GOVERNMENT OF KARNATAKA

NO:UDD 75 GEL 2021(e) KARNATAKA GOVERNMENT SECRETARIAT

VIKASA SOUDHA,

BENGALURU, DATED: 12/01/2022

NOTIFICATION

Whereas the draft of the Karnataka Telecommunication Infrastructure

and Underground Optical Fibre Cable Bye-laws, 2021 in exercise of the

powers conferred by the Indian Telegraph Right of Way Rules, 2016 read

with sections 318 and 321 of the Bruhat Bengaluru Mahanagara Palike Act,

2020 (Karnataka Act 53 of 2020), sections 423 and 427 of the Karnataka

Municipal Corporations Act, 1976 (Karnataka Act 14 of 1977) and section

325 of the Karnataka Municipalities Act, 1964 (Karnataka Act 22 of 1964)

and in order to bring uniformity in disposal of permission amount in Local

Authorities has been published in the State Gazette in vide notification

No.UDD 75 GEL 2021(e), dated 23.06.2021 in part III of the Karnataka

Extraordinary Gazette inviting objections and suggestions from all persons

likely to be affected thereby within thirty days from the date of its publication

in Official Gazette.

And whereas the said Gazette was made available to public on 23rd

June 2021 and whereas the objections and suggestions received are

considered by the state Government.

Now therefore in exercise of powers conferred under the Indian

Telegraph Right of Way Rules, 2016 read with sections 318 and 321 of the

Bruhat Bengaluru Mahanagara Palike Act, 2020 (Karnataka Act 53 of 2020),

sections 423 and 427 of the Karnataka Municipal Corporations Act, 1976

(Karnataka Act 14 of 1977) and section 325 of the Karnataka Municipalities

Act, 1964 (Karnataka Act 22 of 1964) the State Government notifies the

following Rules/bye-laws, namely

¨sÁUÀ – 3

Part – III

, 12

, 2022 (

, 22,

, ೧೯೪3)

BENGALURU, WEDNESDAY, 12, JANUARY , 2022 ( PUSHYA , 22, SHAKAVARSHA, 1943)

. 45

No. 45

2

DRAFT BYE-LAWS

CHAPTER-I

PRELIMINARY

1. Title, commencement and application. - (1) These Bye-laws may

be called the Bruhat Bengaluru Mahanagara Palike and Karnataka

Municipal

Corporations

Telecommunication

Infrastructure

and

Underground Optical Fibre Cable Rules/Bye-laws, 2021 and the

Karnataka Municipalities Telecommunication Infrastructure and

Underground Optical Fibre Cable Rules/Bye-laws 2021.

(2) They shall come into force from the date of their final publication in

the official Gazette.

(3) Notwithstanding anything contained in the zoning regulation

contained in any master plan, the provisions of these Rules/Bye-laws

shall apply to the areas of,-

i.

The Bruhat Bengaluru Mahanagara Palike;

ii.

The City Corporations;

iii.

The City Municipal Councils;

iv.

The Town Municipal Councils; and

v.

The Town Panchayats.

2. Definitions. – For the purposes of Bye-laws, unless the context

otherwise requires,-

(a) “Act” means the Indian Telegraph Act, 1885 (Central Act 13 of

1885);

(b) “Applicant” shall mean an agency who is a telecom or cable

infrastructure provider, registered with the Department of

Telecommunication

to

install

new

Telecommunication

Infrastructure Towers (TIT) or to lay cable wires either below the

surface of the earth or above the surface of the earth for any

communication purposes recognized under the appropriate law.

(c) “Appropriate Authority” means the authority as defined under

clause (b) of rule 2 of the Indian Telegraph Right of Way Rules,

2016;

(d) “Cable” shall mean an assembly of one or more insulated

conductors or optical fibres or a combination of both within an

enveloping jacket which may be above the surface of the Earth or

below the surface of the Earth and shall be a high-speed physical

medium for transmitting data or information and shall not include

those cables utilized for broadcasting or provision of programming

3

services under the Cable Television Networks Regulations Act,

1995 (Central Act 7 of 1995)

(e) “Cable duct” shall mean a pipe or tubular hollow structure

designed to accommodate the running of one or more cables

within it.

(f) “Government” means the Government of Karnataka.

(g) “Nodal Officer” for the purpose of these Bye-Laws means,-

i.

the Chief Commissioner or officer authorized by him in case of the

Bruhat Bengaluru Mahanagara Palike;

ii.

the Commissioner or officer authorized by him in case of the City

Corporation;

iii.

the Municipal Commissioner or officer authorized by him in case of

the City Municipal Council; and

iv.

the Chief Officer in case of the Town Municipal Council and Town

Panchayat.

