(1)

ϝೇಷ ªಾಜÍ ಪĦΐೆ

GOVERNMENT OF KARNATAKA

No. UDD/138/MYAP/2023 Karnataka Government Secretariat

Vikasa soudha,

Dr. B. R. Ambedkar Veedhi,

Bangalore, Dated: 21.02.2026.

NOTIFICATION-I

The draft of the following Bye-laws further to amend the Karnataka

Municipal Corporations Model Building Bye-Laws, 2017 which the

Government of Karnataka proposes to make in exercise of the powers

conferred by section 426, sub-section (1) of section 428 and clause (b) of sub-

section (1) of section 508 of the Karnataka Municipal Corporations Act, 1976

(Karnataka Act 14 of 1977) was published in the State Gazette Vide

Notification No.UDD/138/MYAP/2023 in Part 4A of the Karnataka Gazette

inviting objections and suggestions from all persons likely to be affected

thereby within thirty days from the date of its publications in the Official

Gazette.

And whereas the said Gazette was made available to public on 25th

April 2025 and no objections and suggestions have been received.

Now therefore, in exercise of powers conferred under section 426, sub-

section (1) of section 428 and clause (b) of sub-section (1) of section 508 of

the Karnataka Municipal Corporations Act, 1976 (Karnataka Act 14 of 1977)

the State Government notifies the following Bye-Laws namely.

MODEL BUILDING BYE-LAWS

1. Title and commencement:- (1) These bye laws may be called the

Karnataka Municipal Corporations Model Building (Amendment) Bye-

Laws, 2026.

¨sÁUÀ – 4ಎ

Part – IVA

, 21

, 2026

, 02

)

BENGALURU, SATURDAY, 21, FEBRUARY, 2026 ( PHALGUNA , 02, SHAKAVARSHA, 1947)

. 169

No. 169

2

(2) They shall come into force from the date of their final publication in

the official Gazette

2. Amendment of Bye-law 15:- In the Karnataka Municipal Corporations

Model Building Bye-Laws, 2017, in bye-law15,-

(i)

In clause 15.1.2, the following shall be inserted at the end, namely:-

“15.1.2.A Application of sewage management provisions: (1) The

Provisions of sewage management shall be applicable for projects

involving construction of buildings, having built up area > 5000 sqm and

to new building projects and expansion or repair of the old or existing

buildings.

(2) The provisions shall not substitute any approvals or consent or

permissions etc., required to be obtained under any other Act or Rules or

regulations or bye-laws or notification etc made there under. The project

Authority shall continue to be under obligation to obtain approvals or

clearances under any other Acts or Regulations or Status of the Central

or State Government or their designated authorities or development

authority or Local authorities or Bodies as applicable to the project

including, in respect of site Location for parameters such as low lying

area, natural drainage, and for environment sensitivity i.e., proximity or

within the Eco Sensitive Area, Zonal Master Plan, Wildlife Sanctuary,

National Park, Coastal Regulation Zone areas, Biosphere Reserves,

Critically Polluted Area, hill areas or disaster prone areas.

(3) In case of any inconsistency with any other rules, regulations, bye-

laws, etc., the provisions that are more stringent shall apply.

(4) Management of sewage or waste water, re-use and recycle of treated

waste water by dual plumbing system shall be as under,-

a. Dual Plumbing System shall be implemented, where one shall be

used for supplying fresh water for drinking, cooking, bathing etc.

and another for supply of treated water for flushing;

b. Only treated water shall be used for flushing.

c. In no case, sewage or untreated waste water generated within the

project area shall be discharged through storm water drains or

otherwise into water bodies nor discharged or injected into the

ground water by any mode; and

d. The project authority may opt or avail to common off-site

treatment facility, as feasible, for treatment with re-use & recycle

3

of corresponding quantity of treated water through the dual

plumbing system for flushing and other non-potable use.

ii.

