(22)
Haryana Government Gazette
Published by Authority
© Govt. of Haryana
No. 3-2021]
CHANDIGARH, TUESDAY, JANUARY 19, 2021 (PAUSA 29, 1942 SAKA)
PART III
Notifications by High Court, Advertisement, Notices and Change of Name etc.
HARYANA GOVERNMENT
HARYANA ELECTRICITY REGULATORY COMMISSION
Notification
Dated 11th January, 2021
No. HERC/10/2005/4th Amendment/2021.— In exercise of the powers conferred on it by section 86 (1) (g)
read with section 181 of the Electricity Act 2003 (Act 36 of 2003) and all other powers enabling it in this behalf and
after previous publication, the Haryana Electricity Regulatory Commission makes the following regulations to amend
the Haryana Electricity Regulatory Commission (Fee) Regulations, 2005 as under: -
1.
Short title, commencement, and interpretation.
(1)
These Regulations may be called the Haryana Electricity Regulatory Commission (Fee) Regulations, 2005,
4th Amendment Regulations, 2021.
(2)
These Regulations shall come into force on the date of their publication in the Haryana Government
Gazette.
(3)
These Regulations shall extend to whole of the State of Haryana.
2.
The following Schedule of Fee shall replace the existing schedule of fee appended to the principle
regulation notified on 6th January, 2005.
Sr. No.
Particulars
Prescribed Fee
1.
Application Processing fee for grant of license
under section 14 of the Act as prescribed by
the State Government vide “Payment of Fees
for Processing of Application for Grant of
License Rules, 2005”.
As prescribed by Haryana Government and
amended from time to time.
2.
Annual Fee for Transmission/ Distribution/ Trading Licensees
(a)
Annual Fees for determination of tariff / true-up and midterm review for Transmission /
Distribution/ Retail Supply / Trading Licensees.
(i)
Transmission Licensee
10.05% of the amount of the Annual Revenue
Requirement (ARR) including non–tariff income
of the previous year subject to minimum of
Rs. 25 lakh and maximum of Rs. 3.5 Crore
PART III]
HARYANA GOVT. GAZ., JAN. 19, 2021 (PAUS. 29, 1942 SAKA)
23
Sr. No.
Particulars
Prescribed Fee
(ii)
Distribution Licensee
10.05% of the amount of the Annual Revenue
Requirement (ARR) including non–tariff income
of the previous year subject to minimum of Rs.
25 lakh and maximum of Rs. 3.5 Crore
(iii)
Intra-State Trading Licensee
10.05% of the value of power traded during the
previous year subject to minimum of Rs. 25 lakh
and maximum of Rs. 3.5 Crore.
(iv)
Inter-State Trading Licensee
10.05% of the value of power traded during the
previous year in relation to the intra-state trading
undertaken by the petitioner in the State of
Haryana subject to minimum of Rs. 25 lakh and
maximum of Rs. 3.5 Crore.
(b)
Licensees selected through competitive bid
process
(i)
Transmission licensee
10.05% of the amount of the Annual Revenue of
the year based on bid adjusted for escalation
factors, subject to a minimum of Rs. 25 lakh and
maximum of Rs. 3.5 Crore.
(ii)
Distribution licensee
10.05% of the amount of the Annual Revenue of
the year based on bid adjusted for escalation
factors, subject to a minimum of Rs. 25 lakh and
maximum of Rs. 3.5 Crore.
(c)
Deemed Licensee(s)
10.05% of the amount of the Annual Revenue of
the year based on the estimated energy to be
handled at input periphery of the petitioner
licensee and average ARR of Distribution
Licensees of the State per unit of the input energy
at input periphery of the Licensees for the
previous year. Subject to a minimum of Rs. 25
lakh and maximum of Rs. 3.5 Crore.
1For new applicant, first year projected ARR shall be the basis for determination of Annual Fee
subject to revision of fee corresponding to ARR determined by the Commission.
The annual fee shall be paid in advance at the commencement of the financial year.
3.
Petition for grant of deemed licensee status in
Haryana
Rs. Two lakhs
4.
Petition for approval of Business Plan
Rs. One (1) lakh
5.
Petition for approval of Capital Investment
Plan
Rs. One (1) lakh
6.
Petition
for
determination
of
additional
surcharge/FSA or any other charges to be
recovered from the consumers in case not
submitted along with the ARR
Rs. One (1) lakh.
7.
Application seeking prior approval under
section 17 of the Electricity Act, 2003.
(Except sale of Scrap)
20.01% of the value of the transaction for
which approval is sought, subject to a
minimum of Rs. 1 lakh and maximum of Rs. 30
lakh.
2when a part of asset is labelled as scrap by the licensees it is no longer part of the assets in use for
the normal business activity of the utility and therefore out of the ambit of Section 17 of the Act.
