jkti=] fgekpy izns'k
fgekpy izns'k jkT; 'kklu }kjk izdkf'kr
'kfuokj] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939
fgekpy izns'k ljdkj
TRANSPORT DEPARTMENT
NOTIFICATION
Shimla-02, the 21st November 2017
No. TPT-E(3)-57/2017.—The Governor, Himachal Pradesh in exercise of the powers
conferred by sub section 14(3) of the Himachal Pradesh Motor Vehicle Taxation Act, 1972 (Act
No:4 of 1973) and all other powers enabling him in this behalf is pleased to exempt the vehicle No.
HP- 25-A-1815 which is registered in the name of Sh. Raj Kumar S/o Lakhi Ram, VPO and Tehsil
Morang, Distt. Kinnour, Himachal Pradesh from the payment of Special Road Tax and Token Tax
180&jkti=@2017&02&12&2017
¼8359½
8360
jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939
leviable under Section-3 of the Himachal Pradesh Motor Vehicle Taxation Act, 1972 with effect
from 16-10-2007 to 21-09- 2017 as the vehicle in question is off road during this period.
By order,
SANJAY GUPTA,
Principal Secretary (Transport).
____________
TRANSPORT DEPARTMENT
NOTIFICATION
Shimla-02, the 1st December 2017
No.TPT-C(9)-4/2017-loose.—The Governor, Himachal Pradesh in exercise of the powers
conferred by sub section (6) of Section-41 of the Motor Vehicles Act, 1988 (No.59 of 1988) and all
other powers enabling him in this behalf is pleased to allot /release registration marks/number from
Serial No.0001 to 9999 under the Registration marks HP-96 to Registering & Licensing Authority
Dheera, District Kangra, Himachal Pradesh for registration of motor vehicles with immediate
effect.
By order,
SANJAY GUPTA,
Principal Secretary (Transport.)
&&&&&&&&&&
[AUTHORITATIVE ENGLISH TEXT OF THIS DEPARTMENT NOTIFICATION No. TCP-F(5)-
6/2017 SHIMLA, DATED 12-9-2017 AS REQUIRED UNDER CLAUSE (3) OF ARTICLE 348 OF
THE CONSTITUTION OF INDIA].
TOWN AND COUNTRY PLANNING DEPARTMENT
NOTIFICATION
Shimla-2, 12th September, 2017
No.TCP-F(5)-6/2017.—WHEREAS, the draft Development Plan for Nadaun Planning
Area was published by the Director, Town and Country Planning Department, Himachal Pradesh,
Shimla under sub-section (1) of section 19 of the Town and Country Planning Act, 1977 (Act No.
12 of 1977) read with rule 11 of the Himachal Pradesh Town and Country Planning Rule 2014 vide
Notice No. HIM/TP/PJT/D.P.Nadaun/2004/Vol-II/12-30 dated 01.04.2017 published in the Rajptra,
Himachal Pradesh on 20.05.2017 for inviting objection(s) and suggestions(s), which were duly
considered and the draft Development Plan was submitted to the Government for approval.
NOW THEREFORE, in exercise of the powers vested under subsection (1) of section 20 of
the Himachal Pradesh Town and Country Planning Act, 1977 (Act No.12 of 1977), the Governor,
Himachal Pradesh is pleased to approve the Development Plan for Nadaun Planning Area, without
any modifications and the same is hereby published in the Official Gazette of Himachal Pradesh as
8361
jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939
required under sub-section (4) of section 20 of the Act ibid. A Notice is hereby given that a copy of
the said Development Plan is available for inspection during office hours in the following
offices:—
1.
The Director,
Town and Country Planning Department,
Nagar Yojana Bhawan, Block No.32-A, Vikas Nagar,
Kasumpti, Shimla, Himachal Pradesh-171009.
2.
The Towm and Country Planner,
Divisional Town Planning Office,
Hamirpur, Himachal Pradesh.
3.
The Planning Officer
Town Planning Office,
Nadaun, District Hamirpur, Himachal Pradesh.
4.
The Secretary,
Nagar Panchayat, Nadaun,
District Hamirpur, Himachal Pradesh.
The said Development Plan shall come into operation from the date of publication of this
Notification in the Official Gazette in terms of subsection (5) of section 20 of the Act ibid and shall
be binding on all Development Authorities constituted under the said Act and all local authorities
functioning within the Nadaun Planning Area.
By order,
MANISHA NANDA,
Additional Chief Secretary (TCP).
________
uxj ,oa xzke ;kstuk foHkkx
vf/klwpuk
f'keyk&2] 12 uoEcj] 2017
la[;k- Vh0lh0ih0&,Q¼5½&6@2017-&&uknkSu ;kstuk {ks= ds fy, fodkl ;kstuk ds izk:Ik dks
fgekpy izns'k uxj vkSj xzke ;kstuk fu;e] 2014 ds fu;e 11 ds lkFk ifBr fgekpy izns”k uxj vkSj
xzke ;kstuk vf/kfu;e] 1977 (1977 dk vf/kfu;e la[;kad 12) dh /kkjk 19 dh mi/kkjk (1) ds v/khu]
vk{ksi ¼iksa½ vkSj lq>ko ¼oksa½ dks vkeaf=r djus ds fy, funs'kd] uxj ,oa xzke ;kstuk foHkkx] fgekpy
izns'k }kjk uksfVl la[;k fge@Vhlhih@ihtsVh@Mh-ih-uknkSu@2004@oksY;we&II@12&30 rkjh[k
01&04&2017 }kjk jkti=] fgekpy izns'k esa rkjh[k 20&05&2017 dks izdkf'kr fd;k x;k Fkk ftu ij
lE;d~ :Ik ls fopkj fd;k x;k vkSj fodkl ;kstuk ljdkj ds izk:Ik dks vuqeksnu ds fy, izLrr fd;k
x;kA
vr% fgekpy izns”k ds jkT;iky] fgekpy izns”k uxj vkSj xzke ;kstuk vf/kfu;e] 1977 (1977 dk
vf/kfu;e la[;kad 12) dh /kkjk 20 dh mi/kkjk (1) ds v/khu fufgr 'kfDr;ksa dk iz;ksx djrs gq,] uknkSu
;kstuk {ks= ds fy, fodkl ;kstuk dks fcuk fdlh mikUrj.k ds vuqeksfnr djrs gSa vkSj bls iwoksZDr
vf/kfu;e dh /kkjk 20 dh mi/kkjk ¼4½ ds v/khu ;Fkk visf{kr ds vuqlkj jkti=] fgekpy izns'k esa
,rn~}kjk izdkf'kr fd;k tkrk gSA ,rn~}kjk uksfVl fn;k tkrk gS fd mDr fodkl ;kstuk dh ,d izfr
fujh{k.k gsrq fuEufyf[kr dk;kZy;ksa esa dk;kZy; le; ds nkSjku miyC/k jgsxh] vFkkZr~%&
8362
jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939
1- funs'kd]
uxj ,oa xzke ;kstuk foHkkx]
uxj ;kstuk Hkou] Cykd u0 32&,
dLkqEiVh] f'keyk] fgekpy izns'k&171009-
2- uxj ,oa xzke ;kstukdkj]
e.Myh; uxj ;kstuk dk;kZy;]
gehjiqj] fgekpy izns'kA
3- ;kstuk vf/kdkjh]
uxj ,oa xzke ;kstuk dk;kZy;]
uknkSu] ftyk gehjiqj] fgekpy izns'k A
4- lfpo]
Ukxj iapk;r uknkSu]
ftyk gehjiqj] fgekpy izns'k A
mDr fodkl ;kstuk] iwoksZDr vf/kfu;e dh /kkjk 20 dh mi/kkjk ¼5½ ds fucU/kuksa ds vuqlkj bl
vf/klwpuk ds jkti= esa izdk'ku dh rkjh[k ls izorZu esa vk,xh vkSj mDr vf/kfu;e ds v/khu xfBr
leLr fodkl izkf/kdj.kksa rFkk uknkSu ;kstuk {ks= ds Hkhrj fØ;k'khy leLr izkf/kdj.kksa ds fy, vkc}dj
gksxhA
vkns”k }kjk]
Ekuh’kk uUnk]
vfrfjDr eq[; lfpo (Vh0lh0ih0)
&&&&&&&&
[AUTHORITATIVE ENGLISH TEXT OF THIS DEPARTMENT NOTIFICATION No. TCP-F(5)-
5/2017 SHIMLA, DATED 12-9-2017 AS REQUIRED UNDER CLAUSE (3) OF ARTICLE 348 OF
THE CONSTITUTION OF INDIA].
TOWN AND COUNTRY PLANNING DEPARTMENT
NOTIFICATION
Shimla-2, 12th September,2017
No.TCP-F(5)-5/2016.—WHEREAS, the draft Development Plan for Dharamshala
Planning Area was published by the Director, Town and Country Planning Department, Himachal
Pradesh, Shimla under sub-section (1) of section 19 of the Town and Country Planning Act, 1977
(Act No. 12 of 1977) read with rule 11 of the Himachal Pradesh Town and Country Planning Rules,
2014 vide Notice No. HIM/TP/PJT/D.P. Dharamshala/2013/Vol-III/103-20 dated 01.04.2017
published in the Rajpatra, Himachal Pradesh on 21.04.2017 for inviting objection(s) and
suggestion(s), which were duly considered and the draft Development Plan was submitted to the
Government for approval.
Now THEREFORE, in exercise of the powers vested under sub-section (1) of section 20 of
the Himachal Pradesh Town and Country Planning Act, 1977 (Act No.12 of 1977), the Governor,
Himachal Pradesh is pleased to approve the Development Plan for Dharamshala Planning Area,
8363
jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939
without modifications and the same is hereby published in the Official Gazette of Himachal
Pradesh as required under sub-section (4) of section 20 of the Act ibid. A Notice is hereby given
that a copy of the said Development Plan is available for inspection during office hours in the
following offices, namely:—
1. The Director,
Town and Country Planning Department,
Nagar Yojana Bhawan, Block No. 32-A, Vikas Nagar,
Kasumpati, Shimla, Himachal Pradesh-171009.
2. The Town and Country Planner,
Divisional Town Planning Office, Dharamshala
District Kangra, Himachal Pradesh.
3. The Commissioner,
Municipal Corporation, Dharamshala,
District Kangra, Himachal Pradesh.
The said Development Plan shall come into operation from the date of publication of this
Notification in the Official Gazette of Himachal Pradesh.
By order,
MANISHA NANDA
Addl. Chief Secretary (TCP).
__________
uxj ,oa xzke ;kstuk foHkkx
vf/klwpuk
f'keyk&2] 12 uoEcj] 2017
la[;k- Vh0lh0ih0&,Q¼5½&5@2017-&&/keZ'kkyk ;kstuk {ks= ds fy, fodkl ;kstuk ds izk:Ik dks]
fgekpy izns”k uxj vkSj xzke ;kstuk fu;e] 2014 ds fu;e 11 ds lkFk ifBr fgekpy izns'k uxj vkSj
xzke ;kstuk vf/kfu;e] 1977 (1977 dk vf/kfu;e la[;kad 12) dh /kkjk 19 dh mi/kkjk (1) ds v/khu
vk{ksi ¼iksa½ vkSj lq>ko ¼oksa½ dks vkeaf=r djus ds fy, funs'kd] uxj ,oa ;kstuk foHkkx] fgekpy izns'k
}kjk] uksfVl la[;k% fge@Vhih@ihtsVh@Mh-ih- /keZ'kkyk@2013@oksY;we&III@103-20 rkjh[k 01&04-2017
}kjk] jkti=] fgekpy izns'k esa rkjh[k 21 vizSy] 2017 dks izdkf'kr fd;k x;k Fkk ftl ij lE;d~ :Ik ls
fopkj fd;k x;k vkSj fodkl ;kstuk ds izk:Ik dks ljdkj dks vuqeksnu ds fy, izLrqr fd;k x;kA
vr% fgekpy izns”k ds jkT;iky] fgekpy izns'k uxj vkSj xzke ;kstuk vf/kfu;e] 1977 (1977 dk
vf/kfu;e la[;kad 12) dh /kkjk 20 dh mi/kkjk (1) ds v/khu fufgr 'kfDr;ksa dk iz;ksx djrs gq,]
/keZ'kkyk ;kstuk {ks= ds fy, fodkl ;kstuk dks fcuk fdlh mikUrj.k ds vuqeksfnr djrs gSa vkSj bls
iwoksZDr vf/kfu;e dh /kkjk 20 dh mi/kkjk ¼4½ ds v/khu ;Fkk visf{kr ds vuqlkj jkti=] fgekpy izns'k esa
,rn~}kjk izdkf'kr fd;k tkrk gSA ,rn~}kjk uksfVl fn;k tkrk gS fd mDr fodkl ;kstuk dh ,d izfr
fujh{k.k gsrq fuEufyf[kr dk;kZy;ksa esa dk;kZy; le; ds nkSjku miyC/k jgsxh] vFkkZr%&
8364
jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939
1- funs'kd]
uxj ,oa xzke ;kstuk foHkkx]
uxj ;kstuk Hkou] Cykd u0 32&,]
dLkqEiVh] f'keyk] fgekpy izns'k&171009-
2- uxj xzke ;kstukdkj]
e.Myh; uxj ;kstuk dk;kZy;] /keZ'kkyk]
ftyk dkaxM+k] fgekpy izns'k A
3- vk;qDr]
Ukxj fuxe] /keZ'kkyk] ftyk dkaxM+k
fgekpy izns'k A
mDr fodkl ;kstuk bl vf/klwpuk ds jkti= fgekpy izns'k esa izdk'ku dh rkjh[k ls izorZu
vk,xhA
vkns”k }kjk]
Ekuh’kk uUnk]
vfrfjDr eq[; lfpo (Vh0lh0ih0)A
_____________
DEVELOPMENT PLAN
NADAUN PLANNING AREA
DISTRICT HAMIRPUR,
HIMACHAL PRADESH
Prepared By:
Town and Country Planning Department
Government of Himachal Pradesh
Mission: Shaping Tomorrow
Consultant:
Voyants Solutions Pvt. Ltd., Gurugram
8365
jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939
ANNEXURES
Annexure 1
Twelveth Schedule of the 74th Consitutional Amendment
Annexure 2
Khasras falling in Steep Slopes
Annexure 3
Traffic Projections
Annexure 4
Broad Cost Estimates
Annexure 5
Sample Layout Plan for 30 sq.m. Row Housing Building
List of Tables
Table 2-1: Notified Planning Area of Nadaun
Table 2-2: Terrain Analysis
Table 2-3: Slope Analysis
Table 3-1: Urban settlement pattern in Hamirpur District
Table 3-2: Population Distribution of Nadaun Planning Area
Table 3-3: Distribution of Settlements by Population Size, 2011
Table 3-4: Population Distribution in Nadaun Planning Area
Table 3-5: Population Projections for Nadaun Planning Area by five different methods
Table 3-6: Proposed Growth Centre in NPA
Table 3-7: Proposed Settlement Hierarchy and Proposed Facilities in Nadaun Planning Area - 2035
Table 4-1: Occupational Structure of Nadaun
Table 4-2: Production of Horticultural Crops
Table.4-3: Proposed Occupational Classification of Nadaun
Table 5-1: Year wise population in the Planning Area
Table 5-2: Housing Forecast
Table 5-3: Year wise Housing Need
Table 5-4: Proposed Distribution of Households by Housing Category
Table 5-5: Distribution of Housing by Supply Agencies
Table 6-1: Village Roads, Nadaun Planning Area
Table 6-2: Roads Maintained by Nagar Panchayat
Table 6-3: Level of Service in terms of Traffic Volume
Table 6-4: Level of Service Criteria
Table 7-1: Projected Distribution of Hotels and Beds
Table 8-1: Future demand for Educational Institutes
Table 8-2: Future demand for Healthcare Facilities
Table 8-3 Future demand for postal services
Table 8-4 Future requirement for security facilities
Table 8-5 Future demand for other community facilities
Table 8-6 Future demand for recreational facilities
Table 8-7 Future demand for sports facilities
Table 9-1: Water Demand and Gap
Table 9-2: Water Treatment Demand
Table 9-3: Service Level Benchmarking for Water Supply System (2016-2035)
Table 9-4: Sewerage Generation and Gap
Table 9-5: Service Level Benchmarking for Sewerage and Sanitation (2016-2035)
Table 9-6: Solid Waste Generation and Gap
Table 9-7: Service Level Benchmarking for Solid Waste Management (2016-2035)
Table 9-8: Details of existing power infrastructure
Table 9-9: Technical Details of Road Lighting System
Table 9-10: Telecommunication Connections, 2035
Table 10-1 Water Quality Monitored in between Dhera Bridge and Nadaun Bridge
Table 10-2: Type of disasters in Hamirpur District
Table 10-3: Ground Water Quality, Hamirpur District
Table 11-1 Local Level Steering Group
8366
jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939
Table 13-1: Area allocation for various facilities zone-wise
Table 14-1: Land use Distribution, 2016
Table 14-2: Proposed Land Use Classification, 2035
Table 14-3: Land use Distribution, 2035
Table 15-1: Summary of Infrastructure Cost
Table 15-2: Phase-wise costing
Table 16-1: Components of Nadaun Planning Area
Table 16-2: Colouring of Plans
Table 16-3: Clearances from Electric Supply Lines
Table 16-4: Residential Building Regulations shall be applicable in Nadaun Planning Area
Table 16-5: For Industrial Uses
Table 16-6: Standards for building lines and control lines for Plain and Rolling terrain for Built-up area
Table 16-7: Risk Based Classification of Buildings for Nadaun Planning Area
List of Figures
Figure 2-1: Location of the Planning Area
Figure 2-2: Nadaun Planning Area, Hamirpur
Figure 2-3: Administrative set up in Planning Area
Figure 4-4: Regional Connectivity of Nadaun
Figure 2-5: Historical Evolution of Nadaun Town
Figure 2-6: Elevation Analysis - Nadaun Planning Area
Figure 2-7: Slope in the Planning Area
Figure 3-3: Growth Rate of Nadaun Planning Area
Figure 3-4: Age-Sex Composition
Figure 3-5: SC distribution in Planning Area
Figure 3-6: Literacy rate in Nadaun Planning Area
Figure 3-7: Population Projections for Nadaun Planning area by five different methods
Figure 3-8: Proposed Settlement Pattern
Figure 4-1: Workers Distribution
Figure 4-2: Agricultural Area in Nadaun Planning Area
Figure 4-3: Share of Activities in Tertiary Sector
Figure 4-4: Occupation Structure of Employed People
Figure 4-5: Income Structure
Figure 5-1: Settlements in the Planning Area
Figure 5-2: Condition of Houses
Figure 5-3 Age of Structure in Nadaun Planning Area
Figure 5-4: Type of Structures
Figure 5-5: Material of Roof
Figure 5-6 Material of Floor
Figure 5-7: Material of Wall
Figure 5-8: Dwelling Unit Size
Figure 5-9: Ownership Status
Figure 5-10: Housing demand as per income category
Figure 6-1 Types of Materials
Figure 6-2: Vehicle Growth, 2011 to 2015
Figure 6-3: Vehicle classes
Figure 6-5: Present Level of Service of Different Roads
Figure 6-6: Mode of Transport Usage
Figure 7-1: Places of Tourist Attractions, Nadaun
Figure 7-2: Nadaun Fort
Figure 7-3: Nadaun Fort
Figure 7-4: Historical Gurudwara, Nadaun
Figure 7-5: Samadhi of Dhyanu Bhagat
Figure 7-6: Baoli at Gagaal
Figure 7-7: Pattan Bazaar di Periyan
Figure 7-8: Shiv Temple in Nadaun
Figure 7-9: Peer Saheb Grave
Figure 7-10: Atal Bihari Vajpayee Cricket Stadium
8367
jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939
Figure 7-11: Principles of Sustainable Tourism
Figure 8-1:Himachal Institute of Pharmaceutical Research Institute, Nadaun
Figure 8-2: Vijay Vallabh Pvt ITI, Nadaun
Figure 8-3: Sub-Divisional Veterinary Hospital
Figure 8-4: Community Hall
Figure 8-5:Existing Park in Nadaun Planning Area
Figure 8-6: Ramlila Maidan
Figure 8-7: Atal Bihari Vajpayee Stadium in Bela
Figure 9-1: Intensity-Duration Curve
Figure 10-2: Earthquake Hazard Map
Figure 10-3: Tehsil wise forest fire risk area of Hamirpur district
Figure 10-4: Probabilistic seismic hazard analysis
Figure 10-5: Location of Llineament and Landslide Prone Area in Nadaun Planning Area
Figure 13-1: Development Proposals
Figure 13-2: Proposed Transportation Facilities
Figure 14-1: Existing Land use Map of Nadaun Planning Area, 2016
Figure 14-2: Proposed Land Use Plan
List of Maps
E\01
Cadastral Map
E\02
Settlement Map
E\03
Road Network Map
E\04
Forest Map
E\05
Agricultural and Horticultural Map
E\06
Educational Facility Map
E\07
Health Facility Map
E\08
Heritage Structure Map
E\09
Existing Land Use Map
A\01
Slope Analysis Map
A\02
Catchment Analysis Map
A\03
Government Land Map
A\04
Non Developable Land Map
A\05
Developable Land Map
P\01
Proposed Land Use Map
List of Abbreviations
%
percent
AGiSAC
Aryabhatta Geo Informatics and Space Application Centre
BIS
Bureau of Indian Standard
BMO
Block Medical Office
BOD
Biochemical Oxygen Demand
CAGR
Compound Annual Growth Rate
CBSE
Central Board of Secondary Education
CD Block
Community Development Block
CFL
Compact Fluorescent Lamp
CPCB
Central Pollution Control Board
cumes
Cubic meter per second
DHE
Department of Higher Education
DO
Dissolved Oxygen
DPF
Demarcated Protected Forest
DSP
Deputy Superintendent of Police
DTCA
Department of Tourism and Civil Aviation
ft.
feet
GDDP
Gross District Domestic Product
GDP
Gross Domestic Product
GEC-97
Groundwater Resource Estimation Committee - 1997
GIS
Geographic Information System
8368
jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939
GoHP
Government of Himachal Pradesh
GoI
Government of India
GP
Gram Panchayat
GSDP
Gross State Domestic Product
ha
Hectare
HFL
High Flood Level
HFW
Health and Family Welfare Department
HGV
Heavy Goods Vehicles
HH
Household
HPIPH
Himachal Pradesh Irrigation and Public Health Department
HPSEB
Himachal Pradesh State Electricity Board
HPSPCB
Himachal Pradesh State Pollution Control Board
HPTCP Act
Himachal Pradesh Town and Country Planning Act
HRTC
Himachal Road Transport Corporation
I.C.A.R
Indian Council of Agricultural Research
IRC
Indian Road Congress
IPH Dept.
Irrigation and Public Health Department
ITI
Industrial Training Institute
km
kilometer
L.U.P.
Land Use Planning
LED
Light Emitting Diode
LMV
Light Motor Vehicle
LOS
Level of Service
lpcd
litres per capita per day
LWSS
Lift Water Supply Scheme
m
metres
MLD
Million Litres per Day
mm
millimeter
msl
mean sea level
MSME
Micro Small and Medium Enterprises
MDR
Major District Road
MoEF
Ministry of Environment and Forest
MoUD
Ministry of Urban Development
MoRTH
Ministry of Road Transport and Highways
MT
Metric Tonne
MW
Mega Watt
NAC
Notified Area Council
NDDP
Net District Domestic Product
NDP
Net Domestic Product
NH
National Highway
NHAI
National Highway Authority of India
NIDM
National Institute of Disaster Management
NP
Nagar Panchayat
NRSC
National Remote Sensing Centre
NSDP
Net State Domestic Product
O-D
Origin - Destination
ODR
Other District Road
PCI
Per Capita Income
PCU
Passenger Car Unit
PM
Particulate Matter
PMGSY
Pradhan Mantri Gram Sadak Yojana
pph
persons per hectare
PPP
Public Private Partnership
PPPP
People Public Private Partnership
ppm
parts per million
PRI
Panchayati Raj Institution
psi
pounds per square inch
PWD
Public Works Department
RFP
Request for Proposal
ROW
Right of Way
RSPM
Respirable Suspended Particulate Matter
SC
Scheduled Caste
8369
jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939
SDM
Sub-Divisional Magistrate
SHO
Station House Officer
SPM
Suspended Particulate Matters
sq.km.
square kilometer
ST
Scheduled Tribe
TCPD
Town and Country Planning Department
UGC
University Grant Commission
UGR
Under Ground Reservoir
UN
United Nations
UNESCO
United Nations Educational, Scientific and Cultural Organisation
URDPFI
Urban and Regional Development, Planning, Formulation and Implementation
USP
Unique Selling Proposition
UT
Union Territory
UFW
Unaccounted For Water
V/C
Volume/Capacity
WHO
World Health Organisation
WPR
Work Participation Rate
___________
EXECUTIVE SUMMARY
1.0
Project Context
Himachal Pradesh is one of the leading hill States in India with a population of 68,64,602 persons
as per 2011 Census. There are 54 Urban Local Bodies and 59 census towns in the State. Apart from
these, there are 34 Planning Areas and 35 Special Areas notified under the provisions of the
Himachal Pradesh Town and Country Planning Act, 1977.
In the wake of rapid urbanisation and economic growth, the Government of Himachal Pradesh
(GoHP) intends to regulate the development process in its urban settlements, to ensure that these
urban settlements continue to serve their purpose without causing inconveniences and difficulties to
the population, and the administration. To achieve the same, the Department of Town and Country
Planning has prepared this Development Plan.
2.0
Planning Area Profile
Nadaun is a historical trade town in Hamirpur district which is famous for its historical Nadaun
Fort and Dasvin Patshahi Gurudwara, National level Atal Bihari Vajpayee Cricket Stadium,
Laveneshwar Mahadev Temple and Peer Sai Fazal Shah Saheb Grave. Nadaun is situated between
Kangra and Hamirpur Towns. It is situated at the foothills of Shiwalik ranges at an elevation
ranging from 260 to 400 meters above mean sea level on the left bank of the Beas River. The town
is situated in sub-tropical monsoon climatic region with wet summer and cold-wet winter seasons.
The major soil type in the region is sandy loam which is good for both cultivation and forestry.
Nadaun Planning Area comprises of four revenue villages of Nadaun Nagar Panchayat and eleven
Revenue Villages in Gram Panchayats constituting 9,912 population and comprising 897.39 Ha of
area. The gross population density of Nadaun Planning Area stands at 11 pph. The gross population
density of Nadaun Nagar Panchayat is 19 pph in 2011 which has been in a constant since 2001
attributed due to low growth rate of population in urban area. However, Nadaun Planning Area has
a net density of 74 pph.
Nadaun Planning Area is located at cross-junction of two National Highways, NH-3 connecting
Nadaun with Atari and Manali via Amritsar-Jalandhar-Hoshiarpur-Hamirpur-Mandi-Kullu and NH-
303 connecting Nadaun with Nagrota via Ranital-Jwalamukhi. The nearest airport is located at
Gagaal at a distance of 59 km while the nearest railway station is Jwalaji Road (a narrow-gauge
8370
jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939
railway station) at about 33 km away from the planning area. The nearest broad-gauge railway
station is located at Amb at a distance of 38 km from the planning area.
2.01
Demographic Characteristics
Of the total population of Nadaun Planning Area (i.e., 9,912) 44.69% population (4,430) reside in
the Nagar Panchayat Area and 55.31% (5,482) in the rest of the planning areas. The Planning Area
has a decadal population growth of 12.68% in the last decade, a sex ratio of 996 females per 1000
males and literacy rate of 91% as per Census 2011. The Planning Area has about 16% population,
under category of Scheduled Caste and Scheduled Tribe.
2.02
Economy of the Planning Area
The Work Participation Rate of the planning area is 46% with most of the workers (56.64%)
engaged in tertiary sector, 41.64% engaged in primary sector and only 1.72% works engaged in
secondary or industrial sector. The workforce constitutes of 59% male and 41% female workers as
per Census 2011. The percentage of women participation has increased from 30% in 2001 to 41%
in 2011 with 72% women engaged in the primary sector. Maize and wheat are major food crop
cultivated during Kharif and Rabi season respectively. Nadaun falls in the vegetable producing belt
of the state. The main horticultural crops in the region include oranges, lemons, amla, mangoes and
galgal.
2.03
Transportation and Connectivity
Stretch of about 6.76 km of National Highway falls in the planning area. Out of which, 2.88 km act
as the urban road in Nadaun. The NHs are two lane undivided roads with 1.5m shoulders at both
ends in the planning area. Out of the total roads maintained by Nagar Panchayat, 90% are concrete
road, 7% are bitumen and 3% earthen. The other roads passing through the planning area viz.,
Major District Road (MDR) and Other District Roads (ODR) are maintained by PWD. Most of the
village roads are constructed under Pradhan Mantri Gram Sadak Yojana. Of the total roads under
PWD, 93% roads are metalled and rest non-metalled. There is no designated on-street or off-street
parking spaces and designated pathways in the planning area.
Walk trips constitute more than 65% of the total household trips. The modal split includes 65%
walk trips, 15% public transport (bus) trips, 13% two wheelers trips, 5% cars and 2% cycles/ NMT
trips.
As per the traffic survey, the Level of Service for the part of NH-3 connecting Jalari with Hamripur
is of Category A and the Level of service for the part of NH-3 connecting Nadaun with Amb and
Una is Category B while, the Level of Service for the part of NH-303 connecting Nadaun with
Kangra district is of Category C.
A by-pass has been proposed to divert the through traffic from Nadaun town. The by-pass is
proposed from the right bank of the River Beas. It enters the Planning Area near Nadaun Fort in
Bela village, passes through Tillu Khas and merge with the MDR 36 at Jalari.
2.04
Physical and Social Infrastructure Provision
Both surface water and groundwater are utilised to meet the water demand of the people of Nadaun
Planning Area. The estimated water demand for the planning area is 2.89 MLD and the sewage
generated is 2.50 MLD. Proper waste management for 16.66 T/day of the Planning Area would be
required.
8371
jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939
In terms of educational facilities, the area is self-sufficient with all the educational facilities and can
also cater to the future population. The level of medical facilities is inadequate in the planning area.
Also, there are no fire station and disaster management cell in the area. The planning area has good
coverage of telecommunications network, and is well connected with landline as well as mobile
telephonic connection. The villages have internet access facilities though the network connectivity
is poor. The villages are served by the sub-divisional head post office and sub-post offices. Every
village has postal facilities within 2km radius.
There are two main markets in Nadaun Nagar Panchayat area. The old market is located inside the
town and the new market is located near to bus stand. There are no recreational open green spaces
within the planning area, apart from a National level cricket stadium.
2.05
Forest and Environment
Nadaun Planning Area has a forest cover of 13.48% which includes 12.38% Demarcated Protected
Forest and 1.10% Forest under government land. The major species of tree found in the planning
area are Khair, Cheel, Shesam, Neem, Kikar, Sirish and Kasmal. The commonly found animals in
the district are namely leopard, hare, wild boar, jackal, kakar, monkey and sambhar.
As per the HPSPCB, the level of concentration of toxic substances such as SO2 and NO2 is within
the acceptable limits but the level of Suspended Particulate Matters (SPM) and Respirable
Suspended Particulate Matter (RSPM) present in the air is above the acceptable national standards.
2.06
Disaster Management
Nadaun Planning Area is highly prone to earthquake and related hazards. In terms of earthquake
hazard risk profiling, almost entire Hamirpur district (91%) falls in Zone V which is a very high
damage risk zone. Drought is another major problem of the region. The sources of drinking water
as well as nalah dry-up during the months of summer, due to depleted ground water level and
insufficient rainfall. In spite of being located in high vulnerability zone in terms disaster intensity,
no such preparedness mechanisms are observed at individual and community level.
2.07
Heritage and Tourism
In terms of cultural and historical importance, Nadaun Planning Area is endowed with a number of
heritage and architecturally magnificent structures of regional as well as religious importance. The
important places of interest in and around Nadaun Planning Area includes the Nadaun Fort, Peer
Saheb Grave, Patshahi Dasvin Gurudwara, Dhyanu Bhagat Samadhi, Pattan wali Paudiyan, Kaji
Pattan Paudiyan, Matta wali Paudiyan, 105 stepped Baoli and Beas River. Most of these heritage
structure are in a dilapidated conditions and no restoration processes have been undertaken by the
local or district level authorities.
There is a proposal by the State Government for river rafting from Nadaun to Dhera Bridge. It is
proposed that the base for the river rafting be developed on the north-western edge of the planning
area in Bela village in the vicinity of the Nadaun Fort. It is also proposed the camping sites be
developed on the river bed along the edge of Beas River. A Religious-cum-Heritage Tourist Circuit
is also proposed which includes Jwalaji-Pattan Bazaar-Shiv Temple-Samadhi of Dhyanu Bhagat-
Patshahi Gurudwara-Peer Saheb Grave-Lavneshwar Mahadev Temple-105 stepped Baoli-Nadaun
Fort.
The area has enough tourism potential which has not yet been explored.
2.08
Land Use
Out of the total land in Nadaun Planning Area (897.39 Ha) only 132.60 Ha i.e., 14.78% is
developed and remaining 764.79 i.e., 85.22% in under developed. Of the total developed land,
8372
jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939
about 64.32% is residential area while 5.18% of the land is under commercial use. Transportation
which includes road and other transportation facilities constitutes an area of 21.83 Ha i.e., about
16.47% of the total developed area. The public and semi-public area and open green area in Nadaun
Planning Area account for nearly 8.55% and 5.48% of total developed area of Nadaun Planning
Area. The total Nadaun Planning Area has about 57.51% land under agriculture, 15.89% land under
forest which includes about 12.38% land under Demarcated Protected Forest and 1.10% under
forest on government land. River Beas along with this bank cover about 11.76% of the total area
under Nadaun Planning Area.
3.0
Development Proposal
Based on the inherent potentials and prospects of the Planning Area. It is envisaged to develop
Nadaun as Tourism-cum-Trade Hub with encouragement given to agriculture while acting as a
Transit Town. All the supporting facilities and amenities will be developed so that it can cater
tourists as well as student population. Tourism, transit zone and mandi can emerge as an instrument
to drive economic growth and generate revenue, becomes sustainable for Nadaun.
3.01
Projections
Population of Nadaun Planning Area is anticipated to increase to 17501 by the year 2035. As 51
percent of the total population is anticipated to be workforce, there are likely to be 8926 workers,
accordingly provision of work areas has been made in the Development Plan.
4.0
Proposals and Recommendations
4.01
Housing
In order to cater for the requirements of housing for the anticipated population of 17501 persons in
the Planning Area by the year 2035, at the rate of 4.5 persons per family norm, nearly 3889 families
shall be residing in the planning area. Considering the present housing shortage of 311 dwelling
units, about 4200 dwelling units shall be required by the horizon period 2035. In view of present
trend of low residential density, at the rate of 75 persons per hectare, 104.83 hectares of additional
area is required to cater to the additional population of 7589. As 132.60 hectares area is existing,
therefore, the total developable area by 2035 would be 237.43 hectares including 2.37.hectares of
facilities and amenities.
In Nadaun Planning Area, as the residential development is envisaged to be primarily on the private
lands on one hand and acquisition being not preferred by the land owners, the onus of development
of residential areas vest with them. The land owners are to ensure either planned sub-divisions of
land or land pooling and reconstitution of the plots and accordingly development therein, ensuring
provision of convenient shopping, basic service infrastructure including water supply, sewerage
drainage, electric supply, road and other requisite facilities and services in view of creation of plots.
The owners may construct houses only for their own purpose without exhausting this process. The
housing areas are proposed to be developed by integrating future work areas and evolving
safeguards for forest areas. The proposed housing sectors/ clusters are proposed to be developed on
the neighbourhood principles of self-sufficiency by making provision of requisite infrastructure
therein. The concerned local body/Panchayat will be responsible for ensuring the implementation
of basic services and infrastructure at local level, by raising the resources through process of
undertaking remunerative schemes in the area on land to be got surrendered in its name during the
course of Land Pooling and Reconstitution mechanism. In case of bigger land parcels of vacant
land the same are to be developed by a development agency which has to play an effective role.
4.02
Trade and Commerce
The existing commercial area comprising of old bazaar (Pattan Bazaar) and the Main Bazaar and
will continue to function as such. Commercial activity in the developing new areas shall be allowed
8373
jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939
in a planned manner only. Following proposals are being made with regard to trade and
commerce:-
1. There is a need of wholesale and warehousing market (Mandi) for both Fruits and
Vegetable and Grains for the town. The same is being proposed over an area of 1.29
hectares at Jalari at the cross junction of NH-3 and MDR 36.
2. While the main bazaar shall continue to act as the Town Centre of Nadaun town. There
shall be sector-level or cluster level shopping in various sectors of the town. Such
shopping centres shall help ease off pressure on main bazaar. The following norms are
suggested for planning the above-mentioned shopping centres: —
a)
Sector-level shopping centre-45 to 50 shops for a population of 5000 persons.
b)
Convenient shopping centre-10 to 15 shops for a population of 1000 persons.
3. In order to cater to the envisaged tourist population visiting Nadaun hotel and related
activity is proposed along NH-3.
Nadaun is a traditionally a trade and historic town. In view of increase in trading activities and
boost of tourism in the region, it is proposed to develop a commercial hub at in Tillu Pratham
village along the NH-3 and about 10 hotels shall be required to cater to the tourist population by the
year 2035. The land required for plot @ 350-400 sq.m. area per hotel which includes parking and
circulation area works out to 1.67 hectares. Beside this, an area of 1.84 hectares is required for
Retail Shopping Centre at Jalari, Kuthar and Tillu Khas villages. Thus, total requirement works out
to 8.70 hectares. As existing area under commercial use is 6.88 hectares, therefore, total additional
requirement works out to 1.82 hectares.
4.03
Mixed Use
Mixed land use zone has been proposed at strategic location along the NH-3 and NH-303. It
accounts of an area of 2.41 hectares within the planning area.
4.04
Industry
There are no industrial unit operating in the town presently. In order to cater for the requirements of
anticipated secondary work force of 893 workers, @ 115 sq.m. area per worker, an area of 10.27
hectares is required for Industry by the year 2035.
It is proposed to develop an industrial estate in Tillu Khas village along the proposed 24m wide by-
pass on about 10.27 Ha of available government land. Non-polluting and non-hazardous small-
scale or cottage industrial units are proposed in the industrial area viz., Handicraft industries, and
agro processing industries.
4.05
Transportation
An area of 21.83 hectares is under the existing transportation network. Town level, inter-sectoral,
sectoral and cluster roads are required to be developed in the Planning Area.
With increase in traffic it is envisaged that present NH-3 and NH-303 will not be able to
accommodate traffic hence, it is proposed to increase the width of the present NH-3 and NH-303
from present 10 m ROW to 15 m ROW.
As most of the traffic entering Nadaun is E to E i.e., External to External, two by-passes have been
proposed one parallel to NH-3 and NH-303 traversing from the right bank of Beas river and
entering Bela near Nadaun Fort and then entering Tillu Khas village before meeting NH-3 at Jalari
and the other connecting old NH-70 (new NH-3) and old NH-88 (new NH-3) via Bharmoti Kalan at
8374
jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939
Jalari. The NH-303 and NH-3 by-passes have been proposed with an ROW of 24 m and the other
by-pass of 15 m ROW.
Three junction improvements have been suggested one at present junction of NH-3 and NH-303
near the Bus stand, another at the junction of NH-3 and proposed By-pass in Bharmoti Kalan and at
the junction of NH-3 with the two proposed by-passes at Jalari.
A truck terminal is proposed at the cross junction of the proposed by-pass and MDR-36in Jalari
Saunkhlan. The truck terminal proposed on Government land measuring an area of about 0.62
hectares. The truck terminal has been strategically located in close vicinity of the proposed
Wholesale and Warehousing Centre (Mandi) located on the other side of the NH-3 in Jalari village
as the two activities are correlated and dependent on each other.
The present bus terminal is in the heart of the town in the main market. As per the traffic
projections it is envisaged that the present bus terminal will not be able to accommodate the future
traffic volume of vehicles/people. Hence, a new bus terminal is proposed along NH-3 in an area of
about 0.56 hectares in Nagarada village.
A part from these, new roads of 6m and 9m and widening of important roads have also been
proposed in the planning area
To cater to the town level parking requirement, parking lots and taxi stand have been proposed at
various locations amounting to an area of 1.0 ha. Local level parking requirements of each land use
zone have to be met locally.
4.06
Tourism
The development of tourism in and around Nadaun call for systematic and planned development,
check on encroachments, cleanliness of town, integration and systematic and planned marketing of
tourist destinations in surrounding areas, like Nadaun Fort and other heritage sites within the
planning area and provision of basic amenities at genuine rate.
In order to boost the tourism activity in the Planning Area it is proposed to repair and restore the
Nadaun fort, develop the adjoining area in to a tourist spot with landscaped gardens, pathways and
sitting arrangements. It is further proposed to conduct light and sound show to present the rich
history of the Nadaun Fort. It is also proposed to develop other heritage sites within the planning
area as tourist sites.
4.07
Public and Semi Public
An area of 11.33 hectares is existing under utilities, facilities and services. It is anticipated that an
area of 2.35 hectares will be required more for providing various facilities at Regional to Cluster
level in the Planning Area by the year 2035 as per the requirements.
4.08
Parks and Open Spaces Use
The town lacks in organised parks and open spaces. Local Parks are therefore, required to be
developed at cluster/sector level. At the rate of standard of 1.00 hectares per 1000 population, 17.50
hectares land is required to cater for population of the Planning Area by the year 2035. As 7.27
hectares area is existing, therefore, 18.92 hectares area is required more. It is proposed to develop
the old Nadaun Fort area into a tourist spot-cum-recreational area with landscaped gardens with
fountains, and conducting light and sound show within it. About10 hectare land has also been
earmarked for proposed Botanical and Zoological Park in Tillu Khas village.
8375
jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939
4.09
Forest Areas
Nearly about 111.06 hectares of land falls under Demarcated Protected Forest use in Nadaun
Planning Area. This has been indicated in the existing land-use map as well as the proposed land-
use map. It is proposed to maintain and preserve all these forest areas. However, due to widening of
Tillu Khas road, the area under DPF has reduced to 109.38 hectares.
4.10
Water Bodies Use
The land under Water Bodies i.e. 105.51 hectares shall remain without change in land use.
1
The Context
1.1
Background
Himachal Pradesh is one of the highly developed States of India with a population of 68,64,602
persons as per 2011 Census. There are 541 Urban Local Bodies and 56 census towns2 in the State.
Also, there are 34 Planning Areas and 35 Special Areas3 notified under the provisions of the
Himachal Pradesh Town and Country Planning Act, 1977.
In the wake of rapid urbanization and economic growth, the Government of Himachal Pradesh
intends to regulate the development process in its urban settlements, to ensure that these urban
settlements continue to serve their purpose without causing inconveniences and difficulties to the
population, and the administration. To achieve the same, the Town and Country Planning
Department, Himachal Pradesh, has prepared this Development Plan for the horizon year 2035.
1.2
The Context
Nadaun is a geographically as well as administratively an important town in Hamirpur District. It is
the headquarters of Nadaun Sub-Division, Nadaun Tehsil and Nadaun Block. Besides this, Nadaun
has become an important regional trade and educational centre, increasing trade and commercial
activities with potential for allied agro/forest based industries in the vicinity have strong bearing on
its future growth. On opening of Atal Bihari Vajpayee Cricket Stadium, a national level cricket
stadium, growth potentials of town have further enhanced.
In order to ensure planned and regulated physical development of such a strategically important
town, the Himachal Pradesh Town and Country Planning Act, 1977 was extended to Nadaun
Planning Area in the year 2014 vide Gazette notification no. F (5)-7/2013 dated 15-1-2014,
covering an area of 1269.59 hectares spreading over 25 revenue villages. Later the planning area
was reduced and 10 complete revenue villages and one partly was excluded from the planning area
vid Gazette Notification No. F (5)-7/2013 dated 14-5-2015. The revised planning area includes the
Nagar Panchayat Area and 10 complete surrounding revenue villages and one partly.
For a planned and regulated development of the Nadaun Planning Area, a comprehensive
Development Plan was inevitable. Thus, this Development Plan has been prepared after making
exhaustive exercises like collection of primary and secondary data, field surveys, household, land
use and traffic survey and after examining the quantitative and qualitative aspects of various land
uses, development activities, problems and prospects of Nadaun Planning Area. The Development
Plan also includes existing situation analysis, demand-gap assessment, projection and forecasting,
future demand estimation, proposals and recommendations, policy framework and implementation
strategy.
1 Source: Urban Development Department - Himachal Pradesh, http://ud-hp.in/ulblist.html
2 Source: Census of India – 2011, http://censusindia.gov.in/towns/HP_towns.pdf
3 Source: Department of Town and Country Planning, Himachal Pradesh
8376
jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939
In order to prepare a technically viable document, acceptable to the masses, stakeholders meeting
along with face to face interactions with various government and semi-government officials,
members of Nagar Panchayat committee, public representatives Non-Govt. Organizations (NGO's)
and general public have been organized.
The Development Plan of Nadaun Planning Area contemplates increase of population from 9,912
in 2011 to 17,642 by the year 2035.
1.3
Objective
The foremost objective of the Development Plan for Nadaun is to guide the present and future
growth towards a planned and sustainable development.
The four key goals of the Development Plan are:
i.
Achieve economic growth.
ii.
Provide safe liveable neighbourhoods.
iii.
Provide efficient and sustainable physical and social infrastructure system.
iv.
Conserve the environment both natural and manmade.
____________
Planning Area Profile
2.1
Introduction
Nadaun is a small town in Himachal Pradesh located on north-west corner of Hamirpur District. It
is the Headquarters for both Nadaun Tehsil as well as Nadaun Sub-Division. Geographically,
Nadaun is situated on the foothills of the Shiwalik range on the left bank of River Beas (Refer
Figure 0-1). Besides its beautiful setting, the town has fascinating and variable scenery throughout
the year.
2.1
Location
Nadaun is located at 31.78°N 76.35°E. It has an average elevation of 508 metres (1666 feet) from
Mean Sea Level. It is situated at a distance of 28 km from Hamirpur and 12 km from Jwalamukhi
on the cross-junction of NH-3 connecting Nadaun with Atari and Manali via Amritsar-Jalandhar-
Hoshiarpur-Hamirpur-Mandi-Kullu and NH-303 connecting Nadaun with Nagrota via Ranital-
Jwalamukhi.
