(641)

¨sÁUÀ 1

gÁdå ¸ÀPÁðgÀzÀ ªÀÄÄRå DzÉñÀUÀ¼ÀÄ ºÁUÀÆ ¸ÀÄvÉÆÛÃ¯É ªÀÄÄAvÁzÀ

J¯Áè E¯ÁSÉUÀ½UÀÆ ¸ÀA§A¢ü¹zÀ DzÉñÀUÀ¼ÀÄ

COMMERCE AND INDUSTRIES SECRETARIAT

Sub

:

Proposal of M/s. Leadage Metals Ltd., - to establish ``Smelting & Refining of

Lead Unit'' at Vemgal Industrial Area, Kolar District – Reg.

Ref

:

Proceedings of the 33rd State High Level Clearance Committee (SHLCC)

meeting held on 19.11.2013.

PREAMBLE:

M/s. Leadage Metals Ltd., has proposed to establish ``Smelting & Refining of Lead Unit'', with an investment of Rs. 80.52

crore, generating employment to about 205 persons at Vemgal Industrial Area, Kolar District.

The proposal was examined in the 33rd State High Level Clearance Committee (SHLCC) Meeting held on

19.11.2013.Government has examined the recommendations made by the State High Level Clearance Committee, in all aspects.

Hence the following order.

GOVERNMENT ORDER No. CI 9 SPI 2014, BANGALORE, DATED: 03.01.2014

Government is pleased to accord in principle approval to the investment proposal of M/s. Leadage Metals Ltd., to establish

``Smelting & Refining of Lead Unit'', with an investment of Rs. 80.52 crore at Vemgal Industrial Area, Kolar District, generating

employment to about 205 persons with the following infrastructure facilities, incentives and concessions:

Land :

KIADB to allot 12 acres of land at Vemagal Industrial Area, Kolar District

Power:

4187 KVA from BESCOM.

Water:

85000 LPD form KIADB/Rain water harvesting/Own source/Recycled water

Incentives &

Concessions:

The unit is eligible to avail incentives and concessions as per the applicable

Industrial Policy of the state.

Sanction of the above infrastructure facilities, incentives and concessions is subject to the following terms and conditions:

1. Environment : The company to obtain Consent for Establishment and Consent for Operation from KSPCB and

environmental clearance from MoEF, Govt. of India or the Dept of Forest, Ecology & Environment, Govt. of Karnataka, if

applicable.

2. Employment : The Company shall comply with the provisions of Industrial Policy of Govt. of Karnataka and Dr. Sarojini

Mahishi Report,. Prepare a plan for development of Human Resources required for the project, train local people. A copy

of Human Resources Development plan shall be sent to the Commissioner for Industrial Development & Director of

Industries and Commerce for monitoring.

¸ÀA¥ÀÄl 149

Volume 149

¨ÉAUÀ¼ÀÆgÀÄ, UÀÄgÀĪÁgÀ, K¦æ¯ï 17, 2014 (ZÉÊvÀæ 27, ±ÀPÀ ªÀµÀð 1936)

Bangalore, Thursday, April 17, 2014 (Chaithra 27, Shaka Varsha 1936)

¸ÀAaPÉ 16

Issue 16

PÀ£ÁðlPÀ gÁdå¥ÀvÀæ, UÀÄgÀĪÁgÀ, K¦æ¯ï 17, 2014

¨sÁUÀ 1

642

3. Vendor Development : Wherever there is scope for vendor development for the project, the company shall prepare a

vendor development plan, develop local vendors and procure the required inputs, components and sub-assemblies from

these local vendor units. A copy of the vendor development plan shall be sent to the Commissioner for Industrial

Development & Director of Industries and Commerce for monitoring.

4. Social Infrastructure Development : The Company is advised to take up social infrastructure development projects in

the vicinity of the proposed location of the unit and comply with the stipulation of Company Act 2013. A copy of such

projects shall be sent to the Commissioner for Industrial Development & Director of Industries and Commerce for

monitoring.

5. Others :

a)

The company shall adopt rainwater harvesting, waste water recycling and water conservation techniques. Zero

discharge facility should be adopted wherever applicable.

b)

The company shall take all statutory and other necessary clearances from the competent authorities including Govt.

of India and shall submit milestones/progress in the implementation of the project regularly, which will be monitored

by the Department.

This approval is valid for a period of two years from the date of issue of this Government Order.

PR 257

By Order and in the name of the Governor of Karnataka,

S. UMADEVI,

Desk Officer (Technical Cell),

Commerce and Industries Department.

COMMERCE AND INDUSTRIES SECRETARIAT

Sub

:

Proposal of M/s. TMEIC Industrial Systems India Pvt. Ltd., - to establish

``Rotating Motors and Power Electrical equipments Manufacturing Unit'' at

Vasantha Narasapur Industrial Area, Tumkur Taluk, Tumkur District- Reg.

Ref

:

Proceedings of the 33rd State High Level Clearance Committee (SHLCC)

meeting held on 19.11.2013.

PREAMBLE:

M/s. TMEIC Industrial Systems India Pvt. Ltd., - has proposed to establish a ``Rotating Motors and Power Electrical

equipments Manufacturing Unit'' with an investment of Rs. 250.00 crore, generating employment to about 548 persons at Vasantha

Narasapur Industrial Area, Tumkur Taluk, Tumkur District

The proposal was examined in the 33rd State High Level Clearance Committee (SHLCC) Meeting held on

19.11.2013.Government has examined the recommendations made by the State High Level Clearance Committee, in all aspects.

Hence the following order.

GOVERNMENT ORDER No. CI 10 SPI 2014, BANGALORE, DATED: 03.01.2014

Government is pleased to accord in principle approval to the investment proposal of M/s. TMEIC Industrial Systems India Pvt.

Ltd., to establish a ``Rotating Motors and Power Electrical Equipments Manufacturing Unit'' with an investment of Rs. 250.00 crore, at

Vasantha Narasapur Industrial Area, Tumkur Taluk, Tumkur District generating employment to about 548 persons with the following

infrastructure facilities, incentives and concessions:

Land :

KIADB to allot 15 acres of land at Vasantha Narasapur Industrial Area, Tumkur

District

Power:

4000 KVA from BESCOM.

Water:

60 KLPD form KIADB

Incentives &

Concessions:

The unit is eligible to avail incentives and concessions as per the applicable

Industrial Policy of the state.

Sanction of the above infrastructure facilities, incentives and concessions is subject to the following terms and conditions:

1. Environment : The company to obtain Consent for Establishment and Consent for Operation from KSPCB and

environmental clearance from MoEF, Govt. of India or the Dept of Forest, Ecology & Environment, Govt. of Karnataka, if

applicable.

2. Employment : The Company shall comply with the provisions of Industrial Policy of Govt. of Karnataka and Dr. Sarojini

Mahishi Report,. Prepare a plan for development of Human Resources required for the project, train local people. A copy

¨sÁUÀ 1

PÀ£ÁðlPÀ gÁdå¥ÀvÀæ, UÀÄgÀĪÁgÀ, K¦æ¯ï 17, 2014

643

of Human Resources Development plan shall be sent to the Commissioner for Industrial Development & Director of

Industries and Commerce for monitoring.

3. Vendor Development : Wherever there is scope for vendor development for the project, the company shall prepare a

vendor development plan, develop local vendors and procure the required inputs, components and sub-assemblies from

these local vendor units. A copy of the vendor development plan shall be sent to the Commissioner for Industrial

Development & Director of Industries and Commerce for monitoring.

4. Social Infrastructure Development : The Company is advised to take up social infrastructure development projects in

the vicinity of the proposed location of the units. A copy of such projects shall be sent to the Commissioner for Industrial

Development & Director of Industries and Commerce for monitoring.

5. Others :

a)

The company shall adopt rainwater harvesting, waste water recycling and water conservation techniques. Zero

discharge facility should be adopted wherever applicable.

b)

The company shall take all statutory and other necessary clearances from the competent authorities including Govt.

of India and shall submit milestones/progress in the implementation of the project regularly, which will be monitored

by the Department.

This approval is valid for a period of two years from the date of issue of this Government Order.

PR 258

By Order and in the name of the Governor of Karnataka,

S. UMADEVI,

Desk Officer (Technical Cell),

Commerce and Industries Department.

COMMERCE AND INDUSTRIES SECRETARIAT

Sub

:

Proposal of M/s. Volvo India Pvt. Ltd., - to establish ``Commercial Vehicles

Manufacturing Unit'' at Sonnenyakanahalli, Malur Taluk, Kolar District- Reg.

Ref

:

Proceedings of the 33rd State High Level Clearance Committee (SHLCC)

meeting held on 19.11.2013.

PREAMBLE:

M/s.Volvo India Pvt. Ltd., has proposed to establish a ``Commercial Vehicles (Truckas & Buses) Manufacturing Unit'' with an

investment of Rs. 974.00 crore, generating employment to about 2125 persons at Sonnenyakanahalli, Malur Taluk, Kolar District.

The proposal was examined in the 33rd State High Level Clearance Committee (SHLCC) Meeting held on

19.11.2013.Government has examined the recommendations made by the State High Level Clearance Committee, in all aspects.

Hence the following order.

GOVERNMENT ORDER No. CI 11 SPI 2014, BANGALORE, DATED: 03.01.2014

Government is pleased to accord in principle approval to the investment proposal of M/s Volvo India Pvt. Ltd., to establish a

``Commercial Vehicles (Trucks & Buses) Manufacturing Unit'', with an investment of Rs. 974.00 crore at Sonnenyakanahalli, Malur

Taluk, Kolar District, generating employment to about 2125 persons with the following infrastructure facilities, incentives and

concessions:

Land :

90 acres of land in the following Sy. Nos. to be acquired and allotted through

KIADB as SUC (80% consent) or to be purchased U/s 109 of KLR Act and

conversion of the same, subject to the approval of Hosakote Planning Authority

wherever applicable.

Sonnenayakanahalli, Malur Taluk - 69 acres in various Sy.Nos. 33/P 1, 33/P2,

33/P3, 33/P4, 33/P5, 33/P6, 33/P7, 33/P8, 33/P9, 33/P10, 33/P11, 33/P12,

33/P13, 33/P14,33/P15, 33/P16, 33/P17, 33/P18, 33/P19, 57, 58, 59, 62, 63,

64, 65, 66 and

Manchappanahalli, Hoskote Taluk - 21 acres in various Sy.Nos. 114/Pl,

114/P2, 114/P2/P1, 114/P3, 114/P4, 114/P5, 114/P6, 114/P7, 114/P8, 114/P9,

114/P10, 114/P11, 114/P12, 114/P13, 114/P14, 114/P15, 114/P16.

Power:

1200 KVA from BESCOM.

Water:

12 Lakhs LPD from own source

Incentives &

Concessions:

The unit is eligible to avail incentives and concessions as per the applicable

Industrial Policy of the state.

PÀ£ÁðlPÀ gÁdå¥ÀvÀæ, UÀÄgÀĪÁgÀ, K¦æ¯ï 17, 2014

¨sÁUÀ 1

644

Sanction of the above infrastructure facilities, incentives and concessions is subject to the following terms and conditions:

1. Environment : The company to obtain Consent for Establishment and Consent for Operation from KSPCB and

environmental clearance from MoEF, Govt. of India or the Dept of Forest, Ecology & Environment, Govt. of Karnataka, if

applicable.

2. Employment : The Company shall comply with the provisions of Industrial Policy of Govt. of Karnataka and Dr. Sarojini

Mahishi Report,. Prepare a plan for development of Human Resources required for the project, train local people. A copy

of Human Resources Development plan shall be sent to the Commissioner for Industrial Development & Director of

Industries and Commerce for monitoring.

3. Vendor Development : Wherever there is scope for vendor development for the project, the company shall prepare a

vendor development plan, develop local vendors and procure the required inputs, components and sub-assemblies from

these local vendor units. A copy of the vendor development plan shall be sent to the Commissioner for Industrial

Development & Director of Industries and Commerce for monitoring.

4. Social Infrastructure Development : The Company is advised to take up social infrastructure development projects in

the vicinity of the proposed location of the unit and comply with the stipulation of Company Act 2013. A copy of such

projects shall be sent to the Commissioner for Industrial Development & Director of Industries and Commerce for

monitoring.

5. Others :

a)

The company shall adopt rainwater harvesting, waste water recycling and water conservation techniques. Zero

discharge facility should be adopted wherever applicable.

b)

The company shall take all statutory and other necessary clearances from the competent authorities including Govt.

of India and shall submit milestones/progress in the implementation of the project regularly, which will be monitored

by the Department.

This approval is valid for a period of two years from the date of issue of this Government Order.

PR 259

By Order and in the name of the Governor of Karnataka,

S. UMADEVI,

Desk Officer (Technical Cell),

Commerce and Industries Department.

DgÉÆÃUÀå ªÀÄvÀÄÛ PÀÄlÄA§ PÀ¯Áåt ¸ÀaªÁ®AiÀÄ

«µÀAiÀÄ: ¸ÀPÁðj DAiÀÄĪÉÃðzÀ ªÉÊzÀåQÃAiÀÄ ªÀĺÁ«zÁå®AiÀÄ, ªÉÄʸÀÆgÀÄ E°è£À G¥À£Áå¸ÀPÀgÀÄUÀ¼À

¥Àj«ÃPÀëuÁ CªÀ¢üAiÀÄ£ÀÄß WÉÆÃ¶¸ÀĪÀ §UÉÎ.

NzÀ¯ÁVzÉ:

1.

DAiÀÄÄµï ¤zÉÃð±ÀPÀgÀ ¥ÀvÀæ ¸ÀASÉå/63/¹§âA¢ (1)/2013-14, ¢£ÁAPÀ 24-01-2014.

2.

C¢ü¸ÀÆZÀ£É ¸ÀASÉå : DPÀÄPÀ 110 ¦nr 2009, ¢£ÁAPÀ 22-07-2011.

