THE
JHARKHAND GAZETTE
EXTRAORDINARY
PUBLISHED BY AUTHORITY
23 AGRAHAYAN 1945 (S)
RANCHI, THURSDAY 14th DECEMBER, 2023
JHARKHAND STATE ELECTRICITY REGULATORY
COMMISSION, RANCHI
--------
NOTIFICATION
22nd November, 2023
Jharkhand State Electricity Regulatory Commission (Utilization of Surplus
Capacity of Captive Power Plants based on Conventional Fuel) Regulation, 2023
Notification No.95--In exercise of the powers conferred by Sub-Section (b) of
Section 86 of the Electricity Act 2003 (36 of 2003) and all powers enabling it on that
behalf, the Jharkhand State Electricity Regulatory Commission hereby makes the
following Regulations, to harness the surplus generation capacity of captive power
units and to reduce peak time shortages in the system.
1.
Short Title, Commencement and Interpretation
1.1.
These Regulations shall be called the Jharkhand State Electricity
Regulatory Commission (Utilization of Surplus Capacity of Captive Power
Plants based on Conventional Fuel) Regulations, 2023.
1.2.
These Regulations shall apply to all the Captive Power Plants using
conventional fuels in the State of Jharkhand.
No. 739
Jharkhand Gazette (Extraordinary), Thursday, 14th December, 2023
2
1.3.
These Regulations shall come in to force on the date of its publication in
the Jharkhand Gazette.
2.
Definitions
2.1.
In these Regulations, unless the contex to therwi sere quires:
a)
‘ABT’ shall mean Availability Based Tariff;
b)
‘Act’ shall mean the Electricity Act, 2003 and subsequent
amendments thereof;
c)
‘Banking’ shall mean the facility by which unutilized surplus power
is supplied by the Captive Power Plant (CPP) to the grid, not with the
intention of selling it, but with the intention of exercising its
eligibility to draw back this power from the grid at a later stage on
payment of banking charges and as per other terms and conditions
as specified by the Commission from time to time;
d)
‘Billing cycle’ shall mean a period of one month commencing from
00:00 hours on the first day of the month and ending at 24:00
hours on last day of the month;
e)
‘Captive Power Plant (CPP)’ shall have the same meaning assigned
in electricity rule 2005 and amended from time to time;
f)
‘Captive User(s)’ shall have the same meaning assigned in
electricity rule 2005 and amended from time to time;
g)
‘Company’ shall mean a company formed and registered under the
Companies Act, 1956 and includes anybody corporate under a
Central, State or Provincial Act;
h)
‘Commission’ or‘ JSERC’ shall mean the Jharkhand State
Electricity Regulatory Commission;
i)
‘Conventional Fuel’ shall mean any of the fossil fuels such as coal,
lignite etc;
j)
‘Day’ shall mean a continuous period of 24 hours;
k)
‘Firm Power’ shall mean the power agreed for supply by a CPP to a
Distribution Licensee in the Power Purchase Agreement executed
between the Distribution Licensee and the CPP. The variation up to
plus or minus 10% from the agreed capacity shall be treated as firm
power;
l)
‘Firm Energy’ shall mean energy corresponding to Firm Power;
m)
‘Grid Code’ shall mean the JSERC (State Grid Code) Regulations,
2008, and the CERC(Indian Electricity Grid Code) Regulations,
2023, as amended from time to time;
Jharkhand Gazette (Extraordinary), Thursday, 14th December, 2023
3
n)
‘Infirm Power’ shall mean the power supplied by a CPP to a
Distribution Licensee if it is less than 90% or more than 110% of the
Firm Power as defined above;
o)
‘Infirm Energy’ shall mean energy corresponding to In-firm Power;
p)
‘Licensee’ shall mean a person who has been granted a licence
under section 14 of the Act;
q)
‘Open Access Regulation’ shall mean the JSERC (Terms and
Conditions for Intra State Open Access) Regulations, 2016, as
amended from time to time;
r)
‘Stand-by contract demand’ shall mean the maximum demand in
Mega Watt (MW) contracted by the CPP under Standby support with
the Distribution Licensee of its area of supply;
s)
‘Stand-by period’ shall mean a period worked out by the Licensee
as per the procedure for requisitioning Stand-by support as
provided in these Regulations;
t)
‘Stand-by support’ shall mean the contractual arrangement
between the CPP user and the Distribution Licensee of his area of
supply to provide power in case of planned or forced outage of the
