(402)

Haryana Government Gazette

Published by Authority

© Govt. of Haryana

No. 46-2019] CHANDIGARH, TUESDAY, NOVEMBER 12, 2019 (KARTIKA 21, 1941 SAKA)

PART III

Notifications by High Court, Advertisement, Notices and Change of Name etc.

HARYANA ELECTRICITY REGULATORY COMMISSION

Bays No. 33-36, Sector-4, Panchkula-134112, Haryana

Notification

The 31st October, 2019

Regulation No. HERC/46/2019.— The Haryana Electricity Regulatory Commission, in exercise of the

powers conferred on it by section 181 of the Electricity Act 2003 (Act 36 of 2003) and all other powers enabling it in

this behalf, after previous publication, hereby frames the following Regulations: -

PART - I PRELIMINARY

1.

SHORT TITLE, COMMENCEMENT, EXTENT, AND INTERPRETATION

1.1

These Regulations shall be called the Haryana Electricity Regulatory Commission (Terms and

Conditions for Determination of Tariff for Generation, Transmission, Wheeling and Distribution &

Retail Supply under Multi Year Tariff Framework) Regulations, 2019.

1.2

These Regulations shall come into force with effect from 1st April, 2020 and shall, unless otherwise

directed by the Commission, remain in force up to 31st March, 2025 for the duration of second control

period.

1.3

These Regulations shall extend to the whole of the State of Haryana.

2.

SCOPE OF APPLICATION

2.1

These Regulations shall be applicable to all existing and future Generating Companies, Transmission

Licensees / SLDC and Distribution Licensees and their successors/assignees, if any, and shall apply

where the Commission determines: -

(i)

tariff for supply of electricity by a generating company to a distribution licensee under section

62 and 64 of the Act;

(ii)

tariff for intrastate transmission of electricity by a transmission licensee to a distribution licensee

or to open access consumers under section 62 and 64 of the Act;

(iii)

State Load Dispatch Centre (SLDC) fees and charges under section 32(3) of the Act;

(iv)

tariff for wheeling, distribution & retail supply of electricity by a distribution licensee under

Section 62 and 64 of the Act;

(v)

tariff in all other cases where the Commission has the jurisdiction for tariff determination; and

(vi)

Cross-subsidy Surcharge in addition to the charges for wheeling under the first proviso to sub-

section (2) of section 42 of the Act, in accordance with the Open Access Regulations.

PART III]

HARYANA GOVT. GAZ., NOV. 12, 2019 (KRTK. 21, 1941 SAKA)

403

(vii)

Additional Surcharge in addition to the charges for wheeling under sub-section (4) of section 42

of the Act, read with the HERC Open Access Regulations, to meet the stranded fixed cost of

such distribution licensee arising out of its universal obligation to supply.

2.2

In case the tariff has been determined through transparent process of tariff based competitive bidding in

accordance with the guidelines issued by the Central Government as per Section 63 of the Electricity

Act, 2003, the Commission shall adopt such tariff in accordance with the provisions of the Act;

2.3

These Regulations shall not apply for tariff determination of renewable energy generation projects. The

tariff for such generation projects shall be determined as per Haryana Electricity Regulatory

Commission (Terms & Conditions for determination of Tariff from Renewable Energy Sources,

Renewable Purchase Obligation and Renewable Energy Certificate) Regulations, 2017 as amended

from time to time.

3.

DEFINITIONS AND INTERPRETATION

3.1

“Act” means the Electricity Act, 2003 (36 of 2003) as amended from time to time;

3.2

“Accounting Statement” for the purpose of these Regulations, shall include: -

(i)

Balance sheet / profit and loss statement prepared in accordance with the relevant schedule of

the Companies Act in vogue including as may be required under any other Regulations notified

by the Commission;

(ii)

Cash flow / fund flow statement in line with the relevant Accounting Standards of the Institute

of Chartered Accountants of India;

(iii)

Report of the Statutory Auditors,

(iv)

Cost Accounting Records, wherever applicable, as prescribed under Section 209(1)(d) of the

Companies Act in vogue.

3.3

“additional capitalization means the capital expenditure actually incurred or projected to be incurred

after the date of commercial operation of the project, up to the cut-off date, and admitted by the

Commission after prudence check.

3.4

“applicant” means a generating company or a transmission licensee or a distribution licensee or SLDC

who has made an application for determination of tariff / charges or an application for annual

performance review / true-up in accordance with these Regulations and the Act and includes a

generating company or a transmission licensee or a distribution licensee or SLDC whose tariff / charges

the subject of review by the Commission;3.4 “ARR” means Aggregate Revenue Requirement

comprising of allowable Operating Expenses (OPEX), Capital Expenditure (CAPEX) and Return on

Equity (RoE) for generation, transmission & SLDC and Wheeling& Retail supply of electricity by a

distribution licensee;

3.5

“Allocation Statement” means annual financial statement in respect of each of the separate businesses

of the Licensees, showing the amount of revenue, costs / expenses, assets, liability, reserves and basis

of provisions, if any which has been either:

(i)

charged from or to each such separate business together with a description of the basis of that

charge; or

(ii)

determined by apportionment or allocation between the Licensed/Regulated Business and every

other separate business of the Licensee/Generation Company, together with a description of the

basis of the apportionment or allocation:

Provided that ‘Allocation’ Statement’ shall not be construed as a substitute for

maintaining separate accounting statement for the licensed business and other businesses of the

Licensees.

Provided that the licensed business of a distribution and retail supply licensee(s) shall be

segregated as Wheeling Business (wires) and Retail Supply Business.

Provided that the licensed business of a transmission licensee(s) shall be segregated as

‘transmission businesses and ‘State Load Despatch businesses.

Provided that the generation company shall segregate its accounting data Unit Wise and

that such allocation statement in respect of a generating station shall be maintained in a manner

so as to enable tariff determination, stage-wise, Unit-wise and/or for the whole generating

station.

HARYANA GOVT. GAZ., NOV. 12, 2019 (KRTK. 21, 1941 SAKA)

[ PART III

404

3.6

“auditor” means an auditor appointed in accordance with the provisions of section 139 of Companies

Act, 2013 or any other law for the time being in the force;

3.7

“auxiliary energy consumption” or 'AUX' in relation to a period means the quantum of energy

consumed by auxiliary equipment of the generating unit / plant such as the equipment being used for

the purpose of operating plant and machinery including switchyard of the generating station and

transformer losses within the generating unit / plant, expressed as a percentage of the sum of gross

energy generated at the generator terminals of the generating unit / all the units of the generating plant;

Provided that AUX shall not include energy consumed for supply of power to housing colony

and other facilities at the generating station and the power consumed for construction works at the

generating station;

3.8

“availability”

(i)

in relation to transmission system for a given period means the time in hours during that period

the transmission system is capable to transmit electricity at its rated voltage and shall be

expressed in percentage of total hours in the given period and calculated as per the formula

specified in Appendix - I to these Regulations;

(ii)

in relation to a generating station, for a given period, it shall mean the average of the daily

declared capacities as certified by the State Load Despatch Centre (SLDC) for all the days

during the period expressed as a percentage of the installed capacity minus normative AUXc as

provided in these Regulations. The formula specified for the purpose shall be as under: -

Availability (%) =

)

100

(

10000

n

i

AUX

IC

N

DC

Where:

IC

=

Installed Capacity of the generating plant in MW,

DCi =

Average Declared ex-bus Capacity for all days during the period in MW,

N

=

Number of days in the given period,

AUXn =

Normative Auxiliary Energy Consumption as a percentage of gross generation,

∑

=

Summation from i = 1 to N;

3.9

“bank rate” shall mean the State Bank of India Marginal Cost of Funds based Lending Rate (MCLR)

of one-year tenor, prevalent at the beginning of the relevant financial year.

3.10

“base year” means the financial year immediately preceding the first year of the Control Period and

used for the purposes of these Regulations;

3.11

“beneficiary” in relation to a

(i)

“generating plant” means the person buying power generated at such a generating plant whose

tariff is determined under these Regulations.

(ii)

“transmission system” means the person who has availed of the transmission system on

payment of transmission charges determined under these Regulations. This includes a

distribution licensee, a transmission licensee, a person who has setup a captive power plant or a

generating company including merchant power plant or a consumer availing long-term or

medium-term open access utilizing such transmission system. Short-term open access consumers

will not be treated as beneficiaries;

(iii)

“SLDC” means the person who uses the services of SLDC and shall include distribution

licensee, transmission licensee, a person who has set up captive power plant or a generating

company including merchant power plant or a consumer availing long-term or medium-term

open access.

3.12

“block” in relation to a combined cycle thermal generating plant includes combustion turbine

generator(s), associated waste heat recovery boiler(s), connected steam turbine generator and

auxiliaries;

3.13

“CERC” means the Central Electricity Regulatory Commission;

3.14

“collection efficiency” means the ratio of total revenue realised to the total revenue billed during the

same financial year. The revenue realisation from arrears pertaining to the same financial year shall be

included but revenue realisation from late payment surcharge and arrears pertaining to the previous

years shall not be included for computation of collection efficiency;

PART III]

HARYANA GOVT. GAZ., NOV. 12, 2019 (KRTK. 21, 1941 SAKA)

405

3.15

“Commission” means the Haryana Electricity Regulatory Commission;

3.16

“conduct of business Regulation” means Haryana Electricity Regulatory Commission (Conduct of

Business) Regulations, 2004 as amended / re-enacted from time to time;

3.17

“control Period” means a multi-year tariff period fixed by the Commission from time to time. The

control period, under these Regulations, shall be of five years i.e. from 1st April 2020 to 31st March

2025.

3.18

“core business” for the purpose of these Regulations, means the regulated activities of the generating

company or the transmission licensee or the distribution licensee, as the case may be, and does not

include any other business;

3.19

“cut-off date” means 31st March of the year closing after two years of the year of commercial operation

of the project, and in case the project is declared under commercial operation in the last quarter of a

year, the cut-off date shall be 31st March of the year closing after three years of the year of commercial

operation;

3.20

“Change in Law” shall mean occurrence of the following events: -

(a)

enactment, bringing into effect or promulgation of any new Indian law; or

(b)

adoption, amendment, modification, repeal or re-enactment of any existing Indian law; or

(c)

change in interpretation or application of any Indian law by a competent court, Tribunal or

Indian Governmental Instrumentality which is the final authority under law for such

interpretation or application; or

(d)

change by any competent statutory authority in any condition or covenant of any consent or

clearances or approval or licence available or obtained for the project; or

(e)

coming into force or change in any bilateral or multilateral agreement or treaty between the

Government of India and any other Sovereign Government having implication for the

generating station or the transmission system regulated under these regulations.

“Provided that financial implication of change in law in relation to a PPA or TSA

shall be as may provide in the PPA or TSA”.

3.21

“date of commercial operation (COD)” means

(a) In relation to a generating unit, the ‘date of Commercial Operation declared by the generating

company after demonstrating the maximum continuous rating (MCR) or Installed Capacity (IC)

through a successful trial run after seven days’ notice to the beneficiaries and scheduling shall

commence from 00.00 Hrs of the day following the day of successful completion of trial run.

Additionally, the Generator shall certify that the said generation unit fully comply with the

applicable provisions and technical standards of the Central Electricity Authority (Technical

Standards for Construction of Electrical Plants an Electric Lines) Regulations, 2010 and Haryana

Electricity Regulatory Commission (Grid Code) Regulations, as amended and in vogue and / or re-

enacted.

(a)

In relation to the generating plant, the date of commercial operation of the last unit or block of

the generating plant;

(b)

In relation to Hydro Power Plants including PSP, CoD shall be the date declared by the

Generating Company after demonstrating peaking capacity corresponding to the installed

capacity of the generating station through successful trail run after seven days’ notice to the

beneficiaries and scheduling shall commence from 00.00 Hrs of the day following the day of

successful completion of trial run. Additionally, the Generator shall certify that the said

generation unit fully comply with the applicable provisions and technical standards of the

Central Electricity Authority (Technical Standards for Construction of Electrical Plants an

Electric Lines) Regulations, 2010 and Haryana Electricity Regulatory Commission (Grid Code)

Regulations, as amended and / or re-enacted.

Provided further, that in case a hydro generating station, with pondage, is unable to

demonstrate peaking capacity corresponding to the installed capacity due to insufficient

reservoir / pond level, the CoD shall be consider as the date of commercial operation of the last

unit of the generating unit. However, it shall be mandatory for such hydro generator to

demonstrate peaking capacity corresponding to the installed capacity as and when such reservoir

/ pond level is achieved. The same in the case of run-of-river shall be as soon as sufficient water

flow is available subsequent to the lean inflow season.

HARYANA GOVT. GAZ., NOV. 12, 2019 (KRTK. 21, 1941 SAKA)

[ PART III

406

(c)

in relation of transmission system, the date from 00.00 Hrs of charging the transmission system

or part thereof to its rated voltage level or seven days after the date on which it is declared ready

for charging by the transmission licensee, but is not able to charge for reasons not attributable to

the transmission licensee, its suppliers or contractors.

Provided in the case of dedicated transmission line / sub-station, the Generating

Company and the Transmission Licensee shall ensure that the transmission system is

commissioned well within the time frame agreed upon by them. However, in case the delay in

commissioning is on account of the generating station concerned, the transmission licensee shall

approach the Commission with an appropriate petition for approval of the CoD of such

transmission system or transmission element as such. However, any charges for the transmission

line/ sub-station not put in use due to reasons attributable to generating station shall be borne by

the generation company until such transmission line/ sub-station is put to use for evacuation of

power of the said generating station.

3.22

“declared capacity” or ‘DC’ means the capability of generating plant to deliver ex-bus electricity in

MW declared by such generating plant in relation to any time-block of the day or whole of the day,

duly considering the availability of fuel or water;

3.23

“De-capitalization” means reduction in Gross Fixed Assets (GFA) and reflected in the Fixed Assets

Register subsequent to removal of the assets as admitted by the Commission;

3.24

“Design Energy” in relation to hydro power plant means the quantum of energy that could be

generated in a 90 percent dependable year with 95 percent installed capacity of the generating station;

3.25

“Distribution Business” means the business of operating and maintaining a distribution system for

supplying electricity in the area of supply of the distribution licensee;

3.26

“Distribution wires Business” means the business of operating and maintaining the system for

wheeling of electricity in the area of supply of the distribution licensee;

3.27

“existing generating plant” means generating plants declared under commercial operation on or a date

prior to 31st March 2020;

3.28

“existing transmission system” means the transmission system declared under commercial operation on

or a date prior to 31st March 2020;

3.29

“Force Majeure’ for the purpose of these regulations shall mean the events or circumstances or

combination of events and circumstances including those stated below which partly or fully prevents

the generating company or transmission licensee or distribution licensee to complete the project within

the specified timeline in the investment approval, and only if such events or circumstances are not

within the control of the generating company or transmission licensee or distribution licensee and could

not have been avoided, had they taken reasonable care or complied with the prudent practices :

(a)

Act of God including lightening, drought, fire and explosion, earthquake, volcanic eruption,

landslide, flood, cyclone, typhoon, tornado, geological surprises, or exceptionally adverse

weather conditions which exceeds the statistical measures for the last hundred years; or

(b)

Any act of war, invasion, armed conflict or act of foreign enemy, blockade, embargo, revolts,

riot, insurgency, terrorist or military action; or

(c)

Industrial Strikes and labor disturbances having nationwide impact in India; or

(d)

Delay in obtaining statutory approval for the project except where the delay is attributable to the

project developer(s);

3.30

“gross calorific value” or ‘GCV’ in relation to a thermal power generating plant means the heat

produced in kCal by complete combustion of one kilogram of solid fuel or one litre of liquid fuel or one

standard cubic meter of gaseous fuel, as the case may be;

3.31

“station heat rate” or ‘SHR’ means the heat energy input in kCal required to generate one kWh of

electrical energy at generator terminals;

3.32

“infirm power” means electricity injected into the grid prior to the Scheduled COD or the date of

commercial operation of a unit or block of a generating plant whichever is earlier;

3.33

“installed capacity” or 'IC’ means the summation of the name plate capacities of all the units of the

generating plant or the capacity of the generating plant (reckoned at the generator terminals) approved

by the Commission from time to time;

3.34

“licensee” means any person or persons granted license under Section 14 or exempted under Section 13

of the Act including deemed licensee

PART III]

HARYANA GOVT. GAZ., NOV. 12, 2019 (KRTK. 21, 1941 SAKA)

407

3.35

“licensed business” means the functions and activities, which the licensee(s) is required to undertake

in terms of the licence granted by the Commission or as a deemed Licensee(s) under the Act;

3.36

“long-term transmission consumer” means a distribution licensee or a person having a long-term lien

for a period as defined in the open access Regulations notified by the Commission from time to time,

over an intra-State transmission system by paying all applicable charges for which appropriate

agreement has been entered into with the transmission licensee;

3.37

(a) “market operation function” means functions of scheduling, dispatch, metering data collection,

energy accounting & settlement, transmission loss calculation & apportionment, operation of pool

account & congestion charge account, administering ancillary services & information dissemination

and any other function assigned to the SLDC by the Electricity Act, 2003 or by HERC Regulations and

Orders;

(b) “market operation charges” means the charges, as approved by the Commission, to be recovered

by the SLDC from the users for performing market operation functions.

3.38

“maximum continuous rating” or ‘MCR’ in relation to a unit of the thermal power generating plant

means the maximum continuous output at the generator terminals, guaranteed by the manufacturer at

rated parameters, and in relation to a block of a combined cycle gas based thermal power generating

plant means the maximum continuous output at the generator terminals, guaranteed by the

manufacturer with water or steam injection, if applicable, and corrected to 50 Hz grid frequency and

specified site conditions;

3.39

“medium term transmission consumer” means a person having a medium-term lien for a period as

defined in the open access Regulations notified by the Commission from time to time over an intra-

State transmission system by paying all applicable charges;

3.40

(a) “new generating plants” means generating plants declared under commercial operation on a date

after 31st March 2020;

(b) “new transmission system” means the transmission system declared under commercial operation

on a date after 31st March 2020;

3.41

“operation and maintenance expenses” or “O&M expenses” mean the expenditure incurred on

operation and maintenance of the generating plant or transmission system or distribution system, as the

case may be, including part thereof, and includes the following expenditure:

a.

Employee cost (EC)

b.

Repair and Maintenance (R & M) expenses;

c.

Administration and General (A &G) expenses;

3.42

“plant load factor” or 'PLF’ for a given period, means the total sent out energy corresponding to

actual generation during the period, expressed as a percentage of sent out energy corresponding to

installed capacity in that period and shall be computed in accordance with the following formula:

PLF (%) =

)

100

(

10000

n

i

AUX

IC

N

G

Where:

IC

=

Installed Capacity of the generating Plant/Unit in MW,

Gi

=

Actual ex-bus Generation in MW for the ith time block of the period,

N

=

Number of Time Blocks during the period,

AUXn

=

Normative Auxiliary Energy Consumption as a percentage of gross

generation,

∑

=

Summation from i = 1 to N;

3.43

“project”

(a) In case of generation business comprising thermal generating station, all components of the

thermal generating station and shall include coal handling plant, pollution control system, effluent

treatment plan, as may be required;

HARYANA GOVT. GAZ., NOV. 12, 2019 (KRTK. 21, 1941 SAKA)

[ PART III

408

(b) In case of generation business comprising hydro generating station, all components of the

hydro generating station and shall include dam, intake water conductor system, power generating

station, as apportioned to power generation;

(c) In relation to the transmission business means a transmission system comprising specified

transmission lines, sub-stations and associated equipment including communication system;

(d) In relation to State Load Despatch Centre means any project associated with integrated

operation of power system in the State; and

(e) In relation to distribution business means a distribution system comprising specified

distribution lines, sub-stations and associated equipment;

3.44

“Prudence Check” means scrutiny of reasonableness of expenditure incurred or proposed to be

incurred, financing plan, use of efficient technology, cost and time over-run and such other factors as

may be considered appropriate by the Commission for determination of tariff;

3.45

“rated voltage” means the manufacturer’s design voltage at which the transmission/distribution system

is designed to operate or such lower voltage at which the line is charged, for the time being, in

consultation with supplier and receiver of electricity

3.46

“retail supply business” means the business of sale of electricity by a Distribution Licensee(s) to the

various categories of consumers within the area of supply in accordance with the terms of the License

for distribution and retail supply of electricity;

3.47

“revenue” means the amount billed or assessed to be billed at the applicable tariff including any fuel

price adjustments in the case of a Generating Company and in the case of distribution licensees shall be

inclusive of MMC, FSA or any other charges i.e. power factor surcharge, load / demand surcharge etc.

for sale of power.

3.48

‘Scheduled Energy’ means the quantum of energy scheduled by the State Load Dispatch Centre to be

injected into the grid by a generating station for a given time period;

3.49

“Scheduled generation” for any given time or time block means the quantum of ex-bus energy

scheduled by the State Load Dispatch Centre to be injected into the grid by a generating plant.

3.50

“short-term transmission consumer” in the context of usage of Transmission System means a person

having short-term lien for a period as defined in the open access Regulations notified by the

Commission from time to time over an intra-State Transmission System by paying all applicable

charges;

3.51

“State” means State of Haryana;

3.52

“State Load Dispatch Centre” or ‘SLDC’ means the centre established by the State Government

under section 31 of the Act for purposes of exercising the powers and discharging the functions under

Section 32 of the Act;

3.53

(a) “System Operation Functions” includes monitoring of grid operations, supervision and control

over the intra – state Transmission System, real – time operations for grid control, system restoration

following grid disturbances, compiling and furnishing data pertaining to system operation, congestion

management/co-ordination with RLDC, black start co-ordination and any other functions assigned to

the SLDC by the Electricity Act, 2003 or by HERC Regulations and Orders.

(b) “System Operation Charges” means the charges, as approved by the Commission, to be recovered

by the SLDC from the users for performing system operation functions.

3.54

“tariff ” means the schedule of charges for generation, transmission and distribution & retail supply of

electricity with terms and conditions applicable thereto;

3.55

“transmission service agreement” or ‘TSA’ means an agreement, contract, memorandum of

understanding, or any such covenant, entered into between the transmission licensee and the long-term

transmission consumer(s), as approved by the commission, for the use of transmission system

3.56

“transmission system” means a transmission line or a group of transmission lines inter-connected

together with or without associated sub-stations including equipment associated with transmission lines

and sub-stations;

PART III]

HARYANA GOVT. GAZ., NOV. 12, 2019 (KRTK. 21, 1941 SAKA)

409

3.57

Trial Run or Trial Operation: Trial Run or Trial Operation in relation to a thermal Generating Station

or a unit thereof shall mean successful running of the generating station or unit thereof on designated

fuel at Maximum Continuous Rating or Installed Capacity for a continuous period of 72 hours and in

case of a hydro Generating Station or a unit thereof for a continuous period of 12 hours:

Provided that:

(i)

The short interruptions, for a cumulative duration of 4 hours, shall be permissible, with

corresponding increase in the duration of the test. Cumulative Interruptions of more than

4 hours shall call for repeat of trial operation or trial run.

(ii)

The partial loading may be allowed with the condition that average load during the

duration of the trial run shall not be less than Maximum Continuous Rating, or the

Installed Capacity excluding period of interruption and partial loading but including the

corresponding extended period.

(iii)

Units of thermal and hydro Generating Stations shall also demonstrate capability to raise

load upto 105% or 110% of this Maximum Continues Rating or Installed Capacity, as the

case may be.

3.58

“unit” unit’ in relation to a thermal power generating plant means steam generator, turbine-generator

and auxiliaries, or in relation to a combined cycle gas based thermal power generating plant, means

turbine-generator, waste heat recovery plant and auxiliaries‘and in relation to a hydro generating station

means turbine-generator and its auxiliaries’;

3.59

“unscheduled interchanges” or ‘UI’ means the unscheduled interchange of energy as mentioned in the

Indian Electricity Grid Code or as defined in the Intra State ABT Regulations of HERC as may be

notified from time to time;

3.60

“wheeling” means the operation whereby the distribution system and associated facilities of a

transmission licensee or distribution licensee, as the case may be, are used by another person for the

conveyance of electricity on payment of charges to be determined under section 62 of the Act;

3.61

“wheeling business” means the business of operating and maintaining a distribution system for

conveyance of electricity in the area of supply of the distribution licensee;

3.62

“Year” means the financial year i.e. a period commencing on 1st April of a calendar year and ending on

31st March of the subsequent calendar year;

(a)

“Current Year” means a year in which the petition for aggregate revenue requirement or

determination of tariff is to be filed;

(b)

“Ensuing Year” means the year immediately following the current year; and

(c)

“Previous Year” means the year immediately preceding the current year

3.63

“Technical Minimum Schedule” in respect of State Generating Stations shall have the same meaning

as provided in Regulation 34 of these Regulations.

Words appearing in these Regulations and not defined shall bear the same meaning as in the Act. All

other expressions used herein but not specifically defined herein but defined in the Act shall have the

meaning assigned to them in the Act. The expressions used herein but not specifically defined in the

Regulations or in the Act but defined under Haryana Electricity Reform Act, 1997 (Act 10 of 1998)

shall have the meaning assigned to them under the said Act, provided that such definitions in the

Haryana Electricity Reform Act, 1997 are not inconsistent with the provisions of the Electricity Act,

2003.

HARYANA GOVT. GAZ., NOV. 12, 2019 (KRTK. 21, 1941 SAKA)

[ PART III

410

PART II - MULTI YEAR TARIFF FINANCIAL PRINCIPLES

4.

GENERAL

4.1

The Commission, in specifying these Regulations, is guided by the provisions of Sections 61 and 62 of

the Electricity Act, 2003, the National Electricity Policy and the National Tariff Policy notified by the

Central Government under Section 3 of the Act as amended from time to time as well as the relevant

Regulations notified by the Central Commission.

4.2

The Commission shall adopt Multi Year Tariff (MYT) framework for determination of ARR/tariff for

each year of the Control Period from the FY 2020-21 i.e. 1.04.2020.

4.3

Basis of implementation of Multi Year Tariff framework: -

The implementation of MYT framework shall be based on the following: -

(a)

The capital investment plan and the business plan for a period not less than the control period to

be submitted by the utilities for their respective businesses along with the MYT Petition;

Provided that to begin with, the generating companies and the licensees may file their

business plan by the end of January 2020 and the first-year investment plan with the respective

MYT Petition for the second control period under these Regulations.

(b)

The forecast for each year of the control period of the various financial and operational

parameters of ARR, based on reasonable assumptions, to be filed by the utilities for their

respective businesses;

(c)

The trajectory for specific variables as may be stipulated by the Commission, where the

performance of the utilities for their respective businesses is sought to be improved under

incentive and penalty framework;

(d)

The mid-year performance review vis-a-vis the approved forecast and variations in performance

of controllable and uncontrollable items;

Provided that the Generating Company and the Licensees shall submit their Accounting

Statements / Segmented Accounts / Allocation Statement to support their claims / assessment

including reasons of variations in various expenses, at the time of performance review / Truing-

up.

(e)

The mechanism for sharing approved gains or losses on account of controllable items;

(f)

The mechanism for pass through of approved gains or losses on account of uncontrollable items.

Provided that the Commission shall apply prudence check with regard to the following: -

(i)

Revenue from Sale of Power- whether consumer category wise sales projections are

backed up by consumer category wise time series data on connected load / contract

demand, sales trend, number of consumers and any abnormal increase / decrease has been

adequately explained.

(ii)

Billing Efficiency - measured as a percentage of Units billed by the distribution licensee

to the total units injected into the distribution system.

Provided that in the case of a transmission licensee, the same shall be expressed as a

percentage of units injected into the transmission system’

(iii)

Revenue Collection Efficiency- shall be measured as a percentage of revenue realised by

a generating company / Licensee against the total amount billed excluding arrears.

(iv)

Reduction in outstanding receivables from consumers including un-paid RE Subsidy, if

any and beneficiaries in the case of transmission licensees and Generating Company.

