jkti=] fgekpy izns'k
fgekpy izns'k jkT; 'kklu }kjk izdkf'kr
eaxyokj] 30 tqykbZ] 2019@08 Jko.k] 1941
fgekpy izns'k ljdkj
URBAN DEVELOPMENT DEPARTMENT
NOTIFICATION
Shimla-2, the 20th July, 2019
No. UD-F(10)-2/2019.—In exercise of the power conferred by clause (1) of Rule 9 of the
Construction and Demolition Waste Management Rules, 2016, the Governor, Himachal Pradesh is
pleased to notify “ Himachal Pradesh State Construction and Demolition Waste Policy and Strateg"
as per enclosed Annexure –“A” with immediate effect.
By order,
PRABODH SAXENA,
Pr. Secretary(UD).
94&jkti=@2019&30&07&2019
¼4211½
4212
jkti=] fgekpy izns'k] 30 tqykbZ] 2019@08 Jko.k] 1941
ANNEXURE-A
HIMACHAL PRADESH STATE POLICY AND STRATEGY ON MANAGEMENT OF
CONSTRUCTION AND DEMOLITION WASTE
1.
INTRODUCTION
With rapid urbanization in the State of Himachal Pradesh, one of the fastest growing
Industry is tourism which will involve development of infrastructure in both private & Govt. Sector
and it is expected to continue growing expontentially with the increase in urban population. The
increase in the number of buildings, expansion of urban infrastructure (such as roads, bridges,
flyovers, dams etc. ) and demolition of old buildings has also resulted in immense amount of waste
being generated in the form of debris, building materials etc. In addition, with increased
urbanisation and infrastructure creation, there is a shortage of conventional building materials such
as aggregates, sand and significant increase in the price of building materials such as concrete and
bricks. Therefore, to deal with the issue of rising C&D Waste generation in India, the challenge of
C&D Waste is recycling and sustainable use of natural resources. The Government of India issued
the Construction and Demolition Waste Management Rules, 2016 (“C&D Rules”) in March 2016.
These Rules apply to every waste resulting from construction, remodeling, repair and demolition of
any civil structure of individual or organization or governmental authority that generates
construction and demolition waste.
Currently in India, C&D Waste management is in a nascent stage, where a portion of C& D
waste is used for filling and leveling low-lying areas and some resources are recovered from C&D
Waste. However, a majority of C&D Waste is dumped in landfills or is illegally disposed of in
water bodies, rivers and mangroves. It is also common to see C&D Waste littered on pavements
and in open plots (this practice is known as fly-tipping) or along the hill slopes along the road sides.
Many times, such waste is often mixed with municipal solid waste making the municipal waste
heavy and unsuitable for further processing such as composting, recycling or energy recovery.
Given that material costs comprise nearly 40 to 60 percent of the Project cost in the construction
industry, sustainable management of C&D Waste can result in significant cost savings for industry
and other stakeholders. Therefore, the dumping practices are not only unsustainable but also lead to
a loss of resources as C&D Waste can be recycled into reusable products which greatly reduce the
stress on the mining of virgin materials. The processing of the C&D Waste also reduces the total
amount of inert wastes that are disposed of in landfills.
The issue of C&D Waste has entered the public discourse relatively recently and therefore,
there have been historically very little efforts to keep records of its generation and composition. In
addition, C&D Waste is often clubbed with solid waste and thus, the magnitude of the problem is
underestimated by all stakeholders involved. This has resulted in no formal system for prevention,
reduction, management, reuse and recycling of C&D Waste. The Technology, Information,
Forecasting and Assessment Council (TIFAC) considers approximately 25% of all solid waste to be
C&D Waste and therefore, using this metric, it can be estimated that a large quantity of C&D waste
is generated in the State of Himachal Pradesh too.
However, these numbers cannot be considered as comprehensive and reliable data on C&D
Waste and therefore, it is necessary for a complete and credible assessment to be carried out by the
ULBs on the actual C&D Waste that is generated within their jurisdictional limits and such data to
be compiled by the State Pollution Control Board. This is in line with the requirement under C&D
Rules where ULBs are required to keep track of the generation of construction and demolition
waste within its jurisdiction and establish a database and update it once in a year. The ULB and the
HPSPCB should recognize C&D Waste as a separate stream of waste and begin the enumeration of
its quantities of generation, collection and disposal in the statutory reports.
2.
S
2.1
C
C
c
m
ex
ro
p
2.2
C
p
a
an
o
c
3.
O
R
Developm
respect t
contained
prepared
increasin
ULBs an
within th
T
Himacha
(a
(b
SOURCES
Constructio
C&D Rules
onstruction
mainly gene
xisting buil
oads (v) in
pipelines) (v
Component
project-speci
ctivity and
nd depends
out by Techn
omposition
OBJECTIV
Rule 9 (1)
ment in the
o managem
d in C&D R
d for the St
ngly being g
nd other sta
heir jurisdict
The objectiv
al Pradesh S
a) Avoid,
b) Avoid a
jkti=]
OF CONS
on and Dem
as the wast
, remodelin
erate C&D
ldings (iii) d
nstallation
vi) construct
ts of C&D
ific and diff
re-developm
s on the age
nology, Info
of C&D W
VES
of the C&
e State Go
ment of cons
Rules. Pursu
tate of Him
generated.
akeholders t
tions.
ves of the Co
State are:
minimize, r
and minimiz
36%
Typ
fgekpy izns
TRUCTIO
molition W
te comprisin
ng, repair a
Waste are
demolition o
and service
tion/renovat
Waste: Th
ffers accordi
ment of the
e and type
formation, F
Waste in Indi
&D Rules, 2
overnment i
struction an
uant to this
machal Pra
This policy
to prepare t
onstruction
reuse, recyc
ze construct
2%
pical compos
ns'k] 30 tqyk
ON & DEM
aste (also r
ng of buildi
and demolit
e (i) constr
of old build
e of public
tion of publ
he composit
ing to the ra
city. The co
of building
Forecasting
ia is shown
2016 envis
is required
nd demolitio
provision,
desh to su
y is aimed
the plan and
and Demol
cle and disp
tion waste t
% 2%
5%
1%
31%
sition of C&D
kbZ] 2019@0
MOLITION
referred to
ing material
tion of any
ruction of
dings (iv) ex
c utilities (
lic infrastru
tion of C&D
ate of urban
omposition
g. Generally
and Assess
in figure-1
ages that t
to prepare
on of waste
this policy
stainably m
at relevant
d procedure
lition Waste
ose off C&D
through des
%
%
D Waste in I
08 Jko.k] 19
WASTE
as C&D W
ls, debris an
civil struct
new buildi
xcavation/la
(telephone/w
cture (bridg
D Waste is
nisation, the
also varies
y, however
sment Coun
below:
the Secretar
e the State
e in accorda
document o
manage the
authorities
es for mana
e Managem
D Waste.
ign and con
Bitumen
Wood
Metal
Others
Brick & Ma
Soil, Sand &
ndia
941
Waste) is de
nd rubble re
ture. The a
ings, (ii) re
aying of asp
water/electr
ges/flyovers
city-specif
e pace of de
according t
as per the s
ncil (TIFAC
ry In-Charg
Policy Do
ance with th
on C&D W
C&D Wa
s, other fun
agement of
ment Policy d
nstruction m
asonary
& Gravel
421
efined by th
esulting from
activities th
enovation o
halt/concret
ricity/sewag
s).
fic as well a
evelopment
to the proje
study carrie
C), the typic
ge of Urba
cument wit
he provision
Waste is bein
ste which
nctionaries o
C&D Wast
document fo
management
13
he
m
at
of
te
ge
as
al
ct
ed
al
an
th
ns
ng
is
of
te
or
t.
4214
jkti=] fgekpy izns'k] 30 tqykbZ] 2019@08 Jko.k] 1941
(c) To ensure collection, storage and processing of C & D waste.
(d) To ensure that no C & D waste is dumped in the open spaces.
(e)
(f)
To ensure that all Urban Local Bodies effectively implement the C & D Waste
Management.
(g) Plan to avoid the environmental problems that arise owing to open dumping of these
wastes.
(h) To identify suitable lands for dumping of C & D waste and further its processing
through Private Operators/ Agencies or by ULB itself.
(i)
To ensure involvement of different stakeholders in the successful implementation of
C & D Waste Management Policy.
(j)
To effectively comply with the provisions of C&D Rules.
4.
PRINCIPLES FOR MANAGEMENT OF C&D WASTE
The Concept of “3R” Principle has been proposed for reducing, reusing and also recycling
wastes of the construction industry. The different processes involved in construction projects
namely designing, production and manufacturing at the construction sites directly lead to waste
creation, therefore it is essential for a green economy to follow the “3R” principle in the
construction projects.
(a) Reduce
Potential wastes can be identified early in the design process itself and measures should be
taken during design stage to minimize the waste that is likely to be generated. Waste reduction can
be achieved by designing with standard sizes for all building materials, planning for flexible spaces
and ensuring that designs are adaptable to changing uses and are amenable for deconstruction and
reconstruction.
(b) Reuse
This involves identification of waste that can be salvaged for reuse in the current Project or
another Project or that can be donated. A comparison of the value of the materials “as it is” for
salvage or to its value as materials for recycling may be considered prior to reuse in many cases.
Some of these materials may be valuable to reuse on-site; others may be sold to be used as building
material in another site or donated to a charitable organization.
(c) Recycle
After exploring all the options to prevent waste and salvaging and reusing materials, the
next step is to recycle as much of the remaining debris as possible. Recycling saves money by
minimizing disposal costs.
4.1
C&D WASTE MANAGEMENT
The involvement of all stakeholders and adoption of suitable management practices is key
to successfully achieving efficient C & D Waste Management.
4215
jkti=] fgekpy izns'k] 30 tqykbZ] 2019@08 Jko.k] 1941
No Littering Zones
Forest land, water bodies, drains, flood plains, road side etc. be declared as no littering
zones and littering in this zone be made a cognizable offence.
Designated Dumping Site
I.
The name and capacities of the designated dumping sites should be available on a web
platform.
II.
The dedicated website/link should be available in public domain to apply for the
permit for transportation of the C&D waste, to remit the fee and to obtain the permit
for transportation.
Waste Reception Facilities
i.
Stock pilling area—Area located for temporary stockpile of waste for later use
ii.
Recycling area
iii. Reclamation sites-designated part of a development project that excepts C&D waste
for reclamation purpose.
iv. On site collection of waste through MC dumpers
“Waste Generator” is defined by the C&D Rules as any person or association of persons
or institution, residential and commercial establishments including Indian railways, airport, port
and harbour and defence establishments who undertakes construction or demolition of any civil
structure which generate C&D Waste.
“Bulk Waste Generators” Waste generators who generate more than 20 tons or more in
one day or 300 tons per project in a month have been identified separately in the C&D Rules and
have additional obligations attached to them. For the purposes of the Himachal Pradesh State C&D
Policy, this category of these waste generators will be considered as “bulk waste generators”.
“Service Providers” The third category of waste generators identified in the C&D Rules is
the “Service Providers” and are defined as authorities who provide services like water, sewerage,
electricity, telephone, roads, drainage etc. who often generate C&D Waste during their activities,
which includes excavation, demolition and civil work.
The Rural area and Semi-Urban area also needs to frame guidelines for proper disposal of
C&D waste and also supposed to work in harmony with urban areas.
4.2
The Management of C & D waste from Generation to Disposal can be illustrated as
below:
Waste Management Plan
Every builder and Govt./private executing agency like HPPWD, HIMUDA, BSNL etc.
while constructing roads or any other project should submit a Waste Management Plan which
4216
jkti=] fgekpy izns'k] 30 tqykbZ] 2019@08 Jko.k] 1941
should include key waste types, arrangements for onsite sorting and proposal disposal of surplus
earth. Copy of each award letter should be submitted to Municipal Corporation/concerned ULB for
information.
4.3 Procedure for application and grant of permission
(i)
Applicant or the person concerned, intending to commence construction within the
area of the ULB, shall in writing submit detailed estimate of muck to be generated
from the plot/construction site to the Corporation on the prescribed proforma annexed
with these bye-laws as Appendix-I at the time of submission of his/her building
map/plan for sanction. However, in the case of repair of building or in the case where
no planning permission is required, the permission for dumping debris shall be
obtained from the ULB authorities by moving an application mentioning therein full
particulars of the applicant, location of the building and the estimate/quantity of muck
to be generated.
(ii) The estimate submitted by the applicant shall be verified by the technical wing of ULB
after spot inspection and thereafter shall be sent to the concerned branch for raising the
bill and for according necessary permission in favour of the applicant.
(iii) The permission for dumping of debris shall be accorded only after obtaining receipt of
the amount to be deposited by the applicant in the ULB on this account.
(iv) The place for dumping of muck shall be communicated to the applicant by the ULB in
writing and the name of the place/site for dumping of debris by the applicant shall also
be mentioned in their building sanction letter. Further, intimation of the same shall also
be given to the concerned branch of ULB or to the concerned agency or the contractor
hired or engaged by the ULB for managing the dumping site.
Collection and transportation of
C& D Waste
Receiving of C&D waste
The Recycled material can
be processed through MSW
Recycling/Processing &
disposal facility
Removal of Iron, Al, Wood, Plastics etc.
Processing of C&D Waste “[Hammering,
Crushing, Washing, size Separation &
Physicochemical Processes]
Recycled products recovery
4217
jkti=] fgekpy izns'k] 30 tqykbZ] 2019@08 Jko.k] 1941
(v) During transportation of the muck, a person shall have to carry the original
permission, a copy of which shall be affixed on the windscreen of the vehicle and the
same shall have to be shown to the authorized officer/official of the ULB at the time
of inspection. However, in case of manual transportation of debris the person carrying
the same shall have to show the original sanction to the inspecting staff/authorized
officer/official at the time of inspection.
