THE

JHARKHAND GAZETTE

EXTRAORDINARY

PUBLISHED BY AUTHORITY

23 AASHWIN 1947 (S)

RANCHI WEDNESDAY 15TH October, 2025

JHARKHAND STATE ELECTRICITY REGULATORY

COMMISSION

--------

NOTIFICATION

15th October, 2025

JSERC (Terms and Conditions for Determination of Transmission Tariff)

Regulations, 2025

Notification No.114--In exercise of powers conferred by sub section (1) of Section 181 and

clause (zd), (ze) and (zf) of sub-section (2) of Section 181, read with Sections 61, 62 and 86, of the

Electricity Act, 2003 (36 of 2003)and all other powers enabling it in that behalf, the Jharkhand State

Electricity Regulatory Commission, hereby makes the following Regulations. The Regulation is guided

by the principles contained in Sections 61 and 62 of the Act to encourage competition, efficiency,

economical use of resources, good performance and optimum investments by the Transmission

No. 473

2

Jharkhand Gazette (Extraordinary) Wednesday 15th October, 2025

Licensees within the State of Jharkhand and for determination of Multi-Year Tariff to be recovered

by the Transmission Licensees for the prudent expenses incurred towards providing reliable and

optimal transmission infrastructure for power supply to Distribution Licensees and Open Access

consumers within the State of Jharkhand.

CHAPTER I:

SCOPE, EXTENT AND DEFINITIONS

Short Title & Commencement

These Regulations shall be called the Draft Jharkhand State Electricity Regulatory

Commission (Terms and Conditions for Determination of Transmission Tariff)

Regulations, 2025.

These Regulations shall come into force for the period from April 1, 2026to March 31, 2031,

after its publication in the Official Gazette of the Government of Jharkhand and

unless reviewed earlier or extended by the Commission, shall remain in force upto

March 31, 2031.

These Regulations shall extend to the whole of the State of Jharkhand.

These Regulations shall supersede the Jharkhand State Electricity Regulatory Commission

(Terms & Conditions for Determination of Transmission Tariff) Regulations, 2020,

Jharkhand State Electricity Regulatory Commission (Terms& Conditions for

Determination of Transmission Tariff) Regulations, 2015, Jharkhand State Electricity

Regulatory Commission (Terms and Conditions for Determination of Transmission

Tariff) Regulations, 2010, Jharkhand State Electricity Regulatory Commission (Terms

and Conditions of Tariff determination, Multi-Year Tariff Framework) Regulations,

2007, read with all amendments thereto, as the case may be.

Explanation:-For all purpose including the review matters pertaining to period till

March 31, 2026, the issue related to determination of Aggregate Revenue

Requirement and Tariff shall be governed by the provisions of the Jharkhand State

Electricity Regulatory Commission (Terms & Conditions for Determination of

Transmission Tariff) Regulations, 2020,Jharkhand State Electricity Regulation

Commission (Terms and Conditions for Determination of Transmission Tariff)

Regulation, 2015 and Jharkhand State Electricity Regulatory Commission (Terms and

Conditions for determination of Transmission Tariff) Regulations, 2010,Jharkhand

State Electricity Regulatory Commission (Terms and Conditions of Tariff

determination, Multi-Year Tariff Framework) Regulations, 2007, including

amendment thereto, as may be applicable.

3

Jharkhand Gazette (Extraordinary) Wednesday 15th October, 2025

Scope of Regulations and Extent of Application

These Regulations shall be applicable for determination of Aggregate Revenue Requirement

and tariff for the intra-State transmission of electricity and apply to all the

Transmission Licensees in the State of Jharkhand.

These Regulations shall be applicable where the cost based/Aggregate Revenue Requirement

(ARR) based tariff is determined by the Commission:

Provided that these Regulations shall not be applicable where tariff has been

discovered through tariff based competitive bidding in accordance with the guidelines

issued by the Central Government and adopted by the Commission under Section 63

of the Act.

Definitions and Interpretation

In these Regulations, unless the context otherwise requires-

1.

‘Accounting Statement’ means for each financial year:

(i)

The Balance sheet, prepared in accordance with the form contained in The

Companies Act, 2013 and its predecessors, as applicable;

(ii)

Cash flow statement, prepared in accordance with the applicable Accounting

Standards of the Institute of Chartered Accountants of India;

(iii) Cost Accounting Records prescribed by the Central Government under section

148 of The Companies Act, 2013 and its predecessors, as applicable.

(iv) Notes on accounts thereto, and such other supporting statements and

information forming part of financial statements or as the Commission may

direct from time to time.

(v)

Profit and loss account, complying with the requirements contained in The

Companies Act, 2013 and its predecessors, as applicable;

(vi) Report of the Statutory Auditors, including any annexure and appendix thereto,

as applicable;

(vii) Any or all the formats as notified by the Commission under these regulations for

Tariff Regulation including Multi Year Tariff Regulations pertinent to the

relevant year.

4

Jharkhand Gazette (Extraordinary) Wednesday 15th October, 2025

(viii) Reconciliation Statement, duly certified by the statutory auditors, showing the

reconciliation between the total expenses, revenue, assets and liabilities, of the

entity as a Company and the expenses, revenue, assets and liabilities, separately

for each business regulated by the Commission and unregulated business

operations.

2.

‘Act’ means the Electricity Act, 2003 (36 of 2003), and subsequent

amendments thereof;

3.

‘Additional Capitalisation’ means the capital expenditure incurred and

capitalised or projected to be capitalised, after the date of commercial

operation of the project and admitted by the Commission after prudence

check, subject to provisions of Clause0of these Regulations;

4.

‘Aggregate Revenue Requirement’ or ‘ARR’ means application for each

financial year, the costs pertaining to the Licensed Business which are

admissible, in accordance with these Regulations, to be recovered in the form

of tariffs and charges as determined by the Commission;

5.

‘Allocation Statement’ means for each financial year a statement in respect

of each of the business (Transmission, SLDC, Other Business) of the

Transmission Licensee, showing the amounts of any revenue, cost, asset,

liability, reserve or provision, etc., which has been either:

(i)

Determined by apportionment or allocation between different

Businesses of the Transmission Licensee including the

Licensed Business, together with a description of the basis of

the apportionment or allocation; or

(ii)

Charged from or to each such Other Business together with a

description on the basis of that charge;

6.

‘Allotted Transmission Capacity’ means and includes the power transfer in

MW between the specified point(s) of injection and point(s) of drawl allowed

to a Long and Medium-Term Transmission Customer on the intra-State

transmission system under the normal circumstances and the expression

“allotment of capacity” shall be construed accordingly:

Provided that the Allotted Transmission Capacity to a Long-Term Transmission

Customer and Medium -Term Transmission Customer shall be sum of the

generating capacities allocated to the Long-Term Transmission Customer and

Medium-Term Transmission Customer respectively

5

Jharkhand Gazette (Extraordinary) Wednesday 15th October, 2025

7.

‘Applicant’ means a Transmission Licensee who has filed the Petition for

determination of transmission charge or a Petition for truing up or annual

performance review in accordance with the Act and these Regulations and

includes a Transmission Licensee whose tariff is subjected to review by the

Commission;

8.

‘Auditor’ means an auditor appointed by the Transmission Licensee, in

accordance with the provisions of the Companies Act, 2013,as amended from

time to time, or any other law for the time being in force;

9.

‘Availability’ in relation to a Transmission System for a given period shall

mean the time in hours during that period in which the Transmission System is

capable of transmitting electricity at its declared voltage to the delivery point

and shall be expressed in percentage of total hours in the given period;

10.

‘Bank Rate’ means the one-year Marginal Cost of Lending Rate (MCLR) of

the State Bank of India from time to time or any replacement thereof for the

time being in effect;

11.

‘Base Year’ means the Financial Year 2025-26 and used for the purposes of

these Regulations;

12.

‘Beneficiary(ies)’ shall mean Long-term, Medium-term or Short-term

Transmission Customers whose tariff is determined under these Regulations;

13.

‘Capital Cost’ means the capital cost as defined in Clauses0 and0 of these

Regulations;

14.

‘CERC’ or “Central Commission’ means the Central Electricity Regulatory

Commission;

15.

‘Change in Law’ means occurrence of any of the following events:

(i)

the enactment, bringing into effect or promulgation of any new Indian

Law; or

(ii)

adoption, amendment, modification, repeal or re-enactment of any

existing Indian law; or

(iii)

change in interpretation or application of any Indian law by a

competent court, Tribunal or Indian Governmental Instrumentality

which is the final authority under law for such interpretation or

application; or

6

Jharkhand Gazette (Extraordinary) Wednesday 15th October, 2025

(iv)

change by any competent statutory authority in any condition or

covenant of any consent, clearances or approval or licence available or

obtained for the project; or

(v)

coming into force or change in any bilateral or multilateral

agreement/treaty between the Government of India and any other

Sovereign Government having implication for the Transmission

Licensee regulated under these Regulations;

16.

‘Commission’ means the Jharkhand State Electricity Regulatory Commission

(JSERC);

17.

‘Conduct of Business Regulations’ means the JSERC (Conduct of Business)

Regulations2024, as amended from time to time;

18.

‘Control Period’ means a multi-year period fixed by the Commission, from

April 01, 2026 and up to March 31, 2031;

19.

‘Cut-off Date’ means March 31, of the year closing after two years of the year

of commercial operation of the project, and in case the project is declared

under commercial operation in the last quarter of financial year, the cut-off

date shall be March 31, of the year closing after three years of the year of

commercial operation:

Provided that the cut-off date may be extended by the Commission if it is

proved on the basis of documentary evidence that the capitalization could not

be made within the cut-off date for reasons beyond the control of the

Transmission Licensee

20.

‘Date of Commercial Operation’ or ‘COD’ means the date declared by the

Transmission Licensee from 00:00 hour of which an element of the

transmission system is in regular service after successful charging and trial

operation:

Provided that the transmission charge for the element shall be payable and its

availability shall be accounted for, from that date:

Provided further that in case an element of the transmission system is ready for

regular service but is prevented from providing such service for reasons not

attributable to the Transmission Licensee, its suppliers or contractors, the

Commission may approve the date of commercial operation prior to the

element coming into regular service;

7

Jharkhand Gazette (Extraordinary) Wednesday 15th October, 2025

21.

‘Day’ means the 24 hours period starting at 00:00 hour;

22.

