(1)

ϝೇಷ ªಾಜÍ ಪĦΐೆ

MANGALURU CITY CORPORATION

NOTIFICATION

(No: NaAE 54 MMC 2023(E) Bengaluru date: 05-02-2025)

In exercise of powers conferred under section 295 and 423 of The Karnataka Municipal Corporation

Act 1976, The Mangaluru City Corporation makes the draft Building bye-laws and same was sent to

government for approval. The Government of Karnataka in exercise of powers conferred under a

section 425 of KMC act 1976 has approved the Mangaluru City Corporation Building bye-laws 2025

(Draft) vide Notification No: NaAE 54 MMC 2023(E) Bengaluru date: 05-02-2025

Further, the draft building bye-laws have been published in the state gazette and local

newspapers and a copy of the same is kept at the Corporation Office for public inspection for a

period of 30 days under section 426 of KMC act 1976 and all persons are permitted to peruse the

same during the office hours free of charge. And printed copies of the draft building bye-laws are

available on payment of 600/- rupees to Corporation Office. The draft Building bye-laws is also

available in website www.mangalurucity.mrc.gov.in .

( Ravichandra Naik, K.A.S )

Commissioner

Mangaluru City Corporation

¨sÁUÀ – 6 J

Part –VI A

14

2025

23

1946)

MYSURU, FRIDAY, 14, MARCH, 2025

PHALGUNA , 23, SHAKAVARSHA, 1946)

. 01

No. 01

2

DRAFT MANGALURU CITY CORPORATION BUILDING BYE-LAWS 2025

CHAPTER-1

1.

Title, commencement and application-

(1) These Byelaws may be called the Mangaluru City Corporation Building Bye-laws 2025

(2) They shall come into force three months after final publication in the official Gazette.

(3) All mandatory Master Plan or Zonal Regulations regarding use, land use, coverage, FAR, setback or

open space, height, number of stories, number of dwelling units, parking standards etc. for various

categories of buildings including modification therein made from time to time shall be applicable mutatis

mutandis in these Byelaws under this clause. All amendments or modifications made in the aforesaid

regulations shall automatically stand deemed to have been included as part of these Byelaws.

CHAPTER-2

2.

Definitions

1)

‘Access’ – means a clear approach to a plot or a building.

2)

‘Act’- means the Karnataka Municipal Corporations Act, 1976.

3)

‘Addition and/or Alteration’- means a structural change including an addition to the area or change

in height or the removal of part of building, or any change to the structure, such as the construction

or removal or cutting of any wall or part of a wall, partition, column, beam, joist, floor including a

mezzanine floor or other support, or a change to or closing of any required means of access ingress or

egress or a change to fixtures or equipment as provided in these Byelaws.

4)

‘Agriculture’ includes horticulture, farming, growing of crops, fruits, vegetables, flowers, grass, fodder,

trees of any kind or any kind of cultivation of soil, breeding and keeping of livestock including cattle,

horses, donkeys, mules, pigs, fish, poultry and bees, the use of land which is ancillary to the farming

of land or any purpose aforesaid but shall not include the use of any land attached to a building for

the purpose of garden to be used along with such building; and ‘agriculture’ shall be construed

accordingly.

5)

‘Air-conditioning’- The process of treating air so as to control simultaneously its temperature,

humidity, purity, distribution and air movement and pressure to meet the requirements of the

conditioned space.

6)

Amalgamation’ means clubbing of two or more building sites into one.

7)

‘Amenity’ as defined in the KUDA Act.

3

8)

‘Annexure’ means the Annexure appended to these Byelaws;

9)

‘‘Apartment’ Whether called block, chamber, dwelling unit, flat, suit, tenement, unit or by any other

name, means a separate and self-contained part of any immovable property, including one or more

rooms or enclosed spaces, located on one or more floors or any part thereof, in a building or on a plot

of land, used or intended to be used for residential purpose.

10)

Group Housing means one or more buildings, each containing more than Eight Apartments

11)

‘Appendix’ means Appendix appended to these Byelaws.

12)

‘Application’ means an application made in such form as may be prescribed herein or as notified by

the Government from time to time

13)

‘Applicant’ means any person who applies to the Local Authority with an intention to develop building

as per these Byelaws. The Applicant shall be the owner of the property or his authorised representative

or a promoter authorised by the owner.

14)

‘Approved’ means as approved/sanctioned by the Authority under applicable Byelaws

15)

‘Architect’- means a person registered as an architect under the provisions of the Architects Act, 1972

(20 of 1972)

16)

‘Auditorium’ means Premises having an enclosed space to seat audience and stage for various

performances such as concerts, plays, music etc.

17)

‘Authority’- means Mangaluru City Corporation and which, for the purpose of administering /

undertaking the various functions specified in these Byelaws, may authorize the Commissioner or any

other designated officer of Local Body to act on its behalf; hereinafter called the ‘Authority’.

18)

‘Balcony’ means a horizontal projection with a handrail or balustrade, to serve as passage or sit out

place.

19)

‘Basement storey or cellar’ means any storey, which is partly / wholly below the average ground level

contiguous to the building, with one or more than one level. The basement height should not project

more than 1.2m above the average ground level.

20)

‘Bifurcation’ means sub-division of a building site into two.

21)

‘Building’- means a structure constructed with any materials whatsoever for any purpose, whether

used for human habitation or not, and includes: -

i. a house, out-house, stable, privy, shed, hut, wall, verandah, fixed platform, plinth, doorstep and any

other such structure, whether of masonry, bricks, wood, mud, metal or any other material whatsoever;

ii. a structure on wheels simply resting in the ground without foundation;

iii. a ship, vessel, boat, tent and any other structure used for human habitation or used for keeping or storing

any article or goods

iv. Foundation, plinth, walls, floors, roofs, chimneys, plumbing and building services, fixed platforms etc.

v. Verandahs, balconies, cornices, projections etc.

vi. Parts of a building or anything affixed thereto

4

vii. Any wall enclosing or intended to enclose any land or space, sign and outdoor display structures; etc.,

viii. Tanks constructed or fixed for storage of chemicals or chemicals in liquid form and for storage of water,

effluent, swimming pool, ponds etc.,

ix. All types of buildings as defined in (a) to (k) below, except tents, shamianas and tarpaulin shelters erected

temporarily for temporary purposes and ceremonial occasions, shall be considered to be ‘building’.

Types of Buildings based on use of premises or activity:

a)

‘Residential Building’- includes a building in which sleeping and living accommodation is provided for

normal residential purposes, with cooking facilities and includes one or more family dwellings,

apartments/flats, and private garages of such buildings.

b)

Educational Building’- Includes a building exclusively used for a school or college, recognized by the

appropriate Board or University, or any other Competent Authority involving assembly for instruction,

education or recreation incidental to educational use, and including a building for such other uses as

research institution. It shall also include quarters for essential staff required to reside in the premises,

and building used as a hostel captive to an educational institution whether situated in its campus or

outside.

c)

‘Institutional Building’- Includes a building constructed by Government, Semi Government

Organizations or Registered Trusts and used for medical or other treatment, or for an auditorium or

complex for cultural and allied activities or for an hospice, care of persons suffering from physical or

mental illness, handicap, disease or infirmity, care of orphans, abandoned women, children and infants,

convalescents, destitute or aged persons and for penal or correctional detention with restricted liberty of

the inmates ordinarily providing sleeping accommodation and includes Dharamshalas, hospitals,

sanatoria, custodial and penal institutions such as jails, prisons, mental hospitals, houses of correction,

detention and reformatories etc.

d)

Assembly Building’- means a building or part thereof, where groups of people (not <50) congregate or

gather for amusement, recreation, social, religious, patriotic, civil, travel and similar purposes and this

includes buildings of drama and cinemas theatres, drive-in theatres, assembly halls, city halls, town

halls, auditoria, exhibition halls, museums, kalyana mantapas, ‘mangal karyalayas’, skating rinks,

gymnasia, restaurants, eating or boarding houses, places of worship, dance halls, clubs, gymkhanas and

road, railways, air, sea or other public transportation stations and recreation piers.

e)

‘Business Building’- Includes any building or part thereof used principally for transaction of business

and/or keeping of accounts and records including offices, banks, professional establishments, court

houses etc., if their principal function is transaction of business and/or keeping of books and records.

f)

Commercial/Mercantile Building’- Includes a building or part thereof used as shops, stores or markets

for display and sale of wholesale and or retail goods or merchandise, including office, storage and service

facilities incidental thereto and located in the same building

g)

‘Industrial Building’- Includes a building or part thereof wherein products or material are fabricated,

assembled or processed, such as assembly plants, laboratories, power plants, refineries, gas plants, mills,

dairies and factories etc.

h) ‘Storage Building’- means a building or part thereof used primarily for storage or shelter of goods, wares,

merchandise and includes a building used as a warehouse, cold storage, freight depot, transit shed, store

house, public garage, hanger, truck terminal, grain elevator, barn and stables.

i)

‘Hazardous Building’- Includes a building or part thereof used for storage, handling, and manufacture

of processing of radioactive substances or highly combustible or explosive materials or of products which

5

are liable to burn with extreme rapidity and/or producing poisonous fumes or explosive emanations. And

storage, handling, manufacture or processing of which involves highly corrosive, toxic or noxious alkalis,

acids, or other liquids, gases or chemicals producing flame, fumes and explosive mixtures etc. or which

result in division of matter into fine particles capable of spontaneous ignition.

j)

‘Mixed Land Use Building’- means a building partly used for non-residential activities and partly for

residential purpose.

k)

‘Wholesale Establishment’- means an establishment wholly or partly engaged in wholesale trade and

manufacture, wholesale outlets, including related storage facilities, warehouses and establishments

engaged in truck transport, including truck transport booking agencies.

Types of building based on design:

a)

‘Detached Building’- means a building with walls and roofs independent of any other building and with

open spaces on all sides within the same plot

b)

‘Semi-detached Building’- means two buildings, together having not more than 4 dwelling units with a

maximum of G+1 floor, attached to each other with a common wall and each building having setbacks

only on three sides.

c)

‘Row Housing’ – means two or more dwelling units with a maximum of G+1 floor, in a row attached to

each other, where the intermediate dwelling units have only front and rear setbacks and the dwelling

units on the extreme ends have setbacks on three sides.

Types of building based on height:

a)

B1- means residential buildings of G+1 floors up to 4 dwelling units

b)

B2- means all buildings up to G+2 floors other than B1 buildings and Industrial buildings

c)

B3- means all low-rise buildings other than B1 & B2 buildings and Industrial buildings.

d)

B4- means all high-rise buildings (multi storey buildings) other than Industrial buildings.

e)

B5- means all Industrial buildings

Types of building based on other features:

a)

‘Multi-Level Car parking’- means a building partly below ground level having two or more basements

or above ground level with two or more floors, primarily to be used for parking of cars, scooters or

any other type of light motorized vehicle.

b)

. ‘Unsafe Building’- Includes a building which:

i.

Is structurally unsafe, or

ii.

Is insanitary, or

iii.

Is not provided with adequate means of ingress or egress or

iv.

Constitutes a fire hazard or

v.

Is dangerous to human life or

6

vi.

In relation to its existing use, constitutes a hazard to safety or health or public welfare by

maintenance, dilapidation or abandonment.

Note: All unsafe buildings /structure will require be restoring by repairs, demolition or dealing with as

directed by the Local Authority. The relevant provisions of the Act shall apply for procedure to be

followed by the Local Authority in taking action against such buildings

22) ‘Building line’ means the line upto which the plinth of building may lawfully extend within the plot on a

street or an extension of a street and includes the line prescribed, if any in the Master Plan or Town

Planning scheme. No portion of the building may extend beyond this line. (Except as specified in ZR)

23) ‘Building Site’ means a site held for building purposes, approved as per Section 17 of KTCP Act.

24) ‘Bus Depot’ means a premise used by public transport agency or any other agency for parking,

maintenance and repair of buses. These may include the workshop.

25) ‘Bus Terminal’ means a premise used by public transport agency to park the buses for short duration

to serve the public. It may include the related facilities for passengers.

26) ‘Canopy’- shall mean a cantilevered projection from the face of the wall over an entry to the building at

the lintel or slab level provided that:

i.

It shall not project beyond the plot line.

ii.

It shall not be lower than 2.3 m. or 7’- 6’ when measured from the ground.

iii.

There shall be no structure on it and the top shall remain open to sky

27) ‘Carpet Area’ means the net usable floor area of an apartment or commercial premises, excluding the

area covered by the external walls, areas under services shafts, exclusive balcony or verandah area and

exclusive open terrace area, but includes the area covered by the internal partition walls of the

apartment/ commercial premises.

28) ‘Chajja’ means a continuous sloping or horizontal cantilever projection provided over an opening or

external wall to provide protection from sun and rain.

29) ‘Chimney’ means a structure usually vertical containing a passage or flue by which the smoke, gas, etc.

of a fire or furnace are carried off by means of which a draught is created.

30) ‘Common Wall’ means a wall built on land belonging to adjoining owners, the wall being the joint

property of both owners.

a)

If two adjoining owners build a dividing wall on their property, they are not common walls

and no part of the footings of either wall shall project on to the land of the adjoining owner,

except by legal agreement between the owners. And

b)

Any such ‘common’ or ‘dividing’ wall shall be considered for the purpose of these Byelaws,

as being equivalent to an external wall as far as the thickness and height are concerned.

31) ‘Community Hall’ means congregational place to be developed by government or local bodies, trust,

society, having a hall without separate kitchen and dining.

32) ‘Competent Authority’ means any state of central government authority which has jurisdiction /

authority over the areas / activities specified in the Building Byelaws, whose Rules, Regulations, Terms

and Conditions shall prevail over the Building Byelaws, wherever applicable

7

33) ‘Construction’ means; Any erection of a structure or a building, including any addition or extension

thereto either vertically or horizontally, but does not include any repair and renovation of an existing

structure or building, or, construction, maintenance and cleansing of drains and drainage works and of

public latrines, urinals and similar conveniences, or, the construction and maintenance of works meant

for providing supply of water for public, or, the construction or maintenance, extension, management for

supply and distribution of electricity to the public; or provision for similar facilities for publicity.

34) Contractor’ means the agency executing the works of any of the components of the building or land, on

behalf of the owner / Promoter, who is required to be registered under these Byelaws.

35) ‘Conversion of Occupancy’- means the change from one occupancy to other occupancy or any change

in building structure or part thereof resulting in a change of space and use requiring additional occupancy

certificate should comply with the provisions of section 14 and 14-A of the KTCP Act and after obtaining

permission under section 301 of KMC Act,1976”

36) ‘Corner Plot’ means a Building site facing two or more intersecting streets/roads.

37) ‘Corridor’ means a common passage or circulation space connecting separate rooms or different parts of

the same building including a common entrance hall.

38) ‘Cornice’- means a sloping or horizontal structural overhang usually provided over openings or external

walls to provide protection from sun and rain.

39) ‘Courtyard’ means a space permanently open to sky, enclosed fully or partially by buildings and maybe

at ground level or any other level either in the interior or exterior of a building within the site.

40) ‘Cultural buildings’ means a building built by a Trust, Society, Government or Local body for cultural

activities.

41) ‘Damp Proof Course’- means a course consisting of some appropriate water proofing material provided

to prevent penetration of dampness or moisture.

42) ‘Density of Households’ means number of dwelling units per hectare

43) ‘Density of Population’ means concentration of population expressed in terms of number of persons per

hectare in a particular area.

44) ‘Development’ with its grammatical variations means the carrying out of building, engineering, mining

or other operations in, or over or under land or water, or the making of any material change in any

building or land (including compound wall) or in the use of any building or land and includes sub-division

of any land.

45) DR/T.D.R.’ – means Development Rights or Transfer of Development Rights available for plots as

prescribed under Section 14B of KTCP Act and the Rules framed thereof.

46) ‘Drains’ as defined in KMC Act,1976.

47) ‘Drainage system’ – means a system or a line of pipes, with their fittings and accessories, such as

manholes, inspection chambers, traps, gullies, floor traps used for drainage of building or yards

appurtenant to the buildings within the same cartilage for conveying surface water or a system for the

removal of any waste water.

48) ‘Duplex’ means a dwelling unit in two levels connected with an internal staircase.

8

49) ‘Dwelling’- means a building or a portion thereof which is designed or used wholly or principally for

residential purposes for one family.

50) ‘Encroachment’- means an act to enter into the possession or rights either of permanent or temporary

nature on a land or built-up area of a private property or local body or state/central Government.

51) ‘Existing development’ means all developments (including buildings) which existed before coming into

force of the Karnataka Municipal Corporations Act 1976, and all approved developments thereafter

(including building) and which are completed or under development at the time of commencement of

these Byelaws.

52) ‘Existing development’ means all developments (including buildings) which existed before coming into

force of the Karnataka Municipal Corporations Act 1976, and all approved developments thereafter

(including building) and which are completed or under development at the time of commencement of

these Byelaws.

53) ‘Existing Use’- means use of a building or structure existing before the commencement of these Byelaws.

54) ‘Exit’ means a passage channel or means of egress from the building, its storey or floor to a street or,

other open space of safety; whether horizontal, outside and vertical exits meaning as under: -

i.

Horizontal exit means an exit, which is a protected opening through or around afire well or bridge

connecting two or more buildings.

ii.

Outside exit mean an exit from building to a public way to an open area leading to a public way or

to an enclosed fire-resistant passage leading to a public way, and

iii.

Vertical exit means an exit used for ascending or descending between two or more levels including

stairway, fire towers, ramps and fire escapes.

55) External Wall’ means the outer wall of the building not being a partition wall, even though an adjoining

wall of another building and also a wall abutting on an interior open space of any building.

External wall of an apartment or commercial premises means the outer wall of the apartment or

commercial premises, even though an adjoining wall of another apartment or commercial premises.

56) ‘First floor’ means the floor immediately above the ground floor or stilt, on which second and other floors

follow subsequently

57) ‘Flatted factory’ ‘means premises having Green and White industrial units, as specified by KSPCB and

these units may be located in multi-storeyed industrial buildings.

58) ‘Floor’ means the lower surface in a storey on which one normally walks in a building

59) ‘Floor Area’ means the area in each floor considered for calculating the FAR utilised in the building.

60) ‘Floor Area Ratio (FAR)’ means the quotient of the ratio of the combined gross floor area of all the floors,

excepting areas specifically, exempted under the Zonal Regulations, to the total area of the plot. Viz.

Floor

Area

Ratio =

Total floor area of all

the floors.

Plot Area

9

61)

‘Fire and/or Emergency Alarm System’- means Fire alarm system comprises of components for

manually or automatically detecting a fire, initiating an alarm of fire and initiating other actions as

appropriate.

62) ‘Fire Hazard Industries’-

i. ‘Low Fire Hazard Industries’ includes engineering industries using/processing or assembling non-

combustible materials i.e. lathe machines, steel works, steel components etc.

ii. Moderate Fire Hazard Industries includes industries using / processing combustible materials but not

flammable liquid etc., plastic industries, rubber, and PVC industries, textile, paper, furniture, flour

mills etc.

iii. ‘High Fire Hazard Industries’ includes industries using/processing flammable liquids, gases, chemicals

petroleum products, plastic or thermo setting group etc.

63) ‘Fire Lift’- Means a special lift designed for the use of fire service personnel in the event of fire or any

other emergency.

64) ‘Fire Proof Door’- Means a door or shutter fitted to a wall opening, and constructed and erected with the

requirement to check the transmission of heat and fire for a period.

65) ‘Fire Pump’- Means a machine, driven by external power for transmitting energy to fluids by coupling

the pump to a suitable engine or motor, which may have varying outputs/capacity but shall be capable

of having a pressure of 3.2 kg/ cm2 at the topmost level of multi-storey or high-rise building.

66) ‘Fire Pump-Booster Fire Pump’- Means a mechanical/electrical device that boots up the water pressure

at the top level of a multi-storey / high-rise building and which is capable of a pressure of 3.2 kg/cm2 at

the nearest point.

67) ‘Fire Resistance’-Fire resistance is a property of an element of building construction and is the measure

of its ability to satisfy for a stated period, some or all of the following criteria:

a) Load bearing capacity (Stability) The ability of a load bearing element to withstand fire exposure without

any loss of structural stability.

b) Integrity Resistance to penetration of flame and hot gases.

c) Insulation Resistance to temperature rise on the unexposed face up to a maximum of 180°C at any

single point and average temperature of 140°C.

68) ‘Fire Resistance Rating- The time that a material or construction will withstand the standard fire

exposure as determined by fire test done in accordance with the standard methods of fire tests of

materials/ structures as per the accepted standard as specified in Part IV of NBC.

69) ‘Fire Separation’- Means the distance in meters measured from any other building on the site or from

another site, or from the opposite side of a street or other public space to the building.

70) ‘Fire Brigade Inlet’- Means a connection provided at the base of a building for pumping up water through

in-built fire-fighting arrangements by fire service pumps in accordance; with the recommendation of the

Chief Fire Officer.

71) ‘Fire Tower’- Means an enclosed staircase that can only be approached from the various floors through

landings or lobbies separated from both the floor area and the staircase by fire resistant doors and open

to the outer air.

10

72) ‘Fire Resisting Building’- means a building in which material, which has, appropriate degree of fire

resistance is used.

73) Footing’- means a foundation unit constructed in stone masonry or concrete under the base of a wall or

column for the purpose of distributing the load over a larger area.

74) 'Form' means a Form appended these Byelaws.

75) ‘Foundation’ means that part of structure which is below the lowest floor and which provides support for

the superstructure and which transmits the load of the superstructure to the bearing strata.

76) ‘Frontage’ means the width of the site/land abutting the access/public road.

77) Gal1ery’- means an intermediate floor or platform projecting from a wall of an auditorium or a hall

providing extra floor area, and or additional seating accommodation and includes the structures provided

for seating in stadia.

78) ‘Garage-Private’- means a building or a portion thereof designed and used for the parking of vehicle.

79) ‘Garage-Public’ – means a building or portion thereof, designed other than as a private garage, operated

for gain, designed and/or used for repairing, servicing, using, selling or storing or parking motor driven

or other vehicles.

80) ‘Gas Go down’ means premises where LPG cylinders are stored.

81) Government’ means the Government of Karnataka.

82) ‘Ground Floor’ As defined in the Zonal Regulations.

83) ‘Ground Coverage’ means area covered by the building immediately above the ground level contiguous

to the building. Covered area does not include the space covered by ramps around the building, roof of

basement floor beyond the plinth of the building projecting above the ground level, structures for services

permitted in the setback area, garden, rocky area, well and well structures, plant, nursery, water pool,

swimming pool (if uncovered) platform around a tree, tank, fountain, bench with open top and unenclosed

sides by walls cut outs and ducts which are open to sky and the like drainage, culvert, conduit, catch-

pit, gully-pit, chamber gutter and the like, within the site, compound or boundary wall, gate, unstoreyed

porch and portico, Chejja, slide, swing, uncovered staircase, watchman booth, pump house and the like

within the site.

84) ‘Habitable Room’ means a room occupied or designed for occupancy by one or more persons for study,

living, sleeping, Eating, cooking but does not include bathrooms water closet compartments, laundries

serving and storage pantries, corridors, cellars, and spaces that are not used frequently or during

extended periods.

85) ‘Head room’ means the clear space between the finished floor level and ceiling/ beam bottom. Minimum

headroom shall be 2.4m.

86) ‘Heritage building’ Heritage Building" means a building possessing architectural, aesthetic, historic or

cultural values which is declared as heritage building by the Planning Authority or any other competent

authority within whose jurisdiction such building is situated

87) ‘Heritage Precinct’ means an area comprising heritage building or buildings and precincts thereof or

related places declared as such by the Planning Authority or any other Competent Authority within whose

jurisdiction such area is situated.

11

88) ‘High-rise Building’ means a building defined as High Rise Building in the Zonal Regulations of the

Master Plan of Mangaluru.

89) ‘Height of Building’ Building, Height of — The vertical distance measured, in the case of flat roofs from

the average level of the ground around and contiguous to the building or as decided by the Authority to

the terrace of last livable floor of the building adjacent to the external walls; and in the case of pitched

roofs, up to the point where the external surface of the outer wall intersects the finished surface of the

sloping roof, and in the case of gables facing the road, the midpoint between the eaves level and the ridge.

Architectural features serving no other function except that of decoration shall be excluded for the

purpose of measuring heights.

90) Hospital: means a premise providing medical facilities of general or specialized nature for treatment of

in-patient and out-patients.

91) Hotel: means Premises used for lodging with payment, with or without boarding facilities.

92) ‘Illuminated Exit Signs’- means a device for indicating the means of escape during normal

circumstances and power failure.

93) ‘Land use’ includes the purpose to which the site or part of the site or the building or part of the building

is in use or permitted to be used by the Authority. Land use includes Zoning of land use as stipulated in

the Master Plan and the Zonal Regulations.

94) ‘Licence’ means a valid permission or authorization in writing by the LocalAuthority to carryout

development of building or a work regulated by these Byelaws.

95) ‘Licensed Professional’’ means Qualified professionals who have been registered with the Local

Authority as per the Qualification and Competence as notified by the government.

96) ‘Lift’ means an appliance designed to transport persons or materials between two or more levels in a

vertical or substantially vertical direction by means of a guided car platform. The word ‘elevator’ is also

synonymously used for ‘lift’.

97) ‘Lobby’- means a covered space in which all the adjoining rooms open.

98) ‘Lodging House’ means a premise used for lodging on payment. This is synonymous to hotel

99) ‘Loft’ means a residual space above normal floor level which may be constructed or adopted for storage

purposes.

100)

‘Market value’ means the guideline value of the land notified under section 45B of the Karnataka

Stamp Act, 1957

101)

‘Master Plan’ means Master Plan prepared for the local planning area approved by the government

under the Karnataka Town and Country Planning Act, 1961. which is in force.

102) ‘Means of Escape’- means an escape route provided in a building for safe evacuation of occupants.

103) ‘Mezzanine Floor’ As specified in Zonal Regulations.

104) ‘Multilevel Car Parking (MLCP)’ means multilevel structure used for car parking connected to all

floors by means of ramps / mechanical elevators. MLCP can be an independent structure or part of a

building with other land uses. However, in the portion used for parking, no other land uses shall be

permitted.

12

105) ‘Multiplex complex’ means a building accommodating more than one auditorium and an

entertainment and cultural centre including food courts, restaurant, shops;

Explanation. - In case of Multiplex Complex, the portion of the permanent building used for the

purpose of Cinema theatres, auditorium including the areas for all ancillary uses such as projector

room, toilets, entrance/exit lobbies/corridors, food kiosks/cafes/ canteens attached to the theatre,

ticket counters shall only be considered;

106) ‘MCB/ELCB’ means Devices for tripping of electrical circuits in event of any fault in the circuit or

installation.

107) ‘Non-Combustible Material’- means a material which is not liable to burn or add heat to a fire when

tested for combustibility in accordance with the latest code of Bureau of Indian Standards Method of

Test for combustibility of Building Materials.

108) Nursing home means A premises having medical facility for in-patients and out patients, having up to

30 beds, it shall be managed by a doctor or a group of doctors.

109) ‘Occupancy or use’-means the principal occupancy or use for which a building or a part of a building

is intended to be used. For the purposes of classification of a building according to occupancy,

occupancy shall be deemed to include the subsidiary occupancies which are contingent upon it.

‘Mixed occupancy’ buildings being those in which more than one occupancy is present in different

portions of the buildings.

110) ‘Open space in a plot’ means an area forming an integral part of the plot, left open to sky.

111) ‘Owner’ A person, a group of persons or a body having a legal interest in land and/or building thereon.

112) ‘Parapet’ means a low wall or railing built along the edge of a roof or a balcony.

113) ‘Parking space’ means an area enclosed or unenclosed, covered or open sufficient in size to park

vehicles together with a drive-way connecting the parking space with a public street or any public area

and permitting the ingress and egress of the vehicles.

114) ‘Partition’ means an interior non-load bearing barrier, one storey or part-storey in height.

115) ‘Partition Wall’ includes (i)A wall forming part of a building and being used or constructed to be used

in any part of the height or length of such wall for separation of adjoining buildings belonging to

different owners or constructed or adopted to be occupied by different persons; or ii) A wall forming

part of a building and standing in any part of the length of such wall, to a greater extent than the

projection of the footing on one side or ground of different owners.

116) ‘Plinth’ means the portion of a structure between the surface of the surrounding ground and surface

of the floor immediately above the ground.

117) ‘Plinth Area’ means the built-up covered area of the building/ buildings immediately above plinth

level.

118) ‘Plinth Level’ means the level of the floor of a building immediately above the surrounding ground.

119) ‘Plot’ means as defined under section 17 of KTCP Act.

120) ‘Porch or Portico’ means a roof cover supported on pillars or cantilevered projection for the purpose

of pedestrian or vehicular approach to a building without any structure above.

13

121) ‘Premium F.A.R. shall be as defined in the Karnataka Town and Country Planning Act 1961 or the

notified Rules.

122) ‘Premises’ in a building means any portion of the building used for specific use other than the common

areas of the building and includes dwelling units.

123) ‘Professional on record’- means an Architect/Competent Professional who is brought on record to

represent his/her client for a construction project, to act on their behalf regarding Building Licences

and process of construction.

124) ‘Prohibited area’ means any area specified or declared to be a prohibited area under section 20A of

the Ancient Monuments and Archaeological Sites and Remains Act, 1958 (Central Act 24 of 1958).

125)

‘Promoter’ means –

a)

A person who constructs or causes to be constructed an independent building or a building consisting

of Apartments, or converts an existing building or a part thereof into Apartments, for the purpose of

selling all or some of the Apartments to other persons and includes his assignees; or

b)

A person who develops land into a project, whether or not the person also constructs structures on

any of the plots, for the purpose of selling to other persons all or some of the plots in the said project,

whether with or without structures thereon; or

c)

Any development Authority or any other public body in respect of Allottees of –

i.

Buildings or Apartments, as the case may be, constructed by such Authority or body on lands

owned by them or placed at their disposal by the Government; or

ii.

plots owned by such Authority or body or placed at their disposal by the Government; for the

purpose of selling all or some of the Apartments or plots, or

d)

An Apex State level co-operative housing finance society and a primary co-operative housing society

which constructs Apartments or buildings for its members or in respect of the Allottees of such

Apartments or buildings; or

e)

Any other persons who acts himself as a builder, coloniser, contractor, developer, estate developer or

by any other name or claims to be acting as the holder of a power of attorney from the owner of the

land on which the building or apartment is constructed or plot is developed for sale; or

f)

such other person who constructs any building or apartment for sale to the general public

Explanation – For the purpose of this clause, where the person who constructs or converts a building into

apartments or develops a plot for sale and the persons who sells apartments or plots are different persons, both

of them shall be deemed to be the promoters and shall be jointly liable as such for the functions and

responsibilities specified, under RERA Act or the rules and regulations made there under;

For the purpose of this clause, Apartment, whether called block, chamber, dwelling unit, flat, office, showroom,

shop, go down, premises, suit, tenement, unit or by any other name, means a separate and self-contained part

or an immovable property, including one or more rooms or enclosed spaces, located on one or more floors or any

part thereof, in a building or on a plot of land, used or intended to be used for any residential or commercial

use such as residence, office, shop, showroom or go down or for carrying on any business, occupation,

profession or trade or for any other type of use ancillary to the purpose specified;

This is synonymous to Developer.

14

126) ‘Protected monument’ means an ancient monument which is declared to be of national importance

by or under the Ancient Monuments and Archaeological Sites and Remains Act, 1958 (Central Act 24

of 1958).

127) ‘Public and semi-public building’ means a building which is for Public and Semi-Public uses specified

as per the Zonal Regulations.

128) ‘Pump room’ means the room provided below ground level adjacent to the sump tank to house various

types of pumps with self-priming mechanism. However, the entrance shaft of the pump room of

maximum 2 m x 2 m may be permitted above the ground level.

129) Recreational Club’ means a premise used for assembly of a group of persons for social and recreational

purposes with all related facilities.

130) ‘Regulated area’ means any area specified or declared under section 20B under the Ancient

Monuments and Archaeological Sites and Remains Act, 1958 (Central Act 24 of 1958).

131) ‘Repair Shop’ means a premise similar to retail shop for carrying out repair of house hold goods,

electronic gadgets, automobiles, cycles etc.,

132) ‘Restaurant’ means a premise used for serving food items on commercial basis including cooking

facilities, with covered or open space or both having seating facilities.

133) ‘Retail Shop’ means a premise for sale of commodities directly to the consumer with necessary storage.

134) ‘Retention Activity’ means an activity or use which is allowed to continue, notwithstanding its non-

conforming nature in relation to the use permitted in the adjoining or surrounding area.

135) ‘Road/Street’ shall be as defined in KMC Act 1976.

a)

The roadway over any public bridge or causeway;

b)

The footway attached to any such street, public bridge or causeway; and

c)

The drains attached to any such street, public bridge or causeway and the land, whether covered or

not by any pavement verandah or other structure which lies on either side of the roadway up to the

boundaries of the adjacent property, whether that property is private property or property belonging

to the Government or the Corporation.

136)

‘Road/Street Level or Grade’ shall be as defined in the Zonal regulations.

137) ‘Road/Street Line’ means the line defining the side limits of a road/street, where existing road width

is considered and the road widening line where proposed road width is considered.

138) ‘Road Width or Width of Road/Street’ means the right of way/distance between the boundaries of

the property on either side of the road including, carriageway, footways, service road at same level or

at different level and storm water drains as laid down in the city survey or Master Plan or the prescribed

road lines by any act of law and measured at right angles to the course or intended course of direction

of such road. In case of sides facing a T-junction or at the intersection of multiple roads, the width of

the road parallel to the side of the plot shall be considered.

139) ‘Room Height’ means the vertical distance measured from the finished floor surface to the finished

ceiling surface. Where a finished ceiling is not provided, the underside of the joists or beams or tie

beams shall determine the upper point of measurement.

15

140) ‘Service Apartments’ means fully furnished room or suite or rooms with kitchen, which is intended

to be used on rental basis.

141) ‘Service Road’ means a road / lane provided adjacent to a plot for access or service purposes as the

case may be and shall be parallel to the main road and may or may not be at grade with the main road

and shall be partly or fully falling within the proposed road width of the main road.

142) ‘Setback’ means the distance prescribed under the Zonal Regulations of the Master Plan of Mangaluru,

between the plot boundary and the plinth of the building or the covered Cantilever projection of the

building in any floor. If cantilever projection of the building is proposed, the prescribed setback shall

be provided between the plot boundary and such covered cantilever projection.

143) ‘Set-back Line’ means a line drawn at the setback distance, parallel to the plot boundaries or road

widening line as prescribed in the Master Plan / Zonal Regulations beyond which nothing can be

constructed towards the plot boundaries in any floor except as prescribed in the Zonal Regulations.

144) ‘Site Plan’ means a detailed Plan showing the proposed placement of structures, parking areas, open

space, landscaping, and other development features, on the plot as required by specific sections of

these Byelaws.

145) ‘Solar Assisted Water Heating System’ means a device to heat water using solar energy as heat

source.

146) ‘Spiral Staircase’ means a staircase forming continuous winding curve round a central point or axis

provided in an open space having tread without risers.

147) ‘Staircase room’ means a room accommodating the stair and for purpose of providing protection from

weather and not used for human habitation.

148)

‘Stair Cover’ means a structure with a covering roof over a staircase and its landing built to enclose

only the stairs for the purpose of providing protection from weather and not used for human habitation.

149) ‘Stilt floor’ As specified in Zonal Regulations.

150) ‘Storey’ means the space between the surface of one floor and the surface of the other floor vertically

above or below. The minimum floor to floor height shall not be less than 2.9m.

151)

‘To Erect’- in relation to a building means:

a)

To erect a new building on any plot whether previously built upon or not;

b)

To re-erect any building of which portions above the plinth level have been pulled down, burnt or

dismantled.

152) ‘TPO’ means an officer on deputation from the Department of Town and Country Planning.

153) ‘Un-authorised Development’- means the erection or re-erection, addition or alternations which is

not approved or sanctioned by the Competent Authority or as prescribed by the Government.

154) ‘Underground/Overhead Tank’ means an installation constructed or placed for storage of water.

155) ‘Utility Area’ means a covered area with at least one side open to the outside with the exception of 1m

high parapet on the upper floors to be provided on the open side.

156) ‘Ventilation’- means Supply of outside air into, or the removal of inside air from an enclosed space.

16

a) Natural Ventilation – means Supply of outside air into a building through window or other openings

due to wind outside and convection effects arising from temperature or vapor pressure differences (or

both) between inside and outside of the building.

b) Positive Ventilation – means the supply of outside air by means of a mechanical device, such as a fan,

c) Mechanical Ventilation – means supply of outside air either by positive ventilation or by infiltration by

reduction of pressure inside due to exhaust of air, or by a combination of positive ventilation and exhaust

of air.

157) ‘Water Closet (W.C)’- means water flushed plumbing fixture designed to receive human excrement

directly from the user of the fixture. The term is used sometimes to designate the room or compartment

in which the fixture is placed.

158) ‘Window’- means an opening to the outside other than a door, which provides all or part of the required

natural light or ventilation or both to an interior space and not used as a means of egress/ingress.

159)

‘Zonal Regulations’ means the regulations of the Master Plan governing land use and developments.

Words and expressions used in these bye laws but not defined shall have the same meaning as defined

in KTCP Act & KMC Act

CHAPTER -3

3.

JURISDICTION, APPLICABILITY AND PROCEDURAL REQUIREMENTS FOR OBTAINING BUILDING

LICENCE

3.1 Jurisdiction of Building Byelaws

These Building Byelaws shall apply to the building activity within Mangaluru City Corporation

3.2 Applicability of Building Byelaws

These building byelaws shall be applicable to all building activities under taken by private or Government

agencies and read in conjunction with the Master plan /Metropolitan development plan or any other statutory

plan in force, if any, and notifications, if any, with regard to the same and as amended from time to time and

these building bye-laws may be reviewed after five years. Till such time the reviewed building bye laws are

notified, these building bye laws will continue to be in force.

Notwithstanding any of the terms and conditions specified in the Building Byelaws, if any requirements /

conditions specified / imposed by the Competent Authority is applicable or if any approval from the

Competent Authority has to be obtained, for the development of buildings, as per the requirements of the

Competent Authority, such requirements / conditions shall be followed or such approvals shall be obtained,

as the case may be, for the development of the buildings

3.3 Applicability of Byelaws for all types of building developments

Except hereinafter or otherwise provided, these Byelaws shall apply to all development, redevelopment,

erection and/or re-erection of a building whether temporary or permanent as well as to the design,

construction of, or reconstruction and additions and alterations to a building.

17

3.4 Applicability of Byelaws for Part construction

Where the whole or part of a building is demolished or altered or reconstructed, except where otherwise

specifically stipulated, these Building Byelaws shall apply only to the extent of the work involved.

3.5 Change of use or occupancy

3.5.1

Where use of a building is changed, except where otherwise specifically stipulated, these Building

Byelaws shall apply to all parts of the building affected by the change.

3.5.2

If such change of use or occupancy is proposed during the course of construction which is in

accordance with the zonal regulations the procedure prescribed for revised licence shall be followed

and revised license should be obtained.

3.5.3

Any change of use or occupancy shall be permitted in a building after obtaining Occupation

Certificate, in case the changes proposed in the use or occupancy of the building satisfies all

requirements of these Byelaws, the Master Plan &Zonal Regulations subject to compliance of Section

14 & 14-A of KTCP Act, 1961, wherever applicable.

In such cases, the Owner shall submit revised drawings of the proposed change in use or occupancy and

submit the same to the Local Authority for revised licence. Such revised licence shall be issued only

after following the procedure prescribed for obtaining new Building Licence. The fees as specified in

Appendix VII shall be collected before issuing revised licence.”

3.6 Requirement in respect of building sites

3.6.1

Damp Site

Wherever the dampness of a site or the nature of the soil renders such precautions necessary, the ground

surface of the site between the walls of any building erected thereon shall be rendered damp-proof to the

satisfaction of the Local Authority

3.6.2

Minimum Size of Site

The minimum size of sites for the construction of different types of building or different use groups shall be

in accordance with provisions of the Master Plan, Zonal Regulations and Section 17 of KTCP Act 1961

3.6.3

Sanction for Building Sites

The building sites shall have sanction under Section 17 of KTCP Act 1961from the Planning Authority before

sanction is accorded under these Byelaws.

3.6.4

Restrictions on use of land for construction of buildings

No piece of land shall be used as a site for the construction of buildings under the following circumstances

a)

if the site is not drained properly or is incapable of being well drained;

b)

if the Local Authority considers that the site is insanitary or it is dangerous to construct a building

on it;

c)

if the building is proposed on any area filled up with filthy and offensive matter without a certificate

from the Health Officer and Corporation Engineer to the effect that it is fit to be built upon from

health and sanitary point of view;

18

d)

if the owner of the land has not shown to the satisfaction of the Local Authority that all the measures

required to safeguard the construction from constantly getting damp are being taken;

e)

if it violates any provisions of Section 17 of KTCP Act 1961 or any

provisions

of

Zonal

Regulations

Note: If the proposed use of the building on the plot does not conform to the land use proposals of the Master

plan or Zonal Regulations, permission from the Planning Authority for the change of land use has to be furnished.

3.7 Renovation / Retrofit / Demolition

3.7.1

Permission under these Byelaws shall not be given for renovation / retrofit in whole or part of a

building which has ceased to operate due to fire, natural collapse or demolition having been declared

unsafe, or which is likely to be demolished by or under an order of the Local Authority as the case

may be and for which the necessary certificate has been given by the Local Authority. However, in

case of buildings that are damaged partially due to fire and which can be restored may be permitted

for renovation/ retrofit after verification that the building or portion of the building is not declared as

unsafe building.

3.7.2 DEMOLITION OF BUILDING

Before a building is demolished, the owner shall notify all agencies having service connections within

the building, such as water, electric, gas, sewer and other connections. A permit to demolish a

building shall not be issued until a release is obtained from the agencies stating that their respective

service connections and appurtenant equipment, such as meters and regulators have been removed

or sealed and plugged in a safe manner. The owner shall, until notice thereof is given to the

Commissioner, that the building is demolished is liable for the payment of the property tax for which

he would have been liable had the building not been demolished or destroyed.

3.8 Existing Buildings

3.8.1

Existing approved Buildings

Nothing in these Byelaws shall require the removal, alteration or abandonment nor prevent continuance of

the lawfully established use or occupancy of an existing approved building unless, in the opinion of the Local

Authority such a building is unsafe or constitutes a hazard to the safety of adjacent property or to the

occupants of the building itself.

3.9 Development of Buildings

3.9.1

Building Licence

No person shall erect, re-erect or make addition/ alterations in any building or cause the same to be done

without, first obtaining a separate building license for each such building from the Local Authority

3.9.2

Building Licence obtained before these Byelaws:

Where any building licence which has been issued by the Local Authority before the commencement of these

Building Byelaws and where construction is in progress and has not been completed within the specified

period from the date of such licence, the said permission shall be deemed to be sanctioned under these

Byelaws and shall only be eligible for payment of validation extension fee there under. Accordingly, where the

19

validity of sanction has expired, and construction has not commenced, construction shall be governed by the

provisions of these Building Byelaws and building licence has to be obtained as per these Building Byelaws.

Provided that, if the building construction could not commence due to the orders of any competent court of

law, the construction may be permitted to commence as per the licensed plan, within three months of

clearance obtained from the court.

3.10

Procedure for obtaining building licence

3.10.1 Registration of Stake Holders

The following Stake Holders involved in the development activities in the ULB shall register themselves with

the Local Authority, as per the procedure prescribed in Appendix-I

a)

Promoters/ Developers who intend to undertake developments within the jurisdiction of the Local

Authority.

b)

Land owners who intend to undertake any building activity as per these Byelaws

c)

Professionals for preparing plans and details for obtaining sanction from the Local Authority (as

detailed in Appendix-II) and NOCs from different departments (as detailed in Appendix-IV), referred

as professionals for drawings.

d)

Professionals who intend to supervise the implementation of various components specified in the

plans sanctioned by the Local Authority, referred as professionals for supervision.

e)

Professionals who are licensed by the Local Authority (as detailed in Appendix-I) to inspect the

constructions / implementations as per the provisions of the approved plans.

f)

Contractors or Agencies implementing major components of the developments.

3.10.2 Application for building plan approval:

Every person (Owner or his authorised representative, including Promoter / Developer) who intends to

erect, re-erect or make alteration in any place in a building or demolish any building, shall apply in Form-I

along with the required documents (as detailed in Appendix-VI) and payment of necessary fees (as detailed

in Appendix-VII) along with all the drawings and details for obtaining building licence prepared by the

professionals on record for drawings (as detailed in Appendix- II). The Applicant shall submit Common

application containing details of Form-I or Form-II, as applicable, for obtaining the required NOCs, along

with the drawings and details for obtaining NOCs from other departments as applicable (as detailed in

Appendix-IV) and payment of necessary fees (as detailed in Appendix-VII).

3.10.3 Verification of documents submitted:

The Commissioner of the Local Authority shall verify the documents submitted along with the application

and if found in order, will accept the application. In case of any discrepancy, an endorsement shall be issued

in Form-III to the applicant stating the discrepancy and the applicant may rectify the same and resubmit to

the Local Authority.

3.10.4 Evaluation of Technical details submitted:

(1) If the application is accepted after finding that the documents submitted along with the application

are in order, the TPO of the Local Authority as specified in these Byelaws shall evaluate the Technical

drawing and details submitted by the Applicant, for compliance with the provisions of the Master

plan, ZR and Byelaws and compliance of the conditions incorporated for obtaining NOCs from

20

different departments and submit the evaluation report to the Commissioner of the Local Authority,

with noting of discrepancy, if any. The Commissioner shall approve the evaluation report with or

without accepting the noting of discrepancy.

(2) In case the noting of discrepancy is accepted by the Commissioner, an endorsement shall be issued

in Form-IV to the applicant stating the discrepancy and the concerned Licensed Professional may

rectify the same and resubmit to the Local Authority

3.10.5 Forwarding details to obtain NOCs and issuing NOCs:

(1) If the Technical drawing and details submitted are complying with the provisions of the Master Plan,

ZR and Byelaws and the requirements for obtaining NOCs from different departments, the

Commissioner of the Local Authority shall forward the application, technical drawings and details

submitted for NOCs to the concerned departments stating the timelines within which the NOCs have

to be issued, (as detailed in Appendix-IV), failing which the NOCs would be deemed to have been

issued.

(2) All the respective departments shall verify the drawing and details submitted along with the

application of the NOC and if found in order shall issue NOC within the timelines as notified by

government, with or without site inspection, as required and forward the NOC to the Local Authority.

(3) In case of any discrepancy, the concerned department shall issue endorsement to the applicant stating

the discrepancy and the applicant through the concerned Licensed Professional may rectify the same

and resubmit to the concerned Department.

3.10.6 Submission of Site Inspection Report

(1) If the Technical drawings and details submitted are accepted by the Commissioner, Commissioner shall

select the licensed professional (based on the qualification and competence and the procedure specified in

Appendix-V) and inform the licensed professional in Form-V to inspect the site and submit Site Inspection

Report for approval of site plan.

(2) On receipt of intimation from the Local Authority, the selected licensed professional shall inspect the site

and submit site inspection report (as detailed in Appendix-IX) in Form-VI to the Local Authority, with noting

of discrepancy, if any. The Commissioner shall approve the site inspection report

3.10.7 Action in case of discrepancy in site inspection report.

If any discrepancies are noted in the site inspection report and endorsement in Form-VII to the applicant

stating the discrepancy shall be issued and the applicant shall through the licensed professional rectify the

same and resubmit to the local authority.

3.10.8 Sanctioning of Building Licence

(1) On receipt of all the required NOCs from the concerned departments, or deemed NOCs issued by the Local

Authority (in case NOCs are not issued by the concerned departments within the timelines as notified by

government) and all the technical drawings and details accepted by the Local Authority and the Site Inspection

Report being consistent with the details submitted by the applicant, the Commissioner shall sanction the

Building Licence within the timelines as notified by government

(2) The Local Authority shall intimate the Applicant to pay the required fees (as specified in Appendix-VII for

the various NOCs as well as the Building Licence.

21

(3) The Commissioner of the Local Authority shall hand over the various NOCs received from the concerned

departments and sanction building licence after receiving the required fees from the Applicant.

3.10.8.1 Sanctioning of permission for demolition of buildings

The Applicant shall submit application for demolition of building along with the following details;

1. Key Plan

2. Site Plan

3. Building floor plans showing the area of existing building to be demolished

4. Estimated quantity of C&D Waste expected in the various categories of waste

5. Details of process of reuse, recycle and disposal of C&D Waste generated

6. release order obtained from the agencies stating that the respective service connections and

appurtenant equipment, such as meters and regulators have been removed or sealed and plugged in

a safe manner.

7. Latest tax paid certificate

3.11

Plans for Sanction

1)

All Building plans submitted to the Local authority shall be prepared as per the Jurisdictional Master

Plan, Zonal Regulations, Section 17 of KTCP Act 1961, Building Byelaws and the conditions of the

various NOCs required for the building.

2)

The drawings and details have to be submitted for the different types of buildings (B1, B2, B3, B4

and B5 Buildings) as follows;

3.11.1 Key Plan (For all types of Buildings):

The key plan to be submitted along with the application shall be the related portion of the approved road map

of the Local Authority on which the plot (on which Building sanction is applied for) is located (As detailed in

Appendix-IIA).

3.11.2 Site Plan (For all types of Buildings): (As detailed in Appendix-IIB)

3.11.3 Floor Plan of parking areas (For all types of Buildings) (As detailed in Appendix-II C)

3.11.4 Floor Plan of other uses (For all types of Buildings) (As detailed in Appendix-II D)

3.11.5 Sections of buildings (For all types of Buildings) (As detailed in Appendix-II E)

3.11.6 Elevations of buildings (For all types of Buildings) (As detailed in Appendix-II F)

3.11.7 Drawings for all services provided

a) Electrical system including energy saving measures and use of renewable energy (For B3, B4 & B5

Buildings) (As detailed in Appendix II-Ga)

b) Water supply system including water conservation measures (For B3, B4 & B5 Buildings) (As detailed

in Appendix II-Gb)

22

c) Rain water harvesting and ground water recharging systems (For all types of Buildings) (As detailed

in Appendix II-Gc)

d) Sewerage system including STP and usage of treated water (For all types of Buildings specified in

Table11.1) (As detailed in Appendix II-Gd)

e) HVAC System (For B2, B3, B4 & B5 Buildings wherever centralised HVAC system are proposed) (As

detailed in Appendix II-Ge)

3.11.8 Landscape plan (Buildings for which Table 15.1, 15.2 & 15.3 are applicable) (As detailed in

Appendix-II-H)

3.11.9 Circulation Plan indicating vehicular and pedestrian movement and parking facilities including

traffic impact study and report (Buildings for which Table 15.2 & 15.3 are applicable) (As

detailed in Appendix-II-I)

3.11.10 Structural Drawings and details (For B2, B3, B4 & B5 Buildings) (As detailed in Appendix-II-J)

3.11.11 Green Building drawings and details (Buildings for which Table 11.1 is applicable) (As detailed

in Appendix-II-K)

3.12

Signing of plans

3.12.1 Signing the Building Plans:

All plans for submission to the Local Authority shall be signed by the owner(s) and by the Competent

professionals on record (to prepare the required plans for sanction) for the building

3.12.2 Signing of plans for NOC:

All plans for submission to different departments for NOC shall be signed by the owner(s) and by the

competent professionals on record (to prepare the required plans for NOCs) for the construction project.

3.13

Alteration / Modification / Addition in Plans

The concerned professional on record for preparing the particular plan which has to be altered, modified or

added, shall make the necessary changes and submit to the Local Authority as detailed in Clause 3.15.5

with joint validation of applicant along with an application in Form-I and payment of required fees.

3.13.1 Alterations exempted from obtaining building licence

No building licence is necessary for the following alterations, which do not otherwise violate any provisions

regarding general building requirements, structural stability and fire safety requirements of these Byelaws;

a)

Plastering and patch repairs;

b)

Re-roofing or renewals of roof including roof of intermediate floors at the same specifications and

height;

c)

Flooring and re-flooring;

d)

Opening and closing of windows, ventilators and doors not opening into other properties and / or

public road/property;

e)

Replacing fallen bricks, stones, pillars, beams etc.

23

f)

Construction or re-construction of sunshade not more than 75cm in width within one’s land and not

overhanging over a public street;

g)

Construction or re-construction of parapet not more than 1.5 m. in height and also construction or

re-construction of boundary wall as permissible under these Byelaws;

h) White-washing, painting, etc. including erection of false ceiling in any floor at the permissible clear

height provided the false ceiling in no way can be put to use as a loft etc.;

i)

Reconstruction of portions of buildings damaged by storm, rains, fire, earthquake or any other

natural calamity to the same extent and specification as existed prior to the damage provided the use

conforms to provisions of Master Plan/Zonal Regulations;

j)

Erection or re-erection of internal partitions (within the specific premise) provided the same are within

the purview of the Byelaws.

Note: Any of the above activities in a building, shall not be permitted in the portion falling within the

proposed road widening line.

3.14

Fees for sanction of Building licence

Every person intending to construct or reconstruct or alter any building shall pay to the Local Authority, the

various fees prescribed in Appendix-VII. The Local Authority or the Government shall prescribe the rate of

fees, time to time.

Provided wherever the fee is fixed by the Local Authority the approval of the Government for the same is to

be sought by the Local Authority.

3.15

Sanction

3.15.1 Sanction by the Authority

3.15.2 The Local Authority shall issue the commencement certificate in Form-III of the Karnataka Planning

Authorities Rules, 1965 and sanction the building plan by signing the Building Licence and the

drawings.

3.15.3 Grant of Licence or Refusal

(1) The Local Authority shall either sanction or refuse sanction to the plans and specifications or may sanction

them with such modification or directions as he may deem necessary as per these Byelaws.

(2) In case where the building scheme requires the clearance of an Urban Art Commission, whenever

constituted for the city, the Local Authority shall issue the building license only after getting the clearance

from the Urban Art Commission.

(3) The licence shall be issued by the Local Authority for the different types of buildings within the timelines

as notified by government, failing which the sanction shall be deemed to have been accorded, provided that

the failure to sanction the licence by the Local Authority within the timelines is immediately brought to the

notice of the Local Authority in writing by the person who has applied for licence. On receiving such intimation

from the applicant, if the Commissioner fails to issue the licence within seven days, the licence shall be

deemed to have been sanctioned and issued by the Local Authority. In such an event, the applicant shall

submit an affidavit & undertaking to the Local Authority stating that drawings and details submitted by him

24

for obtaining licence are prepared as per the provisions of the jurisdictional Master plan, Zonal Regulations

and these Building Byelaws and all other applicable laws, including those related to NOCs issued for the

project and he would execute the works as per such drawings and details submitted and the applicable laws

and he shall be responsible for any violations or deviations. Nothing shall be construed to authorize any

person to do anything in contravention or against the terms of the lease or title of the land or against any

regulations, Byelaws or ordinance operating at the time of execution of the work at site.

(4) It is further clarified that:

a) The above provision of deemed sanction shall be applicable only in those cases where the building plan are

in conformity with the Master Plan/Zonal Regulations/Byelaws/ Section 17 of KTCP Act 1961.

b) No application under Clause3.10.2 shall be valid unless the information required by the Local Authority

under these Byelaws or any further information which may be required has been furnished to the satisfaction

of the Local Authority and

3.15.4 Duration of Sanction, Revalidation and revised Sanction

(1) Once a building licence is sanctioned, the duration of Sanction, revalidation and revised sanction shall be

as prescribed in Appendix-X;

Provided that, if the construction is not completed within the timelines prescribed in Appendix-X, the

applicant shall pay the required fee as prescribed in Appendix-VII for extension of validation of licence.

(2) The project shall be completed within the timelines prescribed in Appendix-X. The validity period of

sanction shall be extended as specified in Appendix-X in case of additions / alterations proposed in the

project or for any other reason specifically mentioned. If multiple blocks / buildings are proposed in the

sanctioned plan, a schedule of executing the blocks in sequence has to be specified and the timelines for

completing each of the multiple blocks shall be permitted accordingly as specified in Appendix-X.

(3) If the Applicant intends to avail extension for the validity period of the sanction, he shall make an

application stating the reason for not completing the project within the validity period and the validity of

sanction shall be extended for one year after paying the fees for extension of validation as prescribed in

Appendix-VII.

(4) If the building is not completed within the period of revalidation, he may avail further extension of the

validity period after repeating the procedure specified in clause 3.15.4(3).

(5) Revalidation shall not be permitted if the construction has not commenced within the validation period of

two years from the date of sanction. In such cases the Applicant has to apply for revised sanction as per the

Master Plan / Zonal Regulation and Building Byelaws as in force at the time of application of revised sanction

3.15.5 Revised Licence during the course of construction:

a)

The Applicant has to apply for revised building licence if the Applicant intents to make changes from

the sanctioned plans in any or all of the following, but within the provisions of the Zonal Regulations,

Section 17 of KTCP Act 1961, and these Byelaws;

i.

Setbacks

ii.

Coverage

iii.

FAR

iv.

Car parking

25

b)

The Local Authority shall issue revised licence after collecting the fees as prescribed in Appendix VII

before issuing the Occupancy Certificate.

c)

If the revised licence is applied during the execution of work of the building for which revised licence

is applied, then construction of the portion of the building for which revised licence is sought for,

shall not be commenced unless the revised licence is issued by the Local Authority.

3.15.6 Revocation of Licence:

a)

The Local Authority shall revoke any building licence issued under the provisions of these Byelaws,

wherever there has been any false statement, misrepresentation of material facts in the application

on which the building licence was based or if during construction it is found that the Owner has

violated any of the provisions of these Building Byelaws or sanctioned plan or compoundable limits.

Revised sanction of building plans and occupancy certificate shall be taken from the Local Authority

after bringing the building within the framework of Master Plan/ Zonal Regulations/Building

Byelaws.

b)

Any construction made in violation of Master Plan / Zonal Regulations / Building Byelaws / Section

17 of KTCP Act / Conditions of various NOCs issued, etc. based on the licence issued by providing

false information / documents / details / drawings by the Applicant shall be considered as

unauthorised and revised licence shall be issued only after such unauthorised portion of the

constructions are demolished or regularised as per law. The Applicant shall not seek protection under

the pretext that such unauthorised construction was made as per the licence issued.

3.15.7 Withdrawal of Building Licence:

If the Owner / Applicant decides not to construct the building for which Building Licence is obtained from

the Local Authority, he may apply to the Local Authority to withdraw the Building Licence issued (if the

construction of the building has not commenced and Licence is within the validation period). On receipt of

such application for withdrawal of Building Licence, the Local Authority shall withdraw the Building Licence

issued.

3.15.8 Qualification and Competence:

Qualification and competence of all professionals registered shall be as specified in Government Notification

No. UDD 14TTP 2017 dated 30.10.2017.

3.16 Execution of works at site

3.16.1 Construction to be in Conformity with Byelaws

Owners’ liability: Neither the granting of the permission nor the approval of the drawing and specification,

nor inspection by the Local Authority or the licensed professional during erection of the building shall in any

way relieve the Owner of the building or the promoter on behalf of the owner, from full responsibility for

carrying out work in accordance with these Byelaws.

3.16.2 Commencement of work:

The owner, within the validity period of the building plan sanction given, shall start the construction work at

the site for which building license has been granted, under the supervision of the licensed professional. The

owner and the licensed professional with the required qualification/Competences specified in the Government

Notification No. UDD 14TTP 2017 dated 30.10.2017 and subsequent modifications notified by the

Government shall be required to follow the procedure during construction work as prescribed in these

Byelaws.

26

3.16.3 Appointment of professionals on record for supervision

The owner, to whom a licence is issued, shall engage the services of the licensed professional to supervise the

construction of the various components of the building, before the commencement of works at site and the

licensed professional shall submit the Completion Report.

3.16.4 Intimation of commencement of work at site and issuing commencement certificate

(1) The applicant and the Licensed professional shall intimate the Local Authority within the 5th day of every

three month from the date of sanctioning the building licence, that the construction work has not commenced

at site, along with the letter of undertaking that the work has not commenced at site.

(2) The Applicant and the Licensed professional shall intimate the Local Authority at least one day before the

commencement of works at site.

(3) The Commissioner shall issue Plinth Commencement Certificate in Form-VIII-A within seven days of

receiving satisfactory inspection report from the designated officer regarding the commencement of foundation

work at site.

3.16.5 Documents at Site:

(1) The person to whom a licence is issued shall, during construction, display in a conspicuous place on the

exterior wall / fence near the entrance gate to the site, in Form-IX.

(2) The details specified in Appendix-XI shall be maintained in the site office throughout the period of

construction, until Occupation Certificate is issued by the Local Authority and shall be available for

verification of the Local Authority or the licensed professional appointed by the Local Authority for certification

of works.

3.16.6 Procedure during construction

(1) The Applicant and the Licensed professional shall intimate the Local Authority, on the completion of

various stages of construction

(2) On receiving the intimation from the Applicant, the designated officer of the Local Authority shall

certify the stage of completion of work intimated.

(3) The designated officer of the Local Authority shall inspect the site and after checking the work

completed as indicated, certify the same in Form-X

(4) During inspection, according to the designated officer of the Local Authority, if the work executed by

the Applicant is not as per the approved plans, specifications and other provisions of these Byelaws, he

shall intimate the Local Authority in Form-X, stating the defects in the works executed, along with the

photos of such defective works.

(5) Local Authority shall issue endorsement to the Applicant in Form-XI, to rectify the defects.

(6) On receiving the endorsement from the Local Authority, the Applicant shall rectify the defects and

intimate the Local Authority.

(7) According to the Applicant or the Licenced Professional if the defects mentioned in the endorsement

is incorrect, the Applicant may file objection, to the Local Authority, stating the correctness of the works

executed, along with the photos to prove the correctness, if required.

27

(8) If objection is received from the Applicant, the Commissioner shall conduct joint inspection along with

the Applicant, the concerned Licenced Professional and the designated officer by giving notice to all, to

conduct joint inspection within seven days of receiving objection.

(9) During the joint inspection, the Commissioner, after hearing the views of both the parties, shall either

accept or reject the objection raised by the Applicant and instruct the Applicant accordingly after making

his inspection report in Form-XII and the Applicant shall abide by the decision of the Local Authority

and rectify the defects mentioned in Form-XII, if any, and intimate the same to the Local Authority.

(10) On receiving the intimation of defect rectification by the Applicant, the designated officer of Local

Authority shall inspect and certify the rectified work.

12) The applicant/owner/developer and Licenced Professional shall take necessary precaution to

control the epidemic/ communicative diseases like Malaria, Dengue etc.

3.16.7 Action against works executed without intimation and works not rectified

(1) Any works executed in the building without the certification of the preceding works specified in Appendix-

XII and the works not rectified as intimated in Form-X, shall be liable for penalty as per the Provisions of

KMC Act.

(2) In such cases, the owner or the promoter, as the case may be, and the Licenced professional shall also be

liable for action as per the provisions of the KMC Act.

3.17 Safety measures to be taken during construction

The safety measures specified in Part VII of NBC 2016 and as per best practice of the construction industry

shall be adopted by the applicant in the construction site during the construction period.

3.18 Completion of project and submitting Completion Certificate

3.18.1 Submitting Completion Certificate

(1) On completion of all works at site that have been certified by the designated officer as specified in

Appendix-XII, as per the specifications and other provisions of these Byelaws, the Licensed professional,

shall submit Completion Certificate in Form-XIII, along with the certification of Structural design and safety

in Form-XV.

(2) In case of independent Residential Houses and Industrial buildings, the Licensed professional shall submit

work Completion Certificate only if all the works within the building and the yard are completed.

(3) In case of other Residential and Non-Residential buildings, the Licensed professional shall submit work

Completion certificate only if all the works are completed in the common areas of the building, the exterior of

the building and services to be provided in the Apartments, Commercial and other Premises of the building

are also completed.

3.18.2 Submitting Partial Completion Certificate.

(1) In case of partial completion of the building, partial work Completion Certificate may be submitted by the

Licensed professional for the number of floors (starting from the lowermost floor moving upwards) upto

28

which all works of the common areas and exterior of the building are completed and services to be provided

in the Apartments, Commercial and other Premises of those floors of the building are also completed.

In such cases, necessary Clearance Certificate or any other form of approval shall be obtained from the

concerned Departments from which NOCs are obtained for issuing Building Licence (wherever there is a

condition in the NOC to obtain Clearance Certificate or any other form of approval that has to be obtained

from them before issuing Occupation Certificate to the Building or allowing occupation in the building),

for such partial occupation of the building, before the Local Authority issues partial Occupation Certificate

3.18.3 Approval of works from other Departments

(1) The Licensed professional with the required qualification notified by the Government shall submit the

required applications in Form-II (any or all of a, b, c, d, e, f, g, h, i and j, as applicable),for approvals from

other departments for the construction done at site as per the NOCs issued (only in cases where the condition

for obtaining clearance certificate / certificate for the approval of works done, is mentioned in the NOC).

(2) On receiving the Work Completion Certificate and the application to various departments for approving

the works executed at sites as per the NOCs issued, the Local Authority shall intimate all the concerned

Departments which have issued NOCs.

(3) On receiving the intimation from the Local Authority, the concerned Departments which had issued NOCs,

shall issue the required Certificates of Approval for the construction done at site, wherever applicable, with

or without site inspection.

(4) During the site inspection, according to the Designated Officer of the concerned Department, if any of the

works executed at site is not as per the conditions/specifications of the NOC issued, he shall issue

endorsement through the Authority, to the Applicant, along with the photographs of the defective works, to

rectify the defects.

(5) On receiving the endorsement from such Departments through the Local Authority, the Applicant shall

rectify the defects and intimate the concerned Department.

(6) According to the Applicant or the concerned licensed professional if the defects mentioned in the

endorsement is incorrect, the Applicant may file objection, to the concerned Department and the Local

Authority, stating the correctness of the works executed, along with the photos to prove the correctness, if

required.

(7) If objection is received from the Applicant, the Commissioner shall conduct joint inspection along with the

Applicant, the concerned licensed professional, the designated officer of the local authority and the Designated

Officer of the concerned Department who has issued the endorsement for defective work, by giving notice to

all, to conduct joint inspection within seven days of receiving objection.

(8) During the joint inspection, the Commissioner, after hearing the views of both the parties, shall either

accept or reject the objection raised by the Applicant and instruct the Applicant accordingly after making his

Inspection Report in Form-XII (copy of the same to be sent to the Designated Officer of the concerned

Department) and the decision of the Commissioner shall be final. The Applicant shall abide by the decision

of the Local Authority and rectify the defects mentioned in Form-XII, if any and intimate the Local Authority.

(9) On receiving the intimation of defect rectification by the Applicant, the designated officer of the local

authority shall inspect the site and after checking the work rectified as indicated in Form- XII, certify the

same in Form- X.

29

(10) The Local Authority shall forward the certification issued in Form-X by the designated officer of the

concerned Department and the concerned Department shall issue the required Certificate of Approval for the

construction done at site, with or without site inspection

3.19 Occupancy Certificate

On receiving the Completion Certificates from the applicant through the Licenced Professional and the

necessary Approvals from the concerned Departments, wherever applicable, the Local Authority shall issue

Occupancy Certificate in Form-XIV to the building constructed as per these Byelaws.

3.19.1 Occupancy or letting of the new buildings–

No person shall occupy or allow any other person to occupy any new building or part of a new building for

any purpose whatsoever until Occupancy Certificate to such buildings or part thereof has been granted

3.19.2 Occupancy/ Part Occupancy Certificate for Phased Project-

In such cases where a project has not been completed at one stretch but constructed in different stages, part

Occupancy Certificate for the building otherwise complete in all respects, may be issued subject to the

condition that;

(a) part work Completion certificate is submitted by the licensed professionals.

(b) The remaining construction of the building is completed within the validity period or the extended validity

period.

Connection to the Municipal Sewer / Water Mains and Power Supply system of MESCOM

1)

Temporary connection for water, electricity or sewer, permitted for the purpose of facilitating the

construction, shall not be allowed to continue in the premises without obtaining occupancy

certificate.

2)

No new connection to the Municipal Water Mains or to the Municipal Sewer line with a building shall

be made without obtaining occupancy certificate and any existing connection provided for

construction shall be disconnected if the building is occupied without Occupancy Certificate.

3)

Permanent power supply to the building shall also not be provided to any new building unless the

building has received Occupancy Certificate / Part Occupancy Certificate

4)

In case the use is changed, or unauthorized construction is made, the Local Authority is authorized

to discontinue such services or cause discontinuance of such services.

3.20 Changes to be made in the approved plans after the completion of the project:

1)

If the owner/s who intend/s to make any changes / deviations in the building from the sanctioned

plan, after the completion of the project, the owner/s through the Licenced Professional shall make

the necessary changes and submit to the Local Authority with joint validation of Applicant along with

an Application in Form-I and payment of required fees.

.

2)

Any such proposed changes from the sanctioned plans shall be as per the provisions of the Master

Plan and its Zonal Regulations, these Byelaws or any other relevant laws.

3) The proposed changes shall be executed at site only after obtaining the approval for

such modifications/changes from the Local Authority.

30

Note: The applicant for revised licence may be the Owner/s of the premises of the completed building

or the Promoter who has developed the building.

3.21 Action in case of certain violations in the construction of Buildings

Till the time of demolition of additional area built violating the provisions of Zonal regulations, Local

Authority may disconnect utilities such as water supply and Sewerage to the entire building and also

order MESCOM to disconnect power supply to the entire building.

CHAPTER-4

4. DEVELOPMENT REGULATIONS

The provisions contained in Master Plan/Zonal Regulations shall apply and where these are silent on

such issues or which require interpretation, the norms as decided by the Authority, shall apply. The

provisions include but are not limited to the use/activity of premises, ground coverage, FAR,

setbacks, open space, height and parking standards for Residential premises on plotted development,

Group housing, Resettlement colonies, Slums, In-situ up gradation, Non-residential premises. The

permission of uses/use activities in use premises shall be permitted in accordance with provisions of

Master Plan and Zonal Regulations. The object of these regulations is to provide control for

building/buildings within use premises excluding the internal arrangement, which is covered and

controlled by Building Byelaws.

CHAPTER – 5

5. GENERAL BUILDING REQUIREMENTS AND SERVICES

5.1 Requirements for Parts of Buildings

5.1.1

Plinth

5.1.1.1 The plinth or any part of a building or outhouse shall be so located with respect to the

surrounding ground level that adequate drainage of the site is assured. The height of the plinth

shall be not less than 450 mm from the surrounding ground level, in case of independent houses

and not less than 300mm in case of other buildings

5.1.1.2 Interior Courtyards and Covered Parking: Every interior courtyard shall be raised at least 150

mm above the determining ground level and shall be satisfactorily drained.

5.1.2

Habitable Rooms

5.1.2.1 Height

The clear height of all rooms for human habitation shall not be less than 2.75 m measured from the

surface of the floor to the lowest point of the ceiling (bottom of slab) provided that the minimum clear

headway under any beam shall not be less than 2.4 m. In the case of pitched roof, the average height of

rooms shall not be less than 2.75 m. The minimum clear head room under a beam, folded plates or eaves

shall be 2.4 m. In the case of air-conditioned rooms, a height of not less than 2.4mmeasured from the

surface of the floor to the lowest point of air-conditioning duct or the false ceiling shall be provided.

31

5.1.2.2 The requirements of clause 5.1.2.1 shall apply to residential, business and mercantile

buildings. For educational and industrial buildings, the following minimum requirements apply:

Table 5.1Minimum height requirement for educational and industrial buildings

Sl. No

Type of Occupancy

Ceiling height

1

Educational Buildings

Ceiling height 3.6m for all regions

2

Industrial Buildings

Ceiling height 3.6m, except when air-conditioned, 3m

(Factory Act 1948 and Rules therein shall govern such heights,

where applicable)

5.1.2.3 Size

The area of habitable room shall not be less than 9.5 Sqm, where there is only one room with a minimum

width of 2.4 m. Where there are two rooms, one of these shall not be less than 9.5Sqm and the other not

less than 7.5Sqm, with a minimum width of 2.1 m.

5.1.3

Kitchen

5.1.3.1 Height

The height of a kitchen measured from the surface of the floor to the lowest point in the ceiling (bottom of

slab) shall not be less than 2.75 m, except for the portion to accommodate floor trap of the upper floor.

5.1.3.2 Size

The area of a kitchen where separate dining area is provided shall be not less than 5.0 Sq. m with a

minimum width of 1.8 m. Where there is a separate store, the area of the kitchen may be reduced to 4.5

Sq. m. A kitchen, which is intended for use as a dining area also, shall have a floor area of not less than

7.5 Sq. m with a minimum width of 2.1 m.

5.1.3.3 Other Requirements

Every room to be used as kitchen shall have:

a) Unless separately provided in a pantry, means for the washing of kitchen utensils which shall lead

directly or through a sink to a grated and trapped connection to the waste pipe

b) An impermeable floor

c) A flue, if found necessary

5.1.4

Bathrooms and Water-Closets

5.1.4.1 Height

The height of a bathroom or water-closet measured from the surface of the floor to the lowest point in the

ceiling (bottom of slab) shall not be less than 2.1 m.

32

5.1.4.2 Size

The area of a bathroom shall not be less than 1.8 Sqm with a minimum width of 1.2m. The floor area of

water-closet shall be 1.1 Sqm with a minimum width of 0.9 m. If bath and water-closet are combined, its

floor area shall not be less than 2.8 Sqm with a minimum width of 1.2 m.

5.1.4.3 Other Requirements

Every bathroom or water-closet shall:

a)

Be so situated that at least one of its walls shall face a shaft or open space

b)

Not be directly over or under any room other than another water-closet, washing place, bath or

terrace, unless it has a water-tight floor;

c)

Have the platform or seat made of water-tight non-absorbent material;

d)

be enclosed by walls or partitions and the surface of every such wall or partition shall be finished

with a smooth impervious material to a height of not less than 1 m above the floor of such a

room;

e)

Be provided with an impervious floor covering, sloping towards the drain with a suitable grade

and not towards VERANDAH or any other room; and

f)

Have a window or ventilator, opening to a shaft or open space, of area not less than 0.3 Sqm

with side not less than 0.3 m.

5.1.4.4 No room containing water closets shall be used for any purpose except as a lavatory and no such

room shall open directly into any kitchen or cooking space by a door, window or other opening.

Every room containing water-closet shall have a door completely closing the entrance to it.

5.1.5

Loft

5.1.5.1 Height

The minimum head-room of loft shall be 2.2 m. The maximum height of loft shall be 1.5 m.

5.1.5.2 Size

A loft in a habitable room shall not cover more than 25 percent of the area of the floor on which it is

constructed and shall not interfere with the ventilation of the room under any circumstances.

5.1.6

Mezzanine Floor

5.1.6.1 Height

It shall have a minimum height of 2.2 m.

5.1.6.2 Size

The minimum size of the mezzanine floor, if it is to be used as a living room, shall not be less than 9.5

Sqm. The aggregate area of such mezzanine floor in a building shall in no case exceed one third the plinth

area of the building.

33

5.1.6.3 Other Requirements

A mezzanine floor may be permitted over a room or a compartment provided:

a)

it conforms to the standard of living rooms as regards lighting and ventilation in case the size of

mezzanine floor is 9.5 Sqm or more

b)

It is so constructed as not to interfere under any circumstances with the ventilation of the space over

and under it;

c)

Such mezzanine floor is not sub-divided into smaller compartments;

d)

) Such mezzanine floor or any part of it shall not be used as a kitchen; and

e)

In no case shall a mezzanine floor be closed so as to make it liable to be converted into unventilated

compartments.

5.1.7

Store Room

5.1.7.1 Height

The height of a store room shall be not less than 2.1m.

5.1.7.2 Size

The size of a store room, where provided in a residential building, shall be not less than 3 Sqm

5.1.8

Garage

5.1.8.1 Height The height of a garage shall be not less than 2.4 m.

5.1.8.2 Size

The size of garages shall be as per Zonal regulations.

5.1.9

Basement

5.1.9.1 The Local Authority in accordance with the land use and other provisions specified under the

Zonal Regulations shall allow the construction and usage of the basement

5.1.9.2 The basement shall have the following requirements:

a) Every basement shall be in every part at least 2.4 m in height from the floor to the underside of the roof

slab or ceiling;

b) Adequate ventilation shall be provided for the basement. The ventilation requirements shall be the same

as required by the particular occupancy according to byelaws. Any deficiency may be met by providing

adequate mechanical ventilation in the form of blowers, exhaust fans, air conditioning systems, etc;

c) The height of the ceiling of any basement shall be minimum 0.9 m and the maximum, 1.2 m above the

average surrounding ground level. However, in case of parking, mercantile or business occupancy at

ground floor, minimum height of the ceiling of the basement maybe 0.3 m above the average surrounding

ground level subject to mechanical ventilation being provided (see Fig. 11);

d) Adequate arrangements shall be made such that surface drainage does not enter the basement;

34

e) The walls and floors of the basement shall be watertight and be so designed that the effects of the

surrounding soil and moisture, if any, are taken into account in design and adequate damp proofing

treatment is given;

f) The access to the basement shall be separate from the main and alternative staircase providing access

and exit from higher floors. Where the staircase is continuous in the case of buildings served by more than

one staircase, the same shall be of enclosed type serving as a fire separation from the basement floor and

higher floors. Open ramps shall be permitted if they are constructed within the building line subject to the

provision of (d);

g) Access to basements through ramps shall be permitted subject to provision of (d).

h) For all public buildings and uses including group housing, having basement going up to more than

one level, access to all levels shall also be provided through lift. The exit requirements in basements shall

comply with the provisions of Part 4 ‘Fire and Life Safety’ of the Code.

5.1.10 Chimneys

The chimneys shall be built at least 0.9 m above flat roofs, provided the top of the chimneys is not below

the top of the adjacent parapet wall. In the case of sloping roofs, the chimney top shall not be less than

0.6 m above the ridge of the roof in which the chimney penetrates.

5.1.11 Parapet

Parapet walls and handrails provided on the edges of roof terraces, balcony, verandah, etc. shall not be

less than 1.0 m and not more than 1.5m in height from the finished floor level. The railings / parapet

wall shall be designed by keeping in mind the safety of children.

Note:

i. The above shall not apply where roof terrace is not accessible by a staircase.

ii. However on terrace floor in the portion where installations like DG Set, Water Tank and other, screening

parapet of a suitable height may be constructed to hide such equipment’s etc. and there is no need to have

uniform increase in the height of the parapet.

5.1.12 Boundary Wall

The requirements of the boundary wall shall be as follows:

a) Except with the special permission of the Local Authority, the maximum height of the compound wall

shall be 1.5 m above the average level of the front street measured at the center line of the road.

Compound wall up to 2.4 m height may be permitted if the top 0.9 m is of open type construction of a

design to be approved by the Local Authority.

b) In the case of a corner plot, the height of the boundary wall shall be restricted to 0.75 m for a length

of 6 m on the front and side of the intersections and the balance height of 0.75 m, if required in accordance

with (a) may be made up of open type construction (through railings) and of design to be approved by the

Local Authority.

c)

However, the provisions of (a) and (b) are not applicable to boundary walls of jails. In electric sub-

stations, transformer stations, institutional buildings like sanatoria, hospitals, industrial buildings like

workshops, factories and educational buildings like schools, colleges, including hostels and other uses of

35

public utility undertakings and strategically sensitive buildings, a height up to 2.4 m may be permitted

by the Local Authority.

5.1.13 Septic Tanks

Where a septic tank is used for sewage disposal, the location, design and construction of septic tank shall

conform to requirements as specified in Annexure-XVA of Appendix-XV.

5.1.14 Office-cum-Letter Box Room

In the case of multi-storeyed multifamily dwelling apartments constructed by existing and proposed

Cooperative Housing Societies or Apartment Owners Associations, limited companies and proposed

societies, an office-cum-letter box room of dimension 3.6 m × 3 m shall be provided on the ground floor.

In case the number of flats is more than 20, the maximum size of the office-cum-letter box room shall

be 20 m²

Business Buildings Provision shall be made for letter boxes on the entrance floor as per the requirements

of the postal department.

5.1.15 Meter Rooms

For all buildings above 15 m in height and in special occupancies, like educational, assembly,

institutional, industrial, storage, hazardous and mixed occupancies with any of the aforesaid occupancies

having area more than 500 m2 on each floor, provision shall be made for an independent and ventilated

meter (service) room, as per requirements of electric (service) supply undertakings on the ground floor

with direct access from outside for the purpose of termination of electric supply from the licensee’s service

and alternative supply cables. The door/doors provided for the service room shall have fire resistance of

not less than two hours.

5.1.16 Roofs

5.1.16.1

The roof of a building shall be so designed and constructed as to effectively drain water by

means of sufficient rain-water pipes of adequate size, wherever required, so arranged, jointed

and fixed as to ensure that the rainwater is carried away from the building without causing

dampness in any part of the walls, roof or foundations of the building or an adjacent building.

(1) The Local Authority may require rain-water pipes to be connected to a drain or sewer to a covered

channel formed beneath the public footpath to connect the rainwater pipe to the road gutter or in any

other approved manner.

(2) Rain-water pipes shall be affixed to the outside of the external walls of the building or in recesses or

chases cut or formed in such external walls or in such other manner as may be approved by the Local

Authority.

(3) It is desirable to conserve rainwater using suitable rain water harvesting techniques including by roof

water collection. In this context, reference may be made to Part 9 ‘Plumbing Services, Section 1 Water

Supply, Drainage and Sanitation (Including Solid Waste Management)’ of NBC, 2016.

5.2 Other general requirements

5.2.1

Swimming Pool

36

1) Definition: A constructed pool or a tank indoor or outdoor, used for the purpose of swimming, bathing,

aquatic sports or games, training, treatment (Therapy) or recreation, meant exclusively for human being,

having a depth of water not less than that 60 cm. and the surface area exceeding 23.25 Sq.m both for

the use of public or the institution concerned.

a. ‘Capacity of Pools in Relation to Bathers’: The maximum number of persons in bathing attire within the

pool enclosures of the bathing area shall not exceed one person per 20 Sft. (1.86 Sqm.) of pool i.e. the

area of the water surface.

2) ‘Hand Rail’: A side handrail extending up above and returning to the horizontal surface of the pool deck

curb or coping shall be provided at each side of each ladder.

3) ‘Depth Markers’: Depth of water shall be clearly marked at or above the water surface on the vertical

pool wall and on the edge of the deck or walk-way next to the pool, at maximum points and at the points

of break between the deep and shallow portions and at intermediate increments of depth, spaced at not

more than 2.5’ (7.62cm) intervals. Depth markers, contrasting with background shall be on both sides of

the pool.

4) ‘Lighting and wiring’: Where submarine lightning is used, not less than 0.5 watts shall be employed

per sq. ft. of pool area.

5) ‘Area Lightning’: Where submarine lightning is employed, area lightning shall be provided for the deck

areas and directed towards the deck areas and away from the pool surface so far as practicable, in a total

capacity of not less than 0.6 watt per Sft of deck area.

Where submarine lighting is not provided and night swimming is not permitted combined pool lightning

shall be provided in an amount of not less than 2 watts per Sft. of total area. All submarine lightning

shall be individually earthed and must be water tight and damp proof.

6) ‘Over Head wiring’: No electrical wiring for electrical or power shall be permitted to pass over within 20

feet of the pool enclosure.

7) ‘Shallow Minimum Depth’: Every swimming pool shall have a minimum depth in the shallow area of the

main swimming area of not less than 0.9 m (3 feet), but not more than 1.07m. (3’-6’) from the overflow

level to the floor.

8) ‘Shallow Areas’: In a swimming pool with a diving area, the shallow area of the pool shall be defined as

the portion between the shallow end and the break point between the shallow area and the diving area.

The slope of the floor shall be uniform from the break point between the diving area and the shallow

portion to the outside edge of the shallow portion and shall not be greater than 1 in 2 m.

9) ‘Vertical Wall Depth’: The pool walls shall be vertical at all points for a depth of not less than 0. 76 m.

5.2.2

Means of access

5.2.2.1 No Building shall be erected as to deprive any other building of its means of access.

5.2.2.2 Every person who erects a building shall not at any time erect or cause or permit to erect or re-

erect any building, which in any way encroaches upon or diminishes the area set apart as means

of access.

5.2.2.3 The Means of Access prescribed in the Zonal Regulations shall be considered while sanctioning

Building Licence. The portion of the building site required for widening the road to the proposed

width shall be relinquished free of cost without claiming any compensation (including DR), before

sanctioning Building Licence.

