Shimla-2, the 30th March, 2015
No.PBW(B)F(5)2/2011-XII-L.—The Governor, Himachal Pradesh, is pleased to order the
formulation of Himachal Pradesh Rural Roads Maintenance policy 2015 including Standard
Operating Procedure and the same is hereby notified/published for general information of all
concerned.
4&jkti=@2015&6&04&2015
¼95½
96
jkti=] fgekpy izns'k] 6 vizSy] 2015@16 pS=] 1937
The Himachal Pradesh Rural Roads Maintenance Policy 2015 including Standard Operating
Procedure will come into force with immediate effect.
By order,
NARINDER CHAUHAN,
Additional Chief Secretary (PW).
____________
Policy on Maintenance of
Policy on Maintenance of
Rural Roads in the state of
Himachal Pradesh
January, 2015
97
jkti=] fgekpy izns'k] 6 vizSy] 2015@16 pS=] 1937
Preamble
Road network plays a very important role in the hill state of Himachal Pradesh. To achieve
connectivity to the remotest villages in the State, the Government has been relentless in its effort
and after the inception of PMGSY; the State has been able to construct approximately 1000 kms of
rural roads every year, thereby contributing to a total rural roads network of about 26,000 kms.
Road connectivity has contributed to positive changes in the State like access to education
facilities, markets and improved medical facilities.
This huge asset thus created needs a huge effort to maintain the same. Inadequate maintenance of
roads is resulting in disruption of traffic, hampering economic growth and an increased
maintenance cost of vehicles. For optimum utilization of road assets timely maintenance is
essential. The principal objectives of road maintenance are to keep roads open, reduce rate of
deterioration and extend life of the road network and improve the speed and frequency of public
transport services. Maintenance for rural roads also generates local employment opportunities and
additional market prospects for the local construction industry. Maintenance of rural roads provides
an economic rate of return which is often in the range of 25 to 30 per cent.
_____________
Table 1:
The replacement value of rural roads assets in the state of Himachal Pradesh (Broad Assessment
based on as of 1st January 2014)
S No.
Category of Roads
Unit Cost
Rs. Lakh / KM
Amount (Rs.
Crore)
1
PMGSY
1)
New Connectivity 6885 kms
2)
Up gradation 2339 kms
58.00
43.00
3993
1006
2
Non PMGSY
1)
Core Road Network 15546 kms
2)
Non-Core roads 1000 kms
30.00
15.00
4664
150
Total kms 25770 kms
9813
Any inadequacy in funding and implementation on the ground will result in the erosion of
the asset base. The state is committed towards ensuring adequate funds for maintenance of the
entire rural road network within its jurisdiction. Under no circumstance shall maintenance be
regarded as a secondary issue.
The Govt. of H.P. intends to adopt a rural roads maintenance policy for the planning &
execution of maintenance of rural roads under its jurisdiction and shall be called as “Himachal
Pradesh Rural Roads Maintenance Policy 2015”.
The policy takes into consideration the Government’s commitment to funding and ensuring
transparency in its working, bidding, e-tendering, contract management and implementing rural
road maintenance as under:
98
jkti=] fgekpy izns'k] 6 vizSy] 2015@16 pS=] 1937
1.
Introduce a system of working out present asset value of the road network at the end of
financial year. Box 1 provides indicative steps for assessing the replacement value of the
network.
Box 1: Assessing Replacement Value of Rural Road Assets
1. Each PIU is directed to provide the assessment in the month of July/August (lean period of
execution) every year.
2. Standard format for inventory and condition survey shall be specified by HPPWD for
collection of data
3. Each PIU works out the replacement value of roads within its jurisdiction as per illustration given in
Table 1.
4. The replacement value of the total rural road network is put in public domain by the state
government.
2.
Constitute a state level committee to work out realistic norms for maintenance of rural roads
covering Routine, Periodic, Emergency Maintenance and Special Repairs. Box 2 major
activities of maintenance;
Box 2: Norms for Maintenance of Rural Roads
State Government shall constitute a Committee comprising technical, administrative and
finance senior level officers having technical officers not below the rank of Chief Engineer, and
grant about three month’s time to work out the norms. The committee may comprise of:
1. Principal Secretary (PW)
2. Engineer-in-Chief, HPPWD
3. Joint Finance Controller of PWD
4. Consultants/other departmental representatives
The norms should cover requirements of routine, periodic, emergency maintenance and special
repair under different terrain and domestic conditions relevant to the state.
Box 3: Major activities for incorporation in Maintenance Norms
A.
Routine Maintenance
Pothole repairs
Erosion control on shoulders, slopes
Cleaning of drains, culverts, other waterways
Bush clearing
Cleaning and repair of road signs
B.
Periodic Maintenance
Renewal of road surface
Major repairs to CD works
99
jkti=] fgekpy izns'k] 6 vizSy] 2015@16 pS=] 1937
C.
Emergency Maintenance
Reconstruction / repair of CD works damaged due to floods, earthquakes
Reconstruction / repair of road sections damaged due to washouts, floods, landslides, earthquakes
D. Special Repairs
Clearing of landslides
Repair/Reconstruction of retaining/breast walls
Repair/Reconstruction of damaged drains
Repair/Reconstruction of Road damaged due to laying of Public service utilities
3.
Overall responsibility for efficient planning management and delivery of rural road maintenance
shall be of HPPWD including coordination with other departments handling the work of rural roads.
A dedicated Planning, Budgeting and Monitoring (PBM) Unit, in the PWD Head Quarters to be
headed by a Superintending Engineer,which shall be responsible for Planning, Budgeting and
Monitoring of all maintenance works of the road network under the overall guidance of the
Engineer-in-Chief,HPPWD( Pl. refer S.O.P Chapter-2, clause 2.1.2)
4.
To ensure allocation of adequate and timely availability of funds needed for maintenance of rural
roads as per Annual Maintenance Plans, prepared by the HPPWD, a dedicated maintenance fund
shall be created on the basis of fund already created for maintenance of PMGSY roads.
5.
Govt. shall Constitute a standing Empowered Committee to decide on annual allocation of funds for
maintenance of different categories of roads with reasonable share for rural roads based on the
percentage of rural roads with respect to the total road network . The EC may comprise of Secretary
Finance ,Secretary (PW), Engineer-in-Chief ,HPPWD and other representatives/ consultants
6.
Explore avenues for mobilising of additional funds for reducing the gap between the funds required
and those made available for maintenance of rural roads. Sources for additional revenue generation
shall be as under:
a.
Additional tax on hotel industry (cess on luxury tax etc.)
b.
Additional levy on fruit exporters
c.
Additional cess on transport fuels
d.
Additional cess on transport of agriculture produce
e.
Rs. 1/- per bottle sale of liquor in the state
f.
Increase in toll rates
g.
Additional taxes on transport of minerals/industrial produce in the state.
h.
Additional levy on vehicle registration
i.
Additional levies on companies putting hoardings/advertisements by the side of roads
j.
Contribution
by
cement
producing
industry
and
hydelpower
producing
big
corporations/companies.
k.
Cess or charges imposed on road users for laying utility services like cables for phone
connectivity etc.
7.
Formulate an Action Plan for time bound removal of maintenance backlog of the rural road network
so that the network is brought to an acceptable level of service. On the basis of road condition (data
collected year 2013-14) and reports generated through Road Maintenance &Management System
100
jkti=] fgekpy izns'k] 6 vizSy] 2015@16 pS=] 1937
(RMMS), the State shall identify backlog &remove it in the period of 5 years in a phased manner
and the funds for the purpose shall be made available. See Box 4
Box 4:
Tarred Rural Roads in the state:
1. Very good and good roads:
5445 kms
2. Fair roads:
6496 kms
3. Poor & very poor:
3626 kms
Total:
15567 kms
Un-tarred Roads:
1. Very good and good roads:
391 kms
2. Fair roads:
1188 kms
3. Poor &very poor:
7877 kms
Total:
9456 kms
1. Periodic Renewal Requirement:
Considering a periodic renewal cycle of 5 years, length required to be tarred every year 15567/5=
3113 kms
Requirement of funds@ 10 lac per km = Rs. 311.30 Cr.
2. Backlog of Periodic Maintenance;
As per road condition data, length of roads in fair, poor and very poor subject to Periodic Renewal
6496+3626 = 10122 kms
Length of backlog 10122- 3113 = 7009 kms
Considering backlog to be cleared in 4 years
Kms required for renewal every year = 7009/4= 1752 kms
Funds required to clear backlog of 1752 kms
@ 10 lacs per year = 175.20Cr.
3. Requirement for Routine Maintenance :
With the yard stick rates for routine maintenance @ Rs. 57777/- per km per year for tarred road and
Rs 46077/- for un-tarred roads, funds required for routine maintenance
= 15567 X 57777+ 9456 X 46077
= 89.94 Cr.+43.57Cr.= 133.51 Cr.
Since the labour component of routine maintenance is met out of Regular (industrial &non
Industrial) workers of HPPWD, therefore, funds required are only for material component which is
approximately 30% of total requirement, therefore, funds required for material component:
133.51X30% =40.05 Cr.
101
jkti=] fgekpy izns'k] 6 vizSy] 2015@16 pS=] 1937
Total requirement of Periodic Renewal+ backlog of Periodic Renewal + Routine
Maintenance;
311.30+175.20+40.05= 526.55 Cr.
8.
HPPWD shall institute an annual performance evaluation system to inform the government about
the delivery of maintenance and condition of the rural road network as a result of funds allocated for
the purpose.
9.
HPPWD shall simplify the existing Road Maintenance &Management System (RMMS)for rural
roads to prepare Annual Maintenance Plans for each PIU based on scientific condition assessment of
the road network.
10.
Set up Special Zonal Task Forces in each PWD zone to deal with emergency situations arising due
to natural disasters headed by Zonal Chief Engineer, SE (Design) of the Zone and concerned SE of
the Circle as members
11.
The field units of HPPWD shall collect/outsource the collection of road condition data and
inventory data and capture the condition of roads through photographs/videography(having
longitude &latitude) of location and such details shall be uploaded suitably on the department
website.
12.
Some pilot works of maintenance shall be undertaken jointly by PIU of HPPWD and relevant
block/gram panchayat and steadily move towards devolving maintenance responsibility in respect of
rural roads to Panchayati Raj Institutions. Similar pilot project shall be undertaken with the
involvement of local community participation.
13.
Training shall form an integral part of Institutional strengthening of the HPPWD. For this
HPPWD shall formulate a calendar of training programmes for its technical officers at
various levels. These training programmes shall include development and dissemination of
training modules covering all aspects of road maintenance from planning to execution to
monitoring of entire maintenance activities. An in-house cadre of trainers shall be
developed for imparting training to the staff. Training modules shall be developed for
imparting both on-site as well as off-site training to field staff. Training programmes shall
also include study tours aimed at exposing officials to national/ international best practices.
14.
HPPWD shall extend support in providing outreach programmes in enhancing the training facilities
for Class C and Class D contractors in implementation of maintenance works. For this, the
contractor’s associations shall be associated to work out the details of training modules, training
providers including on-the-job exposures in close association with the road agencies. Such modules
could be in the form of booklets / hand-outs in various maintenance operations as also in audio-
visual mode.
15.
The HPPWD shall identify and pilot innovative maintenance models and technologies.
These innovations shall be in the form of piloting and adopting different models of
outsourcing maintenance works which could be in the form of Performance Based
Maintenance Contracting (PBMC), Community Contracting or a hybrid system involving
combination of PBMC and conventional Engineering, Procurement and Construction
(EPC). The thrust on innovative technologies shall be on materials that can be used in all
weather conditions, reduce time and manpower required for repairs, thereby improving
productivity. The technology shall be cost effective, easy to manage, off the shelf material
for patch / pothole repair and application with simple tools with all maintenance items being
accommodated in a small vehicle for speedy execution. Possibility of adopting new
techniques for pothole repairs such as first time permanent repairs shall also be explored.
Effort shall be on environment friendly technologies.
102
jkti=] fgekpy izns'k] 6 vizSy] 2015@16 pS=] 1937
16.
The HPPWD shall undertake road user satisfaction surveys every three years on its rural road
network and put the result on the website.
17.
Detailed guidelines for execution of maintenance policy will be finalised by Public Works
Department. The essential methods & procedures to assist in implementation of Annual
Maintenance Plans have been incorporated in these guidelines and attached as Annexure-I as
(Standard Operating Procedures for Maintenance of Rural Network IN HP). The objectives &
expectations from the maintenance work, utilization of resources, responsibilities & functions of
staff at different level, procedures for contract management, quality assurance, technical
specifications, maximum response time have been explained in these guidelines.
18.
Necessary amendments may be made in the provisions of the guidelines by the Himachal Pradesh
Public Works Department on the basis of experiences.
STANDARD OPERATING PROCEDURES
FOR
MAINTENANCE OF RURAL ROAD NETWORK
IN
HIMACHAL PRADESH
January, 2015
__________
TABLE OF CONTENTS
CHAPTER-1
INTRODUCTION
3
CHAPTER-2
STAFFING
4
CHAPTER-3
PLANNING AND DESIGN
5-8
CHAPTER-4
INSPECTION
9-14
CHAPTER-5
EXECUTION OF MAINTENANCE OPERATIONS
15-17
CHAPTER-6
MONITORING
18-21
CHAPTER-7
FINANCIAL MANAGEMENT
22-23
CHAPTER-8
CHAPTER-9
QUALITY ASSURANCE
MAINTENANCE OPERATIONS THROUGH CONTRACTS
24-26
27-28
103
jkti=] fgekpy izns'k] 6 vizSy] 2015@16 pS=] 1937
INTRODUCTION
1.1.1 Roads occupy an important position in the transportation system of Himachal Pradesh.
Road infrastructure is critical to economic growth and social development. Maintaining
these roads in serviceable condition is crucial to agricultural and industrial growth on the
one hand and affording means of access to the public.
1.1.2 The continued extension and improvement of the road network does however create new
and growing challenges in terms of an increasing maintenance burden. In order to sustain
the benefits of the investments made in building and improving roads, there is a need to
boost capacity in terms of providing adequate maintenance.
1.1.3 More emphasis needs to be placed on the maintenance of already existing infrastructure
assets. This implies that an increasing proportion of funds and managerial capacity needs to
be allocated for protecting the investments made earlier in building the road network.
1.1.4 From a technical point of view, there is no shortage of technical guidance on how the works
should be carried out. The challenge seems to be more related to how maintenance should
be organised and when it should be carried out. There is, however, a need to define
requirements at operational level which ensure that technical means are secured in order to
actually carry out the required maintenance. Therefore, it has been felt necessary to put in
place a Standard Operating Procedure for maintenance of the roads at operational level for
securing adequate and timely maintenance of the rural road network.
CHAPTER TWO
STAFFING
2.1
Organisational Setup
2.1.1 Himachal Pradesh Public Works Department shall be responsible for the operation and
maintenance of the entire road network under its jurisdiction. The administrative control of
the department shall wrest with the Secretary to the Government of Himachal Pradesh. The
Engineer- in-Chief would be overall in-charge of the department. The construction and
maintenance of the network comprising State Highways, Major District Roads and Rural
Roads shall be supervised by the Zonal Chief Engineers who have control over the field
Circles with each circle is headed by a Superintending Engineer. These circles are further
divided into field Divisions each headed by an Executive Engineer. Similarly, these field
divisions have a number of sub divisions headed by an Assistant Engineer. The Assistant
Engineers are assisted by a number of Junior Engineers each of whom is in-charge of a
section. The Junior Engineers are in turn assisted by Works Inspector/Mates etc.
2.1.2 A dedicated Planning, Budgeting and Monitoring (PBM) Unit in the PWD and headed by a
Superintending Engineer shall be responsible for Planning, Budgeting and Monitoring of all
maintenance works of the road network under the overall guidance of the Engineer-in-
Chief. This unit shall comprise of one Executive Engineer, two Assistant Engineers, two
Junior Engineers, one Draftsman and two Computer Operators. The Deputy Controller
(F&A) shall assist the Superintending Engineer of the PBM Unit in all financial matters.
2.1.3 Technical audit of sample stretches as well as the quality inspections shall be conducted by
the Quality Control wing of the PWD.
104
jkti=] fgekpy izns'k] 6 vizSy] 2015@16 pS=] 1937
CHAPTER THREE
PLANNING AND DESIGN
3.1.1 Maintenance Works will include all works of routine maintenance, periodic maintenance,
road rehabilitation including pavement strengthening, special repairs and emergency
maintenances.
