HARYANA ELECTRICITY REGULATORY COMMISSION
BAYS NO. 33-36, SECTOR-4, PANCHKULA-134113, HARYANA
Tel. No. 0172-2572395 (O), Fax No. 0172-2572359
www.herc.nic.in
Notification
The 24th April, 2020
Standards of Performance of Distribution Licensees and Determination of Compensation Regulations, 2020
Statement of Objects and Reasons
In exercise of the powers conferred under Section 57 and 59 read with subsection 2(za) and 2(zb) of section
181 of the Electricity Act 2003 (Act No.: 36 of 2003) and all other powers enabling in this behalf, the Haryana
Electricity Regulatory Commission specified the Standards of Performance for the Distribution Licensee through The
Haryana Electricity Regulatory Commission Regulation No. HERC/04/2004: Haryana Electricity Regulatory
Commission (Standards of Performance for the Distribution Licensee) Regulations, 2004.
Thereafter an amendment to these `Regulations was issued on 11th September 2007 as Haryana Electricity
Regulatory Commission (Standards of Performance for the Distribution Licensee) 1st Amendment, Regulation, 2007.
Commission further received, a report, on Power Quality of Electricity Supply to the Consumers, dated
14.9.2018 from Forum of Regulators for consideration of the State Regulatory Commissions to frame such
regulations. The report lay emphasis on the need for Regulations on Power Quality which define the Power Quality
indices, role and responsibilities of various entities, Standards/ limits to be followed, incentive/ disincentive
mechanism and procedure for monitoring, management and control of all aspects of Power Quality while exploring
the present legal frame work and the global regulatory scenario.
In view of above, the Draft Discussion Paper for the Regulations “Haryana Electricity Regulatory Commission
(Standards of Performance of Distribution licensees and Determination of Compensation) Regulations, 2018 was
prepared considering the various Power Quality Parameters. The last date of filing suggestions/comments/objections
on the said draft Regulations was 01/02/2019 and the Public hearing was held on 20/02/2019.
Thereafter, based on the suggestions/comments/objections, the Commission prepared Draft Regulations
“Haryana Electricity Regulatory Commission (Standards of Performance of Distribution licensees and Determination
of Compensation) Regulations, 2019 and uploaded the same on its website for seeking comments on the said draft
Regulations by 21/05/2019. The Distribution Licensees submitted their comments on the same.
PART III]
HARYANA GOVT. GAZ., MAY 12, 2020 (VYSK. 22, 1942 SAKA)
203
The Commission, after due consideration of the written comments/objections received from public, Haryana
Power Utilities and other stake holders and views expressed/issues raised in the Public Hearing, have accordingly
made the necessary amendments in the draft regulations and have finalized the Draft for Haryana Electricity
Regulatory Commission (Standards of Performance of Distribution licensees and Determination of Compensation)
Regulations, 2020.
Regulation No. HERC/50/ 2020.— In exercise of powers conferred by the proviso of clause (za) of sub-section (2)
of Section 181 and clause (zp) of sub-section (2) of Section 181 read with sub-section(1) of Section 57, sub-section
(2) of Section 57, sub-section (1) of Section 59 and clause (i) of sub-section (1) of Section 86 of the Electricity Act,
2003 (36 of 2003), the Haryana Electricity Regulatory Commission hereby makes the following Regulations:-
1.
Short Title, Commencement and Scope Extent
1.1.
These Regulations may be called the “Haryana Electricity Regulatory Commission (Standards of
Performance of Distribution Licensees and Determination of Compensation) Regulations, 2020”.
1.2
These Regulations shall come into force from the date of their publication in the Official Gazette of
Haryana.
1.3
These Regulations shall be applicable to all Distribution and Retail Supply Licensee(s) including
Deemed Licensee(s) and consumer(s) of electricity in the State of Haryana.
Definitions and Interpretations
2.1
In these Regulations unless the context otherwise requires.
(a)
“Act” means the Electricity Act, 2003 (36 of 2003) as amended from time to time;
(b)
“Applicant” means an owner or occupier of any land/premises who files an application with a Licensee
for supply of electricity, increase or reduction in sanctioned load/contract demand, change in title,
shifting of meter/connection/line/distribution transformer etc., disconnection or restoration of supply, or
termination of agreement, as the case may be, in accordance with the provisions of the Act and the
Codes, Rules and Regulations made there under or other services;
(c)
“Area of Supply” means the area within which a Licensee is authorized by his Licence to supply
electricity;
(d)
“Authorised Representative” of any person/entity means all officers, staff, representatives or persons
discharging functions under the general or specific authority of the person concerned /entity;
(e)
“Billing cycle or billing period” means the period for which regular electricity bills as specified by the
Commission, are prepared for different categories of consumers by the Licensee. This is the period
between two consecutive meter reading dates;
(f)
“Call Centre” means the office set up by the distribution licensee(s) (may be at back end or customer
interfacing front end) with adequate technology and systems for registering complaints round the clock;
(g)
“Clearance(s)” means necessary approval(s) / No Objection Certificate(s) (NOC) sought from all
relevant persons or authorities including Municipal Authorities which is required for the execution of
work(s) by the Distribution Licensee(s);
(h)
“Commission” means the Haryana Electricity Regulatory Commission;
(i)
“Days ” means working days i.e excluding gazetted holidays and Sundays.
(j)
“Fuse-off” means fuse blown off because of overloading/ageing or for any other reasons.
(k)
“Harmonics” means a component of a periodic wave having frequency that is an integral multiple of
the fundamental power line frequency of 50 Hz causing distortion to pure sinusoidal waveform of
voltage or current, and as governed by IEEE STD 519-1992, namely “IEEE Recommended Practices
and Requirements for Harmonic Control in Electrical Power Systems” and corresponding standards as
may be specified by the CEA;
(l)
“Load Shedding” means a period during which the SLDC has directed the Licensee to reduce the load
in order to ensure the safety of Grid and reasons attributed to the same. A period of Grid failure due to
force majeure event will not be covered under it;
(m)
“Meter” means an equipment used for measuring, indicating and recording quantities including energy
in kWh or kVAh, maximum demand in kW or kVA, reactive energy in kVARh and accessories
including Current Transformer (CT), Voltage Transformer (VT) / Potential Transformer (PT) /
Capacitor Voltage Transformer (CVT), where used in conjunction with such meter. It shall also include
necessary wiring, any seal or sealing arrangement and other associated equipment provided by the
Distribution Licensee for sealing, reliability and for preventing theft/unauthorized use of electricity;
HARYANA GOVT. GAZ., MAY 12, 2020 (VYSK. 22, 1942 SAKA)
PART III]
204
(n)
‘Continuous Phenomenon’ means deviations from the nominal values that occur continuously over a
long period of time;
(o)
‘Contract Demand’ means demand in kilowatt (kW)/kilovolt ampere (kVA)/Horse Power (HP) as
mutually agreed between Distribution Licensee and the Consumer and as entered into in the agreement
for which Distribution Licensee makes specific commitment to supply from time to time in accordance
with the governing terms and conditions contained therein or equal to the sanctioned load, where the
contract demand has not been provided through /i the agreement.
(p)
‘Declared Supply Voltage (Uc)’ means the voltage at the consumers supply terminals declared by the
supplier of electrical energy. Declared supply voltage is usually equal to the nominal voltage;
(q)
‘Designated Customers’ means the customers identified as major power quality polluters due to
their installed non-linear loads or generation or otherwise under these Regulations and shall interalia
include commercial buildings (Healthcare, Hotels, Airports, malls etc.), IT/ITES and Banking, Finance
& Service Industries (BFSI), Automobiles, Iron & Steel, Aluminium, Textile, Paper & Pulp, Chlor-
Alkali, Petro-Chemical, Cement, Pharmaceuticals, Fertiliser, Food Processing, Plastic & Rubber and
Railways/Metros, grid connected distributed generating resource and Electric Vehicle Charging
infrastructure etc.;
(r)
‘Flicker’ means the impression of unsteadiness of visual sensation induced by a light stimulus whose
luminance or spectral distribution fluctuates with time. It is caused under certain conditions by voltage
fluctuation changing the luminance of lamps;
(s)
‘Flicker Severity’ means intensity of flicker annoyance evaluated by the following quantities:
i.
Short term severity (Pst) measured over a period of 10 min;
ii.
Long term severity (Plt) calculated from a sequence of twelve Pst-values over a 2 hour time
interval;
(t)
‘Forum’ means as defined under Haryana Electricity Regulatory Commission (Consumer Grievance
Redressal Forum & Electricity Ombudsman) Regulations including any amendment thereto in force
from time to time ;
(u)
‘Frequency’ means the number of alternating cycles per second [expressed in Hertz (Hz)];
(v)
‘Grid Code’ means the Grid/Distribution Code as specified by the Haryana Electricity Regulatory
Commission;
(w)
‘Grid Standards’ means the Grid Standards specified by the Authority;
(x)
‘Harmonics’ means the sinusoidal component of a periodic wave, either Voltage or Current waveform,
having a frequency that is an integral multiple of the fundamental frequency of 50 Hz;
(y)
‘High Voltage’ means the voltage whose nominal r.m.s. value is more than 33000 volts but less than or
equal to 150000 volts as per IS 12360:1988 standard;
(z)
‘Indian Standards (IS)’ means standards specified by Bureau of Indian Standards;
(aa)
‘IEC Standard’ means a standard approved by the International Electro technical Commission;
(bb) ‘Interconnection Point (Distribution System)’ a point on the electricity system, including a sub-
station or switchyard, where the interconnection is established between the customer and the electricity
system of the distribution licensee and where electricity injected into or drawn from the electricity
system can be measured unambiguously for the customer;
(cc)
‘licensee’ means the distribution licensee;
(dd) ‘Low Voltage (LV)’ means the voltage whose nominal r.m.s. value is less than or equal to 1000 Volts
as per IS 12360:1988 standard;
(ee)
‘Medium Voltage (MV)’ means the voltage whose nominal r.m.s. value is more than 1000 volts but
less than or equal to 33000 volts as per IS 12360:1988 standard;
(ff)
‘Maximum demand load current’ means the current value at the point of common coupling
calculated as the sum of the currents corresponding to the maximum 15 minute demand during each of
the twelve previous months divided by 12;
(gg)
‘Nominal voltage (of the Distribution System) (Un)’ means the value of voltage by which the
electrical installation or part of the electrical installation is designated and identified;
(hh) ’Normal Operating Condition’ means operating condition for an electricity network, where
generation and load demands meet, system switching operations are concluded, faults are cleared by
automatic protection systems and in the absence of:
PART III]
HARYANA GOVT. GAZ., MAY 12, 2020 (VYSK. 22, 1942 SAKA)
205
i.
temporary supply arrangement;
ii.
exceptional situations such as:
a.
exceptional weather conditions and other natural disasters;
b.
force majeure;
c.
third party interference;
d.
acts by public authorities;
e.
industrial actions (subject to legal requirements);
f.
power shortages resulting from external events
(ii)
‘Nominal Frequency’ means the frequency of 50.00 Hz of the supply voltage.
