jkti=] fgekpy izns'k

fgekpy izns'k jkT; 'kklu }kjk izdkf'kr

'kfuokj] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939

fgekpy izns'k ljdkj

TRANSPORT DEPARTMENT

NOTIFICATION

Shimla-02, the 21st November 2017

No. TPT-E(3)-57/2017.—The Governor, Himachal Pradesh in exercise of the powers

conferred by sub section 14(3) of the Himachal Pradesh Motor Vehicle Taxation Act, 1972 (Act

No:4 of 1973) and all other powers enabling him in this behalf is pleased to exempt the vehicle No.

HP- 25-A-1815 which is registered in the name of Sh. Raj Kumar S/o Lakhi Ram, VPO and Tehsil

Morang, Distt. Kinnour, Himachal Pradesh from the payment of Special Road Tax and Token Tax

180&jkti=@2017&02&12&2017

¼8359½

8360

jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939

leviable under Section-3 of the Himachal Pradesh Motor Vehicle Taxation Act, 1972 with effect

from 16-10-2007 to 21-09- 2017 as the vehicle in question is off road during this period.

By order,

SANJAY GUPTA,

Principal Secretary (Transport).

____________

TRANSPORT DEPARTMENT

NOTIFICATION

Shimla-02, the 1st December 2017

No.TPT-C(9)-4/2017-loose.—The Governor, Himachal Pradesh in exercise of the powers

conferred by sub section (6) of Section-41 of the Motor Vehicles Act, 1988 (No.59 of 1988) and all

other powers enabling him in this behalf is pleased to allot /release registration marks/number from

Serial No.0001 to 9999 under the Registration marks HP-96 to Registering & Licensing Authority

Dheera, District Kangra, Himachal Pradesh for registration of motor vehicles with immediate

effect.

By order,

SANJAY GUPTA,

Principal Secretary (Transport.)

&&&&&&&&&&

[AUTHORITATIVE ENGLISH TEXT OF THIS DEPARTMENT NOTIFICATION No. TCP-F(5)-

6/2017 SHIMLA, DATED 12-9-2017 AS REQUIRED UNDER CLAUSE (3) OF ARTICLE 348 OF

THE CONSTITUTION OF INDIA].

TOWN AND COUNTRY PLANNING DEPARTMENT

NOTIFICATION

Shimla-2, 12th September, 2017

No.TCP-F(5)-6/2017.—WHEREAS, the draft Development Plan for Nadaun Planning

Area was published by the Director, Town and Country Planning Department, Himachal Pradesh,

Shimla under sub-section (1) of section 19 of the Town and Country Planning Act, 1977 (Act No.

12 of 1977) read with rule 11 of the Himachal Pradesh Town and Country Planning Rule 2014 vide

Notice No. HIM/TP/PJT/D.P.Nadaun/2004/Vol-II/12-30 dated 01.04.2017 published in the Rajptra,

Himachal Pradesh on 20.05.2017 for inviting objection(s) and suggestions(s), which were duly

considered and the draft Development Plan was submitted to the Government for approval.

NOW THEREFORE, in exercise of the powers vested under subsection (1) of section 20 of

the Himachal Pradesh Town and Country Planning Act, 1977 (Act No.12 of 1977), the Governor,

Himachal Pradesh is pleased to approve the Development Plan for Nadaun Planning Area, without

any modifications and the same is hereby published in the Official Gazette of Himachal Pradesh as

8361

jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939

required under sub-section (4) of section 20 of the Act ibid. A Notice is hereby given that a copy of

the said Development Plan is available for inspection during office hours in the following

offices:—

1.

The Director,

Town and Country Planning Department,

Nagar Yojana Bhawan, Block No.32-A, Vikas Nagar,

Kasumpti, Shimla, Himachal Pradesh-171009.

2.

The Towm and Country Planner,

Divisional Town Planning Office,

Hamirpur, Himachal Pradesh.

3.

The Planning Officer

Town Planning Office,

Nadaun, District Hamirpur, Himachal Pradesh.

4.

The Secretary,

Nagar Panchayat, Nadaun,

District Hamirpur, Himachal Pradesh.

The said Development Plan shall come into operation from the date of publication of this

Notification in the Official Gazette in terms of subsection (5) of section 20 of the Act ibid and shall

be binding on all Development Authorities constituted under the said Act and all local authorities

functioning within the Nadaun Planning Area.

By order,

MANISHA NANDA,

Additional Chief Secretary (TCP).

________

uxj ,oa xzke ;kstuk foHkkx

vf/klwpuk

f'keyk&2] 12 uoEcj] 2017

la[;k- Vh0lh0ih0&,Q¼5½&6@2017-&&uknkSu ;kstuk {ks= ds fy, fodkl ;kstuk ds izk:Ik dks

fgekpy izns'k uxj vkSj xzke ;kstuk fu;e] 2014 ds fu;e 11 ds lkFk ifBr fgekpy izns”k uxj vkSj

xzke ;kstuk vf/kfu;e] 1977 (1977 dk vf/kfu;e la[;kad 12) dh /kkjk 19 dh mi/kkjk (1) ds v/khu]

vk{ksi ¼iksa½ vkSj lq>ko ¼oksa½ dks vkeaf=r djus ds fy, funs'kd] uxj ,oa xzke ;kstuk foHkkx] fgekpy

izns'k }kjk uksfVl la[;k fge@Vhlhih@ihtsVh@Mh-ih-uknkSu@2004@oksY;we&II@12&30 rkjh[k

01&04&2017 }kjk jkti=] fgekpy izns'k esa rkjh[k 20&05&2017 dks izdkf'kr fd;k x;k Fkk ftu ij

lE;d~ :Ik ls fopkj fd;k x;k vkSj fodkl ;kstuk ljdkj ds izk:Ik dks vuqeksnu ds fy, izLrr fd;k

x;kA

vr% fgekpy izns”k ds jkT;iky] fgekpy izns”k uxj vkSj xzke ;kstuk vf/kfu;e] 1977 (1977 dk

vf/kfu;e la[;kad 12) dh /kkjk 20 dh mi/kkjk (1) ds v/khu fufgr 'kfDr;ksa dk iz;ksx djrs gq,] uknkSu

;kstuk {ks= ds fy, fodkl ;kstuk dks fcuk fdlh mikUrj.k ds vuqeksfnr djrs gSa vkSj bls iwoksZDr

vf/kfu;e dh /kkjk 20 dh mi/kkjk ¼4½ ds v/khu ;Fkk visf{kr ds vuqlkj jkti=] fgekpy izns'k esa

,rn~}kjk izdkf'kr fd;k tkrk gSA ,rn~}kjk uksfVl fn;k tkrk gS fd mDr fodkl ;kstuk dh ,d izfr

fujh{k.k gsrq fuEufyf[kr dk;kZy;ksa esa dk;kZy; le; ds nkSjku miyC/k jgsxh] vFkkZr~%&

8362

jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939

1- funs'kd]

uxj ,oa xzke ;kstuk foHkkx]

uxj ;kstuk Hkou] Cykd u0 32&,

dLkqEiVh] f'keyk] fgekpy izns'k&171009-

2- uxj ,oa xzke ;kstukdkj]

e.Myh; uxj ;kstuk dk;kZy;]

gehjiqj] fgekpy izns'kA

3- ;kstuk vf/kdkjh]

uxj ,oa xzke ;kstuk dk;kZy;]

uknkSu] ftyk gehjiqj] fgekpy izns'k A

4- lfpo]

Ukxj iapk;r uknkSu]

ftyk gehjiqj] fgekpy izns'k A

mDr fodkl ;kstuk] iwoksZDr vf/kfu;e dh /kkjk 20 dh mi/kkjk ¼5½ ds fucU/kuksa ds vuqlkj bl

vf/klwpuk ds jkti= esa izdk'ku dh rkjh[k ls izorZu esa vk,xh vkSj mDr vf/kfu;e ds v/khu xfBr

leLr fodkl izkf/kdj.kksa rFkk uknkSu ;kstuk {ks= ds Hkhrj fØ;k'khy leLr izkf/kdj.kksa ds fy, vkc}dj

gksxhA

vkns”k }kjk]

Ekuh’kk uUnk]

vfrfjDr eq[; lfpo (Vh0lh0ih0)

&&&&&&&&

[AUTHORITATIVE ENGLISH TEXT OF THIS DEPARTMENT NOTIFICATION No. TCP-F(5)-

5/2017 SHIMLA, DATED 12-9-2017 AS REQUIRED UNDER CLAUSE (3) OF ARTICLE 348 OF

THE CONSTITUTION OF INDIA].

TOWN AND COUNTRY PLANNING DEPARTMENT

NOTIFICATION

Shimla-2, 12th September,2017

No.TCP-F(5)-5/2016.—WHEREAS, the draft Development Plan for Dharamshala

Planning Area was published by the Director, Town and Country Planning Department, Himachal

Pradesh, Shimla under sub-section (1) of section 19 of the Town and Country Planning Act, 1977

(Act No. 12 of 1977) read with rule 11 of the Himachal Pradesh Town and Country Planning Rules,

2014 vide Notice No. HIM/TP/PJT/D.P. Dharamshala/2013/Vol-III/103-20 dated 01.04.2017

published in the Rajpatra, Himachal Pradesh on 21.04.2017 for inviting objection(s) and

suggestion(s), which were duly considered and the draft Development Plan was submitted to the

Government for approval.

Now THEREFORE, in exercise of the powers vested under sub-section (1) of section 20 of

the Himachal Pradesh Town and Country Planning Act, 1977 (Act No.12 of 1977), the Governor,

Himachal Pradesh is pleased to approve the Development Plan for Dharamshala Planning Area,

8363

jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939

without modifications and the same is hereby published in the Official Gazette of Himachal

Pradesh as required under sub-section (4) of section 20 of the Act ibid. A Notice is hereby given

that a copy of the said Development Plan is available for inspection during office hours in the

following offices, namely:—

1. The Director,

Town and Country Planning Department,

Nagar Yojana Bhawan, Block No. 32-A, Vikas Nagar,

Kasumpati, Shimla, Himachal Pradesh-171009.

2. The Town and Country Planner,

Divisional Town Planning Office, Dharamshala

District Kangra, Himachal Pradesh.

3. The Commissioner,

Municipal Corporation, Dharamshala,

District Kangra, Himachal Pradesh.

The said Development Plan shall come into operation from the date of publication of this

Notification in the Official Gazette of Himachal Pradesh.

By order,

MANISHA NANDA

Addl. Chief Secretary (TCP).

__________

uxj ,oa xzke ;kstuk foHkkx

vf/klwpuk

f'keyk&2] 12 uoEcj] 2017

la[;k- Vh0lh0ih0&,Q¼5½&5@2017-&&/keZ'kkyk ;kstuk {ks= ds fy, fodkl ;kstuk ds izk:Ik dks]

fgekpy izns”k uxj vkSj xzke ;kstuk fu;e] 2014 ds fu;e 11 ds lkFk ifBr fgekpy izns'k uxj vkSj

xzke ;kstuk vf/kfu;e] 1977 (1977 dk vf/kfu;e la[;kad 12) dh /kkjk 19 dh mi/kkjk (1) ds v/khu

vk{ksi ¼iksa½ vkSj lq>ko ¼oksa½ dks vkeaf=r djus ds fy, funs'kd] uxj ,oa ;kstuk foHkkx] fgekpy izns'k

}kjk] uksfVl la[;k% fge@Vhih@ihtsVh@Mh-ih- /keZ'kkyk@2013@oksY;we&III@103-20 rkjh[k 01&04-2017

}kjk] jkti=] fgekpy izns'k esa rkjh[k 21 vizSy] 2017 dks izdkf'kr fd;k x;k Fkk ftl ij lE;d~ :Ik ls

fopkj fd;k x;k vkSj fodkl ;kstuk ds izk:Ik dks ljdkj dks vuqeksnu ds fy, izLrqr fd;k x;kA

vr% fgekpy izns”k ds jkT;iky] fgekpy izns'k uxj vkSj xzke ;kstuk vf/kfu;e] 1977 (1977 dk

vf/kfu;e la[;kad 12) dh /kkjk 20 dh mi/kkjk (1) ds v/khu fufgr 'kfDr;ksa dk iz;ksx djrs gq,]

/keZ'kkyk ;kstuk {ks= ds fy, fodkl ;kstuk dks fcuk fdlh mikUrj.k ds vuqeksfnr djrs gSa vkSj bls

iwoksZDr vf/kfu;e dh /kkjk 20 dh mi/kkjk ¼4½ ds v/khu ;Fkk visf{kr ds vuqlkj jkti=] fgekpy izns'k esa

,rn~}kjk izdkf'kr fd;k tkrk gSA ,rn~}kjk uksfVl fn;k tkrk gS fd mDr fodkl ;kstuk dh ,d izfr

fujh{k.k gsrq fuEufyf[kr dk;kZy;ksa esa dk;kZy; le; ds nkSjku miyC/k jgsxh] vFkkZr%&

8364

jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939

1- funs'kd]

uxj ,oa xzke ;kstuk foHkkx]

uxj ;kstuk Hkou] Cykd u0 32&,]

dLkqEiVh] f'keyk] fgekpy izns'k&171009-

2- uxj xzke ;kstukdkj]

e.Myh; uxj ;kstuk dk;kZy;] /keZ'kkyk]

ftyk dkaxM+k] fgekpy izns'k A

3- vk;qDr]

Ukxj fuxe] /keZ'kkyk] ftyk dkaxM+k

fgekpy izns'k A

mDr fodkl ;kstuk bl vf/klwpuk ds jkti= fgekpy izns'k esa izdk'ku dh rkjh[k ls izorZu

vk,xhA

vkns”k }kjk]

Ekuh’kk uUnk]

vfrfjDr eq[; lfpo (Vh0lh0ih0)A

_____________

DEVELOPMENT PLAN

NADAUN PLANNING AREA

DISTRICT HAMIRPUR,

HIMACHAL PRADESH

Prepared By:

Town and Country Planning Department

Government of Himachal Pradesh

Mission: Shaping Tomorrow

Consultant:

Voyants Solutions Pvt. Ltd., Gurugram

8365

jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939

ANNEXURES

Annexure 1

Twelveth Schedule of the 74th Consitutional Amendment

Annexure 2

Khasras falling in Steep Slopes

Annexure 3

Traffic Projections

Annexure 4

Broad Cost Estimates

Annexure 5

Sample Layout Plan for 30 sq.m. Row Housing Building

List of Tables

Table 2-1: Notified Planning Area of Nadaun

Table 2-2: Terrain Analysis

Table 2-3: Slope Analysis

Table 3-1: Urban settlement pattern in Hamirpur District

Table 3-2: Population Distribution of Nadaun Planning Area

Table 3-3: Distribution of Settlements by Population Size, 2011

Table 3-4: Population Distribution in Nadaun Planning Area

Table 3-5: Population Projections for Nadaun Planning Area by five different methods

Table 3-6: Proposed Growth Centre in NPA

Table 3-7: Proposed Settlement Hierarchy and Proposed Facilities in Nadaun Planning Area - 2035

Table 4-1: Occupational Structure of Nadaun

Table 4-2: Production of Horticultural Crops

Table.4-3: Proposed Occupational Classification of Nadaun

Table 5-1: Year wise population in the Planning Area

Table 5-2: Housing Forecast

Table 5-3: Year wise Housing Need

Table 5-4: Proposed Distribution of Households by Housing Category

Table 5-5: Distribution of Housing by Supply Agencies

Table 6-1: Village Roads, Nadaun Planning Area

Table 6-2: Roads Maintained by Nagar Panchayat

Table 6-3: Level of Service in terms of Traffic Volume

Table 6-4: Level of Service Criteria

Table 7-1: Projected Distribution of Hotels and Beds

Table 8-1: Future demand for Educational Institutes

Table 8-2: Future demand for Healthcare Facilities

Table 8-3 Future demand for postal services

Table 8-4 Future requirement for security facilities

Table 8-5 Future demand for other community facilities

Table 8-6 Future demand for recreational facilities

Table 8-7 Future demand for sports facilities

Table 9-1: Water Demand and Gap

Table 9-2: Water Treatment Demand

Table 9-3: Service Level Benchmarking for Water Supply System (2016-2035)

Table 9-4: Sewerage Generation and Gap

Table 9-5: Service Level Benchmarking for Sewerage and Sanitation (2016-2035)

Table 9-6: Solid Waste Generation and Gap

Table 9-7: Service Level Benchmarking for Solid Waste Management (2016-2035)

Table 9-8: Details of existing power infrastructure

Table 9-9: Technical Details of Road Lighting System

Table 9-10: Telecommunication Connections, 2035

Table 10-1 Water Quality Monitored in between Dhera Bridge and Nadaun Bridge

Table 10-2: Type of disasters in Hamirpur District

Table 10-3: Ground Water Quality, Hamirpur District

Table 11-1 Local Level Steering Group

8366

jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939

Table 13-1: Area allocation for various facilities zone-wise

Table 14-1: Land use Distribution, 2016

Table 14-2: Proposed Land Use Classification, 2035

Table 14-3: Land use Distribution, 2035

Table 15-1: Summary of Infrastructure Cost

Table 15-2: Phase-wise costing

Table 16-1: Components of Nadaun Planning Area

Table 16-2: Colouring of Plans

Table 16-3: Clearances from Electric Supply Lines

Table 16-4: Residential Building Regulations shall be applicable in Nadaun Planning Area

Table 16-5: For Industrial Uses

Table 16-6: Standards for building lines and control lines for Plain and Rolling terrain for Built-up area

Table 16-7: Risk Based Classification of Buildings for Nadaun Planning Area

List of Figures

Figure 2-1: Location of the Planning Area

Figure 2-2: Nadaun Planning Area, Hamirpur

Figure 2-3: Administrative set up in Planning Area

Figure 4-4: Regional Connectivity of Nadaun

Figure 2-5: Historical Evolution of Nadaun Town

Figure 2-6: Elevation Analysis - Nadaun Planning Area

Figure 2-7: Slope in the Planning Area

Figure 3-3: Growth Rate of Nadaun Planning Area

Figure 3-4: Age-Sex Composition

Figure 3-5: SC distribution in Planning Area

Figure 3-6: Literacy rate in Nadaun Planning Area

Figure 3-7: Population Projections for Nadaun Planning area by five different methods

Figure 3-8: Proposed Settlement Pattern

Figure 4-1: Workers Distribution

Figure 4-2: Agricultural Area in Nadaun Planning Area

Figure 4-3: Share of Activities in Tertiary Sector

Figure 4-4: Occupation Structure of Employed People

Figure 4-5: Income Structure

Figure 5-1: Settlements in the Planning Area

Figure 5-2: Condition of Houses

Figure 5-3 Age of Structure in Nadaun Planning Area

Figure 5-4: Type of Structures

Figure 5-5: Material of Roof

Figure 5-6 Material of Floor

Figure 5-7: Material of Wall

Figure 5-8: Dwelling Unit Size

Figure 5-9: Ownership Status

Figure 5-10: Housing demand as per income category

Figure 6-1 Types of Materials

Figure 6-2: Vehicle Growth, 2011 to 2015

Figure 6-3: Vehicle classes

Figure 6-5: Present Level of Service of Different Roads

Figure 6-6: Mode of Transport Usage

Figure 7-1: Places of Tourist Attractions, Nadaun

Figure 7-2: Nadaun Fort

Figure 7-3: Nadaun Fort

Figure 7-4: Historical Gurudwara, Nadaun

Figure 7-5: Samadhi of Dhyanu Bhagat

Figure 7-6: Baoli at Gagaal

Figure 7-7: Pattan Bazaar di Periyan

Figure 7-8: Shiv Temple in Nadaun

Figure 7-9: Peer Saheb Grave

Figure 7-10: Atal Bihari Vajpayee Cricket Stadium

8367

jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939

Figure 7-11: Principles of Sustainable Tourism

Figure 8-1:Himachal Institute of Pharmaceutical Research Institute, Nadaun

Figure 8-2: Vijay Vallabh Pvt ITI, Nadaun

Figure 8-3: Sub-Divisional Veterinary Hospital

Figure 8-4: Community Hall

Figure 8-5:Existing Park in Nadaun Planning Area

Figure 8-6: Ramlila Maidan

Figure 8-7: Atal Bihari Vajpayee Stadium in Bela

Figure 9-1: Intensity-Duration Curve

Figure 10-2: Earthquake Hazard Map

Figure 10-3: Tehsil wise forest fire risk area of Hamirpur district

Figure 10-4: Probabilistic seismic hazard analysis

Figure 10-5: Location of Llineament and Landslide Prone Area in Nadaun Planning Area

Figure 13-1: Development Proposals

Figure 13-2: Proposed Transportation Facilities

Figure 14-1: Existing Land use Map of Nadaun Planning Area, 2016

Figure 14-2: Proposed Land Use Plan

List of Maps

E\01

Cadastral Map

E\02

Settlement Map

E\03

Road Network Map

E\04

Forest Map

E\05

Agricultural and Horticultural Map

E\06

Educational Facility Map

E\07

Health Facility Map

E\08

Heritage Structure Map

E\09

Existing Land Use Map

A\01

Slope Analysis Map

A\02

Catchment Analysis Map

A\03

Government Land Map

A\04

Non Developable Land Map

A\05

Developable Land Map

P\01

Proposed Land Use Map

List of Abbreviations

%

percent

AGiSAC

Aryabhatta Geo Informatics and Space Application Centre

BIS

Bureau of Indian Standard

BMO

Block Medical Office

BOD

Biochemical Oxygen Demand

CAGR

Compound Annual Growth Rate

CBSE

Central Board of Secondary Education

CD Block

Community Development Block

CFL

Compact Fluorescent Lamp

CPCB

Central Pollution Control Board

cumes

Cubic meter per second

DHE

Department of Higher Education

DO

Dissolved Oxygen

DPF

Demarcated Protected Forest

DSP

Deputy Superintendent of Police

DTCA

Department of Tourism and Civil Aviation

ft.

feet

GDDP

Gross District Domestic Product

GDP

Gross Domestic Product

GEC-97

Groundwater Resource Estimation Committee - 1997

GIS

Geographic Information System

8368

jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939

GoHP

Government of Himachal Pradesh

GoI

Government of India

GP

Gram Panchayat

GSDP

Gross State Domestic Product

ha

Hectare

HFL

High Flood Level

HFW

Health and Family Welfare Department

HGV

Heavy Goods Vehicles

HH

Household

HPIPH

Himachal Pradesh Irrigation and Public Health Department

HPSEB

Himachal Pradesh State Electricity Board

HPSPCB

Himachal Pradesh State Pollution Control Board

HPTCP Act

Himachal Pradesh Town and Country Planning Act

HRTC

Himachal Road Transport Corporation

I.C.A.R

Indian Council of Agricultural Research

IRC

Indian Road Congress

IPH Dept.

Irrigation and Public Health Department

ITI

Industrial Training Institute

km

kilometer

L.U.P.

Land Use Planning

LED

Light Emitting Diode

LMV

Light Motor Vehicle

LOS

Level of Service

lpcd

litres per capita per day

LWSS

Lift Water Supply Scheme

m

metres

MLD

Million Litres per Day

mm

millimeter

msl

mean sea level

MSME

Micro Small and Medium Enterprises

MDR

Major District Road

MoEF

Ministry of Environment and Forest

MoUD

Ministry of Urban Development

MoRTH

Ministry of Road Transport and Highways

MT

Metric Tonne

MW

Mega Watt

NAC

Notified Area Council

NDDP

Net District Domestic Product

NDP

Net Domestic Product

NH

National Highway

NHAI

National Highway Authority of India

NIDM

National Institute of Disaster Management

NP

Nagar Panchayat

NRSC

National Remote Sensing Centre

NSDP

Net State Domestic Product

O-D

Origin - Destination

ODR

Other District Road

PCI

Per Capita Income

PCU

Passenger Car Unit

PM

Particulate Matter

PMGSY

Pradhan Mantri Gram Sadak Yojana

pph

persons per hectare

PPP

Public Private Partnership

PPPP

People Public Private Partnership

ppm

parts per million

PRI

Panchayati Raj Institution

psi

pounds per square inch

PWD

Public Works Department

RFP

Request for Proposal

ROW

Right of Way

RSPM

Respirable Suspended Particulate Matter

SC

Scheduled Caste

8369

jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939

SDM

Sub-Divisional Magistrate

SHO

Station House Officer

SPM

Suspended Particulate Matters

sq.km.

square kilometer

ST

Scheduled Tribe

TCPD

Town and Country Planning Department

UGC

University Grant Commission

UGR

Under Ground Reservoir

UN

United Nations

UNESCO

United Nations Educational, Scientific and Cultural Organisation

URDPFI

Urban and Regional Development, Planning, Formulation and Implementation

USP

Unique Selling Proposition

UT

Union Territory

UFW

Unaccounted For Water

V/C

Volume/Capacity

WHO

World Health Organisation

WPR

Work Participation Rate

___________

EXECUTIVE SUMMARY

1.0

Project Context

Himachal Pradesh is one of the leading hill States in India with a population of 68,64,602 persons

as per 2011 Census. There are 54 Urban Local Bodies and 59 census towns in the State. Apart from

these, there are 34 Planning Areas and 35 Special Areas notified under the provisions of the

Himachal Pradesh Town and Country Planning Act, 1977.

In the wake of rapid urbanisation and economic growth, the Government of Himachal Pradesh

(GoHP) intends to regulate the development process in its urban settlements, to ensure that these

urban settlements continue to serve their purpose without causing inconveniences and difficulties to

the population, and the administration. To achieve the same, the Department of Town and Country

Planning has prepared this Development Plan.

2.0

Planning Area Profile

Nadaun is a historical trade town in Hamirpur district which is famous for its historical Nadaun

Fort and Dasvin Patshahi Gurudwara, National level Atal Bihari Vajpayee Cricket Stadium,

Laveneshwar Mahadev Temple and Peer Sai Fazal Shah Saheb Grave. Nadaun is situated between

Kangra and Hamirpur Towns. It is situated at the foothills of Shiwalik ranges at an elevation

ranging from 260 to 400 meters above mean sea level on the left bank of the Beas River. The town

is situated in sub-tropical monsoon climatic region with wet summer and cold-wet winter seasons.

The major soil type in the region is sandy loam which is good for both cultivation and forestry.

Nadaun Planning Area comprises of four revenue villages of Nadaun Nagar Panchayat and eleven

Revenue Villages in Gram Panchayats constituting 9,912 population and comprising 897.39 Ha of

area. The gross population density of Nadaun Planning Area stands at 11 pph. The gross population

density of Nadaun Nagar Panchayat is 19 pph in 2011 which has been in a constant since 2001

attributed due to low growth rate of population in urban area. However, Nadaun Planning Area has

a net density of 74 pph.

Nadaun Planning Area is located at cross-junction of two National Highways, NH-3 connecting

Nadaun with Atari and Manali via Amritsar-Jalandhar-Hoshiarpur-Hamirpur-Mandi-Kullu and NH-

303 connecting Nadaun with Nagrota via Ranital-Jwalamukhi. The nearest airport is located at

Gagaal at a distance of 59 km while the nearest railway station is Jwalaji Road (a narrow-gauge

8370

jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939

railway station) at about 33 km away from the planning area. The nearest broad-gauge railway

station is located at Amb at a distance of 38 km from the planning area.

2.01

Demographic Characteristics

Of the total population of Nadaun Planning Area (i.e., 9,912) 44.69% population (4,430) reside in

the Nagar Panchayat Area and 55.31% (5,482) in the rest of the planning areas. The Planning Area

has a decadal population growth of 12.68% in the last decade, a sex ratio of 996 females per 1000

males and literacy rate of 91% as per Census 2011. The Planning Area has about 16% population,

under category of Scheduled Caste and Scheduled Tribe.

2.02

Economy of the Planning Area

The Work Participation Rate of the planning area is 46% with most of the workers (56.64%)

engaged in tertiary sector, 41.64% engaged in primary sector and only 1.72% works engaged in

secondary or industrial sector. The workforce constitutes of 59% male and 41% female workers as

per Census 2011. The percentage of women participation has increased from 30% in 2001 to 41%

in 2011 with 72% women engaged in the primary sector. Maize and wheat are major food crop

cultivated during Kharif and Rabi season respectively. Nadaun falls in the vegetable producing belt

of the state. The main horticultural crops in the region include oranges, lemons, amla, mangoes and

galgal.

2.03

Transportation and Connectivity

Stretch of about 6.76 km of National Highway falls in the planning area. Out of which, 2.88 km act

as the urban road in Nadaun. The NHs are two lane undivided roads with 1.5m shoulders at both

ends in the planning area. Out of the total roads maintained by Nagar Panchayat, 90% are concrete

road, 7% are bitumen and 3% earthen. The other roads passing through the planning area viz.,

Major District Road (MDR) and Other District Roads (ODR) are maintained by PWD. Most of the

village roads are constructed under Pradhan Mantri Gram Sadak Yojana. Of the total roads under

PWD, 93% roads are metalled and rest non-metalled. There is no designated on-street or off-street

parking spaces and designated pathways in the planning area.

Walk trips constitute more than 65% of the total household trips. The modal split includes 65%

walk trips, 15% public transport (bus) trips, 13% two wheelers trips, 5% cars and 2% cycles/ NMT

trips.

As per the traffic survey, the Level of Service for the part of NH-3 connecting Jalari with Hamripur

is of Category A and the Level of service for the part of NH-3 connecting Nadaun with Amb and

Una is Category B while, the Level of Service for the part of NH-303 connecting Nadaun with

Kangra district is of Category C.

A by-pass has been proposed to divert the through traffic from Nadaun town. The by-pass is

proposed from the right bank of the River Beas. It enters the Planning Area near Nadaun Fort in

Bela village, passes through Tillu Khas and merge with the MDR 36 at Jalari.

2.04

Physical and Social Infrastructure Provision

Both surface water and groundwater are utilised to meet the water demand of the people of Nadaun

Planning Area. The estimated water demand for the planning area is 2.89 MLD and the sewage

generated is 2.50 MLD. Proper waste management for 16.66 T/day of the Planning Area would be

required.

8371

jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939

In terms of educational facilities, the area is self-sufficient with all the educational facilities and can

also cater to the future population. The level of medical facilities is inadequate in the planning area.

Also, there are no fire station and disaster management cell in the area. The planning area has good

coverage of telecommunications network, and is well connected with landline as well as mobile

telephonic connection. The villages have internet access facilities though the network connectivity

is poor. The villages are served by the sub-divisional head post office and sub-post offices. Every

village has postal facilities within 2km radius.

There are two main markets in Nadaun Nagar Panchayat area. The old market is located inside the

town and the new market is located near to bus stand. There are no recreational open green spaces

within the planning area, apart from a National level cricket stadium.

2.05

Forest and Environment

Nadaun Planning Area has a forest cover of 13.48% which includes 12.38% Demarcated Protected

Forest and 1.10% Forest under government land. The major species of tree found in the planning

area are Khair, Cheel, Shesam, Neem, Kikar, Sirish and Kasmal. The commonly found animals in

the district are namely leopard, hare, wild boar, jackal, kakar, monkey and sambhar.

As per the HPSPCB, the level of concentration of toxic substances such as SO2 and NO2 is within

the acceptable limits but the level of Suspended Particulate Matters (SPM) and Respirable

Suspended Particulate Matter (RSPM) present in the air is above the acceptable national standards.

2.06

Disaster Management

Nadaun Planning Area is highly prone to earthquake and related hazards. In terms of earthquake

hazard risk profiling, almost entire Hamirpur district (91%) falls in Zone V which is a very high

damage risk zone. Drought is another major problem of the region. The sources of drinking water

as well as nalah dry-up during the months of summer, due to depleted ground water level and

insufficient rainfall. In spite of being located in high vulnerability zone in terms disaster intensity,

no such preparedness mechanisms are observed at individual and community level.

2.07

Heritage and Tourism

In terms of cultural and historical importance, Nadaun Planning Area is endowed with a number of

heritage and architecturally magnificent structures of regional as well as religious importance. The

important places of interest in and around Nadaun Planning Area includes the Nadaun Fort, Peer

Saheb Grave, Patshahi Dasvin Gurudwara, Dhyanu Bhagat Samadhi, Pattan wali Paudiyan, Kaji

Pattan Paudiyan, Matta wali Paudiyan, 105 stepped Baoli and Beas River. Most of these heritage

structure are in a dilapidated conditions and no restoration processes have been undertaken by the

local or district level authorities.

There is a proposal by the State Government for river rafting from Nadaun to Dhera Bridge. It is

proposed that the base for the river rafting be developed on the north-western edge of the planning

area in Bela village in the vicinity of the Nadaun Fort. It is also proposed the camping sites be

developed on the river bed along the edge of Beas River. A Religious-cum-Heritage Tourist Circuit

is also proposed which includes Jwalaji-Pattan Bazaar-Shiv Temple-Samadhi of Dhyanu Bhagat-

Patshahi Gurudwara-Peer Saheb Grave-Lavneshwar Mahadev Temple-105 stepped Baoli-Nadaun

Fort.

The area has enough tourism potential which has not yet been explored.

2.08

Land Use

Out of the total land in Nadaun Planning Area (897.39 Ha) only 132.60 Ha i.e., 14.78% is

developed and remaining 764.79 i.e., 85.22% in under developed. Of the total developed land,

8372

jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939

about 64.32% is residential area while 5.18% of the land is under commercial use. Transportation

which includes road and other transportation facilities constitutes an area of 21.83 Ha i.e., about

16.47% of the total developed area. The public and semi-public area and open green area in Nadaun

Planning Area account for nearly 8.55% and 5.48% of total developed area of Nadaun Planning

Area. The total Nadaun Planning Area has about 57.51% land under agriculture, 15.89% land under

forest which includes about 12.38% land under Demarcated Protected Forest and 1.10% under

forest on government land. River Beas along with this bank cover about 11.76% of the total area

under Nadaun Planning Area.

3.0

Development Proposal

Based on the inherent potentials and prospects of the Planning Area. It is envisaged to develop

Nadaun as Tourism-cum-Trade Hub with encouragement given to agriculture while acting as a

Transit Town. All the supporting facilities and amenities will be developed so that it can cater

tourists as well as student population. Tourism, transit zone and mandi can emerge as an instrument

to drive economic growth and generate revenue, becomes sustainable for Nadaun.

3.01

Projections

Population of Nadaun Planning Area is anticipated to increase to 17501 by the year 2035. As 51

percent of the total population is anticipated to be workforce, there are likely to be 8926 workers,

accordingly provision of work areas has been made in the Development Plan.

4.0

Proposals and Recommendations

4.01

Housing

In order to cater for the requirements of housing for the anticipated population of 17501 persons in

the Planning Area by the year 2035, at the rate of 4.5 persons per family norm, nearly 3889 families

shall be residing in the planning area. Considering the present housing shortage of 311 dwelling

units, about 4200 dwelling units shall be required by the horizon period 2035. In view of present

trend of low residential density, at the rate of 75 persons per hectare, 104.83 hectares of additional

area is required to cater to the additional population of 7589. As 132.60 hectares area is existing,

therefore, the total developable area by 2035 would be 237.43 hectares including 2.37.hectares of

facilities and amenities.

In Nadaun Planning Area, as the residential development is envisaged to be primarily on the private

lands on one hand and acquisition being not preferred by the land owners, the onus of development

of residential areas vest with them. The land owners are to ensure either planned sub-divisions of

land or land pooling and reconstitution of the plots and accordingly development therein, ensuring

provision of convenient shopping, basic service infrastructure including water supply, sewerage

drainage, electric supply, road and other requisite facilities and services in view of creation of plots.

The owners may construct houses only for their own purpose without exhausting this process. The

housing areas are proposed to be developed by integrating future work areas and evolving

safeguards for forest areas. The proposed housing sectors/ clusters are proposed to be developed on

the neighbourhood principles of self-sufficiency by making provision of requisite infrastructure

therein. The concerned local body/Panchayat will be responsible for ensuring the implementation

of basic services and infrastructure at local level, by raising the resources through process of

undertaking remunerative schemes in the area on land to be got surrendered in its name during the

course of Land Pooling and Reconstitution mechanism. In case of bigger land parcels of vacant

land the same are to be developed by a development agency which has to play an effective role.

4.02

Trade and Commerce

The existing commercial area comprising of old bazaar (Pattan Bazaar) and the Main Bazaar and

will continue to function as such. Commercial activity in the developing new areas shall be allowed

8373

jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939

in a planned manner only. Following proposals are being made with regard to trade and

commerce:-

1. There is a need of wholesale and warehousing market (Mandi) for both Fruits and

Vegetable and Grains for the town. The same is being proposed over an area of 1.29

hectares at Jalari at the cross junction of NH-3 and MDR 36.

2. While the main bazaar shall continue to act as the Town Centre of Nadaun town. There

shall be sector-level or cluster level shopping in various sectors of the town. Such

shopping centres shall help ease off pressure on main bazaar. The following norms are

suggested for planning the above-mentioned shopping centres: —

a)

Sector-level shopping centre-45 to 50 shops for a population of 5000 persons.

b)

Convenient shopping centre-10 to 15 shops for a population of 1000 persons.

3. In order to cater to the envisaged tourist population visiting Nadaun hotel and related

activity is proposed along NH-3.

Nadaun is a traditionally a trade and historic town. In view of increase in trading activities and

boost of tourism in the region, it is proposed to develop a commercial hub at in Tillu Pratham

village along the NH-3 and about 10 hotels shall be required to cater to the tourist population by the

year 2035. The land required for plot @ 350-400 sq.m. area per hotel which includes parking and

circulation area works out to 1.67 hectares. Beside this, an area of 1.84 hectares is required for

Retail Shopping Centre at Jalari, Kuthar and Tillu Khas villages. Thus, total requirement works out

to 8.70 hectares. As existing area under commercial use is 6.88 hectares, therefore, total additional

requirement works out to 1.82 hectares.

4.03

Mixed Use

Mixed land use zone has been proposed at strategic location along the NH-3 and NH-303. It

accounts of an area of 2.41 hectares within the planning area.

4.04

Industry

There are no industrial unit operating in the town presently. In order to cater for the requirements of

anticipated secondary work force of 893 workers, @ 115 sq.m. area per worker, an area of 10.27

hectares is required for Industry by the year 2035.

It is proposed to develop an industrial estate in Tillu Khas village along the proposed 24m wide by-

pass on about 10.27 Ha of available government land. Non-polluting and non-hazardous small-

scale or cottage industrial units are proposed in the industrial area viz., Handicraft industries, and

agro processing industries.

4.05

Transportation

An area of 21.83 hectares is under the existing transportation network. Town level, inter-sectoral,

sectoral and cluster roads are required to be developed in the Planning Area.

With increase in traffic it is envisaged that present NH-3 and NH-303 will not be able to

accommodate traffic hence, it is proposed to increase the width of the present NH-3 and NH-303

from present 10 m ROW to 15 m ROW.

As most of the traffic entering Nadaun is E to E i.e., External to External, two by-passes have been

proposed one parallel to NH-3 and NH-303 traversing from the right bank of Beas river and

entering Bela near Nadaun Fort and then entering Tillu Khas village before meeting NH-3 at Jalari

and the other connecting old NH-70 (new NH-3) and old NH-88 (new NH-3) via Bharmoti Kalan at

8374

jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939

Jalari. The NH-303 and NH-3 by-passes have been proposed with an ROW of 24 m and the other

by-pass of 15 m ROW.

Three junction improvements have been suggested one at present junction of NH-3 and NH-303

near the Bus stand, another at the junction of NH-3 and proposed By-pass in Bharmoti Kalan and at

the junction of NH-3 with the two proposed by-passes at Jalari.

A truck terminal is proposed at the cross junction of the proposed by-pass and MDR-36in Jalari

Saunkhlan. The truck terminal proposed on Government land measuring an area of about 0.62

hectares. The truck terminal has been strategically located in close vicinity of the proposed

Wholesale and Warehousing Centre (Mandi) located on the other side of the NH-3 in Jalari village

as the two activities are correlated and dependent on each other.

The present bus terminal is in the heart of the town in the main market. As per the traffic

projections it is envisaged that the present bus terminal will not be able to accommodate the future

traffic volume of vehicles/people. Hence, a new bus terminal is proposed along NH-3 in an area of

about 0.56 hectares in Nagarada village.

A part from these, new roads of 6m and 9m and widening of important roads have also been

proposed in the planning area

To cater to the town level parking requirement, parking lots and taxi stand have been proposed at

various locations amounting to an area of 1.0 ha. Local level parking requirements of each land use

zone have to be met locally.

4.06

Tourism

The development of tourism in and around Nadaun call for systematic and planned development,

check on encroachments, cleanliness of town, integration and systematic and planned marketing of

tourist destinations in surrounding areas, like Nadaun Fort and other heritage sites within the

planning area and provision of basic amenities at genuine rate.

In order to boost the tourism activity in the Planning Area it is proposed to repair and restore the

Nadaun fort, develop the adjoining area in to a tourist spot with landscaped gardens, pathways and

sitting arrangements. It is further proposed to conduct light and sound show to present the rich

history of the Nadaun Fort. It is also proposed to develop other heritage sites within the planning

area as tourist sites.

4.07

Public and Semi Public

An area of 11.33 hectares is existing under utilities, facilities and services. It is anticipated that an

area of 2.35 hectares will be required more for providing various facilities at Regional to Cluster

level in the Planning Area by the year 2035 as per the requirements.

4.08

Parks and Open Spaces Use

The town lacks in organised parks and open spaces. Local Parks are therefore, required to be

developed at cluster/sector level. At the rate of standard of 1.00 hectares per 1000 population, 17.50

hectares land is required to cater for population of the Planning Area by the year 2035. As 7.27

hectares area is existing, therefore, 18.92 hectares area is required more. It is proposed to develop

the old Nadaun Fort area into a tourist spot-cum-recreational area with landscaped gardens with

fountains, and conducting light and sound show within it. About10 hectare land has also been

earmarked for proposed Botanical and Zoological Park in Tillu Khas village.

8375

jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939

4.09

Forest Areas

Nearly about 111.06 hectares of land falls under Demarcated Protected Forest use in Nadaun

Planning Area. This has been indicated in the existing land-use map as well as the proposed land-

use map. It is proposed to maintain and preserve all these forest areas. However, due to widening of

Tillu Khas road, the area under DPF has reduced to 109.38 hectares.

4.10

Water Bodies Use

The land under Water Bodies i.e. 105.51 hectares shall remain without change in land use.

1

The Context

1.1

Background

Himachal Pradesh is one of the highly developed States of India with a population of 68,64,602

persons as per 2011 Census. There are 541 Urban Local Bodies and 56 census towns2 in the State.

Also, there are 34 Planning Areas and 35 Special Areas3 notified under the provisions of the

Himachal Pradesh Town and Country Planning Act, 1977.

In the wake of rapid urbanization and economic growth, the Government of Himachal Pradesh

intends to regulate the development process in its urban settlements, to ensure that these urban

settlements continue to serve their purpose without causing inconveniences and difficulties to the

population, and the administration. To achieve the same, the Town and Country Planning

Department, Himachal Pradesh, has prepared this Development Plan for the horizon year 2035.

1.2

The Context

Nadaun is a geographically as well as administratively an important town in Hamirpur District. It is

the headquarters of Nadaun Sub-Division, Nadaun Tehsil and Nadaun Block. Besides this, Nadaun

has become an important regional trade and educational centre, increasing trade and commercial

activities with potential for allied agro/forest based industries in the vicinity have strong bearing on

its future growth. On opening of Atal Bihari Vajpayee Cricket Stadium, a national level cricket

stadium, growth potentials of town have further enhanced.

In order to ensure planned and regulated physical development of such a strategically important

town, the Himachal Pradesh Town and Country Planning Act, 1977 was extended to Nadaun

Planning Area in the year 2014 vide Gazette notification no. F (5)-7/2013 dated 15-1-2014,

covering an area of 1269.59 hectares spreading over 25 revenue villages. Later the planning area

was reduced and 10 complete revenue villages and one partly was excluded from the planning area

vid Gazette Notification No. F (5)-7/2013 dated 14-5-2015. The revised planning area includes the

Nagar Panchayat Area and 10 complete surrounding revenue villages and one partly.

For a planned and regulated development of the Nadaun Planning Area, a comprehensive

Development Plan was inevitable. Thus, this Development Plan has been prepared after making

exhaustive exercises like collection of primary and secondary data, field surveys, household, land

use and traffic survey and after examining the quantitative and qualitative aspects of various land

uses, development activities, problems and prospects of Nadaun Planning Area. The Development

Plan also includes existing situation analysis, demand-gap assessment, projection and forecasting,

future demand estimation, proposals and recommendations, policy framework and implementation

strategy.

1 Source: Urban Development Department - Himachal Pradesh, http://ud-hp.in/ulblist.html

2 Source: Census of India – 2011, http://censusindia.gov.in/towns/HP_towns.pdf

3 Source: Department of Town and Country Planning, Himachal Pradesh

8376

jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939

In order to prepare a technically viable document, acceptable to the masses, stakeholders meeting

along with face to face interactions with various government and semi-government officials,

members of Nagar Panchayat committee, public representatives Non-Govt. Organizations (NGO's)

and general public have been organized.

The Development Plan of Nadaun Planning Area contemplates increase of population from 9,912

in 2011 to 17,642 by the year 2035.

1.3

Objective

The foremost objective of the Development Plan for Nadaun is to guide the present and future

growth towards a planned and sustainable development.

The four key goals of the Development Plan are:

i.

Achieve economic growth.

ii.

Provide safe liveable neighbourhoods.

iii.

Provide efficient and sustainable physical and social infrastructure system.

iv.

Conserve the environment both natural and manmade.

____________

Planning Area Profile

2.1

Introduction

Nadaun is a small town in Himachal Pradesh located on north-west corner of Hamirpur District. It

is the Headquarters for both Nadaun Tehsil as well as Nadaun Sub-Division. Geographically,

Nadaun is situated on the foothills of the Shiwalik range on the left bank of River Beas (Refer

Figure 0-1). Besides its beautiful setting, the town has fascinating and variable scenery throughout

the year.

2.1

Location

Nadaun is located at 31.78°N 76.35°E. It has an average elevation of 508 metres (1666 feet) from

Mean Sea Level. It is situated at a distance of 28 km from Hamirpur and 12 km from Jwalamukhi

on the cross-junction of NH-3 connecting Nadaun with Atari and Manali via Amritsar-Jalandhar-

Hoshiarpur-Hamirpur-Mandi-Kullu and NH-303 connecting Nadaun with Nagrota via Ranital-

Jwalamukhi.

