jkti=] fgekpy izns'k
fgekpy izns'k jkT; 'kklu }kjk izdkf'kr
lkseokj] 3 vxLr] 2015@12 Jko.k] 1937
fgekpy izns'k ljdkj
HIMACHAL PRADESH ELECTRICITY REGULATORY COMMISSION, SHIMLA
NOTIFICATION
Shimla, the 31st July, 2015
No. HPERC– H (1)-11/2015.—WHEREAS the National Electricity Policy notified by the
Central Government mandates promotion of renewable technology on sustainable basis. Among the
various renewable sources, the solar power offers clean, climate-friendly, abundant and
inexhaustible energy resource;
89&jkti=@2015&03&08&2015 ¼2725½
2726
jkti=] fgekpy izns'k] 3 vxLr] 2015@12 Jko.k] 1937
AND WHEREAS there is a huge potential of Small Hydro power in the State of Himachal
Pradesh and considerable progress has been achieved towards exploitation of such potential in the
State. At the same time, the Himachal Pradesh, being a hilly State, has generally clear sky and
average solar radiation level, favours commercial as well as domestic application of solar power.
The Central Government has estimated 34 GW solar power potential in State out of 749 GW,
estimated in the country;
AND WHEREAS the Central Government, having recogonised the importance of solar
power technology at national level, unveiled a plan to produce 20 GW of solar power by the year
2022 and further revised the target to 100 GW out of which substantial exploitation is planned
through rooftop Solar PV projects;
AND WHEREAS there is a large potential available for generating power using unutilized
space on rooftops and wastelands around buildings, installation of rooftop Solar PV projects by the
consumers would enhance grid stability and reduce distribution losses and also result in saving in
electricity bills of the consumer and sale of surplus power to the distribution licensee through net
metering;
AND WHEREAS the Himachal Pradesh Electricity Regulatory Commission, recognized
the need for a net metering based regulations, for rooftop Solar PV projects, to address the
regulatory domain for implementation of grid connected net metering based rooftop Solar projects;
NOW, THEREFORE, in exercise of the powers conferred by section 181, read with
sections 61, 66, and 86(1) (e) of the Electricity Act, 2003 (36 of 2003), and all other powers,
enabling it in this behalf, the Himachal Pradesh Electricity Regulatory Commission after previous
publication, makes the following Regulations:—
REGULATIONS
1. Short title and commencement.—(1) These regulations may be called the Himachal
Pradesh Electricity Regulatory Commission (Rooftop Solar PV Grid Interactive Systems based on
Net Metering) Regulations, 2015.
(2) These regulations shall come into force from the date of their publication in the
Rajpatra, Himachal Pradesh.
2. Definitions.—In these regulations, unless the context otherwise requires;
(1) “accuracy class index” means the index as specified in the Schedule to the Central
Electricity Authority (Installation and Operation of Meters) Regulations, 2006;
(2) “Act” means the Electricity Act, 2003 (36 of 2003);
(3) “agreement” means the agreement entered into for connecting rooftop Solar PV
system to the distribution system;
(4) “applicable tariff” means the tariff applicable for supply of electricity by the licensee
to the consumer in accordance with relevant Schedule of tariff as per tariff order of the
Commission;
(5) “billing period” means the period for which regular electricity bills as specified by the
Commission, are prepared by the licensee for different categories of consumers and
2727
jkti=] fgekpy izns'k] 3 vxLr] 2015@12 Jko.k] 1937
“billing month” means includes the consecutive period of 30 days or so forming part of
billing period;
(6) “Commission” means the Himachal Pradesh Electricity Regulatory Commission;
(7) “distribution licensee” or “licensee” means a person granted a licensee under Section
14 of the Act, authorizing him to operate and maintain a distribution system for
supplying electricity to the consumers in his area of supply;
(8) “Electricity Supply Code" means the Electricity Supply Code, specified under
section 50 of the Act;
(9) “eligible consumer” means such a consumer getting supply of electricity from
distribution licensee in its area of supply, who uses or intends to use a rooftop Solar
PV system installed in his premises to offset part or all of the consumer's own
electrical requirements as per the provisions of these regulations;
(10) “financial year” or “year” means the period beginning from the first of April in an
English calendar year and ending with the thirty-first of the March of the next year;
(11) “Form” means the Form appended in these regulations ;
(12) “interconnection” means the interface of solar power generation facility system with
the network of the distribution licensee;
(13) “invoice” means either a periodic bill / supplementary bill or a periodic invoice/
supplementary invoice raised by the distribution licensee;
(14) “kWp” means kilo Watt peak;
(15) “net meter” means the meter, alongwith allied metering equipments, to be installed
and maintained by the licensee at the cost of the consumer, for reading the net import
or export of electrical energy by the consumer from/ to the distribution system and the
corresponding demand or injection;
(16) “net metering" means an arrangement under which rooftop solar system installed at
eligible consumer’s premises, delivers surplus electricity, if any, to the distribution
licensee after off-setting the electricity supplied by distribution licensee during the
applicable billing period;
(17) “Obligated Entity” means the entity mandated under clause (e) of sub-section (1) of
section 86 of the Act to fulfill the renewable purchase obligation and under Himachal
Pradesh Electricity Regulatory Commission (Renewable Power Purchase Obligation
and its Compliance) Regulations, 2010;
(18) “premises” means rooftops or/and elevated areas on the land, building or
infrastructure or part or combination thereof in respect of which a separate meter or
metering arrangements have been made by the licensee for supply of electricity;
(19) “Renewable Energy Certificate (REC)” means the certificate issued in accordance
with the procedures approved by the Central Electricity Regulatory Commission,
pursuant to Central Electricity Regulatory Commission (Terms and Conditions for
2728
jkti=] fgekpy izns'k] 3 vxLr] 2015@12 Jko.k] 1937
recognition and issuance of Renewable Energy Certificate for Renewable Energy
Generation) Regulations, 2010;
(20) “Rooftop Solar system” means the grid interactive solar photo voltaic power system,
installed on the rooftop of consumer premises that uses sunlight for direct conversion
into electricity through photo voltaic technology;
(21) “Settlement Period” means a maximum period of 12 consecutive billing months,
comprised in the billing periods, falling between 16th March of a financial year and
14th April of the next financial year, in which the solar PV system remains operative
under the net-metering arrangement.
