JHARKHAND STATE ELECTRICITY REGULATORY
COMMISSION
--------
NOTIFICATION
15th October, 2025
JSERC (Terms and Conditions for Determination of Transmission Tariff)
Regulations, 2025
Notification No.114--In exercise of powers conferred by sub section (1) of Section 181 and
clause (zd), (ze) and (zf) of sub-section (2) of Section 181, read with Sections 61, 62 and 86, of the
Electricity Act, 2003 (36 of 2003)and all other powers enabling it in that behalf, the Jharkhand State
Electricity Regulatory Commission, hereby makes the following Regulations. The Regulation is guided
by the principles contained in Sections 61 and 62 of the Act to encourage competition, efficiency,
economical use of resources, good performance and optimum investments by the Transmission
No. 473
2
Jharkhand Gazette (Extraordinary) Wednesday 15th October, 2025
Licensees within the State of Jharkhand and for determination of Multi-Year Tariff to be recovered
by the Transmission Licensees for the prudent expenses incurred towards providing reliable and
optimal transmission infrastructure for power supply to Distribution Licensees and Open Access
consumers within the State of Jharkhand.
CHAPTER I:
SCOPE, EXTENT AND DEFINITIONS
Short Title & Commencement
These Regulations shall be called the Draft Jharkhand State Electricity Regulatory
Commission (Terms and Conditions for Determination of Transmission Tariff)
Regulations, 2025.
These Regulations shall come into force for the period from April 1, 2026to March 31, 2031,
after its publication in the Official Gazette of the Government of Jharkhand and
unless reviewed earlier or extended by the Commission, shall remain in force upto
March 31, 2031.
These Regulations shall extend to the whole of the State of Jharkhand.
These Regulations shall supersede the Jharkhand State Electricity Regulatory Commission
(Terms & Conditions for Determination of Transmission Tariff) Regulations, 2020,
Jharkhand State Electricity Regulatory Commission (Terms& Conditions for
Determination of Transmission Tariff) Regulations, 2015, Jharkhand State Electricity
Regulatory Commission (Terms and Conditions for Determination of Transmission
Tariff) Regulations, 2010, Jharkhand State Electricity Regulatory Commission (Terms
and Conditions of Tariff determination, Multi-Year Tariff Framework) Regulations,
2007, read with all amendments thereto, as the case may be.
Explanation:-For all purpose including the review matters pertaining to period till
March 31, 2026, the issue related to determination of Aggregate Revenue
Requirement and Tariff shall be governed by the provisions of the Jharkhand State
Electricity Regulatory Commission (Terms & Conditions for Determination of
Transmission Tariff) Regulations, 2020,Jharkhand State Electricity Regulation
Commission (Terms and Conditions for Determination of Transmission Tariff)
Regulation, 2015 and Jharkhand State Electricity Regulatory Commission (Terms and
Conditions for determination of Transmission Tariff) Regulations, 2010,Jharkhand
State Electricity Regulatory Commission (Terms and Conditions of Tariff
determination, Multi-Year Tariff Framework) Regulations, 2007, including
amendment thereto, as may be applicable.
3
Jharkhand Gazette (Extraordinary) Wednesday 15th October, 2025
Scope of Regulations and Extent of Application
These Regulations shall be applicable for determination of Aggregate Revenue Requirement
and tariff for the intra-State transmission of electricity and apply to all the
Transmission Licensees in the State of Jharkhand.
These Regulations shall be applicable where the cost based/Aggregate Revenue Requirement
(ARR) based tariff is determined by the Commission:
Provided that these Regulations shall not be applicable where tariff has been
discovered through tariff based competitive bidding in accordance with the guidelines
issued by the Central Government and adopted by the Commission under Section 63
of the Act.
Definitions and Interpretation
In these Regulations, unless the context otherwise requires-
1.
‘Accounting Statement’ means for each financial year:
(i)
The Balance sheet, prepared in accordance with the form contained in The
Companies Act, 2013 and its predecessors, as applicable;
(ii)
Cash flow statement, prepared in accordance with the applicable Accounting
Standards of the Institute of Chartered Accountants of India;
(iii) Cost Accounting Records prescribed by the Central Government under section
148 of The Companies Act, 2013 and its predecessors, as applicable.
(iv) Notes on accounts thereto, and such other supporting statements and
information forming part of financial statements or as the Commission may
direct from time to time.
(v)
Profit and loss account, complying with the requirements contained in The
Companies Act, 2013 and its predecessors, as applicable;
(vi) Report of the Statutory Auditors, including any annexure and appendix thereto,
as applicable;
(vii) Any or all the formats as notified by the Commission under these regulations for
Tariff Regulation including Multi Year Tariff Regulations pertinent to the
relevant year.
4
Jharkhand Gazette (Extraordinary) Wednesday 15th October, 2025
(viii) Reconciliation Statement, duly certified by the statutory auditors, showing the
reconciliation between the total expenses, revenue, assets and liabilities, of the
entity as a Company and the expenses, revenue, assets and liabilities, separately
for each business regulated by the Commission and unregulated business
operations.
2.
‘Act’ means the Electricity Act, 2003 (36 of 2003), and subsequent
amendments thereof;
3.
‘Additional Capitalisation’ means the capital expenditure incurred and
capitalised or projected to be capitalised, after the date of commercial
operation of the project and admitted by the Commission after prudence
check, subject to provisions of Clause0of these Regulations;
4.
‘Aggregate Revenue Requirement’ or ‘ARR’ means application for each
financial year, the costs pertaining to the Licensed Business which are
admissible, in accordance with these Regulations, to be recovered in the form
of tariffs and charges as determined by the Commission;
5.
‘Allocation Statement’ means for each financial year a statement in respect
of each of the business (Transmission, SLDC, Other Business) of the
Transmission Licensee, showing the amounts of any revenue, cost, asset,
liability, reserve or provision, etc., which has been either:
(i)
Determined by apportionment or allocation between different
Businesses of the Transmission Licensee including the
Licensed Business, together with a description of the basis of
the apportionment or allocation; or
(ii)
Charged from or to each such Other Business together with a
description on the basis of that charge;
6.
‘Allotted Transmission Capacity’ means and includes the power transfer in
MW between the specified point(s) of injection and point(s) of drawl allowed
to a Long and Medium-Term Transmission Customer on the intra-State
transmission system under the normal circumstances and the expression
“allotment of capacity” shall be construed accordingly:
Provided that the Allotted Transmission Capacity to a Long-Term Transmission
Customer and Medium -Term Transmission Customer shall be sum of the
generating capacities allocated to the Long-Term Transmission Customer and
Medium-Term Transmission Customer respectively
5
Jharkhand Gazette (Extraordinary) Wednesday 15th October, 2025
7.
‘Applicant’ means a Transmission Licensee who has filed the Petition for
determination of transmission charge or a Petition for truing up or annual
performance review in accordance with the Act and these Regulations and
includes a Transmission Licensee whose tariff is subjected to review by the
Commission;
8.
‘Auditor’ means an auditor appointed by the Transmission Licensee, in
accordance with the provisions of the Companies Act, 2013,as amended from
time to time, or any other law for the time being in force;
9.
‘Availability’ in relation to a Transmission System for a given period shall
mean the time in hours during that period in which the Transmission System is
capable of transmitting electricity at its declared voltage to the delivery point
and shall be expressed in percentage of total hours in the given period;
10.
‘Bank Rate’ means the one-year Marginal Cost of Lending Rate (MCLR) of
the State Bank of India from time to time or any replacement thereof for the
time being in effect;
11.
‘Base Year’ means the Financial Year 2025-26 and used for the purposes of
these Regulations;
12.
‘Beneficiary(ies)’ shall mean Long-term, Medium-term or Short-term
Transmission Customers whose tariff is determined under these Regulations;
13.
‘Capital Cost’ means the capital cost as defined in Clauses0 and0 of these
Regulations;
14.
‘CERC’ or “Central Commission’ means the Central Electricity Regulatory
Commission;
15.
‘Change in Law’ means occurrence of any of the following events:
(i)
the enactment, bringing into effect or promulgation of any new Indian
Law; or
(ii)
adoption, amendment, modification, repeal or re-enactment of any
existing Indian law; or
(iii)
change in interpretation or application of any Indian law by a
competent court, Tribunal or Indian Governmental Instrumentality
which is the final authority under law for such interpretation or
application; or
6
Jharkhand Gazette (Extraordinary) Wednesday 15th October, 2025
(iv)
change by any competent statutory authority in any condition or
covenant of any consent, clearances or approval or licence available or
obtained for the project; or
(v)
coming into force or change in any bilateral or multilateral
agreement/treaty between the Government of India and any other
Sovereign Government having implication for the Transmission
Licensee regulated under these Regulations;
16.
‘Commission’ means the Jharkhand State Electricity Regulatory Commission
(JSERC);
17.
‘Conduct of Business Regulations’ means the JSERC (Conduct of Business)
Regulations2024, as amended from time to time;
18.
‘Control Period’ means a multi-year period fixed by the Commission, from
April 01, 2026 and up to March 31, 2031;
19.
‘Cut-off Date’ means March 31, of the year closing after two years of the year
of commercial operation of the project, and in case the project is declared
under commercial operation in the last quarter of financial year, the cut-off
date shall be March 31, of the year closing after three years of the year of
commercial operation:
Provided that the cut-off date may be extended by the Commission if it is
proved on the basis of documentary evidence that the capitalization could not
be made within the cut-off date for reasons beyond the control of the
Transmission Licensee
20.
‘Date of Commercial Operation’ or ‘COD’ means the date declared by the
Transmission Licensee from 00:00 hour of which an element of the
transmission system is in regular service after successful charging and trial
operation:
Provided that the transmission charge for the element shall be payable and its
availability shall be accounted for, from that date:
Provided further that in case an element of the transmission system is ready for
regular service but is prevented from providing such service for reasons not
attributable to the Transmission Licensee, its suppliers or contractors, the
Commission may approve the date of commercial operation prior to the
element coming into regular service;
7
Jharkhand Gazette (Extraordinary) Wednesday 15th October, 2025
21.
‘Day’ means the 24 hours period starting at 00:00 hour;
22.
‘De-capitalization’ for the purpose of the tariff under these Regulations,
means reduction in Gross Fixed Assets of the project corresponding to the
assets taken out of service;
23.
