THE
JHARKHAND GAZETTE
EXTRAORDINARY
PUBLISHED BY AUTHORITY
7 Falgun, 1940(S)
Ranchi, Tuesday, 26th February, 2019
JHARKHAND STATE ELECTRICITY REGULATORY COMMISSION, RANCHI
Rooftop Solar PV Grid Interactive Systems and Net /Gross Metering
(1st Amendment) Regulations, 2019
---------------
NOTIFICATION
The 19thFebruary, 2019
Notification No. 67-- In exercise of the powers conferred by Clause (x) of sub-
section (2) of Section181 read with Section 50 of the Electricity Act 2003 (36 of
2003) and all power enabling it in that behalf, the Jharkhand State Electricity
Regulatory Commission hereby makes the 1st amendment in Jharkhand State
Electricity Regulatory Commission (Rooftop Solar PV Grid Interactive Systems and
Net/Gross Metering) Regulations, 2015.
1. Short title and commencement:
(i)
This Regulation may be called the “Jharkhand State Electricity Regulatory Commission
(Rooftop Solar PV Grid Interactive Systems and Net/Gross Metering) (1st Amendment),
2019.
(ii) It shall extend to the whole State of Jharkhand.
(iii) This shall come into force with effect from the date of publication in Jharkhand Gazette.
2. Inclusion of Definition
The term ‘Contracted Load or Contract Demand’ is reclassified as ‘Connected Load’ in
Clause 2.1 6) of the Principal Regulations
“Connected Load” means aggregate of the manufacturer’s rating of all energy
consuming devices, in the consumer’s premises, which can be simultaneously
used. In case manufacturer-rating plate is not available, the Licensee shall
measure actual load of the device. This shall be expressed in KW, KVA or HP
units and shall be determined as per the procedure laid down by the
Commission in the JSERC (Electricity Supply Code) Regulations 2015 and
subsequent amendments thereof;’
No. 163
2
Jharkhand Gazette (Extraordinary), Wednesday, 27th February, 2019
3. Modification of Definition
The definition of the term ‘Contracted Load’ or ‘Sanctioned Load’ or ‘Contract Demand’
is modified and is included as Clause 2.1 6) a of the Principal Regulations:
“Contracted Load or Sanctioned Load or Contract Demand” means the
maximum demand in kW, kVA or HP, agreed to be supplied by the Licensee
and indicated in the agreement executed between the Licensee and the
Consumer.”
4. Amendment in Clause 2.3
The above Clause of the Principal Regulations is amendedas follows:
“All proceedings under these Regulations shall be governed by the JSERC
(Conduct of Business) Regulations, 2016 and subsequent amendments
thereof.”
5. Amendment in Clause 3.1
The above Clause of the Principal Regulations is amended as follows:
“These Regulations shall apply to the Distribution Licensees, the eligible
consumers of the Distribution Licensees and third party owners of gross/net
metering arrangement of rooftop solar PV system in the State of Jharkhand.”
6. Amendment in Clause 3.3
The above Clause of the Principal Regulations is amended as follows:
“These Regulations do not preclude the right of the State authorities and
Distribution Licensees to undertake rooftop solar projects of 2 MWp and
above capacity through alternative mechanisms.”
7. Deletion of Clause 3.4
The above Clause of the Principal Regulations is deleted.
8. Amendment in Clause 4.2
The above Clause of the Principal Regulations is amended as follows:
“Provided that third party owners who have entered into a lease or
commercial agreement for the rooftop in the premises of the eligible
consumers, shall also be entitled to install rooftop solar PV system under
gross/net metering arrangement with the Distribution Licensee, for such
capacity which shall be cumulative of the prescribed limits of rooftop solar PV
capacity for each eligible consumer whose rooftop has been leased by the third
party owner.”
Jharkhand Gazette (Extraordinary), Wednesday, 27th February, 2019
3
9. Amendment in Clause 4.4
The above Clause of the Principal Regulations is amended as follows:
“Provided that the eligible consumer or third party owner availing net
metering arrangement under these Regulations shall not be allowed to apply
for gross metering arrangement within the same premises.”
10. Amendment in Clause 4.7
The above Clause of the Principal Regulations is amended as follows:
“If the eligible consumer or third party owner installs solar rooftop system
under the net metering scheme, such eligible consumer and individual
consumers who have leased out their premise to third party shall be entitled to
use the power generated from the rooftop solar PV system at their premises.