(v)

Percentage of consumers billed on the basis of meter reading to the number of consumers

billed on average / assessed basis.

(vi)

Revenue Expenditure including interest payments on term loan / working capital loans

vis-a-vis revenue earned. Any revenue expenditure in excess of revenue earned shall be

supported by a detailed justification including source of funding at the time of Truing-up;

(vii) Merit Order scheduling of power in line with requirement and additional revenue earned

over and above the average power purchase cost on trading of surplus power;

(viii) Assessment of financial and physical progress of Capital Expenditure under each head

vis-a-vis the schedule submitted and approved by the Commission. In case of any

deviation in Capital Expenditure including Capitalisation, the generating company /

Licensee shall submit a detailed justification at the time of truing-up. The loan drawl

should be matched with physical progress of Capital Works undertaken under each head.

PART III]

HARYANA GOVT. GAZ., NOV. 12, 2019 (KRTK. 21, 1941 SAKA)

411

4.4

Tariff during the control period: The Commission shall determine the ARR for each year of the control

period and tariff for the first year of the control period separately for Generation Company (ies),

transmission licensee(s) / SLDC and distribution licensee(s).

4.5

The tariff applicable to each business in each of the remaining years of the control period shall be

notified by the Commission through a separate order after taking into consideration the following: -

(a)

Mid-year performance review;

(b)

Specified performance targets;

(c)

True-up of uncontrollable items as defined in Regulation 8.3 and of controllable items as

provided in regulation.

4.6

There will be no true-up of the controllable items except on account of Force Majeure events or on

account of variations attributable to uncontrollable items. The variations in the controllable items, as

defined in Regulation 8.3, over and above the norms specified will be governed by incentive and

penalty framework specified in these Regulations.

4.7

The tariff determined by the Commission and the directions given in the MYT order shall be quid pro

quo and mutually inclusive. The tariff determined shall, within the time period specified in the order, be

subject to the compliance of the directions by the generating company and the licensees to the

satisfaction of the Commission. Non-compliance of the directions shall lead to such amendment,

revocation, variations and alterations in the tariff, as may be ordered by the Commission. Further non-

compliance of directions given in the tariff order may also lead to invocation of the provisions of

section 142 and 146 of the Electricity Act, 2003.

Provided the Generation Company and / or the Licensee may seek extension in time for

compliance of the directives with appropriate justification to the satisfaction of the Commission.

4.8

The tariff determined by the Commission shall continue to be applicable till it is modified / amended or

revised by the Commission.

4.9

The norms specified under these Regulations are the ceiling norms and this shall not preclude the

generating company and/or licensee or any other person, as the case may be, from agreeing to improved

norms of operation. In case the improved norms are agreed to, such norms shall be applicable for

determination of tariff.

5.

PLANT WISE COMPUTATION OF TARIFF FOR GENERATING COMPANY

5.1

The tariff for the generating company shall be determined plant-wise. Following shall be the

categorization for the existing thermal plants of State Generator i.e. HPGCL: -

S.No.

Plant

Capacity (MW)

1

Panipat TPS Unit 5 & 6

Unit-5:

Unit-6:

210

210

2

Panipat TPS Unit 7 and 8

Unit-7:

Unit-8:

250

250

3

DCR TPS Yamunanagar

Unit-1:

Unit-2:

300

300

4

Rajiv Gandhi TPS Khedar (Hisar)

Unit-1:

Unit-2:

600

600

5.2

The generating company shall prepare its annual accounts in a manner such that all individual plants /

units are treated as separate business entity including any new plant that may be commissioned during

the control period.

5.3

The operational norms for each generating plant shall be specified unit-wise. Therefore, the statement

of account should also include the unit-wise performance parameters for each plant.

5.4

The generating company shall file the tariff petition as per the above categorization. All plants indicated

above and the plants which may be commissioned during the control period shall have separate

interface metering with the transmission licensee(s) as per CEA (Installation and Operation of Meters)

Regulations, 2006 as amended from time to time and, as and when intra state ABT is implemented,

HARYANA GOVT. GAZ., NOV. 12, 2019 (KRTK. 21, 1941 SAKA)

[ PART III

412

different power plant, as categorised above, shall be scheduled separately as per the intra State ABT

Regulations as may be notified by the Commission from time to time.

Provided that a Generation entity may file an application for determination of provisional tariff

for a new generating station or Unit(s) six months prior to the scheduled date of commissioning.

5.5

For the plants, if any, not covered under ABT the Commission may determine, single part tariff based

on a normative PLF.

Provided the Commission may determine tariff for hydro power projects up to 25 MW

separately as per the norms specified in the HERC RE Tariff Regulations in vogue.

5.6

‘target / normative availability’ and ‘target / normative PLF’ shall be construed as normative

availability and normative PLF till such the time power plants are brought under intra-State ABT

framework.

6.

ARR / Tariff OF TRANSMISSION BUSINESS AND SLDC

6.1

The transmission licensee i.e. Haryana Vidyut Prasaran Nigam (HVPN) has been notified as the State

Transmission Utility by the Haryana Government as per Section 39(1) of the Act and has also been

entrusted with the operation of SLDC. Accordingly, HVPN shall submit separate ARR for its

transmission business and SLDC business, as long as it remains under its control, as per provisions of

these Regulations.

6.2

The HVPN shall maintain separate accounts for SLDC and transmission business. Till accounts are

segregated, STU shall prepare an Allocation Statement to apportion costs and revenues to respective

businesses. The Allocation Statement shall be considered by the Commission only if it is certified by

the Statutory Auditor/Cost Auditor and approved by the Board of Directors of the STU, and it shall be

accompanied with an explanation of the methodology which shall be consistent over the Control

Period.

6.3

After a Government company or an authority or a corporation is established or constituted for operation

of SLDC by or under any State Act, as may be notified by the State Government as per provisions of

Section 31 of the Act, the ARR for SLDC business shall be submitted by such Government company,

authority or corporation, as the case may be, as per provisions of these Regulations.’

6.4

The Commission may require the STU or the Government company/Authority/Corporation established

for operation of SLDC or the SLDC itself to submit such details/information as may be required for

determination of SLDC charges. Further, the Commission may give directions to SLDC in relation to

the role and functioning of SLDC.

6.5

The transmission tariff determined by the Commission shall comprise all or any of the following: -

(i)

Transmission System Access Charges (TSAC);

(ii)

Annual Transmission Charges (ATC);

(iii)

Per Unit charges for energy transmitted (Rs/kWh or kVAh);

(iv)

Reactive Energy Charges (Rs / kVARh);

ATC, for each financial year of the control period shall be designed to recover the ARR of the

Transmission Licensee for the respective financial year as approved by the Commission.

The ARR shall comprise of the following: -

(ii)

Operation & Maintenance Expenses (O&M)

Administrative & General Expenses (A&G);

Employees Expenses (working & retired);

Repair & Maintenance (R&M);

(iii)

Depreciation;

(iv)

Interest Expenses

on term loan (IoTL);

on working capital loan (IoWC);

(v)

Return on Equity (RoE)

(vi)

Income Tax / MAT

(vii)

Foreign Exchange Rate Variation (FERV) applicable on foreign currency loans.

PART III]

HARYANA GOVT. GAZ., NOV. 12, 2019 (KRTK. 21, 1941 SAKA)

413

Provided that Non-Tariff Income, Income from Open Access Consumers and income from

intrastate transmission lines designated as interstate transmission lines wherein Yearly Transmission

Charges are recovered through Point of Connection (PoC) charges as per CERC Regulations / Order(s),

shall be deducted while determining ATC recoverable by the transmission licensee(s) from its long-

term beneficiaries.

Provided that Non-Tariff Income shall include, but not limited, to Income from rent of

land/building, sale of scrap, investments/advances, rentals, supervision charges for capital works, sale

of tender/documents/advertisements etc.

6.6

The Commission may implement a transmission pricing mechanism for transmission licensee in such a

way so as to align intra-State transmission pricing mechanism with the inter-State transmission pricing

mechanism as adopted by the Central Electricity Regulatory Commission in line with the National

Tariff Policy of the Government of India.

Provided the existing transmission licensee / STU are able to collect and collate sufficient data /

underlying assumptions including voltage wise transmission loss allocation factor w.r.t. distance

sensitive cost of transmission after undertaking a detailed study relating the hybrid method (PoC

methodology of CERC bringing together the marginal and average participation approach) and load

flow study including its likely impact on the beneficiaries of transmission services along with the

timelines for implementing the same.

6.7

The aggregate revenue requirement, net of deductions and other income, for transmission business as

approved by the Commission for the control period shall be the total cost of the transmission system

(ATC). The ATC shall be recovered from all the users of the Transmission System for the respective

year(s) of the control period as per the formula specified herein.

ATC = ∑n

i=1 ARRi – NTIi – OIi )

The notations are as explained below:-

ATC = Total Transmission System Cost of the relevant year of the Control Period.

n = Number of Transmission Licensee (in case more than one except those selected through

competitive bidding mode u/s 63 of the Electricity Act, 2003).

NTI = Non-Tariff Income as approved by the Commission for the ith year of the Control Period.

OI = Other Income i.e. income from any business of the transmission licensee other than the regulated

business income / revenue from which is required to be shared for the ith year of the Control Period.

Provided that the ATC, as determined by applying the ibid formula shall be either:-

i) Shared by the long-term beneficiaries of the Transmission System in proportion to the respective

transmission system of each user of the transmission system allotted in the intra-state transmission

system.

Or

Depending on the availability and reliability of the recorded data_.

ii) Average of the respective projected simultaneous maximum peak (co-incidental system peak) and

non-coincidental peak for each long-term transmission system users.

Provided that the above shall be subject to truing – up on availability of actual data of co-

incidental and non-coincidental system peak as per the dispensation of truing-up provided in these

Regulations.

Provided also that the base transmission tariff for short term users including Open Access

Consumers shall be determined in accordance with the following formula:-

TT = ATC / ∑n

i=1 (Energy Transmitted by Transmission Licensee)

Where:

TT = Transmission Tariff (Rs/kWh)

ATC = Total Transmission System Cost of the relevant year of the Control Period.

Provided that the energy (kWh) transmitted by the transmission licensee(s) shall be as projected

by the transmission licensees in their MYT petition and approved by the Commission after following

the due process. Any variation in projected / approved and actual shall be trued up at the time of mid-

term on availability of audited data / information.

HARYANA GOVT. GAZ., NOV. 12, 2019 (KRTK. 21, 1941 SAKA)

[ PART III

414

6.8

Provisional Transmission Tariff

6.9

The Commission, on a petition filed by the existing Transmission Licensee or a new Transmission

Licensee in Haryana, shall determine and approve transmission tariff under these Regulations on a

provisional basis.

Provided a petition for determination of provisional transmission tariff is filed before the

Commission at least six months prior to the anticipated / scheduled date of commercial operation of the

transmission system.

6.10

The petition for determination of provisional transmission tariff shall inter alia include the following: -

(i)

Capital Expenditure incurred and projected to be incurred up to the date of scheduled

commercial operation including additional capital expenditure incurred duly certified by the

statutory auditor.

(ii)

Details of all the underlying assumptions

(iii)

Based on the above, provisional transmission tariff shall be determined and allowed from the

scheduled date of commercial operation.

Provided in the case the CoD is delayed beyond six months from the date of

Commission’s Order determining / approving provisional transmission tariff, the said Order

shall cease to be applicable and the Petitioner shall be required to file a tariff petition afresh after

the date of CoD.

(iv)

The transmission licensee shall file a petition for determination of final tariff transmission tariff

within six months from the date of CoD based on the audited capital expenditure and

capitalisation as o the date of CoD of the transmission project.

(v)

The Commission shall determine final tariff based on prudence check of the audited capital

expenditure and capitalisation thereto as on date of CoD including but not limited to

benchmarking capital expenditure and capitalisation against similar transmission projects

commissioned elsewhere in the country.

Provided where the final transmission tariff determined / approved by the Commission is

+/- 5% of the provisional tariff, the differential amount shall be restored / recovered from the

beneficiaries along with interest rate as may be considered reasonable by the Commission

subject to the ceiling of the interest rate allowed to the transmission licensee on its working

capital loans.

7.

WHEELING (PURE WIRES) AND RETAIL SUPPLY BUSINESS

7.1

The distribution licensee shall segregate the accounts of the licensed business into Wheeling Business

and Retail Supply Business and submit separate ARRs for the respective businesses. The ARR,

approved by the Commission, for Wheeling Business, shall be an input to determine wheeling charges

recoverable from Open Access consumers and the ARR for Retail Supply Business, as approved by the

Commission, shall be considered to determine Retail Supply tariff for sale of electricity to different

categories of consumers of the distribution licensee which will be inclusive of wheeling charges.

Provided that till such time the accounts are segregated, as per provisions of these Regulations,

the distribution licensee shall prepare an allocation statement to apportion costs and revenues to

respective business. The allocation statement shall be approved by the Board of Directors of the

distribution licensee and accompanied with an explanation of the methodology which should be

consistent over the control period under these Regulations.

8.

MYT APPROACH

8.1

Base Line values- The Commission shall determine baseline values for various financial and

operational parameters of ARR for the control period taking into consideration such parameters

approved by the Commission in the past, actual average figures of last three years, audited accounts,

estimate of the figures for the relevant year, Industry benchmarks/norms and other factors as may be

considered appropriate by the Commission;

8.2

Control Period – The second control period under Multi-Year Tariff framework shall be a period of

five (5) years commencing from 1st April 2020.

8.3

The Aggregate Revenue Requirement (ARR) of the Distribution Business (wires) to be recovered

through wheeling charges of the distribution licensee(s) shall comprise the following: -

(i)

Interest on Term Loan

PART III]

HARYANA GOVT. GAZ., NOV. 12, 2019 (KRTK. 21, 1941 SAKA)

415

(ii)

Interest on normative Working Capital

(iii)

Interest on deposits from distribution system users

(iv)

Depreciation

(v)

Operation & Maintenance Expenses

(vi)

Return on average (opening + closing) Equity for the relevant year

(vii) Provision for bad and doubtful debts as may be admitted by the Commissions subject to the

ceiling of 0.5% of the account receivable as per the audited accounts of the relevant year.

Provided that the wheeling charges shall be net of i) Non-Tariff Income, ii) Income from Other

Business (ARR – (Non-Tariff Income + Income from Other Business).Non-Tariff Income shall include

rent from land / building, sale of scrap, investment income, interest earned on advances to suppliers /

contractors, rental income from staff quarter / guest houses, income from schedule of charges, income

from supervision charges for capital works, income from sale of tender documents, income from

advertisements etc.

Provided also, prior period income / expenses shall be allowed by the Commission at the time of

truing-up based on the audited accounts on a case to case basis subject to prudence check. However, all

penalties payable by the distribution licensee arising from Commission’s order, courts / tribunal, CGRF

/ Ombudsman shall not be allowed to be recovered through ARR.

8.3.1 The method of recovery of the Distribution charges (wires business) shall either be on the basis

of energy wheeled basis (Rs. kWh / kVAh) or on the basis of contracted capacity

(Rs/kW/kVA/month) as considered appropriate by the Commission.

8.3.2 Distribution Loss (%) / Aggregate Technical & Commercial loss (%) shall be as determined by

the Commission in the Order in the MYT petition filed by the power utilities.

Provided that for wheeling transactions, the voltage wise wheeling loss shall be

determined by the Commission in the MYT petition filed by the power utilities.

Provided for the above, the voltage wise technical losses shall be projected by the power

utilities based on system configuration and capital investment plan.

8.3.3 O&M Expenses (Wires Business) shall comprise of Employees Cost, Repair & Maintenance

Expenses (R&M), Administrative & General Expenses (A&G).

Provided that between Distribution (Wires) and Retail Supply Business, the individual

components of O&M Expenses shall be allocated, based on the segregated accounts/ allocation

statement submitted by the Licensee

8.3.4 The Aggregate Revenue Requirement of the Retail Supply Business to be recovered through

retail supply tariff of the distribution licensee(s) shall comprise the following: -

(i)

Power Purchase Cost

(ii)

Transmission Charges (Inter State & Intra State)

(iii)

Interest (Term Loan and normative Working Capital Loan, Consumer Security Deposit)

(iv) Depreciation

(v)

Operation & Maintenance Expenses

(vi) Provision for bad and doubtful debt subject to a ceiling of 0.5% of the account receivable

as per the latest available audited accounts.

(vi)

Return on Equity Capital

Provided that the ARR computed as per above shall be net of Non-Tariff Income, income

from Other Business, receipts from cross – subsidy surcharge and additional surcharge etc.

Provided further that the prior period expenses shall be considered at the time of truing –

up on a case to case basis subject to prudence check. However, all penalties payable by the

distribution licensee arising from Commission’s order, courts / tribunal, CGRF / Ombudsman

shall not be allowed to be recovered through ARR.

Provided that the Commission shall determine the distribution / AT&C loss trajectory in

the annual tariff Order after reviewing the actual losses including feeder wise loss levels in the

FY 2019-20 and beyond.

HARYANA GOVT. GAZ., NOV. 12, 2019 (KRTK. 21, 1941 SAKA)

[ PART III

416

8.3.5 Power Procurement: The distribution licensee shall procure power from the sources for which

Power Purchase Agreement has been approved by the Commission. The power procurement

plan shall be prepared incorporating aspects of peak support / peak shifting, ramping

requirements, ancillary services, grid security and deviation management. This shall be done by

way of including provision for Energy Storage Systems in the power procurement plan

Provided that for any procurement from medium to short term contracts that may be

required, the distribution licensee(s) shall obtain prior approval of the Commission with

supporting data / details along with proper justification.

Provided that the power procurement plan submitted for the control period shall comprise

of quantitative forecast of quantum and cost of the unrestricted base load and peak load demand

in its licensed area. An estimate of month wise availability of power to meet base load and peak

load demand both in terms of megawatt (MW) and Million Units (kWh). The procurement plan

shall inter-alia include action plan regarding energy conservation, energy efficiency and demand

side management.

Provided further that the power procurement plan shall also include procurement of

renewable energy or renewable energy certificate in case the available RE Sources are not

sufficient to meet with the RPO trajectory as specified by the Commission including backlog, if

any, allowed by the Commission during the previous year(s).

Provided that the Distribution licensee(s) shall share its power procurement plan with the

State Transmission Utility in order to maintain consistency in the intra-state transmission system

planning.

8.3.6 Power Purchase Agreement (PPA) – The Commission shall consider approval of PPA in the

light of the approved power procurement plan either u/s section 86(1)(b) or 63 of the Act.

Provided that all such PPAs shall be submitted in the Commission with complete

documentations and adherence to the relevant guidelines and policy. Further, no PPA /

Supplementary Agreement shall be executed without the prior approval of the Commission.

Provided that the Commission shall approve the PPA as such or with appropriate

modifications or reject the same after holding public / Stakeholders consultation on the same and

if the same is not in conformity to the level of transparency required including competitiveness

of the project or is found to be in violation of relevant statute / guidelines, the same shall not be

admitted and rejected outrightly.

8.3.7 The O&M norms for the retail supply business shall be same as in the case of Distribution

(Wires) business.

8.3.8 Controllable and Uncontrollable items of ARR

(a)

For the purpose of this Regulation, the items of ARR shall be identified as 'controllable'

or 'uncontrollable'. The variation on account of uncontrollable items shall be treated as a

pass-through subject to prudence check/validation and approval of the Commission;

Provided that the Commission may allow variations in controllable items on

account of Force Majeure events, as defined under these Regulations and also those

attributable to uncontrollable factors as pass-through in the ARR for the ensuing year

based on actual values submitted by the generating company and licensees and

subsequent validation and approval by the Commission during true-up.

(b)

The items in the ARR shall be treated as ‘controllable’ or ‘uncontrollable’ as follows: -

ARR Element

Controllable/ Uncontrollable

Interest and Finance Charges

Controllable

Return on Equity

Controllable

Availability

Controllable

Plant availability factor

Controllable

Heat Rate

Controllable

Auxiliary Energy Consumption

Controllable

PART III]

HARYANA GOVT. GAZ., NOV. 12, 2019 (KRTK. 21, 1941 SAKA)

417

ARR Element

Controllable/ Uncontrollable

Secondary Fuel Oil Consumption (SFC)

Controllable

O&M

Expenses

(excluding

terminal

liabilities with regard to employees on

account of changes in pay scales or

dearness allowance due to inflation)

Controllable

Terminal

liabilities

with

regard

to

employees on account of changes in pay

scales or dearness allowance due to

inflation

Uncontrollable

Depreciation

Controllable

Transit loss of coal

Controllable

Capital Expenditure

Controllable

All statutory levies and taxes, if any

excluding tax on Income

Uncontrollable

Fuel Price (excluding that pertaining to

domestic

coal

procured

through

e-auction/open market and imported coal)

Uncontrollable

Fuel Price pertaining to domestic coal

procured through e-auction /open market

and imported coal

Controllable

GCV of Fuel (excluding domestic coal

procured through e-auction/open market

and imported coal)

Uncontrollable

GCV of domestic coal procured through

e-auction/open market and imported coal

controllable

Distribution

Losses

(technical

and

commercial including bad debts)

Controllable

Collection Efficiency

Controllable

Energy Sales (excluding interstate and

inter Discom energy sales)

Uncontrollable

Interstate and inter Discom energy sales

Controllable

Power Purchase Price (other than for

short-term power purchase and UI)

Uncontrollable

Power Purchase Price for short-term

power and UI

Controllable

Power Purchase Quantum (MU)

Controllable

Intra State Transmission losses

Controllable

Quality of Supply as per Standard of

Performance unless exempted

Controllable

Non-Tariff income

Uncontrollable

8.4

Norms: Commission shall determine norms for ‘controllable’ items and where the performance of the

utilities for their respective businesses is sought to be improved upon through incentive and penalty

framework, trajectory for specific variables may be stipulated. The variations in the controllable items

over and above the specified norms will be governed by incentive and penalty framework specified in

these Regulations.

HARYANA GOVT. GAZ., NOV. 12, 2019 (KRTK. 21, 1941 SAKA)

[ PART III

418

8.5

Forecast of expected revenue from tariff: The applicant shall develop forecasting mechanism of

expected revenue from tariff and charges and submit the same along with complete supporting details,

including but not limited to the details of past performance, proposed initiatives for achieving

efficiency or productivity gains, technical studies or secondary research and contractual arrangements,

to enable the Commission to assess the reasonableness of the forecast.

9.

CAPITAL INVESTMENT PLAN

9.1

The generating company and the licensees, in respect of their respective businesses, shall file, for

approval of the Commission, a capital investment plan along with the MYT petition for a period

covering at least the entire control period. The capital investment plan shall be project/scheme wise and

for each scheme/project shall include:

(a)

Purpose of investment

(b)

Capital Structure;

(c)

Capitalization Schedule;

(d)

Financing Plan including identified sources of investment;

(e)

Details of physical parameters / targets;

(f)

Cost-benefit analysis and payback period;

(g)

Envisaged reduction in O&M cost/losses;

(h)

Ongoing projects that will spill into the year under review and new projects (along with

justification) that will commence but may be completed within or beyond the control period.

9.2

Purpose of investment shall include:

(i)

for a generation company-

generation capacity growth, replacement of assets,

renovation and modernization, reduction in average

per unit cost of generation etc;

(ii)

for a transmission licensee-

power evacuation, system augmentation, network

expansion, replacement of assets, reduction in

transmission losses, improvement in transmission

service and reliability of supply, reduction in per

MW transmission cost, integration of renewable

energy sources, congestion management, frequency

and voltage regulation, IT related projects etc.

(iii)

for a distribution licensee-

meeting load growth/ sales forecast (MUs),

distribution loss reduction, non-technical loss

reduction, replacement of assets, meeting reactive

energy

requirements,

managing peak

shifting

requirements, congestion management, frequency

and voltage regulation, improvement in metering,

consumer services, collection efficiency, quality and

reliability of supply etc.

Note: The Capital Investment by transmission licensee(s) in network expansion shall be based on load

flow studies and in accordance with the requirements of Haryana Grid Code.

9.3

The capital investment plan, in case of a generation company, will be commensurate with generation

capacity growth, renovation & modernization requirements etc.

In case of a transmission licensee, the capital investment plan will be commensurate with

load/generation capacity growth and will be linked to improvement in quality of transmission service,

reliability, metering and reduction in transmission losses.

The capital investment plan in case of a distribution licensee shall be commensurate with sales forecast

(MUs) / load growth of the state, distribution/non-technical loss reduction targets, improvements

envisaged in metering, collection efficiency, reliability and quality of supply etc.

9.4

Capital Investment for renovation and modernization in case of a transmission licensee and a generation

company shall be made through an application with a detailed project report (DPR) elaborating the

following elements: (i) Complete scope and justification; (ii) Estimated life extension of the

generation/transmission asset; (iii) Improvement in performance parameters; (iv) Cost-benefit analysis;

PART III]

HARYANA GOVT. GAZ., NOV. 12, 2019 (KRTK. 21, 1941 SAKA)

419

(v) Phasing of expenditure; (vi) Milestones/Time lines (vii) Schedule of completion; (viii) Estimated

completion cost; (ix) Other aspects.

9.5

Capital investment plan shall incorporate list of schemes in order of priority so as to enable the

Commission to approve the schemes in that order and in case lesser amount of capital expenditure is to

be approved then the schemes of lower priority could be disapproved

9.6

The generation company and licensee shall submit all information / data required by the Commission

for approval of the capital investment plan.

9.7

In the normal course, the Commission shall not revisit the approved capital investment plan during the

control period. However, during the mid-year performance review and true-up, the Commission shall

monitor the year wise progress of the actual capital expenditure incurred by the generating company or

the licensee vis-à-vis the approved capital expenditure and in case of significant difference between the

actual expenditure viz-a-viz the approved expenditure, the Commission may true up the capital

expenditure, subject to prudence check, as a part of annual true up exercise on or without an application

to this effect by the generation company/licensee. The generating company and the licensee shall

submit the scheme-wise actual capital expenditure incurred along with the mid-year performance

review and true-up filing.

9.8

In case during the mid-year performance review, the actual cumulative capital expenditure incurred up

to the current year starting from first year of the control period, is less by more than 10% of the

approved cumulative capital expenditure, the Commission shall true-up the costs incidental to the actual

capital expenditure in the current year and remaining years of the control period.

Provided that the actual capital expenditure incurred shall be only for the schemes as per the

approved capital investment plan.

Provided that if the actual capital expenditure incurred is more than the approved capital

expenditure, the Commission shall not allow any true-up of the cost incidental to such variations.

9.9

In case the capital expenditure is required due to Force Majeure events for works which have not been

approved in the capital investment plan or for works that may have to be taken up to implement new

schemes approved by the State/Central Government, the generating company or the licensee shall

submit an application containing all relevant information along with reasons justifying emergency

nature of the proposed work seeking approval by the Commission. In the case of works or schemes,

other than those required on account of Force Majeure events, the Commission shall consider to give

approval only in those cases where the works / schemes are wholly / substantially financed by the State

/ Central Government or, in view of the Commission, shall benefit a large mass of consumers of the

State. The generating company or the licensee may take up the work prior to the approval of the

Commission only in case the delay in approval will cause undue loss and such emergency nature of the

scheme has been certified by the Board of the Directors and intimated to the Commission:

Provided that the generating company or the licensee shall submit the requisite details, as

required as per Regulation 9.1 above, within 10 days of the submission of the application for approval

of emergency work;

Provided further that for the purpose of Regulation 9.7 and 9.8, such approved capital

expenditure shall be treated as a part of actual capital expenditure incurred by the licensee as well as the

capital expenditure approved by the Commission.

9.10

In case the capital expenditure incurred for approved schemes exceeds the amount as approved in the

capital expenditure plan, the generating company or the transmission or the distribution licensee, as the

case may be, shall file an application with the Commission at the end of control period for truing up the

expenditure incurred over and above the approved amount. After prudence check, the Commission shall

pass an appropriate order on case to case basis. The true-up application shall contain all the requisite

information and supporting documents.