‘Deemed Transmission Licensee’ means a person/entity deemed to be a
Transmission Licensee under Section 14 of the Act;
24.
‘Distribution Licensee’ means a person who has been granted a Distribution
Licence under Section 14 of the Act and shall include a deemed Licensee;
25.
‘Expenditure Incurred’ means the fund, whether the equity or debt or both,
actually deployed and paid in cash or cash equivalent, for creation or
acquisition of a useful asset and does not include commitments or liabilities
for which no payment has been released;
26.
‘Existing Project’ means the project declared under commercial operation
from a date prior to April 01, 2026;
27.
‘Financial Year’ means a period commencing on April 01 of a calendar year
and ending on March 31 of the subsequent calendar year;
28.
‘Force Majeure Event’ means, with respect to any party, any event or
circumstance, or combination of events or circumstances, which is not within
the reasonable control of, and is not due to an act of omission or commission
of that party and which, by the exercise of reasonable care and diligence,
could not have been prevented; and, without limiting the generality of the
foregoing, shall include the following events or circumstances:
(i)
acts of God, including but not limited to lightning, storm, action of the
elements, earthquakes, flood, torrential rains, drought and natural
disaster or any acts of God beyond the control of any party or due to
any restraint of the State Govt. or Central Govt. or any other Statutory
Authority;
(ii)
strikes and industrial disturbances having a State-wide or extensive
impact in the area of supply of a Transmission Licensee, but excluding
strikes and industrial disturbances in the Transmission Licensee's own
organisation;
(iii)
acts of war, invasion, armed conflict or act of foreign enemy,
insurrections, riots, revolution, terrorist or military action;
8
Jharkhand Gazette (Extraordinary) Wednesday 15th October, 2025
(iv)
unavoidable accident, including but not limited to fire, explosion,
radioactive contamination and toxic chemical contamination;
(v)
any shutdown or interruption of the grid, which is required or directed
by the concerned Load Despatch Centre;
29.
‘Grid Code’ means the JSERC (Grid Code) Regulations, 2008, as amended or
replaced from time to time;
30.
‘Income from Other Business’ is the income received by the Transmission
Licensee other than from Tariff towards usage of assets and/or manpower
relating to regulated Business and shall exclude Non-Tariff Income;
31.
‘Licensee’ means a person who has been granted licence under Section 14 of
the Act and shall include deemed Licensee under the Act;
32.
‘Licensed Business’ means the functions and activities, which the Licensee is
required to undertake in terms of the Licence granted by the Commission or as
a deemed Licensee under the Act;
33.
‘Long-Term Transmission Customer’ means a person having a long-term
lien exceeding three years over an Inter/Intra-State Transmission System by
virtue of paying transmission charges and a Distribution Licensee shall
necessarily be a Long-Term user for which it will be required to enter into
appropriate agreement with the Transmission Licensee;
34.
‘Medium-Term Transmission Customer’ means a person having a Medium-
Term lien for means the period exceeding three months and up to three Years
over an inter / intra-State Transmission System by virtue of paying
transmission charges;
35.
‘Non-Tariff Income’ means net income relating to the Licensed Business
other than from tariff (Intra-State transmission of electricity), including but not
limited to profit derived from sale of scrap, rent of land or buildings, income
from investments, miscellaneous receipts, etc.;
36.
‘Other Business’ means any other business of the Transmission Licensee for
optimum utilisation of its assets within the meaning of Section 41 of the Act;
37.
‘Open Access Customer’ means any Licensee or Consumer or buyer or a
person engaged in generation who has been granted Open Access in
accordance with the JSERC (Terms and Conditions for Intra-State Open
Access) Regulations, 2016 as amended or replaced from time to time;
9
Jharkhand Gazette (Extraordinary) Wednesday 15th October, 2025
38.
‘Operation and Maintenance Expenses’ or ‘O&M Expenses’ means the
expenditure incurred for operation and maintenance of the project, or part
thereof, and includes the expenditure on manpower, repairs and maintenance,
spares, consumables, insurance and overheads;
39.
‘Original Project Cost’ means the capital expenditure incurred by the
Transmission Licensee, within the original scope of the project up to the cut-
off date as admitted by the Commission;
40.
‘Project’ means the transmission system;
41.
‘Prudence Check’ means scrutiny of reasonableness of any cost or
expenditure incurred or proposed to be incurred in accordance with these
Regulations by the Transmission Licensee;
42.
‘Rated Voltage’ means the manufacturer’s design voltage at which the
Transmission System is designed to operate and includes such lower voltage at
which any transmission line is charged or for the time being charged, in
consultation with Long Term Transmission Customers;
43.
‘Scheduled Commercial Operation Date’ or ‘SCOD’ shall mean the date(s)
of commercial operation of transmission system or element thereof and
associated communication system as indicated in the Investment Approval or
as agreed in transmission service agreement as the case may be, whichever is
earlier;
44.
‘Short-Term Transmission Customer’ in the context of usage of
Transmission System means a person having short-term lien for a period upto
three months over an inter / intra-State Transmission System by virtue of
paying transmission charges;
45.
‘Start Date or Zero Date’ means the date indicated in the Investment
Approval for commencement of implementation of the project and where no
such date has been indicated, the date of Investment Approval shall be deemed
to be Start Date or Zero Date;
46.
‘State’ means the Jharkhand State;
47.
‘State Load Despatch Centre’ or “SLDC’ means the centre established by
the State Government for purposes of exercising the powers and discharging
the functions under Section 31 of the Act;
10
Jharkhand Gazette (Extraordinary) Wednesday 15th October, 2025
48.
‘Statutory Charges’ comprises taxes, cess, duties, royalties and other charges
levied through Acts of the Parliament or State Legislatures or by Indian
Government Instrumentality under relevant statutes;
49.
‘Tariff Period’ shall mean the period from April 01, 2026 to March 31, 2031
for which Tariff is determined by the Commission under these Regulations;
50.
‘Transmission Business’ means the business of transmission of electricity
bya Transmission Licensee to a Beneficiary and permitted Open Access
customers;
51.
‘Transmission Licensee’ means a Licensee authorized to establish or operate
Intra-State transmission lines;
52.
‘Transmission service agreement’ means the agreement, contract,
memorandum of understanding, or any such covenant, entered into between
the Transmission Licensee and the Long-Term Transmission Customer(s) for
the use of Transmission System;
53.
‘Transmission System’ means a line or a group of lines with or without
associated sub-station, equipment associated with transmission lines and sub-
stations identified under the scheme as per the Investment Approval(s) and
shall include associated communication system;
54.
‘Transmission System Availability Factor’ means Availability of the
Transmission System as certified by the State Load Despatch Centre;
55.
‘Useful life’ in relation to a unit of a Transmission System from the COD shall
mean 25 years for sub-station, 15 years for communication system and 35
years for transmission line;
56.
‘Year’ means financial year;
Words and expressions used in these Regulations and not defined herein but defined in the
Act shall have the meanings respectively assigned to them in the Act.
Reference to any Act, Rules and Regulations shall include amendment or consolidation or re-
enactment thereof.
All proceedings under these Regulations shall be governed by the JSERC (Conduct of
Business) Regulations, 2024, as amended or re-enacted from time to time.
11
Jharkhand Gazette (Extraordinary) Wednesday 15th October, 2025
Norms of Operation to be Ceiling Norms
For removal of doubts, it is clarified that the norms of operation specified under these
Regulations are the ceiling norms and this shall not preclude the Transmission
Licensee and Beneficiaries from agreeing to improved norms of operation and in such
case the improved norms shall be applicable for the determination of tariff.
CHAPTER II:
Tariff framework and guiding principles for multi year tariff (MYT)
Multi Year Tariff (MYT) Framework
The MYT Framework shall commence from April 01, 2026 and unless reviewed earlier or extended by
the Commission, shall be applicable till March 31, 2031. The ARR filings for the Control Period
shall be done in accordance with the MYT Framework contained in these Regulations.
The Transmission Licensees shall file MYT Application along with supporting documents before the
Commission as per the timelines specified in Section 0 of these Regulations.
The MYT Application shall include statements containing ARR along with its break up for the Years of
the previous Control Period based on the Audited Accounts for FY 2020-21 to FY2024-25,
revised estimate for Base Year FY 2025-26and the projections for each year of the Control
Period.
The Guiding Principles for MYT Framework are described in Section 0 of these Regulations.
The principles for determination of ARR for the Control Period are described in Chapter III of these
Regulations and the procedure for annual filing during the Control Period is described in
Chapter IV of these Regulations.
Guiding Principles for MYT Framework
The Commission shall adopt Multi Year Tariff Framework for approval of ARR and expected revenue
from tariffs and charges. The ARR and tariffs shall be determined for each year of the Control
Period.
The MultiYear Tariff framework shall be based on the following:
(a) Business Plan of the Transmission Licensee for the entire Control Period to be filed before
the Commission for approval along with MYT Petition, prior to the start of the Control
Period or within such period as the Commission may direct;
(b) The Transmission System or network usage forecast for each year of the Control Period,
consistent with the Business Plan;
(c) Proposals for transmission tariff design for each year of the Control Period, including the
losses to be charged and the procedure thereof;
(d) Transmission Licensee’s forecast of expected ARR for each year of the Control Period,
transmission tariff for each year of the Control Period, based on reasonable assumptions of
the underlying financial and operational parameters laid down under these Regulations, and
on the basis of the Business Plan;
(e) Trajectory for specific parameters shall be prescribed by the Commission, for improvement
through incentives and disincentives;
13
Jharkhand Gazette (Extraordinary) Wednesday 15th October, 2025
(f) Annual review of performance, which shall be conducted vis-à-vis the approved forecast and
categorization of variations in performance into controllable and uncontrollable factors; and
(g) Mechanism for sharing approved gains or losses on account of controllable and
uncontrollable factors.
I.
Determination of Baseline
The values for the Base Year of the Control Period shall be determined on the basis of audited accounts
available for FY 2020-21 to FY 2024-25. In the absence of audited accounts of any such year,
the Commission may consider best estimate for such years after carrying out due, prudence
check and after taking in account other factors as considered relevant by the Commission.
The Commission shall normally not revise the performance targets during the Control Period, unless the
Commission is of the view that there is a major variation in approved numbers vis-à-vis actuals.
II.