The surplus power can be injected to the distribution system of the Licensee at
the interconnection point.”
11. Amendment in Clause 5.1
The above Clause of the Principal Regulations is amended as follows:
“5.1 The maximum peak capacity of the grid connected rooftop solar PV
system to be installed by any eligible consumer shall not exceed 100% of the
Sanctioned Load /Contract Demand of the Consumer.”
12. Amendment in Clause 5.2
The above Clause of the Principal Regulations is amended as follows:
“5.2
The capacity of the grid connected rooftop solar PV system to be installed by any
eligible consumer or third party owner shall be from1 kWp to 2 MWp.”
13. Amendment in Clause 6.2
The above Clause of the Principal Regulations is amended as follows:
“6.2 Provided that the capacity to be allowed in the area fed from the
distribution transformer or any other transformer from which power is fed to
the eligible consumer is 100% of that distribution transformer or any other
percentage as may be fixed by the Commission of the rated capacity of such
transformer(s).
Provided that no application shall be rejected on the basis of inability to
support the proposed Solar rooftop PV project due to need for system
augmentation”
14. Amendment in Clause 7.1.(iv)
The above Clause of the Principal Regulations is amended as follows:
“iv Consumers shall submit the application to the Executive Engineer/Equivalent Officer of
the concerned Distribution Licensee along with a copy to JREDA;…”
4
Jharkhand Gazette (Extraordinary), Wednesday, 27th February, 2019
15. Amendment in Clause 7.2
The above Clause of the Principal Regulations is amended as follows:
“The Licensee shall acknowledge the receipt of the application form within two
(2) days of application, register the application and shall process the
application in the order of the receipt. The Licensee shall prepare a priority list
having validity of one eighty (180) days on the basis of the order of such
receipts. The priority list shall be prominently displayed in the local offices of
the Licensee and shall also be uploaded on the website of the Licensee.”
16. Amendment in Clause 7.5
The above Clause of the Principal Regulations is amended as follows and the
provisos are deleted:
“The Distribution Licensee shall on receipt of documents (if any) and removal of defects (if
any), submitted under Regulation 7.4, inform the approval within ten (10) days from the date of
receipt”
17. Amendment in Clause 8.1(iv)
The above Clause of the Principal Regulations is amended as follows:
“8.1(iv) Regulations and provisions framed under Section 53 of the Electricity Act 2003 and
subsequent amendments thereof shall be complied”
18. Amendment in Clause 8.2
The above Clause of the Principal Regulations is amended as follows:
“The connectivity levels at which the rooftop solar PV system shall be connected with the
distribution system are as specified below:
S. No.
Connected Load / Contract Demand of
Eligible Consumer
Connectivity Level
1.
Up to 5 kW
Single phase at 230 V
2.
5 kW and above up to 50 kW / 63 kVA
3 Phase, 4 wire at 415 V
3.
Above 50 kW and up to 1 MW
3 Phase at 6.6kV,
3 Phase at 11 kV
4.
Above 1 MW and up to 2 MW
3 Phase at 22 kV,
3 Phase at 33 kV
…”
19. Amendment in Clause 8.3
The above Clause of the Principal Regulations is amended as follows:
“The eligible consumers or third party owners using net metering arrangement
are allowed to use a battery backup system in conjunction with their net
metering system. A sample pictorial representation is given in Annexure VI for
explanation purpose only.”
Jharkhand Gazette (Extraordinary), Wednesday, 27th February, 2019
5
20. Amendment in Clause 9.4
The above Clause of the Principal Regulations is amended as follows:
“The location of appropriate meter(s) shall be in accordance with the CEA
(Installation and Operation of Meters), Regulations, 2006 as amended from
time to time and the JSERC (Electricity Supply Code) Regulations, 2015 as
amended from time to time.”
21. Amendment in Chapter IV “Energy Accounting”
The “Chapter IV: Energy Accounting” of the Principal Regulations is amended
as “Chapter V: Energy Accounting”
22. Addition after Clause 10.1
The above Clause is added in Principal Regulations as follows:
“10.1(A)
Energy injected into the grid from date of synchronization to
Commercial Operation Date (COD) will be considered as deemed energy
banking and the unutilized banked energy under net and gross metering
shall be considered as deemed purchase by Discom at the respective pooled
power purchase costs as determined by the JSERC for the applicable year.
Energy settlement shall be done on monthly basis.”
