generating companies and sellers (which Exclude short term open access
consumers) shall be collected in proportion to their installed capacity /contracted capacity as on the last day of the
month prior to billing of the month.
(iii)
The SLDC charges from distribution licensees and buyers (which exclude short term open access consumers)
shall be collected in proportion to the sum of their allocated transmission capacity in MVA as on the last day of the
month prior to billing of the month.
(iv)
SLDC charges shall be collected on monthly basis.
(v)
Any deviation in the value of annual SLDC charges determined and collected from the beneficiaries shall be
trued up during the mid-year performance review and true-up.
(vi)
For the purpose of recovery of SLDC charges from the entity which has entered into a long term open access /
Medium Term open access agreement with STU, shall be considered under the category in wunhich it has
applied/signed the Long Term/Medium Term Open Access agreement i.e. generator/supplier or distribution
licensee/buyer”.
53 RECOVERY OF SLDC CHARGES FROM SHORT TERM OPEN ACCESS CONSUMERS
The short-term open access consumers shall pay composite SLDC charges as provided in HERC (Terms and
conditions for grant of connectivity and open access for intra–State transmission and distribution system),
Regulations, 2012 as amended from time to time. The total receipt of SLDC charges from short term open access
consumers shall be utilised to reduce the SLDC charges payable by the beneficiaries.
54.
BILLING AND PAYMENT OF CHARGES
54.1
The State Transmission Utility shall raise bills for SLDC and transmission charges payable by the
beneficiaries on a monthly basis. The STU shall raise bills for UI charges on weekly basis as and when
intra state ABT is implemented. UI accounting procedures shall be governed by intra-state ABT
Regulations to be notified by the Commission as amended from time to time.
54.2
Rebate for early payment
In case of early payment of bills of transmission and other charges the rebate as under shall be
admissible:
Days from the date of receipt of bills of transmission charges
Rebate (%)
0-7
2
8-14
1
15-21
0.5
22-30
0.25
54.3 Late payment surcharge
In case the payment of bills of transmission and other charges by the beneficiary is delayed beyond a
period of 30 days from the date of receipt of bill, a late payment surcharge of 0.04% per day shall be
payable by the beneficiary.
55. Quality of Supply
The Commission shall monitor the following Quality of Transmission parameters during the Control Period.
(a)
Transmission System Availability
(b)
Transformer Failure across various capacities which represents the number of transformer failures as a
percentage of the total number of transformers in that specified capacity within the Transmission System over
a specified period of time.
(c)
System Reliability
The Transmission Licensee in its Business Plan filings shall submit and propose the trajectory for the
achievement of quality targets including reduction in the frequency of interruptions. The Commission shall
specify the targets for each parameter. The Transmission Licensee shall submit its performance on each
parameter in the form and manner specified by the Commission. In the case of frequency of interruptions
being high the same will have bearing on the level of incentive allowed for availability.
PART III]
HARYANA GOVT. GAZ., NOV. 12, 2019 (KRTK. 21, 1941 SAKA)
461
The Transmission Licensee shall achieve redundancy in their system and move towards N-1 criteria for their
system planning. Also, Transmission Licensee shall focus in setting up 220/33 kV S/s for ultimate usage of the
end consumer and shall avoid setting up new 132kV S/s or such voltage levels S/s whose consumers are not in
place.
56.
Safety Standards
The Transmission Licensee shall develop a Safety Manual and follow procedure to maintain the safety
standards during construction, operation, etc. in line with the provisions of CEA (Measures relating to Safety
and Electric Supply) Regulations, 2010 as amended from time to time.
HARYANA GOVT. GAZ., NOV. 12, 2019 (KRTK. 21, 1941 SAKA)
[ PART III
462
PART VII - PRINCIPLES FOR DETERMINATION OF TARIFF AND NORMS OF OPERATION FOR
DISTRIBUTION BUSINESS
57. NORMS OF OPERATION FOR DISTRIBUTION LICENSEE
The norms of operation for distribution licensee shall be as under:
57.1 Distribution loss
(a)
The distribution loss shall be equal to the difference between the energy injected into the
distribution system (X) and the sum of energy sold to all its consumers (Y);
(b)
Energy sold shall be the sum of metered sales and assessed unmetered sales, if any, based on
approved methodology/ norms. The percentage distribution loss shall be as follows:
Percentage distribution loss = ((X- Y)/X) x100
(c)
The distribution licensee shall file the loss trajectory in the business plan commensurate with the
capital investment plan. The Commission after verification and evaluation of the same shall
approve the loss trajectory for each year of the control period;
(d)
The distribution loss level will be linked to a normative load factor for unmetered agriculture
consumers. The distribution licensee shall establish consumption of unmetered agriculture
consumers through a representative and reliable energy audit/sample tube well metering/sample
DT metering/ meter readings of the 11 kV segregated AP feeders and submit requisite data for
consideration of the Commission.
Provided that the Distribution loss trajectory for the control period shall be decided by
the Commission in the MYT Order, considering the past performance data, estimate of
distribution losses for each year of the control period submitted by the Distribution Licensees in
their MYT Petition, industry bench marks/norms and after consideration of other relevant
factors considered appropriate by the Commission. The distribution licensee shall submit
appropriate feeder wise losses data along with its plans to bring the same within the industry
benchmark and accordingly calculate and submit the loss reduction trajectory along with the
MYT petition for the first year of the second control period.
(e)
In the absence of requisite data in respect of such energy audit / sample surveys / sample DT
metering/ meter readings of segregated 11kV AP feeders, the Commission shall not accept the
claim of the distribution licensee and may proceed to fix the loss levels and the load factor for
unmetered agriculture consumption on the basis of the information available with it; The
distribution licensee shall furnish within a period of six months from the date of notification of
these Regulations, computation of supply voltage - wise and consumer category wise
distribution and AT&C losses;
(f)
Any overachievement and underachievement of the loss trajectory shall be subject to incentive
and penalty framework specified in Regulation 12. The distribution licensee(s) shall provide a
statement to this effect in the mid-year performance review and true-up.
Provided that the financial impact on account of over or under achievement of
Distribution Loss target shall be computed as under:
where,
Q1 = Actual quantum of Energy purchased at Distribution periphery in MU;
L1 = Distribution Loss Target in %;
P = Trued up Average Power Purchase Cost (APPC) per unit at Distribution periphery in
Rs./kWh;
Q2 = Actual quantum of Energy Billed in MU.
PART III]
HARYANA GOVT. GAZ., NOV. 12, 2019 (KRTK. 21, 1941 SAKA)
463
57.2
Collection Efficiency
The norms for Collection Efficiency for the distribution licensee(s) shall be 99.50% for every year of
this Control Period.