(vi) There shall be a restriction on movement of the vehicles carrying muck after the sun
set and before the sun rise. The normal timings for dumping muck at the dumping site
will be between 9.00 A.M. to 5.00 P.M. However, in case of exigencies and in view of
traffic regulations in the area the ULB may in writing relax such timings.
(vii) No one shall be permitted to carry the digging and excavation of plot or land after sun
set and before sun rise but the ULB, in the larger public interest or in the case of
emergent circumstances may relax such imposition/restrictions, on receiving written
request from the applicant or the concerned agency or the authority interested in this
regard.
(viii) The person, after obtaining the sanction of building map from the competent authority
or before raising the construction at site, is required to install a painted board of the
size of 3' x 2' indicating therein the number and date of the sanction, commencement
of construction and hours during which construction can be carried out, time when
excavation can be done, name of dumping site allotted to the applicant for the purpose
of dumping muck, nature of sanction, the area of construction sanctioned on each floor
and the telephone number of the Control Room set up by the ULB for entertainment of
complaints etc.
(ix) The authorized officer/official of ULB shall prescribe the conditions relating to the
application of muck generation from the plot, grant of sanction for muck disposal and
condition relating to affixing of board at site giving therein the detail as mentioned in
clause at the time of grant of building sanction.
(x) Each vehicle carrying the C&D waste should be entered on the respective dumping site
and its entry with its load should be made against the concerned dumping site
simultaneously so that the capacities of the dumping sites are updated regularly on the
web platform.
(xi) At the end of the year cross checking of the permits issued and permits entered on the
dumping sites should be checked and in case of discrepancies (e.g. the person has
deposited the permit fee but has not dumped the material on the designated site) the
violator should be penalized.
(xii) It may be better to include the transportation charges in the permit fee and provide the
transportation to the C&D waste generators.
5.
ROLES & RESPONSIBILIES
5.1.
Role of Waste Generators
C&D Waste Management Rules, 2016 provides that every Waste Generator is responsible
for collection, segregation and storage of C&D Waste used to be generated by the generators. The
Generator is required to ensure that other waste (such as Municipal Solid Waste and Hazardous
4218
jkti=] fgekpy izns'k] 30 tqykbZ] 2019@08 Jko.k] 1941
Waste) does not get mixed with the C&D Waste and that the C&D Waste is stored and disposed of
separately. Every waste generator is mandated to keep the C&D Waste within the premises or get
the waste deposited at the collection centre made available by the Urban Local Body or handed
over it to the authorised processing facilities of C&D Waste and to ensure that there is no littering
of such waste.
Waste generators who generate more than 20 tons or more in one day or 300 tons per
Project in a month shall segregate the waste viz. concrete; soil; steel; wood & plastics; bricks &
mortar and shall submit Waste Management Plan. The Waste Generator should get prior approval
from the local authority before starting construction or demolition or remodeling work and keep the
concerned Urban Local Body informed regarding the relevant activities from the planning stage to
the implementation stage and this shall be done by Project Proponent on project to project basis.
5.2.
Role of Urban Local Bodies
The Urban Local Bodies, in coordination with the concerned District Administration, shall
identify suitable land for setting up of storage, processing and recycling facilities for Management
of Construction and Demolition Waste. ULBs can also set up these facilities in clusters by
executing an agreement with other ULBs which will interalia include operation & maintenance,
sharing of sum received out of collection of C&D waste & other conditions as deemed fit etc.
The processing or recycling site shall be away from habitation clusters, forest areas, water
bodies, monuments, National Parks, Wetlands and places of important cultural, historical or
religious interest.
The time frame for suitable site selection and implementation of C & D Waste Management
facility is as per Schedule-I.
6.
COLLECTION AND TRANSPORTATION OF C & D WASTE
Collection and Transportation of Construction and Demolition Waste shall be done by the
Urban Local Bodies (ULBs) or by authorised private agency within two days of receiving
information or any complaint regarding generation of C & D waste. The following considerations
shall be kept in mind while planning for Collection and Transportation activity.
For small generators of C&D Waste (such as waste emanating from petty construction,
repair or maintenance works), ULB shall consider two options (a) deposit of C&D
Waste by the small generators at collection centres/earmarked areas; or (b) removal of
the C&D Waste by the ULBs through itself and/or authorised private party on payment
basis. The fees for collection of C & D Waste by ULBs/authorised agency is defined in
terms of Schedule-I.
Waste generators who generate 20 tons or more in one day or 300 tons per Project in a
month shall be responsible to segregate the C & D waste in different streams at their
sites and shall recycle and reuse the waste to the maximum extent possible. The fees
for collection of C&D Waste by ULBs/ authorised agency is in terms of Schedule-II.
The Waste Generators shall inform the Urban Local Body or the authorised agency in
writing/or online within three days before generation of C & D waste for collection of
such waste by paying the charges as mentioned in Schedule-II. The Urban Local Body
or its authorized agency shall collect the C & D Waste within two days of receiving the
information or complaint about the C&D waste generation. If information about the
4219
jkti=] fgekpy izns'k] 30 tqykbZ] 2019@08 Jko.k] 1941
generation of waste is not given to the concerned ULB and the charges for collection
are not deposited within 3 days of the generation of waste, any complaint received
about C&D generator unauthorized dumping a penalty of Rs. 20,000/- per event shall
be charged to the Waste Generators as per Rule-7 (xii) Schedule-II (Item No.8) of
Solid Waste Management Bye-laws of respective Urban Local Body.
In order to create awareness about management of C & D Waste, the Urban Local
Body shall carry out massive awareness campaigns and will also release public notices
in at least two local news papers. The sample reference copy for releasing the Public
Notice is annexed as Annexure-1.
All ULBs shall publicize the rates for collection, transportation and storage of C&D
Waste and shall publish such rates on their websites, offices, local newspapers and
public places.
The Standard Operating Procedure (SOP) for the entire collection and transportation
process is given below:—
Recycling of C&D Waste is essentially required, because it reduces the dependence on
natural resources and eliminates adverse environmental impacts such as mining of virgin materials.
Recycling of C&D wastes also reduces the quantum of C&D waste ending up at landfills and open
spaces. It is mandated under the C&D Rules for the ULBs to make arrangements for the processing
and disposal of C&D Waste, either themselves or by appointing authorised agencies.
Waste Generator informs the
ULB in writing/online (within 2
days of generation of waste).
Any
complaint
received
about
C&D
Generator
or
its
unauthorised disposal.
The ULB registered the information / complaint in the format given in
Annexure-2
Collection charges can
be submitted by the
Generator at the ULB
to
the
authorized
agency as decided by
the ULB.
Upon
registering
the
information,
the
ULB
gets disposed the C&D
Waste within 2 days
through
its
own
resources
or
through
agency
and
ensures
maintenance of trip sheet
as per Annexure-3.
Violators
is
to
be
penalized as per the
provisions of policy.
4220
jkti=] fgekpy izns'k] 30 tqykbZ] 2019@08 Jko.k] 1941
Construction and Demolition Waste can be used in the following manner:—
Reuse (at site) of bricks, stone slabs, timber, conduits, piping railings etc. to the extent
possible and depending upon their condition.
Sale/auction of material which cannot be used at the site due to design constraint or
change in design.
Plastics, broken glass, scrap metal etc. can be used by recycling industries.
Rubble, brick bats, broken plaster/concrete pieces etc. can be used for building activity,
such as, levelling, under coat of lanes where the traffic does not constitute heavy
moving loads.
Larger unusable pieces can be sent for filling up low-lying areas.
Fine material, such as, sand, dust etc. can be used as cover material over sanitary
landfill.
Use as a granular sub-base (the layer above compacted earthen sub-grade) in road
construction.
Processed C&D waste (after sizing and sieving) can be used in road pavement for sub-
base construction.
7.
PROCESSING OF C&D WASTE
7.1
Utilizations of C & D Waste Streams
Reusing of C& D Waste: It does not require any further processing to convert into a useful
product. The items which are usable directly are screened out from the debris and put into the
possible use without further processing.
Recycling of C&D Waste: Once the waste generated from construction and demolition
activities has been segregated and reusable items are taken out, the leftover is available for further
processing i.e. recycling into next useful stage.
7.2
Machinery for Recycling
Once the structure is demolished as per the plan in an Engineering manner, use of
appropriate equipment and machinery is essential in the recycling process. Such equipment may be
jaw crushers, magnetic separators, vibratory screens, washing equipment etc.
The recycling plant consists of the following technologies:—
1.
Feed hopper
2.
Pre Screening
3.
Washing & aggregate cleaning
4.
Trash Screen for removal of light weights
4221
jkti=] fgekpy izns'k] 30 tqykbZ] 2019@08 Jko.k] 1941
5.
Sizing Screen for washed Aggregate
6.
Hydro cyclone system for Sand washing
7.
Water Management system for recycling of process water
Among the major & minor components of C&D Waste, the most unpredictable and difficult
materials are clay (soil) and all types of floating materials like plastic carry bags, sachets,
thermocol etc. Recycling Technology has provided the solutions to tackle these difficult materials
and make C&D Waste an acceptable quality product for re-use.
The following products can be recovered from recycling:—
1.
Recovery of washed sand for construction
2.
Recovery of 2-3 sizes of mixed Aggregates
3.
RMC made with recovered material
4.
Value-added products like Kerb Stones, Pavement Blocks and Concrete Bricks etc.
8.
GOVERNMENT INITIATIVES TO PROMOTE USE OF C & D WASTE
To promote effective use of C & D Waste and recycled products in different construction
activities the following initiatives/activities should be taken by Urban Local Bodies and by the
State Government:—
8.1.
Duties of Urban Local Bodies
The following initiatives/activities shall be undertaken by Urban Local Bodies to ensure
effective management of C & D Waste:
Shall keep track of the generation of construction and demolition waste within their
jurisdiction, establish a data base and update once in a year.
Shall make provision for giving incentives for use of materials made out of C&D
Waste in construction activities including in non-structural concrete, paving blocks,
lower layers of road pavements, colony and rural roads.
Shall examine and sanction the waste management plan of the generators within a
period of two months or from the date of approval of building plan, whichever is
earlier, from the date of its submission.
Shall create a sustained system of information, education and communication for
construction and demolition waste through collaboration with expert institutions, civil
societies and also disseminate through their own website.
Shall coordinate with the concerned organizations for giving necessary approvals and
clearances to the operators.
That the Residues from construction and demolition waste processing and recycling
industries shall be land filled in the sanitary landfills of solid waste.
4222
jkti=] fgekpy izns'k] 30 tqykbZ] 2019@08 Jko.k] 1941
The Project of processing or recycling shall be large enough to last for 20-25 years
(project based on-site recycling facilities).
Shall identify land for processing or recycling site which is away from habitation
clusters, forest areas, water bodies, monuments, National Parks, Wetlands and places
of important cultural, historical or religious interest.
The Urban Local Bodies, in consultation with the State Pollution Control Board, shall
ensure that a buffer zone is maintained around solid waste processing and disposal
facilities exceeding five tonnes per day of installed capacity.
Shall ensure that processing or recycling sites are fenced or hedged and provided with
proper gate to monitor incoming vehicles or other modes of transportation and facility
of CCTV may also be explored.
Shall ensure that the approach and internal roads are concreted or paved so as to avoid
generation of dust particles due to vehicular movement and should be designed so as to
ensure free movement of vehicles and other machinery.
Shall establish provisions of weigh bridge to measure quantity of waste brought at
processing site. Fire protection equipment and other facilities as may be required shall
also be provided.
8.2.
Duties of State Government
The following initiatives shall be taken by the State Government to ensure effective
management of C & D Waste:—
State Government departments and officers dealing with land shall be made
responsible for providing suitable sites for setting up of the storage, processing and
recycling facilities for construction and demolition waste.
The Town and Country Planning Department shall incorporate the site in the approved
land use plan so that there is no disturbance to the processing facility on a long term
basis.
Provisions should be made for making procurement of materials made from
construction and demolition waste mandatory upto a certain percentage (say 10-20%)
in Municipal and Government contracts subject to strict quality control.
Incentive should be given to ULBs for efficient management of C&D waste by
devising a cretarion.
8.3 Duties of the Secretary–in-charge, Urban Development in the State
(i) State policies and strategies should acknowledge the primary role played by the
informal sector of waste pickers, waste collectors and recycling industry in reducing
waste and provide broad guidelines regarding integration of waste picker or informal
waste collectors in the Waste Management System.
(ii) ensure implementation of provisions of these Rules by all local authorities;
4223
jkti=] fgekpy izns'k] 30 tqykbZ] 2019@08 Jko.k] 1941
(iii) direct the Town & Country Planning Department of the State to ensure that master plan
of every ULB in the State provisions for setting up of C&D waste processing and
disposal facilities;
(iv) ensure identification and allocation of suitable land to the local bodies within one year
for setting up of processing and disposal facilities for C&D wastes and incorporate
them in the master plans (land use plan) of the State or as the case may be, cities
through ULBs and district planning committees or Town and Country Planning
Department;
(v) direct the Town Planning Department of the State and local bodies to ensure that a
separate space for segregation, storage, decentralized processing of C&D waste is
demarcated in the development plan for group housing or commercial, institutional or
any other non-residential complex producing 20 tons per day or 300 tons per project in
a month;
(vi) direct the developers of Special Economic Zone, Industrial Estate, Industrial Park to
earmark at adequate land for recovery and recycling of C&D waste;
(vii) facilitate establishment of C&D waste processing facility for a group of ULBs and
towns on a cost sharing basis and ensure professional management of such facility;
(viii)arrange for capacity building of local bodies in managing C&D Waste, segregation and
transportation or processing of such waste at source; and
(ix) notify buffer zone for the C&D waste processing and disposal facilities in consultation
with the State Pollution Control Board.