(22) “Solar Meter” means a unidirectional energy meter, for recording the electricity
generation, installed at the point at which electricity generated by Solar Photo Voltaic
(SPV) system, is delivered to the main panel of the eligible consumer;
(23) all other words and expressions used in these regulations although not specifically
defined herein, but defined in the Act, shall have the meaning assigned to them in the
Act; the other words and expressions used herein but not specifically defined in these
regulations or in the Act but defined under any law passed by the Parliament or any
other regulations issued by the Commission, applicable to the electricity industry in the
State, shall have the meaning assigned to them in such law/regulation.
3. Scope and application.—(1) These regulations shall apply to the distribution licensee
and the eligible consumers of the distribution licensee.
(2) These regulations do not preclude the right of State authorities to undertake rooftop
solar projects of any capacities through alternative mechanisms.
4. General Principles.—Subject to the limits and other terms and conditions specified in
these regulations, the eligible consumers of the distribution licensee shall be entitled to install
rooftop solar PV system and use the power so generated at their premises. The surplus power can
be injected into the grid system.
5. Capacity of Rooftop Solar PV Systems.—(1) All eligible consumers of electricity in
the area of supply of the distribution licensee can participate in the rooftop solar net metering
arrangement, in accordance with the provisions of these regulations.
(2) The maximum peak capacity of the rooftop solar system to be installed by any
individual consumer covered under two parts tariff shall not exceed 80 % of the sanctioned contract
demand and such maximum limit incase of an individual consumer, covered under single part tariff
shall be 30% of the sanctioned connected load:
Provided that the capacity of rooftop solar PV system to be installed by an eligible
consumer shall not exceed the following limits:—
Sr.
No.
Voltage at which consumer getting
supply
Maximum Capacity of rooftop solar PV system
1.
LT (1)
5 kWp
2.
LT (3 )
15kWp
3.
HT/EHT
1 MWp
2729
jkti=] fgekpy izns'k] 3 vxLr] 2015@12 Jko.k] 1937
Provided further that the cumulative capacity to be allowed in the area, fed from a
distribution transformer or any other transformer from which power is fed to the eligible consumer,
shall not exceed 30%, or any other percentage as may be fixed by the Commission, of the rated
capacity of such transformer(s):
Provided further that in case of multiple applications from the consumers covered by a
transformer for participation in the scheme, the connectivity with the grid interactive rooftop solar
PV system shall be allowed on first come first serve basis.
6. Capacity of transformer.—The distribution licensee shall provide information on its
website regarding capacity available in different transformer(s) for feeding the eligible consumer at
different locations for connecting Rooftop Solar PV System under net metering arrangement within
3 (three) months from the date of commencement of these regulations, and shall update the same
within one month of the subsequent financial year under intimation to the Commission.
7. Procedure for making application and registration.—(1) The eligible consumer
may make the application, delivered by post or by hand or through any electronic mode such as
online submission and e-mail etc., as per Form-1, to the local office of the distribution licensee to
connect the rooftop solar system to the distribution system of the distribution licensee. The
distribution licensee shall make available format of the Form-1 on its website and also at its local
offices.
(2) The distribution licensee shall acknowledge the application and take all necessary
actions including sending appropriate communications to the applicant:
Provided that where an application is received through electronic mode, the
acknowledgment and other communication shall be served through such electronic mode also and
its hard copy shall be sent to the applicant by post or by hand delivery.
(3) After checking the feasibility, the distribution licensee shall, except for the cases
covered under sub regulation (4), issue letter of approval to the applicant within 30 days of receipt
of application. The consumer shall execute the agreement with the licensee as per Form-2 within 30
days from the date of issuance of letter of approval. The eligible consumer shall thereafter set up
rooftop solar system plant and submit the work completion report alongwith Single Line Diagram
of the synchronizing and protection arrangement issued by the plant supplier/Engineering
Procurement Construction (EPC) contractor as per relevant standards and specifications within 240
days:
Provided that the distribution licensee may modify the Net Metering Connection Agreement
Form-2 or add such conditions to it, as it may find necessary;
Provided further that the distribution licensee may, on receipt of request from the eligible
consumer, grant extension for a maximum period of 3 (three) months if it is satisfied with the
progress made by eligible consumer towards installation of rooftop solar system;
Provided further that the approval accorded to the eligible consumer shall automatically
lapse if he does not execute the agreement with the licensee within the period of 30 days as
specified under subregulation (3) or rooftop solar system is not commissioned within the permitted
period. In such cases, the eligible consumer may apply afresh for obtaining approval of the
distribution licensee which shall be dealt at par with other applications received by it in the time
frame in which such fresh application is received.