Business Plan
The Transmission Licensee shall file for the Commission’s approval, a Business Plan approved by an
authorised signatory, as per the timelines specified in Section 0 of these Regulations.
The Business Plan shall be for the entire Control Period and shall, inter-alia, contain:
(a) Capital Investment Plan: This should be commensurate with load growth and quality
improvement proposed in the Business Plan. The Capital Investment Plan should also
include corresponding capitalisation schedule and financing plan;
The Transmission Licensee shall also submit scheme-wise capital structure and cost of financing
(interest on debt) and return on equity, Grant, Deposit Works along with terms of the existing
loan agreements, etc., as a part of Capital Investment Plan;
(b) Operational Plan: Actual yearly Transmission Loss in the preceding Control Period along
with year wise projection of Transmission Loss for the next Control Period.
(c) Human Resource Plan with manpower planning including details of the estimated year
wise manpower addition and retirements for the Control Period to meet the growth in
demand;
(d) Target Performance: A set of targets proposed for other controllable items such as
transmission system availability, Transmission losses, return on equity, depreciation,
working capital requirement, performance targets, Employee, R&M and A&G Expenses etc.,
along with detailed break up and any other information used for preparing projections of
various performance parameters and other components during the Control Period. The targets
shall be consistent with the Capital Investment Plan proposed by the Transmission Licensee;
(e) Non- Tariff Income: Proposals for Non-Tariff Income with item-wise description and
details;
(f) Income from Other Business: Proposals in respect of income from Other Business; and
14
Jharkhand Gazette (Extraordinary) Wednesday 15th October, 2025
(g) Business Plan shall also contain the requisite information for the preceding Control Period:
Provided that requisite information for the preceding Control Period shall include year-wise
audited data on Scheme-wise capital investment, capacity enhancement plan, if any,
proposed efficiency improvements and its cost benefit analysis, quality improvement
measures undertaken, Employee Expenses, Repair & Maintenance Expenses and A&G
Expenses along with detailed break up and any other information used for preparing
projections of various performance parameters and other components during the Control
Period.
III.
Capital Investment Plan
The Transmission Licensee shall file for the Commission’s approval a Capital Investment Plan for the
entire Control Period along with the Business Plan planned in accordance with provisions stated
in the Grid Code. The Capital Investment Plan shall be prepared scheme-wise and each scheme
shall include:
1. Purpose of investment (e.g. replacement of existing assets, meeting load growth,
improvement in quality and reliability of supply, etc);
2. Approval of Competent Authority;
3. Detail Project Report& Load Flow Analysis;
4. Capital Structure;
5. Capitalization Schedule;
6. Implementation schedule including timelines;
7. Cost-benefit analysis and Rate reasonability;
8. Improvement in operational efficiency envisaged in the Control Period;
9. Ongoing schemes that will spill over into the year under review along with
justification;
10. New schemes that will commence during the Control Period but may be completed
within or beyond the Control Period.
The Commission shall approve the system augmentation plan submitted by the Transmission Licensee,
based on the load growth forecast during the Control Period. The same would be considered for
computation of ARR, wherein the amount of electricity transmitted by the Transmission System
shall be projected considering the estimated growth plan of its Beneficiaries and any plans of
new transmission system, based on network expansion plans within the State:
The Capital Investment Plan shall be in conformity with the plans made by the CEA/CTU and with the
Capital Investment Plans of the Distribution Licensees and the Generating Companies and shall
be developed as per the procedure specified in the Grid Code.
During the Annual Performance Review, the Commission shall monitor the year-wise progress of the
actual capital expenditure incurred by the Transmission Licensee vis-à-vis the approved capital
expenditure. The Transmission Licensees shall submit the actual capital expenditure incurred
along with the Annual Performance Review Filing.
15
Jharkhand Gazette (Extraordinary) Wednesday 15th October, 2025
The Commission shall review the actual capitalisation at the end of each year of the Control Period vis-
à-vis the approved capitalisation schedule and shall true up the ARR based on the actual
capitalisation for the year for which True up has been filed and also ARR components for the
year for which APR and Tariff has been sought.
In case the capital expenditure is required for emergency work, which has not been approved in the
Capital Investment Plan, the Transmission Licensee shall submit an application containing all
relevant information along with reasons justifying emergency nature of the proposed work
seeking approval by the Commission:
Provided that in case the capital expenditure is required for emergency work or
unforeseen situation to mitigate threat to life and property and if prior intimation thereof to the
Commission shall cause any irreparable loss or injury, the Transmission Licensee may undertake
such capital expenditure and submit the details for post-facto approval of the Commission along
with the next Tariff Petition with all the relevant details.
IV.
Controllable & Uncontrollable Parameters
The ‘Controllable Parameters’ shall comprise but not be limited to the following parameters, which are
within the control of, and are attributable to the applicant:
a) Transmission System Availability
b) Transmission losses
c) Capital expenditure and additional capitalization
d) Interest and finance charges
e) Return on equity
f) Depreciation
g) Interest on working capital
h) Operation and Maintenance expenses
The ‘Uncontrollable Parameters’ shall comprise but not be limited to the following factors, which are
beyond control the applicant:
a) Terminal Liabilities of Employees
b) Foreign Exchange Rate Variations
c) Taxes and duties
d) Non-Tariff Income and Income from Other Business
The variation on account of uncontrollable parameters shall be treated as a pass through to be ultimately
charged to the consumers, subject to prudence check and approval by the Commission.
16
Jharkhand Gazette (Extraordinary) Wednesday 15th October, 2025
The Commission shall also permit pass-through of variations in controllable items on account of Force
Majeure events and due to Change in Law event(s) in the ARR, based on the submission of
actual values by the Transmission Licensee and subsequent validation and approval by the
Commission.
The variation from targets specified by the Commission on account of controllable parameters shall be
subject to incentive and penalty framework, as detailed in the subsequent section.
V.
Incentive and Penalty Framework
The net savings due to refinancing of Loans by the Transmission Licensee shall be shared between the
Users and Transmission Licensee, as the case may be, in the ratio of 50:50.
The financial gains on account of Operations and Maintenance Expenses for Transmission Licensee
shall be shared in the ratio of 50:50 between the Transmission Licensee and beneficiaries at the
time of truing up.
The Transmission Licensee shall be entitled to incentive on achieving annual availability beyond the
target availability, in accordance with the mechanism specified in these Regulations.
Incase of any loss on account of underperformance with respect to the controllable parameters, the
Transmission Licensee shall bear the entire losses and no proportion of the losses shall be passed
on to the Users of the Transmission System.
Truing Up
The Transmission Licensee shall submit along with the application for truing up, details of capital
expenditure and additional capitalization, transformation and transmission losses, sources of
financing, depreciation, operation and maintenance expenditure, actual loan portfolio with the
interest paid, Return on equity, variation in working capital along with other components of
ARR, for each year of the Control Period, on the basis of annual Audited Accounts as per the
Timelines stipulated in the Section0.
Where after the truing up, the Revenue recovered exceeds the ARR approved by the Commission under
these Regulations, the Transmission Licensee shall refund to the Beneficiaries as the case may
be, the surplus amount so recovered as specified in Clause 0 of these Regulations.
Where after the truing up, the Revenue recovered is less than the ARR approved by the Commission
under these Regulations, the Transmission Licensee shall recover from the Beneficiaries as the
case may be, the gap amount in accordance with Clause 0 of these Regulations.
The amount under-recovered or over-recovered, along with simple interest at the rate equal to Bank Rate
as on April 01 of the respective year plus 200 basis points, shall be recovered or refunded by the
Transmission Licensee in six equal monthly instalments starting within three months from the
date of the Tariff Order issued by the Commission:
17
Jharkhand Gazette (Extraordinary) Wednesday 15th October, 2025
Provided that no carrying cost on the duration of delay shall be allowed on unrecovered
gap if the Transmission Licensee fails to submit the Petition as per the timelines stipulated in
Section 0:
Provided further that any adverse financial impact for variation in uncontrollable items
due to lapse on part of the Transmission Licensee or its suppliers/contractors shall not be
allowed in truing up;
Annual Performance Review (APR)
The Transmission Licensee shall file APR Petition for Annual Performance Review, along with details
of capital expenditure, additional capitalization, sources of financing, operations and
maintenance expenditure, actual loan portfolio with the interest paid along with other
components of ARR incurred/projected to be incurred for the year under review, as per the
timelines stipulated in the Section 0 of these Regulations.
The Transmission Licensee along with Annual Performance Review petition, shall also claim revised
ARR for the following year based on the truing up and annual performance review of previous
year(s).
The Scope of the Annual Performance Review shall be comparison of the approved expenses vis-à-vis
revised estimates for the year/s and shall comprise the following:
a) Comparison of Performance Targets vis-a-vis revised estimates based on the latest
actual data available;
b) Comparison of Approved Capital Expenditure and Capitalisation vis-à-vis revised
estimates by the Transmission Licensee based on the latest actual data available;
c) Comparison of Other Expenses such as Interest on Loan, Interest on Working
Capital, Return on Equity, Depreciation and O&M Expenses approved by the
Commission vis-à-vis the revised estimates by the Transmission Licensee based on
the latest actual data available;
d) Computation of the sharing of gains and losses on account of controllable factors.
e) Approved Revenue vis-à-vis revised estimates based on the latest actual data
available
f) Any other Expenses/Revenue impacting ARR
The Transmission Licensee may, as a result of additional information not previously known or available
to them at the time the forecast was developed, apply for a modification in the approved forecast
of ARR as part of the Annual Performance Review.
The Commission if, as a result of additional information not previously known or available to it at the
time the forecast was developed, is of the view that the same may result in significant over/under
recovery, either suo-motu or on an application made by any interested or affected party, modify
the approved forecast of ARR for the remainder of the Control Period, as part of the Annual
Performance Review.
18
Jharkhand Gazette (Extraordinary) Wednesday 15th October, 2025
Based on the analysis of Annual Performance Review and truing up, the Commission, shall revise the
ARR and Tariff for the ensuing year of the Control Period.
Chapter III:
Determination of ARR
Details for True-up, APR and determination of ARR & Tariff
The Transmission Licensee shall submit the details for True-up for the previous year, Annual
Performance Review for the current year and Tariff Determination for the ensuing year as per
the principles discussed in the subsequent Sections.