CPP. The nature of outage may be ‘partial’ (outage of one or more
units but not all units) or ‘full’ (outage of all units);
u)
‘SLDC’ shall mean the State Load Dispatch Centre (established
under subsection (1) of section 31 of the Act) to ensure integrated
operations of the power system and coordinating supply-demand in
the state in real- time;
v)
‘TYPEACPP’ shall mean CPP which is not connected to the grid;
Interconnecting breaker on the grid end shall be kept open, and
shall be charged by the Licensee only when the notification of
requirement of Stand-by support is required by the Captive User;
w)
‘TYPE B CPP’ shall mean CPP which is located within the premises
of the captive user and connected to grid;
x)
‘TYPE C CPP’ shall mean CPP which is located at premises other
than that of the captive user;
y)
‘Year’ or ‘Financial Year’ shall mean a period commencing on April
01 of a calendar year and ending on March 31 of the subsequent
calendar year;
2.2.
All other expressions used herein although not specifically defined
herein, but defined in the Act, shall have the meaning assigned to them
in the Act. The other expressions used herein but not specifically defined
in this Regulations, JSERC (Terms and Conditions for Intra State Open
Jharkhand Gazette (Extraordinary), Thursday, 14th December, 2023
4
Access) Regulations, 2016, JSERC (State Grid Code) Regulations, 2008
and amendments thereof or in the Electricity Act, 2003 and amendments
thereof but defined under any law passed by the parliament applicable to
electricity industry in the State or stated in the tariff order shall have the
meaning assigned to them in such law. Subject to the above the
expression used herein but not specifically defined in this regulation or
the regulation in the Act or any law passed by the parliament shall have
the meaning as is generally assigned in the electricity industry.
3.
Grid Interconnection/ Parallel Operation
3.1.
The CPP and dedicated transmission/distribution lines and substations
shall be established, operated and maintained, as per the technical,
safety
and
grid
standards
specified
by
the
Transmission
Licensee/Distribution Licensee or the Commission as the case maybe.
3.2.
As per section 9 of the Act, the supply of electricity from a CPP through
the grid shall be regulated in the same manner as the generating station
of a generating company. For this purpose, the CPP shall comply with the
directions issued by the SLDC and/or the distribution licensee for
exercising supervision and control as may be necessary for ensuring
integrated grid operations and for achieving the maximum safety,
economy and efficiency in the operation of power system in the state.
Provided that if any dispute arises with reference to the quality of
electricity or safe, secure and integrated operation of the State grid or in
relation to any direction issued by SLDC and/or the distribution
licensee, it shall be referred to the Commission for the decision. However,
pending the decision of the Commission, the CPP shall comply with the
directions issued by the SLDC/ Licensee, as the case may be.
3.3.
The CPP, shall have the right to open access for the purposes of carrying
electricity from its captive generating plant to the destination of its use
subject to availability of adequate transmission and/or distribution
facility determined by the State Transmission Utility or the Distribution
Licensee, as the case may be.
3.4.
A CPP, in accordance with provisions of Section 9 of the Act, may sell
surplus power, after consuming not less than 51% of the aggregate
electricity generated in such plant determined on annual basis as
prescribed in Rule 3 of the Electricity Rules, 2005 to a Distribution
Licensee as per the provisions of the Act, Rules & these regulations and
to any consumer in accordance with the provisions of the JSERC (Terms
and Conditions for Intra State Open Access) Regulations, 2016, as
amended from time to time.
3.5.
CPP, connected with the grid, shall ensure compliance of the State Grid
Code, Indian Electricity Grid Code and the Regulations issued by the
Central Electricity Authority, amended from time to time, and any other
direction of SLDC issued from time to time for ensuring integrated grid
operation and for achieving the maximum economy of the operation of
power system.
