Department of Industries
--------
NOTIFICATION
6th October, 2022
Jharkhand Electric Vehicle Policy
2022
Memo No. 06/U.Ni./Vividh(Electric Vehicle)-20/2021……..1089……..
1. INTRODUCTION
Historically, advancements in the Internal Combustion Engine (ICE) technology have driven growth in
the automobile sector, but lately, a host of factors including global warming, climate consciousness
and improvements in battery storage capacity etc. have ushered in a shift towards electric Vehicles
(EV). The Intergovernmental Panel on Climate Change (IPCC) in its latest report1 has already warned
that climate change is already ‘irreversible’ for centuries to millennia, ahead. Thus, to ensure
sustainability, it is imperative that the future of transportation is electric with zero emissions and
carbon footprint.
India is actively exploring cost-effective and viable solutions for sustainable development as well as
reducing its excessive dependence on oil imports. The Indian EV market is still at a nascent stage,
1Sixth Assessment Report (ipcc.ch)
No. 498
2
Jharkhand Gazette (Extraordinary), Friday, 7th October, 2022
comprising less than 1% of the total vehicle sales. However, the EV market has the potential to grow
significantly in the coming years, as sales are expected to witness high double-digit growth rates
annually till 2030. EVs have emerged as a promising and singular alternative that could help mitigate
the adverse environmental impact caused by conventional vehicles.
To further drive the growth of EV sector in the country, the Government of India is increasingly
pushing to develop appropriate monetary and fiscal responses to promote drive EV adoption in the
country. A differential GST regime for EVs has been implemented by the Government of India as it is
expected to help electric mobility gain momentum, under it, pure EVs have been kept in the 5% tax
slab of the GST.
Jharkhand, in the pursuit of giving fillip to the shift from fossil fuel based medium of transportation to
the electric medium with zero emissions and carbon footprint, trying to create a conducive eco-system
by formulating attractive policy framework. The policy will try to capture the expectation of players
from supply side as well as providing avenues for faster adoption of EV by demand side.
1.1.
Government Initiatives in transitioning to Electric Vehicles:
In Feb’19, the Government of India (GoI) approved the ‘Faster Adoption and Manufacturing of Electric
Vehicles Phase II’ (FAME-II) scheme with a financial outlay of Rs 10,000 crore to generate electric
vehicle demand in the country. In June 2021, the GoI notified the Production Linked Incentive (PLI)
scheme for ‘the National Programme on Advanced Chemistry Cell (ACC) Battery Storage’ (NPACC)
for enhancing India’s battery manufacturing capabilities by achieving a manufacturing capacity of 50
GWh. The NITI Aayog in April 2022 released the first draft of the ‘Battery Swapping Policy’ in an effort
to catalyze the large-scale adoption of Electric Vehicles by promoting the adoption of Battery
swapping technology implemented via ‘Battery as a Service (BaaS)’ business models.
1.2.
Electric Vehicles in India
Year
2015
2016
2017
2018
2019
2020
No. of Vehicles
(’000)
2
18
57
97
147
168
Percentage share of
EV in total vehicle
sales
0.01%
0.1%
0.29%
0.45%
0.65%
0.77%
2. EXISTING AUTOMOTIVEECOSYSTEM IN JHARKHAND:
Jharkhand is home to automobile industry with one of the India’s leading automobile industry began
manufacturing of commercial vehicle in early 1950s at Jamshedpur. More than 800 auto ancillary
industries including auto components units have been set up subsequently at Jamshedpur and
Adityapur to cater the needs of automobiles companies. Jamshedpur-Adityapur cluster is having
unique advantages like availability of uninterrupted power and water from JUSCO in addition to other
alternative sources of power from JBVNL, long history of industrial peace and ready access to Kolkata
and Haldia ports for ease of imports and exports.
All types of auto grade steels are being produced at Jamshedpur since 1980s. All necessary
infrastructures exist near Jamshedpur - Adityapur for auto ancillaries.