HARYANA GOVT. GAZ., JAN. 19, 2021 (PAUS. 29, 1942 SAKA)
PART III]
24
Sr. No.
Particulars
Prescribed Fee
8.
Application for amendment of license under
section 18 of the Electricity Act, 2003.
Rs. Two Lakhs
9.
Petition for determination of rates, charges,
terms and conditions under proviso to sub-
section (1) of section 36 of the Electricity
Act, 2003.
Rs. Two lakhs Fifty thousand (To be paid by
each party)
10.
Petition for adjudication of disputes relating
to providing of non- discriminatory open
access (Long Term and Medium Term) under
sub- section (47) of section 2 read with sections
9, 40 and or 42 of the Electricity Act, 2003 and
the regulations notified there under.
Rs. Two lakhs
11
Petition for determination of Tariff under
provisions of clause (a) of sub- section (1) of
section 62 of the Electricity Act, 2003.
A
Where annual determination of Tariff is
involved
(i)
a) Conventional Fuel based power plants
(coal, gas, liquid fuel etc.)
b) Hydro Stations (more than 25 MW
capacity)
i.
Upto 5 MW Rs. 1 Lakh
ii.
Upto 25 MW Rs. 5 Lakh
iii. Above 25 MW Rs. 10,000/- per MW
of the Installed/ allocated Capacity subject
to Minimum fee of Rs. 25 Lakh and
Maximum fee of Rs. 3.5 Cr.
(ii)
a) Non-conventional and/or Renewable
sources of energy including
co- generation-based power plants
b) Hydro Stations (upto 25 MW capacity)
(Also see Note 1)
i.
Upto 5 MW Rs. 1 Lakh
ii.
Upto 25 MW Rs. 5 Lakh
iii. Above 25 MW Rs. 5,000/- per MW of
the Installed/ allocated Capacity subject to
a Minimum fee of Rs. 25 Lakh and
Maximum fee of Rs. 1.75 Cr.
B
Tariff determination for Generating Stations
other than those covered under “A” above
(i)
a) Conventional Fuel based power plants
(coal, gas, liquid fuel etc.)
b) Hydro Stations (more than 25 MW
capacity)
i.
Upto 5 MW Rs. 5 Lakh
ii. Upto 25 MW Rs. 50 Lakh
iii. Above 25 MW Rs 50,000/- per MW
of the installed/ allocated Capacity subject
to a Minimum fee of Rs. 1 crore and
Maximum fee of Rs. 3.5 Cr.
(ii)
a) Non-conventional
and/or
Renewable
sources
of
energy
including
co- generation-based power plants.
b) Hydro Stations (upto 25 MW capacity)
(Also see Note 1)
i.
Upto 5 MW Rs. 5 Lakh
ii. Upto 25 MW Rs. 50 Lakh
iii. Above 25 MW Rs. 25,000/- per MW
of the installed/ allocated Capacity subject
to a Minimum fee of Rs. 1 crore and
Maximum fee of Rs. 3.5 Cr.
12
Adoption of Tariff u/s 63 of the Act.
(i)
a) Conventional Fuel based power plants
(coal, gas, liquid fuel etc.)
b) Hydro Stations (more than 25 MW
capacity) (Also see Note 1)
i. Upto 5 MW Rs. 1 Lakh
ii. Upto 25 MW Rs. 10 Lakh
iii. Above 25 MW Rs. 2,000/- per MW of
the installed/ allocated Capacity subject to
a Minimum fee of Rs. 20 Lakh and
Maximum fee of Rs. 70 lakhs.
PART III]
HARYANA GOVT. GAZ., JAN. 19, 2021 (PAUS. 29, 1942 SAKA)
25
Sr. No.
Particulars
Prescribed Fee
(ii)
a) Non-conventional and/or Renewable
sources of energy including
co- generation-based power plants.
b) Hydro Stations (upto 25 MW capacity)
(Also see Note 1)
i.
Upto 5 MW Rs. 1 Lakh
ii. Upto 25 MW Rs. 10 Lakh
iii. Above 25 MW Rs. 1,000/- per MW
of the installed/ allocated Capacity subject
to a Minimum fee of Rs. 20 Lakh and
Maximum fee of Rs. 35 lakhs.
(iii)
Transmission Service Agreement
Rs. 500 per MW with a Minimum fee of
Rs. 50,000/- (Fifty thousand) and Maximum of
Rs. 2 Lakh
13.
Application / Petition for approval of Power
Purchase Agreement / Power Sale Agreement /
Transmission Service Agreement including in
principle approval. However, fee deposited in
case of seeking in principle approval shall
be adjusted when final approval is sought.