3.1.2 The PBM Unit shall initiate action on maintenance activities as under:
(i) Exercise for review of Yardstick Norms for routine maintenance shall commence in
October every year and the process completed by 30th November. The norms as
finalized shall be notified by 31st December and shall be applicable for the next
financial year beginning 1st April. Even in case the norms do not require any change the
existing norms shall again be notified by this date.
(ii) Ayearly review of the rates of individual items involved in maintenance activities
shall be carried out by considering the prevailing market rates as on 1st October of that
year and the review shall be completed by 30th November. The rates so finalized shall
be notified by 31st December.
3.1.3 A Periodic Renewal cycle of 5 years shall be adopted for roads traversing altitude above
2000m (snow bound areas) and 6years for roads traversing altitudes below 2000m (non
snow bound areas)
3.1.4 The Specifications to be adopted shall be HPPWD Specifications for State works and
Ministry of Rural Development (MoRD) Specifications for PMGSY works. In case
specification for a particular item in State Works are not available MoRD specifications for
Rural Roads shall be followed and vice-versa.
3.1.5 The Field Units, namely, the Divisional Offices shall be responsible for carrying out the
Road Inventory and Road Condition Surveys as per prescribed procedures.
3.1.6 The road condition data survey at every 100 m interval shall be carried out by the Junior
Engineers in charge of the respective sections. They may take the assistance of their Work
Inspectors/Mates. Their work shall be supervised by their Assistant Engineers and
physically checked to the extent of 15% and accordingly certified.The road condition data
shall be collected through visual inspection. The Assistant Engineers (MM) posted in the
zonal offices shall simultaneously carry out 10% test check of the road condition data
collected by the field units.
The schedule for the above activities shall be as under:
(i)
The surveys shall commence immediately after the cessation of monsoons in October and
completed by 15th November
(ii)
Data from the survey shall be uploaded on the Road Maintenance Management System
(RMMS)/Road Management System (RMS) by the Divisional Offices by 1st week of
December
(iii) Results of the entire road network shall be generated by the PMGSY HQ staff by
31stDecember.
105
jkti=] fgekpy izns'k] 6 vizSy] 2015@16 pS=] 1937
3.1.8
PWD HQ shall finalize the priority list for Annual Maintenance Plan (AMP) and disseminate the
same to all field offices by the 15th January. The field Executive Engineers on receipt of the
approved AMP shall have another verification carried out to confirm that the roads appearing in the
AMP with respect to their jurisdiction actually qualify for Periodic Renewal and revert back to the
HQ by 31st January with full justification in case any substitution is required. Annual Maintenance
calendar shall be hoisted on departmental website by March.
3.1.9
Field offices shall initiate action for preparing estimates and inviting bids for works proposed to be
contracted out for the approved chain ages of various roads immediately and works shall be awarded
by 25thMarch.
3.1.10 Implementation shall commence by 10thApril except for the tribal areas where the working season
normally starts in May end/June.
3.1.11 The Annual Calendar of Road Maintenance Activities shall be as given in Table 1
Table 1
ANNUAL CALENDER OF ROAD MAINTENANCE ACTIVITIES
Sr.
No.
Item of Work
Intervention
Standard
Response
Time
Frequency
Remarks
1
2
3
4
5
6
1.
Cleaning/desilting of road side drain/gutter
Thrice
i) February
ii) May and June
iii) August
and
September and as
and when required
i.e. blockade more
than one-fourth
Water diverted out of
drain onto roadway
Causing
a
hazard
to
traffic
Immediate
Obstruction or Siltation
impeding flow
Blocked
by
more
than
one-fourth of
the size of the
drain
14 days and
prior
to
monsoon
2.
Pothole Filling
Collection
of
patch
repair
material
for
Bituminous roads
i) January
and
February
ii) July
and
September
Collection
of
patch
repair
material
for
WBM repair
i) January
and
February
ii) July & August
Pothole
filling
in
Bituminous and rigid
pavement
with
maximum
dimension
more
than
200mm,
cracks,
edge
breaks,
ruts and depressions
All potholes
≤75mm depth
Cracks
>5mm
in
width
Edge Breaks
>150mm
in
width
Ruts >50mm
in depth
Depressions
>50mm
in
depth
21 days
Immediate on their
occurrence
106
jkti=] fgekpy izns'k] 6 vizSy] 2015@16 pS=] 1937
Pothole filling in WBM
with
maximum
dimension >200mm
Depth
>
75mm
21 days
Pothole
filling
in
Gravel/ Katcha surface
Depth
>50mm
Width
>300mm
45 days
3.
Filling
edges
of
bituminous
surfaces
and
replenishing/
lowering
earthen/
hard shoulders
Difference
more than (-)
50mm/
(+)
0mm
Before
and
after
monsoons and as and
when required i. e.
when the require-
ments as specified
are exceeded as per
Col. 3
4.
Dressing of berms
Before
and
after
monsoon and once in
between
i.e.
February/
March,
June,
August
and
September
5.
Restoration
of
rain
cuts and side slopes
September and as
and when required
6.
Cleaning
of
Cross-
Drainages
Debris and silt reducing
effectiveness
of
structure,
broken
or
cracked
structure
causing
instability,
under mining or not
functioning properly
Blocked
by
more
than
one-fourth of
the size of the
culvert
opening
14 days
Twice
(May
and
October) and as and
when required i.e.
blockade more than
one-fourth
of
the
opening
Deformation of culvert,
its invert and alignment
45 days and
prior
to
monsoon
7.
While
washing
of
Parapets,
Guide
Stones, Tree Trunks
etc.
Twice
(April
and
October)
8.
Re-fixing
disturbed
caution boards, other
signage etc.
Once and as and
when required
9.
Re-fixing
displaced
Km.
stones,
200m
stones, guard stones,
guard rails
Once and as and
when required
10.
Cutting of branches of
trees, pruning shrubs
Once (October)
11.
Removing
wild
seasonal growth on
berms and from road
side structures
Twice (March and
September)
107
jkti=] fgekpy izns'k] 6 vizSy] 2015@16 pS=] 1937
12.
Painting
of
Km.
stones, Numbering of
culverts,
Road
markings
etc.
including history of
road on Km. stones
Once
(April/
November)
13.
Maintenance of T & P
All round the year
14.
Removal
of
encroachment
All round the year
3.1.12 The Superintending Engineers in charge of field circles shall closely monitor the progress of the
above activities in respect of their jurisdictions.
3.1.13 The Junior Engineer shall prepare monthly Maintenance Plan of the roads and forward it to the
Assistant Engineer one week before the commencement of the respective month for approval
3.1.14 In case of Divisions having labour in excess of the norms the Executive Engineer shall, in
consultation with the Superintending Engineer, prepare a list of works such as construction of side
drains, culverts, parapets, retaining/breast walls etc. that could be entrusted to such surplus labour.
The quantum of works thus identified should be commensurate with the prescribed norms for tasks
for labour. This list shall be prepared and finalized within the first three months of the calendar year
so that these works are taken up from the start of the next financial year.
_____________
CHAPTER FOUR
INSPECTION
4.1
Duties
4.1.1
Attention of all officers/officials of the Department is drawn to the imperative necessity for the
maintenance of the roads under their jurisdiction. In order to maintain the roads efficiently and
economically, officers/officials in-charge of the roads must exercise the greatest care to see that
money and materials are used with caution and financial prudence. To achieve this, frequent
inspections are necessary and in this connection the following broad principles are laid down:
(i)
The Mate/Work Inspector shall keep a strict watch on the condition of the entire stretch of road
under his beat and cover the same daily.
(ii)
The Junior Engineer incharge shall inspect the entire road length under his jurisdiction at least
once every week. He shall simultaneously verify at site the contents of the Daily Progress
Report as maintained by the Mate/Work Inspector in his dairy and initial the same
(iii)
The Assistant Engineer incharge of the road shall ordinarily travel at the rate of 30 Km. per
day and inspect the entire length under his jurisdiction at least once every month. He shall
invariably be accompanied by the Junior Engineer incharge to whom he can give the necessary
directions for repairs.
(iv)
The Executive Engineer shall also arrange to travel only moderate distance each day and shall
be accompanied by the Assistant Engineer incharge. He shall inspect all the roads under his
jurisdiction once every three months.
(v)
The Superintending Engineer shall, whenever possible, be accompanied by the Executive
Engineer. He shall plan his visit through alternate routes rather than following only the regular
108
jkti=] fgekpy izns'k] 6 vizSy] 2015@16 pS=] 1937
and direct route while proceeding/coming back from tour. This is necessary to ensure that
alternate routes/interior roads get inspected even when the purpose/destination for the tour may
be different. It may, therefore, be ensured that the officer does not undertake to and fro journey
through the same route. He shall travel on alternate route on one or another journey.
(vi)
Every effort should be made to issue instructions verbally and with personnel consultation
supplemented by notes in the notebook of the person to whom orders are given. This procedure
will save time in writing long inspection notes.
(vii)
Superintending Engineer should be able to supplement the notes given in the notebooks with
more precise orders.
(viii)
From the point of view of safety of traffic, as well as from the point of view of safety of road
structures, it is essential to pay special attention to the maintenance of road berms. The
Inspecting officers should make special note of the condition of the berms and their
improvement since the last inspection and record the same in the notebook of the Junior
Engineer and the Assistant Engineers.
(ix)
The Superintending Engineer shall also inspect the roads from overall road safety
considerations and give appropriate directions
4.1.2 Duties of Mate
(i)
To report to Work Inspector/ Junior Engineer.
(ii)
To mark daily attendance of labour working under him.
(iii)
To help in the layout, marking, checking the quality and quantity of work done by the labour
and get the work executed as per instructions.
(iv)
To assist the Work Inspector/Junior Engineer in taking out the measurement for daily work
done by labour.
(v)
To display necessary caution boards for safety point of view as per standard layout.
(vi)
To report to his senior about any causality, accident, encroachment of Government property or
any type of serious damage to the Government property within his beat.
(vii)
To maintain T & P and sign boards under his charge.
(viii)
To carry out jobs of semi-skilled nature connected with his trade alongwith his gang.
(ix)
General supervision over un-skilled labour.
(x)
To get cement/composite mortar prepared in his presence as per instructions of Junior
Engineer/Work Inspector.
(xi)
To report about damages to structures, kilometer stone etc. and keeping them in position.
(xii)
To comply with any instruction given by his immediate superior.
(xiii)
Daily labour report, D.L.R.
(xiv)
To ensure adequate quantum of work being done by gang and that it conforms to norms.
(xv)
To keep account of permanent articles, for example direction boards, trees, drums etc. in his
beat.
109
jkti=] fgekpy izns'k] 6 vizSy] 2015@16 pS=] 1937
(xvi)
To ensure providing and proper upkeep of diversions.
4.1.3 Duties of Work Inspector
(i)
To report to Junior Engineer.
(ii)
To maintain daily diary of the work done and to put up to the Section Incharge every alternate
day.
(iii)
To maintain daily receipt/daily consumption of material consumed.
(iv)
To help in preparing estimates for minor works and repairs.
(v)
To ensure execution of work according to specifications and drawings.
(vi)
To take round of various bridges and roads under his charge on regular basis and report to
section incharge about repairs to be done. He shall also assist to plan out a programme for such
repairs in advance and ensure their execution through the department labour within the
specified period.
(vii)
To assist Junior Engineer in taking out measurement and distributing work to labour daily and
checking their attendance.
(viii)
To estimate and indicate rough quantities of materials required
(ix)
To take measurement of daily work done.
(x)
To ensure adequate quantum of work being done by gang and that it conform to norms
(xi)
To maintain material at site account and account of traffic signs.
(xii)
To report about unauthorized constructions and encroachments on government premises.
(xiii)
To comply with the instructions given to him by his immediate officer.
(xiv)
To ensure submission of daily report.
(xv)
To see that log books are filled daily for machinery and that machinery are parked properly.
(xvi)
To maintain details of land width and check encroachments.
(xvii) To ensure proper maintenance of speed humps and caution boards Including their painting.
4.1.4 Duties of Junior Engineers
(i)
Inspection and supervision of works as per prescribed norms.
(ii)
Recording the progress of both casual and regular labour in the Measurement Book (MB) and
ensuring that the output of labour matches with the norms for task for labour.
(iii)
No progress in MB be entered as ‘unsusceptible to measurement’ and progress of all activities
be recorded.
(iv)
Reporting observations to higher authorities.
(v)
Preparing estimates for repairs after conducting condition survey of roads.
110
jkti=] fgekpy izns'k] 6 vizSy] 2015@16 pS=] 1937
(vi)
Reporting about closure of road/obstructions due to any of the following reasons;
(a) Over toping/breach;
(b) Landslides;
(c) Earth quakes;
(d) Accident;
(e) Any other reason (specify);
(vi)
Arranging for removal of obstructions such as dead animals, trees and other debris
lying on road.
(vii)
Enumerating safety measures and restoration works in case of flood damages and breaches and
reports on opening of traffic/completion of restoration.
4.1.5 Duties of Assistant Engineers
(i)
Inspection and supervision of works as per norms.
(ii)
Reporting observations which suggestion for remedial action to higher authorities.
(iii)
Getting estimate prepared and checked after conducting surveys and site investigations.
(iv)
Reporting about heavy rain fall in the area and consequent rain damage.
(v)
Enumerating action on the report of Engineering subordinates regarding obstructions,
accidents etc.
(vi)
Enumerating safety measures and restoration of (both temporary and permanent) works in case
of flood damages and breaches.
4.1.6 Duties of Executive Engineers
(i)
Inspection and recording of observations as per prescribed norms.
(ii) Planning and finalization of nature of maintenance activities e.g. surface repair, prepare to CD
works etc.
(iii) Arranging men, materials and machinery in advance as per requirements.
(iv) Finalizing action on reports of Assistant Engineers and also on safety measures, diversion in
case of breaches and flood damages.
(v) Coordination with various agencies like Traffic Police, Local Administration, Publicity Media
etc., in case of emergent repair, interruption to traffic by road blockage, etc.
(vi) Initiate steps for finalizing permanent restoration works.
4.2 Action to be taken in case the road is Breached or Blocked
4.2.1 Action to be taken by the Mate/Work Inspector
(a) Immediate report of the road breach/blocked will be made to Junior Engineer and Assistant
Engineer. The following points will be included in the reports:
(i)
Name of the road
111
jkti=] fgekpy izns'k] 6 vizSy] 2015@16 pS=] 1937
(ii) Location of the breach/blockade
(iii) Length and nature of the breach/blockade
(iv) Date and time of occurrence
(v) Assessment of the assistance in the form of men and material required
(b) “Road closed” boards and “Diversions” boards shall be fixed on both sides at 60 m distance in
advance of the hazard
(c) Arrangements for red lights to be done in case of darkness
(d) Labour shall be deputed to guide the traffic to prevent any accident
(e) Construction of diversion, if possible
4.2.2 Action to be taken by the Junior Engineer
(a) He will at once visit the site of the hazard and shall ensure that:
(i)
Road has been closed by means of barricading with empty drums or any other means
available at site
(ii) That caution and diversion boards have been fixed on both sides
(iii) Arrangements made to guide the traffic by posting gang men having red flags
(iv) Arrangements made for red lights and chowkidar etc.
(v)
Steps to stop further damage to the road are taken as per site requirement
(vi) Possibilities of construction of diversion to be explored. If possible the diversion should
be constructed with available resources
(b) He shall immediately report to the Assistant Engineer, Executive Engineer and Superintending
Engineer through fax regarding the road breach, duration of blockade of the traffic followed by
a detailed report containing:
(i)
Name of the road
(ii) Location of the breach/blockade
(iii) Length and average depth of the breach
(iv) Date and time of occurrence
(v) Duration of suspension of traffic
(vi) Requirement of men and material for restoration of traffic and road and the approximate
cost
(c) All arrangements and efforts shall be made for restoration of traffic
(d) He will intimate the details of any losses and injuries to the public, if any, including the extent
of compensation if payable
112
jkti=] fgekpy izns'k] 6 vizSy] 2015@16 pS=] 1937
4.2.3 Action to be taken by the Assistant Engineer
(a) He shall at once inspect the site of the hazard
(b) He shall inspect all safety measures taken by the Junior Engineer
(c) He shall ensure that the restoration of traffic is done at the earliest
(d) He shall send a detailed report regarding the breach/blockade enumerating all the points given
under 2 (b) above. In addition to these he will also include the following points:
(i)
The causes of the breach/blockade
(ii)
Forecast estimate for restoration of traffic and road
(iii) Remedial measures to avoid any future occurrence with forecast estimates
(iv) Any other information which he wants to include
4.2.4 Action to be taken by the Executive Engineer
(a) He shall at once visit the site of breach. In case of multiple occurrences, he will inspect them in
order of priority and importance
(b) He shall ensure speedy restoration of traffic
(c) He shall send a detailed report to the Superintending Engineer and Chief Engineer about the
road damage indicating:
(i)
Nature and cause of damage with location
(ii)
Proposals for remedial measures with financial implications
(iii) Nature and course of consequential damages to public properties etc.