Provided that any additional capital expenditure incurred on account of time over run and / or

on unapproved schemes not covered under Regulation 9.9 or unapproved changes in scope of approved

schemes shall not be allowed by the Commission unless the generating company or the licensee, as the

case may be, is able to give adequate justification for the same.

9.11

The generating company, transmission and the distribution licensees shall also provide a copy of their

respective capital investment plans to each other at the time of filing of the same with the Commission

so as to enable them to carry out planning and network augmentation / strengthening activities in a co-

ordinated manner. The generating company, transmission and the distribution licensees shall,

HARYANA GOVT. GAZ., NOV. 12, 2019 (KRTK. 21, 1941 SAKA)

[ PART III

420

immediately after approval of their respective capital investment plans by the Commission, send copies

of the same to each other. In addition to above the distribution licensee shall also provide a copy of its

approved power procurement plan to the transmission licensee.

9.12

The generating company and transmission and distribution licensees shall, in general, extend all co-

operation to each other by providing data /information required for carrying out planning and network

augmentation / strengthening activities in a co-ordinated manner.

9.13

The Commission shall approve the capital investment plan within a period of 45 days from the date of

its filing or submission of complete information, whichever is later.

9.14

For the purpose of second control period, the timeline for submission of business plan by the

generating company and the licensees shall be as specified in Regulation 75 of these Regulations.

Provided that any capitalisation done by mere book entries / presentation in the financial

statements in order to comply with any statute / rules etc. and not in accordance with the Capital

Expenditure approved under these Regulations, shall not be allowed by the Commission. In such cases,

the licensees / generating company shall be required to prepare memorandum account of any such

capitalisation done and submit the same along with ARR / Tariff petition. No RoE, depreciation interest

cost etc. shall be allowable on the same.

9.15

To enable faster adoption of Electric vehicles in the State, the Utilities i.e., HPGCL, HVPNL, DHBVN

and UHBVNL shall endeavour to set up Public Charging Station (PCS) for charging Electric Vehicles

near to their Sub-Stations or any other appropriate place.

10.

BUSINESS PLAN

10.1

The generating company and the licensee, in respect of their respective businesses, shall file for

approval of the Commission a business plan for a period covering the entire control period along with

the MYT petition. The business plan shall provide the details for each year of the control period.

10.2

The business plan for a generating company shall be based on planned generation capacity growth and

shall contain among other things the following (i) generation forecasts; (ii) future performance targets;

(iii) proposed efficiency improvement measures; (iv) saving in operating costs; (v) Plan for reduction in

per unit/per MW cost of generation (vi) financial statements (which include balance sheet, profit and

loss statement and cash flow statement) - current and projected (at least for the control period duration)

along with basis of projections; (vii) any other new measure to be initiated by the Generating Company

e.g. IT initiatives, third party energy audit etc.

10.3

The business plan for transmission licensee shall be based on proposed generation capacity addition and

future load forecasts of the state and should contain among other things the following: (i) future plans/

performance targets of the company including efficiency improvement measures proposed to be

introduced (ii) plans for meeting reactive power requirements; (iii) plan for reduction in transmission

losses; (iv) plan for improvement in quality of transmission service and reliability; (v) metering

arrangements; (vi) Plan for reduction in per MW transmission cost, (vii) financial statements (which

include balance sheet, profit and loss statement and cash flow statement)- current and projected (at least

for the period of control period duration) along with basis of projections; (viii) any other new measure

to be initiated by the Licensee e.g. IT initiatives etc.

10.4

The business plan for distribution licensee shall be based on sales forecast (MUs)/load growth and

should contain among other things the following: (i) future plans/ performance targets of the company

including efficiency improvement measures proposed to be introduced (ii) plan for reduction in

distribution and non-technical losses;(iii) plan for improvement in quality of supply and reliability; (iv)

metering arrangements; (v) plan for improvement in collection efficiency (vi) plan for improvement in

consumer services/new consumer services (vii) Plan for reduction in O & M cost per MU of energy

sales (viii) MIS; (ix) scheme for third party energy audit (x) plan for improvement in metering and

billing; (xi) financial statements (which include balance sheet, profit and loss statement and cash flow

statement)- current and projected (at least for the period of control period duration) along with basis of

projections; (xii) any other new measure to be initiated by the Licensee(s) e.g. IT initiatives,

development of distribution franchisee, periodical business satisfaction surveys etc.

10.5

In case the accumulated commercial losses of a generating company or the licensees have substantially

eroded their respective paid up equity, the business plan shall also contain the proposal to progressively

reduce the accumulated commercial losses indicating various measures, including re-capitalisation,

proposed to be undertaken by the generation company/licensee to achieve turnaround of the company

within a specified period.

PART III]

HARYANA GOVT. GAZ., NOV. 12, 2019 (KRTK. 21, 1941 SAKA)

421

10.6

The generation company and the licensee shall submit all information / data as required by the

Commission for necessary approval of the business plan. The Commission shall scrutinize the business

plan taking into consideration the additional information provided by the applicant, if any.

10.7

The Commission shall approve the business plan within a period of 45 days from the date of its filing or

submission of complete information, whichever is later.

10.8 For the purpose of second control period, the timeline for submission of business plan by the

generating company and the licensees shall be as specified in Regulation 75 of these Regulations.

11.

MID-YEAR PERFORMANCE REVIEW AND TARIFF SETTING

11.1

The generating company and the licensee shall file an application for mid-year performance review,

true-up of previous year and tariff for the ensuing year not less than 120 days before the close of each

year of the control period, complete in all respects including the information in the existing formats as

per present practice, till such time new formats are finalised by the Commission.

11.2

The generating company and the licensees, within 7 (seven) days of filing of the application for mid-

year performance review and true-up, shall publish for information of the public, the contents of the

application filed with the Commission for mid-year performance review, true up of previous year and

approval of tariff for the ensuing year in an abridged form in such manner as the Commission may

direct and shall provide copies of the application and other documents filed with the Commission at a

price not exceeding normal photocopying charges. The generating company and the licensees shall also

host the application and other documents at their official websites.

11.3

The generating company and the licensee shall provide with the application for mid-year performance

review the details of actual capital expenditure and details of any statutory levies and actual operational

and cost data to enable the Commission to monitor the implementation of its order including

comparison of actual performance with the approved forecasts (and reasons for deviations). In addition

the generating company and the licensees shall also submit Annual Statement of Performance and

Accounts of their respective businesses (indicating the plant-wise cost data, and unit-wise performance

parameters in case of a generation company), a copy of latest audited accounts, analysis of detailed

reasons for losses, if any, and any other information which the Commission may require to assess the

reasons and extent of any variation in the performance from the approved forecast and the need for

tariff resetting.

11.4

In their application for performance review, true-up and tariff for ensuing year, the generating company

and the licensee shall submit information for the purpose of calculating expected expenditure and tariff

along with information on financial and operational performance for the previous year(s). The

information for the previous year should be based on audited accounts copies of which shall be supplied

along with the application. In case audited accounts for the previous year are not available, audited

accounts for the latest previous year should be filed along with unaudited accounts or provisional

accounts for all the succeeding years. The application should also include the proposal for tariff

revision, if any.

11.5

The scope of the mid-year performance review shall be a comparison of the performance of the

generation company and the licensees for the relevant financial year with the approved forecast of ARR

for their respective businesses and the performance targets specified by the Commission. Upon

completion of the mid-year performance review and truing up as per Regulation 13, the Commission

shall pass an order recording:

(a)

The revised approved ARR for such financial year including approved modifications, if any;

(b)

The approved aggregate gain or loss on account of controllable items and sharing of such gains

or losses;

(c)

Truing-up or pass through of uncontrollable items of ARR of previous year(s);

(d)

Pass through of variations in controllable items due to force majeure events, if any.

(e)

Pass through of variations in controllable items attributable to uncontrollable factors.

(f)

Tariff applicable for the ensuing year.

11.6

“The Commission shall review/consider, during the control period, the application made under this

Regulation as also the application for truing up of the ARR of the previous year, as per provision of the

Regulation 13, on the same principles as approved in the MYT order on the original application for

determination of ARR and tariff. The review / true–up for FY 2018-19 and FY 2019-20 shall, however,

be done on the same principles as approved in the tariff order for FY 2018-19 and for FY 2019-20.

HARYANA GOVT. GAZ., NOV. 12, 2019 (KRTK. 21, 1941 SAKA)

[ PART III

422

Upon completion of such review/truing up, either approve the proposed modification with such changes

as it deems appropriate, or reject the application for the reasons to be recorded in writing. The

Commission shall afford opportunity of being heard to the affected party in case it considers rejecting

the application.”

12.

INCENTIVE AND PENALTY FRAMEWORK (Sharing of gains & losses)

12.1

Various elements of the ARR of the generating company and the licensee will be subject to incentive

and penalty framework as per the terms specified in this Regulation. The overall aim is to incentivize

better performance and penalize poor performance, with the base level as per the norms / benchmarks

specified by the Commission.

12.2

The elements of ARR of generating company and licensees to which incentive and penalty framework

shall apply are as follows:

(a) Common for generating company and licensees

(i)

Operation & maintenance expenses-Applicable when the actual expenses fall below or

exceed the level specified by the Commission.

(ii)

Interest on new long-term loans- Applicable when interest rate falls below or exceeds

the level specified by the Commission.

(iii)

Restructuring of capital cost - Applicable when there is a benefit from restructuring of

capital cost.

(iv)

Interest on working capital- Applicable when interest rate falls below or exceeds the

level specified by the Commission

(vi)

Restructuring of loan portfolio- Applicable when there is a net benefit from

restructuring of loan portfolio

(b) Only for generation Company

(i)

Plant Availability Factor (PAF)- Applicable when actual PAF falls below or exceeds

the level specified by the Commission

(ii) Station heat rate (SHR)- Applicable when actual SHR falls below or exceeds the level

specified by the Commission

(iii)

Auxiliary Energy Consumption (AUX)- Applicable when actual AUX falls below or

exceeds the level specified by the Commission

(iv)

Specific Fuel Oil Consumption (SFC)- Applicable when actual SFC falls below or

exceeds the level specified by the Commission

(v) Transit loss of coal- Applicable when actual transit loss falls below or exceeds the level

specified by the Commission

Note: Until the Intra-State ABT Regulations are notified by the Commission, plant availability

factor for the generating company shall mean plant load factor

(c)

Only for Transmission Licensee

(i)

Availability- Applicable when actual availability falls below or exceeds the level

specified by the Commission. The incentive for actual availability above target

availability shall be worked out as per the following formula:

I = ATC X (AA – TA) / TA

Where

I = Incentive

ATC = Annual transmission charges

AA = Annual availability achieved (actual)

TA = Normative target availability.

Note 1: The incentive mechanism for availability shall be applicable only when the

transmission licensee submits detailed computation of the availability figures to the

Commission and the Commission approves the same. The detailed computation will

include all details of the input data, methods of recording the data (manual or through

PART III]

HARYANA GOVT. GAZ., NOV. 12, 2019 (KRTK. 21, 1941 SAKA)

423

electronic modes), formula used for computation and all other details required to

establish the current level of availability.

While reporting the level of availability to the Commission, the transmission licensee

shall enclose a certificate from the SLDC validating the indicated level of availability.

Note 2: For all purposes the ‘normative target availability factor’ shall be considered for

recovery of fixed charges. Any fall in the actual availability from the normative target

availability shall result in pro-rata reduction of fixed charges.

(d) Only for Distribution Licensee

(i)

Distribution losses - Applicable when actual distribution losses fall below or exceed the

level specified by the Commission

(ii)

Collection efficiency- Applicable when actual collection efficiency falls below or

exceeds the level specified by the Commission

(iii) Recovery of arrears - Applicable when actual recovery of arrears of previous years falls

below or exceeds the targets specified by the Commission

12.3

The gains / losses shall be computed item wise separately for each business. The computations shall be

based on the data submitted by the generating company and the licensees in the application for mid-

year performance review / true – up and audited annual accounts corresponding to the financial year.

12.4

In case of gain

The item wise gain shall be shared between the generating company or the licensee, as the case may be,

and their respective beneficiaries in the ratio of 50:50. However, the sharing ratio of 50:50 may be

revised to a maximum of 60:40 at the time of true-up during mid-year performance review / true-up.

The manner of utilization of the additional 10% gain shall be specified by the Commission from time to

time.

12.5 In case of loss

12.5.1 The item wise losses on account of controllable factors in case of a distribution licensee shall be

dealt with in the following manner:

(a)

The loss to the Distribution Licensee on account of Distribution losses, as may be

admitted by the Commission after prudence check, shall be dealt with as under:

(i)

One-third of the amount of such loss may be passed on as an additional charge in

tariff over such period as may be specified in the Order of the Commission; and

(ii)

The balance amount of loss shall be absorbed by the Distribution Licensee.

(b)

The item wise losses on account of other controllable factors, unless otherwise

specifically provided by the Commission, shall be borne by the distribution licensee.

12.5.2 The item wise losses on account of controllable factors in case of a generation

company/transmission licensee, unless otherwise specifically provided by the Commission, shall

be borne by the generation company/ transmission licensee.

13. TRUING-UP

13.1

Truing-up of the ARR of the previous year shall be carried out along with mid-year performance review

of each year of the control period only when the audited accounts in respect of the year(s) under

consideration is submitted along with the application. In case audited accounts pertaining to the year, of

which truing-up is to be undertaken, are not available, the generating company or the licensee as the

case may be, shall submit the provisional account duly approved by the Board of Directors of the

company/licensee.

13.2

Truing-up of uncontrollable items shall be carried out at the end of each year of the control period

through tariff resetting for the ensuing year and for controllable items shall be done only on account of

force majeure conditions and for variations attributable to uncontrollable factors.

13.3

The Commission shall allow carrying costs for the trued–up amount (positive or negative) at the

interest rates specified in these Regulations by adjusting the interest allowed on the working

capital requirement for the relevant year of the control period.

Upon completion of the mid-year performance review and truing up in accordance with these

regulations, the Commission shall pass an order recording:

(a)

The revised ARR for such financial year including approved modifications, if any;

HARYANA GOVT. GAZ., NOV. 12, 2019 (KRTK. 21, 1941 SAKA)

[ PART III

424

(b)

Holding cost for under/over recovered amount from the close of the relevant year and upto

the middle of the ensuing year of the control period whereupon the trued-up amount has been

adjusted by appropriate resetting of tariff in accordance with regulation 13.4, calculated as

additional borrowing for working capital for that period.

Provided that no carrying cost shall be allowed on account of delay in filing for true-up due

to unavailability of the audited accounts.

13.4

Over or under recoveries of trued-up amount in previous year(s) of the control period shall be allowed

to be adjusted in the ensuing year of the control period by appropriate resetting of tariff. The

unrecovered amount in the one control period shall be adjusted in the subsequent control period.

14.

REVIEW AT THE END OF THE CONTROL PERIOD

14.1

At the end of the second control period, the Commission shall review the achievement of objectives

and implementation of the principles of MYT laid down in these Regulations.

14.2

To meet the objectives of the Act, the National Electricity Policy and National Tariff Policy, the

Commission may revise the principles of MYT for the third and subsequent control periods.

14.3

The end of the second control period shall be the beginning of the third control period. The generating

company and the licensee shall follow the same procedure unless specified otherwise by the

Commission. The Commission shall analyse the performance with respect to the targets set out at the

beginning of the control period and shall determine the base values for the next control period on the

basis of actual performance achieved, expected improvement and other relevant factors.

PART III]

HARYANA GOVT. GAZ., NOV. 12, 2019 (KRTK. 21, 1941 SAKA)

425

PART III - COMPONENTS OF ARR AND TARIFF FOR GENERATION,

TRANSMISSION AND DISTRIBUTION BUSINESS

15.

COMPONENTS OF TARIFF FOR GENERATION BUSINESS

15.1

The tariff for sale of electricity from a thermal generating plant shall comprise of two parts, namely,

a.

Annual fixed charges (Capacity charges)

b.

Variable charges (Energy Charges)

15.2

Both the components will be worked out in the manner provided in these Regulations.

15.3

The fixed cost of generating plant (thermal or hydro) shall include the following elements:

(a)

Return on equity

(b)

Interest and financing charges on loan capital

(c)

Interest on working capital

(d)

Depreciation

(e)

Operation and maintenance expenses

(f)

Foreign exchange rate variation, if any

(g)

All statutory levies and taxes, if any, excluding taxes on income,

15.4

The Energy Charges (or variable charges) for a generating plant (thermal) shall comprise of primary

and secondary fuel cost.

15.5

For the hydro plants i.e. Western Yamuna Canal Hydro project, Bhudkalan and Kakroi Hydro Plants,

however, a single part tariff, based on a normative PLF and fixed cost worked out as per Regulation 34

hereinafter, may be determined by the Commission. Unless otherwise the Commission considers it

appropriate to determine the same under HERC RE Regulations in vogue.

16.

COMPONENTS OF TARIFF FOR TRANSMISSION AND SLDC BUSINESS

16.1 The following charges shall be recovered for the use of intra-state transmission system:

(a)

Transmission tariff or network usage charges, to reflect the cost of owning (Capital

Investment), servicing and maintaining the transmission assets in order to transfer bulk power to

and from different locations. The network usage charges or transmission tariff, payable by the

beneficiaries of the transmission system shall be designed to recover the Aggregate Revenue

Requirement of the transmission licensee approved by the Commission for each year of the

control period;

(b)

Reactive energy charges, to reflect the voltage related drawl of reactive energy as provided in

the Regulations hereinafter.

(c)

Short-term open access consumers shall pay the charges for usage of Transmission system

in terms Rs per kWh as specified in third proviso of regulation 50 (b).

16.2 SLDC charges, to reflect the cost of operating the State Load Dispatch Centre (SLDC) including the

cost of owning & maintaining it. These shall be levied as SLDC charges to the beneficiariesof the

services of SLDC in accordance with the provisions of theseRegulations

16.3 The ARR’s for the transmission business and SLDC business comprise of only fixed costs which shall

have the following components:

(a)

Return on equity (only for transmission business)

(b)

Interest and financing charges on Debt

(c)

Interest on working capital

(d)

Depreciation

(e)

Operation and maintenance expenses

(f)

Foreign exchange rate variation, if any

(g)

All statutory levies and taxes, if any, excluding taxes on income,

16.4

The transmission licensee, including the STU, shall submit ARRs separately for transmission business

and SLDC business and shall provide all the above information based on the segregated accounts for

its transmission business and for State Load Dispatch Centre (SLDC), a copy of which shall be

submitted to the Commission along with the application for tariff determination/review. .

HARYANA GOVT. GAZ., NOV. 12, 2019 (KRTK. 21, 1941 SAKA)

[ PART III

426

16.5

Connection charge- A consumer or a person seeking connectivity to the transmission system for Open

Access shall pay ‘connection charge’ to the transmission licensee as provided in HERC (Terms and

condition for grant of connectivity and open access for intra-State transmission and distribution system)

Regulations, 2012 as amended from time to time. Connection charges relate to cost of assets installed

solely for the use by an individual user and cost of such assets shall not be considered for determination

of transmission tariff.

17.

COMPONENTS OF TARIFF FOR DISTRIBUTION AND RETAIL SUPPLY BUSINESS

17.1

For distribution licensees, the commission shall determine (i) retail supply tariff for their retail supply

business i.e. sale of electricity to the consumers in their respective licensed areas which will be

inclusive of wheeling charges and (ii) wheeling tariff for their wheeling business which shall be for the

purpose of recovering wheeling charges from open access consumers falling in their respective licensed

areas.

17.2

The ARRs of the distribution licensee for retail supply business and wheeling business will comprise

the following elements:

ARR for Retail supply business

A - Expenses

(a) Return on equity

(b) Interest and financing charges on loan capital

(c) Interest on working capital

(d) Depreciation

(e) Operation and maintenance expenses

(f) Foreign exchange rate variation, if any

(g) All statutory levies, and taxes including taxes on

income, if any

(h) Bad and doubtful book debt allowed to be

written off

(i) Cost of power purchase

(j) Transmission charges

(k) any other expenses not mentioned above.

Total expenses – A

B - Income / receipts:

(a) Non – tariff income including revenue from

various surcharges

(b) Income from other business in accordance with

HERC Regulations, 2007 as amended from time

to time.

(c) Income from cross subsidy surcharge from open

access consumers

(d) Income from additional surcharge from open

access consumers

(e) Any grant, subvention, subsidy etc provided by

the State Government

Total Income / receipts – B

ARR for Retail supply business =

(A – B)

ARR for Wheeling business

A - Expenses

(a) Return on equity

(b) Interest and financing charges on loan

capital

(c) Interest on working capital

(d) Depreciation

(e) Operation and maintenance expenses

(f) Foreign exchange rate variation, if any

(g) All statutory levies and taxes,if any ,

excluding taxes on income,

(h) any other expenses not mentioned

above

Total expenses – A

B - Income / receipts:

(a) Non – tariff income

(b) Income from other business, to the

extent specified for wheeling tariff

Total Income / receipts – B

ARR for Wheeling business =

(A – B)

PART III]

HARYANA GOVT. GAZ., NOV. 12, 2019 (KRTK. 21, 1941 SAKA)

427

PART IV- GENERAL PRINCIPLES FOR DETERMINATION OF COMMON COMPONENTS OF ARR

AND TARIFF FOR GENERATION,

TRANSMISSION & DISTRIBUTION BUSINESS

18.

CAPITAL COST

(1)

The Capital cost as admitted by the Commission after prudence check and subject to debt-equity ratio

as per provisions of these Regulations, shall form the basis of determination of tariff for new power

projects.

Provided that where the power purchase agreement entered into between the generating

Company and the beneficiaries or transmission service agreement entered into between transmission

licensee and the long-term transmission consumer, as the case may be, provides for a ceiling of actual

expenditure, the capital expenditure shall not exceed such ceiling for determination of tariff;

Provided further that any person intending to establish, operate and maintain a generating plant

may make an application before the Commission for ‘in principle’ acceptance of the project capital cost

and financing plan before taking up a project. The petition shall contain information regarding salient

features of the project including the capacity, location, site specific features, fuel, beneficiaries, break-up

of the capital cost estimates, financial package, schedule of commissioning, reference price level,

estimated completion cost including foreign exchange components, if any, consent of beneficiary

licensees to whom the electricity is proposed to be sold etc;

Provided also that where the Commission has given ‘in principle’ acceptance to the estimates of

project capital cost and financing plan, the same shall be the guiding factor for applying prudence

check on the actual capital expenditure;

(2)

The Capital Cost of a new project shall include the following:-

(a)

the expenditure incurred or projected to be incurred up to the date of Commercial operation of

the project;

(b)

Interest during construction and financing charges, on the loans (i) being equal to 70% of the

funds deployed, in the event of the actual equity in excess of 30% of the funds deployed, by treating the

excess equity as normative loan, or (ii) being equal to the actual amount of loan in the event of the

actual equity less than 30% of the funds deployed;

(c)

Increase in cost in contract packages as approved by the Commission;

(d)

Interest during construction and incidental expenditure during construction as computed in

accordance with these Regulation.

(e)

capitalised Initial spares subject to the ceiling rates, as a percentage of the original Plant and

Machinery cost as on the cut-off date, as specified below: -

Generating

Company

1. Coal-based generating plants:

2.50%

2. Gas Turbine / Combined Cycle generating plants

4.00%

3. Hydro Generation Plants

1.50%

Transmission

licensee

1. Transmission lines

0.75%

2. Transmission substations

2.50%

3. Series compensation devices and HVDC stations

3.50%

Distribution

licensee

Distribution Business Projects

1.50%

Provided that:

(i)

where the generating station has any transmission equipment forming part of the

generation project, the ceiling norms for initial spares for such equipment shall be as per the

ceiling norms specified for transmission system under these Regulations:

(ii)

once the transmission project is commissioned, the cost of initial spares shall be restricted

on the basis of plant and machinery cost corresponding to the transmission project at the time of

truing up:

(iii)

for the purpose of computing the cost of initial spares, plant and machinery cost shall be

considered as on cut-off date excluding IDC, IEDC, Land Cost and cost of civil works. The

generator/licensee shall submit the breakup of head wise IDC & IEDC in its tariff application.

HARYANA GOVT. GAZ., NOV. 12, 2019 (KRTK. 21, 1941 SAKA)

[ PART III

428

(f)

expenditure on account of additional capitalization and de-capitalisation determined in

accordance with these Regulation;

(g)

any gain or loss on account of foreign exchange risk variation pertaining to the loan amount

availed during the construction period as approved by the Commission.

(h)

adjustment of revenue due to sale of infirm power in excess of fuel cost prior to the COD as

specified under these Regulations; and

(i)

adjustment of any revenue earned by using the assets before COD.

(3)

The capital cost in case of a new hydro generating station shall also include:

(a)

cost of approved rehabilitation and resettlement (R&R) plan of the project in conformity with

National R&R Policy and R&R package as approved; and

(b)

cost of the developer’s 10% contribution towards Rajiv Gandhi Grameen Vidyutikaran Yojana

(RGGVY) project in the affected area.

(4)

The capital cost with respect to thermal generating station, incurred or projected to be incurred on

account of the Perform, Achieve and Trade (PAT) scheme or to achieve Environmental Norms /

Statutory Norms of Government of India will be considered by the Commission on case to case basis

and shall include:

(a)

cost of plan proposed by developer in conformity with norms of PAT Scheme; and

(b)

sharing of the benefits accrued on account of PAT Scheme.

(5)

The following shall be excluded or removed from the capital cost of the existing and new project:

(a)

The assets forming part of the project, but not in use;

(b)

Decapitalisation of Asset;

(c)

In case of hydro generating station any expenditure incurred or committed to be incurred by a

project developer for getting the project site allotted by the State government by following a two-stage

transparent process of bidding; and

(d)

the proportionate cost of land which is being used for generating power from generating station

based on renewable energy:

Provided that any grant received from the Central or State Government or any statutory body or

authority for the execution of the project which does not carry any liability of repayment shall be

excluded from the Capital Cost for the purpose of computation of interest on loan, return on equity and

depreciation;

(6)

Capital cost to be allowed by the Commission for the purpose of determination of tariff for respective

businesses will be based on the capital investment plan prepared by the generating company or the

licensee, as the case may be, and approved by the Commission prior to the filing of application for

multiyear tariff by the generating company/licensees.

(7)

Restructuring of capital cost in terms of relative share of equity and loan component, subject to

provisions of Regulation 19, shall be permitted during the tariff period provided it does not affect tariff

adversely. Any benefit from such restructuring shall be subjected to incentive / penalty framework as

per Regulation 12.

(8)

The amount of any contribution made by the consumers, open access consumers and Government

subsidy towards works for connection to the distribution system or transmission system of the

distribution /transmission licensee, shall be deducted from the original cost of the project for the

purpose of calculating the amount under debt and equity under these Regulations.

18.1

Prudence Check of Capital Expenditure:

A.

Generating Company or the Transmission Licensee

Where the capital cost considered in tariff by the Commission on the basis of projected

additional capital expenditure exceeds the actual additional capital expenditure incurred on year

to year basis by more than 10%, the generating company or the transmission licensee shall

refund to the beneficiaries or the long term transmission customers as the case may be, the tariff

recovered corresponding to the additional capital expenditure not incurred, as approved by the

Commission, along with interest at 1.20 times of the bank rate as prevalent on 1st April of the

respective year.

Where the capital cost considered in tariff by the Commission on the basis of projected

additional capital expenditure falls short of the actual additional capital expenditure incurred by

PART III]

HARYANA GOVT. GAZ., NOV. 12, 2019 (KRTK. 21, 1941 SAKA)

429

more than 10% on year to year basis, the generating company or the transmission licensee shall

recover from the beneficiaries or the long term customers as the case may be, the shortfall in

tariff corresponding to difference in additional capital expenditure, as approved by the

Commission, along with interest at the bank rate as prevalent on 1st April of the respective year.