Jharkhand Gazette (Extraordinary), Friday, 7th October, 2022 3
3. VISION, OBJECTIVE AND STRATEGY
The Jharkhand Electric Vehicle Policy 2022aims at creating favorable atmosphere for setting-up of
Electric Vehicle manufacturing units in the state through creation of infrastructure facilities, skilled
manpower, encouragement of capital investment and technology up-gradation, development of
marketing network, development promotion, grants and concessions.
3.1.
Vision
To ensure balanced economic development of the state by favoring Electric Vehicle manufacturing
sector and to provide maximum benefits to all stakeholders by establishing Jharkhand as an EV hub
in India.
3.2.
Objectives
The main objectives of this policy are:
a) To make Jharkhand as most preferred destination for electric vehicle manufacturing units in
Eastern India
b) Faster adoption of EVs in state with a vision of achieving carbon neutral transport system.
c) To identify and address the key existing infrastructure gaps affecting the growth of Electric
Vehicle industry in the State.
d) To create a conducive environment for phase wise shift from Internal Combustion Engines
(ICE) to Electric Vehicles (EVs) by 2030.
e) Establishment of projects for the manufacturing of advanced chemistry cell (ACC) batteries
in Jharkhand by 2027.
f) To establish center of excellence for EV in partnership with Industry and Academia by
2027.
g) Target of 10% share of Electric Vehicle in overall new vehicle registration in the State by
2027 (All vehicles: 10%, 2 wheelers: 10%, 3 wheelers: 20%, 4 wheelers: 10%)
h) Setting up of at least one public charging station in a 3 km x 3 km grid or minimum of 50
charging stations per million population, whichever is higher
i)
Setting up of public charging station on highways at 25 km distance (on both sides of all
National highways and major State Highways).
j) Target for conversion of 15 years old Government owned/leased vehicles with Electric
Vehicle
3.3.
Strategy
a) Development of infrastructure facilities
b) Creation of a favorable atmosphere for setting up of electric vehicle manufacturing units
c) Capital investment promotion
d) Promotion of technology up-gradation
e) Financial grants-in-aid and concessions
f)
Market development and export promotion
g) Industrial facilitation and single window clearances
4
Jharkhand Gazette (Extraordinary), Friday, 7th October, 2022
4. VALIDITY OF THE POLICY
This policy will remain operational till five years from the date of notification of the Gazette.
5. SCOPE AND ELIGIBILITY OF THE POLICY
5.1.
Eligible Sector:
This policy covers following electric vehicle manufacturing units to be established in the state of
Jharkhand:
a. EV Automobiles*
A. Buses (only Electric Vehicle technology)
B. Four Wheelers {Electric (EV), Plug in Hybrid (PHEV) and Strong Hybrid (SHEV)}
C. Three-wheeler (Electric) including Registered E-Rickshaws
D. Two Wheelers (Electric)
* Vehicles as categorized in eligibility list of Scheme for Faster Adoption and Manufacturing of Electric
Vehicles in India Phase II (FAME India Phase II) shall be covered under this policy.
b. Tier-I, Tier-II and Tier-III Electric Auto-components manufacturing units of above four
automotive.
c. EV Ancillary units
d. EV Battery manufacturers2
e. Infrastructure for EV i.e. Charging Stations, battery swapping stations and others
5.2.
Eligible Organizations:
The following manufacturing organizations of eligible sectors given in sub-section 7.1 shall be eligible
for benefit under this policy:
a) Proprietorship firm
b) Registered partnership firm
c) Private Limited Company
d) Limited liability registered partnership firm
e) Public Limited Company
f) Government Company
g) State/Central Public Sector Undertaking
h) Joint Venture
6. POLICY IMPLEMENTATION
i.
Department of Industries, Government of Jharkhand shall be the nodal agency responsible for
implementation of this policy in the State.
ii.
Incentives under this policy shall be processed as per the provisions of Jharkhand Industrial
Investment Promotion Policy, 2021.
2 Batteries listed as being eligible under FAME India Phase II (having fulfilled all the eligibility and testing conditions as
specified under the scheme) and shall also include swappable models, where battery is not sold with the vehicle will be
eligible for the incentives.