The town is spread over an area of 2.31 sq.km having a population of 4,430 as per Census of India,
2011 and the Planning Area covers 8.97 sq. km. having a population of 9,912 as per Gazette
Notification No. TCP-F (5)-7/2015 dated 14.05.2015.
It is well connected by roads with the major towns of the District and the State as well as the
neighbouring States. The closest airport is Gagaal Airport situated at 59 km distance from the town
center and the nearest rail head is at Jwalamukhi Road at 33 km.
2.2
Planning Area
Nadaun Planning Area was first notified vide Gazette Notification No. TCP-F (5)-7/2013 dated
15.01.2104 wherein 25 revenue villages (mohals) including Nadaun Nagar Panchayat area was
notified. Later, ten revenue villages (mohals) were completely excluded from the Planning Area
8377
jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939
and one partly as these mohals were situated outside the influence zone of Nadaun Town. The
Planning Area was re-notified vide Gazette Notification No. TCP-F (5)-7/2015 dated 14.05.2015.
Nadaun Planning Area comprises a total of 15 mohals of which four mohals lie within the Nadaun
Nagar Panchayat Area and remaining eleven mohals within the Gram Panchayat Area. The Nagar
Panchayat Area constitutes four mohals viz., Kot, Seri, Dolee Gharan and Nagarada. (Refer Figure
0-2).
The Planning Area has an area of about 897.39 Ha or 8.97 sq.km with a population of 9,912.
2.3
Extent of Planning
The planning area is bound by River Beas on the northern and north-eastern side and by Man Khad
on the western side. Nadaun town is located at the tri-junction of two of NH i.e., NH-3 (Atari-
Manali) and NH-303 (Nadaun- Nagrota).
North: Starting from the confluence point of Beas River and Man Khad along upstream of River
Beas following the northern boundary of Mohal Kot, Seri and Bela, up to the northern-eastern
boundary meeting point of Bela.
East: Starting from the meeting point of northern-eastern boundary of Mohal Bela towards
southern side following the eastern boundary of Mohal Bela, Tillu Khas, DPF Tillu, Jalari
Saunkhlan, up to the meeting point of eastern-southern boundary of Mohal Jalari Saunkhlan.
Figure 0-1: Location of the Planning Area
Source: Composed based on TCPD Gazette Notification TCP-F (5)-7/2015 dated 14.05.17
N
N
H
-
N
H
-
9,9
8378
jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939
South: Starting from the meeting point of eastern-southern boundary of Mohal Jalari Saunkhlan
towards western side following the southern boundary of Mohal Jalari Saunkhlan, up to NH-3
(Atari-Manali) then following the Nallah boundary downstream passing between Mohal Harmandir
Rukwalan, then following the southern boundary of Mohal Harmandir Mandiala, Mohal Bharmoti
Kalan, up to the meeting point of southern-western boundary of Mohal Bharmoti Kalan.
West: Starting from the meeting point of south western boundary of Mohal Bharmoti Kalan
towards northern side following the western boundary of Mohal Bharmoti Kalan, Nagarada and
Kot, up to the confluence point of Man Khad and Beas River.
The composition of Nadaun Planning Area is presented in Table 0-1.
Table 0-1: Notified Planning Area of Nadaun
Sl. No.
Name of Revenue Village
Area
(in Ha.)
Population
1
Seri
Naga
r
Panc
haya
t
61.48
4430
2
Kot
74.00
3
Nagarada
72.84
Figure 0-2: Nadaun Planning Area, Hamirpur
Source: Composed based on TCPD Gazette Notification TCP-F (5)-7/2015 dated
14.05.2015
NH-
303
NH-3
NH-
3
8379
jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939
4
Dolee Gharan
23.15
5
Tillu Pratham
13.32
335
6
Bela
193.94
2347
7
DPF Tillu
87.10
46
8
Gagaal
31.92
251
9
Kuthar
45.83
356
10
DPF Kuthar
31.14
-
11
Bharmoti Kalan
98.65
526
12
Tillu Khas
72.96
649
13
Harmandir Mandiala
57.60
458
14
Harmandir Rukwalan (Partly)
5.06
20
15
Jalari Saunkhlan
28.40
494
Total
897.39
9912
Source: TCDP Gazette Notification TCP-F (5)-7/2015 dated 14.05.2015
2.4
Administrative Set-up
Nadaun is the Tehsil as well as Block Headquarters of Nadaun Tehsil and Nadaun Block of
Hamirpur District respectively. It is also the sub-divisional head quarter of Hamirpur District.
Nadaun Planning Area consists of both the urban and rural areas. The urban area i.e., Nadaun town
is under the jurisdiction of the Nagar Panchayat and the rural areas i.e., the villages are under the
Gram Panchayats.
With rapid urbanization, the settlement of Nadaun grew into a town. Notified Area Committee or
Nagar Panchayat has been constituted which is managing the civic functions of town. The Nagar
Panchayat was constituted on 1st August, 1974. The Nagar Panchayat area is divided into 7 wards,
represented by 7 elected councillors. The institutional, residential and commercial areas have
however been developed outside the Nagar Panchayat area in the Gram Panchayats.
Nagar Panchayat of Nadaun presently, performs only four functions out of eighteen functions listed
in Twelfth Schedule of the 74th Constitutional amendment. Refer Annexure 1 for the Twelfth
Schedule of the 74th Constitutional amendment.
The functions performed by Nadaun Nagar Panchayat are revenue generation though collection of
property tax, shop rents, planning and construction and maintenance of metalled roads, street lights,
drainage system, parks and recreational centres and regulating and monitoring on construction of
building activities in Nagar Panchayat boundary.
There are three Gram Panchayats in Nadaun Planning area viz., Bela, Jalari and Bharmoti Gram
Panchayat.
Figure 0-3: Administrative set up in Planning Area
Source: Block Development Office, Nadaun
Under Secretary,
Nagar Panchayat
8380
jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939
2.5
Regional Setting and Linkages
The planning area is well connected by air, rail and roadways with all the major towns and cities of
Himachal Pradesh and India. The district head-quarter Hamirpur is just 28km away from Nadaun.
Shimla, the state capital is located at a distance of 170km from Nadaun Planning area. The two
important cities of regional importance and opportunities namely, Chandigarh and Delhi are located
at distances of 177 km and 406 km respectively.
Considering the strategic location of Nadaun town, it has the potential to be developed as a Transit
node in between Kangra and Hamirpur on one side and Kangra and Una on the other side.
2.5.1 By Air
Gaggal Airport in Kangra District is the nearest airport to Nadaun. It is located 59 km north of
Nadaun. Daily three flights ply between Delhi and Gaggal.
2.5.2 By Rail
The nearest railhead of Nadaun town is Jwalamukhi Road which is located 33 km north of the
town. It is a Narrow-Gauge Railway line which connects Pathankot with Kangra and
Jogindernagar. There is another Broad-Gauge railhead located at Amb, at a distance of 38 km south
west of Nadaun town. It is directly connected with Chandigarh and Delhi via Una.
Figure 4-4: Regional Connectivity of Nadaun
Source: Google Maps
8381
jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939
2.5.3 By Road
Nadaun is located along the NH-3 and NH-303. The town is accessible from Hamirpur (28 km
south east of the town) and Una (72 km south west of the town) by NH-3 which connects Atari-
Amritsar-Jalandhar-Hoshiarpur-Nadaun-Hamirpur-Toni Devi-Awa Devi-Mandi- Kullu- Manali4.
Sujanpur is accessible via MDR 36. The Hamirpur road (NH-3) connects Nadaun with Shimla (the
state capital) and Amb road (NH-3) connects Nadaun town Chandigarh and Delhi (National
Capital).
2.6
Historical Setting
2.6.1 Pre-Independence
During the Medieval times, Nadaun was a part of the Princely State of Kangra. It was the
headquarters of the Nadaun Jagir in the Princely State of Kangra. Maharaja Sansar Chand II5 of
Kangra held his court during summer for a number of year during his reign6.
Raja Jodhbir Chand, son of Raja Sansar Chand II, was the first king of Nadaun. He was granted the
jagir of Nadaun in 1823.7 Nadaun soon emerged as a centre of arts and commerce.
Nadaun was a cheerful place, during the reign of Sansar Chand II. There was a saying in Kangra
hill that "Aaye Nadaun Jaaye Kaun" (who comes to Nadaun would never want to go back).8 Bulleh
Shah, a famous sufi poet, in his famous poem "Bulla Ki Janna mein Kaun", also mentions Nadaun
as "Na mein rehnda vich Nadaun" (nor do I live in Nadaun).4 Ghulam Mohiuddin also, writes in
Tarikh-i-Punjab that it is peaceful town with a good Rest House, an Old Palace and Shiva temple.5
However, the history of Nadaun dates back to the seventeen century, when the famous Battle of
Nadaun was fought. The Battle of Nadaun was fought on the banks of Beas River, between Raja
Bhim Chand of Kahlur (Bilaspur) and the Mughals under Alif Khan in the year 1691. The Mughal
emperor, Aurangzeb's expeditions in Deccan in the 1690s, had put considerable strain on the
Mughal exchequer. As a result, Aurangzeb issued orders to the Governor of Punjab, Azim Khan, to
recover annual tributes from the rulers of hill states, who had been defaulting on the payment for
three consecutive years.
Azim Khan assigned the duty of collecting tributes to Mian Khan, the viceroy of Jammu. The duty
of collecting tributes from Kangra and adjoining principalities was assigned to Alif Khan.9 The
Raja of Kangra and Raja Dayal of Bijarwal agreed to the demands of Alif Khan. However, Raja
Bhim Chand of Kahlur (Bilaspur) refused to oblige and formed an alliance with other chieftains
opposed to the Mughals.
As per the tenth Granth of Guru Granth Sahib (holy book of Sikhs), Guru Gobind Singh (the tenth
Sikh Guru) fought his second battle in Nadaun on 4th April 1691 and is described as ‘Nadaun
Jang’. The first battle was fought between Guru Gobind Singh and King of Bilaspur near Bhagani
Paonta Saheb. The second battle was fought by Guru Gobind Singh with Mughals on the invitation
of Raja Bhim Chand of Kahlur (Bilaspur). Guru Gobind Singh came to fight the battle along with a
group of 500 Sikhs with Mughals lead by Alif Khan.10
4Source: MoRTH Gazette Notification S.O. 689(E) dated 04.04.2011
5 http://www.royalfamilyofindia.com/kangra/
6 History of the Punjab Hill States, J. Hutchinson and J. Ph. Vogel, 1933
7 http://www.indianrajputs.com/view/nadaun
8 http://himachal.gov.in/index1.php?lang=1&dpt_id= 201&level=1&lid=8904&sublinkid=8607
9 History of the Punjab Hill States, J. Hutchinson and J. Ph. Vogel, 1933
10 http://himachal.gov.in
8382
jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939
Mughals and his aides were defeated at a battle in Nadaun. After the battle ended, Guru Gobind
Singh stayed in Nadaun for eight days, before returning to Anandpur. Later, Maharaja Ranjit Singh
built a Gurudwara on the spot where the Guru had pitched his tent.7 The Gurudwara was built to
commemorate Guru Gobind Singh's victory in the Battle of Nadaun. The Gurudwara known as
Gurudwara Dasvin Patshahi or Gurudwara Nadaun Sahib,11 is a prominent place of worship.
2.6.2 Post-Independence
Post-Independence, Nadaun was a part of Kangra District. As a result of trifurcation of Kangra
District as Kangra, Hamirpur and Una on September 1, 1972, Nadaun became a part of Hamirpur
District of the new State of Himachal Pradesh.
2.7
Evolution of Town
Nadaun town started to evolve in the vicinity of the Patshahi Gurudwara on the North West. When
Nadaun came under the jagir of Raja Jodhbir Chand, his palace was built on the north east near the
bank of the River Beas. A small settlement in Amtar began to evolve in close vicinity of the king’s
palace. However, the main city continued to grow on the north-western side primarily due to its
nearness with Kangra, the then State Capital and its location on the trade route.
Over the years, the Nadaun town is divided into the Old Town and the New Market Area. The Old
Town comprises of Old-Market Area (also called Pattan Bazaar) and Old-Bus Stand Area (also
called Jesri). The New Market Area comprises the New Bus-Stand and the Main-Market Area.
The old-market area used to be main center of shopping when the market shifted to what is
currently the main-market area. The main-market area is further divided into two parts- the upper
bazaar which is close to the Bus-stand and the main-bazaar. Main-Bazaar is in the heart of Nadaun
town and is the center of business in Nadaun. Pattan area has got a big play-ground which hosts
various cultural events like Ramlila and sometimes used for political and election rallies.
Nadaun is known for Lavneshwar Mahadev temple which is said to be have been founded by the
Pandavas. It is the birth place of famous freedom fighter Inderpal. A statue of the famous freedom
fighter has also been erected at the junction of the New Bus Stand and the junction is named after
him. The Patshahi Gurudwara was affiliated to Shiromani Gurudwara Prabandhak Committee in
1935.
The town is also famous for the Atal Bihari Vajpayee Cricket Stadium where National level cricket
matches are organised. It is located at the North-eastern edge of Nadaun Planning Area in Bela
Gram Panchayat.
2.8
Geographical Setting
2.8.1 Physiography
Even though Nadaun is located in the foot hills i.e., Shiwalik Range of Himalayas, it is mostly plain
and has a flat terrain. The planning area has two protected forest located on the two ridges in the
centre of the planning area on either side of the NH-3. Beas River flows towards the north side of
the planning area and Man Khad flows on the western side of the planning area. The natural
drainage consists of inlets and rivulets which has not been developed inside the planning area.12
11 Sikhwiki.com and Documents from Gurudwara
12 Ground Water Information Booklet, Hamirpur District, Himachal Pradesh, District Disaster Management Report, Hamirpur
8383
jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939
2.8.1.1 Elevation
The surface elevation of Nadaun Planning Area ranges from 260 m along the Beas river valley and
Man Khad to 400 m at the peak of DPF Tillu. The elevation of the planning area rises from the
Man Khad on the western side to the hill top on the south-eastern edge of the planning area. Refer
Figure 0-6.
The terrain of the Planning area is mostly plain (57%), rolling or undulating (29%) and hilly (14%).
Table 0-2: Terrain Analysis
Type of Terrain
Area
(in Ha)
Percentage
Plain°
515.70
57.47
Rolling or Undulating°
260.57
29.04
Hilly
121.12
33.57
TOTAL
897.39
100.00
Source: Estimation from the base map
2.8.1.2 Slope
The slope of the Planning Area is from south eastern side to north western, western and southern
side. As per the slope analysis, almost 87% of the total area in the Planning Area has a gentle slope
i.e. <15°. It is suitable for any development works. Almost 11% area falls under semi-steep slope
category that ranges from 15° to 30°. Approx. 2% area falls under steep slope category that ranges
from 30°-45°. A very small area of 2.26 Ha (0.25%) fall under highly steep slope i.e. >45° where
development of any sort is not possible.13 Refer Figure 0-7 and Table 0-3.
13 URDPFI Guidelines and http://www.sappi.com/regions /sa/SappiSouthernAfrica/Sappi%20Forests/ Tree%20Faming%20
Guidelines/Part%203_Forest%20Engineering_Chapter%207_Terrain%20Classification.pdf
Figure 0-5: Historical Evolution of Nadaun Town
Source: Analysis based on History of the Punjab Hill States, J. Hutchinson and J. Ph.
Vogel, 1933 and Field investigation
NH-3
NH-
3
NH
-
303
8384
jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939
Areas with more than 15° slope are covered with the forest. These areas are mainly eco-sensitive
zones which should be demarcated as the protected or no-development zone. Refer Annexure 2 for
Khasra falling in Steep Slopes.
Table 0-3: Slope Analysis
Range of Slope
Area (in Ha)
Percentage
Less than 15°
784.06
87.37
15° - 30°
93.87
10.46
30° - 45°
17.20
1.92
Above 45°
2.26
0.25
TOTAL
897.39
100.00
Source: Analysis based on Base Map prepared by AGiSAC
2.9
Climate
The planning area falls in the humid sub-tropical zone and experiences four broad seasons. The
winter season from December to February, summers from March to June, hot and rainy season
from July to September and autumn season in the months of October and November. The region
receives the 1340.72 mm of rains during the monsoon period. The maximum rainfall i.e. almost
82% occurs during July to August and minimum in the months of April and October. In all, there
are 124 rainy days in a year in Nadaun. The hottest month is May and coldest month is January.
Maximum and minimum temperatures recorded in the area ranges from 2˚ to 40 ˚C.
2.10
Flora and Fauna
The main species of trees available in the area are Khair, Cheel, Sheesam, Neem, Kikar, Sirish
Kasmal, Kachnar, Amaltash, Bhera, Kango, Aakhe, Anjeer, Ber, Mango, Jamun, Amla etc.
The species of animals commonly found in the district are namely leopard, hare, wild boar, jackal,
kakar, monkey and sambhar. Among the birds commonly found are namely chkor, crow, jungle
murga, kala titar, safed titar and woodpecker etc.14
Figure 0-6: Elevation Analysis - Nadaun Planning Area
Source: Analysis based on Base Map prepared by AGiSAC
14 Forest Range Office, Nadaun and District Disaster Management Report, Hamirpur
NH - 3
N
H -
30
3
8385
jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939
2.11
Geology and Soil Character
Nadaun belongs to the Middle Shiwalik Sub group. The Middle Shiwalik Sub-group comprises of
large thickness of coarse micaceous sandstone along with some interbeds of early clay. It normally
succeeds the Lower Siwalik along a gradational contact. The sandstone is less sorted than those in
Lower Siwalik. Clay bands are dull coloured and silty. The general thickness is 1400 to 2000
metres.
In the low-lying areas, along river beds newer alluvium of recent again is seen. The new alluvium
deposit comprises alluvium fans and terraces of unsorted sand, silt and clay and rock fragment and
boulder beds.15
The soil in general is brown and varies in texture from loamy sand to clay loam. This type of sandy
loam soil with coarse texture which enhances the nutrients and fluid movements that is very good
for plant growth and agriculture.16
At present, few items viz. building stone, sand, stone grit, etc. are being mined in the name of
mineral resources. In addition to it glass and silica sand pebbles are also found in the area of
Kunah, and Man khads but as yet no commercial exploitation of these minerals have been made.17
Figure 0-7: Slope in the Planning Area
Source: Analysis based on Base Map prepared by AGiSAC
15 Study on the Drainage System, mineral potential and feasibility of mining in river/ stream beds of District Hamirpur, Mining
Dept., Geological Wing, Hamirpur
16 District Disaster Management Report, Hamirpur
17 Source: Geological Study Report, Hamirpur District
NH - 3
N
H -
3
NH
-
303
8386
jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939
3
Demography
3.1
Introduction
There are four urban settlements in Hamirpur district viz., Hamirpur (MC), Sujanpur (MC), Nadaun
(NP) and Bhota (NP). As per Census 2011, Nadaun (NP) is a Class V town.
Table 0-1: Urban settlement pattern in Hamirpur District
Census Classification
Population Range
Name of Urban Settlement
Class I
100,000+
-
Class II
50000 - 99000
-
Class III
20000 - 49000
-
Class IV
10000 - 19999
Hamirpur (MC)
Class V
5000 – 9999
Nadaun (NP), Sujanpur (MC)
Class VI
Below 5000
Bhota (NP)
Source: Census of India, 2011
3.2
Population
Nadaun is a sparely populated town with a population of 4430 people in 2011 and 9,912 in the
notified Planning Area.
The planning area accounts for about 2.20% of the total population of Hamirpur district. The
population distribution of Nadaun Planning area is as follows:
Table 0-2: Population Distribution of Nadaun Planning Area
Area
Population
1991
2001
2011
Hamirpur District
3,69,128
4,12,700
4,54,768
Nadaun Planning Area
7,075
8,885
9,912
Nadaun Town
3,379
4,405
4,430
Rest of Planning Area
3,696
4480
5482
Source: Census of India, 1991, 2001 and 2011
According to the Census of India, 2011, Nadaun Planning Area comprises 44.69% population
(4430 people) residing in Nadaun town and 55.31% population (5482 people) reside in rest of the
planning area.
There are 9,912 people residing in Nadaun Planning Area out of which 4970 are male (50.14%) and
4942 are female (49.86%).
3.2.2 Population Growth
Nadaun Planning Area has a decadal growth rate of 12.68% which is more than the district average
of 10.20% from 2001 to 2011. The growth rate of Nadaun Planning Area is more than the district
averages of both the decades (1991-01 and 2001-11). The growth rate has drastically come down
from 25.58 in 1991-2001 to 12.68 in 2001-2011. This is the exclusive effect of natural population
growth in the planning area.
Figure 0-1: Growth Rate of Nadaun Planning Area
Source: Census of India, 1991, 2001 and 2011
8387
jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939
3.2.2 Population Distribution
Apart from Nadaun town, the Planning Area comprises of 11 surrounding revenue villages. Out of
these 11 villages, 7 villages have population less than 500 and one village Demarcated Protected
Forest (DPF) Kuthar with no population. Two villages viz., Bharmoti Kalan and Tillu Khas have
population between 500 and 1000 Out of the rural settlement Bela has the highest population of
2347 because of its close proximity to the Nadaun town. Refer Table 0-3.
Out of the eleven mohals outside Nagar Panchayat Area, Bela has the highest population of 2347
followed by Tillu Khas (649) and Bharmoti Kalan (526). The least populated villages are
Harmandir Rukwalan (population 100), Gagaal (population 251) and Tillu Pratham (population
335). Refer Table 0-4 for village wise population distribution in the planning area.
Table 0-3: Distribution of Settlements by Population Size, 2011
Population Range No. of Villages
Name of Village or Town
<100
3
DPF Kuthar, DPF Tillu,
Harmandir Rukwalan (partly)
100-500
5
Gagaal, Tillu Pratham, Kuthar,
Jalari Saunkhlan
500-1000
2
Bharmoti Kalan, Tillu Khas
1000-2000
0
-
2000-4000
1
Bela
>4000
1
Nadaun NP
Total
12
Source: Census of India, 2011
Table 0-4: Population Distribution in Nadaun Planning Area
Nagar Panchayat/ Village Name
Population
CAGR
(01-11)
1991
2001
2011
Nadaun NP
3379
4405
4430
0.06
Bela
1481
1856
2347
2.37
Kuthar
243
289
356
2.11
Harmandir Mandiala
322
385
458
1.75
Tillu Khas
481
461
649
3.48
Tillu Pratham
-
159
335
7.74
D.P.F. Tillu
-
4
46
27.66
D.P.F. Kuthar
-
-
-
-
Bharmoti Kalan
403
470
526
1.13
Jalari Saunkhlan
421
486
494
0.16
Harmandir Rukwalan (part)
129
141
20
-3.38
Gagaal
216
229
251
0.92
Total
7075
8885
9912
1.74
Source: Census of India, 1991, 2011 and 2011
3.2.3 Sex Ratio
As per the Census of India 2011, there are 996 females per 1000 males in Nadaun Planning Area
which is lesser than the district average i.e. 1095 females per 1000 males but more than the state
average i.e. 972 in 2011. The sex ratio of the planning area has also decreased from 1018 in 2001 to
996 in 2011 in planning area.
8388
jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939
3.2.4 Age-Sex Composition
A study of the Age Sex Composition of Nadaun Town reveals that the age group 05-25 i.e., the
Younger age group is highest in the town. The age-sex pyramid of Nadaun Town shows that
Nadaun is a developing town with broader base (more youth population) and tapping pinnacle (less
elderly population).
Figure 0-2: Age-Sex Composition
Source: Census of India
3.2.5 Scheduled Caste and Scheduled Tribe Population
Out of the total population of Nadaun Planning Area, 15% of the people fall in Scheduled Caste
(SC) category which is less than the district average i.e. 24% as per Census 2011. There has been a
very minimal decrease of Scheduled Caste population from 16% in 2001 to 15% in 2011, in a span
of ten years.
Out of the total SC population in the planning area, more than 1/3rd proportion i.e. 34% reside in
the Nadaun town whereas rest 66% is distributed in the remaining areas of the Planning area.
In case of Scheduled Tribe (ST) population, there are only 59 people are from ST category which
accounts to 0.59% of the total population of Planning Area as per Census 2011. Out of total 59 ST
people, 54 reside in the Nadaun town and rest 5 reside in Tillu Pratham.
Figure 0-3: SC distribution in Planning Area
Source: Census of India, 2011
8389
jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939
3.2.6 Literacy Rate
The overall literacy rate of the Planning Area is 91% which is higher than the district average i.e.
88% in 2011. There is a sharp increase in literacy rate in planning area from 87% in 2001 to 91% in
2011.
Figure 0-4: Literacy rate in Nadaun Planning Area
Source: Census of India, 2001 and 2011
3.2.7 Population Density
Nadaun Nagar Panchayat Area has a population density of 19 persons per hectare which is more
than the district urban average i.e. 10 persons per hectare in 2011. The population density is
stagnant since the last decade from 18.8 pph in 2001 to 19 pph in 2011.
The population density of the Planning Area is 11 pph in 2011 which is more than the district
average i.e. 4 pph. The population density has marginally increased from 10 pph in 2001 to 11 pph
in 2011. According to the URDPFI Guidelines, the planning area falls under very low-density area.
3.3 Population Forecast
The population of Nadaun Planning Area is expected to be in the range of 13,000 to 18,000 by the
year 2035.
3.3.1 Population Projection
Five population projection methods have been employed to forecast the probable increase of
population in the Nadaun Planning Area for the next twenty years i.e. up to 2035. The five
projection methods are as follows: -
Arithmetic Increase
Incremental Increase
Compound Annual Growth Rate
Geometric Increase
Exponential Increase
The forecasted population from the five methods lies is shown in the Table 0-5 below.
8390
jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939
As the population projected by the arithmetic increase and incremental increase are very low and
that by geometric and exponential growth method are moderate. The projected population by
CAGR method being more appropriate to be adopted.
Hence, the projected population for Nadaun Planning Area for the year of 2035 is estimated to be
17,501 approximately at a growth rate of 2.3%.
Table 0-5: Population Projections for Nadaun Planning Area by five different methods
( )
Population
Forecasting Method
(i)
201
6
(ii)
202
1
(iii)
202
6
(iv)
203
1
(v)
203
5
(vi)
Arithmetic Increase
(vii)
107
21
(viii)
114
51
(ix)
121
80
(x)
129
09
(xi)
136
38
(xii)
Incremental Increase
(xiii)
104
58
(xiv)
107
48
(xv)
108
62
(xvi)
108
00
(xvii) 105
63
(xviii) Compound
Average Growth
Rate
(xix)
111
06
(xx)
124
43
(xxi)
139
41
(xxii) 156
20
(xxiii) 175
01
(xxiv) Geometric Increase
(xxv) 109
01
(xxvi) 118
93
(xxvii) 129
74
(xxviii) 141
55
(xxix) 154
42
(xxx) Exponential Increase
(xxxi) 109
88
(xxxii) 120
83
(xxxiii) 132
87
(xxxiv) 146
11
(xxxv) 160
67
Source: Projected based on the Last Three Decades Population
Figure 0-5: Population Projections for Nadaun Planning area by five different methods
Source: Projected based on the Last Three Decades Population
3.4 Settlement Pattern
3.4.1 Proposed Settlement Hierarchy and Facilities for 2035
Settlement planning at the sub-regional level shall be linked with on-going development process in
the region and shall focus on integration with socio-economic development.
Hamirpur is a regional trade and educational centre, increasing trade and commercial activities with
potential for allied agro/forest based industries in the vicinity have strong bearing on its future
growth. Hence, Nadaun will also come under its influence, which will trigger the economic activity
and trade between the cities and region.
Balanced settlement development strategy is essential for envisaged economic growth of the region
and the planning area.
2035
8391
jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939
Above objective can be achieved, if the following points are kept in view:
A balance, well-knit pattern of settlements system
Evenly distribution of infrastructure facilities
A road network system connecting higher order settlements with lower order
Evenly distributed, economic centre for balance economic development sub-region
Transport network
As the only growth centre in the planning area is Nadaun town, hence it will be going to become
the only urban centre for the whole planning region. With Nadaun as a centre, Bela and Tillu
Pratham with projected population of 3814 and 470 respectively, will become a part of the urban
agglomeration as they are in the vicinity of the Nadaun town. Some more growth centres like Tillu
Khas (1650), Jalari Saunkhlan (1257), Kuthar (903) having high infrastructure facilities which will
also grow with time.
The Proposed Settlement Pattern on the basis of population is as follows:
a)
Urban Centre
The first order hierarchy settlement is Urban Centre with a population range of 10,000-
20,000. It shall act as small town having linkages with immediate rural hinterlands. This
urban centre would cater to the rural hinterland as agro-service centre in the collection and
distribution of agricultural goods and services.
It would work as a nodal centre of resource based activity centre, trade and commerce,
administration, etc. The centre would have adequate infrastructure facilities with adequate
resources in quantity and quality.
Hence, Nadaun Town with two adjacent villages of Bela and Tillu Pratham would form the first
order of settlement.
b)
Growth Centres
The Growth Centre seeks to bridge the rural urban divide. The estimated population for the
Growth Centre is 5,000-10,000. The Growth Centres are the higher order village having
central location and potential for development within its catchment area, with relatively
better services and facilities in terms of education, health, communication, accessibility.
Table 0-6: Proposed Growth Centre in NPA
S. No.
Proposed Growth Centre
1
Kuthar
2
Tillu Khas
3
Jalari Saunkhlan
c)
Basic Village
All other villages have been identified as basic villages and will be provided with basic
facilities like link roads, water supply, electricity and some basic social infrastructure.
8392
jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939
(xxxvi)
Figure 0-6: Proposed Settlement Pattern
Table 0-7: Proposed Settlement Hierarchy and Proposed Facilities in Nadaun Planning Area -
2035
Level
Settlement Level
Catchment
range
(in Km)
Total
population
served
Education facility
Health
Recreation
Shopping
Road
connectivity
1
Urban Centre
- Nadaun NP
- Bela
- Tillu Pratham
10 to 15
10,000-
20,000
Vocational training/ Polytechnic
Maternity and Family Welfare Centre
Recreational
spaces/
Play grounds
Shopping
centre/
Community
welfare
centre
Road
connectivity to
other villages
and Growth
centres
2
Growth Centre
- Tillu Khas
- Kuthar
- Jalari
5 to 10
5,000-10,000
Primary school/ Secondary school
Dispensary/ health sub centre/
family welfare centre
Mela ground/
cremation
ground
Informal
Bazaar
Road
connectivity
from the Town
to the Basic
villages
3
Basic Village
- Kalan
- Mandala
- Rukwalan
- DPG Tillu
- Gagaal
Within the
village
< 5,000
Pre- Primary and Primary school
Dispensary/
health sub centre
Basic
community
space
Daily need
shop
All weather
pucca road
Source: Proposed based on URDPFI Guidelines, 2017
4
Economic Base and Employment
4.1
Economic Base
Nadaun has an agricultural based economy with more emphasis on trade and commerce due to its
locational and geographical advantage in the region.
NH - 3
NH -
3
NH -
303
8393
jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939
4.2
Employment
4.2.1 Work Participation Rate (WPR)
The total number of workers in the Planning Area is 4544 (2011 Census). The Work Participation
Rate (WPR) is 46% which is lower than the district average i.e. 53% in 2011. The WPR has
significantly increased from 32% in 2001 to 46% in 2011 which is more than the district average
increase.
4.2.2 Main and Marginal Workers
The total workers are distributed into main and marginal works. Increase in marginal workers in an
area indicates a poor trend of economic growth. In case of Nadaun Planning Area, Nadaun town
has 59% (1142) of main workers and 41% (779) marginal workers as per Census 2011 whereas the
rest of the planning area have 72% (1896) of main workers and 28% (727) of marginal workers.
Nadaun has a large informal sector as well which is why the town area has more of marginal
workers. Marginal workers have increased from 30% in 2001 to 33% in 2011.
4.3 Occupational Structure
Out of the total worker in the planning area, maximum workers (56.64%) are engaged in tertiary
activities as the town is located at the cross junction of two main highways and has prosperity in
trading. After tertiary, primary sector is the next priority sector with 41.64% workers engaged in
farming and forestry activities due to its predominant rural character. Negligible numbers of people
(1.72%) are engaged in secondary sector, comprising of household and micro scale units.
Figure 0-1: Workers Distribution
Source: Census of India, 2011
Table 0-1: Occupational Structure of Nadaun
Sector
Occupation
Percentage of Workers
Primary Sector
Agriculture, Forestry and Fishing
42
42
Secondary Sector
Manufacturing and Repairs
2
2
Tertiary Sector
Construction Activity
30
56
Trade and Hotels
10
Banking Facilities
6
Public Administration
6
Transportation and Communication
4
Source: Census of India, 2011, Economic Survey, 2005-06
4.4 Sector wise Analysis
The sector wise analysis is very important to understand the potential economic sector in the
planning area and proposals to be formulated for strengthening the same.
8394
jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939
4.4.1 Primary Sector
As it has already been discussed that the second most important economic sector is the primary
sector in terms of occupation structure (42%).
Primary sector is also, the second important sector in terms of the GDDP share during the last
decade as well. Out of the total GDDP share, primary sector shared 19% during 2000-01. The share
of primary sector in GDDP, has decreased over the period of time. During 2005-06 the share of
primary sector fell to 14% and during 2009-10 to 11%. This is clear from the above data that
people are shifting from primary sector to other sectors for the employment purposes. In spite of
the above-mentioned fact, it is very important to study the primary sector as the rest of sectors are
directly or indirectly dependent on it.
4.4.1.1 Agriculture
Agriculture is one of the main occupations of people in Nadaun Planning Area. Out of the total
primary workers 85% are engaged in agricultural activities. The sub-humid sub-tropical climate
along with sandy loam soil favour cultivation of any crops in the region. The main cultivated crops
are maize (75%) and paddy (25%) during Kharif season and wheat during Rabi season. Farmers,
having irrigated land, have also switched to cash crop farming like fruits and vegetables.
The total cultivable land available in the planning area is 341 ha which accounts almost 38% of the
total land of Nadaun Planning Area. The amount of cultivable land in the planning area is less than
the block average (Nadaun Block) i.e. 59%. Out of 341 ha, 334 ha (98%) is under agricultural use
and 6.89 ha. (2%) is under horticultural use.
The total irrigated area to total cultivated area is 34% which is more than the district average. The
main irrigation sources are khads and the Beas River.
From the Figure 0-2, it is evident that the agricultural lands are distributed uniformly in the entire
planning area. The patches are mainly seen near Man khad and the river. The soil at those places
are lose and porous which is suitable for cultivation.
In terms of production and trade, maize is the main crop which is produced largely in the area and
in the district as well.
The maize production has been increased from 13-15 quintals per hectare in 2011 to 18-20 quintals
per hectare in 2015. The growth in maize production is almost same as the district average growth.
Simultaneously, the production of wheat has also been increased from 15-16 quintals per hectare in
2011 to 20-23 quintals per hectare in 2015.
Very little amount of vegetable is also produced in the area but that is for local level use only which
is why the record is not available. There is no surplus remains which can be traded further.
A small local level mandi functions from Nadaun town where the trading items are maize and
wheat. The market rate of maize is 800-1000 rupees/ quintals whereas for wheat it is about 1500
rupees/ quintals.18
4.4.1.2 Horticulture
The main horticultural crop in the region is citrus fruits like oranges, lemons, amla etc. Other than
the citrus fruits, mangoes and galgal are also produced in the region. Out of the total cultivable area
18 Agriculture Department, Block Development Office, Nadaun Block, Hamirpur
8395
jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939
in Nadaun Planning Area, only 2% area is under the horticultural use. Area under horticultural use
in Nadaun block is 1040 ha out of which 6.89 ha (0.67%) is inside the Planning Area. The
horticultural production in the block is presented in Table 0-2.
Table 0-2: Production of Horticultural Crops
(xxxvii) Year
(xxxviii)
Production (MT)
(xxxix) 2011-12
(xl)
65
(xli)
2012-13
(xlii)
70
(xliii) 2013-14
(xliv) 80
(xlv)
2014-15
(xlvi) 68
(xlvii) 2015-16
(xlviii) 100
Source: Department of Horticulture, Block Development Office, Nadaun Block, Hamirpur
The production of horticulture crops in the block is showing an upward trend from 2011-12. During
2014-15, the production has gone down due to the natural calamities in the area. After that the
growth has improved in the next year.
(xlix)
(l)
Figure 0-2: Agricultural Area in Nadaun Planning Area
(li)
Source: AGiSAC Base Map 2015
NH – 3
NH
– 3
NH
–
303
8396
jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939
4.4.1.3 Sericulture
Sericulture is another importance sector in the economy of Nadaun. There are two major
Sericulture farms in the planning area. One is located Bela village and the other just opposite Post
Office. Though currently these farms are not in operation, it is proposed to revive these farms to
generate employment and revenue through the interventions of Sericulture Divisional Office-
Nadaun, Directorate of Industries, H.P.
Secondary Sector
Secondary sector is the least prioritized sector in Nadaun Planning Area in terms of occupational
structure and GDDP share.
Secondary sector shares only 3.5% of the total GDDP in 2000-01 which has decreased to 3.2% in
2005-06 and to 3% in 2009-10. This continuous drop of share in district’s GDDP amount clearly
indicates that the sector is not a growing sector in this region.
In case of Nadaun, as there are no manufacturing industries only micro scale repair units and some
household industries are operating at the local level whose contribution to economic development
is negligible.
Tertiary Sector
Tertiary sector or the service sector is the most important sector in the planning area in terms of
occupational structure and share in GDDP amount.
In terms of GDDP share, tertiary sector has the maximum percentage share in the total GDDP since
1999-00. The share of tertiary sector in 2000-01 was 78% of the total GDDP of Hamirpur district
which have increased to 84% in 2005-06 and to 87% in 2009-10.
The main activities in tertiary sector in Hamirpur District are constructions (54%), trade and hotels
(16%), banking facilities (11%), public administration (10%) and Transportation (7%).
Figure 0-3: Share of Activities in Tertiary Sector
Source: Economic Survey, 2005-06
Most of the employed people in Nadaun Planning area are engaged in Private services (43%) or
own Business (43%), and rest of the people (14%) are engaged in govt. services. (According to the
5% sample survey in the planning area).
8397
jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939
Figure 0-4: Occupation Structure of Employed People
Source: Field/Primary Survey
From the above analysis, it can be concluded that the main priority sector is the tertiary sector
which generates maximum district domestic product and more than 50% of the people are engaged
in various service sector related activities.
4.4.3.1 Trade and Commerce
Nadaun historically has being a trading centre and has commercial-cum-mixed use within the old
town. Nadaun is also known as the ‘Pattan’ town due to its specialized in trading activities.
There are two markets in Nadaun. One is the old market area which is sited at the heart of the town
and another one is the new market which has been set up near the bus stand. The old market area is
basically a whole sale market specializing in wedding ceremony related articles/ items, clothes,
shoes etc. whereas the new market deals in items related to modern day to day articles like
electronics, mobiles, hardware, electrical apart from eateries and general grocery shops.
Commercial activities have also spread along the major spine within the present Nadaun town as
well as along the National highway. Apart from the major commercial facilities, the local shopping
facilities are available within the residential areas to meet the daily needs of the people.
In order to cater to the transit people arriving at the Nadaun bus stand, there are a couple of
restaurants and sweet shops in bus stand area of the new market area also.
4.5
Income Structure
Income structure helps us to understand the range of people’s income in a region. It helps us to
comprehend about the economic capability or purchasing power of the people.
The Figure 0-5 shows that maximum respondents (38%) have the income level between 5000 to
10000 rupees per month. A person with up to 5000 rupees per month income level constitutes 34%
of the total earning sample population. As 72% of the total earning population lie within the two
income groups i.e., up to 10000 rupees per month, it is in consonance with the per capita income of
the state i.e., Rs. 51730 in 2012-13.
Figure 0-5: Income Structure
Source: Primary Survey
8398
jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939
4.6 Employment Generation
Considering that the Development Plan will boost the economic activities within the Planning area
and create more opportunities for work, it has been estimated that there would be at least 5% boost
in the WPR. Thus, the Planning area will have a WPR of 51% by 2035. The worker population
estimated by 2035 will be 8926. The following Table.0-3 shows the break-up of the employment
generated in each sector.
Table.0-3: Proposed Occupational Classification of Nadaun
Sector
Occupation
Number
of
Workers
Percentage of
Workers
Primary sector Agriculture, Forestry and Fishing
3125
35
35
Secondary
Sector
Light Industries and Composite use zone
446
5
10
Agro- based industries
446
5
Tertiary
Sector
Construction Industry
1339
15
55
Govt. offices
893
10
Institutional areas
446
5
Town Centre
446
5
Wholesale Trade (Integrated Freight Complex)
893
10
Transportation Hub
446
5
Retail Sector
446
5
TOTAL
8926
100
Source: Proposed based on Analysis and Trend
4.7
Proposed Work Areas
4.7.1 Light and Service Industries
The town needs an industrial base presently a very limited number of service industries constitute
the industrial sector of Nadaun.
Nadaun broad region would provide the skilled, unskilled and semi-skilled labour required for agro
as well as other light and service industries. Light flatted group industries shall be permitted in the
area demarcated for industries. Industries like Agro-based, Fisheries and Dairy processing,
Furniture making, Engineering Products /Repair and Maintenance etc. are the sectors which is
proposed to increase the Economy.
Thus an area of 10.27 Ha has been proposed in Tillu Khas to be developed as an Industrial Estate.
Mandi/ Wholesale complex
A mandi or whole-sale trade complex is proposed at the junction of NH-3 and MDR-36. The
Development Plan proposes to develop a 1.29 ha new Mandi Complex including Wholesale
Markets at Jalari. This location provides appropriate linkages for the incoming goods, outgoing
goods and distribution of wholesale goods in the town.
This will also include activities closely related to trade like financial institutions, administrative
services, business entrepreneurship, people related retail market facilities and other public
conveniences.
A Vegetable packing house, Cattle Feed Godown and a Cold Storage is also proposed in the town
by TCPD under Annual Administrative Report (2014-15).
8399
jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939
4.7.3 Retail
Retail shopping areas are necessary for creating an image for any town. Presently there are no
organized retail areas in the planning area. To accommodate the required shopping, commercial
offices, and other activities like cinema, hotel and related facilities, the following three-tier system
of commercial development is proposed.
Level I
Town level
Level II
Community level
Level III
Neighbourhood level
4.7.3.1 Level I –Town Centre
One town centre is envisaged and strategically located to serve the town. The town centre is
proposed to be developed at Tillu Pratham village. It will be developed on 5.7 ha of land (2.3 for
commercial and 3.4 ha for public semipublic use).
4.7.3.2 Level II –Community Centre
The Community centers are major shopping complexes, which will comprise of Shops, Weekly
Markets, Post office, Dispensary, Petrol Pump and are also the centers of socio-cultural activities
where the people get together. One Community Center have been proposed in the Development
Plan for a population of 15,000 of an area of about 0.50 hectares.
4.7.3.3 Level III – Neighborhood shopping centers
Within the residential land use, in new developments, two categories of shopping centers shall be
provided:
Sector-level shopping centre-45 to 50 shops for a population of 5000 persons.
Convenient shopping centre-10 to 15 shops for a population of 1000 persons.
4.7.3.4 Informal sector
The informal sector trade and services are scattered within the Planning area. The informal sector
units locate themselves strategically near work centers, commercial areas, outside the boundaries of
schools, colleges and hospitals, transport nodes and near large housing clusters. It is proposed to
integrate the informal sector in trade and services in the planned development.
In all the future developments, 1% of the total area will be reserved for informal sector/ vendor
market development. This area shall have temporary construction not to be included in coverage
and FAR. At appropriate locations, reservations shall be made for night shelters. Attractive design
shall be prepared for the space for stationary and mobile vending.
4.7.3.5 Weekly markets
The weekly markets and haats are a vital characteristic of Indian cities and have a sense rich
cultural identity attached to them. Spaces shall be allotted for weekly markets in the town centre
area.
Site with an area of about 0.4 Ha for weekly markets is included in the town centre.
8400
jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939
5
Housing
5.1
Introduction
The population of Nadaun Planning Area as in census 2011 is 9,912 and the number of Households
is 2219. To understand the housing condition and situation of Nadaun Planning area a survey of 5%
household was conducted in February 2016. 111 household were surveyed. Apart from socio-
economic aspect housing characteristics were also studied.
(lii)
Figure 0-1: Settlements in the Planning Area
Source: Base map provided by AGiSAC
NH – 3
N
H
– 3
NH
–
303
8401
jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939
5.2 Household Size
Nadaun Planning Area has a household size of 4.5 as per Census of India, 2011. Table 0-1 shows
that the household size has decreased from 5.2 in 1991 to 4.5 in 2011.
Table 0-1: Year wise population in the Planning Area
(liii)
Year
(liv)
1991
(lv)
2001
(lvi)
2011
(lvii)
Population
(lviii) 7075
(lix)
8885
(lx)
9912
(lxi)
No. of HH
(lxii)
1348
(lxiii) 1804
(lxiv) 2219
(lxv)
HH size
(lxvi) 5.2
(lxvii) 4.9
(lxviii) 4.5
Source: Housing Census, Census of India
5.3 Housing Typology
There are majorly three type of housing typologies found in the planning area:
Courtyard houses
Row houses/ semi-detached houses
Detached houses
The Nadaun town being an old settlement has majorly courtyard houses with minimal setback and
large courtyard in the centre / towards the rear side used for agriculture, cattle sheds or for other
household activities
With the implementation of TCPD Rules, new houses or redevelopment of the old housing stock is
proposed to be re-constructed in the form of row houses or semi-detached houses depending upon
the area of the residential plot in the Nadaun town.
The rest of the planning area mostly have detached houses apart from abadi areas where courtyard/
row houses and semi-detached houses are also observed.
5.4
Condition of Housing
Census of India has classified the condition of housing into three categories namely good, liveable
and dilapidated. As per Census 2011, 80% of the houses are in good condition, 14% are liveable
and 5% are in dilapidated condition. There is a need of new housing stock to replace the dilapidated
houses and cater to the housing demand of the planning area.
Figure 0-2: Condition of Houses
Source: Census 2011
8402
jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939
5.5
Age of Structure
According to the primary survey conducted 54% of the houses were built more than 20 years ago
and only 23% of the houses are built less than 10 years ago. As Nadaun is an old town most of the
houses are traditional and more than 20 years old.