¥Àç¸ÁÛªÀ£É:

ªÉÄÃ¯É NzÀ¯ÁzÀ ¥ÀvÀæzÀ°è, ¤zÉÃð±ÀPÀgÀÄ, DAiÀÄĵï E¯ÁSÉ EªÀgÀÄ DAiÀÄĵï£À ««zsÀ ¸ÀPÁðj ªÉÊzÀåQÃAiÀÄ ªÀĺÁ«zÁå®AiÀÄUÀ¼À°è

UÀÄwÛUÉ DzsÁgÀzÀ ªÉÄÃ¯É PÀvÀðªÀå ¤ªÀð»¸ÀÄwÛzÀÝ 56 d£À G¥À£Áå¸ÀPÀgÀÄUÀ¼À ¸ÉêÉAiÀÄ£ÀÄß ¸ÀPÁðgÀzÀ C¢ü¸ÀÆZÀ£É ¸ÀASÉå : DPÀÄPÀ 110 ¦nr

2009, ¢£ÁAPÀ 22-07-2011 gÀ£ÀéAiÀÄ ¸ÀPÀæªÀÄUÉÆ½¸À¯ÁVzÀÄÝ, EzÀgÀ°è ªÉÄʸÀÆj£À ¸ÀPÁðj DAiÀÄĪÉÃðzÀ ªÉÊzÀåQÃAiÀÄ ªÀĺÁ«zÁå®AiÀÄzÀ°è

PÀvÀðªÀå ¤ªÀð»¸ÀÄwÛgÀĪÀ 13 d£À G¥À£Áå¸ÀPÀgÀÄUÀ¼ÁzÀ qÁ|| ¸ÀĪÀÄ£ï, qÁ|| ªÀĪÀÄvÁ²æÃ J¸ï, qÁ|| «dAiÀÄ®Qëöä eÉ.ºÉZï, qÁ|| DzÀ±Àð

J¸ï.f., qÁ|| ¸ÀAdAiÀÄ PÀĪÀiÁgï JA.r., qÁ|| ªÁ¸ÀÄzÉêÀ D£ÀAzÀgÁªï ZÁmÉ, qÁ|| gÁdÄ f. PÀÄgÀtÂ, qÁ|| £À½¤ J£ï., qÁ|| £ÁUÉñï

ºÉZï.r., qÁ|| CgÀ«Azï AiÀiÁzÀªï. J¸ï., qÁ|| ªÀÄĸÀÛPï CºÀªÀÄzï £ÉUÀ¼ÀÆgÀÄ, qÁ|| D£ÀAzÀ PÀnÖ ªÀÄvÀÄÛ qÁ|| C£ÀÄgÀÆ¥À ºÉZï.PÉ. EªÀgÀÄUÀ¼ÀÄ

¢£ÁAPÀ 26-07-2011 gÀAzÀÄ CªÀgÀÄUÀ¼ÀÄ DAiÉÄÌAiÀiÁVgÀĪÀ G¥À£Áå¸ÀPÀgÀ ºÀÄzÉÝAiÀÄ ¸ÉêÉUÉ ºÁdgÁVzÀÄÝ, CªÀgÀ ¥ÀjÃPÁëxÀð CªÀ¢üAiÀÄÄ

¢£ÁAPÀ 25.07.2013 gÀAzÀÄ C¥ÀgÁºÀß ªÀÄÄPÁÛAiÀĪÁVgÀÄvÀÛzÉAzÀÄ, F J¯Áè G¥À£Áå¸ÀPÀgÀÄUÀ¼ÀÄ ºÀÄzÉÝUÉ ¤UÀ¢¥Àr¹gÀĪÀ E¯ÁSÁ ¥ÀjÃPÉëUÀ¼À£ÀÄß

¥Á¸ÀÄ ªÀiÁrzÀÄÝ, EªÀgÀÄUÀ¼À JgÀqÀÄ ªÀµÀðUÀ¼À PÁAiÀÄð¤ªÀðºÀuÁ ªÀgÀ¢UÀ¼À°è AiÀiÁªÀÅzÉà ¥ÀæwPÀÆ® µÀgÁUÀ¼ÀÄ E®èªÉAzÀÄ ºÁUÀÆ AiÀiÁªÀÅzÉÃ

E¯ÁSÁ «ZÁgÀuÉ EgÀĪÀÅ¢®èªÉA§ÄzÀ£ÀÄß zÀÈrüÃPÀj¸ÀÄvÁÛ, ¸ÀzÀj G¥À£Áå¸ÀPÀgÀÄUÀ¼À SÁAiÀÄA¥ÀƪÀð CªÀ¢üAiÀÄ£ÀÄß vÀȦÛPÀgÀªÉAzÀÄ WÉÆÃ¶¸ÀĪÀ

§UÉÎ ¸ÀPÁðgÀzÀ ºÀAvÀzÀ°è ¤tðAiÀÄ vÉUÉzÀÄPÉÆ¼ÀÄîªÀAvÉ PÉÆÃj ¥Àæ¸ÁÛªÀ£ÉAiÀÄ£ÀÄß ¸À°è¹gÀÄvÁÛgÉ.

ªÉÄÃ¯É PÀæªÀĸÀASÉå (2) gÀ°è NzÀ¯ÁzÀ C¢ü¸ÀÆZÀ£ÉAiÀİè DAiÀÄĵï£À ««zsÀ ¸ÀPÁðj ªÉÊzÀåQÃAiÀÄ ªÀĺÁ«zÁå®AiÀÄUÀ¼À°è UÀÄwÛUÉ

DzsÁgÀzÀ ªÉÄÃ¯É PÁAiÀÄ𠤪Àð»¸ÀÄwÛzÀÝ 56 d£À G¥À£Áå¸ÀPÀgÀÄUÀ¼À ¸ÉêÉAiÀÄ£ÀÄß ¸ÀPÁðj ¸ÉêÉAiÀÄ°è «°Ã£ÀUÉÆ½¸À¯ÁVgÀÄvÀÛzÉ.

¨sÁUÀ 1

PÀ£ÁðlPÀ gÁdå¥ÀvÀæ, UÀÄgÀĪÁgÀ, K¦æ¯ï 17, 2014

645

¥Àæ¸ÁÛªÀ£ÉAiÀÄ£ÀÄß PÀÆ®APÀµÀªÁV ¥Àj²Ã°¹gÀĪÀ ¸ÀPÁðgÀªÀÅ, UÀÄwÛUÉ DzsÁgÀzÀ £ÉêÀÄPÁw¬ÄAzÀ ¸ÉêÁ ¸ÀPÀæªÀÄUÉÆAqÀÄ ªÉÄʸÀÆj£À

¸ÀPÁðj DAiÀÄĪÉÃðzÀ ªÉÊzÀåQÃAiÀÄ ªÀĺÁ«zÁå®AiÀÄzÀ°è PÀvÀðªÀå ¤ªÀð»¸ÀÄwÛgÀĪÀ F PɼÀPÀAqÀ 13 d£À G¥À£Áå¸ÀPÀgÀÄUÀ¼ÀÄ CªÀgÀÄUÀ¼À

¥Àj«ÃPÀëuÁ CªÀ¢üAiÀÄ£ÀÄß vÀȦÛPÀgÀªÁV ¥ÀÆgÉʹgÀÄvÁÛgÉAzÀÄ WÉÆÃ¶¸À®Ä ¤zsÀðj¹zÉ. DzÀÄzÀjAzÀ F PɼÀPÀAqÀ DzÉñÀ.

¸ÀPÁðgÀzÀ DzÉñÀ ¸ÀASÉå: DPÀÄPÀ 62 ¦nr 2014, ¨ÉAUÀ¼ÀÆgÀÄ, ¢£ÁAPÀ: 22-02-2014

¥Àæ¸ÁÛªÀ£ÉAiÀÄ°è «ªÀj¹gÀĪÀ CA±ÀUÀ¼À »£É߯ÉAiÀİè, PÀ£ÁðlPÀ ¸ÀPÁðj ¸ÉêÁ (¥Àj«ÃPÀëuÉ) ¤AiÀĪÀÄUÀ¼ÀÄ, 1977gÀ ¤AiÀĪÀÄ 5(1)(J)

gÀ£ÀéAiÀÄ ªÉÄʸÀÆj£À ¸ÀPÁðj DAiÀÄĪÉÃðzÀ ªÉÊzÀåQÃAiÀÄ ªÀĺÁ«zÁå®AiÀÄzÀ°è PÀvÀðªÀå ¤ªÀð»¸ÀÄwÛgÀĪÀ F PɼÀPÀAqÀ 13 d£À G¥À£Áå¸ÀPÀgÀÄUÀ¼ÀÄ

CªÀgÀÄUÀ¼À ºÉ¸ÀgÀÄUÀ¼À ªÀÄÄAzÉ £ÀªÀÄÆ¢¹zÀ ¢£ÁAPÀzÀAzÀÄ ¥Àj«ÃPÀëuÁ CªÀ¢üAiÀÄ£ÀÄß vÀȦÛPÀgÀªÁV ¥ÀÆgÉʹgÀÄvÁÛgÉAzÀÄ WÉÆÃ¶¸À¯ÁVzÉ.

PÀæªÀÄ

¸ÀASÉå

G¥À£Áå¸ÀPÀgÀ ºÉ¸ÀgÀÄ

£ÉêÀÄPÁwAiÀiÁzÀ DzÉñÀ

¸ÀASÉå ªÀÄvÀÄÛ ¢£ÁAPÀ

¸ÉêÉUÉ ºÁdgÁzÀ

¢£ÁAPÀ

¥Àj«ÃPÀëuÁ CªÀ¢üAiÀÄ£ÀÄß

vÀȦÛPÀgÀªÁV ¥ÀÆgÉʹzÀ

¢£ÁAPÀ

1

2

3

4

5

1

qÁ|| ¸ÀĪÀÄ£ï

DPÀÄPÀ 110 ¦nr 2009,

¢£ÁAPÀ 22-07-2011

26-07-2011

25-07-2013

C¥ÀgÁºÀß

2

qÁ|| ªÀĪÀÄvÁ²æÃ J¸ï

DPÀÄPÀ 110 ¦nr 2009,

¢£ÁAPÀ 22-07-2011

26-07-2011

25-07-2013

C¥ÀgÁºÀß

3

qÁ|| «dAiÀÄ®Qëöä f.ºÉZï.

DPÀÄPÀ 110 ¦nr 2009,

¢£ÁAPÀ 22-07-2011

26-07-2011

25-07-2013

C¥ÀgÁºÀß

4

qÁ|| DzÀ±Àð J¸ï.f.

DPÀÄPÀ 110 ¦nr 2009,

¢£ÁAPÀ 22-07-2011

26-07-2011

25-07-2013

C¥ÀgÁºÀß

5

qÁ|| ¸ÀAdAiÀÄ PÀĪÀiÁgï JA.r.

DPÀÄPÀ 110 ¦nr 2009,

¢£ÁAPÀ 22-07-2011

26-07-2011

25-07-2013

C¥ÀgÁºÀß

6

qÁ|| ªÁ¸ÀÄzÉêÀ D£ÀAzÀgÁªï ZÁmÉ

DPÀÄPÀ 110 ¦nr 2009,

¢£ÁAPÀ 22-07-2011

26-07-2011

25-07-2013

C¥ÀgÁºÀß

7

qÁ|| gÁdÄ f. PÀÄgÀtÂ

DPÀÄPÀ 110 ¦nr 2009,

¢£ÁAPÀ 22-07-2011

26-07-2011

25-07-2013

C¥ÀgÁºÀß

8

qÁ|| £À½¤ J£ï.

DPÀÄPÀ 110 ¦nr 2009,

¢£ÁAPÀ 22-07-2011

26-07-2011

25-07-2013

C¥ÀgÁºÀß

9

qÁ|| £ÁUÉÃ±ï ºÉZï.r.

DPÀÄPÀ 110 ¦nr 2009,

¢£ÁAPÀ 22-07-2011

26-07-2011

25-07-2013

C¥ÀgÁºÀß

10

qÁ|| CgÀ«AzÀ AiÀiÁzÀªï. J¸ï.

DPÀÄPÀ 110 ¦nr 2009,

¢£ÁAPÀ 22-07-2011

26-07-2011

25-07-2013

C¥ÀgÁºÀß

11

qÁ|| ªÀÄĸÀÛPï CºÀªÀÄzï £ÉUÀ¼ÀÆgÀÄ

DPÀÄPÀ 110 ¦nr 2009,

¢£ÁAPÀ 22-07-2011

26-07-2011

25-07-2013

C¥ÀgÁºÀß

12

qÁ|| D£ÀAzÀ PÀnÖ

DPÀÄPÀ 110 ¦nr 2009,

¢£ÁAPÀ 22-07-2011

26-07-2011

25-07-2013

C¥ÀgÁºÀß

13

qÁ|| C£ÀÄgÀÆ¥À ºÉZï.PÉ.

DPÀÄPÀ 110 ¦nr 2009,

¢£ÁAPÀ 22-07-2011

26-07-2011

25-07-2013

C¥ÀgÁºÀß

µÀgÀvÀÄÛ : F DzÉñÀªÀÅ PÉ.J.n. Cfð ¸ÀASÉå : 5161-5260/2012 ºÁUÀÆ PÉ.J.n. Cfð ¸ÀASÉå 4353-06/2013 WÀ£À PÀ£ÁðlPÀ DqÀ½vÀ

£ÁåAiÀĪÀÄAqÀ½AiÀÄÄ ¤ÃqÀĪÀ CAwªÀÄ wæðUÉ M¼À¥ÀnÖgÀÄvÀÛzÉ.

PR. 268

PÀ£ÁðlPÀ gÁdå¥Á®gÀ DeÁÕ£ÀĸÁgÀ ªÀÄvÀÄÛ CªÀgÀ ºÉ¸Àj£À°è,

n.J£ï. £ÀgÀ¹AºÀgÁdÄ,

¸ÀPÁðgÀzÀ C¢üãÀ PÁAiÀÄðzÀ²ð (¥Àæ),

DgÉÆÃUÀå ªÀÄvÀÄÛ PÀÄlÄA§ PÀ¯Áåt E¯ÁSÉ.

(¨sÁ.ªÉÊ. ¥ÀzÀÞw ªÀÄvÀÄÛ ¸ÀªÀÄ£ÀéAiÀÄ)

PÀ£ÁðlPÀ gÁdå¥ÀvÀæ, UÀÄgÀĪÁgÀ, K¦æ¯ï 17, 2014

¨sÁUÀ 1

646

vÉÆÃlUÁjPÉ ¸ÀaªÁ®AiÀÄ

«µÀAiÀÄ: ``vÉAUÀÄ GvÀà£Àß GzÁå£ÀUÀ¼ÀÄ'' JA§ ºÉƸÀ AiÉÆÃd£ÉAiÀÄr 2013-14£Éà ¸Á°£À°è vÀĪÀÄPÀÆgÀÄ

f¯ÉèAiÀÄ ²gÁzÀ°è vÉAUÀÄ ¥ÁPïð ºÁUÀÆ GzÁå£ÀªÀ£À ¸Áܦ¸À®Ä DqÀ½vÁvÀäPÀ ªÀÄAdÆgÁw

ºÁUÀÆ Grant-in-Aid ªÀÄÆ®PÀ C£ÀÄzÁ£ÀªÀ£ÀÄß ¥ÀqÉAiÀÄ®Ä C£ÀĪÀÄw ¤ÃqÀĪÀ §UÉÎ.

NzÀ¯ÁVzÉ:

1.

¸ÀPÁðgÀzÀ DzÉñÀ ¸ÀASÉå : vÉÆÃE 87 vÉÆAiÉÆÃPÁ 2013, ¢£ÁAPÀ 31-08-2013

2.

¸ÀPÁðgÀzÀ DzÉñÀ ¸ÀASÉå : vÉÆÃE 87 vÉÆAiÉÆÃPÁ 2013, ¢£ÁAPÀ 21-09-2013

3.

vÉÆÃlUÁjPÉ ¤zÉÃð±À£Á®AiÀÄzÀ ¥ÀvÀæ ¸ÀASÉå : vÉÆÃE/vÉÆÃdA¤/vÉÆÃ¨É/«¤1/60/

2013-14/2482, ¢£ÁAPÀ 15-03-2014.

¥Àç¸ÁÛªÀ£É:

ªÉÄÃ¯É NzÀ¯ÁzÀ (1) gÀ°è 2013-14£Éà ¸Á°£À°è vÉÆÃlUÁjPÉ E¯ÁSÉAiÀÄ ªÀw¬ÄAzÀ ``vÉAUÀÄ GvÀà£Àß GzÁå£ÀUÀ¼ÀÄ'' JA§ ºÉƸÀ

AiÉÆÃd£ÉAiÀÄ£ÀÄß C£ÀĵÁ×£ÀUÉÆ½¸À®Ä ¯ÉPÀÌ ²Ã¶ðPÉ 2401-00-108-2-54 gÀr 100.00 ®PÀëUÀ¼À£ÀÄß «¤AiÉÆÃV¸À®Ä vÉÆÃlUÁjPÉ E¯ÁSÉAiÀÄ

¤zÉÃð±ÀPÀjUÉ C£ÀĪÀÄw ¤ÃqÀ¯ÁVzÉ.

ªÉÄÃ¯É NzÀ¯ÁzÀ (2) gÀ°è F GzÉÝñÀPÁÌV ªÉÆzÀ¯ÉgÀqÀÄ vÉæöʪÀiÁ¹PÀ C£ÀÄzÁ£À gÀÆ. 50.00 ®PÀëUÀ¼À£ÀÄß ©qÀÄUÀqÉ ªÀiÁqÀ¯ÁVzÉ.

ªÉÄÃ¯É NzÀ¯ÁzÀ (3) gÀ vÉÆÃlUÁjPÉ ¤zÉÃð±ÀPÀgÀ ¥ÀvÀæzÀ°è vÀĪÀÄPÀÆgÀÄ f¯ÉèAiÀÄ, ²gÁ vÁ®ÆèQ£À°è vÉAUÀÄ ¥ÁPïð ¸Áܦ¸À®Ä

¤«Äðw PÉÃAzÀæ, vÀĪÀÄPÀÆgÀÄ, EªÀjAzÀ MlÄÖ 7 PÁªÀÄUÁjUÀ½UÉ gÀÆ. 263.70 ®PÀëUÀ¼À CAzÁdÄ ¥ÀnÖAiÀÄ£ÀÄß ¥ÀqÉzÀÄ DqÀ½vÁvÀäPÀ

ªÀÄAdÆgÁwUÁV ºÁUÀÆ Grant-in-Aid ©¯ï ªÀÄÆ®PÀ ©qÀÄUÀqÉAiÀiÁzÀ C£ÀÄzÁ£ÀªÀ£ÀÄß ¤«Äðw PÉÃAzÀæ vÀĪÀÄPÀÆgÀÄgÀªÀjUÉ ¸ÀAzÁAiÀÄ

ªÀiÁqÀ®Ä PÉÆÃj ¥Àæ¸ÁÛªÀ£ÉAiÀÄ£ÀÄß ¸À°è¹gÀÄvÁÛgÉ.