(jj)
‘Point of Common Coupling (PCC)’ means the point of metering, or any other point on supply
system of distribution licensee, electrically nearest to the particular load at which other loads are, or
could be, connected. For service to industrial users (i.e., manufacturing plants) via a dedicated service
transformer, the PCC is usually at the HV side of the transformer. For commercial users (office parks,
shopping malls, etc.) supplied through a common service transformer, the PCC is commonly at the LV
side of the service transformer.
(kk) ‘Power Factor’ or ‘Displacement Power Factor’ means the cosine of the electrical angle between the
voltage and current vectors in an AC electric circuit;
(ll)
‘Power Quality Meter’ means a device suitable for monitoring and recording of power quality. It shall
be capable of accurate measurement, monitoring and recording of harmonics, sags, swells, flickers and
other power quality parameters;
(mm) ‘Rural areas’ mean the areas covered by Gram Panchayats, including major and minor Panchayats;
(nn) ‘r.m.s. (root-mean-square) value’ means square root of the arithmetic mean of the squares of the
instantaneous values of a quantity taken over a specified time interval and a specified bandwidth;
(oo)
‘Sanctioned load’ means load in kilowatt (kW)/kilovolt ampere (kVA)/Horse Power (HP) for which
the Distribution Licensee had agreed to supply from time to time subject to governing terms and
conditions;
(pp) ‘Supply Area’ means the area within which a Distribution Licensee is authorized by his License to
supply electricity;
(qq) ‘Supply Terminals’ means point in a distribution system designated as such and contractually fixed, at
which electrical energy is exchanged between the Customer and distribution licensee. This point can
differ from the electricity metering point or the point of common coupling.
(rr)
‘Supply Voltage’ means the r.m.s. value of the voltage at a given time at the supply terminal, measured
over a given interval;
(ss)
‘Supply Voltage Interruption’ is a condition in which the voltage at the supply terminals is
completely lost or lower than 10% of the nominal voltage condition. It can be classified as:
a.
Planned or Prearranged Supply Interruptions means a supply interruption when network users
are informed in advance;
b.
Forced or Accidental Supply Interruptions, caused by permanent or transient faults, mostly
related to external events, equipment failures or interference.
c.
A Planned or forced supply interruption is classified as:
i.
Sustained or long interruption means supply interruption is longer than 3 min;
ii.
Short interruption means supply interruption is from 20ms to 3 min;
d.
For poly-phase systems, a supply interruption occurs when the voltage falls below 10% of
the nominal voltage on all phases (otherwise, it is considered to be a dip).
(tt)
‘Supply voltage dip’ means a temporary reduction of the r.m.s. supply voltage at a given point in the
electrical supply system of 10 to 90% of the declared voltage for a duration from 10 ms up to and
including 1 min. Typically a dip is associated with the occurrence and termination of a short-circuit or
other extreme current increase on the system or installation connected to it;
(uu) ‘Supply voltage dip duration’ means time between the instant at which the r.m.s. voltage falls below
the start threshold and the instant at which it rises to the end threshold. For poly-phase events, a dip
begins when one voltage falls below the dip start threshold and ends when all voltages are equal to or
above the dip end threshold.
HARYANA GOVT. GAZ., MAY 12, 2020 (VYSK. 22, 1942 SAKA)
PART III]
206
(vv)
‘Supply voltage dip end threshold’ means r.m.s. value of the supply voltage specified for the purpose
of defining the end of a supply voltage dip;
(ww) ‘Supply voltage dip start threshold’ means r.m.s. value of the supply voltage specified for the
purpose of defining the start of a supply voltage dip;
(xx)
‘Supply voltage dip Residual Voltage’ means minimum value of r.m.s. voltage recorded during a
voltage dip;
(yy)
‘Supply voltage swells (temporary Power Frequency Overvoltage)’ means temporary increase in the
r.m.s. supply voltage at a given point in the electrical supply system above 110 of the declared voltage
for a duration from 10 ms up to and including 1 min;
(zz)
‘Supply voltage swell duration’ means time between the instant at which the r.m.s. voltage exceed the
start threshold and the instant at which it falls below the end threshold;
(aaa) ‘Supply voltage swell end threshold’ means r.m.s. value of the supply voltage specified for the
purpose of defining the end of a supply voltage swell;
(bbb) ‘Supply voltage swell start threshold’ means r.m.s. value of the supply voltage specified for the
purpose of defining the start of a supply voltage swell;
(ccc) ‘System Average Interruption Duration Index’ (SAIDI) means the average duration of sustained
interruptions per consumer occurring during the reporting period, determined by dividing the sum of all
sustained consumer interruptions durations, in minutes, by the total number of consumers;
(ddd) ‘System Average Interruption Frequency Index’ (SAIFI) means the average frequency of sustained
interruptions per consumer occurring during the reporting period, determined by dividing the total
number of all sustained consumer interruption by the total number of consumers;
(eee) ‘True Power Factor’ means the ratio between total active power used in a circuit (including
harmonics) and the total apparent power (including harmonics) supplied from the source. True power
factor is always less than displacement power factor if harmonics are present in the system;
(fff)
‘Transient over voltages’ means short duration oscillatory or non-oscillatory over voltages usually
highly damped and with duration of few ms or in microseconds;
(ggg) ‘Total Demand Distortion (TDD)’ means the ratio of the root mean square of the harmonic content,
considering harmonic components up to the 50th order, expressed as a percent of the maximum demand
current;
(hhh) ‘Total Harmonic Distortion’ or ‘THD’ means the ratio of the root mean square of the current
harmonic content, considering harmonic components up to the 50th order, expressed as a percent of the
fundamental;
(iii)
‘Voltage Events’ means sudden and significant deviations from normal or desired wave shape.
Voltage events typically occur due to unpredictable events (e.g. faults) or due to external causes (e.g.
weather conditions);
(jjj)
‘Voltage Fluctuation’ or ‘Voltage Variations’ means series of voltage changes or a cyclic variation of
the voltage envelope, the magnitude of which does not normally exceed the specified voltage ranges;
(kkk) ‘Voltage unbalance’ means a condition in a poly-phase system in which the r.m.s. values of the line-
to-line voltages (fundamental component), or the phase angles between consecutive line voltages, are
not all equal. The degree of inequality is usually expressed as the ratios of negative and zero sequence
components to the positive sequence component;
(lll)
‘Urban Areas’ means the areas covered by all Municipal Corporations and other Municipalities
including the areas falling under the various Urban Development Authorities, Cantonment Authorities
and Industrial Estate and Townships including those specified by the Haryana Government;
(mmm) “Voltage” means, the difference of Electric potential measured in volts between any two conductors
or between any part of either conductor and the earth, as measured by a Voltmeter meeting Indian
Standards;
“Low voltage ”, where the voltage does not exceed 250 volts,
“Medium voltage”, where the voltage exceeds 250 volts but does not exceed 650 volts,
“High voltage”, where the voltage exceeds 650 volts but does not exceed33,000 volts,
“ Extra High voltage”, where the voltage exceeds 33,000 volts :
(nnn) “voltage unbalance” means the ratio of the maximum voltage deviation of the phase voltage from the
average phase voltage to the average phase voltage of the three phases;
PART III]
HARYANA GOVT. GAZ., MAY 12, 2020 (VYSK. 22, 1942 SAKA)
207
2.2
Words, terms and expressions defined in the Electricity Act, 2003, as amended from time to time and used in
these Regulations, shall have and carry the same meaning as defined and assigned in the said Act.
All other expressions used herein but not specifically defined in these Regulations or in the Act but defined
under the Haryana Electricity Reform Act, 1997 shall have the meaning assigned to them under the same Act,
provided that such definitions in the Haryana Electricity Reform Act, 1997 are not inconsistent with the
provisions of the Electricity Act, 2003.
2.3
In interpretation of these Regulations, unless the context otherwise requires:
(1)
Words in the singular or plural term, as the case may be, shall also be deemed to include the plural or
the singular term, respectively;
(2)
References to any statutes, regulations or guidelines shall be construed as including all statutory
provisions consolidating, amending or replacing such statutes, Regulations or guidelines, as the case
may be, referred to;
(3)
Terms "include" or "including" shall be deemed to be followed by "without limitation" or "but not
limited to" regardless of whether such terms are followed by such phrases or words of like import.
2.4
Any reference to Regulations without any qualification shall be considered as reference to these Regulations.
3.
Standards of Performance of Distribution Licensees
3.1
The Standards of Performance specified herein shall be the minimum acceptable standard of service
with reference to quality, continuity and reliability of services that a Licensee shall achieve and
maintain in discharge of his obligations as a Distribution Licensee. The Standards of Performance may
be different across the area of a Distribution Licensee and across the Distribution Licensees based on
the concentration of population, local environment and conditions. The categorization shall be
applicable to both Urban as well as rural areas;
3.2
Any failure by the Distribution Licensee to achieve and maintain the standards of performance
specified in these Regulations shall render the Distribution Licensee liable to payment of compensation
under the Act, as specified in Schedule I, to an affected person claiming such compensation.
3.3.1 Standards of Performance specified in Schedule-I relates to Guaranteed Standards of
Performance for which consumers against whom no arrear other than of billing current cycle is
pending on the date of violation are eligible for claiming the compensation in the manner
provided in the Schedule-I in case the Licensee fails to provide services as per the Standards of
Performance.
3.3.2 The concerned officer (SDO in charge, who fails to comply with the time-lines for rendering
services as mandated under this regulation, without prejudice to any penalty which may be
imposed or prosecution be initiated, he shall be liable to pay a fine of Rs 1000 (Rupees one
thousand ) per day for each day of delay subject to Rs 10,000 (Rupees ten thousand) maximum,
in each case and such fine shall be payable by both SDO and XEN in charge of the sub division
concerned in equal proportion.
Provided that complaint against non-compliance of the time-lines have to be filed by
aggrieved person before the Commission and the Commission may after providing an
opportunity of being heard to the parties shall impose the penalty thereafter.
3.4
Provided that any time limits set out in these Regulations shall refer to the maximum time permitted for
performing the activities to which they relate to.
3.5
In case of applications requiring supply under agriculture category (Agriculture Pump sets) Licensee’s
obligation shall be limited to the number of connections that can be covered within the target fixed by
the State Government for release of agricultural connections for a financial year. The target for an
ensuing year should be fixed and made public at least 2 months before the commencement of the year.
The licensee shall inform the applicants in writing within 15 days of receipt of applications, if the
applicant’s case cannot be covered in the programme of release of Agriculture Pump set connections
fixed for the year.
3.6
The Licensees shall ensure 100% correct metering and replace the defective/dead/burnt meters within
the prescribed period as mandated in these Regulations. In case, the consumer desires to install its own
meter then he shall be allowed to install the Smart Meter, compliant to the approved specifications.
