jkti=] fgekpy izns'k

fgekpy izns'k jkT; 'kklu }kjk izdkf'kr

f”keyk] lkseokj] 4 uoEcj] 2013@13 dkfrZd] 1935

fgekpy izns'k ljdkj

HIMACHAL PRADESH ELECTRICITY REGULATORY COMMISSION

SHIMLA

NOTIFICATION

Shimla, the 1st November, 2013

No.

HPERC/F(5)(3)(1)(Retail).—WHEREAS

the

Himachal

Pradesh

Electricity

Regulatory Commission has framed the HPERC (Terms and Conditions for Determination of

Wheeling Tariff and Retail Supply Tariff) Regulations, 2011;

168&jkti=@2013&4&11&2013 ¼4579½

4580

jkti=] fgekpy izns'k] 4 uoEcj] 2013@13 dkfrZd 1935

AND WHEREAS the Himachal Pradesh Electricity Regulatory Commission is making an

exercise to determine the tariff for distribution licensee for the next control period starting from 1st

April, 2014;

NOW, THEREFORE, in exercise of the powers conferred by clauses (zd), (ze) and (zf) of

sub-section (2) of section 181, read with sections 61, 62 and 86, of the Electricity Act, 2003 (36 of

2003) and all other powers enabling it in this behalf, and after previous publication, the Himachal

Pradesh Electricity Regulatory Commission makes the following amendments to the HPERC

(Terms and Conditions for Determination of Wheeling Tariff and Retail Supply Tariff)

Regulations, 2011, published in the Rajpatra, Himachal Pradesh, dated 2nd April, 2011, namely:-

REGULATIONS

Short title and commencement.—(1) These regulations shall be called the Himachal

Pradesh Electricity Regulatory Commission (Terms and Conditions for Determination of Wheeling

Tariff and Retail Supply Tariff) (Second Amendment) Regulations, 2013.

(2) These amendment regulations shall come into force from the date of their publication

in the Rajpatra, Himachal Pradesh, and shall be applicable for the tariff orders to be issued for the

control periods commencing with effect from 1st April, 2014 and thereafter.

1. Amendment of regulation 2.—In regulation 2 of the Himachal Pradesh Electricity

Regulatory Commission (Terms and Conditions for Determination of Wheeling Tariff and Retail

Supply Tariff) Regulations, 2011 (hereinafter called the “said regulations”), after clause (16), the

following clause (16-a) shall be inserted, namely:-

“(16-a) “performance review” means the review of performance of the distribution

licensee undertaken by the Commission annually for the 2nd and successive years of the control

period and this shall include the mid-term performance review carried out for the year after the

mid-year of the control period, the annual performance reviews carried out for the years other than

the first year, the true-up of the previous control period and true-up of previous years of the control

period;”

2. Amendment of regulation 4 – In regulation 4 of the said regulations –

(a) after clause (c), the following clause (cc) shall be inserted, namely:-

“(cc) Uncontrollable parameters shall include power purchase and power sale by

the distribution licensee;”

(b) for clause (d), the following clauses (d) and (dd) shall be substituted, namely:-

“(d) annual performance review (APR) shall be conducted for the variations in

performance on account of uncontrollable parameters for each year of the control

period vis-à-vis the ARR approved in the first year of the control period for those

years;

(dd) mid-term performance review (MPR) shall be conducted for the year after the

mid-year of the control period and shall comprise the annual performance review

for that year on account of uncontrollable parameters and for the variations in

performance on account of controllable parameters for the control period vis-à-vis

the ARR approved in the first year of the control period; ”

(c) for clause (f), the following clause (f) shall be substituted, namely:-

“(f) Variation in revenue/cost on account of uncontrollable parameters shall be trued

up annually during the annual performance review.”

4581

jkti=] fgekpy izns'k] 4 uoEcj 2013@13 dkfrZd 1935

3. Insertion of provisos to regulation 7.—At the end of regulation 7 of the said

regulations, the following provisos shall be inserted, namely:-

“Provided that the Commission may, while setting the targets, also incorporate suitable

mechanisms for automatic adjustments in these targets in case of substantial changes in the

basic assumptions/ inputs taken into account and may also provide for the requirements in

respect of such components of the O&M expenditure as it may consider appropriate as per

actual:

Provided further that, based upon abnormal variations in controllable parameters

(distribution losses, operation and maintenance expenditure, financing cost and

depreciation) and for reasons beyond the control of the distribution licensee, the

Commission may, at the time of mid-term performance review, review the approved

expenditure vis-à-vis the actual expenditure for these controllable parameters and revise the

targets set for the balance years of the control period.”

4. Amendment of regulation 9.—In regulation 9 of the said regulations –

(a) in sub regulation (4), for clause (d), the following clause (d) be substituted,

namely:-

“ (d) Financing plan showing the details for funding of the proposed investment

i.e. through loan from financial institutions, equity grants and subsidies and

consumer contribution, if any, for the specific work and utilization of other

capital receipts as per provisions of HPERC (Recovery of Expenditure for

Supply of Electricity) Regulations, 2012;”

(b) for the sub-regulation (6), the following sub-regulation (6) shall be substituted,

namely:-

“(6) The Commission may review the capital expenditure incurred and capitalization

at the end of each year of the control period vis-à-vis the approved capital

expenditure and capitalization schedule. In the normal course, the Commission

shall not revisit the approved capital investment plan (capital expenditure and the

capitalization schedule) on yearly basis during the control period and adjustments

to depreciation, interest on capital loan and return on equity on account of

variations for the actual capital expenditure incurred and capitalization made vis-

à-vis approved capital investment plan (capital expenditure and capitalization),

shall be done during the mid-term performance review and at the time of end of

control period true up.”

5. Amendment of regulation 11 – For existing regulation 11 of the said regulations, the

following regulation 11 shall be substituted, namely:-

“11. True Up

(1) The true up across various parameters shall be conducted by the Commission, for the

previous years for which the actual/ audited accounts are made available by the

distribution licensee, at the times and as per principles stated below:-

(A) at the times –

(i) for the previous years of the previous control period for which true-up has not

been carried out and/or for the previous control period:- true up shall be done

along with the MYT/APR petition(s) filed for/during the control period;

4582

jkti=] fgekpy izns'k] 4 uoEcj] 2013@13 dkfrZd 1935

(ii) for the previous years of the control period:- true up shall be done along with the

annual performance reviews (APRs) filed during the control period;

(iii) for the control period and/or for the years of the control period for which true-up

is not carried out during the control period- true up shall be done along with the

MYT/APR petition(s) filed for/during the next control period;

Provided that the Commission may entertain true up proposals even prior to the above times

if the accounts of the licensee are finalized;

(B) as per principles –

(a) Variation in revenue / expenditure on account of uncontrollable sales and power

purchase shall be trued up every year. Truing-up shall be carried out based on the

actual/audited information and prudence check by the Commission:

Provided that if such variations are large, and it is not feasible to recover in one

year alone, the Commission may take a view to create a regulatory asset, as per

the guidelines provided in clause 8.2.2 of the National Tariff Policy:

Provided further that under business as usual conditions, the Commission, to

ensure tariff stability, may include the opening balances of uncovered gap /trued-

up costs in the subsequent control period’s ARR instead of including in the year

succeeding the relevant year of the control period after providing for transition

financing arrangement or capital restructuring;

(b) for controllable parameters –

(I) any surplus or deficit on account of the O&M expenses shall be to the account of

the licensee and shall not be trued up in ARR unless such is treated as

uncontrollable by the Commission in accordance with these regulations;

(II) any surplus or deficit on account of the distribution losses shall be shared between

the licensee and the consumers in accordance with these regulations;

(III) during mid-term performance review and during the end of the control period true

up –

(i) O&M expenses treated as uncontrollable may be trued-up on the basis of

actual/ audited information and prudence check by the Commission;

(ii) any surplus or deficit on account of variations in the costs and targets of

distribution losses treated as uncontrollable, may be trued-up on the basis of

actual/ audited information and prudence check by the Commission and shall

be shared between the licensee and the consumers in accordance with these

regulations;

(iii) the Commission shall review the actual capital investment vis-à-vis approved

capital investment;

4583

jkti=] fgekpy izns'k] 4 uoEcj 2013@13 dkfrZd 1935

(iv) depreciation and financing cost, which includes cost of debt including

working capital (interest), cost of equity (return) shall be trued up on the

basis of actual/ audited information and prudence check by the Commission.

(2) The distribution licensee, for the approved true-up of any year over and above that

approved in the Tariff Order for that year, shall be entitled to a carrying cost at the

Base Rate of State Bank of India plus 350 basis points and for any true-up resulting in

less than that approved in the Tariff Order for that year, the carrying cost shall be

recovered at the same rate.

(3) Notwithstanding anything contained in these regulations, the gains or losses in the

controllable items of ARR on account of force majeure, change in law and change in

taxes and duties after adjusting for proceeds from any insurance scheme, if any, shall

be passed on as an additional charge or rebate in ARR over such period as may be

mentioned in the order of the Commission.”

6. Substitution of regulation 14.—For regulation 14 of the said regulations, the

following regulation 14 shall be substituted, namely:-

“14. Cost of Power Procurement

(1) The licensee shall forecast sales for each customer category and sub-categories for all

years of the control period as well as the corresponding source wise power

procurement in their business plan filings, for the Commission’s review and approval.

The category-wise sale forecast shall be applied alongwith distribution loss trajectory

for estimating the licensees’ power procurement for each year of the control period:

Provided that, such sales forecast and power procurement planning proposed by the

licensee for providing unrestricted/ round the clock supply to the consumers, shall take

into consideration factors such as past trends and various econometric factors giving

due consideration to economic condition, anticipated development and growth in the

State, etc. using appropriate methodologies and techniques.”