Besides the Collection Efficiency, the Commission shall also monitor the recovery of arrears of
previous years for which the Commission shall prescribe the targets and shall accordingly assess the
performance of the licensee with regard to recovery of arrears.
Any over achievement or under achievement in respect of Collection Efficiency and recovery of arrears
shall be subject to incentive and penalty framework as specified in Regulation 12.
57.3
AT&C Losses
The Distribution Licensee shall file AT&C Loss trajectory for monitoring AT&C Losses.
The percentage AT&C losses shall be calculated as per the following formula:
% AT&C losses=100-CEx(1-DL/100)
Where:
CE is the % Collection Efficiency and
DL is the % Distribution Loss
57.4
Operation and Maintenance Expenses
The actual audited expenses for the financial year preceding the base year, subject to prudence check,
shall be escalated at the escalation factor of 4% to arrive at the Employee Costs and Administrative and
General Costs for the base year of the control period. The O&M expenses for the nth year of the control
period shall be approved based on the formula given below.
O&Mn = (R&Mn + EMPn + A&Gn)* (1-Xn) + Terminal Liabilities
Where,
R&Mn – Repair and Maintenance Costs of the Distribution Licensee(s) for the nth year;
EMPn – Employee Costs of the Distribution Licensee(s) for the nth year excluding
terminal liabilities;
A&Gn – Administrative and General Costs of the Distribution Licensee(s) for the nth
year;
The above components shall be computed in the following manner.
(a)
R&Mn= K * GFA *INDXn/ INDXn-1
Where,
‘K’ is a constant (expressed in %) governing the relationship between O&M costs
and Gross Fixed Assets (GFA) for the nth year. The value of K will be 1.65% for
DHBVN and UHBVN respectively for the entire control period;
‘GFA’is the average value of the gross fixed asset of the nth year.
‘INDXn
’means the inflation factor for the nth year as defined hereinafter.
(b)
EMPn(excluding terminal liabilities) + A&Gn= (EMPn-1 + A&Gn1)*(INDXn/ INDXn-1)
Where,
INDXn – Inflation Factor to be used for indexing the Employee Cost and A&G
cost. This will be a combination of the Consumer Price Index (CPI) and the
Wholesale Price Index (WPI) for immediately preceding year and shall be
calculated as under:
INDXn= 0.55*CPIn +0.45*WPIn.
HARYANA GOVT. GAZ., NOV. 12, 2019 (KRTK. 21, 1941 SAKA)
[ PART III
464
Note 1: For the purpose of estimation, the same INDXn value shall be used for all years
of the control period. However, the Commission shall consider the actual values of the
INDXn at the end of each year during the annual performance review exercise and true-up
the employee cost and A&G expenses on account of this variation.
Note 2: Any variation in employee cost and A&G cost on account of reasons beyond
variation in INDXn shall be subject to the incentive and penalty framework specified in
Regulation 12.
Note 3: As and when any material price index specific to power sector or a more relevant
Index becomes available, the same shall replace the Index used for working out R&M
cost.
Note 4: Terminal liabilities shall be approved as per actual expenditure incurred by the
distribution licensee or established through actuarial valuation for the ensuing year.
Note 5:O&M expenses made on account of extraordinary situations (if any) shall be
submitted to Commission for its approval. Such expenses shall be filed separately and
will not be subjected to incentive and penalty framework. The approved amount by the
Commission shall be trued up in the annual performance review.
Note 6: Changes in the pay scales of employees necessitated on account of pay revision
by Pay Commission or by the State Government orders shall be considered by the
Commission for true-up during the annual performance review.
Note 7: Source for CPI and WPI calculation as under:
Wholesale Price Index numbers as per Office of Economic Advisor of Government of
India in the previous year;
Consumer Price Index for Industrial Workers (all India) as per Labour Bureau,
Government of India in the previous year
(c)
Xn is an efficiency factor for nth year
The Value of Xn will be determined by the Commission in the MYT order for the control
period.
58
SALES AND POWER PURCHASE VOLUME
58.1
The distribution licensee shall forecast monthly sales for each customer category and sub-categories for
all years of the control period in their business plan and ARR filings, for review and approval by the
Commission.
58.2
So long as there are any un-metered agriculture consumers, the sales forecast for unmetered agriculture
consumer shall be validated with norms approved by the Commission on the basis of a proper study
carried out by the distribution licensee.
Note: These norms can be revised by the Commission based on actual data or better estimates made
available by the distribution licensee.
58.3
The Commission shall examine the forecasts for their reasonableness based on growth in the number of
consumers, pattern of consumption, losses and demand of electricity in previous years and anticipated
growth in the subsequent years and any other factor, which the Commission may consider relevant and
approve the sales forecast with such modifications as deemed fit;
58.4
Sale of electricity, if any, to electricity traders or other distribution licensee or outside state sales
through banking etc. shall be separately indicated;
58.5
The distribution licensee shall also indicate consumer category-wise open access consumers. The
demand and energy wheeled for them shall be shown separately for:
(i)
Supply within its area of supply; and
(ii)
Supply outside its area of supply;
58.6
Based on the above, the distribution licensee shall project month- wise and source-wise power purchase
requirement for each year of the control period.
58.7
The Commission shall scrutinize and approve the requirement for purchase of power with such
modifications as deemed fit, for each year of the control period;
58.8
Any power purchased by the distribution licensee over and above the requirement of power approved
by the Commission or variation in the mix of power purchased in any year shall be considered by the
Commission if it is for reasons beyond the control of the distribution licensee(s). The Commission
PART III]
HARYANA GOVT. GAZ., NOV. 12, 2019 (KRTK. 21, 1941 SAKA)
465
shall, however, estimate the revenue from such sales and allowable quantum of power purchase based
on target losses as per the FSA mechanism approved by the Commission. The resultant cost and
revenue shall be adjusted during true-up exercise for the said financial year in the next year’s tariff;
58.9
Any financial gain or loss on account of power purchased by the licensee in any year over and above
the approved level and not covered in the above sub Regulations shall be borne by the licensee.
59.