3.7
The standards specified in Schedule-II shall be the overall standards of performance which the Licensee
shall seek to achieve in discharge of its obligations. However, against violation of any such
overall/general standards, any claim of compensation will not be admissible.
HARYANA GOVT. GAZ., MAY 12, 2020 (VYSK. 22, 1942 SAKA)
PART III]
208
4.
Period for Giving Supply
4.1
New Connection/Additional Load/ Reduction in Load/Temporary Connection/Shifting of
meters/service lines/Equipment
The Distribution Licensee shall follow the procedure and timelines specified under Electricity Supply
Code, Regulations, 2014 including any amendments thereto in force from time to time for effecting
services including new connection/additional load/reduction in load/ temporary connection/Shifting of
meters / service lines/Equipment.
4.2
Change of name/Reclassification of consumer category/change of tariff category
The Distribution Licensee shall effect change of name/reclassification of consumer category/change of
category as per the procedure and timelines specified under Electricity Supply Code, Regulations, 2014
including any amendments thereto in force from time to time. The change shall be reflected in the
electricity bill of applicant within the second billing cycle.
5.
Standard of Power Quality
5.1
Supply Voltage Variations
(1) The supply voltage variations in LV and MV networks from declared voltage shall comply with
Table given below and specified with reference to mean r.m.s. values of supply voltage measured over
10 min.
Table 1 – Supply Voltage Variation Limits for LV Systems Interconnected with Transmission System.
Supply Voltage
Characteristic
Reference Time Frame
Limits
Mean r.m.s. value of the
Supply voltage over 10 min
95% of each period of one
week
Un ± 10 %
100% of time
Un + 10 % / - 15%
Table 2 – Supply Voltage Variation Limits for MV Systems Interconnected with Transmission System.
Supply Voltage
Characteristic
Reference Time Frame
Limits
Mean r.m.s. value of the
Supply voltage over 10 min
99% of each period of one week
Un ± 10 %
100% of time
Un ± 15%
Table 3 – Supply Voltage Variation Limits for LV and MV Systems not interconnected with
Transmission System
Supply Voltage
Characteristic
Reference Time Frame
Limits
Mean r.m.s. value of the supply
voltage
over 10 Min
100% of time
Un +10 % / -15 %
Provided that:
The measurements shall be undertaken in accordance with applicable notified IS and in absence of IS, IEC
61000-4-30:2015 as amended from time to time;
For statistical evaluation, voltage variations shall be assessed for the period not less than 7 continuous days.
The short time 10 min values (measured as per IEC) are accumulated over periods of one week and the 95th and 99th
percentile values (i.e., those values that are exceeded for 5% and 1% of the measurement period) are calculated for
each 7-day period for comparison with the recommended limits. The values are measured in normal operating
condition.
For poly-phase systems, the voltage variations shall be measured in all phases of supply.
PART III]
HARYANA GOVT. GAZ., MAY 12, 2020 (VYSK. 22, 1942 SAKA)
209
5.2 Supply Voltage Flicker (Pt)
(1)
The voltage flicker shall be assessed in two different severity level: Long-Term severity (Plt)
and Short-Term severity (Pst). Short term severity shall be measured over a period of 10 min
and long-term severity shall be calculated from a sequence of twelve Pst-values over a 2-hour
time interval, according to the following expression:
Plt = 3√∑P3St/12
I=1 to 12
The permissible limits of short-term voltage flicker and long-term voltage flicker severity
for distribution licensee shall be 1.0 and 0.8 at all supply terminals 100% of the time
respectively.
Provided that:
The measurements shall be undertaken in accordance with IEC 61000-4-30;
For statistical evaluation, voltage flicker shall be assessed for the period not less than 7
continuous days. The short time 10 min values are accumulated over periods of one week and
the 95th percentile values (i.e., those values that are exceeded for 5% of the measurement
period) are calculated for each 7-day period for comparison with the recommended limits. The
values are measured in normal operating condition excluding the time period of a voltage dip.
For poly-phase systems, the voltage flicker shall be measured in all phases of supply.
5.3
Supply Voltage Unbalance (UB)
(1) The supply voltage unbalance in respect of three phase supply shall be assessed from the ratio of
rms value of negative phase sequence component (fundamental) to the rms value of positive phase
sequence component (fundamental) of the supply voltage. The supply voltage unbalance shall be
maintained less than or equal to 2% by the distribution licensee.
Provided that:
For statistical evaluation, voltage unbalance shall be assessed for the period not less than 7 continuous
days. The short time 10 min values are accumulated over periods of one week and the 95th percentile
values (i.e., those values that are exceeded for 5% of the measurement period) are calculated for each 7-
day period for comparison with the recommended limits. The values are measured in normal operating
condition.
5.4
Voltage Dip or Sag
(1)
The Supply voltage dips shall comply with Table given below and are specified with reference
to:
i.
Number of events per year
ii.
Event duration (t)
iii.
Residual Voltage (u)
iv.
Declared voltage (Uc)
Table 4: Supply Voltage Dip Limits for LV and MV Networks in Terms of Number of Events per Year
Residual
Voltage (%)
Duration t (ms)
10 ≤ t ≤ 200
200 < t ≤ 500
500 < t ≤ 1000
1000 < t ≤ 5000
5000 < t ≤ 60000
90 > u ≥ 80
30
40
10
5
5
80 > u ≥ 70
30
40
5
5
5
70 > u ≥ 40
10
40
5
5
5
40 > u ≥ 5
5
20
5
5
5
Provided that:
The voltage dips shall be measured in accordance with IEC 61000-4-30 and shall not fall outside the duration
from 10 ms up to and including 1 min;
The voltage dips shall be measured in all phases of supply.
HARYANA GOVT. GAZ., MAY 12, 2020 (VYSK. 22, 1942 SAKA)
PART III]
210
5.5
Voltage Swells
(1)
The Supply voltage swell shall comply with Table given below and are specified with reference to:
i.
Number of events per year
ii.
Event duration (t)
iii.
Swell Voltage (u)
iv.
Declared voltage (Uc)
Table 5: Supply Voltage swell Limits for LV and MV Networks in
Terms of Number of Events per Year
Swell
Voltage
u
(%)
Duration t (ms)
10 ≤ t ≤ 500
500 < t ≤ 5000
5000 < t ≤ 60000
u ≥ 120
--
--
--
120 > u ≥ 110
--
--
--
Values may be as per relevant IEC/IEEE Standard
Provided that:
The voltage swell shall be measured in accordance with IEC 61000-4-30 and shall not fall
outside the duration from 10 ms up to and including 1 min;
The voltage swell shall be measured in all phases of supply.
5.6
Voltage Harmonics
(1)
The voltage harmonic distortion of the supply voltage shall be assessed in terms of the Total Harmonic
Distortion (THDV) considering harmonic components up to the 50th order. THDV shall be taken as
square root of the sum of squares of all voltage harmonics expressed as a percentage of the magnitude
of the fundamental measured with following formula: -
N
THDV = √∑ V2h
(h=2)
Where,
Vh represents the percent rms value of the hth harmonic voltage component,
and N represents the highest harmonic order considered in the calculation.
The distribution licensee shall control the value of THDV measured at Point of Common
Coupling (PCC) for LV and MV network to less than or equal to 8% and 5% respective for 100% of
time.
The Distribution licensee shall also control the mean rms values of each individual harmonic
order component to the values as given in table below:
Fundamental Voltage
Odd Harmonics (%)
Even
Harmonics
(%)
Not Multiple of 3
Multiple of 3
Harmonic
LV
MV
harmonic
LV
MV
harmonic
LV
MV
5
6
6
3
5
5
2
2
1.9
7
5
5
9
1.5
1.5
4
1
1
11
3.5
3.5
15
0.5
0.5
6 to 24
0.5
0.5
13
3
3
21
0.5
0.5
17
2
2
19
1.5
1.5
23
1.5
1.5
25
1.5
1.5
PART III]
HARYANA GOVT. GAZ., MAY 12, 2020 (VYSK. 22, 1942 SAKA)
211
(2)
For statistical evaluation, voltage harmonics shall be assessed for the period not less than 7 continuous
days. The short time 10 min values are accumulated over periods of one week and the 95th percentile
values (i.e., those values that are exceeded for 5% of the measurement period) are calculated for each 7-
day period for comparison with the recommended limits. The values are measured at PCC in normal
operating condition. Provided that:
The limits of each individual voltage harmonics by the distribution licensee in its electricity system,
point of harmonic measurement i.e. Point of Common Coupling (PCC), method of harmonic
measurement and other matters shall be in accordance with per applicable notified IS and in absence of
IS, the IEEE 519-2014 namely ‘IEEE Recommended Practices and Requirements for Harmonic Control
in Electrical Power Systems', as modified from time to time.
5.7
Current Harmonics
(1)
The designated customers shall limit the value of harmonic currents measured at Point of Common
Coupling (PCC) measured over 10 minutes period to the values as given in table below:
Table 7: Values of Current distortion limits (TDD)
Maximum harmonic current distortion in percent of IL
Individual harmonic order (odd harmonics) a, b
ISC/IL
3 ≤ h
<11
11≤ h < 17
17 ≤ h < 23
23 ≤ h < 35
35 ≤ h ≤ 50
TDD
< 20*
4.0
2.0
1.5
0.6
0.3
5.0
20 < 50
7.0
3.5
2.5
1.0
0.5
8.0
50 < 100
10.0
4.5
4.0
1.5
0.7
12.0
100 < 1000
12.0
5.5
5.0
2.0
1.0
15.0
> 1000
15.0
7.0
6.0
2.5
1.4
20.0
Note: * All power generation equipment is limited to these values of current distortion, regardless of actual ISC/IL;
A
Even harmonics are limited to 25% of the odd harmonic limits above;
B
Current distortions that result in a dc offset, e.g., half-wave converters, are not allowed;
where
Isc = maximum short-circuit current at PCC;
IL = maximum demand load current (fundamental frequency component);
(2)
For statistical evaluation, current harmonics shall be assessed for the period not less than 7
continuous days. The short time 10 min values are accumulated over periods of one week and the
95th and 99th percentile values (i.e., those values that are exceeded for 5% and 1% of the
measurement period) are calculated for each 7-day period for comparison with the recommended
limits. The values of TDD are measured at PCC in normal operating condition.
Provided that:
The weekly 95th percentile short time 10 min harmonic current values should be less than
the value given in above Table-7. However, the weekly 99th percentile short time 10 min harmonic
current values should be less than 1.5 times the value given in above Table-7.
The limits of current harmonics injected by the designated customer, point of harmonic
measurement i.e. Point of Common Coupling (PCC), method of harmonic measurement and other
matters shall be in accordance with per applicable notified IS and in absence of IS, the IEEE 519-
2014 namely ‘IEEE Recommended Practices and Requirements for Harmonic Control in Electrical
Power Systems', as modified from time to time. The measurements undertaken to determine
compliance shall be carried out in accordance with the requirements as specified in IEC 61000-4-7
and IEC 61000-4-30.