B.

Distribution Licensee

Any excess tariff recovered on account of variation in projected capitalization in the tariff order

vis-a-vis trued up capitalization by more than 10% during the year, shall be adjusted in the

Revenue Gap/Surplus of the relevant year along with interest rate at 1.20 times of the bank rate

prevalent on 1st April of respective year:

Provided that any excess tariff recovered on account of variation in projected

capitalization in the tariff order vis-a-vis trued up capitalization due to reasons beyond the

control of the Distribution Licensee i.e., delay in ‘In-principle’ approval of the schemes, road

cutting permission from the concerned agencies etc., shall be adjusted in the Revenue

Gap/Surplus of the relevant year along with interest rate equal to bank rate prevalent on 1st April

of respective year.

Any shortfall in tariff recovered on account of variation in projected capitalization in the tariff

order vis-a-vis trued up capitalization by more than 10% during the year, shall be adjusted in the

Revenue Gap/Surplus of the relevant year along with interest rate at 0.80 times of the bank rate

prevalent on 1st April of respective year.

The following principles shall be adopted for prudence check of capital cost of the existing or

new projects:

(1)

In case of the thermal generating station and the transmission system, prudence check of

capital cost may be carried out taking into consideration the benchmark norms specified/to be

specified by the Commission from time to time:

Provided that in cases where benchmark norms have not been specified, prudence check

may include scrutiny of the capital expenditure, financing plan, interest during construction,

incidental expenditure during construction for its reasonableness, use of efficient technology,

cost over-run and time over-run, competitive bidding for procurement and such other matters as

may be considered appropriate by the Commission for determination of tariff:

Provided further that in cases where benchmark norms have been specified, the

generating company shall submit the reasons for exceeding the capital cost from benchmark

norms to the satisfaction of the Commission for allowing cost above benchmark norms.

(2)

The Commission may issue new guidelines or at its discretion, get the capital cost of any

project, vetted by an independent agency or an external expert. However, the same shall be

considered as guiding factor only and not binding on the Commission as such.

(3)

The Commission may issue new guidelines or revise the existing guidelines for scrutiny

and approval of commissioning schedule of the hydro-electric projects in accordance with the

tariff policy issued by the Central Government under section 3 of the Act from time to time

which shall be considered for prudence check.

(4)

Where the power purchase agreement entered into between the generating company and

the beneficiaries provides for ceiling of actual capital expenditure, the Commission shall take

into consideration such ceiling for determination of tariff for prudence check of capital cost.

C.

Interest during construction (IDC), Incidental Expenditure during Construction (IEDC)

(A)

Interest during Construction (IDC)

(1)

Interest during construction shall be computed corresponding to the loan from the

date of infusion of debt fund, and after considering the prudent phasing of funds up to

SCOD.

(2)

In case of additional costs on account of IDC due to delay in achieving the SCOD,

the generating company or the licensee as the case may be, shall be required to furnish

detailed justifications with supporting documents for such delay including prudent

phasing of funds:

Provided that if the delay is not attributable to the generating company or the

licensee as the case may be, and is due to uncontrollable factors as specified in these

Regulations, IDC may be allowed after due prudence check:

HARYANA GOVT. GAZ., NOV. 12, 2019 (KRTK. 21, 1941 SAKA)

[ PART III

430

Provided further that only IDC on actual loan may be allowed beyond the SCOD

to the extent, the delay is found beyond the control of generating company , after due

prudence and considering prudent phasing of funds.

(B)

Incidental Expenditure during Construction (IEDC):

(1)

Incidental expenditure during construction shall be computed from the zero date

and after considering pre-operative expenses upto SCOD:

Provided that any revenue earned during construction period up to SCOD on

account of interest on deposits or advances, or any other receipts may be considered for

reduction in incidental expenditure during construction.

(2)

In case of additional costs on account of IEDC due to delay in achieving the

SCOD, the generating company or the transmission licensee as the case may be, shall be

required to furnish detailed justification with supporting documents for such delay

including the details of incidental expenditure during the period of delay and liquidated

damages recovered or recoverable corresponding to the delay:

Provided that if the delay is not attributable to the generating company or the

transmission licensee, as the case may be, and is due to uncontrollable factors, IEDC may

be allowed after due prudence check:

Provided further that where the delay is attributable to an agency or contractor or

supplier engaged by the generating company or the transmission licensee, the liquidated

damages recovered from such agency or contractor or supplier shall be considered for

computation of capital cost.

(3)

In case the time over-run beyond SCOD is not admissible after due prudence, the

increase of capital cost on account of cost variation corresponding to the period of time

over run may be excluded from capitalization irrespective of price variation provisions in

the contracts with supplier or contractor of the generating company.

Provided that following shall be considered as controllable and uncontrollable

factors leading to cost escalation impacting Contract Prices, IDC and IEDC of the

project:

(1)

The “controllable factors” shall include but shall not be limited to the following:

(a)

Variations in capital expenditure on account of time and/or cost over-runs

on account of land acquisition issues;

(b)

Efficiency in the implementation of the project not involving approved

change in scope of such project, change in statutory levies or force majeure

events; and

(c)

Delay in execution of the project on account of contractor, supplier or

agency of the generating company or transmission licensee.

(2)

The “uncontrollable factors” shall include but shall not be limited to the

following:

(i)

Force Majeure events; and

(ii)

Change in law.

Provided that no additional impact of time overrun or cost over-run shall be

allowed on account of non-commissioning of the generating station or associated

transmission system by SCOD, as the same should be recovered through

Implementation Agreement between the generating company and the transmission

licensee:

Provided further that if the generating station is not commissioned on the

SCOD of the associated transmission system, the generating company shall bear

the IDC [and IEDC] or transmission charges if the transmission system is declared

under commercial operation.

Provided also that if the transmission system is not commissioned on

SCOD of the generating station, the transmission licensee shall arrange the

evacuation from the generating station at its own arrangement and cost till the

associated transmission system is commissioned.

PART III]

HARYANA GOVT. GAZ., NOV. 12, 2019 (KRTK. 21, 1941 SAKA)

431

18.2

Additional capitalization

18.2.1 The Commission may consider allowing, subject to prudence check, any additional capital

expenditure incurred or projected to be incurred, after the commercial operation date of a project

and up to the cut-off date, on the following provided the same was part of the original scope of

work of the project:

(a)

Deferred liabilities without any carrying cost;

(b)

Works deferred for execution without any escalation;

(c)

Procurement of initial capital spares in the original scope of work without any escalation,

subject to ceiling specified above;

(d)

Foreign exchange rate variation;

(e)

Liabilities to meet award of arbitration provided that it is not on account of any fault of

the generation company or the licensee, as the case may be;

(f)

Liabilities on account of compliance of the order or decree of a court;

(g)

Liabilities on account of change in law:

Provided that details of the works included in the original scope of work along with

estimates of expenditure, un-discharged liabilities and works deferred for execution shall be

submitted along with the application for determination of tariff after the date of commercial

operation of the project;

18.2.2 The Commission may consider admitting, after prudence check, the capital expenditure of the

following nature actually incurred after the cut-off date:

(a)

Deferred liabilities relating to works / services within the original scope of work without

any escalation;

(b)

Liabilities to meet award of arbitration provided that it is not on account of any fault of

the generation company or the licensee, as the case may be;

(c)

Liabilities on account of compliance of the order or decree of a court;

(d)

Liabilities on account of change in law;

(e)

Any additional works / services which have become necessary for efficient and

successful operation of the project, but not included in the original project cost;

18.2.3 Impact of additional capitalization in tariff revision within the approved project cost shall be

considered by the Commission once during a particular financial year of the control period.

18.2.4 In case of a transmission licensee, any additional expenditure on items such as relays, control &

instrumentation, computer system, power line carrier communication, DC batteries, replacement

of switchyard equipment due to increase of fault level, emergency restoration system, insulators

cleaning infrastructure, replacement of damaged equipment not covered by insurance and any

other expenditure which has become necessary for successful and efficient operation of

transmission system may be admitted by the commission subject to prudence check provided

that such replacement has not been necessitated due to any fault attributable to the transmission

licensee :

Provided that any expenditure on acquiring the minor items or the assets like tools and

tackles, furniture, air conditioners, voltage stabilizers, refrigerators, coolers, fans washing

machines, heat convectors, mattresses, carpets etc. bought after the cut-off date shall not be

considered for additional capitalization for determination of tariff.

Note 1: Any expenditure admitted on account of committed liabilities within the original scope

of work and the expenditure deferred on techno-economic grounds but falling within the original

scope of work shall be serviced in the normative debt-equity specified in these Regulations;

Note 2: Any expenditure on replacement of old assets or renovation and modernization or life

extension shall be considered after excluding the entire depreciated value or value of the scrap,

whichever is higher, of the original assets from the original capital cost of the assets replaced;

Note 3: Any expenditure admitted by the Commission for determination of tariff on account of

new works not in the original scope of work shall be serviced in the normative debt-equity

specified in these Regulations.

HARYANA GOVT. GAZ., NOV. 12, 2019 (KRTK. 21, 1941 SAKA)

[ PART III

432

18.2.5 Provided also that if any expenditure has been claimed under Renovation and Modernization

(R&M), repairs and maintenance under O&M expenses and Compensation Allowance, same

expenditure cannot be claimed under this Regulation.

18.2.6 In case of de-capitalization of assets of a generating company or the transmission licensee, as the

case may be, the original cost of such asset as on the date of decapitalization shall be deducted

from the value of gross fixed asset and corresponding loan as well as equity shall be deducted

from outstanding loan and the equity respectively in the year such de-capitalization takes place,

duly taking into consideration the year in which it was capitalized.

18.2.7 The scrutiny of the project cost estimates by the Commission shall include the reasonableness of

the capital cost, financing plan, interest during construction, use of efficient technology and such

other matters for the purposes of determination of tariff.

18.3 Renovation and Modernization:

(1)

The generating company or the transmission licensee, as the case may be, for meeting the

expenditure on renovation and modernization (R&M) for the purpose of extension of life beyond the

originally recognized useful life for the purpose of tariff of the generating station or a unit thereof or the

transmission system or an element thereof, shall make an application before the Commission for

approval of the proposal with a Detailed Project Report giving complete scope, justification, cost-

benefit analysis, estimated life extension from a reference date, financial package, phasing of

expenditure, schedule of completion, reference price level, estimated completion cost including foreign

exchange component, if any, and any other information considered to be relevant by the generating

company or the transmission licensee.

(2)

Where the generating company or the transmission licensee, as the case may be, makes an

application for approval of its proposal for renovation and modernization, the approval shall be granted

after due consideration of reasonableness of the cost estimates, financing plan, schedule of completion,

interest during construction, use of efficient technology, cost-benefit analysis, and such other factors as

may be considered relevant by the Commission.

(3)

In case of gas/ liquid fuel based open/ combined cycle thermal generating station, any

expenditure which has become necessary for renovation of gas turbines/steam turbine after 25 years of

operation from its COD and an expenditure necessary due to obsolescence or non-availability of spares

for efficient operation of the stations shall be allowed:

Provided that any expenditure included in the R&M on consumables and cost of components and spares

which is generally covered in the O&M expenses during the major overhaul of gas turbine shall be

suitably deducted after due prudence from the R&M expenditure to be allowed.

(4)

Any expenditure incurred or projected to be incurred and admitted by the Commission after

prudence check based on the estimates of renovation and modernization expenditure and life extension,

and after deducting the accumulated depreciation already recovered from the original project cost, shall

form the basis for determination of tariff.

19.

DEBT EQUITY RATIO

19.1

Existing projects - In case of the existing projects declared under commercial operation prior to

1st April 2020, debt-equity ratio as allowed by the Commission for determination of tariff for the

period ending 31st March 2020 shall be considered.

19.2 New projects - For new projects commissioned or whose capacity is expanded onor after 1st April 2020:

(a)

A Normative debt-equity ratio of 70:30 shall be considered for the purpose of determination of

Tariff;

(b)

In case the actual equity employed is in excess of 30%, the amount of equity for the purpose of

tariff determination shall be limited to 30%, and the balance amount shall be considered as

normative loan;

(c)

In case the actual equity employed is less than 30%, then the actual debt-equity ratioshall be

considered;

(d)

The premium, if any, raised by the generating company or the licensee while issuing share

capital and investment of internal accruals created out of free reserve, shall also be reckoned as

paid up capital for the purpose of computing return on equity subject to the normative debt

equity ratio of 70:30, provided such premium amount and internal accruals are actually utilized

for meeting capital expenditure and form part of the approved financial package. For the

PART III]

HARYANA GOVT. GAZ., NOV. 12, 2019 (KRTK. 21, 1941 SAKA)

433

purposes of computation of return, the portion of free reserves utilized for meeting the capital

expenditure shall be considered from the date the asset created is productively deployed in the

business.

19.3 Renovation and modernization

Any approved capital expenditure incurred by the generating company or the licensee on renovation

and modernization of project (to be submitted as part of the capital investment plan) shall be

considered to be financed at normative debt-equity ratio of 70:30. If the actual equity employed is less

than 30%, then the actual debt equity ratio, subject to lower limit as per company law, shall be

considered.

Provided that:

In case of de-capitalisation or retirement or replacement of assets, the equity capital approved as mentioned

above, shall be reduced to the extent of 30% (or actual equity component based on documentary evidence, if it

is lower than 30%) of the original cost of the de-capitalised or retired or replaced asset, and the debt capital

approved as mentioned above, shall be reduced to the extent of actual debt component, based on documentary

evidence, of the original cost of the decapitalised or retired or replaced asset:

In case of Generating Station or a transmission system or distribution system, which has completed its useful

life as on or after 1.4.2020, the accumulated depreciation as on the completion of the useful life less

cumulative repayment of loan shall be utilized for reduction of the equity and depreciation admissible after the

completion of useful life and the balance depreciation, if any, shall be first adjusted against the repayment of

balance outstanding loan and thereafter shall be utilized for reduction of equity.

20.

RETURN ON EQUITY

20.1 The rate of return on equity shall be decided by the Commission keeping in view the incentives and

penalties and on the basis of overall performance subject to a ceiling of 14% provided that the ROE

shall not be less than the net amount of incentive and penalty.

20.2

Return on equity shall be allowed on equity employed in assets in use considering the following and

subject to Regulation 20.1 above:

i.

Equity employed in accordance with Regulation 19.1 and 19.2 on assets (in use) commissioned

prior to the beginning of the year; plus

ii.

50% of equity capital portion of the allowable capital cost for the assets put to use during the

year.

Provided that for the purpose of truing up, return on equity shall be allowed from the

COD on pro-rata basis based on documentary evidence provided for the assets put to

commercial operation during the year.

Provided further that assets funded by consumer contributions, capital subsidies/

Government grants shall not form part of the capital base for the purpose of calculation of

Return on Equity.

20.3

Return on equity invested in work in progress shall be allowed from the actual date of commercial

operation of the assets.

20.4

There shall be no Return on Equity for the equity component above 30%.

21. INTEREST ON LOAN CAPITAL

21.1 Existing loans

(i)

Interest on loan capital shall be computed loan-wise for existing loans arrived in a manner

specified in Regulation 19 and shall be as per the rates approved by the Commission.

(ii)

The loan outstanding as on 1st April of each financial year shall be worked out as the gross loan

in accordance with Regulation 19 by deducting the cumulative repayment as admitted by the

Commission up to 31st March of previous financial year from the gross normative loan;

(iii)

The rate of interest shall be the weighted average rate of interest on institutional loans calculated

on the basis of the actual loan portfolio at the beginning of each year applicable to the project. In

case the weighted average rate is not available, the interest rate approved by the Commission in

its earlier tariff order shall be allowed.

HARYANA GOVT. GAZ., NOV. 12, 2019 (KRTK. 21, 1941 SAKA)

[ PART III

434

Provided that if there is no actual loan for a particular year but normative loan is still

outstanding, the last available weighted average rate of interest shall be considered;

Provided further that if the generating plant/project does not have actual loan, then the

weighted average rate of interest of the generating company/licensee as a whole shall be

considered.

(iv) The interest on loan shall be calculated on the normative average loan of the year by applying

the weighted average rate of interest;

(v)

The generating company and the licensee shall from time to time review their capital structure

i.e. debt and equity and make every effort to restructure the loan portfolio as long as it results in

net savings on interest. The costs associated with such re-financing shall be borne by the

beneficiaries and the net savings (after deducting the cost of re-financing) shall be subjected to

incentive / penalty framework as mentioned in the Regulation 12 which shall be dealt with at the

time of mid-year performance review/true-up.

(vi) The changes to the loan terms and conditions shall be reflected from the date of such re-

financing and benefit passed on to the beneficiaries;

(vii) In case of any dispute relating to re-financing of loan, any of the parties may approach the

Commission with proper application along with all the relevant details. During the pendency of

any dispute, the beneficiaries shall not withhold any payment on account of orders issued by the

Commission.

(viii) In case any moratorium period on repayment of loan is availed of by the generating company or

the licensee, depreciation provided for in the tariff during the years of moratorium shall be

treated as repayment during those years and interest on loan capital shall be calculated

accordingly. Provided that the repayment for each year of the control period shall be deemed to

be equal to the depreciation allowed for the corresponding year.

21.2

New loans (on or after 1st April 2020)

(i) Rate of interest on new loans i.e. on or after 01.04.2020 shall be equal to the marginal cost of

funds-based lending rate (MCLR) of the SBI plus a maximum of 150 basis points w.r.t. 1st April

of the relevant financial year. They shall however, be required to submit due justification to the

Commission for the terms and conditions of the loans raised by them including the loan sanction

letter from the banks/ lending institutions, indicating the applicable rate of interest.

Provided that interest and finance charges on works in progress shall be excluded and

shall be considered as part of the capital cost;

Provided further that neither penal interest nor overdue interest shall be allowed for

computation of Tariff.

(ii)

Any variation above or below the allowed interest rate shall be subject to the incentive and

penalty framework specified in Regulation 12. The incentives on refinancing should be net of

costs.

(iii)

The amount of loan shall be arrived in the manner as specified in Regulation 19 and shall be

based on the approved capital investment plan.

(iv)

In case any moratorium period on repayment of loan is availed of by the generating company or

the licensee, depreciation provided for in the tariff during the years of moratorium shall be

treated as repayment during those years and interest on loan capital shall be calculated

accordingly.

21.3

The interest computation shall exclude interest on loan amount, normative or otherwise, to the extent of

capital cost funded by Consumer Contributions, Grants or Deposit Works carried out by Transmission

Licensee or Distribution Licensee or Generating Company, as the case may be.

21.4

Interest shall be allowed on the amount held as security deposit held in cash from Transmission System

Users, Distribution System Users and Retail consumers, at the Bank Rate as on 1st April of the

financial year in which the petition is filed provided it is payable by the transmission/distribution

licensee.

PART III]

HARYANA GOVT. GAZ., NOV. 12, 2019 (KRTK. 21, 1941 SAKA)

435

22.

INTEREST ON WORKING CAPITAL

22.1 Components of working capital:

For the purpose of computing working capital the components mentioned in the table below shall be

considered:

Generating company

I.

Coal-based Thermal Generating Plants:

(a)

Cost of coal for 1 month corresponding to the normative availability (same for pit

head);

(b)

Cost of secondary fuel oil for 1 month corresponding to the normative availability;

(c)

Normative O&M expenses for 1 (one) month;

(d)

Maintenance spares @ 10% of the O&M expenses;

(e)

Receivables equivalent to fixed and variables charges for 1(one) month for sale of

electricity calculated corresponding to normative availability.

II.

Open-cycle / Combined Cycle Gas Turbine Thermal Generating Plants:

(a)

Fuel cost for 1 (one) month corresponding to the normative annual plant availability

factor, duly considering mode of operation of the generating plant on gas fuel and

liquid fuel;

(b)

Liquid fuel stock for ½ month corresponding to the normative annual plant availability

factor, and in case of use of more than one liquid fuel, cost of main liquid fuel;

(c)

Maintenance spares @ 15% of normative operation and maintenance expenses;

(d)

Normative operation and maintenance expenses for one month.

(e)

Receivables equivalent to capacity charges and energy charges for 1 (one) months for

sale of electricity calculated on normative plant availability factor, duly considering

mode of operation of the generating plant on gas fuel and liquid fuel; and

III.

Hydro power plants:

(a)

Normative operation and maintenance expenses for 1 (one) month;

(b)

Maintenance spares @ 7.5% of normative operation and maintenance expenses;

(c)

Receivables equivalent to fixed cost for 2 (two) months.

Transmission licensee

(a)

Normative O&M expenses for 1 (one) month;

(b)

Maintenance spares @ 15% of the O&M expenses;

(c)

Receivables equivalent to 1 (one) month of fixed cost calculated on normative / target

availability Less amount held as security deposits from Users except security deposits held in

the form of Bank Guarantees;

Provided that at the time of truing up for any year, the working capital requirement shall be

re-calculated on the basis of the values of components of working capital approved by the

Commission in the truing up.

Distribution licensee

I.

Wheeling of electricity:

(a)

Normative O&M expenses for wheeling business for 1 (one) month;

(b)

Maintenance spares for 1 (one) month based on annual requirement considered at 1%

of GFA (wire business) at the end of the previous year;

(c)

Receivables equivalent to 1(one) month of wheeling charges.

less

Amount held as security deposits in cash from Distribution System Users :

Provided further that for the purpose of Truing-up for any year, the working capital

requirement shall be re-computed on the basis of the values of components of working capital

approved by the Commission in the Truing-up before sharing of gains and losses.

HARYANA GOVT. GAZ., NOV. 12, 2019 (KRTK. 21, 1941 SAKA)

[ PART III

436

II.

Retail supply of electricity:

(a)

Normative O&M expenses for retail supply business for 1 (one) month;

(b)

Maintenance spares for 1 (one) month based on annual requirement considered at 1%

of the GFA at the end of the previous year;

(c)

Uncollected revenue to be calculated as: Revenue billed for the relevant

year * (1 – Normative Collection efficiency);

(d)

Receivables equivalent to 1 (one) month of billing less consumers’ security / advance

consumption deposit.

Provided that for the purpose of Truing-up for any year, the working capital

requirement shall be re-computed on the basis of the values of components of working capital

approved by the Commission in the Truing-up before sharing of gains and losses;

22.2 Rate of Interest

Rate of interest on working capital shall be equal to the MCLR of the relevant financial year plus a maximum

of 150 basis points. However, while claiming any spread, the generator and the licensees shall submit loan

sanction letter from the banks/ lending institutions, indicating the applicable rate of interest.

For the purpose of truing up, the actual weighted average Rate of Interest will be considered on the normative

working capital by the Commission, subject to the ceiling margin as indicated above.

23. DEPRECIATION

For the purpose of tariff determination, the depreciation shall be calculated in the following manner: -

(a)

The value base of asset shall be the historical capital cost of the asset as admitted by the Commission.

The historical capital cost shall include additional capitalization including foreign exchange rate

variation, if any already allowed by the Commission up to 31st March of the relevant year.

(b)

The residual value of the asset shall be considered as 10% and depreciation shall be allowed up to

maximum of 90% of historical capital cost of the asset;

Provided that the salvage value for IT equipment and software shall be considered as NIL and

100% value of the assets shall be considered depreciable.

(c)

Depreciation shall be calculated annually over the useful life of the asset at the rates specified in

Appendix II up to 31st March of the 12th year from the date of commercial operation of the asset. From

1st April of 13th year from the commercial date of operation of the asset, the remaining depreciable

value if any out of the 90% of the capital cost of the asset shall be equally spread over the balance

useful life of the asset.

The deprecation rates given in Appendix-II will be applicable w.e.f. 1.04.2020 only. The depreciation,

in case of existing assets, up to 31.03.2020 shall be considered as already allowed and shall not be re–

visited. The deprecation rates as per Appendix-II for such assets shall be applicable w.e.f 1.04.2020 up

to 12th year from the date of COD.

Provided that the rate provided in Appendix II, are the upper ceiling of the rate of depreciation to be

provided up to 12th year from the date of COD and the developer shall have the option of indicating,

while seeking approval for tariff, lower rate of depreciation, subject to the aforesaid ceiling.

(d)

Land shall not be considered as a depreciable asset and cost shall be excluded from the capital cost

while computing depreciable value of asset.

(e)

Depreciation shall be chargeable from the first year of commercial operation. In case of commercial

operation of the asset for part of the financial year, then the depreciation shall be charged on pro rata

basis;

(f)

Depreciation shall not be allowed on assets (or part of assets) funded by consumer contribution

(i.e., any receipts from consumers that are not treated as revenue) and capital subsidies / grants.

Provision for replacement of such assets shall be made in the capital investment plan.

24. FOREIGN EXCHANGE RATE VARIATION

24.1

The generating company or the licensee, as the case may be, may hedge foreign exchange exposure in

respect of the interest on foreign currency loan and repayment of foreign loan acquired for the project

in part or full at their discretion to safeguard their interest against extraordinary variations in the foreign

exchange rates.

PART III]

HARYANA GOVT. GAZ., NOV. 12, 2019 (KRTK. 21, 1941 SAKA)

437

24.2

The generating company or the licensee shall recover the cost of hedging of foreign exchange rate

variation corresponding to the normative foreign debt, in the relevant year on year-to-year basis as

expense in the period in which it arises and no extra rupee liability corresponding to such foreign

exchange rate variation shall be allowed against the hedged foreign currency debt;

24.3

To the extent the generating company or the licensee is not able to hedge the foreign exchange

exposure, then to that extent, the extra rupee liability towards interest payment and loan repayment

corresponding to the normative foreign currency loan in the relevant year shall be permissible provided

it is not attributable to the generating company/licensees or their contractors.

24.4

The generating company/the licensee shall recover the cost of hedging and foreign exchange rate

variations on year to year basis as income or expense in the period in which it arises.

24.5

Any gain or loss on account of foreign exchange rate variation pertaining to the loan amount availed

during the construction period shall form part of the capital cost.

25. INCOME TAX

Income tax, if any, on the income stream of the generating company or the licensee shall not be treated as an

expense or a pass-through component in the tariff and shall be payable by the generating company or the licensees on

their own.

26. INCOME FROM OTHER BUSINESS

The generation company and the licensees may engage in any other business for optimum utilization of their

assets with prior intimation to the Commission. Such instances and transactions shall be governed in accordance with

the Treatment of Income of Other Businesses of Transmission Licensee(s) and Distribution Licensee(s), Regulations,

2007 notified by the Commission, as amended from time to time:

Provided that the licensee shall follow a reasonable basis for allocation of all joint and common costs between

the core/licensed business and the other business and shall submit the allocation statement as approved by the Board

of Directors to the Commission along with his application for determination of tariff;

Provided further that where the sum total of the direct and indirect costs of such other business exceed the

revenues from such other business or for any other reason, no amount shall be allowed to be added to the aggregate

revenue requirement of the generation company or the licensees, as the case may be, on account of such other

business.

27 A. PRIOR PERIOD EXPENSES

27.1

The utility may submit to the Commission the prior period expenses as a part of the filing for truing up;

27.2

The Commission may allow prior period expenses for uncontrollable cost items only as per the audited

accounts during truing up.

HARYANA GOVT. GAZ., NOV. 12, 2019 (KRTK. 21, 1941 SAKA)

[ PART III

438

PART V- PRINCIPLES FOR DETERMINATION OF TARIFF AND NORMS OF OPERATION FOR

GENERATION BUSINESS

28.