Figure 0-3 Age of Structure in Nadaun Planning Area
Source: Primary Survey
5.6 Structure Use
The structure use pattern as categorized by Census 2011 shows that, 98% of the total houses in
Nadaun are purely residential and only 2% have mixed use (residential cum other use). The
residential cum other use structures are located in the old market area (Pattan Bazaar) within the
Nadaun town as well as along the National Highway.
5.7 Type of Structures
Census of India was classified into permanent, semi-permanent or temporary based on the type of
material use in construction of wall and roof. In Nadaun, nearly 68% houses are permanent, 23%
houses are semi-permanent and (9%) houses are of temporary structure.
Figure 0-4: Type of Structures
Source: Census 2011
5.8 Building Material
As per primary survey it is observed that about 75% households have RCC roof on their house;
nearly 20% have tiled roof and another 5% have ‘Grass’ thatch, etc., as the material for the roof.
For wall, nearly 91% households have reported use of ‘Burnt brick’ and about 8% ‘Mud / unburnt
brick’. Nearly 89% households have cement flooring and about 11% households have mud
flooring.
8403
jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939
Figure 0-5: Material of Roof
Source: Primary Survey
Figure 0-6 Material of Floor
Source: Primary Survey
Figure 0-7: Material of Wall
Source: Primary Survey
5.9 Dwelling Unit Size
The quality of life of a person depends (among other factors) upon the size of dwelling unit
available to them. According to the Census 2011, 27% of the household live in 2 room dwelling
unit. 20% households live in 3 room dwelling unit. 15% households live in one room dwelling unit.
As the household size for Nadaun is 4.5, for good living conditions at least a two room dwelling
unit is essential. 15% of the households are living in smaller dwelling unit hence, these deprivations
require urgent attention.
Figure 0-8: Dwelling Unit Size
Source: Census 2011
8404
jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939
5.10 No. of Stories
According to the primary survey most of the housing is plotted housing with average plot size
ranging from 500 to 1000 square feet. The structures are predominantly ground floor with a few
buildings having two to three-storied structures.
5.11 Ownership Status
As per Census 2011, 94% of the houses are owned and remaining 5% of the houses are occupied by
tenants, this indicates most of the people of Nadaun are natives and permanent residents of the
town. As the in-migration is increasing in the planning area, there has been an increase in the
demand for rental housing as per the primary survey.
Figure 0-9: Ownership Status
Source: Census 2011
5.12 Housing Need
The demand of housing in the year 2035 is calculated on the basis of projected population,
household size and current housing shortage. The Development Plan proposes to facilitate the
provision of a fully serviced dwelling unit for each family and reduce the gap between housing
shortage and supply through suitable measures.
Table 0-2: Housing Forecast
Population 2011
9,912
Population 2035
17,501
Additional Population 2035
7,589
Household Size
4.5
Additional Housing Need
1,686
Present Housing Shortage - Due to
Dilapidated and Temporary
Structures
311
Total Housing Need
1,997
Source: Estimation based on Census data
The forecast has been based on the following assumptions:
1.
Anticipated population growth as per the growth rates assumed;
2.
Constant annual household formation rate for the entire Planning Area;
3.
Replacement of dilapidated (5%) and temporary structures (9%).
The additional housing units shall be provided in the following manner:
New Residential Developments: 1,686 dwelling units
Infill in existing residential areas: 311 dwelling units
Table 0-3 gives the details of housing needs every five years and shows the housing need zone
wise.
8405
jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939
Table 0-3: Year wise Housing Need
YEAR
Additional Population
Additional HH
Housing Need
2016
1194
265
576
2021
2531
297
297
2026
4029
333
333
2031
5707
373
373
2035
7589
418
418
TOTAL
1686
1997
Source: Estimation based on the Census Data
5.13 Housing Strategy
Planning norms, land use zoning, density, FAR, and building controls have been reviewed for
housing, both in new areas to be opened up development and for redevelopment of existing areas.
In the context of housing strategy, it is essential to optimise utilization of land and space with a
view to increasing net residential density.
There are following aspects that should be focused for new public housing development –
Strategy for Land Assembly/ pooling
Finance and Incentives
Human Resource Management and E-governance
Public Private Partnership and People Public Private Partnership model
Retrofit measures to make the existing building stock energy efficient and to overcome the
various environmental challenges posed by the sector.
Retrofitting of dilapidated houses- In case of dilapidated structures, if structure is below
50 years, it should be retrofitted, if structure is above 50 years, it should be demolished and the
occupants should be relocated.
The additional 1997 housing units can be achievable by the participation of Government
Departments/Agencies and Private Agencies under the following strategies-
i)
State Government should provide proposed developable land in the Development Plan
for government agencies and private sectors.
ii)
Major infrastructures like major roads, water supply lines, sewage layout, power lines
and other basic infrastructure to be developed.
iii) Private sectors should be encouraged to construct new houses with basic infrastructure
as per requirements.
iv) Use of local available building materials should be encouraged by the government.
v)
More development in the central part of planning area to be avoided except the areas
where proposals have been given in Development Plan.
vi) Clearance of Building Plan and Land Development/Layout Plan before construction/
development should be strictly imposed by the Government under the Himachal
Pradesh Town and Country Planning Rules, 2014.
Strict compliance of the Building Regulations should be enforced by the authority, in regard to the
following-
•
Structural Design
•
Structural Design Basis Report
•
Seismic Strengthening/Retrofitting
•
Certification Regarding Structural Safety in Design
•
Constructional Safety
•
Quality Control and Inspection
8406
jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939
•
Structural Requirements of Low Cost Housing
•
Inspection
5.13.1 Housing for Various Income Groups
The Development Plan recommends identification of priorities in dealing with different segments
of the population. Out of the total demand, income category wise demand would be as given in
Figure 0-10. Fixing the priority in dealing with different segments of the population:
1.
H.I.G. and M.I.G. dwelling units shall be provided with only developed land at market price
to cross subsidize the housing for E.W.S./L.I.G.
2.
L.I.G. and E.W.S. should be covered under site and services scheme and finances provided
through various centrally and State sponsored schemes.
Figure 0-10: Housing demand as per income category
Source: Census of India
On the basis of the emerging trend in the proportion of population occupying 1-2 rooms, 3-4 rooms
and 5-plus rooms by comparing the 2001 and 2011 Census data, a distribution in the above
categories for 2035 have been projected as under
Table 0-4: Proposed Distribution of Households by Housing Category
Category
No. of Rooms
Proportion of Households
2001
2011
2035
E.W.S./ L.I. G
1-2
58%
42%
26% (519)
M.I.G.
3-4
29%
38%
47% (939)
H.I.G.
5+
13%
20%
27% (539)
Source: Estimation based on the study
Housing by Various Agencies
On the basis of the above studies, a possible indicative scenario in terms of housing supply by
different agencies emerges as under:
Table 0-5: Distribution of Housing by Supply Agencies
Agency
Housing Categories
E.W.S./L.I.G
M.I.G.
H.I.G.
HIMUDA
80%
20%
-
Employee/Cooperatives
12%
50%
30%
Private
8%
30%
70%
Source: Estimation based on the study
8407
jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939
Employee housing by the government bodies such as HPSEB, IPH, etc. will come up initially
which follows the emergence of cooperative societies by the Private developers and Builders in the
future.
6
Traffic and Transportation
6.1 Road Network
Nadaun Town, located at the north-western side of Hamirpur district, is accessible by two NHs viz.,
NH-3 (known as Atari-Manali Highway) which connects Nadaun with Amritsar-Jalandhar-
Hoshiarpur-Hamirpur-Mandi-Kullu and NH 303 (known as Nadaun-Nagrota Road) which connects
Nadaun with Nagrota via Ranital-Jwalamukhi. Nadaun is well connected with Sujanpur, the Tehsil
headquarter of the neighbouring Tehsil by MDR-36.
6.2 Road Inventory
About 5.24 km and 1.52 km of NH-3 and NH-303 passes through the planning area respectively.
Out of the total length of NH passing through the planning area, 2.02 km stretch of NH-3 and 0.86
km of stretch of NH-303 act as the urban road in Nadaun town. The NHs are two lane undivided
roads in the planning area with 1.5m shoulders on the both sides. The NHs have an average ROW
of 10m with 7m carriage way with 1.5m earthen shoulders on both sides used as parking, footpath
and service corridor. There are no walkways inside the planning area and vehicles are parked along
the road. This creates a lot of congestion inside the urban area.
The length of the MDR 36 passing through the planning area is 630m. It is a single lane road with
5m carriage way and 1m earthen shoulder at both ends.
The roads in the planning area have been made according to required standards set by NHAI and
IRC.
6.3 Road Condition
The road condition in the planning area is satisfactory in terms of the materials used for the
construction of roads and the level of maintenance.
The roads in the planning area are constructed and maintained by multiple authorities. NHs are
maintained by NHAI which are entirely metalled roads. However, some portions near Gagaal
(almost 200m to 400m) are under construction that creates delay in the traffic movement and
produces dusts which reduces the visibility. The MDR and ODRs are maintained by PWD. Under
PWD, 93% roads are metalled and rest are non-metalled roads.
The other urban roads are maintained by PWD and Nagar Panchayat while the village roads are
maintained by PWD and respective Gram Panchayat.
Three types of roads can be seen in Nadaun Nagar Panchayat in terms of material used i.e.
Bitumen, Concrete and Earthen roads. Out of the total roads, 90% are made of concrete, 7%
bitumen and 3% earthen. The 3m (10ft.) wide roads/streets are mainly bitumen made. All the
bituminous roads in the Nagar Panchayat Area are 3m wide.
8408
jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939
The following table shows the different types of roads in Nagar Panchayat Area and their lengths
and width.
Table 6-1: Village Roads, Nadaun Planning Area
S.
No.
Village Name
Length of the Roads
as per Base Map(In
Metres)
Remarks
1
Kot
6330.37
Both side drains on 0.9-1.0 km of road
length
2
Seri
4759.90
Both side drains on 500m of road length
3
Dolee Gharan
1259.49
-
4
Nagarada
2404.46
-
5
Kuthar
1710.19
1000m Kutcha road
6
Bharmoti Kalan
3892.25
Both side drains on 3000m of Kutcha
road
7
Jalari Saunkhlan
1186.49
Construction of both side drains in
progress
8
Harmandir
Mandiala
2199.32
Kutcha drains
9
Harmandir
Rukwalan
381.75
Kutcha drains
10
Bela
11801.73
300m of Pucca drains rest Kutcha
11
DPF Kuthar
651.21
-
12
DPF Tillu
1441.42
500m of pucca road rest Kutcha
13
Tillu Pratham
9.93
500m of kutcha road rest pucca
14
Tillu Khas
2776.61
500m of kutcha road rest pucca
15
Gagaal
621.82
500m of kutcha road rest pucca
TOTAL
41426.94
Source: Sub-divisional Office, PWD, Nadaun
Figure 6-1 Types of Materials
Source: PWD office, Nadaun
8409
jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939
Table 6-2: Roads Maintained by Nagar Panchayat
Source: Nagar Panchayat, Nadaun
As per the residents during the primary survey, during rainy season the un-metalled roads create
problem for pedestrians as well as vehicle users the. The rolling topography reduces the durability
of the earthen roads.
6.4
Vehicle Growth
Vehicular growth rate in the region puts light on the fact of future traffic pattern. Increase in the
number of private vehicles envisages the increase in the traffic volume in the town. It would put
more pressure on the existing roads and creates congestion on a larger run if necessary measures
are not taken.
The, depicts the average annual growth rate is 9% from 2011 to 2015. The highest growth rate was
experienced in 2013. After that, there is a steady fall in overall vehicle growth till 2015.
The maximum registered vehicles are mainly the two wheelers (71%) and cars (21%).
Tractors, HGVs, three wheelers and others fall in the remaining (8%). This clearly illustrates the
local roads occupied by the two wheelers and cars. The percentage of buses is very less. Only 18
buses have been registered in the last five years.
Types of
Roads
Length of different roads
Total Length (km)
Percentage
3m (10ft)
2.5m (8ft)
1.8m (6ft)
Bitumen
1.31
-
-
1.31
7.29%
Concrete
2.20
5.50
8.48
16.18
89.99%
Earthen
-
0.18
0.31
0.49
2.72%
Figure 6-2: Vehicle Growth, 2011 to 2015
Source: SDM Office, Nadaun
8410
jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939
6.5
Existing Traffic Scenario
Traffic survey has been conducted for 12 hours for three days in February 2016 in Nadaun Planning
area to understand the traffic scenario in and around the planning areas. The surveys have been
conducted at three outer cordons on NH-3 and NH-303 to capture the through, outgoing and
incoming traffic. The two types of surveys conducted viz., Origin and Destination survey and
Traffic Volume Count Survey has been conducted for assessment of passenger and freight traffic
and to measure Level of Service respectively. The traffic survey was conducted at Beas Bridge on
NH-3 and near Jalari village on NH-303 and at Amb Road again on NH-3.
6.5.1 Traffic Pattern
(53%). About 24% of total trips terminate at Nadaun and another 19% trips are generated from
Nadaun. The share of trips within Nadaun account to only 4%. This is to be noted that the planning
area gets maximum through traffic daily.
6.5.2 Traffic Volume
The volume of traffic is highest at cordon point 1 i.e. the Beas Bridge point (6609 PCUs) which
connects the Kangra district with Hamirpur district. Thereafter the traffic gets bifurcated into two.
One goes towards Hamirpur-Sujanpur-Bilaspur and then towards Shimla and another goes towards
Amb-Una and then to Chandigarh. This is the reason, cordon point 2 and cordon point 3 get half of
the traffic volume than of cordon point 1. i.e., 4384 PCUs and 5564 PCUs respectively.
6.5.3 Modal Split
There is maximum two wheelers (44%) share followed by car (35%) and. HMV (passengers) i.e.
the buses follow after two wheelers and cars with average share of 6% at three different points.
LMV (goods) and HMV (goods) account for 6% and 5% to the total modal share respectively.
6.5.3.1 Level of Service (LOS)
The Level of Service (LOS) of two lanes highway with earthen shoulders has been presented in
Table 6-3.
Figure 6-3: Vehicle classes
Source: SDM Office, Nadaun
8411
jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939
Table 6-3: Level of Service in terms of Traffic Volume
Days
Traffic Volume in PCUs
at Point 1
V/
C
Level
of
Servi
ce
Traffic Volume in PCUs
at Point 2
V/
C
Level
of
Servi
ce
Traffic Volume in PCUs
at Point 3
V/
C
Level
of
Servi
ce
Day 1
7609
0.7
2
(C)
4447
0.4
8
(A)
6243
0.6
1
B
Day 2
9083
4163
5765
Day 3
3134
4541
4685
Avera
ge
6609
4384
5564
Source: Primary Survey
Cordon point 1 i.e. Beas Bridge which connects Nadaun with Kangra district has category C Level
of Service. Cordon point 2 i.e. the Jalari road which connects Hamripur has category A Level of
service and cordon point 3 i.e. the Amb road which connects Nadaun with Amb and Una has
category B Level of Service.
As per the present Level of Services, the Nadaun-Amb section of the NH-3 passing through the
Planning Area has a stable flowing, at or near free flowing traffic. The ability to maneuver through
lanes is noticeably restricted and lane changes require more driver awareness. Most experienced
drivers are comfortable, roads remain safely below but efficiently close to capacity, and posted
speed is maintained.
The Nadaun-Hamirpur section of NH-3 is reasonably free flow. Traffic speeds are maintained,
maneuverability within the traffic stream is slightly restricted. Motorists have a high level of
physical and psychological comfort.
The Nadaun-Nagrota section of NH-303 passing through the planning area has free flowing traffic.
The traffic flows at or above the posted speed limit and motorists have complete mobility between
lanes. Motorists have a high level of physical and psychological comfort.
8412
jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939
Figure 6-4: Present Level of Service of Different Roads
Source: Analysis based on Traffic Survey
8413
jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939
Table 6-04: Level of Service Criteria
Level
of
Service
Description
V/C
A
Free-flow conditions with unimpeded maneuverability. Stopped
delay at signalized intersection is minimal.
0.00 to 0.60
B
Reasonably unimpeded operations with slightly restricted
maneuverability. Stopped delays are not bothersome.
0.61 to 0.70
C
Stable operations with somewhat more restrictions in making mid-
block lane changes than LOS B. Motorists will experience
appreciable tension while driving.
0.71 to 0.80
D
Approaching unstable operations where small increases in volume
produce substantial increases in delay and decreases in speed.
0.81 to 0.90
E
Operations with significant intersection approach delays and low
average speeds.
0.91 to 1.00
F
Operations with extremely low speeds caused by intersection
congestion, high delay, and adverse signal progression.
> 1.00
Source: Transportation Research Board, Highway Capacity Manual
6.5.4 Trips
Commercial and Business trips accounts for 67% of the total freight trips in the Planning Area
where as social trips account for the maximum passenger trips (80%).
Almost 80% of the internal trips i.e., within Nadaun are completed within 15minutes time period. It
indicates the work place or other level of services are not very far from the houses in the Planning
area. Most of the trips are generated from Nadaun Town and Beal village (64%) and terminated in
Nadaun Town, Gagaal and Jalari (70%). Out of the total internal to internal trips, 59% trips are
made for business purpose and 41% trips are made for work purposes.
Figure 6-5: Mode of Transport Usage
Source: Primary Survey
8414
jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939
Out of the total household trips, 65% people walk to the destination whereas 15% use public
transport (bus) to commute to destinations, 13% use two wheelers and 5% use cars. Very few (2%)
use cycles as a mode of transport.
6.6
Public Transport System
Nadaun town has efficient intercity public transportation system. Public transport is used for
commuting to long distances like Kangra, Hamirpur, Amb-Gagret, Sujanpur, Dhera, Shimla,
Chandigarh etc.
The transportation within Nadaun and surrounding areas is based on privately and government
operated buses. Nadaun has a large bus station (bigger compared to towns of similar size in this
area). A taxi stand is adjacent to it where one can easily rent a taxi for commuting short or long
distances.
6.6.1 Bus
Bus is the main mode of public transport in Nadaun. The town is well-connected with important
towns and centres within and outside state by govt. roadways (HRTC) and private buses, Nadaun
has a designated bus terminus located in the centre of the city at Inderpal Chowk.
Buses are available in every 20 to 25 minutes for the neighbouring towns, located within 50km. like
Hamirpur, Sujanpur, Amb, Una, Jwalamukhi, Galore, Kangra etc. Towns located within 100km,
have bus connectivity in every 60 to 90 minutes. Towns sited beyond 100 km. have bus services
twice or thrice from the town. There is also a Volvo bus service operated by HRTC with connects
Nadaun with National Capital of Delhi daily.
There is no intra-city public transport system in Nadaun.
6.6.2 Ferry
Though Nadaun does not have a well-developed inland waterways system. But, there are two row
boats which ferry people across the Beas River. Such facility is available on two sides of the
planning area. One on the north-western side near Pattan Bazaar adjacent to present day SDM
Office and the other on the north-eastern side near the Nadaun Fort. There is a nominal fee charged
to ferry people from one side to the other.
6.7 Parking Facility
There is no designated-on street or off-street parking spaces available in the town or the planning
area. The taxi drivers mainly park their vehicles at the Kharidi Ground near the bus stand. The
Kharidi ground is used primarily for commercial vehicle parking only. The private vehicles are
parked all along the main arterial road. This on street un-regularized parking creates congestion in
the town and hampers the traffic movement.
6.8 Pedestrian Pathways
There are no designated pathways for the pedestrian movement in the town. The 1.5m shoulders at
both ends are used as pedestrian’s walkways. Most of the time these shoulders are encroached and
used as the parking space. In absence of the designated walkways in the town and planning area,
pedestrians use carriage ways for the movements which often leads to accidents.
8415
jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939
Pedestrian pathways are required in the town and the planning area because most of the trips are
made through walking. From the primary survey, it has been seen that 87% of respondents make
one trip (internally mostly) per day in the planning area. More than 65% of the sample household
trips are made through walking. This is the reason that pedestrian pathways are very much required
infrastructure in the planning area.
6.9
Issues and Concerns
The issues related to Traffic and Transportation are as follows:
a.
Some of the stretches of the metalled roads are very bad in condition which is not motor
able and produces lots of dust that reduces the visibility.
b. No designated parking area is available within the town that leads to random parking along
the road which creates congestion inside the town.
c.
No designated pathways are available within the town for pedestrian movement. Pedestrians
use carriage ways for the movement inside the town which leads to the fatal and non-fatal
accidents.
d. The level of service is C for the Kangra connecting road which needs to be modified.
e.
More than 50% of the traffic entering the planning area is through traffic and creates a lot of
congestion inside the town.
f.
No street furniture is available inside the urban area. Due to the unavailability of the street
furniture like signage, traffic lights, zebra crossings, marked carriage ways, illuminating
dividers, street lights the traffic movement gets slowed down and creates congestion.
6.10 Proposals and Recommendations
1.
Considering 5% growth rate as per planning commission projection of traffic (Annexure 3).
The estimated traffic on NH-303 near PWD rest house towards Kangra is approximate
10000pcus which has been divided in approximate half in two directions at the Bus stand
junction one towards Hoshiarpur and one towards Hamirpur.
2.
Traffic on NH-303 near PWD rest house towards Kangra shows that it will cross the
capacity of 2-lane paved shoulder in year 2017. So 4 lane paved shoulder is recommended.
3.
The same traffic will enter in town area and due to highly congested area. A bypass for one
direction traffic (Kangra to Hamirpur).has been suggested as expansion of road in town area
is not possible.
6.11 Proposed Road Network
To improve the regional connectivity as well as accessibility to various planning zones within
Nadaun Planning Area, augmentation of the road network across various planning zones is
proposed with connections to the regional linkages. A system of bypass roads has been suggested
which will provide bypass alignments to regional traffic movement without entering the congested
core areas of the planning area. A by-passes have been proposed i.e. Beas Bridge-right bank of
Beas (outside the planning area) - Nadaun Fort –Tillu Khas-MDR-36 at Jalari Saunkhlan.
Proposed urban road network showing the major Urban Arterials and Secondary Arterials along
with connections from Regional Arterials is shown in the Proposed Land use Map (Map No.
1432/IPD/NPA/P/01) Only higher order arterial roads have been outlined in the new areas while
lower order roads can be suitably developed while preparation of detailed plan.
8416
jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939
6.12 Improvement and Upgradation of the Existing Road Network
It has been found that intersections in Nadaun reach their saturation capacity much earlier than the
links. Also, as intersections are closely spaced within the core area, they contribute more to the
network congestion compared to links. However, both intersection and links require upgradation to
increase the capacity to cope with the existing traffic demand. A general set of recommendations is
listed which can be suitably adopted to upgrade the intersections.
Selected measures for improvement of intersection capacity are listed as follows:
Possible widening and correction of horizontal and vertical alignment.
Installation of traffic signals with appropriate signage at strategic points.
Removal of visual obstruction to increase sight distance and facilitate turning
maneuvers.
Installation of pedestrian crossing preferably grade separated to segregate pedestrian
and vehicular movement at intersections. For at grade pedestrian crossings, the
movement should be synchronized with the signal phases.
The remote and interior parts of the planning area will be on priority for augmentation
of transportation network.
Selected measures for improvement of link capacity are listed following-
Widening of the carriageway, wherever possible.
Creation of pedestrian facilities on both sides to segregate pedestrian and vehicular
traffic flow.
Appropriate railing and fencing arrangement along pedestrian walkways.
Illumination of the road links to facilitate night time movement.
Improvement of the road side drainage channels, not only to create additional road
space but to protect the pavement from deterioration.
Road surface stabilization and appropriate arrangement for cross-road drainage (water
streams and falls).
Restriction of on-street parking along congested links, especially during peak hours.
Installation of traffic signages and signals for pedestrian crossing preferably
synchronized with intersection signals. Some busy links might require grade separated
pedestrian crossings.
6.13 Pedestrian Facilities
The roads in Nadaun have no footpaths for pedestrian movement, which forces the people– forcing
them to move along the carriageway and are prone to accidents.
As walking is the only effective Non-Motorized Transit (NMT) mode, management of pedestrian
facilities can boost significantly the patronage for NMT movement within Nadaun Planning Area
(i)
Walkways at least 1.5m to 1.8m and cycle track of at least 1.5m to 2.0m on both sides of the
carriageway to segregate pedestrian traffic from vehicular carriageway.
(ii)
Complete restriction of on-street parking on pedestrian pathways – even if they are lying
empty.
6.14 Parking Management
Creation of off-street parking facilities at strategic locations, preferably multi-storied is required to
relieve the parking load from the vehicular carriageway and to meet the parking demand.
8417
jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939
There is a need to restrict (completely or partially) on-street parking activity to increase the
capacity of the roads and improve traffic flow.
A parking management plan must be prepared for the entire planning area.
The plan proposes the following:
a)
Parking lots have been proposed on vacant government, land (if available) near
concentrated parking generation zones like market area.
b)
Parking space provision has been incorporated in building bye laws considering its
adequacy in the context of growing vehicle ownership.
Apart from parking of cars, significant numbers of taxi, jeep, LCV and trucks are found to be
parked along some of the links. Idle bus parking should be restricted to dedicated bus stands. Taxi
parking should be encouraged only at certain location where its parking will not interfere much
with the vehicular flow.
7
Heritage and Tourism
7.1
Heritage
Nadaun is a host to a lot of Natural as well as Man-Made Heritage. Nadaun being located on the
bank of Beas River makes a picturesque profile which even attracts the tourists is the most
important Natural Heritage of the town. In terms of Man-Made Heritages, the town is full of such
heritages but now they are in dilapidated condition due to ignorance and non-maintenance.
7.1.1 Natural Heritage
7.1.1.1The Beas River:
Nadaun is placed on the banks of Beas River. A favorite pastime of people of Nadaun is evening
walk to the Nadaun Bridge. There are many restaurants which have come up in this area. This
Bridge provides fantastic views of Beas River and of sunset. This bridge separates Hamirpur
district from Kangra district. Another interesting pastime is river-cruise in a small wooden boat.
One can enjoy this ride the whole day. The boat is still used as a mode of transport.
There is a proposal by the State Tourism Department that on a 16 km stretch from Dhera Bridge to
Nadaun Town would be used for promoting water sports viz, river rafting. It would attract the
tourists in huge number. The river front can be developed nicely for the recreational purposes of
citizens of Nadaun and tourists also.
7.1.2 Man-made Heritage
As Nadaun has a rich history dating back to the 17th century, it has quite a number of heritage
buildings, monuments and structures.
8418
jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939
Figure 0-1: Places of Tourist Attractions, Nadaun
Source: Field Survey
7.1.2.1 Nadaun Fort
Nadaun fort is better known as Amtar-Nadaun fort/ Sansar Chand fort, which was once the royal
residence of Raja Sansar Chand. This Fort attracts visitors by its impeccably done wall paintings
and frescoes. Unfortunately, the fort is in a dilapidated condition but it still manages to put visitors
in awe with its exquisite architecture. It is an ideal place that reflects the rich history of Raja Sansar
Chand and the Katoch dynasty. The fort is in a dilapidated state but still representative of family of
Maharaja Sansar Chand Katoch reside there. The Govt. should acquire, protect and conserve the
premises.
Figure 0-2: Nadaun Fort
Source: Field Survey
Nadaun
8419
jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939
Figure 0-3: Nadaun Fort
Source: Field Survey
7.1.2.2Gurudwara Shri Patshahi Dasvin
It is located in Nadaun town on the banks of Beas River where Guru Gobind Singh camped for nine
days during the battle of Nadaun, between Raja Bhim Chand and Mughal General Alif Khan. Guru
Saheb assisted Raja Bhim Chand and won the battle against Mughal General. The spot later on
converted in a Gurudwara by the order of Maharaja Ranjit Singh. However, the present building
was constructed by Rai Bahadur Baisakha Singh in 1929.
Figure 0-4: Historical Gurudwara, Nadaun
Source: Field Survey
7.1.2.3 Samadhi of Dhyanu Bhagat
Dhyanu Bhagat a true devotee of Maa Jwalaji, offered his own head to the Goddess to prove the
power of Maa Jwalaji to the then Mughal Emperor, King Akbar. The Samadhi to the great devotee
is in Nadaun and an important heritage and pilgrimage site.
8420
jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939
Figure 0-5: Samadhi of Dhyanu Bhagat
Source: Field Survey
7.1.2.4Baoli or Step Wells
There are a number of baolis or step wells in Nadaun which were the major sources of water to the
town. One of the famous step-well is a 105 stepped baoli located along the NH-3 in Gagaal village.
The step-well is now in a very dilapidated state and has been filled with mud. Refer Figure 0-6.
7.1.2.5 Paudiyan or Steps Ghats
There are a number of paudiyan or stepped ghats along the Beas River in the Nadaun town. Few of
the most famous ones are the following:
1. Pattan di paudiyan - located near the SMD office
2. Matta wali paudiyan
3. Kaaji Pattan paudiyan - near Samadhi of Dhyanu Bhagat
These paudiyan are in a dilapidated state and needs to be conserved and preserved due to its
heritage value.
Figure 0-6: Baoli at Gagaal
Source: Field Survey
8421
jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939
Figure 0-7: Pattan Bazaar di paudiyan
Source: Field Survey
7.1.2.6 Lavneshwar Mahadev Temple
This is a famous Lord Shiva temple. It is believed that construction of Lavneshwar Temple was
initiated by the Pandava's. A popular belief about the Shivalinga in the temple is that it grows every
year by a height equal to one grain of rice.
7.1.2.7Shiv temple
Shiva Temple is the oldest temple in Pattan Bazar. People offer regular prayers and worship the
lord Shiva. The temple has become very famous among people over a period of time.
Figure 0-8: Shiv Temple in Nadaun
Source: Site Visit
7.1.2.8Peer Sai Fazal Shah Saheb Grave
There is a mausoleum or shrine of a Sufi Saint Sai Fazal Shah located in Bharmoti Kalan village
which is of religious importance and a prominent tourist destination. According to folklore, Sai
Fazal Shah, a renowned saint in the region, became popular amongst the people. The grave was
built by Sansar Chand, a king of the Katoch Dynasty, who was also amazed by the saint’s power.
8422
jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939
Figure 0-9: Peer Saheb Grave
Source: Field Survey
As per the Hindu calendar, in the last month of Magh or the 2nd week of February, a grant feast
(bhandara) is organised in his honour. During this time, along with wrestling competition.
7.1.2.9 Inderpal Chowk
Nadaun was the home town of a great freedom fighter Shri Inder Pal. To commensurate his
contribution in the freedom struggle, a statue of Shri Inder Pal has been installed at the junction of
the New Bus stand. Also, the junction has been named after him, Inderpal Chowk.
7.2 Tourism
Nadaun is located very near to the Dhauladhar Regional Tourist circuit.
7.2.1 Regional Level
There are many famous and important tourist sites in the vicinity of Nadaun the planning area as
well. They include Sujanpur Tira, Deotsidh Temple, Jwalaji Temple, Mahakaleshwar Temple, Dera
Baba Vadbhag Singh Gurudwara and others.
7.2.2 Planning Area Level
There are many of tourist sites located in and around Nadaun Planning Area (within 30km). Apart
from the heritage structures mentioned above, the following are a few important tourist sites in
Nadaun.
7.2.2.1 Atal Bihari Vajpayee Cricket Stadium
The Atal Bihari Vajpayee Cricket Stadium is one of the famous cricket stadiums in Himachal
Pradesh which is located at the north-east edge of the Planning Area. It is one the important
landmark of the Planning Area. Mostly State level cricket matches are organised in this stadium.
With the establishment of Atal Bihari Vajpayee Cricket Stadium, a lot of students, cricketers,
sportsmen and visitors come to Nadaun to play, watch the cricket match or for training purposes.
This has resulted in a boost of sports tourism and other support activities in the town.
8423
jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939
Figure 0-10: Atal Bihari Vajpayee Cricket Stadium
Source: Field Survey
7.2.2.2 Jwalaji Temple
There are nine different flames within the temple. It is said that centuries ago, a person saw the
flames for the first time and Raja Bhoomi Chandra, the ruler of the area had the original temple
built. The Mughal Emperor Akbar installed a gold parasol and Maharaja Ranjit Singh had the dome
gilded. Across the courtyard is Devi's bed chamber and above the temple is the shrine of Baba
Gorakhnath. This is just 11 km from Nadaun town.
7.2.2.3 Chaumukha
Chaumukha is a famous temple of lord Shiva with a huge four faced image. The temple is located
11 km away from Nadaun town.
These are the places of interest in and around Nadaun town. The main issue is that these places do
not attract tourists in the same quantum as other places of Himachal Pradesh do. Jwalaji receives
the maximum number of tourists as it is one of the shaktipeeths and attracts thousands of pilgrims
every year while the other places of attraction only receive the local tourists.
7.3 Tourism Infrastructure
There are no star category or luxury hotels in Nadaun. Presently, there are only three standard
hotels in Nadaun with 30, 24 and 24, total 78 beds. Apart from this, there is also one PWD rest
house located in the town. There are good number of restaurants and eating joints in and around the
town also. As a small town with limited tourist arrivals, the number of hotels and restaurants are
quite sufficient.
7.4 Tourist Forecast
Himachal Pradesh Tourism Development Corporation (HPTDC) should include Nadaun in the
Dhauladhar Circuit. The circuit shall cover the entire Nadaun area along with nearby tourist
destinations.
It is envisaged that Nadaun will be included in Dhauladhar circuit soon. Simultaneously,
conservation and restoration of Nadaun fort is expected to be taken up on priority for
implementation. Promotion of ABV stadium for sports at national level, will leverage further
tourist activity at Nadaun.
8424
jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939
7.4.1 Tourists Accommodation
Presently there are 78 beds in 3 hotels which caters the inflow of visitors who are coming for the
ABV Cricket Stadium. Considering their will be a change in tourist inflow of about 300%,
additional Hotels and hotel beds needs to be developed during the Plan period. The Table 0-1
shows the number of Hotels and Beds by the horizon year.
Table 0-1: Projected Distribution of Hotels and Beds
Type
Luxury
Star Category
Economy/ Budget
Hotel
2
3
5
No.
of Beds
46
70
118
Source: Projected based on past trend
7.4.2 Tourism Strategies
The Recommendations for tourism development in the Planning area which has been incorporated
in the Development Plan are as follows: —
Preparation of Tourism Master Plan for the Planning area well integrated with existing
tourist circuits in HP state by the Competent Authority.
Development of other tourist circuits by the tourism department in co-ordination with the
private sector.
Development of Tourist Infrastructure in the Planning area.
Promotion of Sustainable Tourism in the Planning area.
The proposed tourist circuits are as follows:
Intra-Town (within)
Inter-Town (between)
Intra-Town
(i)
Nadaun Fort
(ii)
ABV Cricket Stadium
(iii)
Gurudwara Shri Patshahi Dasvin
(iv)
Recreational spaces and Ghats on the bank of River Beas.
(v)
River Rafting on Beas River
(vi)
Peer Sai Fazal Shah Saheb Grave
(vii)
Nadaun Bridge
Inter-Town
1 Dada Siba Temple
2 Chaumukha Temple
3 Jwalaji Temple
4 Baijnath Temple
5 Bir Monastery
6 Murli Manohar Mandir
7 Narvadeshwar Temple
8 Tea Gardens and Factory
9 Saurabh Van Vihar
8425
jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939
10 Ambika Devi Temple
11 Sujanpur Tira
12 Deotsidh Temple
13 Kalanjari Devi
14 Jhanyari Devi Temple
15 Shahtalai
16 Bil-kaleshwar Temple
17 Chintpurni Temple
An “Inter and intra” city Tourist Bus service will be proposed which will provide the
bus service once/twice a week and later will increase the service according to the
tourist demand/response.
To increase the tourist footfall, a yearly or a half yearly local Nadaun fair is proposed
to attract tourist to explore and enjoy the Nadaun culture and history. The fair may
have the local flavour of Nadaun history, their art, culture, tradition, dance, music, etc.
Art and Craft Village (Nadaun Haat) is proposed to be developed near the Fort area to
promote employment opportunity for the people.
River front development on the bank of river Beas is proposed to attract tourism both
for the local and outside tourist, (as in the case of Rishikesh and other cities in India)
Nature walk along the river front
Water sport centre, having various adventure activities like River Rafting, Camping,
Kayaking, Bungee jumping, Mountain Biking, etc., should be proposed so as to
promote tourism sports in these area.
Nadaun fort to be developed as a picnic spot for the people of Nadaun as well as some
part of it will be converted into Museum.
Some other areas of attraction are: -
View point on the hill top
Eco-tourism in DPF Tillu and DPF Kuthar
7.4.3 Infrastructure
The key strategies for boosting tourism sector in the Planning area have been summarized below-
1.
Development of good quality transport and social infrastructure
2.
Development of tourist amenities and services as per international standards.
Development and maintenance of the tourist destinations
3.
Allocation of funds for tourism development
4.
Rehabilitation and sustainable development of tourism sites
5.
Events and festivals leveraging cultural heritage in terms of religion, art and crafts and
languages. Developing the handicraft and handloom haats
6.
Encourage participation from government sectors, civil societies and local
administration
7.
Policy and regulatory support
8.
Tourism awareness programs and workshops may be organized to enhance
sensitization towards tourists and tourism destinations and for sustainable development
and maintenance of tourism sites in the planning area
9.
Basic amenities like clean public toilets, easily accessible telecommunication services,
tourist information centres, banks and currency exchange centres, food courts and
restaurants, hotels and lodges etc. among other services to be provided
10. Quality Hotels, recreation and shopping centres, local transportation, taxi services etc.
8426
jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939
7.4.4 Sustainable Tourism
According to World Tourism Organization, Sustainable Tourism refers to Environmental,
Economic and Socio-Cultural aspects of tourism development.
Eco-tourism is a form of sustainable tourism – all forms of tourism can become more sustainable
but not all forms of tourism can be eco-tourism.
The principles of Sustainable Tourism are: -
Tourism should be blended with local environment and community.
Tourist experiences focuses on existing features.
Local ownership.
Local materials and food.
Conservation of resources.
Figure 0-11: Principles of Sustainable Tourism
Source: www.sustainabletourismonline.com
8
Facilities and Services
8.1
Introduction
The existing social infrastructural facilities has been compared with the URDPFI 2015 Guidelines
to identify the gaps and accordingly propose additional facilities in the Planning area. The existing
infrastructure gap and the future requirements has been estimated, based on the projected
population for 2035.
8.2
Educational Facilities
8.2.1 Pre-Primary Education
There are two government and three private pre-primary schools at rural areas of the planning area.
The schools are located in Harmandir Mandiala, Jalari Saunkhlan, Kuthar, Tillu Pratham and Bela
villages.
8.2.2 Primary Education
There are three government and one private primary schools in the Nagar Panchayat of Nadaun. In
rural areas, there are five government primary schools situated at Harmandir Mandiala, Jalari
Saunkhlan, Tillu Khas, Bela and DPF Tillu. There is one private primary school in Bela.
8427
jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939
8.2.3 Middle School Education
There is one exclusive middle school in Harmandir Mandiala village. Other villages and urban
areas have the senior secondary schools which serve as the middle school as well to the entire area.
8.2.4 Secondary School Education
There are three government and one private Higher Secondary schools in Nagar Panchayat area
which serve as the secondary school in the area. In case of rural areas, two high schools serve as the
secondary schools.
8.2.5 Higher Education
There is a Government Degree College just outside the Planning Area named Sidharth Government
College. It offers course in Arts, Science, Commerce, Business Management and Computer
Applications.
A part from this, there is one general private college in Nadaun Town named Vijay Vallabh
College of Education which provides the Bachelor course in Arts, Science and Commerce subjects.
There is one institute on Pharmaceutical research in the Nadaun Town named Himachal Institute of
Pharmaceutical Research. The institute provides bachelors in pharmaceutical sciences.
Figure 0-1:Himachal Institute of Pharmaceutical
Research Institute, Nadaun
Source: Site Visit
8.2.6 Vocational Education
There is one ITI located at the Sujanpur road named Maa Jwala ITI. It serves a radius of 10-15km
area. It provides courses for electrician and electronic mechanic. There is also a private polytechnic
in Nadaun located in the campus of Vijay Vallabh College of Education.
Figure 8-2: Vijay Vallabh Pvt. ITI, Nadaun
Source: Site Visit
8428
jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939
8.2.7 Proposal
The Planning area has sufficient education facilities to cater the present need of the town. The
additional requirement for future population are based on the URDPFI 2015 guidelines.
There is requirement for three Pre-Primary School and one Primary School in the Nagar Panchayat
area as there are none presently. The higher educational facilities like Colleges and Professional
Colleges are already well distributed in project area and adequate for the future population
envisaged.
Table 8-1: Future demand for Educational Institutes
Name of Facilities
Existing No. of
Facilities
Required No. of
Facilities
Area
(in Ha
Pre-Primary School
5
2
0.2
Primary School
6
1
0.3
Senior Secondary School
5
-
0.0
College
1
-
0.0
Professional colleges
2
-
0.0
TOTAL
0.5
Source: Analysis and Estimation based on URDPFI Guidelines
8.3 Medical Facilities
There are three dispensaries in Nadaun Nagar Panchayat Area one each at Gagaal and Bela
villages. As Nadaun is the Block and Tehsil head quarter of Nadaun Block and Nadaun Tehsil, it
houses the Block Hospital in the town. There is one veterinary hospital in the planning area which
serves the entire Nadaun Tehsil.
With the increase in population and growth of town, there is a great need to make available
sufficient healthcare facilities to the inhabitants of the Planning area. The additional requirement
for health facilities has been based on the URDPFI Guidelines.
The existing and proposed health facilities has been listed below.
Figure 8-3: Sub-Divisional Veterinary
Hospital
Source: Site Visit
8429
jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939
Table 8-2: Future demand for Healthcare Facilities
Name of Facilities
Existing No. of
Facilities
Required No. of
Facilities
Area (in Ha)
Dispensary
5
2
0.040
Family Welfare Centre
0
3
0.150
Nursing Home
0
1
0.075
Hospital
1
-
0.000
Veterinary Hospital
1
-
0.000
TOTAL
0.265
Source: Analysis and Estimation based on URDPFI Guidelines
One additional dispensary in Bela and Bharmoti Kalan and one nursing home is required in the
entire planning area. Presently there are no Family Welfare Centers available in the Planning area
and there is requirement of at least three centres. Considering the projected population and the
regional Health Facilities, upgradation of existing Block Hospital is proposed. Presently, the
hospital is 30 bedded which is proposed to be upgraded to 100 bedded Hospital.
8.4 Public Facilities
8.4.1 Postal Services
Nadaun Nagar Panchayat has a Sub-Divisional Post office. All the post offices and sub-post offices
of Nadaun Tehsil come under it. Apart from these, post offices are also located at Jalari, DPF Tillu
and Bela villages. The sub post offices are located at Bela and Tillu Pratham Villages.
Table 8-3 Future demand for postal services
Name of Facilities
Existing No. of
Facilities
Required No. of
Facilities
Area
(in Ha
Rural Post Office
3
-
0.00
Sub Post Office
2
4
0.20
Post Office
1
1
0.15
TOTAL
0.35
Source: Analysis and Estimation based on URDPFI Guidelines
There is a requirement of two Sub Post office in Bharmoti Kalan and Harmandir Mandiala. Post
office at administrative office already exists in Nadaun town however, one more is proposed in
Tillu Khas.
8.4.2 Telecommunication Services
The villages in the Panning area and the Nadaun Town is connected by the land line telephone
network. The broad band connectivity is also there in the town and some of the villages have the
internet connection as well but network connectivity is poor in rural areas. There is one telephone
exchange in the Nadaun Nagar Panchayat which is enough to serve the projected population and
Planning Area.
8.5. Police Services
There is one police station in Tillu Khas and two police booths in the Planning area. One booth is at
the bus station and another one is near Jalari.
8430
jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939
One additional police stations and 3-number of Police posts are required, which shall be distributed
Nagar Panchayat Area, Bharmoti Kalan and Bela.
Table 8-4 Future requirement for security facilities
Name of Facilities
Existing No. of
Facilities
Required No. of
Facilities
Area
(in Ha)
Police Post
2
3
0.30
Police Station
1
1
0.50
TOTAL
0.80
Source: Analysis and Estimation based on URDPFI Guidelines
8.5.1 Safety
8.5.2 Fire Services
There are no fire-fighting stations inside the planning area. The nearest fire-fighting station is
located at Hamirpur town which is 28km from Nadaun. As per URDPFI Guidelines, one fire station
is required to cater to 50,000 population.
If fire breaks out in the planning area there is no facility to tackle the situation immediately. The
necessary help would take at least one hour to reach at the destination.
Thus, a Fire station is required in the Planning Area. Fire Station is proposed along the NH-3 in
Nagarada village.
8.5.3 Disaster Management Centre
Disaster management cell should work under the Sub-Divisional Magistrate officer. Currently, no
such Disaster management cell is operational in Nadaun Sub-division. The area falls under earth
quake risk zone which depicts disaster can hit the area any time.
As per URDPFI Guidelines, one Disaster Management Centre is required to cater to 20,000
population within 5-10 km radius. Since, the Planning area is prone to natural hazards therefore one
Disaster Management Centre has been proposed in Bharmoti Kalan with suitable open area for
parking, temporary shelter etc.
8.6 Socio-Culture Facilities
In terms of socio-cultural facilities, only one banquet hall is existing in the Planning area. The
availability of community facilities in the Planning area is not adequate. There is requirement of
Banquet Hall and Community Welfare Centre.
8431
jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939
Banquet hall and Community Welfare Center is proposed in Nagar Panchayat Area to cater to the
need of projected population.
Figure 8-4: Community Hall
Source: Site Visit
Table 8-5 Future demand for other community facilities
Name of Facilities
Existing No. of
Facilities
Required No. of
Facilities
Area (Ha)
Banquet Hall
1
1
0.10
Community Welfare Center
0
1
0.15
Source: Analysis and Estimation based on URDPFI Guidelines
8.7 Support Facilities
8.7.1 Service Facilities
Distributive Facilities include Food grain Distribution Centre, Milk Booth, LPG Godown, Fuel
Station and Petrol Pumps. Presently there are three Petrol Pumps in the planning area.
In terms of distribution services, the Planning area requires a LPG Godown /Gas Godown and two
Milk booths to meet the demand of 2035 population. These need to be provided for while
preparation of Sectoral Plans.
8.7.2 Cremation/ Burial Ground
As per URDPFI Guidelines, one Cremation Ground is required to cater to 10,000 populations
within 5-10 km radius. The cremation grounds presently functioning in Kot is proposed to be
retained. The cremation ground situated shall continue to function. One more Cremation shed is
proposed, at the same location.