37

5.2.3

Staircase Requirements

5.2.3.1 The minimum clear width, minimum tread width and maximum riser of staircases for buildings

shall be as given as below (see also Part 4 ‘Fire and Life Safety of NBC 2016).

5.2.3.2 Minimum width

Table 5.2 The minimum width of staircase

5.2.3.3 Minimum tread

The minimum width of tread without nosing shall be 250 mm for residential buildings. The minimum

width of tread for other buildings shall be 300 mm.

5.2.3.4 Maximum riser

5.3.2.4.1

The maximum height of riser shall be 190 mm for residential buildings and 150 mm for other

buildings and these shall be limited to 12 per flight. The maximum height of riser shall be

190 mm for residential buildings and 150 mm for other buildings and these shall be limited

to 12 per flight.

5.3.2.4.2

The minimum head-room in a passage under the landing of a staircase shall be 2.1m. The

minimum clear head-room in any staircase shall be 2.1 m.

5.2.4

Exit Requirements

Exit Requirements All aspects of exit requirements for corridors, doors, staircases, ramps, etc, in respect

of widths, travel distance shall be as per Part 4 ‘Fire and Life Safety’ of the NBC Code-2016.

5.2.4.1 Occupant Load

The following occupant load shall be considered for calculating the exit requirement of the building

Table 5.3 Occupant Load

Sl. No.

Type of Occupancy

Occupant Load per

100 Sqm of Carpet

Area (in persons)

1

Residential

8.0

2

Educational

25.0

3

Institutional

6.60

4

Assembly

With fixed or loose seats and

dance floor without seating

facilities

including

dining

rooms

166.6

66.6

5

Mercantile

33.3

16.6

A

i) Residential buildings (dwellings)

ii) Apartment buildings

1.0m

1.25m

B

Hotel buildings/Lodging House

1.5m

C

Assembly buildings like auditoria, theatres

and cinemas

2.0m

D

Educational building

1.5m

E

Institutional buildings

2.0m

F

All other buildings

1.5m

38

Street

floor

and

sales

basement

Upper sale floor

6

Business and industrial

10.0

7

Storage

3.3

8

Hazardous

10.0

Note: 1. The occupant load in dormitory potions of homes for the aged, orphanages or mental hospitals etc.

where sleeping accommodation is provided shall be calculated at not less than 13.3 persons per 100 Sqm

2. In case of assembly occupancy, all rooms, toilets common areas connected to the assembly occupancy

shall be included in the carpet area for calculating the occupancy load.

5.2.4.2 Number and size of Exits

The requisite number and size of various exits shall be provided, based on the occupants in each room and

floor based on the occupant load, capacity of exits, travel distance and height of buildings as prescribed in

these Byelaws.

At least one primary entrance to each building shall be usable by individuals in wheelchairs and shall be

indicated by a sign. At least one entrance usable by individuals in wheelchairs shall be on a level that would

make the elevators accessible.

5.2.4.3 Arrangement of Exits

(1) Exits shall be so located so that the travel distance on the floor shall not exceed 30 m for residential,

educational, institutional assembly, business, mercantile and storage occupancies, 45.0m. for industrial

occupancy and 22.5m for hazardous building. For fully sprinklered building, the travel distance may be

increased by 50 percent of the above values. Whenever more than one exit is required for a floor of a building

they shall be placed as remote from each other as possible. All the exits shall be accessible from the entire

floor area at all floor levels, where separate fire separation walls are not provided.

(2) The travel distance to an exit from the dead end of the corridor, if applicable, shall not exceed half the

distance as stated above except in the case of institutional occupancy in which case it shall not exceed 6.0

m.

5.2.4.4 Capacity of Exits

The capacity of exits (staircase, ramps and doorways) indicating the number of persons that could be safely

evacuated through a unit exit width of 50 cm shall be as given below:

Table 5.4 Occupants per unit Exit width

Sl. No.

Group of Occupancy

Number of Occupants

Stairways

Ramps

Doors

1

Residential

25

50

75

2

Educational

25

50

75

3

Institutional

25

50

75

4

Assembly

40

50

60

39

5

Business

50

60

75

6

Mercantile

50

60

75

7

Industrial

50

60

75

8

Storage

50

60

75

9

Hazardous

25

30

40

5.2.4.5 Minimum Width Provisions for Passageway/Corridors

The following minimum width provisions shall be made for each passage way/corridor.

a)

Residential buildings, upto 4 dwelling units

1.00 m.

b)

Apartment buildings, hostels, etc.

1.25 m.

c)

Assembly buildings like auditorium theatres and cinemas

2.00 m.

d)

All other buildings including hotels

1.50 m.

e)

Hospital, Nursing Homes, etc.

2.40 m.

5.2.5

Ramps

(1) The ramp to basement and parking floors shall be as prescribed in the Zonal Regulations.

(2) Ramps may also be provided in the setbacks to function as fire drive cum ramp for basements, which can

be sloped considering unhindered movement of fire engine and in no case the gradient shall be steeper than

1 in 10 for Plains and steeper than 1 in 8 for Hilly areas.

(3) All structural design/safety aspects as per latest BIS Codes & NBC 2016 shall be complied along with

consideration of weight of Fire Engine & its manoeuvrings.

(4) The minimum width of the ramps in hospitals shall be 2.4 m for stretcher and not for vehicular movement.

(5) In this case Handrails shall be provided on both sides of the ramp.

(6) Ramps shall lead directly to outside open space at ground level or courtyards or safe place.

(7) No Portion of the Ramp shall project in to the road or drain outside the property.

(8) No Portion of gate shall open towards the roadside.

5.2.6

Doorways

(1) Every doorway shall open into an enclosed stairway, a horizontal exit, on a corridor or passageway

providing continuous and protected means of egress

(2) No exit doorways shall be less than 1m in width except assembly and institutional buildings where

Doorway shall not be less than 2 m.

40

(3) Exit doorways shall open outwards, that is away from the room but shall not obstruct the travel along

any exit. No door when opened shall reduce the required width of stairway or landing to less than 0.90 m

Overhead or sliding door shall not be installed.

Note: In the case of buildings where there is a central corridor, the doors of rooms shall open inwards to

permit smooth flow of traffic in the corridor

(4) Exit door shall not open immediately upon a flight of stairs. A landing equal to at least, the width of the

door shall be provided in the stairway at each doorway. Level of landings shall be the same as that of the

floor, which it serves.

(5) Exit doorways shall be open-able from the side, which they serve without the use of a key.

(6) Revolving doors shall not to be provided as means of fire exit.

(7) Mirrors shall not be placed in exit ways or exit doors to avoid confusion regarding the direction of exit.

5.2.7

Provision of exterior open spaces and height limitation around the building

5.2.7.1 The open spaces/setbacks, coverage, FAR, parking requirements shall be as per Zonal

regulations of the Master Plan

5.2.7.2 Every room that is intended for human habitation shall abut on an interior or exterior open

space or on to a verandah open to such interior or exterior open space. In case of High rise, the

driveway in exterior open spaces around a building shall be of or hard surface capable of taking

load of fire engine weighing up to 45 ton

5.2.7.3 In case, kitchen and toilets do not about either interior or exterior open spaces, mechanical

ventilation would be accepted.

5.2.8

Interior Open Space for Light and Ventilation

5.2.8.1 The whole or part of one side of one or more rooms intended for human habitation and not

abutting on either the front, rear or side open spaces shall abut on an interior open space whose

minimum width in all directions shall be 3m in case of buildings not more than 15m in height,

and in case of high-rise buildings it shall have mandatory mechanical ventilation in addition

5.2.8.2 Sunken Courtyard:

Sunken courtyard up to 3m in depth from the ground level as ‘light well’ within building envelop shall be

permitted for light and ventilation for basement area.

5.2.8.3 Skylight: Skylight in interior open space (courtyard) shall be permitted

5.2.9

Lighting and ventilation of rooms

5.2.9.1 IS Codes for lighting & ventilation requirements

Rooms shall have, for the admission of light and air, one or more openings, such as windows and

ventilators, opening directly to the external air or into an open VERANDAH.

41

Windows for all residential buildings shall be compulsorily provided with protective grills / railings (atleast

upto a height of 1.1 from the floor level) which shall be designed by keeping in mind the safety of children.

Lighting and ventilation requirements of all types of buildings shall be designed and approved in

accordance with the provisions of the following two IS Codes –

a. SP 32 (1986): Handbook on Functional Requirements of Industrial Buildings (Lighting and Ventilation)

[CED 12: Functional Requirements in Buildings] and

b. SP 41 (1987): Handbook on Functional Requirements of Buildings (Other than Industrial Buildings)

[CED 12: Functional Requirements in Buildings]

Lighting loads of various spaces of –

a. Industrial buildings shall be determined as per Clause 1, Section 1 of SP 32(1986)

b. Non-Industrial buildings shall be determined as per Clause 2, Part 4 of SP 41(1987)

Thermal comfort levels and design requirement of various spaces of –

a. Industrial buildings shall be determined as per Section 2 of SP 32 (1986)

b. Non-Industrial buildings shall be determined as per Part 2 of SP 41 (1987)

Minimum Fresh Air requirement for –

a. Industrial buildings shall be determined as per Clause 13 of Section 2 of SP 32(1986)

b. Non-Industrial buildings shall be determined as per Clause 4 of Part 3 of SP 41(1987)

5.2.9.2 The minimum aggregate area of openings

(1) The minimum aggregate area of such openings, excluding doors inclusive of frames, shall be not less than

one-sixth of the floor area. Openable part of French window shall be considered as openings for applying this

clause.

Notes:

i.

If a window is partly fixed, the openable area shall be counted

ii.

No portion of a room shall be assumed to be lighted, if it is more than 7.5 m away from the opening

assumed for lighting that portion.

iii. The area of openings as given above shall be increased by 25 percent in the case of a kitchen.

(2) All habitable rooms shall have for the admission of light and air, one or more apertures, such as window,

glazed door, opening directly to the external air or into an open verandah not more than 2.40 m. in width. In

case light and ventilation to habitable space area are through an internal courtyard, the minimum dimensions

of such courtyard shall not be less than 3.0 m. x 3.0 m. for buildings up to 12.50 m. in height. For buildings

with higher heights, the minimum dimensions of the internal courtyard shall be as given in these Byelaws.

(3) Where the lighting and ventilation requirements are not met through day lighting and natural ventilation,

the same shall be ensured through artificial lighting and mechanical ventilation as given in part-VII building

services Section-1 lighting and Ventilation of National Building Code of India published by the Bureau of

Indian Standards. The latest version of the National Building Code of India shall be taken into account at the

time of enforcement of the Building Byelaws.

42

5.2.9.3 Ventilation Shaft

For ventilating the spaces for water closets and bathrooms, if not opening on the front side, rear and

interior open spaces, shall open on the ventilation shaft, the size, of which shall not be less than the values

given below:

Table 5.5 Size of Ventilation Shaft

Height of Building

(m)

Size

of

ventilation

shaft (Sqm)

Minimum size of shaft

(m)

Up to 10.0

1.2

0.9

Up to 12.0

2.8

1.2

Up to 18.0

4.0

1.5

Up to 24.0

5.4

1.8

Up to 30.0

8.0

2.4

Above 30.0

9.0

3.0

Notes:

i. If mechanical ventilation system works in an uninterrupted manner is proposed to be installed in the building,

then ventilation shaft need not be insisted upon.

ii. For fully air-conditioned buildings the ventilation shaft need not be insisted upon, provided the air-conditioning

system works in an uninterrupted manner, also, provided there is an alternative source of power supply.

However, it is not mandatory in case of buildings where ventilation is mechanized

5.3

Building Services

5.3.1

Electrical, Air conditioning, Lift & Escalator installations

5.3.1.1 Planning, design and installations of electrical, air-conditioning and lift installations

The Planning design and installation of electrical installations, air conditioning installation of lifts and

escalators can be carried out in accordance with Part-VII Building Services, section–2 electrical installation,

section–3 air conditioning and heating, section-5 installation of lifts and escalators of National Building Code

of India. However, deviations from National Building Code may be done as per good Engineering practices.

Details to be considered for evaluating the Power Consumption for a Project is provided as Appendix-XIII

5.3.1.2 Number and types of lifts

(1) Lift shall have to be provided for buildings with more than ground plus three floors.

(2) The number and type of lifts to be provided in different buildings shall be as given in Appendix-XIVA.

5.3.1.3 Requirements of Electrical substation

The requirements of electric sub-station are given in Appendix-XIVB. The provision of electric sub-station

shall also require approval from Electricity Board concerned.

5.3.2

Plumbing and Sanitary Services

5.3.2.1 Planning, design, construction and installation of Water supply, drainage and sanitation and

gas supply system

43

The planning, design, construction and installation of water supply, drainage and sanitation and gas supply

system shall be in accordance with Part-9: Plumbing Services, Section-l Water supply, Drainage and

sanitation (including Solid Waste Management) and Section-2 Gas supply of NBC, 2016.

5.3.2.2 Norms for differently-abled within segregated toilets

i. One special W.C. in a set of toilets shall be provided for the use of differently abled persons, with

essential provision of wash basin near the entrance.

ii. Minimum clear opening of the door shall be 900 mm. and the door shall swing out.

ii. Minimum clear opening of the door shall be 900 mm. and the door shall swing out.

iii. Suitable arrangement of vertical/horizontal handrails with 50 mm. clearance from wall shall be made

in the toilet.

iv. The W.C. seat shall be 500 mm. from the floor.

5.3.2.3 Water requirement and facilities:

Water requirement for the facility may be worked out and enough storage for ½ day operation is to be kept in

storage. If municipal water supply is reliable, the toilet blocks may have underground sump that can store

half a day requirement and overhead tanks for another half. If municipal water supply is not available, toilet

block may have its own water source and pump with or without underground sump

Alternatively, a hand tube well can be used for storing water in an elevated (not overhead) tank. To minimize

the wastage of water, self-closing water taps should be used. The pans must be of Pour Flush (PF) design i.e.

with a steep slope. Traps should be of a 20-mm water seal. (Use of 50 mm water seal traps will require more

water for flushing.) If toilet is to be linked to city sewer, a master trap has to be provided at the sewer

connection for waste water line (excluding soil line).

Details to be considered for calculating Water Demand for buildings and Water Balance Chart is provided as

Appendix-XV

Table 5.6 Water Requirements for Various Occupancies / Uses (Ref. NBC 2016 Part 9, Section 1, Clause

4.1.1, 4.1.2 & Table 1)

Sl.

No.

Type of Building

Domestic

Per day

litre

Flushing

Per Day

litre

Total Consumption Per

Day litre

i)

Residences

a)

For communities with population up to

20,000

1)

Water supply through stand post

2)

Water

supply

through

house

service

connection (70 to 100 lphd)

40 lphd (Min)

100 lphd

b)

For communities with Population 20 000 to

100 000 (100 to 135 lphd)

95 lphd

45 lphd

135 lphd

c)

For communities with Population above 100

000 (150 to 200 lphd)

155 lphd

45 lphd

200 lphd

NOTE: The value of water supply given as 150 to 200

litre per head per day may be reduced to 135 lphd for

houses for Medium Income Group (MIG) and Lower

Income Groups (LIG) and Economically Weaker

Section (EWS), depending upon prevailing conditions

and availability of water.

44

ii)

Factories including canteen where bath rooms are

required to be provided

30

per

head

15 per

head

45 per head

iii)

Factories including canteen where no bath rooms are

required to be provided

20 per

head

10 per

head

30 per head

iv)

Hospital (excluding laundry and kitchen (see Note 2):

a) Number of beds not exceeding 100

230 per

head

110 per

head

340 per head

b) Number of beds exceeding 100

300 per

head

150 per

head

450 per head

c) Outpatient department (ODP)

10 per

head

5 per head

15 per head

v)

Nurses homes and medical quarters

90 per

head

45 per

head

135 per head

vi)

Hostels

90 per

head

45 per

head

135 per head

vii)

Hotel (up to 3 start) excluding laundry, kitchen, staff

and water bodies

120 per

head

60 per

head

180 per head

viii)

Hotel (4 star and above) excluding laundry, kitchen,

staff and water bodies.

260 per

head

60 per

head

320 per head

ix)

Offices (including canteen)

25 per

head

20 per

head

45 per head

x)

Restaurants

and

food

court

including

water

requirement for kitchen:

a) Restaurants

55 per

head

15 per

head

70 per head

b) Food court

25 per

head

10 per

head

35 per head

xi)

Clubhouse

25 per

head

20 Per

head

45 per head

xii)

Stadiums

4 per

head

6per head

10 per head

xiii)

Cinemas, Concert halls and theatres and multiplex

5 per

head

10 per

head

15 per head

xiv)

Schools/Educational institutions:

a) Without boarding facilities

25 per

head

20 per

head

45 per head

b) With boarding facilities

90 per

head

45 per

head

135 per head

xv)

Shopping and retail (mall)

a) Staff

25 per

head

20 per

head

45 per head

b) Visitors

5 per

head

10 per

head

15 per head

xvi)

Traffic terminal stations (see Notes 3 and 4)

a) Airports

40 per

head

30 Per

head

70 per head

b) Railway stations (Junctions) with bathing facility

40 per

head

30 per

head

70 per head

c) Railway stations (Junctions) without bathing facility

30 per

head

15 per

head

45 per head

d) Railway stations (Intermediate) with bathing facility

25per

head

20 per

head

45 per head

e) Railway stations (Intermediate) without bathing

facility

15 per

head

10 per

head

25 per head

f) Interstate bus terminals

25 per

head

20 per

head

45 per head

g) Interstate Bus Terminals/ Metro Stations

10 per

head

5 per head

15 per head

NOTES:

45

1. For Calculating water demand for visitors, consumption of 15 litre per head per day may be taken.

2. The Water demand includes requirement of patients, attendants, visitors and staff. Additional water

demand for kitchen, laundry and clinical water shall be computed as per actual requirements.

3. The number of persons shall be determined by average number of passengers handled by stations, with

due considerations given to the staff and vendors who are using these facilities.

4. Consideration should be given for seasonal average peak requirements.

5. The hospitals may be categorized as Category A (25 to 50 beds), Category B (51 to 100 beds), Category

C (101 to 300 beds), Category D (301 to 500) and Category E (501 to 750 beds).

Table 5.7 Water Storage Capacities (Ref. NBC 2016 Part 9, Section 1, Clause 4.4.10)

Sl.

No.

Description

Storage Capacity

1

In case only OHT is provided,

33.33 to 50 percent of one day’s requirement

2

In case only UGT is provided,

50 to 150 percent of one day’s requirement

3

In case combined storage is provided,

a)

For UGT

b)

For OHT

66.6 percent of one day’s requirement

33.3 percent of one day’s requirement

Table 5.8 Sanitation Requirements for Office Building

(Ref. NBC 2016 Part 9, Section 2, Clause 4.2.5.1, Table 1)

Sl.

No.

Fixtures

Public Toilets

Staff Toilets

Males

Females

Males

Females

(1)

(2)

(3)

(4)

(5)

(6)

Executive Rooms and Conference Halls in Office Buildings

(i) Toilet suite comprising one

WC, one washbasin(with

optional shower stall if

building is used round the

clock at user’s option)

Pantry optional as per

use requirement

Main Office Toilets for

Staff and Visitors

Unit could be Model for

male/female or separate

depending on the number of

user of each facility

For individual officer rooms

(ii) Water closets

See Note

1per25

1per15

(iii) Ablution tap with each

Water closet

1ineachwatercloset

(iv) Urinals

See Note

-

Nil up to

61for7to20

2 for21to45

3 for46to70

4 for71to100

From101to

200,add@3%

Forover200,

[email protected]%

-

(v) Washbasins

See Note

1per25

1per25

(vi) Drinking water fountain

See Note

1per100

1per100

(vii) Cleaner’s sink

1perfloor

NOTE: Staff and public toilet utilities are generally Model in office buildings. Where

public toilets are to be provided independently, similar requirements as that of staff

46

toilet may be provided.

Table 5.9 Sanitation Requirements for Factories

(Ref.NBC2016Part9,Section2,Clause4.2.5.1,Table2)

Sl.

No.

Fixtures

Offices/Visitors

Workers

Males

Females

Males

Females

(1)

(2)

(3)

(4)

(5)

(6)

(i)

Water

closets

(Workers and Staff

1forupto25

1forupto15

1forupto15

1forupto12

2for26to35

2for16to25

2for16to35

2for13to25

3for36to65

3for26to40

3for36to65

3for26to40

4for66to100

4for41to57

4for66to100

4for41to57

5for58to77

5for58to57

6for78to100

6for78to100

For persons 101–

200 add

3%

5%

3%

5%

For persons over

200add

2.5%

4%

2.50%

4%

(ii)

Ablution tap

1 in each water

closet

1 in each water

closet

1 in each water

closet

1 in each water closet

(iii)

Urinals

Nilupto6

-

Nilupto6

-

1for7to20

1for7to20

2for21to45

2for21to45

3for46to70

3for46to70

4for71to100

4for71to100

From

101

to

200,add

From

101

to

200,add

@3%

@3%

Sl.

No.

Fixtures

Offices/Visitors

Workers

Males

Females

Males

Females

(1)

(2)

(3)

(4)

(5)

(6)

47

Forover200,

Forover200,

[email protected]%

[email protected]%

(iv)

Wash basins

Wash basins

in

rows or troughs

andtapsspaced750

mmc/c

1 per 25 or part

thereof

1

per 25

or

part there of

1

per 25

or

part there of

1 per 25 or part

thereof

(v)

Drinking

water

fountain

1 per every 100 or part there of

With minimum one on each floor

1 per every 100 or part there of

With minimum one on each floor

(vi)

Cleaner’s sink

1 on each floor

1 on each floor

1 on each floor

1 on each floor

(vii)

Showers/bathing

rooms

As per trade requirements

(viii) Emergency shower

and

eye

wash

fountain

-

-

1 per every shop floor per 500 persons

NOTES:

1. For factories requiring workers to be engaged in dirty and dangerous operations or

requiring them to being extremely clean and sanitized conditions additional and

separate (if required so)toilet facilities and if required by applicable Industrial and

safety laws and the Factories Act shall be provided in consultation with the user.

2. Depending on the type of disability of a person and the hazard posed by the type

of activities in the factory for a person with disabilities, if a person with disabilities

is decided to be engaged for a particular activity, the requirements of accessibility

shall be guided by the provisions given in 13 of Part3 ‘Development Control Rules

and General Building Requirements’ of the Code.

Table 5.10 Sanitation Requirements for Cinema, Multiplex Cinema, Concert and Convention Halls,

Theatres and Stadia

(Ref. NBC 2016 Part 9, Section 2, Clause 4.2.5.1, Table 3)

Sl.

No.

Fixtures

Public

Staff

Males

Females

Males

Females

i)

Water Closets

1 per 100 up to

400 Over 400

add at 1 per 250

or part thereof

3 per 100 up to

200 Over 200

add at 2 per 100

or part thereof

1 for up to 15

1 for up to 12

2 for 16 to 35

2 for 13 to 25

ii)

Ablution tap

1 in each water closet

1 water tap with draining arrangements shall be provided for every 50

persons or part thereof in the vicinity of water closets and urinals

iii)

Urinals

----------

Nil up to 6

----------

48

1 per 25 or part

thereof

1 for 7 to 20

2 for 21 to 45

iv)

Wash basins

1 per 200 or part thereof

1 for up to 15

1 for up to 12

2 for 16 to 35

2 for 13 to 25

v)

Drinking water fountain

1 per every 100 or part thereof with minimum one on each floor

vi)

Cleaner's sink

1 per floor

vii)

Showers/bathing rooms

As per trade requirements

NOTES

1) Some WCs may be Indian Style, if desired.

2) Male population may be assumed as two-third and female population as one-third.

Table 5.11 Sanitation Requirements for Art Galleries, Libraries and Museums

(Ref. NBC 2016 Part 9, Section 2, Clause 4.2.5.1, Table 4)

Sl.

No.

Fixtures

Public

Staff

Males

Females

Males

Females

i)

Water Closets

1 per 200 up to

400 Over 400

add at 1 per

250 or part

thereof

1 per 100 up to

200 Over 200

add at 1 per

150 or part

thereof

1 for up to 15

1 for up to 12

2 for 16 to 35

2 for 13 to 25

ii)

Ablution tap

1 in each water closet

1 water tap with draining arrangements shall be provided for every 50

persons or part thereof in the vicinity of water closets and urinals

iii)

Urinals

1 per 50

----------

Nil up to 6

----------

1 for 7 to 20

2 for 21 to 45

iv)

Wash basins

1 for every 200

or part thereof.

For Over 400,

add at 1 per

250 or part

thereof

1 for every 200

or part thereof.

For Over 200,

add at 1 per

150 or part

thereof

1 for up to 15

1 for up to 12

2 for 16 to 35

2 for 13 to 25

v)

Drinking water fountain

1 per 100 persons or part thereof

vi)

Cleaner's sink

1 per floor (Minimum)

vii)

Showers/bathing rooms

As per trade requirements

NOTES

49

1) Some WCs may be Indian Style, if desired.

2) Male population may be assumed as two-third and female population as one-third.

Table 5.12 Sanitation Requirements for Hospitals with Indoor Patient Wards

(Ref. NBC 2016 Part 9, Section 2, Clause 4.2.5.1, Table 5)

Sl.

No

.

Fixtures

Patient

Staff

Males

Females

Males

Females

i)

Toilet suite comprising one WC and one

wash basin and shower stall

Private room with up to 4

patients

For individual

doctor's/officer's rooms

For General Wards, Hospital Staff and

Visitors

ii)

Water Closets

1 per 5 beds

or part

thereof

1 per 5 beds

or part

thereof

1 for up to 15

1 for up to 12

2 for 16 to 35

2 for 13 to 25

iii)

Ablution tap

1 in each water closet

1 water tap with draining arrangements shall be provided for

every 50 persons or part thereof in the vicinity of water closets

and urinals

iv)

Urinals

1 per 15 beds

----------

Nil up to 6

----------

1 for 7 to 20

2 for 21 to 45

v)

Wash basins

2 for every 30 beds or part

thereof. Add 1 per additional

30 beds or part thereof

1 for up to 15

1 for up to 12

2 for 16 to 35

2 for 13 to 25

vi)

Drinking water fountain

1 per ward

1 per 100 persons or part

thereof

50

vii)

Cleaner's sink

1 per ward

----------

viii

)

Bed pan sink

1 per ward

ix)

Kitchen sink

1 per ward

NOTES

1) Some WCs may be Indian Style, if desired.

2) Male population may be assumed as two-third and female population as one-third.

3) Provision for additional and special hospital fittings where required shall be made.

4) Drinking water fountains are not recommended for hospitals for reasons of infection control. This is to

be decided by the health authority recommendations.

Table 5.13 Sanitation Requirements for Hospitals with Outdoor Patient Department

(Ref. NBC 2016 Part 9, Section 2, Clause 4.2.5.1, Table 6)

Sl.

No.

Fixtures

Patient

Staff

Males

Females

Males

Females

i)

Toilet suite comprising one WC

and one wash basin (with

optional shower stall if building

used for 24 h)

For up to 4 patients

For individual doctor's/officer's

rooms

ii)

Water Closets

1 per 100

persons or part

thereof

2 per 100

persons or part

thereof

1 for up to 15

1 for up to 12

2 for 16 to 35

2 for 13 to 25

iii)

Ablution tap

1 in each water closet

1 water tap with draining arrangements shall be provided for every 50

persons or part thereof in the vicinity of water closets and urinals

iv)

Urinals

----------

Nil up to 6

----------

1 for 7 to 20

51

1 per 50

persons or part

thereof

2 for 21 to 45

v)

Wash basins

2 per 100

persons or part

thereof

2 per 100

persons or part

thereof

1 for up to 15

1 for up to 12

2 for 16 to 35

2 for 13 to 25

vi)

Drinking water fountain

See Note 2

1 per 100 persons or part thereof

NOTES

1) Some WCs may be Indian Style, if desired.

2) Drinking water fountains are not recommended for hospitals for reasons of infection control. This is to

be decided by the health authority recommendation.

3) The WCs shall be provided keeping in view the location of main OPD waiting hall and sub-waiting

halls, floor wise, so as to serve the people effectively. The number of patients shall be calculated floor

wise. The OPD population shall include patient attendants @ at least 1 per patient.

4) Male population may be assumed as two-third and female population as one-third.

5) Provision for additional and special hospital fittings where required shall be made.

Table 5.14 Sanitation Requirements for Hospitals, administrative Buildings

(Ref. NBC 2016 Part 9, Section 2, Clause 4.2.5.1, Table 7)

Sl. No.

Fixtures

Staff Toilets

Males

Females

i)

Toilet suite comprising one WC, one urinal and

one wash basin (with optional shower stall if

building is used for 24 h)

For individual doctor's/officer's rooms

ii)

Water Closets

1 per 25

1 per 15

iii)

Ablution tap

1 in each water closet

1 water tap with draining arrangements shall be

provided for every 50 persons or part thereof in

the vicinity of water closets and urinals

iv)

Urinals

1 for 6 to 15

----------

2 for 16 to 50

v)

Wash basins

1 per 25

1 per 25

vi)

Drinking water fountain (See Note 2)

1 per 100

1 per 100

vii)

Cleaner's sink

1 per floor, minimum

viii)

Kitchen sink

1 per floor, minimum

NOTES

1) Some WCs may be Indian Style, if desired.

2) Drinking water fountains to be provided only when it is a separate block and patients will not use

it.

52

Table 5.15 Sanitation Requirements for Hospitals Staff Quarters and Nurses Homes

(Ref.NBC2016Part9, Section2, Clause4.2.5.1, Table8)

Sl.

No

Fixtures

Staff Quarters

Nurses

(1)

(2)

Males

Females

Males

Females

(3)

(4)

(5)

(6)

(i)

Water closets

1 per 4

persons or

part thereof

1 per 4 persons

or part thereof

1 per 4 persons

or part there of

2

For 5to35

1 per 4 persons

or part there of

2

For 5 to 35

(ii)

Ablution tap

One in each

Water closet

One in each

Water closet

One in each

Water closet

One in each

Water closet

I water tap with draining arrangements shall be provided for every 50

persons or part there of in the vicinity of water closets and

urinals.

(iii)

Washbasins

1per 8 persons or part thereof

1per 8 persons or part thereof

(iv)

Bath(show

ers)

1per4 persons or part there of

1per4 persons or part there of

(v)

Drinking

Water fountain

1 per 100 persons or part

Thereof,Min1 per floor

1 per100 persons or part

Thereof,Min1 per floor

(vi)

Cleaner’s sink

1per floor

1per floor

NOTES:

(1) Some WCs may be Indian style, if desired

(2) For independent housing units, fixtures shall be provided as for residences

53

Table 5.16 Sanitation Requirements for Hotels

(Ref.NBC2016Part9,Section2,Clause4.2.5.1,Table9)

Sl.No

Fixtures

Public Rooms

Non-Residential staff

(1)

(2)

Males

Females

Males

Females

(3)

(4)

(5)

(6)

(i)

Toilet suite

comprising one

WC wash basin

with shower or

A bathtub

Individual guestrooms with

attached toilets

-

(ii)

Water closets

1per100persons

upto400

Over400addat1per25

0orpartthereof

2per100person

sup to200

Over200add

at1per100

or part

thereof

1 forupto15

2 for16to35

3 for36to65

4 for66to100

1 forupto12

2 for13to25

3 for26to40

4 for41to57

5 for58to77

6 for78to100

(iii)

Ablution tap

One in each water

closet

One in each

Water closet

One in each

Water closet

One in each

Water closet

I water tap with draining arrangements shall be provided for every 50 persons or

part there of in the vicinity of water closets and

urinals.

(iv)

Urinals

1per50 persons or

part thereof

-

Nil upto

61for7to20

2 for21to45

3 for46to70

4 for71to100

-

(v)

Washbasins

1perWC/Urinal

1perWC

1 for upto15

(vi)

Bath(showers)

1per10 persons or part there of

-

-

(vii)

Cleaner’s sink

1per 30rooms, Min1per floor

54

(viii)

Kitchen sink

1perKitchen

NOTES:

(1) Some WCs may be Indian style,if desired

(2) Male population may be assumed as two-third and female populations one-third.

(3) Provision for additional and special fitting where required shall be made.

Table 5.17 Sanitation Requirements for Restaurants

(Ref. NBC 2016 Part 9, Section 2, Clause 4.2.5.1, Table 10)

Sl.

No.

Fixtures

Public Rooms

Non Residential Staff

Males

Females

Males

Females

i)

Water Closets

1 per 50 seats

up

to

200.

Over 200 add

at 1 per 100 or

part thereof

2 per 50 seats

up

to

200.

Over 200 add

at 1 per 100 or

part thereof

1 for up to 15

1 for up to 12

2 for 16 to 35

2 for 13 to 25

3 for 36 to 65

3 for 26 to 40

4 for 66 to 100

4 for 41 to 57

5 for 58 to 77

6 for 78 to 100

ii)

Ablution tap

1 in each water closet

1 water tap with draining arrangements shall be provided for every

50 persons or part thereof in the vicinity of water closets and urinals

iii)

Urinals

1

per

50

persons or part

thereof

----------

Nil up to 6

----------

----------

1 for 7 to 20

----------

----------

2 for 21 to 45

----------

----------

3 for 46 to 70

----------

----------

4 for 71 to 100

----------

iv)

Wash basins

1 per WC

1 per WC

1 per WC

1 per WC

v)

Cleaner's sink

1 per each restaurant

vi)

Kitchen sink/dish washer

1 per Kitchen

NOTES

1) Some WCs may be Indian Style, if desired.

2) Male population may be assumed as two-third and female population as one-third.

3) Provision for additional and special hospital fittings where required shall be made.

55

Table 5.18 Sanitation Requirements for Schools and Educational Institutions

(Ref. NBC 2016 Part 9, Section 2, Clause 4.2.5.1, Table 11)

Sl.

No.

Fixtures

Nursery

School

Non Residential

Residential

Boys

Girls

Boys

Girls

i)

Water Closets

1 per 15

pupils or

part thereof

1 per 40

pupils or

part thereof

1 per 25

pupils or

part thereof

1 per 8

pupils or

part thereof

1 per 6

pupils or

part thereof

ii)

Ablution tap

1 in each

WC

1 in each

WC

1 in each

WC

1 in each

WC

1 in each

WC

1 water tap with draining arrangements shall be provided for every 50

persons or part thereof in the vicinity of water closets and urinals

iii)

Urinals

----------

1 per 20

pupils or

part thereof

----------

1 per 25

pupils or

part thereof

----------

iv)

Wash basins

1 per 15

pupils or

part thereof

1 per 60

pupils or

part thereof

1 per 40

pupils or

part thereof

1 per 8

pupils or

part thereof

1 per 6

pupils or

part thereof

v)

Bath (showers)

1 per 40

pupils or

part thereof

----------

----------

1 per 8

pupils or

part thereof

1 per 6

pupils or

part thereof

vi)

Drinking water fountain

or taps

1 per 50

pupils or

part thereof

1 per 50

pupils or

part thereof

1 per 50

pupils or

part thereof

1 per 50

pupils or

part thereof

1 per 50

pupils or

part thereof

vii)

Cleaner's sink

1 per each floor

NOTES

1) Some WCs may be Indian Style, if desired.

2) For teaching staff, the schedule of fixtures to be provided shall be the same as in case of office

building.

56

Table 5.19 Sanitation Requirements for Hostels

(Ref. NBC 2016 Part 9, Section 2, Clause 4.2.5.1, Table 12)

Sl.

No.

Fixtures

Resident

Non Resident

Visitor/ Common

Rooms

Males

Females

Males

Females

Males

Females

i)

Water Closets

1 per 8 or

part

thereof

1 per 6 or

part

thereof

1 for up to

15

1 for up to

12

1 per 100

up to 400

2 per 100

up to 200

2 for 16 to

35

2 for 13 to

25

Over 400

add at 1

per 250

Over 200

add at 1

per 100

3 for 36 to

65

3 for 26 to

40

4 for 66 to

100

4 for 41 to

57

5 for 58 to

77

6 for 78 to

100

ii)

Ablution tap

1 in each water closet

1 water tap with draining arrangements shall be provided for every 50 persons

or part thereof in the vicinity of water closets and urinals

iii)

Urinals

1 per 25 or

part

thereof

----------

Nil up to 6

----------

1 per 50 or

part

thereof

----------

----------

1 for 7 to

20

----------

----------

----------

2 for 21 to

45

----------

----------

----------

3 for 46 to

70

----------

----------

----------

4 for 71 to

100

----------

----------

iv)

Wash basins

1 per 8 or

part

thereof

1 per 6 or

part

thereof

1 for up to

15

1 for up to

12

1 per WC/

Urinal

1 per WC

2 for 16 to

35

2 for 13 to

25

3 for 36 to

65

3 for 26 to

40

4 for 66 to

100

4 for 41 to

57

5 for 58 to

77

6 for 78 to

100

v)

Bath/showers

1 per 8 or

part

thereof

1 per 6 or

part

thereof

----------

----------

----------

----------

vi)

Cleaner's sink

1 per each floor

NOTES - Some WCs may be Indian Style, if desired.

57

Table 5.20 Sanitation Requirements for Fruit and Vegetable Markets

(Ref.NBC2016Part9,Section2,Clause4.2.5.1,Table13)

Sl.

No.

Fixtures

ShopOwners

CommonToiletsMarket

Building

PublicToiletfor

FloatingPopulation

Males

Females

Males

Females

Males

Females

(1)

(2)

(3)

(4)

(5)

(6)

(7)

(8)

i)

Water

Closets

1per8orpartth

ereof

1 forupto15

2 for16to35

3 for36to65

4 for66to

100

1 forupto12

2 for13to25

3 for26to40

4 for41to57

5 for58to77

6 for78to100

1per50

(Min2)

1per50

(Min2)

ii)

Ablution

tap

One in

each

water

closet

One in

each

water

closet

One in each

water closet

One in each

water closet

One in each

water closet

One in each

water

closet

1 Water tap with draining arrangements shall be provided in receiving/ sale area of

each shop and for every 50 persons or part thereof in the vicinity of water

Closets and urinals

iii)

Urinals

-

-

Nil up to

61for7to20

2 for21to45

3 for46to70

4 for71to

100

-

1per50

-

iv)

Wash

basins

1per8orpartth

ereof

1 forupto15

2 for16to35

3 for36to65

4 for66to

100

1 forupto12

2 for13to25

3 for26to40

4 for41to57

-

-

v)

Bath/show

ers

1 per8

persons

or part

thereof

1

per6per

sons or

part

thereof

-

-

1per50

persons

1per50

persons

NOTE-

1)

Toilet facilities for individual buildings in a market should be taken same as that for office

buildings.

2)

Common toilets in the market buildings provide facilities for persons working in shops and the

irregular visitors.

3)

Special toilet facilities for a large floating population of out of town

buyers/sellers,labourers,drivers of vehicles for whom special toilet(public toilets).

58

Table 5.21 Sanitation Requirements for Bus Stations, Airports and Railway Stations

(Ref. NBC 2016 Part 9, Section 2, Clause 4.2.5.1, Table 14)

Sl.

No.

Fixtures

Junction Stations,

Intermediate Stations

and Bus Stations

Terminal Railway and

Bus Stations

Domestic and

International Airports

Males

Females

Males

Females

Males

Females

i)

Water Closets

3 for up to

1000

4 for up to

1000

4 for up to

1000

5 for up to

1000

Min 2

Min 2

Add 1 per

additional

1000 or

part

thereof

Add 1 per additional

1000 or part thereof

For 200 :

5

For 200 :

8

For 400 :

9

For 400 :

15

For 600 :

12

For 600 :

20

For 800 :

16

For 800 :

26

For 1000 :

18

For 1000 :

29

ii)

Ablution tap

1 in each water closet

1 water tap with draining arrangements shall be provided for every 50 persons or

part thereof in the vicinity of water closets and urinals

iii)

Urinals

4 for up to

1000

----------

6 for up to

1000

----------

1 per 40 or

part

thereof

----------

Add 1 per

additional

1000 or

part

thereof

----------

Add 1 per

additional

1000 or

part

thereof

----------

----------

iv)

Wash basins

1 per WC/

Urinal

1 per WC

1 per WC/

Urinal

1 per WC

1 per WC/

Urinal

1 per WC

v)

Bath/showers

2 per 1000

3 per 1000

4 per 1000

vi)

Drinking water

fountain or taps (in

common lobby for M/F)

2 per 1000 or part

thereof

3 per 1000 or part

thereof

4 per 1000 or part

thereof

vii)

Cleaner's sink

1 per toilet compartment with 3 WCs

NOTES

1) Some WCs may be Indian style, if desired.

2) Male population may be assumed as three-fifth and female population as two-fifth.

3) Separate provision shall be made for staff and workers.

59

Table 5.22 Sanitation Requirements for Shopping Mall and Retail Buildings

(Ref. NBC 2016 Part 9, Section 2, Clause 4.2.5.1, Table 15)

Sl.

No.

Fixtures

Staff

Toilets

in

Shopping

Building

Public

Toilet

for

Floating

Population

Males

Females

Males

Females

i)

Water Closets

1 for up to 15

1 for up to 12

1 per 50 (Min 2)

1 per 50 (Min 2)

2 for 16 to 35

2 for 13 to 25

3 for 36 to 65

3 for 26 to 40

4 for 66 to 100

4 for 41 to 57

5 for 58 to 77

6 for 78 to 100

ii)

Ablution tap

1 in each water closet

iii)

Urinals

Nil up to 6

----------

1 per 50

----------

1 for 7 to 20

2 for 21 to 45

3 for 46 to 70

4 for 71 to 100

iv)

Wash basins

1 for up to 15

1 for up to 12

1 per 50 (Min 2)

1 per 50 (Min 2)

2 for 16 to 35

2 for 13 to 25

3 for 36 to 65

3 for 26 to 40

4 for 66 to 100

4 for 41 to 57

v)

Bath/showers

1 per 100 persons

----------

----------

NOTES

1) Toilet facilities for individual facilities in a shopping building should be taken same as that for office

buildings.

2) Staff toilets in the shopping buildings provide facilities for persons working in shops and building, as

well as for maintenance staff.

3) The number of persons against the fixture bath/showers represent the maintenance staff requiring

such facility.

4) Public toilet facilities are provided for a large floating population for buyers and visitors.

60

5.3.2.4 Construction Site

1.At construction sites, one toilet must be provided per 20 employees. In a work zone with between 21 and

199 employees, a toilet seat and one urinal must be provided for every 40 employees. For 200 or more workers,

regulations call for a toilet seat and a urinal per 50 workers. The toilet must be located within 200 m or 5-

minute walk.

2. Job sites that are not equipped with a sanitary sewer must, unless prohibited by local codes, provide

privies, in locations where their use will not contaminate either ground or surface water. Other alternatives

to a privy could be chemical toilets, re-circulating toilets, or combustion toilets.

3. Toilets should be cleaned regularly and maintained in good order, running water, must be provided along

with soap and individual hand towels.

5.3.2.5 Temporary Camp Toilets

Toilet facilities shall be provided within 60 m of the, site, which shall not be closer than 15 m of dining area

or kitchen. Make sure that toilet area is cleaned at least once per day, it is sanitary, adequately lighted and

is employee safe.

5.3.2.6 Special / Contingency Toilets

1) For Special events like open air theatre, religious/political gatherings, mela, etc. for which there are no

permanent toilet facilities, contingency toilets/PSUs shall be provided. The following considerations shall

determine the number of toilets to be provided for particular event:

a) Duration of the event

b) Type of crowd

c) Weather conditions

d) Whether finishing times are staggered if the event has multi-functions and the following guidelines shall

be applied with minimum 50 per cent female toilets.

61

Table 5.23 Contingency Toilets facilities for Special Events

Sl.No.

Patrons

For Males

For Females

Toilets

Urinals

Sinks

Toilets

Sinks

1

<500

1

2

2

6

2

2

<1000

2

4

4

9

4

3

<2000

4

8

6

12

6

4

<3000

6

15

10

18

10

5

<5000

8

25

17

30

17

3)

Special Purpose Toilets: Special toilet facilities shall be adequately provided in public projects

(transport terminals/ healthcare and other public spaces) in million plus cities for the Third gender with

appropriate cleanliness arrangements.

5.3.2.7 General guidance for water supply arrangements

1. For new construction: Provision shall be made for underground tank for the storage of water, having

capacity at 200 l. per person with adequate pumping arrangements to supply water to upper floors. Water

connection from the Water Supply system of the Authority will be allowed only for use of drinking and bathing.

For other purposes i.e. flushing and gardening etc., the individual shall be required to have own arrangements

of open well, tube well (with the permission of Ground Water Authority), rain water or recycled water, within

the premises. While according sanction to Layout Plan, the Authority shall make a special mention that

provision for space shall be kept for the construction of underground reservoir of adequate capacity along

with booster pumping station

2.The plumbing arrangement in case of new constructions shall be made in a way that the potable water shall

be used for drinking, cooking & bathing only and for rest of the uses, provision for dual piping system shall

be made for the buildings specified in chapter 11.

3. Low-capacity cistern should preferably be provided instead of normal 12.5 L capacity.

4. Provisions for sustainable methods of Water and Wastewater management and Water harvesting may be

referred from Chapter 10 and Chapter 11 of these Byelaws.

5.3.2.8 Provision for Closed Circuit Camera System

All buildings above 500 sqm. shall provide minimum two numbers of High-Definition Closed Circuit Cameras

facing the road and connected to compatible DVRs with recording facility of at least one week.

62

CHAPTER 6

6. PROVISIONS FOR HIGH RISE DEVELOPMENT

6.1 General

These provisions shall be in addition to the Chapter 4 for plan sanction procedure, general building

requirements (low/high) given in Chapter 5 of this document and structural safety given in Chapter7

6.2 Means of access: Shall be as specified in the Zonal Regulations

6.3 Parking Spaces

(1) The parking spaces shall be provided as per the provisions of Master Plan and Zonal Regulations as

prevalent. The location of parking spaces shall be well ventilated.

(2) In case of high-rise buildings parking will be permitted at any/all of the following:

a. Basements

b. Stilt floor

c. Stacked/ Multi-level/ Automated parking

6.4 Building components

6.4.1

Doorways

The doorway requirements shall be as prescribed in Clause no.5.2.6

6.4.2

Revolving Doors

Revolving door shall not be provided as a means of fire exit

6.4.3

Stairways

The internal staircases may be constructed with an external wall, or otherwise, and shall comply with the

following:

(1)A staircase shall not be arranged round a lift shaft.

The natural ventilation requirement of the staircase shall be, achieved through opening at each landing, of

an area 0.5 m² in the external wall. A cross ventilated staircase shall have 2 such openings in

opposite/adjacent walls or the same shall be cross ventilated through the corridor.

Enclosed staircase leading to more than one basement shall be pressurized.

The pressure difference for staircases shall be 50 Pa. For pressurized stair enclosure systems, the activation

of the systems shall be initiated by signalling from fire alarm panel.

The minimum width of tread without nosing shall be 250 mm for staircase of residential buildings. This shall

be minimum 300 mm for assembly, hotels, educational, institutional, business and other buildings. The

treads shall be constructed and maintained in a manner to prevent slipping. The maximum height of riser

shall be 190 mm for staircase of residential buildings(A-2) and 150 mm for other buildings. The number of

risers shall be limited to 12 per flight.

63

Handrails, to be provided on both sides, shall be of a height not less than 1 000 mm and not exceeding 1 200

mm. There shall be provisions of balusters with maximum gap of 150 mm

Access to exit staircase shall be through a fire door of a minimum 120 min fire resistance rating.

No living space, store or other fire risk shall open directly into staircases.

(2) The minimum width of staircase shall be as per Zonal regulations:

(3) Handrails shall be provided with a minimum height of 1.0 m from the center of the tread.

(4) Access to main staircase shall be gained through adequate fire resistance rating specified in Chapter12

Automatic closing doors shall be placed in the enclosing walls of the staircases. It shall be a swing type door

opening in the direction of the escape.

(5). No living space, store or other fire risk shall open directly into the staircase or staircases.

(6). External exit door of staircase enclosure at ground level shall open directly to the open spaces or can be

reached without passing through any door other than a door provided to form a draught lobby

(7). The exit sign with arrow indicating the way to the escape route shall be provided at a height of 0.5m from

the floor level on the wall and shall be illuminated by electric light connected to corridor circuits. All exit way

marking signs should be flushed with the wall and so designed that no mechanical damage shall occur to

them due to moving of furniture or other heavy equipment. Further all landings of floor shall have floor

indication boards indicating the number of floor. The floor indication board shall be placed on the wall

immediately facing the flight of stairs and nearest to the landing. It shall be of size not less than 0.5x 0.5m

and it shall be prominently on the wall facing the staircase.

(8). In case of single staircase, it shall terminate at the ground floor level and the access to the basement shall

be by a separate staircase. However, the second staircase may lead to basement levels provided the same is

separated at ground level by either a ventilated lobby with discharge points at two different ends or through

enclosures with fire resistance rating door specified in Chapter12 or through a fire protected corridor.

6.4.4

Lifts

General requirements of lifts shall be as follows:

(1) All the floors shall be accessible for 24 hours by the lifts. The lifts provided in the buildings shall not be

considered as a means of escape in case of emergency. In a dual line arrangement (lifts opposite to each other)

the lobby may be between 1.5 times to 2.5 times the depth of one car. For in-line (single line) arrangements

the lobby may be typically half of the above recommendations.

(2) Grounding switch, at ground floor level, to enable the fire service to ground the lift shall also be provided.

(3) The lift machine room shall be separate and no other machinery shall be installed therein.

(4) Walls of lift enclosures and lift lobby shall have fire rating of 2 hour; as specified in Chapter12 lifts shall

have a vent at the top of area not less than 0.2 Sqm

(5) Lift car door shall have a fire resistance rating of 1 hour.

(6) Lift lobby doors in lift enclosures shall have fire resistance as specified in Chapter12.

(7) Collapsible gates shall not be permitted for lifts and shall have solid doors with fire resistance of at least

1 hour.

64

(8) If the fire man lift shaft and lobby is in the core of the building, a positive pressure between 25 and 30 Pa

shall be maintained in the lobby and a positive pressure of 50 Pa shall be maintained in the lift shaft. The

mechanism for pressurization shall act automatically with the fire alarm; it shall be possible to operate this

mechanically also.

(9) Lifts if communicating with the basement, the lift lobby of the basements shall be pressurized as suggested

in clause 12.9.1(g) and 12.9.1(h) with self-closing door with fire resistance rating as specified in Chapter 12.

Telephone or other communication facilities shall be provided in lift cars and to be connected to fire control

room for the building.

(10) Exit from the fire man lift lobby, if located in the core of the building, shall be through a self-closing fire

door of half an hour fire resistance.

(11) Suitable arrangements such as providing slope in the floor of lift lobby shall be made to prevent water

used during firefighting, etc., at any landing from entering the lift shafts.

(12) A sign shall be posted and maintained on every floor at or near the lift indicating that in case of fire,

occupants shall use the stairs unless instructed otherwise. The sign shall also contain a plan for each floor

showing the locations of the stairways. Alternate source of power supply shall be provided for all the lifts

through a manually operated changeover switch.

(13) For Pressurization Specifications of various building components refer NBC Chapter 4 Fire and Life Safety

Pressurization of Staircases (Protected Escape Routes)

In case of High-rise buildings, “Clause-7:7.1 Fire Protection Requirements of Lifts in High Rise Buildings of

section 5 installation of lifts, escalators and Moving walks: 5A lifts”of part 8 of NBC-2016 shall be applicable

with respect to the fire ratings and other installation provisions.

6.4.5

Basements

6.4.5.1 General requirements

Basement floors shall be permitted as prescribed in the Zonal Regulations

6.4.5.2 Requirements for High rise development

(1) Each basement shall be separately ventilated. Vents with cross-sectional area (aggregate) not less than

2.5 percent of the floor area spread evenly round the perimeter of the basement shall be provided in

the form of grills or breakable stall board lights or pavement lights or by way of shafts. Alternatively,

a system of air inlets shall be provided at basement floor level and smoke outlets at basement ceiling

level. Inlets and extracts may be terminated at ground level with stall board or pavement lights, but

ducts to convey fresh air to the basement floor level have to be laid. Stall board and pavement lights

should be in positions easily accessible to the fire brigade and clearly marked ‘SMOKE OUTLET’ or

‘AIR INLET’ with an indication of area served at or near the opening

(2) The staircase of basements shall be of enclosed type having fire resistance rating as specified in Chapter

12. The staircase shall be situated at the periphery of the basement to be entered at ground level only,

from outside open air. The staircase shall communicate with basement through a lobby with self-closing

doors with fire resistance rating as per relevant NBC code mentioned above.

(3) In multi-storey basements, intake ducts may serve all basement levels, but each basement level and

basement compartment shall have separate smoke outlet duct or ducts. Ducts so provided shall have the

same fire resistance rating as the compartment itself. Fire rating may be taken as the required smoke

extraction time for smoke extraction ducts.For multistoried basements, clause 11.5 of Section -3: Air

Conditioning, Heating and Mechanical Ventilation of part 8- Building Services is applicable.

65

(4) Mechanical extractors for smoke venting system from lower basement levels shall also be provided. The

system shall be of such design as to operate on actuation of heat / smoke sensitive detectors or sprinklers,

if installed, and shall have a considerably superior performance compared to the standard units. It shall

also have an arrangement to start it manually.

(5) Mechanical extractors shall have an internal locking arrangement, so that extractors shall continue to

operate and supply fans for HVAC shall stop automatically with the actuation of fire detectors.

(6) Mechanical extractors shall be designated to permit 30 air changes per hour in case of fire or distress

call. However, for normal operation, air changes schedule shall be as given in Part 8, Building Services,

Section 3, Air-conditioning, Heating and Mechanical Ventilation of National Building Code, 2016.

(7) Mechanical extractors shall have an alternative source of supply.

h. Ventilating ducts shall be integrated with the structure and made out of brick masonry or reinforced

cement concrete and when this duct crosses the transformer area or electrical switchboard, fire dampers

shall be provided.

(8) Use of basements for kitchens working on gas fuel shall not be permitted, unless air conditioned. The

basement shall not be permitted below the ward block of a hospital/nursing home unless it is fully

sprinkled. Building services such as electrical sub-stations, boiler rooms in basements shall comply with

the provisions of the Indian Electricity Act / Rules. Boiler room shall be provided at the first basement

along the periphery wall with fire resistance rating as specified in Chapter 12 or shall be separated with

the blast wall.

(9) If cut-outs are provided from basements to the upper floors or to the atmospheres, all sides’ cut-out

openings in the basements shall be protected by sprinkler head at close spacing so as to form a water

curtain in the event of a fire.

(10) It is essential to make provisions for drainage of any such water on all floors to prevent or minimize

water damage of the contents. The drain pipes should be provided on the external wall for drainage of

water from all floors. On large area floors, several such pipes may be necessary which should be spaced

30 m apart. Care shall be taken to ensure that the construction of the drain pipe does not allow spread

fire / smoke from floor to floor.

6.4.6

Compartmentation

The building shall be suitably compartmentalized so that fire/smoke remains confined to the area where fire

incident has occurred and does not spread to the remaining part of the building. Compartmentation and

Pressurization method shall be adopted (as per Part 4 of NBC2016) to protect escape routes against ingress

of smoke, or toxic gases into the escape routes will be prevented. Pressurization shall be adopted for high rise

buildings and building having mixed occupancy/multiplexes having covered area more than 500 Sqm.

Compartmentation in high rise building should be followed as per NBC 2016.

6.4.7

Ramps

Ramps shall be provided as prescribed in Clause 5.2.5

66

6.4.8

Corridors

(1) Exit corridors and passageways shall be of width not less than the aggregate required width of exit

doorways leading from them in the direction of travel to the exterior.

(2) The width of the corridor shall be as specified in the Zonal Regulations.

(3) Where stairways discharge through corridors and passageways, the height of corridors and passageways

shall be not less than 2.4 m.

(4) All means of exit including staircases lifts lobbies and corridors shall be ventilated.

6.4.9

Glass Façade/ Service Ducts/Shafts/ Refuge Area/ Vents

(1) An Opening to the glass façade of min. width 1.5 m and height 1.5m shall be provided at every floor

at a level of 1.2 m from the flooring facing compulsory open space as well as on road side.

Construction that complies with the fire rating of the horizontal segregation and has any gap packed

with a non-combustible material to withstand thermal expansion and structural movement of the

walling without the loss of seal against fire and smoke.

(2) (2) Mechanism of Opening: The openable glass panel shall be either left or right shall have manual

opening mechanism from inside as well as outside. Such openable panels shall be marked

conspicuously so as to easily identify the openable panel from outside.

(3) Fire seal to be provided at every floor level between the external glazing and building structure.

(4) The glazing used for the façade shall be of toughened (tempered) safety glass as per I.S.2553.

(5) To avoid fire propagation vertically from one floor to another floor, a continuous glass I must be

separated internally by a smoke/ fire seal which is of non-combustible material having a fire

resistance rating of not less than 2 hours.

(6) Service ducts and shafts shall be enclosed by walls and doors with fire resistance rating (Refer Clause

12.7.1 of Chapter 12). All such ducts/shafts shall be properly sealed and stopped fire ingress at all

floor levels.

(7) A vent opening at the top of the service shaft shall be provided having an area between one- fourth

and one-half of the area of the shaft.

(8) The openable vent of minimum 2.5% of the floor area shall be provided. The openable vent can be

pop out type or bottom hinged provided with fusible link opening mechanism and shall also be

integrated with automatic Smoke Detection System.

a) Alternate vertical glass panels of the façade shall be openable type with the mechanism mentioned

above in order to ventilate the smoke.

b) Refuge areas covered with the glass façade shall have all the panels fully openable (either left or right

hinged) both from inside as well as outside. Glass quality and Practice of use of Glass in buildings shall have

to be in conformity with the BIS codes as given in Table 5.1 below:

IS Code

Specifications

2553(Part 1):1990

Specification for safety glass: Part 1 General purpose (third

revision)

2835:1987

Specification for flat transparent sheet glass (third revision)

438:1994

Specification for silvered glass mirrors for general purpose

(second revision)

67

5437:1994

Specification for figured rolled and wired glass (first revision).

14900:2000

Specification for transparent float glass.

16231 Part 1

General methodology for selection

16231 Part 2

Energy and Light

16231 Part 3

Fire and Loading

16231 Part 4

Safety related to Human Impact

Clause 3.4.8.2.2, clause 3.4.10.2 and E-4”Horizontal Exits /Refuge Area”of Annexure E; Additional

Requirements for High Rise Buildings of Part-4 of NBC 2016 are applicable.

6.5 Building Services

6.5.1

Staircase and Corridor Lighting

(1) The staircase and corridor lighting shall be on separate service and shall be independently connected

so as it could be operated by one switch installation on the ground floor, easily accessible to

firefighting staff at any time irrespective of the position of the individuate control of the light points,

if any.

(2) Staircase and corridor lighting shall also be connected to alternate supply from parallel high-tension

supply or to the supply from the stand-by generator.

(3) Emergency lights shall be provided in staircase and corridor/ passageway, horizontal exits, refuge

area; and all wires and other accessories used for emergency light shall have fire retardant property

Clause 2.13: Emergency and lighting system; Clause 3.4.6.2 Emergency power for fire and life safety

systems of part-4: and Annexure B-22.5 of Part-3 of NBC 2016 is applicable.

6.5.2

Electrical Services

(1) The electric distribution cables/wiring shall be laid in separate duct the duct shall be sealed at every floor

with non-combustible materials having the same fire resistance as that of the duct. Low and medium voltage

wiring running in shaft and in false ceiling shall run in separate conduits.

(2) Water mains, telephone cables, intercom cables, gas pipes or any other service line shall not be laid in the

duct for electric cables. Use of bus ducts/solid rising mains instead of cables is preferred.

(3) The provision of dedicated telecommunication ducts for all new building proposals is mandatory for

conveyance of telecommunication and other data cables.

(4) Separate circuits for water pumps lifts, staircases and corridor lighting and blowers for pressurizing system

shall be provided directly from the main switchgear panel (for detailed specifications refer NBC 2016, Chapter

4 Fire and Life Safety).

Clause 3.4.6: Electrical Installation; and E-5 “Electrical Services” of Annexure E; Additional Requirements for

High Rise Buildings of Part-4 of NBC 2016 are applicable.

6.5.3

Alternate Source of Electric Supply

A stand-by electric generator shall be installed to supply power to staircase and corridor lighting circuits,

fire lifts, the stand-by fire pumps, pressurization fans and blowers, smoke extraction and damper system

in case of failure of normal electric supply. The generator shall be capable of taking starting current of all

68

the machines and circuits stated above simultaneously. If the stand-by pump is driven by diesel engine,

the generator supply need not be connected to the stand-by pump.

Clause 3.4.6.2: Emergency power for fire and life safety systems; and clause 3.4.6.4 Standby supply, of

Part-4 of NBC 2016 are applicable.

6.5.4

Air-conditioning

Air-conditioning shall conform to the following:

a. Escape routes like staircases, common corridors, lift lobbies, etc. shall not be used as return air passage.

b. The ducting shall be constructed of substantial gauge metal in accordance with good practice.

c. Wherever the ducts pass through fire walls or floors, the opening around the ducts shall be sealed with

materials having fire resistance rating of the compartment.

d. Where duct crosses a compartment which is fire rated, the ducts shall be fire rated for same fire rating.

Further depending on services passing around the duct work, which may get affected in case of fire

temperature rising, the ducts shall be insulated.

e. ceiling Metallic ducts shall be used even for the return air instead of space above the false.

f. Where plenum is used for return air passage, ceiling and its fixtures shall be of non-combustible material.

g. The materials used for insulating the duct system (inside or outside) shall be of non-combustible material;

glass wool shall not be wrapped or secured by any material of combustible nature.

h. Air ducts serving main floor areas, corridors, etc. shall not pass through the staircase enclosure.

i. The air-handling units shall be separate for each floor and air ducts for every floor shall be separated and

in no way inter-connected with the ducting of any other floor.

j. If the air-handling unit serves more than one floor, the recommendations given above shall be compiled

with in addition to the conditions given below:

i. Proper arrangements by way of automatic fire dampers working on smoke detector / or fusible link for

isolating all ducting at every floor from the main riser shall be made.

ii. When the automatic fire alarm operates, the respective air-handling units of the air conditioning system

shall automatically be switched off.

iii. The vertical shaft for treated fresh air shall be of masonry construction.

iv. The air filters of the air-handling units shall be of non-combustible materials or fire rated (Refer Clause

12.7.1 of Chapter 12)

v. The air-handling unit room shall not be used for storage of any combustible materials.

vi. Inspection panels shall be provided in the main trunk line to facilitate the cleaning of ducts of accumulated

dust and to obtain access for maintenance of fire dampers.

vii. No combustible material shall be fixed nearer than 150 mm to any duct unless such duct is properly

enclosed and protected with non-combustible material (glass wool or spyglass with neoprene facing enclosed

and wrapped with aluminium sheeting) at least 3.2 mm thick and which would not readily conduct heat.

69

Clause 3.4.8: Air Conditioning, Ventilation and Smoke Control; and clause 3.4.8.2 Air handling unit of Part-

4 of NBC 2016 are applicable.

6.5.5

Transformers

(1) If transformers are housed in the building below the ground level it shall be necessarily in the first

basement in separate fire resistance room of 4 hours rating. Transformer shall be dry type and shall be kept

in an enclosure with walls, doors and cut-outs having fire resistance rating of 4 hour. The room shall

necessarily be at the periphery of the basement having separate and direct access from open area at ground

floor through a fire escape staircase. The entrance to the room shall be provided with a steel door of 2 hours

fire rating. A curb of a suitable height shall be provided at the entrance in order to prevent the flow of oil from

ruptured, transformer into other parts of the basement. The switchgears shall be housed in a separate room

separated from the transformer bays by a fire-resisting wall with fire resistance not less than 4 hours.

(2) The transformer shall be protected by an automatic foam sprinkler system. When housed at ground floor

level it/they shall be cut-off from the other portion of premises by Fire Resisting Walls of 4 hours rating.

(3) A tank of RCC construction of adequate capacity shall be provided at lower basement level, to collect the

oil from the catch pit in case of emergency. The pipe connecting the catch-pit to the tank shall be of non-

combustible construction and shall be provided with a flame-arrester.

(4) The electric sub-station shall be located in a separate building in accordance with I.E. Rules 68(I) and 64(I)

.

(5) If this is not possible due to site conditions, the sub-station shall be located on the ground floor. As far as

possible sub-station shall not be installed in a basement, for such situations special provisions like

mechanical ventilation, wherever required, cable ducting, cable trays, top/bottom entry of HV/LV cable,

hooks on Transformer(s) & HV panels, adequate fire detection and firefighting arrangement, adequate

drainage, effective measures to prevent flooding etc. shall be provided. Adequate precautions shall also be

taken for water proofing to prevent seepage of water. A ramp shall also be provided with a slope, not steeper

than 1 in 7, for easy movement of equipment’s to and from sub-station.

(6) Fire regulations – The installations shall be carried out in conformity with the local regulations and rules

there under wherever they are in force. At other places NBC guidelines shall be followed.

Clause 3.4.6.3: Substation/Transformers; clause 3.4.6.3.1Oil filled substation; 3.4.6.3.2 Dry type

substation; 4.8 Hazardous Areas, Gaseous, Oil Storage Yard, etc; 4.4.2.4.3.5 Ramps. -of Part-4 of NBC

2016 are applicable.

6.5.6

Gas supply

(1) Town Gas / L.P. Gas Supply Pipes – Where gas pipes are run in buildings, the same shall be run in

separate shafts exclusively for this purpose and these shall be on external walls, away from the staircases.

There shall be no interconnection of this shaft with the rest of the floors.

(2) LPG distribution pipes shall always be below the false ceiling. The length of these pipes shall be as short

as possible. In the case of kitchen cooking range area, apart from providing hood, covering the entire cooking

range, the exhaust system should be designed to take care of 30 cum per minute per Sqm of hood protected

area. It should have grease filters using metallic grill to trip oil vapours escaping into the fume hood.

Note: For detailed information on gas pipe installations, reference may be made to Para.9 ‘Plumbing Services,

Section 3 Gas Supply’, of National Building Code of India.

70

(3) For large/commercial kitchens all wiring in fume hoods shall be of fiberglass insulation. Thermal detectors

shall be installed into fume hoods of large kitchens for hotels, hospitals and similar areas located in high rise

buildings. Arrangements shall be made for automatic tripping of the exhaust fan in case of fire.

(4) If LPG is used, the same shall be shut off. The voltage shall be of 24 V or 100V DC operated with the

external rectifier. The valve shall be of the hand re-set type and shall be located in an area segregated from

cooking ranges. Valves shall be easily accessible. The hood shall have manual facility for steam or carbon

dioxide gas injection, depending on duty condition; and Gas meters shall be housed in a suitably constructed

metal cupboard located in a well-ventilated space, keeping in view the fact that LPG is heavier than air and

town gas is lighter than air

Clause 4.7 Gas Supply of Part-4 of NBC 2016 is applicable.

6.5.7

Boiler Room

Further, the following additional aspects may be taken into account in the location of Boiler/Boiler Room:

a. The boiler shall not be allowed in sub-basement but be allowed in the first basements away from the escape

routes.

b. The boilers shall be installed in a fire resisting room of 4 hours fire resistance rating, and this room shall

be situated on the periphery of the basement. Catch pit shall be provided at the low level. Entry to this room

may be provided with a composite door of two-hour fire resistance

c. The boiler room shall be provided with fresh air inlets and smoke exhausts directly to the atmosphere.

d. Foam inlets shall be provided on the external walls of the building at the ground floor level to enable the

fire services to use foam in case of fire.

e. The furnace oil tank for the boiler, if located in the adjoining room shall be separated by fire resisting wall

of 4-hour rating. Entry to this room shall be provided with a composite door of 2-hour fire resistance. A curb

of suitable height shall be provided at the entrance in order to prevent the flow of oil into the boiler room in

case of tank rupture.

Clause 3.4.9 Heating; clause 4.8 Hazardous Areas, Gaseous, Oil Storage Yard, etc of Part-4 of NBC 2016 is

applicable.

6.5.8

Helipad

Buildings above 200 m in height, helipad shall be provided.

6.5.9

Disaster Management / Fire Safety

Refer Chapter 12 of this document.

6.5.10 Sustainable Environment and Buildings

Refer Chapter 11& Chapter 15 of this document

6.5.11 Structural Safety

As per provisions made for Structural Safety in Chapter 7

71

CHAPTER 7

PROVISIONS FOR STRUCTURAL SAFETY

7.1 Structural design and safety

For any building under the jurisdiction of these Byelaws structural/retrofitting design shall only be carried

out by a registered Licenced Structural Engineer. Proof checking of various designs/ reports shall be carried

out by competent authority as per Table 7.1wherever applicable.

.

7.1.1

Additional Provisions for natural hazard prone areas

Generally, the structural design of foundations, elements of masonry, timber, plain concrete, reinforced

concrete, pre-stressed concrete and structural steel shall conform to the provisions of Part 6: Structural

Design –

Section– 1 Loads, Forces and Effects

Section– 2 Soils and Foundations,

Section– 3 Timber and Bamboo,

Section– 4 Masonry,

Section– 5 Concrete &

Section– 6 Steel

Section– 7 Prefabrication Systems, Building and Mixed /Composite Construction of National Building Code

of India (NBC), taking into consideration the Indian Standards as given below.

For General Structural Safety

1) IS: 456:2000 ‘Code of Practice for Plain and Reinforced Concrete’.

2) IS: 800-2007 ‘Code of Practice for General Construction in Steel’.

3) IS: 801-1975 ‘Code of Practice for Use of Cold Formal Light Gauge Steel Structural Members in General

Building Construction’

4) IS 875 (Part 2):1987 Design loads (other than earthquake) for buildings and structures Part2 Imposed

Loads.

5) IS 875 (Part 3):1987 Design loads (other than earthquake) for buildings and structures Part 3 Wind Loads.

6) IS 875 (Part 4):1987 Design loads (other than earthquake) for buildings and structures Part 4 Snow Loads.

7) IS 875 (Part 5):1987 Design loads (other than earthquake) for buildings and structures Part 5 special loads

and load combination.

8) IS: 883:1994 ‘Code of Practice for Design of Structural Timber in Building.

9) IS: 1904:1986 (R 2005) ‘Code of Practice for Structural Safety of Buildings: Foundation’

10) IS 1905:1987 ‘Code of Practice for Structural Safety of Buildings: Masonry Walls.

72

11) IS 2911(Part 1): Section 1: 2010 ‘Code of Practice for Design and Construction of Pile Foundation Section

1

Part 1: Section 2 Bored Cast-in-situ Piles

Part 1: Section 3 Driven Precast Concrete Piles

Part 1: Section 4 Bored Precast Concrete Piles

Part 2: Timber Piles

Part 3: Under Reamed Piles

Part 4: Load Test on Piles

For Cyclone/Wind Storm Protection

12) IS 875 (3):1987 ‘Code of Practice for Design Loads (other than Earthquake) for Buildings and Structures,

Part 3, Wind Loads’

13) Guidelines (Based on IS 875 (3)-1987) for improving the Cyclonic Resistance of Low-rise houses and other

building.

For Earthquake Protection

14) IS: 1893 (Part 1)-2002 ‘Criteria for Earthquake Resistant Design of Structures (Fifth Revision)’

15) IS: 13920-1993 ‘Ductile Detailing of reinforced Concrete structures subjected to Seismic Forces-Code of

Practice

16) IS: 4326-2013 ‘Earthquake Resistant Design and construction of buildings code of practice (second

revision)’

17) IS: 13828-1993 ‘Improving earthquake resistance of low strength masonry buildings-guidelines

18) IS: 13827:1993 ‘Improving Earthquake Resistance of Earthen Buildings-Guidelines

19) IS: 13935-2009 ‘Seismic Evaluation, Repair and Seismic Strengthening of Buildings -Guidelines’

For Protection of Landslide Hazard

20) IS 14458 (Part 1): 1998 Guidelines for retaining wall for hill area: Part1Selection of type of wall.

21) IS 14458 (Part 2): 1997 Guidelines for retaining wall for hill area: Part 2 Design of retaining/breast walls

22) IS 14458 (Part 3): 1998 Guidelines for retaining wall for hill area: Part 3Construction of dry stone walls

23) IS 14496 (Part 2): 1998 Guidelines for preparation of landslide – Hazard zonation maps in mountainous

terrains: Part 2 Macro-zonation.

Note: Whenever an Indian Standard including those referred in the National Building Code or the National

Building Code is referred, the latest revision of the same shall be followed except specific criteria, if any,

mentioned above against that code.

73

7.1.2

Structural Design Basis Report (SDBR)

In compliance of the design with the above Indian Standard, the Structural Engineer on Record will submit

a structural design basis report in the Performa attached herewith covering the essential safety requirements

specified in the Standard.

The ‘Structural Design Basis Report (SDBR)’consists of four parts

Part 1: General Information/ Data

Part 2: Load Bearing Masonry Buildings

Part 3: Reinforced Concrete Buildings

Part 4: Steel Buildings

a) Drawings and Documents to be submitted for approval of appropriate authorities shall include SDBR as

detailed below:

Part 1: Completed

Part 2: (if applicable) – completed

Part 3: (if applicable) – undertaking that completed Part 3 will be submitted before commencement of

construction.

Part 4: (if applicable) – undertaking that completed Part 4 will be submitted before commencement of

construction.

b) SDBR as detailed below shall be submitted to the appropriate authority as soon as design of foundation is

completed, but not later than one month prior to commencement of construction.

Part 1: Completed

Part-2, Part-3 or Part-4: (if applicable) Completed

7.1.3

Seismic strengthening/retrofitting

Prior to seismic strengthening/retrofitting of any existing structure, evaluation of the existing structure as

regards structural vulnerability in the specified wind/seismic hazard zone shall be carried out by the Licenced

Structural Engineer. If as per the evaluation of the Licenced Structural Engineer the seismic resistance is

assessed to be less than the specified minimum seismic resistance as given in the note below, action will be

initiated to carry out the upgrading of the seismic resistance of the building as per applicable standard

guidelines.

Note:

1. For masonry buildings reference shall be made to IS 4326 and IS 13935

2. For concrete buildings and structures reference shall be made to IS15988: 2013 Seismic evaluation and

strengthening of existing RCC buildings.

7.1.4

Buildings with Soft Storey

In case buildings with a flexible storey, such as the ground storey consisting of open spaces for parking that

is ‘Stilt buildings or any other storey with open halls, special arrangements are to be made to increase the

lateral strength and stiffness of the soft/open storey such as Steel bracing / Shear walls / Brick infill’s

between columns. Dynamic analysis of building is to be carried out including the strength and stiffness effects

74

of infills and inelastic deformations in the members, particularly, those in the soft storey, and the structural

members are to be designed accordingly.

Alternatively, the following design criteria are to be adopted after carrying out the earthquake analysis,

neglecting the effect of infill walls in other storeys:

a. The columns and beams of the soft storey shall be designed for 2.5 times the storey shears and moments,

calculated under seismic loads specified in the other relevant clauses; or,

b. Besides the columns designed and detailed for the calculated storey shears and moments, shear walls shall

be placed symmetrically in both directions of the building as far away from the Centre of the building as

feasible; to be designed exclusively for 1.5 times the lateral storey shear force calculated as before. For details

of design and provisions, IS 1893, Part 1 shall be referred. Further, the provisions of Clause 4.8 of Part-6 of

NBC is applicable. .

7.1.5

Review of structural design

1) The Local Authority shall create a Structural Design Review Panel (SDRP) consisting of senior Registered

Licenced Structural Engineers. whose task will be to review and certify the design prepared by Registered

Licenced Structural Engineer. whenever referred by the competent authority.

2) The Reviewing Agency shall submit addendum to the certificate or a new certificate in case of subsequent

changes in structural design.

3) Table-7.1 gives requirements of SDRP for different structures of different complexities.

(4) Buildings & structures greater than 45m m in height or more than G+14 floors will require proof

checking by SDRP. All other buildings requiring Proof Check as mentioned in Table 7.1, shall be Proof

checked by EMSE.

Table 7.1 Proof Checking Requirements for Structural Design

Sl. No

Type of Structure

Submission from SER

To be Proof Checked

1.

Load Bearing Buildings up to

three storeys

SDBR*

Not to be checked

2.

Buildings of 15.0 m height and

above.

SDBR

To be checked

Preliminary design

To be checked

3.

Buildings of 15.0 m height and

above.

SDBR

To be checked

Preliminary design

To be checked

Detailed

structural

design

and

structural

drawing

To be checked

4.

Non-Residential Buildings

SDBR

To be checked

Preliminary design

To be checked

Detailed

structural

design

and

structural

drawing

To be checked

* SDBR – Structural Design Basis Report

Notes:

1. Table 5.3may be referred for occupant load/live loads for different building types.

2.At the preliminary proposal stage of a project, the objective is to undertake feasibility study/comparison of a

number of possible alternatives of structural schemes and determine the most cost effective one, detailed

structural calculations are not necessary for each alternative scheme. However, it is necessary to determine the

member sizes and reinforcement content in order to determine the cost. By making conservative assumptions it

75

is possible to derive simplified calculations for both analysis and design. This is called ‘Preliminary or

approximate analysis, and design’.

After the most cost-effective scheme is selected and signed-off by the Client, the detailed calculations

are performed on the selected scheme to determine the precise structural members and composition (size,

dimension and stress behaviour), and this is called the ‘Detailed structural design’.

In the aforesaid, the design of structural members is typically assumed to account for all the stress

loads identified from section xx to be applicable in the given project.

3. Special structure means large span structures such as stadium, assembly halls, or tall structures such as

water tanks, TV tower, chimney, etc.

It will be seen from the Table 7.1 above that there is a wide range of structure typology, and the requirement

by the Competent Authority for third party verification will depend on the type of structure.

4. SER may adopt suitable structural design software for designing the buildings.

7.1.6

Certification regarding structural safety in design

Registered Licenced Structural Engineer shall give a certificate of structural safety of design as per Form-

XV at the time of completion, stating that the structure of the building has been designed as per the

relevant standards satisfying the soil investigation report submitted by GER and for the loads expected on

the building and that the building will be structurally safe if constructed accordingly. (as per Clause 3.17)

7.1.7

Constructional safety

7.1.7.1

Supervision

All constructions, shall be carried out under supervision of Licenced Professional who shall submit the

Completion certificate to the Local Authority for obtaining Occupation Certificate. .

7.1.7.2

Certification of structural safety in construction

Licenced Structural Engineer shall give a certificate of structural safety of construction as per Performa given

in Form- XVA at the time of completion, stating that the building is structurally safe and the construction is

in accordance with the specified designs and drawings. (as per Clause 3.17).

7.1.7.3

Inspection

All the construction for high-rise buildings higher than seven storeys, public buildings and special structures

shall be carried out under quality inspection program prepared and implemented under the Building Quality

Auditor (BQA) in seismic zones IV &V (as notified by the government).

7.1.8

Control of signage & outdoor display structures, cell phone towers and telephone Towers.

Following provisions shall apply for telecommunication infrastructure

a) Location: The Telecommunication Infrastructure shall be either placed on the building roof tops or on the

ground or open space within the premises subject to other regulations.

b) Type of structure

i. Steel fabricated tower or antennae on M.S. pole

ii. Prefabricated shelters of fibre glass or P.V.C. on the building roof top /terrace for equipment.

iii. Masonry Structure/ Shelter on the ground for equipment.

iv. D.G. set with soundproof cover to reduce the noise level.

76

c) Requirement:

i. Every applicant has to obtain/ procure the necessary permission from the ‘Standing Advisory Committee

on Radio Frequency Allocation’ (SACFA)issued by Ministry of Telecommunications.

ii. Every applicant will have to produce the structural safety & stability certificate for the tower as well as the

building from the Structural Engineer on Record (SER) which shall be the liability of both owner and SER.

iii. Applicant has to produce / submit plans of structure to be erected

d. Projection: No Pager and/or Telephone Tower shall project beyond the existing building line of the building

on which it is erected in any direction.

Provided, for TELECOMMUNICATION SPACES ANDCONNECTING HARDWARE, clause 3.1 of Section 6 of

Part-8 of NBC 2016 is applicable;

for signage & outdoor display structures, “Setion 2 Signs and Outdoor Display Structures” of Part-10 of NBC

2016 is applicable.

7.2

Inspection

The general requirement for inspection and certification of the development shall be as prescribed in Clause

no.3.15

7.2.1

Maintenance of Buildings

In case of building older than fifty years, it shall be the duty of the owner of a building, to get his building

inspected by a Licenced Structural Engineer within a year from the date of coming into force of these Byelaws.

The Structural Inspection Report (Form No.16, of the MHA Expert Committee Report) shall be produced by

the Owner to the Appropriate Authority. If any action, for ensuring the structural safety and stability of the

building is to be taken, as recommended by Licenced Structural Engineer, it shall be completed within five

years. For other buildings, the owner shall get his building inspected after the age of building has crossed

forty years. .

7.2.2

Protective Measures in Natural Hazard Prone areas

In natural hazard, prone areas identified under the land use Zonal Regulations, structures buildings and

installations which cannot be avoided, protective measures for such construction/development should be

properly safeguarded based on the suggestion given in the Report of the MHA Expert Committee - Volume I.

7.3

Registration

Registration of the required Licenced Professionals has to be done as per these bye laws.

7.4

Appointment of Professionals on Record

The Owner / Promoter shall engage the services of the Licenced Professionals for obtaining the building

licence and construction of the respective building.

7.5

Alternative Materials, Methods of Design and Construction and Tests

The provision of the Byelaws is not intended to prevent the use of any material or method of design or

construction not specifically prescribed by the byelaw provided any such alternative has been approved. The

building materials approved by B.I.S. or any statutory body will form part of the approved building material

and technology as part of the Byelaws.

The Local Authority shall promote and encourage use of pre-fabricated factory-made building components for

medium to large scale projects that have significant impact. The use of ready-mix concrete (RMC) shall also

be encouraged for in-situ concrete constructions.

Clause 11.2.6 may be referred for further aspects of Sustainability and incentivized promotion of alternative

materials, methods in construction.

77

CHAPTER 8

8

LAND USE ZONES

In order to promote public health, safety and the general social welfare of the community, it is necessary to

apply control and reasonable limitation on the development of land and buildings. This is to ensure that most

appropriate, economical and healthy development of the Town/City takes place in accordance with the land

use plan, and its continued maintenance over the years. For this purpose, the city is divided into number of

use zones, such as residential, commercial, industrial, public and semi-public etc. Each zone has its own

regulations, as the same set of regulations cannot be applied to the entire Town. Zonal Regulations protects

residential areas from the harmful invasions of commercial and industrial uses and at the same time promotes

the orderly development of industrial and commercial areas, by suitable regulations on spacing of buildings

to provide adequate light, air, protection from fire, etc. It prevents overcrowding in buildings and on land to

ensure adequate facilities and services.

Zonal regulations are not retrospective. It does not prohibit the uses of land and buildings that are lawfully

established prior to the coming into effect of these Zonal Regulations.

If these uses are contrary to the newly proposed uses, they are termed non-conforming uses and are gradually

eliminated over years without inflicting unreasonable hardship upon the property owner.

The Zonal Regulations and its enforcement ensure proper land use and development and form an integral

part of the Master Plan. It also ensures solutions to problems of development under local conditions.

The Master Plan along with the Zonal Regulations approved under sub section (3) of section 13 of the

Karnataka Town and Country Planning Act, 1961 approved by the Government, time to time shall be

applicable.

78

CHAPTER 9

9

PROVISIONS FOR DIFFERENTLY-ABLED, ELDERLY PERSONS AND CHILDREN

9.1 Applicability

These regulations shall be applicable to all buildings and facilities used by the public such as educational,

institutional, assembly, commercial, business, mercantile buildings and group housing constructed on plots

having an area of more than 2000 Sq.m. It shall not apply to private residential buildings.

9.2 Guidelines and Provisions

1.Provisions in the following guidelines shall apply:

2. ‘Guidelines and Space Standards for Barrier Free Built Environment for Disabled and Elderly Persons’,

(1998), Central Public Works Department, GoI

3. ‘Manual on Barrier Free Environment’, (2002), O/o the Chief Commissioner for Persons with Disabilities,

Ministry of Urban Development, Goo.

4. ‘National Building Code’, (2016), Bureau of Indian Standards,

5. ‘National Policy for Persons with Disabilities’, (2006), Ministry of Social

Justice and Empowerment, Goo.

6. Harmonised Guidelines and Space standards for Barrier Free Environment for Persons with

Disabilities”2016 published by TCPO.

