NOTIFICATION

Shimla, the 24th July, 2012

No.HPERC/428.—WHEREAS an adequate updated regulatory framework sensitive to the

requirements of various stakeholders is required to be in place to optimally harness the potential of

renewable sources, especially the small hydro, in Himachal Pradesh;

AND WHEREAS in accordance with the Himachal Pradesh Electricity Regulatory

Commission (Power Procurement from Renewable Sources and Co-generation by Distribution

Licensee) Regulations, 2007 the tariff and other related issues for SHPs upto 5 MW were

determined through an Order dated 18th December, 2007 which was further supplemented by

Orders dated 9th Feb., 2010 and 10th Feb., 2010;

91&jkti=@2012&27&7&2012

¼2443½

2444

jkti=] fgekpy izns'k] 27 tqykbZ] 2012@5 Jko.k] 1934

AND WHEREAS the existing Himachal Pradesh Electricity Regulatory Commission

(Power Procurement from Renewable Sources and Co-generation by Distribution Licensee)

Regulations, 2007, specify that the tariff for SHPs not exceeding 5 MW capacity is subject to

review after every 5 years and such revised tariff shall be applicable to the Power Purchase

Agreements POWER PURCHASE AGREEMENTs entered into after that date;

AND WHEREAS in view of the changing circumstances and experiences gained over the

years, it is felt that the existing regulations require substantial updation and rationalization and,

therefore, it has become necessary to put in place a new set of regulations in respect of renewable

energy sources in the State of Himachal Pradesh;

NOW, THEREFORE, the Himachal Pradesh Electricity Regulatory Commission in exercise

of the powers conferred under section 61, sub-section (1) of section 62, clauses (a), (b) and (e) of

sub-section(1) of section 86 and clause (zd) of sub-section (2) of section 181 of the Electricity Act,

2003 (36 of 2003) and all other powers enabling it in this behalf, hereby proposes to make the

following Himachal Pradesh Electricity Regulatory Commission (Promotion of Generation from

Renewable Energy Sources and Terms and Conditions for Tariff Determination) Regulations, 2012

and publishes the draft of the proposed Regulations, as required by subsection (3) of section 181 of

the said Act and by rule 3 of the Electricity (Procedure for Previous Publication) Rules, 2005 for

the information of all the persons likely to be affected thereby; and notice is hereby given that

the said draft Regulations will be taken into consideration after the expiry of thirty days from the

date of their publication in the Rajpatra, Himachal Pradesh, together with any objections or

suggestions which may be received in respect thereto within the aforesaid period.

The full text of the draft Regulations alongwith explanatory memorandum is available on

the Commission’s website www.hperc.org.

The objections or suggestions in this behalf should be addressed to the Secretary, Himachal

Pradesh Electricity Regulatory Commission, Keonthal Commercial Complex, Khalini, Shimla-

171002. The objections or suggestions can also be sent through e-mail at [email protected].

DRAFT REGULATIONS

CHAPTER-I

PRELIMINARY

1.

Short title and commencement.—(1) These Regulations may be called the

Himachal Pradesh Electricity Regulatory Commission (Promotion of Generation from the

Renewable Energy Sources and Terms and Conditions for Tariff Determination) Regulations, 2012.

(2)

These Regulations shall come into force on 18.12.2012 and, unless reviewed earlier

or extended by the Commission, shall remain in force till 31.3.2017.

2.

Definitions and Interpretation.—(1) In these Regulations, unless the context

otherwise requires,—

(a)

‘Act’ means the Electricity Act, 2003 (36 of 2003);

(b)

‘Auxiliary energy consumption' or 'AUX' in relation to a period in case of a

project means the quantum of energy consumed by auxiliary equipment of the

generating station, and transformer losses within the generating station, and/or

switchyard thereof, expressed as a percentage of the sum of gross energy generated

at the renewable energy generator terminals of all the units of the generating station;

2445

jkti=] fgekpy izns'k] 27 tqykbZ] 2012@5 Jko.k] 1934

(c)

‘Capital cost’ means the capital cost as defined in regulation 20;

(d)

‘Commission' means the Himachal Pradesh Electricity Regulatory Commission

referred to in sub-section (1) of section 82 of the Act;

(e)

‘Conduct of Business Regulations' means the Conduct of Business Regulations

specified by the Commission under subsection (1) of section 92 of the Act;

(f)

‘Control period or review period' means the period during which the norms for

determination of tariff specified in these Regulations shall remain valid;

(g)

‘Date of commencement of operation of the project’ means the date on which the

first unit of the project is synchronized with the grid for the first time;

(h)

‘Renewable energy generator’ means the person(s) generating or intending to

generate energy, including cogeneration, from renewable energy sources;

(i)

‘HIMURJA’ means the Himachal Pradesh Energy Development Agency set up by

the State Government for the development of the renewables;

(j)

'Installed capacity' or 'IC', for the purpose of tariff determination, means the

summation of the name plate capacities of all the units of the generating station,

(reckoned at the renewable energy generator terminals), or the capacity for which

the renewable energy renewable energy generator has executed implementation

agreement with the State Government, whichever is higher;

(k)

‘Interconnection facilities’ means all the facilities and works which shall include,

without limitation, switching equipment, protection control and metering devices

etc. and all the associated works (also including civil and electrical works), for the

incoming bay(s) for the project line(s) at the interconnecting sub-station of the

licensee and shall also include any other works like re-organisation of bays at the

interconnecting sub-station and associated civil works as may be required for

facilitating the said incoming bays;

(l)

'Inter-connection point' means the physical touch point where the project line(s)

and the allied equipments of the interconnection facilities, forming part of the

renewable energy project are connected, or are to be connected, with the

transmission system or distribution system, in accordance with the interconnection

agreement/connectivity agreement or power purchase agreement or the transmission

master plan/sub-plan of the State Transmission Utility/distribution licensee, as may

be relevant;

(m)

‘Licensee’ means a person to whom a licence has been granted or deemed to have

been granted by Commission under Section 14 of the Act;

(n)

'MNRE' means the Ministry of New and Renewable Energy of the Government of

India;

(o)

‘Net saleable energy’ in relation to a period and in respect of a project, means the

quantum of energy available for sale from that project at the interconnection point in

that period, after allowing auxiliary consumption, transformation losses in the

2446

jkti=] fgekpy izns'k] 27 tqykbZ] 2012@5 Jko.k] 1934

transformers at the generating station and its switchyard, the losses in project line(s)

upto the interconnection point and free power, if any, to the State Government;

(p)

‘Non fossil fuel based co-generation’ means the process in which more than one

form of energy (such as steam and electricity) are produced in a sequential manner

by use of biomass provided the project may qualify to be a co-generation project if it

fulfills the eligibility criteria as specified in clause (d) of Regulation 4;

(q)

'Operation and maintenance expenses' or 'O&M expenses' means the

expenditure incurred on operation and maintenance of the project, or part thereof,

and includes, without limitation, the expenditure on manpower, establishment

(including employees expense, administrative and general expenses), repairs, spares,

consumables, insurance and overheads as well as the taxes, duties and other levies

on any or all such activities;

(r)

'Project' means a generating station alongwith the evacuation system upto the

interconnection point, including interconnection facilities, and in the case of a small

hydro generating station includes, without limitation, all components of generating

facility such as dam, intake water conductor system, power generating station and

generating units of the scheme, as apportioned to power generation, renewable

energy generator transformers, step up transformers at power house switchyard and

evacuation system comprising of project lines and interconnection facilities;

(s)

‘Project line’ means the evacuation infrastructure from the generating station to the

interconnecting sub-station of the licensee, to be provided, operated and maintained

as a part of the project by the renewable energy generator(s) for the purpose of

evacuation of power from the project;

(t)

‘Renewable energy’ means the grid quality electricity generated from renewable

energy sources;

(u)

‘Renewable Energy Certificate mechanism’ or ‘REC mechanism’ means the

mechanism devised for the development of market in power from non-conventional

energy sources by issuance of transferable and saleable credit certificates under the

Central Electricity Regulatory Commission (Terms and Conditions for recognition

and issuance of Renewable Energy Certificate for Renewable Energy Generation)

Regulations, 2010, and the Himachal Pradesh Electricity Regulatory Commission

(Renewable Power Purchase Obligation and its Compliance) Regulations, 2010;

(v)

‘Renewable energy sources’ means renewable sources of energy such as small

hydro, wind, solar including its integration with combined cycle, biomass, bio fuel

cogeneration, urban or municipal waste and other such sources as approved by the

MNRE;

(w)

‘Small Hydro Project' or ‘SHP’ means a hydro power project with a station

capacity up to and including 25 MW and shall also include the Project Line(s) and

the Interconnection Facilities.;

(x)

‘Solar PV power’ means the Solar Photo Voltaic power project that uses sunlight

for direct conversion into electricity through Photo Voltaic technology;

2447

jkti=] fgekpy izns'k] 27 tqykbZ] 2012@5 Jko.k] 1934

(y)

‘Solar thermal power’ means the solar thermal power project that uses sunlight for

direct conversion into electricity through concentrated solar power technology based

on either line focus or point focus principle;

(z)

'Tariff period' means the period for which tariff is to be determined by the

Commission on the basis of norms specified under these Regulations;

(aa)

'Useful Life' in relation to a project shall mean the useful life of the following

duration from the date of commencement of operation of the project, namely:—

(a)

Wind energy power project

25 years

(b)

Biomas power project, non-fossil

20 years

fuel cogeneration

(c)

SHPs

40 years

(d)

Solar PV/Solar thermal power plant

25 years

(e)

any other renewable energy

as may be

technology approved by the MNRE;

fixed under

regulation 17

(ab)

'Year' means a financial year.

