jkti=] fgekpy izns'k
fgekpy izns'k jkT; 'kklu }kjk izdkf'kr
'kfuokj] 21 tqykbZ] 2018@30 vk"kk<+] 1940
fgekpy izns'k ljdkj
PANCHAYATI RAJ DEPARTMENT
NOTIFICATION
Dated, the 18th July, 2018
No. PCH-HC(10)11/2018-19-Unopposed-GP-I.—Whereas, the Department of Panchayati
Raj has been providing funds for construction of Panchayat Ghar(s) to various Gram Panchayats;
85&jkti=@2018&21&07&2018
¼3449½
3450
jkti=] fgekpy izns'k] 21 tqykbZ] 2018@30 vk"kk<+] 1940
And whereas, various community activities such as meetings of Gram Sabha, Mahila
Mandals,Yuvak Mandals etc. are undertaken in these Panchayat Ghars as such these Panchayat
Ghar is a community building for all intends and purposes.
Therefore, the Governor of Himachal Pradesh is pleased to order the change of the name of
Panchayat Ghar to Panchayat Community Centre with immediate effect, and the funds will be
sanctioned by the Panchayati Raj Department in the name of Panchayat Community Centre in place
of Panchayat Ghar henceforth.
By order,
Sd/-
Secretary (PR).
__________
HIMACHAL PRADESH ELECTRICITY REGULATORY COMMISSION, SHIMLA
NOTIFICATION
Shimla, the 17th July, 2018
No. HPERC-Grid Code(388).—In exercise of the powers conferred under sub-section
(1)(h) of Section 86, sub-section (2) (zp) of Section 181 of the Electricity Act, 2003 (36 of 2003),
read with Section 21 of the General Clauses Act, 1897 (10 of 1897), and all other powers enabling
it in this behalf, the Himachal Pradesh Electricity Regulatory Commission proposes the following
draft amendment of Himachal Pradesh Electricity Grid Code, 2008 (hereafter referred to as “the
said code”) published in the Rajpatra, Himachal Pradesh, dated 11th May, 2008 and notice is
hereby given that the said draft amendment regulations will be taken into consideration after the
expiry of twenty one (21) days from the date of their publication in the Rajpatra, Himachal Pradesh,
together with any objections or suggestions which may within the aforesaid period be received in
respect thereto.
The text of proposed amendment is also available on the Commission's website i.e.
http.//www.hperc.org.
The objections and suggestions in this behalf should be addressed to the Secretary,
Himachal Pradesh Electricity Regulatory Commission, Vidyut Aayog Bhawan, Block No. 37, SDA
Complex, Kasumpti, Shimla-171009.
DRAFT REGULATIONS
1. Short title and commencement.— (1) These regulations may be called the Himachal
Pradesh Electricity Grid Code (First Amendment) Regulations, 2018.
(2) These regulations shall come into force from the date of their publication in the
Rajpatra, Himachal Pradesh.
2. In Chapter-1 of the said Code—
(I) for the existing sub-para 1.3.1 of para 1.3, the following shall be substituted,
namely :—
“This Code shall apply to all parties that connect with and/or utilize the IaSTS,
including SLDC, which are required to abide by the principles and procedures
3451
jkti=] fgekpy izns'k] 21 tqykbZ] 2018@30 vk"kk<+] 1940
defined in this Code to the extent it applies to them and, where the context so
permits, shall also apply to those connected to and/or using such component(s) of
the State Power Grid as may not form part of IaSTS.”;
(II) in the existing sub-para 1.3.2 of para 1.3, the word “transmission” shall be substituted
with the word “flow” ;
(III) for the existing clause (d) under sub-para 1.4.1 of para 1.4, the following shall be
substituted, namely :—
“This Chapter specifies the minimum technical and design criteria which shall be
complied with by STU and any User connected to, or seeking connection to the
IaSTS. This chapter also sets out the procedures by which STU shall ensure
compliance by all Users with the above criteria as a pre-requisite for the
establishment of an agreed connection.”;
(IV) for the existing para 1.6, including sub-para 1.6.1, 1.6.2 and 1.6.3 thereunder, the
following shall be substituted, namely :—
“1.6 Restricted Governor Mode of Operation 1.6.1 All thermal and hydro (except
those upto three hours pondage) generating units shall operate under
Restricted governor mode of operation with effect from 01-04-2019.
1.6.2 Any exemption from the above, other than that already provided for in
Chapter-5, may be granted only by the Commission for which the concerned
agency shall file a petition in advance.”;
(V) in sub-para (1.9.1) of para 1.9—
(i) after the existing definition of “Act”, the following new definition shall be
inserted, namely :—
Area Load
Despatch Centre
(ALDC)
A Load Despatch Centre established by the
distribution licensee operating in the State to
carry out the relevant operating directives issued
by SLDC to the distribution licensee and to assist
SLDC for safe and integrated operation of the
concerned network.
(ii) after the existing definition of “BIS”, the following new definition shall be
inserted, namely :—
Bulk Consumer
Any consumer who avails supply at 33 kV or
above.
3452
jkti=] fgekpy izns'k] 21 tqykbZ] 2018@30 vk"kk<+] 1940
(iii) after the existing definition of “Disturbance Recorder (DR)”, the following new
definition shall be inserted, namely :—
Distribution Licensee
A licensee authorized under section 14 of the Act
to operate and maintain a distribution system for
supplying electricity to the consumers in his area
of supply. At present 'Himachal Pradesh State
Electricity Board Limited (HPSEBL)' is the
distribution licensee in the State.