In Table 15.1: Environmental Conditions for Building and Construction

(Building Category ‘1’:5000sq.m to < 20,000Sq.m)

(a) For serial No. 3(a) and the entries relating thereto, the following shall

be substituted, namely:-

3(a)

Onsite solid waste management facility

should be developed and a formal

contractual

arrangement

shall

be

ensured with authorized recyclers or

concerned

municipal

agency

for

disposal

of

all

non-biodegradable

waste.

(b) For serial No. 3(b) and the entries relating thereto, the following shall

be substituted, namely:-

3(b)

Where

there

is

no

alternate

arrangement

for

disposal

of

biodegradable waste, organic waste

composter or a vermin-culture pit with

a minimum capacity of 1.0 kg per day

or 150sqm of built-up area shall be

installed and operated.

(c) For serial No.4 and the entries relating thereto, the following shall be

substituted, namely:-

4.

Sewage

treatment plant

i. In areas where there is no

municipal sewage network

a. Onsite

Sewage

Treatment

Systems with capacity to treat

100% waste water shall be

installed

with

appropriate

tertiary treatment system with

disinfection for black & grey

water. Such treated water shall

be used with dual plumbing

4

system for flushing and other

non-portable use;

OR

b. In case of usage of septic tank,

only

black

water

shall

be

discharged into the septic tank.

Grey water shall be treated

through

natural

treatment

systems

or

other

secondary

treatment as feasible. Such

treated water shall be used with

dual

plumbing

system

for

flushing and other non-portable

use;

The excess treated water shall

conform to the general discharge

norms of the Central Pollution

Control Board or MoEF & CC.

ii. In area where there is municipal

sewage network.

a. Onsite

Sewage

Treatment

Systems with capacity to treat

100% waste water shall be

installed

with

appropriate

tertiary treatment system with

disinfection for black and grey

water. Such treated water shall

be used with dual plumbing

system for flushing and other

non-portable use;

OR

b. The

project

authority

or

developer may opt to discharge

only

black

water

in

such

municipal

sewage

network

subject to availability to trunk

sewer line. For this purpose, two

separate pipeline network-one

5

for black water discharge and

other for collection of grey water

shall be installed. Grey water

shall be treated through natural

treatment

systems

or

other

secondary treatment as feasible.

Such treated water shall be used

with dual plumbing system for

flushing and other non-potable

use;

(iii) In Table 15.2: Environmental Conditions for Building and Construction

(Building Category ‘2’ ≥ 20,000Sq.m to 50,000Sq.m

(a) For Serial No. 3(a) and the entries relating thereto, the following shall

be substituted, namely:-

3(a)

Onsite solid waste management facility

shall be developed and a formal

contractual

arrangement

shall

be

ensured with authorized recyclers or

concerned

municipal

agency

for

disposal

of

all

non-biodegradable

waste.

(b) For serial No: 3(b) and the entries relating thereto, the following shall

be substituted, namely:-

3(b)

Where

there

is

no

alternate

arrangement

for

disposal

of

biodegradable waste, an organic waste

composter or a vermin-culture pit with

a minimum capacity of 1.0 kg per day

or 150 sq.m of built-up area shall be

installed and operated.

(c) For serial No. 4 and the entries relating thereto, the following shall be

substituted, namely;-

4.

Sewage

treatment

plant.

1. Onsite Sewage Treatment Plant

with capacity to treat 100% waste

water generated within the project

area through tertiary treatment

6

shall be installed. Treated waste

water shall be reused on site for

landscape, flushing, HVAC, fire-

fighting, and other end-uses.

2. The

adequacy

of

the

Sewage

Treatment Plant (STP) shall be

certified by an independent expert

of sewage management and a

report in the regard shall be

submitted

to

the

authorized

agency.

3. Discharge of excess treated waste

water outside the premises: after

treatment in the sewage treatment

plant (STP), the treated water shall

meet the discharge standards as

notified by the Central Pollution

Control

Board

or

Ministry

of

Environment, Forest and Climate

Change, Government of India from

time to time.