8.4 Duties of Deputy Commissioner
The Deputy Commissioner shall,
(i)
facilitate identification and allocation of suitable land for setting up of C&D waste
processing and disposal facilities to local authorities in his district in close coordination
with the Secretary-in-charge of State Urban Development Department within one year
from the date of notification of these rules;
(ii) review the performance of local bodies, at least once in a quarter on waste segregation,
processing, treatment and disposal and take corrective measures in consultation with
the Commissioner or Director of Municipal Administration or Director of local bodies
and secretary-in-charge of the State Urban Development.
9.
ENVIRONMENT
MANAGEMENT
PLAN
DURING
PROCESSING
OR
RECYCLING OPERATIONS OF C&D FACILITY
In order to prevent pollution from processing or recycling operations, the following
provisions shall be made:—
(a) Provision of storm water drains to prevent stagnation of surface water.
(b) Provision of paved or concreted surface in selected areas in the processing or recycling
facility for minimizing dust and damage to the site.
4224
jkti=] fgekpy izns'k] 30 tqykbZ] 2019@08 Jko.k] 1941
(c) Prevention of noise pollution from processing and recycling plant.
(d) Provision for treatment of effluents, if any, to meet the discharge norms as per
Environment (Protection) Rules, 1986.
(e) Provision of air pollution control measures such as dust suppression, dust extraction,
Bag filters, Electro Static Precipitators, Scrubbing and Green belt development as per
requirement can be done to meet the prescribed standards laid down by Central
Pollution Control Board & State Pollution Control Board.
(f)
Work Zone air quality at the Processing or Recycling site and ambient air quality at the
vicinity shall be monitored.
(g) The measurement of ambient noise shall be done at the interface of the facility with the
surrounding area, i.e. at plant boundary.
(h) A vegetative boundary shall be made around Processing or Recycling plant or site to
strengthen the buffer zone.
(i)
Every possible measures shall be taken to recycle the water and use in different activity
as far as possible and try to reduce the demand on fresh water.
(j)
An environment cell shall be established to implement the environment standards and
to meet the environmental norms as prescribed by the authority.
10.
FINANCIAL SUSTAINABILITY
The ULB should follow the principles of financial budgeting and costing for the
management of C&D Waste.
In addition, as set out in the said policy, the main sources of revenue for the ULB for C & D
Waste management are:
(i)
User fees which could be collected separately or while sanctioning of the building plan
(ii) Revenue from sale of by-products from C&D Waste
(iii) Fines and penalties. A list of illustrative user fees which the ULB could consider
levying is set out in Annexure I.
11. PENALTIES
1.
Historically, there have been no and/or marginal fines/penalties for non-compliance of
provisions pertaining to management of any stream of municipal solid waste including
C&D Waste. Even in cases where there were penalties prescribed, they were rarely
enforced by the governmental authorities leading to a lackadaisical attitude among
generators, ULB staff, private players and operators of waste processing facilities with
respect to compliance with applicable regulations. Whoever is guilty of dumping of
muck at a place other than the place(s) specified/notified by the ULB, the penalty shall
be imposed in terms of provisions contained in Bye-Laws. Flying Squad consisting of
SDM, EO, RO (Representative of Environment Deptt.) & PWD should be constituted
be make supervise visits & also to address complaints of illegal & unauthorized
dumping.
4225
jkti=] fgekpy izns'k] 30 tqykbZ] 2019@08 Jko.k] 1941
2.
In the above context, in order to ensure compliance with C&D Rules. ULBS should
frame bye-laws for management of C&D Waste and these bye-laws should include
significant penalties to serve as a deterrent against non-compliance. A list of
recommended fines is included as Annexure II to the Himachal Pradesh State C&D
Policy. Further, it is recommended that the penalties be structured as a waterfall
arrangement where penalties increase proportionately for consecutive and repeated
non-compliance(s) by the same person. An example of such waterfall mechanism
could be twice the fine amount for the second offence and thrice the penalty amount
for the third offence and finally, in case of fourth contravention, the ULB should have
the power to stop the construction, demolition and/or renovation activity and/or the
license issued by it to the person for carrying on business. The ULBs could also
structure the penalties as a percentage of the Project value and/or quantity of C&D
Waste dumped in contravention of the C&D Rules. The penalty amounts should be
escalated every year by a specified percentage to take into account the inflation and
other costs of recovery for the ULB.
In case of repeated violation, in addition to penalty as specified above, the owner at
whose instance the construction/excavation work is carried out and is found dumping
the muck illegally or without the permission of the competent authority, as the case
may be, shall also be liable for disconnection of water, electricity and others civic
amenities and the Executive Head of ULB may request the competent authority for
withdrawal of recognition and registration if any granted in his/her favour including
withdrawal of building sanction granted in favour of the owner concerned. In addition
to the above, the dumped material shall be lifted & disposed by the ULB at the cost of
the violator.
3.
ULBs should also be empowered to recover the penalty amounts as per the different
modes set out in Himachal Pradesh Municipal Corporation Act, 1994 and HP
Municipal Council Act, 1994. In addition, the ULB should have the liberty to initiate
appropriate proceedings under any other applicable law such as Municipal Corporation
Act, 1994/ HP Municipal Council Act, 1994, Environment (Protection) Act, 1986, the
Indian Penal code, 1860, the Water (Prevention and Control of Pollution) Act, 1974,
the Air (Prevention and Control of Pollution) Act, 1981 for violation of the SWM
Rules 2016 and bye-laws framed by the ULB.
4.
All amounts collected as penalties by and on behalf of the ULB under the bye-laws
should be transferred to a separate bank account maintained for funds for solid waste
management. These amounts shall be used towards the ULB’s operation and
maintenance costs for providing C&D Waste management services, salaries of
personnel, incentives, grants and other uses as may be considered appropriate by the
ULB from time to time.
5.
Impounding of vehicle.—(i) Any officer of the Flying Squad or the police
establishment either on the information received by himself or through any other
source immediately on receiving such information, may stop and inspect the vehicle
carrying muck for the purpose of ascertaining the required permission at any point of
time and impound the same if found violating the provisions of these Bye-laws.
6.
The vehicle shall only be released in case the registered owner of the vehicle applies
for compounding of offence(s) under these Bye-laws.
7.
The official impounding the vehicle shall immediately report to this effect in writing
either to the Commissioner/Joint Commissioner of the Corporation or Executive
4226
jkti=] fgekpy izns'k] 30 tqykbZ] 2019@08 Jko.k] 1941
Officer of ULB and keep the same in custody at the place designated by the ULB till it
is not released to the registered owner. The halt charges of the vehicle at such
designated place shall be levied at the rate of ` 1000/- per day payable by registered
owner to the ULB in cash or through demand draft.
8.
Compounding of offences.—All the offences punishable under these Bye-laws may,
before, the institution of prosecution, be compounded by such officer as may be
authorized by the ULB in this behalf, on payment of such sum as may be specified by
such officer under these Bye-laws.
9.
Offences to be tried summarily.—The offences which are not compounded shall be
tried in a summary manner by the Special Judicial Magistrate First Class of the
Corporation under section 383 of the Himachal Pradesh Municipal Corporation Act,
1994 read with Section 260 of the Code of Criminal Procedure, 1973 or before the
Special Judicial Magistrate 1st Class in the concerned court at the place of ULB.
12.
CAPACITY
BUILDING
AND
INFORMATION,
EDUCATION
AND
COMMUNICATION :
The ULBs should arrange training on the C&D Rules, bye-laws, HPSPCB guidelines and
any other relevant material to all relevant State Government officials to ensure they are aware of
the literature around C&D Waste management. Different training and awareness modules should be
prepared for various levels of government officials bearing in mind the nature of responsibilities
and inherent powers under relevant law. This would ensure maximum productivity and efficient use
of resources available with the State. The State Government should earmark adequate amounts for
training and capacity building of all levels of staff at regular intervals. This would depend on the
number of staff, length of training, external agencies involved in the training, location and
frequency of the training among other factors
Currently, there exists a lack of awareness among potential market players regarding
utilisation of C&D Waste products. The ULB should disseminate information regarding the use and
benefits of recycled C&D products among different stakeholders including members of the general
public. State agencies and private associations must devise strategies to improve awareness and
generate demand for C&D Waste based building material via white-papers, workshops, targeted
incentives for first-time users, etc. The ULB should widely publicize the sources from where the
recycled products can be procured.
There should be a separate section on management C&D Waste on the ULB website where
the information about C&D Waste including rules, policies, user fees, penalties, details of
collection centers/transit sites and processing facilities etc. are available, alongwith a list of
suggestions for waste minimization and an interactive section where useful ideas or experiences
can be uploaded and discussed. Incentives for use of recycled material should be publicized
through the website.
The ULB should use print and audio/visual media to sensitize the citizens especially
RWA’s about the issues arising out of C&D Waste being dumped at empty sites or along with other
types of waste. The numbers around per day generation and the magnitude of the problem should
be publicised and co-operation solicited from the citizens in handling the C&D Waste responsibly.
The fact that C&D Waste is a separate waste stream and the available disposal options should be
widely publicised using all the modes of mass communication available to the ULB. The ULB shall
collaborate with technical experts, non-governmental organisations and builder/developer
associations to build the IEC content and disseminate the information.
4227
jkti=] fgekpy izns'k] 30 tqykbZ] 2019@08 Jko.k] 1941
13.
GRIEVANCE REDRESSAL MECHANISM
For effective functioning of C&D Waste management systems, a robust complaint redressal
system is imperative. This system creates a platform for various stakeholders to voice their
complaints regarding C&D Waste management and is an additional monitoring mechanism for the
ULB. This system could be enabled through walk-in complaints, phone calls, SMS, online
complaints, through postal service and/or any other mechanism which the ULB may consider
appropriate keeping in mind the population, per capita income, available technologies and quantity
of C&D Waste generated. The ULB shall ensure that each grievance is redressed in a timely and
efficient manner bearing in mind the type of grievance, inconvenience caused to public and the
remedial action proposed to be taken. The ULB officials should make an area-wise periodic (daily,
weekly or monthly) report of the number and type of complaints received, action taken including
time taken, feedback of the complainant and pending complaints. This should be submitted to the
chief executive officer or commissioner of the ULB for review and necessary action. The details of
complaints received and action taken should also be available on the ULB website and its office
during working hours.
A toll free number may be set up for this purpose.
SCHEDULE—I: ILLUSTRATIVE RATES FOR USER FEES
PART—I –User Fees payable by Waste Generators except Bulk Waste Generators
Sl.No Type of Waste Generator
(excluding Bulk Waste
Generators)
User Fee per month from each Waste Generator to be
not less than
Population >
1.0 lakh
Population >= 0.5
lakhs and < 1.0
lakh
Population <
0.5 lakhs
1.
For
collection
and
transportation
of
C&D
Waste.
Rs. 30 per ton
per kilometre.
Rs. 30 per ton per
kilometre.
Rs. 20 per ton
per
Kilometer.
2.
For
processing/Land
Filling of C&D Waste at
the Sanitary Landfill.
Rs. 200 per ton
Rs. 200 per ton
Rs. 200 per ton
PART II – User Fees payable by Bulk Waste Generators
For Bulk Waste Generators who do not transport their own C&D Waste, User Fee shall be
Sl.No Type of service
User Fee per month from each Bulk Waste Generator
to be not less than
Population >
1.0
lakh
Population >= 0.5
lakhs and < 10
lakhs
Population <
0.5
lakhs
1.
For
collection
and
transportation
of
C&D
Waste.
Rs. 50 per ton
per kilometre.
Rs. 40 per ton per
kilometre.
Rs. 30 per ton
per kilometre.
2.
For
processing/Land
Filling of C&D Waste at
the Sanitary Landfill.
Rs. 200 per ton
Rs. 200 per ton
Rs. 200 per ton
4228
jkti=] fgekpy izns'k] 30 tqykbZ] 2019@08 Jko.k] 1941
SCHEDULE-II :— ILLUSTRATIVE PENALTIES FOR NON-COMPLIANCE
Sl.
No.
Offence
Bulk Waste Generator/
Service Provider (in
INR)
Small Waste
Generator
(in INR)
Transporter
(in INR)
1.
Dumping of construction
and demolition waste in
storm water drains, open
spaces and other non-
designated areas.
Rs. 5,000 per ton of
C&D Waste dumped
Minimum: Rs. 10,000/-.
Rs. 3,000 per
ton
of
C&D
Waste dumped.
3,000 per ton
of
C&D
Waste
dumped.
2.
Mixing of C&D Waste
with any other waste
steam.
4,000 per ton of C&D
Waste mixed.
3,000 per ton of
C&D
Waste
mixed.
3,000 per ton
of
C&D
Waste mixed.
3.
Failure
to
start
construction, demolition
or
renovation
works
without submission and
approval of the waste
management plan.
(i) 50,000 if
the
proposed built up
area
of
the
construction/infra-
structure is 3000
square feet or less.
(ii) For
constructions
having built up area
of 3000 square feet
or more, INR 5,000
for
every
100
square feet of built
up area.
N.A.
N.A.
4.
Deviations and/or non-
compliance
of
the
conditions of the waste
management plan.
(i) 50,000 if
the
proposed built up
area
of
the
construction/
infrastructure
is
3000 square feet or
less.
(ii) For
constructions
having built up area
of 3000 square feet
or more, INR 5,000
for
every
100
square feet of built
up area.
N.A.
N.A.
Note.— 1. In case the C&D Waste is less than 1.0 ton, the charges shall be levied proportionally.
2.
The above charges shall be enhanced @ 10% every year on the base price.
3.
The fee will be settled as per actual weight of C&D Waste at the plant site.
4229
jkti=] fgekpy izns'k] 30 tqykbZ] 2019@08 Jko.k] 1941
ANNEXURE-1
PUBLIC NOTICE
MANAGEMENT OF CONSTRUCTION AND DEMOLITION WASTE
NAME OF ULB......................
