THE
JHARKHAND GAZETTE
EXTRAORDINARY
PUBLISHED BY AUTHORITY
12 KARTIK 1945 (S)
RANCHI, FRIDAY 3RD NOVEMBER, 2023
JHARKHAND STATE ELECTRICITY REGULATORY
COMMISSION
--------
NOTIFICATION
31st October, 2023
Jharkhand State Electricity Regulatory Commission (Terms and Conditions for
Determination of Generation Tariff) (First Amendment) Regulations, 2023
Notification No. 92--In exercise of powers conferred by sub-section (1) of
Section 181 and clauses (zd), (ze) and (zf) of sub-section (2) of Section 181, read with
Sections 61, 62, and 86, of the Electricity Act, 2003 (36 of 2003) and all other powers
enabling it in that behalf, the Jharkhand State Electricity Regulatory Commission,
hereby makes the following amendmentsin the Jharkhand State Electricity
Regulatory Commission (Terms and Conditions for Determination of Generation
Tariff) Regulations, 2020 (hereinafter referred to as the ‘Principal Regulations’)
No. 654
Jharkhand Gazette (Extraordinary), Friday, 3rd November, 2023 2
CHAPTER-I:
SCOPE, EXTENT AND DEFINITIONS
1.
Short Title and Commencement
1.1. These Regulations may be called the Jharkhand State Electricity Regulatory
Commission (Terms and Conditions for Determination of Generation Tariff)
(First Amendment) Regulations, 2023.
1.2. These Regulations shall come into force from the date of notification of
these Regulation in the official Gazette of Government of Jharkhand.
1.3. These Regulations shall be applicable for 3rd control period (i.e., April 01,
2021 to March 31, 2026)except amendment in clause no. 22.3, and clause
no. 22.4 of the Principal regulation which shall be applicable from the date
of notification of these regulation in official Gazette unless reviewed earlier
or extended by the Commission and shall remain in force upto March 31,
2026.
1.4. These Regulations shall extend to the State of Jharkhand.
2. Scope of Regulations and Extent of Application
2.1. These Regulations shall apply in all cases where tariff for a generating
station or a Unit thereof is required to be determined by the Commission
under Section 62 of the Act read with Section 86 thereof.
2.2. These Regulations shall not apply to the following cases:
1.
Generating Stations whose tariff has been discovered through
tariffbased competitive bidding in accordance with the guidelines
issued by the Central Government and adopted by the Commission
under Section 63 of the Act;
2.
Generating Stations based on renewable sources of energy;
3. Amendment to Clause 3.1 (6)
3.1. In the Principal Regulations Clause 3.1 (6) shall be substituted as follows:
6. ‘Auxiliary Energy Consumption’ or ‘Aux’ in relation to a period in case
of a generating station means the quantum of energy consumed by
auxiliary equipment of the generating station, such as the equipment
being used for the purpose of operating plant and machinery including
switchyard of the generating station and transformer losses within the
generating station, expressed as a percentage of the sum of gross
energy generated at the generator terminals of all the Units of the
generating station:
Provided that auxiliary energy consumption shall not include energy
consumed for supply of power to housing colony and other facilities at
Jharkhand Gazette (Extraordinary), Friday, 3rd November, 2023 3
the generating station and the power consumed for construction works
at the generating station and integrated coal mine:
Provided further that auxiliary energy consumption for compliance of
revised emission standards,sewage treatment plant and external
coal handling plant (jetty and associated infrastructure) shall be
considered separately;
4.