NORMS OF OPERATION FOR THERMAL POWER STATIONS

(1)

Normative Annual Plant Availability Factor (NAPAF)

(a)

Existing Plants

Plant Name (Units)

MYT Period

2020-21

(%)

2021-22

(%)

2022-23

(%)

2023-24

(%)

2024-25

(%)

Panipat TPS (Unit 5)

85

Panipat TPS (Unit 6)

85

85

85

85

85

Panipat TPS (Unit 7)

85

85

85

85

85

Panipat TPS(Unit 8)

85

85

85

85

85

DCR TPS, Yamuna Nagar (Unit 1)

85

85

85

85

85

DCR TPS, Yamuna Nagar (Unit 2)

85

85

85

85

85

Rajiv Gandhi TPS, Khedar (Hisar)

(Unit 1)

85

85

85

85

85

Rajiv Gandhi TPS, Khedar (Hisar)

(Unit 2)

85

85

85

85

85

(b) New Plants Commissioned on or after 1st April 2020

Description

Normative Annual Plant Availability Factor (NAPAF) in %

85

(2) Auxiliary Energy Consumption

(a)

Existing Plants

Plant Name (Units)

MYT Period

2020-21

(%)

2021-22

(%)

2022-23

(%)

2023-24

(%)

2024-25

(%)

Panipat TPS (Units 5& 6)

9

9

9

9

9

Panipat TPS(Units 7 & 8)

8.50

8.50

8.50

8.50

8.50

DCR TPS, Yamuna Nagar

(Units 1&2)

8.50

8.50

8.50

8.50

8.50

Rajiv Gandhi TPS, Khedar

(Hisar) (Unit 1&2)

6

6

6

6

6

(b) New Plants Commissioned on or after 1st April, 2020

Description

Auxiliary Energy

Consumption (%)

(i) Coal-based Generating Plants(with natural draft

cooling tower or without cooling tower)*

With Steam driven boiler feed pumps

6.00

With Electrically driven boiler feed pumps

8.50

(ii) Gas Turbine Generating Plants

Combined Cycle

2.75

Open Cycle

1.00

For Coal-based generating stations with induced draft cooling towers, the norms shall be further

increased by 0.5%.

PART III]

HARYANA GOVT. GAZ., NOV. 12, 2019 (KRTK. 21, 1941 SAKA)

439

(3) Station Heat Rate

(a) Existing Plants

Plant Name

(Units)

MYT Period

2020-21

(kCal/kWh)

2021-22

(kCal/kWh

2022-23

(kCal/kWh

2023-24

(kCal/kWh)

2024-25

(kCal/kWh)

Panipat TPS

(Units 5&6)

2550

2550

2550

2550

2550

Panipat

TPS(Units 7 &

8)

2500

2500

2500

2500

2500

DCR

TPS,

Yamuna Nagar

(Units 1&2)

2344

2344

2344

2344

2344

Rajiv

Gandhi

TPS,

Khedar

(Hisar)

(Unit

1&2)

2387

2387

2387

2387

2387

Note: Station heat rate norms for DeenBandhuChhottu Ram TPS (Unit 1 and 2) and Rajiv

Gandhi TPS (Unit 1 and 2) have been determined considering their design heat rate as 2201

kCal/kWh and 2241 kCal/kWh respectively and multiplying the same with a factor of 1.065.

(b)

New Plants Commissioned on or after 1st April, 2020

(i) Coal-based Thermal

=1.065 X Design Heat Rate (kCal/kWh)

Generating Plants

Where the Design Heat Rate of a unit means the unit heat rate guaranteed by the supplier at

conditions of 100% MCR, zero percent make up, design coal and design cooling water

temperature/back pressure:

Provided that the design heat rate shall not exceed the following maximum design unit

heat rates depending upon the pressure and temperature ratings of the units:

Steam Pressure Rating (kg/cm2)

150

170

170

247

247

SHT/RHT (degree Celsius)

535/535

537/537

537/565

537/565

565/593

Type of Boiler Feed Pump

Electrical

Driven

Turbine

Driven

Turbine

Driven

Turbine

Driven

Turbine

Driven

Maximum Turbine Cycle Heat

Rate (kCal/kWh)

1955

1950

1935

1900

1850

Minimum Boiler Efficiency

Sub-Bituminous Indian Coal

0.85

0.85

0.85

0.85

0.85

Bituminous Imported Coal

0.89

0.89

0.89

0.89

0.89

Maximum Design Unit Heat

Rate (kCal/kWh)

Sub-Bituminous Indian Coal

2300

2294

2276

2235

2176

Bituminous Imported Coal

2197

2191

2174

2135

2079

Provided further that in case pressure and temperature parameters of a unit are different from above

ratings, the maximum design unit heat rate of the nearest class shall be taken;

Provided also that where unit heat rate has not been guaranteed but turbine cycle heat rate and boiler

efficiency are guaranteed separately by the same supplier or different suppliers, the unit design heat rate shall

be arrived at by using guaranteed turbine cycle heat rate and boiler efficiency.

HARYANA GOVT. GAZ., NOV. 12, 2019 (KRTK. 21, 1941 SAKA)

[ PART III

440

Note: In respect of units where the boiler feed pumps are electrically operated, the maximum design unit heat

rate shall be 40 kCal/kWh lower than the maximum design unit heat rate specified above with turbine driven

Boiler Feed Pump.

(ii)

Gas-based / Liquid fuel based thermal generating unit(s)/ block(s)

= 1.05 X Design Heat Rate of the unit/block for natural gas and

RLNG as fuel (kCal/kWh)

= 1.071 X Design Heat Rate of the unit/block for liquid fuel (kCal/kWh)

Where the Design Heat Rate of a unit/block shall mean the guaranteed heat rate for a

unit/block at 100% MCR and at site ambient conditions, zero percent make up, design

fuel and design cooling water temperature/back pressure.

(4)

Secondary Fuel Oil Consumption (SFC)

(a)

Existing Plants

Plant Name

(Units)

MYT Period

2020-21

(ml/kWh)

2021-22

(ml/kWh)

2022-23

(ml/kWh)

2023-24

(ml/kWh)

2024-25

(ml/kWh)

Panipat TPS (Unit

5&6)

1.0

1.0

1.0

1.0

1.0

Panipat TPS(Units

7 & 8)

0.5

0.5

0.5

0.5

0.5

DCR TPS, Yamuna

Nagar (Units 1&2)

0.5

0.5

0.5

0.5

0.5

Rajiv Gandhi TPS,

Khedar

(Hisar)

(Unit 1&2)

0.5

0.5

0.5

0.5

0.5

(b)

New Plants Commissioned on or after 1st April, 2020

Type

Norms

Coal-based Thermal Generating Plants

0.5ml/kWh

(5)

Operation and maintenance expenses:

The norms for O & M expenses (in Rs. Lac per MW) for the existing plants and the plants

Commissioned on orafter 1st April 2020 shall accordingly be as under:-

Plant (Unit)

MYT Period

2020-21

2021-22

2022-23

2023-24

2024-25

Panipat TPS (Unit 5)

25.64

26.66

27.73

28.84 29.99

Panipat TPS (Unit 6)

25.64

26.66

27.73

28.84 29.99

Panipat TPS (Unit 7)

23.76

24.71

25.70

26.73 27.80

Panipat TPS (Unit 8)

23.76

24.71

25.70

26.73 27.80

DCR TPS, Yamuna Nagar (Unit 1)

21.24

22.09

22.97 23.89

24.85

DCR TPS, Yamuna Nagar (Unit 2)

21.24

22.09

22.97 23.89

24.85

Rajiv Gandhi TPS (Unit 1)

12.87

13.38

13.92 14.47

15.05

Rajiv Gandhi TPS (Unit 2)

12.87

13.38

13.92 14.47

15.05

Provided that the above norms shall be multiplied by the following factors for additional units in

respective unit sizes for the units whose COD occurs on or after 1st April, 2020 in the same plant:

PART III]

HARYANA GOVT. GAZ., NOV. 12, 2019 (KRTK. 21, 1941 SAKA)

441

MW Class

Additional Unit No.

Multiplication factor

200/210/250 MW Class

Additional 6th units

0.90

Additional 7th or more units

0.85

300/330/350 MW Class

Additional 4th and 5th Unit

0.90

Additional 6th or more units

0.85

500 MW and above Class

Additional 3rd or 4th unit

0.90

Additional 5th and above units

0.85

(i)

Open Cycle /Combined Cycle Gas Turbine Generating Plants

(Rs. Lakhs / MW)

Year

Gas Turbine/Combined Cycle Generating

Plants other than small gas turbine power

generating plants

Small Gas Turbine Power

Generating Plants

2020-21

16.24

34.38

2021-22

16.76

35.48

2022-23

17.30

36.62

2023-24

17.85

37.79

2024-25

18.42

39.00

(6)

The norms for thermal power plants other than the existing plants listed above, whose tariff

determination falls under the jurisdiction of the Commission, shall be same as for the new plants given

in the sub clause (1) to (5) above corresponding to the capacity/type of the plant.

(7)

For the generating unitsthat undergo renovation and modernization: the Commission shall specify

a separate set of norms of operation to be adopted during the renovation and modernization period and

for the subsequent period. These norms shall be specified by the Commission on case to case basis as

part of the renovation and modernization capital investment approval and shall prevail over the norms

specified in these Regulations. The generation tariff shall be determined accordingly by the

Commission for such generating units.

29.

EXPENSES ON SECONDARY FUEL OIL FOR THERMAL POWER PROJECTS

(a)

Expenses on secondary fuel oil (in Rs.) shall be computed corresponding to normative secondary fuel

oil consumption (SFC) specified in this Regulation, in accordance with the following formula:

Expenses on secondary fuel oil (in Rs.) = SFC x LPSFi x NAPAF x 24 xNDY x IC x 10

Where,

SFC

=

Normative specific fuel oil consumption in ml/kWh;

LPSFi

=

Weighted average landed price of secondary fuel in Rs. / ml considered

initially;

NAPAF

=

Normative annual plant availability factor in percentage;

NDY

=

Number of days in a Year;

IC

=

Installed capacity in MW.

(b)

Initially, the landed cost of secondary fuel oil shall be considered based on the weighted average price

of secondary fuel oil during the three preceding months and in the absence of landed costs for the three

preceding months, latest procurement price for the generating plant, before the start of the year shall be

considered.

(c)

The secondary fuel oil expenses shall be subject to fuel price adjustment at the end of each year of tariff

period as per following formula:

=

SFC x NAPAF x 24 x NDY x IC x 10 x (LPSFy – LPSFi)

Where,

LPSFy = Weighted average landed price of secondary fuel oil for the Year in Rs./ml.

HARYANA GOVT. GAZ., NOV. 12, 2019 (KRTK. 21, 1941 SAKA)

[ PART III

442

30

RECOVERY OF ANNUAL FIXED CHARGES (CAPACITY) CHARGES FOR THERMAL POWER

PROJECTS

(a)

The fixed cost of a thermal generating station shall be computed on annual basis, based on norms

specified under these Regulations. Payment of capacity charge by the beneficiaries shall be on monthly

basis in proportion to allocated / contracted capacity. The total capacity charges payable for a

generating plant shall be shared by its beneficiaries as per their respective percentage share / allocation

in the capacity of the generating plant;

(b)

A generating plant shall recover full capacity charge at the normative annual plant availability factor

specified by the Commission. Recovery of capacity charge below the level of target availability shall be

on pro-rata basis. No capacity charge shall be payable at zero availability. Total recovered fixed

charges for a Unit up to the end of a month shall not be more than the admissible approved fixed

charges for that Unit as worked out corresponding to the cumulative PLF (after including deemed

generation) up to the end of that month. For example, at the end of 3rd month, if the deemed PLF is

80% and the normative PLF is 85%, the admissible approved fixed charges would be AFC/4 (0.80/

0.85) where AFC are the approved annual fixed charges. In case cumulative PLF at the end of 3rd

month is more than the normative PLF, the admissible approved fixed charges will be AFC/4;

(c)

The capacity charge payable to a thermal generating plant (in Rs.) for a calendar month shall be

calculated in accordance with the following formula: -

CC1= (AFC/12)( PAF1 / NAPAF ) subject to ceiling of (AFC/12)

CC2 =((AFC/6)( PAF2 / NAPAF ) subject to ceiling of (AFC/6)) – CC1

CC3 =((AFC/4) ( PAF3 / NAPAF ) subject to ceiling of (AFC/4)) – (CC1+CC2)

CC4 =((AFC/3) ( PAF4 / NAPAF ) subject to ceiling of (AFC/3)) – (CC1+CC2+CC3)

CC5 = ((AFC x 5/12) ( PAF5 / NAPAF ) subject to ceiling of (AFC x 5/12)) – (CC1+CC2 +CC3+CC4)

CC6 = ((AFC/2) ( PAF6 / NAPAF ) subject to ceiling of (AFC/2)) – (CC1+CC2+CC3+CC4 + CC5)

CC7= ((AFC x 7/12) ( PAF7 / NAPAF ) subject to ceiling of (AFC x 7/12)) – (CC1+CC2 +CC3 +CC4 + CC5

+ CC6)

CC8 = ((AFC x 2/3) ( PAF8 / NAPAF ) subject to ceiling of (AFC x 2/3)) – (CC1+CC2 +CC3 +CC4 + CC5 + CC6

+ CC7)

CC9 = ((AFC x 3/4) ( PAF9 / NAPAF ) subject to ceiling of (AFC x 3/4)) – (CC1+CC2 +CC3 +CC4 + CC5 + CC6

+ CC7+ CC8)

CC10=((AFC x 5/6) ( PAF10 / NAPAF ) subject to ceiling of (AFC x 5/6)) – (CC1+CC2 +CC3 +CC4 + CC5 + CC6

+ CC7 + CC8 + CC9)

CC11 = ((AFC x 11/12) ( PAF11 / NAPAF ) subject to ceiling of (AFC x 11/12)) – (CC1+CC2+CC3 +CC4 + CC5 +

CC6 + CC7 + CC8 + CC9 + CC10)

CC12 = ((AFC) ( PAFY / NAPAF ) subject to ceiling of (AFC)) – (CC1+CC2+CC3+CC4 + CC5 + CC6 + CC7 +

CC8 + CC9 + CC10 + CC11)

Provided that in case of generating station or unit thereof is under shutdown due to Renovation

and Modernization, the generating company shall be allowed to recover O&M expenses and interest on

loan only.

Where,

AFC = Annual fixed cost specified for the year, in Rupees.

NAPAF = Normative annual plant availability factor in percentage.

PAFn = Percent Plant availability factor achieved upto the end of the nth month.

PAFY = Percent Plant availability factor achieved during the Year

CC1, CC2, CC3, CC4, CC5, CC6, CC7, CC8, CC9, CC10, CC11 and CC12 are the Capacity Charges

of 1st, 2nd, 3rd, 4th, 5th, 6th, 7th, 8th, 9th, 10th, 11th and 12th months respectively.”

Note: Till Intra – State ABT is implemented, Plant Availability Factor (PAF), wherever mentioned, shall

mean Plant Load Factor (PLF). For working out annual PLF for the purpose of recovery of annual fixed

charges, deemed generation on account of backing down on the instructions of SLDC or on the request of

Discoms shall be included.

PART III]

HARYANA GOVT. GAZ., NOV. 12, 2019 (KRTK. 21, 1941 SAKA)

443

Provided that the Commission may, as an option, calculate the recovery of annual fixed

charges (Capacity) charges for thermal power points as provided below: -

The fixed cost of a thermal generating station shall be computed on annual basis based on the norms specified

under these regulations and recovered on monthly basis under capacity charge. The total capacity charge

payable for a generating station shall be shared by its beneficiaries as per their respective percentage share or

allocation in the capacity of the generating station. The capacity charge shall be recovered under two segments

of the year, i.e. High Demand Season (period of three months) and Low Demand Season (period of remaining

nine months), and within each season in two parts viz., Capacity Charge for Peak Hours of the month and

Capacity Charge for Off-Peak Hours of the month as follows:

Capacity Charge for the Year (CCy) =Sum of Capacity Charge for three months of High Demand Season

+Sum of Capacity Charge for nine months of Low Demand Season

(2) The Capacity Charge payable to a thermal generating station for a calendar month shall be calculated in

accordance with the following formulae:

Capacity Charge for the Month (CCm) =Capacity Charge for Peak Hours of the Month (CCp) +Capacity

Charge for Off-Peak Hours of the Month (CCop)

HARYANA GOVT. GAZ., NOV. 12, 2019 (KRTK. 21, 1941 SAKA)

[ PART III

444

PART III]

HARYANA GOVT. GAZ., NOV. 12, 2019 (KRTK. 21, 1941 SAKA)

445

Provided that in case of generating station or unit thereof under shutdown due to Renovation and

Modernisation, the generating company shall be allowed to recover O&M expenses and interest on loan

only.

Where,

CCm= Capacity Charge for the Month;

CCp= Capacity Charge for the Peak Hours of the Month;

CCop= Capacity Charge for the Off-Peak Hours of the Month;

CCpn= Capacity Charge for the Peak Hours of nth Month in a specificSeason;

CCopn= Capacity Charge for the Off-Peak of nth Month in a specific Season;

AFC = Annual Fixed Cost;

PAFMpn = Plant Availability Factor achieved during Peak Hours upto the end of nth Month in a

Season;

PAFMopn = Plant Availability Factor achieved during Off-Peak Hours upto the end of nth Month in a

Season;

NAPAF= Normative Annual Plant Availability Factor.

(3) Normative Plant Availability Factor for “Peak” and “Off-Peak” Hours in a month shall be

equivalent to the NAPAF specified in these Regulations. The number of hours of “Peak” and “Off-

Peak” periods during aday shall be four and twenty respectively. The hours of Peak and Off-Peak

periods during a day shall be declared by the SLDC at least a week in advance. The High Demand

Season (period of three months, consecutive or otherwise) and Low Demand Season (period of

remaining nine months, consecutive or otherwise) in a region shall be declared by the SLDC, at least

six months in advance:

Provided that SLDC, after duly considering the comments of the concerned stakeholders, shall declare

Peak Hours and High Demand Season in such a way as to coincide with the majority of the Peak Hours

and High Demand Season of the State to the maximum extent possible:

(4) Any under-recovery or over-recovery of Capacity Charge as a result of under achievement or over-

achievement, vis-à-vis the NAPAF in Peak and Off-Peak Hours of a Season (High Demand Season or

Low Demand Season, as the case may be) shall not be adjusted with under-achievement or over-

achievement, vis-à-vis the NAPAF in Peak and Off-Peak Hours of the other Season:

Provided that within a Season, the shortfall in recovery of Capacity Charge for cumulative Off-

Peak Hours derived based on NAPAF, shall be allowed to be off-set by over-achievement of PAF, if

any, and consequent notional over-recovery of Capacity Charge for cumulative Peak Hours in that

Season:

Provided further that within a Season, the shortfall in recovery of Capacity Charge for

cumulative Peak Hours derived based on NAPAF, shall not be allowed to be off-set by over-

achievement of PAF, if any, and consequent notional over-recovery of Capacity Charge for cumulative

Off-Peak Hours in that Season.

(5) The Plant Availability Factor achieved for a Month (PAFM) shall be computed in accordance with

the following formula:

Where,

AUX = Normative auxiliary energy consumption in percentage.

DCi = Average declared capacity (in ex-bus MW), for the ith day of the period i.e. the month or the

year as the case may be, as certified by the State load dispatch centre after the day is over.

IC = Installed Capacity (in MW) of the generating station

N = Number of days during the period

Note: DCi and IC shall exclude the capacity of generating units not declared under commercial

operation. In case of a change in IC during the concerned period, its average value shall be taken.

HARYANA GOVT. GAZ., NOV. 12, 2019 (KRTK. 21, 1941 SAKA)

[ PART III

446

(6) In addition to the capacity charge, an incentive shall be payable to a generating station or unit

thereof @ 65 paise/ kWh for ex-bus scheduled energy during Peak Hours and @ 50 paise/ kWh for ex-

bus scheduled energy during Off-Peak Hours corresponding to scheduled generation in excess of ex-

bus energy corresponding to Normative Annual Plant Load Factor (NAPLF) achieved on a cumulative

basis within each Season (High Demand Season or Low Demand Season, as the case may be), as

specified in these Regulations.

Provided that the generating company shall be required to file its calculations for recovery of capacity

charges as per the above two options separately for each year of the second control period.

Provided further that in case HPGCL’s power stations are backed down on the instructions of the

DISCOMs and at the same time the Discoms are drawing power at a lower rate from some other

sources i.e. generators, traders etc. or resorting to drawls under UI mechanism, the Discoms shall

compensate HPGCL to the extent of fixed cost corresponding to loss of generation due to backing

down. In such cases HPGCL shall have the right to sell power not scheduled by the Discoms to a third

party provided any revenue earned on this account shall first be adjusted against the fixed cost to be

recovered from the Discoms.

31

ENERGY CHARGES OR VARIABLE CHARGES FOR THERMAL POWER PROJECTS

(a)

The Energy charges or variable charges shall cover the main fuel cost & secondary fuel oil and shall be

payable for the total energy scheduled to be supplied to a beneficiary during the calendar month on ex-

power plant basis, at the specified variable charge rate, with fuel price adjustment.

(b)

The Energy charge for the month shall be worked out on the basis of ex-bus energy scheduled to be sent

out from the generating plant in accordance with the following formula:

Energy charge or variable charge (Rs)

= Energy Charge Rate (Rs. / kWh) x Scheduled Energy (ex-bus) for the month (kWh)

Note: Till the time intra state ABT is implemented, ‘scheduled energy’ may be read as ‘actual energy

sent’.

(c)

Energy charge rate (ECR) in Rs. per kWh on ex-power plant basis shall be determined to three decimal

places in accordance with the following formula:

(i)

In case secondary fuel Oil cost is the part of ECR:

[[{SHR-(SFCXCVSF) X LPPF}/CVPF]+(SFCXLPSF)]x{100/(100-Aux)}

(ii)

In case secondary fuel Oil cost is not the part of ECR

[{SHR-(SFCXCVSF) X LPPF}/CVPF]x{100/(100-Aux)}

Where

AUX

=

Normative auxiliary energy consumption in percentage;

CVPF

=

Gross calorific value of primary fuel as fired, in kCal per kg

or per litre as applicable;

CVSF

=

Gross calorific value of secondary fuel in kCal per ml;

ECR

=

Energy charge rate in Rs. per kWh sent out;

SHR

=

Normative Station Heat rate in kCal per kWh;

SFC

=

Normative Specific fuel oil consumption in ml/kWh

LPPF = Weighted average landed price of primary fuel in Rs./kg.

LPSF = Weighted average landed fuel cost of Secondary Fuel in Rs./ml during the month.

PART III]

HARYANA GOVT. GAZ., NOV. 12, 2019 (KRTK. 21, 1941 SAKA)

447

32

LANDED COST OF FUEL FOR THERMAL POWER PROJECTS

The landed cost of fuel for the month shall include price of fuel corresponding to the grade and quality of fuel

inclusive of royalty, taxes and duties as applicable, transportation cost by rail/road or any other means, for the

purpose of computation of energy charge and in case of coal, shall be arrived at after considering normative

transit/moisture and handling losses as percentage of the quantity of coal dispatched by the coal supply

company during the month as follows:

Non-pithead generating plants (up to 1000 KMs)

:

Upto 0.8%

Non-pithead generating plants (above 1000 KMs)

:

Upto 1.2%

Pit head generating plants

:

Upto 0.2%

33

PRIMARY FUEL PRICE ADJUSTMENT (FPA) FOR THERMAL POWER STATIONS

HPGCL shall claim FPA as per the details provided here under: -

Initially gross calorific value of coal shall be taken as per actual in the preceding financial year for which data is

available. Any deviation shall be adjusted based on the gross calorific value of coal received and burnt and

landed cost incurred by the generating company for procurement of coal on month to month basis. No separate

petition shall be required to be filed with the Commission for fuel price adjustment. In case of any dispute

related to primary fuel price adjustment, an appropriate application in accordance with Haryana Electricity

Regulatory Commission (Conduct of Business) Regulations, 2004, as amended from time to time or any

statutory re-enactment thereof, shall be made by the affected party before the Commission. For determining fuel

price adjustment (FPA) amount the following formula shall be adopted:-

Where,

FPA

=

Primary Fuel Price Adjustment in Paise/kWh;

SFCn

=

Normative Specific Fuel Oil consumption in ml. / kWh;

SHRn

=

Normative Gross Station Heat Rate in kCal / kWh;

ACn

=

Normative Auxiliary Energy Consumption in percentage;

Kos

=

Base value of GCV of fuel oil as taken for determination of base

energy charge in tariff order in kCal/ml;

Pcm

=

Weighted average price of coal as per the invoices submitted for the

month at the power station in Rs./MT;

Kcm

=

Weighted average GCV of coal fired at boiler front for the month in

KCal/Kg.;

Pcs

=

Base value of price of coal as taken for determination of base energy

charge in tariff order in Rs./MT;

Kcs

=

Base value of GCV of coal as taken for determination of base energy

charge in tariff order in KCal/Kg.

34

Technical Minimum Schedule

Technical Minimum Schedule for operation of Intra-State Coal based Generating Stations

1.

The technical minimum for operation in respect of a unit or units of an intra-State Generating Station, except

HPGCL’s power plants at Panipat, shall be 55% of MCR loading or installed capacity of the unit of at generating

station.

Provided that the above provision in the Regulation shall continue as an option available to the Commission

and shall be implemented as and when considered feasible by the Commission except for the HPGCL’s power plants of

old vintage at Panipat.

HARYANA GOVT. GAZ., NOV. 12, 2019 (KRTK. 21, 1941 SAKA)

[ PART III

448

2.

The intra-State Generator may be directed by SLDC concerned to operate its unit(s) at or above the technical

minimum but below the normative plant availability factor on account of grid security or due to the fewer schedules

given by the beneficiaries.

3.

Where the Generator, whose tariff is either determined or adopted by the Commission, is directed by the SLDC

concerned to operate below normative plant availability factor but at or above technical minimum, the said Generator

may be compensated depending on the average unit loading duly considering theforced outages, planned outages,

PLF, generation at generator terminal, energy sent out ex-bus, number of start-stop, secondary fuel oil consumption

and auxiliary energy consumption, in due consideration of actual and normative operating parameters of station heat

rate, auxiliary energy consumption and secondary fuel oil consumption etc. on monthly basis duly supported by

relevant data verified by SLDC.

Provided that:

(i)

In case of coal / lignite based generating stations, following station heat rate degradation or actual heat

rate, whichever is lower, shall be considered for the purpose of compensation: -

Sr. No.

Unit loading as a % of

Installed Capacity of the Unit

Increase in SHR

(for supercritical

units) (%)

Increase in SHR

(for sub-critical

units) (%)

1

85-100

Nil

Nil

2

75 - 84.99

1.25

2.25

3

65 - 74.99

2

4

4

55 - 64.99

3

6

(ii)

In case of coal / lignite based generating stations, the following Auxiliary Energy Consumption

degradation or actual, whichever is lower, shall be considered for the purpose of compensation:

Sr.

No.

Unit Loading (% of MCR)

% Degradation in AEC admissible

1

85 – 100

NIL

2

75 – 84.99

0.35

3

65 – 74.99

0.65

4

55 - 64.99

1.0

(iii)

Where the scheduled generation falls below the technical minimum schedule, the SLDC concerned

shall have the option to go for reserve shut down and in such cases, start-up fuel cost over and above seven (7)

start / stop in a year shall be considered as additional compensation based on following norms or actual,

whichever is lower:

Unit Size (MW)

Oil Consumption per start up (Kl)

Hot

Warm

Cold

200/210/250 MW

20

30

50

500 MW

30

50

90

660 MW

40

60

110

(iv)

In case of gas based intra-State Generating Station, compensation shall be decided based on the

characteristic curve provided by the manufacturer and after prudence check of the actual operating parameters

of Station Heat Rate, Auxiliary Energy Consumption, etc.

(v)

Compensation for the Station Heat Rate and Auxiliary Energy Consumption shall be worked out in

terms of energy charges.

PART III]

HARYANA GOVT. GAZ., NOV. 12, 2019 (KRTK. 21, 1941 SAKA)

449

(vi)

The compensation so computed shall be borne by the entity who has caused the plant to be operated at

schedule lower than corresponding to Normative Plant Availability Factor up to technical minimum based on

the compensation mechanism finalized by the SLDC.