2730
jkti=] fgekpy izns'k] 3 vxLr] 2015@12 Jko.k] 1937
(4) Before any application for setting up rooftop solar plant in the area, covered under
particular distribution transformer is rejected by the distribution licensee due to any reason, the
consumer shall be served with a 15 days notice to attend to the observations and remove the
deficiencies. In case the approval cannot be granted due to non-availability of capacity, then the
application of the consumer may be considered after availability of the capacity, if the consumer
opts so.
(5) The distribution licensee on the receipt of completion report and test result etc. from
the applicant and after site verification to satisfy itself about the fulfillment of requirements for
commissioning of rooftop solar system, shall install at the cost of eligible consumer and jointly seal
the bidirectional energy meter (net meter) within 10 days and plant will be treated as commissioned
for net –metering commercial operations from the date of installation and first reading of such
meter.
(6) The eligible consumer intending to avail financial assistance may get his grid
interactive rooftop solar PV project registered with Himachal Pradesh Energy Development
Agency (HIMURJA), being a State Nodal Agency, in online mode or otherwise and HIMURJA
shall acknowledge the same within one week from the date of receipt of such request.
(7) The distribution licensee shall delegate power to local offices, at par with power
delegated for load sanction and release of connection, for purposes of procedure of these
regulations.
(8) The Commission may, if it finds it expedient to do so, revise, by order, the procedure
contained in these regulations.
8. Interconnectivity, Standards and Safety.—(1) The distribution licensee and the
eligible consumer shall ensure that—
(i) the interconnection of the rooftop solar system with the consumer installations and the
distribution system of the licensee conforms to the specifications, standards and
provisions as provided in the Central Electricity Authority (Technical Standards for
Connectivity of the Distributed Generation Resources) Regulations, 2013;
(ii) the relevant provisions of the Central Electricity Authority (Measures relating to Safety
and Electricity Supply), Regulations, 2010 are adhered to.
(2) The eligible consumer may install rooftop solar system with or without battery backup:
Provided that suitable protection shall be provided to automatically prevent the power flow
from the battery/Decentralized Generation (DG) including rooftop solar system into the grid in the
absence of grid supply. Manual isolation switch shall also be provided.
(3) The eligible consumer shall be responsible for safe operation, maintenance and
rectification of any defect of the rooftop solar system upto the point of net meter.
(4) The distribution licensee shall have the right to disconnect the rooftop solar system at
any time in the event of possible threat/damage, from such rooftop solar system to its distribution
system, to prevent an accident or damage. Subject to sub-regulation (3), the distribution licensee
may call upon the eligible consumer to rectify the defect(s) within a reasonable time.
9. Metering arrangement.—(1) The eligible consumer shall, for recording the electricity
generation, install and maintain the Solar Meter at his cost and a ;
2731
jkti=] fgekpy izns'k] 3 vxLr] 2015@12 Jko.k] 1937
(2) Net meter capable of measuring the net flows shall be installed and maintained, at the
cost of eligible consumer, by the distribution licensee and the meter shall be compliant to the
system of recording meter reading through Meter Reading Instrument (MRI) or through wireless:
Provided that if bills are prepared on the basis of MRI downloads or if meter reading is
taken on the basis of remote meter reading and the consumer wants to have a record of the reading
taken, he shall be so provided by the licensee.
(3) The meters installed as per sub-regulation (1) and (2) shall be jointly inspected and
sealed on behalf of both the parties.
(4) Not withstanding anything contained in sub-regulation (3), the meter reading taken by
the distribution licensee shall form the basis of commercial settlement.
(5) All the meters shall adhere to the standards as specified in Central Electricity Authority
(Installation and Operation of Meters) Regulations, 2006 as amended from time to time.
(6) All the meters to be installed for net metering shall be of the same or of better
Accuracy Class Index than the existing meter installed for measuring the supply of the power to the
consumer.
(7) The net meter to be installed for the eligible consumer shall be compliant to the
requirements as per the applicable tariff including those relating to Time of Day (ToD) tariff and in
case of consumer availing open access, shall also have the requisite features of special energy
meters.
10. Energy Accounting and Settlement.—(1) The accounting of electricity generated,
consumed and injected by the Rooftop Solar system under these regulations shall become effective
from the date on which the said system is treated as commissioned as per sub regulation (5) of
regulation 7 of these regulations.
(2) Billing shall be done on the basis of the net flows recorded by the Net Meter over the
billing period subject to provisions contained in the subregulation (8).
(3) In the event, the eligible consumer exports energy, on net basis, to the distribution
system during a billing period, the energy so exported on net basis, shall be carried forward in
shape of electricity credit to the immediately next billing period, forming part of the settlement
period.
(4) In the event, the eligible consumer imports energy, on net basis and after adjusting the
electricity credits if any, carried forward from the immediately preceding the billing period, from
the distribution system during a billing period, the distribution licensee shall recover energy
charges for such chargeable energy so drawn (i.e. chargeable net energy) at the applicable rates of
energy charges as per sub-regulation (9).