Insertion of Clauses 3.1 (68 to 75)
4.1. In the Principal Regulations, a new Clauses 3.1 (68 to 75) shall be inserted
as follows:
68. ‘Fuel Supply Agreement’shall mean the agreement executed between
the generating company and the fuel supplier for generation and
supply of electricity to the beneficiaries;
69. ‘kCal’shall mean a unit of heat energy contents in mineral, measured
in one kilo calories or one thousand calories of heat produced at any
instantaneous period;
70. ‘Kilowatt-Hour’ or ‘kWh’shall mean a unit of electrical energy,
measured in one kilowatt or one thousand watts of power produced or
consumed over a period of one hour;
71. ‘Landed Fuel Cost’shall mean the total cost of coal (including biomass
in case of co-firing), lignite or the gas delivered at the unloading point
of the generating station and shall include the base price or input
price, washery charges wherever applicable, transportation cost
(overseas or inland or both) and handling cost, charges for third party
sampling and applicable statutory charges;
72. ‘New Project’shall mean the generating station or unit thereof
achieving its commercial operation on or after April 01, 2021;
73. ‘Quarter’shall mean the period of three months commencing on the
first day of April, July, October and January of each financial year in
case of existing project, and in case of a new project, in respect of the
first quarter, from the date of commercial operation to the last day of
June, September, December or March, as the case may be;
74. ‘Thermal Generating Station’shall mean a generating station or a
unit thereof that generates electricity using fossil fuels such as coal,
lignite, gas, liquid fuel or combination of these as its primary source of
energy or co-firing of biomass with coal;
75. ‘Unloading Point’shall mean the point within the premises of the coal
or lignite based thermal generating station where the coal or lignite is
unloaded from the rake or truck or any other mode of transport;
Jharkhand Gazette (Extraordinary), Friday, 3rd November, 2023 4
5.
Insertion of New Proviso to Clause 6.14
5.1. In the Principal Regulations a new Proviso to Clause 6.14 shall be inserted
as follows:
Provided that for generating stations that have signed coal linkage
agreement through Shakti Scheme, sharing of gains in the ratio of 75:25
between the generating stations and beneficiaries shall be applicable due to
variation in normative controllable operational parameters.
6.
Amendment to Clause 15.10
6.1. In the Principal Regulations Clause 15.10 shall be substituted as follows:
The return on equity shall be computed on post-tax basis at the base rate
of 14.50% for thermal generating stations, and run of the river hydro
generating station, and at the base rate of 15.50% for the storage type
hydro generating stations including pumped storage hydro generating
stations and run of river generating station with pondage for generating
stations whose Date of Commercial Operation is after April 01, 2021:
The return on equity shall be computed on post-tax basis at the base rate
of 15.00% for thermal generating stations, and run of the river hydro
generating station, and at the base rate of 16.00% for the storage type
hydro generating stations including pumped storage hydro generating
stations and run of river generating station with pondage for generating
stations whose Date of Commercial Operation is before April 01, 2021:
All existing Provisos shall remain in force
7.
Amendment to First Proviso of Clause 15.23
7.1. In the Principal Regulations the First Proviso of Clause 15.23 shall be
substituted as follows:
Provided that the cost of primary fuel shall be based on the landed cost
incurred (taking into account normative transit and handling losses) by the
generating station and gross calorific value of the fuel on ‘as received
basis’less 85 kCal/Kg on account of variation during storage at generating
station as per actual weighted average for three months preceding the first
month for which tariff is to be determined:
8.
Amendment to Clause 15.32
8.1. In the Principal Regulations Clause 15.32 shall be substituted as follows:
15.32. The residual value of assets shall be considered as 10% and
depreciation shall be allowed to a maximum of 90% of the original cost
of the asset. Land other than land held under lease and the land for
reservoir in case of hydro generating station shall not be
considered a depreciable asset and its cost shall be excluded while
computing the depreciable value of the asset.Land is not a
Jharkhand Gazette (Extraordinary), Friday, 3rd November, 2023 5
depreciable asset and its cost shall be excluded while computing 90%
of the original cost of the asset:
All existing Provisos shall remain in force
9.
Amendment to Clause 15.46
9.1. In the Principal Regulations Clause 15.46 shall be substituted as follows:
15.46. The Water Charges, Security Expenses and Capital Spares for
thermal generating stations shall be allowed separately after prudence
check:
Provided that Water Charges shall be allowed based on water
consumption, depending upon type of plant, type of cooling water
system, subject to prudent check. The details regarding the same shall
be furnished along with the Petition.
