NOTIFICATION
16th October, 2025
(Terms and Conditions for Determination of Distribution Tariff) Regulations, 2025
Notification No. 115--In exercise of powers conferred by sub-section (1) of Section 181 and
clauses (zd), (ze) and (zf) of sub-section (2) of Section 181, read with Sections 61, 62, and 86, of
the Electricity Act, 2003 (36 of 2003) and all other powers enabling it in that behalf, the
Jharkhand State Electricity Regulatory Commission here by makes the following Regulations.
The Regulation is guided by the principles contained in Sections 61 and 62 of the Act to
encourage competition, efficiency, economical use of resources, good performance and
optimum investments by the Distribution Licensees within the State of Jharkhand and for
determination of Multi-Year Tariff to be recovered by the Distribution Licensees for the
prudent expenses incurred towards providing quality supply of power to consumers within the
State of Jharkhand.
No. 474
2
Jharkhand Gazette (Extraordinary) Thursday 16th October, 2025
CHAPTERI:
SCOPE, EXTENT AND DEFINITIONS
A1.
Short Title and Commencement
1.1
These Regulations shall be called the Jharkhand State Electricity Regulatory
Commission (Terms and Conditions for Determination of Distribution Tariff)
Regulations, 2025.
1.2
These Regulations shall extend to the whole of the State of Jharkhand.
1.3
These Regulations shall come into force for the period from April 01, 2026 to March
31, 2031, after its publication in the Official Gazette of the Government of Jharkhand
and unless reviewed earlier or extended by the Commission, shall remain in force upto
March 31, 2031.
1.4
These Regulations shall supersede the Jharkhand State Electricity Regulatory
Commission (Terms and Conditions for Determination of Distribution Tariff) (First
Amendment) Regulations, 2023, the Jharkhand State Electricity Regulatory
Commission (Terms and Conditions for Determination of Distribution Tariff)
Regulations, 2020, the Jharkhand State Electricity Regulatory Commission (Terms and
Conditions for Determination of Distribution Tariff) Regulations, 2015, Jharkhand State
Electricity Regulatory Commission (Terms and Conditions for Determination of
Distribution Tariff) Regulations, 2010, Jharkhand State Electricity Regulatory
Commission (Terms and Conditions of Tariff determination, Multi-Year Tariff
Framework) Regulations, 2007, and Jharkhand State Electricity Regulatory Commission
(Terms and Conditions for Distribution Tariff) Regulations, 2004, read with all
amendments thereto, as the case may be:
Explanation: For all purposes, including review matters pertaining to the period till March 31,
2026, the issues relating to determination of Aggregate Revenue Requirement and Tariff shall be
governed by the provisions of the Jharkhand State Electricity Regulatory Commission (Terms and
Conditions for Determination of Distribution Tariff) (First Amendment) Regulations, 2023 or the
Jharkhand State Electricity Regulatory Commission (Terms and Conditions for Determination of
Distribution Tariff) Regulations, 2020 or the Jharkhand State Electricity Regulatory Commission
(Terms and Conditions for Determination of Distribution Tariff) Regulations, 2015 or Jharkhand
State Electricity Regulatory Commission (Terms and Conditions for Determination of Distribution
Tariff) Regulations, 2010 or Jharkhand State Electricity Regulatory Commission (Terms and
Conditions of Tariff determination, Multi-Year Tariff Framework) Regulations, 2007 or Jharkhand
State Electricity Regulatory Commission (Terms and Conditions for Distribution Tariff)
Regulations, 2004, read with all amendments thereto, as may be applicable.
A2.
Scope of Regulations and Extent of Application
2.1
These Regulations shall be applicable for determination of ARR and Tariff to be billed
by the Distribution Licensees for Wheeling and Retail Supply Businesses to the different
categories of consumers including other Distribution Licensees within the State of
Jharkhand.
3
Jharkhand Gazette (Extraordinary) Thursday 16th October, 2025
2.2
In accordance with the principles laid out in these Regulations, the Commission shall
determine tariff for:
a)
Wheeling of electricity, i.e., wheeling tariff for the Control Period, and;
b)
RetailSupplyofelectricity,i.e.,retailsupplytarifffortheControlPeriod;
Provided that in case of distribution of electricity in the same area by two or more
Licensees, the Commission may, for promoting competition among Licensees, fix only a maximum
ceiling of tariff for retail supply of electricity;
Provided further that where any category of consumer has been permitted open access
under Section 42 of the Act, the Commission shall determine the wheeling tariff, cross-subsidy
surcharge, additional surcharge and other open access related charges in accordance with these
Regulations
and
Jharkhand
State
Electricity
Regulatory
Commission(Intra
State
Open
Access)Regulations, 2016, as amended from time to time.
2.3
The ARR determined for the Wheeling Business shall be used to fix the wheeling tariff
for the wheeling of electricity.
2.4
The ARR determined for the Retail Supply Business shall be used to fix the retail supply
tariff for the retail sale of electricity.
2.5
These Regulations shall extend to the entire State of Jharkhand and to all matters
within the jurisdiction of the Commission.
A3. Definitions and Interpretation
3.1
In these Regulations, unless the context other wise requires-
1.
‘Accounting Statement’ means for each Financial Year:
i. The Balance Sheet, prepared in accordance with the form contained in the
Companies Act, 2013 and its predecessors, as applicable;
ii. CashFlowStatement,preparedinaccordancewiththeapplicableAccounting
Standards of the Institute of Chartered Accountants of India;
iii. Cost Accounting Records prescribed by the Central Government under
Section 148 of the Companies Act, 2013 and its predecessors, as
applicable;
iv. Notes on accounts thereto, and such other supporting statements and
information forming part of financial statements or as the Commission
may direct from time to time;
v. Profit and Loss Account, complying with the requirements contained in
The Companies Act, 2013 and its predecessors, as applicable;
vi. Report of the Statutory Auditors, including any annexure and appendix
thereto, as applicable;
vii. Any or all the formats as notified by the Commission under these
Regulations for Tariff Regulation, including Multi Year Tariff Regulations
pertinent to the relevant year;
4
Jharkhand Gazette (Extraordinary) Thursday 16th October, 2025
viii. Reconciliation Statement, duly certified by the Statutory Auditors, showing
the reconciliation between the total expenses, revenue, assets and
liabilities, of the entity as a Company and the expenses, revenue, assets
and liabilities, separately for each Business regulated by the Commission
and unregulated business operations.
2.
‘Act’ means the Electricity Act, 2003 (36 of 2003) and subsequent
amendments thereof;
3.
‘Additional Capitalisation’ means the capital expenditure incurred and
capitalised or projected to be capitalised, after the date of commercial
operation of the scheme and admitted by the Commission after a prudence
check, subject to provisions of Clause 10.13of these Regulations;
4.
‘Aggregate Revenue Requirement’(ARR) means application for each financial
year, the costs pertaining to the Licensed business which are admissible, in
accordance with these Regulations, to be recovered in the form of tariffs and
charges determined by the Commission;
5.
‘Allocation Statement’ means for each financial year, a statement in respect
of each of the businesses (Wheeling, Retail Supply, Other Business) of the
Licensee, showing the amounts of any revenue, cost, asset, liability, reserve or
provision, etc., which has been either:
Determined by apportionment or allocation between different businesses of
the Licensee, including the Licensed Business, together with a description on
the basis of the apportionment or allocation;
or
Charged from or to each such Other Business together with a description on
the basis of that charge;
6.
‘Auditor’ means an auditor appointed by the Distribution Licensee, in
accordance with the provisions of sections 224, 233B and 619 of the
Companies Act, 1956 (1 of 1956), as amended from time to time or Chapter X
of the Companies Act, 2013 (18 of 2013) or any other law for the time being in
force;
7.
‘Bank Rate’ means the one-year Marginal Cost of Lending Rate (MCLR) of the
State Bank of India applicable as on April 01of the respective year or any
replacement thereof for the time being in effect;
8.
‘Base Year’ means the Financial Year 2025-26 and is used for the purposes of
these Regulations;
9.
‘Carrying Cost’ means the interest amount on gap/surplus;
10.
‘Collection Efficiency’ shall mean the ratio of total revenue realised to total
revenue billed for the same financial year;
11.
‘Commission’ means the Jharkhand State Electricity Regulatory Commission
5
Jharkhand Gazette (Extraordinary) Thursday 16th October, 2025
(JSERC);
12.
‘Conduct of Business Regulations’ means the Jharkhand State Electricity
Regulatory Commission(Conduct of Business) Regulations,2024, as amended
from time to time;
13.
‘Control Period’ means a multi-year period fixed by the Commission, from
April 01, 2026 and up to March 31, 2031;
14.
‘Deemed Distribution Licensee’ means a person/entity deemed to be a
Distribution Licensee under Section 14 of the Act;
15.
‘Distribution Licensee’ means a Licensee authorised to operate and maintain a
distribution system for supplying electricity to consumers in its area of supply
under Section 14 of the Act;
16.
‘Financial Year’ means a period commencing on April 01 of a calendar year
and ending on March 31 of the subsequent calendar year;
17.
‘Force Majeure Event’ means, with respect to any party, any event or
circumstance, or combination of events or circumstances, which is not within
the reasonable control of, and is not due to an act of omission or Commission
ofthatpartyandwhich,bytheexerciseofreasonablecareanddiligence,couldnotha
vebeenprevented;and,withoutlimitingthegeneralityofthe
foregoing,
shall
include the following events or circumstances:
(i)
acts of God, including but not limited to lightning, storm, action of
the elements, earthquakes, flood, torrential rains, drought and
natural disaster or any act of God beyond the control of any party
or due to any restraint of the State Government or Central
Government or any other Statutory Authority;
(ii)
strikes and industrial disturbances having a State-wide or extensive
impact in the area of supply of a Licensee, but excluding strikes and
industrial disturbances in the Distribution Licensee's own
organization;
(iii)
acts of war, invasion, armed conflict or act of foreign enemy,
insurrections, riots, revolution, terrorist or military action;
(iv)
unavoidable accident, including but not limited to fire, explosion,
radioactive contamination and toxic chemical contamination;
(v)
any shutdown or interruption of the grid, which is required or
directed by the concerned Load Dispatch Centre;
18.
‘Income from Other Business’ is the income received by the Distribution
Licensee other than from Tariff towards usage of assets and/or manpower
relating to regulated Business and shall exclude Non-Tariff Income;
19.
‘License’meansaDistributionLicensegrantedunderSection14oftheAct;
20.
‘Licensed Business’ shall mean the functions and activities, which the Licensee
6
Jharkhand Gazette (Extraordinary) Thursday 16th October, 2025
is required to undertake in terms of the License granted or being a deemed
Licensee under the Act;
21.
‘Non-Tariff Income’ means the net income relating to the regulated Business
other
than
from
Tariff
as
defined
in
Clause
no
10.53,excludinganyincomefromOtherBusiness;
22.
‘Open Access Consumer’ means any Licensee or Consumer or buyer or a
person engaged in generation who has been granted Open Access in
accordance with the Jharkhand State Electricity Regulatory Commission(Terms
and Conditions for Intra-State Open Access) Regulations, 2016 as amended
from time to time;
23.
‘Other Business’ means any other business of the Distribution Licensee for
optimum utilisation of its assets within the meaning of Section 51 of the Act;
24.
‘Prudence Check’ means scrutiny of reasonableness of any cost or expenditure
incurred or proposed to be incurred in accordance with these Regulations by
the Distribution Licensee;
25.
‘Retail Supply Business’ means the business of sale of electricity by a Licensee
to the category of consumers within the area of supply in accordance with the
terms of the Licensee for distribution and retail supply of electricity;
26.
‘Retail Supply Tariff’ is the rate charged by the Licensee for supply to non-
open access consumers, which includes charges for Wheeling and Retail
Supply;
27.
‘Trading Business’ means the business of purchase of electricity by the
Licensee for resale to another Licensee or consumers or category of
consumers outside the area of supply of the Licensee;
28.
‘Tariff Period’ shall mean the period from April 01,2026andupto
March31,2031,forwhichTariffisdeterminedbytheCommissionunderthese
Regulations;
29.
‘Wheeling’ means the operation whereby the distribution system and
associated facilities of a Licensee are used by another person for the
conveyance of electricity on payment of charges to be determined under
Section 62 of the Act;
30.
‘Wheeling Business’ means the business of operating and maintaining a
distribution system for conveyance of electricity in the area of supply of the
Licensee;
31.
‘Average Cost of Supply’ (ACoS) shall mean average cost price of supply of
one unit of electricity;
32.
‘Fuel and Power Purchase Adjustment Surcharge’(FPPAS) shall mean the
increase in cost of power supplied to consumers due to a change in Fuel cost,
power purchase cost and transmission charges with reference to the cost of
supply approved by the Commission.
7
Jharkhand Gazette (Extraordinary) Thursday 16th October, 2025
3.2
Words and expressions used in these Regulations and not defined herein but defined
in the Act shall have the meanings respectively assigned to them in the Act.
3.3
Reference to any Act, Rules and Regulations shall include amendment or consolidation
or re-enactment thereof.