Jharkhand Gazette (Extraordinary), Friday, 7th October, 2022 5
iii.
Units applying for incentive under this policy shall apply on the Single Window Clearance
(SWC) portal of the Department of Industries, Government of Jharkhand.
iv.
Department of Industries shall extend hand-holding support to the Investors setting up EV
manufacturing units in land allotment from Jharkhand Industrial Area Development Authority
(JIADA), land registration for private land and land use conversion and other applicable
clearances/ licenses/ NOCs.
7. FISCAL INCENTIVES
The Fiscal Incentives being offered under this policy would be in addition to the demand incentives
available in the FAME India Phase-II scheme of Government of India.
7.1.
Fiscal Incentives
All incentives shall be applicable to parties intending to set up or upgrade their facilities for
manufacturing of eligible sector as set forth in section 5.1 above:
S.No
Incentives
Description
1
Comprehensive
Project
Investment
Subsidy (CPIS)
a) MSME units shall be entitled to get CPIS for investments
made in fixed capital investment. Subsidy under CPIS for
MSME shall be admissible at the rate of 30% of
investments made in fixed capital investment.
b) Non MSME Units shall also be entitled to get
Comprehensive Project Investment Subsidy (CPIS) for
investment made in:
Plant and Machinery
Pollution Control Equipment
Environment friendly alternative power generation
equipment
Employee Welfare (EPF, ESI, Health Insurance
Scheme)
c) The qualifying amount of investment for subsidy for non
MSME units under CPIS will be calculated giving
weightage of 50% to investment made in Plant and
Machinery, 20% each to investment in pollution control
equipment and environment friendly alternative power
generation equipment and 10% to investment in employee
welfare (EPF, ESI, Health Insurance)
Type of Unit
Maximum
Limit
Maximum Admissible
Subsidy
Micro
30% of FCI
Rs. 2 Cr
Small
Rs. 7 Cr
Medium
Rs. 15 Cr
Non-MSMEs
Rs. 30Cr
d) Applicable CPIS will be disbursed to MSME units in two
installments with 50% in first year and balance 50% in
third year while for Non-MSME units, CPIS will be
disbursed in three installments with 50% in first year, 25%
in third year and balance 25% in fifth year.
e) SC/ST/Women/Differently abled Entrepreneurs will avail
6
Jharkhand Gazette (Extraordinary), Friday, 7th October, 2022
5% additional benefit under CPISi.e., over and above the
maximum limit of admissible subsidy of CPIS as
mentioned in the table drawn above (7.1 S. No.1.C). This
benefit shall be applicable only to residents of Jharkhand.
For the purpose of this clause, those persons will be
eligible for benefit under SC/ST category that are issued
caste / residential certificate to this effect by competent
authority as notified by Government of Jharkhand.
Similarly, those persons will be deemed to be of differently
abled category that are certified by a competent Medical
Board to have Differently abled of more than 40%
f) Industrial units entitled for benefits in the above category
under Government of India Scheme will not be eligible to
get benefits under the same category under this policy.
2
Stamp duty and
Registration fee
100% reimbursement of stamp duty and registration fee
for land directly purchased from the raiyats / acquired
through consent award (lessee of JIADA / industrial parks will
not be eligible for this benefits). This facility will be granted
only for the first transaction for a particular plot of land
3
Land Cost
50% rebate on prevailing land lease premium on the land
allotted by the State Government agencies and land will be
provided to units as upfront or in 10 equal installments in
five years will be applicable only for those units to whom the
land is allotted within a period of two years from the Date of
Notification of this policy and commence their production
within a period of 15 months from the date of land
allotment.