Provided that the generating station shall submit the details of year
wise actual capital spares consumed at the time of truing up with
appropriate justification for incurring the same and substantiating
that the same is not funded through special allowance as per Clause
14.11 and 14.12 of the Regulation or claimed as a part of additional
capitalisation or consumption of stores and spares and renovation and
modernization.
10. Amendment to Clause 16.1
10.1.
In the Principal Regulations Clause 16.1 shall be substituted as follows:
16.1. The values for operational norms for the existing generating stations
have been decided, based on the past operational data of these plants.
The norms of operation as given hereunder shall apply for existing
thermal power stations in the State:
Adhunik Power & Natural Resources Limited (APNRL) - Unit-I
Parameters
UoM
FY 21-22
FY 22-23
FY 23-24
FY 24-25
FY 25-26
Normative Annual Plant Availability
Factor
%
85.00
85.00
85.00
85.00
85.00
Normative Annual Plant Load Factor
%
85.00
85.00
85.00
85.00
85.00
Gross Station Heat Rate
kCal/kWh
2387.00
2387.00
2387.00
2387.00
2387.00
Auxiliary Consumption*
%
9.00
9.00
9.00
9.00
9.00
Secondary Fuel Oil Consumption
ml/kWh
0.50
0.50
0.50
0.50
0.50
*Note 8.5% (Normative Auxiliary Consumption) + 0.5% (For Induced draft cooling tower)
Adhunik Power & Natural Resources Limited (APNRL) - Unit-II
Parameters
UoM
FY 21-22
FY 22-23
FY 23-24
FY 24-
25
FY 25-26
Normative Annual Plant Availability
Factor
%
85.00
85.00
85.00
85.00
85.00
Normative Annual Plant Load Factor
%
85.00
85.00
85.00
85.00
85.00
Gross Station Heat Rate
kCal/kWh
2387.00
2387.00
2387.00
2387.00
2387.00
Auxiliary Consumption*
%
9.00
9.00
9.00
9.00
9.00
Secondary Fuel Oil Consumption
ml/kWh
0.50
0.50
0.50
0.50
0.50
*Note 8.5% (Normative Auxiliary Consumption) + 0.5% (For Induced draft cooling tower)
Jharkhand Gazette (Extraordinary), Friday, 3rd November, 2023 6
Inland Power Limited (IPL) - Unit-I
Parameters
UoM
FY 21-22
FY 22-23
FY 23-24
FY 24-25
FY 25-26
Normative Annual Plant Availability
Factor
%
82.50
82.50
82.50
82.50
82.50
Normative Annual Plant Load
Factor
%
82.50
82.50
82.50
82.50
82.50
Gross Station Heat Rate
kCal/kWh
2902.00
2902.00
2902.00
2902.00
2902.00
Auxiliary Consumption
%
10.50
10.50
10.50
10.50
10.50
Secondary Fuel Oil Consumption
ml/kWh
1.00
1.00
1.00
1.00
1.00
Jojobera Thermal Power Station (TPCL) - Unit-II
Parameters
UoM
FY 21-22
FY 22-23
FY 23-24
FY 24-25
FY 25-26
Normative Annual Plant Availability
Factor
%
85.00
85.00
85.00
85.00
85.00
Normative Annual Plant Load Factor
%
85.00
85.00
85.00
85.00
85.00
Gross Station Heat Rate
kCal/kWh
2567.00
2567.00
2567.00
2567.00
2567.00
Auxiliary Consumption
%
10.00
10.00
10.00
10.00
10.00
Secondary Fuel Oil Consumption
ml/kWh
0.5
0.5
0.5
0.5
0.5
Jojobera Thermal Power Station (TPCL) - Unit-III
Parameters
UoM
FY 21-22
FY 22-23
FY 23-24
FY 24-25
FY 25-26
Normative Annual Plant Availability
Factor
%
85.00
85.00
85.00
85.00
85.00
Normative Annual Plant Load Factor
%
85.00
85.00
85.00
85.00
85.00
Gross Station Heat Rate
kCal/kWh
2577.00
2577.00
