THE

JAMMU & KASHMIR GOVERNMENT GAZETTE

Vol. 128] Srinagar, Thu., the 27th Aug., 2015/5th Bhad., 1937. [ No. 22

––––––––––––––––––––––––––––––––––––––––––––––––––––––

REGD NO. JK––33

CONTENTS

English

Pages

Vernacu-

lar pages

PART

I-A- Appointments, promotions, transfers and

leave of absence sanctioned by the Governor,

Government and the Ministers

....

PART

I-B- Notifications, Communiques and General Orders

by the Government and the Ministers ....

PART II-A- Appointments, promotions, transfers and

leave of absence sanctioned by Heads of

Departments....

PART

II-B- Notifications, Notices and Orders by Heads

of

Departments,

Provincial

Heads,

Magistrates and other officers competent to

issue public notices under any law or rule.....

PART

II-C- Notifications, Notices and Orders by Election

Commission of India, Chief Electoral Officer,

Jammu and Kashmir and other Officers of the

Department,

Election

Petitions

and

Judgements of Election Tribunal ....

PART

III- Laws, Regulations and Rules passed

thereunder

....

PART

IV- Reprints from the Government of India Gazette

or Gazettes of others Governments....

PART

V- Information and Statistics ....

(a) Rates and prices in the State....

(b) Rates and wages ....

(c) Crop Report and Forecasts ....

(d) Whether Observations

....

(e) Vital Statistics

....

SUPPLEMENT-A–Trade

Monthly Imports and Exports from

the State ....

SUPPLEMENT-B–Police

....

SUPPLEMENT-C–Advertisements

....

Printed at the Government Press, Srinagar.

220-228

131-134

43-44

367-380

95-96

121-124

PART I-A

Jammu & Kashmir Government–Orders.

––––––––

HIGH COURT OF JAMMU AND KASHMIR AT SRINAGAR.

Notification

No. 182 Dated 27-05-2015.

It is hereby notified that vide High Court Order dated 19-05-2015

Ms. Chandni Bhagat D/o Shri Shamsher Bhagat R/o Sector 6, H. No. 92,

Model Town, Gangyal, Jammu has been admitted and enrolled as an

Advocate on the Rolls of Jammu and Kashmir Bar Council provisionally

for a period of one year from the date of issuance of this notification. Her

name has been entered under Serial No. JK-211/2015 in the Roll of

Advocates maintained by this Registry.

The renewal/extension of provisional license/enrolment must be sought

before the date of expiry unless the absolute/final enrolment as an Advocate

is ordered therebefore.

––––––––

Notification

No. 183 Dated 27-05-2015.

It is hereby notified that vide High Court Order dated 19-05-2015

Mr. Randeep Singh S/o Mr. Mohan Singh R/o H. No. 119, Sector-11,

Nanak Nagar, Jammu has been admitted and enrolled as an Advocate on

the Rolls of Jammu and Kashmir Bar Council provisionally for a period of

one year from the date of issuance of this notification. His name has been

entered under Serial No. JK-201/2015 in the Roll of Advocates maintained

by this Registry.

220 The J&K Govt. Gazette, 27th Aug., 2015/5th Bhad., 1937. [ No. 22

––––––––––––––––––––––––––––––––––––––––––––––––—–––————–

The renewal/extension of provisional license/enrolment must be sought

before the date of expiry unless the absolute/final enrolment as an Advocate

is ordered therebefore.

––––––––

Notification

No. 184 Dated 28-05-2015.

It is hereby notified that vide High Court Order dated 19-05-2015

Mr. Dheondra Partap Singh S/o Shri Digvijay Singh Sambyal R/o Mandi

Kehli, Samba A/P H. No. 369, Sector-F, Sainik Colony, Jammu has been

admitted and enrolled as an Advocate on the Rolls of Jammu and Kashmir

Bar Council provisionally for a period of one year from the date of

issuance of this notification. His name has been entered under Serial

No. JK-242/2015 in the Roll of Advocates maintained by this Registry.

The renewal/extension of provisional license/enrolment must be sought

before the date of expiry unless the absolute/final enrolment as an Advocate

is ordered therebefore.

––––––––

Notification

No. 185 Dated 28-05-2015.

It is hereby notified that vide High Court Order dated 19-05-2015

Mr. Anoop Plathia S/o Shri Nand Lal R/o Arnia, Ward No. 3, House

No. 64, Bishnah, Jammu has been admitted and enrolled as an Advocate

on the Rolls of Jammu and Kashmir Bar Council provisionally for a period

of one year from the date of issuance of this notification. His name has

been entered under Serial No. JK-225/15 in the Roll of Advocates maintained

by this Registry.

The renewal/extension of provisional license/enrolment must be sought

before the date of expiry unless the absolute/final enrolment as an Advocate

is ordered therebefore.

––––––––

No. 22] The J&K Govt. Gazette, 27th Aug., 2015/5th Bhad., 1933. 221

–––––––—––––––––––––––––––––––––––––––––––––––––––––––––———

Notification

No. 186 Dated 28-05-2015.

It is hereby notified that vide High Court Order dated 19-05-2015

Mr. Yoginder Singh Jamwal S/o Late Shri Rawel Singh Jamwal R/o Majhli

Mandi, Village Raipur, Jammu A/P Cosmic College Complex, Lakhanpur,

Kuthua has been admitted and enrolled as an Advocate on the Rolls of

Jammu and Kashmir Bar Council provisionally for a period of one year

from the date of issuance of this notification. His name has been entered

under Serial No. JK-208/2015 in the Roll of Advocates maintained by this

Registry.

The renewal/extension of provisional license/enrolment must be sought

before the date of expiry unless the absolute/final enrolment as an Advocate

is ordered therebefore.

––––––––

Notification

No. 187 Dated 28-05-2015.

It is hereby notified that vide High Court Order dated 19-05-2015

Mr. Hardesh Kumar S/o Shri Shish Pal R/o Ward No. Old-4, New 7,

Qasiba Bala, Nowshera, District Rajouri has been admitted and enrolled

as an Advocate on the Rolls of Jammu and Kashmir Bar Council

provisionally for a period of one year from the date of issuance of this

notification. His name has been entered under Serial No. JK-224/15 in the

Roll of Advocates maintained by this Registry.

The renewal/extension of provisional license/enrolment must be sought

before the date of expiry unless the absolute/final enrolment as an Advocate

is ordered therebefore.

––––––––

Notification

No. 188 Dated 28-05-2015.

It is hereby notified that vide High Court Order dated 19-05-2015

Mr. Trishant Gupta S/o Shri Sushil Gupta R/o Ward No. 10, Kathua has

been admitted and enrolled as an Advocate on the Rolls of Jammu and

222 The J&K Govt. Gazette, 27th Aug., 2015/5th Bhad., 1937. [ No. 22

––––––––––––––––––––––––––––––––––––––––––––––––—–––————–

Kashmir Bar Council provisionally for a period of one year from the date of

issuance of this notification. His name has been entered under Serial

No. JK-207/15 in the Roll of Advocates maintained by this Registry.

The renewal/extension of provisional license/enrolment must be sought

before the date of expiry unless the absolute/final enrolment as an Advocate

is ordered therebefore.

––––––––

Notification

No. 189 Dated 28-05-2015.

It is hereby notified that vide High Court Order dated 19-05-2015

Ms. Meetika Sharma D/o Shri Ramesh Chander R/o Sanghani, P/O

Barui, Akhnoor, District Jammu has been admitted and enrolled as an

Advocate on the Rolls of Jammu and Kashmir Bar Council provisionally

for a period of one year from the date of issuance of this notification. Her

name has been entered under Serial No. JK-206/15 in the Roll of Advocates

maintained by this Registry.

The renewal/extension of provisional license/enrolment must be sought

before the date of expiry unless the absolute/final enrolment as an Advocate

is ordered therebefore.

––––––––

Notification

No. 190 Dated 28-05-2015.

It is hereby notified that vide High Court Order dated 19-05-2015

Ms. Monika Rathore D/o Shri Sehdev Singh Rathore R/o Village Khanetar,

Tehsil Haveli, District Poonch A/P H. No. 62/A, Daily Excelsior Lane,

Indira Colony, Old Janipur, Jammu has been admitted and enrolled as an

Advocate on the Rolls of Jammu and Kashmir Bar Council provisionally

for a period of one year from the date of issuance of this notification. Her

name has been entered under Serial No. JK-205/15 in the Roll of Advocates

maintained by this Registry.

No. 22] The J&K Govt. Gazette, 27th Aug., 2015/5th Bhad., 1933. 223

–––––––—––––––––––––––––––––––––––––––––––––––––––––––––———

The renewal/extension of provisional license/enrolment must be sought

before the date of expiry unless the absolute/final enrolment as an Advocate

is ordered therebefore.

––––––––

Notification

No. 191 Dated 28-05-2015.

It is hereby notified that vide High Court Order dated 19-05-2015

Mr. Asif Ali Malik S/o Shri Ali Mohd Malik R/o Frestabal, Pampore,

District Pulwama has been admitted and enrolled as an Advocate on the

Rolls of Jammu and Kashmir Bar Council provisionally for a period of one

year from the date of issuance of this notification. His name has been

entered under Serial No. JK-243/15 in the Roll of Advocates maintained by

this Registry.

The renewal/extension of provisional license/enrolment must be sought

before the date of expiry unless the absolute/final enrolment as an Advocate

is ordered therebefore.

––––––––

Notification

No. 192 Dated 28-05-2015.

It is hereby notified that vide High Court Order dated 19-05-2015

Ms. Afshana Nazir Rather D/o Shri Nazir Ahmad Rather R/o Sarai Safa

Kadal, Sonerkul, Srinagar has been admitted and enrolled as an Advocate

on the Rolls of Jammu and Kashmir Bar Council provisionally for a period

of one year from the date of issuance of this notification. Her name has

been entered under Serial No. JK-248/2015 in the Roll of Advocates

maintained by this Registry.

The renewal/extension of provisional license/enrolment must be sought

before the date of expiry unless the absolute/final enrolment as an Advocate

is ordered therebefore.

––––––––

224 The J&K Govt. Gazette, 27th Aug., 2015/5th Bhad., 1937. [ No. 22

––––––––––––––––––––––––––––––––––––––––––––––––—–––————–––

Notification

No. 193 Dated 28-05-2015.

It is hereby notified that vide High Court Order dated 19-05-2015

Mr. Anirudh Partap S/o Lt. Shri Balraj Singh Jamwal R/o Lane No. 4,

Tawi Vihar Housing Colony, Sidhra, Jammu has been admitted and enrolled

as an Advocate on the Rolls of Jammu and Kashmir Bar Council

provisionally for a period of one year from the date of issuance of this

notification. His name has been entered under Serial No. JK-232/2015 in

the Roll of Advocates maintained by this Registry.

The renewal/extension of provisional license/enrolment must be sought

before the date of expiry unless the absolute/final enrolment as an Advocate

is ordered therebefore.

––––––––

Notification

No. 194 Dated 28-05-2015.

It is hereby notified that vide High Court Order dated 19-05-2015

Ms. Malvi Sumbyal D/o Shri Pawan Singh R/o Mandi Thalora, Samba

has been admitted and enrolled as an Advocate on the Rolls of Jammu and

Kashmir Bar Council provisionally for a period of one year from the date of

issuance of this notification. Her name has been entered under Serial

No. JK-237/2015 in the Roll of Advocates maintained by this Registry.

The renewal/extension of provisional license/enrolment must be sought

before the date of expiry unless the absolute/final enrolment as an Advocate

is ordered therebefore.

––––––––

Notification

No. 195 Dated 28-05-2015.

It is hereby notified that vide High Court Order dated 19-05-2015

Mr. Charanje Lal S/o Shri Isher Dass R/o Mangerli, (Rease), Tehsil and

District Udhampur has been admitted and enrolled as an Advocate on the

Rolls of Jammu and Kashmir Bar Council provisionally for a period of one

No. 22] The J&K Govt. Gazette, 27th Aug., 2015/5th Bhad., 1933. 225

–––––––—––––––––––––––––––––––––––––––––––––––––––––––––———

year from the date of issuance of this notification. His name has been

entered under Serial No. JK-231/2015 in the Roll of Advocates maintained

by this Registry.

The renewal/extension of provisional license/enrolment must be sought

before the date of expiry unless the absolute/final enrolment as an Advocate

is ordered therebefore.

––––––––

Notification

No. 196 Dated 28-05-2015.

It is hereby notified that vide High Court Order dated 19-05-2015

Mr. Nischal Jyoti S/o Shri Omkar Singh R/o Deoray Kubbay, P/O

Karloop, Tehsil Marh, District Jammu has been admitted and enrolled as

an Advocate on the Rolls of Jammu and Kashmir Bar Council provisionally

for a period of one year from the date of issuance of this notification. His

name has been entered under Serial No. JK-227/2015 in the Roll of

Advocates maintained by this Registry.

The renewal/extension of provisional license/enrolment must be sought

before the date of expiry unless the absolute/final enrolment as an Advocate

is ordered therebefore.

––––––––

Notification

No. 197 Dated 28-05-2015.

It is hereby notified that vide High Court Order dated 19-05-2015

Ms. Bhanu Bhatia D/o Shri Narinder Kumar R/o H. No. 35, New Plot,

Rehari, Jammu has been admitted and enrolled as an Advocate on the

Rolls of Jammu and Kashmir Bar Council provisionally for a period of one

year from the date of issuance of this notification. Her name has been

entered under Serial No. JK-228/2015 in the Roll of Advocates maintained

by this Registry.

The renewal/extension of provisional license/enrolment must be sought

before the date of expiry unless the absolute/final enrolment as an Advocate

is ordered therebefore.

––––––––

226 The J&K Govt. Gazette, 27th Aug., 2015/5th Bhad., 1937. [ No. 22

––––––––––––––––––––––––––––––––––––––––––––––––—–––————–––

Notification

No. 198 Dated 28-05-2015.

It is hereby notified that vide High Court Order dated 19-05-2015

Ms. Kamal Sharma D/o Shri Birbal Sharma R/o Lower Hathal, Tehsil

Sunderbani, District Rajouri A/P Narwal Bye-Pass Road, Mohalla Shiv

Shakti Temple, Jammu has been admitted and enrolled as an Advocate on

the Rolls of Jammu and Kashmir Bar Council provisionally for a period of

one year from the date of issuance of this notification. Her name has

been entered under Serial No. JK-215/2015 in the Roll of Advocates

maintained by this Registry.

The renewal/extension of provisional license/enrolment must be sought

before the date of expiry unless the absolute/final enrolment as an Advocate

is ordered therebefore.

––––––––

Notification

No. 199 Dated 28-05-2015.

It is hereby notified that vide High Court Order dated 19-05-2015

Ms. Kanchan Verma D/o Shri Puran Chand R/o Kangrail, Tehsil and

District Jammu has been admitted and enrolled as an Advocate on the

Rolls of Jammu and Kashmir Bar Council provisionally for a period of one

year from the date of issuance of this notification. Her name has been

entered under Serial No. JK-221/2015 in the Roll of Advocates maintained

by this Registry.

The renewal/extension of provisional license/enrolment must be sought

before the date of expiry unless the absolute/final enrolment as an Advocate

is ordered therebefore.

––––––––

Notification

No. 200 Dated 29-05-2015.

It is hereby notified that vide High Court Order dated 19-05-2015

Mr. Vinod Kumar Mahajan S/o Shri Dewan Mela Ram Mahajan R/o

H. No. 281, Sector-3, Channi Himmat, Jammu has been admitted and

No. 22] The J&K Govt. Gazette, 27th Aug., 2015/5th Bhad., 1933. 227

–––––––—––––––––––––––––––––––––––––––––––––––––––––––––———

enrolled as an Advocate on the Rolls of Jammu and Kashmir Bar Council

provisionally for a period of one year from the date of issuance of this

notification. His name has been entered under Serial No. JK-238/2015 in

the Roll of Advocates maintained by this Registry.

The renewal/extension of provisional license/enrolment must be sought

before the date of expiry unless the absolute/final enrolment as an Advocate

is ordered therebefore.

––––––––

Notification

No. 201 Dated 29-05-2015.

It is hereby notified that vide High Court Order dated 19-05-2015

Ms. Vishakha Chib D/o Shri Sham Singh R/o Khour, District Jammu

A/P Purkhoo, P/O Domana, Jammu has been admitted and enrolled as an

Advocate on the Rolls of Jammu and Kashmir Bar Council provisionally

for a period of one year from the date of issuance of this notification. Her

name has been entered under Serial No. JK-219/2015 in the Roll of

Advocates maintained by this Registry.

The renewal/extension of provisional license/enrolment must be sought

before the date of expiry unless the absolute/final enrolment as an Advocate

is ordered therebefore.

(Sd.) G. M. PARRAY,

Joint Registrar (Adm.).

228 The J&K Govt. Gazette, 27th Aug., 2015/5th Bhad., 1937. [ No. 22

––––––––––––––––––––––––––––––––––––––––––––––––—–––————–––

GOVERNMENT OF JAMMU AND KASHMIR,

CIVIL SECRETARIAT—GENERAL ADMINISTRATION

DEPARTMENT

(Administration Section).

Subject :— Appointment of Chairperson, J&K State Social Welfare

Board.

————

Corrigendum to Government Order No. 954-GAD of 2015

Dated 09-07-2015.

Please read “Dr. (Prof.) Nirmal Gupta” in place of “Dr. (Prof.)

Nirmal Kamal” wherever appearing in the Government Order

THE

JAMMU & KASHMIR GOVERNMENT GAZETTE

Vol. 128] Srinagar, Thu., the 27th August, 2015/5th Bhad., 1937. [ No. 22

Separate paging is given to this part in order that it may be filed as a

separate compilation.

PART I—B

Jammu and Kashmir Government—Notifications.

———–

No. 954-GAD of 2015 dated 09-07-2015, issued under endorsement

No. GAD (Adm.) 253/2008-V dated 09-07-2015.

By order of the Government of Jammu and Kashmir.

(Sd.) IMTEEAZ KACHO,

Under Secretary to the Government,

General Administration Department.

—————

GOVERNMENT OF JAMMU AND KASHMIR,

CIVIL SECRETARIAT—GENERAL ADMINISTRATION

DEPARTMENT

(Services).

Subject :— Setting up of a Lead Agency to act as the Secretariat of the

State Road Safety Council–measures to promote Road Safety

thereof.

Reference :— (i)

F. No. 44/CoRS/2014 dated the 3rd of March, 2015,

and the 4th of June, 2015, from the Secretary,

Committee of Road Safety, Supreme Court of India.

(ii)

U. O. No. TR-161/MVD/2015 dated 17-06-2015 from

the Transport Department.

————

Government Order No. 854-GAD of 2015

Dated 29-06-2015.

Sanction is hereby accorded to the setting up of a Lead Agency to act

as the ‘Secretariat of the State Road Safety Council’ and coordinate all

132 The J&K Govt. Gazette, 27th Aug., 2015/5th Bhad., 1937. [ No. 22

––––––––––––––––––––––––––––––––––––––––––––––––—–––————–––

activities relating to the road safety in the State, which would include the

functions of the Police, Public Works (R&B) Department, Education

Department, Health Department, Local Bodies, Non-Government

Organizations and other departments concerned with the road safety.

It is further ordered that the Secretariat shall function under the

charge of the Administrative Secretary, Transport Department and

comprise the following staff to be posted from the departments

indicated against each :—

1.

Additional Secretary

An officer holding the Selection

Grade of KAS, to be deputed by the

General Administration Department.

2.

Additional Secretary

An SSP level officer, to be deputed

(Technical)

by the Home Department.

3.

Additional Secretary

A Superintending Engineer level

(Technical)

officer, to be deputed by the Public

Works (R&B) Department.

4.

Under Secretary

A Junior Scale of KAS/equivalent

level officer, to be deputed by the

General Administration Department.

5.

Statistical Officer

To be deputed by the Planning and

Development Department.

6.

Head Assistant

To be deputed by the General

Administration Department.

7.

Personal Assistant

To be deputed by the General

Administration Department.

8.

Senior Assistant

To be deputed by the General

Administration Department.

No. 22] The J&K Govt. Gazette, 27th Aug., 2015/5th Bhad., 1933. 133

–––––––—––––––––––––––––––––––––––––––––––––––––––––––––———

The above officers/officials shall, upon their posting in the Secretariat

of the State Road Safety Council, continue to draw their salary from their

respective parent departments, till further orders.

By order of the Government of Jammu and Kashmir.

(Sd.) GAZZANFER HUSSAIN,

Commissioner/Secretary to the Government,

General Administration Department.

—————

GOVERNMENT OF JAMMU AND KASHMIR,

CIVIL SECRETARIAT—CHIEF MINISTER’S SECRETARIAT.

Subject :— J&K Government Grievance Cell.

Reference :— Order No. 775-GAD of 2015 dated 10-06-2015 issued by

the General Administration Department.

————

Order No. CMS–35 of 2015

Dated 07-07-2015.

Order No. CMS-28 of 2015 dated 25-06-2015 issued under

endorsement No. CMS/Genl./165/2015 dated 25-06-2015 shall deemed to

have been withdrawn abinitio.

(Sd.)...................................

Principal Secretary to HCM.

134 The J&K Govt. Gazette, 27th Aug., 2015/5th Bhad., 1937. [ No. 22

––––––––––––––––––––––––––––––––––––––––––––––––—–––————–––

THE

JAMMU & KASHMIR GOVERNMENT GAZETTE

––––––––––––––––––––––––––––––––––––––––––––––––––––––

Vol. 128] Srinagar, Thu., the 27th Aug., 2015/5th Bhad., 1937. [ No. 22

––––––––––––––––––––––––––––––––––––––––––––––––––––––

Separate paging is given to this part in order that it may be filed as a

separate compilation.

––––––––––––––––––––––––––––––––––––––––––––––––––––––

PART II––A

Orders by Heads of Departments.

–––––––

CHARGE REPORTS

Subject :––Appointment of Kousar Ahmad Qureshi, District and Sessions

Judge as Presiding Officer of the Industrial Tribunal and Labour

Court, J&K.