This is bring to the notice of the public residing in the jurisdiction of (Name of
ULB........................................................................................................... ) that Construction and
Demolition Waste should not be thrown or littered on the roads/public places. In case of generation
of Construction and Demolition Waste, the generator should contact online or in writing at the
office of (Name of ULB........... ) within three days of generation of waste for collection of waste by
giving such collection charges as notified by (Name of ULB................. ). After receiving
information in writing from the Generator, the ULB shall arrange to lift the C & D waste and
dispose it at a designated site by using its own resources or will deploy an agency for the same and
shall fill the trip sheet.
It is also brought to the notice of the public that every waste generator shall keep the
Construction and Demolition waste within their premises or get the waste deposited at collection
centre notified by (Name of ULB...........) or handed over it to the authorized agency and also ensure
that there is no littering or deposition of Construction and Demolition waste so as to prevent
obstruction to the traffic or the public or drains. This notice is published in compliance of the
provisions of the Construction and Demolition Waste Management Rules, 2016.
_____________
ANNEXURE-2/3
(Name of ULB........................................................)
Format for Registering the Information/Compliance on C&D Waste Generation
Information No. & Date:
______________________________
Complaint No. & Date :
______________________________
Name of the Person:
______________________________
Address & Contact No.
______________________________
Approximate quantity of C & D Waste: _____________________
Approximate no. of trips required to collect the Waste: ________
Collection Charges in Rs.
______________________________
Any other Information:
______________________________
Signature
Signature
C&D Waste Generator
ULBs Authority
4230
jkti=] fgekpy izns'k] 30 tqykbZ] 2019@08 Jko.k] 1941
ANNEXURE-4
(Name of ULB...................................................................................)
TRIP SHEET
(Filled in triplicate) SI. No _____________ Date:_________________
Complaint No. & Date:
Name of the Person:
Address & Contact No.:
Ward No.:
Vehicle No:
Vehicle Type:
Equipment used (Bob CAT/JCB):
No. of trips made:
Collection Charges in Rs. (paid earlier)
Balance Charges in Rs. (If any, to be paid)
Signature of Authorized Person
Signature of Authorised person
of Generator of C&D Waste.
of ULB/Agency.
Trip Sheet to be made in triplicate.
» One Copy to be retained by ULBs authorized person/agency.
» One Copy to be retained by the Generator of C & D Waste.
» One Copy to be submitted by the agency at ULB after lifting the C& D Waste duly signed
by the agency and the generators.
___________
TRANSPORT DEPARTMENT
NOTIFICATION
Shimla-2, the 26th July, 2019
No. TPT-C (9)-05/2003.—The Governor, Himachal Pradesh in exercise of the powers
conferred by sub-section (6) of Section-41 of the Motor Vehicles Act, 1988 (No. 59 of 1988) and
all other powers enabling him in this behalf is pleased to allot/release registration marks/number
from Serial No. 0001 to 9999 under the Registration marks HP 87A to Registering & Licensing
4231
jkti=] fgekpy izns'k] 30 tqykbZ] 2019@08 Jko.k] 1941
Authority Thunag District Mandi, Himachal Pradesh for registration of motor vehicles with effect
from the publication in the H. P. Rajpatra (Extra Ordinary) in the public interest.
By order,
JAGDISH CHANDER SHARMA,
Principal Secretary (Transport).
________
TRANSPORT DEPARTMENT
NOTIFICATION
Shimla-2, the 24th July, 2019
No. TPT-C (9)-1/2016-I.—The Governor, Himachal Pradesh in exercise of the powers
conferred by sub-section 14(3) of the Himachal Pradesh Motor Vehicle Taxation Act, 1972 (Act
No. 4 of 1973) and all other powers enabling him in this behalf is pleased to exempt the vehicle
No. HP 71-5635 which is registered in the name of Sh. Ranveer Singh s/o Sh. Jagat Ram, r/o
Village Dhagand, P. O. Chakli, Tehsil Nahan, District Sirmaur, Himachal Pradesh from the
payment of Special Road Tax levied under section-3 of the Himachal Pradesh Motor Vehicle
Taxation Act, 1972 w.e.f. 07-01-2011 to 31-08-2017 in public interest.
By order,
JAGDISH CHANDER SHARMA,
Principal Secretary (Transport).
____________
TRANSPORT DEPARTMENT
NOTIFICATION
Shimla-2, the 26th July, 2019
No. TPT-F (6)-1/2013-II-Loose.—The Governor, Himachal Pradesh in exercise of the
powers conferred by sub-section (6) of Section-41 of the Motor Vehicles Act, 1988 (No. 59 of
1988) and all other powers enabling him in this behalf is pleased to allot/release registration
marks/number from Serial No. 0001 to 9999 under the Registration marks HP63-E to Regional
Transport Officer Shimla, District Shimla, Himachal Pradesh for registration of motor vehicles with
effect from the publication in the H. P. Rajpatra (Extra Ordinary) in the public interest.
By order,
Sd/-
(JAGDISH CHANDER SHARMA),
Principal Secretary (Transport).
4232
jkti=] fgekpy izns'k] 30 tqykbZ] 2019@08 Jko.k] 1941
c vnkyr Jh Ñ".k pUn ;kno] lgk;d lekgrkZ f}rh; Js.kh] i/kj] rglhy i/kj]
ftyk e.Mh ¼fg0 iz0½
muoku eqdíek % 37¼2½
rkjh[k is'kh % 13&08&2019
lat; dqekj iq= Jh bUnz] fuoklh yksgMk] Mkd?kj dqQjh] rglhy i/kj] ftyk e.Mh] fg0 iz0
- - izkFkhZA
cuke
vke turk
- - izR;kFkhZA
b'rgkj jkti=
vkosnu&i= tsj /kkjk 37¼2½ ds vUrxZr uke n:Lr djus ckjkA
vkosnd lat; dqekj iq= Jh bUnz] fuoklh yksgMk] Mkd?kj dqQjh] rglhy i/kj] ftyk e.Mh]
fg0 iz0 us bl vnkyr esa vkosnu&i= xqtkjk gS fd mldk uke xzke iapk;r fjdkMZ] Ldwy izek.k&i= o
vk/kkj dkMZ esa latw uke ntZ gSA tcfd egky yksgM+k@545 ds reke Hkw0 jktLo vfHkys[k esa mldk uke
lat; dqekj ntZ gSA vkosnd us bl vnkyr ls izkFkZuk dh gS fd mldk uke lat; dqekj mQZ latw uke
ntZ djus ds fyf[kr vkns'k fn;s tkosaA
vr% bl b'rgkj }kjk vke turk dks lwfpr fd;k tkrk gS fd ;fn fdlh O;fDr dks mDr uke
ntZ djus ckjk dksbZ mtj@,rjkt gks rks og vlkyru ;k odkyru rkjh[k is'kh 13&08&2019 dks lqcg
10-00 cts gkftj gksdj viuk mtj is'k dj ldrk gSA clwjr xSjgkftj ,drjQk dk;Zokgh vey esa ykbZ
tkdj mfpr vkns'k ikfjr dj fn, tk,axsA
;g b'rgkj vkt fnukad 17&07&2019 dks esjs gLrk{kj o eksgj vnkyr ls tkjh gqvkA
eksgjA
Ñ".k pUn ;kno]
lgk;d lekgrkZ f}rh; Js.kh]
rglhy i/kj] ftyk e.Mh ¼fg0 iz0½A
&&&&&&&&&&&
c vnkyr Jh Ñ".k pUn ;kno] lgk;d lekgrkZ f}rh; Js.kh] i/kj] rglhy i/kj]
ftyk e.Mh ¼fg0 iz0½
muoku eqdíek % 37¼2½
rkjh[k is'kh % 13&08&2019
nsoh pUn iq= Jh xqjnkl] fuoklh pSgM+] Mkd?kj ikyh] rglhy i/kj] ftyk e.Mh] fg0 iz0
- - izkFkhZA
cuke
vke turk
- - izR;kFkhZA
b'rgkj jkti=
4233
jkti=] fgekpy izns'k] 30 tqykbZ] 2019@08 Jko.k] 1941
vkosnu&i= tsj /kkjk 37¼2½ ds vUrxZr uke n:Lr djus ckjkA
vkosnd nsoh pUn iq= Jh xqjnkl] fuoklh pSgM+] Mkd?kj ikyh] rglhy i/kj] ftyk e.Mh] fg0 iz0
us bl vnkyr esa vkosnu&i= xqtkjk gS fd mldk uke xzke iapk;r fjdkMZ esa nsoh pUn uke ntZ gSA
tcfd egky pSgM+@594 ds reke Hkw0 jktLo vfHkys[k esa mldk uke pUnze.kh ntZ gS tks xyr ntZ gqvk
gSA vkosnd us bl vnkyr ls izkFkZuk dh gS fd mldk uke pUnze.kh ds LFkku ij nsoh pUn mQZ pUnze.kh
uke ntZ djus ds fyf[kr vkns'k fn;s tkoasA
vr% bl b'rgkj }kjk vke turk dks lwfpr fd;k tkrk gS fd ;fn fdlh O;fDr dks mDr uke
ntZ djus ckjk dksbZ mtj@,rjkt gks rks og vlkyru ;k odkyru rkjh[k is'kh 13&08&2019 dks lqcg
10-00 cts gkftj gksdj viuk mtj is'k dj ldrk gSA clwjr xSjgkftj ,drjQk dk;Zokgh vey esa ykbZ
tkdj mfpr vkns'k ikfjr dj fn, tk,axsA
;g b'rgkj vkt fnukad 17&07&2019 dks esjs gLrk{kj o eksgj vnkyr ls tkjh gqvkA
eksgjA
Ñ".k pUn ;kno]
lgk;d lekgrkZ f}rh; Js.kh]
rglhy i/kj] ftyk e.Mh ¼fg0 iz0½A
&&&&&&&&&&&
c vnkyr Jh Ñ".k pUn ;kno] lgk;d lekgrkZ f}rh; Js.kh] i/kj] rglhy i/kj]
ftyk e.Mh ¼fg0 iz0½
muoku eqdíek % 37¼2½
rkjh[k is'kh % 13&08&2019
dyh jke iq= Lo0 Jh xqgryw] fuoklh gqjax] Mkd?kj dFkksx] rglhy i/kj] ftyk e.Mh] fg0 iz0
- - izkFkhZA
cuke
vke turk
- - izR;kFkhZA
b'rgkj jkti=
vkosnu&i= tsj /kkjk 37¼2½ ds vUrxZr uke n:Lr djus ckjkA
vkosnd dyh jke iq= Lo0 Jh xqgryw] fuoklh gqjax] Mkd?kj dFkksx] rglhy i/kj] ftyk e.Mh]
fg0 iz0 us bl vnkyr esa vkosnu&i= xqtkjk gS fd mlds e`rd firk dk uke egky gqjax@488 o