(iv) for the existing definition of “State Energy Account”, the following shall be
substituted, namely :—
“An Account, in terms of the energy quantum as well as the amounts
payable/receivable by various State Entities for the billing and settlement of
various charges, to be prepared by SLDC on the basis of transactions during
the period to which such account relates.”;
(v) after the existing definition of “State Energy Account”, the following new
definitions shall be inserted, namely :—
State Entity
Such person who is in the SLDC control area and
whose metering and energy accounting is done at
the state level and as described in more detail in
sub-para 6.5.5 of para 6.5 under Chapter-6 of this
Code.
State Power Grid
The Intra-State Transmission System/ network
owned by the State Transmission Utility
(STU)/Transmission Licensee(s) and/or the EHV/
33 kV Distribution System/network owned by the
distribution licensee(s) within the State.
(vi) for the existing definition of “State Pool Account”, the following shall be
substituted, namely :—
“The account which shall be opened, maintained and operated by the SLDC
for receiving/making payments on account of Charges for Deviation,
Additional Charges for Deviation, and interest if any, based on the weekly
deviation statements to be prepared by SLDC in accordance with the
provisions of Himachal Pradesh Electricity Regulatory Commission
(Deviation Settlement Mechanism and related matters) Regulations, 2018.”;
(vii) for the existing definition of “State Sector Generating Stations (SSGS)”, the
following shall be substituted, namely :—
“Generating Stations connected with the State Power Grid including IPP,
Captive Generating Plant, Co-Generators and NCES. However for the
purpose of scheduling /despatching the provisions made in Chapter-6 shall
be applicable.”;
3453
jkti=] fgekpy izns'k] 21 tqykbZ] 2018@30 vk"kk<+] 1940
(viii) in the existing definition of “Time Block” —
(a) for the sign “.”, the sign “:” shall be substituted; and
(b) the following proviso shall be added, namely :—
“Provided that the Commission may revise the duration of time block to 5
minutes, or any other duration, from the date to be notified by it from time to
time.”;
(ix) for the existing definition of the term “Transmission Licensee”, the following
shall be substituted, namely :—
“A licensee authorized under section 14 of the Act to establish or operate
transmission lines. At present 'Himachal Pradesh Power Transmission
Corporation Limited (HPPTCL)' is transmission licensee in the State.”; and
(x) for the existing definition of the item “User”, the following shall be substituted,
namely :—
“A term used in various sections of HPEGC to refer to the person/agencies
using the IaSTS and shall also include distribution licensee and /or any other
person/agency not using IaSTS but using any other component of State
Power Grid, as the context may require and as more particularly identified in
each section of HPEGC.”
3. In Chapter-2 of the said Code—
for the existing item (f) in sub-para 2.6.3 of para 2.6, the following shall be substituted,
namely :—
“(f) Operation of State Deviation Pool Account and State reactive energy account.”
4. In Chapter–3 of the said Code—
for the sub-para 3.7.2 of para 3.7, the following shall be substituted, namely :—
“3.7.2 Users shall mean any person/agency using IaSTS (or intending to use IaSTS) and
shall also include a person/agency using the ISTS(or intending to use the ISTS)
through their lines (or otherwise) erected or to be erected in State of Himachal
Pradesh.”
5. In Chapter-4 of the said Code—
(i) after clause (a)(iii) of sub-para 4.7.2 of para 4.7, the following new item shall be
added, namely :—
3454
jkti=] fgekpy izns'k] 21 tqykbZ] 2018@30 vk"kk<+] 1940
“(iv) 400 milli seconds (ms) for 33 kV.” ;
(ii) for the existing sub-para 4.8.4 of para 4.8, the following shall be substituted,
namely:—
“4.8.4All thermal generating units of 200 MW and above, open cycle gas
turbine/combined cycle generating stations having gas turbines of more than
50 MW each and all hydro units of 25 MW and above operating at or above
100% of their Maximum Continuous Rating (MCR) shall have the capability
of (and shall not in any way be prevented from) instantaneously picking up
to 105%, 105% and 110% of their MCR, respectively, when the Grid
frequency falls suddenly. After an increase in generation as above, a
generating unit may ramp back to the original level at a rate of about one
percent (1%) per minute, in case continued operation at the increased level is
not sustainable. Any generating unit not complying with the above
requirements shall be kept in operation (synchronized with grid) only after
obtaining permission from SLDC.”;
(iii) for the existing sub-para (4.10.1) of para 4.10, the following shall be substituted,
namely :—
“4.10.1 Reliable and efficient speech and data communication systems shall be
provided to facilitate necessary communication and data exchange and
supervision/control of the grid by the SLDC, under normal and abnormal
conditions. All Users, including generating stations not falling under the
definition of State Entity, shall provide systems to telemeter power system
parameter such as power flow, voltage and status of switches/transformer
taps etc. in line with interface requirements and other guideline made
available to SLDC. The associated communication system to facilitate data
flow up to SLDC, shall also be established by the concerned User as
specified by STU in connection agreement. All Users in coordination with
STU shall provide the required facilities at their respective ends and SLDC
as specified in the connection agreement.”;
(iv) for the sub-para (4.17.1) of para 4.17, the following shall be substituted,
namely :—
“4.17.1 STU shall submit annually to the Commission by 30th September each
year schedule of such transmission assets, indicating ownership also, in
electronic form, which constitute a part of State Power Grid as on 31st
March of that year and on which SLDC has operational control and
responsibility.”;
(v) after para 4.17, the following new para shall be added, namely :—
“4.18 Cyber Security
4.18.1 All Intrastate Utilities shall have in place, a cyber security framework to
identify the critical cyber assets and protect them so as to support reliable
operation of grid.”