Jharkhand Gazette (Extraordinary), Thursday, 14th December, 2023
5
3.6.
A CPP intending to supply electricity to a Distribution Licensee will bear
all the cost of power evacuation facility including the switch yard and
interconnection facilities up to the point of injection into the substation
including cost of bay/breaker of the Licensee’s substation.
3.7.
The connectivity to the system network shall be provided by the Licensee
only after the CPP completes all the formalities as prescribed by the
Licensee with respect to seeking connection of the CPP to the grid. The
CPP shall also be required to maintain the statutory clearances
throughout the term of connectivity with the grid.
3.8.
The CPP shall provide the infrastructure for connecting the generating
plant (if not existing earlier) to the network of the Transmission
Licensee/Distribution Licensee as the case may be.
3.9.
In case the CPP requires the Transmission Licensee/Distribution
Licensee to build the in frastructure to connect the CPP with the
Licensee’s network then the CPP shall have to bear the cost as per the
applicable rates for extending network facility.
3.10. The voltage level for interconnection with the grid shall be the voltage
level specified for different loads/contract demand for supply to the
consumers in accordance with the provisions of the JSERC (Electricity
Supply Code) Regulations, 2015, as amended from time to time, subject
to technical feasibility.
Provided that where it is technically more suitable to give connectivity at
voltage other than that specified in the referred Regulations, Distribution
Licensee may provide the connectivity at other voltage level with the
consent of Captive Generator.
3.11. The scheme of synchronizing the CPP with the concerned Licensee’s
network
shall
have
to
be
approved
by
the
Transmission
Licensee/Distribution Licensee as the case may be.
3.12. A CPP, which is an obligated entity under the JSERC (Renewable Energy
Purchase Obligation and its compliance) Regulations, 2016, as amended
from time to time, shall ensure compliance of the said Regulations.
4.
Conditions for Sale and Purchase of Power
4.1.
Any CPP with an installed capacity of 1 MW and above and willing to sell
the surplus power to a Licensee within the state shall be required to
enter into a Captive Power Plant (CPP) Agreement with the Licensee. The
Licensee shall prepare and submit to the Commission a CPP Agreement
to be signed with the CPP, for the Commission’s approval.
4.2.
The CPP Agreement shall entail all details such as Sale of Power,
Metering & Energy Billing, Scheduling, Balancing and Settlement, Stand-
By Support, Banking Arrangements and other conditions as specified in
these Regulations.
Jharkhand Gazette (Extraordinary), Thursday, 14th December, 2023
6
4.3.
All existing CPP Agreements shall be superseded with the applicability of
these Regulations.
4.4.
Licensee within the state shall have the first right of refusal in cases
where a CPP with an installed capacity of 1 MW and above is willing to
sell the surplus power outside the state.
Provided if Licensee within the state fails to enter into a Captive Power
Plant (CPP) Agreement within 60 days of invoking the first right of
refusal, the CPP will be free to sell its surplus power anywhere.
4.5.
The maximum rate of purchase of power from a CPP by the Licensee
shall be as per the approach specified in clause 4.8 of these regulations.
However, the concerned Distribution Licensee shall have the option of
procuring short-term/long-term power from any CPP based on
competitive bidding, in terms of the guide lines by the Ministry of Power,
Government of India in this regard.
4.6.
The energy for each time block of 15 minutes equivalent to the Firm
Power declared in the Power Purchase Agreement shall be calculated as
under:
ܨܧ= (ܦ ݔ 1000)/4
Where,
FE= Firm energy(in kWh)
D= Firm Power (in MW)
4.7.
The rate for the purchase of Firm Power from the CPP shall be
differentiated between the power purchased during peak-hours and off-
peak hours. For this purpose, peak-hours will be the period between
06:00 hours to 10:00 hours and 18:00 hours to 22:00 hours on any day,
and the remaining period will be considered as off-peak hours.
4.8.
The maximum rate of purchase of Firm Power during peak hours shall
betaken as the weighted average power purchase costs of the Licensee
(excluding liquid fuel based generation, generation from renewable
sources and power drawn from Unscheduled Interchange) as approved by
the Commission in the applicable Tariff Order.