5.8
Short Supply Voltage Interruptions
(1)
Short voltage interruptions shall comply with Table given below and are specified with reference to:
i.
Number of events per year
ii.
Event duration (t)
HARYANA GOVT. GAZ., MAY 12, 2020 (VYSK. 22, 1942 SAKA)
PART III]
212
iii.
Declared voltage (Uc)
Table 8: Short Voltage Interruptions Limits (number of events per year) for LV and MV Networks.
Residual
Voltage
(%)
Duration t
(ms)
10 ≤ t ≤ 200
200 < t ≤ 500
500 < t ≤ 1000
1000 < t ≤
5000
5000 < t ≤
60000
5 > u
5
20
30
10
10
Provided that:
The short voltage interruptions shall be measured in accordance with IEC 61000-4-30 and
shall not fall outside the duration from 10 ms up to and including 1 min;
The voltage swell shall be measured in all phases of supply.
5.9
Long or Sustained Supply Voltage Interruptions
(1)
The Distribution Licensee shall calculate the reliability of its distribution system on the basis of number
and duration of sustained or long supply voltage interruptions (longer than 3 min) in a reporting period,
using the following indices:
i.
System Average Interruption Frequency Index (SAIFI);
ii.
System Average Interruption Duration Index (SAIDI);
(2)
The Indices shall be computed for the distribution licensees for each month for all the 11kV and 33kV
feeders in the supply area, and then aggregating the number and duration of all interruptions in that
month for each feeder. The Indices shall be computed using the following formulae:
N
∑ Ai*Ni
i=1
SAIFI= ______________________
Ni
N
∑ Bi*Ni
i=1
SAIDI= ______________________
Ni
Where,
Ai = Total number of sustained interruptions (each longer than 3 min) on ith feeder for the month;
Bi = Total duration in minutes of all sustained interruptions (longer than 3 min) on ith feeder for the
month;
Ni = Number of Customers on ith feeder affected due to each sustained interruption; Nt = Total
number of customers served by the Distribution Licensee in the supply area;
n = number of 11kV and 33kV feeders in the licensed area of supply;
(3)
The distribution licensee shall maintain the reliability on monthly basis within the limits specified in
table below:
Table 9: Limits for Reliability indices
Reliability
Indices
Limits *
SAIDI
600 Minutes per customer
SAIFI
15 interruptions per customer
*Limits may be decided based on area on supply and local conditions by SERC.
PART III]
HARYANA GOVT. GAZ., MAY 12, 2020 (VYSK. 22, 1942 SAKA)
213
Provided that:
The feeders must be segregated into rural and urban and the value of the indices must be
reported separately for each month.
While calculating the given reliability indices, the following types of interruptions shall not
be taken into account:
i.
Momentary outages of duration less than three minutes.
ii.
Outages due to Force Majeure events such as cyclone, floods, storms, war, mutiny, civil
commotion, riots, lightning, earthquake, lockout, grid failure, fire affecting licensee’s
installations and activities;
iii.
Outages that are initiated by the National Load Despatch Centre/ Regional Load Despatch
Centre/State Load Despatch Centre during the occurrence of failure of their facilities;
While calculating the given reliability indices, the interruptions due to scheduled or
planned outages shall be taken into account.
The distribution licensee shall capture reliability indices data directly from the feeder
monitoring system and there should not be any manual interventions as far as possible.
The Distribution Licensee shall maintain data on the reliability indices specified above
for each zone/circle/division/sub-division on a monthly basis.
The Distribution Licensee shall put up, at the end of each month, such monthly
information on reliability indices, on website of the Distribution Licensee and shall submit such
report quarterly to the Commission
MONITORING AND REPORTING OF THE POWER QUALITY
5.10
Monitoring of Power Quality
(1)
PQ measurement shall be implemented in phased manner and during first phase, PQ meters shall
be installed at selective representative locations based on voltage level, type of consumers and
significance of the power quality in such a way that such measurements should adequately
represent the Power Quality and Reliability in the area of supply.
(2)
The distribution licensee for the purpose of requirements for the quality of electricity supplied
shall identify the locations of 33kV/11kV feeders, Distribution Transformers (DTRs) and
designated customers to ensure the measurement of the power quality parameters at sufficient
locations in their electrical networks to adequately characterize and report performance in terms
of these Regulations. The feeders and DTRs should be identified for PQ monitoring based on
type of load connected. The utilities shall prepare blue print for implementation of the above and
submit the same to the commission within three months.
(3)
The distribution licensee shall enforce the continuous monitoring of power quality standards at
the inter-connection point of identified locations at or below 33kV voltage level for development
of profile of power quality measurement in the area of supply;
(4)
In the first phase, the distribution licensee(s) shall install Power Quality meters at 5 locations
each in their area of supply on pilot basis covering the 11 KV/33KV feeders, the DTs and
designated customers with load more than 1MW and scale up there-after in consultation with the
commission.
(5)
The measurements undertaken to determine compliance shall be carried out in accordance with
the requirements as specified in IEC 61000-4-7 and IEC 61000-4-30. There shall be continuous
metering of harmonics with permanent Power Quality meters complying with the IEC 61000-4-
30 Class-A meters for all new installations/connections of identified locations. For existing
installations/ connections at identified locations where CTs/PTs are of lower accuracy class than
mandated by IEC 61000-4-30 Class-A meters, the meters complying with the IEC 61000-4-30
Class-B may be installed. These meters should be capable of detecting direction of Harmonics
(whether it is upstream or downstream) for all new installations at identified locations.
(6)
In the event when the distribution licensee receives a customer complaint concerning Power
Quality, the distribution licensee shall deploy power quality meter for a particular period for the
purpose of verification. Distribution licensee can also measure the level of harmonics generation
at PCC of any consumer(s) on receipt of complaint(s) from other affected consumer(s).
(7)
These Regulations specifies the minimum requirements for Power Quality meters for
measurement at sites directly affecting the quality of the power supplied to the consumer(s). The
HARYANA GOVT. GAZ., MAY 12, 2020 (VYSK. 22, 1942 SAKA)
PART III]
214
distribution licensee may require the additional PQ meters to establish the power quality at other
bulk supply points and at other major network nodes and to investigate consumer(s) complaints,
for which these additional PQ meters may be installed temporarily.
(8)
The distribution licensee may opt to integrate the smart grid meters compatible for measurement
of the PQ parameters for economic and operational optimization.
5.11
Compliance of the Power Quality and Reliability Standards
(1)
The distribution licensee shall submit the quarterly report of information collected on PQ
parameters extracted from power quality meters and machine-based reliability data in standard
formats (as specified separately) to the Commission.
(2)
It shall be the prime responsibility of the distribution licensee to comply with these Regulations
and submit the compliance report every 6 months in standard formats (as specified separately),
including transparent data disclosure regarding electrical system, to the Commission. The
Commission may direct designated agencies to be notified separately, to carry out PQ audit on
the basis of compliance reports filed by distribution licensee for verification. The distribution
company shall carry out 100% audit once a year and 5% random audit by independent agency
and shall file the audit report along with ARR petition.
(3)
The distribution licensee shall publish the reports indicating the compliance with the standards
under these Regulations and post all the reports on its website. The distribution licensee shall
also seek comments, if any, on the same from the customers availing supply from the
distribution licensee.
(4)
The Commission from time to time may seek reports on PQ improvements from distribution
licensee.
(5)
The distribution licensee shall make efforts to improve power quality in their supply area by
deploying devices to mitigate power quality issues such as filters or controllers etc. The
expenses incurred towards deploying these devices by the distribution licensee shall be
considered in the ARR.
(6)
The distribution companies shall ensure the data security and the data should only be used for
identified purpose and should not be transferred to any other person without the consent of the
specific consumer.
INCENTIVE / DIS-INCENTIVE MECHANISM FOR POWER QUALITY
5.12
Incentive/dis-incentive mechanism for Power Quality
(1)
During the first year after notification of Power Quality Regulations, there shall be monitoring
and reporting of power quality parameters by distribution licensee in prescribed standard formats
at regular intervals. Therefore, there shall not be any incentive/dis-incentive for the stakeholders
during the first year after notification or as may be specified by SERCs.
(2)
The expenses incurred towards implementation and monitoring of power quality parameters by
the distribution licensee shall be considered in the ARR.
(3)
From the second year after notification of PQ Regulations, an incentive/dis-incentive
mechanism shall be implemented for distribution licensees and for designated customers. The
distribution licensees or designated customers shall be liable to pay compensation. Provided that
the Distribution Licensee shall compensate the affected person(s) in second- next billing cycle.
In case the Distribution Licensee fails to pay the compensation or if the affected person is
aggrieved by non-redressal of his grievances, he may make a representation for the redressal of
his grievance to the concerned Consumer Grievance Redressal Forum:
Provided further that such compensation shall be based on the classification of such
failure as determined by the Commission and the payment of such compensation shall be made
or adjusted in the consumer’s future bills (issued subsequent to the award of compensation)
within thirty (30) days of a direction issued by the Forum or by the Ombudsman, as the case
may be.
(3)
The Distribution Licensee shall not be excused from failure to maintain the power quality
parameters under these Regulations, where such failure can be attributed to negligence or
deficiency or lack of preventive maintenance of the distribution system or failure to take
reasonable precaution on the part of the Distribution Licensee.
(4)
The designated customers shall be liable to pay compensation for injecting current harmonics in
to the supply system beyond the specified limits as given in Table below. In case the designated
PART III]
HARYANA GOVT. GAZ., MAY 12, 2020 (VYSK. 22, 1942 SAKA)
215
customer does not take measures to reduce the level of current harmonics (which is measured in
terms of total demand distortion), he shall be made liable to pay higher compensation
progressively on each continued violation as decided by the Commission separately. When there
is no improvement in power quality even after 6 months, such consumers shall be served notice
of dis-connection from the supply network and shall be disconnected after approval of the
Commission.
(5)
Level of compensation payable for failure to meet power quality standards are given in table
below:
Level of compensation
PQ Parameter Standard
Compensation Payable
Compensation
Payable by
Voltage
Variation
As per Table-1,
2 and 3
Rs.100/- per week or part thereof for
which voltage variation was beyond
the specified limits
Distribution
Licensee to each
consumer
connected on
the feeder/
designated
DTR.
These
compensations shall
be cumulative for
each violation.
Voltage
unbalance
Rs.100/- per week or part
thereof for which voltage unbalance
was beyond the
specified limits
Voltage dips or
swells
Number
of
events per year
as per
Table- 4 and 5
Rs.50/- per event for which
voltage dips or swell was
beyond the specified limits
Voltage
Harmonics
for LV for MV
and as per Table
- 6
Rs.100/- per week or part
thereof for which voltage harmonics
was beyond the
specified limits
Current
Harmonics
As per Table-7
Compensation shall be 50
paisa per unit for the duration for
which
current
harmonics
was
beyond the
specified limits.