‘

9.3 Types of buildings to adopt barrier free guidelines as notified by the State Government

9.3.1

Buildings to be designed for Ambulant Disabled People

Higher Secondary School, Conference Hall, Dance Halls, Youth Centres, Youth Clubs, Sport Centres, Sport

Pavilions, Boat Club Houses, Ice Rinks, Bowling Centres, Swimming Pools, Police Stations, Law Courts,

Courts Houses, Sport Stadiums, Theatres, Concert Halls, Cinemas, Auditoria, Small Offices (the maximum

plinth area 1400 Sqm) Snack Bars, Cafes and banqueting rooms (for capacity above 50 dinners).

Note:

a. In sport stadiums provisions shall be made for non-ambulant spectators (small wheel chair)

b. @ 1:1000 up to 10,000 spectators and @ 1:2000 for spectators above 10,000.

c. In Theatres, Concert Halls, Cinemas and Auditoria provisions shall be made for non-ambulant spectators

(Small Wheel Chairs) @ 1/250 up to 1000 spectators and 1/500 for spectators above1000.

9.3.2

Buildings to be designed for Non-Ambulant Disabled People

Schools for differently abled, Botanical Gardens, Religious Buildings, Elderly People Clubs, Village Halls,

Day Centres, Junior Training Centres, Post Offices, Banks, Dispensaries, Railway Stations, Shops, Super

Markets, and Departmental Stores.

Note: Large wheel chair criteria shall be applicable on ground floors of the following building, post offices,

banks, dispensaries, railway station, shops, supermarkets, and departmental stores.

79

9.3.3

Buildings to be designed for Non-Ambulant People (using small wheel chairs)

Public lavatories in Tourist Spots, Clubs, Motels, Professional and Scientific Institution, Museum, Art

Galleries, Public Libraries, Laboratories, Universities, College for further Education, Teachers Training

Colleges, Technical College, Exhibition Halls, Dentist Surgeries, Administrative Department of the Hospitals,

Service Stations, Car Parking Buildings, Airports Terminals, Bus Terminals, Factories Employing differently-

abled for sedentary works, Large Offices, (with plinth area above 1400 Sq.mt.), Tax Offices, Passport Offices,

Pension Offices, and Labour Offices, Cafes, Banqueting Rooms and Snack Bars (For capacity above

100dinners).

9.3.4

Site development

Level of the roads, access paths and parking areas shall be described in the plan along with specification of

the materials.

9.3.4.1 Access Path / Walk Way

Walkways and pathways (used here interchangeably shall meet the following general requirements:

a) Walkways shall be smooth, hard and have levelled surface suitable for walking and wheeling. Irregular

surfaces as cobble stones, coarsely exposed aggregate concrete, bricks, etc, often cause bumpy rides and

shall be avoided.

b) Minimum walkway width shall be provided as per B-2.2.2 (1800 mm). The width of footpath shall be in

accordance with 4.3.2.1.1

c) The walkway shall not have a gradient exceeding 1:20. If the slope or any part of a walkway on an accessible

route to a building exceeds 1:20, it shall be designed and constructed as a ramp in accordance with B-6.2.

d) Where pathway meets the road, a kerb shall be provided; which shall be designed in accordance with B-

2.3.

e) The cross-fall gradient across an accessible route shall not exceed 1:50 (20 mm/m), except

when associated with a dropped kerb.

f) The requirements for drainage of pathways shall be as per B-2.2.5.

g) When walkways exceed 60 m in length, it is desirable to provide rest area adjacent to the

walk at convenient intervals of 30 m in the form of benches/resting seats. For comfort, seat height shall be

between 450 mm and 500 mm, and the seating shall have a back rest and arm rests at 700 mm height. One

side of seating may be without arm rest to address the transfer needs of persons with disabilities. A colour

contrast should be provided around the seating area for ease of identification by persons with low vision.

h) Texture change in walkways adjacent to seating shall be provided for persons with vision impairment by

means of warning blocks (see B-2.5).

i) Gratings and manholes should be avoided in walks.

9.3.4.2 Parking

For parking of vehicles of differently-abled people, the following provisions shall apply:

Location of Parking

The designated accessible parking spaces that serve a building shall be located as near as possible to the

main entrance, and the distance from the accessible parking space to the main entrance shall not be more

than 30 m. In case the access is through lift, the parking shall be located within 30 m of the lift lobby. Kerb

ramp from parking space to an adjacent higher pedestrian path shall be provided in accordance with NBC

2016.

80

Accessible Car Parking Space Dimensions and Surface Requirements

The accessible car parking space shall meet the following requirements:

a) The minimum width of the parking space for a car shall be 3600 mm and the minimum length shall be 5

400 mm. This minimum width includes the transfer area beside the car with a minimum of 1 500 mm.

Number of Designated Accessible Parking Spaces

The following minimum requirements concerning the number of parking places shall apply:

a) A minimum of one accessible designated parking space shall be provided in every parking area;

b) For up to 10 parking spaces, one designated accessible parking space shall be provided;

c) For up to 25 parking spaces, two designated accessible parking space shall be provided;

d) For up to 50 parking spaces, three designated accessible parking spaces shall be provided;

e) For up to 100 parking spaces, four designated accessible parking spaces shall be provided;

f) For up to 200 parking spaces, six designated accessible parking spaces shall be provided; and

g) For over 200 parking spaces, six designated accessible parking spaces for 200 parking spaces and one for

each additional 100 parking spaces shall be provided.

In specialized facilities such as health care facilities, shopping areas and recrational facilities, a greater

number of designated accessible parking spaces shouldbe considered

9.4 Building requirements

The specified facilities in buildings for differently abled persons shall be as follows:

9.4.1

Approach to plinth level

Every building should have at least one entrance accessible to the differently able and shall be indicated by

proper signage. This entrance shall be approached through ramp together with the stepped entry.

(1) Ramped Approach: Ramp shall be finished with non-slip material to enter the building. Minimum

width of ramp shall be 1800mm with maximum gradient 1:12.

Length of ramp shall not exceed 9.0 meter having 800mm high hand rail on both sides extending 300mm

beyond top and bottom of the ramp. Minimum gap from the adjacent wall to the hand rail shall be 50mm.

(2) Stepped Approach: For stepped approach size of tread shall not be less than300mm and maximum

riser shall be 150mm. Provision of 800mm high hand rail on both sides of the stepped approach similar

to the ramped approach.

(3) Exit/Entrance Door: Minimum & clear opening of the entrance door shall be900mm and it shall not

be provided with a step that obstructs the passage of a wheelchair user. Threshold shall not be raised

more than 12mm.

(4) Entrance Landing: Entrance landing shall be provided adjacent to ramp with the minimum dimension

1800mm x 2000mm. The entrance landing that adjoins the toped of a slope shall be provided with floor

materials to attract the attention of visually impaired person's (limited to coloured floor material whose

colour and brightness is conspicuously different from that of the surrounding floor material or the

material that emits different sound to guide visually impaired persons. Finishes shall have a non-slip

surface with a texture traversable by a wheel chair. Kerbs wherever provided should blend to a common

level.

81

9.4.2

Corridor connecting the entrance/ exit for the differently abled

The corridor connecting the entrance / exit for differently abled leading directly outdoors to a place where

information concerning the overall use of the specified building can be provided to visually impaired persons

either by a person or by signs, shall be provided as follows:

a) Guiding floor materials shall be provided or device that emits sound to guide visually impaired persons.

b) The minimum width shall be 1500mm.

c) In case there is a difference of level, slope ways shall be provided with a slope of 1:12.

d) Handrails shall be provided for ramps/slope ways.

9.5

Stair-ways

One of the stair–ways - near the entrance / exit for the differently abled shall have the following provisions:

a) The minimum width shall be 1350 mm.

b) Height of the riser shall not be more than 150 mm and width of the tread300mm. The steps shall not have

abrupt (square) nosing.

c) Maximum number of risers on a flight shall be limited to 12

d) Handrails shall be provided on both sides and shall extend 300 mm on the top and bottom of each flight

of steps.

9.6

Lifts

Wherever lift is required as per Byelaws, provision of at least one lift shall be made for the wheel chair user

with the following cage dimensions of lift recommended for passenger lift of 13 person’s capacity of NBC 2016,

BIS. Section 4.9.3 Table no1-Desirable Lift size

Clear internal width 1100 mm

Clear internal depth 2000 mm

Entrance door width 900 mm

a) A hand rail not less than 600mm long at 1000mm above floor level shall be fixed adjacent to the control

panel.

b) The lift lobby shall be of an inside measurement of 1800 mm x 2000 mm or more.

c) The time of an automatically closing door should be minimum 5 seconds and the closing speed should

not exceed 0.25 m/ sec.

d) The interior of the cage shall be provided with a device that audibly indicates the floor, the cage has

reached indicates that the door of the cage of entrance/exit is either open or closed.

e) Graphic/Braille signage, as per the Harmonized Guidelines, shall be provided in the lift lobby.

9.7

Toilets

One special W.C. in a set of toilets shall be provided for the use of differently able with essential provision of

washbasin near the entrance for the differently abled.

82

a) The minimum size shall be 1500 mm x 1750 mm.

b) Minimum clear opening of the door shall be 900mm and the door shall swing out.

c) Suitable arrangement of vertical/horizontal handrails with 50mm clearance from wall shall be made in the

toilet.

d) The W.C. seat shall be 500mm from the floor

Other specifications shall confirm to the Annex B of part3 of NBC 2016.

9.7.1

Provision of WCs in buildings without lift:

Provision of special W.C. shall be made on all floors for buildings designed for ambulant disabled persons.

For buildings designed for non-ambulant disabled special W.C. shall be provided at Ground Floor. Size of

W.C. shall depend on the type of wheel chair used by the disabled.

9.7.2

Provisions of WCs in buildings with lift

Provision of Special W.C. shall be made on all floors. Size will depend on the category of disabled for whom it

has been provided.

9.7.3

Toilet Details: For Toilets Designed for Ambulant Disabled and Non-Ambulant Disabled.

Toilet rooms and sanitary rooms requirements of Ambulant Disabled and Non-Ambulant Disabled persons

should confirm to the Annex B of part3 of NBC 2016.

9.8

Designing for Children

In the buildings meant for the pre-dominant use of the children, it will be necessary to suitably alter the

height of the handrail and other fittings & fixtures etc.

Note: Guiding / Warning Floor Material: The floor material to guide or to warn the visually impaired

persons with a change of colour or material texture and easily distinguishable from the rest of the

surrounding floor materials. The material with different texture gives audible signals with sensory

warning when a person moves on this surface with walking stick. The guiding/warning floor material is

meant to give the directional effect or warn a person at critical places. It should be provided in the

following areas:

a. The access path to the building and to the parking area.

b. The landing lobby towards the information board, reception, lifts, staircases and toilets

c. Immediately at the beginning/end of walkway where there is a vehicular traffic.

d. At the location abruptly changing in level or beginning/end of a ramp.

e. Immediately in front of an entrance/exit and the landing.

9.9

Drinking Water:

The drinking water facility (fountains, coolers, taps, etc) shall comply with the following:

83

Wall/post-mounted cantilevered units shall have a clear floor space of at least 900 mm × 1 200 mm. the

front edge of the unit shall extend 430-480 mm from the wall. It shall have a clear knee space between

the bottom of the apron/ equipment and floor or ground of at least 900 mm wide, 200 mm deep extending

from the front edge of the equipment to back towards the wall, and 700 mm high. It shall have a toe space

not less than 900 mm wide, mm high, extending from the back wall to a maximum of 150 mm.

Freestanding or built-in-drinking water units not having a clear space under them shall have a clear floor

space of at least 1 200 mm wide mm in front of the unit.

Spout heights should be between 800-900 mm, measured from the floor to the spout outlet. The

maximum distance of the spout from the front edge of the drinking water facility shall be 125 mm. There

shall be water glass provision; a minimum 100 mm space below the spout outlet shall be provided to

allow for the insertion of a cup or glass.

Wall-mounted drinking water provision in an alcove is preferred, because it does not create a hazard for

persons with visual impairments. The provision of two drinking facilities at different heights is very

convenient for standing adults, people in wheelchairs and children. Where only one is provided, it shall

be at a height of 700 mm above floor level

Controls shall be centrally positioned at the front of the unit or, if at the side, on both sides, not more than

180 mm from the front. Control shall be easily operable with one hand with an operative force.

9.10 Refuge

An alternative to immediate evacuation of a building via staircases and/ or lifts is the movement of disabled

persons to areas of safety within a building. If possible, they could remain there until the fire is controlled

and extinguished or until rescued by the fire fighters.

a) It is useful to have the provisions of a refuge area, usually at the fire protected stair landing on each floor

that can safely hold one or two wheelchairs.

b) Hand Doorways with clear opening width of 900 mm and regular compliance

c) Have an alarm switch installed between 900 mm and 1200 mm from floor level.

Annex-B of Part 3 of NBC-2016 is applicable.

9.11 Proper signage

1) Appropriate identification of specific facilities within a building for the differently abled persons should be

done with proper signals.

2) Visually impaired persons make use of other senses such as hearing and touch to compensate for the lack

of vision, whereas visual signals benefit those with hearing disabilities. Signs should be designed and located

so that they are easily legible by using suitable letter size .The height of letters, figures, signs and graphical

symbols shall be between 15 mm and 55 mm. The minimum height of its relief shall be 0.8 mm; a height

between 1 mm and 1.5 mm is preferred .The profile of the relief should be shaped as a rounded upside-down

turned letter V.

3) For visually impaired persons, information board in brail should be installed on the wall at a suitable height

and it should be possible to approach them closely.Where an arrow is used in the tactile sign, a small arrow

shall be provided for Braille readers. On signs with multiple lines of text and characters, a semi-circular

Braille locator on the left margin shall be horizontally aligned with the first line of Braille text. Braille should

be raised, domed and comfortable totouch. It should be located 8 mm below the bottom line of the text and

be left justified.Common alternative formats may be used to assist people with visual impairments who are

best able to interpret information through hearing or touch. Embossed letters, raised pictograms and raised

84

arrows are tactile features that may be incorporated into signs, which may be particularly helpful to persons

with visual impairments.

4) To ensure safe walking, there should not be any protruding sign which creates obstruction in walking.

5) Public Address System may also be provided in busy public areas.

6) The symbols/information should be in contrasting colour and properly illuminated because people with

limited vision may be able to differentiate amongst primary colours.

7) International Symbol Mark for wheel chair be installed in a lift, toilet, staircase, parking areas, etc., that

have been provided for the differently abled.

9.12

Public Building regulations

In case of design regulations in public buildings (excluding domestic buildings), provisions for

differently-abled shall be adopted as per Appendix-XVI of the Byelaws and according to the Annex ‘D’

of Part 3, NBC 2016.

85

CHAPTER 10

10. RAINWATER HARVESTING

10.1

Rainwater harvesting principle

The harvesting of rainwater simply involves the collection of water from surfaces on which rain falls, and

subsequently storing this water for use. The rainwater collected can be stored for direct use or can be

recharged into the underground aquifers. In scientific terms water harvesting (broadly) refers to collection

and storage of rainwater from the rooftops. This also restricts evaporation and seepage into building

foundations. Every owner or occupier of a building having sital area of not less than 2400 square feet or every

owner who propose to construct a building on a sital area of not less than 1200 square feet shall provide rain

water harvesting structure for storage for reuse or for ground water recharge within such date as may be

notified by the State Government in such manner and subject to such conditions as may be provided in the

rules and guidelines issued by the Corporation, while submitting for the sanction of the building plan, shall

mandatorily include the complete proposal of rainwater harvesting and method of calculation as per Appendix

XVII

A rainwater harvesting system consists of:

i.

Roof catchment

ii.

Gutters

iii.

Down pipes

iv.

Rain water/ Storm water drains

v.

Filter chamber

vi.

Storage Tanks/ Pits/ Sumps

vii.

Ground Water recharge structures like pit, trench, tube well or combination of above structure.

Rainwater Harvesting is a way to capture the rain runoff, store that water aboveground or charge the

underground aquifers and use it later. This happens naturally in open rural areas. But in congested, over-

paved metropolitan cities, there is a need to devise methods to capture the rain water. The rainwater that is

incident on the surface/ roof top is guided to bore wells or pits or new/old/ abandoned wells through small

diameter pipes to recharge the underground water which can be used later whenever required.

Rainwater can be harvested to the extent of 55,000 Liters per 100Sq. m area per year from rooftops.

10.2

Factor Affecting Run Off from Catchment

i.

Rainfall - quantity, pattern, intensity & duration.

High intensity in less duration may get same quantity but may get wasted due to high surface

run off due to less infiltration capacity whereas mild rainfall with long duration will help in

recharging ground water.

ii.

Catchment area characteristic.

Unpaved surface have greater capacity of retaining rain water & similarly green patches of grass

can retain large proportion of rainwater.

Runoff depends upon the area and type as well as surface of catchment over which it falls as well as surface

features. Runoff can be generated from both paved and unpaved catchment areas. Paved surfaces have a

86

greater capacity of retaining water on the surface and runoff from unpaved surface is less in comparison to

paved surface. In all calculations for runoff estimation, runoff coefficient is used to account for losses due to

spillage, leakage, infiltrations catchment surface wetting and evaporation, which will ultimately result into

reduced runoff. Runoff coefficient for any catchment is the ratio of the volume of water that run off a surface

to the total volume of rainfall on the surface. The runoff coefficient for various surfaces is given in table 1.1.

Table 10.1 Runoff coefficients for various surfaces

Sl

No

Type of Surface

Coefficient of Runoff

1 Concrete roof area

0.9

2 Paved podium areas and asphalted roads

0.8

3

Tiles

0.8-0.9

4

Corrugated metal sheets

0.7-0.9

Ground Surface Covering

Untreated ground catchment

5

Soil on slope less than 10%

0.0-0.3

6

Rocky material catchment

0.2-0.5

7 Business area

8

Down Town

0.7-0.95

9

Neighbourhood

0.5-0.7

Residential Complexes in Urban Areas

10 Single family

0.3-0.5

11 Multiunits, detached

0.40-0.60

12 Multiunits, attached

0.60.75

13 Residential Complexes in Suburban Areas Apartments

0.5-0.70

Industrial

14 Light

0.5-0.7

15 Heavy

0.6-0.9

16 Parks, cemeteries

0.10-0.25

87

17 Play grounds

0.20-0.35

18 Railroad yard

0.20-0.35

19 Unimproved Land Areas

0.10-0.30

20 Aspheltic or concrete pavement

0.70-0.95

21 Brick pavement

0.70-0.85

22 Lawn, sandy soil having slopes

23 Flat 2%

0.05-0.10

24 Average 2 to 7%

0.10-0.15

(Ref: Clause 4.5.11.2 of Part 9, Plumbing Services (Including Solid Waste Management), Section 2, Drainage

and Sanitation, NBC 2016 and Rain water harvesting manual, CPWD,2019)

10.3

Rainwater harvesting techniques:

There are two main techniques of rain water harvestings.

a. Storage of rainwater on surface for future use.

b. Recharge to ground water.

10.4

Harvesting provisions in various Building categories:

All buildings in a city contribute to the rainwater runoff during the monsoon and hence such runoff can be

harvested for water reuse/recharge.

Rainwater harvesting in a building site includes storage or recharging into ground of rainwater falling on

the terrace or on any paved or unpaved surface within the building site.

The following systems may be adopted for harvesting the rainwater drawn from terrace and the paved

surface.

a)

Open well of a minimum of 1.00 m dia. and 6.00 m in depth into which rainwater may be channelled

and allowed after filtration for removing silt and floating material. The well shall be provided with

ventilating covers. The water from the open well may be used for non-potable domestic purposes such

as washing, flushing and for watering the garden, etc.

b)

Rainwater harvesting for recharge of ground water may be done through a bore well around which a

pit of one meter width may be excavated up to a depth of at least 3.00 m and refilled with stone

aggregate and sand. The filter drain water may be channelled to the refilled pit for recharging the

bore well.

c)

An impervious storage tank of required capacity may be constructed in the setback or any other space

and the rainwater may be channelled to the storage tank. The storage tank may be raised to a

convenient height above the surface and shall always be provided with ventilating the surface and

shall always be provided with ventilating covers and shall have draw-off taps suitably place so that

the rain water may be drawn off for domestic, washing, gardening and such other purposes. The

storage tanks shall be provided with an overflow.

88

d)

The surplus rainwater after storage may be recharged into ground through percolation pits, trenches,

or combination of pits and trenches. Depending on the geomorphologic and topographical condition,

the pits may be of the size of1.20 m width x 1.20 m length x 2.00 m to 2.50 m depth. The trenches

can be or0.60 m width x 2.00 m to 6.00 m length x 1.50 m to 2.00m depth. Terrace water shall be

channelled to pits or trenches. Such pits or trenches shall be backfilled with filter media comprising

the following materials. –

i.

40 mm stone aggregate as bottom layer up to 50% of the depth;

ii.

20 mm stone aggregate as lower middle layer up to 20% of the depth;

iii.

Course sand as upper middle layer up to 20% of the depth;

iv.

A thin layer of fine sand as top layer;

v.

Top 10% of the pits / trenches will be empty and a splash is to be provided in this portion in

such a way that roof top water falls on the splash pad;

vi.

Brick masonry wall is to be constructed on the exposed surface of pits /trenches and the

cement mortar plastered;

vii.

The depth of wall below ground shall be such that the wall prevents lose soil entering into

pits / trenches. The projection of the wall above ground shall at least be 15 cm;

viii.

Perforated concrete slabs shall be provided on the pits / trenches.

e)

If the open space surrounding the building is not paved, the top layer up to a sufficient depth shall

be removed land refilled with course sand to allow percolation of rainwater into ground.

The terrace shall be connected to the open well / bore well / storage tank /recharge pit /trench by means of

H.D.P.E. / P.V.C. pipes through filter media. A valve system shall be provided to enable the first washings

from roof or terrace catchments, as they would contain undesirable dirt. The mouths of all pipes and

opening shall be covered with mosquito (insect) proof wire net

For the efficient discharge of rainwater, there shall be at least two rain water pipes of 100 mm dia. for a roof

area of 100Sq.mRainwater harvesting structures shall be sited as not to endanger the stability of building or

89

earthwork. The structures shall be designed such that no dampness is caused in any part of the walls or

foundation of the building or those of an adjacent building.

The indicative provisions of rainwater harvesting in various buildings types are:

Table 10.2 Provisions for Rainwater harvesting by building types

Category /Use

Area of Plot

(sq.m.)

Provisions to be made

Other Conditions

Residential Plotted Houses

New Proposals

100 and above

Construction of Rain water harvesting

structure

Shall have emphasis on

both storage and re-

use.

Group Housing

New Proposal

All plot sizes

i.

Construction of rain water

harvesting structure.

ii.

Concrete paving to be avoided

and permeable materials are to

be used for all open parking

spaces.

Should

indicate

the

system of Storm Water

Drainage, Rain Water

Harvesting

Structure

and Recharging well.

Public and semi-public buildings

All Proposals

All plot sizes

i.

Shall

have

Rain

water

harvesting

structure

and

storage

ii.

Shall have recharge pits

Shall have emphasis on

both storage and re-

use.

Commercial /Mixed Use

All Proposals

All plot sizes

i.

Construction of Rain water

harvesting structure.

ii.

Soft Landscape provisions and

open spaces with percolation

pits.

iii.

Common treatment plant to be

made part of the integrated

development, funded by sale of

commercial space.

Should

indicate

the

system of storm water

drainage, Rain water

harvesting

structure

and recharging well.

Shall have emphasis on

both storage and reuse.

Industrial

All Proposals

All plot sizes

i.

Construction of Rain water

harvesting structure.

ii.

Soft Landscape provisions and

open spaces with percolation

pits.

iii.

Use of abandoned bore wells

for recharging of ground water.

iv.

Common treatment plant to be

made part of the integrated

development, funded by sale of

commercial space.

Should

indicate

the

system of storm water

drainage, Rain water

harvesting

structure

and recharging well.

Provision

should

be

made

not

to

inject

contaminated

water

into

recharge

structures in industrial

areas and care is to be

taken to keep such

structures away from

sewer

lines,

septic

tanks,

soak

pits,

landfill

and

other

90

sources

of

contamination.

Other proposals

All plot sizes

Similar as above

Similar as above

10.5

Rain Water Harvesting Provisions for Open spaces in cities

The open spaces/recreational land use generally constitute regional parks, district parks, playground

and stadium, sports complex, monument zones, public parking, Plaza and other public open space.

This may be as high as 30% to 50% of the city’s geographic area. All such public open spaces above

the size of 500 Sqm. shall have arrangements for complete utilization and capture of storm water

with scientific rainwater harvesting arrangements.

Following ideas may also be included:

i. Well cum Channel cum Percolation pits.

ii. Use of abandoned bore wells for recharging of ground water

iii. Artificial or natural Storage of storm water runoff from larger sites.

10.6

Ground Water Recharge

Recharging of ground water should be made mandatory not only for residential buildings but for all

types of buildings, including Group Housing Societies having a plot area more than 500 Sqm. and

above. The Ground Water Recharge should also be mandatory for open spaces like parks, parking,

plazas and playgrounds. The harvesting and recharge structures could be constructed by the Local

Authority with the involvement of community-based organizations like Resident Welfare Associations.

10.7

Enforcement and Monitoring

1. The Local Authority shall constitute an Environment Monitoring Cell which will be responsible for

enforcement and monitoring of the provisions of Rainwater Harvesting. The cell shall employ qualified

persons who are well versed with the interpretation of Building Byelaws and responsible for

enforcement as well as monitoring the functioning of the Rainwater Harvesting System.

2. The Local Authority shall include inspection of Rainwater Harvesting Structures before issuing

Completion Certificates or NOCs for service connections to the property.

3. Set an example in the city by ensuring that Rainwater is harvested in the properties assets owned

by them including public buildings, markets, centres, parking spaces, roads and parks etc.

4. The Local Authority shall also establish a mechanism to monitor 100% of RWH provisions in all

the buildings above 1000 Sqm with annual physical verification, while buildings less than 1000 Sqm

can be monitored on the basis of 10% random survey by competent authority.

5. With regard to open public spaces viz., Parks, playgrounds etc. the implementation of provision

rainwater harvesting may be done with the help of Residents Welfare Associations, Community

Building Organization and Non- Governmental Organizations.

6. The Local Authority shall ensure earmarking budgetary provision for the creation and maintenance

of rainwater harvesting structures in public spaces owned and maintained by them, like parking

spaces, parks, plazas etc.

91

7. The practice of incentives and penalties to promote rainwater harvesting shall be as as notified by

the government, considering the water level and scarcity.

CHAPTER 11

11. GREEN BUILDINGS AND SUSTAINABILITY PROVISIONS

Modern buildings consume about 25 to 30 % of total energy, and up to 30 % of fresh potable water, and

generate approximately 40 % of total waste. Sustainable buildings have demonstrated reduction in energy

and water consumption to less than half of the present consumption in conventional buildings, and complete

elimination of the construction and operational waste through recycling.

Thus, all buildings on various plot sizes shall comply with the green norms and conform to the requirements

mandatory for sanction as mentioned in this chapter.

These provisions are not specific to any rating system and are not intended to provide single metric indication

of overall building performance. These provisions allow the practitioners to easily exercise their engineering

judgment in holistically and objectively applying the underlying principles of sustainability to a development

or building facility, considering its functionality and required comfort level.

11.1

Provision for Applicability

The green building provisions are categorised as Mandatory provisions and Optional provisions.

The mandatory provisions shall be applicable to new buildings and existing buildings as follows;

a) New Buildings – The provisions of this Chapter and elsewhere in these Byelaws shall be applicable.

b) Existing Buildings

i) Buildings for which condition for making green building provisions were imposed in the building licence

or in the NOC / Clearance given by MOEF / KSPCB - All such provisions imposed shall be made within 6

months from the date of coming into force of these Byelaws.

The optional provisions are additional provisions over and above the mandatory provisions to achieve better

green rating for the buildings, both existing and new.

In case owners of properties desire to procure green building ratings from one or more rating bodies, they

may suitably incorporate the additional provisions as notified by the Government for the additional

incentives offered therein.

The green building mandatory provisions for new buildings on various plot sizes and construction areas are

indicated in the table 11.1

Table 11.1 Provisions and applicability for various plot sizes and construction areas (Residential and

Non-Residential)

Plot

Category

Applicable plot

area (Sq.m)

Applicable

construction area

(Sq.m)

Provisions

for

Residential

Provisions

for

Non-Residential

I

Upto

100

Any extent

4(a)

4(a)

92

II

Above

100

Upto 250

Above 100

1(a),4(a)

1(a),4(a)

III

251 to 500

101 to 250

1(a),4(a)

1(a),4(a)

251 to 500

1(a),1(b),2(a),4(a)

1(a),4(a)

Above 500

1(a),1(b),2(a),4(a)

1(a),1(b),2(a),4(a)

II

501to1000

101to250

1(a),4(a)

1(a),4(a)

251to500

1(a),1(b),1(d),2(a),

4(a)

1(a),1(d),2(a),4(a)

501to1000

1(a),1(b),1(d),2(a),

4(a)

1(a),1(b),1(d),2(a)

,4(a)

Above1000

1(a),1(b),

1(d),

2(a),3(a),

3(c),4(a)

1(a),1(b),1(d),

2(a),3(a),

3(c),4(a)

III

Above1000

101to250

1(a),4(a)

1(a),4(a)

251to500

1(a),1(b),1(d),2(a),

4(a)

1(a),1(d),2(a),4(a)

501to1000

1(a),1(b),1(d),2(a),

4(a)

1(a),1(b),1(d),2(a)

,4(a)

1001to2000

1(a),1(b),

1(d),

2(a),3(a),

3(c),4(a),4(b), 4(c)

1(a),1(b),

1(d),

2(a),3(a),3(c),4(a),

4(b),

4(c)

2001to5000

1(a),1(b),1(d),2(a),

2(b),

3(a),

3(b),3(c),4(

a),

4(b),

4(c)

1(a),1(b),

1(d),

2(a),2(b),

3(a),3(b),3(c),4(a)

,4(b),

4(c)

Above5000

1(a),1(b),1(c),1(d),

2(a),

2(b),

3(a),3(b),

3(c),4(a),

4(b),4(c)

1(a),1(b),

1(c),

1(d),2(a),2(b),

3(a),3(b),3(c),4(a)

,

4(b),4(c)

*Note: (1) provisions marked 1(a), 2(b) etc. are as per Clause 11.2

(2) Area mentioned above is the total construction area including the car parking area in the building.

The schemes/ projects formulated on the basis of provisions given in Master plan/ Zonal Regulations will require

approval as indicated:

EIA/ ECC (as per MoEF), NBC (latest), ECBC 2007 or latest, BEE Star rating/ LEED / IGBC/ GRIHA of TERI

Certification}

EIA- Environmental Impact Assessment Study Report,

ECC- Environmental Clearance Certificate,

MoEFCC – Ministry of Environment Forest and Climate Change.

93

NBC – National Building Code,

ECBC – Energy Conservation Building Code,

BEE – Bureau of Energy Efficiency,

LEED – Leadership in Energy and Environment Design,

IGBC –Indian Green Building Council,

GRIHA – Green Rating for Integrated Habitat Assessment,

TERI – The Energy and Resources Institute.

The prevailing provisions of the above shall be applicable. However, if there are any modifications in the

same, the modified provisions shall become automatically applicable

11.2

Provisions for Sanction of new buildings

1. Water Conservation and Management

a) Rainwater Harvesting (as detailed in Chapter 10 and as specified in Appendix-XVII)

b) Low Water Consumption Plumbing Fixtures (as specified by the Competent Authority or as notified by the

Government

c) Wastewater Recycle and Reuse (as specified in Appendix-XV)

d) Reduction of Hardscape (detailed at Clause 11.2.1)

2. Solar Energy Utilization

a) Installation of Solar Assisted Water Heating Systems (detailed at Clause 11.2.4). In case of non-residential

buildings, Solar Assisted Water Heating Systems / energy efficient centralised hot water system shall be

adopted only where hot water is required in the building.

b) Installation of Solar Photovoltaic Panels (detailed at Clause 11.2.3)

3. Energy Efficiency (Concept of passive solar design of buildings

a) Low Energy Consumption Electrical Fixtures (Electrical Appliances – BEE Star and Energy Efficient

Appliances) (as specified by the Competent Authority or as notified by the Government)

b) Energy Efficiency in HVAC systems. (as specified by the Competent Authority or as notified by the

Government)

c) Lighting of Common areas by LED devices. (As specified by the Competent Authority or as notified by the

Government

4. Waste Management

a) The Waste Management is categorised into;

i. Liquid Waste Management – Liquid Waste Management in buildings shall be as specified in Clause

No.11.2(1)(c)

ii. Solid Waste Management –

94

Solid Waste Management is further categorised into;

(a) Municipal Solid Waste (MSW) Management – MSW Management during the operation of buildings shall be

as specified in Appendix-XVIII-A.

(b) Construction & Demolition (C&D) Waste Management – C&D Waste Management during the construction,

renovation and demolition of buildings / structures shall be as specified in Appendix-XVIII-B.

11.2.1 Provision for Site level greening

In alignment with National Sustainable Habitat Mission, the Local Authority shall encourage augmentation

of green cover in the plot, by following:

The Urban Greening Guidelines, 2014 and other provisions as given below –

a.

Provision of minimum 1 tree / every 80S.qm of plot area for plot sizes >100 Sqm and planted within

the setback of the plot.

b. Compensatory Plantation for felled/transplanted tress in the ratio 1:3 within the premises under

consideration

c.

Choice of species for plantation in site and abutting the road to be adopted as per Section 8 of the

Urban Green Guidelines, 2014.

d. The unpaved area shall be more than or equal to 20% of the open spaces provided.

11.2.2 Water Re-use and Recycling

The recycled water should be used for flushing, HVAC, cleaning of non-living areas and horticultural

purposes.

11.2.3 Roof Top Solar Energy Installations

Roof top photovoltaic power station, or rooftop PV system, is a photovoltaic system that has its electricity-

generating solar panels mounted on the rooftop of residential or commercial buildings. The various

components of such a system include photovoltaic modules, mounting systems, cables, solar inverters and

other electrical accessories. Rooftop PV systems are faster than other types of renewable power plants. They’re

clean, quiet, and visually unobtrusive.

The norms for Roof Top Solar PV Installation and Generation for residential and non-residential buildings as

per the area standards mentioned in Table 11.1 shall be as follows and in compliance with the requirements

as notified by the Government.

Minimum 5% of the consumed electrical load (excluding the electrical load required for hot water generation

through electrical geysers, if applicable) or7.75 W/Sft (derived @ 12Sqm per 1 KWP as suggested by the

Ministry of New and Renewable energy) for ‘available roof space’, whichever is less.

The estimated consumed power load (at the time of applying for building sanction), to derive the required Roof

Top Solar PV Installation, may be calculated as notified by the government, -these Byelaws, provided that the

Owner / Promoter submits an Affidavit / Undertaking that if the actual consumed load during operation is

more than the estimated power load, the Owner / Promoter shall provide the required additional roof top

Solar PV installation as mentioned above. The Promoter shall be responsible for the initial five years of

operation and the Owners shall be responsible for the remaining period of operation of the building.

95

S.N

o.

Category

of

buildings/area

Area standards

Generation requirement *

Residential

1

Plotted Housing

For HIG Plots

and above

Minimum 5% of connected load or 20W/sqft for

"available roof space"**, whichever is less.

2

Group Housing

All

proposals,

as per Group

Housing

Norms

Minimum 5% of connected load or 20W/sqft for

"available roof space", whichever is less.

All other buildings (Government or Private, defined as per clause 1.16 b to g) (mandatory for buildings

having shadow free rooftop area > 50 sqmt)

3

Educational

Plot size of 500

sqmt

and

above

Minimum 5% of connected load or 20W/sqft for

"available roof space", whichever is less.

4

Institutional

5

Commercial

6

Industrial

7

Mercantile

8

Recreational

Note: ‘Available roof space’ = 70% of total area of roof / terrace, considering 30% area reserved for residents’

amenities.

If solar heating panels are erected on the roof, the same shall be part of the available roof space and the

balance area (after deducting the area covered by solar water heating panels) shall only be considered for

Solar PV panels.

11.2.4 Installation of Solar Assisted Water Heating System and other energy efficient centralised

hot water system in Building

No new building in the categories mentioned in Table 11.1 in which there is a system of installation for

supplying hot water shall be built unless the system of the installation is having an auxiliary solar assisted

water heating system or other permitted centralised hot water system specified in these Byelaws. Wherever

hot water requirement is continuous, auxiliary heating arrangement either with electric elements or oil of

adequate capacity can be provided.

Clearance of plan for the construction of new buildings of the aforesaid categories shall only be given if they

have a provision in the building design itself for an insulated pipeline from the rooftop in the building to

various distribution points where hot water is required. The building must have a provision for continuous

water supply to the solar water heating system or any other energy efficient centralised water heating system,

such as Heat Pump etc. The building should also have open space on the rooftop, which receives direct

sunlight. The load bearing capacity of the roof should at least be 50 kg/Sq. All new buildings of above said

categories must complete installation of solar water heating systems before obtaining necessary licence to

commence their business.

The capacity and specifications of the Solar Assisted Water Heating Systems shall be as specified in these

Byelaws.

Normal electric geysers may also be permitted for hot water generation, provided that additional Solar PV

Installation is done in the building for the additional power consumed for operating such electric geysers,

over and above the Solar PV installation required to be provided as per clause 11.2.3. If the available roof

96

space is not sufficient to provide the additional Roof top solar PV installation equivalent to the additional

power consumed for hot water generation, the shortfall shall be substituted through solar PV installations

elsewhere in the plot or through ‘Off site solar power generation’.

Note: ‘Off site solar power generation’ means the solar power generated outside the plot by the owner /

promoter or purchase of Solar power from third party Solar power generators through a power purchase

agreement made between such agency and the owner / promoter to purchase solar power equivalent to the

shortfall of solar power generation within the plot (required for the additional electric power consumed for hot

water generation).

Specifications: Installation of Solar Assisted Water Heating Systems shallconform to BIS specification IS

12933. The solar collectors used in the systemshall have the BIS certification mark.”

11.2.5 Sustainable Solid Waste Management

Zero Waste is a concept of waste management and planning approaches that emphasize waste prevention

as opposed to end waste management. This means restructuring production and distribution systems,

designing and managing products and processes to systematically follow the 3R rule of Reduce, Re-use and

Re-cycle the volume of waste, to conserve and recover all used resources, and therefore eliminating all

discharges to landfills, and prevent air, water and land pollution.

Zero Waste/ land- fill can be achieved by adopting systematic approach of segregation at source by planning,

by collection facilitation and most importantly by creating public awareness.

The green waste can be converted into fuel cakes, kitchen waste into manure, construction & demolition

waste into bricks, plastic waste into oil, paper, glass and steel back into the same and all residual inert

materials can also be converted into bricks.

The process to be adopted by the Local Authority and the Owner / Promoter of the buildings categorised in

Table 11.1 for Solid waste management shall be as mentioned in Appendix XVIIIA & XVIIIB

11.2.6 Sustainability of Building Materials

Sustainability of natural resources for building materials shall be ensured through conservation of available

natural resources and use of supplementary materials such as industrial/agricultural by-products,

renewable resources, factory-made building components and recycled construction and demolition waste.

Supplementary building materials (derived or processed waste) shall be suitably used in combination with

conventional resources offers dual advantages in purview of health & environmental benefits.

Use of Factory made pre-fab/pre-cast and recycled components with green benefits:

a)

Panels, hollow slabs, hollow blocks–etc. - conservation of materials, less water requirement

b)

Fly Ash bricks, Portland Pozzolana cement, Fly ash concrete, phosphor gypsum-based walling &

roofing panels, particle wood – recycled use of industrial/agricultural by-products. (Ref. Table 14)

c)

Fly ash/ AAC (Autoclaved aerated light weight concrete) panels/ CLC (Cellular light weight concrete)

panels- ensures thermal comfort (significant reduction in air conditioning requirement)

d)

Use of bamboo & rapidly growing plantation timbers- environmental benefits. Local materials are

generally suitable for prevailing geo-climatic conditions & have advantage of low transportation cost

& time. Sustainable use of building materials shall be encouraged which may combine certain

mandatory provisions and incentives.

97

The above provision is not included in the mandatory provisions but to avail additional incentives the

above provision may be adopted.

11.2.7 Sustainable C&D Waste Management

The process to be adopted by the Local Authority and the owner / promoter of the buildings for C&D

waste management shall be as mentioned in Appendix XVIII.

11.3

Various Guidelines for Green Rating System

The

Government

shall

notify

separate

Green

Rating

systems

for

buildings

by

selectively

combining/adopting/amending the provisions between the following guidelines:

1. IGBC guidelines by the Confederation of Indian Industries.

2. GRIHA guidelines by the Ministry of New and Renewable Energy, GoI. In pursuance of the National

Sustainable Habitat Mission on Energy Efficiency in Buildings, the Local Authority shall encourage the

provisions of the following Energy efficiency guidelines by certain mandatory provisions and incentives-

3. LEED Guidelines

4. ECBC guidelines prepared by Bureau of Energy Efficiency, Ministry of Power GoI

5. Model Energy Efficiency guidelines. (NSMH Sub report by Bureau of Energy Efficiency)

98

CHAPTER 12

12. FIRE PROTECTION AND FIRE SAFETY REQUIREMENTS

12.1

Scope

This part covers the requirements of the fire protection for the multi-storeyed buildings (high rise

buildings-as specified by fire department ) and low occupancies of categories such as Assembly,

Institutional, Educational (more than two storeyed and built-up area exceeds 1000Sq.m), Business

(where plot area exceeds 500 Sqm), Mercantile (where aggregate covered area exceeds 750 Sqm),

Hotel, Hospital, Nursing Homes, Underground Complexes, Industrial Storage, Meeting/Banquet

Halls, Hazardous Occupancies.

The requirements of NBC-2016 Part 4. and THE KARNATAKA FIRE FORCE ACT are applicable.

12.2

Procedure for obtaining NOC and Clearance Certificate from DFES

The procedure of obtaining NOC from Department of Fire & Emergency Services (DFES) is detailed in

clause no. 3.10.5 and the procedure of obtaining Clearance Certificate is detailed in Clause no. 3.18

12.3

Renewal of fire clearance

On

the

basis

of

undertaking

given

by

the

Fire

Consultant

/

Architect,

the

Chief

Fire

Officer

shall

renew

the

fire

clearance

in

respect

of

the

following

buildings

on

annual basis: -

1) Public entertainment and assembly

2) Hospitals

3) Hotels

4) Underground shopping complex and all high-rise buildings

12.4 Fee

For augmentation of fire service facilities for effecting rescue/firefighting operation in high rise building, fee

payable to Chief Fire Officer by the applicant(s) along with sets of plans for obtaining the No Objection

Certificate shall be as notified by the Government.

12.5 Responsibility of providing Fire Protection & Fire Fighting Measures

The engaged Licensed Professional of the project shall be responsible for making provisions for fire

protection and firefighting measure as provided in this Chapter

12.6 Terminology

For the purpose of this Chapter all the technical terms shall have the meaning as defined in National

Building Code of India, Part-IV, Fire Protection as amended from time to time but for the terms which

are defined otherwise in these Byelaws.

12.7 General

The DFES may insist on suitable provisions in the buildings from fire safety and means of escape

point of view depending on the occupancy, height or on account of new developments creating special

fire hazard, in addition to the provision of these Building Byelaws and part IV (Fire Protection) of

National Building Code of India, which are not contradicting to the provision of the Zonal Regulations.

99

12.7.1 Fire Resistance of Types of Constructions / Building Components

The fire resistance ratings for various types of construction for structural and non-structural

members shall be as given in Table 1 of Part IV of the NBC, 2016.Building elements/components

such as walls, columns, beams and floors shall have the requisite fire resistance rating in accordance

with the accepted standards at Tables 10 to 26 of Part IV of the NBC.

12.7.2 Means of Access

As provided in Zonal Regulations.

12.7.3 Provisions of Exterior Open Spaces around the building:

As provided in Zonal Regulations

12.7.4 Exit Requirement

As provided in Section 4.2 of Part 4, NBC 2016

As provided in Section 4.2 of Part 4, NBC 2016

Type of Exits: As provided in Section 4.2 of Part 4, NBC 2016

Number of Size of Exits: As provided in Section 4.4.2.1 of Part 4, NBC 2016.

Arrangements of Exits: As provided in Section4.4.2.2 of Part 4, NBC 2016

Occupant Load: As provided in Section 4.3 of Part 4, NBC 2016.

Capacity of Exit: As provided in Section4.4.2.3 of Part 4, NBC 2016

Staircase Requirements: As provided in Section 4.4.2.4.3 of Part 4, NBC 2016.

Minimum Width Provision for Stairways: As provided in Section 4.4.2.4.3.2 of Part 4, NBC 2016

Minimum Width Provision for Passageway/Corridors: As provided in Section 4.4.2.4.2 of Part 4, NBC 2016

Doorways: As provided in Section 4.4.2.4.1of Part 4, NBC 2016

Stairways: As provided in Section 4.4.2.4.3.2 of Part 4, NBC 2016

12.8 Fire Escapes or External Stairs:

1. Fire escape including Occupant load and Travel distance shall not be taken into account while

calculating the number of staircases for a building.

2. All fire escapes shall be directly connected to the ground.

3. Entrance to the fire escape shall be separate and remote from internal staircase.

4. The route to fire escape shall be free of obstructions at all times except the doorway leading to the

fire escape which shall have the required fire resistance.

5. Fire escape shall be constructed of non-combustible materials.

100

6. Fire escape stairs shall have straight flight not less than 125 cm wide with 25cm treads and risers

not more than 19 cm.

7. Handrails shall be at a height not less than 100 cm.

8. Fire escape staircase in the mercantile, business, assembly, hotel buildings above 24 m. height shall

be a fire tower and in such a case width of the same shall not be less than the width of the main

staircase. No combustible material shall be allowed in the fire tower.

12.8.1 Spiral Stairs

1. The use of spiral staircase shall be limited to low occupant load and to building height of9 m.

2. A spiral stair shall not be less than 150 cm in diameter and shall be designed to give the adequate

headroom.

12.8.2 Staircase Enclosures

1. The external enclosing walls of the staircase shall be of the brick or the R.C.C.

Construction having fire resistance of not less than two hours. All enclosed staircases shall have access

through self-closing door of one-hour fire resistance. These shall be single swing doors opening in the

direction of the escape. The door shall be fitted with the check action door closers.

2. The staircase enclosures on the external wall of the building shall be ventilated to the atmosphere at

each landing.

3. Permanent vent at the top equal to the 5% of the cross-sectional area of the enclosure and openable

sashes at each floor level with area equal to 1 to 15% of the cross-sectional area of the enclosure on

external shall be provided. The roof of the shaft shall be at least 1 m. above the surrounding roof.

There shall be no glazing or the glass bricks in any internal closing wall of staircase. If the staircase

is in the core of the building and cannot be ventilated at each landing, a positive of 5-mm. e.g. by

electrically operated blower/blowers shall be maintained.

4. The mechanism for pressurizing the staircase shaft shall be so installed that the same shall operate

automatically on fire alarm system/sprinkler system and be provided with manual operation

facilities.

12.8.3 Ramps

1. Ramps of slope of not more than 1 in 8 may be substituted for and shall comply with all the applicable

requirements of all required stairways as to enclosure capacity and limiting dimensions. Larger slopes

shall be provided for special uses but in no case greater than 1 in 8. For all slopes steeper than 1 in

10 and where the use is such as to involve danger of slipping, the ramp shall be surfaced with

approved non-slipping material.

2. The minimum width of the ramps in the Hospitals shall be 3.5 m. and, in the basement, using car

parking shall be 6.0 m or as specified in the Zonal Regulations.

3. Handrails shall be provided on both sides of the ramp.

4. Ramp shall lead directly to outside open space at ground level or courtyards of safe place.

5. For building above 24.0 m. in height, access to ramps from any floor of the building shall be through

smoke fire check door.

101

6. In case of nursing homes, hospitals etc. area exceeding 300Sq.m at each floor one of the exit facility

shall be a ramp of not less than 3.5 m. in width.

12.9 Provision of lifts

1) Provision of the lifts shall be made for all multi-storeyed building having a height of 15.0 m. and above.

2) All the floors shall be accessible for 24 hours by the lift. The lift provided in the buildings shall not be

considered as a means of escape in case of emergency.

3) Grounding switch at ground floor level to enable the fire service to ground the fire man lift car in case of

emergency shall also be provided.

4) The lift machine room shall be separate and no other machinery be installed in it.

5) The Karnataka Lifts Escalators and Passenger Conveyors Act,2012 shall also be complied with.

12.9.1 Lift Enclosure / Lift

General requirements shall be as follows

a)

Walls of lift enclosures shall have a fire rating of two hours. Lift shafts shall have a vent at the top of

area not less than 0.2 Sqm

b)

Lift motor room shall be located preferably on top of the shaft and separated from the shaft by the

floor of the room (not applicable for machine room less lifts).

c)

Landing door in lift enclosures shall have a fire resistance of not less than one hour.

d)

The number of lifts in one lift bank shall not exceed four. A wall of two hours fire rating shall separate

individual shafts in a bank.

e)

Lift car door shall have a fire resistance rating of 1 hour.

f)

For buildings 15.0 m. and above in height, collapsible gates shall not be permitted for lifts and solid

doors with fire resistance of at least one hour shall be provided.

g)

If the lift shaft and lobby is in the core of the building a positive pressure between 25 and 30 pa shall

be maintained in the lobby and a possible pressure of 50 pa shall be maintained in the lift shaft. The

mechanism for the pressurization shall act automatically with the fire alarm/sprinkler system and it

shall be possible to operate this mechanically also.

h) Exit from the lift lobby, if located in the core of the building, shall be through a self-closing fire smoke

check door of one-hour fire resistance.

i)

Lift shall not normally communicate with the basement. If, however, lifts are in communication, the

lift lobby of the basement shall be pressurized as in (g) with self-closing door as in (h).

j)

Grounding switch (es), at ground floor level shall be provided to enable the fire service to ground the

lifts.

k)

Telephone/talk back communication facilities may be provided in lift cars for communication system

and lifts shall be connected to the fire control room of the building.

102

l)

Suitable arrangements such as providing slope in the floor of the lift lobby shall be made to prevent

water used during firefighting, etc. at any landing from entering the lift shafts.

m) A sign shall be posted and maintained on every floor at or near the lift indicating that in case of fire,

occupants shall use the stairs unless instructed otherwise. The sign shall also contain a plan for each

floor showing the location of the stairways. Floor marking shall be done at each floor on the wall in

front of the lift-landing door.

n) Alternate power supply shall be provided in all the lifts.

12.9.2 Fire Lift

Following details shall apply for a fire lift in addition to above requirements:

a)

To enable fire service personnel to reach the upper floors with the minimum delay, one or more of the

lifts shall be so designed so as to be available for the exclusive use of the fireman in an emergency

and be directly accessible to every dwelling/lettable floor space on each floor.

b)

The lift shall have a floor area of not less than 1.4 Sqm It shall have a loading capacity of not less

than 545 kg. (8 persons lift) with automatic closing doors.

c)

The electric supply shall be on a separate service from electric supply mains in a building and the

cables run in a route safe from fire that is within a lift shaft. Lights and fans in the elevator having

wooden panelling or sheet steel construction shall be operated on 24-volt supply.

d)

In case of failure of normal electric supply, it shall automatically switch over to the alternate supply.

For apartment houses, this changeover of supply could be done through manually operated

changeover switch. Alternatively, the lift should be so wired that in case of power failure, it comes

down at the ground level and comes to stand still with door open.

e)

The operation of a fire lift shall by a single toggle of two-button switch situated in a glass-fronted box

adjacent to the lift at the entrance level. When the switches on landing; call points will become

inoperative and the lift will be on car control only or on a priority control device. When the switch is

off, the lift will return to normal working. This lift can be used by the occupants in normal times.

f)

The words ‘F1RE LIFT’ shall be conspicuously displayed in fluorescent paint on the lift landing doors

at each floor level.

g)

The speed of the fire lift shall be as specified in NBC 2016.

Buildings of Height as per requirement of fire department and above clause 7.1.1 sub clause (x)

Operational requirements of fireman’s Lift of NBC 2016 is applicable

12.10 Basement

As provided in Clause 5.1.9 and 6.4.5of these Building Byelaws.

12.10.1 Requirements

1)

The access to the basement shall be either from the main or alternate staircase providing access

and exit from higher floors. Where the staircase is continuing, the same shall be enclosed type

serving as a fire separation from the basement floor and higher floors. Open ramps shall be

permitted if they are constructed within the building line subject to the provision of the (iv).

103

2)

In case of basement for office, sufficient number of exit ways and access ways shall be provided

with a travel distance not more than 15.0 m. The travel distance in case of dead-end shall be 7.5

m.

3)

All floors shall be compartmented/zoned with area of each compartment being not more than

750 m2. The maximum size of the compartment shall be as follows in case of sprinklered

basement/building.

SI

No.

Use

Compartmentation

Area (m²)

i)

Basement car parking

3,000

ii)

Basements (other than car

parking)

2,000

iii)

Institutional buildings:

Subdivision C-1

1,800

iv)

Institutional buildings:

Subdivision C-2 and C-3

1,125

v)

Mercantile and assembly

buildings

2,000

vi)

Business buildings

3,000

vii)

All other buildings (excluding

low hazard and moderate

hazard industrial buildings and

storage buildings)

750

Each compartment shall have ventilation standards as laid down in Bye-Laws separately and independently.

The partition shall be made in consultation with Chief Fire Officer.

4)

The first basement (fully below ground level) can be used or services/parking/other permissible

services. Lower basements, if provided, shall exclusively be used for the uses permitted in the

Zonal Regulations only.

5)

Each basement shall be separately ventilated. Vents with cross-sectional area(aggregate) not less

than 2.5 percent of the floor area spread evenly round the perimeter of the basement shall be

provided in the form of grills or breakable starboard lights or pavement lights or by way of shafts.

Alternatively, a system of air inlets shall be provided at basement floor level and smoke outlets

at basement ceiling level. Inlets and extracts may be terminated at ground level with starboard

or pavement lights as before. But ducts to convey fresh air to the basement floor level have to be

laid. Starboard and pavement lights should be in positions easily accessible to the firemen and

clearly marked ‘SMOKE

OUTLET’ or ‘AIR INLET’ with an indication of area served at or near the opening.

6)

The staircase of basement shall be of enclosed type having fire resistance of not less than two

hours and shall be situated at the periphery of the basement to be entered at ground level only

from the open air and in such positions that smoke from any fire in the basement shall not

obstruct any exit serving the ground and upper stories of the building and shall communicate

with basement through a lobby provided with fire resisting self-closing door of one hour rating.

In case of basement being used as car parking only, the travel distance shall be 45 m

7)

In multi-storeyed basements, intake duct may serve all basements levels, but each basement and

basement compartment shall have separate smoke outlet duct or ducts. Mechanical extractors

for smoke venting system from lower basement levels shall also be provided. The system shall be

104

of such design as to operate on actuation of smoke, heat sensitive detectors/sprinklers, if

installed, and shall have a considerably superior performance compared to the standard units.

It shall also have an arrangement to start it manually.

8)

Mechanical extractors shall have an internal locking arrangement so that extractors shall

continue to operate and supply fans shall stop automatically with the actuation of fire detectors.

Mechanical extractors shall be designed to permit 30 air changes per hour in case of fire or

distress call. However, for normal operation, only 30 air changes or any other convenient factor

can be maintained.

9)

Mechanical extractors shall have an alternate source of power supply.

10) Ventilating ducts shall be integrated with the structure and made out of brick masonry or RCC

as far as possible and when this duct crosses the transformer area of electrical switchboard, fire

dampers shall be provided.

11) Kitchens working on gas fuel shall not be permitted in basement/sub-basement.

12) If cut-outs are provided from basement to the upper floors or to the atmosphere, all side cut-out

openings in the basements shall be protected by sprinkler headset closed spacing so as to form

a water curtain in the event of a fire.

13) Dewatering pump shall be provided in all bases.

12.11 Provision of helipad

All high-rise buildings of height 200 m. and above shall have provision for a Helipad as per clause no

6.5.8 of the Byelaws. The same shall be approved by the Authority.

12.12 Service ducts/refuge chute

a)

Service duct shall be enclosed by walls and door, if any, of 2 hours fire rating. If ducts are larger than

10 Sqm the floor should seal them, but provide suitable opening for the pipes to pass through, with

the gaps sealed.

b)

A vent opening at the top of the service shaft shall be provided between one fourth and one-half of

the area of the shaft. Refuge chutes shall have an outlet at least of wall of non-combustible material

with fire resistance of not less than two hours. They shall not be located within the staircase enclosure

or service shafts or air-conditioning shafts. Inspection panel and door shall be tight fitting with 1

hour fire resistance; the chutes should be as far away as possible form exits.

c)

Refuse chutes, if any provided in a building, shall have opening at least 1 m above roof level for

venting purpose and they shall have an enclosure wall of non-combustible material with fire

resistance of not less than 120 min. They shall not be located within the staircase enclosure or service

shafts, or air conditioning shafts. Refuse chutes inspection panel and doors shall be tight fitting with

60 min fire resistance. Sprinkler protection system shall be provided for the refuse chutes. Refuse

chutes shall be at least 6 m away from exits.

12.13 Electrical services

Electrical Services shall conform to the following:

a)

The electric distribution cables/wiring shall be laid in a separate duct shall be sealed at every floor

with non-combustible material having the same fire resistance as that of the duct. Low and medium

voltage wiring running in shaft and in false ceiling shall run in separate conduits.

105

b)

Water mains, telephone wires, inter-com lines, gas pipes or any other service lines shall not be laid

in ducts for electric cables.

c)

Separate conduits for water pumps, lifts, staircases and corridor lighting and blowers for pressuring

system shall be directly from the main switch panel and these circuits shall be laid in separate

conduit pipes, so that fire in one circuit will not affect the others. Master switches controlling essential

service circuits shall be clearly labelled.

d)

The inspection panel doors and any other opening in the shaft shall be provided with airtight fire

doors having fire resistance of not less than 1 hour.

e)

Medium and low voltage wiring running in shafts and within false ceiling shall run in metal conduits.

Any 230-voltage wiring for lighting or other services, above false ceiling should have 660V grade

insulation. The false ceiling including all fixtures used for its suspension shall be of non-combustible

material.

f)

An independent and well-ventilated service room shall be provided on the ground floor with direct

access from outside or from the corridor for the purpose of termination of electrical supply from the

licenses service and alternative supply cables. The doors provided for the service room shall have fire

resistance of not less than 2 hours.

g)

Miniature circuit breakers (MCB) and Earth leakage circuit breaker (ELCB)shall be provided for

electrical circuit.

12.14 Staircase and corridor lights

The staircase and corridor lighting shall be on separate circuits and shall be independently connected so that

it could be operated by one switch installation on the ground floor easily accessible to firefighting staff at any

time irrespective of the position of the individual control of the light points, if any. It should be of miniature

circuit breaker type of switch so as to avoid replacement of fuse in case of crisis.

a)

Staircase and corridor lighting shall also be connected to alternate source of power supply.

b)

Suitable arrangement shall be made by installing double throw switches tonsure that the lighting

installed in the staircase and the corridor does not get connected to two sources of supply

simultaneously. Double throw switch shall be installed in the service room for terminating the stand

by supply.

c)

Emergency lights shall be provided in the staircase and corridor.

12.15 Air-conditioning

1)

Air- conditioning system should be installed and maintained so as to minimize the danger of spread

of fire, smoke or fumes thereby from one floor of fire area to another or from outside into any occupied

building or structure. –

2)

Air -Conditioning systems circulating air to more than one floor area should be provided with dampers

designed to close automatically in case of fire and thereby prevent spread of fire or smoke. Such a

system should also be provided with automatic controls to stop fans in case of fire, unless arranged

to remove smoke from a fire, in which case these should be designed to remain in operation.

3)

Air- conditioning system serving large places of assembly (over one thousand persons), large

departmental stores, or hostels with over 100 rooms in a single block should be provided with effective

means for preventing circulation of smoke through the system in the case of fire in air filters or from

other sources drawn into the system even though there is insufficient heat to actuate heat smoke

106

sensitive devices controlling fans or dampers. Such means shall consist of approved effective smoke

sensitive controls.

12.15.1 Details to be conformed for Air- Conditioning

Air-conditioning should conform to the following:

a)

Escape routes like staircase, common corridors, lift lobbies; etc. should not bemuse as return air

passage.

b)

The ducting should be constructed of metal in accordance with BIS 655:1963

c)

Wherever the ducts pass through fire walls or floor, the opening around the ducts should be sealed

with fire resisting material of same rating as of walls/floors.

d)

Metallic ducts should be used even for the return air instead of space above the false ceiling.

e)

The material used for insulating the duct system (inside or outside) should be of flame resistant (IS

4355: 1977) and non- conductor of heat.

f)

Area more than 750 Sqm on individual floor should be segregated by a firewall and automatic fire

dampers for isolation should be provided.

g)

In case of more than one floor, arrangement by way of automatic fire dampers for isolating the ducting

at every floor from the floor should be made. Where plenums used for return air passage, ceiling and

its features and air filters of the air handling units, these should be flame resistant. Inspection panels

should be provided in the main trenching. No combustible material should be fixed nearer than 15

cm. to any duct unless such ducting is properly enclosed and protected with flame resistant material

h) In case of buildings more than 24 m. in height, in non-ventilated lobbies, corridors, smoke extraction

shaft should be provided.

12.15.2 Fire Dampers

1. These shall be located in air ducts and return air ducts/passages at the following points:

a) At the fire separation wall.

b) Where ducts/passages enter the central vertical shaft.

c) Where the ducts pass through floors.

d) At the inlet of supply air duct and the return air duct of each compartment on every floor.

2. The dampers shall operate automatically and shall simultaneously switch off the air- handling fans.

Manual operation facilities shall also be provided.

Note: For blowers, where extraction system and dust accumulators are used, dampers shall be provided.

3. Fire/smoke dampers (for smoke extraction shafts) for building more than 24 m height.

For apartment houses in non-ventilated lobbies/corridor operated by detection system and manual

control sprinkler system. For other buildings, on operation of smoke/heat detection system and

manual control/sprinkler system.

107

4.

Automatic fire dampers shall be so arranged so as to close by gravity in the direction of air movement

and to remain tightly closed on operation of a fusible link.

12.16

Boiler Room

Provisions of boiler and boiler rooms shall conform to Indian Boiler Act, 2007.

Further, the following additional aspects may be taken into account in the location of boiler/ boiler room –

a)

The boiler shall not be allowed in sub-basement, but may be allowed in the basement away from the

escape routes.

b)

The boilers shall be installed in a fire resisting room of 4 hours’ fire resistance rating, and this room

shall be situated on the periphery of the basement. Catch pits shall be provided at the low level.

c)

Entry to this room shall be provided with a composite door of 2 hours’ fire resistance.

d)

The boiler room shall be provided with fresh air inlets and smoke exhaust directly to the atmosphere.

e)

The furnace oil tank for the boiler if located in the adjoining room shall be separated by fire resisting

wall of 4 hours rating. The entrance to this room shall be provided with double composite doors. A

curb of suitable height shall be provided at the entrance in order to prevent the flow of oil into boiler

room in case of tank rupture.

f)

Foam inlets shall be provided on the external walls of the building near the ground level to enable

the fire services to use foam in case of fire.

Clause 3.4.9 Heating; clause 4.8 Hazardous Areas, Gaseous, Oil Storage Yard, etc of Part-4 of NBC

2016 is applicable.

12.17

Alternate source of electric supply

A stand by electric generator shall be installed to supply power to staircase and corridor lighting circuits,

lifts detection system, fire pumps, pressurization fans and bowlers, Public Address (PA) system, exit sign,

smoke extraction system, Emergency lighting, Fire alarm system, Fireman's lifts (including all lifts),

Lighting in fire command center and security room, magnetic door hold open devices, Pressurization and

smoke venting in case of failure of normal electric supply. The generator shall be capable of taking starting

current of all the machines and circuits stated above simultaneously. If the standby pump is driven by

diesel engine; the generator supply need not be connected to the standby pump. The generator shall be

automatic in operation Diesel generator set(s) shall not be installed at any floor other than ground first

basement.

12.18

Safety measures in electric sub-station

1)

Clear independent approach to the sub-station from outside the building shall be made available

round the clock.

2)

The approaches/corridors to the sub-station area shall be kept clear for movement of men and

material at all times.

3)

The sub-station space is required to be provided with proper internal lighting arrangements.

4)

In addition to natural ventilation proper ventilation to the sub-station area is to be provided by grill

shutters and exhaust fans at suitable places so as to discharge all smoke from the sub-station

without delay in case of fire so that sub-station operations can be carried out expeditiously.

108

5)

Cable trenches of 0.6 m. X 0.6 m. dummy floor of 0.6 m. depth shall be provided to facilitate laying

of cable inside the building for connecting to the equipment.

6)

Steel shutters of 8’X 8’ with suitable grills shall be provided for transformers and sub-station room.

7)

The floor of the sub-station should be capable of carrying 10 tons of transformer weight on wheels.

8)

Built up substation space is to be provided free of cost.

9)

Sub-station space should be clear from any water, sewer, air conditioning, and gas pipe or telephone

services. No other service should pass through the sub-station space or the cable trenches.

10) Proper ramp with suitable slope may be provided for loading and unloading of the equipment and

proper approach will be provided.

11) RCC pipes at suitable places as required will be provided for the cable entries to the sub-station space

and making suitable arrangement for non-ingress of water through these pipes.

12) The sub-station space is to be provided in the approved/sanctioned covered area of the building.

13) Any other alteration /modification required while erection of the equipment will be made by the Owner

/ builder at site as per requirement.

14) Adequate arrangement for fixing chain pulley block above the fixing is available for load of 15 tons.

15) Provision shall be kept for the sumps so as to accommodate complete volume of transformer oil,

which can spill over in the event of explosion of the transformer in the basement of the building.

Sufficient arrangement should exist to avoid fire in the sub-station building from spread of the oil

from the sumps.

16) Arrangement should be made for the provision of fire-retardant cables so as to avoid chances of

spread of fire in the sub-station building.

17) Sufficient pumping arrangement should exist for pumping the water out, in case of fire so as to ensure

minimum loss to the switchgear and transformer.

18) No combustible material should be stacked inside the substation premises or in the vicinity to avoid

chances of fire.

19) It should be made mandatory that the promoters of the multi-storeyed building should get substation

premises inspected once a year to get their license revalidated for the provision of electric supply from

Electricity Board so that suitable action can be taken against the Owner / Builder in case of non-

implementation of Byelaws.

20) The sub-station must not be located below the 1st basement and above the ground floor.

21) The sub-station space should be totally segregated from the other areas of the basement by fire

resisting wall. The ramp should have a slope of 1:10 with entry room ground level. The entire Sub-

station space including the entrance in ground floor is handed over to the licensee of electricity free

of cost and rent.

22) The sub-station area shall have a clear height of 15 feet (4.5 m.) below beams. Further the Sub-

station area will have level above the rest of basement level by 2 feet.

23) It is to be ensured that the Sub-station area is free of seepage / leakage of water.

109

24) The licensee of electricity will have the power to disconnect the supply of the building in case of

violation of any of the above points. However, provision of emergency lights has to be made in the

sub-station for emergency operations.

25) Electric sub-station enclosure must be completely segregated with 4-hoursfire rating wall from

remaining part of basement.

26) The sub-station should be located on periphery /sub-basement and (not aboveground floor).

27) Additional exit shall be provided if travel distance from farthest corner tramp is more than l5 m.

28) Perfect independent vent system 30 air changes per hour linked with detection as well as automatic

high velocity water spray system shall be provided.

29) All the transformers shall be protected with Nitrogen Injection System Carbon Dioxide total flooding

system in case of oil filled transformer. In addition to this, manual control of auto high velocity spray

system for individual transformers shall be located outside the building at ground floor.

30) Suitable arrangement for pump house, water storage tanks with main electrical pump and a diesel-

operated pump shall be made if no such arrangement is provided in the building. In case the water

pumping facilities are existing in the building for sprinkler system, the same should however be

utilized for high velocity water spray system. Alternatively, automatic CO2 total flooding system shall

be provided with manual controls outside the electric sub-station.

31) System shall have facility to give an audio alarm in the basement as well as at the control room.

32) Fire control room shall be manned round the clock.

33) The electric sub-station shall have electric supply from alternate source for operation of vent System

lighting arrangements.

34) Cable trenches shall be filled with sand.

35) Partition walls shall be provided between two transformers as per the rules.

36) Electric control panels shall be segregated.

37) Exits from basement electric substation shall have self-closing fire smoke check doors of 2-hours

fire rating near entry to ramp.

38) All openings to lower basement or to ground floor shall be sealed properly.

39) Yearly inspection shall be carried out by electrical load sanctioning Authority.

40) Ramp to be designed in a manner that in case of fire no smoke should enter the main building.

41) Electric sub-station transformer shall have clearance on all sides as per BBL/relevant electric rules.

42) Other facility will be as per Building Byelaws and relevant electric rules.

43) Rising electrical mains shall consist of metal bus bars suitably protected from safety point of view.

44) Oil less transformer shall be preferred. If the sub-station is located in basement / ground floor of the

main building, the transformers shall be essentially of dry type. In case of dry type transformer room

with wall enclosure is not essential.

110

Note: The sub-station installations shall be carried out in conformity with the local fire regulations and

rules there under wherever they are in force. At other places NBC guidelines shall be followed.

12.19

Fire protection requirements

Buildings shall be planned, designed and constructed to ensure fire safety and thissha1l be done in

accordance with part IV Fire Protection of NBC, 2016 of India, unless otherwise specified in the Zonal

Regulations and these Byelaws. In the case of High-Rise buildings NOC &Clearance Certificate has

to be obtained from DFES.

12.19.1 First Aid /Fixed Fire Fighting /Fire Detection Systems and other Facilities

Provision of fire safety arrangement for different occupancy from Sl. No. 1 to 23 as indicated below shall be

as per Annexure ‘B-I’ ‘B-II’ & ‘B-III’.

1)

Access

2)

Wet Riser

3)

Down Comer

4)

Hose Reel

5)

Automatic Sprinkler System

6)

Yard Hydrant

7)

U.G. Tank with Draw off Connection

8)

Terrace Tanks

9)

Fire Pump

10) Terrace Pump

11) First Aid Fire Fighting Appliances

12) Auto Detection System

13) Manual operated Electrical Fire Alarm System

14) P.A System with talk back facility

15) Emergency Light

16) Auto D.G. Set

17) Illuminated Exit Sign

18) Means of Escape

19) Compartmentation

20) MCB /ELCB

21) Fire Man Switch in Lift

111

22) Hose Boxes with Delivery Hoses and Branch

23) Pipes Refuge Area

12.19.1.1

Note for Annexure ‘B-I’ ‘B-II’ & ‘B-III’

1)

Where more than one riser is required because of large floor area, the quantity of water and pump

capacity recommended in these Annexure should be finalized in consultation with Chief Fire Officer.

2)

The above quantities of water shall be exclusively for firefighting and shall note utilized for domestic

or other use.

3)

A facility to boost up water pressure in the riser directly from the mobile pump shall be provided in

the wet riser, down comer system with suitable fire service inlets (collecting head) with 2 to 4 numbers

of 63 mm inlets for 100-200 mm dia. main, with check valve and a gate valve.

4)

Internal diameter of rubber hose for reel shall be minimum 20 mm. A shut off branch with nozzle of

5 mm. size shall be provided.

5)

Fire pumps shall have positive suctions. The pump house shall be adequately ventilated by using

normal/mechanical means. A clear space of 1.0 m. shall be kept in between the pumps and enclosure

for easy movement/maintenance. Proper testing facilities and control panel etc. shall be provided.

6)

Unless otherwise specified in Byelaws, the firefighting equipment’s/ installation shall conform to

relevant Indian Standard Specification.

7)

In case of mixed occupancy, the firefighting arrangement shall be made as per the highest class of

occupancy, unless fire separation walls are provided between different occupancies.

8)

Requirement of water based first aid fire extinguishers shall be reduced to half if hose reel is provided

in the building.

12.20

Static water storage tank

a)

A satisfactory supply of water exclusively for the purpose of firefighting shall always be available in

the form of underground static storage tank/ Overhead tank with capacity specified in NBC 2016

with arrangements of replenishment by town’s main or alternative source of supply @ 1000 liters per

minute. The static storage water supply required for the above-mentioned purpose should entirely be

accessible to the fire tenders of the local fire service. Provision of suitable number of manholes shall

be made available for inspection repairs and insertion of suction hose etc. The covering slab shall be

able to withstand the vehicular load of 45 tons in case of high rise and 22 tons in case of low-rise

buildings. A draw off connection shall be provided. The slab need not strengthened if the static tank

is not located in mandatory driveway required around the building.

b)

To prevent stagnation of water in the static water tank the suction tank of the domestic water supply

shall be fed only through an over flow arrangement to maintain the level therein at the minimum

specified capacity.

c)

The static water storage tank shall be provided with a fire brigade inlet of 63mm dia. instantaneous

male inlets arranged in a valve box with a suitable fixed pipe not less than 15 cm dia. to discharge

water into the tank. Number of inlets shall be as specified in NBC. This arrangement is not required

where down comer is provided.

112

12.21

Automatic sprinklers

Automatic sprinkler system shall be installed in the following buildings:

a)

All buildings of 24 m. and above in height, except group housing and 45m and above in case of

apartment /group housing society building.

b)

Hotels below 15 m. in height and above 1000 Sqm built up area at each floor and or if basement is

existing.

c)

All hotels, mercantile and institutional buildings above15 m.

d)

Underground Shopping Complex.

e)

Underground car / scooter parking /enclosed car parking.

f)

Any special hazards where the Chief Fire Officer considers it necessary.

g)

For buildings, up to 24 m. in height where automatic sprinkler system is not mandatory as per these

Byelaws, if provided with sprinkler installation following relaxation may be considered.

i.

Automatic heat/smoke detection system and M.C.P. need not be insisted upon.

ii.

The number of Fire Extinguisher required shall be reduced by half.

Automatic sprinkler system requirement in the buildings should comply as per NBC 2016 PART 4 Table 7

Minimum requirements for firefighting equipments.”

12.22

Fixed Carbon di-oxide /Foam/DCO water spray extinguishing system

Fixed extinguishing installations shall be provided as per the relevant specifications in the premises

where use of above extinguishing media is considered necessary by the Chief Fire Officer.

12.23

Fire alarm system

1)

The requirements of fire detection systems in buildings should be followed as per Table 7 PART 4

FIRE AND LIFE SAFETY of NBC 2016. ( As per requirement of fire department ) All residential

buildings like dwelling houses (including flats) boarding houses and hostels shall be equipped with

manually operated electrical fire alarm system with one or more call boxes located at each floor. The

location of the call boxes shall be decided after taking into consideration their floor without having to

travel more than the distance specified in NBC.

2)

The call boxes shall be of the break glass type without any moving parts, where the call is transmitted

automatically to the control room without any other action on the part of the person operating the

call boxes.

3)

All call boxes shall be wired in a closed circuit to a control panel in a control room, located as per

Byelaws so that the floor number from where the callbox is actuated is clearly indicated on the control

panel. The circuit shall also include one or more batteries with a capacity of 48 hours normal working

at full load. The battery shall be arranged to be a continuously trickle charged from the electric mains.

4)

The call boxes shall be arranged to sound one or more sounders so as to ensure that all occupants

of the floor shall be warned whenever any call box is actuated.

113

5)

The call boxes shall be so installed that they do not obstruct the exit ways and yet their location can

easily be noticed from either direction. The base of the call box shall be at a height of 1.5 m. from the

floor level.

6)

All buildings other than as indicated above shall, in addition to the manually operated electrical fire

alarm system, be equipped with an automatic fire alarm system.

7)

Voice evacuation systems shall employ Hindi, English and vernacular language using prerecorded

messages and integrate with fire alarm panels for alerting the zone of fire and surrounding

zones/floors as required for annunciation (see also Table 7 and its Note 1).

8)

Appropriate visual warning arrangement through visual strobes/beacons may be considered in

appropriate situations particularly in public buildings, at required locations to ensure visual as well

as alarm for persons with hearing impairment.

9)

For assembly buildings, institutional buildings and all buildings above 30 m in height where fire

alarm system is provided in accordance to Table 7, detectors shall also be provided inside the

electrical shafts, and lift machine rooms, etc, besides occupancy areas.

10) Fire alarm panels shall be connected in peer-to-peer network or with redundant cables, run in

different shafts. Each panel shall be able to work in standalone mode and master slave architecture

may be used where required.

11) Fire detection and alarm systems in buildings shall be so planned and programmed so as to enable

operations of various systems and equipment to facilitate requirements leading to life safety,

compartmentation

and

fire

protection.

These

systems

and

equipment

may

include

electromechanical systems such as air handling units; pressurization systems; smoke management

systems; creation of compartmentation through the release of fire barrier, hold-up fire doors, etc;

and monitoring of fire water storage tanks and pumps, pressures in hydrant and sprinkler system,

etc. These planning and requirements shall be based on building occupancy and other

requirements on case-to-case basis.

12) Automatic detection system shall be installed in accordance with the relevant standard specifications.

In buildings where automatic sprinkler system is provided, the automatic detection system may not be

insisted upon unless decided otherwise by the Chief Fire Officer

Note: The installation of Fire Alarm Systems shall be carried out in conformity with the local fire

regulations and rules, there under whenever they are in force and the provisions in local Byelaws, if

any. Several types of fire detectors are available in the market, but the application of each type is

limited and has to be carefully considered in relation to the type of risk and the structural features

of the building where they are to be installed.

12.24

Control Room

There shall be a control room on the entrance floor of the building with communication system

(suitable public-address system) to all floors and facilities for receiving the message from different

floors. Details of all floor plans along with the details of firefighting equipment and installation shall

be maintained in the Control Room. The Control Room shall also have facility to detect the fire on

any floor through indicator boards connecting fire detection and alarm system on all floors. The staff

in charge of the Control Room shall be responsible for the maintenance of the various services and

firefighting equipment and installation. The Control Room shall be manned round the clock by trained

firefighting staff.

a) Fire command centre shall be on the entrance floor of the building having direct access. The control

room shall have the main fire alarm panel with communication system (suitable public address

system) to aid floors and facilities for receiving the message from different floors.

b) Fire command centre shall be constructed with 120 min rating walls with a fire door and shall be

provided with emergency lighting. Interior finishes shall not use any flammable materials. All controls

and monitoring of fire alarm systems, pressurization systems, smoke management systems shall

114

happen from this room. Monitoring of integrated building management systems, CCTVs or any other

critical parameters in building may also be from the same room.

c) Details of all floor plans along with the details of firefighting equipment and installations (2 sets

laminated and bound) shall be maintained in fire command centre.

d) The fire staff in charge of the fire command centre shall be responsible for the maintenance of the

various services and firefighting equipment and installations in coordination with security, electrical

and civil staff of the building.

12.25

Fire drills and fire orders

The guidelines for fire drill and evacuation etc. for high-rise building may be seen in NBC 2016 part

IV. All such buildings shall prepare the fire orders duly approved by the Chief Fire Officer.

A qualified fire officer and trained staff shall be appointed for the following buildings:

a)

All high-rise buildings above 30 m. in height where covered area of one floor exceeds 1000 Sqm except

apartments / group housing.

b)

All hotels identified under classification 3 star and above category by Tourism Department and all

hotels above 15 m. in height with 150 beds capacity or more without star category.

c)

All hospital building of 15 m. and above or having number of beds exceeding100.

d)

Underground shopping complex where covered area exceeds 1000 Sqm

e)

All high hazard industries.

f)

Any other risk which Chief Fire Officer considers necessary.

g)

Fire drills shall be conducted, in accordance with the Fire Safety Plan, at least once every three

months for buildings during the first two years. Thereafter, fire drills shall be conducted at least once

every six months.

h) All occupants of the building shall participate in the fire drill. However, occupants of the building,

other than building service employees, are not required to leave the floor or use the exits during the

drill.

i)

A written record of such drills shall be kept on the premises for a three years period and shall be

readily available for fire brigade inspection.

The lightening protection warning light (red) for high-rise buildings shall be provided in accordance with

the relevant standard. The same shall be checked by electrical department.

12.26

Material used for construction of building

1)

The combustible/flammable material shall not be used for partitioning, wall panelling, false

ceiling etc. Any material giving out toxic gases/smoke if involved in the fire shall not be used

for partitioning of a floor or wall panelling or a false ceiling etc. The surface frames spread of

the lining material shall conform to class- I of the standard specification. The framework of

the entire false ceiling would be provided with metallic sections and no wooden framework

shall be allowed for panelling/false ceiling.

115

2)

Construction features/elements of structures shall conform to National Building Code and

BIS code.

12.27

Liquefied Petroleum Gas (LPG)

The

use

of

LPG

shall

not

be

permitted

in

the

high-rise

building

except

residential/hotel/hostel/kitchen/pantry (if any) and shall be located at the periphery of the

building on the ground level.

Fire suppression system and leakage detection system needs to be installed whenever

cooking appliances are using LPG in commercial kitchen.

12.28

House keeping

A high standard of housekeeping must be insisted upon by all concerned. There must be no laxity in this

respect. It must be borne in mind that fire safety independent to a large extent upon good housekeeping.

12.28.1 Details for Good Housekeeping: -

Good Housekeeping includes the following:

a)

Maintaining the entire premises in neat and clean condition.

b)

Ensuring that rubbish and combustible material are not thrown about or allowed to accumulate,

even in small quantity, in any portion of the building. Particular attention must be paid to corners

and places hidden from view.

c)

Providing metal receptacles/wastepaper basket (of non-combustible material) at suitable locations

for disposal of waste. Separate receptacles must be provided for disposal of cotton rags/waste,

wherever it is generated, these must under no circumstances be left lying around in any portion of

the building.

d)

Ensuring that receptacles for waste are emptied at regular intervals and the waste removed

immediately for safe disposal outside the building.

e)

Ensuring that all doors/fixtures are maintained in good repairs, particular attention must be paid to

self-closing fire smoke check doors and automatic fire/doors/rolling shutters.

f)

Ensuring that self-closing fire/smoke check doors close properly and that the doors are not wedged

open.

g)

Ensuring that the entire structure of the building is maintained in good repairs.

h) Ensuring that all electrical and mechanical service equipment’s are maintained in good working

condition at all times.

i)

Ensuring that Cars /Scooters etc. are parked systematically in neat rows. It is advisable to mark

parking lines on the ground in the parking areas near the building and in the parking area on ground

floor and in basement(s); as applicable, inside the building. A parking attendant must ensure that

vehicles are parked in an orderly manner and that the vehicles do not encroach upon the open space

surrounding the building.

12.28.2 Smoking Restrictions

1)

Smoking shall be prohibited throughout the basement(s) and in all areas where there is a profusion

of combustible materials. Easily readable ‘NO SMOKING’ signs must be conspicuously posted at

116

locations where they can catch the eye. Each sign must also include a pictograph. The sign may also

be illuminated.

12.28.3 Limiting the Occupant Load in Parking and Other Areas of Basement(s)

Where parking facility is provided in the basement(s) no person other than the floor parking attendant may

be allowed to enter and remain in the parking areas except for parking and removal of Cars/Scooters. Regular

offices must not be maintained in the storage/parking area in the basement(s)unless separated by Fire

separation walls. The stores/go down must be opened for the limited purpose of keeping or removing stores.

No person other than those on duty may be permitted in the air-conditioning plant room(s), HT/LT switch

room, transformer compartment, control room pump-house, generator room, stores and records etc.

12.29

Fire prevention

In addition to the measures recommended above, the following fire prevention measures must be implemented

when the building is in occupation.

a)

Storage of flammable substances, such as diesel oil, gasoline, motor oils, etc. must not be allowed

anywhere within the building. The only exception to this rule may be:

i.

Storage of diesel oil in a properly installed tank in a fire-resisting compartment in the generator room;

ii.

Diesel oil, gasoline, motor oil etc., filled in the vehicle tanks.

b)

Preparation of tea and warming of food must be prohibited throughout the hazardous building.

c)

Where heaters are used during winters, the following precautions must be taken.

i.

All heaters, except convector heaters, must be fitted with guards.

ii.

Heaters must not be placed in direct contact with or too close to any combustible material.

iii.

Heaters must be kept away from curtains to ensure that the latter do not blow over the heater

accidentally.

iv.

Heaters must not be left unattended while they are switched on.

v.

