The 30th January, 2026

No. 23/13/2022-5E.— In exercise of power conferred under section 67 & 68 of the Electricity Act 2003, the

State Government hereby makes following provisions for determination of compensation towards the damages and

payment for Right of Way (RoW) as stipulated in section 12 to 18 of Indian Electricity Act, 1910 read with section 10

& 16 of the Indian Telegraph Act, 1885 for laying of 66kV and above Intra-State Transmission System (In-STS) lines

in the state of Haryana. This policy shall supersede and substitute the earlier policy for determination of compensation

towards the ‘damages’ for laying of 66kV and above overhead Transmission lines issued vide Notification

No. 23/13/2022-5E dated 10.07.2024.

Determination of Compensation:

(I)

Crop Compensation: Compensation be paid to the farmers for damage caused to their crops at the following

stages obtaining the certificate of Patwari (or any higher rank officer of Revenue Department) of the area

concerned.

Sr.

No.

Stage of Work

Compensation Determination

i

Casting of Tower

Foundation

On the basis of certificate issued by Patwari (or any higher

rank officer of Revenue Department) containing the

following minimum information:

(i)

Name of entitled person

(ii)

Area affected (in Acres)

(iii)

Nature of crop damaged

(iv)

Calculation of Yield

(v)

Rate of Crop Taken into Account

(vi)

Amount of Compensation Determined

(Area of crops damaged in acre X rate of damaged crop

per Acre X Crop yield per acre)

ii

Erection of Transmission

Tower

iii

Stringing of Conductor

Note: Compensation shall be paid into the Bank Account of the entitled person on the basis of certificate

issued by Patwari (or any higher rank officer of Revenue Department).

194

HARYANA GOVT. GAZ. (EXTRA.), JAN. 30, 2026 (MAGH. 10, 1947 SAKA)

(II)

Compensation for diminution in value of land due to Installation of Transmission Line:

(1) Applicability: The compensation shall be payable only for Intra-State Transmission System Lines

(In-STS) supported by a tower base of 66kV Voltage level and above, and not for sub-transmission and

distribution lines below 66kV.

(2)

Determination of Compensation: The compensation shall ordinarily be based on the Circle

rate/Collector rate/Guideline value/Stamp Act rates of the land, except where the market rate exceeds

the Circle rate/Collector rate/Guideline value/Stamp Act rates. In such instances, the land value shall be

determined based on the prevailing market rate as ascertained by theDistrict Magistrate/District

Collector/Deputy Commissioner through Market Rate Committee (MRC) by following the Land

Evaluation Methodology (Annexure-A).

However, the “Market Rate Committee (MRC)” shall submit its recommendation to Deputy

Commissioner to decide the rate of land to work out the compensation to be paid to the land owners on

account of diminution of land value for laying of 66kV & above Transmission lines in the state of

Haryana.

The determined land value shall serve as the basis for compensation and shall be promptly

communicated by the respective District Magistrate/District Collector/Deputy Commissioner.

(3)

Tower Base Compensation: Compensation for the tower base area shall be 200% of the land value.

The tower base area shall be the area enclosed by the four legs of the tower at ground level, plus an

additional one (1) meter extension on each side.

(4)

RoW Corridor Compensation: The compensation amount for Right-of-Way (RoW) corridor shall be

as follows for transmission lines:-

i.

30% of the land value in rural areas.

ii.

60% of the land value in municipal corporations and metropolitan areas notified by the State

Government.

iii.

45% of the land value for municipalities, nagarpanchayats and all other urban planning areas

notified by the State Government.

Note - ‘Urban Planning Area’ as mentioned above would have the same effect and meaning as an

‘Urban Area’ defined in section 2(O) of The Haryana Development and Regulation of Urban Areas

Act, 1975 (as amended from time to time) and is presently defined as under:-

“Any area of land within the limits of a municipal area or notified area or the Faridabad

Complex or situate within five kilometres of the limits thereof, or any other area where, in the

opinion of the Government, there is a potential for building activities and the Government by

means of notification declares.”

*

In case of any doubt regarding whether any land is part of an urban area or not - the

opinion of Town & Country Planning department, Haryana shall be obtained and shall

be final & binding.

Land within the RoW corridor, as defined in Schedule VII of the Central Electricity Authority (Technical

Standards for Construction of Electrical Plants and Electric Lines) Regulations, 2022 (Annexure-B) as

amended from time to time, shall be eligible for compensation. This compensation will address the

potential diminution of land value due to the presence of overhead lines or underground cables within the

RoW corridor. No construction activity of any kind would be permitted within the RoW of the

transmission line.

(5)

Alternate Compensation: In areas where land owner/owners have been offered/accepted alternate

mode of compensation by Corporation /Municipality concerned under Transfer of Development Rights

(TDR) policy of the State, the licensee /utility shall deposit compensation amount as per (3) & (4)

above with the Corporation/ Municipality/ Local Development Authority or the State Government.