23. Amendment in Clause 10.2
The above Clause of the Principal Regulations is amended as follows:
“10.2 The case of rooftop solar PV system under gross or net metering
arrangement the Licensee shall undertake energy accounting and settlement
with either the eligible consumer or the third party owner whosoever is a
signatory of the interconnection agreement with the Licensee.”
24. Amendment in Clause 10.3(iii)
The above Clause of the Principal Regulations is amended as follows:
“iii) Provided that the Solar Injection Compensation to be paid by the
Distribution Licensee to the eligible consumer or third party owner as the case
may be shall be at the ratenotified by the Commission in its Tariff
Order/Individual Order for the relevant year in which Rooftop Solar PV
System is commissioned or as per Section 63 of the Act, as the case may be,
for that Distribution Licensee till the completion of plant life (25 years);
Provided further that in case the rate for any year is not specified or there is
a delay in the notification of the rate for any year, the previously notified rate
shall be applicable.”
6
Jharkhand Gazette (Extraordinary), Wednesday, 27th February, 2019
25. Amendment in Clause 10.4
The above Clause of the Principal Regulations is amended as follows:
“10.4 The energy accounting and settlement procedure for consumers or third
party owner installing and operating rooftop solar PV system under net
metering arrangement shall be as per the following procedure:
i.
…
ii.
....
iii. If the electricity supplied by the Distribution Licensee during any
billing period exceeds the electricity generated by the eligible
consumer’s rooftop solar PV system, the Distribution Licensee shall
raise invoice for the net electricity consumption after taking into account
any electricity credit balance remaining from previous billing periods;
Provided, in case the eligible consumer is under the ambit of time of day
tariff, as determined by the Commission from time to time, the electricity
consumption in any time block (e.g., peak hours, off-peak hours, etc.)
shall be first compensated with the electricity generation in the same
time block. Any excess generation over consumption in any time block in
a billing cycle shall be carried forward to the corresponding time block
in the subsequent month for adjustment purpose.
Provided also that the excess electricity measured in kilo-watt
hour/kVAh may only be utilized to offset the consumption measured in
kilo-watt hour/kVAh and may not be utilized to compensate any other fee
and charges imposed by the Distribution Licensee as per the instructions
of Commission
Provided also at the end of each settlement period, any electricity
credits, which remain unadjusted, shall be paid by the Distribution
Licensee at the ratenotified by the Commission in its Tariff
Order/Individual Order for the relevant year for that Distribution
Licensee.
Provided further that in case the rate for any year is not specified or
there is a delay in notification of the rate for any year, the previously
notified rate shall be applicable till notification of the latest rate.
Provide further that at the beginning of each settlement period,
cumulative carried over electricity credits shall be reset to zero.
iv
There shall be no deemed generation charges payable to the
eligible consumer or third party owner.
Jharkhand Gazette (Extraordinary), Wednesday, 27th February, 2019
7
v. In case the applicable tariff provides for billing on kVAh basis, the net
drawl or injection of energy shall also be measured in kVAh.
vi. When an eligible consumer leaves the system, that consumers unused
electricity credits shall be paid at the rate determined in accordance
with Regulation 10.4(iii) of these Regulations. …”
26. Amendment in Chapter IV “Miscellaneous”
The “Chapter IV: Miscellaneous” of the Principal Regulations is amended as
“Chapter VI: Miscellaneous”
27. Addition after Clause 17.1
The above Clause is added in Principal Regulations as follows:
“A18:POWER TO REMOVE DIFFICULTIES
18.1 If any difficulty arises in giving effect to the provisions of these
Regulations, the Commission may, by general or specific Order, make such
provisions not inconsistent with the provisions of the Act as may appear to it
to be necessary for removing such difficulty.”
28. Amendment in Annexure-II: Fee Structure
The above Clause of the Principal Regulations is amended as follows:
“APPLICATION FEES
S. No.
Connected Load / Contract Demand of
Eligible Consumer
Amount
1.
Up to 50 kW / 63 kVA
Rs 250
2.
Above 50 kW and up to 1 MW
Rs 750
3.
Above 1 MW and up to 2 MW
Rs. 1500
The amount of application fee for eligible consumer and third party ownerother
than the owner of the premises shall be the amount mentioned above.
REGISTRATION FEES
S. No.
Connected Load / Contract Demand of
Eligible Consumer
Amount
1.
Up to 50 kW / 63 kVA
Rs 1000
2.