8.8 Sports and Recreation
The Planning area lacks in organised green spaces. The present land allocation for the recreational
facilities is very low in comparison to the growth of the Planning area. Existing open spaces are
generally scattered and are not interconnected.
8.8.1 Recreational Spaces
There are no designated neighbourhood parks in Nadaun and its surroundings. There is a need to
provide for existing as well as for proposed population.
There is only one public park in the entire planning area near Shiv Temple. There is a great need to
provide more gardens, parks, and playgrounds in the area for citizens.
8432
jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939
Figure 8-5:Existing Park in Nadaun Planning
Area
Source: Site Visit
Table 8-6 Future demand for recreational facilities
Name of Facilities
Existing No. of
Facilities
Required No. of
Facilities
Area (Ha)
Housing Area Park
1
3
3.00
Neighbourhood Park
0
2
4.00
City
Parks/
playgrounds/maidan/
exhibition grounds/ cultural gathering
grounds
2
-
0.00
Botanical Garden
0
1
10.0
Recreational complex including zoo
0
1
10.0
Total
27.00
Source: Analysis and Estimation based on URDPFI Guidelines
8.8.2 Neighborhood Level Recreational Spaces
There is one playground near the bus stand known as Kharidi Ground and one maidan next to SDO
office in ward no. 2 where various cultural events like Ramlila and sometimes political/ election
rallies are held. Other than this there are no town level open spaces available in Nadaun Planning
Area. There is a need of the same.
Figure 8-6: Ramlila Maidan
Source: Site Visit
8433
jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939
Additional three Housing Area Parks are required, one in sector. Two neighbourhood parks are
proposed in Nagar one in Panchayat Area and the other one in Bharmoti Kalan village respectively.
Also, Botanical Garden and Recreational Complex Including Zoo is proposed in Tillu Khas
8.8.3 Sports Facilities
There is one cricket stadium in Nadaun where many of the national and state level matches are
held. This is an important landmark of Nadaun town.
Figure 8-7: Atal Bihari Vajpayee Stadium in Bela
Source: Site Visit
As per the URDPFI guidelines four residential play area are required to serve the envisaged
population. The play area will be distributed in each sector. Also, a neighborhood play area is
proposed in Nagarada village in Nadaun NP.
Table 8-7 Future demand for sports facilities
Name of Facilities
Existing No. of
Facilities
Required No. of
Facilities
Area (Ha)
Residential unit play area
0
4
2.0
Neighbourhood Play area
0
1
1.0
Source: Analysis and Estimation based on URDPFI Guidelines
8.9 Green Belt
Nadaun town has large eco-sensitive areas like natural drains and river which needs to be
preserved. The proposal provides for green buffer as Green Belt along the water bodies. A buffer of
25 m along Beas River is proposed and also, development of 2 m green buffer around the natural
drains is proposed to conserve the natural drainage in the planning area.
9
Basic Infrastructure
9.1 Water Supply
9.1.1 Existing Situation
Nadaun Planning Area utilizes both surface water and groundwater to cater to its domestic as well
as agricultural demand for water supply use. Surface water is the major source of water supply for
8434
jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939
the planning area. Water is being supplied to Nadaun Planning Area from Beas River through a Lift
well Water Supply Scheme (LWSS) by the Irrigation and Public Health (IPH) Department. Apart
from the water supply by IPH, water supply need is also met through individual/ community bore
well and hand pumps.
9.1.1.1 Existing Water Supply Schemes
There are three water supply schemes operational in Nadaun Planning Area. All the three schemes
are Lift Water Supply Schemes. One water supply scheme supplies water to the Nagar Panchayat
area while the other two supply water to the Gram Panchayat area.
Under the LWSS Nadaun Scheme (1989-90), a Water Treatment Plant of capacity 0.78 MLD had
been constructed at Kunah Khad but due to multifarious construction activities in the vicinity of the
intake well, the turbidity of river Beas has reached 10,000 ppm during summer and monsoon
season and is beyond treatment parameter. Thus, a new Lift Water Supply Scheme has been
proposed by IPH Department at Village Kaloor by tapping the underground water through tube
wells.
9.1.2 Demand Estimation
CPHEEO Manual norms for Water Supply have been adopted for calculating water demand for
base year, intermediate year and target year.
It is proposed that rate of water supply should be increased to 135 lpcd for residential purposes and
for other purposes, consumption rate as mentioned in CPHEEO Manual.
As per URDPFI guidelines, the water required for firefighting purpose demand on total residential
water demand is 1 – 2 % of total water demand. The transmission and distribution losses are
assumed to be 15 % of the total water demand.
Based on this framework the estimated water demand for various activities in the Planning area is
given below
Table 9-1: Water Demand and Gap
Description
Year
2016
2026
2035
Proposed Population
11106
13941
17501
for Domestic @135 lpcd (MLD)
1.50
1.88
2.36
Commercial Demand (MLD)
0.11
0.13
0.17
Industrial Demand (MLD)
0.09
0.11
0.14
Institutional Demand (MLD)
0.04
0.05
0.06
Floating Demand (MLD)
0.12
0.15
0.19
2% Fire Fighting (MLD)
0.04
0.05
0.06
Total Water Demand (MLD)
1.89
2.37
2.98
15% losses (NRW) (MLD)
0.28
0.36
0.45
Grand Total of Water Demand (MLD)
2.17
2.73
3.42
Existing Supply (MLD)
0.78
0.78
0.78
Gap (MLD)
1.39
1.95
2.64
Source: Estimated based on CPHEEO Manual for Water Supply
The total water demand for base year 2016, intermediate year 2026 and target year 2035 is 2.17
MLD, 2.73 MLD and 3.42 MLD respectively. At present, water is supply does not take into
8435
jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939
account the floating population and firefighting load. Hence to bridge the supply gap, water supply
system need to be augmented to meet the water demand at different stages.
9.1.3 Water Sources and Treatment:
The existing water sources can be used to meet the water demand for the Planning area. Presently,
the existing water treatment plant is required to be augmented as per demand estimation.
Table 9-2: Water Treatment Demand
Description
Year
2016
2026
2035
Total Water Demand (MLD)
2.17
2.73
3.42
WTP Capacity Required (MLD)
2.49
3.12
3.92
Existing WTP Capacity (MLD)
0.78
0.78
0.78
Augmentation required (MLD)
1.71
2.34
3.14
Source: Estimated based on CPHEEO Manual for Water Supply
9.1.4 Service Level Benchmarking
Service level benchmarking have been formulated by the Ministry of Urban Development (MoUD)
with a view to achieving all-round sustainability including environmental sustainability.
9.1.5 Key Issues & challenges
The existing water supply system for the study area is not sufficient to cater even the
existing water demand of the area
Intermittent water supply system
Water losses
Consumers lack awareness for consumption of water
9.1.6 Development Strategies
The present water supply system in project area is intermittent, this is proposed to be developed
into 24x7 water supply system. Decentralization in the distribution system ensures equalization of
supply of water throughout the area. Each decentralized area should have its separate distribution
network served by the elevated and/or ground level service reservoirs. The service reservoirs
should be provided at the highest elevation of the distribution zone, so that the water can be
distributed by gravity for majority of the supply area.
Table 9-3: Service Level Benchmarking for Water Supply System (2016-2035)
Sl.
No.
Services
Ultimate Benchmark
as per MoUD, GoI
Guidelines
Present
Status (%)
Aim to be
achieved in
Long Term
1
Coverage of Water Supply
connections
100%
90%
100%
2
Per Capita Supply of Water
in Project area
135 lpcd
70 lpcd
135 lpcd
3
Extent of Non-revenue Water
15%
NA
15%
4
Extent of Metering
100%
NA
100%
5
Continuity of Water supplied
24 Hours
NA
24 Hours
6
Efficiency in redressal of
customer complaints
80%
NA
80%
7
Quality of Water Supplied
100%
NA
100%
8
Cost Recovery
100%
NA
100%
9
Efficiency in collection of
Water charges
90%
NA
90%
Source: Based on NMSH, MoUD, GoI, 2014
8436
jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939
Present capacity of storage reservoir at entire Planning area is 1.87ML. The required storage
capacity of service reservoirs 0.95 ML per day for the vision year based on 24x7 water supply
system. So, existing service reservoirs can be used to supply water to end users, depending upon
the physical condition.
9.1.7 Fire stations and other fire-fighting facilities
Generally, firefighting network are designed for minimum 50 psi at each node in the system. This
type of network would need to be designed independently or the combined water supply network
for town.
The population size and given extent, it is not economically viable to design a firefighting network
independently or combined, that is fully capable of meeting firefighting requirements.
As a result, it is recommended that the fire-fighting services will be catered through a fire station.
Presently, there is no fire stations inside the planning area. The nearest fire station is located at
Hamirpur town which is 28km far from Nadaun. According to the standards set by URDPFI, one
fire sub-station has to be located within 3-4 km radius with essential residential accommodation
which would serve at least 50,000 people. Thus, a new fire station is proposed along NH-3 in
Nagarada village.
The fire station will have dedicated water reservoir with adequate capacity within its premises
which will be supplied from nearest service reservoir. Fire hydrants on the periphery exclusively
for fire-fighting services should be considered in residential/ commercial/ industrial zones.
Necessary provisions for laying underground/ over ground fire-fighting measures, water lines,
hydrants etc. may be kept. The concerned agencies shall take approval from Fire Department for
fire-fighting measures while laying the services for an area.
As per information received from IPH, Nadaun, one UGR of capacity 10,000 ltr. is proposed for
dedicatedly fire-fighting purpose.
9.1.8 Water Tariff
There is differential water pricing in Nadaun Planning Area. Water tariff for domestic connection
in Nadaun urban area is Rs. 107/- per month while the same in rural areas is Rs. 28/- per month.
From April’2016 onwards, the water tariff in urban area has been revised. Domestic tariff is Rs.
11.40/KL and Commercial connection also follows the differential pricing system with Rs. 22.40
per 1000 litres in urban areas and Rs. 50/- per month in rural area of planning area.
9.1.9 Proposal and Recommendations
1.
Development strategies for improvement and utilization of existing water supply schemes
for the potential demands and adequate supply of potable water in the region.
2.
Detailed analysis of existing water sources and supply system
3.
Detailed designing of water supply system (DPR)
4.
Water supply shall be on 24x7 for equity, effective metering and for best hygiene model of
supply. Leakage detection and thefts can easily be revealed only with a 24x7 supply pattern.
5.
Augmentation of Water Treatment Plant or setup new water treatment plant of 2.40 MLD
by 2026 and additional 1.00 MLD capacity of water treatment plant after 2026 at Bella
villages
6.
100% coverage of treated piped water supply to all users
7.
Replacement or Repair the old/defunct system/network, if any
8.
Streamlining of household connections as well as legalized connections
8437
jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939
9.
Implementation of 100% Consumer metering system
10.
Awareness program for optimization of water use, recycling and recharging
11.
Introducing SCADA system to minimise water losses and theft
12.
Setting up a new Fire Station inside the planning area
13.
Complaint redressal centers to be set up to look after the issues on water supply
14.
Systems should function with minimum interruption and failures.
15.
Use of Recycled water for meeting horticulture, air-conditioning, industrial cooling and
other non-potable uses
16.
Implementation of Rain Water Harvesting Scheme.
17.
Detailed Operation and Maintenance Programme.
9.2 Sewerage System
9.2.1 Existing Situation and Demand Estimation
At present, Nadaun Planning Area does not have any sewage network. The planning area being
situated in a plain to hilly terrain utilise individual septic tanks for sewage disposal.
Taking 80% of total water supply and 10% infiltration as per CPHEEO Manual on Sewage and
Sewage Treatment, Clause 3.6, future sewage generation projected is as follows:
9.2.2 Proposal for Development
An efficient sewerage and wastewater disposal system is of critical importance with respect to
maintaining high standards of health and hygiene in the Planning area. The sewerage system
proposed for planning area aims at the provision of such a facility in a cost effective and organized
manner, by establishing a hierarchical distribution of sewer networks in the urban landscape. The
aim here is to regulate the diameter of the sewerage pipes, which is the costliest entity of the
system, by establishing a distinct hierarchy in the collection system catering to its optimal needs.
Taking 80% of total water supply and 10% infiltration as per CPHEEO Manual, future sewage
generation projected is as follows:
Table 9-4: Sewerage Generation and Gap
Description
Year
2016
2026
2035
Sewage Generation (MLD)
1.71
2.14
2.69
Total Sewage Generation including infiltration (MLD)
1.88
2.36
2.96
STP Capacity (MLD)
1.97
2.48
3.11
Existing STP Capacity (MLD)
1.50
1.50
1.50
Augmentation required (MLD)
0.47
0.98
1.61
Source : Calculated as per CPHEEO Manual
* Proposed 1.50 MLD STP is under construction
9.2.2.1 Sewage Treatment and Disposal
Currently, the planning area generates 1.97 MLD of sewage. Projected sewage generation for 2035
will be 3.11 MLD. Currently, there is no facility for centralised/decentralized collection, treatment
and disposal of the sewage generated operational in Nadaun. However, a 1.50 MLD STP with
sewer network in Nagar Panchayat area is being constructed at the lowest level in the Nallah
between Dolee Gharan and Nagarada.
8438
jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939
9.2.3 Service Level Benchmarking
The service level benchmarks of Sewerage and Sanitation of the planning area has been presented
in the following.
9.2.4 Key Issues & challenges
Wide practice of septic tank in the planning area
Open defecation
Discharge of domestic sewage, rotten food materials and vegetation causing bacteriological
contamination of water
Table 9-5: Service Level Benchmarking for Sewerage and Sanitation (2016-2035)
Sl.
No.
Services
Ultimate Benchmark as
per MoUD, GoI
Guidelines (%)
Present
Status (%)
Aim to be
achieved in
Long Term
1
Coverage of Toilets
100
92
100
2
Coverage
of
Sewerage
Network Services
100
10
100
3
Collection Efficiency of
Sewerage Network
100
0
100
4
Adequacy
of
Sewage
Treatment capacity
100
0
100
5
Quality
of
Sewage
Treatment
100
0
100
6
Extent
of
reuse
and
recycling of sewage
20
0
20
7
Efficiency in redressal of
customer complaints
80
0
80
8
Extent of cost recovery in
sewage management
100
0
100
9
Efficiency in collection of
sewerage charges
90
0
90
Source : Based on NMSH, MoUD, GoI, 2014 and Data Collected
9.2.5 Proposals and Recommendations
1.
As per the gap and deficiency identified in the existing sewerage system of the study area,
an integrated approach is required to cater the sustainable solution.
2.
The project area needs to develop a proper integrated centralized/decentralized sewage
collection and treatment method. A new Sewerage network and 1.50 MLD STP is under
construction, but that need to be augmented to cater the sewerage generate from planning
area.
3.
Detailed designing of sewerage system (DPR). Provision of an efficient sewerage system
throughout the study area needs to be put in place which can be ensured by
Laying sewerage network lines
Sewage treatment needs to be carried out before disposal
To ensure hygienic condition and environmental sanitation
8439
jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939
The storm water drainage system of the planning area should be segregated from the
sewerage network.
4.
All the household/community septic tanks should be connected to the sewer network.
5.
Implementation of Centralized/ decentralized collection, treatment and disposal of the
sewage generated.
6.
Construction of adequate public toilets complex at public places.
7.
Possibilities of recycle/reuse of waste water shall be incorporated in the development plan
to reduce the burden on water supply system.
8.
Reuse options for Treated Wastewater
The outlet water quality parameters after treatment should be in accordance with IS: 10500.
Possibilities of reuse of waste water shall needs to be incorporated in the detailed
masterplan on sewerage system to reduce the burden on water supply system. Treated water
from STP should be recycled as per URDPFI Guidelines and sludge can be used as manure
for agriculture and plantation. It should be aimed to achieve 100% coverage of sewerage
connections to every household.
9.
Detailed Operation and Maintenance Programme
9.3 Storm Water Drainage Network
9.3.1 Existing Situation and Demand Estimation
Topography and natural drainage pattern of the area is from south-east to north-west, north and
north-east. Nadaun Planning Area has two natural water channels namely Beas River on the
northern and north-eastern side and Man Khad on the north-western side. Beas River flows from
north-east to north-west and Man Khad flows from north to south. The surface run off is mostly
toward north and north-west to south. The planning area is not vulnerable to floods.
In addition, there are number of Nalahs which have their outfall into these natural water channels.
These small water channels discharge runoff from the surrounding areas. Most of the drains are in
poor condition which requires de-silting, channelization and lining. The discharge from the Nalahs
flows into the Beas and Man Khad River as four places on the north-west bank of the river/khad
within the Nadaun town.
Nadaun Planning Area has a present road length of 43.32 km while pucca storm water drains are
existing for a length of 29.7 km and the remaining that is 14.85 kms of road length have kuccha or
no drains.
As per CPHEEO Manual on Sewage and sewage treatment, Clause 3.9 and its sub-clauses, Rainfall
intensity calculated from monthly rainfall data of last 11 years comes out to be 81.70 mm/hr.
considering once in 5 years as storm frequency and 30 minutes as Time of concentration. Rational
method was used for computation of run-off, which is recommended for urban areas by CPHEEO–
Drainage Design Manual.
8440
jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939
Figure 9-1: Intensity-Duration Curve
Source: Calculated based on CPHEEO Manual
The planning area is broadly divided into 16 catchments, which is further divided into smaller sub-
catchments. All the major Catchments draining itself to major streams/water bodies. Key feature of
the network is use of natural streams, to minimize the drain section. Several outfalls are proposed in
order to enable safe conveyance of runoff discharge. Two major streams flowing through the
project area receives run off through major catchment basin. The total runoff generated for entire
study is 132.41 cumecs.
9.3.2 Key Issues & challenges
The existing system suffers with the following deficiencies:
Unplanned storm water drainage system
Most of the drains are open
In absence of regular solid waste collection, wastes dumped into the drains, which leads to
choking and overflowing of drains.
The width of the existing drains is further narrowed because of encroachment, causing
obstructions to the free flow of storm water.
Systematic and integrated drainage plan for the study area is not in place.
The natural storm water is mixed with household/human waste which creates environmental
pollution and public health concerns.
The city has poor capacity for effective periodic maintenance of the drains in terms of
cleaning and de-silting.
9.3.3 Development Strategies
As an integrated approach, some of the drains will run alongside of the roads (Roadside Drains)
and others may follow natural slope (Cross Drain). The drains will run along the roads, either one
side or both side as per road camber. All the primary and secondary drains should be covered.
Wherever road of width is greater than 10 m, kerb opening inlets are proposed at every 50 m
interval to provide horizontal entry into the drain. And wherever the road width is less than 10 m
Perforated Cover Slabs are proposed at every 50 m interval.
8441
jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939
9.3.3.1 Rainwater Harvesting
Long term water level declines as a result of careless exploitation of groundwater resource has led
to several problems. Some of these problems are reduced well yields, low water level and leakage
into the aquifer of highly mineralised water. In order to over-come these serious environmental
implications, the recharge potential of groundwater resource has to be given utmost importance.
Rain water harvesting is the technique of collection and storage of rain water at surface or in sub-
surface aquifers, before it is lost as surface run-off.
9.3.4 Proposed Projects
Based on the existing system and gap analysis, there are some potential projects that can be
proposed.
1. Detailed Master Plan for Storm Water Drainage system for further detailed assessment and
solution of drainage proposal Storm water Drainage (SWD) system should designed as a
separate system to carry storm water by gravity for the entire project area. Storm water
drains are designed with a certain gradient, which will create a self-cleansing velocity, as
these drains will carry storm water along with grit, silt and other impurities. All the primary
storm water drains should be designed to have a capacity to carry the total discharge of all
secondary and tertiary storm water drains.
2. Detailed Hydrology study of existing nallahs/ canals/ river for proper flood management
plan and to improve efficiency to cater for storm water drains from collection to outfalls.
3. Detailed designing of storm water system (DPR)
4. Proper outfall structures
5. Existing nallahs running through the study area should be improved to increase the
efficiency of natural channels. Improvement works shall consist of desilting of channel,
development of banks, improvement of side slopes and development of green belt around
the nallahs and provision of culverts at road crossings.
6. It is very important for all upcoming new developments to have rain water harvesting
measures. Even government can improve the urban environment by providing recharge
wells at suitable locations.
7. Regular and proper operation and maintenance of drainage facility is essential to function. It
is also accepted that for quality maintenance of drainage system, optimum use of labour,
equipment and material is required to keep the system in good condition, so that storm
water is efficiently conveyed up to disposal point.
8. Rainwater harvesting system
9. Detailed Operation and Maintenance Programme
9.4 Solid Waste Management
9.4.1 Existing Situation and Demand Estimation
Nadaun Nagar Panchayat looks after the collection and transportation of solid waste in Nadaun
Town. Out of the 7 wards of Nadaun town, there is 100% door-to-door solid waste collection from
Ward nos. 2 to 5 and 80% collection from Ward nos. 1 and 6 while there is only partial collection
of solid waste from Wards no. 7. The primary door-to-door-collection of solid waste takes place
manually through 4 wheel barrows. The areas which are not served by door-to-door collection,
8442
jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939
community bins have been provided by the Nagar Panchayat. There are 7 dumper community bins
of size 4’ x 6’ x 5’and two small dust bins of size 1’x 1’ within the urban area. Loading and
unloading is done manually and waste is transported through a tractor owned by the Nagar
Panchayat. There is no door-to-door collection of solid waste in the rural areas of the planning area.
As per the Nadaun Nagar Panchayat, 8 to 9 quintals i.e., 0.8 to 0.9 MT of solid waste is generated
in Nadaun town per day for people in Nadaun town.
The collected waste in Nadaun Nagar Panchayat area is currently dumped at a solid waste dumping
site on the banks of Man Khad in Nagarada Village. A landfill site has also been proposed by the
Nadaun Nagar Panchayat in the close vicinity of the Dumping Site.
9.4.1.1 Projected SWM Generation and Gap Assessment
The number of waste generating inhabitants as well as collection is assumed to rise to a higher
percentage of the total population. With passing time as a consequence of ameliorated collection
systems the percentages are due to rise in coverage from 0 in 2016 to 100 in 2035 which leads to
increase in daily waste production.
The following table gives estimated solid waste generated in the planning area at the end of the
plan period (2035) and the estimated waste reaching the land fill site.
The following assumptions were considered:
Waste generated per day: 0.25 kg per capita per day.
Solid waste growth factor: 1.33 percent per annum (ministry of urban development
standard).
Quantity of solid waste reaching landfill: 39 percent of total waste (based on national
average).
Table 9-6: Solid Waste Generation and Gap
Sl. No.
Description
2016
2026
2035
1
Population
11106
13941
17501
2
Solid
Waste
Generation
Annual
(tons/day)
2.43
3.48
4.99
3
Annual
Cumulative
Solid
Waste
Generation (tons/day)
2.43
8.82
17.98
4
Existing Treatment Facility (tons/day)
0.90
0.90
0.90
5
Gap (tons/day)
1.53
2.58
4.09
Source : Calculated as per CPHEEO Manual and MoUD Standard
9.4.2 Service Level Benchmarking
Table 9-7: Service Level Benchmarking for Solid Waste Management (2016-2035)
Sl. No.
Services
Ultimate Benchmark as
per MoUD, GoI
Guidelines (%)
Present Status (%)
1
Household
level
coverage of
SWM services through door-to-
door collection of waste
100
10
8443
jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939
Sl. No.
Services
Ultimate Benchmark as
per MoUD, GoI
Guidelines (%)
Present Status (%)
2
Collection Efficiency of Solid
waste
100
NA
3
Extent of segregation of waste
100
NA
4
Extent of MSW Recovered
80
NA
5
Extent of scientific disposal of
waste of landfill sites
100
NA
6
Efficiency
in
redressal
of
customer complaints
80
NA
7
Extent of cost recovery for ULB/
NP/ Authorized agency in SWM
services
100
NA
8
Efficiency in collection of SWM
charges
90
NA
Source : Projections based on NMSH, MoUD, GoI, 2014
9.4.3 Issues and Concerns
The analysis of existing solid waste management practices of study area indicates that the city has
no structured primary and secondary collection, disposal arrangements. Integrated solid waste
management for study area requires the use of various instruments for improved service delivery.
Collection and storage of waste is an important issue which has great impact on the overall solid
waste management system.
Awareness levels in terms of importance of solid waste management has a huge scope for
improvement. Installation of community bins and regular collection and transportation of roadside
wastes to the identified dumping site need to be done.
Segregation of waste needs to be done before transfer to landfill site.
The range of issues that needs to be addressed are listed below.
Effective public participation in segregation of recyclable waste and storage of waste at
source.
Effectiveness of awareness building or direct community involvement.
User Charges.
Waste Minimization and Recycling.
Integrated Waste Treatment.
Regional Sanitary Landfill Facility.
Institutional strengthening and human resources development.
9.4.3.1 Private Sector Participation in SWM at Urban Local Body Level
Given the lack of in-house capability of municipal authorities and paucity of financial resources, it
is desirable to outsource certain services and resort to private sector/NGO participation in providing
SWM services.
8444
jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939
Experience the world over has shown that private sector participation (PSP) results in cost savings
and improvement in efficiency and effectiveness in service delivery mainly due to financial and
managerial autonomy and accountability in private sector operations. Besides, it brings in new
investment and better technologies. In developed countries the private sector manages most of the
SWM services.
In India, by and large, municipal authorities are providing solid waste management services
departmentally. Resistance from labour unions and interpretations of labour laws have discouraged
city administrations from contracting out services to private operators. Of late, some experiments to
privatize certain SWM services have demonstrated improvement in the level of services in a cost-
effective manner.
It is proposed that an integrated Solid Waste Management System as being developed for
Sundernagar cluster, Mandi be developed for Nadaun and surrounding areas.
9.4.4 Proposed Solid Waste Management Projects
For achieving the goal and implementing the strategies various projects need to be undertaken.
Some of the proposed projects are-
An integrated cluster based solid waste management to be developed for Nadaun and
surrounding towns and villages.
100% door to door waste collection.
Waste transfer stations which will include the following:
a) Decentralized compost plants
b) Sorting and recycling yards
Proper Waste collection and transportation.
Segregation of biodegradable and non-biodegradable at source
Resource recovery through sorting and recycling of materials.
Resource recovery through waste processing by using composting or waste to energy
approaches.
Waste minimization by reducing volume, toxicity or other physical/chemical properties of
waste to make it safe for final disposal.
Disposal of waste in an environmentally safe and sustainable manner through land filling.
Recycling of Solid waste
Commissioning of landfilling site.
Integrated management of Solid waste.
Awareness generation for reduce, reuse and recycling of Solid waste
Waste treatment facility Sanitary landfill.
Incineration for treatment of biomedical waste
Information Communication Education (ICE) for solid waste management.
9.5 Electrical Network
9.5.1 Existing Situation
Power is supplied in Nadaun Planning Area by the Himachal Pradesh State Electricity Board
Limited (HPSEBL). Hydroelectricity is the main source of power supply for HPSEB as well as
HPSEB exports power through major transmission lines to various parts in India.
8445
jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939
The power supply of Nadaun town is being managed from 2X16/20MVA, 132/33kV DEHR
substation which is 22.7km (ckM) and from 2X25/31.5MVA, 132/33kV Hamirpur – I Substation
which is 19.4km (ckM) away from Nadaun. The other available power source is Hamirpur-II
(Mattan Sindh) with 3x80/100 MVA, 220/132 kV.
Based on the information collected during site visits, it is found that four no's. 11kVFeeder,
emanating from Gagaal 33/11kV Substation feeding the Nadaun Town area. The details of existing
power infrastructures are as presented in Table 9-8
9.5.2 ower Demand Forecast
Load demand/forecast is the first stage in planning any power system. It serves as an input for the
most critical areas of the power system planning namely, generation, transmission, and distribution
planning and tariff setting. The aim of load forecast study is to provide a comparative between the
projected Peak Demand Load and projected Energy Consumption for the next 20 years. This load
forecasting study will help to propose generation, transmission and distribution expansion programs
on the basis of economic activities and population growth at Nadaun Town
After analysing the data, it is found that the key factors which can affect the load forecast for the
Nadaun town for the next twenty years are as follows:
- Estimation of suppressed demand
- High level of unmetered sale
- High transmission and distribution losses
Table 9-8: Details of existing power infrastructure
Particular
Unit
Details
A. Basic Information
Total Number of Consumers
No.
2143
Total Population (as per 2011 census)
No.
9912
B. Asset Information
Total Number of 33/11 kV Sub-stations feeding the
Project Area
Numbers
1
Number and capacity of Power Transformers
Numbers/MVA
*Not Available
Total Number 11 kV Feeders feeding the Project
Area
Numbers
4
Total Length of 11 kV Feeders
kM
*Not Available
Total Number of Distribution Transformers
Numbers
18
Total Capacity of Distribution Transformers
MVA
2
C. Commercial Information
Unit
FY (2013-14)
FY (2014-15)
FY (2015-16)
Particulars
Energy Input
kWH
18438687
20717767
20948734
Metered Energy Sales
kWH
15070729
16573398
17342013
Assessed Energy
kWH
16694382
17331496
17772591
Total Energy Billed
kWH
15713051
18094294
19387313
Revenue Billed
Rs. lac
86591871
87581543
113951420
Revenue collected
Rs. lac
78186824
84306415
92519284
Billing Efficiency
%
85%
87%
92%
Collection Efficiency
%
90%
96%
81%
AT&C Losses
%
23.05%
15.93%
24.97%
Source: HPSEB
8446
jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939
DETAILS OF EXISTING LOAD DISTRIBUTION AND DISTRIBUTION TRANSFORMERS (FEEDER WISE)
SUBS
TATI
ON
NAM
E
33/11kV Gagaal SS
FEED
ER
NAM
11kV Feeders (Nadaun, Kolah-Sera, Bhumpal, Majheen)
DT
No.
Locati
on of
DT
Rating
of DT
Max Demand
T
ot
al
N
os
.
of
co
ns
u
m
er
Domestic Load (Authorized)
Commercial Load (Authorized)
NDNC
Others Load
Max
Demand
Ad
diti
ona
l
De
ma
nd
due
to
Lo
ad
Gr
owt
h
for
5yr
s
Antic
ipate
d
Max.
Dem
and
at
the
end
of
horiz
on
year
Remarks
1- Ph
Tota
l
1- Ph
T
ot
al
Name
of the
Reven
ue
Villag
e /
Dist.
SS
kVA
kVA
No.
kW
kW
No.
kW
k
W
No.
kW
No.
kW
kW
kV
A
kVA
A
Nada
un
Feede
r
1
Nagar
ada
(NP)
100
181
1
3
0
100
100
100
29
58
58
1
5
0
163
36
217
Feeder wise consumer
details data need to be
rechecked
2
Dolee
Ghara
n (NP)
- VTH
250
372
2
5
1
176
176
176
70
140
14
0
3
15
2
4
335
74
447
3
Seri
(NP) -
Nadau
n
250
1014
7
1
3
531
531
531
175
350
35
0
6
30
1
2
913
203
1217
4
Kutha
r -
Kutha
r I
25
81
6
9
65
65
65
4
8
8
0
0
73
16
97
5
DPF
Kutha
r -
Kutha
r II
25
108
7
6
55
55
55
21
42
42
0
0
97
22
129
6
Bela
100
59
3
9
25
25
25
14
28
28
0
0
53
12
71
B
Kolah
-Sera
Feede
r
1
Bharm
oti
Kalan
-
Bharm
oti I
250
78
6
2
54
54
54
8
16
16
0
0
70
16
93
2
Bharm
oti
Kalan
-
Bharm
oti II
25
47
3
6
30
30
30
6
12
12
0
0
42
9
56
3
Bharm
oti
Kalan
-
Mang
al I
63
27
2
2
20
20
20
2
4
4
0
0
24
5
32
4
KOT
(NP)
100
241
2
0
9
201
201
201
8
16
16
0
0
217
48
289
Overloaded
C
Bhum
pal
Feede
r
1
Jalari-
Saunk
hlan -
Jalari
I
100
150
1
3
5
135
135
135
0
0
0
0
135
30
180
Overloaded
2
Harma
ndir
Mandi
ala -
Jalari
III
63
26
1
5
7
7
7
8
16
16
0
0
23
5
31
3
Harma
ndir
Rukw
alan -
Jalari
II
100
163
1
2
0
93
93
93
27
54
54
0
0
147
33
196
Overloaded
4
Gagaa
l -
Jalari
IV
63
97
7
7
70
70
70
6
12
12
1
5
0
87
19
116
Overloaded
5
Gagaa
l -
Degre
e
Colleg
e
100
66
5
3
50
50
50
2
4
4
1
5
0
59
13
79
D
Majh
een
Feede
r
1
Tillu
DPF -
Tillu
250
77
6
6
63
63
63
3
6
6
0
0
69
15
92
2
Tillu
Khas -
Tillu I
25
8
7
7
7
7
0
0
0
0
7
2
9
3
Tillu
Pratha
m -
Tillu
II
63
70
6
3
63
63
63
0
0
0
0
63
14
84
1952
2863
2
1
4
3
1745
1745
1745
383
766
76
6
12
60
3
6
2577
573
3436
In this study, the settlements have been categorized based on population and urbanization level.
The per-capita or per-household electricity consumption will vary from one type to another
depending on the population growth and the expected future development in each type.
8447
jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939
9.5.3 Key Assumptions in Demand Forecasting
Growth Rate of Energy Input as 4.35%-
Growth rate of Energy Sale as 7.26%
9.5.4 Expansion Proposal:
Based upon the cumulative power usages and growth rate above, the projected load forecasting of
the Nadaun town over the next 20 years is given below table.
Years
2016 -2021
2021 - 2026
2026 - 2031
2031 - 2035
Power Demand
(MW)
3.42
4.5
6
7.98
The estimated power requirement of Nadaun Town till 2035 is 7.98MW. To meet the additional
power requirement till 2035, the addition or augmentation of existing 33/11kV Gagaal Substation
shall be required and addition of new primary and secondary substation with addition/ upgradation
of subsequent distribution networks.
9.5.5 Planning Criteria
The power infrastructure development of Nadaun Town is proposed with HVDS system by
extension of 11kV Network and potential reduction in Low Voltage Network. For implementation
of HVDS system, new 11kv feeder will be created including augmentation and bifurcation of
existing 11kV feeders to improve the quality of power supply and Reduction in distribution losses.
All the consumers are to be feed through energy meters which is RS 485 enabled, with a futuristic
view for implementation of SCADA.
The planning has been optimized to minimize the overall cost. This optimization considers the
numbers of circuits requirement, it`s capacity of distribution and also the location, timing and
additional capacity of the proposed network during operation. The optimization includes an
assessment of cost for OH distribution network considering the impact of projected load growth.
The following critical areas also need to be attended for improve the energy efficiency.
i
Introduction of energy audits and design of energy efficient buildings and network
ii
AT&C losses reduction
iii
Load management techniques and energy accounting
iv
Promotion of new and renewable sources of energy, and reduce demand of
conventional power.
v
Replacement of low efficiency incandescent lamp with LED.
9.5.6 Street Lighting
Roads of the development area shall generally cater to-
i. Movement of goods, persons through vehicles including cyclist/pedestrian.
ii. Basic requirement of road, green area and periphery lighting proposed be as follows:
iii. Adequate level of illuminations for vehicles/cyclist
iv. Uniform illumination level over carriage way with minimum glare
v. Safety of movement
vi. Minimum disturbance during fog/dust conditions
vii. Use of high efficiency lighting fixtures with high lumen output and low power consumption
viii. Beautification and pleasing view
ix. The Street lighting should be provided with LED luminaries on decorative street lighting
poles.
8448
jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939
Table 9-9: Technical Details of Road Lighting System
S.NO.
DESCRIPTION
Upto 18 M WIDE ROAD
(Primary Road)
3.5M WIDE ROAD
(Secondary Road)
1
Area of Installation
Mixed, Residential
Mixed, Residential
2
Pole Mounting detail
Single arm pole on single
side of the road.
Single arm pole on single
side of the road.
3
Lighting Fixture
1 x 72W, LED Light
1 x 40W, LED Light
4
Mounting height
8Mtrs.
4Mtrs.
5
Spacing
25M
30M
9.5.7 Proposals and Recommendations
1.
Flood light to be installed at major junctions within the town viz., Inderpal Chowk,
Gurudwara Chowk, Labour Chowk, Post Office Chowk and near Kangra Co-operative
Bank.
2.
Solar street lighting is proposed to be installed along the road within the planning area.
9.6 Telecommunication System
The telecom services provided in Nadaun are as follows:
i.
Landline operations requiring a telecom cable and junction box space in utility corridor
ii.
Wireless services on GSM / CDMA platform requiring tower at stipulated radii
iii.
Broad band Services requiring a cable corridor and distribution chambers
iv.
Short Coverage Wi-Fi networks
A telecommunication network is proposed to be provided in a manner so as to have connectivity by
different service providers. Consumer can select the services of telecom service provider according
to good quality of network for providing these data and tele communication facilities.
In order to achieve it, Optical fiber cables are proposed to be use to provide and connect various
service providers for telecom as well as broadband services to the users through the optical fiber
network. To run the cabling, the provision for laying the conduit and chamber in front of all the
plots has been proposed.
It is envisaged that all the people will have at least one mobile connection in person and one
landline connection in each house. In addition all the shops, offices industries and other institutions
buildings will have landline connections. Hence, the estimated that the number of mobile
connections would be 19251 and that of landline/ broadband would be 6456. Refer for further
details.
Table 9-10: Telecommunication Connections, 2035
S. No.
Description
Mobile Connections
Landline Connection
1
Population
17501
2
Households
3889
3
Industry
223
4
Govt. Inst.
893
8449
jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939
5
Institutional
112
6
Wholesale Trade
449
7
Retail-cum-shopping
893
8
Floating Population
1750
TOTAL
19251
6459
Source: Estimated based on Housing and Economic Projections
Presently, there is a telephone exchange in Nadaun, which is sufficient to cater to 50,000
population. Hence, for the extension of services to new areas, additional network lines needs to be
laid.
Thus, it is proposed that telecommunication ducts be laid along the roads within the service/utility
corridor with provision of conduit and chamber in front of all the plots.
10
Environment
10.1 Introduction
Himachal Pradesh is enriched with various species of flora and fauna which need to be conserved
and preserved. The development should go hand in hand with environmental improvement and
resource optimization. The sustainable growth can only be achieved if existing environmental
parameters are identified and analysed.
10.2Forest Cover
In Nadaun Planning Area, 13.48% land is covered by forests. It is less than the district average i.e.
21%. The south-eastern portion of the Planning area is under Demarcated Projected Forest (DPF)
cover namely DPF Tillu and DPF Kuthar, located at the both sides of NH-3.
Out of the total forest area, 91.84% is categorized as the Demarcated Protected Forest and 8.16% is
Other Forest. Refer Map E\04 for Forest Cover in the Planning Area. These forest areas shall be
conserved and would function as green lungs Nadaun Planning Area.
The Other forest can be used for collecting forest produce ensuring livelihood for the local people
in the area. Afforestation and regularized tree felling can be promoted for boosting the forest
related economy in the region.
Forest is an important asset to planning area and need to be safeguarded for providing sustained
benefits to the community and diversion of such land to other purpose should be done after careful
examination from social and environmental standpoint.
A buffer around the boundary needs to be maintained as per the HP TCP Rules, 2015. The
minimum distance of 5.00 m from Forest boundary and minimum distance from existing tree shall
be 2.00 m shall be maintained. 19
19 Himachal Pradesh Town and Country Planning (Amendment) Rules, 2015
8450
jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939
10.3 Air Quality
There are no air quality monitoring stations located within 10Km. of the Nadaun town. According
to the CPCB standards there should be an air quality monitoring station near each major settlement.
The air quality analysis cannot be presented as the nearest monitoring station is located at Una
which is almost 71 km from the Planning area.
10.4 Water bodies
10.4.1 Surface Water
The planning area fall within drainage basins of Beas River. The Kunah Khad and Man Khad form
the eastern and western boundaries of the Planning area. There are ample numbers of surface water
sources which are utilized for supplying the potable water to the households.
The quality of water of the Beas River and Man Khad is within the permissible limits. The water is
alkaline in character with high Dissolve Oxygen and low BOD. As per the CPBC standards the
water in both Beas and Man Khad are fit for drinking after disinfection. Refer Table 0-1.
Table 0-1 Water Quality Monitored in between Dhera Bridge and Nadaun Bridge
Indicators
Present
Condition
According to
CPCB Standards
PH Level
8.65
6.5-8.5
DO Level
7.6
6.0
BOD
Level
1.0
2.0
Source: HPSPCB and CPCB Standards
10.4.2 Conservation of Water-bodies
As per the MoEF guidelines20 100m buffer from HFL of the river should be given. However,
Himachal Pradesh being a hilly state where land is scarce, the state has adopted a policy of limiting
buffer to 25mt. No building activity shall be carried out within this 25m buffer protection from the
HFL of river Beas and the same shall be maintained as green buffer zone. The construction shall be
allowed at distance of 3.00 Metre and 5.00 Metre from Nallah and Khad respectively21.
The river front areas may be developed based on proper planning with proper shelter design on the
water expanse with attractive laser shows for tourists and visitors during festive seasons.
Any degradation of wetland or surface water body would lead to habitat loss for birds, aquatic
species and rare vegetation. To check depletion of water bodies the development plan recommends
the following-
Dumping of waste in the water bodies is prohibited
Encourage suitable recreational facility around water body to keep surveillance.
10.4.3 Ground water
20 Since the River Regulation Zone Guidelines are in formulation/ draft stage. Hence, CRZ guidelines have been
referred to.
21 Himachal Pradesh Town and Country Planning (Amendment) Rules, 2015
8451
jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939
Ground water resources and irrigation potential of the region has not been studied and computed as
per the GEC-97 methodology, as the aquifers are isolated and discontinuous in nature. Ground
water quality is within the permissible limit of safe drinking water set by Bureau of Indian Standard
(BIS)22.
Major potential areas for the ground water development are the valley fill deposits, occurring along
Beas River between Sachuhi and Nadaun, lower reaches of Man khad and central part of Kunah
Khad. The aquifer thickness may vary from less than 10 m to about 100 m so far, the valley fills or
fault zones have not been explored or studied on macro level for assessing the potentialities of
ground water resources in the district. Rainfall infiltration is the principal source of ground water
recharge to the aquifer system in the district. Inflow seepages from khads/ rivers also contribute to
the ground water resources/reserves
10.4.4 Rain Water Harvesting
Individuals can do a great deal to improve the water availability and ensure the water quality of
their locality by practicing Rain Water Harvesting as a mandatory measure in all public buildings
as well as judicial use of storm water for agricultural use. In this regard, many published standard
manuals are available for adoption.
10.5 Disaster Prone Areas
10.5.1 Hamirpur District
District Hamirpur is prone to various hazards both natural and manmade. In the district the
geological hazard, mainly earthquakes, landslides and soil erosion are most critical than hydro-
metrological hazard i.e., the flash flood, cloud burst and drought and forest fire.
The disasters, which generally occur in this district and their level of vulnerability is shown in
Table 10-2. According to Hazard Vulnerability of Himachal Pradesh, Hamirpur district has High
threat of Earthquake and Very High threat of forest fire. (District Disaster Management Plan
Hamirpur, 2016).
Table 0-2: Type of disasters in Hamirpur District
Source: Disaster Management Plan Hamirpur, 2016
Table 0-3: Ground Water Quality, Hamirpur District
Indicator
s
pH
EC
μS/cm
at 25°C
HCO
3
Cl
So4
NO
3
F
C
a
M
g
N
a
K
Total
Hardness as
CaCO3
(in mg/l)
Min
8.0
2
280
12
10
1
2
Tr
30
11
7.
5
0.
6
120
22 Ground Water Information Booklet, Hamirpur District, Himachal Pradesh
Hazard Type
Level of Vulnerability
Earthquake
High
Landslide
Low
Floods
Low
Forest Fire
High
Drought
Medium
Cloud Burst
Low
8452
jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939
Max
8.1
7
360
153
12
5
85
22
0.1
6
48
17
14
5.
8
165
Source: Ground Water Information Booklet, Hamirpur District, Himachal Pradesh
Figure 0-1: Earthquake Hazard Map
Source: Department of Environment, Science and Technology, Himachal Pradesh
8453
jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939
In terms of Earthquake hazard risk profiling, almost entire Hamirpur district (91%) falls in Zone V
which is a very high damage risk zone. The last earthquake hit the region in 1905 which took a toll
of death of almost 20,000 people in the region with a magnitude of more than 8 (according to the
Richter scale). The following
Figure 0-1 shows the intensity of earthquake hazard zones in all over Himachal Pradesh.
10.5.2 Nadaun Planning Area
Nadaun Planning area is prone to natural hazard like earthquake. Nearest structural fault line is 600
meters away from northern boundary of planning area. Though there is no structural fault line in
Nadaun Planning area but it is important to take measure in order to avoid earthquake disasters.
However due to unstable sub-soil in the hilly terrain in Bela village, there are few occurrences of
landslides during rainy season near SDM Colony. The area has also been demarcated as landslide
prone area by the administration.
The planning area is also vulnerable to road accidents and fire incidents.
In spite of being located in high vulnerability zone in terms disaster intensity, no such preparedness
mechanisms are observed at individual and community level.
10.6 Measures for Disaster Management
DDMP Hamirpur, 2015 shall be adopted for prevention, mitigation and preparedness plan.
Wide dissemination of earthquake-resistant building codes, the National Building Code 2005 shall
be adopted for earthquake resistant structures.
A Disaster Management Centre has been proposed in Nadaun planning area on 1 ha of land in
Bharmoti Kalan area with suitable open area (2 ha) for soft parking, temporary shelter etc. This
centre would accommodate a Fire Station and Trauma Centre for coordination at the time of
emergencies. The Trauma Centre should be on 1 hectare of land and have a minimum of 100 beds.
This would be linked with lower order Trauma Centres to be provided in selected hospitals
The following policies and strategies for Disaster Management are proposed:
10.6.1 Pre-Disaster Preparedness
The Fire Services department being the nodal agency for disaster management, should
identify vulnerable areas e.g. areas with high density and poor accessibility in the town
and propose suitable measures.
Sensitize people about after effects of disaster particularly school children.
Make people aware through media campaigns and advertisements about emergency
procedures and location of emergency shelters etc.
Undertaking mandatory safety audits on structural designs of Old and New major
building/projects by the respective competent authorities related to all Government and
Private Buildings.