COST OF POWER PURCHASE
59.1 The distribution licensee shall be allowed to recover the cost of power it procures from all approved
sources including the power procured from the State-owned generating stations, independent power
producers, Central generating stations, renewable energy sources and others, for supply of power to
consumers, based on the sales forecast and losses for the distribution licensee approved by the
Commission for each year of the control period;
59.2
Approved retail sales level shall be grossed up by normative level of T&D losses as specified by the
Commission in the approved loss trajectory for the purpose of arriving at the quantity of power to be
purchased;
59.3
While approving the cost of power purchase, the Commission shall determine the quantum of power to
be purchased from various sources in accordance with the principles of merit order schedule and
despatch based on a ranking of all approved sources of supply in the order of their variable cost of
power. All power purchase costs will be considered legitimate unless the Commission concludes that
the merit order principle has been violated or power has been purchased at unreasonable rates except
for marginal purchases of transient nature beyond the control of the licensee subject, however, to
Regulation 59.2;
59.4
The cost of power purchased by the distribution licensees from generating stations of HPGCL shall be
worked out based on the tariff determined by the Commission. The cost of power purchase from central
generating stations shall be worked out based on the tariff determined by the CERC. Similarly, the cost
of power purchased from nuclear power stations of Nuclear Power Corporation of India Ltd. (NPCIL)
shall be worked out on the basis of tariff notified by the Departmental of Atomic Energy under the
Atomic Energy Act, 1961. In case of bilateral transactions, the rates as per PPAs approved by the
Commission shall be considered. The cost of power purchase from other generating companies /
sources shall be worked out based on invoices raised by the generators during the previous year. In
absence of above, rates based on bills of energy purchased during the previous 3 months shall be
considered by the Commission.
59.5
The cost of power purchase from non-conventional energy sources shall be based on the tariff
determined by the Commission as per renewable energy Regulations notified by the Commission and as
amended from time to time or as per the PPAs approved by the Commission.
59.6
Subject to provisions of clause 59.3, any variation in cost of power purchase at the allowed transmission
loss level, for reasons beyond the control of the distribution licensee, shall be allowed to be recovered by
the distribution licensee by way of FSA, as per the formula approved by the Commission and as
amended from time to time. The procurement price to be adopted for working out variation in the cost of
power beyond approved power purchase volume shall be the generation tariff approved by the
Commission, the rate discovered through competitive bidding and adopted by the Commission or the
short-term rates approved by the Commission.
59.7
Any loss on account of increase in power purchase cost, not covered above, shall be borne by the
distribution licensee subject to regulations 12 regarding sharing of gains and losses.
59.8
The Renewable Purchase Obligation (RPO) of the distribution licensee shall be as per the renewable
energy Regulations notified by the Commission as amended from time to time.
60.
SHORT-TERM POWER PROCUREMENT
60.1
The distribution licensee shall submit a rolling quarterly forecast of the quantum of short-term power to
be purchased for the year for the Commission’s approval. The forecast shall be based on monthly sales
forecast, the power available from approved long-term sources of power, merit order dispatch of
available sources, banking with other distribution utilities, load curtailment, time of its requirement,
availability of short-term power and the expected price. The distribution licensee shall provide the basis
for forecast of short-term power procurement price including the criteria for evaluation of alternative
options;
60.2
The Commission shall indicate the ceiling of short-term power purchase price and volume for the
ensuing quarter based on the availability of power, past requirement, approved quantum of short-term
HARYANA GOVT. GAZ., NOV. 12, 2019 (KRTK. 21, 1941 SAKA)
[ PART III
466
power in ARR, approval granted for past quarter and past market performance. The Commission may
ask for additional information and data as it may deem necessary for reviewing the forecast for the
ensuing quarter and the distribution licensee shall furnish such information within 2 weeks from being
asked to do so;
60.3
If there is a short term requirement of power by the distribution licensee over and above the quantum as
approved by the Commission and such requirement is on account of any factor beyond the control of
the distribution licensee (shortage/non-availability of fuel, snow capping of hydro resources inhibiting
power generation in sources stipulated in the plan, unplanned/forced outages of power generating units
or acts of God), then the cost shall be directly passed on to the consumers through FSA mechanism.
Provided that the cost of the additional power shall be allowed at the ceiling price for short term
power determined by the Commission in accordance with Regulation 60.2.
Provided further that in such a case, the distribution licensee shall inform the Commission about
the purchase of power over and above approved quantum with all of the supporting documents. Unless
the Commission is satisfied that the additional power is within the ceiling price of short-term power
determined by the Commission, it may disallow the quantum and cost of this short-term power
procurement in the True-Up order.
60.4
The variation in actual quantum and price of short-term power vis-a-vis the quantum and price of short-
term power approved by the Commission shall be subjected to prudence check by the Commission and
shall be adjusted on yearly basis along with the annual performance review based on the price and
quantum cap determined by the Commission for each quarter as mentioned in the above Regulation.
61.
TRANSMISSION AND SLDC CHARGES
61.1
The Inter-State transmission charges shall be estimated as per the order of the Central Electricity
Regulatory Commission;
61.2
The transmission charges, wheeling charges and other charges payable by the distribution licensee for
intra State transmission or wheeling of power purchased by it shall be considered as per tariff
determined by the Commission;
61.3 The reactive energy charges payable by the distribution licensee to the transmission licensee shall be
payable as per Regulation 5.5.1 of the Haryana Grid Code (HGC) as amended from time to time.
The reactive energy charges paid by the distribution licensee however shall not be recovered through
ARR. The capital investment plan to be prepared by the distribution licensee shall include capital
investment towards meeting the reactive energy requirement.
61.4 SLDC charges if paid separately in addition to charges for usage of transmission network shall be
considered as allowable expenses for the purpose of determination of tariff.
62.
WHEELING CHARGES
62.1 The consumers availing wheeling services for ‘open access’, will be charged a wheeling tariff as
determined under these Regulations;
The wheeling charge payable to the distribution licensee by long-term &medium-term open access
consumers shall be in Rs. / MW and shall be computed by dividing the approved ARR of the licensee
for wheeling business by peak load demand in MW served by the licensee in the preceding year.
Provided that wheeling charges shall be payable by the long-term and medium-term open
access consumers on the basis of contracted capacity in MW and by short-term open access consumers
on the basis of scheduled energy transactions cleared by the relevant Load Despatch Centre.
Provided further that wheeling charges (Rs. /kWh) payable by the short-term open access
consumers during a financial year shall be worked out by dividing the approved ARR (in Rs.) for
wheeling business for that year by the gross volume of energy wheeled (kWh) during the relevant year
as approved by the Commission.
Provided further that the Distribution Licensee shall be allowed to recover the approved level
of wheeling losses arising from the operation of the distribution system, as stipulated in the respective
Tariff Order from the short term open access consumers in addition to the wheeling charges as
determined above.
62.2 Income from wheeling from open access consumers:
25% of the wheeling charges collected from open access consumers shall be retained by the distribution
licensees and the balance 75% shall be adjusted towards reduction of ARR for the retail supply
business.
PART III]
HARYANA GOVT. GAZ., NOV. 12, 2019 (KRTK. 21, 1941 SAKA)
467
Provided that Wheeling Losses: The Distribution Licensee shall be allowed to recoverthe
approved level of wheeling losses arising from the operation of the distribution system, as stipulated in
the respective Tariff Order.
