(1)

ϝೇಷ ªಾಜÍ ಪĦΐೆ

GOVERNMENT OF KARNATAKA

No. UDD/138/MYAP/2023 Karnataka Government Secretariat

Vikasa soudha,

Dr. B. R. Ambedkar Veedhi,

Bangalore, Dated: 21.02.2026

NOTIFICATION – II

The draft of the following Bye-Laws further to amend the Karnataka

Municipalities Model Building Bye-Laws, 2017 which the Government of

Karnataka proposes to make in exercise of the powers conferred by sub-

section (1) of section 325 of the Karnataka Municipalities Act, 1964

(Karnataka Act 22 of 1964) was published in the State Gazette Vide

Notification No.UDD/138/MYAP/2023 in Part 4A of the Karnataka Gazette

inviting objections and suggestions from all persons likely to be affected

thereby within thirty days from the date of its publications in the Official

Gazette.

And whereas the said Gazette was made available to public on 25th

April 2025 and whereas no objections and suggestions have been received.

Now therefore, in exercise of powers conferred under Sub-section (1) of

Section 325 of the Karnataka Municipalities Act, 1964 (Karnataka Act 22 of

1964) the State Government notifies the following Bye-Laws namely.

MODEL BUILDING BYE-LAWS

1. Title and commencement and applicability:- (1) These bye laws may

be called the Karnataka Municipalities Model Building (Amendment) Bye-

Laws, 2026.

(2) They shall come into force from the date of their final

publication in the official Gazette

¨sÁUÀ – 4ಎ

Part – IVA

, 21

, 2026

, 02

)

BENGALURU, SATURDAY, 21, FEBRUARY, 2026 ( PHALGUNA , 02, SHAKAVARSHA, 1947)

. 170

No. 170

2

2. Amendment of bye-law 15.- In the Karnataka Municipalities Model

Building Bye-Laws, 2017, in bye-law 15,-

(i)

In clause 15.1.2, the following shall be inserted at the end,

namely:-

“15.1.2.A Application of sewage management provisions: (1) The

provisions of sewage management shall be applicable for projects involving

construction of buildings, having built up area > 5000 sqm and to new

building projects and expansion or repair of the old or existing buildings.

(2) The provisions shall not substitute any approval or consent or

permission etc., required to be obtained under any other Act or rules or

regulation or bye-law or notification etc made there under. The project

authority shall continue to be under obligation to obtain approvals or

clearances under any other Act or regulations or statutes of the Central or

State Government or their designated authorities or development authority

or Local authorities or Bodies as applicable to the project, including, in

respect of site location for parameters such as low lying area, natural

drainage and for environment sensitivity i.e, proximity or within the Eco

Sensitive Area, Zonal Master Plan, Wildlife Sanctuary, National Park, Coastal

Regulation Zone area, Biosphere Reserve, Critically Polluted Area, hill area

or disaster prone area.

(3) In case of any inconsistency with any other rules, regulations, bye-

laws, etc., the provisions that are more stringent shall apply.

(4) Management of sewage or waste water, re-use and recycle of treated

waste water by dual plumbing system shall be as under,-

a. Dual Plumbing System shall be implemented, where one shall be used

for supplying fresh water for drinking, cooking, bathing etc. and

another for supply of treated water for flushing;

b. Only treated water shall be used for flushing.

c. In no case, sewage or untreated waste water generated within the

project area shall be discharged through storm water drains or

otherwise into water bodies nor shall be discharged or injected into the

ground water by any mode; and

d. The project authority may opt or avail to common off-site treatment

facility, as feasible, for treatment with re-use & recycle of

corresponding quantity of treated water through the dual plumbing

system for flushing and other non-potable use.