(h)“Permission holder” means any person holding a permission/

licence issued under these Bye-laws;

(i) “Overground cable infrastructure” means a cable over the

ground and includes posts or other above ground contrivances

appliances and apparatus for the purpose of establishment or

maintenance of the cable;

(j) “Permission” means the permission granted by the urban local

bodies

to

an

applicant

for

the

purpose

of

installing

telecommunication infrastructure tower or laying down optical

fibre cables above the surface of the earth or below the surface of

the earth in accordance with these Rules / Bye-laws;

(k) “Schedule” means the schedule appended to these Rules/Bye-

laws;

(l) "Telecommunication Infrastructure Tower (TIT)" shall include

Ground Based Tower (GBT), Roof Top Tower (RTT), Roof Top Poles

(RTP), Cell Phone Tower (CPT), Antenna fixtures, fabricated

antenna, Tower to install the telephone lines, Transmission

Towers, Cell On Wheels, In-Building Solutions and Micro Sites.

But it shall not include the Antennas installed for domestic

purpose, namely Television Antennas or Dish Antennas;

4

(m) “Underground cable infrastructure” includes manholes,

marker stones, appliances and apparatus for the purposes of

establishment or maintenance of the cables; and

(n) “Urban Areas” means areas with in the limits of Urban Local

Bodies.

CHAPTER-II

SURVEY

3. Survey of the existing cables below the surface of the earth and

above the surface of the earth.-

(1) In urban areas where prior to the notification of these

Rules/Bye-laws there existed no procedure for laying of optical fibre

cables or the existing procedure was insufficient, the nodal officer shall

undertake a survey within thirty days from the date of notification of

these Rules/Bye-laws.

(2) The survey shall identify areas where cables or cable ducts

have been laid below and above the surface of the earth and the

agencies responsible for laying such cables or cable ducts and such a

survey shall ordinarily be completed within sixty days from the date of

commencement of survey.

(3) The Nodal officer shall co-ordinate with Cable Infrastructure

providers where necessary for survey purpose.

(4) Upon undertaking the survey of cables and cable ducts laid

below and above the surface of the earth, the Nodal officer shall

identify such empty cable ducts within which new cables may be

accommodated and record such details for the purposes of

scrutinizing any application received under these Rules/Bye-laws.

(5) Based on the survey undertaken, the appropriate authority

shall direct such agencies who have laid down cables or cable ducts

prior to the notification of these rules/bye-laws to register themselves,

afresh, with the nodal officer in accordance with the procedure laid

down under these Rules/bye-laws.

4. Survey of telecommunication infrastructure towers,-

(1) In urban areas where prior to the notification of these

Rules/Bye-laws there existed no procedure for installation of

telecommunication infrastructure tower, the nodal officer shall

undertake a survey within thirty days from the date of notification of

these Rules/Bye-laws.

5

(2) The survey under (1) shall ordinarily be completed within

sixty days from the date of commencement of survey and the Nodel

Officer shall co-ordinate with telecommunication infrastructure

providers where necessary for survey purposes.

(3) The telecommunication infrastructure towers that have

previously registered with the urban local bodies or have remained

unregistered shall register themselves with the nodal officer in

accordance with the procedure laid down under these Rules/Bye-laws.

(4) Based on the survey undertaken, the nodal officer shall direct

such agencies who have installed telecommunication infrastructure

towers prior to the notification of these Bye-laws to register

themselves, afresh, with the nodal officer in accordance with the

procedure laid down under these Rules / Bye-laws. The details of the

survey undertaken by the local bodies for the installation of

telecommunication infrastructure tower and cables shall be recorded

by the local body in such manner as may be appropriate and the

particulars of the survey shall be communicated to the Government.

5. Essentiality Of Permit,- No person shall erect or re-erect any non-

Governmental telecommunication infrastructure tower or

telecommunication pole structures or accessory rooms or lay

underground cables or overground cables or make alteration or cause

the same to be done without obtaining a separate permission for each

such erection or laying from the nodal officer.

“Provided, if any person erects a telecommunication tower or lays down

cables (either underground or overground) in the absence of permission

under these Rules/Bye-Laws, the nodal officer shall initiate action, after

giving notice, for removal of the telecommunication tower or cables as

per law.

6. Establishment Of Electronic Platform,- (1) The State Government

shall establish an electronic platform within six months from the date

of publication of these Rules/Bye-laws, for the purposes of

considering the application submitted to nodal officer who shall

convey the acceptance or rejection of the application through the

electronic platform.

a. The platform may also be used for co-ordination among various

agencies for the approval and execution.

b. The Government may from time to time prescribe such standards and

procedures for the working of the online platform.

6

c. The appropriate authority shall maintain a database of the

applications received, permissions granted and the routes on which

permissions have been granted.

d. Applications shall be accepted manually by the Appropriate Authority

until the electronic platform is implemented as per these rules/bye-

laws.

CHAPTER-III

Establishment And Maintenance Of Underground Cable Infrastructure

7. Application: (1) An applicant shall, for the purposes of establishment

of cable infrastructure/ laying of cables under any immovable

property vested in or under the control or management of the

appropriate authority make an application, supported by such

documents, in accordance with Schedule A on the single window

platform to the Appropriate Authority / urban local body.

(2) The information along with supporting documents to be

provided by the applicant in the application made under sub-clause (1)

shall be as given in Schedule C.

