(2945)

Haryana Government Gazette

EXTRAORDINARY

Published by Authority

© Govt. of Haryana

No. 191-2020/Ext.] CHANDIGARH, WEDNESDAY, DECEMBER 23, 2020 (PAUSA 2, 1942 SAKA)

HARYANA GOVERNMENT

IRRIGATION AND WATER RESOURCES DEPARTMENT

Notification

The 23rd December, 2020

No. 2/62/2020-1IW.— In exercise of the powers conferred under Sub-section (1) of Section 16 of" The

Haryana Water Resources (Conservation, Regulation And Management) Authority Act, 2020, (the Act) the

procedure, forms, terms & conditions, fee and charges etc., for seeking permissions from “The Haryana Water

Resources Authority” (Short HWRA) under Section 16 of the Act is hereby provided as under till the time Authority

is constituted under sub-section (4) of section 3 of the Act.

This notification is being issued to enable and give effect to the provisions of section 16 of the Act, however,

the procedure, forms, terms & conditions, fee and charges etc. are subject to further variations, if need be.

1)

The intended user i.e. industry, mining or infrastructure, as the case may be, may apply, online from the

portal of the authority, for seeking permissions to use water.

2)

An online application shall be made to the Authority for seeking permission/No objection Certificate to

use water, for industrial use, alongwith such documents and information specified in the Schedule-I.

3)

An online application shall be made to the Authority for seeking permission/No objection Certificate to

use water, for mining use, in alongwith such documents and information specified in the Schedule-II.

4)

An online application shall be made to the Authority for seeking permission/No objection Certificate to

use water, for infrastructure use, alongwith such documents and information specified in the Schedule-III.

5)

The person or entity, as the case may be, shall pay a processing fee, as provided under Schedule-IV,

alongwith the application for seeking permissions/No objection Certificate.

6)

All the permissions to be given, shall be subject to such terms and conditions as mentioned in the

respective Schedule and as the Authority may deem fit.

7)

All the permissions/No objection Certificate shall be given under the seal of the Authority and under

the signature of the Administrative Secretary, Government of Haryana, Irrigation and water resources

department, or by person designated by him.

8)

All the permissions/No objection Certificate shall be valid for one year :

Provided that once the Authority is constituted all the permissions/No objection Certificate, which are

given under this notification, shall continue to be valid subject to approval by the constituted Authority :

Provided further that the applicant has to comply with the further terms and conditions as may be

imposed by the constituted Authority and no person can deny to comply with the terms and conditions merely

because he has sought the permissions/No objection Certificate under this notification.

2946

HARYANA GOVT. GAZ. (EXTRA.), DEC. 23, 2020 (PAUS. 2, 1942 SAKA)

9)

The applicant, on grant of permission/No objection Certificate, shall be liable to pay Ground water

abstraction/ restoration charges as per Appendix 5.0.

Exemptions from seeking No Objection Certificate :

Following categories of users/persons shall be exempted from seeking No Objection Certificate for ground

water extraction :

(i)

Individual domestic consumers in both rural and urban areas for drinking water and domestic

uses where public water supplies do not exist.

(ii)

Rural drinking water supply schemes.

(iii)

Armed Forces Establishments and Central Armed Police Forces establishments in both rural and

urban areas.

(iv)

Agricultural activities.

(v)

Micro and small Enterprises drawing ground water less than 10 cum/day. However, such MSME

shall get its self registered itself with the Authority.

---------

HARYANA GOVT. GAZ. (EXTRA.), DEC. 23, 2020 (PAUS. 2, 1942 SAKA)

2947

SCHEDULE-I

Industrial Use :-

In Over-exploited assessment units, NOC shall not be granted for ground water abstraction to any new industry

except those falling in the category of Micro, Small and Medium Enterprises (MSME). However, NOC for drinking/

domestic use for work force, use by these new industries shall be permitted. NOC shall not be granted to new

packaged water industries or water intensive industries in Overexploited areas, even if they belong to MSME

category.

NOC for ground water extraction by industries shall be granted subject to the following specific conditions :

(i)

NOC shall be granted only in such cases where local government water supply agencies are not able to

supply the desired quantity of water.

(ii)

All industries shall be required to adopt latest water efficient technologies so as to reduce dependence

on ground water resources.