–––––––

In pursuance of Government Order No. 2137-LD (A) of 2015 dated

22-07-2015, I have assumed the charge as Presiding Office, of the Office

of Industrial Tribunal-cum-Labour Court, Jammu and Kashmir State with

effect from day of 29th July, 2015 afternoon.

(Sd.) KOUSAR AHMAD QURESHI,

District and Sessions Judge,

Presiding Officer,

Industrial Tribunal/Labour Court.

–––––––

Subject :––Assuming of charge as Director General, Fire and Emergency

Services, J&K.

–––––––

In pursuance of Government Order No. 675-GAD of 2015 dated

18-05-2015, I hereby assume the charge as Director General, Fire and

Emergency Services, J&K today on 21-05-2015 A. N.

(Sd.) Er. R. S. SODHI,

Director General,

Fire and Emergency Services, J&K,

Srinagar.

44 The J&K Govt. Gazette, 27th Aug., 2015/5th Bhad., 1937. [ No. 22

––––––––––––––––––––––––––––––––––––––––––––––––—–––————––

GOVERNMENT OF JAMMU AND KASHMIR,

OFFICE OF THE DEPUTY COMMISSIONER,

SHOPIAN.

Notification of land under section 4 (1) of State Land Acquisition

Act, 1990.

Subject :—Acquisition of land for construction of Reshnagri

Check-i-Ismilwani road under PMGSY.

––––––—

The Executive Engineer, PMGSY (JKRRDA) vide his No. EE/PMGSY/

POI/1338-39 dated 04-08-2014, placed an indent for leftout 14 Marlas of

land coming under the alignment of Reshnagri Check-i-Ismailwani road.

THE

JAMMU & KASHMIR GOVERNMENT GAZETTE

Vol. 128] Srinagar, Thu., the 27th August, 2015/5th Bhad., 1937. [ No. 22

Separate paging is given to this part in order that it may be filed

as a separate compilation.

PART II––B

Notifications, Notices and Orders by the Heads of Departments.

————

––––––––––––––––––––––––––––––––––––––––––––––––––––––

Accordingly, the Tehsildar was directed to prepare Shajra Khasra and

other allied revenue papers, for the said quantum of land vide this office

letter No. DCDS/LAC/15/56 dated 26-02-2015. The Tehsildar, Shopian

vide his No. 156/OQ/Spn dated 12-05-2015, submitted the attested Shajra

Khasra along with other allied revenue papers duly authenticated by the

Indenting Department, Assistant Executive Engineer, PMGSY

(JKRRDA) Sub-Division-1st, Pulwama.

In exercise of powers vested in me under section 4 (1) of State

Land Acquisition Act, 1990, I, Riyaz Ahmad Beigh, KAS, Collector,

Land Acquisition (Assistant Commissioner, Revenue), Shopian, do hereby

notify the land, particulars of which are given below, for its acquisition for

the public purpose namely construction of Reshnagri Check-i-Ismailwani

road.

Particulars of land

District

Tehsil

Village

Khasra

Area

No.

–––––––––––––––––––––––––––––––––––––––––––––––––––––

K. M. S.

Shopian

Shopian

Reshnagri

583 Min

00–14–00

All the concerned persons interested in the land under acquisition,

may file their objections, if any, to the said acquisition before the

undersigned within a period of 15 days, from the date of issuance of this

notification.

(Sd.) RIYAZ AHMAD BEIGH, KAS,

Collector, Land Acquisition,

Assistant Commissioner, Revenue,

Shopian.

————

268 The J&K Govt. Gazette, 27th Aug., 2015/5th Bhad., 1937. [ No. 22

––––––––––––––––––––––––––––––––––––––––––––––––—–––————

GOVERNMENT OF JAMMU AND KASHMIR,

OFFICE OF THE DEPUTY COMMISSIONER,

SHOPIAN.

Notification of land under section 4 (1) of State Land Acquisition Act,

1990.

Subject :—Acquisition of land for widening of Shopian-Bijbehara road

from Sangaloo Chowk to Habdipora Crossing.

––––––—

The Executive Engineer, R&B Division, Shopian, placed an indent

vide his letter No. LC/19/2237 dated 08-06-2015, for acquisition of land

for the widening of Shopian-Bijbehara road from Sangaloo Chowk to

Habdipora crossing for land measuring 05 Kanals 03 Marlas and 06 Sersais

(for Phase 1st) and accordingly, the Tehsildar, Shopian was directed to

prepare the Shajra Khasra and other allied revenue papers. The Tehsildar,

Shopian vide his letter No. 206/OQ/Spn dated 25-05-2015, submitted the

duly attested Shajra Khasra and other allied revenue papers for land

measuring 05 Kanals 03 Marlas 06 Sersais as per the alignment of Indenting

Department.

The indenting Department (Executive Engineer, R&B Division,

Shopian) vide his letter No. LC/19/5041-45 dated 28-07-2015 submitted

the authenticated Shajra Khasra along with other allied revenue papers.

Therefore, in exercise of powers vested in me under section 4 (1) of

J&K State Land Acqusiition Act, 1990, I, Riyaz Ahmad Beigh, KAS,

Collector, Land Acquisition (Assistant Commissioner, Revenue), Shopian,

do hereby notify the land, particulars of which are given below, for its

acquisition for the public purpose, namely widening of Shopian-Bijbehara

road from Sangaloo Chowk to Habdipora Crossing (Phase 1st) :—

Particulars of land

District

Tehsil

Village

Khasra

Area

Nos.

–––––––––––––––––––––––––––––––––––––––––––––––––––––

1

2

3

4

5

–––––––––––––––––––––––––––––––––––––––––––––––––––––

K. M. S. Sq.

Feet

Shopian

Shopian

Hergam

187

00–07–07–04.5

190

00–03–00–16.0

No. 22] The J&K Govt. Gazette, 27th Aug., 2015/5th Bhad., 1933. 269

–––––––—––––––––––––––––––––––––––––––––––––––––––––––––———

191

00–02–02–19.0

197

00–02–00–02.0

198

00–03–00–24.0

199

00–03–05–23.0

200

00–02–03–25.0

532

00–01–01–05.0

598/532

00–01–06–11.5

686/532

00–03–03–03.5

726/532

00–01–04–07.0

711/532

00–03–08–10.0

716/532

00–01–06–26.0

839/532

00–00–07–22.0

878/532

00–02–07–09.5

898/532

00–00–07–16.5

911/532

00–00–06–11.0

914/532

00–01–00–04.0

943/532

00–00–07–28.5

944/532

00–01–03–14.0

980/532

00–09–04–23.0

1376/532

00–00–05–29.0

1381/532

00–00–03–29.0

1385/532

00–00–07–08.0

1386/532

00–00–03–17.0

1395/532

00–00–07–08.5

1436/1313/532

01–16–03–21.0

1

2

3

4

5

–––––––––––––––––––––––––––––––––––––––––––––––––––––

K. M. S. Sq.

Feet

270 The J&K Govt. Gazette, 27th Aug., 2015/5th Bhad., 1937. [ No. 22

––––––––––––––––––––––––––––––––––––––––––––––––—–––————

1439/1313/532

00–00–05–29.0

201 min 00–07–07–20.0

——————

Total

05–03–06–00.0

——————

All the concerned persons interested in the land under acquisition,

may file their objections, if any, to the said acquisition before the

undersigned within a period of 15 days from the date of issuance of this

notification.

(Sd.) RIYAZ AHMAD BEIGH, KAS,

Collector, Land Acquisition,

Assistant Commissioner, Revenue,

Shopian.

————

IN THE COURT OF SPECIAL MUNICIPAL MOBILE

MAGISTRATE, JAMMU.

Present : Ashwani Kumar Sharma

State through P/S, Pacca Danga, Jammu

Vs.

Dilbag Singh S/o Satwant Singh R/o Palanwala, Tehsil Akhnoor.

FIR No. 207/94 for the offences under section 294 RPC of

P/S, Pacca Danga, Jammu.

Proclamation under section 87 Cr. P. C.

Whereas, the proceeding under section 87 Cr. P. C. are pending

against the accused before this court from 18-12-2013 but the accused

has failed to cause his appearance before this court so far.

1

2

3

4

5

–––––––––––––––––––––––––––––––––––––––––––––––––––––

K. M. S. Sq.

Feet

No. 22] The J&K Govt. Gazette, 27th Aug., 2015/5th Bhad., 1933. 271

–––––––—––––––––––––––––––––––––––––––––––––––––––––––––———

Through the medium of this proclamation accused is directed to cause

his appearance before this court within 30 days from the date of

publication of this proclamation failing which proceeding under section

87/88 Cr. P. C. shall be launched against the accused and the property

of the accused both movable and immovable shall be attached. Put

up on 26-08-2015.

Given under my hand and seal of this court today on

6th June, 2015.

(Sd.)................................

Special Municipal Mobile Magistrate,

Jammu.

————

IN THE COURT OF SPECIAL MUNICIPAL MOBILE

MAGISTRATE, JAMMU.

Present : Ashwani Kumar Sharma

State through P/S, Bahu-Fort, Jammu

Vs.

Ghulam Hussain S/o Sher Ali R/o Angralla, Tehsil Mahore,

District Udhampur, A/P Rakh Bahu.

FIR No. 2/01 for the offences under section 451/323 RPC.

Proclamation under section 87 Cr. P. C.

Whereas, the proceeding under section 87 Cr. P. C. are pending

against the accused before this court from 28-05-2005 but the accused

has failed to cause his appearance before this court so far.

Through the medium of this proclamation accused is directed

to cause his appearance before this court within 30 days from the

date of publication of this proclamation failing which proceeding under

section 87/88 Cr. P. C. shall be launched against the accused and

the property of the accused both movable and immovable shall be

attached. Put up on 20-08-2015.

272 The J&K Govt. Gazette, 27th Aug., 2015/5th Bhad., 1937. [ No. 22

––––––––––––––––––––––––––––––––––––––––––––––––—–––————

Given under my hand and seal of this court today

on 02-06-2015.

(Sd.)................................

Special Municipal Mobile Magistrate,

Jammu.

————

GOVERNMENT OF JAMMU AND KASHMIR,

OFFICE OF THE DEPUTY COMMISSIONER,

SRINAGAR.

Notification

Whereas, the land specifications of which are given below is

required for public purpose namely “Construction of Drainage at

Kursoo Padshahi Bagh, Tehsil South”, Srinagar ;

Whereas, notification as required under sub-section

(1) of

section 4 of the Land Acquisition Act, 1990 Svt. was issued by

District Collector, Srinagar vide his No. DCS/LAS/1233/70-79

dated 11-06-2014 ;

Whereas, Government has delegated powers of authorization and

declaration under sections 6&7 of the Land Acquisition Act, 1990 Svt.

under SRO-235 dated 11-08-2009 ;

Whereas, the land is required for public purpose viz.

“Construction of Drainage at Kursoo Padshahi Bagh, Tehsil South”,

Srinagar, the specification of which are given below :—

Specifications

District

Tehsil

Estate/

Khasra

Area

Mouza

No.

–––––––––––––––––––––––––––––––––––––––––––––––––––––

K. M. S.

Srinagar

South

KP

167

00–05–92

Srinagar

Bagh

No. 22] The J&K Govt. Gazette, 27th Aug., 2015/5th Bhad., 1933. 273

–––––––—––––––––––––––––––––––––––––––––––––––––––––––––———

Now, therefore, it is hereby declared under section 6 of the

said Act, that the land aforementioned is required for public purpose.

Further, the Collector, Land Acquisition (Assistant Commissioner,

Revenue), Srinagar is directed under section 7 of the said Act, to

take proceedings with acquisition of the land specifications which are

given above.

(Sd.).......................

District Collector,

Deputy Commissioner,

Srinagar.

————

GOVERNMENT OF JAMMU AND KASHMIR,

OFFICE OF THE DEPUTY COMMISSIONER,

GANDERBAL.

(Mini Secretariat)

Subject :—Acquisition of additional land for widening of SSG Road in

Estate Kangan, Tehsil Kangan.

————

In exercise of the powers vested in me under section 4 (1) of J&K

Land Acquisition Act, Samvat 1990, I, Naseer Ahmad Wani, Collector,

Land Acquisition (Assistant Commissioner, Revenue), Ganderbal do hereby

notify that the land particulars of which are given below for public purpose

namely widening of SSG road in Estate Kangan, Tehsil Kangan :—

Particulars of land

District

Tehsil

Village

Survey

Area

Nos.

Involved

–––––––––––––––––––––––––––––––––––––––––––––––––––––

1

2

3

4

5

–––––––––––––––––––––––––––––––––––––––––––––––––––––

K. M. S.

Ganderbal

Kangan

Kangan

261

min

00–03–4½

274 The J&K Govt. Gazette, 27th Aug., 2015/5th Bhad., 1937. [ No. 22

––––––––––––––––––––––––––––––––––––––––––––––––—–––————

1455/262

00–11–00

281

00–06–02

280

00–11–06

1149/917

00–12–00

906

min

01–13–06

1297/920

00–11–06

250

00–07–03

1755/472

min

00–00–06

1756/472

00–01–00

1164/940/910

00–03–00

507

min

00–16–06

————

Total

05–18–3½

————

Having notified the land above, objections, if any, in terms of

sections 5&5 (A) of the J&K Land Acquisition Act, Samvat 1990

shall be filed by the land owners/other interested persons before the

undersigned within fifteen days from the publication of this notification

in the Print Media. No objections shall be entertained after the

stipulated time.

(Sd.)........................

Collector, Land Acquisition,

Assistant Commissioner (Rev.),

Ganderbal.

————

1

2

3

4

5

–––––––––––––––––––––––––––––––––––––––––––––––––––––

K. M. S.

No. 22] The J&K Govt. Gazette, 27th Aug., 2015/5th Bhad., 1933. 275

–––––––—––––––––––––––––––––––––––––––––––––––––––––––––———

GOVERNMENT OF JAMMU AND KASHMIR,

COMMERCIAL TAXES DEPARTMENT,

OFFICE OF THE COMMER4CIAL TAXES OFFICER,

KARGIL, LADAKH.

Notification No. 03 of 2015

Dated 19-05-2015.

It has been reported by M/s. Haidary Construction Company,

Baroo Colony, Kargil bearing TIN 0118-301-1449 that he has lost a

blank declaration C-Form and the matter stands published in the

“Kashmir Times dated 03-06-2014”. The dealer has also furnished

an indemnity bond in this regard which is placed on record file. The

detail of lost C-Form is as under :—

S. No.

C-Form No.

Status

——————————————

01.

04V-682479

Blank

Accordinly, the above detailed C-From is declared as invalid and

obsolete for the purpose of section 8 (4) of the CST Act, 1956 and

the dealers are cautioned against accepting the said forms for the

purpose of trade and finder, if any, may please return the same to

the undersigned.

Any one fraudulently found using the said lost C-Form shall bind

himself liable for action in accordance with the provisions of the CST

Act, 1956 and the rules framed thereunder.

(Sd.) M. FAROOQ AHMAD,

Assessing Authority,

Commercial Taxes

Circle, Kargil.

————

276 The J&K Govt. Gazette, 27th Aug., 2015/5th Bhad., 1937. [ No. 22

––––––––––––––––––––––––––––––––––––––––––––––––—–––————

THE JAMMU AND KASHMIR STATE BOARD OF SCHOOL

EDUCATION, NEW CAMPUS, BEMINA, SRINAGAR.

Notice for General Public

The candidate whose particulars are mentioned below is

claiming to have lost/gutted his Original and as well as Duplicate

Qualification Certificate/s issued by J&K State Board of School

Education, under Serial Nos. 2012109 & 001264 respectively, with

following particulars :—

1.

Name

:

Zahoor Ahmad Khanday

2.

Parentage

:

Ali Mohd Khanday

3.

Residence

:

Gousa Colony, Bemina

4.

Date of Birth

:

05-09-1985

5.

Roll No.

:

824496

6.

Session

:

2003, Annual

7.

Result

:

Passes

Now, the candidate has applied for “2nd Duplicate Qualification

Certificate”. Before, the same is processed and provided to the

concerned candidate, any person/s having any objections in this regard,

may please file the same before the Secretary, BOSE or to the

undersigned within a period of seven days from the date of issue

of this notice.

Besides, the above referred “Both Qualification Certificates” be

treated as cancelled.

(Sd.)...............................

Assistant/Deputy Secretary,

(Certificates), K. Division.

________

No. 22] The J&K Govt. Gazette, 27th Aug., 2015/5th Bhad., 1933. 277

–––––––—––––––––––––––––––––––––––––––––––––––––––––––––———

NOTICE

I, Manisha Devi D/o Narinder Kumar R/o Main Chowk, Chinore,

Roop Nagar, Jammu wants to correct the name of my father in my

10th Class (Session 2000, Roll No. 2130648) and 12th Class

(Session 2002, Roll No. 2229676) Mark Sheets of CBSE Board. The

correct name of my father is Narinder Kumar whereas wrongly spelled

as Narindra Kumar in all my above documents. So objections, if any,

regarding name correction as Narinder Kumar may be filed to the

concerned authorities.

————

NOTICE

I have lost my I. T. I. Certificate under Roll No. 1816, Session

July, 1983. Now, I am applying for its duplicate. If anybody has any

objection in this regard he/she may contact I. T. I., Srinagar within

seven days from the publication of this notice after that no objection

will be entertained.

ROSHAN LAL BHAT,

S/o Radha Krishan Bhat

R/o Zewan,

P/O Pantha Chowk,

District Srinagar.

————

NOTICE

I, Rifat Khan W/o Sajad Khan D/o Ghulam Nabi Basu

R/o Bul-Bul, Lanker, Nawa Kadal, Srinagar wants to correct the

name of my father as Ghulam Nabi Basu instead of Ghulam Nabi

Khan which is wrongly written in application form and actual date

of birth is 11th January, 1972 instead of 11th January, 1970 as per

Income Tax Department record. Any person having any objection

in this regard may kindly be conveyed to the concerned UTIITSL,

PAN Section, Navi Mumbal within seven days from the publication

of this notice.

_____

278 The J&K Govt. Gazette, 27th Aug., 2015/5th Bhad., 1937. [ No. 22

––––––––––––––––––––––––––––––––––––––––––––––––—–––————

GOVERNMENT OF JAMMU AND KASHMIR,

OFFICE OF THE DEPUTY COMMISSIONER,

GANDERBAL.

(Mini Secretariat)

Subject :—Acquisition of land for upgradation/widening of Beehama-

Safapora Road in Estate Pahlipora, Tehsil Lar, District Ganderbal.

Reference :—1. Executive Engineer (R&B) Division, Ganderbal letter

No. 2934-35 dated 20-05-2015.

2. Tehsildar Lar Office letter No. 578/OQ/TL dated

29-03-2015.

————

In exercise of the powers vested in me under section 4 (1) of J&K

Land Acquisition Act, Samvat 1990, I, Naseer Ahmad Wani, Collector,

Land Acquisition (Assistant Commissioner, Revenue), Ganderbal do hereby

notify that the land particulars of which are given below for public purpose

namely widening of Beehama-Safapora Road in Estate Pahlipora, Tehsil

Lar, District Ganderbal —

Particulars of land

District

Tehsil

Village

Survey

Area

Nos.

involved

–––––––––––––––––––––––––––––––––––––––––––––––––––––

K. M. S.

Ganderbal

Lar

Pahlipora

420

min

00–00–05

422

min

00–12–00

425

00–14–08

427

min

00–04–1½

454

00–08–04

429

01–04–2½

————

Total

02–04–03

————

No. 22] The J&K Govt. Gazette, 27th Aug., 2015/5th Bhad., 1933. 279

–––––––—––––––––––––––––––––––––––––––––––––––––––––––––———

Having notified the land above, objections, if any, in terms of

sections 5&5 (A) of the J&K Land Acquisition Act, Samvat 1990

shall be filed by the land owners/other interested persons before the

undersigned within fifteen days from the publication of this notification

in the Print Media. No objections shall be entertained after the

stipulated time.

(Sd.)........................

Collector, Land Acquisition,

Assistant Commissioner (Rev.),

Ganderbal.

————

CORRECTION OF NAME

The name of my father in my class 10th certificate (under Roll

No. 2255743, Registration No. C113/24026/0008 of Session 2011-2013)

has been erroneously written as Samadulla Mir while as his actual

name stands for Abdul Samad Mir. Now, I have applied for its

correction. Anybody having objections may file the same to Kendra

Vidyalaya School, Gulmarg, Baramulla within 7 days from the date

of publication of this notice. No objection shall be accepted after that.

Mohammad Rafiq Mir

S/o Abdul Samad Mir

R/o Ratnipora, Tangmarg,

District Baramulla.

280 The J&K Govt. Gazette, 27th Aug., 2015/5th Bhad., 1937. [ No. 22

––––––––––––––––––––––––––––––––––––––––––––––––—–––————

THE

JAMMU AND KASHMIR GOVERNMENT GAZETTE

––––––––––––––––––––––––––––––––––––––––––––––––––––––

Vol. 128] Srinagar, Thu., the 27th Aug., 2015/5th Bhad., 1937. [ No. 22

––––––––––––––––––––––––––––––––––––––––––––––––––––––

Separate paging is given to this part in order that it may be filed as a

separate compilation.

––––––––––––––––––––––––––––––––––––––––––––––––––––––

ADVERTISEMENTS–C

––––––

GOVERNMENT OF JAMMU AND KASHMIR,

DIRECTORATE OF STATIONERY AND OFFICE SUPPLIES,

J&K, SRINAGAR.