The mock drills to tackle the disaster situations should be arranged under SDM’s
supervision. This should be organised in every local govt. authority (both Gram
Panchayat and Nagar Panchayat) in a particular interval.
Disaster relief Committee should be set up at Gram Panchayat Level and Nagar
Panchayat level where involvement of a particular percentage of female members
would be mandatory.
8454
jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939
10.6.2 Post Disaster Management
It has been observed that any disaster is generally followed by break down of communication lines
and disruption of essential services. Therefore, the key communication centres should be safely
located to be free from natural disasters e.g. flood, fire and earthquake with provision for wireless
and satellite based communication facilities.
Figure 0-2: Tehsil wise forest fire risk area of
Hamirpur district
Figure 0-3: Probabilistic seismic hazard
analysis
Source: Hazard Vulnerability and Risk Analysis
Atlas, Disaster Management Cell, Department
of Revenue, HP
Source: Hazard Vulnerability and Risk Analysis
Atlas, Disaster Management Cell, Department
of Revenue, HP
8455
jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939
Figure 0-4: Location of Lineament and Landslide Prone Area in Nadaun Planning
Area
Source: Bhuvan HP state portal http://bhuvan.nrsc.gov.in/state/HP#
10.7 Forest Fire Measures
Capacity building for the better use of early warning (technical efficiency and HRD): The forest
officials need to be trained in using various indicators to get prior information about forest fire at
the earliest time possible to take timely action. The forest department may be provided with
necessary equipment in detecting forest fire at the earliest possible. Forest officials are to be trained
in using various valuable information, available at national and international levels and translate it
for local use.
Construction of watch towers for monitoring fire incidence is essential and shall be included in
zonal management plan.
11
Stakeholder Consultation
11.1 Introduction
This chapter describes the outcomes of the participatory process adopted for the preparation of the
Nadaun Development Plan. A rigorous stakeholder consultation Programme was adopted to take
inputs of all relevant stakeholders at State, District and Town level. The consultation Programme
was executed at 2 levels as follows: -
Town Level Consultations (Ward wise public consultations, consultations with Nagar
Panchayat, local politicians, Government officers and citizens)
Landslide
Prone
NH 03
N
H
03
NH 303
8456
jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939
Household level consultations (questionnaire survey)
During the Inception stage a number of discussions and meetings were conducted to introduce the
process of preparation of the Development Plan to the citizens of Nadaun. The process of
consultations was continued in all stages.
11.2 Stakeholder Profile
The Stakeholders can be broadly classified as follows:
CATEGORY
STAKEHOLDERS
Town Level
Ward wise public consultations
Members of Nagar Panchayat, Local politicians
Government officers
Citizens
Representatives of health sector
Representatives of Traders and Industrial Associations
Academic Institutes
Representatives of Real Estate Developers
Media
NGOs
Household Level
Local residents
Various stakeholder groups were identified during the Initial Stage of Project. Two core groups of
stakeholders were identified: -
Primary Stakeholders, beneficiaries of a development intervention or those directly
affected (positively or negatively) by it. They include local population (resource persons,
community, students etc.) in the project/program area, poor and marginalized groups who have
traditionally been excluded from participating in development efforts such as kachhi basti and
slum dwellers, and organizations such as NGOs, trader’s organizations, hoteliers and other
associations.
Secondary Stakeholders, those who influence a development intervention or are indirectly
affected by it. They include the borrowing government, line ministry and project staff,
implementing agencies, local governments, civil society organizations, private sector firms and
other development agencies.
11.2.1 Local Steering Group
A Local Co-ordination committee was formed by TCPD. This committee was chaired by the TCP
(Hamirpur).
Table 0-1 Local Level Steering Group
OFFICIAL MEMBERS
Town and Country Planner(Hamirpur)
Chairman
Secretary (NP Nadaun)
Member
Planning Officer (Hamirpur)
Member
Assistant Town Planner(Hamirpur)
Member Secretary
NON-OFFICIAL MEMBERS
Planning Officer (Retd.)
Member
The two main functions of this group are:
1. Eliminating any bottleneck in project progress.
8457
jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939
2. Guidance in Visioning and Policy matters.
11.3 Consultation Programme
Major Issues highlighted by Stakeholders
The major issues in the town highlighted by various stakeholders are listed below.
Date: 25th October, 2016
Venue: SDM Office, Campus Hall
Number of participants: 44
Issues/Suggestions
Environment
1. Alternative new sources of energy should be developed.
2. Open-defecation should be control near the Beas River.
3. For water conservation, the maintenance of Beas River and its buffer area is
necessary.
4. Tree plantation should be initiated every year on fixed target 1,000 trees per
year.
5. There should be development of a botanical garden.
Roads and Transportation
6. There should be installation of solar traffic signals at every main road junction.
7. The encroachment should be removed along the roads.
8. Parking provisions should be proposed at a suitable place or near the Petrol
Pump.
9. Accidents frequently occurs on National Highways because of high speeding
which causes several deaths, so there should be some provisions of traffic signals
and sign boards along the NH at a suitable distance.
10. Pedestrian pathways should be provided within the urban roads.
11. NH road should be four lanes.
12. More connecting roads needed in town.
13. Bus Stand should be shifted near
14. Encroachment of roads and other land should be checked.
Water Supply, Sewerage and Drainage, Electricity and Other Services
15. Fire station should be proposed inside the town.
16. All wards should be provided with piped water supply.
17. Sewerage system should be provided in the town.
18. Advanced water treatment plant should be constructed.
19. Old wells should be repaired.
20. Water stagnation in the Bus Stand.
21. Provision of waste collection Bins at suitable fixed locations.
22. No Drainage System in the town.
23. Nallah should be channelized.
24. Landfill and Dumping sites should be provided for the town.
8458
jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939
Housing
25. Proper arrangement of housing for slum dwellers.
26. All residents living in Kuccha Houses should get Pucca Houses.
Social and Economic Aspects
27. Improvement of Health facilities.
28. Higher Education institutes needed.
29. Educational and Commercial Hubs should be proposed within the town.
30. Horticulture should be encouraged and proposed.
31. Employment opportunities should be provided for the people.
32. A planned Market should be constructed.
33. Community Hall should be constructed in every ward.
34. Good Cinema Halls and public recreation places should be developed.
35. Police patrolling should be increased in all wards.
Tourism
1. Government should promote Nadaun as a tourist place.
2. Paudiyan should be preserved by the concerned authority.
3. Pattan Bazaar should be taken into account for tourism purpose.
4. Heritage sites should be conserved e.g. Nadaun fort, Gurudwara, etc.
5. Town’s image and aesthetic look should be improved to boost tourism.
6. Taxi rates should be notified by Govt.
Governance and Other Aspects
7. Public participation should be ensured in Town Development Planning.
8. Unauthorized development should be stopped in the town.
11.3.2 Proceedings of Town Level Consultation Meeting
A one-day Stakeholders’ Consultation Meeting was held at SDM Office, Campus Hall, Nadaun.
Around 44 people participated in the Meeting.
Meeting Proceedings
The stakeholders appreciated the participants for their contribution in town’s development. He
described various major issues of the town, like in water supply, solid waste management, traffic
and transportation, sewerage, drainage, etc. He talks about the improvement in the public services
like parks and playgrounds, education, health, affordable housing and also talk about the need in
environmental facilities like solar power generation, waste management, Rain water harvesting, etc.
Apart from the above inputs, he also talks about some other facilities which should be proposed in
the city like firefighting department, Children’s playground, vehicular parking area, conservation
and maintenance of various historical paudiyan along the Pattan bazaar till Beas River.
Few raised various issues for town progress. He suggested that there should be a provision of street
light on the police station road and Beas river Bridge, provision of Traffic lights at all the junctions
is an urgent necessity, taxi rates should be decrease and notified by Govt., stray animals are a major
issue for the town hence government should take action and solve this problem.
Outcome of Meeting
8459
jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939
Sectors which needs to be addressed on highest priority were identified.
a.
Sanitation
b. Waste management
c.
Sewerage
d. Drainage
e.
Tourism
f.
Encroachment and haphazard development
g. Economic opportunities
h. Traffic and Transportation
i.
Environment
11
SWOT Analysis
S T R E N G T H
W E A K N E S S
1. Located at a Strategic Junction: The
Planning Area is located at a strategic
junction of NH-3 and NH-303. It has
direct connectivity with all the important
District Head-quarters State Capital
(Shimla), Chandigarh and Delhi by road.
2. High Decadal Growth: Nadaun had
witnessed a higher decadal growth in the
past two decades as compared to the
District.
1.
High Literacy Rate: The Planning
Area has a higher literacy rate of 91% as
compared to that of the District.
2.
Regional Trading Centre: Nadaun
is traditionally a trade town with a very
competitive market Nadaun being a Hub
of Trade and Educational facilities
witnesses
a
huge
daily
floating
population of children, traders and
visitors.
3.
Educational Hub: Nadaun is host to
a large variety of educational facilities
starting
from
primary
to
higher
secondary schools to Degree College to
professional and vocational institutions.
1.
Congested Market: Nadaun is not
vulnerable to water based natural
hazards as such Floods. But, it is highly
susceptible to man-made disasters such
as road accidents (on the NHs) and
stampede (Pattan Bazaar). Fire is
another
hazard
which
is
highly
vulnerable due to small congested
market area.
2.
No Pedestrian walkways: There are
no facilities for pedestrian walkway in
the planning area.
3.
No traffic management in the
planning area which causes traffic
congestion.
4.
No Designated Public Parking
Places.
5.
Inadequate
Public
toilets
in
market.
6.
Inadequate public parks and other
recreational facilities.
7.
Irregular and insufficient Water
supply.
8460
jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939
4.
Rich Agricultural Belt: Developed
on the banks of the River Beas, Nadaun
is rich in agriculture and horticulture
produce especially fresh local vegetables.
5.
Large Forest Cover: Nadaun has
about 1/3rd area under forest including
two DPFs which acts as permanent green
lungs to the planning area.
6.
Cricket Ground positioned at
National Level: Nadaun is host to Atal
Bihari Vajpayee Cricket Stadium which
has the capacity to hold national level
cricket matches.
8.
Poor
Physical
Infrastructure:
Nadaun
has
inadequate
basic
infrastructure facilities like drainage,
sewerage and solid waste management.
9.
Degradation
of
Natural
and
Cultural Heritage
10.
Community Facilities: Inadequate
number
of
community
halls
and
community facilities.
11.
Lack of Disaster Management Cell
in the planning area.
12.
No Fire Station: Even though there
is high risk of fire within the Nadaun
Town, there is no fire station in the town.
O P P OR T U N I T Y
T HR E A T S
1. Huge Tourism Potential
Old heritage structures can be
conserved for promoting heritage
tourism
Riverfront development can be
done to encourage tourism.
Eco-tourism can be introduced
in the green lungs of the
planning area
Cricket stadium can act as a
catalyst for sports tourism.
2. Potential
for
Agro-based
Industrial Base: Nadaun lies in the
agriculture and horticulture belt and
has huge potential for processing
and packaging industries in the
planning area.
1. High Risk of Natural Disasters:
The planning area falls in Zone V
which is a very high damage risk
zone. This might act as a deterrent in
development of this area.
2. High Investments: Development
will involve high cost in laying and
maintaining
infrastructure
for
tourism. Hamirpur being district
headquarter may get more priority
for development as compared to the
Planning area.
13
Development Proposals
13.1 Planning Perspective
The Development Plan caters for three levels namely the Nagar Panchayat, Planning Area and
Influence Zone with a radius of about 20 kilometres. It envisages for the requirements of population
of Planning Area, dependent regional population and tourists during peak season. The proposals
8461
jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939
have been recommended in view of community aspirations, effective role of local bodies, and by
inculcating the participatory approach of private and public sectors. The Development Plan is
contemplated as a document of common man, a document of the public/community and that of the
local bodies, authorities and the Governance.
13.2 Projections
Projections for the Development Plan have been worked out in view of analysis of surveys and
studies and the anticipations emanated thereof on one hand and public aspirations, on the other.
Population of Nadaun Planning Area is anticipated to increase to 17501 by the year 2035. As 51
percent of the total population is anticipated to be workforce, there are likely to be 8926 workers,
for whom provision of work areas is envisaged in the Development Plan.
13.3 Growth Drivers
Locational advantage:
The Planning area is located at a strategic junction point of NH-3 and NH-303. It has direct
connectivity with all the important district head-quarters and state head-quarter of Himachal
Pradesh, Chandigarh and National Capital by road. The villages inside the Planning Area connected
by the village roads. Settlements have been developed in a scattered way inside the Planning Area
due to its terrain and physical attributes.
Emerging Growth nodes and direction of development:
The major growth center is Nadaun town. The direction of growth is along the highway towards
Hamirpur. The growth nodes have been identified in the Planning area based on the Population
distribution, service allocation and exiting connectivity. The growth nodes are the second order
settlements which serve the third order settlements in the Planning area. The identified growth
nodes are located at Bela, Gagaal and Jalari.
Administrative importance:
Nadaun is the sub-divisional head quarter of Nadaun Tehsil. It is also the block head quarter of
Nadaun block.
Education institutes
There are few important education institutes located in the Planning Area near Nadaun Town like
Himachal Institute of Pharmaceutical Education and Research, Him Institute of Fashion Designing,
Vijay Vallabh College of Education, Sidharth Government College, Maa Jwala ITI etc.
Commercial Zone
The town was known as the Pattan or the ferry town. The town is the main commercial hub in the
region.
Places of Interest:
There are various places of interests in and around the Nadaun Planning Area. The Dasvin Patshahi
Gurudwara and Atal Bihari Vajpayee Stadium are located in the Nadaun Planning Area. The
Jwalaji temple is located 11 km north to the Planning Area. The Sansar Chand Fort is located at
Sujanpur which is almost 30 km from Nadaun Town.
8462
jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939
13.4 Development Limitations
1. A large part of land in the planning area is covered with demarcated forest area which
needs to be preserved and conserved.
2. Agricultural land available near the Khad and the River would be retained as rich
agricultural land.
3. About 2.05 ha of land is located at steep slope zone i.e. more than 45˚ which is
completely non-developable.
4. About 120.90 ha of land is under forest which has to be conserved and hence not
available for development.
5. About 27.64 ha of land is under green buffers and water bodies which also needs to be
protected
Thus, 728.80 ha of land is available for development in the planning area. Out of which 132.60 ha
of land is already developed. Hence, the net area available for future development is 596.20. Ha.
Refer Map No. A/05.
13.5 Concept
It is envisaged to develop Nadaun Planning Area as a tourism-cum-trade hub with encouragement
to agriculture. As the planning area has the potential for development of Mandi town due to
pproximity to major agriculture towns and also being the block headquarter. A Mandi zone is
proposed along the National Highway.
The planning area is adequately planned to prevent urban sprawl. The money invested in laying
infrastructure can be recovered from the revenue generated by tourism. Transit zone and mandi can
emerge as an instrument to drive economic growth.
Tourism zone is envisaged to be developed near the Nadaun Fort and Gurudwara Dasvin Patshahi
along Beas River. To provide for the incoming tourists, a hospitality zone is proposed at the centre
of the planning area. All the supporting facilities and amenities will be developed so that it caters to
the tourists.
8463
jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939
13.6 Development Pattern
A visit to Nadaun town reveals that ribbon development is in progress. It may lead to linear
development along with major roads if not planned, regulated and controlled now with statutory
means. There will be a tendency to construct shops, houses right up to the edge of the roads. Some
would even encroach upon the carriage ways. There shall also be a tendency to park vehicles along
roadsides. This shall turn these roads into long tunnels bounded by frequent bottlenecks. A road is
constructed at a huge cost and the society pays a big amount for its maintenance as well as its up-
keep. Laying of road in hill areas is not an easy affair. Therefore, it is imperative to induce future
development not along the main roads, rather away from them by way of sectoral development.
While town-level facilities have been worked out and marked on the Development plan, sites of
sector level facilities shall be specifically proposed at the time of preparing Sector Plans.
13.7 Strategies
(A)
Decongestion of Market Street of core town area
Development of market street precinct of core areas of Nadaun town in order to declutter
them for better pedestrian movement and accessibility through following strategies:
1. Heavy vehicles to be restricted during peak hours, which are primarily for loading and
unloading of goods and be allowed during non-peak/late hours. In case if
loading/unloading is required during peak hours, a systems of loading bays and non-
loading bays must be declared depending upon the high pedestrian traffic movement.
2. Provision of parking zones for 4 wheelers at various places with in range of 300 m
(walkable distance) from the dense area.
Figure 0-1: Development Proposals
NH – 3
NH
– 3
N
H
–
30
3
8464
jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939
3.
Provision of alternate routes for the through traffic to avoid unnecessary congestion.
4.
Segregation of vehicular and pedestrian movement/ circulation by separate pedestrian
walkways on the high-density roads eventually to comfort pedestrian movement and
avoid chaos due to 4 wheelers parked on road sides.
5.
Certain activities generating heavy vehicular traffic (ex. Vehicle repair shops, huge
whole sale stores) must be shifted away from the dense streets.
(B)
Prevention of unplanned Ribbon development
Ribbon development, which is considered as a negative outcome of urban sprawl is
prevalent in Nadaun especially towards the roads radiating out from the town core towards
south – west connecting Amb and south – east connecting Bilaspur. The unintended and
unplanned ribbon growth adjacent to NH-3 needs to be curbed and planned to accommodate
future possibilities by preparation of guideline and regulation for development along NH-3
by the authority to achieve following:
1.
Junctions generating conflicts between pedestrian and vehicular movement needs to be
identified and planned accordingly. Also, activities with large spill over needs to be
relocated from NH towards other low dense streets/roads.
2.
Road stretches where large no of public activities are opening directly on NH should
be provided with a service lane to cater the entrances opening directly on NH.
Alternatively, at these stretches parallel connecting roads to NH can be proposed
where the activities open on the inside roads to congestion on NH.
3.
Provide green buffer belt at the road stretches which are adjacent to agriculture land
and low density residential clusters to curb possibilities of future ribbon development.
4.
Junctions where the arterial roads are connecting the sub-arterial/ secondary road
(town or village road) must be taken special care to avoid conflict.
5.
Major entrances or roads opening/connecting to NH must be at a minimum distance of
300m from each other.
6.
(C)
Development of new urban area in Bela
In Nadaun Planning Area limit, the recent trends in urban sprawl shows that instead of
migration towards Nadaun town (municipal area) the villages are growing majorly within
themselves. The reasons are because of existing and upcoming major public facilities and
amenities.
Cricket stadium in Bela village is an attraction of such importance which is stimulating the
population growth. With certain other features in the surrounding the area is projected as another
centre of importance for urban growth. The following aspects must be considered in framing the
policy and guidelines for integrated development of the area.
1.
The cricket stadium must be developed with other indoor and outdoor sports facilities
to accommodate state level activities and events.
2.
Fort of Nadaun should be notified under list of heritage buildings of state and must be
developed for public use by conserving, restoring or proposing adaptive reuse of the
historical structure.
8465
jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939
3.
Proposed 6 lane road crossing through the area and bypassing Nadaun urban area is
improving the accessibility and connectivity of Bela area. This road stretches and its
junctions must be planned to avoid any future possibilities of ribbon development.
4.
River bed must be used for seasonal adventure water sports activities and is proposed
as start point of 16 km Long River rafting till Dhera Town Bridge.
5.
The recreational area on river edge.
6.
A district level botanical garden adjacent to the proposed road on the river edge must
be developed as part of integrated development of the region.
7.
A 50-100 m of buffer must be kept between the heritage structure and built
development as open and green area with permissible agriculture and recreational
facilities only.
8.
A river side walk way connecting heritage area with the cricket stadium could be
developed for recreation purposes with good public amenities and facilities.
(D) Development of Town level socio - cultural space
Bus stand currently situated in the core town area of Nadaun town is relocated at 700 m
away on NH towards south-west of Nadaun urban area. Its current location is in the urban
centre and lies at the junction which bifurcates the NH with various commercial and mixed-
use establishments. This combination of different activities and better connectivity makes it
feasible for public use of what.
Therefore, the existing bus stand site with hill top at Tillu Pratham adjacent to the main road
must be developed comprehensively for public facilities and recreation. The demarcated
sites can have activities like cinema hall, community hall, town hall, library, open garden,
food and snacks counters and seating kiosks. It can also have complimentary, appropriate
uses like utility and grocery shops, weekly haat etc. for common public use.
(E) Conservation of heritage and natural environment: Natural features in the form of forests
and rivers needs to be conserved. These large ecological greens can be developed for ecotourism.
Here a visit to fragile, pristine, and relatively undisturbed natural areas, intended as a low-impact
and often small-scale alternative to standard commercial (mass) tourism can be conducted.
Conserving the old heritage structure in the planning area and developing a tourist circuit. This will
also improve the economy of the local people.
(F) Provision for physical and social infrastructure: Provide basic infrastructure facilities to all.
Every household in urban area should have water supply and sewerage connection.
Health, education, security, recreational, social and cultural facilities to be distributed throughout
the town.
The development will provide housing and amenities for people and families of all cultures, ages
and incomes.
(G) Resolving Urban issues: Provision of more public spaces and proper utilization of land as it is
scarce resource in hilly areas. Problems of traffic congestion and parking is the most important
urban issue to be dealt with appropriately.
(H) Encourage economic activity:
The upcoming development intends to position itself as an economic engine and generate
employment. The light industrial, trade center, Mandi and promoting agriculture along with a
strong infrastructure base will attract new businesses and entrepreneurs to this development.
8466
jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939
(J) Developing Education hub: The development intends to offers a full range of educational
opportunities for citizens at every stage of their lives. Many schools, colleges and universities will
offer excellent, innovative academics and enhance the human capital of the settlement and region.
An educated, skilled and well-trained workforce will contribute to support the development as the
economic hub of the region and a major competitor for national and international enterprise and
industry.
(K) Affordable housing for all: A slum free town by rehabilitating and providing urban poor
housing.
13.8 Proposals and Recommendations
13.8.1 Housing
In order to cater for the requirements of housing for the anticipated population of 17501 persons in
the Planning Area by the year 2035, at the rate of 4.5 persons per family norm, nearly 3889 families
shall be residing in the planning area. Considering the present housing shortage of 311 dwelling
units, about 4200 dwelling units shall be required by the horizon period 2035. In view of present
trend of low residential density, at the rate of 75 persons per hectare, 104.83 hectares of additional
area is required to cater to the additional population of 7589. As 132.60 hectares area is existing,
therefore, the total developable area by 2035 would be 237.43 hectares including 2.37.hectares of
facilities and amenities.
In Nadaun Planning Area, as the residential development is envisaged to be primarily on the private
lands on one hand and acquisition being not preferred by the land owners, the onus of development
of residential areas vest with them. The land owners are to ensure either planned sub-divisions of
land or land pooling and reconstitution of the plots and accordingly development therein, ensuring
provision of convenient shopping, basic service infrastructure including water supply, sewerage
drainage, electric supply, road and other requisite facilities and services in view of creation of plots.
The owners may construct houses only for their own purpose without exhausting this process. The
housing areas are proposed to be developed by integrating future work areas and evolving
safeguards for forest areas. The proposed housing sectors/ clusters are proposed to be developed on
the neighbourhood principles of self-sufficiency by making provision of requisite infrastructure
therein. The concerned local body/Panchayat will be responsible for ensuring the implementation
of basic services and infrastructure at local level, by raising the resources through process of
undertaking remunerative schemes in the area on land to be got surrendered in its name during the
course of Land Pooling and Reconstitution mechanism. In case of bigger land parcels of vacant
land the same are to be developed by a development agency which has to play an effective role.
13.8.2 Trade and Commerce
The existing commercial area comprising of old bazaar (Pattan Bazaar) and the Main Bazaar and
will continue to function as such. Commercial activity in the developing new areas shall be allowed
in a planned manner only. Following proposals are being made with regard to trade and
commerce: -
9.
There is a need of wholesale and warehousing market (Mandi) for both Fruits and
Vegetable and Grains for the town. The same is being proposed over an area of 1.29
hectares at Jalari at the cross junction of NH-3 and MDR 36.
10. While the main bazaar shall continue to act as the Town Centre of Nadaun town. There
shall be sector-level or cluster level shopping in various sectors of the town. Such
shopping centres shall help ease off pressure on main bazaar. The following norms are
suggested for planning the above-mentioned shopping centres: -
8467
jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939
a)
Sector-level shopping centre-45 to 50 shops for a population of 5000 persons.
b)
Convenient shopping centre-10 to 15 shops for a population of 1000 persons.
11. In order to cater to the envisaged tourist population visiting Nadaun hotel and related
activity is proposed along NH-3.
Nadaun is a traditionally a trade and historic town. In view of increase in trading activities and
boost of tourism in the region, it is proposed to develop a commercial hub at in Tillu Pratham
village along the NH-3 and about 10 hotels shall be required to cater to the tourist population by the
year 2035. The land required for plot @ 350-400 sq.m. area per hotel which includes parking and
circulation area works out to 1.67 hectares. Beside this, an area of 1,84 hectares is required for
Retail Shopping Centre at Jalari, Kuthar and Tillu Khas villages. Thus, total requirement works out
to 8.70 hectares. As existing area under commercial use is 6.88 hectares, therefore, total additional
requirement works out to 1.82 hectares.
13.8.3 Mixed Use
Mixed land use zone has been proposed at strategic location along the NH-3 and NH-303. It
accounts of an area of 2.41 hectares within the planning area.
13.8.4 Industry
There are no industrial unit operating in the town presently. In order to cater for the requirements of
anticipated secondary work force of 893 workers, @ 115 sq.m. area per worker, an area of 10.27
hectares is required for Industry by the year 2035.
It is proposed to develop an industrial estate in Tillu Khas village along the proposed 24m wide by-
pass on about 10.27 Ha of available government land. Non-polluting and non-hazardous small-
scale or cottage industrial units are proposed in the industrial area viz., Handicraft industries, and
agro processing industries.
The existing flour mills as well as saw mills operating within residential buildings (if any) needs to
be shifted from their present location. No floor mill or saw mill shall be permitted within a
residential pocket.
13.8.5 Transportation
An area of 21.83 hectares is under the existing transportation network. Town level, inter-sectoral,
sectoral and cluster roads are required to be developed in the Planning Area.
With increase in traffic it is envisaged that present NH-3 and NH-303 will not be able to
accommodate traffic hence, it is proposed to increase the width of the present NH-3 and NH-303
from present 10 m ROW to 15 m ROW.
As most of the traffic entering Nadaun is E to E i.e., External to External, two by-passes have been
proposed one parallel to NH-3 and NH-303 traversing from the right bank of Beas river and
entering Bela near Nadaun Fort and then entering Tillu Khas village before meeting NH-3 at Jalari
and the other connecting old NH-70 (new NH-3) and old NH-88 (new NH-3) via Bharmoti Kalan at
Jalari. The NH-303 and NH-3 by-passes have been proposed with an ROW of 24 m and the other
by-pass of 15 m ROW.
Three junction improvements have been suggested one at present junction of NH-3 and NH-303
near the Bus stand, another at the junction of NH-3 and proposed By-pass in Bharmoti Kalan and at
the junction of NH-3 with the two proposed by-passes at Jalari.
8468
jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939
A truck terminal is proposed at the cross junction of the proposed by-pass and MDR-36 in Jalari
Saunkhlan. The truck terminal proposed on Government land measuring an area of about 0.62
hectares. The truck terminal has been strategically located in close vicinity of the proposed
Wholesale and Warehousing Centre (Mandi) located on the other side of the NH-3 in Jalari village
as the two activities are correlated and dependent on each other.
Figure 0-2: Proposed Transportation Facilities
The present bus terminal is in the heart of the town in the main market. As per the traffic
projections it is envisaged that the present bus terminal will not be able to accommodate the future
traffic volume of vehicles/people. Hence, a new bus terminal is proposed along NH-3 in an area of
about 0.56 hectares in Nagarada village.
A part from these, new roads of 6m and 9m and widening of important roads have also been
proposed in the planning area
To cater to the town level parking requirement, parking lots and taxi stand have been proposed at
various locations amounting to an area of 1.0 ha. Local level parking requirements of each land use
zone have to be met locally.
8469
jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939
13.8.6 Tourism
The development of tourism in and around Nadaun call for systematic and planned development,
check on encroachments, cleanliness of town, integration and systematic and planned marketing of
tourist destinations in surrounding areas, like Nadaun Fort and other heritage sites within the
planning area and provision of basic amenities at genuine rate.
In order to boost the tourism activity in the Planning Area it is proposed to repair and restore the
Nadaun fort, develop the adjoining area in to a tourist spot with landscaped gardens, pathways and
sitting arrangements. It is further proposed to conduct light and sound show to present the rich
history of the Nadaun Fort.
It is also proposed to develop other heritage sites within the planning area as tourist sites.
13.8.7 Public and Semi Public
An area of 11.33 hectares is existing under utilities, facilities and services. It is anticipated that an
area of 2.35 hectares will be required more for providing various facilities at Regional to Cluster
level in the Planning Area by the year 2035 as per the requirements. Refer Table 0-1.
Table 0-1: Area allocation for various facilities zone-wise
(lxix) Sr.
No.
(lxx)
Facilities
(lxxi) Area
(lxxii) (in Ha)
(lxxiii) 2
(lxxiv) Primary
School
(lxxv) 0.50
(lxxvi) 3
(lxxvii) Dispensary
(lxxviii)
0.05
(lxxix) 4
(lxxx) Family
Welfare Centre
(lxxxi) 0.15
(lxxxii) 7
(lxxxiii)
Sub Post
Office
(lxxxiv) 0.15
(lxxxv) 8
(lxxxvi) Police Post
(lxxxvii)
0.20
(lxxxviii)
9 (lxxxix) Police Station
(xc)
0.50
(xci)
10
(xcii) Fire Station
(xciii) 0.50
(xciv) 11
(xcv)
Banquet Hall
(xcvi) 0.15
(xcvii) 12
(xcviii) Community
Welfare Centre
(xcix) 0.15
(c)
(ci)
TOTAL
(cii)
2.35
Source: Estimated based on URDPFI Guidelines
A Water Treatment Plant has been proposed in Bela along the Beas River for which an area of 0.24
hectares have been provided.
13.8.8 Parks and Open Spaces Use
The town lacks in organised parks and open spaces. Local Parks are therefore, required to be
developed at cluster/sector level. At the rate of standard of 1.00 hectares per 1000 population, 17.50
hectares land is required to cater for population of the Planning Area by the year 2035. As 7.27
hectares area is existing, therefore, 18.92 hectares area is required more. It is proposed to develop
the old Nadaun Fort area into a tourist spot-cum-recreational area with landscaped gardens with
fountains, and conducting light and sound show within it.
About10 hectare land has also been earmarked for proposed Botanical and Zoological Park in Tillu
Khas village.
8470
jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939
13.8.9 Forest Areas
Nearly about 111.06 hectares of land falls under Demarcated Protected Forest use in Nadaun
Planning Area. This has been indicated in the existing land-use map as well as the proposed land-
use map. It is proposed to maintain and preserve all these forest areas. However, due to widening of
Tillu Khas road, the area under DPF has reduced to 109.38 hectares.
13.8.10Water Bodies Use
The land under Water Bodies i.e. 105.51 hectares shall remain without change in land use.
14
Land use
14.1 Introduction
The Existing land use of the Nadaun Planning Area was frozen under section -15A of the H.P.
Town and Country Planning Act, 1977 on 25.10.2016. The existing land use was prepared, notified
and adopted after considering public objections and suggestions. The present Planning Area
includes 11 revenue villages besides, Nadaun Nagar Panchayat.
14.2 Existing Land Use Plan
The existing land use plan has been prepared on the contoured Base Map provided by AGiSAC
(Aryabhatta Geo Informatics Space Application Centre), Department of Environment, Science and
Technology, Shimla. The Base Map has been prepared on World View-2 satellite image having
0.45 m resolution. After interpretation of land utilisation or land cover from the satellite imagery, a
predominant land use survey was conducted to identify the various land uses within the settlement
area.
The land use classification is specified in the URDPFI Guidelines have been adopted for the
planning area.
Of the total land in Nadaun Planning Area (897.39 Ha) only 132.60 Ha i.e., 14.77% is developed
and remaining 764.79 i.e., 85.22% in under developed. Of the total developed land, about 64.32%
is residential area while 5.18% of the land is under commercial use. Transportation which includes
road and other transportation facilities constitutes an area of 21.83 Ha i.e., about 16.47% of the
total developed area. The public and semi-public area and open green area in Nadaun Planning
Area account for nearly 8.55% and 5.48% of total developed area of Nadaun Planning Area.
Table 0-1 shows the land use distribution of Nadaun Planning Area, Nadaun Nagar Panchayat Area
and the land use distribution of developed area of the planning area.
The total Nadaun Planning Area has about 57.51% land under agriculture, 13.48% land under
forest which includes about 12.38% land under Demarcated Protected Forest and 1.10% under
Other Forest. River Beas along with this bank cover about 11.76% of the total area under Nadaun
Planning Area.
14.2.1 Residential Use
It comprises of 85.29 hectares area which works out to be 9.50 percent of the Planning Area. The
residential areas are generally occupied by two to three storied houses. The housing areas are
sprawling along the highways, around the old town, village abadis and in the agricultural fields.
8471
jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939
The old residential localities are along the old Bazar and old Bus Stand in the central area of Seri
and Kot Villages. The new extensions are coming up along the two National Highways particularly
in Bela village. The new SDM Colony has also come up in Village Bela. Residential use intermix
with the commercial use is a common phenomenon. Shops on ground floor on the road side and
remaining structure for residential purpose is a common sight.
Commercial Use
Most of the commercial establishments are located within the Pattan Bazaar, along NH-3 and NH-
303 and in the vicinity of the Main Market at the Bus stand
The commercial use consists of 6.88 hectares which is 0.77% of the Planning Area. The
construction of shops along roads emanating from town is a common phenomenon.
Temporary shops or khokas are located here and there, only a few organised shopping centre can be
seen on NH-303 in front of the Bus stand
Table 0-1: Land use Distribution, 2016
Co
de
Land use Category
Nadaun Planning Area
Developed
Area
Standa
rds (by
URDPF
I)
Area
(in
Ha)
Percentage of Total
Land
Area
(in
Ha)
Percent
age of
Develop
ed Land
1
Residential
85.29
9.50%
85.2
9
64.32%
50-55%
2
Commercial
6.88
0.77%
6.88
5.18%
2-3%
a
Retail shopping and General
Business
1.31
0.15%
b
Warehousing and Service
Sector
5.57
0.62%
3
Public and Semi Public
11.33
1.26%
11.3
3
8.55%
8-10%
a
Facilities and Amenities
11.01
1.23%
b
Utilities and Services
0.32
0.04%
4
Recreational
7.27
0.81%
7.27
5.48%
15-18%
a
Playground/ Stadium/
Sports Complex
5.23
0.58%
b
Parks & Gardens
0.74
0.08%
c
Multi-open Spaces
1.29
0.14%
5
Transportation
21.83
2.43%
21.8
3
16.47%
5-6%
a
Road
21.53
2.40%
b
Transportation Facilities
0.31
0.03%
6
Primary Activity
548.2
1
61.09%
a
Agriculture
516.0
7
57.51%
b
Plantation
22.30
2.49%
Forest
9.83
1.10%
8472
jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939
7
Protected and Undevelopable
Use
216.5
8
24.13%
a
Water Bodies
105.5
1
11.76%
b
Demarcated Protected
Forest
111.0
7
12.38%
TOTAL 897.3
9
100.00%
132.
60
100.00
%
Source: Land use Map based on Base Map prepared by AGiSAC
14.2.3 Public and S
emi-Public Use
Under Public and Semi-Public Use, facilities comprising of education, health, postal, police etc.
including government and semi-government offices occupy an area of 11.01 hectares. The utilities
including water supply, sewerage, electricity, telephone establishments and garbage disposal sites
comprise an area of 0.32 hectares. Thus, total existing land use under public and semi-public use is
11.33 hectares which is 1.26% of the total Planning Area.
14.2.4 Parks and Open Spaces
The organized Parks and Open Spaces are scarce and presently occupies an area of 7.27 hectares
which is negligible of the Planning Area. The citrus trees in the forests within and around the town
are in plenty and the same are serving as green lungs and areas for passive recreation. The town
enjoys unique environmental setting. The ground adjacent to the SDM office is the only space for
organizing cultural activities in the town.
Figure 0-1: Existing Land use Map of Nadaun Planning Area, 2016
Source: Based on Field Survey
NH – 3
NH
– 3
NH
–
303
8473
jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939
14.2.5 Traffic and Transportation Use
The major roads including National Highways and those emanating from the town as well as those
interlinking the different localities have an area of 21.53 hectares. The area under-transportation
facilities such as bus stand is 0.31 hectare, thus, total area under traffic and transportation use is
21.53 hectares, which is 2.43% of the total Planning Area.
14.2.6 Agriculture use
Agriculture land occupies 516.07 hectares which is 57.51% of the Planning Area. The agriculture
land. Apart from this, the planning area has land under plantations which account to 22.30 ha which
is 2.49% of the total land in the planning area.
14.2.7 Forest use
An area of 120.90 hectares is under the forest which is 13.48% of the Planning Area. The 120.90
hectares of land comprises of 111.07 hectares of Demarcated Protected Forest and 9.83 hectares of
other Forest areas.
Water Bodies Use
The area under water bodies primarily rivers, nallahs and Khad is 105.51 hectares which is 11.76
percent of the Planning Area.
14.3 Principles of Land Use Proposal
1.
All the public facilities and amenities as per URDPFI guidelines are majorly
demarcated on the government land and proposals are kept limited up to availability of
land under agriculture land use categories minimizing need for land acquisition.
2.
The development plan caters to the individual growth of the villages/growth centres
and is planned as per the needs of the immediate population by providing all basic
amenities and facilities.
3.
The urban growth by change in existing land use is proposed mostly under agriculture
land use category.
4.
To improve accessibility and to shift traffic from core areas in order to reduce
congestion, few roads are proposed majorly on agriculture land use.
14.4 Land Allocation Mechanism
Allocation of developable land for different uses to meet with the requirements for the next 20
years i.e. up to the year 2035 is made and proposed land-use structure devised accordingly.
Appropriate land uses have been proposed keeping in view the availability of developable land in
each sector, holding capacity in terms of population and activities, existing land use of the area,
development potentials, conformity of land use of its surrounding areas, threshold population for
facilities, locational attributes of amenities, site characteristics, convenient distance of work areas
from residential area, land values etc.
The growth of the 11 villages outside the Nagar Panchayat Area has been envisaged in the vicinity
of existing village settlement based on their projected population. The total additional land area for
development has been worked out based on the gross residential density as 75 pph which accounts
to 101.18 ha.
Out of 897.39 hectares of land within Planning Area, 237.43 hectares (26.46%) is proposed as
developable area whereas 659. 96 hectares of land (73.54%) has been retained as peri-urban area
comprises of Agriculture, Forest, and Water Bodies uses. The 135.90 hectares (15.14%) is
proposed for low density residential use. As the Government land is scarce almost entire
infrastructural development including roads, commercial activities, residential activities, has to take
8474
jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939
place on private land in accordance with population of the area, topographical conditions and
potentials and propensities of land. The land owners, however, resist for any sort of proposal for
community uses and compel the authorities to change the proposals. Approach of negotiated
proposals has, therefore, been envisaged in the Development Plan. Further detailing of proposals
will have to be done in accordance with prescribed zoning and sub-divisions regulations by the
local bodies in primarily built up areas, the Revenue Department and the development agency
through limited land acquisition, land pooling reconstitution mechanism involving land owners in
the new areas.
Uses pertaining to various economic activities like trade, commerce, tourism, industries and income
generating amenities if, segregated and provided separately in patches are unsustainability.
Similarly, facilities and services like schools, nursing homes, banks, telephone exchange and other
financial institutions also needs to be close proximity of the habitation. On the contrary,
Government and Semi-Government Offices, Postal Facilities, Police Service etc. are essentially
town level facilities which can be at a central location away from the habitation as well. The
Development Plan, therefore, addresses the central and local activities for town level/regional and
sectoral pursuits respectively. The related requirements thereof including parking, parks, open
spaces and circulation networks are to be detailed out in view of the local setting in accordance
with the prescribed zoning regulations.
14.5 Proposed Land use Classification
The land in the proposed Development Plan has been categorized into nine Land Use Zones:
Table 0-2: Proposed Land Use Classification, 2035
(ciii)
Sr.
No.
(civ)
Land use
Classification
(cv)
Land Use Sub-Classification
(cvi)
1
(cvii) Residential Use: R
(cviii) 1. Existing Residential: R1
(cix)
2. Proposed Residential: R2
(cx)
2
(cxi)
Commercial Use: C
(cxii) 1. Retail Shopping Zone and General
Business: C1
(cxiii) 2.Hospitality/ Hotels/ Lodges: C2
(cxiv) 3. Wholesale, Go-downs, Warehousing/
Regulated markets and Service Sector: C3
(cxv) 3
(cxvi) Mixed Use: M
(cxvii) -
(cxviii) 4
(cxix) Industrial Use: I
(cxx) -
(cxxi) 5
(cxxii) Public/Semi-Public
Use: PS
(cxxiii) 1. Govt./ Semi Govt. / Public Offices: PS
1
(cxxiv) 2. Educational and Institutional: PS 2
(cxxv) 3. Medical and Health Facilities and PS 3
(cxxvi) 4. Heritage and Socio-Cultural: PS 4
(cxxvii) 5.: Other Amenities/ Utilities and Services
PS 5
(cxxviii)
6 (cxxix) Recreational Use: R
(cxxx) 1. Playground/ Stadium / Sports Complex:
PS 1
(cxxxi) 2. Parks & Gardens: PS 2
(cxxxii) 3. Multi-Open Space (Maidan): PS 3
(cxxxiii)
7 (cxxxiv)
Transport Use: T
(cxxxv) 1. Road
(cxxxvi)
2. Railway
(cxxxvii)
3. Bus Deports/ Truck Terminals
(cxxxviii)
4. Parking-
8475
jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939
(cxxxix)
8 (cxl)
Primary Activity Use:
PA
(cxli) 1. Agriculture: PA 1
(cxlii) 2. Plantation: PA 2
(cxliii) 3. Forest: PA 3
(cxliv) 9
(cxlv) Protected
and
Undevelopable Use: E
(cxlvi) 1. Water bodies: E1
(cxlvii) 2. Protected Forest: E2
(cxlviii) 3. Green Belt/Buffer: E3
(cxlix) 4. Undevelopable use zone: E4
14.6 Proposed Land Use Plan
14.6.1 Residential Use
On the basis of residential density of 75 persons per hectare, an area of 135.90 hectares (15.14%)
has been proposed for the residential purpose. The residential areas are proposed to be developed in
and in the surroundings of the Nagar Panchayat Areas around the existing settlements. The
residential area accounts to 57.24% of the developable area. i.e., 237.43 hectares. The local
activities of cluster level enlisted in Chapter 8 such as nursery and primary schools, dispensaries,
parks, toilets etc. form an integral part of the residential areas and are to be detailed out during the
further course of preparation of Zonal, Sectoral Plans and Schemes.
14.6.2 Commercial Use
A total area of 8.70 hectares (0.97%) has been proposed for Commercial use. Most of the
commercial facilities have been proposed near the residential area in order to carter to the residing
population Other town level facilities viz., Wholesale and Warehousing activity (Mandi) and
Service Sector of 5.19 hectares has been proposed along the NH-3. Shopping centres are proposed
to be developed along with sizeable shops and requisite infrastructure, along the NH-3 in Tillu
Pratham village. Moreover, the Development Plan envisages to prepare improvement schemes for
the existing shopping centre to ensure improvement in environmental quality.
In order to carter to incoming tourist in the town, an area of 1.67 hectares (0.19%) has been
allocated. It includes the area require for boarding and lodging of future tourist traffic which may
come up within the Nadaun Planning Area along with other conforming land uses.
14.6.3 Mixed Land Use
As area of 2.41 hectares (0.27%) has been allocated for mixed use development at strategic
locations along the National Highway within the planning area.
14.6.4 Industry Use
As area of 10.27 hectares (1.14%) has been allocated for industrial development with the planning
area. It is proposed to accommodate agro based, horticulture and forest based industries apart from
handicraft and cottage industries in form of organized industrial area.
14.6.5 Public and Semi-Public Use
The Public and Semi-Public Use includes utilities, facilities, services, Government and Semi
Government offices and Institutions. The Utilities i.e. water supply, sewerage, drainage, electricity,
telephone establishments, garbage disposal etc. and Facilities like education, health, postal, police,
fire fighting, banking etc. besides Government and semi Government offices etc. have been given
due consideration for allocation of a land for this purpose in the Development plan. These
Institutions have extraneous influence zone beyond the immediate hinterland. These institutions are
proposed to be developed through their own mechanism by the respective authorities.
The existing land under public and semi-public facilities is 11.33 hectares and additional
requirement of 2.37 hectares is anticipated by providing utilities, facilities and services in. the
Planning Area by the year 2035. Accordingly, 13.70 hectares (1.53%) of land is proposed under
Public and Semi-Public use.
8476
jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939
14.6.6 Parks and Open Spaces Use
An area of 26.19 hectares (2.92%) has been proposed for organised parks and open spaces which
includes 10 hectares of Botanical and Zoological Park apart from organized green spaces such as
parks and playgrounds.
14.6.7 Traffic and Transportation Use:
As the town has grown around junctions of NH-3 and NH-303, there is a lot of regional traffic on
these narrow roads for which improvement in road network is proposed in the shape of bye-pass
road. Traffic and Transportation Use:
As the town has grown around junctions of NH-3 and NH-303, there is a lot of regional traffic on
these narrow roads for which improvement in road network is proposed in the shape of bye-pass
road.
The Development Plan envisages to provide parking lots on outskirts of the existing built up area to
meet with the requirements of increasing traffic volume on major entry points to already congested
town.
An area of 40.26 hectares (4.49%) has been proposed for Traffic and Transportation Use, out of
which 21.83 hectares is an existing area occupied by roads and parking spaces and 18.42 hectares is
additional requirement which includes 1.18 hectares of land for new bus terminal and truck
terminal. 1.00 hectares of land for taxi stand and parking and 16.28 hectares of area for proposed
by-passes and widening of existing roads.
14.6.8 Undevelopable Use
Undevelopable use zone shall be identified as all earthquake/landslide prone, cliffs and
environmentally hazardous area, areas adjacent to fault lines, areas with slope higher than 45
degree (NBC), flood plain and other areas identified by State Disaster Management Authority and
all the environmentally sensitive areas
Nadaun Planning Area has about 0.77 hectares of Undevelopable Area which accounts to 0.09% of
the total land.