(iii)

All industries abstracting ground water between 100-500 m3/d shall be required to undertake self annual

water audit as per the format provided by HWRA along with the affidavit and submit audit reports

within three months of completion of the same to HWRA. Industries abstracting ground water in excess

of 500 m3/d shall be required to undertake annual water audit through Confederation of Indian

Industries (CII)/ Federation Indian Chamber of Commerce and Industry (FICCI)/ National Productivity

Council (NPC) certified auditors and submit audit reports within three months of completion of the

same to HWRA. All industries shall be required to reduce their ground water use by at least 20% over

the next three years through appropriate means.

(iv)

Construction of observation well(s) (piezometer)(s) alonwith automatic water level recorder, within

6 months from the date of issuance of NOC, within the premises and installation of appropriate water

level monitoring mechanism, shall be mandatory for industries drawing/ proposing to draw more than

500 m3/day of ground water and. Monitoring of water level shall be done by the project proponent. The

piezometer (observation well) shall be constructed at a minimum distance of 15 m. from the bore

well/production well. Depth and aquifer zone tapped in the piezometer shall be the same as that of the

pumping well/ wells. Detailed guidelines for design and construction of piezometers are given in

Annexure II. Monthly water level data shall be submitted to the HWRA through the web portal.

(v)

The proponent shall be required to adopt roof top rain water harvesting/ recharge in the project

premises. Industries which are likely to pollute ground water (chemical, pharmaceutical, dyes,

pigments, paints, textiles, tannery, pesticides/ insecticides, fertilizers, slaughter house, explosives etc.)

shall store the harvested rain water in surface storage tanks for use in the industry and accordingly

reduce their abstraction of ground water requirement.

(vi)

Injection of treated/ untreated waste water into aquifer system is strictly prohibited.

(vii)

Industries which are likely to cause ground water pollution e.g. Tanning, Slaughter Houses, Dye,

Chemical/ Petrochemical, Coal washeries, other hazardous units etc. (as per CPCB list) need to

undertake necessary well head protection measures to ensure prevention of ground water pollution

(Annexure III).

(viii) All industries drawing ground water in safe, semi-critical and critical assessment units shall be required

to pay ground water abstraction charges as applicable as per Tables 5.2 A and 5.3 A.

(ix)

All existing industries drawing ground water in over-exploited assessment units shall be liable to pay

ground water restoration charges as applicable as per Tables 5.2 B and 5.3 B.

Documents to be submitted with the application

(a)

An affidavit on non judicial stamp paper of Rs. 10/- regarding non availability of water supply from

local government agencies in cases where ground water requirement is up to 10 m3/day.

(b)

Certificate regarding non/ partial availability of fresh water/ treated waste water supply from the local

government water supply agency, where such agency is responsible to supply water for industrial

purpose, in cases where requirement of ground water is more than 10 m3/day.

(c)

Ground water quality data of existing bore well/ tube well/ dug well from any NABL accredited

laboratory or Govt. approved laboratory (in case of existing projects applying for NOC).

(d)

Water quality data of bore well/ tube well/ dug well in respect of existing industries from NABL

accredited laboratories/Government approved laboratories. ( to be removed).

(e)

Proposal for rain water harvesting/ recharge within the premises as per Model Building Bye Laws

issued by Ministry of Housing & Urban Affairs.

2948

HARYANA GOVT. GAZ. (EXTRA.), DEC. 23, 2020 (PAUS. 2, 1942 SAKA)

(f)

Impact Assessment report: All projects extracting/proposing to extract ground water in excess of

500 m3/day in Over-exploited, Critical and Semi-critical areas shall have to mandatorily submit impact

assessment report of existing/ proposed ground water withdrawal on the ground water regime and also

socio-economic impacts report prepared by accredited consultants. Pro-forma for the report is given in

Annexure IV.

SCHEDULE-II

MINING PROJECTS :-

All existing as well as new mining projects will be required to obtain NOC for ground water abstraction. Since

mining projects are location specific, there will be no ban on grant of NOC for abstraction of ground water for such

projects in over-exploited assessment units.

NOC for mining projects shall be granted subject to the following specific conditions :

(i)

It shall be mandatory for all the mining industries to ensure that water available from de-watering

operations is properly treated and should be gainfully utilized for supply for irrigation, dust

suppression, mining process, recharge in downstream and for maintaining e-flows in the river system.

(ii)

Construction of observation well(s) (piezometers) along the periphery in the premises, for monthly

ground water level monitoring, shall be mandatory for mines drawing/ proposing to draw more than

100 m3/day of ground water. Depth and aquifer zone tapped in the piezometer shall be commensurate

with that of pumping well/ wells.

(iii)

In addition, the proponent shall monitor ground water levels by establishing observation wells

(piezometers) in the core and buffer zones as specified in the NOC.

