सं या:- 1/पी०एम०सी०/ व वध/321/2008-240-- ढ़ाई करोड़ 6पये से अ/धक लागत के जल

संसाधन :वभाग क< प=रयोजना के काया>वयन हेतु जल संसाधन :वभाग के अ/धसूचना

सं- 1/पी०एम०सी०/:व:वध/321/2008-1413 Cदनांक 11 CदसEबर, 2008 वारा लागू SBD (Standard

Bidding Document) के Section-3 क< कंGडका- 28 क< उप कंGडका -28.1 को सEयक :वचारोपरांत

JनEन6पेण संशो/धत करने का Jनण,य लया जाता है :-

Sl.

No.

Clause

Provision as per Old Standard Bid

Document of WRD

Provision in Revised Standard Bid Document

1 Section-3 (Conditions of Contract)

28.

Extension of the Intended

Completion Date

Extension of the Intended Completion Date

28.1

The Engineer shall extend the Intended

Completion Date if a Variation is issued

28.1 The Engineer shall extend the Intended

Completion Date if a Variation as explained in

2

झारखडगजट(असाधारण) शु*वार, 23 माच,

2018

which

makes

it

impossible

for

Completion to be achieved by the

Intended Completion Date without the

Contractor taking steps to accelerate the

remaining work and which would cause

the Contractor to incur additional cost

clause 28.1 (a) is issued which makes it

impossible for completion to be achieved by the

Intended Completion Date without the Contractor

taking steps to accelerate the remaining work and

which would cause the Contractor to incur

additional cost.

28.1 (a) The Engineer shall also extend the

intended completion date in any of the following

events:-

(i) The employer does not give access to

a part of the site by the site possession date

stated in the contract data.

(ii) Other contractors, public authorities,

utilities or the Employer does not work within the

dates.

(iii) Other constraints such as Public

protest,

unapproachable

working

site,

unforeseen circumstances and reasons which

cause delay or extra cost to the contractor.

(iv)

Force

majeure

(eg.Natural

Calamities)

or

conditions

beyond

the

control of the department.

2. Standard Bidding Document के अLतग,त जल संसाधन :वभाग वारा आमंNत एवं आमंNत Oकये

जाने वाले Jन:वदाओं तथा चल रहR योजनाओं पर उपरोSत संशोधन लागू होगा ।

3. इस संशोधन को जल संसाधन :वभाग के Standard Bidding Document मV कंGडका-28.1 के 6प

मV JतWथा:पत Oकया जाता है ।

4. उSत पर मंNप=रषद का अनुमोदन ाYत है ।

ह०/-

राजे ! "साद,

उप स/चव (अभ०) ।

------------