8477
jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939
(cl)
(cli)
Figure 0-2: Proposed Land Use Plan
Table 0-3: Land use Distribution, 2035
Co
de
Land use Category
Nadaun
Planning Area
Developable
Area
Standar
ds
(by
URDPFI
)
Area
(in
Ha)
Percent
age of
Total
Land
Are
a
(in
Ha)
Percen
tage of
Total
Land
R
Residential
135.9
0
15.14%
135.
90
57.24
%
50-55%
R1
Existing Residential
83.29
9.28%
R2
Proposed Residential
52.60
5.86%
C
Commercial
8.70
0.97%
8.70
3.67%
2-3%
C1
Retail Shopping Zone and General
Business
1.84
0.21%
C2
Hospitality/ Hotels/ Lodges
1.67
0.19%
C3
Wholesale, Warehousing/ Regulated
markets and Service Sector
5.19
0.58%
8478
jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939
M
Mixed Land Use
2.41
0.27%
2.41
1.02%
I
Industry
10.27
1.14%
10.2
7
4.32%
3-4%
PS
Public and Semi Public
13.70
1.53%
13.7
0
5.77%
8-10%
PS
1
Govt./ Semi Govt. / Public Offices
4.45
0.50%
PS
2
Educational and Institutional
3.77
0.42%
PS
3
Medical and Health Facilities
0.99
0.11%
PS
4
Heritage and Socio-Cultural
0.88
0.10%
PS
5
Other Amenities/ Utilities and Services
3.62
0.40%
P
Recreational Green
26.19
2.92%
26.1
9
11.03
%
15-18%
P1
Playground/ Stadium/ Sports Complex
5.23
0.58%
P2
Parks & Gardens
19.40
2.16%
P3
Multi-open Spaces
1.56
0.17%
T
Transportation
40.26
4.49%
40.2
6
16.95
%
5-6%
T1
Road
37.81
4.24%
T2
Bus Depots/ Truck Terminals
1.18
0.13%
T3
Parking
0.06
0.01%
TS
Taxi Stand
0.94
0.10%
PA Primary Activity Use
431.4
9
48.08%
PA
1
Agriculture
408.9
7
45.57%
PA
2
Plantation
22.01
2.45%
PA
3
Forest
0.52
0.06%
E
Protected and Undevelopable Use
228.4
7
25.46%
E1
Water Bodies
105.5
1
11.66%
E2
Demarcated Protected Forest
109.3
8
12.19%
E3
Green Buffers
13.70
1.53%
E4
Undevelopable Area
0.77
0.09%
TOTAL
897.3
9
100.00
%
237.
43
100.00
%
Source: Estimated based on Proposed Land use
8479
jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939
15
Plan Implementation
15.1 Introduction
The Development Plan contains provision for a projected population of 17501 people which is
anticipated to reside in Nadaun Planning Area by the end of year 2035 through period of 20 years.
The total area covered within Nadaun Planning Area is 897.39 hectares. The 111.06 hectares of
land covered under DPF and 104.52 hectares under Water Bodies has been retained as such. An
acute shortage of funds for acquisition of land for public purposes is a great challenge to the
administration to ensure a sustainable integrated development pattern. Therefore it has been
proposed to adopt a people's participatory approach for an optimum accomplishment. It will only
be possible with the joint efforts of Nagar Panchayat and the Gram Panchayats included in the
Nadaun Planning Area and the Department of Town and Country Planning which is nodal agency
for planning in the State.
For the horizon year 2035, it is envisaged that about 101.18 ha of land is required for development
out of 897 ha of the Nadaun Planning Area. Though Phasing, costing and implementation of
Development Plan is to be contemplated by integrating it as part of Five Year Plans and keeping in
view development priorities to meet needs of growing population, yet in view of socio-economic
dynamics likely to persist after the course of five years on one hand and in consonance with the
national policy of preparation of rolling plans on the other. The programme for implementation of
each successive phase has to be worked out in view of reviewing at interval of 5 years’ time frame
i.e. after each phase. For implementation of Development Plan, necessary serviced land have to be
developed in view of planning provisions to the channelise growth of the town according to the
Development Plan. In implementation of this Development Plan, Nagar Panchayat Nadaun and
Gram Panchayats are proposed to play an instrumental role for bulk services, however, the State
Govt. has to make allocation either to the Department of Town and Country Planning or to
Infrastructural Departments.
15.2 Phasing
The Development Plan is a regulatory instrument to guide the development through horizon period
of 20 years. Since it is not possible to clearly foresee the entire scenario with reference to the
financial aspects that is likely to emerge over such a long period, therefore, the Development Plan
is considered to be a long-term policy document which is to serve as a guide for development and
must be reviewed after every five years to incorporate all the changes on priorities. The first phase
is very important as it gives lead to the development pattern that is to be followed in subsequent
phases.
To implement the proposals made in previous chapter in a phased manner, following phases have
been proposed: -
Phase I
2016-2021
Phase II
2021-2026
Phase III
2026-2031
Phase IV
2031-2035
8480
jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939
Details of activities to be undertaken in each phase is given in the table below:-
(clii)
Sr.
No.
(cliii) Activities/Use
(cliv) Pha
se I
(clv)
2016
-21
(clvi) Pha
se II
(clvii) 2021
-26
(clviii) Pha
se III
(clix) 2026
-31
(clx)
Pha
se IV
(clxi) 2031
-36
(clxii) 1
(clxiii) Commercial
(clxiv)
(clxv)
(clxvi)
(clxvii)
(clxviii) a (clxix) Re-vitalisation
of Pattan Bazaar
(clxx)
(clxxi)
(clxxii)
(clxxiii)
(clxxiv) b (clxxv) Wholesale
market/ware-
housing at Jalari
junction
(clxxvi)
(clxxvii)
(clxxviii)
(clxxix)
(clxxx) c (clxxxi) Revival
of
Sericulture Farms
(clxxxii)
(clxxxiii)
(clxxxiv)
(clxxxv)
(clxxxvi)
d (clxxxvii)
Hotels and
Restaurants
(clxxxviii)
(clxxxix)
(cxc)
(cxci)
(cxcii) e (cxciii) Service Sector -
Repair shops
(cxciv)
(cxcv)
(cxcvi)
(cxcvii)
(cxcviii)
2 (cxcix) Industrial
(cc)
(cci)
(ccii)
(cciii)
(cciv) a (ccv)
Handicraft
and
Cottage Industries
(ccvi)
(ccvii)
(ccviii)
(ccix)
(ccx)
b (ccxi) Agro-processing
Industries
(ccxii)
(ccxiii)
(ccxiv)
(ccxv)
(ccxvi) 3
(ccxvii) Traffic
and
Transportation
(ccxviii)
(ccxix)
(ccxx)
(ccxxi)
(ccxxii) a (ccxxiii)
24m
wide
Proposed new by-
pass
(ccxxiv)
(ccxxv)
(ccxxvi)
(ccxxvii)
(ccxxviii)
b (ccxxix)
15m
wide
NH-3 by pass via
Bharmoti Kalan
(ccxxx)
(ccxxxi)
(ccxxxii)
(ccxxxiii)
(ccxxxiv)
c (ccxxxv)
Widening
of existing NH to
15m
and
other
local roads
(ccxxxvi)
(ccxxxvii)
(ccxxxviii)
(ccxxxix)
(ccxl) d (ccxli) Junction
Improvements
(ccxlii)
(ccxliii)
(ccxliv)
(ccxlv)
(ccxlvi) e (ccxlvii)
Truck
Parking at Jalari
(ccxlviii)
(ccxlix)
(ccl)
(ccli)
(cclii) f (ccliii) Bus Terminal at
Nagarada
along
NH-3
(ccliv)
(cclv)
(cclvi)
(cclvii)
(cclviii) g (cclix) IPT System –
CNG Autos and
Electric
Rickshaws
(cclx)
(cclxi)
(cclxii)
(cclxiii)
(cclxiv) h (cclxv) Public Transport
System – Mudrika
Bus Sewa
(cclxvi)
(cclxvii)
(cclxviii)
(cclxix)
(cclxx) i (cclxxi) Relocation
of
Taxi stand
(cclxxii)
(cclxxiii)
(cclxxiv)
(cclxxv)
8481
jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939
(clii)
Sr.
No.
(cliii) Activities/Use
(cliv) Pha
se I
(clv)
2016
-21
(clvi) Pha
se II
(clvii) 2021
-26
(clviii) Pha
se III
(clix) 2026
-31
(clx)
Pha
se IV
(clxi) 2031
-36
(cclxxvi)
j (cclxxvii)
Parking lots
at
strategic
locations
(cclxxviii)
(cclxxix)
(cclxxx)
(cclxxxi)
(cclxxxii)
k (cclxxxiii)
Pedestrianis
ation
of
Pattan
Bazaar
(cclxxxiv)
(cclxxxv)
(cclxxxvi)
(cclxxxvii)
(cclxxxviii) l (cclxxxix)
Installation
of Flood light at
junctions
(ccxc)
(ccxci)
(ccxcii)
(ccxciii)
(ccxciv)
m (ccxcv) Installation
of
Traffic lights at
junctions
(ccxcvi)
(ccxcvii)
(ccxcviii)
(ccxcix)
(ccc)
n (ccci) Installation
of
Solar Street lights
(cccii)
(ccciii)
(ccciv)
(cccv)
(cccvi) 4
(cccvii) Tourism
(cccviii)
(cccix)
(cccx)
(cccxi)
(cccxii) a (cccxiii)
Developme
nt of Nadaun Fort
as
a
tourist
/
picnic spot
(cccxiv)
(cccxv)
(cccxvi)
(cccxvii)
(cccxviii)
b (cccxix)
Repair and
Restoration
of
Nadaun Fort
(cccxx)
(cccxxi)
(cccxxii)
(cccxxiii)
(cccxxiv)
c (cccxxv)
Light
and
sound
show
at
Nadaun Fort
(cccxxvi)
(cccxxvii)
(cccxxviii) (cccxxix)
(cccxxx)
d (cccxxxi)
Developme
nt
of
other
heritage sites
(cccxxxii)
(cccxxxiii)
(cccxxxiv)
(cccxxxv)
(cccxxxvi)
e (cccxxxvii) River
rafting
from
Dhera to Nadaun
(cccxxxviii) (cccxxxix)
(cccxl)
(cccxli)
(cccxlii)
f (cccxliii)
Camping
Sites
at
River
Beas
(cccxliv)
(cccxlv)
(cccxlvi)
(cccxlvii)
(cccxlviii)
5 (cccxlix)
Facilities
(cccl)
(cccli)
(ccclii)
(cccliii)
(cccliv) a (ccclv) Nursery
and
Primary Schools
(ccclvi)
(ccclvii)
(ccclviii)
(ccclix)
(ccclx) b (ccclxi) Establishment of
Kendriya
Vidyalaya
(ccclxii)
(ccclxiii)
(ccclxiv)
(ccclxv)
(ccclxvi)
c (ccclxvii)
Dispensary
(ccclxviii)
(ccclxix)
(ccclxx)
(ccclxxi)
(ccclxxii)
d (ccclxxiii)
Nursing
Home and Family
Welfare Centre
(ccclxxiv)
(ccclxxv)
(ccclxxvi)
(ccclxxvii)
(ccclxxviii) e (ccclxxix)
Post Office
(ccclxxx)
(ccclxxxi)
(ccclxxxii) (ccclxxxiii)
(ccclxxxiv) f (ccclxxxv)
Police Post
/ Station
(ccclxxxvi) (ccclxxxvii) (ccclxxxviii)
(ccclxxxix)
8482
jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939
(clii)
Sr.
No.
(cliii) Activities/Use
(cliv) Pha
se I
(clv)
2016
-21
(clvi) Pha
se II
(clvii) 2021
-26
(clviii) Pha
se III
(clix) 2026
-31
(clx)
Pha
se IV
(clxi) 2031
-36
(cccxc) g (cccxci) Fire Station
(cccxcii)
(cccxciii)
(cccxciv)
(cccxcv)
(cccxcvi)
h (cccxcvii)
Banquet
Hall
(cccxcviii)
(cccxcix)
(cd)
(cdi)
(cdii) i (cdiii) Mini-Secretariat
at Inderpal Chowk
(cdiv)
(cdv)
(cdvi)
(cdvii)
(cdviii) 6
(cdix) Utilities
(cdx)
(cdxi)
(cdxii)
(cdxiii)
(cdxiv) a (cdxv) Public Drinking
Water Coolers/ Water
ATM
(cdxvi)
(cdxvii)
(cdxviii)
(cdxix)
(cdxx) b (cdxxi) Public Toilets at
strategic locations
(cdxxii)
(cdxxiii)
(cdxxiv)
(cdxxv)
(cdxxvi)
c (cdxxvii)
Channelisat
ion of Man Khad and
Nallahs
(cdxxviii)
(cdxxix)
(cdxxx)
(cdxxxi)
(cdxxxii)
d (cdxxxiii)
Waste
to
Compost Plant
(cdxxxiv)
(cdxxxv)
(cdxxxvi)
(cdxxxvii)
(cdxxxviii) 7 (cdxxxix)
Recreation
al Spaces
(cdxl)
(cdxli)
(cdxlii)
(cdxliii)
(cdxliv) a (cdxlv) Cluster/
Neighbourhood Parks
(cdxlvi)
(cdxlvii)
(cdxlviii)
(cdxlix)
(cdl)
b (cdli) City
Park
at
SDM Office
(cdlii)
(cdliii)
(cdliv)
(cdlv)
(cdlvi) c (cdlvii) Development of
Kharidi Ground in to a
park
(cdlviii)
(cdlix)
(cdlx)
(cdlxi)
(cdlxii) d (cdlxiii) Development of
Ramlila Ground
(cdlxiv)
(cdlxv)
(cdlxvi)
(cdlxvii)
(cdlxviii)
e (cdlxix) Swimming Pools
(cdlxx)
(cdlxxi)
(cdlxxii)
(cdlxxiii)
(cdlxxiv)
f (cdlxxv)
Botanical
Garden
(cdlxxvi)
(cdlxxvii)
(cdlxxviii)
(cdlxxix)
(cdlxxx)
g (cdlxxxi)
Zoological
Garden
(cdlxxxii)
(cdlxxxiii)
(cdlxxxiv)
(cdlxxxv)
(cdlxxxvi)
7 (cdlxxxvii) Residential
(cdlxxxviii)
(cdlxxxix)
(cdxc)
(cdxci)
(cdxcii) a (cdxciii)
Residential
Sectoral Development
(cdxciv)
(cdxcv)
(cdxcvi)
(cdxcvii)
(cdxcviii)
8 (cdxcix)
Infrastruct
ure
(d)
(di)
(dii)
(diii)
(div)
a (dv)
Water supply
(dvi)
(dvii)
(dviii)
(dix)
(dx)
b (dxi)
Sewerage
(dxii)
(dxiii)
(dxiv)
(dxv)
(dxvi) c (dxvii) Strom
water
drains
(dxviii)
(dxix)
(dxx)
(dxxi)
(dxxii) d (dxxiii) Solid
Waste
Management
(dxxiv)
(dxxv)
(dxxvi)
(dxxvii)
(dxxviii)
e (dxxix) Power
(dxxx)
(dxxxi)
(dxxxii)
(dxxxiii)
(dxxxiv)
f (dxxxv) Telecommunicat
ion
(dxxxvi)
(dxxxvii)
(dxxxviii)
(dxxxix)
8483
jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939
15.3 Costing
The Plan envisages that the residential development is to be ensured by the land owners by sub-
divisions and Nagar Panchayat and Gram Panchayats through mechanism of 'Land Pooling and
Reconstitution'. In case the "Land Pooling and Reconstitution" mechanism does not succeed, then
land has to be acquired for implementation of the Development Plan Roads with width 6.00 metres
and less will be developed by Nagar Panchayats and Gram Panchayat by raising funds from the
beneficiaries. Roads with a width of 9.00 metres, 12.00 metres and 15.00 metres will be
implemented by the PWD by raising development charges through implementation and realization
of remunerative uses in the activity zones. However, the cost of arterial roads (18.00 metres)
including bye passes, bulk water and electric supply will be borne by obtaining funds through plan
allocation from the State Government and the same will be realized subsequently from the
beneficiaries.
The cost of various infrastructure projects envisaged in the Development Plan accounts of about
291 crores.
This includes:
Construction of new roads and road widening on proposed roads. Construction of storm-
water drains along the roads.
Construction of Water Treatment Plan and laying of water supply distribution network
Construction of Sewerage Treatment Plant and laying of sewer network
Augmentation of existing electric sub-station and laying of over-head electrical lines
Street-lighting and telecommunication networking
Solid waste management
The costing neither include land acquisition cost nor cost of construction of building. It is only cost
of infrastructural works which would have to be borne by the developing agency
Table 0-1: Summary of Infrastructure Cost
S.
No.
Description
Uni
t
Rate
Total
Quantity
Total
Amount
1
ROADS and PATHWAY
1A Asphalt Carriage Way
300mm GSB, 250mm WMM, 100mm DBM,
40mm BC
Sq.
m.
3,300
145142.62
47,89,70,6
46
SUB HEAD TOTAL
47,89,70,6
46
2
STORM WATER DRAINAGE
2A Rectangular Drains (RCC)
Met
er
21,000
60719.00
1,27,50,99,
000
2B Culverts (RCC) Big
Met
er
70,00,00
0
4.00
2,80,00,00
0
2C Culverts (RCC) Road Crossings
Eac
h
65,000
31.00
20,15,000
SUB HEAD TOTAL
1,30,51,14,
000
3
WATER SUPPLY
3A Potable Water Supply Distribution Network
HDPE PE80 <300mmdia, 300mm>DI Pipes,
Met
er
3,500
17926.04
6,27,41,14
0
8484
jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939
S.
No.
Description
Uni
t
Rate
Total
Quantity
Total
Amount
SandS K-7
3B WTP
ML
D
3,00,00,
000
1.20
3,60,00,00
0
SUB HEAD TOTAL
9,87,41,14
0
4
SEWERAGE
4A Waste Water network
RCC NP-3 internal lined pipes
Met
er
5,750
17926.04
10,30,74,7
30
4B STP
ML
D
3,50,00,
000
0.50
1,75,00,00
0
SUB HEAD TOTAL
12,05,74,7
30
5
Solid Waste Management
TP
D
3,00,000
1000.00
30,00,00,0
00
6
Power and Telecommunications
6A Augmentation of Gagaal Sub Station
33/11kV
L.S
3,50,00,
000
1.00
3,50,00,00
0
6B New 11kV OH Network
KM
6,02,557
24.05
1,44,91,50
7
6C L.V Network with Pole Mounted Distribution
Transformers
KM
9,18,298
37.05
3,40,22,95
1
6D Street lighting on the existing OH
Infrastructure
KM
5,00,000
32.05
1,60,25,00
0
6E Telecommunications / Data Network
Conduiting
KM
2,50,000
15.00
37,50,000
SUB HEAD TOTAL
10,32,89,4
58
TOTAL
2,40,66,89,
974
Add for Misc. and unforeseen items
5%
12,03,34,4
99
Escalation (per annum)
7%
17,68,91,7
13
TOTAL (cost as on 2016)
2,91,04,95,
102
Source: Estimation based on HP Schedule of Rates, PWD
The phase wise costing for the infrastructural work is presented in the table below. The detailed
costing for infrastructure works envisaged in Development Plan is presented in Annexure 4 based
on HP Schedule of Rates, PWD.
Table 0-2: Phase-wise costing
S.
N
o.
Description
PH-1: 2016-
2021
PH-2:
2021-2026
PH-3:
2026-2031
PH-4:
2031-2035
Total
Amou
nt
Qu
anti
ty
Amou
nt
Qua
ntit
y
Amo
unt
Qua
ntity
Amo
unt
Qua
ntit
y
Amo
unt
1
ROADS and
PATHWAY
8485
jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939
1
A
Asphalt Carriage Way
300mm GSB, 250mm
WMM, 100mm DBM,
40mm BC
761
55.
10
25,13,
11,83
0
206
94
6,82,
90,99
2
14
45
4
4,76,
99,42
1
338
39
11,16
,68,4
03
47,89,
70,64
6
SUB HEAD TOTAL
25,13,
11,83
0
6,82,
90,99
2
4,76,
99,42
1
11,16
,68,4
03
47,89,
70,64
6
2
STORM WATER
DRAINAGE
3
A
Rectangular Drains (RCC)
226
13.
00
47,48,
73,00
0
110
21.
00
23,14
,41,0
00
96
03.
00
20,16
,63,0
00
174
82.
00
36,71
,22,0
00
1,27,5
0,99,0
00
3
B
Culverts (RCC) Big
1.0
0
70,00,
000
1
70,00
,000
1
70,00
,000
1
70,00
,000
2,80,0
0,000
3
C
Culverts (RCC) Road
Crossings
11.
00
7,15,0
00
6.0
0
3,90,
000
5.0
0
3,25,
000
9.0
0
5,85,
000
20,15,
000
SUB HEAD TOTAL
48,25,
88,00
0
23,88
,31,0
00
20,89
,88,0
00
37,47
,07,0
00
1,30,5
1,14,0
00
4
WATER SUPPLY
4
A
Potable Water Supply
Distribution Network
HDPE PE80 <300mmdia,
300mm>DI Pipes, S&S
K-7
904
9.1
2
3,16,7
1,920
197
7.8
8
69,22
,580
20
64.
91
72,27
,185
483
4.1
3
1,69,
19,45
5
6,27,4
1,140
4
B
WTP
0.6
1,80,
00,00
0
0.6
1,80,
00,00
0
3,60,0
0,000
SUB HEAD TOTAL
3,16,7
1,920
2,49,
22,58
0
72,27
,185
3,49,
19,45
5
9,87,4
1,140
5
SEWERAGE
5
A
Waste Water network
RCC NP-3 internal lined
pipes
904
9.1
2
5,20,3
2,440
197
7.8
8
1,13,
72,81
0
20
64.
91
1,18,
73,23
3
483
4.1
3
2,77,
96,24
8
10,30,
74,73
0
5
B
STP
0.5
1,75,
00,00
0
1,75,0
0,000
SUB HEAD TOTAL
5,20,3
2,440
1,13,
72,81
0
1,18,
73,23
3
4,52,
96,24
8
12,05,
74,73
0
6
Solid Waste
Management
100
0.0
0
30,00,
00,00
0
30,00,
00,00
0
6
Power and
Telecommunications
6
A
Augmentation of Gagaal
Sub Station 33/11kV
1
3,50,
00,00
0
3,50,0
0,000
6
B
New 11kV OH Network
12.
025
72,45,
754
12.
02
72,45
,754
1,44,9
1,507
8486
jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939
5
6
C
L.V Network with Pole
mounted Distribution
Transformers
18.
52
5
1,70,
11,47
6
18.
525
1,70,
11,47
6
3,40,2
2,951
6
D
Street lighting on the
existing OH Infrastructure
32.
05
1,60,2
5,000
1,60,2
5,000
6
E
Telecommunications /
Data Network Conduiting
15
37,50
,000
37,50,
000
SUB HEAD TOTAL
2,32,7
0,754
3,50,
00,00
0
2,42,
57,22
9
2,07,
61,47
6
10,32,
89,45
8
TOTAL
1,14,0
8,74,9
44
37,84
,17,3
82
30,00
,45,0
68
58,73
,52,5
81
2,40,6
6,89,9
74
Add for Misc. and
unforeseen items
5,70,4
3,747
1,89,
20,86
9
1,50,
02,25
3
2,93,
67,62
9
12,03,
34,49
9
Escalation (per annum)
8,38,5
4,308
2,78,
13,67
8
2,20,
53,31
2
4,31,
70,41
5
17,68,
91,71
3
TOTAL (cost as on
2016)
1,32,8
3,14,5
06
49,51
,51,9
29
38,56
,15,0
91
70,14
,13,5
76
2,91,0
4,95,1
02
Source: Estimated based on HP Schedule of Rates, PWD
15.4 Financing
The cost of residential development including road network, sewerage, drainage, electrification,
parks, open spaces, parking, local convenient shopping etc., is to be borne by the land owners either
themselves in respect of their land holdings or by way of land pooling and reconstitution
mechanism in respect of small irregular holdings of different owners. The benefits likely to occur
by way of sale of plots by virtue of enhancement of land values due to planned efforts would be
more than sufficient to meet with the cost of development. On the basis of demarcation of plots in
view of duly approved sub-division land pooling and reconstitution scheme by the Director, Town
and Country Planning Department. Himachal Pradesh. The land owner may get advance from the
likely purchasers for development purposes.
The two-organized commercial complex on 2.00 hectares of land are to be developed by the Nagar
Panchayat/Cooperative Societies.
The Wholesale warehouse complex on 0.50 hectares is to be developed by the HP Marketing
Committee.
The Truck parking in vicinity of the proposed Mandi is to be developed by the Nagar
Panchayat/Gram Panchayat/PWD by raising funds from the beneficiaries in due course of time, by
charged parking.
The HP Department of Industries/HP State Industrial Development Corporation will be responsible
for development of industrial area.
8487
jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939
Similarly, the respective Departments/ Government undertaking by raising resources from the
beneficiaries will be responsible for development of utilities, facilities and services including water
supply, sewerage, drainage electrification, telephone etc. at the town level.
The Government and Semi-Govt. offices are to be developed by the respective Departments either
by raising their own resources or by obtaining funds from the Government.
Town and sector level parks may be developed by the Nagar Panchayat and Gram Panchayat by
arranging land for the purpose.
15.5 Implementation
Besides landowners, Nagar Panchayat, and Gram Panchayats shall be responsible for creation of
services land. However, overall control on implementation of proposals of Development Plan in
terms of land use, zoning and sub-division regulations shall vest with the Director, Town and
Country Planning Department, Himachal Pradesh. To assess achievements of each phase and to
orient the Development Plan according to changing needs as well as to cater for unforeseen factors,
it is envisaged to review this Plan after the completion of period of each phase.
In order to ensure inter-departmental coordination, a committee under the chairmanship of SDM,
Nadaun is hereby recommended. It shall have following members:
1. S.D.M, Nadaun, Chairman
2. Tehsildar, Nadaun
3. Executive Engineer (B&R), H.P.PWD, Nadaun
4. Executive Engineer (I&PH), Nadaun
5. Executive Engineer (HPSEB), Nadaun
6. DFO, Nadaun
7. Pradhan, Nagar Panchayat, Nadaun
8. Executive Officer, MC, Nadaun
9. Regional Manager, HRTC, Hamirpur
10. Pradhans, Gram Panchayats in Nadaun Planning Area
11. Executive Engineer (NH)
12. Three Key NGO’s or public representatives
13. Town and Country Planner, Hamirpur Member Secretary
The Committee may meet at least twice in a year and devise ways and means to ensure
implementation of development plan proposals.
16
General Development Regulation, Building By-Laws and Procedure of Plan Sanction
16.1 Objective of Development Regulation and Building By-Laws
Regulations/Building Bye Laws are legal tools for development control used to regulate ground
coverage, height, architectural design and construction aspects of buildings to achieve orderly
development of an area. They are statutory in nature and serve to protect buildings against fire,
earth quake, noise, structural failures and other hazards. They also safeguard appropriate indoor
environment for inhabitants with natural light & ventilation. Regulations/Building Bye Laws also
helps to avoid encroachments and protect the road right of way.
8488
jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939
All mandatory regulations w.r.t. Development Plan/ Development Control Regulations regarding
use, coverage, FAR, set-backs, open spaces, height, number of stories, number of dwelling units,
parking standards etc., for various categories of buildings, including modifications therein, made
from time to time, shall be applicable mutatis-mutandis in the Building Regulations as well. All
amendments/ modifications made in these Regulations will automatically be included as part of the
Development Control Regulations.
16.2 Jurisdiction of Regulations
These Regulations shall apply to the sub-division of land and building activities in the Nadaun
Planning Area. The detail of Revenue Villages falling in Nadaun Planning Area is as under:
16.3 Applicability of Regulations
Except hereinafter or otherwise provided, these Regulations shall apply to:-
i.
all new development and re-development of a plot,
ii.
sub-division of land,
iii.
erection and/or re-erection of a building
iv.
and all building activities.
These Regulations shall be read in conjunction with the Himachal Pradesh Town and Country
Planning Act, 1977 and the Himachal Pradesh Town and Country Planning Rules, 2014 as
amended from time to time and shall be applicable for a period for which this Development Plan
has been prepared, after which these shall be reviewed. Till such time the reviewed Regulations are
notified, these will continue to be in force.
16.3.1 New Development and Re-development
Redevelopment is replacement of the existing built-up environment and enable co-creation of a
new layout with enhanced infrastructure and increased density. These Regulations applies to the
design, construction or re-construction and additions and alterations of new & existing buildings
within the plot.
Sr.
No.
Name of the Revenue Village
Hadbast
No.
Area (in
Hectares)
Population
2011
1.
Nagarada (Nagar Panchayat)
18/20
72.84
4430
2.
Kot (Nagar Panchayat)
18/21
74.00
3.
Dolee Gharan (Nagar Panchayat)
18/22
23.15
4.
Seri (Nagar Panchayat)
19
61.48
5.
DPF Kuthar
18
31.14
-
6.
Kuthar
18/24
45.83
356
7.
Bharmoti Kalan
18/25
98.65
526
8.
Jalari Saunkhlan
19/32
28.40
494
9.
Harmandir Mandiala
19/35
57.60
458
10
Harmandir Rukwalan (Partially)
19/37
5.06
20
11
Bela
19/38
193.94
2347
12
DPF Tillu
19/39
87.10
46
13
Tillu Pratham
19/39
13.32
335
14
Tillu Khas
19/39
72.96
649
15
Gagaal
19/40
31.92
251
Total
897.39
9912
Table 0-1: Components of Nadaun Planning Area
8489
jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939
16.3.2 Part Construction
In case of part construction, where the whole or part of a building is demolished or altered or re-
constructed, except where otherwise specifically stipulated, these Regulations shall apply only to
the extent of the work involved.
16.3.3 Re-construction
The re-construction in whole or part of a building which has ceased to operate due to fire, natural
collapse or demolition having been declared unsafe, or which is likely to be demolished, as the case
may be, these Regulations shall apply.
16.3.4 Existing approved buildings
Nothing in these Regulations shall require the removal, alteration or abandonment, nor prevent
continuance of the lawfully established use or occupancy of an existing approved building unless,
in the opinion of the Competent Authority, such a building is unsafe or constitutes a hazard to the
safety of adjacent property or to the occupants of the building itself.
16.4 Development Permission
Development or re-development shall carry out including sub-division on any plot or land (not
forming part of any approved layout plan or scheme) after obtaining approval for the layout plan
from the Competent Authority only.
15.5 Building Permission
16.5.1 Building Permission
Any person intending to erect, re-erect or make addition/ alterations in any building or cause the
same to be done shall first obtain appropriate building permission for each such building from the
Competent Authority.
The following item of works are exempted from the above Regulation:
(i) Plastering/cladding and patch repairs, except for the Heritage Buildings where
Heritage Conservation Committee’s permission is required.
(ii) Re-roofing or renewal of roof including roof of intermediate floor at the same height.
(iii) Flooring and re- flooring.
(iv) Opening windows, ventilators and doors opening within the owners plot.
(v) Rehabilitation/repair of fallen bricks, stones, pillars, beams etc.
(vi) Construction or re- construction of sunshade not more than 0.75 Metre in width within
one’s own land and not overhanging over a public street.
(vii) Construction or re-construction of parapet and also construction or reconstruction of
boundary walls as permissible under Bye Laws.
(viii)White washing, painting etc. including erection of false ceiling in any floor at the
permissible clear height provided the false ceiling in no way can be put to use as a loft
/mezzanine floor etc.
8490
jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939
(ix) Reconstruction of portions of buildings damaged by storm, rains, fire, earthquake or
any other natural calamity to the same extent as existed prior to the damage as per
sanctioned plan, provided the use conforms to provisions of Development Plan.
(x) Erection or re-erection of internal partitions provided the same are within the preview
of the Bye-laws.
(xi) For erection of Lifts in existing buildings unless it does not affect the free movement.
(xii) Change/ Installation/ re-arranging/ relocating of fixtures or equipments without
hindering other’s property/ public property shall be permitted.
(xiii)Landscaping
(xiv) Toilet/Washroom, Security Room, up to a maximum area of 9.00 M2 only (permitted
within setback area, provided it does not obstruct fire vehicles movement) in plot more
than 3000 M2.
(xv) A Porta cabin up to 4.50 M2 permitted within setback area, provided it does not
obstruct fire vehicles movement.
16.5.2 Grant, Refusal and Deemed to be Sanctioned
If within the time limit stipulated in the Himachal Pradesh Town and Country Planning Act, 1977
as amended from time to time for various categories of buildings specified therein or the
Competent Authority fails to intimate in writing to the person, who has applied for permission of its
refusal or sanction or any intimation, the application with its plans and statements shall be deemed
to have been sanctioned;
Provided that the fact is immediately brought to the notice of the Competent Authority in writing
by the person; and
Subject to the conditions mentioned in these Bye-laws, nothing shall be constructed to authorize
any person to do anything in contravention or against the terms of lease or titles of the land or
against any other Regulations, Bye-laws or Ordinance operating on the site of the work.
In case the Competent Authority rejects the application due to any reasons, the applicant can re-
submit the building plan along with fees and with compliances.
16.6 Already permitted buildings
Building permission issued by the Competent Authority before these Regulations come in to effect
and where construction is in progress and has not been completed within the specified period from
the date of such permission, the said permission shall be deemed to be valid and shall only be
eligible for re-validation thereunder. Accordingly, where the validity of permission has expired,
such construction shall be governed by the provisions of these Regulations. If the validity of
permission has not expired and construction has not being started such applicants may revise the
layout plan as per these regulations.
8491
jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939
16.7 Procedure for obtaining Planning/Building Permission
16.7.1 Application
The application for development of land to be undertaken on behalf of the Union or State
Government under Section 28 and under Section 29 by a Local Authority or any Authority
specially constituted under the Himachal Pradesh Town and Country Planning Act, 1977 as
amended from time to time shall be accompanied by such documents as prescribed under Rule- 14
of the Himachal Pradesh Town and Country Planning Rules, 2014. The application for
development of land to be undertaken under Section 30 by any person not being the Union or State
Government, Local Authority or any Authority specially constituted under the Himachal Pradesh
Town and Country Planning Act, 1977 as amended from time to time shall be in such Form along
with the Specifications Sheet and Schedule attached with these Forms and containing such
documents and with such fee as prescribed under Rule 16 of the Himachal Pradesh Town and
Country Planning Rules, 2014.
All the applications shall be made online. The procedure documents to be submitted online shall be
as prescribed in the Himachal Pradesh Town and Country Planning web portal i.e.,
http://tcp.hp.gov.in
16.7.2 Documents Required
Apart from above, the applicant shall furnish the following additional documents namely:
16.7.2.1 Administrative Documents:
1.
A copy of Ownership documents, i.e. latest original Jamabandi.
2.
Latest original Tatima showing Khasra number of land in question, adjoining Khasra
numbers from all sides of plot and width of the approach path/road. The land applied
for shall be shown in red, in the Tatima.
3.
Copy of Treasury Challan Form vide which requisite fee has been deposited.
4.
To avail any compensatory benefits due to land acquisition for any public
infrastructure a certificate from the Nagar Panchayat or Gram Panchayat or Competent
Authority as the case may be, shall be enclosed in support of claim for compensatory
benefits.
16.7.2.2 Technical Documents:
1.
Location Plan in the Scale of 1:1000, with North direction indicating the land in question,
main approach roads, important physical features of the locality/area, important public
buildings like School, Hospital, Cinema, Petrol Pump etc. and surrounding ownership.
2.
Site Plan in the scale of 1:200 with North direction indicating the proposed site, approach
road, adjoining buildings, the existing and proposed utility infrastructure such as drainage
and sewerage, water supply and power including the built-up area and open area clearly.
Site must tally with the shape and dimensions of plot shown in the Tatima.
3.
Building Plan showing floor plans, elevations and sections in the scale of 1: 100. The
architectural drawings duly signed by the private professionals registered under Appendix-
10 of Himachal Pradesh Town and Country Planning Rules 2014 as amended from time to
time.
8492
jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939
4.
Recommended notation for colouring of plans: The site and building plans shall be coloured
as specified in the table given below. Where items of work are not identified, the colouring
notation used shall be indexed
Table 0-2: Colouring of Plans
Sr.
No.
Item
Site/ Building Plan
1.
Plot lines
Yellow
2.
Road/ Street/ Path
Black
3.
Proposed building line
Red
4.
Existing work (Outline)
Green
5.
Work proposed to be demolished
Orange
6.
Sewerage
Dark Brown
7.
Water Supply/ RWH System
Sky Blue
8.
Drainage
Dark Blue
5.
In the Site Plan, the horizontal distance of electricity line, from development as per Indian
Electricity Rules, in case any electricity line is passing over or nearby the proposed site
shall be shown.
6.
A certificate from the Nagar Panchayat or Gram Panchayat or Competent Authority, as the
case may be, shall be enclosed to claim compensatory benefit in support of taking over the
land surrendered for development of road/ path/ public facility or amenities/ infrastructure.
The land surrendered for development of Public Street/ Facility/ Infrastructure shall be
registered by the Revenue Authority as Public Purpose. Provided that the applicant shall be
compensated by allowing the Floor Area Ratio (FAR) on the surrendered land for public
purpose.
Note- Total plot area shall also include the area surrendered for public purpose so that applicant
shall not lose the FAR for any land surrendered in public interest by utilising that FAR on
the remaining land.
7.
The structural stability certificate and soil investigation report shall be submitted by the
applicant on submission of planning permission case and at the time of completion of
structure and before occupancy duly singed by the registered Structural Engineer as per
Form -15 of the Himachal Pradesh Town and Country Planning Rules 2014 as amended
from time to time.
8.
The applicants shall not be insisted for submission of No Objection Certificate (NOC) from
National Highway Authority of India (NHAI) or Himachal Pradesh Public Works
Department (HPPWD) authorities. However, the Competent Authority shall ensure and
coordinate with other related Authorities that building is sanctioned strictly as per the
Regulations and facilitate single window clearance to the applicant. Applicant will submit
his layout plan with clearly demarcated, acquired and controlled width etc.
16.8 General Regulations
The following General Regulations shall apply to all development activities in the Nadaun Planning
Area: -
8493
jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939
1.
Maximum cutting of the natural ground profile shall not exceed more 3.50 Metre. However,
in extra ordinary cases where hill cut or excavation is more than 3.50 meter site
development Plan showing retaining/ breast wall etc. would be prepared/ designed by the
Structural Engineer.
2.
Maximum acceptable slope for development shall be 45 degrees.
3.
Construction should be allowed on sandwiched plots without any kind of setbacks but
projection shall not be allowed over the streets/roads.
4.
Sky view impression on the ground should be such that nothing including projections and
appendages such as AC outdoor units/sign bards etc. should project on the streets/ roads/
others' land.
5.
Water, sludge and sewage should also not trickle on the streets or roads. Septic Tank and
provision to lay out sewerage service line or connecting with the existing sewerage lines
shall be mandatory.
6.
The height of the room for human habitation shall not be less than 2.75 Metres measured
from the surface of the floor to the soffit of the slab, provided that the minimum headway
under any beam shall not be less than 2.40 Metres.
7.
No boundary wall, fence and hedge along any yard or plot shall exceed 1.50 Metre in
height.
8.
On a corner plot bounded by a vehicular road in any land use zone or area, nothing shall be
erected, placed, planted or allowed to grow in such a manner so as to materially impede
vision to avoid accidents and smooth running of vehicular traffic.
9.
No construction shall be allowed within 5.00 Metre distance from the existing forest or
green belt boundary.
10.
Minimum building width of 5.0 Metre be ensured after leaving setbacks. There will be No
side setbacks in case of row housing.
11.
There would be mixed land use in the entire Planning Area as per para 16.16 Zoning
regulations. Hence, the change of Land use shall not be attracted if the proposed
construction is a permitted activity in a particular land use zone..
16.8.1 Setbacks
1.
Construction other than as is permissible under the Himachal Pradesh Roadside Control
Act, 1972 as amended from time to time would not be allowed on the controlled width of
National Highway Authority of India (NHAI) or Himachal Pradesh Public Works
Department (HPPWD).
2.
A Front set back of minimum 3.00 Meter shall be maintained from the controlled width.
The controlled width can be allowed for parking purpose which has to be open to sky or
temporary coverings.
3.
The setbacks shall not be applicable to services like, all road side infrastructure/ facilities
such as rain shelters, toilets, landscaping etc. Such temporary structures which are
8494
jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939
specifically permitted by the Himachal Pradesh Public Works Department on the acquired
width of a road should not touch the abutting properties.
4.
In case of irregular plots or in case of site constraints, uniformity of setbacks shall not be
insisted. In such case, the Competent Authority would consider the maximum ground
coverage or minimum open area while approving such cases.
5.
In open area of setback (other than controlled width) small temple, parking, porch, garage,
swimming pool, septic tank, other services and steps up to plinth level would be
permissible.
16.8.2 Building Height
16.8.2.1 Building Height
The building height shall be the vertical distance measured:-
i.
In the case of flat roofs from the plinth level to the highest point of the building.
ii.
In case of pitched roofs from the plinth level to the highest point up to the point where
the external surface of the outer wall intersects the finished surface of the sloping roof.
iii.
In the case of gables facing the road midpoint between the eaves level and the ridge.
Where plinth level is the finished floor level of the floor just above the existing natural
ground level.
16.8.2.2 Height Exemptions
The following structures shall not be considered in regulating the height of the building: -
1.
Roof tanks and their supports not exceeding 2.00 Meter in height.
2.
Mechanical, electrical, HVAC, lift rooms and similar service equipment.
3.
Staircase mumty not exceeding 3.00 Meter in height.
4.
Architectural features serving no other function except that of decoration, chimneys, poles,
parapet and other projections not used for human habitation, may extend beyond the
prescribed height limits, not exceeding 1.50 Metre in height, unless the aggregate area of
such structures exceeds 1/3rd of the roof area of the building on which these are erected.
5.
Solar panels installed on the roof.
6.
These height regulations shall not apply to the structures housing main seat of Deity
/Sanctum / Sanctorum which are part of religious buildings e.g. Temples, Mosques,
Gurudwaras, Churches, etc. provided it is so designed and approved by the Competent
Authority. The height restrictions shall apply to the ancillary structures like dharamshala,
sarai etc.
16.8.3 Ground Coverage and Floor Area Ratio
16.8.3.1 Definition and Illustration
The Floor Area Ratio (FAR) means the quotient obtained by dividing the total covered area (plinth
area) on all floors multiplied by 100 by the area of the plot.
8495
jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939
FAR
= Total covered area of all floors x 100
Plot Area
Illustration
10.00 M
15.00 M
Total Plot Area
= 15.00 M X 10.00 M
= 150.00 M2
Setbacks
Front
= 2.00 M,
Left Side = 1.50 M
Right Side
= 1.50 M
Rear
= 1.50 M
Built Up Area
= 11.50 M X 7.00 M
(after leaving Setbacks)
= 80.50 M2
Covered Area on one floor
= 80.50 M2
Open Area
= 150.00 M2 - 80.50 M2
= 69.50 M2
Floor Area Ratio (FAR)
= 1.75
Total Built up Area
= 150.00 M2 X 1.75
(as per FAR)
= 262.50 M2
Therefore, Number of storeys
= 262.50 M2
80.50 M2
= 3.26
Number of storeys
= 3 storeys (say)
16.8.3.2 FAR exemptions
The following shall not be included in covered area for FAR and Ground Coverage calculations:
1.
Machine room for lift on top floor as required for the lift machine installation.
2.
Rockery, lift/ lift well, escalator/ travellator well and well structures, plant nursery, water
pool, swimming pool at any level (if uncovered), platform around a tree, water tank,
8496
jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939
fountain, bench, chabutara with open top and / or without enclosures, open ramps,
compound wall, gate, slide swing door, fire staircase (without enclosure), fire towers, refuse
area, fire control room, overhead water tank or top of building/ open shafts, cooling towers.
3.
Mumty over staircase on top floor maximum 3.00 M height.
4.
Watch and ward cabins of total area not more than 4.50 M2 and 6.00 M2 with W/C each at
entry and exit only, within the property line.
5.
Pergolas, sunshade elements and balconies with maximum 2 side enclosed.
6.
Plinth steps.
7.
Meter Room with HT/ LT panel, DG Room, AC Plant room, CC TV room/ Control room,
Fire Control room and similar services area permitted in the setback and shall not be
counted in FAR. Similarly Service area on habitable floors- like HVAC (Heating,
Ventilation and Air Conditioning), MEP installations, Janitor Rooms, AHU Room, Electric
room, LT Room, CCTV room, laundry or any other similar services and Building service
shafts like electrical shafts, communication shafts, fire shafts MEP and HVAC shall not be
from FAR.
8.
Entrance porch, veranda, canopies, covered Parking Area shall not be counted in FAR but
shall account for ground coverage.
9.
Basement and any floor if used for parking, household storage and services. Basement area
shall not extend beyond the ground coverage.
16.8.4 Basement or Cellar
Any storey of the building completely or partly below the natural ground level shall be considered
as basement or cellar.
Construction of basement/ cellar shall not be counted as a storey and should be constructed within
the prescribed setbacks and prescribed building lines and subject to maximum coverage on floor i.e.
entrance floor and may be put for following uses:-
i.
storage of household or other goods of ordinarily combustible material.
ii.
strong rooms, bank cellars etc.;
iii.
air conditioning equipment and other machines used for services and utilities of the
building and
iv.
parking spaces.
The basement/ cellar shall have following requirements:-
i.
All the walls shall be kept solid and without any openings; and below the natural
ground level except the portion kept for ventilation purpose;
ii.
Every basement/ cellar shall be, in every part, at least 2.40 M in height from the floor
to the underside of the roof slab or ceiling.
iii.
Adequate ventilation shall be provided for the basement/cellar and any deficiency in
ventilation requirements may be met by providing mechanical ventilation in the form
of blowers, exhaust fans and air conditioning system etc.;
8497
jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939
iv.
The minimum clear height of the ceiling of any basement/cellar shall be 0.90 M and
the maximum 1.20 M above the average surrounding ground level;
v.
Adequate arrangements shall be made such that surface drainage does not enter the
basement/cellar;
vi.
