THE
JHARKHAND GAZETTE
EXTRAORDINARY
PUBLISHED BY AUTHORITY
25 FALGUN 1945 (S)
RANCHI, FRIDAY 15th MARCH, 2024
JHARKHAND STATE ELECTRICITY REGULATORY
COMMISSION
--------
NOTIFICATION
15th March, 2024
JSERC (Electricity Supply Code) (Second Amendment) Regulations, 2024
Notification No.-97--In exercise of power conferred by Clause(x) of sub-section
(2) of Section 181 read with Section 50 of the Electricity Act 2003(36 of 2003) and
all
power
enabling
it
in
that
behalf,
the
Jharkhand
State
Electricity
Regulatory Commission hereby makes the second amendment in Jharkhand State
Electricity Regulatory Commission (Electricity Supply Code), Regulations,2015
(hereinafter referred to as the ‘Principal Regulations’).
These Regulation have been amended as per the notification issued by Ministry of
Power and published in Gazette of Indiavide notification No. G.S.R.818 (E) dated
31st December 2020, G.S.R. 125(E) dated February 22, 2024, Electricity
(Right of Consumers) Amendment rules 2020.
1. Short Title and Commencement
1.1.
These Regulations may be called the JSERC (Electricity Supply Code)
(Second Amendment) Regulations, 2024.
No. 157
Jharkhand Gazette (Extraordinary), Friday, 15th March, 2024
2
1.2.
These Regulations shall extend to the State of Jharkhand.
1.3.
These Regulations shall come into force from April 01, 2024 after its
publication in the official gazetteof the Government of Jharkhand unless
reviewed earlier or extended by the Commission.
1. Insertion of sub-clause 5.2.5 under clause 5.2 in Chapter A5-Requisition
for Supply
5.2.5 For electrified areas up to 150 kW, the connection charges for new
connection shall be fixed on the basis of the load, category of connection
sought and average cost of connection of the distribution licensee so as
to avoid site inspection and estimation of demand charges for each and
every case individually. The demand charges, in such cases, may be paid
at the time of application for new connection.
2. Amendment in clause 6.26 under Chapter A6-Procedure for providing
fresh electricity connection
In the Principal Regulations, under chapter A6clause 6.26 shall be
substituted with new proviso as below:
The time period after submission of application complete in all aspects
shall not exceed three days in metropolitan area, seven days in other
municipal area and fifteen days in rural areas, within which the
distribution licensee shall provide new connection or modify an existing
connection.
Provided that for rural areas of state, the maximum time period for new
connection or modification of an existing connection, after submission of
application in all aspects, shall not exceed thirty days.
Provided further that where such supply requires extension of
distribution mains or commissioning of new substations, the distribution
licensee shall supply the electricity to such premises immediately after
such extension or commissioning within a period not exceeding ninety
days.
3. Insertion of sub-clause (g) and (h) under clause 10.1.1 under Chapter A10-
Billing
(g) Easy to understand bills.
(h) Bills should also be issued in local language along with English.
By Order of the Commission,
Rajendra Prasad Nayak,
Secretary
----------
Printed & Published by the Superintendent of Jharkhand Government Press, Doranda, Ranchi.
Jharkhand Gazette (Extraordinary) 157 -- 50.