(5) The distribution licensee shall make payment to the eligible consumer, by way of
adjustment in the electricity bills, for the electricity credits, if any, remaining unadjusted at the end
of the settlement period, at the rates mentioned in sub-regulation (9).
(6) There shall be no carry forward of any electricity credit, pertaining to a settlement
period beyond that settlement period.
2732
jkti=] fgekpy izns'k] 3 vxLr] 2015@12 Jko.k] 1937
(7) The distribution licensee shall reflect in the bill the energy units exported or imported,
by the consumer as well as the electricity credits brought/ carried forward or adjusted as the case
may be, during the billing period and the amount payable by the eligible consumer for each
component of tariff (i.e. Energy Charges and Demand Charges etc.).
(8) In case the eligible consumer is under the ambit of time of day tariff, as determined by
the Commission from time to time, the net flows of electricity over the billing period shall be
recorded separately for the respective times of day and the energy accounting shall be carried out
separately for each Time of the Day (ToD) and the net flows during any time period, including the
electricity credit if any, shall not be adjusted against the flows or the electricity credit, pertaining to
any other time of the day even at the stage of settling the unadjusted electricity credits as per sub-
regulation (5).
Provided that in case of consumer availing open access, the energy accounting shall also be
done in accordance with open access regulations on the basis of flows and deviation for the
respective time blocks in which open access is availed and the same shall be duly accounted for
while raising bills.
(9) For the energy to be billed or settled as per the provisions under subregulation 4, 5 and
8, the distribution licensee shall raise bills or carry out necessary adjustment, as the case may be, in
the following manner and at the following rates:-
(i)
Energy Charges:—
(a) The quantum of energy for which the energy charges are to be recovered by the
distribution licensee for a billing period as per sub-regulation (4) shall be billed to the
consumer at the rate(s) of energy charges, applicable as per the applicable tariff:
Provided that where different rates of energy charges are applicable for different
times of the day (normal, peak and night hours etc.) as per the applicable tariff, the
energy accounting shall be done separately for each time of day as per sub-regulation
(8) and energy charges shall be recovered at respective rates for respective quantums
of chargeable net energy.
(b) For the quantum of energy to be settled for any time of the day at the end of the
settlement period in accordance with sub-regulation 5 and 8, the distribution licensee
shall pay, by way of adjustment of amount in future electricity bills, at a fixed rate of
Rs. 5.00 per kWh of the energy to be settled in case of consumer covered under single
part tariff and at a fixed rate Rs. 4.50 per kVAh incase of consumer covered under two
parts tariff:
Provided that the if the amount of subsidy or grant or both, available to eligible
consumer from Government agencies exceeds 50% of the capital cost of the rooftop
solar PV system, the aforesaid rates of Rs. 5.00 per kWh and Rs. 4.50 per kVAh, as
applicable, shall be reduced by 50%;
Provided further that the Commission may, by order, revise the aforesaid rates of
Rs. 5.00 per kWh and Rs. 4.50 per kVAh, as and when it finds it expedient to do so;
Provided further that in the event of revision of such rates as per the second
proviso to this sub-regulation, such revised rates shall be applicable only for such cases
in which letter of approval is yet to be issued in accordance with the provisions
contained in the regulation 7.
2733
jkti=] fgekpy izns'k] 3 vxLr] 2015@12 Jko.k] 1937
(ii)
Demand Charges:—
The licensee shall recover the demand charges, including the additional demand charges for
peak load hours and the contract demand violation charges, from the consumer as per the
provisions of applicable tariff:
Provided that actual net demand of power, drawn from the distribution system, during any
demand period (time block of 30 months or any other time block as per the tariff order) shall be
considered as the actual demand of the consumer in that demand period;
Provided further that average demand for any time of day block of the billing period shall
also be worked out on the basis of the net import, if any, of energy by the eligible consumer during
the billing period (but without adjustment of electricity credits) from the distribution system in
respect of respective times of the day over the billing period.
(iii)
Other charges:—
Any other charges as per the applicable tariff shall be charged to the consumer at par with
other consumers of similar category who are not generating any Roof Top Solar PV power under
this scheme.
(iv) The licensee shall not be required to pay any charges to the eligible consumer for any
deemed generation in case non-evacuation of power due to non-availability of grid or any such
reason.
(v) In case the applicable tariff provides for billing on kVAh basis, the net import or
export of energy and electricity credits etc. shall also be accounted in kVAh.
(vi) The distribution licensee shall, in addition to applicable tariff, also be eligible to raise
invoice for any other charges as allowed by the Commission.
(10) The distribution licensee shall also take the readings of solar meter for recording total
solar power generated by Solar PV system of consumer for its Renewable Power Purchase
Obligation (RPPO).
(11) All the rules, regulations and conditions, applicable to the consumers of the
distribution licensee for the applicable category, shall also be applicable to the eligible consumer.
11. Exemption from wheeling, banking and cross subsidy surcharge.— Subject to any
other provisions in these regulations, the Rooftop Solar PV system under net metering arrangement
shall be exempted from wheeling, banking and cross subsidy surcharge for a period of Five (5)
years, unless extended thereafter.