63. CROSS-SUBSIDY SURCHARGE / ADDITIONAL SURCHARGE
63.1
The cross-subsidy surcharge and additional surcharge under sections 39, 40 and 42 of the Act shall be
determined as per the Open Access Regulations notified by the Commission as amended from time to
time;
Cross-subsidy surcharge shall also be payable by such open access consumer who receives supply of
electricity from a person other than the distribution licensee in whose area of supply he is located,
irrespective of whether he avails such supply through transmission/distribution network of the licensee
or not.
The consumers located in the area of supply of a distribution licensee but availing open access
exclusively on inter-State transmission system shall also pay the cross subsidy/additional surcharge.
63.2
The cross-subsidy surcharge and additional surcharge shall be considered as non-tariff income for retail
supply. The licensee shall provide the consumer category-wise details of the cross – subsidy and
additional surcharge received during the year along with the tariff filings.
63.3
The distribution licensee shall also submit along with ARR, requisite calculation for determination of
cross subsidy surcharge and additional surcharge for consideration of the Commission. The cross-
subsidy surcharge and additional surcharge shall be payable as determined by the commission from
time to time.
64
BAD AND DOUBTFUL DEBTS
Bad and doubtful debts shall be allowed to the extent the distribution licensee has actually written off bad
debts subject to a maximum of 0.5% of sales revenue. However, this shall be allowed only if the distribution
licensee submits all relevant data and information to the satisfaction of the Commission. In case there is any
recovery of bad debts already written off, the recovered bad debts will be treated as other income.
Treatment of Demand Side Management Initiatives
The Commission shall introduce various policies like Time of Day (ToD) Tariff pertaining to Demand Side
Management in order to flatten the Load Curve of the State and optimise the Power Purchase Cost.
Provided also that Distribution Licensee shall submit the utilization of funds allocated for DSM
schemes and shall maintain separate records of Revenue/Expenditure related to individual DSM schemes
approved by the Commission.
65
QUALITY AND RELIABILITY OF SUPPLY
65.1 Distribution Transformers failure rate
(i)
The commission shall specify the norms for maximum permissible distribution transformers’
failure rate separately for urban and rural areas in the MYT order;
(ii)
In case the maximum permissible failure rate of distribution transformers exceeds the limits
specified above, the return on equity in Rs. crores shall be reduced as mentioned below:-
For Rural Areas
Absolute increase (%) in distribution transformers
failure rate from the norm
Percentage reduction in ROE
(Rs. Crores).
0
0
>0≤5 %
1%
>5≤10 %
2%
>10≤15%
3%
>15≤20%
5%
>20
5%+ Absolute increase (%) / 20%
HARYANA GOVT. GAZ., NOV. 12, 2019 (KRTK. 21, 1941 SAKA)
[ PART III
468
For Urban Areas
Absolute increase (%) in distribution transformers
failure rate from the norm
Percentage reduction in ROE
(Rs. Crores)
0
0
>0≤2.5%
1%
>2.5≤5%
2%
>5≤7.5%
3%
>7.5≤10%
5%
>10 %
5%+ Absolute increase (%) / 10%
Example: In case actual damage rate is 7% against normative damage rate of 5%, then absolute
increase is 2 %.
(iii)
The distribution licensee shall maintain a proper record of failure of the distribution transformers
and submit the same in the quarterly report to the Commission.
65.2 Monitoring progress on Standards of Performance
(i)
The distribution licensee shall provide requisite report on the progress of compliance of the
performance parameters as specified in the HERC (Standards of Performance for the
Distribution licensee) Regulations, 2004 as amended from time to time;
(ii)
The transmission licensee shall also provide requisite report on the progress of compliance of the
performance parameters as may be specified by the Commission in the “Standards of
Performance for the Transmission Licensee Regulations” to be notified by the Commission and
as amended from time to time.
(iii)
In case the distribution/transmission licensee fails to submit the report to Commission or delays
the submission by more than 2 months, the commission may reduce the return on equity by
0.50% if the licensee is not able to provide adequate justification for the delay.
(iv)
The distribution licensee shall submit and upload on their website circle-wise quarterly report
containing the following for their respective circle: -
(a)
Details of expenditure along with cost benefits analysis of each expenditure costing
above Rs. 2.50 lakh.
(b)
Distribution loss along with the reason for loss above 15%.
(c)
Status of pending connections (numbers & load).
(d)
Sale of power and billing done in the previous quarter along with the status of recovery.
(e)
Failure rate of transformers under warranty/out of warranty separately for rural & urban
area.
(f)
Three phase and single-phase defective meters pending for replacement.
(v)
The distribution licensee shall not distribute power to any category of consumers free of cost. No
approval from the Commission shall be sought in this regard.
(vi)
The distribution licenseeshall submit Voltage wise loss dataalong-with their True-up Petitions.
65.3 Audited Information
The Distribution Licensees shall submit the following Audited Information for the relevant Financial Year
along-with their True-up Petitions:
(a)
Category wise Sales
PART III]
HARYANA GOVT. GAZ., NOV. 12, 2019 (KRTK. 21, 1941 SAKA)
469
(b)
Category-Wise Break up of Revenue Billed
o
Fixed Charges,
o
Energy Charges,
o
Fuel Adjustment Surcharge etc.
(c)
Category-wise Revenue Collected
66
FUEL AND POWER PURCHASE COST SURCHARGE ADJUSTMENT (FSA)
66.1
The distribution licensees shall recover FSA amount on account of increase in fuel and power purchase
costs from the consumers on a quarterly basis so as to ensure that FSA accrued in a quarter is recovered
in the following quarter without going through the regulatory process i.e. FSA for the quarter “July to
September” is recovered in the following quarter “October to December”.
66.2
FSA shall be calculated only in respect of approved power purchase volume including short term power
purchase cost, if any, for the relevant year from all approved sources. Drawl of power under UI
mechanism, if any, shall be allowed only when it is not in violation of grid discipline and shall be
subject to a price cap of average revenue realisation from all consumer categories for that year.
Average revenue realisation = (Total revenue assessed for electricity supply in Rs + Government
Subsidy in Rs.) / Total sales in Units.
66.3
For the purpose of recovery of FSA, power purchase cost shall include all invoices raised by the
approved suppliers of power and credits received by the distribution licensees during the quarter
irrespective of the period to which these pertain for any change in cost in accordance with tariff
approved by any regulator/ government agency mentioned in Regulation 59.4. This shall include
arrears/refunds, if any, not settled earlier. In case data of the last month in a quarter is not available for
calculating FSA to be levied in the following quarter, the licensee shall use an estimate based on
available data of the first two months of the quarter. On availability of the actual figures, the difference
on this account shall form part of FSA of the subsequent quarter. If the actual data for any quarter is not
made available by the licensee before the end of the following quarter for this adjustment, the FSA
finally allowed for that quarter based on actual figures supplied after the prescribed date shall be limited
to the earlier estimated amount or the amount based on the actual figures, whichever is lower.