¸ÀzÀj ¥Àæ¸ÁÛªÀ£ÉAiÀÄ£ÀÄß ¸ÀPÁðgÀªÀÅ PÀÆ®APÀµÀªÁV ¥Àj²Ã°¹, F PɼÀV£ÀAvÉ DzÉò¹zÉ.

¸ÀPÁðgÀzÀ DzÉñÀ ¸ÀASÉå: vÉÆÃE 52 vÉÆÃ¸À« 2014, ¨ÉAUÀ¼ÀÆgÀÄ, ¢£ÁAPÀ: 18-03-2014

¥Àæ¸ÁÛªÀ£ÉAiÀÄ°è «ªÀj¹gÀĪÀ CA±ÀUÀ¼À »£É߯ÉAiÀİè vÀĪÀÄPÀÆgÀÄ f¯ÉèAiÀÄ ²gÁzÀ°è vÉAUÀÄ ¥ÁPï𠤫Äð¸À®Ä vÀĪÀÄPÀÆgÀÄ ¤«Äðw

PÉÃAzÀæªÀÅ ¸À°è¹gÀĪÀ gÀÆ. 263.70 ®PÀë (gÀÆ¥Á¬Ä E£ÀÆßgÀ CgÀªÀvÀÛ ªÀÄÆgÀÄ ®PÀëzÀ J¥ÀàvÀÄÛ ¸Á«gÀUÀ¼ÀÄ ªÀiÁvÀæ)UÀ¼À CAzÁfUÉ F ªÀÄÆ®PÀ

DqÀ½vÁvÀäPÀ C£ÀĪÀÄwAiÀÄ£ÀÄß ¤ÃqÀ¯ÁVzÉ. vÉÆÃlUÁjPÉ ¤zÉÃð±ÀPÀjUÉ FUÁUÀ¯Éà ©qÀÄUÀqÉAiÀiÁzÀ C£ÀÄzÁ£ÀzÀ°è gÀÆ.25.00 ®PÀë (gÀÆ¥Á¬Ä

E¥ÀàvÉÛöÊzÀÄ ®PÀëUÀ¼ÀÄ ªÀiÁvÀæ)UÀ¼À£ÀÄß Grant-in-Aid ©¯ï ªÀÄÆ®PÀ vÀĪÀÄPÀÆgÀÄ ¤«Äðw PÉÃAzÀæPÉÌ ¸ÀAzÁAiÀÄ ªÀiÁqÀ®Ä vÉÆÃlUÁjPÉ ¤zÉÃð±ÀPÀjUÉ

C£ÀĪÀÄw ¤ÃqÀ¯ÁVzÉ.

F DzÉñÀªÀ£ÀÄß ¸ÀPÁðgÀzÀ DzÉñÀ ¸ÀASÉå : J¥sïr 1 nJ¥sï¦ 2008, ¢£ÁAPÀ 16-05-2008 gÀ£ÀéAiÀÄ ªÀÄvÀÄÛ DzÉñÀ ¸ÀASÉå :

J¥sïr 1 nJ¥sï¦ 2002, ¢£ÁAPÀ 20-01-2003 gÀ°è E¯ÁSÉAiÀÄ ¥ÀæzsÁ£À PÁAiÀÄðzÀ²ðAiÀĪÀjUÉ zÀvÀÛªÁVgÀĪÀ «vÁÛ¢üPÁgÀzÀ£ÀéAiÀÄ ºÁUÀÆ

DAvÀjPÀ DyðPÀ ¸À®ºÉUÁgÀgÀ n¥Ààt ¸ÀASÉå : vÉÆÃE 24 DAD¸À 2014 ¢£ÁAPÀ 12-03-2014 gÀ£ÀéAiÀÄ ºÉÆgÀr¸À¯ÁVzÉ.

PR. 339

S.C. 20

PÀ£ÁðlPÀ gÁdå¥Á®gÀ DeÁÕ£ÀĸÁgÀ ªÀÄvÀÄÛ CªÀgÀ ºÉ¸Àj£À°è,

©.«. gÁªÀİAUÀAiÀÄå,

¸ÀPÁðgÀzÀ C¢üãÀ PÁAiÀÄðzÀ²ð,

vÉÆÃlUÁjPÉ E¯ÁSÉ.

COMMERCE AND INDUSTRIES SECRETARIAT

Sub :

Project Proposal of M/s Prem Sugars & Chemicals Corporation Ltd., to establish a "2500

TCD to 5000 TCD, Co-gen Capacity from 22 to 32 MW and Establishment of 45000 KLPD

Ethanol Plant" at Bellur Village, Nagamangala Taluk, Mandya District - Enhancement of

Crushing Capacity - Reg.

Ref :

1)

Proceeding of the 158th State Level Single Window Clearance Committee meeting

held on 17.09.1996.

2)

Proceedings of the 33rd State High Level Clearance Committee (SHLCC) meeting

held on 19.11.2013.

PREAMBLE:

M/s. Prem Sugars & Chemicals Corporation Ltd., had obtained approval from the Government in ·1996 for establishment

of a White Cristal Sugar manufacturing unit with 2500 TCD capacity and 22 MW Co-gen capacity plant in 98.27 acres of land in

Mandya District.

¨sÁUÀ 1

PÀ£ÁðlPÀ gÁdå¥ÀvÀæ, UÀÄgÀĪÁgÀ, K¦æ¯ï 17, 2014

647

Subsequently M/s Prem Sugars & Chemicals Corporation Ltd.. submitted a proposal for enhancing the crushing capacity

from "2500 TCD. to 5000 TCD Co-gen capacity from 22 to 32 MW and establishment of 45000 KLPD Ethanol Plant". with an investment

of Rs. 450.00 crores in 98.27 acres of land. near Bellur Village, Nagamangala Taluk, Mandya District was discussed in the 174th

Screening. Committee meeting held on 21.12.2012.

The Committee directed the company, to obtain Distance Certificate - from Cane Commissioner: hence the subject was

deferred in the 174th Screening Committee meeting held on 21.12.2012.

The Company in its letter dated: 02.05.2013 have submitted the copy of the Distance Certificate No. DSK/DEV/110/2011-12

(Prem Sugars) dated 05.11.2012 issued by the Cane Commissioner for Cane Development and Director of Sugar. The company has

also filed a necessary application for obtaining IEM, the company has received an acknowledgement from Ministry of Commerce &

Industry, New Delhi vide Ref. No. 2538/SIA/IMO/2012, 2539/SIA/IMO/2012 and 2540/SIA/IMO/2012, dated 12.11.2012 the Company

has also furnished the acknowledgement copy of IEM obtained by Ministry of Commerce & Industries New Delhi.

Agriculture Department vide their letter dated: 09.10.2013 have submitted opinion on the location of the proposed project. It is

opined that the land identified for the project is fit for cultivation and the lands are Kushki farmers are growing single crop in a year.



M/s Prem Sugars & Chemicals Corporation Ltd has been approved in 158th SLSWCC held on 17th September 1996.



The promoter Dr. K.S. Thirumalaswamy has taken license from Government of India to implement the project, during the

implementation process the promoter passed. away during 2004.



The new Directors Mr. Jayadev, Mr. Vishal Jayadev and. Mr. Hari Mohan Naidu joined the Company in 2010 and stated the

process of irnplementation. Subsequently, issues regarding the compensation to land losers was solved and company took

extension of time from KIADB twice in 02.07.2011 & 25.08.2012.



KIADB has approved the building plan on 29.08.2012 valid upto 24.08.2013.



Company has obtained IEM from Ministry of Commerce & Industries, New Delhi vide No. 2538/SIA/IMO 2012 dated:

12.11.2012.



Company also obtained consent for establishment from Karnataka State Pollution Control Board Vide their letter No.

PCB/264/HP 1/2011/887 dated: 20.11.2012.



The company has completed Fencing after taking the possession of land and .approached Corporation Bank for

Financial assistance Bank has given in principle approval for sanctioning. of term loan of Rs. 150.00 crores and insisted

for extension of time.



Company has applied to Karnataka Udyog Mitra for extension of time on 25.05.2012. It is processed in KUM after taking IEM

and placed before SHLSC and it is cleared in 176th Screening Committee meeting held on 13.03.2013 and recommended to

SHLCC to approve the increase in capacity, extension of time and acquire the additional land of 71.8 acres of adjacent land.

The company in its letter dated 14.12.2012 has informed that the Railway Track between Bangalore to Hassan will run

through the existing land due to which the company will not be able to utilise 40 acres of allotted land, accordingly they have requested

to acquire and allot land to an extent of 33.8 acres.

The Company has requested the committee to consider the following:

1.

Increase in crushing capacity 2500 TCD to 5000 TCD.

2.

Increase Co-Gen Capacity from 22 to 32 MW.

3.

Establishment of 45000 LPD Ethanol Plant.

4.

To grant extension of time to implement the earlier approved project by two years.

5.

Acquire and allotment of additional land of 71.8 acres.

Commissioner, Sugar in their letter informed that the factory has obtained IEM from Govt. of India vide· No.

2538/SIA/IMO/2012, dated: 02.11.2012. The said factory has been taken on records as New Sugar Factory vide Govt. of India order

dated: 21.01.2013. Further the applicant is yet to obtain in-principle approval and cane area allocation from Govt. of Karnataka.

In the 33rd State High Level Clearance Committee (SHLCC) Meeting held on 19.11.2013, the proposal of the Company was

discussed and approved.

Government has examined the recommendations made by the' State High Level Clearance Committee in the 33rd Meeting

held on 19.11.2013, in all aspects.

Hence the following order:

GOVERNMENT ORDER No. CI 27 SPI 2014, BANGALORE, DATED: 30.01.2014

Government is pleased to approve the investment proposal, of M/s Prem Sugars & Chemicals Corporation Ltd., to establish a

White Cristal Sugar Manufacturing facility at Kalinganahalli Village, Bellur Hobli. Nagamangala Taluk, Mandya District with a Cane

Crushing Capacity of 5000 TCD, Co-gen Power Plant of 32 MW and 45000 LPD Ethanol Plant with an investment of Rs. 450 crores

generating an employment to about 175 persons.

PÀ£ÁðlPÀ gÁdå¥ÀvÀæ, UÀÄgÀĪÁgÀ, K¦æ¯ï 17, 2014

¨sÁUÀ 1

648

Government is also pleased to extend the following infrastructure and support:

Land :

Existing 98.27 acres of land approved as per the 158th State Level Single

Window Agency meeting in 1996, acquired and in possession of the

Company at Kalinganahalli and Hatni, Villages, Nagamangala Taluk,

Mandya District.

Water :

1.2 Million LPD of Water with the approval of WRD.

Power :

500 KVA from CESC.

Incentives &

Concessions :

As per applicable Industrial Policy of the State.

Sanction of the above infrastructure facilities, incentives and concessions is subject to the following terms and conditions:

1.

Environment: The company to obtain Consent for Establishment and Consent for Operation from KSPCB and environmental

clearance from MoEF, Govt. of India or the Dept of Forest, Ecology & Environment, Govt. of Karnataka, if applicable.

2.

Employment : The Company shall comply with the provisions of industrial Policy of Govt. of Karnataka and Dr. Sorojini

Mahishi Report. Prepare a plan for development of Human. Resources required for the project, train local people. A copy of

Human Resources Development plan shall be sent to. the Commissioner 'for Industrial Development & Director of industries.

and Commerce for monitoring.

3.

Vendor Development: Wherever there is scope for vendor development for the project, the company shall prepare a vendor

development plan, develop local vendors and procure the required inputs, components and 'sub-assemblies from these local

vendor units. A copy of the vendor development plan shall be sent to the Commissioner for Industrial Development & Director

of Industries and Commerce for monitoring.

4.

Social infrastructure Development: .. The. Company is advised to take up social infrastructure development projects in the

vicinity of the proposed location of the unit and comply with the stipulation of Company Act 2013. A copy of such projects

shall be sent to the Commissioner for Industrial Development & Director of Industries and Commerce for monitoring.

5.

Others:

a)

The company shall adopt rainwater harvesting, waste water recycling and water conservation techniques. Zero

discharge facility should be adopted wherever applicable.

b)

The company shall take all statutory and other necessary clearances from the competent authorities including Govt. of

India and shall submit milestones/progress in the implementation of the project regularly, which will be monitored by the

Department.

This approval is valid for a period of two years from the date of issue of this Government Order.

PR 312

By Order and in the name of the Governor of Karnataka,

S. UMADEVI,

Desk Officer (Technical Cell),

Commerce and Industries Department.

COMMERCE AND INDUSTRIES SECRETARIAT

Sub :

Project Proposal of M/s BMM Ispat Ltd., - to establish a unit for manufacture of "2 MTPA

Integrated Steel Plant and Slag Based Cement with 300 MW Power Plant". at Dahapur,

Nagalapura, D.N. Kere and Garage Villages, Marriyammanahalli Hobli. Hospet Taluk,

Bellary District - Extension of time - Reg.

Ref :

1)

Proceedings of the 15th State High Level Clearance Committee (SHLCC) meeting

held on 21.08.2008.

2)

Government Order No. CI 312 SPI 2008, dated: 21.10.2008.

3)

Proceedings of the 33rd State High Level Clearance Committee (SHLCC) meeting

held on 19.11.2013.

PREAMBLE:

The Proposal of M/s BMM Ispat Ltd., to establish a unit for manufacture of "2 MTPA Integrated Steel Plant and Slag Based

Cement Plant with 300 MW Power Plant" at Dahapur, Nagalapura, D.N. Kere and Garaga Villages, Marriyammanahalli Hobli, Hospet

Taluk, Bellary District with an investment of Rs. 6151.00 crore, was approved 15th SHLCC meeting held on 21.08.2008. The

Government Order was issued vide Government Order No. CI 312 SPI 2008, dated: 21.10.2008 read at (2) above.

¨sÁUÀ 1

PÀ£ÁðlPÀ gÁdå¥ÀvÀæ, UÀÄgÀĪÁgÀ, K¦æ¯ï 17, 2014

649

The company has informed that due to the following constraints they were not able to complete the entire 2 MTPA integrated

steel plant within scheduled time.



Environment Clearance (EC) from MOEF, New Delhi was granted in 2010, dated: 18.05.2010.



Consent for establishment (CFE) for 2 MTPA from KSPCB, Bangalore, dated: 02.02.2011.



NOC from Airports Authority of India for the Chimneys dated: 21.07.2011.



Patta Lands were allotted, taken Possession from KIADB in July, 2012, dated: 06~07.2012.



Government Land Government Order was issued by Revenue Dept only in December, 2012; letter no. CI 186 SPQ 2010,

dated: 03.04.2010.

The delay in handing over the land has increased the project cost from Rs. 6151.00 crores to Rs. 7000.00 crores. It is

informed that the company has invested already Rs. 1710.00 crores and the unit is under implementation stage. It may be noted that

the project has been given extension for a period of two years from 24.02.2011 earlier.

Therefore the company has requested the Committee to extend the Government Order for a further period of three years from

24.02.2013.

In the 33rd state High Level Clearance Committee (SHLCC) Meeting held on 19.11.2013, the proposal of the Company was

discussed and approved.

Government has examined the recommendations made by the State High Level Clearance Committee in the 33rd Meeting

held on 19.11.2013, in all aspects.

Hence the following order.

GOVERNMENT ORDER No. CI 27 SPI 2011, BANGALORE, DATED: 13.01.2014

The Government is pleased to grant extension of time to M/s BMM Ispat Ltd., to implement the project approved vide

Government Order No. CI 312 SPI 2008, dated: 21.10.2008 for further period of two years from the date of issue of this order.

All other terms and conditions indicated in the Government Order dated: 21.10.2008 read at (2) above, remain unaltered.

PR 313

By Order and in the name of the Governor of Karnataka,

S. UMADEVI,

Desk Officer (Technical Cell),

Commerce and Industries Department.

