THE
JHARKHAND GAZETTE
EXTRAORDINARY
PUBLISHED BY AUTHORITY
23 JYESTH 1946 (S)
RANCHI, THURSDAY 13th JUNE, 2024
JHARKHAND STATE ELECTRICITY REGULATORY COMMISSION,
RANCHI
JSERC (Rooftop Solar PV Grid Interactive System and Net/Gross Metering)
(Fourth Amendment) Regulations, 2024
--------
NOTIFICATION
29th May, 2024
Notification no.102--In order to promote generation of Renewable Energy in the
state of Jharkhand, the Commission in exercise of powers conferred upon it under
Section 181(1), read with Sections 61 (h), and 86(1)(a), (b) and (e) of the Electricity
Act, 2003 (36 of 2003) and all other powers enabling it in that behalf, the Jharkhand
State Electricity Regulatory Commission hereby makes the following Regulations to
amend the JSERC (Rooftop Solar PV Grid Interactive System and Net/Gross
Metering) Regulation, 2015 (hereinafter referred to as the ‘Principal Regulations’).
1. Short Title and Commencement
1.1.
These Regulations may be called the JSERC(Rooftop Solar PV Grid Interactive
System and Net/Gross Metering) (Fourth Amendment) Regulations, 2024.
1.2.
These Regulations shall extend to the State of Jharkhand.
1.3.
These Regulations shall come into force from the date of their publication in
the Jharkhand State Government Gazette unless reviewed earlier or extended
by the Commission.
No. 391
Jharkhand Gazette (Extraordinary), Thursday, 13th June, 2024
2
2. Amendment to Regulation A7
In the Principal Regulations, under chapter A7in clause 7.3a new proviso shall be
inserted as below:
7.3 In order of priority, the Distribution Licensee shall complete the feasibility analysis for
connecting the rooftop solar PV system to the distribution system within fifteen (15) days
from the date of receipt of the application. The feasibility shall be valid for a period of one
month unless extended by the Distribution Licensee. Provided that if the Distribution
Licensee determines that an interconnection study is necessary, the Distribution Licensee
shall intimate feasibility or otherwise within thirty (30) days from the receipt of the
completed application.
Provided that the applications for roof top solar photo voltaic systems upto 10 kW
capacity, complete in all respects shall be deemed to have been accepted without
requiring technical feasibility study and any commensurate enhancement of the
sanctioned load of the consumer, as may be required, shall be carried out by the
distribution licensee.
By Order of the Commission,
R.P.Nayak,
Secretary
----------
Printed & Published by the Superintendent of Jharkhand Government Press, Doranda, Ranchi.
Jharkhand Gazette (Extraordinary) 391 -- 50.