(2) The distribution licensee shall be allowed to recover the cost of power it procures in

the most economical manner from sources approved by the Commission (viz. intra-

State and inter-State trading licensees, bilateral purchases, bulk suppliers, State

generators, independent power producers, Central generating stations, renewable and

co-generation sources, generation business of the distribution licensee and other

sources) at tariff rates approved by the appropriate Commission from time to time:

Provided that the distribution licensee shall propose the cost of power procurement

taking into account the fuel adjustment formula specified for the generating stations

and net revenues/ costs through bilateral exchanges and unscheduled interchange (UI)

transactions:

Provided further that, where the licensee utilizes a part of the power purchase approved

or bulk supply allocated or contracted for the retail supply business for its trading

business, the distribution licensee shall provide an allocation statement clearly

specifying the cost of power purchase that is attributable to such trading activity:

4584

jkti=] fgekpy izns'k] 4 uoEcj] 2013@13 dkfrZd 1935

Provided also that, to facilitate round-the-clock supply to all the consumers in the

State, the licensee shall in accordance with these regulations, prepare a detailed power

procurement plan comprising reasonable contingent surplus.

(3) While approving the cost of power purchase, the Commission shall determine the

quantum of power to be purchased from various sources in accordance with the

principles of merit order of power purchase. All power purchase costs will be

considered legitimate unless it is established that the merit order principle has been

materially violated or power has been purchased at unreasonable rates.

(4) The renewable purchase obligation of the distribution licensee will be as per the

relevant regulations made by the Commission.

(5) The licensee shall avail maximum rebate available from each source for early payment

of power purchase bills such as through letter of credit:

Provided that, 25% of the maximum normative rebate available to the licensee shall be

allowed to be retained by him and the remaining 75% of the maximum normative

available rebate shall be adjusted in the Power Procurement Cost:

Provided further that, the delayed payment surcharge, if any, paid by the licensee

against the Power Purchase Bills shall be to the account of the licensee.”

7. Substitution of regulation 15.—For regulation 15 of the said regulations, the

following regulation 15 shall be substituted, namely:-

“15. Distribution Losses

(1) The target for the distribution loss levels to be achieved by the distribution licensee

during the control period and the year-wise loss reduction trajectory for the control

period shall be fixed in the multi-year tariff order:

Provided that, the Commission may, based upon the actual information submitted by

the licensee in respect of variations in the mix of consumers or sales at various voltage

levels vis-à-vis that already approved, at the time of mid-term performance review,

review the costs approved vis-à-vis the actual on account of the distribution loss and

revise the targets set for the distribution loss for the balance years of the control period:

Provided further that, the mechanism for pass-through of gains or losses on account of

variations in the distribution loss as a result of revision in costs and targets vis-à-vis

that approved shall be as follows:-

(a) The approved aggregate gain to the distribution licensee on account of

controllable factor of distribution loss shall be dealt with in the following

manner:-

(i) 40% of the amount of such gains shall be adjusted in ARR over such period

as may be stipulated in the Order of the Commission;

(ii) The balance 60% of such gains, may be utilized at the discretion of the

distribution licensee;

4585

jkti=] fgekpy izns'k] 4 uoEcj 2013@13 dkfrZd 1935

(b

The approved aggregate loss to the distribution licensee on account of

controllable factor of distribution loss shall be dealt with in the following

manner:-

(i) 40% of the amount of such loss may be passed on in the ARR over such

period as may be stipulated in the Order of the Commission; and

(ii) The balance 60% of amount of such loss shall be absorbed by the licensee;

(c) Gains and losses on account of controllable factors during the control period shall

be shared in the aforesaid manner at the time of mid-term Performance Review

and also at the time of tariff determination process of the next control period;

(d) The gain or loss on account of controllable factors other than the distribution loss,

unless otherwise specifically provided by the Commission in these Regulations,

shall be to the account of the distribution licensee;

(2) The licensee shall also propose circle-wise baseline distribution loss levels and loss

reduction trajectory for each year of the control period. The distribution licensee shall

also propose voltage-wise losses for each year of the control period for the

determination of voltage-wise cost of supply and determination of voltage-wise

wheeling tariff:

Provided that, till the actual data on voltage wise losses is not available, the

distribution licensee shall submit best estimates of the voltage-wise losses.

(3) The Commission may fix circle-wise and voltage-wise losses with suitable

mechanisms and modifications as it may consider necessary. On the basis of circle-

wise distribution loss, the Commission may fix circle-wise differential tariff by way of

separate and distinct distribution loss surcharge. ”

8. Amendment of Regulation 17.—In regulation 17 of the said regulations –

(a) after sub-regulation (1), the following sub-regulation (1-a) shall be inserted,

namely:-

“ (1-a) O&M Norms –

(i) The licensee shall propose separate trajectories of norms for each of the

components of O&M expenses viz., employee cost, R&M expense and A&G

expense;

(ii) Norms shall be defined in terms of combination of number of personnel for

various activities such as per 1000 consumers and number of personnel per

substation, line length alongwith annual expenses per personnel for Employee

expenses combination of A&G expense per personnel and A&G expense per 1000

consumers for A&G expenses and R&M expense as percentage of gross fixed

assets for estimation of R&M expenses;

(iii) One-time expenses such as expense due to change in accounting policy, arrears

paid due to pay commissions and interim relief etc., shall be excluded from the

norms in the trajectory;

4586

jkti=] fgekpy izns'k] 4 uoEcj] 2013@13 dkfrZd 1935

(iv) The expenses beyond the control of the distribution licensee such as dearness

allowance, pension liabilities and terminal benefits in Employee cost etc., shall be

excluded from the norms in the trajectory;

(v) The One-time expenses and the expenses beyond the control of the Distribution

Licensee as per sub-regulations (c) and (d) above shall be allowed by the

Commission over and above normative Operation & Maintenance Expenses after

prudence check;

(vi) The norms in the trajectory shall be proposed over the control period with due

consideration to productivity improvements and commercial viability;

(vii) The norms shall be proposed at constant prices of base year and escalation on

account of inflation shall be over and above the baseline;

(viii) The Distribution Licensee shall also carry out absolute and relative analysis while

proposing the norms;

(ix) In absolute analysis, Distribution Licensee’s audited accounts of operations for

last three years, expenses claimed for control period, historically approved cost,

and prudence check shall be used by the Commission to estimate values of norms;

(x) In relative analysis, performance parameters of other Distribution Licensees

within the same state or in other states shall be considered by the commission to

estimate norms:

Provided that other Distribution Licensees so chosen shall have similar profile as

that of the Distribution Licensee under consideration in terms of consumer mix,

type of license area (city, state, etc.) type of distribution networks, viz,

underground/overhead, HT-LT ratio, etc;

(xi) Suitable average of outcomes of absolute and relative analysis may be taken by

the licensee while proposal the norms over the control period for the distribution

licensee;

(xii) Based on the proposal submitted by the licensee, the Commission shall fix the

norms for the said purposes which shall be taken into account for determining the

trajectories for various components of O&M expenses for the remaining years of

the control period;

(xiii) Till such time the norms are fixed by the Commission, the trajectories of various

components of O&M expenses shall be submitted by the licensee and determined

by the Commission on the basis of the actual costs for the previous years in

accordance with the provisions of these regulations;”

(b) for the sub-regulation (3), the following sub-regulation (3) shall be substituted,

namely:-

“(3) The O&M expenses for the nth year of the control period shall be approved

based on the formula given as follows:-

O&Mn = R&Mn + EMPn + A&Gn :

4587

jkti=] fgekpy izns'k] 4 uoEcj 2013@13 dkfrZd 1935

Where –

R&Mn = K x GFA n-1 ;

EMPn = [(EMPn-1) x (1+Gn) x (CPIinflation)] + Provision(Emp) ;

A&Gn = [(A&Gn-1) x (WPIinflation)] + Provision(A&G) ;

‘K’ is a constant (could be expressed in %). Value of K for each year of the

control period shall be determined by the Commission in the MYT Tariff

order based on licensee’s filing, benchmarking of R&M expenses, approved

R&M expenses vis-à-vis GFA approved by the Commission in past and any

other factor considered appropriate by the Commission;

CPIinflation – is the average increase in the Consumer Price Index (CPI) for

immediately preceding three or five years before the base year, whichever is

higher;

WPIinflation – is the average increase in the Wholesale Price Index (CPI) for

immediately preceding three or five years before the base year, whichever is

higher;

EMPn-1 & EMPn – employee costs of the distribution licensee for the (n-1)th

and nth year; (employee cost for the base year would be adjusted for

provisions for (n-1)th year for the items corresponding to clauses (iii), (iv)

and (v) of subregulation (1-a) of regulation 17);

Provision(Emp): Provision corresponding to clauses (iii), (iv) and (v) of

subregulation (1-a) of regulation 17, duly projected for relevant year for

expenses beyond control of the distribution licensee and expected one-time

expenses as specified above;

A&Gn-1 & A&Gn – administrative and general costs of the distribution

licensee for the (n-1)th and nth year;

Provision(A&G): Cost for initiatives or other one-time expenses as proposed by

the distribution licensee and validated by the Commission;

R&Mn-1 R&Mn – repair and maintenance costs of the distribution licensee for

the (n-1)th and nth year;

GFAn-1 – Gross Fixed Asset of the distribution licensee for the (n-1)th year;

Gn is a growth factor for the nth year. Value of Gn shall be determined by the

Commission in the MYT tariff order for meeting the additional manpower

requirement based on licensee’s filings, benchmarking, and approved cost by

the Commission in past and any other factor that the Commission feels

appropriate:

Provided that, R&M expenses determined shall be utilised towards R&M

works only;

4588

jkti=] fgekpy izns'k] 4 uoEcj] 2013@13 dkfrZd 1935

Note: After the fixation of norms of various components of O&M expenses

as per these regulations, the above formulae shall be suitably modified in line

with the provisions.”

9. Substitution of regulation 22.—For existing regulation 22 of the said regulations, the

following regulation 22 shall be substituted, namely:-

“22.

Interest Charges on Working Capital

Rate of interest on working capital shall be on normative basis and shall be equal

to the average base rate of the last six months prior to the filing of the MYT

petition plus 350 basis points. The interest on working capital shall be payable on

normative basis notwithstanding that the licensee has not taken working capital

loan from any outside agency or has exceeded the working capital loan based on

the normative figures. The Commission shall calculate working capital

requirement for wheeling and retail supply business in accordance with these

regulations to arrive at working capital requirement of distribution licensee.”