(iv) Action taken for restoration of traffic and restoration of damages with financial
implications
(d) He shall be fully responsible for all the action taken for the protection and safety of traffic and
road
__________
CHAPTER FIVE
EXECUTION OF MAINTENANCE OPERATIONS
5.1
Safety of Workers and Road Users During Maintenance
(I)
In the implementation of maintenance operations, the road user and personnel involved in the work
shall not be exposed to hazards. Besides, delay and inconvenience to the traffic should be reduced to
the minimum.
(II)
Traffic hazard and inconvenience be minimized by use of temporary road signs and
controlling/guiding of the traffic.
(III)
Maintenance operations should at a time be confined to small lengths say 30m in half the pavement
width, leaving the other half for use by traffic.
113
jkti=] fgekpy izns'k] 6 vizSy] 2015@16 pS=] 1937
5.2
Output of labour
(I)
There should be no ambiguity regarding duties assigned to the supervisory staff so that there is full
coordination while identifying jobs and giving direction to the labour. In this connection, the duties
of Mates/Work Inspector have been spelt out elsewhere in this document.
(II)
The gang men must fully know the tasks they are to carryout and the expected output.
(III)
There should be regular checking whether the task assigned and output achieved are as per norms.
(IV)
All works (no work to be recorded as unsusceptible to measurements) executed by the labour both
casual and regular shall be measured and entered in the Measurement Book (MB) and if the progress
is less than the norms then proportionate recovery shall be made or the wages shall be reduced
accordingly by the Assistant Engineer responsible for making payment.
(V)
The recommended tasks for labour are given as under:
Table-2
Sr.
No.
Task
Norms
1.
Earth work such as in berms, de-silting of drains etc.
(a) Ordinary soil
2.5 Cum/person/day
(b) Hard soil
1.75 Cum/person/day
2.
Dressing of berms
75Sqm/person/day
3.
Jungle clearance
100Sqm/Person/Day
4.
Patching with premix carpet
0.75 Cum/Person/Day
5.
WBM patching
0.30 Cum/Person/Day
6.
Blinding of WBM surface
150Sqm/Person/Day
7.
Edge covering
60 m/Person/Day
8.
Side slope/shoulder repair
2.0 Cum/Person/Day
9.
Maintenance of drains
125 RM/Person/Day
10.
White washing of parapets, tree trunks, breast walls etc.
30Sqm/Person/Day
11.
Other items as per norms worked out from Schedule of Rates
(SOR)
Note: The quantity mentioned is that of grit and blast used for patch repairs.
(VI)
For the purpose of monitoring the progress of these works the Mate/Work Inspector incharge in that
section shall be accountable. The Junior Engineer will exercise 100% test check in each work and
Assistant Engineer/Executive Engineer respectively upto 30 and 10%.
(VII)
Instead of deploying labour in a scattered manner, deployment shall be made in gang who will take
up work from one and move progressively towards the other ends.
(VIII) In order to ensure continuous maintenance of roads and availability of some labour even on Sundays
to attend to any emergent job, it shall be expedient to stagger week-end holidays to them, whereas
casual daily wage workers shall be allowed weekly rest on Sundays and Work Charged/regular
labour shall be given weekly holiday on Mondays.
5.3
Material Procurement
(I)
Material used for maintenance of paved roads is bitumen/emulsion and aggregate
(II)
Bitumen/emulsion shall be procured and stored centrally along with cement required for other
repairs
114
jkti=] fgekpy izns'k] 6 vizSy] 2015@16 pS=] 1937
(III)
Aggregate and sand shall be collected at site of work as per requirement
(IV)
The procurement of above materials shall be made as per the Annual Calendar of Road Maintenance
Activities shown elsewhere in this document
5.4
Mechanical Equipment
(I)
Arrangement for mechanical equipment such as road roller, Mini Hot Mix Plant, if proposed, to be
deployed shall be made well in time keeping in view the Annual Calendar of Road Maintenance
Activities
5.5
Tools and Plants
(I)
The requirements of tools and plants in good condition for one gang for 20 Km. beat having 5 Gang
men and one Mate shall normally be as shown in Table-3:
Table-3
Sr.
No.
Item
Essential Quantity
(With Gangs) (Nos.)
Option with J.E.
incharge (Nos.)
1.
Spades
3
2.
Pan (parat)
3
3.
Pick Axes
2
4.
Axe
1
5.
Wheel barrow
3
6.
Tar Sprinklers (Jharnas)
1
7.
Tar Buckets
1
8.
Tar boiler (mini)
1
9.
Brushes
(a) Wire
5
(b) Coir
5
(c) Hair
5
10.
Hammer
1
11.
Rope
12 mm
1
6mm
1
12.
Cross Slope Template for berms
(camber 3 percent)
1
13.
Tar thermometer
4
14.
Spring Balance
1
15.
Tape 15 mtr.
1
16.
Measuring wooden boxes (35cm x
25cm x 40cm)
2
17.
G.I. Bucket
1
18.
Straight edge
1
19.
Caution board
2
115
jkti=] fgekpy izns'k] 6 vizSy] 2015@16 pS=] 1937
CHAPTER SIX
MONITORING
6.1.1
In order to ensure the desired progress in terms of physical and financial targets, it is essential to
keep a close watch through monitoring of returns as well as through online monitoring.
6.1.2
Superintending Engineer in charge of field circle shall ensure that there is proper monitoring of all
maintenance activities. He shall monitor the physical and financial performance through quarterly
returns to be submitted to him by the Executive Engineers in the format as per Table-4 (Routine
Maintenance), Table-5 (Periodic Renewal) and Table-6 (Special Repairs/Flood Damage Repairs) by
the 15th day of the calendar month immediately succeeding the quarter under report:
Table-4
Financial Progress of Routine Maintenance
Name of Division:
Name of Sub- Division:
Name of
road
Length
of road
(km)
Budget
Allotment
(Rs. Lacs)
Routine Maintenance
(All in Rs. Lacs)
Remarks
Expenditure
up to last
Quarter
Expenditure
during
the
Quarter
under review
Cumulative
Expenditure
during
the
year
Note: The Executive Engineer shall certify that financial figures given are as per the Register of
Works (CPWA-41) corresponding to Works Abstract (CPWA-34)
Table-5
Physical and Financial Progress of Periodic Maintenance
Name of Division: -
Name of Sub-Division: -
Name
of
Road
Job
No.
Sanctioned
Length
(in Km.)
Sanc-
tioned
Amount
(Rs.
Lacs.)
Achievement upto last
Financial Year
Target for current
Financial Year
Achievement during the
year upto last quarter
Achievement during the
quarter
Physical
(in Km.)
Financial
(Rs. Lacs)
Physical
(in Km.)
Fina-
ncial
(Rs.
Lacs)
Physical
(in Km.)
Financial
(Rs. Lacs)
Physical
(in Km.)
Financial
(Rs. Lacs)
1
2
3
4
5
6
7
8
9
10
11
12
116
jkti=] fgekpy izns'k] 6 vizSy] 2015@16 pS=] 1937
Cumulative Achievement during the year
Overall upto date Achievement
Likely date of
Completion
Remarks
Physical
(in Km.)
Financial
(in
Rs.
Lacs)
Physical
(in Km.)
Financial (in Rs.
Lacs)
13
14
15
16
17
18
Note: The Executive Engineer shall certify that financial figures given are as per the Register of
Works (CPWA-41) corresponding to Works Abstract (CPWA-34)
Table-6
Physical and Financial Progress of Special Repairs/Flood Damage Repairs
Name of Division: -
Name of Sub-Division: -
Name
of
Road
Job
No.
Type of
Repair
Sanc-
tioned
Amount
(Rs.
Lacs.)
Achievement upto last
Financial Year
Target for current
Financial Year
Achievement
during
the
year
upto
last
quarter
Achievement during the
quarter
Physical
(Km./%age/
No.)
Financial
(Rs. Lacs)
Physical
(Km./%age/
No.)
Financial
(Rs.
Lacs)
Physical
(Km./
%age/
No.)
Finan-
cial (Rs.
Lacs)
Physical
(Km./
%age/
No.)
Financial
(Rs.
Lacs)
1
2
3
4
5
6
7
8
9
10
11
12
Cumulative Achievement during the
year
Overall upto date Achievement
Likely date of
Completion
Remarks
Physical
(Km./%age/ No.)
Financial (in Rs.
Lacs)
Physical
(Km./%age/
No.)
Financial (in Rs.
Lacs)
13
14
15
16
17
18
Note: The Executive Engineer shall certify that financial figures given are as per the Register of
Works (CPWA-41) corresponding to Works abstract (CPWA-34)
6.1.3
The Superintending Engineer shall hold review meeting with the Divisional and Sub-Divisional
officers before the 25th day of the calendar month immediately succeeding the quarter under report
and send his report to the Zonal Chief Engineer and PWD Head Quarters by the 30th day of the
same month.
6.1.4
The Zonal Chief Engineer shall review the same and the comments of the Zonal office shall be
communicated to the Superintending Engineers and the Executive Engineer by the 15th day of next
month
6.1.5
The Planning, Budgeting and Monitoring (PBM) Cell shall review the same and the comments of
the head Quarter shall be communicated to the Superintending Engineers and the Executive
Engineer by the 20th day of next month.
117
jkti=] fgekpy izns'k] 6 vizSy] 2015@16 pS=] 1937
6.1.6
At Division level the Executive Engineers will review the physical and financial progress on the
above analogy on a monthly basis and hold a review meeting with the Assistant Engineer by the
12thday of each succeeding month.
_______________
CHAPTER SEVEN
FINANCIAL MANAGEMENT
7.1.1
The rules for keeping and rendering accounts and dealing with financial transactions made in respect
of works under State Head shall be as per Public Works Accounts Code.
7.1.2
The Executive Engineer shall maintain cash books in respect of all financial transactions.
7.1.3
All financial transactions made during the month shall be posted monthly in the Register of Works
from Works Abstract.
7.1.4
Before submission of the monthly account to the Accountant General’s office the Register of Works
(CPWA 41) shall be completed, reviewed by the Executive Engineer and date initialed by him in
token of his having examined the entries and found to be correct.
7.1.5
The Register of Works shall serve as authentic record of expenditure being made every month and
finally the yearly expenditure of maintenance incurred on each road as this Register is to be
maintained with a separate page devoted to each road.
7.1.6
Works executed under the PMGSY programme would in addition to above, be governed by the
PMGSY Accounts Manual of Maintenance Fund, by opening a separate Bank account for the
Maintenance Fund as per the provisions of this manual.
7.1.7
The payments of bills on account of maintenance of PMGSY roads shall be made out of funds
provided to HPGSDA for the maintenance of these roads.
7.1.8
No payment of maintenance of PMGSY roads shall be made from State Funds,
7.1.9
The demand for funds/Bank Authorization shall be made for routine maintenance and periodic
maintenance on separate requisition forms devised by SRRDA for these maintenance activities,
7.1.10 The accounting shall be maintained through ledgers maintained at Circles level which stand
designated as Accounting Centers in addition to Division level Accounting Centers at four Tribal
Divisions, namely, Kalpa, Kaza, Karchham and Udaipur. The Superintending Engineers and
Executive Engineer of these Accounting Centers are authorized signatories for drawl and
disbursement of money. All authorized signatories operate on the single bank account opened for
Maintenance Fund.
7.1.11 Ledgers shall also be maintained in the SRRDA to keep a watch on the expenditure.
7.1.12 The funds shall be released to these accounting centres by the SRRDA through the system of Bank
Authorization.
7.1.13 Year wise, Phase wise and Package wise ledger accounts shall be maintained for accounting of
periodic maintenance separately for PMGSY (Regular) and World Bank funded Projects.
7.1.14 The funds shall be demanded by the Divisions on the basis of actual bills.
7.1.15 Monthly accounts shall be rendered by accounting centers to SRRDA by the 5th of the following
monthfor their scrutiny and compilation on monthly basis.
118
jkti=] fgekpy izns'k] 6 vizSy] 2015@16 pS=] 1937
7.1.16 Funds received for renewal and routine maintenance shall be shown separately in the monthly
accounts.
7.1.17 The Year wise, Phase wise and Package wise schedule of expenditure shall be prepared separately
for periodic renewal and routine maintenance.
7.1.18 In case of maintenance work carried out through departmental labour, the Executive Engineer shall
demand Bank Authorization for material payment and separate cheque shall be issued by the
Superintending Engineer/ Executive Engineer authorized for issuing cheques to the concerned
Executive Engineer for accounting purpose in their accounts under appropriate heads.
________________
CHAPTER EIGHT
QUALITY ASSURANCE
8.1.1
The Quality Assurance activity, in order to be truly effective has to ensure a progressively improved
and uniform quality of the finished work. Maintenance of quality has to be imbibed in the minds of
the contractor as well as the officials of the department.
8.1.2
The direct responsibility for ensuring proper quality of work as per approved specifications for
achieving the intended performance rests with the field team of Executive Engineer, Assistant
Engineer and Junior Engineer. The Superintending Engineer shall be overall responsible for
management of Quality System and Procedures for the works under his charge.
8.2
Responsibilities of the field staff
8.2.1
The broad responsibility of the staff and the Engineer-in-charge will be as under:—
(i)
To ensure that materials duly approved by the competent authority are used in the work.
(ii) Wherever necessary the Executive Engineer shall approve the sources for respective materials.
(iii) Samples of materials shall be approved by the Executive Engineer.
(iv) To ensure that all the mandatory field and laboratory tests as laid down in the specifications are
carried out at appropriate time and materials failing to conform to the required specifications
are promptly rejected and removed from site.
(v) As far as practicable all tests on materials shall be carried out at the construction site in a
field/Divisional laboratory, which shall be set up under the control of the Executive Engineer.
A Junior Engineer of the Division with aptitude for testing shall be selected by the Executive
Engineer for manning the laboratory. He shall be given training in the Central Laboratory to
familiarize with the various tests, and then placed in charge of the field laboratory.
(vi) It will be incumbent upon the Executive Engineer to keep a watch over regular testing of
materials before making payment at the stage of each running bill.
(vii) Samples for tests shall be taken mostly by the Junior Engineer, or some by the Assistant
Engineers. Samples for 10% of mandatory tests shall be collected by the Executive Engineer.
10% of the field tests shall be got done by the Executive Engineer in his presence.
(viii) A guard file shall be maintained at all work sites, with copies of all inspection reports to-date.
119
jkti=] fgekpy izns'k] 6 vizSy] 2015@16 pS=] 1937
(ix) Inspection Register, Site Order Book, Record of tests, Hindrance Register, etc. shall be put up
for entries and review to every inspecting officer.
(x) The inspecting officers of the rank of Superintending Engineer and above shall not confine
themselves only to review of progress, co-ordination and general matters, but shall also inspect
the work from quality Assurance aspects.
(xi) The Executive Engineer and Superintending Engineer shall invariably review and sign the
guard file of earlier inspections, Inspection Register, Site Order Book, Register of tests carried
out, Hindrance Register etc.
(xii) The Executive Engineer shall ensure that the Assistant Engineers and Junior Engineers, as well
as the contractors’ supervisors in-charge are fully aware of the specifications and method of
execution of any new/fresh item of work to be taken up in the next 2 weeks. The Assistant
Engineer/Junior Engineer/ Supervisor shall ensure that this important aspect is not overlooked.
8.3
Quality Assurance set up at Circle Level
8.3.1
The Quality Assurance team with the Superintending Engineer of the Circle as its head will
comprise the Assistant Engineer (alongwith his Junior Engineer for laboratory work), whose main
job is quality assurance. In order that the role of the Assistant Engineer (QA) is effective in the
process of Quality Assurance, the following points are essential:
(i)
The periodicity of visit of works should be such that the process control at various stages is
possible.