vkyax@478 ds reke Hkw0 jktLo vfHkys[k esa elrw ntZ gS tks xyr ntZ gqvk gSA tcfd mlds e`Rkd
firk dk uke xzke iapk;r dFkksx ds fjdkMZ esa xqgryw ntZ gS tks lgh ntZ gSA vkosnd us bl vnkyr ls
izkFkZuk dh gS fd mlds e`rd firk dk uke elrw ds LFkku ij xqgryw ntZ djus ds fyf[kr vkns'k fn;s
tkosaA
vr% bl b'rgkj }kjk vke turk dks lwfpr fd;k tkrk gS fd ;fn fdlh O;fDr dks mDr uke
ntZ djus ckjk dksbZ mtj@,rjkt gks rks og vlkyru ;k odkyru rkjh[k is'kh 13&08&2019 dks lqcg
10-00 cts gkftj gksdj viuk mtj is'k dj ldrk gSA clwjr xSjgkftj ,drjQk dk;Zokgh vey esa ykbZ
tkdj mfpr vkns'k ikfjr dj fn, tk,axsA
4234
jkti=] fgekpy izns'k] 30 tqykbZ] 2019@08 Jko.k] 1941
;g b'rgkj vkt fnukad 17&07&2019 dks esjs gLrk{kj o eksgj vnkyr ls tkjh gqvkA
eksgjA
Ñ".k pUn ;kno]
lgk;d lekgrkZ f}rh; Js.kh]
rglhy i/kj] ftyk e.Mh ¼fg0 iz0½A
&&&&&&&&&
c vnkyr lgk;d lekgrkZ izFke Js.kh] rglhy ckyhpkSdh] ftyk e.Mh ¼fg0 iz0½
fely uEcj % 01@05&01&2019
Jh uksrk jke iq= Jh 'ksrq] fuoklh xkao ckM+h] Mkd?kj f'kokonkj] rglhy lnj] ftyk e.Mh
¼fg0 iz0½A
cuke
vke turk
fo"k;-&&jktLo fjdkMZ esa uke n#Lrh ckjs vkosnu&i=A
Jh uksrk jke iq= Jh 'ksrq] fuoklh xkao ckM+h] Mkd?kj f'kokonkj] rglhy lnj] ftyk e.Mh
¼fg0 iz0½ us ,d vkosnu&i= e; 'kiFk&i= bl vk'k; ds lkFk xqtkjk gS fd mldk uke xzke iapk;r
ukx/kkj] fodkl [k.M lnj] ftyk e.Mh ds fjdkMZ esa uksrk jke ntZ gS] ysfdu jktLo foHkkx ds fjdkMZ
egky MksHkk@587] tekcUnh lky 2017&2018 esa xyrh ls vkosnd dk uke ;qf/k"Vj ntZ gqvk gSA izkFkhZ
vc jktLo fjdkMZ esa xzke iapk;r ukx/kkj ds fjdkMZ ds vk/kkj ij viuk uke uksrk jke ntZ djokuk
pkgrk gSA
vr% bl b'rgkj }kjk loZlk/kkj.k turk o fgrc) O;fDr;ksa dks lwfpr fd;k tkrk gS fd
mijksDr uke dks n#Lr djus ckjs fdlh Hkh O;fDr dks dksbZ vkifŸk gks rks og fnukad 19&08&2019 dks
;k blls iwoZ v/kksgLrk{kjh ds le{k vlkyru ;k odkyru mifLFkr gksdj viuh vkifŸk ntZ dj ldrk
gSA blds i'pkr~ dksbZ Hkh ,rjkt dkfcys lek;r ugha gksxk rFkk vkosnu&i= ij fu;ekuqlkj dk;Zokgh
vey esa ykbZ tk,xhA
vkt fnukad 11&07&2019 dks esjs gLrk{kj o eksgj vnkyr }kjk tkjh gqvkA
eksgjA
gLrk{kfjr@&
lgk;d lekgrkZ izFke Js.kh]
rglhy ckyhpkSdh] ftyk e.Mh ¼fg0 iz0½A
&&&&&&&
c vnkyr lgk;d lekgrkZ izFke Js.kh] rglhy ckyhpkSdh] ftyk e.Mh ¼fg0 iz0½
fely uEcj % 26@05&11&2018
Jh Hkksys jke iq= Jh ujk;.k flag] fuoklh xkao Nekj] Mkd?kj egksxh] rglhy ckyhpkSdh] ftyk
e.Mh ¼fg0 iz0½A
cuke
4235
jkti=] fgekpy izns'k] 30 tqykbZ] 2019@08 Jko.k] 1941
vke turk
fo"k;-&&jktLo fjdkMZ esa uke n#Lrh ckjs vkosnu&i=A
Jh Hkksys jke iq= Jh ujk;.k flag] fuoklh xkao Nekj] Mkd?kj egksxh] rglhy ckyhpkSdh] ftyk
e.Mh ¼fg0 iz0½ us ,d vkosnu&i= e; 'kiFk&i= bl vk'k; ds lkFk xqtkjk gS fd mlds firk ds nknk
dk uke xzke iapk;r [kksykuky ds fjdkMZ esa Qkx.kw ntZ gS ysfdu jktLo foHkkx ds fjdkMZ egky
'kSguw@551] tekcUnh lky 2011&2012 esa xyrh ls vkosnd ds firk ds nknk dk uke ek?kw ntZ gqvk gSA
izkFkhZ vc jktLo fjdkMZ esa xzke iapk;r [kksykuky ds fjdkMZ ds vk/kkj ij vius firk ds nknk dk uke
Qkx.kw ntZ djokuk pkgrk gSA
vr% bl b'rgkj }kjk loZlk/kkj.k turk o fgrc) O;fDr;ksa dks lwfpr fd;k tkrk gS fd
mijksDr uke dks n#Lr djus ckjs fdlh Hkh O;fDr dks dksbZ vkifŸk gks rks og fnukad 19&08&2019 dks
;k blls iwoZ v/kksgLrk{kjh ds le{k vlkyru ;k odkyru mifLFkr gksdj viuh vkifŸk ntZ dj ldrk
gSA blds i'pkr~ dksbZ Hkh ,rjkt dkfcys lek;r ugha gksxk rFkk vkosnu&i= ij fu;ekuqlkj dk;Zokgh
vey esa ykbZ tk,xhA
vkt fnukad 11&07&2019 dks esjs gLrk{kj o eksgj vnkyr }kjk tkjh gqvkA
eksgjA
gLrk{kfjr@&
lgk;d lekgrkZ izFke Js.kh]
rglhy ckyhpkSdh] ftyk e.Mh ¼fg0 iz0½A
&&&&&&&
c vnkyr lgk;d lekgrkZ izFke Js.kh] rglhy ckyhpkSdh] ftyk e.Mh ¼fg0 iz0½
fely uEcj % 06@05&03&2019
Jherh fnus'ojh iRuh Jh ehj pUn] fuoklh xkao ?kkV eqgkFk] Mkd?kj iatkbZ+] rglhy ckyhpkSdh]
ftyk e.Mh ¼fg0 iz0½A
cuke
vke turk
fo"k;-&&jktLo fjdkMZ esa uke n#Lrh ckjs vkosnu&i= A
Jherh fnus'ojh iRuh Jh ehj pUn] fuoklh xkao ?kkV eqgkFk] Mkd?kj iatkbZ+] rglhy ckyhpkSdh]
ftyk e.Mh ¼fg0 iz0½ us ,d vkosnu&i= e; 'kiFk&i= bl vk'k; ds lkFk xqtkjk gS fd mldk uke
xzke iapk;r nso/kkj ds fjdkMZ esa Jherh fnus'ojh ntZ gS ysfdu jktLo foHkkx ds fjdkMZ egky
nnokl@576] iVokj o`Ùk Fkkph esa vkosfndk dk uke xyrh ls Jherh /kus'ojh ntZ gqvk gSA vc izkfFkZuh
jktLo fjdkMZ esa xzke iapk;r nso/kkj ds fjdkMZ ds vk/kkj ij viuk uke Jherh fnus'ojh ntZ djokuk
pkgrh gSA
vr% bl b'rgkj }kjk loZlk/kkj.k turk o fgrc) O;fDr;ksa dks lwfpr fd;k tkrk gS fd
mijksDr uke dks n#Lr djus ckjs fdlh Hkh O;fDr dks dksbZ vkifŸk gks rks og fnukad 19&08&2019 dks
;k blls iwoZ v/kksgLrk{kjh ds le{k vlkyru ;k odkyru mifLFkr gksdj viuh vkifŸk ntZ dj ldrk
gSA blds i'pkr~ dksbZ Hkh ,rjkt dkfcys lek;r ugha gksxk rFkk vkosnu&i= ij fu;ekuqlkj dk;Zokgh
vey esa ykbZ tk,xhA
4236
jkti=] fgekpy izns'k] 30 tqykbZ] 2019@08 Jko.k] 1941
vkt fnukad 11&07&2019 dks esjs gLrk{kj o eksgj vnkyr }kjk tkjh gqvkA
eksgjA
gLrk{kfjr@&
lgk;d lekgrkZ izFke Js.kh]
rglhy ckyhpkSdh] ftyk e.Mh ¼fg0 iz0½A
&&&&&&&
c vnkyr lgk;d lekgrkZ izFke Js.kh] rglhy ckyhpkSdh] ftyk e.Mh ¼fg0 iz0½
fely uEcj % 08@15&03&2019
Jh Mksys jke iq= Jh Hkxr jke] fuoklh xkao iukyh] Mkd?kj ykjth] rglhy ckyhpkSdh] ftyk
e.Mh ¼fg0 iz0½A
cuke
vke turk
fo"k;-&&jktLo fjdkMZ esa uke n#Lrh ckjs vkosnu&i=A
Jh Mksys jke iq= Jh Hkxr jke] fuoklh xkao iukyh] Mkd?kj ykjth] rglhy ckyhpkSdh] ftyk
e.Mh ¼fg0 iz0½ us ,d vkosnu&i= e; 'kiFk&i= bl vk'k; ds lkFk xqtkjk gS fd mldk uke xzke
iapk;r dkm ds fjdkMZ esa Mksys jke ntZ gS ysfdu jktLo foHkkx ds fjdkMZ egky eqgyw [kejk/kk@596]
tekcUnh lky 2015&2016 esa xyrh ls vkosnd dk uke Mksyk jke ntZ gqvk gSA izkFkhZ vc jktLo fjdkMZ
esa xzke iapk;r dkm ds fjdkMZ ds vk/kkj ij viuk uke Mksys jke ntZ djokuk pkgrk gSA
vr% bl b'rgkj }kjk loZlk/kkj.k turk o fgrc) O;fDr;ksa dks lwfpr fd;k tkrk gS fd
mijksDr uke dks n#Lr djus ckjs fdlh Hkh O;fDr dks dksbZ vkifŸk gks rks og fnukad 19&08&2019 dks
;k blls iwoZ v/kksgLrk{kjh ds le{k vlkyru ;k odkyru mifLFkr gksdj viuh vkifŸk ntZ dj ldrk
gSA blds i'pkr~ dksbZ Hkh ,rjkt dkfcys lek;r ugha gksxk rFkk vkosnu&i= ij fu;ekuqlkj dk;Zokgh
vey esa ykbZ tk,xhA
vkt fnukad 11&07&2019 dks esjs gLrk{kj o eksgj vnkyr }kjk tkjh gqvkA
eksgjA
gLrk{kfjr@&
lgk;d lekgrkZ izFke Js.kh]
rglhy ckyhpkSdh] ftyk e.Mh ¼fg0 iz0½A
&&&&&&&
c vnkyr lgk;d lekgrkZ izFke Js.kh] rglhy ckyhpkSdh] ftyk e.Mh ¼fg0 iz0½
fely uEcj % 07@15&03&2019
Jh ;ojkt iq= Jh eksgu yky] fuoklh xkao 'kkykxkM+] Mkd?kj Fkkph] rglhy ckyhpkSdh] ftyk
e.Mh ¼fg0 iz0½A
cuke
vke turk
fo"k;-&&jktLo fjdkMZ esa uke n#Lrh ckjs vkosnu&i=A
4237
jkti=] fgekpy izns'k] 30 tqykbZ] 2019@08 Jko.k] 1941
Jh ;ojkt iq= Jh eksgu yky] fuoklh xkao 'kkykxkM+] Mkd?kj Fkkph] rglhy ckyhpkSdh] ftyk
e.Mh ¼fg0 iz0½ us ,d vkosnu&i= e; 'kiFk&i= bl vk'k; ds lkFk xqtkjk gS fd mldk uke xzke
iapk;r Fkkph ds fjdkMZ esa ;ojkt ntZ gS ysfdu jktLo foHkkx ds fjdkMZ egky fc>j@580] tekcUnh
lky 2017&2018 esa xyrh ls vkosnd dk uke jktw ntZ gqvk gSA izkFkhZ vc jktLo fjdkMZ esa xzke iapk;r
Fkkph ds fjdkMZ ds vk/kkj ij viuk uke ;ojkt ntZ djokuk pkgrk gSA
vr% bl b'rgkj }kjk loZlk/kkj.k turk o fgrc) O;fDr;ksa dks lwfpr fd;k tkrk gS fd
mijksDr uke dks n#Lr djus ckjs fdlh Hkh O;fDr dks dksbZ vkifŸk gks rks og fnukad 19&08&2019 dks
;k blls iwoZ v/kksgLrk{kjh ds le{k vlkyru ;k odkyru mifLFkr gksdj viuh vkifŸk ntZ dj ldrk
gSA blds i'pkr~ dksbZ Hkh ,rjkt dkfcys lek;r ugha gksxk rFkk vkosnu&i= ij fu;ekuqlkj dk;Zokgh
vey esa ykbZ tk,xhA
vkt fnukad 11&07&2019 dks esjs gLrk{kj o eksgj vnkyr }kjk tkjh gqvkA
eksgjA
gLrk{kfjr@&
lgk;d lekgrkZ izFke Js.kh]
rglhy ckyhpkSdh] ftyk e.Mh ¼fg0 iz0½A
&&&&&&&
c vnkyr dk;Zdkjh n.Mkf/kdkjh] rglhy ckyhpkSdh] ftyk e.Mh ¼fg0 iz0½
fely uEcj % 16@06&07&2019
Jh eksgu yky iq= Jh fM.kw jke] fuoklh xkao olwV] Mkd?kj Fkkph] rglhy ckyhpkSdh] ftyk
e.Mh ¼fg0 iz0½A
cuke
vke turk
fo"k;-&&izkFkZuk&i= tsj /kkjk 13¼3½ tUe ,oa e`R;q iathdj.k vf/kfu;e] 1969 o fgekpy izns'k tUe ,oa
e`R;q vf/kfu;e] 1978-
Jh eksgu yky iq= Jh fM.kw jke] fuoklh xkao olwV] Mkd?kj Fkkph] rglhy ckyhpkSdh] ftyk
e.Mh ¼fg0 iz0½ us ,d vkosnu&i= e; 'kiFk&i= bl vk'k; ds lkFk xqtkjk gS fd mldh nknh Jherh
'kqdjh nsoh dh e`R;q fnukad 27&08&1986 dks gqbZ gS] ijUrq vKkurko'k mldh e`R;q dks xzke iapk;r
Fkkph esa ntZ u djok;k tk ldk gSA vc og viuh nknh dh e`R;q dk iathdj.k xzke iapk;r Fkkph ds
fjdkMZ esa ntZ djokuk pkgrk gSA
vr% bl b'rgkj }kjk loZlk/kkj.k turk o fgrc) O;fDr;ksa dks lwfpr fd;k tkrk gS fd izkFkhZ