COMMERCE AND INDUSTRIES SECRETARIAT

Sub :

Project Proposal of M/s Amrutha Constructions Pvt. Ltd., to establish a "2 MMTPA

Cement Plant with 50 MW Coal Based Captive Power Plant" near Maralbhavi Village,

Surpura Taluk, Yadgir District - Extension of time - Reg.

Ref :

1)

Proceedings of the 24th State High Level Clearance Committee (SHLCC) meeting

held on 21.01.2011.

2)

Government Order No. CI 91 SPI 2011, dated: 26.02.2011.

3)

Proceedings of the 33rd State High Level Clearance Committee (SHLCC) meeting

held on 19.11.2013.

PREAMBLE:

The Proposal of M/s Amrutha Constructions Pvt. Ltd., to establish "2 MMTPA Cement Plant with 50 MW Coal Based Captive

Power Plant" near Maralbhavi Village, Surpura Taluk, Yadgir District with an investment of Rs. 960.00 crore, was approved in the 24th

SHLCC meeting held on 24.01.2011. The Government Order was issued vide Government Order No. 91 SPI 2011, dated: 26.02.2011

read at (2) above.

Now, the company in their letter dated: 25.2.2013 has requested to issue an amended Government Order for transfer of

approval from M/s Amrutha Constructions (P) Ltd., to M/s Amrutha Bose Cement Industries Pvt. Ltd. and inclusion of Salvadgi Village,

Bijapur District in additional to Maralbhavi Village of Yadgir District. The following documents have been submitted by the company.



Memorandum & Articles of Association of the new company.



Board resolution dated: 09.02.2013 of M/s Amrutha Constructions Pvt. Ltd.. to incorporate the new company i.e. M/s Amrutha

Bose Cement Industries Pvt. Ltd. with 51 & equity shares.



Board resolution dated: 23.02.2013 of M/s Amrutha Constructions Pvt. Ltd., subscribing 255000 equity shares of Rs. 10/- in

the new company.



Certificate of incorporation of the new company has been furnished.

PÀ£ÁðlPÀ gÁdå¥ÀvÀæ, UÀÄgÀĪÁgÀ, K¦æ¯ï 17, 2014

¨sÁUÀ 1

650

In the 33rd State High Level Clearance Committee (SHLCC) Meeting held on 19.11.2013, the proposal of the Company was

discussed and approved.

Government has examined the recommendations made by the State. High Level Clearance Committee in the 33rd Meeting

held on 19.11.2013, in all aspects.

Hence the following order.

GOVERNMENT ORDER No. CI 91 SPI 2011, BANGALORE, DATED: 09.01.2014

The Government is pleased to approve the change the name of the company of M/s Amrutha Constructions Pvt. Ltd., to M/s

Amrutha Bose Cement Industries Pvt. Ltd., for the project approved vide Government Order No. CI 91 SPI 2011, dated: 26.02.2011 as

per the norms of KIADB and grant extension of time to the company to implement the project for further period of two years from the

date of issue of this order.

All other terms and conditions indicated in the Government Order dated: 26.02.2011 read at (2) above, remain unaltered.

PR 314

By Order and in the name of the Governor of Karnataka,

S. UMADEVI,

Desk Officer (Technical Cell),

Commerce and Industries Department.

COMMERCE AND INDUSTRIES SECRETARIAT

Sub :

Project Proposal of M/s Mukund Ltd., - for "Expansion of Integrated Steel Plant Capacity

from 0.41 MTPA to 0.70 MTPA" at Koppal District - Extension of time - Reg.

Ref :

1) Proceedings of the 23rd State High Level Clearance Committee (SHLCC) meeting

held on 19.06.2010.

2) Government Order No. CI 372 SPI 2010, dated: 15.07.2010.

3) Corrigendum No. CI 372 SPI 2010, dated: 01.03.2011.

4) Proceedings of the 33rd State High Level Clearance Committee (SHLCC) meeting

held on 19.11.2013.

PREAMBLE:

The Proposal of M/s Mukund Ltd., to increase the "Integrated Steel Plant Capacity by 0.70 MTPA" at Koppal District with an

investment of Rs. 2892.00 crore. was approved 23rd SHLCC meeting held on 19.06.2010. The Government 'Order was issued vide

Government Order No. CI 372 SPI 2010, dated: 15.07.2010 read at (2) above.

A Corrigendum read at (3) above was issued to correct the increased capacity as 1.11 MMTPA.

The company in their letter dated: 27.02.2013 informed that they have purchased the 53 acres of land and the remaining land

is under the process of purchasing. The company has made an application to Water Resource Dept. for allotment of 18 MLPD of water

and has requested to grant extension of time further for a period.

In the 33rd State High Level Clearance Committee (SHLCC) Meeting held on 19.11.2013, the proposal of the Company was

discussed and approved.

Government has examined the recommendations made by the State High Level Clearance Committee in the 33rd Meeting

held on 19.11.2013, in all aspects.

Hence the following order.

GOVERNMENT ORDER No. CI 372 SPI 2010, BANGALORE, DATED: 04.01.2014

The Government is pleased to grant extension of time to M/s Mukund Ltd., to implement the project approved vide

Government Order No. CI 372 SPI 2010, dated: 15.07.2010 for further period of two years from the date of issue of this order.

All other terms and conditions indicated in the Government Order dated: 15.07.2010 read at (2) above, remain unaltered.

PR 315

By Order and in the name of the Governor of Karnataka,

S. UMADEVI,

Desk Officer (Technical Cell),

Commerce and Industries Department.

¨sÁUÀ 1

PÀ£ÁðlPÀ gÁdå¥ÀvÀæ, UÀÄgÀĪÁgÀ, K¦æ¯ï 17, 2014

651

COMMERCE AND INDUSTRIES SECRETARIAT

Sub :

Project Proposal of M/s Tata Elxsi Ltd., - to establish "Hardware Design and

Development Centre" at KIADB Hardware Industrial Park, Bangalore Rural District

Extension of time - Reg.

Ref :

1) Proceedings of the 20th State High Level Clearance Committee (SHLCC) meeting

held on 05.01.2010.

2) Government Order No. CI 77 SPI 2010, dated: 01.03.2010.

3) Proceedings of the 33rd State High Level Clearance Committee (SHLCC) meeting

held on 19.11.2013.

PREAMBLE:

The Proposal of M/s Tata Elxsi Ltd., to establish the "Hardware Design and Development Centre" at KIADB Hardware

Industrial Park, Bangalore Rural District with an investment of Rs. 486.00 crores in 20 acres of KIADB land was approved 20th SHLCC

meeting held on 05.01.2010. The Government Order .was issued vide Government Order No. CI 77 SPI 2010, dated: 01.03.2010 read

at (2) above.

The company has informed that there was a delay in implementation of the project because of delay by KIADB in developing

the said industrial Area. Therefore the company has not paid the initial deposit. The company vide its letters dated: 31.07.2012,

11.12.2012 and e-mail dated: 06.06.2013 requested to grant extension of time further for a period of two years.

In the 33rd State High Level Clearance Committee (SHLCC) Meeting held on 19.11.2013, the proposal of the Company was

discussed and approved.

Government has examined the recommendations made by the State High Level Clearance Committee in the 33rd Meeting

held on 19.11.2013, in all aspects.

Hence the following order.

GOVERNMENT ORDER No. CI 77 SPI 2010, BANGALORE, DATED: 13.01.2014

The Government is pleased to grant extension of time to M/s Tata Elxsi Ltd., to implement the project approved vide

Government Order No. CI 77 SPI 2010, dated: 01.03.2010 for further period of two years from the date of issue of this order.

All other terms and conditions indicated in the Government Order dated: 01.03.2010 read at (2) above, remain unaltered.

PR 316

By Order and in the name of the Governor of Karnataka,

S. UMADEVI,

Desk Officer (Technical Cell),

Commerce and Industries Department.

COMMERCE AND INDUSTRIES SECRETARIAT

Sub :

Project Proposal of M/s. Narth Karnataka Power Pvt. Ltd.,(formerly known as M/s Jewargi

Power Pvt. Ltd.,) - to establish "2 X 660 MW Coal Based Power Plant" at Killenkere,

Neelhalli, Kalebelgondi Villages, Yadgir District - Reg.

Ref :

1) Proceedings of the 13th State High Level Clearance Committee (SHLCC) meeting

held on 13.03.2008.

2) Government Order No. CI 175 SPI 2008, dated: 19.05.2008.

3) Amendment No. CI 175 SPI 2008, dated: 20.12.2010.

4) Government Order No. CI 175 SPI 2008, dated: 20.12.2010.

5) Proceedings of the 33rd State High Level Clearance Committee (SHLCC) meeting

held on 19.11.2013.

PREAMBLE:

The Proposal of M/s Narth Karnataka Power Pvt. Ltd., (formerly known as M/s Jewargi Power Pvt. Ltd.,) to establish "2 X 660

MW Coal Based Power Plant" with an investment of Rs: 6757.84 crores in 1800 acres of land to be acquired and allotted by KIADB at

Kattisangavi and Madri Villages, Jewargi Taluk, Gulbarga District was approved 13th SHLCC meeting held on 13.03.2008. The

Government Order was issued vide Government Order No. CI 175 SPI 2008, dated: 19.05.2008 read at (2) above.

As per request of company an Amendment Order read at (3) above was issued to change of name of company from

M/s Jewargi Power Pvt. Ltd., in favour of "M/s Narth Karnataka Power Pvt. Ltd."

Subsequently, the company has requested for change of location of the project of M/s Narth Karnataka Power Pvt. Ltd., from

Kattisangavi and Madri villages of Jewargi Taluk, Gulbarga District to Killenkere, Neelhalli, Kalebelgondi villages of Yedgir District was

approved and vide Government Order No. CI 175 SPl 2008, dated: 20.12.2010 read at (4) above.-

PÀ£ÁðlPÀ gÁdå¥ÀvÀæ, UÀÄgÀĪÁgÀ, K¦æ¯ï 17, 2014

¨sÁUÀ 1

652

The company in its letter has requested for change of name of the company from M/s Narth Karnataka Power Pvt. Ltd., to

North Karnataka Powergen Pvt. Ltd. The certificate of Incorporation dated: 27.11.2012 is furnished. Further the company secretary has

also submitted a certificate giving the names of the 5 Directors as per the Register of Director of the Company and the forms filed with

MCA. It is informed that, the Directors of Narth Karnataka Power Pvt. Ltd., and North Karnataka Powergen Pvt. Ltd., (if approved for

change of name) are the same Directors.

In the 33rd State High Level Clearance Committee (SHLCC) Meeting held on 19.11.2013, the proposal of the Company was

discussed and approved.

Government has examined the recommendations made by the State High Level Clearance Committee in the 33rd Meeting

held on 19.11.2013, in all aspects.

Hence the following order.

GOVERNMENT ORDER No. CI 20 SPl 2014 , BANGALORE, DATED: 13.01.2014

The Government is pleased to approve the change of name of the company from M/s Narth Karnataka Power Pvt. Ltd., to

"M/s North Karnataka Powergen Pvt. Ltd.." and to grant extension of time to implement the project approved vide Government Order

No. CI 175 SPI 2008, dated: 19.05.2008 for further period of two years from the date of issue of this order.

All other terms and conditions indicated in the Government Order dated: 19.05.2008 read at (2) above, remain unaltered.

PR 317

By Order and in the name of the Governor of Karnataka,

S. UMADEVI,

Desk Officer (Technical Cell),

Commerce and Industries Department.

COMMERCE AND INDUSTRIES SECRETARIAT

Sub :

Project Proposal of M/s N K Utilities Ltd., to establish "300 M W Coal Based Power Plant"

at Achanur Village, Bagalkot District - Extension of time - Reg.

Ref :

1) Proceedings of the 16th and 20th State High Level Clearance Committee (SHLCC)

meeting held on 19.11.2008 and 05.01.2010.

2) Government Order No. CI 261 SPI 2010, dated: 18.06.2010.

3) Proceedings of the 33rd State High Level Clearance Committee (SHLCC) meeting

held on 19.11.2013.

PREAMBLE:

The Proposal of M/s. N K Utilities Ltd., to establish "300 MW Coal Based Power Plant" at Kagalagomba Village, Bagalkot

District with an investment of Rs. 1740.00 crore. was approved in the 16th SHLCC meeting held on 19.11.2008. Subsequently in the

20th SHLCC meeting held on 05.01.2010 the committee approved to establish unit in 500 acres of land (225 acres u/s 109 of KLR Act

and 275 acres from KIADB as SUC) and also approved for change of location to Achanur Village, Bagalkot District. The Government

Order was issued vide Government Order No. CI 261 SPI 2010, dated: 18.06.2010 read at (2) above.

Now, The Company in their letter dated: 15.07.2013 informed that, they have started civil works at the project site after

obtaining the water allocation as per the conditions stipulated by Department of Ecology and Environment that ''the project authorities

shall commence the construction activity only after obtaining required approval from competent authority of supply of water for the

project". The company has granted water allocation of 0.52 TMC from Ghataprabha River vide Government Order dated: 14.03.2013.

The company is requesting the committee to approve for extension of 3 more years of time to implement the project.

The company has informed that the following effective steps were initiated to implement the project.

1. LAND: 243 acres of private lands in Achanur village have been acquired U/s 109 of KLR Act and through KIADB.

2. Environmental Clearance: State Level Environment Impact Assessment Authority, Karnataka State (SEIAA) has issued

the Environment Clearance vide letter dated: 18.01.2011

3. Consent of Establishment: Karnataka State Pollution Control Board has issued Consent for Establishment (CFE) vide

letter dt: 21.05.2011

4. COAL: Coal has been tied up for M/s Fajar Bumi Sakti Ltd, Indonesia and contract agreement has been signed. Coal will

reach site from Goa Port and by rail via Gadag. The railway line is just 5 KM from the site.

5. WATER: Granted water allocation order from the government on 14.03.2013 for 0.52 TMC from Ghataprabha River.

6. SURVEY: Railway survey, Contour survey, water line survey and, power evacuation line survey have been completed by

the notified agencies.

In the 33rd State High Level Clearance Committee (SHLCC) Meeting held on 19.11.2013, the proposal of the Company was

discussed and approved.

¨sÁUÀ 1

PÀ£ÁðlPÀ gÁdå¥ÀvÀæ, UÀÄgÀĪÁgÀ, K¦æ¯ï 17, 2014

653

Government has examined the recommendations made by the State High Level Clearance Committee in the 33rd Meeting

held on 19.11.2013, in all aspects.

Hence the following order.

GOVERNMENT ORDER No. CI 261 SPl 2010, BANGALORE, DATED: 06.01.2014

The Government is pleased to grant extension of time to Mi/s N K Utilities Ltd., to implement the project approved vide

Government Order No. CI 261 SPI 2010, dated: 18.06.2010 for further period of two years from the date of issue of this order.

All other terms and conditions indicated in the Government Order dated: 18.06.2010 read at (2) above, remain unaltered.

PR 318

By Order and in the name of the Governor of Karnataka,

S. UMADEVI,

Desk Officer (Technical Cell),

Commerce and Industries Department.

COMMERCE AND INDUSTRIES SECRETARIAT

Sub :

Project Proposal of M/s Trans India Shipping Services Pvt. Ltd., to establish" 1.0 MTPA

Integrated Steel Plant and 150 MW Captive Power Plant" at Elladakere, Hiriyur,

Chitradurga District - Extension of time - Reg.

Ref :

1) Proceedings of the 23rd State High Level Clearance Committee (SHLCC) meeting

held on 19.06.2010.

2) Government Order No. CI 373 SPI 2010, dated: 15.07.2010.

3) Government Order No. CI 373 SPI 2010, dated: 28.02.2011 .

4) Proceedings of the 33rd State High Level Clearance Committee (SHLCC) meeting

held on 19.11.2013.

PREAMBLE:

The Proposal of M/s Trans India Shipping Services Pvt. Ltd., to establish "1.0 MTPA - Enhancement of Integrated Steel Plant

and 150 M W Captive Power Plant" at Elladakere, Hiriyur, Chitradurga District with an investment of Rs. 1975.00 crore, was approved

23rd SHLCC meeting held on 19.06.2010. The Government Order was issued vide Government Order No. CI 373 SPI 2010,

dated: 15.07.2010 read at (2) above.