Provided any applicant seeking permission to lay cables under

these Rules/Bye-laws may submit an affidavit to the nodal officer

declaring compliance with these Rules/Bye-laws and acknowledgement

of payment of the application fees to the Appropriate Authority / urban

local body. The Nodal officer shall permit the applicant to lay cables

provided that all the documents required are submitted within two

months from the date of submission of the affidavit.

Provided further that the applicant is exempted from fee under

these rules/bye-laws if he has paid fees to the Urban Local

Body/Appropriate Authority for establishment of cable infrastructure

or laying of cable through MoU or other instruments with the respective

Urban Local Body/ Appropriate Authority, prior to the commencement

of these rules/bye-laws.

Provided further that in case the applicant fails to submit the

documents within two months, the Nodal officer shall upon serving

notice remove the cable infrastructure and levy a penalty of two times

the application fees or the expenses incurred for removal, whichever is

higher.

(3) (i) In addition to the documents specified in Schedule C, the

permission holder shall, while making the application, give a specific

commitment on whether he undertakes to discharge the responsibility

for restoration, to the extent reasonable and prudent, of the damage

7

that the urban local body shall necessarily be put in consequence of the

work proposed to be undertaken.

(ii) If the applicant commits to undertake the responsibility of

restoration, he/ she shall submit an estimate of the cost of such

restoration which shall be approved by the Appropriate Authority. Else,

the applicant shall deposit the amount equivalent to the cost of

restoration, as specified by the Appropriate Authority / urban local

body. The applicant shall make the payment of expenses or submit the

bank guarantee as determined by the Appropriate Authority / urban

local body before the grant of permission;

(4) Every application under sub-rule (1) shall be accompanied with

fee of Rupees One Thousand per Kilometer to meet administrative

expenses for examination of the application and the proposed work as

the Appropriate Authority / urban local body may, by general order,

deem fit;

(5) All existing underground cable infrastructure shall register

within six months from the date of publication of this notification in

official gazette, by paying fees prescribed in sub clause (4) and

completion of compliances under this section.

Provided the applicant is exempted from fees under this section if

he has paid fees under existing MoU/agreement with respective Urban

Local Body/Appropriate Authority. Prior to the commencement of these

Rules/bye-laws.

(6) In the event an applicant seeks permission to lay cables below

the surface of the earth on those roads whose ownership cuts across

two or more local bodies, the applicant shall make two separate

applications in accordance with these Rules/Bye-laws.

(7) Permission and bank guarantee are necessary for operation and

maintenance activities in respect of underground cable infrastructure

that are likely to damage to public property.

8. Grant of permission by Appropriate Authority / urban local

body,- (1) The concerned nodal officer shall examine the application

with respect to the following parameter, namely.-

(i) The route planned for the proposed underground cable

infrastructure

and the

possible

interference,

either

in

the

establishment or maintenance of such cable infrastructure with any

other public infrastructure that may have been laid along the

proposed route;

8

(ii) The mode of execution;

(iii) The time duration for execution of the work and the time of

the day that the work is proposed to be executed;

(iv) The estimation of expenses that the Appropriate Authority /

urban local body shall necessarily be put in consequence of the work

proposed to be undertaken;

(v) The responsibility for restoration of any damage that the local

authority/ urban local body may necessarily be put in consequence

of the work proposed to be undertaken;

(vi) Assessment of measures to ensure public safety and

inconvenience that the public is likely to be put to in consequence of

the work proposed and the measures to mitigate such inconvenience

indicated by the permission holder; and

(vii) Any other matter, consistent with the provisions of the Act

and these Rules/Bye-laws, connected with or relative to the

establishment or maintenance of underground cable infrastructure,

through a general or special order, by the Central Government, State

Government or the Appropriate Authority / urban local body.

(2) The Appropriate Authority shall, within a period not exceeding

sixty days from the date of application made.-

(i) grant permission on such conditions including but not

limited to, the time, mode of execution, measures to

mitigate public inconvenience or enhance public safety and

payment of restoration charge as may be specified, subject

to the provisions of the Act and Rules made thereunder and

these Rules / Bye-laws; or

(ii) reject the application for reasons to be recorded in

writing;

Provided that no application shall be rejected unless the applicant

has been given an opportunity of being heard on the reasons for such

rejection;

Provided further that the permission shall be deemed to have been

granted if the Appropriate Authority fails to either grant permission

under (i) or reject the application under (ii); and the same shall be

communicated in writing to the applicant not later than five working

days after the period specified above.

(3) Where the Appropriate Authority accepts the undertaking by

the applicant to discharge the responsibility to restore the damage that

such authority shall necessarily be put in consequence of the work, the

Appropriate Authority while granting permission under clause (i) of sub-

9

clause (2) shall seek a bank guarantee for an amount in lieu of expenses

for restoration of such damage, as security for performance in the

discharge of the responsibility.

(4) Upon the grant of permission, the Nodal officer shall within

fifteen days from the date of grant of such permission publish the order

granting permission, the route where the cables has been permitted to

be laid and any other information on the website of the respective urban

local body.

(5) The Appropriate Authority shall not charge any fee other that

those prescribed above from the permission holder for establishment of

underground cable infrastructure.