(i)
a) Conventional Fuel based power plants
(coal, gas, liquid fuel etc.)
b) Hydro Stations (more than 25 MW
capacity) (Also see Note 1)
Rs. Ten thousand per MW of the Contracted
capacity with a Minimum of Rs. 50,000/-
(Fifty thousand) and Maximum of Rs. 25 Lakh.
(ii)
a) Non-conventional
and/or
Renewable
sources
of
energy
including
co-
generation-based power plants
b) Hydro Stations (less than 25 MW capacity)
(Also see Note 1)
Rs. Five thousand per MW of the Contracted
capacity subject to a Minimum of Rs. 50000/-
(Fifty thousand) and Maximum of Rs. 2 Lakh.
(iii)
Transmission Service Agreement
Rs. 2000 per MW subject to a Minimum of
Rs. 50,000/- (Fifty thousand) and maximum of
Rs. 2 Lakh.
14.
Petition
for
review
of
Order
of
the
Commission. (Also see Note 2)
(i)
Where fee is prescribed under this regulation
Rs. Two lakh or 50% of the Original Fee
whichever is less subject to a minimum fee of
Rs. 50,000/- (Fifty Thousand). However,
exemption is granted to category of Small
Consumers having a connected load below
20 kW for 20 (i), 20 (ii) and 20 (iii)c
(ii)
Where review is sought of Suo Motto Orders
Rs.50,000/ (Fifty thousand)
(iii)
Where review is sought of Order under 20(iv)
filed by any person other than the complainant
covered under 20(iv)
As per category wise fee mentioned under 20
(iii) – Others
(iv)
Where review is sought of Order under 20(iv)
filed by the complainant covered under 20(iv)
Nil
15.
Adjudication of dispute u/s 86 (1) (f) or u/s 35
Rs. 2,00,000/- (Two Lakhs)
16.
Request for inspection of documents / petition
disposed of or under consideration of the
Commission if permitted to be inspected
Rs. Five hundred per file/ per day.
17.
Request for obtaining certified copies of order/
petition disposed of or under consideration of
the Commission as may be permitted.
Rs. Five per page subject to a minimum of
Rs. Fifty.
18.
Petition by SLDC on any matter not covered
above.
Nil
HARYANA GOVT. GAZ., JAN. 19, 2021 (PAUS. 29, 1942 SAKA)
PART III]
26
Sr. No.
Particulars
Prescribed Fee
19.
Surcharge for delay in submission of the
Petition.
0.004% per day (15% p.a.) from due date
(if prescribed by the Commission) up to the
actual date of submission.
20.
Fee for any Application / Petition not covered
above.
(i)
In case the application/petition is filed by the
residents of the group housing society against
Management/ Developer/ RWA
Rs.1,000/- (One thousand)
(ii)
In case the application/petition is in larger
public interest for retail supply consumers.
(Also see Note 3)
Discretion of the Commission to exempt
(iii)
Others
a) By Utility / Licensee / deemed licensee /
person granted exemption from license.
Rs. 50,000/- (Rs. Fifty thousand)
b) By Institution/ Association/ Organization/
Company (Limited, Private Limited,
Partnership) Proprietorship/ Trust/Societies
Rs. 50,000/- (Rs. Fifty thousand)
c) Self Pleading Individual Consumer less
than 20 kw
Rs.1,000/- (Rs. One thousand)
d) Interlocutory Applications (IA)
Rs. 5,000/ (Rs. Ten thousand)
e) Others than (a) to (d) above
Rs. Rs. 50,000/- (Rs. Fifty Thousand)
iv)
3Complaint under section 142
or section 146
of Electricity Act, 2003 provided that the person
(complainant) consumes electricity for its own
use and not for commercial purpose.
Provided that in case review petition is filed by
any person other than the complainant covered
under 20(iv), fee for such review shall be as per
clause 14(iii)
Provided that in case review petition is filed by
the complainant covered under 20(iv), fee is
Nil.
Nil
3Complaint is a petition before the appropriate for a under the Consumer Act, and therefore,
borrowing the principle of law from there, its fee is kept as nil.
The cost of advertisement of public notices by the Commission in the newspapers in petition(s)
where comments/ objections of general public/ Stakeholders are required shall be borne by the
parties concerned if so ordered by the Commission.
Notes
1.
The classification of projects falling under Non-conventional and/or Renewable sources of energy is based on
the relevant provisions of the National Tariff Policy.
2.
Petition under the clause of removal of difficulty is not an application for review of Order. Such cases will be
covered in “20. Fee for any Application / Petition not covered above”.
3.
Where the discretion of the Commission is sought for exemption of fee, preliminary hearing shall be held
whether the matter qualifies for exemption or not.
4.
All fee should be rounded off to the nearest hundred Rupees except for fee at point 17.
BY ORDER OF THE COMMISSION
[18-1]
Panchkula:
Director/Tariff,
The 28th December, 2020.
HERC.
9021—C.S.—H.G.P., Pkl.