66.4
In case of negative FSA, the credit shall be given to the consumers by setting off the minus figure
against the positive figure of FSA being charged from the consumers. In other words, credit of FSA
shall be given only against FSA being charged so that the base tariff determined by the Commission
remains unchanged.
66.5
Only the allowed percentage of transmission and distribution losses for the relevant year as per the
approved ARR shall be considered for working out FSA.
66.6
The amount of FSA shall be recovered by each distribution licensee by charging a uniform FSA (per
kWh) across all consumer categories in his area of license.
66.7
For moderation purposes, the recovery of per unit FSA shall be limited to 15% of the approved per unit
‘average power purchase cost’ or such other ceiling as may be stipulated by the Commission from time
to time. For calculating FSA, variations in quarterly purchase volume from an approved source are
allowed subject to an overall ceiling of annual approved volume from that source. In case a portion of
the FSA for any quarter is not recovered due to the ceiling of 15%, the under recovered amount shall be
added to the FSA for the next quarter.
66.8
Per unit rate of FSA (paisa/kWh) shall be worked out after rounding off to the nearest paisa;
66.9
The distribution licensee shall submit details relating to FSA recovery to the Commission for each
quarter in the following format by the end of the following quarter.
(i)
Approved power purchase volume from approved sources (MU)
(ii)
Approved power purchase cost (Rs. million)
(iii)
Actual power purchase volume (MU)
(iv)
Power purchased (MU) from sources not covered under Regulation 66.2 giving source
wise details and in case of UI the frequency at which UI drawls were made. (disallowed
power purchase).
(v)
Actual cost of power purchase from all sources except (iv) (Rs. million)
HARYANA GOVT. GAZ., NOV. 12, 2019 (KRTK. 21, 1941 SAKA)
[ PART III
470
(vi)
Actual cost of disallowed power purchase relating to (iv) (Rs. million).
(vii)
Total FSA estimated to be recovered for the quarter (Rs. million).
(viii)
FSA per unit (Rs./kWh) being recovered during the following quarter.
(ix)
Actual FSA recovered/estimated to be recovered out of estimated FSA till the end of the
following quarter (Rs. million)
(x)
Under/ over recovered FSA (vii-ix) (Rs. million).
(xi)
Approved sales (Consumer category wise / month wise) for the quarter (MU)
(xii)
Actual sales (Consumer category wise / month wise) for the quarter (MU)
(xiii)
Estimated sales, consumer category wise, for the following quarter (MU).
Note:
1.
All the source-wise details should be supported with requisite documentary evidence / invoices
raised by the generators / suppliers of the power.
2.
Actual sales to AP consumers are to be calculated in accordance with the methodology approved
by the Commission in the ARR for the relevant year.
66.10
FSA (Rs/kWh) shall be worked out as per the following formula:
Total FSA (Rs million) = PC + Int + AdJstQ + (AdJstA/4)
FSA (Rs / kWh) = {PC + Int + AdJstQ + (AdJstA/4)} ÷ PS
Where
PC = {(Actual average power purchase cost (Rs/kWh) for the quarter) -(Average power
purchase cost (Rs/KWh) approved by the Commission for the relevant year)} X PP
PP = Total volume of power purchase during the quarter worked out based on total
volume of powers sold to all the consumer categories grossed up by approved T&D loss.
Sales to AP consumers are to be worked out in accordance with the methodology
approved by the Commission in the ARR for the relevant year (MU).
PS = Estimated sales volume for the following quarter with AP sales as approved by the
Commission in the ARR for the relevant year (MU).
Actual average power purchase cost (Rs. /KWh) = (total cost of power purchased during
the quarter from approved sources and UI as per Regulation 66.2 in Rs million) / (total
volume of power purchased in the quarter from approved sources and UI in MU) as per
Regulation 66.2).
Int = Additional working capital cost allowed on account of FSA amount to be worked out
as under:
Int = {(total FSA/12) X (interest rate allowed for calculation of working capital in the
ARR of the current financial year)} in Rs. million.
AdJstQ = Under/over recovered FSA of the previous quarter in accordance with
Regulation 66.3 and 66.7 in Rs. million.
AdJstA = Annual adjustment amount based on truing up of the FSA of the previous year
by the Commission in Rs. million.
66.11
The licensee shall ensure that the Actual/ estimated FSA arising in a quarter is recovered in the
following quarter. In case the licensee does not ensure levy of FSA based on the methodology given
herein, the licensee shall have no claim to recover the FSA from the consumers in any manner in any
subsequent period except in accordance with Regulation 66(3) and 66(7). The unrecovered FSA for
the previous financial year, details of which are supplied to the Commission by the distribution
licensee, may either form part of power purchase cost for the next financial year or may be allowed to
be recovered as annual adjustment amount in the quarterly recovery of FSA in the next financial year
as the Commission may decide.
66.12 In case Government of Haryana decides to provide subsidy on account of FSA to a particular
consumer category, the amount of subsidy equivalent to the FSA recoverable from the concerned
consumer category, shall be deposited in advance by the Government Otherwise the recovery shall be
affected from the consumer through electricity bills. It shall be the responsibility of the distribution
licensees to seek prior approval of the State Government in this regard and maintain appropriate
record of the same.
PART III]
HARYANA GOVT. GAZ., NOV. 12, 2019 (KRTK. 21, 1941 SAKA)
471
67.
NON-TARIFF INCOME
67.1
All incomes being incidental to electricity business and derived by the licensee from sources, including
but not limited to profit derived from disposal of assets, rents, meter rent, income from investments
other than contingency reserves, miscellaneous receipts from the consumers, etc shall constitute non-
tariff income of the licensee;
67.2
The amount received by the distribution licensee on account of non-tariff income shall be deducted
from the aggregate revenue requirement in calculating the net revenue requirement.
Provided that the distribution licensee shall submit full details of his forecast of non-tariff
income to the Commission in such form as may be stipulated by the Commission from time to time.
Provided that Late Payment Surcharge and Interest on Late Payment earned by the Distribution
company shall not be considered under Non-tariff Income.
67.3
The “non-tariff income” shall include but shall not be limited to the following:
a.
Income from rent of land or buildings or other assets;
b.
Income from sale of land and other assets;
c.
Income from sale of scrap;
d.
Income from statutory investments;
e.
Income from interest on contingency reserve investment;
f.
Interest on advances to suppliers/contractors;
g.
Rental from staff quarters;
h.