3.4
All proceedings under these Regulations shall be governed by the Jharkhand State
Electricity Regulatory Commission (Conduct of Business) Regulations, 2024 as
amended or re-enacted from time to time.
A4.
Tariff Approved to be Ceiling Tariff
4.1
For removal of doubts, it is clarified that the Tariffs determined under the
provisions of these Regulations are the ceiling values and this shall not preclude
the Distribution Licensee from proposing reduced Tariffs for any consumer.
However, in such case the reduced Tariffs shall not be considered for the
determination of Revenue as the same is the liability of the Distribution Licensee.
8
Jharkhand Gazette (Extraordinary) Thursday 16th October, 2025
CHAPTERII:
TARIFFFRAMEWORKANDGUIDINGPRINCIPLES
A5.
Multi–Year Tariff (MYT)Framework
5.1
The MYT Framework shall commence from April 01, 2026, and unless reviewed earlier
or extended by the Commission, shall be applicable till March 31, 2031. The ARR filings
for the Control Period shall be done in accordance with the MYT framework contained
in these Regulations.
5.2
The Distribution Licensees shall file the MYT Application along with supporting
documents before the Commission as per the timelines specified in Section A 24 of
these Regulations.
5.3
The MYT Application shall include statements containing ARR along with its break up
for the Years of the previous Control Period based on Audited Accounts for FY 2020-21
to FY 2024-25, revised estimates for Base Year FY 2025-26, and the projections for
each year of the Control Period.
5.4
The Guiding Principles for the MYT Framework are described in Section A6of these
Regulations.
5.5
The principles for the determination of ARR for the Control Period are described in
Chapter III of these Regulations, and the procedure for Annual Filing during the
Control Period is described in Chapter IV of these Regulations.
A6. Guiding Principles for Multi-Year Tariff (MYT)Framework
6.1
The Commission shall adopt a Multi-Year Tariff Framework for approval of ARR and
expected revenue from Wheeling and Retail Supply Tariff Business. The ARR shall be
determined for each year of the Control Period.
6.2
The Multi-Year Tariff framework shall be based on the following:
a)
Business Plan for the Wheeling and the Retail Supply Business of the Licensees
for the entire Control Period to be filed before the Commission for approval,
along with MYT Petition prior to the start of the Control Period or within such
period as the Commission may direct;
b)
Licensees’ forecast of expected ARR for each year of the Control Period,
wheeling tariff and retail supply tariff for the first year of the ensuing Control
Period,basedonreasonableassumptionsoftheunderlyingfinancialandoperationa
l principles/parameters laid down under these Regulations, and on the basis of
the Business Plan;
c)
Trajectory for specific parameters shall be prescribed by the Commission for
improvement of Licensee’s performance through incentives and disincentives;
d)
Annual review of performance, which shall be conducted vis-à-vis the
approved forecast and categorization of variations in performance into
controllable and uncontrollable factors; and
e)
Mechanism for sharing approved gains or losses on account of controllable
9
Jharkhand Gazette (Extraordinary) Thursday 16th October, 2025
and uncontrollable factors.
Determination of Baseline
6.3
The values for the Base Year of the Control Period shall be determined on the basis of
the audited accounts available for FY 2020-21 to FY 2024-25. In the absence of audited
accounts of any such year, the Commission may consider best estimate for such year
after carrying out due prudence check and after taking into account other factors as
considered relevant by the Commission.
6.4
The Commission shall normally not revise the performance targets during the Control
Period, unless the Commission is of the view that there is a major variation in
approved numbers vis-à-vis actuals.
Segregation of Retail Supply and Wheeling Business
6.5
The Licensee shall segregate the accounts of the Licensed Business into Wheeling
Business and Retail Supply Business.
6.6
The ARR for Wheeling Business shall be used to determine Wheeling Tariff and the
ARR for Retail Supply Business shall be used to determine Retail Supply Tariff.
6.7
For such period until accounts are segregated, the Licensee shall prepare an Allocation
Statement to apportion costs and revenues to respective business. The Allocation
Statement, approved by the Board of Directors of the Licensee, shall be accompanied
with an explanation of the basis and methodology used for segregation, which should
be consistent over the Control Period.
6.8
In case clear and reasoned methodology for allocation is not submitted by the
Distribution Licensee, the Commission may consider the segregation as approved for
the previous Control Period as specified below or may decide on the manner in which
such allocation can be done:
Particulars
Shareof Supply
Business
Shareof Wires
Business
O&M Cost
Employee cost
40%
60%
A&G Expense
50%
50%
R&M Cost
10%
90%
Power purchase(Including PGCIL & RLDC Charges)
100%
0%
Interest on security deposit
100%
0%
Interest Cost
10%
90%
Interest on working capital
90%
10%
Taxes on Income
10%
90%
Depreciation
10%
90%
Return on Equity
10%
90%
10
Jharkhand Gazette (Extraordinary) Thursday 16th October, 2025
Particulars
Shareof Supply
Business
Shareof Wires
Business
Less:Non-Tariff/Other Income
90%
10%
Business Plan
6.9
Each Licensee shall file for the Commission’s approval a Business Plan approved by an
authorized signatory, as per the timelines specified in Section A 24of these
Regulations.
6.10
The Business Plan shall be filed separately for the Retail Supply and Wheeling
Business. As specified in Clause 6.7of these Regulations, in the absence of segregated
accounts for the two Businesses, the Licensee shall prepare an allocation statement
and submit the same with the Business Plan.
6.11
TheBusinessPlanshallbefortheentireControlPeriodandshallinter-aliacontain:
a)
Capital Investment Plan for the entire Control Period commensurate with
load growth, distribution loss reduction trajectory and quality improvement
measures proposed in the Business Plan. The Capital Investment Plan should
also include corresponding capitalisation schedule and financing plan;
The Distribution Licensee shall also submit scheme-wise capital structure and
cost of financing(interest on debt) and return on equity, Grant, Deposit Works,
along with terms of the existing loan agreements, etc., as a part of the Capital
Investment Plan;
b)
Sales/Demand Forecast for each consumer category and sub-categories for
each year of the Control Period;
c)
Power Procurement Plan based on the sales forecast and distribution loss
trajectoryforeachyearoftheControlPeriod.ThePowerProcurementPlanshall also
include energy efficiency, RPO fulfilment, and demand side management
measures;
d)
A set of targets proposed for other controllable items such as distribution
losses, Billing efficiency, Collection efficiency, working capital requirement,
quality of supply targets (viz., SAIFI, SAIDI and MAIFI as per the Jharkhand
State Electricity Regulatory Commission( Distribution Licensees’ Standards of
Performance) Regulations, 2015, and subsequent amendments), etc. The
targets shall be consistent with the capital investment plan proposed by the
Licensee.
e)
Human Resource Plan with manpower planning including details of the
estimated year wise manpower addition and retirements for the Control
Period to meet the growth in demand/consumers;
f)
Proposals for Non-Tariff Income with item-wise description and details;
11
Jharkhand Gazette (Extraordinary) Thursday 16th October, 2025
g)
Proposals in respect of income from Other Business.
Business Plan shall also contain the requisite information for the preceding
Control Period:
Provided that requisite information for the preceding Control Period shall
include year-wise audited data on Scheme-wise capital investment,
distribution loss trajectory, quality improvement measures undertaken,
category-wise number of consumers, connected load and sales, source-wise
power procurement quantum and cost, Employee, R&M and A&G Expenses
along with detailed break up and any other information used for preparing
projections of various performance parameters and other components during
the Control Period. In case of a new Licensee, such information is required to
be submitted for the period of operations up to the start of the Control
Period.
Capital Investment Plan
6.12
The Licensee shall file for the Commission’s approval a Capital Investment Plan for the
entire Control Period along with the Business Plan. The Capital Investment Plan shall
be prepared scheme-wise, and each scheme shall include:
a)
Purpose of investment (e.g., replacement of existing assets, meeting load
growth, technical and distribution loss reduction, non-technical loss reduction,
meeting reactive energy requirements, customer service improvement,
improvement in quality and reliability of supply, etc.);
b)
Approval of Competent Authority;
c)
Capital Structure;
d)
Detailed Project Report;
e)
Capitalisation Schedule;
f)
Implementation schedule including timelines;
g)
Cost-benefit analysis and Rate reasonability;
h)
Improvement in operational efficiency envisaged in the Control Period;
i)
Ongoing schemes that will spill over in to the year under review, along with
justification;
j)
New schemes that will commence during the Control Period but may be
completed within or beyond the Control Period.
6.13
During the Annual Performance Review (APR), the Commission shall monitor the year-
wise progress of the actual capital expenditure incurred by the Licensee vis-à-vis the
approvedcapitalexpenditure.TheLicenseeshallsubmittheactualcapitalexpenditure
incurred along with the Annual Performance Review Filing.
6.14
The Commission shall review the actual capitalisation at the end of each year of the
Control Period vis-à-vis the approved capitalisation schedule and shall true up the ARR
12
Jharkhand Gazette (Extraordinary) Thursday 16th October, 2025
based on actual capitalisation for the year for which True up has been filed and also
revise the ARR components for the year for which APR and Tariff have been sought.
6.15
In case the capital expenditure is required for emergency work, which has not been
approved in the Capital Investment Plan, the Licensee shall submit an application
containing all relevant information along with reasons justifying the emergency nature
of the proposed work, seeking approval of the Commission wherever possible:
Provided that in case the capital expenditure is required for emergency work or
unforeseen situation to mitigate threat to life and property and if prior intimation
there o f to the Commission shall cause any irreparable loss or injury, the Licensee
may undertake such capital expenditure and submit the details for post-facto approval
of the Commission along with next Tariff Petition with all relevant details.
Sales/Demand Forecast
6.16
The Licensee, in its Business Plan filings, shall forecast sales for each consumer
category, sub-category and for each tariff slab, at different voltage levels, for each
year of the Control Period based on recent trends and historical growth for the
Commission’s review and approval along with the requisite details of category-wise
and voltage-wise sales, contracted load, number of consumers, etc.
6.17
The Commission shall examine the forecasts for reasonableness and consistency on
the basis of expected growth in the number of consumers, changes in pattern of
consumption, seasonal variations, target distribution losses, demand for electricity in
previous years and anticipated growth in the next year, and any other factor
considered relevant by the Commission, and accordingly approve sales forecast with
such modifications as deemed fit for each year of the Control Period.
6.18
Sales of electricity, if any, to electricity traders or another Licensee shall be separately
indicated.
6.19
The Licensee shall also indicate category-wise open access consumers along with open
access sales. The energy wheeled for them shall be shown separately for:
a)
Supply with in its area of supply; and
b)
Supply outside its area of supply.
Power Procurement Guidelines
6.20
The Distribution Licensee shall undertake its Power procurement during the year in
accordance with the Power Procurement Plan for the Control Period, which may
include long-term, medium-term and short-term power procurement, approved by
the Commission in accordance with these Regulations.
6.21
The Distribution Licensee shall follow the Guidelines contained in this Part with
respect to:
a)
Procurement of power under any arrangement or agreement with a term or
duration exceeding twelve (12) years and up to twenty-five (25) years (i.e.,
long-term power procurement);
13
Jharkhand Gazette (Extraordinary) Thursday 16th October, 2025
b)
Procurement of power under any arrangement or agreement with a term or
duration exceeding 3 months but not exceeding three (3) years (i.e., medium-
term power procurement); and
c)
Procurement of power under any arrangement or agreement with a term or
duration less than or equal to one (1) month (i.e., short-term power
procurement).
Power Procurement Plan
6.22
The Distribution Licensee shall prepare a plan for procurement of power to serve the
demand for electricity in its area of supply and submit such plan to the Commission for
approval:
Provided that such power procurement plan shall be submitted for the
Control Period from FY 2026-27 to FY 2030-31:
Provided further that the power procurement plan proposed as a part of the Business
Plan, shall be submitted along with the application for determination of tariff:
ProvidedalsothatthepowerprocurementplansubmittedbytheDistribution Licensee may
include purchase from long-term, medium- term and short-term sources of power, in
accordance with these Regulations. However, the Distribution Licensee should, as far
as possible, not plan for short-term purchases except for conditions specified in Clause
6.31 to Clause 6.36 and should endeavor to meet its requirement from long-term and
medium-term power procurement and make a plan accordingly.
6.23
The power procurement plan of the Distribution Licensee shall comprise the
following:
a)
A quantitative forecast of the unrestricted demand for electricity for each
tariff category, within its area of supply over the Control Period;
b)
An estimate of the quantities of electricity supply from the identified sources
of generation and power purchase;
c)
An estimate of availability of power to meet the Base Load and Peak Load
requirement:
Provided that such estimate shall be monthly estimation of demand and
supply expressed both in Mega-Watt (MW) as well as in Million Units (MU);
d)
Standards to be maintained with regard to quality and reliability of supply, in
accordance with the Jharkhand State Electricity Regulatory Commission
(Distribution Licensees’ Standards of Performance) Regulations, 2015, as
amended from time to time;
e)
Measures proposed to be implemented as regards energy conservation and
energy efficiency;
f)
The requirement for new sources of power generation and/or procurement,
including augmentation of generation capacity and identified new sources of
supply, based on (a) to (e) above;
14
Jharkhand Gazette (Extraordinary) Thursday 16th October, 2025
g)
The plan for procurement of power including quantities and cost estimates for
such procurement:
Provided that the forecast/estimate contained in the long-term procurement
plan shall be separately stated for peak and off-peak periods, in terms of
quantities of power to be procured (in MU) and maximum demand (in MW /
MVA):
Provided further that the forecasts/ estimates shall be prepared for each
month of the Control Period:
Provided also that the long-term procurement plan shall be a cost-effective
plan based on available information regarding costs of various sources of
supply.