(6)

Areas with RoW constraints: When laying transmission lines in areas with RoW constraints, various

technologies can be considered to optimize the use of space. These technologies are outlined in the

Central Electricity Authority (Technical Standards for Construction of Electrical Plants and Electric

Lines) Regulations, 2022. Some options include: steel pole structures, narrow-based lattice towers,

multi-circuit and multi-voltage towers, single-side stringing with lattice or steel poles, XLPE

underground cables, Gas Insulated Lines (GIL), compact towers with insulated cross arms, Voltage

Source Converter (VSC) based High Voltage Direct Current (HVDC) systems, and more.

HARYANA GOVT. GAZ. (EXTRA.), JAN. 30, 2026 (MAGH. 10, 1947 SAKA)

195

(7)

Landowner Identification: During the check survey conducted at the execution stage, the names of

landowners whose property falls within the transmission line's Right-of-Way (RoW) will be

documented. This process shall adhere to the Regulation 84 (8) of the Central Electricity Authority

(Technical Standards for Construction of Electrical Plants and Electric Lines) Regulations, 2022.

(8)

Compensation Payment: Compensation payment shall be one-time and upfront. Compensation shall

be paid into the Bank Account of the entitled person on the basis of certificate issued by Patwari (or any

higher rank officer of Revenue Department) containing the following minimum information:

(i)

Name of the entitled person.

(ii)

Address of the entitled person.

(iii)

Bank details of the entitled person.

(9)

Pass through by HERC: If the actual RoW compensation paid by the TSP due to implementation of

these guidelines or the extant guidelines/ policy of the appropriate government differs from the base

RoW compensation determined for the In-STS Scheme as per Tariff Based Competitive Bidding

(TBCB) Guidelines, the same shall be eligible for pass through under Change in Law (CIL) by the

Haryana Electricity Regulatory Commission (HERC).

(III)

This policy shall become effective from the date of publication of notification in Haryana Government

Gazette. It is made clear that policy shall apply prospectively to all works, including ongoing works, which are

yet to be completed.

(IV)

This policy shall be applicable forIntra-State transmission (In-STS) lines of 66kV voltage level and above in

the State to be constructed by HVPNL/PGCIL/other Central/State Government agencies and all private

entities.

Enclosure: Annexure-A & B

SHYAMAL MISRA,

Additional Chief Secretary to Government Haryana,

Energy Department.

196

HARYANA GOVT. GAZ. (EXTRA.), JAN. 30, 2026 (MAGH. 10, 1947 SAKA)

Annexure - A

1.

Committee for Market Rate Determination -

(a)

The market rate of land shall be determined by the following Market Rate Committee (MRC) based

on the valuation by independent land valuers:

(i)

District Magistrate/District Collector/Deputy Commissioner or his/her nominee (not below

Sub-Divisional Magistrate) - Chair

(ii)

Representative of land owners- Member

(iii)

Nominee of Intra State Transmission Service Provider (TSP) (if any) – Member

(iv)

Superintending Engineer/TS, HVPNL of the concerned Area - Member

The District Magistrate/District Collector/Deputy Commissionermay co-opt one additional

member as may be required.

(b)

The Market Rate Committee (MRC) shall give its recommendation to the Deputy Commissioner in

respect of the rate of land to work out the compensation to be paid to the land owners on account of

diminution of land value for laying of 66kV & above Transmission lines in the state of Haryana. The

land owner in whose land the towers / line is proposed to be installed will be afforded /granted

opportunity of being heard by the committee, in case he/she requests for the same.

(c)

The final decision will be taken by Deputy Commissioner after considering the recommendations of the

“Market Rate Committee (MRC)”. The determined land value shall serve as the basis for

compensation and shall be promptly communicated by the respective Deputy Commissioner to the

executing agency.

2.

The Nodal department shall be the Energy Department and Managing Director, HVPNL shall coordinate

expeditious implementation of this policy for all such projects covered under this policy.

3.

Land Valuation Methodology

(a)

MRC shall appoint two valuers – one nominated by the HVPNL/TSP and the other by the

representative of landowners. The MRC shall engage the land valuers empanelled by the Insolvency

and Bankruptcy Board of India (IBBI) as per the list available at website of IBBI (https://ibbi.gov.in).

The valuers should preferably be from the same State or, if an adequate pool of valuers is not available,

from adjoining States. The reference market rate shall be determined as specified below:-

(i)

If the difference in the market rates worked out by valuers is less than 20% over the lowest

value, then average value of the two valuations shall be taken as the reference market rate.

(ii)

If the difference exceeds 20%, MRC may negotiate the reference market rate.

(iii)

Else, or if negotiation fails, then MRC shall engage a third valuer, and the reference market

value shall be determined as the average of the two closest valuations.

(b)

The assessed reference market rate shall serve as the basis for determination of market rate by the

MRC.