4.9.
Power injected by the CPP during off-peak hours shall be paid for at rate
of upto 85% of the power purchased rate during peak hours.
4.10. The rate of purchase of In-firm Power shall be 80% of the rate specified
for Firm Power, for both peak hours and off-peak hours.
4.11. For a grid connected CPP that requires drawal of power at regular basis,
the drawal up to contract demand shall be billed at retail supply tariff
(HT Industrial tariff) and the drawal beyond contract demand shall be
deemed as Stand-By Support.
Jharkhand Gazette (Extraordinary), Thursday, 14th December, 2023
7
5.
Metering & Energy Billing
5.1.
The point for measuring the energy delivered shall be the interface point
of the CPP and the Distribution Licensee or Transmission Licensee, as
the case may be. All losses from the interface point shall be borne by the
Licensee in case power is being purchased by the licensee.
5.2.
All CPPs desirous of selling power to either Distribution Licensee or Third
party or seeking Stand-by support from the Licensee shall have to install
at their premises, ABT compliant main and check special energy meters
capable of energy accounting for each block of 15 minutes at the
generation end and at the interface point.
5.3.
Responsibility of meter reading, energy accounting and settlement of
charges at the CPP interface point shall be with the concerned Licensee
or as per the provisions of the Power Purchase Agreement between the
Licensee and the CPP.
5.4.
The Invoice for power purchased by a Licensee shall be raised by the CPP
based on the meter readings at the interface point within a period of 1
week from the date of meter reading. The concerned Licensee shall be
responsible for making payment against the invoice, at the most, within
the same period as provided by it to recover payments from the HT
consumers. The exact terms of duration of payment shall be defined in
the Power Purchase Agreement.
5.5.
The CPP shall also have the option to receive payment through a
revolving Letter of Credit of a value equal to 1/12th of the total amount
billed in the previous financial year in favour of the CPP. For a new CPP,
it would be 1/12th of the amount for energy proposed to be supplied in
the current financial year. The cost of opening and maintaining the Letter
of Credit shall be borne by the CPP.
5.6.
For payment of bills of capacity charges and energy charges through the
Letter of Credit a rebate of 2.0% of the billed amount shall be provided by
the CPP to the Licensee. If the payments for the bills of capacity and
energy charges are made by a mode other than through the Letter of
Credit but within a period of one month of presentation of bills by CPP, a
rebate of 1.0% of the billed amount shall be provided by the CPP to the
Licensee.
5.7.
In case the payment of bills of capacity and energy charges by the
Licensee is delayed beyond a period of one month from the date of billing
a late payment surcharge as may be determined by the Commission from
time to time shall be payable by the Licensee.
6.
Scheduling, Balancing and Settlement
6.1.
The CPPs shall be required to provide the injection and drawal schedules
as per ‘PART E: SCHEDULING & DESPATCH CODE’ of the JSERC
(State Grid Code) Regulations, 2008 and its amendments thereof.
Jharkhand Gazette (Extraordinary), Thursday, 14th December, 2023
8
Provided that advanced machine learning driven power portfolio
management operating software may be used for implementation of
optimum generation schedules.
6.2.
All payments for Firm energy and In-firm energy shall be done as per the
following methodology:
a)
Step-1: Energy, for each time-block of 15-minutes, recorded by the
export/import energy meter installed at the interface point of CPP
and the Licensee, equivalent to Firm Power in MW declared in the
Power Purchase Agreement, shall be worked out as per clause 4.6 of
these regulations.
b)
Step-2: At the end of a billing cycle, the data downloaded from the
inter face meters shall be used to compute actual energy generate
don a 15- minute time-block-wise basis. The actual energy delivered
to the Licensee shall be determined after deducting any third party
sales and energy supplied to own consumers, if any, from the total
net exported energy as recorded at the CPP premises.
c)
Step-3: Payment settlement for Firm energy and In-firm energy shall
be done at the end of the billing cycle for energy injected on a 15-
minute basis. The data downloaded from the interface meters
representing actual export/import shall be compared with the
injection schedule for each correspondingtimeblockof15 minute
sand payment shall be made onthe following basis:
Condition
Payment
If
actual
energy
injected is more than
the Firm energy
As long as actual energy injected is less than or equal to
110% of declared Firm energy, the payment of all energy
injected shall be at rates applicable for Firm Power for the
particular period of time.