6.24
The forecasts estimates shall be prepared using forecasting techniques based on past
data and reasonable assumptions regarding the future:
Provided that the forecasts/estimates shall take into account factors such as overall
economic growth, consumption growth of electricity-intensive sectors, advent of
competition in the electricity industry, trends in captive power, impact of loss
reduction initiatives, improvement in Generating Station Plant Load Factors and other
relevant factors.
The concerned licensee will endevour to implementan application-based
automated tool, incorporating advanced technologies such as Artificial Intelligence
and Machine Learning, for managing the power procurement portfolio and enabling
accurate demand–supply forecasting. A detailed feasibility report covering the
technical
framework,
operational
modalities,
cost–benefit
analysis,
and
implementation schedule shall be submitted to the Commission. The tool shall be
designed to optimise key performance indicators of power procurement, including,
but not limited to, reduction in total power purchase cost, reduction in Deviation
Settlement Mechanism charges, optimisation of bilateral and power exchange
transactions, and enhancement of forecasting accuracy.
6.25
Where the Commission has stipulated a percentage of the total consumption of
electricity in the area of a Distribution Licensee to be purchased from cogeneration/
renewable sources of energy, the power procurement plan of such Distribution
Licensee shall include the plan for procurement from such sources at least up to the
stipulated level.
6.26
The Distribution Licensee shall be required to forward a copy of the power
procurement plan to the State Transmission Utility for verification of its consistency
with the transmission system plan for the intra-State transmission system:
Provided that the Distribution Licensee may also consult the State
Transmission Utility at the time of preparation of the power procurement plan to
ensure consistency of such plan with the transmission system plan.
15
Jharkhand Gazette (Extraordinary) Thursday 16th October, 2025
6.27
The Distribution Licensee may, as a result of additional information not previously
known or available at the time of submission of the power procurement plan, apply
for a modification in the power procurement plan for the remainder of the Control
Period, as part of the application for Annual Performance Review.
6.28
The Commission may, as a result of additional information not previously known or
available to the Commission at the time of submission of the power procurement plan,
if it so deems, either on suo-motu basis or on an application made by any interested or
affected party, modify the power procurement plan of the Distribution Licensee for
the remainder of the Control Period, as part of the Annual Performance Review.
Approval of power purchase agreement/arrangement
6.29
Every agreement or arrangement for power procurement by a Distribution Licensee
from a Generating Company or Licensee or from other source of supply entered into
shall come into effect only with the prior approval of the Commission:
Provided that the prior approval of the Commission shall be required in respect of
any agreement or arrangement for power procurement by the Distribution Licensee
from a Generating Company or Licensee or from any other source of supply on a
standby basis:
Provided further that the prior approval of the Commission shall be required for any
change to an existing arrangement or agreement for power procurement, whether or
not such existing arrangement or agreement was approved by the Commission.
6.30
The Commission shall review an application for approval of power procurement
agreement/arrangement having regard to the approved power procurement plan of
the Distribution Licensee and the following factors:
a)
Requirement for power procurement under the approved power procurement
plan;
b)
Adherence to a transparent process of bidding in accordance with guidelines
issued by the Central Government;
c)
Adherence to the terms and conditions for determination of tariff specified
under these Regulations where the process specified in (b) above has not been
adopted;
d)
Availability (or expected availability) of capacity in the intra-State transmission
system for evacuation and supply of power procured under the agreement/
arrangement;
e)
Need to promote co-generation and generation of electricity from renewable
sources of energy.
Additional Short-term power procurement
6.31
The Distribution Licensee may undertake additional short-term power procurement
during the year, over and above the power procurement plan for the Control Period
approved by the Commission, in accordance with this Regulation.
16
Jharkhand Gazette (Extraordinary) Thursday 16th October, 2025
6.32
Where there has been a shortfall or failure in the supply of electricity from any
approved source of supply during the Financial Year, the Distribution Licensee may
enter into additional short-term arrangement or agreement for procurement of
power:
Provided that if the total power purchase cost or quantum for any block of six months
including such short-term power procurement exceeds the power purchase cost or
quantum approved by the Commission for the respective block of six months by more
than ten percent (10%), the Distribution Licensee shall have to obtain post-facto
approval of the Commission.
6.33
Where the Distribution Licensee has identified a new short-term source of supply from
which power can be procured at a tariff that reduces its approved total power
procurement cost, the Distribution Licensee may enter into a short-term power
procurement agreement or arrangement with such supplier without the prior approval
of the Commission.
6.34
The Distribution Licensee may enter into a short-term arrangement or agreement for
procurement of power or procure power from Power Exchanges without the prior
approval of the Commission when faced with emergency conditions that threaten the
stability of the distribution system or when directed to do so by the State Load
Dispatch Centre to prevent grid failure.
6.35
Within fifteen (15) days from the date of entering into an agreement or arrangement
for short-term power procurement for which prior approval is not required, the
Distribution Licensee shall provide the Commission, full details of such agreement or
arrangement, including quantum, tariff calculations, duration, supplier details, method
for supplier selection and such other details as the Commission may require with
regard to such agreement/arrangement to assess that the conditions specified in this
Regulation have been complied with:
Provided that where the Commission has reasonable grounds to believe that
the arrangement or agreement entered into by the Distribution Licensee does not
meet the criteria specified in Clause 6.32 to Clause 6.34, the Commission may disallow
any increase in the total cost of power procurement (net of additional revenue) over
the approved level arising there from or any loss incurred by the Distribution Licensee
as a result, from being passed through to consumers.
6.36
Subject to the cases specified in Clause 6.32 to Clause 6.34, where the Distribution
Licensee enters into any agreement or arrangement for short-term power
procurement without the approval of the Commission, any increase in the total cost of
power procurement (net of additional revenue) over the approved level arising there
from shall be deemed to be a variation in performance attributable entirely to
controllable factors.
6.37
In addition, the Licensee may also sell any surplus power in the open market provided
that such sale of power shall lead to recovery of tariff higher than the variable cost of
such power.
17
Jharkhand Gazette (Extraordinary) Thursday 16th October, 2025
Targets for Distribution Losses and Collection Efficiency
6.38
The Licensee shall file the distribution loss trajectory for the entire Control Period in
the Business Plan commensurate with the Capital Investment Plan for each year of the
Control Period for approval of the Commission.
6.39
The minimum collection efficiency targets to be met during the Tariff Period by various
Licensees are as follows:
Collection Efficiency Targets
Utility
2026-27
2027-28
2028-29
2029-30
2030-31
JBVNL
99.00%
99.00%
99.00%
99.00%
99.00%
TSUISL
99.50%
99.50%
99.50%
99.50%
99.50%
SAIL-Bokaro
99.50%
99.50%
99.50%
99.50%
99.50%
TSL
99.50%
99.50%
99.50%
99.50%
99.50%
DVC
99.50%
99.50%
99.50%
99.50%
99.50%
Providedthatincasetheactualcollectionefficiencyisgreaterthanthetarget,the actual
collection efficiency shall be considered for Tariff Determination purposes.
Quality of Supply and Services
6.40
The quality of supply and the customer service parameters shall be monitored as per
the norms specified by the Commission from time to time.
6.41
The Licensees shall propose the baseline and performance trajectory for all quality
parameters as specified in the Jharkhand State Electricity Regulatory Commission
(Distribution Licensees’ Standards of Performance) Regulations, 2015, as amended
from time to time as per the formats specified in the said Regulations. For the Control
Period, the proposed baseline and performance trajectory shall be submitted along
with the Business Plan.
6.42
The Commission shall make an assessment of reliability of baseline data and may
prescribe the performance trajectory for each identified parameter for the Control
Period.
In this regard a benchmarking study shall be undertaken for operational, technical,
financial, and standards of performance parameters, taking into account prevailing
market dynamics and best practices within the power sector. A detailed report of the
benchmarking exercise shall be submitted to the Commission within six months from
the date of notification of these Regulations and in turn the commission may by doing
proper assessment of the report of the benchmark study submitted by the respective
utilities, may further take the initiative for determining the best practices in power
sector independently by engaging any expert in this field.
6.43
The performance framework to encourage Licensees to improve quality of supply and
services shall be as per the Jharkhand State Electricity Regulatory Commission
(Distribution Licensees’ Standards of Performance) Regulations, 2015, as amended
18
Jharkhand Gazette (Extraordinary) Thursday 16th October, 2025
from time to time.
Controllable and Uncontrollable elements of ARR
6.44
For the purpose of the MYT Framework contained in these Regulations, the elements
of ARR shall be identified as “controllable” and “uncontrollable”, as follows:
ARRElement
Controllable/Uncontrollable
Variation in Sales
Uncontrollable
Power Purchase Cost (excluding short-term power)
Uncontrollable
Short-Term Power Purchase Cost
Controllable(CeilingValue)
Transmission & Load Dispatch Charges
Uncontrollable
O&M Expenses(excluding terminal liabilities of employees)
Controllable
Terminal liabilities of employees
Uncontrollable
Return on Equity
Controllable
Interest on Loan
Controllable
Interest on Working Capital
Controllable
Depreciation
Controllable
Taxes on Income
Uncontrollable
Foreign Exchange Rate Variation
Uncontrollable
Non-Tariff Income
Uncontrollable
Income from Other Businesses
Uncontrollable
Interest on Consumer Security Deposit
Uncontrollable
Distribution Loss and Collection Efficiency
Controllable
Quality of Supply
Controllable
Capital Expenditure
Controllable
Capitalisation
Controllable
Variation in Wires Availability and Supply Availability
Controllable
6.45
The variation on account of uncontrollable elements shall be treated as a pass-through
to be ultimately charged to the consumers, subject to a prudence check and approval
by the Commission.
6.46
The Commission shall also permit pass-through of variations in controllable items on
account of Force Majeure events and due to a Change in Law in the ARR for the
ensuing year, based on the submission of actual values by the Licensee and
subsequent validation and approval by the Commission.
6.47
The variation from targets specified by the Commission on account of controllable
elements shall be subject to an incentive and penalty framework, as detailed in the
subsequent section.
19
Jharkhand Gazette (Extraordinary) Thursday 16th October, 2025
Incentive and PenaltyFramework
6.48
Various elements of the Aggregate Revenue Requirement (ARR) of the Licensee shall
be subject to an incentive and penalty framework, as per the terms specified in this
section. The overall aim is to incentivise better performance and penalise
underperformance, based on performance norms/benchmarks specified by the
Commission.
6.49
The gains/losses shall be computed on aggregate basis for controllable items such as
Operation & Maintenance Expenses (excluding Terminal Liabilities), Distribution Losses
and Collection Efficiency considered collectively on annual basis. The computations
shall be based on the data submitted by the Licensee in the Annual Performance
Review and audited annual accounts and shall be subject to prudence check by the
Commission.
6.50
In case of aggregate gains, the aggregate gain shall be shared between the Licensee
and the consumers in the ratio of fifty:fifty (50:50) respectively.
6.51
The gains to be shared shall be passed on to the consumers through Tariff during the
Annual Performance Review for each year of the Control Period.
6.52
In case of any loss on account of underperformance with respect to the controllable
parameters, the Licensee shall bear the entire losses and no proportion of losses shall
be passed on to the consumers.
6.53
In addition, the net savings due to refinancing of Loans by the Distribution Licensee
shall be shared between the Users and the Licensee, as the case may be, in the ratio of
fifty:fifty (50:50).
A7. Truing-up
7.1
The Licensee shall submit along with the application for truing up, category-wise and
voltage-wise sales, contracted demand and number of consumers, source-wise power
purchase quantum and cost, details of capital expenditure, additional capitalization,
sources of financing, operation and maintenance expenditure, actual loan portfolio
with the interest paid along with other components of ARR, for each year of the
Control Period, on the basis of annual Audited Accounts as per the Timelines
stipulated in Section A 24.
7.2
Where after the truing up, the revenue recovered exceeds the trued up value
approved by the Commission under these Regulations, the surplus amount shall be
treated as specified in Clause 7.4 of these Regulations.
7.3
Where after the truing up, the revenue recovered is less than the trued up value
approved by the Commission under these Regulations, the gap amount shall be
treated as specified in Clause 7.4 of these Regulations.