The town is spread over an area of 2.31 sq.km having a population of 4,430 as per Census of India,

2011 and the Planning Area covers 8.97 sq. km. having a population of 9,912 as per Gazette

Notification No. TCP-F (5)-7/2015 dated 14.05.2015.

It is well connected by roads with the major towns of the District and the State as well as the

neighbouring States. The closest airport is Gagaal Airport situated at 59 km distance from the town

center and the nearest rail head is at Jwalamukhi Road at 33 km.

2.2

Planning Area

Nadaun Planning Area was first notified vide Gazette Notification No. TCP-F (5)-7/2013 dated

15.01.2104 wherein 25 revenue villages (mohals) including Nadaun Nagar Panchayat area was

notified. Later, ten revenue villages (mohals) were completely excluded from the Planning Area

8377

jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939

and one partly as these mohals were situated outside the influence zone of Nadaun Town. The

Planning Area was re-notified vide Gazette Notification No. TCP-F (5)-7/2015 dated 14.05.2015.

Nadaun Planning Area comprises a total of 15 mohals of which four mohals lie within the Nadaun

Nagar Panchayat Area and remaining eleven mohals within the Gram Panchayat Area. The Nagar

Panchayat Area constitutes four mohals viz., Kot, Seri, Dolee Gharan and Nagarada. (Refer Figure

0-2).

The Planning Area has an area of about 897.39 Ha or 8.97 sq.km with a population of 9,912.

2.3

Extent of Planning

The planning area is bound by River Beas on the northern and north-eastern side and by Man Khad

on the western side. Nadaun town is located at the tri-junction of two of NH i.e., NH-3 (Atari-

Manali) and NH-303 (Nadaun- Nagrota).

North: Starting from the confluence point of Beas River and Man Khad along upstream of River

Beas following the northern boundary of Mohal Kot, Seri and Bela, up to the northern-eastern

boundary meeting point of Bela.

East: Starting from the meeting point of northern-eastern boundary of Mohal Bela towards

southern side following the eastern boundary of Mohal Bela, Tillu Khas, DPF Tillu, Jalari

Saunkhlan, up to the meeting point of eastern-southern boundary of Mohal Jalari Saunkhlan.

Figure 0-1: Location of the Planning Area

Source: Composed based on TCPD Gazette Notification TCP-F (5)-7/2015 dated 14.05.17

N

N

H

-

N

H

-

9,9

8378

jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939

South: Starting from the meeting point of eastern-southern boundary of Mohal Jalari Saunkhlan

towards western side following the southern boundary of Mohal Jalari Saunkhlan, up to NH-3

(Atari-Manali) then following the Nallah boundary downstream passing between Mohal Harmandir

Rukwalan, then following the southern boundary of Mohal Harmandir Mandiala, Mohal Bharmoti

Kalan, up to the meeting point of southern-western boundary of Mohal Bharmoti Kalan.

West: Starting from the meeting point of south western boundary of Mohal Bharmoti Kalan

towards northern side following the western boundary of Mohal Bharmoti Kalan, Nagarada and

Kot, up to the confluence point of Man Khad and Beas River.

The composition of Nadaun Planning Area is presented in Table 0-1.

Table 0-1: Notified Planning Area of Nadaun

Sl. No.

Name of Revenue Village

Area

(in Ha.)

Population

1

Seri

Naga

r

Panc

haya

t

61.48

4430

2

Kot

74.00

3

Nagarada

72.84

Figure 0-2: Nadaun Planning Area, Hamirpur

Source: Composed based on TCPD Gazette Notification TCP-F (5)-7/2015 dated

14.05.2015

NH-

303

NH-3

NH-

3

8379

jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939

4

Dolee Gharan

23.15

5

Tillu Pratham

13.32

335

6

Bela

193.94

2347

7

DPF Tillu

87.10

46

8

Gagaal

31.92

251

9

Kuthar

45.83

356

10

DPF Kuthar

31.14

-

11

Bharmoti Kalan

98.65

526

12

Tillu Khas

72.96

649

13

Harmandir Mandiala

57.60

458

14

Harmandir Rukwalan (Partly)

5.06

20

15

Jalari Saunkhlan

28.40

494

Total

897.39

9912

Source: TCDP Gazette Notification TCP-F (5)-7/2015 dated 14.05.2015

2.4

Administrative Set-up

Nadaun is the Tehsil as well as Block Headquarters of Nadaun Tehsil and Nadaun Block of

Hamirpur District respectively. It is also the sub-divisional head quarter of Hamirpur District.

Nadaun Planning Area consists of both the urban and rural areas. The urban area i.e., Nadaun town

is under the jurisdiction of the Nagar Panchayat and the rural areas i.e., the villages are under the

Gram Panchayats.

With rapid urbanization, the settlement of Nadaun grew into a town. Notified Area Committee or

Nagar Panchayat has been constituted which is managing the civic functions of town. The Nagar

Panchayat was constituted on 1st August, 1974. The Nagar Panchayat area is divided into 7 wards,

represented by 7 elected councillors. The institutional, residential and commercial areas have

however been developed outside the Nagar Panchayat area in the Gram Panchayats.

Nagar Panchayat of Nadaun presently, performs only four functions out of eighteen functions listed

in Twelfth Schedule of the 74th Constitutional amendment. Refer Annexure 1 for the Twelfth

Schedule of the 74th Constitutional amendment.

The functions performed by Nadaun Nagar Panchayat are revenue generation though collection of

property tax, shop rents, planning and construction and maintenance of metalled roads, street lights,

drainage system, parks and recreational centres and regulating and monitoring on construction of

building activities in Nagar Panchayat boundary.

There are three Gram Panchayats in Nadaun Planning area viz., Bela, Jalari and Bharmoti Gram

Panchayat.

Figure 0-3: Administrative set up in Planning Area

Source: Block Development Office, Nadaun

Under Secretary,

Nagar Panchayat

8380

jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939

2.5

Regional Setting and Linkages

The planning area is well connected by air, rail and roadways with all the major towns and cities of

Himachal Pradesh and India. The district head-quarter Hamirpur is just 28km away from Nadaun.

Shimla, the state capital is located at a distance of 170km from Nadaun Planning area. The two

important cities of regional importance and opportunities namely, Chandigarh and Delhi are located

at distances of 177 km and 406 km respectively.

Considering the strategic location of Nadaun town, it has the potential to be developed as a Transit

node in between Kangra and Hamirpur on one side and Kangra and Una on the other side.

2.5.1 By Air

Gaggal Airport in Kangra District is the nearest airport to Nadaun. It is located 59 km north of

Nadaun. Daily three flights ply between Delhi and Gaggal.

2.5.2 By Rail

The nearest railhead of Nadaun town is Jwalamukhi Road which is located 33 km north of the

town. It is a Narrow-Gauge Railway line which connects Pathankot with Kangra and

Jogindernagar. There is another Broad-Gauge railhead located at Amb, at a distance of 38 km south

west of Nadaun town. It is directly connected with Chandigarh and Delhi via Una.

Figure 4-4: Regional Connectivity of Nadaun

Source: Google Maps

8381

jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939

2.5.3 By Road

Nadaun is located along the NH-3 and NH-303. The town is accessible from Hamirpur (28 km

south east of the town) and Una (72 km south west of the town) by NH-3 which connects Atari-

Amritsar-Jalandhar-Hoshiarpur-Nadaun-Hamirpur-Toni Devi-Awa Devi-Mandi- Kullu- Manali4.

Sujanpur is accessible via MDR 36. The Hamirpur road (NH-3) connects Nadaun with Shimla (the

state capital) and Amb road (NH-3) connects Nadaun town Chandigarh and Delhi (National

Capital).

2.6

Historical Setting

2.6.1 Pre-Independence

During the Medieval times, Nadaun was a part of the Princely State of Kangra. It was the

headquarters of the Nadaun Jagir in the Princely State of Kangra. Maharaja Sansar Chand II5 of

Kangra held his court during summer for a number of year during his reign6.

Raja Jodhbir Chand, son of Raja Sansar Chand II, was the first king of Nadaun. He was granted the

jagir of Nadaun in 1823.7 Nadaun soon emerged as a centre of arts and commerce.

Nadaun was a cheerful place, during the reign of Sansar Chand II. There was a saying in Kangra

hill that "Aaye Nadaun Jaaye Kaun" (who comes to Nadaun would never want to go back).8 Bulleh

Shah, a famous sufi poet, in his famous poem "Bulla Ki Janna mein Kaun", also mentions Nadaun

as "Na mein rehnda vich Nadaun" (nor do I live in Nadaun).4 Ghulam Mohiuddin also, writes in

Tarikh-i-Punjab that it is peaceful town with a good Rest House, an Old Palace and Shiva temple.5

However, the history of Nadaun dates back to the seventeen century, when the famous Battle of

Nadaun was fought. The Battle of Nadaun was fought on the banks of Beas River, between Raja

Bhim Chand of Kahlur (Bilaspur) and the Mughals under Alif Khan in the year 1691. The Mughal

emperor, Aurangzeb's expeditions in Deccan in the 1690s, had put considerable strain on the

Mughal exchequer. As a result, Aurangzeb issued orders to the Governor of Punjab, Azim Khan, to

recover annual tributes from the rulers of hill states, who had been defaulting on the payment for

three consecutive years.

Azim Khan assigned the duty of collecting tributes to Mian Khan, the viceroy of Jammu. The duty

of collecting tributes from Kangra and adjoining principalities was assigned to Alif Khan.9 The

Raja of Kangra and Raja Dayal of Bijarwal agreed to the demands of Alif Khan. However, Raja

Bhim Chand of Kahlur (Bilaspur) refused to oblige and formed an alliance with other chieftains

opposed to the Mughals.

As per the tenth Granth of Guru Granth Sahib (holy book of Sikhs), Guru Gobind Singh (the tenth

Sikh Guru) fought his second battle in Nadaun on 4th April 1691 and is described as ‘Nadaun

Jang’. The first battle was fought between Guru Gobind Singh and King of Bilaspur near Bhagani

Paonta Saheb. The second battle was fought by Guru Gobind Singh with Mughals on the invitation

of Raja Bhim Chand of Kahlur (Bilaspur). Guru Gobind Singh came to fight the battle along with a

group of 500 Sikhs with Mughals lead by Alif Khan.10

4Source: MoRTH Gazette Notification S.O. 689(E) dated 04.04.2011

5 http://www.royalfamilyofindia.com/kangra/

6 History of the Punjab Hill States, J. Hutchinson and J. Ph. Vogel, 1933

7 http://www.indianrajputs.com/view/nadaun

8 http://himachal.gov.in/index1.php?lang=1&dpt_id= 201&level=1&lid=8904&sublinkid=8607

9 History of the Punjab Hill States, J. Hutchinson and J. Ph. Vogel, 1933

10 http://himachal.gov.in

8382

jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939

Mughals and his aides were defeated at a battle in Nadaun. After the battle ended, Guru Gobind

Singh stayed in Nadaun for eight days, before returning to Anandpur. Later, Maharaja Ranjit Singh

built a Gurudwara on the spot where the Guru had pitched his tent.7 The Gurudwara was built to

commemorate Guru Gobind Singh's victory in the Battle of Nadaun. The Gurudwara known as

Gurudwara Dasvin Patshahi or Gurudwara Nadaun Sahib,11 is a prominent place of worship.

2.6.2 Post-Independence

Post-Independence, Nadaun was a part of Kangra District. As a result of trifurcation of Kangra

District as Kangra, Hamirpur and Una on September 1, 1972, Nadaun became a part of Hamirpur

District of the new State of Himachal Pradesh.

2.7

Evolution of Town

Nadaun town started to evolve in the vicinity of the Patshahi Gurudwara on the North West. When

Nadaun came under the jagir of Raja Jodhbir Chand, his palace was built on the north east near the

bank of the River Beas. A small settlement in Amtar began to evolve in close vicinity of the king’s

palace. However, the main city continued to grow on the north-western side primarily due to its

nearness with Kangra, the then State Capital and its location on the trade route.

Over the years, the Nadaun town is divided into the Old Town and the New Market Area. The Old

Town comprises of Old-Market Area (also called Pattan Bazaar) and Old-Bus Stand Area (also

called Jesri). The New Market Area comprises the New Bus-Stand and the Main-Market Area.

The old-market area used to be main center of shopping when the market shifted to what is

currently the main-market area. The main-market area is further divided into two parts- the upper

bazaar which is close to the Bus-stand and the main-bazaar. Main-Bazaar is in the heart of Nadaun

town and is the center of business in Nadaun. Pattan area has got a big play-ground which hosts

various cultural events like Ramlila and sometimes used for political and election rallies.

Nadaun is known for Lavneshwar Mahadev temple which is said to be have been founded by the

Pandavas. It is the birth place of famous freedom fighter Inderpal. A statue of the famous freedom

fighter has also been erected at the junction of the New Bus Stand and the junction is named after

him. The Patshahi Gurudwara was affiliated to Shiromani Gurudwara Prabandhak Committee in

1935.

The town is also famous for the Atal Bihari Vajpayee Cricket Stadium where National level cricket

matches are organised. It is located at the North-eastern edge of Nadaun Planning Area in Bela

Gram Panchayat.

2.8

Geographical Setting

2.8.1 Physiography

Even though Nadaun is located in the foot hills i.e., Shiwalik Range of Himalayas, it is mostly plain

and has a flat terrain. The planning area has two protected forest located on the two ridges in the

centre of the planning area on either side of the NH-3. Beas River flows towards the north side of

the planning area and Man Khad flows on the western side of the planning area. The natural

drainage consists of inlets and rivulets which has not been developed inside the planning area.12

11 Sikhwiki.com and Documents from Gurudwara

12 Ground Water Information Booklet, Hamirpur District, Himachal Pradesh, District Disaster Management Report, Hamirpur

8383

jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939

2.8.1.1 Elevation

The surface elevation of Nadaun Planning Area ranges from 260 m along the Beas river valley and

Man Khad to 400 m at the peak of DPF Tillu. The elevation of the planning area rises from the

Man Khad on the western side to the hill top on the south-eastern edge of the planning area. Refer

Figure 0-6.

The terrain of the Planning area is mostly plain (57%), rolling or undulating (29%) and hilly (14%).

Table 0-2: Terrain Analysis

Type of Terrain

Area

(in Ha)

Percentage

Plain°

515.70

57.47

Rolling or Undulating°

260.57

29.04

Hilly

121.12

33.57

TOTAL

897.39

100.00

Source: Estimation from the base map

2.8.1.2 Slope

The slope of the Planning Area is from south eastern side to north western, western and southern

side. As per the slope analysis, almost 87% of the total area in the Planning Area has a gentle slope

i.e. <15°. It is suitable for any development works. Almost 11% area falls under semi-steep slope

category that ranges from 15° to 30°. Approx. 2% area falls under steep slope category that ranges

from 30°-45°. A very small area of 2.26 Ha (0.25%) fall under highly steep slope i.e. >45° where

development of any sort is not possible.13 Refer Figure 0-7 and Table 0-3.

13 URDPFI Guidelines and http://www.sappi.com/regions /sa/SappiSouthernAfrica/Sappi%20Forests/ Tree%20Faming%20

Guidelines/Part%203_Forest%20Engineering_Chapter%207_Terrain%20Classification.pdf

Figure 0-5: Historical Evolution of Nadaun Town

Source: Analysis based on History of the Punjab Hill States, J. Hutchinson and J. Ph.

Vogel, 1933 and Field investigation

NH-3

NH-

3

NH

-

303

8384

jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939

Areas with more than 15° slope are covered with the forest. These areas are mainly eco-sensitive

zones which should be demarcated as the protected or no-development zone. Refer Annexure 2 for

Khasra falling in Steep Slopes.

Table 0-3: Slope Analysis

Range of Slope

Area (in Ha)

Percentage

Less than 15°

784.06

87.37

15° - 30°

93.87

10.46

30° - 45°

17.20

1.92

Above 45°

2.26

0.25

TOTAL

897.39

100.00

Source: Analysis based on Base Map prepared by AGiSAC

2.9

Climate

The planning area falls in the humid sub-tropical zone and experiences four broad seasons. The

winter season from December to February, summers from March to June, hot and rainy season

from July to September and autumn season in the months of October and November. The region

receives the 1340.72 mm of rains during the monsoon period. The maximum rainfall i.e. almost

82% occurs during July to August and minimum in the months of April and October. In all, there

are 124 rainy days in a year in Nadaun. The hottest month is May and coldest month is January.

Maximum and minimum temperatures recorded in the area ranges from 2˚ to 40 ˚C.

2.10

Flora and Fauna

The main species of trees available in the area are Khair, Cheel, Sheesam, Neem, Kikar, Sirish

Kasmal, Kachnar, Amaltash, Bhera, Kango, Aakhe, Anjeer, Ber, Mango, Jamun, Amla etc.

The species of animals commonly found in the district are namely leopard, hare, wild boar, jackal,

kakar, monkey and sambhar. Among the birds commonly found are namely chkor, crow, jungle

murga, kala titar, safed titar and woodpecker etc.14

Figure 0-6: Elevation Analysis - Nadaun Planning Area

Source: Analysis based on Base Map prepared by AGiSAC

14 Forest Range Office, Nadaun and District Disaster Management Report, Hamirpur

NH - 3

N

H -

30

3

8385

jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939

2.11

Geology and Soil Character

Nadaun belongs to the Middle Shiwalik Sub group. The Middle Shiwalik Sub-group comprises of

large thickness of coarse micaceous sandstone along with some interbeds of early clay. It normally

succeeds the Lower Siwalik along a gradational contact. The sandstone is less sorted than those in

Lower Siwalik. Clay bands are dull coloured and silty. The general thickness is 1400 to 2000

metres.

In the low-lying areas, along river beds newer alluvium of recent again is seen. The new alluvium

deposit comprises alluvium fans and terraces of unsorted sand, silt and clay and rock fragment and

boulder beds.15

The soil in general is brown and varies in texture from loamy sand to clay loam. This type of sandy

loam soil with coarse texture which enhances the nutrients and fluid movements that is very good

for plant growth and agriculture.16

At present, few items viz. building stone, sand, stone grit, etc. are being mined in the name of

mineral resources. In addition to it glass and silica sand pebbles are also found in the area of

Kunah, and Man khads but as yet no commercial exploitation of these minerals have been made.17

Figure 0-7: Slope in the Planning Area

Source: Analysis based on Base Map prepared by AGiSAC

15 Study on the Drainage System, mineral potential and feasibility of mining in river/ stream beds of District Hamirpur, Mining

Dept., Geological Wing, Hamirpur

16 District Disaster Management Report, Hamirpur

17 Source: Geological Study Report, Hamirpur District

NH - 3

N

H -

3

NH

-

303

8386

jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939

3

Demography

3.1

Introduction

There are four urban settlements in Hamirpur district viz., Hamirpur (MC), Sujanpur (MC), Nadaun

(NP) and Bhota (NP). As per Census 2011, Nadaun (NP) is a Class V town.

Table 0-1: Urban settlement pattern in Hamirpur District

Census Classification

Population Range

Name of Urban Settlement

Class I

100,000+

-

Class II

50000 - 99000

-

Class III

20000 - 49000

-

Class IV

10000 - 19999

Hamirpur (MC)

Class V

5000 – 9999

Nadaun (NP), Sujanpur (MC)

Class VI

Below 5000

Bhota (NP)

Source: Census of India, 2011

3.2

Population

Nadaun is a sparely populated town with a population of 4430 people in 2011 and 9,912 in the

notified Planning Area.

The planning area accounts for about 2.20% of the total population of Hamirpur district. The

population distribution of Nadaun Planning area is as follows:

Table 0-2: Population Distribution of Nadaun Planning Area

Area

Population

1991

2001

2011

Hamirpur District

3,69,128

4,12,700

4,54,768

Nadaun Planning Area

7,075

8,885

9,912

Nadaun Town

3,379

4,405

4,430

Rest of Planning Area

3,696

4480

5482

Source: Census of India, 1991, 2001 and 2011

According to the Census of India, 2011, Nadaun Planning Area comprises 44.69% population

(4430 people) residing in Nadaun town and 55.31% population (5482 people) reside in rest of the

planning area.

There are 9,912 people residing in Nadaun Planning Area out of which 4970 are male (50.14%) and

4942 are female (49.86%).

3.2.2 Population Growth

Nadaun Planning Area has a decadal growth rate of 12.68% which is more than the district average

of 10.20% from 2001 to 2011. The growth rate of Nadaun Planning Area is more than the district

averages of both the decades (1991-01 and 2001-11). The growth rate has drastically come down

from 25.58 in 1991-2001 to 12.68 in 2001-2011. This is the exclusive effect of natural population

growth in the planning area.

Figure 0-1: Growth Rate of Nadaun Planning Area

Source: Census of India, 1991, 2001 and 2011

8387

jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939

3.2.2 Population Distribution

Apart from Nadaun town, the Planning Area comprises of 11 surrounding revenue villages. Out of

these 11 villages, 7 villages have population less than 500 and one village Demarcated Protected

Forest (DPF) Kuthar with no population. Two villages viz., Bharmoti Kalan and Tillu Khas have

population between 500 and 1000 Out of the rural settlement Bela has the highest population of

2347 because of its close proximity to the Nadaun town. Refer Table 0-3.

Out of the eleven mohals outside Nagar Panchayat Area, Bela has the highest population of 2347

followed by Tillu Khas (649) and Bharmoti Kalan (526). The least populated villages are

Harmandir Rukwalan (population 100), Gagaal (population 251) and Tillu Pratham (population

335). Refer Table 0-4 for village wise population distribution in the planning area.

Table 0-3: Distribution of Settlements by Population Size, 2011

Population Range No. of Villages

Name of Village or Town

<100

3

DPF Kuthar, DPF Tillu,

Harmandir Rukwalan (partly)

100-500

5

Gagaal, Tillu Pratham, Kuthar,

Jalari Saunkhlan

500-1000

2

Bharmoti Kalan, Tillu Khas

1000-2000

0

-

2000-4000

1

Bela

>4000

1

Nadaun NP

Total

12

Source: Census of India, 2011

Table 0-4: Population Distribution in Nadaun Planning Area

Nagar Panchayat/ Village Name

Population

CAGR

(01-11)

1991

2001

2011

Nadaun NP

3379

4405

4430

0.06

Bela

1481

1856

2347

2.37

Kuthar

243

289

356

2.11

Harmandir Mandiala

322

385

458

1.75

Tillu Khas

481

461

649

3.48

Tillu Pratham

-

159

335

7.74

D.P.F. Tillu

-

4

46

27.66

D.P.F. Kuthar

-

-

-

-

Bharmoti Kalan

403

470

526

1.13

Jalari Saunkhlan

421

486

494

0.16

Harmandir Rukwalan (part)

129

141

20

-3.38

Gagaal

216

229

251

0.92

Total

7075

8885

9912

1.74

Source: Census of India, 1991, 2011 and 2011

3.2.3 Sex Ratio

As per the Census of India 2011, there are 996 females per 1000 males in Nadaun Planning Area

which is lesser than the district average i.e. 1095 females per 1000 males but more than the state

average i.e. 972 in 2011. The sex ratio of the planning area has also decreased from 1018 in 2001 to

996 in 2011 in planning area.

8388

jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939

3.2.4 Age-Sex Composition

A study of the Age Sex Composition of Nadaun Town reveals that the age group 05-25 i.e., the

Younger age group is highest in the town. The age-sex pyramid of Nadaun Town shows that

Nadaun is a developing town with broader base (more youth population) and tapping pinnacle (less

elderly population).

Figure 0-2: Age-Sex Composition

Source: Census of India

3.2.5 Scheduled Caste and Scheduled Tribe Population

Out of the total population of Nadaun Planning Area, 15% of the people fall in Scheduled Caste

(SC) category which is less than the district average i.e. 24% as per Census 2011. There has been a

very minimal decrease of Scheduled Caste population from 16% in 2001 to 15% in 2011, in a span

of ten years.

Out of the total SC population in the planning area, more than 1/3rd proportion i.e. 34% reside in

the Nadaun town whereas rest 66% is distributed in the remaining areas of the Planning area.

In case of Scheduled Tribe (ST) population, there are only 59 people are from ST category which

accounts to 0.59% of the total population of Planning Area as per Census 2011. Out of total 59 ST

people, 54 reside in the Nadaun town and rest 5 reside in Tillu Pratham.

Figure 0-3: SC distribution in Planning Area

Source: Census of India, 2011

8389

jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939

3.2.6 Literacy Rate

The overall literacy rate of the Planning Area is 91% which is higher than the district average i.e.

88% in 2011. There is a sharp increase in literacy rate in planning area from 87% in 2001 to 91% in

2011.

Figure 0-4: Literacy rate in Nadaun Planning Area

Source: Census of India, 2001 and 2011

3.2.7 Population Density

Nadaun Nagar Panchayat Area has a population density of 19 persons per hectare which is more

than the district urban average i.e. 10 persons per hectare in 2011. The population density is

stagnant since the last decade from 18.8 pph in 2001 to 19 pph in 2011.

The population density of the Planning Area is 11 pph in 2011 which is more than the district

average i.e. 4 pph. The population density has marginally increased from 10 pph in 2001 to 11 pph

in 2011. According to the URDPFI Guidelines, the planning area falls under very low-density area.

3.3 Population Forecast

The population of Nadaun Planning Area is expected to be in the range of 13,000 to 18,000 by the

year 2035.

3.3.1 Population Projection

Five population projection methods have been employed to forecast the probable increase of

population in the Nadaun Planning Area for the next twenty years i.e. up to 2035. The five

projection methods are as follows: -

Arithmetic Increase

Incremental Increase

Compound Annual Growth Rate

Geometric Increase

Exponential Increase

The forecasted population from the five methods lies is shown in the Table 0-5 below.

8390

jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939

As the population projected by the arithmetic increase and incremental increase are very low and

that by geometric and exponential growth method are moderate. The projected population by

CAGR method being more appropriate to be adopted.

Hence, the projected population for Nadaun Planning Area for the year of 2035 is estimated to be

17,501 approximately at a growth rate of 2.3%.

Table 0-5: Population Projections for Nadaun Planning Area by five different methods

( )

Population

Forecasting Method

(i)

201

6

(ii)

202

1

(iii)

202

6

(iv)

203

1

(v)

203

5

(vi)

Arithmetic Increase

(vii)

107

21

(viii)

114

51

(ix)

121

80

(x)

129

09

(xi)

136

38

(xii)

Incremental Increase

(xiii)

104

58

(xiv)

107

48

(xv)

108

62

(xvi)

108

00

(xvii) 105

63

(xviii) Compound

Average Growth

Rate

(xix)

111

06

(xx)

124

43

(xxi)

139

41

(xxii) 156

20

(xxiii) 175

01

(xxiv) Geometric Increase

(xxv) 109

01

(xxvi) 118

93

(xxvii) 129

74

(xxviii) 141

55

(xxix) 154

42

(xxx) Exponential Increase

(xxxi) 109

88

(xxxii) 120

83

(xxxiii) 132

87

(xxxiv) 146

11

(xxxv) 160

67

Source: Projected based on the Last Three Decades Population

Figure 0-5: Population Projections for Nadaun Planning area by five different methods

Source: Projected based on the Last Three Decades Population

3.4 Settlement Pattern

3.4.1 Proposed Settlement Hierarchy and Facilities for 2035

Settlement planning at the sub-regional level shall be linked with on-going development process in

the region and shall focus on integration with socio-economic development.

Hamirpur is a regional trade and educational centre, increasing trade and commercial activities with

potential for allied agro/forest based industries in the vicinity have strong bearing on its future

growth. Hence, Nadaun will also come under its influence, which will trigger the economic activity

and trade between the cities and region.

Balanced settlement development strategy is essential for envisaged economic growth of the region

and the planning area.

2035

8391

jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939

Above objective can be achieved, if the following points are kept in view:

A balance, well-knit pattern of settlements system

Evenly distribution of infrastructure facilities

A road network system connecting higher order settlements with lower order

Evenly distributed, economic centre for balance economic development sub-region

Transport network

As the only growth centre in the planning area is Nadaun town, hence it will be going to become

the only urban centre for the whole planning region. With Nadaun as a centre, Bela and Tillu

Pratham with projected population of 3814 and 470 respectively, will become a part of the urban

agglomeration as they are in the vicinity of the Nadaun town. Some more growth centres like Tillu

Khas (1650), Jalari Saunkhlan (1257), Kuthar (903) having high infrastructure facilities which will

also grow with time.

The Proposed Settlement Pattern on the basis of population is as follows:

a)

Urban Centre

The first order hierarchy settlement is Urban Centre with a population range of 10,000-

20,000. It shall act as small town having linkages with immediate rural hinterlands. This

urban centre would cater to the rural hinterland as agro-service centre in the collection and

distribution of agricultural goods and services.

It would work as a nodal centre of resource based activity centre, trade and commerce,

administration, etc. The centre would have adequate infrastructure facilities with adequate

resources in quantity and quality.

Hence, Nadaun Town with two adjacent villages of Bela and Tillu Pratham would form the first

order of settlement.

b)

Growth Centres

The Growth Centre seeks to bridge the rural urban divide. The estimated population for the

Growth Centre is 5,000-10,000. The Growth Centres are the higher order village having

central location and potential for development within its catchment area, with relatively

better services and facilities in terms of education, health, communication, accessibility.

Table 0-6: Proposed Growth Centre in NPA

S. No.

Proposed Growth Centre

1

Kuthar

2

Tillu Khas

3

Jalari Saunkhlan

c)

Basic Village

All other villages have been identified as basic villages and will be provided with basic

facilities like link roads, water supply, electricity and some basic social infrastructure.

8392

jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939

(xxxvi)

Figure 0-6: Proposed Settlement Pattern

Table 0-7: Proposed Settlement Hierarchy and Proposed Facilities in Nadaun Planning Area -

2035

Level

Settlement Level

Catchment

range

(in Km)

Total

population

served

Education facility

Health

Recreation

Shopping

Road

connectivity

1

Urban Centre

- Nadaun NP

- Bela

- Tillu Pratham

10 to 15

10,000-

20,000

Vocational training/ Polytechnic

Maternity and Family Welfare Centre

Recreational

spaces/

Play grounds

Shopping

centre/

Community

welfare

centre

Road

connectivity to

other villages

and Growth

centres

2

Growth Centre

- Tillu Khas

- Kuthar

- Jalari

5 to 10

5,000-10,000

Primary school/ Secondary school

Dispensary/ health sub centre/

family welfare centre

Mela ground/

cremation

ground

Informal

Bazaar

Road

connectivity

from the Town

to the Basic

villages

3

Basic Village

- Kalan

- Mandala

- Rukwalan

- DPG Tillu

- Gagaal

Within the

village

< 5,000

Pre- Primary and Primary school

Dispensary/

health sub centre

Basic

community

space

Daily need

shop

All weather

pucca road

Source: Proposed based on URDPFI Guidelines, 2017

4

Economic Base and Employment

4.1

Economic Base

Nadaun has an agricultural based economy with more emphasis on trade and commerce due to its

locational and geographical advantage in the region.

NH - 3

NH -

3

NH -

303

8393

jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939

4.2

Employment

4.2.1 Work Participation Rate (WPR)

The total number of workers in the Planning Area is 4544 (2011 Census). The Work Participation

Rate (WPR) is 46% which is lower than the district average i.e. 53% in 2011. The WPR has

significantly increased from 32% in 2001 to 46% in 2011 which is more than the district average

increase.

4.2.2 Main and Marginal Workers

The total workers are distributed into main and marginal works. Increase in marginal workers in an

area indicates a poor trend of economic growth. In case of Nadaun Planning Area, Nadaun town

has 59% (1142) of main workers and 41% (779) marginal workers as per Census 2011 whereas the

rest of the planning area have 72% (1896) of main workers and 28% (727) of marginal workers.

Nadaun has a large informal sector as well which is why the town area has more of marginal

workers. Marginal workers have increased from 30% in 2001 to 33% in 2011.

4.3 Occupational Structure

Out of the total worker in the planning area, maximum workers (56.64%) are engaged in tertiary

activities as the town is located at the cross junction of two main highways and has prosperity in

trading. After tertiary, primary sector is the next priority sector with 41.64% workers engaged in

farming and forestry activities due to its predominant rural character. Negligible numbers of people

(1.72%) are engaged in secondary sector, comprising of household and micro scale units.

Figure 0-1: Workers Distribution

Source: Census of India, 2011

Table 0-1: Occupational Structure of Nadaun

Sector

Occupation

Percentage of Workers

Primary Sector

Agriculture, Forestry and Fishing

42

42

Secondary Sector

Manufacturing and Repairs

2

2

Tertiary Sector

Construction Activity

30

56

Trade and Hotels

10

Banking Facilities

6

Public Administration

6

Transportation and Communication

4

Source: Census of India, 2011, Economic Survey, 2005-06

4.4 Sector wise Analysis

The sector wise analysis is very important to understand the potential economic sector in the

planning area and proposals to be formulated for strengthening the same.

8394

jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939

4.4.1 Primary Sector

As it has already been discussed that the second most important economic sector is the primary

sector in terms of occupation structure (42%).

Primary sector is also, the second important sector in terms of the GDDP share during the last

decade as well. Out of the total GDDP share, primary sector shared 19% during 2000-01. The share

of primary sector in GDDP, has decreased over the period of time. During 2005-06 the share of

primary sector fell to 14% and during 2009-10 to 11%. This is clear from the above data that

people are shifting from primary sector to other sectors for the employment purposes. In spite of

the above-mentioned fact, it is very important to study the primary sector as the rest of sectors are

directly or indirectly dependent on it.

4.4.1.1 Agriculture

Agriculture is one of the main occupations of people in Nadaun Planning Area. Out of the total

primary workers 85% are engaged in agricultural activities. The sub-humid sub-tropical climate

along with sandy loam soil favour cultivation of any crops in the region. The main cultivated crops

are maize (75%) and paddy (25%) during Kharif season and wheat during Rabi season. Farmers,

having irrigated land, have also switched to cash crop farming like fruits and vegetables.

The total cultivable land available in the planning area is 341 ha which accounts almost 38% of the

total land of Nadaun Planning Area. The amount of cultivable land in the planning area is less than

the block average (Nadaun Block) i.e. 59%. Out of 341 ha, 334 ha (98%) is under agricultural use

and 6.89 ha. (2%) is under horticultural use.

The total irrigated area to total cultivated area is 34% which is more than the district average. The

main irrigation sources are khads and the Beas River.

From the Figure 0-2, it is evident that the agricultural lands are distributed uniformly in the entire

planning area. The patches are mainly seen near Man khad and the river. The soil at those places

are lose and porous which is suitable for cultivation.

In terms of production and trade, maize is the main crop which is produced largely in the area and

in the district as well.

The maize production has been increased from 13-15 quintals per hectare in 2011 to 18-20 quintals

per hectare in 2015. The growth in maize production is almost same as the district average growth.

Simultaneously, the production of wheat has also been increased from 15-16 quintals per hectare in

2011 to 20-23 quintals per hectare in 2015.

Very little amount of vegetable is also produced in the area but that is for local level use only which

is why the record is not available. There is no surplus remains which can be traded further.

A small local level mandi functions from Nadaun town where the trading items are maize and

wheat. The market rate of maize is 800-1000 rupees/ quintals whereas for wheat it is about 1500

rupees/ quintals.18

4.4.1.2 Horticulture

The main horticultural crop in the region is citrus fruits like oranges, lemons, amla etc. Other than

the citrus fruits, mangoes and galgal are also produced in the region. Out of the total cultivable area

18 Agriculture Department, Block Development Office, Nadaun Block, Hamirpur

8395

jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939

in Nadaun Planning Area, only 2% area is under the horticultural use. Area under horticultural use

in Nadaun block is 1040 ha out of which 6.89 ha (0.67%) is inside the Planning Area. The

horticultural production in the block is presented in Table 0-2.

Table 0-2: Production of Horticultural Crops

(xxxvii) Year

(xxxviii)

Production (MT)

(xxxix) 2011-12

(xl)

65

(xli)

2012-13

(xlii)

70

(xliii) 2013-14

(xliv) 80

(xlv)

2014-15

(xlvi) 68

(xlvii) 2015-16

(xlviii) 100

Source: Department of Horticulture, Block Development Office, Nadaun Block, Hamirpur

The production of horticulture crops in the block is showing an upward trend from 2011-12. During

2014-15, the production has gone down due to the natural calamities in the area. After that the

growth has improved in the next year.

(xlix)

(l)

Figure 0-2: Agricultural Area in Nadaun Planning Area

(li)

Source: AGiSAC Base Map 2015

NH – 3

NH

– 3

NH

–

303

8396

jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939

4.4.1.3 Sericulture

Sericulture is another importance sector in the economy of Nadaun. There are two major

Sericulture farms in the planning area. One is located Bela village and the other just opposite Post

Office. Though currently these farms are not in operation, it is proposed to revive these farms to

generate employment and revenue through the interventions of Sericulture Divisional Office-

Nadaun, Directorate of Industries, H.P.

Secondary Sector

Secondary sector is the least prioritized sector in Nadaun Planning Area in terms of occupational

structure and GDDP share.

Secondary sector shares only 3.5% of the total GDDP in 2000-01 which has decreased to 3.2% in

2005-06 and to 3% in 2009-10. This continuous drop of share in district’s GDDP amount clearly

indicates that the sector is not a growing sector in this region.

In case of Nadaun, as there are no manufacturing industries only micro scale repair units and some

household industries are operating at the local level whose contribution to economic development

is negligible.

Tertiary Sector

Tertiary sector or the service sector is the most important sector in the planning area in terms of

occupational structure and share in GDDP amount.

In terms of GDDP share, tertiary sector has the maximum percentage share in the total GDDP since

1999-00. The share of tertiary sector in 2000-01 was 78% of the total GDDP of Hamirpur district

which have increased to 84% in 2005-06 and to 87% in 2009-10.

The main activities in tertiary sector in Hamirpur District are constructions (54%), trade and hotels

(16%), banking facilities (11%), public administration (10%) and Transportation (7%).

Figure 0-3: Share of Activities in Tertiary Sector

Source: Economic Survey, 2005-06

Most of the employed people in Nadaun Planning area are engaged in Private services (43%) or

own Business (43%), and rest of the people (14%) are engaged in govt. services. (According to the

5% sample survey in the planning area).

8397

jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939

Figure 0-4: Occupation Structure of Employed People

Source: Field/Primary Survey

From the above analysis, it can be concluded that the main priority sector is the tertiary sector

which generates maximum district domestic product and more than 50% of the people are engaged

in various service sector related activities.

4.4.3.1 Trade and Commerce

Nadaun historically has being a trading centre and has commercial-cum-mixed use within the old

town. Nadaun is also known as the ‘Pattan’ town due to its specialized in trading activities.

There are two markets in Nadaun. One is the old market area which is sited at the heart of the town

and another one is the new market which has been set up near the bus stand. The old market area is

basically a whole sale market specializing in wedding ceremony related articles/ items, clothes,

shoes etc. whereas the new market deals in items related to modern day to day articles like

electronics, mobiles, hardware, electrical apart from eateries and general grocery shops.

Commercial activities have also spread along the major spine within the present Nadaun town as

well as along the National highway. Apart from the major commercial facilities, the local shopping

facilities are available within the residential areas to meet the daily needs of the people.

In order to cater to the transit people arriving at the Nadaun bus stand, there are a couple of

restaurants and sweet shops in bus stand area of the new market area also.

4.5

Income Structure

Income structure helps us to understand the range of people’s income in a region. It helps us to

comprehend about the economic capability or purchasing power of the people.

The Figure 0-5 shows that maximum respondents (38%) have the income level between 5000 to

10000 rupees per month. A person with up to 5000 rupees per month income level constitutes 34%

of the total earning sample population. As 72% of the total earning population lie within the two

income groups i.e., up to 10000 rupees per month, it is in consonance with the per capita income of

the state i.e., Rs. 51730 in 2012-13.

Figure 0-5: Income Structure

Source: Primary Survey

8398

jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939

4.6 Employment Generation

Considering that the Development Plan will boost the economic activities within the Planning area

and create more opportunities for work, it has been estimated that there would be at least 5% boost

in the WPR. Thus, the Planning area will have a WPR of 51% by 2035. The worker population

estimated by 2035 will be 8926. The following Table.0-3 shows the break-up of the employment

generated in each sector.

Table.0-3: Proposed Occupational Classification of Nadaun

Sector

Occupation

Number

of

Workers

Percentage of

Workers

Primary sector Agriculture, Forestry and Fishing

3125

35

35

Secondary

Sector

Light Industries and Composite use zone

446

5

10

Agro- based industries

446

5

Tertiary

Sector

Construction Industry

1339

15

55

Govt. offices

893

10

Institutional areas

446

5

Town Centre

446

5

Wholesale Trade (Integrated Freight Complex)

893

10

Transportation Hub

446

5

Retail Sector

446

5

TOTAL

8926

100

Source: Proposed based on Analysis and Trend

4.7

Proposed Work Areas

4.7.1 Light and Service Industries

The town needs an industrial base presently a very limited number of service industries constitute

the industrial sector of Nadaun.

Nadaun broad region would provide the skilled, unskilled and semi-skilled labour required for agro

as well as other light and service industries. Light flatted group industries shall be permitted in the

area demarcated for industries. Industries like Agro-based, Fisheries and Dairy processing,

Furniture making, Engineering Products /Repair and Maintenance etc. are the sectors which is

proposed to increase the Economy.

Thus an area of 10.27 Ha has been proposed in Tillu Khas to be developed as an Industrial Estate.

Mandi/ Wholesale complex

A mandi or whole-sale trade complex is proposed at the junction of NH-3 and MDR-36. The

Development Plan proposes to develop a 1.29 ha new Mandi Complex including Wholesale

Markets at Jalari. This location provides appropriate linkages for the incoming goods, outgoing

goods and distribution of wholesale goods in the town.

This will also include activities closely related to trade like financial institutions, administrative

services, business entrepreneurship, people related retail market facilities and other public

conveniences.

A Vegetable packing house, Cattle Feed Godown and a Cold Storage is also proposed in the town

by TCPD under Annual Administrative Report (2014-15).

8399

jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939

4.7.3 Retail

Retail shopping areas are necessary for creating an image for any town. Presently there are no

organized retail areas in the planning area. To accommodate the required shopping, commercial

offices, and other activities like cinema, hotel and related facilities, the following three-tier system

of commercial development is proposed.

Level I

Town level

Level II

Community level

Level III

Neighbourhood level

4.7.3.1 Level I –Town Centre

One town centre is envisaged and strategically located to serve the town. The town centre is

proposed to be developed at Tillu Pratham village. It will be developed on 5.7 ha of land (2.3 for

commercial and 3.4 ha for public semipublic use).

4.7.3.2 Level II –Community Centre

The Community centers are major shopping complexes, which will comprise of Shops, Weekly

Markets, Post office, Dispensary, Petrol Pump and are also the centers of socio-cultural activities

where the people get together. One Community Center have been proposed in the Development

Plan for a population of 15,000 of an area of about 0.50 hectares.

4.7.3.3 Level III – Neighborhood shopping centers

Within the residential land use, in new developments, two categories of shopping centers shall be

provided:

Sector-level shopping centre-45 to 50 shops for a population of 5000 persons.

Convenient shopping centre-10 to 15 shops for a population of 1000 persons.

4.7.3.4 Informal sector

The informal sector trade and services are scattered within the Planning area. The informal sector

units locate themselves strategically near work centers, commercial areas, outside the boundaries of

schools, colleges and hospitals, transport nodes and near large housing clusters. It is proposed to

integrate the informal sector in trade and services in the planned development.

In all the future developments, 1% of the total area will be reserved for informal sector/ vendor

market development. This area shall have temporary construction not to be included in coverage

and FAR. At appropriate locations, reservations shall be made for night shelters. Attractive design

shall be prepared for the space for stationary and mobile vending.

4.7.3.5 Weekly markets

The weekly markets and haats are a vital characteristic of Indian cities and have a sense rich

cultural identity attached to them. Spaces shall be allotted for weekly markets in the town centre

area.

Site with an area of about 0.4 Ha for weekly markets is included in the town centre.

8400

jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939

5

Housing

5.1

Introduction

The population of Nadaun Planning Area as in census 2011 is 9,912 and the number of Households

is 2219. To understand the housing condition and situation of Nadaun Planning area a survey of 5%

household was conducted in February 2016. 111 household were surveyed. Apart from socio-

economic aspect housing characteristics were also studied.

(lii)

Figure 0-1: Settlements in the Planning Area

Source: Base map provided by AGiSAC

NH – 3

N

H

– 3

NH

–

303

8401

jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939

5.2 Household Size

Nadaun Planning Area has a household size of 4.5 as per Census of India, 2011. Table 0-1 shows

that the household size has decreased from 5.2 in 1991 to 4.5 in 2011.

Table 0-1: Year wise population in the Planning Area

(liii)

Year

(liv)

1991

(lv)

2001

(lvi)

2011

(lvii)

Population

(lviii) 7075

(lix)

8885

(lx)

9912

(lxi)

No. of HH

(lxii)

1348

(lxiii) 1804

(lxiv) 2219

(lxv)

HH size

(lxvi) 5.2

(lxvii) 4.9

(lxviii) 4.5

Source: Housing Census, Census of India

5.3 Housing Typology

There are majorly three type of housing typologies found in the planning area:

Courtyard houses

Row houses/ semi-detached houses

Detached houses

The Nadaun town being an old settlement has majorly courtyard houses with minimal setback and

large courtyard in the centre / towards the rear side used for agriculture, cattle sheds or for other

household activities

With the implementation of TCPD Rules, new houses or redevelopment of the old housing stock is

proposed to be re-constructed in the form of row houses or semi-detached houses depending upon

the area of the residential plot in the Nadaun town.

The rest of the planning area mostly have detached houses apart from abadi areas where courtyard/

row houses and semi-detached houses are also observed.

5.4

Condition of Housing

Census of India has classified the condition of housing into three categories namely good, liveable

and dilapidated. As per Census 2011, 80% of the houses are in good condition, 14% are liveable

and 5% are in dilapidated condition. There is a need of new housing stock to replace the dilapidated

houses and cater to the housing demand of the planning area.

Figure 0-2: Condition of Houses

Source: Census 2011

8402

jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939

5.5

Age of Structure

According to the primary survey conducted 54% of the houses were built more than 20 years ago

and only 23% of the houses are built less than 10 years ago. As Nadaun is an old town most of the

houses are traditional and more than 20 years old.