10. Amendment of regulation 25.—For sub-regulation (1) of regulation 25 of the said

regulations, the following sub-regulation (1) shall be substituted, namely:-

“(1) All incomes being incidental to electricity business and derived by the licensee

from sources, including but not limited to profit derived from disposal of assets,

rents, meter rent (if any), income from investments other than contingency

reserves, miscellaneous receipts from the consumers but excluding delayed

payment surcharge and income to licensed business from the other business of the

distribution licensee shall constitute non-tariff income of the licensee.”

11. Amendment of regulation 26.—For regulation 26 of the said regulations, the

following regulation 26 shall be substituted, namely:-

“26. Other Income of the Licensee

(1) Where the licensee is engaged in any other business, the income from such

business will be calculated in accordance with the Himachal Pradesh Electricity

Regulatory Commission (Treatment of Income of Other Businesses of

Transmission Licensees and Distribution Licensees) Regulations, 2005 and shall

be deducted from the aggregate revenue requirement in calculating the revenue

requirement of the licensee.

(2) The licensee shall maintain separate accounts and sub balance sheets for each of

the other business such as Generation (existing stations), Survey & Investigation

of new power projects, investments in the existing new projects etc.

Provided that the licensee shall follow a reasonable basis for allocation of all joint and

common costs between the distribution business and the other business and shall

submit the allocation statement, as approved by its board of directors, to the

Commission alongwith his application for determination of tariff:

Provided further that where the sum total of the direct and indirect costs of such other

business exceeds the revenues from such other business or for any other reason, no

4589

jkti=] fgekpy izns'k] 4 uoEcj 2013@13 dkfrZd 1935

amount shall be allowed to be added to the aggregate revenue requirement of the

licensee on account of such other business.”

12. Amendment of regulation 27.—In regulation 27 of the said regulations-

(a) At the end of sub-regulation (1) of regulation 27 of the said regulations, the

following provisos shall be inserted, namely:-

“Provided that, to promote cogeneration and generation of electricity from

renewable energy sources, the Commission while determining the wheeling

charges shall give due consideration to the Renewable Purchase Obligation of the

distribution licensee:

Provided further that, the Commission based upon high energy consumption of

commercial, industrial and any other consumer category may determine the

threshold of such high consumption and levy a green charge in the form of

surcharge upon such consumers. ”

(b) for sub-regulation (2), the following sub-regulation (2) shall be substituted,

namely:-

“(2) The distribution licensee shall maintain separate books of accounts for wheeling

and retail supply business. For such period until accounts are segregated and

separate books of accounts are maintained, the Commission shall stipulate the

ratio of allocation of all expenses and return component, based on data obtained

from the distribution licensee.”

13. Amendment of regulation 29 .—In regulation 29 of the said regulations, for the

words and figure “in accordance with regulation 19”, the words “in accordance with these

regulations” shall be substituted.

14. Substitution of regulation 34.—For existing regulation 34 of the said regulations, the

following regulation 34 shall be substituted, namely:-

“34. Quality of Supply and Services

(1) The quality of supply and the customer service parameters shall be monitored as

per the norms specified by the Commission from time to time.

(2) The licensee shall propose baseline and performance trajectory for quality

parameters for wheeling and retail supply business in its business plan as

specified in the Standards of Performance Regulations framed under sub-section

(1) of section 57 and sub-section (1) of section 59, read with clauses (za) and (zb)

of sub-section (2) of section 181, of the Act.

(3) The Commission shall make an assessment on reliability of baseline data and may

prescribe the performance trajectory for each identified parameter for the control

period which shall be complied with by the distribution licensee. The Commission

shall develop a performance framework to encourage licensees to improve quality

of supply and services.

4590

jkti=] fgekpy izns'k] 4 uoEcj] 2013@13 dkfrZd 1935

(4) Recovery of the Annual Revenue Requirement determined as per the norms under

these regulations shall be based on achievement of the target availability index as

follows:-

(a) The Availability index shall be computed for both Wheeling Business and

Supply Business of the Distribution Licensee on yearly basis as per

following:-

(i) For Wheeling Business:

Wheeling Network Availability Index (%) = (1-(SAIDI/8760)) X 100

Where,

SAIDI = calculated under HPERC (Distribution Performance

Standards) Regulations, 2010;

(ii) For Supply Business:

The Supply Availability shall be measured on the basis of power

contracted by the Distribution Licensee on a long-term basis as per the

power procurement plan under following heads:

Base Load Supply Availability = ((Actual Contracted Base Load Supply

(MW)) X (Number of Off-Peak hours))/ ((Base Load in MW) X

(Number of Off-Peak hours));

Peak Load Supply Availability=((Actual Contracted Peak Load

Supply(MW)) X (Number of Peak hours))/ ((Peak load in MW)X

(Number of Peak hours));

Supply Availability Index = 75% of Base Load Supply Availability +

25% of Peak Load Supply Availability;

(b) The distribution licensee shall maintain data on planned maintenance

outages, load shedding, force majeure outages and trippings;

(c) The incentive/disincentive shall exclude the circumstances when the actual

supply differs from the contracted supply due to force majeure situations,

weather conditions, extreme monsoon failure, station outages, etc. which are

beyond the control of the Distribution Licensee;

(d) The Commission shall specify progressively increasing normative levels of

Availability for Wires and Supply Business of the Distribution Licensee on

the basis of past performance over the control period;

Provided that the Availability of Supply Business shall not be lower than

90% and shall gradually increase to 95%;

(e) The gains and losses in the ARR shall be considered as ±0.2% of ARR or

any other percentage as may be determined by the Commission for every

percentage point increase/decrease in availability vis-à-vis the normative

levels of availability:

4591

jkti=] fgekpy izns'k] 4 uoEcj 2013@13 dkfrZd 1935

Provided that the maximum additional return that can be earned/reduced

shall be = ±2% of ROE or any other percentage as may be determined by the

Commission.”

15. Substitution of regulation 36.—For existing regulation 36 of the said regulations, the

following regulation 36 shall be substituted, namely:-

“36. Beginning of the control period – business plan filings

In the base year, prior to the filing of multi-year ARR cum Tariff petition, the

distribution licensee shall file a business plan approved by its board of directors. The

business plan shall be for the entire control period and shall, inter-alia, contain –

(a)

sales/demand forecast for each customer category and sub-categories for each

year of the control period;

(b)

distribution loss reduction trajectory for each year of the control period;

(c)

collection efficiency for each year of the control period;

(d)

power procurement plan – comprising monthly/annual Demand (MW) and

Energy (MU) requirements, along with economic depictions, based upon the

power

procurement

sources

(existing/upcoming),

sales

forecasts

(restricted/unrestricted demand, base load/peak load/off load power requirement)

and distribution loss trajectory and may also include energy conservation, energy

efficiency and demand side management measures:

Provided that, the licensee may source its primary power requirements from

longterm/medium-term sources and only unforeseen shortfalls may be sourced

from short-term sources:

Provided further that, an additional quantum of 5% of the power requirement may

be kept as contingent surplus to take care of events resulting in shortfall on

account of reasons beyond the control of the licensee:

Provided also that, where the Commission has stipulated a percentage of the total

consumption of electricity in the area of a distribution licensee to be purchased

from co-generation and renewable sources of energy, the power procurement plan

of such distribution licensee shall include the plan for procurement from such

sources at least up to the specified level;

(e)

capital investment plan (CAPEX plan): The Commission shall approve the capital

investment of the licensee for the control period, the CAPEX plan being based

upon load forecasts, load flow studies/power evacuation plans/plan drawn by the

State Transmission Utility (STU), system improvement (distribution loss

reduction, reliability / quality of supply etc.) and the corresponding capitalization

schedule and financing plan, the appropriate capital structure of each scheme

proposed and cost of financing (interest on debt and return on equity), terms of

loan agreements, etc:

Provided that, the consumer contributions towards cost of capital assets and the

assets so created shall be accounted for separately as per standard accounting

principles;

4592

jkti=] fgekpy izns'k] 4 uoEcj] 2013@13 dkfrZd 1935

(f)

Operation & Maintenance (O&M): The filing shall be in accordance with the

provisions of sub-regulation (1-a) of regulation 17 of these regulations and shall

include the fresh recruitments proposed at various levels and the major Repair and

Maintenance (R&M) works proposed during each year of the control period along

with estimated costs;

(g)

details of depreciation based on the useful life of the asset and capitalization

schedules for each year of the control period;

(h)

a set of targets proposed for other items such as collection efficiency, bad debts,

working capital, quality of supply targets, etc. The targets shall be consistent with

the capital investment plan proposed by the licensee;

(i)

proposals for other items such as external parameters used for indexation

(inflation, etc);

(j)

other information: this shall include any other details considered appropriate by

the distribution licensee for consideration during determination of tariff; and

(k)

the filings in addition to the control period data, shall also contain the data for the

cost and revenue parameters for the last three years.”

16. Substitution of regulation 37.—For existing regulation 37 of the said regulations, the

following regulation 37 shall be substituted, namely:-

“ 37.

Aggregate Revenue Requirement (Multi-year, APR and MPR) and tariff

filings during the control period

(1) The distribution licensee shall file not less than 120 days before the

commencement of the first year of the control period or such other date as

may be directed by the Commission, an application for approval of multi-

year Aggregate Revenue Requirement (ARR) for each year of the control

period and determination of wheeling and retail supply tariff for the first year

of the control period.

(2) For the subsequent years of the control period, in the APR and MPR filings,

the distribution licensee shall file not less than 120 days before the

commencement of the respective year of the control period or such other date

as may be directed by the Commission, an application for the approval of

annual Aggregate Revenue Requirement (ARR) and for determination of

wheeling and retail supply tariff for the respective year.

(3) The licensee for the APR shall file for adjustments to multi-year ARR

approved in first year of control period on account of uncontrollable

parameters and for the MPR shall file for adjustments to approved multi-year

ARR on account of both controllable and uncontrollable parameters:

Provided that the during the MPR, the Commission may revise the

trajectories for various controllable parameters for the remaining period of

the control period and this shall be deemed to give consequential effect to the

ARR approved in the first year of the control period.