3455
jkti=] fgekpy izns'k] 21 tqykbZ] 2018@30 vk"kk<+] 1940
6. In Chapter–5 of the said Code—
(I) for the existing sub-para 5.3.6 of para 5.3, the following shall be substituted,
namely :—
“5.3.6 All thermal generating units of 200 MW and above and all hydro units of 25
MW and above, which are synchronized with the grid, irrespective of their
ownership, shall have their governors in operation at all times in accordance with
the following provisions; namely :—
(i) all the Thermal generating units having capacity 50 MW and above and
Hydro (except those upto three hours pondage) generating units having
capacity 25 MW and above shall be operated under Restricted Governor
Mode of Operation with effect from 01-04-2019;
(ii) the restricted governor mode of operation shall essentially have the following
features :—
(a) there should not be any reduction in generation in case of improvement
in grid frequency below 50.05 HZ (for example, if grid frequency
changes from 49.9 to 49.95 Hz, there shall not be any reduction in
generation). For any fall in grid frequency, generation from the unit
should increase by 5% limited to 105% of the MCR of the unit subject
to machine capability;
(b) ripple filter of +/-0.03 Hz shall be provided so that small changes in
frequency are ignored for load correction, in order to prevent governor
hunting;
(c) if any of these generating units is required to be operated without its
governor in operation as specified above, the SLDC shall be
immediately apprised about the reason and duration of such operations.
All governor shall have a droop setting of between 3% and 6%; and
(d) after stabilization of frequency around 50Hz , the SERC may review the
above provision regarding the restricted governor mode of operation
and free governor mode of operation may be introduced;
(iii) all other generating units including hydro having the pondage upto 3 hours,
Gas turbine/Combined Cycle Power Plants, wind, solar generators and
nuclear power station shall be exempted from the provisions of clauses (i)
and (ii) of this para as well as of sub-paras 5.3.7, 5.3.8 and 5.3.9 till the
commission review the situation :
Provided that if a generating unit cannot be operated under restricted
governor mode operation, then it shall be operated in free governor mode
operation with manual intervention to operate in the manner required under
restricted governor mode operation.”;
3456
jkti=] fgekpy izns'k] 21 tqykbZ] 2018@30 vk"kk<+] 1940
(II) for the existing sub-para 5.3.7 of para 5.3, the following shall be substituted,
namely :—
“5.3.7 Facilities available with/in load limiters, Automatic Turbine Run-up
System (ATRS), Turbine supervisory control, coordinated control system,
etc., shall not be used to suppress the normal governor action in any manner.
No dead bands and/or time delays shall be deliberately introduced :
Provided that periodic checkups by third party should be conducted at
regular intervals at least once in two years through independent agencies
selected by SLDC. The cost of such tests shall be recovered by the SLDC
from the Generators. If deemed necessary by SLDC, the test may be
conducted more than once in two years.”;
(III) for the existing sub-para 5.3.8 of para 5.3, the following shall be substituted,
namely :—
“5.3.8 All thermal generating units of 200 MW and above and all hydro units of
25MW and above operating at or up to 100% of their Maximum Continuous
Rating (MCR) shall normally be capable of (and shall not in any way be
prevented from) instantaneously picking up to 105% and 110% of their
MCR, respectively, when frequency falls suddenly. After an increase in
generation as above, a generating unit may ramp back to the original level at
a rate of about one percent (1%) per minute, in case continued operation at
the increased level is not sustainable. Any generating unit not complying
with the above requirements shall be kept in operation (synchronized with
the grid) only after obtaining the permission of SLDC. For the purpose of
ensuring primary response, SLDC shall not schedule the generating station
or unit(s) thereof beyond ex bus generation corresponding to 100% of the
Installed capacity of the generating station or unit(s) thereof. The generating
station shall not resort to Valve Wide Open (VWO) operation of units
whether running on full load or part load, and shall ensure that there is
margin available for providing Governor action as primary response. In case
of gas/liquid fuel based units, suitable adjustment in Installed Capacity
should be made by SLDC for scheduling in due consideration of prevailing
ambient conditions of the temperature and pressure vis-à-vis site ambient
conditions on which installed capacity of the generating station or unit(s)
thereof have been specified :
Provided that scheduling of hydro stations shall not be reduced during high
inflow period in order to avoid spillage:
Provided further that the VWO margin shall not be used by SLDC to
schedule Ancillary Services.”;
(IV) for the existing sub-para 5.3.9 of para 5.3, the following shall be substituted,
namely :—
“5.3.9 The recommended rate for changing the governor setting, i.e.,
supplementary control for increasing or decreasing the output (generation
level) for all generating units, irrespective of their type and size, would be
one (1.0) percent per minute or as per manufacturer's limits.”;
3457
jkti=] fgekpy izns'k] 21 tqykbZ] 2018@30 vk"kk<+] 1940