(2)

The words and expressions used in these Regulations and not defined herein, but

defined in the Act, shall have the meanings assigned to them in the Act; the words and expressions

used herein but not specifically defined in these Regulations or in the Act, but defined under any

law, passed by a competent Legislature and applicable to the electricity industry in the State, shall

have the meanings assigned to them in such law; the words and expressions used herein but not

specifically defined in the Regulations or in the Act or any law passed by a competent Legislature

shall have the meaning as is generally assigned to them in the electricity industry.

3. Scope and extent of application.—(1) Save as provided in sub-regulations (2) and (3),

these Regulations shall apply in all cases where tariff, for a generating station based on renewable

sources of energy, is to be determined by the Commission under section 62, read with section 86,

of the Act:

Provided that in cases of wind, SHPs, biomass power based on Rankine cycle, non-fossil

fuel based cogeneration projects, Solar PV, solar thermal power projects, biomass gasifier and

biogas power projects, these Regulations shall apply subject to the fulfilment of eligibility criteria

specified in regulation 4.

(2)

These Regulations shall not apply in the following cases:—

(i)

where long term agreement for disposal/use of energy have either already

been signed by the renewable energy generator or approved by the

Commission and the capacity of the project has not been enhanced

subsequent to signing/approval of such agreement;

(ii)

projects upto 100 kW, for which the Commission may determine tariff

through a separate order;

(iii)

where the tariff for a generating station or a unit has been determined

through transparent process of bidding in accordance with the guidelines

issued by the Central Government.

2448

jkti=] fgekpy izns'k] 27 tqykbZ] 2012@5 Jko.k] 1934

(3)

Notwithstanding anything contained in sub-regulations (1) and (2)—

(a)

where long term agreements have been executed between the renewable

energy renewable energy generators and the licensee before the setting up of

the Commission, the provisions of such agreements shall continue to be

applicable;

(b)

where, after the setting up of the Commission, the power purchase agreement

has been approved by the Commission prior to the commencement of these

regulations, the tariff shall be in accordance with the terms and conditions of

such approved power purchase agreement read with the Himachal Pradesh

Electricity Regulatory Commission (Power Procurement from Renewable

Sources and Cogeneration by Distribution Licensee), Regulations, 2007,

irrespective of the date on which such agreement is actually executed.

4.

Eligibility Criteria.—

(a)

Wind power project.—using new wind turbine renewable energy generators.

(b)

Small hydro project.—located at the sites approved by the State Government or its

agency using new plant and machinery, and installed power plant capacity to be

lower than or equal to 25 MW at single location.

(c)

Biomass power project based on Rankine cycle technology.—Biomass power

projects using new plant and machinery based on Rankine cycle technology and

using biomass fuel sources, provided use of fossil fuel is restricted only up to 15%

of total fuel consumption on annual basis.

(d)

Non-fossil fuel based co-generation project.—The project shall qualify to be

termed as a non-fossil fuel based co-generation project, if it is using new plant and

machinery and is in accordance with the definition and also meets the qualifying

requirement outlined below:—

Topping cycle mode of co-generation.—Any facility that uses non-fossil fuel

input for the power generation and also utilises the thermal energy generated for

useful heat applications in other industrial activities simultaneously:

Provided that for the co-generation facility to qualify under topping cycle mode, the

sum of useful power output and one half the useful thermal output be greater than 45% of

the facility’s energy consumption, during season.

Explanation.—For the purposes of this clause—

(i)

‘Useful power output’ is the gross electrical output from the renewable energy

generator. There will be an auxiliary consumption in the cogeneration plant itself

(e.g. the boiler feed pump and the FD/ID fans). In order to compute the net power

output it would be necessary to subtract the auxiliary consumption from the gross

output. For simplicity of calculation, the useful power output is defined as the gross

electricity (kWh) output from the renewable energy generator.

(ii)

‘Useful thermal output’ is the useful heat (steam) that is provided to the process by

the cogeneration facility.

2449

jkti=] fgekpy izns'k] 27 tqykbZ] 2012@5 Jko.k] 1934

(iii)

‘Energy consumption’ of the facility is the useful energy input that is supplied by the

fuel (normally bagasse or other such biomass fuel).

(iv)

‘topping cycle’ means a cogeneration process in which thermal energy produces

electricity followed by useful heat application in industrial activities.

(e)

Solar PV and Solar Thermal Power Project.—Based on Technologies approved

by the MNRE.

(f)

Biomass Gasifier based Power Project.—The project shall qualify to be termed as

a biomass gasifier based power project, if it is using new plant and machinery and

having a grid connected system that uses 100% producer gas engine, coupled with

gasifier technologies approved by the MNRE.

(g)

Biogas based Power Project.—The project shall qualify to be termed as a biogas

based power project, if it is using new plant and machinery and having grid

connected system that uses 100% biogas fired engine, coupled with biogas

technology for co-digesting agriculture residues, manure and other bio-waste as may

be approved by the MNRE.

CHAPTER-II

PROMOTION OF GENERATION FROM RENEWABLE ENERGY SOURCES

5.

Promotion of renewable energy sources.—(1) Any renewable energy renewable

energy generator who does not have an arrangement for disposal/use of energy from his project

may, with prior consent of the licensee and approval of the Commission, enter into a power

purchase agreement, on long term basis or under the REC mechanism, with the distribution licensee

as per the provisions of the relevant applicable regulations, read with regulation 3, or the renewable

energy generator may have open access to transmission system and/or distribution system of the

licensee, as the case may be, in accordance with the Himachal Pradesh Electricity Regulatory

Commission (Grant of Connectivity, Long-term and Medium-term Intra-State Open Access and

Related Matters) Regulations, 2010.

(2)

The renewable energy renewable energy generator, to whom connectivity with the

transmission or distribution system of the licensee has not already been granted, shall apply for

connectivity to the licensee atleast 24 months prior to intended date of such connectivity or within

such time frame as may be mutually agreed.

(3)

The licensee may, on receipt of the application, grant its approval to provide

interconnection point as per the power system master plan/subplan, as devised by the State

Transmission utility(STU)/ distribution licensee for various capacities of projects, duly keeping in

view the provisions in the agreements already executed or the mutual acceptance between the

licensee and the renewable energy renewable energy generator.

(4)

The renewable energy renewable energy generator shall, soon after finalisation of

the interconnection point or immediately in cases where the same has already been finalised,

execute an interconnection agreement with the State Transmission Utility and/or the intra-State

transmission licensee and /or distribution licensee owning the system where connectivity is to be

provided.

2450

jkti=] fgekpy izns'k] 27 tqykbZ] 2012@5 Jko.k] 1934

(5)

The licensee shall, after receipt of the estimated cost of the interconnection facilities,

provide appropriate facilities consistent with the grid connectivity standards laid down by the

Authority or as specified in the relevant Code—

(i)

in case where such facilities are to be provided at an existing sub-station, within a

maximum period of 18 months, unless agreed otherwise; and

(iii)

in case of the new sub-station, within such period as may be mutually agreed

keeping in view the time frame in which such new sub-station is to be

commissioned:

Provided that the renewable energy renewable energy generator shall give prior intimation,

at least 4 months before the expected date of commencement of operation of the project, to the

licensee about his intention and readiness to inject power and also regarding the arrangements

finalised by him for disposal of power beyond the interconnection point:

Provided further that the renewable energy renewable energy generator will have to comply

with the connectivity standards and the conditions as specified in the State Grid Code/Indian

Electricity Grid Code (IEGC) – 2010, the Electricity Distribution Code and/or any other

Standards/Codes as may be relevant.

(6)

In order to optimise the use of limited transmission/sub-transmission corridors or the

limited space at the sub-stations of the licensee, the renewable energy renewable energy generators

may, with the approval of the licensee, enter into a suitable arrangement for joint project line(s) for

two or more projects and inject power into the grid through the joint evacuation system in

accordance with the principles laid down from time to time, by the Commission.

(7)

Notwithstanding anything in the preceding sub-regulation (6) where there are right

of way problems or there are space limitations at the sub-station of the concerned licensee, the

licensee may require the renewable energy renewable energy generators to enter into suitable

arrangement for joint project line(s) for two or more projects and inject power into the grid through

the joint evacuation system.

(8)

The renewable energy renewable energy generators may, in consultation with and

also with the prior approval of the licensee, augment or establish, on behalf of the licensee, the

transmission/distribution system beyond the interconnection point, on build and transfer basis, as

per best industry practices and the expenditure so incurred by the renewable energy renewable

energy generators and approved by the licensee shall be repaid by the licensee, alongwith interest,

in five equal installments, spread over a period not exceeding 5 years commencing from one year

after the date of commissioning of such works, and such expenditure shall be allowed as a pass

through to the licensee:

Provided that if such works are not a part of the Capital Expenditure Plan (CAPEX PLAN)

approved by the Commission, then the necessary approval for the CAPEX PLAN for the same shall

be obtained by the licensee from the Commission before according approval to any such

arrangement.

6.

Grid Connectivity.—Mechanism for grid connectivity shall be as under—

(a)

the renewable energy renewable energy generator shall construct, operate and

maintain the project line(s) at his cost;

2451

jkti=] fgekpy izns'k] 27 tqykbZ] 2012@5 Jko.k] 1934

(b)

the licensee shall, at the cost of renewable energy renewable energy generator,

provide, operate and maintain the interconnection facilities;

(d)

the transmission licensee and/or the distribution licensee shall bear the cost of

augmentation/establishment of network beyond the inter-connection point under the

CAPEX PLAN and the new or the augmented network shall form part of the assets

of the transmission or the distribution licensee, as the case may be.

7.