Abbreviated Tender Notice

Sealed tenders affixed with Revenue Stamps worth Rs. 5/- (Rupees

five only) are invited for and on behalf of the Governor of Jammu and

Kashmir for Rate Contract of Lifting of Waste Paper for Jammu Division

only for the year 2015-16 as per below mentioned schedule :–––

Tender Notice

Cost of

Last Date

Last Date

Likely to

No. & Date

Tender

for Sale of

for Receipt

be opened

Tender

of Tender

on

–––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––

Rate Contract for

Rs. 100/-

28-08-2015

01-09-2015

02-09-2015

Lifting of Waste Paper

(Rupees one up to 2.00

up to 1.00

11.30 A. M.

for Jammu Division

hundred

P. M.

P. M.

NIT No. DSS/CPC/29

only)

of 2015 dated

07-08-2015

The detailed tender notice containing terms and conditions of the

aforesaid NIT’s can be had from the Office of the Assistant Director,

Stationery and Office Supplies, Kachi Chawani, Jammu.

(Sd.) KHILARI LAL,

Member-Secretary,

Central Purchase Committee Dte.

of Sty. and Govt. Presses

, Jammu/Srinagar,

J&K, Srinagar.

96 The J&K Govt. Gazette, 27th Aug., 2015/5th Bhad., 1937. [ No. 22

––––––––––––––––––––––––––––––––––––––––––––––––—–––————

SUPPLEMENTARY—C

————

GOVERNMENT OF JAMMU AND KASHMIR,

OFFICE OF THE GENERAL MANAGER,

GOVERNMENT PRESS, SRINAGAR.

Short Tender Notice

Sealed short term tenders affixed with revenue stamps of Rs. 6/- are

invited from the interesting parties for providing and fitting of new self (lucas-

TVS-130 PE), 24 Volts D. C. for 160 KVA Generating Set. The tenders

should reach the office of the undersigned by or before 26-08-2015 up to

1.00 P. M. Tenders are likely to be opened on the same day by this

department. The interesting parties should quote their rates including

providing and fitting F. O. R. Government Press, Srinagar and inclusive of

all charges and taxes. The payment to the approved tenderer shall be

made after completion of job subject to verification by the department.

The successful tenderer shall have to complete the job within 10 days.

Before submission of tenders, the interesting parties are advised to inspect

the job on any working day during office hours and deposit Rs. 50/- non-

refundable in this press as tender cost up to 26-08-2015 till 12 Noon.

The Purchase Committee of this department reserves the right to accept

or reject any or all tenders without assigning any reasons thereof. The

tenderer shall be personally wholly and solely responsible for reasonability

of rates. The interesting parties are requested to attach a CDR minimum

of 2% of their respective offers duly pledged to General Manager,

Government Press, Srinagar. The approved tenderers shall have to furnish

Guarantee/Warranty for satisfactory working as per manufacturing

company.

(Sd.) .........................

General Manager.

No. 22] The J&K Govt. Gazette, 27th August, 2015/5th Bhad., 1937.1

–––––––––––––––––––––––––––––––––––—–––––––––––––––––––––––––

GOVERNMENT OF JAMMU AND KASHMIR

CIVIL SECRETARIAT––HOME DEPARTMENT

Notification

Srinagar, the 23rd July, 2015.

SRO-233.––In exercise of the powers conferred by clause (o) of

sub-section (1) of section 4 of the Code of Criminal Procedure, Samvat

1989, and in partial modification of previous notification(s) issued on the

subject, the Government hereby exclude the areas of Village Sadoora from

the jurisdiction of Police Station, Qazigund, District Kulgam and include the

same under the jurisdiction of Police Station, Anantnag, District Anantnag.

By order of the Government of Jammu and Kashmir.

(Sd.) R. K. GOYAL, IAS,

Principal Secretary to the Government,

Home Department.

EXTRAORDINARY

REGD. NO. JK—33

PART I––B

Jammu and Kashmir Government––Notifications.

———–

No. 17-a]

The J&K Govt. Gazette, 23rd July, 2015/1st Srav., 1937.

Thu.

––––––––––––––––––––––––––––––––––––––––––––––—–––—————

GOVERNMENT OF JAMMU AND KASHMIR

CIVIL SECRETARIAT––GENERAL ADMINISTRATION

DEPARTMENT

Notification

Srinagar, the 23rd July, 2015.

SRO-234.––In exercise of the powers conferred by sub-section (1)

of section 129 of the Constitution of Jammu and Kashmir, the Governor is

pleased to appoint Mr. Abdul Latief Deva, as Chairman of the Jammu and

Kashmir Public Service Commission.

By order of the Governor.

(Sd.) GAZZANFER HUSSAIN,

Commissioner/Secretary to the Government,

General Administration Department.

EXTRAORDINARY

REGD. NO. JK—33

PART I––B

Jammu and Kashmir Government––Notifications.

———–

No. 17-b]

The J&K Govt. Gazette, 23rd July, 2015/1st Srav., 1937.

Thu.

––––––––––––––––––––––––––––––––––––––––––––––—–––—————

GOVERNMENT OF JAMMU AND KASHMIR

CIVIL SECRETARIAT––GENERAL ADMINISTRATION

DEPARTMENT

Notification

Srinagar, the 23rd July, 2015.

SRO-235.––In exercise of the powers conferred by sub-section (1)

of section 129 of the Constitution of Jammu and Kashmir, the Governor is

pleased to appoint the following persons as members of the Jammu and

Kashmir Public Service Commission :––

1. Mr. Tashi Dorjee

2. Mr. Lal Chand

THE

JAMMU & KASHMIR GOVERNMENT GAZETTE

Vol. 128] Srinagar, Thu., the 23rd July, 2015/1st Srav., 1937. [No. 17-c

Separate paging is given to this part in order that it may be filed as a

separate compilation.

PART I––B

Jammu and Kashmir Government––Notifications.

———–

EXTRAORDINARY

REGD. NO. JK—33

3. Mr. Jaipal Singh

4. Mr. Ali Asgar Choudhary

5. Prof. (Dr.) Posh Charak

6. Prof. Mushtaq Ahmad Wani

7. Mr. Mushtaq Ahmed Lone

8. Mr. Suresh Kumar Sharma

By order of the Governor.

(Sd.) GAZZANFER HUSSAIN,

Commissioner/Secretary to the Government,

General Administration Department.

2

The J&K Govt. Gazette, 23rd July, 2015/1st Srav., 1937.

[No. 17-c

––––––––––––––––––––––––––––––––––––––––––––––—–––—————

GOVERNMENT OF JAMMU AND KASHMIR

CIVIL SECRETARIAT––SCHOOL EDUCATION DEPARTMENT

Notification

Srinagar, the 23rd July, 2015.

SRO-236.––In exercise of the powers conferred by sub-section (1)

of section 12 of the Jammu and Kashmir Board of School Education

Act, 1975 (Act No. XXVIII of 1975), and in supersession of all the previous

notifications issued on the subject, the Government hereby appoints Prof.

Zahoor Ahmad Chatt, Principal, Amar Singh College, Srinagar as Chairman

of the Jammu and Kashmir Board of School Education for a period of three

years.

By order of the Government of Jammu and Kashmir.

(Sd.) SHALEEN KABRA,

Commissioner/Secretary to the Government.

EXTRAORDINARY

REGD. NO. JK—33

PART I––B

Jammu and Kashmir Government––Notifications.

———–

No. 17-d]

The J&K Govt. Gazette, 23rd July, 2015/1st Srav., 1937.

Thu.

––––––––––––––––––––––––––––––––––––––––––––––—–––—————

GOVERNMENT OF JAMMU AND KASHMIR

CIVIL SECRETARIAT––HOUSING AND URBAN

DEVELOPMENT DEPARTMENT

Notification

Srinagar, the 24th July, 2015.

SRO-237.––In exercise of the powers conferred by sub-section (1)

of section 3 of the Jammu and Kashmir Development Act, 1970 (XIX of

1970), the Government hereby declare the area specified in Annexure to

THE

JAMMU & KASHMIR GOVERNMENT GAZETTE

Vol. 128] Srinagar, Fri., the 24th July, 2015/2nd Srav., 1937. [No. 17-e

Separate paging is given to this part in order that it may be filed as a

separate compilation.

PART I––B

Jammu and Kashmir Government––Notifications.

———–

EXTRAORDINARY

REGD. NO. JK—33

this notification to be the local area for the purposes of the said Act and

constitute therefore a authority to be known as “Shopian Development

Authority”.

By order of the Government of Jammu and Kashmir.

(Sd.) ........................................

Commissioner/Secretary to Government.

Housing and Urban Deoelopment Department.

––––––

2

The J&K Govt. Gazette, 24th July, 2015/2nd Srav., 1937.

[No. 17-e

––––––––––––––––––––––––––––––––––––––––––––––—–––—————

Annexure “A” to Notification SRO-237 dated 24th July, 2015.

(For Master Plan, Shopian)

S. No.

Town/Village Settlements

Khasra Number

––––––––––––––––––––––––––––––––––––––––––––––––––––––

1

2

3

––––––––––––––––––––––––––––––––––––––––––––––––––––––

M. C. Limit, Shopian :

1.

Hergam

1-1431

2.

Batapora

1-1450

3.

Bongam

1-1281

Revenue Village outside M. C Limits :

1.

Arahama

1-259

2.

Habdpora

1-200

3.

Pahanoo

1-556

4.

Aglar

1-312

5.

Pinjora

1-2300

6.

Ganowpora Arsh

1-631

7.

Largam

1-255

8.

Lawahind

1-459

9.

Memandar

1-1220

10.

Gagren

1-450

11.

Cheki Shamsi Pora

1-100

12.

Gund-i-Hadoo

1-595

13.

Chowgam

1-290

No. 17-e]

The J&K Govt. Gazette, 24th July, 2015/2nd Srav., 1937.

3

–––––––—–––––––––––––––––––––––––––––––––––––––––––––––———

14.

Hirpora

1-2978

15.

Kanipora

1-200

16.

Dagam

1-332

17.

Sherabad

1-274

18.

Kanipora

1-329

1

2

3

––––––––––––––––––––––––––––––––––––––––––––––––––––––

4

The J&K Govt. Gazette, 24th July, 2015/2nd Srav., 1937.

[No. 17-e

––––––––––––––––––––––––––––––––––––––––––––––—–––—————

GOVERNMENT OF JAMMU AND KASHMIR

CIVIL SECRETARIAT––HOUSING AND URBAN

DEVELOPMENT DEPARTMENT

Notification

Srinagar, the 27th July, 2015.

SRO-238.––In exercise of the powers conferred by section 4 of the

Jammu and Kashmir Development Act, 1970 (XIX of 1970), the

Government hereby appoint the following as members of the Shopian

Development Authority, constituted vide Notification SRO-237 dated

24th July, 2015 :––

1.

Hon’ble Minister for Housing and Urban

Chairman

Development Department

THE

JAMMU & KASHMIR GOVERNMENT GAZETTE

Vol. 128] Srinagar, Mon., the 27th July, 2015/5th Srav., 1937. [No. 17-f

Separate paging is given to this part in order that it may be filed as a

separate compilation.

PART I––B

Jammu and Kashmir Government––Notifications.

———–

EXTRAORDINARY

REGD. NO. JK—33

2.

Member Legislative Assembly, Shopian

Member

3.

District Development Commissioner,

Member-Secretary

Shopian (CEO, Shopian Dev. Authority)

4.

Director, Urban Local Bodies Kashmir

Member

5.

Chief Town Planner, Town Planning

Member

Organization, Kashmir

6.

Regional Director, Directorate of

Member

Environment and Remote Sensing

7.

Conservator of Forests (South Kashmir)

Member

8.

President/Administrator, Municipal

Member

Council, Shopian

9.

Superintending Engineer, R&B, Shopian

Member

10.

Superintending Engineer, PHE, Shopian

Member

11.

Superintending Engineer, EM & RE,

Member

Shopian

12.

Executive Engineer, Town and

Member

Drainage Division, Directorate of

Urban Local Bodies, Kashmir

By order of the Government of Jammu and Kashmir.

(Sd.) ........................................

Commissioner/Secretary to Government.

Housing and Urban Deoelopment Department.

2

The J&K Govt. Gazette, 27th July, 2015/5th Srav., 1937.

[No. 17-f

––––––––––––––––––––––––––––––––––––––––––––––—–––—————

GOVERNMENT OF JAMMU AND KASHMIR

CIVIL SECRETARIAT––HOME DEPARTMENT

Notification

Srinagar, the 29th July, 2015.

SRO-239.––In exercise of powers conferred by section 22 of the

Jammu and Kashmir Requisitioning and Acquisition of Immovable Property

Act, 1968, the Government hereby direct that for sub-rule (2-A) of rule 9

of the Jammu and Kashmir Requisitioning and Acquisition of Immovable

Property Rules, 1969, the following shall be substituted, namely :––

“(2-A) In determining the compensation of agricultural and other

lands under clause (a) of sub-section (2) of section 8 of the

Act, the Competent Authority shall have regard to the following

THE

JAMMU & KASHMIR GOVERNMENT GAZETTE

Vol. 128] Srinagar, Wed., the 29th July, 2015/7th Srav., 1937. [No. 17-g

Separate paging is given to this part in order that it may be filed as a

separate compilation.

PART III

Laws, Regulations and Rules passed thereunder.

———–

EXTRAORDINARY

REGD. NO. JK—33

rates of rent with effect from 16-02-2013, which the

Government consider minimum for different categories of land in

the State :––

S. No.

Category of land

Rate of rent per kanal

per annum

––––––––––––––––––––––––––––––––––––––––––––––––––––––

1.

Class-I :

Rs. 5,578.00

(a) Irrigated

2.

Class-II :

(a) Irrigated

Rs. 4,800.00

(b) Unirrigated

Rs. 2,293.00

3.

Class-III :

(a) Uncultivable

Rs. 1,476.00

4.

Fruit Bearing Orchard

Rs. 10,500.00

5.

Land falling under Jammu Municipal

Rs. 35,438.00

Corporation/Srinagar and Jammu/

Srinagar Cantonments areas

6.

Lands falling under Municipal Councils

Rs. 17,719.00

(including Poonch Municipal Council)

7.

Lands falling under Municipal

Rs. 14,175.00

Committees

By order of the Government of Jammu and Kashmir.

(Sd.) R. K GOYAL, IAS,

Principal Secretary to Government.

Home Department.

2

The J&K Govt. Gazette, 29th July, 2015/7th Srav., 1937.

[No. 17-g

––––––––––––––––––––––––––––––––––––––––––––––—–––—————

GOVERNMENT OF JAMMU AND KASHMIR

CIVIL SECRETARIAT––HOSPITALITY AND PROTOCOL

DEPARTMENT

Notification

Srinagar, the 29th July, 2015.

SRO-240.––In exercise of the powers conferred by the proviso to

section 124 of the Constitution of Jammu and Kashmir, the Governor hereby

makes the following amendment in Schedule-I of the Jammu and

Kashmir Hospitality and Protocol (Subordinate) Service Recruitment

Rules, 2008 :––

“Entry 24 and entry 34 shall be substituted by the following entries,

namely :––

S.

Designation

Pre-revised

Corresponding Revises

No. of

No.

of the post

Pay Scale

Pay Scale/

posts

Pay Band+Grade Pay

––––––––––––––––––––––––––––––––––––––––––––––––––––––

24.

Butler

4000-6000

5200-20200+GP 2400

08

34.

Table Boy

3050-4910

5200-20200+1900

30

By order of the Governor.

(Sd.) ..............................

Principal Secretary to Government,

Hospitality and Protocol Department.

EXTRAORDINARY

REGD. NO. JK—33

PART III

Laws, Regulations and Rules passed thereunder.

———–

No. 17-h]

The J&K Govt. Gazette, 29th July, 2015/7th Srav., 1937.

Wed.

––––––––––––––––––––––––––––––––––––––––––––––—–––—————

GOVERNMENT OF JAMMU AND KASHMIR

CIVIL SECRETARIAT––FINANCE DEPARTMENT

Notification

Srinagar, the 29th July, 2015.

SRO-241.––In exercise of the powers conferred by clause (a) of

section 9 of the Stamps Act, Svt. 1977 (XL of 1977), the Government

hereby remit the stamp duty chargeable under the said Act for an amount

up to rupees three lacs in case of the loans advanced by the Financial

Institutions to Self Help Groups under National Rural Livelihood Mission

under the scheme UMEED.

By order of the Government of Jammu and Kashmir.

(Sd.) NAVIN K. CHOUDHARY, IAS,

Commissioner/Secretary to Government,

Finance Department.

EXTRAORDINARY

REGD. NO. JK—33

PART I––B

Jammu and Kashmir Government––Notifications.

———–

No. 17-i]

The J&K Govt. Gazette, 29th July, 2015/7th Srav., 1937.

Wed.

––––––––––––––––––––––––––––––––––––––––––––––—–––—————

GOVERNMENT OF JAMMU AND KASHMIR

CIVIL SECRETARIAT––FINANCE DEPARTMENT

Notification

Srinagar, the 29th July, 2015.

SRO-242.––In exercise of the powers conferred by sub-section (2)

of section 3 of the Jammu and Kashmir Entry Tax on Goods Act, 2000

(Act No. IV of 2000), the Government hereby exempt from payment of

entry tax, leviable under the said Act, the Bio-Toilet samples donated free

of cost to be imported into the State by the Public Works (R&B) Department

for Government use.

By order of the Government of Jammu and Kashmir.

(Sd.) NAVIN K. CHOUDHARY, IAS,

Commissioner/Secretary to Government,

Finance Department.

EXTRAORDINARY

REGD. NO. JK—33

PART I––B

Jammu and Kashmir Government––Notifications.

———–

No. 17-j]

The J&K Govt. Gazette, 29th July, 2015/7th Srav., 1937.

Wed.

––––––––––––––––––––––––––––––––––––––––––––––—–––—————

GOVERNMENT OF JAMMU AND KASHMIR

CIVIL SECRETARIAT––REVENUE DEPARTMENT

Notification

Srinagar, the 30th July, 2015.

SRO-243.––In exercise of the powers conferred by clause (b) of

section 3 of the Jammu and Kashmir Grant of Permanent Resident

Certificate (Procedure) Act, 1963 (Act No. XIII of 1963), and in supersession

of all the notifications issued in this behalf, the Government hereby appoint

Mr. Mohammed Mumtaz Ali (KAS), Additional Deputy Commissioner,

Rajouri to be the competent authority for purposes of the said Act, within

the territorial jurisdiction of Sub-Divisions of Nowshera and Sunderbani of

District Rajouri.

By order of the Government of Jammu and Kashmir.

(Sd.) MUHAMMED AFZAL, IAS,

Secretary to Government,

Revenue Department.

EXTRAORDINARY

REGD. NO. JK—33

PART I––B

Jammu and Kashmir Government––Notifications.

———–

No. 18-a]

The J&K Govt. Gazette, 30th July, 2015/8th Srav., 1937.

Thu.

––––––––––––––––––––––––––––––––––––––––––––––—–––—————

JAMMU AND KASHMIR STATE ELECTRICITY REGULATORY

COMMISSION, SRINAGAR.

Notification No. 43-JKSERC of 2015 dated 10-07-2015.

JKSERC (Terms and Conditions of Intra-State Open Access)

Regulations, 2015.

In exercise of the powers conferred by section 138, read with sections

33, 34, 36 and 71 of the Jammu and Kashmir Electricity Act, 2010

(Act XIII of 2010) and all other powers enabling it in this behalf, the Jammu

and Kashmir State Electricity Regulatory Commission (J&K SERC) hereby

makes the J&K SERC (Terms and Conditions of Intra-State Open Access)

Regulations in replacement of J&K SERC (Open Access in Intra-State

EXTRAORDINARY

REGD. NO. JK—33

THE

JAMMU & KASHMIR GOVERNMENT GAZETTE

Vol. 128] Srinagar, Fri., the 24th July, 2015/2nd Asad., 1937. [No. 17-2

Separate paging is given to this part in order that it may be filed as a

separate compilation.

PART III

Laws, Regulations and Rules passed thereunder.

———–

Transmission and Distribution) Regulations notified on 25th January, 2006.

Following are the details of new regulations :––

CHAPTER 1

Preliminary

1. Short title, extent and commencement.––(1) These regulations

may be called the Jammu and Kashmir State Electricity Regulatory

Commission (Terms and Conditions of Intra-State Open Access)

Regulations, 2015.

(2) These regulations shall come into force from the date of publication

in the Government Gazette.

2. Scope.––These regulations shall apply to open access for use of

Intra-State transmission system and distribution systems in the State, including

when such system is used in conjunction with Inter-State transmission

system.

3. Definitions.––In these regulations, unless the context otherwise

requires,––

(1) “Act” means the Jammu and Kashmir State Electricity

Act, 2010 (Act No. XIII of 2010) ;

(2) “Allotted Capacity” means the power transfer in MW between

the specified point(s) of injection and point(s) of drawal allowed

to a long-term/medium-term customer on the Intra-State

transmission system and the expression “allotment of capacity”

shall be construed accordingly ;

(3) “Applicant” means a consumer, trader, distribution licensee or

a generating station who has applied seeking connectivity or

open access as the case may be ;

2

The J&K Govt. Gazette, 24th July, 2015/2nd Asad., 1937.

[No. 17-2

––––––––––––––––––––––––––––––––––––––––––––––—–––—————

(4) “Central Commission” means the Central Electricity Regulatory

Commission referred to in section 76 of the Indian Electricity

Act 2003 ;

(5) “Commission” means the Jammu and Kashmir State Electricity

Regulatory Commission referred to in section 64 of the Act ;

(6) The word “consumer” shall carry the same meaning as in the

Act, but shall be restricted to such consumers within the

State of Jammu and Kashmir to whom these regulations will

apply ;

(7) “Contracted load” means the load in kW/HP/kVA (kilo Watt/

Horse Power/kilo Volt Ampere) which the distribution licensee

has agreed to supply from time to time subject to the governing

terms and conditions and is different from the connected

load ;

(8) “Composite Operating Charges or Operating Charges” means

the charges payable by an Open Access Customers for each

transactions to the SLDC as determined by the Commission

and includes the fee for scheduling, system operation, energy

accounting, fee for effecting revision in schedule on bona fide

grounds and collection and disbursement of charges ;

(9) “Day” means a day starting at 0000 hours and ending at

2400 hours ;

(10) “Distribution licensee” means any person licensed under section

14 of the Act for distribution and retail supply of electricity in

the State of Jammu and Kashmir ;

(11) “Distribution System” means a system or wires and associated

facilities between delivery points on the transmission lines or

generating station and the point of connection to the installation

of the consumers ;

No. 17-2]

The J&K Govt. Gazette, 24th July, 2015/2nd Asad., 1937.

