झारखÖड गजट
असाधारण अंक
झारखÖड सरकार ɮवारा Ĥकाͧशत
19 अĒहायण, 1947 (श०)
संÉ या – 538 राँची, बुधवार, 10 Ǒदसàबर, 2025 (ई०)
खान एवं भूतȕ िवभाग
--------
अͬधसूचना
10 Ǒदसàबर, 2025
संƥा-ख०िन०(नीित)-01/2024-2887/एम०, --झारखǷ राǛ के अȶगŊत झारखǷ खिनज धाįरत भूिम
उपकर अिधिनयम, 2024 की अनुसूची एवं झारखǷ गजट संƥा-137, िदनांक-20.03.2025 Ȫारा Ůकािशत अनुसूची
को, िवलोिपत करते Šए िनयमावली के तहत गिठत Governing Body की अनुसंशा के उपराȶ The Jharkhand
Mineral Bearing Land Cess Rule, 2024 के िनयम-8(1) के तहत िनɻवत अनुसूची से Ůित̾थािपत िकया जाता है:-
THE SCHEDULE-1
(See Section-2 and Section-3(1))
Sl.
No.
Classification of Mineral bearing land
Rate of Cess
1.
Coal bearing land
Rs. 450/- per metric tonne of coal
dispatch.
2.
Iron Ore & Manganese bearing land
Rs. 600/- per metric tonne of Iron ore
dispatch.
3.
Bauxite bearing land
Non Metallurgical Grade :Rs. 180/-
per metric tonne of bauxite dispatch.
Metallurgical Grade : 2.0% of
London
Metal
Exchange
(Aluminium) price, chargeable on the
contained Aluminium metal in ore
produced for those dispatched for use
in Alumina and Aluminium metal
extraction .
2
झारखÖडगजट(असाधारण) बुधवार, 10 Ǒदसàबर, 2025
2)-
यह अिधसूचना राजपũ मŐ Ůकाशन की ितिथ से Ůभावी होगा ।
झारखǷ राǛपाल के आदेश से,
अरवा राजकमल,
सरकार के सिचव
---------
अधी¢क
अधी¢क, झारखÖड
झारखÖड राजकȧय मुġणालय
राजकȧय मुġणालय, राँची ɮवारा Ĥकाͧशत एवं मुǑġत
राँची ɮवारा Ĥकाͧशत एवं मुǑġत,
झारखÖड गजट
झारखÖड गजट (असाधारण
असाधारण)
) 538 – 50
4.
Limestone bearing land
Rs. 100/-
per metric tonne of
limestone dispatch.
5.
Gold
Primary Gold: 2.2% of London
Bullion Market Association Price
chargeable on the contained Gold
metal in ore produced.
By product Gold : 1.65% of London
Bullion Market Association Price
chargeable on the contained Gold
metal in ore produced.
6.
Copper
4.5% of London Metal Exchange
(Copper) Price chargeable on the
contained Copper metal in ore
produced.
7.
Lead
Ore-8.5%
of
London
Metal
Exchange (Lead) Price chargeable on
the contained Lead metal in ore
produced.
Concentrated-14.5%
of
London
Metal
Exchange
(Lead)
Price
chargeable on the contained Lead
metal in the concentrate produced.
8.
Graphite
Rs. 30 Per Metric Tonne of Graphite
Dispatch (with less than of 20% fixed
carbon).
Rs. 80 Per Metric Tonne of Graphite
Dispatch (with 20% or more fixed
carbon but less than 40% fixed
carbon).
Rs. 170 Per Metric Tonne of
Graphite Dispatch (with 40% or
more fixed carbon but less than 80%
fixed carbon).
Rs. 250 Per Metric Tonne of
Graphite Dispatch (with more than of
80% fixed carbon).
9.
Kyanite
Rs. 250 Per Metric Tonne of Kyanite
Dispatch
10.
Uranium
1%
of
Annual
Compensation
Amount received by UCIL.
11.
Any other mineral bearing land
In case of any other mineral, once
excavation starts in the State, then
Rate of Cess shall be equal to the
rates of royalty as prescribed in
Second Schedule of Mines and
Minerals
(Regulation
and
Development)
Act,
1957)
as
amended).