dh nknh Jherh 'kqdjh nsoh dh e`R;q ds iathdj.k dks lEcfU/kr xzke iapk;r ds fjdkMZ esa ntZ djus ckjs
;fn fdlh dks dksbZ ,rjkt gks rks og fnukad 19&08&2019 rd bl vnkyr esa vlkyru ;k odkyru
gkftj gksdj viuh vkifÙk ntZ djok ldrk gSA blds i'pkr~ dksbZ Hkh ,rjkt dkfcys lek;r ugha gksxk
rFkk vkosnu&i= ij fu;ekuqlkj dk;Zokgh vey esa ykbZ tk,xhA
vkt fnukad 11&07&2019 dks esjs gLrk{kj o eksgj lfgr vnkyr }kjk tkjh gqvkA
eksgjA
gLrk{kfjr@&
dk;Zdkjh n.Mkf/kdkjh]
rglhy ckyhpkSdh] ftyk e.Mh ¼fg0 iz0½A
4238
jkti=] fgekpy izns'k] 30 tqykbZ] 2019@08 Jko.k] 1941
le{k Jh izohu dqekj] rglhynkj ,oe~ dk;Zdkjh n.Mkf/kdkjh] yMHkM+ksy]
ftyk e.Mh ¼fg0 iz0½
rkjh[k is'kh % 27&08&2019
Jh /kzeZUnz flag iq= Lokeh jke] fuoklh xkao xoSyk] Mkd?kj o rglhy yMHkM+ksy] ftyk e.Mh
¼fg0 iz0½
- - izkFkhZA
cuke
vke turk
- - Qjhdnks;eA
izkFkZuk&i= tsj /kkjk 13¼3½ tUe ,oa e`R;q iathdj.k vf/kfu;e] 1969 cjk, ntZ djus tUe@e`R;q
frfFkA
Jh /kzeZUnz flag iq= Lokeh jke] fuoklh xkao xoSyk] Mkd?kj o rglhy yMHkM+ksy] ftyk e.Mh
¼fg0 iz0½ us 'kiFk&i= lfgr vkosnu fd;k gS fd izkFkhZ ds iq= fo'kky dqekj dh okLrfod tUe frfFk
15&04&2014 gS] ijUrq izkFkhZ ds iq= fo'kky dqekj dh tUe frfFk 15&04&2014 xzke iapk;r HkMksy ds
tUe vfHkys[k esa ntZ ugha gqbZ gSA vc izkFkhZ us vius iq= dh tUe frfFk dks ntZ djus gsrq vkosnu fd;k
gSA
vr% bl b'rgkj ds ek/;e ls loZlk/kkj.k dks lwfpr fd;k tkrk gS fd ;fn fdlh O;fDr dks
mDr tUe frfFk 15&04&2014 dks ntZ djus ckjk dksbZ mtj@,rjkt gks rks og fnukad 27&08&2019 dks
vlkyru ;k odkyru bl U;k;ky; esa mifLFkr gksdj viuk mtj@,rjkt is'k djsa] vU;Fkk xSjgkftj
dh lwjr eas ,drjQk dk;Zokgh vey esa ykbZ tk,xhA
;g b'rgkj vkt fnukad 16&07&2019 dks esjs gLrk{kj o eksgj lfgr vnkyr ls tkjh gqvkA
eksgjA
gLrk{kfjr@&
rglhynkj ,oe~ dk;Zdkjh n.Mkf/kdkjh]
yMHkM+ksy] ftyk e.Mh ¼fg0 iz0½A
&&&&&&&
le{k Jh izohu dqekj] rglhynkj ,oe~ dk;Zdkjh n.Mkf/kdkjh] yMHkM+ksy]
ftyk e.Mh ¼fg0 iz0½
rkjh[k is'kh % 20&08&2019
Jherh lSuk nsoh iRuh Lo0 Jh izse flag] fuoklh xkao xoSyk] Mkd?kj o rglhy yMHkM+ksy] ftyk
e.Mh ¼fg0 iz0½
- - izkfFkZuA
cuke
vke turk
- - Qjhdnks;eA
izkFkZuk&i= tsj /kkjk 13¼3½ tUe ,oa e`R;q iathdj.k vf/kfu;e] 1969 cjk, ntZ djus tUe@e`R;q
frfFkA
Jherh lSuk nsoh iRuh Lo0 Jh izse flag] fuoklh xkao xoSyk] Mkd?kj o rglhy yMHkM+ksy] ftyk
e.Mh ¼fg0 iz0½ us 'kiFk&i= lfgr vkosnu fd;k gS fd izkfFkZu ds ifr dh e`R;q fnukad 09&09&2002 dks
gks pqdh gS] ijUrq izkfFkZu ds ifr dh e`R;q frfFk 09&09&2002 xzke iapk;r HkMksy ds e`R;q vfHkys[k esa ntZ
ugha gqbZ gSA vc izkfFkZu us vius ifr dh e`R;q frfFk dks ntZ djus gsrq vkosnu fd;k gSA
4239
jkti=] fgekpy izns'k] 30 tqykbZ] 2019@08 Jko.k] 1941
vr% bl b'rgkj ds ek/;e ls loZlk/kkj.k dks lwfpr fd;k tkrk gS fd ;fn fdlh O;fDr dks
mDr e`R;q frfFk dks ntZ djus ckjk dksbZ mtj@,rjkt gks rks og fnukad 20&08&2019 dks vlkyru ;k
odkyru bl U;k;ky; esa mifLFkr gksdj viuk mtj@,rjkt is'k djsa] vU;Fkk xSjgkftj dh lwjr eas
,drjQk dk;Zokgh vey esa ykbZ tk,xhA
;g b'rgkj vkt fnukad 16&07&2019 dks esjs gLrk{kj o eksgj lfgr vnkyr ls tkjh gqvkA
eksgjA
gLrk{kfjr@&
rglhynkj ,oe~ dk;Zdkjh n.Mkf/kdkjh]
yMHkM+ksy] ftyk e.Mh ¼fg0 iz0½A
&&&&&&&
le{k Jh izohu dqekj] rglhynkj ,oe~ lgk;d lekgrkZ izFke Js.kh] yMHkM+ksy]
ftyk e.Mh ¼fg0 iz0½
rkjh[k is'kh % 27&08&2019
Jh lqHkk"k pUn Hkykfj;k iq= Jh /keZ flag] fuoklh lkSa jksiMw] Mkd?kj clkSuk] rglhy yMHkM+ksy]
ftyk e.Mh ¼fg0 iz0½
- - izkFkhZA
cuke
vke turk
- - Qjhdnks;eA
Jh lqHkk"k pUn Hkykfj;k iq= Jh /keZ flag] fuoklh lkSa jksiMw] Mkd?kj clkSuk] rglhy yMHkM+ksy]
ftyk e.Mh ¼fg0 iz0½ us 'kiFk&i= lfgr vkosnu fd;k gS fd izkFkhZ dk okLrfod uke lqHkk"k pUn
Hkykfj;k gS] ijUrq izkFkhZ dk uke jktLo vfHkys[k egky lkSa esa lqHkk"k pUn ntZ gks pqdk gS tksfd xyr gSA
vc izkFkhZ us vius uke dh n#Lrh ds vkns'k pkgs gSaA
vr% bl b'rgkj }kjk vke turk dks lwfpr fd;k tkrk gS fd ;fn fdlh O;fDr dks mDr uke
n#Lrh djus ckjk dksbZ mtj@,rjkt gks rks og vlkyru ;k odkyru rkjh[k is'kh 27&08&2019 dks
10-00 cts bl vnkyr esa gkftj gksdj viuk mtj@,rjkt is'k dj ldrk gSA clwjr xSjgkftj
,drjQk dk;Zokgh vey esa ykbZ tkdj uke n#Lrh djus ds vkns'k ikfjr dj fn, tk,axsA
;g b'rgkj vkt fnukad 16&07&2019 dks esjs gLrk{kj o eksgj lfgr vnkyr ls tkjh gqvkA
eksgjA
gLrk{kfjr@&
lgk;d lekgrkZ izFke Js.kh]
yMHkM+ksy] ftyk e.Mh ¼fg0 iz0½A
&&&&&&&
le{k Jh izohu dqekj] rglhynkj ,oe~ lgk;d lekgrkZ izFke Js.kh] yMHkM+ksy]
ftyk e.Mh ¼fg0 iz0½
rkjh[k is'kh % 20&08&2019
Jh f=yksd ukFk iq= Jh fj[kh] fuoklh xkao dkyk vEc] rglhy yMHkM+ksy] ftyk e.Mh ¼fg0iz0½
- - izkFkhZA
4240
jkti=] fgekpy izns'k] 30 tqykbZ] 2019@08 Jko.k] 1941
cuke
vke turk
- - Qjhdnks;eA
Jh f=yksd ukFk iq= Jh fj[kh] fuoklh xkao dkyk vEc] rglhy yMHkM+ksy] ftyk e.Mh ¼fg0 iz0½
us 'kiFk&i= lfgr vkosnu fd;k gS fd izkFkhZ dk okLrfod uke f=yksd ukFk gS] ijUrq izkFkhZ dk uke
jktLo vfHkys[k egky dkyk vEc esa f=yksd pUn ntZ gks pqdk gS tksfd xyr gSA vc izkFkhZ us vius uke
dh n#Lrh ds vkns'k pkgs gSaA
vr% bl b'rgkj }kjk vke turk dks lwfpr fd;k tkrk gS fd ;fn fdlh O;fDr dks mDr uke
n#Lrh djus ckjk dksbZ mtj@,rjkt gks rks og vlkyru ;k odkyru rkjh[k is'kh 20&08&2019 dks
10-00 cts bl vnkyr esa gkftj gksdj viuk mtj@,rjkt is'k dj ldrk gSA clwjr xSjgkftj
,drjQk dk;Zokgh vey esa ykbZ tkdj uke n#Lrh ntZ djus ds vkns'k ikfjr dj fn, tk,axsA
;g b'rgkj vkt fnukad 16&07&2019 dks esjs gLrk{kj o eksgj lfgr vnkyr ls tkjh gqvkA
eksgjA
gLrk{kfjr@&
lgk;d lekgrkZ izFke Js.kh]
yMHkM+ksy] ftyk e.Mh ¼fg0 iz0½A
&&&&&&&
le{k Jh izohu dqekj] rglhynkj ,oe~ lgk;d lekgrkZ izFke Js.kh] yMHkM+ksy]
ftyk e.Mh ¼fg0 iz0½
rkjh[k is'kh % 20&08&2019
Jh eLr jke iq= Jh izHkw jke] fuoklh xkao iuh:] rglhy yMHkM+ksy] ftyk e.Mh ¼fg0iz0½
- - izkFkhZA
cuke
vke turk
- - Qjhdnks;eA
Jh eLr jke iq= Jh izHkw jke] fuoklh xkao iuh:] rglhy yMHkM+ksy] ftyk e.Mh ¼fg0iz0½ us
'kiFk&i= lfgr vkosnu fd;k gS fd izkFkhZ dk okLrfod uke eLr jke gS] ijUrq izkFkhZ dk uke jktLo
vfHkys[k egky iuh: esa eLrks ntZ gks pqdk gS tksfd xyr gSA vc izkFkhZ us vius uke dh n#Lrh ds
vkns'k pkgs gSaA
vr% bl b'rgkj }kjk vke turk dks lwfpr fd;k tkrk gS fd ;fn fdlh O;fDr dks mDr uke
n#Lrh djus ckjk dksbZ mtj@,rjkt gks rks og vlkyru ;k odkyru rkjh[k is'kh 20&08&2019 dks
10-00 cts bl vnkyr esa gkftj gksdj viuk mtj@,rjkt is'k dj ldrk gSA clwjr xSjgkftj
,drjQk dk;Zokgh vey esa ykbZ tkdj uke n#Lrh ntZ djus ds vkns'k ikfjr dj fn, tk,axsA
;g b'rgkj vkt fnukad 16&07&2019 dks esjs gLrk{kj o eksgj lfgr vnkyr ls tkjh gqvkA
eksgjA
gLrk{kfjr@&
lgk;d lekgrkZ izFke Js.kh]
yMHkM+ksy] ftyk e.Mh ¼fg0 iz0½A
4241
jkti=] fgekpy izns'k] 30 tqykbZ] 2019@08 Jko.k] 1941
le{k Jh izohu dqekj] rglhynkj ,oe~ lgk;d lekgrkZ izFke Js.kh] yMHkM+ksy]
ftyk e.Mh ¼fg0 iz0½
rkjh[k is'kh % 20&08&2019
Jherh lkfo=h nsoh iRuh Lo0 Jh lqjtu flag] fuoklh egky fpEguw] xkao ukxu] rglhy
tksfxUnjuxj] ftyk e.Mh ¼fg0iz0½
- - izkfFkZuA
cuke
vke turk
- - Qjhdnks;eA
Jherh lkfo=h nsoh iRuh Lo0 Jh lqjtu flag] fuoklh egky fpEguw] xkao ukxu] rglhy
tksfxUnjuxj] ftyk e.Mh ¼fg0iz0½ us 'kiFk&i= lfgr vkosnu fd;k gS fd izkfFkZu dk okLrfod uke
lkfo=h nsoh gS] ijUrq izkfFkZu ds ek;ds rglhy yMHkMksy ds jktLo vfHkys[k egky dksBh o egky iV~Vk
esa izkfFkZu dk uke xqM~Mh nsoh ntZ gks pqdk gS tksfd xyr gSA vc izkfFkZu us vius uke dh n#Lrh ds
vkns'k pkgs gSaA
vr% bl b'rgkj }kjk vke turk dks lwfpr fd;k tkrk gS fd ;fn fdlh O;fDr dks mDr uke
n#Lrh djus ckjk dksbZ mtj@,rjkt gks rks og vlkyru ;k odkyru rkjh[k is'kh 20&08&2019 dks
10-00 cts bl vnkyr esa gkftj gksdj viuk mtj@,rjkt is'k dj ldrk gSA clwjr xSjgkftj
,drjQk dk;Zokgh vey esa ykbZ tkdj uke n#Lrh djus ds vkns'k ikfjr dj fn, tk,axsA
;g b'rgkj vkt fnukad 16&07&2019 dks esjs gLrk{kj o eksgj lfgr vnkyr ls tkjh gqvkA
eksgjA
gLrk{kfjr@&
lgk;d lekgrkZ izFke Js.kh]
yMHkM+ksy] ftyk e.Mh ¼fg0 iz0½A
&&&&&&&
le{k Jh izohu dqekj] rglhynkj ,oe~ lgk;d lekgrkZ izFke Js.kh] yMHkM+ksy]
ftyk e.Mh ¼fg0 iz0½
Jherh 'kdqUryk nsoh iq=h nhik miuke nsok] fuoklh cYg&1] Mkd?kj cYg Dokj] rglhy
yMHkMksy] ftyk e.Mh ¼fg0iz0½
- - izkfFkZuA
cuke
vke turk
- - Qjhdnks;eA
Jherh 'kdqUryk nsoh iq=h nhik miuke nsok] fuoklh cYg&1] Mkd?kj cYg Dokj] rglhy
yMHkMksy] ftyk e.Mh ¼fg0iz0½ us 'kiFk&i= lfgr vkosnu fd;k gS fd izkfFkZu dk okLrfod uke
'kdqUryk nsoh gS] ijUrq izkfFkZu dk uke jktLo vfHkys[k egky cYg&1 esa ccyh nsoh ntZ gks pqdk gS tksfd
xyr gSA vc izkfFkZu us vius uke dh n#Lrh ds vkns'k pkgs gSaA