‘De-capitalization’ for the purpose of the tariff under these Regulations,

means reduction in Gross Fixed Assets of the project corresponding to the

assets taken out of service;

23.

‘Deemed Transmission Licensee’ means a person/entity deemed to be a

Transmission Licensee under Section 14 of the Act;

24.

‘Distribution Licensee’ means a person who has been granted a Distribution

Licence under Section 14 of the Act and shall include a deemed Licensee;

25.

‘Expenditure Incurred’ means the fund, whether the equity or debt or both,

actually deployed and paid in cash or cash equivalent, for creation or

acquisition of a useful asset and does not include commitments or liabilities

for which no payment has been released;

26.

‘Existing Project’ means the project declared under commercial operation

from a date prior to April 01, 2026;

27.

‘Financial Year’ means a period commencing on April 01 of a calendar year

and ending on March 31 of the subsequent calendar year;

28.

‘Force Majeure Event’ means, with respect to any party, any event or

circumstance, or combination of events or circumstances, which is not within

the reasonable control of, and is not due to an act of omission or commission

of that party and which, by the exercise of reasonable care and diligence,

could not have been prevented; and, without limiting the generality of the

foregoing, shall include the following events or circumstances:

(i)

acts of God, including but not limited to lightning, storm, action of the

elements, earthquakes, flood, torrential rains, drought and natural

disaster or any acts of God beyond the control of any party or due to

any restraint of the State Govt. or Central Govt. or any other Statutory

Authority;

(ii)

strikes and industrial disturbances having a State-wide or extensive

impact in the area of supply of a Transmission Licensee, but excluding

strikes and industrial disturbances in the Transmission Licensee's own

organisation;

(iii)

acts of war, invasion, armed conflict or act of foreign enemy,

insurrections, riots, revolution, terrorist or military action;

8

Jharkhand Gazette (Extraordinary) Wednesday 15th October, 2025

(iv)

unavoidable accident, including but not limited to fire, explosion,

radioactive contamination and toxic chemical contamination;

(v)

any shutdown or interruption of the grid, which is required or directed

by the concerned Load Despatch Centre;

29.

‘Grid Code’ means the JSERC (Grid Code) Regulations, 2008, as amended or

replaced from time to time;

30.

‘Income from Other Business’ is the income received by the Transmission

Licensee other than from Tariff towards usage of assets and/or manpower

relating to regulated Business and shall exclude Non-Tariff Income;

31.

‘Licensee’ means a person who has been granted licence under Section 14 of

the Act and shall include deemed Licensee under the Act;

32.

‘Licensed Business’ means the functions and activities, which the Licensee is

required to undertake in terms of the Licence granted by the Commission or as

a deemed Licensee under the Act;

33.

‘Long-Term Transmission Customer’ means a person having a long-term

lien exceeding three years over an Inter/Intra-State Transmission System by

virtue of paying transmission charges and a Distribution Licensee shall

necessarily be a Long-Term user for which it will be required to enter into

appropriate agreement with the Transmission Licensee;

34.

‘Medium-Term Transmission Customer’ means a person having a Medium-

Term lien for means the period exceeding three months and up to three Years

over an inter / intra-State Transmission System by virtue of paying

transmission charges;

35.

‘Non-Tariff Income’ means net income relating to the Licensed Business

other than from tariff (Intra-State transmission of electricity), including but not

limited to profit derived from sale of scrap, rent of land or buildings, income

from investments, miscellaneous receipts, etc.;

36.

‘Other Business’ means any other business of the Transmission Licensee for

optimum utilisation of its assets within the meaning of Section 41 of the Act;

37.

‘Open Access Customer’ means any Licensee or Consumer or buyer or a

person engaged in generation who has been granted Open Access in

accordance with the JSERC (Terms and Conditions for Intra-State Open

Access) Regulations, 2016 as amended or replaced from time to time;

9

Jharkhand Gazette (Extraordinary) Wednesday 15th October, 2025

38.

‘Operation and Maintenance Expenses’ or ‘O&M Expenses’ means the

expenditure incurred for operation and maintenance of the project, or part

thereof, and includes the expenditure on manpower, repairs and maintenance,

spares, consumables, insurance and overheads;

39.

‘Original Project Cost’ means the capital expenditure incurred by the

Transmission Licensee, within the original scope of the project up to the cut-

off date as admitted by the Commission;

40.

‘Project’ means the transmission system;

41.

‘Prudence Check’ means scrutiny of reasonableness of any cost or

expenditure incurred or proposed to be incurred in accordance with these

Regulations by the Transmission Licensee;

42.

‘Rated Voltage’ means the manufacturer’s design voltage at which the

Transmission System is designed to operate and includes such lower voltage at

which any transmission line is charged or for the time being charged, in

consultation with Long Term Transmission Customers;

43.

‘Scheduled Commercial Operation Date’ or ‘SCOD’ shall mean the date(s)

of commercial operation of transmission system or element thereof and

associated communication system as indicated in the Investment Approval or

as agreed in transmission service agreement as the case may be, whichever is

earlier;

44.

‘Short-Term Transmission Customer’ in the context of usage of

Transmission System means a person having short-term lien for a period upto

three months over an inter / intra-State Transmission System by virtue of

paying transmission charges;

45.

‘Start Date or Zero Date’ means the date indicated in the Investment

Approval for commencement of implementation of the project and where no

such date has been indicated, the date of Investment Approval shall be deemed

to be Start Date or Zero Date;

46.

‘State’ means the Jharkhand State;

47.

‘State Load Despatch Centre’ or “SLDC’ means the centre established by

the State Government for purposes of exercising the powers and discharging

the functions under Section 31 of the Act;

10

Jharkhand Gazette (Extraordinary) Wednesday 15th October, 2025

48.

‘Statutory Charges’ comprises taxes, cess, duties, royalties and other charges

levied through Acts of the Parliament or State Legislatures or by Indian

Government Instrumentality under relevant statutes;

49.

‘Tariff Period’ shall mean the period from April 01, 2026 to March 31, 2031

for which Tariff is determined by the Commission under these Regulations;

50.

‘Transmission Business’ means the business of transmission of electricity

bya Transmission Licensee to a Beneficiary and permitted Open Access

customers;

51.

‘Transmission Licensee’ means a Licensee authorized to establish or operate

Intra-State transmission lines;

52.

‘Transmission service agreement’ means the agreement, contract,

memorandum of understanding, or any such covenant, entered into between

the Transmission Licensee and the Long-Term Transmission Customer(s) for

the use of Transmission System;

53.

‘Transmission System’ means a line or a group of lines with or without

associated sub-station, equipment associated with transmission lines and sub-

stations identified under the scheme as per the Investment Approval(s) and

shall include associated communication system;

54.

‘Transmission System Availability Factor’ means Availability of the

Transmission System as certified by the State Load Despatch Centre;

55.

‘Useful life’ in relation to a unit of a Transmission System from the COD shall

mean 25 years for sub-station, 15 years for communication system and 35

years for transmission line;

56.

‘Year’ means financial year;

Words and expressions used in these Regulations and not defined herein but defined in the

Act shall have the meanings respectively assigned to them in the Act.

Reference to any Act, Rules and Regulations shall include amendment or consolidation or re-

enactment thereof.

All proceedings under these Regulations shall be governed by the JSERC (Conduct of

Business) Regulations, 2024, as amended or re-enacted from time to time.

11

Jharkhand Gazette (Extraordinary) Wednesday 15th October, 2025

Norms of Operation to be Ceiling Norms

For removal of doubts, it is clarified that the norms of operation specified under these

Regulations are the ceiling norms and this shall not preclude the Transmission

Licensee and Beneficiaries from agreeing to improved norms of operation and in such

case the improved norms shall be applicable for the determination of tariff.

CHAPTER II:

Tariff framework and guiding principles for multi year tariff (MYT)

Multi Year Tariff (MYT) Framework

The MYT Framework shall commence from April 01, 2026 and unless reviewed earlier or extended by

the Commission, shall be applicable till March 31, 2031. The ARR filings for the Control Period

shall be done in accordance with the MYT Framework contained in these Regulations.

The Transmission Licensees shall file MYT Application along with supporting documents before the

Commission as per the timelines specified in Section 0 of these Regulations.

The MYT Application shall include statements containing ARR along with its break up for the Years of

the previous Control Period based on the Audited Accounts for FY 2020-21 to FY2024-25,

revised estimate for Base Year FY 2025-26and the projections for each year of the Control

Period.

The Guiding Principles for MYT Framework are described in Section 0 of these Regulations.

The principles for determination of ARR for the Control Period are described in Chapter III of these

Regulations and the procedure for annual filing during the Control Period is described in

Chapter IV of these Regulations.

Guiding Principles for MYT Framework

The Commission shall adopt Multi Year Tariff Framework for approval of ARR and expected revenue

from tariffs and charges. The ARR and tariffs shall be determined for each year of the Control

Period.

The MultiYear Tariff framework shall be based on the following:

(a) Business Plan of the Transmission Licensee for the entire Control Period to be filed before

the Commission for approval along with MYT Petition, prior to the start of the Control

Period or within such period as the Commission may direct;

(b) The Transmission System or network usage forecast for each year of the Control Period,

consistent with the Business Plan;

(c) Proposals for transmission tariff design for each year of the Control Period, including the

losses to be charged and the procedure thereof;

(d) Transmission Licensee’s forecast of expected ARR for each year of the Control Period,

transmission tariff for each year of the Control Period, based on reasonable assumptions of

the underlying financial and operational parameters laid down under these Regulations, and

on the basis of the Business Plan;

(e) Trajectory for specific parameters shall be prescribed by the Commission, for improvement

through incentives and disincentives;

13

Jharkhand Gazette (Extraordinary) Wednesday 15th October, 2025

(f) Annual review of performance, which shall be conducted vis-à-vis the approved forecast and

categorization of variations in performance into controllable and uncontrollable factors; and

(g) Mechanism for sharing approved gains or losses on account of controllable and

uncontrollable factors.

I.

Determination of Baseline

The values for the Base Year of the Control Period shall be determined on the basis of audited accounts

available for FY 2020-21 to FY 2024-25. In the absence of audited accounts of any such year,

the Commission may consider best estimate for such years after carrying out due, prudence

check and after taking in account other factors as considered relevant by the Commission.