Designated
Customer
to
distribution licensee
Short
Voltage
Interruptions
Number
of
events per year
as per Table- 8
Rs.50/- per instance for
which voltage dips or swell was
beyond the specified
limits
Distribution
Licensee to each
consumer
connected on the
feeder/ designated
DTR.
These
compensations shall
be cumulative for
each violation.
Long
Supply
Voltage
Interruptions
SAIDI
in
Minutes
per
Customer as per
Table- 9
5 paisa/min/kW of contract demand
for which SAIDI was beyond the
specified
limits
Long
Supply
Voltage
Interruptions
SAIFI
in
interruption per
customer as per
Table- 9
Rs.50/- per interruption for which
SAIFI was beyond the specified
limits
Provided that such compensation as given in above Table-10 shall not be claimed in ARR by
distribution licensee and further the compensation received by the distribution licensee from the
designated customers shall be utilized only on the measures taken to improve power quality such as
installation of filters, controllers etc.;
HARYANA GOVT. GAZ., MAY 12, 2020 (VYSK. 22, 1942 SAKA)
PART III]
216
Provided further that the compensation payable under these Regulations shall be recovered from
the officers concerned of the distribution licensees and the same should also be necessarily reflected in
the ACRs of the erring officers / officials for their relevant year.
6.
Restoration of Power Supply
6.1
Restoration of supply on failure
(i) The Distribution Licensee, within two hours of receipt of complaint shall inform the
complainant about the likely time to be taken for restoration of supply.
(ii) The Distribution Licensee shall restore the power supply in the case of normal fuse-off calls
within four (4) hours in urban areas and within eight (8) hours in Rural Areas of the receipt of a
complaint.
(iii) The Distribution Licensee shall, in the case of 33 kV/ 11 kV/ 415 V/230 V overhead line
breakdowns, restore the power supply to the consumer within eight (8) hours in urban areas and
within sixteen (16) hours of the receipt of a complaint in rural areas. However, in case break
down is due to broken pole, power supply to the consumer shall be restored within twelve (12)
hours in urban areas and within twenty-four (24) hours of the receipt of a complaint in rural
areas.
(iv) The Distribution Licensee shall restore the power supply caused by underground cable faults
including service connection within twenty-four (24) hours in urban area and rural areas after
obtaining the necessary clearances, if any.
(v) The Distribution Licensee shall restore the power supply caused by distribution transformer
failure within twenty-four (24) hours in urban areas and within forty-eight (48) hours of the
receipt of a complaint in rural areas. Licensee shall also maintain the transformer damage rate
below 3% p.a. in urban area and 6% p.a. in rural area.
(vi) The Distribution Licensee shall restore the power supply caused by major power failure
involving Power Transformer/Equipment etc within seven (7) days on receipt of a complaint.
Till than the Licensee shall ensure alternate arrangement to restore the supply to the affected
area within 24 hours wherever technically feasible.
6.2
Scheduled Outages
The period of interruption, as a result of any scheduled outage, shall be specified in the public notice
and may also be informed through SMS at least 24 hours in advance of such scheduled outage.
Provided that such scheduled outage shall not normally exceed eight (8) hours on any day and supply
shall preferably be restored by 6:00 PM in the evening.
6.3
Unscheduled Load Shedding
The period of interruption as a result of any unscheduled outage shall not normally exceed four (4)
hours on any day in a particular area subject to safety of the Grid.
6.4
Disconnection of supply
(i)
The Distribution Licensee shall disconnect the supply on receipt of request for disconnection
within twenty four (24) hours from the receipt of application.
(ii)
The Distribution Licensee shall intimate the consumer of any amount outstanding against the
consumer whose supply has been disconnected within seven (7) days from the date of
disconnection. “No- Dues certificate” shall be issued by the Distribution Licensee within thirty
(30) days from the date of application and payment of outstanding dues.
(iii)
In case of closure of account (permanent disconnection), refund of credit amount (if any),
advance consumption deposits / consumption security and meter security shall be made by the
Distribution Licensee within thirty (30) days from the date of application for closure of account.
6.5
Reconnection of supply following disconnection due to non-payment of bills
Where the Distribution Licensee has disconnected supply to a consumer for a period of not more than
six months, then if such consumer pays all amounts due and payable by him to the Distribution
Licensee or, in case of a dispute, pays such amount under protest, the Distribution Licensee shall
reconnect supply within—
(i)
six (6) hours from the payment of dues by the consumer in urban areas;
(ii)
twelve (12) hours from the payment of dues by the consumer in rural areas.
PART III]
HARYANA GOVT. GAZ., MAY 12, 2020 (VYSK. 22, 1942 SAKA)
217
Provided that, where the period of disconnection exceeds six months, an application for
reconnection of supply shall, after either payment of amounts due or upon settlement of dispute, be
treated as a fresh application for supply of electricity under the provisions of the Act.
Payments made under protest in these Regulations shall be in accordance with the requirements
of the proviso to sub-section (1) of Section 56 of the Act.
7.
Metering
7.1
The Distribution Licensee shall perform the meter related activities in accordance with the Electricity
Supply Code, Regulations, 2014 read with amendment thereto, in force from time to time and also in
accordance with other allied Regulations and Codes.
7.2
The Distribution Licensee shall inspect and check the correctness of the meter within three days of
receiving the request or complaint.
7.3
Licensee shall replace the non-working (stuck up, running slow, fast or creeping) meter within three
days in urban areas and seven days in rural areas after its being so established on checking.
7.4
The Distribution Licensee shall restore the power supply caused by a burnt meter as per the procedure
and timelines stipulated under Electricity Supply Code, Regulations, 2014, and its amendments thereof.
7.5
The Distribution Licensee shall ensure that at no point of time the percentage of defective meters to the
total number of meters in service exceeds 2%:
Provided in case of new connection is not released within the timeline specified in supply code,
the officer/official responsible shall be penalized @Rs. 1000 per day of delay subject to maximum of
Rs. 10000. Thereafter the matter shall be brought before the Commission.
8.
Complaints about Consumer’s Bills
8.1
The Distribution Licensee shall immediately acknowledge a consumer’s complaint by providing unique
complaint number, if the complaint is filed / lodged in person or telephonically and within seven (7)
days if the complaint is received by post.
8.2
The Distribution Licensee shall resolve consumer complaints with regard to non-receipt of a bill for
payment or inadequate time being made available for payment thereof or otherwise, within twenty-four
(24) hours of the receipt. In other cases where additional information is required, the complaint shall be
resolved within seven (7) days.
8.3
Licensee shall ensure that at any point of time the percentage of bills requiring modifications following
complaints to the total number of bills issued does not exceed 0.1% :
Provided that in case a wrong electricity bill for sale of power is issued by the licensee, the same
shall be corrected and a revised bill shall be issued to the consumer by the SDO in-charge within 3
days. Further, the adjustment of any amount on account of correction made in the bill shall be reflected
in the next bill. In case the future bill (the second bill after the correction of the wrong bill), is found to
be wrong the SDO in-charge shall be liable to pay a penalty of Rs 500/- per default. Provided further in
case such default is found to occur thrice, the defaulting officer shall be proceeded under the
Punishment and Appeal Rules for this act of omission.
9.
Compliance of Orders passed by the CGRF and Electricity Ombudsman
The Distribution Licensee, unless and otherwise stayed by court/forum of competent jurisdiction shall
implement the decision rendered by the CGRF or the Electricity Ombudsman within the period stipulated in such
Order.
10.
Complaint Registration and Complaint Handling
10.
1Establishment of Call centre(s)
(i)
The Distribution Licensee within the following time limits, from the date of commencement of
these Regulations, establish/strengthen the Call Centre facility(s) for redressal of complaints of
its consumers. Access to such Call Centre facilities shall be established to its consumers round
the clock (24x7) during all days of the week: -
(a)
for “Urban Areas” within two (2) months; and
(c)
for “Rural Areas” within three (3) months.
(ii)
The Distribution Licensee shall use the existing channels for recording the consumer complaints
as per the specified procedure till the establishment of Call Centre(s).
(iii)
Every Distribution Licensee shall ensure that sufficient number of persons are at the disposal of
the Call centre(s) and also earmark or allot or establish a basic telephone or cellular mobile
HARYANA GOVT. GAZ., MAY 12, 2020 (VYSK. 22, 1942 SAKA)
PART III]
218
telephone number having sufficient communication lines or connections to be called as the “toll
free number” or “consumer care number” or “help line number” as the case may be, at Call
centre(s). The call response time shall not be more than three (3) minutes and the registration of
consumer call after the first response shall be completed in five (5) minutes. Any delay shall
attract compensation as specified in Schedule-I.
(iv)
The Commission, at any point of time, may review the adequacy of the complaint handling
centre(s) set-up by the Distribution Licensee and direct the Distribution Licensee to establish
additional center(s) in the area not being adequately served.
(v)
The call charges or short message service charges shall not be levied upon, or made payable by
the consumers, for calls made, or, short messages sent, to the “ toll free number ” or “ consumer
care number ” or “ help line number ”, as the case may be.
(vi)
Every Distribution Licensee shall, immediately upon establishment of Call Centre(s), inform
through a public notice in newspapers in circulation in the area of supply, by uploading on
internet website of the Distribution Licensee and should also ensure proper circulation of
information to the consumers in case of any changes in the contact numbers.
(vii)
The Distribution Licensee shall ensure the availability of electronic data base to record the
complaints, redressal time, feedback from consumers etc. which will help in finalization of
compensation and reporting of the performance to the Commission.
(viii) The Distribution Licensee shall convey information about the name of office(s), address(es) and
telephone numbers wherein the consumer can lodge the complaints, in the form of additional
information printed on the electricity bills and shall also display it at the sub-division offices and
on the internet website of that Distribution Licensee.
10.2
Process of handling complaints
(i)
The Distribution Licensee shall devise its own processes at Complaint Handling Centers / Call
Centre(s) / Customer Care Centre(s) / Service Centre(s) or any other customer interface channels
to handle consumer complaints.
(ii)
The Distribution Licensee shall register all complaint made by a consumer (either verbally or in
writing) in a manual register or in electronic format to be maintained for this purpose. The
complaints shall be recorded in the approved format. The Distribution Licensee shall allot a
unique identification number to each complaint which shall be duly communicated to the
consumer along with the expected complaint resolution time.
(iii)
The Distribution Licensee shall intimate contact details of the next higher authority (including
his name, telephone number and address) to the consumer in case the consumer is not satisfied
with the complaint handling or when requested by him.
(iv)
The Distribution Licensee shall update and record feedback of the consumer on the action taken
along with the total time taken for resolution of the complaint.
11.