Coordination committee.—The Commission may constitute a coordination

committee to facilitate coordination among the State Transmission Utility, transmission licensee,

distribution licensee, HIMURJA and Directorate of Energy of the State Government for evacuating

power from renewable energy projects.

CHAPTER-III

TARIFF DETERMINATION

GENERAL PRINCIPLES

8.

Power Purchase Agreement.—(1) In case of the projects covered under these

Regulations, the renewable energy renewable energy generator or the distribution licensee may

offer to sell/purchase power in any of the following manner:—

(i)

for the entire tariff period starting from the date of commencement of operation of

the project, by availing any of the available tariff option under regulation 12;

(ii)

for the mutually agreed period(s) under the REC mechanism at a rate not exceeding

the weighted average pooled price for the relevant previous year in accordance with

the REC mechanism or any such other rate as may be decided by Commission under

REC mechanism;

(iii)

for the balance part of the tariff period, after having sold power initially under the

REC mechanism, in accordance with the provisions of regulation 15;

(iv)

in any other manner as may be mutually agreed in accordance with provisions of

these Regulations:

Provided that the distribution licensee shall endeavour to resort to competitive bidding

which, to start with, may be done separately for each type of renewable technology.

(2)

In the event of their arriving at a mutual understanding on various issues of the

Power Purchase Agreement, including the tariff option under regulation 12, the parties shall file a

joint petition before the Commission for approval of the proposed Power Purchase Agreement and

shall consequently execute the requisite Power Purchase Agreement after approval of the

Commission:

Provided that if the parties have arrived at a mutual understanding on the various issues of

the Power Purchase Agreement, as aforesaid, and the renewable energy renewable energy generator

requires a Power Purchase Agreement to achieve the financial closure of the Project, the parties

may file joint petition for approval of the proposed Power Purchase Agreement before the financial

closure.

2452

jkti=] fgekpy izns'k] 27 tqykbZ] 2012@5 Jko.k] 1934

9.

Control period or review period.—(1) The control period for the SHPs under these

Regulations shall start from the 18th day of December, 2012 and shall end on the 31st day of

March, 2017:

Provided that the technology specific parameters for the renewable energy sources, other

than SHPs, may be fixed for such durations and reviewed at such intervals, as the Commission may

find appropriate in accordance with regulation 17.

(2)

The tariff(s) determined under these Regulations for the renewable energy

generation project(s) or for a category thereof, to which these Regulations are applicable, shall,

unless amended or revised under regulation 19, continue to be applicable till the expiry of the tariff

period as specified in regulation 10.

(3)

The revision of the Regulations for the next control period shall be undertaken six

months prior to the end of the control period and in case the revised Regulations are not notified

before the end of the control period, the tariff norms laid down under these Regulations shall,

subject to adjustments under the revised Regulations, continue to remain applicable until the

notification of the revised Regulations.

10.

Tariff period.—The duration of tariff period in case of SHPs shall be 40 years and

for other renewable technologies the Commission may fix the same under regulation 17.

11.

Tariff design.—(1) The single part levellised tariff structure shall be followed for

the renewable energy technologies:

Provided that for renewable energy technologies having fuel cost component, like biomass

power projects and non-fossil fuel based cogeneration, single part tariff with two components, i.e.

fixed cost component and fuel cost component, shall be determined.

(2)

The following fixed cost components shall be included for determining the tariff:—

(a)

Return on equity;

(b)

Interest on loan capital;

(c)

Depreciation;

(d)

Interest on working capital; and

(e)

Operation and maintenance expenses.

(3) The generic or project specific tariff shall be determined on levellised basis for the tariff

period:

Provided that tariff for renewable energy technologies, having single part tariff with two

components, referred to in the proviso to sub-regulation (1), shall be determined on levellised basis

for the tariff period in respect of the fixed cost component and the fuel cost component shall be

specified on year of operation basis.

(4)

For the purpose of levellised tariff computation, the discount factor equivalent to the

post tax weighted average cost of capital shall be considered.

12.

Tariff options/applicability.—(1) The following tariff options, subject to mutual

acceptance of both the parties, shall be available to the renewable energy renewable energy

generator and the distribution licensee, intending to sell/ purchase power from SHPs for the entire

useful life of the project,—

2453

jkti=] fgekpy izns'k] 27 tqykbZ] 2012@5 Jko.k] 1934

(i)

to be governed by the generic levellised tariff to be determined by the Commission,

in accordance with the regulation 13, for the control period in which the Power

Purchase Agreement for the project is approved.

(ii)

to be governed by project specific levellised tariff to be determined by the

Commission in accordance with the regulations 14 and 18, including the exit options

available thereunder to the parties,

(iii)

to be governed by any other tariff, as may be mutually agreed by them with the prior

approval of the Commission, in accordance with the regulation 41.

(iv)

to be governed by the process of competitive bidding in cases where the licensee

resorts to competitive bidding.

(2)

Where, after sale of net saleable energy to the licensee as per the Power Purchase

Agreement(s) approved by the Commission under REC mechanism in the initial periods, the net

saleable energy is to be sold to the distribution licensee for the residual period of the useful life of

the project, the tariff for such sale for such residual period shall be regulated in accordance with the

regulation 15.

(3)

Where, after execution of a long term Power Purchase Agreement, the capacity of

the project is enhanced with the approval of the State Government, the tariff shall be regulated

under regulation 16.

(4)

In case of the renewable energy sources, other than SHPs, the tariff options, as

provided in regulation 17, shall be available to the parties intending to enter into Power Purchase

Agreement for sale/purchase of power.

(5)

The parties shall, while arriving at a mutual understanding about sale/purchase of

power, also mutually decide the tariff option to be adopted, and shall, before submitting the joint

petition for approval of the proposed Power Purchase Agreement under regulation 8, also reflect

the same in the proposed Power Purchase Agreement:

Provided that the tariff option adopted in the Power Purchase Agreement shall be

irrevocable and binding.

13.

Generic levellised tariff.—(1) The Commission shall determine separate generic

levellised tariffs for each category of SHPs, as referred to in regulation 32, within 90 days from the

date of commencement of these Regulations by taking into account the norms specified under these

Regulations:

Provided that in case of renewable energy technologies, other than SHPs, the Commission

may fix the generic levellised tariff in accordance with the regulation 17.

(2)

The tariff being normative, any shortfall or gain due to performance or any other

reasons is to be borne/retained, as the case may be, by the renewable energy renewable energy

generator and no true up of any parameter, including additional capitalisation for whatsoever

reasons, shall be taken up during the validity of the tariff except for the specific provisions in these

Regulations.

(3)

Where the parties have, as per the Power Purchase Agreements executed by them,

opted for generic levellised tariff or the same is otherwise applicable under regulation 15, the

2454

jkti=] fgekpy izns'k] 27 tqykbZ] 2012@5 Jko.k] 1934

generic levellised tariff determined for the control period under sub-regulations (1) shall be

applicable for all the projects of that category for which the Power Purchase Agreements are

approved by the Commission in that control period.

14.

Project specific levellised tariff.—(1) Where the parties have mutually agreed, in

the Power Purchase Agreement executed by them, for a project specific levellised tariff, the

Commission shall determine such tariff taking into consideration—

(i)

prudent capital cost as may be admitted by the Commission duly keeping in view

normative capital cost specified in these Regulations, the cost approved in the

Detailed Project Report, the actual expenditure incurred as per auditor’s certificate,

the information furnished under regulation 18:

Provided that in case of delay in execution of the project, the Commission shall consider the

time over run cost as follows—

(a)

where the delay is due to factors entirely attributable to the renewable energy

generator, the entire cost shall be borne by the renewable energy generator;

(b)

where the delay is due to force majeure, the Commission may allow the net

additional cost incurred on this account to the renewable energy generator: and

(c)

in a situation not covered under clauses (a) and (b), the Commission may allow the

additional cost, not exceeding 50% of the net additional cost incurred due to time

overrun:

Provided further that the renewable energy generator shall be deemed to have subscribed to

the requisite insurance policies covering the risks during construction stage and also to have

stipulated provisions for the liquidated damages in the contracts relating to the construction of the

project, awarded by him, as per the prudent practices, and accordingly, in case of any time and cost

over runs, the Commission shall not allow any amount which is or would have been recoverable by

him on account of such deemed provisions for Insurance and liquidated damages;

(ii)

the normative annual capacity utilisation factor specified under Chapter-V of these

Regulations for the SHPs or the annual capacity utilisation factor worked out on the

basis of data for 75% dependable year as per the approved Detailed Project Report,

whichever is higher;

(iii)

the technology specific parameters as specified for the SHPs in Chapter V of these

Regulations and as may be laid down by the Commission for the other renewable

Technologies as per regulation 17; and

(iv)

the ceiling norms, except for capital cost, as specified in Chapter-IV of these

Regulations:

Provided that if the licensee and renewable energy generator have, in accordance with

regulation 31 agreed to any improved norms, including operation and maintenance norms, which

may lead to overall reduction in the levellised tariff, such improved norms shall apply for

determination of the project specific levellised tariff; and

2455

jkti=] fgekpy izns'k] 27 tqykbZ] 2012@5 Jko.k] 1934

(2)

Where the project specific levellised tariff, as determined under sub-regulations

(1).—

(i)

exceeds 105% of the generic levellised tariff determined by the Commission for the

control period in which the Power Purchase Agreement was approved by the

Commission, the distribution licensee shall have the option to exit from the power

purchase agreement, provided that this option shall not be available to the

distribution licensee if the renewable energy renewable energy generator agrees to

keep the tariff within aforesaid limit;

(ii)

is less than 95% of the generic levellised tariff determined by the Commission for

the control period in which the Power Purchase Agreement was approved by the

Commission; the renewable energy generator shall have the option to exit from the

power purchase agreement, provided that this option shall not be available to the

renewable energy renewable energy generator if the distribution licensee agrees to

keep the tariff within aforesaid limit.