Defective heaters must be immediately removed from service until they have been repaired and tested

for satisfactory performance.

vi.

Use of heaters must be prohibited in the entire basement, fire control room and in all-weather maker

rooms throughout the building. Also, in all places where there is profusion of combustible flammable

materials.

d)

Fluorescent lights must not be directly above the open file racks in offices/record rooms. Where this

is unavoidable, such lights must be switched on only for as long as they are needed.

e)

Filling up of old furniture and other combustible materials such as scrap paper, rags, etc. must not

be permitted anywhere in the building. These must be promptly removed from the building.

f)

More than one portable electrical appliance must not be connected to any single electrical outlet.

g)

Used stencils, ink smeared combustible materials and empty ink tubes must note allowed to

accumulate in rooms/compartments where cyclostyling is done. These must be removed and

disposed of regularly.

117

h) All shutters/doors of main switch panels and compartments/shafts for electrical cables must be kept

locked.

i)

Aisles in record rooms and stores must have a clear uniform width of not less than 1.0 m. Racks

must not be placed directly against the wall/partition.

j)

In record rooms, offices and stores, a clear space of not less than 30 cm. must be maintained between

the top-most stack of stores/records and or lighting fittings whichever is lower.

k)

A similar clearance, and at (k) above must be maintained from fire detectors.

l)

Fire detectors must not be painted under any circumstances and must also be kept free from

lime/distemper.

m) Records must not be piled/dumped on the floor.

n) Welding or use of blow torch shall not be permitted inside the building, except when it is done under

strict supervision and in full conformity with the requirements laid down in IS: 3016-1966 code of

practice for fire precautions in welding and cutting operation.

o)

Printing ink/oil must not be allowed to remain on the floor. The floor must be maintained in a clean

condition at all times.

12.30

Occupancy restrictions

1)

The premises leased to any party shall be used strictly for the purpose for which they are leased.

2)

No dangerous trade/practices (including experimenting with dangerous chemicals) shall be carried

on in the leased premises.

3)

No dangerous goods shall be stored within the leased premises.

4)

The common/public corridor shall be maintained free of obstructions, and the occupants shall not

put up any fixtures that may obstruct the passage in the corridor and/or shall not keep any wares,

furniture or other articles in the corridor.

5)

The penalty for contravention of the condition mentioned above must be immediate termination of

lease and removal of all offending materials.

6)

Regular inspection and checks must be carried out at frequent intervals tonsure compliance with

conditions above.

Note: For any further details / clarification NBC, Part 4 shall be referred. Norms and standards in Part

4 of NBC 2016 shall be overriding in any instance of variance of standards.

118

CHAPTER 13

13. CONSERVATION OF HERITAGE SITES INCLUDING HERITAGE BUILDINGS, HERITAGE PRECINCTS

AND NATURAL FEATURE AREAS

The objective of this regulation shall be to conserve, regulate and manage buildings, artefacts,

structures, areas and precincts of historic and / or aesthetic and / or architectural and / or cultural

significance and / or environmental significance (heritage buildings and heritage precincts) and / or

natural features of environmental significance and or sites of science beauty, so as to promote

heritage sensitive development.

13.1 Applicability:

These regulations shall apply to all heritage sites, buildings, precincts and natural features declared

under Section 2(1ea) and 2(1eb) of the Karnataka Town and Country Planning Act, 1961 (Karnataka

Act 11 of 1963).

13.2 Establishment and composition of the Heritage conservation committee

(1) For every district, except Bengaluru District, there shall be a Heritage Conservation Committee

(herein after referred to as the committee), consisting of the following Members appointed by the State

Government

Table 13.1 Composition of heritage conservation committee for Mangalore City Corporation Areas:

TABLE

Committee Composition

1. The Deputy Commissioner

Chairman

2. The

Commissioner, Archaeology,

Museums and Heritage Department, Mysore

or his nominee.

Ex-Officio Member

3.

The Joint Director or Deputy Director or

Assistant Director of Town and Country

Planning of the Respective City Corporation.

Ex-Officio Member

4. Town planning Member of the respective urban

development authority

Ex-Officio Member

5. Representative from the Department of Tourism. Ex-Officio Member

6. The Assistant Director of Department of

Archaeology, Museums and Heritage of state.

Ex-Officio Member

7. The Commissioner of the respective corporation. Ex-Officio Member

8. The Commissioner of the respective City

Municipal Council.

Ex-Officio Member

9. The Chief officer of the respective Town

Municipal Council.

Ex-Officio Member

10.The Chief officer of the respective Town

Panchayat.

Ex-Officio Member

11.

A Structural Engineer having experience of at

least ten years in the field and membership of

the Institute of Engineers (India)

Member

12.Representative of Archaeological survey of India,

Government of India.

Member

13.The Project Director, DUDC Cell.

Ex-Officio Member

14.An Architect having at least ten years of

experience in architecture and

five

years

in heritage conservation architecture and

membership of the Council of Architecture.

Member

15.An

Environmentalist

with

post

graduate Member

119

degree from a recognized university and having

in depth knowledge and having experience of

ten years in the subject.

16.An Academician possessing a doctorate in

history or Archaeology and having knowledge of

the region for at least ten years.

Member

17.A

Natural

historian

possessing

post-

graduation in botany or zoology or forestry,

preferably with doctorate degree, having ten

years’ experience in the field.

Member

18.An Artist possessing degree in fine arts having

at Least ten years of experience in the field.

Member

19.Representatives of two NGOs in existence for

more Than three years.

Member

20.Representative of Indian Heritage Cities Network

(IHCN), Saraswathi Puram, Mysuru.

Member

21.The Commissioner or Member Secretary of

the Respective urban development authority or

planning authority.

Ex-Officio Member-

Convener

(2) The Committee shall have the power to appoint two additional members who may have lesser

experience, but who have special knowledge of the subject matter.

(3) The tenure of the non-official members shall be three years:

Provided that, the same person shall be eligible for reappointment for further period of three years.

(4) No meeting shall be conducted unless one-third of the members are present from the beginning to the

end of such meeting. Any vacancy in the office of members shall not vitiate any decision taken by the

majority of the members present.

13.3 Powers and functions of the committee- The Committee shall exercise the following powers and

following functions, namely: -

(1) to advise the Local Authority whether development permission shall be granted under these

regulations and the conditions under which permission may be accorded;

(2) to prepare a list of buildings, artefacts, structures, areas, precincts of historic, aesthetic,

architectural, cultural or environmental significance and a supplementary list of natural features of

environmental significance or scenic beauty including sacred groves, hills, hillocks, water bodies (and

the areas adjoining the same), open areas, wooded areas etc., to which these regulations shall apply

from time to time, and grade them according to the heritage value;

120

(3) to advise whether any relaxation, modification, alteration or variance of any of the zonal regulations

or building bye-laws is called for;

(4) to assist the Archaeology, Museums and Heritage Department (AM&HD) in framing regulations for

specific precincts and if necessary for natural features to guide the planning or local or competent

authority, regarding issue of permissions.

(5) To advise on the extent of Development Rights Certificates to be granted.

(6) To advise whether Development Right Certificates may be allowed to be consumed in a heritage

precinct.

(7) to advise in terms of these regulations to allow commercial or office or hotel use of a heritage building

and when to terminate the same.

(8) To advise the planning or local or competent authority in the operation of advertisements or

billboards or street furniture.

(9) To make recommendations to the local or competent authority regarding guidelines to be adopted by

those private parties or public or Government agencies that sponsor beautification schemes near

heritage building and precincts at public intersections and elsewhere.

(10) To provide technical advice, if possible, on the guidelines to the owners of heritage buildings or

precincts to protect, conserve or restore them.

(11) to recommend or advice the Archaeology, Museum and Heritage Department in preparing special

designs and guidelines or publications for the listed buildings, control of height and essential façade

characteristics, such as maintenance of specialty pes of balconies and other heritage items of the

buildings and to suggest suitable designs and appropriate material for replacements, keeping the old

form intact to the extent possible.

(12) to recommend or advice the Archaeology, Museum and Heritage Department in preparing guidelines

relating to design elements and conservation principles to be adhered to and to prepare other guidelines

for the purpose of these regulations.

(13) To advise the local authority on any other issues as may be required, from time to time, during the

course of scrutiny of development permissions and in overall interest of heritage or environmental

conservation.

(14) To appear before the Government either independently or through or on behalf of the local authority

in cases of listed buildings or precincts and listed natural features.

13.4 Procedure for the preparation of list of the heritage sites, buildings, precincts and natural

features. -

(1) The list of the heritage sites, buildings, precincts and additions there to shall be declared by the

planning authority on the advice of the committee and notified accordingly:

121

Provided that, before the list is so notified, objections and suggestions from all persons likely to be

affected shall be invited by newspaper notification of which at least two newspapers published in

local language, granting at least fifteen days of time.

(2) Restrictions on the heritage precincts shall be in force with effect from the date of such newspaper

notification:

Provided that, such listing does not prevent change of ownership or usage.

(3) The list may be supplemented from time to time by the Government, on receipt of proposal from the

concerned agency or suo motto:

Provided that, before the list is so notified, objections and suggestions from all persons likely to be

affected shall be invited by newspaper notification of which atleast two newspapers published in

local language, granting atleast fifteen days of time.

13.5 Criteria for listing. - Before the list so notified under clause 3, the following criteria

shall be observed, namely:-

(a)

Value for architectural, historical or cultural reasons.

A

Architectural

A(arc)

Historical

A(his)

Cultural

A(cul)

(b)

The date or period or design or unique use of the building or

artefact.

B

Building or artefact

Period

B(per)

Design

B(des)

Use

B(use)

(c)

Relevance to social or economic history.

C(seh)

(d)

Association with well-known persons or event.

D(bio)

(e)

A building or group of buildings or areas of distinct architectural

design or style, historic period or way of life having sociological

interest or community value.

E

Style

Historical

(f)

The unique value of building or architectural feature or

artefactorbeingpartofachainofarchitecturaldevelopmentthatwouldbebr

okenifitwerelost.

F

(g)

Its value as a part of a group of buildings.

G(gr)

(h)

Representing forms of technological development.

H(tec)

(i)

Vistas of natural or scenic beauty or interest, including

water-front areas, distinctive or planned lines of sight ,street lines

of sight, street line, sky line or topographical.

I(se)

(j)

Open spaces sometimes integrally planned with their associated

areas having a distinctive way of life which have the potential to be

areas of recreation.

J

(k)

Natural heritage sites.

NH

(l)

Sites of scenic beauty.

(sec)

122

13.6 Grading.-Heritage sites, buildings, precincts and natural features shall be graded as I, II, III,

as detailed below.-

GRADE–I

GRADE–II

GRADE–III

(a)Definition

(i) Shall comprises of

the

buildings

and

precincts of national

or historical importance,

embodying excellence

in architectural style,

design,

technology

and material, usage or

aesthetics, which may

be associated with a

great

historic

event,

personality,

movement

or institution;

(ii)

Shall have been

and

are

the

prime

landmark

of

the

region; and

(iii) All natural sites.

(i)Shall comprise of the

buildings and precincts

of

regional

or

local

importance

possessing

special architectural or

aesthetic

merit

or

cultural

or

historical

significance of a lower

scale than in Grade-1;

(ii)They shall have been

and

are

the

local

landmarks

that

contribute to the image

and

identity

of

the

region; and

(iii)They may be the work of

master craftsmen or may

be models of proportion and

ornamentation, or designed

to suit a particular climate.

(i) Shall comprise of the

buildings and precincts

of

important

townscapes.

(ii) They

evoke

architectural, aesthetic or

sociological interest of a

lower

scale

than

in

Grade–II; and

(iii)

They contribute to

determine the character

of the locality and are the

representatives of lifestyle

of

a

particular

community or region and,

be

distinguished

by

setting on a streetline or

special character of the

façade and uniformity of

height, width and scale.

(b)Objective

Deserves careful

preservation.

Deserves intelligent

Conservation.

Deserves protection of

unique

features

and

attributes.

(c)Scope for

changes

Interventions shall be

permitted to enter on

the exterior or interior

unless it is necessary

in

the

interest

of

strengthening

and

prolonging the life of

the

buildings

or

precincts or any part

or features thereof. For

this

purpose,

only

absolutely

essential

and minimal changes

shall be allowed and

they

must

be

in

accordance

with

the

original.

(i)Internal

changes

and

adaptive

reuse

shall

generally be allowed but

external changes shall be

subject to scrutiny. Care

shall be taken to ensure

the conservation of all

the special aspects for

which it is enlisted under

these regulations.

(ii)Extension

or

additional buildings in

the same

plot

or

compound

may be

allowed

in certain

circumstances:

Provided

that, the

extension or

additional building is in

harmony with and does

not detract from the

existing

heritage

buildings

or precincts,

especially in terms of

height and facade.

(i)External and internal

changes and adaptive

reuse shall generally be

allowed. Changes may

include extensions and

additional buildings in

the

same

plot

or

compound:

Provided

that

the

extension or additional

building is in harmony

with

and does not

detract

from

the

existing

heritage

building

or precinct

especially in

terms of

height or facade; and

(ii)Reconstruction

shall

be

allowed

when

the

building is structurally

weak or unsafe or

affected by accidental

fire

or

any

other

calamity

or

if

reconstruction

is

required

to

consume

123

the permissible FSI and

no

option

other

than

reconstruction

is

available:

Provided

that,

unless

absolutely

essential,

nothing shall be allowed

to spoil or destroy the

special

features

or

attributes for which it is

enlisted under these

regulations.

(d)Procedure

(i)Development permission

for

the changes shall

be given by

the

Planning Authority on

the advice of the

heritage conservation

committee.

(ii) All developments in

the areas surrounding

the enlisted building or

precinct,

shall

be

regulated

and

controlled, ensuring that

it does not mar the

grandeur of or view from

the enlisted building or

precinct.

(i)Development permission

for the changes shall be

given

by

the

Planning

Authority in consultation

with

a

sub-committee

formed under the heritage

conservation committee

(ii)All developments in the

areas

surrounding

the

enlisted building or precinct,

shall

be regulated

and controlled, ensuring that

it does not mar the grandeur

of or view from the enlisted

building or precinct.

(i)Development permission

shall be given for changes

by the Planning Authority

in accordance with the

guidelines, which shall be

laid down by Government

in

Consultation

with

Heritage

Conservation

Committee.

(ii)All developments in the

areas

surrounding

the

enlisted

building

or

precinct, shall be regulated

and

controlled,

ensuring that it does not

mar the grandeur of or view

from the enlisted

Building or precinct.

13.7 Restriction on development, re-development, repairs, etc.-

(1) No development or re-development or engineering operations or additions or alterations or repairs or

renovation, including the painting of buildings, replacement of special features or plastering or demolition

of any or part thereof of the enlisted buildings, precincts and natural features, including the compound

wall, shall be allowed, except with the prior written permission of the local planning authority, in

accordance with these regulations:

Provided that, before granting any such permission for alteration of boundaries of any enlisted

buildings, precincts or natural features, objections and suggestions from the public shall be

invited, by publishing prominently, in two local newspapers and duly considered by the

Committee:

Provided further that, only in exceptional cases, for reasons to be recorded in writing, the

planning authority may refer the matter back to the heritage conservation committee for

reconsideration.

(2) Heritage buildings and precincts which are under the control of department of Public Works or

Corporation or Universities or Boards and any other Government organizations, under the purview

of Government of Karnataka and Government of India, shall been listed and declared as heritage

properties:

Provided that, the decision of the heritage conservation committee, after such re-consideration

shall be final.

124

(3) To preserve the heritage value of the zone, the committee shall have the power to direct, especially

in areas designated, that the exterior design and height of buildings shall have prior approval.

(4) The local authority before permitting signs, outdoor display structures including street furniture in

the enlisted building or precinct, shall strictly follow the specifications, codes, conditions given

below.-

(A) The display or averting signs and outdoor display structures on building and land shall be

permitted in accordance with PartX- Signs and Outdoor Display Structures of National Building

Code of India.

(B) In addition to condition specified under item(A),the following provisions shall apply to

advertisement signs in different land use zones.-

(i) In case of residential Zone, the following non-flashing neon signs with illumination not

exceeding 40-watt light.

(a) One name plate with an area not exceeding 0.1 square metres for each dwelling unit.

(b) For other uses permissible in the zone, one identification sign or bulletin

boardwithanareanotexceeding10square metres, provided that, such area shall not exceed

1.5 metres height.

(c) ‘For sale’ or ‘for rent’ signs for real estate, not exceeding 2 square metres in area,

provided they are located on the premises offered for sale or rent.

(ii)

in

case

of

residential

Zones

with

shop

lines,

non-flashing

business

sign

placedparalleltothewallandnotexceeding1metreinheightperestablishment.

(iii) not withstanding the provisions under item (A) and (B), no advertisements ignore outdoor

display structures shall be permitted on buildings of architectural, aesthetic, historical

or heritage importance as may be decided by the local authority on the advice and

approval of the committee, including on Government buildings:

Provided that, in the case of Government buildings only advertising signs or outdoor display structures

shall be permitted, if they are related to the activities, purposes or programmes of the said building,

which shall be approved by the committee.

Provided further that, if the committee so advises, the local authority shall refuse permission for

any sign or outdoors display structure.

Provided also that, the Committee may prescribe additional guidelines for the same.

13.8

Responsibility of the owners. - It shall be the duty of the owners of enlisted buildings

and precincts to carryout regular repairs and maintenance, at their own cost. The Government

or the local authority shall not be responsible for such repairs and maintenance, except for the

buildings owned by the Government or local authority.

125

.

13.9 Regulations for specified heritage precincts or natural features. -

(1) In case of heritage precincts and natural features, where it is deemed necessary by the committee,

development permission in the form of commencement certificate shall be granted in accordance with

separate guidelines prescribed for the respective precincts or natural features, which shall be framed

by the Archaeology, Museum and Heritage Department (AM&HD) in consultation with the local

authority, on the advice of the committee.

(2) These guidelines shall concern architectural appearances, materials, the setting of buildings, their

volumes, height, planting of trees and include regulations, which will govern planning, building

permissions, choices of restoration methods or spatial planning.

(3) Separate guideline shall be prepared after commissioning a study of the enlisted precincts or natural

features by the Archeology, Museum and Heritage Department. The study shall identify the heritage

issues in all its aspects, fix the objectives to be reached in order to assure the conservation of the

heritage identified and to draft guidelines for management and development of the same. The local

authority shall consider the draft guidelines submitted by Archaeology, Museum and Heritage

Department and obtain public opinion by publishing in the official Gazette and in leading newspapers

for the purpose of inviting suggestions and objections from the public. The local authority,

Archaeology, Museum and Heritage Department and the Committee shall consider all the suggestions

and objections received within a period of sixty days from the date of publication in the official

Gazette.

(4) After consideration of the suggestions and objections, the Archaeology, Museum and Heritage

Department in consultation with local authority, acting on the advice of the committee, shall modify,

if necessary, the draft guidelines and forward the same to the local authority for further submission

to the Government for sanction;

Provided that, pending the consideration of suggestions and objections and pending final sanction from

Government to the draft guidelines, the committee shall have due regard to the draft guidelines, while

considering applications for development, re-development,etc.,of the heritage buildings or precincts or

natural features.

13.10 Road widening and building lines. -

(1) If road widening or building line, under the Karnataka Town and Country Planning Act, 1961, are

prescribed, they shall be in accordance with these regulations, so as to protect the features of the enlisted

buildings or precincts.

If any new road widening or building lines are proposed in the Master Plan, the local authority shall

consider the heritage provisions and environmental aspects while considering applications for

development permissions in these precincts. Necessary steps shall be taken to modify the Master Plan

accordingly and pending this action, the development of new roads shall not be carried out.

(2) No widening of the existing roads under the Karnataka Town and Country Planning Act, 1961 or

Master Plan shall be carried out in a manner which may affect the existing heritage buildings (even

if they are not included in a heritage precinct) or which may affect the enlisted natural features.

126

13.11 Master plan reservations. - If there are Master Plan reservations shown on heritage buildings

or precincts or enlisted natural features, the reservation may be deleted or modified if required.

The local authority, on the advice of the committee, shall move the Government to get these

reservations deleted or modified accordingly.

13.12 Grant of Transferable Development Rights (TDR) in cases of loss of development

rights. - The extent of Development Rights to be granted and used shall be determined by the rules

specially framed for transfer of development rights.

13.13 Incentive uses for heritage buildings.-In cases of buildings, included in the list, falling in

zones where office or commercial or hotel use is normally prohibited, if the owner or lessee agrees to

maintain the listed heritage building in its existing state and to preserve its heritage status with due

repairs and give a written undertaking to that effect, he may be permitted, with the approval of the

committee, to convert part or the whole thereof of the non-commercial area, within such heritage

building to commercial or office or hotel;

Provided that, if the heritage building is not maintained suitably or if the heritage value of the building

is allowed to be diminished in any manner, the local authority suo motto or on the advice of the

committee, shall revoke permission given for such use.

13.14 Maintaining skyline and architectural harmony.-Buildings within heritage precincts or in

the vicinity of heritage building or listed natural features, shall maintain the skyline and follow the

architectural style (without any high rise or multi-storied development), as may be existing in the

surrounding area, so as not to diminish or destroy the value and beauty of, or the view from, the said

heritage building or precinct or natural feature. The development within the precinct or in the vicinity

of heritage building or natural features shall be in accordance to the guidelines framed by

Archaeology, Museum and Heritage Department in association with the local authority on the advice

of the committee.

13.15 Repair fund.- With a view to give monetary help for repairs of the enlisted property, a separate

fund shall be created through Government grants or local authorities or public contributions, which

shall be available to the local authority, who shall disburse the funds on the advice of the

committee:

Provided that, nothing mentioned above shall be deemed to confer any right on the owner or occupier

of the plot to demolish or re-construct or make alterations or additions to his enlisted building or

building in a enlisted precinct, if in the opinion of the committee, such demolition or re-construction

or addition is undesirable.

13.16 Voluntary contribution and agreement with any voluntary organization, person or

company.- (1) The local authority may receive voluntary contributions towards the cost of

maintaining any enlisted building or precinct, and shall manage such contributions for the purpose

of preservation and conservation.

(2)Subject to the prior approval of the Government, local authority may enter into any agreement

with any person or voluntary organization or company, whether incorporated or not, willing to

preserve and conserve any enlisted building or precinct, owned by Government on such terms and

conditions as the Government may determine

127

CHAPTER 14

14

STREAMLINING OF BUILDING PLAN APPROVALS

14.1

Streamlining the building approval/sanction procedure (Ease of Doing Business)

In order to attract investments into the country, efforts are being made by the Government to improve

‘Ease of Doing Business’. In this direction, the limit of Built-up Area (BUA) for Foreign Direct Investment

(FDI) has been reduced from 50,000 Sqm to 20,000 Sqm. In this context, the local bodies have to operate

the entire building approval process in online mode, so that the building plan applications are submitted

online along with building fees and other charges, and after due scrutiny, the approvals are also conveyed

online.

Further, external bodies like Fire and Emergency Services Department, Airports Authority of India (AAI),

Metro Rail Corporation (MRC), Ministry of Railways, Ministry of Environment, Forest and Climate Change

(MoEFCC), Karnataka State Pollution Control Board (KSPCB), Heritage Conservation Committee (HCC),

National Monuments Authority (NMA), Urban Art Commission (UAC), etc. shall grant No Objection

Certificate (NOC)/ approvals on the proposed building plans to the local bodies. All such external bodies

are mandated to prepare online NOC systems compatible to and integrated with that of the local bodies

and the desired information is to be sent to the concerned external bodies and their comments/ NOC/

approval are to be received online so that there is no need for building proponents to pursue matter with

local bodies or external agencies. The specific requirements of the external bodies are to be added in the

Common Application Form (CAF) of the Authority (as specified in Form I and Form II) so that building

proponent has to file all information at a single customized online application (as specified in Appendix-

II). The objective is to make the whole process simplified and streamlined to ensure ease in getting the

approvals for building licence within stipulated time.

14.2

Clearances at Master Plan level

Individual construction proposals should not generally require separate clearances from various

authorities each time. Such clearances should be integrated into the Zonal Regulations of the Master

Plan of the concerned Local Planning Area. The areas unaffected by any of the restrictions should be

clearly marked out and mapped, preferably on a GIS platform. Area zones of differential control

regulations (within the city) by any of these agencies may also be mapped accordingly. This will result in

a composite map of the city with various control regulations as per the various agencies clearly marked

on the map. Thus, the sites which are located outside these restricted/regulated areas would not require

availing clearance from the respective authorities, thereby reducing the clearance process significantly.

The composite map of each LPA would be incorporated as part of the automation process undertaken by

the Government and notified separately for each LPA as and when such maps are prepared, in

consultation with the concerned authorities, preferably on GIS platform.

Following are the clearances which should be integrated into the city Master Plan-

Table 14.1 Clearances from various agencies proposed to be integrated in Master Plans

Sl.

No.

Name of Agency

Type of Clearance

Area of Influence

1. National

Monuments

Authority

through

Competent Authority

Ancient Monument

approval

As prescribed in the AMASAR (Amendment

and Validation) Act, 2010 for protection of

monuments

2. Ministry

of

Environment

Environment

Clearance (EC)

As prescribed in the statutory provisions for

EIA and clearance based on the size of the

128

project in accordance with Environment

Protection Act, 1986

3. Ministry of Defence

Defence Clearance

Area in and around Defence Establishments

as identified by MoD.

4. Coastal

Zone

Management Authority

NOC

(if

near

sea/coastal areas)

Area under the CRZ regulations.

5. NHAI/PWD

Road access

Buffer zones as prescribed by NHAI along

National Highways.

6. Ministry of Railways

Area clearance

Buffer zones as prescribed by Railways along

Rail tracks/depots/yards etc.

7. Airport

Authority

of

India

Height clearance

Height restriction areas in the vicinity of

Airports

Efforts are being made at the Government of India level and the State Government level to coordinate with all

the Central and State ministries and their organizations so that they streamline their own internal processes

to issue no objection etc. wherever required by law. The efforts are mainly focused on delegating the powers

at appropriate levels, establishing an online application process for time bound delivery, creating public

awareness about their requirements, reviewing the restrictions and reducing them, sharing the data and

norms with local authorities to be incorporated in the Master Plan /Zonal Regulations.

Recognizing the concern for streamlining the procedures for clearances to be obtained from various

departments in least possible number of procedures and number of days, the following model shall be

adopted so that the entire process of Pre- and Post-Construction approvals shall be completed within one

month. The detailed timelines for building licence and occupation certificate as notified by government.

14.3

Risk Based Classification of building proposals

There is a need to make provisions for fast-tracking building permission procedures for all non-automatic

approvals. Therefore, in the spirit of ‘Ease of Doing Business’, the buildings have been classified further

on the basis of risk parameters/ risk-based classification to clear the building permits on fast track

system. This kind of classification shall be used for fast tracking the sanction of building plans.

14.3.1 Compound walls abutting public street without Building Development

Construction of Compound walls without Building Development shall be considered as very low

risk development for the application of these Byelaws.

14.3.2 Residential Buildings

For approval of the residential plotted and group housing buildings, risk-based classification

shall be as per Table 14.2 –

Table 14.2 Risk Matrix for development of different Residential buildings

Risks

Very Low

Low

Moderate

High

Criteria

Parameters

Size

of

the Plot

Square

Meters

Below125

m2

125

500 m2

Above 500

m2

All sizes

No.

of

Floors/

(G + no. of

floor)

(G+2)

(G+ 3)

(G+ 4 )

Above (G+4)

Type

of

Developm

ent

Various

Categories

Plotted

Plotted

Plotted/

Group

Housing

Group Housing

129

Approval for risk-based category of buildings may be granted by the designated officers of different

cadres as notified by Government.

14.3.3 Storage/Warehouse Buildings

For approval of the buildings meant for use as storage buildings/warehouses/go down, risk-based

classification shall be as per Table 14.3

Table 14.3 Risk Matrix for development of Storage/Warehouses

Risks

Very Low

Low

Moderate

High

Construction area

in all floors (Sqm)

Up to 250m2

Above 250m2

and

up

to

2000m2

Up to 2000m2

Above 2000m2

Height of building

Below 15m

Below 15m

Below 15m

Below 15m

Abutting proposed

Road width

Min. 12m

Min. 12m

Min. 12m

Min. 12m

Type of Material

Storage

Category A

Category A

Category B

(Stacking

Height-

Medium)

Category B

(Stacking Height-High)

Note:

i. The level of Risk is classified according to the material stored in the warehouse/storehouse. Material shall be

classified according to the Categories defined in Appendix-XXI.

ii. Approval for risk-based category of buildings may be granted by the designated officers of different cadres

as notified by Government.

.

iii. The building application processing fees shall be as prescribed in Appendix-VII.

14.3.4 Commercial & Industrial Buildings

For approval of the buildings meant for Commercial & Industrial uses, risk-based classification shall

be as per Table 14.4

Table 14.4 Risk Matrix for development of Commercial & Industrial Buildings

Risks

Low

Moderate

High

Criteria

Parameters

Size of the Plot

Square Meters

up to 350 m2

Above 350 m2

All sizes

Height of building

Meters

Less than 15m

Upto 18m

Above18m

Abutting Proposed

Road width

Meters

Min 6 m

Min 9 m

Min.12m

Note:

i. The level of Risk is classified according the size and height of the industrial building proposed.

ii. Approval for risk-based category of buildings may be granted by the designated officers of different cadres

as notified by Government.

. The building application processing fees shall be derived by an automated built-in calculator in the online

system.

130

14.4

Fast Tracking Tools:

Fast tracking tools are provided here below for issuing building licence. However, the procedure

prescribed in Clause 3.16, 3.17 & 3.18 shall be followed, except for the construction of Compound

walls abutting public street, without Building Developments. In case of construction of compound

wall without building development, Approval for risk-based category of buildings may be granted by

the designated officers of different cadres as notified by Government.

For very Low Risk Developments:

1)

Plans to be submitted online to the Local Authority along with the required details specified in clause

3.10.2 and Affidavit / Undertaking from the Applicant and Professional on Record for drawing &

supervision.

2)

Deemed Approval with Self-Certification by Professional on Record for drawings and by Owner

14.4.1 For Low-Risk Developments:

1)

Plans to be submitted online to the Local Authority along with the required details specified in

clause 3.10.2

Approval for risk-based category of buildings may be granted by the designated officers of different cadres as

notified by Government. as per the procedure specified in these Byelaws within the timelines specified in

Appendix VIII

14.4.2 For Moderate Risk Developments:

1)

Plans to be submitted online to the Local Authority along with the required details specified in clause

3.10.2

2)

Approval to be granted by the Local Authority within the timelines specified by Government

3)

Deemed licence to be issued online automatically if the Local Authority does not grant approval within

the timelines specified in Appendix VIII (KMC Act Procedure to be followed)

14.4.3 For High Risk Developments:

1)

Common application form (as specified in Form I & Form II) with all the details as specified in

Appendix-II for building licence and all required NOCs to be submitted online to the Local Authority

along with the details specified in clause 3.10.2

2)

NOCs to be issued by the concerned departments online within the timelines specified by Government

3)

Deemed NOCs to be issued online by the Local Authority if the concerned department does not issue

NOC within the specified timelines.

4)

Approval to be granted by the Local Authority within the timelines specified by Government

5)

Deemed licence to be issued online automatically if the Local Authority does not grant approval within

the timelines specified by Government (KMC Act Procedure to be followed)

14.5

Other Tools to enhance ease of doing business:

Some other Tools, regarding Fast-Track construction licences are:

131

14.5.1 ‘Citizens’ Charter

A ‘Citizens’ charter as notified by the Government shall list out the timelines and upper limits of time

for the delivery of citizen services of the Authority. The objective of issuing the charter is to improve the

quality of public service in terms of timely delivery. Such charters shall be brought out by all the Local

Body to maintain high standards of accountability and transparency. The standards of service to be

provided, the maximum number of days required for providing various citizen services and the standard

procedure shall be listed out in the citizens’ charter.

14.5.2 Capacity building

Capacity building measures are to be adopted for such functionaries to identify Training Needs (TNA) and

other technical requirement of duties that they are required to discharge as per the provisions of this

Byelaws. Fresh recruitments commensurate to the technical qualification/ experience are to be made by

the Local Authority (in consultation with the State Government, if required), if there is complete / notable

absence of the technical expertise needed for the said services.

The Local Authority shall conduct periodical orientation programmes, not less than once in 6 months for

all stakeholders, to enhance the capacity of all the stakeholders and to bring in more awareness among

the general public about the benefits of this Byelaws.

14.5.3 Simplification of Byelaws

The building Byelaws have been simplified for easy comprehension of lay person as well as professionals

involved in developmental activities. The simplification process also includes the process of application,

the filling up of forms and streamlining the process of application and sanctioning through online system.

132

CHAPTER 15

15. CLIMATE RESILIENT CONSTRUCTION – INTEGRATION OF ENVIRONMENTAL CLEARANCE WITH

SANCTION

Land, Air, Noise, Water, Energy, biological, socio-economic, solid / other waste management are the main

facets considered in relation to Pre, during and Post Building Construction for Sustainable Environment

Management. Therefore, it is necessary for the building process to ensure compliance to various conditions

laid down by the Ministry of Environment, Forest and Climate Change.

The building construction sector is a major contributor towards carbon footprints which affects

climate change. India is committed towards mitigating the effects of climate change and moving towards

internationally accepted norms for environmental friendly building construction. Currently this objective of

environmental safeguard is achieved through obtaining a specific environmental clearance (EC) for any

construction project having a size of more than 20,000 Sqm. This is administered under notification of

Ministry of Environment, Forest and Climate Change.

With rapid urbanisation and growth of Indian economy, it is anticipated that the construction activity

will experience a proportionate growth. Government is also committed towards streamlining of clearances for

buildings and real estate sector and empowering the urban local bodies with an objective of Ease of Doing

Business.

Integration of environmental condition in building Byelaws:

1) When the State Government notifies the Byelaws and rules concurred by the Ministry of Environment,

Forest and Climate Change, the Central Government may issue an order stating that no separate

environmental clearance is required for buildings to be constructed in the State or authority areas.

2) The Local Authority shall certify the compliance of the environmental conditions prior to issuance of

Completion Report, as prescribed in the Byelaws, as per the requirements stipulated for such buildings based

on the recommendation of the Environmental Cell constituted in the Authority.

3) For the purpose of certification regarding incorporation of environmental conditions in buildings, the

Ministry of Environment, Forest and Climate Change may empanel through competent agencies, the Qualified

Building Environment Auditors (QBEAs) to assess and certify the building projects, as per the requirements

of this notification and the procedure for accreditation of Qualified Building Auditors and their role as given

at Appendix-XIX.

4) In order to implement the integration of environmental condition in building Byelaws, the Local Authority

shall constitute the Environment Monitoring Cell (herein after called as Cell), for compliance and monitoring

and to ensure environmental planning within their jurisdiction.

5) The Cell shall monitor the implementation of the Byelaws and rules framed for Integration of environmental

conditions for construction of building and the Cell may utilise the services of the licensed professionals as

prescribed in Appendix-IA

6) The Cell shall function under the administrative control of the Authority.

7) The composition and functions of the Cell are given at Appendix-XX.

8) The environmental concerns are integrated in the building Byelaws, as per their size of the project, and the

Local Authority shall follow the procedure, as given below:

9) No Environmental Clearance from Ministry of Environment, Forest and Climate Change and no Consent

to Establish and Operate under the Water (Prevention and Control of Pollution) Act, 1974 and the Air

133

(Prevention and Control of Pollution) Act, 1981 will be required from the State Pollution Control Boards for

buildings as specified by the competent Authority.

15.1

Environmental conditions for compliance during Building approvals

The Ministry of Environment, Forest and Climate Change has now decided to integrate the environmental

concerns into building plan approval process and empowering the concerned local body to approve and certify

compliance of stipulated requirements. The new building construction proposals, for the purpose of this

chapter are classified in the following 3 categories: -

1) Building Category ‘1’: Built-up Area 5,000 Sqm to < 20,000 Sqm

2) Building Category ‘2’: Built-up Area ≥ 20,000 Sqm to 50,000 Sqm

3) Building Category ‘3’: Built-up Area ≥ 50,000Sq.m to 1,50,000 Sqm

Note: (area mentioned against each building category is the total constructed area of the building including

car parking area)

15.1.1 BUILDINGS CATEGORY ‘1’ (5,000 to < 20,000 Square meters)

A Self Declaration Form to comply with the environmental conditions as stipulated in Table 15.1 along

with Form-IIb and certification by the Building Environment Auditor to be submitted by the project

proponent as a common application for building licence to the Local Authority along with the specified fee

in separate accounts. Thereafter, the Local Authority may issue the building License incorporating the

environmental conditions in it and allow the project to start based on the self-declaration and certification

along with the application. After completion of the construction of the building, the project proponent may

update Form-IIb based on audit done by the qualified Building Environment Auditor (BEA) and shall

furnish the revised compliance undertaking to the Local Authority along with Form VIII. Any non-

compliance issues in buildings less than 20,000 square meters shall be dealt as prescribed in the rules

framed under Section 76F & 76 FFF of KTCP Act.

15.1.2 BUILDINGS CATEGORY ‘2’ (>20,000 to <1,50,000 Square meters)

A Self Declaration Form to comply with the environmental conditions as stipulated in Table 15.2 along with

Form-IIb and Compliance Report submitted by Environment Engineer on Record (EER) to be submitted by

the project proponent as a common application for building licence to the Local Authority along with the

specified fee in separate accounts. The fee for environmental appraisal will be deposited in a separate account.

The Environment Monitoring Cell will process the Application after obtaining Evaluation Report of the

Building Environment Auditor (of the compliance report submitted by the EER) and if the Application and

drawings / details submitted are in order, forward the same to the Commissioner.

If the Environment Monitoring Cell is of the opinion that the application/drawings submitted by the

proponent is not in accordance with the provisions of these Byelaws (based on the evaluation report submitted

by the Building Environment Auditor (BEA), the Environment Monitoring Cell shall suggest the necessary

changes to be made and forward the same to the Commissioner. The Commissioner shall issue endorsement

to the proponent as per the suggestions made by the Environment Monitoring Cell and the proponent shall

make the necessary changes and resubmit the application / drawings to the satisfactions of the Environment

Monitoring Cell and the Environment Monitoring Cell shall accept the revisions made by the proponent.

According to the Proponent or the concerned EER, if the defects / changes suggested in the endorsement are

incorrect, the proponent may file objection, to the commissioner, stating the correctness of the drawings /

details submitted.

134

If any such objection is received from the Proponent, the Commissioner shall conduct joint enquiry along

with the Applicant, the concerned EER, the Building Environment Auditor who has submitted the Evaluation

Report and the Environment Monitoring Cell which has suggested the changes in the drawings / details

submitted (based on which the endorsement was issued), by giving notice to all, within seven days of receiving

objection.

During the enquiry, the Commissioner, after hearing the views of both the parties, shall either accept or reject

the objection raised by the proponent and instruct the proponent accordingly in writing and sending a copy

of the same to the Environment Monitoring Cell and the decision of the Commissioner shall be final. The

Proponent shall abide by the decision of the Commissioner and make necessary changes as instructed by the

commissioner, if any and resubmit the application.

After receiving the recommendation of the Environment Monitoring Cell or after receiving the changes made

as instructed by the Commissioner (as mentioned above), the building Licence and environmental clearance

shall be issued in an integrated format by the Authority.

After executing all works in site as per the environmental clearance issued by the Local Authority and

certification of works by the licensed professional, the Completion Report shall be submitted as prescribed in

clause 3.17.

The project proponent shall submit Performance Data and Certificate of Continued Compliance of the project

for the environmental condition’s parameters applicable after completion of construction, from Building

Environment Auditors every year to the Environment Monitoring Cell with special focus on the following

parameters (as detailed in clause 11.2): -

(a) Energy Use (including all energy sources).

(b) Energy generated on site from onsite Renewable energy sources.

(c) Water use and waste water generated, treated and reused on site.

(d) Waste Segregated and Treated on site.

(e) Tree plantation and maintenance.

After completion of the project, the Cell shall randomly check the projects compliance status including the

yearly audit report. Penalties and action against the concerned persons for non-compliances of the

environmental conditions and parameters shall be initiated as prescribed in the rules framed under Section

76F and 76 FFF of KTCP Act.

15.1.3 BUILDINGS CATEGORY ‘3’ (≥ 50,000 to < 1,50,000 Square meters)

All the process mentioned in Clause 15.1.2 shall be followed except that after completion of the project, the

Cell shall check all the projects for compliance on a yearly basis including the yearly audit report submitted

by Building Environment Auditors.

135

Table 15.1: Environmental Conditions for Building and Construction

(Building Category ‘1’: 5,000Sqm to < 20,000Sqm)

Sl.

No.

Medium

Environmental conditions

1

Topography

Natural Drainage

The natural drain system should be maintained for ensuring unrestricted flow of water.

No construction shall be allowed to obstruct the natural drainage through the site. No

construction is allowed on wetland and water bodies. Check dams, bio swales,

landscape, and other sustainable urban drainage systems (SUDS) are allowed for

maintaining the drainage pattern and to harvest rainwater.

Buildings shall be designed to follow the natural topography as much as possible.

Minimum cutting and filling should be done.

2

Water

conservations-

Rainwater

Harvesting

and

Ground

Water

Recharge

A complete plan for rainwater harvesting water efficiency and conservation should be

prepared.

The provisions on rainwater harvesting and Ground water recharging prescribed in

Chapter 10 and as specified by the Local Authority or as notified by the Government

should be followed. A rainwater harvesting plan needs to be designed where the

recharge bores of minimum one recharge bore per 5,000 Sqm of built-up area and

storage capacity of minimum one day of total freshwater requirement shall be provided.

In areas where ground water recharge is not feasible, the rainwater should be harvested

and stored for reuse. The ground water shall not be withdrawn without approval from

the Competent Authority.

All recharges should be limited to shallow aquifer.

2(a)

At least 20% of the open spaces (setback area)) shall be pervious. Use of Grass pavers,

paver blocks with at least 50% opening, landscape etc. would be considered as pervious

surface.

2(b)

Water efficient appliances shall be used. Low flow fixtures or sensors be used to

promote water conservation. Details as specified by the Local Authority or as notified

by the Government shall be followed.

2(c)

Separation of grey and black water should be done by the use of dual plumbing system.

In case of single stack system separate recirculation lines for flushing by giving dual

plumbing system be done.

3

Solid

Waste

Management

Solid waste: Separate wet and dry bins must be provided in each unit and at the ground

level for facilitating segregation of waste.

The provisions of the Solid Waste (Management) Rules 2016 and the e-waste

(Management) Rules 2016, and the Plastics Waste (Management) Rules 2016 shall be

followed.

3(a)

All non-biodegradable waste shall be handed over to authorized recyclers for which a

written tie up must be done with the authorized recyclers.

3(b)

Treatment of wet waste and sanitary waste on site (organic dry waste also is preferred)

using Organic waste composter / Vermiculture pit, Black Soldier Fly larva or any other

approved technology shall be installed with a minimum capacity of 0.3 kg /person/day

must be installed.

4

Sewage Treatment

Plant

/

Sullage

Treatment Plant

Onsite sewage treatment of capacity of treating 100% wastewater to be installed, where

the sewer lines of the building cannot be connected to city level sewerage system.

In case the sewer line of the building can be connected to the city level sewerage system,

the relaxation on the size of STP / Sullage Treatment Plant should be obtained from

the competent Authority, subject to the minimum capacity of the STP / Sullage

Treatment Plant to cater to the requirement of recycled treated water in the project.

Treated waste water shall be reused on site for landscape, flushing, cooling tower, and

other end-uses. Excess treated water shall be discharged into the city level sewerage

system or as per CPCB norms. Natural treatment systems shall be promoted. Sludge

from the onsite sewage treatment, including septic tanks, shall be collected, conveyed

and disposed as per the Ministry of Urban Development, Central Public Health and

Environmental Engineering Organisation (CPHEEO) Manual on Sewerage and Sewage

Treatment Systems, 2013. Preferred types of STP / Sullage Treatment Plant shall be as

notified by the Government.

136

5

Energy

Compliance with the Energy Conservation Building Code (ECBC) of Bureau of Energy

Efficiency shall be ensured. Buildings in the States which have notified their own

ECBC, shall comply with the State ECBC. Details as notified by the Government shall

be followed.

All lighting and other electric fixtures shall be of low energy consumption (Electrical

Appliances – BEE Star and Energy Efficient Appliances)

Concept of passive solar design that minimize energy consumption in buildings by

using design elements, such as building orientation, landscaping, efficient building

envelope, appropriate fenestration, increased day lighting design and thermal mass etc.

shall be incorporated in the building design.

Wall, window, and roof u-values shall be as per ECBC specifications.

5(a)

Solar, wind or other Renewable Energy shall be installed to meet electricity generation

equivalent to 5% of the power consumption of the project subject to minimum provision

made as prescribed in clause 11.2.3 or as notified by the Government.

5(b)

Solar water heating shall be provided to meet the total hot water demand of the

commercial and institutional building. Residential buildings are also to meet its hot

water demand from solar water heaters, unless additional power supply from renewable

energy sources is provided equal to the power requirement of electric water heaters, as

prescribed in Clause 11.2.4.

Alternatively, any other hybrid system (including other cost-efficient technologies such

as heat pump etc.) may be proposed for hot water generation instead of solar water

heating system. Details prescribed in Clause 11.2.4 or as notified by the Government

shall be followed.

5(c)

Use of environment friendly materials in bricks, blocks and other construction

materials, shall be required for at least 20% of the construction material quantity.

These include fly ash bricks, hollow bricks, AACs, Fly Ash Lime Gypsum blocks,

Compressed earth blocks, and other environment friendly materials.

Fly ash should be used as building material in the construction as per the provisions

of the Fly Ash Notification of September 1999 as amended from time to time.

6

Air

Quality

and

Noise

Dust, smoke & other air pollution prevention measures shall be provided for the

building as well as the site. These measures shall include screens for the building under

construction, continuous dust/ wind breaking walls all around the site (at least 3 m

height). Plastic/tarpaulin sheet covers shall be provided for vehicles bringing in sand,

cement, murram and other construction materials prone to causing dust pollution at

the site as well as taking out debris from the site. Wheel washing for the vehicles should

be done before leaving the site.

Sand, murram, loose soil, cement, stored on site shall be covered adequately so as to

prevent dust pollution.

Wet jet shall be provided for grinding and stone cutting. Unpaved surfaces and loose

soil shall be adequately sprinkled with water to suppress dust.

All construction and demolition debris shall be stored at the site (and not dumped on

the roads or open spaces outside) before they are properly disposed. All demolition and

construction waste shall be managed as per the provisions of the Construction and

Demolition Waste Rules 2016. Details as specified by the Government shall be followed.

All workers working at the construction site and involved in loading, unloading, carriage

of construction material and construction debris or working in any area with dust

pollution shall be provided with dust mask.

For indoor air quality, the ventilation provisions as per National Building Code of India.

6(a)

The location of the DG set and exhaust pipe height shall be as per the provisions of the

CPCB norms.

7

Green cover

A minimum of 1 tree for every 80 Sqm. of land should be planted and maintained. The

existing trees will be counted for this purpose. Preference should be given to planting

native species

7(a)

Where the trees need to be cut, compensatory plantation in the ratio of 1:3 (i.e., planting

of 3 trees for every 1 tree that is cut) shall be done and maintained.

137

Table 15.2: Environmental Conditions for Building and Construction

(Building Category ‘2’: ≥ 20,000 Sqm to 50,000 Sqm)

Sl.

No.

Medium

Environmental conditions

1

Topography

Natural

Drainage

The natural drain system should be maintained for ensuring unrestricted flow of water.

No construction shall be allowed to obstruct the natural drainage through the site. No

construction is allowed on wetland and water bodies. Check dams, bio swales,

landscape, and other sustainable urban drainage systems (SUDS) are allowed for

maintaining the drainage pattern and to harvest rainwater.

Buildings shall be designed to follow the natural topography as much as possible.

Minimum cutting and filling should be done.

2

Water

conservations-

Rainwater

Harvesting and

Ground

Water

Recharge

A complete plan for rainwater harvesting water efficiency and conservation should be

prepared.

The provisions on rainwater harvesting and Ground water recharging prescribed in

Chapter 10 and Appendix-XVII as notified by the Government should shall be followed.

A rainwater harvesting plan needs to be designed where the recharge bores of minimum

one recharge bore per 5,000 Sqm of built-up area and storage capacity of minimum one

day of total freshwater requirement shall be provided. In areas where ground water

recharge is not feasible, the rainwater should be harvested and stored for reuse. The

ground water shall not be withdrawn without approval from the Competent Authority.

All recharges should be limited to shallow aquifer.

2(a)

At least 20% of the open spaces (setback area) shall be pervious. Use of Grass pavers,

paver blocks with at least 50% opening, landscape etc. would be considered as pervious

surface.

2(b)

Water efficient appliances shall be used. Low flow fixtures or sensors be used to promote

water conservation. Details as notified by the Government shall be followed.

2(c)

Separation of grey and black water should be done by the use of dual plumbing system.

In case of single stack system separate recirculation lines for flushing by giving dual

plumbing system be done. Details as specified as notified by the Government shall be

followed.

3

Solid

Waste

Management

Solid waste: Separate wet and dry bins must be provided in each unit and at the ground

level for facilitating segregation of waste.

The provisions of the Solid Waste (Management) Rules 2016 and the e-waste

(Management) Rules 2016, and the Plastics Waste (Management) Rules 2016 shall be

followed. Details as specified Appendix-XVIII-A shall be followed.

3(a)

All non-biodegradable waste shall be handed over to authorized recyclers for which a

written tie up must be done with the authorized recyclers.

3(b)

Treatment of wet waste on site (organic dry waste also is preferred) using Organic Waste

Converter, Vermiculture pit, Black Soldier Fly larva or any other approved technology

shall be installed, and sanitary waste shall be incinerated as specified in Appendix-

XVIII-A

4

Sewage

Treatment

Plant / Sullage

Treatment Plant

Onsite sewage treatment has to be done for treating 100% wastewater, by installing

Sewage Treatment Plant (STP) of required capacity to be installed, where the sewer lines

of the building cannot be connected to city level sewerage system.

In case the sewer line of the building can be connected to the city level sewerage system,

the relaxation on the size of STP or Sullage Treatment Plant (SuTP), as the case may be,

may be allowed should be obtained from the competent Authority, subject to the

minimum capacity of the STP / SuTP to cater to the requirement of recycled treated

water in the project and after getting NOC from the Authority to connect the excess raw

Sewage to the city level sewerage system. Treated waste water shall be reused on site

for landscape, flushing, cooling tower, and other end-uses. Excess treated water shall

be discharged into the city level sewerage system or as per CPCB norms. Natural

treatment systems shall be promoted. Sludge from the onsite sewage treatment,

including septic tanks, shall be collected, conveyed and disposed as per the Ministry

of Urban Development, Central Public Health and Environmental Engineering

Organisation (CPHEEO) Manualon Sewerage and Sewage Treatment Systems, 2013.

Preferred types of STP / Sullage Treatment Plant shall be as notified by the

Government..

138

5

Energy

Compliance with the Energy Conservation Building Code (ECBC) of Bureau of Energy

Efficiency shall be ensured Buildings in the States which have notified their own ECBC,

shall comply with the State ECBC. Details as notified by the Government shall be

followed.

All lighting and other electric fixtures shall be of low energy consumption (Electrical

Appliances – BEE Star and Energy Efficient Appliances)

Concept of passive solar design that minimize energy consumption in buildings by using

design elements, such as building orientation, landscaping, efficient building envelope,

appropriate fenestration, increased day lighting design and thermal mass etc. shall be

incorporated in the building design.

Wall, window, and roof u-values shall be as per ECBC specifications.

5(a)

Solar, wind or other Renewable Energy shall be installed to meet electricity generation

equivalent to 5% of the power consumption of the project subject to minimum provision

made as prescribed in clause 11.2.3 or as notified by the Government.

5(b)

Solar water heating shall be provided to meet the total hot water demand of the

commercial and institutional building. Residential buildings are also to meet its hot

water demand from solar water heaters, unless additional power supply from renewable

energy sources is provided equal to the power requirement of electric water heaters as

prescribed in Clause 11.2.4..

Alternatively, any other hybrid system (including other cost-efficient technologies such

as heat pump etc.) may be proposed for hot water generation instead of solar water

heating system. Details prescribed in Clause 11.2.4 or as notified by the Government

shall be followed.

5(c)

Use of environment friendly materials in bricks, blocks and other construction

materials, shall be required for at least 20% of the construction material quantity. These

include fly ash bricks, hollow bricks, AACs, Fly Ash Lime Gypsum blocks, Compressed

earth blocks, and other environment friendly materials.

Fly ash should be used as building material in the construction as per the provisions of

the Fly Ash Notification of September 1999 as amended from time to time.

6

Air Quality and

Noise

Dust, smoke & other air pollution prevention measures shall be provided for the

building as well as the site. These measures shall include screens for the building under

construction, continuous dust/ wind breaking walls all around the site (at least 3 m

height). Plastic/tarpaulin sheet covers shall be provided for vehicles bringing in sand,

cement, murram and other construction materials prone to causing dust pollution at

the site as well as taking out debris from the site. Wheel washing for the vehicles should

be done before leaving the site.

Sand, murram, loose soil, cement, stored on site shall be covered adequately so as to

prevent dust pollution.

Wet jet shall be provided for grinding and stone cutting. Unpaved surfaces and loose

soil shall be adequately sprinkled with water to suppress dust.

All construction and demolition debris shall be stored at the site (and not dumped on

the roads or open spaces outside) before they are properly disposed. All demolition and

construction waste shall be managed as per the provisions of the Construction and

Demolition Waste Rules 2016. Details as notified by the Government shall be followed.

All workers working at the construction site and involved in loading, unloading, carriage

of construction material and construction debris or working in any area with dust

pollution shall be provided with dust mask.

For indoor air quality, the ventilation provisions as per National Building Code of India.

6(a)

The location of the DG set and exhaust pipe height shall be as per the provisions of the

CPCB norms.

7

Green cover

A minimum of 1 tree for every 80 Sqm. of land should be planted and maintained. The

existing trees will be counted for this purpose. Preference should be given to planting

native species

7(a)

Where the trees need to be cut, compensatory plantation in the ratio of 1:3 (i.e., planting

of 3 trees for every 1 tree that is cut) shall be done and maintained.

8

Topsoil

Preservation

and Reuse

Topsoil should be stripped to a depth of 20 cm from the areas proposed for buildings,

roads, paved areas, and external services. It should be stockpiled appropriately in

designated areas and reapplied during plantation of the proposed vegetation on site.

139

9

Transport

A comprehensive mobility plan, as per MoUD best practices guidelines (URDPFI), shall

be prepared to include motorized, non-motorized, public, and private networks.

Road should be designed with due consideration for environment, and safety of users.

The road system can be designed with these basic criteria.

1. Hierarchy of roads with proper segregation of vehicular and pedestrian traffic.

2. Traffic calming measures.

3. Proper design of entry and exit points.

4. Parking norms as per local regulation.

Table 15.3: Environmental Conditions for Building and Construction

(Building Category ‘3’: ≥ 50,000 Sqm to 1,50,000Sqm)

Sl.

No.

Medium

Environmental conditions

1

Topography

Natural Drainage

The natural drain system should be maintained for ensuring unrestricted flow of

water. No construction shall be allowed to obstruct the natural drainage through the

site. No construction is allowed on wetland and water bodies. Check dams, bio

swales, landscape, and other sustainable urban drainage systems (SUDS) are

allowed for maintaining the drainage pattern and to harvest rainwater.

Buildings shall be designed to follow the natural topography as much as possible.

Minimum cutting and filling should be done.

2

Water

conservations-

Rainwater

Harvesting

and

Ground

Water

Recharge

A complete plan for rainwater harvesting water efficiency and conservation should

be prepared.

The provisions on rainwater harvesting and Ground water recharging prescribed in

Chapter 10 and as notified by the Government should be followed. A rainwater

harvesting plan needs to be designed where the recharge bores of minimum one

recharge bore per 5,000 Sqm of built up area and storage capacity of minimum one

day of total freshwater requirement shall be provided. In areas where ground water

recharge is not feasible, the rainwater should be harvested and stored for reuse. The

ground water shall not be withdrawn without approval from the Competent

Authority.

All recharges should be limited to shallow aquifer.

2(a)

At least 20% of the open spaces (setback area) shall be pervious. Use of Grass pavers,

paver blocks with at least 50% opening, landscape etc. would be considered as

pervious surface.

2(b)

Water efficient appliances shall be used. Low flow fixtures or sensors be used to

promote water conservation. Details as notified by the Government shall be followed.

2(c)

Separation of grey and black water should be done by the use of dual plumbing

system. In case of single stack system separate recirculation lines for flushing by

giving dual plumbing system be done. Details as notified by the Government shall

be followed.

3

Solid

Waste

Management

Solid waste: Separate wet and dry bins must be provided in each unit and at the

ground level for facilitating segregation of waste.

The provisions of the Solid Waste (Management) Rules 2016 and the e-waste

(Management) Rules 2016, and the Plastics Waste (Management) Rules 2016 shall

be followed. Details as as notified by the Government shall be followed.

3(a)

All non-biodegradable waste shall be handed over to authorized recyclers for which

a written tie up must be done with the authorized recyclers.

3(b)

Treatment of wet waste and sanitary waste on site (organic dry waste also is

preferred) using Organic waste composter/Vermiculture pit, Black Soldier Fly larva

or any other approved technology shall be installed with a minimum capacity of 0.3

kg /person/day must be installed.

4

Sewage Treatment

Plant

/

Sullage

Treatment Plant

Onsite sewage treatment of capacity of treating 100% wastewater to be installed,

where the sewer lines of the building cannot be connected to city level sewerage

system.

140

In case the sewer line of the building can be connected to the city level sewerage

system, the relaxation on the size of STP / Sullage Treatment Plant should be

obtained from the competent Authority, subject to the minimum capacity of the STP

/ Sullage Treatment Plant to cater to the requirement of recycled treated water in the

project.

Treated waste water shall be reused on site for landscape, flushing, cooling tower,

and other end-uses. Excess treated water shall be discharged into the city level

sewerage system or as per CPCB norms. Natural treatment systems shall be

promoted. Sludge from the onsite sewage treatment, including septic tanks, shall be

collected, conveyed and disposed as per the Ministry of Urban Development, Central

Public Health and Environmental Engineering Organisation (CPHEEO) Manual on

Sewerage and Sewage Treatment Systems, 2013. Preferred types of STP / Sullage

Treatment Plant shall be as notified by the Government.

5

Energy

Compliance with the Energy Conservation Building Code (ECBC) of Bureau of Energy

Efficiency shall be ensured Buildings in the States which have notified their own

ECBC, shall comply with the State ECBC. Details as notified by the Government

shall be followed.

All lighting and other electric fixtures shall be of low energy consumption (Electrical

Appliances – BEE Star and Energy Efficient Appliances)

Concept of passive solar design that minimize energy consumption in buildings by

using design elements, such as building orientation, landscaping, efficient building

envelope, appropriate fenestration, increased day lighting design and thermal mass

etc. shall be incorporated in the building design.

Wall, window, and roof u-values shall be as per ECBC specifications.

5(a)

Solar, wind or other Renewable Energy shall be installed to meet electricity

generation equivalent to 5% of the power consumption of the project subject to

minimum provision made as prescribed in clause 11.2.3 or as notified by the

Government.

5(b)

Solar water heating shall be provided to meet the total hot water demand of the

commercial and institutional building. Residential buildings are also to meet its hot

water demand from solar water heaters, unless additional power supply from

renewable energy sources is provided equal to the power requirement of electric water

heaters, as prescribed in Clause 11.2.4.

Alternatively, any other hybrid system (including other cost-efficient technologies

such as heat pump etc.) may be proposed for hot water generation instead of solar

water heating system. Details prescribed in Clause 11.2.4 or as notified by the

Government shall be followed.

5(c)

Use of environment friendly materials in bricks, blocks and other construction

materials, shall be required for at least 20% of the construction material quantity.

These include fly ash bricks, hollow bricks, AACs, Fly Ash Lime Gypsum blocks,

Compressed earth blocks, and other environment friendly materials.

Fly ash should be used as building material in the construction as per the provisions

of the Fly Ash Notification of September 1999 as amended from time to time.

6

Air

Quality

and

Noise

Dust, smoke & other air pollution prevention measures shall be provided for the

building as well as the site. These measures shall include screens for the building

under construction, continuous dust/ wind breaking walls all around the site (at

least 3 m height). Plastic/tarpaulin sheet covers shall be provided for vehicles

bringing in sand, cement, murram and other construction materials prone to causing

dust pollution at the site as well as taking out debris from the site. Wheel washing

for the vehicles should be done before leaving the site.

Sand, murram, loose soil, cement, stored on site shall be covered adequately so as

to prevent dust pollution.

Wet jet shall be provided for grinding and stone cutting. Unpaved surfaces and loose

soil shall be adequately sprinkled with water to suppress dust.

All construction and demolition debris shall be stored at the site (and not dumped

on the roads or open spaces outside) before they are properly disposed. All demolition

and construction waste shall be managed as per the provisions of the Construction

141

and Demolition Waste Rules 2016. Details as notified by the Government shall be

followed.

All workers working at the construction site and involved in loading, unloading,

carriage of construction material and construction debris or working in any area with

dust pollution shall be provided with dust mask.

For indoor air quality, the ventilation provisions as per National Building Code of

India.

6(a)

The location of the DG set and exhaust pipe height shall be as per the provisions of

the CPCB norms.

7

Green cover

A minimum of 1 tree for every 80 Sqm. of land should be planted and maintained.

The existing trees will be counted for this purpose. Preference should be given to

planting native species

7(a)

Where the trees need to be cut, compensatory plantation in the ratio of 1:3 (i.e.,

planting of 3 trees for every 1 tree that is cut) shall be done and maintained.

8

Topsoil

Preservation

and Reuse

Topsoil should be stripped to a depth of 20 cm from the areas proposed for buildings,

roads, paved areas, and external services. It should be stockpiled appropriately in

designated areas and reapplied during plantation of the proposed vegetation on site.

9

Transport

A comprehensive mobility plan, as per MoUD best practices guidelines (URDPFI),

shall be prepared to include motorized, non-motorized, public, and private networks.

Road should be designed with due consideration for environment, and safety of

users. The road system can be designed with these basic criteria.

1. Hierarchy of roads with proper segregation of vehicular and pedestrian

traffic.

2.

Traffic calming measures.

3.

Proper design of entry and exit points.

4.

Parking norms as per local regulation.

10

Environment

Management Plan

An environmental management plan (EMP) shall be prepared and implemented to

ensure compliance with the environmental conditions specified in item number 1 to

9 above. A dedicated Environment Monitoring Cell with defined functions and

responsibility shall be put in place to implement the EMP. The environmental cell

shall ensure that the environment infrastructure like Sewage Treatment Plant,

Landscaping, Rainwater Harvesting, Energy efficiency and conservation, water

efficiency and conservation, solid waste management, renewable energy etc. are kept

operational and meet the required standards. The environmental cell shall also keep

the record of environment monitoring and those related to the environment

infrastructure.

Note: The solid waste management system and wastewater management system proposed in the above tables

or as notified by the government (along with monitoring mechanism for the effective functioning of the

systems) shall be followed.

142

CHAPTER 16

16 KARNATAKA ENERGY CONSERVATION BUILIDING CODE (KECBC)

Compliance Requirements

a.

Buildings or building complex that have a connected load of 100kW or greater or a contract

demand of 120 KVA or greater and are intended to be used for commercial purposes must comply with

the Karnataka Energy Conservation Building Code 2018 (hereinafter referred to as the said code) as

modified from time to time:

Provided that, the buildings intended for private residential purposes only, are exempted for compliance.

b.

Commercial building. - A building is classified as “Commercial”, if it is used for any of the

following purposes, namely; -

a)

Hospitality: All hotels and resorts;

b)

Educational: School, collage, university and other educational Institutions;

c)

Healthcare: Hospitals, Out-patient units and other health care units;

d) Shopping Complex: Shopping malls, Stand-alone retails, Open-gallery malls and Super markets;

e)

Business: Day-time use and 24-hour use business units; and

f)

Assembly: Multiplex, Theatre and buildings used for transport services.

c.

The Provisions of the said code shall be applicable to the following building-systems, namely; -

a)

Building envelope;

b)

Mechanical systems and equipment’s, including heating, ventilating air-conditioning and service hot

water heating:

c)

Interior and Exterior lighting: and

d) Electric power, motors and renewable energy systems.

d.

The provisions of the said code shall not be applicable to plug loads, equipment’s and parts of

buildings that use energy for manufacturing processes, unless otherwise specified in the said code.

e.

The compliance of the energy performance of a building with the code, shall be ensured by the

owner by following the mandatory requirements of the code and by following either prescriptive method,

Building Envelope Trade off method or whole building performance method, as specified in the code.

143

f.

The compliance with the code shall be verified in the following stages, namely; -

a)

Stage-1: at the time obtaining the construction permit from the Authority;

b)

Stage-2:at the time of obtaining construction completion or occupancy certificate from the Authority;

and

c)

Stage-3:at the time of obtaining the electrical connection from DISCOMs

g. No objection Certificate with respect to the compliance with the Code, for electrical installation shall

be obtained from the State Electrical inspectorate.

Note: This chapter shall be read with the Karnataka Energy Conservation Building code (KECBC) 2018, as

modified from time to time. and the Karnataka Energy Conservation Building Code (KECBC) Rules 2018, as

from time to time

144

Annexure-A

Occupancy Categorization of Buildings for Water and Other Requirement for Fire fighting

Zone-I

Zone-II

Zone-III

GROUP ‘A’: RESIDENTIAL

GROUP ‘E’: BUSINESS

GROUP ‘G’: INDUSTRIAL

A-1 Lodging and Rooming

House

A-2 One or two family private

A-3 Dormitories

A-4 Apartment Houses

A-5 Hotels

A-6 Starred hotels

E-2 Laboratories, outpatient

clinics,

research

establishments,

libraries

and test houses

E-3

Electronic

data

processing

centres,

computer

installations,

information

technology

parks and call centres

E-4 Telephone exchanges

E-5 Broadcasting stations,

T.V. stations and air traffic

control towers

G-3 Buildings used for High hazard industries

GROUP ‘B’: EDUCATIONAL

GROUP ‘G’ INDUSTRIAL

GROUP ‘H’ STORAGE BUILDINGS

B-1 Schools up to senior

secondary level

B-2

All

others/

training

institutions

G-1 Buildings used for Low

hazard industries

G-2

Buildings

used

for

Moderate

hazard

industries

This shall include any building or part of a

building used primarily for the storage or

sheltering of goods, ware or merchandise,

vehicles or animals etc.

GROUP ’C’ INSTITUTIONAL

GROUP ‘J’ HAZARDOUS BUILDINGS

C-1 Hospitals and Sanatoria

C-2 Custodial Institutions

C-3

Penal

and

mental

Institutions

These shall include any building or part thereof

which is used for the storage, handling,

manufacture

or

processing

of

highly

combustible or explosive materials or products

which are liable to burn with extreme rapidity

and/or which may produce poisonous fumes or

explosions

GROUP ‘D’ ASSEMBLY

D-1

Buildings

having

a

theatrical or motion picture

or any other stage and fixed

seats for over 1000 persons

D-2

Buildings

having

a

theatrical or motion picture

or any other stage and fixed

seats up to 1000 persons

D-3

Buildings

without

a

permanent

stage having

accommodation for 300 or

more

persons

but

no

permanent

seating

arrangement

D-4

Buildings

without

a

permanent stage having

accommodation for less

than 300 persons with no

permanent

seating

arrangement

D-5

All

other

structures

including

temporary

structures designed for

145

assembly of people not

covered by D-1 to D-4, at

ground level

D-6 Buildings having mixed

occupancies of assembly

and

mercantile

(for

example, shopping malls

providing facilities such as

shopping,

cinema

theatres, multiplexes and

restaurants/ food courts)

D-7 Underground and elevated

mass rapid transit system

GROUP ‘E’ BUSINESS

E-1

Offices,

Banks,

professional

establishments,

like

offices

of

architects,

engineers, doctors, lawyers,

post offices and police stations

GROUP ‘F’ MERCANTILE

F-1

Shops,

Stores,

departmental stores, markets

(any with covered area up to

500m2)

F-2

Shops,

Stores,

departmental stores, markets

(any with covered area more

than 500m2)

F-3

Underground

shopping

centres

Annexure-BI

Fire Protection Requirements for Buildings in Zone-I Category

Sl.

No

Measures

Group-A: Residential A-3, A-4,

A-5, A-6 (see Note 3)

Group-B:

Educational

B-1, B-2 (see

Note 3 and

23)

Group-C:

Institutional

C-1, C-2, C-3 (see

Note 3 and 23)

I

II

III

IV

V

VI

VII

VIII

VII

VIII

IX

1

Access

P

P

P

P

P

P

P

P

P

P

P

2

Means of Escape

P

P

P

P

P

P

P

P

P

P

P

3

Compartmentation

P

P

P

P

P

P

P

P

P

P

P

4

Refuge Area

X

X

X

P

P

P

X

P

X

P

P

5

Emergency Lights

P

P

P

P

P

P

P

P

P

P

P

6

Exit Signs

P

P

P

P

P

P

P

P

P

P

P

7

Manually

Operated

Electronic

Fire

Alarm

System (MOEFA) with Talk

p

p

p

p

P

P

P

P

P

P

P

146

Back and PA system (see

Note 1)

8

Fire Extinguishers

P

P

P

P

P

P

P

P

P

P

P

9

First Aid Hose Reel

P

P

P

P

P

P

P

P

P

P

P

10

Yard Hydrant

X

X

P

P

P

P

X

P

P

P

P

11

Down Comer

P

X

X

X

X

X

P

X

X

X

X

12

Wet Riser

X

P

P

P

P

P

X

P

P

P

P

13

Automatic Fire Detection

and Alarm System (see Note

2)

X

X

X

P

P

P

X

X

P

P

P

14

Automatic

Sprinkler

System

S

S

FS

FS

FS

FS

S

S

FS

FS

FS

15

Under Ground Tank

X

P4

P5

P6

P5

P6

X

P7

P5

P6

P6

16

Over Head Tank

P8

P9

P10

P10

P11

P11

P12

P13

P11

P11

P11

17

Fire Pumps Near UGT (with

minimum

pressure

of

3.5Kg/cm2

at

remotest

location)

X

P1

5

P16

P17

P16

P16

X

P19

P15

P16

P16

18

Booster

Pumps

at

the

Terrace Tank level with

minimum pressure of 3.5

kg/cm2

P1

4

X

X

X

X

X

P14

X

X

X

X

19

Auto D.G. Set

P

P

P

P

P

P

P

P

P

P

P

20

MCB/ELCB

P

P

P

P

P

P

P

P

P

P

P

21

Hose Boxes

P

P

P

P

P

P

P

P

P

P

P

22

Fireman’s

Grounding

Switch

P

P

P

P

P

P

P

P

P

P

P

Fire Protection Requirements for Buildings in Zone-I Category

Sl.

No

Measures

Group-D: Assembly

D-1 to D-6 (see Note

22 and 23)

Group-E: Business E-1

(see Note 22)

Group-F: Mercantile F-

1, F-2 and F-3 (see

Note 3 and 23)

X

VII

VIII

XI

X

VII

VIII

VI

VII

VIII

XII

1

Access

P

P

P

P

P

P

P

P

P

P

P

2

Means of Escape

P

P

P

P

P

P

P

P

P

P

P

3

Compartmentation

P

P

P

P

P

P

P

P

P

P

P

4

Refuge Area

X

X

P

P

X

X

P

P

X

P

P

5

Emergency Lights

P

P

P

P

P

P

P

P

P

P

P

6

Exit Signs

P

P

P

P

P

P

P

P

P

P

P

7

Manually Operated Electronic

Fire Alarm System (MOEFA)

with Talk Back and PA system

(see Note 1)

P1

P

P

P

P

P

P

P

P

P

P

8

Fire Extinguishers

P

P

P

P

P

P

P

P

P

P

P

9

First Aid Hose Reel

P

P

P

P

P

P

P

P

P

P

P

10

Yard Hydrant

X

P

P

P

X

P

P

P

P

P

P

11

Down Comer

X

X

X

X

X

X

X

X

X

X

X

12

Wet Riser

P

P

P

P

P

P

P

P

P

P

P

13

Automatic Fire Detection and

Alarm System (see Note 2)

P

P

P

P

P

P

P

P

P

P

P

14

Automatic Sprinkler System

S

FS

FS

FS

S

FS

FS

FS

FS

FS

FS

15

Under Ground Tank

P2

4

P5

P6

P6

P7

P24

P5

P6

P24

P6

P5

147

16

Over Head Tank

P9

(P2

5)

P10

P11

P1

1

P9

(P2

5)

P10

P11

P11

P10

P11

P10

17

Fire Pumps Near UGT (with

minimum

pressure

of

3.5Kg/cm2

at

remotest

location)

P1

5

P15

P16

P1

8

P1

9

P15

P16

P18

P15

P16

P16

18

Booster Pumps at the Terrace

Tank level with minimum

pressure of 3.5 kg/cm2

X

X

X

X

X

X

X

X

X

X

X

19

Auto D.G. Set

P

P

P

P

P

P

P

P

P

P

P

20

MCB/ELCB

P

P

P

P

P

P

P

P

P

P

P

21

Hose Boxes

P

P

P

P

P

P

P

P

P

P

P

22

Fireman’s Grounding Switch

P

P

P

P

P

P

P

P

P

P

P

Legend

I. Height 15 m and above up to 35 m

II. Height 35 m and above up to 45 m

III. Height 45 m and above up to 60 m

IV. Height above 60 m

V. Height 15 m and above up to 30 m

VI. Height above 30 m

VII. Height 15 m and above up to 24 m

VIII. Height 24 m and above up to 30 m

IX. Height 24 m and above up to 45 m

X. Height 10 m and above up to 15 m

XI. For D-6 Occupancy

XII. For F-3 Occupancy

P -To be provided.

X -Not to be provided.

S -Sprinklers to be installed in basement, if area of basement exceeds 200 Sq.m.

FS -Fully Sprinklered.

NOTES:

1. MOEFA System shall also include talk-back system and public address system for the occupancies of A-

5 less than 15 m in height if floor area exceeding 1000 m2 on any of the floor, C-1 less than 15 m in height

with plot area more than 1000 m2, D-1 to D-5 above 10 m to 15 m in height, and in all buildings 15 m

and above in height, except for A-3 and A-4 occupancies where these shall be provided for buildings of

height 24 m and above. These shall also be provided in car parking areas more than 300 m2 and in multi-

level car parking irrespective of other areas.

148

2. Automatic detection and alarm system is not required to be provided in car parking area. Such detection

system shall be required in other areas of car parking such as electrical rooms, cabins and other areas.

3. Minimum requirements for Fire Fighting Installations for Buildings less than 15 m in height and

requirements based on floor area and no.of rooms/floors of building, Refer NBC 2016, Part 4, Table 7.

Building above 15 m in height are not to be permitted for occupancies A-1 and A-2.

4. 75,000 Litres capacity

5. 1,50,000 Litres capacity

6. 2,00,000 Litres capacity

7. 50,000 Litres capacity

8. 25,000 Litres capacity

9. 5,000 Litres capacity per Riser

10.

10,000 Litres capacity per Riser

11.

20,000 Litres capacity per Riser

12.

25,000 Litres capacity per Riser

13.

5,000 Litres capacity per Riser if basement area exceeds 200 m2.

14.

Pump Capacity 900 Litre/min.

15.

Provide required number of sets of pumps each consisting of one electric and one diesel pump (stand

by) of capacity 2280 Lpm and one electric pumps of capacity 180 Lpm (see also notes 20 and 21)

16.

Provide required number of sets of pumps each consisting of two electric and one diesel pump (stand

by) of capacity 2280 Lpm and two electric pump of capacity 180 Lpm (see also notes 20 and 21)

17.

Provide required number of sets of pumps each consisting of two electric and one diesel pump (stand

by) of capacity 2850 Lpm and two electric pump of capacity 180 Lpm (see also notes 20 and 21). Lower

levels in high rise buildings 60m or above in height are likely to experience high pressure and therefore, it

is recommended to consider multi-stage, multi-outlet pumps (creating pressure zones) or variable

frequency drive pumps or any other equivalent arrangement.

18.

Provide required number of sets of pumps each consisting of two electric and one diesel pump (stand

by) of capacity 2850 Lpm and two electric pump of capacity 180 Lpm (see also notes 20 and 21)

19.

Provide required number of sets of pumps each consisting of one electric and one diesel pump (stand

by) of capacity 1620 Lpm and one electric pumps of capacity 180 Lpm (see also notes 20 and 21)

20.

One set of pumps shall be provided for each 100 hydrants or part thereof, with a maximum of two

sets. In case of more than one pump set installation, both pump sets shall be interconnected at their

delivery headers.

21.

Alternative to provisions of additional set of pumps, the objective can be met by providing additional

diesel pump of the same capacity and doubling the water tank capacity as required for one set of pumps.

22.

Minimum requirements for Fire Fighting Installations for Buildings less than 10 m in height and D-

7 occupancies, Refer NBC 2016, Part 4, Table 7.

149

23.

Building above 30 m in height not to be permitted for Group B, Group C, Group D and Group F

occupancies.

24.

1,00,000 Litres capacity

25.

Additional 5000 Litres to be provided if basement area exceeds 200 m2

Annexure-BII

Fire Protection Requirements for Buildings in Zone-II Category

Sl.

No

Measures

Group-E: Business E-2

to E-5 (see Note 22)

Group-G-1

: Industrial

Group-G-2

: Industrial

I

II

III

IV

V

VI

VII

VIII

IX

1

Access

P

P

P

P

P

P

P

P

P

2

Means of Escape

P

P

P

P

P

P

P

P

P

3

Compartmentation

P

P

P

P

P

P

P

P

P

4

Refuge Area

X

X

P

P

X

X

X

X

X

5

Emergency Lights

P

P

P

P

P

P

P

P

P

6

Exit Signs

P

P

P

P

P

P

P

P

P

7

Manually Operated Electronic Fire

Alarm System (MOEFA) with Talk

Back and PA system (see Note 1)

P

P

P

P

P

P

P

P

P

8

Fire Extinguishers

P

P

P

P

P

P

P

P

P

9

First Aid Hose Reel

P

P

P

P

P

P

P

P

P

10

Yard Hydrant

X

P

P

P

X

P

X

P

P

11

Down Comer

X

X

X

X

P

X

P

X

X

12

Wet Riser

P

P

P

P

X

P

X

P

P

13

Automatic Fire Detection and Alarm

System (see Note 2)

P

P

P

P

X

P

P

P

P

14

Automatic Sprinkler System

S

FS

FS

FS

S

S

FS

FS

FS

15

Under Ground Tank

P1

P3

P4

P5

X

P2

X

P3

P4

16

Over Head Tank

P6

(P10

)

P7

P8

P8

P8

(P10

)

P6

(P10)

P11

P7

P8

17

Fire

Pumps

Near

UGT

(with

minimum pressure of 3.5Kg/cm2 at

remotest location)

P16

P12

P1

3

P15

X

P16

X

P16

P13

18

Booster Pumps at the Terrace Tank

level with minimum pressure of 3.5

kg/cm2

P19

(P21

)

X

X

X

P19

(P21

)

X

P20

X

X

19

Auto D.G. Set

P

P

P

P

P

P

P

P

P

20

MCB/ELCB

P

P

P

P

P

P

P

P

P

21

Hose Boxes

P

P

P

P

P

P

P

P

P

22

Fireman’s Grounding Switch

P

P

P

P

P

P

P

P

P

150

Annexure-BIII

Fire Protection Requirements for buildings in Zone -III Category

Legend

I. Height 10 m and above up to 15 m

II. Height 15 m and above up to 24 m

III. Height 24 m and above up to 30 m

IV. Height above 30 m

V. Covered area more than 500 m2 (for building height up to 15 m)

VI. Covered area more than 500 m2 (for building height above 15 m)

VII. Covered area more than 500 m2 and up to 1000 m2 (for building height up to 15 m)

VIII. Covered area more than 500 m2 and up to 1000 m2 (for building height above 15 m)

IX. Covered area more than 1000 m2

P -To be provided.

X -Not to be provided.

S -Sprinklers to be installed in basement, if area of basement exceeds 200 Sq.m.

FS -Fully Sprinklered.

NOTES:

1. 50,000 Litres capacity

2. 75,000 Litres capacity

3. 1,00,000 Litres capacity

4. 1,50,000 Litres capacity

5. 2,00,000 Litres capacity

6. 5,000 Litres capacity per Riser

7. 10,000 Litres capacity per Riser

8. 20,000 Litres capacity per Riser

9. 25,000 Litres capacity per Riser

10. Additional 5000 Litres to be provided if basement area exceeds 200 m2

11. 50,000 Litres capacity per Riser

12. Provide required number of sets of pumps each consisting of one electric and one diesel pump (stand by) of

capacity 2280 Lpm and one electric pumps of capacity 180 Lpm (see also notes 17 and 18)

151

13. Provide required number of sets of pumps each consisting of two electric and one diesel pump (stand by) of

capacity 2280 Lpm and two electric pump of capacity 180 Lpm (see also notes 17 and 18)

14. Provide required number of sets of pumps each consisting of two electric and one diesel pump (stand by) of

capacity 2850 Lpm and two electric pump of capacity 180 Lpm (see also notes 17 and 18). Lower levels in

high rise buildings 60m or above in height are likely to experience high pressure and therefore, it is

recommended to consider multi-stage, multi-outlet pumps (creating pressure zones) or variable frequency

drive pumps or any other equivalent arrangement.

15. Provide required number of sets of pumps each consisting of two electric and one diesel pump (stand by) of

capacity 2850 Lpm and two electric pump of capacity 180 Lpm (see also notes 17 and 18)

16. Provide required number of sets of pumps each consisting of one electric and one diesel pump (stand by) of

capacity 1620 Lpm and one electric pumps of capacity 180 Lpm (see also notes 17 and 18)

17. One set of pumps shall be provided for each 100 hydrants or part thereof, with a maximum of two sets. In

case of more than one pump set installation, both pump sets shall be interconnected at their delivery

headers.

18. Alternative to provisions of additional set of pumps, the objective can be met by providing additional diesel

pump of the same capacity and doubling the water tank capacity as required for one set of pumps.

19. Pump Capacity 450 Litre/min.

20. Pump Capacity 900 Litre/min.

21. Additional 450 Litres/min. to be provided if basement area exceeds 200 m2

22. Buildings above 15 m in height not to be permitted for G-3 occupancies

23. Buildings above 15 m in height not to be permitted for Group H Group J occupancies However, buildings

above 45 m in height shall not be permitted for multi-level car parking (MLCP) occupancy.Minimum

requirements for Fire Fighting Installations for Zone III occupancies i.e Group G, Group H and Group J

occupancies should comply with NBC 2016, Part 4, Table 7.

Note: For any further details / clarification NBC, Part 4 shall be referred. Norms and standards in Part 4 of

NBC 2016 shall be overriding in any instance of variance of standards.

152

Annexure-C

1. Water Requirement Criterion: Unless otherwise specified in Annexure B, water requirement for fire

fighting in different categories of occupancies shall be based on following.

Occupancy

Category

Sprinkler

Design

Discharge

Density

(lt./min/Sqm.)

Sprinkler

Design

Area

(Sqm.)

Max.

area

coverage/

Sprinkler

(Sqm.)

No. of House

Streams* Fully

other

Sprinkled

Duration

of

Discharge

(Min.)

Fully

Sprinkled

Wet

Riser

Sprinkled

LEVEL-I

02.5

084

21

24

45

45

LEVEL-II

05.0

360

12

36

60

90

LEVEL-III

10.0

225

09

36

90

90

Note: The discharge through a standard hose stream shall be taken as 567 lt./min.

2. Estimation of Total Water Requirements Fully Sprinklered Buildings

Occupancy

Category

Sprinkler(lt.)

Riser(lt.)

Total(lt.)

Wet

Riser

cum

Down

Comer (lt.)

LEVEL-I

9,450

51,030

60,480

(60,000)

1,02060

(1,00,000)

LEVEL-II

1,08,000

1,02,060

2,10,060

(2,00,000)

2,04,120

(2,00,000)

LEVEL-III

2,02,500

1,02,060

3,04,560

(3,00,000)

3,06,180

(3,00,000)

3. Water Storage Tanks

1. The design of the water storage tanks shall be as laid down in National Building Code of India.

2. The capacity of underground water storage tank shall not be more than85% of the total water requirement.

3. The capacity of overhead tank shall not be less than 15% of the total water requirement.

4. Underground water storage tank be provided in the setback areas.

Occupancy

Category

Under Ground Static Tank

Over Head Tank

Fully Spkd. (lt.)