Reliability Indices
11.1 The Distribution Licensee shall calculate and report the following reliability indices of its distribution
system separately for 11 kV feeders and consumers, covering all cities and towns up to the District
Headquarter towns and also for rural areas: -
(i)
System Average Interruption Frequency Index (SAIFI);
(ii)
System Average Interruption Duration Index (SAIDI); and
(iii)
Reliability Indices (RI) :
Provided that the above categorization should cover the whole area of the licensee and should
include all the 11kV feeders in its area of operation. Licensee shall also calculate and report the
Reliability Indices of agriculture feeders separately. The indices shall be computed as per the prescribed
formats annexed as Annexure-VI to VII.
11.2 The Distribution Licensee shall segregate all 11 kV feeders in its supply area into urban, rural and
agricultural tube well categories. The category shall comprise of all feeders where the agricultural load
exceeds 90% of the total load on the feeder.
11.3 The Distribution Licensee shall make concerted efforts to achieve the standards of reliability fixed by
the Commission from time to time.
11.4 The Distribution Licensee shall maintain data on the reliability indices specified in Regulation 11.1
above for each zone/circle/division/sub-division on a monthly basis.
PART III]
HARYANA GOVT. GAZ., MAY 12, 2020 (VYSK. 22, 1942 SAKA)
219
11.5 The Distribution Licensee shall post, at the end of each month, such monthly information on reliability
indices, on website of the Distribution Licensee and shall submit such report quarterly to the
Commission within 30 days after the expiry of respective quarter.
11.6 Based on the information submitted by licensees, the Commission shall notify annually the targeted
levels of these indices to be achieved by the Licensee. In the event, the Distribution Licensee
persistently neglects and fails to improve its performance, the Commission may take action against the
Distribution Licensee as per provision under Section 24 or any other provision of the Act.
12.
Exemptions
12.1 Standards of Performance specified in these Regulations shall remain suspended in case of the
following events and the Distribution Licensee is prevented from meeting his obligations under these
Regulations by-
(i)
force majeure events such as cyclone, floods, storms, pandemic, war, mutiny, civil commotion,
riots, lightning, earthquake, lockout, fire affecting Licensee’s installations and activities;
(ii)
outages due to generation failure or transmission network failure;
(iii)
outages that are initiated by the National Load Despatch Centre/ Regional Load Despatch
Centre/ State Load Despatch Centre during the occurrence of failure of their facilities;
(iv)
or other occurrences beyond the control of the Distribution Licensee;
Provided that the Distribution Licensee shall not be exempted from failure to maintain the
Standards of Performance under these Regulations, where such failure can be attributed to negligence
or deficiency or lack of preventive maintenance of the distribution system or failure to take reasonable
precaution on the part of the Distribution Licensee.
12.2 The Commission may, by general or special order, exempt the Distribution Licensee from any or all of
the standards specified in these Regulations for such period as may be specified in the said Order.
13.
Determination of Compensation
13.1 If the Distribution Licensee fails to meet the Guaranteed Standards of Performance as specified in
Schedule-I, Licensee shall pay compensation to the affected person;
Provided that any person who is affected by the failure of the Distribution Licensee to meet the
Standards of Performance specified under these Regulations and who seeks to claim compensation shall
file his claim with such a Distribution Licensee within a maximum period of thirty (30) days from the
time such a person is affected by such failure of the Distribution Licensee to meet the Standards of
Performance;
Provided further that the Distribution Licensee shall provide information to consumers with
regard to its offices/ competent authority to settle claims for compensation;
Provided further that the Distribution Licensee shall compensate the affected person(s) within a
maximum period of ninety (90) days from the date of filing his claim.
13.2 In case the Distribution Licensee fails to pay the compensation or if the affected person is aggrieved by
non-redressal of his grievances, he may make a representation for the redressal of his grievance to the
concerned Consumer Grievance Redressal Forum in accordance with the provisions of Haryana
Electricity Regulatory Commission (Consumer Grievances Redressal Forum and Electricity
Ombudsman) Regulations, 2004 including any amendment or revisit thereto;
Provided that in case the claim for compensation is upheld by the Consumer Grievances
Redressal Forum, the compensation determined by the Commission in Schedule-I to these Regulations
will be implemented by the Forum or by the Ombudsman, in case of an appeal filed against order of the
Forum before him and is to be paid by the concerned Distribution Licensee;
Provided further that such compensation shall be based on the classification of such failure as
determined by the Commission under the provisions of Section 57 of the Act and the payment of such
compensation shall be paid or adjusted in the consumer’s future bills (issued subsequent to the award of
compensation) within ninety (90) days of a direction issued by the Forum or by the Ombudsman, as the
case may be.
14.
Information with respect to Level of Performance
14.1 The Distribution Licensee shall submit the information to the Commission on the matters covered under
clauses (a) and (b) of sub-section (1) of Section 59 of the Act on quarterly basis, within a period of
thirty (30) days from the end of the quarter in the forms shown in Annexure I to Annexure-VII and put
up such information on the internet website of the Distribution Licensee, within a period of thirty days
HARYANA GOVT. GAZ., MAY 12, 2020 (VYSK. 22, 1942 SAKA)
PART III]
220
from the end of the quarter. The consolidated yearly information shall also be supplied at the end of
each financial year by the 15th May of prospective year;
Provided that the information shall be with respect to the total number of cases of failure to meet
each of the standards specified in these Regulations;
Provided further that the Distribution Licensee shall separately state the total number of cases
where compensation has been paid by it without dispute and the total number of cases where
compensation has been paid in compliance with an order or direction of the Forum or Ombudsman,
along with the total amount of compensation in each category;
Provided further that Distribution Licensee shall intimate the measures taken by Licensee to
improve performance in the areas of his License;
14.2 The Commission may authorize its Officers or any independent agency(s) to conduct annual checks, in
order to monitor the compliance of the standards of performance by the Distribution Licensee(s) and
submit a report to the Commission.
15.
Power to give direction
The Commission may, from time to time, issue directions and orders as considered appropriate for
implementation of these Regulations.
16.
Power to relax
The Commission may by general or special order, for reasons to be recorded in writing, may relax any of the
provisions of these Regulations.
17.
Power to Remove Difficulties.
If any difficulty arises in giving effect to the provisions of these Regulations, the Commission may, by general
or specific order, make such provisions not inconsistent with the provisions of the Act, as may appear to be necessary
for removing the difficulty.
18.
Power to Amend
The Commission may at any time, add to, vary, alter, modify or amend any provisions of these Regulations
after following due process including affording an opportunity to the stakeholders / public.
19.
Repeal and Saving
19.1
The “Haryana Electricity Regulatory Commission (Standards of Performance of Distribution
Licensees) Regulations, 2004” issued vide Regulation No. HERC/04/2004 and notified on 16th July,
2004 including the amendments thereof issued subsequently are hereby repealed.
19.2
Notwithstanding the repeal anything done or any action taken or purported to have been done or taken
under the repealed regulations, in so far as it is not inconsistent with the provisions of the Act or rules
and regulations made there under, shall be deemed to have been taken under these Regulations.
By Order of the Commission
(Sd.)…,
Secretary,
Haryana Electricity Regulatory Commission.
PART III]
HARYANA GOVT. GAZ., MAY 12, 2020 (VYSK. 22, 1942 SAKA)
221
Schedule-I
Guaranteed Standards of Performance
Sr. No.
Nature of Service
Standard (Including Time Limit for
rendering Service)
Compensation
Payable
1
Response time for the consumer call
Maximum 3 minutes
Rs. 50 in each
case of default
2
Registration of consumer call and issue of
complaint number
Within 5 minutes
Rs. 50 in each
default
3
Normal fuse-off
Urban Area
Within 4 hrs
Within 2 hrs. of
receipt of
complaint,
complainant
shall be
informed about
the likely time
to be taken for
restoration of
supply if asked
for by the
complainant
Rs. 100 per day
or part thereof in
case of delay to
each affected
consumer.
Rural Area
Within 8 hrs
4
Line
Break
Down
Urban Area
Within 8 hrs (12
hrs. if pole gets
broken)
Rural Area
Within 16 hrs (24
hrs. if pole gets
broken)
5
Underground
Cable fault
Urban Area
Within 48 hrs after
obtaining necessary
clearances
Rural Area
Within 48 hrs after
obtaining necessary
clearances
6
Distribution
Transformer
Failure
Urban Area
Within 24 hrs
Rs. 100 per day
or part thereof in
case of delay to
each affected
consumer.
Subject to
maximum of
Rs.3000/- to all
affected
consumers
combined.
Rural Area
Within 48 hrs
7
Major Power
Failure
involving Power
Transformer/
Equipment etc.
Urban Area
Within 7 days
Alternate
arrangement to
restore the supply to
the affected area to
be made within 24
hrs. wherever
technical feasible.
Rural Area
HARYANA GOVT. GAZ., MAY 12, 2020 (VYSK. 22, 1942 SAKA)
PART III]
222
8
Un-scheduled
load Shedding
Not to exceed 4hrs on any day.
Rs. 100 per day
or part thereof in
case of delay to
each affected
consumer
9
Period of
Scheduled outage
Maximum duration at
a stretch
Not to exceed 8
hours on any day
Consumers to
be informed
through public
notice at least
24 hours in
advance
Rs. 100 per day
or part thereof in
case of delay to
each affected
consumer
Restoration of Supply
By 6:00 PM in the
evening.
10
Meter
Complaints
Inspect and check
correctness
Within 7 days of receipt of
request/complaint along with the
requisite fee.
Rs. 100 per day
or part thereof in
case of delay.
Replace slow/ fast
meters/ creeping or
stuck meters
Within 7 days after its being so
established on checking
Replace burnt meters
The burnt meter should be replace
within 24 hours subject to maximum
of 72 hours as per Supply Code
Regulation 5.8
Rs. 100 per day
or part thereof in
case of delay.
11
Application for
new connection/
Additional load/
reduction in load
Inspection of
applicants’ premises
Within 7 days of receipt of application
complete in all respect along with
prescribed charges
Rs. 200 per day
or part thereof in
case of delay
subject to Section
44 of the Act.
Issue of demand notice
No. of days from the date of
inspection of premises.
(a) 7 days in case supply to be
extended from existing network
(b) In case extension/ augmentation of
existing network is required.
i. within 7 days in case of LT supply;
ii. within 14 days in case of 11 kV
supply;
iii. within 20 days in case of HT at 33
kV supply;
iv. within 25 days in case of supply
above 33 kV;
(c) 7 days in case of reduction of load.
PART III]
HARYANA GOVT. GAZ., MAY 12, 2020 (VYSK. 22, 1942 SAKA)
223
Release of Supply on
compliance of demand
notice and receipt of
payment
No. of days after the compliance of
demand notice.
i. within 23 days in case of LT supply;
ii. within 57 days in case of 11 kV
supply;
iii. within 77 days in case of HT at 33
kV supply;
iv. within 142days in case of supply
above 33 kV;
v. with in 7 days where no change in
CT, PT or any other equipment is
required. Provided in case the
CTs/PTs/ Transformers etc. are to be
replaced then time lines as in case of
extension of load shall be applicable.