3

–––––––—–––––––––––––––––––––––––––––––––––––––––––––––———

(12) “Embedded open access consumer (or in short embedded

consumer)” means consumer who has a supply agreement with

the distribution licensee in whose area of supply the consumer

is located and avails the option of drawing part or full of its

demand from any other person under open access, in any one

or more time slots during a day or more, in any month or more

during the year, without ceasing to be a consumer of the said

distribution licensee and continues to pay monthly demand

charges and other charges as per rate schedule applicable to

relevant category ;

(13) “IEGC” means Indian Electricity Grid Code Specified by

Central Electricity Regulatory Commission under clause (h) of

sub-section (1) of section 79 of the Indian Electricity Act, 2003

and as amended from time to time ;

(14) “Imbalance” in a time block for a generating station means its

total actual generation minus its total scheduled generation and

for a consumer or buyer means its total drawal minus its total

scheduled drawal ;

(15) “Limited short-term open access consumer” means consumer

who has a supply agreement with the distribution licensee in

whose area of supply the consumer is located and avails open

access in distribution and/or transmission system only during

pre-scheduled load shedding due to shortage of power ;

(16) “Long-term access” means the right to use the Intra-State

transmission system or distribution system for a period

exceeding 12 years but not exceeding 25 years ;

(17) “Medium-term open access” means the open access for a

period exceeding three months but not exceeding three years ;

(18) “Month” means a calendar month as per the Gregorian

Calendar ;

4

The J&K Govt. Gazette, 24th July, 2015/2nd Asad., 1937.

[No. 17-2

––––––––––––––––––––––––––––––––––––––––––––––—–––—————

(19) “Nodal agency” means the nodal agency defined in Regulation

13(2) of these regulations ;

(20) “Open access” means the non-discriminatory provision for

the use of transmission lines or distribution system or associated

facilities with such lines or system by any licensee or consumer

or a generating station in accordance with these regulations

and includes long-term access, medium-term open access and

short-term open access ;

(21) “Open access customer (in short customer)” means a

consumer, trader, distribution licensee or a generating station

who has been granted open access under these regulations ;

(22) “Open access consumer” means a consumer, who has been

granted open access under these regulations ;

(23) “Reserved Capacity” means the power transfer in MW

between the specified point(s) of injection and point(s) of drawal

allowed to a short-term customer on the transmission/

distribution system depending on availability of transmission/

distribution capacity and the expression “reservation of

capacity” shall be construed accordingly ;

(24) “Short-term open access” means open access for a period up

to one month at a time ;

(25) “SLDC” means the State Load Dispatch Centre established

under sub-section (1) of section 26 of the Act ;

(26) “State” means the State of Jammu and Kashmir ;

(27) “State Grid Code” means the State Grid Code specified by the

Commission under clause (h) of sub-section (1) of section 71

of the Act, applicable on the date of commencement of these

regulations and as amended from time to time ;

No. 17-2]

The J&K Govt. Gazette, 24th July, 2015/2nd Asad., 1937.

5

–––––––—–––––––––––––––––––––––––––––––––––––––––––––––———

6

The J&K Govt. Gazette, 24th July, 2015/2nd Asad., 1937.

[No. 17-2

––––––––––––––––––––––––––––––––––––––––––––––—–––—————

(28) “State Transmission Utility (STU)” means the Government

Company/Corporation notified by the State Government under

sub-section (1) of section 33 of the Act ;

(29) “Transmission licensee” means any person licensed under

Part IV of the Act for transmission of electricity in the State of

Jammu and Kashmir ;

(30) “Transmission System Segment” means a part or whole of the

transmission system from the point of injection to the point of

drawal ;

(31) “Wheeling” means the operation whereby the distribution

system and associated facilities of a transmission licensee or

distribution licensee, as the case may be, are used by another

person for the conveyance of electricity on payment of charges

to be determined under section 56 of the Act ;

(32) All words and expressions used and not defined in these

regulations but defined in the Act or IEGC or the State Grid

Code, or Supply Code shall have the meaning assigned to them

under the Act or the IEGC or the State Grid Code, or Supply

Code as the case may be ;

(33) The General Clauses Act, 1977 Svt. (Act XX), as amended

from time to time shall apply for the interpretation of these

regulations as it applies for interpretation of an Act of

Legislature.

CHAPTER 2

Connectivity

4. Connectivity.––(1) A consumer having load of 10 MW and

above or a generating station having capacity of 10 MW and above shall be

eligible to obtain connectivity at 132 kV or above, unless already connected,

and shall apply for connectivity, in accordance with the provisions in this

chapter.

No. 17-2]

The J&K Govt. Gazette, 24th July, 2015/2nd Asad., 1937.

7

–––––––—–––––––––––––––––––––––––––––––––––––––––––––––———

(2) A consumer having load of less than 10 MW or a generating

station having installed capacity not exceeding 10 MW shall be eligible to

obtain connectivity at 66 kV/33 kV, unless already connected, and shall

apply for connectivity as per the provisions of these regulations, in

accordance with the provisions in this chapter.

5. Application procedure for connectivity at 132 kV or

above.––(1) Applicant shall apply to the STU for connectivity in the form

prescribed in the detailed procedure to be laid down by the STU.

(2) The application shall be accompanied by a non-refundable fee of

Rs. two lakh through demand draft in favour of State Transmission Utility

payable at Jammu/Srinagar.

(3) The application for connectivity shall contain details such as,

proposed geographical location of the applicant, quantum of power to be

inter-changed that is the quantum of power to be injected in the case of a

generating station including a captive generating plant and quantum of power

to be drawn in the case of a consumer, with the Intra-State transmission

system and such other details as may be laid down by the State Transmission

Utility in the detailed procedure :

Provided that in cases where once an application has been filed and

thereafter there has been any material change in the location of the applicant

or change, by more than 10 per cent in the quantum of power to be

inter-changed with the Intra-State transmission system, the applicant shall

make a fresh application, which shall be considered in accordance with

these regulations.

6. Processing of application and grant of connectivity to STU/

transmission licensee.––(1) On receipt of the application, the STU

shall, in consultation and through coordination with SLDC and other agencies

involved in the Intra-State transmission, process the application and carry

out the necessary inter-connection study as specified in the Central

Electricity Authority (Technical Standards for Connectivity to the Grid)

Regulations, 2007, amended up-to-date.

8

The J&K Govt. Gazette, 24th July, 2015/2nd Asad., 1937.

[No. 17-2

––––––––––––––––––––––––––––––––––––––––––––––—–––—————

(2) The State Transmission Utility shall, within thirty (30) days, from

the receipt of an application under sub-regulation (1) above and after

considering all suggestions and comments received from other agencies

involved in the Intra-State transmission including State Load Despatch

Centre :––

(a) Accept the application with such modification or such conditions

as may be specified by them ;

(b) Reject the application for reasons to be recorded in writing if

such application is not in accordance with the provisions of

these regulations.

(3) In case of acceptance of an application as per clause (a) of sub-

regulation (2) above, the State Transmission Utility shall make a formal

offer to the applicant :

Provided that the State Transmission Utility shall forward a copy of

the offer to the appropriate Intra-State transmission licensee in case

connectivity is granted to the Intra-State transmission system of an

Intra-State transmission licensee other than the State Transmission Utility.

(4) The voltage level at which the applicant is offered to be connected

to the Intra-State transmission system shall be governed by Central

Electricity Authority (Technical Standards for Connectivity to the Grid)

Regulations, 2007 and prevailing guidelines adopted by the State

Transmission Utility.

(5) The State Transmission Utility shall, upon compliance of the

required conditions by the applicant and Intra-State transmission licensees

including the State Transmission Utility, shall notify the concerned applicant

that it can be connected to the Intra-State transmission system.

(6) The applicant shall sign a connection agreement with the

State Transmission Utility or Intra-State transmission licensee owning the

No. 17-2]

The J&K Govt. Gazette, 24th July, 2015/2nd Asad., 1937.

9

–––––––—–––––––––––––––––––––––––––––––––––––––––––––––———

sub-station or pooling station or switchyard or the transmission line as

identified by the STU where connectivity is being granted :

Provided that in case connectivity of a generating station, including

captive generating plant or consumer is granted to the Intra-State

transmission system of an Intra-State transmission licensee other than the

State Transmission Utility, a tripartite agreement as provided in the Central

Electricity Authority (Technical Standards for Connectivity to the Grid)

Regulations, 2007 shall be signed between the applicant, the State

Transmission Utility and such Intra-State transmission licensee :

Provided further the State Load Despatch Centre shall also be provided

with a copy of the above mentioned Connection Agreement by the STU/

Intra-State transmission licensee.

(7) While granting connectivity, the STU shall specify the name of

the sub-station or pooling station or switchyard where connectivity is to be

granted. In case connectivity is to be granted by looping-in and looping-out

of an existing or proposed line, the STU shall specify the point of connection

and name of the line at which connectivity is to be granted. The STU shall

indicate the broad design features of the dedicated transmission line and

the timeframe for completion of the dedicated transmission line.

(8) The applicant and all Intra-State transmission licensees including

the State Transmission Utility shall comply with the provisions of Central

Electricity Authority (Technical Standards for Connectivity to the Grid)

Regulations, 2007. The grant of connectivity shall not entitle an applicant to

inter-change any power with the grid unless it obtains long-term access,

medium-term open access or short-term open access in accordance with

the provisions of these regulations.

(9) A generating station, including captive generating plant which has

been granted connectivity to the grid shall be allowed to undertake testing

including full load testing by injecting its infirm power into the grid before

being put into commercial operation, even before availing any type of open

access, after obtaining permission of the State Load Despatch Centre, which

10

The J&K Govt. Gazette, 24th July, 2015/2nd Asad., 1937.

[No. 17-2

––––––––––––––––––––––––––––––––––––––––––––––—–––—————

shall keep grid security in view while granting such permission. Commercial

treatment of such infirm power from a generating station or a unit thereof,

other than those based on non-conventional energy sources, the tariff of

which is determined by the Commission, will be governed by the applicable

regulations on Terms and Conditions of Tariff. The power injected into the

grid from other generating stations as a result of such testing shall be charged

at the rates for imbalance determined by the Commission (UI rates where

rates of imbalance have not been notified by the Commission).

(10) An applicant may be required by the State Transmission Utility

to construct a dedicated line to the point of connection to enable connectivity

to the grid, unless exempted by the Commission for reasons to be recorded

in writing. The cost of such line shall be borne by the applicant.

7. Application procedure for connectivity to distribution system

by a generating station.––(1) All eligible generating stations including a

captive generating plant, seeking connectivity to the distribution system,

shall apply to the distribution licensee for connectivity in the form prescribed

in the procedure to be laid down by the distribution licensee.

(2) The application shall be accompanied by a non-refundable fee of

Rs. two lakh through demand draft in favour of the distribution licensee

payable at Jammu/Srinagar.

(3) The application for connectivity shall contain details such as,

proposed geographical location of the generating station, quantum of power

to be injected and such other details as may be laid down by the distribution

licensee concerned in the procedure.

8. Processing of application and grant of connectivity to

distribution system by a generating station.––(1) On receipt of the

application, the distribution licensee shall, in consultation and through

coordination with State Transmission Utility and SLDC process the

application and carry out the necessary inter-connection study as specified

in the Central Electricity Authority (Technical Standards for Connectivity

to the Grid) Regulations, 2007.

No. 17-2]

The J&K Govt. Gazette, 24th July, 2015/2nd Asad., 1937.

11

–––––––—–––––––––––––––––––––––––––––––––––––––––––––––———

(2) While granting connectivity, the distribution licensee shall specify

the name of the sub-station or pooling station or switchyard where

connectivity is to be granted. In case connectivity is to be granted by looping-

in and looping-out of an existing or proposed line, the distribution licensee

shall specify the point of connection and name of the line at which

connectivity is to be granted.

(3) The distribution licensee shall indicate the broad design features

such as switchyard and inter-connection facility up to the point of injection

into the sub-station of the distribution licensee and the timeframe for

completion of the same. The cost of creation of these facilities shall be

borne by the generating company. In cases where augmentation of the

distribution licensee’s sub-station is involved, the generating station shall

also bear the cost of bay, switchgear in the distribution licensee’s

sub-station and equipment for inter-connection of real time data to SLDC.

(4) The applicant and the distribution licensee shall comply with the

provisions of Central Electricity Authority (Technical Standards for

Connectivity to the Grid) Regulations, 2007, as amended up-to-date.

(5) The applicant shall sign a connection agreement with the

distribution licensee where connectivity is being granted.

(6) The grant of connectivity shall not entitle an applicant to

inter-change any power with the grid unless it obtains long-term access,

medium-term open access or short-term open access in accordance with

the provisions of these regulations.

(7) A generating station, including captive generating plant which

has been granted connectivity to the distribution system shall be allowed to

undertake testing including full load testing by injecting its infirm power into

the grid before being put into commercial operation, even before availing

any type of open access, after obtaining permission of the State Load

Despatch Centre and the distribution licensee, who shall keep grid security

12

The J&K Govt. Gazette, 24th July, 2015/2nd Asad., 1937.

[No. 17-2

––––––––––––––––––––––––––––––––––––––––––––––—–––—————

in view while granting such permission. Commercial treatment of such

infirm power from a generating station or a unit thereof, other than those

based on non-conventional energy sources, the tariff of which is determined

by the Commission, will be governed by the applicable regulations on Terms

and Conditions of Tariff. The power injected into the grid from other

generating stations as a result of such testing shall be charged at the rates

for imbalance determined by the Commission (UI rates where rates of

imbalance have not been notified by the Commission).

9. Application procedure for connectivity to distribution system

by a consumer.––Connectivity to distribution system by a consumer shall

be governed as per procedure laid down in J&K State Electricity Supply

Code and J&K State Distribution Code.

CHAPTER 3

General Provisions for Open Access

10. Eligibility for Open Access and conditions to be satisfied.––

(1) Subject to the provisions of these regulations, the licensees, generating

companies, captive generating plants and consumers shall be eligible for

open access to the Intra-State transmission system of the State Transmission

Utility or any transmission licensee on payment of transmission and other

charges as may be determined by the Commission in accordance with

Chapter 5 of these regulations.

(2) Subject to the provisions of these regulations, the licensees,

generating stations, captive generating plants and consumers shall be eligible

for open access to distribution system of a distribution licensee on payment

of the wheeling and other charges as may be determined by the Commission

in accordance with Chapter 5 of these regulations.

(3) Subject to the provisions of these regulations, open access shall

be permissible to the consumers, located within the area of the distribution

licensee of the State, having a contracted load of 1 (one) MW and above

and connected to the distribution system of licensee at 33 kV or above,

No. 17-2]

The J&K Govt. Gazette, 24th July, 2015/2nd Asad., 1937.

13

–––––––—–––––––––––––––––––––––––––––––––––––––––––––––———

seeking open access capacity and are connected through an independent

feeder emanating from a sub-station of licensee or industrial feeder provided

that all the consumers on such industrial feeder opt for open access and

having simultaneous schedule of drawal under such open access :

Provided that the consumers who are not on independent feeders,

shall be allowed open access subject to the condition that they agree to

rostering restrictions imposed by utility on the feeders serving them :

Provided further that duties of the distribution licensee with respect

to such open access consumers shall be of a common carrier providing

non-discriminatory open access as per section 36(3) of the Act.

(4) A person having been declared insolvent or bankrupt or having

outstanding dues against him for more than two months billing of distribution/

transmission licensee at the time of application shall not be eligible for open

access.

11. Criteria for granting long-term access or medium-term or

short-term open access.––(1) Before awarding long-term access, the

State Transmission/Distribution Utility shall have due regard to the

augmentation required for the Intra-State transmission/distribution system.

(2) Medium-term open access or short-term open access shall be

granted if the resultant power flow can be accommodated in the existing

transmission/distribution system or the transmission/distribution system under

execution :

Provided that no augmentation shall be carried out to the transmission/

distribution system for the sole purpose of granting medium-term open

access or short-term open access :

Provided further that construction of a dedicated transmission/

distribution feeder line shall not be construed as augmentation of the

transmission/distribution system for the purpose of this regulation.

14

The J&K Govt. Gazette, 24th July, 2015/2nd Asad., 1937.

[No. 17-2

––––––––––––––––––––––––––––––––––––––––––––––—–––—————

CHAPTER 4

Application Procedure and Approval

12. Categories of Open Access Consumers.–––The application

procedure, application fee and the timeframe of processing request by

eligible consumers seeking open access shall be based on the following

criteria :––

(1) System to which connected––

(a) Intra-State transmission system ;

(b) Distribution system.

(2) Inter-se location of drawal and injection points––

(a) Both within the same distribution system ;

(b) Within the State but in different distribution systems ;

(c) Injection point in the Intra-State transmission system within

the State ;

(d) In different States.

(3) Duration of Open Access––

(a) Long-term access ;

(b) Medium-term open access ;

(c) Short-term open access.

13. Application procedure for Open Access.––(1) All applications

for open access shall be made in the prescribed form and submitted to the

Nodal Agency in accordance with these regulations.

(2) The Nodal Agency, application fee, documents to accompany

the application and time frame for disposal of application are specified in

the following Tables :––

No. 17-2]

The J&K Govt. Gazette, 24th July, 2015/2nd Asad., 1937.

15

–––––––—–––––––––––––––––––––––––––––––––––––––––––––––———

16

The J&K Govt. Gazette, 24th July, 2015/2nd Asad., 1937.

[No. 17-2

––––––––––––––––––––––––––––––––––––––––––––––—–––—————

No. 17-2]

The J&K Govt. Gazette, 24th July, 2015/2nd Asad., 1937.

17

–––––––—–––––––––––––––––––––––––––––––––––––––––––––––———

18

The J&K Govt. Gazette, 24th July, 2015/2nd Asad., 1937.

[No. 17-2

––––––––––––––––––––––––––––––––––––––––––––––—–––—————

No. 17-2]

The J&K Govt. Gazette, 24th July, 2015/2nd Asad., 1937.

19

–––––––—–––––––––––––––––––––––––––––––––––––––––––––––———

20

The J&K Govt. Gazette, 24th July, 2015/2nd Asad., 1937.

[No. 17-2

––––––––––––––––––––––––––––––––––––––––––––––—–––—————

No. 17-2]

The J&K Govt. Gazette, 24th July, 2015/2nd Asad., 1937.

21

–––––––—–––––––––––––––––––––––––––––––––––––––––––––––———

22

The J&K Govt. Gazette, 24th July, 2015/2nd Asad., 1937.

[No. 17-2

––––––––––––––––––––––––––––––––––––––––––––––—–––—————

14. Procedure for Long Term Access :

(1) Involving Inter-State transmission system.––Notwithstanding

anything contained in sub-regulation (2) and (3) hereinbelow, procedure for

Inter-State long-term access shall be as per Central Electricity Regulatory

Commission (Grant of Connectivity, Long Term Access and Medium Term

Open Access in Inter-State Transmission and related matters) Regulations,

2009 or its statutory re-enactments as amended from time to time :

Provided that in respect of a consumer connected to a distribution

system seeking Inter-State long-term access, the SLDC, before giving its

consent to the RLDC as required under the Central Commission’s

Regulations, shall require the consumer to submit the consent of the

distribution licensee concerned.

(2) Involving only Intra-State transmission system.––Subject

to the provisions of sub-regulation (1) hereinabove, Intra-State long-term

access involving Intra-State transmission system shall be in accordance

with the provisions of clause (a) hereinbelow :––

(a) The application for grant of long-term access shall contain

details such as name of the entity or entities from whom

electricity is proposed to be procured along with the quantum

of power and such other details as may be laid down by the

State Transmission Utility in the detailed procedure :

Provided that in case augmentation of transmission system is

required, the applicant shall also have to bear the transmission

charges for the same as per 2nd proviso of sub-regulation (1)

of Regulation 21 contained in chapter 5 of these regulations :

Provided further that in cases where there is any material

change in location of the applicant or change by more than 10

per cent in the quantum of power to be inter-changed using the

Intra-State transmission system, a fresh application shall be

made, which shall be considered in accordance with these

regulations.

No. 17-2]

The J&K Govt. Gazette, 24th July, 2015/2nd Asad., 1937.

23

–––––––—–––––––––––––––––––––––––––––––––––––––––––––––———

24

The J&K Govt. Gazette, 24th July, 2015/2nd Asad., 1937.

[No. 17-2

––––––––––––––––––––––––––––––––––––––––––––––—–––—————

(b) The applicant shall submit any other information sought by the

nodal agency including the basis for assessment of power to

be inter-changed using the Intra-State transmission system and

power to be transmitted to or from various entities or regions

to enable the nodal agency to plan the Intra-State transmission

system in a holistic manner ;

(c) The application shall be accompanied by a bank guarantee of

Rs 10,000/- (ten thousand) per MW of the total power to be

transmitted. The bank guarantee shall be in favour of the

nodal agency, in the manner laid down under the detailed

procedure ;

(d) The bank guarantee of Rs. 10,000 /- (ten thousand) per MW

shall be kept valid and subsisting till the execution of the long-

term access agreement, in the case when augmentation of

transmission system is required, and till operationalisation of

long-term access when augmentation of transmission system

is not required ;

(e) The bank guarantee may be encashed by the nodal agency, if

the application is withdrawn by the applicant or the long-term

access rights are relinquished prior to the operationalisation of

such rights when augmentation of transmission system is not

required ;

(f) The aforesaid bank guarantee will stand discharged with the

submission of another bank guarantee required to be given by

the applicant to the State Transmission Utility during construction

phase when augmentation of transmission system is required,

in accordance with the provisions in the detailed procedure ;

(g) On receipt of the application, the nodal agency shall, in

consultation and through coordination with other agencies

involved in Intra-State transmission system to be used, process

the application and carry out the necessary system studies as

No. 17-2]

The J&K Govt. Gazette, 24th July, 2015/2nd Asad., 1937.