(iv)

In case of coal and other base metal mining the project proponent shall use the advance dewatering

technology (by construction of series of dewatering abstraction structures) to avoid contamination of

surface water.

(v)

In addition to this, all mining units shall also monitor the water quality of mine seepage and mine

discharge through NABL accredited/ Govt. approved laboratories and the same shall be submitted at

the time of self compliance.

(vi)

All mining projects drawing ground water in safe, semi-critical and critical assessment units shall be

required to pay ground water abstraction charges as applicable as per Tables 5.4 A.

(vii)

All mining projects drawing ground water in over-exploited assessment units shall be liable to pay

ground water restoration charges as per Table 5.4 B.

(viii) All the mining projects purchasing ground water from the irrigation tube wells through tankers shall be

liable to pay ground water restoration charges as per the table 5.4 B.

Documents to be submitted with the application

(a)

Mining plan approved by the concerned Govt. agency/ department.

(b)

Proposal for rain water harvesting/ recharge within the premises as per Model Building Bye Laws

issued by Ministry of Housing & Urban Affairs.

(c)

Comprehensive report prepared by accredited consultant on ground water conditions in both core and

buffer zones of the mine, depth wise and year wise mine seepage calculations, impact assessment of

mining and dewatering on ground water regime and its socio-economic impact, details of recycling,

reuse and recharge, reduction of pumping with use of technology for mining and water management to

minimize and mitigate the adverse impact on ground water, based on local conditions. Format for report

is given in Annexure-V.

HARYANA GOVT. GAZ. (EXTRA.), DEC. 23, 2020 (PAUS. 2, 1942 SAKA)

2949

SCHEDULE-III

INFRASTRUCTURE PROJECTS :-

Since infrastructure projects are location specific, grant of NOC to such projects located in over-exploited assessment

units shall not be banned. New infrastructure projects/ residential buildings may require dewatering during

construction activity and/ or use ground water for construction. In both cases, applicants shall seek NOC from

HWRA before commencement of work. However, in over-exploited assessment units, use of ground water for

construction activity shall be permitted only if no treated sewage water is available within 10 km. radius of the site.

New as well as existing Infrastructure projects shall also be required to seek NOC for abstraction of ground water.

No NOC shall be granted for extraction of groundwater for Water Parks, Theme Parks and Amusement Parks in

over-exploited assessment units.

Indicative list of Infrastructure projects is given in Annexure VI.

The NOC for ground water abstraction will be granted subject to the following specific conditions :

(i)

In case of infrastructure projects that require dewatering, proponent shall be required to carry out

regular monitoring of dewatering discharge rate (using a digital water flow meter) and submit the data

through the web portal to HWRA as applicable. Monitoring records and results should be retained by

the proponent for two years, for inspection or reporting as required by HWRA.

(ii)

Installation of Sewage Treatment Plants (STP) shall be mandatory for new projects, where ground

water requirement is more than 50 m3/day. The water from STP shall be utilized for toilet flushing, car

washing, gardening etc.

(iii)

For infrastructure dewatering/ construction activity, NOC shall be valid for specific period as per the

detailed proposal submitted by the project proponent.

(iv)

All infrastructure projects drawing ground water in safe, semi-critical and critical assessment units shall

be required to pay ground water abstraction charges as applicable as per Table 5.3 A.

(v)

All infrastructure projects (new/ existing) drawing ground water in over-exploited assessment units

shall be liable to pay ground water restoration charges as per Table 5.3 B.

Documents to be submitted with the application

(a) In cases where dewatering is involved, submission of impact assessment report prepared by an

accredited consultant on the ground water situation in the area giving detailed plan of pumping,

proposed usage of pumped water and comprehensive impact assessment of the same on the ground

water regime shall be mandatory. The report should highlight environmental risks and proposed

management strategies to overcome any significant environmental issues such as ground water level

decline, land subsidence etc.

(b)

An affidavit on non judicial stamp paper of Rs. 10/- regarding non availability of water from any other

source in case water is required for construction in safe and semi critical areas.

(c)

Certificate from a government agency regarding non availability of treated sewage water for

construction within 10 km. radius of the site in critical and over-exploited areas.

(d)

Certificate of non-availability of water from local government water supply agency in respect of all

categories of assessments units for commercial use.

(e)

Proposal for rain water harvesting/ recharge within the premises as per Model Building Bye Laws

issued by Ministry of Housing & Urban Affairs.