In case actual energy injected is greater than 110% of
declared Firm energy, the payment for all energy injected shall
be at rates applicable for In-firm Power for the particular
period of time.
If
actual
energy
injected is equal to
the Firm energy
All actual energy injected shall be paid at the rates applicable
for Firm Power for the particular period of time
If
actual
energy
injected is less than
the Firm energy
As long as actual energy injected is greater than or equal to
90% of declared Firm energy, the payment of all energy
injected shall be at rates applicable for the Firm Power for the
particular period of time.
In case actual energy injected is less than 90% of declared
Firm energy, the payment for all energy injected shall be at
rates applicable for In-firm Power for the particular period of
time.
Jharkhand Gazette (Extraordinary), Thursday, 14th December, 2023
9
d)
In cases where in the Licensee is unable to schedule the power as
contracted in the Power Purchase Agreement with the CPP, due to
system constraint/low power demand, the calculation for the Firm
energy shall be done on the basis of the restricted schedule given by
the Licensee.
7.
Stand-By Support
7.1.
The Stand-by support shall be provided to the following type of Captive
Users:
a)
Where the Captive User and his CPP are located within the same
premises but the CPP is not connected to the grid at all; and
b)
Captive Users whose CPP is connected with the grid, but the Captive
User does not have any other supply contract, other than a Contract
Demand with the Distribution Licensee of Captive User’s area of
supply.
7.2.
The applicability of Stand-by support to the different types of Captive
Power Plants shall be as under:
Type
Description
Additional
powersupply
arrangements of CPP
Stand-by support
A
CPP
is
not
connected to grid
No
other
power
supply
arrangement except own CPP
Allowed
B
CPP
is
located
within
the
premises of the
captive user and
connected to grid
From Distribution Licensee only
Allowed
C
CPP is located at
premises
other
than that of the
captive user
From Distribution Licensee only
Allowed
as
per
the
provisions
of
the
JSERC
(Balancing
&
Settlement
Mechanism for Open Access)
Regulations, 2010
7.3.
The Licensee shall be compulsorily obliged to provide facility of Stand-by
support to the CPP identified in the table above. The Stand-by support
sought by the user shall not exceed the contracted stand-by demand.
7.4.
In case the Licensee is not in a position to supply the Stand-by contract
demand on the request of CPP, which has contracted Stand-by demand
with the Licensee on terms and conditions as provided in these
Regulations, the Licensee shall pay to the Captive User by way of penalty
at two times the fixed charges as prescribed in clause 7.9 and clause
7.18 of these Regulations for the period of supply is unavailable.
However, either party shall not be liable for any claim for loss/ damage
or compensation whatsoever arising out of failure of supply when such
failure of supply is due to, either directly or indirectly, to major
breakdown of captive power plant due to technical reasons i.e.,
Jharkhand Gazette (Extraordinary), Thursday, 14th December, 2023
10
breakdown of Turbine or Alternator or Force Majure conditions such as
war, mutiny, Civil commotion, riot, terrorist attack, fire, flood, strike
(subject to certification by Labour Commissioner), lock out (subject to
certification by Labour Commissioner) cyclone, lightening, earthquake or
act of God. However, if such event occurs, then the period of
discountinuance shall be added to the said period of the stand-by
agreement.
TYPEA
7.5.
This type of CPP shall be connected to the grid as per clause 3.8 to
clause 3.10 of these regulations. The interconnecting breaker on the grid
end shall be kept open, and shall be charged by the Licensee only when
the notification of requirement of Stand-by support is required by the
Captive User.
7.6.
The CPP vide notification shall intimate the Licensee regarding the
portion of stand-by demand, the CPP intends to avail as against the total
stand-by contracted demand, for daily scheduling purposes, to the
Licensee.