25

–––––––—–––––––––––––––––––––––––––––––––––––––––––––––———

expeditiously as possible so as to ensure that the decision to

grant long-term access is arrived at within the timeframe

specified in sub-regulation (2) of Regulation 13 above :

Provided that in case the nodal agency faces any difficulty in

the process of consultation or coordination, it may approach

the Commission for appropriate directions ;

(h) Based on the system studies, the nodal agency shall specify

the Intra-State transmission system that would be required to

give long-term access. In case augmentation to the existing

Intra-State transmission system is required, the same will be

intimated to the applicant ;

(i) While granting long-term access, the nodal agency shall

communicate to the applicant, the date from which long-term

access shall be granted and an estimate of the transmission

charges including additional transmission charges, if any, for

works pertaining to augmentation of transmission system as

per 1st proviso of sub-regulation (a) above, likely to be payable

based on the prevailing costs, prices and methodology of sharing

of transmission charges specified by the Commission subject

to approval by the Commission in accordance with 2nd proviso

of sub- regulation (1) of Regulation 21 contained in Chapter 5

of these regulations ;

(j) The applicant shall sign an agreement for long-term access

with the State Transmission Utility in case long-term access is

granted by the State Transmission Utility, in accordance with

the provision as may be provided in the detailed procedure.

While seeking long-term access to an Intra-State transmission

licensee, other than the State Transmission Utility, the applicant

shall sign a tripartite long-term access agreement with the State

Transmission Utility and the Intra-State transmission licensee.

The long-term access agreement shall contain the date of

26

The J&K Govt. Gazette, 24th July, 2015/2nd Asad., 1937.

[No. 17-2

––––––––––––––––––––––––––––––––––––––––––––––—–––—————

commencement of long-term access, the point of injection of

power into the grid and point of drawal from the grid and the

details of dedicated transmission lines, if any, required. In case

augmentation of transmission system is required, the long-term

access agreement shall contain the timeline for construction of

the facilities of the applicant and the transmission licensee, the

bank guarantee required to be given by the applicant and other

details in accordance with the detailed procedure ;

(k) Immediately after grant of long-term access, the nodal agency

shall inform the State Load Despatch Centre so that it

can consider the same while processing requests for grant of

short-term open access, received under these regulations ;

(l) On the expiry of the period of long-term access, the same shall

stand extended on a written request by the consumer, to the

Sate Transmission Utility, submitted at least six months prior to

such expiry, mentioning the period for which extension is

required :

Provided that in case no written request is received from the

customer within the timeline specified above, the said long-

term access shall stand terminated on the date up to which it

was initially granted.

(3) Within same distribution system.––The procedure specified

in sub-regulation (2) above shall, mutatis mutandis, apply to cases of

long-term access when the point of injection and the point of drawal are

located in the same distribution system.

15. Procedure for medium-term open access :

(1) Involving Inter-State transmission system.––Notwithstanding

anything contained in sub-regulation (2) and (3) hereinbelow, procedure

for Inter-State medium-term open access shall be as per Central Electricity

Regulatory Commission (Grant of Connectivity, Long-Term Access and

No. 17-2]

The J&K Govt. Gazette, 24th July, 2015/2nd Asad., 1937.

27

–––––––—–––––––––––––––––––––––––––––––––––––––––––––––———

Medium-Term Open Access in Inter-State Transmission and related matters)

Regulations, 2009 or its statutory re-enactment as amended from time to

time :

Provided that in respect of a consumer connected to a distribution

system seeking Inter-State medium-term open access, the SLDC, before

giving its consent to the RLDC as required under the Central Commission’s

regulations, shall require the consumer to submit the consent of the

distribution licensee concerned.

(2) Involving only Intra-State transmission system.––Subject

to the provisions of sub-regulation (1) hereinabove, Intra-State medium-

term open access involving Intra-State transmission system shall be in

accordance with the provisions of sub-regulation (a) to (g) hereinbelow :–

(a) The application for grant of medium-term open access shall

contain such details as may be laid down under the detailed

procedure and shall, in particular, include the point of injection

into the grid, point of drawal from the grid and the quantum

of power for which medium-term open access has been

applied for ;

(b) The start date of the medium-term open access shall not be

earlier than 5 months and not later than 1 year from the last

day of the month in which application has been made.

(c) On receipt of the application, the nodal agency shall, in

consultation and through coordination with other agencies

involved in Intra-State transmission, process the application and

carry out the necessary system studies as expeditiously as

possible so as to ensure that the decision to grant or refuse

medium-term open access is made within the timeframe

specified in sub-regulation (2) of Regulation 13 hereinabove :

Provided that in case the nodal agency faces any difficulty in

the process of consultation or coordination, it may approach

the Commission for appropriate directions.

28

The J&K Govt. Gazette, 24th July, 2015/2nd Asad., 1937.

[No. 17-2

––––––––––––––––––––––––––––––––––––––––––––––—–––—————

(d) On being satisfied that the requirements, with respect to criteria

for granting medium-term open access specified under

sub-regulation (2) of Regulation 11 are met, the nodal agency

shall grant medium-term open access for the period stated in

the application :

Provided that for reasons to be recorded in writing, the nodal

agency may grant medium-term open access for a period less

than that sought for by the applicant :

(e) The applicant shall sign an agreement for medium-term open

access with the State Transmission Utility, in accordance with

the provision as may be made in the detailed procedure. While

seeking medium-term open access to an Intra-State

transmission licensee, other than the State Transmission Utility,

the applicant shall sign a tripartite medium-term open access

agreement with the State Transmission Utility and the Intra-

State transmission licensee. The medium-term open access

agreement shall contain the date of commencement and end

of medium-term open access, the point of injection of power

into the grid and point of drawal from the grid, the details of

dedicated transmission lines required, if any, the bank guarantee

required to be given by the applicant and other details in

accordance with the detailed procedure.

(f) Immediately after grant of medium-term open access, the nodal

agency shall inform the State Load Despatch Centre so that it

can consider the same while processing requests for

short-term open access received under these regulations.

(g) On expiry of the period of the medium-term open access, the

medium-term customer shall not be entitled to any overriding

preference for renewal of the term.

(3) Within same distribution system.––The procedure specified

in sub-regulation (2) above shall, mutatis mutandis, apply to cases of

medium-term open access when the point of injection and the point of

drawal are located in the same distribution system.

No. 17-2]

The J&K Govt. Gazette, 24th July, 2015/2nd Asad., 1937.

29

–––––––—–––––––––––––––––––––––––––––––––––––––––––––––———

16. Procedure for short-term Open Access :

(1) Involving Inter-State transmission system.–– Notwithstanding

anything contained in sub-regulation (2) to (3) hereinbelow, procedure for

Inter-State short-term open access shall be as per Central Electricity

Regulatory Commission (Open Access in Inter-State Transmission)

Regulations, 2008, or its statutory re-enactments, as amended from time to

time :

Provided that in respect of a consumer connected to a distribution

system seeking Inter-State short-term open access, the SLDC, before giving

its consent to the RLDC as required under the Central Commission’s

regulations, shall require the consumer to submit the consent of the

distribution licensee concerned.

(2) Involving only Intra-State transmission system.––Subject

to the provisions of sub-regulation (1) hereinabove, Intra-State short-term

open access shall be in accordance with the provisions of clause (a) to (f)

hereinbelow :––

(a) Open access in advance :

(i)

Application may be submitted to the Nodal Agency seeking

short-term open access up to the fourth month, considering

the month in which an application is made being the first

month ;

(ii)

Separate application shall be made for each month and

for each transaction in a month ;

(iii)

The application to the Nodal agency shall be on the

prescribed form given in [FORMAT ST-1] containing

such details as capacity needed, generation planned or

power purchase contracted, point of injection, point of

drawal, duration of availing open access, peak load,

average load and such other additional information as may

30

The J&K Govt. Gazette, 24th July, 2015/2nd Asad., 1937.

[No. 17-2

––––––––––––––––––––––––––––––––––––––––––––––—–––—————

be required by the Nodal Agency. The application shall

be accompanied by a non-refundable application fee in

cash or by demand draft in favour of the officer so notified

by Nodal Agency ;

(iv)

An application for grant of open access commencing in

any month may be submitted in a cover marked

“Application for short-term open access -in advance” up

to 15th day of the preceding month.

For example, application for grant of open access

commencing in the month of July shall be received up to

15th day of June.

(v)

Nodal Agency shall acknowledge receipt of the

application by indicating time and date on

“ACKNOWLEDGEMENT” to the applicant ;

(vi)

A customer of distribution licensee intending to avail open

access shall also furnish a copy of his application to the

distribution licensee of his area of supply ;

(vii)

Based on the type of transactions Nodal Agency shall

take a decision on the applications for short-term open

access in the manner provided hereinbelow ;

(viii)

All applications received under sub-clause (iv) above shall

be taken up for consideration together and processed as

per allotment priority criteria specified under Regulation

20 of these regulations ;

(ix)

Nodal Agency shall check transaction for congestion of

any element (line and transformer) of transmission and

distribution system involved in transaction ;

(x)

Nodal Agency shall convey grant of open access or

otherwise in format [FORMAT-ST-2] along with

No. 17-2]

The J&K Govt. Gazette, 24th July, 2015/2nd Asad., 1937.

31

–––––––—–––––––––––––––––––––––––––––––––––––––––––––––———

schedule of payments to the consumer latest by 19th day

of such preceding month ;

(xi)

Nodal Agency shall assign specific reasons if open

access is denied under sub-clause (x).

(b) Day-Ahead Open Access :

(i)

An application for grant of day-ahead open access may

be received by Nodal Agency within three days prior to

the date of scheduling but not later than 1000 hours of the

day immediately preceding the day of scheduling for day-

ahead transaction ;

(ii)

For example, application for day-ahead transaction on 25th

day of July shall be received on 22nd day or 23rd day or

up to 1000 hours on 24th day of that month ;

(iii)

Nodal Agency shall check for congestion and convey

grant of approval or otherwise in the same format

[FORMAT-ST-2] as provided in sub-clause (x) of

clause (a) of sub-regulation 2 of Regulation 16. All other

provisions of application for short-term open access shall

apply.

(c) Bidding Procedure :

(i)

If the capacity sought by the customers for Open Access

in advance for the following month is more than the

available capacity or SLDC perceives congestion of any

element of transmission and distribution system involved

in the transaction, the allocation shall be made through

electronic bidding procedure ;

(ii)

The decision of SLDC in respect of an expected

congestion shall be final and binding ;

32

The J&K Govt. Gazette, 24th July, 2015/2nd Asad., 1937.

[No. 17-2

––––––––––––––––––––––––––––––––––––––––––––––—–––—————

(iii)

SLDC shall convey information of congestion and decision

for invitation of bidding indicating floor price on format

[FORMAT-ST-3] to the applicants ;

(iv)

SLDC shall also display bidding information on its

website ;

(v)

The floor price of transmission and wheeling charges

determined on the basis of relevant order of the

Commission shall be indicated in FORMAT-ST-3 ;

(vi)

The bids shall be accepted on format [FORMAT-ST-4]

up to the “bid closing time” as indicated in bidding invitation

FORMAT-ST-3. Modification/amendment to a bid, once

submitted shall not be entertained ;

(vii)

If any customer does not participate in bidding process,

his application shall be deemed to have been withdrawn

and shall not be processed ;

(viii)

SLDC shall not entertain any request for extension of

time/date for submission of bids ;

(ix)

The bidders shall quote price (rounded-off to whole

number) in denomination in which floor price has been

determined ;

(x)

The quoted price shall be arranged in descending order

and allocation of available capacities shall be accorded in

such descending order until the available capacity is

exhausted ;

(xi)

In case of equal price quoted by two or more customers,

the allocation from the residual available capacity at any

stage under sub-clause (x) above shall be made in

proportion to capacity being sought by such customers ;

No. 17-2]

The J&K Govt. Gazette, 24th July, 2015/2nd Asad., 1937.

33

–––––––—–––––––––––––––––––––––––––––––––––––––––––––––———

(xii)

All customers, in favour of whom full capacities have

been allotted, shall pay the highest price obtained from

bids ;

(xiii)

The customers, who are allotted less capacity, shall pay

the price as quoted by them ;

(xiv)

SLDC shall reject bid which are incomplete, vague in

any manner or not found in conformity with bidding

procedure ;

(xv)

The successful bidder, in favour of whom the capacities

have been allocated, shall pay transmission charges,

wheeling charges, as the case may be, determined by

bidding under sub-clause (xii) or (xiii) of this clause.

(d) The reserved capacity by a short-term open access customer

is not transferable to others ;

(e) The capacity available as a result of surrender or reduction or

cancellation of the reserved capacity by the State Load

Dispatch Centre, may be reserved for any other short-term

open access customer in accordance with these regulations ;

(f) On expiry of the period of the short-term open access, the

short-term customer shall not be entitled to any overriding

preference for renewal of the term.

(3) Within same distribution system.––The procedure specified

in sub-regulation (2) above, mutatis mutandis, shall apply to cases of short-

term open access when the point of injection and the point of drawal are

located in the same distribution system.

17. Consent by STU, SLDC or Distribution Licensee :

(1) Inter-State Open Access.–– STU in the case of application

for grant of long-term access and SLDC in the case of grant of medium-

term open access and short-term open access shall convey its consent or

otherwise as per the provisions of Central Electricity Regulatory Commission

34

The J&K Govt. Gazette, 24th July, 2015/2nd Asad., 1937.

[No. 17-2

––––––––––––––––––––––––––––––––––––––––––––––—–––—————

(Grant of Connectivity, Long-Term Access and Medium-Term Open Access

in Inter-State Transmission and related matters) Regulations, 2009 and

Central Electricity Regulatory Commission (Open Access in Inter-State

Transmission) Regulations, 2008, respectively or their statutory

re-enactments, as amended from time to time. In case of applicant connected

to the distribution licensee, the said distribution licensee shall convey its

consent or otherwise within 3 days of receipt of the request of the applicant.

(2) Intra-State Open Access :

(a) While processing the application seeking consent for intra-State

open access, the nodal agency shall verify the following,

namely :––

(i)

Existence of infrastructure necessary for time block-wise

energy metering and accounting in accordance with the

provisions of the State Grid Code in force ; and

(ii)

Availability of capacity in the transmission and/or

distribution network.

(b) Where existence of necessary infrastructure and availability

of capacity in the transmission and/or distribution network has

been established, the nodal agency shall convey its consent to

the applicant by e-mail or FAX or by any other usually recognised

mode of communication, within three (3) working days of

receipt of the application ;

(c) In case the nodal agency finds that the application for consent

is incomplete or defective in any respect, it shall communicate

the deficiency or defect to the applicant by e-mail or FAX or

by any other usually recognised mode of communication, within

two (2) working days of receipt of the application ;

(d) In case the application has been found to be in order but the

nodal agency refuses to give consent on the grounds of

No. 17-2]

The J&K Govt. Gazette, 24th July, 2015/2nd Asad., 1937.

35

–––––––—–––––––––––––––––––––––––––––––––––––––––––––––———

non-existence of necessary infrastructure or unavailability of

surplus capacity in the distribution network, such refusal shall

be communicated to the applicant by e-mail or FAX or by any

other usually recognized mode of communication, within the

period of three (3) working days from the date of receipt of

the application, along with reasons for such refusal ;

(e) Where the nodal agency has not communicated any deficiency

or defect in the application within two (2) days from the date

of receipt of application, or refusal or consent within the

specified period of three (3) working days from the date of

receipt of the application consent shall be deemed to have been

granted.

(3) Within same distribution system.–– The procedure specified

in sub-regulation (2) above, mutatis mutandis, shall apply to applicant

seeking consent for Intra-State open access when the point of injection and

the point of drawal are located in the same distribution system.

18. Consideration of applications from defaulters.––

Notwithstanding anything contained in these regulations, the Nodal Agency

shall be at liberty to summarily reject an application for open access on the

ground of non-compliance of the provisions of these regulations, more

specifically the provisions relating to timely payment of the charges leviable

hereunder.

19. Application by eligible entities other than consumers and

generating stations connected to distribution system.––The procedure

for submission of the application and processing the same as laid down in

this Chapter in respect of the consumers shall, mutatis mutandis, be

applicable to the electricity trading licensees, distribution licensees and the

generating companies connected to the STU as well. The procedure for

submission and processing of open access application by a generating

company in respect of a generating station connected to distribution system

has been specified in Chapter 11 of these Regulations.

36

The J&K Govt. Gazette, 24th July, 2015/2nd Asad., 1937.

[No. 17-2

––––––––––––––––––––––––––––––––––––––––––––––—–––—————

20. Allotment Priority.––(1) The priority for allotment of open

access in Intra-State transmission system shall be decided on the following

criteria :

(a) A distribution licensee shall have the highest priority in allotment

of open access capacity irrespective of whether the open

access request is for long-term, medium-term or short-term ;

(b) The long-term open access applicants shall have the priority

next to the distribution licensee ;

(c) The medium-term open access applicants shall have the priority

next to the long- term open access applicants ;

(d) The short-term open access applicants shall have the priority

next to the medium-term open access applicants ;

(e) Allotment priority for short-term open access applicants shall

be decided subject to capacity availability ;

(f) An existing open access customer shall have the priority higher

than new open access applicants under respective category

provided the former applies for its renewal thirty days prior to

the expiry of existing term of open access ;

(g) When the requirement projected by an applicant is more than

the available capacity and the said applicant is not able to limit

his requirement to the available capacity, the request of

applicant having next lower priority shall be taken up for

consideration.

CHAPTER 5

Open Access Charges

21. Transmission Charges and Wheeling Charges :

(1) Transmission Charges.––Open Access customer using

transmission system shall pay the charges as stated hereunder :––

(a) For use of Inter-State transmission system-As specified by

the Central Commission from time to time ;

No. 17-2]

The J&K Govt. Gazette, 24th July, 2015/2nd Asad., 1937.

37

–––––––—–––––––––––––––––––––––––––––––––––––––––––––––———

(b) For use of Intra-State transmission system-Transmission

charges payable to State Transmission Utility/transmission

licensee by an open access customer for usage of their system

shall be determined as under :––

Transmission Charges = ATC/(PLST X365) (in Rs./MW-day)

Where,

ATC =Annual Transmission Charges determined by the

Commission for the State transmission system for the previous

year.

PLST = Peak Load Served by the State Transmission system

in that year :

Provided that transmission charges shall be payable on the basis

of contracted Capacity/Scheduled Load or actual power flow

whichever is higher. For open access for a part of a day, the

transmission charges shall be payable on pro-rata basis :

Provided further that where augmentation of transmission

system including dedicated transmission system used for open

access has been constructed for exclusive use of or being used

exclusively by an open access customer, the transmission

charges for such dedicated system shall be worked out by

transmission licensee for their respective systems and got

approved by the Commission and shall be borne entirely by

such open access customer till such time the surplus capacity

is allotted and used for by other persons or purposes.

(2) Wheeling Charges.––Wheeling charges payable to distribution

licensee, by an open access customer for usage of its system shall be as

determined as under :––

Wheeling Charges = (ARR - PPC - TC) /(PLSD X365) (in

Rs./MW-Day)

38

The J&K Govt. Gazette, 24th July, 2015/2nd Asad., 1937.

[No. 17-2

––––––––––––––––––––––––––––––––––––––––––––––—–––—————

Where,

ARR = Annual Revenue Requirement of the distribution

licensee in the previous year

PPC = Total Power Purchase Cost of distribution licensee in

the previous year

TC = Total transmission Charges paid by distribution licensee

for State and Inter-State transmission system for the previous

year

PLSD = Total Peak Load Served by the concerned Distribution

system in the previous year :

Provided that wheeling charges shall be payable on the basis

of contracted Capacity/Scheduled Load or actual power flow

whichever is higher. For open access for a part of a day, the

wheeling charges shall be payable on pro-rata basis :

Provided further that where a dedicated distribution system

used for open access has been constructed for exclusive use

of an open access customer, the wheeling charges for such

dedicated system shall be worked out by distribution licensee

for their respective systems and got approved by the

Commission and shall be borne entirely by such open access

customer till such time the surplus capacity is allotted and used

for by other persons or purposes.

22. Scheduling and system operation charges.––Scheduling and

system operation charges shall be payable by the open access customers

at the following rates :––

(1) In respect of Inter-State open access :

(a) Long-term access and medium-term open access––

(i) Regional Load Despatch Centre fees and charges

No. 17-2]

The J&K Govt. Gazette, 24th July, 2015/2nd Asad., 1937.

39

–––––––—–––––––––––––––––––––––––––––––––––––––––––––––———

including charges for the Unified Load Despatch and

Communication Scheme as specified by the Central

Commission under section 28(4) of the Indian

Electricity Act, 2003 ;

(ii) State Load Despatch Centre charges as specified by

the Commission under sub-section (3) of section 27 of

the Act.

(b) Short-term open access––

(i) Regional Load Despatch Centre and State Load

Dispatch Centre charges as specified by the Central

Commission.

(2) In respect of Intra-State open access :

(a) Long-term access and medium-term open access––

(i) Long-term access and medium-term open access

customers shall be liable to pay SLDC charges

determined by the Commission under sub-section (3)

of section 27 of the Act.

(b) Short-term open access––

(i) A composite operating charge @ Rs. 2,000/- per day

or part of the day shall be payable by a short-term

open access customer for each transaction to the

SLDC or as determined by the Commission from time

to time.

Explanation :––The operating charge includes fee for

scheduling and system operation,

energy accounting, fee for affecting

revisions in schedule on bona fide

grounds and collection and

disbursement of charges.

40

The J&K Govt. Gazette, 24th July, 2015/2nd Asad., 1937.