4593

jkti=] fgekpy izns'k] 4 uoEcj 2013@13 dkfrZd 1935

(4) The filings for wheeling tariff shall contain the following:-

(a) the distribution system or network usage forecast for each year of the

control period, consistent with the business plan;

(b) proposals for computation of tariffs for wheeling of electricity for each

of the years of the control period, including the voltage-wise losses,

adjustment of losses in the system and the procedure thereof;

(c) proposals for non-tariff income, with item-wise description and details;

(d) proposals in respect of income from other businesses like consultancy

services, convergence, training facilities, etc;

(e) proposed energy based wheeling tariff (voltage-wise);

(f) expected revenue from the proposed wheeling tariff, including

additional surcharge etc.

(5) The filings for retail supply tariff shall contain the following:-

(a) the licensee’s proposal for retail sale of electricity for the consumers

pertaining to retail supply business, which shall include energy sales,

tariffs for each consumer category, slab-wise and voltage-wise. The

proposed tariff may also be based on energy charges, demand charges,

minimum charges, etc alongwith the tariff rationalization measures;

(b) proposal for power procurement quantum based upon energy sales and

distribution losses, cost of power purchase, transmission and load

despatch charges etc;

(c) proposals for non-tariff income with item-wise description and details;

(d) proposals in respect of income from other businesses like consultancy

services, convergence, training facilities, etc;

(e) expected revenue from the proposed retail supply tariff, and other

matters considered appropriate by the distribution licensee, including

incentive schemes to consumers, cross-subsidy surcharge, etc;

(f) Each tariff proposal submitted by the distribution licensee shall be

progressively compliant of the various principles enunciated in the

regulation 41-B of these regulations and demonstrate that the tariffs are

progressively reflecting the cost of supply.

(6) The licensee shall furnish to the Commission, such additional information,

particulars and documents as the Commission may require from time to time

after such filing of revenue calculations and tariff proposals.

(7) The licensee shall publish, for the information of the public, the contents of

the application in an abridged form in such manner as the Commission may

direct and shall host the complete copy of the filing on its website and shall

4594

jkti=] fgekpy izns'k] 4 uoEcj] 2013@13 dkfrZd 1935

also provide copies of the documents filed with the Commission to any

person at a price not exceeding normal photocopying charges. ”

17. Substitution of regulation 38.—For existing regulation 38 of the said regulations, the

following regulation 38 shall be substituted, namely:-

“38. Review during the control period

(1) The distribution licensee shall submit information as part of annual review on actual

performance vis-à-vis performance targets approved by the Commission at the

beginning of the control period, profit sharing mechanism for exceeding the targets,

and implementation of performance framework for quality of supply targets.

(2) The revised estimates shall be required because of trued-up costs on account of

variations in uncontrollable parameters in respect of APR and variations in both

controllable and uncontrollable parameters in respect of MPR. ”

18. Addition of regulation 41-A.—After regulation 41 of the said regulations, the

following new regulation 41-A. shall be added, namely:-

“ 41-A. Adherence to Tariff Order

(1) If the distribution licensee recovers a price or charge exceeding the tariff determined

under Section 62 of the Act and in accordance with these Regulations, the excess

amount shall be recoverable by the person who has paid such price or charge, along

with interest equivalent to the Base Rate of State Bank of India plus 350 basis points

without prejudice to any other liability incurred by the distribution licensee.

(2) The distribution licensee shall submit periodic returns as may be required by the

Commission, containing operational and cost data to enable the Commission to

monitor the implementation of its Order.”

19. Amendment of Title “SUBSIDY” of Part V of the Regulations.—For the existing

title of Part V of the said regulations, the following title shall be substituted, namely:-

“SUBSIDY, COST of SUPPLY and CROSS SUBSIDY”

20. Addition of regulation 41-B.—Before regulation 42 of the said regulations, the

following regulation 41-B shall be added, namely:-

“41-B. Cost of Supply and Cross Subsidy

(1) In accordance with the National Electricity Policy and National Tariff Policy, the

Commission shall allow recovery of efficient and prudent cost of supply of electricity

by the licensee from the consumers to make the power sector sustainable.

(2) The Commission shall be guided by the objective that the tariff progressively reflects

the efficient and prudent cost of supply of electricity. The Commission shall also

continuously endeavour to rationalise the tariff structures to encourage efficient and

prudent end use of electricity.

4595

jkti=] fgekpy izns'k] 4 uoEcj 2013@13 dkfrZd 1935

(3) The Commission shall progressively and gradually reduce the existing cross subsidies

without giving tariff shocks to any consumer category and to achieve the objective the

Commission shall –

(a) restrict the cross subsidy, while fixing the tariff for 2014-15, for various consumer

categories other than the life line domestic consumers, to a level of (±)20% of the

average cost of supply;

(b) indicate a roadmap for reduction and/or rationalization of cross subsidies in the

MYT Orders for the Control Periods starting from 1.4.2014 and thereafter. The

road map shall be based on the approach of a gradual reduction/rationalization in

cross subsidy, guided by the principles laid down in the National Tariff Policy,

with a target that by the end of the control period starting from 1.4.2014 tariffs for

the consumer categories, other than the life line category, are within (-)15% to (+)

10% of the average cost of supply and by the end of the subsequent control

period, the same are within (-)10% to (+) 5%;

(c) The life line domestic consumers shall continue to receive a special support

through cross subsidy:

Provided that the tariff of the life line domestic consumers shall not be less than

50% of the average cost of supply.

(4) Till such time the overall average per unit tariffs for various categories, other than Life

line category, are brought within (-)10% to (+)5% of the average cost of supply as per

sub regulation (3) the Commission shall base the tariff fixation exercise during such

interim periods on the basis of average cost of supply.

(5) During the interim periods as mentioned as sub regulations (3) and (4), the

Commission shall, with an objective of broadly assessing, the trends and levels of

category wise cost of supply for indicative purposes also carry out suitable exercise

based on the available data, suitable assumptions and the concepts as may be

considered appropriate. The Commission shall broadly follow the following

methodologies for allocation of costs for the purpose of cost to serve calculations.

(a) Functionalization and classification of Cost – Total cost shall be divided on the

basis of functions performed such as power purchase, distribution etc. Each of the

functionalized cost shall be further classified, based on its intrinsic nature into

Demand related cost, Energy related cost and Customer related cost. Demand

related costs shall generally be of fixed nature related to capacity creation and

shall include interest on capital borrowing, depreciation etc. Energy cost shall be

related to quantum of electricity consumption of consumer, such as fuel cost,

interest on working capital, etc. Consumer related cost shall include operating

expenses associated with meter reading, billing and accounting;

(b) Allocation of Costs –

(i) Allocation of Demand Costs: Demand costs various functions shall be

allocated among consumer categories on the basis of average estimated

demand of the consumer categories during different hours of the day and

different seasons of the year;

4596

jkti=] fgekpy izns'k] 4 uoEcj] 2013@13 dkfrZd 1935

(ii) Allocation of Energy Costs : Energy related costs of Distribution functions

shall be allocated to the consumer categories on the basis of incremental cost

of power purchase by following merit order and block approach beyond the

minimum common level of load factor:

Provided that the cost of additional 5% power kept as contingent surplus in

accordance with these regulations may be allocated to all the consumer

categories in proportion to the total electricity consumption of each category:

Provided further that the energy flows from HT system to EHT system

during certain situations which are typically prevalent in Himachal Pradesh

on account of small hydro projects shall also be duly considered while

allocating the distribution losses to various categories of consumers;

(iii) Allocation of Customer Costs: Customer related costs shall be allocated to

consumer categories by assigning suitable weights duly taking into account

to average consumption per consumer for various categories of consumers.”

By order of the Commission

Sd/-

Secretary.

_________

HIMACHAL PRADESH ELECTRICITY REGULATORY COMMISSION

SHIMLA

NOTIFICATION

Shimla, 1st November, 2013

No. HPERC/F(5)(3)(1)(Retail).—In exercise of the powers conferred by sub-regulation (1)

of regulation 35 and regulation 44 of the Himachal Pradesh Electricity Regulatory Commission

(Terms and Conditions for Determination of Wheeling Tariff and Retail Supply Tariff)

Regulations, 2011 and regulations 8 and 10 of the Himachal Pradesh Electricity Regulatory

Commission (Guidelines and Formats for Tariff Filing) Regulations, 2005, read with section 21 of

the General Clauses Act, 1897 (Act No. 10 of 1987) and all the powers enabling it in this behalf,

the Himachal Pradesh Electricity Regulatory Commission, hereby makes the following Order to

revise the formats for the Multi Year Tariff filings by the distribution licensee for the control period

starting from 1st April, 2014 and thereafter, namely:-

ORDER

1. Short title and commencement.—This Order may be called the Himachal Pradesh

Electricity Regulatory Commission (Formats for Multi Year Tariff Filings by the Distribution

Licensee) Order, 2013.

(2) This Order shall come into force on the date of its publication in the Rajpatra,

Himachal Pradesh.

2.

Definitions.—In this order, unless the context otherwise requires,-

(a) “Act” means the Electricity Act, 2003 (Act No. 36 of 2003);

4597

jkti=] fgekpy izns'k] 4 uoEcj 2013@13 dkfrZd 1935

(b) “Annexure” means the annexure to this Order;

(c) “Form” means the Form annexed to this Order;

(d) “regulations” means the regulations made under the Act;

(e) the words and expressions used and not defined in this Order but defined in the

Act and the regulations framed thereunder shall have the meanings as assigned

them in the Act.

3. Forms for Multi Year Tariff Filings by the Distribution Licensee:-

(1) The Multi Year Tariff filing by the distribution licensee for the control period

starting from the 1st day of April, 2014 and thereafter shall be in the Forms as

given in the Annexure to this Order and hosted on hperc website www.hperc.org.

(2) The Forms laid down in the Annexure to this Order, with such modifications or

variations, as the circumstance of each case may require, shall be used for the

purpose mentioned therein and where no Form is laid down to cover a

contingency, Form as may be approved by the Commission shall be used.

By order of the Commission

Sd/-

Secretary.