(c)

The professional fee/charges of the land valuer shall be borne by the TSP and shall form part of the

RoW compensation cost.

4.

Appeal:-The Divisional Commissioner having jurisdiction, is the single Appellate Authority. He/She may

co-opt/seek assistance of any officer in his/her jurisdiction in deciding the appeal(s). The procedure of the

appeal shall be summary and shall be compliant to the principles of natural justice and in good faith.

-------

HARYANA GOVT. GAZ. (EXTRA.), JAN. 30, 2026 (MAGH. 10, 1947 SAKA)

197

Annexure - B

Right of Way (RoW) for normal route, forest area, populated area and approach section near substation as

stipulated in Schedule-VII of the CEA Regulation 2022.

1.1

A generic way to define Right of Way (RoW) is ‘a path that you are legally allowed to use to cross land that

does not belong to you’. In case of electric transmission lines RoW is basically a strip of land required by a

utility for constructing, maintaining and protecting its transmission line. RoW is sometimes also referred as

Transmission Corridor. It is the minimum safety corridor around power lines to meet the requisite safety

clearances as well as the electromagnetic field exposure limits.

1.2

Schedule-VII of Central Electricity Authority (Technical Standards for Construction of Electrical Plants and

Electric Lines) Regulations, 2022 provides details of Right-of-way for transmission lines of different voltage

levels (with specific conductor type and configuration, design span and string arrangement) traversing through

normal terrain or route without constraint, forest area, urban area, populated area and approach section near

substation as under:

Table:

Voltage

level

Configuration

Conductor

type

Terrain

Design

Span

String Type

RoW width in m

(for compensation

purpose)

765 kV

D/C

Vertical

ACSR

ZEBRA

Normal route

without constraint

400

"I" String

67

"V" String

Tension

Forest

300

"V" String

56

Tension

Urban area /

populated area /

approach section

near substation

250

"V" String

54

Tension

198

HARYANA GOVT. GAZ. (EXTRA.), JAN. 30, 2026 (MAGH. 10, 1947 SAKA)

Voltage

level

Configuration

Conductor

type

Terrain

Design

Span

String Type

RoW width in m

(for compensation

purpose)

765 kV

S/C

Vertical /Delta

ACSR

BERSIMIS

Normal route

without constraint

400

"I" String

64

"V" String

Tension

Forest

300

"V" String

54

Tension

Urban area /

populated area /

approach section

near substation

250

"V" String

52

Tension

765 kV

S/C

Horizontal

ACSR

BERSIMIS

Normal route

without con

straint

400

"I" String

74

"V" String

Tension

Forest

300

"V" String

65

Tension

Urban area /

populated area /

approach section

near substation

250

"V" String

62

Tension

±800

kV

HVDC

Horizontal

ACSR

Lapwing

Normal route

without

constraint/Forest/

Urban

400

"Y" String

69

±500

kV

HVDC

Horizontal

ACSR

Lapwing

Normal route

without

constraint/Forest/

Urban

400

"V" String

52

400 kV

D/C

Vertical

ACSR

MOOSE

Normal route

without constraint

400

"I" String

46

"V" String

Tension

Forest

300

"V" String

40

Tension

Urban area /

populated area /

approach section

near substation

250

"V" String

38

Tension

400 kV

S/C

Horizontal/

Vertical

ACSR

MOOSE

Normal route

without constraint

400

"I" String

52

"V" String

Tension

Forest

300

"V" String

47

Tension

Urban area /

populated area /

approach section

near substation

250

"V" String

44

Tension

HARYANA GOVT. GAZ. (EXTRA.), JAN. 30, 2026 (MAGH. 10, 1947 SAKA)

199

Voltage

level

Configuration

Conductor

type

Terrain

Design

Span

String Type

RoW width in m

(for compensation

purpose)

1200 kV

Horizontal

ACSR

Moose

Normal route

without

constraint/Forest/

Urban

400

"V" String

89

220 kV

D/C

Vertical

ACSR

ZEBRA

Normal route

without constraint

350

"I" String

32

"V" String

Tension

Forest

300

"V" String

28

Tension

Urban area /

populated area /

approach section

near substation

200

"V" String

24

Tension

132 kV

D/C

Vertical

ACSR

PANTHER

Normal route

without constraint

320

"I" String

25

"V" String

Tension

Forest

200

"V" String

21

Tension

Urban area /

populated area /

approach section

near substation

150

"V" String

19

Tension

110 kV

D/C

Vertical

ACSR

PANTHER

Normal route

without constraint

305

"I" String

22

"V" String

Tension

Forest

200

"V" String

19

Tension

Urban area /

populated area /

approach section

near substation

150

"V" String

17

Tension

66 kV

Vertical

ACSR

PANTHER

Normal route

without constraint

250

"I" String

18

"V" String

Tension

Forest

150

"V" String

14

Tension

Urban area /

populated area /

approach section

near substation

100

"V" String

13

12390—C.S.—H.G.P., Pkl.