The Government Order read at (3) above was issued to approve the enhancement of Integrated Steel Plant capacity from 0.5

MMTPA to 1.00 MMTPA and the Captive Power Plant Capacity from 72 MW to 150 MW with allotment of additional land of 210 acres

and 2800 KLPD Water.

Now, the company in their letter dated: 27.09.2013 has requested for extension of time by five years to implement the project

since the Government order No. CI 373 SPI 2010, dated: 15.07.2010 was expired on 14.07.2012. The company has taken following

effective steps to implement the project.

a)

The company has obtained allotment of 440.05 acres of land from KIADB and possession certificate was also obtained.

b)

Applied to WRD for allotment of water

In the 33rd State High Level Clearance Committee (SHLCC) Meeting held on 19.11.2013, the proposal of the Company was

discussed and approved.

Government has examined the recommendations made by the State High Level Clearance Committee in the 33rd Meeting

held on 19.11.2013, in all aspects.

Hence the following order.

GOVERNMENT ORDER No. CI 16 SPI 2014, BANGALORE, DATED: 06.01.2014

The Government is pleased to grant extension of time to M/s Trans India Shipping Services Pvt. Ltd., to implement the

project approved vide Government Order No. CI 373 SPI 2010, doted: 15.07.2010 for further period of two years from the date of

issue of this order.

All other terms and conditions indicated in the Government Order dated: 15.07.2010 read at (2) above, remain unaltered.

PR 319

By Order and in the name of the Governor of Karnataka,

S. UMADEVI,

Desk Officer (Technical Cell),

Commerce and Industries Department.

PÀ£ÁðlPÀ gÁdå¥ÀvÀæ, UÀÄgÀĪÁgÀ, K¦æ¯ï 17, 2014

¨sÁUÀ 1

654

COMMERCE AND INDUSTRIES SECRETARIAT

Sub :

Project Proposal of M/s Dhruvdesh Metasteel Pvt. Ltd., - to establish an unit for

manufacture of "Mini Integrated Steel Plant with 10 MW Captive Power Plant" at

Hirebaganal Village, Ginegera Post, Koppal District - Extension of time - Reg.

Ref :

1) Proceedings of the 13th State High Level Clearance Committee (SHLCC) meeting

held on 13.03.2008.

2) Government Order No. CI 72 SPI 2008, dated: 29.04.2008.

3) Proceedings of the 33rd State High Level Clearance Committee (SHLCC) meeting

held on 19.11.2013.

PREAMBLE:

The Proposal of M/s Dhruvdesh Metasteel Pvt. Ltd., to establish an "Mini Integrated Steel Plant with 10 MW Captive Power

Plant" at Hirebaganal Village, Ginegera Post, Koppal District with an investment of Rs. 145.78 crores in 46.07 acres of land was

approved 13th SHLCC meeting held on 13.03.2008. The Government Order was issued vide Government Order No. CI 72 SPI 2008,

dated: 29.04.2008 read at (2) above .

Now, the company vide its letter dated: 23.10.2013 has submitted that, they have already commissioned the "Second Unit

100 TPD Sponge Iron Plant and 10 MW Captive Power Plant'' with a capital investment of Rs. 120.00 Crores and created employment

for about 300 persons. But however all the facilities are not implemented due to the following reasons:

a)

Mining Lease - The allotted ore reserve in Chikanayakanahalli of about 1 Million TPD is in sufficient.

b)

On absence of the sufficient ore, company is compelled to purchase iron ore from the open market at very high rates

which have affected the margins under these circumstances bankers have advised the company to implement the

project in phases.

c)

The procedural delays in taking physical possession of land.

d)

Now, bankers are seeking extension of time for implementation of the project for further funding .

In view of the above, company has requested for extension of time for 2 1/2 years to implement the project.

In the 33rd State High Level Clearance Committee (SHLCC) Meeting held on 19.11 .2013, the proposal of the Company was

discussed and approved.

Government has examined the recommendations made by the State High Level Clearance Committee in the 33rd Meeting

held on 19.11.2013, in all aspects.

Hence the following order.

GOVERNMENT ORDER No. CI 36 SPl 2010, BANGALORE, DATED: 13.01.2014

The Government is pleased to grant extension of time to M/s Dhruvdesh Metasteel Pvt. Ltd., to implement the

project approved vide Government Order No. CI 72 SPI 2008, dated: 29.04.2008 for further period of two years from the date of

issue of this order.

All other terms and conditions indicated in the Government Order dated: 29.04.2008 read at (2) above, remain unaltered.

PR 320

By Order and in the name of the Governor of Karnataka,

S. UMADEVI,

Desk Officer (Technical Cell),

Commerce and Industries Department.

COMMERCE AND INDUSTRIES SECRETARIAT

CORRIGENDUM

No. CI 162 SPI 2013, Bangalore, Dated: 17th January, 2014

Sub :

Project Proposal of M/s Dhruvdesh Metasteel Pvt. Ltd., - to establish an unit for

manufacture of "Iron Ore Pellets" at Hirebaganal Village, Koppal District - Reg.

Ref :

Government Order No. CI 162 SPI 2013, dated: 27.09.2013.

In the order portion of the Government Order No: CI 162 SPI 2013, dated: 27.09..2013, the paragraph .

"Land :

The Company is permitted to purchase 28 acre 08 gunta land (excluding Government

and Forest lands) at Hirebanganal Village, Koppal District under Section 109 of

Karnataka Land Reforms Act,1961 and for conversion of the land use".

¨sÁUÀ 1

PÀ£ÁðlPÀ gÁdå¥ÀvÀæ, UÀÄgÀĪÁgÀ, K¦æ¯ï 17, 2014

655

shall be read as;

"land :

The Company is permitted to purchase and convert for lndustrial use land in Sy. Nos.

86, 87, 89/1,89/2,90/2 & 91/2 of Chickabagnal Village, Koppel Taluk and District

measurlng 15 acres 10 guntas and Sy.· Nos. 85/G, 85/D, 85/E, 85/F of Kunikere Village,

Koppal Taluk and District measuring 13 acres 38 guntas (totaling. 29 acres and 8

guntas) U/s 109 of KLR Act, 1961".

The other terms and conditions remain the same as in the G.O read at above.

PR 321

By Order and in the name of the Governor of Karnataka,

S. UMADEVI,

Desk Officer (Technical Cell),

Commerce and Industries Department.

COMMERCE AND INDUSTRIES SECRETARIAT

Sub :

Project Proposal of M/s Orient Cement Ltd., - to establish "Cement Plant for Manufacture

of 4 MTPA Cement and 3 MTPA Clinker with 50 MW Captive Power Plant" at Itagi, Mogla,

Digaon Villages, Chittapur Taluk, Gulbarga District Reg.

Ref :

1) Proceedings of the 17th State High Level Clearance Committee (SHLCC) meeting

held on 28.01.2009.

2) Government Order No. CI 60 SPI 2009, dated: 11.08.2009.

3) Proceedings of the 33rd State High Level Clearance Committee (SHLCC) meeting

held on 19.11.2013

PREAMBLE:

The Proposal of M/s Orient Cement Ltd., to establish "Cement Plant for Manufacture of 4 MTPA Cement and 3 MTPA Clinker

with 50 MW Captive Power Plant" at Itagi, Mogla, Digaon Villages, Chittapur Taluk, Gulbarga District with an investment of Rs. 1294.00

crore, was approved 17th SHLCC meeting held on 28.01.2009. The Government Order was issued vide Government Order No. CI 60

SPI 2009, dated: 11.08.2009 read at (2) above.

The company in their letter dated: 21.09.2012 informed that they have already purchased 1323 acres of land out of 1750

acres U/s 109 of KLR Act and requested for granting permission for replacement of 275 acres of Gomala & Government land which are

out of their required area, with lands which are within their mining and factory area to make it contigious one.

Accordingly, company in their letter dated: 27.09.2012 have submitted list of revised sy. nos indicating the area required to the

extent of 1750 acres for mining and cement factory including power plant and requested for approval to purchase these lands U/s 109 of

KLR Act.

There is no change in the extent of the land and also the villages. In view of this, the subject was placed in the 174th State

High Level Screening Committee held on 21.12.2012.

The proposal of the company was discussed in detail and the committee directed the company to furnish details of effective

steps taken to implement the project and deferred. The company in its letter No: ORCEM:PROJ:0458, dated: 20.12.2012 has submitted

the status of implementation of the project.

Further the company in its letter No:OREC:PROJ:4406 dated: 20.12.2012 has requested the additional land which is

necessitated due to following facts as stated in the referred letter.

1.

Government of India, Ministry of Environment & Forests (MOEF) directive for Green belt

development in 33% of project area.

2.

Construction of water tanks for storing water requirement for five months operation Cement Plant,

Power plant, Limestone mining, Residential colony etc. as Government of Karnataka likely to

allow us water pumping for the river for only seven months in a year and for balance five months,

the requirement has to be met from storage.

3.

Construction of railway line form Chittapur railway station to railway siding within our cement plant

area.

4.

Providing land to KPTCL for switch yard etc, outside the factory area.

5.

Construction of Staff Colony, Dispensary, School & other civic amenities etc.,

Hence the company has requested the committee to consider and approve the following:

PÀ£ÁðlPÀ gÁdå¥ÀvÀæ, UÀÄgÀĪÁgÀ, K¦æ¯ï 17, 2014

¨sÁUÀ 1

656

"Revised sy. nos indicating the area required to the extent of 1750 acres for mining and cement factory including power plant".

In the 33rd State High Level Clearance Committee (SHLCC) Meeting held on 19.11 .2013, the proposal of the Company was

discussed and approved.

Government has examined the recommendations made by the State High Level Clearance Committee in the 33rd Meeting

held on 19.11.2013, in all aspects.

Hence the following order.

GOVERNMENT ORDER No. CI 60 SPl 2009, BANGALORE, DATED: 09.01.2014

The Government is pleased to approve acquisition of 275 acres of land in Sy. Nos. as per the Annexure out of the 1750 acres

already acquired for the project and grant extension of time to M/s Orient Cement Ltd., to implement the project approved vide

Government Order No. CI 60 SPI 2009, dated: 11.08.2009 for further period of two years from the date of issue of this order.

All other terms and conditions indicated in the Government Order dated: 11.08.2009 read at (2) above, remain unaltered.

PR 322

By Order and in the name of the Governor of Karnataka,

S. UMADEVI,

Desk Officer (Technical Cell),

Commerce and Industries Department.

COMMERCE AND INDUSTRIES SECRETARIAT

Sub :

Proposal of M/s Manyata Developers Pvt. Ltd., - to Unit-II for "IT/BT/BPO Park with Hotel,

Serviced Apartments, Residential Condominium and Other Common Facilities" at

Kotnatevaru, Kondanahalli and Gollahalli Villages, Devanahalli Taluk, Bangalore Rural

District - Extension of time - Reg.

Ref :

1) Proceedings of the 22nd State High Level Clearance Committee (SHLCC) meeting

held on 24.05.2010.

2) Government Order No. CI 190 SPI 2010, dated: 02.06.2010.

3) Government Order No. CI 158 SPI 2012, dated: 15.03.2013.

4) Proceedings of the 33rd state High Level Clearance Committee (SHLCC) meeting

held on 19.11.2013.

PREAMBLE:

The Proposal of M/s Manyata Developers Pvt. Ltd., to establish a "IT/BT/BPO Park with Hotel, Serviced Apartments,

Residential Condominium and Other Common Facilities" at Kotnatevaru, Kondanahalli and Collcholli Villages, Devanahalli Taluk,

Bangalore Rural District with an investment of Rs. 1880.27 crore, was approved 22nd SHLCC meeting held on 24.05.2010. The

Government Order was issued vide Government Order No. CI 190 SPI 2010, dated: 02.06.2010 read at (2) above.

In the 33rd State High Level Clearance Committee (SHLCC) Meeting held on 19.11.2013, The State High Level Clearance

Committee noted the opinion given by the Advocate General of Karnataka in his letter dated: 06.11.2013 regarding M/s Manyata

Developers Pvt. Ltd.. as per the decision of 32nd SHLCC. Committee noted the Advocate General of Karnataka's opinion which is as

under:

"Even without resorting to the process of securing change of land use under Section 14 A of the KT & CP Act, it is open to

issue a declaration under Section 3 of the KIAD Act if the following steps are adhered to before doing so:

1)

The Government should balance the requirements of both enactments to so as to provide an

harmonious construction of both the statutes.

2)

Before a Notification under Section 3( 1) of the KIAD Act, the Government should consider the

fact that such a declaration would result in change of land use.

3)

There should be a clear indication of the application of mind to all aspects of the matter relating to

change of land use where the land is to be declared as an industrial area as against the earlier

earmarking for a different purpose.

4)

There should be a clear finding that development of such industry is possible only in that area and

that area alone is suitable for the purpose and that there is no other alternative,

If these steps precede the decision to notify under Section 3 (1), then the Notification under Section 3 (1) of the Act would be

legal and valid.

¨sÁUÀ 1

PÀ£ÁðlPÀ gÁdå¥ÀvÀæ, UÀÄgÀĪÁgÀ, K¦æ¯ï 17, 2014

657

Further Advocate General has mentioned that pursuant to the resolution of the State High Level Clearance Committee dated:

24.05.2010, a Government Order was issued on 04.06.2010. A perusal of the said G.O indicates that the G.O is valid only for a period

of two years. In other words, the Government Order approving the project in question has lapsed on the expiry of two years from the

said date. In this view of the matter, if the Government is still interested in considering the project, the entire exercise will have to be

undertaken afresh in the light of the law set out in the earlier paragraphs.

The committee noted the opinion of the Advocate General along with the fallowing salient features in the present case. A

conjoint reading of both the facts at hand herein and the opinion of the learned Advocate General would summate as under:

The Karnataka Industrial Area Development Act, 1966 is an enactment not only with an intent and purport of developing

industrial area in the state but also to have a planned approach of industrial lands. The initiatives of planning in terms of the KT & CP

Act and the KIAD Act, 1966 are to be in consonance with one another. In view of the aforementioned the following facts were discussed:

1)

The lands in question form a part of a contiguous block with the lands notified for IT Park Industrial Area in terms of an

earlier notification, dated 25.09.2008. Not to mention contiguity, compactness and integrated nature of the land adds to

the already existing industrial infrastructure created for the IT Park Industrial Area. In view of the same the contiguity,

compactness and existing infrastructure form the furtherance of the essential object of both the enactments, the KT & CP

Act and the KIAD Act, i.e.. planned development.

2)

A combined layout map of Bangalore Hardware - IT /BT - Areospace and SEZ Parks at Devanahalli, Bangalore adjacent

to the Bangalore International Airport (yet another acquisition under the KIADB, i.e.. industrial land) are part of villages

that are adjacent to the present lands forming a contiguous, compact block of industrial lands. Not to mention the project

proponent has procured the consent of the land owners whose lands are situated adjacent and adjoining to the existing

land situated at ITBT Industrial Area. The proposed acquisition will enable the formation of a better, larger and well

equipped industrial land/area rather than having a small piece/patch of lands earmarked for agriculture amongst, rather in

the midst, of large contiguous industrial lands.

3)

The lands proposed to be acquired for the project proponent herein are situated at Gollahalli-Kotnathevaru-Kondanahalli

villages. All villages adjoining the area proposed for the project herein, i.e., Bandikodigehalli Gollahalli, Singalli,

Arebinnmangala. Huvinaykanahalli, Mahadevakodigenahalli, B. K. Palya, kothnathevaru, Kondanahalli for industrial areas

acquired for Hardware - IT /BT - Areospace and SEZ Parks. These lands are already existing industrial lands. The lands

proposed for acquisition form a contiguous block with the lands mentioned hereinabove. In view of the contiguity,

compactness and integrated nature the lands are ideally suited for industrial usage.

4)

The said lands are for a Single Unit Complex and incidentally the project proponent has procured consent as regards

most of the lands proposed for acquisition. The requirement of a track to an extent as required by the petitioner coupled

with other factors as mentioned hereinabove make the proposal of the project feasible in 'the very lands and the said

lands are the only lands ideally suited for the project.