[No. 17-2

––––––––––––––––––––––––––––––––––––––––––––––—–––—————

23. Cross subsidy surcharge.––(1) If open access facility is availed

of by a subsidising consumer of a distribution licensee of the State, then

such customer, in addition to transmission and/or wheeling charges, shall

pay cross subsidy surcharge determined by the Commission. Cross subsidy

surcharge determined on per unit basis shall be payable, on a monthly basis,

by the open access customers based on the actual energy drawn during the

month through open access. The amount of surcharge shall be paid to the

distribution licensee of the area of supply from whom the consumer was

availing supply before seeking open access :

Provided that the Commission may fix a lower surcharge in the situation

of shortages and load shedding by the distribution licensee :

Provided further that in case power supply position or the consumer

load seeking open access changes substantially, the Commission may review

the cross subsidy surcharge as and when required.

(2) The cross subsidy surcharge shall be determined in accordance

with the following formula specified in National Tariff Policy :––

Surcharge formula :

S = T - {C(1+L/100) + D}

Where,

S is the cross Subsidy surcharge.

T is the Tariff payable by the relevant category of

consumers.

C is the weighted average cost of power purchase of top 5%

at the margin excluding liquid fuel based generation and

renewable power.

D is the wheeling charges per kWh basis (to be derived from

the wheeling charges in Rs./MW-day referred to in

Regulation 21(2).

No. 17-2]

The J&K Govt. Gazette, 24th July, 2015/2nd Asad., 1937.

41

–––––––—–––––––––––––––––––––––––––––––––––––––––––––––———

L is the system losses for the applicable voltage level expressed

as a percentage :

Provided that in case the above formula gives negative value

of surcharge, the same shall be zero.

24. Additional Surcharge.––(1) An open access consumer,

receiving supply of electricity from a person other than the distribution

licensee of his area of supply, shall pay to the distribution licensee an additional

surcharge on the charges of wheeling, in addition to wheeling charges and

cross subsidy surcharge, to meet out the fixed cost of such distribution

licensee arising out of his obligation to supply as provided under sub-section

(4) of section 36 of the Act.

(2) This additional surcharge shall become applicable only if the

obligation of the licensee in terms of power purchase commitments has

been and continues to be stranded or there is an unavoidable obligation and

incidence to bear fixed costs consequent to such a contract. However, the

fixed costs related to network assets would be recovered through wheeling

charges.

(3) The distribution licensee shall submit to the Commission, on six

monthly basis, a detailed calculation statement of fixed cost which the

licensee is incurring towards his obligation to supply.

The Commission shall scrutinize the statement of calculation of fixed

cost submitted by the distribution licensee and obtain objections, if any, and

determine the amount of additional surcharge :

Provided that any additional surcharge so determined by the

Commission shall be applicable only to the new open access consumers.

(4) Additional surcharge determined on per unit basis shall be payable,

on monthly basis, by the open access customers based on the actual energy

drawn during the month through open access :

Provided that such additional surcharges shall not be levied in case

distribution access is provided to a person who has established a captive

42

The J&K Govt. Gazette, 24th July, 2015/2nd Asad., 1937.

[No. 17-2

––––––––––––––––––––––––––––––––––––––––––––––—–––—————

generation plant for carrying the electricity to the destination of his

own use.

25. Stand-by charges for drawal of power by open access

consumer from distribution licensee.––(1) In cases of outages of generator

supplying to open access consumer under open access or generator

connected to distribution system injecting power through open access

requires start up power, stand-by arrangements shall be provided by the

distribution licensee subject to the load shedding as applicable to consumer

of the licensee and the licensee shall be entitled to collect tariff as applicable

to temporary category of consumer in the prevailing rate schedule :

Provided further that in case of stand-by arrangements sought by

continuous process industries, the licensee shall charge on the basis of

actual costs involved in arranging power :

Provided also that open access customers would have the option to

arrange stand-by power from any other source :

Provided further that there shall be no stand-by charges for embedded

consumers.

CHAPTER 6

Scheduling, Metering, Revision and Losses

26. Scheduling.––(1) Notwithstanding anything contained in the

succeeding sub-regulation of this regulation, scheduling of Inter-State open

access transactions shall be as specified by the Central Commission.

(2) Subject to the foregoing clause, Intra-State open access

transactions in respect of all consumers and generating stations irrespective

of the capacity shall be scheduled by SLDC in accordance with the

provisions of the State Grid Code.

No. 17-2]

The J&K Govt. Gazette, 24th July, 2015/2nd Asad., 1937.

43

–––––––—–––––––––––––––––––––––––––––––––––––––––––––––———

27. Metering.––(1) All open access consumers (except embedded

consumers) and all generating stations irrespective of capacity shall be

provided with, Special Energy Meters by the State Transmission Utility or

the distribution licensee as the case may be, for and at the cost of the open

access customers. For embedded consumers existing ToD meters would

be adequate.

(2) Special Energy Meters installed shall be capable of time-

differentiated measurements for time block-wise active energy and voltage

differentiated measurement of reactive energy in accordance with the State

Grid Code.

(3) Special Energy Meters shall always be maintained in good

condition.

(4) Special Energy Meters shall be open for inspection by any person

authorized by the State Transmission Utility or the State Load Despatch

Centre.

(5) All the open access customers shall abide by the metering

standards of CEA.

28. Revision.––Revision of scheduled energy shall be permitted in

accordance with the provisions of IEGC or the State Grid Code as the case

may be.

29. Losses :

(1) Transmission losses.––System transmission losses shall be

payable in kind by all open access customers :––

(a) Inter-State transmission––

(i) Long-term access and medium-term open access :

The buyers shall bear apportioned energy losses in the

transmission system in accordance with the provisions

specified by the Central Commission.

44

The J&K Govt. Gazette, 24th July, 2015/2nd Asad., 1937.

[No. 17-2

––––––––––––––––––––––––––––––––––––––––––––––—–––—————

(ii) Short-term Open Access––

The buyers and sellers shall absorb apportioned energy

losses in the transmission system in accordance with

the provisions specified by the Central Commission.

(b) Intra-State transmission––

(i) The transmission losses for the Intra-State system

determined by the Commission in tariff orders for the

applicable year, shall be apportioned in proportion to

the actual energy drawal by the open access customers

and shall be payable in kind.

(2) Distribution loss.––System distribution losses shall be payable

by all open access consumers and Captive Power Plants supplying power

to its units within the State as determined by the Commission for various

voltage levels in tariff orders for the applicable year. Distribution system

losses shall also be payable in kind by Generators and Traders who are

connected through distribution system of licensee.

Example :

(A) Embedded generator connected to 33kV distribution

system of the licensee supplying to consumer outside

State :

(i) Power injected at interconnecting point

- 8.00 MW.

(ii) Distribution system losses @ 15%

- 1.20 MW

(iii) Power injected at transmission level

- 6.80 MW

(iv) State transmission system

- 0.13 MW

losses @1.86%

(v) Net scheduled at state periphery

- 6.67 MW

(for SLDC)

No. 17-2]

The J&K Govt. Gazette, 24th July, 2015/2nd Asad., 1937.

45

–––––––—–––––––––––––––––––––––––––––––––––––––––––––––———

(vi) NR transmission losses @ 4%

- 0.27 MW

(vii) Net available to beneficiary

- 6.40 MW

Note :––In addition to above, transmission losses of other regions shall

also be applicable if power is being transmitted outside NR region.

(B) Consumer of distribution licensee availing power from

outside State under open access (say from power

exchange) :

(i) Power drawn by the consumer at

- 8 MW

his premises (say A)

(ii) Distribution loss @ 15% (say B)

(iii) Power required at distribution

- 9.4 MW

periphery (C=A/(1-B))

(iv) Transmission loss @ 1.86% (say D)

(v) Schedule at state periphery

- 9.6 MW

(E=C/(1-D))

(vi) Central transmission losses @ 4% (say F)

(vii) Power to be tied up from exchange

- 10 MW

(G=E/(1-F))

Note :––In addition to above, transmission losses of other regions shall

also be applicable if power is being drawn from outside NR region.

Note :––High Voltage rebate provided in relevant tariff order shall be suitably

incorporated while fixing distribution loss for open access

consumers. The same has been illustrated in the example given

below :––

Example :

(i) High Voltage Rebate for 132 kV (%) = A

(ii) Average recovery rate from HT Industry category =

Rs. X/kWh

46

The J&K Govt. Gazette, 24th July, 2015/2nd Asad., 1937.

[No. 17-2

––––––––––––––––––––––––––––––––––––––––––––––—–––—————

(iii) Average Power Purchase Rate = Rs. Y/kWh

(iv) Equivalent loss compensation for rebate (%) = X/Y times

of A

(v) Average loss chargeable to relevant category (%) = B

(vi) Loss chargeable to consumer getting HV rebate (%) =

B-X/Y of A.

CHAPTER 7

Imbalance and Reactive Energy Charges

30. Imbalance Charge.––(1) Scheduling of all transactions pursuant

to grant of long-term access or medium-term open access or short-term

open access shall be carried out on day-ahead basis in accordance with the

relevant provisions of IEGC for Inter-State transactions and in accordance

with JKSERC (Grid Code) for Intra-State transactions.

(2) In case of deviation by open access consumers with load of less

than 10 MW, the difference between the applicable sanctioned open access

load and the actual drawal shall be accounted through the Time of Day

(ToD) Meters on monthly basis and settled at the rate of the imbalance

charge as determined by the Commission (where imbalance charge has

not been determined by the Commission, UI rate as determined by the

Central Commission shall be applicable). In case of under drawal as a

result of non-availability of the distribution system or unscheduled load

shedding, the open access consumer shall be compensated by the distribution

licensee at the average power purchase cost of the distribution licensee or

the contract price of energy for the open access consumer, whichever is

lower.

(3) Deviations between the schedule and the actual injection/drawal

in respect of open access consumers with load of 10 MW and above and

the generating stations irrespective of the capacity, shall be settled based

on the composite accounts for imbalance transactions issued by SLDC on

a weekly cycle based on net metering in accordance with the rates specified

No. 17-2]

The J&K Govt. Gazette, 24th July, 2015/2nd Asad., 1937.

47

–––––––—–––––––––––––––––––––––––––––––––––––––––––––––———

by the Commission. Where the imbalance charges are not specified by the

Commission, the imbalance charges specified by the Central Commission

shall be applicable.

(4) Payment of imbalance charges shall have a high priority and the

concerned constituents (including the licensees or the open customers as

the case may be) shall pay the indicated amounts within 10 (ten) days of

the issue of the statement, into a State imbalance pool account operated by

the SLDC. The person who has to receive the money on account of imbalance

charges would then be paid out from the State imbalance pool account,

within three (3) working days.

(5) If payments against the above imbalance charges are delayed by

more than two days, i. e., beyond twelve (12) days from the date of issue of

statement, the defaulting party shall have to pay simple interest @ 0.04%

for each day of delay. The interest so collected shall be paid to the person

who had to receive the amount, payment of which got delayed. Persistent

payment defaults, if any, shall be reported by the SLDC to the Commission,

for initiating remedial action.

31. Reactive Energy Charge.––In respect of open access customer

the payment for the reactive energy charges shall be in accordance with

provisions stipulated in the IEGC till such provision is stipulated in State

Grid Code.

CHAPTER 8

Commercial Matters

32. Billing, Collection and Disbursement.––Billing in respect of

the charges payable under these regulations shall be made as per the

following procedure :

(1) Inter-State transactions.––

(a) Short-Term Open Access :

(i) Collection and disbursement of transmission charges

for use of CTU and STU systems and operating

48

The J&K Govt. Gazette, 24th July, 2015/2nd Asad., 1937.

[No. 17-2

––––––––––––––––––––––––––––––––––––––––––––––—–––—————

charges payable to RLDCs and SLDCs towards short-

term open access shall be made by the nodal RLDC

in accordance with the procedure specified by the

Central Commission ;

(ii) The short-term open access customer connected to

distribution system of a distribution licensee shall pay

to such distribution licensee, the wheeling charges

payable to the distribution licensee within 3 days from

the grant of the short-term open access by the nodal

agency.

(b) Long-term access and medium-term open access :

(i) Billing, collection and disbursement of charges payable

to RLDC including Unified Load Despatch and

Communication Scheme shall be in accordance with

the procedure specified by the Central Commission ;

(ii) Bills towards the charges payable to SLDC shall be

raised by the STU/SLDC directly to the open access

customer connected to STU and to the distribution

licensee in respect of the customers connected to the

distribution system, before the 3rd working day of the

succeeding calendar month ;

(iii) Distribution licensee shall raise the bill with the open

access customer connected to it within 3 days of receipt

of bill from SLDC ;

(iv) Open access customer connected to the distribution

licensee shall pay the charges within five days of

receipt of bill from distribution licensee. The distribution

licensee shall disburse the amount payable to STU/

SLDC on a monthly basis ;

(v) Open access customer connected to the STU shall

pay the bills within five working days of receipt of the

bill.

No. 17-2]

The J&K Govt. Gazette, 24th July, 2015/2nd Asad., 1937.

49

–––––––—–––––––––––––––––––––––––––––––––––––––––––––––———

(2) Intra-State transactions––

(a) Short-Term Open Access :

(i) The short-term open access customer shall deposit with

SLDC the transmission charges and operating charges

within 3 working days of grant of the short- term open

access by SLDC ;

(ii) In addition to the above, the short-term open access

customer connected to distribution system of a

distribution licensee shall also pay to SLDC, the

wheeling charges payable to the distribution licensee

within 3 days from the grant of the short-term open

access by the nodal agency. Such charges would be

disbursed to the distribution licensee on a weekly basis.

(b) Long-Term and Medium-Term open access :

(i) SLDC, transmission licensees and distribution licensee,

where applicable, shall communicate to STU the details

of the bills due to them by the 3rd day of the

succeeding calendar month. STU shall separately

indicate the above charges and raise the bill with the

open access customer, together with the charges

receivable by it, if any, before the 5th day of the above

month. The open access customer shall pay the

charges within 7 days from the date of receipt of the

bill. STU shall disburse the charges payable to SLDC,

transmission licensee and distribution licensee on a

monthly basis.

33. Late payment surcharge.––In case the payment of any bill for

charges payable under these regulations is delayed by an open access

customer beyond the due date, without prejudice to any action under the

Act or any other regulation thereunder, a late payment surcharge at the

rate of 1.5% per month shall be levied.

50

The J&K Govt. Gazette, 24th July, 2015/2nd Asad., 1937.

[No. 17-2

––––––––––––––––––––––––––––––––––––––––––––––—–––—————

34. Default in payment.––Non-payment of any charge or sum of

money payable by the open access customer under these regulations shall

be considered non-compliance of these regulations. The STU or any other

transmission licensee or a distribution licensee may discontinue open access

after giving customer an advance notice of fifteen days without prejudice

to its right to recover such charges by suit. In case of default in payment of

charges due to the Load Despatch Centre, the Load Despatch Centre

concerned may refuse to schedule power to the defaulting open access

customer and direct the licensee concerned to disconnect such customer

from the grid.

35. Payment Security Mechanism.––In case of long-term access

and medium-term open access, the applicant for open access will open an

irrevocable Letter of Credit in favour of the agency responsible for collection

of various charges for the estimated amount of various charges for a period

of two months.

CHAPTER 9

Limited Short-Term Open Access

36. Eligibility for limited short-term open access consumer and

conditions to be satisfied.––(1) Subject to the provisions of these

regulations, any consumer of the distribution licensee having contracted

load of 1 (one) MW or above and connected to the distribution system of

licensee at 33 kV or above, seeking open access and are connected through

an independent feeder emanating from a grid sub-station of licensee or

industrial feeder provided that all the consumers on such industrial feeder,

may apply for limited short-term open access and having simultaneous

schedule of drawal under such open access.

(2) Subject to the provisions of these regulations, in case of any

limited short-term open access consumer, the minimum schedule for drawl

of power through open access in each time slot during the day shall not be

less than maximum demand recorded during previous month or 80% of its

contracted load whichever is higher.

No. 17-2]

The J&K Govt. Gazette, 24th July, 2015/2nd Asad., 1937.

51

–––––––—–––––––––––––––––––––––––––––––––––––––––––––––———

Explanation :––For the purpose of this clause, “time slot” means each 30

minutes time block which is the minimum period for which

the Time-of-day meter is capable of integrating the

maximum demand.

37. Settlement of Energy at drawal point in respect of limited

short-term open access consumer.––(1) The monthly energy drawal (in

kVAh) during the open access period by such consumer shall be calculated

from his scheduled drawal and by multiplying it with number of hours of

open access availed during the month, as provided in the open access

schedule of the consumer :

Provided that such energy drawal shall be at unity power factor.

(2) Such energy drawal through open access shall be deducted from

the monthly consumption of energy recorded in his existing meter installed

by the distribution licensee for billing purposes.

Example :

(a) Contracted load of the such consumer = 10,000 kVA

(b) Scheduled drawal = 8000 kW

(c) No. of hours during “Normal Hours i. e. C1 period” during

which open access was availed by the consumer during the

month=120 hours

(d) No. of hours during “Peak Hours i. e. C2 period” during which

open access was availed by the consumer during the

month=180 hours

(e) No. of hours during “Off Peak Hours i. e. C3 period” during

which open access was availed by the consumer during the

month=60 hours

(f) Assessed consumption during “C1 period” for the month during

open access period = 8000x120 = 960000 kWh = 960000

kVAh (at unity pf)

52

The J&K Govt. Gazette, 24th July, 2015/2nd Asad., 1937.

[No. 17-2

––––––––––––––––––––––––––––––––––––––––––––––—–––—————

(g) Assessed consumption during “C2 period” for the month during

open access period = 8000x180 = 1440000 kWh = 1440000

kVAh (at unity pf)

(h) Assessed consumption during “C3 period” for the month during

open access period = 8000x60 = 480000 kWh = 480000 kVAh

(at unity pf)

(i) Consumption recorded in consumer’s meter during “C1 period”

for the month, say 1200000 kVAh

(j) Consumption recorded in consumer’s meter during “C2 period”

for the month, say 2000000 kVAh

(k) Consumption recorded in consumer’s meter during “C3 period”

for the month, say 800000 kVAh

(l) Net consumption during “C1 period” for the month to be

accounted by distribution licensee for billing purpose = 1200000-

960000= 240000 kVAh

(m) Net consumption during “C2 period” for the month to be

accounted by distribution licensee for billing purpose = 2000000-

1440000= 560000 kVAh

(n) Net consumption during “C3 period” for the month to be

accounted by distribution licensee for billing purpose =

800000-480000= 320000 kVAh

(3) Scheduling shall be done in accordance with relevant provisions

of IEGC for Inter-State transactions and in accordance with relevant

provisions of State Grid Code for Intra-State transactions.

38. Over-drawal/under-drawal at drawal point by limited short-

term open access consumer.––Imbalance charges as per Chapter 7 of

these regulations and unscheduled Inter-change (UI) charges as specified

by the Central Commission shall not be applicable for limited short-term

No. 17-2]

The J&K Govt. Gazette, 24th July, 2015/2nd Asad., 1937.

53

–––––––—–––––––––––––––––––––––––––––––––––––––––––––––———

open access consumer. However, limited short-term open access consumer

shall be liable to pay penalty for drawing excess demand in the manner

provided below :––

(1) Over-drawal––In case such open access consumer draws power

more than 100% of its contracted load or scheduled power, whichever is

more for any time slot during the open access period in a day, it shall be

liable for payment of penalty. Rate of penalty for each time slot (Rs./kVA

of contracted load) shall be proportionate to the percentage of excess drawal

as above and shall be equal to Rs. 0.10 for each per cent.

Example :

Calculation of penalty for one day

Contracted

Excess

Rate of penalty

No. of

Penalty for

Total Penalty

load

drawal

(Rs./kVA/

time slot

each time

payable by

(CD in

(%)

time slot)

where

slot (Rs.)

consumer

kVA)

power

(Rs.)

drawn is

more

than 100%

of the

CD (TS)

–––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––

(0.10 X % excess

(TS X Rate

drawal)

X CD)

–––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––

10000

11

1.1

1

11100

15

1.5

3

45000

156100

20

2.0

5

100000

(2) Under drawal–– In case where limited short-term open access

consumer under-draws from the grid, he shall be compensated at average

rate for power purchase cost by distribution licensee as per applicable tariff

order for relevant year or contracted price of energy purchase by open

access consumer, whichever is lower.

Average rate of power purchase cost = [Total power purchase cost/

total units purchased].

54

The J&K Govt. Gazette, 24th July, 2015/2nd Asad., 1937.

[No. 17-2

––––––––––––––––––––––––––––––––––––––––––––––—–––—————

39. Charges applicable to limited short-term open access

consumers.––(1) Limited short-term open access consumers shall be

exempted from payment of transmission charges, wheeling charges, cross

subsidy surcharge and additional surcharge. However, they shall continue

to pay other charges namely energy charge, demand/fixed charge, minimum

consumption guarantee etc., applicable to them as per the rate schedule in

the tariff order :

Provided that energy charges shall be payable at balance energy/

consumption calculated as per energy settlement mechanism provided in

Regulations 37 and 38 above.

(2) Limited short-term open access consumers shall also be liable to

pay composite operating charges @ Rs. 2,000/- per day or part of the day

for each transaction to the SLDC or as determined by the Commission

from time to time.

(3) In case Inter-State transmission system is used by such consumer

in addition Intra-State transmission system or distribution system,

transmission charges, RLDC charges etc., as fixed and approved by the

Central Commission shall be payable for use of Inter-State transmission

system in addition to payment of charges as per sub-regulations (1) and (2)

above.

40. Drawal of power by limited short-term access consumer from

distribution licensee.––In cases where supplier fails to supply power, in

any time slot, to limited short-term open access consumer due to any

reason, said supplier shall revise his schedule as per provisions of State

Grid Code and the same shall be communicated to SLDC and concerned

open access customer. The SLDC shall revise the schedule which shall

become effective from 2nd time slot (counting the time slot in which such

eventuality has taken place to be the first one) and the revised schedule

shall be provided to distribution licensee. It shall be the duty of such open

access consumers to draw power as per revised schedule. Drawal of power

in excess of the revised schedule by limited short-term open access

consumers shall be treated as over-drawal of power by such consumer and

shall be liable to pay penalty as per sub-regulation (1) of Regulation 38 of

these regulations.