Riser (lt.)

Fully Spkd. (lt.)

Riser(lt.)

LEVEL-I

50,000

85,000

10,000

15,000

LEVEL-II

1,70,000

1,70,000

30,000

30,000

LEVEL-III

2,50,000

2,50,000

50,000

50,000

4. Riser/Down comer

1. The size of the riser/ down comer shall be such that velocity of flow does not exceed 5 m/second subject

to a minimum of 100 mm. diameter.

2. The number of riser/down comer shall be calculated on the basis that if 30 m. of delivery hose is laid, it

reaches the farthest comer of the remotest compartment on the floor.

3. The riser/down comer shall be provided in the staircase/staircase lobby in such a manner that it does not

obstruct the means of escape.

153

4. Only single headed hydrants shall be used on the riser/down comer.

5. The size of hose to be provided with the internal hydrants shall be 50mmdiameter and with 63 mm diameter

instantaneous male/female couplings.

6. Diffuser branch shall only be provided in the hose boxes.

7. In case of partially sprinklered building tapping from the wet riser is permitted for sprinkler feed.

8. In case of fully sprinklered building separate rising mains and pumps shall bemused for sprinkler system

and wet riser.

5. Selection of Pumps

1. Pumping requirement shall be met by a single pump or combination of pumps.

2. If more than one pump is installed to meet the pumping requirement they shall be so arranged that they

come into operation one after another depending upon fall in pressure in the mains and the combined

pumping capacity shall be 20% more than the actual pumping capacity needed.

3. Jockey pump shall be selected to give minimum 3% and maximum 5% of aggregate pumping requirement

at the same pressure to that of the main pump subject to maximum discharge of 450 LPM.

4. Standard pumps shall only be used having discharge capacity as 180LPM, 2280LPM 2850 LPM & 4550

LPM.

5. The pump shall be capable of giving the pressure as shown in the table below:

Occupancy Category

Pressure* At Terrace Level

Fully Spkd. (Kgf. /Cm2)

Riser (Kgf. /Cm2)

LEVEL-I

3.5

3.5

LEVEL-II

3.5

5.5

LEVEL-III

3.5

7.0

* Orifice plates shall be installed at the hydrants on rising mains / yard

hydrants to ensure that the pressure does not exceed 7 Kgf. /Cm2

154

APPENDIX-I

(see clause 2.123, 3.10.1, 3.10.1.c, 3.10.1.e, 7.3, 12.5)

PROCEDURE FOR REGISTRATION OF VARIOUS STAKE HOLDERS WITH THE AUTHORITY

A. The Stake holders to be registered with the Local Authority are;

1. Land owners who intend to apply for building licence in the plot owned by them.

2. Promoters who are developing Real estate projects within the jurisdiction of the Authority

3. Professionals on record for drawings (to prepare drawings for building licence and for NOCs

from different departments)

4. Professionals on record for supervision (to supervise the works executed in site - civil works

and other services)

5. Professionals who are interested in registering with the Local Authority as licensed

Professionals, to verify the site plan and building plans with reference to the site conditions,

6.

Contractors intending to undertake construction activities within the jurisdiction of the Local

Authority (for Civil, electrical, Plumbing and Sanitation, HVAC, Fire and Emergency services)

B. The following procedure shall be adopted by the Local Authority to register the Stake holders with

the Authority;

1. The Stake holders shall register themselves with the Local Authority by providing their

identity proof, submitting an undertaking cum affidavit (in the format specified in Form XVII)

and payment of the fees as notified by the government.

2. The landowners who intend to apply for building licence in the plot owned by them shall

submit the particulars of the site and the building proposed to be constructed on the site,

while registering with the Local Authority whenever he proposes to develop a building. The

registration shall be done along with the application for building licence.

3. The Promoter who intends to develop real estate project within the jurisdiction of the

Authority, shall do a onetime registration with the Authority.

4. Professionals intending to prepare the required drawings and details (Architectural,

Structural, Services and Environmental), the Professionals intending to prepare the required

drawings and details for obtaining NOCs from the concerned departments and the

Professionals intending to supervise the construction of the various components of the

building shall do a onetime registration with the Local Authority in the respective category

based on the eligibility criteria of Qualification, Experience and Competence, as specified

notified by the government.

5. Professionals who are interested in registering with the Local Authority as licensed

Professionals to verify the site plan and the building plan with reference to the site conditions,

shall do a onetime registration with the Local Authority in the respective category based on

the eligibility criteria of Qualification, Experience and Competence, as notified by the

government.

6. Contractors intending to undertake construction activities within the jurisdiction of the Local

Authority (for Civil, electrical, Plumbing and Sanitation, HVAC, Fire and Emergency services)

shall do a onetime registration with the Authority.

C. The procedure for registration and allotting the registration no. for the stake holders and the fee

payable for licensed professionals shall be as notified by the government.

Government Notification No. UDD 14TTP 2017 dated 30.10.2017 should be followed.

155

APPENDIX-II

(see clause 3.10.2)

DETAILS OF PLANS AND OTHER PARTICULARS TO BE SUBMITTED FOR SANCTION FROM THE LOCAL

AUTHORITY FOR DIFFERENT TYPES OF BUILDINGS.

A – Requirements of Key Plan (see clause 3.11.1)

The key plan shall be prepared in a legible scale showing the location of the plot in the Master Plan containing

the following features within 500m around the plot, namely: -

(a) Location of all existing and proposed roads of the Master Plan mentioning the existing and proposed

width and hierarchy of roads;

(b) Location of all existing Storm Water Drains and other water bodies;

(c) Location / Alignment of overhead or underground HT power supply lines (High Tension Electric lines);

(d) Location / Alignment of sewerage system of ULB;

(e) Location of Railway line / Railway station within 50m from the boundary of the plot;

(f) Index of drawing as specified in Appendix-III.

B – Requirements of Site Plan (see clause 3.11.2)

The site plan shall be prepared in a legible scale, preferably of 1:200 or 1:500 with plan oriented in North-

South direction. The site plan shall contain the following details, namely: -

(a)

All site boundaries with dimensions, by superimposing the survey sketch issued by Revenue

Department, the sketch attached to the title document and the survey sketch prepared by conducting

physical survey of plot using Total Intelligent Station. At least 3 boundary points of all the sketches

should match when superimposed. The innermost boundaries of the plot derived by superimposing all

the sketches shall be considered as the boundary of the plot and the area of the plot within such

boundary shall be considered as the extent of the plot as existing at site;

(b)

Extent of plot, which shall be lesser of the extent as per document, revenue sketch or as existing at

site (as derived from clause ‘a’ above);

(c)

All roads abutting the plot with existing width, proposed width and center line of the road. The road

widening line and building line, if any, shall be marked on the plot, if applicable, showing the portion

of the plot required for road widening; (in case of varying width of the road, the survey of the road using

total intelligent station shall be attached showing the average width of the road as per the provisions

of the ZR)

(d) Portion of Plot to be reserved for Park and Open Spaces and Civic Amenities, if required as per Section

17 of KTCP Act,1961. (e) Land use as per Master Plan and the permitted land use as per Zonal

Regulations;

(f)

Contours of the plot at 1m intervals along with the levels of the adjoining plots and of the abutting

roads;

(g)

Location with dimensions and extent of Kharab lands within the plot;

(h)

Location of roads of the Master Plan passing through the plot, if any;

(i)

Location of all natural features such as trees, water bodies (including wells, ponds, storm water drains,

etc.) quarries including buffer area, etc.;

156

(j)

Location of city level sewerage and H.T. lines passing through the plot including buffer area;

(k)

Eligibility for relaxation of setbacks as per Zonal Regulations;

The following additional details shall be incorporated in the site plan;

(a) Building footprint (portion of the floor plan of the building projecting above the ground) for Ground

coverage and setbacks and the projections in the upper floors, beyond the footprint area (in dotted

line).

(b) Details of constructions provided in the setback area of the plot, including ramps (along with slope of

ramp), driveway and also the parking spaces provided in the open yard.

(c) Details of the over ground and underground services provided such as water supply, sewerage, power

supply and telecommunication system and details of the rain water harvesting system (pipelines,

cables, chambers, manholes, transformer and generator yard / substation, STP and pump room, solid

waste management plant, etc.)

(d) Entry and exit to plot with gate and entry / exit arch details.

(e) Levels contiguous to the building and the boundaries / corners of the plot.

(f) Details for identification of neighbouring properties.

(g) Portion of the plot earmarked as unpaved areas as per clause and chapter wherever applicable.

(c)

Index of drawing as specified in Appendix-III.

C – Requirements of Floor Plan for parking area (see clause 3.11.3)

The following details shall be provided in the plan of the floor showing parking area (for full or portion of the

floor)

(a) Details of entry / exit ramps (ramp from outside the building to the parking floor and ramp between

parking floors, as applicable), such as number of ramps, width of the ramp and slope.

(b) Width of all driveways in the parking area and the width of each of the parking bay abutting the driveway.

(c) Width of columns provided in the parking floors and clear spacing between the columns, location of

staircases, lifts and toilets, with dimensions.

(d) Level of floor with reference to the ground level contiguous to the building or the road level whichever is

considered for the height of the building.

(f) Minimum Setback line from the boundary of the plot and in case of basement floor, the distance between

the boundary and the parking floor periphery.

(g) Details of any other uses proposed within the parking area / floor.

(h) no. of parking bays provided (4-wheeler and 2-wheeler), separately showing single parking, double parking

(one behind the other and one above the other – mechanical parking) and automatic parking devices adopted

such as car lift etc. (along with the approval of the agencies specified by the Authority or notified by the

Government), as applicable.

(i) Index of drawing as specified in Index of drawing as specified in Appendix-III.

D – Requirements of Floor Plans of other uses (see clause 3.11.4)

(1) Residential:

Separate floor plans for each of the typical floors have to be prepared with the following details;

(a) Plan of the dwelling units with areas of sub uses such as foyer, living, dining, bedroom, study, kitchen,

bathroom, WC, toilet, balcony etc. mentioned separately. The carpet area (excluding exterior wall and balcony

of the dwelling unit) and plinth area (including exterior wall and balcony of the dwelling unit) of the dwelling

157

unit has to be mentioned. Area of exclusive balcony and terrace attached to each dwelling unit has to be

mentioned.

(b) Room dimensions and details of doors, windows, ventilators, duct doors and other openings shall be

shown.

(c) All common areas such as staircases and lifts, corridors / passages, service / ventilation ducts, stores,

entrance lobby etc. have to be shown along with dimensions.

(d) Level of floor with reference to the ground level contiguous to the building or the road level whichever is

considered for the height of the building.

(f) Minimum Setback line from the boundary of the plot and balconies projecting beyond the setback line.

(g) No. of dwelling units in each floor (details of all types of dwelling units) and no. of typical floors.

(h) Terrace floor plan with details of open terrace, covered terrace, staircase room, lift / lift machine room,

overhead tank, toilets and other permitted constructions in the terrace floor. (If overhead tank and the lift

machine room is located one level above the terrace floor, the same has to be specifically mentioned in the

Terrace floor plan).

(i)Details of all staircases provided (width, tread, riser, landing, handrail, head room, no. of steps in each

flight).

(j) Details of corridors / passage (minimum width required and width provided, parapet details)

(k) Section lines

(l) Index of drawing as specified in Appendix-III.

(2) Commercial:

Separate floor plans for each of the typical floors have to be prepared with the following details;

(a) Plan of the commercial premises with areas of sub uses such as retail display area, office area, work area,

stores, toilet, etc. mentioned separately. The carpet area (excluding exterior wall and balcony of the premises)

and plinth area (including exterior wall and balcony of the premises) of the premises has to be mentioned.

Area of exclusive balcony and terrace attached to each dwelling unit has to be mentioned.

(b) Room dimensions and details of doors, windows, ventilators, duct doors and other openings shall be

shown.

(c) All common areas such as staircases and lifts, corridors / passages, service / ventilation ducts, stores,

entrance lobby etc. have to be shown along with dimensions.

(d) Level of floor with reference to the ground level contiguous to the building or the road level whichever is

considered for the height of the building.

(f) Minimum Setback line from the boundary of the plot and balconies projecting beyond the setback line.

(g) No. of premises in each floor and no. of typical floors.

(h) Terrace floor plan with details of open terrace, covered terrace, staircase room, lift / lift machine room,

overhead tank, toilets and other permitted constructions in the terrace floor. (If overhead tank and the lift

machine room is located one level above the terrace floor, the same has to be specifically mentioned in the

Terrace floor plan).

(i) Common toilet requirements and provisions made.

(j) Details of all staircases provided (width, tread, riser, landing, handrail, head room, no. of steps in each

flight).

(k) Details of corridors / passage (minimum width required and width provided, parapet details)

(l) Section lines

(j) Index of drawing as specified in Appendix-III.

(3) Other non-residential and non-commercial:

All details similar to that of commercial use except details of no. of premises, carpet area and plinth area of

the independent premises in the floors, within the non-residential and non-commercial uses.

Index of drawing as specified in Appendix-III.

E – Requirements of Sections of Building (see clause 3.11.5)

158

Drawings for the vertical sections cut across the floor plans of the building shall be provided in such a way

that any one or more section drawings shall cut across all the main staircases connecting all the respective

floors of the building.

Section drawings shall also be drawn across all the floors wherever the plan of a floor projects outward or

recedes inward from the lower floor, including section cut across upper Ground floor and lower ground floor,

if applicable.

The section shall also cut across maximum earth cut or fill areas of the plot showing the original ground level

and the formed ground level with the proposed retaining wall details. The section shall also show the general

foundation details of the building.

The section drawings shall mark all the building components and structural elements (foundation, walls, slab

& beams, roof, etc.,) along with the dimensions. The type / specification of material for each component shall

also be mentioned.

The section drawing shall also show the ground levels contiguous to the building, average ground level

contiguous to the building and also the levels of each floor. The section drawing shall also have the floor to

floor height (including mezzanine floor, if applicable) and the height of the building measured from the average

ground level contiguous to the building or the road level, as the case may be, to the terrace floor level or the

roof level, as the case may be.

Index of drawing as specified in Appendix-III.

F – Requirements of Elevation of buildings (see clause 3.11.6)

Elevation drawings shall be drawn for all side elevations showing the structural features of the building visible

on each elevation such as windows and other openings, slab and other architectural projections.

Height of the building with reference to ground level or road level.

Index of drawing as specified in Appendix-III.

G – Requirements of Drawings for all services provided

a – Electrical system including use of alternate energy (see clause 3.11.7(a))

Electrical drawings of all floors showing the location of electrical fixtures, switch boards, etc., both

inside the specific use areas and common areas along with fixture schedule and details of wiring.

Details of electrical ducts (horizontal & vertical), panel room, 11KV sub-station (transformer and

other requirements) and generator facilities.

Single line diagram of the power distribution system.

Details of alternate energy sources proposed.

(as detailed in Clause 5.3)

b- Water Supply system (see clause 3.11.7(b))

Drawings showing Plumbing pipelines and fixtures inside the toilets of specific use areas and

common areas with fixture schedules and pipeline layout.

Pipeline details in Sanitary ducts and connectivity to overhead and sump tanks and connectivity from

Municipal water supply line and water pumping system.

Details of Solar water heating system

(as detailed in Clause 5.3)

c – Rain Water harvesting & ground water recharging system (see clause 3.11.7(c))

Drawings showing Terrace water collection, filtration and connection to sump tank or ground water

recharging pits.

Ground water recharging

(as detailed in Chapter 10&Clause 11.2)

d – Sewerage system (see clause 3.11.7(d))

Drawings showing Drainage pipelines and sanitary fixtures inside the toilets of specific use areas and

common areas with fixture schedules and pipeline layout.

159

Pipeline details in Sanitary ducts and connectivity to Inspection chambers and manholes.

Inspection chambers and manholes in the ground and connectivity to Municipal sewer lines or

sewage treatment plant.

(as detailed in Clause 5.3)

e – HVAC system (see clause 3.11.7(e)

A. Floor Plan

1. Corresponds to submitted or previously approved building plans, including interior layout, room

names & uses, wall & roof insulation R-values, door/window/skylight U-factors

2. Location, volume, and/or rates in CFM of exhaust, make-up air, outdoor air and combustion air

3. Location of equipment & appliances, fire, smoke and ceiling radiation dampers, grease duct wraps

kitchen hood exhaust duct, grease duct enclosures, suppression systems, controls, monitors, etc.

4. Duct sealing requirements stated

5. HVAC distribution via ductwork, sizing, location

a. Metal duct gauge, geometry (round, square, rectangular)

b. Flexible duct diameter, specification

c. Flexible connector diameter, length limitations

d. Underground duct construction, materials, vapours barriers, insulation (R-values),

clearances, cross section, slope

e. Plenum construction materials and locations

B. Sections or Details

1. Insulation for duct or pipe; type, R-value labelling required on plans and in the field

2. Pipe: size, type, hydronic or gas

3. Exhaust rates in CFM

4. Kitchen hood construction information provided

5. Air transfer to corridors only as allowed by code

6. Clothes dryer exhaust duct distribution, length, access doors, etc.

7. Metal duct gauge, geometry, means of fastening, maximum length

8. Transition duct limitations & requirements

9. Grease duct wrap defined for manufacturer and type

10. Hydronic systems have floor assembly which meets minimum under-floor/slab

insulation

and testing requirements

C. Equipment Information

160

1. Equipment schedules or similar provided which define equipment type, capacities, efficiencies,

kitchen hood suppression, as well as associated air rates in CFM

2. Listing shows compliance with ASTM/UL/NFPA/ANSI etc. standards as required to be met by the

code

3. Operation, setback/demand control ventilation/operational controls/interlocks sequencing of all

equipment, and location of controls

4. Provision of economizer indicated if required as part of installation

5. Provision of make-up air

6. Platform & clearance locations for rooftop equipment defined

7. Roof access indicated on plans (if required)

8. Guardrail location and dimensions for roof equipment as required by code

9. Condensate disposal location indicated

10. Duct smoke detection system (if required)

11. Duct smoke detector locations, model defined, installation defined (on return only or return &

supply), sequence of operation defined

12. Control panel location, model

13. Smoke control system

14. Apparatus used (based on submitted calculations)

15. Designate pressure classification of the duct system based on inches w.g.

16. Fire, smoke & ceiling radiation dampers defined for ratings, locations & operations

17. Hydronic systems fully defined for type of, length of, size of, flow rate in pipe; testing requirements

addressed, under floor insulation (shall be addressed in building envelope calculations)

18. Structural weight of rooftop equipment listed on plan and associated structural design accounted

for

D. Calculations

1. Room by room heat loss calculations, not just an overall summary

2. Heat gain calculations may be done by area served by appliance (if AC provided)

3. Transmission plus greater of infiltration or ventilation (furnace sizing)

4. Structural calculations provided to verify that weight of proposed appliances does not exceed load

bearing capability of roof, mezzanine, platform, etc.

5. Volume of exhaust and outdoor air intake are approximately the same

161

6. Smoke control system sizing

7. Outside air required for each room/space where different occupancies are served by one appliance

E. Ventilation Criteria

1. Mechanical ventilation rates used meet minimums listed in SPS Table 364.0403 (or as justified

and

found acceptable by the Dept.)

2. Natural ventilation as allowed by SPS Table 364.0402

3. Exceptions met and clearly stated on plans or in calculations

F. Minimum Clearances

1. Exhaust & outside air intakes to property lines & buildings

2. Distance between intake to exhaust ventilation openings

3. Overhead clearances (suspended appliance)

4. Location of intakes above ground/roof

5. Combustible material clearances to heat-producing appliance

G. Type of fuel used by HVAC equipment

1. Natural Gas

2. Electricity

3. Fuel Oil

4. Wood or pellets

H. Combustion Air

1. Provide calculations used to determine if internal building air can be used, or if outside combustion

air

is required to be provided

2. Define number, location and size of transfer ducts, and louver/grill openings

I. Balancing Report is Required to be On-Site

J. Maintenance & Operation Manuals are Required to be Provided to Owner

(as detailed in Clause 5.3)

H – Requirements of Landscape plan (see clause 3.11.8)

Landscape plan shall be enclosed with the application for building licence in case of building

proposed in plots above 4000 Sqm. The following details shall be provided in the landscape plan

(a) Building foot print and all other constructions proposed in the yard including details of the over ground

and underground services provided such as water supply, sewerage, power supply and

162

telecommunication system and details of the rain water harvesting system (pipelines, cables,

chambers, manholes etc.)

(b) Details of the parking spaces and other concreted or paved areas provided in the yard.

(c) Area reserved for park and open spaces (as per the provisions of Section 17 of KTCP Act

(d) Areas proposed to be developed as green space (including in the areas reserved as park and open spaces)

(e) Type of land landscape, plantation and trees proposed.

(f) Index of drawing as specified in Appendix-III.

Provisions of Part 10 of NBC 2016 are applicable

I – Requirements of Circulation Plan and Traffic study & Impact (see clause 3.11.9.)

Detailed calculations of traffic studies conducted in the locality and the impact of the development proposed,

on the existing traffic scenario.

J – Requirements of Structural Drawings (see clause 3.11.10)

Structural drawings show the structural support components and details of the proposed project,

from the foundation to the rooftop. All structural systems for a building that is designed must be

signed and sealed by a licensed engineer.

Minimum information requirements for structural drawings include, but are not limited to, the

following:

Foundation plans, pile design (with layout), details, sections and all applicable schedules e.g. (pile

schedules)

Slab-on-grade and slab plans, section and details

Cast-in-place concrete floor plans

Floor framing plans, sections and details

Roof framing plans, sections and details

Structural steel framing plans, sections and details

Pre-engineered building design certificates and drawings

Load bearing walls, pads, columns, beams and joists

Pre-cast concrete plans, details and sections

Connection details for all components

Retaining walls

Building mounted antennas

Large, heavy or high signs

Pedestrian bridges, crane runways, and other special structures

●

All other requirements as detailed in Chapter 7

163

K – Requirements of Green Building drawings (see clause 3.11.11)

(as detailed in Chapter 11)

APPENDIX-III

(see Appendix-II)

A – Index of Key Plan

The details to be contained are as follows

1. Name and address of the Applicant and space for signature

2. Name and address of Professional on record for drawing and space for signature

3. Name and address of the Local Authority and space for signature of Commissioner

4. Title of drawing

5. Survey nos., village name, Taluk name and district name where the plot is situated.

6. Existing and proposed width of roads abutting the plot

7. Marking of North direction

8. Date of approval

B – Index of Site Plan;

The details to be contained are as follows

1. Name and address of the Applicant and space for signature

2. Name and address of Professional on record for drawing and space for signature

3. Name and address of the Authority and space for signature of CEO

4. Title of drawing

5. Survey nos., village name, Taluk name and district name where the plot is situated.

6. Existing and proposed width of roads abutting the plot

7. Extent of plot

(a) Total extent (as per document, as per site condition and considered for building licence)

(b) Extent to be surrendered for road widening (whether compensation paid – monetary of in

the form of DR)

(c) Extent to be surrendered for P & OS and CA, if applicable.

(d) Net area for development

(e) Net area considered for FAR calculation

8. Land use analysis

164

(a) Land uses of plot as per Master Plan

(b) Permitted land uses as per Zonal regulations

(c) Existing land use of areas in the plot (% of area for roads, Park & Open Space and Civic Amenities,

if applicable and % of area for development).

9. Summary of area statement of buildings with floor wise area details and FAR (permitted and

proposed including DR / TDR).

10. Ground coverage (permitted and proposed)

11. Setbacks (required and provided)

12. Parking space (required and provided)

13. Public Toilet for Commercial Buildings (required and provided)

14. % of floor areas provided for community facilities, in case of Group housing.

15. Details of Means of Access, if applicable.

16. Marking of North direction

17. Date of approval

C – Index of Floor Plan for parking area

The details to be contained are as follows

1. Name and address of the Applicant and space for signature

2. Name and address of Professional on record for drawing and space for

signature

3. Name and address of the Local Authority and space for signature of Commissioner

4. Title of drawing

5. Survey nos., village name, Taluk name and district name where the plot is situated.

6. Land use analysis

(a) Land uses of plot as per Master Plan

(b) Permitted land uses as per Zonal regulations

(c) Proposed land use for different specific uses in the floor (% of floor area

for different specific uses in the floor, including the proportionate

percentage of common areas)

6. Summary of area statement, including floor area of buildings with floor wise area details required

for calculating parking space requirement.

7. Parking space (required and provided)

8. Date of approval

165

D – Index of Floor Plans of other uses

The details to be contained are as follows

1. Name and address of the Applicant and space for signature

2. Name and address of Professional on record for drawing and space for signature

3. Name and address of the Local Authority and space for signature of Commissioner

4. Title of drawing

5. Survey nos., village name, Taluk name and district name where the plot is situated.

6. Summary of area statement of floor with details of total construction areas, areas considered for

FAR & exempted from FAR, toilet areas, specific use areas & common areas, areas considered for

parking calculations and details of FAR (permitted and proposed including DR / TDR).

7. Schedule of openings

8. Carpet area and plinth area of individual dwelling units and commercial premises in the floor.

9. no. of staircases and lifts (width of each staircase and capacity of each lift)

10. Public Toilet for Commercial Buildings (required and provided)

11. % of floor areas provided for community facilities, in case of Group housing.

12. No. of seats in case of Assembly buildings and no. of beds in case of hospitals and nursing homes.

18. Date of approval

E – Index of Sections of Building

The details to be contained are as follows

1. Name and address of the Applicant and space for signature

2. Name and address of Professional on record for drawing and space for signature

3. Name and address of the Local Authority and space for signature of Commissioner

4. Title of drawing

5. Survey nos., village name, Taluk name and district name where the plot is situated.

6. Date of approval

F – Index of Elevation of buildings

The details to be contained are as follows

1. Name and address of the Applicant and space for signature

2. Name and address of Professional on record for drawing and space for signature

3. Name and address of the Local Authority and space for signature of Commissioner

166

4. Title of drawing

5. Survey nos., village name, Taluk name and district name where the plot is situated.

6. Date of approval

G – Index of Drawings for all services provided

The details to be contained are as follows

1. Name and address of the Applicant and space for signature

2. Name and address of Professional on record for drawing and space for signature

3. Name and address of the Local Authority and space for signature of Commissioner

4. Title of drawing

5. Survey nos., village name, Taluk name and district name where the plot is situated.

6. Summary of the particular service provided (minimum requirements and provisions made)

7. Date of approval

H Index of Landscape plan

The details to be contained are as follows

1. Name and address of the Applicant and space for signature

2. Name and address of Professional on record for drawing and space for signature

3. Name and address of the Local Authority and space for signature of Commissioner

4. Title of drawing

5. Survey nos., village name, Taluk name and district name where the plot is situated.

6. Summary of the landscape details provided (type of landscape and tree plantation made)

7. Date of approval

I – Index of Circulation Plan and Traffic study & Impact

The details to be contained are as follows

1. Name and address of the Applicant and space for signature

2. Name and address of Professional on record for drawing and space for signature

3. Name and address of the Local Authority and space for signature of Commissioner

4. Title of drawing

5. Survey nos., village name, Taluk name and district name where the plot is situated.

6. Summary of the road network provided in the development plan

167

7. Summary of traffic study conducted and impact (critical conditions and provisions made)

8. Date of approval

J – Index of Structural Drawings

The details to be contained are as follows

1. Name and address of the Applicant and space for signature

2. Name and address of Professional on record for drawing and space for signature

3. Name and address of the Local Authority and space for signature of Commissioner

4. Title of drawing

5. Survey nos., village name, Taluk name and district name where the plot is situated.

6. Summary of the structural design and drawings (minimum requirements and provisions made)

7. Date of approval

K – Index of Green Building drawings

The details to be contained are as follows

1. Name and address of the Applicant and space for signature

2. Name and address of Professional on record for drawing and space for signature

3. Name and address of the Local Authority and space for signature of Commissioner

4. Title of drawing

5. Survey nos., village name, Taluk name and district name where the plot is situated.

6. Summary of the Green building requirements (minimum requirements and provisions made for

each category of green building requirement)

7. Date of approval

168

APPENDIX-IV

(see clause 3.10.1(c), 3.10.2)

DETAILS OF PLANS AND OTHER PARTICULARS TO BE SUBMITTED FOR NOCS FROM OTHER

DEPARTMENTS FOR DIFFERENT TYPES OF BUILDINGS.

(as prescribed by the respective departments)

APPENDIX V

(see clause 3.10.6(1))

PROCEDURE FOR EMPANELMENT OF PROFESSIONALS BY THE LOCAL AUTHORITY AND

SELECTION OF LICENSED PROFESSIONALS

The following procedure shall be adopted for empanelling the professionals by the Local Authority

and to select the licensed professional for site inspection to verify the various components of buildings

executed at site.

1. The eligibility of licensed professionals to verify different types of buildings, based on the

qualification, experience and competence fixed as notified by the Government.

2. The Local Authority shall call Expression of Interest from eligible professionals for

empanelment.

3. The Local Authority shall register the professionals for empanelment.

4. The Local Authority shall select the licensed professionals for inspecting the site and

submitting site inspection report as specified in these Byelaws.

5. The licensed professional selected by The Local Authority for inspection of any building site,

shall confirm his acceptance to undertake inspection work and submit site inspection report

(within the timelines notified by government), on the same day of receiving intimation from

The Authority, failing which The Local Authority shall select another licensed professional.

APPENDIX-VI

(see clause 3.10.2)

DETAILS OF DOCUMENTS TO BE SUBMITTED FOR BUILDING LICENCE

The following documents shall be submitted along with the application, namely: -

(a)

RTC / Khata as per date of application;

(b)

Extract of Mutation Register;

(c)

Copy of the Title document such as Sale Deed, etc.;

(d)

Copy of the registered document of GPA / authorisation letter, if applicable;

(e)

Joint development Agreement or MOU and affidavit of all the owners of plots amalgamated for

approval of plot, in case of amalgamated plots;

(f)

Latest Encumbrance Certificate;

169

(g)

Survey sketch issued by Revenue Department for conversion purpose or any other purpose;

(h)

Plot surveyed sketch (using Electronic Total Station)

(i) Conversion Order;

(j)

LAQ NOC;

(k)

All applicable NOCs from other departments;

(l)

Photographs of the site (minimum 4 nos., each from north, south, east and west) showing

the natural and built developments within the site and also the abutting roads;

(m)

Copy of the plot approval obtained (showing the extent of the plot surrendered / to be surrendered

for road widening)

(n)

Latest Property Tax Paid Receipt

(o) Photo and other identity proof of the applicant;

(p)

Specifications of the buildings and

Any other documents specified by the Local Authority or notified by the Government;

Note: 1. In case of licence for the construction of Compound Wall for the boundary of the plot abutting the

road, the documents mentioned in (a), (c), (d), (e), (g), (h), (o) only have to be submitted.

2. In case of licence for the demolition of buildings, the documents mentioned in (a), (c), (d), (e), (n), (o) only

have to be submitted.

APPENDIX-VII

(see clause 3.10.2, 3.10.8(2), 3.14, 3.15.4(1), 3.15.4(3), 3.15.5(a))

VARIOUS FEES FOR SANCTION OF BUILDING LICENCE AND OTHER FEES PAYABLE AS PER

THESE BYELAWS

The following fees shall be paid for sanction of building licence at the rates specified by the Local

Authority or notified by the government.

1. Registration fee payable by Stakeholders

2. Scrutiny fee & Inspection fee, as applicable

3. Licence fee

4. Fee for alteration in plan

5. Infrastructure cess

6. Solid waste management cess

7. Greenery cess

8. Construction and demolition waste disposal cess

9. Labour Welfare cess

10. Refundable Security Deposit

11. Fee for revalidation of licence

12. Fees for respective NOC

Any other fees prescribed by the Local Authority as per KMC Act or as notified by the Government

170

Note:

1. In case of revised licence (for alteration / change of use etc.), the scrutiny fees shall be charged

for the entire building. All other fees shall be charged only for the additional areas, if proposed to

be constructed.

APPENDIX-VIII

(see clause 3.10.5(1 & 2), 3.10.8(1), 3.15.3, 14.2, 14.4.2, 14.4.3, 14.4.4)

TIMELINES FOR DIFFERENT ACTIVITIES FOR ISSUING BUILDING LICENCE, NOCS AND

CERTIFICATION OF WORKS EXECUTED AT SITE AS PER THE CONDITIONS OF NOC, BY

DIFFERENT DEPARTMENTS, FOR DIFFERENT TYPES OF BUILDING.

(As Notified by the government from time to time)

APPENDIX-IX

(see clause 3.10.6(2))

PROCEDURE FOR SITE INSPECTION BY LICENSED PROFESSIONALS AND SUBMISSION OF

SITE INSPECTION REPORT. (As notified by the government)

171

APPENDIX-X

(see clause 3.15.4(1), 3.15.4(2))

VALIDITY PERIOD OF SANCTION AFTER COMMENCEMENT OF WORK AT SITE AND

EXTENSION OF VALIDITY.

1. Validity period for commencement of work – 2 years from the date of sanction

2. Initial validity period for completion of work

a) B1, B2 and B3 buildings – 4years from the date of sanction.

c) B4 buildings – 5 years from the date of sanction for buildings upto G + 9 floors. Additional one

year for every 5 floors or part thereof

b) B5 buildings – 5 years from the date of sanction.

3. Extension of validity

Extension of validity may be permitted by paying yearly revalidation fee as specified by the Local

Authority or as notified by the government.

APPENDIX-XI

(see clause 3.16.5(2))

DETAILS TO BE MAINTAINED IN THE SITE/ SITE OFFICE OF THE CONSTRUCTION SITE.

The person to whom a permit is issued shall, during construction keep, posted in a conspicuous

place on the property in respect of which the permit was issued

a) A copy of the building permit;

b) A copy of the approved drawings and specifications of the property in respect of which the

permit was issued.

c) Where tests of any materials are made to ensure conformity with the requirements of the

Byelaws, records of test data shall be kept available for inspection during the construction of the

building and for such a period thereafter as required by the Authority.

APPENDIX-XII

(see clause 3.16.7(1), 3.16.9(1), 3.17.1(1))

STAGES OF INSPECTION OF VARIOUS COMPONENTS OF BUILDING EXECUTED AT SITE BY

LICENSED PROFESSIONALS

1. Commencement of Mass excavation (beyond 3m depth from natural ground level) and in case of

Retaining wall structures such as touch piles, sheet piling, other RCC structures etc. independent of

the building

2. Commencement of foundation work (marking of orientation of building should be completed

whereby the licensed professional can easily verify the perimeter of the proposed building and the

RCC or masonry footing / foundation work should have commenced)

3. Completion of foundation

4. Completion of each RCC slab (floors and terrace)

5. Exterior masonry completion in each floor

6. Completion of building exterior works and common areas

7. Completion of yard works and services

8. Completion of all works

172

APPENDIX-XIII

EVALUATION OF POWER CONSUMPTION FOR PROJECTS

(Clause 5.3.1.1)

ELECTRICAL LOAD REQUIREMENT FOR THE BUILDING

Details of electrical load considered for electrical fittings and diversity considered for the project to be

updated in chart – 1

Following details to be updated in Chart-1

1. Type of building

a) Residential - (HIG, MIG, LIG B, LIG A & EWS)

b) Commercial

c) Other buildings

2. Specifications of Electrical fixtures

3. Diversity factors

a)

Occupancy Diversity

Residential

●

HIG -80%

●

MIG – 90%

●

LIG B – 100%

●

LIG A & EWS – 100%

Commercial – 100%

Other Buildings -80%

b)

Connection Diversity

Residential

●

HIG, MIG & LIG B – 50%

●

LIG A & EWS – 40%

Commercial (Premises) – 70%

Commercial (Common Area) - 80%

Other Buildings - 60%

c)

Consumption Diversity

Residential

●

HIG, MIG & LIG B – 70%

●

LIG A & EWS – 80%

Commercial (Premises) – 60%

Commercial (Common Area) - 70%

Other Buildings - 50%

173

FOR RESIDENTIAL BUILDINGS

-Following points to be updated in Chart -1, 2a1etc for different dwelling units

Area wise Electrical fixtures details, quantity, Load of each fixtures & diversity as per building type.

Round the clock load for each fixture in each area to be updated.

Following points to be updated in Chart - 2b for common area

Area wise Electrical fixtures details, quantity, Load of each fixtures & diversity as per building type.

Round the clock load for each fixture in each area to be updated.

Summary Chart – 3.

174

Name of Project :

Type of Building :

NAME

SPECIFICATION **

OCCUPANT

DIVERSITY #

CONNECTION

DIVERSITY ##

CONSUMPTION

DIVERSITY ###

WALL FIXING LIGHT FOR ROOMS

WALL FIXING LIGHT FOR TOILETS

WALL FIXING TUBE LIGHT

CEILING TUBE LIGHT

CEILING CHANDILIER

CEILING LIGHT FOR BALCONY

DINNING WASH LIGHT

STAIR CASE LANDING LIGHT

NIGHT LAMP

CEILING FAN

TABLE FAN

PEDESTAL FAN

EXHAUST FAN FOR TOILET

EXHAUST FAN FOR OTHERS

EXHAUST POINT FOR KITCHEN HOOD

-EXHAUST FAN / ELECTRIC CHIMNEY

6 AMPS SWITCH/SOCKET

16 AMPS SWITCH/SOCKET

CALLING BELL/ VEDIO DOOR PHONE

6 AMPS SWITCH/SOCKET FOR

COMPUTER WITH MONITOR,

PRINTER/SCANNER, WIRELESS

6 AMPS SWITCH/SOCKET FOR TV,

SET TOP BOX/ DVD/ PLAY STATION &

HOME THEATER

TOP BOX

BOX

16 AMPS SWITCH/SOCKET FOR FRIDGE

16 AMPS SWITCH/SOCKET FOR GRINDER/ MIXER

16 AMPS SWITCH/SOCKET FOR MICRO WAVE OVEN

16 AMPS SWITCH/SOCKET FOR WASHING MACHINE

CONDITIONER

NOTE:

I * TYPE OF BUILDING:

a) RESIDENTIAL (HIG, MIG, LIG I, LIG II & EWS)

b) COMMERCIAL

c) OTHER BUILDING

II ** SPECIFICATIONS:

a) (As per Annexure 1)

III # MAXIMUM PERMITTED OCUPANT DIVERSITY (based on type of building)

a) Residential (HIG) -Upto 30%

b) Residential (MIG) -Upto 20%

c) Residential (LIG I) -Upto 10%

d) Residential (LIG II & EWS) -Nil

e) Commercial -Nil

f) Other Building -Upto 20%

IV

a) Residential (HIG, MIG & LIG I) -Upto 50%

b) Residential (LIG II & EWS) -Upto 60%

c) Commercial for Premises -Upto 30%

d) Commercial Common Area -Upto 20%

e) Other Building -Upto 40%

V

a) Residential (HIG, MIG & LIG I) -Upto 70%

b) Residential (LIG II & EWS) -Upto 80%

c) Commercial for Premises -Upto 40%

d) Commercial Common Area -Upto 30%

e) Other Building -Upto 50%

VI LED LIGHTS SHALL BE CONSIDERED

VII MAXIMUM STAR RATED FITTINGS AND EQUIPMENTS SHALL BE CONSIDERED

VIII INVERTER TYPE STAR RATED ENERGY EFFICIENT AIRCONDITIONERS SHALL BE CONSIDERED

IX VFD SHALL BE USED FOR THE EQUIPMENTS/ PUMPS WHERE EVER IS POSSIBLE

## MAXIMUM PERMITTED CONNECTION DIVERSITY (diversity considered for each fitting to be mentioned as

per Annexure 2)

### MAXIMUM PERMITTED CONSUMPTION DIVERSITY (diversity considered for each fitting to be mentioned

as per Annexure 3)

DETAILS OF ELECTRICAL LOAD CONSIDERED FOR ELECTRICAL FITTINGS AND DIVERSITY CONSIDERED FOR

THE PROJECT (Chart - 1)

OTHER

EQUIPMENTS

ELECTRICAL

POINTS

QUANTI

Y (NOS)

LOAD/

FIXTUR

E

(WATTS

)

REMARKS

DESCRIPTION OF ELECTRICAL FIXTURE

LIGHTS

FANS

POWER

POINTS

(Type of

Building) *

175

PEAK LOAD CHART FOR DWELLING UNIT IN RESIDENTIAL BUILDING (Independent Houses/ Apartment Buildings)- CHART 2a1

Updated On: -----

Name of Project :

Type of Building :

OCCUPA

NT

CON

NECT

ION

CONS

UMPTI

ON

0-

1

1-

2

2-

3

3-

4

4-

5

5-

6

6-

7

7-

8

8-

9

9-

10

10-

11

11-

12

12-

13

13-

14

14-

15

15-

16

16-

17

17-

18

18-

19

19-

20

20-

21

21-

22

22-

23

23-

24

0-

1

1-

2

2-

3

3-

4

4-

5

5-

6

6-

7

7-

8

8-

9

9-

10

10-

11

11-

12

12-

13

13-

14

14-

15

15-

16

16-

17

17-

18

18-

19

19-

20

20-

21

21-

22

22-

23

23-

24

LIGHT

WALL FIXING LIGHT

6 AMPS SWITCH/SOCKET

CEILING FAN

CEILING CHANDELIER

WALL FIXING LIGHT

WALL TUBE LIGHT

6 AMPS SWITCH/SOCKET FOR TV, SET-TOP

BOX/ DVD/ PLAY STATION & HOME THEATER

6 AMPS SWITCH/SOCKET

CEILING LIGHT

6 AMPS SWITCH/SOCKET

CALLING BELL

CEILING FAN

WALL FIXING LIGHT

WALL TUBE LIGHT

DINING WASH LIGHT

IRON BOX - STEAM IRON

6 AMPS SWITCH/SOCKET

CEILING FAN

WALL FIXING LIGHT

WALL TUBE LIGHT

EXHAUST POINT FOR KITCHEN HOOD -EXHAUST

FAN / ELECTRIC CHIMNEY

6 AMPS SWITCH/SOCKET

16 AMPS SWITCH/SOCKET-1 FRIDGE

16 AMPS SWITCH/SOCKET-2 MIXER

16 AMPS SWITCH/SOCKET-3 MICRO OVEN

6 AMPS SWITCH/SOCKET (for water purifier)

WALL FIXING LIGHT

16 AMPS SWITCH/SOCKET (GRINDER/MIXER)

16 AMPS SWITCH/SOCKET

CEILING FAN

WALL FIXING LIGHT

WALL TUBE LIGHT-T5

NIGHT LAMP-LED

6 AMPS SWITCH/SOCKET (for TV, set-top box,

home theatre)

6 AMPS SWITCH/SOCKET (for LAP TOP/MOBILE)

16 AMPS SWITCH & SOCKET (for AC)

WALL FIXING LIGHT

EXHAUST FAN

6 AMPS SWITCH/SOCKET

CEILING LIGHT

6 AMPS SWITCH/SOCKET

CEILING FAN

WALL FIXING LIGHT

WALL TUBE LIGHT

NIGHT LAMP-LED

6 AMPS SWITCH/SOCKET (for TV, set-top box,

home theatre)

6 AMPS SWITCH/SOCKET (for LAP TOP/MOBILE)

16 AMPS SWITCH & SOCKET (for AC)

WALL FIXING LIGHT

EXHAUST FAN

.

WALL FIXING LIGHT

EXHAUST FAN

KW

* Total load (in watts) shall be considered for I (Round the clock load (in watts) before diversity) for the assumed period for each electric fixture.

KW

** The load (in watts) considered for each period in I shall be multiplied by all the three diversities (ocupant, connection and consumption diversity) to arrive at the loa

KW

# Load / Fixture (in watts) and values for diversity is taken from Chart 1.

OTHER BED

TOTAL LOAD IN WATTS

TOTAL LOAD IN KILO WATTS

KITCHEN

UTILITY

MASTER BED

M.BED TOILET

BALCONY 2

SPACE

ELECTRICAL FIXTURE

QUANTIY

(NOS)

LOAD/

FIXTURE #

(IN WATTS)

TOTAL

LOAD (IN

WATTS)

DIVERSITY FOR

I -ROUND THE CLOCK LOAD (in watts) BEFORE DIVERSITY *

II -ROUND THE CLOCK LOAD (in watts) AFTER DIVERSITY **

MAIN ENTRAN

FOYER/SRVI

CE ENTRY

LIVING

BALCONY 1

DINING

OTHER

TOILET

POWDER ROO

Total No. of Dwelling Units

ALLOTED LOAD PER DWELLING UNIT

Peak hour Load Before Diversity per dwelling unit

Peak hour Load After Diversity per dwelling unit

Note:-

176

Name of

Project :

Type of

Building :

0-1

1-2

2-3

3-4

4-5

5-6

6-7

7-8

8-9

9-10 10-11 11-12 12-13 13-14 14-15 15-16 16-17 17-18 18-19

19-20

20-21

21-22 22-23 23-24

CEILING TUBE LIGHT

WALL FIXING LIGHT

CEILING FAN

6 AMPS

CEILING TUBE LIGHT

WALL FIXING LIGHT

EXHAUST FAN

6 AMPS SWITCH/SOCKET

WALL FIXING LIGHT

EXHAUST FAN

CEILING TUBE LIGHT

WALL FIXING LIGHT

WALL FIXING LIGHT

WALL TUBE LIGHT

CEILING FAN

EXHAUST FAN

COMPUTER WITH

MONITOR,

PRINTER/SCANNER

TV, SET-TOP BOX

6 AMPS SWITCH/SOCKET

16 AMPS

CEILING LIGHT

WALL LIGHT

CEILING CHANDELIER

CEILING FAN

WALL FAN

6 AMPS SWITCH/SOCKET

16 AMPS

CEILING FAN

WALL TUBE LIGHT

WALL LIGHT

FIRE PANELS

16 AMPS

D.V.R

CAMERA

MONITOR

CEILING FAN

WALL TUBE LIGHT

COMPUTER WITH

MONITOR,

PRINTER/SCANNER

6 AMPS SWITCH/SOCKET

CEILING LIGHT

CEILING LIGHT

WALL / CEILING LIGHT

Domestic Water supply

Domestic Water Pumps for

STP Treated Water Pumps

Well to Sump Pumps

Pump Room Drain Pumps

Basement Drain Pumps

Heat Pumps for Hot Water

Hot water circulation/

STP Pumps (Complete set

Swimming Pool Pumps

Fire Pumps

Building Focus Lights

Street Lights

Landscape Lights

Covered Car Park Lights

Driveway and Yard Lights

PASSANGER LIFT

SERVICE LIFT

CEILING LIGHT

WALL MOUNTED LIGHT

6 AMPS SWITCH/SOCKET

CEILING TUBE LIGHT

WALL MOUNTED LIGHT

CEILING FAN

EXHAUST FAN

6 AMPS SWITCH/SOCKET

CEILING LIGHT

6 AMPS SWITCH/SOCKET

16 AMPS

CEILING LIGHT

16 AMPS

CEILING LIGHT

16 AMPS

PEAK LOAD CHART FOR COMMON AREAS (INCLUDING CLUB HOUSE) IN RESIDENTIAL APARTMENTS BUILDING - CHART 2b

PARKING AREA

ELECTRICAL

ROOM

COMMON

PASSAGE/

CORRIDOR IN

TERRACE

FLOOR

STAIR CASE IN

ALL FLOORS

TABLE TENNIS

JACUZZI (SPA)

SUNA ROOM

STEAM ROOM

PUMPS

OTHER

UTILITIES

LIFTS

CLUB HOUSE

SQUASH

COURT

ROOMS

MAIN

ENTRANCE

LOBBY

SECURITY &

DRIVER'S

ROOM

COMMON

TOILETS

COMMOM

AREA

ROUND THE CLOCK LOAD (in watts) AFTER DIVERSITY

Updated On: --------

SPACE

ELECTRICAL POINTS

QUAN

TIY

(NOS)

LOAD/

FIXTU

RE (IN

TOTA

L

LOAD

(IN

FIRE CONTROL

ROOM /

C.C.T.V ROOM

MANAGER/

OFFICE ROOM

DIVER

SITY

177

CEILING LIGHT

EXHAUST FAN

6 AMPS SWITCH/SOCKET

CEILING FAN

CEILING TUBE LIGHT

COMPUTER WITH

MONITOR,

WALL TUBE LIGHT

16 AMPS SWITCH &

6 AMPS SWITCH/SOCKET

CEILING FAN

WALL MOUNTED FAN

CEILING LIGHT

WALL LIGHT

CEILING LIGHT

16 AMPS

EXHAUST FAN

CEILING FAN

CEILING LIGHT

WALL LIGHT

16 AMPS SWITCH &

16 AMPS SWITCH &

SOCKET (for Tread Mill)

6 AMPS SWITCH/SOCKET

EXHAUST FAN

CEILING FAN

CEILING LIGHT

WALL MOUNTED FAN

WALL LIGHT

16 AMPS SWITCH &

6 AMPS SWITCH/SOCKET

CEILING FAN

CEILING LIGHT

WALL MOUNTED FAN

WALL LIGHT

16 AMPS SWITCH &

6 AMPS SWITCH/SOCKET

CEILING FAN

CEILING LIGHT

WALL LIGHT

16 AMPS SWITCH &

6 AMPS SWITCH/SOCKET

SPEAKAR

CEILING LIGHT

WALL LIGHT

WALL MOUNTED FAN

SOUND SYSTEM/ VIEDIO

PROJECTOR

16 AMPS SWITCH &

CEILING LIGHT

WALL LIGHT

WALL /CEILING FAN

16 AMPS SWITCH &

6 AMPS SWITCH/SOCKET

CEILING FAN

CEILING LIGHT

WALL LIGHT

16 AMPS SWITCH &

EXHAUST FAN

16 AMPS

6 AMPS SWITCH/SOCKET

CEILING FAN

CEILING LIGHT

WALL LIGHT

16 AMPS

6 AMPS SWITCH/SOCKET

EXHAUST FAN

CEILING FAN

CEILING LIGHT

WALL LIGHT

16 AMPS SWITCH &

6 AMPS SWITCH/SOCKET

EXHAUST FAN

CEILING FAN

CEILING LIGHT

WALL LIGHT

16 AMPS SWITCH &

6 AMPS SWITCH/SOCKET

CEILING CHANDELIER

EXHAUST FAN

KW

Note:-

From To

From To

From To

P

S

From To

Fire Pumps

Well Pumps

Solar Pumps

Treated water

STP Pumps

Rain Water

Drain Pumps

Domestic Cold

Domestic Hot

Lift operation timing

shall be considered

as follows

Pumps operation timing

shall be considered as

follows

Percenta

ge of

TIMING

Percenta

ge of

TIMING

Floor

TIMING

LIFT

The following factors shall be

considered for Common

Passage Lighting for all

Floors

DESCRIPTION

TIMING

LIBRARY/READI

NG ROOM

AYURVEDIC

WELLNESS

CENTER

GYMNASIUM

SOCIETY

ASSOCIATION

ROOM

The following factors shall be

considered for Parking Area

Lighting

TOTAL LOAD AFTER DIVERSITY IN KILO WATTS

LAUNDRY

PARTY HALL/

DINNING

INDOOR

GAMES

(SENIOR

BOARDS

GAME,CARROM

BOARDS

GAME,BILLIARD

S POOL,PLAY

Peak Hour consumption

COMMON AREA

TOTAL LOAD AFTER DIVERSITY IN WATTS

LADIES &

GENTS BEAUTY

PARLOUR

AEROBIC/

YOGA/

MEDITATION

ROOM

MINI THEATER

STUDENT

ACTIVITY ROOM

COFEE SHOP

/PANTRY

178

Energy Efficient Lighting

SUMMARY OF POWER LOAD AND CAPACITY OF TRANSFORMER, DIESEL GENERATOR AND SOLAR PV PANEL FOR RESIDENTIAL APARTMENT BUILDINGS - CHART 3

Updated on: -------------

Name of Project :

Type of Building :

0-1

1-2

2-3

3-4

4-5

5-6

6-7

7-8

8-9

9-10

10-11

11-12

12-13

13-14

14-15

15-16

16-17

17-18

18-19

19-20

20-21

21-22

22-23

23-24

1

1 BHK (Chart 2a1)

2

2 BHK (Chart 2a2)

3

3 BHK (Chart 2a3)

4

5

6

Common area &

Parking including

Club House (2b)

STAGE -1 (25% load for premises and 60% load for common areas)

STAGE -2 (50% load for premises and 80% load for common areas)

STAGE -3 (75% load for premises and 100% load for common areas)

FINAL STAGE (100% load for premises and 100% load for common areas)

TOTAL NO OF

DWELLING UNITS

SUMMARY

Kw

SOLAR PV PANEL REQUIREMENT AS PER BUILDING BYELAW (5% of the Total Power Consumption per Day is Considered)

Kva

Kva

Kva

Kva

Kva

Kva

Standard DG Sizes in KVA : 30, 35, 40, 50, 62.5, 70,

82.5, 100, 125, 140, 160, 180, 200, 225, 250, 275, 300,

320 365 400 500 600 625 650 750 810 1010 KVA

Total Load = [ O /0.85 ] Kva ( P )

D.G. Capacity = [ P/0.85 ] Kva ( Q )

Standard Transformer Sizes in KVA : 63, 100, 250, 315,

500, 630, 750, 800, 1000 KVA (check the availability of

proposed sizes with MESCOM/ standard suppliers)

DG CAPACITY REQUIRED ( Q ) Kva

DG LOAD CONSIDERED

DG PROPOSED - 1

DG PROPOSED - 2

TOTAL PEAK LOAD CONSIDERED ( O ) K

TOTAL PEAK LOAD CONSIDERED ( P ) Kv

Transformer Proposed

Peak Hour Load

(Kw)

Solar PV Panel Requirement (Considering 1 Kw Solar PV Panels shall

produce Average 4 Kwh (Units) per Day)

Kw

Total Power Consumption per Day as per this Summery Load Chart

Kwh (Units)/

Day

Kwh (Units)/

Day

Actual Power Consumption shall be considered as 50% of the summery

Kwh (Units)/

Day

Premises Load for 100% Ocupancy ( A )

Premises Load for 25% Ocupancy ( B )

Premises Load for 50% Ocupancy ( C )

Premises Load for 75% Ocupancy ( D )

Common area & Parking including Club House Load 100% ( E )

Total

Consumption

Kwh (Units) per

Day

Remarks

Allotted Load

(Kw)

Peak Hour Load

After Diversity

(Kw)

ROUND THE CLOCK LOAD (IN KW) AFTER DIVERSITY

Sl.

No. Premises/Facilities

No. of units

Connected Load

(Kw)

Total

Connected Load

(Kw)

Kw

NOTE:

5% of the Actual Power Consumption considered for Solar PV Panels

Final Rounded Off Quantity Solar PV Panels shall be provided

Total Load = [ A+E ] Kw ( O )

Total Load = [ B+(E x 0.6) ] Kw ( F )

Total Load = [ F /0.85 ] Kva ( G )

D.G. Capacity = [ G/0.85 ] Kva ( H )

Total Load = [ C+(E x 0.8) ] Kw ( I )

Total Load = [ I /0.85 ] Kva ( J )

D.G. Capacity = [ J/0.85 ] Kva ( K )

Total Load = [ D+E ] Kw ( L )

Total Load = [ L/0.85 ] Kva ( M )

D.G. Capacity = [ M/0.85 ] Kva ( N )

179

Electric lighting is a major energy consumer in a building. Enormous energy saving are possible using

energy efficient equipment, effective control and careful/proper design. Using less electric lighting reduces

heat gain thus saving air-conditioning energy and improving thermal comfort. Electric lighting design also

strongly affects visual performance and visual comfort by aiming to maintain adequate and appropriate

illumination while controlling reflection and glare.

By installing new lighting technologies, we can reduce the amount of electricity consumed and energy

cost associated with lighting.

There are several types of energy efficient lighting and affordable lighting technology. The following are a

few examples of energy-saving opportunities with efficient lighting.

1. Installation of Compact Fluorescent Lamps (CFLs) in place of Incandescent Lamps.

CFL use a different, more advanced technology than incandescent light bulbs and come in a range of

styles and sizes based on brand and purpose. They can replace regular, incandescent bulbs in almost any

light fixture including globe lamps for bathroom vanity, lamps for recessed lighting, dimming and 3 way

functionality lights. CFLs use about 2/3 less energy than standard incandescent bulbs, give the same amount

of light, and can last 6 to 10 times longer.

2. Installation of Energy Efficient Fluorescent Lamps in place of Conventional Fluorescent lamps.

The recommended style of fluorescent lighting is a T-8. T-8 lights are most cost effective. They usually are

30% to 40% more efficient than standard T-12 fluorescent lamps, which have poor colour rendition and cause

eye strain. T-8 lamps provide more illumination, better colour and don’t flicker. T-5 lamps are the most energy

efficient and also tend to transmit the best colour.

Each style of fluorescent lamp cannot function without a ballast. A ballast is an electrical device used in

fluorescent lamps to regulate starting and operating charecteristics of the lamp. Some ballast are magnetic

whereas other are electronic. Electronic high frequency ballasts are now standard for most fluorescent lights.

Due to differences in wattage between the types of lights, if converting from a t-12 to T-8 light, one must also

change the type of ballast being used.

3. Installation of Energy Efficient LED Lamps in place of Conventional Fluorescent & Fluorescent

lamps.

LEDs are solid state semiconductor devices and are more energy efficient than even CFLs. They produce

little heat and higher quality lighting than any other lamp. At the time of inception the usage of LEDs

was limited as single bulb indicators in electronic circuits. LED lamps use 75 percent less energy than

traditional incandescent and 50 percent less energy than that of a CFL. They can last 8-25 times longer

compared to incandescent and up to four times longer than a CFL. Unlike incandescent and CFLs, LED

lamps produce no heat and hence they are cool enough to touch. But, these are more expensive; however,

they are affordable over the long run.

4. Installation of Occupancy /Motion sensors to turn lights ON and OFF where appropriate.

Lighting can be controlled by occupancy sensors to allow operation whenever someone is within the area

being scanned. When motion can no longer be detected, the lights shut off.

180

Lighting Energy Savings Potential with Occupancy Sensors

Application

Potential Energy Savings

Offices (Private)

25-50%

Offices (Open areas)

20-25%

Restrooms

30-75%

Corridors

30-40%

Storage areas

45-65%

Meeting Rooms

45-65%

Conference Rooms

45-65%

Warehouses

50-75%

Source: U S Department of Energy

5. Use an automated device, such as a key tag system, to regulate the electric power in a room.

The key tag system uses a master switch at the entrance of each guest room, requiring the use of a

room key-card to activate them. Using this technique, only occupied rooms consume energy because

most electrical appliances are switched off when the key-card is removed (when the guest leaves the

room). Along with lighting, the heating, air conditioning, radio and television may also be connected to

the master switch. This innovation has a potential savings of energy.

6. Offer Nightlights to prevent the bathroom lights from being left ON all night.

Many guests opt to have a light on while they sleep. By turning the bathroom light On and leaving

the bathroom door cracked open, guests are able to find their way through an unknown room in the

middle of the night. Those who are accompanied by children may often do the same to comfort their child.

By offering a nightlight, the energy used to power a bathroom light during the night time can be avoided

and guest will still be able to feel comfortable in unfamiliar territory.

7. Replace the Sign Boards with Light Emitting Diode (LED) Sign boards.

The development of light emitting diode (LEDs) has allowed the replacement of signage lighting with

a more energy efficient alternative. Multiple LEDs, Properly configured, produce equivalent lighting and

consume 95% less electricity than incandescent bulbs and 75% less than energy efficient compact

fluorescent lamps. A major benefit is the 20-year life cycle rating of LEDs; they virtually eliminate

maintenance.

Comparison of Three models of signages

Incandescent

Fluorescent

LED

Input Power (Watts)

40

11

2

Yearly Energy (kWH)

350

96

18

Lamp Life (Years)

0.25-0.5

1-2

10+

8. Use High Efficiency (HID) Exterior Lighting

High Intensity discharge (HID) lighting is much more efficient and preferable to incandescent, quarts-

halogen and most fluorescent light fixtures. HID types (from least to most efficient) include mercury

vapor, metal halide and high pressure sodium. Mercury vapour is seldom used anymore. Both metal

181

halide and high pressure sodium are excellent outdoor lighting systems. High pressure sodium has a

pink-orange glow and used when good colour rendition isn’t critical. Metal halide, though less efficient,

provides clean white light and good colour rendition.

9. Add light controls such as Photosensors or time clocks

Photo sensors controls, monitors daylight conditions and allow fixtures to operate only when needed.

Photo sensor detect the quantity of light and send a signal to a main controller to adjust the lighting.

Photo sensors are commonly used with outdoor lighting to automatically turn lights ON at dusk and OFF

at dawn, a very cost effective control device. This helps to lower energy costs by ensuring that unnecessary

lighting is not left on during daytime hours.

Time controls save energy by reducing lighting time of use through pre-programmed scheduling. Time

clock equipment ranges from simple devices designed to control a single electrical load to sophisticated

systems that control several lighting zones. They are one of simplest, least expensive and most efficient

energy management devices available.

ENERGY EFFICIENCY IN HEATING, VENTILATION AND AIR CONDITIONING (HVAC) SYSTEMS

⮚

HVAC systems should comply with Karnataka Energy Conservation Building Code (ECBC)

2014, Clause 4. Refer Clause 4.2 for Mandatory Requirements like Natural Ventilation,

Minimum Equipment Efficiencies, Controls, Piping, Ducts, System Balancing, and Condensers.

Also refer Clause 4.3 for Prescriptive Requirements of HVAC System.

TIPS FOR THE SELECTION OF HVAC STSTEMS

⮚

HVAC system Heat load calculations shall be as per latest American national standards institute

(ANSI)/American society for heating, refrigerating and air conditioning engineers (ASHRAE)/Indian

society for heating, refrigerating and air conditioning engineers (ISHRAE).

⮚

HVAC Systems shall be categorized as under:

a.

Small sized - “0” to “300” TR – Residential/Commercial applications.

b. Medium sized - “300” to “1000” TR – Residential/Commercial/Industrial applications.

c.

Large sized – between “1000” to “3000” TR and above – Commercial as well as Industrial

applications.

⮚

Small sized:

a.

For Split systems up to 2 TR, minimum Energy Efficiency Ratio (EER) for the fixed speed air

conditioners and Indian Seasonal Energy Efficiency Ratio (ISEER) for inverter based systems

shall be mandatory. EER above 3.5 and ISEER above 4.0 shall be advised for energy rated

buildings. (minimum 3 star ratings shall be used)

b. For ducted split systems ranging from 3 TR to 17 TR an IkW of 1.2 kW per TR shall be advised.

(Original Manufacturers Engineering data/ Catalogue should be checked for the efficiency of the

system)

c.

VRF/VRV systems shall have a minimum Co Efficient of Performance (COP) of above 3.7 for the

cooling only machines and 4.0 for heat pumps. (should check with Engineering Data/ Catalogue)

182

⮚

Medium sized:

a.

Apart from aforementioned minimum criteria, an IkW of less than 1.0 kW per TR shall be

mandatory.

b. Commercial applications shall have systems with secondary refrigerants – such as chilled water

– where more than 5000 Sqm of area shall be air conditioned, to achieve an IkW of less than 1.0

c.

Heat

recovery

shall

be

extensively

utilized

among

conditioned

spaces

such

as

Hospital/Hospitality,

Health

care,

Pharmaceuticals,

Manufacturing

and

other

Industries/applications where fresh air requirements are huge and mandatory.

d. An exclusive diversity of 20% shall be mandatory for systems which shall cater more than 5000

Sqm’s of conditioned space.

e.

HVAC systems shall be controlled by intelligent Building management systems to save on energy

and to maintain IAQ. The same shall be mandatory.

⮚

Large sized:

a.

Systems which operate on waste heat shall be installed wherever possible.

b. Heat recovery systems shall be mandatory wherever possible.

c.

An IkW of less than 1.0 kW per TR shall be mandatory along with intelligent BMS.

⮚

General Guidelines for Commercial and public spaces:

a.

An average indoor temperature shall be set at 24 to 26 Deg C. for summers and 21 to 23 Deg C.

for extreme winter. HVAC systems shall be designed and commissioned accordingly to save on

energy.

b. A CO2 concentration of less than 1000 ppm shall be advised for public spaces. (Fresh Air supply

is required)

BUREAU OF ENERGY EFFICIENCY (BEE) STAR LABELS- TIPS

●

BEE Star Label – Small Label for Tv’s, Computers/ laptops, fans and tube lights.

●

BEE Star Label – Big Label for Refrigerators, Air conditioners, geysers and washing machines.

●

Look for Stars on an appliance model, more stars means more electricity saving.

●

Look for the year on the label as star ratings change periodically when standards improve. A BEE 5

star rated model in 2013 may be equivalent to BEE ¾ star model in 2014.

●

Although BEE star rated appliances do comply with Indian Standards, but higher star rating does

not mean better quality.

●

BEE star rating is available in following home appliances: Refrigerators, Air Conditioners, Water

heaters, T8 Tube Lights, 1200 mm sweep ceiling fans.

183

APPENDIX-XIV

A.

REQUIREMENT OF NUMBER AND TYPE OF LIFTS (see clause 5.3.1.2)

PRELIMINARY DESIGN FOR LIFTS - THE PASSENGER HANDLING CAPACITY OF LIFTS (Ref: NBC

2016, PART 8 SECTION 5A, Clause 4)

** 1) Considering buildings with average floor height of 3.0 m.

2) For any other building, the speed of the lifts will have to be validated against the total population and

travel height of the building.

1. Population

The population of the building is estimated using the Net usable area (NUA). The NUA excludes circulation

areas (stairs, corridors, foyers, etc), structural instructions (columns, ducts, etc) and facilities (pantry,

kitchens, toilets, conference rooms, training rooms, server rooms, storage areas, etc).

Table 1 gives typical values for the density of population.

Table 1 occupancy Area Per Person in office

Buildings

Sl No.

Building

type

Open

Plan/Hall

seating

cellular

Plan/

Cabins

i

Premium

10m2

12m2

ii

Regular

8m2

10m2

iii

Low end

5m2

8m2

Date:

C

T. Stops

N

H*

L

D

A

B = Lift Speed**

S

tv

tp

tc

to

T

RTT

P

Full speed

Up

Full speed

Down

a

b

c

d

e

f

g

h

i

j

k

l

m

n

o

p

q

r

s

t

u

v

w

x

y

z

0.0

2

3

3

0

0

0.0

2

3

3

0

0

0.0

2

3

3

0

0

0.0

2

3

3

0

0

#

**

Note:

*

Project Name

Configuration

of Lifts: Speed

INT = Quality of

Service

Population

HC = Quantity of Service

Remarks

C = Lift Capacity (No. of Passangers)

Total Number of Stops

N = Number of Floors above Main Terminal

Floors

H = Average highest reversal floor *

L = Number of Lifts

D = Total Travel Distance in Meters above

Main Terminal Floors

A = Average inter floor Distance = D/(N-1)

B = Lift Speed in mps (NBC Recommended 0.6 -

1.0 m/s up to 6 Floors, 1.0 -1.5 m/s for 7 -15

Floors, 1.5 -1.75 m/s for 16 -20 Floors, 1.75 -2.5

m/s for 21 -30 Floors, 3.0 -4.0 m/s for 31 -45

Floors, 4.0 -6.0 m/s for 46 -60 Floors, 6.0 m/s

and above for Above 60 Floors)**

S = Average Number of Stops = N[1-(1-1/N) p]

tv = Single floor transit time = average inter

floor distance/rated speed =A/B

tp = Passenger Transfer Time =2s

tc = Door Close = 3s

to = Door Open = 3s

T = door operating time (tc+to) + single floor

flight time tv

RTT =The Up Peak Round Trip Time in Seconds

RTT = 2Htv + (S + 1)(T - tv) + 2Ptp

INT = Average Time Intervel in Seconds, INT =

RTT/L (r/f) For Office Buildings <25s Excellent,

25<30s Very Good, 30<35s Good, 35<40s Fair,

40<45s Poor, >45 Unsatisfactory

Average Waiting Time in Seconds (r x .8) For

Office Buildings <25s Premium, 25 to 35s

Regular

P = Average Number of Passengers carried in a

Car (0.8 x C)

Tp = Total Population (100%)

Total population to be handled during peak

morning period (0.75 x 0.8 x Tp)

HC = 5 min Lift Handling Capacity in

Percentage HC

=((300xPxLx(100/Population))/RTT) or

((300xPx(100/Population))/INT)

Recommended Handling Capacity for

Residential Buildings % = H (HIG > 8%, MIG 6 to

8%, LIG 5 to 7%), For Office Buildings 10 to 15%

for Multi Tenancy and 15 to 25% for Single

Tenancy

Nominal Travel Time (Distance/

Speed (D/B)) (NBC

Recommended NTT for Office,

Commercial or Hotel Buildings (1)

15 to 25s Excellent (2) >25 to 35s

For more details and for Special/ Specific Buildings, refer the abstracts of NBC 2016 attached here with

1) Minimum one stretcher lift shall be provided in each building having height more than 30 m so as

to take care of medical as well as other emergencies. This lift shall have minimum car entrance width

of 800 mm and car depth of 2100 mm may be considered in residential/commercial buildings.

(clause 8.4.6)

2) There shall be at least one fireman's lift per building. Buildings of Height 21 m and Above and below 60 m

The fireman's lift shall have a floor area of minimum 1.43 m2. It shall have loading capacity of not less than

3) Buildings of Height 60 m and Above The fireman's lift shall have loading capacity of not less than

1000 kg and floor area not less than 2.35 m2. (clause 7.1.2)

a) Considering buildings with average floor height of 3.0 m.

b) For any other building, the speed of the lifts will have to be validated against the total population and

184

For certain specialized building functions such as BPO, areas ranging from 6m2 to 10m2 per person may be

considered.

2. Quantity of Service

It is measured in terms of the total number of passengers handled during the peak 5 min period of the day.

The minimum recommended quantity of service is given in Table 2.

Table 2 Recommended Quantity of Service in Office

Buildings

Sl No.

Type of Occupancy

Quantity of

service percent

i

Multi Tenancy

10 to 15

ii

Single Tenancy

15 to 25

Fee

3. Quality of Service

The interval or the average time between successive arrivals of the lift cars at the main lobby is generally

considered as an indicator of passenger waiting time.

Table 3 gives the quality of service based on interval.

Table 3 Recommended Quality of Service in Office

Buildings (Based on Interval)

Sl No.

Quality of Service

Interval

s

i

Excellent

Less than 25

ii

Very Good

25 to less than 30

iii

Good

30 to less than 35

iv

Fair

35 to less than 40

v

Poor

40 to less than 45

vi

Unsatisfactory

45 and above

Table 4 gives the quality of service measured as average waiting time.

Table 4 Recommended Quality of service in Office

Buildings (Based on Average Waiting Time)

Sl No.

Class of Building

Average Waiting

Time s

i

Premium

<25

ii

Regular

25 to 35

4. Traffic Analysis Equation

185

The classical method to size a lift installation requires the determination of the time, in second, that it takes

for a single lift to make a round trip around the building during the up-peak traffic condition. This is called

the round trip time and is given by:

RTT = 2Htv + (S+I)(T-tv) + 2 Ptp

where,

N = Number of floors above main terminal floors,

H = Average highest reversal floor

S = Average No of stops

N-[1-(1-1/N)P]

P = Average passengers carried

= 0.8 * maximum actual car capacity,

tv = single floor transit time=average inter floor distance/rated speed,

T = door operating time (tc+ to) + single floor flight time tf(1),and

tp = Passenger transfer time.

The derivation of the round trip time equation assumes the following:

a)

Traffic pattern corresponds to pure up-peak.

b)

Passengers arrive according to a rectangular probability distribution.

c)

Lifts, on an average, fill to 80 percent of the actual car capacity by numbers irrespective of the

weight of each passenger or the space that maybe occupied

d)

All floors are equally populated

e)

Rated speed is achieved In a single floor jump,

f)

Inter floor heights are equal

g)

Door dwell time does not exceed the calculated passenger transfer time.

Interval, INT = RTT/L, where L is the number of lifts in a single group.

5 min handling capacity, HC=

300*P*L*100/Population

RTT

or

300*P*100/Population

INT

The down peak round trip time is estimated as:

RTT down peak = Ntv + (0.5S+1)(T - tv) + 2Ptp

The mid-day round trip time is estimated as:

RTT mid-day =

2Htv + 2S(T - tv) + 4Ptp

An estimation of interfoor performance can be obtained using:

AWT interfloor = INT uppeak + [o.22+1.78* A interfloor/HC uppeak]

Where A interfloor is the number of passengers arriving during the interfloor period.

Configuration of Lifts: Number

Determination of number of lifts depends on the required quality and quantity of service. It should be noted

here that grouping of lifts and location should be given adequate attention.

Configuration of Lifts: Capacity

Determination of car capacity depends on the required quality and quantity of service. A larger car, while

improving the handling capacity might adversely impact the quality of service.

Configuration of lifts: Speed

186

In addition to the speeds derived from the calculations for handling capacity and interval, the nominal travel

time is used for selecting suitable rated speeds. The higher the building, the faster lifts are needed. The

recommended values for nominal travel time in case of an office, commercial or hotel building are given in

Table 5.

Table 5 Recommended Nominal Travel Time for Office,

Commercial or Hotel Buildings

Sl No.

Level

Nominal Travel Time

s

i

Excellent

15 to 25

ii

Good

> 25 to 35

iii

Satisfactory

> 35 to 45

Configuration of lifts: Layout

The width of the lift well entrance is the basis element in the determination of the best proportions.In other

words, the width of the car is determined by the width of the entrance and the depth of the car is regulated

by the loading per square metre permissible under this standard.

Centre opening doors are the most practicable and the most efficient entrance units for passenger lifts.Given

the same door speed,the centre opening is much faster than the side opening type> For passenger lifts,wider

cars are preferred as the ingress and egress efficiency is higher. For service/ freight/ stretcher lifts deeper

cars are preferred, so as to easily carry the stretcher/goods.

Planning for Specific Building Features

Special Building Facilities

Facilities like cafeteria, food courts, restaurants, gymnasia, etc., in the building impact the circulation

patterns in a building and should be considered for lift traffic design

Basement Service

Buildings are sometimes designed with car parks or other facilities at basement levels below the terminal

floor. Such floors, if they are served by the main lifts have an adverse impact on the up-peak, down-peak and

mid-day traffic patterns.

It is therefore better to provide basement service to the main lobby by a separate group of 'shuttle' lifts so as

to avoid compromising the traffic handling capability of the main group.

Multiple Entry Levels

Some buildings have main entry points at more than one level. The effect of more than one main terminal is

disruptive and adversely impacts effective circulation and movement. If there are more than one entrance

levels, means should be provided to bring all the routes to a single terminal floor.

If this is not possible, then the lift system planning should take into account the extra times incurred

stopping and loading at multiple entry floors. Another difficulty is in deciding whether the building

population will use each entrance equally. In the absence of any guidance, the solution is to assume an

entrance bias with an additional 10 percent and size the lifts to meet the additional required handling

capacity.

The loss of lift efficiency because of multiple entry levels could be as 15 percent per additional entry level.

Both basement service and multiple entry level buildings with lifts serving all floors also can impact the

security of the building.

Non-Smoking Buildings

187

When buildings are defined as non-smoking buildings, designers need to factor in the additional load put on

the lifts on account of additional trips that smokers make to go outside the building.It is appropriate to

provide pressurized smoking zones at the floor level rather than require smokers to make additional trips.

Reserved lifts

When lifts have to be reserved for VIP personal movement, designers should not consider these lifts as part

of the lift group.

Zoning (Vertical)/Sky Lobbies in Very Tall Buildings

As the number of floors served increases, the value of H and S also increase, adversely impacting the round

trip time and performance of the lift system. This has led to the concept of zoning in tall buildings. In stacked

zoning, a tall building is effectively divided into horizontal layers or stacks. RTT, quality and quantity of

service can be arrived at separately for each zone. The desired level of service can be attained by adjusting

two parameters in this case- the number of lifts and the number of floors in the zone. The round trip time for

each zone is given by:

RTT = 2Htv + (S + 1) (T-tv) + 2Ptp + 2[texpress - tt(1)]

Where texpress is the flight time from the main terminal to the express zone terminal/Sky lobby.

The round trip time for shuttle lifts serving only 2 floors-main terminal and sky lobby is given by:

RTT = 2T + 2Ptp

Planning For Specific Building Types

Residential Buildings

The peak traffic condition occurs during the morning down peak when many adults and children are leaving

for work and school at the same time. Population assumptions would also need to consider the service staff,

drivers of cars, etc. For high rise buildings the delivery of newspapers and milk and disposal of garbage are

also required to be considered.

In the luxury housing segment, where the number of ratio of service staff to residents is fairly high, separate

service lifts may be required for door deliveries and service staff. Typical average daily population for a

residential building is given in Table 6.

The passenger handling capacity shall be as given in Table 7. The intervals shall be as per values in Table 8.

Table 9 gives the recommended quality of service measured as average waiting time for residential buildings

and Table 10 gives the nominal travel times.

Sizing of lifts should consider the requirement to shift the

stretchers, heavy material, etc and it is recommended that at least one lift in each building should be a deep

car which can accommodate a regular ambulance stretcher.

Table 6 Typical Average Population for Residential Buildings

Sl

No.

Type of Apartment

Number of Bedrooms Per Apartment

1

2

3

3 With Servent

Quarters

4 With or

Without

Servent

Quarters

i)

High End Apartments

a)

Residents

2 to

3

3 to

4

5

5

5 to 6

b)

Resident Service Staff

0

0

0

1

1

c)

Floating Service Staff

1

2 to

3

3 to

4

3 to 4

4 to 5

ii)

Mid End Building

a)

Residents

3

4

5

5

5 to 6

b)

Resident Service Staff

0

0

0

1

1

c)

Floating Service Staff

1

1

2 to

3

2 to 3

3 to 4

iii)

Low End Building

a)

Residents

4 to

5

5 to

6

NA

NA

NA

b)

Floating Service Staff

0.5

0.5

NA

NA

NA

188

NOTE -- Unless separate lifts are provided for service staff, due consideration for service staff shall be

given while calculating the required number of lifts.

Table 7 Recommended Handling Capacity for Residential

Buildings

Sl No.

Class of Building

Handling Capacity

Percent

i

High end Building

> 8

ii

Mid end Building

6 to 8

iii

Low end Building

5 to 7

Table 8 Recommended Quality of Service for Residential

Buildings (Based on Time Interval)

Sl No.

Class of Building

Interval

s

i

High end Building

≤ 60

ii

Mid end Building

61 to 80

iii

Low end Building

81 to 100

Table 9 Recommended Quality of Service in Residential

Buildings (Based on Average Waiting Time)

Sl No.

Level

Average Waiting

Time s

i

High end Building

≤ 30

ii

Mid end Building

31 to 45

iii

Low end Building

46 to 60

Table 10 Recommended Nominal Travel Time for

Residential Buildings

Sl No.

Level

Nominal Travel Time

s

i

High end Building

25 to 35

ii

Mid end Building

36 to 45

iii

Low end Building

46 to 60

Note - In case of super high rise buildings considering limit of

speed as 10 m/s, the travel time may be longer than specified

above.

Hospitals

Factors to be considered include number of staff and shift patterns, number of visitors and visiting hours,

location of operation theatres, facilities, delivery of housekeeping supplies, waste disposal, evacuation

189

procedures and segregation of sterile areas. When carrying out traffic analysis for hospitals, designers

should consider establishing average car loading by volume rather than by weight. Arrival rates may

approximate 10 percent to 15 percent and interval may be 30 s to 50 s.

The sizing of the lift car and doors should be such that a standard hospital stretcher and attendant can be

easily accommodated. Where the hospital bed is likely to be moved the lift car should be able to

accommodate the standard hospital bed including the auxiliary support equipment like oxygen cylinders,

etc.

In large hospitals it is recommended that the lifts for the patients/hospital beds (or stretchers) should be

separated from the lifts for staff/visitors.

NOTE - For hospital buildings, designers should also consider that in an emergency a number of patients

would require to be evacuated on stretchers

Hotels

The most demanding time is during the check in and check out period and two way traffic occurs during

this period with guests going to and from rooms and restaurants and in and out of the hotel. Calculations

should be made assuming an equal number of up and down stops during this period. Average room

occupancy may range from 1.5 to 2 persons and arrival rates from 10 to 15 percent .Security

considerations need to be taken into account whilst establishing the circulation and lift requirements.

Escalators such as from the lobby to banquet/function level. Adequate number of service lifts need to be

provided for service movement of housekeeping and room service staff as well as movement of material.

Retail - Malls with Multiplexes

Pedestrian movement in retail establishment like malls is generally centered on escalators, and lifts do not

play a major part. However, provision should be made for movement of shopping trolleys, wheel chairs,

perambulators and persons with limited mobility from one level to another. A commonly applied solution is

the installation of inclined moving walks. Where lifts are provided, assumptions of lift car sizing should take

into account space occupied by trolleys and shopping bags. Where multiplexes are located on the upper

floors, the last movie of the day gets over after the mall is closed at which time the escalators might not be

available. In such cases the lift provision has to be adequate to handle the egress of the total multiplex

population.

Airports/Railway Stations

While moving walks and escalators greatly improve the building circulation, the use of lifts has to be

considered for persons with limited mobility and for movement of baggage trolleys from one level to another.

The RTT equation of 4.2.5 may be used, but car occupancy levels taking into account space occupied by

trolleys.

Multi-Level Car Parking

Multi-level car parks may be standalone public car parks or attached to office, retail or residential

complexes. These car parks may be fully automated where drivers would leave the cars inside or on a

trolley at the entry floor and the car is parked and retrieved automatically. The other alternative would be

for the use of car lifts and/or ramps.

When the movement of the cars is dependent on car lifts, detailed study has to be carried out to

establish the required number of car lifts ensuring that average car retrieval / parking time does not

exceed 2 min.The sizing of the car lifts has to be adequate to fit the largest vehicle that is intended to be

transported as well as adequate space to enable evacuation of passengers in the eventuality of an

entrapment. Designers will also need to take into account the probability of queues developing and provide

for holding lanes.

Multi - Level Car Parking Passenger Traffic

When car lifts or ramps are the means for parking the cars, then means would ned to be provided for the

movement of passengers from and to the parking floors. If the main building lifts also serve the parking

floors, it is to be noted that, performance will be adversely impacted due to multiple entry floors. Additional

entry floors will also affect the security of the building. It is therefore recommended that separate lifts

should be considered to move passengers. If separate parking lifts are provided, the basic RTT equation of

4.2.5 may be used. Average vehicle occupancy may be considered as 1.5 per car for office car parks, 4 for

airports and retail and 2 elsewhere.

Schools and Other Educational Institutions

In schools and other educational institutions, the traffic flow would consist of peak demand for short

duration that would exist just before the start or after finishing of a class or lecture.It is unlikely that an

economical solution can be implemented for such high peak requirements. Therefore the design of the

190

building has to be such that heavy stair usage is facilitated.

Buildings with 24 x 7 Operations

In buildings operating 24 x 7 (round the clock), the peak traffic conditions would not be a typical up peak

but will occur during shift changes. The handling capacity should take into account the incoming as well as

outgoing traffic. Calculation shall be made assuming both up and down stops during this period. Particular

attention should be paid while designating the drop off points, these should be assigned to a level so as to

not increase that the lifts in such buildings would have a significantly higher number of starts/stops per

hour than a conventional building.

Observatory

The height at which the observatory is located and the number of people expected at the

observatory level shall decide the speed and the number of lifts. The circulation logic is crucial in locating

the observatory lifts. Also, if the observatory is connected with lounge/cafe/souvenir shops, etc, separate

service lifts may need to be provided.

Other Considerations

Designers need to be aware that the door opening and closing times, acceleration and deceleration times,

etc., would vary between the suppliers and equipment types and can impact the overall lift performance.

The dispatch algorithms and controller responses would also vary between the supplier and the equipment

types and can impact the actual operational results.

Lifts will breakdown as well require to be shut down for regular maintenance and repairs. Lift availability

might be hampered during renovation of the building as a lift might be taken up for movement of material

and debris. Designers should take into consideration the impact of such non-availability of lifts. The

provision of well -located and easily accessible stairs can considerably lessen the demands on the lifts and

therefore architect/engineer should consider this aspect in the layout.

Lift Speed

For passenger lifts in a building, the general recommendations as given in Table 11 may be followed.