Incidentally, the opinion of the learned Advocate General read in consonance with the facts on hand in the present case

would reveal that the lands are ideally suited for the proposed project and the same is to be encouraged. The case at hand herein is

one wherein change in land use as contemplated under the KT & CP Act, is not required as the case squarely fits into the parameters

as assigned by the learned Advocate General for harmonious reading of both enactments, i.e., the KT & CP Act and the KIAD Act. In

turn, making the proposal at hand, a fit case for issuance of notification under section 3(1) of KIAD Act, 1966.· In view of the same the

committee decided to encourage the project. The committee ratified the issuance of GO dated 15.3.2013 and granted 2 years extension

of time to implement the project.

Government has examined the recommendations made by the State High Level Clearance Committee in the 33rd Meeting

held on 19.11 .2013, in all aspects.

Hence the following order.

GOVERNMENT ORDER No. CI 158 SPI 2012, BANGALORE, DATED: 03.01.2014

Action taken by Commerce and Industries Department as per Government Order No. CI 158 SPI 2012, dated: 15.03.2013 is

ratified. Further the Government is pleased to grant two years extension of time from the date of issue of this order to M/s Manyata

Developers Pvt. Ltd., to implement the project approved vide Government Order No. CI 190 SPI 2010, dated: 02.06.2010 and

Government Order No. CI 158 SPI 2012, dated: 15.03.2013.

AII other terms and conditions indicated in the Government Order dated: 02.06.2010 read at (2) above, remain unaltered.

PR 323

By Order and in the name of the Governor of Karnataka,

S. UMADEVI,

Desk Officer (Technical Cell),

Commerce and Industries Department.

PÀ£ÁðlPÀ gÁdå¥ÀvÀæ, UÀÄgÀĪÁgÀ, K¦æ¯ï 17, 2014

¨sÁUÀ 1

658

£ÀUÀgÁ©üªÀÈ¢Þ ¸ÀaªÁ®AiÀÄ

C¢üPÀÈvÀ eÁÕ¥À£À

¸ÀASÉå: £ÀCE 39 ¸ÀªÀÄ£ÀéAiÀÄ 2014 ¨ÉAUÀ¼ÀÆgÀÄ, ¢£ÁAPÀ: 01-03-2014

«µÀAiÀÄ

:

£ÀUÀgÁ©üªÀÈ¢Þ E¯ÁSÉAiÀÄ mÉAqÀgï §Ä¯Én£ï£À°è ¥ÀæPÀn¸À®Ä C¥ÀgÀ PÁAiÀÄðzÀ²ð £ÀUÀgÁ©üªÀÈ¢Þ

E¯ÁSÉ EªÀgÀ£ÀÄß mÉAqÀgï §Ä¯Én£ï C¢üPÁjAiÀÄ£ÁßV £ÉëĸÀĪÀ §UÉÎ.

G¯ÉèÃR :

¸ÀªÀĸÀASÉåAiÀÄ C¢üPÀÈvÀ eÁÕ¥À£À, ¢£ÁAPÀ: 27-01-2014.

G¯ÉèÃTvÀ C¢üPÀÈvÀ eÁÕ¥À£ÀzÀ°è £ÀUÀgÁ©üªÀÈ¢Þ E¯ÁSÉAiÀÄ mÉAqÀgï £ÉÆÃn¦üPÉõÀ£ï ¥Àæ¸ÁÛªÀ£ÉUÀ¼À£ÀÄß mÉAqÀgï §Ä¯Én£ï£À°è ¥ÀæPÀn¸À®Ä

¸ÀPÁðgÀzÀ C¥ÀgÀ PÁAiÀÄðzÀ²ð, £ÀUÀgÁ©üªÀÈ¢Þ E¯ÁSÉ EªÀgÀ£ÀÄß mÉAqÀgï §Ä¯Én£ï C¢üPÁjAiÀÄ£ÁßV £ÉëĸÀ¯ÁVzÀÄÝ EzÀ£ÀÄß ªÀiÁ¥Àðr¹

EªÀgÀ §zÀ¯ÁV ¸ÀPÁðgÀzÀ G¥À-PÁAiÀÄðzÀ²ð-2, £ÀUÀgÁ©üªÀÈ¢Þ E¯ÁSÉ EªÀgÀ£ÀÄß mÉAqÀgï §Ä¯Én£ï C¢üPÁjAiÀÄ£ÁßV PÀÆqÀ¯Éà eÁjUÉ

§gÀĪÀAvÉ £ÉëĸÀ¯ÁVzÉ.

PR. 325

J£ï. UÉÆÃ¥Á®AiÀÄå

¸ÀPÁðgÀzÀ C¢üãÀ PÁAiÀÄðzÀ²ð,

£ÀUÀgÁ©üªÀÈ¢Þ E¯ÁSÉ (¸ÀªÀÄ£ÀéAiÀÄ).

£ÀUÀgÁ©üªÀÈ¢Þ ¸ÀaªÁ®AiÀÄ

C¢üPÀÈvÀ eÁÕ¥À£À

¸ÀASÉå: £ÀCE 39 ¸ÀªÀÄ£ÀéAiÀÄ 2014 ¨ÉAUÀ¼ÀÆgÀÄ, ¢£ÁAPÀ: 27-01-2014

«µÀAiÀÄ

:

£ÀUÀgÁ©üªÀÈ¢Þ E¯ÁSÉAiÀÄ mÉAqÀgï §Ä¯Én£ï£À°è ¥ÀæPÀn¸À®Ä C¥ÀgÀ PÁAiÀÄðzÀ²ð £ÀUÀgÁ©üªÀÈ¢Þ

E¯ÁSÉ EªÀgÀ£ÀÄß mÉAqÀgï §Ä¯Én£ï C¢üPÁjAiÀÄ£ÁßV £ÉëĸÀĪÀ §UÉÎ.

G¯ÉèÃR :

¸ÀPÁðgÀzÀ G¥À-PÁAiÀÄðzÀ²ð-1, £ÀUÀgÁ©üªÀÈ¢Þ E¯ÁSÉ EªÀgÀ n¥Ààt ¢£ÁAPÀ: 18-01-2014.

£ÀUÀgÁ©üªÀÈ¢Þ E¯ÁSÉAiÀÄ mÉAqÀgï £ÉÆÃn¦üPÉõÀ£ï ¥Àæ¸ÁÛªÀ£ÉUÀ¼À£ÀÄß mÉAqÀgï §Ä¯Én£ï£À°è ¥ÀæPÀn¸À®Ä mÉAqÀgï §Ä¯Én£ï

C¢üPÁjAiÀiÁVzÀÝ ¸ÀPÁðgÀzÀ G¥À-PÁAiÀÄðzÀ²ð-1, £ÀUÀgÁ©üªÀÈ¢Þ E¯ÁSÉ EªÀgÀ §zÀ¯ÁV ¸ÀPÁðgÀzÀ C¥ÀgÀ PÁAiÀÄðzÀ²ð, £ÀUÀgÁ©üªÀÈ¢Þ

E¯ÁSÉ EªÀgÀ£ÀÄß mÉAqÀgï §Ä¯Én£ï C¢üPÁjAiÀÄ£ÁßV PÀÆqÀ¯Éà eÁjUÉ §gÀĪÀAvÉ £ÉëĸÀ¯ÁVzÉ.

PR. 326

J£ï. UÉÆÃ¥Á®AiÀÄå

¸ÀPÁðgÀzÀ C¢üãÀ PÁAiÀÄðzÀ²ð,

£ÀUÀgÁ©üªÀÈ¢Þ E¯ÁSÉ (¸ÀªÀÄ£ÀéAiÀÄ).

AiÉÆÃd£É, PÁAiÀÄðPÀæªÀÄ ¸ÀAAiÉÆÃd£É ªÀÄvÀÄÛ ¸ÁATåPÀ ¸ÀaªÁ®AiÀÄ

«µÀAiÀÄ

:

PÀ£ÁðlPÀ ±Á¸ÀPÀgÀ ¸ÀܽÃAiÀÄ ¥ÀæzÉñÁ©üªÀÈ¢Þ AiÉÆÃd£É Cr 2013-14£Éà ¸Á°£À C£ÀÄzÁ£À

©qÀÄUÀqÉ ªÀiÁqÀĪÀ §UÉÎ.

NzÀ¯ÁVzÉ :

1. ¸ÀPÁðj DzÉñÀ ¸ÀASÉå: AiÉÆÃE 47 AiÉÆÃ«« 2013, ¢£ÁAPÀ: 11-07-2013.

2. ¸ÀPÁðj DzÉñÀ ¸ÀASÉå: AiÉÆÃE 36 AiÉÆÃ«« 2013, ¢£ÁAPÀ: 02-08-2013.

3. ¸ÀPÁðj DzÉñÀ ¸ÀASÉå: AiÉÆÃE 36 AiÉÆÃ«« 2013, ¢£ÁAPÀ: 19-09-2013.

4. ¸ÀPÁðj DzÉñÀ ¸ÀASÉå: AiÉÆÃE 36 AiÉÆÃ«« 2013, ¢£ÁAPÀ: 28-10-2013.

5. ¸ÀPÁðj DzÉñÀ ¸ÀASÉå: AiÉÆÃE 36 AiÉÆÃ«« 2013, ¢£ÁAPÀ: 09-01-2014.

¥Àæ¸ÁÛªÀ£É :

2013-14£Éà ¸Á°£À°è PÀ£ÁðlPÀ ±Á¸ÀPÀgÀ ¸ÀܽÃAiÀÄ ¥ÀæzÉñÁ©üªÀÈ¢Þ AiÉÆÃd£É Cr MlÄÖ gÀÆ.60150.00 ®PÀëUÀ¼À£ÀÄß MzÀV¸À¯ÁVzÀÄÝ,

F ¥ÉÊQ ªÉÄÃ¯É NzÀ¯ÁzÀ (1)gÀ ¸ÀPÁðj DzÉñÀzÀ°è 2012-13£Éà ¸Á°£À°è 8 f¯ÉèUÀ½UÉ ©qÀÄUÀqÉAiÀiÁUÀzÀ gÀÆ.1547.52 ®PÀëUÀ¼À£ÀÄß 2013-14£ÉÃ

¸Á°£À C£ÀÄzÁ£ÀzÀ°è ©qÀÄUÀqÉ ªÀiÁqÀ¯ÁVzÉ ºÁUÀÆ NzÀ¯ÁzÀ (2), (3), (4) ªÀÄvÀÄÛ (5)gÀ ¸ÀPÁðj DzÉñÀUÀ¼À°è PÀ£ÁðlPÀ ±Á¸ÀPÀgÀ ¸ÀܽÃAiÀÄ

¥ÀæzÉñÁ©üªÀÈ¢Þ AiÉÆÃd£ÉAiÀÄr 2013-14£Éà ¸Á°UÉ FªÀgÉUÉ vÀ¯Á gÀÆ.146.40 ®PÀëUÀ¼ÀAvÉ MlÄÖ gÀÆ.43430.56 ®PÀëUÀ¼À£ÀÄß ¸ÉÃj¹ FªÀgÉUÉ

MlÄÖ gÀÆ.44978.08 ®PÀëUÀ¼À£ÀÄß ©qÀÄUÀqÉ ªÀiÁqÀ¯ÁVzÉ.

2013-14£Éà ¸Á°£À CAwªÀÄ PÀAw£À C£ÀÄzÁ£ÀªÁV vÀ¯Á gÀÆ.50.00 ®PÀëUÀ¼ÀAvÉ gÀÆ.14850.00 ®PÀëUÀ¼À£ÀÄß ©qÀÄUÀqÉUÉÆ½¸À®Ä

¸ÀPÁðgÀªÀÅ GzÉÝò¹zÉ. CzÀgÀAvÉ F PɼÀPÀAqÀ DzÉñÀ.

¨sÁUÀ 1

PÀ£ÁðlPÀ gÁdå¥ÀvÀæ, UÀÄgÀĪÁgÀ, K¦æ¯ï 17, 2014

659

¸ÀPÁðj DzÉñÀ ¸ÀASÉå: AiÉÆÃE 36 AiÉÆÃ«« 2013, ¨ÉAUÀ¼ÀÆgÀÄ, ¢£ÁAPÀ: 04-03-2014.

PÀ£ÁðlPÀ

±Á¸ÀPÀgÀ

¸ÀܽÃAiÀÄ

¥ÀæzÉñÁ©üªÀÈ¢Þ

AiÉÆÃd£ÉAiÀÄr

2013-14£ÉÃ

¸Á°£À

CAwªÀÄ

PÀAw£À

C£ÀÄzÁ£ÀªÁV

C£ÀħAzsÀ-1gÀ°è ¸ÀÆa¹gÀĪÀ «zsÁ£À¸À¨sÁ PÉëÃvÀæUÀ½UÉ ªÀÄvÀÄÛ C£ÀħAzsÀ-2gÀ°è ¸ÀÆa¹gÀĪÀ «zsÁ£À ¥ÀjµÀvï ¸ÀzÀ¸ÀågÀÄUÀ¼À PÉëÃvÀæUÀ½UÉ vÀ¯Á

gÀÆ.50.00 ®PÀë (LªÀvÀÄÛ ®PÀë gÀÆ¥Á¬ÄUÀ¼ÀÄ ªÀiÁvÀæ)UÀ¼ÀAvÉ MlÄÖ gÀÆ.14850.00 ®PÀë (MAzÀÄ £ÀÆgÀ £À®ªÀvÉÛAlÄ PÉÆÃn LªÀvÀÄÛ ®PÀë

gÀÆ¥Á¬ÄUÀ¼ÀÄ ªÀiÁvÀæ) UÀ¼À£ÀÄß ¸ÀA§AzsÀ¥ÀlÖ f¯Áè¢üPÁjUÀ½UÉ F PɼÀPÀAqÀ ¯ÉPÀ̲öðPÉUÀ¼Àr ©qÀÄUÀqÉ ªÀiÁrzÉ.

(gÀÆ.®PÀëUÀ¼À°è)

PÀæ.¸ÀA.

¯ÉPÀÌ ²Ã¶ðPÉ (AiÉÆÃd£É)

FªÀgÉUÉ

©qÀÄUÀqÉUÉÆ½¹zÀ

C£ÀÄzÁ£À

¥Àæ¸ÀÄÛvÀ

©qÀÄUÀqÉUÉÆ½¸ÀÄwÛgÀĪÀ

C£ÀÄzÁ£À

MlÄÖ

©qÀÄUÀqÉUÉÆ½¹zÀ

C£ÀÄzÁ£À

1

2575-60-265-0-02-059

(EvÀgÉ ªÉZÀÑ)

133.69

- -

133.69

2

4575-60-800-0-01-132

(§AqÀªÁ¼À ªÉZÀÑ)

25902.94

8577.36

34480.30

3

4575-60-800-0-01-422

(«±ÉõÀ WÀlPÀ AiÉÆÃd£É)

13858.18

4588.65

18446.83

4

4575-60-800-0-01-423

(Vjd£À G¥ÀAiÉÆÃd£É)

5083.27

1683.99

6767.26

MlÄÖ

44978.08

14850.00

59828.08

©qÀÄUÀqÉAiÀiÁzÀ F C£ÀÄzÁ£ÀªÀ£ÀÄß f¯Áè¢üPÁjUÀ¼À ªÉÊAiÀÄQÛPÀ oÉêÀt SÁvÉAiÀİèlÄÖPÉÆAqÀÄ CUÀvÀåvÉUÉ C£ÀÄUÀÄtªÁV RZÀÄð

ªÀiÁqÀvÀPÀÌzÀÄÝ.

f¯Áè¢üPÁjUÀ¼ÀÄ DAiÀiÁ ±Á¸ÀPÀjAzÀ QæAiÀiÁ AiÉÆÃd£ÉAiÀÄ£ÀÄß ¥ÀqÉzÀÄ C¢üPÀÈvÀ eÁÕ¥À£À ¸ÀASÉå:AiÉÆÃE 39 AiÉÆÃ«« 2012 (¨sÁ),

¢£ÁAPÀ: 10-07-2012gÀ£ÀéAiÀÄ ªÀÄvÀÄÛ vÀzÀ£ÀAvÀgÀ ºÉÆgÀr¹zÀ ªÀiÁUÀð¸ÀÆaUÀ¼À£ÀéAiÀÄ C£ÀĵÁÖ£ÀUÉÆ½¸ÀvÀPÀÌzÀÄÝ.