(3)

Where the exit option is exercised by the party under sub-regulation (2) and the

Interconnection Point for that project falls under the control of the distribution licensee, it shall, on

request from the renewable energy renewable energy generator, provide Open Access through its

system to the renewable energy renewable energy generator as per the Open Access regulations.

15.

Tariff for residual period after sale/purchase under REC mechanism.—(1) In

cases where, after sale/purchase of net saleable energy to/by the licensee as per the power purchase

agreement approved by the Commission under REC mechanism in the mutually agreed initial

period(s), the net saleable energy for the residual period of the useful life of the project is to be sold

to the distribution licensee under long term Power Purchase Agreements, the tariff for sale/purchase

of net saleable energy during such residual period shall, save as provided in sub regulations (2) and

(3), be regulated as under:—

(i)

If the first Power Purchase Agreement for sale/purchase of power under REC

mechanism from a SHP was executed by the parties and /or approved by the

Commission before the commencement of these Regulations—

(a)

where the capacity of the SHP does not exceed 5 MW, the tariff shall be

` 2.95 per kWh and such rate shall be subject to adjustment in accordance

with relevant orders of the Commission under which the rate of `2.95 per

kWh was determined under the HPERC (Power Procurement from

Renewable

Sources

and

Co-generation

by

distribution

Licensee)

Regulations, 2007;

(b)

where the capacity of the SHP is more than 5 MW, the Commission may

determine the project specific tariff taking into consideration the HPERC

(Power Procurement from Renewable Sources and Cogeneration by

Distribution Licensee) Regulations, 2007, including the order(s) issued by

the Commission thereunder in regard to tariff and other issues for SHPs upto

5 MW, and the free power (in percentage) applicable in case of that SHP:

Provided that the rate so determined shall be subject to a maximum limit of `2.90

per Kwh.

2456

jkti=] fgekpy izns'k] 27 tqykbZ] 2012@5 Jko.k] 1934

(ii)

if the first Power Purchase Agreement for sale/purchase of power to/by the licensee

under REC mechanism from a SHP is approved by the Commission on or after the

commencement of these Regulations and is signed thereafter, the generic levellised

tariff, as determined by the Commission for the relevant category of SHPs under

these Regulations, shall be applicable.

(2)

Save as provided in sub regulation (3), in cases where any specific conditions about

the rate/tariff applicable for the residual period referred to in sub regulation (1), have been

stipulated while approving the Power Purchase Agreement under REC mechanism, such conditions

shall be applicable.

(3)

If the circumstances so warrant, the Commission may on the merit of a case,

approve the rate/tariff prevailing in any of the earlier time frames prior to the commencement of

these Regulations, for sale/purchase of the net saleable energy during the residual period referred to

in sub-regulation (1).

16. Capacity enhancement.—(1) Where, after the allotment of the original project, the

capacity of a SHP is enhanced, with the approval of the State Government, the tariff for sale of net

saleable energy from such projects, shall be governed by the relevant provisions of sub-regulations

(2) to (7).

(2)

Where the Power Purchase Agreement has not been executed for the original

capacity, the enhanced capacity shall be taken into consideration while executing the Power

Purchase Agreement.

(3)

Where the Power Purchase Agreement has been approved or executed for the

original capacity prior to the commencement of these Regulations—

(i)

if the capacity of the project, after enhancement, does not exceed 5 MW, the tariff

applicable as per the Power Purchase Agreement for the original capacity shall be

applicable for the net saleable energy for the enhanced capacity subject to

adjustment in tariff on account of free power in accordance with sub-regulation (6);

(ii)

if the original capacity of the project was not more than 5 MW but the capacity, after

enhancement, exceeds 5 MW, the tariff applicable as per the Power Purchase

Agreement for the original capacity shall be reduced by 10% to account for the

expected reduction in the expenses on normative basis and shall then be adjusted to

account for the free power in accordance with sub-regulation (6) by taking into

account the free power (in percentage) factored in the tariff for the original capacity

as per the Power Purchase Agreement and free power (in percentage) to be allowed

in the tariff;

(iii)

if the original capacity of the project was more than 5 MW and the Power Purchase

Agreement spells out the rate applicable for sale of net saleable energy, the tariff

applicable as per the Power Purchase Agreement for the original capacity shall be

applicable for the net saleable energy for the enhanced capacity subject to

adjustment in tariff on account of free power in accordance with sub-regulation (6);

(iv)

if the original capacity of the project was more than 5 MW and the Power Purchase

Agreement does not spell out the rate applicable for sale of net saleable energy, the

Commission may, on joint application from the licensee and the renewable energy

generator, determine the project specific levellised tariff, after accounting for the

2457

jkti=] fgekpy izns'k] 27 tqykbZ] 2012@5 Jko.k] 1934

free power subject to maximum limits outlined in sub-regulation(3) of regulation 35,

by

duly

taking

into

account

the

Policy

of

the

State

Government/

Regulations/practices prevalent in the time, frame in which the Power Purchase

Agreement was executed for the original capacity, and such other factors/norms as it

may consider appropriate.

(4)

Where the Power Purchase Agreement for the original capacity of a small hydro

project covered in these Regulations is approved and executed after the commencement of these

Regulations, the generic levellised tariff as well as other associated terms and conditions applicable

for the relevant category of SHPs under which the enhanced capacity of the SHPs falls shall be

applicable for the entire capacity:

Provided that if such Power Purchase Agreement for the original capacity contains

provision for determination of project specific levellised tariff, the Commission may, on application

from both the parties, determine the project specific levellised tariff by taking into account the

norms applicable for the category of SHPs in which the enhanced capacity

of the project falls.

(5)

Where the Power Purchase Agreement has been executed for the original capacity

and the renewable energy generator sells energy, under the relevant Regulations governing REC

mechanism, to the distribution licensee from the additional capacity under REC mechanism with a

provision to sell such energy to the licensee for the balance part of the tariff period after exit from

the REC mechanism, the following provisions shall apply :—

(i)

the tariff for the entire net saleable energy for the residual part of the tariff period

shall be fixed/determined in accordance with sub regulation (3) or (4), as the case

may be;

(ii)

during the interim period when the energy is sold partly under the Power Purchase

Agreement for the original capacity and partly through the REC mechanism—

(a)

save as may have already been provided in the Power Purchase Agreement

for the original capacity, the tariff applicable for the original capacity shall

not be subject to any adjustment, on account of variation in free power,

under sub-regulation (6),

(b)

the total net saleable energy shall be apportioned in a firm ratio on the basis

of original capacity and the enhanced capacity.

(6)

In the cases covered by sub-regulations (3), (4) and clause (i) of sub-regulation (5),

the tariff shall be adjusted on account of variation in the free power (i.e. the free power to be

provided by the State Government from time to time vis-a-vis the free power already factored or

deemed to have been factored in the tariff as per Power Purchase Agreement) in accordance with

sub- regulations (2) and (3) of regulation 35.

(7)

Where the parties fail to arrive at an understanding for sale/purchase of energy in the

manner specified in sub-regulations (3) to (6), the right of the distribution licensee for the net

saleable energy as per the original Power Purchase Agreement, duly taking into account the data

contained in the Detailed Project Report for the original capacity and power generation on real time

basis shall remain protected and the renewable energy generator shall be eligible to dispose off only

the net incremental saleable energy (i.e. after duly adjusting the licensee’s first right as aforesaid

and the total quantum of free energy for the enhanced capacity of the Project) with the approval of

the Commission:

2458

jkti=] fgekpy izns'k] 27 tqykbZ] 2012@5 Jko.k] 1934

Provided that in such a case, the renewable energy generator shall also arrive at an

understanding with the distribution licensee about the modalities for energy accounting on real time

basis as well as on monthly and annual basis, with the approval of the Commission and based on

the same, the renewable energy generator shall also make the distribution licensee a party to any

such agreement for disposal of such incremental energy;

Provided further that in case the licensee and the renewable energy generator mutually

agree to purchase/sell the net incremental saleable energy at a specific rate and jointly make an

application to the Commission for determination of such rate, the Commission may determine the

specific levellised rate for such net incremental saleable energy as per the provisions of this sub-

regulation and by taking into account the provisions of the regulations/practices prevalent in the

time frame during which the capacity enhancement was permitted by the State Government.

17.

Tariff for renewable energy projects, other than small hydro projects.—(1) The

renewable energy projects, other than SHPs, may include the following:—

(i)

Wind power project;

(ii)

Biomass power project based on Rankine cycle technology;

(iii)

Non-fossil fuel based co-generation project;

(iv)

Biomass gasifier based power project;

(v)

Municipal Solid waste projects;

(vi)

Solar PV and solar thermal power projects,

(vii) Hybrid projects other than Hybrid solar thermal power plants including renewable–

renewable or renewable–conventional sources, for which renewable technology is

approved by the MNRE;

(viii) Biomass project other than that based on Rankine cycle technology application with

water cooled condenser;

(ix)

any other renewable energy technology which may be approved by the MNRE.

(2)

For the renewable energy technologies, other than SHPs, mentioned in sub-

regulation(1), the Commission may, by an order, determine generic levellised tariff(s) for any or all

categories of such renewable energy technology(ies) as and when and at such intervals, the

Commission feels the necessity to do so.

(3)

Where the generic levellised tariff has not been determined by the Commission for a

renewable energy technology under sub-regulation (2), the parties intending to enter into Power

Purchase Agreement may opt either for the project specific determination of tariff or for any

mutually agreed tariff with the approval of the Commission:

Provided that if the Commission, before actually determining the project specific tariff for

any such project, expresses its intention to determine the generic levellised tariff for that particular

technology in a relevant timeframe, the parties may mutually agree, with the approval of the

Commission, to follow the generic tariff to be determined by the Commission.