12. Renewable Power Purchase Obligation.—The quantum of electricity generated by
the eligible consumer under these regulations shall qualify towards compliance of Renewable
Power Purchase Obligation (RPPO) of the distribution licensee:
Provided that where the eligible consumer is himself an obligated entity, only the quantum
of electricity generated by him over and above his Renewable Power Purchase Obligation during a
quarter, shall qualify towards compliance of Renewable Power Purchase Obligation of the
distribution licensee for that quarter.
2734
jkti=] fgekpy izns'k] 3 vxLr] 2015@12 Jko.k] 1937
13. Participation under Renewable Energy Certificate Mechanism.—(1) Nothing
contained in these regulations shall apply to a Solar PV generator, intending to sell power under
Renewable Energy Certificate mechanism and he shall be free to sell power under such mechanism,
as per the provisions of the Central Electricity Regulatory Commission (Terms and Conditions for
recognition and issuance of Renewable Energy Certificate for Renewable Energy Generation)
Regulations, 2010.
(2) The eligibility for Renewable Energy Certificate and issue of such certificate for
Renewable Energy shall be as per the eligibility criteria specified under the Central Electricity
Regulatory Commission (Terms and Conditions for recognition and issuance of Renewable Energy
Certificate for Renewable Energy Generation) Regulations, 2010.
14. Penalty or Compensation.—In case of failure of net metering system, the provisions
of penalty or compensation shall be applicable as per the provisions of the Himachal Pradesh
Electricity Regulatory Commission (Distribution Performance Standards) Regulations, 2010.
15. Applicability of Other Provisions.—The provision of HP Electricity Supply Code,
HP Electricity Distribution Code, HP Grid Code and tariff orders issued by the Commission from
time to time, shall be applicable, in respect of the matters, not specifically dealt in these regulations.
16. Powers to remove difficulties.—If any difficulty arises in giving effect to any of the
provisions of these regulations, the Commission may, by a general or special order, make such
provisions not being inconsistent with the provisions of these regulations or the Act, as may appear
to be necessary or expedient for the purpose of removing the difficulties.
17. Powers to give directions.—The Commission may from time to time issue such
directions/guidelines/orders as considered appropriate for the smooth implementation of these
Regulations.
18. Powers to relax.—The Commission may by general or special order, for reasons to be
recorded in writing, may relax any of the provisions of these regulations on its own motion or on an
application made before it by an interested person.
19. Powers to amend.—Subject to the provisions of Electricity Act, 2003, the
Commission may, from time to time, add, vary, alter, suspend, modify, amend or repeal any
provisions of these regulations.
By order of the Commission
Sd/-
Secretary.
_________
Form-1
[see sub-regulation (1) of regulation 7]
Net Metering Application
To
Designated Officer*
(Name of office)
Date:
2735
jkti=] fgekpy izns'k] 3 vxLr] 2015@12 Jko.k] 1937
I/we herewith apply for a solar energy net- metering connection at the service connection
and for the Rooftop Solar PV Plant of which details are given below.
1. Name of applicant
2. Address of applicant
3. K-Number (A/C No.)
4. Sanctioned Contract Demand(kVA)
5. Applicable tariff / Category
6. Telephone number(s)
7. Email ID
8. Rooftop Solar PV Plant Capacity (kWp)
9. Solar grid inverter make and type
10. Solar
grid
inverter
has
automatic
isolation protection (Y/N)
11. Has a Solar Generation Energy Meter
been installed (Y/N)
12. Expected date of commissioning of Solar
PV System
* For Designated Officer please refer Regulation 7 (7).
Name:
Signature:
------------------------------------------------------------------------------------------------------------------------
Net Metering Application Acknowledgement
Received an application for a solar energy net – metering connection from,
Name.
Date:
K-Number (A/C No.)
Application registration no.:
Solar Plant Capacity
Name of Officer
Signature
Designation/ Distribution Licensees
__________
FORM-2
[see sub-regulation (1) of regulation 7]
Net Metering Connection Agreement
This Agreement is made and entered into at (location)…………..on this (date)…….day of
(month)………. Between ……………………………………… who is a consumer of the
distribution licensee with sanctioned contract demand of………. kVA at ………… and intends to
install Rooftop Solar PV Grid Interactive System at his premises ….................................…………..
(address)……………………………… as First party, and.………………………. distribution
Licensee (herein after called as……… (Name of Discom) ………………. and having its registered
office at……………….(address)…………… as Second party of the agreement.
2736
jkti=] fgekpy izns'k] 3 vxLr] 2015@12 Jko.k] 1937
And whereas, the ……………………(Name of Discom)………..agrees to facilitate the
Rooftop Solar PV Energy Generator for the electricity generated from his Rooftop Solar PV Grid
Interactive System of capacity……….watts and as per conditions of this agreement and net-
metering regulations/ orders issued by the Himachal Pradesh Electricity Regulatory Commission.
Both the party hereby agrees to as follows:
1.
Eligibility
1.1 Eligibility for net- metering shall be as specified in the Himachal Pradesh Electricity
Regulatory Commission (Rooftop Solar PV Grid Interactive System based on Net
Metering) Regulations, 2015. First Party is required to be aware, in advance, of the
standards and conditions his system has to meet, for being integrated into
grid/distribution system.
2.