12
Release of
Temporary
Connection
Inspection of
applicants’ premises
Within 7 days of receipt of application
complete in all respect along with
prescribed charges
Rs. 200 per day
or part thereof in
case of delay
subject to
Section 44 of
the Act.
Issue of demand notice
No. of days from the date of
inspection of premises.
(a) 7 days in case supply to be
extended from the existing network
(b) in case extension/ augmentation of
existing network is required.
i. within 7 days in case of LT supply;
ii. within 14 days in case of 11 kV
supply;
iii. within 20 days in case of 33 kV
supply;
iv. within 25 days in case of supply
above 33 kV;
In case connection not feasible
technically, applicant shall be
informed within 7 days in case of LT
and 15 days in case of HT, giving
reasons for the same.
Release of Supply on
compliance of demand
notice and receipt of
payment
No. of days after the compliance of
demand notice.
(a) 5 days in case supply to be
extended from the existing network
(b) in case extension/ augmentation of
existing network is required.
i. within 30 days in case of LT supply;
iii. within 90 days in case of HT
supply upto 33 kV;
iv. within 180 days in case of HT
supply above 33 kV;
13
Change of Name
Approval and
intimation of charges
Within 7 days of receipt of application
complete in all respect along with
prescribed charges
Rs. 100 per day
or part thereof in
case of delay.
HARYANA GOVT. GAZ., MAY 12, 2020 (VYSK. 22, 1942 SAKA)
PART III]
224
Effecting of change of
name
Within two billing cycle after
acceptance of application.
14
Reclassification of
consumer category/
change of tariff
category
Inspection of
applicants’ premises
Within 7 days of receipt of application
complete in all respect along with
prescribed charges
Rs. 100 per day
or part thereof in
case of delay.
Issue of demand notice
(a) 7 days in case supply to be
extended from existing network
(b) in case extension/ augmentation of
existing network is required.
i. within 7 days in case of LT supply;
ii. within 14 days in case of 11 kV
supply;
iii. within 20 days in case of 33 kV
supply;
iv. within 30 days in case of supply
above 33 kV;
Effecting of
reclassification/change
in category
From the date of inspection and after
compliance of demand notice and
issue of service connection order.
15
Redressal of
consumer’s
complaint
regarding billing
i.e. non receipt,
wrong bill, etc.
In case requires no
additional information
Within 24 hours of receipt of
Complaint
Rs. 50 per hour or
part thereof in
case of delay.
If additional
information is required
Within 7 days of receipt of Complaint
Rs. 100 per day
or part there of
delay
16
Reconnection of
Supply following
disconnection due
to nonpayment of
bills
(disconnection less
than 6 months old)
Urban Area
Within 6 hours of receipt of payment
from consumer
Rs. 100 per day
or part thereof in
case of delay.
Rural Areas
Within 12 hours of receipt of payment
from consumer
17
Refund of Advance Consumption
Deposit/ Consumption Security, meter
Security on closure of account
Within 30 days of adjustment of all
dues.
Rs. 100 per day
or part there of
delay in addition
to interest @18 %
p.a. on the
security.
18
Shifting of meter/
Service
connection/
Lines/
Equipments
Inspection of
applicants’ premises
Within 7 days of receipt of application
complete in all respect along with
prescribed charges
Rs. 200 per day
or part there of
delay
PART III]
HARYANA GOVT. GAZ., MAY 12, 2020 (VYSK. 22, 1942 SAKA)
225
Issue of demand notice
No. of days from the date of
inspection.
(a) 7 days in case supply to be
extended from existing network
(b) in case extension/ augmentation of
existing network is required.
i. within 7 days in case of LT supply;
ii. within 14 days in case of 11 kV
supply;
iii. within 20 days in case of 33 kV
supply;
iv. within 25 days in case of supply
above 33 kV;
Shifting of meter/
Service Connection
Within 7 days after receipt of
necessary charges and clearances.
Shifting of LT/ HT
Lines
Within 20 days after receipt of
necessary charges and clearances.
Shifting of Transformer Within 30 days after receipt of
necessary charges and clearances.
19
Issue of No Dues Certificates
Within 2 days from the date of
application and clearance of
outstanding dues, if any.
Rs. 100 per day
or part thereof in
case of delay
20
Compliance of Orders pronounced by
CGRF and Electricity Ombudsman
Within the time frame defined in such
order or the regulations specified by the
Commission in this regard.
Rs. 100 per day
or part there of
delay
Note: - Maximum penalty shall be limited to Rs. 10,000.00/- in each case.
HARYANA GOVT. GAZ., MAY 12, 2020 (VYSK. 22, 1942 SAKA)
PART III]
226
Schedule-II
General/Overall Standards of Performance
Sr.No.
Nature of Service
Standard (Including Time
Limit for rendering Service)
Overall
Standards of
performance of
performance (%)
1
Response time for the consumer call
Maximum 3 minutes
99.0
2
Registration of consumer call and issue of
complaint number
Within 5 minutes
99.0
3
Normal fuse-off
Urban Area
Within 4 hrs
Within 2 hrs. of
receipt of
complaint,
complainant
shall be
informed about
the likely time
to be taken for
restoration of
supply if asked
for by the
complainant
99.0
Rural Area
Within 16 hrs
4
Line Break Down Urban Area
Within 8 hrs
(12 hrs. if pole
gets broken)
95.0
Rural Area
Within 16 hrs
(48 hrs. if pole
gets broken)
5
Underground
Cable fault
Urban Area
Within 48 hrs
after obtaining
necessary
clearances
Rural Area
Within 48 hrs
after obtaining
necessary
clearances
6
Distribution
Transformer
Failure
Urban Area
Within 24 hrs
95.0
Rural Area
Within 48 hrs
7
Major Power
Failure
involving Power
Transformer/
Equipment etc.
Urban Area
Within 7 days
Alternate
arrangement to
restore the
supply to the
affected area to
be made within
24 hrs.
wherever
technical
feasible.
PART III]
HARYANA GOVT. GAZ., MAY 12, 2020 (VYSK. 22, 1942 SAKA)
227
Rural Area
8
Un-scheduled
load Shedding
Not to exceed 4hrs on any day.
95.0
9
Period of
Scheduled outage
Maximum duration at a
stretch
Not to exceed 8
hours on any
day
Consumers to
be informed
through public
notice at least
24 hours in
advance
95.0
Restoration of Supply
By 6:00 PM in
the evening.
10
Meter
Complaints
Inspect and check
correctness
Within 7 days of receipt of
request/complaint along with the
requisite fee.
95.0
Replace slow/ fast meters/
creeping or stuck meters
Within 7 days after its being so
established on checking
Replace burnt meters
Within 72 hours of receipt of
complaint. However, supply
should be restored within 24 hrs
as per the provisions of
Electricity Supply Code.
11
Application for
new connection/
Additional load/
reduction in load
Inspection of applicants’
premises
Within 7 days of receipt of
application complete in all
respect along with prescribed
charges
98.0
Issue of demand notice
No. of days from the date of
inspection of premises.
(a) 7 days in case supply to be
extended from existing network
(b) In case extension/
augmentation of existing network
is required.
i. within 7 days in case of LT
supply;
ii. within 14 days in case of 11
kV supply;
iii. within 20 days in case of HT
at 33 kV supply;
iv. within 25 days in case of
supply above 33 kV;
HARYANA GOVT. GAZ., MAY 12, 2020 (VYSK. 22, 1942 SAKA)
PART III]
228
Release of Supply on
compliance of demand
notice and receipt of
payment
No. of days after the compliance
of demand notice.
i. within 23 days in case of LT
supply;
ii. within 57 days in case of 11
kV supply;
iii. within 77 days in case of HT
at 33 kV supply;
iv. within 142days in case of
supply above 33 kV;
Agriculture Pump Sets
As per Regulations
12
Release of
Temporary
Connection
Inspection of applicants’
premises
Within 7 days of receipt of
application complete in all
respect along with prescribed
charges
98.0
Issue of demand notice
No. of days from the date of
inspection of premises.
(a) 7 days in case supply to be
extended from the existing
network
(b) in case extension/
augmentation of existing network
is required.
i. within 7 days in case of LT
supply;
ii. within 14 days in case of 11
kV supply;
iii. within 20 days in case of 33
kV supply;
iv. within 25 days in case of
supply above 33 kV;
In case connection not feasible
technically, applicant shall be
informed within 7 days in case of
LT and 15 days in case of HT,
giving reasons for the same.
PART III]
HARYANA GOVT. GAZ., MAY 12, 2020 (VYSK. 22, 1942 SAKA)
229
Release of Supply on
compliance of demand
notice and receipt of
payment
No. of days after the compliance
of demand notice.
(a) 5 days in case supply to be
extended
from
the
existing
network
(b) in case extension/
augmentation of existing network
is required.
i. within 30 days in case of LT
supply;
iii. within 90 days in case of HT
supply upto 33 kV;
iv. within 180 days in case of HT
supply above 33 kV;
13
Change of Name
Intimation of charges
Within 7 days of receipt of
application complete in all
respect along with prescribed
charges
98.0
Effecting of change of
name
Within two billing cycle after
acceptance of application.
14
Reclassification of
consumer category/
change of tariff
category
Inspection of applicants’
premises
Within 7 days of receipt of
application complete in all
respect along with prescribed
charges
98.0
Issue of demand notice
(a) 7 days in case supply to be
extended from existing network
(b) in case extension/
augmentation of existing network
is required.
i. within 7 days in case of LT
supply;
ii. within 14 days in case of 11
kV supply;
iii. within 20 days in case of 33
kV supply;
iv. within 30 days in case of
supply above 33 kV;
98.0
Effecting of
reclassification/change in
category
From the date of inspection.
15
Redressal of
consumer’s
complaint
regarding billing
i.e. non-receipt,
wrong bill, etc.
In case requires no
additional information
Within 24 hours of receipt of
Complaint
99.0
If additional information is
required
Within 7 days of receipt of
Complaint
16
Reconnection of
Supply following
Urban Area
Within 6 hours of receipt of
payment from consumer
95.0
HARYANA GOVT. GAZ., MAY 12, 2020 (VYSK. 22, 1942 SAKA)
PART III]
230
disconnection due
to nonpayment of
bills (disconnection
less than 6 months
old)
Rural Areas
Within 12 hours of receipt of
payment from consumer
17
Refund of Advance Consumption Deposit/
Consumption Security, meter Security on
closure of account
Within 30 days of adjustment of
all dues.
99.0
18
Shifting of meter/
Service
connection/
Lines/
Equipments
Inspection of applicants
premises
Within 7 days of receipt of
application complete in all
respect along with prescribed
charges
Rs. 200 per day
or part there of
delay
Issue of demand notice
No. of days from the date of
inspection.