Principles for determination of ARR
The Transmission Business revenue requirement would be used for determining non-discriminatory
transmission charges.
Till such time there is a complete segregation of accounts between Transmission Business and SLDC
activity, the ARR for each Business shall be supported by an allocation statement duly approved
by the Board of the Transmission Licensee containing the apportionment of all costs, revenues,
assets, liabilities, reserves and provisions between the Transmission Business, SLDC activity
and any Other Business of the Transmission Licensee. The allocation statement shall also
contain the methodology used for the apportionment between different Businesses.
Calculation of ARR for Transmission Business during the
Control Period
The Aggregate Revenue Requirement for the Transmission Business of the Licensee, for each year of
the Control Period, shall comprise the following items:
a) Operation and Maintenance Expenses;
b) Return on Equity;
c) Interest on Working Capital;
d) Interest on Loans;
e) Interest on Security Deposit (if any);
f) Depreciation;
g) Income Tax;
h) Lease Charges;
i) Foreign Exchange Rate Variation;
j) Less: Non-Tariff Income;
k) Less: Income from Other Business.
Capital Cost
The capital cost admitted by the Commission after prudence check shall form the basis for
determination of tariff:
19
Jharkhand Gazette (Extraordinary) Wednesday 15th October, 2025
Provided that where the Commission has given ‘in principle’ approval to the estimates of
scheme capital cost and financing plan, the same shall be the guiding factor for applying
prudence check on the actual capital expenditure:
Provided further that in case of the existing schemes, the capital cost admitted by the
Commission prior to April 01, 2026 and the additional capital expenditure projected to be
incurred for respective year of the Control Period from FY 2026-27 to FY 2030-31 as may be
admitted by the Commission, shall form the basis for determination of capital cost.
Provided also that any increase in Capital Cost due to time/cost over-run shall only be
allowed in case the Transmission Licensee, establishes with the support of appropriate
documents and facts to the satisfaction of the Commission that the delay was on account of
uncontrollable factors and not attributable to the Transmission Licensee.
Capital cost to be allowed by the Commission for the purpose of determination of tariff will be based on
the Capital Investment Plan prepared by the Transmission Licensee and approved by the
Commission.
The amount of any contribution made by Beneficiary, distribution system users, Capital subsidy&
Grants towards work for connection to the transmission system of the Transmission Licensee
shall be deducted from the original cost of the scheme for the purpose of calculating the amount
under debt and equity under these Regulations.
Further, in case such cost has been incurred towards replacement or up gradation of any existing assets,
the original cost of the replaced asset shall be reduced and de-capitalized from the Capital Cost.
The capital cost of the Transmission Licensee shall includethe following:
(a)
the expenditure incurred or projected to be incurred on original scope of work, including
interest during construction and financing charges, any gain or loss on account of foreign
exchange risk variation during construction,on the actual loan up to the date of commercial
operation of the scheme, as admitted by the Commission, after prudence check shall form
the basis for determination of Tariff;
(b)
Interest during Construction (IDC)and financing charges, on the actual loans drawn;
(i)
Interest during construction (IDC) shall be computed corresponding to the loan from the
date of infusion of debt fund, and after taking into account the prudent phasing of funds
upto SCOD;
(ii)
In case of additional costs on account of IDC due to delay in achieving the SCOD, the
Transmission Licensee shall be required to furnish detailed justifications with supporting
documents for such delay including prudent phasing of funds:
Provided that if the delay is not attributable to the Transmission Licensee and is
due to uncontrollable factors as specified in Clause 0of these Regulations, IDC may be
allowed after due prudence check:
20
Jharkhand Gazette (Extraordinary) Wednesday 15th October, 2025
Provided further that if the delay in achieving the COD is attributable either in
entirety or in part to the Transmission Licensee or its contractor or supplier or agency, in
such cases, IDC beyond SCOD may be disallowed after prudence check either in entirety
or on pro-rata basis corresponding to the period of delay not condoned and the liquidated
damages, if any, recovered from the contractor or supplier or agency shall be retained by
the Transmission Licensee;
(c)
Incidental Expenditure during Construction (IEDC)as computed in accordance with these
Regulations;
(i)
Incidental expenditure during construction shall be computed from the zero date and after
taking into account pre-operative expenses up to SCOD:
Provided that any revenue earned during construction period up to SCOD on
account of interest on deposits or advances, or any other receipts may take into account
for reduction in incidental expenditure during construction;
(ii)
In case of additional costs on account of IEDC due to delay in achieving the SCOD, the
Transmission Licensee shall be required to furnish detailed justification with supporting
documents for such delay including the details of incidental expenditure during the period
of delay and liquidated damages recovered or recoverable corresponding to the delay:
Provided that if the delay is not attributable to the Transmission Licensee and is
due to uncontrollable factors as specified in Clause 0, IEDC may be allowed after due
prudence check:
Provided further that where the delay is attributable to an agency or contractor
or supplier engaged by the Transmission Licensee, the liquidated damages recovered
from such agency or contractor or supplier shall be taken into account for computation of
capital cost;
(iii) If the delay in achieving the COD is attributable either in entirety on in part to the
Transmission Licensee or its contractor or supplier or agency, in such cases, IEDC
beyond SCOD may be disallowed after prudence check either in entirety or on pro-rata
basis corresponding to the period of delay not condoned and the liquidated damages, if
any, recovered from the contractor or supplier or agency shall be retained by the
Transmission Licensee;
(d)
capitalized initial spares subject to the ceiling norms as percentage of plant and machinery
cost as under:
i.
Transmission line-
1.00%
ii.
Transmission substation(Green Field)-
4.00%
iii.
Transmission Substation (Brown Field) –
6.00%
iv.
Series compensation devices and HVDC Station-
4.00%
v.
Gas Insulated Sub-station (Green Field) –
5.00%
vi.
Gas Insulated Sub-station (Brown Field) –
7.00%
21
Jharkhand Gazette (Extraordinary) Wednesday 15th October, 2025
vii.
Communication System –
3.50%
viii.
Static Synchronous Compensation –
6.00%:
Provided that the Plant and Machinery cost shall be considered as the original project cost
excluding IDC, IEDC, Land Cost and Cost of Civil Works. The Transmission Licensee for the
purpose of estimating Plant and Machinery Cost, shall submit the break-up of head-wise IDC
and IEDC in its tariff application;
(e)
Additional capital expenditure determined under Clause0 of these Regulations:
Provided that the assets forming part of the Project, but not in use shall be taken out of the
capital cost;
(f)
In case any asset(s) have been replaced, the original value of such assets shall be de-
capitalised and reduced while approving the capitalisation for that year.
The following shall be excluded from the capital cost of the existing and new projects:
(a) The assets forming part of the project, but not in use;
(b) De-capitalised assets after the date of commercial operation on account ofreplacement or
removal on account of obsolescence.
Controllable and Uncontrollable factors
The following factors shall be considered as controllable and uncontrollable factors for deciding time
over-run, cost escalation, IDC and IEDC of the project.
The “controllable factors” shall include but shall not be limited to the following:-
1. Efficiency in the implementation of the project not involving approved change in scope of
such project, change in statutory levies or change in law or Force Majeure events; and
2. Delay in execution of the project on account of contractor or supplier or agency of the
Transmission Licensee except due to uncontrollable factors.
The “uncontrollable factors” shall include but shall not be limited to the following:-
1. Force Majeure events;
2. Change in law; and
3. Delay in Land acquisition, obtaining statutory approval and ROW Issues except where the
delay is attributable to the Transmission Licensee.
22
Jharkhand Gazette (Extraordinary) Wednesday 15th October, 2025
Additional Capitalisation
Additional Capitalisation within the original scope and upto the Cut-off date:
The additional capital expenditure in respect of a new project or an existing project incurred or
projected to be incurred, on the following counts within the original scope of work, after
the date of commercial operation and up to the cut-off date may be admitted by the
Commission, subject to prudence check:
a) Undischarged liabilities recognized to be payable at a future date;
b) Works deferred for execution;
c) Procurement of initial capital spares within the original scope of work, in accordance
with the provisions of Clause 10.6 (d) of these Regulations;
d) Liabilities to meet award of arbitration or for compliance of the order or directions
of any statutory authority, or order or decree of any court of law;
e) On account of Change in Law or compliance of any existing law; and
f) Capital Expenses incurred due to force majeure conditions.
Provided in case of any replacement/up-gradation of the assets, the additional
capitalization shall be worked out after adjusting the gross fixed assets and cumulative
depreciation of the assets replaced on account of de-capitalization;
The Transmission Licensee shall submit the details of works asset wise/work wise, included in
the original scope of work along with estimates of expenditure, liabilities recognized to
be payable at a future date and works deferred for execution along with the application
for determination of tariff.
Additional Capitalisation within original scope and after the cut-off date:
The additional capital expenditure incurred or projected to be incurred in respect of an existing
project or a new project on the following counts within the original scope of work and
after the cut-off date may be admitted by the Commission, subject to prudence check on
the following counts:
(i)
Liabilities to meet award of arbitration or for compliance of the order or
directions or order of any statutory authority, or order or decree of any court of
law;
(ii)
On account of Change in law;
(iii)
Liability of works executed prior to the cut-off date;
(iv)
Force Majeure events;
(v)
Liability for works admitted by the Commission after the cut-off date to the
extent of discharge of such liabilities by actual payments;
In case of replacement/up-gradation of assets deployed under the original scope of the existing
project after cut-off date, the additional capitalization may be admitted by the
Commission, after making necessary adjustments in the gross fixed assets and the
cumulative depreciation, subject to prudence check on the following grounds:
23
Jharkhand Gazette (Extraordinary) Wednesday 15th October, 2025
a) The useful life of the assets is not commensurate with the useful life of the project
and such assets have been fully depreciated in accordance with the provisions of
these Regulations;
b) The replacement of the asset or equipment is necessary on account of change in law
or Force Majeure conditions;
c) The replacement of such asset or equipment is necessary on account of obsolescence
of technology; and
d) The replacement of such asset or equipment has otherwise been allowed by the
Commission.