Technical and Interconnection Requirements
2.1 First Party agrees that his Solar PV generation plant and net- metering system will
conform to the Standards and requirements mentioned in the following Regulations,
codes and any other relevant provisions and also that he shall be continued to be
governed by all such regulations, codes and other relevant provisions.—
(i)
the Central Electricity Authority (Technical Standards for connectivity of the
Distributed Generating Resources) Regulations, 2013;
(ii) the Central Electricity Authority (Installation and Operation of Meters)
Regulation 2006;
(iii) the Himachal Pradesh Electricity Distribution Code, 2008;
(iv) the Himachal Pradesh Electricity Supply Code, 2009;
(v) any other provisions applicable to the electricity consumer of the distribution
licensee.
2.2 First Party agrees that he has installed or will install, prior to connection of
Photovoltaic System to Second Party’s distribution system, an isolation device (both
automatic and inbuilt within inverter in case of Solar PV Generation and external
manual relays) and agrees for the Second Party to have access to and operation of this,
if required and for repair …… (Name of Discom)………………………………and
maintenance of the distribution system.
2.3 First Party agrees that in case of a power outage on Second Party’s system,
Photovoltaic System will shut down, automatically and his plant will not inject power
into Licensee’s distribution system.
2.4 All the equipment connected to distribution system must be compliant with relevant
international (IEEE/IEC) or Indian standards (BIS) and installations of electrical
equipment must comply with the Central Electricity Authority (Measures of Safety and
Electricity Supply) Regulations, 2010.
2.5 First Party agrees that licensee will specify the interface/interconnection point and
metering point.
2737
jkti=] fgekpy izns'k] 3 vxLr] 2015@12 Jko.k] 1937
2.6 First Party and Second Party agrees to comply with the relevant CEA regulations in
respect of operation and maintenance of the plant, drawing and diagrams, site
responsibility schedule, harmonics, synchronization, voltage frequency, flicker etc.
2.7 Due to Second Party obligation to maintain a safe and reliable distribution system,
eligible consumer agrees that if is it determined by the Second Party that First Party’s
Photovoltaic System either caused damage to and/or produces adverse effects affecting
other consumers or Second Party’s assets, First Party will have to disconnect
Photovoltaic System immediately from the distribution system upon direction from the
Second Party and correct the problem at his own expense prior to a reconnection.
3.
Clearances and Approvals
3.1 First Party agrees to obtain all the necessary approvals and clearances (environmental
and grid connection related) before connecting the Photovoltaic System to the
distribution system.
4.
Access and Disconnection
4.1 Second Party shall have access to metering equipment and disconnecting means of
Photovoltaic System, both automatic and manual, at all times.
4.2 In emergency or outage situation, where there is no access to a disconnecting means,
both automatic and manual, such as a switch or breaker, Second Party may disconnect
service to the premise.
5.
Liabilities
5.1 First Party and Second Party will indemnify each other for damages or adverse effect
from either party’s negligence or intentional misconduct in the connection and
operation of Photovoltaic System or Second Party distribution system.
5.2 Second Party and First Party will not be liable to each other for any loss of profits or
revenues, business interruption losses, loss of contract or loss of goodwill, or for
indirect, consequential incidental or special damages, including, but not limited to,
punitive or exemplary damages, whether any of the said liability, loss or damages arise
in contract, or otherwise.
5.3 Second Party shall not be liable for delivery or realization by First Party for any fiscal
or other incentive provided by the Central/State Government beyond the scope
specified by the Commission in its relevant order.
6.
Commercial Settlement
6.1 All the commercial settlement under this agreement shall follow the Net –Metering
Regulations and relevant Orders of Himachal Pradesh Electricity Regulatory Commission.
7.
Connection Costs
7.1 The First Party shall bear all costs related to setting up of Photovoltaic System
including metering and interconnection costs. The First Party agrees to pay the actual
cost of modifications and upgrades to the service line required to connect Photovoltaic
System is case it is required.
2738
jkti=] fgekpy izns'k] 3 vxLr] 2015@12 Jko.k] 1937
8.
Termination
8.1 The First Party can terminate agreement at any time by providing Second Party with 90
days prior notice.
8.2 Second Party has the right to terminate Agreement on 30 days prior written notice, if
eligible consumer breaches a term of this Agreement and does not remedy the breach
within 30 days of receiving written notice from Second Party of the breach
8.3 First Party agrees that upon termination of this Agreement, he must disconnect the
Photovoltaic System from Second Party’s distribution system in a timely manner and
to Second Party’s satisfaction.
In the witness, whereof of Mr………..for and on behalf of First Party and Mr……….for
and on behalf of Second Party sign this agreement in two originals.
First Party
Second Party
Name
Name
Address
Designation
K-Number (A/C No.) of consumer Office Address
Discom :- Distribution Licensee of the area.
__________
SOCIAL JUSTICE & EMPOWERMENT DEPARTMENT (B)
NOTIFICATION
Shimla-171002, the 20th July, 2015
No: SJE-B-A(8)-2/2013.—In partial modification of this Department Notification No:SJE-
BA(3)1/2006 dated 2nd August, 2012 the Governor, Himachal Pradesh is pleased to enhance the
payment of compensation, relief and rehabilitation to the Scheduled Castes and Scheduled Tribes,
who are the victims of atrocities as provided in the said rule as per the Schedule Annexure-I
attached herewith.
2. The expenditure on this account shall be debited to the Major Head"2225-Social
Security and Welfare of Scheduled Castes and Scheduled Tribes".