vr% bl b'rgkj }kjk vke turk dks lwfpr fd;k tkrk gS fd ;fn fdlh O;fDr dks mDr uke
n#Lrh djus ckjk dksbZ mtj@,rjkt gks rks og vlkyru ;k odkyru rkjh[k is'kh 27&08&2019 dks
10-00 cts bl vnkyr esa gkftj gksdj viuk mtj@,rjkt is'k dj ldrk gSA clwjr xSjgkftj
,drjQk dk;Zokgh vey esa ykbZ tkdj uke n#Lrh djus dk vkns'k ikfjr dj fn;k tk,xkA
;g b'rgkj vkt fnukad 16&07&2019 dks esjs gLrk{kj o eksgj lfgr vnkyr ls tkjh gqvkA
eksgjA
gLrk{kfjr@&
lgk;d lekgrkZ izFke Js.kh]
yMHkM+ksy] ftyk e.Mh ¼fg0 iz0½A
4242
jkti=] fgekpy izns'k] 30 tqykbZ] 2019@08 Jko.k] 1941
c vnkyr dk;Zdkjh n.Mkf/kdkjh] tqCcy] ftyk f'keyk] fgekpy izns'k
Jh eksrh yky iq= Jh xaxk nÙk] fuoklh xzke cVkM+] Mkd?kj dBklw] rglhy tqCcy] ftyk f'keyk]
fg0 iz0
- - izkFkhZA
cuke
vke turk
muoku eqdíek-&&nj[okLr tsj /kkjk 13¼3½ tUe ,oa e`R;q iathdj.k vf/kfu;e] 1969 ds vUrxZrA
bl dk;kZy; esa Jh eksrh yky iq= Jh xaxk nÙk] fuoklh xzke cVkM+] Mkd?kj dBklw] rglhy
tqCcy] ftyk f'keyk] fg0 iz0 dk izkFkZuk&i= tks vfrfjDr ftyk jftLVªkj tUe ,oa e`R;q f'keyk] ftyk
f'keyk ds ek/;e ls bl dk;kZy; esas izkIr gqvk gS ftlesa vkxzg fd;k x;k gS fd izkFkhZ dh iq=h dk uke
fiz;k o tUe frfFk 09&02&2005 gS tks vHkh rd fdlh Hkh iapk;r esa iathÑr ugha gSA ftlds dkj.k
izkFkhZ dks viuh iq=h dk vk;q izek.k&i= tkjh djokus esa dfBukbZ vk jgh gSA izkFkhZ viuh iq=h dk
iathdj.k xzke iapk;r dBklw esa ntZ djokuk pkgrk gSA
vr% bl b'rgkj ds ek/;e ls loZlk/kkj.k dks lwfpr fd;k tkrk gS fd ;fn fdlh dks Hkh mi;qZDr
izkFkhZ dh iq=h dk uke o tUe frfFk dk bUnzkt xzke iapk;r dBklw esa ntZ djus ckjs dksbZ Hkh mtj o
,rjkt gks rks og fnukad 21&08&2019 dks ;k blls iwoZ vnkyr gtk esa gkftj gksdj fyf[kr o ekSf[kd
,rjkt izLrqr djsaA ;fn mDr rkjh[k rd dksbZ Hkh mtj o ,rjkt izLrqr u gqvk rks ;g le>k tk,xk
fd izkFkhZ dh iq=h fiz;k ds uke o tUe frfFk iathdj.k gsrq fdlh dks dksbZ vkifÙk ugha gS rFkk xzke
iapk;r dBklw dks tUe frfFk ntZ djus ds vkns'k ikfjr fd, tkosaxsA
vkt fnukad 23&07&2019 dks gekjs gLrk{kj o eksgj vnkyr ls tkjh gqvkA
eksgjA
gLrk{kfjr@&
dk;Zdkjh n.Mkf/kdkjh]
tqCcy] ftyk f'keyk ¼fg0 iz0½A
&&&&&&&&
c vnkyr dk;Zdkjh n.Mkf/kdkjh] tqCcy] ftyk f'keyk] fgekpy izns'k
Jherh lqpSrk iq=h Jh izkx jke] fuoklh xkao o Mkd?kj /kkj] rglhy tqCcy] ftyk f'keyk]
fg0 iz0
- - izkfFkZuhA
cuke
vke turk
muoku eqdíek-&&nj[okLr cjk, n#Lr fd, tkus izkfFkZuh dk uke Hkw&jktLo fjdkMZ egky /kkj o
'kM+gkuk] iVokj ldZy ikSVk o fegkuk] rglhy tqCcy ckjsA
;g fd Jherh lqpSrk iq=h Jh izkx jke] fuoklh xkao o Mkd?kj /kkj] rglhy tqCcy] ftyk
f'keyk] fg0 iz0 us v/kksgLrk{kjh dh vnkyr esa ,d izkFkZuk&i= izLrqr fd;k gS ftlesa vkxzg fd;k x;k gS
fd mldk uke lqpSrk iq=h Jh izkx jke gS ijUrq iVokj o`Ùk fegkuk] egky 'kM+gkuk esa lqfurk iq=h izkx
jke rFkk iVokj o`Ùk ikSVk] egky /kkj esa lqfe=k nsoh iq=h izkx jke xyr ntZ gSA ftls og n#Lr djokuk
pkgrh gS ftldh Nkuchu fxjnkoj gYdk tqCcy o iVokjh fegkuk o ikSVk ls djokbZ tk pqdh gS eqrkfcd
Nkuchu fjiksVZ ls Hkh ik;k x;k gS fd izkfFkZuh dk lgh o okLrfod uke lqpSrk iq=h izkx jke gS ftls
4243
jkti=] fgekpy izns'k] 30 tqykbZ] 2019@08 Jko.k] 1941
n#Lrh ckjs vkxzg lgh gSA ftl ckjs izkfFkZuh dk iSu dkMZ] vk/kkj dkMZ] xzke iapk;r /kkj dk izek.k&i=
o okf'kUnxku ds C;kukr dyec) djds layXu fd;s x;s gSaA
izkFkZuk&i= esa vkxkeh mfpr dk;Zokgh djus ls iwoZ bl b'rgkj ds ek/;e ls loZlk/kkj.k dks
lwfpr fd;k tkrk gS fd ;fn fdlh O;fDr dks Hkh mijksDr izkfFkZuh ds uke dks iVokj ldZy fegkuk] pd
'kM+gkuk o iVokj o`Ùk ikSVk] pd /kkj esa lqfurk o lqfe=k nsoh iq=h izkx jke ds LFkku ij lqpSrk iq=h izkx
jke n#Lr djus ij dksbZ mtj o ,rjkt gks rks og fnukad 09&08&2019 dks ;k blls iwoZ v/kksgLrk{kjh
dh vnkyr esa gkftj gksdj viuk fyf[kr o ekSf[kd ,rjkt izLrqr djas] nhxj lwjr esa ;g le>k tk,xk
fd izkfFkZuh ds uke dks n#Lr djus ij fdlh dks dksbZ vkifÙk ugha gS rFkk iVokj ldZy fegkuk pd
'kM+gkuk o iVokj o`Ùk ikSVk] pd /kkj esa izkfFkZuh ds uke dh n#Lrh ds vkns'k ikfjr dj fn;s tkosaxsA
vkt fnukad 09&07&2019 dks gekjs gLrk{kj o eksgj vnkyr ls tkjh gqvkA
eksgjA
gLrk{kfjr@&
dk;Zdkjh n.Mkf/kdkjh]
tqCcy] ftyk f'keyk ¼fg0 iz0½A
&&&&&&&&
c vnkyr dk;Zdkjh n.Mkf/kdkjh] ljLorh uxj] ftyk f'keyk] fgekpy izns'k
yksfdUnj iq= Jh izHkq] fuoklh xkao DokYVk] Mkd?kj fxYVkMh] mi&rglhy ljLorh uxj] ftyk
f'keyk] fgekpy izns'kA
cuke
vke turk
izkFkZuk&i= tsj /kkjk 1969¼3½ tUe frfFk ntZ djus ckjsA
yksfdUnj iq= Jh izHkq] fuoklh xkao DokYVk] Mkd?kj fxYVkMh] mi&rglhy ljLorh uxj] ftyk
f'keyk] fgekpy izns'k us bl dk;kZy; esa fuosnu fd;k gS fd mlds iq= lqty dqekj dh tUe frfFk
09&04&2008 gS tksfd vKkurko'k vHkh rd lEcfU/kr xzke iapk;r ds tUe iathdj.k jftLVj esa ntZ
ugha gksuk ik;k x;kA vkosnd vc xzke iapk;r fxYVkMh ds vfHkys[k@tUe iathdj.k jftLVj esa mijksDr
lqty dqekj dh tUe frfFk dks ntZ djokuk pkgrk gSA
vr% bl vnkyrh b'rgkj }kjk loZlk/kkj.k dks lwfpr fd;k tkrk gS fd ;fn bl ckjs fdlh
O;fDr ;k vke turk dks dksbZ mtj o ,rjkt gks rks og fnukad 19&08&2019 rd izkr% 10-00 cts
v/kksgLrk{kjh ds dk;kZy; esa mifLFkr gksdj viuh vkifÙk tkfgj dj ldrk gSA
vkt fnukad 17&07&2019 dks esjs gLrk{kj ,oa eksgj dk;kZy;@U;k;ky; ls tkjh gqvkA
eksgjA
gLrk{kfjr@&
dk;Zdkjh n.Mkf/kdkjh]
ljLorh uxj] ftyk f'keyk ¼fg0 iz0½A
4244
jkti=] fgekpy izns'k] 30 tqykbZ] 2019@08 Jko.k] 1941
In the Court of Niraj Chandla (H.P.A.S), Sub-Divisional Magistrate, Shimla (Urban),
District Shimla, Himachal Pradesh
Smt. Tsering Paldon wife of Sh. Nawang Rinchen, resident of House No. 43, Tibetan
Colony Krishna Nagar, Shimla-1, Tehsil and District Shimla, Himachal Pradesh
. . Applicant.
Versus
General Public
.. Respondent.
Application under section 13(3) of Birth and Death Registration Act, 1969.
Whereas Smt. Tsering Paldon wife of Sh. Nawang Rinchen, resident of House No. 43,
Tibetan Colony, Krishna Nagar, Shimla-1, Tehsil and District Shimla, Himachal Pradesh has
preferred an application to the undersigned for registration of date of birth of herself TSERING
PALDON, (DOB 15-06-1964) at above address in the record of Municipal Corporation, Shimla.
Therefore, this proclamation, the general public is hereby informed that any person having
any objection for entry as to date of birth mentioned above, may submit his objection in writing in
this court on or before 23-08-2019 failing which no objection will be entertained after expiry of
date and will be decided accordingly.
Given under my hand and seal of the Court on this 24th day of July, 2019.
Seal.
NIRAJ CHANDLA (HPAS),
Sub-Divisional Magistrate,
Shimla (Urban), District Shimla (H.P.).
__________
In the Court of Shri Arun Kumar, Executive Magistrate, Tehsil Nerwa,
District Shimla, Himachal Pradesh
Sh. Vikram Sharma s/o Late Sh. Lachhi Ram, r/o Vill. Sanog, P.O. Madhana, Tehsil
Nerwa, District Shimla, H.P. ..Applicant.
Versus
General Public
.. Respondent.
Application under section 13(3) of Birth and Death Registration Act, 1969.
Whereas Sh. Vikram Sharma s/o Late Sh. Lachhi Ram, r/o Vill. Sanog, P.O. Madhana,
Tehsil Nerwa, District Shimla, H.P. has preferred an application to the undersigned for registration
of name of his father name Late Shri Lachhi Ram whose date of death 04-04-2013 Gram Panchayat
Madhana, Tehsil Nerwa, District Shimla, H.P.
Therefore by this proclamation, the General Public is hereby informed that any person
having any objection for entry as to date of death mentioned above, may submit his objection in
writing in this court on or before 25-8-2019 failing which no objection will be entertained after
expiry of date and will be decided accordingly.
4245
jkti=] fgekpy izns'k] 30 tqykbZ] 2019@08 Jko.k] 1941
Given under my hand and seal of the Court on this 22-07-2019.
Seal.
ARUN KUMAR,
Executive Magistrate,
Tehsil Nerwa, District Shimla, H.P.
__________
In the Court of Shri Arun Kumar, Executive Magistrate, Tehsil Nerwa,
District Shimla, Himachal Pradesh
Sh. Joginder Singh s/o Sh. Devi Ram, r/o Vill. Kharchali, P.O. Ruslah, Tehsil Nerwa,
District Shimla, H.P.
..Applicant.
Versus
General Public
.. Respondent.
Application under section 13(3) of Birth and Death Registration Act, 1969.
Whereas Sh. Joginder Singh s/o Sh. Devi Ram, r/o Vill. Kharchali, P.O. Ruslah, Tehsil
Nerwa, District Shimla, H.P. has preferred an application to the undersigned for registration of
name of his son namely Mr. Naveen whose date of birth (24-12-2005) in the Gram Panchayat
Pujarli, Tehsil Nerwa, District Shimla, H.P.
