(1)

ϝೇಷ ªಾಜÍ ಪĦΐೆ

GOVERNMENT OF KARNATAKA

No: FEE 43 EPC 2022 Karnataka Government Secretariat

M.S. Building

Bangalore, dated:12.03.2024 .

CORRIGENDUM NOTIFICATION

In the Government Notification No. FEE 316 EPC 2015, dated:19.01.2016 , the Table-

2 shall be substituted and read as follows:

Table - 2

Activities that need to install Sewerage Treatment Plants (STP) compulsorily and

ensure reuse of treated water

S.l.

No.

In sewered area where sewer line &

STP of local bodies existing

In unsewered area where sewer line &

STP of local bodies not existing

1.

All the residential Group Housing

Projects / Apartments with 120 Units

and above or generating sewage of 80

KLD and above shall install STP

All the residential Group Housing

Projects / Apartments with 20 Units and

above or having a total built up area of

2,000 square meter including basement

shall install STP

2.

Commercial

constructions

Projects

(Commercials Complexes, office, IT

related activities etc) with total built

up area of 5,000 Square meter and

above or generating sewage of 35 KLD

or above shall install STP.

Commercial

constructions

Projects

(Commercials Complexes, office, IT

related activities etc) with total built up

area of 2,000 Square meter and above

shall install STP.

3.

Educational

Institutions

with

or

without Hostel facility having total

built up area of 5,000 Square meter and

above or generating sewage of 35 KLD

or above shall install STP.

Educational Institutions with or without

Hostel facility having total built up area

of 5,000 Square meter and above shall

install STP.

¨sÁUÀ – 1

Part – I

13

2024(

, 23

1945)

BENGALURU, WEDNESDAY, 13, MARCH, 2024(PHALGUNA, 23, SHAKAVARSHA, 1945)

. 183

No. 183

2

4.

Townships and Area Development

Projects with an area of 10 acres and

above shall install STP.

Townships

and

Area

Development

Projects with an area of 10 acres and

above shall install STP.

NOTE:- Residential / Commercial Complexes / Educational Institutions / Townships /

Area Development Projects which have already installed Sewage Treatment Plant Units

prior to this Government Notification may continue to operate / Manage the Sewage

Treatment Plant Units as per the Parameters Prescribed by Karnataka State Pollution

Control Board and shall reuse / recycle or may discharge the sewage into the drainage

system after obtaining the prior permission from the Bangalore Water Supply and Sewage

Board and with intimation to the Karnataka Pollution Control Board in writing.

Rest of the contents in the aforesaid Government Notifications remain unaltered.

By order and in the name of the

Governor of Karnataka,

(B.N Praveen)

Under Secretary to Government,

(Ecology and Environment)

Forest, Ecology and Environment Department

ಮುದÎಕರು ²ಾಗೂ ಪΐಾಶಕರು:- ಸಂಕಲ£ಾĩಾĸಗಳ…, ಕ£ಾಟಕ ªಾಜÍಪತÎ, ಸಾĸ ೇಂದÎ ಮುದΞಾಲಯ, ¦ೆಂಗಳˆರು

R.N.I. No. KARBIL/2001/47147 POSTAL REGN. No. RNP/KA/BGS/2202/2017-19

Licensed to post without prepayment WPP No. 297

THAMMAIAH

Digitally signed by THAMMAIAH

DN: c=IN, st=Karnataka, 2.5.4.20=be54f34f4e31eae50203ca7fab5ceb3794f20a8460a2582ef28294d43b8f8b16, postalCode=560059,

street=BANGALORE, pseudonym=ca58c76cf7e2445d7a4f3f51407e025e,

serialNumber=4d9b284dcc53d39f1425f50485de07dd86efa302a3fce3729eddea0c1b5098e0, ou=GOVERNMENT OF KARNATAKA, o=GOVERNMENT OF

KARNATAKA, cn=THAMMAIAH

Date: 2024.03.14 18:12:09 +05'30'