THE
JHARKHAND GAZETTE
EXTRAORDINARY
PUBLISHED BY AUTHORITY
4 BHADRA, 1944 (S)
RANCHI, FRIDAY 26TH AUGUST, 2022
COMMERCIAL TAXES DEPARTMENT
--------
NOTIFICATION
26th August, 2022
Sub: Standard Operating Procedure (SOP)/Directive for post-GST payments of pending
bills related to work orders issued during pre-GST period.
S.O. No. 33 Dated 26 August, 2022--The matter relates to the Works Contract awarded by
the State Government departments/ local authorities in the pre GST period and payments and
execution of those Works Contract Services (partly or wholly) is to be made in the post GST period
i.e. from 1.07.2017.
The Goods and Services Tax (GST) has come into force w.e.f 1st July 2017 by subsuming
various indirect taxes such as Central excise duty, Service tax VAT, CST, Entry tax, etc. Subsequent
to the enactment of GST Act w.e.f. 01.07.2017, different work departments of State Government have
sought clarifications on modalities of treatment of pending bills of different contractors where in the
contract was awarded in pre-GST regime, i.e., VAT regime and the works has completed
partly/wholly after the implementation of GST. Hon’ble Jharkhand High Court has directed the
Government of Jharkhand to issue guidelines on this matter in its order dated 16-03-2021 in WP (T)-
2108/2019.
No. 422
2
Jharkhand Gazette (Extraordinary), Friday, 26th August, 2022
The main issue under consideration is for the payment of pending bills related to work order
issued during pre GST period and supply of Works Contract services is executed under GST regime
which is discussed as below;-
1.
The term “Works Contract” is defined under sec 2(lxiii) of JVAT Act, 2005 as follows-
" Works Contract” means and includes any agreement for carrying out for cash or deferred
payment or other valuable consideration, for assembling, construction, fabrication, erection,
installation, modification, fitting out, improvement or repair of any building, road, bridge or
commissioning of any other immovable or movable property.
2.
The term "Works Contract" is defined under sec 2(119) of JGST Act, 2017 as follows-
" A contract for building, construction, fabrication, completion, erection, installation, fitting out,
improvement, modification, repair, maintenance, renovation, alteration or commissioning of any
immovable property wherein transfer of property in goods (whether as goods or in some other
form) is involved in the execution of such contract”.
As per Para 6(a) of schedule II of JGST Act, 2017, Works Contract as defined in Sec 2(119)
shall be treated as supply of Services.
3.
Under JVAT Act 2005, works contracts covered both movable and immovable property
whereas "Works Contract" under GST is restricted only to immovable property. In this context,
under GST, construction, building, erection, installation services etc. involving supply of both
taxable goods along with labour and other services may be construed as composite supply*.
4.
The term composite supply is defined under Sec 2(30) of the GST Act as follows:-
*Composite supply means a supply made by a taxable person to a recipient consisting of
two or more taxable supplies of goods or services or both or any combination thereof, which are
naturally bundled and supplied in conjunction with each other in the ordinary course of
business, one of which is a principal supply.
Illustration: Where goods are packed and transported with insurance, the supply of goods,
packing materials, transport and insurance is a composite supply and supply of goods is a
principal supply.
In such cases the rate of tax shall be determined by applicable rate on principal supply.
5.
Before introduction of the GST, the tax was levied separately on services as service tax
by the central government and on goods used in the works contract attracted central excise
duty of centre and vat of state government. For any Works contract, the goods attracted
central excise duty and VAT and Services attracted service tax.
3 Jharkhand Gazette (Extraordinary), Friday, 26th August, 2022
Works Contract tasks
Tax type
Supply of Goods
VAT
Supply of Services
Services Tax
If
a new product emerges while a
Work Contract is being completed
Central Excise Duty
6. During VAT regime materials used in works contract or the goods as it may be called,
were taxable @5%, 5.5% or 14.5% or 14% and labour charges were not taxab le. Also, the
rate of Tax Deduction under JVAT Act was at Source (TDS) @ 4%. Whereas the Central taxes
were levied as service tax on services given by way of labour, design, architect etc. and central
excise duty on such goods manufactured.
7. Keeping in view the difficulties faced and feedback received so far and in compliance to
the direction given by the Hon’ble High Court of Jharkhand an SOP is being issued in
consultation with the departments concerned and after the approval of the Competent
Authority.
8.
Under the GST tax regime, the rate of GST on Works Contracts for Government work
was notified at 18% vide notification no-11/2017,CT(R) dated 28.06.2017. However, the rate of
GST on Works Contracts for Government work was reduced to 12% [Notification no. 20/2017-
CT (Rate) dated 22.08.2017].