The walls and floors of the basement/cellar shall be watertight and be so designed that
the effects of the surrounding soil and moisture if any, are taken into account in design
and adequate damp proofing treatment is given;
vii.
The access to the basement/cellar shall be separate from the main and alternative
staircase providing access and exit from higher floor. Where the staircase is continuous
in the case of buildings served by more than one staircase, the same shall be enclosed
type, serving as a fire separation from the basement/cellar floor and higher floors.
Open ramps shall be permitted, if they are constructed within the building line subject
to the provision clause (v) above;
16.8.5 Regulations for Services
1.
Septic Tank or connections with sewerage lines, where available shall be mandatory.
2.
All Commercial/ Public and Semi -Public buildings above 15.00 Metres height shall have
the provisions for elevators.
3.
Firefighting provisions and specification shall be as per National Building code of India,
2016.
4.
Risks and respective mitigations shall be planned by the competent authorities such as state
Fire department and police to manage events and respond to natural disasters.
5.
Distance from Electric lines- The distance in accordance with the Central Electricity
Authority (Measures Relating to Safety and Electric Supply) Regulations, 2010 as amended
from time to time and as defined in National Building Code of India, 2016 is to be provided
between the building and overhead electric supply line as under:-
Table 0-3: Clearances from Electric Supply Lines
Source: NBC, 2016
Sr.
No.
Type of Supply Line
Vertical Clearance
Horizontal
Clearance
1.
Voltage
lines
and
service
lines
not
exceeding 650V
2.50 Metre
1.20 Metre
2.
High
voltage
lines
above 650 Volts and
including 11,000 Volts
3.70 Metre up to and
including 33kV
1.20 Metre
3.
High
voltage
lines
above
11,000 Volts and up to
and
including 33,000 Volts
3.70 Metre
2.00 Metre
4.
Extra
high
voltage
lines
additional
33,000
Volts
3.70 Metre plus 0.30
Metre
for
every
additional
33,000
Volts or part thereof
2.00 Metre plus 0.30
Metre
for
every
additional 33,000
Volts or part thereof
8498
jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939
16.9 Development Control Regulations
16.9.1 Residential Buildings
The applicant must make sure the layout plan of residential building complies with following
basic requirements:
i.
That there should be sufficient natural light and fresh air/ ventilation in the
habitable area within the building, when constructed.
ii.
That there is protection against fire, noise, dust and pollution hazards.
iii.
That circulation and access is easy and safe from any accident point of view.
iv.
The minimum plot area, minimum setbacks and maximum FAR shall be as
under:
Table 0-4: Residential Building Regulations shall be applicable in Nadaun Planning Area
Sl.
No.
Description and
Minimum Plot
Area
Minimum Set Backs
(in Meters)
Ground
Coverage
Maximum
Floor
Area
Ratio
Maximum Height in Meters
Max
DUs/
Plot
Front Side Rear
I
Row Houses with common
1
30 m2 up to 60
m2
0.90
Nil
0.90
75%
1.80
6.00
2
2
Above 60 m2 up
to 120 m2
2.00
Nil
1.00
75%
1.80
9.00
3
II
Semi-detached Houses with common wall on one side
1
2
Above 120 up to
250 m2
2.00
1.50
1.50
50%
1.50
12.00
3
III
Detached Houses
1
Above 150 m2 up
to 250 m2
2.00
1.50
1.50
50%
1.75
21.00
4
2
Above 250 m2 up
to 500 m2
3.00
1.75
1.75
45%
1.75
21.00
4
3
Above 500 m2
5.00
3.00
3.00
40%
1.75
21.00
4
Note:
1.
*: In case of the smallest category of row housing i.e. 30 sq.m. – 60 sq.m, max 60% of each
of the front and rear setback area shall be allowed for Ground Coverage. Max. 0.45M
window projection shall be allowed in the setback area.
2.
The entrance to the house shall be from the front setback area and none of the projections
shall infringe on to the road ROW.
3.
Sample Layout Plan for 30 sq.m. Row Housing building is given in Annexure 5.
4.
The three storyed building shall be permitted in the Planning Area irrespective of FAR.
16.9.2 Non-Residential Buildings
16.9.2.1 Commercial Buildings:
1.
Commercial Corridor
There is commercial corridor on Nadaun-Jwalamukhi Road, Nadaun-Hamirpur Road and Nadaun
Hoshiarpur Road in the Nadaun Planning Area. All developmental activities should strictly
conform to the Regulations without any kind of relaxation in front open area. However, Norms of
side setbacks can be relaxed, on the merit of case.
8499
jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939
2.
Market Area
There is dense market area. The already built up area in Nadaun market can be considered for in
situ re-development. There won’t be any consideration for setbacks in market, but height would be
restricted to 12.00 Metres only.
3.
Hotel Units, Lodges, Hostels, Guest Houses
i.
Minimum Plot Area
500 M2
ii.
Maximum Ground Coverage
50%
iii.
Floor Area Ratio (FAR)
2.00
iv.
Maximum Height
21.00 Metres*
* Subject to seismic and structural stability
Note: 10% of the FAR can be used as commercial space/ convenient shopping.
4.
Marriage Palaces
i.
Minimum Area
2000 M2
ii.
Maximum Ground Coverage
30%
iii.
Floor Area Ratio (FAR)
1.00
iv.
Maximum Height
15.00 Metres
5.
Community Centre
i.
Minimum Area
1000 M2
ii.
Maximum Ground Coverage
50%
iii.
Floor Area Ratio (FAR)
1.50
iv.
Maximum Height
15.00 Metres
6.
Petrol Pump
i.
Plot Size
1000 M2
ii.
Front of the plot shall not be less than
30.00 Metres
Note: Petrol Pump shall not be allowed within the Nagar Panchayat boundary.
7.
Shops
(a) Independent shop/ show rooms (standalone) above 10M2 to 30 M2
i. Maximum Height
6.00 Metres
(b) Row shops with common wall on two sides above 30M2to 100 M2
i. Floor Area Ratio (FAR)
1.75
ii. Maximum Height
9.00 Metres
(c) Row shops with common wall on two sides above 100M2to 250 M2
i. Floor Area Ratio (FAR)
1.75
ii. Maximum Height
18.00 Metres
(d) Above 100M2to 250 M2
i. Floor Area Ratio (FAR)
1.75
ii. Maximum Height
18.00 Metres
8.
Shopping Complex
(a) 500 M2 to 1500 M2
i. Floor Area Ratio (FAR)
1.75
ii. Maximum Height
18.00 Metres
8500
jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939
(b) Above 1500 M2 to 4000 M2
i. Floor Area Ratio (FAR)
1.75
ii. Maximum Height
18.00 Metres
(c) Above 4000 M2
i. Floor Area Ratio (FAR)
1.50
ii. Maximum Height
18.00 Metres
16.9.2.2 Public-Semi Public Buildings
i. Minimum Plot Size
500 M2
ii. Maximum Ground Coverage
40%
iii. FAR
2.00
iv. Maximum Height
30 Metres*
* Subject to seismic and structural stability
9.
Educational Facilities
(a)
Nursery School
i. Maximum ground coverage
33.33%
ii. Maximum FAR
1.00
iii. Maximum Height
9 Metres
(b) Primary School
i. Maximum ground coverage
40%
ii. Maximum FAR
1.20
iii. Maximum height
15 Metres
(c) Higher Secondary School
i. Maximum ground coverage
35%
ii. Maximum FAR
2.00
iii. Maximum height
15 Metres
(d) College
i. Maximum ground coverage
35%
Note:
1. In case of the above premises the total area of the plot shall be divided in-
(i) School/college building area
(ii) Play field area
(iii) Parking area
(iv) Residential and hostel area
2. The maximum ground coverage and FAR shall be calculated only on the areas meant for
building.
16.9.3 Industrial Use:
The Regulations for Industrial use/activities shall be as per Regulations contained in Appendix-2 of
the Himachal Pradesh Town and Country Planning Rules, 2014.
For Industrial use/activities, following Regulations shall be applicable:-
8501
jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939
i.
Minimum area of plot:
For small scale industry shall be 250 M2 to 500 M2.
(b) For services/light scale industry shall be 501 M2 to 1000 M2.
(c) For medium scale industry shall be 1001 M2 to 5000 M2.
(d) For large and heavy scale industry shall be above 5000 M2.
(e) The plot area as mentioned in clauses (a) to (d) above would not be applicable in the cases
where the sub-division of land has taken effect before the commencement of the Himachal Pradesh
Town and Country Planning Rules, 2014.
The plot area as mentioned under clauses (a) to (d) above would not be applicable for the individual
plots, if any, created/allotted by the Himachal Pradesh Industries Department and Himachal
Pradesh State Industrial Development Corporation (HPSIDC) or any other Authority prior to
coming into force of the Himachal Pradesh Town and Country Planning Rules, 2014.
The layout and design of industrial area, if any, shall be as per requirement of the Industry and shall
be got approved from the Director.
ii.
Height of floor/storey:
The minimum floor/ storey height of industrial building shall be 3.00 Metres and sloping roof
height shall be in accordance with volume of the structure. In case of roof trusses, height of
building should be adjusted /relaxed accordingly.
The plot area, minimum set-backs, maximum Floor Area Ratio (FAR) and maximum height of
building shall be governed by following Table:
Table 0-5: For Industrial Uses
Sr.
No
.
Type of
Industry
Plot area
in M2
Minimum Set Back in
Metres
Max.
FAR
Max. Height in Metres
from Mean Sea Level
up to
1000 M
Fron
t
Left
Righ
t
Rea
r
1.
Small
Scale
Industries
250
to
500
3.00
2.00
2.00
2.00
1.75
15.00
2.
Services/
Light
scale
Industries
501
to
1000
5.00
2.00
2.00
3.00
1.50
15.00
3.
Medium
Scale
Industries
1001 to
5000
10.0
0
5.00
5.00
5.00
1.25
20.00
4.
Large
and
Heavy Scale
Industries
Above
5000
15.0
0
7.50
7.50
7.50
1.00
20.00
Note:-
(i) Minimum width of path/road abutting one side of plot shall be 5.00 M.
(ii) Service area required for pharmaceutical units or such type of Industries under requirement of
Goods Manufacturing Practice (G.M.P) shall not be included for calculation of FAR, provided it is
only used for utilities and services but not in any case for production.
(iii) For ancillary uses like security post/room shall be allowed in set-back area i.e. one wall shared
with the boundary wall and shall be counted in the Floor Area Ratio (FAR).
8502
jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939
16.9.4 Other Regulations
16.9.4.1 Other General Regulations
Regulations for Solar Passive Building Design, for Development of Barrier Free Environment for
the Persons with Disabilities in Public and Semi Public Building & Re-creational Areas within the
limits of Economic Capacity, for Rain Water Harvesting, for Development of Apartments and
Colonies in Real Estate Projects and for Installation for Communication Towers shall be as
prescribed in the Himachal Pradesh Town and Country Planning Rules, 2014.
16.9.4.2 Regulation for development of Information Technology Park (IT/Bio-Park)
The development of Information Technology Park shall be regulated as per Regulations contained
in Appendix-3 of the Himachal Pradesh Town and Country Planning Rules, 2014.
16.9.4.3 Regulations Fire and Life Safety
The provisions of fire and life safety as enshrined in the National Building Code of India, 2016
shall be applicable to buildings having height of 15.00 Meter or above and having floor area more
than 500 M2 on any one or more floors and in case of Institutional Buildings it shall be applicable
to the buildings having height of 9.00 Meter and above.
16.9.5 Relaxations
In the public interest and in the interest of town design or any other material consideration the
Competent Authority may relax minimum size of plot, setbacks and Floor Area Ratio (FAR). The
decision of the Competent Authority shall be final.
16.10 Special Area Regulations
16.10.1 Heritage Area
Heritage structures within Nadaun Planning Area shall be considered as per the regulations
The existing heritage buildings and structures within the Nadaun Planning Area shall be notified
but not limited to those identified in the Development Plan. The Competent Authority shall be
responsible for identifying such buildings. The historical structures as mentioned below with in
Nadaun planning area are of regional and local importance and should follow the Heritage area
regulations mentioned below:
1. Nadaun fort
2. Other heritage structure of local importance namely
Samadhi of Dhyanu Bhagat,
Baoli or Step Wells,
Paudiyan or Steps Ghats (Matta wali Paudiyan and Kaji Pattan Paudiyan)
The following regulations shall be applicable in Heritage Areas, namely:-
1.
The façade of the building/blocks shall be maintained in its pristine context in case of
reconstruction of existing buildings, however the internal changes shall be undertaken after
a thorough heritage audit of the structure.
2.
In case of re-construction on old building lines, the existing plinth area, number of storeys
and floor heights shall not be altered.
8503
jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939
3.
Constructions shall be permissible on the vacant sites subject to the condition that the height
of such buildings does not exceed the height of surrounding heritage buildings and also does
not obstruct the view in any way.
4.
Sensitive reconstruction is permissible but only for buildings that are dilapidated/
structurally unsafe as certified by a Structural Engineer and corroborated by the Heritage
Conservation Committee of the Himachal Pradesh. The reconstruction should not follow the
prevailing byelaws but should be in such a manner which ensures that the building/ precinct
character is not diminished.
5.
The existing parks, green & open spaces shall be preserved/restored as such to enhance the
historical structures & elements and integrate them in the new proposal with minimum
alterations.
16.10.1.1 Restrictions on Development or Re-development in Heritage Areas
1.
No development or redevelopment or engineering operation or additions / alterations,
repairs, renovations including painting of the building, replacement of special features or
plastering or demolition of any part thereof of the said listed buildings or listed precincts or
listed natural feature areas shall be allowed except with the prior permission of the
Competent Authority. Before granting such permission, the agency concerned shall consult
the Heritage Conservation Committee appointed by the State Government and shall act in
according with the advice of the Heritage Conservation Committee.
2.
Provided that, before granting any permission for demolition or major alterations / additions
to listed buildings (or buildings within listed streets or precincts), or construction at any
listed natural features, or alteration of boundaries of any listed natural feature areas,
objections and suggestions from the public shall be invited and shall be considered by the
Heritage Conservation Committee.
3.
Provided that, only in exceptional cases, for reasons to be recorded in writing, the
Competent Authority may refer the matter back to the Heritage Conservation Committee for
reconsideration. However, the decision of the Heritage Conservation Committee after such
reconsideration shall be final and binding.
4.
On the advice of the said Heritage Conservation Committee appointed by the Government
and for reasons to be recorded in writing, the Competent Authority shall follow the
procedure as per Himachal Pradesh Town and Country Planning Act,1977 as amended from
time to time to alter, modify or relax the Development Control Regulations prescribed in the
Development Plan, if required, for the conservation or preservation or retention of historic
or aesthetic or cultural or architectural or environmental quality of any heritage site.
16.10.2 Mixed Land Use along National Highways
For controlling linear mixed use development, the building use permissibility & accessibility to
individual plots as well as large developments shall be governed as below:
1.
In case of building line of the properties adjoining the main highway, a minimum distance
between road and building from the edge of RoW shall be followed as mentioned in table
below.
8504
jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939
Table 0-6: Standards for building lines and control lines for Plain and Rolling terrain for
Built-up area
Sr.
No.
Classification of Road
Minimum
Set-back
from
road
boundary (meters)
1
National & state highways
3
2
Major district roads
3
3
Other district roads
3
4
Village roads
3
Source: IRC: 73-1980
2.
Any new access opening on the highway shall be duly permitted by Competent Authority.
3.
Essential highway amenities and services, namely, petrol pump, service station including
emergency repair services, restaurants, parking lots, motels, police check-post, toll station,
shall be permitted direct access from the National Highway crossing the Nadaun planning
area boundary. Such access shall be provided with proper lay-by as per the guidelines
specified by the Indian Road Congress or Competent Authority.
3.
Boundary walls, fences, advertisements, hedges, trees shall not cause obstruction of view
for the road users.
Restrictions on structures between highway control lines and building line:-
The following activities shall not be allowed between-Right of Way of the National Highway and
the permissible building line of the plots in subject:
1. construct, form or lay out any means of access to, or from, a highway, or
2. erect any building, or
3. make or extend any excavation
16.10.3 Old Market Area (Pattan Bazar)
The development control regulations for the identified Pattan Bazar streets lying in the core urban
area of Nadaun municipal boundary shall be followed as below:
1.
All whole sale shops with activities generating huge traffic, must be shifted to other low
traffic impacting streets.
2.
Activities involving heavy vehicular movements like vehicle repair shops, whole sale shops,
Godowns (specially gas Godowns), service and repair centre, noxious and hazardous
wholesale trades, industrial activities, junk and scrap material shops, building material
shops, automobile shops, ice factories shall be prohibited or relocated to low traffic
impacting streets.
3.
The old market area as demarcated in the Development plan 2035 shall be governed by the
restricted use of different modes of transport. Such restrictions should be in the form of time
segregation and/or vehicle typology.
4.
Building heights to be restricted up to 12 m.
8505
jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939
5.
In case of redevelopment, the existing building line should be maintained.
6.
All hawkers must be in the identified hawking zones as demarcated by the Competent
Authority.
7.
Shops and establishment signboards should follow the height strategy developed by the
Competent Authority.
16.11 Risk Based Classification of Buildings
In order to mitigate any disasters, risk based buildings have been classified in three categories
namely,-
1. High Risk Buildings
2. Medium Risk Buildings
3. Low Risk Buildings
Table 0-7: Risk Based Classification of Buildings for Nadaun Planning Area
Sr.
No.
Risk
Buildings
Planning
Permission
Time *
1.
Residential Buildings
(a)
High
Group Housing Schemes, above 3 Storey
buildings, buildings on slopes more than
30º, any building raised on landfill,
reclaimed land, buildings 2.00 M above the
Highest Flood Level (HFL) up to a distance
of
10.00
Metre,
buildings
with
communication towers and buildings falling
under the corridor of HT/LT lines.
Within 60
days.
(b)
Moderate
All 2-3 storey buildings, buildings on slopes
above 15º and up to 30º.
Within 30
days.
(c)
Low
Single Storey Buildings Constructed On
Slope Less than 15º.
Within 20
days.
2.
Commercial Buildings
(a)
High
Commercial
Shopping
Complexes,
Multiplexes,
Tourism
Units,
Marriage
palaces,
Automobile
Showrooms,
any
building raised on landfill, reclaimed land,
buildings within the minimum setback from
HFL as prescribed in respective DPs,
buildings with communication towers and
buildings falling under the corridor of
HT/LT lines.
Within 60
days.
(b)
Moderate
Double storey shops
Within 30
days.
(c)
Low
Single storey shops
Within 20
days.
3.
Industrial Buildings
(a)
High
Buildings above two storeys, any building
above 10 meters height, any building raised
Within 60
days.
8506
jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939
Sr.
No.
Risk
Buildings
Planning
Permission
Time *
on landfill, reclaimed land, buildings
within the minimum setback from HFL as
prescribed in respective DPs, buildings with
communication towers and buildings falling
under the corridor of HT/LT lines.
(b)
Low
Single storey buildings of 10 meters or less
than 10 meters height.
Within 20
days.
4.
Public and Semi-Public
(a)
High
All buildings except for the buildings
mentioned under Low Risk category
Within 60
days.
b)
Low
Toilets, rain shelters, pump houses and
crematoriums.
Within 20 days.
5.
Mixed Land Use Buildings
(a)
High
All buildings.
Within 60
days.
*: As amended from time to time by the State Govt.
Note:-
i.
The High Risk category of constructions will be supervised by the Registered Private
Professionals and the Structural Safety Certificate & Design will be submitted by the
Registered Structural Engineers.
ii.
The Moderate Risk and Low Risk Category buildings would be given fast track
approval.
16.12 Monitoring of Construction
1.
The applicant shall intimate in writing to the concerned competent authority that the work
of execution of building has reached the plinth level. The competent authority shall inspect
the executed work within 15 days and shall allow the applicant for further construction,
only if the same is found in order.
2.
In case the competent authority does not inspect the site within the prescribed period, the
applicant shall certify that he has carried the construction up to plinth level in accordance
with permission order and consequent upon not conducting the inspection within stipulated
period, the applicant is undertaking the further construction in accordance with permission
order.
3.
If the competent authority on inspection later on observes at any stage that the work has not
been carried in accordance with the approved plan, notice of unauthorized construction or
deviation shall be served upon for restoration of the same to its original condition as
prescribed in the Act or any other action as specified in Rules and Regulations thereunder.
4.
The concerned competent authority, if required, may direct the applicant to revise the
building plan as per requirement of Rules and Regulations and if it is found in order, the
revised map shall be approved.
5.
After completion of the building, the applicant shall submit a completion plan along with a
certificate to the concerned competent authority certifying that the construction has been
completed as per the approved map.
6.
Building shall not be put to use prior to issuance of completion certificate by the competent
authority.
8507
jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939
16.13 No Change of Land Use
No Change of Land use shall be permitted for the Sericulture Land parcels as marked in the
Development Plan, for any other activities which is not subservient to sericulture.
16.14 Regulations for Land Pooling and Re-constitution of Plots
1.
On commencement of this Development Plan, no person shall be allowed to carve out plots
of zig-zag ‘Khasra’ Numbers in his ownership and the same have to be organized along
with other such adjoining parcels of land to ensure proper dimensioned plots to the
purchasers, on one hand and in the interest of urban design, safety, economy, functionality,
aesthetics and optimum use of land, on the other.
2.
Land Pooling scheme shall be worked out on the basis of population and area required for
facilities and amenities for the proposed population.
3.
In a land pooling scheme, the land owners shall surrender a part of their land for circulation,
public facilities and amenities i.e., Public Purposes as per the pooling percentage. The
remaining land shall be made available to the land owners proportionate to their original
plot areas.
4.
The pooling percentage for a land pooling scheme shall be based on the formula below:
Pooling
= Area required for Public Purpose
%age Total Area of Land Pooling Scheme
Where area required for public purpose shall include road/path/circulation, infrastructural
facilities and networks, parking, parks, open spaces, playgrounds and recreational pursuit.
5.
In case of any person whose plot comes within the roads or community amenities, he shall
be suitably relocated within the vicinity of the existing plot to the extent possible.
16.15 Sub-Division of Land Regulations
1.
The Sub-Division of land into plots amounts to “Development” under the Himachal Pradesh
Town and Country Planning Act, 1977 as amended from time to time. No person shall sub-
divide his land unless permitted to do so in accordance with Rules and Regulations in force.
2.
Similarly no Registrar or the Sub-Registrar shall register any sale deed or documents of any
sub-division of land on share basis unless the sub-division of land is duly approved by the
competent authority in accordance with provisions of the Himachal Pradesh Town and
Country Planning Act, 1977 as amended from time to time and sub- division of land
Regulations as contained in this Development Plan.
3.
Natural Nallahs and Khads which passes through land/ land sub-division shall be developed
and maintained according to discharge of water during the peak rainy season. The minimum
distance of building from such Nallahs should be at least 3.00 Metre. The minimum
distance of building from the bank of such Khads (i.e, Man Khad) should not be less than
5.00 Metre.
4.
One side of every residential plot shall abut with minimum 3.00 M wide access road.
8508
jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939
5.
In case of plots or land abutting the existing or proposed roads or paths is of lesser width
than required width, width of the same shall have to be increased to meet requirements of
width for requisite plots.
6.
Minimum width of plot shall be 4.00 M.
7.
Any yard or plot existing at the time of coming into force of these Regulations shall not be
reduced in dimension or area below the minimum requirement set forth herein. The yards or
plots created after the effective date of these Regulations shall meet at least the minimum
requirements established by these Regulations. All the plots registered prior to coming into
force of these Regulations shall be treated as plots irrespective of their size subject to the
condition that 3.00 Metre wide road abutting one side of the plot will be the basic
requirement.
8.
If 3.00 Metre wide road is not available at site and if it is less in width then the owner shall
surrender the remaining width of the road ROW from his plot to make the road as 3.00
Metre wide. In such case the setback shall be considered from the revised ROW of the
access road.
9.
The construction would be allowed on hereditary owned smaller plots on and above 30
sq.m. i.e., minimum plot size for row housing as per Table 0-4.
10.
If the plot size after sub-division is coming less than 30 sq.m., then the plot cannot be sub-
divided further, however independent floors/strata division shall be allowed.
11.
Regulations for the development of a Group Housing Scheme shall be governed by the
Appendix-7 of the Himachal Pradesh Town and Country Planning Rules, 2014 ‘Regulations
for Development of Apartments and Colonies in Real Estate Project’.
12.
Where it is essential to develop a plot by cutting of natural land profile, it shall be the
responsibility of the plot owner to provide retaining and breast walls, according to the
engineering specifications, so that such cutting of natural profile shall not exceed more than
3.50 Metre in height.
13.
Development proposal for a part of land or khasra no. shall be considered. However,
proposal for complete land holding/khasra No. shall be submitted even if planning
permission is required for part of the land provided further that at least one road of adequate
width in view of total area of complete land holding/khasra No. shall have to be proposed to
ensure access for balance area in conformity to following point.
14.
The minimum width of road for sub-division shall be 7.00 m. However, in view of
geographical constraints, width of road/ path may be relaxed to 3.00 m for maximum plot
up to 5 in number. The minimum width of path/ road abutting one side of plot shall be 5.00
m to cluster of plots from 6 to 10 in number. For group of plots between 11 to 20 in number
(2000 to 4000 sq.m.) on one particular access, the minimum vehicular access shall be 7.00
m wide. In case of plots exceeding 20 in number (more than 4000 sq.m.) the minimum
width of road of road shall be 9.00 m.
8509
jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939
16.16 Zoning Regulations
The land in the proposed Development Plan has been categorized into nine Land Use Zones:
I. Residential Use Zone
II. Commercial Use Zone
III. Mixed Use Zone
IV. Industrial Use Zone
V. Public/Semi-Public Use Zone
VI. Recreational Use Zone
VII. Transport Use Zone
VIII. Primary Activity Use Zone
IX. Protected & Undevelopable Use Zone
16.16.1 RESIDENTIAL (R)
The activities Permitted, Restricted and Prohibited in Residential land use zone shall be as given
below:
(a)
Activities Permitted
Residence plotted (detached, semi-detached and row housing), Group housing, work-cum-
residential, Hostels, boarding and lodging houses, Night shelters, guest houses, Educational
buildings (nursery, primary, high school), Religious places, Neighborhood level social, cultural and
recreational facilities with adequate parking provisions, Community halls, Convenience shopping,
local (retail) shopping, Community centers, clubs, Auditoriums, Exhibition and art galleries,
Libraries and gymnasiums, Health clinics, yoga centers, dispensaries, nursing homes and health
centers (20 beds), Public utilities and buildings except service and storage yards, Electrical
distribution depots and water pumping stations,
Nursery and green houses, Services for households (salon, parlors, bakeries, sweet shops, dry
cleaning, internet kiosks etc.), Banks and professional offices not exceeding one floor, Bus stops,
taxi stands, Police posts and post offices, Parks and tot–lots.
(b)
Activities Restricted
Shopping centers, Village council, local council, state and central government offices, Colleges and
research institutions, Petrol pump, Places of entertainment, cinema halls, restaurants and hotels,
Markets for retail goods, IT and IT enabled services, Tourism related services, Motor vehicle
repairing, Workshop, garages, storage of LPG cylinders, Burial grounds, Printing presses
employing not more than 10 persons, Godowns /warehousing of non-perishables, Bus depots
without workshop, Household industries (if the area for such use does not exceed one floor and
there shall be no public display of the goods)
(c)
Activities Prohibited
Heavy, large and extensive industries, Noxious, obnoxious and hazardous industries, Warehousing,
storage godowns of perishables, hazardous, inflammable goods, Wholesale mandis, Junk yards,
Workshops for buses, Slaughter houses, Hospitals treating contagious diseases, Sewage treatment
plants and disposal sites, Water treatment plants, Solid waste dumping grounds, Outdoor and
indoor games stadiums, Shooting range, Zoological garden, botanical garden, bird sanctuary,
International conference centers and all uses not specifically permitted above.
16.16.2 COMMERCIAL USE (C)
The Commercial zone can be sub-divided into:
8510
jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939
1. Retail Shopping Zone and General Business: C1
2. Hospitality/ Hotels/ Lodges: C2
3. Wholesale, Go-downs, Warehousing/ Regulated markets and Service Sector: C3
The activities Permitted, Restricted and Prohibited in Commercial land use zone shall be as given
below:
(a)
Activities Permitted
Retail and wholesale business, mercantile, commercial centres, Wholesale storage yards, Godowns,
covered storage and warehousing, Banks, financial services and stock exchanges, Perishable goods
markets, Business and professional offices, Private institutional offices and semi government
offices,
Shops and shopping malls, Commercial services, Restaurants and hotels, Hostels, boarding houses,
guest houses, Social and welfare institutions, Convenience and neighborhood shopping centres,
Local shopping centres, weekly and formal markets, Bakeries and confectionaries, Cinema halls,
theatres, banquet halls, auditoriums, Community halls, night shelters, Clinics and nursing homes,
Petrol Pumps, IT and IT enabled services, Commercial institutes, Research and training institutes,
Parking lots, Taxi stands, Two-wheeler stands.
(b)
Activities Restricted
Associated residential uses, Warehousing, storage godowns of perishable, inflammable goods, coal,
wood, timber yards, Non- polluting, non- obnoxious light industries, Junk-yards, Service centres,
garages, workshops, Printing presses employing not more than 10 persons, 20 bedded hospitals not
treating contagious diseases and mental patients, Weigh bridges, Gas installation and gas works,
Colleges, polytechnics and higher technical institutes, Sports complex and stadiums, Transient
visitor’s homes, Places of entertainment, Recreational uses and museums, Convention centres,
Religious places, Public Utilities, Telephone Exchanges, Police posts and post offices, Picnic Hut,
Truck terminal, bus depots and parking.
(c)
Activities Prohibited
Polluting industries, Heavy, extensive, noxious, obnoxious, hazardous and extractive industrial
units, Hospitals, research laboratories treating contagious diseases, Poultry farms, dairy farms,
slaughter houses, Sewage treatment plants and disposal sites, Solid waste treatment plants and
dumping grounds, Agricultural uses, Storage of perishable and inflammable commodities,
Quarrying of gravel, sand, clay and stone, Zoological gardens, botanical gardens and bird
sanctuary, Sports training centres, Courts and all other related activities which may cause nuisance.
16.16.3 MIXED USE (M)
The activities Permitted, Restricted and Prohibited in Mixed land use zone shall be as given below:
(a)
Activities Permitted
In the mixed use zone all activities falling within permitted land use (dominant land use) shall be
minimum 60% and to co-exist with commercial, institutional and recreational which shall include
Residential Plot- Plotted housing and Group housing, Residential-cum-work plot, Employees
housing, Guest House, Boarding and Lodging houses, Hostel, Dharamshala and its equivalent,
Night shelter, Local Level (Convenience/ Local Shopping Centre), Cinema/ Multiplexes, Post
Offices, Parks and Playgrounds, Service industry, Road network with street furniture, Bus Stops,
Taxi stand, Parking, Community hall/barat ghar, Community/ Recreational Hall, Library, Reading
Room, Society Office, Creche and Day Care Centre, Nursing home/ Polyclinic/ Clinical
Laboratory, Religious premises, Gymnasium, Yoga Centres, Banks, clubs, ATM, Police stations,
Police post
8511
jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939
(b)
Activities Restricted
Activities related to non-polluting household industrial land use shall be allowed to a maximum of
10%.
(c)
Activities Prohibited
All other activities especially industrial which are polluting in nature and which will have adverse
impact on the overall activities of this zone.
16.16.4 INDUSTRIAL USE (I)
The activities Permitted, Restricted and Prohibited in Industrial land use zone shall be as given
below:
(a)
Activities Permitted
All kind of non-polluting industries, agro-based and household industries, Loading, unloading
spaces, Warehousing, storage and depots of non-perishable and non- inflammable commodities,
Cold storage and ice factory, Gas Godowns, Wholesale business establishments, Petrol filling
station with garages and service stations, Bus terminals and bus depots and workshops, Parking,
taxi stands, Residential buildings for essential staff and for watch and ward, Public utilities.
(b)
Activities Restricted
Heavy, extensive and other obnoxious, hazardous industries subject to the approval of the
Himachal Pradesh Pollution Control Board, Industrial Research Institute, Technical Educational
Institutions, Junkyards, sports/ stadiums/ playgrounds, Sewage disposal works, electric power
plants, service stations, cemeteries, Govt. semi-govt., private business offices, Banks, financial
institutions and other commercial offices, Agro-based industries, dairy and farming, Gas
installations and gas works, Workshops garages, Hotels and guest houses, Hospitals and medical
centres.
(c)
Activities Prohibited
General business unless incidental to and on the same site with industry, Schools and colleges,
Hotels, motels and caravan parks, Recreational sports or centers, Other non-industrial related
activities, Religious buildings, Irrigated and sewage farms, Major oil depot and LPG refilling
plants, Social buildings and all uses not specifically permitted above.
16.16.5 PUBLIC AND SEMI-PUBLIC USE ZONE (PS)
The Public and Semi Public use zone can be sub divided into:
1. Govt./ Semi Govt. / Public Offices: PS 1
2. Educational and Institutional: PS 2
3. Medical and Health PS 3
4. Heritage and Socio-Cultural: PS 4
5. Utilities and Services: PS 5
The activities Permitted, Restricted and Prohibited in Public and Semi Public use zone (PS - 1 to PS
- 5) shall be as given below:
(a)
Activities Permitted
Government offices, central, state, local and semi-government, public undertaking offices,
Universities and specialized educational institutions, colleges, schools, research and development
centres, Social and welfare centres, Libraries, Hospitals, health centres, dispensaries and clinics,
8512
jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939
Social and cultural institutes, Religious buildings, Marriage halls, community halls, Conference
halls, Museums, art galleries, exhibition halls, auditoriums, Police stations, police lines, jails, Local
state and central govt. offices uses for Defence purpose, Educational and research institutions,
Social and cultural and religious institutions, Local village council facilities, Uses incidental to
govt. offices and for their use, Monuments
(b)
Activities Restricted
Residential flats, residential plots for group housing and staff housing, IT services , Hostels, transit
accommodation, Entertainment and recreational complexes, Nursery and kindergarten, welfare
centre, Open air theatre, playground, Residential club, guest house, Truck terminals, helipads ,
Parking areas, taxi stands, two-wheeler stands
(c) Activities Prohibited
Heavy, extensive and other obnoxious, hazardous industries, Slaughterhouses, Junkyard, Wholesale
mandis, Dairy and poultry farms, farmhouses, Workshops for servicing and repairs, Processing and
sale of farm products and all uses not specifically permitted above
Utilities and Services: PS-6
(a)
Activities Permitted
Post offices, Telegraph offices, public – utilities and buildings, Water Treatment Plant, Sewage
Treatment Plant, Solid waste Treatment Plant solid waste dumping grounds, Radio transmitter and
wireless stations, telecommunication centres, telephone exchange, Water supply installations,
Sewage disposal works, Service stations, Cemeteries/burial grounds and cremation grounds, Power
plants/ electrical substation, Radio and television station, Fire stations
(b)
Activities Restricted
Service industry, Warehouse/storage godowns, Health centre for public and staff or any other use
incidental to public utilities and services, Information/Payment kiosk, Incidental/ancillary
residential use, Truck terminals, helipads, Commercial uses centre
(c) Activities Prohibited
Any building or structure which is not required for uses related to public utilities and activities is
not permitted therein. Heavy, extensive and other obnoxious, hazardous industries and all uses not
specifically permitted above.
16.16.6 RECREATIONAL USE ZONE (R)
The activities Permitted, Restricted and Prohibited in Recreational Use Zone shall be as given
below:
(a)
Activities Permitted
Regional parks, district parks, playgrounds, Botanical/zoological garden, Bird sanctuary, Clubs,
stadiums (indoor), outdoor stadiums with/ without health centre for players and staff, Picnic huts,
holiday resorts, Shooting range, Sports training centres, specialized parks/maidans for multiuse,
swimming pool, Special recreation and special educational areas, Library, public utilities.
(b) Activities Restricted
Building and structures ancillary to use permitted in open spaces and parks such as stand for
vehicles on hire, taxis and scooters, bus and railway passenger terminals, Facilities such as police
post, fire post, post and telegraph office, Commercial use of transit nature like cinema, circus and
other shows, Public assembly halls, Restaurants and caravan parks, Sports stadium, open air
cinemas
8513
jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939
(c) Activities Prohibited
Any building or structure which is not required for open air recreation, dwelling unit except for
watch and ward personnel and uses not specifically permitted therein.
16.16.7 TRANSPORT USE ZONE (T)
The activities Permitted, Restricted and Prohibited in Transport use zone shall be as given below:
(a)
Activities Permitted
All types of roads, Rail terminal, goods terminal, circulations, Bus stops and Bus and Truck
terminals
Taxi stands, Parking areas, Filling stations, Transport offices, booking offices, Night shelter,
boarding houses, Banks, Restaurants, Workshops and garages, Automobile spares and services,
Godowns, Loading and unloading platforms (with/without cold storage facility), weigh bridges,
Ware houses, Storage depots, Utility networks (drainage, sewage, power, tele-communications)
(b)
Activities Restricted
Way side shops and restaurants, Authorized/Planned Vending areas, Incidental/ancillary residential
use, Emergency health care centre, Tourism related projects, All ancillary (complimentary) uses for
above categories (subject to decision of the Authority)
(c) Activities Prohibited
Use/activity not specifically related to transport are not permitted herein and all uses are not
specifically permitted as above.
16.16.8 PRIMARY ACTIVITY USE (PA)
Primary Activity can be sub divided into
1. Agriculture: PA 1
2. Plantation: PA 2
3. Forest: PA 3
The activities Permitted, Restricted and Prohibited in Primary Activity zone shall be as given
below:
(a)
Activities Permitted
Dwelling for the people engaged in the farm (rural settlement), Farm-houses and accessory
buildings, Agriculture, horticulture and forestry, poultry, piggeries and dairy farm, Cottage
industries, storage, processing and sale of farm produce, Petrol and other fuel filling stations,
Fishing, Public utility and facility buildings.
(b)
Activities Restricted
Farm houses, Extensive industry, brick kilns, Sewage disposal works, Electric power plant,
Quarrying of gravel, sand, clay or stone, Service industries accessory to obnoxious and hazardous
industries, School and library and religious buildings.
(c)
Activities Prohibited
Residential use except those ancillary uses permitted in agricultural use, Heavy extensive, noxious,
obnoxious and hazardous industries, any activity which is creating nuisance and is obnoxious in
nature.
8514
jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939
16.16.9 PROTECTED AND UNDEVELOPABLE USE ZONE (E)
The protective and undevelopable use zone shall be sub divided into
1. Water bodies: E1
2. Protected Forest: E2
3. Green Belt/Buffer: E3
4. Undevelopable use zone: E4
1.
Water bodies
(a)
Activities Permitted
Rivers, canals, Streams, water spring, Ponds, lakes, Reservoir, Water Catchment Area
(b)
Activities Restricted
Fisheries, Boating, water theme parks, water sports, lagoons, Any other use/activity incidental to
Water Bodies Use is permitted.
(c) Activities Prohibited
Use/activity not specifically related to Water Bodies Use not permitted herein. All uses not
specifically permitted above.
2.
Protected Forest:
(a)
Activities Permitted
Agro and Social forestry, Felling or removing trees or timber or other forest-produce from such
forests for their own use for the purposes of trade.
(b)
Activities Restricted
Cutting, sawing and conversion, Removal of trees and timber, Collection, manufacture and removal
of forest-produce, from protected forests.
(c) Activities Prohibited
Any kind of development residential, industrial or commercial, Quarrying of stone, Burning of lime
or charcoal, Collection or subjection to any manufacturing process, or removal of, any forest-
produce in any such forest, Breaking up or clearing for cultivation, for building, for herding cattle
or for any other purpose, of any land in any such forest.
3.
Undevelopable use zone:
Undevelopable use zone shall be identified as all earthquake/landslide prone, cliffs and
environmentally hazardous area, areas adjacent to fault lines, areas with slope higher than 45
degree (NBC), flood plain and other areas identified by State Disaster Management Authority and
all the environmentally sensitive areas.
(a)
Activities Permitted
Afforestation
(b)
Activities Restricted
Quarrying of gravel, sand, clay or stone, Check dam to store water after clearance from the
authority, Special outdoor recreations
(c)
Activities Prohibited
All uses not specifically permitted above
8515
jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939
BIBLIOGRAPHY
1.
Urban Development Department - Himachal Pradesh, http://ud-hp.in/ulblist.html
2.
History of the Punjab Hill States, J. Hutchinson and J. Ph. Vogel, 1933
3.
Brief
Industrial
Profile
of
Hamirpur
District,
MSME
(2012).
Available
at
dcmsme.gov.in/dips/DIP%20Hamirpur.pdf.
4.
District Census Handbook, Hamirpur, Himachal Pradesh (2011) Village and Town Wise
Primary Census Abstract (PCA). Available at www.censusofindia.com.
5.
District Disaster Management Plan, Hamirpur, Himachal Pradesh (2012). Available at DC
office, Hamirpur district.
6.
District Statistical Handbook, Hamirpur, Himachal Pradesh (2014-15). Available at District
Statistics Office, Hamirpur.
7.
Geological Study Report, Hamirpur District
8.
Study on the Drainage System, mineral potential and feasibility of mining in river/ stream
beds of District Hamirpur, Mining Dept., Geological Wing, Hamirpur Economic Survey,
Himachal Pradesh (2014-15).
9.
Ground Water Information Booklet, Hamirpur District, Himachal Pradesh (2013). Available
at www.cgwb.gov.in/District_Profile/HP/Hamirpur.pdf.
10.
Socio Economic Indicators of Himachal Pradesh, Department of Economics and Statistics,
Shimla, Himachal Pradesh (2013). Available at State Statistical Office, Shimla.
11.
State Environment Report, Himachal Pradesh (2012).
12.
Government of India, 2012, District Disaster Management Plan: District Kangra, Himachal
Pradesh, the Government of India-UNDP Disaster Risk Reduction (DRR) Programme
(2009-12), UNDP.
13.
World Health Organization, 2007, Risk reduction and emergency preparedness:
14.
Urban and Regional Development Plan Formulation and Implementation Guidelines (2015).
15.
Village and Town Directory, Hamirpur District (1991, 2001 and 2011). Available at Census
of India Office, New Delhi
16.