(ii) There should be minimum delay between inspection of work and communication of inspection
report to the field formation.
(iii) The Assistant Engineer (QA) shall carry out his tasks in a manner that relates operationally to
the quality specifications and standards laid down for the work, and to the control actions that
can be applied to the construction process. Thus the Assistant Engineer (QA) should assess
those aspects which are important to the overall quality of the finished work.
8.3.2
The functions of the Quality Assurance team at Circle level are to check the compliance of Quality
Assurance system by the field units and to guide the field engineers in quality related aspects of the
work. For this purpose:
(i)
The Assistant Engineer (QA) shall carry out a minimum of 4 visits to works every month.
(ii) The Assistant Engineer (QA) shall prepare his program and seek approval of the
Superintending Engineer. The program shall be sent to site in advance of inspection.
8.3.3
Such inspections by the QA team shall, however, not absolve the responsibility of the Junior
Engineer/Assistant Engineer/Executive Engineer for accepting only quality work from the
contractor.
8.3.4
On the basis of his observations with regard to the quality of works, general adherence to the quality
assurance procedures and the standard of progress, the Assistant Engineer (QA) shall submit an
overall assessment report to the Superintending Engineer of the Circle. The Superintending
Engineer shall comment on the report with minimum delay. The Assistant Engineer (QA) will then
send the report to the Executive Engineer concerned for compliance.
8.4
Quality Assurance set up at Zonal Level
8.4.1
Quality Assurance in Zones shall be looked after by the Zonal Quality Assurance (QA) unit headed
by the Superintending Engineer (Design).
120
jkti=] fgekpy izns'k] 6 vizSy] 2015@16 pS=] 1937
8.4.2
The Zonal QA unit shall follow the guidelines and norms relating to quality systems and procedures
as laid down by the Engineer-in-Chief/Chief Engineer (QC) from time to time. These Zonal QA
units shall function under the control of Zonal Chief Engineer who shall be fully responsible for
effective quality assurance in his Zone.
8.5
Chief Engineer (QC) set up
8.5.1
The Chief Engineer (QC) shall have the overall responsibility of constantly reviewing the existing
quality assurance procedures and updating them on the basis of feedback from the Quality
Assurance teams.
8.5.2
His unit shall carry out the functions of Zones (QA) teams for works where no Superintending
Engineer (QA) is posted.
8.5.3
Carry out investigations and enquiries with regard to quality related aspects for specific works.
_______________
CHAPTER NINE
Maintenance Operations through Contracts
9.1
EPC (Engineering, Procurement and Construction) contracts
The Standard Operating Procedures as outlined in the previous chapters shall be applicable
for maintenance of the rural road network in situations where maintenance works are outsourced
through EPC (Engineering, Procurement and Construction) contracts.
9.2
Performance Based Maintenance Contracts
9.2.1 The contractor shall follow the Annual Calendar of Routine Maintenance activities as per
Para 3.1.11 unless a different calendar to be adopted has been specified in the Contract
document.
9.2.2 The inspections to be conducted by the contractor or by his authorized representative shall
ensure that the Intervention Period for undertaking maintenance measures to control defects
for adherence to the Performance Criteria for Defects shall be strictly observed as per the
Contract Agreement.
9.2.3 Junior Engineer/Assistant Engineer shall immediately report the closure of road/obstruction
due to any of the following reasons
(a) Over topping/breach
(b) Land slides
(c) Earth quakes
(d) Accident
121
jkti=] fgekpy izns'k] 6 vizSy] 2015@16 pS=] 1937
(e) Any other reason such as dead animals, trees etc.
9.2.4 In case road is breached or blocked the contractor shall take following action
(a) Immediate report of the road breach/blocked will be made to Junior Engineer/Assistant
Engineer. The following points will be included in the reports:
(i)
Name of the road
(ii) Location of the breach/blockade
(iii) Length and nature of the breach/blockade
(iv) Date and time of occurrence
(v) Assessment of the assistance in the form of men and material required
(b) “Road closed” boards and “Diversions” boards shall be fixed on both sides at 60 m
distance in advance of the hazard
(d) Labour shall be deputed to guide the traffic to prevent any accident till such time that
alternate arrangements are made by the department
9.3
Safety of Workers and Road Users during Maintenance
9.3.1 In the implementation of maintenance operations the contractor shall ensure safety of
workers and road users as outlined in Para 5.1
_____________
x`g foHkkx
vf/klwpuk
f'keyk&2] 4 vizSy] 2015
la[;k% x`g&lh0 ¼oh½ 2&1@2013-&fgekpy izns'k ds jkT;iky] Hkkjr ds lafo/kku ds vuqPNsn 309
ds ijarqd }kjk iznRr 'kfDr;ksa dk iz;ksx djrs gq,] fgekpy izns'k yksd lsok vk;ksx ds ijke'kZ ls] bl
foHkkx dh vf/klwpuk la[;k x`g&lh¼,½3&8@2006&1] rkjh[k 30&8&2007 }kjk vf/klwfpr fgekpy izns'k]
x`g foHkkx] jkT; U;k;kyf;d iz;ksx'kkyk] esa oSKkfud vf/kdkjh ¼Mh0 ,u0 ,0½] oxZ&II ¼jktif=r½ in ds
HkrhZ vkSj izksUufr] fu;e] 2007 esa vkSj la'kks/ku djus ds fy, fuEufyf[kr fu;e cukrs gS] vFkkZr~%&
1- Lakf{kIr uke vkSj izkjEHk-&¼1½ bu fu;eksa dk laf{kIr uke fgekpy izns'k] x`g foHkkx] jkT;
U;k;kyf;d iz;ksx'kkyk esa oSKkfud vf/kdkjh ¼Mh0,u0 ,0½] oxZ& II ¼jktif=r½ HkrhZ vkSj izksUufr ¼izFke
la'kks/ku½ fu;e] 2015 gSA
¼2½ ;s fu;e jkti=] fgekpy izns'k esa izdkf'kr fd, tkus dh rkjh[k ls izo`Rr gksaxsA
2- mikca/k ^d* dk la’kks/ku-&fgekpy izns'k] x`g foHkkx] jkT; U;k;kykf;d iz;ksx'kkyk] esa
oSKkfud vf/kdkjh ¼Mh0 ,u0 ,0½] oxZ& II ¼jktif=r½ HkrhZ vkSj izksUufr fu;e] 2007 ds mikca/k ^d* esa%&
122
jkti=] fgekpy izns'k] 6 vizSy] 2015@16 pS=] 1937
¼d½ LraHk la[;k&4 ds lkeus fo|eku mica/kksa ds LFkku ij fuEufyf[kr j[kk tk,xk] vFkkZr~ %&
ß10300&34800 #i, $ 4400 #i, xzsM isÞ
¼[k½ LraHk la[;k&15&d] ds lkeus fo|eku mica/kksa ds LFkku ij fuEufyf[kr j[kk tk,xk]
vFkkZr~%&
ßbu fu;eksa esa fdlh ckr ds gksrs gq, Hkh in ij lafonk fu;qfDr;ka uhps fn, x, fucU/kuksa vkSj
'krksZa ds v/;/khu dh tk,axh%&
(I) ladYiuk %
¼d½ bl ikWfylh ds v/khu] x`g foHkkx] fgekpy izns'k jkT; U;k;kyf;d foKku iz;ksx'kkyk esa
oSKkfud vf/kdkjh ¼Mh0 ,u0 ,0½ dks lafonk ds vk/kkj ij izkjEHk esa ,d o"kZ ds fy, yxk;k
tk,xk] ftls o"kkZuqo"kZ vk/kkj ij c<+k;k tk ldsxk%
ijUrq lafonk dh vof/k esa o"kkZuqo"kZ vk/kkj ij [email protected] ds fy, lEc) foHkkxk/;{k
;g izek.k i= tkjh djsxk fd lafonk ij fu;qDr O;fDr dh lsok vkSj vkpj.k] o"kZ ds nkSjku
lUrks"ktud jgk gS vkSj dsoy rHkh mldh lafonk dh vof/k uohd`r@foLrkfjr dh tk,xhA
¼[k½ in dk fgekpy izns'k yksd lsok vk;ksx ds dk;Z{ks= esa vkuk %&
lfpo ¼x`g½] fjDr inksa dks lafonk ds vk/kkj ij Hkjus ds fy, jkT; ljdkj dk vuqeksnu
izkIr djus ds Ik'pkr~ v/;kis{kk dks lEc) HkrhZ vfHkdj.k] vFkkZr~ fgekpy izns'k yksd lsok
vk;ksx ds le{k j[ksxkA
¼x½ p;u] bu fu;eksa esa fofgr ik=rk 'krksaZa ds vuqlkj fd;k tk,xk A
¼II ½ lafonkRed miyfC/k;kaW %
lafonk ds vk/kkj ij fu;qDr oSKkfud vf/kdkjh ¼Mh0 ,u0 ,0½ dks 14700@&#i, dh nj ls
lesfdr fu;r lafonkRed jde ¼tks is cSaM ds U;wure tek xzsM is ds cjkcj gksxh½ izfrekl
lanRr dh tk,xh A ;fn lafonk esa ,d o"kZ ls vf/kd dh c<+kSrjh dh tkrh gS] rks Ik'pkr~orhZ
o"kZ ¼o"kksZa½ ds fy, lafonkRed miyfC/k;ksa esa 441@&#i, dh jde ¼in ds is cSaM dk U;wure
tek xzsM is dk rhu izfr’kr ½ okf"kZd o`f) ds #Ik esa vuqKkr dh tk,xhA
¼III½ fu;qfDr@vuq’kklu izkf/kdkjh %
Lkfpo ¼x`g½] fgekpy Ikzns'k fu;qfDr vkSj vuq'kklu izkf/kdkjh gksxkA
¼IV½ p;u izfØz;k %
lafonk fu;qfDr dh n'kk esa in ij fu;qfDr ds fy, p;u] ekSf[kd ijh{kk ds vk/kkj ij fd;k
tk,xk ;k ;fn vko';d ;k lehphu le>k tk,] rks fyf[kr ijh{kk ;k O;kogkfjd ijh{kk ds
vk/kkj ij fd;k tk,xk] ftldk Lrj@ikB~;Øe vkfn lEc) HkrhZ izkf/kdj.k }kjk vo/kkfjr
fd;k tk,xkA
¼V½ lafonkRed fu;qfDr;ksa ds fy, p;u lfefr %
tSlh lEc) HkrhZ vfHkdj.k] vFkkZr~ fgekpy izns'k yksd lsok v;ksx }kjk le;≤ ij
xfBr dh tk,A
123
jkti=] fgekpy izns'k] 6 vizSy] 2015@16 pS=] 1937
¼VI½ djkj %
vH;FkhZ dks] p;u ds Ik'pkr~ bu fu;eksa ls layXu mikca/k&*[k* ds vuqlkj djkj gLrk{kfjr
djuk gksxkA
¼VII½ fucU/ku vkSj 'krsZa %
¼d½ lafonk ds vk/kkj ij fu;qDr O;fDr dks 14700@& #i, dh nj ls fu;r lafonkRed jde
¼tks is cSaM ds U;wure tek xzsM is ds cjkcj gksxh½ izfrekl lanRr dh tk,xhA lafonk ij
fu;qDr O;fDr vkxs c<k+, x, o"kZ@o"kksZa ds fy, lafonkRed jde esa 441@&#i, ¼in ds is
cSaM dk U;wure tek xzsM is dk rhu izfr'kr½ dh nj ls o`f) dk gdnkj gksxk vkSj vU;
dksbZ lgc) izlqfo/kk,a] tSls ofj"B@ p;u osrueku vkfn ugha fn;k tk,xk A
¼[k½ lafonk ij fu;qDr O;fDr dh lsok iw.kZr;k vLFkk;h vk/kkj ij gksxhA ;fn lafonk ij fu;qDr
O;fDr dk dk;[email protected] Bhd ugha ik;k tkrk gS] rks fu;qfDr lekIr fd, tkus ds fy, nk;h
gksxhA
¼x½ lafonk ij fu;qDr O;fDr] ,d ekl dh lsok iwjh djus ds Ik’pkr~ ,d fnu ds vkdfLed
vodk'k dk gdnkj gksxkA rFkkfi lafonk ij fu;qDr deZpkjh lksyg lIrkg ds izlwfr
vodk'k] nl fnu ds fpfdRlk vodk'k vkSj ikap fnu ds fo'k"sk vodk'k ds fy, Hkh gdnkj
gksxk@gksxhA og fpfdRlk izfriwfrZ vkSj ,y0Vh0lh0 vkfn ds fy, gdnkj ugha gksxk@gksxhA
lafonk ij fu;qDr O;fDr dks mijksDr ds flok; fdlh vU; izdkj dk dksbZ vodk'k vuqKkr
ugha gksxk %
ijUrq vuqiHkqDr vkdfLed vodk'k] fpfdRlk vodk'k vkSj fo'ks"k vodk'k ,d dyS.Mj o"kZ
rd lafpr fd;k tk ldsxk rFkk vkxkeh dyS.Mj o"kZ ds fy, vxzuhr ugha fd;k tk,xkA
¼?k½ fu;U=d vf/kdkjh ds vuqeksnu ds fcuk dRrZO; ¼M;wVh½ ls vuf/kd`r vuqifLFkfr ls Lor% gh
lafonk dk Ik;kZolku ¼lekiu½ gks tk,xkA rFkkfi vkiokfnd ekeyksa esa tgkWa ij fpfdRlk
vk/kkj ij dRrZO; ¼M;wVh½ ls vuf/kd`r vuqifLFkfr ds gkykr lafonk ij fu;qDr O;fDr ds
fu;U=.k ls ckgj gksa] rks mlds fu;ferhdj.k ds ekeys esa fopkj djrs le; ,slh vof/k
vioftZr ugha dh tk,xh] ijUrq in/kkjh dks bl ckcr le; ij fu;U=.k vf/kdkjh dks
lwfpr djuk gksxk A
rFkkfi lafonk ij fu;qDr O;fDr] dRrZO; ls vuqifLFkfr dh ,slh vof/k ds fy, lafonkRed
jde dk gdnkj ugha gksxk %
ijUrq mls ljdkj ds izpfyr vuqns'kksa ds vuqlkj] fpfdRlk vf/kdkjh }kjk tkjh fd, x,
chekjh@vkjksX; izek.k&i= dks izLrqr djuk gksxkA
¼M-½ lafonk ij fu;qDr in/kkjh] ftlus rSukrh ds ,d LFkku ij rhu o"kZ dk dk;Zdky iw.kZ dj
fy;k gS] vko';drk ds vk/kkj ij LFkkukUrj.k gsrq ik= gksxk] tgka Hkh iz'kklfud vk/kkj ij
,slk djuk visf{kr gksA
¼p½ p;fur vH;FkhZ dks ljdkjh@jftLVªhd`r fpfdRlk O;olk;h ls viuk vkjksX; izek.k&Ik=
izLrqr djuk gksxk A ckjg lIrkg ls vf/kd le; ls xHkZorh efgyk vH;FkhZ izlo gksus rd]
vLFkk;h rkSj ij vuqi;qDr cuh jgsxhA ,slh efgyk vH;FkhZ dk fdlh izkf/kd`r fpfdRlk
vf/kdkjh@O;olk;h }kjk mi;qDrrk ds fy, iqu% ijh{k.k fd;k tk,xkA
124
jkti=] fgekpy izns'k] 6 vizSy] 2015@16 pS=] 1937
¼N½ lafonk ij fu;qDr O;fDr dk ;fn vius inh; dRrZO;ksa ds lEcU/k esa nkSjs ij tkuk visf{kr
gks] rks og mlh nj ij] tSlh fu;fer izfrLFkkuh in/kkjh dks osrueku ds U;wure ij ykxw gS]
;k=k HkRrs@nSfud HkRrs dk gdnkj gksxk@gksxh A
¼t½ fu;fer deZpkfj;ksa dh n'kk esa ;Fkk ykxw lsok fu;eksa ds micU/k tSls ,Q- vkj-&,l- vkj-
NqVVh fu;e] lk/kkj.k Hkfo"; fuf/k fu;e] isa'ku fu;e rFkk vkpj.k fu;e vkfn lafonk ij
fu;qDr O;fDr;ksa dh n'kk esa ykxw ugha gksaxs A os bl LrEHk esa ;Fkkof.kZr miyfC/k;ksa vkfn ds
fy, gdnkj gksaxsAÞ
¼x½ mikca/k&^[k* ds fo|eku mica/kksa ds LFkku ij fuEufyf[kr j[kk tk,xk( vFkkZr~%&
&&&&&&&&&&
mikcU/k& ^^[k**
ÞoSKkfud vf/kdkjh ¼Mh0 ,u0 ,0½ vkSj fgekpy izns'k ljdkj ds e/;] lfpo ¼x`g½] fgekpy izns'k ds
ek/;e ls fu"ikfnr dh tkus okyh lafonk@djkj dk iz:i
;g djkj Jh@Jhefr------------------------------------------------------------ iq=@iq=h Jh-------------------------------------------------
fuoklh---------------------------------------------------------------] lafonk ij fu;qDr O;fDr ¼ftls blesa blds Ik'pkr~ ^^izFke
Ik{kdkj** dgk x;k gS½ vkSj fgekpy izns'k ds jkT;iky ds e/; lfpo ¼x`g½] fgekpy izns'k ¼ftls blesa
blds Ik'pkr~ 'f}rh; Ik{kdkj’ dgk x;k gS½ ds ek/;e ls vkt rkjh[k------------------------------- dks fd;k x;kA
^^f}rh; Ik{kdkj** us mijksDr izFke Ik{kdkj dks yxk;k gS vkSj izFke i{kdkj us oSKkfud vf/kdkjh ¼Mh0
,u0,0½ ds :Ik esa lafonk ds vk/kkj ij fuEufyf[kr fucU/ku vkSj 'krksZa ij lsok djus ds fy, lgefr nh
gS%&
1- ;g fd izFke Ik{kdkj oSKkfud vf/kdkjh ¼Mh0 ,u0 ,0½ ds :Ik esa----------------- ls izkjEHk gksus
vkSj------------- dks lekIr gksus okys fnu rd] ,d o’kZ dh vof/k ds fy, f}rh; Ik{kdkj dh lsok