(f)

Details of water requirement computed as per National Building Code, 2016 (Annexure I), taking into

account recycling/ reuse of treated water for flushing, irrigating green areas etc. (in case of completed

infrastructure projects for commercial use).

(g)

Completion certificate from the concerned agency for infrastructure projects requiring water for

commercial use.

2950

HARYANA GOVT. GAZ. (EXTRA.), DEC. 23, 2020 (PAUS. 2, 1942 SAKA)

SCHEDULE IV

Fee (in Rupees) to be deposited along with the online application for seeking permissions/NOC

for industrial use: A. 10-100 cum/day : 25,000/-

B. >100 – 500 cum/day : 50,000/-

C. >500-1000 cum/day : 1,00,000/-

D. >1000 cum/day : 1,50,000/-

In case of renewal, the application fee shall be deposited at the half of the above rates.

for infrastructure use: A. Government /PSU/Semi-Government : 50,000/-

B. Others : 1,50,000/-

In case of renewal, the application fee shall be deposited at the half of the above rates

for mining use : A. Direct user : 1,50,000/-

B. Indirect Users : 75,000/-

In case of renewal, the application fee shall be deposited at the half of the above rates

Fee shall be deposited by the applicant online through link provided in the web portal of the Authority.

HARYANA GOVT. GAZ. (EXTRA.), DEC. 23, 2020 (PAUS. 2, 1942 SAKA)

2951

Appendix 5.0

Ground water abstraction/ restoration charges

All residential apartments/ group housing societies/ Government water supply agencies in urban areas shall be

required to pay ground water abstraction charges.

All industries/mining/ infrastructure projects drawing ground water in safe, semi-critical and critical assessment units

will have to pay ground water abstraction charges based on quantum of ground water extraction and category of

assessment unit as per details given in this guideline.

All existing mining/ infrastructure projects and existing industries including MSME drawing ground water in

over-exploited assessment units will have to pay ground water restoration charges based on quantum of ground water

extraction. Further, new MSME, new infrastructure and new Mining projects in over exploited areas shall also be

required to pay ground water restoration charges.

Existing industries, infrastructure units and mining projects which have installed/constructed artificial recharge

structures in compliance of the conditions prescribed in the groundwater guidelines prevailing at the time of grant of

NOC or its renewal shall be eligible for a rebate of 50% (fifty percent) in the ground water abstraction charges/ground

water restoration charges, subject to their satisfactory performance and verification.

The revenue generated from the proposed water abstraction/ restoration charges shall be kept in a separate fund for

implementation of site specific suitable demand/ supply side interventions.

5.1 Rates of Ground water abstraction /restoration charges

I.

Drinking and domestic use for residential apartments/ group housing societies/ Government water

supply agencies in Urban areas

All residential apartments/ Group Housing Societies requiring water only for drinking/domestic use requiring NOC

would pay ground water abstraction charges as per rates given below in Table 5.1.

Table 5.1 Ground Water Abstraction charges for Drinking & Domestic use.

Government water supply agencies and Government infrastructure projects shall pay Ground water abstraction

Charges @ Rs. 0.50 per m3.

II.

Packaged Drinking Water units

Rates of ground water abstraction charges for packaged drinking water units in safe, semi-critical and critical

assessment units are given in Table 5.2 A and those for ground water restoration charges in over-exploited assessment

units are given in Table 5.2 B.

Table 5.2 A: Rates of ground water abstraction charges for packaged drinking water units (Rs. per m3)

S. No.

Category

of area

Ground

water use

Quantum of ground water withdrawal

Up to 50m3/

day

51 to <200

m3/day

200 to <1000

m3/day

1000 to

<5000

m3/day

5000

m3/day

and above

1.

Safe

1.00

3.00

5.00

8.00

10.00

2.

Semi-critical

2.00

5.00

10.00

15.00

20.00

3.

Critical

4.00

10.00

20.00

40.00

60.00

Quantum of Groundwater withdrawal

(m3/month)

Rate of ground water abstraction

charges

(Rs. per m3)

0-25

No charge

26-50

1.00

>50

2.00

2952

HARYANA GOVT. GAZ. (EXTRA.), DEC. 23, 2020 (PAUS. 2, 1942 SAKA)

Table 5.2 B: Rates of ground water restoration charges for packaged drinking water units (Rs. per m3)

S. No.

Category

of area

Ground

water use

Quantum of ground water withdrawal

Up to 50

m3/day

51 to <200

m3/day

200 to <1000

m3/day

1000 to

<5000

m3/day

5000

m3/day

and above

1.