The Commission shall normally not revise the performance targets during the Control Period, unless the

Commission is of the view that there is a major variation in approved numbers vis-à-vis actuals.

II.

Business Plan

The Transmission Licensee shall file for the Commission’s approval, a Business Plan approved by an

authorised signatory, as per the timelines specified in Section 0 of these Regulations.

The Business Plan shall be for the entire Control Period and shall, inter-alia, contain:

(a) Capital Investment Plan: This should be commensurate with load growth and quality

improvement proposed in the Business Plan. The Capital Investment Plan should also

include corresponding capitalisation schedule and financing plan;

The Transmission Licensee shall also submit scheme-wise capital structure and cost of financing

(interest on debt) and return on equity, Grant, Deposit Works along with terms of the existing

loan agreements, etc., as a part of Capital Investment Plan;

(b) Operational Plan: Actual yearly Transmission Loss in the preceding Control Period along

with year wise projection of Transmission Loss for the next Control Period.

(c) Human Resource Plan with manpower planning including details of the estimated year

wise manpower addition and retirements for the Control Period to meet the growth in

demand;

(d) Target Performance: A set of targets proposed for other controllable items such as

transmission system availability, Transmission losses, return on equity, depreciation,

working capital requirement, performance targets, Employee, R&M and A&G Expenses etc.,

along with detailed break up and any other information used for preparing projections of

various performance parameters and other components during the Control Period. The targets

shall be consistent with the Capital Investment Plan proposed by the Transmission Licensee;

(e) Non- Tariff Income: Proposals for Non-Tariff Income with item-wise description and

details;

(f) Income from Other Business: Proposals in respect of income from Other Business; and

14

Jharkhand Gazette (Extraordinary) Wednesday 15th October, 2025

(g) Business Plan shall also contain the requisite information for the preceding Control Period:

Provided that requisite information for the preceding Control Period shall include year-wise

audited data on Scheme-wise capital investment, capacity enhancement plan, if any,

proposed efficiency improvements and its cost benefit analysis, quality improvement

measures undertaken, Employee Expenses, Repair & Maintenance Expenses and A&G

Expenses along with detailed break up and any other information used for preparing

projections of various performance parameters and other components during the Control

Period.

III.

Capital Investment Plan

The Transmission Licensee shall file for the Commission’s approval a Capital Investment Plan for the

entire Control Period along with the Business Plan planned in accordance with provisions stated

in the Grid Code. The Capital Investment Plan shall be prepared scheme-wise and each scheme

shall include:

1. Purpose of investment (e.g. replacement of existing assets, meeting load growth,

improvement in quality and reliability of supply, etc);

2. Approval of Competent Authority;

3. Detail Project Report& Load Flow Analysis;

4. Capital Structure;

5. Capitalization Schedule;

6. Implementation schedule including timelines;

7. Cost-benefit analysis and Rate reasonability;

8. Improvement in operational efficiency envisaged in the Control Period;

9. Ongoing schemes that will spill over into the year under review along with

justification;

10. New schemes that will commence during the Control Period but may be completed

within or beyond the Control Period.

The Commission shall approve the system augmentation plan submitted by the Transmission Licensee,

based on the load growth forecast during the Control Period. The same would be considered for

computation of ARR, wherein the amount of electricity transmitted by the Transmission System

shall be projected considering the estimated growth plan of its Beneficiaries and any plans of

new transmission system, based on network expansion plans within the State:

The Capital Investment Plan shall be in conformity with the plans made by the CEA/CTU and with the

Capital Investment Plans of the Distribution Licensees and the Generating Companies and shall

be developed as per the procedure specified in the Grid Code.

During the Annual Performance Review, the Commission shall monitor the year-wise progress of the

actual capital expenditure incurred by the Transmission Licensee vis-à-vis the approved capital

expenditure. The Transmission Licensees shall submit the actual capital expenditure incurred

along with the Annual Performance Review Filing.

15

Jharkhand Gazette (Extraordinary) Wednesday 15th October, 2025

The Commission shall review the actual capitalisation at the end of each year of the Control Period vis-

à-vis the approved capitalisation schedule and shall true up the ARR based on the actual

capitalisation for the year for which True up has been filed and also ARR components for the

year for which APR and Tariff has been sought.

In case the capital expenditure is required for emergency work, which has not been approved in the

Capital Investment Plan, the Transmission Licensee shall submit an application containing all

relevant information along with reasons justifying emergency nature of the proposed work

seeking approval by the Commission:

Provided that in case the capital expenditure is required for emergency work or

unforeseen situation to mitigate threat to life and property and if prior intimation thereof to the

Commission shall cause any irreparable loss or injury, the Transmission Licensee may undertake

such capital expenditure and submit the details for post-facto approval of the Commission along

with the next Tariff Petition with all the relevant details.

IV.

Controllable & Uncontrollable Parameters

The ‘Controllable Parameters’ shall comprise but not be limited to the following parameters, which are

within the control of, and are attributable to the applicant:

a) Transmission System Availability

b) Transmission losses

c) Capital expenditure and additional capitalization

d) Interest and finance charges

e) Return on equity

f) Depreciation

g) Interest on working capital

h) Operation and Maintenance expenses

The ‘Uncontrollable Parameters’ shall comprise but not be limited to the following factors, which are

beyond control the applicant:

a) Terminal Liabilities of Employees

b) Foreign Exchange Rate Variations

c) Taxes and duties

d) Non-Tariff Income and Income from Other Business

The variation on account of uncontrollable parameters shall be treated as a pass through to be ultimately

charged to the consumers, subject to prudence check and approval by the Commission.

16

Jharkhand Gazette (Extraordinary) Wednesday 15th October, 2025

The Commission shall also permit pass-through of variations in controllable items on account of Force

Majeure events and due to Change in Law event(s) in the ARR, based on the submission of

actual values by the Transmission Licensee and subsequent validation and approval by the

Commission.

The variation from targets specified by the Commission on account of controllable parameters shall be

subject to incentive and penalty framework, as detailed in the subsequent section.

V.

Incentive and Penalty Framework

The net savings due to refinancing of Loans by the Transmission Licensee shall be shared between the

Users and Transmission Licensee, as the case may be, in the ratio of 50:50.

The financial gains on account of Operations and Maintenance Expenses for Transmission Licensee

shall be shared in the ratio of 50:50 between the Transmission Licensee and beneficiaries at the

time of truing up.

The Transmission Licensee shall be entitled to incentive on achieving annual availability beyond the

target availability, in accordance with the mechanism specified in these Regulations.

Incase of any loss on account of underperformance with respect to the controllable parameters, the

Transmission Licensee shall bear the entire losses and no proportion of the losses shall be passed

on to the Users of the Transmission System.

Truing Up

The Transmission Licensee shall submit along with the application for truing up, details of capital

expenditure and additional capitalization, transformation and transmission losses, sources of

financing, depreciation, operation and maintenance expenditure, actual loan portfolio with the

interest paid, Return on equity, variation in working capital along with other components of

ARR, for each year of the Control Period, on the basis of annual Audited Accounts as per the

Timelines stipulated in the Section0.

Where after the truing up, the Revenue recovered exceeds the ARR approved by the Commission under

these Regulations, the Transmission Licensee shall refund to the Beneficiaries as the case may

be, the surplus amount so recovered as specified in Clause 0 of these Regulations.

Where after the truing up, the Revenue recovered is less than the ARR approved by the Commission

under these Regulations, the Transmission Licensee shall recover from the Beneficiaries as the

case may be, the gap amount in accordance with Clause 0 of these Regulations.

The amount under-recovered or over-recovered, along with simple interest at the rate equal to Bank Rate

as on April 01 of the respective year plus 200 basis points, shall be recovered or refunded by the

Transmission Licensee in six equal monthly instalments starting within three months from the

date of the Tariff Order issued by the Commission:

17

Jharkhand Gazette (Extraordinary) Wednesday 15th October, 2025

Provided that no carrying cost on the duration of delay shall be allowed on unrecovered

gap if the Transmission Licensee fails to submit the Petition as per the timelines stipulated in

Section 0:

Provided further that any adverse financial impact for variation in uncontrollable items

due to lapse on part of the Transmission Licensee or its suppliers/contractors shall not be

allowed in truing up;

Annual Performance Review (APR)

The Transmission Licensee shall file APR Petition for Annual Performance Review, along with details

of capital expenditure, additional capitalization, sources of financing, operations and

maintenance expenditure, actual loan portfolio with the interest paid along with other

components of ARR incurred/projected to be incurred for the year under review, as per the

timelines stipulated in the Section 0 of these Regulations.

The Transmission Licensee along with Annual Performance Review petition, shall also claim revised

ARR for the following year based on the truing up and annual performance review of previous

year(s).

The Scope of the Annual Performance Review shall be comparison of the approved expenses vis-à-vis

revised estimates for the year/s and shall comprise the following:

a) Comparison of Performance Targets vis-a-vis revised estimates based on the latest

actual data available;

b) Comparison of Approved Capital Expenditure and Capitalisation vis-à-vis revised

estimates by the Transmission Licensee based on the latest actual data available;

c) Comparison of Other Expenses such as Interest on Loan, Interest on Working

Capital, Return on Equity, Depreciation and O&M Expenses approved by the

Commission vis-à-vis the revised estimates by the Transmission Licensee based on

the latest actual data available;

d) Computation of the sharing of gains and losses on account of controllable factors.

e) Approved Revenue vis-à-vis revised estimates based on the latest actual data

available

f) Any other Expenses/Revenue impacting ARR

The Transmission Licensee may, as a result of additional information not previously known or available

to them at the time the forecast was developed, apply for a modification in the approved forecast

of ARR as part of the Annual Performance Review.

The Commission if, as a result of additional information not previously known or available to it at the

time the forecast was developed, is of the view that the same may result in significant over/under

recovery, either suo-motu or on an application made by any interested or affected party, modify

the approved forecast of ARR for the remainder of the Control Period, as part of the Annual

Performance Review.

18

Jharkhand Gazette (Extraordinary) Wednesday 15th October, 2025

Based on the analysis of Annual Performance Review and truing up, the Commission, shall revise the

ARR and Tariff for the ensuing year of the Control Period.

Chapter III:

Determination of ARR

Details for True-up, APR and determination of ARR & Tariff

The Transmission Licensee shall submit the details for True-up for the previous year, Annual

Performance Review for the current year and Tariff Determination for the ensuing year as per

the principles discussed in the subsequent Sections.