Additional Capitalisation beyond the original scope:
The capital expenditure, in respect of existing transmission system including communication
system, incurred or projected to be incurred on the following counts beyond the original
scope, may be admitted by the Commission, subject to prudence check:
(i)
Liabilities to meet award of arbitration or for compliance of order or directions
of any statutory authority, or order or decree of any court of law;
(ii)
Change in law or compliance of any existing law;
(iii)
Force Majeure events;
(iv)
Need for higher security and safety of the plant as advised or directed by
appropriate Indian Government Instrumentality or statutory authorities
responsible for national or internal security;
In case of de-capitalisation of assets of a Transmission Licensee, the original cost of such asset
as on the date of decapitalisation duly certified by its Statutory Auditor shall be deducted
from the value of gross fixed asset and corresponding outstanding loan on such assets as
well as equity shall be deducted from loan and the equity balances respectively. Such
deduction shall be carried out in the year such de-capitalisation takes place with
corresponding adjustments in cumulative depreciation and cumulative repayment of loan
shall be carried out, duly taking into consideration the year in which it was capitalised.
Impact of additional capitalisation within the approved scheme cost on tariff shall be considered by the
Commission during the Annual Performance Review.
Provided that the Commission may consider any new scheme proposed on merits subject to
prudence check as per this Tariff Regulation.
Additional Capitalisation on account of Renovation and Modernisation:
The Transmission Licensee, intending to undertake renovation and modernization of the
transmission system or element thereof for the purpose of extension of life beyond the
originally recognised useful life for the purpose of tariff, shall file a Petition before the
Commission for approval of the proposal with a Detailed Project Report giving complete
scope, justification, cost-benefit analysis, load flow analysis, rate reasonability, estimated
life extension from a reference date, financial package, phasing of expenditure, schedule
of completion, reference price level, estimated completion cost including foreign
24
Jharkhand Gazette (Extraordinary) Wednesday 15th October, 2025
exchange component, if any, and any other information considered to be relevant by the
Transmission Licensee:
Provided that the Transmission Licensee intending to undertake renovation and
modernization shall be required to obtain the consent of the beneficiaries or the long-term
customers, as the case may be, for such renovation and modernization and submit the
same along with the Petition.
Where the Transmission Licensee, makes an application for approval of its proposal for
renovation and modernisation, approval may be granted after due consideration of
reasonableness of the proposed cost estimates, load flow analysis, financing plan,
schedule of completion, interest during construction, use of efficient technology, cost-
benefit analysis, expected duration of life extension, consent of the beneficiaries or long
term customers, if obtained, and such other factors as may be considered relevant by the
Commission.
After completion of the renovation and modernisation, the Transmission Licensee shall file a
Petition for determination of tariff. Expenditure incurred or projected to be incurred and
admitted by the Commission after prudence check, and after deducting the accumulated
depreciation already recovered from the admitted project cost, shall form the basis for
determination of tariff.
Operation and Maintenance (O&M) expenses
Operation and Maintenance (O&M) expenses shall comprise the following:
(a) Salaries, wages, pension contribution and other employee costs;
(b) Administrative and General costs;
(c) Repairs and maintenance (O&M) expenses;
The O&M expenses for the Base Year of the Control Period shall be approved by the Commission
taking into account the audited accounts of FY 2020-21 to FY 2024-25, Business Plan filed by
the Transmission Licensees, estimates of the actuals for the Base Year, prudence check and any
other factor considered appropriate by the Commission.
O&M expenses permissible towards ARR for each year of the Control Period shall be determined using
the formula detailed below:
O&Mn = (R&Mn + EMPn + A&Gn) + Terminal liabilities;
Where,
R&Mn – Repair and Maintenance Costs of the TransmissionLicensee for the nth year;
A&Gn – Administrative and General Costs of the TransmissionLicensee for the nth year;
EMPn – Employee Costs of the TransmissionLicensee for the nth year excluding terminal
liabilities.
25
Jharkhand Gazette (Extraordinary) Wednesday 15th October, 2025
The above components shall be computed in the manner specified below:
R&Mn= K*GFA*(INDXn/INDX0)
Where
“K’ is constant (expressed in %) governing the relationship between R&M costs
and Gross Fixed Assets (GFA) and shall be calculated based on the % of R&M to
GFA of the preceding years of the Base Year in the MYT Order after normalising
any abnormal expenses;
‘GFA’ is opening value of the gross fixed asset of the nth year;
INDXn is the indexation for nth year of control period;
INDXo is the indexation for the base year of the control period;
EMPn+ A&Gn= [(EMPn-1)* (1+Gn)+ (A&Gn-1)] *(INDXn/INDXn-1)
Where,
EMPn-1 – Employee Costs of the TransmissionLicensee for the (n-1)th year
excluding terminal liabilities;
A&Gn-1 – Administrative and General Costs of the TransmissionLicensee for the
(n-1)th year excluding legal/litigation expenses;
INDXn– Inflation Factor to be used for indexing the employee cost and A&G
cost. This will be a combination of the Consumer Price Index (CPI) and the
Wholesale Price Index (WPI) for immediately preceding year before the base
year;
Gn– is a growth factor for the nth year and it can be greater than or lesser than
zero based on the actual performance. Value of Gn shall be determined by the
Commission in the MYT Order for meeting the additional manpower requirement
based on the Transmission Licensee’s Filing, benchmarking and any other factor
that the Commission feels appropriate;
INDXn = 0.55*CPIn + 0.45*WPIn
Note 1: For the purpose of estimation, the same INDX n/INDXn-1value shall be used for all years of the
Control Period. However, the Commission will consider the actual values in the INDX n/INDXn-
1 at the end of each year during the Annual Performance Review exercise and true up the
employee cost and A&G expenses on account of this variation, for the Control Period;
Note 2: Any variation due to changes recommended by the Pay Commission or wage revision
agreement, etc., will be considered separately by the Commission;
Note 3: Terminal Liabilities will be approved as per actual submitted by the TransmissionLicensee or be
established through actuarial studies.
26
Jharkhand Gazette (Extraordinary) Wednesday 15th October, 2025
The Petitioner, in addition to the above details shall also submit the detailed break-up of the
Legal/Litigation Expenses for the previous Years (FY 2021-22 to FY 2025-26) along with the
details and documentary evidence of incurring such expenses. The Commission shallapprove the
legal expenses as per the relevant provisions of the Jharkhand State Litigation Policy based on
the necessary documentary evidence submitted for the Control Period and shall carry out due
prudence check of legal expensesat the time of truing up.
Debt-Equity Ratio
Existing Schemes - In case of capital expenditure schemes capitalized prior to April 01, 2026, the debt-
equity ratio allowed by the Commission for determination of tariff for the period ending March
31, 2026 shall be considered.
New Scheme – For capital expenditure scheme capitalized on or after April 01,2026;
A normative debt-equity ratio of 70:30 shall be considered for the purpose of determination of
Tariff;
In case the actual equity employed is in excess of 30%, the amount of equity for the purpose of
tariff determination shall be limited to 30%, and the balance amount shall be considered
as normative loan;
In case the actual equity employed is less than 30%, the actual debt-equity ratio shall be
considered;
The premium, if any raised by the Transmission Licensee while issuing share capital and
investment of internal accruals created out of free reserve, shall also be reckoned as paid
up capital for the purpose of computing return on equity, provided such premium amount
and internal accruals are actually utilized for meeting capital expenditure.
Note 1: Any expenditure admitted on account of committed liabilities within the original scope
of work and the expenditure deferred on techno-economic grounds but falling within the original
scope of work shall be serviced in the normative debt-equity ratio specified in these Regulations;
Note 2: Any expenditure on replacement of old assets or on renovation and modernization or life
extension shall be considered on normative debt-equity ratio specified in these Regulations after
writing off the entire book value of the original assets from the capital cost of the new asset;
Note 3: Any expenditure admitted by the Commission for determination of tariff on account of
new works not in the original scope of work shall be serviced in the normative debt-equity ratio
specified in these Regulations.
The Transmission Licensee shall submit the resolution of the Board of the Company or approval of the
competent authority in other cases regarding infusion of funds from internal resources in support
of the utilization made or proposed to be made to meet the capital expenditure of the
Transmission Licensee.
27
Jharkhand Gazette (Extraordinary) Wednesday 15th October, 2025
Return on Equity
The rate of return on equity shall be 14.00% (post-tax) for the Control Period.
Return on equity for each year shall be allowed on equity employed in assets in use considering the
following:
Equity employed in accordance with Clause 0of these Regulations on assets (in use) capitalised
as on the beginning of the year; and
50% of the equity projected to be employed in accordance with Clause0of these Regulations on
assets (in use) commissioned during the year.
Interest on Loan Capital
The loans arrived at in the manner indicated in Clauses0 and 0of these Regulations shall be considered
as gross normative loan for calculation of interest on loan.
The normative loan outstanding as on April 01, 2026shall be worked out by deducting the cumulative
repayment as admitted by the Commission up to March 31, 2026 from the gross normative loan.
The repayment for the year of the Control Period shall be deemed to be equal to the depreciation
allowed for that year.
In case of de-capitalization of assets, the repayment shall be adjusted by taking into account cumulative
repayment on a pro-rata basis and the adjustment should not exceed cumulative depreciation
recovered up to the date of de-capitalization of such assets.
Notwithstanding any moratorium period availed by the Transmission Licensee, the repayment of loan
shall be considered from the first year of commercial operation of the scheme.
The rate of interest shall be the weighted average rate of interest calculated on the basis of the actual
loan portfolio at the beginning of each Year applicable to the Transmission Licensee:
Provided that if there is no actual loan for a particular year but normative loan is still
outstanding, then the rate of interest shall be considered on normative basis and shall be equal to
the Bank Rate as on April 01 of the respective year of the Control Period plus 200 basis points.
The interest on loan shall be calculated on the normative average loan of the year by applying the
weighted average rate of interest.
The above interest computation shall exclude interest on loan amount, normative or otherwise, to the
extent of capital cost funded by Consumer Contribution, Grants or Deposit Works carried out by
Transmission Licensee.
The Transmission Licensee shall make every effort to re-finance the loan as long as it results in net
savings on interest and in that event the costs associated with such re-financing shall be borne by
the users and the net savings shall be shared between the users and the Transmission Licensee, in
the ratio of 50:50.
28
Jharkhand Gazette (Extraordinary) Wednesday 15th October, 2025
Depreciation
Depreciation shall be calculated for each year of the Tariff period, on the amount of Capital Cost of the
assets admitted by the Commission:
Provided that depreciation shall not be allowed on assets funded by contribution from
Beneficiary, Distribution system user, Capital Subsidy Grants. Provision for replacement of such
assets shall be made in the Capital Investment Plan.