2459

jkti=] fgekpy izns'k] 27 tqykbZ] 2012@5 Jko.k] 1934

(4)

The determination of generic levellised or project specific tariff for sale of electricity

from such renewable energy sources shall be in accordance with such terms and conditions

(including the tariff period and useful life of the project in cases where it is not specified in these

regulation), as stipulated under the relevant orders of the Commission:

Provided that the Commission shall follow the technology specific parameters, as notified,

or as may be notified, from time to time by the Central Commission for the relevant technology as

ceiling parameters and may make such deviations (leading to overall reduction in tariff) as may be

considered appropriate by it while determining the generic or project specific tariff for any such

technology:

Provided further that the financial norms, except for capital cost, as specified under

Chapter-IV of these Regulations shall also be considered as ceiling norms.

(5)

In order to facilitate execution of the Power Purchase Agreements by the distribution

licensee with the renewable energy renewable energy generator, the Commission may, subject to

mutual agreement between the parties, allow, or otherwise direct, the parties to incorporate in the

Power Purchase Agreement—

(i)

a provisional tariff based on the generic levellised tariff, if any, notified by the

Central Commission for that technology(ies), for the relevant timeframe, or any

other rate as may be considered appropriate by the Commission;

(ii)

other related terms and conditions including the maximum permissible variations in

the provisional tariff;

(iii)

any deviations from financial norms as may be mutually agreed by the parties under

regulations 31 and 41; and

(iv)

any other conditions as may be considered appropriate by the Commission.

18.

Petition and proceedings for determination of project specific levellised

tariff.—(1) Where the renewable energy generator and the licensee have mutually agreed, in the

Power Purchase Agreement, for the determination of project specific levellised tariff, the renewable

energy generator shall file, ninety days before the expected date of commencement of operation of

the project, the petition for determination of the project specific levellised tariff in accordance with

the Conduct of Business Regulations which shall, apart from such fee as specified by the

Commission, be accompanied by—

(a)

a copy of the mutual agreement between the parties for project specific

determination of tariff and the conditions, if any;

(b)

the detailed breakup of capital expenditure incurred, tariff calculations etc. as per the

formats as may be laid down by the Commission from time to time;

(c)

the detailed project report outlining technical, operational data capacity utilisation

factor, site specific aspects, premise for capital cost and financing plan and, in case

of SHPs hydrological data for 75% dependable year;

(d)

a statement of all applicable terms and conditions and annual expenses as per these

Regulations;

2460

jkti=] fgekpy izns'k] 27 tqykbZ] 2012@5 Jko.k] 1934

(e)

a statement containing full details of calculation of any subsidy, incentives and grant

or budgetary support received, due or assumed to be due, from the Central

Government and/or State Government. This statement shall also include the

proposed tariff calculated with and without the benefit of accelerated depreciation in

accordance with regulation 21; and

(f)

electronic formats and soft copy of other details submitted;

(g)

requirements of additional data relevant to the agreement in pursuance of which the

project specific determination is sought;

(h)

any other information as the Commission may require the petitioner(s) to submit.

(2)

The Commission may, during the pendency of the petition filed under sub-regulation

(1), allow, on such terms and conditions as it may consider necessary, a provisional tariff not

exceeding the generic levellised tariff applicable to the relevant category.

19.

Review of tariff.—(1) Save as provided in sub-regulations (2) and (3), the generic

levellised tariff or project specific levellised tariff, as the case may be, determined in accordance

with the provisions of these Regulations shall be firm and shall not to subject to any review.

(2)

Impact of any change(s) in the rate of free power under the general policy for

allotment of sites, but only to the extent permitted under regulation 35 and further within the limit

of 13% as per the National Tariff Policy and/or National Hydro Policy, shall be payable/adjustable

as per the provisions of regulations 25 and 35.

(3)

If, after the determination of the generic levellised tariff for the control period or the

project specific levellised tariff for a project,—

(i)

a water cess or tax on generation is levied which impacts all or any of the projects;

and/or

(ii)

the limit of 13% for the pass through of free power in the tariff, as per the National

Hydro Policy/ Tariff Policy is revised, and/or

(iii)

the mechanism or quantum of the capital subsidy or budgetary grant mentioned in

regulation 21 is changed as a matter of policy and/or;

(iv)

the rate(s) of MAT or Corporate Tax, as adopted by the Commission for grossing up

the return on equity for the purpose of determination of levellised tariff in

accordance with regulation 25, undergo variation exceeding + 10% (to illustrate if

the rate is assumed as 30% and the actual rate is less than 20% or more than 40%) at

any stage during the tariff period;

the Commission may, suo motu or on an application made to it, by generic or specific order,

review the tariff for the residual tariff period or such other part as it may deem fit, for the projects

or group of projects actually impacted, to allow the impact of such changes as have not been taken

into account while determining the relevant tariff under these Regulations:

Provided that while revising the tariff, the Commission may incorporate such terms and

conditions, including the period for which such revised tariff shall be applicable, as it may deem fit.

2461

jkti=] fgekpy izns'k] 27 tqykbZ] 2012@5 Jko.k] 1934

CHAPTER-IV

FINANCIAL PRINCIPLES

20.

Capital Cost.—(1) The norms for the capital cost in case of SHPs shall be as

specified in Chapter-V of these Regulations and in case of other renewable technologies, shall be as

stipulated under relevant orders of the Commission under regulation 17.

(2)

The norms for the capital cost shall be inclusive of all the expenses required to be

incurred as per prudent practices upto the commissioning of the project, including, but not limited

to, the cost of capital works, land, preparation of Detailed Project Report, Survey and Investigation,

plant and machinery, civil works, erection and commissioning, financing and interest during

construction, land acquisition, resettlement and rehabilitation, statutory and non-statutory

clearances and evacuation infrastructure up to inter-connection point (also including

interconnection facilities), insurance charges against the risks during construction stage etc. and

also all taxes, levies and duties on all such components/works capital works:

Provided that any cost pertaining to allotment of the project, including upfront premium and

any other amount charged by the State Government while granting extension or capacity

enhancement or/and any liquidated damages/penality imposed in accordance with the Power

Purchase Agreement executed with the licensee, will not form part of the capital cost:

Provided further that for project specific tariff determination, the renewable energy

generator shall submit the item wise break-up of capital cost along with its petition in the manner

specified under regulation 18 and the capital cost admitted by the Commission shall be taken into

consideration.

21.

Subsidy or incentive or grant/budgetary support by the Central/State

Government.—(1) While determining the generic levellised or project specific levellised tariff, as

the case may be, for the renewable energy project(s) under these Regulations, the Commission shall

take into consideration any incentive and/or subsidy and/or grant available under the schemes of the

Central or State Government or its agencies, including accelerated depreciation benefit under the

Income Tax Act:

Provided that for tariff determination, 90% of the capital subsidy available to the project as

per applicable scheme of the MNRE/ State Government shall be considered:

Provided further that for the determination of generic levellised tariff for a category of

projects, the Commission may consider such value(s) of the subsidy available for that category of

projects, as it may deem fit:

Provided further that the capital subsidy under the schemes of the Central or State

Government or its agencies, shall, unless the circumstances otherwise warrant, be ordinarily

adjusted against the principal component of the loan amount as additional reduction apart from

the normal payment:

Provided further that where the Central Government or the State Government has notified

or notifies any generation based incentive (GBI) scheme for a particular kind of renewable

technology, such technology based generating station shall be assumed to have availed the benefit

of such a scheme and their tariffs shall automatically be treated as reduced by the amount of

generation based incentive (GBI) per unit for the period during which such incentive remains

applicable.

2462

jkti=] fgekpy izns'k] 27 tqykbZ] 2012@5 Jko.k] 1934

(2)

Where any additional grant or budgetary support is available to any project, apart

from the incentive and/or subsidy and/or grant available under sub-regulation (1) of this regulation,

the Commission shall account for 100% of such budgetary support, while determining project

specific levellised tariff.

(3)

The amount of subsidy shall be considered for each renewable source as per the

applicable policy of the MNRE/State Government and if the amount and/or mechanism of subsidy

is changed by the MNRE/State Government, then necessary corrections in tariffs may be carried

out by the Commission in accordance with regulation 19.

(4)

The Commission shall determine two generic levellised tariffs or project specific

levellised tariffs, as the case may be, one by considering accelerated depreciation and the other

without it, and the tariff to any renewable energy generator shall be applicable as provided in

succeeding sub-regulation(5):

Provided that for ascertaining income tax benefits on account of accelerated depreciation,

for the purpose of tariff determination—

(a)

assessment of benefit shall be based on normative capital cost or the cost admitted,

as the case may be, accelerated depreciation rate, as per relevant provisions under

the Income Tax Act and the Corporate Tax rate;

(b)

in case of generic levellised tariff, capitalisation of renewable energy projects shall

be considered during second half of the financial year and in case of project specific

levellised tariff, the expected date of commencement of operation of the project

shall be considered;

(c)

per unit benefit shall be derived on levellised basis at the discount factor equivalent

to the post tax weighted average cost of capital.

(5)

It shall be assumed that the renewable energy renewable energy generator shall avail

the benefit of accelerated depreciation and accordingly the tariff, which accounts for

the accelerated depreciation, shall be applicable unless the renewable energy

generator establishes, to the satisfaction of the distribution licensee, that he has not

availed or is not entitled to such a benefit.

22.

Debt-Equity Ratio.—(1) The normative debt equity ratio shall be 70:30.