PÁªÀÄUÁjUÀ¼À£ÀÄß C£ÀĵÁÖ£ÀUÉÆ½¸ÀĪÀ ªÀÄÄ£Àß ¥ÀjµÀÌøvÀ ªÀiÁUÀð¸ÀÆaAiÀÄ PÀArPÉ 3.15 gÀ£ÀéAiÀÄ CUÀvÀå PÀæªÀÄ PÉÊUÉÆ¼ÀîvÀPÀÌzÀÄÝ.

¤AiÀĪÀiÁ£ÀĸÁgÀ ºÀt §¼ÀPÉ ¥ÀæªÀiÁt ¥ÀvÀæªÀ£ÀÄß DAiÀiÁ f¯Áè¢üPÁjUÀ¼À ªÉÄÃ®Ä ¸À»AiÉÆA¢UÉ ¸ÀPÁðgÀPÉÌ ¸À°è¸ÀĪÀÅzÀÄ. ©qÀÄUÀqÉ

ªÀiÁrzÀ C£ÀÄzÁ£ÀªÀ£ÀÄß ¤UÀ¢vÀ CªÀ¢üAiÀÄ°è §¼ÀPÉ ªÀiÁrPÉÆ¼ÀîvÀPÀÌzÀÄÝ.

F DzÉñÀªÀ£ÀÄß DyðPÀ E¯ÁSÉAiÀÄ »A§gÀºÀ ¸ÀASÉå: DE 344/ªÉZÀÑ-06/2013, ¢£ÁAPÀ: 03-03-2014gÀ°è ¤ÃrgÀĪÀ

¸ÀºÀªÀÄwAiÀÄ ªÉÄÃgÉUÉ ºÉÆgÀr¸À¯ÁVzÉ.

PÀ£ÁðlPÀ gÁdå¥Á®gÀ DeÁÕ£ÀĸÁgÀ ªÀÄvÀÄÛ CªÀgÀ ºÉ¸Àj£À°è,

J¸ï.GªÀiÁªÀw,

¸ÀPÁðgÀzÀ C¢üãÀ PÁAiÀÄðzÀ²ð-1 & 2,

AiÉÆÃd£É, PÁAiÀÄðPÀæªÀÄ ¸ÀAAiÉÆÃd£É ªÀÄvÀÄÛ ¸ÁATåPÀ E¯ÁSÉ.

¸ÀPÁðj DzÉñÀ ¸ÀASÉå: AiÉÆÃE 36 AiÉÆÃ«« 2013, ¨ÉAUÀ¼ÀÆgÀÄ, ¢£ÁAPÀ: 04-03-2014gÀ C£ÀħAzsÀ-1

(gÀÆ.®PÀëUÀ¼À°è)

PÀæªÀÄ

¸ÀASÉå

«zsÁ£À¸À¨sÁ PÉëÃvÀæUÀ¼ÀÄ

¯ÉPÀÌ ²Ã¶ðPÉ 4575-60-800-0-01

MlÄÖ

132

422

423

1)

©ÃzÀgï f¯Éè «zsÁ£À¸À¨sÁ PÉëÃvÀæUÀ¼ÀÄ

1

©ÃzÀgï zÀQët

28.88

15.45

5.67

50.00

2

©ÃzÀgï GvÀÛgÀ

28.88

15.45

5.67

50.00

3

ºÀĪÀiÁߨÁzï

28.88

15.45

5.67

50.00

4

§¸ÀªÀPÀ¯Áåt

28.88

15.45

5.67

50.00

5

¨sÁ°Ì

28.88

15.45

5.67

50.00

6

OgÁzï

28.88

15.45

5.67

50.00

MlÄÖ

173.28

92.70

34.02

300.00

PÀ£ÁðlPÀ gÁdå¥ÀvÀæ, UÀÄgÀĪÁgÀ, K¦æ¯ï 17, 2014

¨sÁUÀ 1

660

(gÀÆ.®PÀëUÀ¼À°è)

PÀæªÀÄ

¸ÀASÉå

«zsÁ£À¸À¨sÁ PÉëÃvÀæUÀ¼ÀÄ

¯ÉPÀÌ ²Ã¶ðPÉ 4575-60-800-0-01

MlÄÖ

132

422

423

2)

§¼Áîj f¯Éè «zsÁ£À¸À¨sÁ PÉëÃvÀæUÀ¼ÀÄ

1

¹gÀUÀÄ¥Àà

28.88

15.45

5.67

50.00

2

§¼Áîj £ÀUÀgÀ

28.88

15.45

5.67

50.00

3

§¼Áîj («ÄÃ)

28.88

15.45

5.67

50.00

4

«dAiÀÄ£ÀUÀgÀ

28.88

15.45

5.67

50.00

5

¸ÀAqÀÆgÀÄ («ÄÃ)

28.88

15.45

5.67

50.00

6

PÀÆqÀèV («ÄÃ)

28.88

15.45

5.67

50.00

7

PÀA¦è («ÄÃ)

28.88

15.45

5.67

50.00

8

ºÀÆ«£À ºÀqÀUÀ° («ÄÃ)

28.88

15.45

5.67

50.00

9

ºÀUÀj¨ÉƪÀÄä£ÀºÀ½î («ÄÃ)

28.88

15.45

5.67

50.00

MlÄÖ

259.92

139.05

51.03

450.00

3)

avÀæzÀÄUÀð f¯Éè «zsÁ£À¸À¨sÁ PÉëÃvÀæUÀ¼ÀÄ

1

avÀæzÀÄUÀð

28.88

15.45

5.67

50.00

2

ªÉƼÀPÁ®ÆägÀÄ

28.88

15.45

5.67

50.00

3

ZÀ¼ÀîPÉgÉ

28.88

15.45

5.67

50.00

4

»jAiÀÄÆgÀÄ

28.88

15.45

5.67

50.00

5

ºÉƼÀ¯ÉÌgÉ

28.88

15.45

5.67

50.00

6

ºÉƸÀzÀÄUÀð

28.88

15.45

5.67

50.00

MlÄÖ

173.28

92.70

34.02

300.00

4)

zÁªÀtUÉgÉ f¯Éè «zsÁ£À¸À¨sÁ PÉëÃvÀæUÀ¼ÀÄ

1

ºÀgÀ¥À£ÀºÀ½î

28.88

15.45

5.67

50.00

2

ºÀjºÀgÀ

28.88

15.45

5.67

50.00

3

zÁªÀtUÉgÉ zÀQët

28.88

15.45

5.67

50.00

4

zÁªÀtUÉgÉ GvÀÛgÀ

28.88

15.45

5.67

50.00

5

ªÀiÁAiÀÄPÉÆAqÀ

28.88

15.45

5.67

50.00

6

dUÀ¼ÀÆgÀÄ

28.88

15.45

5.67

50.00

7

ZÉ£ÀßVj

28.88

15.45

5.67

50.00

8

ºÉÆ£Áß½

28.88

15.45

5.67

50.00

MlÄÖ

231.04

123.60

45.36

400.00

5)

UÀÄ®âUÀð f¯Éè «zsÁ£À¸À¨sÁ PÉëÃvÀæUÀ¼ÀÄ

1

aAZÉÆÃ½ («ÄÃ)

28.88

15.45

5.67

50.00

2

UÀÄ®âUÀð zÀQët

28.88

15.45

5.67

50.00

3

D¼ÀAzÀ

28.88

15.45

5.67

50.00

4

UÀÄ®âUÀð GvÀÛgÀ

28.88

15.45

5.67

50.00

5

UÀÄ®âUÀð UÁæ«ÄÃt («ÄÃ)

28.88

15.45

5.67

50.00

¨sÁUÀ 1

PÀ£ÁðlPÀ gÁdå¥ÀvÀæ, UÀÄgÀĪÁgÀ, K¦æ¯ï 17, 2014

661

(gÀÆ.®PÀëUÀ¼À°è)

PÀæªÀÄ

¸ÀASÉå

«zsÁ£À¸À¨sÁ PÉëÃvÀæUÀ¼ÀÄ

¯ÉPÀÌ ²Ã¶ðPÉ 4575-60-800-0-01

MlÄÖ

132

422

423

6

C¥sÀd¯ï ¥ÀÄgÀ

28.88

15.45

5.67

50.00

7

¸ÉÃqÀA

28.88

15.45

5.67

50.00

8

eÉêÀVð

28.88

15.45

5.67

50.00

9

avÁÛ¥ÀÄgÀ

28.88

15.45

5.67

50.00

MlÄÖ

259.92

139.05

51.03

450.00

6)

AiÀiÁzÀVgï f¯Éè «zsÁ£À¸À¨sÁ PÉëÃvÀæUÀ¼ÀÄ

1

AiÀiÁzÀVgï

28.88

15.45

5.67

50.00

2

±ÀºÁ¥ÀÄgÀ

28.88

15.45

5.67

50.00

3

¸ÀÄgÀ¥ÀÄgÀ («ÄÃ)

28.88

15.45

5.67

50.00

4

UÀÄgÀÄ«Äl̯ï

28.88

15.45

5.67

50.00

MlÄÖ

115.52

61.80

22.68

200.00

7)

gÁAiÀÄZÀÆgÀÄ f¯Éè «zsÁ£À¸À¨sÁ PÉëÃvÀæUÀ¼ÀÄ

1

zÉêÀzÀÄUÀð («ÄÃ)

28.88

15.45

5.67

50.00

2

gÁAiÀÄZÀÆgÀÄ

28.88

15.45

5.67

50.00

3

gÁAiÀÄZÀÆgÀÄ UÁæ«ÄÃt («ÄÃ)

28.88

15.45

5.67

50.00

4

ªÀiÁ¤é («ÄÃ)

28.88

15.45

5.67

50.00

5

°AUÀ¸ÀÄUÀÆgÀÄ («ÄÃ)

28.88

15.45

5.67

50.00

6

¹AzsÀ£ÀÆgÀÄ

28.88

15.45

5.67

50.00

7

ªÀÄ¹Ì («ÄÃ)

28.88

15.45

5.67

50.00

MlÄÖ

202.16

108.15

39.69

350.00

8)

PÉÆ¥Àà¼À f¯Éè «zsÁ£À¸À¨sÁ PÉëÃvÀæUÀ¼ÀÄ

1

PÀĵÀÖV

28.88

15.45

5.67

50.00

2

AiÀÄ®§ÄUÀð

28.88

15.45

5.67

50.00

3

PÀ£ÀPÀVj («ÄÃ)

28.88

15.45

5.67

50.00

4

UÀAUÁªÀw

28.88

15.45

5.67

50.00

5

PÉÆ¥Àà¼À

28.88

15.45

5.67

50.00

MlÄÖ

140.00

77.25

28.35

250.00

9)

PÉÆÃ¯ÁgÀ f¯Éè «zsÁ£À¸À¨sÁ PÉëÃvÀæUÀ¼ÀÄ

1

²æÃ¤ªÁ¸À¥ÀÄgÀ

28.88

15.45

5.67

50.00

2

ªÀÄļÀĨÁV®Ä

28.88

15.45

5.67

50.00

3

PÉ.f.J¥sï

28.88

15.45

5.67

50.00

4

PÉÆÃ¯ÁgÀ

28.88

15.45

5.67

50.00

5

§AUÁgÀÄ¥ÉÃmÉ

28.88

15.45

5.67

50.00

6

ªÀiÁ®ÆgÀÄ

28.88

15.45

5.67

50.00

MlÄÖ

173.28

92.70

34.02

300.00

PÀ£ÁðlPÀ gÁdå¥ÀvÀæ, UÀÄgÀĪÁgÀ, K¦æ¯ï 17, 2014

¨sÁUÀ 1

662

(gÀÆ.®PÀëUÀ¼À°è)

PÀæªÀÄ

¸ÀASÉå

«zsÁ£À¸À¨sÁ PÉëÃvÀæUÀ¼ÀÄ

¯ÉPÀÌ ²Ã¶ðPÉ 4575-60-800-0-01

MlÄÖ

132

422

423

10)

aPÀ̧¼Áî¥ÀÄgÀ f¯Éè «zsÁ£À¸À¨sÁ PÉëÃvÀæUÀ¼ÀÄ

1

aPÀ̧¼Áî¥ÀÄgÀ

28.88

15.45

5.67

50.00

2

aAvÁªÀÄtÂ

28.88

15.45

5.67

50.00

3

²qÀèWÀlÖ

28.88

15.45

5.67

50.00

4

¨ÁUÉÃ¥À°è

28.88

15.45

5.67

50.00

5

UËj©zÀ£ÀÆgÀÄ

28.88

15.45

5.67

50.00

MlÄÖ

144.40

77.25

28.35

250.00

11)

vÀĪÀÄPÀÆgÀÄ f¯Éè «zsÁ£À¸À¨sÁ PÉëÃvÀæUÀ¼ÀÄ

1

¥ÁªÀUÀqÀ

28.88

15.45

5.67

50.00

2

²gÁ

28.88

15.45

5.67

50.00

3

vÀĪÀÄPÀÆgÀÄ UÁæªÀiÁAvÀgÀ

28.88

15.45

5.67

50.00

4

ªÀÄzsÀÄVj

28.88

15.45

5.67

50.00

5

PÉÆgÀlUÉgÉ («ÄÃ)

28.88

15.45

5.67

50.00

6

vÀĪÀÄPÀÆgÀÄ £ÀUÀgÀ

28.88

15.45

5.67

50.00

7

PÀÄtÂUÀ¯ï

28.88

15.45

5.67

50.00

8

UÀÄ©â

28.88

15.45

5.67

50.00

9

vÀÄgÀĪÉÃPÉgÉ

28.88

15.45

5.67

50.00

10

w¥ÀlÆgÀÄ

28.88

15.45

5.67

50.00

11

aPÀÌ£ÁAiÀÄPÀ£À ºÀ½î

28.88

15.45

5.67

50.00

MlÄÖ

317.68

169.95

62.37

550.00

12)

gÁªÀÄ£ÀUÀgÀ f¯Éè «zsÁ£À¸À¨sÁ PÉëÃvÀæUÀ¼ÀÄ

1

PÀ£ÀPÀ¥ÀÄgÀ

28.88

15.45

5.67

50.00

2

ªÀiÁUÀr

28.88

15.45

5.67

50.00

3

gÁªÀÄ£ÀUÀgÀ

28.88

15.45

5.67

50.00

4

ZÀ£ÀߥÀlÖt

28.88

15.45

5.67

50.00

MlÄÖ

115.52

61.80

22.68

200.00

13)

¨ÉAUÀ¼ÀÆgÀÄ £ÀUÀgÀ f¯Éè «zsÁ£À¸À¨sÁ

PÉëÃvÀæUÀ¼ÀÄ

1

ªÀįÉèñÀégÀA

28.88

15.45

5.67

50.00

2

gÁeÁf£ÀUÀgÀ

28.88

15.45

5.67

50.00

3

UÁA¢üãÀUÀgÀ

28.88

15.45

5.67

50.00

4

aPÀÌ¥ÉÃmÉ

28.88

15.45

5.67

50.00

5

zÁ¸ÀgÀºÀ½î

28.88

15.45

5.67

50.00

6

ZÁªÀÄgÁd¥ÉÃmÉ

28.88

15.45

5.67

50.00

7

§¸ÀªÀ£ÀUÀÄr

28.88

15.45

5.67

50.00

¨sÁUÀ 1

PÀ£ÁðlPÀ gÁdå¥ÀvÀæ, UÀÄgÀĪÁgÀ, K¦æ¯ï 17, 2014

663

(gÀÆ.®PÀëUÀ¼À°è)

PÀæªÀÄ

¸ÀASÉå

«zsÁ£À¸À¨sÁ PÉëÃvÀæUÀ¼ÀÄ

¯ÉPÀÌ ²Ã¶ðPÉ 4575-60-800-0-01

MlÄÖ

132

422

423

8

dAiÀÄ£ÀUÀgÀ

28.88

15.45

5.67

50.00

9

ªÀĺÁ®Qëöäà ¯ÉÃOmï

28.88

15.45

5.67

50.00

10

ºÉ¨Áâ¼À

28.88

15.45

5.67

50.00

11

¥ÀİPÉò £ÀUÀgÀ («ÄÃ)