7.4
The amount under-recovered or over-recovered, along with simple interest at the rate
equal to Bank Rate as on April01 of the respective year plus two hundred (200)basis
points, shall be carried forward to the Tariff approved for the subsequent years:
20
Jharkhand Gazette (Extraordinary) Thursday 16th October, 2025
Provided that no carrying cost on the duration of delay shall be allowed on unrecovered gap if the
Licensee fails to submit the Petitions as per the timelines stipulated in Section A 24:
Provided further that if such gap is large, and it is not feasible to recover the same in one
year alone, the Commission may take a view to create a regulatory asset, as per the guidelines
provided in Clause 8.2.2 of the Tariff Policy, 2016.
Provided further that any adverse financial impact on account of variation in uncontrollable
items due to lapse on part of the Licensee or its suppliers/contractors shall not be allowed in truing
up.
7.5
The Commission, to ensure tariff stability, may include the trued-up costs in the
subsequent Control Period’s ARR instead of including in the year succeeding the
relevant year of the Control Period.
A8. Annual Performance Review
8.1
The Licensee shall submit along with the application for Annual Performance Review,
details of category-wise and voltage-wise sales, contracted demand and number of
consumers, source-wise power purchase quantum and cost, details of capital
expenditure, additional capitalization, sources of financing, operation and
maintenance expenditure, actual loan portfolio with the interest paid along with other
components of ARR incurred/projected to be incurred for the year under review, as
per the timelines stipulated in Section A 24.
8.2
Along with Annual Performance Review Filing, the Licensee shall also claim revised
ARR for the following year based on the truing up and annual performance review of
previous year/s.
8.3
The Scope of the Annual Performance Review shall be comparison of the approved
expenses vis-à-vis revised estimates for the year(s)and shall comprise the following:
a)
Comparison of Approved Capital Expenditure and Capitalisation vis-à-vis
revised estimates by the Licensee based on the latest actual data available;
b)
Comparison of Sales and Power Purchase required to meet the requisite Sales
approved by the Commission vis-à-vis the revised estimates by the Licensee
based on the latest actual data available;
c)
Comparison of Other Expenses such as Interest on Loan, Interest on Working
Capital, Return on Equity, Depreciation and O&M Expenses approved by the
Commission vis-à-vis the revised estimates by the Licensee based on the latest
actual data available;
d)
Computation of the sharing of gains and losses on account of controllable
factors for the previous year;
e)
Approved Revenue vis-à-vis revised estimates based on the latest actual data
available.
f)
Any other Expenses/ Revenues impacting ARR.
8.4
Distribution Licensees may, as a result of additional information not previously known
21
Jharkhand Gazette (Extraordinary) Thursday 16th October, 2025
or available to them at the time the forecast was developed, apply for a modification
in the approved forecast of ARR and expected revenue from tariff and charges for the
remainder of the Control Period, as part of the Annual Performance Review.
8.5
The Commission if, as a result of additional information not previously known or
available to it at the time the forecast was developed, is of the view that the same
may result in significant over/under recovery, either suo-motu or on an application
made by any interested or affected party, modify the approved forecast of ARR and
expected revenue from tariff and charges for the remainder of the Control Period, as
part of the Annual Performance Review.
8.6
Based on the analysis of Annual Performance Review and Truing up, the Commission,
may revise the ARR and Tariff for the ensuing year of the Control Period.
22
Jharkhand Gazette (Extraordinary) Thursday 16th October, 2025
CHAPTER III: DETERMINATION OF ARR
A9.
Details for True-up, APR and determination of ARR & Tariff
9.1
The Distribution Licensee shall submit the details for True-up for the previous year,
Annual Performance Review for the current year and Tariff Determination for the
ensuing year as per the principles discussed in the subsequent Sections.
A10.PrinciplesforDeterminationofARR
Calculation of ARR for Wheeling Business during the Control Period
10.1
The Aggregate Revenue Requirement for the Wheeling Business of the Licensees for
each year of the Control Period, shall comprise the following items:
a)
Operation and Maintenance Expenses;
b)
Return on Equity;
c)
Interest on Working Capital;
d)
Interest on Loans;
e)
Depreciation;
f)
Income Tax;
g)
Lease Charges;
h)
Foreign Exchange Rate Variation;
i)
Less: Non-Tariff Income;
j)
Less: Income from Other Business; and
k)
Less: Income from wheeling of electricity(refer Clause 10.50)
Calculation of ARR for Retail Supply Business during the Control Period
10.2
The Aggregate Revenue Requirement for the Retail Supply Business of the Licensees
for each year of the Control Period, shall comprise the following items:
a)
Cost of power procurement;
b)
Transmission & Load Dispatch charges;
c)
Operation and Maintenance Expenses;
d)
Return on Equity;
e)
Interest on Working Capital;
f)
Interest on Loans;
g)
Interest on Consumer Security Deposit;
h)
Depreciation;
i)
Income Tax;
j)
Lease Charges;
23
Jharkhand Gazette (Extraordinary) Thursday 16th October, 2025
k)
Foreign Exchange Rate Variation;
l)
Bank Charges subject to the prudent check
m)
Less: Non-Tariff Income;
n)
Less: Income from Other Business; and
o)
Less: Receipts on account of Cross Subsidy Surcharge and Additional Surcharge
from Open Access Consumers.
OperationandMaintenanceExpenses
10.3
Operation and Maintenance(O&M)Expenses shall include:
a)
Salaries, wages, pension contribution and other employee costs;
b)
Administrative and General Expenses;
c)
Repairs and Maintenance Expenses.
10.4
The O&M Expenses for the Base Year of the Control Period shall be approved by the
Commission taking into account the audited accounts of FY 2020-21 to FY 2024-25,
Business Plan filed by the Licensee, estimates of the actual for the Base Year, prudence
check and any other factor considered appropriate by the Commission.
10.5
The O&M expenses permissible towards ARR of each year of the Control Period shall
be approved based on the formula shown below:
O&Mn=(R&Mn+EMPn+A&Gn)+Terminal Liabilities
Where,
R&Mn–Repair and Maintenance Costs of the Licensee for thenth year;
EMPn– Employee Costs of the Licensee for thenthyear, excluding term
inalliabilities;
A&Gn–Administrative and General Costs of the Licensee for thenth year.
10.6
The above components shall be computed in the manner specified below:
a)
R&Mn=K*GFA*(INDXn/INDX0)
Where,
‘K’ is a constant (expressed in percentage(%)) governing the relationship
between R&M costs and Gross Fixed Assets (GFA) and shall be calculated
based on the percentage (%) of R&M to GFA of the preceding year of the
Base Year in the MYT Order after normalising any abnormal expenses;
‘GFA’is the opening value of the gross fixed asset of thenthyear;
INDXn is the indexation for nth year of control period;
INDXo is the indexation for the base year of the control period;
b)
EMPn+A&Gn=[(EMPn-1)*(1+Gn)+(A&Gn-1)]*(INDXn/INDXn-1)+ provision for A&G (if
any)
24
Jharkhand Gazette (Extraordinary) Thursday 16th October, 2025
Where,
EMPn-1– Employee Costs of the Licensee for the (n-1)th year excluding
terminal liabilities;
A&Gn-1– Administrative and General Costs of the Licensee for the (n-1)th
year excluding legal/litigation expenses;
INDXn– Inflation factor to be used for indexing the employee cost and A&G
cost. This will be a combination of the Consumer Price Index (CPI) and the
Wholesale Price Index (WPI) for immediately preceding year before the
base year;
Gn – is a growth factor for the nth year and it can be greater than or lesser
than zero based on the actual performance. Value of Gn shall be
determined by the Commission in the MYT Order for meeting the
additional manpower requirement based on the Distribution Licensee’s
Filing, benchmarking and any other factor that the Commission feels
appropriate;
Provision: Cost or initiatives or other one-time expenses as proposed by the
Distribution Licensee subject to the prudence check and is validated by the
Commission.
c)
INDXn=0.55*CPIn+0.45*WPIn;
Note 1: For the purpose of estimation, the same INDXn/INDXn-1value shall be used for
all years of the Control Period. However, the Commission will consider the actual
values in the INDXn/INDXn-1at the end of each year during the Annual Performance
Review exercise and true up the employee cost and A&G expenses on account of this
variation, for the Control Period;
Note 2: Any variation due to changes recommended by the Pay Commission, wage
revision agreement, etc., will be considered separately by the Commission;
Note 3: Terminal Liabilities will be approved as per actual submitted by the Licensee
along with documentary evidence such as actuarial studies.
10.7
The Distribution Licensee shall submit a detailed break-up of Legal/Litigation Expenses
incurred during the Control Period (FY 2026-27 to FY 2030-31), along with necessary
documentary evidence such as invoices, fee receipts, case references, and proof of
payment. The Commission shall assess the admissibility of such expenses based on the
provisions of the Jharkhand State Litigation Policy and allow recovery of expenses
subject to prudence check at the time of truing-up.
Provided that the legal expenses shall be considered on a case-by-case basis, subject
to prudence check at the time of True-up, and only upon production of valid proof of
payment for the actual amount claimed.
Capital Cost
10.8
The capital cost of the Licensee shall include the following:
25
Jharkhand Gazette (Extraordinary) Thursday 16th October, 2025
a)
Expenditure incurred or projected to be incurred on original scope of work,
including the interest during construction and financing charges, any gain or
loss on account of Foreign Exchange Risk Variation during construction, on the
actual loan up to the date of commercial operation of the scheme, as
admitted by the Commission after prudence check, shall form the basis for
determination of Tariff;
b)
Capitalised initial spares subject to the ceiling norm of 1.5% of the original
project cost.
10.9
The capital cost admitted by the Commission after prudence check shall form the basis
for determination of tariff:
ProvidedthatwheretheCommissionhasgiven‘inprinciple’approvaltotheestimates of scheme capital
cost and financing plan, the same shall be the guiding factor for applying prudence check on the
actual capital expenditure:
Provided further that in case of the existing schemes, the capital cost admitted by the Commission
prior to April 01, 2026andthe additional capital expenditure projected to be incurred for respective
year of the Control Period during FY 2026-27 to FY 2030-31 as may be admitted by the Commission,
shall form the basis for determination of capital cost:
Provided also that any increase in Capital Cost due to time/cost over-run shall only be allowed in case
the Licensee establishes with the support of appropriate documents and facts to the satisfaction of
the Commission that the delay was on account of uncontrollable factors and not attributable to the
Licensee.
10.10 Capital cost to be allowed by the Commission for the purpose of determination of
tariff will be based on the capital investment plan prepared by the Licensee and
approved by the Commission.
10.11 The amount funded through Consumer Contribution, Grants or Deposit Works for
connection to the distribution system of the Licensee shall be deducted from the
original cost of the scheme for the purpose of calculating the amount under debt and
equity under these Regulations.
10.12 Further, in case such cost has been incurred towards replacement or upgradation of
any existing assets, the original cost of the replaced asset shall be reduced and de-
capitalised from the Capital Cost.
Additional Capitalization
10.13 The capitalisation of capital expenses incurred or projected to be incurred, on the
following counts within the original scope of work, after the asset has been put to use
may be admitted by the Commission, subject to prudence check:
a)
Deferred liabilities;
b)
Works deferred for execution;
c)
Liabilities to meet award of arbitration or for compliance of the order or
directions of any statutory authority or order or decree of any court of law;
26
Jharkhand Gazette (Extraordinary) Thursday 16th October, 2025
d)
On account of change in law;
e)
Any additional works/services, which have become necessary for efficient and
successful operation of the scheme, but not included in the original scheme
cost;
f)
Capital Expenses incurred due to Force Majeure conditions;
g)
Less: De-Capitalisation of replaced/upgraded assets, if any; and
h)
Less: Assets not put to use;
Provided that the details of work included in the original scope of work, along with
estimates of expenditure, undischarged liabilities and works deferred for execution,
shall be submitted along with the application for determination of tariff after the date
of commercial operation of the scheme.
10.14 In case of de-capitalisation of assets of a Distribution Licensee, the original cost of such
asset as on the date of decapitalization duly certified by its Statutory Auditor shall be
deducted from the value of gross fixed asset and corresponding outstanding loan on
such assets as well as equity shall be deducted from loan and the equity balances
respectively. Such deductions shall be carried out in the year such de- capitalisation
takes place with corresponding adjustments in cumulative depreciation and
cumulative repayment of loan shall be carried out duly taking into consideration the
year in which it was capitalised.
10.15 Impact of additional capitalisation within the approved scheme cost on tariff shall be
considered by the Commission during the Annual Performance Review:
Provided that avenues for monetisation of the asset base may be explored as part of
the overall scheme planning, and a detailed study identifying such avenues shall be
undertaken and submitted to the Commission for approval, through a Petition, prior
to implementation. Such monetisation measures shall, under no circumstances,
compromise grid security, grid safety, or the integrity and reliability of the distribution
system.
Provided that the Commission may consider any new scheme proposed on merits
subject to prudence check as per this Tariff Regulation.
Debt-EquityRatio
10.16 Existing Schemes - In case of capital expenditure schemes capitalised prior to April 01,
2026, the debt-equity ratio as allowed by the Commission for determination of tariff
for the period ending March 31, 2026, shall be considered.