(V) in the existing sub-para 5.3.10 of para 5.3, the following shall be substituted,
namely :—
“5.3.10 Except under an emergency, or to prevent an imminent damage to a costly
equipment, no User shall suddenly reduce his generating unit output by more
than 20% of installed capacity or 10MW whichever is less without prior
intimation to and consent of the SLDC. Similarly, no User shall cause a
sudden variation in its load by more than 20% or 10MW whichever is less
without prior intimation to and consent of the SLDC. All users shall ensure
that temporary over voltage due to sudden load rejection and the maximum
permissible values of voltage unbalance shall remain within limits specified
under Central Electricity Authority (Grid Standards) Regulations, 2010.”;
(VI) for the existing sub-para 5.3.12 of para 5.3, the following shall be substituted,
namely :—
“5.3.12 Provision of protections and relay settings shall be coordinated
periodically throughout the State Power Grid, as per the plan to be separately
finalized by the STU in coordination with all Users and the RPC, wherever
required. The STU shall also prepare islanding schemes and ensure its
implementation in accordance with Central Electricity Authority (Grid
Standards) Regulations, 2010. All users shall ensure that installation and
operation of protection system shall comply with the provisions of Central
Electricity Authority (Grid Standards) Regulations, 2010.”;
(VII) for the existing sub-para 5.3.13 of para 5.3, the following shall be substituted,
namely :—
“5.3.13 All Users and SLDC, shall take all possible measures to ensure that the
grid frequency always remains within the 49.90–50.05 Hz band or as may be
specified in IEGC from time to time.”;
(VIII) for the existing sub-para 5.3.19 of para 5.3, the following shall be substituted,
namely :—
“5.3.19 All Users shall make all possible efforts to ensure that the grid voltage
always remains within the following operating range :—
Voltage-(kv rms)
Nominal
Maximum
Minimum
400
420
380
220
245
198
132
145
122
66
72
60
33
36
30
(IX) for the existing sub-para 5.5.2 of para 5.5, the following shall be substituted,
namely :—
“5.5.2 Demand Management Process
(a) All users /SLDC shall initiate action to restrict the drawal of their respective
control area, from the grid, within the net drawal schedule;
3458
jkti=] fgekpy izns'k] 21 tqykbZ] 2018@30 vk"kk<+] 1940
(b) All users /SLDC shall ensure that requisite load shedding is carried out in its
control area so that there is no overdrawl;
(c) Each User/STU/SLDC shall formulate contingency procedures and make
arrangements that will enable demand disconnection to take place, as
instructed by the SLDC, under normal and/or contingent conditions. These
contingency procedures and arrangements shall regularly be/updated by
User/STU and monitored by SLDC. SLDC may direct any User/STU to
modify the above procedures/arrangement, if required, in the interest of grid
security and the concerned User/STU shall abide by these directions;
(d) The SLDC shall also, through the distribution licensee, formulate and
implement state-of-the-art demand management schemes for automatic
demand management like rotational load shedding, demand response (which
may include lower tariff for interruptible loads) etc., to reduce overdrawl in
order to comply with items (a) and (b) of this sub-para 5.5.2. A Report
detailing the scheme and periodic reports on progress of implementation of
the schemes shall be sent to the State/Central Commission by the concerned
SLDC;
(e) In order to maintain the frequency within the stipulated band and
maintaining the network security, the interruptible loads shall be arranged in
four groups of loads, for scheduled power cuts/load shedding, loads for
unscheduled load shedding, loads to be shed through under frequency relays/
df/dt relays and loads to be shed under any System Protection Scheme
identified at the RPC level. These loads shall be grouped in such a manner,
that there is no overlapping between different Groups of loads. In case of
certain contingencies and/or threat to system security, if the RLDC directs
SLDC/distribution licensee or Open Access Consumers connected to the
ISTS to decrease drawal of its control area by a certain quantum, such
directions shall immediately be acted upon. SLDC shall send compliance
report immediately after compliance of these directions to RLDC;
(f) To comply with the direction of RLDC, SLDC may direct any distribution
licensee/Open Access Consumers connected to the STU to curtail drawal
from grid. SLDC shall monitor the action taken by the concerned entity and
ensure the reduction of drawal from the grid as directed by RLDC;
(g) SLDC shall devise standard instantaneous message formats in order to give
directions in case of contingencies and/or threat to the system security to
reduce deviation from schedule by the bulk consumer/Open Access
Consumer, State Utility/ SSGS/ Intrastate Entity/Injecting Utility at different
overdrawal/underdrawal/over-injection/under-injection conditions depending
upon the severity. The Intrastate entities shall ensure immediate compliance
with these directions of SLDC and send a compliance report to the SLDC. In
case of severe contingencies and/or threat to the system security, the SLDC
may issue suitable instructions, under intimation to the concerned State
Entity, directly to any generating stations or bulk consumer who does not fall