7.7.
The total period for the purpose of billing for Stand-by support shall be
from the time the Licensee intimates the Captive User regarding the
availability of Stand-by support, after receipt of request for Stand-by
support from the CPP, up to the time the CPP intimates the Licensee that
Stand-by support is no longer required.
Applicable Charges
7.8.
The maximum demand that can be contracted under Stand-by support
by such Captive Users shall not be more than the total rated capacity of
CPPs classified generating units.
Provided maximum demand contracted under Stand-by support shall be
supplied by the Licensee only when the generation from all units of CPP
seizes.
7.9.
Wherever an agreement for Stand-by support exists between the Captive
User and the Licensee, the Captive User shall be required to pay to the
Licensee a fixed charge of Rs. 70 per k VA per month, applicable on the
capacity contracted under Stand-by support with the Distribution
Licensee.
Provided that the charges referred to above shall apply uniformly every
month, irrespective of whether the Captive User Avails Stand-by support
or not.
7.10. In addition to the charges mentioned in clause 7.9 of these regulations,
the Captive User shall also be required to bear energy and demand
charges for the power consumed during period of Stand-by support as
under:
Jharkhand Gazette (Extraordinary), Thursday, 14th December, 2023
11
Particulars
Applicable Charges
Stand-by
supportavailedfor1008hours(42
days) in a financial year
Pro-rated HT Industrial Consumer Contract Demand tariff
at corresponding voltage and demand (or as per the order
of the Commission as specified from time to time)for Stand-
by contracted Demand. The pro-rata shall be done on the
basis of the usage.
1.5 times of the HT Industrial Consumer Energy charges at
corresponding voltage and demand (or as per the order of
the Commission as specified from time to time) for energy
equivalent to Stand-by Demand.
Stand-by support availed for
greater than 1008 hours (42
days) in a financial year
Upto 1008 hours:
Pro-rated HT Industrial Consumer Contract Demand tariff
at corresponding voltage and demand (or as per the order
of the Commission as specified from time to time) for
Stand-by contracted Demand. The pro-rata shall be done
on the basis of the usage.
1.5 times of the HT Industrial Consumer Energy charges at
corresponding voltage and demand (or as per the order of
the Commission as specified from time to time) for energy
equivalent to Stand-by Demand.
Beyond 1008 hours:
Tariff approved by the Commission for temporary HT
consumers at corresponding voltage and demand (or as per
the order of the Commission as specified from time to time)
in the Licensee’s area of supply on power consumed beyond
1008 hours.
7.11. The demand charges shall be applied on the maximum demand at any
15 minutes time block covered under Stand-by period subject to
minimum of 90% of the contract demand. The Stand-by period for this
purpose shall be reckoned maximum up to 1008 hours (42 days) in any
financial year. The energy charges shall be applied on the total energy
consumed across all time-blocks covered under the Stand-by period.
7.12. In case the recorded maximum demand at the CPP premises exceeds the
stand-by contract demand, the excess demand recorded shall be billed at
2 times (twice) the demand charges arrived at from clause 7.11of these
Regulations.
TYPEB
7.13. The CPP shall notify the Licensee of his area of supply about the
requirement of Stand-by support at least two(2)days in advance, except in
case of major breakdown, before the time the Captive User in tends to
avail power from the Licensee.
Jharkhand Gazette (Extraordinary), Thursday, 14th December, 2023
12
Provided that incase of force majeure condition, major breakdown of
captive power plant due to technical reasons (i.e. breakdown of Turbine
or Alternator), the requirement of Stand-by support must be notified to
the Licensee immediately.
Provided that incase of force majeure condition, the requirement of
Stand-by support must be notified to the Licensee immediately.
7.14. The CPP shall provide the Licensee the schedule of date and time with
respect to maintenance of Captive Power Plant.
7.15. When the Captive User CPP start refunctioning, the Captive User within
a period of 1 hour, shall notify the Licensee giving the details of the date
and time of the refunctioning of the CPP. The total period of Stand-by
support shall be worked out accordingly.