10.17 New Schemes–For capital expenditure schemes to be capitalizedafterApril01,2026:
a)
A normative debt-equity ratio of swenty : thirty (70:30) shall be considered for
the purpose of determining of Tariff;
b)
In case the actual equity employed is in excess of thirty percent (30%), the
amount of equity for the purpose of tariff determination shall be limited to
thirty percent (30%), and the balance amount shall be considered as a
27
Jharkhand Gazette (Extraordinary) Thursday 16th October, 2025
normative loan;
c)
In case the actual equity employed is less than thirty percent (30%),the actual
debt-equity ratio shall be considered;
d)
The premium, if any raised by the Licensee while issuing share capital and
investment of internal accruals created out of free reserve, shall also be
reckoned as paid up capital for the purpose of computing return on equity,
provided such premium amount and internal accruals are actually utilized for
meeting capital expenditure.
Note 1: Any expenditure admitted on account of committed liabilities within the
original scope of work and the expenditure deferred on techno-economic grounds but
falling within the original scope of work shall be serviced in the normative debt- equity
ratio specified in these Regulations;
Note 2: Any expenditure on replacement of old assets or on renovation and
modernization or life extension shall be considered on normative debt-equity ratio
specified in these Regulations after writing off the entire book value of the original
assets from the capital cost of the new asset;
Note 3: Any expenditure admitted by the Commission for determination of tariff on
account of new works not in the original scope of work shall be serviced in the
normative debt-equity ratio specified in these Regulations.
10.18 The Licensee shall submit the resolution of the Board of the Company or approval of
the competent authority in other cases regarding infusion of funds from internal
resourcesinsupportoftheutilizationmadeorproposedtobemadetomeetthecapital
expenditure of the Distribution Licensee.
Return on Equity
10.19 The base rate of Return on Equity (RoE) shall be 14.50% (post-tax) for assets
capitalised prior to April 01, 2026
and
15.00% (post-tax) for assets capitalized from April 01, 2026, provided that in addition
to the base RoE, the Commission may allow an additional 0.50% RoE for assets
capitalized from April 01, 2026,to the Distribution Licensee that demonstrably ensures
uninterrupted supply of electricity to Universal Supply Obligated Entities, including,
but not limited to, Religious Institutions, Government Hospitals, Educational
Establishments, Public Water Supply and Sanitation Services, Street Lighting Systems,
critical infrastructure facilities, and renewable energy integration projects, eligibility
for such additional RoE shall be linked to specific, measurable Key Performance
Indicators (KPIs), including but not limited to SAIDI, SAIFI, outage duration, and supply
reliability percentage to the above categories, asverified through independent
certification by the State Load Despatch Centre (SLDC) and/or a Statutory Auditor or
any third-party agency as approved by the Commission.
10.20 The Licensee to provide Return on equity for each year shall be allowed on equity
employed in assets in use considering the following:
28
Jharkhand Gazette (Extraordinary) Thursday 16th October, 2025
a)
EquityemployedinaccordancewithClause10.16oftheseRegulationson assets (in
use) capitalised as on the beginning of the year; and
b)
Fifty Percent (50%)of the equity projected to be employed in accordance with
Clause 10.17of these Regulations on assets (in use) Commissioned during the
year.
The Distribution Licensee shall furnish all requisite data, information, and supporting
documents pertaining to the respective Financial Year by 30thNovember of the year in
which the Petition is to be filed. Non-submission of the complete data within the
stipulated timeline shall render the Licensee ineligible to claim carrying cost for the
corresponding period, unless condoned by the Commission with recorded reasons.
Interest on Loan Capital
10.21 The loans arrived at in the manner indicated in Clauses10.16 and 10.17 shall be
considered as gross normative loan for calculation of interest on loan.
10.22 The normative loan outstanding as on April 01, 2026 shall be worked out as the gross
loan by deducting the cumulative repayment as admitted by the Commission up to
March 31, 2025 from the gross normative loan.
10.23 The repayment for each year of the Control Period shall be deemed to be equal to the
depreciation allowed for that year.
10.24 In case of de-capitalization of assets, the repayment shall be adjusted by taking into
account cumulative repayment on pro-rata basis and the adjustment should not
exceed cumulative depreciation recovered up to the date of de-capitalization of such
assets.
10.25 Notwithstanding any moratorium period availed by the Licensee, the repayment of
loan shall be considered from the first year of operation of the scheme/asset.
10.26 The rate of interest shall be the weighted average rate of interest calculated on the
basis of the actual loan portfolio at the beginning of each year applicable to the
Licensee:
Provided that Rate of Interest shall not exceed Bank Rate as on April 01 of the respective
year of the Control Period plus two hundred (200) basis points.
Provided that if there is no actual loan for a particular year but normative loan is still
outstanding, then the rate of interest shall be considered on normative basis and shall be
equal to the Bank Rate as on April 01of the respective year of the Control Period plus two
hundred (200) basis points.
10.27 The interest on loan shall be calculated on the normative average loan of the year by
applying the weighted average rate of interest.
10.28 The above interest computation shall exclude interest on loan amount, normative or
otherwise, to the extent of capital cost funded by Consumer Contribution, Grants or
Deposit Works carried out by Distribution Licensee.
10.29
The Licensee shall make every effort to re-finance the loan as long as it
results in net savings on interest and in that event the costs associated with such re-
29
Jharkhand Gazette (Extraordinary) Thursday 16th October, 2025
financing shall be borne by the users and the net savings shall be shared between the
users and the Licensee, as the case may be, in the ratio of fifty:fifty (50:50).
Interest on Working Capital
10.30 Working capital for the Wheeling Business for the Control Period shall comprise:
a) Maintenance spares at one percent (1%) of Opening GFA of Wheeling
Business; plus
b) Two months equivalent of the expected revenue from wheeling charges at the
prevailing tariffs; minus
c) Amount, if any, held as security deposits.
10.31 Working capital for the Retail Supply of Electricity for the Control Period shall
comprise:
a) Maintenance spares at one percent (1%) of Opening GFA for Retail Supply
Business;
plus
b) Two months equivalent of the expected revenue from sale of electricity at the
prevailing tariffs;
minus
c) Amount held as security deposits under Clause (a) and Clause (b) of
subsection (1) of Section 47 of the Act from consumers and Distribution
System Users net of any security held for Wheeling Business;
minus
d) One-month equivalent of cost of power purchased including the Inter-State
and Intra-State Transmission Charges and Load Despatch Charges, based on
the annual power procurement plan.
10.32 Rate of interest on working capital shall be equal to the Bank Rates on September 30
of the financial year in which the MYT Petition is filed plus three hundred and fifty
(350) basis points. At the time of true-up, the interest rate shall be adjusted as per the
actual rate prevailing on April 01 of the financial year for which truing up exercise has
been undertaken.
Interest on Consumer Security Deposits
10.33 The interest payable on consumer security deposits shall be governed by the
provisions of the Jharkhand State Electricity Regulatory Commission (Electricity Supply
Code) Regulations, 2015, as amended by the First Amendment Regulations, 2018, and
the Second Amendment Regulations, 2024, or as may be further amended or
substituted by the Commission from time to time.
Depreciation
10.34 Depreciation shall be calculated for each year of the control period on the original cost
of the fixed assets of the corresponding year as admitted by the Commission:
30
Jharkhand Gazette (Extraordinary) Thursday 16th October, 2025
Provided that depreciation shall not be allowed on assets funded by Consumer Contribution and
Capital Subsidies/Grants. Provision for replacement of such assets shall be made in the Capital
Investment Plan.
10.35 Depreciation for each year shall be determined based on the methodology as specified
in these Regulations along with the rates and other terms specified.
10.36 Depreciation shall be calculated annually, based on the straight-line method at the
rates specified at Appendix-I. The base value for the purpose of depreciation shall be
original cost of the asset:
Provided that the Distribution Licensee shall ensure that once the individual asset is depreciated to
the extent of seventy (70) percent of the Book Value of that asset, remaining depreciable value as on
March 31 of the year closing shall be spread over the balance useful life of the asset.
10.37 Depreciation shall be charged from the first year of commercial operation of the asset.
In case, the operation of the asset is for a part of the year, depreciation shall be
charged on a pro-rata basis.
10.38 The residual value of assets shall be considered as ten percent (10%) and depreciation
shall be allowed to a maximum of ninety percent (90%) of the original cost of the
asset. Land is not a depreciable asset and its cost shall be excluded while computing
ninety percent (90%) of the original cost of the asset.
Provided that the salvage value for IT equipment and software shall be considered as
NIL and hundred percent (100%) value of the assets shall be considered depreciable;
10.39 The Commission may, in the absence of the Fixed Assets Register, calculate
Depreciation in percentage(%) arrived by dividing the Depreciation and the Average
Gross Fixed Assets as per the latest available Audited Accounts of the Distribution
Licensee. The Depreciation (%) so arrived shall be multiplied by the Average GFA
approved by the Commission for the relevant Financial Year to arrive at the
Depreciation for that Financial Year.
10.40 In case of de-capitalization of assets, the cumulative depreciation shall be adjusted by
taking into account the depreciation recovered through tariff corresponding to the
decapitalised asset during its useful services.
Cost of Power Procurement
10.41 Quantum of Power Purchase: The Commission approved category-wise sales forecast
shall be used along with the distribution loss trajectory for estimating the Licensees’
power procurement requirement for each year.
10.42 The Licensee shall be allowed to recover the net cost of power it procures from
sources approved by the Commission, viz,intra-State and inter-State Trading Licensees,
Bilateral Purchases, Bulk Suppliers, State Generating Stations, Independent Power
Producers, Central Generating Stations, non-conventional energy generators,
generation business of the Licensee and others, assuming maximum normative rebate
available from each source for payment of bills:
31
Jharkhand Gazette (Extraordinary) Thursday 16th October, 2025
Provided that the Licensee shall propose the cost of power procurement taking into
account the latest available Energy Charge Rate incurred in the ongoing year
consideringthe Fuel Price Adjustment formula specified for the generating stations in
the Jharkhand State Electricity Regulatory Commission(Terms and Conditions for
Determination of Generation Tariff) Regulations, 2025 and any amendments thereof
and net revenues earned by sales of surplus power through bilateral exchanges and
Unscheduled Interchange (UI) transactions:
Provided further that where the Licensee utilises a part of the approved power
purchaseorbulksupplyallocatedorcontractedfortheRetailSupplyBusinessforitsTrading
Business, the Licensee shall provide an Allocation Statement clearly specifying the
source wise cost of power purchase that is attributable to such trading activity
ensuring that only the unscheduled power after following merit order Dispatch
available during that time period has been traded as surplus power.
10.43 While approving the cost of power purchase, the Commission shall determine the
quantum of power to be purchased from various sources in accordance with the
principles of merit order Dispatch based on a ranking of all approved sources of supply
in the order of their variable cost of power purchase. All power purchase costs will be
considered legitimate unless it is established that the merit order principle has been
violated or power has been purchased at unreasonable rates.
10.44 The estimated revenue from the sale of surplus power, if any, shall be reduced from
the gross power purchase cost for estimating the net power purchase cost in the ARR.
10.45 The Licensee shall be obligated to comply with the Renewable Purchase Obligation in
accordance with the provisions of the Jharkhand State Electricity Regulatory
Commission (Renewable Energy Purchase Obligation and its Compliance) Regulations,
2016, as amended by the First Amendment Regulations, 2021, and the Second
Amendment Regulations, 2024, or as may be further amended or, substituted by the
Commission from time to time.
10.46 Any variation in cost of power, supplied to consumers, due to change in Fuel cost,
power purchase cost and transmission charges with reference to cost of supply
approved by the Commission, for reasons beyond the control of the Licensee, shall be
allowed to be recovered by way of FPPAS as per the mechanism specified from Clause
10.67 to Clause 10.74Eof these Regulations.
Distribution Losses
10.47 The Licensee shall file the distribution loss trajectory for the entire Control Period in
the Business Plan, commensurate with the Capital Investment Plan for each year of the
Control Period,for approval of the Commission after verification and evaluation of the
same.
10.48 The Licensee shall also propose voltage-wise losses for each year of the Control Period
for the determination of voltage-wise cost of supply and determination of voltage-
wise Wheeling Tariff.
32
Jharkhand Gazette (Extraordinary) Thursday 16th October, 2025
Transmission, Load Dispatch & Wheeling Charges
10.49 The Licensee shall be allowed to recover net transmission and load Dispatch charges
payable to the Transmission Licensees(inter-State Transmission Licensee, State
Transmission Licensee, etc.) and System Operators (Regional Load Dispatch Centre,
State Load Dispatch Centre, etc.) for access to and use of the inter-State transmission
system, intra-State transmission system and availing load Dispatch services assuming
maximum normative rebate available from each source for payment of bills on
presentation of bills in accordance with the tariffs approved from time to time by
Central Electricity Regulatory Commission and the appropriate State Commission, as
the case may be.
10.50 The Licensee shall also be allowed to recover the Wheeling Charges during the Control
Period, in case the distribution network of other Licensee is used for procurement of
power for the Retail Supply Business.