(vii) No compensation for Heat Rate degradation and Auxiliary Energy Consumption shall be admissible if

the actual Heat Rate and / or actual Auxiliary Energy Consumption are lower than the normative Station Heat

Rate and / or normative Auxiliary Energy Consumption applicable to the unit or the generating station.

(viii) There shall be reconciliation of the compensation at the end of the financial year in due consideration of

actual weighted average operational parameters of station heat rate, auxiliary energy consumption and

secondary oil consumption.

(ix)

No compensation for Heat Rate degradation and Auxiliary Energy Consumption shall be admissible if

the actual Heat Rate and / or actual Auxiliary Energy Consumption are lower than the normative station Heat

Rate and/or normative Auxiliary Energy Consumption applicable to the unit or the generating station in a

month or after annual reconciliation at the end of the year.

4.

In case of a generating station whose tariff is neither determined nor adopted by the Commission, the

concerned generating company shall have to factor the above provisions in the PPAs entered into by it for sale of

power in order to claim compensations for operating at the technical minimum schedule. 5. The generating company

shall keep the record of the emission levels from the plant due to part load operation and submit a report for each year

to the Commission by 31st May of the year.

5.

The generating company shall keep the record of the emission levels from the plant due to part load operation

and submit a report for each year to the Commission by 31st May of the year.

6.

SLDC shall prepare a Detailed Operating Procedure in consultation with the generators and beneficiaries

within 2 months’ time and submit to the Commission for approval. The Detailed Operating Procedure shall contain

the role of different agencies, data requirements, procedure for taking the units under reserve shut down and the

methodology for identifying the generating stations or units thereof to be backed down upto the technical minimum in

specific Grid conditions such as low system demand, Regulation of Power Supply and incidence of high renewables

etc., based on merit order stacking.

7.

The SLDC shall work out a mechanism for compensation for station heat rate and auxiliary energy

consumption for low unit loading on monthly basis in terms of energy charges and compensation for secondary fuel

oil consumption over and above the norm of 0.5 ml/kWh for additional start-ups in excess of 7 start-ups, in

consultation with generators and beneficiaries including its sharing by the beneficiaries.

35

NORMS OF OPERATION AND DETERMINATION OF TARIFF FOR HYDRO POWER PLANTS

Norms of operation and determination of tariff for hydro power plants other than those covered under renewable

energy sources, shall be as under:-

34.1 The tariff for sale of electricity from a Hydro Generating Station shall comprise of two parts, namely, the

Capacity Charge and Energy Charge.

34.2 Annual Fixed Charges:

The Annual Fixed Charges shall comprise of the following elements:

(a)

Depreciation;

(b)

Interest and Finance Charges on Loan Capital;

(c)

interest on Working Capital;

(d)

Operation & Maintenance Expenses;

(e)

Return on Equity;

(0

Special allowance in lieu of Renovation &Modernization, wherever applicable;

(g)

SLDC Fees and Charges minus:

(h)

Non-Tariff lncome:

Provided that Depreciation, interest and finance charges on Loan Capital, Interest on Working Capital and

Return on Equity for Hydro Generating Stations shall be allowed in accordance with the provisions specified in these

Regulations:

HARYANA GOVT. GAZ., NOV. 12, 2019 (KRTK. 21, 1941 SAKA)

[ PART III

450

Provided further that prior period income/expenses shall be allowed by the Commission at the time of truing

up based on audited accounts, on a case to case basis,subject to prudence check.

34.3

The norms of operation for existing hydro generating stations for recovery of Annual Fixed Charges shall be

as under:-

Normative Annual Plant Availability Factor (%)

Auxiliary Consumption including Transformer

Losses (%)

80%

1

80%

1

The following Normative Annual Plant Availability Factor CNAPAF) shall apply to other hydro generating stations

for recovery of Annual Fixed Charges:

(a)

Storage and Pondage type plants with head variation between Full Reservoir Level (FRL) and Minimum Draw

Down Level (MDDL) of up to 80%, and where plant availability is not affected by silt: 90%

(b)

In case of storage and pondage type plants with head variation between full reservoir level and minimum draw

down level is more than 8% and when plant availability is not affected by silt, the month wise peaking capability as

provided by the project authorities in the DPR (approved by CEA or the State Government) shall form basis of

fixation of NAPAF.

(c)

Pondage type plants where plant availability is significantly affected by silt: 85%.

(d)

Run-of-river type plants: NAPAF to be determined plant-wise, based on l0-day design energy data, moderated

by past experience where available/relevant.

(e)

A further allowance may be made by the Commission in NAPAF determination under special circumstances,

e.g., abnormal silt problem or other operating conditions, and known plant Imitations.

The following Auxiliary Energy Consumption shall apply to other Hydro Stations

(a)

Surface hydro generating stations:

i.

With rotating exciters mounted on the generator shaft: 0.70%;

ii.

With static excitation system: 1.00%;

(b)

Underground hydro generating station:

i.

With rotating exciters mounted on the generator shaft: 0.90%;

ii.

With static excitation system: 1.20%.

34.4 Operation and Maintenance Expenses for Hydro Power Plant

(a)

The Operation and Maintenance expenses including insurance shall be derived on the basis of the average of

the actual Operation and Maintenance expenses for the three (3) years ending March 31,2018, subject to prudence

check by the Commission.

(b)

The average of such operation and maintenance expenses shall be considered as operation and maintenance

expenses for the financial year ended March 31,2020 and shall be escalated at the escalation factor of 4% to arrive at

operation and maintenance expenses for subsequent years of the control period. Alternatively, the Commission may

peg O&M expenses for the first year of operation at2% of the projectcost admitted by the Commission (excluding

cost of rehabilitation and resettlement works and any other cost that may be disallowed by the Commission including

on account of delay in CoD).

(2)

The O&M expenses for each subsequent year will be determined by escalating the base expenses determined

above, at the escalation factor of 4%.

Capacity Charge and Energy Charge for Hydro Power Plants:

The Annual Fixed Charges of a Hydro Generating Station shall be computed on annual basis, based on the norms

specified under these Regulations, and recovered on monthly basis under capacity charge (inclusive of incentive) and

Energy Charge, which shall be payable by the beneficiaries in proportion to their respective share in the capacity of

the generating station'

PART III]

HARYANA GOVT. GAZ., NOV. 12, 2019 (KRTK. 21, 1941 SAKA)

451

1.

The capacity charge (inclusive of incentive) payable to a hydro generating station for a calendar month shall

be as under:-

AFC x 0.5 x NDM /NDY x (PAFM/NAPAF) (in INR);

Where;

AFC = Annual fixed cost specified for the year, in Rupees;

NAPAF = Normative plant availability factor in percentage;

NDM = Number of days in the month;

NDY= Number of days in the year;

PAFM = Plant availability factor achieved during the month, in Percentage.

The PAFM shall be computed in accordance with the following formula:

PAFM = 10000x X ∑DCi / { N x IC x ( 100 - AUX ) } %

i= 1

AUX = Normative auxiliary energy consumption in percentage;

DCi= Declared capacity (in ex-bus MW) for the is day of the month which the stationcan deliver for at least

three (3) hours; as certified by the State Load Despatch Centre after the day is over.

IC = Installed capacity (in MW) of the complete generating station;

N = Number of days in the month.

2.

The Energy Charge shall be payable by every beneficiary for the total energy supplied to the beneficiary,

excluding free energy for home state (FEHS), if any, during the calendar month on ex-power plant basis, at the

computed Energy Charge rate.

Total Energy Charge payable to the Generating Company for a month shall be:

(Energy Charge Rate in Rs./kwh) x {Energy (ex-bus)} for the month in kWh x (100-FEHS)/100 .

3.

Energy Charge Rate (ECR) in Rupees per kWh on ex-power plant basis, for a Hydro Generating Station, shall

be determined up to three decimal places based on the following formula:

ECR =AFCx 0.5 x 10/ {DE x(100-AUX)x(100-FEHS)};

Where;

FEHS: Free energy for Home State.

DE = Annual Design Energy specified for the hydro generating station, in MWh, subject to the provision in

Regulation below.

4.

In case actual total energy generated by a Hydro Generating Station during a year is less than the Design

Energy for reasons beyond the control of the Generating Company, the following treatment shall be applied on

a rolling basis:

(i)

in case the energy shortfall occurs within ten years from the date of commercial operation of a

generating station, the ECR for the year following the year of energy shortfall shall be computed based on the

formula specified in these Regulations with the modification that the DE for the year shall be considered as

equal to the actual energy generated during the year of the shortfall, till the Energy Charge shortfall of the

previous year has been made up, after which normal ECR shall be applicable;

(ii)

in case the energy shortfall occurs after ten years from the date of commercial operation of a generating

station, the following shall apply:-

Suppose the specified annual Design Energy (DE) for the station is DE MWh, and the actual energy generated

during the relevant (first) and the following (second) financial years are Al and A2MWh, respectively, Al

being less than DE, then the Design Energy to be considered in the formula in these Regulations for

calculating the ECR for the third financial year shall be moderated as (A1 + A2 - DE) MWh, subject to a

maximum of DE MWh and a minimum of Al MWh;

HARYANA GOVT. GAZ., NOV. 12, 2019 (KRTK. 21, 1941 SAKA)

[ PART III

452

(iii)

Actual energy generated (e.g., Al, A2) shall be arrived at by multiplying the net metered energy sent

out from the station by 100 / (100 - AUX).

ln case the Energy Charge Rate (ECR) for a hydro generating station, as computed in Regulation above

exceeds ninety paise per kWh, and the actual saleable energy] in a year exceeds {DE x (100 - AUX) x (100-

FEHS)/ 10000) MWh, the Energy Charge for the energy in excess of the above shall be billed at ninety paise

per kWh only:

Provided that in a year following a year in which the total energy generated was less than the design

energy for reasons beyond the control of the Generating Company, the Energy- Charge Rate shall be reduced

to ninety paise per kWh after the energy charge shortfall of the previous year has been made up.

The State Load Dispatch Centre shall finalize the schedules for the hydro generating stations, in consultation

with the beneficiaries, for optimal utilization of all the energy declared to be available, which shall be

scheduled for all beneficiaries in proportion to their respective allocations in the generating station.

Capital Cost and Additional Capitalization

For the purpose of determination of tariff, the capital cost and additional capitalisation for Hydro Power Plants

shall be allowed/approved in accordance with the provisions outlined under Regulation 18.

35

UNSCHEDULED INTERCHANGE CHARGES

(a) As and when intra state ABT is implemented, all variations between actual net injection and scheduled

net injection for generating plant, and all variations between actual net drawl and schedule net drawl for

beneficiaries shall be treated as their respective unscheduled interchanges (UI) and will be dealt with as

per the intra-State ABT Regulations to be notified by the Commission.

(b)

The profit and loss on account of unscheduled interchange shall be to the account of the generating

company.

36

SCHEDULING

The methodology for scheduling and dispatch for the generating plant shall be as specified in the Haryana Grid

Code/IEGC and the intra state ABT Regulations to be notified by the Commission as amended from time to

time. Until the intra-State ABT Regulations are notified by the Commission CERC ABT Regulations would be

applicable.

37

SLDC AND TRANSMISSION CHARGES

(a)

SLDC and Transmission charges as determined by the Commission shall be considered as a part of

expenditure, as pass through, if payable by the generating company;

(b) SLDC and transmission charges paid for energy sold outside the state, if any, shall not be considered as

expenses for determining generation tariff.

38

REACTIVE ENERGY

A generating station shall inject/absorb the reactive energy into the grid as per the directions of State Load

Despatch Centre. Such injection/absorption may be undertaken on the basis of machine capability and in

accordance with the directions issued by SLDC as per the provisions of Haryana Grid Code as amended from

time to time.

39

DEMONSTRATION OF DECLARED CAPACITY

(i)

The generating company may be required to demonstrate the declared capacity of its generating plant as

and when asked by the State Load Dispatch Centre or as requested by DISCOMs to SLDC. In the event

of the generating company failing to demonstrate the declared capacity, the capacity charges due to the

generating plant shall be reduced as a measure of penalty as provided below;

The quantum of penalty for the first mis-declaration in a financial year for any duration or block in a

day shall be charged corresponding to two days of fixed charges. For the second mis-declaration the

penalty shall be equivalent to fixed charges for four days and for subsequent mis-declarations in the

financial year, the penalty shall be multiplied in the geometrical progression. Same process to be

followed in the subsequent financial years;

PART III]

HARYANA GOVT. GAZ., NOV. 12, 2019 (KRTK. 21, 1941 SAKA)

453

(ii)

The operating log books of the generating plant shall be available for review by the State Load

Dispatch Centre. These books shall contain record of machine operation and maintenance.

(iii)

The SLDC shall provide to the Commission any data/information in the context of demonstration of

declared capacity by a generating company or in the context of any other issue concerning system

operation/security as may be asked for by the Commission.

40

METERING AND ACCOUNTING

(i)

Metering arrangement, including installation, testing and operation and maintenance of meters and

collection, transportation and processing of data required for accounting of energy exchanges and

average frequency on 15 minutes time block basis shall be provided by the State Load Dispatch Centre

to the State Transmission Utility;

(ii)

Processed data of the meters along with data relating to declared capacities and schedules etc shall be

supplied by State Load Dispatch Centre to the State Transmission Utility;

(iii)

For all purpose, the Standards for Metering and Accounting specified in the Haryana Grid Code

Regulations 2009, intra-State ABT Regulations to be notified by the Commission and the Central

Electricity Authority (Installation and Operation of Meters) Regulations 2006 notified by the CEA,

shall be adopted and followed. Until the intra-State ABT Regulations are notified by the Commission,

CERC ABT Regulations would be applicable.

41

BILLING AND PAYMENT

(i)

Bills shall be raised for capacity charges, and energy charges on monthly basis by the generating

company in accordance with these Regulations, and applicable payments shall be made by the

beneficiaries directly to the generating company.

(ii)

Payment of the capacity charges for a thermal generating plant shall be shared by the beneficiaries of

the generating plant as per their percentage allocated share for the month (inclusive of any allocation

out of the unallocated capacity) in the installed capacity of the generating plant.

42

REBATE FOR EARLY PAYMENT

In case of early payment of bills of capacity and energy charges the following schedule of rebate shall be

followed:

Days from the date of receipt of bills of capacity charges, energy

charges etc.

Rebate %

0-7

2.0

8-14

1.0

15-21

0.5

22-30

0.25

43

LATE PAYMENT SURCHARGE

In case the payment of any bill for charges payable under these Regulations is delayed by the beneficiary

beyond a period of 30 days from the date of receipt of bill, a late payment surcharge at the rate of 0.04% per

day shall be levied by the generating company and shall be payable by the beneficiaries.

44 SALE OF INFIRM POWER

(a)

Supply of infirm power shall be accounted as Unscheduled Interchange (UI) and paid for from the

regional or State UI pool account at the applicable frequency-linked UI rate.

(b)

Any revenue earned by the generating company from sale of infirm power after accounting for the fuel

expenses shall be applied for reduction in capital cost. Any loss on this account shall not be taken into

consideration.

HARYANA GOVT. GAZ., NOV. 12, 2019 (KRTK. 21, 1941 SAKA)

[ PART III

454

45

NON-TARIFF INCOME

(a)

All incomes being incidental to electricity business and derived by the generating company from

sources, including but not limited to profit derived from disposal of assets, rents, miscellaneous receipts from

the beneficiaries, etc. shall constitute non-tariff Income of the generating company;

(b)

The amount received by the generating companyon account of non-tariff income shall be deducted from

the aggregate revenue requirement for calculating the net revenue requirement of such licensee:

Provided that the generating companyshall submit full details of his forecast of non-tariff income to the

Commission in such form as may be stipulated by the Commission from time to time;

Provided that Late Payment Surcharge and Interest on Late Payment earned by the Generating

Company shall not be considered under Non-tariff Income;

(c)

The “non-tariff income” shall include but shall not be limited to the following:

i.

Income from rent on land or buildings or other assets;

ii.

Income from sale of land or other assets;

iii.

Income from sale of scrap;

iv.

Income from statutory investments;

v.

Income from sale of Ash/rejected coal;

vi.

Interest on advances to suppliers/contractors;

vii.

Rental from staff quarters;

viii.

Rental from contractors;

ix.

Income from hire charges from contactors and others;

x.

Deferred Income from grant, subsidy, etc., as per Annual Accounts;

xi.

Income from advertisements;

xii.

Excess found on physical verification;

xiii.

Interest on investments, fixed and call deposits and bank balances;

xiv.

Prior period income, etc.:

PART III]

HARYANA GOVT. GAZ., NOV. 12, 2019 (KRTK. 21, 1941 SAKA)

455

PART VI - PRINCIPLES FOR DETERMINATION OF TARIFF AND NORMS OF OPERATION FOR

TRANSMISSION BUSINESS

45.

NORMS OF OPERATION FOR TRANSMISSION LICENSEE

The norms of operation for transmission licensee shall be as under:

45.1 Normative annual transmission system availability Factor (NATAF)

Norm

MYT Period

AC System

99.2 (%)

The above-mentioned target availability will be subject to an incentive and penalty mechanism

once the conditions specified in Regulation 12 are satisfied.

Provided also that for AC system, two trippings per year shall be allowed, and after two

trippings in a year, additional 12 hours outage shall be considered in addition to the actual outage:

Provided also that in case of outage of a transmission element affecting evacuation of power

from a generating station, outage hour shall be multiplied by a factor of 2.

45.2 Auxiliary energy consumption in the substations

The charges for auxiliary energy consumption in the AC sub-station for the purpose of air-conditioning,

lighting and consumption in other equipment shall be borne by the transmission licensee and will be

included as part of the administrative and general expenses.

45.3 Operation and maintenance expenses

The actual audited Employee cost (excluding terminal liabilities) and A&G expenses for the financial

year preceding the base year, subject to prudence check, shall be escalated at the escalation factor of

4% to arrive at the Employee cost (excluding terminal liabilities) and A&G expenses for the base year

of the control period. The O&M expenses for the nth year of the control period shall be approved based

on the formula given below:

O&Mn = (R&Mn + EMPn + A&Gn)* (1-Xn) + Terminal Liabilities

Where,

R&Mn – Repair and maintenance costs of the transmission licensee for the nth year;

EMPn – Employee costs of the transmission licensee for the nth year excluding terminal

liabilities;

A&Gn – Administrative and general costs of the transmission licensee for the nth year;

The above components shall be computed in the manner specified below:

(a)

R&Mn= K*GFA*(INDXn/ INDXn-1)

Where,

‘K’ is a constant (expressed in %) governing the relationship between R&M costs and

Gross Fixed Assets (GFA) for the nth year. The value of K will be 0.50% for the entire

control period;

GFA is the average value of gross fixed assets for the nth year;

INDXnmeans the inflation factor for the nth year as defined herein after:

(b)

EMPn (excluding terminal liabilities) +A&Gn= (EMPn-1+A&Gn-1) *(INDXn/ INDXn-1)

Where,

INDXn – Inflation Factor to be used for indexing the employee cost and A&G cost. This

will be a combination of the consumer price index (CPI) and the wholesale price index

(WPI) for immediately preceding year and shall be calculated as under:

INDXn= 0.55*CPIn +0.45*WPIn

Note: As and when any material price index specific to power sector or a more relevant Index

becomes available, the same shall replace the Index used for working out R&M cost.

Note: Source for CPI and WPI calculation as under:

Wholesale Price Index numbers as per Office of Economic Advisor of Government of India in

the previous year;

Consumer Price Index for Industrial Workers (all India) as per Labour Bureau, Government of

India in the previous year

HARYANA GOVT. GAZ., NOV. 12, 2019 (KRTK. 21, 1941 SAKA)

[ PART III

456

(c)

Xn is an efficiency factor for nth year

Xn will be calculated by the Commission by analysing the change in the total operating

expenditure i.e. expenditure before depreciation, interest and taxes (i) Per unit of circuit km over

last three years; and (ii) Per unit of transformation capacity over last three years.

The Value of Xn will be determined by the Commission in the MYT order for the control period.

The transmission licensee will be required to submit the above data based on the actual for the

last three years.

Note 1: For the purpose of estimation, the same INDXn value shall be used for all years of the

control period. However, the Commission will consider the actual values in the INDXn at the

end of each year during the mid-year performance review and true-up exercise and true-up the

employee cost and A&G expenses on account of this variation.

Note 2: Any variation in employee cost and A&G cost on account of reasons beyond variation

in INDXn will be subject to the incentive and penalty framework specified in these Regulations.

Note 3: Terminal liabilities will be approved as per actual expenditure incurred by the

transmission licensee or as established through actuarial valuation.

Note 4:O&M expenses made on account of extraordinary situations, if any, shall be submitted to

Commission for its approval. Such expenses shall be filed separately and will not be subjected to

incentive and penalty framework. The approved amount by the Commission shall be trued up in

the mid-year performance review and true-up.

Note 5: Changes in the pay scales of employees necessitated on account of pay revision by Pay

Commission or by the State Government orders shall be considered by the Commission for true-

up during the mid-year performance review and true-up.

45.4

Transmission losses (%)

The trajectory for, intra-state transmission loss, during the control period shall be as under:

FY 2020-21

FY 2021-22

FY 2022-23

FY 2023-24

FY 2024-25

2.15

2.10

2.05

2.02

2.0

(a)

The losses shall be borne by the beneficiaries in kind. The SLDC shall reduce the demand

scheduled by the beneficiaries during each time block by the 12 months rolling transmission

losses (the said period will be the 12 months period proceeding the relevant month by 3 months).

The SLDC shall post the rolling 12 months losses regularly on its website. The SLDC, however,

shall develop necessary software for working out rolling 52-week losses and reduce the

scheduled demand accordingly thereafter.

(b)

If the actual annual transmission losses (%) exceed the benchmark value (%) approved by the

Commission, the licensee(s) shall be penalized in the following manner:

Percentage increase above the Loss

level specified by the Commission

Penalty

Upto 5%

No Penalty

More than 5% and upto 10%

Reduction in return on equity in Rs crore by 0.5 %

More than 10% and upto 15%

Reduction in return on equity in Rs crore by 1 %

More than 15%

Reduction in return on equity in Rs Crore by 1% + 0.5%

for every increase of 5% or part thereof above 15%

Example: In case the specified transmission loss level is 3%, then an increase of 0.15 in the loss level

will amount to 5% increase. Similarly, an increase of 0.30 and 0.45 in the loss level will amount to 10%

and 15% increase in the loss level respectively.

Provided, further that the intra-State transmission loss, in excess of the benchmark specified in

these Regulations shall not be passed on to the beneficiaries / electricity consumers.

PART III]

HARYANA GOVT. GAZ., NOV. 12, 2019 (KRTK. 21, 1941 SAKA)

457

46

NON-TARIFF INCOME

(a)

All incomes being incidental to electricity business and derived by the licensee from sources, including

but not limited to profit derived from disposal of assets, rents, miscellaneous receipts from the beneficiaries,

etc. shall constitute non-tariff Income of the licensee;

(b)

The amount received by the licensee on account of non-tariff income shall be deducted from the

aggregate revenue requirement for calculating the net revenue requirement of such licensee:

Provided that the transmission licensee shall submit full details of his forecast of non-tariff income to

the Commission in such form as may be stipulated by the Commission from time to time;

Provided that Late Payment Surcharge and Interest on Late Payment earned by the the Licensee shall

not be considered under Non-tariff Income;

(c)

The “non-tariff income” shall include but shall not be limited to the following:

i.

Income from rent on land or buildings or other assets;

ii.

Income from sale of land or other assets;

iii.

Income from sale of scrap;

iv.

Income from statutory investments;

v.

Income from interest on contingency reserve investment;

vi.

Interest on advances to suppliers/contractors;

vii.

Rental from staff quarters;

viii.

Rental from contractors;

ix.

Income from hire charges from contactors and others;

x.

Income from advertisements, etc.;

xi.

Miscellaneous receipts like parallel operation charges;

xii.

Deferred Income from grant, subsidy, etc., as per Annual Accounts;

xiii.

Excess found on physical verification;

xiv.

Interest on investments, fixed and call deposits and bank balances;

xv.

Prior period income, etc.

47 INCOME FROM SHORT TERM OPEN ACCESS CONSUMERS

(a)

The charges payable by the short-term open access consumers shall be as specified in the intra-State

open access Regulations notified by the Commission and as amended from time to time;

‘(b)

Intra State Transmission Charges and SLDC charges applicable to short term open access consumers

shall not be applicable on short term power purchase/sale by the long-term and medium-term beneficiaries of

the transmission licensee;

(c)

25% of the charges collected from the short-term open access consumers on account of application

money and transmission charges shall be retained by the transmission licensee and the balance 75% shall be

considered as non-tariff income and adjusted towards reduction in the transmission charges payable by the

long term and medium-term users.

48

REACTIVE ENERGY CHARGES

(a)

The reactive energy charges shall be as provided in the Haryana Grid Code as amended from time to

time.

HARYANA GOVT. GAZ., NOV. 12, 2019 (KRTK. 21, 1941 SAKA)

[ PART III

458

(b)

Reactive energy charge shall be payable and shared as per Regulation 5.5.1 of Haryana Grid Code

(HGC) Regulation, 2009 as amended from time to time;

(c)

Reactive energy account shall be maintained and operated as per the intra-State ABT Regulations to be

notified by the Commission and as amended from time to time. Until the intra-State ABT Regulations

are notified by the Commission, CERC ABT Regulations shall be applicable;

(d)

The reactive energy charges from embedded open access consumers shall be recovered by the

distribution licensee by apportioning the total reactive energy drawn during the month in the ratio of

energy drawn through open access and the energy drawn from the distribution licensee. The reactive

energy charges shall be recovered for the apportioned reactive energy corresponding to energy drawn

through open access at the applicable rate.

49

ANNUAL TRANSMISSION CHARGES

(a)

The total annual transmission charges of a transmission licensee shall be equal to total annual expenses

and return on equity as allowed as per these Regulations less non-tariff income and 50% of the revenue

generated from other business in line with HERC Regulations, 2007 for other income as amended from

time to time;

(b)

The transmission licensee shall be entitled to recover its annual transmission charges (ATC) from the

beneficiaries.

50

RECOVERY OF ANNUAL TRANSMISSION CHARGES

(a)

Transmission licensee shall recover the transmission charges at the normative annual transmission

system availability factor specified for it by the Commission.

(b)

Payment of transmission charges

Annual transmission charges shall be fully recoverable at the specified level of target availability.

Payment of transmission charges below the specified target availability shall be on pro-rata basis. The

transmission licensee may recover its annual transmission charges by way of a fixed charge based on

transformation capacity. The transmission charges shall be calculated on a monthly basis. In case of

more than one beneficiaries of the transmission system, including the distribution licensees and long

term and medium term open access consumers (but subject to any exclusion of any other open access

consumers as per the open access Regulation notified by the Commission), the monthly transmission

charges leviable on each beneficiary shall be computed as per the following formula.

ATC CA

Monthly Transmission Charges =

--------- x --------

12

CS

Where,

ATC = Annual Transmission Charges payable by all the beneficiaries after deducting any benefits to

be considered as decided by the Commission;

CA = Transformation Capacity (MVA) allocated to each beneficiary.

CS = Sum of Transformation Capacity (MVA)allocated to all beneficiaries.

Note: Where allocated Transformation Capacity (MVA) of a beneficiary is not available, the contracted

capacity in MW shall be converted in MVA at a power factor of 0.90 andthe same shall be considered

for computation of monthly transmission charges payable by the beneficiaries.

Provided that monthly Transmission tariff shall also be shared by a Generation Company

(including Renewable Energy Generators which opt for third party sale) if power from such Generating

Company is sold to a consumer outside the State of Haryana to the extent of capacity contracted outside

the state.

Provided further that the Long Term and Medium-Term beneficiaries of the Transmission

System shall pay no other charges for the use of Transmission Network of STU.