under the definition of user but is otherwise connected to State Power Grid
and in such an event, such concerned generating station /bulk consumer shall
comply with such instructions and shall send a compliance report to the
SLDC;
3459
jkti=] fgekpy izns'k] 21 tqykbZ] 2018@30 vk"kk<+] 1940
(h) All State Entities/Users shall comply with direction of SLDC and carry out
requisite load shedding or backing down of generation in case of congestion
in transmission system to ensure safety and reliability of the system. The
procedure for application of measures to relieve congestion in real time as
well as provisions of withdrawl of congestion shall be in accordance with
Central Electricity Regulatory Commission (Measures to relieve congestion
in real time operation) Regulations, 2009. The measures taken by the Users,
SLDC /distribution licensee or bulk consumer/Open Access Consumers shall
not be withdrawn as long as the frequency remains at a level lower than the
limits specified in para 5.3 or congestion continues, unless specifically
permitted by the SLDC.”;
(X) In sub-para 5.6.1 of para 5.6, for the existing items (d) and (e), the following
shall be substituted , namely :—
“(d) Transmission Constraints ;
(e) Instances of persistent /significant non-compliance of HPEGC;
(f) Instances of congestion in transmission system;
(g) Instances of inordinate delays in restoration of transmission elements and
generating units; and
(h) Non-compliance of instructions of SLDC by distribution licensees/bulk
consumers/Open Access Consumers, to curtail drawal resulting in non-
compliance of HPEGC.”;
(XI) after sub-para 5.6.1 of para 5.6, the following new sub-para shall be added,
namely :—
“5.6.1A A daily report covering the performance of the State Power Grid shall be
prepared by each SLDC based on the inputs received from Users and shall be
put on its website. This report shall also cover the wind and solar power
generation and injection into the grid.”;
(XII) in sub-para 5.7.2 of para 5.7, after clause (a)(ii), the following new clause shall
be added, namely :—
“(iii) All operational instructions given by SLDC shall have unique codes which
shall be recorded and maintained as per Central Electricity Authority (Grid
Standards) Regulations, 2010.”;
(XIII) in para 5.9(b), at same para, the following shall be added, namely :—
“Diesel Generator sets for black start would be tested on weekly basis and test
report shall be sent to SLDC on quarterly basis.”; and
(XIV) in sub-para 5.10.5 of para 5.10, after item (viii), the following new clause shall
be added, namely :—
“(ix) Sudden load rejection by any User”.
3460
jkti=] fgekpy izns'k] 21 tqykbZ] 2018@30 vk"kk<+] 1940
7. In Chapter–6 of the said Code—
(I) for the existing clause (d) of sub-para 6.1.1 of para 6.1, the following shall be
substituted, namely :—
“(d) Complementary commercial mechanisms (in Annexure–1).”;
(II) for the existing para 6.2, the following shall be substituted, namely: —
“6.2 The objective of this Code is to specify the procedures to be adopted for
scheduling of despatches from the SSGS and imports from ISGS and BBMB
Generating Stations or any other person and net drawals by the beneficiaries
on a daily basis and also the modality of the flow of information between the
SLDC, RLDC, SSGS and the beneficiaries of the State. The procedure for
submission of capability declaration by each SSGS and submission of drawal
schedule by each beneficiary is intended to enable SLDC to prepare the
despatch schedule for each SSGS and drawal schedule for each beneficiary.
It also provides methodology of issuing real time despatch/drawal
instructions and rescheduling, if required, to SSGS and beneficiaries along
with the commercial arrangement for the deviations from schedules, as well
as, mechanism for reactive power pricing. This code also provides that
suitable energy meters shall be provided for accounting of charges for
deviation under Himachal Pradesh Electricity Regulatory Commission
(Deviation Settlement Mechanism and related matters) Regulations, 2018.
Telemetry/ communication system and Data Acquisition system shall also be
provided for transfer of information to the ALDC and SLDC. The provisions
contained in this chapter are without prejudice to the powers conferred on
SLDC under section 32 and 33 of the Electricity Act, 2003.”;
(III) after para 6.3, the following new para shall be added, namely :—
“ 6.3 A Definitions
(a) “State Entity” means such person who is in the SLDC control area and
whose metering and energy accounting is done at the State level.
Explanation.—The sellers selling power to a person forming State Entity,
including distribution licensee, on regular basis shall not be considered as separate
State Entity in relation to such sale of power under regular arrangement and the
availability of power from the such sources shall be accounted for by the State
Entity purchasing such power for all intents and purposes. However, in case only
a part of the total energy sales by a seller is being sold under regular arrangement
and balance part is sold to any other person, not forming a State Entity of the
State, such seller shall be considered as a separate State Entity in relation to sale
of such balance portion. Accordingly the generating stations selling the entire
saleable energy to the distribution licensee shall not be treated as State Entities for
the purpose of scheduling and despatching etc.”