7.16. The CPP vide notification shall intimate the Licensee regarding the
portion of stand-by demand the CPP intends to avail as against the total
stand-by contracted demand, for daily scheduling purposes, by the
Licensee.
Applicable Charges
7.17. The maximum demand that can be contracted under Stand-by support
by such Captive Users shall not be more than the total rated capacity of
all the generating units of the Captive User’s CPP.
Provided maximum demand contracted under Stand-by support shall be
supplied by the Licensee only when the generation from all units of CPP
is seizes.
7.18. Wherever an agreement for Stand-by support exists between the Captive
User and the Licensee of his area of supply, the Captive User shall be
required to pay to the Licensee a fixed charge of Rs. 70 per k VA per
month, applied on the capacity contracted under Stand-by support with
the Licensee.
Provided that the charges referred to above shall apply uniformly every
month, irrespective of whether the user avails Stand-by support or not.
7.19. In addition to charges mentioned in clause 7.18of these regulations, the
Captive Users shall also be required to bear energy charges and demand
charges for the power consumed during period of Stand-by support
shown as under:
Jharkhand Gazette (Extraordinary), Thursday, 14th December, 2023
13
Particulars
Applicable Charges
Stand-by
period
applicable
in
the
month or part of
month
Normal Demand Charges as approved by the Commission in the
Tariff Order, on Contract Demand, irrespective of actual recorded
demand at premises.
Pro-rated HT Industrial Consumer Contract Demand tariff at
corresponding voltage and demand (or as per the order of the
Commission as specified from time to time) for Stand-by Demand
contracted (applicable only for the time blocks covered under
stand-by period), irrespective of actual Recorded Demand at the
premises.
1.5 times of the HT Industrial Consumer Energy charges at
corresponding voltage and demand (or as per the order of the
Commission as specified from time to time) for energy equivalent
to Stand-by Demand.
7.20. The total duration of all Stand-by periods with respect to any Captive
User during any financial year shall be limited to 1008 hours (42 days) in
any financial year. As long as the Stand-by period is within these limits,
the charges specified in clause 7.19 of these regulations shall apply and
thereafter, if the failure or shutdown of the CPP still continues, any
power consumed by the Captive User shall be charged at tariff approved
by the Commission for temporary HT consumers at corresponding
voltage and demand (or as per the order of the Commission as specified
from time to time) in the Licensee’s area of supply.
Provided that incase of major breakdown of captive power plant due to
technical reasons i.e., breakdown of Turbine or Alternator, upon
notification to the distribution licensee, the requirement of Stand-by
support may be extended beyond 1008 hours (42 days) in the financial
year, and shall be limited to 1440 hours (60 days) in any financial year. If
the failure or shutdown of the CPP still continues, any power consumed
by the Captive User shall be charged at tariff approved by the
Commission for temporary HT consumers at corresponding voltage and
demand (or as per the order of the Commission as specified from time to
time) in the Licensee’s area of supply.
7.21. The demand charges shall be applied on the maximum demand at any
15-minute time block covered under Stand-by period subject to
minimum of 90% of the contract demand. The Stand-by period for this
purpose shall be reckoned maximum up to 1008 hours (42 days). The
energy charges shall be applied on the total energy consumed across all
time-blocks covered under the Stand-by period.
7.22. In case the recorded maximum demand at the CPP premises exceeds the
stand-by contract demand, the excess demand recorded shall be billed at
2 times (twice) the demand charges arrived at from clause 7.21 of these
regulations.
Jharkhand Gazette (Extraordinary), Thursday, 14th December, 2023
14
TYPEC
7.23. The facility for Stand-by support shall be available for such Captive
Users as per the JSERC (Balancing & Settlement Mechanism for Open
Access) Regulations, 2010. The Commission shall notify the conditions
and charges for requisitioning stand by support by such Captive Users
along with the balancing and settlement mechanism.
8.
Banking Arrangements
8.1.
The banking of electricity shall be the process under which the CPP shall
supply power to the grid, not with the intention of selling it, but with the
intention of exercising its eligibility to draw back this power from the grid
at a later stage.
8.2.