esa jgsxkA ;g fofufnZ’V :Ik ls mfYyf[kr fd;k x;k gS vkSj nksuksa Ik{kdkjksa }kjk djkj ik;k
x;k gS fd izFke Ik{kdkj dh f}rh; Ik{kdkj ds lkFk lafonk] vkf[kjh dk;Z fnol~ vFkkZr~------------
fnu dks Lo;aeso gh Ik;Zoflr (lekIr) gks tk,xh vkSj lwpuk uksfVl vko';d ugha gksxk %
ijUrq lafonk vof/k esa o’kkZuqo’kZ vk/kkj ij [email protected] ds fy, lEc) foHkkxk/;{k ;g
izek.k i= tkjh djsxk fd lafonk ij fu;qDr O;fDr dh lsok vkSj vkpj.k] o’kZ ds nkSjku
lUrks’ktud jgk gS vkSj dsoy rHkh mldh lafonk uohd`r@foLrkfjr dh tk,xhA
2- izFke Ik{kdkj dh lafonkRed jde 14700@& #i, izfrekl gksxhA
3- izFke Ik{kdkj dh lsok iw.kZr;k vLFkk;h vk/kkj ij gksxhA ;fn lafonk ij fu;qDr O;fDr dk
dk;[email protected] Bhd ugha ik;k tkrk gS ;k ;fn fu;fer in/kkjh dks ml fjfDr ds fo#)
fu;qDr@rSukr dj fn;k tkrk gS] ftlds fy, izFke Ik{kdkj dks lafonk ij yxk;k x;k Fkk]
rks fu;qfDr Ik;Zoflr ¼lekIr½ dh tkus ds fy, nk;h gksxhA
4- lafonk ij fu;qDr oSKkfud vf/kdkjh ¼Mh0 ,u0 ,0½ ,d ekl dh lsok iwjh djus ds Ik'pkr~
,d fnu ds vkdfLed vodk'k dk gdnkj gksxkA rFkkfi lafonk ij fu;qDr deZpkjh lksyg
lIrkg ds izlwfr vodk'k] nl fnu ds fpfdRlk vodk'k vkSj ikWap fnu ds fo'ks’k vodk'k ds
fy, Hkh gdnkj gksxk@gksxhA og fpfdRlk izfriwfrZ vkSj ,y0Vh0lh0 vkfn ds fy, gdnkj
ugha gksxk@gksxhA lafonk ij fu;qDr oSKkfud vf/kdkjh ¼Mh0 ,u0 ,0½dks mijksDr ds flok;
fdlh vU; izdkj dk dksbZ vodk'k vuqKkr ugha gksxk %
125
jkti=] fgekpy izns'k] 6 vizSy] 2015@16 pS=] 1937
ijUrq vuqiHkqDr vkdfLed vodk'k] fpfdRlk vodk'k vkSj fo'ks’k vodk'k ,d dyS.Mj o’kZ
rd lafpr fd;k tk ldsxk rFkk bls vkxkeh dyS.Mj o’kZ ds fy, vxzuhr ugha fd;k
tk,xkA
5- fu;U=d vf/kdkjh ds vuqeksnu ds fcuk dRrZO; ls vuf/kd`r vuqifLFkfr ls Lor% gh lafonk
dk Ik;kZolku ¼lekiu½ gks tk,xkA rFkkfi vkiokfnd ekeyksa esa tgkWa ij fpfdRlk vk/kkj ij
dRrZO; ¼M;wVh½ ls vuf/kd`r vuqifLFkfr ds gkykr lafonk ij fu;qDr O;fDr ds fu;U=.k ls
ckgj gksa] rks mlds fu;ferhdj.k ds ekeys esa fopkj djrs le; ,slh vof/k vioftZr ugha
dh tk,xh] ijUrq in/kkjh dks bl ckcr le; ij fu;U=.k vf/kdkjh dks lwfpr djuk gksxkA
rFkkfi lafonk ij fu;qDr O;fDr dRrZO; ls vuqifLFkfr dh ,slh vof/k ds fy, lafonkRed
jde dk gdnkj ugha gksxkA
ijUrq mls ljdkj ds izpfyr vuqns“kksa ds vuqlkj] fpfdRlk vf/kdkjh }kjk tkjh fd, x,
chekjh@ vkjksX; izek.k i= dks izLrqr djuk gksxkA
6- lafonk ij fu;qDr oSKkfud vf/kdkjh ¼Mh0 ,u0 ,0½ ftlus rSukrh ds ,d LFkku ij rhu o’kZ
dk dk;Zdky iw.kZ dj fy;k gS] vko';drk ds vk/kkj ij LFkkukUrj.k gsrq ik= gksxk] tgka Hkh
iz“kklfud vk/kkj ij ,slk djuk visf{kr gks A
7- p;fur vH;FkhZ dks ljdkjh@jftLVªhd`r fpfdRlk O;olk;h ls viuk vkjksX; izek.k&Ik=
izLrqr djuk gksxkA efgyk vH;fFkZ;ksa dh n'kk esa] ckjg lIrkg ls vf/kd le; ls xHkZorh
efgyk izlo gksus rd vLFkk;h rkSj ij vuqi;qDr cuh jgsxhA ,slh efgyk vH;FkhZ dk fdlh
izkf/kd`r fpfdRlk vf/kdkjh@O;olk;h }kjk mi;qDrrk ds fy, iqu% ijh{k.k fd;k tkuk
pkfg, A
8- lafonk ij fu;qDr oSKkfud vf/kdkjh ¼Mh0 ,u0 ,0½ dk ;fn vius inh; dRrZO;ksa ds lEcU/k
esa nkSjs ij tkuk visf{kr gks] rks og mlh nj ij] tSlh fu;fer izfrLFkkuh in/kkjh dks
osrueku ds U;wure ij ykxw gS] ;k=k HkRrs@nSfud HkRrs dk gdnkj gksxk@ gksxh A
9- lafonk ij fu;qDr O;fDr¼;ksa½ dks deZpkjh lkewfgd chek ;kstuk ds lkFk&lkFk bZ-ih-,Q-@
th-ih-,Q Hkh ykxw ughsa gksxkA
blds lk{;Lo#i izFke Ik{kdkj o f}rh; Ik{kdkj us lkf{k;ksa dh mifLFkfr esa blesa loZizFke
mfYyf[kr rkjh[k dks vius&vius gLrk{kj dj fn, gSa A
lkf{k;ksa dh mifLFkfr esa%&
1-
-------------------------------------------
--------------------------------------------
¼uke o iwjk irk½
2-
------------------------------------------
--------------------------------------------
¼uke o iwjk irk½
¼izFke Ik{kdkj ds gLrk{kj½
lkf{k;ksa dh mifLFkfr esa%&
1-
-------------------------------------------
---------------------------------------------
¼uke o iwjk irk½
2-
------------------------------------------
126
jkti=] fgekpy izns'k] 6 vizSy] 2015@16 pS=] 1937
--------------------------------------------
¼uke o iwjk irk½
¼f}rh; Ik{kdkj ds gLrk{kj½**
vkns'k }kjk]
gLrk{kfjr@&
lfpo ¼x`g½A
&&&&&&&&&&
[Authoritative English text of this Government Notification number Home-C(B)-2-1/2013,
dated ----------- as required under clause(3) of Article 348 of the Constitution of India].
HOME DEPARTMENT
NOTIFICATION
4th April, 2015
No: Home-C(B)2-1/2013.—In exercise of the powers conferred by proviso to Article 309
of the Constitution of India, the Governor, Himachal Pradesh, in consultation with the Himachal
Pradesh Public Service Commission, is pleased to further amend the Recruitment & Promotion
Rules for the post of Scientific Officer (DNA), Class-II (Gazetted) notified in State Forensic
Science Laboratory, Home Department, Himachal Pradesh vide this department Notification No.
Home-C(A)-3-8/2006-I dated 30-8-2007, namely;-
1. Short title and Commencement.—(1) These Rules may be called the Himachal
Pradesh, State Forensic Science Laboratory, Home Department, Scientific Officer (DNA), Class-II
(Gazetted) Recruitment and Promotion (First Amendment) Rules, 2015.
(2) These Rules shall come into force from the date of publication in the Rajpatra,
Himachal Pradesh.
2. Amendment of Annexure “A.—In Annexure “A” to the Himachal Pradesh, State
Forensic Science Laboratory, Scientific Officer(DNA) Class-II (Gazetted), Recruitment and
Promotion Rules, 2007:-
(a) For the existing provisions against Column No. 4, the following shall be substituted,
namely:-
“Rs. 10300-34800+4400 GP.”
(b) For the existing provisions against Col.No.15-A, the following shall be substituted
namely:-
Notwithstanding anything contained in these rules, contract appointments to the post will be
made subject to the terms and conditions given below:-
127
jkti=] fgekpy izns'k] 6 vizSy] 2015@16 pS=] 1937
(I) CONCEPT
(a) Under this policy the Scientific Officer (DNA) in the State Forensic Science
Laboratory of Home Department, H.P. will be engaged on contract basis initially
for one year, which may be extendable on year to year basis.
Provided that for extension/ renewal of contract period on year to year basis the
concerned HOD shall issue a certificate that service and conduct of the contract
appointee is satisfactory during the year and only than his/ her period of contract
is to be renewed/extended.
(b) POST FALLS WITHIN THE PURVIEW OF HPPSC.—The Secretary
(Home) after obtaining the approval of the Government to fill up the vacant posts
on contract basis will place the requisition with the concerned recruiting agency
i.e. H.P. Public Service Commission.
(c) The selection will be made in accordance with the eligibility conditions as
prescribed in these Rules.
(II) CONTRACTUAL EMOLUMENTS :
The Scientific Officer (DNA) appointed on contract basis will be paid consolidated
fixed contractual amount @ Rs. 14700/- P.M.(which shall be equal to minimum of pay
band+Grade pay). An amount of 441/- (3% of the minimum of pay band + grade pay
of the post) as annual increase in contractual emoluments for the subsequent year(s)
will be allowed if contract is extended beyond one year.
(III) APPOINTING /DISCIPLINARY AUTHORITY:
The Secretary(Home),H.P. will be appointing and disciplinary authority.
(IV) SELECTION PROCESS:
Selection for appointment to the post in the case of contract appointment will be made
on the basis of viva-voce test or if consider necessary or expedient by a written test or
practical test the standard/syllabus etc. of which will be determined by the concerned
recruiting authority.
(V) COMMITTEE FOR SELECTION OF CONTRACTUAL APPOINTMENTS:
As may be constituted by the concerned recruiting agency i.e. the H.P. Public Service
Commission from time to time.
(VI) AGREEMENT :
After selection of a candidate, he/she shall sign an agreement as per Annexure-“B”
appended to these Rules.
(VII) TERMS AND CONDITIONS:
(a) The contractual appointee will be paid fixed contractual amount @ Rs. 14700/-
per month(which shall be equal to minimum of the pay band + Grade Pay). The
128
jkti=] fgekpy izns'k] 6 vizSy] 2015@16 pS=] 1937
Contract Appointee will be entitled for increase in contractual amount @ Rs.
441/-(3% minimum of the Pay Band+ Grade Pay of the post) for further extended
years and no other allied benefits such as senior/selection scales etc. shall be
given .
(b) The service of the Contract appointee will be purely on temporary basis. The
appointment is liable to be terminated in case the performance/ conduct of the
contract appointee is not found satisfactory.
(c) Contract appointee will be entitled for one day’s casual leave after putting one
month service. However, the contract appointee will also be entitled for 16 weeks
Maternity Leave, 10 day’s Medical Leave and 5 days special Leave. He/ She shall
not be entitled for medical Re-imbursement and LTC etc. No leave of any other
kind except above is admissible to the contract appointee.
Provided that the un-availed Casual Leave, Medical Leave and Special Leave can
be accumulated upto the Calendar Year and will not be carried forward for the
next Calendar Year.
(d) Unauthorized absence from the duty without the approval of the controlling
officer shall automatically lead to the termination of the contract. However, in
exceptional cases where the circumstances for un-authorized absence from duty
were beyond his/ her control on medical grounds, such period shall not be
excluded while considering his/ her case for regularization but the incumbent
shall have to intimate the controlling authority in this regard well in time.
However, the contract appointee shall not be entitled for contractual amount for
this period of absence from duty.
Provided that he/ she shall submit the certificate of illness/ fitness issued by the
Medical Officer, as per prevailing instructions of the Government.
(e) An official appointed on contract basis who have completed three years tenure at
one place of posting will be eligible for transfer on need based basis wherever
required on administrative grounds.
(f) Selected candidate will have to submit a certificate of his/her fitness from a
Government/ Registered Medical Practitioner. Women candidate pregnant beyond
twelve weeks will stand temporarily unfit till the confinement is over. The women
candidate will be re-examined for the fitness from an authorized Medical officer/
Practitioner.
(g) Contract appointee will be entitled to TA/ DA if required to go on tour in
connection with his/her official duties at the same rate as applicable to regular
counterpart officials at the minimum of pay scale.
(h) Provisions of service rules like FR SR, Leave Rules, GPF Rules, Pension Rules &
Conduct Rules etc. as are applicable in case of regular employees will not be
applicable in case of contract appointees. They will be entitled for emoluments
etc. as detailed in this Column.
(c) For the existing provisions in Annexure- “B”, the following shall be substituted,
namely:-
129
jkti=] fgekpy izns'k] 6 vizSy] 2015@16 pS=] 1937
Annexure-B
“Form of contract/agreement to be executed between the Scientific Officer (DNA) and the
Government of Himachal Pradesh through Secretary (Home), H.P.
This
agreement
is
made
on
this--------------------day
of
-------------------in
the
year...............Between Sh/Smt./Km...................S/o/D/o.................Shri...................R/o..................
................................................................................................ contract appointee (hereinafter called
the FIRST PARTY), AND The Governor, Himachal Pradesh through Secretary (Home), H.P (here-
in-after called the SECOND PARTY) The Second Party has engaged the aforesaid FIRST PARTY
and the FIRST PARTY has agreed to serve as a Scientific Officer (DNA) on contract basis on the
following terms & conditions:-
1. That the FIRST PARTY shall remain in the service of the SECOND PARTY as
Scientific Officer (DNA) for a period of one year commencing on day of................and
ending on the day of ........................... It is specifically mentioned and agreed upon by
both the parties that the contract of the FIRST PARTY with SECOND PARTY shall
ipso-facto
stand
terminated
on
the
last
working
day
i.e.
on................................................... And information notice shall not be necessary.
Provided that for the extension/renewal of contract period the HOD will issue a
certificate that the service and conduct of the contract appointee was satisfactory
during the year and only then the period of contract is to be renewed/ extended.