However, vide Notification No. 22/2021,CT (Rate) Dated – 31/12/2021, rate has
been changed to –
Services
Rate of Tax
w.e.f
Work
contract
services
provided
to
Government
authorities
and
Government
entity.
18%
01-01-2022
Vide Notification No. 03/2022, Dated – 13/07/2022
Services
Rate of
Tax
W.e.f
Work
contract
services
provided
to
central
Government,
state
Government
and
local
authorities.
18%
18-07-2022
Composite supply of works contract involving
predominantly earth work (that is constituting more
than 75 % of the value of the work contract) provided
to the central Government, state Government, local
authorities.
12%
18-07-2022
4
Jharkhand Gazette (Extraordinary), Friday, 26th August, 2022
So in the period between 22.08.2017 till 17.07.2022 the rate of GST on Works
contract has been @ 12% for the service supplied to central government state government and
local authority.
9. Incidence of applicable taxes of Service Tax/VAT/ GST
Incidence of the applicable taxes shall be as follows:-
Sr.
No.
Completion of works
contract
Invoice Date
Payment Date
Applicability of Taxes
Applicable
TDS
Service
Tax
VAT on
Material used
GST
1 Up to 30.06.2017
Up to 30.06.2017 Up to 30.06.2017 Yes
Yes
No
VAT TDS
2 Up to 30.06.2017
Up to 30.06.2017 After 30.06.2017
Yes
Yes
No
VAT TDS
3 Up to 30.06.2017
After 30.06.2017
After 30.06.2017
No
No
Yes
GST TDS *
4 From 01.07.2017
From 01.07.2017
From 01.07.2017
No
No
Yes
GST TDS *
* TDS under GST is made applicable w.e.f. 01.10.2018. Provision of TDS was not applicable between
01.07.2017 to 30.09.2018
10.
Availability of Input Tax Credit (ITC) under GST
i.
Unlike the VAT regime, where ITC of central taxes (Service tax and central excise duty)
were not available for discharging state tax liability, and the credit of CST was also not
available, under GST all this taxes whether levied under SGST, CGST and IGST is
available for ITC credit (Except for credit of SGST/CGST only restricted to SGST/CGST
liability respectively). Further the ITC of both goods and services are now available.
Thus it removes the cascading effect of tax by facilitating seamless flow of credit. The
aim of GST is to remove the restrictions of ITC credit in the supply chain.
In the GST regime, the input tax credit of IGST, CGST and SGST charged on any
supply of goods and/or services used or intended to be used in the course of
furtherance of business is permissible. Works Contractor is eligible to avail ITC
credited to his electronic credit ledger on GST portal subject to conditions
prescribed therein.
It is also pertinent to mention that under GST regime cross utilization of credit
of Goods and Services are available to offset ones liability which was not available
during the pre GST regime.
ii.
It is also important to mention that under GST works contractors are eligible for
availing transitional ITC on stock of Goods purchased from 01.07.2016 onwards and
declared in the returns filed, by way of filing TRAN-1 and TRAN-2.
5 Jharkhand Gazette (Extraordinary), Friday, 26th August, 2022
11.
Payments for Work Contracts
The contract price is generally inclusive of all taxes in most of the contracts; these taxes
have now been subsumed under GST. In order to arrive at the incidence of applicable VAT/
Service Tax/ GST as mentioned at Para 9 above, the total work shall be categorized as follows:
(i)
Works completed up to 30.06.2017 and Billing completed by 30.06.2017.
(ii)
Works completed up to 30.06.2017 and Billing not completed by 30.06.2017.
(iii)
Works yet to be completed as on 01.07.2017.
JGST Act, 2017 shall be applicable for all the works mentioned above at (ii) & (iii).
12.
Following procedure may be adopted by various Executing Agencies/Authorities for
calculating the incidence of tax while making payments as per the provisions in the contracts:-
i. The Goods and Services in the various project under different major heads (like Earth, Sand,
Steel, Cement, Bitumen etc.) and for services (design, consultancy, security, architect etc.) are
to be intimated by the contractor and checked/ confirmed by the respective executing
agencies/authorities in consultation with the concerned higher authority/technical wing for
each of the Project.
ii. In order to compile the above information, an indicative Excel format is suggested for
guidance and attached as (Annexure-1). It indicates various Goods and Services in the various
project which attract various rates of taxes including Central Excise Duty, CST, VAT and other
taxes, which were already included in the contract price as per the original contract.
iii. Under VAT regime, Rate of tax on major commodities used in Works contract
were as under:-
Commodities
VAT(Rate of Tax)
Central Excise Duty (Rat
e of Tax)
Steel
5 %
12.36 %
Cement
14.5 %
12.36 %
Bitumen
5.5 %
12.36 %
For rate of Tax on other commodities Part B of schedule II of JVAT 2005 and First
Schedule and the Second Schedule to the Central Excise Tariff Act,1985 may be referred to.