3. This issues with the prior concurrence of the Finance Department obtained vide their
U.O. letter No: Fin( C)A(3)-6/98 dated 5-6-2015.
By order,
ANURADHA THAKUR
Secretary (SJE).
2739
jkti=] fgekpy izns'k] 3 vxLr] 2015@12 Jko.k] 1937
ANNEXURE-I
(See rule 12 (4)
NORMS FOR RELIEF AMOUNT
Sl.
No.
Name of the Offences
Minimum amount of Relief
1.
Drink
or
eat
inedible
or
obnoxious substance (section 3
(1)(i)
Rs. 90,000/- or more depending upon the nature and
gravity of the offence to each victim and also
commensurate with the indignity insult, injury and
defamation suffered by the victim.
Payment to be made as follows:
I. 25% when the charge sheet is sent to the Court
II. 75% when accused are convicted by the lower Court.
2.
Causing injury insult or
annoyance (section 3 (1)(ii)
3.
Derogatory act (section
3(1)(iii)
4.
Wrongful
occupation
or
cultivation of land, etc. (section
3(1)(iv)
At least Rs.90,000/- or more depending upon the nature
and gravity of the offence. The land/premises/water
supply shall be restored where necessary at Government
cost, full payment to be made when chargesheet is sent
to the court.
5.
Relating to land, premises and
water (section 3(1)(v)
6.
Begar or forced or bonded
labour (section 3(1)(vi)
At least Rs. 90,000/- to each victim, payment of 25% at
FIR stage and 75% on conviction in the lower Court.
7.
Relating to right to franchise
(section 3(1)(vii)
Up to Rs. 75,000/- to each victim depending upon the
nature and gravity of the offence.
8.
False, malicious or vexatious
legal
proceedings
(section
3
(1)(viii)
Rs. 90,000/- or reimbursement of actual legal expenses
and damages or whichever is less after conclusion of
the trail of the accused.
9.
False and frivolous information
section 3(1)(ix)
10.
Insult,
intimidation
and
humiliation (section 3(1)(x)
Up to Rs. 90,000/- to each victim depending upon the
nature of the offence. Payment of 25% when charge-
sheet is sent to the court and rest on conviction.
11.
Outraging the modesty of a
women (section 3(1)(xi)
Rs.1,80,000/- to each victim of the offence 50 % of the
amount may be paid after medical examination and
remaining 50% at the conclusion of the trail.
12.
Sexual exploitation of a women
(section 3(1)(xii)
13.
Fouling
of
water
(section
3(1)(xiii)
Up to Rs. 3,75,000/- or full cost of restoration of normal
facility, including cleaning when the water is fouled.
Payment may be made at the stage as deemed fit by
District Administration.
14.
Denial of customary rights of
passage (section 3(1) (xiv)
Up to Rs. 3,75,000/- or full cost of restoration of right
of passage and full compensation of the loss suffered, if
any. Payment of 50% when charge sheet is sent to the
court and 50% on conviction in lower Court.
2740
jkti=] fgekpy izns'k] 3 vxLr] 2015@12 Jko.k] 1937
15.
Making one desert place of
residence (section 3(1)(xv)
Restoration of the site/right to stay and compensation of
Rs. 90,000/- to each victim and reconstruction of the
house at Government cost, if destroyed, To be paid in
full when charge sheet is sent to the lower Court.
16.
Giving false evidence (section
3(2)(i) and (ii)
At least Rs. 3,75,000/- or full compensation of the loss
or harm sustained. 50% to be paid when charge sheet is
sent to Court and 50% on conviction by the lower Court
17.
Committing offences under the
Indian Penal Code punishable
with imprisonment for a term of
10 years or more (section 3(2)
At least Rs.1,80,000/- depending upon the nature and
gravity of the offence to each victim and or his
dependents. The amount would vary if specifically
otherwise provided in the schedule.
18.
Victimization at the hands of a
public servant (section 3(2)(vii).
Same as the compensation payable, if the accused was
not a public servant.
19.
Disability: The definition of
disability shall be as given in
section 2 of the Persons with
Disabilities (Equal Opportunities,
Protection of Rights and Full
Participation) Act, 1955, and
guidelines for their assessment
shall be as contained in the
Ministry of Social Justice &
Empowerment,
G.O.I
Notification
No.
154,
dated
1-6-2001, as amended from time
to
time.
A
copy
of
the
Notification
is
at-II
to
the
Schedule.
(a) 100% incapacitation.
(i) Non-earning Member of a
family.
(ii) Earning Member of a family.
(b) Where incapacitation is less
than 100%.
At least Rs. 3,75,000/- to each victim of offence. 50 %
on FIR and 25 % at charge sheet and 25 % on
conviction by the lower Court.
At least Rs. 7,50,000/- to each victim of offence, 50 %
to be paid on FIR/Medical examination stage, 25 %
when charge-sheet sent to Court and 25 % at conviction
in lower Court.
Provided that an amount of not less than Rs. 60,000/-
from the amount payable to non-earning member of a
family and an amount of not less than Rs. 1,20,000/-
from the amount payable to an earning member of a
family may be reduced.
2741
jkti=] fgekpy izns'k] 3 vxLr] 2015@12 Jko.k] 1937
20.
Murder/Death
(a) Non-earning Member of a
family
(b) Earning Member of a family
At least Rs. 3,75,000/- to each case. Payment of 75 %
after postmortem and 25% on conviction by the lower
Court.