Above 50 kW and up to 1 MW
Rs 2500
3.
Above 1 MW and up to 2 MW
Rs. 5000
8
Jharkhand Gazette (Extraordinary), Wednesday, 27th February, 2019
The amount of registration fee for eligible consumer and third party owner other
than the owner of the premises shall be the amount mentioned above.”
29. Amendment of Term “RSPV Regulations, 2015”
The above Clause of the Principal Regulations is amended as follows:
The term ‘RSPV Regulations, 2015’ is replaced by ‘RSPV Regulations, 2015
and amendments thereof’ in Annexure-III-9, Annexure-V(A)-6.1 and
Annexure-V(B)-1.1 & 2.1(iv) of the Principal Regulations.
30. Amendment in Annexure-V(A): Inter connection Agreement
The
above
Clause
of
the
Principal
Regulations
is
amended
as
follows:……………
The
Eligible
Consumer
or
third
party
owner,
by
the
name
of
……………………………………………owning or leasing or having commercial
rights to the premises at (address) ………………………………………………as
first party………………
And whereas, the ……………………………… (Name of the Licensee) agrees to
provide grid connectivity to the eligible consumer for injection of the electricity
generated from their plant of capacity ……… kilowatts into the power system
of Licensee and as per conditions of this agreement and Gross/net- metering
regulations/orders issued by the Jharkhand State Electricity Regulatory
Commission.…………
2.
Technical and Interconnection Requirements
2.1. The First Party agrees that the Rooftop Solar PV generation plant gross
metering system will conform to the standards and requirements specified in
these regulations and in the following Regulations and codes as amended from
time to time.…………
2.2. First Party agrees that it has installed or will install, prior to connection of
Photovoltaic system to Licensee’s distribution system, an isolation device (both
automatic and inbuilt within inverter and external manual relays) and agrees
for the Licensee to have access to and operation of this, if required and for
repair & maintenance of the distribution system.
2.3. First Party agrees that in case of a power outage Licensee’s system,
photovoltaic system will disconnect/isolate automatically and the plant will not
inject power into Licensee’s distribution system.”........
7 Connection Costs
7.1 The First Party shall bear all costs related to setting up of photovoltaic
system including metering and interconnection costs.”.......”
Jharkhand Gazette (Extraordinary), Wednesday, 27th February, 2019
9
31. Amendment of Terms “eligible consumer”&“Licensee”
The above Clause of the Principal Regulations is amended as follows:
In Annexure-V(B): Inter connection Agreement of the Principal Regulations, all the instances
of the term “eligible consumer” are replaced by “First Party” and “Licensee” by “Second
Party”
32. Amendment in Annexure-V(B): Inter connection Agreement
The above Clause of the Principal Regulations is amended as follows:“…....
The
Eligible
Consumer
or
third
party
owner,
by
the
name
of
……………………………………………owning
or
leasing
or
having
commercial
rights
to
the
premises
at
(address)
………………………………………………as first party…....
And whereas, the ……………………………… (Name of the Licensee) agrees
to provide grid connectivity to the eligible consumer for injection of the
electricity generated from their plant of capacity ……… kilowatts into the
power system of Licensee and as per conditions of this agreement and
Gross/net- metering regulations/orders issued by the Jharkhand State
Electricity Regulatory Commission.
Both the parties hereby agree to as follows:
1.
Eligibility
1.1. Eligibility for net-metering has been specified in the JSERC (Rooftop
Solar PV Grid Interactive System Gross / Net Metering) Regulations, 2015
(hereinafter referred to as RSPV Regulations, 2015). Eligible consumer or
third party owner is required to be aware, in advance, of the standards and
conditions his system has to meet for being integrated into grid/distribution
system.
2.
Technical and Interconnection Requirements
2.1. The First Party agrees that the Rooftop Solar PV generation plant and
net metering system will conform to the standards and requirements specified
in these regulations and in the following Regulations and codes as amended
from time to time.…
In witness, whereof, Mr. ……………………………………………… for and on
behalf
of
(Eligible
consumer
or
third
party
owner)
and
Mr.
……………………………………………… for and on behalf of (Licensee) sign
this agreement in two originals.”
By order of the Commission,
A.K. Mehta,
Secretary
Jharkhand State Electricity Regulatory
Commission.
-------------
Printed & Published by the Superintendent of Jharkhand Government Press, Doranda, Ranchi.
Jharkhand Gazette (Extraordinary) 163 -- 50.