4. Waste water and treated water

quantification

system

through

metering or sub-metering shall be

installed.

5. Sludge form the onsite sewage

treatment

shall

be

collected,

conveyed and disposed as per the

Central

Public

Health

and

Environment

Engineering

Organization (CPHEEO) Manual,

Ministry of Housing and Urban

Affair, on Sewerage and Sewage

Treatment Systems.

6. Where Common Sewage Treatment

Plan facility has been availed, it

shall be ensured that treated waste

water is recycled back to respective

building for reuse.

7

(iv) In Table 15.3,; Environmental Conditions for Building and Construction

(Building Category ‘3’ ≥ 50,000sq.m to 1,50,000 sq.m)

(a) For serial No. 3(a) and the entries relating thereto, the following shall

be substituted, namely:-

3(a)

Onsite solid waste management facility

shall be developed and a formal

contractual

arrangement

shall

be

ensured with authorized recyclers or

concerned

municipal

agency

for

disposal

of

all

non-biodegradable

waste.

(b) For serial No. 3(b) and the entries relating thereto, the following shall

be substituted, namely:-

3(b)

Where

there

is

no

alternate

arrangement

for

disposal

of

biodegradable waste, an Organic waste

composter or a vermin-culture pit with

a minimum capacity of 1.0 kg per day

150 sgm of built-up area shall be

installed and operated.

(c) For serial No. 4 and entries relating thereto, the following shall be

substituted, namely:-

4.

Sewage

Treatment

Plant

1. Onsite Sewage Treatment Plant

with capacity to treat 100% waste

water generated within the project

area through tertiary treatment

shall be installed. Treated waste

water shall be reused on site for

landscape, flushing, HVAC, fire-

fighting, and other and end-uses.

2. The

adequacy

of

the

Sewage

Treatment Plant (STP) shall be

certified by an independent expert

of sewage management and a

report in this regard shall be

8

submitted

to

the

authorized

agency.

3. Discharge of excess treated waste

water outside the premises: after

treatment in the Sewage Treatment

Plant STP, the treated water shall

meet the discharge standards as

notified by the Central Pollution

Control

Board

or

Ministry

of

Environment, Forest and Climate

Change, Government of India from

time to time

4. Waste water and treated water

quantification

system

through

metering or sub-metering shall be

installed.

5. Sludge form the onsite sewage

treatment

shall

be

collected,

conveyed and disposed as per the

Central

Public

Health

and

Environment

Engineering

Organization (CPHEEO) Manual,

Ministry of Housing and Urban

Affair, on Sewerage and Sewage

Treatment systems.

6. Where common Sewage Treatment

Plan facility has been availed, it

shall be ensured that treated waste

water is recycled back to respective

building for reuse.

By Order and in the name of the

Governor of Karnataka.

(LATHA.K)

Under Secretary to Government,

(Development Authority and NaYoSe)

Urban Development Department.

[

ಮುದÎಕರು ²ಾಗೂ ಪΐಾಶಕರು:- ಸಂಕಲ£ಾĩಾĸಗಳ…, ಕ£ಾಟಕ ªಾಜÍಪತÎ, ಸಾĸ ೇಂದÎ ಮುದΞಾಲಯ, ¦ೆಂಗಳˆರು

R.N.I. No. KARBIL/2001/47147 POSTAL REGN. No. RNP/KA/BGS/2202/2017-19

Licensed to post without prepayment WPP No. 297

THAMMAIAH

Digitally signed by THAMMAIAH

DN: c=IN, o=Centre for e-Governance,

2.5.4.20=be54f34f4e31eae50203ca7fab5ceb3794f20a8460a2582ef28294d43b8f8b16,

ou=department of printing stationery and Publication,CID - 7048443, postalCode=560001,

st=Karnataka,

serialNumber=4d9b284dcc53d39f1425f50485de07dd86efa302a3fce3729eddea0c1b5098e0,

cn=THAMMAIAH

Date: 2026.02.23 17:57:24 +05'30'