(2)

For generic levellised tariff, the Commission shall adopt debt equity ratio of 70:30.

(3)

For project specific levellised tariff, the following provisions shall apply—

(i)

if the equity actually deployed is more than 30% of the capital cost admitted by the

Commission under regulation 14, the equity deployed in excess of 30% limit shall

be treated as normative loan in accordance with the National Tariff Policy and shall

be deemed as advanced at the weighted average rate of interest and for a weighted

average tenor of the long term debt component of the project after ascertaining the

reasonableness of the interest rates and taking into account the effect of debt

restructuring, if any;

(ii)

in case the equity deployed is equal to or below the normative level of 30%, the

actual equity would be used for determination of Return on Equity in tariff

computations.

2463

jkti=] fgekpy izns'k] 27 tqykbZ] 2012@5 Jko.k] 1934

(iii)

the equity invested in foreign currency, if any, shall be designated in Indian rupees

on the date of each investment.

Explanation.—For the purposes of return on equity, any resources available to the

renewable energy generator from its share premium account or from its internal resources that are

used to fund the equity commitments of the project under consideration shall be treated as equity

subject to the limitations contained in this regulation and regulation 25.

(4)

The Commission shall treat any incentive or subsidy and/or grant/budgetary support

available from the MNRE/State Government, to the extent specified under regulation 21, to have

been utilized towards prepayment of debt in such phases as it may deem fit, leaving balance loan to

be considered for determination of tariff.

23.

Loan and Finance Charges.—(1) For the purpose of determination of tariff, loan

tenure of 12 years, inclusive of moratorium period if any, shall be considered:

Provided that the capital subsidy admissible the renewable energy renewable energy

generator shall normally be considered for the reduction of loan period and such reduced loan

tenure shall be considered for the purpose of tariff determination.

(2)

Interest Rate—

(a)

The loan arrived at in the manner indicated in regulation 22 shall be

considered as gross normative loan for calculation for interest on loan. The

normative loan outstanding as on April 1st of every financial year shall be

worked out by deducting the cumulative repayment, inclusive of the

prepayment, upto March 31st of the previous financial year from the gross

normative loan on normative basis.

(b)

For the purpose of computation of tariff, the Average of State Bank of India

Base rate(s) prevalent during a period of 6 months preceding the date of

commencement of these Regulations, plus 300 basis points shall be

considered as the normative interest rate.

(c)

Notwithstanding any moratorium period availed by the renewable energy

renewable energy generator, the repayment of loan shall be considered from

the first year of the tariff period and shall be equal to the annual depreciation

allowed.

(d)

The loan repayment for a financial year or the relevant part period thereof

shall be considered to have been done in the middle of that financial year or

the relevant part period thereof, as the case may be.

24.

Depreciation.—For the purpose of tariff determination, depreciation shall be

computed in the following manner, namely:—

(a)

the value base for the purpose of depreciation shall be the normative capital cost (for

generic tariff) or the capital cost of the project as admitted by the Commission (for

project specific tariff), as the case may be;

(b)

the salvage value of the asset shall be considered as 10% and depreciation shall be

allowed up to maximum of 90% of the capital cost of the asset;

2464

jkti=] fgekpy izns'k] 27 tqykbZ] 2012@5 Jko.k] 1934

(c)

depreciation per annum shall be based on ‘Differential Depreciation Approach’. For

tariff purposes, the depreciation shall be allowed @ 5.83 % per annum till such time

the requirement for repayment of loan component of the capital cost as per

regulations 20 and 22, after adjusting the amount of subsidy as per regulation 21, is

fully provided and the remaining depreciation shall be spread over the residual

useful life of the project on straight line method;

(d)

depreciation shall be chargeable from the first year of commencement of operation

of the project:

Provided that in case of operation of the asset for part of the year, depreciation shall be

charged on pro rata basis for the purposes of project specific determination of tariff.

25.

Return on Equity.—(1) The value base for the equity shall be 30% of the

normative capital cost as determined under regulation 20:

Provided that in case of project specific determination, the value base of equity shall be

restricted to the actual amount of equity or 30% of the capital cost admitted by the Commission,

whichever is lower, in accordance with the provisions of regulation 22.

(2)

The return on equity shall be computed on the pre tax basis at the base rate of 14%

to be grossed up with the normal tax rate for each year i.e.14%/[1-(Tax rate(%)/100)].

(3)

For the purpose of grossing up the return on equity for determination of levellised

tariff for the tariff period, the Commission shall consider such rates of MAT and Corporate Tax,

along with corresponding periods for their applicability, as it may deem fit after duly taking into

account the rates and other relevant provisions applicable/announced by the Central Government at

the time of determination of tariff in respect of these taxes.

(4)

If the rates of MAT or Corporate Tax considered by the Commission as per sub-

regulation(3) for the determination of levellised tariff undergo variation exceeding + 10% (to

illustrate if the rate is assumed as 30% and the actual rate is less than 20% or more than 40%) at

any stage during the tariff period, the Commission may, either on an application from any affected

party or suo-moto, by general or special order, review the levellised tariff for the residual tariff

period in accordance with regulation 19 subject to such terms and conditions and other stipulations,

as the Commission may deem fit.

26.

Interest on working capital (1) The working capital requirement in respect of

wind energy projects, small hydro power, solar PV and solar thermal projects shall be computed in

accordance with the following:—

(a)

operation and maintenance expenses for one month;

(b)

receivables equivalent to 2 (two) months of energy charges for sale of electricity

calculated on the net saleable energy corresponding to the CUF considered for tariff

determination on normative basis;

(c)

maintenance spare @ 15% of operation and maintenance expenses.

(2)

The working capital in respect of biomas power and non-fossil fuel based

cogeneration projects shall be computed in accordance with the following.—

2465

jkti=] fgekpy izns'k] 27 tqykbZ] 2012@5 Jko.k] 1934

(a)

fuel cost for four months equivalent to normative PLF.

(b)

operation and maintenance expenses for one month;

(c)

receivables equivalent to 2 (two) months of energy charges for sale of electricity

calculated on the net saleable design energy on normative basis;

(d)

maintenance spare @ 15% of operation and maintenance expenses.

(3)

In case of the renewable technologies not covered in subregulations (1) and (2), the

Commission may adopt such norms, as it may consider appropriate, at the time of determination of

tariff.

(4)

Interest on working capital shall be the interest rate equivalent to average of SBI

Base Rate (s) prevalent during the period of 6 months preceding the date of commencement of

these Regulations, plus 350 basis points.

27.

Operation and maintenance expenses.—(1) Operation and maintenance expenses

means the expenditure incurred on operation and maintenance of the project, or part thereof, and

includes, without limitation, the expenditure on manpower, establishment (including employees

expense, administrative and general expenses), repairs, spares, consumables, insurance and

overheads as well as the taxes, duties and other levies on any or all such activities.

(2)

Operation and maintenance expenses shall be determined for the tariff period based

on normative operation and maintenance expenses specified in Chapter-V of these Regulations for

the SHPs and as stipulated in relevant orders of the Commission for other renewable technologies.

(3)

Normative O&M expenses allowed under these Regulations shall be escalated at the

rate of 5.72% per annum over the tariff period.

28.

Taxes and duties.- Tariff determined under these Regulations shall be inclusive of

all taxes and duties and shall not be subject to any change except for the provisions specified under

regulation 19.

29.

Rebate.—(1) The due date for payment of bills shall be 60 days from the date of

billing.

(2)

For payment of bills of the renewable energy generator through letter of credit, a

rebate of 2% shall be allowed.

(3)

Where payments are made other than through letter of credit within a period of one

month of presentation of bills by the renewable energy generator, a rebate of 1% shall be allowed.

30.

Late payment surcharge.—In case the payment of any bill for charges payable

under these Regulations is delayed beyond a period of 60 days from the date of billing, a late

payment surcharge at the simple interest rate of 1.25% per month shall be levied by the renewable

energy generator for the actual number of days by which the payment is delayed.

31.

Ceiling norms.—The financial norms, except for capital cost, as specified in this

Chapter of these Regulations, shall be considered as ceiling norms and the same shall not preclude

the licensee or renewable energy renewable energy generator from agreeing to the improved norms,

including operation and maintenance norms, which may lead to overall reduction in the levellised

tariff and in case the improved norms are agreed to, such improved norms shall be applicable for

determination of the project specific levellised tariff.

2466

jkti=] fgekpy izns'k] 27 tqykbZ] 2012@5 Jko.k] 1934

CHAPTER–V

TECHNOLOGY SPECIFIC PARAMETERS FOR SMALL HYDRO

PROJECTS

32.

Categorisation.—For the purpose of tariff determination, the SHPs shall be

categorised as under:—

(i)

Above 100 kW to 2 MW capacity

(ii)

Above 2 MW to 5 MW capacity

(iii)

Above 5 MW to 25 MW capacity

33.

Capital cost.—(1) In case of SHPs, the normative capital cost inclusive of all its

components as specified in regulation 20 of these regulations, for the control period shall be as

under:—

S.No.

Category of small hydro project

` in Lac per MW)

(i)

Above 100 kW to 2 MW capacity

780

(ii)

Above 2 MW to 5 MW capacity

750

(iii)

Above 5 MW to 25 MW capacity

700

(2)

The subsidy/grant/budgetary support or incentives provided by the Central/State

Government shall be adjusted in accordance with the regulation 21 of these Regulations.

34.

Normative saleable energy.—(1) The normative saleable energy at the

interconnection point for the purpose of generic levellised tariff shall be computed on the following

lines namely :—

(i)

The normative annual capacity utilisation factor (CUF) for all the SHPs upto 25

MW shall be 55%.