Over-exploited

(existing industries

only)

8.00

20.00

40.00

80.00

120.00

III.

Other Industries & infrastructure projects

Rates of ground water abstraction charges for other industries and infrastructure projects in safe, semi-critical and

critical assessment units are given in Table 5.3 A and those for ground water restoration chargesinover-exploited

assessment units are given in Table 5.3 B.

Table 5.3 A: Rates of Ground Water abstraction charges for other industries & infrastructure projects

(Rs. per m3)

S. No.

Category

of area

Ground

water use

Quantum of ground water withdrawal

< 200

m3/day

200 to <1000

m3/day

1000 to

<5000

m3/day

5000 m3/day and

above

1.

Safe

1.00

2.00

3.00

5.00

2.

Semi-critical

2.00

3.00

5.00

8.00

3.

Critical

4.00

6.00

8.00

10.00

Table 5.3 B: Rates of ground water restoration charges for other industries & infrastructure projects

(Rs. per m3)

S. No.

Category

of area

Ground

water use

Quantum of ground water withdrawal

< 200

m3/day

200 to <1000

m3/day

1000 to

<5000

m3/day

5000 m3/day and

above

1.

Over-exploited

(existing

industries /new Industries

as

per

the

present

Guidelines)

6.00

10.00

16.00

20.00

IV.

Mining projects

Rates of ground water abstraction charges for mining, which are drawing ground water in safe, semi-critical and

critical assessment units are given in Table 5.4 A and those for ground water restoration charges in case of projects

drawing ground water in over-exploited assessment units are given in Table 5.4 B.

HARYANA GOVT. GAZ. (EXTRA.), DEC. 23, 2020 (PAUS. 2, 1942 SAKA)

2953

Table 5.4 A: Rates of ground water abstraction charges for mining ( Rs. per m3)

S. No.

Category

of area

Ground

water use

Quantum of ground water withdrawal

< 200

m3/day

200 to <1000

m3/day

1000 to

<5000

m3/day

5000 m3/day and

above

1.

Safe

1.00

2.00

2.50

3.00

2.

Semi-critical

2.00

2.50

3.00

4.00

3.

Critical

3.00

4.00

5.00

6.00

Table 5.4 B: Rates of ground water restoration charges for mining (Rs. per m3)

S. No.

Category

of area

Ground

water use

Quantum of ground water withdrawal

< 200

m3/day

200 to <1000

m3/day

1000 to

<5000

m3/day

5000 m3/day and

above

1.

Over-exploited

4.00

5.00

6.00

7.00

Water Abstraction and Restoration charges set-off Scheme.

Ground water charges shall be volumetric and shall be based on actual consumption. The initial quantity

(upto 10 m3/day) shall be charged at the lowest applicable rate of the charges above and if the usage is exceeded the

permitted quantities, the entire usage of water during the billing period shall be charged at higher rates mentioned in

the said table.

The consumer will get due credit for conservation of water. The quantity of water conserved and/or recharged

to ground water will be set-off with the usage of water consumed. The set-off water used and conserved and/or

recharged shall be done at the end of the year.

DEVENDER SINGH,

Additional Chief Secretary to Government Haryana,

Irrigation & Water Resources Department.

2954

HARYANA GOVT. GAZ. (EXTRA.), DEC. 23, 2020 (PAUS. 2, 1942 SAKA)

Annexure I

Estimation of Water Requirements for drinking and domestic use

(Source: National Building Code 2016, BIS)

(a)

Residential Buildings :

Accommodations

Population

1 Bedroom dwelling unit

4

2 Bedroom dwelling unit

5

3 Bedroom dwelling unit

6

4 Bedroom dwelling unit and above

7

Notes:

1)

The above figures consider a domestic household including support personnel, wherever applicable.

2)

For plotted development, the population may be arrived at after due consideration of the expected

number and type of domestic household units.

3)

Dwelling unit under EWS category shall have population requirement of 4 and studio apartment shall

have population requirement of 2.

As a general rule the following rates per capita per day may be considered for domestic and non-domestic needs :

(a)

For communities with populations up to 20,000 :

1)

Water supply through stand post:

40 lphd (Min)

2)

Water supply through house service: connection

70 to 100 lphd

(b)

For communities with :

100 to 135 lphd

population 20,000 to 100,00 together with

full flushing system

(c)

For communities with population :

150 to 200 lphd

above 100,000 together with

full flushing system

Note—The value of water supply given as 150 to 200 litre per head per day may be reduced to 135 litre per head per

day for houses for Medium Income Group (MIG) and Low Income Groups (LIG) and Economically Weaker Section

of Society (EWS), depending upon prevailing conditions and availability of water.