________

Annexure

[See Para 3(1) of Order]

Index Of Regulatory Compliance Formats For Tariff Filing By Distribution Licensee:

A. SUMMARY FORMATS

1

S1

Annual Revenue Requirement

2

S2

Return on Equity

3

S3

Expenditure Allocation into Fixed, Variable & Other Costs

4

S4

Energy Balance

5

S5

Truing Up

B. FINANCIAL FORMATS

6

F1

Revenue from Tariff and Charges

7

F1a

Projection of sales,consumers & connected load

8

F1b

Monthly projections of Sales

9

F2

Revenue Grants & subsidies

10

F3

Income from investments and Non-Tariff Income

11

F4

Summary of HP Own Generation & Power Purchase

12

F4a

Power purchase Details

13

F4b

Intra State Transmission (TRANSCO) Charges

14

F5

R&M Expenses

15

F6

Employees' Cost & Provisions

16

F6A

Details of Employee Costs (actual expenditure incurred) 2012-13

17

F6B

Employee Strength & Deployment

18

F6C

Pension Contribution (other than Contributory Pension Scheme)

4598

jkti=] fgekpy izns'k] 4 uoEcj] 2013@13 dkfrZd 1935

19

F6D

Employee strength for the Control Period

20

F7

Administration & General Expenses

21

F8

Statement of Fixed Assets and Depreciation

22

F9

Interest & Finance charges

23

F9a

Domestic loans,bonds and financial leasing

24

F9b

Details of Existing Loans

25

F9c

Details of New Loans for each MYT Year

26

F10

Details of Expenses Capitalised

27

F11

Other Debits

28

F12

Statement of Sundry Debtors & provision for bad & doubtful debtors

29

F13

Extraordinary Items

30

F14

Net Prior Period Expenses/Income

31

F15

Contribution Grants & subsidies towards Capital assets

32

F16

Project-wise / Scheme-wise Capital Expenditure

33

F17

Statements of assets not in use

34

F18

Investments

35

F18A

Investments in Non business related activities

36

F19

Current Assets and Liabilities

37

F20

Working Capital Requirement

38

F21

Provison for Income Tax

C. TARIFF FORMATS

39

T1

Existing & Proposed Tariff

40

T2

Revenue from Current Tariffs in Ensuing Year

41

T3

Revenue from Proposed Tariffs in Ensuing Year

D. QUALITY OF SERVICE FORMATS

42

P1

Revenue Arrears and Agewise Analysis

43

P1a

Revenue Arrears of Government and Agewise Analysis

44

P2 T&D

Losses in LT and HT System

45

P2a

Losses in 33 KV system

46

P2b

Losses in 22 KV system

47

P2c

Losses in 11 KV system

48

P2d

Losses in LT system

49

P2e

Losses at EHV level

50

P2f

Circle-wise Losses

51

P3

Consumer Complaint

52

P4

Voltage Profile

53

P5

Technical Parameters

54

P6

Abstract of outages due to tripping in HT feeders

55

P7

Failure of Transformers

56

P8

Billing Periodicity

57

P9

Electrical Accidents

58

P10

Peak Demand

59

P11

Release of Customer bills

60

P12

Key Ratios

61

P13

Debt Restructuring

62

P14

Release of New service Connections

4599

jkti=] fgekpy izns'k] 4 uoEcj 2013@13 dkfrZd 1935

63

P15

Status of Metering

64

P16

Materials Management

65

P17

Audit Details

66

P18

Status of Pre-paid Metering

67

P19

Status of Unmanned sub-stations

HIMACHAL PRADESH ELECTRICITY REGULATORY COMMISSION

SHIMLA

NOTIFICATION

Shimla, the 1stNovember, 2013

No. HPERC/F(5)(3)(1)(Gen).—WHEREAS the Himachal Pradesh Electricity Regulatory

Commission has framed the HPERC (Terms and Conditions for Determination of Hydro

Generation Tariff) Regulations, 2011;

AND WHEREAS the Himachal Pradesh Electricity Regulatory Commission is making an

exercise to determine the tariff for hydro generation system of the generators for the next control

period starting from 1st April, 2014;

NOW, THEREFORE, in exercise of the powers conferred by clauses (zd), (ze) and (zf) of

sub-section (2) of section 181, read with sections 61, 62 and 86, of the Electricity Act, 2003 (36 of

2003) and all other powers enabling it in this behalf, and after previous publication, the Himachal

Pradesh Electricity Regulatory Commission makes the following amendments in the HPERC

(Terms and Conditions for Determination of Hydro Generation Tariff) Regulations, 2011 published

in the Rajpatra, Himachal Pradesh, dated 2nd April, 2011, namely:-

REGULATIONS

Short title, commencement and application.—(1) These regulations shall be called the

Himachal Pradesh Electricity Regulatory Commission (Terms and Conditions for Determination of

Hydro Generation Tariff) (Second Amendment) Regulations, 2013.

(2) These regulations shall come into force from the date of their publication in the

Rajpatra, Himachal Pradesh and shall be applicable for the tariff orders to be issued for the control

periods commencing with effect from 1st April, 2014 and thereafter.

1. Amendment of regulation 3.— In regulation 3 of the Himachal Pradesh Electricity

Regulatory Commission (Terms and Conditions for Determination of Hydro Generation Tariff)

Regulations, 2011 (hereinafter called the “said regulations”) –

(a) after clause (2), the following clause (2-a) shall be inserted, namely:-

“(2-a) “aggregate revenue requirement” or “ARR” means the costs pertaining to

hydro generating stations which are permitted, in accordance with these regulations, to

be recovered from the tariffs and charges determined by the Commission;”.

(b) in clause (4) the words “annual performance review” wherever appearing, the words

“mid-term performance review” shall be substituted.

(c) In clauses (19) and (20), for the figures “01.04.2011”, the words “first year of the

control period” shall be substituted.

4600

jkti=] fgekpy izns'k] 4 uoEcj] 2013@13 dkfrZd 1935

(d) after clause (23), the following clause (23-a) shall be inserted, namely:-

“(23-a) “mid-term performance review” or “MPR” means the review of performance

of the generator undertaken by the Commission for the year after the middle year of

the control period and this includes the True Up of the previous control period and

True Up of previous years of the control period;”.

(e) in clause (24) for the figures “01.04.2011”, the figure and words “1st April of the first

year of control period” shall be substituted.

(f) for clause (25) the following clause (25) shall be substituted, namely:-

“(25) “Normative Annual Plant Availability Factor” or “NAPAF” in relation to a

generating station means the availability factor as specified in the regulation on

‘Operational Norms’;”.

2. Substitution of regulation 9.— For regulation 9 of the said regulations, the following

regulation 9 shall be substituted, namely:-

“9. True Up

(1) The true up across various controllable parameters shall be conducted by the

Commission, for the previous years for which the actual/audited accounts are made

available by the generator, at the times and as per principles stated below: -

(A) at the times –

(i) for the previous years of the previous control period:- along with the petition

for determination of ARR cum generation tariff for the control period;

(ii) for the previous years of the control period and for the previous control

period:- along with the mid-term performance review during the control

period; and

(iii) for the control period true up:- along with the mid-term performance review

of the next control period;

(B) as per principles –

(i) the Commission shall review actual capital investment vis-à-vis approved

capital investment;

(ii) depreciation and financing cost, which includes cost of debt including

working capital (interest), cost of equity (return) shall be trued up on the basis

of actual/audited information and prudence check by the Commission; and

(iii) any surplus and deficit on account of O&M expenses shall be to the account

of the generating company and shall not be trued up in ARR.

(2) The gain or loss on account of other controllable factors, unless otherwise specifically

provided by the Commission shall be to the account of the generating company.

4601

jkti=] fgekpy izns'k] 4 uoEcj 2013@13 dkfrZd 1935

(3) Notwithstanding anything contained in these regulations, the gains or losses in the

controllable items of ARR on account of force majeure, change in law and change in

taxes and duties shall be passed on as an additional charge or rebate in ARR over such

period as may be laid down in the order of the Commission.”

3. Amendment of regulation 10.—In regulation 10 of the said regulations, for the words

“Short Term Prime Lending Rate of the State Bank of India” the words and figures “Base Rate of

the State Bank of India plus 350 basis points” shall be substituted.

4. Amendment of regulation 11.—In sub-regulation (2) of regulation 11 of the said

regulations, in the Eighth Proviso for the figures “01.04.2011” the words “the starting of the first

year of the control period” shall be substituted.

5.

Amendment of regulation 14.—At the end of sub-regulation (3) of regulation 14 of

the said regulations, the following proviso shall be inserted, namely:-

“Provided that variations in capital cost of such Renovation and Modernization works on

account of cost overruns beyond the value at which the works and/ or supplier are awarded

to EPC contractors/ Suppliers, 100% of the variation shall be considered as part of the

capital cost of the project if such can be attributed to a force majeure event or any other

reason beyond the control of the generator and if such cannot be attributed to any reason

beyond the control of the generator, then 50% of variation shall be considered as part of the

capital cost of the project.”

6. Amendment of regulation 19.—In regulation 19 of the said regulations, for the words

and figure “Short Term Prime Lending Rate of the State Bank of India as on the 1st April of the

relevant year” the words and figures “average Base Rate of State Bank of India for the last six

months prior to the filing of the MYT petition plus 350 basis points” shall be substituted.

7. Amendment of regulation 21.—In regulation 21 of the said regulations –

(a) for the sub-regulation (2), the following sub-regulation (2) shall be substituted,

namely:-

“(2) The rate of return on equity shall be computed by grossing up the base rate

with the normal tax rate as per latest available audited accounts of the

generating company:

Provided that in line with the provisions of the relevant Finance Acts of the

respective year, the return on equity with respect to the actual tax rate

applicable to the generating company during the years of the control period

shall be trued up separately for each year during the mid-term performance

review and at the end of the control period along with the tariff petition filed

for the next control period. ”

(b) in illustration (ii) to sub-regulation (3), for the figures and symbol “33.22%”, the

figures and symbol “32.99%” shall be substituted.

8. Substitution of regulation 22.—For regulation 22 of the said regulations, the

following regulation 22 shall be substituted, namely:-

“22. Operation and Maintenance (O&M) Expenses

(1) Operation and Maintenance (O&M) expenses shall comprise of the following:-

(a) salaries, wages, pension contribution and other employee costs;

4602

jkti=] fgekpy izns'k] 4 uoEcj] 2013@13 dkfrZd 1935

(b) administrative and general costs;

(c) repairs and maintenance; and

(d) other miscellaneous expenses including insurance costs, statutory levies and

taxes (except corporate income tax).