Banking of energy up to 100% shall be allowed throughout the financial
year on payment of banking charges, subject to technical feasibility of
evacuation.
8.3.
The period of non-banking for up to 2 months in a financial year shall be
mutually agreed upon in the CPP Agreement signed between the CPP and
the Licensee.
8.4.
The maximum MW for injection during banking and Maximum MW for
drawal, both shall be discussed and agreed between the Distribution
Company and Captive Generators based on technical limits and Planned
Power Sources of the Distribution Company.
8.5.
The banking charges shall be 10% of the energy banked for the firm
power and 20%of the energy banked for the infirm power by the CPP with
the Licensee.
8.6.
The withdrawal of banked energy shall be allowed on a slot to slot basis
during the financial year only as per the following system,
a)
Peak hour banking with peak hour withdrawal;
b)
Peak hour banking with Off peak hour withdrawal; and
c)
Off peak hour banking with Off peak hour withdrawal;
Provided that the withdrawal of power in peak hours shall not be allowed
against power banked in Off peak hours.
Provided further that the quantum of withdrawal of banked power shall
not be more than the power banked as per the slot to slot system or as
per mutual consent of the parties.
8.7.
The banked energy shall not be permitted to be carried forward to
subsequent financial year and shall be adjusted during the same
financial year.
Jharkhand Gazette (Extraordinary), Thursday, 14th December, 2023
15
8.8.
The unutilized surplus banked energy at the end of the financial year
shall be treated as sold to the Licensee at 65% of the weighted average
power purchase costs of the Licensee (excluding liquid fuel based
generation, generation from renewable sources and power drawn from
Unscheduled Interchange) as determined by the Commission in the
applicable Tariff Order. However, banking charges shall be deducted from
such unutilized banked energy.
Provided that for the rates determined as per clause 4.8 of the
regulations, the rate at which such unutilized banked energy is sold to
the Licensee shall be separately defined for peak and off peak hours of
generation.
8.9.
The energy account of all banking transactions shall be maintained by
SLDC.
9.
Dispute Resolution
9.1.
All disputes and complaints shall be referred to the Commission for
resolution, which shall decide the dispute after giving an opportunity of
hearing to the parties. The decisions of the Commission shall be binding
on all parties.
10. Inherent powers of the Commission
10.1. Nothing in these Regulations shall be deemed to limit or otherwise affect
the power of the Commission to make such orders as may be necessary
to meet the ends of justice.
10.2. Nothing in these Regulations shall bar the Commission from adopting in
conformity with provisions of the Act, a procedure which is at variance
with any of the provisions of these Regulations, if the Commission, on
considering the special circumstances of a matter or a class of matters,
deems it just or expedient for deciding such matter or class of matters.
10.3. Nothing in these Regulations shall, expressly or implied, bar the
Commission from dealing with any matter or exercising any power under
the Act for which no Regulations have been framed, and the Commission
may deal with such matters, powers, and functions in a manner, as it
considers just and proper.
11. Power to Relax
11.1. The Commission may by general or specific order, for reasons to be
recorded in writing, and after giving an opportunity of hearing to the
parties likely to be affected, may relax any of the provisions of these
Regulations on its own motion or on an application made before it by the
affected party.
Jharkhand Gazette (Extraordinary), Thursday, 14th December, 2023
16
12. Power to Remove Difficulties
12.1. If any difficulty arises in giving effect to the provisions of these
Regulations, the Commission may, by general or specific order, give
directions, in accordance with the provisions of the Act, as may appear to
be necessary or expedient for the purpose of removing difficulties, after
giving opportunities of hearing the parties.
13. Power to amend
13.1. The Commission may from time to time add, vary, alter, modify or amend
any provisions of these Regulations after following the necessary
procedures.
14. Interpretation
14.1. The decision of the Commission regarding the interpretation of these
Regulations shall be final and binding.
--------
Printed & Published by the Superintendent of Jharkhand Government Press, Doranda, Ranchi.
Jharkhand Gazette (Extraordinary) 739 -- 50.
By order of the Commission,
Rajendra Prasad Nayak,
Secretary