Figure 0-3 Age of Structure in Nadaun Planning Area

Source: Primary Survey

5.6 Structure Use

The structure use pattern as categorized by Census 2011 shows that, 98% of the total houses in

Nadaun are purely residential and only 2% have mixed use (residential cum other use). The

residential cum other use structures are located in the old market area (Pattan Bazaar) within the

Nadaun town as well as along the National Highway.

5.7 Type of Structures

Census of India was classified into permanent, semi-permanent or temporary based on the type of

material use in construction of wall and roof. In Nadaun, nearly 68% houses are permanent, 23%

houses are semi-permanent and (9%) houses are of temporary structure.

Figure 0-4: Type of Structures

Source: Census 2011

5.8 Building Material

As per primary survey it is observed that about 75% households have RCC roof on their house;

nearly 20% have tiled roof and another 5% have ‘Grass’ thatch, etc., as the material for the roof.

For wall, nearly 91% households have reported use of ‘Burnt brick’ and about 8% ‘Mud / unburnt

brick’. Nearly 89% households have cement flooring and about 11% households have mud

flooring.

8403

jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939

Figure 0-5: Material of Roof

Source: Primary Survey

Figure 0-6 Material of Floor

Source: Primary Survey

Figure 0-7: Material of Wall

Source: Primary Survey

5.9 Dwelling Unit Size

The quality of life of a person depends (among other factors) upon the size of dwelling unit

available to them. According to the Census 2011, 27% of the household live in 2 room dwelling

unit. 20% households live in 3 room dwelling unit. 15% households live in one room dwelling unit.

As the household size for Nadaun is 4.5, for good living conditions at least a two room dwelling

unit is essential. 15% of the households are living in smaller dwelling unit hence, these deprivations

require urgent attention.

Figure 0-8: Dwelling Unit Size

Source: Census 2011

8404

jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939

5.10 No. of Stories

According to the primary survey most of the housing is plotted housing with average plot size

ranging from 500 to 1000 square feet. The structures are predominantly ground floor with a few

buildings having two to three-storied structures.

5.11 Ownership Status

As per Census 2011, 94% of the houses are owned and remaining 5% of the houses are occupied by

tenants, this indicates most of the people of Nadaun are natives and permanent residents of the

town. As the in-migration is increasing in the planning area, there has been an increase in the

demand for rental housing as per the primary survey.

Figure 0-9: Ownership Status

Source: Census 2011

5.12 Housing Need

The demand of housing in the year 2035 is calculated on the basis of projected population,

household size and current housing shortage. The Development Plan proposes to facilitate the

provision of a fully serviced dwelling unit for each family and reduce the gap between housing

shortage and supply through suitable measures.

Table 0-2: Housing Forecast

Population 2011

9,912

Population 2035

17,501

Additional Population 2035

7,589

Household Size

4.5

Additional Housing Need

1,686

Present Housing Shortage - Due to

Dilapidated and Temporary

Structures

311

Total Housing Need

1,997

Source: Estimation based on Census data

The forecast has been based on the following assumptions:

1.

Anticipated population growth as per the growth rates assumed;

2.

Constant annual household formation rate for the entire Planning Area;

3.

Replacement of dilapidated (5%) and temporary structures (9%).

The additional housing units shall be provided in the following manner:

New Residential Developments: 1,686 dwelling units

Infill in existing residential areas: 311 dwelling units

Table 0-3 gives the details of housing needs every five years and shows the housing need zone

wise.

8405

jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939

Table 0-3: Year wise Housing Need

YEAR

Additional Population

Additional HH

Housing Need

2016

1194

265

576

2021

2531

297

297

2026

4029

333

333

2031

5707

373

373

2035

7589

418

418

TOTAL

1686

1997

Source: Estimation based on the Census Data

5.13 Housing Strategy

Planning norms, land use zoning, density, FAR, and building controls have been reviewed for

housing, both in new areas to be opened up development and for redevelopment of existing areas.

In the context of housing strategy, it is essential to optimise utilization of land and space with a

view to increasing net residential density.

There are following aspects that should be focused for new public housing development –

Strategy for Land Assembly/ pooling

Finance and Incentives

Human Resource Management and E-governance

Public Private Partnership and People Public Private Partnership model

Retrofit measures to make the existing building stock energy efficient and to overcome the

various environmental challenges posed by the sector.

Retrofitting of dilapidated houses- In case of dilapidated structures, if structure is below

50 years, it should be retrofitted, if structure is above 50 years, it should be demolished and the

occupants should be relocated.

The additional 1997 housing units can be achievable by the participation of Government

Departments/Agencies and Private Agencies under the following strategies-

i)

State Government should provide proposed developable land in the Development Plan

for government agencies and private sectors.

ii)

Major infrastructures like major roads, water supply lines, sewage layout, power lines

and other basic infrastructure to be developed.

iii) Private sectors should be encouraged to construct new houses with basic infrastructure

as per requirements.

iv) Use of local available building materials should be encouraged by the government.

v)

More development in the central part of planning area to be avoided except the areas

where proposals have been given in Development Plan.

vi) Clearance of Building Plan and Land Development/Layout Plan before construction/

development should be strictly imposed by the Government under the Himachal

Pradesh Town and Country Planning Rules, 2014.

Strict compliance of the Building Regulations should be enforced by the authority, in regard to the

following-

•

Structural Design

•

Structural Design Basis Report

•

Seismic Strengthening/Retrofitting

•

Certification Regarding Structural Safety in Design

•

Constructional Safety

•

Quality Control and Inspection

8406

jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939

•

Structural Requirements of Low Cost Housing

•

Inspection

5.13.1 Housing for Various Income Groups

The Development Plan recommends identification of priorities in dealing with different segments

of the population. Out of the total demand, income category wise demand would be as given in

Figure 0-10. Fixing the priority in dealing with different segments of the population:

1.

H.I.G. and M.I.G. dwelling units shall be provided with only developed land at market price

to cross subsidize the housing for E.W.S./L.I.G.

2.

L.I.G. and E.W.S. should be covered under site and services scheme and finances provided

through various centrally and State sponsored schemes.

Figure 0-10: Housing demand as per income category

Source: Census of India

On the basis of the emerging trend in the proportion of population occupying 1-2 rooms, 3-4 rooms

and 5-plus rooms by comparing the 2001 and 2011 Census data, a distribution in the above

categories for 2035 have been projected as under

Table 0-4: Proposed Distribution of Households by Housing Category

Category

No. of Rooms

Proportion of Households

2001

2011

2035

E.W.S./ L.I. G

1-2

58%

42%

26% (519)

M.I.G.

3-4

29%

38%

47% (939)

H.I.G.

5+

13%

20%

27% (539)

Source: Estimation based on the study

Housing by Various Agencies

On the basis of the above studies, a possible indicative scenario in terms of housing supply by

different agencies emerges as under:

Table 0-5: Distribution of Housing by Supply Agencies

Agency

Housing Categories

E.W.S./L.I.G

M.I.G.

H.I.G.

HIMUDA

80%

20%

-

Employee/Cooperatives

12%

50%

30%

Private

8%

30%

70%

Source: Estimation based on the study

8407

jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939

Employee housing by the government bodies such as HPSEB, IPH, etc. will come up initially

which follows the emergence of cooperative societies by the Private developers and Builders in the

future.

6

Traffic and Transportation

6.1 Road Network

Nadaun Town, located at the north-western side of Hamirpur district, is accessible by two NHs viz.,

NH-3 (known as Atari-Manali Highway) which connects Nadaun with Amritsar-Jalandhar-

Hoshiarpur-Hamirpur-Mandi-Kullu and NH 303 (known as Nadaun-Nagrota Road) which connects

Nadaun with Nagrota via Ranital-Jwalamukhi. Nadaun is well connected with Sujanpur, the Tehsil

headquarter of the neighbouring Tehsil by MDR-36.

6.2 Road Inventory

About 5.24 km and 1.52 km of NH-3 and NH-303 passes through the planning area respectively.

Out of the total length of NH passing through the planning area, 2.02 km stretch of NH-3 and 0.86

km of stretch of NH-303 act as the urban road in Nadaun town. The NHs are two lane undivided

roads in the planning area with 1.5m shoulders on the both sides. The NHs have an average ROW

of 10m with 7m carriage way with 1.5m earthen shoulders on both sides used as parking, footpath

and service corridor. There are no walkways inside the planning area and vehicles are parked along

the road. This creates a lot of congestion inside the urban area.

The length of the MDR 36 passing through the planning area is 630m. It is a single lane road with

5m carriage way and 1m earthen shoulder at both ends.

The roads in the planning area have been made according to required standards set by NHAI and

IRC.

6.3 Road Condition

The road condition in the planning area is satisfactory in terms of the materials used for the

construction of roads and the level of maintenance.

The roads in the planning area are constructed and maintained by multiple authorities. NHs are

maintained by NHAI which are entirely metalled roads. However, some portions near Gagaal

(almost 200m to 400m) are under construction that creates delay in the traffic movement and

produces dusts which reduces the visibility. The MDR and ODRs are maintained by PWD. Under

PWD, 93% roads are metalled and rest are non-metalled roads.

The other urban roads are maintained by PWD and Nagar Panchayat while the village roads are

maintained by PWD and respective Gram Panchayat.

Three types of roads can be seen in Nadaun Nagar Panchayat in terms of material used i.e.

Bitumen, Concrete and Earthen roads. Out of the total roads, 90% are made of concrete, 7%

bitumen and 3% earthen. The 3m (10ft.) wide roads/streets are mainly bitumen made. All the

bituminous roads in the Nagar Panchayat Area are 3m wide.

8408

jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939

The following table shows the different types of roads in Nagar Panchayat Area and their lengths

and width.

Table 6-1: Village Roads, Nadaun Planning Area

S.

No.

Village Name

Length of the Roads

as per Base Map(In

Metres)

Remarks

1

Kot

6330.37

Both side drains on 0.9-1.0 km of road

length

2

Seri

4759.90

Both side drains on 500m of road length

3

Dolee Gharan

1259.49

-

4

Nagarada

2404.46

-

5

Kuthar

1710.19

1000m Kutcha road

6

Bharmoti Kalan

3892.25

Both side drains on 3000m of Kutcha

road

7

Jalari Saunkhlan

1186.49

Construction of both side drains in

progress

8

Harmandir

Mandiala

2199.32

Kutcha drains

9

Harmandir

Rukwalan

381.75

Kutcha drains

10

Bela

11801.73

300m of Pucca drains rest Kutcha

11

DPF Kuthar

651.21

-

12

DPF Tillu

1441.42

500m of pucca road rest Kutcha

13

Tillu Pratham

9.93

500m of kutcha road rest pucca

14

Tillu Khas

2776.61

500m of kutcha road rest pucca

15

Gagaal

621.82

500m of kutcha road rest pucca

TOTAL

41426.94

Source: Sub-divisional Office, PWD, Nadaun

Figure 6-1 Types of Materials

Source: PWD office, Nadaun

8409

jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939

Table 6-2: Roads Maintained by Nagar Panchayat

Source: Nagar Panchayat, Nadaun

As per the residents during the primary survey, during rainy season the un-metalled roads create

problem for pedestrians as well as vehicle users the. The rolling topography reduces the durability

of the earthen roads.

6.4

Vehicle Growth

Vehicular growth rate in the region puts light on the fact of future traffic pattern. Increase in the

number of private vehicles envisages the increase in the traffic volume in the town. It would put

more pressure on the existing roads and creates congestion on a larger run if necessary measures

are not taken.

The, depicts the average annual growth rate is 9% from 2011 to 2015. The highest growth rate was

experienced in 2013. After that, there is a steady fall in overall vehicle growth till 2015.

The maximum registered vehicles are mainly the two wheelers (71%) and cars (21%).

Tractors, HGVs, three wheelers and others fall in the remaining (8%). This clearly illustrates the

local roads occupied by the two wheelers and cars. The percentage of buses is very less. Only 18

buses have been registered in the last five years.

Types of

Roads

Length of different roads

Total Length (km)

Percentage

3m (10ft)

2.5m (8ft)

1.8m (6ft)

Bitumen

1.31

-

-

1.31

7.29%

Concrete

2.20

5.50

8.48

16.18

89.99%

Earthen

-

0.18

0.31

0.49

2.72%

Figure 6-2: Vehicle Growth, 2011 to 2015

Source: SDM Office, Nadaun

8410

jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939

6.5

Existing Traffic Scenario

Traffic survey has been conducted for 12 hours for three days in February 2016 in Nadaun Planning

area to understand the traffic scenario in and around the planning areas. The surveys have been

conducted at three outer cordons on NH-3 and NH-303 to capture the through, outgoing and

incoming traffic. The two types of surveys conducted viz., Origin and Destination survey and

Traffic Volume Count Survey has been conducted for assessment of passenger and freight traffic

and to measure Level of Service respectively. The traffic survey was conducted at Beas Bridge on

NH-3 and near Jalari village on NH-303 and at Amb Road again on NH-3.

6.5.1 Traffic Pattern

(53%). About 24% of total trips terminate at Nadaun and another 19% trips are generated from

Nadaun. The share of trips within Nadaun account to only 4%. This is to be noted that the planning

area gets maximum through traffic daily.

6.5.2 Traffic Volume

The volume of traffic is highest at cordon point 1 i.e. the Beas Bridge point (6609 PCUs) which

connects the Kangra district with Hamirpur district. Thereafter the traffic gets bifurcated into two.

One goes towards Hamirpur-Sujanpur-Bilaspur and then towards Shimla and another goes towards

Amb-Una and then to Chandigarh. This is the reason, cordon point 2 and cordon point 3 get half of

the traffic volume than of cordon point 1. i.e., 4384 PCUs and 5564 PCUs respectively.

6.5.3 Modal Split

There is maximum two wheelers (44%) share followed by car (35%) and. HMV (passengers) i.e.

the buses follow after two wheelers and cars with average share of 6% at three different points.

LMV (goods) and HMV (goods) account for 6% and 5% to the total modal share respectively.

6.5.3.1 Level of Service (LOS)

The Level of Service (LOS) of two lanes highway with earthen shoulders has been presented in

Table 6-3.

Figure 6-3: Vehicle classes

Source: SDM Office, Nadaun

8411

jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939

Table 6-3: Level of Service in terms of Traffic Volume

Days

Traffic Volume in PCUs

at Point 1

V/

C

Level

of

Servi

ce

Traffic Volume in PCUs

at Point 2

V/

C

Level

of

Servi

ce

Traffic Volume in PCUs

at Point 3

V/

C

Level

of

Servi

ce

Day 1

7609

0.7

2

(C)

4447

0.4

8

(A)

6243

0.6

1

B

Day 2

9083

4163

5765

Day 3

3134

4541

4685

Avera

ge

6609

4384

5564

Source: Primary Survey

Cordon point 1 i.e. Beas Bridge which connects Nadaun with Kangra district has category C Level

of Service. Cordon point 2 i.e. the Jalari road which connects Hamripur has category A Level of

service and cordon point 3 i.e. the Amb road which connects Nadaun with Amb and Una has

category B Level of Service.

As per the present Level of Services, the Nadaun-Amb section of the NH-3 passing through the

Planning Area has a stable flowing, at or near free flowing traffic. The ability to maneuver through

lanes is noticeably restricted and lane changes require more driver awareness. Most experienced

drivers are comfortable, roads remain safely below but efficiently close to capacity, and posted

speed is maintained.

The Nadaun-Hamirpur section of NH-3 is reasonably free flow. Traffic speeds are maintained,

maneuverability within the traffic stream is slightly restricted. Motorists have a high level of

physical and psychological comfort.

The Nadaun-Nagrota section of NH-303 passing through the planning area has free flowing traffic.

The traffic flows at or above the posted speed limit and motorists have complete mobility between

lanes. Motorists have a high level of physical and psychological comfort.

8412

jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939

Figure 6-4: Present Level of Service of Different Roads

Source: Analysis based on Traffic Survey

8413

jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939

Table 6-04: Level of Service Criteria

Level

of

Service

Description

V/C

A

Free-flow conditions with unimpeded maneuverability. Stopped

delay at signalized intersection is minimal.

0.00 to 0.60

B

Reasonably unimpeded operations with slightly restricted

maneuverability. Stopped delays are not bothersome.

0.61 to 0.70

C

Stable operations with somewhat more restrictions in making mid-

block lane changes than LOS B. Motorists will experience

appreciable tension while driving.

0.71 to 0.80

D

Approaching unstable operations where small increases in volume

produce substantial increases in delay and decreases in speed.

0.81 to 0.90

E

Operations with significant intersection approach delays and low

average speeds.

0.91 to 1.00

F

Operations with extremely low speeds caused by intersection

congestion, high delay, and adverse signal progression.

> 1.00

Source: Transportation Research Board, Highway Capacity Manual

6.5.4 Trips

Commercial and Business trips accounts for 67% of the total freight trips in the Planning Area

where as social trips account for the maximum passenger trips (80%).

Almost 80% of the internal trips i.e., within Nadaun are completed within 15minutes time period. It

indicates the work place or other level of services are not very far from the houses in the Planning

area. Most of the trips are generated from Nadaun Town and Beal village (64%) and terminated in

Nadaun Town, Gagaal and Jalari (70%). Out of the total internal to internal trips, 59% trips are

made for business purpose and 41% trips are made for work purposes.

Figure 6-5: Mode of Transport Usage

Source: Primary Survey

8414

jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939

Out of the total household trips, 65% people walk to the destination whereas 15% use public

transport (bus) to commute to destinations, 13% use two wheelers and 5% use cars. Very few (2%)

use cycles as a mode of transport.

6.6

Public Transport System

Nadaun town has efficient intercity public transportation system. Public transport is used for

commuting to long distances like Kangra, Hamirpur, Amb-Gagret, Sujanpur, Dhera, Shimla,

Chandigarh etc.

The transportation within Nadaun and surrounding areas is based on privately and government

operated buses. Nadaun has a large bus station (bigger compared to towns of similar size in this

area). A taxi stand is adjacent to it where one can easily rent a taxi for commuting short or long

distances.

6.6.1 Bus

Bus is the main mode of public transport in Nadaun. The town is well-connected with important

towns and centres within and outside state by govt. roadways (HRTC) and private buses, Nadaun

has a designated bus terminus located in the centre of the city at Inderpal Chowk.

Buses are available in every 20 to 25 minutes for the neighbouring towns, located within 50km. like

Hamirpur, Sujanpur, Amb, Una, Jwalamukhi, Galore, Kangra etc. Towns located within 100km,

have bus connectivity in every 60 to 90 minutes. Towns sited beyond 100 km. have bus services

twice or thrice from the town. There is also a Volvo bus service operated by HRTC with connects

Nadaun with National Capital of Delhi daily.

There is no intra-city public transport system in Nadaun.

6.6.2 Ferry

Though Nadaun does not have a well-developed inland waterways system. But, there are two row

boats which ferry people across the Beas River. Such facility is available on two sides of the

planning area. One on the north-western side near Pattan Bazaar adjacent to present day SDM

Office and the other on the north-eastern side near the Nadaun Fort. There is a nominal fee charged

to ferry people from one side to the other.

6.7 Parking Facility

There is no designated-on street or off-street parking spaces available in the town or the planning

area. The taxi drivers mainly park their vehicles at the Kharidi Ground near the bus stand. The

Kharidi ground is used primarily for commercial vehicle parking only. The private vehicles are

parked all along the main arterial road. This on street un-regularized parking creates congestion in

the town and hampers the traffic movement.

6.8 Pedestrian Pathways

There are no designated pathways for the pedestrian movement in the town. The 1.5m shoulders at

both ends are used as pedestrian’s walkways. Most of the time these shoulders are encroached and

used as the parking space. In absence of the designated walkways in the town and planning area,

pedestrians use carriage ways for the movements which often leads to accidents.

8415

jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939

Pedestrian pathways are required in the town and the planning area because most of the trips are

made through walking. From the primary survey, it has been seen that 87% of respondents make

one trip (internally mostly) per day in the planning area. More than 65% of the sample household

trips are made through walking. This is the reason that pedestrian pathways are very much required

infrastructure in the planning area.

6.9

Issues and Concerns

The issues related to Traffic and Transportation are as follows:

a.

Some of the stretches of the metalled roads are very bad in condition which is not motor

able and produces lots of dust that reduces the visibility.

b. No designated parking area is available within the town that leads to random parking along

the road which creates congestion inside the town.

c.

No designated pathways are available within the town for pedestrian movement. Pedestrians

use carriage ways for the movement inside the town which leads to the fatal and non-fatal

accidents.

d. The level of service is C for the Kangra connecting road which needs to be modified.

e.

More than 50% of the traffic entering the planning area is through traffic and creates a lot of

congestion inside the town.

f.

No street furniture is available inside the urban area. Due to the unavailability of the street

furniture like signage, traffic lights, zebra crossings, marked carriage ways, illuminating

dividers, street lights the traffic movement gets slowed down and creates congestion.

6.10 Proposals and Recommendations

1.

Considering 5% growth rate as per planning commission projection of traffic (Annexure 3).

The estimated traffic on NH-303 near PWD rest house towards Kangra is approximate

10000pcus which has been divided in approximate half in two directions at the Bus stand

junction one towards Hoshiarpur and one towards Hamirpur.

2.

Traffic on NH-303 near PWD rest house towards Kangra shows that it will cross the

capacity of 2-lane paved shoulder in year 2017. So 4 lane paved shoulder is recommended.

3.

The same traffic will enter in town area and due to highly congested area. A bypass for one

direction traffic (Kangra to Hamirpur).has been suggested as expansion of road in town area

is not possible.

6.11 Proposed Road Network

To improve the regional connectivity as well as accessibility to various planning zones within

Nadaun Planning Area, augmentation of the road network across various planning zones is

proposed with connections to the regional linkages. A system of bypass roads has been suggested

which will provide bypass alignments to regional traffic movement without entering the congested

core areas of the planning area. A by-passes have been proposed i.e. Beas Bridge-right bank of

Beas (outside the planning area) - Nadaun Fort –Tillu Khas-MDR-36 at Jalari Saunkhlan.

Proposed urban road network showing the major Urban Arterials and Secondary Arterials along

with connections from Regional Arterials is shown in the Proposed Land use Map (Map No.

1432/IPD/NPA/P/01) Only higher order arterial roads have been outlined in the new areas while

lower order roads can be suitably developed while preparation of detailed plan.

8416

jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939

6.12 Improvement and Upgradation of the Existing Road Network

It has been found that intersections in Nadaun reach their saturation capacity much earlier than the

links. Also, as intersections are closely spaced within the core area, they contribute more to the

network congestion compared to links. However, both intersection and links require upgradation to

increase the capacity to cope with the existing traffic demand. A general set of recommendations is

listed which can be suitably adopted to upgrade the intersections.

Selected measures for improvement of intersection capacity are listed as follows:

Possible widening and correction of horizontal and vertical alignment.

Installation of traffic signals with appropriate signage at strategic points.

Removal of visual obstruction to increase sight distance and facilitate turning

maneuvers.

Installation of pedestrian crossing preferably grade separated to segregate pedestrian

and vehicular movement at intersections. For at grade pedestrian crossings, the

movement should be synchronized with the signal phases.

The remote and interior parts of the planning area will be on priority for augmentation

of transportation network.

Selected measures for improvement of link capacity are listed following-

Widening of the carriageway, wherever possible.

Creation of pedestrian facilities on both sides to segregate pedestrian and vehicular

traffic flow.

Appropriate railing and fencing arrangement along pedestrian walkways.

Illumination of the road links to facilitate night time movement.

Improvement of the road side drainage channels, not only to create additional road

space but to protect the pavement from deterioration.

Road surface stabilization and appropriate arrangement for cross-road drainage (water

streams and falls).

Restriction of on-street parking along congested links, especially during peak hours.

Installation of traffic signages and signals for pedestrian crossing preferably

synchronized with intersection signals. Some busy links might require grade separated

pedestrian crossings.

6.13 Pedestrian Facilities

The roads in Nadaun have no footpaths for pedestrian movement, which forces the people– forcing

them to move along the carriageway and are prone to accidents.

As walking is the only effective Non-Motorized Transit (NMT) mode, management of pedestrian

facilities can boost significantly the patronage for NMT movement within Nadaun Planning Area

(i)

Walkways at least 1.5m to 1.8m and cycle track of at least 1.5m to 2.0m on both sides of the

carriageway to segregate pedestrian traffic from vehicular carriageway.

(ii)

Complete restriction of on-street parking on pedestrian pathways – even if they are lying

empty.

6.14 Parking Management

Creation of off-street parking facilities at strategic locations, preferably multi-storied is required to

relieve the parking load from the vehicular carriageway and to meet the parking demand.

8417

jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939

There is a need to restrict (completely or partially) on-street parking activity to increase the

capacity of the roads and improve traffic flow.

A parking management plan must be prepared for the entire planning area.

The plan proposes the following:

a)

Parking lots have been proposed on vacant government, land (if available) near

concentrated parking generation zones like market area.

b)

Parking space provision has been incorporated in building bye laws considering its

adequacy in the context of growing vehicle ownership.

Apart from parking of cars, significant numbers of taxi, jeep, LCV and trucks are found to be

parked along some of the links. Idle bus parking should be restricted to dedicated bus stands. Taxi

parking should be encouraged only at certain location where its parking will not interfere much

with the vehicular flow.

7

Heritage and Tourism

7.1

Heritage

Nadaun is a host to a lot of Natural as well as Man-Made Heritage. Nadaun being located on the

bank of Beas River makes a picturesque profile which even attracts the tourists is the most

important Natural Heritage of the town. In terms of Man-Made Heritages, the town is full of such

heritages but now they are in dilapidated condition due to ignorance and non-maintenance.

7.1.1 Natural Heritage

7.1.1.1The Beas River:

Nadaun is placed on the banks of Beas River. A favorite pastime of people of Nadaun is evening

walk to the Nadaun Bridge. There are many restaurants which have come up in this area. This

Bridge provides fantastic views of Beas River and of sunset. This bridge separates Hamirpur

district from Kangra district. Another interesting pastime is river-cruise in a small wooden boat.

One can enjoy this ride the whole day. The boat is still used as a mode of transport.

There is a proposal by the State Tourism Department that on a 16 km stretch from Dhera Bridge to

Nadaun Town would be used for promoting water sports viz, river rafting. It would attract the

tourists in huge number. The river front can be developed nicely for the recreational purposes of

citizens of Nadaun and tourists also.

7.1.2 Man-made Heritage

As Nadaun has a rich history dating back to the 17th century, it has quite a number of heritage

buildings, monuments and structures.

8418

jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939

Figure 0-1: Places of Tourist Attractions, Nadaun

Source: Field Survey

7.1.2.1 Nadaun Fort

Nadaun fort is better known as Amtar-Nadaun fort/ Sansar Chand fort, which was once the royal

residence of Raja Sansar Chand. This Fort attracts visitors by its impeccably done wall paintings

and frescoes. Unfortunately, the fort is in a dilapidated condition but it still manages to put visitors

in awe with its exquisite architecture. It is an ideal place that reflects the rich history of Raja Sansar

Chand and the Katoch dynasty. The fort is in a dilapidated state but still representative of family of

Maharaja Sansar Chand Katoch reside there. The Govt. should acquire, protect and conserve the

premises.

Figure 0-2: Nadaun Fort

Source: Field Survey

Nadaun

8419

jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939

Figure 0-3: Nadaun Fort

Source: Field Survey

7.1.2.2Gurudwara Shri Patshahi Dasvin

It is located in Nadaun town on the banks of Beas River where Guru Gobind Singh camped for nine

days during the battle of Nadaun, between Raja Bhim Chand and Mughal General Alif Khan. Guru

Saheb assisted Raja Bhim Chand and won the battle against Mughal General. The spot later on

converted in a Gurudwara by the order of Maharaja Ranjit Singh. However, the present building

was constructed by Rai Bahadur Baisakha Singh in 1929.

Figure 0-4: Historical Gurudwara, Nadaun

Source: Field Survey

7.1.2.3 Samadhi of Dhyanu Bhagat

Dhyanu Bhagat a true devotee of Maa Jwalaji, offered his own head to the Goddess to prove the

power of Maa Jwalaji to the then Mughal Emperor, King Akbar. The Samadhi to the great devotee

is in Nadaun and an important heritage and pilgrimage site.

8420

jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939

Figure 0-5: Samadhi of Dhyanu Bhagat

Source: Field Survey

7.1.2.4Baoli or Step Wells

There are a number of baolis or step wells in Nadaun which were the major sources of water to the

town. One of the famous step-well is a 105 stepped baoli located along the NH-3 in Gagaal village.

The step-well is now in a very dilapidated state and has been filled with mud. Refer Figure 0-6.

7.1.2.5 Paudiyan or Steps Ghats

There are a number of paudiyan or stepped ghats along the Beas River in the Nadaun town. Few of

the most famous ones are the following:

1. Pattan di paudiyan - located near the SMD office

2. Matta wali paudiyan

3. Kaaji Pattan paudiyan - near Samadhi of Dhyanu Bhagat

These paudiyan are in a dilapidated state and needs to be conserved and preserved due to its

heritage value.

Figure 0-6: Baoli at Gagaal

Source: Field Survey

8421

jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939

Figure 0-7: Pattan Bazaar di paudiyan

Source: Field Survey

7.1.2.6 Lavneshwar Mahadev Temple

This is a famous Lord Shiva temple. It is believed that construction of Lavneshwar Temple was

initiated by the Pandava's. A popular belief about the Shivalinga in the temple is that it grows every

year by a height equal to one grain of rice.

7.1.2.7Shiv temple

Shiva Temple is the oldest temple in Pattan Bazar. People offer regular prayers and worship the

lord Shiva. The temple has become very famous among people over a period of time.

Figure 0-8: Shiv Temple in Nadaun

Source: Site Visit

7.1.2.8Peer Sai Fazal Shah Saheb Grave

There is a mausoleum or shrine of a Sufi Saint Sai Fazal Shah located in Bharmoti Kalan village

which is of religious importance and a prominent tourist destination. According to folklore, Sai

Fazal Shah, a renowned saint in the region, became popular amongst the people. The grave was

built by Sansar Chand, a king of the Katoch Dynasty, who was also amazed by the saint’s power.

8422

jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939

Figure 0-9: Peer Saheb Grave

Source: Field Survey

As per the Hindu calendar, in the last month of Magh or the 2nd week of February, a grant feast

(bhandara) is organised in his honour. During this time, along with wrestling competition.

7.1.2.9 Inderpal Chowk

Nadaun was the home town of a great freedom fighter Shri Inder Pal. To commensurate his

contribution in the freedom struggle, a statue of Shri Inder Pal has been installed at the junction of

the New Bus stand. Also, the junction has been named after him, Inderpal Chowk.

7.2 Tourism

Nadaun is located very near to the Dhauladhar Regional Tourist circuit.

7.2.1 Regional Level

There are many famous and important tourist sites in the vicinity of Nadaun the planning area as

well. They include Sujanpur Tira, Deotsidh Temple, Jwalaji Temple, Mahakaleshwar Temple, Dera

Baba Vadbhag Singh Gurudwara and others.

7.2.2 Planning Area Level

There are many of tourist sites located in and around Nadaun Planning Area (within 30km). Apart

from the heritage structures mentioned above, the following are a few important tourist sites in

Nadaun.

7.2.2.1 Atal Bihari Vajpayee Cricket Stadium

The Atal Bihari Vajpayee Cricket Stadium is one of the famous cricket stadiums in Himachal

Pradesh which is located at the north-east edge of the Planning Area. It is one the important

landmark of the Planning Area. Mostly State level cricket matches are organised in this stadium.

With the establishment of Atal Bihari Vajpayee Cricket Stadium, a lot of students, cricketers,

sportsmen and visitors come to Nadaun to play, watch the cricket match or for training purposes.

This has resulted in a boost of sports tourism and other support activities in the town.

8423

jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939

Figure 0-10: Atal Bihari Vajpayee Cricket Stadium

Source: Field Survey

7.2.2.2 Jwalaji Temple

There are nine different flames within the temple. It is said that centuries ago, a person saw the

flames for the first time and Raja Bhoomi Chandra, the ruler of the area had the original temple

built. The Mughal Emperor Akbar installed a gold parasol and Maharaja Ranjit Singh had the dome

gilded. Across the courtyard is Devi's bed chamber and above the temple is the shrine of Baba

Gorakhnath. This is just 11 km from Nadaun town.

7.2.2.3 Chaumukha

Chaumukha is a famous temple of lord Shiva with a huge four faced image. The temple is located

11 km away from Nadaun town.

These are the places of interest in and around Nadaun town. The main issue is that these places do

not attract tourists in the same quantum as other places of Himachal Pradesh do. Jwalaji receives

the maximum number of tourists as it is one of the shaktipeeths and attracts thousands of pilgrims

every year while the other places of attraction only receive the local tourists.

7.3 Tourism Infrastructure

There are no star category or luxury hotels in Nadaun. Presently, there are only three standard

hotels in Nadaun with 30, 24 and 24, total 78 beds. Apart from this, there is also one PWD rest

house located in the town. There are good number of restaurants and eating joints in and around the

town also. As a small town with limited tourist arrivals, the number of hotels and restaurants are

quite sufficient.

7.4 Tourist Forecast

Himachal Pradesh Tourism Development Corporation (HPTDC) should include Nadaun in the

Dhauladhar Circuit. The circuit shall cover the entire Nadaun area along with nearby tourist

destinations.

It is envisaged that Nadaun will be included in Dhauladhar circuit soon. Simultaneously,

conservation and restoration of Nadaun fort is expected to be taken up on priority for

implementation. Promotion of ABV stadium for sports at national level, will leverage further

tourist activity at Nadaun.

8424

jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939

7.4.1 Tourists Accommodation

Presently there are 78 beds in 3 hotels which caters the inflow of visitors who are coming for the

ABV Cricket Stadium. Considering their will be a change in tourist inflow of about 300%,

additional Hotels and hotel beds needs to be developed during the Plan period. The Table 0-1

shows the number of Hotels and Beds by the horizon year.

Table 0-1: Projected Distribution of Hotels and Beds

Type

Luxury

Star Category

Economy/ Budget

Hotel

2

3

5

No.

of Beds

46

70

118

Source: Projected based on past trend

7.4.2 Tourism Strategies

The Recommendations for tourism development in the Planning area which has been incorporated

in the Development Plan are as follows: —

Preparation of Tourism Master Plan for the Planning area well integrated with existing

tourist circuits in HP state by the Competent Authority.

Development of other tourist circuits by the tourism department in co-ordination with the

private sector.

Development of Tourist Infrastructure in the Planning area.

Promotion of Sustainable Tourism in the Planning area.

The proposed tourist circuits are as follows:

Intra-Town (within)

Inter-Town (between)

Intra-Town

(i)

Nadaun Fort

(ii)

ABV Cricket Stadium

(iii)

Gurudwara Shri Patshahi Dasvin

(iv)

Recreational spaces and Ghats on the bank of River Beas.

(v)

River Rafting on Beas River

(vi)

Peer Sai Fazal Shah Saheb Grave

(vii)

Nadaun Bridge

Inter-Town

1 Dada Siba Temple

2 Chaumukha Temple

3 Jwalaji Temple

4 Baijnath Temple

5 Bir Monastery

6 Murli Manohar Mandir

7 Narvadeshwar Temple

8 Tea Gardens and Factory

9 Saurabh Van Vihar

8425

jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939

10 Ambika Devi Temple

11 Sujanpur Tira

12 Deotsidh Temple

13 Kalanjari Devi

14 Jhanyari Devi Temple

15 Shahtalai

16 Bil-kaleshwar Temple

17 Chintpurni Temple

An “Inter and intra” city Tourist Bus service will be proposed which will provide the

bus service once/twice a week and later will increase the service according to the

tourist demand/response.

To increase the tourist footfall, a yearly or a half yearly local Nadaun fair is proposed

to attract tourist to explore and enjoy the Nadaun culture and history. The fair may

have the local flavour of Nadaun history, their art, culture, tradition, dance, music, etc.

Art and Craft Village (Nadaun Haat) is proposed to be developed near the Fort area to

promote employment opportunity for the people.

River front development on the bank of river Beas is proposed to attract tourism both

for the local and outside tourist, (as in the case of Rishikesh and other cities in India)

Nature walk along the river front

Water sport centre, having various adventure activities like River Rafting, Camping,

Kayaking, Bungee jumping, Mountain Biking, etc., should be proposed so as to

promote tourism sports in these area.

Nadaun fort to be developed as a picnic spot for the people of Nadaun as well as some

part of it will be converted into Museum.

Some other areas of attraction are: -

View point on the hill top

Eco-tourism in DPF Tillu and DPF Kuthar

7.4.3 Infrastructure

The key strategies for boosting tourism sector in the Planning area have been summarized below-

1.

Development of good quality transport and social infrastructure

2.

Development of tourist amenities and services as per international standards.

Development and maintenance of the tourist destinations

3.

Allocation of funds for tourism development

4.

Rehabilitation and sustainable development of tourism sites

5.

Events and festivals leveraging cultural heritage in terms of religion, art and crafts and

languages. Developing the handicraft and handloom haats

6.

Encourage participation from government sectors, civil societies and local

administration

7.

Policy and regulatory support

8.

Tourism awareness programs and workshops may be organized to enhance

sensitization towards tourists and tourism destinations and for sustainable development

and maintenance of tourism sites in the planning area

9.

Basic amenities like clean public toilets, easily accessible telecommunication services,

tourist information centres, banks and currency exchange centres, food courts and

restaurants, hotels and lodges etc. among other services to be provided

10. Quality Hotels, recreation and shopping centres, local transportation, taxi services etc.

8426

jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939

7.4.4 Sustainable Tourism

According to World Tourism Organization, Sustainable Tourism refers to Environmental,

Economic and Socio-Cultural aspects of tourism development.

Eco-tourism is a form of sustainable tourism – all forms of tourism can become more sustainable

but not all forms of tourism can be eco-tourism.

The principles of Sustainable Tourism are: -

Tourism should be blended with local environment and community.

Tourist experiences focuses on existing features.

Local ownership.

Local materials and food.

Conservation of resources.

Figure 0-11: Principles of Sustainable Tourism

Source: www.sustainabletourismonline.com

8

Facilities and Services

8.1

Introduction

The existing social infrastructural facilities has been compared with the URDPFI 2015 Guidelines

to identify the gaps and accordingly propose additional facilities in the Planning area. The existing

infrastructure gap and the future requirements has been estimated, based on the projected

population for 2035.

8.2

Educational Facilities

8.2.1 Pre-Primary Education

There are two government and three private pre-primary schools at rural areas of the planning area.

The schools are located in Harmandir Mandiala, Jalari Saunkhlan, Kuthar, Tillu Pratham and Bela

villages.

8.2.2 Primary Education

There are three government and one private primary schools in the Nagar Panchayat of Nadaun. In

rural areas, there are five government primary schools situated at Harmandir Mandiala, Jalari

Saunkhlan, Tillu Khas, Bela and DPF Tillu. There is one private primary school in Bela.

8427

jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939

8.2.3 Middle School Education

There is one exclusive middle school in Harmandir Mandiala village. Other villages and urban

areas have the senior secondary schools which serve as the middle school as well to the entire area.

8.2.4 Secondary School Education

There are three government and one private Higher Secondary schools in Nagar Panchayat area

which serve as the secondary school in the area. In case of rural areas, two high schools serve as the

secondary schools.

8.2.5 Higher Education

There is a Government Degree College just outside the Planning Area named Sidharth Government

College. It offers course in Arts, Science, Commerce, Business Management and Computer

Applications.

A part from this, there is one general private college in Nadaun Town named Vijay Vallabh

College of Education which provides the Bachelor course in Arts, Science and Commerce subjects.

There is one institute on Pharmaceutical research in the Nadaun Town named Himachal Institute of

Pharmaceutical Research. The institute provides bachelors in pharmaceutical sciences.

Figure 0-1:Himachal Institute of Pharmaceutical

Research Institute, Nadaun

Source: Site Visit

8.2.6 Vocational Education

There is one ITI located at the Sujanpur road named Maa Jwala ITI. It serves a radius of 10-15km

area. It provides courses for electrician and electronic mechanic. There is also a private polytechnic

in Nadaun located in the campus of Vijay Vallabh College of Education.

Figure 8-2: Vijay Vallabh Pvt. ITI, Nadaun

Source: Site Visit

8428

jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939

8.2.7 Proposal

The Planning area has sufficient education facilities to cater the present need of the town. The

additional requirement for future population are based on the URDPFI 2015 guidelines.

There is requirement for three Pre-Primary School and one Primary School in the Nagar Panchayat

area as there are none presently. The higher educational facilities like Colleges and Professional

Colleges are already well distributed in project area and adequate for the future population

envisaged.

Table 8-1: Future demand for Educational Institutes

Name of Facilities

Existing No. of

Facilities

Required No. of

Facilities

Area

(in Ha

Pre-Primary School

5

2

0.2

Primary School

6

1

0.3

Senior Secondary School

5

-

0.0

College

1

-

0.0

Professional colleges

2

-

0.0

TOTAL

0.5

Source: Analysis and Estimation based on URDPFI Guidelines

8.3 Medical Facilities

There are three dispensaries in Nadaun Nagar Panchayat Area one each at Gagaal and Bela

villages. As Nadaun is the Block and Tehsil head quarter of Nadaun Block and Nadaun Tehsil, it

houses the Block Hospital in the town. There is one veterinary hospital in the planning area which

serves the entire Nadaun Tehsil.

With the increase in population and growth of town, there is a great need to make available

sufficient healthcare facilities to the inhabitants of the Planning area. The additional requirement

for health facilities has been based on the URDPFI Guidelines.

The existing and proposed health facilities has been listed below.

Figure 8-3: Sub-Divisional Veterinary

Hospital

Source: Site Visit

8429

jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939

Table 8-2: Future demand for Healthcare Facilities

Name of Facilities

Existing No. of

Facilities

Required No. of

Facilities

Area (in Ha)

Dispensary

5

2

0.040

Family Welfare Centre

0

3

0.150

Nursing Home

0

1

0.075

Hospital

1

-

0.000

Veterinary Hospital

1

-

0.000

TOTAL

0.265

Source: Analysis and Estimation based on URDPFI Guidelines

One additional dispensary in Bela and Bharmoti Kalan and one nursing home is required in the

entire planning area. Presently there are no Family Welfare Centers available in the Planning area

and there is requirement of at least three centres. Considering the projected population and the

regional Health Facilities, upgradation of existing Block Hospital is proposed. Presently, the

hospital is 30 bedded which is proposed to be upgraded to 100 bedded Hospital.

8.4 Public Facilities

8.4.1 Postal Services

Nadaun Nagar Panchayat has a Sub-Divisional Post office. All the post offices and sub-post offices

of Nadaun Tehsil come under it. Apart from these, post offices are also located at Jalari, DPF Tillu

and Bela villages. The sub post offices are located at Bela and Tillu Pratham Villages.

Table 8-3 Future demand for postal services

Name of Facilities

Existing No. of

Facilities

Required No. of

Facilities

Area

(in Ha

Rural Post Office

3

-

0.00

Sub Post Office

2

4

0.20

Post Office

1

1

0.15

TOTAL

0.35

Source: Analysis and Estimation based on URDPFI Guidelines

There is a requirement of two Sub Post office in Bharmoti Kalan and Harmandir Mandiala. Post

office at administrative office already exists in Nadaun town however, one more is proposed in

Tillu Khas.

8.4.2 Telecommunication Services

The villages in the Panning area and the Nadaun Town is connected by the land line telephone

network. The broad band connectivity is also there in the town and some of the villages have the

internet connection as well but network connectivity is poor in rural areas. There is one telephone

exchange in the Nadaun Nagar Panchayat which is enough to serve the projected population and

Planning Area.

8.5. Police Services

There is one police station in Tillu Khas and two police booths in the Planning area. One booth is at

the bus station and another one is near Jalari.

8430

jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939

One additional police stations and 3-number of Police posts are required, which shall be distributed

Nagar Panchayat Area, Bharmoti Kalan and Bela.

Table 8-4 Future requirement for security facilities

Name of Facilities

Existing No. of

Facilities

Required No. of

Facilities

Area

(in Ha)

Police Post

2

3

0.30

Police Station

1

1

0.50

TOTAL

0.80

Source: Analysis and Estimation based on URDPFI Guidelines

8.5.1 Safety

8.5.2 Fire Services

There are no fire-fighting stations inside the planning area. The nearest fire-fighting station is

located at Hamirpur town which is 28km from Nadaun. As per URDPFI Guidelines, one fire station

is required to cater to 50,000 population.

If fire breaks out in the planning area there is no facility to tackle the situation immediately. The

necessary help would take at least one hour to reach at the destination.

Thus, a Fire station is required in the Planning Area. Fire Station is proposed along the NH-3 in

Nagarada village.

8.5.3 Disaster Management Centre

Disaster management cell should work under the Sub-Divisional Magistrate officer. Currently, no

such Disaster management cell is operational in Nadaun Sub-division. The area falls under earth

quake risk zone which depicts disaster can hit the area any time.

As per URDPFI Guidelines, one Disaster Management Centre is required to cater to 20,000

population within 5-10 km radius. Since, the Planning area is prone to natural hazards therefore one

Disaster Management Centre has been proposed in Bharmoti Kalan with suitable open area for

parking, temporary shelter etc.

8.6 Socio-Culture Facilities

In terms of socio-cultural facilities, only one banquet hall is existing in the Planning area. The

availability of community facilities in the Planning area is not adequate. There is requirement of

Banquet Hall and Community Welfare Centre.

8431

jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939

Banquet hall and Community Welfare Center is proposed in Nagar Panchayat Area to cater to the

need of projected population.

Figure 8-4: Community Hall

Source: Site Visit

Table 8-5 Future demand for other community facilities

Name of Facilities

Existing No. of

Facilities

Required No. of

Facilities

Area (Ha)

Banquet Hall

1

1

0.10

Community Welfare Center

0

1

0.15

Source: Analysis and Estimation based on URDPFI Guidelines

8.7 Support Facilities

8.7.1 Service Facilities

Distributive Facilities include Food grain Distribution Centre, Milk Booth, LPG Godown, Fuel

Station and Petrol Pumps. Presently there are three Petrol Pumps in the planning area.

In terms of distribution services, the Planning area requires a LPG Godown /Gas Godown and two

Milk booths to meet the demand of 2035 population. These need to be provided for while

preparation of Sectoral Plans.

8.7.2 Cremation/ Burial Ground

As per URDPFI Guidelines, one Cremation Ground is required to cater to 10,000 populations

within 5-10 km radius. The cremation grounds presently functioning in Kot is proposed to be

retained. The cremation ground situated shall continue to function. One more Cremation shed is

proposed, at the same location.

