HARYANA ELECTRICITY REGULATORY COMMISSION
BAYS NO.33-36, SECTOR-4, PANCHKULA-134113, HARYANA
Notification
The 15th January, 2024
No. HERC/29/2014/4thAmendment/2024.— The Haryana Electricity Regulatory Commission, in exercise of
the powers conferred under Sub-Section 2 (t, v) of Section 181 read with Section 43, 46 & 47 of the Electricity Act
2003 and all other powers enabling it in this behalf, after previous publication, makes the following regulations:
1.
Short title, Commencement and Interpretation:
1.1.
This Regulation shall become the part of the Haryana Electricity Regulatory Commission (Electricity
Supply Code) Regulation, 2014. (4th Amendment) Regulation, 2024.
1.2.
This amendment shall come into force with effect from the date of its publication in the Haryana
Government Gazette.
2.
Amendment to regulation4.4.3
Note given under Regulation 4.4.3 (2)(c) shall be substituted with the following:
Note:- In case of LT connections (other than domestic supply connections), where the transformer has been
installed by the consumer and is exclusively for his supply, the transformer if and when required to be
replaced/repaired for any reason including theft, shall be so replaced/repaired by sharing 20% of the cost by the
consumer and 80% by the licensee (for replacement of DT within warranty period) or 10% of the cost by the
94
HARYANA GOVT. GAZ., JAN. 16, 2024 (PAUS. 26, 1945 SAKA)
[PART III
consumer and 90% by the licensee (for replacement of DT beyond warranty period) except when the damage is due to
natural events including cyclone, floods, storms or other occurrences beyond consumer’s control, in which case the
licensee shall bear the entire cost of repair/replacement.
Provided that if the applicant chooses to get the work done at his cost, the licensee shall charge only
supervision charges at the rate of 1.5% of the estimated cost of such works as are to be finally handed over to the
distribution/transmission licensee or as approved by the Commission.
Provided further that if the applicant chooses to get the work done on his own, he shall get the work done
within the timeframe specified under Regulations 4.4.6 and 4.4.7, subject to proviso under Regulations 4.4.4 (5) and
4.4.7, failing which the licensee may, on giving 15 days’ notice, treat the application for supply as cancelled.
By order of the Commission
(Sd.)...,
Secretary,
Haryana Electricity Regulatory Commission.