Depreciation for each year shall be determined based on the methodology as specified in these
Regulations along with the rates and other terms specified in these Regulations.
Depreciation shall be calculated annually, based on the straight-line method at the rates specified at
Appendix-I. The base value for the purpose of depreciation shall be original cost of the asset:
Provided that the TransmissionLicensee shall ensure that once the individual asset is
depreciated to the extent of seventy (70) percent of the Book Value of the asset, remaining
depreciable value as on March 31 of the closing shall be spread over the balance useful life of
the asset.
Depreciation shall be charged from the first year of operation of the asset. In case, the operation of the
asset is for a part of the year, depreciation shall be charged on a pro-rata basis.
The residual value of assets shall be considered as 10% and depreciation shall be allowed to a maximum
of 90% of the original cost of the asset. Land is not a depreciable asset and its cost shall be
excluded while computing 90% of the original cost of the asset:
Provided that the salvage value for IT equipment and software shall be considered as NIL
and 100% value of the assets shall be considered depreciable.
The Commission may, in the absence of the Fixed Assets Register, calculate Depreciation (%) arrived
by dividing the Depreciation and the Average Gross Fixed Assets as per the latest available
Audited Accounts of theTransmission Licensee. The Depreciation (%) so arrived shall be
multiplied by the Average GFA approved by the Commission for the relevant Financial Year to
arrive at the Depreciation for that Financial Year.
In case of de-capitalization of assets, the cumulative depreciation shall be adjusted by taking into
account the depreciation recovered through tariff corresponding to the decapitalised asset during
its useful services.
Interest on Working Capital
Working Capital for the Transmission Licensee shall comprise:
(a) Maintenance spares @ 15% of the O&M expenses specified in Clauses 0- 0of these
Regulations;
(b) Receivables equivalent to 45 days of annual fixed cost;
29
Jharkhand Gazette (Extraordinary) Wednesday 15th October, 2025
(c) Operation and Maintenance expenses for one month;
(d) Less: Interest on amount, if any, held as security deposits from Transmission system users.
Rate of interest on working capital shall be equal to the Bank Rate as on September 30 of the financial
year in which the MYT Petition is filed plus 350 basis points. At the time of true up, the interest
rate shall be adjusted as per the actual rate prevailing on April 01 of the financial year for which
truing up exercise has been undertaken.
The interest on working capital shall be payable on normative basis notwithstanding that the
Transmission Licensee has not taken working capital loan from any outside agency.
Income Tax
Tax on income, if any, on the Licensed business of the TransmissionLicensee shall be limited to tax on
the allowed return on equity.
The income tax actually payable or paid limited to the tax on allowed return on equity shall be included
in the ARR while truing up. The actual assessment of income tax should take into account
benefits of tax holiday, and the credit for carry forward losses applicable as per the provisions of
the Income Tax Act, 1961 and its amendments thereof shall be passed on to the consumers. Tax
on the other income streams of the Transmission Licensee shall not be recovered from the
Beneficiaries.
Non-Tariff Income
The amount of Non-Tariff Income relating to the Transmission Business as approved by the
Commission in prudent, fair and just manner shall be deducted from the ARR in determining the
Tariff for Transmission Business:
Provided that the Transmission Licensee shall submit full details of its forecast of Non-
Tariff Income to the Commission in such form as may be stipulated by the Commission.
The Non-Tariff Income shall include:
Income from rent of land or buildings;
Income from sale of scrap;
Income from investments;
Interest accrued on advances to suppliers/contractors;
Interest income on loans / advances to employees;
Income from rental of staff quarters;
Income by rental from contractors;
Income by hire charges from contactors and others;
Income by supervision charges, etc.;
Supervision charges for capital works;
Income from advertisements;
30
Jharkhand Gazette (Extraordinary) Wednesday 15th October, 2025
Income from sale of tender documents;
Profit from sale of assets (i.e. difference in Sale Value and Book Value)
Any other Non-Tariff Income:
Provided that the interest earned from investments made out of Return on Equity
corresponding to the regulated Business of the Transmission Business shall not be included in
Non-Tariff Income.
Provided that the onus to substantiate, to the satisfaction of the Commission, that such
investments have been out of Return on Equity shall be on the Licensee.
Income from other Business of the Transmission Licensee
Where the Transmission Licensee is engaged in any Other Business utilising infrastructure and/or
manpower of regulated business by any means in accordance with Section 41 of the Electricity
Act, 2003, the income from such Business shall be calculated considering the following
conditions:
The TransmissionLicensee shall not in any manner utilize the assets and facilities of the
Licensed Business or otherwise directly or indirectly allow the activities to be undertaken
in a manner that it results in the Licensed Business subsidising the Other Business in any
manner;
The TransmissionLicensee shall not in any manner, directly or indirectly encumber the assets
and facilities of the Licensed Business for the Other Business or for any activities other
than the Licensed Business;
The TransmissionLicensee shall duly pay for all costs accounted for in the Licensed Business,
which have been incurred for Other Business and in the event of such cost being incurred
commonly for both the Licensed Business and Other Business, apportion such cost and
ensure due payment of apportioned costs to the Licensed Business from the Other
Business;
The revenue derived from the Other Business shall be commensurate with prevailing market
condition for such similar business activities;
In addition to the sharing of costs under sub-clause c) above, the TransmissionLicensee shall
account for and ensure due payment to the Licensed Business a certain proportion of
revenues from the other Business. As a general principle, the TransmissionLicensee shall
retain 50% of the revenues arising on account of Other Business and pass on the
remaining 50% of the revenues to the consumers.
The revenue from Other Business shall be deducted from the ARR in calculating the revenue
requirement of the TransmissionLicensee in a prudent, fair and just manner:
31
Jharkhand Gazette (Extraordinary) Wednesday 15th October, 2025
Provided that the TransmissionLicensee shall follow a reasonable basis for allocation of
all joint and common costs between the Transmission and the Other Business and shall submit
the Allocation Statement as approved by the Board of Directors to the Commission along with
his application for determination of tariff:
Provided further that where the sum total of the direct and indirect costs of such Other
Business exceeds the revenues from such Other Business, no amount shall be allowed to be
added to the ARR of the TransmissionLicensee on account of such Other Business.
Quality of Supply
The Commission shall monitor the following Quality of Supply parameters during the Control Period:
(a) Transmission System Availability;
(b) Transformer Failure across various capacities, represented by the number of transformer
failures as a percentage of the total number of transformers in that specified capacity within
the Transmission System, over a specified period of time.
The Transmission Licensee in its Business Plan filings shall submit and propose the trajectory for the
achievement of quality targets. The Commission will specify the targets for each parameter. The
Transmission Licensee shall submit its performance on each parameter in the form and manner
specified by the Commission.
Norms of operation
Normative Annual Transmission System Availability factor (NATSAF): for recovery of full
transmission charges shall be as under:
For recovery of Annual Fixed Charges:
AC system: 98.0% for the Control Period from FY 2026-27 to FY 2030-31;
HVDC bi-pole links: 95.0% for the Control Period from FY 2026-27 to FY 2030-31;
HVDC back-to-back stations: 95.0% for the Control Period FY 2027-31:
Provided that the normative annual transmission availability factor of the HVDC bi-pole links
shall be 85%for first twelve months from the date of commercial operation.
For incentive consideration:
AC system: 98.50% for the Control Period FY 2027-31;
HVDC bi-pole links: 95.0% for the Control Period FY 2027-31;
HVDC back-to-back stations: 95.0% for the Control Period FY 2027-31:
Provided that no incentive shall be payable for availability beyond 99.85%:
32
Jharkhand Gazette (Extraordinary) Wednesday 15th October, 2025
Provided further that for AC system, two trippings per year shall be allowed. After two
trippings in a year, additional 12 hours outage shall be considered in addition to the actual
outage:
Provided also that in case of outage of a transmission element affecting evacuation of power
from a generating station, outage hours shall be multiplied by a factor of 2.
Auxiliary Energy Consumption in the sub-station
AC System: The charges for auxiliary energy consumption in the AC sub-station for the purpose
of air-conditioning, lighting and consumption in other equipment shall be borne by the
Transmission Licensee and included in the normative operation and maintenance expenses.
Annual Transmission Charge
The Transmission Licensee shall be entitled to recover its Annual Transmission Charges (ATC) from
Beneficiaries as specified in Clauses 0 to 0 of these Regulations.
Recovery of Fixed Charges
The fixed cost of the Transmission System shall be computed on annual basis, in accordance with norms
contained in these Regulations, aggregated as appropriate, and recovered on monthly basis as
transmission charge from the users.
The transmission charge (inclusive of incentive) payable for a calendar month for a Transmission
System or part thereof shall be
a. For TAFM < 98%
AFC x (NDM/NDY) x (TAFM/98%)
b. For TAFM: 98%< TAFM < 98.5%
AFC x (NDM/NDY) x (1)
c. For TAFM: 98.5%< TAFM < 99.85%
AFC x (NDM/NDY) x (TAFM/98.5%)
d. For TAFM > 99.85%
AFC x (NDM/NDY) x (99.85%/98.5%)
Where,
AFC = Annual Fixed Cost specified for the year, in Rupees;
NDM = Number of days in the month;
NDY = Number of days in the year; and
33
Jharkhand Gazette (Extraordinary) Wednesday 15th October, 2025
TAFM = Transmission system availability factor for the month, in percent, computed in
accordance with Appendix –III to these Regulations.
The Transmission Licensee shall raise the bill for the transmission charge (inclusive of incentive) for a
month based on its estimate of TAFM. Adjustments, if any, shall be made on the basis of the
TAFM to be certified by the SLDC within 30 days from the last day of the relevant month.
Allocation of Annual Transmission Charge
The Annual Transmission Charge (ATC) shall be allocated as specified in Jharkhand State Electricity
Regulatory Commission (Framework for sharing of charges for Intra-State Transmission
System) Regulations, 2019 as amended or replaced from time to time.
Late Payment Surcharge
In case the payment of any bill for charges payable under these Regulations is delayed by a Consumer
beyond a period of 60 days from the date of billing, a late payment surcharge at the Bank Rate
as on April 01 of the respective year plus 200 basis points shall be applicable for the first month
and for every month or part thereof delay the rate shall increase by 50 basis points subject to a
maximum of Bank Rate as on April 01 of the respective year plus 500 basis point shall be levied
by the Transmission Licensee.