8.8 Sports and Recreation

The Planning area lacks in organised green spaces. The present land allocation for the recreational

facilities is very low in comparison to the growth of the Planning area. Existing open spaces are

generally scattered and are not interconnected.

8.8.1 Recreational Spaces

There are no designated neighbourhood parks in Nadaun and its surroundings. There is a need to

provide for existing as well as for proposed population.

There is only one public park in the entire planning area near Shiv Temple. There is a great need to

provide more gardens, parks, and playgrounds in the area for citizens.

8432

jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939

Figure 8-5:Existing Park in Nadaun Planning

Area

Source: Site Visit

Table 8-6 Future demand for recreational facilities

Name of Facilities

Existing No. of

Facilities

Required No. of

Facilities

Area (Ha)

Housing Area Park

1

3

3.00

Neighbourhood Park

0

2

4.00

City

Parks/

playgrounds/maidan/

exhibition grounds/ cultural gathering

grounds

2

-

0.00

Botanical Garden

0

1

10.0

Recreational complex including zoo

0

1

10.0

Total

27.00

Source: Analysis and Estimation based on URDPFI Guidelines

8.8.2 Neighborhood Level Recreational Spaces

There is one playground near the bus stand known as Kharidi Ground and one maidan next to SDO

office in ward no. 2 where various cultural events like Ramlila and sometimes political/ election

rallies are held. Other than this there are no town level open spaces available in Nadaun Planning

Area. There is a need of the same.

Figure 8-6: Ramlila Maidan

Source: Site Visit

8433

jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939

Additional three Housing Area Parks are required, one in sector. Two neighbourhood parks are

proposed in Nagar one in Panchayat Area and the other one in Bharmoti Kalan village respectively.

Also, Botanical Garden and Recreational Complex Including Zoo is proposed in Tillu Khas

8.8.3 Sports Facilities

There is one cricket stadium in Nadaun where many of the national and state level matches are

held. This is an important landmark of Nadaun town.

Figure 8-7: Atal Bihari Vajpayee Stadium in Bela

Source: Site Visit

As per the URDPFI guidelines four residential play area are required to serve the envisaged

population. The play area will be distributed in each sector. Also, a neighborhood play area is

proposed in Nagarada village in Nadaun NP.

Table 8-7 Future demand for sports facilities

Name of Facilities

Existing No. of

Facilities

Required No. of

Facilities

Area (Ha)

Residential unit play area

0

4

2.0

Neighbourhood Play area

0

1

1.0

Source: Analysis and Estimation based on URDPFI Guidelines

8.9 Green Belt

Nadaun town has large eco-sensitive areas like natural drains and river which needs to be

preserved. The proposal provides for green buffer as Green Belt along the water bodies. A buffer of

25 m along Beas River is proposed and also, development of 2 m green buffer around the natural

drains is proposed to conserve the natural drainage in the planning area.

9

Basic Infrastructure

9.1 Water Supply

9.1.1 Existing Situation

Nadaun Planning Area utilizes both surface water and groundwater to cater to its domestic as well

as agricultural demand for water supply use. Surface water is the major source of water supply for

8434

jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939

the planning area. Water is being supplied to Nadaun Planning Area from Beas River through a Lift

well Water Supply Scheme (LWSS) by the Irrigation and Public Health (IPH) Department. Apart

from the water supply by IPH, water supply need is also met through individual/ community bore

well and hand pumps.

9.1.1.1 Existing Water Supply Schemes

There are three water supply schemes operational in Nadaun Planning Area. All the three schemes

are Lift Water Supply Schemes. One water supply scheme supplies water to the Nagar Panchayat

area while the other two supply water to the Gram Panchayat area.

Under the LWSS Nadaun Scheme (1989-90), a Water Treatment Plant of capacity 0.78 MLD had

been constructed at Kunah Khad but due to multifarious construction activities in the vicinity of the

intake well, the turbidity of river Beas has reached 10,000 ppm during summer and monsoon

season and is beyond treatment parameter. Thus, a new Lift Water Supply Scheme has been

proposed by IPH Department at Village Kaloor by tapping the underground water through tube

wells.

9.1.2 Demand Estimation

CPHEEO Manual norms for Water Supply have been adopted for calculating water demand for

base year, intermediate year and target year.

It is proposed that rate of water supply should be increased to 135 lpcd for residential purposes and

for other purposes, consumption rate as mentioned in CPHEEO Manual.

As per URDPFI guidelines, the water required for firefighting purpose demand on total residential

water demand is 1 – 2 % of total water demand. The transmission and distribution losses are

assumed to be 15 % of the total water demand.

Based on this framework the estimated water demand for various activities in the Planning area is

given below

Table 9-1: Water Demand and Gap

Description

Year

2016

2026

2035

Proposed Population

11106

13941

17501

for Domestic @135 lpcd (MLD)

1.50

1.88

2.36

Commercial Demand (MLD)

0.11

0.13

0.17

Industrial Demand (MLD)

0.09

0.11

0.14

Institutional Demand (MLD)

0.04

0.05

0.06

Floating Demand (MLD)

0.12

0.15

0.19

2% Fire Fighting (MLD)

0.04

0.05

0.06

Total Water Demand (MLD)

1.89

2.37

2.98

15% losses (NRW) (MLD)

0.28

0.36

0.45

Grand Total of Water Demand (MLD)

2.17

2.73

3.42

Existing Supply (MLD)

0.78

0.78

0.78

Gap (MLD)

1.39

1.95

2.64

Source: Estimated based on CPHEEO Manual for Water Supply

The total water demand for base year 2016, intermediate year 2026 and target year 2035 is 2.17

MLD, 2.73 MLD and 3.42 MLD respectively. At present, water is supply does not take into

8435

jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939

account the floating population and firefighting load. Hence to bridge the supply gap, water supply

system need to be augmented to meet the water demand at different stages.

9.1.3 Water Sources and Treatment:

The existing water sources can be used to meet the water demand for the Planning area. Presently,

the existing water treatment plant is required to be augmented as per demand estimation.

Table 9-2: Water Treatment Demand

Description

Year

2016

2026

2035

Total Water Demand (MLD)

2.17

2.73

3.42

WTP Capacity Required (MLD)

2.49

3.12

3.92

Existing WTP Capacity (MLD)

0.78

0.78

0.78

Augmentation required (MLD)

1.71

2.34

3.14

Source: Estimated based on CPHEEO Manual for Water Supply

9.1.4 Service Level Benchmarking

Service level benchmarking have been formulated by the Ministry of Urban Development (MoUD)

with a view to achieving all-round sustainability including environmental sustainability.

9.1.5 Key Issues & challenges

The existing water supply system for the study area is not sufficient to cater even the

existing water demand of the area

Intermittent water supply system

Water losses

Consumers lack awareness for consumption of water

9.1.6 Development Strategies

The present water supply system in project area is intermittent, this is proposed to be developed

into 24x7 water supply system. Decentralization in the distribution system ensures equalization of

supply of water throughout the area. Each decentralized area should have its separate distribution

network served by the elevated and/or ground level service reservoirs. The service reservoirs

should be provided at the highest elevation of the distribution zone, so that the water can be

distributed by gravity for majority of the supply area.

Table 9-3: Service Level Benchmarking for Water Supply System (2016-2035)

Sl.

No.

Services

Ultimate Benchmark

as per MoUD, GoI

Guidelines

Present

Status (%)

Aim to be

achieved in

Long Term

1

Coverage of Water Supply

connections

100%

90%

100%

2

Per Capita Supply of Water

in Project area

135 lpcd

70 lpcd

135 lpcd

3

Extent of Non-revenue Water

15%

NA

15%

4

Extent of Metering

100%

NA

100%

5

Continuity of Water supplied

24 Hours

NA

24 Hours

6

Efficiency in redressal of

customer complaints

80%

NA

80%

7

Quality of Water Supplied

100%

NA

100%

8

Cost Recovery

100%

NA

100%

9

Efficiency in collection of

Water charges

90%

NA

90%

Source: Based on NMSH, MoUD, GoI, 2014

8436

jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939

Present capacity of storage reservoir at entire Planning area is 1.87ML. The required storage

capacity of service reservoirs 0.95 ML per day for the vision year based on 24x7 water supply

system. So, existing service reservoirs can be used to supply water to end users, depending upon

the physical condition.

9.1.7 Fire stations and other fire-fighting facilities

Generally, firefighting network are designed for minimum 50 psi at each node in the system. This

type of network would need to be designed independently or the combined water supply network

for town.

The population size and given extent, it is not economically viable to design a firefighting network

independently or combined, that is fully capable of meeting firefighting requirements.

As a result, it is recommended that the fire-fighting services will be catered through a fire station.

Presently, there is no fire stations inside the planning area. The nearest fire station is located at

Hamirpur town which is 28km far from Nadaun. According to the standards set by URDPFI, one

fire sub-station has to be located within 3-4 km radius with essential residential accommodation

which would serve at least 50,000 people. Thus, a new fire station is proposed along NH-3 in

Nagarada village.

The fire station will have dedicated water reservoir with adequate capacity within its premises

which will be supplied from nearest service reservoir. Fire hydrants on the periphery exclusively

for fire-fighting services should be considered in residential/ commercial/ industrial zones.

Necessary provisions for laying underground/ over ground fire-fighting measures, water lines,

hydrants etc. may be kept. The concerned agencies shall take approval from Fire Department for

fire-fighting measures while laying the services for an area.

As per information received from IPH, Nadaun, one UGR of capacity 10,000 ltr. is proposed for

dedicatedly fire-fighting purpose.

9.1.8 Water Tariff

There is differential water pricing in Nadaun Planning Area. Water tariff for domestic connection

in Nadaun urban area is Rs. 107/- per month while the same in rural areas is Rs. 28/- per month.

From April’2016 onwards, the water tariff in urban area has been revised. Domestic tariff is Rs.

11.40/KL and Commercial connection also follows the differential pricing system with Rs. 22.40

per 1000 litres in urban areas and Rs. 50/- per month in rural area of planning area.

9.1.9 Proposal and Recommendations

1.

Development strategies for improvement and utilization of existing water supply schemes

for the potential demands and adequate supply of potable water in the region.

2.

Detailed analysis of existing water sources and supply system

3.

Detailed designing of water supply system (DPR)

4.

Water supply shall be on 24x7 for equity, effective metering and for best hygiene model of

supply. Leakage detection and thefts can easily be revealed only with a 24x7 supply pattern.

5.

Augmentation of Water Treatment Plant or setup new water treatment plant of 2.40 MLD

by 2026 and additional 1.00 MLD capacity of water treatment plant after 2026 at Bella

villages

6.

100% coverage of treated piped water supply to all users

7.

Replacement or Repair the old/defunct system/network, if any

8.

Streamlining of household connections as well as legalized connections

8437

jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939

9.

Implementation of 100% Consumer metering system

10.

Awareness program for optimization of water use, recycling and recharging

11.

Introducing SCADA system to minimise water losses and theft

12.

Setting up a new Fire Station inside the planning area

13.

Complaint redressal centers to be set up to look after the issues on water supply

14.

Systems should function with minimum interruption and failures.

15.

Use of Recycled water for meeting horticulture, air-conditioning, industrial cooling and

other non-potable uses

16.

Implementation of Rain Water Harvesting Scheme.

17.

Detailed Operation and Maintenance Programme.

9.2 Sewerage System

9.2.1 Existing Situation and Demand Estimation

At present, Nadaun Planning Area does not have any sewage network. The planning area being

situated in a plain to hilly terrain utilise individual septic tanks for sewage disposal.

Taking 80% of total water supply and 10% infiltration as per CPHEEO Manual on Sewage and

Sewage Treatment, Clause 3.6, future sewage generation projected is as follows:

9.2.2 Proposal for Development

An efficient sewerage and wastewater disposal system is of critical importance with respect to

maintaining high standards of health and hygiene in the Planning area. The sewerage system

proposed for planning area aims at the provision of such a facility in a cost effective and organized

manner, by establishing a hierarchical distribution of sewer networks in the urban landscape. The

aim here is to regulate the diameter of the sewerage pipes, which is the costliest entity of the

system, by establishing a distinct hierarchy in the collection system catering to its optimal needs.

Taking 80% of total water supply and 10% infiltration as per CPHEEO Manual, future sewage

generation projected is as follows:

Table 9-4: Sewerage Generation and Gap

Description

Year

2016

2026

2035

Sewage Generation (MLD)

1.71

2.14

2.69

Total Sewage Generation including infiltration (MLD)

1.88

2.36

2.96

STP Capacity (MLD)

1.97

2.48

3.11

Existing STP Capacity (MLD)

1.50

1.50

1.50

Augmentation required (MLD)

0.47

0.98

1.61

Source : Calculated as per CPHEEO Manual

* Proposed 1.50 MLD STP is under construction

9.2.2.1 Sewage Treatment and Disposal

Currently, the planning area generates 1.97 MLD of sewage. Projected sewage generation for 2035

will be 3.11 MLD. Currently, there is no facility for centralised/decentralized collection, treatment

and disposal of the sewage generated operational in Nadaun. However, a 1.50 MLD STP with

sewer network in Nagar Panchayat area is being constructed at the lowest level in the Nallah

between Dolee Gharan and Nagarada.

8438

jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939

9.2.3 Service Level Benchmarking

The service level benchmarks of Sewerage and Sanitation of the planning area has been presented

in the following.

9.2.4 Key Issues & challenges

Wide practice of septic tank in the planning area

Open defecation

Discharge of domestic sewage, rotten food materials and vegetation causing bacteriological

contamination of water

Table 9-5: Service Level Benchmarking for Sewerage and Sanitation (2016-2035)

Sl.

No.

Services

Ultimate Benchmark as

per MoUD, GoI

Guidelines (%)

Present

Status (%)

Aim to be

achieved in

Long Term

1

Coverage of Toilets

100

92

100

2

Coverage

of

Sewerage

Network Services

100

10

100

3

Collection Efficiency of

Sewerage Network

100

0

100

4

Adequacy

of

Sewage

Treatment capacity

100

0

100

5

Quality

of

Sewage

Treatment

100

0

100

6

Extent

of

reuse

and

recycling of sewage

20

0

20

7

Efficiency in redressal of

customer complaints

80

0

80

8

Extent of cost recovery in

sewage management

100

0

100

9

Efficiency in collection of

sewerage charges

90

0

90

Source : Based on NMSH, MoUD, GoI, 2014 and Data Collected

9.2.5 Proposals and Recommendations

1.

As per the gap and deficiency identified in the existing sewerage system of the study area,

an integrated approach is required to cater the sustainable solution.

2.

The project area needs to develop a proper integrated centralized/decentralized sewage

collection and treatment method. A new Sewerage network and 1.50 MLD STP is under

construction, but that need to be augmented to cater the sewerage generate from planning

area.

3.

Detailed designing of sewerage system (DPR). Provision of an efficient sewerage system

throughout the study area needs to be put in place which can be ensured by

Laying sewerage network lines

Sewage treatment needs to be carried out before disposal

To ensure hygienic condition and environmental sanitation

8439

jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939

The storm water drainage system of the planning area should be segregated from the

sewerage network.

4.

All the household/community septic tanks should be connected to the sewer network.

5.

Implementation of Centralized/ decentralized collection, treatment and disposal of the

sewage generated.

6.

Construction of adequate public toilets complex at public places.

7.

Possibilities of recycle/reuse of waste water shall be incorporated in the development plan

to reduce the burden on water supply system.

8.

Reuse options for Treated Wastewater

The outlet water quality parameters after treatment should be in accordance with IS: 10500.

Possibilities of reuse of waste water shall needs to be incorporated in the detailed

masterplan on sewerage system to reduce the burden on water supply system. Treated water

from STP should be recycled as per URDPFI Guidelines and sludge can be used as manure

for agriculture and plantation. It should be aimed to achieve 100% coverage of sewerage

connections to every household.

9.

Detailed Operation and Maintenance Programme

9.3 Storm Water Drainage Network

9.3.1 Existing Situation and Demand Estimation

Topography and natural drainage pattern of the area is from south-east to north-west, north and

north-east. Nadaun Planning Area has two natural water channels namely Beas River on the

northern and north-eastern side and Man Khad on the north-western side. Beas River flows from

north-east to north-west and Man Khad flows from north to south. The surface run off is mostly

toward north and north-west to south. The planning area is not vulnerable to floods.

In addition, there are number of Nalahs which have their outfall into these natural water channels.

These small water channels discharge runoff from the surrounding areas. Most of the drains are in

poor condition which requires de-silting, channelization and lining. The discharge from the Nalahs

flows into the Beas and Man Khad River as four places on the north-west bank of the river/khad

within the Nadaun town.

Nadaun Planning Area has a present road length of 43.32 km while pucca storm water drains are

existing for a length of 29.7 km and the remaining that is 14.85 kms of road length have kuccha or

no drains.

As per CPHEEO Manual on Sewage and sewage treatment, Clause 3.9 and its sub-clauses, Rainfall

intensity calculated from monthly rainfall data of last 11 years comes out to be 81.70 mm/hr.

considering once in 5 years as storm frequency and 30 minutes as Time of concentration. Rational

method was used for computation of run-off, which is recommended for urban areas by CPHEEO–

Drainage Design Manual.

8440

jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939

Figure 9-1: Intensity-Duration Curve

Source: Calculated based on CPHEEO Manual

The planning area is broadly divided into 16 catchments, which is further divided into smaller sub-

catchments. All the major Catchments draining itself to major streams/water bodies. Key feature of

the network is use of natural streams, to minimize the drain section. Several outfalls are proposed in

order to enable safe conveyance of runoff discharge. Two major streams flowing through the

project area receives run off through major catchment basin. The total runoff generated for entire

study is 132.41 cumecs.

9.3.2 Key Issues & challenges

The existing system suffers with the following deficiencies:

Unplanned storm water drainage system

Most of the drains are open

In absence of regular solid waste collection, wastes dumped into the drains, which leads to

choking and overflowing of drains.

The width of the existing drains is further narrowed because of encroachment, causing

obstructions to the free flow of storm water.

Systematic and integrated drainage plan for the study area is not in place.

The natural storm water is mixed with household/human waste which creates environmental

pollution and public health concerns.

The city has poor capacity for effective periodic maintenance of the drains in terms of

cleaning and de-silting.

9.3.3 Development Strategies

As an integrated approach, some of the drains will run alongside of the roads (Roadside Drains)

and others may follow natural slope (Cross Drain). The drains will run along the roads, either one

side or both side as per road camber. All the primary and secondary drains should be covered.

Wherever road of width is greater than 10 m, kerb opening inlets are proposed at every 50 m

interval to provide horizontal entry into the drain. And wherever the road width is less than 10 m

Perforated Cover Slabs are proposed at every 50 m interval.

8441

jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939

9.3.3.1 Rainwater Harvesting

Long term water level declines as a result of careless exploitation of groundwater resource has led

to several problems. Some of these problems are reduced well yields, low water level and leakage

into the aquifer of highly mineralised water. In order to over-come these serious environmental

implications, the recharge potential of groundwater resource has to be given utmost importance.

Rain water harvesting is the technique of collection and storage of rain water at surface or in sub-

surface aquifers, before it is lost as surface run-off.

9.3.4 Proposed Projects

Based on the existing system and gap analysis, there are some potential projects that can be

proposed.

1. Detailed Master Plan for Storm Water Drainage system for further detailed assessment and

solution of drainage proposal Storm water Drainage (SWD) system should designed as a

separate system to carry storm water by gravity for the entire project area. Storm water

drains are designed with a certain gradient, which will create a self-cleansing velocity, as

these drains will carry storm water along with grit, silt and other impurities. All the primary

storm water drains should be designed to have a capacity to carry the total discharge of all

secondary and tertiary storm water drains.

2. Detailed Hydrology study of existing nallahs/ canals/ river for proper flood management

plan and to improve efficiency to cater for storm water drains from collection to outfalls.

3. Detailed designing of storm water system (DPR)

4. Proper outfall structures

5. Existing nallahs running through the study area should be improved to increase the

efficiency of natural channels. Improvement works shall consist of desilting of channel,

development of banks, improvement of side slopes and development of green belt around

the nallahs and provision of culverts at road crossings.

6. It is very important for all upcoming new developments to have rain water harvesting

measures. Even government can improve the urban environment by providing recharge

wells at suitable locations.

7. Regular and proper operation and maintenance of drainage facility is essential to function. It

is also accepted that for quality maintenance of drainage system, optimum use of labour,

equipment and material is required to keep the system in good condition, so that storm

water is efficiently conveyed up to disposal point.

8. Rainwater harvesting system

9. Detailed Operation and Maintenance Programme

9.4 Solid Waste Management

9.4.1 Existing Situation and Demand Estimation

Nadaun Nagar Panchayat looks after the collection and transportation of solid waste in Nadaun

Town. Out of the 7 wards of Nadaun town, there is 100% door-to-door solid waste collection from

Ward nos. 2 to 5 and 80% collection from Ward nos. 1 and 6 while there is only partial collection

of solid waste from Wards no. 7. The primary door-to-door-collection of solid waste takes place

manually through 4 wheel barrows. The areas which are not served by door-to-door collection,

8442

jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939

community bins have been provided by the Nagar Panchayat. There are 7 dumper community bins

of size 4’ x 6’ x 5’and two small dust bins of size 1’x 1’ within the urban area. Loading and

unloading is done manually and waste is transported through a tractor owned by the Nagar

Panchayat. There is no door-to-door collection of solid waste in the rural areas of the planning area.

As per the Nadaun Nagar Panchayat, 8 to 9 quintals i.e., 0.8 to 0.9 MT of solid waste is generated

in Nadaun town per day for people in Nadaun town.

The collected waste in Nadaun Nagar Panchayat area is currently dumped at a solid waste dumping

site on the banks of Man Khad in Nagarada Village. A landfill site has also been proposed by the

Nadaun Nagar Panchayat in the close vicinity of the Dumping Site.

9.4.1.1 Projected SWM Generation and Gap Assessment

The number of waste generating inhabitants as well as collection is assumed to rise to a higher

percentage of the total population. With passing time as a consequence of ameliorated collection

systems the percentages are due to rise in coverage from 0 in 2016 to 100 in 2035 which leads to

increase in daily waste production.

The following table gives estimated solid waste generated in the planning area at the end of the

plan period (2035) and the estimated waste reaching the land fill site.

The following assumptions were considered:

Waste generated per day: 0.25 kg per capita per day.

Solid waste growth factor: 1.33 percent per annum (ministry of urban development

standard).

Quantity of solid waste reaching landfill: 39 percent of total waste (based on national

average).

Table 9-6: Solid Waste Generation and Gap

Sl. No.

Description

2016

2026

2035

1

Population

11106

13941

17501

2

Solid

Waste

Generation

Annual

(tons/day)

2.43

3.48

4.99

3

Annual

Cumulative

Solid

Waste

Generation (tons/day)

2.43

8.82

17.98

4

Existing Treatment Facility (tons/day)

0.90

0.90

0.90

5

Gap (tons/day)

1.53

2.58

4.09

Source : Calculated as per CPHEEO Manual and MoUD Standard

9.4.2 Service Level Benchmarking

Table 9-7: Service Level Benchmarking for Solid Waste Management (2016-2035)

Sl. No.

Services

Ultimate Benchmark as

per MoUD, GoI

Guidelines (%)

Present Status (%)

1

Household

level

coverage of

SWM services through door-to-

door collection of waste

100

10

8443

jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939

Sl. No.

Services

Ultimate Benchmark as

per MoUD, GoI

Guidelines (%)

Present Status (%)

2

Collection Efficiency of Solid

waste

100

NA

3

Extent of segregation of waste

100

NA

4

Extent of MSW Recovered

80

NA

5

Extent of scientific disposal of

waste of landfill sites

100

NA

6

Efficiency

in

redressal

of

customer complaints

80

NA

7

Extent of cost recovery for ULB/

NP/ Authorized agency in SWM

services

100

NA

8

Efficiency in collection of SWM

charges

90

NA

Source : Projections based on NMSH, MoUD, GoI, 2014

9.4.3 Issues and Concerns

The analysis of existing solid waste management practices of study area indicates that the city has

no structured primary and secondary collection, disposal arrangements. Integrated solid waste

management for study area requires the use of various instruments for improved service delivery.

Collection and storage of waste is an important issue which has great impact on the overall solid

waste management system.

Awareness levels in terms of importance of solid waste management has a huge scope for

improvement. Installation of community bins and regular collection and transportation of roadside

wastes to the identified dumping site need to be done.

Segregation of waste needs to be done before transfer to landfill site.

The range of issues that needs to be addressed are listed below.

Effective public participation in segregation of recyclable waste and storage of waste at

source.

Effectiveness of awareness building or direct community involvement.

User Charges.

Waste Minimization and Recycling.

Integrated Waste Treatment.

Regional Sanitary Landfill Facility.

Institutional strengthening and human resources development.

9.4.3.1 Private Sector Participation in SWM at Urban Local Body Level

Given the lack of in-house capability of municipal authorities and paucity of financial resources, it

is desirable to outsource certain services and resort to private sector/NGO participation in providing

SWM services.

8444

jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939

Experience the world over has shown that private sector participation (PSP) results in cost savings

and improvement in efficiency and effectiveness in service delivery mainly due to financial and

managerial autonomy and accountability in private sector operations. Besides, it brings in new

investment and better technologies. In developed countries the private sector manages most of the

SWM services.

In India, by and large, municipal authorities are providing solid waste management services

departmentally. Resistance from labour unions and interpretations of labour laws have discouraged

city administrations from contracting out services to private operators. Of late, some experiments to

privatize certain SWM services have demonstrated improvement in the level of services in a cost-

effective manner.

It is proposed that an integrated Solid Waste Management System as being developed for

Sundernagar cluster, Mandi be developed for Nadaun and surrounding areas.

9.4.4 Proposed Solid Waste Management Projects

For achieving the goal and implementing the strategies various projects need to be undertaken.

Some of the proposed projects are-

An integrated cluster based solid waste management to be developed for Nadaun and

surrounding towns and villages.

100% door to door waste collection.

Waste transfer stations which will include the following:

a) Decentralized compost plants

b) Sorting and recycling yards

Proper Waste collection and transportation.

Segregation of biodegradable and non-biodegradable at source

Resource recovery through sorting and recycling of materials.

Resource recovery through waste processing by using composting or waste to energy

approaches.

Waste minimization by reducing volume, toxicity or other physical/chemical properties of

waste to make it safe for final disposal.

Disposal of waste in an environmentally safe and sustainable manner through land filling.

Recycling of Solid waste

Commissioning of landfilling site.

Integrated management of Solid waste.

Awareness generation for reduce, reuse and recycling of Solid waste

Waste treatment facility Sanitary landfill.

Incineration for treatment of biomedical waste

Information Communication Education (ICE) for solid waste management.

9.5 Electrical Network

9.5.1 Existing Situation

Power is supplied in Nadaun Planning Area by the Himachal Pradesh State Electricity Board

Limited (HPSEBL). Hydroelectricity is the main source of power supply for HPSEB as well as

HPSEB exports power through major transmission lines to various parts in India.

8445

jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939

The power supply of Nadaun town is being managed from 2X16/20MVA, 132/33kV DEHR

substation which is 22.7km (ckM) and from 2X25/31.5MVA, 132/33kV Hamirpur – I Substation

which is 19.4km (ckM) away from Nadaun. The other available power source is Hamirpur-II

(Mattan Sindh) with 3x80/100 MVA, 220/132 kV.

Based on the information collected during site visits, it is found that four no's. 11kVFeeder,

emanating from Gagaal 33/11kV Substation feeding the Nadaun Town area. The details of existing

power infrastructures are as presented in Table 9-8

9.5.2 ower Demand Forecast

Load demand/forecast is the first stage in planning any power system. It serves as an input for the

most critical areas of the power system planning namely, generation, transmission, and distribution

planning and tariff setting. The aim of load forecast study is to provide a comparative between the

projected Peak Demand Load and projected Energy Consumption for the next 20 years. This load

forecasting study will help to propose generation, transmission and distribution expansion programs

on the basis of economic activities and population growth at Nadaun Town

After analysing the data, it is found that the key factors which can affect the load forecast for the

Nadaun town for the next twenty years are as follows:

- Estimation of suppressed demand

- High level of unmetered sale

- High transmission and distribution losses

Table 9-8: Details of existing power infrastructure

Particular

Unit

Details

A. Basic Information

Total Number of Consumers

No.

2143

Total Population (as per 2011 census)

No.

9912

B. Asset Information

Total Number of 33/11 kV Sub-stations feeding the

Project Area

Numbers

1

Number and capacity of Power Transformers

Numbers/MVA

*Not Available

Total Number 11 kV Feeders feeding the Project

Area

Numbers

4

Total Length of 11 kV Feeders

kM

*Not Available

Total Number of Distribution Transformers

Numbers

18

Total Capacity of Distribution Transformers

MVA

2

C. Commercial Information

Unit

FY (2013-14)

FY (2014-15)

FY (2015-16)

Particulars

Energy Input

kWH

18438687

20717767

20948734

Metered Energy Sales

kWH

15070729

16573398

17342013

Assessed Energy

kWH

16694382

17331496

17772591

Total Energy Billed

kWH

15713051

18094294

19387313

Revenue Billed

Rs. lac

86591871

87581543

113951420

Revenue collected

Rs. lac

78186824

84306415

92519284

Billing Efficiency

%

85%

87%

92%

Collection Efficiency

%

90%

96%

81%

AT&C Losses

%

23.05%

15.93%

24.97%

Source: HPSEB

8446

jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939

DETAILS OF EXISTING LOAD DISTRIBUTION AND DISTRIBUTION TRANSFORMERS (FEEDER WISE)

SUBS

TATI

ON

NAM

E

33/11kV Gagaal SS

FEED

ER

NAM

11kV Feeders (Nadaun, Kolah-Sera, Bhumpal, Majheen)

DT

No.

Locati

on of

DT

Rating

of DT

Max Demand

T

ot

al

N

os

.

of

co

ns

u

m

er

Domestic Load (Authorized)

Commercial Load (Authorized)

NDNC

Others Load

Max

Demand

Ad

diti

ona

l

De

ma

nd

due

to

Lo

ad

Gr

owt

h

for

5yr

s

Antic

ipate

d

Max.

Dem

and

at

the

end

of

horiz

on

year

Remarks

1- Ph

Tota

l

1- Ph

T

ot

al

Name

of the

Reven

ue

Villag

e /

Dist.

SS

kVA

kVA

No.

kW

kW

No.

kW

k

W

No.

kW

No.

kW

kW

kV

A

kVA

A

Nada

un

Feede

r

1

Nagar

ada

(NP)

100

181

1

3

0

100

100

100

29

58

58

1

5

0

163

36

217

Feeder wise consumer

details data need to be

rechecked

2

Dolee

Ghara

n (NP)

- VTH

250

372

2

5

1

176

176

176

70

140

14

0

3

15

2

4

335

74

447

3

Seri

(NP) -

Nadau

n

250

1014

7

1

3

531

531

531

175

350

35

0

6

30

1

2

913

203

1217

4

Kutha

r -

Kutha

r I

25

81

6

9

65

65

65

4

8

8

0

0

73

16

97

5

DPF

Kutha

r -

Kutha

r II

25

108

7

6

55

55

55

21

42

42

0

0

97

22

129

6

Bela

100

59

3

9

25

25

25

14

28

28

0

0

53

12

71

B

Kolah

-Sera

Feede

r

1

Bharm

oti

Kalan

-

Bharm

oti I

250

78

6

2

54

54

54

8

16

16

0

0

70

16

93

2

Bharm

oti

Kalan

-

Bharm

oti II

25

47

3

6

30

30

30

6

12

12

0

0

42

9

56

3

Bharm

oti

Kalan

-

Mang

al I

63

27

2

2

20

20

20

2

4

4

0

0

24

5

32

4

KOT

(NP)

100

241

2

0

9

201

201

201

8

16

16

0

0

217

48

289

Overloaded

C

Bhum

pal

Feede

r

1

Jalari-

Saunk

hlan -

Jalari

I

100

150

1

3

5

135

135

135

0

0

0

0

135

30

180

Overloaded

2

Harma

ndir

Mandi

ala -

Jalari

III

63

26

1

5

7

7

7

8

16

16

0

0

23

5

31

3

Harma

ndir

Rukw

alan -

Jalari

II

100

163

1

2

0

93

93

93

27

54

54

0

0

147

33

196

Overloaded

4

Gagaa

l -

Jalari

IV

63

97

7

7

70

70

70

6

12

12

1

5

0

87

19

116

Overloaded

5

Gagaa

l -

Degre

e

Colleg

e

100

66

5

3

50

50

50

2

4

4

1

5

0

59

13

79

D

Majh

een

Feede

r

1

Tillu

DPF -

Tillu

250

77

6

6

63

63

63

3

6

6

0

0

69

15

92

2

Tillu

Khas -

Tillu I

25

8

7

7

7

7

0

0

0

0

7

2

9

3

Tillu

Pratha

m -

Tillu

II

63

70

6

3

63

63

63

0

0

0

0

63

14

84

1952

2863

2

1

4

3

1745

1745

1745

383

766

76

6

12

60

3

6

2577

573

3436

In this study, the settlements have been categorized based on population and urbanization level.

The per-capita or per-household electricity consumption will vary from one type to another

depending on the population growth and the expected future development in each type.

8447

jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939

9.5.3 Key Assumptions in Demand Forecasting

Growth Rate of Energy Input as 4.35%-

Growth rate of Energy Sale as 7.26%

9.5.4 Expansion Proposal:

Based upon the cumulative power usages and growth rate above, the projected load forecasting of

the Nadaun town over the next 20 years is given below table.

Years

2016 -2021

2021 - 2026

2026 - 2031

2031 - 2035

Power Demand

(MW)

3.42

4.5

6

7.98

The estimated power requirement of Nadaun Town till 2035 is 7.98MW. To meet the additional

power requirement till 2035, the addition or augmentation of existing 33/11kV Gagaal Substation

shall be required and addition of new primary and secondary substation with addition/ upgradation

of subsequent distribution networks.

9.5.5 Planning Criteria

The power infrastructure development of Nadaun Town is proposed with HVDS system by

extension of 11kV Network and potential reduction in Low Voltage Network. For implementation

of HVDS system, new 11kv feeder will be created including augmentation and bifurcation of

existing 11kV feeders to improve the quality of power supply and Reduction in distribution losses.

All the consumers are to be feed through energy meters which is RS 485 enabled, with a futuristic

view for implementation of SCADA.

The planning has been optimized to minimize the overall cost. This optimization considers the

numbers of circuits requirement, it`s capacity of distribution and also the location, timing and

additional capacity of the proposed network during operation. The optimization includes an

assessment of cost for OH distribution network considering the impact of projected load growth.

The following critical areas also need to be attended for improve the energy efficiency.

i

Introduction of energy audits and design of energy efficient buildings and network

ii

AT&C losses reduction

iii

Load management techniques and energy accounting

iv

Promotion of new and renewable sources of energy, and reduce demand of

conventional power.

v

Replacement of low efficiency incandescent lamp with LED.

9.5.6 Street Lighting

Roads of the development area shall generally cater to-

i. Movement of goods, persons through vehicles including cyclist/pedestrian.

ii. Basic requirement of road, green area and periphery lighting proposed be as follows:

iii. Adequate level of illuminations for vehicles/cyclist

iv. Uniform illumination level over carriage way with minimum glare

v. Safety of movement

vi. Minimum disturbance during fog/dust conditions

vii. Use of high efficiency lighting fixtures with high lumen output and low power consumption

viii. Beautification and pleasing view

ix. The Street lighting should be provided with LED luminaries on decorative street lighting

poles.

8448

jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939

Table 9-9: Technical Details of Road Lighting System

S.NO.

DESCRIPTION

Upto 18 M WIDE ROAD

(Primary Road)

3.5M WIDE ROAD

(Secondary Road)

1

Area of Installation

Mixed, Residential

Mixed, Residential

2

Pole Mounting detail

Single arm pole on single

side of the road.

Single arm pole on single

side of the road.

3

Lighting Fixture

1 x 72W, LED Light

1 x 40W, LED Light

4

Mounting height

8Mtrs.

4Mtrs.

5

Spacing

25M

30M

9.5.7 Proposals and Recommendations

1.

Flood light to be installed at major junctions within the town viz., Inderpal Chowk,

Gurudwara Chowk, Labour Chowk, Post Office Chowk and near Kangra Co-operative

Bank.

2.

Solar street lighting is proposed to be installed along the road within the planning area.

9.6 Telecommunication System

The telecom services provided in Nadaun are as follows:

i.

Landline operations requiring a telecom cable and junction box space in utility corridor

ii.

Wireless services on GSM / CDMA platform requiring tower at stipulated radii

iii.

Broad band Services requiring a cable corridor and distribution chambers

iv.

Short Coverage Wi-Fi networks

A telecommunication network is proposed to be provided in a manner so as to have connectivity by

different service providers. Consumer can select the services of telecom service provider according

to good quality of network for providing these data and tele communication facilities.

In order to achieve it, Optical fiber cables are proposed to be use to provide and connect various

service providers for telecom as well as broadband services to the users through the optical fiber

network. To run the cabling, the provision for laying the conduit and chamber in front of all the

plots has been proposed.

It is envisaged that all the people will have at least one mobile connection in person and one

landline connection in each house. In addition all the shops, offices industries and other institutions

buildings will have landline connections. Hence, the estimated that the number of mobile

connections would be 19251 and that of landline/ broadband would be 6456. Refer for further

details.

Table 9-10: Telecommunication Connections, 2035

S. No.

Description

Mobile Connections

Landline Connection

1

Population

17501

2

Households

3889

3

Industry

223

4

Govt. Inst.

893

8449

jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939

5

Institutional

112

6

Wholesale Trade

449

7

Retail-cum-shopping

893

8

Floating Population

1750

TOTAL

19251

6459

Source: Estimated based on Housing and Economic Projections

Presently, there is a telephone exchange in Nadaun, which is sufficient to cater to 50,000

population. Hence, for the extension of services to new areas, additional network lines needs to be

laid.

Thus, it is proposed that telecommunication ducts be laid along the roads within the service/utility

corridor with provision of conduit and chamber in front of all the plots.

10

Environment

10.1 Introduction

Himachal Pradesh is enriched with various species of flora and fauna which need to be conserved

and preserved. The development should go hand in hand with environmental improvement and

resource optimization. The sustainable growth can only be achieved if existing environmental

parameters are identified and analysed.

10.2Forest Cover

In Nadaun Planning Area, 13.48% land is covered by forests. It is less than the district average i.e.

21%. The south-eastern portion of the Planning area is under Demarcated Projected Forest (DPF)

cover namely DPF Tillu and DPF Kuthar, located at the both sides of NH-3.

Out of the total forest area, 91.84% is categorized as the Demarcated Protected Forest and 8.16% is

Other Forest. Refer Map E\04 for Forest Cover in the Planning Area. These forest areas shall be

conserved and would function as green lungs Nadaun Planning Area.

The Other forest can be used for collecting forest produce ensuring livelihood for the local people

in the area. Afforestation and regularized tree felling can be promoted for boosting the forest

related economy in the region.

Forest is an important asset to planning area and need to be safeguarded for providing sustained

benefits to the community and diversion of such land to other purpose should be done after careful

examination from social and environmental standpoint.

A buffer around the boundary needs to be maintained as per the HP TCP Rules, 2015. The

minimum distance of 5.00 m from Forest boundary and minimum distance from existing tree shall

be 2.00 m shall be maintained. 19

19 Himachal Pradesh Town and Country Planning (Amendment) Rules, 2015

8450

jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939

10.3 Air Quality

There are no air quality monitoring stations located within 10Km. of the Nadaun town. According

to the CPCB standards there should be an air quality monitoring station near each major settlement.

The air quality analysis cannot be presented as the nearest monitoring station is located at Una

which is almost 71 km from the Planning area.

10.4 Water bodies

10.4.1 Surface Water

The planning area fall within drainage basins of Beas River. The Kunah Khad and Man Khad form

the eastern and western boundaries of the Planning area. There are ample numbers of surface water

sources which are utilized for supplying the potable water to the households.

The quality of water of the Beas River and Man Khad is within the permissible limits. The water is

alkaline in character with high Dissolve Oxygen and low BOD. As per the CPBC standards the

water in both Beas and Man Khad are fit for drinking after disinfection. Refer Table 0-1.

Table 0-1 Water Quality Monitored in between Dhera Bridge and Nadaun Bridge

Indicators

Present

Condition

According to

CPCB Standards

PH Level

8.65

6.5-8.5

DO Level

7.6

6.0

BOD

Level

1.0

2.0

Source: HPSPCB and CPCB Standards

10.4.2 Conservation of Water-bodies

As per the MoEF guidelines20 100m buffer from HFL of the river should be given. However,

Himachal Pradesh being a hilly state where land is scarce, the state has adopted a policy of limiting

buffer to 25mt. No building activity shall be carried out within this 25m buffer protection from the

HFL of river Beas and the same shall be maintained as green buffer zone. The construction shall be

allowed at distance of 3.00 Metre and 5.00 Metre from Nallah and Khad respectively21.

The river front areas may be developed based on proper planning with proper shelter design on the

water expanse with attractive laser shows for tourists and visitors during festive seasons.

Any degradation of wetland or surface water body would lead to habitat loss for birds, aquatic

species and rare vegetation. To check depletion of water bodies the development plan recommends

the following-

Dumping of waste in the water bodies is prohibited

Encourage suitable recreational facility around water body to keep surveillance.

10.4.3 Ground water

20 Since the River Regulation Zone Guidelines are in formulation/ draft stage. Hence, CRZ guidelines have been

referred to.

21 Himachal Pradesh Town and Country Planning (Amendment) Rules, 2015

8451

jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939

Ground water resources and irrigation potential of the region has not been studied and computed as

per the GEC-97 methodology, as the aquifers are isolated and discontinuous in nature. Ground

water quality is within the permissible limit of safe drinking water set by Bureau of Indian Standard

(BIS)22.

Major potential areas for the ground water development are the valley fill deposits, occurring along

Beas River between Sachuhi and Nadaun, lower reaches of Man khad and central part of Kunah

Khad. The aquifer thickness may vary from less than 10 m to about 100 m so far, the valley fills or

fault zones have not been explored or studied on macro level for assessing the potentialities of

ground water resources in the district. Rainfall infiltration is the principal source of ground water

recharge to the aquifer system in the district. Inflow seepages from khads/ rivers also contribute to

the ground water resources/reserves

10.4.4 Rain Water Harvesting

Individuals can do a great deal to improve the water availability and ensure the water quality of

their locality by practicing Rain Water Harvesting as a mandatory measure in all public buildings

as well as judicial use of storm water for agricultural use. In this regard, many published standard

manuals are available for adoption.

10.5 Disaster Prone Areas

10.5.1 Hamirpur District

District Hamirpur is prone to various hazards both natural and manmade. In the district the

geological hazard, mainly earthquakes, landslides and soil erosion are most critical than hydro-

metrological hazard i.e., the flash flood, cloud burst and drought and forest fire.

The disasters, which generally occur in this district and their level of vulnerability is shown in

Table 10-2. According to Hazard Vulnerability of Himachal Pradesh, Hamirpur district has High

threat of Earthquake and Very High threat of forest fire. (District Disaster Management Plan

Hamirpur, 2016).

Table 0-2: Type of disasters in Hamirpur District

Source: Disaster Management Plan Hamirpur, 2016

Table 0-3: Ground Water Quality, Hamirpur District

Indicator

s

pH

EC

μS/cm

at 25°C

HCO

3

Cl

So4

NO

3

F

C

a

M

g

N

a

K

Total

Hardness as

CaCO3

(in mg/l)

Min

8.0

2

280

12

10

1

2

Tr

30

11

7.

5

0.

6

120

22 Ground Water Information Booklet, Hamirpur District, Himachal Pradesh

Hazard Type

Level of Vulnerability

Earthquake

High

Landslide

Low

Floods

Low

Forest Fire

High

Drought

Medium

Cloud Burst

Low

8452

jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939

Max

8.1

7

360

153

12

5

85

22

0.1

6

48

17

14

5.

8

165

Source: Ground Water Information Booklet, Hamirpur District, Himachal Pradesh

Figure 0-1: Earthquake Hazard Map

Source: Department of Environment, Science and Technology, Himachal Pradesh

8453

jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939

In terms of Earthquake hazard risk profiling, almost entire Hamirpur district (91%) falls in Zone V

which is a very high damage risk zone. The last earthquake hit the region in 1905 which took a toll

of death of almost 20,000 people in the region with a magnitude of more than 8 (according to the

Richter scale). The following

Figure 0-1 shows the intensity of earthquake hazard zones in all over Himachal Pradesh.

10.5.2 Nadaun Planning Area

Nadaun Planning area is prone to natural hazard like earthquake. Nearest structural fault line is 600

meters away from northern boundary of planning area. Though there is no structural fault line in

Nadaun Planning area but it is important to take measure in order to avoid earthquake disasters.

However due to unstable sub-soil in the hilly terrain in Bela village, there are few occurrences of

landslides during rainy season near SDM Colony. The area has also been demarcated as landslide

prone area by the administration.

The planning area is also vulnerable to road accidents and fire incidents.

In spite of being located in high vulnerability zone in terms disaster intensity, no such preparedness

mechanisms are observed at individual and community level.

10.6 Measures for Disaster Management

DDMP Hamirpur, 2015 shall be adopted for prevention, mitigation and preparedness plan.

Wide dissemination of earthquake-resistant building codes, the National Building Code 2005 shall

be adopted for earthquake resistant structures.

A Disaster Management Centre has been proposed in Nadaun planning area on 1 ha of land in

Bharmoti Kalan area with suitable open area (2 ha) for soft parking, temporary shelter etc. This

centre would accommodate a Fire Station and Trauma Centre for coordination at the time of

emergencies. The Trauma Centre should be on 1 hectare of land and have a minimum of 100 beds.

This would be linked with lower order Trauma Centres to be provided in selected hospitals

The following policies and strategies for Disaster Management are proposed:

10.6.1 Pre-Disaster Preparedness

The Fire Services department being the nodal agency for disaster management, should

identify vulnerable areas e.g. areas with high density and poor accessibility in the town

and propose suitable measures.

Sensitize people about after effects of disaster particularly school children.

Make people aware through media campaigns and advertisements about emergency

procedures and location of emergency shelters etc.

Undertaking mandatory safety audits on structural designs of Old and New major

building/projects by the respective competent authorities related to all Government and

Private Buildings.