(ii)

The normative annual energy worked out at the normative CUF under preceding

clause (i) for the installed capacity shall be adjusted for the auxiliary consumption,

transformation losses and the losses on the project line(s) at the normative rates as

per regulations 36 and 37.

(iii)

The energy worked out under preceding clause (ii) shall be further reduced by the

permissible rate of the free power subject to a maximum of 13%, for any year or part

thereof, consistent with the National Hydro Policy, Tariff Policy and the policy of

the State Government for allotment of sites of SHPs in the manner as laid down in

regulation 35, so as to arrive at the yearwise normative net saleable energy at the

interconnection point which shall be taken into account for working out the generic

levellised tariff.

(2)

The normative capacity utilization factor (CUF) under clause (i) of sub-regulation(1)

takes into account the impact of mandatory release of water discharge immediately downstream of

diversion structure of the project and any change(s) in such mandatory release of water discharge

shall not be considered for the review of tariff.

2467

jkti=] fgekpy izns'k] 27 tqykbZ] 2012@5 Jko.k] 1934

(3)

The normative yearwise net saleable energy for the purpose of project specific tariff

determination shall also be worked out on similar lines given in sub-regulations (1) and (2) but by

taking into account the Annual Capacity Utilisation Factor (CUF) in accordance with clause (ii) of

sub-regulation (1) of regulation 14, the normative auxiliary consumption and transformation losses

under regulation 36 and the energy losses on the project line under regulation 37.

35.

Free Power.—(1) The Commission shall consider appropriate structure(s) of free

power for determination of generic levellised tariffs for various categories of SHPs, as mentioned

in Regulation 32, duly keeping in view of the provisions of the State Hydro Policy for allotment of

sites for SHPs, National Hydro Policy, Tariff Policy and the limits specified under sub-regulation

(3):

Provided that in cases requiring determination of the project specific tariff, the Commission

shall consider the structure of free power actually applicable to that project subject to the above and

the limits specified in sub-regulation(3).

(2)

In case of any change in the structure of free power from that considered for the

determination of generic levellised tariff or project specific levellised tariff in accordance with sub-

regulation (1) or in cases where the adjustment in tariff on account of variation in free power has to

be allowed as per the specific provisions contained in these Regulations, including those covered in

regulation 16, the tariff shall be adjusted, if permissible under sub-regulation (2) of regulation 19,

as per the following formula:—

Rate payable

for the month

for the net

= a X (100- b)

saleable

(100-c)

Energy

(Rs/kWh)

Where,—

“a” is the levellised tariff (in Rs/kWh) which is required to be adjusted under this regulation

“b” is the free power (in percentage) taken into account or deemed as taken into account for

the month, in “a”

“c” is the free power (in percentage) to be allowed in the tariff for the month subject to

maximum limit of 13% free power (energy) and the provisions of sub- regulation (3)

Where free power is applicable at different rates for different parts of a month, the

permissible free power (i.e. “c”) shall be determined under this sub-regulation separately for each

such part and weighted average rate for the month as a whole shall be worked out by considering

the total quantum of energy for each day of the month.

(3)

The free power (in percentage) to be taken into consideration for the purpose of

determination of tariff under sub-regulation (1) and/or any review(s) under sub-regulation (2) shall

be subject to the following:

(i)

The free energy to be taken into account for any part of the tariff period for the

purposes of sub-regulation (1), or to be allowed for any part of the tariff period for

the purposes of sub-regulation (2), shall not exceed 13% free power(energy) which

includes 12% free power to home State and 1% additional free power for Local Area

Development Fund, as stipulated in the National Hydro Policy/Tariff Policy.

2468

jkti=] fgekpy izns'k] 27 tqykbZ] 2012@5 Jko.k] 1934

(ii)

Any quantum of free energy, if committed by the renewable energy renewable

energy generator over and above the 13% free power (energy) for any period shall

not be factored into the tariff.

(iii)

Additional free energy, if any, to be provided by the renewable energy generator to

the State Government, on account of curtailment of waiver period due to delay in

commissioning of project as per provisions of Implementation Agreement and/or

capacity addition charges on account of enhancement of capacity and/or any reason

attributed to the renewable energy generator shall not be taken into account even if

the total free power for any period, including such additional free power, does not

exceed 13% free power (energy).

(iv)

The quantification and adjustment of free energy as well the energy accounting shall

be made with reference to the energy projected/received at the interconnection point.

(v)

The free energy to be allowed for any period for the purpose of sub-regulation (2)

shall in no case be more than that actually provided.

36.

Auxiliary consumption and transformation losses.—Normative auxiliary

consumption and transformation losses for the SHPs shall be 0.5% of the gross generation and the

same for transformation losses at the switchyard linked to the generating station of the projects

shall also be 0.5%.

Provided that for the sake of simplicity, these two factors shall be clubbed together and

accounted for as 1% of the gross generation.

37.

Energy losses.—(1) The normative energy losses in the project line(s) shall be 0.7%

of the net generation i.e. after deducting auxiliary consumption and transformation losses, on

normative basis, from the gross generation (2) For the project specific levellised tariff, the

percentage losses worked out on the basis of actual length of the project line(s), conductor size and

expected power flow shall be taken into consideration.

38.

Operation and maintenance expenses.—(1) Normative annual O&M expenses for

the control period shall be as follows:—

Sl. No.

Category of Project

Annual O&M expenses

` in Lac per MW

(i)

Above 100 kW to 2 MW capacity

25

(ii)

Above 2 MW to 5 MW capacity

22

(iii)

Above 5 MW to 25 MW capacity

18

CHAPTERV-VI

OTHER PARAMETERS

39.

CDM benefits.—The proceeds of carbon credit from approved CDM project shall

be shared between the renewable energy generator and the licensee as under—

(a)

100% of the gross proceeds on account of CDM benefit for the first 365 days from

the date of commencement of operation of the project shall be retained by the

renewable energy generator;

2469

jkti=] fgekpy izns'k] 27 tqykbZ] 2012@5 Jko.k] 1934

(b)

the share of the licensee in the gross proceeds of CDM benefit shall be progressively

increased by 10% of such gross proceeds for every subsequent period of 365 days

till the share of licensee reaches a level of 50% of the gross proceeds of CDM

benefits (i.e. in 5 such periods) and thereafter the proceeds shall be shared in equal

proportion, by the renewable energy generator and the licensee;

(c)

the CDM benefits shall not be considered for determination of generic or project

specific levellised tariff and total amount of licensee’s share shall be remitted

directly by the renewable energy generator to the distribution licensee for each

financial year within one month of its receipt alongwith auditor’s certification in

accordance with provisions of this regulation and in the event of failure of the

renewable energy generator to remit the proceeds, the licensee shall deduct the same

from the dues of the renewable energy generator.

Provided that the renewable energy generator shall submit the information on half yearly

basis to the licensee regarding the proceeds received on this account.

40.

Tariff for lower or higher generation.—The tariff based on normative quantum of

net saleable energy corresponding to the normative CUF, or any other higher CUF taken into

consideration for the project specific determination of tariff as per the provisions of regulation 14,

as the case may be, shall be applicable for the entire quantum of net saleable energy actually

achieved irrespective of whether such quantum is higher or lesser than the normative quantum of

net saleable energy taken into consideration for determination of the tariff.

CHAPTER-VII

MISCELLANEOUS

41.

Deviation from norms.—Tariff for sale of electricity by the renewable energy

generator may also be agreed between the renewable energy generator and the licensee in deviation

from the norms specified in these regulations subject to the condition that the levellised tariff over

the useful life of the project on the basis of the norms in deviation does not exceed the levellised

tariff determined on the basis of the norms specified in these Regulations:

Provided that the reasons for deviation from the norms specified under these Regulations

shall be recorded in writing.

42.

Overriding effect.—The provisions of these Regulations shall have effect

notwithstanding anything inconsistent therewith contained in any other regulations, framed by the

Commission, relating to the determination of tariff and/or making provisions for open access under

the Act.

43.

Power to remove difficulties.—If any difficulty arises in giving effect to these

Regulations, the Commission may, of its own motion or otherwise, by an order, and after giving a

reasonable opportunity to those likely to be affected by such order, make such provisions, not

inconsistent with these Regulations, as may appear to be necessary for removing the difficulty.

44.

Power to relax.—The Commission may, by general or special order, for reasons to

be recorded in writing and after giving an opportunity of hearing to the parties likely to be affected,

may relax any of the provisions of these Regulations on its own motion or on an application made

before it by an interested person.

2470

jkti=] fgekpy izns'k] 27 tqykbZ] 2012@5 Jko.k] 1934

45.

Repeal and savings.—(1) Save as otherwise provided in these Regulations, the

Himachal Pradesh Electricity Regulatory Commission (Power Procurement from Renewable

Sources and Co-generation by Distribution Licensee) Regulations, 2007 shall stand repealed from

the commencement of these Regulations.

(2)

Notwithstanding anything contained in sub-regulation (1) the Himachal Pradesh

Electricity Regulatory Commission (Power Procurement from Renewable Sources and

Cogeneration by Distribution Licensee), Regulation, 2007, shall continue to be in force in such

cases as are covered under the said regulations and do not fall within the scope of these

Regulations.

By Order of the Commission,

Sd/-

Secretary.