(b) “State Sector Generating Stations (SSGS)” means generating stations
connected with the State Power Grid. However, for the purpose of scheduling /
dispatching such generating stations as are selling entire saleable energy to the
destribution licensee and are not considered as separate State Entities, shall not be
3461
jkti=] fgekpy izns'k] 21 tqykbZ] 2018@30 vk"kk<+] 1940
considered as SSGS. Such generating stations shall submit their projections/
estimates and other online and offline data as may be required by ALDC so as to
enable the ALDC to prepare consolidated schedule of the distribution licensee and
also to keep SLDC updated on the information relating to the distribution
licensee, including such generating stations.”;
(IV) in the existing sub-para 6.4.1 of para 6.4, for the existing clause (g), the following shall
be substituted, namely :—
“(g) Implementation of Himachal Pradesh Electricity Regulatory Commission
(Deviation Settlement Mechanism and related matters) Regulations, 2018;
(h) Free governor operation at generating stations wherever possible; and
(i) Regulating the net drawal of their control area from the regional grid in
accordance with the respective regulations.”;
(V) for the existing sub-para 6.4.2 of para 6.4, the following shall be substituted,
namely:—
“6.4.2 The system of each intra state entity shall be treated and operated as notional
control area. The algebraic summation of scheduled drawal from ISGS and from
contracts through longterm access, medium-term open access arrangements shall
provide the drawal schedule of each State Entity, and this shall be determined in
advance on day-ahead basis. The State Entities shall regulate their generation
and/or load so as to maintain their actual drawal from the regional grid close to
the above schedule. Maximum inadvertent deviation allowed during a time block
shall not exceed the limits specified in the Himachal Pradesh Electricity
Regulatory Commission (Deviation Settlement Mechanism and related matters)
Regulations, 2018. Such deviations should not cause system parameters to
deteriorate beyond permissible limits and should not lead to unacceptable line
loadings. Inadvertent deviations, if any, from net drawal schedule shall be priced
through the Himachal Pradesh Electricity Regulatory Commission (Deviation
Settlement Mechanism and related matters) Regulations, 2018. Every regional
entity shall ensure reversal of sign of deviation from schedule at least one after
every twelve time block.
The SLDC shall always restrict the net drawal of the State from the grid within
the drawal schedules and keeping the deviations from the schedule within the
limits specified in the relevant regulations. The concerned distribution
licensee/User and SLDC shall ensure that the automatic demand management
scheme mentioned in clause 5.5.2 acts to ensure that there is no over-drawal. If
the automatic demand management scheme has not yet been commissioned, then
action shall be taken as per manual demand management scheme to restrict the
net drawal form grid to within schedules and all actions for early commissioning
of Automatic Demand Management Scheme (ADMS) shall be initiated.”;
(VI) for the existing sub-para 6.4.5 of para 6.4, the following shall be substituted,
namely :—
“6.4.5 The SSGS is normally expected to generate power according to the daily
schedules advised to them barring any inadvertent deviations. Maximum
3462
jkti=] fgekpy izns'k] 21 tqykbZ] 2018@30 vk"kk<+] 1940
deviation allowed during a time block shall not exceed the limits specified in the
Himachal Pradesh Electricity Regulatory Commission (Deviation Settlement
Mechanism and related matters) Regulations, 2018. Such deviations should not
cause system parameters to deteriorate beyond permissible limits and should not
lead to unacceptable line loadings. Inadvertent deviations, if any, from the ex-
power plant generation schedules shall be appropriately priced in accordance with
Himachal Pradesh Electricity Regulatory Commission (Deviation Settlement
Mechanism and related matters) Regulations, 2018.”;
(VII) for the existing sub-para 6.4.9 of para 6.4, the following shall be substituted,
namely :—
“ 6.4.9 All the Users are required to abide by the concept of frequency linked load
dispatch and pricing of deviations from schedule as per the provisions of
Himachal Pradesh Electricity Regulatory Commission (Deviation Settlement
Mechanism and related matters) Regulations, 2018. All SSGS shall normally be
operated according to the standing frequency linked load dispatch guidelines
issued by the SLDC to the extent possible, unless otherwise advised by the
SLDC.”;
(VIII) after the sub-para 6.4.13 of para 6.4, the following new sub- para 6.4.14 shall be
added, namely :—
“6.4.14 The treatment of injection of infirm power by generating stations during testing
shall be in accordance with the Himachal Pradesh Electricity Regulatory
Commission (Deviation Settlement Mechanism and related matters) Regulations,
2018.”;
(IX) for the existing para 6.5, the words, figures and brackets "[to be read with HPERC
(Terms and Conditions for Determination of Hydro Generation Tariff) Regulations,
2007]" shall be omitted.;
(X) for the existing sub-para 6.5.7 of para 6.5, the following shall be substituted,
namely :—
“6.5.7 By 6.00 PM each day, the SLDC shall receive the “net drawal schedule” for the
State in MW from RLDC for each time block, for the next day.”;
(XI) for the existing sub-para 6.5.8 of para 6.5, the following shall be substituted,
namely :—
“ 6.5.8 SLDC shall apportion the net drawl schedule for the State received from RLDC
among the beneficiaries based on their entitlements as approved by GoHP in the
ISGS and BBMB generating stations and bilateral trades. SLDC shall also revise
the dispatch schedule of each of the SSGS (if necessary) in the light of net drawl
schedule communicated by RLDC. SLDC shall convey by 7.00 PM each day, the
following :
(i) The ex-power plant “dispatch schedule” to each of the SSGS in MW for each time
block, for the next day.