The mock drills to tackle the disaster situations should be arranged under SDM’s

supervision. This should be organised in every local govt. authority (both Gram

Panchayat and Nagar Panchayat) in a particular interval.

Disaster relief Committee should be set up at Gram Panchayat Level and Nagar

Panchayat level where involvement of a particular percentage of female members

would be mandatory.

8454

jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939

10.6.2 Post Disaster Management

It has been observed that any disaster is generally followed by break down of communication lines

and disruption of essential services. Therefore, the key communication centres should be safely

located to be free from natural disasters e.g. flood, fire and earthquake with provision for wireless

and satellite based communication facilities.

Figure 0-2: Tehsil wise forest fire risk area of

Hamirpur district

Figure 0-3: Probabilistic seismic hazard

analysis

Source: Hazard Vulnerability and Risk Analysis

Atlas, Disaster Management Cell, Department

of Revenue, HP

Source: Hazard Vulnerability and Risk Analysis

Atlas, Disaster Management Cell, Department

of Revenue, HP

8455

jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939

Figure 0-4: Location of Lineament and Landslide Prone Area in Nadaun Planning

Area

Source: Bhuvan HP state portal http://bhuvan.nrsc.gov.in/state/HP#

10.7 Forest Fire Measures

Capacity building for the better use of early warning (technical efficiency and HRD): The forest

officials need to be trained in using various indicators to get prior information about forest fire at

the earliest time possible to take timely action. The forest department may be provided with

necessary equipment in detecting forest fire at the earliest possible. Forest officials are to be trained

in using various valuable information, available at national and international levels and translate it

for local use.

Construction of watch towers for monitoring fire incidence is essential and shall be included in

zonal management plan.

11

Stakeholder Consultation

11.1 Introduction

This chapter describes the outcomes of the participatory process adopted for the preparation of the

Nadaun Development Plan. A rigorous stakeholder consultation Programme was adopted to take

inputs of all relevant stakeholders at State, District and Town level. The consultation Programme

was executed at 2 levels as follows: -

Town Level Consultations (Ward wise public consultations, consultations with Nagar

Panchayat, local politicians, Government officers and citizens)

Landslide

Prone

NH 03

N

H

03

NH 303

8456

jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939

Household level consultations (questionnaire survey)

During the Inception stage a number of discussions and meetings were conducted to introduce the

process of preparation of the Development Plan to the citizens of Nadaun. The process of

consultations was continued in all stages.

11.2 Stakeholder Profile

The Stakeholders can be broadly classified as follows:

CATEGORY

STAKEHOLDERS

Town Level

Ward wise public consultations

Members of Nagar Panchayat, Local politicians

Government officers

Citizens

Representatives of health sector

Representatives of Traders and Industrial Associations

Academic Institutes

Representatives of Real Estate Developers

Media

NGOs

Household Level

Local residents

Various stakeholder groups were identified during the Initial Stage of Project. Two core groups of

stakeholders were identified: -

Primary Stakeholders, beneficiaries of a development intervention or those directly

affected (positively or negatively) by it. They include local population (resource persons,

community, students etc.) in the project/program area, poor and marginalized groups who have

traditionally been excluded from participating in development efforts such as kachhi basti and

slum dwellers, and organizations such as NGOs, trader’s organizations, hoteliers and other

associations.

Secondary Stakeholders, those who influence a development intervention or are indirectly

affected by it. They include the borrowing government, line ministry and project staff,

implementing agencies, local governments, civil society organizations, private sector firms and

other development agencies.

11.2.1 Local Steering Group

A Local Co-ordination committee was formed by TCPD. This committee was chaired by the TCP

(Hamirpur).

Table 0-1 Local Level Steering Group

OFFICIAL MEMBERS

Town and Country Planner(Hamirpur)

Chairman

Secretary (NP Nadaun)

Member

Planning Officer (Hamirpur)

Member

Assistant Town Planner(Hamirpur)

Member Secretary

NON-OFFICIAL MEMBERS

Planning Officer (Retd.)

Member

The two main functions of this group are:

1. Eliminating any bottleneck in project progress.

8457

jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939

2. Guidance in Visioning and Policy matters.

11.3 Consultation Programme

Major Issues highlighted by Stakeholders

The major issues in the town highlighted by various stakeholders are listed below.

Date: 25th October, 2016

Venue: SDM Office, Campus Hall

Number of participants: 44

Issues/Suggestions

Environment

1. Alternative new sources of energy should be developed.

2. Open-defecation should be control near the Beas River.

3. For water conservation, the maintenance of Beas River and its buffer area is

necessary.

4. Tree plantation should be initiated every year on fixed target 1,000 trees per

year.

5. There should be development of a botanical garden.

Roads and Transportation

6. There should be installation of solar traffic signals at every main road junction.

7. The encroachment should be removed along the roads.

8. Parking provisions should be proposed at a suitable place or near the Petrol

Pump.

9. Accidents frequently occurs on National Highways because of high speeding

which causes several deaths, so there should be some provisions of traffic signals

and sign boards along the NH at a suitable distance.

10. Pedestrian pathways should be provided within the urban roads.

11. NH road should be four lanes.

12. More connecting roads needed in town.

13. Bus Stand should be shifted near

14. Encroachment of roads and other land should be checked.

Water Supply, Sewerage and Drainage, Electricity and Other Services

15. Fire station should be proposed inside the town.

16. All wards should be provided with piped water supply.

17. Sewerage system should be provided in the town.

18. Advanced water treatment plant should be constructed.

19. Old wells should be repaired.

20. Water stagnation in the Bus Stand.

21. Provision of waste collection Bins at suitable fixed locations.

22. No Drainage System in the town.

23. Nallah should be channelized.

24. Landfill and Dumping sites should be provided for the town.

8458

jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939

Housing

25. Proper arrangement of housing for slum dwellers.

26. All residents living in Kuccha Houses should get Pucca Houses.

Social and Economic Aspects

27. Improvement of Health facilities.

28. Higher Education institutes needed.

29. Educational and Commercial Hubs should be proposed within the town.

30. Horticulture should be encouraged and proposed.

31. Employment opportunities should be provided for the people.

32. A planned Market should be constructed.

33. Community Hall should be constructed in every ward.

34. Good Cinema Halls and public recreation places should be developed.

35. Police patrolling should be increased in all wards.

Tourism

1. Government should promote Nadaun as a tourist place.

2. Paudiyan should be preserved by the concerned authority.

3. Pattan Bazaar should be taken into account for tourism purpose.

4. Heritage sites should be conserved e.g. Nadaun fort, Gurudwara, etc.

5. Town’s image and aesthetic look should be improved to boost tourism.

6. Taxi rates should be notified by Govt.

Governance and Other Aspects

7. Public participation should be ensured in Town Development Planning.

8. Unauthorized development should be stopped in the town.

11.3.2 Proceedings of Town Level Consultation Meeting

A one-day Stakeholders’ Consultation Meeting was held at SDM Office, Campus Hall, Nadaun.

Around 44 people participated in the Meeting.

Meeting Proceedings

The stakeholders appreciated the participants for their contribution in town’s development. He

described various major issues of the town, like in water supply, solid waste management, traffic

and transportation, sewerage, drainage, etc. He talks about the improvement in the public services

like parks and playgrounds, education, health, affordable housing and also talk about the need in

environmental facilities like solar power generation, waste management, Rain water harvesting, etc.

Apart from the above inputs, he also talks about some other facilities which should be proposed in

the city like firefighting department, Children’s playground, vehicular parking area, conservation

and maintenance of various historical paudiyan along the Pattan bazaar till Beas River.

Few raised various issues for town progress. He suggested that there should be a provision of street

light on the police station road and Beas river Bridge, provision of Traffic lights at all the junctions

is an urgent necessity, taxi rates should be decrease and notified by Govt., stray animals are a major

issue for the town hence government should take action and solve this problem.

Outcome of Meeting

8459

jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939

Sectors which needs to be addressed on highest priority were identified.

a.

Sanitation

b. Waste management

c.

Sewerage

d. Drainage

e.

Tourism

f.

Encroachment and haphazard development

g. Economic opportunities

h. Traffic and Transportation

i.

Environment

11

SWOT Analysis

S T R E N G T H

W E A K N E S S

1. Located at a Strategic Junction: The

Planning Area is located at a strategic

junction of NH-3 and NH-303. It has

direct connectivity with all the important

District Head-quarters State Capital

(Shimla), Chandigarh and Delhi by road.

2. High Decadal Growth: Nadaun had

witnessed a higher decadal growth in the

past two decades as compared to the

District.

1.

High Literacy Rate: The Planning

Area has a higher literacy rate of 91% as

compared to that of the District.

2.

Regional Trading Centre: Nadaun

is traditionally a trade town with a very

competitive market Nadaun being a Hub

of Trade and Educational facilities

witnesses

a

huge

daily

floating

population of children, traders and

visitors.

3.

Educational Hub: Nadaun is host to

a large variety of educational facilities

starting

from

primary

to

higher

secondary schools to Degree College to

professional and vocational institutions.

1.

Congested Market: Nadaun is not

vulnerable to water based natural

hazards as such Floods. But, it is highly

susceptible to man-made disasters such

as road accidents (on the NHs) and

stampede (Pattan Bazaar). Fire is

another

hazard

which

is

highly

vulnerable due to small congested

market area.

2.

No Pedestrian walkways: There are

no facilities for pedestrian walkway in

the planning area.

3.

No traffic management in the

planning area which causes traffic

congestion.

4.

No Designated Public Parking

Places.

5.

Inadequate

Public

toilets

in

market.

6.

Inadequate public parks and other

recreational facilities.

7.

Irregular and insufficient Water

supply.

8460

jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939

4.

Rich Agricultural Belt: Developed

on the banks of the River Beas, Nadaun

is rich in agriculture and horticulture

produce especially fresh local vegetables.

5.

Large Forest Cover: Nadaun has

about 1/3rd area under forest including

two DPFs which acts as permanent green

lungs to the planning area.

6.

Cricket Ground positioned at

National Level: Nadaun is host to Atal

Bihari Vajpayee Cricket Stadium which

has the capacity to hold national level

cricket matches.

8.

Poor

Physical

Infrastructure:

Nadaun

has

inadequate

basic

infrastructure facilities like drainage,

sewerage and solid waste management.

9.

Degradation

of

Natural

and

Cultural Heritage

10.

Community Facilities: Inadequate

number

of

community

halls

and

community facilities.

11.

Lack of Disaster Management Cell

in the planning area.

12.

No Fire Station: Even though there

is high risk of fire within the Nadaun

Town, there is no fire station in the town.

O P P OR T U N I T Y

T HR E A T S

1. Huge Tourism Potential

Old heritage structures can be

conserved for promoting heritage

tourism

Riverfront development can be

done to encourage tourism.

Eco-tourism can be introduced

in the green lungs of the

planning area

Cricket stadium can act as a

catalyst for sports tourism.

2. Potential

for

Agro-based

Industrial Base: Nadaun lies in the

agriculture and horticulture belt and

has huge potential for processing

and packaging industries in the

planning area.

1. High Risk of Natural Disasters:

The planning area falls in Zone V

which is a very high damage risk

zone. This might act as a deterrent in

development of this area.

2. High Investments: Development

will involve high cost in laying and

maintaining

infrastructure

for

tourism. Hamirpur being district

headquarter may get more priority

for development as compared to the

Planning area.

13

Development Proposals

13.1 Planning Perspective

The Development Plan caters for three levels namely the Nagar Panchayat, Planning Area and

Influence Zone with a radius of about 20 kilometres. It envisages for the requirements of population

of Planning Area, dependent regional population and tourists during peak season. The proposals

8461

jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939

have been recommended in view of community aspirations, effective role of local bodies, and by

inculcating the participatory approach of private and public sectors. The Development Plan is

contemplated as a document of common man, a document of the public/community and that of the

local bodies, authorities and the Governance.

13.2 Projections

Projections for the Development Plan have been worked out in view of analysis of surveys and

studies and the anticipations emanated thereof on one hand and public aspirations, on the other.

Population of Nadaun Planning Area is anticipated to increase to 17501 by the year 2035. As 51

percent of the total population is anticipated to be workforce, there are likely to be 8926 workers,

for whom provision of work areas is envisaged in the Development Plan.

13.3 Growth Drivers

Locational advantage:

The Planning area is located at a strategic junction point of NH-3 and NH-303. It has direct

connectivity with all the important district head-quarters and state head-quarter of Himachal

Pradesh, Chandigarh and National Capital by road. The villages inside the Planning Area connected

by the village roads. Settlements have been developed in a scattered way inside the Planning Area

due to its terrain and physical attributes.

Emerging Growth nodes and direction of development:

The major growth center is Nadaun town. The direction of growth is along the highway towards

Hamirpur. The growth nodes have been identified in the Planning area based on the Population

distribution, service allocation and exiting connectivity. The growth nodes are the second order

settlements which serve the third order settlements in the Planning area. The identified growth

nodes are located at Bela, Gagaal and Jalari.

Administrative importance:

Nadaun is the sub-divisional head quarter of Nadaun Tehsil. It is also the block head quarter of

Nadaun block.

Education institutes

There are few important education institutes located in the Planning Area near Nadaun Town like

Himachal Institute of Pharmaceutical Education and Research, Him Institute of Fashion Designing,

Vijay Vallabh College of Education, Sidharth Government College, Maa Jwala ITI etc.

Commercial Zone

The town was known as the Pattan or the ferry town. The town is the main commercial hub in the

region.

Places of Interest:

There are various places of interests in and around the Nadaun Planning Area. The Dasvin Patshahi

Gurudwara and Atal Bihari Vajpayee Stadium are located in the Nadaun Planning Area. The

Jwalaji temple is located 11 km north to the Planning Area. The Sansar Chand Fort is located at

Sujanpur which is almost 30 km from Nadaun Town.

8462

jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939

13.4 Development Limitations

1. A large part of land in the planning area is covered with demarcated forest area which

needs to be preserved and conserved.

2. Agricultural land available near the Khad and the River would be retained as rich

agricultural land.

3. About 2.05 ha of land is located at steep slope zone i.e. more than 45˚ which is

completely non-developable.

4. About 120.90 ha of land is under forest which has to be conserved and hence not

available for development.

5. About 27.64 ha of land is under green buffers and water bodies which also needs to be

protected

Thus, 728.80 ha of land is available for development in the planning area. Out of which 132.60 ha

of land is already developed. Hence, the net area available for future development is 596.20. Ha.

Refer Map No. A/05.

13.5 Concept

It is envisaged to develop Nadaun Planning Area as a tourism-cum-trade hub with encouragement

to agriculture. As the planning area has the potential for development of Mandi town due to

pproximity to major agriculture towns and also being the block headquarter. A Mandi zone is

proposed along the National Highway.

The planning area is adequately planned to prevent urban sprawl. The money invested in laying

infrastructure can be recovered from the revenue generated by tourism. Transit zone and mandi can

emerge as an instrument to drive economic growth.

Tourism zone is envisaged to be developed near the Nadaun Fort and Gurudwara Dasvin Patshahi

along Beas River. To provide for the incoming tourists, a hospitality zone is proposed at the centre

of the planning area. All the supporting facilities and amenities will be developed so that it caters to

the tourists.

8463

jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939

13.6 Development Pattern

A visit to Nadaun town reveals that ribbon development is in progress. It may lead to linear

development along with major roads if not planned, regulated and controlled now with statutory

means. There will be a tendency to construct shops, houses right up to the edge of the roads. Some

would even encroach upon the carriage ways. There shall also be a tendency to park vehicles along

roadsides. This shall turn these roads into long tunnels bounded by frequent bottlenecks. A road is

constructed at a huge cost and the society pays a big amount for its maintenance as well as its up-

keep. Laying of road in hill areas is not an easy affair. Therefore, it is imperative to induce future

development not along the main roads, rather away from them by way of sectoral development.

While town-level facilities have been worked out and marked on the Development plan, sites of

sector level facilities shall be specifically proposed at the time of preparing Sector Plans.

13.7 Strategies

(A)

Decongestion of Market Street of core town area

Development of market street precinct of core areas of Nadaun town in order to declutter

them for better pedestrian movement and accessibility through following strategies:

1. Heavy vehicles to be restricted during peak hours, which are primarily for loading and

unloading of goods and be allowed during non-peak/late hours. In case if

loading/unloading is required during peak hours, a systems of loading bays and non-

loading bays must be declared depending upon the high pedestrian traffic movement.

2. Provision of parking zones for 4 wheelers at various places with in range of 300 m

(walkable distance) from the dense area.

Figure 0-1: Development Proposals

NH – 3

NH

– 3

N

H

–

30

3

8464

jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939

3.

Provision of alternate routes for the through traffic to avoid unnecessary congestion.

4.

Segregation of vehicular and pedestrian movement/ circulation by separate pedestrian

walkways on the high-density roads eventually to comfort pedestrian movement and

avoid chaos due to 4 wheelers parked on road sides.

5.

Certain activities generating heavy vehicular traffic (ex. Vehicle repair shops, huge

whole sale stores) must be shifted away from the dense streets.

(B)

Prevention of unplanned Ribbon development

Ribbon development, which is considered as a negative outcome of urban sprawl is

prevalent in Nadaun especially towards the roads radiating out from the town core towards

south – west connecting Amb and south – east connecting Bilaspur. The unintended and

unplanned ribbon growth adjacent to NH-3 needs to be curbed and planned to accommodate

future possibilities by preparation of guideline and regulation for development along NH-3

by the authority to achieve following:

1.

Junctions generating conflicts between pedestrian and vehicular movement needs to be

identified and planned accordingly. Also, activities with large spill over needs to be

relocated from NH towards other low dense streets/roads.

2.

Road stretches where large no of public activities are opening directly on NH should

be provided with a service lane to cater the entrances opening directly on NH.

Alternatively, at these stretches parallel connecting roads to NH can be proposed

where the activities open on the inside roads to congestion on NH.

3.

Provide green buffer belt at the road stretches which are adjacent to agriculture land

and low density residential clusters to curb possibilities of future ribbon development.

4.

Junctions where the arterial roads are connecting the sub-arterial/ secondary road

(town or village road) must be taken special care to avoid conflict.

5.

Major entrances or roads opening/connecting to NH must be at a minimum distance of

300m from each other.

6.

(C)

Development of new urban area in Bela

In Nadaun Planning Area limit, the recent trends in urban sprawl shows that instead of

migration towards Nadaun town (municipal area) the villages are growing majorly within

themselves. The reasons are because of existing and upcoming major public facilities and

amenities.

Cricket stadium in Bela village is an attraction of such importance which is stimulating the

population growth. With certain other features in the surrounding the area is projected as another

centre of importance for urban growth. The following aspects must be considered in framing the

policy and guidelines for integrated development of the area.

1.

The cricket stadium must be developed with other indoor and outdoor sports facilities

to accommodate state level activities and events.

2.

Fort of Nadaun should be notified under list of heritage buildings of state and must be

developed for public use by conserving, restoring or proposing adaptive reuse of the

historical structure.

8465

jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939

3.

Proposed 6 lane road crossing through the area and bypassing Nadaun urban area is

improving the accessibility and connectivity of Bela area. This road stretches and its

junctions must be planned to avoid any future possibilities of ribbon development.

4.

River bed must be used for seasonal adventure water sports activities and is proposed

as start point of 16 km Long River rafting till Dhera Town Bridge.

5.

The recreational area on river edge.

6.

A district level botanical garden adjacent to the proposed road on the river edge must

be developed as part of integrated development of the region.

7.

A 50-100 m of buffer must be kept between the heritage structure and built

development as open and green area with permissible agriculture and recreational

facilities only.

8.

A river side walk way connecting heritage area with the cricket stadium could be

developed for recreation purposes with good public amenities and facilities.

(D) Development of Town level socio - cultural space

Bus stand currently situated in the core town area of Nadaun town is relocated at 700 m

away on NH towards south-west of Nadaun urban area. Its current location is in the urban

centre and lies at the junction which bifurcates the NH with various commercial and mixed-

use establishments. This combination of different activities and better connectivity makes it

feasible for public use of what.

Therefore, the existing bus stand site with hill top at Tillu Pratham adjacent to the main road

must be developed comprehensively for public facilities and recreation. The demarcated

sites can have activities like cinema hall, community hall, town hall, library, open garden,

food and snacks counters and seating kiosks. It can also have complimentary, appropriate

uses like utility and grocery shops, weekly haat etc. for common public use.

(E) Conservation of heritage and natural environment: Natural features in the form of forests

and rivers needs to be conserved. These large ecological greens can be developed for ecotourism.

Here a visit to fragile, pristine, and relatively undisturbed natural areas, intended as a low-impact

and often small-scale alternative to standard commercial (mass) tourism can be conducted.

Conserving the old heritage structure in the planning area and developing a tourist circuit. This will

also improve the economy of the local people.

(F) Provision for physical and social infrastructure: Provide basic infrastructure facilities to all.

Every household in urban area should have water supply and sewerage connection.

Health, education, security, recreational, social and cultural facilities to be distributed throughout

the town.

The development will provide housing and amenities for people and families of all cultures, ages

and incomes.

(G) Resolving Urban issues: Provision of more public spaces and proper utilization of land as it is

scarce resource in hilly areas. Problems of traffic congestion and parking is the most important

urban issue to be dealt with appropriately.

(H) Encourage economic activity:

The upcoming development intends to position itself as an economic engine and generate

employment. The light industrial, trade center, Mandi and promoting agriculture along with a

strong infrastructure base will attract new businesses and entrepreneurs to this development.

8466

jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939

(J) Developing Education hub: The development intends to offers a full range of educational

opportunities for citizens at every stage of their lives. Many schools, colleges and universities will

offer excellent, innovative academics and enhance the human capital of the settlement and region.

An educated, skilled and well-trained workforce will contribute to support the development as the

economic hub of the region and a major competitor for national and international enterprise and

industry.

(K) Affordable housing for all: A slum free town by rehabilitating and providing urban poor

housing.

13.8 Proposals and Recommendations

13.8.1 Housing

In order to cater for the requirements of housing for the anticipated population of 17501 persons in

the Planning Area by the year 2035, at the rate of 4.5 persons per family norm, nearly 3889 families

shall be residing in the planning area. Considering the present housing shortage of 311 dwelling

units, about 4200 dwelling units shall be required by the horizon period 2035. In view of present

trend of low residential density, at the rate of 75 persons per hectare, 104.83 hectares of additional

area is required to cater to the additional population of 7589. As 132.60 hectares area is existing,

therefore, the total developable area by 2035 would be 237.43 hectares including 2.37.hectares of

facilities and amenities.

In Nadaun Planning Area, as the residential development is envisaged to be primarily on the private

lands on one hand and acquisition being not preferred by the land owners, the onus of development

of residential areas vest with them. The land owners are to ensure either planned sub-divisions of

land or land pooling and reconstitution of the plots and accordingly development therein, ensuring

provision of convenient shopping, basic service infrastructure including water supply, sewerage

drainage, electric supply, road and other requisite facilities and services in view of creation of plots.

The owners may construct houses only for their own purpose without exhausting this process. The

housing areas are proposed to be developed by integrating future work areas and evolving

safeguards for forest areas. The proposed housing sectors/ clusters are proposed to be developed on

the neighbourhood principles of self-sufficiency by making provision of requisite infrastructure

therein. The concerned local body/Panchayat will be responsible for ensuring the implementation

of basic services and infrastructure at local level, by raising the resources through process of

undertaking remunerative schemes in the area on land to be got surrendered in its name during the

course of Land Pooling and Reconstitution mechanism. In case of bigger land parcels of vacant

land the same are to be developed by a development agency which has to play an effective role.

13.8.2 Trade and Commerce

The existing commercial area comprising of old bazaar (Pattan Bazaar) and the Main Bazaar and

will continue to function as such. Commercial activity in the developing new areas shall be allowed

in a planned manner only. Following proposals are being made with regard to trade and

commerce: -

9.

There is a need of wholesale and warehousing market (Mandi) for both Fruits and

Vegetable and Grains for the town. The same is being proposed over an area of 1.29

hectares at Jalari at the cross junction of NH-3 and MDR 36.

10. While the main bazaar shall continue to act as the Town Centre of Nadaun town. There

shall be sector-level or cluster level shopping in various sectors of the town. Such

shopping centres shall help ease off pressure on main bazaar. The following norms are

suggested for planning the above-mentioned shopping centres: -

8467

jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939

a)

Sector-level shopping centre-45 to 50 shops for a population of 5000 persons.

b)

Convenient shopping centre-10 to 15 shops for a population of 1000 persons.

11. In order to cater to the envisaged tourist population visiting Nadaun hotel and related

activity is proposed along NH-3.

Nadaun is a traditionally a trade and historic town. In view of increase in trading activities and

boost of tourism in the region, it is proposed to develop a commercial hub at in Tillu Pratham

village along the NH-3 and about 10 hotels shall be required to cater to the tourist population by the

year 2035. The land required for plot @ 350-400 sq.m. area per hotel which includes parking and

circulation area works out to 1.67 hectares. Beside this, an area of 1,84 hectares is required for

Retail Shopping Centre at Jalari, Kuthar and Tillu Khas villages. Thus, total requirement works out

to 8.70 hectares. As existing area under commercial use is 6.88 hectares, therefore, total additional

requirement works out to 1.82 hectares.

13.8.3 Mixed Use

Mixed land use zone has been proposed at strategic location along the NH-3 and NH-303. It

accounts of an area of 2.41 hectares within the planning area.

13.8.4 Industry

There are no industrial unit operating in the town presently. In order to cater for the requirements of

anticipated secondary work force of 893 workers, @ 115 sq.m. area per worker, an area of 10.27

hectares is required for Industry by the year 2035.

It is proposed to develop an industrial estate in Tillu Khas village along the proposed 24m wide by-

pass on about 10.27 Ha of available government land. Non-polluting and non-hazardous small-

scale or cottage industrial units are proposed in the industrial area viz., Handicraft industries, and

agro processing industries.

The existing flour mills as well as saw mills operating within residential buildings (if any) needs to

be shifted from their present location. No floor mill or saw mill shall be permitted within a

residential pocket.

13.8.5 Transportation

An area of 21.83 hectares is under the existing transportation network. Town level, inter-sectoral,

sectoral and cluster roads are required to be developed in the Planning Area.

With increase in traffic it is envisaged that present NH-3 and NH-303 will not be able to

accommodate traffic hence, it is proposed to increase the width of the present NH-3 and NH-303

from present 10 m ROW to 15 m ROW.

As most of the traffic entering Nadaun is E to E i.e., External to External, two by-passes have been

proposed one parallel to NH-3 and NH-303 traversing from the right bank of Beas river and

entering Bela near Nadaun Fort and then entering Tillu Khas village before meeting NH-3 at Jalari

and the other connecting old NH-70 (new NH-3) and old NH-88 (new NH-3) via Bharmoti Kalan at

Jalari. The NH-303 and NH-3 by-passes have been proposed with an ROW of 24 m and the other

by-pass of 15 m ROW.

Three junction improvements have been suggested one at present junction of NH-3 and NH-303

near the Bus stand, another at the junction of NH-3 and proposed By-pass in Bharmoti Kalan and at

the junction of NH-3 with the two proposed by-passes at Jalari.

8468

jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939

A truck terminal is proposed at the cross junction of the proposed by-pass and MDR-36 in Jalari

Saunkhlan. The truck terminal proposed on Government land measuring an area of about 0.62

hectares. The truck terminal has been strategically located in close vicinity of the proposed

Wholesale and Warehousing Centre (Mandi) located on the other side of the NH-3 in Jalari village

as the two activities are correlated and dependent on each other.

Figure 0-2: Proposed Transportation Facilities

The present bus terminal is in the heart of the town in the main market. As per the traffic

projections it is envisaged that the present bus terminal will not be able to accommodate the future

traffic volume of vehicles/people. Hence, a new bus terminal is proposed along NH-3 in an area of

about 0.56 hectares in Nagarada village.

A part from these, new roads of 6m and 9m and widening of important roads have also been

proposed in the planning area

To cater to the town level parking requirement, parking lots and taxi stand have been proposed at

various locations amounting to an area of 1.0 ha. Local level parking requirements of each land use

zone have to be met locally.

8469

jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939

13.8.6 Tourism

The development of tourism in and around Nadaun call for systematic and planned development,

check on encroachments, cleanliness of town, integration and systematic and planned marketing of

tourist destinations in surrounding areas, like Nadaun Fort and other heritage sites within the

planning area and provision of basic amenities at genuine rate.

In order to boost the tourism activity in the Planning Area it is proposed to repair and restore the

Nadaun fort, develop the adjoining area in to a tourist spot with landscaped gardens, pathways and

sitting arrangements. It is further proposed to conduct light and sound show to present the rich

history of the Nadaun Fort.

It is also proposed to develop other heritage sites within the planning area as tourist sites.

13.8.7 Public and Semi Public

An area of 11.33 hectares is existing under utilities, facilities and services. It is anticipated that an

area of 2.35 hectares will be required more for providing various facilities at Regional to Cluster

level in the Planning Area by the year 2035 as per the requirements. Refer Table 0-1.

Table 0-1: Area allocation for various facilities zone-wise

(lxix) Sr.

No.

(lxx)

Facilities

(lxxi) Area

(lxxii) (in Ha)

(lxxiii) 2

(lxxiv) Primary

School

(lxxv) 0.50

(lxxvi) 3

(lxxvii) Dispensary

(lxxviii)

0.05

(lxxix) 4

(lxxx) Family

Welfare Centre

(lxxxi) 0.15

(lxxxii) 7

(lxxxiii)

Sub Post

Office

(lxxxiv) 0.15

(lxxxv) 8

(lxxxvi) Police Post

(lxxxvii)

0.20

(lxxxviii)

9 (lxxxix) Police Station

(xc)

0.50

(xci)

10

(xcii) Fire Station

(xciii) 0.50

(xciv) 11

(xcv)

Banquet Hall

(xcvi) 0.15

(xcvii) 12

(xcviii) Community

Welfare Centre

(xcix) 0.15

(c)

(ci)

TOTAL

(cii)

2.35

Source: Estimated based on URDPFI Guidelines

A Water Treatment Plant has been proposed in Bela along the Beas River for which an area of 0.24

hectares have been provided.

13.8.8 Parks and Open Spaces Use

The town lacks in organised parks and open spaces. Local Parks are therefore, required to be

developed at cluster/sector level. At the rate of standard of 1.00 hectares per 1000 population, 17.50

hectares land is required to cater for population of the Planning Area by the year 2035. As 7.27

hectares area is existing, therefore, 18.92 hectares area is required more. It is proposed to develop

the old Nadaun Fort area into a tourist spot-cum-recreational area with landscaped gardens with

fountains, and conducting light and sound show within it.

About10 hectare land has also been earmarked for proposed Botanical and Zoological Park in Tillu

Khas village.

8470

jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939

13.8.9 Forest Areas

Nearly about 111.06 hectares of land falls under Demarcated Protected Forest use in Nadaun

Planning Area. This has been indicated in the existing land-use map as well as the proposed land-

use map. It is proposed to maintain and preserve all these forest areas. However, due to widening of

Tillu Khas road, the area under DPF has reduced to 109.38 hectares.

13.8.10Water Bodies Use

The land under Water Bodies i.e. 105.51 hectares shall remain without change in land use.

14

Land use

14.1 Introduction

The Existing land use of the Nadaun Planning Area was frozen under section -15A of the H.P.

Town and Country Planning Act, 1977 on 25.10.2016. The existing land use was prepared, notified

and adopted after considering public objections and suggestions. The present Planning Area

includes 11 revenue villages besides, Nadaun Nagar Panchayat.

14.2 Existing Land Use Plan

The existing land use plan has been prepared on the contoured Base Map provided by AGiSAC

(Aryabhatta Geo Informatics Space Application Centre), Department of Environment, Science and

Technology, Shimla. The Base Map has been prepared on World View-2 satellite image having

0.45 m resolution. After interpretation of land utilisation or land cover from the satellite imagery, a

predominant land use survey was conducted to identify the various land uses within the settlement

area.

The land use classification is specified in the URDPFI Guidelines have been adopted for the

planning area.

Of the total land in Nadaun Planning Area (897.39 Ha) only 132.60 Ha i.e., 14.77% is developed

and remaining 764.79 i.e., 85.22% in under developed. Of the total developed land, about 64.32%

is residential area while 5.18% of the land is under commercial use. Transportation which includes

road and other transportation facilities constitutes an area of 21.83 Ha i.e., about 16.47% of the

total developed area. The public and semi-public area and open green area in Nadaun Planning

Area account for nearly 8.55% and 5.48% of total developed area of Nadaun Planning Area.

Table 0-1 shows the land use distribution of Nadaun Planning Area, Nadaun Nagar Panchayat Area

and the land use distribution of developed area of the planning area.

The total Nadaun Planning Area has about 57.51% land under agriculture, 13.48% land under

forest which includes about 12.38% land under Demarcated Protected Forest and 1.10% under

Other Forest. River Beas along with this bank cover about 11.76% of the total area under Nadaun

Planning Area.

14.2.1 Residential Use

It comprises of 85.29 hectares area which works out to be 9.50 percent of the Planning Area. The

residential areas are generally occupied by two to three storied houses. The housing areas are

sprawling along the highways, around the old town, village abadis and in the agricultural fields.

8471

jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939

The old residential localities are along the old Bazar and old Bus Stand in the central area of Seri

and Kot Villages. The new extensions are coming up along the two National Highways particularly

in Bela village. The new SDM Colony has also come up in Village Bela. Residential use intermix

with the commercial use is a common phenomenon. Shops on ground floor on the road side and

remaining structure for residential purpose is a common sight.

Commercial Use

Most of the commercial establishments are located within the Pattan Bazaar, along NH-3 and NH-

303 and in the vicinity of the Main Market at the Bus stand

The commercial use consists of 6.88 hectares which is 0.77% of the Planning Area. The

construction of shops along roads emanating from town is a common phenomenon.

Temporary shops or khokas are located here and there, only a few organised shopping centre can be

seen on NH-303 in front of the Bus stand

Table 0-1: Land use Distribution, 2016

Co

de

Land use Category

Nadaun Planning Area

Developed

Area

Standa

rds (by

URDPF

I)

Area

(in

Ha)

Percentage of Total

Land

Area

(in

Ha)

Percent

age of

Develop

ed Land

1

Residential

85.29

9.50%

85.2

9

64.32%

50-55%

2

Commercial

6.88

0.77%

6.88

5.18%

2-3%

a

Retail shopping and General

Business

1.31

0.15%

b

Warehousing and Service

Sector

5.57

0.62%

3

Public and Semi Public

11.33

1.26%

11.3

3

8.55%

8-10%

a

Facilities and Amenities

11.01

1.23%

b

Utilities and Services

0.32

0.04%

4

Recreational

7.27

0.81%

7.27

5.48%

15-18%

a

Playground/ Stadium/

Sports Complex

5.23

0.58%

b

Parks & Gardens

0.74

0.08%

c

Multi-open Spaces

1.29

0.14%

5

Transportation

21.83

2.43%

21.8

3

16.47%

5-6%

a

Road

21.53

2.40%

b

Transportation Facilities

0.31

0.03%

6

Primary Activity

548.2

1

61.09%

a

Agriculture

516.0

7

57.51%

b

Plantation

22.30

2.49%

Forest

9.83

1.10%

8472

jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939

7

Protected and Undevelopable

Use

216.5

8

24.13%

a

Water Bodies

105.5

1

11.76%

b

Demarcated Protected

Forest

111.0

7

12.38%

TOTAL 897.3

9

100.00%

132.

60

100.00

%

Source: Land use Map based on Base Map prepared by AGiSAC

14.2.3 Public and S

emi-Public Use

Under Public and Semi-Public Use, facilities comprising of education, health, postal, police etc.

including government and semi-government offices occupy an area of 11.01 hectares. The utilities

including water supply, sewerage, electricity, telephone establishments and garbage disposal sites

comprise an area of 0.32 hectares. Thus, total existing land use under public and semi-public use is

11.33 hectares which is 1.26% of the total Planning Area.

14.2.4 Parks and Open Spaces

The organized Parks and Open Spaces are scarce and presently occupies an area of 7.27 hectares

which is negligible of the Planning Area. The citrus trees in the forests within and around the town

are in plenty and the same are serving as green lungs and areas for passive recreation. The town

enjoys unique environmental setting. The ground adjacent to the SDM office is the only space for

organizing cultural activities in the town.

Figure 0-1: Existing Land use Map of Nadaun Planning Area, 2016

Source: Based on Field Survey

NH – 3

NH

– 3

NH

–

303

8473

jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939

14.2.5 Traffic and Transportation Use

The major roads including National Highways and those emanating from the town as well as those

interlinking the different localities have an area of 21.53 hectares. The area under-transportation

facilities such as bus stand is 0.31 hectare, thus, total area under traffic and transportation use is

21.53 hectares, which is 2.43% of the total Planning Area.

14.2.6 Agriculture use

Agriculture land occupies 516.07 hectares which is 57.51% of the Planning Area. The agriculture

land. Apart from this, the planning area has land under plantations which account to 22.30 ha which

is 2.49% of the total land in the planning area.

14.2.7 Forest use

An area of 120.90 hectares is under the forest which is 13.48% of the Planning Area. The 120.90

hectares of land comprises of 111.07 hectares of Demarcated Protected Forest and 9.83 hectares of

other Forest areas.

Water Bodies Use

The area under water bodies primarily rivers, nallahs and Khad is 105.51 hectares which is 11.76

percent of the Planning Area.

14.3 Principles of Land Use Proposal

1.

All the public facilities and amenities as per URDPFI guidelines are majorly

demarcated on the government land and proposals are kept limited up to availability of

land under agriculture land use categories minimizing need for land acquisition.

2.

The development plan caters to the individual growth of the villages/growth centres

and is planned as per the needs of the immediate population by providing all basic

amenities and facilities.

3.

The urban growth by change in existing land use is proposed mostly under agriculture

land use category.

4.

To improve accessibility and to shift traffic from core areas in order to reduce

congestion, few roads are proposed majorly on agriculture land use.

14.4 Land Allocation Mechanism

Allocation of developable land for different uses to meet with the requirements for the next 20

years i.e. up to the year 2035 is made and proposed land-use structure devised accordingly.

Appropriate land uses have been proposed keeping in view the availability of developable land in

each sector, holding capacity in terms of population and activities, existing land use of the area,

development potentials, conformity of land use of its surrounding areas, threshold population for

facilities, locational attributes of amenities, site characteristics, convenient distance of work areas

from residential area, land values etc.

The growth of the 11 villages outside the Nagar Panchayat Area has been envisaged in the vicinity

of existing village settlement based on their projected population. The total additional land area for

development has been worked out based on the gross residential density as 75 pph which accounts

to 101.18 ha.

Out of 897.39 hectares of land within Planning Area, 237.43 hectares (26.46%) is proposed as

developable area whereas 659. 96 hectares of land (73.54%) has been retained as peri-urban area

comprises of Agriculture, Forest, and Water Bodies uses. The 135.90 hectares (15.14%) is

proposed for low density residential use. As the Government land is scarce almost entire

infrastructural development including roads, commercial activities, residential activities, has to take

8474

jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939

place on private land in accordance with population of the area, topographical conditions and

potentials and propensities of land. The land owners, however, resist for any sort of proposal for

community uses and compel the authorities to change the proposals. Approach of negotiated

proposals has, therefore, been envisaged in the Development Plan. Further detailing of proposals

will have to be done in accordance with prescribed zoning and sub-divisions regulations by the

local bodies in primarily built up areas, the Revenue Department and the development agency

through limited land acquisition, land pooling reconstitution mechanism involving land owners in

the new areas.

Uses pertaining to various economic activities like trade, commerce, tourism, industries and income

generating amenities if, segregated and provided separately in patches are unsustainability.

Similarly, facilities and services like schools, nursing homes, banks, telephone exchange and other

financial institutions also needs to be close proximity of the habitation. On the contrary,

Government and Semi-Government Offices, Postal Facilities, Police Service etc. are essentially

town level facilities which can be at a central location away from the habitation as well. The

Development Plan, therefore, addresses the central and local activities for town level/regional and

sectoral pursuits respectively. The related requirements thereof including parking, parks, open

spaces and circulation networks are to be detailed out in view of the local setting in accordance

with the prescribed zoning regulations.

14.5 Proposed Land use Classification

The land in the proposed Development Plan has been categorized into nine Land Use Zones:

Table 0-2: Proposed Land Use Classification, 2035

(ciii)

Sr.

No.

(civ)

Land use

Classification

(cv)

Land Use Sub-Classification

(cvi)

1

(cvii) Residential Use: R

(cviii) 1. Existing Residential: R1

(cix)

2. Proposed Residential: R2

(cx)

2

(cxi)

Commercial Use: C

(cxii) 1. Retail Shopping Zone and General

Business: C1

(cxiii) 2.Hospitality/ Hotels/ Lodges: C2

(cxiv) 3. Wholesale, Go-downs, Warehousing/

Regulated markets and Service Sector: C3

(cxv) 3

(cxvi) Mixed Use: M

(cxvii) -

(cxviii) 4

(cxix) Industrial Use: I

(cxx) -

(cxxi) 5

(cxxii) Public/Semi-Public

Use: PS

(cxxiii) 1. Govt./ Semi Govt. / Public Offices: PS

1

(cxxiv) 2. Educational and Institutional: PS 2

(cxxv) 3. Medical and Health Facilities and PS 3

(cxxvi) 4. Heritage and Socio-Cultural: PS 4

(cxxvii) 5.: Other Amenities/ Utilities and Services

PS 5

(cxxviii)

6 (cxxix) Recreational Use: R

(cxxx) 1. Playground/ Stadium / Sports Complex:

PS 1

(cxxxi) 2. Parks & Gardens: PS 2

(cxxxii) 3. Multi-Open Space (Maidan): PS 3

(cxxxiii)

7 (cxxxiv)

Transport Use: T

(cxxxv) 1. Road

(cxxxvi)

2. Railway

(cxxxvii)

3. Bus Deports/ Truck Terminals

(cxxxviii)

4. Parking-

8475

jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939

(cxxxix)

8 (cxl)

Primary Activity Use:

PA

(cxli) 1. Agriculture: PA 1

(cxlii) 2. Plantation: PA 2

(cxliii) 3. Forest: PA 3

(cxliv) 9

(cxlv) Protected

and

Undevelopable Use: E

(cxlvi) 1. Water bodies: E1

(cxlvii) 2. Protected Forest: E2

(cxlviii) 3. Green Belt/Buffer: E3

(cxlix) 4. Undevelopable use zone: E4

14.6 Proposed Land Use Plan

14.6.1 Residential Use

On the basis of residential density of 75 persons per hectare, an area of 135.90 hectares (15.14%)

has been proposed for the residential purpose. The residential areas are proposed to be developed in

and in the surroundings of the Nagar Panchayat Areas around the existing settlements. The

residential area accounts to 57.24% of the developable area. i.e., 237.43 hectares. The local

activities of cluster level enlisted in Chapter 8 such as nursery and primary schools, dispensaries,

parks, toilets etc. form an integral part of the residential areas and are to be detailed out during the

further course of preparation of Zonal, Sectoral Plans and Schemes.

14.6.2 Commercial Use

A total area of 8.70 hectares (0.97%) has been proposed for Commercial use. Most of the

commercial facilities have been proposed near the residential area in order to carter to the residing

population Other town level facilities viz., Wholesale and Warehousing activity (Mandi) and

Service Sector of 5.19 hectares has been proposed along the NH-3. Shopping centres are proposed

to be developed along with sizeable shops and requisite infrastructure, along the NH-3 in Tillu

Pratham village. Moreover, the Development Plan envisages to prepare improvement schemes for

the existing shopping centre to ensure improvement in environmental quality.

In order to carter to incoming tourist in the town, an area of 1.67 hectares (0.19%) has been

allocated. It includes the area require for boarding and lodging of future tourist traffic which may

come up within the Nadaun Planning Area along with other conforming land uses.

14.6.3 Mixed Land Use

As area of 2.41 hectares (0.27%) has been allocated for mixed use development at strategic

locations along the National Highway within the planning area.

14.6.4 Industry Use

As area of 10.27 hectares (1.14%) has been allocated for industrial development with the planning

area. It is proposed to accommodate agro based, horticulture and forest based industries apart from

handicraft and cottage industries in form of organized industrial area.

14.6.5 Public and Semi-Public Use

The Public and Semi-Public Use includes utilities, facilities, services, Government and Semi

Government offices and Institutions. The Utilities i.e. water supply, sewerage, drainage, electricity,

telephone establishments, garbage disposal etc. and Facilities like education, health, postal, police,

fire fighting, banking etc. besides Government and semi Government offices etc. have been given

due consideration for allocation of a land for this purpose in the Development plan. These

Institutions have extraneous influence zone beyond the immediate hinterland. These institutions are

proposed to be developed through their own mechanism by the respective authorities.

The existing land under public and semi-public facilities is 11.33 hectares and additional

requirement of 2.37 hectares is anticipated by providing utilities, facilities and services in. the

Planning Area by the year 2035. Accordingly, 13.70 hectares (1.53%) of land is proposed under

Public and Semi-Public use.

8476

jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939

14.6.6 Parks and Open Spaces Use

An area of 26.19 hectares (2.92%) has been proposed for organised parks and open spaces which

includes 10 hectares of Botanical and Zoological Park apart from organized green spaces such as

parks and playgrounds.

14.6.7 Traffic and Transportation Use:

As the town has grown around junctions of NH-3 and NH-303, there is a lot of regional traffic on

these narrow roads for which improvement in road network is proposed in the shape of bye-pass

road. Traffic and Transportation Use:

As the town has grown around junctions of NH-3 and NH-303, there is a lot of regional traffic on

these narrow roads for which improvement in road network is proposed in the shape of bye-pass

road.

The Development Plan envisages to provide parking lots on outskirts of the existing built up area to

meet with the requirements of increasing traffic volume on major entry points to already congested

town.

An area of 40.26 hectares (4.49%) has been proposed for Traffic and Transportation Use, out of

which 21.83 hectares is an existing area occupied by roads and parking spaces and 18.42 hectares is

additional requirement which includes 1.18 hectares of land for new bus terminal and truck

terminal. 1.00 hectares of land for taxi stand and parking and 16.28 hectares of area for proposed

by-passes and widening of existing roads.

14.6.8 Undevelopable Use

Undevelopable use zone shall be identified as all earthquake/landslide prone, cliffs and

environmentally hazardous area, areas adjacent to fault lines, areas with slope higher than 45

degree (NBC), flood plain and other areas identified by State Disaster Management Authority and

all the environmentally sensitive areas

Nadaun Planning Area has about 0.77 hectares of Undevelopable Area which accounts to 0.09% of

the total land.