6
Jharkhand Gazette (Extraordinary), Friday, 26th August, 2022
Similarly under GST, Rate of Tax on Goods and Services were:-
Commodities
GST(Rate of Tax)
Steel
18 %
Cement
28 %
Bitumen
18 %
For detailed rates of tax on other Goods and Services involved in execution of work
contracts, schedule I, II, III and IV to JGST 2017 may be referred to.
iv.
The same format can be used to compile the information for each ongoing project. The
Goods and Services in the various project should be checked and verified by the concerned works
department on the basis of bill of quantity, estimate, schedule of rate and other technical
specifications. The Pre-GST rate of tax such as Central excise duty/ VAT on materials and service tax
on services and post-GST rates (of SGST, IGST, CGST) on supply of works contract should be checked
and verified.
v. After completion of the said exercise, the costs on account of the subsumed taxes under
pre GST and post GST in the particular contract are to be finalized and agreed by concerned
state department and Contractor. That is to say the incidence of tax in pre GST and post GST
should be calculated that has been factored in the cost of project. The cost so arrived at be
compared from the original contract price to arrive at the actual balance of cost of the project
i.e. whether there is an increase or decrease in cost of the project.
vi. The state work department may receive certification from any accredited agencies/charted
accountant as deemed fit and accordingly the concerned state department shall assess the
incidence of total tax (inclusive of central and state taxes) applicable in the pre GST regime and
compare it with the total incidence of tax as applicable on such goods and services under the
GST regime.
vii.
While calculating the positive or negative impact of GST, the state department must
keep in mind the availability of ITC of goods and services both in case of GST unlike in the VAT
regime where ITC of services were not available.
13.
After comparing the net increase/decrease in tax liability to the total tax levied under
VAT regime and GST regime and also accounting the ITC availability, any conclusion
regarding negative or positive impact on cost may be arrived at.
14.
It may be clarified that under no circumstances there will be a revision of any
contractual values in the contract, in cases where the work has to be completed
before 30.06.2017 as per the contract, but the execution got delayed as a result of
delay on part of the contractor.
7
Jharkhand Gazette (Extraordinary), Friday, 26th August, 2022
15.
No revision of contractual value should be considered if there is no clause for
revision
in
contractual
value
due
to
ch
ange in the rate of tax is mentioned in the contract.
16.
As per section 51 of the Jharkhand GST Act, 2017 / the Central GST Act, 2017, GST–
TDS @ 2 % (1% CGST + 1 % SGST) must be deducted after 01.10.2018 from
payments to contractors / suppliers.
17.
The Administrative Departments should issue suitable instructions to the competent
agency/authority responsible for making payments to the works contractors to
implement this directive/SOP.
18.
For the sake of convenience and to explicitly explain the procedure for calculation of
incidence of tax in Pre and Post GST regime is being explained with an example in
Annexure I.
(File No. Va.Kar/Vividh/20/2020)
By the order of the Governor of Jharkhand,
Aradhana Patnaik,
Secretary,
Commercial Taxes Department,
Jharkhand, Ranchi.
Project/ Contract details
Table- I
Gross Original
Value of the
Works Contract
given prior to
GST
implementation
Value of of the
Works Contract
rendered upto
30.6.2017 as per
original contract
Balance value of the
Works Contract to be
rendered after
01.07.2017
Remarks
Rs. 200000
Rs. 100000
Rs. 100000
Half value of
the work
completed
before GST
and rest after
GST
*
Considering half the value of work i.e. of Rs. 1,00,000 is done in the
post GST period i.e. after 01.07.2017, the breakup of the
material/service cost is as under-
Table- II
Project
Contituents
Percentage of
Contituents
Gross Original
Value of the
Contract
Total
Pre GST
Post GST
(a) Gross
Value of
Contract
200,000
100,000
100,000
(b) Less:
Margin
20,000
10,000
10,000
(c) Cost of
the
Project
(a-b)
-
180,000
90,000
90,000
(d) Bitumen
17%
30,600
15,300
15,300
(e) Steel
8%
14,400
7,200
7,200
(f) Cement
12%
21,600
10,800
10,800
(g)
Aggregates,
Sand etc
16%
28,800
14,400
14,400
Jharkhand Gazette (Extraordinary), Friday, 26th August, 2022, 9
(h) Pipes
1%
1,800
900
900
(i) Oth.