2577.00
2577.00
2577.00
Auxiliary Consumption
%
10.00
10.00
10.00
10.00
10.00
Secondary Fuel Oil Consumption
ml/kWh
0.5
0.5
0.5
0.5
0.5
Tenughat Thermal Power Station (TVNL) - Unit-I
Parameters
UoM
FY 21-22
FY 22-23
FY 23-24
FY 24-25
FY 25-26
Normative Annual Plant Availability
Factor
%
85.00
85.00
85.00
85.00
85.00
Normative Annual Plant Load Factor
%
85.00
85.00
85.00
85.00
85.00
Gross Station Heat Rate
kCal/kWh
2547.00
2547.00
2547.00
2547.00
2547.00
Auxiliary Consumption
%
9.50
9.50
9.50
9.50
9.50
Secondary Fuel Oil Consumption
ml/kWh
1.00
1.00
1.00
1.00
1.00
Tenughat Thermal Power Station (TVNL) - Unit-II
Parameters
UoM
FY 21-22
FY 22-23
FY 23-24
FY 24-25
FY 25-26
Normative Annual Plant Availability
Factor
%
85.00
85.00
85.00
85.00
85.00
Normative Annual Plant Load Factor
%
85.00
85.00
85.00
85.00
85.00
Gross Station Heat Rate
kCal/kWh
2547.00
2547.00
2547.00
2547.00
2547.00
Auxiliary Consumption
%
9.50
9.50
9.50
9.50
9.50
Secondary Fuel Oil Consumption
ml/kWh
1.00
1.00
1.00
1.00
1.00
Jharkhand Gazette (Extraordinary), Friday, 3rd November, 2023 7
All existing Provisos shall remain in force
11. Amendment to Definition of CVPF (a) under Clause 17.8
11.1.
In the Principal Regulations the Definition of CVPF (a) under Clause 17.8
shall be substituted as follows:
CVPF: (a)Weighted Average Gross calorific value of coal as received, in kcal
per kg for coal based stations less 85 kCal/Kg on account of
variation during storage at generating station;
12. Amendment to Clause 22.3
12.1.
In the Principal Regulations Clause 22.3 shall be substituted as follows:
22.3. In case the payment of any bill for charges payable under these
Regulations is delayed by a Beneficiary beyond a period of 45 days
from the date of billing a late payment surcharge shall be levied by the
Generating Company at the Bank Rate as on April 01 of the respective
year plus 350 basis points.
13. Amendment to Clause 22.4
13.1.
In the Principal Regulations Clause 22.4 shall be substituted as follows:
22.4. For payment of bills of the Generating Company (Capacity Charge and
Energy Charges) within 5 days of presentation of bills by the
Generating Company, a rebate of 1.50% shall be allowed.
Note 1: In case of computation of 5 days, the number of days shall be
counted consecutively without considering any holiday. However, in
case the last day or 5th day is official holiday, the 5thday for the
purpose of Rebate shall be construed as the immediate succeeding
working day (as per the official State Government’s calendar, where
the Office of the Authorized Signatory or Representative of the
Beneficiary, for the purpose of receipt or acknowledgement of Bill is
situated).
Note 2: As per example if a bill is issued on the 1st day of any month,
the 5 days will be counted from the 2nd day of the month, i.e. the 6th
day of the month will be the end date for availing the rebate.
--------
Printed & Published by the Superintendent of Jharkhand Government Press, Doranda, Ranchi.
Jharkhand Gazette (Extraordinary) 654 -- 50.
By Order of the
Commission.
Rajendra Prasad Nayak,
Secretary