Provided that the rate of Late Payment Surcharge shall not exceed the rate specified in
the TSA entered between the Transmission Licensee and its Beneficiaries.
Rebate
For payment of bills of the Transmission Licensee within 5 days of presentation of bills by the
Transmission Licensee, a rebate of 2.00% shall be allowed.
Provided that if percentage of Rebate has been agreed between the Transmission
Licensee and Beneficiary/ies in TSA, the same shall be applicable.
Note: In case of computation of 5 days, the number of days shall be counted consecutively
without considering any holiday. However, in case the last day or 5th day is official holiday, the
5th day for the purpose of Rebate shall be construed as the immediate succeeding working day
(as per the official state Government’s calendar, where the office of the Authorized signatory or
Representative of the Beneficiary, for the purpose of receipt or acknowledgement of Bill is
situated.
Deviation from norms
The transmission charges by the Transmission Licensee may also be determined indeviation of the
norms specified in these Regulations subject to the conditions that-
34
Jharkhand Gazette (Extraordinary) Wednesday 15th October, 2025
(a) The levelized Tariff over the useful life of the Project, calculated based on the discounting
factor as notified by the CERC from time to time for the Projects under Section 63 of the
Act, on the basis of the norms in deviation does not exceed the levelized Tariff calculated
on the basis of the norms specified in these Regulations; and
(b) Any deviation shall come into effect only after approval by the Commission, for which an
application shall be made by the Transmission Licensee before filing tariff Petition / ARR
for determination of Tariff.
Lease charges
Lease charges for assets taken on lease by the Transmission Licensee shall be considered as per lease
agreement, provided they are considered reasonable by the Commission.
Foreign Exchange Rate Variation
The Transmission Licensee may hedge foreign exchange exposure in respect of the interest on foreign
currency loan and repayment of foreign loan acquired for the Transmission System, in part or
full at the discretion of the Transmission Licensee.
Every Transmission Licensee shall recover the cost of hedging of Foreign Exchange Rate Variation
corresponding to the normative foreign debt, in the relevant Year on Year-to-Year basis as
expense in the period in which it arises and extra rupee liability corresponding to such foreign
exchange rate variation shall not be allowed against the hedged foreign debt.
To the extent the Transmission Licensee is not able to hedge the foreign exchange exposure, the extra
rupee liability towards interest payment and loan repayment corresponding to the normative
foreign currency loan in the relevant Year shall be permissible provided it is not attributable to
the Transmission Licensee or its suppliers or contractors.
The Transmission Licensee shall recover the cost of hedging and Foreign Exchange Rate Variation on
Year-to-Year basis as income or expense in the period in which it arises.
Application fee and the publication expenses
The application filing fee and the expenses incurred on publication of notices in the application for
approval of tariff, may in the discretion of the Commission, be allowed to be recovered by the
Transmission Licensee directly from the Beneficiaries.
35
Jharkhand Gazette (Extraordinary) Wednesday 15th October, 2025
Chapter IV:
PROCEDURE FOR FILING OF ARR and tariff
Multi Year Tariff filing procedure
The Multi Year Tariff filing shall be submitted as per the directions by the Commission in these
Regulations and in the manner as per the provisions of JSERC (Conduct of Business)
Regulations, 2024, as amended or replaced from time to time.
The TransmissionLicensee shall also submit the MYT filing in electronic format to the Commission.
The Transmission Licensee shall file the MYT Petition for the Control Period in accordance with the
MYT framework and the timelines specified in Section 0of these Regulations failing which:
(a) The Commission may issue the MYT order suo-motu;
(b) The Commission may disallow the return on equity to the TransmissionLicensee.
Before the Start of the Control Period
The Transmission Licensee shall file for the Commission’s approval as per the timelines specified in
Section 0of these Regulations, a Business Plan and MYT Petition in accordance with Clause0to
0of these Regulations.
Annual Filings for the Control Period
The Transmission Licensee shall submit periodic returns as may be specified, containing operational and
cost data to enable the Commission to monitor the implementation of its MYT order vide its
Annual Filings as perthe timelines specified in Section 0of these Regulations.
The Transmission Licensee shall submit to the Commission annual statements of its performance and
accounts including latest report of audited accounts.
Disposal of Application
The Commission shall process the filings made by the Transmission Licensee in accordance with these
Regulations and JSERC (Conduct of Business) Regulations, 2024 and its amendments thereof.
Based on the Transmission Licensee’s filings, objections/ suggestions from public and other
stakeholders, the Commission may accept the application with such modifications and/or such
conditions as may be deemed just and appropriate and issue, within 120 days of the receipt of the
application and after considering all suggestions and objections from public and other
stakeholders, an Order containing inter alia, trued up cost components for the year preceding the
base year, estimation of parameters for the Base Year and determination of ARR &Transmission
Tariff for each year of the Control Period. The Order shall also contain the approved Business
Plan and targets for controllable items for the Control Period.
36
Jharkhand Gazette (Extraordinary) Wednesday 15th October, 2025
Periodic Reviews
Review during Control Period
To ensure smooth implementation of the Multi Year Tariff (MYT) framework, the Commission may
undertake periodic reviews of Transmission Licensee’s performance during the Control Period,
to address any practical issues, concerns or unexpected outcomes that may arise.
The Transmission Licensee shall submit information as part of annual performance review on actual
performance as per the timelines specified in Section 0of these Regulations to assess the
performance vis-à-vis the targets approved by the Commission at the beginning of the Control
Period. This shall include annual statements of its performance and accounting statements and
the tariff worked out in accordance with these Regulations.
The TransmissionLicensee shall also submit the True up of ARR and corresponding tariff adjustments
as per the timelines specified in the Section 0of these Regulations. The revised estimates shall be
required to true-up the costs on account of uncontrollable variations, profit sharing mechanism
for exceeding the targets, and implementation of performance framework for quality of
Transmission targets.
The Commission may also specify any modifications to the forecast of the TransmissionLicensee for the
remainder of the Control Period, with detailed reasons for the same.
Review at the end of the Control Period
Towards the end of the Control Period, the Commission shall seek to review if the implementation of
the principles laid down in these Regulations has achieved their intended objectives. While
doing this, the Commission shall take into account, among other things, the industry structure,
sector requirements, consumer and other stakeholder expectations and Applicant’s requirements
at that point in time. Depending on the requirements of the sector to meet the objective of the
Act, the Commission may revise the principles for the next Control Period.
The end of the first Control Period shall be the beginning of the second Control Period and the
Transmission Licensee shall follow the same procedure unless required otherwise by the
Commission.
The Commission shall analyse the performance of the Transmission Licensee with respect to the targets
set out at the beginning of the ensuing Control Period and based on the actual performance,
expected efficiency improvements and other factors prevalent, determine the initial values for
the next Control Period.
37
Jharkhand Gazette (Extraordinary) Wednesday 15th October, 2025
Chapter V:
Miscellaneous Provisions
Issue of Orders and Practice Directions
Subject to the provision of the Act and these Regulations, the Commission may, from time to time, issue
Orders and Practice Directions in regard to the implementation of these Regulations and
procedure to be followed on various matters, which the Commission has been empowered by
these Regulations to direct, and matters incidental or ancillary thereto.
Notwithstanding anything contained in these Regulations, the Commission shall have the authority,
either suo-motu or on a Petition filed by any interested or affected party, to determine the tariff
of any Applicant.
Non-Compliance of Directions
15.1
State Load Despatch Centre may give such directions and exercise such supervision and control
as may be required for ensuring integrated operation of the power system for achieving
maximum economy and efficiency and every Licensee, Generating Company, sub-station and
any other person connected with the operation of the power system shall comply with such
directions.
15.2
If any Transmission Licensee fails to comply with the directions issued, it shall be liable to a
penalty as per Section 146 of the Electricity Act 2003.
Dispute Resolution
In case of dispute, any of the parties may make an application in accordance with the JSERC (Conduct
of Business) Regulations, 2024, as amended from time to time, including statutory re-enactment
thereof, for settlement of the dispute.
Power to Remove Difficulties
In case of any difficulty in giving effect to any of the provisions of this Regulation, the Commission
may by general or special order, issue appropriate directions to Transmission Licensee(s), to take
suitable action, not being inconsistent with the provisions of the Act, which appear to the
Commission to be necessary or expedient for the purpose of removing the difficulty.
The TransmissionLicensees may make an application to the Commission and seek suitable orders to
remove any difficulties that may arise in implementation of these Regulations.
Power of Relaxation
The Commission may in public interest and for reasons to be recorded in writing, relax any of the
provision of these Regulations.
38
Jharkhand Gazette (Extraordinary) Wednesday 15th October, 2025
Interpretation
If a question arises relating to the interpretation of any provision of these Regulations, the decision of
the Commission shall be final.
Saving of Inherent Powers of The Commission
Nothing contained in these Regulations shall limit or otherwise affect the inherent powers of the
Commission from adopting a procedure, which is at variance with any of the provisions of these
Regulations, if the Commission, in view of the special circumstances of the matter or class of
matters and for reasons to be recorded in writing, deems it necessary or expedient to depart from
the procedure specified in these Regulations.
Enquiry and Investigation
All enquiries, investigations and adjudications under these Regulations shall be done by the
Commission through the proceedings in accordance with the provisions of the JSERC (Conduct
of Business) Regulations, 2024, as amended from time to time.
Power to Amend
The Commission may from time to time add, vary, alter, suspend, modify, amend or repeal any
provisions of these Regulations.
Savings
Nothing in these Regulations shall be deemed to limit or otherwise affect the inherent power of the
Commission to make such orders as may be necessary to meet the ends of justice or to prevent
abuses of the process of the Commission.
Nothing in these Regulations shall bar the Commission from adopting in conformity with the provisions
of the Act a procedure, which is at variance with any of the provisions of these Regulations, if
the Commission, in view of the special circumstances of a matter or class of matters and for
reasons to be recorded in writing, deems it necessary or expedient for dealing with such a matter
or class of matters.
Nothing in these Regulations shall, expressly or impliedly, bar the Commission dealing with any matter
or exercising any power under the Act for which no Regulations or Regulations have been
framed, and the Commission may deal with such matters, powers and functions in a manner it
thinks fit.