(ii)

In Table 15.1: Environmental Conditions for Building and

Construction (Building Category ‘1’: 5000 Sq.m to < 20,000 Sq.m)

3

(a) For serial No. 3(a) and the entries relating thereto, the following

shall be substituted, namely:-

3(a)

Onsite solid waste management facility

shall be developed and a formal

contractual

arrangement

shall

be

ensured with authorized recyclers or

concerned

municipal

agency

for

disposal

of

all

non-biodegradable

waste.

(b) For serial No. 3(b) and the entries relating thereto, the following

shall be substituted, namely:-

3(b)

Where

there

is

no

alternate

arrangement

for

disposal

of

biodegradable waste, an organic waste

composter or a vermin-culture pit with

a minimum capacity of 1.0 kg per day

or 150 sqm of built-up area shall be

installed and operated.

(c) For serial No. 4 and the entries relating thereto, the following

shall be substituted, namely:-

4.

Sewage

treatment

plant.

(i) In

areas

where

there

is

no

municipal sewage network:

(a) Onsite sewage treatment systems

with capacity to treat 100% waste

water shall be installed with

appropriate

tertiary

treatment

system with disinfection for black

and grey water. Such treated

water shall be used with dual

plumbing system for flushing and

other non-portable use;

OR

(b) In case of usage of septic tank,

only

black

water

shall

be

discharged into the septic tank.

4

Grey

water

shall

be

treated

through

natural

treatment

systems

or

other

secondary

treatment

as

feasible.

Such

treated water shall be used with

dual

plumbing

systems

for

flushing and other non-portable

use;

The excess treated water shall

conform to the general discharge

norms of the Central Pollution

Control Board or MoEF and CC.

(ii)

In

area

where

there

is

municipal sewage network.

(c) Onsite sewage treatment systems

with capacity to treat 100% waste

water shall be installed with

appropriate

tertiary

treatment

system with disinfection for black

and grey water. Such treated

water shall be used with dual

plumbing system for flushing and

other non-portable use;

OR

(d) The project authority or developed

may opt to discharge only black

water in such municipal sewage

network subject to availability to

trunk sewer line. For this purpose,

two separate pipeline network- one

for black water discharge and

other for collection of grey water

shall be installed. Grey water shall

be

treated

through

natural

treatment

systems

or

other

secondary treatment as feasible.

5

Such treated water shall be used

with dual plumbing system for

flushing and other non-portable

use;

(iii)

In Table 15.2: Environmental Conditions for Building and

construction (Building Category ‘2’ ≥ 20,000 Sq.m to 50,000 Sq.m)

(a) For serial No. 3(a) and the entries relating thereto, the following shall

be substituted, namely:-

3(a)

Onsite solid waste management facility

shall be developed and a formal

contractual

arrangement

shall

be

ensured with authorized recyclers or

concerned

municipal

agency

for

disposal

of

all

non-biodegradable

waste.

(b) For serial No. 3(b) and the entries relating thereto, the following shall

be substituted, namely:-

3(b)

Where

there

is

no

alternate

arrangement

for

disposal

of

biodegradable waste, an Organic waste

composter or a vermin-culture pit with

a minimum capacity of 1.0 kg per day

or 150sqm of built-up area shall be

installed and operated.

(c) For serial No. 4 and the entries relating thereto, the following shall be

substituted, namely:-

4.

Sewage

treatment

plant.

i. Onsite Sewage Treatment Plant with

capacity to treat 100% waste water

generated within the project area

through tertiary treatment shall be

reused

on

site

for

landscape,

flushing, HVAC, fire-fighting and

other end-uses.

6

ii. The

adequacy

of

the

sewage

treatment plant (STP) shall be

certified by an independent expert of

sewage management and a report in

this regard shall be submitted to the

authorized agency.

iii. Discharge of excess treated waste

water outside the premises: after

treatment in the sewage treatment

plant (STP), the treated water shall

meet the discharge standards as

notified by the Central Pollution

Control

Board

or

Ministry

of

Environment, Forest and Climate

Change, Government of India from

time to time.

iv. Waste water and treated water

quantification

system

through

metering or sub-metering shall be

installed.

v. Sludge form the onsite sewage

treatment

shall

be

collected,

conveyed and disposed as per the

Central

Public

Health

and

Environment

Engineering

Organization

(CPHEEO)

Manual,

Ministry of Housing and Urban

Affair, on Sewerage and Sewage

Treatment Systems.

vi. Where Common Sewage Treatment

Plan Facility has been availed, it

shall be ensured that treated waste

water is recycled back to respective

building for reuse.