Rental from contractors;
i.
Income from hire charges from contactors and others;
j.
Income from advertisements, etc.;
k.
Miscellaneous receipts;
l.
Interest on advances to suppliers;
m.
Excess found on physical verification;
n.
Deferred Income from grant, subsidy, etc., as per Annual Accounts;
o.
Prior period income, etc.
68.
SUBSIDY
68.1
Pursuant to Section 65 of the Electricity Act, 2003 in case the State Government requires grant of any
subsidy to any consumer or class of consumers in the tariff determined under Section 62, the
distribution licensee should ensure that the State Government shall, notwithstanding any direction
which may be given under Section 108, pay in advance the requisite amount as determined by the
Commission to compensate the distribution licensee affected by the grant of subsidy.
68.2 A tariff reflecting subsidy shall not be implemented except to the extent that the State Government has
paid the subsidy to the distribution licensee in advance of supply to the consumers of the distribution
licensee entitled to benefit from it. In publishing its tariff, the distribution licensee shall inform its
consumers that the approved tariff calculated without subsidy shall apply if the State Government
subsidy is not so paid as determined by the Commission. The, ‘bill’ issued by the distribution licensee
shall clearly indicate:
(a)
the tariff determined by the Commission;
(b)
the amount of State Government subsidy, the rate and period;
(c)
the net amount payable by the consumer;
68.3 The amount of subsidy agreed to by the State Government may be provided in the form of payment in
cash in advance as per section 65 of Electricity Act or by book adjustment of net dues payable by the
distribution licensee to the State Government. The book adjustment shall be done on the basis of cash in
hand with the distribution licensee and not on an accrual basis in respect of dues to be collected by the
distribution licensee from consumers on behalf of the State Government.
69An INTER CATEGORY CROSS–SUBSIDY
69.1
The distribution licensee’s tariff proposal should reflect the reasonable cost of providing service to each
consumer class. In case where tariffs are historically distorted with significant level of cross-subsidy,
the aim should be to gradually move to non-cross subsidized tariffs.
69.2
In the annual performance review and tariff application, the distribution licensee shall include a report
on how far they have implemented the cross-subsidy reduction trajectory approved by the Commission
for reduction of cross-subsidy and the measures being proposed in the current application to implement
the plan.
HARYANA GOVT. GAZ., NOV. 12, 2019 (KRTK. 21, 1941 SAKA)
[ PART III
472
PART VIII - FILING OF AGGREGATE REVENUE REQUIREMENT
70.
Capital Investment Plan and Business Plan Filings
The distribution licensee shall file by 1st June and the generating company and the transmission licensee by
1st August of the first year of the control period or any other date as may be directed by the Commission, an
application containing the following elements for the approval of the Commission, along with requisite fee in
accordance with the provision of HERC (Fee) Regulation, 2005:
(a)
Capital Investment Plan as per details specified in Regulation 9.
(b)
Business Plan as per details specified in Regulation 10.
71.
Tariff Filings
71.2
Tariff filing for the control period under MYT framework
71.2.1 The generating company and the licensees shall file an application for approval of ARR
for their respective businesses for each year of the control period and tariff for the first
year of the control period consistent with the business plan and the capital investment
plan approved by the Commission. The ARR and tariff filing shall be filed by 30th
November of the year preceding the 1st year of the control period along with requisite fee
in accordance with the provisions of Haryana Electricity Regulatory Commission (Fee)
Regulations amended from time to time. The application shall contain all the components
of the ARR and tariff as provided in these Regulations;
The MYT filing shall also contain an application for mid-year performance review of and
true – up petition.
71.2.2 The generation company and the licensees shall provide in the application forecast for
each year of the control period of the various financial and operational parameters of
ARR & various other components of the ARR and tariff relating to their respective
businesses as mentioned in these Regulations. The application, in case of a distribution
licensee and a transmission licensee shall also include:
(i) For distribution licensee
(a)
Sales / demand forecast for each consumer category and sub-categories for
each year of the control period and the methodology and rationale used;
(b)
Power procurement plan based on the sales forecast and distribution loss
trajectory for each year of the control period. The power procurement plan should
also keep in view energy efficiency and demand side management measures;
(c)
A set of targets proposed for other controllable items such as collection
efficiency, recovery of bad debts, working capital, quality of supply targets, etc.
The targets shall be consistent with the capital investment plan and business plan
approved by the Commission;
(d)
Expected revenue from the licensed business, non-tariff income and
income from other business for the base year and first year of the control period
and other matters considered appropriate by the distribution licensee(s);
(e)
Number of consumers in each category, connected load in kW / kVA.
Voltage wise estimates losses and cost of supply for various consumer categories
per kW and per kWh / kVh
(f)
The ARR for different years of the control period, the revenue gap and
tariff proposal for meeting the revenue gap for first year of the control period. The
tariff proposal should be based on the cost of supply for various consumer
categories and the cross-subsidy reduction road map.
(g)
Proposal for meeting the projected cumulative revenue gap for first year of
the control period which shall include mechanism for meeting the proposed
revenue gap, tariff revision for various consumer categories etc. In the absence of
PART III]
HARYANA GOVT. GAZ., NOV. 12, 2019 (KRTK. 21, 1941 SAKA)
473
tariff proposal, the application/petition shall be considered as incomplete and shall
be liable for rejection.
(h)
A statement of the effect of the proposed tariff changes on a typical small,
average and large consumer in each tariff class. For this purpose, a typical small
consumer is defined such that within the tariff class, 90% of the consumers
supplied under that tariff within a 12-month period would have greater total
expenditure on tariff charges than the small consumer. Similarly, a typical large
consumer is defined such that 90% of the consumers supplied under the tariff
would have lesser expenditure over a 12-month period than the typical large
consumer. The average consumer shall be defined as a consumer having
expenditure on tariff charges equal to the average expenditure in that tariff class.
(ii)
For transmission licensee
(a)
The Transmission system or network usage forecast for each year of the
Control Period, consistent with the Business Plan;
(b)
Proposal for transmission tariff design for each year of the Control Period,
including the losses to be charged and the procedure thereof;
(c)
Proposal for transmission tariff for each year of the Control Period
supported by the adequate justification;
(d)
Estimates of Transmission Capacity allocated to each of the Transmission
system user for each year of the control period;
(e)
Proposal for reactive energy charges;
(f)
Proposal for SLDC charges (in case SLDC is controlled by the
transmission licensee);
(g)
Expected Revenue from the licensed Business, Non-Tariff Income and
income from Other Business and other matters considered appropriate by the
Transmission Licensee.