4
Quality
Certification
Assistance for obtaining quality certification from B.I.S. and
other internationally recognized institutions @ 100% of the
expenditure incurred up to maximum of Rs. 10.00 lakh
Units obtaining certification / accreditation under any of the
following internationally recognized / accepted standards will
be eligible for the benefit
•
ISO-9000 Quality Management System
Jharkhand Gazette (Extraordinary), Friday, 7th October, 2022 7
•
ISO-14000 Environmental Management System
•
BIS certification
•
ZED certification
•
Green Energy Certificate
•
Bureau of Energy Efficiency (BEE) Certificate
•
LEED Certification in New and renewable Energy
•
Internationally accredited eco-labels OKE-TEX 100
etc.
Any other nationally/ internationally accredited certification
that will enable better market positioning
5
Patent
Registration
Financial assistance of 50% of the expenditure incurred, up
to a maximum of Rs. 10 lakhs, per patent. Out of these a
maximum of Rs 4 lakh may be given on expenditure incurred
in filing of patent, attorney fees, patent tracking etc. and up to
maximum of Rs. 10 lakhs on final acceptance of the patent.
6
Grant for Cluster
Development
A grant of 15% of the total grant released by the
Government of India shall be offered by State Government
to Cluster schemes approved by Government of India for the
State to SPV/ promoter.
7
Incentive for
captive power
plant
100% Electricity duty of New or existing EV industrial units
setting up captive power plant shall be reimbursed after
payment of electricity duty for a period of five years for self
– consumption or captive use (i.e. in respect of power being
used by the plant) from the date of its commissioning.
8
Interest Subsidy
New MSME units and non MSME EV automobile and EV auto
component manufacturing units shall be entitled to interest
subsidy for timely payment @ 6% per annum on total loan
availed from public financial institutions / Banks for
period of five years from the date of Commercial Production
subject to total maximum limit of
a. Rs. 15 Lakhs for Micro Enterprises
8
Jharkhand Gazette (Extraordinary), Friday, 7th October, 2022
b. Rs. 50 Lakhs for Small Enterprises
c. Rs 1 Crore for Medium Enterprises
d. Rs. 3 Crores for non-MSME Sector units
Units which are classified as Non-performing Asset (NPA) at
the time of making the application will not be eligible to avail
such incentive.
In addition to the interest subsidy, the guaranteed fee charged
under the Credit Guarantee Trust for Micro and Small
Enterprises
(CGTMSE)
scheme
to
Micro
and
Small
Enterprises (MSEs) will be reimbursed to the enterprises to
improve the CGTMSE coverage for collateral free loans in the
state.
9
Anchor Unit
Subsidy
In addition to the incentives above, the Eligible Anchor Units
shall receive an additional 5% of the Capital Subsidy shall
be provided in addition to the incentive Comprehensive
Project Investment Subsidy (CPIS)mentioned in this Policy
in clause 7.1 (1). This is applicable to the First 2 Anchor
Units in a District. The details of the Anchor Units and the
procedure shall be detailed out in the Common Incentive
Disbursement Guidelines.
10
Early Bird
Subsidy
For the Units that come up within a period of two years from
the Date of Notification of this policy, Additional 5% of
capital subsidyshall be provided in addition to the incentive
Comprehensive
Project
Investment
Subsidy
(CPIS)mentioned in this Policy in clause 7.1 (1). The details
of the Early Bird Subsidy and the procedure shall be detailed
out in the Common Incentive Disbursement Guidelines.
Note: A unit belonging to SC/ST/Women/Differently abled Entrepreneurs and also fulfilling the pre-
requisite criteria of Anchor Unit Subsidy and Early Bird Subsidy will avail a maximum 10% additional
benefit under CPIS i.e., over and above the maximum limit of admissible subsidy of CPIS or an
amount of INR 3 Crore whichever is lower.
7.2.
Other Incentives
7.2.1. Setting up Waste Treatment plant
Non-MSME units will be provided subsidy of 50% on annual interest on loan taken in form of
reimbursement to set up Waste Treatment Plant for 5years upto maximum INR 1 crore per unit
Jharkhand Gazette (Extraordinary), Friday, 7th October, 2022 9
7.3.
EV ecosystem development Incentives
7.3.1. Demand side incentives3
The incentives are linked to the vehicle type—two-wheelers, three wheelers, four-wheelers and
buses—and to the vehicle use case. Vehicle models approved under FAME II Scheme of Govt of
India will be eligible for these incentives and the state incentives will be provided in addition to FAME
II incentives.