Therefore by this proclamation, the General Public is hereby informed that any person
having any objection for entry as to date of birth mentioned above, may submit his objection in
writing in this court on or before 25-8-2019 failing which no objection will be entertained after
expiry of date and will be decided accordingly.
Given under my hand and seal of the Court on this 22-07-2019.
Seal.
ARUN KUMAR,
Executive Magistrate,
Tehsil Nerwa, District Shimla, H.P.
__________
In the Court of Shri Arun Kumar, Executive Magistrate, Tehsil Nerwa,
District Shimla, Himachal Pradesh
Sh. Santosh s/o Sh. Daulat Ram, r/o Village Navi, P.O. Bharanu, Tehsil Nerwa, District
Shimla, H.P.
..Applicant.
Versus
General Public
.. Respondent.
Application under section 13(3) of Birth and Death Registration Act, 1969.
Whereas Sh. Santosh s/o Sh. Daulat Ram, r/o Village Navi, P.O. Bharanu, Tehsil Nerwa,
District Shimla, H.P. has preferred an application to the undersigned for registration of name of her
4246
jkti=] fgekpy izns'k] 30 tqykbZ] 2019@08 Jko.k] 1941
daughter namely Miss. Rejil whose date of birth (11-01-2018) in the Gram Panchayat Mundli,
Tehsil Nerwa, District Shimla, H.P.
Therefore by this proclamation, the General Public is hereby informed that any person
having any objection for entry as to date of birth mentioned above, may submit his/her objection in
writing in this court on or before 25-8-2019 failing which no objection will be entertained after
expiry of date and will be decided accordingly.
Given under my hand and seal of the Court on this 22-07-2019.
Seal.
ARUN KUMAR,
Executive Magistrate,
Tehsil Nerwa, District Shimla, H.P.
__________
In the Court of Shri Neeraj Gupta, Sub-Divisional Magistrate, Shimla (R),
District Shimla (H. P.)
Sh. Ram Lal Thakur s/o Late Shri Chandu Ram, r/o Village Chharah, P.O. Ghanahatti,
Tehsil & District Shimla, Himachal Pradesh.
Versus
General Public
. . Respondent.
Whereas Sh. Ram Lal Thakur s/o Late Shri Chandu Ram, r/o Village Chharah, P.O.
Ghanahatti, Tehsil & District Shimla, Himachal Pradesh has filed an application alongwith
affidavit in the court of undersigned under section 13(3) of the Birth & Death Registration Act,
1969 to enter the Name/date of birth of his son named Bhupender Thakur s/o Sh. Ram Lal Thakur
s/o Late Shri Chandu Ram, r/o Village Chharah, P.O. Ghanahatti, Tehsil & District Shimla,
Himachal Pradesh in the record of Secy., Birth and Death, Gram Panchayat Bhaloh, Tehsil &
District Shimla.
Sl.
No.
Name of the family member
Relation
Date of Birth
1.
Bhupender Thakur
Son
07-05-2007
Hence, this proclamation is issued to the general public if they have any objection/claim
regarding to enter the name/date of birth of above named in the record of Gram Panchayat Bhaloh,
Tehsil & District Shimla may file their claims/objections on or before one month of publication of
this notice in Govt. Gazette in this court, failing which necessary orders will be passed.
Issued today 22-07-2019 under my signature and seal of the court.
Seal.
Sd/-
Sub-Divisional Magistrate,
Shimla (R), District Shimla.
4247
jkti=] fgekpy izns'k] 30 tqykbZ] 2019@08 Jko.k] 1941
U;k;ky; lgk;d lekgrkZ izFke oxZ lqUuh] ftyk f'keyk] fgekpy izns'k
okn la[;k % 1/XIII-A-1/2019
rkjh[k ejtqvk % 24&07&2019
Jherh fo|k nsoh
cuke
vke turk
izkFkZuk&i= cjk;s n#Lrh ukeA
gjxkg [kkl o vke dks ctfj;k uksfVl lwfpr fd;k tkrk gS fd Jherh fo|k nsoh iq=h Jh lUr
jke] fuoklh egky pkSdh] ijxuk ljkt] rglhy lqUuh] ftyk f'keyk ¼fg0 iz0½ us bl U;k;ky; esa
izkFkZuk&i= izLrqr dj vfHkO;Dr fd;k gS fd izkfFkZu dk uke jktLo fjdkMZ esa uhye iq=h Jh lUrjke ntZ
gS tks fd xyr gS ijUrq iapk;r fjdkMZ o vU; izek.k&i= esa uke fo|k nsoh iq=h Jh lUrjke ntZ gS tks
fd lgh o lR; gSA mUgksaus mls Bhd djus ds fy, izkFkZuk&i= izLrqr fd;k gSA
vr% bl izkFkZuk&i= ckjs vke turk dks lwfpr fd;k tkrk gS fd ;fn fdlh O;fDr dks uke
n#Lr djus esa vkifÙk gks rks og viuh vkifÙk fyf[kr :i esa fnukad 23&08&2019 vFkok blls iwoZ bl
U;k;ky; dks izLrqr djsaA rnksijkUr dksbZ vkifÙk ekU; ugha gksxhA
gekjs gLrk{kj o eksgj vnkyr ls vkt fnukad 24&07&2019 dks tkjh gqvkA
eksgjA
gLrk{kfjr@&
lgk;d lekgrkZ izFke oxZ]
lqUuh] ftyk f'keyk] fg0 iz0A
&&&&&&&&&
c vnkyr lgk;d lekgrkZ f}rh; Js.kh] mi&rglhy /kkeh] rglhy o ftyk f'keyk] fg0 iz0
nj[okLr la[;k % 04@2019 rkjh[k et:vk % 11&07&2019 rkjh[k is'kh % 29&07&2019
Jh ;qxy fd'kksj iq= Jh gse nÙk] fuoklh 'kjksx] Mkd?kj Fkkph] lc&rglhy /kkeh] rglhy o
ftyk f'keyk] fg0 iz0
cuke
¼1½ vke turk
¼2½ iz/kku xzke iapk;r Fkkph
fo"k;-&&izkFkhZ dh iq=h dh tUe frfFk xzke iapk;r Fkkph ds tUe o e`R;q iathdj.k jftLVj esa ntZ
djok;s tkus ckjs] fd vf/kfu;e] 1969 dh /kkjk 13¼3½ tUe ,oe~ e`R;q iathdj.k fu;e 9¼3½ ds
vUrxZr tUe iathdj.k djokus ckjsA
gj [kkl o vke turk dks ctfj;k b'rgkj lwfpr fd;k tkrk gS fd izkFkhZ Jh ;qxy fd'kksj iq=
Jh gse nÙk us v/kksgLrk{kjh ds U;k;ky; esa ,d vkosnu&i= izLrqr fd;k gS fd mldh iq=h dk uke o
tUe frfFk xzke iapk;r dksVyk ds tUe iathdj.k jftLVj esa ntZ ugha djok;k gS] vc izkFkhZ viuh iq=h
dk uke o tUe frfFk xzke iapk;r dksVyk ds tUe iathdj.k jftLVj esa ntZ djokuk pkgrk gS] tks fd
bl izdkj ls gS %&
Øe la[;k
uke
lEcU/k
tUe frfFk
1-
jh;k
iq=h
24&04&2007
4248
jkti=] fgekpy izns'k] 30 tqykbZ] 2019@08 Jko.k] 1941
vr% xzke iapk;r dksVyk] mi&rglhy /kkeh dh turk dks ctfj;k b'rgkj lwfpr fd;k tkrk gS
fd ;fn fdlh O;fDr dks mijksDr uke o tUe iathdj.k ckjs dksbZ vkifÙk gks rks fnukad 28&08&2019 dks
;k blls iwoZ vlkyru ;k odkyru gkftj vnkyr vkdj viuh vkifÙk izLrqr djas vU;Fkk vkosnu&i=
ij tUe iathdj.k ds vkns'k ikfjr djds lfpo xzke iapk;r dksVyk dks vkxkeh dk;kZUo;u gsrq Hkst fn;k
tk;sxkA
vkt fnukad 29&07&2019 dks esjs gLrk{kj o eksgj lfgr vnkyr ls tkjh fd;k x;kA
eksgjA
gLrk{kfjr@&
lgk;d lekgrkZ f}rh; Js.kh]
mi&rglhy /kkeh] ftyk f'keyk ¼fg0 iz0½A
&&&&&&&
c vnkyr mi&e.My n.Mkf/kdkjh] pkSiky] ftyk f'keyk] fg0 iz0
izkFkZuk&i= dqekjh euksjek iq=h Lo0 Jh vkRek jke] fuoklh HkjVksa] rglhy usjok] ftyk f'keyk]
fg0 iz0A
fo"k;%&xzke iapk;r fctey ds ifjokj jftLVj esa nknk dk uke n#Lr djus ckjsA
uksfVl cuke vke turkA
dqekjh euksjek iq=h Lo0 Jh vkRek jke] fuoklh HkjVksa] rglhy usjok] ftyk f'keyk] fg0 iz0 us
,d vkosnu&i= bl dk;kZy; esa izLrqr fd;k gS fd mlesa nknk Lo0 Jh yPNh jke ds LFkku ij iapk;r
vfHkys[k@ifjokj jftLVj xzke iapk;r fctey esa dfy;k fy[kk x;k gS tksfd xyr gSA Lo0 dfy;k]
Lo0 yPNh jke dk HkkbZ Fkk] nksuksa ds vius&vius ifjokj o vkSykn FkhA tcfd jktLo vfHkys[k esa mDr
euksjek ds nknk ds uke dk bUnzkt n#Lr gS dqekjh euksjek ds firk Jh vkRek jke dk fu/ku gks pqdk gS]
xzke iapk;r fctey e`rd vkRek jke iq= yPNh jke dk e`R;q izek.k&i= tkjh ugha dj jgh gS ftlds
dkj.k e`rd firk dh Hkwfe dk bardky rLnhd djokus esa mls dfBukbZ vk jgh gSA jktLo vfHkys[k pd
HkjVksa ds vuqlkj yPNh jke o dfy;k] refu;k ds iq= FksA yPNh jke dk iq= vkRek jke gS rFkk izkfFkZ;k
ds e`rd firk vkRek jke pd HkjVksa esa ekfyd vjkth gSA izkfFkZ;k pkgrh gS fd mlds e`rd nknk dk uke
xzke iapk;r fctey ds ifjokj jftLVj esa dkfy;k ds LFkku ij yPNh jke n#Lr fd;k tk;sA iqf"V gsrq
udy tekcUnh o 'ktjk uLc layXu dh gSA e`rd vkRek jke ds firk dk uke yPNh jke lgh o n#Lr
gS vkSj xyrh ls dfy;k jke fy[kk x;k gS D;ksafd dfy;k dh viuh iRuh o vkSykn gS vkSj yPNh jke dh
Hkh viuh vkSykn o iRuh gSA
vr% gj vke o [kkl dks bl b'rgkj ds ek/;e ls lwfpr fd;k tkrk gS fd ;fn fdlh dks
izkfFkZ;k ds nknk dk uke xzke iapk;r fctey ds ifjokj jftLVj esa dfy;k ds LFkku ij yPNh jke
n#Lr djus ckjs dksbZ ,rjkt gks rks og viuh vkifÙk bl U;k;ky; esa fnukad 28&08&2019 ls iwoZ
vlkyru ;k odkyru izLrqr djsaA nhxj lwjr esa fnukad 28&08&2019 dks xzke iapk;r fctey ds
iapk;r vfHkys[k esa vkRek jke iq= yPNh jke dh n#Lrh ds vkns'k ikfjr fd;s tk;saxsA
vkt fnukad 17&07&2019 dks esjs gLrk{kj o eksgj U;k;ky; ls tkjh gqvkA
eksgjA
gLrk{kfjr@&
mi&e.My n.Mkf/kdkjh ¼uk0½]
pkSiky] ftyk f'keyk ¼fg0 iz0½A
4249
jkti=] fgekpy izns'k] 30 tqykbZ] 2019@08 Jko.k] 1941
CHANGE OF NAME
I, Shakuntla w/o Shri Jit Ram, r/o & V.P.O. Kaithlighat, Tehsil Kandaghat, Distt. Solan,
Himachal Pradesh do hereby solemnly affirm and declare on affidavit dated 22-07-2019 that I have
changed my name as Shakuntla Devi instead of Shakuntla. So in future I may be known as
Shakuntla Devi for all purposes and necessary records.
SHAKUNTLA ,
w/o Shri Jit Ram, r/o & V.P.O. Kaithlighat,
Tehsil Kandaghat, Distt. Solan, Himachal Pradesh.
__________
CHANGE OF NAME
I, Goldi Negi s/o Sh. Manohar Lal Negi, r/o Village Dhirar, P.O. Nagrota Gazain, Tehsil
Bhoranj, Distt. Hamirpur, Himachal Pradesh have changed my name from Goldi Negi to Gaurav
Negi vide affidavit dated 29-06-2019.
GOLDI NEGI
s/o Sh. Manohar Lal Negi, r/o Village Dhirar,
P.O. Nagrota Gazain, Tehsil Bhoranj, Distt. Hamirpur,
Himachal Pradesh.
4250
jkti=] fgekpy izns'k] 30 tqykbZ] 2019@08 Jko.k] 1941
fu;U=d] eqnz.k rFkk ys[ku lkexzh] fgekpy izns'k] f'keyk&5 }kjk eqfnzr rFkk izdkf'kr
bysDVªkWfud gLrk{kfjr jkti=] oSclkbV http://rajpatrahimachal.nic.in ij miyC/k gS ,oe~ vkWuykbu lR;kfir fd;k tk ldrk gS