Out of the 150 to 200 litre per head per day, 45 litre per head per day may be taken for flushing requirements and the

remaining quantity for other domestic purposes.

B.

Water Requirements for Buildings Other than Residences

Sl.

No.

Type of Building

Domestic litres

per head/ day

Flushing

Litres per head/

day

Total Consumption

Litres per head/ day

1.

Factories including canteen where

bath rooms are required to be

provided

30

15

45

2.

Factories including canteen where no

bath rooms are required to be

provided

20

10

30

3.

Hospital (excluding laundry and

kitchen):

a) Number of beds not exceeding

100

b) Number of beds exceeding 100

c) Out Patient Department (OPD)

230

110

340

300

150

450

10

5

15

4.

Nurses’ homes and medical quarters

90

45

135

HARYANA GOVT. GAZ. (EXTRA.), DEC. 23, 2020 (PAUS. 2, 1942 SAKA)

2955

5.

Hostels

90

45

135

6.

Hotels (up to 3 star) excluding

laundry, kitchen, staff and water

bodies

120

60

180

7.

Hotels (4 star and above) excluding

laundry, kitchen, staff and water

bodies

260

60

320

8.

Offices (including canteen)

25

20

45

9.

Restaurants and food court

including water requirement for

kitchen:

a) Restaurants

b) Food Court

55 per seat

15 per seat

70 per seat

25 per seat

10 per seat

35 per seat

10.

Clubhouse

25

20

45

11.

Stadiums

4

6

10

12.

Cinemas, concert halls and theatres

and multiplex

5 per seat

10 per seat

15 per seat

13.

Schools/Educational institutions:

a) Without boarding facilities

b) With boarding facilities

25

20

45

90

45

135

14.

Shopping and retail (mall)

a) Staff

b) Visitors

25

20

45

5

10

15

15.

Traffic Terminal stations

(a)

Airports

40

30

70

(b) Railway stations (Junction)

with bathing facility

40

30

70

(c) Railway stations (Junction)

without bathing facility

30

15

45

(d) Railway stations (Intermediate)

with bathing facility

25

20

45

(e) Railway stations (Intermediate)

without bathing facility

15

10

25

(f)

Interstate bus terminals

25

20

45

(g) Intrastate Bus Terminals/

Metro Stations

10

5

15

2956

HARYANA GOVT. GAZ. (EXTRA.), DEC. 23, 2020 (PAUS. 2, 1942 SAKA)

Notes:

1.

For calculating water demand for visitors, consumption of 15 litre per head per day may be taken.

2.

The water demand includes requirement of patients, attendants, visitors and staff. Additional water

demand for kitchen, laundry and clinical water shall be computed as per actual requirements.

3.

The number of persons shall be determined by average number of passengers handled by stations, with

due considerations given to the staff and vendors who are using these facilities.

4.

Consideration should be given for seasonal average peak requirements.

5.

The hospitals may be categorized as Category A (25 to 50 beds), Category B(51 to 100 beds), Category C

(101 to 300 beds), Category D (301 to 500) and Category E (501 to 750 beds).

HARYANA GOVT. GAZ. (EXTRA.), DEC. 23, 2020 (PAUS. 2, 1942 SAKA)

2957

Annexure II

Guidelines for construction of Piezometers and monitoring of Ground Water Levels and Quality

Piezometer is a borewell/tubewell used only for measuring the water level by lowering a tape/sounder or automatic /

digital water level measuring equipment. It is also used to take water sample for water quality testing whenever

needed. General guidelines for installation of piezometers are as follows :

The piezometer is to be installed/constructed at the minimum distance of 50 m. from the pumping

well through which ground water is being withdrawn. The diameter of the piezometer should be about

“4 to 6”.

The depth of the piezometer should be the same as that of the pumping well from which ground water

is being abstracted. If, more than one pumping wells are constructed tapping aquifers at different

depths, more than one piezometers shall be required to be constructed tapping different aquifers as in

the pumping wells.

The measurement of water level in piezometer should be taken, only after the pumping from the

surrounding tubewells has been stopped for about four to six hours.

The ground water quality has to be monitored once in a year during pre-monsoon (April/ May) period

by industries and mines drawing ground water. Samples of ground water should be analyzed from

NABL accredited laboratory.

A permanent display board should be installed at Piezometer/ Tubewell site for providing the location,

piezometer/ tubewell number, depth and zone tapped of piezometer/tubewell for standard referencing

and identification.