Materials
1%
1,800
900
900
Electrical
item
15%
27,000
13,500
13,500
Labour
30%
54,000
27,000
27,000
100%
180,000
90,000
90,000
Project/ Contract details
The request from the works contractor has come for the escalation in the cost of contract, post GST allegedly on
account of increase in incidence of tax due to implementation of GST. A comparision has been made on that half
value of the left work i.e. Rs. 1,00,000 with incidence of tax in pre and post GST and their effective cost on the
project on account of these taxes thereof.
Table- III
GST
Implica
tions
(For
balanc
e
work)
Pre GST
GST
Basic
price
(Cost
excluding
Output VAT,
Input VAT &
Excise/
Service Tax)
Excise
duty/
service
tax
rate and
its
amount
of Excise
duty/Ser
vice tax
Input
VAT
rate
and
amoun
t of
input
VAT
Output
VAT rate
and
output
VAT
consideri
ng VAT
Input
Cost
Incl.
all
taxes
&
duties
GST
rate
GST
Amou
nt
GST
12%
work
contrac
t
Total
cost
under
GST
consider
ing GST
Input
Excess
cost
due to
GST
1
2
3
4
5
6
7
8
9=(2+8)
@ 12%
10=(2+8
)
11
Cost
of the
projec
t (a-b)
90,00
0
12%
Bitum
en
12,912
12%
(1549)
5.5%
(795)
5.5%
(44)
15,30
0
18%
2,324
1,828
14,740
Steel
6,108
12%
(733)
5%
(342)
5%
(17)
7,200
18%
1,099
865
6,973
Ceme
nt
8,270
12%
(992)
14.5%
(1343)
14.5%
(195)
10,80
0
28%
2,316
1,270
9,540
Aggre
gates,
Sand
etc
13,612
0%
(0)
5.5%
(747)
5.5%
(41)
14,40
0
5%
681
1,715
15,327
Pipes
763
12%
5%
5%
900
18%
137
108
871
10
Jharkhand Gazette (Extraordinary), Friday, 26th August, 2022
--------
झारखÖड राजकȧय मुġणालय
झारखÖड राजकȧय मुġणालय, राँची ɮवारा Ĥकाͧशत एवं मुǑġत
राँची ɮवारा Ĥकाͧशत एवं मुǑġत,
झारखÖड गजट
झारखÖड गजट (असाधारण
असाधारण)
) 422 -- 50
(92)
(43)
(2)
Oth.
Materi
als
693
12%
(83)
14%
(109)
14%
(15)
900
18%
125
98
791
Electri
cal
items
10,337
12%
(1240)
14.5%
(1679)
14.5%
(244)
13,50
0
0%
0
1,240
11,577
Labou
r
23,478
15%
(3522)
0%
(0)
0%
(0)
27,00
0
0%
0
2,817
26,295
Cost
of the
projec
t
76,173
8211
5058
558
90,00
0
6,682
9,943
86,115
-3,885
*
Pre GST
In above example it is assumed that cost of project inclusive of all taxes and duties excluding
profit margin is Rs. 90,000 as shown in column '6'.
*
The base price in column 2 has been arrived by back calculation from column 6 after deducting VAT
output considering VAT input, VAT input and Excise duty/service tax as mentioned in column 5,4,3
respectively .
*
So the aggregate cost arrived at in pre GST is Rs. 76173 + Rs. 8211(on account of central excise duty/
service tax) + Rs. 5058 (VAT on the raw material) + Rs. 558 (VAT on final works contract adjusting ITC)
totaling to Rs. 90,000.00.
*
For sake of convenience, the education cess and secondary & heigher education cess has not been
considered for calculation of central taxes in above example.
*
GST
Considering the base price of goods and services as specified in column 2, and applying the applicable
GST rate on such material/ services, the GST amount of RS. 6,682 has been calculated in column 8.
* During the period of 22.08.2017 to 17.07.2022 the GST rate on works contract has been 12%.
*
The GST rate of 12% on supply of works contract services would be applicable on the sum of basic price
of Rs. 76,173 specified in column 2 and GST amount as specified in column 8.
*
So the aggregate cost arrived in GST period is Rs. 76,173 + Rs. 9,943 adjusting the ITC, totaling amount
Rs. 86,115 which is Rs. 3,885 less than pre GST period.