(193)
Haryana Government Gazette
EXTRAORDINARY
Published by Authority
© Govt. of Haryana
No. 16-2026/Ext.] CHANDIGARH, FRIDAY, JANUARY 30, 2026 (MAGHA 10, 1947 SAKA)
HARYANA GOVERNMENT
ENERGY DEPARTMENT
Notification
The 30th January, 2026
No. 23/13/2022-5E.— In exercise of power conferred under section 67 & 68 of the Electricity Act 2003, the
State Government hereby makes following provisions for determination of compensation towards the damages and
payment for Right of Way (RoW) as stipulated in section 12 to 18 of Indian Electricity Act, 1910 read with section 10
& 16 of the Indian Telegraph Act, 1885 for laying of 66kV and above Intra-State Transmission System (In-STS) lines
in the state of Haryana. This policy shall supersede and substitute the earlier policy for determination of compensation
towards the ‘damages’ for laying of 66kV and above overhead Transmission lines issued vide Notification
No. 23/13/2022-5E dated 10.07.2024.
Determination of Compensation:
(I)
Crop Compensation: Compensation be paid to the farmers for damage caused to their crops at the following
stages obtaining the certificate of Patwari (or any higher rank officer of Revenue Department) of the area
concerned.
Sr.
No.
Stage of Work
Compensation Determination
i
Casting of Tower
Foundation
On the basis of certificate issued by Patwari (or any higher
rank officer of Revenue Department) containing the
following minimum information:
(i)
Name of entitled person
(ii)
Area affected (in Acres)
(iii)
Nature of crop damaged
(iv)
Calculation of Yield
(v)
Rate of Crop Taken into Account
(vi)
Amount of Compensation Determined
(Area of crops damaged in acre X rate of damaged crop
per Acre X Crop yield per acre)
ii
Erection of Transmission
Tower
iii
Stringing of Conductor
Note: Compensation shall be paid into the Bank Account of the entitled person on the basis of certificate
issued by Patwari (or any higher rank officer of Revenue Department).
194
HARYANA GOVT. GAZ. (EXTRA.), JAN. 30, 2026 (MAGH. 10, 1947 SAKA)
(II)
Compensation for diminution in value of land due to Installation of Transmission Line:
(1) Applicability: The compensation shall be payable only for Intra-State Transmission System Lines
(In-STS) supported by a tower base of 66kV Voltage level and above, and not for sub-transmission and
distribution lines below 66kV.
(2)
Determination of Compensation: The compensation shall ordinarily be based on the Circle
rate/Collector rate/Guideline value/Stamp Act rates of the land, except where the market rate exceeds
the Circle rate/Collector rate/Guideline value/Stamp Act rates. In such instances, the land value shall be
determined based on the prevailing market rate as ascertained by theDistrict Magistrate/District
Collector/Deputy Commissioner through Market Rate Committee (MRC) by following the Land
Evaluation Methodology (Annexure-A).
However, the “Market Rate Committee (MRC)” shall submit its recommendation to Deputy
Commissioner to decide the rate of land to work out the compensation to be paid to the land owners on
account of diminution of land value for laying of 66kV & above Transmission lines in the state of
Haryana.
The determined land value shall serve as the basis for compensation and shall be promptly
communicated by the respective District Magistrate/District Collector/Deputy Commissioner.
(3)
Tower Base Compensation: Compensation for the tower base area shall be 200% of the land value.
The tower base area shall be the area enclosed by the four legs of the tower at ground level, plus an
additional one (1) meter extension on each side.
(4)
RoW Corridor Compensation: The compensation amount for Right-of-Way (RoW) corridor shall be
as follows for transmission lines:-
i.
30% of the land value in rural areas.
ii.
60% of the land value in municipal corporations and metropolitan areas notified by the State
Government.
iii.
45% of the land value for municipalities, nagarpanchayats and all other urban planning areas
notified by the State Government.
Note - ‘Urban Planning Area’ as mentioned above would have the same effect and meaning as an
‘Urban Area’ defined in section 2(O) of The Haryana Development and Regulation of Urban Areas
Act, 1975 (as amended from time to time) and is presently defined as under:-
“Any area of land within the limits of a municipal area or notified area or the Faridabad
Complex or situate within five kilometres of the limits thereof, or any other area where, in the
opinion of the Government, there is a potential for building activities and the Government by
means of notification declares.”
*
In case of any doubt regarding whether any land is part of an urban area or not - the
opinion of Town & Country Planning department, Haryana shall be obtained and shall
be final & binding.
Land within the RoW corridor, as defined in Schedule VII of the Central Electricity Authority (Technical
Standards for Construction of Electrical Plants and Electric Lines) Regulations, 2022 (Annexure-B) as
amended from time to time, shall be eligible for compensation. This compensation will address the
potential diminution of land value due to the presence of overhead lines or underground cables within the
RoW corridor. No construction activity of any kind would be permitted within the RoW of the
transmission line.