Any other site specific requirement regarding safety and access for measurement may be taken care off.

2958

HARYANA GOVT. GAZ. (EXTRA.), DEC. 23, 2020 (PAUS. 2, 1942 SAKA)

Annexure III

Measures to be adopted to ensure prevention from pollution in the plant premises of polluting industries/

projects

It has been observed that ground water in and around polluting industries like Tannery, Slaughter Houses, Dye,

Chemical, Coalwashery, other hazardous units, etc., is polluted. In order to prevent further deterioration of ground

water quality, it is essential to take all necessary measures for well head protection. All industries/ projects falling

under this category are hereby directed to follow the under mentioned procedure both for existing and new category.

1.

No tube well/ bore well / dug well should be constructed in the vicinity of the processing unit. Tube well/ bore

well should be constructed at the place which is hygienically maintained.

2.

Only Mild Steel pipe should be used for assembly/ casing and PVC (Poly Vinyl Chloride) or similar pipes

should not be used. The tube well/ bore well having PVC or similar pipes should be abandoned and filled

back.

3.

Around the tube well/ bore well, RCC (Reinforced Concrete Cement) grouting of 3 meters (length) x 3 meters

(width) x 2 meters (depth) must be provided. The pipe of the tube well/ bore well must be raised 1 meter above

ground level (1 magl). The tube well/ bore well must be surrounded by RCC wall of 0.5 meter height and

1.5 meter depth to prevent any surface contamination to enter the constructed tube well/ bore well.

Plan/Sectional diagram is enclosed for reference.

3.

The tube well/ bore well must be fitted with NRV (Non Return Valve) in order to ensure that the constructed

tube well/ bore well is exclusively used for abstraction of ground water only.

4.

At no point of time there should be any injection of any water or fluid into the constructed tube well/

bore well/ Piezometer.

5.

The industries/ projects under this category should not implement any recharge measures within the plant

premises.

6.

Any tube well/ bore well located/ constructed in the vicinity of STP (Sewage Treatment Plant) or

ETP (Effluent Treatment Plant) should be abandoned and filled back.

7.

The piezometer to be constructed for monitoring purpose should follow the same procedure as that for

tube well/ bore well for such industries/ projects.

HARYANA GOVT. GAZ. (EXTRA.), DEC. 23, 2020 (PAUS. 2, 1942 SAKA)

2959

Plan/ Sectional diagram showing well head protection

2960

HARYANA GOVT. GAZ. (EXTRA.), DEC. 23, 2020 (PAUS. 2, 1942 SAKA)

Plan/ Sectional diagram showing well head protection

HARYANA GOVT. GAZ. (EXTRA.), DEC. 23, 2020 (PAUS. 2, 1942 SAKA)

2961

Annexure-IV

Outline of hydro-geological Report for obtaining NOC for industries

1.

Brief about the proposed project giving location details, coordinates, google/ toposheet maps, etc. demarcating

the project area.

2.

Ground water situation in and around the project area including water level and quality data and maps along

with quality issues, if any. In case of mines, ground water conditions in both core and buffer zone should be

described.

3.

Details of the tubewells/ borewells proposed to be constructed. This includes the drilling depth, diameter,

tentative lithological log, details of pump to be lowered, H.P. of pump, tentative discharge of tubewells/

borewells, etc. Locations to be marked on the site plan/ map. Location of proposed piezometers.

4.

Approved Mine plan in case of mines and detailed dewatering plan in case of mine/ infrastructure dewatering

projects.

5.

Proposed usage of pumped water in case of mining/ infrastructure dewatering projects.

6.

Comprehensive assessment of the impact on the ground water regime in and around the project area

highlighting the risks and proposed management strategies proposed to overcome any significant

environmental issues.

7.

Proposed measures for disposal of waste water by industries drawing saline water.

8.

Measures to be adopted for water conservation which include recycling, reuse, treatment, etc. This includes the

water balance chart being adopted by the firm along with details of water conservation methods to be adopted.

-

Brief write up along with capacity and flow chart of Sewage Treatment Plants / Effluent Treatment

Plants / Combined Effluent Treatment Plants existing/ proposed within the project.

-

Details of water conservation measures to be adopted to reduce/ save the ground water.

-

Total water balance chart showing the usage of water for various processes.

9.

Any other details pertaining to the project.