2. The contract amount of the FIRST PARTY will be Rs.14700/- P.M.
3. The service of FIRST PARTY will be purely on temporary basis. The appointment is
liable to be terminated in case the performance/conduct of the contract appointee is not
found good or if a regular incumbent is appointed /posted against the vacancy for
which the first party was engaged on contract.
4. The Contractual Scientific Officer (DNA) will be entitled for one day’s casual leave
after putting one month service. However, the contract appointee will also be entitled
for 16 weeks Maternity Leave, 10 day’s Medical Leave and 5 days Special Leave.
He/she shall not be entitled for Medical Re-imbursement and LTC etc. No leave of any
other kind except above is admissible to the contractual Scientific Officer (DNA).
Provided that the un-availed Casual Leave, Medical Leave and Special Leave can be
accumulated upto the Calendar Year and will not be carried forward for the next
Calendar Year.
5. Unauthorized absence from the duty without the approval of the controlling officer
shall automatically lead to the termination of the contract. However, in exceptional
cases where the circumstances for un-authorized absence from duty were beyond his/
her control on medical grounds, such period shall not be excluded while considering
his/ her case for regularization but the incumbent shall have to intimate the controlling
authority in this regard well in time.
However, the contract appointee shall not be entitled for contractual amount for this
period of absence from duty.
Provided that he/ she shall submit the certificate of illness/ fitness issued by the
Medical Officer, as per prevailing instructions of the Government.
130
jkti=] fgekpy izns'k] 6 vizSy] 2015@16 pS=] 1937
6. Transfer of Scientific Officer (DNA) appointed on contract basis who have completed
three years tenure at one place of posting will be eligible for transfer on need based
basis wherever required on administrative grounds.
7. Selected candidate will have to submit a certificate of his/her fitness from a
Government/Registered Medical Practitioner. In case of women candidates pregnancy
beyond twelve weeks will render her temporarily unfit till the confinement is over. The
women candidate should be re-examined for fitness from an authorized Medical
Officer/Practitioner.
8. Contract Scientific Officer (DNA) shall be entitled to TA/DA if required to go on tour
in connection with his/her official duties at the same rate as applicable to regular
counter part officials at the minimum of Pay Scale.
9. The Employees Group Insurance Scheme as well as EPF/GPF will not be applicable to
the contractual appointee(s).
In witness the First Party and Second Party name herein to set their hands the day, month
and year first above written
IN THE PRESENCE OF WITNESSES:
1.
..............................................................
...............................................................
...............................................................
(Signature of FIRST PARTY)
(Name and Full Address)
2.
…………………………………………
…………………………………………
…………………………………………
(Name and Full Address)
IN THE PRESENCE OF WITNESSES:
1.
..............................................................
..............................................................
..............................................................
(Signature of SECOND PARTY)”
(Name and Full Address)
2.
…………………………………………
…………………………………………..
…………………………………………
(Name and Full Address)
By order,
Sd/-
Secretary (Home).
131
jkti=] fgekpy izns'k] 6 vizSy] 2015@16 pS=] 1937
FOOD, CIVIL SUPPLIES & CONSUMER AFFAIRS DEPARTMENT, SIRMAUR
DISTRICT AT NAHAN, HIMACHAL PRADESH
NOTIFICATION
Nahan, 18th March, 2015
No.FDS.2-61/99-IV-1037-1095.—In supersession of this office Notification No. FDS.2-
61/99-IV-6431-6491 dated 08-12-2014, issued by this office and in exercise of the power conferred
upon me under clause 9 (e) of the LPG (Regulation of Supply and Distribution ) order, 2000 and
3 (1) (e) of the Himachal Pradesh Hoarding and Profiteering prevention order, 1977, I, Ritesh
Chauhan, I.A.S., District Magistrate, Sirmour District, Nahan do hereby refix the sale rates of
Domestic LPG Cylinders in respect of various Gas Agencies functioning in District Sirmour due to
revision of RSP from source as under:—
Sl.
No.
Name of Distribution Points
RSP per
Cylinder Inc.
Rs.8/ Cash &
carry rebate
14.2 Kg.
Additional
Cooliage/
Transporta-
tion charges
RSP Sale
Rate per
cylinder
14.2 Kg.
Remarks
1
H.P. State Civil Supplies Corp. Ltd. Nahan-I (Urban Area).
1. Nahan town. MC Area,
ward No. 1 to 13.
649.00
9.50
658.50
Door
delivery
2. Cantt area, R&T Factory,
Chiranwali & Jabbal ka bag.
649.00
11.00
660.00
Focal Point.
2
H.P. State Civil Supplies Corp. Ltd. Nahan-II (Rural Area).
1. Judda ka johar,
Bikrambag, Shambhuwala,
Bankala, Bohlion Baraban,
Ramadhoun, PipliWala,
Bhood, Koon, Talon,
Malonwala, Nehrla.
649.00
11.50
660.50
Focal point
2. Kala-Amb, Nagal Suketi .
649.00
14.50
663.50
Focal point
3. Kaulanwala Bhood and
Sen Ki Ser.
649.00
16.50
665.50
Focal point
4. Trilokpur Banethi.
649.00
16.50
665.50
Focal point
5. Sarahan.
649.00
17.50
666.50
Focal point
6. Lana Baka.
649.00
21.50
670.50
Focal point
7. Basahan.
649.00
22.50
671.50
Focal point
8. Naina-Tikker.
649.00
24.50
673.50
Focal point
9. Jamun ki Ser,
649.00
30.50
679.50
Focal point
10.Thakur Dwara
649.00
33.50
682.50
Focal point
11. Mangarh & Dinger
Kinner.
649.00
39.50
688.50
Focal point
12. Chanalag.
649.00
40.50
689.50
Focal point
13. Naya Gaon.
649.00
45.50
694.50
Focal point
3
H.P. State Civil Supplies Corp. Ltd. Rajgarh.
1. Police Station, Sr. Sec.
School, Main Bazar, Tehsil,
Forest Colony, Milk Plant,
Katli Banti.
648.00
9.50
657.50
Focal point
132
jkti=] fgekpy izns'k] 6 vizSy] 2015@16 pS=] 1937
2. Pabiana , Kothia Jhajjar
& Tikkar (Badgala)
648.00
10.50
658.50
Focal point
3.Yashwant
Nagar,Dahan,Bryla,Bhuria,F
agu, Deedag & Pidag
648.00
13.50
661.50
Focal point
4. Sanaora.
648.00
13.50
661.50
Focal point
5. Darow Devria, Maryog,
Dilman, Narag, Banon,
Gandal,Wasni, Sarol,
Chamenji, Kather, Sarsu,
Chabyoga, Patoga &
Shaariya.
648.00
18.50
666.50
Focal point
6. Bhalta.
648.00
18.50
666.50
Focal point
7. Khairi.
648.00
19.50
667.50
Focal point
8. Dimber.
648.00
19.50
667.50
Focal point
9. Donga Fag.
648.00
20.50
668.50
Focal point
10. Chaknal.
648.00
21.50
669.50
Focal point
11. Nohradhar & BaruSahib
648.00
22.50
670.50
Focal point
12. Habban.
648.00
22.50
670.50
Focal point
13. Shargaon.
648.00
23.50
671.50
Focal point
14.Ranaghat.
648.00
24.50
672.50
Focal point
15.Piran tarai (In Shimla
Distt.)
648.00
25.50
673.50
Focal point
16. Bogdhar & Piriadhar.
648.00
25.50
673.50
Focal point
17 Korag.
648.00
26.50
674.50
Focal point
18. Deva Manal.
648.00
26.50
674.50
Focal point
19.Chandol & Ser Tandula.
648.00
29.50
677.50
Focal point
20.Chambidhar, Niyog,
Sainj, Gawahi.
648.00
32.50
680.50
Focal point
21. Katogra.
648.00
33.50
681.50
Focal point
22. Dhamla.
648.00
33.50
681.50
Focal point
23. Thaina Basotri.
648.00
33.50
681.50
Focal point
24. Kotla Bangi.& Lau Nana 648.00
34.50
682.50
Focal point
25. Bharari &Punnerdhar.
648.00
35.50
683.50
Focal point
26. Lana Palar & Kotghat.
648.00
37.50
685.50
Focal point
27. Taproli.
648.00
43.50
691.50
Focal point
28. Bhawai, Shivpur, Deothi
Majhgaon.
648.00
44.50
692.50
Focal point
29. Painkuffar & Neripul.
648.00
45.50
693.50
Focal point
30. Lanachetta, Manwa,
Ghaneshwar
648.00
49.50
697.50
Focal point
31. Dhartukhadi.
648.00
53.50
701.50
Focal point
4
M/s Pardeep Gas Service, Paonta Sahib.
1. M.C.Area Paonta Sahib,
Taruwala, Batapul,
Bhatanwali & Kishanpura.
656.50
10.00
666.50
Door
delivery
2. Behral, Shivpur, Surajpur,
Haripur & Nihalgarh.
656.50
12.00
668.50
Focal point
3. Gulabgarh, Rajban,
Bangran & Salwala.
656.50
13.00
669.50
Focal point
133
jkti=] fgekpy izns'k] 6 vizSy] 2015@16 pS=] 1937
4. Killod.
656.50
16.00
672.50
Focal point
5. Singhpura & Bhagani.
656.50
17.00
673.50
Focal point
6. Amboya & Rajpur.
656.50
19.00
675.50
Focal point
7. Bias Kotri.
656.50
20.00
676.50
Focal point
8. Naghetta, Bhella and
Shivpur.
656.50
27.00
683.50
Focal point
5
M/s Shaheed Kulvinder Gas Agency, Dadahu.
1. Dadahu Main-
Bazar and Tehsil
Colony.
656.50
12.00
668.50
Focal point
2. Behrewala, Tokoin,
Sainwala, Majra.
656.50
12.00
668.50
Focal point
3.Khala Kyar, Bedon
& Renuka ji
656.50
12.00
668.50
Focal point
4.Puruwala,Kanshipu,
Misserwala
656.50
13.00
669.50
Focal point
5.Kolar, Dhaulakuan
& Haripurkhol.
656.50
16.00
672.50
Focal point
6. Baila, Kansar,
Ghaton, Bharog
Bhaneri, and via
Tirmali Kansar,
Malgi.
656.50
15.00
671.50
Focal point
7. Thana Kasoga
Dhagera, Birla &
Dhyali. via Tirmali.
656.50
15.00
671.50
Focal point
8. Jamta
656.50
15.00
671.50
Focal point
9. Giri Nagar,
Parduni.
656.50
15.00
671.50
Focal point
10. Kotla Molar &
Panar.
656.50
17.00
673.50
Focal point
11. Mehet, Jatton
656.50
18.00
674.50
Focal point
12. Panjahal via
Jamta.
656.50
18.00
674.50
Focal point
13. Bagthan.
656.50
20.00
676.50
Focal point
14.Koti Dhiman,
Chandni & Shadiar.
656.50
21.00
677.50
Focal point
15.Sangrah Teh.
Colony, Kali-Mitti,
Javgaldhar Police
Colony, High School.
656.50
27.00
683.50
Focal point
16. Andheri, Sainj &
Sunderghat
656.50
29.00
685.50
Focal point
17.Ganog, Barag .
656.50
29.00
685.50
Focal point
18. Parara, Bichar-ka-
Bagh, Mahipur
Paniyali & Chaknala.
656.50
30.00
686.50
Focal point
6
M/S Shaheed kalyan Gas Agency, Shillai.
1.Shillai, Naya
656.50
11.00
667.50
Focal point
2. Bandli, Kando,
656.50
13.00
669.50
Focal point
134
jkti=] fgekpy izns'k] 6 vizSy] 2015@16 pS=] 1937
Kyari, Drabil &
Balikoti.
3.Timbi .
656.50
18.00
674.50
Focal point
4. Sataun.
656.50
18.00
674.50
Focal point
5. Kafota.
656.50
20.00
676.50
Focal point
6. Kamrau and
Badwas & Bakras.
656.50
21.00
677.50
Focal point
7.Ronhat, Nainidhar,
Naya Pinjor Halahan.
656.50
21.00
677.50
Focal point
8. Jamna, Jakhna &
Cheyog & Tatiana.
656.50
27.00
683.50
Focal point
9. Sharli Manpur.
656.50
29.00
685.50
Focal point
7
H.P. State Civil Supplies Corp. Ltd. Haripurdhar.
1. Haripurdhar.
656.00
7.00
663.00
Focal point
2. Lawandhar.
656.00
7.00
663.00
Focal point
3. Chunvi, Korag,
Punchbhaya.
656.00
8.00
664.00
Focal point
4. Charna, Norabora,
& Bagi
656.00
9.00
665.00
Focal point
5.Trahankhud &
Jarwa
656.00
10.00
666.00
Focal point
6.Ghanduri, Bhalr,
Bhllona ,Gatadhar,
Panog, Sangna &
Satahan.
656.00
11.00
667.00
Focal point
7. Ajroli.
656.00
11.00
667.00
Focal point
8 . Kotibonch.
656.00
13.00
669.00
Focal point
9. Shivpur, Bhawai &
Choras
656.00
14.00
670.00
Focal point
10. Rasat.
656.00
17.00
673.00
Focal point
11. Kupvi.
656.00
16.00
672.00
Focal point
12. Kelvi (Distt.
Shimla)
656.00
22.00
678.00
Focal point
13. Kanda Banah
656.00
26.00
682.00
Focal point
14. Dochi, Kothi
656.00
28.00
684.00
Focal point
15. Maalat , Jubbli ,
Kanah, Mashot
656.00
34.00
690.00
Focal point
8
M/S Rajeev Gandhi Gramin Vikas Gas Agency, Amboya.
656.50
656.00
Focal point
9
M/S Rajeev Gandhi Gramin Vikas Gas Agency, Gorkhuwala.
656.50
656.00
Focal point
10
M/S Poswal Indane Gramin Vikas Gas Agency, at village Khairi (Trilokpur).
656.00
656.00
Focal point
135
jkti=] fgekpy izns'k] 6 vizSy] 2015@16 pS=] 1937
TERMS AND CONDITIONS:-
1.
All the Gas distributors shall issue cash memo to every consumers showing complete
name and address and Consumer Number and retain duplicate copy of the cash memo for
inspection.
2.
All the Gas Distributors shall not pressurize the consumers to purchase other equipment’s
i.e. Gas Stove while issuing new Gas connection and shall issue Gas connection on
priority basis and maintain Register in following manner:
Date
Opening
Stock
Receipt
Invoice
No.
Invoice
No.
Total
2+3
Issues
Refills.
Against
To Other
Distribution
Point.
To Defective
Stock.
Total
4+5+6+7
Closing
Balance.
1.
2.
3.
4
5.
6.
7.
8.
9.
10.
11.
3.
Every Distributor shall display the daily stock position/Price of the LPG refills on the
conspicuous place of the Gas Agency and Storage point.
4.
Every Gas Distributor shall also ensure to book the refills on telephone on the request of the
consumer as well as in person.
5.
The LPG Distributor shall not charge more than the price/cooliage fixed by the District
Magistrate, Sirmour. The rates of Door delivery shall be charged only when door delivery is
made. Where the distance of locality is more than one kilometer, there will be focal point
for distribution of LPG refills after every half kilometer at central place suitable to the
consumers of the respective area.
6.
The LPG Distributor shall ensure to maintain the proper record of the receipt and
distribution of the LPG Riffles and produce before the Inspecting Authority on demand.
7.
The LPG Distributor shall also ensure to supply LPG Refills to the consumer on the terms
and conditions/ Jurisdiction laid down by the concerned Oil Company and also ensure that
the refill supplied to the consumer is having standard weight, sealed and equipped with
safety cap and for this purposes weighing scale be kept in delivery van.
8.
The LPG Distributor shall also ensure immediate redressal of complaint lodged by the
consumers for leakage and other reason without further loss of time and render the service
of a trained mechanic free of cost keeping in view the security measures.
9.
Every Distributor shall also ensure to furnish monthly report immediately at the end of
every month or as and when required by the District Controller Food Civil Supplies &
Consumer Affairs, District Sirmour in respect of receipt and distribution of LPG cylinders.
10.
During the period of shortage of LPG refills the distributor shall distribute LPG refills to the
consumers on the direction of the District Magistrate/District Food & Supplies Controller,
Sirmour / Food Supplies Officer and concerned Inspector Food Civil Supplies & Consumer
Affairs. The dealer shall keep 25 LPG cylinder in Godown as reserved stocks at every time
which will be distributed only as per the direction of the concerned SDM and area
Inspector, FCS & CA.