(5)
Alternate Compensation: In areas where land owner/owners have been offered/accepted alternate
mode of compensation by Corporation /Municipality concerned under Transfer of Development Rights
(TDR) policy of the State, the licensee /utility shall deposit compensation amount as per (3) & (4)
above with the Corporation/ Municipality/ Local Development Authority or the State Government.
(6)
Areas with RoW constraints: When laying transmission lines in areas with RoW constraints, various
technologies can be considered to optimize the use of space. These technologies are outlined in the
Central Electricity Authority (Technical Standards for Construction of Electrical Plants and Electric
Lines) Regulations, 2022. Some options include: steel pole structures, narrow-based lattice towers,
multi-circuit and multi-voltage towers, single-side stringing with lattice or steel poles, XLPE
underground cables, Gas Insulated Lines (GIL), compact towers with insulated cross arms, Voltage
Source Converter (VSC) based High Voltage Direct Current (HVDC) systems, and more.
HARYANA GOVT. GAZ. (EXTRA.), JAN. 30, 2026 (MAGH. 10, 1947 SAKA)
195
(7)
Landowner Identification: During the check survey conducted at the execution stage, the names of
landowners whose property falls within the transmission line's Right-of-Way (RoW) will be
documented. This process shall adhere to the Regulation 84 (8) of the Central Electricity Authority
(Technical Standards for Construction of Electrical Plants and Electric Lines) Regulations, 2022.
(8)
Compensation Payment: Compensation payment shall be one-time and upfront. Compensation shall
be paid into the Bank Account of the entitled person on the basis of certificate issued by Patwari (or any
higher rank officer of Revenue Department) containing the following minimum information:
(i)
Name of the entitled person.
(ii)
Address of the entitled person.
(iii)
Bank details of the entitled person.
(9)
Pass through by HERC: If the actual RoW compensation paid by the TSP due to implementation of
these guidelines or the extant guidelines/ policy of the appropriate government differs from the base
RoW compensation determined for the In-STS Scheme as per Tariff Based Competitive Bidding
(TBCB) Guidelines, the same shall be eligible for pass through under Change in Law (CIL) by the
Haryana Electricity Regulatory Commission (HERC).
(III)
This policy shall become effective from the date of publication of notification in Haryana Government
Gazette. It is made clear that policy shall apply prospectively to all works, including ongoing works, which are
yet to be completed.
(IV)
This policy shall be applicable forIntra-State transmission (In-STS) lines of 66kV voltage level and above in
the State to be constructed by HVPNL/PGCIL/other Central/State Government agencies and all private
entities.
Enclosure: Annexure-A & B
SHYAMAL MISRA,
Additional Chief Secretary to Government Haryana,
Energy Department.
196
HARYANA GOVT. GAZ. (EXTRA.), JAN. 30, 2026 (MAGH. 10, 1947 SAKA)
Annexure - A
1.
Committee for Market Rate Determination -
(a)
The market rate of land shall be determined by the following Market Rate Committee (MRC) based
on the valuation by independent land valuers:
(i)
District Magistrate/District Collector/Deputy Commissioner or his/her nominee (not below
Sub-Divisional Magistrate) - Chair
(ii)
Representative of land owners- Member
(iii)
Nominee of Intra State Transmission Service Provider (TSP) (if any) – Member
(iv)
Superintending Engineer/TS, HVPNL of the concerned Area - Member
The District Magistrate/District Collector/Deputy Commissionermay co-opt one additional
member as may be required.
(b)
The Market Rate Committee (MRC) shall give its recommendation to the Deputy Commissioner in
respect of the rate of land to work out the compensation to be paid to the land owners on account of
diminution of land value for laying of 66kV & above Transmission lines in the state of Haryana. The
land owner in whose land the towers / line is proposed to be installed will be afforded /granted
opportunity of being heard by the committee, in case he/she requests for the same.
(c)
The final decision will be taken by Deputy Commissioner after considering the recommendations of the
“Market Rate Committee (MRC)”. The determined land value shall serve as the basis for
compensation and shall be promptly communicated by the respective Deputy Commissioner to the
executing agency.
2.
The Nodal department shall be the Energy Department and Managing Director, HVPNL shall coordinate
expeditious implementation of this policy for all such projects covered under this policy.
3.
Land Valuation Methodology
(a)
MRC shall appoint two valuers – one nominated by the HVPNL/TSP and the other by the
representative of landowners. The MRC shall engage the land valuers empanelled by the Insolvency
and Bankruptcy Board of India (IBBI) as per the list available at website of IBBI (https://ibbi.gov.in).
The valuers should preferably be from the same State or, if an adequate pool of valuers is not available,
from adjoining States. The reference market rate shall be determined as specified below:-
(i)
If the difference in the market rates worked out by valuers is less than 20% over the lowest
value, then average value of the two valuations shall be taken as the reference market rate.
(ii)
If the difference exceeds 20%, MRC may negotiate the reference market rate.
(iii)
Else, or if negotiation fails, then MRC shall engage a third valuer, and the reference market
value shall be determined as the average of the two closest valuations.