No. 17-2]

The J&K Govt. Gazette, 24th July, 2015/2nd Asad., 1937.

55

–––––––—–––––––––––––––––––––––––––––––––––––––––––––––———

41. Nodal Agency for limited short-term open access

customer.––The Nodal Agency for limited short-term open access

consumer shall be the State Load Despatch Center and in such case, the

State Transmission Utility and/or a transmission licensee and/or a distribution

licensee concerned, as the case may be, shall be responsible for coordination

with the State Load Despatch Center and provide all relevant information

required to take decision for providing open access.

42. Procedure for grant of limited short-term open access

customer.–– The procedure for grant of short-term open access specified

in Regulation 16 contained in Chapter 4 shall be applicable for grant of

Limited short-term open access also.

43. Metering for limited short-term open access customer.––In

case of limited short-term open access consumers, the existing ToD meter

installed at their premises shall serve the purpose for energy accounting

and billing.

44. Billing and payment for limited short-term open access

consumers.––(1) Limited short-term open access consumers, being a

consumer of distribution licensee, shall continue to pay electricity charges

billed to him on monthly basis by the distribution licensee subject to

adjustments of quantum of energy and other charges for drawal of power

during the period of open access provided in Regulation 39 above.

(2) Distribution licensee shall show these adjustments of quantum of

energy and other charges, applicable to such consumer, separately in his

electricity bill.

CHAPTER 10

Embedded Open Access Consumers

45. Eligibility for open access to embedded consumers and

conditions to be satisfied.––Subject to the provisions of these regulations,

any consumer of the distribution licensee having contracted load of 1 (one)

MW or above and connected to the distribution system of the licensee at 33

kV or above, seeking open access and are connected through an independent

56

The J&K Govt. Gazette, 24th July, 2015/2nd Asad., 1937.

[No. 17-2

––––––––––––––––––––––––––––––––––––––––––––––—–––—————

feeder emanating from a grid sub-station of licensee or industrial feeder

provided that all the consumers on such industrial feeder, may apply for

open access and having simultaneous schedule of drawal under such open

access :

Provided that the consumers who are not on independent feeders,

shall be allowed open access subject to the condition that they agree to

rostering restrictions imposed by utility on the feeders serving them :

Provided further that duties of distribution licensee, with respect to

such open access consumers, shall be of a common carrier providing

non-discriminatory open access as per section 36(3) of the Act.

46. Settlement of Energy at drawal point in respect of embedded

consumers.––The mechanism for settlement of energy at drawal point in

respect of embedded customers shall be same as that provided for limited

short-term open access customers in Regulation 37 contained in Chapter 9

of these regulations.

47. Charges applicable to embedded consumers.––(1) Embedded

open access consumers shall pay transmission charges as determined by

the Commission in accordance with the methodology specified in

sub-regulation (1) of Regulation 21 contained in Chapter 5 of these

regulations.

(2) Embedded open access consumers shall pay wheeling charges

as determined by the Commission in the following manner :––

WC Embedded consumer = WC - [FC*12*1000/365] (in Rs./MW-

day)

Where,

WC Embedded consumer = Net wheeling charges for embedded

consumers

WC = Wheeling charges as determined by the Commission in

accordance with the methodology specified in Regulation 21(2)

contained in Chapter 5 of these regulations.

No. 17-2]

The J&K Govt. Gazette, 24th July, 2015/2nd Asad., 1937.

57

–––––––—–––––––––––––––––––––––––––––––––––––––––––––––———

FC = Fixed/demand charges in Rs./kVA/month or Rs./kW/month as

per applicable rate schedule of the prevailing tariff order.

Note :––In case Wheeling Charges for embedded consumer worked

out as above becomes negative, such charge shall be zero.

(3) Embedded open access consumers shall pay cross subsidy

surcharge and additional surcharge as determined by the Commission in

accordance with the methodology specified in Regulations 23 & 24 contained

in Chapter 5 respectively.

(4) Embedded open access consumers shall also be liable to pay

composite operating charges @ Rs. 2,000/- per day or part of the day for

each transaction to the SLDC or as determined by the Commission from

time to time.

(5) Besides the above charges in respect of open access, the

embedded consumers shall continue to pay other charges namely energy

charge, demand/fixed charge, minimum consumption guarantee etc.,

applicable to them as per the rate schedule in the tariff order :

Provided that energy charges shall be payable at balance energy/

consumption calculated as per energy settlement mechanism provided in

Regulations 46 above.

(6) In case Inter-State transmission system is used by such customer

in addition Intra-State transmission system or distribution system,

transmission charges, RLDC charges etc., as fixed and approved by the

Central Commission shall be payable for use of Inter-State transmission

system in addition to payment of charges as per clauses (1) to (5) above.

48. Scheduling for embedded open access consumers.––

(1) Scheduling shall be done in accordance with relevant provisions of

IEGC for Inter-State transactions and in accordance with relevant provisions

of State Grid Code for Intra-State transactions.

(2) By 10:00 A. M. every day, these embedded consumers shall

prepare and submit daily schedule of power, in MW, separately showing

58

The J&K Govt. Gazette, 24th July, 2015/2nd Asad., 1937.

[No. 17-2

––––––––––––––––––––––––––––––––––––––––––––––—–––—————

schedule of power from licensee and that from another supplier through

open access for the next day, i. e. from 0000 hrs. to 2400 hrs. of the day

following to SLDC along with copy to distribution licensee.

(3) Embedded open access consumers shall be liable to pay excess

demand charges applicable to them as per the rate schedule in the tariff

order.

Example :––Excess demand charges, applicable to category of

consumer, shall be payable if the maximum demand recorded in any month

exceeds the contracted load/demand. Such excess load/demand over and

above the contracted load/demand shall be levied for excess load/demand

penalty :––

(a) Contracted load/demand of the consumer seeking open access

under embedded open access mechanism = 10MW

(b) Scheduled drawal from distribution licensee = 7MW

(c) Scheduled drawal through open access = 3MW

(d) Maximum demand recorded in any month =12MW

(e) Excess load/demand liable for excess load/demand penalty

for the month = 2MW

49. Procedure for grant of short-term open access to embedded

consumers.––Application and procedure for grant of open access to

embedded consumers shall be as same as applicable to short-term open

access customers specified in Regulation 16 contained in Chapter 4 of

these regulations. Nodal Agency for these consumers shall be SLDC.

50. Metering for embedded open access consumer.––In case of

embedded open access consumers, the existing ToD meter installed at their

premises shall serve the purpose for energy accounting and billing.

51. Billing and Payment for embedded open access

consumer.––(1) Billing, collection, disbursement and other commercial

No. 17-2]

The J&K Govt. Gazette, 24th July, 2015/2nd Asad., 1937.

59

–––––––—–––––––––––––––––––––––––––––––––––––––––––––––———

matters shall be same as applicable to short-term open access customers

specified in Chapter 8 of these Regulations.

(2) Embedded open access consumers, being a consumer of

distribution licensee, shall continue to pay electricity charges billed to him

on monthly basis by the distribution licensee subject to adjustments of

quantum of energy and other charges for drawal of power during the period

of open access provided in Regulation 46 above.

(3) Distribution licensee shall show these adjustments of quantum of

energy and other charges, applicable to such consumer, separately in his

electricity bill.

CHAPTER 11

Open Access to Generating Station Connected to Distribution

System

52. Application procedure for generating stations connected to

distribution system seeking open access.––Subject to the provisions of

the Section 11 of the Act, a generating station connected to a distribution

system seeking open access shall have to follow, except in respect of the

case covered under Regulation 53 hereinbelow, the same procedure as

applicable for a consumer seeking open access under different scenarios,

namely long-term access, medium-term open access and short-term open

access. Such generating station shall also be liable to pay the same

application fee, and other open access charges except the cross subsidy

surcharge and additional surcharge as are applicable to a consumer seeking

open access.

53. Application procedure for generating station seeking open

access within the area of the same distribution licensee.–– (1) A

generating station seeking open access, only within the area of the same

distribution licensee, shall make an application in the prescribed format to

the distribution licensee.

60

The J&K Govt. Gazette, 24th July, 2015/2nd Asad., 1937.

[No. 17-2

––––––––––––––––––––––––––––––––––––––––––––––—–––—————

(2) The distribution licensee, while processing the application of such

a generating station, shall follow the following procedure :––

(a) While processing the application from a generating station

seeking open access, within the area of the same distribution

licensee, the distribution licensee shall verify the following,

namely :––

(i) Existence of infrastructure necessary for time

block-wise energy metering and accounting in accordance

with the provisions of the State Grid Code in force ; and

(ii) Availability of surplus capacity in the distribution network.

(b) Where existence of necessary infrastructure and availability

of surplus capacity in the distribution network has been

established, the distribution licensee shall convey its approval

within the timelines indicated in sub-regulation (2) of Regulation

13 of these regulations as applicable to open access

consumer ;

(c) In case the distribution licensee finds that the application is

incomplete or defective in any respect, it shall communicate

the deficiency or defect to the applicant by e-mail or FAX or

by any other usually recognised mode of communication, within

two (2) working days of receipt of the application ;

(d) In case the application has been found to be in order but the

distribution licensee refuses to give approval for open access

on the grounds of non-existence of necessary infrastructure

or unavailability of surplus capacity in the distribution network,

such refusal shall be communicated to the applicant by e-mail

or FAX or by any other usually recognized mode of

communication, within the period of three (3) working days

from the date of receipt of the application, along with reasons

for such refusal ;

(e) The generating station shall pay the wheeling charge to the

distribution licensee in accordance with sub-regulation (2) of

No. 17-2]

The J&K Govt. Gazette, 24th July, 2015/2nd Asad., 1937.

61

–––––––—–––––––––––––––––––––––––––––––––––––––––––––––———

Regulation 21 contained in Chapter 5 of these regulations.

The treatment of deemed generation in case of non-availability

of distribution system shall be settled mutually between the

generating station and the distribution licensee.

CHAPTER 12

Information System

54. Information system.––The State Load Dispatch Centre shall

post following information on its website in a separate web page titled

“Open access information” and also issue a monthly and annual report

containing such information :––

(1) A status report on long-term/medium-term/short-term open

access by consumers and generating stations including limited

short-term open access and open access by embedded

consumers indicating––

(a) Name of open access consumer/generating station ;

(b) Period of open access granted (date of commencement

and date of termination) ;

(c) Schedule of power from distribution licensee for each

day (applicable to embedded open access consumers) ;

(d) Schedule of power through open access period for each

day (applicable to embedded open access consumers) ;

(e) Schedule of open access period for each day (applicable

to limited open access consumers) ;

(f) Point of injection ;

(g) Point of drawal ;

(h) Transmission system/distribution system used ; and

(i) Open access capacity used.

62

The J&K Govt. Gazette, 24th July, 2015/2nd Asad., 1937.

[No. 17-2

––––––––––––––––––––––––––––––––––––––––––––––—–––—————

(2) Peak load flows and capacity available including the reserve

capacity on all EHV lines and HV lines emanating from EHV sub-stations.

(3) The information regarding average loss in transmission and

distribution system as determined by respective licensees.

CHAPTER 13

Miscellaneous

55. Under Utilisation or Non-Utilisation of open access capacity

in Intra-State transmission and distribution system :

(1) Long-Term Access.––A long-term customer may relinquish the

long-term access rights fully or partly before the expiry of the full term of

long-term access, by making payment of compensation for stranded capacity

as follows :––

(a) Long-term customer who has availed access rights for at least

12 years :

(i) Notice of one (1) year - If such a customer submits an

application to the Nodal Agency at least 1 (one) year

prior to the date from which such customer desires to

relinquish the access rights, there shall be no charges ;

(ii) Notice of less than one (1) year - If such a customer

submits an application to the Nodal Agency at any time

lesser than a period of 1 (one) year prior to the date from

which such customer desires to relinquish the access

rights, such customer shall pay an amount equal to 66%

of the estimated open access charges (net present value)

for the stranded transmission and/or distribution capacity

for the period falling short of a notice period of one (1)

year.

No. 17-2]

The J&K Govt. Gazette, 24th July, 2015/2nd Asad., 1937.

63

–––––––—–––––––––––––––––––––––––––––––––––––––––––––––———

(b) Long-term customer who has not availed access rights for at

least 12 (twelve) years :

Such customer shall pay an amount equal to 66% of the

estimated open access charges (net present value) for the

stranded transmission and/or distribution capacity for the period

falling short of 12 (twelve) years of access rights :

Provided that such a customer shall submit an application to

the Nodal Agency at least 1 (one) year prior to the date from

which such customer desires to relinquish the access rights :

Provided further that in case a customer submits an application

for relinquishment of long-term access rights at any time at a

notice period of less than one year, then such customer shall

pay an amount equal to 66% of the estimated open access

charges (net present value) for the period falling short of a

notice period of one (1) year, in addition to 66% of the estimated

open access charges (net present value) for the stranded

transmission and/or distribution capacity for the period falling

short of 12 (twelve) years of access rights.

(c) The discount rate that shall be applicable for computing the

net present value as referred to in clause (a) & (b) of

sub-regulation (1) above shall be the discount rate to be used

for bid evaluation in the Central Commission’s Notification

issued from time to time in accordance with the Guidelines for

Determination of Tariff by Bidding Process for Procurement

of Power by distribution licensees issued by the Ministry of

Power.

(d) The compensation paid by the long-term customer for the

stranded transmission and/or distribution capacity shall be used

for reducing transmission and/or wheeling charges payable

by other long-term customers and medium-term customers in

the year in which such compensation payment is due in the

ratio of open access charges payable for that year by such

long-term customers and medium-term customers.

64

The J&K Govt. Gazette, 24th July, 2015/2nd Asad., 1937.

[No. 17-2

––––––––––––––––––––––––––––––––––––––––––––––—–––—————

(2) Medium-term open access customers.–– A medium-term

open access customer may relinquish rights, fully or partly, by giving at

least 30 days prior notice to the Nodal Agency :

Provided that the medium-term open access customer relinquishing

its rights shall pay applicable open access charges for the period of

relinquishment or 30 days whichever is lesser.

(3) Short-term open access customer.––

(a) The short-term open access schedules accepted by the Nodal

Agency in advance or day-ahead basis may be cancelled or

revised downwards on an application to that effect made to

the Nodal Agency by the short-term open access customer :

Provided that such cancellation or downward revision of the

short-term open access schedules shall not be effective before

expiry of a minimum period of two (2) days : Provided further

that the day on which notice for cancellation or downward

revision of schedule is served on the Nodal Agency and the

day from which such cancellation or downward revision is to

be implemented, shall be excluded for computing the period of

two (2) days.

(b) The person seeking cancellation or downward revision of short-

term open access schedule shall pay the open access charges

for the first two (2) days of the period for which the cancellation

or downward revision of schedule, as the case may be, has

been sought, in accordance with the schedule originally

approved by the Nodal Agency, and thereafter in accordance

with the revised schedule prepared by the Nodal Agency during

the period of such cancellation or downward revision.

(c) In case of cancellation, scheduling and system operation

charges specified in Regulations 22 contained in Chapter 5

shall be payable for two (2) days or the period of cancellation

in days, whichever is less.

No. 17-2]

The J&K Govt. Gazette, 24th July, 2015/2nd Asad., 1937.

65

–––––––—–––––––––––––––––––––––––––––––––––––––––––––––———

56. Computation of capacity availability for open access.––

(1) The capacity available for the open access shall be computed for each

transmission segment and for every sub-station by the STU following the

methodology given below :––

(a) Available open access capacity of a transmission system

segment : = (DC-SD-AC)+NC where, DC=Designed

Capacity of the transmission segment in MW, SD = Sustained

Demand in MW recorded in the segment, AC = Already

allotted capacity, but not availed in MW and NC = New

Capacity in MW expected to be added ;

(b) Available open access capacity of a sub-station: = (TC-SP-

AC)+NC where, TC= Transformer capacity of the sub-station

in MVA, SP= Sub-station peak in MVA, AC= Already allotted

capacity but not availed in MVA and New transformer capacity

in MVA expected to be added ;

(c) The STU shall update these values on monthly basis on the

first calendar day of the month and publish it in their website.

(2) The appropriate distribution licensee shall determine the available

capacity for allotment for the portion of the distribution system over which

open access has been requested for.

57. Curtailment priority.––When, because of constraints or

otherwise, it becomes necessary to curtail the open access service of the

customers, subject to the requirements of State Grid Code, the open access

to a distribution licensee shall be the last to be curtailed. Among others,

short-term open access customers shall be curtailed first, followed by the

medium-term open access customers followed by long-term open access

customers. SLDC shall frame guidelines for curtailment of open access

customers.

58. Powers to remove difficulties.––If any difficulty arises in giving

effect to any of the provisions of these regulations, the Commission may by

general or special order, direct the State Transmission Utility, State Load

66

The J&K Govt. Gazette, 24th July, 2015/2nd Asad., 1937.

[No. 17-2

––––––––––––––––––––––––––––––––––––––––––––––—–––—————

Dispatch Centre, Intra-State licensees and the open access customer,

to take such action, as may appear to the Commission to be necessary or

expedient for the purpose of removing difficulties.

59. Repeal and Savings.––(1) Save as otherwise provided in these

regulations, the J&K State Electricity Regulatory Commission (Terms and

Conditions for Open Access in Intra-State Transmission and Distribution)

Regulations, 2006, shall stand repealed from the date of commencement of

these regulations.

(2) Notwithstanding such repeal, anything done or purported to have

been done under the repealed regulations shall be deemed to have been

done or purported to have been done under these regulations.

(3) Open access customers to the Intra-State transmission system

and the distribution system in the State on the date of coming into force of

these regulations under an existing agreement/contract shall be entitled to

continue to avail such access to the transmission and distribution system.

However, the terms and conditions, as stipulated under these Regulations

shall be applicable from one month after the notification of these Regulations.

By order of the Commission.

(Sd.) ..........................

Secretary,

Jammu and Kashmir

State Electricity Regulatory Commission.

–––––––

No. 17-2]

The J&K Govt. Gazette, 24th July, 2015/2nd Asad., 1937.

67

–––––––—–––––––––––––––––––––––––––––––––––––––––––––––———

68

The J&K Govt. Gazette, 24th July, 2015/2nd Asad., 1937.

[No. 17-2

––––––––––––––––––––––––––––––––––––––––––––––—–––—————

No. 17-2]

The J&K Govt. Gazette, 24th July, 2015/2nd Asad., 1937.

69

–––––––—–––––––––––––––––––––––––––––––––––––––––––––––———

70

The J&K Govt. Gazette, 24th July, 2015/2nd Asad., 1937.

[No. 17-2

––––––––––––––––––––––––––––––––––––––––––––––—–––—————

No. 17-2]

The J&K Govt. Gazette, 24th July, 2015/2nd Asad., 1937.

71

–––––––—–––––––––––––––––––––––––––––––––––––––––––––––———

––––––

72

The J&K Govt. Gazette, 24th July, 2015/2nd Asad., 1937.

[No. 17-2

––––––––––––––––––––––––––––––––––––––––––––––—–––—————

No. 17-2]

The J&K Govt. Gazette, 24th July, 2015/2nd Asad., 1937.

73

–––––––—–––––––––––––––––––––––––––––––––––––––––––––––———

74

The J&K Govt. Gazette, 24th July, 2015/2nd Asad., 1937.

[No. 17-2

––––––––––––––––––––––––––––––––––––––––––––––—–––—————

EXTRAORDINARY

REGD. NO. JK—33

THE

JAMMU & KASHMIR GOVERNMENT GAZETTE

Vol. 128] Srinagar, Tue., the 4th Aug., 2015/13th Srav., 1937.

[No. 18-1

Separate paging is given to this part in order that it may be filed as a

separate compilation.

PART II––B

Notifications, Notices and Orders by Heads of Departments.

———–

GOVERNMENT OF JAMMU AND KASHMIR,

INDUSTRIAL TRIBUNAL-CUM-LABOUR COURT, J&K,

SRINAGAR.

File No. 102/L. C.

Date of Institution : 24-03-2008.

Date of Award : 15-05-2015.

––––––

Mushtaq Ahmad and Ors.

Petitioner

Versus

Jai Parkash Industries Ltd., Chander Kote, Jammu.

Respondent

_______

AWARD

1. Section 10 of the Industrial Disputes Act (herein referred to as

Act). Envisages that where the appropriate Government is of the opinion

that any industrial dispute exists or apprehended, it may at any time in

writing referred to the dispute or any matter appearing to be connected

with or relevant to the dispute to the Industrial Tribunal or the Labour

Court for adjudication.

2. The authority identified by the State Government under the Act

while having sufficient compliance with the provision of Act has made a

reference to this tribunal vide SRO No. 53 on dated 3rd of March, 2008 for

adjudication and passing an appropriate order. The reference made by the

Government broadly and pointedly after having proper consideration by the

Reconciliation Officer. The Government is of the opinion that industrial

dispute exists between Mushtaq Ahmad, Mohd. Shabir and Nasir Din V/s.

Jai Parkash Industries Ltd., Chander Kote. So in exercise of powers

conferred by clause (C) of sub-section (1) of the section 10 of Industrial

Disputes Act, 1947. The Government referred this dispute for adjudication

on the following issues :––

1. Whether the termination of services of above name workmen

is legally justified ?

2. If not, what relief, they are entitled ?

3. Fundamentally and primarily reference which made by the authority

to this tribunal is based on report submitted by the Conciliation Officer. As

per report cognizance of the case under reference was taken under Industrial

Disputes Act and as per reply of the management, the demand notice of

the union has been already fulfill and peitioners were the active member of

the union as there was a conflict between two union and they are representing

one and creating a trouble in smooth functioning of the work. So management

has abandoned their job due to their internal union conflict. So due to stiff

attitude of the management matter could not resolved in conciliation.

2

The J&K Govt. Gazette, 4th Aug., 2015/13th Srav., 1937.