8477

jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939

(cl)

(cli)

Figure 0-2: Proposed Land Use Plan

Table 0-3: Land use Distribution, 2035

Co

de

Land use Category

Nadaun

Planning Area

Developable

Area

Standar

ds

(by

URDPFI

)

Area

(in

Ha)

Percent

age of

Total

Land

Are

a

(in

Ha)

Percen

tage of

Total

Land

R

Residential

135.9

0

15.14%

135.

90

57.24

%

50-55%

R1

Existing Residential

83.29

9.28%

R2

Proposed Residential

52.60

5.86%

C

Commercial

8.70

0.97%

8.70

3.67%

2-3%

C1

Retail Shopping Zone and General

Business

1.84

0.21%

C2

Hospitality/ Hotels/ Lodges

1.67

0.19%

C3

Wholesale, Warehousing/ Regulated

markets and Service Sector

5.19

0.58%

8478

jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939

M

Mixed Land Use

2.41

0.27%

2.41

1.02%

I

Industry

10.27

1.14%

10.2

7

4.32%

3-4%

PS

Public and Semi Public

13.70

1.53%

13.7

0

5.77%

8-10%

PS

1

Govt./ Semi Govt. / Public Offices

4.45

0.50%

PS

2

Educational and Institutional

3.77

0.42%

PS

3

Medical and Health Facilities

0.99

0.11%

PS

4

Heritage and Socio-Cultural

0.88

0.10%

PS

5

Other Amenities/ Utilities and Services

3.62

0.40%

P

Recreational Green

26.19

2.92%

26.1

9

11.03

%

15-18%

P1

Playground/ Stadium/ Sports Complex

5.23

0.58%

P2

Parks & Gardens

19.40

2.16%

P3

Multi-open Spaces

1.56

0.17%

T

Transportation

40.26

4.49%

40.2

6

16.95

%

5-6%

T1

Road

37.81

4.24%

T2

Bus Depots/ Truck Terminals

1.18

0.13%

T3

Parking

0.06

0.01%

TS

Taxi Stand

0.94

0.10%

PA Primary Activity Use

431.4

9

48.08%

PA

1

Agriculture

408.9

7

45.57%

PA

2

Plantation

22.01

2.45%

PA

3

Forest

0.52

0.06%

E

Protected and Undevelopable Use

228.4

7

25.46%

E1

Water Bodies

105.5

1

11.66%

E2

Demarcated Protected Forest

109.3

8

12.19%

E3

Green Buffers

13.70

1.53%

E4

Undevelopable Area

0.77

0.09%

TOTAL

897.3

9

100.00

%

237.

43

100.00

%

Source: Estimated based on Proposed Land use

8479

jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939

15

Plan Implementation

15.1 Introduction

The Development Plan contains provision for a projected population of 17501 people which is

anticipated to reside in Nadaun Planning Area by the end of year 2035 through period of 20 years.

The total area covered within Nadaun Planning Area is 897.39 hectares. The 111.06 hectares of

land covered under DPF and 104.52 hectares under Water Bodies has been retained as such. An

acute shortage of funds for acquisition of land for public purposes is a great challenge to the

administration to ensure a sustainable integrated development pattern. Therefore it has been

proposed to adopt a people's participatory approach for an optimum accomplishment. It will only

be possible with the joint efforts of Nagar Panchayat and the Gram Panchayats included in the

Nadaun Planning Area and the Department of Town and Country Planning which is nodal agency

for planning in the State.

For the horizon year 2035, it is envisaged that about 101.18 ha of land is required for development

out of 897 ha of the Nadaun Planning Area. Though Phasing, costing and implementation of

Development Plan is to be contemplated by integrating it as part of Five Year Plans and keeping in

view development priorities to meet needs of growing population, yet in view of socio-economic

dynamics likely to persist after the course of five years on one hand and in consonance with the

national policy of preparation of rolling plans on the other. The programme for implementation of

each successive phase has to be worked out in view of reviewing at interval of 5 years’ time frame

i.e. after each phase. For implementation of Development Plan, necessary serviced land have to be

developed in view of planning provisions to the channelise growth of the town according to the

Development Plan. In implementation of this Development Plan, Nagar Panchayat Nadaun and

Gram Panchayats are proposed to play an instrumental role for bulk services, however, the State

Govt. has to make allocation either to the Department of Town and Country Planning or to

Infrastructural Departments.

15.2 Phasing

The Development Plan is a regulatory instrument to guide the development through horizon period

of 20 years. Since it is not possible to clearly foresee the entire scenario with reference to the

financial aspects that is likely to emerge over such a long period, therefore, the Development Plan

is considered to be a long-term policy document which is to serve as a guide for development and

must be reviewed after every five years to incorporate all the changes on priorities. The first phase

is very important as it gives lead to the development pattern that is to be followed in subsequent

phases.

To implement the proposals made in previous chapter in a phased manner, following phases have

been proposed: -

Phase I

2016-2021

Phase II

2021-2026

Phase III

2026-2031

Phase IV

2031-2035

8480

jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939

Details of activities to be undertaken in each phase is given in the table below:-

(clii)

Sr.

No.

(cliii) Activities/Use

(cliv) Pha

se I

(clv)

2016

-21

(clvi) Pha

se II

(clvii) 2021

-26

(clviii) Pha

se III

(clix) 2026

-31

(clx)

Pha

se IV

(clxi) 2031

-36

(clxii) 1

(clxiii) Commercial

(clxiv)

(clxv)

(clxvi)

(clxvii)

(clxviii) a (clxix) Re-vitalisation

of Pattan Bazaar

(clxx)

(clxxi)

(clxxii)

(clxxiii)

(clxxiv) b (clxxv) Wholesale

market/ware-

housing at Jalari

junction

(clxxvi)

(clxxvii)

(clxxviii)

(clxxix)

(clxxx) c (clxxxi) Revival

of

Sericulture Farms

(clxxxii)

(clxxxiii)

(clxxxiv)

(clxxxv)

(clxxxvi)

d (clxxxvii)

Hotels and

Restaurants

(clxxxviii)

(clxxxix)

(cxc)

(cxci)

(cxcii) e (cxciii) Service Sector -

Repair shops

(cxciv)

(cxcv)

(cxcvi)

(cxcvii)

(cxcviii)

2 (cxcix) Industrial

(cc)

(cci)

(ccii)

(cciii)

(cciv) a (ccv)

Handicraft

and

Cottage Industries

(ccvi)

(ccvii)

(ccviii)

(ccix)

(ccx)

b (ccxi) Agro-processing

Industries

(ccxii)

(ccxiii)

(ccxiv)

(ccxv)

(ccxvi) 3

(ccxvii) Traffic

and

Transportation

(ccxviii)

(ccxix)

(ccxx)

(ccxxi)

(ccxxii) a (ccxxiii)

24m

wide

Proposed new by-

pass

(ccxxiv)

(ccxxv)

(ccxxvi)

(ccxxvii)

(ccxxviii)

b (ccxxix)

15m

wide

NH-3 by pass via

Bharmoti Kalan

(ccxxx)

(ccxxxi)

(ccxxxii)

(ccxxxiii)

(ccxxxiv)

c (ccxxxv)

Widening

of existing NH to

15m

and

other

local roads

(ccxxxvi)

(ccxxxvii)

(ccxxxviii)

(ccxxxix)

(ccxl) d (ccxli) Junction

Improvements

(ccxlii)

(ccxliii)

(ccxliv)

(ccxlv)

(ccxlvi) e (ccxlvii)

Truck

Parking at Jalari

(ccxlviii)

(ccxlix)

(ccl)

(ccli)

(cclii) f (ccliii) Bus Terminal at

Nagarada

along

NH-3

(ccliv)

(cclv)

(cclvi)

(cclvii)

(cclviii) g (cclix) IPT System –

CNG Autos and

Electric

Rickshaws

(cclx)

(cclxi)

(cclxii)

(cclxiii)

(cclxiv) h (cclxv) Public Transport

System – Mudrika

Bus Sewa

(cclxvi)

(cclxvii)

(cclxviii)

(cclxix)

(cclxx) i (cclxxi) Relocation

of

Taxi stand

(cclxxii)

(cclxxiii)

(cclxxiv)

(cclxxv)

8481

jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939

(clii)

Sr.

No.

(cliii) Activities/Use

(cliv) Pha

se I

(clv)

2016

-21

(clvi) Pha

se II

(clvii) 2021

-26

(clviii) Pha

se III

(clix) 2026

-31

(clx)

Pha

se IV

(clxi) 2031

-36

(cclxxvi)

j (cclxxvii)

Parking lots

at

strategic

locations

(cclxxviii)

(cclxxix)

(cclxxx)

(cclxxxi)

(cclxxxii)

k (cclxxxiii)

Pedestrianis

ation

of

Pattan

Bazaar

(cclxxxiv)

(cclxxxv)

(cclxxxvi)

(cclxxxvii)

(cclxxxviii) l (cclxxxix)

Installation

of Flood light at

junctions

(ccxc)

(ccxci)

(ccxcii)

(ccxciii)

(ccxciv)

m (ccxcv) Installation

of

Traffic lights at

junctions

(ccxcvi)

(ccxcvii)

(ccxcviii)

(ccxcix)

(ccc)

n (ccci) Installation

of

Solar Street lights

(cccii)

(ccciii)

(ccciv)

(cccv)

(cccvi) 4

(cccvii) Tourism

(cccviii)

(cccix)

(cccx)

(cccxi)

(cccxii) a (cccxiii)

Developme

nt of Nadaun Fort

as

a

tourist

/

picnic spot

(cccxiv)

(cccxv)

(cccxvi)

(cccxvii)

(cccxviii)

b (cccxix)

Repair and

Restoration

of

Nadaun Fort

(cccxx)

(cccxxi)

(cccxxii)

(cccxxiii)

(cccxxiv)

c (cccxxv)

Light

and

sound

show

at

Nadaun Fort

(cccxxvi)

(cccxxvii)

(cccxxviii) (cccxxix)

(cccxxx)

d (cccxxxi)

Developme

nt

of

other

heritage sites

(cccxxxii)

(cccxxxiii)

(cccxxxiv)

(cccxxxv)

(cccxxxvi)

e (cccxxxvii) River

rafting

from

Dhera to Nadaun

(cccxxxviii) (cccxxxix)

(cccxl)

(cccxli)

(cccxlii)

f (cccxliii)

Camping

Sites

at

River

Beas

(cccxliv)

(cccxlv)

(cccxlvi)

(cccxlvii)

(cccxlviii)

5 (cccxlix)

Facilities

(cccl)

(cccli)

(ccclii)

(cccliii)

(cccliv) a (ccclv) Nursery

and

Primary Schools

(ccclvi)

(ccclvii)

(ccclviii)

(ccclix)

(ccclx) b (ccclxi) Establishment of

Kendriya

Vidyalaya

(ccclxii)

(ccclxiii)

(ccclxiv)

(ccclxv)

(ccclxvi)

c (ccclxvii)

Dispensary

(ccclxviii)

(ccclxix)

(ccclxx)

(ccclxxi)

(ccclxxii)

d (ccclxxiii)

Nursing

Home and Family

Welfare Centre

(ccclxxiv)

(ccclxxv)

(ccclxxvi)

(ccclxxvii)

(ccclxxviii) e (ccclxxix)

Post Office

(ccclxxx)

(ccclxxxi)

(ccclxxxii) (ccclxxxiii)

(ccclxxxiv) f (ccclxxxv)

Police Post

/ Station

(ccclxxxvi) (ccclxxxvii) (ccclxxxviii)

(ccclxxxix)

8482

jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939

(clii)

Sr.

No.

(cliii) Activities/Use

(cliv) Pha

se I

(clv)

2016

-21

(clvi) Pha

se II

(clvii) 2021

-26

(clviii) Pha

se III

(clix) 2026

-31

(clx)

Pha

se IV

(clxi) 2031

-36

(cccxc) g (cccxci) Fire Station

(cccxcii)

(cccxciii)

(cccxciv)

(cccxcv)

(cccxcvi)

h (cccxcvii)

Banquet

Hall

(cccxcviii)

(cccxcix)

(cd)

(cdi)

(cdii) i (cdiii) Mini-Secretariat

at Inderpal Chowk

(cdiv)

(cdv)

(cdvi)

(cdvii)

(cdviii) 6

(cdix) Utilities

(cdx)

(cdxi)

(cdxii)

(cdxiii)

(cdxiv) a (cdxv) Public Drinking

Water Coolers/ Water

ATM

(cdxvi)

(cdxvii)

(cdxviii)

(cdxix)

(cdxx) b (cdxxi) Public Toilets at

strategic locations

(cdxxii)

(cdxxiii)

(cdxxiv)

(cdxxv)

(cdxxvi)

c (cdxxvii)

Channelisat

ion of Man Khad and

Nallahs

(cdxxviii)

(cdxxix)

(cdxxx)

(cdxxxi)

(cdxxxii)

d (cdxxxiii)

Waste

to

Compost Plant

(cdxxxiv)

(cdxxxv)

(cdxxxvi)

(cdxxxvii)

(cdxxxviii) 7 (cdxxxix)

Recreation

al Spaces

(cdxl)

(cdxli)

(cdxlii)

(cdxliii)

(cdxliv) a (cdxlv) Cluster/

Neighbourhood Parks

(cdxlvi)

(cdxlvii)

(cdxlviii)

(cdxlix)

(cdl)

b (cdli) City

Park

at

SDM Office

(cdlii)

(cdliii)

(cdliv)

(cdlv)

(cdlvi) c (cdlvii) Development of

Kharidi Ground in to a

park

(cdlviii)

(cdlix)

(cdlx)

(cdlxi)

(cdlxii) d (cdlxiii) Development of

Ramlila Ground

(cdlxiv)

(cdlxv)

(cdlxvi)

(cdlxvii)

(cdlxviii)

e (cdlxix) Swimming Pools

(cdlxx)

(cdlxxi)

(cdlxxii)

(cdlxxiii)

(cdlxxiv)

f (cdlxxv)

Botanical

Garden

(cdlxxvi)

(cdlxxvii)

(cdlxxviii)

(cdlxxix)

(cdlxxx)

g (cdlxxxi)

Zoological

Garden

(cdlxxxii)

(cdlxxxiii)

(cdlxxxiv)

(cdlxxxv)

(cdlxxxvi)

7 (cdlxxxvii) Residential

(cdlxxxviii)

(cdlxxxix)

(cdxc)

(cdxci)

(cdxcii) a (cdxciii)

Residential

Sectoral Development

(cdxciv)

(cdxcv)

(cdxcvi)

(cdxcvii)

(cdxcviii)

8 (cdxcix)

Infrastruct

ure

(d)

(di)

(dii)

(diii)

(div)

a (dv)

Water supply

(dvi)

(dvii)

(dviii)

(dix)

(dx)

b (dxi)

Sewerage

(dxii)

(dxiii)

(dxiv)

(dxv)

(dxvi) c (dxvii) Strom

water

drains

(dxviii)

(dxix)

(dxx)

(dxxi)

(dxxii) d (dxxiii) Solid

Waste

Management

(dxxiv)

(dxxv)

(dxxvi)

(dxxvii)

(dxxviii)

e (dxxix) Power

(dxxx)

(dxxxi)

(dxxxii)

(dxxxiii)

(dxxxiv)

f (dxxxv) Telecommunicat

ion

(dxxxvi)

(dxxxvii)

(dxxxviii)

(dxxxix)

8483

jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939

15.3 Costing

The Plan envisages that the residential development is to be ensured by the land owners by sub-

divisions and Nagar Panchayat and Gram Panchayats through mechanism of 'Land Pooling and

Reconstitution'. In case the "Land Pooling and Reconstitution" mechanism does not succeed, then

land has to be acquired for implementation of the Development Plan Roads with width 6.00 metres

and less will be developed by Nagar Panchayats and Gram Panchayat by raising funds from the

beneficiaries. Roads with a width of 9.00 metres, 12.00 metres and 15.00 metres will be

implemented by the PWD by raising development charges through implementation and realization

of remunerative uses in the activity zones. However, the cost of arterial roads (18.00 metres)

including bye passes, bulk water and electric supply will be borne by obtaining funds through plan

allocation from the State Government and the same will be realized subsequently from the

beneficiaries.

The cost of various infrastructure projects envisaged in the Development Plan accounts of about

291 crores.

This includes:

Construction of new roads and road widening on proposed roads. Construction of storm-

water drains along the roads.

Construction of Water Treatment Plan and laying of water supply distribution network

Construction of Sewerage Treatment Plant and laying of sewer network

Augmentation of existing electric sub-station and laying of over-head electrical lines

Street-lighting and telecommunication networking

Solid waste management

The costing neither include land acquisition cost nor cost of construction of building. It is only cost

of infrastructural works which would have to be borne by the developing agency

Table 0-1: Summary of Infrastructure Cost

S.

No.

Description

Uni

t

Rate

Total

Quantity

Total

Amount

1

ROADS and PATHWAY

1A Asphalt Carriage Way

300mm GSB, 250mm WMM, 100mm DBM,

40mm BC

Sq.

m.

3,300

145142.62

47,89,70,6

46

SUB HEAD TOTAL

47,89,70,6

46

2

STORM WATER DRAINAGE

2A Rectangular Drains (RCC)

Met

er

21,000

60719.00

1,27,50,99,

000

2B Culverts (RCC) Big

Met

er

70,00,00

0

4.00

2,80,00,00

0

2C Culverts (RCC) Road Crossings

Eac

h

65,000

31.00

20,15,000

SUB HEAD TOTAL

1,30,51,14,

000

3

WATER SUPPLY

3A Potable Water Supply Distribution Network

HDPE PE80 <300mmdia, 300mm>DI Pipes,

Met

er

3,500

17926.04

6,27,41,14

0

8484

jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939

S.

No.

Description

Uni

t

Rate

Total

Quantity

Total

Amount

SandS K-7

3B WTP

ML

D

3,00,00,

000

1.20

3,60,00,00

0

SUB HEAD TOTAL

9,87,41,14

0

4

SEWERAGE

4A Waste Water network

RCC NP-3 internal lined pipes

Met

er

5,750

17926.04

10,30,74,7

30

4B STP

ML

D

3,50,00,

000

0.50

1,75,00,00

0

SUB HEAD TOTAL

12,05,74,7

30

5

Solid Waste Management

TP

D

3,00,000

1000.00

30,00,00,0

00

6

Power and Telecommunications

6A Augmentation of Gagaal Sub Station

33/11kV

L.S

3,50,00,

000

1.00

3,50,00,00

0

6B New 11kV OH Network

KM

6,02,557

24.05

1,44,91,50

7

6C L.V Network with Pole Mounted Distribution

Transformers

KM

9,18,298

37.05

3,40,22,95

1

6D Street lighting on the existing OH

Infrastructure

KM

5,00,000

32.05

1,60,25,00

0

6E Telecommunications / Data Network

Conduiting

KM

2,50,000

15.00

37,50,000

SUB HEAD TOTAL

10,32,89,4

58

TOTAL

2,40,66,89,

974

Add for Misc. and unforeseen items

5%

12,03,34,4

99

Escalation (per annum)

7%

17,68,91,7

13

TOTAL (cost as on 2016)

2,91,04,95,

102

Source: Estimation based on HP Schedule of Rates, PWD

The phase wise costing for the infrastructural work is presented in the table below. The detailed

costing for infrastructure works envisaged in Development Plan is presented in Annexure 4 based

on HP Schedule of Rates, PWD.

Table 0-2: Phase-wise costing

S.

N

o.

Description

PH-1: 2016-

2021

PH-2:

2021-2026

PH-3:

2026-2031

PH-4:

2031-2035

Total

Amou

nt

Qu

anti

ty

Amou

nt

Qua

ntit

y

Amo

unt

Qua

ntity

Amo

unt

Qua

ntit

y

Amo

unt

1

ROADS and

PATHWAY

8485

jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939

1

A

Asphalt Carriage Way

300mm GSB, 250mm

WMM, 100mm DBM,

40mm BC

761

55.

10

25,13,

11,83

0

206

94

6,82,

90,99

2

14

45

4

4,76,

99,42

1

338

39

11,16

,68,4

03

47,89,

70,64

6

SUB HEAD TOTAL

25,13,

11,83

0

6,82,

90,99

2

4,76,

99,42

1

11,16

,68,4

03

47,89,

70,64

6

2

STORM WATER

DRAINAGE

3

A

Rectangular Drains (RCC)

226

13.

00

47,48,

73,00

0

110

21.

00

23,14

,41,0

00

96

03.

00

20,16

,63,0

00

174

82.

00

36,71

,22,0

00

1,27,5

0,99,0

00

3

B

Culverts (RCC) Big

1.0

0

70,00,

000

1

70,00

,000

1

70,00

,000

1

70,00

,000

2,80,0

0,000

3

C

Culverts (RCC) Road

Crossings

11.

00

7,15,0

00

6.0

0

3,90,

000

5.0

0

3,25,

000

9.0

0

5,85,

000

20,15,

000

SUB HEAD TOTAL

48,25,

88,00

0

23,88

,31,0

00

20,89

,88,0

00

37,47

,07,0

00

1,30,5

1,14,0

00

4

WATER SUPPLY

4

A

Potable Water Supply

Distribution Network

HDPE PE80 <300mmdia,

300mm>DI Pipes, S&S

K-7

904

9.1

2

3,16,7

1,920

197

7.8

8

69,22

,580

20

64.

91

72,27

,185

483

4.1

3

1,69,

19,45

5

6,27,4

1,140

4

B

WTP

0.6

1,80,

00,00

0

0.6

1,80,

00,00

0

3,60,0

0,000

SUB HEAD TOTAL

3,16,7

1,920

2,49,

22,58

0

72,27

,185

3,49,

19,45

5

9,87,4

1,140

5

SEWERAGE

5

A

Waste Water network

RCC NP-3 internal lined

pipes

904

9.1

2

5,20,3

2,440

197

7.8

8

1,13,

72,81

0

20

64.

91

1,18,

73,23

3

483

4.1

3

2,77,

96,24

8

10,30,

74,73

0

5

B

STP

0.5

1,75,

00,00

0

1,75,0

0,000

SUB HEAD TOTAL

5,20,3

2,440

1,13,

72,81

0

1,18,

73,23

3

4,52,

96,24

8

12,05,

74,73

0

6

Solid Waste

Management

100

0.0

0

30,00,

00,00

0

30,00,

00,00

0

6

Power and

Telecommunications

6

A

Augmentation of Gagaal

Sub Station 33/11kV

1

3,50,

00,00

0

3,50,0

0,000

6

B

New 11kV OH Network

12.

025

72,45,

754

12.

02

72,45

,754

1,44,9

1,507

8486

jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939

5

6

C

L.V Network with Pole

mounted Distribution

Transformers

18.

52

5

1,70,

11,47

6

18.

525

1,70,

11,47

6

3,40,2

2,951

6

D

Street lighting on the

existing OH Infrastructure

32.

05

1,60,2

5,000

1,60,2

5,000

6

E

Telecommunications /

Data Network Conduiting

15

37,50

,000

37,50,

000

SUB HEAD TOTAL

2,32,7

0,754

3,50,

00,00

0

2,42,

57,22

9

2,07,

61,47

6

10,32,

89,45

8

TOTAL

1,14,0

8,74,9

44

37,84

,17,3

82

30,00

,45,0

68

58,73

,52,5

81

2,40,6

6,89,9

74

Add for Misc. and

unforeseen items

5,70,4

3,747

1,89,

20,86

9

1,50,

02,25

3

2,93,

67,62

9

12,03,

34,49

9

Escalation (per annum)

8,38,5

4,308

2,78,

13,67

8

2,20,

53,31

2

4,31,

70,41

5

17,68,

91,71

3

TOTAL (cost as on

2016)

1,32,8

3,14,5

06

49,51

,51,9

29

38,56

,15,0

91

70,14

,13,5

76

2,91,0

4,95,1

02

Source: Estimated based on HP Schedule of Rates, PWD

15.4 Financing

The cost of residential development including road network, sewerage, drainage, electrification,

parks, open spaces, parking, local convenient shopping etc., is to be borne by the land owners either

themselves in respect of their land holdings or by way of land pooling and reconstitution

mechanism in respect of small irregular holdings of different owners. The benefits likely to occur

by way of sale of plots by virtue of enhancement of land values due to planned efforts would be

more than sufficient to meet with the cost of development. On the basis of demarcation of plots in

view of duly approved sub-division land pooling and reconstitution scheme by the Director, Town

and Country Planning Department. Himachal Pradesh. The land owner may get advance from the

likely purchasers for development purposes.

The two-organized commercial complex on 2.00 hectares of land are to be developed by the Nagar

Panchayat/Cooperative Societies.

The Wholesale warehouse complex on 0.50 hectares is to be developed by the HP Marketing

Committee.

The Truck parking in vicinity of the proposed Mandi is to be developed by the Nagar

Panchayat/Gram Panchayat/PWD by raising funds from the beneficiaries in due course of time, by

charged parking.

The HP Department of Industries/HP State Industrial Development Corporation will be responsible

for development of industrial area.

8487

jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939

Similarly, the respective Departments/ Government undertaking by raising resources from the

beneficiaries will be responsible for development of utilities, facilities and services including water

supply, sewerage, drainage electrification, telephone etc. at the town level.

The Government and Semi-Govt. offices are to be developed by the respective Departments either

by raising their own resources or by obtaining funds from the Government.

Town and sector level parks may be developed by the Nagar Panchayat and Gram Panchayat by

arranging land for the purpose.

15.5 Implementation

Besides landowners, Nagar Panchayat, and Gram Panchayats shall be responsible for creation of

services land. However, overall control on implementation of proposals of Development Plan in

terms of land use, zoning and sub-division regulations shall vest with the Director, Town and

Country Planning Department, Himachal Pradesh. To assess achievements of each phase and to

orient the Development Plan according to changing needs as well as to cater for unforeseen factors,

it is envisaged to review this Plan after the completion of period of each phase.

In order to ensure inter-departmental coordination, a committee under the chairmanship of SDM,

Nadaun is hereby recommended. It shall have following members:

1. S.D.M, Nadaun, Chairman

2. Tehsildar, Nadaun

3. Executive Engineer (B&R), H.P.PWD, Nadaun

4. Executive Engineer (I&PH), Nadaun

5. Executive Engineer (HPSEB), Nadaun

6. DFO, Nadaun

7. Pradhan, Nagar Panchayat, Nadaun

8. Executive Officer, MC, Nadaun

9. Regional Manager, HRTC, Hamirpur

10. Pradhans, Gram Panchayats in Nadaun Planning Area

11. Executive Engineer (NH)

12. Three Key NGO’s or public representatives

13. Town and Country Planner, Hamirpur Member Secretary

The Committee may meet at least twice in a year and devise ways and means to ensure

implementation of development plan proposals.

16

General Development Regulation, Building By-Laws and Procedure of Plan Sanction

16.1 Objective of Development Regulation and Building By-Laws

Regulations/Building Bye Laws are legal tools for development control used to regulate ground

coverage, height, architectural design and construction aspects of buildings to achieve orderly

development of an area. They are statutory in nature and serve to protect buildings against fire,

earth quake, noise, structural failures and other hazards. They also safeguard appropriate indoor

environment for inhabitants with natural light & ventilation. Regulations/Building Bye Laws also

helps to avoid encroachments and protect the road right of way.

8488

jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939

All mandatory regulations w.r.t. Development Plan/ Development Control Regulations regarding

use, coverage, FAR, set-backs, open spaces, height, number of stories, number of dwelling units,

parking standards etc., for various categories of buildings, including modifications therein, made

from time to time, shall be applicable mutatis-mutandis in the Building Regulations as well. All

amendments/ modifications made in these Regulations will automatically be included as part of the

Development Control Regulations.

16.2 Jurisdiction of Regulations

These Regulations shall apply to the sub-division of land and building activities in the Nadaun

Planning Area. The detail of Revenue Villages falling in Nadaun Planning Area is as under:

16.3 Applicability of Regulations

Except hereinafter or otherwise provided, these Regulations shall apply to:-

i.

all new development and re-development of a plot,

ii.

sub-division of land,

iii.

erection and/or re-erection of a building

iv.

and all building activities.

These Regulations shall be read in conjunction with the Himachal Pradesh Town and Country

Planning Act, 1977 and the Himachal Pradesh Town and Country Planning Rules, 2014 as

amended from time to time and shall be applicable for a period for which this Development Plan

has been prepared, after which these shall be reviewed. Till such time the reviewed Regulations are

notified, these will continue to be in force.

16.3.1 New Development and Re-development

Redevelopment is replacement of the existing built-up environment and enable co-creation of a

new layout with enhanced infrastructure and increased density. These Regulations applies to the

design, construction or re-construction and additions and alterations of new & existing buildings

within the plot.

Sr.

No.

Name of the Revenue Village

Hadbast

No.

Area (in

Hectares)

Population

2011

1.

Nagarada (Nagar Panchayat)

18/20

72.84

4430

2.

Kot (Nagar Panchayat)

18/21

74.00

3.

Dolee Gharan (Nagar Panchayat)

18/22

23.15

4.

Seri (Nagar Panchayat)

19

61.48

5.

DPF Kuthar

18

31.14

-

6.

Kuthar

18/24

45.83

356

7.

Bharmoti Kalan

18/25

98.65

526

8.

Jalari Saunkhlan

19/32

28.40

494

9.

Harmandir Mandiala

19/35

57.60

458

10

Harmandir Rukwalan (Partially)

19/37

5.06

20

11

Bela

19/38

193.94

2347

12

DPF Tillu

19/39

87.10

46

13

Tillu Pratham

19/39

13.32

335

14

Tillu Khas

19/39

72.96

649

15

Gagaal

19/40

31.92

251

Total

897.39

9912

Table 0-1: Components of Nadaun Planning Area

8489

jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939

16.3.2 Part Construction

In case of part construction, where the whole or part of a building is demolished or altered or re-

constructed, except where otherwise specifically stipulated, these Regulations shall apply only to

the extent of the work involved.

16.3.3 Re-construction

The re-construction in whole or part of a building which has ceased to operate due to fire, natural

collapse or demolition having been declared unsafe, or which is likely to be demolished, as the case

may be, these Regulations shall apply.

16.3.4 Existing approved buildings

Nothing in these Regulations shall require the removal, alteration or abandonment, nor prevent

continuance of the lawfully established use or occupancy of an existing approved building unless,

in the opinion of the Competent Authority, such a building is unsafe or constitutes a hazard to the

safety of adjacent property or to the occupants of the building itself.

16.4 Development Permission

Development or re-development shall carry out including sub-division on any plot or land (not

forming part of any approved layout plan or scheme) after obtaining approval for the layout plan

from the Competent Authority only.

15.5 Building Permission

16.5.1 Building Permission

Any person intending to erect, re-erect or make addition/ alterations in any building or cause the

same to be done shall first obtain appropriate building permission for each such building from the

Competent Authority.

The following item of works are exempted from the above Regulation:

(i) Plastering/cladding and patch repairs, except for the Heritage Buildings where

Heritage Conservation Committee’s permission is required.

(ii) Re-roofing or renewal of roof including roof of intermediate floor at the same height.

(iii) Flooring and re- flooring.

(iv) Opening windows, ventilators and doors opening within the owners plot.

(v) Rehabilitation/repair of fallen bricks, stones, pillars, beams etc.

(vi) Construction or re- construction of sunshade not more than 0.75 Metre in width within

one’s own land and not overhanging over a public street.

(vii) Construction or re-construction of parapet and also construction or reconstruction of

boundary walls as permissible under Bye Laws.

(viii)White washing, painting etc. including erection of false ceiling in any floor at the

permissible clear height provided the false ceiling in no way can be put to use as a loft

/mezzanine floor etc.

8490

jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939

(ix) Reconstruction of portions of buildings damaged by storm, rains, fire, earthquake or

any other natural calamity to the same extent as existed prior to the damage as per

sanctioned plan, provided the use conforms to provisions of Development Plan.

(x) Erection or re-erection of internal partitions provided the same are within the preview

of the Bye-laws.

(xi) For erection of Lifts in existing buildings unless it does not affect the free movement.

(xii) Change/ Installation/ re-arranging/ relocating of fixtures or equipments without

hindering other’s property/ public property shall be permitted.

(xiii)Landscaping

(xiv) Toilet/Washroom, Security Room, up to a maximum area of 9.00 M2 only (permitted

within setback area, provided it does not obstruct fire vehicles movement) in plot more

than 3000 M2.

(xv) A Porta cabin up to 4.50 M2 permitted within setback area, provided it does not

obstruct fire vehicles movement.

16.5.2 Grant, Refusal and Deemed to be Sanctioned

If within the time limit stipulated in the Himachal Pradesh Town and Country Planning Act, 1977

as amended from time to time for various categories of buildings specified therein or the

Competent Authority fails to intimate in writing to the person, who has applied for permission of its

refusal or sanction or any intimation, the application with its plans and statements shall be deemed

to have been sanctioned;

Provided that the fact is immediately brought to the notice of the Competent Authority in writing

by the person; and

Subject to the conditions mentioned in these Bye-laws, nothing shall be constructed to authorize

any person to do anything in contravention or against the terms of lease or titles of the land or

against any other Regulations, Bye-laws or Ordinance operating on the site of the work.

In case the Competent Authority rejects the application due to any reasons, the applicant can re-

submit the building plan along with fees and with compliances.

16.6 Already permitted buildings

Building permission issued by the Competent Authority before these Regulations come in to effect

and where construction is in progress and has not been completed within the specified period from

the date of such permission, the said permission shall be deemed to be valid and shall only be

eligible for re-validation thereunder. Accordingly, where the validity of permission has expired,

such construction shall be governed by the provisions of these Regulations. If the validity of

permission has not expired and construction has not being started such applicants may revise the

layout plan as per these regulations.

8491

jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939

16.7 Procedure for obtaining Planning/Building Permission

16.7.1 Application

The application for development of land to be undertaken on behalf of the Union or State

Government under Section 28 and under Section 29 by a Local Authority or any Authority

specially constituted under the Himachal Pradesh Town and Country Planning Act, 1977 as

amended from time to time shall be accompanied by such documents as prescribed under Rule- 14

of the Himachal Pradesh Town and Country Planning Rules, 2014. The application for

development of land to be undertaken under Section 30 by any person not being the Union or State

Government, Local Authority or any Authority specially constituted under the Himachal Pradesh

Town and Country Planning Act, 1977 as amended from time to time shall be in such Form along

with the Specifications Sheet and Schedule attached with these Forms and containing such

documents and with such fee as prescribed under Rule 16 of the Himachal Pradesh Town and

Country Planning Rules, 2014.

All the applications shall be made online. The procedure documents to be submitted online shall be

as prescribed in the Himachal Pradesh Town and Country Planning web portal i.e.,

http://tcp.hp.gov.in

16.7.2 Documents Required

Apart from above, the applicant shall furnish the following additional documents namely:

16.7.2.1 Administrative Documents:

1.

A copy of Ownership documents, i.e. latest original Jamabandi.

2.

Latest original Tatima showing Khasra number of land in question, adjoining Khasra

numbers from all sides of plot and width of the approach path/road. The land applied

for shall be shown in red, in the Tatima.

3.

Copy of Treasury Challan Form vide which requisite fee has been deposited.

4.

To avail any compensatory benefits due to land acquisition for any public

infrastructure a certificate from the Nagar Panchayat or Gram Panchayat or Competent

Authority as the case may be, shall be enclosed in support of claim for compensatory

benefits.

16.7.2.2 Technical Documents:

1.

Location Plan in the Scale of 1:1000, with North direction indicating the land in question,

main approach roads, important physical features of the locality/area, important public

buildings like School, Hospital, Cinema, Petrol Pump etc. and surrounding ownership.

2.

Site Plan in the scale of 1:200 with North direction indicating the proposed site, approach

road, adjoining buildings, the existing and proposed utility infrastructure such as drainage

and sewerage, water supply and power including the built-up area and open area clearly.

Site must tally with the shape and dimensions of plot shown in the Tatima.

3.

Building Plan showing floor plans, elevations and sections in the scale of 1: 100. The

architectural drawings duly signed by the private professionals registered under Appendix-

10 of Himachal Pradesh Town and Country Planning Rules 2014 as amended from time to

time.

8492

jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939

4.

Recommended notation for colouring of plans: The site and building plans shall be coloured

as specified in the table given below. Where items of work are not identified, the colouring

notation used shall be indexed

Table 0-2: Colouring of Plans

Sr.

No.

Item

Site/ Building Plan

1.

Plot lines

Yellow

2.

Road/ Street/ Path

Black

3.

Proposed building line

Red

4.

Existing work (Outline)

Green

5.

Work proposed to be demolished

Orange

6.

Sewerage

Dark Brown

7.

Water Supply/ RWH System

Sky Blue

8.

Drainage

Dark Blue

5.

In the Site Plan, the horizontal distance of electricity line, from development as per Indian

Electricity Rules, in case any electricity line is passing over or nearby the proposed site

shall be shown.

6.

A certificate from the Nagar Panchayat or Gram Panchayat or Competent Authority, as the

case may be, shall be enclosed to claim compensatory benefit in support of taking over the

land surrendered for development of road/ path/ public facility or amenities/ infrastructure.

The land surrendered for development of Public Street/ Facility/ Infrastructure shall be

registered by the Revenue Authority as Public Purpose. Provided that the applicant shall be

compensated by allowing the Floor Area Ratio (FAR) on the surrendered land for public

purpose.

Note- Total plot area shall also include the area surrendered for public purpose so that applicant

shall not lose the FAR for any land surrendered in public interest by utilising that FAR on

the remaining land.

7.

The structural stability certificate and soil investigation report shall be submitted by the

applicant on submission of planning permission case and at the time of completion of

structure and before occupancy duly singed by the registered Structural Engineer as per

Form -15 of the Himachal Pradesh Town and Country Planning Rules 2014 as amended

from time to time.

8.

The applicants shall not be insisted for submission of No Objection Certificate (NOC) from

National Highway Authority of India (NHAI) or Himachal Pradesh Public Works

Department (HPPWD) authorities. However, the Competent Authority shall ensure and

coordinate with other related Authorities that building is sanctioned strictly as per the

Regulations and facilitate single window clearance to the applicant. Applicant will submit

his layout plan with clearly demarcated, acquired and controlled width etc.

16.8 General Regulations

The following General Regulations shall apply to all development activities in the Nadaun Planning

Area: -

8493

jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939

1.

Maximum cutting of the natural ground profile shall not exceed more 3.50 Metre. However,

in extra ordinary cases where hill cut or excavation is more than 3.50 meter site

development Plan showing retaining/ breast wall etc. would be prepared/ designed by the

Structural Engineer.

2.

Maximum acceptable slope for development shall be 45 degrees.

3.

Construction should be allowed on sandwiched plots without any kind of setbacks but

projection shall not be allowed over the streets/roads.

4.

Sky view impression on the ground should be such that nothing including projections and

appendages such as AC outdoor units/sign bards etc. should project on the streets/ roads/

others' land.

5.

Water, sludge and sewage should also not trickle on the streets or roads. Septic Tank and

provision to lay out sewerage service line or connecting with the existing sewerage lines

shall be mandatory.

6.

The height of the room for human habitation shall not be less than 2.75 Metres measured

from the surface of the floor to the soffit of the slab, provided that the minimum headway

under any beam shall not be less than 2.40 Metres.

7.

No boundary wall, fence and hedge along any yard or plot shall exceed 1.50 Metre in

height.

8.

On a corner plot bounded by a vehicular road in any land use zone or area, nothing shall be

erected, placed, planted or allowed to grow in such a manner so as to materially impede

vision to avoid accidents and smooth running of vehicular traffic.

9.

No construction shall be allowed within 5.00 Metre distance from the existing forest or

green belt boundary.

10.

Minimum building width of 5.0 Metre be ensured after leaving setbacks. There will be No

side setbacks in case of row housing.

11.

There would be mixed land use in the entire Planning Area as per para 16.16 Zoning

regulations. Hence, the change of Land use shall not be attracted if the proposed

construction is a permitted activity in a particular land use zone..

16.8.1 Setbacks

1.

Construction other than as is permissible under the Himachal Pradesh Roadside Control

Act, 1972 as amended from time to time would not be allowed on the controlled width of

National Highway Authority of India (NHAI) or Himachal Pradesh Public Works

Department (HPPWD).

2.

A Front set back of minimum 3.00 Meter shall be maintained from the controlled width.

The controlled width can be allowed for parking purpose which has to be open to sky or

temporary coverings.

3.

The setbacks shall not be applicable to services like, all road side infrastructure/ facilities

such as rain shelters, toilets, landscaping etc. Such temporary structures which are

8494

jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939

specifically permitted by the Himachal Pradesh Public Works Department on the acquired

width of a road should not touch the abutting properties.

4.

In case of irregular plots or in case of site constraints, uniformity of setbacks shall not be

insisted. In such case, the Competent Authority would consider the maximum ground

coverage or minimum open area while approving such cases.

5.

In open area of setback (other than controlled width) small temple, parking, porch, garage,

swimming pool, septic tank, other services and steps up to plinth level would be

permissible.

16.8.2 Building Height

16.8.2.1 Building Height

The building height shall be the vertical distance measured:-

i.

In the case of flat roofs from the plinth level to the highest point of the building.

ii.

In case of pitched roofs from the plinth level to the highest point up to the point where

the external surface of the outer wall intersects the finished surface of the sloping roof.

iii.

In the case of gables facing the road midpoint between the eaves level and the ridge.

Where plinth level is the finished floor level of the floor just above the existing natural

ground level.

16.8.2.2 Height Exemptions

The following structures shall not be considered in regulating the height of the building: -

1.

Roof tanks and their supports not exceeding 2.00 Meter in height.

2.

Mechanical, electrical, HVAC, lift rooms and similar service equipment.

3.

Staircase mumty not exceeding 3.00 Meter in height.

4.

Architectural features serving no other function except that of decoration, chimneys, poles,

parapet and other projections not used for human habitation, may extend beyond the

prescribed height limits, not exceeding 1.50 Metre in height, unless the aggregate area of

such structures exceeds 1/3rd of the roof area of the building on which these are erected.

5.

Solar panels installed on the roof.

6.

These height regulations shall not apply to the structures housing main seat of Deity

/Sanctum / Sanctorum which are part of religious buildings e.g. Temples, Mosques,

Gurudwaras, Churches, etc. provided it is so designed and approved by the Competent

Authority. The height restrictions shall apply to the ancillary structures like dharamshala,

sarai etc.

16.8.3 Ground Coverage and Floor Area Ratio

16.8.3.1 Definition and Illustration

The Floor Area Ratio (FAR) means the quotient obtained by dividing the total covered area (plinth

area) on all floors multiplied by 100 by the area of the plot.

8495

jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939

FAR

= Total covered area of all floors x 100

Plot Area

Illustration

10.00 M

15.00 M

Total Plot Area

= 15.00 M X 10.00 M

= 150.00 M2

Setbacks

Front

= 2.00 M,

Left Side = 1.50 M

Right Side

= 1.50 M

Rear

= 1.50 M

Built Up Area

= 11.50 M X 7.00 M

(after leaving Setbacks)

= 80.50 M2

Covered Area on one floor

= 80.50 M2

Open Area

= 150.00 M2 - 80.50 M2

= 69.50 M2

Floor Area Ratio (FAR)

= 1.75

Total Built up Area

= 150.00 M2 X 1.75

(as per FAR)

= 262.50 M2

Therefore, Number of storeys

= 262.50 M2

80.50 M2

= 3.26

Number of storeys

= 3 storeys (say)

16.8.3.2 FAR exemptions

The following shall not be included in covered area for FAR and Ground Coverage calculations:

1.

Machine room for lift on top floor as required for the lift machine installation.

2.

Rockery, lift/ lift well, escalator/ travellator well and well structures, plant nursery, water

pool, swimming pool at any level (if uncovered), platform around a tree, water tank,

8496

jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939

fountain, bench, chabutara with open top and / or without enclosures, open ramps,

compound wall, gate, slide swing door, fire staircase (without enclosure), fire towers, refuse

area, fire control room, overhead water tank or top of building/ open shafts, cooling towers.

3.

Mumty over staircase on top floor maximum 3.00 M height.

4.

Watch and ward cabins of total area not more than 4.50 M2 and 6.00 M2 with W/C each at

entry and exit only, within the property line.

5.

Pergolas, sunshade elements and balconies with maximum 2 side enclosed.

6.

Plinth steps.

7.

Meter Room with HT/ LT panel, DG Room, AC Plant room, CC TV room/ Control room,

Fire Control room and similar services area permitted in the setback and shall not be

counted in FAR. Similarly Service area on habitable floors- like HVAC (Heating,

Ventilation and Air Conditioning), MEP installations, Janitor Rooms, AHU Room, Electric

room, LT Room, CCTV room, laundry or any other similar services and Building service

shafts like electrical shafts, communication shafts, fire shafts MEP and HVAC shall not be

from FAR.

8.

Entrance porch, veranda, canopies, covered Parking Area shall not be counted in FAR but

shall account for ground coverage.

9.

Basement and any floor if used for parking, household storage and services. Basement area

shall not extend beyond the ground coverage.

16.8.4 Basement or Cellar

Any storey of the building completely or partly below the natural ground level shall be considered

as basement or cellar.

Construction of basement/ cellar shall not be counted as a storey and should be constructed within

the prescribed setbacks and prescribed building lines and subject to maximum coverage on floor i.e.

entrance floor and may be put for following uses:-

i.

storage of household or other goods of ordinarily combustible material.

ii.

strong rooms, bank cellars etc.;

iii.

air conditioning equipment and other machines used for services and utilities of the

building and

iv.

parking spaces.

The basement/ cellar shall have following requirements:-

i.

All the walls shall be kept solid and without any openings; and below the natural

ground level except the portion kept for ventilation purpose;

ii.

Every basement/ cellar shall be, in every part, at least 2.40 M in height from the floor

to the underside of the roof slab or ceiling.

iii.

Adequate ventilation shall be provided for the basement/cellar and any deficiency in

ventilation requirements may be met by providing mechanical ventilation in the form

of blowers, exhaust fans and air conditioning system etc.;

8497

jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939

iv.

The minimum clear height of the ceiling of any basement/cellar shall be 0.90 M and

the maximum 1.20 M above the average surrounding ground level;

v.

Adequate arrangements shall be made such that surface drainage does not enter the

basement/cellar;

vi.