Himachal Pradesh Town and Country Planning (Amendment) Rules, 2015
17.
http://www.indianrajputs.com/view/nadaun
18.
http://himachal.gov.in
19.
http://areaprofiler.gov.in/aboutUsIntgeratedPES.do?stateCode=0&lbCode=736&languageId
=1
20.
http://hppwd.gov.in/Download/NH%20Detail.pdf
21.
http://sjvn.nic.in/project-details.htm?14
22.
http://wikimapia.org/21152046/Dhaulasidh-H-E-Project
23.
http://www.sappi.com/regions/sa/SappiSouthernAfrica/Sappi%20Forests/Tree%20Faming
%20Guidelines/Part%203_Forest%20Engineering_Chapter%207_Terrain%20Classification
8516
jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939
8517
jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939
8518
jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939
8519
jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939
8520
jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939
8521
jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939
8522
jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939
8523
jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939
8524
jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939
8525
jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939
8526
jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939
8527
jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939
8528
jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939
8529
jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939
8530
jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939
8531
jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939
i;kZoj.k] foKku ,oa izkS|ksfxdh foHkkx
vf/klwpuk
f'keyk&2] 1 uoEcj] 2017
la[;k% ,lVhbZ&ch¼3½&1@2016-&&fgekpy izns'k ds jkT;iky] Hkkjr ds lafo/kku ds vuqPNsn 309
ds ijUrqd }kjk iznRr 'kfDr;ksa dk iz;ksx djrs gq,] fgekpy izns'k yksd lsok vk;ksx ds ijke'kZ ls]
fgekpy izns'k] i;kZoj.k] foKku ,oa izkS|ksfxdh foHkkx esa fof/k vf/kdkjh] oxZ&II ¼jktif=r½ vfyfid
oxhZ; lsok,a] ds in ds fy, bl vf/klwpuk ls layXu mikcU/k&^d* ds vuqlkj HkrhZ vkSj izksUufr fu;e
cukrs gS] vFkkZr~%&
1- laf{kIr uke vkSj izkjEHk-&&¼1½ bu fu;eksa dk laf{kIr uke fgekpy izns'k i;kZoj.k] foKku ,oa
izkS|ksfxdh foHkkx] fof/k vf/kdkjh] oxZ&II ¼jktif=r½ vfyfid oxhZ; lsok,a] HkrhZ vkSj izksUufr fu;e] 2017
gSA
¼2½ ;g fu;e jkti=] fgekpy izns'k esa izdkf'kr gksus dh rkjh[k ls izo`Rr gksaxsA
vkns'k }kjk]
gLrk{kfjr@&
vfr0 eq[; lfpoA
&&&&&&&
mikcU/k&^d^
fgekpy izns'k Ik;kZoj.k] foKku ,oa izkS|ksfxdh foHkkx esa fof/k vf/kdkjh] oxZ&II ¼jktif=r½ ds in ds fy,
HkrhZ vkSj izksUufr fu;e
1- in dk uke-&fof/k vf/kdkjhaA
2- inksa dh la[;k- 01 ¼,d½A
3- oxhZdj.k-&oxZ&II ¼jktif=r½A
4- osrueku-&¼I½ fu;fer in/kkjh ds fy, osrueku] is cS.M% `10300&34800@& tek
` 4]400@& xzsM isA
¼II½ lafonk ij fu;qDr deZpkjh ds fy, miyfC/k;ka% LrEHk la[;k 15&d esa fn, x, C;kSjs ds
vuqlkj `14700@& izfrekl A
5- ^p;u^ in vFkok ^vp;u^ in-&ykxw ughaA
6- lh/kh HkrhZ ds fy;s vk;q-& 18 ls 45 o"kZ
8532
jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939
ijUrq lh/ks HkrhZ fd, tkus okys O;fDr;ksa ds fy, Åijh vk;q lhek] rnFkZ ;k lafonk ds vk/kkj ij
fu;qDr fd, x, O;fDr;ksa lfgr] igys ls gh ljdkj dh lsok esa jr vH;kfFZk;ksa dks ykxw ugha gksxh%
ijUrq ;g vkSj fd ;fn rnFkZ ;k lafonk ds vk/kkj ij fu;qDr fd;k x;k vH;FkhZ] bl :i esa
fu;qfDr dh rkjh[k dks vf/kd vk;q dk gks x;k gks] rks og rnFkZ ;k lafonk ds vk/kkj ij fu;qfDr ds
dkj.k fofgr vk;q esa f'kfFkyhdj.k dk ik= ugha gksxk %
ijUrq ;g vkSj fd vuqlwfpr tkfr;ksa@vuqlwfpr tutkfr;ksa@vU; fiNM+s oxksZa rFkk vU; oxksZa ds
O;fDr;ksa ds fy, Åijh vk;q lhek esa mruh gh NwV nh tk,xh] ftruh fgekpy izns'k ljdkj ds lk/kkj.k
;k fo'ks"k vkns'k ¼vkns'kksa½ ds v/khu vuqKs; gS%
ijUrq ;g vkSj Hkh fd leLr ifCyd lsDVj fuxeksa rFkk Lok;Ùk fudk;ksa ds deZpkfj;ksa dks tks ,sls
ifCyd lsDVj] fuxeksa rFkk Lok;Ùk fudk;ksa ds izkjfEHkd xBu ds le;] ifCyd lsDVj fuxeksa@Lok;Ùk
fudk;ksa esa vkesyu ls iwoZ ljdkjh deZpkjh Fks] lh/kh HkrhZ ds fy, vk;q dh ,slh lhek esa gh fj;k;r nh
tk,xh] tSlh ljdkjh deZpkfj;ksa dks vuqKs; gSA ,slh fj;k;r ifCyd lsDVj fuxeksa@Lok;Ùk fudk;ksa ds
,sls deZpkfjo`Un dks vuKs; ugha gksxh tks rRi'pkr~ ,sls fuxeksa@ Lok;Ùk fudk;ksa }kjk fu;qDr fd, x,
Fks@fd, x, gSa vkSj mu ifCyd lsDVj fuxeksa@Lok;Ùk fudk;ksa ds izkjfEHkd xBu ds i'pkr~ ,sls
fuxeksa@Lok;Ùk fudk;ksa dh lsok esa vfUre :i ls vkesfyr fd, x, gSa@fd, x, FksA
fVIi.k%&lh/kh HkrhZ ds fy, vk;q lhek dh x.kuk ml o"kZ ds izFke fnol ls dh tk,xh ftlesa in
¼inksa½ dks vkosnu vkefU=r djus ds fy,] ;FkkfLFkfr] foKkfir fd;k x;k gS ;k fu;kstuky;ksa dks
vf/klwfpr fd;k x;k gSA
7- lh/ks HkrhZ fd, tkus okys O;fDr ¼O;fDr;ksa½ ds fy, visf{kr U;wure 'kSf{kd vkSj vU;
vgZrk,a-&¼d½ vfuok;Z vgZrk-&1- fdlh ekU;rk izkIr fo'ofo|ky; ls fof/k esa Lrkud dh mikf/kA
2- fdlh Hkh ljdkjh@v/kZ ljdkjh [email protected]@xSj ljdkjh laxBukas@izkbosV lSDVj
vkfn esa dk;Z djrs le; fof/kd ekeyksa esa de ls de ikap o"kZ dk vuqHkoA
¼[k½ okaNuh; vgZrk-&1- i;kZoj.k fof/k rFkk eqdn~nesckth ¼fyfVxs'ku½ esa vuqHko j[kus okys
vH;kfFkZ;ksa dks vf/keku fn;k tk,xkA
2- fgekpy izns'k dh :f<+;ksa] jhfr;ksa vkSj cksfy;ksa dk Kku vkSj izns'k esa fo|eku fof'k"V
n'kkvksa esa fu;qfDr ds fy, mi;qDrrkA
8- lh/ks HkrhZ fd, tkus okys O;fDr ¼O;fDr;ksa½ ds fy, fofgr vk;q vkSj 'kSf{kd vgZrk,a izksUufr
O;fDr ¼O;fDr;ksa½ dh n'kk esa ykxw gksaxh ;k ugha-&vk;q% Ykkxw ughaA
'kSf{kd vgZrk% ykxw ughaA
9- ifjoh{kk dh vof/k] ;fn dksbZ gks-&¼d½ nks o"kZ] ftldk ,d o"kZ ls vf/kd ,slh vkSj vof/k ds
fy, foLrkj fd;k tk ldsxk tSlk fd l{ke izkf/kdkjh fo'ks"k ifjfLFkfr;ksa esa vkSj dkj.kksa dks fyf[kr esa
vfHkfyf[kr djds vkns'k nsaA
¼[k½ lafonk ds vk/kkj ij] lsok/k`fr ds vk/kkj ij fu;qfDr ij] vf/kof"kZrk ds i'pkr~ iqufuZ;kstu
ij vkSj vkesyu ij dksbZ ifjoh{kk ugha gksxhA
10- HkrhZ dh i)fr-&&HkrhZ lh/kh gksxh ;k izksUufr ;k lSd.MeSaV ;k LFkkukUrj.k }kjk vkSj fofHkUu
i)fr;ksa }kjk Hkjs tkus okys in ¼inksa½ dh izfr'krrk-&'krizfr'kr lh/kh HkrhZ }kjk] fu;fer vk/kkj ij ;k
lafonk ds vk/kkj ij HkrhZ }kjkA
8533
jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939
11- [email protected]@LFkkukUrj.k }kjk HkrhZ dh n'kk esa] Jsf.k;ka ¼xzsM½ ftuls
[email protected]@LFkkukUrj.k fd;k tk,xk-&ykxw ughaA
12- ;fn foHkkxh; izksUufr lfefr fo|eku gks] rks mldh lajpuk-&¼d½ foHkkxh; izksUufr
lfefr%&& ykxw ughaA
¼[k½ foHkkxh; LFkk;hdj.k lfefr%&& tSlh ljdkj }kjk le;≤ ij xfBr dh tk,A
13- HkrhZ djus esa fdu ifjfLFkfr;ksa esa fgekpy izns'k yksd lsok vk;ksx ls ijke'kZ fd;k tk,xk-
&tSlk fd fof/k }kjk visf{kr gksA
14- lh/kh HkrhZ ds fy, vfuok;Z vis{kk-&fdlh lsok ;k in ij fu;qfDr ds fy, vH;kFkhZ
dk Hkkjr dk ukxfjd gksuk vfuok;Z gSA
15- lh/kh HkrhZ }kjk in ij fu;qfDr ds fy, p;u-&lh/kh HkrhZ ds ekeysa esa in ij fu;qfDr ds
fy, p;u] lk{kkRdkj@O;fDrRo ijh{k.k ds vk/kkj ij fd;k tk,xk ;k ;fn ;FkkfLFkfr] fgekpy izns'k
yksd lsok vk;ksx ;k vU; HkrhZ vfHkdj.k@izkf/kdj.k ,slk djuk vko';d ;k lehphu le>s] rks iwoZ esa
yh xbZ NaVuh ijh{kk ¼oLrqfu"B izdkj dh½@fyf[kr ijh{kk ;k O;kogkfjd ijh{kk;k 'kkjhfjd ijh{k.k ds
vuqlkj lk{kkRdkj@O;fDrRo ijh{k.k ds vk/kkj ij fd;k tk,xk] ftldk Lrj@ikB~;Øe ;kfn] ;FkkfLFkfr]
vk;ksx@vU; HkrhZ vfHkdj.k@izkf/kdj.k }kjk vo/kkfjr fd;k tk,xkA
15&d lafonk fu;qfDr }kjk in ij fu;qfDr ds fy, p;u-&bu fu;eksa esa fdlh ckr ds gksrs gq,
Hkh in ij lafonk fu;qfDr;ka uhps fn, x, fucU/kuksa vkSj “krksZa ds v/;/khu dh tk,axh%
¼I½ ladYiuk-&¼d½ bl ikWfylh ds v/khu fgekpy izns'k Ik;kZoj.k] foKku ,oa izkS|ksfxdh foHkkx esa
fof/k vf/kdkjh dks lafonk ds vk/kkj ij izkjEHk esa ,d o"kZ ds fy, yxk;k tk,xk] ftls o"kkZuqo"kZ vk/kkj ij
vkxs c<+k;k tk ldsxk%
ijUrq lafonk vof/k esa o"kkZuqo"kZ vk/kkj ij [email protected] ds fy, lEc) foHkkxk/;{k ;g
izek.k i= tkjh djsxk fd lafonk ij fu;qDr O;fDr dh lsok vkSj vkpj.k o"kZ ds nkSjku larks"ktud jgk gS
vkSj dsoy rHkh mldh lafonk dh vof/k uohd`r@foLrkfjr dh tk,xhA
¼[k½ in dk fgekpy izns'k yksd lsok vk;ksx ds dk;Z{ks= esa vkuk-&iz/kku lfpo@ lfpo
¼Ik;kZoj.k] foKku ,oa izkS|ksfxdh½] fgekpy izns'k fjDr inksa dks lafonk ds vk/kkj ij Hkjus ds fy, ljdkj
dk vuqeksnu izkIr djus ds i'pkr~ v/;is{kk dks lEc) HkrhZ vfHkdj.k] vFkkZr~ fgekpy izns'k yksd lsok
vk;ksx ds le{k j[ksxkA
¼x½ p;u] bu fu;eksa esa fofgr ik=rk 'krksZa ds vuqlkj fd;k tk,xkA
¼II½ lafonkRed miyfC/k;ka-&lafonk ds vk/kkj ij fu;qDr fof/k vf/kdkjh dks `14]700@& dh
lesfdr fu;r lafonkRed jde ¼tks in ds is cSaM dk U;wure tek xzsM is ds cjkcj gksxh½ izfrekl lanRr
dh tk,xhA ;fn lafonk esa ,d o’kZ ls vf/kd dh c<+kSrjh dh tkrh gS] rks i'pkr~orhZ o’kZ@o’kksZa ds fy,
lafonkRed miyfC/k;ksa esa ` 441@& dh jde ¼in ds is caSM dk U;wure tek xzsM is dk 3 izfr'kr½
okf’kZd o`f) ds :i esa vuqKkr dh tk,xhA
¼III½ fu;qfDr@vuq'kklfud izkf/kdkjh-&lfpo ¼Ik;kZoj.k] foKku ,oa izkS|ksfxdh½] fgekpy izns'k
ljdkj fu;qfDr vkSj vuq'kklu izkf/kdkjh gksxkA
8534
jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939
¼IV½ p;u izfØ;k-&lafonk fu;qfDr dh n'kk esa in ij fu;qfDr ds fy, p;u]
lk{kkRdkj@O;fDrRo ijh{k.k ds vk/kkj ij fd;k tk,xk ;k ;fn ,slk djuk vko';d ;k lehphu le>k
tk,] rks iwoZ esa yh xbZ NaVuh ijh{kk ¼oLrqfu"B] izdkj dh½@fyf[kr ijh{kk ;k O;kogkfjd ijh{kk ;k
'kkjhfjd ijh{k.k ds vuqlkj lk{kkRdkj@O;fDrRo ds vk/kkj ij fd;k tk,xk] ftldk Lrj@ikB~;Øe vkfn
lEc) HkrhZ vfHkdj.k vFkkZr~ fgekpy izns'k yksd lsok vk;ksx }kjk vo/kkfjr fd;k tk,xkA
¼V½ lafonkRed fu;qfDr ds fy, p;u lfefr-&tSlh lEc) HkrhZ vfHkdj.k vFkkZr~ fgekpy izns'k
yksd lsok vk;ksx }kjk le;≤ ij xfBr dh tk,A
¼VI½ djkj-&vH;kFkhZ dks] p;u ds i'pkr~ bu fu;eksa ls layXu mikcU/k&**[k** ds vuqlkj djkj
gLrk{kfjr djuk gksxkA
¼VII½ fucU/ku ,oa 'krsZa-&¼d½ lfa onk ds vk/kkj ij fu;qDr O;fDr dks `14]700@& dh lesfdr
fu;r lafonkRed jde ¼tks is caSM dk U;wure tek xzsM is ds cjkcj gksxh½ izfrekl lanRr dh tk,xhA
lafonk ij fu;qDr O;fDr vkxs c<+k, x, o’kZ@o’kksZa ds fy, lafonkRed jde esa `441@& ¼in is
caSM dk U;wure tek xzsM is dk rhu izfr'kr½ dh o`f) dk gdnkj gksxk vkSj vU; dksbZ lgc) izlqfo/kk,]a
tSls ofj’B@p;u osrueku bR;kfn ugha fn;k tk,xkA
¼[k½ lafonk ij fu;qDr O;fDr dh lsok iw.kZr;k vLFkk;h vk/kkj ij gksxhA ;fn lafonk ij fu;qDr
O;fDr dk dk;[email protected] Bhd ugha ik;k tkrk gS] rks fu;qfDr i;Zoflr ¼lekIr½ fd, tkus ds fy,
nk;h gksxhA
¼x½ lafonk ij fu;qDr O;fDr ,d ekl dh lsok iwjh djus ds i'pkr ,d fnu ds vkdfLed
vodk'k dk gdnkj gksxkA rFkkfi lafonk ij fu;qDr deZpkjh 135 fnu ds izlwfr vodk'k] 10 fnu ds
fpfdRlk vodk'k vkSj 5 fnu ds fo'ks"k vodk'k ds fy, Hkh gdnkj gksxk@gksxhA
lafonk ij fu;qDr efgyk deZpkjh iwjh lsok ds nkSjku xHkZikr gks tkus lfgr xHkZikr djkus dh
n'kk esa] izkf/kd`r ljdkjh fpfdRlk vf/kdkjh }kjk tkjh fpfdRlk izek.k i= izLrqr djus ij iSarkfyl fnu
ls vf/kd izlwfr vodk'k ¼thfor cPpksa dh la[;k dk fopkj fd, fcuk½ ds fy, Hkh gdnkj gksxhA
og fpfdRlk izfriwfrZ vkSj ,y0Vh0lh0 vkfn ds fy, Hkh gdnkj ugha gksxk@gksxhA lafonk ij
fu;qDr O;fDr dks mijksDr ds flok; vU; fdlh izdkj dk dksbZ vodk'k vuqKkr ugha gksxk %
ijUrq vuqi;qDr vkdfLed vodk'k o fpfdRlk vodk'k ,d dSysaMj o’kZ rd lafpr fd;k tk
ldsxk vkSj vkxkeh dSysaMj o’kZ ds fy, vxzuhr ugha fd;k tk,xkA
¼?k½ fu;U=d vf/kdkjh ds vuqeksnu ds fcuk dÙkZO; ¼M~;wVh½ ls vuf/kd`r vuqifLFkfr ls Lor% gh
lafonk dk i;kZolku ¼lekiu½ gks tk;sxk] rFkkfi vkiokfnd ekeyksa esa tgka ij fpfdRlk vk/kkj ij dÙkZO;
ls vuf/kd`r vuqifLFkfr ds gkykr lafonk ij fu;qDr O;fDr ds fu;U=.k ls ckgj gks rks mlds
fu;ferhdj.k ds ekeys esa fopkj djrs le; ,slh vof/k vioftZr ugha dh tk,xh] ijUrq in/kkjh dks bl
ckor le; ij fu;U=.k vf/kdkjh dks lwfpr djuk gksxkA rFkkfi] lafonk ij fu;qDr O;fDr dÙkZO; ls
vuqifLFkfr dh ,slh vof/k ds fy, lafonkRed jde dk gdnkj ugha gksxk%
ijUrq mls ljdkj ds izpfyr vuqns'kksa ds vuqlkj fpfdRlk vf/kdkjh }kjk tkjh chekjh@vkjksX;
dk izek.k&i= izLrqr djuk gksxkA
8535
jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939
¼³½ lafonk ij fu;qDr in/kkjh ftlus rSukrh ds ,d LFkku ij rhu o"kZ dk lsokdky iw.kZ dj
fy;k gS] vko';drk ds vk/kkj ij LFkkukUrj.k ds fy, ik= gksxk] tgka Hkh iz'kklfud vk/kkj ij ,slk
djuk visf{kr gksA
¼p½ p;fur vH;kFkhZ dks ljdkjh@jftLVªhd`r fpfdRlk O;olk;h ls viuk vkjksX; izek.k&i=
izLrqr djuk gksxkA ckjg lIrkg ls vf/kd xHkZorh efgyk vH;kFkhZ izlo gksus rd vLFkk;h rkSj ij
vuqi;qDr cuh jgsxhA efgyk vH;FkhZ dk fdlh izkf/kd`r fpfdRlk vf/kdkjh@O;olk;h }kjk mi;qDrrk ds
fy, iqu% ijh{k.k fd;k tk,xkA
¼N½ lafonk ij fu;qDr O;fDr dk] ;fn vius inh; drZO;ksa ds lEcU/k esa nkSjs ij tkuk visf{kr
gks] rks og mlh nj ij] tSlh fu;fer izfrLFkkuh deZpkfj;ksa dks osrueku ds U;wure ij ykxw gS] ;k=k
HkRrs@nSfud HkRrs dk gdnkj gksxk@gksxhA
¼t½ fu;fer deZpkfj;ksa dh n'kk esa] ;Fkk ykxw lsok fu;eksa ds micU/k tSls ,Q0vkj0&,l0vkj0]
NqV~Vh fu;e] lk/kkj.k Hkfo’; fuf/k fu;e] isa'ku fu;e rFkk vkpj.k fu;e vkfn lafonk ij fu;qDr
O;fDr;ksa dh n'kk esa ykxw ugha gksaxs A os bl LrEHk esa ;Fkkof.kZr miyfC/k;ksa vkfn ds fy, gdnkj gksaxs A
16- vkj{k.k-&lsok esa fu;qfDr] fgekpy izns'k ljdkj }kjk le;≤ ij vuqlwfpr
tkfr;ksa@vuqlwfpr tutkfr;ksa@vU; fiNMs+ oxksZa vkSj vU; izoxksZa ds O;fDr;ksa ds fy, lsok esa vkj{k.k dh
ckcr tkjh fd, x, vuqns'kksa ds v/khu gksxhA
17- foHkkxh; ijh{kk-&lsok esa izR;sd lnL; dks le;≤ ij ;Fkk la'kksf/kr fgekpy izns'k
foHkkxh; ijh{kk fu;e] 1997 esa ;Fkk fofgr foHkkxh; ijh{kk ikl djuh gksxhA
18- f'kfFky djus dh 'kfDr-&Tkgka jkT; ljdkj dh ;g jk; gks fd ,slk djuk vko';d ;k
lehphu gS] ogka og dkj.kksa dks fyf[kr esa vfHkfyf[kr djds vkSj fgekpy izns'k yksd lsok vk;ksx ds
ijke'kZ ls] vkns'k }kjk] bu fu;eksa ds fdUgha micU/kksa dks fdlh oxZ ;k O;fDr;ksa ds izoxZ ;k inksa dh ckor
f'kfFky dj ldsxhA
&&&&&&&&
mikcU/k&**[k**
fof/k vf/kdkjh vkSj fgekpy izns'k ljdkj ds e/; lfpo ¼Ik;kZoj.k] foKku ,oa izkS|ksfxdh] fgekpy izns'k
ljdkj ds ek/;e ls fu"ikfnr dh tkus okyh lafonk@djkj dk izk#i
;g djkj Jh@Jherh---------------------------------------------------------------iq=@iq=h Jh-----------------------------------------------------------
fuoklh------------------------------------------------------------------------------------------- lafonk ij fu;qDr O;fDr ¼ftls blesa blds i'pkr~
*izFke i{kdkj* dgk x;k gS½] vkSj fgekpy izns'k ds jkT;iky ds e/;] lfpo ¼Ik;kZoj.k] foKku ,oa
izkS|ksfxdh½] fgekpy izns'k ljdkj ¼ftls blesa blds i'pkr~ *f}rh; i{kdkj* dgk x;k gS½ ds ek/;e ls
vkt rkjh[k-----------------------dks fd;k x;kA
*f}rh; i{kdkj* us mijksDr *izFke i{kdkj* dks yxk;k gS vkSj *izFke i{kdkj* us fof/k vf/kdkjh ds
:i esa lafonk ds vk/kkj ij fuEufyf[kr fucU/ku vkSj “krksZa ij lsok djus ds fy, lgefr nh gS%&&
1- ;g fd izFke i{kdkj fof/k vf/kdkjh ds :i esa----------------------------------------------ls izkjEHk gksus vkSj -------
-----dks lekIr gksus okys fnu rd] ,d o’kZ dh vof/k ds fy, f}rh; i{kdkj dh lsok esa
jgsxkA ;g fofufuZ’V :i ls mfYyf[kr fd;k x;k gS vkSj nksuksa i{kdkjksa }kjk djkj ik;k
8536
jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939
x;k gS fd izFke i{kdkj dh f}rh; i{kdkj ds lkFk lafonk vkf[kjh dk;Z fnol dks vFkkZr~ ----
-------------------------rkjh[k dks Lo;aeso gh i;Zoflr ¼lekIr½ le>h tk,xh vkSj lwpuk uksfVl
vko';d ugha gksxk%
ijUrq o’kkZuqo’kZ vk/kkj ij lafonk dh vof/k esa c<[email protected] ds fy, lEc) foHkkxk/;{k
;g izek.k&i= tkjh djsxk fd lafonk ij fu;qDr O;fDr dh lsok vkSj vkpj.k o’kZ ds nkSjku
lUrks’ktud jgk gS vkSj dsoy rHkh mldh lafonk dh vof/k uohd`r@foLrkfjr dh tk,xhA
2- izFke i{kdkj dh lafonkRed jde ` 14]700@& izfrekl gksxhA
3- izFke i{kdkj dh lsok iw.kZr;k vLFkkbZ vk/kkj ij gksxhA ;fn lafonk ij fu;qDr O;fDr dk
dk;[email protected] Bhd ugha ik;k tkrk gS ;k ;fn fu;fer in/kkjh ml fjfDr ds fo:)
fu;qDr@rSukr dj fn;k tkrk gS] ftlds fy, izFke i{kdkj dks lafonk ij yxk;k x;k gS
rks fu;qfDr i;kZoflr ¼lekIr½ fd, tkus ds fy, nk;h gksxhA
4- lafonk ij fu;qDr fof/k vf/kdkjh ,d ekl dh lsok iwjh djus ds i'pkr~ ,d fnu ds
vkdfLed vodk'k dk gdnkj gksxkA rFkkfi] lafonk ij fu;qDr deZpkjh 135 fnu ds izlwfr
vodk'k] 10 fnu ds fpfdRlk vodk'k vkSj 5 fnu ds fo'ks"k vodk'k ds fy, Hkh gdnkj
gksxk@gksxhA lafonk ij fu;qDr efgyk deZpkjh iwjh lsok ds nkSjku xHkZikr gks tkus lfgr
xHkZikr djkus dh n'kk esa] izkf/kd`r ljdkjh fpfdRlk vf/kdkjh }kjk tkjh fpfdRlk izek.k
i= izLrqr djus ij iSarkfyl fnu ls vf/kd izlwfr vodk'kh ¼thfor cPpksa dh la[;k dk
fopkj fd, fcuk½ ds fy, Hkh gdnkj gksxhA og fpfdRlk izfriwfrZ vkSj ,y0Vh0lh0 bR;kfn
ds fy, Hkh gdnkj ugha gksxk@gksxhA lafonkRed fof/k vf/kdkjh dks mijksDr ds flok, fdlh
Hkh izdkj dk vU; dksbZ vodk'k vuqKkr ugha gksxk%
ijUrq vuqi;qDr vkdfLed vodk'k] fpfdRlk vodk'k vkSj fo'ks"k vodk'k ,d dSys.Mj o"kZ
rd lafpr fd;k tk ldsxk vkSj vkxkeh dSy.Mj o"kZ ds fy, vxzuhr ugha fd;k tk,xkA
5- fu;U=d vf/kdkjh ds vuqeksnu ds fcuk dÙkZO; ls vuf/kd`r vuqifLFkfr ls Lor% gh lafonk
dk i;kZolku ¼lekiu½ gks tk,xkA rFkkfi viokfnd ekeyksa esa] tgka ij fpfdRlk vk/kkj ij
lafonk ij fu;qDr O;fDr ds fu;U=.k ls ckgj gks rks ,slh vof/k mlds fu;fefrdj.k ds
ekeys esa fopkj djrs le; vioftZr ugha dh tk,xh] ijUrq in/kkjh dks bl ckcr le; ij
fu;U=.k izkf/kdkjh dks lwfpr djuk gksxkA rFkkfi lafonk ij fu;qDr O;fDr dÙkZO; ls
vuqifLFkfr dh vof/k ds fy, lafonkRed jde dk gdnkj ugha gksxkA
ijUrq mls ljdkj ls izpfyr vuqns'kksa ds vuqlkj fpfdRlk vf/kdkjh }kjk tkjh
chekjh@vkjksX; dk izek.ki= izLrqr djuk gksxkA
6- lafonk ij fu;qDr in/kkjh ftlus rSukrh ds ,d LFkku ij rhu o"kZ dk lsokdky iw.kZ dj
fy;k gS] vko';drk ds vk/kkj ij tgka Hkh iz'kklfud vk/kkj ij ,slk djuk visf{kr gks]
LFkkukUrj.k gsrq ik= gksxkA
7- p;fur vH;FkhZ dks ljdkjh@jftLVªhd`r fpfdRlk O;olk;h ls viuk vkjksX; izek.k&i=
izLrqr djuk gksxkA efgyk vH;fFkZ;ksa dh n”kk esa ckjg lIrkg ls vf/kd dh xHkkZoLFkk izlo
gksus rd mls vLFkk;h rkSj ij vuqi;qDr cuk nsxhA ,slh efgyk vH;FkhZ dk fdlh izkf/kd`r
fpfdRlk vf/kdkjh@O;olk;h }kjk mi;qDrrk ds fy, iqu% ijh{k.k fd;k tkuk pkfg,A
8- lafonk ij fu;qDr O;fDr dk] ;fn vius inh; drZO;ksa ds lEcU/k esa nkSjs ij tkuk visf{kr
gks] rks og mlh nj ij] tSlh fu;fer izfrLFkkuh deZpkjh dks osrueku ds U;wure ij ykxw
gS] ;k=k HkRrs@nSfud HkRrs dk gdnkj gksxk@gksxhA
8537
jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939
9- lafonkRed deZpkjh ¼deZpkfj;ksa½ dh deZpkjh lkewfgd thou chek ;kstuk ds lkFk&lkFk
bZ0ih0,Q0@th0ih0,Q- Hkh ykxw ugha gksxkA
blds lk{;Lo:i izFke i{kdkj vkSj f}rh; i{kdkj us lkf{k;ksa dh mifLFkfr esa blesa loZizFke
mfYyf[kr rkjh[k dks vius&vius gLrk{kj dj fn, gSaA
lkf{k;ksa dh mifLFkfr esa %
1- ------------------------------------------------------------------------------
-------------------------------------------------------------------------------
--------------------------------------------------------------------------------
¼uke o iwjk irk½
¼izFke i{kdkj ds gLrk{kj½
2- ------------------------------------------------------------------------------
-------------------------------------------------------------------------------
--------------------------------------------------------------------------------
¼uke o iwjk irk½
lkf{k;ksa dh mifLFkfr esa%
1- ------------------------------------------------------------------------------
-------------------------------------------------------------------------------
--------------------------------------------------------------------------------
¼uke o iwjk irk½
2- ------------------------------------------------------------------------------
-------------------------------------------------------------------------------
--------------------------------------------------------------------------------
¼uke o iwjk irk½
¼f}rh; i{kdkj ds gLrk{kj½
____________
[Autoritative English Test of this Department Notification No. STE-B(3)-1/2016 dated………. as
required under clause (3) of Article 348 of the Constitution of India].
ENVIRONMENT, SCENCE & TECHNOLOGY DEPARTMENT
NOTIFICATION
Shimla-171 002, the 1st November, 2017
No.STE-B(3)-1/2016.—In exercise of the powers conferred by proviso of article, 309 of the
Constitution of India, the Governor, Himachal Pradesh in consultation with the Himachal Pradesh
Public Service Commission, is pleased to make the Recruitment & Promotion Rules for the post of
Law Officer, Class-II (Gazetted) in the Department of Environment, Science & Technology,
Himachal Pradesh as per annexure-'A' attached to this notification, namely.—
8538
jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939
1.
Short title and commencement.—(1) These rules may be called the Himachal
Pradesh, Department of Environment, Science & Technology, Law Officer, Class-II (Gazetted)
recruitment and Promotion Rules, 2017.
(2) These rules shall come into force from the date of publication in the Rajpatra,
Himachal Pradesh.
By order,
Sd/-
Addl. Chief Secretary (Env., Sci. & Tech.).
_____________
ANNEXURE-A
RECRUITMENT AND PROMOTION RULES FOR THE POST OF LAW OFFICER,
CLASS-II (GAZETTED) IN THE DEPARTMENT OF ENVIRONMENT, SCIENCE &
TECHNOLOGY, HIMACHAL PRADESH
1.
Name of the Post.—Law Officer
2.
Number of Posts.—01 (One)
3.
Classification.—Class-II (Gazetted)
4.
Scale of Pay.—(i) Pay Band for regular incumbents:— ` 10300-34800+ ` 4400
Grade Pay.
(ii) Emoluments for contract employee:— `` 14,700/- as per details given in col.15-A.
5.
Whether ‘Selection’ Post or ‘Non-Selection’ post’.— Not Applicable
6.
Age for direct recruitment.—Between 18 to 45 years.
Provided that the upper age limit for direct recruits will not be applicable to the candidates
already in service of the Government including those who have been appointed on adhoc or on
contract basis:
Provided further that if a candidate appointed on adhoc basis or on contract basis had
become over-age on the date he/she was appointed as such he/she shall not be eligible for any
relaxation in the prescribed age-limit by virtue of his/her such adhoc or contract appointment:
Provided further that upper age-limit is relaxable for Scheduled Caste/Scheduled
Tribes/Other categories of persons to the extent permissible under the general or special order (s)
of the Himachal Pradesh Government:
Provided further that the employees of all the Public Sector Corporations and Autonomous
Bodies who happened to be Government servants before absorption in Public Sector
Corporations/Autonomous
Bodies
at
the
time
of
initial
constitutions
of
such
Corporations/Autonomous Bodies shall be allowed age concession in direct recruitment
as admissible to Government servants. This concession will not, however, be admissible to such
staff of the Public Sector Corporations/Corporations/Autonomous Bodies who were/are
8539
jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939
subsequently appointed by such Corporations/ Autonomous Bodies and who are/were finally
absorbed in the service of such Corporations/Autonomous Bodies after initial constitution of the
Public Sector Corporations/Autonomous Bodies.
Note:—Age limit for direct recruitment will be reckoned on the first day of the year in
which the post(s) is/are advertised for inviting applications or notified to the Employment
Exchanges, as the case may be.
7.
Minimum educational and other qualifications required for direct
recruit(s).—(a) Essential Qualification:—(i) Bachelor’s Degree in Law from a recognized
University.
(ii) Minimum 5 years experience in legal matters while working in a Government/
Semi Government Institution/ Agencies/NGOs/Private Sector etc.
(b) Desirable Qualification:—(i) Preference will be given to the candidates having
experience in Environmental Law and Litigation.
(ii) Knowledge of customs, manners & dialects of Himachal Pradesh and suitability for
appointment in the peculiar conditions prevailing in the Pradesh.
8.
Whether age and educational qualifications prescribed for direct recruits will
apply in the case of the promote(s) ?.—Age:— Not Applicable.
Educational Qualification:— Not Applicable.
9.
Period of probation, if any.—(a) Two years subject to such further extension for a
period not exceeding one year as may be ordered by the competent authority in special
circumstances and reasons to be recorded in writing.
(b) No probation in case of appointment on contract basis, tenure basis, re-employment
after superannuation and absorption.
10. Method
of
recruitment–whether
by
direct
recruitment
or
by
promotion/secondment/transf er and the percentage of post to be filled in by various
methods.—100% by direct recruitment on regular basis or by recruitment on contract
basis as the case may be.
11. In case of recruitment by promotion/secondment/ transfer, grade(s) from which
promotion/secondment, transfer is to be made.—Not Applicable.
12. If a Departmental Promotion Committee exists, what is its composition?.—( a)
Departmental Promotion Committee:—Not applicable
(b) Departmental Confirmation Committee:—As may be constituted by the Government
from time to time.
13.
Circumstances under which the Himachal Pradesh Public Service Commission
(HPPSC) is to be consulted in making recruitment.—As required under the law.
14. Essential requirement for a direct recruitment.—A candidate for appointment to
any service or post must be a citizen of India.
8540
jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939
15. Selection for appointment to the post by direct recruitment.—Selection for
appointment to the post in the case of direct recruitment shall be made on the basis of
interview/personality test, if the Himachal Pradesh Public Service Commission or other recruiting
agency/authority, as the case may be, so consider necessary or expedient on the basis of
interview/personality test preceded by a screening test (objectives type)/written test, practical test
or physical test, the standard/syllabus, etc. of which, will be determined by the
Commission/other recruiting agency/authority as the case may be.
15.A Selection for appointment to the post by Contract appointment.—
Notwithstanding anything contained in these rules, contract appointment to the post will be made
subject to the terms and conditions given below:
(I)
CONCEPT:—(a) Under this policy, the Law Officer in the Department of
Environment, Science & Technology, H.P. will be engaged on contract basis initially for one
year which may be extendable on year to year basis:
Provided that for extension/renewal of contract period on year to year basis the concerned
HOD shall issue a certificate that the service and conduct of the contract appointee is satisfactory
during the year and only then his period of contract is to be renewed/extended.
(b) POST
FALLS
WITHIN
THE
PURVIEW
OF
HP
PSC:—The
Pr.
Secretary/Secretary (Environment, Science & Technology) to the Govt. of H.P. after obtaining
the approval of the Government to fill up the vacant posts on contract basis will place the
requisition with the concerned recruiting agency i.e. Himachal Pradesh Public Service
Commission.
(c) The selection will be made in accordance with the eligibility conditions prescribed
in these rules.
(II) CONTRACTUAL EMOLUMENTS:—The Law Officer appointed on contract
basis will be paid consolidated fixed contractual amount @ ` 14,700/- P.M. (which shall be equal
to minimum of Pay band plus grade pay). An amount of ` 441/- (3% of the minimum of Pay band
+ Grade Pay of the post) as annual increase in contractual emoluments for the subsequent year(s)
will be allowed if contract is extended beyond one year.
(III) APPOINTING/DISCIPLIANRY
AUTHORITY:—The
Pr.
Secretary/Secretary
(Environment, Science & Technology) to the Govt. of H.P. will be appointing and disciplinary
authority.
(IV) SELECTION PROCESS:—Selection for appointment to the post in the case of
Contract Appointment will be made on the basis of interview/personality test or if considered
necessary or expedient on the basis of interview/personality test preceded by a screening test
(objective test)/written test or practical test or physical test, the standard syllabus etc. of which
will be determined by the concerned recruitment agency i.e. Himachal Pradesh Public Service
Commission.
(V) COMMITTEE FOR SELECTION OF CONTRACTUAL APPOINTMENTS:—
As may be constituted by the concerned recruiting agency i.e. the Himachal Pradesh
Public Service Commission from time to time.
(VI) AGREEMENT:—After selection of a candidate he/she shall sign an agreement as
per “Annexure-B” appended to these rules.
8541
jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939
(VIII) TERMS AND CONDITIONS:—(a) The Contractual appointee will be paid fixed
contractual amount @ ` 14,700/- per month (which shall be equal to minimum of Pay band plus
Grade pay). The Contract Appointee will be entitled for increase in contractual amount @ ` 441/-
(3% of the minimum of Pay band + grade Pay of the post) for further extended years and no
other allied benefits such as senior/selection scales etc. will be given.
(b) The service of the Contract Appointee will be purely on temporary basis. The
appointment is liable to be terminated in case the performance/ conduct of the contract appointee
is not found satisfactory.
(c) The contract appointee will be entitled for one day’s casual leave after putting one
month service. However, the contract employee will also be entitled for 135 days Maternity
Leave, 10 days Medical Leave and 5 days special leave. A female contract appointee shall also
be entitled for maternity leave not exceeding 45 days (irrespective of the number of surviving
children) during the entire service, in case of miscarriage including abortion, on production of
medical certificate issued by the authorized Government Medical Officer. He/she shall not be
entitled for Medical re- imbursement and LTC etc. No leave of any other kind except above is
admissible to the contract appointee:
Provided that the un-availed Casual Leave and Medical Leave and Special Leave can be
accumulated up to the Calendar Year and will not be carried forward for the next Calendar Year.
(d) Unauthorized absence from the duty without the approval of the controlling officer
shall automatically lead to the termination of the contract. However, in exceptional cases where
the circumstances for un- authorized absence from duty were beyond his/her control on medical
grounds, such period shall not be excluded while considering his/her case for regularization but
the incumbent shall have to intimate the controlling authority in this regard well in time.
However, the contract appointee shall not be entitled for contractual amount for this period of
absence from duty.
Provided that he/she shall submit the certificate of illness/fitness issued by the Medical
Officer, as per prevailing instructions of the Government.
(e) An official appointed on contract basis who has completed three years tenure at one
place of posting will be eligible for transfer on need based basis wherever required on
administrative grounds.
(f)
Selected candidate will have to submit a certificate of his/her fitness from a
Government/ Registered Medical Practitioner. Women candidate pregnant beyond 12 weeks will
stand temporarily unfit till the confinement is over. The women candidate will be re-examined
for the fitness from an authorized Medical Officer/Practitioner.
(g) Contract appointee will be entitled to TA/DA if required to go on tour in connection
with his/her official duties at the same rate as applicable to regular counterpart officials at the
minimum of pay scale;
(h) Provisions of service rules like FR SR, Leave Rules, GPF Rules, Pension Rules &
Conduct Rules etc. as are applicable in case of regular employees will not be applicable in case
of contract appointees. Employees Group Insurance Scheme as well as EPF/GPF will also not
be applicable to contract appointee(s).
16. Reservation.—The appointment to the service shall be subject to orders regarding
reservation in the service for Scheduled Castes/Scheduled Tribes/Other Backward Classes/Other
categories of persons issued by the Himachal Pradesh Government from time to time.
8542
jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939
17. Departmental Examination.—Every member of the Service shall pass a
Departmental Examination as prescribed in the H.P Departmental Examination Rule,1997
as amended from time to time.
18.
Powers to relax.—Where the State Government is of the opinion that it is
necessary or expedient to do so, it may, by order for reasons to be recorded in writing and in
consultation with the Himachal Pradesh Public Service Commission relax any of the
provision(s) of these rules with respect to any class or category of person(s) or post(s).
____________
ANNEXURE –B
FORM OF CONTRACT/AGREEMENT TO BE EXECUTED BETWEEN THE LAW
OFFICER AND THE GOVERNMENT OF HIMACHAL PRADESH THROUGH THE
PR. SECRETARY/SECRETARY (ENVIRONMENT, SCIENCE & TECHNOLOGY) TO
THE GOVT. OF HIMACHAL PRADESH.
This agreement is made on this………..….day of….………….………in the year
………………….……..between Sh./Smt…………….………. S/o/D/o …………………………….
R/o………………. ……… contract appointee, (hereinafter called the FIRST PARTY) AND the
Governor of Himachal Pradesh through Pr. Secretary/Secretary (Environment, Science &
Technology) to the Govt. of Himachal Pradesh (hereinafter “SECOND PARTY”).
Whereas, the SECOND PARTY has engaged the aforesaid FIRST PARTY and the FIRST
PARTY has agreed to serve as a Law Officer on contract basis on the following terms and
conditions:—
1.
That the FIRST PARTY shall remain in the service of the SECOND PARTY as a Law
Officer for a period of one year commencing on day of ………………….and
ending on the day of …………………It is specifically mentioned and agreed upon
by both the parties that the contract of the FIRST PARTY with SECOND PARTY
shall ipso-facto stand terminated on the last working day i.e. on ………and
information notice shall not be necessary:
Provided that for further extension/ renewal of contract period the HOD shall
issue a certificate that the service and conduct of the contract appointee was
satisfactory during the year and only then the period of contract is to be renewed/
extended.
2.
That the contractual amount of the FIRST PARTY will be K14,700/- per month.
3.
That the services of FIRST PARTY will be purely on temporary basis. The
appointment is liable to be terminated in case the performance/ conduct of the
contract appointee is not found satisfactory.
4.
The Contractual appointee will be entitled for one day’s casual leave after putting
one month service. However, the contract employee will also be entitled for 135
days Maternity Leave, 10 days Medical Leave and 5 days special leave. A female
contract appointee shall also be entitled for maternity leave not exceeding 45 days
(irrespective of the number of surviving children) during the entire service, in case
of miscarriage including abortion, on production of medical certificate issued by the
8543
jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939
authorized Government Medical Officer. He/she shall not be entitled for Medical Re-
imbursement and LTC etc. No leave of any other kind except above is admissible to
the contract appointee:
Provided that the un-availed Casual Leave and Medical Leave can be accumulated up
to the Calendar Year and will not be carried forward for the next Calendar Year.
5.
Unauthorized absence from the duty without the approval of the controlling officer
shall automatically lead to the termination of the contract. However, in exceptional
cases where the circumstances for un-authorized absence from duty were beyond
his/her control on medical grounds, such period shall not be excluded while
considering his/her case for regularization but the incumbent shall have to intimate
the controlling authority in this regard well in time. However, the contract appointee
shall not be entitled for contractual amount for this period of absence from duty:
Provided that he/she shall submit the certificate of illness/fitness issued by the
Medical Officer, as per prevailing instructions of the Government:
6.
An official appointed on contract basis who have completed three years tenure at
one place of posting will be eligible for transfer on need based basis wherever
required on administrative grounds.
7.
That selected candidate will have to submit a certificate of his/her fitness from a
Government/Registered Medical Practitioner. In case woman candidate pregnant
beyond twelve (12) weeks will stand temporarily unfit till the confinement is over.
The woman candidate shall be re-examined for the fitness from an authorized
Medical Officer/Practitioner.
8.
That contract appointee shall be entitled to TA/DA if required to go on tour in
connection with his/her official duties at the same rate as applicable to regular counter-
part officials at the minimum of pay scale.
9.
That the Employees Group Insurance Scheme as well as EPF/GPF will not be
applicable to contractual appointee(s).
IN WITNESS the FIRST PARTY AND SECOND PARTY have herein to set their
hands the day, month and year first above written.
IN THE PRESENCE OF WITNESSES :
1. …………………………..
. ………………………….
(Name and full address ) Signature of the FIRST PARTY
2.
………………………..
…………………………..
(Name and full address )
Signature of the SECOND PARTY
8544
jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939
ENVIRONMENT, SCIENCE & TECHNOLOGY DEPARTMENT
NOTIFICATION
Dated: 07th November, 2017
No. STE-E(3)-10/2017-Pt-I.—In pursuance of the notification of Wetlands (Conservation
and Management) Rules, 2017 by Ministry of Environment, Forest & Climate Change,
Government of India, dated 26-09-2017, the Governor, Himachal Pradesh is pleased to constitute
Himachal Pradesh State Wetlands Authority(HPSWA) under the Conservation and
Management of Wetlands as defined in Rule 5 sub rule (1) of the Wetlands (Conservation and
Management) Rules, 2017 as under:
1.
The State Government hereby constitutes the State Wetlands Authority with the
following members, namely:—
(i)
Minister In-charge of the Department of Environment, Science and Technology –
Chairperson;
(ii)
Chief Secretary to the Govt. of H.P – Vice Chairperson;
(iii)
Additional Chief Secretary, Environment,Science & Technology,Govt.of H.P –
Member ex- officio;
(iv)
Secretary in-charge of the Department of Forest - Member ex-officio;
(v)
Secretary in-charge of the Department of Urban Development - Member ex-officio;
(vi)
Secretary in-charge of the Department of Rural Development - Member ex-officio;
(vii)
Secretary in-charge of the Department of Fisheries - Member ex-officio;
(viii) Secretary in-charge of the Department of Irrigation and Public Health - Member ex-
officio;
(ix)
Secretary in-charge of the Department of Tourism - Member ex-officio;
(x)
Secretary in-charge of the Department of Revenue - Member ex-officio;
(xi)
Incharge, State Remote Sensing Centre - Member ex-officio;
(xii)
Principal Chief Conservator Forests(HOFF)-Member ex-officio;
(xiii) Chief Wildlife Warden - Member ex-officio;
(xiv)
Member Secretary, State Biodiversity Board - Member ex-officio;
(xv)
Member Secretary, State Pollution Control Board - Member ex-officio;
(xvi)
Additional Principal Chief Conservator of Forests of the Regional Office of
Ministry of Environment, Forest and Climate Change - Member ex-officio;
8545
jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939
(xvii) Five non-official members to be nominated in due course in field of Ecology,
Landscape, Fisheries, Hydrology and socio- Economics
(xviii) Member Secretary/Joint Member Secretary, Himachal Pradesh Council for
Science, Technology and Environment (HIMCOSTE) – Member Secretary;
2.
The H.P.State Wetlands Authority shall exercise the powers and functions as
defined in the notification No. GSR 1203(E) of the Ministry of Environment, Forests and
Climate Change, Government of India, New Delhi.
3.
The H.P. State Council for Science Technology and Environment (HIMCOSTE), shall
provide all necessary support and act as nodal Department and Secretariat to the Authority.
4.
As per Rule 5 Sub Rule (6) of Wetland (Conservation & Management ) Rules 2017, the
Authority shall, within ninety days of these rules, shall constitute:—
(a) a technical committee to review brief documents, management plans and advise on
any technical matter referred by the Wetland Authority; and
(b) a grievance committee consisting of four members to provide a mechanism for
hearing and forwarding the grievances raised by public to the Authority;
5.
The Committees referred to in sub-rule (6) shall meet at least once in every quarter to
perform their functions.
6.
The Authority shall meet at least thrice in a year.
7.
The term of non-official members of the Authority nominated by State Government,
shall be for a period not exceeding three years.
The office of the Himachal Pradesh Council for Science, Technology & Environment
(HIMCOSTE), Vigyan Bhawan, Bemloe, Shimla-1 would function as the Secretariat of the
Himachal Pradesh State Wetlands Authority for Conservation and Management of the
Wetlands of the State.
By order,
Sd/-
Chief Secretary.
8546
jkti=] fgekpy izns'k] 02 fnlEcj] 2017@11 ekxZ'kh"kZ] 1939
fu;U=d] eqnz.k rFkk ys[ku lkexzh] fgekpy izns'k] f'keyk&5 }kjk eqfnzr rFkk izdkf'kr
bysDVªkWfud gLrk{kfjr jkti=] oSclkbV http://rajpatrahimachal.nic.in ij miyC/k gS ,oe~ vkWuykbu lR;kfir fd;k tk ldrk gS