Quiet Operation of Lifts

Every precaution should be taken with passenger lifts to ensure quiet operation of the lift doors and

machinery. The insulating of the lift machine and any motor generator from the floor by rubber cushions,

prevents transmission of most of the noise.

Table 11 Lift Speed

Sl No.

No. of Floors

Speed m/s

i

Up to 6

0.6 to 1.0

ii

7 to 15

1.0 to 1.5

iii

16 to 20

1.5 to 1.75

iv

21 to 30

1.75 to 2.5

v

31 to 45

3.0 to 4.0

vi

46 to 60

4.0 to 6.0

vii

Above 60

6.0 and above

NOTES

1) Above table is considering buildings with average floor height of 3.0

m.

2) For office buildings average floor height is 4.2 m (see table 5 and Table

10).

3) Finalizing the lift speed for any building depends on detailed traffic

analysis because number of floors, area per floor, area per person and

class of building are crucial factors, which serve as inputs for such

traffic analysis.

4) Finalizing the speed for hotel depends on the number of keys per floor

and similarly for an observatory depends on the number of expected

footfall.

191

5) For any building, the speed of the lifts will have to be validated against

the total population and travel height of the building.

STANDARD REQUIREMENTS FOR LIFTS (Refer: Part 8, Section 5A of NBC 2016)

Minimum floor to floor height for landings on same side for horizontally sliding door is f+750 mm, where 'f'

is clear entrance height, in mm. (clause 5.10.3.2)

Civil Requirements: Requirements of Lift Well Enclosure -- Requirements of the Pit -- Requirements

Associated with Machine Room and Pully Room -- (Refer: clause 6.1)

Electical Installation Requirements: Main Swtches -- Residual Current Device -- Supply Cables Wiring and

Apparatus --Earthing (Refer: clause 6.2)

FIRE PROTECTION REQUIREMENTS FOR LIFTS: Fire Protection Requirements of Lifts in High Rise

Buildings -- Evacuation Lifts (Refer: clause 7)

MINIMUM TECHNICAL AND SAFETY REQUIREMENTS: General Requirements -- Power and Control

Systems -- Capacity and Loading -- Other Technical and Safety Requirements -- Painting at works and on

Site -- Emergency Manual Rescue (Refer: clause 8)

Emergency Lights for Critical Areas Battery powered (at least 2 h rating) emergency lights should be installed

at critical and strategic locations including emergency exit points. These will provide illumination by self-

contained battery source even on failure of a.c. mains. On resumption of a.c. power supply, they will switch

back to mains automatically and simultaneous recharge the battery to the required level.

For office buildings, it is desirable to have at least a battery of 2 lifts at two or more convenient points. If this

is not possible, it is advisable to have at least two lifts side by side at the main entrance and one lift each at

different sections of the building for inter-communication. When two lifts are installed side by side, the

machine room shall be suitably planned. All machines and switchgear may be housed in one machine room.

192

Minimum-Maximum Net Car Areas for Various Rated Loads (Table 24 -Clause 8.3)

Minimum net car inside area for fireman lift is 1.43 m2.

193

RECOMMENDED DIMENSIONS OF PASSANGER LIFTS & SERVICE LIFTS

(Ref: PART 8, Section 5A, Table 12, Clause 5.10.3.1 of NBC 2016)

194

TABLE - 1

(All dimensions are in millimeters)

Notes:

1. All dimensions given above for lifts having centre opening power operated doors (COPD) with

counterweight at rear, are recommended dimensions primarily for architects and building planners.

Any variations mutually agreed between the manufacturer & the purchaser are permitted. However,

variation in,

a)

Car inside dimensions shall be within the minimum and maximum area limits specified in

accordance with accepted standards.

b)

Entrance width on higher side is permitted.

c)

Entrance width on lower side is permitted up to 100 mm subject to minimum of 700 mm

2. The minimum size of the lift car and all other requirements relating to accessibility, in all public

buildings shall be in accordance with 13 of Part 3 ‘Development Control Rules and General

Building requirements’ of the code.

TABLE – 2

Recommended Dimensions of Stretcher / Hospital Lifts

(Ref: PART 8, Section 5A, Table 13, Clause 5.10.3.1 of NBC 2016)

(All dimensions are in millimeters)

195

Notes:

1. All dimensions given above for lifts having Two panel telescopic doors (2P TSPD) with counterweight

at side, are recommended dimensions primarily for architects and building planners. Any variations

mutually agreed between the manufacturer & the purchaser are permitted. However, variation in:

a)

Car inside dimensions shall be within the maximum area limits specified in accordance with

accepted standards.

b)

Entrance width on higher side is permitted.

c)

Entrance width on lower side is permitted up to 100 mm subject to minimum of 700 mm.

2. Car depth of 2100 mm may be considered in residential/commercial buildings, where use of only

ambulance stretcher is envisaged. The hoist-way depth may be reduced accordingly.

TABLE – 3

Recommended Dimensions of Goods Lifts with Machine Room

(Ref: PART 8, Section 5A, Table 14, Clause 5.10.3.1 of NBC 2016)

(All dimensions are in millimeters)

Notes:

All dimensions given above for lifts having Centre Opening power operated doors (COPD) with

counterweight at side, are recommended dimensions primarily for architects and building planners.

Any variations mutually agreed between the manufacturer & the purchaser are permitted. However

the minimum rated load for the goods lift shall be based on a load of not less than 3.45 kN/m² of

the net inside car area.

196

TABLE – 4

Recommended Dimensions of Machine Room Height, Overhead, Pit depth for Passenger, Goods,

Stretcher/Hospital Lifts with Machine Room

(Ref: PART 8, Section 5A, Table 15, Clause 5.10.3.1 of NBC 2016)

(For speed up to 3.5 m/s)

(All dimensions are in millimeters)

(For speed from 4.0 m/s to 10.0 m/s)

197

(All dimensions are in millimeters)

CH – Car clear inside height measured from Car finished floor level to false ceiling.

Notes:

1. Recommended dimensions for pit depth, overhead and Machine-Room for different lift speeds

are given in the table above. These dimensions may differ in practice as per individual

manufacturer’s design depending upon load, speed and drive. However, the Pit Depth and

Overhead shall be such as to conform to the requirements of bottom clearance and top

clearance in accordance with the accepted standards.

2. In case of Goods lifts of minimum pit depth required is 1600 mm.

3. In case of lift speeds 3.5 m/s and 4.0 m/s with rear counterweight the Pit Depth requirement

could be less by about 500 mm to 1000 mm.

TABLE – 5

Recommended dimensions of Automobile Lifts with Machine Room – Through Type Car (Rated Speed = 0.6

m/s or 1.0 m/s)

(Ref: PART 8, Section 5A, Table 16, Clause 5.10.3.1 of NBC 2016)

(All dimensions are in millimeters)

Notes:

1. All dimensions given above for lifts having centre opening power operated doors (COPD) with

counterweight at side, are recommended dimensions primarily for architects and building

planners. Any variations mutually agreed to between the manufacturer and the purchaser are

permitted. However, the minimum rated load for the automobile lift shall be based on a load of

not less than 1.45 kN/m² of the net inside car area.

198

2. Dimensions of machine room height, pit depth and overload may differ in practice as per

individual manufacturer’s design depending upon load, speed and drive. However, the pit depth

and overhead shall be such as to conform to the requirement of bottom clearance and top

clearance in accordance with the accepted standards.

3. The lift car width should be selected such that in case of emergency while the automobile is in

the car-lift the driver should be able to open the automobile door and come out of the

automobile.

Recommended dimensions of Dumbwaiter Lifts

(Ref: PART 8, Section 5A, Table 17, Clause 5.10.3.1 of NBC 2016)

(All dimensions are in millimeters)

Notes:

Entrance width ‘E’ is based on assumption of provision of vertical biparting doors (No car door is normally

provided)

TABLE – 7

Recommended dimensions of Passenger Lifts MRL COPD

(Ref: PART 8, Section 5A, Table 18, Clause 5.10.3.1 of NBC 2016)

(All dimensions are in millimeters)

Notes:

1)

All dimensions given above for lifts having center opening power operated doors (COPD) with

counterweight at side, are recommended dimensions primarily for architects and building planners.

Any variations mutually agreed to between the manufacturer and the purchaser are permitted.

However, variation in,

a) Car inside dimensions shall be within the maximum area limits specified in accordance with

accepted standards.

b) Entrance width on higher side is permitted.

c) Entrance width on lower side is permitted up to 100 mm subject to minimum of 700 mm.

199

2)

The minimum size of the lift car and all other requirement relating to accessibility, in all public

buildings shall be in accordance with 13 of part 3 ‘Development Control Rules and General

Building Requirements’ of the Code.

TABLE – 8

Recommended dimensions of Stretcher/Hospital Lifts MRL (2P Telescopic Door/4P COPD, Speed

1.0 m/s to 2.0 m/s)

(Ref: PART 8, Section 5A, Table 19, Clause 5.10.3.1 of NBC 2016)

Notes:

1)

All dimensions given above for lifts having 2 panel telescopic or 4 panel center opening power

operated doors (4P COPD) with counterweight at side, are recommended dimensions primarily for

architects and building planners. Any variations mutually agreed to between the manufacturer and

the purchaser are permitted. However, variation in,

i) Car inside dimensions shall be within the maximum area limits specified in accordance with

accepted standards.

ii) Entrance width on higher side is permitted.

iii) Entrance width on lower side is permitted up to 100 mm subject to minimum of 700 mm.

2)

Car depth of 2100 mm may be considered in residential/commercial buildings where use of only

ambulance stretcher is envisaged. The hoist-way depth maybe reduced accordingly.

TABLE – 9

Pit Depth for Passenger/Stretcher/Hospital Lifts MRL

(Ref: PART 8, Section 5A, Table 20, Clause 5.10.3.1 of NBC 2016)

(All dimensions are in millimeters)

Notes:

Recommended dimensions for pit depth for different lift speeds are given in the table. These

dimensions may differ in practice as per individual manufacturers design depending upon load,

200

speed and drive. However, the pit depth shall be such as to conform to the requirements of bottom

clearance and top clearance in accordance with the accepted standards.

TABLE – 10

Overhead Height for Passenger and Stretcher/Hospital Lifts MRL

(Ref: PART 8, Section 5A, Table 21, Clause 5.10.3.1 of NBC 2016)

(All dimensions are in millimeters)

Notes:

Recommended dimensions for overhead for different lift speeds are given in the table. These

dimensions may differ in practice as per individual manufacturers design depending upon load,

speed and drive. However, the overhead shall be such as to conform to the requirements of bottom

clearance and top clearance in accordance with the accepted standards.

TABLE – 11

Recommended dimensions of Goods Lifts MRL (Speed 1.0 m/s)

(Ref: PART 8, Section 5A, Table 22, Clause 5.10.3.1 of NBC 2016)

Notes:

1)

CH is the clear car height from car finished floor level to car roof (goods lifts will normally not have

any false ceilings)

2)

Normal range for CH is 2100 mm to 2400 mm.

3)

Door height is less than or equal to the car height CH.

4)

In case counterweight safety is applicable check for dimensions with lift manufacturer.

201

5)

All dimensions given above for lifts having telescopic or centre opening power operated doors

(COPD) with counterweight at side, are recommended dimensions primarily for architects and

building planners. Any variations mutually agreed to between the manufacturer and the purchaser

are permitted. However, the minimum rated load for the goods lift shall be based on a load of not

less than 3.45 kN/m² of the net inside car area.

6)

Recommended dimensions for overhead and pit depth for different lift speeds are given in the table.

These dimensions may differ in practice as per individual manufacturers design depending upon

load, speed and drive. However, the overhead and pit depth shall be such as to conform the

requirements of bottom clearance and top clearance in accordance with the accepted standards.

TABLE – 12

Recommended Dimensions of Automobile Lifts MRL COPD (Speed 0.5 m/s to 1.0 m/s)

(Ref: PART 8, Section 5A, Table 23, Clause 5.10.3.1 of NBC 2016)

(All dimensions are in millimeters)

Notes:

1)

Car height normal range is 2100 mm to 2700 mm.

2)

Overhead height shown is required for all values of car height CH shown above.

3)

In case counterweight safety is applicable check for dimensions with lift manufacturer.

4)

All dimensions given above for machine room less lifts with 6 panel center opening power doors

(6P COPD) used for automobiles are recommended dimensions for architects and building

planners. Any variations mutually agreed to between the manufacturer and the purchaser are

permitted. However, the minimum rated load for the automobile lift shall be based on a load of

not less than 1.45kN/m² of the net inside car area.

5)

Dimensions of pit depth and overhead may differ in practice as per individual manufacturers

design depending upon load, speed and drive. However, the pit depth and overhead shall be

such as to conform to the requirements of bottom clearance and top clearance in accordance

with the accepted standards.

6)

The lift car width should be selected such that in case of emergency while the automobile is in

the lift car the driver should be able to open the automobile door and come out of the

automobile.

202

B.

REQUIREMENT FOR ELECTRICAL SUB STATION (see clause 5.3.1.3)

Spaces for Electrical Installations

The spaces required for different electrical installations are given at 3.1 to 3.3

Electric Sub-station – The norms given in 3.1.1 and 3.1.2 shall be adopted for provision of space for

sub-station.

AREA REQUIRED FOR TRANSFORMER ROOM AND SUBSTATION FOR DIFFERENT CAPACITIES

C-1 The requirement for area for transformer room and substation for different capacities of transformers is

given below for guidance:

Capacity of

Transformer

( kVA )

Total

Transformer

Room Area,

Min

Total Substation

Area (Incoming,

HV Panels, MV

Panels, Transformer

Roof but Without

Generators), Min

Suggested

Minimum Face

Width

1 × 160

14.0

90

9.0

2 × 160

28.0

118

13.5

1 × 250

15.0

91

9.0

2 × 250

30.0

121

13.5

1 × 400

16.5

93

9.0

2 × 400

33.0

125

13.5

3 × 400

49.5

167

18.0

2 × 500

36.0

130

14.5

3 × 500

54.0

172

19.0

2 × 630

36.0

132

14.5

3 × 630

54.0

176

19.0

2 × 800

39.0

135

14.5

3 × 800

58.0

181

14.0

2 × 1000

39.0

149

14.5

3 × 1000

58.0

197

19.0

203

NOTES:

1 The areas given in respect of the different categories of rooms hold good, if they are provided with

independent access doors in accordance with local regulations.

2 The minimum height of substation room/HV switch room/MV switch room shall be arrived at considering

1 200 mm clearance requirement from top of the equipment to the below of the soffit of the beam. In case

cable entry/exit is from above the equipment (transformer, HV switchgear, MV switchgear), height of

substation room/HV switch room/MV switch room shall also take into account requirement of space for

turning radius of cable above the equipment height

3 Additional space will be required in cases where the load requirement calls for redundancy for enhanced

reliability through addition of switchgear, such as, bus couplers, etc.

4 For transformers of other capacity, it may lead to some minor changes in dimensioning.

The break-up spaces required for different installations in a sub-station are given as below:

1. Supply company’s Switchgear room and or space of meters.

2. Transformer Rooms: The number and size of transformer rooms shall be ascertained from the

total power requirements of the company. To determine the size of transformer and clearance

around a transformer, reference may be made to good practice (I.S.1887-1967 code of

practice

for installation and maintenance of Transformer). A 500 KVA transformer may be provided with a

minimum space of 4 m. X 4 m.

If transformer is to be installed outdoor space shall be provided on similar considerations and

adequate provision for safety enclosure is to be made. For transformer having large oil content (more

than 2000 lt.) soak pits are to be provided in accordance with rule 64 of Indian Electricity Rules,

1956.

3. High Voltage Switch Rooms: In case of sub-station having one transformer, the owner is required to

provide only one high voltage switch. In the case of single point supply for two

transformers, the

number of switches required is 3 and for ‘n’ transformers the number of switches is n+1. The floor

area required in case of a single switch will be roughly 4mX1m and for every additional switch the

length should be increased by 1m.

4. Low Voltage Switch Rooms: The floor area requirement in respect of low voltage switchgear room

cannot be determined by any formula.

5. Room for Stand-by-Generator: A room space not less than 6 m. X 9 m. may be provided for housing a

standby Generator set of 50 KW.

Location of electric sub-station in basement of multi-storeyed buildings:

1

The electric sub-station should be provided in the approved/sanctioned covered area of the

buildings not below the first basement level and should be on the periphery of the building

with clear independent round the clock approach having proper ramp with slope.

The ramp should be designed in such a manner that in case of fire no smoke should enter

the main buildings. The exit from basement electric sub-station shall have self-closing

fire/smoke check doors of 2 hours. F.R. near entry to ramp. Additional exit shall be provided

if travelled distance from the farthest corner of the ramp is more than 15m.

2

The electric sub-station should be totally segregated from rest of the basement having 4

hours. F.R. wall and should have adequate internal lighting and ventilation. A perfect

independent ventilation system of 30 air charges per hour linked with detection as well as

automatic medium velocity water spray system for individual transformer shall be located

outside the building at ground floor, fire control room shall be manned round the clock

and shall also have and audio system in the

basement as well as in the control room. No

204

service such as water, sewer, air-conditioning, gas pipes or telegraphs services should pass

through electric substation of the cable trench.

3.

The rising mains should be of metal bus bars. The floor of electric substation should be 2

ft above the rest of basement floor and designed suitably to carry 10 tons of transformer

weight on wheels also having provision of proper cable trenches 0.6 X 0.6 m. depth. Dummy

floor of 0.6 m. depth be provided to facilitate laying of cables inside the building connecting

to equipment. Fire retarding cables should be provided and cable trenches be filed with said

cables. R.C.C. pipes at suitably places as required will be provided for cable entries to the

sub-station spaces with suitable water proofing arrangement. A provision of 12 ft. clear

height below Beams should be made in the electric sub-station area along with adequate

arrangement for fixing chain pulley block for a load of 15 tons. Provision of sumps shall be

kept in the floor so that complete volume of transformer oil in the event of spill over could

be accommodated. Sufficient arrangement to prevent spread of fire to oil pumps is made.

4.

Transformers room and sub-station room shall be provided with steel shutters of 8’ X 8’

with suitable grills. Sufficient arrangement for pumping the water out, in case

of

flooding should be made to minimize loss to switchgear and transformer.

5.

In view of experience of installation of exhaust chimneys in the multi-storeyed buildings at

undesirable locations, proper provision in the form of vertical exhaust leading to above

terrace level should be made for the substation.

6.

Electric sub-station space should be made available free of cost by promoters and should

be free of seepage/leakage of water. There should be no combustible material kept in side

or in the vicinity. Periodic inspection of electric sub-station shall be mandatory and violation

of any byelaw will be dealt, sternly with penalty and immediate disconnection.

Ideal Location

(i) The ideal location for an electric sub-station for a building or group of buildings would be at

the load center and shall be located on the ground floor in a separate building. Such

building should have direct access through a motorable road to ensure easy access or

removal of equipment. The floor level of the sub-station or switch room (in case of LT) shall

be above the highest flood level of the locality.

(ii) In case the sub-station has to be located within the main building itself for unavoidable

reasons, then it should be located on ground floor with easy access from outside. Location

of sub-station in the basement floors should be avoided as far as possible on account of

likely flooding and fi re hazard. In case it is unavoidable, then fool proof anti-flooding

measures have to be taken, which includes provision of automatic dewatering pumping and

construction of waterproof basement. Such portion (for sub-station) should be isolated from

the rest of basement and should have easy entry and exit arrangement. Also, suitable

mechanical ventilation and fi re detection/ protection system to be provided to conform to

B.I.S. requirements and requirements of local fi re authority. Only dry type transformers

and switchgear to be provided, unless they are installed in a separate service building

separated from the main building.

(iii) Emergency power supply equipment (such as generating sets) shall not be allowed to be

installed above ground floor or below first basement level of building. 10

(iv) Facility for connection from sub-station to adjoining building to feed emergency load shall

be permitted.

Other Requirements for Sub-station

205

1.

The sub-station will preferably be located on the ground level failing which it can be in the

basement floor in no case at higher level.

2.

The entire space will be provided at one floor in continuation.

3.

The minimum width of the sub-station space shall not be less than 6 m.

4.

The areas given above in respect of the different categories of rooms hold good if they are provided

with windows and independent access doors.

5.

All the rooms should be provided with partition up to the Ceilings and shall have proper

ventilation. Special care should be taken to ventilate the transformer rooms and where

necessary, louvers at lower levels and exhaust fans at higher level shall be provided at

suitable locations.

6.

In order to prevent storm water entering the transformer and switch rooms through the soak

pits, the floor level of the sub-station shall be at least 15 cm above the highest flood water level

that may be anticipated in the locality.

Cable Trenches Shafts Etc.

1. Suitable number of vertical shafts, rising mains, distribution boxes, etc. shall also be provided as per

the requirements at suitable location. Cable trenches with suitable handy covers for entry of the

cables up to the substation onwards up to the street adjoining other building shall also be provided

as per the requirements.

These vertical shafts, rising mains, distribution boxes, cable trenches, etc. shall be so constructed

as to be accessible only to authorized personnel. The rising mains and other installations in the

vertical shafts, tap off boxes distribution boxes etc. required at each floor shall be provided, installed

and maintained by the owner at their own cost. Adequate enclosed space shall also be provided at

each floor for installation of equipment’s for distribution on respective floors such as distribution

boxes, cut-out, and meter boxes and main switches.

2. Location of Switch Room: In large installations other than where a substation is provided, a separate

switch room shall be provided. This shall be located as closely possible to the electrical load centre

and suitable ducts shall be laid with minimum number of bends form the point of entry of the supply

to the position of the main switchgear. The switch room shall also be placed in such a position that

rising ducts may readily be provided there from to the upper floors of the building in one straight

vertical run. In larger building, more than one rising duct and horizontal ducts may also be required

for running cables from the switch room to the foot of each rising main. Such cable ducts shall be

reserved for the electrical services only, which may, however, include medium and low voltage

installations, such as call bell systems. Telephone installation should be suitably segregated. Power

distribution shall start with suitable number of rising mains (or rising cables) for vertical distribution.

A large building will be divided into suitable number of parts, each part served by a rising main.

Suitable provision shall be kept for laying cables/ bus duct from switch room to feed each rising

main.

3. Location and Requirement of Distribution Panels: The electrical gear distribution panels and other

apparatus, which are required on such floor, may conveniently be mounted adjacent to the rising

mains, and adequate space should be provided at each floor for this purpose.

LT Distribution Switchgear Only following type switchboards will be used: (a) Main/Submain

switchboard of cubicle type. (b) DBs – Conventional DBs of reputed makes can also be used with the

approval of technical sanctioning authority in addition to prewired DB. (c) Specially designed

switchboards. Also specially designed switchboards can be used with detailed specification and

fabrication drawings approved by the technical sanctioning authority

Location of Switchboards (i) Switchboards are to be located in common areas like corridors, lobby

etc. and not to be located in locked room. (ii) Switchboard shall be located only in dry situation and

in well-ventilated space. They shall not be placed in the vicinity of storage battery or exposed to

chemical fume. 38 (iii) Switchboards shall not be erected above gas stove, or sinks or within 2.5 meter

of any washing unit in washing rooms of launderings or in the bath rooms, toilets, or kitchen. (iv) As

far as possible main boards shall not be located in basement. Such main boards can be located in

206

ground floor. (v) It is preferable to locate floor main boards in rising main shafts of adequate size,

with steel doors (having ventilation) or in suitable room. (vi) Similarly DBs can be in suitable nitches

in corridor walls having doors. (vii) Locating main boards under staircase or standing open in corridor

is not a desirable practice, besides being highly unaesthetic. (viii) The main switchboard, which

receives power to the building, should be invariably located in a switch room, having round the clock

access, for emergency attendance to the switchboard

4. Location and Requirement of PBX/PABX Room: Information regarding provision and location of

PBX/PABX room, telephone outlets and riser shall be ascertained form the relevant Authority.

Adequate space should be provided for installation of Sub-Distribution Board.

GENERAL

The maintenance of the built-up space for electric sub-station, distribution equipment, vertical shafts and

enclosure at each floor shall be done by the owner. The standby arrangement for electricity supply up to and

including the substation equipment and distribution pillars at the sub-station shall be provided compulsorily.

207

APPENDIX-XV

WATER REQUIREMENT, WASTEWATER GENERATION AND TREATMENT OF

WASTEWATER IN BUILDINGS

A. Classification of Buildings:

For the purpose of assessing the water requirement for buildings, the buildings are

classified as follows;

I. Residential

II. Non-Residential

1.

Group A: Hotels

2.

Group B: Educational

3.

Group C: Institutional / Hospital

4.

Group D: Assembly

5.

Group E: Business

6.

Group F: Mercantile

7.

Group G: Industrial

8.

Group H: Storage

9.

Group I: Hazardous

10. Traffic Terminal Stations

In case of mixed use buildings, the portion of the building proposed for each use

shall be considered for assessing the water requirement for each use, as specified

herein and the cumulative requirement shall be considered as the water

requirement for the building;

B. Components of Project to assess Water Requirement:

The following components in the Project related to water requirement, as applicable,

shall be specified for each building to assess the water requirement;

I. Source of Domestic Water Supply –

The domestic water supply for the building shall be through any of the following

systems or a combination of them;

1.

From MCC water supply system

2.

From Well / Borewell (with or without Water Treatment Plant -

WTP)

3.

From Rainwater Harvesting system (with or without WTP)

4.

From Water Tanker

This information is required to assess the overall water requirements in the city.

II. Domestic Water Distribution System –

The domestic water distribution system in the building shall be though any of the

following systems;

1. Direct supply from Centralised Water Supply System (MCC or Private),

without Over Head Tank (OHT) and Sump Tank

2. Gravity distribution System from OHT, with or without Sump Tank.

3. Pressurised distribution System through Hydro pneumatic pumping System.

208

III. Sewerage System and Reuse of Treated Water –

The Sewerage System for the building shall be any of the following systems, for

treatment of wastewater (grey or / and black water), reuse of treated wastewater

and disposal of treated and untreated wastewater.

Note:

1. Sewage – Black Water

2. Sullage – Grey Water

3. STP – ‘Sewage Treatment Plant’ usually refers to Plants designed for treating grey water and

black water together. STP may also be for treating exclusively black water.

4. SuTP – Sullage Treatment Plant refers to Plants designed for treating grey water.

5. UGD – City Level Under Ground Drainage System

Various scenarios for Wastewater Treatment & Disposal are as follows;

1.

Buildings where UGD is available –

a) Scenario 1:

i. 100% Sullage Treatment in SuTP for reuse of treated water & Excess

Treated Water to be used for Ground Water Recharge or Disposal into

Storm Water Drains as per the Water Balance Chart.

ii. 100% Sewage disposal into UGD, if permitted by MCC, as per the

Water Balance Chart.

b) Scenario 2:

iii. 100% Sullage Treatment in SuTP for reuse of treated water as per

the Water Balance Chart.

iv. Sewage treatment in STP/ETP to the extent of additional treated

water required as per the Water Balance Chart.

v. Excess sewage disposal into UGD, if permitted by MCC, as per the

Water Balance Chart.

Note: 1. This system shall be permitted where the total requirement of treated water

to be reused in the building is more than the treated water generated in SuTP and

additional treated water required is generated from STP/ETP.

2.If approval for a Project is obtained under Scenario 1, but during the course of

operation, it is observed (through the automated metering system installed in the

project) that the total requirement of treated water to be reused in the building is

more than the treated water generated in SuTP, then additional STP/ETP has to be

installed in the Project as per Scenario 2.

c) Scenario 3:

100% Sullage and Sewage treatment in STP/ETP for reuse of treated

water (for flushing and landscape / garden) and the excess treated water

to be further treated in RO Plant for domestic use.

Note: This system is optional for the owners of the building, if they intend to further treat

the excess treated water from the STP/ETP, using RO Plant to generate potable water for

domestic use.

Additional incentives shall be provided for treatment of wastewater as per Scenario 3, as

decided by MCC.

Note: In Scenario 1 & 2 above, if MCC does not permit disposal of raw sewage into UGD,

then the sewage has to be treated as specified for Scenario 3 or as specified for the

buildings where UGD is not available.

209

2.

Buildings where UGD is not available –

a) Small Buildings

i. 100% Sullage disposed into Leach Pit as per the Water

Balance

Chart.

ii. 100% Sewage disposed into Septic Tank (Sewage

generated upto

15 KLD) as per the Water Balance Chart.

b) Large Buildings

i. Scenario 1:

(a)

100% Sullage treated in SuTP for reuse of treated water & Excess

Treated Water to be used for Ground Water Recharge or

Disposal into Storm Water Drains as per the Water Balance

Chart.

(b)

100% Sewage treated in STP/ETP for reuse of treated water &

Excess Treated Water to be used for Ground Water Recharge or

Disposal into Storm Water Drains as per the Water Balance

Chart.

ii. Scenario 2:

100% Sullage and Sewage treatment in STP/ETP for reuse of treated

water (for flushing and landscape / garden) and the excess treated

water to be further treated in RO Plant for domestic use.

Note: This system is optional for the owners of the building, if they intend to further

treat the excess treated water from the STP/ETP, using RO Plant to generate potable

water for domestic use.

Additional incentives shall be provided for treatment of wastewater as per Scenario

3, as decided by MCC.

IV. Hot water system –

Hot water supply for the various uses in the building shall be through any of the

following systems.

1.

Centralised Solar Water Heating System

2.

Centralised Heat Pump System

3.

Gas Geyser for individual units

4.

Electric Geyser for individual units

V. Water Tanks –

1.

Domestic water tank –

a) Under Ground Tank (UGT) / Sump tank

b) Over Head Tank (OHT)

2.

Fire storage tank (including all types of tanks) – (For buildings above 21 m

height)

a) UGT / Sump tank

b) OHT

3.

Treated water tank –

a) UGT / Sump Tank

b) OHT

4.

Other Tanks

210

a) Hot water tank

b) RO water tank

5.

WTP Tank

VI. Centralised RO Plant

VII. Domestic Water Treatment Plant (WTP)

VIII. Gym

IX. Gym with Spa (Jacuzzi, Steam, Sauna, Ayurvedic Therapy)

X. Swimming Pool

XI. Other water bodies

XII. Landscape/Garden

XIII. Cooling Towers for HVAC & DG Set

XIV. Automated Water Meters

Automated Water Meters shall be installed as follows;

1.

Domestic Water Supply – Separate Meters to be installed as

specified

in the Water Balance Chart for Online monitoring of domestic water supplied

from the following sources.

a) City Level Water Supply Source (M1)

b) Open well / Bore well (M2)

c) Rainwater Harvesting (M3)

d) Water Tankers (M4) (in case of separate tank to Sump Tank – through

gravity or pumping)

2.

Domestic Water Distribution – The total domestic water

supplied

is

presumed to be used for the domestic purposes in the

apartments

/

premises and common areas specified herein and

shall also be used for the

shortfall in the treated water generated, if required (for the use of treated water

in the Project). Therefore,

a Separate Meter (M5) has to be installed for the

domestic water supplied towards the shortfall in treated water generated as

specified in the Water Balance Chart for Online monitoring.

3.

Treated water generated, reused and excess water disposed –

Separate

Meters to be installed as specified in the Water Balance

Chart

for

Online

211

monitoring of treated water generated, reuse of treated water and excess treated

water disposed as follows;

a) Treated water generated separately from SuTP / STP/ETP (M6)

b) Treated water reuse separately from SuTP / STP/ETP (M7)

c) Landscape Irrigation (M8)

d) Flushing (M9)

e) Excess treated water disposal separately from SuTP / STP/ETP (M10)

4.

Water Meters for individual units – Separate Meters to be installed

as

specified herein for Online monitoring of consumption of domestic water and

treated wastewater for individual units as follows;

a) Domestic water (for kitchen, dining wash basin and all toilets)

b) RO water (in case of centralised RO water supply)

c) Hot water (in case of centralised Hot water supply)

d) Treated water (in all toilets)

Note: The installation of Water Meters for individual units is not mandatory, but optional, to

claim incentives as specified herein.

XV. Any other requirements (Specific to the project, if applicable)

C. GENERAL INFORMATION OF THE PROJECT - Table-1:

(a)

Project Information

The following Project information shall be entered in Table-1;

1.

Project Name

2.

Address & Location of the Project

3.

Building category

a) Residential (Any one or more type, automatically selected from the details

entered in Table-1b, based on the various types of residential apartments

mentioned in Table-1a)

b) Non-Residential (Any one or more type, automatically selected based on

the various types of non-residential premises mentioned in Table-1c).

The following parameters have to be entered in Table-1c based

on

the

requirements of the building (of each block, in case of

multiple blocks in a

project) to derive the total water requirement

for the building (excluding water

requirement for amenities,

landscape etc.)

i.

In case of hotels, the following details have to be provided;

(a) No. of Beds

(b) No. of restaurant seats

(c) No. of Staff

ii. In case of Educational Building, the following details have to be provided;

(a) Strength of school

(b) Teaching and non-teaching staffs

iii. In case of hostels, the following details have to be provided;

(a) No. of Beds

(b) No. of Wardens’ residences

(c) No. of Staff

212

iv. In case of Hospital:

Gross Area in Sqm to be provided for;

(a) No. of beds not exceeding 100.

(b) No. of beds exceeding 100.

(c) Outpatient department (OPD)

(The water requirement includes requirement of patients,

attendants, visitors and staff. Additional water requirement for

kitchen,

laundry and clinical water shall be computed as per

actual

requirements)

v. In case of Assembly Building, the following details have to be provided;

(a) Gross Area in Sqm for Concentrated use without fixed seating

(b) Gross Area in Sqm for less concentrated use without fixed seating

(c) No. of fixed seats for fixed seating building (Cinemas, Concert halls

and Theatres and Multiplex)

(d) Gross Area in Sqm for Dining areas and restaurants with seating

and tables

(e) Gross Area in Sqm for Food Court

vi. In case of Business Building, the Gross Area in Sqm including canteen

have to be provided.

vii. In case of Mercantile Building, the following details have to be provided;

(a) Gross Area in Sqm for Street floor and sales basement

(b) Gross Area in Sqm for Upper sales floor

(c) Gross Area in Sqm for Storage/warehouse, receiving and the like.

viii. In case of Industrial Building, the following details have to be provided;

(a) Gross Area in Sqm for Factories including canteen where

bathrooms are required to be provided.

(b) Gross Area in Sqm for Factories including canteen where no

bathrooms are required to be provided.

ix. In case of Storage Building, the Gross Area in Sqm has to be provided.

x. In case of Hazardous Building, the Gross Area in Sqm has to be provided.

xi. In case of traffic terminal stations, average no. of users / day (total annual

passenger traffic / 365) plus staff plus vendors and the facility details to

be provided;

(a) Airport

(b) Railway station (Junction) with bathing facility

(c) Railway station (Junction) without bathing facility

(d) Railway station (Intermediate) with bathing facility

(e) Railway station (intermediate) without bathing facility

(f)

Interstate Bus Terminals

(g) Interstate Bus Terminals/Metro Stations

Note: 1. wherever there are multiple work shifts, the no. of users within a 24-hour period may

be considered as per actuals.

Gross Area - The area of the floor within the inside perimeter of the outside walls of the floor

of the building under consideration with no deduction for corridors and passages, toilets,

internal walls, internal columns or other features for each occupancy. In case the common

213

passages are shared for different uses, then proportionate area of such common passages

shall be added to the plinth area of all the premises of the respective use.

The water requirement, wastewater generation, treatment and disposal in case of factories,

storage & hazardous buildings and traffic terminal stations have to be assessed separately

on a case-by-case basis and are not detailed herein. The details provided herein related to the

above buildings are only for general information.

c) Mixed use automatically selected based on the various types of

apartments / premises mentioned in Table-1b&1c.

(b)

Components to Water Requirement Assessment – Table-1d (as per Item

No. B above)

Mark Yes / No for the Components applicable for the Project to assess water

requirement.

(c)

Other information – Table-1e

1. Height of the building (of the tallest building in case of multiple buildings in the

Project) (m)

2. Largest Compartment Perimeter of Water Curtain of Car Parking Spaces in

any of the Basement Floors of the Project (m)

3. Basement Area (Sqm)

4. Area of landscape and type of landscape (lawn and other plantation areas)

Note: The water requirement for landscaping purposes is considered as,

a) For Lawns 7 Liters/Sqm/day and

b) For Other Landscapes like Shrubs and Trees 5 Liters /Sqm/day.

1.

Water Treatment Plant Tank Capacity (If provided)

2.

Quantity of water stored in Swimming pool

3.

Quantity of water stored in Other water bodies.

Note: 1. Make up water for Swimming Pool, Fish pond, Water fountain, etc. to

be considering based on

quantity of water evaporated and that required for backwash - 2% of total volume of stored water to be

considered as water requirement for Pool Make up, Fish pond, Water fountain, etc.

2. Quantity of water for initial filling of swimming pool & other water bodies and periodical replacement of

swimming pool & other water bodies are not considered.

4.

Capacity of Cooling tower* (Tonnage) for HVAC

5.

Capacity of Cooling tower* (Tonnage) for DG Set

Note: *Water consumption for Cooling Towers shall be considered as per the

manufacturer’s requirement and running hours of the systems.

6.

Market cleaning area (common areas and Fresh Fish & Meat area)

7.

Mall cleaning area (common areas of the Mall)

8.

Any other water components, to be specified.

D. WATER REQUIREMENT ASSESSMENT FOR RESIDENTIAL BUILDINGS

I. Occupant Assessment – Table-2a

214

The details of Table-2a are automatically calculated from Table-1b

II. Water Requirement, Wastewater Generation, Treated Water Usage &

Sewage/Excess Treated Water Disposal for Residential Buildings – Table-2b(2)

The following water requirements of the building (for all blocks together in case

of multiple blocks in a project and for the residential portion of the building in

case of mixed use building) in Table-2b(2) shall be automatically calculated from

Table-1d, Table-2a and Table-2b(1).

1.

Water requirement for residential use and other uses in common area per

person per day for domestic use and for treated water reuse.

2.

Water requirement for Club house facilities

a) Gym – 15 LPHD for Domestic & 10 LPHD for Flushing

b) Gym along with Jacuzzi, Steam, Sauna, ayurvedic therapy - 20 LPHD for

Domestic & 25 LPHD for Flushing.

3.

Water requirement for Building management team

1 person considered for 10 dwelling units & Water requirement considered is

25 LPHD for Domestic & 25 LPHD for Flushing

4.

Other requirements (to be specifically mentioned as additional

water

requirement)

Note:1. Only normal fixtures are considered, and water efficient plumbing fixtures are

considered only for providing additional incentives as per these Byelaws

2. Make up water for swimming pool & water bodies is considered based on

quantity of water evaporated and that required for backwash i.e., 2% of total

volume of

stored

water

to

be

considered

as

water

requirement].

3. Quantity of water for initial filling of swimming pool and water bodies and

periodical replacement of swimming pool & other water bodies are not

considered.

III. Storage of water for Fire Fighting Purposes – Table-2c(2) (For highrise

buildings - above 21m height)

The minimum requirement of UGT & OHT for Fire Fighting shall be automatically

calculated in Table-2c(2) from Table-2c(1).

Note: 1. One set of pumps shall be provided for each 100 hydrants or part thereof, with a maximum of two

sets. In case of more than one pump set installation, both pump sets shall be interconnected at their delivery

headers.

Alternative to provisions of additional set of pumps, the objective can be met byproviding additional diesel

pump of the same capacity and doubling the water tank capacity as required for one set of pumps.

IV. Septic Tank /Sullage Treatment Plant/ Sewage Treatment Plant Capacity –

Table-2d

1.

Buildings where UGD is available

a) Capacity of SuTP for 100% Sullage Treatment -

i. Total Sullage generated is calculated automatically from Column f

(B2) of Table-2b(2).

ii. The capacity of SuTP is calculated automatically adding 20% (for

contingencies) of the quantity calculated in (i) above and is rounded

off to multiples of 5 KLD.

215

b) Capacity of 100% SuTP & STP for additional treated water required:

i. Total Sullage generated is auto filled from Column f (B2) of Table-

2b(2).

ii. The Capacity of SuTP is calculated automatically

adding

20%

(for contingencies)of the quantity calculated in (i) above and

is

rounded off to multiples

of 5 KLD.

iii. Total treated water requirement will be calculated automatically

from Column j(B6) of Table-2b(2).

iv. Shortfall of treated water will be calculated automatically

by

deducting Total treated water

generated by SuTP fromthe total

treated water

required for the project.

v. The Capacity of STP is calculated automatically adding

20% (for

contingencies)of the quantity calculated in (iv) above and is rounded

off to the multiples of 5 KLD.

c) Capacity of 100% STP with RO Plant:

i. Total Sullage & Sewage generated is calculated

automatically

from Column h (B4) of Table-2b(2).

ii. Capacity of STP is calculated automatically adding 20% (for

contingencies)of the quantity calculated in (i) above and is rounded

off in the multiples of 5 KLD.

2.

Buildings where UGD is not available

a) For Small Buildings

100% Sullage disposed into Leach Pit & 100% Sewage disposed into Septic

Tank.

(Septic tanks are only recommended upto 15 KLD of Sewage generation and for small

communities and institutions where UGD connection not available.)

Note:For Size of Septic tank refer Design criteria and Construction of Septic Tanks (Ref: IS:

2470 (Part 1) – 1985) APPENDIX A, (Clause 3.4.5.2)

b) For Large Buildings

i. Capacity of 100% SuTP & 100% STP

(a) Total Sullage generated is calculated automatically from Column

f (B2) of Table-2b(2).

(b) The Capacity of SuTP is calculated automatically adding 20% (for

contingencies)of the quantity calculated in (a) above and is

rounded off to the multiples of 5 KLD.

(c) Total Sewage generated is calculated automatically from Column

g (B3) of Table-2b(2).

(d) The Capacity of STP is calculated automatically adding 20% (for

contingencies)of the quantity calculated in (c) above and is

rounded off to the multiples of 5 KLD.

ii. TheCapacity of 100% STP with RO Plant

(a) Total Sewage generated is auto filled fromColumn h (B4) of Table-

2b(2).

216

(b) Capacity of STP is calculated automatically adding 20% (for

contingencies)of the quantity calculated in (a) above and is

rounded off to the multiples of 5 KLD.

V. Centralised RO Plant -Table-2e(1) (If applicable)

1.

Capacity of RO plant for Drinking water supply is automatically

calculated in Table-2e(1) from Table-2a& Table-2b(2);

2.

The specifications of RO Plant to be entered in Table-2e(2)

VI. Centralised Hot Water System with Solar Thermal Collectors or Heat Pump

system- Table-2f (If applicable)

1. Centralised Hot water with Solar thermal collector system -

Capacity of Centralised Hot Water System with Solar Thermal Collector is

automatically calculated in Table-2f from Table-2a.

Note: 1. If more hot water requirement* is proposed than that mentioned below, the same to

be manually entered.

* Hot water requirement per person considered as,

- 15 Liters per Person shall be considered for MIG & supply for 12 Hrs is assumed.

- 20 Liters per Person shall be considered for HIG & supply for 15 Hrs is assumed.

2. Recommended SS hot water storage tank capacity, number of Solar Thermal Collectors of

125 Liters (Size 1 m x 2 m) and area required for installing Solar Thermal Collectors (2 Sqm per

125 Liters Collector) will be calculated automatically.

2.

Centralised Hot water with Heat pump system -

Capacity of Centralised Hot Water System with Heat Pump System is

automatically calculated in Table-2f from Table-2a.

Note: Supply gap of 7 hours is considered to fill the entire capacity of hot water storage tank,

assuming it is empty at the night after consumption.

VII. Water Tank Capacity

1.

Domestic Water Tank Capacity

a) Total Domestic UGT capacity (without SuTP or STP / with SuTP / with

SuTP & STP / with STP) is automatically calculated in Table-2g from

Table-2b(2)

b) Total Firefighting UGT capacity as per Table-2c(2)

c) Total Domestic OHT capacity (without SuTP or STP / with SuTP / with

SuTP & STP / with STP) is automatically calculated in Table-2g from

Table-2b(2)

d) Total Firefighting OHT capacity as per Table-2c (2)

2.

Treated Water Tank Capacity

a) Total Treated Water UGT capacity (with SuTP / with STP) is automatically

calculated in Table-2g from Table-2b(2)

b) Total Treated Water OHT capacity (with SuTP / with STP) is automatically

calculated in Table-2g from Table-2b(2)

217

3.

Water Treatment Plant Tank Capacity (If applicable) – To be

entered

manually.

VIII. Water Balance Chart

Water requirement quantities to be updated in each level of the Water balance

chart as per the Table-1 & Table-2 parameters.

E. WATER REQUIREMENT ASSESSMENT FOR NON-RESIDENTIAL BUILDINGS

I. Occupant Assessment & Domestic and Treated water Requirement for Non-

Residential Buildings

The following water requirements of the building (for all blocks together in case of

multiple blocks in a project and for the non-residential portion of the building in

case of mixeduse building) in Table-3a shall be automatically calculated from

Table-1c and Table-1e

1. Water requirement for Hotels (Excluding laundry, Kitchen, Staff

and

Water

bodies), based on Star rating (upto 3 Star, 4 Star and above)

2. Water requirement for Educational Building (Without boarding

facilities /With

boarding facilities/ Hostels)

3. Water requirement for Institutional: Hospital

i. (The water requirement includes requirement of patients, attendants, visitors and

staff. Additional water requirement for kitchen, laundry and clinical water shall be

computed as per actual requirements)

4. Water requirement forAssembly Building or Cinemas, Concert

halls

and

Theatres and Multiplex, or for Dining areas and restaurants or Food Court

5. Water requirement forBusiness Building: offices including

canteen.

6. Water requirement for Mercantile Building for Street floor and

sales

basement, Upper sales floor, Storage/warehouse.

7. Water requirement for Industrial Building for Factories including canteen

with

or without bathroom

8. Water requirement for Storage Building.

9. Water requirement for Hazardous Building.

10. Water requirement for traffic terminal stations, Airport, Railway

station

(Junction) with bathing facility, Railway station (Junction)

without

bathing

facility, Railway station (Intermediate) with

bathing facility, Railway station

(intermediate) without bathing

facility, Interstate Bus Terminals, Interstate

Bus Terminals/Metro Stations

Note: The water requirement for Industrial buildings, Storage & Hazardous buildings, and

Traffic Terminal Stations provided herein are for understanding the principles of assessment.

The water requirements for these buildings have to be calculated on a case-by-case basis.

II. Other water requirements for non-residential buildings-Table-3b

Other water requirements of the building in Table-3b shall be

automatically calculated from Table-1c and Table-1e

1.

Water requirement for Club house facilities

a) Gym – 15 LPHD for Domestic & 10 LPHD for Flushing

218

b) Gym along with Jacuzzi, Steam, Sauna, ayurvedic therapy - 20 LPHD for

Domestic & 25 LPHD for Flushing.

2.

Water requirement for Building management team

1 person considered as specified in ______ & Water requirement considered

is 25 LPHD for Domestic & 25 LPHD for Flushing

3.

Other requirements (to be specifically mentioned as additional

water

requirement)

III. Water Requirement, Wastewater Generation, Treated Water Usage &

Sewage/Excess Treated Water Disposal for Non-Residential Buildings – Table-

3c

The details of Table-3c is automatically calculated from Table-1c, Table-1e,

Table-3a and Table-3b

IV. Storage of water for Fire Fighting Purposes- Table-3d(1) (For highrise buildings

- above 21m height)

The minimum requirement of UGT & OHT for Fire Fighting shall be

automatically calculatedin Table-3d(2) from Table-3d(1).

V. Septic Tank /Sullage Treatment Plant/ Sewage Treatment Plant Capacity –

Table-3e

1.

Buildings where UGD is available:

a) Capacity of SuTP for 100% Sullage Treatment:

i. Total Sullage generated is calculated automatically of Table-3c.

ii. The capacity of SuTP is calculated automatically adding 20% (for

contingencies) of the quantity calculated in (i) aboveand is rounded

off to multiples of 5 KLD.

b) Capacity of 100% SuTP & STP for additional treated waterrequired:

i. Total Sullage generated is auto filled from of Table-3c.

ii. The capacity of SuTP is calculated automatically adding 20% (for

contingencies) of the quantity calculated in (i) and is rounded off to

multiples of 5 KLD.

iii. Total treated water requirement will be calculated automatically

from Table-3c.

iv. Shortfall of treated water will be calculated automatically by

deducting Total treated water generated by SuTP from the total

treated water required for the project.

v. The Capacity of STP is calculated automatically adding 20% (for

contingencies)of the quantity calculated in (iv) above and is rounded

off to multiples of 5 KLD.

c) Capacity of 100% STP with RO Plant:

i. Total Sullage & Sewage generated is calculated automatically

from of Table-3c.

219

ii. The Capacity of STP is calculated automatically adding (for

contingencies) of the quantity calculated in (i) above and is rounded

off to multiples of 5 KLD.

2.

Buildings where UGD is not available

a) For Small Buildings

100% Sullage disposed into Leach Pit & 100% Sewage disposed

into

Septic Tank.

(Septic tanks are only recommended upto 15 KLD of Sewage generation and for

small

communities and institutions where UGD connection not available.)

Note: For Size of Septic tank refer Design criteria and Construction of Septic Tanks (Ref: IS: 2470 (Part 1) –

1985) APPENDIX A, (Clause 3.4.5.2)

b)

For Large Buildings

i.

Capacity of 100% SuTP & 100% STP

(a)

Total Sullage generated is calculated automatically from Table-3c.

(b)

The Capacity of SuTP is calculated automatically adding 20% (for

contingencies)of the quantity calculated in (a) above and is rounded off to

multiples of 5 KLD.

(c) Total Sewage generated is calculated automatically from Table-3c.

(d) The Capacity of STP is calculated automatically adding 20%

(for

contingencies)of the quantity calculated in (c) aboveand is rounded off to

multiples of 5 KLD.

ii.

Capacity of 100% STP with RO Plant

(a) Total Sewage generated is auto filled fromof Table-3c.

(b) The Capacity of STP is calculated automatically adding 20% (for

contingencies)of the quantity calculated in (a) above and is rounded off to

multiples of 5 KLD.

VI. Centralised RO Plant -Table-3f(1) (If applicable)

1. Capacity of RO plant for Drinking water supply is automatically calculated

based on the requirement.

2. The specifications of RO Plant to be entered in Table-3f(2)

VII. Centralised Hot Water System with Solar Thermal Collectors or Heat Pump

system- Table-3g (If applicable)

1.

Centralised Hot water with Solar thermal collector system

Capacity of Centralised Hot Water System with Solar Thermal Collector is

automatically calculated based on the requirement.

2.

Centralised Hot water with Heat pump system

Capacity of Centralised Hot Water System with Heat Pump System is

automatically calculatedbased on the requirement.

VIII. Water Tank Capacity

220

1.

Domestic Water Tank Capacity

a) Total Domestic UGT capacity (without SuTP or STP / with SuTP / with

SuTP & STP / with STP) is automatically calculated in Table-3h from

Table-3c

b) Total Firefighting UGT capacity as per Table-3d

c) Total Domestic OHT capacity (without SuTP or STP / with SuTP / with

SuTP & STP / with STP) is automatically calculated in Table-3h from

Table-3c

d) Total Firefighting OHT capacity as per Table-3d

2.

Treated Water Tank Capacity

a) Total Treated Water UGT capacity (with SuTP / with STP) is automatically

calculated in Table-3h from Table-3c

b) Total Treated Water OHT capacity (with SuTP / with STP) is automatically

calculated in Table-3h from Table-3c

3.

Water Treatment Plant Tank Capacity (If applicable) – To be

entered

manually.

IX. Water Balance Chart

Water requirement quantities to be updated in each level of the Water balance chart

as per the Table-1 & Table-3 parameters.

221

TO BE ENTERED

I PROJECT INFORMATION

AUTO FILLED

1

Project Name

-

Date :

2

Address/Location

-

3

Building Category

(Residential / Non-Residentail / Mixed

Use)

DETAILS OF APARTMENTS / PREMISES

a)

INPUT FOR OCCUPANT LOAD (RESIDENTIAL)

MINIMUM

MAXIMUM

EWS

1 BHK

> 30

< 40

1 BHK

> 40

< 50

2 BHK

> 45

< 60

1 BHK

> 50

< 60

2 BHK

> 60

< 70

3 BHK

> 75

< 95

1 BHK

> 60

< 70

2 BHK

> 70

< 95

3 BHK

> 95

< 120

1 BHK

> 70

2 BHK

> 95

3 BHK

> 120

4 BHK &

ABOVE

EWS

LIG-A

LIG-B

MIG

HIG

LIG-A

LIG-B

MIG

HIG

LIG-B

MIG

HIG

HIG

>30 <40

>40 <50

>50 <60

>60 <70

>70

>45 <60

>60 <70

>70 <95

>95

>75 <95

>95 <120

>120

>120

a

b

c

d

e

f

g

h

i

j

k

l

m

n

0

0

TOTAL

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

Percentage

#DIV/0!

#DIV/0!

#DIV/0!

#DIV/0!

#DIV/0!

Note: Service Apartments, Studio Apartments, 4 BHK & above Apartments shall be considered in HIG Category.

b)

INPUT FOR OCCUPANT LOAD (NON-RESIDENTIAL)

i Group A: Hotels:

Type of Occupancy

No. of

Beds

No. of

Staffs

No. of

Restaurant

Seats

Water

requirement

for Laundry

Water

requirement

for Kitchen

No. of Kitchen Staffs

Water

requirment for

Water Bodies

upto 3 star rating

4 star and above

ii Group B: Educational:

Strength of

School

No. of

Teaching

Staff

No. of Non-

Teaching Staff

No. of Beds

No. of

Warden

Residence

No. of Hostel

Staffs

iii

iv

Group C: Institutional: Hospital:

Gross Area

(Sqm)

v

Group D: Assembly:

Gross Area

(Sqm)

No. of Seats

vi

Group E: Business: (including canteen)

Gross Area

(Sqm)

vii

Group F: Mercantile:

Gross Area (Sqm)

viii Group G: Industrial:

Gross Area (Sqm)

Factories including canteen where bath rooms are required to be provided

Factories including canteen where no bath rooms are required to be provided

ix

Group H: Storage:

Gross Area (Sqm)

Storage

x

Group J: Hazardous

Gross Area (Sqm)

Hazardous

xi

Traffic Terminal Stations

Seasonal average

peak passangers

handled

II COMPONENTS OF BUILDING RELATED TO WATER REQUIREMENT (Mark 'YES/NO' in the relevant spaces below based on the requirements of the Project)

1

A

2

3

4

5

6

7

8

B

1

1

2

Gravity Distribution System (From OHT)

3

-

TABLE - 1a

AREA DETAILS FOR APARTMENT CATEGORIES

TABLE-1

GENERAL INFORMATIONS OF THE PROJECT

Type of Occupancy

Without boarding facilities

With boarding facilities

TABLE - 1c

Type of Occupancy

CATEGORY

BHK

CARPET AREA (Sqm)

LIG-A

LIG-B

MIG

From Private Well (Without WTP)

From Private Well (With WTP)

Type of Occupancy

Street floor and sales basement

Upper sales floor

Storage/warehouse, receiving and the like

HIG

TABLE - 1b

BLOCKS

NO. OF APARTMENTS IN THE PROJECT UNDER VARIOUS CATEGORIES

1BHK

2BHK

3BHK

TOTAL

Type of Occupancy

Airports

Railway station (Junction) without bathing facility

Railway station (Intermediate) with bathing facility

Railway station (Intermediate) without bathing facility

Interstate Bus Terminals

Direct Supply System From Centralised Water Supply

System (MCC Or Private)

Buildings where UGD is not available

100% Sullage and Sewage treatment in STP/ETP for reuse of treated water and the excess treated

water to be further treated in RO Plant for domestic use

Rain Water Harvesting (Without WTP)

From Private Borewell (With WTP)

2 100% Sullage Treatment in SuTP & Sewage treatment in STP/ETP to the extent of additional treated

water required & Excess sewage disposal into UGD

2 FOR LARGE BUILDINGS

a. 100% Sullage treated in SuTP & 100% Sewage treated in STP/ETP for reuse of treated water &

Excess Treated Water to be used for Ground Water Recharge or Disposal into Storm Water Drains

Interstate Bus Terminals/Metro Stations

From Private Borewell (Without WTP)

FOR SMALL BUILDINGS

100% Sullage disposed into Leach Pit & 100% Sewage disposed into Septic Tank

DOSMESTIC WATER DISTRIBUTION SYSTEM

Hostel

Type of Occupancy

Business: (including canteen)

1 100% Sullage Treatment in SuTP & Excess Treated Water to be used for Ground Water Recharge or

Disposal into Storm Water Drains & 100% Sewage disposal into UGD

Type of Occupancy

No. of beds not exceeding 100

No. of beds exceeding 100

Out patient department (OPD)

Type of Occupancy

Concentrated use without fixed seating

TABLE - 1d

SOURCE OF DOMESTIC WATER SUPPLY

SEWERAGE SYSTEM

From MCC Water Supply System

Buildings where UGD is available

Type of Occupancy

Type of Occupancy

Type of Occupancy

Railway station (Junction) with bathing facility

Less concentrated use without fixed seating

Fixed seating (Cinemas, Concert halls and Theaters and Multiplex)

Dining areas and restaurants with seating and table (water requirement including

kitchen)

Food court (water requirement including kitchen)

Water Tankers

Rain Water Harvesting (With WTP)

3

Pressurised Distribution System (Hydro Pneumatic

Pumping System)

b. 100% Sullage and Sewage treatment in STP/ETP for reuse of treated water and the excess treated

water to be further treated in RO Plant for domestic use

222

1

2

1

3

2

4

5

3

6

4

7

8

9

10

A

C

1

1

2

2

B

D

1

1

2

2

E

III OTHER INFORMATIONS

1

Meters

2

Meters

3

Area of Basement

SqM

4

Landscape Area

a) Lawns

SqM

SqM

5

Litres

6

Water Stored in Swimming Pool

Litres

7

Water Stored in Other water

bodies

Litres

8

Litres

9

Litres

10

SqM

11

SqM

12

Any other water components, to be

specified

Water Treatment Plant Tank Capacity (If

provided)

HVAC Cooling Tower water requirement as

per manufacturers standards

DG Set Cooling Tower water requirement

as per manufacturers standards

b) Other Landscape -Shrubs and Trees

Height of the building (of the tallest

building in case of multiple buildings in

the Project) (m)

Largest Compartments Perimeter of Water

Curtain of Car Parking Spaces in any of

the Basement Floors in the project (If

applicable)

Under Ground Tank (UGT)/ Sump Tank

Electric Geyser for individual units

Gas Geyser for individual units

Over Head Tank (OHT)

Fire Storage Tank

Under Ground Tank (UGT)/ Sump Tank

WATER TANKS

Domestic Water Tank

Treated Water Tank

Common area and Fresh Fish & meat area

of markets (For Cleaning)

Common area in Mall (For Cleaning)

TABLE 1e

RO Water Tank

Cooling Tower for HVAC

Cooling Tower for DG Sets

Other Water Components

Water Treatment Plant

Under Ground Tank (UGT)/ Sump Tank

Over Head Tank (OHT)

Other Tanks

Only Gym

Hot Water Tank

Over Head Tank (OHT)

WTP Tank

Gym Along With Jacuzzi, Steam, Sauna, Ayurvedic Therapy, Etc.

OTHER BUILDING COMPONENTS

Centralised Solar Water Heating System using Solar

Thermal Collectors

Landscape/Garden

Other Water Bodies

Centralised RO Plant

HOT WATER GENERATION SYSTEM

Swimming Pool

Centralised Heat Pump System

223

D

I OCCUPANT ASSESSMENT FOR WATER REQUIREMENT FOR RESIDENTIAL BUILDINGS

d = b x c

e

f = d x e

1

-

1.0

-

2

-

1.0

-

-

1.0

-

-

3

-

1.0

-

-

1.0

-

-

1.0

-

-

4

-

0.9

-

-

0.9

-

-

0.9

-

-

5

-

0.85

-

-

0.85

-

-

0.85

-

-

0.85

-

-

0

-

(A2)

*

DIVERSITY OF OCCUPANCY

-

1

HIG (85% Occupancy) =

0.85

-

2

MIG (90% Occupancy) =

0.90

3

LIG-B (100% Occupancy) =

1.00

4

LIG-A (100% Occupancy) =

1.00

5

EWS (100% Occupancy) =

1.00

***Building manangement team (1 staff considered for 10 Units).

II WATER REQUIREMENT, WASTE WATER GENERATION, TREATED WATER USAGE & SEWAGE/EXCESS TREATED WATER DISPOSAL FOR RESIDENTIAL BUILDINGS

FOR HIG APARTMENTS (CONSIDERING 225 LPHD)

FOR MIG APARTMENTS (CONSIDERING 200 LPHD)

a

b

c

d

d1

d2

a

c

d

d1

d2

Residential usage

Residential usage

1

Bathing (including hand wash,

shaving, health faucet)

1

60

42

18

1

1

55

39

16

2

Toilet Flushing

1

60

60

0

2

1

58

58

0

3

Washing Cloths

1

20

20

0

3

1

20

20

0

4

Cleaning house

0.8

12

12

0

4

0.8

10

10

0

5

Washing Utensils

1

14

10

4

5

1

12

8

4

6

Cooking

0

7

7

0

6

0

6

6

0

7

Drinking

0

4

4

0

7

0

3

3

0

8

Toilet Cleaning

1

9

9

0

8

1

7

7

0

Other usage in common areas

0

Other usage in common areas

0

9

Corridor, Staircases, Terrace,

Civic amenity spaces & other

Common area cleaning

0.8

9

9

0

9

0.8

7

7

0

10

Yard Cleaning

0

5

5

0

10

0

4

4

0

11

Parking areas

0.2

5

5

0

11

0.2

3

3

0

12

Landscape irrigation

0

6

6

0

12

0

5

5

0

13

Swimming Pool makeup

0.2

5

5

0

13

0.2

4

4

0

14

Other water bodies

0.2

3

3

0

14

0.2

2

2

0

15

Car wash

0.5

6

6

0

15

0.5

4

4

0

Grand Total

225

203

22

200

180

20

FOR LIG-B APARTMENTS (CONSIDERING 175 LPHD)

FOR LIG-A / EWS APARTMENTS (CONSIDERING 150 LPHD)

a

b

c

d

d1

d2

a

c

d

d1

d2

Residential usage

1

Bathing (including hand wash,

1

53

37

16

1

1

53

37

16

2

Toilet Flushing

1

55

55

0

2

1

50

50

0

3

Washing Cloths

1

17

17

0

3

1

15

15

0

4

Cleaning house

0.8

7

7

0

4

0.8

5

5

0

5

Washing Utensils

1

9

6

3

5

1

6

4

2

6

Cooking

0

6

6

0

6

0

4

4

0

7

Drinking

0

3

3

0

7

0

2

2

0

8

Toilet Cleaning

1

5

5

0

8

1

4

4

0

Other usage in common areas

0

0

9

Corridor, Staircases, Terrace,

Civic amenity spaces & other

Common area cleaning

0.8

6

6

0

9

0.8

4

4

0

10

Yard Cleaning

0

3

3

0

10

0

2

2

0

11

Parking areas

0.2

2

2

0

11

0.2

1

1

0

12

Landscape irrigation

0

4

4

0

12

0

3

3

0

13

Swimming Pool makeup

0.2

2

2

0

13

0.2

0

0

0

14

Other water bodies

0.2

1

1

0

14

0.2

0

0

0

15

Car wash

0.5

2

2

0

15

0.5

1

1

0

Grand Total

175

156

19

150

132

18

Note:

1. Landscape Irrigation water requirement vary from project to project depends on landscape area provided.

2. Water consumption for operating and maintenace staffs to be considered at actual depends on the project size.

3. Water consupmtion for Clubhouse and amenity users to be considered at actual depending on the project size.

4. * Water requirements is considered based on normal fixtures and water efficient plumbing fixtures are considered only for providing additional incentives as per these Byelaws

EWS/LIG-A

LIG-B

MIG

HIG

Grey water

Black Water

Total

Sewage

Domestic

Treated

Sullage

Total

Domestic

Treated

Sewage

Total

a

b

c

d

d

d

d

e = d x No of

Occupants

f = c x e

g = c x e

h = f + g

i = e

j = e

k = i + j

l = e

m = e

n = l + m

(i)

RESIDENTIAL USAGE

1

Bathing

1.0

53.0

53.0

55.0

60.0

-

-

-

-

-

-

-

2

Toilet Flushing

1.0

50.0

55.0

58.0

60.0

-

-

-

-

-

-

-

3

Washing Cloths

1.0

15.0

17.0

20.0

20.0

-

-

-

-

-

-

-

4

Cleaning house

0.8

5.0

7.0

10.0

12.0

-

-

-

-

-

-

-

5

Washing Utensils

1.0

6.0

9.0

12.0

14.0

-

-

-

-

-

-

-

6

Cooking

0.0

4.0

6.0

6.0

7.0

-

-

-

-

-

-

-

7

Drinking

0.0

2.0

3.0

3.0

4.0

-

-

-

-

-

-

-

8

Toilet Cleaning

1.0

4.0

5.0

7.0

9.0

-

-

-

-

-

-

-

OTHER USAGE IN COMMON AREAS

9

Corridor, Staircases, Terrace,

Civic amenity spaces & other

Common area cleaning

0.8

4.0

6.0

7.0

9.0

-

-

-

-

-

-

-

10

Yard Cleaning

0.0

2.0

3.0

4.0

5.0

-

-

-

-

-

-

-

11

Parking areas

0.2

1.0

2.0

3.0

5.0

-

-

-

-

-

-

-

12

Landscape irrigation

0.0

3.0

4.0

5.0

6.0

-

-

-

-

-

-

-

13

Swimming Pool makeup

0.2

0.0

2.0

4.0

5.0

-

-

-

-

-

-

-

14

Other water bodies

0.2

0.0

1.0

2.0

3.0

-

-

-

-

-

-

-

15

Car wash

0.5

1.0

2.0

4.0

6.0

-

-

-

-

-

-

-

OTHER WATER REQUIREMENTS FOR RESIDENTIAL BUILDINGS

(ii)

Club House Facilities (See Reference 1 (i) or 1 (ii))

a) Gym

Domestic

0.8

15.0

15.0

15.0

-

-

-

-

-

-

-

Flushing

1.0

10.0

10.0

10.0

-

-

-

-

-

-

-

b) Gym along with Jacuzzi, Steam, Sauna, Ayurvedic therapy, etc

Domestic

0.8

25.0

25.0

25.0

-

-

-

-

-

-

-

Flushing

1.0

20.0

20.0

20.0

-

-

-

-

-

-

-

(iii)

Building manangement team (1 staff considered for 10 Units)

Domestic

0.8

25.0

25.0

25.0

25.0

-

-

-

-

-

-

-

Flushing

1.0

20.0

20.0

20.0

20.0

-

-

-

-

-

-

-

(iv)

Other requirements if any

Sl No

Usage Area

Waste

water

recovery

factor

Water

Requirem

ent per

person per

day

(Ltrs/pers

on/day)

* Water

Requirement

per person per

day with

water

efficient

plumbing

fixtures (Ltrs

/ person /

day)

TABLE-2b(2)

Waste Water Generation (Litres)

Water Usage if Sullage Treatment

Plant (Litres)

Water Usage if Sewage

Treatment Plant (Litres)

Total Water

requirement

(Litres)

Landscape irrigation

Swimming Pool makeup

Other water bodies

Car wash

Grand Total

* Water

savings

(With water

efficient

plumbing

fixtures)

(Ltrs /

person / day)

Water

Requiremen

t per person

per day

(Ltrs/person

/day)

* Water

Requirement

per person per

day with

water

efficient

plumbing

fixtures (Ltrs

/ person /

day)

Corridor, Staircases, Terrace,

Civic amenity spaces & other

Common area cleaning

Yard Cleaning

Water Requirement per person per day

(Ltrs/person/day)

(Refer Table 1d)

Sl No

Parking areas

Cleaning house

Washing Utensils

Cooking

Drinking

Toilet Cleaning

Other usage in common

Car wash

b

Residential usage

Usage Area

Water

Requiremen

t per person

per day

(Ltrs/person

/day)

* Water

Requirement

per person per

day with

water

efficient

plumbing

fixtures (Ltrs

/ person /

day)

* Water

savings

(With water

efficient

plumbing

fixtures)

(Ltrs /

person /

day)

Bathing (including hand

Toilet Flushing

Cooking

Cleaning house

Washing Utensils

Sl No

Toilet Flushing

Washing Cloths

b

* Water

savings

(With water

efficient

plumbing

fixtures)

(Ltrs /

person /

day)

Waste

water

recovery

factor

Drinking

Toilet Cleaning

Corridor, Staircases, Terrace,

Civic amenity spaces & other

Common area cleaning

Yard Cleaning

Parking areas

Landscape irrigation

Swimming Pool makeup

Other water bodies

Sl No

Usage Area

Waste

water

recovery

factor

Water

Requirem

ent per

person per

day

(Ltrs/pers

on/day)

* Water

Requirement

per person per

day with

water

efficient

plumbing

fixtures (Ltrs

/ person /

day)

* Water

savings

(With water

efficient

plumbing

fixtures)

(Ltrs /

person / day)

Waste

water

recovery

factor

Building manangement team*** (A5 = A1 x 10%)

Total No of Occupants (Rounded off) (A3 = Round off A2)

Clubhouse amenities** (15% Occupancy considered)(A4 = A3 x 15%)

(A1)

MIG

1 Bedroom Dwelling Unit

[15 percent of population considered to use the building facilities in residential buildings. (Ref: Part

9, Section 1, Clause 1.1.b Notes 2 of NBC 2016)].

1 Bedroom Dwelling Unit

2 Bedroom Dwelling Unit

3 Bedroom Dwelling Unit

Usage Area

DOMESTIC WATER, TREATED WATER & TOTAL WATER REQUIREMENT WITH & WITHOUT WATER EFFICIENT PLUMBING FIXTURES

4

5

6

-

-

-

-

-

-

-

HIG

2 Bedroom Dwelling Unit

3 Bedroom Dwelling Unit

4 Bedroom Dwelling Unit and above

TABLE-2b(1)

a

b

c

3 Bedroom Dwelling Unit

-

6

EWS

1 Bedroom Dwelling Unit

-

4

1 Bedroom Dwelling Unit

2 Bedroom Dwelling Unit

-

4

-

LIG-A

1 Bedroom Dwelling Unit

2 Bedroom Dwelling Unit

-

5

LIG-B

-

4

7

6

5

4

5

TABLE - 2

WATER REQUIREMENT ASSESSMENT FOR RESIDENTIAL BUILDINGS

Sl

No

TYPE OF DWELLING UNITS

NO. OF DWELLING

UNITS

NO. OF PERSONS PER

UNIT

(Ref: Part 9, Section 1,

Clause 4.1.a of NBC 2016)

TOTAL NO.

OF

PERSONS

DIVERSITY

OF

OCCUPANCY

*

TOTAL NO.

OF

OCCUPANTS

AFTER

DIVERSITY

TABLE-2a

TOTAL

0

Grand Total

**Occupancy for using building facilities/ Club house (Excluding EWS & LIG-A) = Total No. of

persons (A2) x15%.

Washing Cloths

Bathing (including hand

wash, shaving, health faucet)

Sl

No

Usage Area

Waste

water

recovery

factor

224

Total

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

(B1)

(B2)

(B3)

(B4)

(B5)

(B6)

(B7)

(B8)

(B9)

(B10)

Treated water Generation

-

-

Excess Treated water disposal

-

-

Raw Sewage Disposal

-

REFERENCES:

1

Water Requirement

i. Gym - Domestic -15 lphd and Flushing 10 lphd considered.

2

No of persons for building management team (A5), 10% of no. of dwelling units

Water Requirement

Offices (Including canteen) - Domestic -25 lphd and Flushing 20 lphd (Ref: Part 9, Section 1, Table 1, Sl No: viii of NBC 2016)

III

STORAGE OF WATER FOR FIRE FIGHTING PURPOSES

Sl

No

UG Static

water storage

tank #

Terrace

Tank #

Remarks

A

Residential Buildings

a)

Lodging and Rooming Houses (A-1) (see note 3)

1) Less than 15m in height

i) Upto 15 rooms

NR

5000

(see note 1)

ii) More than 15 and upto 30 rooms

NR

5000

(5000)

(see note 2)

iii) More than 30 rooms

NR

10000

(5000)

(see note 2)

b)

One or two Family Private Dwellings (A-2)

NR

NR

c)

Dormitories (A-3) and Apartment Houses (A-4)

1) Less than 15 m in height

NR

5000

(5000)

(see note 2)

2) 15 m and above but not exceeding 35 m in height

NR

25000

3) Above 35 m but not exceeding 45 m in height

75000

5000

4) Above 45 m but not exceeding 60 m in height

150000

10000

5) Above 60 m in height

200000

10000

i)

-

Mtrs

ii)

Ltrs (C1)

Ltrs (C2)

-

Lts (C3=C1+C2)

iii)

Lts (C4)

NOTES AND REFERENCES:

#

**

(No of nozzles in largest compartment perimetre = (Largest compartment perimeter /3.0m +1 Nos & Flow rate per nozzle = 33 LPM)

1. Required to be provided if basement area exceeds 200 Sqm

2. Additional value given in peranthesis shall be added if basement area exceeds 200 Sqm

3. Buildings above 15 m in height are not to be permitted for occupancies A-I and A-2.

IV

SEPTIC TANK / SULLAGE TREATMENT PLANT/ SEWAGE TREATMENT PLANT CAPACITY (The recycled water should be used for Toilet Flushing, Cleaning and Landscape Irrigation purposes)

1 BUILDINGS WHERE UGD IS AVAILABLE

2 BUILDINGS WHERE UGD IS NOT AVAILABLE

a) Capacity of 100% SuTP

Total Sullage generated (Table 1e(2), column f (B2) (D1)

-

Lts/day

Add 20% extra capacity for contingencies (D2 = D1 +20%)

-

Lts/day

Required SuTP Capacity (D3 = D2/1000)

-

KLD

b) For Large Buildings

Recommended SuTP Capacity (Round off in multiples of 5KLD) (D4)

KLD

i. Capacity of 100% SuTP & 100% STP

Required SuTP Capacity (D3)

-

KLD

b) Capacity of 100% SuTP & STP for additional treated water required

Recommended SuTP Capacity (Round off in multiples of 5KLD) (D4)

KLD

Required SuTP Capacity (D3)

-

KLD

Total Black water generated (Table 1e(2), column g (B3) (D15)

-

Lts/day

Recommended SuTP Capacity (Round off in multiples of 5KLD) (D4)

KLD

Add 20% extra capacity for contingencies (D16 = D15 +20%)

-

Lts/day

Treated water generated from SuTP (D5 = D1 x 95%)

-

Lts/day

Required STP Capacity (D17 = D16/1000)

-

KLD

Total treated water required [Table 1e(2), column j (B6)] (D6)

-

Lts/day

Recommended STP Capacity (Round off in multiples of 5KLD) (D18)

KLD

Shortfall of SuTP Treated water (D7 = D6-D5)

-

Lts/day

Add 20% extra capacity for contingencies (D8 = D7 +20%)

-

Lts/day

ii. Capacity of 100% STP with RO Plant

(for the shortfall in treated water requirement to be treated in STP)

Total Sewage generated [Table 1e(2), column h (B4)] (D19)

-

Lts/day

Required STP Capacity (D9 = D8/1000)

-

KLD

Add 20% extra capacity for contingencies (D20 =D19 +20%)

-

Lts/day

Recommended STP Capacity (Round off in multiples of 5KLD) (D10)

KLD

Required STP Capacity (D21 = D20/1000)

-

KLD

c) Capacity of 100% STP with RO Plant

Recommended STP Capacity (Round off in multiples of 5KLD) (D21)

KLD

Total Sewage generated [Table 1e(2), column h (B4)] (D11)

-

KLD

Add 20% extra capacity for contingencies (D12 = D11 +20%)

-

Lts/day

Notes:

Required STP Capacity (D13 = D12/1000)

-

KLD

Recommended STP Capacity (Round off in multiples of 5KLD) (D14)

KLD

V

CAPACITY OF RO PLANT FOR DRINKING WATER SUPPLY

i) No of Occupants

-

Nos

ii) Diversity of Occupancy

0.90

iii) Drinking water requirement per person per day *

3.00

Litres

iv)

-

LPD

v) Required RO Plant Capacity per hour (¼ th of the total drinking water requirement)** =

-

LPH

vi) Recommended RO plant capacity (Round off in multiples of 250 LPH)=

LPH

vii) RO Plant SS water storage tank capacity (Round off in multiples of 250 Lits) # =

-

Litres

RO PLANT SPECIFICATIONS

Sl.

No.

i)

ii)

iii)

iv)

v)

vi)

Notes:

* Drinking Water requirement should be assessed as per Table 1e, column 'd'

**

# Storage tank capacity for 1 day's requirement

VI

1. CENTRALISED SOLAR HOT WATER SYSTEM WITH SOLAR THERMAL COLLECTORS

1)

No of Occupants

-

Nos

2)

Diversity of Occupancy

0.90

3)

Hot water requirement per person per day *

Litres

* Hot Water requiment for Residential apartment buildings

a) 15 Liters per Person shall be considered for MIG & Supply for 12 Hrs is assumed

b)

Note: If more hot water requirement is proposed, the same has to be mentioned.

4)

=

-

Ltrs (E1)

5)

Add wastage of 5% (E2 = E1 + 5%)

=

-

Ltrs (E2)

6)

=

Ltrs (E3)

7)

SS Hot Water Storage Tank Capacity Required# [E4 = 80% of the Recommended Hot Water requirement (E3)]

=

-

Ltrs (E4)

# Assuming 80% of the people will take bath at the peak hour consumption of hot water from 6:30am to 8:30am.

8)

Recommended SS Hot Water Storage Tank Capacity [E5 = Rounded off value of (E4) in multiples of 125Lit]

=

Ltrs (E5)

9)

=

-

Nos (E6)

10)

=

-

SqM (E7)

2. CENTRALISED HOT WATER SYSTEM WITH HEAT PUMP

11)

=

-

Ltr/Hr (E8)

##

12)

=

T (E9)

13) Electrical Power Consumption of the Heat Pump (25% of the Rated output power, Refer ### )

=

kW (E10)

Standards for the selection of Heat Pump with Rated Output Power and Hot Water at the Temperature of 60◦C from the ambient Temp. of 25◦C =35◦C Delta T

a) For Small Buildings

100% Sullage disposed into Leach Pit & 100% Sewage disposed into Septic Tank

CENTRALISED HOT WATER SYSTEM WITH HEAT PUMP AND SOLAR THERMAL COLLECTORS FOR RESIDENTIAL BUILDINGS (TO

CALCULATE THE CAPACITY/SIZE OF THE SYSTEM)

(UPTO 21 Mtrs BUILDING HEIGHT, NO FIRE SERVICES REQUIRED AS PER THE KARNATAKA FIRE FORCE (AMMENDMENT) ACT

2023, DATED 27-07-2023)

MINIMUM REQUIREMENTS OF UGT & OHT FOR FIRE FIGHTING

Recommended Hot Water requirement (E3 = Rounded off value of (E2) in multiples of 125Lit.)

Total Hot water requirement (Hot water requirement per person x Total No. of Persons x Diversity of

Occupancy) (E1)

Specifications

TABLE-2d

Type of Building Occupnacy

TABLE-2c(2)

TABLE-2c(1)

TABLE-2f

6hours/day of maximum running time of RO Plant considered (RO membrane shall be replaced every 2200 hours of running

(size of each membrane is 250LPH) ie. The life of membrane is 2200/6hrs =365days = 1 year)

Height of Building

UNDERGROUND TANK (SUMP TANK) CAPACITY

a) For Wet Riser, Yard Hydrant and Sprinklers per set of pumps

[Refer Table 1f(1)]

b) For Water Curtain (If applicable) **

TOTAL SUMP TANK CAPACITY =

OVERHEAD (TERRACE) TANK CAPACITY [Refer Table 1f(1)]

TABLE-2e(2)

1. Providing Sullage/Sewage Treatement Plant is a mandatory requirement for the residential buildings having

Waste water generation more that 80 KLD or 120 Nos of Flats.

2. Sullage/Sewage Treatment Plant or Septic tanks should be provided, if UGD system is not available for all

Buildings (Septic Tank shall be permitted for buildings upto 300 users) (Refer, IS : 2470 (part 1) -1985 for

Design criteria and Construction of Septic Tanks)

Description

Capacity of Plant

Membrane Material & Size

Water quality indicator

Controls system

TABLE-2e(1)

Storage Tanks Capacity

Optional Components like Ultra Violet treatment, Ozonation, Micron Filters (0.2 Micron), pH

Booster, Mineral Booster, etc.

Area Required for installing Solar Thermal Collectors (2 SqM required / 125 Litre Solar Thermal

Collector Panel (100Kg/Collector with water)) (E7= 2 SqM x E6)

Septic tanks are only recommended for small communities and institutions whose contributory population does not

exceed 300 (Refer: NBC 2016, Part 9, Section 2, Clause 4.5.14.5.2 Septic Tanks) or Sewage/Black Water generation

is less than 15 KLD whichever is higher. Refer Design criteria and Construction of Septic Tanks (Ref: IS: 2470 (Part

Total Drinking water requirement

{No. of Occupants x Diversity of Occupancy x Drinking water per person per day) =

Refer Table 7, Minimum Requirements for Fire Fighting Installations Part 4 Fire and Life Safety of NBC 2016

5. Alternative to provisions of additional set of pumps, the objective can be met by providing additional diesel pump of the same capacity and doubling

the water tank capacity as required for one set of pumps. (refer Note 23, Table 7, Minimum Requirements for Fire Fighting Installations Part 4 Fire

and Life Safety of NBC 2016 )

Water requirement for water curtain nozzles for 60 minutes considering the largest compartment's perimeter out of all compartments of car parking

in any of the basement. (Ref: Annex H (Clause 6.4.2.2. and 6.8.1.5), Clause H-4.c, Part 4 - Fire and life safety of NBC 2016)

Tank size required (Litres) = No. of nozzles (in the perimeter of the Largest compartment) x Flow rate per water curtain nozzle (LPM) x 60 Minutes.

20 Liters per Person shall be considered for HIG& Supply for 15 Hrs is assumed

Occupancy for using building facilities/ Club house (A4)

Number of 125 Lit. Solar Thermal Collectors (Size 1m x 2.0m)(E6 = E3 /125 = No. of Collectors)

Hot Water required per hour from Heat Pump (E8 = E4 / 7 Hours ##)

Hot Water supply gap 7 hours considered to fill the entire capacity of Hot water storage tank, assuming

it is empty at the night after consumption

Recommended Heat Pump Capacity (Refer ###)

15 percent of population considered to use the building facilities in residential buildings. (Ref: Part 9, Section 1, Clause 1.1.b Notes 2 of NBC 2019)

4. One set of pumps shall be provided for each 100 hydrants or part thereof, with a maximum of two sets. In case of more than one pump set

installation, both pump sets shall shall be interconnected at their delivery headers. (Refer Note 22, Table 7, Minimum Requirements for Fire Fighting

Installations Part 4 Fire and Life Safety of NBC 2016)

ii. Gym along with Jacuzzi, Steam, Sauna, Ayurvedic therapy, etc.- Domestic -25 lphd and Flushing 20 lphd (Ref: Part 9, Section 1, Table 1, Sl No: x of NBC 2016)

Building manangement team

225

###

VII

WATER TANK CAPACITY

1

DOMESTIC WATER TANK CAPACITY *

a)

-

Litres

~

Litres

(G1)

66.70%

100.00%

b)

-

Litres

~

Litres

(G2)

66.70%

100.00%

c)

-

Litres

~

Litres

(G3)

66.70%

100.00%

d)

-

Litres

~

Litres

(G4)

66.70%

100.00%

e) TOTAL FIRE FIGHTING UG TANK CAPACITY AS PER Table 1f(2) (C3)

-

Litres

~

Litres

(G5)

f)

-

Litres

~

Litres

(G6)

33.30%

16.67%

g)

-

Litres

Litres

(G7)

33.30%

16.67%

h)

-

Litres

~

Litres

(G8)

33.30%

16.67%

i)

-

Litres

~

Litres

(G9)

33.30%

16.67%

j) TOTAL FIRE FIGHTING OVERHEAD TANK CAPACITY AS PER Table 1f(2) (C4)

-

Litres

~

Litres

(G10)

2

TREATED WATER TANK CAPACITY *

a)

-

Litres

~

Litres

(H1)

66.70%

100.00%

b)

-

Litres

~

Litres

(H2)

66.70%

100.00%

c)

-

Litres

~

Litres

(H3)

33.30%

16.67%

d)

-

Litres

~

Litres

(H4)

33.30%

16.67%

3

-

Litres

~

Litres

(I)

NOTES & REFERENCES:

* General guide lines for calculation of capacity of these storage tanks are as follows (Ref: Part 9, Section 1, Clause 4.4.10 of NBC 2016)

a) ln case only OHT is provided, it maybe taken as 33.3 to 50 percent of 1.2 times of one day’s requirement;

b) In case only UGT is provided, it maybe taken as 50 to 150 percent of 1.2 times ofone day’s requirement; and

c) In case combined storage is provided, it maybe taken as 66.7 percent UGT and 33.3 percent OHT of 1.2 times of one day’s requirement.