Provided also that the transmission charges shall be payable by the short-term open access

consumers for the scheduled energy drawl at per kWh rate as worked out by dividing the annual

transmission charges by the total volume of energy transmitted by the transmission licensee during the

previous year. Provided further that Intra-State charges payable by the Open Access Consumers shall

not be applicable on short term Open Access power purchase / sales by the Distribution Licensee.

PART III]

HARYANA GOVT. GAZ., NOV. 12, 2019 (KRTK. 21, 1941 SAKA)

459

51.

SHARING OF CHARGES FOR INTRA-STATE TRANSMISSION NETWORK IN CASE OF

MULTIPLE TRANSMISSION LICENSEES

51.1 Determination of Monthly Transmission Tariff (MTT)

51.1.1The aggregate of the yearly revenue requirement for all Transmission Licensees, less the

deductions, as approved by the Commission for a financial year, shall form the “Total

Transmission Cost” (TTC) of the Intra State transmission system, to be recovered from the

Long-term and Medium term Transmission System Users (TSUs) for that financial year, in

accordance with the following formula:

n

TTC= ∑ (ARRi- NTi- Oi) – STR

i=1

Where,

TTC = Total Transmission Cost for the financial year

n = Number of Transmission Licensee(s)

ARRi= Aggregate Revenue Requirement approved by the Commission for ith Transmission Licensee

for the financial year

NTi= Approved level of non-tariff income for ith Transmission Licensee for the financial year

Oi = Approved level of income from other business of the ith Transmission Licensee for the financial

year

STR = Revenue from short-term open access charges recovered and not allowed to be retained during

previous financial year.

Provided that the revenue from short-term open access charges for each year of Control

Period shall be taken to be same as that prevalent during the base year. However, the

adjustments due to variation in actual revenue from short-term open access charges shall be

undertaken during annual truing up:

Provided further that ARR of the Transmission Licensee, in case of transmission projects

selected through competitive bidding, shall be the Transmission Service Charge (TSC) for

relevant year as per the Transmission Service Agreement (TSA) approved and adopted by the

Commission in accordance with Section 63 of the Act.

51.1.2 The Total Transmission Cost (TTC) as determined by the Commission as per Regulation 51.1.1

above, shall be shared by all long-term and medium-term open access consumers on monthly

basis (including existing Distribution Licensees) in the same manner as provided for in

Regulation 50 for sharing of annual transmission charges.

52

RECOVERY OF CHARGES BY SLDC FROM BENEFICIARIES

“The annual charges of SLDC determined as per Regulations 6 and 16, shall be recovered as a single composite

charge from the beneficiaries as under:

(1) Intra-State transmission licensee

8% of Annual SLDC Charges

(2) Generating stations and sellers

46% of Annual SLDC Charges

(3) Distribution licensee and buyers

46% of Annual SLDC Charges

(i) The SLDC charges shall be levied by the Transmission licensees / STU, also designated as the SLDC, on the basis

of weighted average of the lines (Ckt. km) owned by the Intra State Transmission Licensee(s) as on the last day of the

month prior to billing of the month.

Ckt. Km 400 kV MF 4 product

Ckt. Km 220 kV MF 2.2 product

Ckt. Km 132kV MF 1.32 product

Ckt. Km 66 kV MF 0.66 product

_________

Total __XXX___

HARYANA GOVT. GAZ., NOV. 12, 2019 (KRTK. 21, 1941 SAKA)

[ PART III

460

Therefore, the SLDC charges for transmission licensee

= 8% x (annual SLDC charges X weighted Ckt Km of concerned transmission licensee) / total weightedCkt. Km of

all transmission licensees.

(ii)

The SLDC charges from the generating companies and sellers (which Exclude short term open access

consumers) shall be collected in proportion to their installed capacity /contracted capacity as on the last day of the

month prior to billing of the month.

(iii)

The SLDC charges from distribution licensees and buyers (which exclude short term open access consumers)

shall be collected in proportion to the sum of their allocated transmission capacity in MVA as on the last day of the

month prior to billing of the month.

(iv)

SLDC charges shall be collected on monthly basis.

(v)

Any deviation in the value of annual SLDC charges determined and collected from the beneficiaries shall be

trued up during the mid-year performance review and true-up.

(vi)

For the purpose of recovery of SLDC charges from the entity which has entered into a long term open access /

Medium Term open access agreement with STU, shall be considered under the category in wunhich it has

applied/signed the Long Term/Medium Term Open Access agreement i.e. generator/supplier or distribution

licensee/buyer”.

53 RECOVERY OF SLDC CHARGES FROM SHORT TERM OPEN ACCESS CONSUMERS

The short-term open access consumers shall pay composite SLDC charges as provided in HERC (Terms and

conditions for grant of connectivity and open access for intra–State transmission and distribution system),

Regulations, 2012 as amended from time to time. The total receipt of SLDC charges from short term open access

consumers shall be utilised to reduce the SLDC charges payable by the beneficiaries.

54.

BILLING AND PAYMENT OF CHARGES

54.1

The State Transmission Utility shall raise bills for SLDC and transmission charges payable by the

beneficiaries on a monthly basis. The STU shall raise bills for UI charges on weekly basis as and when

intra state ABT is implemented. UI accounting procedures shall be governed by intra-state ABT

Regulations to be notified by the Commission as amended from time to time.

54.2

Rebate for early payment

In case of early payment of bills of transmission and other charges the rebate as under shall be

admissible:

Days from the date of receipt of bills of transmission charges

Rebate (%)

0-7

2

8-14

1

15-21

0.5

22-30

0.25

54.3 Late payment surcharge

In case the payment of bills of transmission and other charges by the beneficiary is delayed beyond a

period of 30 days from the date of receipt of bill, a late payment surcharge of 0.04% per day shall be

payable by the beneficiary.

55. Quality of Supply

The Commission shall monitor the following Quality of Transmission parameters during the Control Period.

(a)

Transmission System Availability

(b)

Transformer Failure across various capacities which represents the number of transformer failures as a

percentage of the total number of transformers in that specified capacity within the Transmission System over

a specified period of time.

(c)

System Reliability

The Transmission Licensee in its Business Plan filings shall submit and propose the trajectory for the

achievement of quality targets including reduction in the frequency of interruptions. The Commission shall

specify the targets for each parameter. The Transmission Licensee shall submit its performance on each

parameter in the form and manner specified by the Commission. In the case of frequency of interruptions

being high the same will have bearing on the level of incentive allowed for availability.

PART III]

HARYANA GOVT. GAZ., NOV. 12, 2019 (KRTK. 21, 1941 SAKA)

461

The Transmission Licensee shall achieve redundancy in their system and move towards N-1 criteria for their

system planning. Also, Transmission Licensee shall focus in setting up 220/33 kV S/s for ultimate usage of the

end consumer and shall avoid setting up new 132kV S/s or such voltage levels S/s whose consumers are not in

place.

56.

Safety Standards

The Transmission Licensee shall develop a Safety Manual and follow procedure to maintain the safety

standards during construction, operation, etc. in line with the provisions of CEA (Measures relating to Safety

and Electric Supply) Regulations, 2010 as amended from time to time.

HARYANA GOVT. GAZ., NOV. 12, 2019 (KRTK. 21, 1941 SAKA)

[ PART III

462

PART VII - PRINCIPLES FOR DETERMINATION OF TARIFF AND NORMS OF OPERATION FOR

DISTRIBUTION BUSINESS

57. NORMS OF OPERATION FOR DISTRIBUTION LICENSEE

The norms of operation for distribution licensee shall be as under:

57.1 Distribution loss

(a)

The distribution loss shall be equal to the difference between the energy injected into the

distribution system (X) and the sum of energy sold to all its consumers (Y);

(b)

Energy sold shall be the sum of metered sales and assessed unmetered sales, if any, based on

approved methodology/ norms. The percentage distribution loss shall be as follows:

Percentage distribution loss = ((X- Y)/X) x100

(c)

The distribution licensee shall file the loss trajectory in the business plan commensurate with the

capital investment plan. The Commission after verification and evaluation of the same shall

approve the loss trajectory for each year of the control period;

(d)

The distribution loss level will be linked to a normative load factor for unmetered agriculture

consumers. The distribution licensee shall establish consumption of unmetered agriculture

consumers through a representative and reliable energy audit/sample tube well metering/sample

DT metering/ meter readings of the 11 kV segregated AP feeders and submit requisite data for

consideration of the Commission.

Provided that the Distribution loss trajectory for the control period shall be decided by

the Commission in the MYT Order, considering the past performance data, estimate of

distribution losses for each year of the control period submitted by the Distribution Licensees in

their MYT Petition, industry bench marks/norms and after consideration of other relevant

factors considered appropriate by the Commission. The distribution licensee shall submit

appropriate feeder wise losses data along with its plans to bring the same within the industry

benchmark and accordingly calculate and submit the loss reduction trajectory along with the

MYT petition for the first year of the second control period.

(e)

In the absence of requisite data in respect of such energy audit / sample surveys / sample DT

metering/ meter readings of segregated 11kV AP feeders, the Commission shall not accept the

claim of the distribution licensee and may proceed to fix the loss levels and the load factor for

unmetered agriculture consumption on the basis of the information available with it; The

distribution licensee shall furnish within a period of six months from the date of notification of

these Regulations, computation of supply voltage - wise and consumer category wise

distribution and AT&C losses;

(f)

Any overachievement and underachievement of the loss trajectory shall be subject to incentive

and penalty framework specified in Regulation 12. The distribution licensee(s) shall provide a

statement to this effect in the mid-year performance review and true-up.

Provided that the financial impact on account of over or under achievement of

Distribution Loss target shall be computed as under:

where,

Q1 = Actual quantum of Energy purchased at Distribution periphery in MU;

L1 = Distribution Loss Target in %;

P = Trued up Average Power Purchase Cost (APPC) per unit at Distribution periphery in

Rs./kWh;

Q2 = Actual quantum of Energy Billed in MU.

PART III]

HARYANA GOVT. GAZ., NOV. 12, 2019 (KRTK. 21, 1941 SAKA)

463

57.2

Collection Efficiency

The norms for Collection Efficiency for the distribution licensee(s) shall be 99.50% for every year of

this Control Period.

Besides the Collection Efficiency, the Commission shall also monitor the recovery of arrears of

previous years for which the Commission shall prescribe the targets and shall accordingly assess the

performance of the licensee with regard to recovery of arrears.

Any over achievement or under achievement in respect of Collection Efficiency and recovery of arrears

shall be subject to incentive and penalty framework as specified in Regulation 12.

57.3

AT&C Losses

The Distribution Licensee shall file AT&C Loss trajectory for monitoring AT&C Losses.

The percentage AT&C losses shall be calculated as per the following formula:

% AT&C losses=100-CEx(1-DL/100)

Where:

CE is the % Collection Efficiency and

DL is the % Distribution Loss

57.4

Operation and Maintenance Expenses

The actual audited expenses for the financial year preceding the base year, subject to prudence check,

shall be escalated at the escalation factor of 4% to arrive at the Employee Costs and Administrative and

General Costs for the base year of the control period. The O&M expenses for the nth year of the control

period shall be approved based on the formula given below.

O&Mn = (R&Mn + EMPn + A&Gn)* (1-Xn) + Terminal Liabilities

Where,

R&Mn – Repair and Maintenance Costs of the Distribution Licensee(s) for the nth year;

EMPn – Employee Costs of the Distribution Licensee(s) for the nth year excluding

terminal liabilities;

A&Gn – Administrative and General Costs of the Distribution Licensee(s) for the nth

year;

The above components shall be computed in the following manner.

(a)

R&Mn= K * GFA *INDXn/ INDXn-1

Where,

‘K’ is a constant (expressed in %) governing the relationship between O&M costs

and Gross Fixed Assets (GFA) for the nth year. The value of K will be 1.65% for

DHBVN and UHBVN respectively for the entire control period;

‘GFA’is the average value of the gross fixed asset of the nth year.

‘INDXn

’means the inflation factor for the nth year as defined hereinafter.

(b)

EMPn(excluding terminal liabilities) + A&Gn= (EMPn-1 + A&Gn1)*(INDXn/ INDXn-1)

Where,

INDXn – Inflation Factor to be used for indexing the Employee Cost and A&G

cost. This will be a combination of the Consumer Price Index (CPI) and the

Wholesale Price Index (WPI) for immediately preceding year and shall be

calculated as under:

INDXn= 0.55*CPIn +0.45*WPIn.

HARYANA GOVT. GAZ., NOV. 12, 2019 (KRTK. 21, 1941 SAKA)

[ PART III

464

Note 1: For the purpose of estimation, the same INDXn value shall be used for all years

of the control period. However, the Commission shall consider the actual values of the

INDXn at the end of each year during the annual performance review exercise and true-up

the employee cost and A&G expenses on account of this variation.

Note 2: Any variation in employee cost and A&G cost on account of reasons beyond

variation in INDXn shall be subject to the incentive and penalty framework specified in

Regulation 12.

Note 3: As and when any material price index specific to power sector or a more relevant

Index becomes available, the same shall replace the Index used for working out R&M

cost.

Note 4: Terminal liabilities shall be approved as per actual expenditure incurred by the

distribution licensee or established through actuarial valuation for the ensuing year.

Note 5:O&M expenses made on account of extraordinary situations (if any) shall be

submitted to Commission for its approval. Such expenses shall be filed separately and

will not be subjected to incentive and penalty framework. The approved amount by the

Commission shall be trued up in the annual performance review.

Note 6: Changes in the pay scales of employees necessitated on account of pay revision

by Pay Commission or by the State Government orders shall be considered by the

Commission for true-up during the annual performance review.

Note 7: Source for CPI and WPI calculation as under:

Wholesale Price Index numbers as per Office of Economic Advisor of Government of

India in the previous year;

Consumer Price Index for Industrial Workers (all India) as per Labour Bureau,

Government of India in the previous year

(c)

Xn is an efficiency factor for nth year

The Value of Xn will be determined by the Commission in the MYT order for the control

period.

58

SALES AND POWER PURCHASE VOLUME

58.1

The distribution licensee shall forecast monthly sales for each customer category and sub-categories for

all years of the control period in their business plan and ARR filings, for review and approval by the

Commission.

58.2

So long as there are any un-metered agriculture consumers, the sales forecast for unmetered agriculture

consumer shall be validated with norms approved by the Commission on the basis of a proper study

carried out by the distribution licensee.

Note: These norms can be revised by the Commission based on actual data or better estimates made

available by the distribution licensee.

58.3

The Commission shall examine the forecasts for their reasonableness based on growth in the number of

consumers, pattern of consumption, losses and demand of electricity in previous years and anticipated

growth in the subsequent years and any other factor, which the Commission may consider relevant and

approve the sales forecast with such modifications as deemed fit;

58.4

Sale of electricity, if any, to electricity traders or other distribution licensee or outside state sales

through banking etc. shall be separately indicated;

58.5

The distribution licensee shall also indicate consumer category-wise open access consumers. The

demand and energy wheeled for them shall be shown separately for:

(i)

Supply within its area of supply; and

(ii)

Supply outside its area of supply;

58.6

Based on the above, the distribution licensee shall project month- wise and source-wise power purchase

requirement for each year of the control period.

58.7

The Commission shall scrutinize and approve the requirement for purchase of power with such

modifications as deemed fit, for each year of the control period;

58.8

Any power purchased by the distribution licensee over and above the requirement of power approved

by the Commission or variation in the mix of power purchased in any year shall be considered by the

Commission if it is for reasons beyond the control of the distribution licensee(s). The Commission

PART III]

HARYANA GOVT. GAZ., NOV. 12, 2019 (KRTK. 21, 1941 SAKA)

465

shall, however, estimate the revenue from such sales and allowable quantum of power purchase based

on target losses as per the FSA mechanism approved by the Commission. The resultant cost and

revenue shall be adjusted during true-up exercise for the said financial year in the next year’s tariff;

58.9

Any financial gain or loss on account of power purchased by the licensee in any year over and above

the approved level and not covered in the above sub Regulations shall be borne by the licensee.

59.

COST OF POWER PURCHASE

59.1 The distribution licensee shall be allowed to recover the cost of power it procures from all approved

sources including the power procured from the State-owned generating stations, independent power

producers, Central generating stations, renewable energy sources and others, for supply of power to

consumers, based on the sales forecast and losses for the distribution licensee approved by the

Commission for each year of the control period;

59.2

Approved retail sales level shall be grossed up by normative level of T&D losses as specified by the

Commission in the approved loss trajectory for the purpose of arriving at the quantity of power to be

purchased;

59.3

While approving the cost of power purchase, the Commission shall determine the quantum of power to

be purchased from various sources in accordance with the principles of merit order schedule and

despatch based on a ranking of all approved sources of supply in the order of their variable cost of

power. All power purchase costs will be considered legitimate unless the Commission concludes that

the merit order principle has been violated or power has been purchased at unreasonable rates except

for marginal purchases of transient nature beyond the control of the licensee subject, however, to

Regulation 59.2;

59.4

The cost of power purchased by the distribution licensees from generating stations of HPGCL shall be

worked out based on the tariff determined by the Commission. The cost of power purchase from central

generating stations shall be worked out based on the tariff determined by the CERC. Similarly, the cost

of power purchased from nuclear power stations of Nuclear Power Corporation of India Ltd. (NPCIL)

shall be worked out on the basis of tariff notified by the Departmental of Atomic Energy under the

Atomic Energy Act, 1961. In case of bilateral transactions, the rates as per PPAs approved by the

Commission shall be considered. The cost of power purchase from other generating companies /

sources shall be worked out based on invoices raised by the generators during the previous year. In

absence of above, rates based on bills of energy purchased during the previous 3 months shall be

considered by the Commission.

59.5

The cost of power purchase from non-conventional energy sources shall be based on the tariff

determined by the Commission as per renewable energy Regulations notified by the Commission and as

amended from time to time or as per the PPAs approved by the Commission.

59.6

Subject to provisions of clause 59.3, any variation in cost of power purchase at the allowed transmission

loss level, for reasons beyond the control of the distribution licensee, shall be allowed to be recovered by

the distribution licensee by way of FSA, as per the formula approved by the Commission and as

amended from time to time. The procurement price to be adopted for working out variation in the cost of

power beyond approved power purchase volume shall be the generation tariff approved by the

Commission, the rate discovered through competitive bidding and adopted by the Commission or the

short-term rates approved by the Commission.

59.7

Any loss on account of increase in power purchase cost, not covered above, shall be borne by the

distribution licensee subject to regulations 12 regarding sharing of gains and losses.

59.8

The Renewable Purchase Obligation (RPO) of the distribution licensee shall be as per the renewable

energy Regulations notified by the Commission as amended from time to time.

60.

SHORT-TERM POWER PROCUREMENT

60.1

The distribution licensee shall submit a rolling quarterly forecast of the quantum of short-term power to

be purchased for the year for the Commission’s approval. The forecast shall be based on monthly sales

forecast, the power available from approved long-term sources of power, merit order dispatch of

available sources, banking with other distribution utilities, load curtailment, time of its requirement,

availability of short-term power and the expected price. The distribution licensee shall provide the basis

for forecast of short-term power procurement price including the criteria for evaluation of alternative

options;

60.2

The Commission shall indicate the ceiling of short-term power purchase price and volume for the

ensuing quarter based on the availability of power, past requirement, approved quantum of short-term

HARYANA GOVT. GAZ., NOV. 12, 2019 (KRTK. 21, 1941 SAKA)

[ PART III

466

power in ARR, approval granted for past quarter and past market performance. The Commission may

ask for additional information and data as it may deem necessary for reviewing the forecast for the

ensuing quarter and the distribution licensee shall furnish such information within 2 weeks from being

asked to do so;

60.3

If there is a short term requirement of power by the distribution licensee over and above the quantum as

approved by the Commission and such requirement is on account of any factor beyond the control of

the distribution licensee (shortage/non-availability of fuel, snow capping of hydro resources inhibiting

power generation in sources stipulated in the plan, unplanned/forced outages of power generating units

or acts of God), then the cost shall be directly passed on to the consumers through FSA mechanism.

Provided that the cost of the additional power shall be allowed at the ceiling price for short term

power determined by the Commission in accordance with Regulation 60.2.

Provided further that in such a case, the distribution licensee shall inform the Commission about

the purchase of power over and above approved quantum with all of the supporting documents. Unless

the Commission is satisfied that the additional power is within the ceiling price of short-term power

determined by the Commission, it may disallow the quantum and cost of this short-term power

procurement in the True-Up order.

60.4

The variation in actual quantum and price of short-term power vis-a-vis the quantum and price of short-

term power approved by the Commission shall be subjected to prudence check by the Commission and

shall be adjusted on yearly basis along with the annual performance review based on the price and

quantum cap determined by the Commission for each quarter as mentioned in the above Regulation.

61.

TRANSMISSION AND SLDC CHARGES

61.1

The Inter-State transmission charges shall be estimated as per the order of the Central Electricity

Regulatory Commission;

61.2

The transmission charges, wheeling charges and other charges payable by the distribution licensee for

intra State transmission or wheeling of power purchased by it shall be considered as per tariff

determined by the Commission;

61.3 The reactive energy charges payable by the distribution licensee to the transmission licensee shall be

payable as per Regulation 5.5.1 of the Haryana Grid Code (HGC) as amended from time to time.

The reactive energy charges paid by the distribution licensee however shall not be recovered through

ARR. The capital investment plan to be prepared by the distribution licensee shall include capital

investment towards meeting the reactive energy requirement.

61.4 SLDC charges if paid separately in addition to charges for usage of transmission network shall be

considered as allowable expenses for the purpose of determination of tariff.

62.

WHEELING CHARGES

62.1 The consumers availing wheeling services for ‘open access’, will be charged a wheeling tariff as

determined under these Regulations;

The wheeling charge payable to the distribution licensee by long-term &medium-term open access

consumers shall be in Rs. / MW and shall be computed by dividing the approved ARR of the licensee

for wheeling business by peak load demand in MW served by the licensee in the preceding year.

Provided that wheeling charges shall be payable by the long-term and medium-term open

access consumers on the basis of contracted capacity in MW and by short-term open access consumers

on the basis of scheduled energy transactions cleared by the relevant Load Despatch Centre.

Provided further that wheeling charges (Rs. /kWh) payable by the short-term open access

consumers during a financial year shall be worked out by dividing the approved ARR (in Rs.) for

wheeling business for that year by the gross volume of energy wheeled (kWh) during the relevant year

as approved by the Commission.

Provided further that the Distribution Licensee shall be allowed to recover the approved level

of wheeling losses arising from the operation of the distribution system, as stipulated in the respective

Tariff Order from the short term open access consumers in addition to the wheeling charges as

determined above.

62.2 Income from wheeling from open access consumers:

25% of the wheeling charges collected from open access consumers shall be retained by the distribution

licensees and the balance 75% shall be adjusted towards reduction of ARR for the retail supply

business.

PART III]

HARYANA GOVT. GAZ., NOV. 12, 2019 (KRTK. 21, 1941 SAKA)

467

Provided that Wheeling Losses: The Distribution Licensee shall be allowed to recoverthe

approved level of wheeling losses arising from the operation of the distribution system, as stipulated in

the respective Tariff Order.

63. CROSS-SUBSIDY SURCHARGE / ADDITIONAL SURCHARGE

63.1

The cross-subsidy surcharge and additional surcharge under sections 39, 40 and 42 of the Act shall be

determined as per the Open Access Regulations notified by the Commission as amended from time to

time;

Cross-subsidy surcharge shall also be payable by such open access consumer who receives supply of

electricity from a person other than the distribution licensee in whose area of supply he is located,

irrespective of whether he avails such supply through transmission/distribution network of the licensee

or not.

The consumers located in the area of supply of a distribution licensee but availing open access

exclusively on inter-State transmission system shall also pay the cross subsidy/additional surcharge.

63.2

The cross-subsidy surcharge and additional surcharge shall be considered as non-tariff income for retail

supply. The licensee shall provide the consumer category-wise details of the cross – subsidy and

additional surcharge received during the year along with the tariff filings.

63.3

The distribution licensee shall also submit along with ARR, requisite calculation for determination of

cross subsidy surcharge and additional surcharge for consideration of the Commission. The cross-

subsidy surcharge and additional surcharge shall be payable as determined by the commission from

time to time.

64

BAD AND DOUBTFUL DEBTS

Bad and doubtful debts shall be allowed to the extent the distribution licensee has actually written off bad

debts subject to a maximum of 0.5% of sales revenue. However, this shall be allowed only if the distribution

licensee submits all relevant data and information to the satisfaction of the Commission. In case there is any

recovery of bad debts already written off, the recovered bad debts will be treated as other income.

Treatment of Demand Side Management Initiatives

The Commission shall introduce various policies like Time of Day (ToD) Tariff pertaining to Demand Side

Management in order to flatten the Load Curve of the State and optimise the Power Purchase Cost.

Provided also that Distribution Licensee shall submit the utilization of funds allocated for DSM

schemes and shall maintain separate records of Revenue/Expenditure related to individual DSM schemes

approved by the Commission.

65

QUALITY AND RELIABILITY OF SUPPLY

65.1 Distribution Transformers failure rate

(i)

The commission shall specify the norms for maximum permissible distribution transformers’

failure rate separately for urban and rural areas in the MYT order;

(ii)

In case the maximum permissible failure rate of distribution transformers exceeds the limits

specified above, the return on equity in Rs. crores shall be reduced as mentioned below:-

For Rural Areas

Absolute increase (%) in distribution transformers

failure rate from the norm

Percentage reduction in ROE

(Rs. Crores).

0

0

>0≤5 %

1%

>5≤10 %

2%

>10≤15%

3%

>15≤20%

5%

>20

5%+ Absolute increase (%) / 20%

HARYANA GOVT. GAZ., NOV. 12, 2019 (KRTK. 21, 1941 SAKA)

[ PART III

468

For Urban Areas

Absolute increase (%) in distribution transformers

failure rate from the norm

Percentage reduction in ROE

(Rs. Crores)

0

0

>0≤2.5%

1%

>2.5≤5%

2%

>5≤7.5%

3%

>7.5≤10%

5%

>10 %

5%+ Absolute increase (%) / 10%

Example: In case actual damage rate is 7% against normative damage rate of 5%, then absolute

increase is 2 %.

(iii)

The distribution licensee shall maintain a proper record of failure of the distribution transformers

and submit the same in the quarterly report to the Commission.

65.2 Monitoring progress on Standards of Performance

(i)

The distribution licensee shall provide requisite report on the progress of compliance of the

performance parameters as specified in the HERC (Standards of Performance for the

Distribution licensee) Regulations, 2004 as amended from time to time;

(ii)

The transmission licensee shall also provide requisite report on the progress of compliance of the

performance parameters as may be specified by the Commission in the “Standards of

Performance for the Transmission Licensee Regulations” to be notified by the Commission and

as amended from time to time.

(iii)

In case the distribution/transmission licensee fails to submit the report to Commission or delays

the submission by more than 2 months, the commission may reduce the return on equity by

0.50% if the licensee is not able to provide adequate justification for the delay.

(iv)

The distribution licensee shall submit and upload on their website circle-wise quarterly report

containing the following for their respective circle: -

(a)

Details of expenditure along with cost benefits analysis of each expenditure costing

above Rs. 2.50 lakh.

(b)

Distribution loss along with the reason for loss above 15%.

(c)

Status of pending connections (numbers & load).

(d)

Sale of power and billing done in the previous quarter along with the status of recovery.

(e)

Failure rate of transformers under warranty/out of warranty separately for rural & urban

area.

(f)

Three phase and single-phase defective meters pending for replacement.

(v)

The distribution licensee shall not distribute power to any category of consumers free of cost. No

approval from the Commission shall be sought in this regard.

(vi)

The distribution licenseeshall submit Voltage wise loss dataalong-with their True-up Petitions.