2962

HARYANA GOVT. GAZ. (EXTRA.), DEC. 23, 2020 (PAUS. 2, 1942 SAKA)

Annexure V

Format of the Report on ground water conditions (for mining projects)

Introduction

Project description

Background

Objectives and scope

Regional setting

Location

Land-use

Climate

Topography and drainage

Geology –Regional and Local

General Hydrogeology (aquifer types, aquifer depth, zone tapped etc.)

Groundwater condition (In core and buffer zones)

Spatial and temporal variations in water levels Groundwater quality (Shallow and deep aquifer)

Impact of groundwater extraction on local groundwater

Hydrograph of water level/piezometer in monitoring wells

Trend analysis of historical water levels Flow net analysis (groundwater flow direction)

Year wise/ bench wise mine dewatering computation as per approved mine plan

Conclusions

HARYANA GOVT. GAZ. (EXTRA.), DEC. 23, 2020 (PAUS. 2, 1942 SAKA)

2963

Annexure VI

Indicative list of Infrastructure projects

Residential townships including commercial buildings

Office building

School

College

University

Special Economic Zone

Metro Station

Railway Station

Bus Depot

Airport

Seaport

Highway infrastructure

Fire station

Warehouse

Business Plaza

Malls & Multiplex

Hospitals

Nursing Homes

Resort

Hotel/ Restaurant / Food Plaza

Holiday home / Guest house/ Hostels

Banquet Hall / Marriage Gardens

IT Complex

Logistics & Cargo

Clubs

Trade Centre/ Agri Markets

2964

HARYANA GOVT. GAZ. (EXTRA.), DEC. 23, 2020 (PAUS. 2, 1942 SAKA)

STAGE OF GROUND WATER DEVELOPMENT AND CATEGORIZATION OF THE BLOCKS AS ON

31-3- 2017

Sr. No.

District

Over-exploited

Critical

Semi-critical

Safe

1.

Ambala

Barara, Naraingarh, Saha

Shahzadpur Ambala-I

Ambala-II

2.

Bhiwani

Behal, Kairu, Loharu, Tosham

-

Bhiwani

Bhiwani

Siwani

Khera,

3.

Charkhi Dadri

Badhra, Jhoju

-

Ch. Dadri

Baund

4.

Faridabad

Ballabhgarh, Faridabad

-

-

-

5.

Fatehabad

Fatehabad, Ratia, Tohana,

Jakhal, Bhattu Kalan

Bhuna

-

-

6.

Gurugram

Farukhnagar,

Pataudi, Sohna, Gurugram

7.

Hissar

Adampur, Agroha, Narnaund

Barwala

Bass,

Hisar-I,

Hisar-II, Uklana

Hansi

8.

Jhajjar

Jhajjar, Matanhail,

Salhawas, Beri,

Bhadurgarh

9.

Jind

Alewa, Uchana, Ujhana,

Safidon, Jind

-

Pillukhera

Julana, Narwana

10.

Kaithal

Siwan, Gulha, Kaithal, Kalyat,

Pundri, Rajaund, Dhand

-

-

-

11.

Karnal

Assandh, Gharaunda,

Karnal, Nilokheri,

Nissing at Chirao

-

Indri

-

12.

Kurukshetra

Ismailabad,

Babain, Ladwa,

Pehowa, Shahbad, Thanesar,

Pipli

-

-

-

13.

M.garh

Kanina, Mahendragarh

-

Nangal

Chaudhary,

Satnali, Simha,

Ateli Nangal

Narnaul, Nizampur

14.

Mewat

Punhana, Tauru

-

Nuh, Ferozepur

Jhirka

Nagina

15.

Palwal

Hassanpur, Hathin, Hodel,

Palwal

-

-

-

16.

Panchkula

-

-

Raipur Rani

Pinjore, Barwala

17.

Panipat

Bapoli,

Israna,

Panipat, Samalkha

Madlauda,

-

-

-

18.

Rewari

Khol, Rewari, Nahar

-

Dahina, Jatusana

Bawal

19.

Rohtak

Lakhan Majra,

Meham, Kalanaur,

Sampla, Rohtak

20.

Sirsa

Ellenabad,

Rania, Sirsa,

Nathusari Chopta, Baraguda,

Odhan, Dabwali

-

-

-

21.

Sonepat

Ganaur, Sonepat, Rai

-

Mundlana

Gohana, Kathura,

Kharkhoda

22.

Yamunanagar Chachrauli, Jagadhri,

Mustafabad, Khizrabad, Radour

-

Sadaura, Bilaspur

-

State Total

78

3

21

26

*Morni block of district Panchkula not assessed due to complete hilly area.

9009—C.S.—H.G.P., Pkl.