Principles for determination of ARR

The Transmission Business revenue requirement would be used for determining non-discriminatory

transmission charges.

Till such time there is a complete segregation of accounts between Transmission Business and SLDC

activity, the ARR for each Business shall be supported by an allocation statement duly approved

by the Board of the Transmission Licensee containing the apportionment of all costs, revenues,

assets, liabilities, reserves and provisions between the Transmission Business, SLDC activity

and any Other Business of the Transmission Licensee. The allocation statement shall also

contain the methodology used for the apportionment between different Businesses.

Calculation of ARR for Transmission Business during the

Control Period

The Aggregate Revenue Requirement for the Transmission Business of the Licensee, for each year of

the Control Period, shall comprise the following items:

a) Operation and Maintenance Expenses;

b) Return on Equity;

c) Interest on Working Capital;

d) Interest on Loans;

e) Interest on Security Deposit (if any);

f) Depreciation;

g) Income Tax;

h) Lease Charges;

i) Foreign Exchange Rate Variation;

j) Less: Non-Tariff Income;

k) Less: Income from Other Business.

Capital Cost

The capital cost admitted by the Commission after prudence check shall form the basis for

determination of tariff:

19

Jharkhand Gazette (Extraordinary) Wednesday 15th October, 2025

Provided that where the Commission has given ‘in principle’ approval to the estimates of

scheme capital cost and financing plan, the same shall be the guiding factor for applying

prudence check on the actual capital expenditure:

Provided further that in case of the existing schemes, the capital cost admitted by the

Commission prior to April 01, 2026 and the additional capital expenditure projected to be

incurred for respective year of the Control Period from FY 2026-27 to FY 2030-31 as may be

admitted by the Commission, shall form the basis for determination of capital cost.

Provided also that any increase in Capital Cost due to time/cost over-run shall only be

allowed in case the Transmission Licensee, establishes with the support of appropriate

documents and facts to the satisfaction of the Commission that the delay was on account of

uncontrollable factors and not attributable to the Transmission Licensee.

Capital cost to be allowed by the Commission for the purpose of determination of tariff will be based on

the Capital Investment Plan prepared by the Transmission Licensee and approved by the

Commission.

The amount of any contribution made by Beneficiary, distribution system users, Capital subsidy&

Grants towards work for connection to the transmission system of the Transmission Licensee

shall be deducted from the original cost of the scheme for the purpose of calculating the amount

under debt and equity under these Regulations.

Further, in case such cost has been incurred towards replacement or up gradation of any existing assets,

the original cost of the replaced asset shall be reduced and de-capitalized from the Capital Cost.

The capital cost of the Transmission Licensee shall includethe following:

(a)

the expenditure incurred or projected to be incurred on original scope of work, including

interest during construction and financing charges, any gain or loss on account of foreign

exchange risk variation during construction,on the actual loan up to the date of commercial

operation of the scheme, as admitted by the Commission, after prudence check shall form

the basis for determination of Tariff;

(b)

Interest during Construction (IDC)and financing charges, on the actual loans drawn;

(i)

Interest during construction (IDC) shall be computed corresponding to the loan from the

date of infusion of debt fund, and after taking into account the prudent phasing of funds

upto SCOD;

(ii)

In case of additional costs on account of IDC due to delay in achieving the SCOD, the

Transmission Licensee shall be required to furnish detailed justifications with supporting

documents for such delay including prudent phasing of funds:

Provided that if the delay is not attributable to the Transmission Licensee and is

due to uncontrollable factors as specified in Clause 0of these Regulations, IDC may be

allowed after due prudence check:

20

Jharkhand Gazette (Extraordinary) Wednesday 15th October, 2025

Provided further that if the delay in achieving the COD is attributable either in

entirety or in part to the Transmission Licensee or its contractor or supplier or agency, in

such cases, IDC beyond SCOD may be disallowed after prudence check either in entirety

or on pro-rata basis corresponding to the period of delay not condoned and the liquidated

damages, if any, recovered from the contractor or supplier or agency shall be retained by

the Transmission Licensee;

(c)

Incidental Expenditure during Construction (IEDC)as computed in accordance with these

Regulations;

(i)

Incidental expenditure during construction shall be computed from the zero date and after

taking into account pre-operative expenses up to SCOD:

Provided that any revenue earned during construction period up to SCOD on

account of interest on deposits or advances, or any other receipts may take into account

for reduction in incidental expenditure during construction;

(ii)

In case of additional costs on account of IEDC due to delay in achieving the SCOD, the

Transmission Licensee shall be required to furnish detailed justification with supporting

documents for such delay including the details of incidental expenditure during the period

of delay and liquidated damages recovered or recoverable corresponding to the delay:

Provided that if the delay is not attributable to the Transmission Licensee and is

due to uncontrollable factors as specified in Clause 0, IEDC may be allowed after due

prudence check:

Provided further that where the delay is attributable to an agency or contractor

or supplier engaged by the Transmission Licensee, the liquidated damages recovered

from such agency or contractor or supplier shall be taken into account for computation of

capital cost;

(iii) If the delay in achieving the COD is attributable either in entirety on in part to the

Transmission Licensee or its contractor or supplier or agency, in such cases, IEDC

beyond SCOD may be disallowed after prudence check either in entirety or on pro-rata

basis corresponding to the period of delay not condoned and the liquidated damages, if

any, recovered from the contractor or supplier or agency shall be retained by the

Transmission Licensee;

(d)

capitalized initial spares subject to the ceiling norms as percentage of plant and machinery

cost as under:

i.

Transmission line-

1.00%

ii.

Transmission substation(Green Field)-

4.00%

iii.

Transmission Substation (Brown Field) –

6.00%

iv.

Series compensation devices and HVDC Station-

4.00%

v.

Gas Insulated Sub-station (Green Field) –

5.00%

vi.

Gas Insulated Sub-station (Brown Field) –

7.00%

21

Jharkhand Gazette (Extraordinary) Wednesday 15th October, 2025

vii.

Communication System –

3.50%

viii.

Static Synchronous Compensation –

6.00%:

Provided that the Plant and Machinery cost shall be considered as the original project cost

excluding IDC, IEDC, Land Cost and Cost of Civil Works. The Transmission Licensee for the

purpose of estimating Plant and Machinery Cost, shall submit the break-up of head-wise IDC

and IEDC in its tariff application;

(e)

Additional capital expenditure determined under Clause0 of these Regulations:

Provided that the assets forming part of the Project, but not in use shall be taken out of the

capital cost;

(f)

In case any asset(s) have been replaced, the original value of such assets shall be de-

capitalised and reduced while approving the capitalisation for that year.

The following shall be excluded from the capital cost of the existing and new projects:

(a) The assets forming part of the project, but not in use;

(b) De-capitalised assets after the date of commercial operation on account ofreplacement or

removal on account of obsolescence.

Controllable and Uncontrollable factors

The following factors shall be considered as controllable and uncontrollable factors for deciding time

over-run, cost escalation, IDC and IEDC of the project.

The “controllable factors” shall include but shall not be limited to the following:-

1. Efficiency in the implementation of the project not involving approved change in scope of

such project, change in statutory levies or change in law or Force Majeure events; and

2. Delay in execution of the project on account of contractor or supplier or agency of the

Transmission Licensee except due to uncontrollable factors.

The “uncontrollable factors” shall include but shall not be limited to the following:-

1. Force Majeure events;

2. Change in law; and

3. Delay in Land acquisition, obtaining statutory approval and ROW Issues except where the

delay is attributable to the Transmission Licensee.

22

Jharkhand Gazette (Extraordinary) Wednesday 15th October, 2025

Additional Capitalisation

Additional Capitalisation within the original scope and upto the Cut-off date:

The additional capital expenditure in respect of a new project or an existing project incurred or

projected to be incurred, on the following counts within the original scope of work, after

the date of commercial operation and up to the cut-off date may be admitted by the

Commission, subject to prudence check:

a) Undischarged liabilities recognized to be payable at a future date;

b) Works deferred for execution;

c) Procurement of initial capital spares within the original scope of work, in accordance

with the provisions of Clause 10.6 (d) of these Regulations;

d) Liabilities to meet award of arbitration or for compliance of the order or directions

of any statutory authority, or order or decree of any court of law;

e) On account of Change in Law or compliance of any existing law; and

f) Capital Expenses incurred due to force majeure conditions.

Provided in case of any replacement/up-gradation of the assets, the additional

capitalization shall be worked out after adjusting the gross fixed assets and cumulative

depreciation of the assets replaced on account of de-capitalization;

The Transmission Licensee shall submit the details of works asset wise/work wise, included in

the original scope of work along with estimates of expenditure, liabilities recognized to

be payable at a future date and works deferred for execution along with the application

for determination of tariff.

Additional Capitalisation within original scope and after the cut-off date:

The additional capital expenditure incurred or projected to be incurred in respect of an existing

project or a new project on the following counts within the original scope of work and

after the cut-off date may be admitted by the Commission, subject to prudence check on

the following counts:

(i)

Liabilities to meet award of arbitration or for compliance of the order or

directions or order of any statutory authority, or order or decree of any court of

law;

(ii)

On account of Change in law;

(iii)

Liability of works executed prior to the cut-off date;

(iv)

Force Majeure events;

(v)

Liability for works admitted by the Commission after the cut-off date to the

extent of discharge of such liabilities by actual payments;

In case of replacement/up-gradation of assets deployed under the original scope of the existing

project after cut-off date, the additional capitalization may be admitted by the

Commission, after making necessary adjustments in the gross fixed assets and the

cumulative depreciation, subject to prudence check on the following grounds:

23

Jharkhand Gazette (Extraordinary) Wednesday 15th October, 2025

a) The useful life of the assets is not commensurate with the useful life of the project

and such assets have been fully depreciated in accordance with the provisions of

these Regulations;

b) The replacement of the asset or equipment is necessary on account of change in law

or Force Majeure conditions;

c) The replacement of such asset or equipment is necessary on account of obsolescence

of technology; and

d) The replacement of such asset or equipment has otherwise been allowed by the

Commission.