(2) Operation and maintenance expenses, for the existing generating stations which

have been in operation for 3 years or more as on 31 March 2013, shall be

derived on the basis of actual operation and maintenance expenses for the years

2010-11 to 2012-13, based on the audited balance sheets, excluding abnormal

operation and maintenance expenses, if any, after prudence check by the

Commission.

(3) In case of hydro generating stations, which have been in commercial operation

for less than 3 years as on 31 March 2013, the Operation and maintenance

expenses shall be fixed at 2% of the original project cost, excluding cost of

rehabilitation and resettlement works, and shall be escalated in accordance with

the escalation principles specified in sub-regulation (6).

(4) In case of the hydro generating stations declared under commercial operation

on or after 1.4.2013, operation and maintenance expenses shall be fixed at 2%

of the original project cost, excluding cost of rehabilitation and resettlement

works, and shall be escalated in accordance with the escalation principles

specified in subregulation (6).

(5) Post, determination of base O&M Expenses for the generator/generating

company in sub-regulation (2), the O&M expenses for the nth year and also for

the year immediately preceding the control period, shall be approved based on

the formula given below:-

O&Mn = R&Mn + EMPn + A&Gn:

Where –

‘O&Mn’ – Operation and Maintenance expenses for the nth year;

‘EMPn’ – Employee Costs for the nth year;

‘R&Mn’ – Repair and Maintenance costs for the nth year;

‘A&Gn’ – Administrative and General Costs for the nth year; and –

‘EMPn’ = [(EMPn-1) x (1+Gn) x (CPIinflation)] + Provision(Emp)

‘A&Gn’ = [(A&Gn-1) x (WPIinflation)] + Provision(A&G)

‘R&Mn’ = K x (GFA n-1 ) x (WPIinflation); and –

EMPn-1 – Employee Cost of the generator for the (n-1)th year; (employee cost

for the base year would be adjusted for provisions for expenses beyond the

control of the licensee and one time expected expenses, such as recovery/

4603

jkti=] fgekpy izns'k] 4 uoEcj 2013@13 dkfrZd 1935

adjustment of terminal benefits, implication of pay revisions, arrears and

interim relief);

‘Provision(Emp)’- Provision for expenses beyond control of the Generating

company and expected one-time expenses as specified above;

A&Gn-1 – Administrative and General Costs of the generator/generating

company for the (n-1)th year;

Provision(A&G): Cost for initiatives or other one-time expenses as proposed by

the generating company and approved by the Commission after prudence

check;

‘K’ is a constant to be specified by the Commission: % Value of K for each

year of the control period shall be determined by the Commission in the MYT

Tariff order based on generator/generating company’s filing, benchmarking of

repair and maintenance expenses, approved repair and maintenance expenses

vis-à-vis GFA approved by the Commission in past and any other factor

considered appropriate by the Commission;

CPIinflation – is the average increase in the Consumer Price Index (CPI) for the

three years immediately preceding the base year;

WPIinflation – is the average increase in the Wholesale Price Index (CPI) for the

three years immediately preceding the base year;

GFAn-1 – Gross Fixed Asset of the generator/generating company for the (n-1)th

year;

Gn is a growth factor for the nth year: Value of Gn shall be determined by the

Commission in the MYT tariff order for meeting the additional manpower

requirement based on generator/generating company’s filings, benchmarking,

approved cost by the Commission in past and any other factor that the

Commission feels appropriate. The Commission may also determine the

appropriate level of employees and provide a roadmap for rationalization of

employees during the control period:

Provided that repair and maintenance expenses determined shall be utilized

towards repair and maintenance works only.

(6) O&M expenses determined in sub-regulations (3) and (4), shall be escalated for

subsequent years to arrive at the O&M expenses for the control period by

applying the Escalation factor (EFk) for a particular year (Kth year) which shall

be calculated using the following formula:

EFk = 0.20xWPIInflation + 0.80xCPIInflation

Provided that, out of the O&M expenses so determined based on the above

regulations, at least 30% shall be spent towards repair and maintenance activities:

Provided further that, the impact of pay revision (including arrears) shall be

allowed on actual during the mid-term performance review or at the end of the

4604

jkti=] fgekpy izns'k] 4 uoEcj] 2013@13 dkfrZd 1935

control period as per audited/unaudited accounts, subject to prudence check and

any other factor considered appropriate by the Commission.”

9. Amendment of regulation 26.—In sub-regulation (7) of regulation 26 of the

said regulations, for the words “eighty paise” wherever these occur, the words “one rupee

fifteen [D1]paise” shall be substituted.

10. Amendment of regulation 33.—In regulation 33 of the said regulations, after the

words “provisions of” the words, alphabets, figures and brackets “the regulations framed by the

Central Electricity Authority (CEA) under section 177 (c) and” shall be inserted.

11. Substitution of regulation 34.—For regulation 34 of the said regulations, the

following regulation 34 shall be substituted, namely:-

“34. Safety Standards

The generating company shall develop a safety manual and comply with regulations

framed in this regard by the Central Electricity Authority (CEA) under section 53

and section 177 (2) (b) of the Act.”

12. Substitution of regulation 35.—For regulation 35 of the said regulations, the

following regulation 35 shall be substituted, namely:-

“35. Multi-Year Fillings for the control period

(1) “For the Approval of the Commission, the multi-year ARR and tariff filing for

each year of the control period consistent with the business plan, shall be done

by the petitioner generator not less than 120 days before the commencement of

the first year of the control period or such other date as may be directed by the

Commission, in such form and in such manner as may be laid down by the

Commission by an order and also as per the provisions of the Conduct of

Business Regulations.

(2) The applicant shall also submit the multi-year ARR and tariff filing in electronic

format to the Commission.”

13. Amendment of regulation 36.—In sub-regulation (1) of Regulation 36 of the said

regulations, for the figure and words “on 1st April of”, the word “during” shall be substituted.

14. Substitution of regulation 37.—For regulation 37 of the said regulations, the

following regulation 37 shall be substituted, namely:-

“ 37. Aggregate Revenue Requirement (Multi-year and MPR) and tariff filing

during the control period

(1) The generator /generating company shall file not less than 120 days before the

commencement of the first year of the control period or such other date as may

be directed by the Commission, an application for approval of multi-year

Aggregate Revenue Requirement (ARR) and determination of tariff for each

year of the control period.

4605

jkti=] fgekpy izns'k] 4 uoEcj 2013@13 dkfrZd 1935

(2) To address any mid-term changes on account of unexpected outcomes, the

Commission shall undertake mid-term performance review of generating

company’s performance for the year after the mid year of the control period;

(3) The generation company shall make a petition / application for mid-term

performance review on the controllable / uncontrollable factors not less 120

days before the commencement of the year after the mid year of the control

period as per principles laid down as follows:-

(a) In the mid-term performance review, the Commission shall make a

comparison of the actual performance and expected revenue from tariff and

charges vis-à-vis that approved in the first year of the Control period and

the generation company shall submit to the Commission all information

together with audited account statements, extracts of books of account and

such other details in such form and in such manner as may be laid down by

the Commission by an order and also as per the provisions of the Conduct

of Business Regulations. The mid-term performance review shall comprise

of the following:-

(i) true-up of previous control period;

(ii) true-up of previous years of control period for which audited accounts

are made available by the generator company;

(iii) review of ARR for the balance years of the control period in case of any

major change in uncontrollable and/ or controllable parameters;

(iv) review of generation tariff on account of modification in ARR for the

balance years of the control period.

(4) The generator/generation company shall furnish to the Commission, such

additional information, particulars and documents as the Commission may

require from time to time after such filing of revenue calculations and tariff

proposals.

(5) The generator/generation company shall publish, for the information of the

public, the contents of the application in an abridged form in such manner as

the Commission may direct and shall host the complete copy of the filing on its

website and shall also provide copies of the documents filed with the

Commission to any person at a price not exceeding normal photocopying

charges.

Provided that the during the MPR, the Commission may revise the trajectories for

various controllable parameters for the remaining period of the control period and

this shall be deemed to give consequential effect to the ARR approved in the first

year of the control period.”

15. Amendment of regulation 43.—For regulation 43 of the said regulations, the

following regulation 43 shall be substituted, namely:-

“43. Tax on Income

In view of pre tax return on equity, tax on the income streams of the generating

company shall not be recovered from the beneficiaries:

4606

jkti=] fgekpy izns'k] 4 uoEcj] 2013@13 dkfrZd 1935

Provided that the deferred tax liability, excluding Fringe Benefit Tax, for the period up

to end of previous control period, whenever it materializes, shall be recoverable

directly from the beneficiaries and the long-term customers.”

By order of the Commission

Sd/-

Secretary.

_____________

HIMACHAL PRADESH ELECTRICITY REGULATORY COMMISSION

SHIMLA

NOTIFICATION

Shimla, 1st November, 2013

No. HPERC/F(5)(3)(1)(Gen).—In exercise of the powers conferred by sub-regulation (1)

of regulation 35 and regulation 47 of the Himachal Pradesh Electricity Regulatory Commission

(Terms and Conditions for Determination of Hydro Generation Tariff) Regulations, 2011 and

regulations 8 and 10 of the Himachal Pradesh Electricity Regulatory Commission (Guidelines and

Formats for Tariff Filing) Regulations, 2005, read with section 21 of the General Clauses Act, 1897

(Act No. 10 of 1987) and all the powers enabling it in this behalf, the Himachal Pradesh Electricity

Regulatory Commission, hereby makes the following Order to revise the formats for the Multi Year

Tariff filings by the generating company for the control period starting from 1st April, 2014 and

thereafter, namely:-

ORDER

1. Short title and commencement.—This Order may be called the Himachal Pradesh

Electricity Regulatory Commission (Formats for Multi Year Tariff Filings by the Generating

Company) Order, 2013.

(2) This Order shall come into force on the date of its publication in the Rajpatra,

Himachal Pradesh.

2. Definitions.—In this order, unless the context otherwise requires,-

(a) “Act” means the Electricity Act, 2003 (Act No. 36 of 2003);

(b) “Annexure” means the annexure to this Order;

(c) “Form” means the Form annexed to this Order;

(d) “regulations” means the regulations made under the Act;

(e) the words and expressions used and not defined in this Order but defined in the

Act and the regulations framed thereunder shall have the meanings as assigned

them in the Act.