(ii) The “net drawl schedule” from SSGS, ISGS and BBMB generating stations and
bilateral trades to each of the beneficiary in MW for each time block, for the next
day.”;
3463
jkti=] fgekpy izns'k] 21 tqykbZ] 2018@30 vk"kk<+] 1940
(XII) for the existing sub-para 6.5.19 of para 6.5, the following shall be substituted,
namely :—
“Revision of declared capability by the ISGS and BBMB generating stations and
requisition by beneficiary(ies) during any time block shall also be permitted on
intimation from RLDC. Revised schedules/declared capability in such cases shall
become effective from the 4th time block, counting the time block in which the request
for revision has been received in the RLDC to be the first one. SLDC shall intimate all
the concerned State Entities about such modifications in the drawal/despatch schedules
and advise them to effect corresponding change in their drawal schedules.”;
(XIII) for the existing sub-para 6.5.27 of para 6.5, the following shall be substituted,
namely:—
“6.5.27 While availability declaration by SSGS may have a resolution of one decimal
(0.1) MW and one decimal (0.1) MWh, all entitlements, requisitions and
schedules shall be rounded off to the nearest two decimals at each control area
boundary for each of the transaction, to have a resolution of 0.01 MW.
6.5.28 Such generating stations as are selling entire saleable energy to the distribution
licensee and are not considered as separate State Entities in view of explanation
under clause (a) of para 6.3A, shall submit their projections/estimates and other
online and offline data as may be required by ALDC so as to enable the ALDC to
prepare consolidated schedule of the distribution licensee and also to keep SLDC
updated on the information relating to the distribution licensee, including the
same for such generating stations.”; and
(XIV) after sub-para 6.6.7 of para 6.6, the following new sub-para shall be added,
namely :—
“6.6.8 In case of the energy consumed by the open access consumer is metered in
kVAh, the conversion into kWh shall be made by using the power factor
applicable for respective time blocks, so as to automatically take care of aspects
of reactive power compensation. However, the provisions of 6.6.1 to 6.6.7 which
are basically meant for cases where metering is done on kWh basis, shall not be
applicable in such cases.”
8. In "Annexure-1" of the said Code —
(I) the words, brackets and sign “(Applicable w.e.f. such date as maybe decided by
the Commission for introduction of Intra State ABT)” appearing before para 1 of
this Annexure, shall be omitted.;
(II) for the word “beneficiaries” wherever appearing in this Annexure shall be
substituted with the words and sign “beneficiaries/State Entity”.;
(III) for the existing para 2, the following shall be substituted, namely :—
“2. The sum of the above two charges from all State Entities shall fully
reimburse the SSGS for the generation tariff according to the given dispatch
schedule. In case of a deviation from the dispatch schedule, the settlement
for the under injection/over injection as the case may be, shall be carried out
as per the Himachal Pradesh Electricity Regulatory Commission (Deviation
Settlement Mechanism and related matters) Regulations, 2018.”;
3464
jkti=] fgekpy izns'k] 21 tqykbZ] 2018@30 vk"kk<+] 1940
(IV) for the existing para 3 , the following shall be substituted, namely :—
“3. The summation of station-wise ex-power plant dispatch schedules from each
generating station and any bilaterally agreed interchanges of each beneficiary
shall be adjusted for transmission and distribution losses, and the net drawl
schedule so calculated shall be compared with the actual net drawl of the
concerned State Entity. The excess or under drawl if any, shall be settled as
per Himachal Pradesh Electricity Regulatory Commission (Deviation
Settlement Mechanism and related matters) Regulations, 2018.”;
(V) for the existing para 5, the following shall be substituted, namely :—
“5. The SLDC shall prepare the State Energy Accounts on monthly basis and on
weekly basis the statements of deviation charges, Reactive Energy Charges
and any other relevant details. The SLDC shall provide such statements to all
the State Entities, for each period of the seven days ending on the previous
Sunday mid-night, within 3 days of issuance of bills/accounts by NRPC for
that period of seven days.”;
(VI) for the existing para 6, the following shall be substituted, namely :—
“6. The deviation charges billed for entire SLDC control area by NRPC under
relevant regulations of CERC as well as the bills for URS procured by SLDC
in order to maintain Grid security shall be allocated by SLDC to the State
Entities based on the State Energy Accounts prepared by the SLDC within 3
days from the receipt of the weekly bill from NRPC. The amount of such
consolidated bills for the SLDC control area as well as the amounts
payable/receivables by the State Entities on the basis of weekly statements
prepared by SLDC shall be settled as per the provisions of Himachal Pradesh
Electricity Regulatory Commission (Deviation Settlement Mechanism and
related matters) Regulations, 2018.” ; and
(VII) after para 11, the following new para shall be inserted, namely :—
“12. The provisions of Himachal Pradesh Electricity Regulatory Commission
(Deviation Settlement Mechanism and related matters) Regulations, 2018
shall be applicable for the various aspects covered in para 1 to 6 and (11) of
this annexure.”
9. In "Annexure-2" of the said Code—
(I) for the existing para 15, the following shall be substituted, namely :—
“15. Only functional requirement from regulatory perspective are given in this
code. Detailed specifications for the meters, their accessories and testing as well
as the procedures for collecting their weekly readings shall be finalized by the
STU duly keeping in view the latest requirements under the practices being
followed, the provisions in the various regulations scope in various schemes like
SAMAST etc.”;
(II) for the word “beneficiaries” wherever appearing in this Annexure shall be
substituted with the words and sign “beneficiaries/State Entity”.
10. In "Annexure-3" of the said Code—
for the word “beneficiaries” wherever appearing in this Annexure shall be substituted with
the words and sign “beneficiaries/State Entity”.
BY ORDER OF THE COMMISSION,
Sd/-
Secretary.