** In case Hydropneumatic system used, it maybe taken as 100 percent for UGT of one day's requirement and 16.65 percent OHT of 1.2 times of one day's requirement.

VIII WATER BALANCE CHART

TABLE-2g

WATER TREATMENT PLANT TANK CAPACITY (If applicable)

TOTAL DOMESTIC OHT CAPACITY = 33.3% of Requirement per day** = 0.333 x 1.2 x [Without Sewage/Sullage Treatment Plant

B1, from Table 1e(2)]

TOTAL TREATED WATER UGT CAPACITY = 66.7% of Requirement per day = 0.667 x 1.2 x [With Sullage Treatment Plant B6 from

Table 1e(2)]

1 T =3.3kW =81L/Hr, 1.5T =4.9kW =120L/Hr, 2 T =6.8kW =167L/Hr, 3 T =11.2kW =275L/Hr, 5 T =18.8kW =462L/Hr, 6 T =22kW =540L/Hr, 8 T =30kW

=737L/Hr, 10 T =38kW =934L/Hr, 12 T =44kW =1081L/Hr, 15 T =58kW =1425L/Hr, 20 T =75kW =1843L/Hr, 25 T =86kW =2113L/Hr. (1kW = 860Kcal is

considered)

TOTAL TREATED WATER OHT CAPACITY = 33.3% of Requirement per day = 0.333 x 1.2 x [With Sullage Treatment Plant B6 from

Table 1e(2)]

TOTAL DOMESTIC UG TANK CAPACITY = 66.7% of 1.2 x Requirement per day** = 0.667 x 1.2 x [With Sewage Treatment Plant

B8, from Table 1e(2)]

TOTAL DOMESTIC UGT CAPACITY = 66.7% of 1.2 x Requirement per day** = 0.667 x 1.2 x [With Sullage Treatment Plant B5,

from Table 1e(2)]

TOTAL DOMESTIC OHT CAPACITY = 33.3% of Requirement per day** = 0.333 x 1.2 x [With Sullage & Sewage Treatment Plant

B5, from Table 1e(2)]

TOTAL DOMESTIC OHT CAPACITY = 33.3% of Requirement per day** = 0.333 x 1.2 x [With Sullage Treatment Plant B5, from

Table 1e(2)]

TOTAL TREATED WATER OHT CAPACITY = 33.3% of Requirement per day = 0.333 x 1.2 x [With Sewage Treatment Plant B9 from

Table 1e(2)]

TOTAL TREATED WATER UGT CAPACITY = 66.7% of Requirement per day = 0.667 x 1.2 x [With Sewage Treatment Plant B9 from

Table 1e(2)]

TOTAL DOMESTIC UGT CAPACITY = 66.7% of 1.2 x Requirement per day** = 0.667 x 1.2 x [With Sullage & Sewage Treatment

Plant B5, from Table 1e(2)]

TOTAL DOMESTIC OHT CAPACITY = 33.3% of Requirement per day** = 0.333 x 1.2 x [With Sewage Treatment Plant B8, from

Table 1e(2)]

TOTAL DOMESTIC UGT CAPACITY = 66.7% of 1.2 x Requirement per day** = 0.667 x 1.2 x [Without Sewage/Sullage Treatment

Plant B1, from Table 1e(2)]

226

E

I

DOMESTIC AND TREATED WATER REQUIREMENT FOR NON RESIDENTIAL BUILDINGS (Ref: Part 9, Section 1, Table 1 of NBC 2016)

Normal

Fixtures

Water

Efficient

Fixtures *

Normal

Fixtures

Water

Efficient

Fixtures

*

Domestic #

Flushing

Domesti

c ##

Flushing

c1

c2

d = c/b

e

f

g (a)

g (b)

g ( c)

h (a)

h (b)

h ( c)

I (a) = e x g(a)

or g(b)

I (b) =

e x g( c)

j (a) = f x

h(a) or

h(b)

j (b) =

f x h( c)

A

0.00

0

0

0

5

3

10

120

72

60

0

0

0

0

0.00

0

0

0

5

3

10

260

156

60

0

0

0

0

B

0.00

0

0

0

10

6

5

25

15

20

0

0

0

0

0.00

0

0

0

10

6

5

90

54

45

0

0

0

0

0.00

0

0

0

10

6

5

90

54

45

0

0

0

0

C

0.00

0

0

0

5

3

10

230

138

110

0

0

0

0

0.00

0

0

0

5

3

10

300

180

150

0

0

0

0

0.00

0

0

0

10

6

5

25

15

20

0

0

0

0

D

0.00

0

0

0

4

2.4

6

25

15

20

0

0

0

0

0.00

0

0

0

4

2.4

6

25

15

20

0

0

0

0

0.00

0

0

0

5

3

10

25

15

20

0

0

0

0

0.00

0

0

0

55

33

15

25

15

20

0

0

0

0

0.00

0

0

0

25

15

10

25

15

20

0

0

0

0

E

0.00

0

0

0

5

3

10

25

15

20

0

0

0

0

F

Group F: Mercantile: (See Note 7a and 7

0.00

0

0

0

5

3

10

25

15

20

0

0

0

0

0.00

0

0

0

5

3

10

25

15

20

0

0

0

0

0.00

0

0

0

5

3

10

25

15

20

0

0

0

0

G

Group G: Industrial: (See Note 8a and 8b

0.00

0

0

0

5

3

10

30

18

15

0

0

0

0

0.00

0

0

0

5

3

10

20

12

10

0

0

0

0

H

0.00

0

0

0

5

3

10

25

15

20

0

0

0

0

I

0.00

0

0

0

0

0

0

0

J

0.00

0

0

0

40

24

30

25

15

20

0

0

0

0

0.00

0

0

0

40

24

30

25

15

20

0

0

0

0

0.00

0

0

0

30

18

15

25

15

20

0

0

0

0

0.00

0

0

0

25

15

20

25

15

20

0

0

0

0

0.00

0

0

0

15

9

10

25

15

20

0

0

0

0

0.00

0

0

0

25

15

20

25

15

20

0

0

0

0

0.00

0

0

0

10

6

5

25

15

20

0

0

0

0

0

0

0

0

A 1

A 2

A 3

A 4

0

Ltrs/day

0

Ltrs/day

0

Ltrs/day

* Water requirement per person per day considered using water efficient plumbing fixtures

# If Normal plumbing fixtures used consider g (a) and if Water Efficient plumbing fixtures used consider g (b)

## If Normal plumbing fixtures used consider h (a) and if Water Efficient plumbing fixtures used consider h (b)

NOTES AND REFERENCES:

1

7

2

3

8

4

9

10

5

11

6

II

OTHER WATER REQUIREMENT FOR NON RESIDENTIAL BUILDINGS

Domestic

Sullage

Treated

Treated

Domestic

Sullage

Treated

Treated

Total

1

Building Facilities/ Club House (See Note 1)

-

Persons

15

10

-

-

-

(a1)

-

-

Persons

25

20

-

-

-

(a2)

-

2

-

Litres

2%

-

-

(a3)

-

3

-

Litres

2%

-

-

(a4)

-

3

-

Sqmt

7

-

-

(a5)

-

Sqmt

5

-

-

(a6)

4

-

Litres

-

-

(a7)

5

-

Litres

-

-

(a8)

6

-

Sqmt

10

-

-

(a9)

-

7

-

Sqmt

5

-

-

(a10)

-

8

-

-

-

-

(a11)

-

-

-

-

-

(a12)

(a13)

(a14)

(a)

(a15)

WATER REQUIREMENT ASSESSMENT FOR NON-RESIDENTIAL BUILDINGS

TABLE-3a

Total Water Requirement / Day in Litres

Visitors/ floating

population

Owners/ Staffs

(e x g)

Domestic

Flushing

Domestic

Sl

No

TYPE OF OCCUPANCY

Occupant Load Factor (M 2/Person)

(Ref: Part 4,Table 3 of NBC 2016)

Gross Area

in Sqm (See

Note 1)

Seating

Capacity

(No. of

persons)

Total

Occupants

/No of

Persons

b) Hotel (4 Star and above)

(See Note 2a and 2b)

Group B: Educational:

a) Without boarding facilities

(See Note 3a and 3b)

Flushing

Water Requirement /Person /Day

for Owners & Staffs

a) No. of beds not exceeding 100 (See

Note 4a and 4b)

15

b) No. of beds exceeding 100 (See Note

4a and 4b)

15

c) Out patient department (OPD) (See

Note 4a and 4b)

10

b) With boarding facilities

(See Note 3a and 3b)

c) Hostels

(See Note 3a and 3b)

Group C: Institutional: Hospital:

(The water requirement includes

requirement of patients, attendants,

visitors and staff. Additional water

requirement for kitchen, laundry and

clinical water shall be computed as per

actual requirements)

a

b

Group A: Hotels: (Excluding laundry,

Kitchen, Staff and Water bodies) (See

Note 2)

a) Hotel (Upto 3 Star)

(See Note 2a and 2b)

Visitors/

floating

population

(See Table 3i)

Owners /

Staff

(See Table

3i)

Water Requirement /Person /Day for

Visitors & Floating population

c) Fixed seating (Cinemas, Concert halls

and Theaters and Multiplex)

1.2

d) Dining areas and restaurants with

seating and table (water requirement

including kitchen)

1.8

e) Food court (water requirement

including kitchen)

1.8

Group D: Assembly: (See Note 5a and

5b)

a) Concentrated use without fixed

seating

0.65

b) Less concentrated use without fixed

seating

1.4

b) Upper sales floor

6

c) Storage/warehouse, receiving and the

20

a) Factories including canteen where

bath rooms are required to be provided

10

Group E: Business: (including canteen)

(See Note 6a and 6b)

10

a) Street floor and sales basement

3

Traffic Terminal Stations (See Note 11)

a) Airports

(See Note 11a)

b) Railway station (Junction) with bathing

(See Note 11b)

b) Factories including canteen where no

bath rooms are required to be provided

10

Group H: Storage: (See Note 9a and 9b)

30

Group J: Hazardous (See note 10a and 10

10

f) Interstate Bus Terminals

(See Note 11f)

g) Interstate Bus Terminals/Metro Station

(See Note 11g)

c) Railway station (Junction) without bath

(See Note 11c)

d) Railway station (Intermediate) with bath

(See Note 11d)

e) Railway station (Intermediate) without b

(See Note 11e)

Total Domestic Water Requirement (DWS) (A1+A3)

Total Flushing Water Requirement (FWS) (A2+A4)

TOTAL

TOTAL - A

Hotels:

b. Water Requirement : Street floor and sales basement/Shopping and retail (Mall)

a. Occupant Load is considered Number of Beds + Staff + Requirement of restaurant seats (Ref: Part 9, Section 1, Clause -4.1.b of NBC 2016)

i) Staffs -Domestic 25 lphd and Flushing 20 lphd (Ref: Part 9, Section 1, Table 1, Sl No: xiv.a of NBC 2016)

b. Upto 3 Star - Domestic 120 lphd and Flushing 60 lphd (Ref: Part 9, Section 1, Table 1, (Clause 4.1.2) Sl No. vi of NBC 2016)

4 star and above - Domestic 260 lphd and Flushing 60 lphd (Ref: Part 9, Section 1, Table 1, (Clause 4.1.2) Sl No. vii of NBC 2016)

ii) Visitors -Domestic 5 lphd and Flushing 10 lphd (Ref: Part 9, Section 1, Table 1, Sl No: xiv.b of NBC 2016)

Total Water Requirement (DWS+FWS) (A=A1+A2+A3+A4)

Gross Area - The area of the floor within the inside perimeter of the outside walls of the floor of the building under consideration with no deduction for

corridors and passages, toilets, internal walls, internal columns or other features for each occupancy. In case the common passages are shared for different

uses, then proportionate area of such common passages shall be added to the plinth area of all the premises of the respective use.

Mercantile:

a. Occupant Load:

i) Street floor and sales basement - 3.00 SqM per person (Ref: Part 4, Table 3, Sl No: v.a of NBC 2016)

ii) Upper sales floor - 6.00 SqM per person (Ref: Part 4, Table 3, Sl No: v.b of NBC 2016)

iii) Storage/warehouse, receiving and the like - 20.00 SqM per person (Ref: Part 4, Table 3, Sl No: v.c of NBC 2016)

ii) With boarding facilities - Domestic 90 lphd and Flushing 45 lphd (Ref: Part 9, Section 1, Table 1, (Clause 4.1.2) Sl No. xiii.b of NBC 2016)

ii) Factories including canteen where no bath rooms are required to be provided -Domestic 20 lphd and Flushing 10

lphd (Ref: Part 9, Section 1, Table 1, Sl No: ii of NBC 2016)

Institutional/ Hospital:

iii) Water requirement should be assessed on a case to case basis.

a. Occupant Load:

Storage

Educational:

Industrial

a. Occupant Load:

ii) Schools Occupant Load - Strength of school + Teaching and non-teaching staff (Ref: Part 9, Section 1, Clause 4.1.b of NBC 2016)

iii) Hostel Occupant Load - Number of beds + 4.5 x (warden's residence) + staff (Ref: Part 9, Section 1, Clause 4.1.b of NBC 2016)

a. Occupant Load - 10.00 SqM per person (Ref: Part 4, Table 3, Sl No: vii of NBC 2016)

b. Water Requirement

b. Water Requirement

i) Without boarding facilities - Domestic 25 lphd and Flushing 20 lphd (Ref: Part 9, Section 1, Table 1, (Clause 4.1.2) Sl No. xiii.a of NBC 2016)

i) Factories including canteen where bath rooms are required to be provided -Domestic 30 lphd and Flushing 15 lphd

(Ref: Part 9, Section 1, Table 1, Sl No: i of NBC 2016)

ii. Number of beds exceeding 100 - Domestic 300 lphd and Flushing 150 lphd (Ref: Part 9, Section 1, Table 1 (Clause 4.1.2),

Sl No. iii.b of NBC 2016)

Hazardous

iii. Out patient department (OPD) - Domestic 10 lphd and Flushing 5 lphd (Ref: Part 9, Section 1, Table 1 (Clause 4.1.2), Sl No. iii.c of NBC 2016)

a. Occupant Load - 10.00 SqM per person (Ref: Part 4, Table 3, Sl No: ix of NBC 2016)

Assembly:

b. Water Requirement should be assessed on a case to case basis.

i. Indoor patients area is 15.0 SqM per person (Ref: Part 4, Table 3, Sl No: iii.a of NBC 2016)

a. Occupant Load - 30.00 SqM per person (Ref: Part 4, Table 3, Sl No: viii of NBC 2016)

Car parking area under occupancy other than storage shall also be 30.00 SqM per person (Ref: Part 4, Table 3, Sl No:

viii, (see Note 5) of NBC 2016)

ii. Outdoor patients area is 10.0 SqM per person (Ref: Part 4, Table 3, Sl No: iii.b of NBC 2016)

b. Water Requirement :

i. Number of beds not exceeding 100 - Domestic 230 lphd and Flushing 110 lphd (Ref: Part 9, Section 1, Table 1 (Clause 4.1.2), Sl No. iii.a of NBC 2016)

b. Water Requirement -Domestic 25 lphd and Flushing 20 lphd (Ref: Part 9, Section 1, Table 1, Sl No: viii of NBC 2016)

b) Railway station (Junction) with bathing facility -Domestic 40 lphd and Flushing 30 lphd (Ref: Part 9, Section 1, Table

1, Sl No: xv.b of NBC 2016)

a. Occupant Load:

i. Concentrated use without fixed seating area is 0.65 SqM per person (Ref: Part 4, Table 3, Sl No: vi.a of NBC 2016)

Traffic terminal stations

ii. Less concentrated use without fixed seating is 1.40 SqM per person (Ref: Part 4, Table 3, Sl No: vi.b of NBC 2016)

Occupant Load - The number of persons shall be determined by average number of passengers handled by stations,

with due considerations given to the staff and vendors who are using these facilities. Consideration should be given for

seasonal average peak requirements. (Ref: Part 9, Table 1, Notes 3 and 4 of NBC 2016)

iii. Fixed Seating - In case of assembly occupancy having fixed seats, the occupant load shall be determined by multiplying the number of seats by 1.2 (Ref: Part

4, Table 3, Sl No: vi.c (see note 4) of NBC 2016)

iv. Dining areas and restaurants with seating and table is 1.80 SqM per person (Ref: Part 4, Table 3, Sl No: vi.d of NBC 2016)

Sl No

PURPOSE

QUANTITY

UNIT

Water Requirement (Liters/ Day/ Unit)

Business: (Offices -including canteen)

f) Interstate Bus Terminals -Domestic 25 lphd and Flushing 20 lphd (Ref: Part 9, Section 1, Table 1, Sl No: xv.f of NBC

a. Occupant Load - 10.00 SqM per person (Ref: Part 4, Table 3, Sl No: vi of NBC 2016)

g) Interstate Bus Terminals/Metro Stations -Domestic 10 lphd and Flushing 5 lphd (Ref: Part 9, Section 1, Table 1, Sl

No: xv.g of NBC 2016)

b. Water Requirement -Domestic 25 lphd and Flushing 20 lphd (Ref: Part 9, Section 1, Table 1, Sl No: viii of NBC 2016)

Sullage

Genaration Remarks

Notation

TABLE-3b

b) Gym along with Jacuzzi, Steam,

Sauna, Ayurvedic therapy, etc

Pool make up - Swimming Pool (See Note

2)

Landscape

a) Gym

OCCUPANT ASSESSMENT & WATER REQUIREMENT FOR NON RESIDENTIAL BUILDINGS

Mall Cleaning (Common area) (See Note

6b)

Other requirements

i. Concentrated use without fixed seating area/Stadium - Domestic 4 lphd and Flushing 6 lphd (Ref: Part 9, Section 1, Table 1, Sl No: xi of NBC 2016)

TABLE - 3

Other Water Bodies (Fish Pond, Water

Fountains, etc.)

Total Water Requirement (Liters/ Day/ Unit)

TOTAL (B)

DG Set Cooling Tower (See Note 4)

Market Cleaning (Common area and stall

area) (See Note 6a)

a) Lawns (See Note 4a)

b) Other Landscape -Shrubs and Trees

(See Note 4b)

HVAC Cooling Tower (See Note 4)

iii. Fixed Seating (Cinemas, concert halls and theaters and multiflex) - Domestic 5 lphd and Flushing 10 lphd (Ref: Part 9, Section 1, Table 1, Sl No: xii of NBC

2016)

c) Railway station (Junction) without bathing facility -Domestic 30 lphd and Flushing 15 lphd (Ref: Part 9, Section 1,

Table 1, Sl No: xv.c of NBC 2016)

iv. Restaurants (water requirement including kitchen) - Domestic 55 lphd and Flushing 15 lphd (Ref: Part 9, Section 1, Table 1, Sl No: ix.a of NBC 2016)

d) Railway station (Intermediate) with bathing facility -Domestic 25 lphd and Flushing 20 lphd (Ref: Part 9, Section 1,

Table 1, Sl No: xv.d of NBC 2016)

v. Food Court (water requirement including kitchen) - Domestic 25 lphd and Flushing 10 lphd (Ref: Part 9, Section 1, Table 1, Sl No: ix.b of NBC 2016)

e) Railway station (Intermediate) without bathing facility -Domestic 15 lphd and Flushing 10 lphd (Ref: Part 9, Section

1, Table 1, Sl No: xv.e of NBC 2016)

b. Water Requirement :

Water Requirement:

a) Airports -Domestic 40 lphd and Flushing 30 lphd (Ref: Part 9, Section 1, Table 1, Sl No: xv.a of NBC 2016)

ii. Less concentrated use without fixed seating/Stadium - Domestic 4 lphd and Flushing 6 lphd (Ref: Part 9, Section 1, Table 1, Sl No: xi of NBC 2016)

227

NOTES AND REFERENCES:

1

Water Requirement

i. Clubhouse (Gym, Jacuzzi, Steam, Sauna, Ayurvedic therapy, etc.)- Domestic -25 lphd and Flushing 20 lphd (Ref: Part 9, Section 1, Table 1, Sl No: x of NBC 2016)

ii. Gym - Domestic -15 lphd and Flushing 10 lphd considered.

2

3

4

5

6

a) Non Veg and Veg Market Cleaning water shall be considered as 10 Liters per Sqm of Market area (10 liters x Area = Liters/day)

b) Mall Cleaning water shall be considered as 5 Liters per Sqm of Common area of the mall (5 liters x Area = Liters/day)

III

Total Water requirement (Litres)

(B = A + a)

-

Litres

Waste Water Generation (Litres)

Grey water

(B1 = A1+A3+a15)

-

Litres

Black Water

(B2 = A2+A4+a1+a2)

-

Litres

Total Waste Water

(B3 = B1+B2)

-

Litres

Water Usage if Sullage Treatment Plant (Litres)

Domestic

(B4 = A1+A3+a12)

-

Litres

Treated Sullage

(B5 = A2+A4+a13+a14)

-

Litres

Treated water disposal

(B5(1) = (B1x95%)-(B5)

-

Litres

Water Usage if Sewage Treatment Plant (Litres)

Domestic

(B6 = A1+A3+a12+a13)

-

Litres

Treated Sewage

(B7 = A2+A4+a14)

-

Litres

Treated water disposal

(B7(1) = (B3x90%)-(B7)

-

Litres

IV

Sl

No

UG Static water

storage tank #

Terrace

Tank #

Remarks

A

a)

1)

i)

NR

5000

(see note 1)

ii)

NR

5000

(5000)

(see note 2)

iii)

NR

10000

(5000)

(see note 2)

b)

1)

i)

NR

5000

(5000)

(see note 6)

ii)

10000 for every

500 Sqm floor

area subject to

minimum of

50000

(See Note 7)

10000

(5000)

(see note 6)

iii)

100000

(see Note 8)

10000

(See Note 4)

2)

150000

20000

3)

200000

20000

c)

250000

20000

B

1)

i)

NR

10000

(5000)

(see note 6)

2)

NR

25000

3)

50000

5000

(see note 6)

C

a)

1)

i)

NR

5000

(see note 6)

ii)

NR

5000

(5000)

(see note 6)

iii)

NR

10000

(5000)

(see note 6)

iv)

75000

10000

2)

100000

10000

3)

150000

20000

4)

200000

20000

b)

1)

i)

NR

10000

(5000)

(see note 6)

ii)

NR

15000

(5000)

(see note 6)

2)

100000

5000

(5000)

(see note 6)

3)

150000

10000

4)

200000

20000

D

a)

1)

i)

NR

20000

(5000)

(see note 6)

ii)

NR

25000

(5000)

(see note 6)

2)

100000

5000

(5000)

(see note 6)

3)

150000

10000

4)

200000

20000

b)

200000

20000

c)

E

1)

NR

10000

(5000)

(see note 6)

2)

50000

5000

(5000)

(see note 6)

3)

100000

10000

4)

150000

20000

5)

200000

20000

F

a)

1)

i)

NR

5000

(5000)

(see note 6)

ii)

NR

20000

(5000)

(see note 6)

iii)

NR

25000

(5000)

(see note 6)

2)

100000

10000

3)

200000

20000

b)

150000

10000

G

a)

i)

NR

5000

(see note 5)

ii)

NR

20000

(5000)

(see note 6)

iii)

NR

20000

(5000)

(see note 6)

iv)

75000

5000

(see note 6)

b)

i)

NR

10000

ii)

NR

20000

iii)

NR

50000

iv)

100000

10000

v)

150000

10000

c)

i)

NR

10000

ii)

NR

25000

iii)

50000

10000

iv)

100000

20000

v)

150000

20000

H

1)

NR

25000

2)

i)

50000

10000

ii)

75000

10000

iii)

100000

10000

3)

150000

10000

J

1)

i)

Minimum 240

min Fire fighting

requirments

NR

ii)

Minimum 240

min Fire fighting

requirments

50000

WATER REQUIREMENT, WASTE WATER GENERATION, TREATED WATER USAGE & SEWAGE/EXCESS TREATED

WATER DISPOSAL FOR RESIDENTIAL BUILDINGS

TABLE-3c

STORAGE OF WATER FOR FIRE FIGHTING PURPOSES

(UPTO 21 Mtrs BUILDING HEIGHT, NO FIRE SERVICES REQUIRED AS PER THE KARNATAKA FIRE FORCE

(AMMENDMENT) ACT 2023, DATED 27-07-2023)

MINIMUM REQUIREMENTS OF UGT & OHT FOR FIRE FIGHTING

Upto 15m in height

Single storey building

more than one floor building but not exceeding 15m

Storage Buildings

Hazardous Buildings

More than Ground plus one floor

Multilevel car parking (MLCP)

Covered area upto 50 Sqm

Covered area more than 50Sqm and upto 150 Sqm

Covered area more than 150Sqm and upto 300Sqm

Covered area more than 300Sqm and upto 500Sqm

Covered area more than 5000Sqm

Below 15m in height and Covered area less than 250Sqm

Below 15m in height and Covered area more than 250Sqm

Ground Floor only

Ground plus one floor

Ground plus one storey and total of all floor area exceeding

500Sqm

More than Ground plus one storey

above 15m and but not exceeding 24m in Height

above 24m and but not exceeding 30m in Height

Underground shopping complex

Industrial Buildings

Low Hazard (See note 10)

Moderate Hazard (see note 10)

High Hazard (see note 11)

Covered area upto 100 Sqm

Covered area more than 100Sqm and upto 500 Sqm

Covered area more than 500Sqm (For building height upto

15m)

Covered area more than 500Sqm (For building height above

Covered area upto 100 Sqm

Covered area more than 100Sqm and upto 500 Sqm

Covered area more than 500Sqm and upto 1000Sqm (For

building height upto 15m)

Covered area more than 1000Sqm (For building height above

15m)

Covered area more than 1000Sqm

Less than 10m in height

above 10m and but not exceeding 15m in Height

above 15m and but not exceeding 24m in Height

above 24m and but not exceeding 30m in Height

above 30m in height

Mercantile Buildings

F-1 & F-2 (See Note 9)

Less than 15m in height

Ground plus one storey, with total of all floor area not

exceeding 500Sqm

Less than 10m in height

Upto 300 person

More than 300 person

above 10m and but not exceeding 15m in Height

above 15m and but not exceeding 24m in Height

above 24m and but not exceeding 30m in Height

D-6*

D-7* (Refer Clause no 6.4.4 of Part 4, NBC 2016)

Business Buildings

Custodial, Penal & Mental

Less than 10m in height

Upto 300 person

More than 300 person

10m and above but not exceeding 15m in Height

15m and above but not exceeding 24m in height

24m above but not exceeding 30m in height

Assembly Buildings

Buildings D-1 to D-5*

Hospitals, Sanatoria and nursing homes

Less than 15m in height with Plot area upto 1000Sqm

Upto Ground plus one storey, with no beds

Upto Ground plus one storey, with beds

Ground plus two or more storeys, with no beds

Ground plus two or more storeys, with beds

Less than 15m in height with Plot area more than 1000Sqm

15m and above but not exceeding 24m in Height

above 24m but not exceeding 45m in height

15m and above but not exceeding 30m

above 30m in height

Hotels (A-6)

Less than 15m in height

Ground plus one or more storeys

15m and above but not exceeding 24m in Height

above 24m but not exceeding 30m in height

Educational Buildings

Institutional Buildings

TABLE-3d(1)

Floor area exceeding 1000Sqm on any of the Floor

More than 15 and upto 30 rooms

More than 30 rooms

Water consumption for cooling towers shall be considered as per the manufacturers requirement and also consider the daily running hours of the systems.

Water consumption for Ice Plant shall be considered as per the manufacturers requirement and also consider the daily running hours of the systems.

Type of Building Occupnacy

Residential Buildings

Lodging and Rooming Houses (A-1) (See note 3)

Less than 15m in height

Upto 15 rooms

Population of 15 percent shall be considered for likely to use the building facilities.

Pool Make up, Fish pond, Water fountain, etc considered 2% of Total volume of stored water.

The water requirement for landscaping purposes is generally taken as 6 to 8 Litre/SqM/day for lawns. For shrubs and trees the above value can be reduced considerably. (Ref: Part 9,

Section 1, Clause 4.1.5.2 of NBC 2016).

a) For Lawns 7 Litre/SqM/day shall be considered.

b) For Other Landscapes like Shrubs and Trees 5 Litre/SqM/day shall be considered.

Hotels (A-5)

Less than 15m in height

Floor area not exceeding 300Sqm on any of the Floor

Floor area exceeding 300Sqm but not more than 1000 Sqm

on any of the Floor

228

i)

-

Mtrs

ii)

Ltrs (C1)

Ltrs (C2)

-

Lts (C3=C1+C2)

iii)

Lts (C4)

NOTES AND REFERENCES:

#

*

**

(No of nozzles in largest compartment perimetre = (Largest compartment perimeter /3.0m +1 Nos & Flow rate per nozzle = 33 LPM)

1

2 Automatic detection and alarm system is not required to be provided in car parking area. Such detection system shall however be required in other areas of car parking such as electrical rooms, cabins and other areas.

3 Buildings above 15 m in height are not to be permitted for occupancies A-I and A-2.

4 Required to be installed in basement, if area of basement exceeds 200 Sqm.

5 Required to be provided if basement area exceeds 200 Sqm.

6 Additional value given in peranthesis shall be added if basement area exceeds 200 Sqm

7 Required to be provided for blrildings with more than two storeys (Ground + One).

8 Required to be provided for blrildings with more than one storey.

9 Buildings above 30 m in height not to be permitted for Group B, Group C, Group D and Group F occupancies.

10 Buildings above 18 m in height not to be permitted for G-l and G-2 occupancies.

11 Buildings above 15 m in height not to be permitted for G-3 occupancies.

1

2

V

SEPTIC TANK / SULLAGE TREATMENT PLANT/ SEWAGE TREATMENT PLANT CAPACITY (The recycled water should be used for Toilet Flushing, Cleaning and Landscape Irrigation purposes)

1 BUILDINGS WHERE UGD IS AVAILABLE

2 BUILDINGS WHERE UGD IS NOT AVAILABLE

a) Capacity of 100% SuTP

Total Sullage generated (D1 = B1 from Table 3c)

-

Lts/day

Add 20% extra capacity for contingencies (D2 = D1 +20%)

-

Lts/day

Required SuTP Capacity (D3 = D2/1000)

-

KLD

b) For Large Buildings

Recommended SuTP Capacity (Round off in multiples of 5KLD) (D4)

KLD

i Capacity of 100% SuTP & 100% STP

Required SuTP Capacity (D3)

-

KLD

b) Capacity of 100% SuTP & STP for additional treated water required

Recommended SuTP Capacity (Round off in multiples of 5KLD) (D4)

KLD

Required SuTP Capacity (D3)

-

KLD

Total Black water generated (B2 from Table 3c) (D15)

-

Lts/day

Recommended SuTP Capacity (Round off in multiples of 5KLD) (D4)

KLD

Add 20% extra capacity for contingencies (D16 = D15 +20%)

-

Lts/day

Treated water generated from SuTP (D5 = D1 x 95%)

-

Lts/day

Required STP Capacity (D17 = D16/1000)

-

KLD

Total treated water required (D6 = B4 from Table 3c)

-

Lts/day

Recommended STP Capacity (Round off in multiples of 5KLD) (D18)

KLD

Shortfall of SuTP Treated water (D7 = D6-D5)

-

Lts/day

Add 20% extra capacity for contingencies (D8 = D7 +20%)

-

Lts/day

ii Capacity of 100% STP with RO Plant

(for the shortfall in treated water requirement to be treated in STP)

Total Sewage generated [B3 from Table 3c] (D19)

-

Lts/day

Required STP Capacity (D9 = D8/1000)

-

KLD

Add 20% extra capacity for contingencies (D20 =D19 +20%)

-

Lts/day

Recommended STP Capacity (Round off in multiples of 5KLD) (D10)

KLD

Required STP Capacity (D21 = D20/1000)

-

KLD

c) Capacity of 100% STP with RO Plant

Recommended STP Capacity (Round off in multiples of 5KLD) (D21)

KLD

Total Sewage generated [B3 from Table 3c] (D11)

-

KLD

Add 20% extra capacity for contingencies (D12 = D11 +20%)

-

Lts/day

Notes:

Required STP Capacity (D13 = D12/1000)

-

KLD

Recommended STP Capacity (Round off in multiples of 5KLD) (D14)

KLD

VI

CAPACITY OF RO PLANT FOR DRINKING WATER SUPPLY

i)

LPD

ii) Required RO Plant Capacity per hour (¼ th of the total drinking water requirement )** =

-

LPH

iii) Recommended RO plant capacity (Round off in multiples of 250 LPH)=

LPH

iv) RO Plant SS water storage tank capacity (Round off in multiples of 250 Lits) # =

-

Litres

RO PLANT SPECIFICATION

Sl.

No.

i)

ii)

iii)

iv)

v)

vi)

Notes:

* Drinking Water requirement as per requirment

**

# Storage tank capacity for 1 day's requirement

VII

1. CENTRALISED SOLAR HOT WATER SYSTEM WITH SOLAR THERMAL COLLECTORS

1)

=

Ltrs (E1)

2)

Add wastage of 5% (E2 = E1 + 5%)

=

-

Ltrs (E2)

3)

=

Ltrs (E3)

4)

SS Hot Water Storage Tank Capacity Required# [E4 = 80% of the Recommended Hot Water requirement (E3)]

=

-

Ltrs (E4)

# Assuming 80% of the people will take bath at the peak hour consumption of hot water from 6:30am to 8:30am.

5)

Recommended SS Hot Water Storage Tank Capacity [E5 = Rounded off value of (E4) in multiples of 125Lit]

=

Ltrs (E5)

6)

=

-

Nos (E6)

8)

=

-

SqM (E7)

2. CENTRALISED HOT WATER SYSTEM WITH HEAT PUMP

9)

=

-

Ltr/Hr (E8)

##

10)

=

T (E9)

11) Electrical Power Consumption of the Heat Pump (25% of the Rated output power, Refer ### )

=

kW (E10)

Standards for the selection of Heat Pump with Rated Output Power and Hot Water at the Temperature of 60◦C from the ambient Temp. of 25◦C =35◦C Delta T

###

VIII WATER TANK CAPACITY

1

DOMESTIC WATER TANK CAPACITY *

a)

-

Litres

~

Litres

(G1)

66.70%

100.00%

b)

-

Litres

~

Litres

(G2)

66.70%

100.00%

c)

-

Litres

~

Litres

(G3)

66.70%

100.00%

d)

-

Litres

~

Litres

(G4)

66.70%

100.00%

e) TOTAL FIRE FIGHTING UG TANK CAPACITY AS PER Table 3d(2) (C3)

-

Litres

~

Litres

(G5)

f)

-

Litres

~

Litres

(G6)

33.30%

16.67%

g)

-

Litres

Litres

(G7)

33.30%

16.67%

h)

-

Litres

~

Litres

(G8)

33.30%

16.67%

i)

-

Litres

~

Litres

(G9)

33.30%

16.67%

j) TOTAL FIRE FIGHTING OVERHEAD TANK CAPACITY AS PER Table 3d(2) (C4)

-

Litres

~

Litres

(G10)

2

TREATED WATER TANK CAPACITY *

a)

-

Litres

~

Litres

(H1)

66.70%

100.00%

b)

-

Litres

~

Litres

(H2)

66.70%

100.00%

c)

-

Litres

~

Litres

(H3)

33.30%

16.67%

d)

-

Litres

~

Litres

(H4)

33.30%

16.67%

3

-

Litres

~

Litres

(I)

NOTES & REFERENCES:

* General guide lines for calculation of capacity of these storage tanks are as follows (Ref: Part 9, Section 1, Clause 4.4.10 of NBC 2016)

a) ln case only OHT is provided, it maybe taken as 33.3 to 50 percent of 1.2 times of one day’s requirement;

b) In case only UGT is provided, it maybe taken as 50 to 150 percent of 1.2 times ofone day’s requirement; and

c) In case combined storage is provided, it maybe taken as 66.7 percent UGT and 33.3 percent OHT of 1.2 times of one day’s requirement.

** In case Hydropneumatic system used, it maybe taken as 100 percent for UGT of one day's requirement and 16.65 percent OHT of 1.2 times of one day's requirement.

TABLE-3d(2)

CENTRALISED HOT WATER SYSTEM WITH HEAT PUMP AND SOLAR THERMAL COLLECTORS FOR RESIDENTIAL BUILDINGS (TO

CALCULATE THE CAPACITY/SIZE OF THE SYSTEM)

TOTAL TREATED WATER OHT CAPACITY = 33.3% of Requirement per day = 0.333 x 1.2 x [With Sullage Treatment Plant B5 from Table 3C]

TOTAL TRAETED WATER OHT CAPACITY = 33.3% of Requirement per day = 0.333 x 1.2 x [With Sewage Treatment Plant B7 from Table 3C]

Recommended Hot Water requirement (E3 = Rounded off value of (E2) in multiples of 125Lit.)

2. Sullage/Sewage Treatment Plant or Septic tanks should be provided, if UGD system is not available for all Buildings

(Septic Tank shall be permitted for buildings upto 300 users) (Refer, IS : 2470 (part 1) -1985 for Design criteria and

Construction of Septic Tanks)

TABLE-3f(1)

Total Drinking water requirement (as per requirment)

TABLE-3f(2)

Description

Specifications

Capacity of Plant

Membrane Material & Size

One set of pumps shall be provided for each 100 hydrants or part thereof, with a maximum of two sets. In case of more than one pump set installation, both pump sets shall shall be interconnected at their delivery headers. (Refer Note 22, Table 7, Minimum

Requirements for Fire Fighting Installations Part 4 Fire and Life Safety of NBC 2016)

WATER TREATMENT PLANT TANK CAPACITY (If applicable)

TOTAL DOMESTIC UGT CAPACITY = 66.7% of 1.2 x Requirement per day** = 0.667 x 1.2 x [Without Sewage/Sullage Treatment Plant B,

from Table 3C]

TOTAL DOMESTIC UGT CAPACITY = 66.7% of 1.2 x Requirement per day** = 0.667 x 1.2 x [With Sullage Treatment Plant B4, from Table

3C]

TOTAL DOMESTIC UGT CAPACITY = 66.7% of 1.2 x Requirement per day** = 0.667 x 1.2 x [With Sullage & Sewage Treatment Plant B4,

from Table 3C]

TOTAL DOMESTIC UG TANK CAPACITY = 66.7% of 1.2 x Requirement per day** = 0.667 x 1.2 x [With Sewage Treatment Plant B6, from

Table 3C]

TOTAL DOMESTIC OHT CAPACITY = 33.3% of Requirement per day** = 0.333 x 1.2 x [Without Sewage/Sullage Treatment Plant B, from

Table 3C]

TOTAL DOMESTIC OHT CAPACITY = 33.3% of Requirement per day** = 0.333 x 1.2 x [With Sullage Treatment Plant B4, from Table 3C]

TOTAL DOMESTIC OHT CAPACITY = 33.3% of Requirement per day** = 0.333 x 1.2 x [With Sullage & Sewage Treatment Plant B4, from

Table 3C]

TOTAL DOMESTIC OHT CAPACITY = 33.3% of Requirement per day** = 0.333 x 1.2 x [With Sewage Treatment Plant B6, from Table 3C]

TOTAL TREATED WATER UGT CAPACITY = 66.7% of Requirement per day = 0.667 x 1.2 x [With Sullage Treatment Plant B5 from Table 3C]

Area Required for installing Solar Thermal Collectors (2 SqM required / 125 Litre Solar Thermal Collector

Panel (100Kg/Collector with water)) (E7= 2 SqM x E6)

Hot Water required per hour from Heat Pump (E8 = E4 / 7 Hours ##)

Hot Water supply gap 7 hours considered to fill the entire capacity of Hot water storage tank, assuming it is empty

at the night after consumption

Recommended Heat Pump Capacity (Refer ###)

1 T =3.3kW =81L/Hr, 1.5T =4.9kW =120L/Hr, 2 T =6.8kW =167L/Hr, 3 T =11.2kW =275L/Hr, 5 T =18.8kW =462L/Hr, 6 T =22kW =540L/Hr, 8 T =30kW =737L/Hr, 10 T

=38kW =934L/Hr, 12 T =44kW =1081L/Hr, 15 T =58kW =1425L/Hr, 20 T =75kW =1843L/Hr, 25 T =86kW =2113L/Hr. (1kW = 860Kcal is considered)

TABLE-3h

TABLE-3g

Total Hot water requirement (E1)

Number of 125 Lit. Solar Thermal Collectors (Size 1m x 2.0m)(E6 = E3 /125 = No. of Collectors)

TOTAL TREATED WATER UGT CAPACITY = 66.7% of Requirement per day = 0.667 x 1.2 x [With Sewage Treatment Plant B7 from Table 3C]

Water quality indicator

Controls system

Storage Tanks Capacity

Optional Components like Ultra Violet treatment, Ozonation, Micron Filters (0.2 Micron), pH Booster, Mineral

Booster, etc.

6hours/day of maximum running time of RO Plant considered (RO membrane shall be replaced every 2200 hours of running

(size of each membrane is 250LPH) ie. The life of membrane is 2200/6hrs =365days = 1 year)

Alternative to provisions of additional set of pumps, the objective can be met by providing additional diesel pump of the same capacity and doubling the water tank capacity as required for one set of pumps. (refer Note 23, Table 7, Minimum Requirements for Fire

Fighting Installations Part 4 Fire and Life Safety of NBC 2016 )

TABLE-3e

Septic tanks are only recommended for small communities and institutions whose contributory population does not exceed

300 (Refer: NBC 2016, Part 9, Section 2, Clause 4.5.14.5.2 Septic Tanks) or Sewage/Black Water generation is less than 15

KLD whichever is higher. Refer Design criteria and Construction of Septic Tanks (Ref: IS: 2470 (Part 1) – 1985)

1. Providing Sullage/Sewage Treatement Plant is a mandatory requirement for the residential buildings having Waste

water generation more that 35 KLD or 5000Sqm Builtup area.

Refer Table 7, Minimum Requirements for Fire Fighting Installations Part 4 Fire and Life Safety of NBC 2016

Water requirement for water curtain nozzles for 60 minutes considering the largest compartment's perimeter out of all compartments of car parking in any of

the basement. (Ref: Annex H (Clause 6.4.2.2. and 6.8.1.5), Clause H-4.c, Part 4 - Fire and life safety of NBC 2016)

Tank size required (Litres) = No. of nozzles (in the perimeter of the Largest compartment) x Flow rate per water curtain nozzle (LPM) x 60 Minutes.

Height of Building

UNDERGROUND TANK (SUMP TANK) CAPACITY

a) For Wet Riser, Yard Hydrant and Sprinklers per set of pumps [Refer Table

2c]

b) For Water Curtain (If applicable) **

TOTAL SUMP TANK CAPACITY =

OVERHEAD (TERRACE) TANK CAPACITY (Refer Table 2c)

MOEFA System shall also include talk-back system and public address system for the occupancies given in the table for (d) (I) (iii) under A-5, (a) (I) (iv) and (a) (2) under C-I, and (a) (2) under D-I to D-5, in all buildings 15 m and above in height, except for A-3 and

A-4 occupancies where these shall be provided for buildings of height 24 m and above. These shall also be provided in car parking areas more than 300 m2 and in multi-level car parking irrespective of their areas.

a) For Small Buildings

100% Sullage disposed into Leach Pit & 100% Sewage disposed into Septic Tank

D-1: Buildings having a theatrical or motion picture or any other stage and fixed seats for over 1000 persons

D-2: Buildings having a theatrical or motion picture or any other stage and fixed seats upto 1000 persons

D-3: Buildings without a permanent stage having accomodation for 300 or more persons but no permanent seating arrangement

D-4: Buildings without a permanent stage having accomodation for less than 300 persons with permanent seating arrangement

D-5: All other structures including temporary structures designed for assembly of people not coverved by subdivicion D-1 to D-4, at ground level

D-6: Buildings having mixed occupancies of Assembly & Merchantile(for example, Shopping Malls providing facilities such as shopping, cinema theatres,

multiplexes & restaurants / Food Courts.

D-7: Underground and elevated mass rapid transit system

229

TABLE-3i

(to Table 3a of Notification for Water Demand & Water Balance Chart)

Additional visitors / floating population for different uses shall be

TYPE OF OCUPANCY

Visitors/

floating

population

Owners /

Staff

Group A: Hotels:

a) Hotel (Upto 3 Star)

10%

90%

b) Hotel (4 Star and above)

10%

90%

Group B: Educational:

a) Without boarding facilities

5%

95%

b) With boarding facilities

5%

95%

c) Hostels

5%

95%

Group C: Institutional: Hospital:

a) No. of beds not exceeding 100

10%

90%

b) No. of beds exceeding 100

10%

90%

c) Out patient department (OPD)

85%

15%

Group D: Assembly:

a) Concentrated use without fixed seating

85%

15%

b) Less concentrated use without fixed seating

85%

15%

c) Fixed seating (Cinemas, Concert halls and Theatres and Multiplex)

85%

15%

d) Dining areas and restaurants with seating and table (water

requirement including kitchen)

85%

15%

e) Food court (water requirement including kitchen)

85%

15%

Group F: Mercantile:

a) Street floor and sales basement

90%

10%

b) Upper sales floor

90%

10%

c) Storage/warehouse, receiving and the like

10%

90%

Group E: Business: (including canteen)

10%

90%

Group G: Industrial:

a) Factories including canteen where bath rooms are required to be

provided

10%

90%

b) Factories including canteen where no bath rooms are required to be

provided

10%

90%

Group H: Storage:

10%

90%

Group J: Hazardous

10%

90%

Traffic Terminal Stations:

a) Airports

90%

10%

b) Railway station (Junction) with bathing facility

90%

10%

c) Railway station (Junction) without bathing facility

90%

10%

d) Railway station (Intermedite) with bathing facility

90%

10%

e) Railway station (Intermedite) without bathing facility

90%

10%

f) Interstate Bus Terminals

90%

10%

g) Interstate Bus Terminals/Metro Stations

90%

10%

Notes and References:

1. Polpulation of 5 to 15 percent, depending on the usage of building,

shall be considered for visitors and floating population likely to use the

building facilities. (Ref: Part 9, Section 1, Clause 4.1.b -Notes 2 of NBC

230

ANNEXURE-XVA

Design criteria and Construction of Septic Tanks (Ref: IS : 2470 (Part 1) – 1985)

1. SCOPE – This code lays down recommendations for the design, layout, construction and maintenance of septic

tanks. It is applicable to houses, flats, residential housing colonies, hostels and boarding schools where the number

of users does not exceed 300 persons.

2. TERMINOLOGY

3. DESIGN CONSIDERATIONS

3.3 Location of Septic Tank

3.3.1 Septic tank should be located at a place open to sky, as far away as possible from the exterior of the wall of

building and should not be located in swampy areas or areas prone to flooding. It should also be accessible for

cleaning.

3.4 Septic Tank Design

3.4.1 Sewage flow

3.4.1.1 The maximum flow to the tank is based on the number of plumbing fixtures discharging simultaneously. For

this purpose various sanitation facilities are equated in terms of fixtures units. Fixtures equivalents are given in

Table 1.

Note – Fixtures unit is a quantity in terms of which the load producing effect of different plumbing fixtures on the

plumbing system are expressed on some arbitrarily chosen scale. In the design of septic tank, it is taken as 9 litres

per minute.

TABLE 1

FIXTURE EQUIVALENT (Clause 3.4.1.1)

FACILITY

EQUIVALENT FIXTURE UNIT

Water closet

1

Bath

½

Wash basin/kitchen sink

½

Urinal (with auto flush)

1

Urinal (without auto flush)

½

Slop sink

1

Laboratory sink

2

Combination fixture

1

Shower bath

1

Bath tub

2

Drinking fountain

½

Ablution tap

½

Dish water

½

3.4.1.2 The estimated number of fixture units and the number of fixture units that contribute to the peak discharge

in small installations serving up to 20 persons, for residential housing colonies up to 300 persons and for hostels and

boarding schools are given in Tables 2 to 4

231

TABLE 2

ESTIMATED PEAK DISCHARGE FOR SMALL TANKS UPTO 20 USERS

NUMBER OF USERS

(1)

NUMBER OF FIXTURE

UNITS

(2)

PROBABLE NUMBER

OF FIXTURE UNITS

DISCHARGING

SIMULTANEOUSLY

(3)

PROBABLE PEAK

DISCHARGE 1pm

(4)

5

1

1

9

10

2

2

18

15

3

2

18

20

4

3

27

NOTE 1- Number of fixture units is based on the assumption that each house consisting of 5 persons may have one

WC which will discharge into septic tank.

NOTE 2 – Probable number of fixture units are based on 70 percent fixture units discharging simultaneously.

TABLE 3

ESTIMATED PEAK DISCHARGE FOR RESIDENTIAL COLONIES (Clause 3.4.1.2)

No. OF USERS

(1)

NUMBER OF

HOUSEHOLDS

(2)

NUMBER OF FIXTURE

UNITS (3)

PROBABLE PEAK

DISCHARGE 1pm

(4)

50

10

20

108

100

20

40

216

150

30

60

324

200

40

80

432

300

60

120

648

NOTE 1- Probable peak discharge is based on 60 percent fixtures units discharging simultaneously.

NOTE 2 – Each household consisting of 5 persons may have 1 WC, 1bath and 1 wash basin/ kitchen sink.

232

TABLE 4

ESTIMATED PEAK DISCHARGE FOR HOSTELS AND BOARDING SCHOOL (Clause 3.4.1.2)

No. OF USERS

(1)

W.C

(2)

BATH

(3)

WASH

BASIN /

KITCHEN

SINK

(4)

NO OF

FIXTURE

UNITS

(5)

PROBABLE PEAK

DISCHARGE 1pm

(6)

50

6

6

6

12

76

100

12

12

12

24

130

150

19

19

19

38

205

200

25

25

25

50

270

300

37

37

37

74

400

NOTE – Probable peak discharge is based on 70 percent of fixture units discharging simultaneously.

3.4.2 Sedimentation

3.4.2.1 The surface area of the tank required will be 0.92 m2 for every 10 litres per minute of peak flow rate at a

temperature of 25°C.

3.4.2.2 A minimum depth of sedimentation shall be 250 to 300mm.

3.4.3 Sludge Digestion

3.4.3.1 Per capita suspended solids entering the tank may be taken as 70g/day.

3.4.3.2 The capacity required for sludge digestion is 0.033 m3 per capita at 25°C.

3.4.3.3 Volume of digested sludge is normally 0.00021 m3 per capita per day.

3.4.4 Detention Time

3.4.4.4 Aseptic tank designed on the basis of 3.4.1, 3.4.2 and 3.4.3 provides a detention period of 24 to 48 hours

based on an average daily flow of sewage.

3.4.5 Dimensions of Septic Tank

3.4.5.1 Septic tank shall have minimum width of 750mm, minimum depth of one metre below water level and a

minimum liquid capacity of 1000 litres.

3.4.5.2 For rectangular septic tanks, the length of the tank shall be 2 to 4 times the width. Suitable sizes of septic

tanks are given in Appendix A

3.4.5.3 For circular tanks the minimum diameter shall not be less than 1.35m and operating depth shall not be less

than 1.0m

4. SEPTIC TANK CONSTRUCTION

4.1. Floor – It is essential that the floor of the tank be water tight and of adequate strength to resist earth movement

and to support the weight of the tank walls and contents.

4.1.1 The floor may be of cement concrete of minimum M 15 grade (see IS : 456) and a minimum slope of 1 : 10 may

be provided towards the sludge outlet to facilitate desludging.

4.2 Walls – The walls should be of such thickness as to provide adequate strength and watertightness.

233

4.2.1 Walls built out of brick should not be less than 200 mm thick and should be plastered to a minimum thickness

of 12 mm inside and outside with cement mortar not weaker than 1 : 3; where they are built out of the stone

masonary. They should have a minimum thickness of 370 mm.

5. SLUDGE WITHDRAWAL

5.1. Half yearly or yearly desludging of septic tank is lesirable. Small domestic tanks, for economic reasons, may be

cleaned at least once in 2 years provided the tank is not overloaded due to use by more than the number for which it

is designed.

NOTE - Frequent desludging inhibits the anaerobic action in the tank. Normally, the tanks are cleaned when the sum

of the depth of the scum and the sludge is observed to exceed half the depth of the tank.

5.2. A portion of sludge not less than 25 mm in depth should be left behind in the tank bottom which acts as the

seeding material for the fresh deposits.

5.3. The digested sludge should be withdrawn through a dip pipe of not less than 150 mm dia under a hydrostatic

pressure of at least 450 mm. The sludge pipe shall deliver the sludge to the sump and be provided with a delivery

valve to draw the sludge as required. Portable pumps may also be used for desludging in which case there will be no

need for sludge pipe or sludge pump. Manual handling of sludge should be avoided.

5.3.1. When removal of the sludge is carried out the scum in the first tank should not be disturbed more than

necessary, this scum is needed to ensure efficient operation.

5.4. Sludge from septic tanks may be delivered into covered pits or into a suitable vehicle for removal from the site.

Spreading of sludge on the ground in the vicinity should not be allowed.

6. COMMISSIONING OF SEPTIC TANK

6.1. The sewage system should be complete and ready for operation before connection is made to the building.

6.2. The tank should be filled with water to its outlet level before the sewage is left into the tank. It should,

preferably, be seeded with small quantities of well digested sludge obtained from septic tanks or sludge digestion

tanks. In absence of digested sludge a small quantity of decaying organic matter, such as digested cow dung may be

introduced.

( Clause 3.4.5.2 )

SIZES OF SEPTIC

TANK

A - 1. Recommended sizes of septic tanks for 20 users are given in Table 5.

TABLE 5 RECOMMENDED SIZES OF SPECIFIC TANK FOR 20 USERS

NO. OF USERS

LENGTH

BREADTH

LIQUID DEPTH

( CLEANING INTERVAL OF )

1 YEAR

2 YEAR

(1)

(2)

(3)

(4)

(5)

m

m

m

m

5

1.5

0.75

1.0

1.05

234

10

2.0

0.90

1.0

1.40

15

2.0

0.90

1.3

2.00

20

2.3

1.10

1.3

1.80

NOTE 1 - The capacities are recommended on the assumption that discharges from only WC will be treated in the

septic tank.

NOTE 2 - A provision of 300 mm should be made for free board.

NOTE 3 - The sizes of septic tank are based on certain assumptions (see 3.4), while choosing the size of septic tank

exact calculations shall be made.

* Code of practice for installation of septic tank : Part 2 Secondary treatment and disposal of septic tank effluent (

second revision ).

A - 2. Recommended sizes of septic tanks for housing colonies (up to 300 persons) and for hostels and boarding

schools are given in Table 6 and 7 respectively.

TABLE 6 RECOMMENDED SIZES OF SPECIFIC TANK FOR RESIDENTIAL COLONIES

NO. OF USERS

LENGTH

BREADTH

LIQUID DEPTH

( CLEANING INTERVAL OF )

1 YEAR

2 YEAR

(1)

(2)

(3)

(4)

(5)

m

m

m

m

50

5.0

2.0

1.0

1.24

100

7.5

2.65

1.0

1.24

150

10.0

3.0

1.0

1.24

200

12.0

3.3

1.0

1.24

300

15.0

4.0

1.0

1.24

235

NOTE 1 - A provision of 300 mm should be made for free board.

NOTE 2 - The sizes of septic tank are based on certain assumptions (see 3.4), while choosing the size of septic tank,

exact calculations shall be made.

NOTE 3 - For population over 100, the tank may be divided into independent parallel chambers for ease of

maintenance and cleaning.

TABLE 7 RECOMMENDED SIZES OF SPECIFIC TANK FOR HOSTELS AND BOARDING SCHOOLS

NO. OF USERS

LENGTH L

BREADTH B

LIQUID DEPTH

( CLEANING INTERVAL OF )

Once in 1 Year

Once in 2 Years

(1)

(2)

(3)

(4)

(5)

m

m

m

m

50

5.0

1.6

1.3

1.4

100

5.7

2.1

1.4

1.7

150

7.7

2.4

1.4

1.7

200

8.9

2.7

1.4

1.7

300

10.7

3.3

1.4

1.7

NOTE 1 - A provision of 300 mm should be made for free board.

NOTE 2 - The sizes of septic tank are based on certain assumptions (see 3.4), while choosing the size of septic tank,

exact calculations shall be made.

NOTE 3 - For population over 100, the tank may be divided into independent parallel chamber for ease of

maintenance and cleaning.

236

237

238

239

240

241

SECONDARY TREATMENT AND DISPOSAL OF SEPTIC TANK EFFLUENT (Ref: IS : 2470 (Part 2) – 1985)

4. METHODS OF TREATMENT AND DISPOSAL OF EFFLUENT

4.1 The following methods of disposal are described in this Code:

a)

Soil absorption system,

b)

Up flow anaerobic filters

4.2 Depending on the position of the subsoil water level, soil and subsoil -conditions, the recommended method of

disposal of the effluent is given in Table I.

TABLE I RECOMMENDED METHOD OF DISPOSAL

FOR SEPTIC TANK

EFFLUENT

(Clauses 4.2, 6.0 and 7.0)

POSITION OF THE

SOIL AND SUBSOIL CONDITION

SUBSOIL WATER

LEVEL FROM

Porus Soil with Percolation Rate

Dense and clays soil

with percolation rate

exceeding 60 min

GROUND LEVEL

Not exceeding 30 min

Exceeding 30 min

but not exceed-

ing 60 min

Within 1.8 m

Dispersion trench

Dispersion trench

Biological filter partly

located partly or

located partly or

or fully above ground

fully above

fully above

level with under-drains

ground level in

ground level in

or up flow anaerobic

a mound

a mound

filter and the effluent

led into a surface drain

or used for gardening

Below 1.8 m

Seepage pit or

Dispersion trench

Subsurface biological

dispersion trench

filter with under drains or

up flow anaerobic filter

and the effluent led into a

drain or used for

gardening

242

NOTE - Where the above mentioned methods are not feasible and where the effluent has to be discharged

into open drain it should be disinfected.

5.2Construction of the Soil Absorption System – Two types of soil absorption system have been covered:

a)

Seepage pit, and

b)

Dispersion trench.

5.2.1 Seepage Pit - The seepage pit may be of any suitable shape with the least cross-sectional dimension of 0.90

m and not less than 1.0 m in depth below the invert level of the inlet pipe. The pit may be lined with stone, brick or

concrete blocks with dry open joints which should be backed with at least 75 mm of clean coarse aggregate ( see Fig.

2A). The lining above the inlet level should be finished with mortar. In the case of large dimensions, the top portion

may be narrowed to reduce the size of the RCC cover slabs. Where no lining is used, especially near trees, the entire

pit should be filled with loose stones. A masonry ring may be constructed at the top of the pit to prevent damage by

flooding of the pit by surface run-off (see Fig. 2B ). The inlet pipe may be taken down to a depth of 0.90 m from the

top as an anti-mosquito measure. Illustrations of typical constructions of seepage pit are given in Fig. 2

TABLE 2 ALLOWABLE RATE OF EFFLUENT APPLICATIONS TO

SOIL ABSORPTION SYSTEM

(Clause 5.1)

PERCOLATION RATE

MAXIMUM RATE OF

Min

EFFLUENT APPLICATION

1/m'/day

1 or less

204

2

143

3

118

4

102

5

90

10

65

15

52

30

37

45

33

60

26

NOTE 1- The absorption areafor a dispersion trench is the trench bottom area.

NOTE 2- The absorption area for seepage pits is the effective side wail area, effective depth being measured

from 150 mm below invert level of inlet pipe to the bottom of the pit ( see Fig. 2 ).

NOTE 3-If the percolation rate exceeds 30 minutes, the soil is unsuitable for soak ways. If the percolation

rate exceeds 60 minutes, the soil is unsuitable for any soil absorption system.

243

5.2.2 Dispersion Trench -Dispersion trenches shall be 0.5 to 1'0 m deep and 0'3 to 1.0 m wide excavated to a slight

gradient and shall be provided with 150 to 250 mn of washed gravel or crushed stones. Open jointed pipes placed inside

the trench shall be made of unglazed earthen-ware clay or concrete and shall have minimum internal diameter of 75

to 100 mm. Each dispersion trench should not be longer than 30 m and trenches should not be placed closer than 2.0

m.

6. BIOLOGICAL FILTERS

6.0 Biological filters are suitable for treatment of septic tank effluent where the soil is relatively impervious (see Table

1 ), water logged areas or where limited land area is available. In a biological filter, the effluent from septic tank is

brought into contact with a suitable medium, the surfaces of which become coated with an organic film. The film

assimilates and oxidizes much of the polluting matter through the agency of micro-organisms. The biological filter

requires ample ventilation and an efficient system of under drains leading to an outlet.

6.1 Construction - The depth of medium should be 1 400 mm but never less than 900 mm. The medium should be

retained in position by walls of adequate trench. The filter should have a concrete floor, laid to falls with a system of

under drains laid on it and consisting of fiend drains half channels laid upside down and open jointed or special tiles

discharging to the outlet.

6.3 Filter Media -- The filter sand and gravel shall conform to IS: 8419 (Part 1)-1977*.

6.5 Volume of Filter - It is essential that the volume of filter medium provided is sufficient to allow for sewage flow

which occurs with small installations, such variation being more pronounced it the smaller number of persons are

served. For populations of up to 10 persons the volume should be 1 m3 of medium per head, of resident population

for 10 and up to 50 persons, 0.8 m3 and for over 50 and up to 300 persons, 0.6 m3.

If pumping of the septic tank effluent forms part of scheme, recirculation of final effluent to dilute the septic

tank effluent may be introduced to reduce the volume of the filter.

6.6 Treatment of Filter Effluent -- The filter effluent is either discharged into surface drain or evenly distributed

over a grass plot from the system of channels. Where the effluent is likely to contaminate the watercourse, the

effluent should be adequately disinfected.

7. UPFLOW ANAEROBIC FILTER

7.0 Up flow type of filters (reverse filter) operating under submerged conditions is a method for disposal of septic tank

effluents in areas where dense soil condition (see Table 1), high water table and limited availability of open land are

factors to be considered for successful disposal of effluents by secondary treatment. The septic tank effluent is

introduced from the bottom and the microbial growth is retained on the stone - media making possible higher loading

rates and efficient digestion. The capacity of the unit is 0.04 to 0'05 m= per capita or 1/3 to 112 the liquid capacity of

the septic tank it serves. BOD removals of 70 percent can be expected and the effluent is clear and -free from odour

and-nuisance. The flow sheets of the filter system are shown in Fig. 5.

7.1 Types - Up flow anaerobic filters are of the following types:

a)

Single chambered rectangular type,

b)

Double chambered rectangular type, and

c)

Circular type.

7.2 Construction Features - In an up flow filter, the tank effluent enters at the bottom through a system of under

drains, flows upwards through a layer of coarse material generally 0.6 to 1.2 m deep and is discharged over a weir

244

or trough at the top. The driving head in the filter, that is, the difference between the water level and the filter may

be as low as 25 to 150 mm during normal functioning.

7.2.1 Single Chambered Rectangular Type - In this type (Fig. 6) an up flow filter with a rectangular chamber is

constructed to treat the effluent from a normal domestic septic tank. The chamber is packed with coarse material

and the size of the packing media should be 20 mm. The medium rests on a perforated concrete false bottom slab.

The effluent from septic tank enters the bottom of the filter chamber through a 150 mm pipe and is distributed

upward through the media from a perforated slab at the bottom.

The vertical inlet is fitted with a tee at the bottom, one branch of which leads to the filter and the other

branch is kept plugged while the filter functions. The plug can be removed to facilitate emptying into an adjoining

chamber and cleaning the filter where required. The effluent from the top of the bed is allowed to escape over a V-

notch. The sill level is kept 150 mm above the top of the medium.

7.2.2 Double Chambered Rectangular Type - The filter consists of two interconnected compartments (Fig. 7). The

first chamber is filled to a depth of 0.55 m with 20 mm coarse medium. The second chamber is filled to a depth of

0.45 m with 20 mm size coarse aggregate. The septic tank effluent falls through a perforated tray over the medium

in the first compartment and enters the second compartment directly from the bottom. The effluent passes up

through the medium in the second chamber and escapes over a V-notch placed 75 mm above the top of the medium.

By this arrangement, the time of travel of the effluent through the filter is lengthened. The two chambers are each

fitted at the bottom with a 75mm galvanized iron pipe leading to an adjacent chamber. A valve in these pipes allows

the filters to be partly desludged into the collecting chamber.

7.2.3 Circular Filter – A circular filter 0.9m in dia may also be constructed. Medium of aggregate of uniform size

20mm should be packed to rest on a perforated concrete slab. The effluent may be made to escape over the top of the

medium through equally placed notches along the periphery of the filter. The sill level is usually 100mm above the

top of the medium.

245

246

247

248

APPENDIX-XVI

(see clause 9.12)

PROVISION FOR DIFFERENTLY ABLED

1. Definitions

Ambulant Disabled People: Disabled who are able to walk but who may depend on prostheses (Artificial Limbs)

or those (Callipers), Sticks, crutches or walking aids.

Non-Ambulant Disabled People: Disabled people with impairments that confine them to wheelchair.

Wheel Chair: Chair used by disabled people for mobility.

i.

Size of small wheel chair: 750 x 1050 mm

ii.

Size of large wheel chair: 800 x 1500 mm

2. Scope

These Byelaws are applicable to public buildings and exclude domestic buildings.

Building which shall provide access to ambulant disable and Non-Ambulant disabled are listed below.

Distinction is made for buildings to be designed for the use of large wheel chairs and small wheel chair.

3. Building to be designed for Ambulant Disabled People Higher Secondary School, Conference Hall,

Dance Halls, Youth Centres, Youth Clubs, Sport Centres, Sport Pavilions, Boat Club Houses, Ice Rinks,

Bowling Centres, Swimming Pools, Police Stations, Law Courts, Courts Houses, Sport Stadiums,

Theatres, Concert Halls, Cinemas, Auditoria’s, Small Offices (the maximum plinth area 1400 sq.mt)

Snack Bars, Cafes and banqueting rooms (for capacity above 50 dinners).

Note:

i.

In sport stadiums provisions shall be made for non-ambulant spectators (small wheel chair)

ii) @ 1:1000 up to 10,000 spectators and @ 1:2000 for spectators above 10,000.

iii) In Theatres, Concert Halls, Cinemas and Auditoria provisions shall be made for non-ambulant spectators

(Small Wheel Chairs) @ 1/250 up to 1000 spectators and 1/500 for

spectators above 1000.

4. Building to be designed for Non-Ambulant Disabled People:

Schools for physically handicapped, cremation, buildings as mentioned in 3, Botanical Gardens, Religious

Buildings, Old People Clubs, Village Halls, Day Centres, Junior Training centres, Post Offices, Banks,

Dispensaries, Railway Stations, Shops, Super Markets, and Departmental Stores.

Notes: Large wheel chair criteria shall be applicable on ground floors of the following building, post offices, banks,

dispensaries, railway station, shops, supermarkets, and departmental stores

5. Building to be designed for Non-Ambulant People (using small wheel chairs) Public lavatories in Tourist

Sports, Clubs Motels, Professional and Scientific Institution, Museum, Art Galleries, Public Libraries,

Laboratories, Universities, Collage for further Education, Teachers Training Colleges, Technical

249

College, Exhibition Halls Dentist Surgeries, Administrative Department of the Hospitals, Service

Stations, Car Parking, Buildings Airports Terminals, Bus Terminals, Factories Employing Handicapped

for Sedentary Works, Large Offices, (with plinth area abode 1400 sq.mt.), Tax Offices, Passport Offices,

Pension Offices, and Labour Offices, Cafes, Banqueting Rooms and Snack Bars (For capacity above

100 dinners).

6. Buildings Requirements:

All Building requirements for building projects proposed under this category shall be conforming to

Annex D, Part 3 of NBC 2016

250

APPENDIX-XVII

(see clause 10(1))

CALCULATION FOR RAINWATER HARVESTING

RAIN WATER HARVESTING CALCULATION

DATE

SI

No.

Soil Type

Infiltration

rate cm/hr

1

High (Sandy soil)

1.25 - 2.54

2

Intermediate (Loam-clay-silt)

0.25 - 1.25

3

Low (clay-clay loam)

0.025 - 0.25

(Source:ASCE Manual of Engg. Practice No.28)

Rain water recharge pit calculation

Permeable factor=

m/hr

Diameter of the recharge pit =

1.5 m

Height of the recharge pit =

3 m

Area of percolation pit

a. Bottom (a) =

3.14 x (1.5/2) x (1.5/2) =

1.77 Sqm

b. Side wall (13)

3.14 x 1.5 x 3.0 =

14.13 Sqm

Total area of percolation = a + b

1.77+ 14.13 =

15.90 Sqm

Quantity of water percolation per hour

0.0125 x 15.90 =

Cum

Quantity of water percolation per day (c)

=

0.20 x 24 =

Cum

Storage capacity in recharge pit

Diameter of recharge pit =

1.5 m

Depth of storage

0.5 m

Storage capacity (d)

3.14 x (1.5/2)x (1.5/2) x 0.5 =

0.88 Cum

Total recharge per day per pit = c+ d =

0.88 Cum

Sump Tank capacity considered *

86 Cum

251

Sl.No

Area Type

Area

in

sqm

Normal rain

fall in mtr.

Year**

Runoff co-

efficient #

Total runoff

available in

cubic mtr/annum

Runoff at hourly

rainfall intensity of

40 mm/hour

1

Roof top

3.631

-

-

2

Roads

3.631

-

-

3

Paved area

3.631

-

-

4

Parks & Green

Belts

3.631

-

-

Total

Total recharge per

day per pit

No. of recharge pits

required.

Rounded off to

Nos

Notes

*

To be calculated as per 1 day's

requirement.

#

Runoff coefficient for various surfaces be taken from Table 10.1

Rain water available from roof top harvesting can be calculated as per Table 24 PART 9 Section 2 of NBC 2016 based

on the rain fall data. The capacity of the storage tank should be decided as per requirement in Chapter 15. Calculation

of storage tank dimension capacity can be referred from CPWD Rain water harvesting manual or any manual published

by competent Authority.

252

APPENDIX- XVIII

(see Table 11.2(4))

SOLID WASTE MANAGEMENT (SWM) IN BUILDINGS

ZERO WASTE CITY:

To achieve the concept of ‘Zero Waste City’, the principles of 3-Rs (Reduce-Reuse-Recycle) have to be adopted by all

responsible citizens in their lifestyle. Some of the measures that can be adopted by the citizens to achieve this concept

are;

1. Reuse bags and containers.

2. Reuse bottles, coffee mugs, plates, cutlery, storage containers, etc.

3. Skip on individually wrapped items, specifically food in snack packs or single serving containers (prepacked

salads, sandwiches, dressing, yoghurts, etc.)

4. Avoid single use items (plastic cutlery, straws, plates, cups, etc.)

5. Pay bills online.

6. Go paperless in kitchen.

7. Use own reusable grocery bags and shop locally.

8. Drink loose leaf tea.

9. Cook your own food.

10. Don’t waste food.

11. Prepare your meal plan to avoid wastage.

12. Go vegetarian / vegan, if possible.

13. Grow your own vegetables.

14. Join a vegetable box scheme.

15. Use Silicone Mats instead of Parchment Paper or foil.

16. User menstrual cups / cotton pads.

17. Reduce buying non-essential stuff.

18. Buy reduced items available at discounted rate (before it is thrown away by the supermarket).

19. Use more durable cloths instead of fast fashion cloths which you tend to discard soon.

20. Don’t replace electronic items just because new model has arrived, unless it is essential.

21. Say no to trends (new trend in fashion / gadgets / games etc.)

22. Repair items before buying new ones.

23. Make your own furniture, home decorations from waste materials.

24. Dispose your waste properly and don’t litter.

Other than the above-mentioned conscious changes in the lifestyle, the Municipal Solid Waste (MSW) generated in

buildings (generators) have to be treated at source (Insitu Treatment) to the extent possible, depending upon the type

of waste generated and the type of generator.

253

Additionally, the following guiding principle for solid waste management should be followed.

Solid Waste Management Planning Facilities that generate waste should categorize their waste according to

composition, source, types of wastes produced, generation rates, or according to local regulatory requirements. Effective

planning and implementation of waste management strategies should include

Review of new waste sources during planning, siting, and design activities, including during equipment modifications

and process alterations, to identify expected waste generation, pollution prevention opportunities, and necessary

treatment, storage, and disposal infrastructure. collection of data and information about the process and waste streams

in existing facilities, including characterization of waste streams by type, quantities, and potential use/disposition.

establishment of priorities based on a risk analysis that takes into account the potential environmental, health and

safety (EHS) risks during the waste cycle and the availability of infrastructure to manage the waste in an

environmentally sound manner. identify opportunities for at source reduction, as well as reuse and recycling detail

procedures and operational controls for onsite storage. definition of options/procedures/operational controls for

treatment and final disposal

Substituting raw materials or inputs with less hazardous or toxic materials, or with those where processing generates

lower waste volumes. Applying manufacturing process that convert materials efficiently, providing higher product

output yields, including modification of design of the production process, operating conditions, and process controls.

Instituting good housekeeping and operating practices, including inventory control to reduce the amount of waste

resulting from materials that are out-of-date, off specification, contaminated, damaged, or excess to

building/equipment/plant needs. Instituting procurement measures that recognize opportunities to return usable

materials such as containers and which prevents the over ordering of materials. Minimizing hazardous waste generation

by implementing stringent waste segregation to prevent the commingling of non-hazardous and hazardous waste to be

managed

Evaluation of waste production processes and identification of potentially recyclable materials. Identification and

recycling of products that can be reintroduced into the manufacturing process or industrial activity at the site.

Investigation of external markets for recycling by other industrial processing operations located in the neighbourhood

or region of the facility (for example, waste exchange).

COMPONENTS OF SWM:

The various components of Solid Waste Management (SWM) System in buildings are as follows;

1. Categorisation of buildings generating Municipal Solid Waste

2. Categorisation of Solid Waste generated in buildings

3. Quantification of Solid Waste in buildings

4. Primary Segregation of Waste at Source

5. Collection of Waste from apartments / premises

6. Secondary Segregation at Treatment Yard in buildings

7. Treatment of Waste

8. Use of Treated Waste

9. Disposal of Untreated Waste

10. Reports & Registers to be maintained

254

The detailed activities involved in the above components of SWM System are as follows;

I. Categorisation of Buildings Generating Municipal Solid Waste:

The quantity of solid waste generated varies for different types of buildings, based on the use of the building. In case of

mixed-use buildings, the area of each of the following uses are considered separately for implementing SWM system in

the building.

For the purpose of implementing SWM system in the building, the buildings are categorised into;

1. Residential {including apartment buildings)

a)

High Income Group (HIG)

b)

Middle Income Group (MIG)

c)

Low Income Group (LIG) & Economic Weaker Section (EWS)

2. Non-Residential

a)

Mercantile (Wholesale & Retail)

b)

Business (Offices)

c)

Hotels (excluding restaurant & kitchen area)

d)

Educational

e)

Assembly

f)

Restaurants / Fast food outlets

g)

Hospitals

h) Markets (including supermarkets and hypermarkets)

i)

Industrial (including storage & hazardous)

Note: the type and quantity of waste generated in Industrial building depends upon the type of industry and

hence SWM system to be adopted in Industrial buildings has to be assessed on a case-to-case basis and hence

not specified in these byelaws.

II. CATEGORISATION OF SOLID WASTE:

The Solid waste generated in the Units of the PROJECT (including residential apartment buildings) are categorised as

follows and the same shall be managed as specified herein;

1. Organic Waste

a)

Wet waste

e.g. Raw vegetable, meat & fish waste, Leftover cooked or uncooked food, Eggshells, Minced wheat or other

flour, Rotten rice, wheat and other grains, Coffee Powder, pet poop / waste & litter etc.

Note: pet poop / waste litter should be put in the WC and the litter can be put along with wet waste if the litter

used is biodegradable.

255

b)

Dry waste

i.

Combustible (non-recyclable / non-reusable with low calorific value). This is further sub divided into;

(a) Dry waste from Wet waste

e.g. Fruit peels (Orange, Lemon, pomegranate, Watermelon, pineapple etc.), Sugarcane husk, etc.

(b) Other Combustible Organic Dry Wastes.

e.g. curry leaf plant stem / coconut husk / coconut shell / used tender coconut husk / Used Tea

Bags / Paper cups, plates & spoons / Pieces of Waste paper and cartons / Pieces of Rags and

ropes / pieces of waste cloth / face mask / hair, etc.

ii.

Reusable/Recyclable waste

e.g. Carton boxes (wooden, cardboards, etc.) / Rags & Ropes / Papers (including newspapers) etc.

2. Inorganic Waste

a)

Dry waste

i.

Combustible (non-recyclable / non-reusable) waste with low calorific value

e.g., Food wrapping boxes and plastic foils / Composite paper items (including takeaway food packing

boxes), Dry food packets (e.g., of bread, biscuits, ready to eat items, without food items) etc.,

ii.

Combustible (non-recyclable / non-reusable) waste with high calorific value

e.g., RDF / Rubber (including worn out tyres) / Thermocol / Broken Plastic Carton Boxes / Foam

items, etc.

iii.

Reusable/Recyclable waste

e.g. Plastic items (including milk covers, water bottles & other bottles, Broken Stationery like pen,

pencil, eraser etc.) / Glass items (including broken glasses) / Broken or unusable utensils / Tin items

(including aluminum wraps) / PoP / Electric wires etc.

b)

Sanitary waste

e.g. Ladies, Children and Adult Napkins

c)

Biomedical waste

e.g. Bandages / Needles or syringes / medicines etc.

d) E-waste

e.g. CFL and tube lights / Computer and accessories waste (including printer cartridges) / Other electronic

items.

e)

Hazardous waste

e.g. Paints, batteries, solvents, cleaning agents, pesticides, waste oil (of generator) etc.

256

3. Inert Waste

e.g. Soil, sand, broken stones, waste mortar, hardened cement, etc.

4. Garden waste

Garden waste (branches & roots and leaves & flowers)

For segregation of Solid waste into different categories at source and storage Solid Waste Management Model bye

laws 2019 shall be followed.

III. QUANTIFICATION OF SOLID WASTE:

The estimated quantities of waste generated from various types of buildings are as follows;

1. Residential Buildings (including apartment buildings):

a)

Assumption made for Solid waste generated for Residential buildings (as per NBC 2016, Part 9, Section 3,

Solid Waste Management)

Per capita Solid waste generated (kg/person/day)

HIG

MIG

LIG & EWS

0.45 Kg

0.40 Kg

0.35 Kg

b)

The diversity in occupancy is also considered for assessing the quantity of waste generated in apartment

buildings as follows;

HIG

MIG

LIG & EWS

80%

90%

100%

c)

The estimated quantity of various types of wastes generated in residential buildings is provided in

Annexure-XVIII-A;

2. Non-Residential Buildings:

The estimated quantity of various types of wastes generated in Non-Residential buildings (except for Industrial

buildings) is provided in Annexure-XVIII-B

3. Garden Waste:

Garden waste is estimated to be 3 Kgs / Sqm of garden / landscape area per year, out of which 10% is

considered as branches & roots and 90% considered as leaves and flowers.

Garden waste per day = Landscape area in Sqm x 3 kg per Sqm per year / 365.

257

NBC 2016Part 9 Plumbing services, section 5, the following municipal refuse generation rates are

recommended:

a)

Residential refuse : 0.3 to 0.6 kg/capita/day

b)

Commercial refuse : 0.1 to 0.2 kg/capita/day

c)

Street sweepings

: 0.05 to 0.2 kg/capita/ day

d)

Institutional refuse : 0.05 to 0.2 kg/capita/ day

Out of the total solid waste generated, 40 percent may be taken as organic waste and 60 percent as inorganic

waste approximately. Estimation of waste generation based above table and diversity in occupancy is provided

in Annexure-XVIII-A & B.

IV. PRIMARY SEGREGATION OF WASTE AT SOURCE:

The waste generated in the building have to be segregated by the occupants of the residential apartments / commercial

premises / other buildings and the waste generated in the common areas and yard of the building should be segregated

by the concerned staff of the Building Management, as follows;

1. The wet waste [II(1)(a)] [including the dry waste from the wet waste – II(1)(b)(i)(a)] shall be kept in the designated

bin (without plastic cover).

2. All types of dry wastes {II(1)(b) [excluding II(1)(b)(i)(a)]& II(2)(a)} shall be kept in the designated bin (without

plastic cover).

3. Sanitary waste [II(2)(b)] shall be wrapped in paper.

4. Biomedical waste [II(2)(c)] shall be kept in plastic cover.

5. E-waste [II(2)(d)] shall be kept in plastic cover or stored separately.

6. Hazardous waste [II(2)(e)] shall be kept in plastic cover or stored separately.

7. Inert waste [II(3)] shall be kept in plastic cover.

8. Garden waste [II(4)] shall be segregated into leaves & flowers and branches & roots and kept in separate sacks

/ gunny bags.

Note: Premises mentioned in this document refers to premises in non-residential buildings such as retail shops,

offices, restaurants, etc.

V. COLLECTION OF WASTE:

1. Collection of Wet Waste –

The waste collection staff shall collect the wet waste [including the dry waste from the wet waste – [II(1)(b)(i)(a)]

every day from the residential apartments / non-residential premises (at prefixed time, preferably in the

morning and in case of markets and food outlets, both morning and evening). The occupant of the apartment

/ premises shall put the wet waste (from the bin kept in the apartment / premises) into the waste trolley

brought by the waste collection staff.

258

2. Collection of Dry Waste –

The waste collection staff shall collect the dry waste twice a week (or as preferred by the occupants) from the

apartments / premises. The occupant of the apartment / premises shall put the dry waste (from the bin kept

in the apartment / premises) into the waste trolley brought by the waste collection staff.

3. Collection of Sanitary Waste –

The Occupant of the apartment / premises shall deliver the Sanitary waste (wrapped in paper) to the waste

collection staff daily along with the wet waste. The Sanitary waste shall be placed in the designated plastic bag

tied to the waste trolley.

4. Collection of Biomedical Waste –

The Occupant of the apartment / premises shall deliver the Biomedical waste (placed in plastic cover) to the

waste collection staff at the time of delivering the dry waste. The Biomedical waste shall be placed in the

designated plastic bag tied to the waste trolley.

5. Collection of e-Waste –

a)

The Occupant of the apartment / premises shall deliver the e-waste (placed in plastic cover) to the waste

collection staff at the time of delivering the dry waste. The e-waste shall be placed in the designated plastic

bag tied to the waste trolley.

b)

The Occupant shall deliver large size e-waste to the waste treatment yard of the building (to place it in the

designated area).

6. Collection of Hazardous Waste –

The Occupant of the apartment / premises shall deliver the hazardous waste (placed in plastic cover or in

any suitable form) to the waste treatment yard of the building (to place it in the designated area).

7. Collection of Inert Waste –

The Occupant of the apartment / premises shall deliver the Inert waste (placed in plastic cover) to the waste

collection staff at the time of delivering the wet waste. The Inert waste shall be placed in the designated plastic

bag tied to the waste trolley.

8. Collection of Garden Waste –

The Gardner shall deliver the segregated garden waste (branches / roots and leaves / flowers) to the waste

treatment yard every day in sacks / gunny bags.

259

For collection of waste from apartment / premises general Refuse chute system is a convenient and safe mode

of transportation and collection of domestic solid wastes from buildings exceeding 5 storeys from floors at

different heights.

Notes:

1. The wet waste shall not be wrapped in plastic or any other cover while putting in the waste trolley. No other waste

shall be mixed with wet waste.

2. Wastes shall not be kept outside the apartment / premises even if the occupant is not available during the collection

time, to avoid foul smell and littering in the common corridors of the building.

3. If the occupant cannot deliver the wastes to the waste collection staff at the designated time or has any additional

waste to be delivered, he shall deliver the waste to the waste treatment yard of the building (place it in the designated

area).