S.
No.
Vehicle Segment
Incentive available
Number of vehicles to
be incentivized
Maximum
incentive per
vehicle
1
e-2W (L1 & L2)
INR 5000/kwh
1,00,000
10,000
2
e-3W autos (L5M)
INR 5000/kwh
15,000
30,000
3
e-3W goods
carrier (L5N)
INR 5000/kwh
10,000
30,000
4
e-4W cars (M1)
INR 5000/kwh
10,000
1,50,000
5
e-4W goods
carrier (N1)
INR 5000/kwh
10,000
1,00,000
6
e-buses*
10% of vehicle** cost
1000
20,00,000
*Incentive shall be available for State Transport Undertaking (STU) buses only. State government
shall also consider extending support to STUs for procurement of additional e-buses, if required.
**Ex-factory cost
Note:
In case, Govt of India makes changes to FAME II incentives, Govt of Jharkhand will review the
same and accordingly make changes to the incentives offered by the state.
Govt. of Jharkhand will separately issue Standard Operating Procedure (SOP) detailing the
process to avail the benefit.
7.3.2. Interest Free Loans for State Government Employees:
100% interest free advance/loan on the purchase of first Electric Vehicle (2-wheeler and 4-wheeler) to
only Government employees of the State
3 Vehicles with advanced batteries listed as being eligible under FAME India Phase II (having fulfilled all the eligibility and
testing conditions as specified under the scheme) and shall also include swappable models, where battery is not sold with
the vehicle will be eligible for the incentives.
10
Jharkhand Gazette (Extraordinary), Friday, 7th October, 2022
7.3.3. Preference of EVs for Government Offices Use
All Government Departments / Offices, Public Sector Undertakings will give priority to hire EVs
vehicles for their official use and the above demand incentives will be applicable for the private
owners to purchase these vehicles. Government Departments /Offices, Public Sector Undertakings
will purchase EVs when such purchase is necessary and is allowed.
7.3.4. Road Tax
Buyers of EVs manufactured within and outside the State of Jharkhand and over the period of this
policy will be provided following exemptions as per the slabs.
Road Tax / Vehicle
Registration Fees
Manufactured within the State
Manufactured outside
the State
Exemption on Road
Tax
100% exemption for first 10,000
buyers
75% exemption for 10,001-15000
buyers
25 % exemption after 15000 buyers
upto policy period
25%upto policy period
Exemption from
Vehicle Registration
Fees
100% exemption for first 10,000
buyers
75% exemption for 10,001-15000
buyers
25 % exemption after 15000 buyers
upto policy period
25% upto policy period
7.3.5. Incentives on extended battery warranty and buyback agreement
i.
Applicable only for 2-wheeler and 3-wheeler vehicles
ii.
The policy will provide OEMs additional incentives (to be transferred to the customers) for
offering a minimum 5-year warranty for batteries
iii.
OEMs who offer buyback schemes for vehicles which are up to 5 years old at a value reduced
by not more than 7.5% per year of the age will be eligible for additional incentives
iv.
An OEM can avail both the incentives simultaneously however, the total incentive amount will
be limited to INR 12,000. This will be over and above the incentives mentioned in clause 7.3.1
and based on the net value after considering all the above incentives.
Jharkhand Gazette (Extraordinary), Friday, 7th October, 2022 11
S.No.
Vehicle Segment
Incentives
1
Assured Buyback, as described
above
6% of total vehicle cost capped at INR 10,000/-
2
Battery warranty of at least 5 years
4% of total vehicle cost capped at INR 6,000/-
7.3.6. Charging Infrastructure Incentives
i.
Public and semi-public charging stations (PCS and SPCS) will be eligible incentives as per the
below mentioned table.
ii.
The charging station shall be eligible for the incentives only after commencement of the
operation of the station.
iii.
Public and semi-public charging stations availing FAME II charging infrastructure incentive will
not be eligible for these incentives.