Income Tax
10.51 Tax on income, if any, on the Licensed business of the Licensee shall be limited to tax
on the allowed return on equity.
10.52 The income tax actually payable or paid limited to the tax on allowed return on equity
shall be included in the ARR while truing up. The actual assessment of income tax
should take into account benefits of tax holiday, and the credit for carry forward losses
applicable as per the provisions of the Income Tax Act, 1961 and its amendments
thereof shall be passed on to the consumers. Tax on the other income streams of the
Distribution Licensee shall not be recovered from the Beneficiaries.
Non-TariffIncome
10.53 The amount of Non-Tariff Income relating to the Distribution Business as approved by
the Commission shall be deducted from the ARR in determining the Retail Supply Tariff
and Wheeling Charges of the Distribution Business:
Provided that the Distribution Licensee shall submit full details of its forecast of Non- Tariff Income to
the Commission in such form as may be stipulated by the Commission.
10.54 The Non-Tariff Income shall include:
a) Income from rent of land or buildings;
b) Income from sale of scrap;
c) Income from investments;
d) Interest accrued on advances to suppliers/contractors;
e) Interest income on loans/advances to employees;
f) Income from rental of staff quarters;
g) Income by rental from contractors;
h) Income by hire charges from contactors and others;
33
Jharkhand Gazette (Extraordinary) Thursday 16th October, 2025
i) Income from delayed payment surcharge, supervision charges,etc.;
j) Supervision charges for capital works;
k) Income from recovery against the ft and/or pilferage of electricity;
l) Income from advertisements;
m) Income from sale of tender documents;
n) Profit from sale of Assets(i.e.difference of Sale value and Book valueofAsset);
o) Any other Non-Tariff Income:
Provided that the interest earned from investments made out of Return on Equity
corresponding to the regulated Business of the Distribution Licensee shall not be
included in Non-Tariff Income.
Provided that the onus to substantiate, to the satisfaction of the Commission, that
such investments have been out of Return on Equity shall be on the Licensee.
Income from Other Business
10.55 Where the Licensee is engaged in any Other Business under Section 51 of the Act for
optimum utilisation of its assets and/or manpower of its Regulated Business, the
income from such business will be calculated considering the following conditions:
1. The Licensee shall not in any manner utilize the assets and facilities of the
Licensed Business or otherwise directly or indirectly allow the activities to be
undertaken in a manner that it results in the Licensed Business subsidising the
Other Business in any manner;
2. The Licensee shall not in any manner, directly or indirectly, encumber the
assets and facilities of the Licensed Business for the other Business or for any
activities other than the Licensed Business;
3. The Licensee shall duly pay for all costs accounted for in the Licensed Business,
which have been incurred for Other Business and in the event of such cost
being incurred commonly for both the Licensed Business and Other Business,
apportion such cost and ensure due payment of apportioned costs to the
Licensed Business from the Other Business;
4. The revenue derived from the Other Business shall be commensurate with
prevailing market conditions for such similar business activities;
5. In addition to the sharing of costs undersub-clause3 above, the Licensee shall
account for and ensure due payment to the Licensed Business a certain
proportion of revenues from the other Business. As a general principle, the
Licensee shall retain fifty percent (50%) of the revenues arising on account of
Other Business and pass on the remaining fifty percent (50%) of the revenues
to the Consumers.
10.56 The revenue from Other Business shall be deducted from the ARR in calculating the
revenue requirement of the Licensee:
34
Jharkhand Gazette (Extraordinary) Thursday 16th October, 2025
Provided that the Licensee shall follow a reasonable basis for allocation of all joint and
common costs between the Distribution Business and the Other Business and shall submit the
Allocation Statement as approved by the Board of Directors to the Commission along with his
application for determination of tariff:
Provided further that where the sum total of the direct and indirect costs of such Other Business
exceeds the revenues from such Other Business, no amount shall be allowed to be added to the ARR
of the Licensee on account of such Other Business.
Lease charges
10.57 Lease charges for assets taken on lease by the Licensee shall be considered as per the
lease agreement, provided they are considered reasonable by the Commission.
Foreign Exchange Rate Variation
10.58 The Licensee shall hedge foreign exchange exposure in respect of the interest on
foreign currency loan and repayment of foreign loan acquired by the Licensee.
10.59 The Licensee shall recover the cost of hedging of foreign exchange rate variation
corresponding to the normative foreign debt,in the relevant year on year-to-year basis
as expense in the period in which it arises and extra rupee liability corresponding to
such foreign exchange rate variation shall not be allowed against the hedged foreign
debt.
10.60 The Licensee shall recover the cost of hedging and foreign exchange rate variation on
a year-to-year basis as income or expense in the period in which it arises.
Recovery of ARR
10.61 The Recovery of Fixed Charges approved in the Tariff Order shall be based on the
actual hours of supply as recorded in the Consumer’s Meter. The Commission, in its
MYT/Tariff Orders shall stipulate the minimum hours of supply for HT and LT
Consumers for complete recovery of Fixed Charges from such Consumers. The
recovery of Fixed Charges shall be in proportion to the stipulated minimum hours of
supply:
Provided that the reduction in Fixed Charges to be recovered so calculated shall be
treated as disallowance due to reduced hours of supply and the same shall not be
allowed to be recovered in the ARR of the Distribution Licensee:
Provided further that if the actual hours of supply are equal to or higher than the
minimum hours of supply for HT and LT Consumers for complete recovery of Fixed
Charges, then the Distribution Licensee shall recover the complete Fixed Charges.
Illustration: If the Commission has approved the minimum hours of supply of
23 hours, and Fixed Charges of Rs. 350/ kVA/ Month for any HT Consumer, and the
actual average hours of supply is 22 hours per day for such consumer in any month,
the Fixed Charges recoverable by the Distribution Licensee for such Consumer shall be
calculated as below:
35
Jharkhand Gazette (Extraordinary) Thursday 16th October, 2025
Fixed Charges Recoverable=22/23*350=Rs.334.78/kVA/Month
Cross-Subsidy Surcharge
10.62 The surcharge payable by consumers opting for open access on the network of the
Licensee will be determined by the Commission as per the following formula:
S=T-[C/(1–(L/100))+D+R]
Where,
S is the surcharge;
T is the Tariff payable by the relevant category of consumers, including reflecting the Renewable
Purchase Obligation;
C is the per unit weighted average cost of power purchase by the Licensee, including meeting the
Renewable Purchase Obligation;
D is the aggregate of transmission, distribution and wheeling charge applicable to the relevant
voltage level;
L is the aggregate of transmission, distribution and commercial losses, expressed as a
percentage applicable to the relevant voltage level;
Risthe per unit cost of carrying regulatory assets:
Provided that the surcharge, determined by the Commission under clause (a) of sub-
section (1) of the section 86 of the Electricity Act, 2003 shall not exceed twenty
percent (20%)of the Average Cost of Supply (ACoS).
Additiona lSurcharge on Charges of Wheeling
10.63 Additional Surcharge shall be determined on a ‘case to case’ basis and shall be payable
only if the Licensee is able to conclusively demonstrate the incidence of any stranded
costs.
10.64 Cross-Subsidy Surcharge and Additional Surcharge shall be shown as revenue from
tariff from the consumer categories, which are permitted open access, and such
amount shall be utilized to meet the cross-subsidy requirements of subsidised
categories and fixed costs of the Licensee arising out of his obligation to supply. The
Licensee shall provide the details in its MYT filings based on the actuals during the
previous Control Period and submit annual filings during the Control Period.
Fuel Price and Power Purchase Adjustment(FPPPA)
10.65 The Fuel and power purchase adjustment surcharge (FPPAS) formula has been
provided as specified under sub-section (4) of section 62 of the Act, for
recovery/adjustment of increase or decrease in power purchase cost on monthly
basis.
10.66 Fuel and power purchase adjustment surcharge shall be calculated and billed by the
Distribution Licensee to consumers, automatically, without going through regulatory
approval process, on a monthly basis, according to the formula, prescribed by the
36
Jharkhand Gazette (Extraordinary) Thursday 16th October, 2025
Commission, subject to true up, on an annual basis:
Provided that the automatic pass through shall be adjusted for monthly billing in accordance
with these Regulations.
10.67 Fuel and Power Purchase Adjustment Surcharge shall be computed and charged by the
distribution Licensee, in the (n + 2)th month, on the basis of actual variation, in the cost
of fuel and power purchase and Interstate Transmission Charges for the power
procured during the nth month. For example, the fuel and power purchase adjustment
surcharge on account of changes in tariff for power supplied during the month of April
of any year shall be computed and billed in the month of June of the same financial
year:
Provided that in case the distribution Licensee fails to compute and charge fuel and power
purchase adjustment surcharge within this time line, except in case of any force majeure
condition, its right for recovery of costs on account of fuel and power purchase adjustment
surcharge shall be forfeited and in such cases, the right to recover the fuel and power
purchase adjustment surcharge determined during true-up shall also be forfeited.
10.68 The distribution Licensee may decide, fuel and power purchase adjustment surcharge
or a part thereof, to be carried forward to the subsequent month in order to avoid any
tariff shock to consumers, but the carry forward of fuel and power purchase
adjustment surcharge shall not exceed a maximum duration of two months and such
carry forward shall only be applicable, if the total fuel and power purchase adjustment
surcharge for a Billing Month, including any carry forward of fuel and power purchase
adjustment surcharge over the previous month exceeds twenty per cent of variable
component of approved tariff.
10.69 The carry forward shall be recovered within one year or before the next tariff cycle
whichever is earlier and the money recovered through fuel and power purchase
adjustment surcharge shall first be accounted towards the oldest carry forward
portion of the fuel and power purchase adjustment surcharge followed by the
subsequent month.
10.70 In case of carry forward of fuel and power purchase adjustment surcharge, the
carrying cost at the Bank Rate plus one hundred fifty (150)basis points shall be allowed
till the same is recovered through tariff and this carrying cost shall be trued up in the
year under consideration.
10.71 Depending upon the quantum of fuel and power purchase adjustment surcharge, the
automatic pass through shall be adjusted in such a manner that,
i.
If fuel and power purchase adjustment surcharge is up tofive percent (5%),
hundred percent(100%) cost recoverable of computed fuel and power purchase
adjustment surcharge by Distribution Licensee shall be levied automatically using
the formula.
ii. If fuel and power purchase adjustment surcharge is more than five percent (5%),
five percent (5%) fuel and power purchase adjustment surcharge shall be
recoverable automatically as per Sub-Regulation (i) above ninety percent (90%) of
the balance fuel and power purchase adjustment surcharge shall be recoverable
37
Jharkhand Gazette (Extraordinary) Thursday 16th October, 2025
automatically using the formula, and the differential claim shall be recoverable
after approval by the Commission during true-up.
10.72 The revenue recovered on account of pass-through fuel and power purchase
adjustment surcharge by the Distribution Licensee, shall be trued up later for the year
under consideration and the true up for any financial Year shall be completed within
one twenty days (120) days after date of acceptance of Petition by the Commission.
10.73 In case of excess revenue recovered for the year against the fuel and power purchase
adjustment surcharge, the same shall be recovered from the Distribution Licensee at
the time of true up along with its carrying cost to be charged at 1.20 times of the
carrying cost rate approved by the Commission and the under recovery of fuel and
power purchase adjustment surcharge shall be allowed during true up, to be billed
along with the automatic Fuel and Power Purchase Adjustment Surcharge amount.
Explanation: For example, in the month of July, the automatic pass through component for
the power supplied in May and additional Fuel and Power Purchase Adjustment Surcharge, if
any, recoverable after true up for the month of April in the previous year, shall be billed.
10.74 A)Distribution Licensee shall submit such details, in the stipulated formats, of the
variation between expenses incurred and the fuel and power purchase adjustment
surcharge recovered, and the detailed computations and supporting documents, as
required by the Commission, during true up of the normal tariff.
B)To ensure smooth implementation of the fuel and power purchase adjustment
surcharge mechanism and its recovery, the Distribution Licensee shall ensure that its
billing system is updated to take this into account and a unified billing system shall be
implemented to ensure that there is a uniform billing system irrespective of the billing
and metering vendor through interoperability or use of open source software as
available
The Distribution Licensee shall publish all details including the fuel and power purchase
adjustment surcharge formula, calculation of monthly fuel and power purchase adjustment
surcharge and recovery of fuel and power purchase adjustment surcharge (separately for
automatic and approved portions) on its website and archive the same through a dedicated
web address.