11.
Every LPG dealer will allow cash and carry rebate of Rs. 8.00 to the consumer on every
refill when the refill is received from his Godown or Showroom on the explicit request of
the consumer/customer.
12.
Every LPG Dealer will supply LPG refills to the consumers strictly as per area of operation
fixed by the Oil Companies. Any deviation will be made only with the prior approval of the
DC/DCFCS&CA Nahan and concerned Sales Manager, of the Oil Company.
13.
Every Distributor shall ensure Public address system (Loud Speaker) on the vehicles,
weighing Machine, Laminated copy of Route Chart as well as latest RSP.
136
jkti=] fgekpy izns'k] 6 vizSy] 2015@16 pS=] 1937
14.
All the SDMs are required to make distribution charts of their respective area according to
the Route Chart and also publish the same in local newspaper for the convenience of
general public.
15.
Additional Colliage/Transportation Charges will remain in force till the further orders are
made while RSP may vary automatically as and when OMCs will change the RSP.
16.
Any Contravention will be viewed seriously and action under section 3/7 of the essential
commodities Act 1955 shall be taken against the defaulters.
-Sd-
District Magistrate,
District Sirmour at Nahan (H.P.).
__________
HIGHER EDUCATION DEPARTMENT
NOTIFICATION
Shimla-171 002, 6th April, 2015.
No. EDN-A-Ka(7)-4/2013-RTI .—In exercise of powers conferred by sub-section (1) and
(2) of section 5 of the Right to Information Act, 2005 (Act No. 22 of 2005) Smt Kanta Sharma,
Superintendent, Education-A Section is hereby appointed as Public Information Officer in the
subject matters relating to the Education-A Section, H.P. Secretariat till further orders or joining of
Section Officer, Education-A Section, H.P. Secretariat.
By order,
P. C. Dhiman,
Addl. Chief Secretary (Education).
_________
HIGH COURT OF HIMACHAL PRADESH SHIMLA -171001
NOTIFICATION
Shimla, the 31st March, 2015
No.HHC/Admn.3(333)/92-I.—12 days commuted leave on and w.e.f. 09.12.2014 to
20.12.2014,with permission to suffix Sunday on 21.12.2014, is hereby sanctioned, ex-post-facto, in
favour of Shri B.L.Soni, Secretary of this Registry.
Certified that Shri B.L.Soni has joined the same post and at the same station from where he
had proceeded on leave after the expiry of the above leave period.
Certified that Shri B.L.Soni would have continued to officiate the same post of Secretary
but for his proceeding on leave.
By order,
Sd/-
Registrar General.
__________
HIGH COURT OF HIMACHAL PRADESH SHIMLA -171001
NOTIFICATION
Shimla, the 26th March, 2015
No.HHC/Admn.3(406)/95-I.—05 days earned leave on and with effect from 23.03.2015 to
27.03.2015, with permission to prefix Sunday falling on 22.03.2015 and suffix Gazetted holiday
137
jkti=] fgekpy izns'k] 6 vizSy] 2015@16 pS=] 1937
and Sunday falling on 28.03.2015 & 29.03.2015, is hereby sanctioned in favour of Shri Gopal
Swaroop Kaushal , Secretary of this Registry
Certified that Shri Gopal Swaroop Kaushal is likely to join the same post and at the same
station from where he proceeds on leave after the expiry of the above leave period.
Certified that Shri Gopal Swaroop Kaushal would have continued to officiate the same post
of Secretary but for his proceeding on leave.
By order,
Sd/-
Registrar General.
_________
In the court of Dr. Jitender Kanwar, HPAS, LD. Sub Divisional Magistrate, Bharmour,
District Chamba (H.P.)
Case No. : 01/2015.
Shri Shyam Lal s/o Shri Roshan Lal, VPO Lamu, Tehsil Bharmour, District Chamba H.P.
[Husband] and
Neelma Devi d/o Shri Galora Ram, r/o Village Hilling, P.O. Lamu, Tehsil Bharmour,
District Chamba, H.P. [Wife]
. . Applicants.
Versus
1.
General Public
2.
The Registrar of Marriages Himachal Pradesh, Shimla
Subject.—Registration of marriage under Section 8(4) of the H.P. Registration of Marriages Act,
1996 (Act No. 21 of 1997).
PUBLIC NOTICE
Whereas, the above named applicants have made an application under Section 8(4) of the
Himachal Pradesh Registration of Marriages Act, 1996 alongwith an affidavit stating therein that
they have solemnized their marriage on dated 16-9-2007 at V.P.O. Lamu, Tehsil Bharmour, District
Chamba (HP) but has not been found entered in the records of the Gram Panchayat Holi.
And whereas, they have also stated that they were not aware of the laws for the registration
of marriage with the Registrar of marriages and now, therefore, necessary order for the registration
of their marriage be passed so that their marriage is registered by concerned authority.
Now, therefore, objections are invited from the general public that if anyone has any
objection regarding the registration of the marriage of the above named applicants, they should
appear before the undersigned in my court on dated 25-4-2015 at Mini Secretariat Bharmour,
District Chamba (HP) at 11.00 A.M. either personally or through their authorized agent.
138
jkti=] fgekpy izns'k] 6 vizSy] 2015@16 pS=] 1937
In the event of their failure to do so, orders shall be passed ex parte for the registration of
marriage without affording any further opportunity of being heard.
Issued under my hand and seal of the court on this 26th March, 2015.
Seal.
DR. JITENDER KANWAR,
Sub-Divisional Magistrate,
Bharmour, District Chamba (H.P.).
————
c vnkyr rglhynkj ,oa dk;Zdkjh n.Mkf/kdkjh] rglhy [kqf.M;ka] ftyk dkaxM+k ¼fg0 iz0½
dsl ua0 % /T/2015/Misc.
rkjh[k is'kh % 23&4&2015
Jh fd'kksj pUn iq= Jh cU'kh jke] fuoklh xkao [kjewg.k] Mk0 okjhdyka] rglhy [kqf.M;ka] ftyk
dkaxM+k ¼fg0 iz0½A
cuke
vke turk
muoku eqdÌek % tsjs /kkjk 13¼3½ tUe ,oa e`R;q iathdj.k vf/kfu;e] 1969 ds rgr e`R;q iathdj.kA
izkFkhZ Jh fd'kksj pUn iq= Jh cU'kh jke] fuoklh xkao [kjewg.k] Mk0 okjhdyka] rglhy [kqf.M;ka]
ftyk dkaxM+k ¼fg0 iz0½ us Lo;a mifLFkr gksdj izkFkZuk&i= izLrqr fd;k gS fd esjs pkpk Lo0 Jh jks'ku
yky dh e`R;q fnukad 23&7&1986 dks gks pqdh gS] dk iathdj.k dkuwu dh tkudkjh u gksus ds dkj.k
xzke iapk;r Mksyk [kj;kuk ds vfHkys[k esa ntZ u gks ldk gSA vr% mlds pkpk Lo0 Jh jks'ku yky dh
e`R;q frfFk dk iathdj.k xzke iapk;r Mksyk [kj;kuk ds vfHkys[k esa ntZ fd;k tk;sA
vr% loZlk/kkj.k dks lquokbZ gsrq ctfj;s b'rgkj jkti= }kjk lwfpr fd;k tkrk gS fd bl
lEcU/k esa fdlh izdkj dk mtj ,rjkt gks rks og fnukad 23&4&2015 dks vlkyru ;k odkyru is'k
gksdj viuk ,rjkt ntZ djok ldrk gSA mlds mijkUr dksbZ Hkh mtj@,rjkt tsj lek;r u gksxk rFkk
Jh fd'kksj pUn iq= Jh cU'kh jke ds pkpk Lo0 Jh jks'ku yky dh e`R;q frfFk dk iathdj.k fnukad
23&7&1986] tsjs /kkjk 13¼3½ tUe ,oa e`R;q iathdj.k vf/kfu;e] 1969 ds rgr xzke iapk;r Mksyk
[kj;kuk ds vfHkys[k esa ntZ djus ds vkns'k ikfjr dj fn;s tk;saxsA
vkt fnukad 26&3&2015 dks esjs gLrk{kj o eksgj vnkyr ls tkjh gqvkA
eksgjA
gLrk{kfjr@&
rglhynkj ,oa dk;Zdkjh n.Mkf/kdkjh]
[kqf.M;ka] ftyk dkaxM+k ¼fg0 iz0½A
139
jkti=] fgekpy izns'k] 6 vizSy] 2015@16 pS=] 1937
c vnkyr lgk;d lekgrkZ izFke Js.kh] fuje.M] ftyk dqYyw ¼fg0 iz0½
eqdÌek ua0 % 10@2014
Jherh deyk nsoh iRuh Jh vkcs jke] xkao fuje.M] Mkd?kj fuje.M] ftyk dqYyw ¼fg0 iz0½
- - okfn;kA
cuke
1- ckyd jke iq= isxk jke] xkao o QkVh fuje.M] ftyk dqYyw ¼fg0 iz0½] 2- ijfeyk nsoh iRuh
Jh loZn;ky] xkao vksMh/kkj] QkVh fuje.M] ftyk dqYyw ¼fg0 iz0½] 3- Jh esgj nkl iq= Jh Vqydw jke]
xkao dq.MkdksM] rglhy fuje.M] ftyk dqYyw] ¼fg0 iz0½ 4- lSgxy dqekj iq= laxrw] xkao 'kjdksVh]
rglhy fuje.M] ftyk dqYyw ¼fg0 iz0½] 5- jktw iq= uxhu] xkao] Mk0 o rglhy lquh] ftyk f'keyk
¼fg0 iz0½] 6- lrh'k dqekj iq= iq"i nso] xkao f'k'koh] rglhy fuje.M] ftyk dqYyw ¼fg0 iz0½] 7- gjcal
yky iq= iq"i nso] xkao f'k'koh] rglhy fuje.M] ftyk dqYyw ¼fg0 iz0½] 8- ;'kks/kk nsoh iRuh iq"i nso]
xkao f'k'koh] Mk0 tMksyh] rglhy fuje.M] ftyk dqYyw ¼fg0 iz0½] 9- 'kkarh iq=h xkso/kZu nr] xkao o Mk0
fuje.M] ftyk dqYyw ¼fg0 iz0½] 10- larks"k dqekj iq= ;Kk ckyd] xkao o Mk0 fuje.M] ftyk dqYyw ¼fg0
iz0½] 11- vtks/;k nsoh iq=h o'kks/kk uUn] xkao o Mk0 fuje.M] ftyk dqYyw ¼fg0 iz0½] 12- f'ko dqekj iq=
;Kk ckyd] xkao o Mk0 fuje.M] ftyk dqYyw ¼fg0 iz0½] 13-;ksx jkt iq= t; nso] xkao fuje.M] rglhy
fuje.M] ftyk dqYyw ¼fg0 iz0½] 14- fueZyk iRuh ujs'k] xkao fuje.M] rglhy fuje.M] ftyk dqYyw
¼fg0 iz0½] 15- fg0 iz0 jkT; lgdkjh foi.ku vkSj mi&Hkksxrk foHkkx
- - izfroknhA
cuke
Jh gjcal yky iq= iq"i jke] xkao f'k'koh] QkVh fuje.M] ;'kks/kk nsoh] iRuh Jh iq"i jke] xkao
f'k'koh] QkVh fuje.M] larks"k dqekj iq= ;Kk ckyd] fuoklh o QkVh fuje.M] f'ko dqekj iq= ;Kk
ckyd] fuoklh o QkVh fuje.M] ;ksx jkt iq= Jh t; nso] fuoklh o QkVh fuje.M o fueZyk nsoh iRuh
ujs'k] fuoklh o QkVh fuje.M] ftyk dqYyw ¼fg0 iz0½A
muoku eqdÌek % izkFkZuk&i= tsj /kkjk 123 fg0 iz0] Hkw0 jktLo vf/kfu;e] 1954 ds vUrxZr gqdeu
rdlheA
bl vnkyr esa deyk nsoh iRuh Jh vkHks jke us izkFkZuk&i= gqdeu rdlhe Hkwfe [kkrk@[krkSuh
ua0 997@1125] 1126] 1128] 1129] [kljk ua0 3377] 4886] 4921] 6995@4928] 1178] 5786] 1005] 4161]
4269 jdck rknknh 17&13&00 ch?kk] QkVh fuje.M] dksBh fgejh] rglhy fuje.M] ftyk dqYyw ¼fg0 iz0½
xqtkj dj fuosnu fd;k gS fd mldk Qjhdsu nks;e ds lkFk eq'rjdk [kkrk gksus ls ges'kk eqrZuktk cuk
jgrk gSA blfy, mldh Hkwfe eq'krjdk [kkrk dks gqdeu vkns'k dj vyx [kkrk dk;e fd;k tkosA
bl vnkyr }kjk lHkh i{kksa dks ctfj;k leu tkjh dj ryc fd;k x;k ijUrq izfroknh gjcal
yky iq= iq"i jke] xkao f'k'koh] QkVh fuje.M] ;'kks/kk nsoh iRuh Jh iq"i jke] xkao f'k'koh] QkVh fuje.M]
larks"k dqekj iq= ;Kk ckyd] fuoklh o QkVh fuje.M] f'ko dqekj iq= ;Kk ckyd] fuoklh o QkVh
fuje.M] ;ksx jkt iq= Jh t; nso] fuoklh o QkVh fuje.M o fueZyk nsoh iRuh ujs'k] fuoklh o QkVh
fuje.M dks leuksa dh rkehy lkekU; rjhds ls ugha gks ikbZ gSA blfy, oknh us vnkyr ls xqtkfj'k
fd;k fd leu dh rkehy v[kckj o jkti= esa izdk'ku dj fd;k tk,] ftls Lohdkj fd;k x;kA
140
jkti=] fgekpy izns'k] 6 vizSy] 2015@16 pS=] 1937
vr% bl b'rgkj }kjk mijksDr lHkh xSjgkftj izfroknhx.k dks lwfpr fd;k tkrk gS fd os fnukad
27&4&2015 dks ojoDr izkr% 10-00 cts vlkyru o odkyru gkftj gksdj mDr eqdÌek dh iSjoh djs