The walls and floors of the basement/cellar shall be watertight and be so designed that

the effects of the surrounding soil and moisture if any, are taken into account in design

and adequate damp proofing treatment is given;

vii.

The access to the basement/cellar shall be separate from the main and alternative

staircase providing access and exit from higher floor. Where the staircase is continuous

in the case of buildings served by more than one staircase, the same shall be enclosed

type, serving as a fire separation from the basement/cellar floor and higher floors.

Open ramps shall be permitted, if they are constructed within the building line subject

to the provision clause (v) above;

16.8.5 Regulations for Services

1.

Septic Tank or connections with sewerage lines, where available shall be mandatory.

2.

All Commercial/ Public and Semi -Public buildings above 15.00 Metres height shall have

the provisions for elevators.

3.

Firefighting provisions and specification shall be as per National Building code of India,

2016.

4.

Risks and respective mitigations shall be planned by the competent authorities such as state

Fire department and police to manage events and respond to natural disasters.

5.

Distance from Electric lines- The distance in accordance with the Central Electricity

Authority (Measures Relating to Safety and Electric Supply) Regulations, 2010 as amended

from time to time and as defined in National Building Code of India, 2016 is to be provided

between the building and overhead electric supply line as under:-

Table 0-3: Clearances from Electric Supply Lines

Source: NBC, 2016

Sr.

No.

Type of Supply Line

Vertical Clearance

Horizontal

Clearance

1.

Voltage

lines

and

service

lines

not

exceeding 650V

2.50 Metre

1.20 Metre

2.

High

voltage

lines

above 650 Volts and

including 11,000 Volts

3.70 Metre up to and

including 33kV

1.20 Metre

3.

High

voltage

lines

above

11,000 Volts and up to

and

including 33,000 Volts

3.70 Metre

2.00 Metre

4.

Extra

high

voltage

lines

additional

33,000

Volts

3.70 Metre plus 0.30

Metre

for

every

additional

33,000

Volts or part thereof

2.00 Metre plus 0.30

Metre

for

every

additional 33,000

Volts or part thereof

8498

jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939

16.9 Development Control Regulations

16.9.1 Residential Buildings

The applicant must make sure the layout plan of residential building complies with following

basic requirements:

i.

That there should be sufficient natural light and fresh air/ ventilation in the

habitable area within the building, when constructed.

ii.

That there is protection against fire, noise, dust and pollution hazards.

iii.

That circulation and access is easy and safe from any accident point of view.

iv.

The minimum plot area, minimum setbacks and maximum FAR shall be as

under:

Table 0-4: Residential Building Regulations shall be applicable in Nadaun Planning Area

Sl.

No.

Description and

Minimum Plot

Area

Minimum Set Backs

(in Meters)

Ground

Coverage

Maximum

Floor

Area

Ratio

Maximum Height in Meters

Max

DUs/

Plot

Front Side Rear

I

Row Houses with common

1

30 m2 up to 60

m2

0.90

Nil

0.90

75%

1.80

6.00

2

2

Above 60 m2 up

to 120 m2

2.00

Nil

1.00

75%

1.80

9.00

3

II

Semi-detached Houses with common wall on one side

1

2

Above 120 up to

250 m2

2.00

1.50

1.50

50%

1.50

12.00

3

III

Detached Houses

1

Above 150 m2 up

to 250 m2

2.00

1.50

1.50

50%

1.75

21.00

4

2

Above 250 m2 up

to 500 m2

3.00

1.75

1.75

45%

1.75

21.00

4

3

Above 500 m2

5.00

3.00

3.00

40%

1.75

21.00

4

Note:

1.

*: In case of the smallest category of row housing i.e. 30 sq.m. – 60 sq.m, max 60% of each

of the front and rear setback area shall be allowed for Ground Coverage. Max. 0.45M

window projection shall be allowed in the setback area.

2.

The entrance to the house shall be from the front setback area and none of the projections

shall infringe on to the road ROW.

3.

Sample Layout Plan for 30 sq.m. Row Housing building is given in Annexure 5.

4.

The three storyed building shall be permitted in the Planning Area irrespective of FAR.

16.9.2 Non-Residential Buildings

16.9.2.1 Commercial Buildings:

1.

Commercial Corridor

There is commercial corridor on Nadaun-Jwalamukhi Road, Nadaun-Hamirpur Road and Nadaun

Hoshiarpur Road in the Nadaun Planning Area. All developmental activities should strictly

conform to the Regulations without any kind of relaxation in front open area. However, Norms of

side setbacks can be relaxed, on the merit of case.

8499

jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939

2.

Market Area

There is dense market area. The already built up area in Nadaun market can be considered for in

situ re-development. There won’t be any consideration for setbacks in market, but height would be

restricted to 12.00 Metres only.

3.

Hotel Units, Lodges, Hostels, Guest Houses

i.

Minimum Plot Area

500 M2

ii.

Maximum Ground Coverage

50%

iii.

Floor Area Ratio (FAR)

2.00

iv.

Maximum Height

21.00 Metres*

* Subject to seismic and structural stability

Note: 10% of the FAR can be used as commercial space/ convenient shopping.

4.

Marriage Palaces

i.

Minimum Area

2000 M2

ii.

Maximum Ground Coverage

30%

iii.

Floor Area Ratio (FAR)

1.00

iv.

Maximum Height

15.00 Metres

5.

Community Centre

i.

Minimum Area

1000 M2

ii.

Maximum Ground Coverage

50%

iii.

Floor Area Ratio (FAR)

1.50

iv.

Maximum Height

15.00 Metres

6.

Petrol Pump

i.

Plot Size

1000 M2

ii.

Front of the plot shall not be less than

30.00 Metres

Note: Petrol Pump shall not be allowed within the Nagar Panchayat boundary.

7.

Shops

(a) Independent shop/ show rooms (standalone) above 10M2 to 30 M2

i. Maximum Height

6.00 Metres

(b) Row shops with common wall on two sides above 30M2to 100 M2

i. Floor Area Ratio (FAR)

1.75

ii. Maximum Height

9.00 Metres

(c) Row shops with common wall on two sides above 100M2to 250 M2

i. Floor Area Ratio (FAR)

1.75

ii. Maximum Height

18.00 Metres

(d) Above 100M2to 250 M2

i. Floor Area Ratio (FAR)

1.75

ii. Maximum Height

18.00 Metres

8.

Shopping Complex

(a) 500 M2 to 1500 M2

i. Floor Area Ratio (FAR)

1.75

ii. Maximum Height

18.00 Metres

8500

jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939

(b) Above 1500 M2 to 4000 M2

i. Floor Area Ratio (FAR)

1.75

ii. Maximum Height

18.00 Metres

(c) Above 4000 M2

i. Floor Area Ratio (FAR)

1.50

ii. Maximum Height

18.00 Metres

16.9.2.2 Public-Semi Public Buildings

i. Minimum Plot Size

500 M2

ii. Maximum Ground Coverage

40%

iii. FAR

2.00

iv. Maximum Height

30 Metres*

* Subject to seismic and structural stability

9.

Educational Facilities

(a)

Nursery School

i. Maximum ground coverage

33.33%

ii. Maximum FAR

1.00

iii. Maximum Height

9 Metres

(b) Primary School

i. Maximum ground coverage

40%

ii. Maximum FAR

1.20

iii. Maximum height

15 Metres

(c) Higher Secondary School

i. Maximum ground coverage

35%

ii. Maximum FAR

2.00

iii. Maximum height

15 Metres

(d) College

i. Maximum ground coverage

35%

Note:

1. In case of the above premises the total area of the plot shall be divided in-

(i) School/college building area

(ii) Play field area

(iii) Parking area

(iv) Residential and hostel area

2. The maximum ground coverage and FAR shall be calculated only on the areas meant for

building.

16.9.3 Industrial Use:

The Regulations for Industrial use/activities shall be as per Regulations contained in Appendix-2 of

the Himachal Pradesh Town and Country Planning Rules, 2014.

For Industrial use/activities, following Regulations shall be applicable:-

8501

jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939

i.

Minimum area of plot:

For small scale industry shall be 250 M2 to 500 M2.

(b) For services/light scale industry shall be 501 M2 to 1000 M2.

(c) For medium scale industry shall be 1001 M2 to 5000 M2.

(d) For large and heavy scale industry shall be above 5000 M2.

(e) The plot area as mentioned in clauses (a) to (d) above would not be applicable in the cases

where the sub-division of land has taken effect before the commencement of the Himachal Pradesh

Town and Country Planning Rules, 2014.

The plot area as mentioned under clauses (a) to (d) above would not be applicable for the individual

plots, if any, created/allotted by the Himachal Pradesh Industries Department and Himachal

Pradesh State Industrial Development Corporation (HPSIDC) or any other Authority prior to

coming into force of the Himachal Pradesh Town and Country Planning Rules, 2014.

The layout and design of industrial area, if any, shall be as per requirement of the Industry and shall

be got approved from the Director.

ii.

Height of floor/storey:

The minimum floor/ storey height of industrial building shall be 3.00 Metres and sloping roof

height shall be in accordance with volume of the structure. In case of roof trusses, height of

building should be adjusted /relaxed accordingly.

The plot area, minimum set-backs, maximum Floor Area Ratio (FAR) and maximum height of

building shall be governed by following Table:

Table 0-5: For Industrial Uses

Sr.

No

.

Type of

Industry

Plot area

in M2

Minimum Set Back in

Metres

Max.

FAR

Max. Height in Metres

from Mean Sea Level

up to

1000 M

Fron

t

Left

Righ

t

Rea

r

1.

Small

Scale

Industries

250

to

500

3.00

2.00

2.00

2.00

1.75

15.00

2.

Services/

Light

scale

Industries

501

to

1000

5.00

2.00

2.00

3.00

1.50

15.00

3.

Medium

Scale

Industries

1001 to

5000

10.0

0

5.00

5.00

5.00

1.25

20.00

4.

Large

and

Heavy Scale

Industries

Above

5000

15.0

0

7.50

7.50

7.50

1.00

20.00

Note:-

(i) Minimum width of path/road abutting one side of plot shall be 5.00 M.

(ii) Service area required for pharmaceutical units or such type of Industries under requirement of

Goods Manufacturing Practice (G.M.P) shall not be included for calculation of FAR, provided it is

only used for utilities and services but not in any case for production.

(iii) For ancillary uses like security post/room shall be allowed in set-back area i.e. one wall shared

with the boundary wall and shall be counted in the Floor Area Ratio (FAR).

8502

jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939

16.9.4 Other Regulations

16.9.4.1 Other General Regulations

Regulations for Solar Passive Building Design, for Development of Barrier Free Environment for

the Persons with Disabilities in Public and Semi Public Building & Re-creational Areas within the

limits of Economic Capacity, for Rain Water Harvesting, for Development of Apartments and

Colonies in Real Estate Projects and for Installation for Communication Towers shall be as

prescribed in the Himachal Pradesh Town and Country Planning Rules, 2014.

16.9.4.2 Regulation for development of Information Technology Park (IT/Bio-Park)

The development of Information Technology Park shall be regulated as per Regulations contained

in Appendix-3 of the Himachal Pradesh Town and Country Planning Rules, 2014.

16.9.4.3 Regulations Fire and Life Safety

The provisions of fire and life safety as enshrined in the National Building Code of India, 2016

shall be applicable to buildings having height of 15.00 Meter or above and having floor area more

than 500 M2 on any one or more floors and in case of Institutional Buildings it shall be applicable

to the buildings having height of 9.00 Meter and above.

16.9.5 Relaxations

In the public interest and in the interest of town design or any other material consideration the

Competent Authority may relax minimum size of plot, setbacks and Floor Area Ratio (FAR). The

decision of the Competent Authority shall be final.

16.10 Special Area Regulations

16.10.1 Heritage Area

Heritage structures within Nadaun Planning Area shall be considered as per the regulations

The existing heritage buildings and structures within the Nadaun Planning Area shall be notified

but not limited to those identified in the Development Plan. The Competent Authority shall be

responsible for identifying such buildings. The historical structures as mentioned below with in

Nadaun planning area are of regional and local importance and should follow the Heritage area

regulations mentioned below:

1. Nadaun fort

2. Other heritage structure of local importance namely

Samadhi of Dhyanu Bhagat,

Baoli or Step Wells,

Paudiyan or Steps Ghats (Matta wali Paudiyan and Kaji Pattan Paudiyan)

The following regulations shall be applicable in Heritage Areas, namely:-

1.

The façade of the building/blocks shall be maintained in its pristine context in case of

reconstruction of existing buildings, however the internal changes shall be undertaken after

a thorough heritage audit of the structure.

2.

In case of re-construction on old building lines, the existing plinth area, number of storeys

and floor heights shall not be altered.

8503

jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939

3.

Constructions shall be permissible on the vacant sites subject to the condition that the height

of such buildings does not exceed the height of surrounding heritage buildings and also does

not obstruct the view in any way.

4.

Sensitive reconstruction is permissible but only for buildings that are dilapidated/

structurally unsafe as certified by a Structural Engineer and corroborated by the Heritage

Conservation Committee of the Himachal Pradesh. The reconstruction should not follow the

prevailing byelaws but should be in such a manner which ensures that the building/ precinct

character is not diminished.

5.

The existing parks, green & open spaces shall be preserved/restored as such to enhance the

historical structures & elements and integrate them in the new proposal with minimum

alterations.

16.10.1.1 Restrictions on Development or Re-development in Heritage Areas

1.

No development or redevelopment or engineering operation or additions / alterations,

repairs, renovations including painting of the building, replacement of special features or

plastering or demolition of any part thereof of the said listed buildings or listed precincts or

listed natural feature areas shall be allowed except with the prior permission of the

Competent Authority. Before granting such permission, the agency concerned shall consult

the Heritage Conservation Committee appointed by the State Government and shall act in

according with the advice of the Heritage Conservation Committee.

2.

Provided that, before granting any permission for demolition or major alterations / additions

to listed buildings (or buildings within listed streets or precincts), or construction at any

listed natural features, or alteration of boundaries of any listed natural feature areas,

objections and suggestions from the public shall be invited and shall be considered by the

Heritage Conservation Committee.

3.

Provided that, only in exceptional cases, for reasons to be recorded in writing, the

Competent Authority may refer the matter back to the Heritage Conservation Committee for

reconsideration. However, the decision of the Heritage Conservation Committee after such

reconsideration shall be final and binding.

4.

On the advice of the said Heritage Conservation Committee appointed by the Government

and for reasons to be recorded in writing, the Competent Authority shall follow the

procedure as per Himachal Pradesh Town and Country Planning Act,1977 as amended from

time to time to alter, modify or relax the Development Control Regulations prescribed in the

Development Plan, if required, for the conservation or preservation or retention of historic

or aesthetic or cultural or architectural or environmental quality of any heritage site.

16.10.2 Mixed Land Use along National Highways

For controlling linear mixed use development, the building use permissibility & accessibility to

individual plots as well as large developments shall be governed as below:

1.

In case of building line of the properties adjoining the main highway, a minimum distance

between road and building from the edge of RoW shall be followed as mentioned in table

below.

8504

jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939

Table 0-6: Standards for building lines and control lines for Plain and Rolling terrain for

Built-up area

Sr.

No.

Classification of Road

Minimum

Set-back

from

road

boundary (meters)

1

National & state highways

3

2

Major district roads

3

3

Other district roads

3

4

Village roads

3

Source: IRC: 73-1980

2.

Any new access opening on the highway shall be duly permitted by Competent Authority.

3.

Essential highway amenities and services, namely, petrol pump, service station including

emergency repair services, restaurants, parking lots, motels, police check-post, toll station,

shall be permitted direct access from the National Highway crossing the Nadaun planning

area boundary. Such access shall be provided with proper lay-by as per the guidelines

specified by the Indian Road Congress or Competent Authority.

3.

Boundary walls, fences, advertisements, hedges, trees shall not cause obstruction of view

for the road users.

Restrictions on structures between highway control lines and building line:-

The following activities shall not be allowed between-Right of Way of the National Highway and

the permissible building line of the plots in subject:

1. construct, form or lay out any means of access to, or from, a highway, or

2. erect any building, or

3. make or extend any excavation

16.10.3 Old Market Area (Pattan Bazar)

The development control regulations for the identified Pattan Bazar streets lying in the core urban

area of Nadaun municipal boundary shall be followed as below:

1.

All whole sale shops with activities generating huge traffic, must be shifted to other low

traffic impacting streets.

2.

Activities involving heavy vehicular movements like vehicle repair shops, whole sale shops,

Godowns (specially gas Godowns), service and repair centre, noxious and hazardous

wholesale trades, industrial activities, junk and scrap material shops, building material

shops, automobile shops, ice factories shall be prohibited or relocated to low traffic

impacting streets.

3.

The old market area as demarcated in the Development plan 2035 shall be governed by the

restricted use of different modes of transport. Such restrictions should be in the form of time

segregation and/or vehicle typology.

4.

Building heights to be restricted up to 12 m.

8505

jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939

5.

In case of redevelopment, the existing building line should be maintained.

6.

All hawkers must be in the identified hawking zones as demarcated by the Competent

Authority.

7.

Shops and establishment signboards should follow the height strategy developed by the

Competent Authority.

16.11 Risk Based Classification of Buildings

In order to mitigate any disasters, risk based buildings have been classified in three categories

namely,-

1. High Risk Buildings

2. Medium Risk Buildings

3. Low Risk Buildings

Table 0-7: Risk Based Classification of Buildings for Nadaun Planning Area

Sr.

No.

Risk

Buildings

Planning

Permission

Time *

1.

Residential Buildings

(a)

High

Group Housing Schemes, above 3 Storey

buildings, buildings on slopes more than

30º, any building raised on landfill,

reclaimed land, buildings 2.00 M above the

Highest Flood Level (HFL) up to a distance

of

10.00

Metre,

buildings

with

communication towers and buildings falling

under the corridor of HT/LT lines.

Within 60

days.

(b)

Moderate

All 2-3 storey buildings, buildings on slopes

above 15º and up to 30º.

Within 30

days.

(c)

Low

Single Storey Buildings Constructed On

Slope Less than 15º.

Within 20

days.

2.

Commercial Buildings

(a)

High

Commercial

Shopping

Complexes,

Multiplexes,

Tourism

Units,

Marriage

palaces,

Automobile

Showrooms,

any

building raised on landfill, reclaimed land,

buildings within the minimum setback from

HFL as prescribed in respective DPs,

buildings with communication towers and

buildings falling under the corridor of

HT/LT lines.

Within 60

days.

(b)

Moderate

Double storey shops

Within 30

days.

(c)

Low

Single storey shops

Within 20

days.

3.

Industrial Buildings

(a)

High

Buildings above two storeys, any building

above 10 meters height, any building raised

Within 60

days.

8506

jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939

Sr.

No.

Risk

Buildings

Planning

Permission

Time *

on landfill, reclaimed land, buildings

within the minimum setback from HFL as

prescribed in respective DPs, buildings with

communication towers and buildings falling

under the corridor of HT/LT lines.

(b)

Low

Single storey buildings of 10 meters or less

than 10 meters height.

Within 20

days.

4.

Public and Semi-Public

(a)

High

All buildings except for the buildings

mentioned under Low Risk category

Within 60

days.

b)

Low

Toilets, rain shelters, pump houses and

crematoriums.

Within 20 days.

5.

Mixed Land Use Buildings

(a)

High

All buildings.

Within 60

days.

*: As amended from time to time by the State Govt.

Note:-

i.

The High Risk category of constructions will be supervised by the Registered Private

Professionals and the Structural Safety Certificate & Design will be submitted by the

Registered Structural Engineers.

ii.

The Moderate Risk and Low Risk Category buildings would be given fast track

approval.

16.12 Monitoring of Construction

1.

The applicant shall intimate in writing to the concerned competent authority that the work

of execution of building has reached the plinth level. The competent authority shall inspect

the executed work within 15 days and shall allow the applicant for further construction,

only if the same is found in order.

2.

In case the competent authority does not inspect the site within the prescribed period, the

applicant shall certify that he has carried the construction up to plinth level in accordance

with permission order and consequent upon not conducting the inspection within stipulated

period, the applicant is undertaking the further construction in accordance with permission

order.

3.

If the competent authority on inspection later on observes at any stage that the work has not

been carried in accordance with the approved plan, notice of unauthorized construction or

deviation shall be served upon for restoration of the same to its original condition as

prescribed in the Act or any other action as specified in Rules and Regulations thereunder.

4.

The concerned competent authority, if required, may direct the applicant to revise the

building plan as per requirement of Rules and Regulations and if it is found in order, the

revised map shall be approved.

5.

After completion of the building, the applicant shall submit a completion plan along with a

certificate to the concerned competent authority certifying that the construction has been

completed as per the approved map.

6.

Building shall not be put to use prior to issuance of completion certificate by the competent

authority.

8507

jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939

16.13 No Change of Land Use

No Change of Land use shall be permitted for the Sericulture Land parcels as marked in the

Development Plan, for any other activities which is not subservient to sericulture.

16.14 Regulations for Land Pooling and Re-constitution of Plots

1.

On commencement of this Development Plan, no person shall be allowed to carve out plots

of zig-zag ‘Khasra’ Numbers in his ownership and the same have to be organized along

with other such adjoining parcels of land to ensure proper dimensioned plots to the

purchasers, on one hand and in the interest of urban design, safety, economy, functionality,

aesthetics and optimum use of land, on the other.

2.

Land Pooling scheme shall be worked out on the basis of population and area required for

facilities and amenities for the proposed population.

3.

In a land pooling scheme, the land owners shall surrender a part of their land for circulation,

public facilities and amenities i.e., Public Purposes as per the pooling percentage. The

remaining land shall be made available to the land owners proportionate to their original

plot areas.

4.

The pooling percentage for a land pooling scheme shall be based on the formula below:

Pooling

= Area required for Public Purpose

%age Total Area of Land Pooling Scheme

Where area required for public purpose shall include road/path/circulation, infrastructural

facilities and networks, parking, parks, open spaces, playgrounds and recreational pursuit.

5.

In case of any person whose plot comes within the roads or community amenities, he shall

be suitably relocated within the vicinity of the existing plot to the extent possible.

16.15 Sub-Division of Land Regulations

1.

The Sub-Division of land into plots amounts to “Development” under the Himachal Pradesh

Town and Country Planning Act, 1977 as amended from time to time. No person shall sub-

divide his land unless permitted to do so in accordance with Rules and Regulations in force.

2.

Similarly no Registrar or the Sub-Registrar shall register any sale deed or documents of any

sub-division of land on share basis unless the sub-division of land is duly approved by the

competent authority in accordance with provisions of the Himachal Pradesh Town and

Country Planning Act, 1977 as amended from time to time and sub- division of land

Regulations as contained in this Development Plan.

3.

Natural Nallahs and Khads which passes through land/ land sub-division shall be developed

and maintained according to discharge of water during the peak rainy season. The minimum

distance of building from such Nallahs should be at least 3.00 Metre. The minimum

distance of building from the bank of such Khads (i.e, Man Khad) should not be less than

5.00 Metre.

4.

One side of every residential plot shall abut with minimum 3.00 M wide access road.

8508

jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939

5.

In case of plots or land abutting the existing or proposed roads or paths is of lesser width

than required width, width of the same shall have to be increased to meet requirements of

width for requisite plots.

6.

Minimum width of plot shall be 4.00 M.

7.

Any yard or plot existing at the time of coming into force of these Regulations shall not be

reduced in dimension or area below the minimum requirement set forth herein. The yards or

plots created after the effective date of these Regulations shall meet at least the minimum

requirements established by these Regulations. All the plots registered prior to coming into

force of these Regulations shall be treated as plots irrespective of their size subject to the

condition that 3.00 Metre wide road abutting one side of the plot will be the basic

requirement.

8.

If 3.00 Metre wide road is not available at site and if it is less in width then the owner shall

surrender the remaining width of the road ROW from his plot to make the road as 3.00

Metre wide. In such case the setback shall be considered from the revised ROW of the

access road.

9.

The construction would be allowed on hereditary owned smaller plots on and above 30

sq.m. i.e., minimum plot size for row housing as per Table 0-4.

10.

If the plot size after sub-division is coming less than 30 sq.m., then the plot cannot be sub-

divided further, however independent floors/strata division shall be allowed.

11.

Regulations for the development of a Group Housing Scheme shall be governed by the

Appendix-7 of the Himachal Pradesh Town and Country Planning Rules, 2014 ‘Regulations

for Development of Apartments and Colonies in Real Estate Project’.

12.

Where it is essential to develop a plot by cutting of natural land profile, it shall be the

responsibility of the plot owner to provide retaining and breast walls, according to the

engineering specifications, so that such cutting of natural profile shall not exceed more than

3.50 Metre in height.

13.

Development proposal for a part of land or khasra no. shall be considered. However,

proposal for complete land holding/khasra No. shall be submitted even if planning

permission is required for part of the land provided further that at least one road of adequate

width in view of total area of complete land holding/khasra No. shall have to be proposed to

ensure access for balance area in conformity to following point.

14.

The minimum width of road for sub-division shall be 7.00 m. However, in view of

geographical constraints, width of road/ path may be relaxed to 3.00 m for maximum plot

up to 5 in number. The minimum width of path/ road abutting one side of plot shall be 5.00

m to cluster of plots from 6 to 10 in number. For group of plots between 11 to 20 in number

(2000 to 4000 sq.m.) on one particular access, the minimum vehicular access shall be 7.00

m wide. In case of plots exceeding 20 in number (more than 4000 sq.m.) the minimum

width of road of road shall be 9.00 m.

8509

jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939

16.16 Zoning Regulations

The land in the proposed Development Plan has been categorized into nine Land Use Zones:

I. Residential Use Zone

II. Commercial Use Zone

III. Mixed Use Zone

IV. Industrial Use Zone

V. Public/Semi-Public Use Zone

VI. Recreational Use Zone

VII. Transport Use Zone

VIII. Primary Activity Use Zone

IX. Protected & Undevelopable Use Zone

16.16.1 RESIDENTIAL (R)

The activities Permitted, Restricted and Prohibited in Residential land use zone shall be as given

below:

(a)

Activities Permitted

Residence plotted (detached, semi-detached and row housing), Group housing, work-cum-

residential, Hostels, boarding and lodging houses, Night shelters, guest houses, Educational

buildings (nursery, primary, high school), Religious places, Neighborhood level social, cultural and

recreational facilities with adequate parking provisions, Community halls, Convenience shopping,

local (retail) shopping, Community centers, clubs, Auditoriums, Exhibition and art galleries,

Libraries and gymnasiums, Health clinics, yoga centers, dispensaries, nursing homes and health

centers (20 beds), Public utilities and buildings except service and storage yards, Electrical

distribution depots and water pumping stations,

Nursery and green houses, Services for households (salon, parlors, bakeries, sweet shops, dry

cleaning, internet kiosks etc.), Banks and professional offices not exceeding one floor, Bus stops,

taxi stands, Police posts and post offices, Parks and tot–lots.

(b)

Activities Restricted

Shopping centers, Village council, local council, state and central government offices, Colleges and

research institutions, Petrol pump, Places of entertainment, cinema halls, restaurants and hotels,

Markets for retail goods, IT and IT enabled services, Tourism related services, Motor vehicle

repairing, Workshop, garages, storage of LPG cylinders, Burial grounds, Printing presses

employing not more than 10 persons, Godowns /warehousing of non-perishables, Bus depots

without workshop, Household industries (if the area for such use does not exceed one floor and

there shall be no public display of the goods)

(c)

Activities Prohibited

Heavy, large and extensive industries, Noxious, obnoxious and hazardous industries, Warehousing,

storage godowns of perishables, hazardous, inflammable goods, Wholesale mandis, Junk yards,

Workshops for buses, Slaughter houses, Hospitals treating contagious diseases, Sewage treatment

plants and disposal sites, Water treatment plants, Solid waste dumping grounds, Outdoor and

indoor games stadiums, Shooting range, Zoological garden, botanical garden, bird sanctuary,

International conference centers and all uses not specifically permitted above.

16.16.2 COMMERCIAL USE (C)

The Commercial zone can be sub-divided into:

8510

jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939

1. Retail Shopping Zone and General Business: C1

2. Hospitality/ Hotels/ Lodges: C2

3. Wholesale, Go-downs, Warehousing/ Regulated markets and Service Sector: C3

The activities Permitted, Restricted and Prohibited in Commercial land use zone shall be as given

below:

(a)

Activities Permitted

Retail and wholesale business, mercantile, commercial centres, Wholesale storage yards, Godowns,

covered storage and warehousing, Banks, financial services and stock exchanges, Perishable goods

markets, Business and professional offices, Private institutional offices and semi government

offices,

Shops and shopping malls, Commercial services, Restaurants and hotels, Hostels, boarding houses,

guest houses, Social and welfare institutions, Convenience and neighborhood shopping centres,

Local shopping centres, weekly and formal markets, Bakeries and confectionaries, Cinema halls,

theatres, banquet halls, auditoriums, Community halls, night shelters, Clinics and nursing homes,

Petrol Pumps, IT and IT enabled services, Commercial institutes, Research and training institutes,

Parking lots, Taxi stands, Two-wheeler stands.

(b)

Activities Restricted

Associated residential uses, Warehousing, storage godowns of perishable, inflammable goods, coal,

wood, timber yards, Non- polluting, non- obnoxious light industries, Junk-yards, Service centres,

garages, workshops, Printing presses employing not more than 10 persons, 20 bedded hospitals not

treating contagious diseases and mental patients, Weigh bridges, Gas installation and gas works,

Colleges, polytechnics and higher technical institutes, Sports complex and stadiums, Transient

visitor’s homes, Places of entertainment, Recreational uses and museums, Convention centres,

Religious places, Public Utilities, Telephone Exchanges, Police posts and post offices, Picnic Hut,

Truck terminal, bus depots and parking.

(c)

Activities Prohibited

Polluting industries, Heavy, extensive, noxious, obnoxious, hazardous and extractive industrial

units, Hospitals, research laboratories treating contagious diseases, Poultry farms, dairy farms,

slaughter houses, Sewage treatment plants and disposal sites, Solid waste treatment plants and

dumping grounds, Agricultural uses, Storage of perishable and inflammable commodities,

Quarrying of gravel, sand, clay and stone, Zoological gardens, botanical gardens and bird

sanctuary, Sports training centres, Courts and all other related activities which may cause nuisance.

16.16.3 MIXED USE (M)

The activities Permitted, Restricted and Prohibited in Mixed land use zone shall be as given below:

(a)

Activities Permitted

In the mixed use zone all activities falling within permitted land use (dominant land use) shall be

minimum 60% and to co-exist with commercial, institutional and recreational which shall include

Residential Plot- Plotted housing and Group housing, Residential-cum-work plot, Employees

housing, Guest House, Boarding and Lodging houses, Hostel, Dharamshala and its equivalent,

Night shelter, Local Level (Convenience/ Local Shopping Centre), Cinema/ Multiplexes, Post

Offices, Parks and Playgrounds, Service industry, Road network with street furniture, Bus Stops,

Taxi stand, Parking, Community hall/barat ghar, Community/ Recreational Hall, Library, Reading

Room, Society Office, Creche and Day Care Centre, Nursing home/ Polyclinic/ Clinical

Laboratory, Religious premises, Gymnasium, Yoga Centres, Banks, clubs, ATM, Police stations,

Police post

8511

jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939

(b)

Activities Restricted

Activities related to non-polluting household industrial land use shall be allowed to a maximum of

10%.

(c)

Activities Prohibited

All other activities especially industrial which are polluting in nature and which will have adverse

impact on the overall activities of this zone.

16.16.4 INDUSTRIAL USE (I)

The activities Permitted, Restricted and Prohibited in Industrial land use zone shall be as given

below:

(a)

Activities Permitted

All kind of non-polluting industries, agro-based and household industries, Loading, unloading

spaces, Warehousing, storage and depots of non-perishable and non- inflammable commodities,

Cold storage and ice factory, Gas Godowns, Wholesale business establishments, Petrol filling

station with garages and service stations, Bus terminals and bus depots and workshops, Parking,

taxi stands, Residential buildings for essential staff and for watch and ward, Public utilities.

(b)

Activities Restricted

Heavy, extensive and other obnoxious, hazardous industries subject to the approval of the

Himachal Pradesh Pollution Control Board, Industrial Research Institute, Technical Educational

Institutions, Junkyards, sports/ stadiums/ playgrounds, Sewage disposal works, electric power

plants, service stations, cemeteries, Govt. semi-govt., private business offices, Banks, financial

institutions and other commercial offices, Agro-based industries, dairy and farming, Gas

installations and gas works, Workshops garages, Hotels and guest houses, Hospitals and medical

centres.

(c)

Activities Prohibited

General business unless incidental to and on the same site with industry, Schools and colleges,

Hotels, motels and caravan parks, Recreational sports or centers, Other non-industrial related

activities, Religious buildings, Irrigated and sewage farms, Major oil depot and LPG refilling

plants, Social buildings and all uses not specifically permitted above.

16.16.5 PUBLIC AND SEMI-PUBLIC USE ZONE (PS)

The Public and Semi Public use zone can be sub divided into:

1. Govt./ Semi Govt. / Public Offices: PS 1

2. Educational and Institutional: PS 2

3. Medical and Health PS 3

4. Heritage and Socio-Cultural: PS 4

5. Utilities and Services: PS 5

The activities Permitted, Restricted and Prohibited in Public and Semi Public use zone (PS - 1 to PS

- 5) shall be as given below:

(a)

Activities Permitted

Government offices, central, state, local and semi-government, public undertaking offices,

Universities and specialized educational institutions, colleges, schools, research and development

centres, Social and welfare centres, Libraries, Hospitals, health centres, dispensaries and clinics,

8512

jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939

Social and cultural institutes, Religious buildings, Marriage halls, community halls, Conference

halls, Museums, art galleries, exhibition halls, auditoriums, Police stations, police lines, jails, Local

state and central govt. offices uses for Defence purpose, Educational and research institutions,

Social and cultural and religious institutions, Local village council facilities, Uses incidental to

govt. offices and for their use, Monuments

(b)

Activities Restricted

Residential flats, residential plots for group housing and staff housing, IT services , Hostels, transit

accommodation, Entertainment and recreational complexes, Nursery and kindergarten, welfare

centre, Open air theatre, playground, Residential club, guest house, Truck terminals, helipads ,

Parking areas, taxi stands, two-wheeler stands

(c) Activities Prohibited

Heavy, extensive and other obnoxious, hazardous industries, Slaughterhouses, Junkyard, Wholesale

mandis, Dairy and poultry farms, farmhouses, Workshops for servicing and repairs, Processing and

sale of farm products and all uses not specifically permitted above

Utilities and Services: PS-6

(a)

Activities Permitted

Post offices, Telegraph offices, public – utilities and buildings, Water Treatment Plant, Sewage

Treatment Plant, Solid waste Treatment Plant solid waste dumping grounds, Radio transmitter and

wireless stations, telecommunication centres, telephone exchange, Water supply installations,

Sewage disposal works, Service stations, Cemeteries/burial grounds and cremation grounds, Power

plants/ electrical substation, Radio and television station, Fire stations

(b)

Activities Restricted

Service industry, Warehouse/storage godowns, Health centre for public and staff or any other use

incidental to public utilities and services, Information/Payment kiosk, Incidental/ancillary

residential use, Truck terminals, helipads, Commercial uses centre

(c) Activities Prohibited

Any building or structure which is not required for uses related to public utilities and activities is

not permitted therein. Heavy, extensive and other obnoxious, hazardous industries and all uses not

specifically permitted above.

16.16.6 RECREATIONAL USE ZONE (R)

The activities Permitted, Restricted and Prohibited in Recreational Use Zone shall be as given

below:

(a)

Activities Permitted

Regional parks, district parks, playgrounds, Botanical/zoological garden, Bird sanctuary, Clubs,

stadiums (indoor), outdoor stadiums with/ without health centre for players and staff, Picnic huts,

holiday resorts, Shooting range, Sports training centres, specialized parks/maidans for multiuse,

swimming pool, Special recreation and special educational areas, Library, public utilities.

(b) Activities Restricted

Building and structures ancillary to use permitted in open spaces and parks such as stand for

vehicles on hire, taxis and scooters, bus and railway passenger terminals, Facilities such as police

post, fire post, post and telegraph office, Commercial use of transit nature like cinema, circus and

other shows, Public assembly halls, Restaurants and caravan parks, Sports stadium, open air

cinemas

8513

jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939

(c) Activities Prohibited

Any building or structure which is not required for open air recreation, dwelling unit except for

watch and ward personnel and uses not specifically permitted therein.

16.16.7 TRANSPORT USE ZONE (T)

The activities Permitted, Restricted and Prohibited in Transport use zone shall be as given below:

(a)

Activities Permitted

All types of roads, Rail terminal, goods terminal, circulations, Bus stops and Bus and Truck

terminals

Taxi stands, Parking areas, Filling stations, Transport offices, booking offices, Night shelter,

boarding houses, Banks, Restaurants, Workshops and garages, Automobile spares and services,

Godowns, Loading and unloading platforms (with/without cold storage facility), weigh bridges,

Ware houses, Storage depots, Utility networks (drainage, sewage, power, tele-communications)

(b)

Activities Restricted

Way side shops and restaurants, Authorized/Planned Vending areas, Incidental/ancillary residential

use, Emergency health care centre, Tourism related projects, All ancillary (complimentary) uses for

above categories (subject to decision of the Authority)

(c) Activities Prohibited

Use/activity not specifically related to transport are not permitted herein and all uses are not

specifically permitted as above.

16.16.8 PRIMARY ACTIVITY USE (PA)

Primary Activity can be sub divided into

1. Agriculture: PA 1

2. Plantation: PA 2

3. Forest: PA 3

The activities Permitted, Restricted and Prohibited in Primary Activity zone shall be as given

below:

(a)

Activities Permitted

Dwelling for the people engaged in the farm (rural settlement), Farm-houses and accessory

buildings, Agriculture, horticulture and forestry, poultry, piggeries and dairy farm, Cottage

industries, storage, processing and sale of farm produce, Petrol and other fuel filling stations,

Fishing, Public utility and facility buildings.

(b)

Activities Restricted

Farm houses, Extensive industry, brick kilns, Sewage disposal works, Electric power plant,

Quarrying of gravel, sand, clay or stone, Service industries accessory to obnoxious and hazardous

industries, School and library and religious buildings.

(c)

Activities Prohibited

Residential use except those ancillary uses permitted in agricultural use, Heavy extensive, noxious,

obnoxious and hazardous industries, any activity which is creating nuisance and is obnoxious in

nature.

8514

jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939

16.16.9 PROTECTED AND UNDEVELOPABLE USE ZONE (E)

The protective and undevelopable use zone shall be sub divided into

1. Water bodies: E1

2. Protected Forest: E2

3. Green Belt/Buffer: E3

4. Undevelopable use zone: E4

1.

Water bodies

(a)

Activities Permitted

Rivers, canals, Streams, water spring, Ponds, lakes, Reservoir, Water Catchment Area

(b)

Activities Restricted

Fisheries, Boating, water theme parks, water sports, lagoons, Any other use/activity incidental to

Water Bodies Use is permitted.

(c) Activities Prohibited

Use/activity not specifically related to Water Bodies Use not permitted herein. All uses not

specifically permitted above.

2.

Protected Forest:

(a)

Activities Permitted

Agro and Social forestry, Felling or removing trees or timber or other forest-produce from such

forests for their own use for the purposes of trade.

(b)

Activities Restricted

Cutting, sawing and conversion, Removal of trees and timber, Collection, manufacture and removal

of forest-produce, from protected forests.

(c) Activities Prohibited

Any kind of development residential, industrial or commercial, Quarrying of stone, Burning of lime

or charcoal, Collection or subjection to any manufacturing process, or removal of, any forest-

produce in any such forest, Breaking up or clearing for cultivation, for building, for herding cattle

or for any other purpose, of any land in any such forest.

3.

Undevelopable use zone:

Undevelopable use zone shall be identified as all earthquake/landslide prone, cliffs and

environmentally hazardous area, areas adjacent to fault lines, areas with slope higher than 45

degree (NBC), flood plain and other areas identified by State Disaster Management Authority and

all the environmentally sensitive areas.

(a)

Activities Permitted

Afforestation

(b)

Activities Restricted

Quarrying of gravel, sand, clay or stone, Check dam to store water after clearance from the

authority, Special outdoor recreations

(c)

Activities Prohibited

All uses not specifically permitted above

8515

jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939

BIBLIOGRAPHY

1.

Urban Development Department - Himachal Pradesh, http://ud-hp.in/ulblist.html

2.

History of the Punjab Hill States, J. Hutchinson and J. Ph. Vogel, 1933

3.

Brief

Industrial

Profile

of

Hamirpur

District,

MSME

(2012).

Available

at

dcmsme.gov.in/dips/DIP%20Hamirpur.pdf.

4.

District Census Handbook, Hamirpur, Himachal Pradesh (2011) Village and Town Wise

Primary Census Abstract (PCA). Available at www.censusofindia.com.

5.

District Disaster Management Plan, Hamirpur, Himachal Pradesh (2012). Available at DC

office, Hamirpur district.

6.

District Statistical Handbook, Hamirpur, Himachal Pradesh (2014-15). Available at District

Statistics Office, Hamirpur.

7.

Geological Study Report, Hamirpur District

8.

Study on the Drainage System, mineral potential and feasibility of mining in river/ stream

beds of District Hamirpur, Mining Dept., Geological Wing, Hamirpur Economic Survey,

Himachal Pradesh (2014-15).

9.

Ground Water Information Booklet, Hamirpur District, Himachal Pradesh (2013). Available

at www.cgwb.gov.in/District_Profile/HP/Hamirpur.pdf.

10.

Socio Economic Indicators of Himachal Pradesh, Department of Economics and Statistics,

Shimla, Himachal Pradesh (2013). Available at State Statistical Office, Shimla.

11.

State Environment Report, Himachal Pradesh (2012).

12.

Government of India, 2012, District Disaster Management Plan: District Kangra, Himachal

Pradesh, the Government of India-UNDP Disaster Risk Reduction (DRR) Programme

(2009-12), UNDP.

13.

World Health Organization, 2007, Risk reduction and emergency preparedness:

14.

Urban and Regional Development Plan Formulation and Implementation Guidelines (2015).

15.

Village and Town Directory, Hamirpur District (1991, 2001 and 2011). Available at Census

of India Office, New Delhi

16.