39
Jharkhand Gazette (Extraordinary) Wednesday 15th October, 2025
Summary of Timelines
S. No.
Description
Filing of the
Petition by
Furnishing
additional
information as
sought by the
Commission
Disposal of the
Petition
1.
Business Plan for the Control
Period and MYT Petition for
the Control Period for FY
2025-26 to FY 2030-31 with
Transmission Tariff for each
year of the Control Period
November 30,
2025
Within 15 days of
issuance of letter
regarding
the
information
required
Within
120days
of acceptance of
the filing
2.
True Up for the Previous Year,
Annual Performance Review
for the current year and ARR
&Transmission Tariff for next
year of the Control Period
November
30
of the financial
year for which
APR has been
sought for
Within 15 days of
issuance of letter
regarding
the
information
required.
Within 120 days
of acceptance of
the filing
40
Jharkhand Gazette (Extraordinary) Wednesday 15th October, 2025
Appendix-I: Depreciation Schedule
Asset Description
Straight Line Depreciation (%)
Land owned under full ownership
0.00
Land under lease
For investment in land
2.67
For cost of clearing site
2.67
Assets Purchased New:
Building & Civil Engineering works
Offices & showrooms
2.67
Temporary erection such as wooden structures
100.00
Roads other than kutcha roads
2.67
Others
2.67
Transformers, kiosk sub-station equipment & other fixed apparatus (including
plant foundations)
Transformers including foundations having a rating of 100 kVA and over
4.22
Others
4.22
Switchgear, including cable connections
4.22
Lightning arrestors
Station type
4.22
Pole type
4.22
Synchronous condenser
4.22
Batteries
12.77
Underground cable including joint boxes and disconnected boxes
4.22
Cable &duct system
4.22
Overhead lines including cable support
Lines on fabricated steel operating at terminals voltages higher than 66 kV
4.22
Lines on steel supports operating at terminal voltages higher than 13.2 kV but
not exceeding 66 kV
4.22
Lines on steel or reinforced concrete supports
4.22
Lines on treated wood supports
4.22
Meters
12.77
Self-propelled vehicles
12.77
Air conditioning plants
Static
4.22
Portable
7.60
Furniture & Furnishing
Office furniture and furnishings
6.33
Office equipment
6.33
Internal wirings including fittings and apparatus
6.33
Street Light fittings
6.33
Apparatus let on hire
Other than motors
7.60
Motors
4.22
Communication equipment
Radio and higher frequency carrier systems
6.33
41
Jharkhand Gazette (Extraordinary) Wednesday 15th October, 2025
Asset Description
Straight Line Depreciation (%)
Telephone lines and telephones
6.33
IT Equipment and Software
15.00
Any other assets not covered above
4.22(or as approved by the
Commission considering asset
life and residual value)
42
Jharkhand Gazette (Extraordinary) Wednesday 15th October, 2025
Appendix-II: Procedure for Calculation of Transmission
System Availability Factor for a Month
1. Transmission System Availability factor for nth calendar month (TAFM) shall be calculated by the respective
Transmission Licensee, got verified and certified by the SLDC and separately for each AC and HVDC
transmission system and grouped according to sharing of transmission charges. For the purpose of
calculation of TAFM:
(i)
AC transmission lines: Each circuit of AC transmission line shall be considered as one element:
(ii)
Inter-Connecting Transformers (ICTs)/Transformer: Each ICT bank/Transformer (three single
phase transformers together) shall form one element
(iii)
Static VAR Compensator (SVC): SVC along with SVC transformer shall form one element.
(iv)
Bus Reactors/Switchable line reactors: Each Bus Reactors/Switchable line reactors shall be
considered as one element.
(v)
HVDC Bi-pole links: Each pole of HVDC link along with associated equipment at both ends shall be
considered as one element.
(vi)
HVDC back-to-back station: Each block of HVDC back-to-back station shall be considered as one
element. If associated AC line (necessary for transfer of interregional power through HVDC back-
to-back station) is not available, the HVDC back-to-back station block shall also be considered as
unavailable.
(vii)
Static Synchronous Compensation (“STATCOM”): Each STATCOM shall be considered as separate
element
2. The Availability of AC and HVDC portion of Transmission system shall be calculated as under:
% TAFM for AC System
[{(o xAVo)+(p xAVp)+ (q xAVq)+ (r xAVr)+ (u x AVu)} / (o + p + q + r + u)] x 100
Where
o
=
Total number of AC lines.
AVo =
Availability of o number of AC lines.
p
=
Total number of bus reactors/switchable line reactors
AVp =
Availability of p number of bus reactors/switchable line reactors
q
=
Total number of ICTs/Transformer.
AVq =
Availability of q number of ICTs/Transformer.
r
=
Total number of SVCs.
AVr =
Availability of r number of SVCs.
43
Jharkhand Gazette (Extraordinary) Wednesday 15th October, 2025
u =
Total Number of STATCOM
AVu=
Availability of u number of STATCOMs
%TAFM for HVDC System:
Where
Cxbp(act)
=
Total actual operated capacity of xthHVDC pole
Cxbp
=
Total rated capacity of xth HVDC pole
AVxbp
=
Availability of Xth HVDC pole
Cybtb(act) =
Total actual operated capacity of ythHVDC back-to-back station block
Cybtb
=
Total rated capacity of yth HVDC back-to-back station block
AVybtb
=
Availability of yth HVDC back-to-back station block
s
=
Total no of HVDC poles
t
=
Total no of HVDC Back to Back blocks
3. The availability for each category of transmission elements shall be calculated based on the weighted factor,
total hours under consideration and non-available hours for each element of that category. The calculation
of Availability of each category of the transmission elements are as per Appendix III. The weightage factor
for each category of transmission elements shall be as under:
a. For each circuit of AC line – Number of sub-conductors in the line multiplied by ckt-km;
b. For each HVDC pole – The rated MW capacity x ckt-km
c. For each ICT bank/Transformer – The rated MVA capacity
d. For SVC- The rated MVAR capacity (inductive and capacitive)
e. For Bus Reactor/switchable line reactors – The rated MVAR capacity.
f. For HVDC back-to-back station connecting two Regional grids- Rated MW capacity of each block.
4. The transmission elements under outage due to following reasons shall be deemed to be available:
44
Jharkhand Gazette (Extraordinary) Wednesday 15th October, 2025
(a) Shut down availed for maintenance or construction of elements of another transmission
scheme. If the other transmission scheme belongs to the Transmission Licensee, the SLDC may
restrict the deemed availability period to that considered reasonable by him for the work
involved.
(b) Switching off of a transmission line to restrict over voltage and manual tripping of switched
reactors as per the directions of SLDC.
5. Outage time of transmission elements for the following contingencies shall be excluded from the total time
of the element under period of consideration.
(a) Outage of elements due to Force Majeure events such as war, strike, riot, floods, earthquake,
etc., beyond the control of the Transmission Licensee. However, onus of satisfying the SLDC that
element outage was due to aforesaid events and not due to design failure shall rest with the
Transmission Licensee. A reasonable restoration time for the element shall be considered by
SLDC and any additional time taken by the Transmission Licensee for restoration of the element
beyond the reasonable time shall be treated as outage time attributable to the Transmission
Licensee. SLDC may consult the Transmission Licensee or any expert for estimation of
reasonable restoration time. Circuits restored through ERS (Emergency Restoration System)
shall be considered as available.
(b) Outage caused by grid incident/disturbance not attributable to the Transmission Licensee, e.g.
faults in substation or bays owned by other agency causing outage of the Transmission
Licensee’s elements, and tripping of lines, ICTs, etc. due to grid disturbance. However, if the
element is not restored on receipt of direction from SLDC while normalizing the system
following grid incident/disturbance within reasonable time, the element will be considered not
available for the period of outage after issuance of SLDC’s direction for restoration.
6. Time frame for certification of transmission system availability: Following schedule shall be followed for
certification of availability by SLDC:
Submission of outage data by Transmission Licensees to SLDC- By 5th of the following month;
Review of the outage data by SLDC – By 20th of the month;
Issue of availability certificate by SLDC- By 3rd of the next Month.
45
Jharkhand Gazette (Extraordinary) Wednesday 15th October, 2025
Appendix III: Formulae for calculation of availability of each category of transmission elements
Where,
o
=
Total number of AC lines;
AVo
=
Availability of o number of AC lines;
p
= Total number of bus reactors/switchable line reactors;
AVp
= Availability of p number of bus reactors/switchable line reactors;
q
=
Total number of ICTs/Transformer;
AVq
=
Availability of q number of ICTs/Transformer;
r
=
Total number of SVCs;
AVr
=
Availability of r number of SVCs;
U
=
Total number of STATCOM;
AVu
=
Availability of u number of STATCOMs;
Wi
=
Weightage factor for ith transmission line;
Wk
=
Weightage factor for kth ICT/Transformer;
Wl
= Weightage factors for inductive & capacitive operation of lth SVC;
/
Transformer
46
Jharkhand Gazette (Extraordinary) Wednesday 15th October, 2025
Wm
=
Weightage factor for mth bus reactor;
Wn
=
Weightage factor for nth STATCOM.
Ti,, Tk, Tl,
Tm, Tn, Tx, Ty
The total hours of ithAC line, kthICT/Transformer, lthSVC, mthSwitched Bus ReactorTm, Tn, Tx,
Ty& nth STATCOM, xth HVDC pole, yth HVDC back-to-back blocks duringthe period under
consideration (excluding time period for outages notattributable to Transmission Licensee
for reasons given in Para 5of theprocedure)
TNAi, TNAk,
TNAl, TNAm,
TNAn, TNAx, TNAy
The non-availability hours (excluding the time period for outages notattributable to
Transmission Licensee taken as deemed availability asper Para 5 of the procedure) for ith AC
line, kth ICT/Transformer, lth SVC, mth SwitchedBus Reactor, nth STATCOM, xth HVDC pole and
ythHVDC back-to-backblock.
By Order of the Commission,
R.P.Nayak,
Secretary
Jharkhand State Electricity Regulatory Commission
-----------
Printed & Published by the Superintendent of Jharkhand Government Press, Doranda, Ranchi.
Jharkhand Gazette (Extraordinary) 473-- 50.