3. Forms for Multi Year Tariff Filings by the Generating Company:-

(1) The Multi Year Tariff filing by the generating company for the control period

starting from the 1st day of April, 2014 and thereafter shall be in the Forms as

given in the Annexure to this Order and hosted on hperc website www.hperc.org.

4607

jkti=] fgekpy izns'k] 4 uoEcj 2013@13 dkfrZd 1935

(2) The Forms laid down in the Annexure to this Order, with such modifications or

variations, as the circumstance of each case may require, shall be used for the

purpose mentioned therein and where no Form is laid down to cover a

contingency, Form as may be approved by the Commission shall be used.

By order of the Commission

Sd/-

Secretary.

____________

Annexure

[See Para 3(1) of Order]

Index Of Regulatory Compliance Formats For Tariff Filing By Generating Company:

A. SUMMARY FORMATS

1

S1

Annual Revenue Requirement

2

S2

Return on Equity

3

S3

Details of COD, Type of hydro station, Capacity Index, Primary energy

rate

i.

S3A

Design energy and peaking capability (month-wise)- ROR with Pondage/

Storage type new stations

ii.

S3B

Design energy and MW Continuous (month-wise)- ROR type stations

4

S4

Salient features of Hydroelectric Project

B. DETAILES FINANCIAL FORMATS

1

F1

Calculation of O&M Expenses

2

F2

Details of O&M Expenses

i.

F2A

Employee Expense

ii.

F2B

R&M Expense

iii.

F2C

A&G Expense

3

F3

Abstract of Admitted Capital Cost for the existing Projects

4

F4A

Abstract of Capital Cost Estimates and Schedule of Commissioning for

the New Projects

5

F4B

Break up of Capital cost for Hydro Power Generating Station in New

Projects

6

F4C

Break up of Capital Cost for Plant & Equipment

7

F4D

Financial Package up to COD

8

F5

Statement of Additional Capitalization after COD

9

F6

Financing of Additional Capitalization

10

F7

Details of Fixed Assets & Provision for Depreciation

11

F8A

Details of Project Specific Loans

12

F8B

Details of Foreign loans

13

F8C

Calculation of Weighted Average Rate of Actual Loans

14

F8D

Draw Down Schedule for Calculation of IDC & Financing Charges

15

F8E

Details of Allocation of corporate loans to various projects

16

F9

Details of Expenses Capitalized

17

F10

Contribution Grants & subsidies towards Capital assets

4608

jkti=] fgekpy izns'k] 4 uoEcj] 2013@13 dkfrZd 1935

18

F11

Share Capital and Reserves & Surplus

19

F12

Working Capital Requirements

20

F13

Project-wise / Scheme-wise Capital Expenditure

21

F13A

Capital Works in Progress

C. OTHER INFORMATION/ DOCUMENTS

1

Certificate of incorporation, Certificate for Commencing Business, Memorandum of

Association & Article of Association ( for new station set up by a company making tariff

application for the first time to HPERC)

2

Station-wise and Corporate AUDITED Balance Sheet (Annually) and Profit & Loss

Accounts with all the Schedules & annexure on COD of the station and for the relevant

years on Quarterly Basis

3

Copies of relevant loan agreements

4

Copies of the approval of Competent Authority for the Capital Cost and Financial

package.

5

Copies of the Equity participation agreements and necessary approval for the foreign

equity

6

Copies of the BPSA/PPA with the beneficiaries, if any

7

Detailed note giving reasons of time and cost overrun, if applicable.

8

Any other relevant information (Please specify)

HIMACHAL PRADESH ELECTRICITY REGULATORY COMMISSION

SHIMLA

NOTIFICATION

Shimla, the 1st November, 2013

No.

HPERC/F(5)(3)(1)(Trans).—WHEREAS

the

Himachal

Pradesh

Electricity

Regulatory Commission has framed the HPERC (Terms and Conditions for Determination of

Transmission Tariff) Regulations, 2011;

AND WHEREAS the Himachal Pradesh Electricity Regulatory Commission is making an

exercise to determine the tariff for transmission system of the licensees for the next control period

starting from 1st April, 2014;

NOW THEREFORE, in exercise of the powers conferred by clauses (zd), (ze) and (zf) of

sub-section (2) of section 181, read with sections 61, 62 and 86, of the Electricity Act, 2003 (36 of

2003) and all other powers enabling it in this behalf, and after previous publication, the Himachal

Pradesh Electricity Regulatory Commission makes the following amendments in the HPERC

(Terms and Conditions for Determination of Transmission Tariff) Regulations, 2011, published in

the Rajpatra, Himachal Pradesh, dated 2nd April 2011, namely:-

REGULATIONS

Short title, commencement and application.—(1) These regulations shall be called the

Himachal Pradesh Electricity Regulatory Commission (Terms and Conditions for Determination of

Transmission Tariff) (First Amendment) Regulations, 2013.

4609

jkti=] fgekpy izns'k] 4 uoEcj 2013@13 dkfrZd 1935

(2) These regulations shall come into force from the date of their publication in the

Rajpatra, Himachal Pradesh and shall be applicable for the tariff orders to be issued for the control

periods commencing with effect from 1st April, 2014 and thereafter.

1. Amendment of regulation 3.—In regulation 3 of the Himachal Pradesh Electricity

Regulatory Commission (Terms and Conditions for Determination of Transmission Tariff)

Regulations, 2011 (hereinafter called the “said regulations”) –

(a) for clause (21), the following clause (21) shall be substituted, namely:-

“(21)

“existing project” means a project declared under commercial operation from

a date prior to first year of the control period; ”,

(b) after clause (28), the following clause (28-a) shall be inserted, namely:-

“(28-a) “mid-term performance review” means the review of performance of the

transmission licensee undertaken by the Commission for the year after the

mid-year of the control period and this shall also include the true up of the

previous control period and True Up of previous years of the control period; ”

and

(c) in clause (39) for the words and figures “mainly of extra high voltage electric lines

having design voltage of above 33 kV”, the words and figures “of high and

extra high voltage electric lines having design voltage of 33 kV and above”

shall be substituted.

2. Amendment of regulation 7.— In regulation 7 of the said regulations –

(a) in sub-regulation (3) for the words “CEA/CTU/STU”, the words “CEA/CTU/

STU/Distribution Licensee(s)” shall be substituted; and

(b) for sub-regulation (4), the following sub-regulation (4) shall be substituted,

namely:-

“(4) For each year of the control period, the Commission shall watch over the

actual capital expenditure and capitalization vis-à-vis the approved capital

expenditure and capitalization schedule. In the normal course, the

Commission shall not revisit the approved capital investment plan (capital

expenditure and the capitalization schedule) during the control period and

adjustments to depreciation, interest on capital loan and return on equity on

account of variations for the actual capital expenditure incurred and

capitalization done vis-à-vis approved capital investment plan (capital

expenditure and capitalization), shall be done during the mid-term

performance review and at the time of end of control period true up.”

3. Amendment of regulation 10.—For regulation 10 of the said regulations, the

following regulation 10 shall be substituted, namely:-

“10. True Up

(1) The true up across various controllable parameters shall be conducted by the

Commission, for the previous years for which the actual/audited accounts are

4610

jkti=] fgekpy izns'k] 4 uoEcj] 2013@13 dkfrZd 1935

made available by the Transmission Licensee, at the times and as per principles

stated below:-

(a) at the times –

(i) for the previous years of the previous control period:- along with the

petition for determination of ARR cum transmission tariff for the

control period;

(ii) for the previous years of the control period and for the previous control

period:- along with the mid-term performance review during the control

period;

(iii) for the control period true up:- along with the mid-term performance

review of the next control period;

(b) as per principles –

(i) the Commission shall review actual capital investment vis-à-vis approved

capital investment;

(ii) depreciation and financing cost, which includes cost of debt including

working capital (interest), cost of equity (return) shall be trued up on the

basis of actual/audited information and prudence check by the

Commission;

(iii) any surplus and deficit on account of O&M expenses shall be to the

account of the Transmission Licensee and shall not be trued up in ARR;

and

(2) The gain or loss on account of other controllable factors, unless otherwise

specifically provided by the Commission shall be to the account of the

Transmission Licensee.

(3) Notwithstanding anything contained in these regulations, the gains or losses in the

controllable items of ARR on account of force majeure, change in law and change

in taxes and duties shall be passed on as an additional charge or rebate in ARR

over such period as may be laid down in the order of the Commission.”

4. Amendment of regulation 13.—In regulation 13 of the said regulations –

(a) immediately after the existing sub-regulation (1), the following sub-regulation

(1-a) shall be inserted, namely:-

“(1-a) O&M Norms –

(i) The transmission licensee shall propose separate trajectories of norms for

each of the components of O&M expenses viz., employee cost, R&M

expense and A&G expense;

(ii) Norms shall be defined in terms of combination of number of personnel per

long/medium term consumer, number of personnel per MW of capacity

4611

jkti=] fgekpy izns'k] 4 uoEcj 2013@13 dkfrZd 1935

handled for long/ medium term consumers or number of personnel per

transmission circuit kilometer line length and number of substations along

with annual expenses per personnel for Employee expenses, combination of

A&G expense per personnel and A&G expense per long/ medium term

consumer (or per MW of capacity handled) for A&G expenses and R&M

expense as percentage of gross fixed assets for estimation of R&M expenses;

(iii) One-time expenses such as expense due to change in accounting policy,

arrears paid due to pay commissions and interim relief etc., shall be excluded

from the norms in the trajectory;

(iv) The expenses beyond the control of the transmission licensee such as

dearness allowance, pension liabilities and terminal benefits in Employee

cost etc., shall be excluded from the norms in the trajectory;

(v) The One-time expenses and the expenses beyond the control of the

transmission licensee as per sub-regulations (iii) and (iv) above shall be

allowed by the Commission over and above normative Operation &

Maintenance Expenses after prudence check;

(vi) The norms in the trajectory shall be proposed over the control period with

due consideration to productivity improvements and commercial viability;

(vii) The norms shall be proposed at constant prices of base year and escalation

on account of inflation shall be over and above the baseline;