3465
jkti=] fgekpy izns'k] 21 tqykbZ] 2018@30 vk"kk<+] 1940
fgekpy izns'k fo/kku lHkk lfpoky;] f'keyk&171004
vf/klwpuk
f'keyk&4] 16 tqykbZ] 2018
la[;k%fo0l0@LFkk0@fo0ijh{kk@6&41@2000&IV.—fgekpy izns'k fo/kku lHkk lfpoky; dh
vf/klwpuk la[;k% 6&41@2000&fo0l0] fnukad 20 vizSy] 2002 }kjk vf/klwfpr fgekpy izns'k fo/kku lHkk
lfpoky; ¼foHkkxh; ijh{kk½ fofu;e] 2002 ds vuqlj.k esa bl lfpoky; ds ik= ,sls jktif=r@
vjktif=r vf/kdkfj;ksa@deZpkfj;ksa] ftUgksaus vHkh rd foHkkxh; ijh{kk mÙkh.kZ ugha dh gS ;k va'kr% mÙkh.kZ
dh gS] dks lwfpr fd;k tkrk gS fd mDr fofu;eksa esa fufgr foHkkxh; ijh{kk dh frfFk;ka fnukad 25] 26
,oa 27 tqykbZ] 2018 dks fuf'pr dh xbZ gSaA ftldk fooj.k fuEu izdkj ls gS %&&
Ø- la-
fnukad
le;
isij la[;k
1-
25&07&2018
11-00 cts ¼iwokZའls 2-00 cts ¼vijkའrd
I
2-
26&07&2018
11-00 cts ¼iwokZའls 2-00 cts ¼vijkའrd
II
3-
27&07&2018
11-00 cts ¼iwokZའls 2-00 cts ¼vijkའrd
III
ik=rk ,oa vU; lEcfU/kr 'krs± fgekpy izns'k fo/kku lHkk lfpoky; ¼foHkkxh; ijh{kk½ fofu;e]
2002 ds vuq:i gksaxh A
gLrk{kfjr@&
lfpo]
fg0 iz0 fo/kku lHkk A
&&&&&&&&&&
TRANSPORT DEPARTMENT
NOTIFICATION
Shimla-2, the 13th July, 2018
No. TPT-F(5)-14/2018.—The Governor, Himachal Pradesh is pleased to constitute a
committee on Shimla Mobility Plan with the following constitution :
1. Principal Secretary (Transport), HP
Chairman
2. Deputy Commissioner, Shimla
Member
3. Superintendent of Police, Shimla
Member
4. MD, HRTC
Member
5. Director, Information Technology, Shimla
Member
6. Commissioner, Municipal Corporation, Shimla
Member
7. Superintending Engineer, 4th Circle, Winterfield Shimla-3
Member
8. Sub-Divisional Officer (Urban), Shimla
Member
9. Sub-Divisional Officer (Rural), Shimla
Member
10. Director, Transport, H.P. Shimla
Member-Secretary
3466
jkti=] fgekpy izns'k] 21 tqykbZ] 2018@30 vk"kk<+] 1940
The Committee shall have the following objectives:—
1. Initially, to list the challenges and innovative solutions through which different issues
of mobility can be solved in Shimla.
2. To formulate a mobility strategy for Shimla after due deliberation on strengths,
opportunities and challenges lying therein, focusing on different modes of Transport
such as roads, rails, and the inter modal connectivity to offer seamless travel for
passengers which is safe, user-friendly and cost effective.
3. To act as a thinktank and coordinating body for all the mobility initiatives in Shimla.
4. To align the efforts and provide feedback regarding departmental initiative for
Shimla’s mobility.
By order,
JAGDISH CHANDER SHARMA,
Principal Secretary (Transport).
__________
In the Court of Dr. Amit Guleria, H.A.S., Marriage Officer-cum-Sub-Divisional
Magistrate, Kullu, District Kullu, H.P.
In the matter of :
1.
Ravi Bodh s/o Ranjeet Singh, r/o Village Shurad, P.O. Khokhan, Tehsil Bhuntar,
District Kullu, H.P.
2.
Passang Dolma d/o Shri Dawa Sherpa, r/o Village Burua, P.O. Bahang, Tehsil Manali,
District Kullu, H.P.
. . Applicants.
Versus
General Public
Subject.—Proclamation for the registration of marriage under section 16 of Special Marriage Act,
1954.
Ravi Bodh and Passang Dolma have filed an application alongwith affidavits in the court of
undersigned under section 16 of Special Marriage Act, 1954 that they have solemnized their
marriage on 05-08-2017 and they are living as husband and wife since then, hence their marriage
may be registered under Act, ibid.
Therefore, the general public is hereby informed through this notice that any person who
has any objection regarding this marriage can file the objection personally or in writing before this
court on or before 16-08-2018. The objection received after 16-08-2018 will not be entertained and
marriage will be registered accordingly.
Issued today on 16-07-2018 under my hand and seal of the court.
Seal.
Dr. AMIT GULERIA (HAS),
Marriage Officer-cum-Sub-Divisional Magistrate,
Kullu, District Kullu, H.P.
fu;U=d] eqnz.k rFkk ys[ku lkexzh] fgekpy izns'k] f'keyk&5 }kjk eqfnzr rFkk izdkf'kr
bysDVªkWfud gLrk{kfjr jkti=] oSclkbV http://rajpatrahimachal.nic.in ij miyC/k gS ,oe~ vkWuykbu lR;kfir fd;k tk ldrk gS