(b)
The assessed reference market rate shall serve as the basis for determination of market rate by the
MRC.
(c)
The professional fee/charges of the land valuer shall be borne by the TSP and shall form part of the
RoW compensation cost.
4.
Appeal:-The Divisional Commissioner having jurisdiction, is the single Appellate Authority. He/She may
co-opt/seek assistance of any officer in his/her jurisdiction in deciding the appeal(s). The procedure of the
appeal shall be summary and shall be compliant to the principles of natural justice and in good faith.
-------
HARYANA GOVT. GAZ. (EXTRA.), JAN. 30, 2026 (MAGH. 10, 1947 SAKA)
197
Annexure - B
Right of Way (RoW) for normal route, forest area, populated area and approach section near substation as
stipulated in Schedule-VII of the CEA Regulation 2022.
1.1
A generic way to define Right of Way (RoW) is ‘a path that you are legally allowed to use to cross land that
does not belong to you’. In case of electric transmission lines RoW is basically a strip of land required by a
utility for constructing, maintaining and protecting its transmission line. RoW is sometimes also referred as
Transmission Corridor. It is the minimum safety corridor around power lines to meet the requisite safety
clearances as well as the electromagnetic field exposure limits.
1.2
Schedule-VII of Central Electricity Authority (Technical Standards for Construction of Electrical Plants and
Electric Lines) Regulations, 2022 provides details of Right-of-way for transmission lines of different voltage
levels (with specific conductor type and configuration, design span and string arrangement) traversing through
normal terrain or route without constraint, forest area, urban area, populated area and approach section near
substation as under:
Table:
Voltage
level
Configuration
Conductor
type
Terrain
Design
Span
String Type
RoW width in m
(for compensation
purpose)
765 kV
D/C
Vertical
ACSR
ZEBRA
Normal route
without constraint
400
"I" String
67
"V" String
Tension
Forest
300
"V" String
56
Tension
Urban area /
populated area /
approach section
near substation
250
"V" String
54
Tension
198
HARYANA GOVT. GAZ. (EXTRA.), JAN. 30, 2026 (MAGH. 10, 1947 SAKA)
Voltage
level
Configuration
Conductor
type
Terrain
Design
Span
String Type
RoW width in m
(for compensation
purpose)
765 kV
S/C
Vertical /Delta
ACSR
BERSIMIS
Normal route
without constraint
400
"I" String
64
"V" String
Tension
Forest
300
"V" String
54
Tension
Urban area /
populated area /
approach section
near substation
250
"V" String
52
Tension
765 kV
S/C
Horizontal
ACSR
BERSIMIS
Normal route
without con
straint
400
"I" String
74
"V" String
Tension
Forest
300
"V" String
65
Tension
Urban area /
populated area /
approach section
near substation
250
"V" String
62
Tension
±800
kV
HVDC
Horizontal
ACSR
Lapwing
Normal route
without
constraint/Forest/
Urban
400
"Y" String
69
±500
kV
HVDC
Horizontal
ACSR
Lapwing
Normal route
without
constraint/Forest/
Urban
400
"V" String
52
400 kV
D/C
Vertical
ACSR
MOOSE
Normal route
without constraint
400
"I" String
46
"V" String
Tension
Forest
300
"V" String
40
Tension
Urban area /
populated area /
approach section
near substation
250
"V" String
38
Tension
400 kV
S/C
Horizontal/
Vertical
ACSR
MOOSE
Normal route
without constraint
400
"I" String
52
"V" String
Tension
Forest
300
"V" String
47
Tension
Urban area /
populated area /
approach section
near substation
250
"V" String
44
Tension
HARYANA GOVT. GAZ. (EXTRA.), JAN. 30, 2026 (MAGH. 10, 1947 SAKA)
199
Voltage
level
Configuration
Conductor
type
Terrain
Design
Span
String Type
RoW width in m
(for compensation
purpose)
1200 kV
Horizontal
ACSR
Moose
Normal route
without
constraint/Forest/
Urban
400
"V" String
89
220 kV
D/C
Vertical
ACSR
ZEBRA
Normal route
without constraint
350
"I" String
32
"V" String
Tension
Forest
300
"V" String
28
Tension
Urban area /
populated area /
approach section
near substation
200
"V" String
24
Tension
132 kV
D/C
Vertical
ACSR
PANTHER
Normal route
without constraint
320
"I" String
25
"V" String
Tension
Forest
200
"V" String
21
Tension
Urban area /
populated area /
approach section
near substation
150
"V" String
19
Tension
110 kV
D/C
Vertical
ACSR
PANTHER
Normal route
without constraint
305
"I" String
22
"V" String
Tension
Forest
200
"V" String
19
Tension
Urban area /
populated area /
approach section
near substation
150
"V" String
17
Tension
66 kV
Vertical
ACSR
PANTHER
Normal route
without constraint
250
"I" String
18
"V" String
Tension
Forest
150
"V" String
14
Tension
Urban area /
populated area /
approach section
near substation
100
"V" String
13
12390—C.S.—H.G.P., Pkl.