vU;Fkk xSjgkftjh dh lwjr esa dk;Zokgh ,d rjQk vey esa ykbZ tk,xh o mDr rkjh[k ds ckn dksbZ
nyhy ekU; ugha gksxhA
vkt fnukad 23&3&2015 dks gekjs gLrk{kj o eksgj vnkyr ls tkjh gqvkA
eksgjA
gLrk{kfjr@&
lgk;d lekgrkZ izFke Js.kh]
fuje.M] ftyk dqYyw ¼fg0 iz0½A
&&&&&
c vnkyr jeu ?kjlaxh] dk;Zdkjh n.Mkf/kdkjh] cUtkj] ftyk dqYyw ¼fg0 iz0½
rkjh[k is'kh % 25&4&2015
Jh jke d`".k iq= Jh eaxyw jke] fuoklh f?k;kxh] Mkd?kj ftfHk] rglhy cUtkj] ftyk dqYyw
¼fg0 iz0½
cuke
vke turk
izkFkZuk&i= tsj /kkjk 13¼3½ tUe iathdj.k vf/kfu;e] 1969 ds rgr mijksDr izkFkhZ us
v/kksgLrk{kjh dh vnkyr esa izkFkZuk&i= e; C;ku gfYQ;k bl vk'k; ls xqtkjk gS fd mlds iq= vkj;u
dh tUe frfFk 3&10&1992 dks gS] tks fd xzke iapk;r [kkM+kxkM+ ds vfHkys[k esa ntZ u gS vkSj ftls ntZ
fd;k tk,A
vr% bl lEcU/k esa loZlk/kkj.k dks lwfpr fd;k tkrk gS fd izkFkhZ ds iq= vkj;u dh tUe frfFk
xzke iapk;r [kkM+kxkM ds vfHkys[k esa ntZ djus esa ;fn fdlh dks dksbZ vkifŸk gks rks og fnukad
25&4&2015 dks vlkyru ;k odkyru vnkyr gtk esa vkdj viuh vkifŸk ntZ djsA rkjh[k xqtjus ds
ckn fdlh Hkh izdkj dk ,rjkt ekU; u gksxk rFkk ,d rjQk dk;Zokgh vey esa ykbZ tkdj tsj /kkjk
13¼3½ tUe iathdj.k vf/kfu;e] 1969 ds rgr tUe frfFk ds bUnzkt djus ds vkns'k ikfjr fd, tk,axsA
vkt fnukad 23&3&2015 dks esjs gLrk{kj o eksgj vnkyr ls tkjh gqvkA
eksgjA
jeu ?kjlaxh]
dk;Zdkjh n.Mkf/kdkjh]
cUtkj] ftyk dqYyw ¼fg0 iz0½A
141
jkti=] fgekpy izns'k] 6 vizSy] 2015@16 pS=] 1937
c vnkyr Jh eqds'k 'kekZ] lgk;d lekgrkZ izFke Js.kh] jkeiqj cq'kSgj] ftyk f'keyk ¼fg0 iz0½
ua0 eqdÌek % 24@2014
rkjh[k nk;j % 28&6&2014
Jh j?kw nkl iq= Jh ?kqUnh] fuoklh xkao e?kkjk] Mk0 nksQnk] rglhy jkeiqj cq'kSgj] ftyk f'keyk
¼fg0iz0½
- - oknhx.kA
cuke
1- Jh uks[kh jke iq= Jherh yqEch] fuoklh xkao cVkyh] rglhy jkeiqj cq'kSgj] ftyk f'keyk
¼fg0 iz0½A
2- Jh xaxk nkl iq= Jherh yqEch] fuoklh xkao cVkyh] rglhy jkeiqj cq'kSgj] ftyk f'keyk
¼fg0 iz0½A
3- Jherh rkaÅ nsoh iq=h Jherh yqEch] fuoklh xkao cVkyh] rglhy jkeiqj cq'kSgj] ftyk f'keyk
¼fg0 iz0½A
4- Jh ine nkl iq= Jherh Hkkxh] fuoklh xkao >kdM+h] rglhy jkeiqj cq'kSgj] ftyk f'keyk
¼fg0 iz0½
5- Jh lksgu yky iq= Jherh Hkkxh] fuoklh xkao >kdM+h] rglhy jkeiqj cq'kSgj] ftyk f'keyk
¼fg0 iz0½A
6- Jh usg# iq= Jherh Hkkxh] fuoklh xkao >kdM+h] rglhy jkeiqj cq'kSgj] ftyk f'keyk ¼fg0iz0½
7- Jherh ihaxyk iq=h Jherh Hkkxh] fuoklh xkao >kdM+h] rglhy jkeiqj cq'kSgj] ftyk f'keyk
¼fg0 iz0½A
8- Jherh xaxw iq=h ftÅ gkykckn iRuh Jh lqc yky usxh] fuoklh xkao lkiuh] rglhy fupkj]
ftyk fdUukSj ¼fg0 iz0½A
9- Jh iz'kksre iq= Jh jru pUn] fuoklh xkao QqUtk] rglhy jkeiqj cq'kSgj] ftyk f'keyk
¼fg0 iz0½A
10- Jh lq/kw iq= Jh VS.kw] fuoklh xkao e?kkjk] rglhy jkeiqj cq'kSgj] ftyk f'keyk ¼fg0 iz0½
11- Jh vkxj nkl iq= Jh cq)w] fuoklh xkao e?kkjk] rglhy jkeiqj cq'kSgj] ftyk f'keyk
¼fg0 iz0½
- - izfroknhA
nj[okLr rdlhe tsj /kkjk 123 fg0 iz0 Hkw&jktLo vf/kfu;e vjkth [kkrk eq'krjdk [kkrk@[krkSuh ua0
68@225 rk 240] fdŸkk 62] jdck rknknh 03&41&52 gS0] ckdk pd e?kkjk] rglhy jkeiqj cq'kSgj] ftyk
f'keyk ¼fg0 iz0½A
uksfVl cuke vke turkA
Jh j?kw nkl iq= Jh ?kqUnh] fuoklh xkao e?kkjk] Mk0 nksQnk] us vjkth [kkrk@[krkSuh ua0 68@225
rk 240] fdŸkk 62] jdck rknknh 03&41&52 gS0] ckdk pd e?kkjk] rglhy jkeiqj cq'kSgj] ftyk f'keyk
¼fg0 iz0½ dk rdlhe izdj.k bl vnkyr dks cjk;s gqdeu rdlhe izLrqr fd;k gS] tks bl vnkyr esa
142
jkti=] fgekpy izns'k] 6 vizSy] 2015@16 pS=] 1937
fopkjk/khu gSA izfroknh ua0 1 rk 11 dh rkehy ckj&ckj leu tkjh fd;k tkus ds ckotwn Hkh vlkyru
ugh gks ik jgh gS] ftl dkj.k bl vnkyr dks ;dhu gks x;k gS fd budh rkehy lk/kkj.k rjhds ls gksuh
lEHko izrhr ugha gksrh gSA mijksDr izfroknh ua0 1 rk 11 dh rkehy vlkyru u gksus ds dkj.k izdj.k
rdlhe yfEcr pyk vk jgk gSA vr% izfroknh ua0 1 rk 11 dks bl b'rgkj }kjk lwfpr fd;k tkrk gS
fd fnukad 28&4&2015 dks izkr% 10-00 cts vlkyru ;k odkyru iSjoh eqdÌek gsrq gkftj vnkyr
vk;saA gkftj u vkus dh lwjr esa ;g le>k tk,xk fd rdlhe ckjs izfroknh dk dksbZ ,rjkt ugha gS rFkk
;d rjQk dk;Zokgh vey esa ykbZ tkosxhA
vkt fnukad 26&3&2015 dks gekjs gLrk{kj o eksgj vnkyr ls tkjh fd;k x;kA
eksgjA
eqds'k 'kekZ]
lgk;d lekgrkZ izFke Js.kh]
jkeiqj cq'kSgj] ftyk f'keyk ¼fg0 iz0½A
&&&&&&
c vnkyr Jh Hkxoku flag] dk;Zdkjh n.Mkf/kdkjh] jkeiqj cq'kSgj] ftyk f'keyk ¼fg0 iz0½
ua0 eqdÌek % 26@2014
rkjh[k nk;j % 28&7&2014
Jh lrh"k dqekj iq= Lo0 Jh Hkxoku nkl] fuoklh xkao iytkjk] rglhy jkeiqj cq'kSgj] ftyk
f'keyk ¼fg0iz0½
- - oknhA
cuke
vke turk
- - izfroknhA
izkFkZuk&i= tsj /kkjk 13¼3½ tue ,oa e1R;q iathdj.k vf/kfu;e] 1969-
uksfVl cuke vke turkA
Jh lrh"k dqekj iq= Lo0 Jh Hkxoku nkl] fuoklh xkao iytkjk] rglhy jkeiqj cq'kSgj] ftyk
f'keyk ¼fg0iz0½ us bl vnkyr esa izkFkZuk&i= e; 'kiFk&i= xqtkjk gS fd eqrkfcd Ldwy vfHkys[k
vkosnd ds iq= dk uke **e;ad Hk.Mkjh** gS ijUrq xzke iapk;r ckgyh ds vfHkys[k esa vkosnd ds iq= dk
uke **jkgqy** ntZ fd;k x;k gS tks lgh ugha gSA vkosnd vius iq= dk uke xzke iapk;r vfHkys[k ckgyh
esa jkgqy ds LFkku ij **e;ad Hk.Mkjh** n#Lr djokuk pkgrk gSA
vr% bl b'rgkj }kjk loZlk/kkj.k dks lwfpr fd;k tkrk gS fd ;fn fdlh O;fDr dks mijksDr
oknh ds iq= dk uke LFkkuh; iapk;r vfHkys[k esa **jkgqy** ds LFkku ij **e;ad Hk.Mkjh** n#Lr djus ckjs
dksbZ vkifŸk gks rks fnukad 25&4&2015 dks ;k blls iwoZ vnkyr gtk esa gkftj vkdj viuh vkifŸk ntZ
djok ldrk gS ckn xqtjus fe;kn dksbZ Hkh mtj@,rjkt dkfcys lek;r u gksxk rFkk fu;ekuqlkj
iapk;r vfHkys[k esa uke n#Lrh ds vkns'k ikfjr fd, tk,axsA
vkt fnukad 14&3&2015 dks esjs gLrk{kj o eksgj vnkyr ls tkjh fd;k x;kA
eksgjA
Hkxoku flag]
dk;Zdkjh n.Mkf/kdkjh]
jkeiqj cq'kSgj] ftyk f'keyk ¼fg0 iz0½A
143
jkti=] fgekpy izns'k] 6 vizSy] 2015@16 pS=] 1937
c vnkyr lgk;d lekgrkZ izFke Js.kh] jkeiqj cq'kSgj] ftyk f'keyk ¼fg0 iz0½
ua0 eqdÌek % 20@2013
rkjh[k nk;j % 31&5&2013
1- Jh cyh jke iq= Lo0 Jh ?kslw mQZ ds'ko jke] fuoklh xkao dk'kkikV] rglhy jkeiqj cq'kSgj]
ftyk f'keyk ¼fg0iz0½A
2- Jh jke yky iq= Lo0 Jh ?kslw mQZ ds'ko jke] fuoklh xkao dk'kkikV] rglhy jkeiqj
cq'kSgj] ftyk f'keyk ¼fg0iz0½A
3- Jherh ckbZ iRuh Lo0 Jh ?kslw mQZ ds'ko jke] fuoklh xkao dk'kkikV] rglhy jkeiqj
cq'kSgj] ftyk f'keyk ¼fg0iz0½
- - oknhx.kA
cuke
1- Jh 'ksj flag iq= Jh nsoh lju] fuoklh xkao #.kiw] Mk0 fdUuw] rglhy jkeiqj cq'kSgj] ftyk
f'keyk ¼fg0 iz0½A
2- Jherh xaxh iq=h Lo0 Jh lru nkl gky iRuh Lo0 Jh crjh pUn] fuoklh xkao ikV] Mk0
d.Mh] rglhy jkeiqj cq'kSgj] ftyk f'keyk ¼fg0 iz0½A
3- Jh dSyk'k pUn iq= Lo0 Jh lru nkl] fuoklh xkao o Mk0 dk'kkikV] rglhy jkeiqj
cq'kSgj] ftyk f'keyk ¼fg0 iz0½A
- - izfroknhA
nj[okLr rdlhe tsj /kkjk 123 fg0 iz0 Hkw&jktLo vf/kfu;e vjkth [kkrk eq'krjdk [kkrk@[krkSuh ua0
68 feu@224 rk 226] fdŸkk 13] jdck rknknh 01&39&03 gS0] ckdk pd dk'kk] rglhy jkeiqj cq'kSgj]
ftyk f'keyk ¼fg0 iz0½A
uksfVl cuke vke turkA
oknhx.k ua0 1 rk 3 us vjkth [kkrk@[krkSuh ua0 68 feu@224 rk 226] fdŸkk 13] jdck rknknh
01&39&03 gS0] ckdk pd dk'kk] rglhy jkeiqj cq'kSgj] ftyk f'keyk ¼fg0 iz0½ dk rdlhe izdj.k bl
vnkyr dks cjk;s gqdeu rdlhe izLrqr fd;k gS] tks bl vnkyr esa fopkjk/khu gSA izfroknh ua0 1 rk 3
dh rkehy ckj&ckj leu tkjh fd;k tkus ds ckotwn Hkh vlkyru ugh gks ik jgh gS] ftl dkj.k bl
vnkyr dks ;dhu gks x;k gS fd budh rkehy lk/kkj.k rjhds ls gksuh lEHko izrhr ugha gksrh gSA
mijksDr izfroknh ua0 1 rk 3 dh rkehy vlkyru u gksus ds dkj.k izdj.k rdlhe yfEcr pyk vk jgk
gSA vr% izfroknh ua0 1 rk 3 dks bl b'rgkj }kjk lwfpr fd;k tkrk gS fd fnukad 25&4&2015 dks izkr%
10-00 cts vlkyru ;k odkyru iSjoh eqdÌek gsrq gkftj vnkyr vk;saA gkftj u vkus dh lwjr esa ;g
le>k tk,xk fd bl rdlhe ckjs mijksDr izfroknh dk dksbZ ,rjkt ugh gS rFkk ;d rjQk dk;Zokgh
vey esa ykbZ tkosxhA
vkt fnukad 13&3&2015 dks gekjs gLrk{kj o eksgj vnkyr ls tkjh fd;k x;kA
eksgjA
gLrk{kfjr@&
lgk;d lekgrkZ izFke Js.kh]
jkeiqj cq'kSgj] ftyk f'keyk ¼fg0 iz0½A
144
jkti=] fgekpy izns'k] 6 vizSy] 2015@16 pS=] 1937
c vnkyr Jh Hkxoku flag] lgk;d lekgrkZ f}rh; Js.kh] jkeiqj cq'kSgj] ftyk f'keyk ¼fg0 iz0½
ua0 eqdÌek % 27@2014
rkjh[k nk;j % 27&8&2014
Jh foØe flag iq= Jh vej flag] fuoklh xkao uksxyh] rglhy jkeiqj cq'kSgj] ftyk f'keyk
¼fg0 iz0½
- - oknhA
cuke
vke turk
- - izfroknhA
nj[okLr ¼uke n#Lrh½ lsgr bUnzkt vjkth [kkrk@[krkSuh ua0 156@403] [kljk ua0 1556@139] jdck
rknknh 00&00&88 gS0] okdk pd dqelw] rglhy jkeiqj cq'kSgj] ftyk f'keyk ¼fg0 iz0½
uksfVl cuke vke turkA
;g nj[okLr Jh foØe flag iq= Jh vej flag] fuoklh xkao uksxyh] rglhy jkeiqj cq'kSgj] ftyk
f'keyk ¼fg0 iz0½ us bl vk'k; ls izLrqr dh gS fd vjkth [kkrk@[krkSuh ua0 156@403] [kljk ua0
1556@139] jdck rknknh 00&00&88 gS0] okdk pd dqelw] ds dkxtkr eky esa oknh dk uke gsih iq=
vej flag ntZ gS] tks lgh ugha gS] tcfd oknh ds 'kS{kf.kd izek.k&i=] udy ifjokj jftLVj xzke
iapk;r HkM+koyh esa foØe flag iq= vej flag gSA oknh viuk uke mijksDr eky dkxtkr esa gsih iq=
vej flag ds LFkku ij foØe flag n#Lr@ntZ djokuk pkgrk gSA
vr% bl b'rgkj }kjk loZlk/kkj.k dks lwfpr fd;k tkrk gS fd ;fn fdlh O;fDr dks oknh dk
uke mijksDr eky dkxtkr esa gsih iq= vej flag ds LFkku ij foØe flag iq= vej flag n#Lr djus
ckjs dksbZ vkifŸk gks rks fnukad 25&4&2015 dks ;k blls iwoZ vnkyr gtk esa gkftj vkdj viuh vkifŸk
ntZ djok ldrk gSA ckn xqtjus fe;kn dksbZ Hkh mtj@,rjkt dkfcys lek;r u gksxk rFkk fu;ekuqlkj
oknh dk uke eky dkxtkr esa uke n#Lr djus ds vkns'k ikfjr fd, tk,axsA
vkt fnukad 14&3&2015 dks esjs gLrk{kj o eksgj vnkyr ls tkjh fd;k x;kA
eksgjA
Hkxoku flag]
lgk;d lekgrkZ f}rh; Js.kh]
jkeiqj cq'kSgj] ftyk f'keyk ¼fg0 iz0½A
&&&&&&
CHANGE OF NAME
I, Sukhbir Singh s/o Shri K.P. Singh, permanent resident of H.No. 76/3, Vasant Vihar
colony, Bye-pass Solan, P.O. Saproon, Tehsil & District Solan (H.P.) have changed the name of my
minor son from Yash Thakur to Yaduvendra Singh for all purposes. All concerned may please
note.
SUKHBIR SINGH,
s/o Shri K.P. Singh, permanent resident of H.No. 76/3,
Vasant Vihar colony, Bye-pass Solan, P.O. Saproon,
Tehsil & District Solan (H.P.).
fu;U=d] eqnz.k rFkk ys[ku lkexzh] fgekpy izns'k] f'keyk&5 }kjk eqfnzr rFkk izdkf'kr
bysDVªkWfud gLrk{kfjr jkti=] oSclkbV http://rajpatrahimachal.nic.in ij miyC/k gS ,oe~ vkWuykbu lR;kfir fd;k tk ldrk gS