Additional Capitalisation beyond the original scope:

The capital expenditure, in respect of existing transmission system including communication

system, incurred or projected to be incurred on the following counts beyond the original

scope, may be admitted by the Commission, subject to prudence check:

(i)

Liabilities to meet award of arbitration or for compliance of order or directions

of any statutory authority, or order or decree of any court of law;

(ii)

Change in law or compliance of any existing law;

(iii)

Force Majeure events;

(iv)

Need for higher security and safety of the plant as advised or directed by

appropriate Indian Government Instrumentality or statutory authorities

responsible for national or internal security;

In case of de-capitalisation of assets of a Transmission Licensee, the original cost of such asset

as on the date of decapitalisation duly certified by its Statutory Auditor shall be deducted

from the value of gross fixed asset and corresponding outstanding loan on such assets as

well as equity shall be deducted from loan and the equity balances respectively. Such

deduction shall be carried out in the year such de-capitalisation takes place with

corresponding adjustments in cumulative depreciation and cumulative repayment of loan

shall be carried out, duly taking into consideration the year in which it was capitalised.

Impact of additional capitalisation within the approved scheme cost on tariff shall be considered by the

Commission during the Annual Performance Review.

Provided that the Commission may consider any new scheme proposed on merits subject to

prudence check as per this Tariff Regulation.

Additional Capitalisation on account of Renovation and Modernisation:

The Transmission Licensee, intending to undertake renovation and modernization of the

transmission system or element thereof for the purpose of extension of life beyond the

originally recognised useful life for the purpose of tariff, shall file a Petition before the

Commission for approval of the proposal with a Detailed Project Report giving complete

scope, justification, cost-benefit analysis, load flow analysis, rate reasonability, estimated

life extension from a reference date, financial package, phasing of expenditure, schedule

of completion, reference price level, estimated completion cost including foreign

24

Jharkhand Gazette (Extraordinary) Wednesday 15th October, 2025

exchange component, if any, and any other information considered to be relevant by the

Transmission Licensee:

Provided that the Transmission Licensee intending to undertake renovation and

modernization shall be required to obtain the consent of the beneficiaries or the long-term

customers, as the case may be, for such renovation and modernization and submit the

same along with the Petition.

Where the Transmission Licensee, makes an application for approval of its proposal for

renovation and modernisation, approval may be granted after due consideration of

reasonableness of the proposed cost estimates, load flow analysis, financing plan,

schedule of completion, interest during construction, use of efficient technology, cost-

benefit analysis, expected duration of life extension, consent of the beneficiaries or long

term customers, if obtained, and such other factors as may be considered relevant by the

Commission.

After completion of the renovation and modernisation, the Transmission Licensee shall file a

Petition for determination of tariff. Expenditure incurred or projected to be incurred and

admitted by the Commission after prudence check, and after deducting the accumulated

depreciation already recovered from the admitted project cost, shall form the basis for

determination of tariff.

Operation and Maintenance (O&M) expenses

Operation and Maintenance (O&M) expenses shall comprise the following:

(a) Salaries, wages, pension contribution and other employee costs;

(b) Administrative and General costs;

(c) Repairs and maintenance (O&M) expenses;

The O&M expenses for the Base Year of the Control Period shall be approved by the Commission

taking into account the audited accounts of FY 2020-21 to FY 2024-25, Business Plan filed by

the Transmission Licensees, estimates of the actuals for the Base Year, prudence check and any

other factor considered appropriate by the Commission.

O&M expenses permissible towards ARR for each year of the Control Period shall be determined using

the formula detailed below:

O&Mn = (R&Mn + EMPn + A&Gn) + Terminal liabilities;

Where,

R&Mn – Repair and Maintenance Costs of the TransmissionLicensee for the nth year;

A&Gn – Administrative and General Costs of the TransmissionLicensee for the nth year;

EMPn – Employee Costs of the TransmissionLicensee for the nth year excluding terminal

liabilities.

25

Jharkhand Gazette (Extraordinary) Wednesday 15th October, 2025

The above components shall be computed in the manner specified below:

R&Mn= K*GFA*(INDXn/INDX0)

Where

“K’ is constant (expressed in %) governing the relationship between R&M costs

and Gross Fixed Assets (GFA) and shall be calculated based on the % of R&M to

GFA of the preceding years of the Base Year in the MYT Order after normalising

any abnormal expenses;

‘GFA’ is opening value of the gross fixed asset of the nth year;

INDXn is the indexation for nth year of control period;

INDXo is the indexation for the base year of the control period;

EMPn+ A&Gn= [(EMPn-1)* (1+Gn)+ (A&Gn-1)] *(INDXn/INDXn-1)

Where,

EMPn-1 – Employee Costs of the TransmissionLicensee for the (n-1)th year

excluding terminal liabilities;

A&Gn-1 – Administrative and General Costs of the TransmissionLicensee for the

(n-1)th year excluding legal/litigation expenses;

INDXn– Inflation Factor to be used for indexing the employee cost and A&G

cost. This will be a combination of the Consumer Price Index (CPI) and the

Wholesale Price Index (WPI) for immediately preceding year before the base

year;

Gn– is a growth factor for the nth year and it can be greater than or lesser than

zero based on the actual performance. Value of Gn shall be determined by the

Commission in the MYT Order for meeting the additional manpower requirement

based on the Transmission Licensee’s Filing, benchmarking and any other factor

that the Commission feels appropriate;

INDXn = 0.55*CPIn + 0.45*WPIn

Note 1: For the purpose of estimation, the same INDX n/INDXn-1value shall be used for all years of the

Control Period. However, the Commission will consider the actual values in the INDX n/INDXn-

1 at the end of each year during the Annual Performance Review exercise and true up the

employee cost and A&G expenses on account of this variation, for the Control Period;

Note 2: Any variation due to changes recommended by the Pay Commission or wage revision

agreement, etc., will be considered separately by the Commission;

Note 3: Terminal Liabilities will be approved as per actual submitted by the TransmissionLicensee or be

established through actuarial studies.

26

Jharkhand Gazette (Extraordinary) Wednesday 15th October, 2025

The Petitioner, in addition to the above details shall also submit the detailed break-up of the

Legal/Litigation Expenses for the previous Years (FY 2021-22 to FY 2025-26) along with the

details and documentary evidence of incurring such expenses. The Commission shallapprove the

legal expenses as per the relevant provisions of the Jharkhand State Litigation Policy based on

the necessary documentary evidence submitted for the Control Period and shall carry out due

prudence check of legal expensesat the time of truing up.

Debt-Equity Ratio

Existing Schemes - In case of capital expenditure schemes capitalized prior to April 01, 2026, the debt-

equity ratio allowed by the Commission for determination of tariff for the period ending March

31, 2026 shall be considered.

New Scheme – For capital expenditure scheme capitalized on or after April 01,2026;

A normative debt-equity ratio of 70:30 shall be considered for the purpose of determination of

Tariff;

In case the actual equity employed is in excess of 30%, the amount of equity for the purpose of

tariff determination shall be limited to 30%, and the balance amount shall be considered

as normative loan;

In case the actual equity employed is less than 30%, the actual debt-equity ratio shall be

considered;

The premium, if any raised by the Transmission Licensee while issuing share capital and

investment of internal accruals created out of free reserve, shall also be reckoned as paid

up capital for the purpose of computing return on equity, provided such premium amount

and internal accruals are actually utilized for meeting capital expenditure.

Note 1: Any expenditure admitted on account of committed liabilities within the original scope

of work and the expenditure deferred on techno-economic grounds but falling within the original

scope of work shall be serviced in the normative debt-equity ratio specified in these Regulations;

Note 2: Any expenditure on replacement of old assets or on renovation and modernization or life

extension shall be considered on normative debt-equity ratio specified in these Regulations after

writing off the entire book value of the original assets from the capital cost of the new asset;

Note 3: Any expenditure admitted by the Commission for determination of tariff on account of

new works not in the original scope of work shall be serviced in the normative debt-equity ratio

specified in these Regulations.

The Transmission Licensee shall submit the resolution of the Board of the Company or approval of the

competent authority in other cases regarding infusion of funds from internal resources in support

of the utilization made or proposed to be made to meet the capital expenditure of the

Transmission Licensee.

27

Jharkhand Gazette (Extraordinary) Wednesday 15th October, 2025

Return on Equity

The rate of return on equity shall be 14.00% (post-tax) for the Control Period.

Return on equity for each year shall be allowed on equity employed in assets in use considering the

following:

Equity employed in accordance with Clause 0of these Regulations on assets (in use) capitalised

as on the beginning of the year; and

50% of the equity projected to be employed in accordance with Clause0of these Regulations on

assets (in use) commissioned during the year.

Interest on Loan Capital

The loans arrived at in the manner indicated in Clauses0 and 0of these Regulations shall be considered

as gross normative loan for calculation of interest on loan.

The normative loan outstanding as on April 01, 2026shall be worked out by deducting the cumulative

repayment as admitted by the Commission up to March 31, 2026 from the gross normative loan.

The repayment for the year of the Control Period shall be deemed to be equal to the depreciation

allowed for that year.

In case of de-capitalization of assets, the repayment shall be adjusted by taking into account cumulative

repayment on a pro-rata basis and the adjustment should not exceed cumulative depreciation

recovered up to the date of de-capitalization of such assets.

Notwithstanding any moratorium period availed by the Transmission Licensee, the repayment of loan

shall be considered from the first year of commercial operation of the scheme.

The rate of interest shall be the weighted average rate of interest calculated on the basis of the actual

loan portfolio at the beginning of each Year applicable to the Transmission Licensee:

Provided that if there is no actual loan for a particular year but normative loan is still

outstanding, then the rate of interest shall be considered on normative basis and shall be equal to

the Bank Rate as on April 01 of the respective year of the Control Period plus 200 basis points.

The interest on loan shall be calculated on the normative average loan of the year by applying the

weighted average rate of interest.

The above interest computation shall exclude interest on loan amount, normative or otherwise, to the

extent of capital cost funded by Consumer Contribution, Grants or Deposit Works carried out by

Transmission Licensee.

The Transmission Licensee shall make every effort to re-finance the loan as long as it results in net

savings on interest and in that event the costs associated with such re-financing shall be borne by

the users and the net savings shall be shared between the users and the Transmission Licensee, in

the ratio of 50:50.