9. Duration of permission,- (1) It shall be contingent on the extent of

land or road sought to be dug but shall not exceed nine months from

the date of grant of permission.

(2) If the applicant is unable to lay down cables within the

duration determined by the concerned appropriate authority under

sub-clause (i), he/ she shall be required to make an application for

renewal on the single window platform and shall specify the reasons for

non-completion of works under the previous permission.

(3) No permission for renewal shall be granted by the concerned

urban local body for a period exceeding three months and an

application for renewal shall be accompanied by the fee.

Provided that the applicant may be granted renewal for an

additional period of three months if laying of cables was delayed due to

force majeure events.

10. Obligations of permission holder in undertaking work.- (1) The

permission holder shall ensure that –

(a) prior to the commencement of work of laying the underground

cable infrastructure and at all times during the execution of work,

the measures to mitigate public inconvenience and provide for

public safety are implemented,; and

(b) the work of laying underground cable infrastructure is carried

out in accordance with the conditions specified in the grant of

permission by the appropriate authority.

(2) The permission holder shall ensure provision of positional

intelligence, through appropriate technology, of all underground cable

infrastructures to enable the Appropriate Authority to obtain real time

information on its location.

10

(3) The permission holder shall comply with the technical guidelines

provided for under “Schedule-D”

11. Powers of Appropriate Authority to supervise the work.- (1) The

appropriate authority may supervise the execution of work to

ascertain if the conditions imposed in the grant of permission are

observed by the permission holder.

(2) The concerned appropriate authority may, on the basis of such

supervision, impose such other reasonable conditions as it may think

fit.

(3) If the concerned appropriate authority comes to the conclusion that

the permission holder has willfully violated any of the conditions for

grant of permission, it may forfeit, in full or in part, the bank guarantee

submitted by the permission holder and withdraw the permission

granted to the permission holder, for reasons to be recorded in writing;

Provided that no action shall be taken under this sub-rule unless

the permission holder has been given an opportunity of being heard.

12. Maintenance of Cables,- (1) The permission holder shall not remove

or translocate the cables without the prior approval of the concerned

local authority.

(2) In the event the Local Authority/ Urban Local Body or any

other agency of the State Government or Central Government seeks to

widen or modify the roads below which the cables of the permission

holder exist, such permission holder shall coordinate with such agency

for removal or shifting of the cable ducts.

(3) The permission holder shall be notified by Appropriate

Authority / Urban Local Body or any other agency of the State

Government or Central Government, 30 days prior, if any coordination

is required to reposition the under-ground assets to accommodate the

requirements of government projects and developmental works.

(4) In the event the cable ducts laid down by the permission holder

is required to be removed for the purposes provided for under sub-

clause (ii), he shall apply for permission, afresh under these Rules/Bye-

laws for laying cables in another location but shall be exempted from

payment of fees or furnishing bank guarantee.

13. Penalties,- (1) The permission holder shall be responsible for

restoration of any damages caused to any public or private property

11

during the course of laying cables. In addition, the nodal officer may

levy penalty of Rupees One Lakh for causing such damage.

(2) In case of any untoward incidences or accidents arising due to

negligence on the part of permission holder during laying of

underground cable infrastructure, the nodal officer shall initiate

criminal proceedings against the permission holder and take necessary

action as per law, in addition to levy of penalty.

CHAPTER-IV

ESTABLISHMENT OF OVERGROUND TELECOMMUNICATION

INFRASTRUCTURE TOWER OR OVERGROUND CABLE

INFRASTRUCTURE

14. Application:- (1) An applicant shall, for the purposes of establishing

overground telecommunication infrastructure tower or overground

cable infrastructure, upon any immoveable property vested in or

under the control or management of any appropriate authority, make

an application, supported by such documents, to that appropriate

authority in such form and manner as may be specified by the said

authority.

(2) The information along with supporting documents to be provided

by the applicant in the application made under sub-rule (1) shall be as

per Schedule E & Schedule C, as the case maybe.

Provided

any

applicant

seeking

permission

to

erect

telecommunication

infrastructure

tower

or

overground

cable

infrastructure under these Rules/Bye-laws may submit an affidavit to

the concerned appropriate authority declaring compliance with these

Rules/Bye-laws and acknowledgement of payment of the application

fees to the concerned appropriate authority. The concerned appropriate

authority shall permit the applicant to erect the telecommunication

infrastructure tower or overground cable infrastructure provided that

all the documents required are submitted within two months from the

date of submission of the affidavit.

Provided further that in case the applicant fails to submit the

documents within two months the concerned appropriate authority

shall upon serving notice remove the tower/ cable and levy a penalty of

two times the application fees.

(3) (i) In addition to the documents specified in Schedule C, the

permission holder shall, while making the application, give a specific

commitment on whether he undertakes to discharge the responsibility

12

for restoration, to the extent reasonable and prudent, of the damage

that the concerned appropriate authority shall necessarily be put in

consequence of the work proposed to be undertaken.

(ii) If the applicant commits to undertake the responsibility of

restoration, he shall submit an estimate of the cost of such restoration

which shall be approved by the authority. Else, the applicant shall

deposit the amount equivalent to the cost of restoration, as specified by

the authority.