(a) 7 days in case supply to be
extended from existing network
(b) in case extension/
augmentation of existing network
is required.
i. within 7 days in case of LT
supply;
ii. within 14 days in case of 11
kV supply;
iii. within 20 days in case of 33
kV supply;
iv. within 25 days in case of
supply above 33 kV;
Shifting of meter/ Service
Connection
Within 7 days after receipt of
necessary charges and clearances.
Shifting of LT/ HT Lines
Within 20 days after receipt of
necessary charges and clearances.
Shifting of Transformer
Within 30 days after receipt of
necessary charges and clearances.
19
Issue of No Dues Certificates
Within 7 days from the date of
application and clearance of
outstanding dues, if any.
Rs. 100 per day
or part thereof
in case of delay
20
Compliance of Orders pronounced by CGRF
and Electricity Ombudsman
Within the time frame defined in
such order or the regulations
specified by the Commission in
this regard.
Rs. 100 per day
or part there of
delay
PART III]
HARYANA GOVT. GAZ., MAY 12, 2020 (VYSK. 22, 1942 SAKA)
231
21
Distribution
Transformer
failure rate
Urban Areas
Shall not exceed 3 % p.a.
Rural Areas
Shall not exceed 6 % p.a.
22
Faulty Meters (MNR, Burnt, Sticky, etc.)
Shall not exceed 1 % of metered installation
23
Billing Mistakes
Shall not exceed 0.1% of consumers billed
24
Reliability
Indices
The reliability indices mentioned hereunder shall be computed For all
11 kV feeders and consumers as per Regulation 11 using the following
indices: -
(i) System Average Interruption Frequency Index (SAIFI);
(ii) System Average Interruption Duration Index (SAIDI); and
(iii) Reliability Indices (RI)
Limits shall
be defined
separately
based on
data
submitted by
the licensee.
HARYANA GOVT. GAZ., MAY 12, 2020 (VYSK. 22, 1942 SAKA)
PART III]
232
Reporting formats for reporting the quarterly performance
Annexure-I
Format for reporting the performance levels for Guaranteed standards of performance on a quarterly basis to
the Commission
Name of Distribution Licensee:
Period of report
:
Sr.
No.
Nature of Service
Pending
Complaint
from
previous
quarter
(nos.)
Complaint
during
current
quarter
(nos.)
Total
Complaint
(nos.)
No. of Complaints
addressed (nos.)
Pending
complaint
at the end
of
Quarter
(nos.)
% age
addressed
within
time
Within
SOP
time
More
than
SOP
time
Total
Complaint
addressed
1
2
3
4
5=3+4
6
7
8=6+7
9=8-5
10=
(6*100)5
1
Response time for the consumer call
2
Registration of consumer call and issue
of complaint number
3
Normal fuse-
off
Urban Area
Rural Area
4
Line Break
Down
Urban Area
Rural Area
5
Underground
Cable fault
Urban Area
Rural Area
6
Distribution
Transformer
Failure
Urban Area
Rural Area
7
Major Power
Failure
involving
Power
Transformer/
Equipment etc.
Urban Area
Rural Area
8
Un scheduled load Shedding
9
Period of
Scheduled
outage
Maximum duration at
a stretch
Restoration of Supply
10 Meter
Complaints
Inspect and check
correctness
Replace slow/ fast /
creeping or stuck
meters
Replace burnt meters
PART III]
HARYANA GOVT. GAZ., MAY 12, 2020 (VYSK. 22, 1942 SAKA)
233
11 Application for
new
connection/
Additional
load/ reduction
in load
Inspection of
applicants premises
Issue of demand
notice
Release of Supply on
compliance of demand
notice and receipt of
requisite charges.
Agriculture Pump Sets
12 Release of
Temporary
Connection
Inspection of
applicants premises
Issue of demand
notice
Release of Supply on
compliance of demand
notice and receipt of
payment
13 Change of
Name
Intimation of charges
Effecting of change of
name
14 Reclassification
of consumer
category/
change of tariff
category
Inspection of
applicants premises
Issue of demand
notice
Effecting of
reclassification/change
in category
15 Redressal of
consumer’s
complaint
regarding
billing i.e. non
receipt, wrong
bill, etc.
In case requires no
additional information
If additional
information is
required
16 Reconnection
of Supply
following
disconnection
due to
nonpayment of
bills
(disconnection
less than 6
month old)
Urban Area
Rural Areas
17 Refund of Advance Consumption
Deposit/ Consumption Security and
meter Security on closure of account
HARYANA GOVT. GAZ., MAY 12, 2020 (VYSK. 22, 1942 SAKA)
PART III]
234
18 Shifting of
meter/ Service
connection/
Lines/
Equipments
Inspection of
applicants premises
Issue of demand
notice
Shifting of meter/
Service Connection
Shifting of LT/ HT
Lines
Shifting of
Transformer
19 Issue of No Dues Certificates
20 Compliance of Orders pronounced by
CGRF and Electricity Ombudsman
PART III]
HARYANA GOVT. GAZ., MAY 12, 2020 (VYSK. 22, 1942 SAKA)
235
Annexure-II
Information regarding faulty meters
Format for quarterly return to be submitted to the Commission by the Distribution Licensee.
Name of Distribution Licensee:
Period of report
:
Reference overall
standard
No. of faulty
meters at the
start of the
quarter
No. of faulty
meters added
during the
quarter
Total no. of
faulty meters
No. of meters
rectified/
replaced
No. of faulty
meters pending
at the end of the
quarter
HARYANA GOVT. GAZ., MAY 12, 2020 (VYSK. 22, 1942 SAKA)
PART III]
236
Annexure-III
Format regarding Compensation paid to the individual complaint
Name of Distribution Licensee:
Period of report
:
Sr.
No.
Complaint
number
Date of
filing of
complainant
Consumer
number
Name and
address of
complainant
Nature of
complaint
Reference
of SOP
Amount of
compensation
paid (in Rs.)
Date of payment
of compensation
(dd/mm/yyyy)
NOTE –
1.
The report shall be prepared as per category of item for which the compensation is paid for non-
adherence of Standards of Performance.
2.
Separate report be furnished where claims of complainant have been rejected by the Licensee.
PART III]
HARYANA GOVT. GAZ., MAY 12, 2020 (VYSK. 22, 1942 SAKA)
237
Annexure-IV
Format regarding damage of distribution transformers
Name of Distribution Licensee:
Period of report
:
Reference
overall
standard
Population of
distribution
transformers at
the start of the
quarter
Population of
distribution
transformers at
the end of the
quarter
Average
population of
distribution
transformers
during the
quarter
No. of
distribution
transformers
damaged during
the Quarter
Percentage of
damaged
transformer
1
2
3
4=avg. (2+3)
5
6=5*100/6
HARYANA GOVT. GAZ., MAY 12, 2020 (VYSK. 22, 1942 SAKA)
PART III]
238
Annexure-V
Format regarding Billing mistakes
Name of Distribution Licensee:
Period of report
:
Reference overall standard
Total No. of bills issued
during the quarter
Total No. of billing
complaints/ mistakes
received/ noticed during
the quarter
Percentage of billing
mistakes
1
2
3
4=3*100/2
PART III]
HARYANA GOVT. GAZ., MAY 12, 2020 (VYSK. 22, 1942 SAKA)
239
Annexure-VI
Format regarding Reliability Indices (11 kV Feeders)
Name of Distribution Licensee:
Period of report:
SI
No.
Name of
Villages
Type of
Villages
No. of
Feeders
on last
day of
the
Month
Total
No. of
Outages
of
feeders
during
the
Month
Total
Duration
of
Outages
of
Feeders
during
the
Month (in
Minutes)
Cumulative
No. of
Outages
w.e.f 1st
April till the
last day of
the month
Cumulative
Duration of
Outages
w.e.f 1st
April till the
last day of
the month
(Minutes)
Monthly
Average
No. of
Outages
of
Feeder
(Col 5/
Col4)
Monthly
Average
Duration of
Outages of
Feeder
(Minutes)
(Col 6/
Col4)
Monthly
Feeder
Reliability
Index*
Cumulative
Avg. No. of
Outages of
Feeder
(Col 7/
Col4)
Cumulative
Avg.
Duration of
Outages of
Feeder
(Minutes)
(Col 8/
Col4)
Cumulative
Feeder
Reliability
/index**
1
2
3
4
5
6
7
8
9= (5)/
(4)
10=(6)/(4)
11
12= (7)/ (4)
13= (8)/ (4)
14
* Monthly Feeder Reliability Index =
{Col.4* Total minutes in the month}-Col.6}*100
{Col.4*Total minutes in the month}
*Shall include all outages due to grid constraints, planned shutdowns, unplanned shutdown or forced shutdown including
momentary interruptions
Should be highlighted
** Cumulative Feeder Reliability Index = {Col.4* Total minutes in the cumulative period}-Col.8}*100
{Col.4*Total minutes in the cumulative period}
Note-Type of Villages
RV Remote Villages, MV Main Villages,
Periodicity- Monthly
HARYANA GOVT. GAZ., MAY 12, 2020 (VYSK. 22, 1942 SAKA)
PART III]
240
Annexure-VII
Format regarding Reliability Indices (Consumer)
Name of Distribution Licensee:
Period of report:
SI
No.
Name
of
City/
Towns
Type
of
City/
Town
No. of
Consumers
on last
day of the
Month
Total No.
of
Consumers
Interruption
during the
Month
Total
Duration of
Consumer
Interruption
during the
Month (in
Minutes)
Cumulative
No.
Consumer
Interruption
w.e.f 1st
April till the
last day of
the month
Cumulative
Duration of
Outages
w.e.f 1st
April till the
last day of
the month
(Minutes)
Monthly
Average
No. of
Consumer
Interruption
(Col 5/
Col4)
Monthly
Average
Duration of
Consumer
Interruption
(Minutes)
(Col 6/ Col
4)
Monthly
Consumer
Reliability
Index*
Cumulative
Avg. No. of
Consumer
Interruption
(Col 7/ Col
4)
Cumulative
Avg.
Duration of
Consumer
Interruption
(Minutes)
(Col 8/ Col
4)
Cumulative
Consumer
Reliability
/index**
1
2
3
4
5
6
7
8
9=(5)/(4)
10=(6)/(4)
11
12=(7)/(4)
13=(8)/(4)
14
* Monthly Feeder Reliability Index =
{Col.4* Total minutes in the month}-Col.6}*100
{Col.4*Total minutes in the month}
** Cumulative Feeder Reliability Index = {Col.4* Total minutes in the cumulative period}-Col.8}*100
{Col.4*Total minutes in the cumulative period}
Note-Type of Town
SC State Capital
MT Town with more than 8 lakh population
DH District Headquarter
OT Other Town
*Shall include all outages due to grid constraints, planned shutdowns, unplanned shutdown or forced shutdown including
momentary interruptions should be highlighted
[83–1]
(Sd.)…,
Secretary, HERC,
Bays No. 33-36, Sector-4,
Panchkula (Haryana).