28

Jharkhand Gazette (Extraordinary) Wednesday 15th October, 2025

Depreciation

Depreciation shall be calculated for each year of the Tariff period, on the amount of Capital Cost of the

assets admitted by the Commission:

Provided that depreciation shall not be allowed on assets funded by contribution from

Beneficiary, Distribution system user, Capital Subsidy Grants. Provision for replacement of such

assets shall be made in the Capital Investment Plan.

Depreciation for each year shall be determined based on the methodology as specified in these

Regulations along with the rates and other terms specified in these Regulations.

Depreciation shall be calculated annually, based on the straight-line method at the rates specified at

Appendix-I. The base value for the purpose of depreciation shall be original cost of the asset:

Provided that the TransmissionLicensee shall ensure that once the individual asset is

depreciated to the extent of seventy (70) percent of the Book Value of the asset, remaining

depreciable value as on March 31 of the closing shall be spread over the balance useful life of

the asset.

Depreciation shall be charged from the first year of operation of the asset. In case, the operation of the

asset is for a part of the year, depreciation shall be charged on a pro-rata basis.

The residual value of assets shall be considered as 10% and depreciation shall be allowed to a maximum

of 90% of the original cost of the asset. Land is not a depreciable asset and its cost shall be

excluded while computing 90% of the original cost of the asset:

Provided that the salvage value for IT equipment and software shall be considered as NIL

and 100% value of the assets shall be considered depreciable.

The Commission may, in the absence of the Fixed Assets Register, calculate Depreciation (%) arrived

by dividing the Depreciation and the Average Gross Fixed Assets as per the latest available

Audited Accounts of theTransmission Licensee. The Depreciation (%) so arrived shall be

multiplied by the Average GFA approved by the Commission for the relevant Financial Year to

arrive at the Depreciation for that Financial Year.

In case of de-capitalization of assets, the cumulative depreciation shall be adjusted by taking into

account the depreciation recovered through tariff corresponding to the decapitalised asset during

its useful services.

Interest on Working Capital

Working Capital for the Transmission Licensee shall comprise:

(a) Maintenance spares @ 15% of the O&M expenses specified in Clauses 0- 0of these

Regulations;

(b) Receivables equivalent to 45 days of annual fixed cost;

29

Jharkhand Gazette (Extraordinary) Wednesday 15th October, 2025

(c) Operation and Maintenance expenses for one month;

(d) Less: Interest on amount, if any, held as security deposits from Transmission system users.

Rate of interest on working capital shall be equal to the Bank Rate as on September 30 of the financial

year in which the MYT Petition is filed plus 350 basis points. At the time of true up, the interest

rate shall be adjusted as per the actual rate prevailing on April 01 of the financial year for which

truing up exercise has been undertaken.

The interest on working capital shall be payable on normative basis notwithstanding that the

Transmission Licensee has not taken working capital loan from any outside agency.

Income Tax

Tax on income, if any, on the Licensed business of the TransmissionLicensee shall be limited to tax on

the allowed return on equity.

The income tax actually payable or paid limited to the tax on allowed return on equity shall be included

in the ARR while truing up. The actual assessment of income tax should take into account

benefits of tax holiday, and the credit for carry forward losses applicable as per the provisions of

the Income Tax Act, 1961 and its amendments thereof shall be passed on to the consumers. Tax

on the other income streams of the Transmission Licensee shall not be recovered from the

Beneficiaries.

Non-Tariff Income

The amount of Non-Tariff Income relating to the Transmission Business as approved by the

Commission in prudent, fair and just manner shall be deducted from the ARR in determining the

Tariff for Transmission Business:

Provided that the Transmission Licensee shall submit full details of its forecast of Non-

Tariff Income to the Commission in such form as may be stipulated by the Commission.

The Non-Tariff Income shall include:

Income from rent of land or buildings;

Income from sale of scrap;

Income from investments;

Interest accrued on advances to suppliers/contractors;

Interest income on loans / advances to employees;

Income from rental of staff quarters;

Income by rental from contractors;

Income by hire charges from contactors and others;

Income by supervision charges, etc.;

Supervision charges for capital works;

Income from advertisements;

30

Jharkhand Gazette (Extraordinary) Wednesday 15th October, 2025

Income from sale of tender documents;

Profit from sale of assets (i.e. difference in Sale Value and Book Value)

Any other Non-Tariff Income:

Provided that the interest earned from investments made out of Return on Equity

corresponding to the regulated Business of the Transmission Business shall not be included in

Non-Tariff Income.

Provided that the onus to substantiate, to the satisfaction of the Commission, that such

investments have been out of Return on Equity shall be on the Licensee.

Income from other Business of the Transmission Licensee

Where the Transmission Licensee is engaged in any Other Business utilising infrastructure and/or

manpower of regulated business by any means in accordance with Section 41 of the Electricity

Act, 2003, the income from such Business shall be calculated considering the following

conditions:

The TransmissionLicensee shall not in any manner utilize the assets and facilities of the

Licensed Business or otherwise directly or indirectly allow the activities to be undertaken

in a manner that it results in the Licensed Business subsidising the Other Business in any

manner;

The TransmissionLicensee shall not in any manner, directly or indirectly encumber the assets

and facilities of the Licensed Business for the Other Business or for any activities other

than the Licensed Business;

The TransmissionLicensee shall duly pay for all costs accounted for in the Licensed Business,

which have been incurred for Other Business and in the event of such cost being incurred

commonly for both the Licensed Business and Other Business, apportion such cost and

ensure due payment of apportioned costs to the Licensed Business from the Other

Business;

The revenue derived from the Other Business shall be commensurate with prevailing market

condition for such similar business activities;

In addition to the sharing of costs under sub-clause c) above, the TransmissionLicensee shall

account for and ensure due payment to the Licensed Business a certain proportion of

revenues from the other Business. As a general principle, the TransmissionLicensee shall

retain 50% of the revenues arising on account of Other Business and pass on the

remaining 50% of the revenues to the consumers.

The revenue from Other Business shall be deducted from the ARR in calculating the revenue

requirement of the TransmissionLicensee in a prudent, fair and just manner:

31

Jharkhand Gazette (Extraordinary) Wednesday 15th October, 2025

Provided that the TransmissionLicensee shall follow a reasonable basis for allocation of

all joint and common costs between the Transmission and the Other Business and shall submit

the Allocation Statement as approved by the Board of Directors to the Commission along with

his application for determination of tariff:

Provided further that where the sum total of the direct and indirect costs of such Other

Business exceeds the revenues from such Other Business, no amount shall be allowed to be

added to the ARR of the TransmissionLicensee on account of such Other Business.

Quality of Supply

The Commission shall monitor the following Quality of Supply parameters during the Control Period:

(a) Transmission System Availability;

(b) Transformer Failure across various capacities, represented by the number of transformer

failures as a percentage of the total number of transformers in that specified capacity within

the Transmission System, over a specified period of time.

The Transmission Licensee in its Business Plan filings shall submit and propose the trajectory for the

achievement of quality targets. The Commission will specify the targets for each parameter. The

Transmission Licensee shall submit its performance on each parameter in the form and manner

specified by the Commission.

Norms of operation

Normative Annual Transmission System Availability factor (NATSAF): for recovery of full

transmission charges shall be as under:

For recovery of Annual Fixed Charges:

AC system: 98.0% for the Control Period from FY 2026-27 to FY 2030-31;

HVDC bi-pole links: 95.0% for the Control Period from FY 2026-27 to FY 2030-31;

HVDC back-to-back stations: 95.0% for the Control Period FY 2027-31:

Provided that the normative annual transmission availability factor of the HVDC bi-pole links

shall be 85%for first twelve months from the date of commercial operation.

For incentive consideration:

AC system: 98.50% for the Control Period FY 2027-31;

HVDC bi-pole links: 95.0% for the Control Period FY 2027-31;

HVDC back-to-back stations: 95.0% for the Control Period FY 2027-31:

Provided that no incentive shall be payable for availability beyond 99.85%:

32

Jharkhand Gazette (Extraordinary) Wednesday 15th October, 2025

Provided further that for AC system, two trippings per year shall be allowed. After two

trippings in a year, additional 12 hours outage shall be considered in addition to the actual

outage:

Provided also that in case of outage of a transmission element affecting evacuation of power

from a generating station, outage hours shall be multiplied by a factor of 2.

Auxiliary Energy Consumption in the sub-station

AC System: The charges for auxiliary energy consumption in the AC sub-station for the purpose

of air-conditioning, lighting and consumption in other equipment shall be borne by the

Transmission Licensee and included in the normative operation and maintenance expenses.

Annual Transmission Charge

The Transmission Licensee shall be entitled to recover its Annual Transmission Charges (ATC) from

Beneficiaries as specified in Clauses 0 to 0 of these Regulations.

Recovery of Fixed Charges

The fixed cost of the Transmission System shall be computed on annual basis, in accordance with norms

contained in these Regulations, aggregated as appropriate, and recovered on monthly basis as

transmission charge from the users.

The transmission charge (inclusive of incentive) payable for a calendar month for a Transmission

System or part thereof shall be

a. For TAFM < 98%

AFC x (NDM/NDY) x (TAFM/98%)

b. For TAFM: 98%< TAFM < 98.5%

AFC x (NDM/NDY) x (1)

c. For TAFM: 98.5%< TAFM < 99.85%

AFC x (NDM/NDY) x (TAFM/98.5%)

d. For TAFM > 99.85%

AFC x (NDM/NDY) x (99.85%/98.5%)

Where,

AFC = Annual Fixed Cost specified for the year, in Rupees;

NDM = Number of days in the month;

NDY = Number of days in the year; and

33

Jharkhand Gazette (Extraordinary) Wednesday 15th October, 2025

TAFM = Transmission system availability factor for the month, in percent, computed in

accordance with Appendix –III to these Regulations.

The Transmission Licensee shall raise the bill for the transmission charge (inclusive of incentive) for a

month based on its estimate of TAFM. Adjustments, if any, shall be made on the basis of the

TAFM to be certified by the SLDC within 30 days from the last day of the relevant month.

Allocation of Annual Transmission Charge

The Annual Transmission Charge (ATC) shall be allocated as specified in Jharkhand State Electricity

Regulatory Commission (Framework for sharing of charges for Intra-State Transmission

System) Regulations, 2019 as amended or replaced from time to time.