(4) Every application under sub-rule (1) shall be accompanied with

a fee of Rupees Ten Thousand to meet the administrative expenses for

examination of the application and the proposed work as the

appropriate authority may, by general order, deem fit:

(5) All existing telecommunication infrastructure towers or

overground cable infrastructure shall register within six months from

the date of publication of this notification in official gazette, by paying

fees prescribed in sub-clause (4) above and by submitting structural

safety/ stability certificate from a structural engineer empanelled with

the local authority or any other agency of the State or Central

Government. Upon the failure of the existing telecommunication

infrastructure tower or overground cable infrastructure provider to pay

the fees and register within the stipulated time, the concerned local

authority shall initiate action, after giving notice, for removal of the

telecommunication

infrastructure

tower

or

overground

cable

infrastructure as per law.

(6) Operation & Maintenance activities in respect of overgorund

telecommunication

infrastructure

tower

or

overground

cable

infrastructure shall be undertaken with prior intimation to nidel

officer. No fresh permissions are necessary for purely operation &

maintenance activities.

Provided that any activities that causes change in location of

overground telecommunication infrastructure tower or overground

cable infrastructure will necessitate permission under rules/bye –laws.

15. Grant of permission by the Appropriate Authority.- (1) The

appropriate authority shall examine the application with respect to

the following parameters, namely:-

i.

the extent of land required for the telecommunication infrastructure

tower or overground cable infrastructure;

ii.

the location proposed;

13

iii.

the approval issued by the duly authorized officer of the Central

Government for location of the above ground contrivances proposed

to be used for transmission of Radio waves or Hertzian waves;

iv.

the mode of and time duration for execution of the work;

v.

the estimation of expenses that the appropriate authority shall

necessarily be put in consequence of the work proposed to be

undertaken;

vi.

assessment of the inconvenience that the public is likely to be put to

in consequence of the establishment or maintenance of the

telecommunication infrastructure tower or overground cable

infrastructure, and the measures to mitigate such inconvenience

indicated by the permission holder

vii.

certification of the technical design by a structural engineer attesting

to the structural safety of the telecommunication infrastructure tower

or overground cable infrastructure;

viii.

Certification by a structural engineer, of the structural safety of the

building, on which the post or other above ground contrivances is

proposed to be established; Aerial cables which are permitted only for

last mile connectivity, do not require structure certificates for

installation.

ix.

any other matter, consistent with the provision of these Rules/Bye-

laws, connected with or related to the laying of telecommunication

infrastructure tower or overground cable infrastructure, through a

general or special order or guidelines by the Central Government,

State Government or the concerned local authority;

(2) Where the establishment of the overground telecom/ cable

infrastructure is over the immoveable property, vested in the control or

management of any local authority which is, unlikely to be used for any

other purpose, the local authority shall be entitled to compensation for

the value of the immoveable property, either once or annually, assessed

on such rates as that appropriate authority may, by general order,

specify.

(3) The appropriate authority shall within a period not exceeding

sixty days from the date of application -

(a) grant permission on such conditions including, but not

limited to, the time, mode of execution, measures to mitigate

public inconvenience or enhance public safety or structural

safety and payment of restoration charge or compensation,

subject to the provisions of the Act and these Ruls/Bye-

laws; or

(b) reject the application for reasons to be recorded in

writing:

14

Provided that no application shall be rejected unless the

applicant has been given an opportunity of being heard on the reasons

for such rejection:

Provided further that the permission shall be deemed to have

been granted if the concerned appropriate authority fails to either grant

permission under clause (a) or reject the application under clause (b)

and the same shall be communicated in writing to the applicant not

later than five working days after the time specified as above.

(4) Where the concerned appropriate authority accepts the

undertaking by the permission holder to discharge the responsibility to

restore the damage that such authority shall necessarily be put in

consequence of the work, the concerned appropriate authority while

granting permission shall seek a bank guarantee for an amount in lieu

of expenses for restoration of such damage, as security for performance

in the discharge of the responsibility.

(5) Formal clearance or permit will not be requires for installation of

cell on wheels, The Cell on Wheel can maximum placed for 90 day with

prior intimation to nodal officer, along with fees. Where the deployment

is more than 90 days due to any reason, permission from concerned

local authority is required for a period not exceeding 180 days.

(6) For cell on Wheels, Micro sites and in-building solutions, the fees

to be paid shall be Rupees Two Thousand.

(7) The concerned appropriate authority shall not charge any fee

other than those mentioned under sub-clause (b) above from the

permission holder for establishing overground telecom/ cable

infrastructure.

(8) The permit issued shall be a work permit and the construction

or erection of telecommunication tower or telecommunication pole

structures or accessory rooms essential for the use of such tower or

pole structures shall be completed within two years from the date of

issue of such permit.

(9) The period of the permit shall be extended for a further period of

two years if an application for the same is submitted to the concerned

appropriate authority, within the valid period of the permit duly paying

25% of the prescribed fee and charges and in the prescribed form duly

attaching the original permit.