4. For the buildings where insitu treatment of wet waste, dry waste and sanitary waste is not done, the respective wastes

shall be disposed to the decentralised / centralised treatment yard or handed over to the collection agency authorised by

the local authority, after segregation.

VI. SECONDARY SEGREGATION AT TREATMENT YARD

The secondary segregation is done at the treatment yard provided in the project and in the decentralised and centralised

treatment yards of the local authority.

1. Wet Waste Segregation

a)

The wet waste collected shall be dumped in the segregation tank of the treatment yard and rechecked for

any inorganic material or other types of wastes. Any such material / wastes found in the wet waste shall

be removed, cleaned and placed in the respective category of waste.

b)

The dry waste from wet waste specified in [II(1)(b)(i)(a)] shall be removed from the wet waste and placed in

the designated place (for incineration), after cleaning & drying.

c)

The wet waste shall be put in bins for use as animal feed (to be delivered to the respective agencies, if

required) and the balance wet waste shall be stored in bins for treatment.

2. Dry Waste Segregation

a)

The Dry waste collected shall be dumped in the designated sorting area of the treatment yard to segregate

the waste into Combustible Dry Waste of low calorific value [II(1)(b)(i), II(2)(a)(i) and II(4)], Dry Waste of

high calorific value [II(2)(a)(ii)] and Reusable / Recyclable Dry Waste [specified in II(1)(b)(ii) and II(2)(a)(iii)].

b)

All the incinerable wastes [II(1)(b)(i), II(2)(a)(i) and II(4)] shall be put in sacks / gunny bags and stored

separately in the treatment yard for incineration.

c)

The Reusable / Recyclable Dry Waste shall be put in sacks / gunny bags separately, based on the type of

waste and stored in the treatment yard, to be disposed to the recyclers.

3. Other Waste Segregation

260

All other wastes collected shall be checked to ascertain that the wastes are segregated as per the categories

mentioned above and stored separately and handed over to the agencies authorised by the local authority.

The segregation by manual or machinery, dry waste segregation MRF facility and other waste by authorised

vendors as notified by KSPCB or Government should be followed.

VII. TREATMENT OF WASTE

The following wastes are treated in the Insitu facility (of generators) or in the decentralised treatment yard or in the

centralised treatment yard;

1. Wet Waste [II(1)(a)]

2. Dry Waste [II(1)(b)(i) & II(2)(a)(i)(ii)]

3. Sanitary waste [II(2)(b)]

4. Garden waste [II(4)]

The above wastes are treated in the following manner;

1. Wet Waste [II(1)(a)] –

a)

It is preferred that wet waste is treated Insitu for all types and sizes of buildings.

b)

Buildings having total construction area above 5000.00 Sqm shall compulsorily have Insitu facility of

treatment of wet Waste.

c)

The various types of suggested treatments for wet waste are provided in Appendix-XVIII-A

2. Combustible Dry Waste of low calorific value [II(1)(b)(i) & II(2)(a)(i)]

a)

Non-Recyclable & Non-Reusable Dry Waste of low calorific value shall be permitted to be incinerated as per

the guidelines specified by CPCB.

b)

Buildings having total construction area above 50000.00 Sqm shall compulsorily install such incinerators

in the project.

c)

The requirements / specification of incinerators are provided in Appendix-XVIII-B

3. Combustible Dry Waste of high calorific value [II(2)(a)(ii)]

a)

Non-Recyclable & Non-Reusable Dry Waste of high calorific value shall be used for Pyrolysis Plants or any

other Waste to Energy (WtE) plants installed in the Centralised Treatment Plant.

4. Sanitary Waste [II(2)(b)] –

a)

The Sanitary Waste shall be permitted to be incinerated as per the guidelines specified by CPCB.

b)

Buildings having total construction area above 50000.00 Sqm shall compulsorily install such incinerators

in the project.

The treatment of waste should be carried out as per Karnataka Solid Waste Management Model Bye laws 2019 or as

notified by the competent Authority.

VIII. USE OF TREATED WASTE

261

The treated wet waste (after each cycle) shall be dried and sieved to be used as Manure. The Manure (generated in the

Project and in the decentralised / centralised treatment yard) shall be used for the gardens / landscape areas and the

excess manure may be sold to prospective purchasers and shall comply with SWM model bye laws, 2019 and IS 16556

2016 manure quality generation.

VIII. DISPOSAL OF WASTE

The wastes that are not treated Insitu or in the decentralised / centralised yards of the local authority shall be disposed

off as follows;

1. Reusable / Recyclable Dry Waste

The Reusable / Recyclable Dry Waste [specified in I(1)(b)(ii) and I(2)(a)(iii)] shall be disposed off to vendors

approved by the local authority.

2. Biomedical Waste, E-Waste and Hazardous Waste

These waste which are stored separately ( insitu or in the decentralised / centralised treatment yard) shall be

disposed off to the collection centres of the local authority periodically (depending upon the quantity of waste

generated).

3. Inert Waste

The inert waste shall be dumped in authorised landfill sites by the authorised transporters.

Note: The plastic covers shall be cleaned and stored separately in the treatment yard. The apartment / premises owners

can reuse these covers for storing the wastes.

All waste disposal must adhere to the Karnataka Municipalities Solid Waste Management Model Bye-Laws, 2019.

REPORTS TO BE GENERATED / REGISTERS TO BE MAINTAINED

The formats of all the reports to be generated / Registers to be maintained by the generators are provided as Annexure

-XVIII-E.

ASSESSMENT AND MANAGEMENT OF MSW FOR NEW BUILDINGS

1. The details of the new building shall be entered in the format provided as Annexure-XVIII-F1 (for residential

buildings) and Annexure-XVIII-F2 (for non-residential buildings) for assessing the quantity of MSW generated

in the building and for proposed management system of MSW.

a)

For Residential buildings (for each block, in case of multiple blocks in a project and for the residential

portion of the building in case of mixed-use building):

i.

The following general information of the Project to be entered in Table-1 of Annexure-XVIII-F1

●

Project Name

●

Address & Location of the project

●

Select Building category (HIG, MIG, LIG / EWS)

●

Diversity of Occupancy

ii.

The following details to be entered in Table-2 of Annexure-XVIII-F1

●

No. of dwelling units (for each type of dwelling units)

●

Landscape area provided in the project.

262

iii.

Based on the quantities of various types of wastes generated in the project as per Table-3 of

Annexure-XVIII-F1, propose the necessary treatments and disposal of wastes, as specified in

Appendix-XVIII-A, Appendix-XVIII-B and as per Clause VIII of this Appendix.

b)

For Non-Residential buildings (for each type of non-residential block, in case of multiple blocks in a

project and for the each type of non-residential portion of the building in case of mixed-use building):

i.

The following general information of the Project to be entered in Table-1 of Annexure-XVIII-F -

XVIII-F2

●

Project Name

●

Address & Location of the project

●

Building Use / Type of Building

●

Diversity of Occupancy

ii.

The following details to be entered in Table-2 of Annexure-XVIII-F2

●

Premises Area

●

Landscape area provided in the project.

iii.

Based on the quantities of various types of wastes generated in the project, as per Table-3 of

Annexure-XVIII-F2, propose the necessary treatments and disposal of wastes, as specified in

Appendix-XVIII-A , Appendix-XVIII-B and as per Clause VIII of this Appendix.

Quantity and characteristics of municipal solid waste - Dependable long-term data on quantity

and characteristics of Muncipal solid waste is essential for effective planning. The Local Authority

should chalk out a plan for quality and quantity check round the year, so that seasonal variations

are captured. This should be repeated once in 3 years. After the first year, data collection would

get streamlined and become easier for subsequent years.

263

From

wet

waste

(1.b.i.a)

Other

combust

ible

wastes

(1.b.i.b)

A

B

C

D

E

F

G

H

I

J

K

L

M

=A+B+C+D

+E+F

+G+H+I+J

+K+L

N = B + C+ E

O

P

Q = N + O

1

HIG

54.00% 6.00%

8.50%

9.00%

4.50%

3.00%

6.00% 6.25% 0.75% 0.25% 0.13%

1.62%

100.00%

19.00%

2

MIG

62.00% 5.00%

7.00%

7.00%

4.25%

2.50%

4.75% 5.00% 0.40% 0.10% 0.01%

1.99%

100.00%

16.25%

3

LIG & EWS

66.00% 4.00%

6.50%

6.50%

4.00%

2.00%

4.50% 4.00% 0.35% 0.05% 0.01%

2.09%

100.00%

14.50%

1

Organic Waste

1.a

1.b

Dry waste

1.b.i.a Form wet waste - Fruit peels (Orange, Lemon, pomegranate, Watermelon, pineapple etc.), Sugarcane husk, etc.

1.b.i.b

1.b.ii Dry waste - ( reusable/ recyclable ) -Carton boxes (wooden, cardboards, etc.) / Rags & Ropes / Papers (including newspaper) etc.

2

Inorganic Waste

2.a

Dry waste

2.a.i

2.a.ii

2.a.iii

2.b Sanitary Waste - Ladies, Children and Adult Napkins

2.c

Biomedical waste - Bandages, Needles or syringes, Medicines, etc.

2.d E-Waste - CFL and tube lights, Computer and accessories waste (including printer cartridges), Other electronic items

2.e Hazardous Waste - Paints, Batteries, Solvents, Cleaning agents, Pesticides, waste oil (of Generator), etc

3

Inert Waste - Soil, Sand, Broken stones, waste mortar, hardened cement, etc

4

Garden Waste

Garden waste considered 3kg per Sqm per Year, inwhich 10% considered as branches/ roots and 90% considered as leaves.

Garden waste per day (Landscape area x 3kg per Sqm per year / 365)

yclable/ non-reusable) - Curry leaf plant stem/ coconut husk/ coconut shell/ used tender coconut husk/ Used tea bags/ Paper cups, plates & spoons/ Pieces of waste paper and cartons/ P

Wet Waste - Raw vegetable, Meat & Fish waste, Leftover cooked or uncooked food, Eggshells, Minced wheat or other flour, Rotten rice, wheat and other grains, Coffee

powder, pet poop/waste & litter, etc.

Total

Combust

ible Dry

Waste

including

garden

waste

ANNEXURE - VIIIA

(Combustible)

Dry Waste (1.b)

(Reusabl

e /

Recyclab

le)

(1.b.ii)

Dry Waste (2.a)

Reusabl

e /

Recycla

ble

waste

(2.a.iii)

Combustible

(non-

recyclable/no

n-reusable)

waste with

High calorific

Combustible

(non-

recyclable/no

n-reusable)

waste with

Low calorific

Branche

s /roots Leaves

Sl No

ESTIMATED QUANTITY OF VARIOUS TYPES OF WASTE GENERATED IN RESIDENTIAL BUILDINGS

Garden waste

considered 3kg

per Sqm per

Year, in which

10% considered

Combustible (non-recyclable/ non-reusable)(waste with low calorifc value) -Food wrapping boxes and plastic foils/ Composite paper items (including takeaway food packing

Reusable/ recyclable - Plastic items (Including milk covers, water bottles & other bottles, Broken stationary like pen, pencil, eraser etc)/ Glass items including broken glasses) /

Broken or unusable utensils / Tin items (including aluminum wraps) / POP/ Electric wires, etc.

Combustible (non-recyclable/ non-reusable)(waste with high calorific value) -RDF / Rubber (including worn out tyres) / Thermocol / Broken Plastic Carton Boxes / Foam items,

Total

Combust

ible Dry

Waste

Garden Waste (4)

Wet

Waste

(1.a)

Sanita

ry

Wast

e

(2.b)

Biome

dical

waste

(2.c)

E-

Waste

(2.d)

Type of Building

Organic Waste (1)

Inorganic Waste (2)

Inert

Waste

(3)

Total

Waste

Hazard

ous

Waste

(2.e)

264

From

wet

waste

(1.b.i.a)

Other

combust

ible

wastes

(1.b.i.b)

A

B

C

D

E

F

G

H

I

J

K

L

M

=A+B+C+D

+E+F

+G+H+I+J

+K+L

N = B + C+ E

O

P

Q = N + O

1

Mercantile

(Wholesale &

Retail)

0.00%

0.00%

2

Business (Offices)

0.00%

0.00%

3

Hotels

(Excluding

restaurant &

kitchen area)

0.00%

0.00%

4

Educational

0.00%

0.00%

5

Assembly

0.00%

0.00%

6

Restaurants / Fast

food outlets

0.00%

0.00%

7

Hospitals

0.00%

0.00%

8

Markets (including

supermarkets and

hypermarkets)

0.00%

0.00%

9

Industrial (including

storage &

hazardous)

0.00%

0.00%

1

Organic Waste

1.a

Wet Waste - Raw vegetable, Meat & Fish waste, Leftover cooked or uncooked food, Eggshells, Minced wheat or other flour, Rotten rice, wheat and other grains, Coffee powder, pet poop/waste & litter, etc.

1.b

Dry waste

1.b.i.a Form wet waste - Fruit peels (Orange, Lemon, pomegranate, Watermelon, pineapple etc.), Sugarcane husk, etc.

1.b.i.b

1.b.ii Dry waste - ( reusable/ recyclable ) -Carton boxes (wooden, cardboards, etc.) / Rags & Ropes / Papers (including newspaper) etc.

2

Inorganic Waste

2.a

Dry waste

2.a.i

2.a.ii

2.a.iii

2.b

2.c

Biomedical waste - Bandages, Needles or syringes, Medicines, etc.

2.d

E-Waste - CFL and tube lights, Computer and accessories waste (including printer cartridges), Other electronic items

2.e

Hazardous Waste - Paints, Batteries, Solvents, Cleaning agents, Pesticides, waste oil (of Generator), etc

3

Inert Waste - Soil, Sand, Broken stones, waste mortar, hardened cement, etc

4

Garden Waste

Garden waste considered 3kg per Sqm per Year, inwhich 10% considered as branches/ roots and 90% considered as leaves.

Garden waste per day (Landscape area x 3kg per Sqm per year / 365)

Dry waste - Combustible (non-recyclable/ non-reusable) - Curry leaf plant stem/ coconut husk/ coconut shell/ used tender coconut husk/ Used tea bags/ Paper cups, plates & spoons/

Pieces of waste paper and cartons/ Pieces of Rags and ropes/ hair, etc.

Sanitary Waste - Ladies, Children and Adult Napkins

Total

Combust

ible Dry

Waste

including

garden

waste

ANNEXURE - VIIIB

(Combustible)

Dry Waste (1.b)

(Reusabl

e /

Recyclab

le)

(1.b.ii)

Dry Waste (2.a)

Reusabl

e /

Recycla

ble

waste

(2.a.iii)

Combustible

(non-

recyclable/n

on-reusable)

waste with

High

Combustibl

e (non-

recyclable/

non-

reusable)

waste with

Branche

s /roots Leaves

Sl No

ESTIMATED QUANTITY OF VARIOUS TYPES OF WASTE GENERATED IN NON-RESIDENTIAL BUILDINGS (EXCEPT INDUSTRIAL BUILDING)

Garden waste

considered 3kg

per Sqm per

Year, inwhich

10% considered

as branches/

roots and 90%

considered as

leaves.

Garden waste

per day

(Landscape area

x 3kg per Sqm

per year / 365)

Combustible (non-recyclable/ non-reusable)(waste with low calorifc value) -Food wrapping boxes and plastic foils/ Composite paper items (including takeaway food packing

boxes), Dry food packets (e.g, of bread, biscuits, ready to eat items without food items), etc.

Reusable/ recyclable - Plastic items (Including milk covers, water bottles & other bottles, Broken stationary like pen, pencil, eraser etc)/ Glass items including broken glasses)

/ Broken or unusable utensils / Tin items (including aluminum wraps) / POP/ Electric wires, etc.

Combustible (non-recyclable/ non-reusable)(waste with high calorific value) -RDF / Rubber (including worn out tyres) / Thermocol / Broken Plastic Carton Boxes / Foam

items, etc.

Total

Combust

ible Dry

Waste

Garden Waste (4)

Wet

Waste

(1.a)

Sanita

ry

Wast

e

(2.b)

Biome

dical

waste

(2.c)

E-

Wast

e

(2.d)

Type of Building

Organic Waste (1)

Inorganic Waste (2)

Inert

Waste

(3)

Total

Waste

Hazard

ous

Waste

(2.e)

265

Appendix-XVIII-A

VARIOUS TYPES OF SUGGESTED TREATMENTS FOR WET WASTE

Option-1 (Using Bins for composting with larvae of Black Soldier Flies)

Wet Waste is treated with Larvae of Black Soldier Flies (BSF) in Bins of various sizes. The usual sizes of Bins

are 15 Kgs, 30 Kgs and 45 Kgs. For large generators, concrete structures of suitable sizes may constructed.

The procedure followed for the treatment and disposal of Wet Waste is as follows;

a)

The Wet Waste is properly segregated at source (Primary Segregation inside the premises /

apartments) and rechecked in the treatment yard segregation tank.

b)

The orange and lemon peels, banana leaves, stems of curry leaf plant, coconut husk etc. are

removed from the wet waste, washed and dried separately for incineration.

c)

The Wet Waste and the dried items of (b) above are weighed separately and entered in the register.

d) The Wet Waste is then Shredded for reducing the volume and for easy decomposition /

consumption by the Larvae. Shredding reduces the volume of waste by about 20 %.

e)

The Wet Waste has to be dumped in each pair of bins (the bins have to be numbered Bin A1 &

A2 / B1 & B2 …. etc.) – To be marked on the Bin) as follows;

Sl.

No.

Days

Quantity of

Waste in Bin

A1 / B1 / …

etc.

(Kgs)

Quantity of

Waste in Bin

A2 / B2 / …

etc.

(Kgs)

Remarks

15

Kgs

30

Kgs

45

Kgs

15

Kgs

30

Kgs

45

Kgs

1

Day 1 to

Day 15

12

24

36

0

0

0

3kgs, 6kgs and 9kgs of Wet Waste is

dumped in the additional bin for the bin

sizes of 15 kgs, 30 kgs and 45 kgs

respectively, for the waste in excess of

12kgs, 24kgs and 36kgs.s

2

Day 16 to

Day 30

15

30

45

0

0

0

3

Day 31 to

Day 45

3

6

9

12

24

36

266

4

Day 46 to

Day 60

0

0

0

15

30

45

50% of waste to be removed from Bin A1 on

55th& 60th day

5

Day 61 to

Day 75

12

24

36

3

6

9

6

Day 76 to

Day 90

15

30

45

0

0

0

50% of waste each to be removed from Bin

A2 on 85th & 90th day

7

Day 91 to

Day 105

3

6

9

12

24

36

8

Day 106 to

Day 120

0

0

0

15

30

45

50% of waste each to be removed from Bin

A1 on 115th & 120th day

9

Day 121 to

Day 135

12

24

36

3

6

9

10

Day 136 to

Day 150

15

30

45

0

0

0

50% of waste each to be removed from Bin

A2 on 145th& 150th day

The process to be repeated in the above sequence

Note: 10% of cocopeat by weight of the wet waste has to be spread on the wet waste dumped in the Bin.

1. The waste removed from the bin (25% to 50% removed each time) has to be weighed and recorded.

Thereafter, the removed waste has to be dried in drying trays (covered with tarpaulin, if required, to

avoid getting wet during rains) for five days. Ensure that all the larvae of BSF are dead. The waste in

the drying trays has to be stirred 3 times a day for faster drying.

2. The dried waste has to be sieved (using sieve) and the fine waste (manure) has to be weighed and

stored in gunny bags (after recording), to be used as manure.

3. The residue of sieved manure (with the dead Larvae) shall be further shredded in the Shredder and

sieved to get additional quantity of manure and the final residue shall be incinerated or used for

gardening (after recording the weight).

4. Excess manure may be sold to required persons.

Option-2 (Using Automatic / Semi-Automatic Bio-Converter)

a)

The wet waste has to be placed in the Bio-Converter and mixed with saw dust or dry manure (of

the previous day’s) to achieve reasonable dryness to the waste to be treated.

b)

The wet waste is processed for a period of 4 hours to 8 hours or as per the manufacturer’s

specification, till the manure of required consistency is achieved.

c)

The treated waste is removed from the Bio-Converter and dried in open air till the manure is fully

dry.

267

d) The waste from the Bio-Converter is sieved (using sieve) and the fine waste (manure) has to be

weighed and stored in gunny bags (after recording), to be used as manure.

e)

The residue of sieved manure (with the dead Larvae) shall be further shredded in the Shredder

and sieved to get additional quantity of manure and the final residue shall be incinerated or used

for gardening (after recording the weight).

f)

Excess manure may be sold to required persons.

Appendix-XVIII-B

REQUIREMENTS / SPECIFICATION OF INCINERATORS

Standards for incineration:

The Emission from incinerators /thermal technologies in Solid Waste treatment/disposal facility shall meet

the following standards, namely:

Parameter

Emission Standard

(1)

(2)

(3)

Particulates

50 mg/Nm³

Standard refers to half hourly average value

HCl

50 mg/Nm³

Standard refers to half hourly average value

SO₂

200 mg/Nm³

Standard refers to half hourly average value

CO

100 mg/Nm³

Standard refers to half hourly average value

50 mg/Nm³

Standard refers to daily average value

Total Organic Carbon

20 mg/Nm³

Standard refers to half hourly average value

HF

4 mg/Nm³

Standard refers to half hourly average value

NOx (NO and NO₂

expressed as NO₂)

400 mg/Nm³

Standard refers to half hourly average value

Total dioxins and furans

0.1 ng TEQ/Nm³

Standard refers to 6-8 hours sampling. Please refer

guidelines for 17 concerned congeners for toxic

equivalence values to arrive at total toxic equivalence.

Cd + Th + their

compounds

0.05 mg/Nm³

Standard refers to sampling time anywhere between

30 minutes and 8 hours.

Hg and its compounds

0.05 mg/Nm³

Standard refers to sampling time anywhere between

30 minutes and 8 hours.

Sb + As + Pb + Cr + Co

+ Cu + Mn + Ni + V +

their compounds

0.05 mg/Nm³

Standard refers to sampling time anywhere between

30 minutes and 8 hours.

Note: All values corrected to 11% oxygen on a dry basis.

Note:

1. Suitably designed pollution control devices shall be installed or retrofitted with the incinerator to

achieve the above emission limits.

2. Waste to be incinerated shall not be chemically treated with any chlorinated disinfectants.

3. Incineration of chlorinated plastics shall be phased out within two years.

4. If the concentration of toxic metals in incineration ash exceeds the limits specified in the Hazardous

Waste (Management, Handling and Trans boundary Movement) Rules, 2008, as amended from time

to time, the ash shall be sent to the hazardous waste treatment, storage and disposal facility.

5. Only low sulphur fuel like LDO, LSHS, Diesel, bio-mass, coal, LNG, CNG, RDF and bio-gas shall be

used as fuel in the incinerator.

6. The CO2 concentration in tail gas shall not be more than 7%.

268

7. All the facilities in twin chamber incinerators shall be designed to achieve a minimum temperature

of 950°C in secondary combustion chamber and with a gas residence time in secondary

combustion chamber not less than 2 (two) seconds.

8. Incineration plants shall be operated (combustion chambers) with such temperature, retention time

and turbulence, as to achieve total Organic Carbon (TOC) content in the slag and bottom ash less

than 3%, or the loss on ignition is less than 5% of the dry weight.

9. Odour from sites shall be managed as per guidelines of CPCB issued from time to time.

Ref: Solid waste management Rules, 2016 (MoEF&CC Notification dated 08th April 2016).

Operating Standards:

(Ref: CPCB website – Standards - Common HW Incinerators - Annexure 1)

1. All the facilities shall be designed to achieve a minimum temperature of 1100°C in secondary

combustion chamber and with a gas residence time in secondary combustion chamber not less than

2 (two) seconds.

2. The incineration facilities after initial operation of minimum one year, as per the guidelines and

standards, can submit a proposal for relaxation in temperature and retention time requirement if it

can be demonstrated that the flue gas standards and operation standards can be complied with at

lower temperatures and residence times. The State Pollution Control Board / Pollution Control

Committee, upon successful demonstration of compliance with flue gas standards by the facility, can

recommend the proposal made by the incineration facility for relaxation in temperature and residence

time, but in any case not less than 950oC and 1.5 seconds, for the consideration and approval of the

Central Board.

3. Incineration plants shall be operated (combustion chambers) with such temperature, retention time

and turbulence, so as to achieve Total Organic Carbon (TOC) content in the slag and bottom ashes

less than 3%, or their loss on ignition is less than 5% of the dry weight of the material.

4. Guidelines published by the Central Board from time to time for common incineration facilities shall

be referred for implementation.

5. All the project proposals submitted for establishment of the common incineration facilities shall be

examined and cleared by the Task Force constituted by the Central Board.

6. Notification of compliance: The operator of the incinerator shall undertake comprehensive

performance test. Within 90 days of completion of comprehensive performance test, the operator shall

issue a notification of compliance documenting compliance or non-compliance, as the case may be,

for public information / notice.

All norms of Incinerators and operation and maintenance standards should be followed time to time as

notified by the competent authority.

Processing of Domestic Hazardous Waste including Sanitary Waste.-The Domestic Hazardous Waste shall be

processed through TSDF (Treatment Storage Disposal Facility) authorised by the KSPCB, incineration and/or

any other suitable method determined by the KSPCB/CPCB. Sanitary Waste will be processed at the nearest

common biomedical treatment facility and/or incinerators in the Local Authority along with other Bio-medical

Waste generated within the Local Authority. If it is not processed through these methods, it shall be

transported to Sanitary Landfills.

269

270

TABLE - 1

DATE:

Project:

Address/Location:

Building Category:

(HIG / MIG / LIG / EWS)

Diversity of Occupancy *

TABLE - 2

DETAILS OF DWELLING UNITS

Type of Dwelling Units

No. of Dwelling Units

No. of

Persons

per

Unit

Total No.

of

Persons

Total No.

of

Persons

after

Diversity

1 Bedroom

4

0

0

2 Bedroom

5

0

0

3 Bedroom

6

0

0

4 Bedroom

7

0

0

TOTAL

0

0

0

ROUND OFF

* DIVERSITY OF OCCUPANCY

1 HIG (80% Occupancy) =

0.8

2 MIG (90% Occupancy) =

0.9

3 LIG & EWS (100% Occupancy)1.0

Per capita Solid Waste generated (kg/person/day) = 0.3 to 0.6 kg/capita/day (As per Part 9, Section 3, Solid Waste Management of NBC 2016)

1 HIG

(kg/capita/day)

0.45

2 MIG

(kg/capita/day)

0.40

3 LIG & EWS

(kg/capita/day)

0.35

Landscape area provided in the project (Sqm)

# Garden Waste

Garden waste considered 3kg per Sqm per Year, inwhich 10% considered as branches/ roots and 90% considered as leaves.

Garden waste per day (Landscape area x 3kg per Sqm per year / 365)

TABLE - 3

Others

Bins for

Composti

ng with

Larvae of

BSF

method /

Bio-

converter

s

ncinerato

Garde

n

Mulchi

ng ##

Deliver

ed to C

& D

waste

disposa

l yard

Delivere

d to

Ward

level

collectio

n centre

Recycli

ng

agency

1

Organic Waste

1.a Wet Waste

Raw vegetable, meat & fish waste,

Leftover cooked or uncooked food,

Eggshells, Minced wheat or other flour,

Rotten rice, wheat and other grains,

Coffee Powder, Pet poop/waste & litter,

etc.

0.00

Daily

0.00

1.b Dry Waste

1.b.

i

Combustible (non recylcable

/ non reusable)

1.b.

i.a From Wet waste

Fruit peels (Orange, Lemon,

pomegranate, Watermelon, pineapple

etc.), Sugarcane husk, etc.

0.00

Daily

0.00

1.b.

i.b Other combustible wastes

Curry leaf plant stem/ coconut husk/

coconut shell/ used tender coconut husk/

Used tea bags/ Paper cups, plates &

0.00

Daily

0.00

1.b.

ii Reusable/Recyclable

Carton boxes (wooden and cardboards,

etc) / Rags & Ropes / Papers (including

newspapers) etc.

0.00

Daily

0.00

2

Inorganic Waste

2.a Dry waste

2.a.

i

Combustible (non recyclable

/ non reusable) with low

calorific value

Food wrapping boxes and plastic foils/

Composite paper items (including

takeaway food packing boxes), Dry food

0.00

Daily

0.00

2.a.

ii

Combustible (non recyclable

/ non reusable) with high

calorific value

RDF / Rubber (including worn out tyres) /

Thermocol / Broken Plastic Carton Boxes /

Foam items, etc.

0.00

Daily

0.00

2.a.

iii Reusable / Recyclable waste

Plastic items (including milk covers, water

bottles & other bottles, Broken Stationery

like pen, pencil, eraser etc.) / Glass items

(including broken glasses) / Broken or

unusable utensils / Tin items (including

aluminium wraps) / POP / Electric wires,

etc

0.00

Weekly

0.00

2.b Sanitary Waste

Ladies, Children and Adult Napkins

0.00

Daily

0.00

2.c Biomedical waste

Bandages / Needles or syringes /

medicines, etc.

0.00

Fortnigh

tly

0.00

2.d E-Waste

CFL and tube lights / Computer and

accessories waste (including printer

cartridges) / Other electronic items

0.00

Fortnigh

tly

0.00

2.e Hazardous Waste

Paints, batteries, solvents, cleaning

agents, pesticides, waste oil (of

generator) etc.

0.00

Fortnigh

tly

0.00

3

Inert Waste

Soil, sand, broken stones, waste mortar,

hardened cement, etc

0.00

Weekly

0.00

4

Garden Waste #

a. Branches /roots (10% of total garden

waste)

0.001

0.00

Daily

0.00

b. Leaves (90% of total garden waste)

0.007

0.00

Daily

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

**

##

Quantity of waste = Total No. of persons after diversity x Waste per capita per day (for the building category) x % waste (for the building category as per

Annexure 1)

Only fresh leaves & flowers have to be used for garden mulching. Dry leaves and roots/branches to be used for incinerarion if available or to be sent to

MCC facility.

ANNEXURE XVIII - F1

SOLID WASTE ASSESSMENT AND MANAGEMENT FOR RESIDENTIAL BUILDINGS

Assumptions made for Solid Waste generated for Residential Buildings:

It is proposed to treat some of the wastes generated in the Project site itself using Bins for composting with Larvae of Black Soldier Flies method (or Bio-

converters machines) and Incinerator and the remaining wastes shall be disposed to the various facilities of MCC as mentioned below.

Solid waste from Residential Buildings during operation phase are classified as follows for segregation and treatment:

MCC Facility

Garden Waste

Total Quantity of Waste Generated / Day (kg)

Sl. No

Type of Waste

Quantit

y of

Waste

(%)

(refer

Annexur

e 1)

Quantit

y of

Waste

(Kgs)**

Frequen

cy of

Treatme

nt /

Disposal

Type of Treatment

Insitu facility

271

TABLE - 1

DATE:

Project:

Address/Location:

Type of Building:

Diversity of Occupancy *

TABLE - 2

DETAILS OF PREMISES & OCCUPANTS

Type of premises use

Premises area

Total No.

of

Persons

Total No.

of

Persons

after

Diversity

0

0

0

0

0

0

0

0

TOTAL

0

0

0

ROUND OFF

Per capita Solid Waste generated (kg/person/day) = 0.3 to 0.6 kg/capita/day (As per Part 9, Section 3, Solid Waste Management of NBC 2016)

1 HIG

(kg/capita/day)

0.45

2 MIG

(kg/capita/day)

0.40

3 LIG & EWS

(kg/capita/day)

0.35

Landscape area provided in the project (Sqm)

# Garden Waste

Garden waste considered 3kg per Sqm per Year, inwhich 10% considered as branches/ roots and 90% considered as leaves.

Garden waste per day (Landscape area x 3kg per Sqm per year / 365)

TABLE - 3

Others

Bins for

Composti

ng with

Larvae of

BSF

method /

Bio-

converter

s

ncinerato

Garde

n

Mulchi

ng ###

Deliver

ed to C

& D

waste

disposa

l yard

Delivere

d to

Ward

level

collectio

n centre

Recycli

ng

agency

1

Organic Waste

1.a Wet Waste

Raw vegetable, meat & fish waste,

Leftover cooked or uncooked food,

Eggshells, Minced wheat or other flour,

Rotten rice, wheat and other grains,

Coffee Powder, Pet poop/waste & litter,

etc.

0.00

Daily

0.00

1.b Dry Waste

1.b.

i

Combustible (non recylcable

/ non reusable)

1.b.

i.a From Wet waste

Fruit peels (Orange, Lemon,

pomegranate, Watermelon, pineapple

etc.), Sugarcane husk, etc.

0.00

Daily

0.00

1.b.

i.b Other combustible wastes

Curry leaf plant stem/ coconut husk/

coconut shell/ used tender coconut husk/

Used tea bags/ Paper cups, plates &

0.00

Daily

0.00

1.b.

ii Reusable/Recyclable

Carton boxes (wooden and cardboards,

etc) / Rags & Ropes / Papers (including

newspapers) etc.

0.00

Daily

0.00

2

Inorganic Waste

2.a Dry waste

2.a.

i

Combustible (non recyclable

/ non reusable) with low

calorific value

Food wrapping boxes and plastic foils/

Composite paper items (including

takeaway food packing boxes), Dry food

0.00

Daily

0.00

2.a.

ii

Combustible (non recyclable

/ non reusable) with high

calorific value

RDF / Rubber (including worn out tyres) /

Thermocol / Broken Plastic Carton Boxes /

Foam items, etc.

0.00

Daily

0.00

2.a.

iii Reusable / Recyclable waste

Plastic items (including milk covers, water

bottles & other bottles, Broken Stationery

like pen, pencil, eraser etc.) / Glass items

(including broken glasses) / Broken or

unusable utensils / Tin items (including

aluminium wraps) / POP / Electric wires,

etc

0.00

Weekly

0.00

2.b Sanitary Waste

Ladies, Children and Adult Napkins

0.00

Daily

0.00

2.c Biomedical waste

Bandages / Needles or syringes /

medicines, etc.

0.00

Fortnigh

tly

0.00

2.d E-Waste

CFL and tube lights / Computer and

accessories waste (including printer

0.00

Fortnigh

tly

0.00

2.e Hazardous Waste

Paints, batteries, solvents, cleaning

agents, pesticides, waste oil (of

generator) etc.

0.00

Fortnigh

tly

0.00

3

Inert Waste

Soil, sand, broken stones, waste mortar,

hardened cement, etc

0.00

Weekly

0.00

4

Garden Waste #

a. Branches /roots (10% of total garden

waste)

0.001

0.00

Daily

0.00

b. Leaves (90% of total garden waste)

0.007

0.00

Daily

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

**

###

Quantity of waste = Total No. of persons after diversity x Waste per capita per day (for the building category) x % waste (for the building

category as per Annexure 1)

Only fresh leaves & flowers have to be used for garden mulching. Dry leaves and roots/branches to be used for incinerarion if available or to be

sent to MCC facility.

ANNEXURE XVIII - F2

SOLID WASTE ASSESSMENT AND MANAGEMENT FOR NON-RESIDENTIAL BUILDINGS

Assumptions made for Solid Waste generated for Residential Buildings:

It is proposed to treat some of the wastes generated in the Project site itself using Bins for composting with Larvae of Black Soldier Flies method (or Bio-

converters machines) and Incinerator and the remaining wastes shall be disposed to the various facilities of MCC as mentioned below.

Solid waste from Residential Buildings during operation phase are classified as follows for segregation and treatment:

MCC Facility

Garden Waste

Total Quantity of Waste Generated / Day (kg)

Sl. No

Type of Waste

Quantit

y of

Waste

(%)

(refer

Annexur

e 2)

Quantit

y of

Waste

(Kgs)**

Frequen

cy of

Treatme

nt /

Disposal

Type of Treatment

Insitu facility

272

APPENDIX-XIX

(see clause 15(3))

ACCREDITATION OF ENVIRONMENTAL AUDITORS (QUALIFIED BUILDING AUDITORS)

The Ministry of Environment, Forest and Climate Change (MoEFCC), through qualified agencies

shall accredit the Qualified Building Environment Auditors (QBEAs). The Qualified Building Environment

Auditors could be a firm /organization or an individual expert, who fulfils the requirements. The Ministry will

implement this process of accreditation through Quality Council of India (QCI), National Productivity Council

or any other organization identified by the Government. The organizations like Indian Green Building Council,

Bureau of Energy Efficiency etc. can also be associated in the process of accreditation, training, and renewal.

The environmental consultants accredited by the QCI for building sector will be qualified as QBEAs. The

QBEAs will meet the following criteria. The accrediting agency can improvise on these criteria.

Qualifications of the Auditor:

a. Education: Architect (Degree or Diploma), Town Planners (Degree), Civil Engineer / Mechanical

Engineer (Degree or Diploma), PG in Environmental Science or any other qualification as per the

scheme of the accreditation.

b. Training: Mandatory training to be given by the accreditation body or their approved training providers.

This will be as per the scheme of the accreditation.

c. Experience: At least 3 years of work experience in the related field or building sector Environment

Impact Assessment consultants accredited by QCI or any other experience criteria as per the scheme

of the accreditation.

d. Infrastructure and equipment: As per the scheme of the accreditation

e. Renewal: The accreditation will be valid for 5 years and will be renewed as per the process developed

under the accreditation scheme.

Accountability/Complaint redressal mechanism: Any complaints regarding the quality of the work of QBEAs

shall be made to the accreditation body. The accreditation body shall evaluate the complaint and take

appropriate action including black listing or cancellation of the accreditation with wide public notice. This

will be in addition to the action at the level of local authority for penalty and blacklisting. The Ministry can

also take such action in case of specific complaint or feedback.

273

APPENDIX-XX

(see clause 15(7))

ENVIRONMENTAL MONITORING CELL AT THE LEVEL OF THE AUTHORITY

An Environmental Cell shall be setup at the Local Authority level to support compliance and

monitoring of environmental conditions in buildings. The Cell shall also provide assistance in environmental

planning and capacity building within their jurisdiction. The responsibility of this cell would be monitoring

the implementation of this notification and providing an oversight to the Third-Party Auditing process. The

cell will operate under the local authority.

Constitution of the cell:

The cell shall be chaired by the Commissioner of the Local Authority and, TPO shall be the Member

Secretary of the cell.

The cell will comprise of at least 3 dedicated experts in any of the following fields, for every three

years period:

a. Waste management (solid and liquid)

b. Water conservation and management

c. Resource efficiency including Building materials

d. Energy Efficiency and renewable energy

e. Environmental planning including air quality management.

f. Transport planning and management.

The Cell shall induct at least two outside experts as per the requirements and background of

dedicated experts for every three years period. The Cell shall also have Works committee chairman and two

members (one Ruling party Corporator and another Opposition party Corporator) from the Council of the

Authority.

Financial Support:

An additional fee may be charged along with processing fee for building License for integrating

environmental conditions and it’s monitoring. The local authority can fix and revise this additional fee from

time to time. The amount of this fee shall be deposited in a separate bank account and used for meeting the

requirement of salary / emoluments of experts and running the system of online application, verifications

and the Environmental Cell.

Functions of the Cell:

1.

The cell shall be responsible for assessing and appraising the environmental concerns of the area

under their jurisdiction where building activities are proposed. The Cell can evolve and propose

additional environmental conditions as per requirements. These conditions may be area specific and

shall be notified in advance from time to time. These additional conditions shall be approved following

a due consultation process. These environmental conditions will be integrated in building Licenses

by the sanctioning authority.

2.

Develop and maintain an online system for application and payment of fees. The Cell shall maintain

an online database of all applications received, projects approved, the compliance audit report,

274

random inspections made. The Cell shall maintain a portal for public disclosure of project details

including self-certification and compliance audit reports filed by the Qualified Building Environment

Auditors for public scrutiny of compliance of environmental conditions by the project.

3.

Monitoring the work of Environmental Audit process carried by the Qualified Building Auditors.

4.

The Cell shall review the applications; finalize the additional environmental conditions if required

within 15 days of the submission of the application to the local authority.

5.

The Cell shall adopt risk based random selection of projects for verifying on site for certification of

QBA, compliance of environmental conditions and yearly audit report.

6.

The Cell shall recommend to the local authority for financial penalty for non-compliance of

environmental conditions by the project proponent.

7.

The Cell shall recommend to the accrediting body and the local authority against any Qualified

Building Environment Auditor, if any lapse is found in their work.

APPENDIX- XXI

(see Table 14.3 (note i))

CATEGORIES OF MATERIALS OF STORAGE OF WAREHOUSE AS PER COMBUSTION RISK.

A. Non-combustible materials:

Articles (which are Non- Combustible, Non -Flammable, Non -Corrosive, Non -toxic, Non-

poisonous, Non-Explosive) such as Cement, brick, mortar, hardware items, metals in solid bar/metal

goods (excluding those having melting point below 1000 o C)

B. Combustible Materials in following 4 sub categories

Category

Material Specifications

Stacking

Height

Mediu

m

(in m)

High

(in

m)

Category

I

Articles

such

as

Carpets,

Non-

synthetic/synthetic

yarn

and

fabrics.

Mechanical and electrical goods (dominantly

metal

parts),

Glassware

and

crockery,

fiberboards, groceries, metal goods, Papers

other than those listed under categories

Moderate and High, Powdered and canned

foods, Plastic/glass bottles containing non-

flammable liquids, etc.

4

6.5

Category

II

Articles

such

as

Batteries,

Baled

cotton/synthetic fibers, Books, Baled cork,

Baled

waste

paper,

Cartons

containing

alcohols ( in cans/bottles), Cartons of canned

lacquers which dry by solvent evaporation,

Chipboard,

Cardboard

rolls

(horizontally

Stored),

Cereals/Grains/Foodstuff/

Flour/Sugar in sacks, Cellulose/Cellulose

pulp, Electrical goods other than those stated

in Category low, Flammable liquids in non-

combustible

containers,

Leather

goods,

Palletized liquor stocks, Plastics (non-foamed,

other than cellulose nitrate), Rolled pulp and

paper

and

asphalted

paper

(Horizontal

3

5.5

275

storage), Veneer sheets, Wooden patterns,

Metal/wooden furniture with plastic seats,

etc.

Category

III

Articles such as Bitumen/Wax coated paper,

Candles, Carbon black, Card board rolls

(vertically stored), Charcoal, Coal> cellulose

nitrate, Foamed plastic and foam rubber

products, Flammable liquids in combustible

containers, Linoleum products, Matches,

Plastics other than those stated in Category

Moderate,

Rolled pulp

and paper

and

asphalted paper (vertical storage), Rubber

goods including tyres and tubes, Sawn

timber, Ventilated wood stacks, Waxed and

asphalt coated papers and containers in

cartons, Wood wool, wooden pallets and flats

(idle), Ail materials having wrappings or pre-

formed containers of foamed plastics, etc.

2

4.5

Category

IV

Off cuts and random pieces of foamed plastic

or rubber rolls of sheets of foamed plastic or

foamed rubber, Foam mattress, Expanded

polystyrene packaging, Foam upholstery, etc.

1.25

3.5

Explanations:

# The deflector of the sprinkler fitted in the ceiling shall be at more than

1.5 m from the goods stored below. However, in case of jute storage,

no jute stock shall reach within 2 m of the deflectors of the sprinkler

heads.

# In case of storage in racks or shelves, if the height of storage is more

than

what is specified, intermediate sprinklers shall be provided for each

shelf/rack in addition to the ceiling sprinklers and overall design

density

and AMAO shall be maintained as per Table 5 of IS: 15105.

# The aisle width between the storage stacks shall not be less than 2.5

m and the maximum area of each storage stack shall not be more

than 15.0m2. If these parameters are exceeded, the design density

applicable shall be loaded by 2.5 L/min/m2.

# In case of mixed storage (both moderate and high hazard storage) in

buildings, the parameters will be governed by the most hazardous

occupancy

Goods stored not higher

than what is stated above

for the appropriate category

or not higher than the eaves

height of the roofs or within

1 m of a flat ceiling

Whichever is the lowest

shall

be

regarded

as

moderate hazard storage. If

the above conditions are not

met,

the

risk

shall

be

regarded as high hazard

storage

Notes:

1.

Any new use which increase the number of occupants to a figure comparable with other classes

of occupancy shall change the classification of the building to that of the new use (for example,

Warehouse used \ for office purposes).

2.

Ware house buildings shall not include any article which is highly combustible or explosive

materials or products which are liable to bum with extreme rapidity and or which may produce

poisonous fumes or explosions for storage, handling and which involve highly corrosive, toxic or noxious

alkalis, acids or other liquids or chemicals producing flame, fumes and explosive, poisonous, irritant or

corrosive gases; and for the storage, handling of any material producing explosive mixtures of dust

which result in the division of matter in to fine particles subject to spontaneous ignition as such

buildings fall in Hazardous Building Category.

276

FORMS

FORM-I

(see clause 3.10.2, 3.13, 3.16.10(1))

DETAILS TO BE CONTAINED AND TO BE ATTACHED TO THE APPLICATION FORM FOR BUILDING

LICENCE AND OTHER COMMON DETAILS REQUIRED FOR ALL NOCS.

A. General Information to be provided (Common for Building Licence and other NOCs):

1. Particulars of Applicant:

a)

Name –

b)

Address –

c)

Contact details –

i. Phone No. (office) –

ii. Phone No. (mobile) –

d)

Identification proof (Aadhaar / Voter ID / Driving Licence / Passport) –

e)

Whether the Applicant is –

i. The owner of the plot -

ii. GPA holder

iii. Promoter, representing the Owner

2. Project Name & Address:

3. Particulars of land:

a)

Survey No. –

b)

Revenue Ward / Village No. –

c)

Taluk –

d)

District –

e)

PID no. (if available) –

f)

Boundary (Checkbandi) –

i. North –

ii. East –

iii. West –

iv. South –

g)

Land Use –

h) Total Extent of Plot –

i. As per Document (Sqm / Cents) –

ii. As per Revenue Records (Sqm / Cents)–

i)

Extent of Karaab land if any –

j)

Extent surrendered for road widening –

i. As per Document (Sqm / Cents) –

ii. As per Enjoyment (surveyed using ETS) (Sqm / Cents) –

k)

Net Extent considered –

i. For Development (as per document) –

ii. For Development (as per enjoyment) –

iii. For Development (for Statutory Approval) –

l)

Extent considered for FAR (for Statutory Approval) –

m) Market value of the plot (as per guideline value published under the Karnataka Stamp Act);

277

i. Value (in Rs./Sqm) –

ii. Reference No. (as per the published list) –

4. Particulars of Approach Road:

a)

No. of Roads abutting the plot (Road 1, Road 2, Road 3, Road 4) –

Note: Roads including lanes from which approaches may not be taken for the plot.

b)

No. of Roads from which approach to the plot is considered (from the total no. of roads abutting

the plot) –

c)

Details of roads abutting the plot –

Road 1 –

i. Road Name and limits –

Note: As specified by MCC and for areas outside MCC limits, as specified in the list

published under Section 4B of Karnataka Stamp Act.

ii. Road Code –

Note: As specified by MCC and for areas outside MCC limits, as specified in the list

published under Section 4B of Karnataka Stamp Act.

iii. Existing road width (m) –

Note: Average width and minimum width to be mentioned in case of varying width of

road.

iv. Proposed road width (m) –

Note: Proposed width as per Master Plan or as proposed by MUDA or as proposed by

MCC, to be mentioned.

Note: Similar details have to be provided for all roads abutting the plot.

d)

Details of exclusive means of access (as per Clause No.4.2 of the ZR), if applicable –

5. Particulars of Building:

a)

No, of Building Blocks –

Note: specify the following details for each block, in case of multiple blocks of buildings

b)

Type of Development proposed for Building Licence (New Construction / Reconstruction - Addition

– Alteration / Revised Licence:

c)

Type of Building (B1, B2, B3, B4, B5) –

d)

Use of Building (Residential / commercial / mixed use / other uses) –

e)

No. of Floors (Basement + Ground + upper floors) –

Note: Specify no. of basement floors, lower ground floor & upper ground floor and mezzanine floor

as applicable

f)

Floor wise details of occupancy / use [as per clause 2(21) of BBL]–

iii. Basement Floor –

Note: Separately to be provided in case of more no. of basement floors

iv. Ground Floor –

Note: Separately to be provided in case of Lower Ground Floor & Upper Ground Floor

v. Mezzanine Floor (if applicable in case of Commercial Buildings) –

278

vi. First Floor –

vii. Second Floor –

viii. Third Floor –

ix. Fourth Floor –

x. Fifth Floor –

Note: Separate Annexure to be provided in case of more no. of floors.

g)

For residential apartment buildings only -

Sl.

No.

Floor

No. of Apartments

I BHK

II BHK

III BHK

IV BHK

V BHK

Total

1

2

3

Total

h) Height of the Building –

i. Height considered (from road / from average level of the ground contiguous to the building) –

ii. Height of the Building (m) –

i)

Plot Coverage –

i. Permitted –

ii. Actual –

j)

Summary of Parking Facility (Detailed calculations provided in Table-1) –

Sl.

No.

Particulars

Parking provisions

Required

Provided

Within the Building

(Covered Parking)

In the Yard

Covered

Open

1.

4-Wheelers

2.

4-Wheeler Visitors

3.

2-Wheelers

4.

Autorickshaws

279

5.

Lorries

6.

Buses

k)

Summary of Power Supply (Detailed calculations provided in _____):

i. Total Power required - _____ KVA

ii. Source (MESCOM / GENERATOR / RENEWABLE ENERGY) –

iii. Transformer capacity - ____ KVA / Not Applicable

iv. Diesel Generator capacity - _____ KVA / Not Applicable

v. Power generated through renewable energy - ______ KVA

l)

Summary of Water Supply (Detailed calculations provided in _____):

i. Source (Open Well / Bore Well / MCC) –

ii. Total Freshwater requirement - ____ KLD

iii. Total Treated water requirement - _____ KLD

m) Summary of Water tanks (Detailed calculations provided in _____):

Sl No

Tank

Sump Capacity

(Litres)

OHT capacity

(Litres)

1

Fire Reserve (including water curtain)

2

Domestic

3

Treated water

n) Staircase details:

Sl.

No.

Staircase

Description

Staircase

Width (m)

No. of Steps (nos.)

Tread

Width

(m)

Riser

Height

(m)

Head

Room

Height

(m)

Handrail

Height

(m)

Flight 1

Flight 2

1.

2.

Note: Details of each staircase of the building have to be provided

o)

Lift Summary (Detailed calculations provided in _____):

280

Sl.

No.

Lift

Lift Well Size

Speed (MPS)

Capacity

(Persons/KG)

1

Passenger Lift 1

2

Passenger Lift 1

3

Passenger Lift 1

4

Service Lift 1

Service Lift 1

6. Details of Professionals on Record (PoR):

b. For drawings

c.

For supervision

d. For structural design

e.

For MEP

Note: Specify any other PoR appointed for the project, as per the Building Byelaws

B. General Documents to be Attached (Common for Building Licence and other NOCs)

1. Copy of the Title document such as Sale Deed, etc.;

2. Copy of the registered document of GPA / authorisation letter, if applicable;

3. Photo and other identity proof of the applicant;

4. RTC or Khata as on date of application;

5. Property Tax paid receipt

6. Joint development Agreement or MOU and affidavit of all the owners of plots amalgamated for approval

of plot;

7. Survey sketch issued by Revenue Department for NA conversion or any other purpose;

8. NA Conversion Order;

9. Structural Stability Certificate from the Structural Engineer

10. Google Location showing project boundaries & coordinates

11. Photographs of the site (minimum 4 nos., each from north, south, east and west) showing the natural

and built developments within the site and also the abutting roads;

12. Copy of the plot approval obtained

13. Project Costing – Table 3

14. Specification of the Building – Table 4

15. Any other documents specified by the Local Authority or notified by the Government;

C. General Drawings to be Attached(Common for Building Licence and other NOCs)

1. Key Plan

2. Site Plan

a)

As per Document

281

b)

As per enjoyment (surveyed using ETS)

c)

As per Drone Survey Map

d)

As per Revenue Records

e)

Superimposed sketch of all the above site plans and showing the boundaries of the final site plan

considered for statutory approval.

f)

Final Site Plan considered for statutory approval.

3. All Floor plans for Parking areas and other uses (Basement floors, Ground floors, upper floors and

terrace floor)

4. Sections of the Building

5. Elevations of the Building

D. General Checklists to be Attached(Common for Building Licence and other NOCs)

(manual checklist is not required since the checking is done online)

E. General Calculation Sheets to be Attached (for Building licence and other NOCs)

1. Table 1

AREA CALCULATION FORMAT FOR COMMERCIAL / RESIDENTIAL PROJECT

FLOOR AREA DETAILS IN sqm

FLOO

R

TOTAL

CONSTRUCTIO

N AREA

EXEMPTED AREA

COMMERCIAL

RESIDENTIAL

NET

FLOOR

AREA

STAIRCASE

/ LIFT

LOBBY

LANDSCAP

E

DUCTS/

CUTOU

T

PARKIN

G

SUB

TOTA

L

SHO

P

ARE

A

TOILE

T

AREA

TOTA

L

FLOO

R

AREA

CIVIC

AMINITE

S

TOTAL

TOTA

L

CAR PARKING CALCULATION

COMMERCIAL PARKING REQUIREMENTS

SHOPS AREA FOR PARKING CALCULATION

=

SQM

CARPARK REQUIREMENT FOR SHOP AREA (1 NO. FOR 50 SQM OF AREA)

=

NOS. (SAY --- NOS)

25% OF TWO WHEELER PARKING REQUIRED

=

NOS.(SAY -- NOS)

SL. NO.

AREA OF APARTMENT

NO. OF

APARTMENT

MULTIPLY FACTOR AS PER Z.R.

CAR PARKING

REQUIRED AS PER

Z.R.

1

<75

0.5

2

75 TO 175

1

3

175>

2

TOTAL

282

10 % VISITORS PARKING FOR RESIDENTIAL APARTMENTS

TOTAL PARKING REQUIRED

25% TWO WHEELER PARKING REQUIRED

TOTAL No.OF PARKING REQUIRED FOR RESIDENTIAL & COMMERCIAL

TOTAL No.OF PARKING PROVIDED

TOTAL No.2 WHEELER REQUIRED FOR RESIDENTIAL & COMMERCIAL

TOTAL No.OF 2 WHEELER PROVIDED

3. Table 3

PROJECT COST

APPROXIMATE COST OF CONSTRUCTION OF THE

PROPOSED RESIDENTIAL BUILDING “-----’ ON LAND SY.NO. --- AT ---- VILLAGE NO----,

MANGALURU TALUK, D.K. DIST.

Total Construction area

-

m2

Cost of Building

Ground Floor Construction area

-

m2

Cost @ Rs. -----/ m2

= Rs.

Upper Floors Construction area

-

m2

Cost @ Rs. ----/ m2

= Rs.

Total cost of building

= Rs

ROUNDED OFF TO Rs. -----------------------------------------ONLY

LAND COST PER CENT = --------PER CENT (S.L NO----- OF SUB REGISTRAR BOOK, MANGALURU CITY/ THALUK -

2018-19)

LAND COST FOR --- CENTS = Rs.

ROUNDED OFF TO Rs. ---------------------------------------- ONLY

TOTAL PROJECT COST = Rs. -

283

ROUNDED OFF TO Rs. ----------------------------------------- ONLY

4. Table 4

SPECIFICATIONS OF COMPONENTS OF BUILDING

The minimum specifications of the various components in different types of buildings shall be specified along

with the application for building licence, selected from the list mentioned herebelow or specified separately.

Sl.

No.

Component

of

Building

Standard Specifications

Specification for the

building

1.

Foundation

Masonry / RCC / Others

2.

Load

bearing

superstructure

Fully RCC / Fully Masonry / RCC columns and

Masonry infill / others

Roof

Tiles / RCC / Others

Main Door Frame

Teak wood / Jungle wood / Aluminum / UPVC

/ Steel / Concrete / Others

Inside Door Frame

Toilet Door Frame

Main Door Shutter

Inside Door Shutter

Toilet Door Shutter

Window Frame

Window Shutter

Flooring for common

areas*

Flooring

for specific

premises*

Flooring for common

toilets *

Flooring for toilets in

specific areas*

Wall

cladding

for

common toilets*

Wall

cladding

for

toilets

in

specific

premises*

Wall

cladding

for

kitchen

Wall cladding for other

areas (specify areas) *

Plumbing Fittings for

common toilets*

Sanitary

fittings

for

common toilets*

Plumbing Fittings for

toilets

in

specific

areas*

Sanitary

fittings

for

toilets

in

specific

areas*

Ceiling painting in Car

Parking areas

Ceiling

painting

in

Common areas

Ceiling

painting

in

Specific areas

wall painting in Car

Parking areas

284

wall

painting

in

Common areas

wall

painting

in

Specific areas

Yard Pavement works

Lift

Transformer

Generator

Water Source

Sewerage System

Fire Fighting System

Not Applicable / Applicable (if applicable,

details of NOC)

Green cover and tree

plantation

Not Applicable / Applicable (if applicable,

details to be annexed)

Rain water harvesting

system

Not Applicable / Applicable (if applicable,

details to be annexed)

Low

water

consumption

plumbing fixtures

Not Applicable / Applicable (if applicable,

details to be annexed)

Waste water treatment

and reuse

Not Applicable / Applicable (if applicable,

details to be annexed)

Reduction

of

Hardscape

Not Applicable / Applicable (if applicable,

details to be annexed)

Solar

water

heating

system

Provided (if provided, details to the annexed) /

Not provided (if not provided, details of

alternate hot water system provided and the

details of additional PV panels provided have to

be specified and annexed)

Solar

Photovoltaic

panels

Not Applicable / Applicable (if applicable,

details to be annexed)

Low

energy

consumption electrical

fixtures

Energy

efficiency

in

HVAC systems

Lighting of common

areas by LED devices

Organic

waste

management

Compliance

with

ECBC norms

Construction

&

demolition

waste

management

Additional

Specifications**

Specification has to be specified for the

respective component

Note:

1. In case of ‘others’, the specification has to be clearly mentioned.

2. If any of the items are not provided by the Promoter / Owner and the same has to be done by the purchaser

as per his choice, then it has to be mentioned specifically as ‘Purchaser Supply’.

3. In case of ceramic or vitrified or any other tiles used for flooring and dadoing, the minimum size of the tiles

have to be mentioned.

4. ‘*’ if specifications are different for different areas of the Premises or Common areas of the building, details

have to be specified separately.

285

5. ‘**’ in case of additional specifications for Common areas of the building or Premises, details have to be

specified separately.

6. If any changes have to be made in the specifications, the same has to be informed to the Local Authority

and RERA, before executing such changes and after fulfilling the conditions of RERA.

Specifications of the Building

1. Super Structure of the Building

a)

Foundation * (Masonry / RCC / Others)

b)

Load bearing superstructure * (Fully RCC / Fully Masonry / RCC columns and Masonry infill /

others)

c)

Roof * (Tiles / RCC / Others)

d)

Finishing of external surface * (Plastered surface / Granite or Tile cladding / Texture finish /

Glass / ACP or combination of any of the above) – In case of combination, specify the respective

combinations

2. Internal Finishes of the Building

a)

For Common Areas

i.

Main area Flooring * (Cement Mortar / Cement tiles with polishing / Ceramic tiles /

Vitrified tiles / Marble / Granite / Others)

ii.

Toilet Flooring * (Cement Mortar / Cement tiles with polishing / Ceramic tiles / Vitrified

tiles / Marble / Granite / Others)

iii.

Electrical switches (Type of switches – preferred brand name may be mentioned)

iv.

Electrical fixtures (lights / fans / exhaust fans / other fixtures)

v.

Plumbing fixtures (Type of fixtures – preferred brand name may be mentioned)

vi.

Sanitary fixtures (Type of fixtures – preferred brand name may be mentioned)

vii.

Painting (type of painting for ceiling and walls) / Purchaser’s Scope

viii.

Painting (type of painting for ceiling and walls) / Purchaser’s Scope

ix.

Railing for passages * (Glass / S.S / S.S & Glass / Wooden / Aluminium / M.S / Other)

x.

Railing for staircase * (Glass / S.S / S.S & Glass / Wooden / Aluminium / M.S / Other)

b)

For Premises

i.

Entrance Door Frame (Teak wood / Jungle wood / Aluminum / UPVC / Steel / Concrete

/ Others / Purchaser’s Scope)

ii.

Entrance Door Shutter (Teak wood / Jungle wood / Aluminum / UPVC / Steel / Concrete

/ Glass / Others / Purchaser’s Scope)

iii.

Internal Door Frame (including door to balcony) * (Teak wood / Jungle wood / Aluminum

/ UPVC / Steel / Concrete / Others / Purchaser’s Scope)

iv.

Internal Door Shutter (including door to balcony) * (Teak wood / Jungle wood /

Aluminum / UPVC / Steel / Concrete / Glass / Others / Purchaser’s Scope)

v.

Toilet Door Frame * (Teak wood / Jungle wood / Aluminum / UPVC / Steel / Concrete

/ Others / Purchaser’s Scope)

vi.

Internal Door Shutter * (Teak wood / Jungle wood / Aluminum / UPVC / Steel /

Concrete / Glass / Others / Purchaser’s Scope)

vii.

Main area Flooring * (Cement Mortar / Cement tiles with polishing / Ceramic tiles /

Vitrified tiles / Marble / Granite / Others / Purchaser’s Scope)

viii.

Balcony Flooring * (Cement Mortar / Cement tiles with polishing / Ceramic tiles /

Vitrified tiles / Marble / Granite / Others / Purchaser’s Scope)

ix.

Toilet Flooring * (Cement Mortar / Cement tiles with polishing / Ceramic tiles / Vitrified

tiles / Marble / Granite / Others / Purchaser’s Scope)

x.

Electrical switches (Type of switches – preferred brand name may be mentioned) /

Purchaser’s Scope

xi.

Electrical fixtures (lights / fans / exhaust fans / other fixtures) / Purchaser’s Scope

286

xii.

Plumbing fixtures (Type of fixtures – preferred brand name may be mentioned) /

Purchaser’s Scope

xiii.

Sanitary fixtures (Type of fixtures – preferred brand name may be mentioned) /

Purchaser’s Scope

xiv.

Railing for balconies * (Glass / S.S / S.S & Glass / Wooden / Aluminium / M.S / Other)

xv.

Painting (type of painting for ceiling and walls) / Purchaser’s Scope

xvi.

Kitchen platform (Granite / Kadaba / others / Purchaser’s Scope)

xvii.

Kitchen Sink (S.S / Granite / Others / Purchaser’s Scope)

xviii.

3. For vertical circulation

a)

Elevators (specify the nos. and capacity of each passenger elevator and service elevator)

b)

Escalators / Travellators (specify the nos. and the connecting floors)

4. Hot water system (Solar / Solar with Heat Pump / Heat Pump) – mention the capacity of solar hot

water panels / Heat pump

5. Hot water tank capacity

6. Water pumps (Gravity flow pumps / Hydro pneumatic pumps)

7. Water reducing plumbing fixtures

8. Sewerage System and disposal arrangement

i.

Sewer disposal system (City level UGD / Septic Tank / STP / STP and

ii.

Dual pipeline system for flushing / gardening / cooling towers (in case of STP)

9. Provisions for Alternate Energy usage

i.

Solar PV Panels (5% of the estimated / consumed power load)

10. Rainwater harvesting system

i.

For consumption of rainwater

ii.

For Ground water recharging

11. Firefighting system

i.

Automatic Sprinklers

12. Green building provisions

a)

Total extent of Open Spaces (other than the coverage area)

b)

Total extent of Green Cover / Landscape area (20% of the Open Space)

c)

Total no. of trees planted (@ 1 tree for every 80 Sqm of the net extent of plot, after deducting the

portion surrendered for road widening)

13. Other Amenities / Facilities

a)

Gym

b)

Swimming Pool

c)

Shuttle Badminton Court (indoor / outdoor)

d)

Tennis Court

e)

Basket Ball Court

f)

Squash Court

g)

Table Tennis (indoor)

h) Other Club house facilities (Board games room / Coffee shop / Saloon / Massage parlour / Spa

/ Creche / Medical centre)

i)

Children’s play area with equipment

j)

Senior Citizen’s Park with equipment

k)

Video Door Phone (with / without Intercom facility)

l)

Electric fixtures of lights and fans in the premises

m) Cable TV / DTH

n) Reticulated / City Gas connection to kitchen

o)

Centralised RO plant

p)

Telephone connection

287

FORM-II

(see clause 3.10.2, 3.17.2)

DETAILS TO BE CONTAINED AND TO BE ATTACHED TO THE APPLICATION FOR NOCS FROM

DIFFERENT DEPARTMENTS (as specified by the concerned department), IN ADDITION TO THE

DETAILS REQUIRED FOR BUILDING LICENCE IN FORM-I (COMMON APPLICATION FORM)

IIa.

From Department of Fire and Emergency Services

(wherever required and as specified by the department)

IIb.

From Environment Monitoring Cell (see clause 15.1.2)

(till the time of approval of the Byelaws by the GOI and permission is granted to obtain EC from the

Environment Monitoring Cell of the Authority, EC has to be obtained from MoEF&CC and CFE &

CFO from KSPCB)

(wherever required and as specified by the department)

IIc.

From Airport Authority of India

(in cases where it is required as specified in the ZR and as specified by the department)

IId.

From Coastal Regulation Zone Authority

(wherever required and as specified by the department)

IIe.

From Indian Railways

(wherever required and as specified by the department)

IIf.

From Heritage conservation committee

(as specified by the government)

IIg.

From National Monuments Authority

(as specified by the government)

IIh.

From Urban Arts Commission

(as specified by the government)

After completion of the works at site as per the conditions of NOC, the applicant shall apply for clearance

certificate / certificate of approval of works from the departments which have issued NOCs, in Form II by

filling the relevant portions of the Form (only in cases where a condition for obtaining such clearance

certificate / certificate of approval of works, is mentioned in the NOC).

288

FORM-III

(see clause 3.10.3)

DETAILS TO BE CONTAINED IN THE ENDORSEMENT ISSUED BY THE LOCAL AUTHORITY TO THE

APPLICANT REGARDING DISCREPANCY IN THE DOCUMENTS SUBMITTED

1. Name and address of the Applicant;

2. Details of the application for building licence;

3. Document having discrepancy;

4. Details of discrepancy; and

5. Details of rectification proposed, if any

FORM-IV

(see clause 3.10.4(2))

DETAILS TO BE CONTAINED IN THE ENDORSEMENT ISSUED BY THE LOCAL AUTHORITY TO THE

APPLICANT REGARDING DISCREPANCY IN THE PLANS AND DETAILS SUBMITTED FOR

SANCTION OF BUILDING LICENCE

1. Name and address of the Applicant;

2. Details of the application for building licence;

3. Drawings having discrepancy (specify for each drawing separately);

4. Details of discrepancy in drawings (specify for each drawing separately);

5. Details of discrepancy in the conditions for obtaining NOCs from other departments; and

6. Details of rectification proposed, if any;

FORM-V

(see clause 3.10.6(1))

DETAILS TO BE CONTAINED IN THE INTIMATION LETTER OF THE LOCAL AUTHORITY TO LICENSED

PROFESSIONAL FOR SITE INSPECTION AND SUBMISSION OF SITE INSPECTION REPORT FOR

APPROVAL OF SITE PLAN

1. Name and address of the Applicant;

2. Details of the application for building licence;

3. Name and address of the Professional on record for preparing drawing;

4. Details of the building site in which building licence is applied for;

5. Copies of the relevant documents;

6. Details of the site plan and other technical drawings & details submitted;

FORM-VI

(see clause 3.10.6 (2))

DETAILS TO BE CONTAINED IN THE SITE INSPECTION REPORT

1. Name and the address of the Applicant;

2. Name and the address of the professional on record for drawings;

3. Name and the address of the licensed professional or designated officer;

289

4. Particulars of the Plot;

5. Date of inspection;

6. Noting of site inspection;

7. Acknowledgement of applicant and professional on record

8. Date of submission of report;

FORM-VII

(see clause 3.10.7)

DETAILS TO BE CONTAINED IN THE ENDORSEMENT ISSUED BY THE LOCAL AUTHORITY TO THE

APPLICANT REGARDING DISCREPANCY IN THE SITE INSPECTION REPORT

1. Name and address of the Applicant;

2. Details of the application for building licence;

3. Name and address of the Professional on record for preparing drawing;

4. Name and address of the licensed professional who has submitted the inspection report;

5. Drawings having discrepancy (specify for each drawing separately);

6. Details of discrepancy in drawings (specify for each drawing separately);

7. Details of rectification proposed, if any;

FORM-VIII

(see clause 3.15.1, 15.1.1)

DETAILS TO BE CONTAINED IN THE BUILDING LICENCE

1. Name and address of Local Authority with logo

2. Type of building licence

3. Building licence no. and date

4. . Plot approval details

5. Particulars of Plot

6. Name and address of Applicant

7. Name and address of Professionals on record for drawings

8. . Name and address of Professionals on record for supervision

9. Particulars of the building (floor area, construction area, parking details, etc.,)

10. . NOCs received

11. Various fees paid

12. Licence validity period

13. Other Terms and conditions of licence

14. Seal and signature of Commissioner

290

FORM-VIIIA

(see clause 3.16.4(3))

DETAILS TO BE CONTAINED IN THE COMMENCEMENT CERTIFICATE

1. Name and address of Local Authority with logo

2. Type of building licence

3. Building licence no. and date

4. Name and address of Applicant

5. Name and address of Professionals on record for drawings

6. . Name and address of Professionals on record for supervision

7. Particulars of the building (floor area, construction area, parking details, etc.,)

8. . Reference of Site Inspection Report of licensed Professional

9. Initial Validity period of Licence

10. Other Terms and conditions of licence

11. Seal and signature of Commissioner

FORM-IX

(see clause 3.16.5 (1))

DETAILS TO BE DISPLAYED OUTSIDE THE CONSTRUCTION SITE.

1. Name and address of the Applicant;

2. Details of the building licence (extent of site, existing and proposed width of roads abutting the road

and name of roads as per the records of the Authority, no. of building blocks and for each block – no.

of floors, all-round setbacks, no. of basement floors, total floor area eligible and proposed –

permissible, premium and TDR, no. of 4-wheeler and 2-wheeler parking required and provided,

including visitors parking – within the building and outside the building, both covered and open)

3. Details of Professionals on Record to prepare the drawings;

4. Details of Professionals on Record to supervise the works;

5. Site plan

6. 3D view of the building (if proposed in any advertisement of the promoter)

FORM-X

(see clause 3.16.7(3&4), 3.16.9(1), 3.17.2(10&11))

DETAILS TO BE CONTAINED IN THE SITE INSPECTION REPORT OF

LICENSED

PROFESSIONAL, STATING THE DEFECTS / DEVIATIONS IN WORKS EXECUTED AT SITE.

1. Name and address of the Applicant.

2. Name and address of the professional on record for supervision

291

3. Name and address of contractor executing work

4. Name and address of licensed professional

5. Name and address of the Authority

6. Particulars of the Plot

7. Noting of site inspection (stating the defects / deviations in works executed, from the

approved plans, specifying the related drawing)

8. Acknowledgement of applicant and professional on record

9. Date of inspection

10. Date of submission of report

FORM-XI

(see clause 3.16.7(5))

DETAILS TO BE CONTAINED IN THE ENDORSEMENT ISSUED BY THE LOCAL AUTHORITY TO THE

APPLICANT TO RECTIFY THE DEFECTS IN WORKS EXECUTED.

1. Name and address of the Applicant;

2. Details of the application for building licence;

3. Name and address of the Professional on record for supervision;

4. Name and address of the licensed professional who has submitted the inspection report;

5. Works having defects / deviations from approved drawings (specify for each drawing separately);

6. Details of discrepancy in works executed (specify for each drawing separately);

7. Details of rectification proposed, if any;

FORM-XII

(see clause 3.16.7(9&11), 3.17.2(8), 3.17.2(10))

DETAILS TO BE CONTAINED IN INSPECTION REPORT OF COMMISSIONER REGARDING OBJECTIONS

RAISED BY THE APPLICANT AGAINST THE INSPECTION REPORT OF

LICENSED

PROFESSIONAL OR DEPARTMENT ISSUING NOCs.

1. Name and address of the Applicant.

2. Name and address of the professional on record for supervision

3. Name and address of contractor executing work

4. Name and address of licensed professional

5. Name and address of the Authority

6. Name and address of the Department which issued NOC (if objection is raised against such

department)

7. Particulars of the Plot

8. Noting of site inspection (stating the changes to be made by the applicant in works executed, if

applicable, or certifying the works executed)

9. Acknowledgement of applicant, professional on record and designated officer of the department (if

applicable)

292

10. Date of inspection

11. Date of submission of report

FORM-XIII

(see clause 3.17.1(1), 3.18)

DETAILS TO BE CONTAINED IN COMPLETION REPORT SUBMITTED BY THE LICENSED

PROFESSIONAL, SUPERVISING THE WORKS.

1. Name and address of Local Authority with logo

2. Type of building licence issued

3. Building licence no. and date

4. Plot approval details

5. Particulars of Plot

6. Name and address of Applicant

7. Name and address of Professionals on record for drawings

8. Name and address of Professionals on record for supervision

9. Particulars of the building (floor area, construction area, parking details, etc.,) as built in site

10. Details of certification by licensed professional

11. Signature of Professional on record for supervision

FORM-XIV

(see clause 3.18)

DETAILS TO BE CONTAINED IN THE OCCUPATION CERTIFICATE.

1. Name and address of Local Authority with logo

2. Type of building licence issued

3. Building licence no. and date

4. Plot approval details

5. Particulars of Plot

6. Name and address of Applicant

7. Name and address of Professionals on record for drawings

8. Name and address of Professionals on record for supervision

9. Particulars of the building (floor area, construction area, parking details, etc.,)

293

10. Approvals received from other departments which issued NOCs

11. Details of completion certificate

12. Details of certification by licensed professional

13. Other Terms and conditions of occupation

14. Date and no. of occupation certificate

15. Seal and signature of Commissioner

FORM-XV

(see clause 3.17.1(1), 7.1.6)

DETAILS TO BE CONTAINED IN THE CERTIFICATE OF STRUCTURAL SAFETY IN DESIGN (to be

provided by LICENSED STRUCTURAL ENGINEER)

1. Name and the address of the Applicant;

2. Particulars of the Plot;

3. Building license sanctioned date;

4. A statement, certifying that the structure of the building has been designed as per the relevant

standards satisfying the soil investigation report submitted by Licensed Professional and for the loads

expected on the building and that the building will be structurally safe if constructed accordingly.

FORM-XV A

(see clause 7.1.7.2)

DETAILS TO BE CONTAINED IN THE CERTIFICATE OF STRUCTURAL SAFETY IN CONSTRUCTION (to

be provided by Licensed Professional)

1. Name and the address of the Applicant;

2. Particulars of the Building site;

3. Building license sanctioned date;

4. A statement, certifying that the building is structurally safe and the construction is in accordance

with the specified designs and drawings provided by SER

FORM-XVI

(see clause 7.1.8.2)

DETAILS TO BE CONTAINED IN THE CERTIFICATE OF QUALITY CONTROL

1. Name and the address of the Applicant;

2. Particulars of the Plot;

3. Building licence sanctioned date;

294

4. Date of inspection;

5. Details of materials and other specifications inspected

6. written statement submitted by Building Quality Auditor (BQA) affirming that the building meets the

standard specification

FORM-XVII

(see Appendix IB)

FORMAT OF THE AFFIDAVIT / UNDERTAKING BY STAKEHOLDERS

AFFIDAVIT

(from Promoter)

We, M/s. ______________________, being represented by its _______________ Mr. ____________, S/o.

_____________aged ______ years, R/o. _____________________,[Aadhar No.____________________], being registered

as Promoter of the building/s under the regulations of building byelaws of Mangaluru City Corporation (MCC),

do hereby submit an undertaking Affidavit in favour of the Commissioner, Mangaluru City Corporation (MCC)

that;

1. We have applied for Building licence for the proposed construction of ___________________ consisting of

____________________comprised in _______________ situated at ___________, Mangaluru and MCC, vide

application No.________________.

2. We hereby declare and confirm that, we have studied the Building Byelaws, Zoning Regulations of Master

Plan and all other applicable laws related to the development of land and building.

3. We hereby authorise the Commissioner, MCC to enforce the terms and conditions of Building byelaws for

issuing the Building Licence and for the sanction of building plans. In case of any violations of the terms and

conditions of the sanctioned plan granted/permitted to us vide Building Licence No. __________________ dated

__________________, to initiate demolition proceedings in respect of the violated / deviated portion without any

intimation and if any such action is initiated by the commissioner, MCC for the violations committed by us,

we have no objection of whatsoever nature.

4. We hereby undertake to indemnify and keep harmless at all the time, MCC and its Commissioner / officers

/ employees against any litigation arising in future regarding the noncompliance of requirements under the

provisions of the Building byelaws, Zoning Regulations of Master Plan and all other Acts, Rules and

Regulations for the construction of the proposed buildings, as applicable and all other conditions laid down

while granting development permission and also towards the cost that will be incurred for the same by MCC

or its representatives.

5. We hereby further declare and confirm that in case the above information provided by us not to be true, we

shall be held personally responsible and be liable for punishment under the provisions of applicable Acts.

All the above is true.

295

DEPONENT

Solemnly affirmed and signed before me on this ______day of September 2023 at

___________

AFFIDAVIT

(From Professionals)

I,

Mr.

____________,

S/o.

_____________aged

______

years,

R/o.

_____________________,[Aadhar

No.____________________], being registered as Architect / Consulting Engineer under the regulations of building

byelaws of Mangaluru City Corporation (MCC), do hereby submit an undertaking Affidavit in favour of the

Commissioner, Mangaluru City Corporation (MCC) that;

1. I have been appointed as an Architect / a Consulting Engineer for the proposed construction of the building

on R.S._____________ at, __________Village of Mangaluru City Corporation and the Owner has applied for

Building

licence

for

the

proposed

construction

of

___________________

consisting

of

____________________comprised in _______________ situated at ___________, Mangaluru and MCC, vide

application No.________________.

2. We hereby declare and confirm that, we have studied the Building Byelaws, Zoning Regulations of Master

Plan and all other applicable laws related to the development of land and building.

3. We hereby authorise the Commissioner, MCC to enforce the terms and conditions of Building byelaws for

issuing the Building Licence and for the sanction of building plans. In case of any violations of the terms and

conditions of the sanctioned plan granted/permitted to us vide Building Licence No. __________________ dated

__________________, to initiate demolition proceedings in respect of the violated / deviated portion without any

intimation and if any such action is initiated by the commissioner, MCC for the violations committed by us,

we have no objection of whatsoever nature.

4. We hereby undertake to indemnify and keep harmless at all the time, MCC and its Commissioner / officers

/ employees against any litigation arising in future regarding the noncompliance of requirements under the

provisions of the Building byelaws, Zoning Regulations of Master Plan and all other Acts, Rules and

Regulations for the construction of the proposed buildings, as applicable and all other conditions laid down

while granting development permission and also towards the cost that will be incurred for the same by MCC

or its representatives.

5. We hereby further declare and confirm that in case the above information provided by us not to be true, we

shall be held personally responsible and be liable for punishment under the provisions of applicable Acts.

All the above is true.

DEPONENT

296

Solemnly affirmed and signed before me on this ______day of September 2023 at

___________

FORM-XVIII

DETAILS TO BE CONTAINED IN THE APPLICATION FOR REGISTRATION OF PROFESSIONAL (PoR for

Drawing & Supervision and licensed Professional

(as specified by the Authority)

FORM-XIX

FORMAT OF AGREEMENT BETWEEN OWNER / PROMOTER AND PROFESSIONAL ON RECORD (for

Drawing & Supervision)

(as specified by the Authority)

FORM-XX

FORMAT OF LETTER OF CONSENT FROM PROFESSIONAL ON RECORD (for Drawing & Supervision)

(as specified by the Authority)

FORM - XXI

SPECIFICATIONS OF COMPONENTS OF BUILDING

The minimum specifications of the various components in different types of buildings shall be

specified along with the application for building licence, selected from the list mentioned herebelow

or specified separately.

Sl.

No.

Component of Building

Standard Specifications

Specification

for

the

building

1.

Foundation

Masonry / RCC / Others

2.

Superstructure

Fully RCC / Fully Masonry / RCC columns and

Masonry infill / others

3.

Roof

Tiles / RCC / Others

4.

Main Door Frame

Teak wood / Jungle wood / Aluminium / UPVC /

Steel / Concrete / Others

5.

Inside Door Frame

6.

Toilet Door Frame

7.

Main Door Shutter

8.

Inside Door Shutter

9.

Toilet Door Shutter

10.

Window Frame

11.

Window Shutter

12.

Flooring for common

areas*

13.

Flooring

for

specific

premises*

14.

Flooring for common

toilets *

297

15.

Flooring for toilets in

specific areas*

16.

Wall

cladding

for

common toilets*

17.

Wall cladding for toilets

in specific premises*

18.

Wall cladding for kitchen

19.

Wall cladding for other

areas (specify areas) *

Plumbing Fittings for

common toilets*

Sanitary

fittings

for

common toilets*

Plumbing Fittings for

toilets in specific areas*

Sanitary

fittings

for

toilets in specific areas*

Ceiling painting in Car

Parking areas

Ceiling

painting

in

Common areas

Ceiling

painting

in

Specific areas

wall painting in Car

Parking areas

wall painting in Common

areas

wall painting in Specific

areas

Yard Pavement works

Lift

Transformer

Not Applicable / Applicable (if applicable, details to

be annexed)

Generator

Not Applicable / Applicable (if applicable, details to

be annexed)

Water Source

Sewerage System

Fire Fighting System

Not Applicable / Applicable (if applicable, details of

NOC)

Green cover and tree

plantation

Not Applicable / Applicable (if applicable, details to

be annexed)

Rainwater

harvesting

system

Not Applicable / Applicable (if applicable, details to

be annexed)

Low water consumption

plumbing fixtures

Not Applicable / Applicable (if applicable, details to

be annexed)

Wastewater

treatment

and reuse

Not Applicable / Applicable (if applicable, details to

be annexed)

Reduction of Hardscape

Not Applicable / Applicable (if applicable, details to

be annexed)

Solar

water

heating

system

Provided (if provided, details to the annexed / Not

provided (if not provided, details of alternate hot

water system provided and the details of additional

PV panels provided have to be specified and

annexed)

298

Solar Photovoltaic panels

Not Applicable / Applicable (if applicable, details to

be annexed)

Low energy consumption

electrical fixtures

Not Applicable / Applicable (if applicable, details to

be annexed)

Energy

efficiency

in

HVAC systems

Not Applicable / Applicable (if applicable, details to

be annexed)

Lighting

of

common

areas by LED devices

Not Applicable / Applicable (if applicable, details to

be annexed)

Solid waste management

Not Applicable / Applicable (if applicable, details to

be annexed)

Compliance with ECBC

norms

Not Applicable / Applicable (if applicable, details to

be annexed)

Construction

&

demolition

waste

management

Not Applicable / Applicable (if applicable, details to

be annexed)

Additional

Specifications**

Specification has to be specified for the respective

component

Note: 1. In case of ‘others’, the specification has to be clearly mentioned.

2. ‘*’ if specifications are different for different areas of the building, details have to be specified

separately.

3. ‘**’ in case of additional specifications for common areas of the building or specific premises,

details have to be specified separately.

( Ravichandra Naik, K.A.S )

Commissioner

Mangaluru City Corporation

ªÀÄÄzÀæPÀgÀÄ ºÁUÀÆ ¥ÀæPÁ±ÀPÀgÀÄ : ¸ÀAPÀ®£Á¢üPÁjUÀ¼ÀÄ, PÀ£ÁðlPÀ gÁdå¥ÀvÀæ, ¸ÀPÁðj «¨sÁVÃAiÀÄ ªÀÄÄzÀæuÁ®AiÀÄ, ªÉÄʸÀÆgÀÄ.

R.N.I. No. KARBIL/2001/47147 POSTAL REGN. No. RNP/KA/BGS/2202/2017-19

Licensed to post without prepayment WPP No. 297

VIJAY NELAMANGALA

MUNIDALAPPA

Digitally signed by VIJAY NELAMANGALA MUNIDALAPPA

DN: c=IN, o=E-PROCUREMENT CELL CEG,

2.5.4.20=588b7cb3fea32bf043f61231865669529a569e29a3f077a76878b32da

7621141, postalCode=560001, st=Karnataka,

serialNumber=f89f88df29205bfdf422120f4c1e04f3323d5c514a0b37a32da5a4

09b8c06019, cn=VIJAY NELAMANGALA MUNIDALAPPA

Date: 2025.03.18 17:58:42 +05'30'