Late Payment Surcharge

In case the payment of any bill for charges payable under these Regulations is delayed by a Consumer

beyond a period of 60 days from the date of billing, a late payment surcharge at the Bank Rate

as on April 01 of the respective year plus 200 basis points shall be applicable for the first month

and for every month or part thereof delay the rate shall increase by 50 basis points subject to a

maximum of Bank Rate as on April 01 of the respective year plus 500 basis point shall be levied

by the Transmission Licensee.

Provided that the rate of Late Payment Surcharge shall not exceed the rate specified in

the TSA entered between the Transmission Licensee and its Beneficiaries.

Rebate

For payment of bills of the Transmission Licensee within 5 days of presentation of bills by the

Transmission Licensee, a rebate of 2.00% shall be allowed.

Provided that if percentage of Rebate has been agreed between the Transmission

Licensee and Beneficiary/ies in TSA, the same shall be applicable.

Note: In case of computation of 5 days, the number of days shall be counted consecutively

without considering any holiday. However, in case the last day or 5th day is official holiday, the

5th day for the purpose of Rebate shall be construed as the immediate succeeding working day

(as per the official state Government’s calendar, where the office of the Authorized signatory or

Representative of the Beneficiary, for the purpose of receipt or acknowledgement of Bill is

situated.

Deviation from norms

The transmission charges by the Transmission Licensee may also be determined indeviation of the

norms specified in these Regulations subject to the conditions that-

34

Jharkhand Gazette (Extraordinary) Wednesday 15th October, 2025

(a) The levelized Tariff over the useful life of the Project, calculated based on the discounting

factor as notified by the CERC from time to time for the Projects under Section 63 of the

Act, on the basis of the norms in deviation does not exceed the levelized Tariff calculated

on the basis of the norms specified in these Regulations; and

(b) Any deviation shall come into effect only after approval by the Commission, for which an

application shall be made by the Transmission Licensee before filing tariff Petition / ARR

for determination of Tariff.

Lease charges

Lease charges for assets taken on lease by the Transmission Licensee shall be considered as per lease

agreement, provided they are considered reasonable by the Commission.

Foreign Exchange Rate Variation

The Transmission Licensee may hedge foreign exchange exposure in respect of the interest on foreign

currency loan and repayment of foreign loan acquired for the Transmission System, in part or

full at the discretion of the Transmission Licensee.

Every Transmission Licensee shall recover the cost of hedging of Foreign Exchange Rate Variation

corresponding to the normative foreign debt, in the relevant Year on Year-to-Year basis as

expense in the period in which it arises and extra rupee liability corresponding to such foreign

exchange rate variation shall not be allowed against the hedged foreign debt.

To the extent the Transmission Licensee is not able to hedge the foreign exchange exposure, the extra

rupee liability towards interest payment and loan repayment corresponding to the normative

foreign currency loan in the relevant Year shall be permissible provided it is not attributable to

the Transmission Licensee or its suppliers or contractors.

The Transmission Licensee shall recover the cost of hedging and Foreign Exchange Rate Variation on

Year-to-Year basis as income or expense in the period in which it arises.

Application fee and the publication expenses

The application filing fee and the expenses incurred on publication of notices in the application for

approval of tariff, may in the discretion of the Commission, be allowed to be recovered by the

Transmission Licensee directly from the Beneficiaries.

35

Jharkhand Gazette (Extraordinary) Wednesday 15th October, 2025

Chapter IV:

PROCEDURE FOR FILING OF ARR and tariff

Multi Year Tariff filing procedure

The Multi Year Tariff filing shall be submitted as per the directions by the Commission in these

Regulations and in the manner as per the provisions of JSERC (Conduct of Business)

Regulations, 2024, as amended or replaced from time to time.

The TransmissionLicensee shall also submit the MYT filing in electronic format to the Commission.

The Transmission Licensee shall file the MYT Petition for the Control Period in accordance with the

MYT framework and the timelines specified in Section 0of these Regulations failing which:

(a) The Commission may issue the MYT order suo-motu;

(b) The Commission may disallow the return on equity to the TransmissionLicensee.

Before the Start of the Control Period

The Transmission Licensee shall file for the Commission’s approval as per the timelines specified in

Section 0of these Regulations, a Business Plan and MYT Petition in accordance with Clause0to

0of these Regulations.

Annual Filings for the Control Period

The Transmission Licensee shall submit periodic returns as may be specified, containing operational and

cost data to enable the Commission to monitor the implementation of its MYT order vide its

Annual Filings as perthe timelines specified in Section 0of these Regulations.

The Transmission Licensee shall submit to the Commission annual statements of its performance and

accounts including latest report of audited accounts.

Disposal of Application

The Commission shall process the filings made by the Transmission Licensee in accordance with these

Regulations and JSERC (Conduct of Business) Regulations, 2024 and its amendments thereof.

Based on the Transmission Licensee’s filings, objections/ suggestions from public and other

stakeholders, the Commission may accept the application with such modifications and/or such

conditions as may be deemed just and appropriate and issue, within 120 days of the receipt of the

application and after considering all suggestions and objections from public and other

stakeholders, an Order containing inter alia, trued up cost components for the year preceding the

base year, estimation of parameters for the Base Year and determination of ARR &Transmission

Tariff for each year of the Control Period. The Order shall also contain the approved Business

Plan and targets for controllable items for the Control Period.

36

Jharkhand Gazette (Extraordinary) Wednesday 15th October, 2025

Periodic Reviews

Review during Control Period

To ensure smooth implementation of the Multi Year Tariff (MYT) framework, the Commission may

undertake periodic reviews of Transmission Licensee’s performance during the Control Period,

to address any practical issues, concerns or unexpected outcomes that may arise.

The Transmission Licensee shall submit information as part of annual performance review on actual

performance as per the timelines specified in Section 0of these Regulations to assess the

performance vis-à-vis the targets approved by the Commission at the beginning of the Control

Period. This shall include annual statements of its performance and accounting statements and

the tariff worked out in accordance with these Regulations.

The TransmissionLicensee shall also submit the True up of ARR and corresponding tariff adjustments

as per the timelines specified in the Section 0of these Regulations. The revised estimates shall be

required to true-up the costs on account of uncontrollable variations, profit sharing mechanism

for exceeding the targets, and implementation of performance framework for quality of

Transmission targets.

The Commission may also specify any modifications to the forecast of the TransmissionLicensee for the

remainder of the Control Period, with detailed reasons for the same.

Review at the end of the Control Period

Towards the end of the Control Period, the Commission shall seek to review if the implementation of

the principles laid down in these Regulations has achieved their intended objectives. While

doing this, the Commission shall take into account, among other things, the industry structure,

sector requirements, consumer and other stakeholder expectations and Applicant’s requirements

at that point in time. Depending on the requirements of the sector to meet the objective of the

Act, the Commission may revise the principles for the next Control Period.

The end of the first Control Period shall be the beginning of the second Control Period and the

Transmission Licensee shall follow the same procedure unless required otherwise by the

Commission.

The Commission shall analyse the performance of the Transmission Licensee with respect to the targets

set out at the beginning of the ensuing Control Period and based on the actual performance,

expected efficiency improvements and other factors prevalent, determine the initial values for

the next Control Period.

37

Jharkhand Gazette (Extraordinary) Wednesday 15th October, 2025

Chapter V:

Miscellaneous Provisions

Issue of Orders and Practice Directions

Subject to the provision of the Act and these Regulations, the Commission may, from time to time, issue

Orders and Practice Directions in regard to the implementation of these Regulations and

procedure to be followed on various matters, which the Commission has been empowered by

these Regulations to direct, and matters incidental or ancillary thereto.

Notwithstanding anything contained in these Regulations, the Commission shall have the authority,

either suo-motu or on a Petition filed by any interested or affected party, to determine the tariff

of any Applicant.

Non-Compliance of Directions

15.1

State Load Despatch Centre may give such directions and exercise such supervision and control

as may be required for ensuring integrated operation of the power system for achieving

maximum economy and efficiency and every Licensee, Generating Company, sub-station and

any other person connected with the operation of the power system shall comply with such

directions.

15.2

If any Transmission Licensee fails to comply with the directions issued, it shall be liable to a

penalty as per Section 146 of the Electricity Act 2003.

Dispute Resolution

In case of dispute, any of the parties may make an application in accordance with the JSERC (Conduct

of Business) Regulations, 2024, as amended from time to time, including statutory re-enactment

thereof, for settlement of the dispute.

Power to Remove Difficulties

In case of any difficulty in giving effect to any of the provisions of this Regulation, the Commission

may by general or special order, issue appropriate directions to Transmission Licensee(s), to take

suitable action, not being inconsistent with the provisions of the Act, which appear to the

Commission to be necessary or expedient for the purpose of removing the difficulty.

The TransmissionLicensees may make an application to the Commission and seek suitable orders to

remove any difficulties that may arise in implementation of these Regulations.

Power of Relaxation

The Commission may in public interest and for reasons to be recorded in writing, relax any of the

provision of these Regulations.

38

Jharkhand Gazette (Extraordinary) Wednesday 15th October, 2025

Interpretation

If a question arises relating to the interpretation of any provision of these Regulations, the decision of

the Commission shall be final.

Saving of Inherent Powers of The Commission

Nothing contained in these Regulations shall limit or otherwise affect the inherent powers of the

Commission from adopting a procedure, which is at variance with any of the provisions of these

Regulations, if the Commission, in view of the special circumstances of the matter or class of

matters and for reasons to be recorded in writing, deems it necessary or expedient to depart from

the procedure specified in these Regulations.

Enquiry and Investigation

All enquiries, investigations and adjudications under these Regulations shall be done by the

Commission through the proceedings in accordance with the provisions of the JSERC (Conduct

of Business) Regulations, 2024, as amended from time to time.

Power to Amend

The Commission may from time to time add, vary, alter, suspend, modify, amend or repeal any

provisions of these Regulations.

Savings

Nothing in these Regulations shall be deemed to limit or otherwise affect the inherent power of the

Commission to make such orders as may be necessary to meet the ends of justice or to prevent

abuses of the process of the Commission.

Nothing in these Regulations shall bar the Commission from adopting in conformity with the provisions

of the Act a procedure, which is at variance with any of the provisions of these Regulations, if

the Commission, in view of the special circumstances of a matter or class of matters and for

reasons to be recorded in writing, deems it necessary or expedient for dealing with such a matter

or class of matters.