15

16. Obligations of permission holder in undertaking work.- The

permission holder shall ensure that –

(1) Prior to the commencement of establishment and maintenance

of telecommunication infrastructure tower or overground cable

infrastructure and at all times, the measures to mitigate public

inconvenience and ensure public safety, including structural safety of

such telecommunication infrastructure tower or overground cable

infrastructure are implemented;

(2) The work of establishment and maintenance of overground

telecom/ cable infrastructure is carried out in accordance with the

conditions specified in the grant of permission by the appropriate

authority.

17. Powers of the Appropriate Authority to supervise the work.-

(1)

The

concerned

appropriate

authority

may

supervise

the

establishment and maintenance of telecommunication infrastructure

tower or overground cable infrastructure to ascertain if the conditions

imposed in the grant of permission are observed by the permission

holder.

(2) The concerned appropriate authority may, on the basis of such

supervision, impose such other reasonable conditions, as it may think

fit.

(3) If the concerned appropriate authority comes to the conclusion that

the permission holder has willfully violated any of the conditions for

grant of permission, it may withdraw, for reasons to be recorded in

writing, the permission granted to the permission holder:

Provided no action shall be taken under sub-rule unless the

permission holder has been given notice, and an opportunity of being

heard. The permission holder shall be given a period of 30 days to

remedy violations identified by the Authority.

18. Maintenance of telecommunication infrastructure tower or

overground cable infrastructure,- (1) The permission holder shall

not remove or translocate the telecommunication infrastructure tower

or overground cable infrastructure without the prior approval of the

concerned appropriate authority.

(2) In the event the Local Authority/ Urban Local Body or any other

agency of the State Government or Central Government seeks to widen

or

modify

the

roads

abutting

which

the

telecommunication

infrastructure tower or overground cable infrastructure of the

permission holder exists, such permission holder shall coordinate with

16

such agency for removal or shifting of the telecommunication

infrastructure tower or overground cable infrastructure.

(3) In the event the telecommunication infrastructure tower or

overground cable infrastructure laid down by the permission holder is

required to be removed for the purposes provided for under sub-clause

(ii), he shall apply for permission, afresh under these Bye-laws for laying

it in another location but shall be exempted from payment of fees or

furnishing bank guarantee.

19. Penalties,- (1) The permission holder shall be responsible for

restoration of any damages caused to any public or private property

during the course of erection of telecommunication infrastructure

tower or overground cable infrastructure. In addition, the nodal

officer may levy penalty of Rupees One Lakh for such damages

caused.

(2) In case of any untoward incidences or accidents arising due to

negligence on the part of permission holder during erection of

telecommunication

infrastructure

tower

or

overground

cable

infrastructure or due to failure in structural stability of the building on

which the telecommunication infrastructure tower is erected, the nodal

officer shall initiate criminal proceedings against the permission holder

and take necessary action as per law, in addition to levy of penalty.

(3) The nodal officer shall grant permission for establishing

overground Telecommunication Infrastructure Tower shall mandatorily

obtain structural safety certificate as stipulated in clause 14 (viii). If

permission is granted without the above mentioned certificate, criminal

proceedings against the concerned nodal officer shall be initiated along

with disciplinary action as per law.

20. Restriction to erect Telecommunication Infrastructure Towers.-

(1) Water Bodies: (i) No Telecommunication Infrastructure Tower

shall be allowed in the bed of water bodies like river or nala and in

the Full Tank Level (FTL) of any lake, pond, kunta lands. Unless and

otherwise stated, the area and the Full Tank Level (FTL) of a Lake or

Kunta shall be reckoned as measured and as certified by the

Revenue/ Minor Irrigation/ Water Resources Department.

(ii) The buffer to be maintained from various water bodies including

rivers, takns, Kuntas, Canals, Nalas, Storm Water Drains, for

installation of Telecommunication Infrastructure Tower shall be as

prescribed by Government form time to time.

17

(2) Railways: The distance between the Railway Property Boundary

and the Telecommunication Infrastructure Tower shall be 30m as per

Indian Railways Works Manual or as per no objection certificate given

by the Railway Authorities.

(3) Electrical Lines: The right-of-way widths recommended for

electrical lines of various transmission voltage are as indicated in the

table below:

i.

Right-of -way (ROW) for Electrical lines. -

Sl_No.

Transmission voltage

Width of the Right-of-way

(ROW) in meters

01

11 kV

,_

7.0

02

33 kV

15.0

03

66 kV

,

18.0

04

110 kV

22.0

05

132 kV

27.0

06

220 kV

35.0

07

400 kV

52.0

(ii) Distance of site from Electric Lines. - No Telecommunication

Infrastructure Tower shall be allowed to be erected or re-erected or

any

additions

or

alterations

made

to

Telecommunication

Infrastructure Tower in a site within the distance quoted below in

accordance with the current Electricity Rules and its amendments

from time to time between the building and any overhead electric

supply line;

Vertically in m.

Horizontally in m.

i

Low and medium voltage

lines and service lines

2.5

1.2

ii

High voltage lines upto

and including 33,000 V.