[No. 18-1

––––––––––––––––––––––––––––––––––––––––––––––—–––—————

4. On receiving the reference this tribunal has issued the notice to

the respondent also. But they did not appear and ultimately on 04-12-2008

ex parte is initiated against respondent and petitioner was directed to lead

the ex parte evidence. Later on respondent appear and on their application

ex parte order has been set aside on 06-07-2011. But again they remain

absent. Resultantly again ex parte is initiated against them. Petitioners

have also adduced evidence in support of their claim.

5. Brief resume of the petitioner evidence is hereby reproduced for

just decision of the matter.

6. Petitioner Mushtaq Ahmad appeared as witness of his own claim

and stated that he was working as labourer with J. P. Industries from

October, 2004 as helper to telephone operator. This is an electricity project

at Chander Kote J. P. Industries is a constructing agency. From October,

2004 he was getting salary along with allowance amounting to Rs. 4500/-

per month. There was a labour union in the name of Chenab Hydro Power

Project Workers Union. Management is not allowing them to become a

member of the trade union under Trade Union Act. Petitioners refuse to

submit the resignation from membership of the union. In the month of August,

2005 they have been terminated by the management without any inquiry or

any notice neither they have any clear their account as per law. So they

move an application before the Labour Court.

7. Petitioner Nasir Din also appeared as witness and stated that he

was working with J. P. Industries in Baglihar Project as driver. So he was

skill worker having a driving license. He was getting about Rs. 8000/-

including allowances. He has joined the duty in January, 2003. He was

member of the Chenab Hydro Power Project Workers Union which is

registered under Trade Union Act. Management has directed them not to

join the union which is their legal right. On this he has been terminated by

the management in August, 2005 without giving any notice or conducting

any inquiry.

8. Petitioner Mohd. Shabir appeared as witness and stated that he

was appointed as driver in J. P. Industries in March, 2004 at Baglihar

No. 18-1]

The J&K Govt. Gazette, 4th Aug., 2015/13th Srav., 1937.

3

–––––––—–––––––––––––––––––––––––––––––––––––––––––––––———

Project. He was getting Rs. 4500/- per month. He was also terminated

along with other petitioner on account of membership of the union without

giving any notice or conducting any inquiry. He has not been paid any

compensation on the termination.

9. P. W. Abdul Ghani stated that he has been engaged as electrician

from the year 2001 to 2008 in the project. He knows the application No. 2

and 3 both of them work with him in the project. They have been engaged

as driver from the year 2003 to 2005. They are very good and disciplined

worker there were no complaint against them. When worker have joined

trade union, management was not happy with their association with the

trade union. Thereafter respondent all of sudden without any notice

terminated them.

10. P. W. Gulzar Mohd stated on an affidavit that he has worked

with J. P. Industries from 1998 to 2008, where these petitioners were also

posted as driver-worker at dam site company had some misunderstanding

with the petitioners on the point that why they have associated themselves

with the trade union of worker. Company has pressurized a many time to

leave their association with the union. Management ultimately terminated

them without giving any notice.

11. P. W. Bashir Ahmad stated on an affidavit duly sworn in that he

has also work in the J. P. Industries as helper with the driver from the year

2005 to 2008 at that time petitioner were also working as driver-worker at

dam site Baglihar Electrical Project, Chander Kote. There was

misunderstanding between petitioner and the management on the point that

they should left the association with the trade union. Petitioner refused to

leave the membership of the trade union due to this they have been terminated

from the job without any notice.

12. This is whole sum and substance of petitioners evidence in

ex parte.

13. I have thoughtfully considered the arguments advance by the

representative of the petitioner and had minute study and appreciation of

the evidence both oral as well as documentary available on file.

4

The J&K Govt. Gazette, 4th Aug., 2015/13th Srav., 1937.

[No. 18-1

––––––––––––––––––––––––––––––––––––––––––––––—–––—————

14. This court has to return the finding within the circumscribed

limits of the term of reference identified by the competent authority appointed

by Government we are not supposed and expected to travel beyond the

term set up for adjudication. What is required to be settled precisely is to be

finding out legality or otherwise action of the respondent management in

this case. In case where the action as taken up by respondent in termination

the services of the petitioners is illegal, assuming for the sake of arguments.

Then it is to be seen what appropriate relief can be given to the petitioner

on account of such illegal action.

15. Briefly petitioners were employee of the J. P. Industries which

definitely covered under section 2 (S) of the Industrial Disputes Act, 1947.

Because respondent have admitted before Conciliation Officer as per report

that these three workers were terminated due to their involvement in one

of the union and there was an internal union conflicts. So it is clear that

they are employees of the company. Respondents were duly summoned

but earlier they did not appeared and contest the reference in this tribunal.

However, respondents appear through their counsel Sudershan Kumar and

associate and file an application for setting aside ex parte order on

14-06-2011. The same application was allowed and this tribunal directed

them to file their objections. But later on they again remained absent. So

ex parte has been initiated against them.

16. Petitioners have claimed in this tribunal that management of Jai

Prakash Industries is main contractor of NHPC for construction of Baglihar

Hydro Project at Chander Kote. They have engaged petitioner No. 1 namely

Mushtaq Ahmad as helper of the telephone operator. Whereas Nasir Din

and Shabir Ahmed as driver in the project. In 2003/2004 they work hard as

per the discipline and norms of the company time to time and are well

trained as per requirement of the job. Petitioners has taken the membership

of the trade union, respondents objected their association of union and on

this score they have been terminated from their job without conducting any

inquiry or any notice of termination. Petitioner No. 1 was getting salary

Rs. 2870/- per month and other two petitioner was getting salary

No. 18-1]

The J&K Govt. Gazette, 4th Aug., 2015/13th Srav., 1937.

5

–––––––—–––––––––––––––––––––––––––––––––––––––––––––––———

Rs. 4050/- per month. So, finally prayed for issue of an award for

reinstatement with back wages.

17. In terms of evidence on record adduced by the petitioners, it is

abundantly clear that petitioner and witnesses have deposed with one voice

that petitioners were terminated verbally and they have stopped from entering

into the project by the management from 11-09-2005 because they have

taken the membership of a union. Respondent have not contested herein,

though they appeared before the Conciliation Officer and submitted that

these three individuals are the followers of the Union President viz.

Shri Sajad Ahmed and they have abandoned their job due to their internal

conflict. There is nothing on record which shows that respondents have

issued any notice with regard to their termination or they have conducted

any inquiry in the conflict/dispute. They have not been charge-sheeted also

which is clearly against the provision of the I. D. Act. Though it

has been come in the evidence that petitioners have joined the trade union,

so they have been terminated. Anyhow workers right to join the union

is a constitutional right of a worker and objection of the management to

restrained the applicants to join the union attracted unfair labour practice

under section 2 (r-a) and clause-1 of the Schedule Vth of the

I. D. Act, 1947. Workers have completed 240 days in a calendar year

continuously. So they are conferred with the right of workmen. Therefore,

respondent were under obligations to observe the mandate laid down under

Industrial Disputes Act.

18. So it is clearly established that petitioners have been terminated

by the employer without giving a proper chance of hearing and without

conducting inquiry. It is also established that petitioners have been terminated

on the ground that they have taken the membership of trade union which is

their legal right. Termination without any notice or inquiry is not a legally

justified termination.

19. In view of the above the termination of the petitioners by the

respondent management is illegal, invalid, unwarranted and uncalled for

and against the principle of natural justice. Therefore, the termination of

6

The J&K Govt. Gazette, 4th Aug., 2015/13th Srav., 1937.

[No. 18-1

––––––––––––––––––––––––––––––––––––––––––––––—–––—————

the petitioners by the respondent managements hereby set aside and

respondents are directed to reinstate the petitioners forthwith. Admittedly

petitioners have rendered services for more than 240 days in a calendar

year as required and if workmen have joined any trade union it is not against

the provision of the Act and they cannot be terminated on this point.

Respondents have not contested the case at all. So there is no evidence

which show that petitioners were working with some other agencies during

the pendency of the petition. Even petitioners have also not averred anything

about their unemployment.

20. So far as back wages in question is concerned, I realized that

admittedly there is no evidence on the file which shows that during the

pendency petitioners remain unemployed or not. Other side was in ex parte

petitioners have not adduced any evidence on this point. It is well settled

and it is necessary to consider the facts and circumstances of each case

before granting back wages. On this point I relied on judgement of Hon’ble

Bombay High Court 2012 LLR page 1034 relevant para 11 which is

reproduced as under :––

“Admittedly, as recorded above, petitioner is disabled and project

affected person. In the complaint, though very averments are

made i. e. he is unable to earn and run the family and also no one

else working in any Government Department and therefore, family

were suffering because of the poor condition and he has no source

of income, yet these averments have never been challenged and/

or remained unchallenged, are sufficient to defend the submission

made by the Learned Counsel appearing for the petitioner that

there was no evidence or material placed on record that he was

without job and was not earning anything during this period. These

averments as are not denied, the observation that the burden lies

upon the respondent to prove the same is not correct. I am,

therefore, inclined to accept the averments made that he was not

earning during this period, as he was out of job during this period.

It is well settled and it is necessary to consider the facts and

circumstances of each case before granting back wages a case is

made out to modify the order and direct the petitioner to pay 50%

No. 18-1]

The J&K Govt. Gazette, 4th Aug., 2015/13th Srav., 1937.

7

–––––––—–––––––––––––––––––––––––––––––––––––––––––––––———

back wages. I am inclined duce 50% also for the reasons that

admittedly, the respondent never rendered services during this

period with the petitioner. The reduction to 50% back wages in

my opinion is proper and reasonable compensation.

21. This is case where petitioners have been terminated illegally in

the year 2005 and matter is long pending petitioners have not work with the

J. P. Industries. There is no evidence which shows that they have works

somewhere else also. Keeping in mind facts and circumstances of the case

respondents is hereby directed to pay 50% of back wages from the date of

termination till reinstatement. Accordingly an award is passed in favour of

the petitioners and against the respondent management. Copy of the award

be sent to the Government of J&K through its Commissioner/Secretary,

Labour Department for information and for publication in the Government

Gazette.

Announced :

15-05-2015.

(Sd.) ZUBAIR AHMAD RAZA,

District and Sessions Judge

(Presiding Officer),

Industrial Tribunal-cum-Labour Court, J&K.

8

The J&K Govt. Gazette, 4th Aug., 2015/13th Srav., 1937.

[No. 18-1

––––––––––––––––––––––––––––––––––––––––––––––—–––—————

EXTRAORDINARY

REGD. NO. JK—33

THE

JAMMU & KASHMIR GOVERNMENT GAZETTE

Vol. 128] Srinagar, Tue., the 4th Aug., 2015/13th Srav., 1937.

[No. 18-2

Separate paging is given to this part in order that it may be filed as a

separate compilation.

PART II––B

Notifications, Notices and Orders by Heads of Departments.

———–

GOVERNMENT OF JAMMU AND KASHMIR,

INDUSTRIAL TRIBUNAL-CUM-LABOUR COURT,

SRINAGAR, JAMMU.

File No. 268/ITLC.

Date of Institution : 16-09-2013.

Date of Award : 04-06-2015.

––––––

Om Parkash S/o Shripat

Versus

Project Manager, IHDP,

R/o Tandar, Tehsil Chenani

Udhampur

and District Udhampur.

In the Master of :—Application under section 33 C (2) of Industrial

Disputes Act, 1947.

_______

AWARD

1. This is an application preferred by the petitioner under

section 33 C (2) of Industrial Disputes Act, on the ground that he was

working jobber in the Handlooms Corporation in Sewana C. F. C., Chenani

under the Project Manager, I. H. D. P., Udhampur, This tribunal has been

pleased to passed an award dated 22-03-2013 on a reference made by the

Government of J&K vide SRO-437 dated 30-11-2010 in favour of the

petitioner against the respondent. Copy of award annexed with the file. So

petitioner entitled to received from the respondent the said money/benefit

as per award and accordingly petitioners have prepared a statement of the

all benefits for which he is entitled. Total amount calculated by the petitioner

is Rs. 10,62,776/- and finally prayed for computing amount in money and to

determined the amount due to the petitioner and same be recovered by the

respondent and paid to the petitioner.

2. On the presentation of this application notice has been issued to

other side. Respondent appeared through their counsel and file their

objections. In objection respondent has alleged that petitioner is not a

permanent employee of non-applicant so question of calculation of salary

and other benefit could not be calculated. Until and unless employees first

regularized in service and thereafter Board of Director may later such

decision of further course of action. Respondent have denied about the

knowledge of award because same has been passed in ex parte.

3. I have heard Ld. Counsel for both sides and also perused the file.

Petitioner’s seek the computation of an award which has been already

passed by this tribunal vide its order dated 22-03-2013 against the respondent.

By virtue of the award petitioner held to be entitled for full back wages

w. e. f. July, 1992 to ending February, 1997 and till his retirement age

i. e. 31-03-2009 along with all other benefits of retirement, As the same is

awarded in favour of the petitioner. In this application petitioner has alleged

that he is entitled to receive an amount of Rs. 10,62,776/- as salary from

1992 to March, 2009, gratuity, leave salary, C. P. Fund along with interest.

2

The J&K Govt. Gazette, 4th Aug., 2015/13th Srav., 1937.

[No. 18-2

––––––––––––––––––––––––––––––––––––––––––––––—–––—————

Whereas other side has not respondent properly against the contention of

petitioner but as per them applicant was not a permanent employee of the

respondent so the question of calculation of salary could not arises. As per

them first of all his service is to be regularized after that question of benefits

comes into play.

4. Final award has been already passed by this tribunal in which it

has been held that petitioner is entitled all the benefits because termination

of the services of the petitioner by the respondent has been held illegal, so

order is quashed. As per petitioner’s counsel, petitioners junior have been

regularized as permanent employee so he is also entitled as per service

rules. But under section 33 C (2) this court has compute in money which is

due to a workman from an employer under a settlement a or an award.

Which is reproduced as under—

“(2) Where any workman is entitled to receive from the employer

any money or any benefit which is capable of being computed in

terms of money and if any question arises as to the amount of money

due or as to the amount at which such benefit should be computed,

then the question may, subject to any rules that may be made under

this Act, be decided by such Labour Court as may be specified in this

behalf by the appropriate Government”.

5. So in view of above, at this stage this court cannot go into depth of

matter but only compute the money is due from the employer to the petitioner.

Petitioner has given in detail of total amount which has not objected by

other side, but petitioner has wrongly shown some amount of C. P. Fund

which has not been deposited by him in his account so he is not entitled for

such amount. As per award petitioner is entitled for salary from July, 1992

to March, 2009. I have considered the detail given by petitioner and total

salary amount come to Rs. 7,89,404/- whereas gratuity amount came to

Rs. 62,827/- and leave salary as shown by petitioner is Rs. 37,994/- so total

amount of all benefits as per the award is Rs. 8,90,225/-. As such the

respondent is hereby directed to pay the above-mentioned amount to the

employee within three month from today failing which petitioner shall also

No. 18-2]

The J&K Govt. Gazette, 4th Aug., 2015/13th Srav., 1937.

3

–––––––—–––––––––––––––––––––––––––––––––––––––––––––––———

be entitled to interest on the awarded amount @ 9% per annum till final

realization of the wages. A copy of the award be sent to appropriate Govt.

for necessary action under law. File shall go to record after its due

completion.

Announced :

04-06-2015.

(Sd.) ZABAIR AHMAD RAZA,

District and Sessions Judge

(Presiding Officer),

Industrial Tribunal-cum-Labour Court,

J&K, Jammu.

4

The J&K Govt. Gazette, 4th Aug., 2015/13th Srav., 1937.

[No. 18-2

––––––––––––––––––––––––––––––––––––––––––––––—–––—————

EXTRAORDINARY

REGD. NO. JK—33

THE

JAMMU & KASHMIR GOVERNMENT GAZETTE

Vol. 128] Srinagar, Tue., the 4th Aug., 2015/13th Srav., 1937.

[No. 18-3

Separate paging is given to this part in order that it may be filed as a

separate compilation.

PART II––B

Notifications, Notices and Orders by Heads of Departments.

———–

GOVERNMENT OF JAMMU AND KASHMIR,

INDUSTRIAL TRIBUNAL-CUM-LABOUR COURT,

SRINAGAR/JAMMU.

File No. 77/LC.

Date of Institution : 14-09-2007.

Date of Award : 17-04-2015.

––––––

President/General Secretary, Hindustan Coca Cola Bev. Pvt. Ltd., Worker

Union, Gangyal, Jammu, C/o B. M. S. Office, Parade, Jammu.

Versus

Area General Manager, Hindustan Coca Cola Bev. Pvt. Ltd.,

47-50, Gangyal, Jammu.

_______

AWARD

As per SRO-253 dated 11th July, 2007 Government of J&K has

made a reference to this tribunal for adjudication on point of reference. On

receiving the reference this tribunal has issued notices to both side and both

side appeared and they have filed their claim and counter objection in the

reference now the file was fixed for the evidence of the petitioner but on

last date of hearing i. e. 16-04-2015. Authorized Representative of petitioner

has made a request in open court that all the demand of the workers as

mentioned in the terms of reference have been already fulfilled. So he

don’t want to persue the case anymore. As such he wants to withdraw

from the reference. Otherside has also stated same version in open court.

AR for petitioner was directed to think over the matter properly and then

moved proper application after consulting the claimant.

Today Sh. Laxman Ravinder Singh has preferred an application for

withdrawal from the point of reference as demands which have mentioned

in their petition before the Conciliation Officer and in reference before this

tribunal have been fulfilled. As such he has given application in writing and

in support of his application statement has been also recorded it becomes

part of the main file. AR for respondent also present he has also accepted

that there is no dispute remaining between the parites so if case is consigned

to record company has no objection.

In view of the above this tribunal has come to the conclusion that as

per petitioners demand raised by the Worker Union of M/s. Hindustan

Coca Cola Beverage Pvt. Ltd. has been already fulfilled. So they have

moved an application for withdrawal of the point of reference. Case is

pending since a long and petitioner unable to bring any evidence up till now.

Petitioner is not interesting in pursuing the case. As such they have moved

application for withdrawal from the reference. I have considered the

application and satisfied that there is no need to proceed further in the

2

The J&K Govt. Gazette, 4th Aug., 2015/13th Srav., 1937.

[No. 18-3

––––––––––––––––––––––––––––––––––––––––––––––—–––—————

matter. Parties are not interested in pursuing the reference. Accordingly

reference is hereby dismissed as withdrawn. The reference is accordingly

replied. A copy of this order be sent to Govt. of J&K through Commissioner/

Secretary, Labour Department for information.

Announced :

07-04-2015.

(Sd.) ZUBAIR AHMAD RAZA,

District and Sessions Judge

(Presiding Officer),

Industrial Tribunal-cum-Labour Court,

J&K, Jammu.

No. 18-3]

The J&K Govt. Gazette, 4th Aug., 2015/13th Srav., 1937.

3

–––––––—–––––––––––––––––––––––––––––––––––––––––––––––———

JAMMU AND KASHMIR STATE ELECTRICITY REGULATORY

COMMISSION, SRINAGAR.

Notification No. 44-JKSERC of 2015

Dated 05-08-2015.

In exercise of powers conferred under section 138 read with

sections 60 and 71 (1) (e) of Jammu and Kashmir Electricity Act, 2010 and

in terms of Regulation 19 of JKSERC (Renewable Power Purchase

Obligation, its Compliance and REC Framework Implementation)

Regulations, 2011 and all other powers enabling it in this behalf, the Jammu

and Kashmir State Electricity Regulatory Commission hereby revises the

EXTRAORDINARY

REGD. NO. JK—33

THE

JAMMU & KASHMIR GOVERNMENT GAZETTE

Vol. 128] Srinagar, Wed., the 5th Aug., 2015/14th Srav., 1937. [No. 18-4

Separate paging is given to this part in order that it may be filed as a

separate compilation.

PART II––B

Notifications, Notices and Orders by Heads of Departments.

———–

Renewable Power Purchase Obligation (RPO) targets for the

FYs 2015-16 and 2016-17 and specifies the RPO targets for FY 2017-18

onwards up to FY 2021-22 Accordingly :––

1. The table under Regulation 7.1 of JKSERC (Renewable

Power Purchase Obligation, its Compliance and REC

Framework Implementation) Regulations, 2011 under the

caption “Renewable Purchase Obligation (RPO) Target” shall

be replaced by the following table :––

Year

Minimum quantum of purchase (in %)

from renewable energy sources

(in terms of energy equivalent in kWh)

––––––––––––––––––––––––––––––––––––––––––––––––––––––

Solar

Non-Solar

Total

(other RE)

––––––––––––––––––––––––––––––––––––––––––––––––––––––

2010-11

0.02

0.98

1.00

2011-12

0.10

2.90

3.00

2012-13

0.25

4.75

5.00

2013-14

0.25

4.75

5.00

2014-15

0.75

5.25

6.00

2015-16

0.75

5.75

6.50

2016-17

1.00

6.50

7.50

2017-18

1.25

7.25

8.50

2018-19

1.50

8.00

9.50

2019-20

1.75

8.75

10.50

2020-21

2.00

9.50

11.50

2021-22

3.00

9.50

12.50

2

The J&K Govt. Gazette, 5th Aug., 2015/14th Srav., 1937.

[No. 18-4

––––––––––––––––––––––––––––––––––––––––––––––—–––—————

2. In Regulation 6.1 under caption “Operating Period” of JKSERC

(Renewable Power Purchase Obligation, its Compliance and REC

Framework Implementation) Regulations, 2011 the words “valid till March

31, 2016 (i. e. up to the financial year 2015-16)” shall and shall always

be deemed to have been substituted by the words “valid till March 31, 2022

(i. e. up to the financial year 2021-22)”.

By order of the Commission.

(Sd.) ABDUL HAMID, KAS,

Secretary,

J&K State Electricity Regulatory Commission,

Srinagar.

No. 18-4]

The J&K Govt. Gazette, 5th Aug., 2015/14th Srav., 1937.

3

–––––––—–––––––––––––––––––––––––––––––––––––––––––––––———