71.3
The generating company and the licensee shall also provide a copy of their respective
ARR/tariff filing to each other and also host the same on their respective websites;
71.4 The generating company and the licensees, within 7 (seven) days of filing of the
application for approval of ARR/Tariff, shall publish in Hindi and English in daily
newspapers having circulation in the area of licensees /generation company, the contents
of the application filed for approval of ARR/Tariff in an abridged form in such manner as
the Commission may direct for information of the public and shall provide copies of the
application and other documents filed with the Commission at a price not exceeding
normal photocopying charges. The generating company and the licensees shall also host
the application and other documents on their official websites.
71.5 The distribution licensee shall undertake a separate study to estimate the cost of supply
for various consumer categories and submit the same to the Commission for its approval
along with the MYT filing;
71.6 The distribution licensee shall also undertake a study for preparation of road map for
reduction of cross-subsidy and submit the same to the Commission for its approval along
with the MYT filing;
71.7 Notwithstanding anything contained in these Regulations, the Commission may at all
times, either Suo motu or on a petition filed by any interested or affected party, determine
the tariff, including terms and conditions thereof, of any generating company or the
licensee;
71.8
Approval of provisional tariff for a generating station
A Generating Company may also file a petition, not more than six months prior to the
anticipated Date of Commercial Operation (COD), for determination of provisional tariff
of the Unit or Stage or Generating Station as a whole, as the case may be, based on the
HARYANA GOVT. GAZ., NOV. 12, 2019 (KRTK. 21, 1941 SAKA)
[ PART III
474
capital expenditure actually incurred up to the date of making the petition or a date prior
to making of the petition, duly audited and certified by the statutory auditors and the
provisional tariff shall be charged from the date of commercial operation of such Unit or
Stage or Generating Station, as the case may be.
Provided that the Generating Company shall file a fresh petition in accordance
with these Regulations, for determination of final tariff based on actual capital
expenditure incurred up to the date of commercial operation of the Generating Station
duly certified by the statutory auditors based on Annual Audited Accounts.
Provided further that any difference in provisional tariff and the final tariff
determined by the Commission and not attributable to the Generating Company may be
adjusted at the time of determination of final tariff for the following year as directed by
the Commission.
71.9 Filing for Mid-year performance review, True-up and determination of tariff for
ensuing year
The generating company and the licensees shall file their application for mid-year
performance review of the current year, true-up of the previous year and tariff for the
ensuing year along with requisite fee by 30th November of each year of the control period
as per the details mentioned in the Regulation 11 & 13 for the Commission’s review,
true-up of uncontrollable/controllable items in accordance with Regulation 8.3 and
approval of tariff for the ensuing year.
72.
TARIFF ORDER
72.1 The Commission shall, within one hundred and twenty (120) days from the receipt of complete
application and after considering all suggestions and objections received from the public/other
stakeholders:
(i)
Issue a tariff order accepting the application with such modifications or such conditions as may
be contained in such order; or
(ii)
Reject the application for reasons to be recorded in writing if such application is not in
accordance with the provisions of the Act and the rules and Regulations made thereunder or the
provisions of any other law for the time being in force and direct the licensee to resubmit the
application after such modifications/amendments as may be directed by the Commission.
Provided that the applicant shall be given a reasonable opportunity of being heard before
rejecting the application.
72.2 The tariff so determined by the Commission shall be in force from the date specified in the said order
and shall, unless amended or revoked, continue to be in force for such period as may be stipulated
therein.
73.
PUBLICATION OF APPROVED TARIFF
The generating company and the licensees, as the case may be, shall publish the tariff approved by the
Commission in Hindi and English in daily newspapers having wide circulation in Haryana and shall put up the
complete tariff petition, including annexure, and approved tariff / tariff schedule on its website and make
available for sale, a booklet containing such tariff or tariffs, as the case may be, to any person upon payment of
reasonable reproduction charges.
74.
PERIODIC REVIEWS
74.1 To ensure smooth implementation of the Multi Year Tariff (MYT) framework, the Commission may
undertake periodic reviews of performance during the control period, to address any practical issues,
concerns or unexpected outcomes that may arise.
74.2 The generating company and the licensee shall submit information as part of annual review on actual
performance to assess the performance vis-à-vis the targets approved by the Commission at the
beginning of the control period. This shall include annual statements of its performance and accounts
including latest available audited / actual accounts and the tariff worked out in accordance with these
Regulations.
74.3 The Commission may approve any modifications to the forecast of the generating company or the
licensee for the remainder of the control period, with detailed reasons for the same.
PART III]
HARYANA GOVT. GAZ., NOV. 12, 2019 (KRTK. 21, 1941 SAKA)
475
75.
SUMMARY OF TIMELINES
Generating company and the licensee shall adhere to the following schedule for various activities for the first
control period:
Time Schedule for various activities for the 2nd Control Period
Sr.
No.
Description
Filing of document
Obtaining
additional
information and
acceptance by the
Commission
Approval of the
document by the
Commission
1
Capital
Investment
Plan
By 1st June by distribution
licensee and by 1st August by the
generation company/ transmission
licensee for each year of the
control period
Within 30 days of
filing of document
Within 45 days of
acceptance of the
filing
2
Business Plan (to be
filed only at the
beginning of Control
Period)
By 1st June by distribution
licensee and by 1st August by the
generation company/ transmission
licensee (only once during the
control period)
Within 30 days of
filing of document
Within 45 days of
acceptance of the
filing or from the date
of receipt of
additional
information
whichever is later.
3
Filing of MYT
Petition (ARR and
Tariff Proposal for the
control period
By 30th November of the year
preceding the first year of the
relevant year of the control
period.
Within 30 days of
filing of document
Within 120 days of
acceptance of the
filing but by 1st of
april of the 1st year of
the control period in
any case
4
Mid-Year
Performance
Review/True-up
By 30th November of each year
of the relevant year of the control
period
Within 30 days of
filing of document
Within 120 days of
acceptance of the
filing
HARYANA GOVT. GAZ., NOV. 12, 2019 (KRTK. 21, 1941 SAKA)
[ PART III
476
PART IX – MISCELLANEOUS
76.
HEARING
76.1 The Commission may hold hearing(s) on the ARR/tariff filing and hear such persons as the
Commission may consider appropriate to decide on such ARR/tariff filing.
76.2 The procedure of hearing on the ARR/Tariff filing shall be as per the provisions of the HERC (Conduct
of Business) Regulations, in vogue or in the manner as the Commission may decide from time to time.
76.3 Where the Commission considers appropriate it may appoint a consultancy firm / external expert in
order to arrive at a just and fair conclusion in any matter before it and so appoints some consultancy
company, it may require the generating company and the licensee to bear for the costs of such
consultancy, which shall be allowed as a pass through in the ARR.
77.