C)Computation of Fuel and Power Purchase Adjustment Surcharge: The formula for
Computation of Fuel and Power Purchase Adjustment Surcharge (FPPAS) in percentage (%)
for
nth month is as follows:
Monthly FPPAS for nth Month in percentage (%) =
ܯ݊ݐℎ݈ݕ ܨܲܲܣܵ ݂ݎ ݐℎ݁ ݊ݐℎ ܯ݊ݐℎ (%) =
(ܣ−ܤ) × ܥ+ (ܦ−ܧ)
ܼ × ቀ1 −ܦ݅ݏݐݎܾ݅ݑݐ݅݊ ݈ݏݏ݁ݏ ݅݊ %
100
ቁ× ܣܤܴ
38
Jharkhand Gazette (Extraordinary) Thursday 16th October, 2025
‘nth’ month means the month in which billing of fuel and power purchase adjustment
surcharge component is done. This fuel and power purchase adjustment surcharge is due to
changes in tariff for the power supplied in (n-2)th month;
‘A’ is Total units procured in (n − 2)th Month (in kWh) from all Sources including Long-term,
Medium–term and Short-term Power purchases (To be taken from the bills issued to
Distribution Licensee);
‘B’ is bulk sale of power in (n − 2)th Month (in kWh)= (to be taken from provisional accounts
to be issued by State Load Dispatch Centre by the 10thday of each month);
‘C’ is incremental Average Power Purchase Cost= Actual average Power Purchase Cost (PPC)
from all Sources in (n − 2)th month (₹/kWh) (computed) - Projected average Power Purchase
Cost (PPC) from all Sources (₹/kWh)(from tariff order);
‘D’ is the Actual inter-state and intra-state Transmission Charges in the (n − 2)thMonth, (From
the bills by Transmission Licensees to Distribution Licensee) (in ₹);
‘E’ is the Base Cost of Transmission Charges for (n − 2)th Month = (Approved Transmission
Charges/12) (in ₹);
‘Z’ = [{Actual Power purchased from all the sources outside the State in (n − 2)th Month(in
kWh) * (1 – Inter-state transmission losses in % /100) + Power purchased from all the sources
within the State (in kWh)}*(1 – Intra-state losses in % /100) – B] in kWh;
‘ABR’ is the Average Billing Rate for the year (to be taken from the Tariff Order in ₹/kWh);
‘Distribution
Loss (in %)’ is the Target Distribution Losses (from Tariff Order);
‘Inter-state transmission Losses (in %)’is the approved Inter-state transmission Losses as per
Tariff Order;
‘Intra-state transmission Losses (in%)’ is the approved Intra-state transmission Losses as per
Tariff Order;
D)The Power Purchase Cost shall exclude any charges on account of Deviation
Settlement Mechanism.
E)Other charges which include Ancillary Services and Security Constrained Economic
Dispatch shall not be included in Fuel and Power Purchase Adjustment Surcharge and
shall be adjusted though the true-up approved by the Commission.
Late Payment Surcharge
10.75 In the event of delayed payment or non-payment of any bill raised by the Distribution
Licensee towards the retail supply of electricity, the consumer shall be liable to pay
Late Payment Surcharge (LPS) on the outstanding billed amount, including applicable
taxes, cess, duties, and statutory levies, beyond the following due dates:
i.
High Tension (HT) and Extra High Tension (EHT) consumers – 15 (fifteen) days
from the date of billing.
ii.
Low Tension (LT) consumers – 21 (twenty-one) days from the date of billing.
10.76 The rate of Late Payment Surcharge shall be:
i.
For Delay beyond the respective due date till sixty days (60 days)– LPS shall be
levied at twelve percent (12%) per annum on the outstanding amount,
calculated on a simple interest basis.
ii.
For delay beyond sixty days (60) days and up to ninety (90) days – interest on
39
Jharkhand Gazette (Extraordinary) Thursday 16th October, 2025
delayed payment shall be levied at fourteen percent (14%) per annum over
and above the escalated cost as per Clause 10.76(i)for days beyond 60 days, on
a simple interest basis, on the cumulative outstanding, including accrued LPS
and statutory charges.
iii.
For delay exceeding ninety (90) days – interest shall be levied at sixteen
percent (16%) per annum over and above the escalated cost as per Clause
10.76(ii) for days beyond ninety (90)days, on a simple interest basis, on the
total outstanding, including accrued LPS and statutory charges.
10.77 LPS and interest shall accrue until full and final settlement of dues. The charges shall
be non-compounding unless otherwise specified by the Commission in specific
circumstances.
10.78 These provisions shall override any contrary terms in existing Power Supply
Agreements or bilateral arrangements. However, where a lower LPS is contractually
agreed upon, the same shall prevail, subject to prior approval of the Commission.
10.79 Payments received from consumers shall be time-stamped and appropriated in the
following order:
i.
First, against accrued Late Payment Surcharge;
ii.
Thereafter, against the oldest outstanding principal billed amount, starting
from the longest overdue bill.
Illustrative Example:
A consumer is billed an amount of Rs. 1,00,000 on 1 July. In accordance with the
provisions of Clause 10.75, the applicable due date shall be 15 July for an EHT
consumer and 21 July for an LT consumer, during which no Late Payment
Surcharge (LPS) shall accrue. In the event the consumer effects payment on 20
October, the computation of LPS shall be as follows:
For a HT & EHT consumer, the first slab of LPS at 12% per annum shall apply after
the expiry of the 15‑day grace period, i.e., from 16 July to 29 August (45 days
within the 60-day slab), resulting in an LPS of approximately Rs. 1,479.
Thereafter, for the subsequent 30‑day period from 30 August to 28 September,
LPS shall be levied at 14% per annum on the cumulative outstanding (i.e., principal
plus accrued LPS from the previous slab), resulting in an additional LPS of
approximately Rs. 1,168.
For the delay beyond 90 days from the bill date, i.e., from 29 September to 20
October (22 days), interest at 16% per annum shall be levied on the cumulative
amount (i.e., principal plus LPS from slabs 1 and 2), resulting in an LPS of
approximately Rs. 964.
Accordingly, the total amount payable on 20 October shall be Rs. 1,03,611, which
shall first be appropriated towards LPS and thereafter towards the principal billed
amount in accordance with Clause 10.79.
40
Jharkhand Gazette (Extraordinary) Thursday 16th October, 2025
For a LT consumer, the applicable due date is 21 July. Accordingly, the first slab of
LPS at 12% per annum shall apply post the expiry of the 21-day grace period, i.e.,
from 22 July to 29 August (39 days), resulting in an LPS of approximately Rs. 1,282.
For the subsequent 30‑day period, i.e., from 30 August to 28 September, LPS shall
be levied at 14% per annum on the cumulative outstanding (i.e., principal plus
accrued LPS from the first slab), resulting in an additional LPS of approximately Rs.
1,165.
For the delay beyond 90 days, i.e., from 29 September to 20 October (22 days),
LPS shall be levied at 16% per annum on the cumulative amount (i.e., principal
plus LPS from the previous two slabs), resulting in an additional LPS of
approximately Rs. 964.
Accordingly, the total amount payable on 20 October shall be Rs. 1,03,412, which
shall first be appropriated towards LPS and thereafter towards the principal billed
amount in accordance with Clause 10.79.
Prompt Payment Rebate
10.80 For payment of bills by the Consumers (Capacity Charge and Energy Charges) within
five (5) days of presentation of bills by the Distribution Licensee, a rebate of two
percent (2.00%) shall be allowed.
Note: In case of computation of five (5) days, the number of days shall be counted
consecutively without considering any holiday. However, in case the last day or 5th day is
official holiday, the 5th day for the purpose of Rebate shall be construed as the immediate
succeeding working day (as per the official State Government’s calendar, where the Office of
the Authorized Signatory or Representative of the Beneficiary, for the purpose of receipt or
acknowledgement of Bill is situated).
Treatment of Load Factor for Load Factor Rebate
10.81 The Commission may direct certain class of consumers to maintain load factor at a
stipulated level, as may be decided by the Commission, and allow incentive or impose
penalty through rebate or surcharge for maintaining load factor above or below the
stipulated level, as the case may be.
10.82 For the purpose of calculation of load factor rebate, the load factor of a consumer
shall be determined in accordance with the following formula:
Load Factor (%) =
୬ୣ୰୷ େ୭୬ୱ୳୫ୣୢ ୧୬ ୩୦/୩୦ ୭୰ ୲୦ୣ ୠ୧୪୪୧୬ ୮ୣ୰୧୭ୢ ୶ ଵ
(ୌି ∑ୌ୧) ×ୈା ∑(ୌ୧ ୶ ୖୈ୧)
Where,
H = Total Hours in the billing period
MD = Maximum Demand (in kW or kVA) for Load Factor Calculation
= Recorded maximum demand in the billing period or eighty-five (85%) of the
contract demand whichever is higher
41
Jharkhand Gazette (Extraordinary) Thursday 16th October, 2025
Hi = The duration involved for ith incidence of interruption / total shed/ partial restriction
onload in supplying power to the consumer by the licensee as specified under10.83of these
regulations
RDi= Restricted load imposed on the consumer corresponding to ith incidence or actual
drawlduring the period of such restriction whichever is higher.
10.83 The computation of load factor shall exclude that period which is a part of the
concerned billing period and when load of the consumer is interrupted/ totally shed /
partially restricted because of any fault of the licensee in its system or for non-
availability of power with the licensee due to lower supply of electricity from its own
generating source or its other suppliers of power or due to imposition of restriction on
load by the licensee on drawl of power by its consumer. Such interruption shall also
include the interruption caused by the grid failure or automatic under frequency relay
tripping or any force majeure event not related to licensee.
10.84 For the purpose of load factor calculation as provided in regulation 10.82 of these
regulations, the following principles shall be followed:
i.
If Maximum Demand (MD) is in KVA, it shall be converted into KW by using the
formula: KW = KVA X PF, where PF is the power factor.
ii.
If RDi is in KVA, it shall be converted into KW by using the formula: KW = KVA X
PF, where PF is the power factor.
iii.
PF shall be considered as average power factor of the month when 85% or less of
the contract demand is recorded maximum demand.
iv.
When maximum demand (MD) represents actual recorded maximum demand,
which is higher than 85% of contract demand, PF will be the actual average
power factor of the time block corresponding to the period of recording the
maximum demand.
v.
For total shedding or interruption, RDi shall be considered as zero.
Voltage Rebate
10.85 All Consumer shall be eligible for a rebate on energy charges, based on the voltage
level at which they are actually connected irrespective of the voltage level prescribed
in the clause 4.3 of Jharkhand State Electricity Regulatory Commission (Electricity
Supply Code) Regulations, 2015 as well as voltage rebate/surcharge as per clause 4.5
of JSERC (Electricity Supply Code) Regulations, 2015.
10.86 The applicable rates will be as follows
(i)
Consumers connected at 33 kV will be eligible for a voltage rebate of three
percent (3%) at energy charge.
(ii)
Consumers connected at 132 kV and above will be eligible for a voltage rebate
of three percent (4%) at energy charge.
10.87 The above rebate will be available only on monthly basis and consumer with arrears
shall not be eligible for the above rebate. However, the applicable rebate shall be
allowed to consumers with outstanding dues, wherein such dues have been stayed by
42
Jharkhand Gazette (Extraordinary) Thursday 16th October, 2025
the appropriate Courts.
Other Rebates and Surcharges
10.88 Any other Rebate or Surcharge applicable to the consumers, including but not limited
to Voltage Rebate/Surcharge, Power Factor Rebate/Surcharge, etc., shall be applicable
as specified in the Multi Year Tariff (MYT) / Annual Tariff Orders issued by the
Commission or under the provisions of the Jharkhand State Electricity Regulatory
Commission (Electricity Supply Code) Regulations, 2015, as amended by the First
Amendment Regulations, 2018, and the Second Amendment Regulations, 2024, or as
may be further amended or re-enacted from time to time.
43
Jharkhand Gazette (Extraordinary) Thursday 16th October, 2025
CHAPTERIV:
PROCEDUREFORFILINGOFARRANDTARIFF
A11.Multi-YearTariffFilingProcedure
11.1
The Multi Year Tariff filing shall be submitted as per the provisions in these Regulation
and in the manner as per the provisions of JSERC (Conduct of Business) Regulations,
2024, as amended or re-enacted from time to time.
11.2
TheMultiYearTariffframeworkshallbebasedonthefollowing:
a)
Business Plan for the Wheeling and the Retail Supply Businessof the Licensees
for the entire Control Period as submitted before the Commission for approval,
prior to the start of the Control Period;
b) Multi Year Petition on Licensees’ forecast of expected ARR for each year of the
Control Period, wheeling tariff and retail supply tariff for the first year of the
ensuing Control Period, based on reasonable assumptions of the underlying
financial and operational principles/parameters laid down under these
Regulations, and on the basis of the Business Plan;
c)
The Trajectory for specific parameters, which shall be stipulated by the
Commission for the improvement of the Licensee’s performance through
incentives and disincentives;
d) Annual review of performance which shall be conducted vis-à-vis the approved
forecast and categorization of variations in performance into controllable and
uncontrollable factors.
11.3
The Licensee shall also submit the MYT filing in electronic format to the Commission.
11.4
The
LicenseeshallfiletheMYTPetitionandrelateddocumentsforapprovalofRetail
SupplyBusinessandWheelingBusinessfortheControlPeriodinaccordancewiththe
MYT
framework and the timelines specified in Section A 24of these Regulations, failing
which the Commission may issue the MYT order suo motu;
11.5
The Licensee shall file the MYT Petition for the Retail Supply Business and the
Wheeling Business together with the requisite information of the expenses and
revenue attributable to the respective businesses.