65.3 Audited Information

The Distribution Licensees shall submit the following Audited Information for the relevant Financial Year

along-with their True-up Petitions:

(a)

Category wise Sales

PART III]

HARYANA GOVT. GAZ., NOV. 12, 2019 (KRTK. 21, 1941 SAKA)

469

(b)

Category-Wise Break up of Revenue Billed

o

Fixed Charges,

o

Energy Charges,

o

Fuel Adjustment Surcharge etc.

(c)

Category-wise Revenue Collected

66

FUEL AND POWER PURCHASE COST SURCHARGE ADJUSTMENT (FSA)

66.1

The distribution licensees shall recover FSA amount on account of increase in fuel and power purchase

costs from the consumers on a quarterly basis so as to ensure that FSA accrued in a quarter is recovered

in the following quarter without going through the regulatory process i.e. FSA for the quarter “July to

September” is recovered in the following quarter “October to December”.

66.2

FSA shall be calculated only in respect of approved power purchase volume including short term power

purchase cost, if any, for the relevant year from all approved sources. Drawl of power under UI

mechanism, if any, shall be allowed only when it is not in violation of grid discipline and shall be

subject to a price cap of average revenue realisation from all consumer categories for that year.

Average revenue realisation = (Total revenue assessed for electricity supply in Rs + Government

Subsidy in Rs.) / Total sales in Units.

66.3

For the purpose of recovery of FSA, power purchase cost shall include all invoices raised by the

approved suppliers of power and credits received by the distribution licensees during the quarter

irrespective of the period to which these pertain for any change in cost in accordance with tariff

approved by any regulator/ government agency mentioned in Regulation 59.4. This shall include

arrears/refunds, if any, not settled earlier. In case data of the last month in a quarter is not available for

calculating FSA to be levied in the following quarter, the licensee shall use an estimate based on

available data of the first two months of the quarter. On availability of the actual figures, the difference

on this account shall form part of FSA of the subsequent quarter. If the actual data for any quarter is not

made available by the licensee before the end of the following quarter for this adjustment, the FSA

finally allowed for that quarter based on actual figures supplied after the prescribed date shall be limited

to the earlier estimated amount or the amount based on the actual figures, whichever is lower.

66.4

In case of negative FSA, the credit shall be given to the consumers by setting off the minus figure

against the positive figure of FSA being charged from the consumers. In other words, credit of FSA

shall be given only against FSA being charged so that the base tariff determined by the Commission

remains unchanged.

66.5

Only the allowed percentage of transmission and distribution losses for the relevant year as per the

approved ARR shall be considered for working out FSA.

66.6

The amount of FSA shall be recovered by each distribution licensee by charging a uniform FSA (per

kWh) across all consumer categories in his area of license.

66.7

For moderation purposes, the recovery of per unit FSA shall be limited to 15% of the approved per unit

‘average power purchase cost’ or such other ceiling as may be stipulated by the Commission from time

to time. For calculating FSA, variations in quarterly purchase volume from an approved source are

allowed subject to an overall ceiling of annual approved volume from that source. In case a portion of

the FSA for any quarter is not recovered due to the ceiling of 15%, the under recovered amount shall be

added to the FSA for the next quarter.

66.8

Per unit rate of FSA (paisa/kWh) shall be worked out after rounding off to the nearest paisa;

66.9

The distribution licensee shall submit details relating to FSA recovery to the Commission for each

quarter in the following format by the end of the following quarter.

(i)

Approved power purchase volume from approved sources (MU)

(ii)

Approved power purchase cost (Rs. million)

(iii)

Actual power purchase volume (MU)

(iv)

Power purchased (MU) from sources not covered under Regulation 66.2 giving source

wise details and in case of UI the frequency at which UI drawls were made. (disallowed

power purchase).

(v)

Actual cost of power purchase from all sources except (iv) (Rs. million)

HARYANA GOVT. GAZ., NOV. 12, 2019 (KRTK. 21, 1941 SAKA)

[ PART III

470

(vi)

Actual cost of disallowed power purchase relating to (iv) (Rs. million).

(vii)

Total FSA estimated to be recovered for the quarter (Rs. million).

(viii)

FSA per unit (Rs./kWh) being recovered during the following quarter.

(ix)

Actual FSA recovered/estimated to be recovered out of estimated FSA till the end of the

following quarter (Rs. million)

(x)

Under/ over recovered FSA (vii-ix) (Rs. million).

(xi)

Approved sales (Consumer category wise / month wise) for the quarter (MU)

(xii)

Actual sales (Consumer category wise / month wise) for the quarter (MU)

(xiii)

Estimated sales, consumer category wise, for the following quarter (MU).

Note:

1.

All the source-wise details should be supported with requisite documentary evidence / invoices

raised by the generators / suppliers of the power.

2.

Actual sales to AP consumers are to be calculated in accordance with the methodology approved

by the Commission in the ARR for the relevant year.

66.10

FSA (Rs/kWh) shall be worked out as per the following formula:

Total FSA (Rs million) = PC + Int + AdJstQ + (AdJstA/4)

FSA (Rs / kWh) = {PC + Int + AdJstQ + (AdJstA/4)} ÷ PS

Where

PC = {(Actual average power purchase cost (Rs/kWh) for the quarter) -(Average power

purchase cost (Rs/KWh) approved by the Commission for the relevant year)} X PP

PP = Total volume of power purchase during the quarter worked out based on total

volume of powers sold to all the consumer categories grossed up by approved T&D loss.

Sales to AP consumers are to be worked out in accordance with the methodology

approved by the Commission in the ARR for the relevant year (MU).

PS = Estimated sales volume for the following quarter with AP sales as approved by the

Commission in the ARR for the relevant year (MU).

Actual average power purchase cost (Rs. /KWh) = (total cost of power purchased during

the quarter from approved sources and UI as per Regulation 66.2 in Rs million) / (total

volume of power purchased in the quarter from approved sources and UI in MU) as per

Regulation 66.2).

Int = Additional working capital cost allowed on account of FSA amount to be worked out

as under:

Int = {(total FSA/12) X (interest rate allowed for calculation of working capital in the

ARR of the current financial year)} in Rs. million.

AdJstQ = Under/over recovered FSA of the previous quarter in accordance with

Regulation 66.3 and 66.7 in Rs. million.

AdJstA = Annual adjustment amount based on truing up of the FSA of the previous year

by the Commission in Rs. million.

66.11

The licensee shall ensure that the Actual/ estimated FSA arising in a quarter is recovered in the

following quarter. In case the licensee does not ensure levy of FSA based on the methodology given

herein, the licensee shall have no claim to recover the FSA from the consumers in any manner in any

subsequent period except in accordance with Regulation 66(3) and 66(7). The unrecovered FSA for

the previous financial year, details of which are supplied to the Commission by the distribution

licensee, may either form part of power purchase cost for the next financial year or may be allowed to

be recovered as annual adjustment amount in the quarterly recovery of FSA in the next financial year

as the Commission may decide.

66.12 In case Government of Haryana decides to provide subsidy on account of FSA to a particular

consumer category, the amount of subsidy equivalent to the FSA recoverable from the concerned

consumer category, shall be deposited in advance by the Government Otherwise the recovery shall be

affected from the consumer through electricity bills. It shall be the responsibility of the distribution

licensees to seek prior approval of the State Government in this regard and maintain appropriate

record of the same.

PART III]

HARYANA GOVT. GAZ., NOV. 12, 2019 (KRTK. 21, 1941 SAKA)

471

67.

NON-TARIFF INCOME

67.1

All incomes being incidental to electricity business and derived by the licensee from sources, including

but not limited to profit derived from disposal of assets, rents, meter rent, income from investments

other than contingency reserves, miscellaneous receipts from the consumers, etc shall constitute non-

tariff income of the licensee;

67.2

The amount received by the distribution licensee on account of non-tariff income shall be deducted

from the aggregate revenue requirement in calculating the net revenue requirement.

Provided that the distribution licensee shall submit full details of his forecast of non-tariff

income to the Commission in such form as may be stipulated by the Commission from time to time.

Provided that Late Payment Surcharge and Interest on Late Payment earned by the Distribution

company shall not be considered under Non-tariff Income.

67.3

The “non-tariff income” shall include but shall not be limited to the following:

a.

Income from rent of land or buildings or other assets;

b.

Income from sale of land and other assets;

c.

Income from sale of scrap;

d.

Income from statutory investments;

e.

Income from interest on contingency reserve investment;

f.

Interest on advances to suppliers/contractors;

g.

Rental from staff quarters;

h.

Rental from contractors;

i.

Income from hire charges from contactors and others;

j.

Income from advertisements, etc.;

k.

Miscellaneous receipts;

l.

Interest on advances to suppliers;

m.

Excess found on physical verification;

n.

Deferred Income from grant, subsidy, etc., as per Annual Accounts;

o.

Prior period income, etc.

68.

SUBSIDY

68.1

Pursuant to Section 65 of the Electricity Act, 2003 in case the State Government requires grant of any

subsidy to any consumer or class of consumers in the tariff determined under Section 62, the

distribution licensee should ensure that the State Government shall, notwithstanding any direction

which may be given under Section 108, pay in advance the requisite amount as determined by the

Commission to compensate the distribution licensee affected by the grant of subsidy.

68.2 A tariff reflecting subsidy shall not be implemented except to the extent that the State Government has

paid the subsidy to the distribution licensee in advance of supply to the consumers of the distribution

licensee entitled to benefit from it. In publishing its tariff, the distribution licensee shall inform its

consumers that the approved tariff calculated without subsidy shall apply if the State Government

subsidy is not so paid as determined by the Commission. The, ‘bill’ issued by the distribution licensee

shall clearly indicate:

(a)

the tariff determined by the Commission;

(b)

the amount of State Government subsidy, the rate and period;

(c)

the net amount payable by the consumer;

68.3 The amount of subsidy agreed to by the State Government may be provided in the form of payment in

cash in advance as per section 65 of Electricity Act or by book adjustment of net dues payable by the

distribution licensee to the State Government. The book adjustment shall be done on the basis of cash in

hand with the distribution licensee and not on an accrual basis in respect of dues to be collected by the

distribution licensee from consumers on behalf of the State Government.

69An INTER CATEGORY CROSS–SUBSIDY

69.1

The distribution licensee’s tariff proposal should reflect the reasonable cost of providing service to each

consumer class. In case where tariffs are historically distorted with significant level of cross-subsidy,

the aim should be to gradually move to non-cross subsidized tariffs.

69.2

In the annual performance review and tariff application, the distribution licensee shall include a report

on how far they have implemented the cross-subsidy reduction trajectory approved by the Commission

for reduction of cross-subsidy and the measures being proposed in the current application to implement

the plan.

HARYANA GOVT. GAZ., NOV. 12, 2019 (KRTK. 21, 1941 SAKA)

[ PART III

472

PART VIII - FILING OF AGGREGATE REVENUE REQUIREMENT

70.

Capital Investment Plan and Business Plan Filings

The distribution licensee shall file by 1st June and the generating company and the transmission licensee by

1st August of the first year of the control period or any other date as may be directed by the Commission, an

application containing the following elements for the approval of the Commission, along with requisite fee in

accordance with the provision of HERC (Fee) Regulation, 2005:

(a)

Capital Investment Plan as per details specified in Regulation 9.

(b)

Business Plan as per details specified in Regulation 10.

71.

Tariff Filings

71.2

Tariff filing for the control period under MYT framework

71.2.1 The generating company and the licensees shall file an application for approval of ARR

for their respective businesses for each year of the control period and tariff for the first

year of the control period consistent with the business plan and the capital investment

plan approved by the Commission. The ARR and tariff filing shall be filed by 30th

November of the year preceding the 1st year of the control period along with requisite fee

in accordance with the provisions of Haryana Electricity Regulatory Commission (Fee)

Regulations amended from time to time. The application shall contain all the components

of the ARR and tariff as provided in these Regulations;

The MYT filing shall also contain an application for mid-year performance review of and

true – up petition.

71.2.2 The generation company and the licensees shall provide in the application forecast for

each year of the control period of the various financial and operational parameters of

ARR & various other components of the ARR and tariff relating to their respective

businesses as mentioned in these Regulations. The application, in case of a distribution

licensee and a transmission licensee shall also include:

(i) For distribution licensee

(a)

Sales / demand forecast for each consumer category and sub-categories for

each year of the control period and the methodology and rationale used;

(b)

Power procurement plan based on the sales forecast and distribution loss

trajectory for each year of the control period. The power procurement plan should

also keep in view energy efficiency and demand side management measures;

(c)

A set of targets proposed for other controllable items such as collection

efficiency, recovery of bad debts, working capital, quality of supply targets, etc.

The targets shall be consistent with the capital investment plan and business plan

approved by the Commission;

(d)

Expected revenue from the licensed business, non-tariff income and

income from other business for the base year and first year of the control period

and other matters considered appropriate by the distribution licensee(s);

(e)

Number of consumers in each category, connected load in kW / kVA.

Voltage wise estimates losses and cost of supply for various consumer categories

per kW and per kWh / kVh

(f)

The ARR for different years of the control period, the revenue gap and

tariff proposal for meeting the revenue gap for first year of the control period. The

tariff proposal should be based on the cost of supply for various consumer

categories and the cross-subsidy reduction road map.

(g)

Proposal for meeting the projected cumulative revenue gap for first year of

the control period which shall include mechanism for meeting the proposed

revenue gap, tariff revision for various consumer categories etc. In the absence of

PART III]

HARYANA GOVT. GAZ., NOV. 12, 2019 (KRTK. 21, 1941 SAKA)

473

tariff proposal, the application/petition shall be considered as incomplete and shall

be liable for rejection.

(h)

A statement of the effect of the proposed tariff changes on a typical small,

average and large consumer in each tariff class. For this purpose, a typical small

consumer is defined such that within the tariff class, 90% of the consumers

supplied under that tariff within a 12-month period would have greater total

expenditure on tariff charges than the small consumer. Similarly, a typical large

consumer is defined such that 90% of the consumers supplied under the tariff

would have lesser expenditure over a 12-month period than the typical large

consumer. The average consumer shall be defined as a consumer having

expenditure on tariff charges equal to the average expenditure in that tariff class.

(ii)

For transmission licensee

(a)

The Transmission system or network usage forecast for each year of the

Control Period, consistent with the Business Plan;

(b)

Proposal for transmission tariff design for each year of the Control Period,

including the losses to be charged and the procedure thereof;

(c)

Proposal for transmission tariff for each year of the Control Period

supported by the adequate justification;

(d)

Estimates of Transmission Capacity allocated to each of the Transmission

system user for each year of the control period;

(e)

Proposal for reactive energy charges;

(f)

Proposal for SLDC charges (in case SLDC is controlled by the

transmission licensee);

(g)

Expected Revenue from the licensed Business, Non-Tariff Income and

income from Other Business and other matters considered appropriate by the

Transmission Licensee.

71.3

The generating company and the licensee shall also provide a copy of their respective

ARR/tariff filing to each other and also host the same on their respective websites;

71.4 The generating company and the licensees, within 7 (seven) days of filing of the

application for approval of ARR/Tariff, shall publish in Hindi and English in daily

newspapers having circulation in the area of licensees /generation company, the contents

of the application filed for approval of ARR/Tariff in an abridged form in such manner as

the Commission may direct for information of the public and shall provide copies of the

application and other documents filed with the Commission at a price not exceeding

normal photocopying charges. The generating company and the licensees shall also host

the application and other documents on their official websites.

71.5 The distribution licensee shall undertake a separate study to estimate the cost of supply

for various consumer categories and submit the same to the Commission for its approval

along with the MYT filing;

71.6 The distribution licensee shall also undertake a study for preparation of road map for

reduction of cross-subsidy and submit the same to the Commission for its approval along

with the MYT filing;

71.7 Notwithstanding anything contained in these Regulations, the Commission may at all

times, either Suo motu or on a petition filed by any interested or affected party, determine

the tariff, including terms and conditions thereof, of any generating company or the

licensee;

71.8

Approval of provisional tariff for a generating station

A Generating Company may also file a petition, not more than six months prior to the

anticipated Date of Commercial Operation (COD), for determination of provisional tariff

of the Unit or Stage or Generating Station as a whole, as the case may be, based on the

HARYANA GOVT. GAZ., NOV. 12, 2019 (KRTK. 21, 1941 SAKA)

[ PART III

474

capital expenditure actually incurred up to the date of making the petition or a date prior

to making of the petition, duly audited and certified by the statutory auditors and the

provisional tariff shall be charged from the date of commercial operation of such Unit or

Stage or Generating Station, as the case may be.

Provided that the Generating Company shall file a fresh petition in accordance

with these Regulations, for determination of final tariff based on actual capital

expenditure incurred up to the date of commercial operation of the Generating Station

duly certified by the statutory auditors based on Annual Audited Accounts.

Provided further that any difference in provisional tariff and the final tariff

determined by the Commission and not attributable to the Generating Company may be

adjusted at the time of determination of final tariff for the following year as directed by

the Commission.

71.9 Filing for Mid-year performance review, True-up and determination of tariff for

ensuing year

The generating company and the licensees shall file their application for mid-year

performance review of the current year, true-up of the previous year and tariff for the

ensuing year along with requisite fee by 30th November of each year of the control period

as per the details mentioned in the Regulation 11 & 13 for the Commission’s review,

true-up of uncontrollable/controllable items in accordance with Regulation 8.3 and

approval of tariff for the ensuing year.

72.

TARIFF ORDER

72.1 The Commission shall, within one hundred and twenty (120) days from the receipt of complete

application and after considering all suggestions and objections received from the public/other

stakeholders:

(i)

Issue a tariff order accepting the application with such modifications or such conditions as may

be contained in such order; or

(ii)

Reject the application for reasons to be recorded in writing if such application is not in

accordance with the provisions of the Act and the rules and Regulations made thereunder or the

provisions of any other law for the time being in force and direct the licensee to resubmit the

application after such modifications/amendments as may be directed by the Commission.

Provided that the applicant shall be given a reasonable opportunity of being heard before

rejecting the application.

72.2 The tariff so determined by the Commission shall be in force from the date specified in the said order

and shall, unless amended or revoked, continue to be in force for such period as may be stipulated

therein.

73.

PUBLICATION OF APPROVED TARIFF

The generating company and the licensees, as the case may be, shall publish the tariff approved by the

Commission in Hindi and English in daily newspapers having wide circulation in Haryana and shall put up the

complete tariff petition, including annexure, and approved tariff / tariff schedule on its website and make

available for sale, a booklet containing such tariff or tariffs, as the case may be, to any person upon payment of

reasonable reproduction charges.

74.

PERIODIC REVIEWS

74.1 To ensure smooth implementation of the Multi Year Tariff (MYT) framework, the Commission may

undertake periodic reviews of performance during the control period, to address any practical issues,

concerns or unexpected outcomes that may arise.

74.2 The generating company and the licensee shall submit information as part of annual review on actual

performance to assess the performance vis-à-vis the targets approved by the Commission at the

beginning of the control period. This shall include annual statements of its performance and accounts

including latest available audited / actual accounts and the tariff worked out in accordance with these

Regulations.

74.3 The Commission may approve any modifications to the forecast of the generating company or the

licensee for the remainder of the control period, with detailed reasons for the same.

PART III]

HARYANA GOVT. GAZ., NOV. 12, 2019 (KRTK. 21, 1941 SAKA)

475

75.

SUMMARY OF TIMELINES

Generating company and the licensee shall adhere to the following schedule for various activities for the first

control period:

Time Schedule for various activities for the 2nd Control Period

Sr.

No.

Description

Filing of document

Obtaining

additional

information and

acceptance by the

Commission

Approval of the

document by the

Commission

1

Capital

Investment

Plan

By 1st June by distribution

licensee and by 1st August by the

generation company/ transmission

licensee for each year of the

control period

Within 30 days of

filing of document

Within 45 days of

acceptance of the

filing

2

Business Plan (to be

filed only at the

beginning of Control

Period)

By 1st June by distribution

licensee and by 1st August by the

generation company/ transmission

licensee (only once during the

control period)

Within 30 days of

filing of document

Within 45 days of

acceptance of the

filing or from the date

of receipt of

additional

information

whichever is later.

3

Filing of MYT

Petition (ARR and

Tariff Proposal for the

control period

By 30th November of the year

preceding the first year of the

relevant year of the control

period.

Within 30 days of

filing of document

Within 120 days of

acceptance of the

filing but by 1st of

april of the 1st year of

the control period in

any case

4

Mid-Year

Performance

Review/True-up

By 30th November of each year

of the relevant year of the control

period

Within 30 days of

filing of document

Within 120 days of

acceptance of the

filing

HARYANA GOVT. GAZ., NOV. 12, 2019 (KRTK. 21, 1941 SAKA)

[ PART III

476

PART IX – MISCELLANEOUS

76.

HEARING

76.1 The Commission may hold hearing(s) on the ARR/tariff filing and hear such persons as the

Commission may consider appropriate to decide on such ARR/tariff filing.

76.2 The procedure of hearing on the ARR/Tariff filing shall be as per the provisions of the HERC (Conduct

of Business) Regulations, in vogue or in the manner as the Commission may decide from time to time.

76.3 Where the Commission considers appropriate it may appoint a consultancy firm / external expert in

order to arrive at a just and fair conclusion in any matter before it and so appoints some consultancy

company, it may require the generating company and the licensee to bear for the costs of such

consultancy, which shall be allowed as a pass through in the ARR.

77.

ISSUE OF ORDERS AND DIRECTIONS

Subject to the provision of the Act and these Regulations, the Commission may, from time to time, issue orders and

directions in regard to the implementation of these Regulations and procedure to be followed on various matters.

78.

POWERS TO REMOVE DIFFICULTIES.

If any difficulty arises in giving effect to any of the provisions of these Regulations, the Commission may, by a

general or special order, not being inconsistent with the provisions of these Regulations or the Act, do or undertake to

do things or direct the generating company or the licensee to do or undertake such things which appear to be

necessary or expedient for the purpose of removing the difficulties.

79.

POWER TO RELAX

The Commission may in public interest and for reasons to be recorded in writing, relax any of the provision of these

Regulations.

80.

INTERPRETATION

If a question arises relating to the interpretation of any provision of these Regulations, the decision of the

Commission shall be final.

81.

SAVING OF INHERENT POWERS OF THE COMMISSION

81.1 Nothing in these Regulations shall be deemed to limit or otherwise affect the inherent power of the

Commission to make such orders as may be necessary for ends of justice or to protect consumers’

interest or to prevent the abuse of the process of the Commission.

81.2 Nothing contained in these Regulations shall limit or otherwise affect the inherent powers of the

Commission from adopting a procedure, which is at variance with any of the provisions of these

Regulations, if the Commission, in view of the special circumstances of the matter or class of matters

and for reasons to be recorded in writing, deems it necessary or expedient to depart from the procedure

specified in these Regulations.

81.3 Nothing in these Regulations shall, expressly or by implication, bar the Commission to deal with any

matter or exercise any power under the Act for which no Regulations have been framed, and the

Commission may deal with such matters, powers and functions in a manner it thinks fit.

82.

ENQUIRY AND INVESTIGATION

All enquiries, investigations and adjudications under these Regulations shall be done by the Commission through the

proceedings in accordance with the provisions of the Conduct of Business Regulations, 2004 as amended from time to

time.

83.

POWER TO AMEND

The Commission, for reasons to be recorded in writing, may at any time vary, alter or modify any of the provision of

these Regulations after following the due process.

84.

REPEAL

The Haryana Electricity Regulatory Commission (Terms and Conditions for Determination of Tariff for Generation,

Transmission, Wheeling and Distribution & Retail Supply under Multi Year Tariff Framework) Regulations, 2012

including its subsequent amendments shall stand repealed.

PART III]

HARYANA GOVT. GAZ., NOV. 12, 2019 (KRTK. 21, 1941 SAKA)

477

Appendix I

Procedure for Calculation of Transmission System Availability Factor

The procedure for calculation of Transmission System Availability Factor shall be governed as per CERC regulations,

issued from time to time.

Appendix II

Depreciation Schedule

S. No. Asset Particulars

Useful life (Years)

Depreciation Rate

for first 12 years of the useful life

w.e.f. COD (Salvage Value = 10%)

A

Land under full ownership

Infinite

0

B

Land under lease

(a)

for investment in the land

The period of lease or the

period remaining

unexpired on the

Assignment of the lease

0

(b)

for cost of clearing the site

The period of lease

remaining unexpired at

the date of clearing the

date

0

C

Assets purchased new

(a)

Plant and Machinery in generating

plants

(i)

Hydro electric

35

5.28%

(ii)

Coal based and WHRB based

thermal plants

25

5.28%

(iii)

Diesel electric and gas plant

15

5.28%

(b)

Cooling towers &Circulating Water

Systems

25

5.28%

(c)

Hydraulic works forming part of

the Hydro-electric project

(i)

Dams, Spillways, Weirs, Canals,

Reinforced

concrete flumes and siphons

50

5.28%

(ii)

Reinforced concrete pipelines and

surge tanks, steel pipelines, sluice

gates, steel surge tanks, hydraulic

control valves and hydraulic works

35

5.28%

D

Building & Civil Engineering

works of a permanent character,

not mentioned above

(i)

Offices and showrooms

50

3.34%

(ii)

Containing thermo-electric

generating plant

25

3.34%

(iii)

Containing hydro-electric

generating plant

35

3.34%

HARYANA GOVT. GAZ., NOV. 12, 2019 (KRTK. 21, 1941 SAKA)

[ PART III

478

S. No. Asset Particulars

Useful life (Years)

Depreciation Rate

for first 12 years of the useful life

w.e.f. COD (Salvage Value = 10%)

(iv)

Temporary erections such as

wooden structures

-

100%

(v)

Roads other than Kutcha roads

50

3.34%

(vi)

Others

50

3.34%

E

Transformers, Transformer

Kiosk, Sub-Station equipment &

other fixed apparatus (including

plant foundations)

(i)

Transformers including foundations

having rating of 100 KVA and over

25

5.28%

(ii)

Others

25

5.28%

F

Switchgear including cable

connections

25

5.28%

G

Lightning arrestors:

(i)

Station type

25

5.28%

(ii)

Pole type

15

6.33%

(iii)

Synchronous condenser

35

5.28%

H

Batteries

5

5.28%

I

Underground cable including

joint boxes and disconnected

boxes

35

5.28%

J

Cable duct system

50

5.28%

K

Overhead lines including

supports

(i)

Lines on fabricated steel towers

operating at nominal voltages

higher than 66 KV

35

5.28%

(ii)

Lines on steel supports operating at

nominal voltages higher than 13.2

KV but not exceeding 66 KV

25

5.28%

(iii)

Lines on steel or reinforced

concrete supports

25

5.28%

(iv)

Lines on treated wood supports

25

5.28%

L

Meters

15

5.28%

M

Self-propelled vehicles

5

9.50%

N

Air Conditioning Plants

(i)

Static

15

5.28%

(ii)

Portable

5

9.50%

PART III]

HARYANA GOVT. GAZ., NOV. 12, 2019 (KRTK. 21, 1941 SAKA)

479

S. No. Asset Particulars

Useful life (Years)

Depreciation Rate

for first 12 years of the useful life

w.e.f. COD (Salvage Value = 10%)

O

Office equipments

(i)

Office furniture and furnishing

15

6.33%

(ii)

Office equipment

15

6.33%

(iii)

Internal wiring including fittings

and apparatus

15

6.33%

(iv)

Street Light fittings

15

5.28%

P

Apparatus let on hire

(i)

Other than motors

5

9.50%

(ii)

Motors

15

6.33%

Q

Communication equipment

(i)

Radio and high frequency carrier

system

15

6.33%

(ii)

Telephone lines and telephones

15

6.33%

R

IT equipment

6

15.00%

S

Fibre optic

15

6.33%

T

Any other assets not covered

above

15

5.28%

By Order of the Commission

(Sd.)…,

Director / Tariff

HERC

[227-1]

57441—C.S.—H.G.P., Chd.