S.No.
Type of
PCS/SPCS
Incentive
Amount
Maximum
Incentive available
per PCS/SPCS
Maximum
number of
PCS/SPCS
to
be
Incentivized
1
Slow
60% of the cost*
INR 10,000
15,000
2
Moderate/fast
50% of the cost*
INR 5,00,000
500
3
Solar based fast#
70% of the cost
INR 7,00,000
500
Note: *Cost of charging station only (does not include land and any ancillary cost to set up
charging station).
#Generating at least 75% of annual electricity through solar energy.
iv.
This policy allows petrol pump to set up charging station subject to charging area qualifying for
fire and safety standard norms of relevant authorities under relevant acts/rules.
v.
Under this policy, the State Distribution Licensees (DISCOM) shall allow charging of EVs from
the existing connection of a consumer at the existing tariff, except from agriculture connection.
vi.
The tariff for new third party owned by EV charging infrastructure shall be as per the JSERC
tariff order for utilities dated 31.03.2018 and any amendments thereafter.
12
Jharkhand Gazette (Extraordinary), Friday, 7th October, 2022
8. OTHER NON-FISCAL BENEFITS:
i.
Urban local bodies shall be encouraged to provide lane and parking preferences to EVs,
subject to local traffic conditions.
ii.
Developers of new residential projects would be encouraged to provide option of buying EV-
ready parking from 2022 onwards
iii.
All the future public parking spaces, allotted by bidding process, shall provide free parking to
all the EVs.
9. IMPORTANT DEFINITION
9.1.
Definition of MSME, Large, Mega and Ultra Mega Projects:
i.
Definition of MSME will be as laid out by the Government of India,
ii.
Also, definition related to Existing Industrial Unit, New Industrial Unit, Sick Unit,
Expansion, Modernization and Diversification will be applicable as per definition provided
in Jharkhand Industrial Investment Promotion Policy 2021 (JIIP Policy 2021).
9.2.
Definition of Date of Production:
i.
Date of production means the date of commercial production of such new unit. In respect of
expansion/modernization/diversification,
it
refers
to
commercial
output
from
such
expansion/modernization/diversification.
ii.
Commercial production or commercial output means the factory is in commercial production
and the GST sale invoice has been issued to the customer(s). DIC/RD and Director of
Industries, Govt. of Jharkhand after verification shall issue date of production certificate to this
effect. In case of dispute related DIC/RD, the decision of Directorate of Industries shall be the
final and issue related to Directorate of Industries, the decision of Principal Secretary/
Secretary, Dept. of Industries shall be final.
9.3.
Definition of PCS and SPCS
i.
Public Charging Stations (PCS) consists of charging station, associated electrical
infrastructure, space for parking (with clearance), ingress/egress for vehicles and has open
(unrestricted) access for the public. Additionally, PCS must not have any usage restriction for
any EV user. For instance, PCS usage cannot be restricted by providing services only on a
subscription basis.
ii.
Semi- public charging stations (SPCS) consists of the charging stations, associated
electrical infrastructure, space for parking (with clearance), ingress/egress for vehicles and
has restricted access for the public (build in semi-public locations like existing commercial and
institutional buildings, including malls, shopping complex, hospitals, cinema halls/multiplexes,
office spaces, hotels, restaurants, etc.).
Jharkhand Gazette (Extraordinary), Friday, 7th October, 2022 13
iii.
Slow charger includes AC-001 and any charger (AC or DC) that delivers a maximum output
power of 3.3 kW per charging point, is compliant to the technical and safety standards as laid
down by CEA, and is type tested by an agency/lab accredited by NABL. 1 PCS/ SPCS
equivalent is at least 3 charging points of maximum 3.3 kW power output per charging point.
iv.
For any other charging station (other than slow) -
a. If the charging station has one charging gun, it will be equivalent to 1 PCS/SPCS
b. If the charging station has more than one charging guns, each charging gun will be
considered equivalent to 1 PCS/SPCS, provided all the charging guns can charge
vehicles simultaneously.