Before the Start of the Control Period
11.6
The Licensee shall file for the Commission’s approval, as per the Timelines specified in
Section A 24, a Business Plan and MYT Petition in accordance with Clauses6.9
to6.15oftheseRegulations.
Annual Tariff Filings for the Control Period
11.7
The Licensee shall file an application for approval of Retail Supply Tariff and Wheeling
Tariff for each year of the Control Period, as per the timelines specified in Section A
24of these Regulations, before the commencement of each year of the Control Period.
11.8
The Licensee shall propose a capacity-based wheeling tariff. The Licensee shall also
44
Jharkhand Gazette (Extraordinary) Thursday 16th October, 2025
specify the distribution losses voltage-wise to provide for adjustment of losses in the
system.
11.9
The filings for wheeling tariff shall contain the following:
a)
The distribution system or network usage forecast for each year of the Control Period
consistent with the Business Plan, trued up values and annual performance;
b)
Revenue Gap or Surplus for each year of the Control Period and tariff proposal for
meeting/adjusting the Revenue Gap or Surplus for each year;
c)
The Operation and Maintenance(O&M)Expenses estimated for the Base Year and the
actuals for the previous Control Period as per the Audited Accounts, together with
forecasts for each year of the Control Period in accordance with Clauses10.3 to 10.6 of
these Regulations;
d)
Proposalforcomputationoftariffsforvoltage-wiseWheelingofelectricityfor each year of
the Control Period, including the losses and the procedure thereof;
e)
Proposal for Non-Tariff Income with item-wise description and details;
f)
Proposal in respect of income from Other Businesses like Consultancy Services,
Convergence, Training Facilities, etc;
g)
Expected Revenue from the proposed Wheeling Tariff including Additional Surcharge,
Cross-Subsidy Surcharge, etc.
11.10 The filings for retail supply tariff shall contain the following:
a)
Licensee shall submit proposal for retail sale of electricity for the consumers pertaining
to Retail Supply Business, which shall include tariffs for each consumer category
including green tariff - slab-wise and voltage-wise- as applicable. The proposed tariff
may also be based on energy charges, demand charges, minimum charges, etc., along
with the tariff rationalization measures;
b)
Revenue Gap/Surplus for each year of the Control Period and tariff proposal for
meeting/adjusting the Revenue Gap/Surplus for each year. This should be based on
the cost of supply for various consumer categories and cross-subsidy reduction road
map;
c)
The Operation and Maintenance(O&M)Expenses estimated for the Base Year and the
actuals for the previous Control Period as per the Audited Accounts, together with
forecasts for each year of the Control Period in accordance with Clauses10.3to 10.6 of
these Regulations;
d)
Proposals for Non-Tariff Income with item-wise description and details;
e)
Each tariff proposal submitted by the Licensee shall be supported with a cost- of-
service model allocating the costs of the Licensed business to each category of
consumers based on voltage-wise costs and losses;
f)
The proposals of the Licensee should demonstrate that the tariffs are progressively
reflecting the cost of supply;
45
Jharkhand Gazette (Extraordinary) Thursday 16th October, 2025
g)
Expected revenue from the proposed retail supply tariff, and other matters considered
appropriate by the Licensee, including incentive schemes to consumers, cross subsidy
surcharge, etc;
h)
TheapplicableFPPPAchargecalculatedaspertheformulamentionedinClause10.74ofthese
Regulations.
A12.DisposalofApplication
12.1
The Commission shall process the filings made by the Licensee in accordance with
these Regulations and Jharkhand State Electricity Regulatory Commission (Conduct of
Business) Regulations, 2024 and its amendments thereof.
12.2
Based on the Licensee’s filings, objections/suggestions from public and other
stakeholders, the Commission may accept the application with such modifications
and/or such conditions as may be deemed just and appropriate and issue, within one
twenty (120) days of the receipt of the application and after considering all suggestions
and objections from public and other stakeholders, an order containing, inter alia,
trued up revenue and cost components for the year preceding the Base Year,
estimation of parameters for the Base Year and determination of ARR and tariff for
retail supply and wheeling business for each year of the Control Period. The Order shall
also contain the approved Business Plan, targets for controllable items and
performance targets for quality of supply for the Control Period.
A13.Periodic Reviews
Review during the Control Period
13.1
To ensure smooth implementation of the Multi-Year Tariff (MYT) Framework, the
Commission may undertake periodic reviews of Licensee’s performance during the
Control Period, to address any practical issues, concerns or unexpected outcomes that
may arise.
13.2
The Licensee shall submit the Annual Performance Review report as part of annual
review on actual performance as per the timelines specified in the Section A 24of
these Regulations to assess the performance vis-à-vis the targets approved by the
Commission at the beginning of the Control Period. This shall include annual
statements of its performance and accounts including audited/authenticated accounts
and the tariff worked out in accordance with these Regulations.
13.3
The Licensee shall also submit the True up of ARR and corresponding tariff adjustments
as per the timelines specified in the Section A 24of these Regulations. The revised
estimates shall be required to true-up the costs on account of uncontrollable
variations, profit sharing mechanism for exceeding the targets, and implementation of
performance framework for quality of supply targets.
13.4
The Commission may also specify any modifications to the forecast of the Licensee for
the remainder of the Control Period, with detailed reasons for the same.
Review at the end of the Control Period
13.5
Towards the end of the Control Period, the Commission shall seek to review whether
46
Jharkhand Gazette (Extraordinary) Thursday 16th October, 2025
theimplementationoftheprincipleslaiddownintheseRegulationshasachievedtheir
intended objectives. While doing this, the Commission shall take into account, among
other things, the industry structure, sector requirements, consumer and other
stakeholder expectations and Licensee’s requirements at that point in time. Depending
on the requirements of the sector to meet the objective of the Act, the Commission
may revise the principles for the next Control Period.
13.6
The commission may conduct comprehensive Regulatory Impact Assessment for the
regulation with the assistance of stakeholders from Jharkhand and other experts of the
sector.
13.7
The end of the Control Period shall be the beginning of the next Control Period and
the Licensee shall follow the same procedure unless specified otherwise by the
Commission.
13.8
The Commission may analyse the performance of the Licensee every year with respect
to the targets set out at the beginning of the Control Period and based on the actual
performance, expected efficiency improvements and other factors prevalent,
determine
the
initial
values
for
the
next
Control
Period.
47
Jharkhand Gazette (Extraordinary) Thursday 16th October, 2025
CHAPTER V:MISCELLANEOUS PROVISIONS
A14.IssueofOrdersandPracticeDirections
14.1
Subject to the provisions of the Act and these Regulations, the Commission may, from
time to time, issue Orders and Practice Directions in regard to the
implementationoftheseRegulationsandproceduretobefollowedonvariousmatters,
which the Commission has been empowered by these Regulations to direct, and
matters incidental or ancillary thereto.
14.2
Notwithstanding anything contained in these Regulations, the Commission shall have
the authority, either suo-motu or on a Petition filed by any interested or affected
party, to determine the tariff of any Applicant.
A15.Non-ComplianceofDirections
15.1
State Load Dispatch Centre may give such directions and exercise such supervision and
control as may be required for ensuring integrated operation of the power system for
achieving maximum economy and efficiency and every Licensee, generating company,
sub-station and any other person connected with the operation of the power system
shall comply with such directions.
15.2
If any Distribution Licensee fails to comply with the directions issued, it shall be liable
to a penalty as per Section 146 of the Electricity Act, 2003.
A16.DisputeResolution
16.1
In case of dispute, any of the parties may make an application in accordance with the
Jharkhand State Electricity Regulatory Commission (Conduct of Business) Regulations,
2024, as amended from time to time, including statutory re-enactment thereof, for
settlement of the dispute.
A17.Powertoremovedifficulties
17.1
In case of any difficulty in giving effect to any of the provisions of this Regulation, the
Commission may by general or special order, issue appropriate directions to
Distribution Licensee(s) etc., to take suitable action, not being inconsistent with the
provisions of the Act, which appear to the Commission to be necessary or expedient
for the purpose of removing the difficulty.
17.2
The Licensees may make an application to the Commission and seek suitable orders to
remove any difficulties that may arise in implementation of these Regulations
A18.Powerof Relaxation
18.1
The Commission may in public interest and for reasons to be recorded in writing, relax
any of the provision of these Regulations.
A19.Interpretation
19.1
If a question arises relating to the interpretation of any provision of these Regulations,
the decision of the Commission shall be final.
48
Jharkhand Gazette (Extraordinary) Thursday 16th October, 2025
A20.SavingofInherentPowersofthe Commission
20.1
Nothing contained in these Regulations shall limit or otherwise affect the inherent
powers of the Commission from adopting a procedure, which is at variance with any of
the provisions of these Regulations, if the Commission, in view of the special
circumstances of the matter or class of matters and for reasons to be recorded in
writing, deems it necessary or expedient to depart from the procedure specified in
these Regulations.
A21.Enquiryand Investigation
21.1
All enquiries, investigations and adjudications under these Regulations shall be done
by the Commission through the proceedings in accordance with the provisions of the
Jharkhand State Electricity Regulatory Commission (Conduct of Business) Regulations,
2024, as amended from time to time.
A22.Powertoamend
22.1
The Commission may from time to time add, vary, alter, suspend, modify, amend or
repeal any provisions of this Regulation.
A23.Savings
23.1
Nothing in these Regulations shall be deemed to limit or otherwise affect the inherent
power of the Commission to make such orders as may be necessary to meet the ends
of justice or to prevent abuse of the process of the Commission.
23.2
Nothing in these Regulations shall bar the Commission from adopting in conformity
with the provisions of the Act a procedure, which is at variance with any of the
provisions of these Regulations, if the Commission, in view of the special
circumstances of a matter or class of matters and for reasons to be recorded in
writing, deems it necessary or expedient for dealing with such a matter or class of
matters.
23.3
Nothing in these Regulations shall, expressly or impliedly, bar the Commission dealing
with any matter or exercising any power under the Act for which no Regulations or
Regulations have been framed, and the Commission may deal with such matters,
powers and functions in a manner it thinks fit.
49
Jharkhand Gazette (Extraordinary) Thursday 16th October, 2025
A24.Summary of Timelines
S.No
Description
Filing of the
Petition along with all
necessary
document by
Furnishing additional
information/document as
sought by the Commission
Disposal of the Petition
1.
Business Plan for the Control
Period and MYT Petition for the
Control Period for FY 2026-27 to
FY 2030-31 with Retail and
Wheeling Tariffs for first year of
the Control Period
November30,
2025
Within
fifteen
(15)
days of issue of the letter
seeking information by the
Commission
Within
one
hundred
and
twenty
(120)days
of
acceptance of the filing
2.
True-Up for the previous year,
Annual Performance Review for
the current year and ARR &
Tariff Determination for the next
year of the Control Period
November 30 of
the financial year
for which APR has
been sought
Within
fifteen
(15)
days of issue of the letter
seeking information by the
Commission
Within
one
hundred
and
twenty (120)
days
of
acceptance of the filing
50
Jharkhand Gazette (Extraordinary) Wednesday 15th October, 2025
APPENDIXI: DEPRECIATION SCHEDULE
Asset Description
Straight Line Depreciation(%)
Land owned under full title
0.00
Land held under lease
2.67
a)for investment in the land
2.67
b)forcost of clearing site
2.67
Assets Purchased New:
Building & civil engineering works
i)Offices & showrooms
2.67
ii)Temporary erection such as wooden structures
100
iii)Roads other than kutcha roads
2.67
iv)Others
2.67
Transformers, transformer (Kiosk)sub-station equipment & other fixed
apparatus(including plant foundations)
i)Transformers(including foundations)havingaratingof100kVA&above
4.22
ii)Others
4.22
Switch gear including cable connections
4.22
Lightning arrestors
4.22
Batteries
12.77
Cables and Duct System
4.22
Over head lines including supports
i)Linesonfabricatedsteeloperatingatvoltageshigherthan66kV
4.22
ii)Linesonsteelsupportsoperatingatvoltageshigherthan13.2kVbutnot
exceeding66kV
4.22
iii)Linesonsteelorreinforcedconcretesupports
4.22
iv)Linesontreatedwoodsupports
4.22
Meters
12.77
Self-propelled vehicles
12.77
Air conditioning plants
i)Static
4.22
ii)Portable
7.60
Office Equipment, Furniture, Internal Wiring and Street Light Fittings
6.33
Apparatus leton hire
i)Other than motors
7.60
ii)Motors
4.22
Communication equipment
6.33
IT Equipment and Software
15.00
51
Jharkhand Gazette (Extraordinary) Thursday 16th October, 2025
Asset Description
Straight Line Depreciation(%)
Any Other Asset not covered above
4.22(or
as
approved
by
the
Commission considering asset life
and residual value)
By Order of the Commission,
R.P.Nayak,
Secretary
Jharkhand State Electricity Regulatory Commission
-----------
Printed & Published by the Superintendent of Jharkhand Government Press, Doranda, Ranchi.
Jharkhand Gazette (Extraordinary) 474-- 50.