___________

fuokZpu foHkkx

“kqf)i=

f”keyk&171009] 26 tqykbZ] 2012

Lka[;k 3&15@2012&bZ-,y-,u-&&bl foHkkx dh vf/klwpuk lela[;kad fnukad 23 tqykbZ] 2012

ftldks fgekpy izns”k jkti= esa fnukad 23 tqykbZ] 2012 dh vf/klwpuk la[;k% 88&jkti=@

2012&23&7&2012¼2377½ }kjk izdkf”kr fd;k x;k Fkk esa fuokZpu yM+us okys vH;fFkZ;ksa dh lwph esa Øe

la[;k 1 o 2 ds lEeq[k *vH;FkhZ dk uke* LrEHk esa *Jh* “kCn dk yksi fd;k tkuk gS ftls tulk/kkj.k dh

lwpuk gsrq izdkf”kr fd;k tkrk gSA

vkns”k ls]

ujsUnz pkSgku]

Ekq[; fuokZpu vf/kdkjhA

&&&&&&&

2471

jkti=] fgekpy izns'k] 27 tqykbZ] 2012@5 Jko.k] 1934

HIGHER EDUCATION DEPARTMENT

NOTIFICATION

Shimla-2, the 20th July, 2012

No. EDN-A-Ka(1)-2/2012-II.—The Governor, Himachal Pradesh is pleased to order the

creation of teaching and non-teaching posts for Government College, Kotla-Behar, Tehsil Jaswan,

Distt. Kangra, H.P. as under:—

Sl.

No.

Category

Scale

No. of

Post(s)

Mode of filling up

1.

Principal

` 12000-15100 (Pre-revised)

01

On Regular basis

2.

Lecturer (English)

`15600-39100+GP6000 (For

regular appointee)

`15600+6000=21600/PM

(For contract appointee)

01

On contract basis

3.

Lecturer (Hindi)

-do-

01

-do-

4.

Lecturer (Pol. Science)

-do-

01

-do-

5.

Lecturer (Sociology)

-do-

01

-do-

6.

Lecturer (History)

-do-

01

-do-

7.

Supdt. Gr.-II

` 6400-10640/-(Pre-revised)

01

On secondment

basis

8.

Librarian

`15600-39100+AGP6000)

(For regular incumbents)

` 21600/-PM (For contract

employees)

01

On contract basis

9.

Clerk

` 3120-6200/- (Pre-revised)

01

-do-

10.

Peon

` 2520-4140/- (Pre-revised)

02

From FD’s Surplus

Pool

11.

Chowkidar

` 2520-4140/- (Pre-revised)

01

-do-

12.

Sweeper

` 2520-4140/- (Pre-revised)

01

Through

outsourcing

Total

13

The expenditure will be incurred under major Head 2202-03-103-01 SOON-Non-Plan for

smooth functioning of the colleges.

This issues with the prior concurrence of the Finance Department obtained vide their U.O.

No. 5224870-Fin-E dated 26-6-2012.

By order,

Sd/-

Secretary (Education).

____________

HIGH COURT OF HIMACHAL PRADESH AT SHIMLA-171001

NOTIFICATION

Shimla, the 19th July, 2012

No.HHC/ADmn.6(23)/74-XIV.—Hon’ble the Chief Justice in exercise of the power vested

in him under Rule 2 (32) of Chapter 1 of H.P. Financial Rules, 2009 has been pleased to declare the

Civil Judge (Junior Division)-cum-JMIC, Court No. 4, Mandi, as Drawing and Disbursing Officer

2472

jkti=] fgekpy izns'k] 27 tqykbZ] 2012@5 Jko.k] 1934

in respect of the Court of Civil Judge (Senior Division)-cum-JMIC, Court No. I, Mandi and also the

Controlling Officer for the purpose of T.A. etc. in respect of the establishments attached to the

aforesaid Courts under head “2014 Administration of Justice” during the leave period of Smt.

Praveen Chauhan or until he returns from leave.

By order,

Sd/-

Registrar General.

___________

HIGH COURT OF HIMACHAL PRADESH, SHIMLA-171 001

NOTIFICATION

Shimla, the 21st July, 2012

No.HHC/Admn.16 (22)75-IV.—Hon’ble the Chief Justice, in exercise of the powers

vested in him U/S 139(b) of the Code of Civil Procedure, 1908, U/S 297(b) of the Code of Criminal

Procedure, 1973 and Rule 5 (vi) of the H.P. Oath Commissioners (Appointment & Control) Rules,

2007 has been pleased to appoint Sh. Durga Ram Sharma, Advocate, Sangrah as Oath

Commissioner at Sangrah, H.P. for a period of two years, with immediate effect, for administering

oaths and affirmations on affidavits to the deponents, under the aforesaid Codes and Rules.

By order,

Sd/-

Registrar General.

__________

HIGH COURT OF HIMACHAL PRADESH AT SHIMLA-171001

NOTIFICATION

Shimla, the 19th July, 2012

No.HHC/Admn.6(23)/74-XIV Hon’ble the Chief Justice in exercise of the power vested in

him under Rule 2 (32) of Chapter 1 of H.P. Financial Rules, 2009 has been pleased to declare the

Civil Judge (Junior Division)-cum-JMIC, Court No. IV, Mandi, as Drawing and Disbursing Officer

in respect of the Court of Civil Judge (Senior Division)-cum-JMIC, Court No. II, Mandi and also

the Controlling Officer for the purpose of T.A. etc. in respect of the establishments attached to the

aforesaid Courts under head “2014 Administration of Justice” during the leave period of Shri

Rajesh Chauhan or until he returns from leave.

By order,

Sd/-

Registrar General.

_________

HIGH COURT OF HIMACHAL PRADESH, SHIMLA-171 001

NOTIFICATION

Shimla, the 21st, 2012

No.HHC/Admn.16 (20)75-II.—Hon’ble the Chief Justice, in exercise of the powers vested

in him U/S 139(b) of the Code of Civil Procedure, 1908, U/S 297(b) of the Code of Criminal

Procedure, 1973 and Rule 5 (vi) of the H.P. Oath Commissioners (Appointment & Control) Rules,

2007 has been pleased to appoint Sh. Manoj Thakur, Ms. Simple Sharma and Sh. Vishal Raghu,

Advocates, Bilaspur as Oath Commissioners at Bilaspur, for a period of two years, with immediate

2473

jkti=] fgekpy izns'k] 27 tqykbZ] 2012@5 Jko.k] 1934

effect, for administering oaths and affirmations on affidavits to the deponents, under the aforesaid

Codes and Rules.

By order,

Sd/-

Registrar General.

___________

HIGH COURT OF HIMACHAL PRADESH AT SHIMLA

NOTIFICATION

Shimla, the 19th July, 2012

No. HHC/GAZ/14-260/2003.—Hon’ble the Chief Justice has been pleased to grant 10

days’ earned leave w.e.f. 31-7-2012 to 9-8-2012 with permission to suffix gazetted holiday, Second

Saturday and Sunday falling on 10th, 11th and 12th August, 2012 in favour of Shri Rajesh

Chauhan, Civil Judge (Senior Division)-cum- JMIC, Court No. II, Mandi, H.P.

Certified that Shri Rajesh Chauhan is likely to join the same post and at the same station

from where he proceeds on leave, after expiry of the above period of leave.

Also certified that Shri Rajesh Chauhan would have continued to hold the post of Civil

Judge (Senior Division)-cum-JMIC, Court No.II, Mandi, but for his proceeding on leave for the

above period.

By order,

Sd/-

Registrar General.

____________

HIGH COURT OF HIMACHAL PRADESH AT SHIMLA

NOTIFICATION

Shimla, the 19th July, 2012

No. HHC/GAZ/14-261/2003.—Hon’ble the Chief Justice has been pleased to grant 10

days’ earned leave w.e.f. 31-7-2012 to 9-8-2012 with permission to suffix gazetted holiday, Second

Saturday and Sunday falling on 10th, 11th and 12th August, 2012 in favour of Smt. Praveen

Chauhan, Civil Judge (Senior Division)-cum-JMIC, Court No. I, Mandi, H.P.

Certified that Smt.Praveen Chauhan is likely to join the same post and at the same station

from where she proceeds on leave, after expiry of the above period of leave.

Also certified that Smt. Praveen Chauhan would have continued to hold the post of Civil

Judge (Senior Division)-cum-JMIC, Court No. I, Mandi, but for her proceeding on leave for the

above period.

By order,

Sd/-

Registrar General.

2474

jkti=] fgekpy izns'k] 27 tqykbZ] 2012@5 Jko.k] 1934

HIGH COURT OF HIMACHAL PRADESH, SHIMLA-171001

NOTIFICATION

Shimla, 20th July, 2012

No.HHC/Admn.3 (126)/79-I.—14 days commuted leave on and with effect from 28-06-2012 to

11-07-2012 is hereby sanctioned ex-post-facto, in favour of Shri J.D. Bhardwaj, Deputy Registrar

of this Registry.

Certified that Shri J.D. Bhardwaj has joined the same post and at the same station from

where he had proceeded on leave after the expiry of the above leave period.

Certified that Shri J.D. Bhardwaj would have continued to officiate the same post of Deputy

Registrar, but for his proceeding on leave.

By order,

Sd/-

Registrar General.

_________

HIGH COURT OF HIMACHAL PRADESH, SHIMLA-171001

NOTIFICATION

Shimla, the 20th July, 2012

No.HHC/Admn.3 (145)/80-I.—20 days commuted leave on and with effect from

27-06-2012 to 16-07-2012 is hereby sanctioned ex-post-facto, in favour of Shri Roop Singh

Thakur, Assistant Registrar of this Registry.

Certified that Shri Roop Singh Thakur has joined the same post and at the same station from

where he had proceeded on leave after the expiry of the above leave period.

Certified that Shri Roop Singh Thakur would have continued to officiate the same post of

Assistant Registrar, but for his proceeding on leave.

By order,

Sd/-

Registrar General.

fu;U=d] eqnz.k rFkk ys[ku lkexzh] fgekpy izns'k] f'keyk&5 }kjk eqfnzr rFkk izdkf'kr