(viii) Based on the proposal submitted by the transmission licensee, the

Commission shall fix the norms for the said purposes which shall be taken

into account for determining the trajectories for various components of O&M

expenses for the remaining years of the control period;

(ix) Till such time the norms are fixed by the Commission, the trajectories of

various components of O&M expenses shall be submitted by the

transmission licensee and determined by the Commission on the basis of the

actual costs for the previous years in accordance with the provisions of these

regulations;”

(b) for the existing sub-regulation (3), the following sub-regulation (3) shall be

substituted, namely:-

“(3) The O&M expenses for the nth year of the control period shall be approved

based on the formula given below:-

O&Mn =

R&Mn + EMPn + A&Gn :

Where –

‘EMPn’ =

[(EMPn-1) x (1+Gn) x (CPIinflation)] + Provision(Emp) ;

‘A&Gn’ =

[(A&Gn-1) x (WPIinflation)] + Provision(A&G) ;

‘R&Mn’ =

K x (GFA n-1 ) x (WPIinflation) ;

4612

jkti=] fgekpy izns'k] 4 uoEcj] 2013@13 dkfrZd 1935

‘K’ -

is a constant (could be expressed in %). Value of K for each

year of the control period shall be determined by the

Commission in the MYT Tariff order based on licensee’s

filing, benchmarking of repair and maintenance expenses,

approved repair and maintenance expenses vis-à-vis GFA

approved by the Commission in past and any other factor

considered appropriate by the Commission;

‘CPIinflation’ – is the average increase in the Consumer Price Index (CPI) for

immediately preceding three years before the base year;

‘WPIinflation’ – is the average increase in the Wholesale Price Index (WPI) for

immediately preceding three years before the base year;

‘EMPn’ –

employee’s cost of the transmission licensee for the nth year

(employee cost for the base year would be adjusted for

provisions for expenses beyond the control of the licensee and

one time expected expenses, such as recovery/ adjustment of

terminal benefits, implication of pay revisions, arrears and

interim relief.);

‘Provision(Emp)’-Provision corresponding to clauses (iii), (iv) and (v) of

subregulation (1-a) of regulation 13, duly projected for

relevant year for expenses beyond control of the Transmission

Licensee and expected one-time expenses as specified above;

‘A&Gn’ –

administrative and general costs of the transmission licensee

for the nth year;

‘Provision(A&G)’-Cost for initiatives or other one-time expenses as proposed

by the Transmission licensee and approved by the

Commission after prudence check;”

‘R&Mn’ –

Repair and Maintenance costs of the transmission licensee for

the nth year;

‘GFAn-1’ –

Gross Fixed Asset of the transmission licensee for the n-1th

year;

‘Gn’ -

is a growth factor for the nth year. Value of Gn shall be

determined by the Commission in the MYT tariff order for

meeting the additional manpower requirement based on

licensee’s filings, benchmarking, approved cost by the

Commission in past and any other factor that the Commission

feels appropriate;

Provided that, repair and maintenance expenses determined shall be utilised

towards repair and maintenance works only;

Provided further that, the impact of pay revision (including arrears) shall be

allowed on actual during the mid-term performance review or at the end of

the control period as per actual/ audited accounts, subject to prudence check

and any other factor considered appropriate by the Commission.”

4613

jkti=] fgekpy izns'k] 4 uoEcj 2013@13 dkfrZd 1935

5. Amendment of regulation 14.—In sub-regulation (2) of the said regulations, for the

Fourth Proviso, the following Fourth Proviso shall be substituted, namely:

“Provided further that in case of the existing projects, the capital cost admitted by the

Commission prior to the start of the control period and the additional capital expenditure

projected to be incurred for the respective years of the control period, as may be admitted

by the Commission, shall form the basis for determination of tariff:”

6. Amendment of regulation 16.—For the proviso to clause (c) of sub regulation (2) of

regulation 16 of the said regulations, the following proviso be substituted, namely:--

“Provided that any expenditure on acquiring the minor items or the assets like tools and

tackles, furniture, air-conditioners, voltage stabilizers, refrigerators, coolers, fans, washing

machines, heat convectors, mattresses, carpets etc. brought after the cut-off date, shall not

be considered for additional capitalization for the purpose of determination of tariff during

the control period”

7. Amendment of regulation 19.—In regulation 19 of the said regulations –

(a) for the sub-regulation (2) and its proviso, the following sub-regulation (2) shall be

substituted namely:-

“(2) The rate of return on equity shall be computed by grossing up the base rate

with the normal tax rate as per latest available audited accounts of the

concerned transmission licensee:

Provided that in line with the provisions of the relevant Finance Acts of the

respective year, the return on equity with respect to the actual tax rate

applicable to the transmission licensee during the years of the control period

shall be trued up separately for each year during the mid-term performance

review and at the end of the control period along with the tariff petition filed

for the next control period. ”; and

(b) in illustration (ii) to sub-regulation (3), for the figures and symbol “33.22%”, the

figures and symbol “33.99%” shall be substituted.

8. Amendment of regulation 22.—In regulation 22 of the said regulations, for the words

and figure “Short Term Prime Lending Rate of the State Bank of India as on the 1st April of the

relevant year” the words and figures “Average Base Rate of State Bank of India for the last six

months prior to the filing of the MYT petition plus 350 basis points” shall be substituted.

9. Amendment of regulation 26.—In regulation 26 of the said regulations, for the words

“Short Term Prime Lending Rate of the State Bank of India” the words and figures “Base Rate of

the State Bank of India plus 350 basis points” shall be substituted.

4614

jkti=] fgekpy izns'k] 4 uoEcj] 2013@13 dkfrZd 1935

10. Substitution of regulation 30.—For regulation 30 of the said regulations, the

following regulation 30 shall be substituted, namely:-

“30. Safety Standards

The transmission licensee shall develop a safety manual and comply with

regulations framed in this regard by the Central Electricity Authority (CEA) under

section 53 and section 177 (2) (b) of the Act.”

11. Amendment of regulation 31.—at the end of the sub regulation (1) of regulation 31

of the said regulations, the following proviso be inserted, namely:-

“Provided that the Commission during the control period, through separate notification

in the Rajpatra Himachal Pradesh, may, after conducting a detailed study change the

existing transmission pricing framework in accordance with that adopted by the

Central Electricity Regulatory Commission.”

12. Amendment to regulation 37.— In regulation 37 of the said regulations,

(a) for the words and figure “The transmission licensee shall file for the

Commission’s approval, on 1st April of the year preceding the first year of the

control period or any other date as may be directed by the Commission, a business

plan approved by its board of directors. The business plan shall be for the entire

control period and shall, inter-alia, contain-”, the words “In the base year, prior to

the filing of multi-year ARR cum Tariff petition, the transmission licensee shall

file a business plan approved by its board of directors. The business plan shall be

for the entire control period and shall, inter-alia, contain -” shall be substituted;

and

(b) in sub-regulation (d) for the words “on the on the”, the words “on the” shall be

substituted.

13. Amendment of regulation 38.—For the existing sub-regulation (1) of Regulation 38

of the said regulations, the following sub-regulation (1) shall be substituted, namely:-

“(1) The transmission licensee shall file an application for approval of transmission

tariff for each year of the control period consistent with the approved business

plan, not less than 120 days before the commencement of the first year of the

control period or such other date as may be directed by the Commission.”

14. Substitution of regulation 39.—For regulation 39 of the said regulations, the

following regulation 39 shall be substituted, namely:-

“39. Mid-term Performance Review and Review at the End of the Control Period

(1) Mid-term performance review - The transmission licensee shall make an application

for mid-term Performance Review within 120 days before the commencement of the

fourth year of the Control Period i.e. FY 2017-18:-

The scope of the mid-term Performance Review shall be a comparison of the

actual performance with the approved forecast of Aggregate Revenue

4615

jkti=] fgekpy izns'k] 4 uoEcj 2013@13 dkfrZd 1935

Requirement and expected revenue from tariff and charges The transmission

licensee shall submit to the Commission all information together with audited

account statements, extracts of books of account and such other details as the

Commission may require to assess the reasons for and extent of any variation in

performance from the approved forecast. The mid-term review shall comprise of

the following:

(i) True-up of previous Control Period

(ii) A comparison of the actual/audited performance with the approved forecast for

first two financial years of the Control Period, subject to the prudence check

including pass-through of impact of uncontrollable factors;

(iii) Review of controllable parameters

(iv) Review of ARR for the balance of the control period in case of any major change

in uncontrollable and/or controllable parameters (v) Review of transmission

charges on account of modification in ARR for the balance control period.

(2) Review at the end of control period—The transmission licensee shall also make an

application for Comprehensive Review after the end of the third Control Period on

availability of audited accounts for each year of the control period. The comprehensive

review shall be based as per the principles laid down under these Regulations for

various parameters of ARR:

Provided that the transmission licensee shall submit to the Commission information in

such format as may be stipulated by the Commission, together with the audited account

statements, extracts of books of account and such other details as the Commission may

require to assess the reasons for and extent of any variation in financial performance

from the approved forecast of Aggregate Revenue Requirement and expected revenue

from tariff and charges.

(3) Towards the end of the control period, the Commission shall review if the

implementation of the principles laid down in these regulations has achieved their

intended objectives. While doing this, the Commission shall take into account, among

other things, the industry structure, sector requirements, consumer and other

stakeholder expectations and the licensee’s requirements at that point in time.

Depending on the requirements of the sector to meet the objects of the Act, the

Commission may revise the principles for the next control period.

(4) The end of the control period shall be the beginning of the next control period and the

licensee shall follow the same procedure, unless required otherwise by the

Commission. The Commission shall analyze the performance of the licensee with

4616

jkti=] fgekpy izns'k] 4 uoEcj] 2013@13 dkfrZd 1935

respect to the targets set out at the beginning of the control period and based on the

actual performance, expected efficiency improvements and other factors prevalent,

determine the initial values for the next control period.”

15. Amendment of regulation 43.—In the Proviso to existing regulation 43 of the said

regulations, the date “31st March, 2011” shall be substituted with the words “the end

of previous control period,”

By Order of the Commission

Sd/-

Secretary.

_________

fu;U=d] eqnz.k rFkk ys[ku lkexzh] fgekpy izns'k] f'keyk&5 }kjk eqfnzr rFkk izdkf'kr