Nothing in these Regulations shall, expressly or impliedly, bar the Commission dealing with any matter

or exercising any power under the Act for which no Regulations or Regulations have been

framed, and the Commission may deal with such matters, powers and functions in a manner it

thinks fit.

39

Jharkhand Gazette (Extraordinary) Wednesday 15th October, 2025

Summary of Timelines

S. No.

Description

Filing of the

Petition by

Furnishing

additional

information as

sought by the

Commission

Disposal of the

Petition

1.

Business Plan for the Control

Period and MYT Petition for

the Control Period for FY

2025-26 to FY 2030-31 with

Transmission Tariff for each

year of the Control Period

November 30,

2025

Within 15 days of

issuance of letter

regarding

the

information

required

Within

120days

of acceptance of

the filing

2.

True Up for the Previous Year,

Annual Performance Review

for the current year and ARR

&Transmission Tariff for next

year of the Control Period

November

30

of the financial

year for which

APR has been

sought for

Within 15 days of

issuance of letter

regarding

the

information

required.

Within 120 days

of acceptance of

the filing

40

Jharkhand Gazette (Extraordinary) Wednesday 15th October, 2025

Appendix-I: Depreciation Schedule

Asset Description

Straight Line Depreciation (%)

Land owned under full ownership

0.00

Land under lease

For investment in land

2.67

For cost of clearing site

2.67

Assets Purchased New:

Building & Civil Engineering works

Offices & showrooms

2.67

Temporary erection such as wooden structures

100.00

Roads other than kutcha roads

2.67

Others

2.67

Transformers, kiosk sub-station equipment & other fixed apparatus (including

plant foundations)

Transformers including foundations having a rating of 100 kVA and over

4.22

Others

4.22

Switchgear, including cable connections

4.22

Lightning arrestors

Station type

4.22

Pole type

4.22

Synchronous condenser

4.22

Batteries

12.77

Underground cable including joint boxes and disconnected boxes

4.22

Cable &duct system

4.22

Overhead lines including cable support

Lines on fabricated steel operating at terminals voltages higher than 66 kV

4.22

Lines on steel supports operating at terminal voltages higher than 13.2 kV but

not exceeding 66 kV

4.22

Lines on steel or reinforced concrete supports

4.22

Lines on treated wood supports

4.22

Meters

12.77

Self-propelled vehicles

12.77

Air conditioning plants

Static

4.22

Portable

7.60

Furniture & Furnishing

Office furniture and furnishings

6.33

Office equipment

6.33

Internal wirings including fittings and apparatus

6.33

Street Light fittings

6.33

Apparatus let on hire

Other than motors

7.60

Motors

4.22

Communication equipment

Radio and higher frequency carrier systems

6.33

41

Jharkhand Gazette (Extraordinary) Wednesday 15th October, 2025

Asset Description

Straight Line Depreciation (%)

Telephone lines and telephones

6.33

IT Equipment and Software

15.00

Any other assets not covered above

4.22(or as approved by the

Commission considering asset

life and residual value)

42

Jharkhand Gazette (Extraordinary) Wednesday 15th October, 2025

Appendix-II: Procedure for Calculation of Transmission

System Availability Factor for a Month

1. Transmission System Availability factor for nth calendar month (TAFM) shall be calculated by the respective

Transmission Licensee, got verified and certified by the SLDC and separately for each AC and HVDC

transmission system and grouped according to sharing of transmission charges. For the purpose of

calculation of TAFM:

(i)

AC transmission lines: Each circuit of AC transmission line shall be considered as one element:

(ii)

Inter-Connecting Transformers (ICTs)/Transformer: Each ICT bank/Transformer (three single

phase transformers together) shall form one element

(iii)

Static VAR Compensator (SVC): SVC along with SVC transformer shall form one element.

(iv)

Bus Reactors/Switchable line reactors: Each Bus Reactors/Switchable line reactors shall be

considered as one element.

(v)

HVDC Bi-pole links: Each pole of HVDC link along with associated equipment at both ends shall be

considered as one element.

(vi)

HVDC back-to-back station: Each block of HVDC back-to-back station shall be considered as one

element. If associated AC line (necessary for transfer of interregional power through HVDC back-

to-back station) is not available, the HVDC back-to-back station block shall also be considered as

unavailable.

(vii)

Static Synchronous Compensation (“STATCOM”): Each STATCOM shall be considered as separate

element

2. The Availability of AC and HVDC portion of Transmission system shall be calculated as under:

% TAFM for AC System

[{(o xAVo)+(p xAVp)+ (q xAVq)+ (r xAVr)+ (u x AVu)} / (o + p + q + r + u)] x 100

Where

o

=

Total number of AC lines.

AVo =

Availability of o number of AC lines.

p

=

Total number of bus reactors/switchable line reactors

AVp =

Availability of p number of bus reactors/switchable line reactors

q

=

Total number of ICTs/Transformer.

AVq =

Availability of q number of ICTs/Transformer.

r

=

Total number of SVCs.

AVr =

Availability of r number of SVCs.

43

Jharkhand Gazette (Extraordinary) Wednesday 15th October, 2025

u =

Total Number of STATCOM

AVu=

Availability of u number of STATCOMs

%TAFM for HVDC System:

Where

Cxbp(act)

=

Total actual operated capacity of xthHVDC pole

Cxbp

=

Total rated capacity of xth HVDC pole

AVxbp

=

Availability of Xth HVDC pole

Cybtb(act) =

Total actual operated capacity of ythHVDC back-to-back station block

Cybtb

=

Total rated capacity of yth HVDC back-to-back station block

AVybtb

=

Availability of yth HVDC back-to-back station block

s

=

Total no of HVDC poles

t

=

Total no of HVDC Back to Back blocks

3. The availability for each category of transmission elements shall be calculated based on the weighted factor,

total hours under consideration and non-available hours for each element of that category. The calculation

of Availability of each category of the transmission elements are as per Appendix III. The weightage factor

for each category of transmission elements shall be as under:

a. For each circuit of AC line – Number of sub-conductors in the line multiplied by ckt-km;

b. For each HVDC pole – The rated MW capacity x ckt-km

c. For each ICT bank/Transformer – The rated MVA capacity

d. For SVC- The rated MVAR capacity (inductive and capacitive)

e. For Bus Reactor/switchable line reactors – The rated MVAR capacity.

f. For HVDC back-to-back station connecting two Regional grids- Rated MW capacity of each block.

4. The transmission elements under outage due to following reasons shall be deemed to be available:

44

Jharkhand Gazette (Extraordinary) Wednesday 15th October, 2025

(a) Shut down availed for maintenance or construction of elements of another transmission

scheme. If the other transmission scheme belongs to the Transmission Licensee, the SLDC may

restrict the deemed availability period to that considered reasonable by him for the work

involved.

(b) Switching off of a transmission line to restrict over voltage and manual tripping of switched

reactors as per the directions of SLDC.

5. Outage time of transmission elements for the following contingencies shall be excluded from the total time

of the element under period of consideration.

(a) Outage of elements due to Force Majeure events such as war, strike, riot, floods, earthquake,

etc., beyond the control of the Transmission Licensee. However, onus of satisfying the SLDC that

element outage was due to aforesaid events and not due to design failure shall rest with the

Transmission Licensee. A reasonable restoration time for the element shall be considered by

SLDC and any additional time taken by the Transmission Licensee for restoration of the element

beyond the reasonable time shall be treated as outage time attributable to the Transmission

Licensee. SLDC may consult the Transmission Licensee or any expert for estimation of

reasonable restoration time. Circuits restored through ERS (Emergency Restoration System)

shall be considered as available.

(b) Outage caused by grid incident/disturbance not attributable to the Transmission Licensee, e.g.

faults in substation or bays owned by other agency causing outage of the Transmission

Licensee’s elements, and tripping of lines, ICTs, etc. due to grid disturbance. However, if the

element is not restored on receipt of direction from SLDC while normalizing the system

following grid incident/disturbance within reasonable time, the element will be considered not

available for the period of outage after issuance of SLDC’s direction for restoration.

6. Time frame for certification of transmission system availability: Following schedule shall be followed for

certification of availability by SLDC:

Submission of outage data by Transmission Licensees to SLDC- By 5th of the following month;

Review of the outage data by SLDC – By 20th of the month;

Issue of availability certificate by SLDC- By 3rd of the next Month.

45

Jharkhand Gazette (Extraordinary) Wednesday 15th October, 2025

Appendix III: Formulae for calculation of availability of each category of transmission elements

Where,

o

=

Total number of AC lines;

AVo

=

Availability of o number of AC lines;

p

= Total number of bus reactors/switchable line reactors;

AVp

= Availability of p number of bus reactors/switchable line reactors;

q

=

Total number of ICTs/Transformer;

AVq

=

Availability of q number of ICTs/Transformer;

r

=

Total number of SVCs;

AVr

=

Availability of r number of SVCs;

U

=

Total number of STATCOM;

AVu

=

Availability of u number of STATCOMs;

Wi

=

Weightage factor for ith transmission line;

Wk

=

Weightage factor for kth ICT/Transformer;

Wl

= Weightage factors for inductive & capacitive operation of lth SVC;

/

Transformer

46

Jharkhand Gazette (Extraordinary) Wednesday 15th October, 2025

Wm

=

Weightage factor for mth bus reactor;

Wn

=

Weightage factor for nth STATCOM.

Ti,, Tk, Tl,

Tm, Tn, Tx, Ty

The total hours of ithAC line, kthICT/Transformer, lthSVC, mthSwitched Bus ReactorTm, Tn, Tx,

Ty& nth STATCOM, xth HVDC pole, yth HVDC back-to-back blocks duringthe period under

consideration (excluding time period for outages notattributable to Transmission Licensee

for reasons given in Para 5of theprocedure)

TNAi, TNAk,

TNAl, TNAm,

TNAn, TNAx, TNAy

The non-availability hours (excluding the time period for outages notattributable to

Transmission Licensee taken as deemed availability asper Para 5 of the procedure) for ith AC

line, kth ICT/Transformer, lth SVC, mth SwitchedBus Reactor, nth STATCOM, xth HVDC pole and

ythHVDC back-to-backblock.

By Order of the Commission,

R.P.Nayak,

Secretary

Jharkhand State Electricity Regulatory Commission

-----------

Printed & Published by the Superintendent of Jharkhand Government Press, Doranda, Ranchi.

Jharkhand Gazette (Extraordinary) 473-- 50.