(iv) In Table 15.3,- Environmental Conditions for Building and Construction

(Building Category ‘3’ ≥ 50,000 sq.m to 1,50,000 Sq.m)

(a) For serial No. 3(a) and the entries relating thereto, the following shall

be substituted, namely:-

7

3(a)

Onsite solid waste management facility

shall

be

developed

and

a

formal

contractual arrangement shall be ensured

with authorized recyclers or concerned

municipal agency for disposal of all non-

biodegradable waste.

(b) For serial No. 3(b) and the entries relating thereto, the following shall

be substituted, namely:-

3(b)

Where

there

is

no

alternate

arrangement

for

disposal

of

biodegradable waste, an Organic waste

composter or a vermin-culture pit with

a minimum capacity of 1.0 kg per day

or 150sqm of built-up area shall be

installed and operated.

(c) For serial No. 4 and entries relating thereto, the following shall be

substituted, namely:-

4.

Sewage treatment

plant.

(i) Onsite Sewage Treatment Plant

with capacity to treat 100% waste

water generated within the project

area through tertiary treatment

shall be installed. Treated waste

water shall be reused on site for

landscape, flushing, HVAC, fire-

fighting and other end-uses.

(ii) The

adequacy

of

the

sewage

treatment plant (STP) shall be

certified by an independent expert

of sewage management and a

report in this regard shall be

submitted

to

the

authorized

agency.

(iii) Discharge of excess treated waste

water outside the premises: after

treatment in the sewage treatment

plant (STP), the treated water shall

meet the discharge standards as

notified by the Central Pollution

8

Control

Board

or

Ministry

of

Environment, Forest and Climate

Change, Government of India from

time to time.

(iv) Waste water and treated water

quantification

system

through

metering or sub-metering shall be

installed.

(v) Sludge form the onsite sewage

treatment

shall

be

collected,

conveyed and disposed as per the

Central

Public

Health

and

Environment

Engineering

Organization (CPHEEO) Manual,

Ministry of Housing and Urban

Affair, on Sewerage and Sewage

Treatment Systems.

(vi) Where Common Sewage Treatment

Plan Facility has been availed, it

shall be ensured that treated waste

water is recycled back to respective

building for reuse.

By Order

By order and the name of the

Governor of Karnataka.

(LATHA.K)

Under Secretary to Government

(Development Authority and NaYoSe)

Urban Development Department.

[

ಮುದÎಕರು ²ಾಗೂ ಪΐಾಶಕರು:- ಸಂಕಲ£ಾĩಾĸಗಳ…, ಕ£ಾಟಕ ªಾಜÍಪತÎ, ಸಾĸ ೇಂದÎ ಮುದΞಾಲಯ, ¦ೆಂಗಳˆರು

R.N.I. No. KARBIL/2001/47147 POSTAL REGN. No. RNP/KA/BGS/2202/2017-19

Licensed to post without prepayment WPP No. 297

THAMMAIAH

Digitally signed by THAMMAIAH

DN: c=IN, o=Centre for e-Governance,

2.5.4.20=be54f34f4e31eae50203ca7fab5ceb3794f20a8460a2582ef28294d43b8f8b16, ou=department of printing

stationery and Publication,CID - 7048443, postalCode=560001, st=Karnataka,

serialNumber=4d9b284dcc53d39f1425f50485de07dd86efa302a3fce3729eddea0c1b5098e0, cn=THAMMAIAH

Date: 2026.02.23 17:59:02 +05'30'