9.4.
Other Definitions
i.
Electric Vehicle (EV): Electric Vehicle (EV) refers to all automobiles using an electric motor
that is driven by batteries, ultra-capacitors or fuel cells. This includes all 2-wheeler, 3-wheeler
and 4-wheeler Hybrid Electric Vehicles (HEV), Plug in Electric Vehicles (PHEV), Battery
Electric Vehicles (BEV), and Fuel Cell Electric Vehicle (FCEV).
ii.
Electric Vehicle Battery: Electric Vehicle Battery refers to all energy storage systems used in
the defined EVs above. This includes Lithium-ion batteries, nickel metal hydride batteries, lead
acid batteries, ultra-capacitors and even fuel cells (direct methanol, alkaline, phosphoric acid,
molten carbonate, solid oxide, Sodium-ion and reversible fuel cells). Batteries permitted under
FAME-II guidelines will be considered as eligible Electric Vehicle Battery
iii.
Electric Vehicle Manufacturing units (EVMUs): All manufacturing enterprises manufacturing
Electric Vehicles will be eligible for incentives and concessions under this policy.
iv.
EV Battery Manufacturing or Assembly Units (EBUs): All EV battery or fuel cell
manufacturing will be eligible for incentives and concessions under this policy as per the
notification under S.O. 2208(E).—Production Linked Incentive (PLI) scheme, ‘NATIONAL
PROGRAMMEONADVANCED CHEMISTRY CELL (ACC) BATTERY STORAGE’ for
implementation of giga-scale ACC manufacturing facilities in India.4
v.
EV Battery Recycling Units (EVBRU): All EV batteries or fuel cell recycling units will be
eligible for incentives and concessions under this policy (except lead battery recycling units)
Categories of vehicles shall be eligible for demand incentives:
►
Buses (Only Electric Vehicle Technology)
►
Four Wheelers (Electric (EV), Plug in Hybrid (PHEV) and Strong Hybrid (SHEV)
►
Three wheelers (Electric) including registered e rickshaws
►
Two-wheeler (Electric)
10. MISCELLANEOUS
i.
Notwithstanding anything contained in the foregoing paragraphs of the Jharkhand Electric
Vehicle Policy 2022, the State Government by issuance of notification in the official gazette
may amend or withdraw any of the provisions and or the schemes mentioned herein above.
4https://dhi.nic.in/writereaddata/UploadFile/ACC%20Scheme%20Notification%209June21.pdf
14
Jharkhand Gazette (Extraordinary), Friday, 7th October, 2022
ii.
The Industrial Units which are getting benefitted under this policy will not be eligible for any
other financial incentives or benefits under any other schemes or policy of the Govt. of
Jharkhand unless specifically mentioned in this policy but they are eligible get benefit from any
policy or scheme of Govt. of India.
11. REVIEW AND MONITORING OF THE POLICY
i.
A high-level empowered committee will be formed under the Chairmanship of Chief Secretary
to regularly review implementation of all provisions of the policy and achieving the targets,
suggest, mid-course corrections etc. Interpretation of provisions of the policy and decision
thereon of this committee shall be the final.
ii.
Separate operation guidelines for administration of the policy with the approval of high-level
inter departmental review committee will be issued for the guidance of the concerned agencies
and officers
iii.
A working subcommittee meeting under the chairmanship of Director, Industries, Government
of Jharkhand will also be constituted to regularly monitor the implementation of the Policy. The
committee will ensure that, necessary facilitation is extended to the investors and provide
feedback to the High-Level Committee on the progress at regular interval.
12. DISPUTE
In case of any ambiguity in interpretation of the contents of this policy which shall create a dispute in
implementation, or If any difficulty arises in giving effect to provisions of the Jharkhand Electric
Vehicle Policy 2022, the same shall be referred to the Single Window Clearance Committee and
thereon the decision taken shall be final.
By the Order of the Governor of Jharkhand,
Vandana Dadel,
Principal Secretary
Department of Industry
Government of Jharkhand.
--------