ISSUE OF ORDERS AND DIRECTIONS
Subject to the provision of the Act and these Regulations, the Commission may, from time to time, issue orders and
directions in regard to the implementation of these Regulations and procedure to be followed on various matters.
78.
POWERS TO REMOVE DIFFICULTIES.
If any difficulty arises in giving effect to any of the provisions of these Regulations, the Commission may, by a
general or special order, not being inconsistent with the provisions of these Regulations or the Act, do or undertake to
do things or direct the generating company or the licensee to do or undertake such things which appear to be
necessary or expedient for the purpose of removing the difficulties.
79.
POWER TO RELAX
The Commission may in public interest and for reasons to be recorded in writing, relax any of the provision of these
Regulations.
80.
INTERPRETATION
If a question arises relating to the interpretation of any provision of these Regulations, the decision of the
Commission shall be final.
81.
SAVING OF INHERENT POWERS OF THE COMMISSION
81.1 Nothing in these Regulations shall be deemed to limit or otherwise affect the inherent power of the
Commission to make such orders as may be necessary for ends of justice or to protect consumers’
interest or to prevent the abuse of the process of the Commission.
81.2 Nothing contained in these Regulations shall limit or otherwise affect the inherent powers of the
Commission from adopting a procedure, which is at variance with any of the provisions of these
Regulations, if the Commission, in view of the special circumstances of the matter or class of matters
and for reasons to be recorded in writing, deems it necessary or expedient to depart from the procedure
specified in these Regulations.
81.3 Nothing in these Regulations shall, expressly or by implication, bar the Commission to deal with any
matter or exercise any power under the Act for which no Regulations have been framed, and the
Commission may deal with such matters, powers and functions in a manner it thinks fit.
82.
ENQUIRY AND INVESTIGATION
All enquiries, investigations and adjudications under these Regulations shall be done by the Commission through the
proceedings in accordance with the provisions of the Conduct of Business Regulations, 2004 as amended from time to
time.
83.
POWER TO AMEND
The Commission, for reasons to be recorded in writing, may at any time vary, alter or modify any of the provision of
these Regulations after following the due process.
84.
REPEAL
The Haryana Electricity Regulatory Commission (Terms and Conditions for Determination of Tariff for Generation,
Transmission, Wheeling and Distribution & Retail Supply under Multi Year Tariff Framework) Regulations, 2012
including its subsequent amendments shall stand repealed.
PART III]
HARYANA GOVT. GAZ., NOV. 12, 2019 (KRTK. 21, 1941 SAKA)
477
Appendix I
Procedure for Calculation of Transmission System Availability Factor
The procedure for calculation of Transmission System Availability Factor shall be governed as per CERC regulations,
issued from time to time.
Appendix II
Depreciation Schedule
S. No. Asset Particulars
Useful life (Years)
Depreciation Rate
for first 12 years of the useful life
w.e.f. COD (Salvage Value = 10%)
A
Land under full ownership
Infinite
0
B
Land under lease
(a)
for investment in the land
The period of lease or the
period remaining
unexpired on the
Assignment of the lease
0
(b)
for cost of clearing the site
The period of lease
remaining unexpired at
the date of clearing the
date
0
C
Assets purchased new
(a)
Plant and Machinery in generating
plants
(i)
Hydro electric
35
5.28%
(ii)
Coal based and WHRB based
thermal plants
25
5.28%
(iii)
Diesel electric and gas plant
15
5.28%
(b)
Cooling towers &Circulating Water
Systems
25
5.28%
(c)
Hydraulic works forming part of
the Hydro-electric project
(i)
Dams, Spillways, Weirs, Canals,
Reinforced
concrete flumes and siphons
50
5.28%
(ii)
Reinforced concrete pipelines and
surge tanks, steel pipelines, sluice
gates, steel surge tanks, hydraulic
control valves and hydraulic works
35
5.28%
D
Building & Civil Engineering
works of a permanent character,
not mentioned above
(i)
Offices and showrooms
50
3.34%
(ii)
Containing thermo-electric
generating plant
25
3.34%
(iii)
Containing hydro-electric
generating plant
35
3.34%
HARYANA GOVT. GAZ., NOV. 12, 2019 (KRTK. 21, 1941 SAKA)
[ PART III
478
S. No. Asset Particulars
Useful life (Years)
Depreciation Rate
for first 12 years of the useful life
w.e.f. COD (Salvage Value = 10%)
(iv)
Temporary erections such as
wooden structures
-
100%
(v)
Roads other than Kutcha roads
50
3.34%
(vi)
Others
50
3.34%
E
Transformers, Transformer
Kiosk, Sub-Station equipment &
other fixed apparatus (including
plant foundations)
(i)
Transformers including foundations
having rating of 100 KVA and over
25
5.28%
(ii)
Others
25
5.28%
F
Switchgear including cable
connections
25
5.28%
G
Lightning arrestors:
(i)
Station type
25
5.28%
(ii)
Pole type
15
6.33%
(iii)
Synchronous condenser
35
5.28%
H
Batteries
5
5.28%
I
Underground cable including
joint boxes and disconnected
boxes
35
5.28%
J
Cable duct system
50
5.28%
K
Overhead lines including
supports
(i)
Lines on fabricated steel towers
operating at nominal voltages
higher than 66 KV
35
5.28%
(ii)
Lines on steel supports operating at
nominal voltages higher than 13.2
KV but not exceeding 66 KV
25
5.28%
(iii)
Lines on steel or reinforced
concrete supports
25
5.28%
(iv)
Lines on treated wood supports
25
5.28%
L
Meters
15
5.28%
M
Self-propelled vehicles
5
9.50%
N
Air Conditioning Plants
(i)
Static
15
5.28%
(ii)
Portable
5
9.50%
PART III]
HARYANA GOVT. GAZ., NOV. 12, 2019 (KRTK. 21, 1941 SAKA)
479
S. No. Asset Particulars
Useful life (Years)
Depreciation Rate
for first 12 years of the useful life
w.e.f. COD (Salvage Value = 10%)
O
Office equipments
(i)
Office furniture and furnishing
15
6.33%
(ii)
Office equipment
15
6.33%
(iii)
Internal wiring including fittings
and apparatus
15
6.33%
(iv)
Street Light fittings
15
5.28%
P
Apparatus let on hire
(i)
Other than motors
5
9.50%
(ii)
Motors
15
6.33%
Q
Communication equipment
(i)
Radio and high frequency carrier
system
15
6.33%
(ii)
Telephone lines and telephones
15
6.33%
R
IT equipment
6
15.00%
S
Fibre optic
15
6.33%
T
Any other assets not covered
above
15
5.28%
By Order of the Commission
(Sd.)…,
Director / Tariff
HERC
[227-1]
57441—C.S.—H.G.P., Chd.