At least Rs.7,50,000/- to each case. Payment of 75%
after postmortem and 25% on conviction by the lower
Court.
21.
Victim
of
murder,
death,
massacre, rape mass rape and
gang
rape,
permanent
incapacitation and diacoity.
In addition to relief amounts paid under above items,
relief may be arranged within three months of date of
atrocity as follows:
(i) Pension to each widow and /or other dependents of
deceased SC and ST Rs. 4,500/- per month, or
Employment to one member of the family of the
deceased, or provision of agricultural land, an house, if
necessary by outright purchase.
(ii) Full cost of the education and maintenance of the
children of the victims. Children may be admitted to
Ashram Schools/residential schools.
(iii) Provision of utensils, rice, wheat, dals, pulses ets,
for a period of three months.
22.
Complete
destruction/
burnt
houses
Brick/stone masonry houses to be constructed or
provided at Government cost where it has been burnt or
destroyed.
________
In the court of Hem Chand Kashyap Assistant Collector IInd Grade Darlaghat,
District Solan H.P.
fely ua0 03@13-A of 2015
eqdnek cuke Shri Mahender Singh s/o Shri Bhandaru Ram, r/o Village Passal-Jeri, Sub-Tehsil
Darlaghat, District Solan HP.
Versus
General Public
izkFkZuk i= uke n#LrhA
b'rgkj cuke vke turkA
izkFkhZ Jh Shri Mahender Singh s/o Shri Bhandaru Ram, r/o Village Passal-Jeri, Sub-Tehsil
Darlaghat us bl U;k;ky; esa izkFkZuk i= fn;k gS fd mldk uke jktLo fjdkMZ iVokj o`r Dhundan esa
Shri Mahender Singh s/o Shri Bhandaru Ram pyk vk jgk gS tks fd xyr gSA izkFkhZ us izek.k esa Copy
of Parivar Register, Affidavit, Copy of Jamabandi, Copy of Adhar Card, Voter Card and Copy of
Ration Card Hkh izLrqr fd;k gSA bl uke dh n#Lrh ckjs gj vke o [kkl dks bl b'rgkj }kjk lwfpr
2742
jkti=] fgekpy izns'k] 3 vxLr] 2015@12 Jko.k] 1937
fd;k tkrk gS fd ;fn bl uke dh n#Lrh esa fdlh dks mtj ;k ,rjkt gks rks os bl U;k;ky; esa
fnukad 29&08&2015 dks izkr% 10-00 cts vlkyru ;k odkyru gkftj vkdj viuk ,rjkt ;k vlgefr
izdV dj ldrs gSaA mDr frfFk ds Ik'pkr dksbZ Hkh mtj ;k ,rjkt dkcys lek;r u gksxk rFkk uke
n#Lrh ds vkns'k ikfjr dj fn, tk,axsA
vkt fnukad 28&07&2015 dks gekjs gLrk{kj rFkk eksgj vnkyr ls tkjh gqvkA
eksgjA
gLrk{kfjr@&
lgk;d lekgrkZ f}rh; oxZ]
nkM+yk?kkV] rglhy vdhZ] ftyk lksyu ¼fg0 iz0½A
&&&&&&&&
Before the Executive Magistrate cum Tehsildar Solan, District Solan, H. P.
In the matter of :-
Smt. Shanta Sharma w/o Late Shri Ganesh Dutt Sharma, r/o Ganesh Niwas, H. No. 41,
Ward No.11, Near Forest Corporation, Kotlanala, Solan, Tehsil & District Solan, Himachal Pradesh
. . Applicant.
Versus
General Public
. . Respondent.
NOTICE
Whereas Smt. Shanta Sharma w/o Late Shri Ganesh Dutt Sharma, r/o Ganesh Niwas,
H. No. 41, Ward No. 11, Near Forest Corporation, Kotlanala, Solan, Tehsil & District Solan,
Himachal Pradesh has submitted an application before the undersigned for allowing her to enter
the date of birth i.e. 06-01-1991 of her son named Prateek Sharma s/o Late Shri Ganesh Dutt
Sharma in the record of Municipal Council Solan, Tehsil & District Solan, as his date of birth has
not been entered in the record of Municipal Council Solan, Tehsil and District Solan.
The general public of the concerned area is hereby called upon to file objections, if any, in
the office of undersigned regarding entering the date of birth i.e. 6-1-1991 of Prateek Sharma s/o
Late Shri Ganesh Dutt Sharma in the record of Municipal Council Solan, Tehsil & District Solan,
The objections should reach in this office on or before 27th August, 2015 positively; otherwise
necessary order will be passed to enter the date of birth of Prateek Sharma s/o Late Shri Ganesh
Dutt Sharma in the record of Municipal Council Solan, Tehsil & District Solan.
Seal.
Sd/-
Executive Magistrate,
Solan, District Solan, H. P.
fu;U=d] eqnz.k rFkk ys[ku lkexzh] fgekpy izns'k] f'keyk&5 }kjk eqfnzr rFkk izdkf'kr
bysDVªkWfud gLrk{kfjr jkti=] oSclkbV http://rajpatrahimachal.nic.in ij miyC/k gS ,oe~ vkWuykbu lR;kfir fd;k tk ldrk gS