3.7

2.0

18

iii

Extra high voltage lines

beyond 33000 V.

3.7 (plus 0.3m for

every

additional

33,000 V. or part

thereof )

2.0 (plus 0.3m for

every

additional

13,000 V. or part

thereof )

(4) In the reserved forest or forest areas: for erecting the Towers,

NOC from the Forest Department shall be submitted.

(5) Heritage, Religious and Other Structures: (i) In case of Sites

located within the distance up to 100meters from protected monuments

as notified under the Ancient Monuments and Archeological sites and

Remains Act 1958 (central Act 24 of 1958) or the Karnataka Ancient

and Historical Monuments and Archeological sites and Remains Act,

1961 (Karnataka Act 7 of 1962) no building or Telecommunication

Infrastructure Tower is allowed;

(ii) For the Sites located within distance of above 100meters and up to

200meters from the protected monuments, the construction of one

Telecommunication Infrastructure Tower is allowed only after obtaining

prior permission from the concerned appropriate authority.

Provided that, the above clause shall not be applicable to towers which

have been erected by any person or entity prior to notification of these

Rules/Bye-Laws.

Provide further that CoW/micro sites/IBS/Boosters etc may allowed

with prior intimation to the nodal officer.

(iii) In case of Wall Mounted or Pole mounted Antenna, the antenna

shall be mounted at least 5 meters above ground level or road level on

flyovers.

CHAPTER-V

RIGHT OF APPROPRIATE AUTHORITY TO SEEK REMOVAL OF

UNDERGROUND CABLE INFRASTRUCTURE OR OVERGROUND

TELECOMMUNICATION INFRASTRUCTURE TOWER OR OVERGROUND

CABLE INFRASTRUCTURE

21. Right of the appropriate authority to seek removal, etc-

(1) Where the concerned appropriate authority, having regard to

circumstances which have arisen since the establishment of any

telecom

infrastructure

or

underground

or

overground

cable

infrastructure under, over, along, across, in or upon, any immoveable

property vested in or under the control or management of that

authority, considers that it is necessary and expedient to remove or

alter

such

underground

cable

infrastructure

or

overground

19

telecommunication

infrastructure

tower

or

overground

cable

infrastructure, it shall issue a notice to the permission holder, being

the owner of such telecom/ cable infrastructure, to remove or alter its

location.

(2) On receipt of the notice under sub-rule (1), the permission holder

shall, forthwith and within a period of thirty days, proceed to submit,

to the concerned appropriate authority, a detailed plan for removal or

alteration of such infrastructure.

(3) The concerned appropriate authority shall, after examination of

the detailed plan submitted by the permission holder under sub-clause

(2), pass such orders as it deems fit:

Provided that the concerned appropriate authority shall, having

regard to emergent and expedient circumstances requiring the removal

or alteration of such telecom/ cable infrastructure, give a reasonable

time of not less than ninety days to the permission holder for removal

or alteration of such infrastructure;

Provided further that the responsibility and liability, including the

cost thereof, for removal or alteration of such underground/ over

ground telecom infrastructure shall be borne by the permission holder.

By Order in the name of

The Governor of Karnataka,

(Latha k)

Under secretary to Government i/c,

Urben Development Department

(MA-2 and Board)

20

[SCHEDULE A]

APPLICATION FORM

Ref No:

Dated:

To,

_______________

_______________

Subject: Application for permission for laying of cables under

_____________ Bye-laws

Name of the Applicant/ Company:

Address:

Contact Number:

Email Address:

I (Name of the designated member in the company for carrying out

the purposes of this rule) _______________________________ of

_________________________________

(Name

of

the

company

if

applicable), the undersigned, apply for permission to lay down cables

below the surface of the earth at ___________(Please mention specific

location or locations). I have attached documents required under

“Schedule C” and submit this application in accordance with other

provisions of_______________ Bye-laws. I have paid the requisite fees

and attached the acknowledgement of such payment to this

application. I have furnished the security deposit in a manner

prescribed by the appropriate authority.

Signature of the Applicant

21

[SCHEDULE B]

PERMISSION FORM

Ref

No: Dated:

I, _____________, [Appropriate Authority] designated under the

…………. bye-laws hereby grant you permission to lay cables as per

your application vide____________, dated ____________.

You shall abide by the following conditions,

A. You shall complete laying of cables within _____

B. You shall restore the roads dug by you within _________

C. You shall comply with all the provisions of ____________ Bye-Laws /

_______

D. Any other conditions as may be determined by the Nodal officer.

Signature of the Appropriate Authority

_______________________

REJECTION FORM

Ref No: Dated:

I, _________________ [Appropriate Authority] designated under these

……. Rules/ Bye-laws, hereby reject your application for permission

to lay cables as per your application vide ______dated ____________.

You may resubmit your application for the reconsideration of the

Nodal officer.

Signature of the Appropriate Authority

_____________________________________

22

[SCHEDULE C]

List of Documents required along with the application:

1. Documents to be submitted in all cases

(i) Copy of registration certificate as communication infrastructure

provider or a telecom service provider granted by the Department

of Telecommunications, Government of India;

(ii) Two sets of proposed route for the laying of the cables

(iii) Time schedule (stretch and stage-wise) for completion of work

and investment.