Himachal Pradesh Town and Country Planning (Amendment) Rules, 2015

17.

http://www.indianrajputs.com/view/nadaun

18.

http://himachal.gov.in

19.

http://areaprofiler.gov.in/aboutUsIntgeratedPES.do?stateCode=0&lbCode=736&languageId

=1

20.

http://hppwd.gov.in/Download/NH%20Detail.pdf

21.

http://sjvn.nic.in/project-details.htm?14

22.

http://wikimapia.org/21152046/Dhaulasidh-H-E-Project

23.

http://www.sappi.com/regions/sa/SappiSouthernAfrica/Sappi%20Forests/Tree%20Faming

%20Guidelines/Part%203_Forest%20Engineering_Chapter%207_Terrain%20Classification

.pdf

8516

jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939

8517

jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939

8518

jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939

8519

jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939

8520

jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939

8521

jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939

8522

jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939

8523

jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939

8524

jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939

8525

jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939

8526

jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939

8527

jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939

8528

jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939

8529

jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939

8530

jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939

8531

jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939

i;kZoj.k] foKku ,oa izkS|ksfxdh foHkkx

vf/klwpuk

f'keyk&2] 1 uoEcj] 2017

la[;k% ,lVhbZ&ch¼3½&1@2016-&&fgekpy izns'k ds jkT;iky] Hkkjr ds lafo/kku ds vuqPNsn 309

ds ijUrqd }kjk iznRr 'kfDr;ksa dk iz;ksx djrs gq,] fgekpy izns'k yksd lsok vk;ksx ds ijke'kZ ls]

fgekpy izns'k] i;kZoj.k] foKku ,oa izkS|ksfxdh foHkkx esa fof/k vf/kdkjh] oxZ&II ¼jktif=r½ vfyfid

oxhZ; lsok,a] ds in ds fy, bl vf/klwpuk ls layXu mikcU/k&^d* ds vuqlkj HkrhZ vkSj izksUufr fu;e

cukrs gS] vFkkZr~%&

1- laf{kIr uke vkSj izkjEHk-&&¼1½ bu fu;eksa dk laf{kIr uke fgekpy izns'k i;kZoj.k] foKku ,oa

izkS|ksfxdh foHkkx] fof/k vf/kdkjh] oxZ&II ¼jktif=r½ vfyfid oxhZ; lsok,a] HkrhZ vkSj izksUufr fu;e] 2017

gSA

¼2½ ;g fu;e jkti=] fgekpy izns'k esa izdkf'kr gksus dh rkjh[k ls izo`Rr gksaxsA

vkns'k }kjk]

gLrk{kfjr@&

vfr0 eq[; lfpoA

&&&&&&&

mikcU/k&^d^

fgekpy izns'k Ik;kZoj.k] foKku ,oa izkS|ksfxdh foHkkx esa fof/k vf/kdkjh] oxZ&II ¼jktif=r½ ds in ds fy,

HkrhZ vkSj izksUufr fu;e

1- in dk uke-&fof/k vf/kdkjhaA

2- inksa dh la[;k- 01 ¼,d½A

3- oxhZdj.k-&oxZ&II ¼jktif=r½A

4- osrueku-&¼I½ fu;fer in/kkjh ds fy, osrueku] is cS.M% `10300&34800@& tek

` 4]400@& xzsM isA

¼II½ lafonk ij fu;qDr deZpkjh ds fy, miyfC/k;ka% LrEHk la[;k 15&d esa fn, x, C;kSjs ds

vuqlkj `14700@& izfrekl A

5- ^p;u^ in vFkok ^vp;u^ in-&ykxw ughaA

6- lh/kh HkrhZ ds fy;s vk;q-& 18 ls 45 o"kZ

8532

jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939

ijUrq lh/ks HkrhZ fd, tkus okys O;fDr;ksa ds fy, Åijh vk;q lhek] rnFkZ ;k lafonk ds vk/kkj ij

fu;qDr fd, x, O;fDr;ksa lfgr] igys ls gh ljdkj dh lsok esa jr vH;kfFZk;ksa dks ykxw ugha gksxh%

ijUrq ;g vkSj fd ;fn rnFkZ ;k lafonk ds vk/kkj ij fu;qDr fd;k x;k vH;FkhZ] bl :i esa

fu;qfDr dh rkjh[k dks vf/kd vk;q dk gks x;k gks] rks og rnFkZ ;k lafonk ds vk/kkj ij fu;qfDr ds

dkj.k fofgr vk;q esa f'kfFkyhdj.k dk ik= ugha gksxk %

ijUrq ;g vkSj fd vuqlwfpr tkfr;ksa@vuqlwfpr tutkfr;ksa@vU; fiNM+s oxksZa rFkk vU; oxksZa ds

O;fDr;ksa ds fy, Åijh vk;q lhek esa mruh gh NwV nh tk,xh] ftruh fgekpy izns'k ljdkj ds lk/kkj.k

;k fo'ks"k vkns'k ¼vkns'kksa½ ds v/khu vuqKs; gS%

ijUrq ;g vkSj Hkh fd leLr ifCyd lsDVj fuxeksa rFkk Lok;Ùk fudk;ksa ds deZpkfj;ksa dks tks ,sls

ifCyd lsDVj] fuxeksa rFkk Lok;Ùk fudk;ksa ds izkjfEHkd xBu ds le;] ifCyd lsDVj fuxeksa@Lok;Ùk

fudk;ksa esa vkesyu ls iwoZ ljdkjh deZpkjh Fks] lh/kh HkrhZ ds fy, vk;q dh ,slh lhek esa gh fj;k;r nh

tk,xh] tSlh ljdkjh deZpkfj;ksa dks vuqKs; gSA ,slh fj;k;r ifCyd lsDVj fuxeksa@Lok;Ùk fudk;ksa ds

,sls deZpkfjo`Un dks vuKs; ugha gksxh tks rRi'pkr~ ,sls fuxeksa@ Lok;Ùk fudk;ksa }kjk fu;qDr fd, x,

Fks@fd, x, gSa vkSj mu ifCyd lsDVj fuxeksa@Lok;Ùk fudk;ksa ds izkjfEHkd xBu ds i'pkr~ ,sls

fuxeksa@Lok;Ùk fudk;ksa dh lsok esa vfUre :i ls vkesfyr fd, x, gSa@fd, x, FksA

fVIi.k%&lh/kh HkrhZ ds fy, vk;q lhek dh x.kuk ml o"kZ ds izFke fnol ls dh tk,xh ftlesa in

¼inksa½ dks vkosnu vkefU=r djus ds fy,] ;FkkfLFkfr] foKkfir fd;k x;k gS ;k fu;kstuky;ksa dks

vf/klwfpr fd;k x;k gSA

7- lh/ks HkrhZ fd, tkus okys O;fDr ¼O;fDr;ksa½ ds fy, visf{kr U;wure 'kSf{kd vkSj vU;

vgZrk,a-&¼d½ vfuok;Z vgZrk-&1- fdlh ekU;rk izkIr fo'ofo|ky; ls fof/k esa Lrkud dh mikf/kA

2- fdlh Hkh ljdkjh@v/kZ ljdkjh [email protected]@xSj ljdkjh laxBukas@izkbosV lSDVj

vkfn esa dk;Z djrs le; fof/kd ekeyksa esa de ls de ikap o"kZ dk vuqHkoA

¼[k½ okaNuh; vgZrk-&1- i;kZoj.k fof/k rFkk eqdn~nesckth ¼fyfVxs'ku½ esa vuqHko j[kus okys

vH;kfFkZ;ksa dks vf/keku fn;k tk,xkA

2- fgekpy izns'k dh :f<+;ksa] jhfr;ksa vkSj cksfy;ksa dk Kku vkSj izns'k esa fo|eku fof'k"V

n'kkvksa esa fu;qfDr ds fy, mi;qDrrkA

8- lh/ks HkrhZ fd, tkus okys O;fDr ¼O;fDr;ksa½ ds fy, fofgr vk;q vkSj 'kSf{kd vgZrk,a izksUufr

O;fDr ¼O;fDr;ksa½ dh n'kk esa ykxw gksaxh ;k ugha-&vk;q% Ykkxw ughaA

'kSf{kd vgZrk% ykxw ughaA

9- ifjoh{kk dh vof/k] ;fn dksbZ gks-&¼d½ nks o"kZ] ftldk ,d o"kZ ls vf/kd ,slh vkSj vof/k ds

fy, foLrkj fd;k tk ldsxk tSlk fd l{ke izkf/kdkjh fo'ks"k ifjfLFkfr;ksa esa vkSj dkj.kksa dks fyf[kr esa

vfHkfyf[kr djds vkns'k nsaA

¼[k½ lafonk ds vk/kkj ij] lsok/k`fr ds vk/kkj ij fu;qfDr ij] vf/kof"kZrk ds i'pkr~ iqufuZ;kstu

ij vkSj vkesyu ij dksbZ ifjoh{kk ugha gksxhA

10- HkrhZ dh i)fr-&&HkrhZ lh/kh gksxh ;k izksUufr ;k lSd.MeSaV ;k LFkkukUrj.k }kjk vkSj fofHkUu

i)fr;ksa }kjk Hkjs tkus okys in ¼inksa½ dh izfr'krrk-&'krizfr'kr lh/kh HkrhZ }kjk] fu;fer vk/kkj ij ;k

lafonk ds vk/kkj ij HkrhZ }kjkA

8533

jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939

11- [email protected]@LFkkukUrj.k }kjk HkrhZ dh n'kk esa] Jsf.k;ka ¼xzsM½ ftuls

[email protected]@LFkkukUrj.k fd;k tk,xk-&ykxw ughaA

12- ;fn foHkkxh; izksUufr lfefr fo|eku gks] rks mldh lajpuk-&¼d½ foHkkxh; izksUufr

lfefr%&& ykxw ughaA

¼[k½ foHkkxh; LFkk;hdj.k lfefr%&& tSlh ljdkj }kjk le;&le; ij xfBr dh tk,A

13- HkrhZ djus esa fdu ifjfLFkfr;ksa esa fgekpy izns'k yksd lsok vk;ksx ls ijke'kZ fd;k tk,xk-

&tSlk fd fof/k }kjk visf{kr gksA

14- lh/kh HkrhZ ds fy, vfuok;Z vis{kk-&fdlh lsok ;k in ij fu;qfDr ds fy, vH;kFkhZ

dk Hkkjr dk ukxfjd gksuk vfuok;Z gSA

15- lh/kh HkrhZ }kjk in ij fu;qfDr ds fy, p;u-&lh/kh HkrhZ ds ekeysa esa in ij fu;qfDr ds

fy, p;u] lk{kkRdkj@O;fDrRo ijh{k.k ds vk/kkj ij fd;k tk,xk ;k ;fn ;FkkfLFkfr] fgekpy izns'k

yksd lsok vk;ksx ;k vU; HkrhZ vfHkdj.k@izkf/kdj.k ,slk djuk vko';d ;k lehphu le>s] rks iwoZ esa

yh xbZ NaVuh ijh{kk ¼oLrqfu"B izdkj dh½@fyf[kr ijh{kk ;k O;kogkfjd ijh{kk;k 'kkjhfjd ijh{k.k ds

vuqlkj lk{kkRdkj@O;fDrRo ijh{k.k ds vk/kkj ij fd;k tk,xk] ftldk Lrj@ikB~;Øe ;kfn] ;FkkfLFkfr]

vk;ksx@vU; HkrhZ vfHkdj.k@izkf/kdj.k }kjk vo/kkfjr fd;k tk,xkA

15&d lafonk fu;qfDr }kjk in ij fu;qfDr ds fy, p;u-&bu fu;eksa esa fdlh ckr ds gksrs gq,

Hkh in ij lafonk fu;qfDr;ka uhps fn, x, fucU/kuksa vkSj “krksZa ds v/;/khu dh tk,axh%

¼I½ ladYiuk-&¼d½ bl ikWfylh ds v/khu fgekpy izns'k Ik;kZoj.k] foKku ,oa izkS|ksfxdh foHkkx esa

fof/k vf/kdkjh dks lafonk ds vk/kkj ij izkjEHk esa ,d o"kZ ds fy, yxk;k tk,xk] ftls o"kkZuqo"kZ vk/kkj ij

vkxs c<+k;k tk ldsxk%

ijUrq lafonk vof/k esa o"kkZuqo"kZ vk/kkj ij [email protected] ds fy, lEc) foHkkxk/;{k ;g

izek.k i= tkjh djsxk fd lafonk ij fu;qDr O;fDr dh lsok vkSj vkpj.k o"kZ ds nkSjku larks"ktud jgk gS

vkSj dsoy rHkh mldh lafonk dh vof/k uohd`r@foLrkfjr dh tk,xhA

¼[k½ in dk fgekpy izns'k yksd lsok vk;ksx ds dk;Z{ks= esa vkuk-&iz/kku lfpo@ lfpo

¼Ik;kZoj.k] foKku ,oa izkS|ksfxdh½] fgekpy izns'k fjDr inksa dks lafonk ds vk/kkj ij Hkjus ds fy, ljdkj

dk vuqeksnu izkIr djus ds i'pkr~ v/;is{kk dks lEc) HkrhZ vfHkdj.k] vFkkZr~ fgekpy izns'k yksd lsok

vk;ksx ds le{k j[ksxkA

¼x½ p;u] bu fu;eksa esa fofgr ik=rk 'krksZa ds vuqlkj fd;k tk,xkA

¼II½ lafonkRed miyfC/k;ka-&lafonk ds vk/kkj ij fu;qDr fof/k vf/kdkjh dks `14]700@& dh

lesfdr fu;r lafonkRed jde ¼tks in ds is cSaM dk U;wure tek xzsM is ds cjkcj gksxh½ izfrekl lanRr

dh tk,xhA ;fn lafonk esa ,d o’kZ ls vf/kd dh c<+kSrjh dh tkrh gS] rks i'pkr~orhZ o’kZ@o’kksZa ds fy,

lafonkRed miyfC/k;ksa esa ` 441@& dh jde ¼in ds is caSM dk U;wure tek xzsM is dk 3 izfr'kr½

okf’kZd o`f) ds :i esa vuqKkr dh tk,xhA

¼III½ fu;qfDr@vuq'kklfud izkf/kdkjh-&lfpo ¼Ik;kZoj.k] foKku ,oa izkS|ksfxdh½] fgekpy izns'k

ljdkj fu;qfDr vkSj vuq'kklu izkf/kdkjh gksxkA

8534

jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939

¼IV½ p;u izfØ;k-&lafonk fu;qfDr dh n'kk esa in ij fu;qfDr ds fy, p;u]

lk{kkRdkj@O;fDrRo ijh{k.k ds vk/kkj ij fd;k tk,xk ;k ;fn ,slk djuk vko';d ;k lehphu le>k

tk,] rks iwoZ esa yh xbZ NaVuh ijh{kk ¼oLrqfu"B] izdkj dh½@fyf[kr ijh{kk ;k O;kogkfjd ijh{kk ;k

'kkjhfjd ijh{k.k ds vuqlkj lk{kkRdkj@O;fDrRo ds vk/kkj ij fd;k tk,xk] ftldk Lrj@ikB~;Øe vkfn

lEc) HkrhZ vfHkdj.k vFkkZr~ fgekpy izns'k yksd lsok vk;ksx }kjk vo/kkfjr fd;k tk,xkA

¼V½ lafonkRed fu;qfDr ds fy, p;u lfefr-&tSlh lEc) HkrhZ vfHkdj.k vFkkZr~ fgekpy izns'k

yksd lsok vk;ksx }kjk le;&le; ij xfBr dh tk,A

¼VI½ djkj-&vH;kFkhZ dks] p;u ds i'pkr~ bu fu;eksa ls layXu mikcU/k&**[k** ds vuqlkj djkj

gLrk{kfjr djuk gksxkA

¼VII½ fucU/ku ,oa 'krsZa-&¼d½ lfa onk ds vk/kkj ij fu;qDr O;fDr dks `14]700@& dh lesfdr

fu;r lafonkRed jde ¼tks is caSM dk U;wure tek xzsM is ds cjkcj gksxh½ izfrekl lanRr dh tk,xhA

lafonk ij fu;qDr O;fDr vkxs c<+k, x, o’kZ@o’kksZa ds fy, lafonkRed jde esa `441@& ¼in is

caSM dk U;wure tek xzsM is dk rhu izfr'kr½ dh o`f) dk gdnkj gksxk vkSj vU; dksbZ lgc) izlqfo/kk,]a

tSls ofj’B@p;u osrueku bR;kfn ugha fn;k tk,xkA

¼[k½ lafonk ij fu;qDr O;fDr dh lsok iw.kZr;k vLFkk;h vk/kkj ij gksxhA ;fn lafonk ij fu;qDr

O;fDr dk dk;[email protected] Bhd ugha ik;k tkrk gS] rks fu;qfDr i;Zoflr ¼lekIr½ fd, tkus ds fy,

nk;h gksxhA

¼x½ lafonk ij fu;qDr O;fDr ,d ekl dh lsok iwjh djus ds i'pkr ,d fnu ds vkdfLed

vodk'k dk gdnkj gksxkA rFkkfi lafonk ij fu;qDr deZpkjh 135 fnu ds izlwfr vodk'k] 10 fnu ds

fpfdRlk vodk'k vkSj 5 fnu ds fo'ks"k vodk'k ds fy, Hkh gdnkj gksxk@gksxhA

lafonk ij fu;qDr efgyk deZpkjh iwjh lsok ds nkSjku xHkZikr gks tkus lfgr xHkZikr djkus dh

n'kk esa] izkf/kd`r ljdkjh fpfdRlk vf/kdkjh }kjk tkjh fpfdRlk izek.k i= izLrqr djus ij iSarkfyl fnu

ls vf/kd izlwfr vodk'k ¼thfor cPpksa dh la[;k dk fopkj fd, fcuk½ ds fy, Hkh gdnkj gksxhA

og fpfdRlk izfriwfrZ vkSj ,y0Vh0lh0 vkfn ds fy, Hkh gdnkj ugha gksxk@gksxhA lafonk ij

fu;qDr O;fDr dks mijksDr ds flok; vU; fdlh izdkj dk dksbZ vodk'k vuqKkr ugha gksxk %

ijUrq vuqi;qDr vkdfLed vodk'k o fpfdRlk vodk'k ,d dSysaMj o’kZ rd lafpr fd;k tk

ldsxk vkSj vkxkeh dSysaMj o’kZ ds fy, vxzuhr ugha fd;k tk,xkA

¼?k½ fu;U=d vf/kdkjh ds vuqeksnu ds fcuk dÙkZO; ¼M~;wVh½ ls vuf/kd`r vuqifLFkfr ls Lor% gh

lafonk dk i;kZolku ¼lekiu½ gks tk;sxk] rFkkfi vkiokfnd ekeyksa esa tgka ij fpfdRlk vk/kkj ij dÙkZO;

ls vuf/kd`r vuqifLFkfr ds gkykr lafonk ij fu;qDr O;fDr ds fu;U=.k ls ckgj gks rks mlds

fu;ferhdj.k ds ekeys esa fopkj djrs le; ,slh vof/k vioftZr ugha dh tk,xh] ijUrq in/kkjh dks bl

ckor le; ij fu;U=.k vf/kdkjh dks lwfpr djuk gksxkA rFkkfi] lafonk ij fu;qDr O;fDr dÙkZO; ls

vuqifLFkfr dh ,slh vof/k ds fy, lafonkRed jde dk gdnkj ugha gksxk%

ijUrq mls ljdkj ds izpfyr vuqns'kksa ds vuqlkj fpfdRlk vf/kdkjh }kjk tkjh chekjh@vkjksX;

dk izek.k&i= izLrqr djuk gksxkA

8535

jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939

¼³½ lafonk ij fu;qDr in/kkjh ftlus rSukrh ds ,d LFkku ij rhu o"kZ dk lsokdky iw.kZ dj

fy;k gS] vko';drk ds vk/kkj ij LFkkukUrj.k ds fy, ik= gksxk] tgka Hkh iz'kklfud vk/kkj ij ,slk

djuk visf{kr gksA

¼p½ p;fur vH;kFkhZ dks ljdkjh@jftLVªhd`r fpfdRlk O;olk;h ls viuk vkjksX; izek.k&i=

izLrqr djuk gksxkA ckjg lIrkg ls vf/kd xHkZorh efgyk vH;kFkhZ izlo gksus rd vLFkk;h rkSj ij

vuqi;qDr cuh jgsxhA efgyk vH;FkhZ dk fdlh izkf/kd`r fpfdRlk vf/kdkjh@O;olk;h }kjk mi;qDrrk ds

fy, iqu% ijh{k.k fd;k tk,xkA

¼N½ lafonk ij fu;qDr O;fDr dk] ;fn vius inh; drZO;ksa ds lEcU/k esa nkSjs ij tkuk visf{kr

gks] rks og mlh nj ij] tSlh fu;fer izfrLFkkuh deZpkfj;ksa dks osrueku ds U;wure ij ykxw gS] ;k=k

HkRrs@nSfud HkRrs dk gdnkj gksxk@gksxhA

¼t½ fu;fer deZpkfj;ksa dh n'kk esa] ;Fkk ykxw lsok fu;eksa ds micU/k tSls ,Q0vkj0&,l0vkj0]

NqV~Vh fu;e] lk/kkj.k Hkfo’; fuf/k fu;e] isa'ku fu;e rFkk vkpj.k fu;e vkfn lafonk ij fu;qDr

O;fDr;ksa dh n'kk esa ykxw ugha gksaxs A os bl LrEHk esa ;Fkkof.kZr miyfC/k;ksa vkfn ds fy, gdnkj gksaxs A

16- vkj{k.k-&lsok esa fu;qfDr] fgekpy izns'k ljdkj }kjk le;&le; ij vuqlwfpr

tkfr;ksa@vuqlwfpr tutkfr;ksa@vU; fiNMs+ oxksZa vkSj vU; izoxksZa ds O;fDr;ksa ds fy, lsok esa vkj{k.k dh

ckcr tkjh fd, x, vuqns'kksa ds v/khu gksxhA

17- foHkkxh; ijh{kk-&lsok esa izR;sd lnL; dks le;&le; ij ;Fkk la'kksf/kr fgekpy izns'k

foHkkxh; ijh{kk fu;e] 1997 esa ;Fkk fofgr foHkkxh; ijh{kk ikl djuh gksxhA

18- f'kfFky djus dh 'kfDr-&Tkgka jkT; ljdkj dh ;g jk; gks fd ,slk djuk vko';d ;k

lehphu gS] ogka og dkj.kksa dks fyf[kr esa vfHkfyf[kr djds vkSj fgekpy izns'k yksd lsok vk;ksx ds

ijke'kZ ls] vkns'k }kjk] bu fu;eksa ds fdUgha micU/kksa dks fdlh oxZ ;k O;fDr;ksa ds izoxZ ;k inksa dh ckor

f'kfFky dj ldsxhA

&&&&&&&&

mikcU/k&**[k**

fof/k vf/kdkjh vkSj fgekpy izns'k ljdkj ds e/; lfpo ¼Ik;kZoj.k] foKku ,oa izkS|ksfxdh] fgekpy izns'k

ljdkj ds ek/;e ls fu"ikfnr dh tkus okyh lafonk@djkj dk izk#i

;g djkj Jh@Jherh---------------------------------------------------------------iq=@iq=h Jh-----------------------------------------------------------

fuoklh------------------------------------------------------------------------------------------- lafonk ij fu;qDr O;fDr ¼ftls blesa blds i'pkr~

*izFke i{kdkj* dgk x;k gS½] vkSj fgekpy izns'k ds jkT;iky ds e/;] lfpo ¼Ik;kZoj.k] foKku ,oa

izkS|ksfxdh½] fgekpy izns'k ljdkj ¼ftls blesa blds i'pkr~ *f}rh; i{kdkj* dgk x;k gS½ ds ek/;e ls

vkt rkjh[k-----------------------dks fd;k x;kA

*f}rh; i{kdkj* us mijksDr *izFke i{kdkj* dks yxk;k gS vkSj *izFke i{kdkj* us fof/k vf/kdkjh ds

:i esa lafonk ds vk/kkj ij fuEufyf[kr fucU/ku vkSj “krksZa ij lsok djus ds fy, lgefr nh gS%&&

1- ;g fd izFke i{kdkj fof/k vf/kdkjh ds :i esa----------------------------------------------ls izkjEHk gksus vkSj -------

-----dks lekIr gksus okys fnu rd] ,d o’kZ dh vof/k ds fy, f}rh; i{kdkj dh lsok esa

jgsxkA ;g fofufuZ’V :i ls mfYyf[kr fd;k x;k gS vkSj nksuksa i{kdkjksa }kjk djkj ik;k

8536

jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939

x;k gS fd izFke i{kdkj dh f}rh; i{kdkj ds lkFk lafonk vkf[kjh dk;Z fnol dks vFkkZr~ ----

-------------------------rkjh[k dks Lo;aeso gh i;Zoflr ¼lekIr½ le>h tk,xh vkSj lwpuk uksfVl

vko';d ugha gksxk%

ijUrq o’kkZuqo’kZ vk/kkj ij lafonk dh vof/k esa c<[email protected] ds fy, lEc) foHkkxk/;{k

;g izek.k&i= tkjh djsxk fd lafonk ij fu;qDr O;fDr dh lsok vkSj vkpj.k o’kZ ds nkSjku

lUrks’ktud jgk gS vkSj dsoy rHkh mldh lafonk dh vof/k uohd`r@foLrkfjr dh tk,xhA

2- izFke i{kdkj dh lafonkRed jde ` 14]700@& izfrekl gksxhA

3- izFke i{kdkj dh lsok iw.kZr;k vLFkkbZ vk/kkj ij gksxhA ;fn lafonk ij fu;qDr O;fDr dk

dk;[email protected] Bhd ugha ik;k tkrk gS ;k ;fn fu;fer in/kkjh ml fjfDr ds fo:)

fu;qDr@rSukr dj fn;k tkrk gS] ftlds fy, izFke i{kdkj dks lafonk ij yxk;k x;k gS

rks fu;qfDr i;kZoflr ¼lekIr½ fd, tkus ds fy, nk;h gksxhA

4- lafonk ij fu;qDr fof/k vf/kdkjh ,d ekl dh lsok iwjh djus ds i'pkr~ ,d fnu ds

vkdfLed vodk'k dk gdnkj gksxkA rFkkfi] lafonk ij fu;qDr deZpkjh 135 fnu ds izlwfr

vodk'k] 10 fnu ds fpfdRlk vodk'k vkSj 5 fnu ds fo'ks"k vodk'k ds fy, Hkh gdnkj

gksxk@gksxhA lafonk ij fu;qDr efgyk deZpkjh iwjh lsok ds nkSjku xHkZikr gks tkus lfgr

xHkZikr djkus dh n'kk esa] izkf/kd`r ljdkjh fpfdRlk vf/kdkjh }kjk tkjh fpfdRlk izek.k

i= izLrqr djus ij iSarkfyl fnu ls vf/kd izlwfr vodk'kh ¼thfor cPpksa dh la[;k dk

fopkj fd, fcuk½ ds fy, Hkh gdnkj gksxhA og fpfdRlk izfriwfrZ vkSj ,y0Vh0lh0 bR;kfn

ds fy, Hkh gdnkj ugha gksxk@gksxhA lafonkRed fof/k vf/kdkjh dks mijksDr ds flok, fdlh

Hkh izdkj dk vU; dksbZ vodk'k vuqKkr ugha gksxk%

ijUrq vuqi;qDr vkdfLed vodk'k] fpfdRlk vodk'k vkSj fo'ks"k vodk'k ,d dSys.Mj o"kZ

rd lafpr fd;k tk ldsxk vkSj vkxkeh dSy.Mj o"kZ ds fy, vxzuhr ugha fd;k tk,xkA

5- fu;U=d vf/kdkjh ds vuqeksnu ds fcuk dÙkZO; ls vuf/kd`r vuqifLFkfr ls Lor% gh lafonk

dk i;kZolku ¼lekiu½ gks tk,xkA rFkkfi viokfnd ekeyksa esa] tgka ij fpfdRlk vk/kkj ij

lafonk ij fu;qDr O;fDr ds fu;U=.k ls ckgj gks rks ,slh vof/k mlds fu;fefrdj.k ds

ekeys esa fopkj djrs le; vioftZr ugha dh tk,xh] ijUrq in/kkjh dks bl ckcr le; ij

fu;U=.k izkf/kdkjh dks lwfpr djuk gksxkA rFkkfi lafonk ij fu;qDr O;fDr dÙkZO; ls

vuqifLFkfr dh vof/k ds fy, lafonkRed jde dk gdnkj ugha gksxkA

ijUrq mls ljdkj ls izpfyr vuqns'kksa ds vuqlkj fpfdRlk vf/kdkjh }kjk tkjh

chekjh@vkjksX; dk izek.ki= izLrqr djuk gksxkA

6- lafonk ij fu;qDr in/kkjh ftlus rSukrh ds ,d LFkku ij rhu o"kZ dk lsokdky iw.kZ dj

fy;k gS] vko';drk ds vk/kkj ij tgka Hkh iz'kklfud vk/kkj ij ,slk djuk visf{kr gks]

LFkkukUrj.k gsrq ik= gksxkA

7- p;fur vH;FkhZ dks ljdkjh@jftLVªhd`r fpfdRlk O;olk;h ls viuk vkjksX; izek.k&i=

izLrqr djuk gksxkA efgyk vH;fFkZ;ksa dh n”kk esa ckjg lIrkg ls vf/kd dh xHkkZoLFkk izlo

gksus rd mls vLFkk;h rkSj ij vuqi;qDr cuk nsxhA ,slh efgyk vH;FkhZ dk fdlh izkf/kd`r

fpfdRlk vf/kdkjh@O;olk;h }kjk mi;qDrrk ds fy, iqu% ijh{k.k fd;k tkuk pkfg,A

8- lafonk ij fu;qDr O;fDr dk] ;fn vius inh; drZO;ksa ds lEcU/k esa nkSjs ij tkuk visf{kr

gks] rks og mlh nj ij] tSlh fu;fer izfrLFkkuh deZpkjh dks osrueku ds U;wure ij ykxw

gS] ;k=k HkRrs@nSfud HkRrs dk gdnkj gksxk@gksxhA

8537

jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939

9- lafonkRed deZpkjh ¼deZpkfj;ksa½ dh deZpkjh lkewfgd thou chek ;kstuk ds lkFk&lkFk

bZ0ih0,Q0@th0ih0,Q- Hkh ykxw ugha gksxkA

blds lk{;Lo:i izFke i{kdkj vkSj f}rh; i{kdkj us lkf{k;ksa dh mifLFkfr esa blesa loZizFke

mfYyf[kr rkjh[k dks vius&vius gLrk{kj dj fn, gSaA

lkf{k;ksa dh mifLFkfr esa %

1- ------------------------------------------------------------------------------

-------------------------------------------------------------------------------

--------------------------------------------------------------------------------

¼uke o iwjk irk½

¼izFke i{kdkj ds gLrk{kj½

2- ------------------------------------------------------------------------------

-------------------------------------------------------------------------------

--------------------------------------------------------------------------------

¼uke o iwjk irk½

lkf{k;ksa dh mifLFkfr esa%

1- ------------------------------------------------------------------------------

-------------------------------------------------------------------------------

--------------------------------------------------------------------------------

¼uke o iwjk irk½

2- ------------------------------------------------------------------------------

-------------------------------------------------------------------------------

--------------------------------------------------------------------------------

¼uke o iwjk irk½

¼f}rh; i{kdkj ds gLrk{kj½

____________

[Autoritative English Test of this Department Notification No. STE-B(3)-1/2016 dated………. as

required under clause (3) of Article 348 of the Constitution of India].

ENVIRONMENT, SCENCE & TECHNOLOGY DEPARTMENT

NOTIFICATION

Shimla-171 002, the 1st November, 2017

No.STE-B(3)-1/2016.—In exercise of the powers conferred by proviso of article, 309 of the

Constitution of India, the Governor, Himachal Pradesh in consultation with the Himachal Pradesh

Public Service Commission, is pleased to make the Recruitment & Promotion Rules for the post of

Law Officer, Class-II (Gazetted) in the Department of Environment, Science & Technology,

Himachal Pradesh as per annexure-'A' attached to this notification, namely.—

8538

jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939

1.

Short title and commencement.—(1) These rules may be called the Himachal

Pradesh, Department of Environment, Science & Technology, Law Officer, Class-II (Gazetted)

recruitment and Promotion Rules, 2017.

(2) These rules shall come into force from the date of publication in the Rajpatra,

Himachal Pradesh.

By order,

Sd/-

Addl. Chief Secretary (Env., Sci. & Tech.).

_____________

ANNEXURE-A

RECRUITMENT AND PROMOTION RULES FOR THE POST OF LAW OFFICER,

CLASS-II (GAZETTED) IN THE DEPARTMENT OF ENVIRONMENT, SCIENCE &

TECHNOLOGY, HIMACHAL PRADESH

1.

Name of the Post.—Law Officer

2.

Number of Posts.—01 (One)

3.

Classification.—Class-II (Gazetted)

4.

Scale of Pay.—(i) Pay Band for regular incumbents:— ` 10300-34800+ ` 4400

Grade Pay.

(ii) Emoluments for contract employee:— `` 14,700/- as per details given in col.15-A.

5.

Whether ‘Selection’ Post or ‘Non-Selection’ post’.— Not Applicable

6.

Age for direct recruitment.—Between 18 to 45 years.

Provided that the upper age limit for direct recruits will not be applicable to the candidates

already in service of the Government including those who have been appointed on adhoc or on

contract basis:

Provided further that if a candidate appointed on adhoc basis or on contract basis had

become over-age on the date he/she was appointed as such he/she shall not be eligible for any

relaxation in the prescribed age-limit by virtue of his/her such adhoc or contract appointment:

Provided further that upper age-limit is relaxable for Scheduled Caste/Scheduled

Tribes/Other categories of persons to the extent permissible under the general or special order (s)

of the Himachal Pradesh Government:

Provided further that the employees of all the Public Sector Corporations and Autonomous

Bodies who happened to be Government servants before absorption in Public Sector

Corporations/Autonomous

Bodies

at

the

time

of

initial

constitutions

of

such

Corporations/Autonomous Bodies shall be allowed age concession in direct recruitment

as admissible to Government servants. This concession will not, however, be admissible to such

staff of the Public Sector Corporations/Corporations/Autonomous Bodies who were/are

8539

jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939

subsequently appointed by such Corporations/ Autonomous Bodies and who are/were finally

absorbed in the service of such Corporations/Autonomous Bodies after initial constitution of the

Public Sector Corporations/Autonomous Bodies.

Note:—Age limit for direct recruitment will be reckoned on the first day of the year in

which the post(s) is/are advertised for inviting applications or notified to the Employment

Exchanges, as the case may be.

7.

Minimum educational and other qualifications required for direct

recruit(s).—(a) Essential Qualification:—(i) Bachelor’s Degree in Law from a recognized

University.

(ii) Minimum 5 years experience in legal matters while working in a Government/

Semi Government Institution/ Agencies/NGOs/Private Sector etc.

(b) Desirable Qualification:—(i) Preference will be given to the candidates having

experience in Environmental Law and Litigation.

(ii) Knowledge of customs, manners & dialects of Himachal Pradesh and suitability for

appointment in the peculiar conditions prevailing in the Pradesh.

8.

Whether age and educational qualifications prescribed for direct recruits will

apply in the case of the promote(s) ?.—Age:— Not Applicable.

Educational Qualification:— Not Applicable.

9.

Period of probation, if any.—(a) Two years subject to such further extension for a

period not exceeding one year as may be ordered by the competent authority in special

circumstances and reasons to be recorded in writing.

(b) No probation in case of appointment on contract basis, tenure basis, re-employment

after superannuation and absorption.

10. Method

of

recruitment–whether

by

direct

recruitment

or

by

promotion/secondment/transf er and the percentage of post to be filled in by various

methods.—100% by direct recruitment on regular basis or by recruitment on contract

basis as the case may be.

11. In case of recruitment by promotion/secondment/ transfer, grade(s) from which

promotion/secondment, transfer is to be made.—Not Applicable.

12. If a Departmental Promotion Committee exists, what is its composition?.—( a)

Departmental Promotion Committee:—Not applicable

(b) Departmental Confirmation Committee:—As may be constituted by the Government

from time to time.

13.

Circumstances under which the Himachal Pradesh Public Service Commission

(HPPSC) is to be consulted in making recruitment.—As required under the law.

14. Essential requirement for a direct recruitment.—A candidate for appointment to

any service or post must be a citizen of India.

8540

jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939

15. Selection for appointment to the post by direct recruitment.—Selection for

appointment to the post in the case of direct recruitment shall be made on the basis of

interview/personality test, if the Himachal Pradesh Public Service Commission or other recruiting

agency/authority, as the case may be, so consider necessary or expedient on the basis of

interview/personality test preceded by a screening test (objectives type)/written test, practical test

or physical test, the standard/syllabus, etc. of which, will be determined by the

Commission/other recruiting agency/authority as the case may be.

15.A Selection for appointment to the post by Contract appointment.—

Notwithstanding anything contained in these rules, contract appointment to the post will be made

subject to the terms and conditions given below:

(I)

CONCEPT:—(a) Under this policy, the Law Officer in the Department of

Environment, Science & Technology, H.P. will be engaged on contract basis initially for one

year which may be extendable on year to year basis:

Provided that for extension/renewal of contract period on year to year basis the concerned

HOD shall issue a certificate that the service and conduct of the contract appointee is satisfactory

during the year and only then his period of contract is to be renewed/extended.

(b) POST

FALLS

WITHIN

THE

PURVIEW

OF

HP

PSC:—The

Pr.

Secretary/Secretary (Environment, Science & Technology) to the Govt. of H.P. after obtaining

the approval of the Government to fill up the vacant posts on contract basis will place the

requisition with the concerned recruiting agency i.e. Himachal Pradesh Public Service

Commission.

(c) The selection will be made in accordance with the eligibility conditions prescribed

in these rules.

(II) CONTRACTUAL EMOLUMENTS:—The Law Officer appointed on contract

basis will be paid consolidated fixed contractual amount @ ` 14,700/- P.M. (which shall be equal

to minimum of Pay band plus grade pay). An amount of ` 441/- (3% of the minimum of Pay band

+ Grade Pay of the post) as annual increase in contractual emoluments for the subsequent year(s)

will be allowed if contract is extended beyond one year.

(III) APPOINTING/DISCIPLIANRY

AUTHORITY:—The

Pr.

Secretary/Secretary

(Environment, Science & Technology) to the Govt. of H.P. will be appointing and disciplinary

authority.

(IV) SELECTION PROCESS:—Selection for appointment to the post in the case of

Contract Appointment will be made on the basis of interview/personality test or if considered

necessary or expedient on the basis of interview/personality test preceded by a screening test

(objective test)/written test or practical test or physical test, the standard syllabus etc. of which

will be determined by the concerned recruitment agency i.e. Himachal Pradesh Public Service

Commission.

(V) COMMITTEE FOR SELECTION OF CONTRACTUAL APPOINTMENTS:—

As may be constituted by the concerned recruiting agency i.e. the Himachal Pradesh

Public Service Commission from time to time.

(VI) AGREEMENT:—After selection of a candidate he/she shall sign an agreement as

per “Annexure-B” appended to these rules.

8541

jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939

(VIII) TERMS AND CONDITIONS:—(a) The Contractual appointee will be paid fixed

contractual amount @ ` 14,700/- per month (which shall be equal to minimum of Pay band plus

Grade pay). The Contract Appointee will be entitled for increase in contractual amount @ ` 441/-

(3% of the minimum of Pay band + grade Pay of the post) for further extended years and no

other allied benefits such as senior/selection scales etc. will be given.

(b) The service of the Contract Appointee will be purely on temporary basis. The

appointment is liable to be terminated in case the performance/ conduct of the contract appointee

is not found satisfactory.

(c) The contract appointee will be entitled for one day’s casual leave after putting one

month service. However, the contract employee will also be entitled for 135 days Maternity

Leave, 10 days Medical Leave and 5 days special leave. A female contract appointee shall also

be entitled for maternity leave not exceeding 45 days (irrespective of the number of surviving

children) during the entire service, in case of miscarriage including abortion, on production of

medical certificate issued by the authorized Government Medical Officer. He/she shall not be

entitled for Medical re- imbursement and LTC etc. No leave of any other kind except above is

admissible to the contract appointee:

Provided that the un-availed Casual Leave and Medical Leave and Special Leave can be

accumulated up to the Calendar Year and will not be carried forward for the next Calendar Year.

(d) Unauthorized absence from the duty without the approval of the controlling officer

shall automatically lead to the termination of the contract. However, in exceptional cases where

the circumstances for un- authorized absence from duty were beyond his/her control on medical

grounds, such period shall not be excluded while considering his/her case for regularization but

the incumbent shall have to intimate the controlling authority in this regard well in time.

However, the contract appointee shall not be entitled for contractual amount for this period of

absence from duty.

Provided that he/she shall submit the certificate of illness/fitness issued by the Medical

Officer, as per prevailing instructions of the Government.

(e) An official appointed on contract basis who has completed three years tenure at one

place of posting will be eligible for transfer on need based basis wherever required on

administrative grounds.

(f)

Selected candidate will have to submit a certificate of his/her fitness from a

Government/ Registered Medical Practitioner. Women candidate pregnant beyond 12 weeks will

stand temporarily unfit till the confinement is over. The women candidate will be re-examined

for the fitness from an authorized Medical Officer/Practitioner.

(g) Contract appointee will be entitled to TA/DA if required to go on tour in connection

with his/her official duties at the same rate as applicable to regular counterpart officials at the

minimum of pay scale;

(h) Provisions of service rules like FR SR, Leave Rules, GPF Rules, Pension Rules &

Conduct Rules etc. as are applicable in case of regular employees will not be applicable in case

of contract appointees. Employees Group Insurance Scheme as well as EPF/GPF will also not

be applicable to contract appointee(s).

16. Reservation.—The appointment to the service shall be subject to orders regarding

reservation in the service for Scheduled Castes/Scheduled Tribes/Other Backward Classes/Other

categories of persons issued by the Himachal Pradesh Government from time to time.

8542

jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939

17. Departmental Examination.—Every member of the Service shall pass a

Departmental Examination as prescribed in the H.P Departmental Examination Rule,1997

as amended from time to time.

18.

Powers to relax.—Where the State Government is of the opinion that it is

necessary or expedient to do so, it may, by order for reasons to be recorded in writing and in

consultation with the Himachal Pradesh Public Service Commission relax any of the

provision(s) of these rules with respect to any class or category of person(s) or post(s).

____________

ANNEXURE –B

FORM OF CONTRACT/AGREEMENT TO BE EXECUTED BETWEEN THE LAW

OFFICER AND THE GOVERNMENT OF HIMACHAL PRADESH THROUGH THE

PR. SECRETARY/SECRETARY (ENVIRONMENT, SCIENCE & TECHNOLOGY) TO

THE GOVT. OF HIMACHAL PRADESH.

This agreement is made on this………..….day of….………….………in the year

………………….……..between Sh./Smt…………….………. S/o/D/o …………………………….

R/o………………. ……… contract appointee, (hereinafter called the FIRST PARTY) AND the

Governor of Himachal Pradesh through Pr. Secretary/Secretary (Environment, Science &

Technology) to the Govt. of Himachal Pradesh (hereinafter “SECOND PARTY”).

Whereas, the SECOND PARTY has engaged the aforesaid FIRST PARTY and the FIRST

PARTY has agreed to serve as a Law Officer on contract basis on the following terms and

conditions:—

1.

That the FIRST PARTY shall remain in the service of the SECOND PARTY as a Law

Officer for a period of one year commencing on day of ………………….and

ending on the day of …………………It is specifically mentioned and agreed upon

by both the parties that the contract of the FIRST PARTY with SECOND PARTY

shall ipso-facto stand terminated on the last working day i.e. on ………and

information notice shall not be necessary:

Provided that for further extension/ renewal of contract period the HOD shall

issue a certificate that the service and conduct of the contract appointee was

satisfactory during the year and only then the period of contract is to be renewed/

extended.

2.

That the contractual amount of the FIRST PARTY will be K14,700/- per month.

3.

That the services of FIRST PARTY will be purely on temporary basis. The

appointment is liable to be terminated in case the performance/ conduct of the

contract appointee is not found satisfactory.

4.

The Contractual appointee will be entitled for one day’s casual leave after putting

one month service. However, the contract employee will also be entitled for 135

days Maternity Leave, 10 days Medical Leave and 5 days special leave. A female

contract appointee shall also be entitled for maternity leave not exceeding 45 days

(irrespective of the number of surviving children) during the entire service, in case

of miscarriage including abortion, on production of medical certificate issued by the

8543

jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939

authorized Government Medical Officer. He/she shall not be entitled for Medical Re-

imbursement and LTC etc. No leave of any other kind except above is admissible to

the contract appointee:

Provided that the un-availed Casual Leave and Medical Leave can be accumulated up

to the Calendar Year and will not be carried forward for the next Calendar Year.

5.

Unauthorized absence from the duty without the approval of the controlling officer

shall automatically lead to the termination of the contract. However, in exceptional

cases where the circumstances for un-authorized absence from duty were beyond

his/her control on medical grounds, such period shall not be excluded while

considering his/her case for regularization but the incumbent shall have to intimate

the controlling authority in this regard well in time. However, the contract appointee

shall not be entitled for contractual amount for this period of absence from duty:

Provided that he/she shall submit the certificate of illness/fitness issued by the

Medical Officer, as per prevailing instructions of the Government:

6.

An official appointed on contract basis who have completed three years tenure at

one place of posting will be eligible for transfer on need based basis wherever

required on administrative grounds.

7.

That selected candidate will have to submit a certificate of his/her fitness from a

Government/Registered Medical Practitioner. In case woman candidate pregnant

beyond twelve (12) weeks will stand temporarily unfit till the confinement is over.

The woman candidate shall be re-examined for the fitness from an authorized

Medical Officer/Practitioner.

8.

That contract appointee shall be entitled to TA/DA if required to go on tour in

connection with his/her official duties at the same rate as applicable to regular counter-

part officials at the minimum of pay scale.

9.

That the Employees Group Insurance Scheme as well as EPF/GPF will not be

applicable to contractual appointee(s).

IN WITNESS the FIRST PARTY AND SECOND PARTY have herein to set their

hands the day, month and year first above written.

IN THE PRESENCE OF WITNESSES :

1. …………………………..

. ………………………….

(Name and full address ) Signature of the FIRST PARTY

2.

………………………..

…………………………..

(Name and full address )

Signature of the SECOND PARTY

8544

jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939

ENVIRONMENT, SCIENCE & TECHNOLOGY DEPARTMENT

NOTIFICATION

Dated: 07th November, 2017

No. STE-E(3)-10/2017-Pt-I.—In pursuance of the notification of Wetlands (Conservation

and Management) Rules, 2017 by Ministry of Environment, Forest & Climate Change,

Government of India, dated 26-09-2017, the Governor, Himachal Pradesh is pleased to constitute

Himachal Pradesh State Wetlands Authority(HPSWA) under the Conservation and

Management of Wetlands as defined in Rule 5 sub rule (1) of the Wetlands (Conservation and

Management) Rules, 2017 as under:

1.

The State Government hereby constitutes the State Wetlands Authority with the

following members, namely:—

(i)

Minister In-charge of the Department of Environment, Science and Technology –

Chairperson;

(ii)

Chief Secretary to the Govt. of H.P – Vice Chairperson;

(iii)

Additional Chief Secretary, Environment,Science & Technology,Govt.of H.P –

Member ex- officio;

(iv)

Secretary in-charge of the Department of Forest - Member ex-officio;

(v)

Secretary in-charge of the Department of Urban Development - Member ex-officio;

(vi)

Secretary in-charge of the Department of Rural Development - Member ex-officio;

(vii)

Secretary in-charge of the Department of Fisheries - Member ex-officio;

(viii) Secretary in-charge of the Department of Irrigation and Public Health - Member ex-

officio;

(ix)

Secretary in-charge of the Department of Tourism - Member ex-officio;

(x)

Secretary in-charge of the Department of Revenue - Member ex-officio;

(xi)

Incharge, State Remote Sensing Centre - Member ex-officio;

(xii)

Principal Chief Conservator Forests(HOFF)-Member ex-officio;

(xiii) Chief Wildlife Warden - Member ex-officio;

(xiv)

Member Secretary, State Biodiversity Board - Member ex-officio;

(xv)

Member Secretary, State Pollution Control Board - Member ex-officio;

(xvi)

Additional Principal Chief Conservator of Forests of the Regional Office of

Ministry of Environment, Forest and Climate Change - Member ex-officio;

8545

jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939

(xvii) Five non-official members to be nominated in due course in field of Ecology,

Landscape, Fisheries, Hydrology and socio- Economics

(xviii) Member Secretary/Joint Member Secretary, Himachal Pradesh Council for

Science, Technology and Environment (HIMCOSTE) – Member Secretary;

2.

The H.P.State Wetlands Authority shall exercise the powers and functions as

defined in the notification No. GSR 1203(E) of the Ministry of Environment, Forests and

Climate Change, Government of India, New Delhi.

3.

The H.P. State Council for Science Technology and Environment (HIMCOSTE), shall

provide all necessary support and act as nodal Department and Secretariat to the Authority.

4.

As per Rule 5 Sub Rule (6) of Wetland (Conservation & Management ) Rules 2017, the

Authority shall, within ninety days of these rules, shall constitute:—

(a) a technical committee to review brief documents, management plans and advise on

any technical matter referred by the Wetland Authority; and

(b) a grievance committee consisting of four members to provide a mechanism for

hearing and forwarding the grievances raised by public to the Authority;

5.

The Committees referred to in sub-rule (6) shall meet at least once in every quarter to

perform their functions.

6.

The Authority shall meet at least thrice in a year.

7.

The term of non-official members of the Authority nominated by State Government,

shall be for a period not exceeding three years.

The office of the Himachal Pradesh Council for Science, Technology & Environment

(HIMCOSTE), Vigyan Bhawan, Bemloe, Shimla-1 would function as the Secretariat of the

Himachal Pradesh State Wetlands Authority for Conservation and Management of the

Wetlands of the State.

By order,

Sd/-

Chief Secretary.

8546

jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939

fu;U=d] eqnz.k rFkk ys[ku lkexzh] fgekpy izns'k] f'keyk&5 }kjk eqfnzr rFkk izdkf'kr

bysDVªkWfud gLrk{kfjr jkti=] oSclkbV http://rajpatrahimachal.nic.in ij miyC/k gS ,oe~ vkWuykbu lR;kfir fd;k tk ldrk gS