2. Documents for laying cables below the surface of the earth (in

addition to those under serial number 1 above),

(i) Technology or method proposed to be used for laying the cables

(Horizontal Directional Drilling/ Horizontal Boring methods or

Micro Trenching or open digging) with preference for use of

Horizontal Directional Drilling or Micro Trenching;

(ii) Details of the proposed area such as the manholes that exist

and other such existing inlets to the surface below the road.

(iii)Dimensions of the road where such cables are proposed to be

laid

(iv) Estimate of the cost for restoration of the damage that the nodal

officer shall necessarily be put in consequence of the work

proposed to be undertaken

23

[SCHEDULE D]

Technical Standards and parameters

1. Technical Parameters to be followed by the infrastructure service

providers while laying the cables below the surface of the earth.

Laying down of underground cables

a. The applicant shall carry out the work by using Horizontal Directional

Drilling method only so as to minimize the damage and to cause

minimum inconvenience to the public.

b. The cable shall ordinarily be laid below the footpath or berm or the

shoulder of the road.

c. The top of the casing or conduit pipe containing the cables shall be at

least 1.6 meter below the top surface subject to at least 0.3 meter

below the drains inverts and other utility supplies.

d. Pits of 2 meter x 1 meter and 1.5 meter deep, or of lower size shall be

made at a convenient distance but not less than 80 meter, centre-to-

centre, for laying cables. However, in case of special site condition

variable depth or dimensions may be permitted by the Nodal officer

depending on the site conditions

e. The name of the permission holder shall be indicated on the cables

boldly.

SCHEDULE - E

LIST OF DOCUMENTS TO BE SUBMITTED FOR ERECTION OF

TELECOMMUNICATION TOWER

(i) a copy of the license granted by the Central Government;

(ii) the nature and location, including exact latitude and

longitude, of post or other above ground contrivances proposed

to be established;

(iii) the extent of land required for establishment of the

overground telecom/ cable infrastructure;

(iv) the details of the building or structure, where the

establishment of the overground telecom/ cable infrastructure,

is proposed;

(v) the copy of approval issued by the duly authorized officer of

the Central Government for location of the above ground

contrivances proposed to be used for the transmission of Radio

waves or Hertzian waves;

(vi) the mode of and the time duration for, execution of the work;

(vii) the inconvenience, that is likely to be caused to the public

and the specific measures proposed to be taken to mitigate such

inconvenience;

24

(viii) the measures proposed to be taken to ensure public safety

during the execution of the work;

(ix) the detailed technical design and drawings of the post or

other above ground contrivances;

(x) certification of the technical design by a structural engineer

attesting to the structural safety, of the overground telecom

infrastructure;

(xi) certification by a structural engineer, attesting to the

structural safety of the building, where the post or other above

ground contrivances is proposed to be established on a building;

(xii) Estimate of the cost for restoration of the damage that the

nodal officer shall necessarily be put in consequence of the work

proposed to be undertaken

(xiii) any other matter relevant, in the opinion of the applicant

connected with or relative to the work proposed to be

undertaken; and

(xiv) any other matter connected with or relevant to the work as

may be specified, through a general or special order, by the

Central Government or State Government or the nodal officer.

SCHEDULE - F

COMPLETION CERTIFICATE BY ARCHITECT, ENGINEER etc.

Certified that the erection of telecommunication tower or pole

structure or work has been supervised by me and has been completed

as per the approved plan and permit no. ……….. dated …………

Name and address of Architect/ Engineer /Town Planner Reg No.:

(Signature)

Place:

Date:

COMPLETION CERTIFICATE BY THE OWNER

Certified that the erection of telecommunication tower or pole

structure has been completed or partially completed as per the permit

no. ………… dated ………..

(Signature)

Name and address of owner:

Place:

Date:

25

SCHEDULE-G

USE CERTIFICATE

Certified that the erection of telecommunication tower or pole

structure or work under the permit no. …… dated ……… issued to

and supervised by ……. has been inspected by me and that the

work executed is in accordance with the permit and that the tower or

pole structure is now fit for use.

Signature of the Appropriate Authority

_____________________________________

By Order in the name of

The Governor of Karnataka,

(Latha K)

Under secretary to Government i/c,

Urban Development Department

(MA-2 and Board)

ಮುದÎಕರು ²ಾಗೂ ಪΐಾಶಕರು:- ಸಂಕಲ£ಾĩಾĸಗಳ…, ಕ£ಾಟಕ ªಾಜÍಪತÎ, ಸಾĸ ೇಂದÎ ಮುದΞಾಲಯ, ¦ೆಂಗಳˆರು

R.N.I. No. KARBIL/2001/47147 POSTAL REGN. No. RNP/KA/BGS/2202/2017-19

Licensed to post without prepayment WPP No. 297

SUNIL GARDE

Digitally signed by SUNIL GARDE

Date: 2022.01.13 13:30:33 +05'30'