28.88

15.45

5.67

50.00

12

AiÀÄ®ºÀAPÀ

28.88

15.45

5.67

50.00

13

«dAiÀÄ £ÀUÀgÀ

28.88

15.45

5.67

50.00

14

¥ÀzÀä£Á¨sÀ£ÀUÀgÀ

28.88

15.45

5.67

50.00

15

C£ÉÃPÀ¯ï («ÄÃ)

28.88

15.45

5.67

50.00

16

¨ÉAUÀ¼ÀÆgÀÄ zÀQët

28.88

15.45

5.67

50.00

17

PÉ.Dgï.¥ÀÄgÀA

28.88

15.45

5.67

50.00

18

¨ÉƪÀÄä£ÀºÀ½î

28.88

15.45

5.67

50.00

19

¨ÁålgÁAiÀÄ£À¥ÀÄgÀ

28.88

15.45

5.67

50.00

20

AiÀıÀªÀAvÀ¥ÀÄgÀ

28.88

15.45

5.67

50.00

21

gÁdgÁeÉñÀéj £ÀUÀgÀ

28.88

15.45

5.67

50.00

22

©.n.JA. ¯ÉÃOmï

28.88

15.45

5.67

50.00

23

ªÀĺÀzÉêÀ¥ÀÄgÀ («ÄÃ)

28.88

15.45

5.67

50.00

24

¸ÀªÀðdÕ £ÀUÀgÀ

28.88

15.45

5.67

50.00

25

±ÁAw£ÀUÀgÀ

28.88

15.45

5.67

50.00

26

¹.«.gÁªÀÄ£ï£ÀUÀgÀ («ÄÃ)

28.88

15.45

5.67

50.00

27

²ªÁf£ÀUÀgÀ

28.88

15.45

5.67

50.00

28

UÉÆÃ«AzÀgÁd£ÀUÀgÀ

28.88

15.45

5.67

50.00

MlÄÖ

808.64

432.60

158.76

1400.00

14)

¨ÉAUÀ¼ÀÆgÀÄ

UÁæªÀiÁAvÀgÀ

f¯Éè

«zsÁ£À¸À¨sÁ PÉëÃvÀæUÀ¼ÀÄ

1

£É®ªÀÄAUÀ®

28.88

15.45

5.67

50.00

2

zÉÆqÀا¼Áî¥ÀÄgÀ

28.88

15.45

5.67

50.00

3

zÉêÀ£ÀºÀ½î

28.88

15.45

5.67

50.00

4

ºÉƸÀPÉÆÃmÉ

28.88

15.45

5.67

50.00

MlÄÖ

115.52

61.80

22.68

200.00

15)

ªÉÄʸÀÆgÀ f¯Éè «zsÁ£À¸À¨sÁ PÉëÃvÀæUÀ¼ÀÄ

1

n.£ÀgÀ¹Ã¥ÀÄgÀ («ÄÃ)

28.88

15.45

5.67

50.00

2

PÀȵÀgÁd

28.88

15.45

5.67

50.00

3

ZÁªÀÄgÁd

28.88

15.45

5.67

50.00

4

£ÀgÀ¹AºÀgÁd

28.88

15.45

5.67

50.00

5

ZÁªÀÄÄAqÉñÀéj

28.88

15.45

5.67

50.00

PÀ£ÁðlPÀ gÁdå¥ÀvÀæ, UÀÄgÀĪÁgÀ, K¦æ¯ï 17, 2014

¨sÁUÀ 1

664

(gÀÆ.®PÀëUÀ¼À°è)

PÀæªÀÄ

¸ÀASÉå

«zsÁ£À¸À¨sÁ PÉëÃvÀæUÀ¼ÀÄ

¯ÉPÀÌ ²Ã¶ðPÉ 4575-60-800-0-01

MlÄÖ

132

422

423

6

£ÀAd£ÀUÀÆqÀÄ («ÄÃ)

28.88

15.45

5.67

50.00

7

ºÉZï.r.PÉÆÃmÉ («ÄÃ)

28.88

15.45

5.67

50.00

8

ºÀÄt¸ÀÆgÀÄ

28.88

15.45

5.67

50.00

9

ªÀgÀÄt

28.88

15.45

5.67

50.00

10

PÀȵÀÚgÁd£ÀUÀgÀ

28.88

15.45

5.67

50.00

11

¦jAiÀiÁ¥ÀlÖt

28.88

15.45

5.67

50.00

MlÄÖ

317.68

169.95

62.37

550.00

16)

ªÀÄAqÀå f¯ÉèAiÀÄ «zsÁ£À¸À¨sÁ PÉëÃvÀæUÀ¼ÀÄ

1

£ÁUÀªÀÄAUÀ®

28.88

15.45

5.67

50.00

2

ªÀÄzÀÆÝgÀÄ

28.88

15.45

5.67

50.00

3

ªÉÄîÄPÉÆÃmÉ

28.88

15.45

5.67

50.00

4

ªÀļÀªÀ½î («ÄÃ)

28.88

15.45

5.67

50.00

5

ªÀÄAqÀå

28.88

15.45

5.67

50.00

6

PÉ.Dgï.¥ÉÃmÉ

28.88

15.45

5.67

50.00

7

²æÃgÀAUÀ¥ÀlÖt

28.88

15.45

5.67

50.00

MlÄÖ

202.16

108.15

39.69

350.00

17)

ZÁªÀÄgÁd£ÀUÀgÀ f¯ÉèAiÀÄ «zsÁ£À¸À¨sÁ

PÉëÃvÀæUÀ¼ÀÄ

1

ºÀ£ÀÆgÀÄ

28.88

15.45

5.67

50.00

2

PÉÆ¼ÉîÃUÁ®

28.88

15.45

5.67

50.00

3

ZÁªÀÄgÁd£ÀUÀgÀ

28.88

15.45

5.67

50.00

4

UÀÄAqÀÄè¥ÉÃmÉ

28.88

15.45

5.67

50.00

MlÄÖ

115.52

61.80

22.68

200.00

18)

PÉÆqÀUÀÄ f¯ÉèAiÀÄ «zsÁ£À¸À¨sÁ PÉëÃvÀæUÀ¼ÀÄ

1

«gÁd¥ÉÃmÉ

28.88

15.45

5.67

50.00

2

ªÀÄrPÉÃj

28.88

15.45

5.67

50.00

MlÄÖ

57.76

30.90

11.34

100.00

19)

zÀQët

PÀ£ÀßqÀ

f¯ÉèAiÀÄ

«zsÁ£À¸À¨sÁ

PÉëÃvÀæUÀ¼ÀÄ

1

¸ÀļÀå

28.88

15.45

5.67

50.00

2

¥ÀÄvÀÆÛgÀÄ

28.88

15.45

5.67

50.00

3

¨É¼ÀÛAUÀr

28.88

15.45

5.67

50.00

4

§AmÁé¼À

28.88

15.45

5.67

50.00

5

ªÀÄAUÀ¼ÀÆgÀÄ

28.88

15.45

5.67

50.00

6

ªÀÄAUÀ¼ÀÆgÀÄ £ÀUÀgÀ

28.88

15.45

5.67

50.00

¨sÁUÀ 1

PÀ£ÁðlPÀ gÁdå¥ÀvÀæ, UÀÄgÀĪÁgÀ, K¦æ¯ï 17, 2014

665

(gÀÆ.®PÀëUÀ¼À°è)

PÀæªÀÄ

¸ÀASÉå

«zsÁ£À¸À¨sÁ PÉëÃvÀæUÀ¼ÀÄ

¯ÉPÀÌ ²Ã¶ðPÉ 4575-60-800-0-01

MlÄÖ

132

422

423

7

ªÀÄAUÀ¼ÀÆgÀÄ zÀQët

28.88

15.45

5.67

50.00

8

ªÀÄÆqÀ©¢æ

28.88

15.45

5.67

50.00

MlÄÖ

231.04

123.60

45.36

400.00

20)

GqÀĦ f¯ÉèAiÀÄ «zsÁ£À¸À¨sÁ PÉëÃvÀæUÀ¼ÀÄ

1

PÁ¥ÀÄ

28.88

15.45

5.67

50.00

2

GqÀĦ

28.88

15.45

5.67

50.00

3

PÀÄAzÁ¥ÀÄgÀ

28.88

15.45

5.67

50.00

4

¨ÉÊAzÀÆgÀÄ

28.88

15.45

5.67

50.00

5

PÁPÀð¼À

28.88

15.45

5.67

50.00

MlÄÖ

144.40

77.25

28.35

250.00

21)

²ªÀªÉÆUÀÎ f¯ÉèAiÀÄ «zsÁ£À¸À¨sÁ PÉëÃvÀæUÀ¼ÀÄ

1

²ªÀªÉÆUÀÎ UÁæªÀiÁAvÀgÀ

28.88

15.45

5.67

50.00

2

¨sÀzÁæªÀw

28.88

15.45

5.67

50.00

3

²ªÀªÉÆUÀÎ

28.88

15.45

5.67

50.00

4

wÃxÀðºÀ½î

28.88

15.45

5.67

50.00

5

¸ÁUÀgÀ

28.88

15.45

5.67

50.00

6

¸ÉÆgÀ§

28.88

15.45

5.67

50.00

7

²PÁj¥ÀÄgÀ

28.88

15.45

5.67

50.00

MlÄÖ

202.16

108.15

39.69

350.00

22)

zsÁgÀªÁqÀ f¯ÉèAiÀÄ «zsÁ£À¸À¨sÁ PÉëÃvÀæUÀ¼ÀÄ

1

zsÁgÀªÁqÀ

28.88

15.45

5.67

50.00

2

ºÀħâ½î-zsÁgÀªÁqÀ (¥À²ÑªÀÄ)

28.88

15.45

5.67

50.00

3

ºÀħâ½î-zsÁgÀªÁqÀ (¥ÀƪÀð) («ÄÃ)

28.88

15.45

5.67

50.00

4

ºÀħâ½î-zsÁgÀªÁqÀ PÉÃAzÀæ

28.88

15.45

5.67

50.00

5

PÀ®WÀlV

28.88

15.45

5.67

50.00

6

PÀÄAzÀUÉÆÃ¼À

28.88

15.45

5.67

50.00

7

£ÀªÀ®UÀÄAzÀ

28.88

15.45

5.67

50.00

MlÄÖ

202.16

108.15

39.69

350.00

23)

ºÁªÉÃj f¯Éè «zsÁ£À¸À¨sÁ PÉëÃvÀæUÀ¼ÀÄ

1

²UÁÎAªï

28.88

15.45

5.67

50.00

2

ºÁ£ÀUÀ¯ï

28.88

15.45

5.67

50.00

3

»gÉÃPÉgÀÆgÀÄ

28.88

15.45

5.67

50.00

4

gÁt¨ɣÀÆßgÀÄ

28.88

15.45

5.67

50.00

PÀ£ÁðlPÀ gÁdå¥ÀvÀæ, UÀÄgÀĪÁgÀ, K¦æ¯ï 17, 2014

¨sÁUÀ 1

666

(gÀÆ.®PÀëUÀ¼À°è)

PÀæªÀÄ

¸ÀASÉå

«zsÁ£À¸À¨sÁ PÉëÃvÀæUÀ¼ÀÄ

¯ÉPÀÌ ²Ã¶ðPÉ 4575-60-800-0-01

MlÄÖ

132

422

423

5

ºÁªÉÃj

28.88

15.45

5.67

50.00

6

¨ÁåqÀV

28.88

15.45

5.67

50.00

MlÄÖ

173.28

92.70

34.02

300.00

24)

©eÁ¥ÀÄgÀ f¯ÉèAiÀÄ «zsÁ£À¸À¨sÁ PÉëÃvÀæUÀ¼ÀÄ

1

ªÀÄÄzÉÝéºÁ¼À

28.88

15.45

5.67

50.00

2

zÉêÀgÀ»¥ÀàgÀV

28.88

15.45

5.67

50.00

3

§¸ÀªÀ£À ¨ÁUÉêÁr

28.88

15.45

5.67

50.00

4

£ÁUÀoÁt («ÄÃ)

28.88

15.45

5.67

50.00

5

©eÁ¥ÀÄgÀ £ÀUÀgÀ

28.88

15.45

5.67

50.00

6

§§¯ÉñÀégÀ

28.88

15.45

5.67

50.00

7

EAr

28.88

15.45

5.67

50.00

8

¹AzÀV

28.88

15.45

5.67

50.00

MlÄÖ

231.04

123.60

45.36

400.00

25)

¨ÁUÀ®PÉÆÃmÉ

f¯ÉèAiÀÄ

«zsÁ£À¸À¨sÁ

PÉëÃvÀæUÀ¼ÀÄ

1

dªÀÄRAr

28.88

15.45

5.67

50.00

2

©Ã¼ÀV

28.88

15.45

5.67

50.00

3

ªÀÄÄzsÉÆÃ¼À

28.88

15.45

5.67

50.00

4

¨ÁUÀ®PÉÆÃmÉ

28.88

15.45

5.67

50.00

5

¨ÁzÁ«Ä

28.88

15.45

5.67

50.00

6

vÉÃgÀzÁ¼À

28.88

15.45

5.67

50.00

7

ºÀÄ£ÀUÀÄAzÀ

28.88

15.45

5.67

50.00

MlÄÖ

202.16

108.15

39.69

350.00

26)

aPÀ̪ÀÄUÀ¼ÀÆgÀÄ

f¯ÉèAiÀÄ

«zsÁ£À¸À¨sÁ

PÉëÃvÀæUÀ¼ÀÄ

1

aPÀ̪ÀÄUÀ¼ÀÆgÀÄ

28.88

15.45

5.67

50.00

2

PÀqÀÆgÀÄ

28.88

15.45

5.67

50.00

3

ªÀÄÆrUÉgÉ

28.88

15.45

5.67

50.00

4

±ÀÈAUÉÃj

28.88

15.45

5.67

50.00

5

vÀjÃPÉgÉ

28.88

15.45

5.67

50.00

MlÄÖ

144.40

77.25

28.35

250.00

27)

GvÀÛgÀ

PÀ£ÀßqÀ

f¯ÉèAiÀÄ

«zsÁ£À¸À¨sÁ

PÉëÃvÀæUÀ¼ÀÄ

1

²gÀ¹

28.88

15.45

5.67

50.00

2

¨sÀl̼ï

28.88

15.45

5.67

50.00

¨sÁUÀ 1

PÀ£ÁðlPÀ gÁdå¥ÀvÀæ, UÀÄgÀĪÁgÀ, K¦æ¯ï 17, 2014

667

(gÀÆ.®PÀëUÀ¼À°è)

PÀæªÀÄ

¸ÀASÉå

«zsÁ£À¸À¨sÁ PÉëÃvÀæUÀ¼ÀÄ

¯ÉPÀÌ ²Ã¶ðPÉ 4575-60-800-0-01

MlÄÖ

132

422

423

3

PÀĪÀÄÄmÁ

28.88

15.45

5.67

50.00

4

AiÀįÁè¥ÀÄgÀ

28.88

15.45

5.67

50.00

5

ºÀ½AiÀiÁ¼À

28.88

15.45

5.67

50.00

6

PÁgÀªÁgÀ

28.88

15.45

5.67

50.00

MlÄÖ

173.28

92.70

34.02

300.00

28)

UÀzÀUÀ f¯ÉèAiÀÄ «zsÁ£À¸À¨sÁ PÉëÃvÀæUÀ¼ÀÄ

1

²gÀºÀnÖ

28.88

15.45

5.67

50.00

2

UÀzÀUÀ

28.88

15.45

5.67

50.00

3

gÉÆÃt

28.88

15.45

5.67

50.00

4

£ÀgÀUÀÄAzÀ

28.88

15.45

5.67

50.00

MlÄÖ

115.52

61.80

22.68

200.00

29)

¨É¼ÀUÁA f¯ÉèAiÀÄ «zsÁ£À¸À¨sÁ PÉëÃvÀæUÀ¼ÀÄ

1

¨É¼ÀUÁA GvÀÛgÀ

28.88

15.45

5.67

50.00

2

¨É¼ÀUÁA zÀQët

28.88

15.45

5.67

50.00

3

¨É¼ÀUÁA UÁæªÀiÁAvÀgÀ

28.88

15.45

5.67

50.00

4

PÀÄqÀa

28.88

15.45

5.67

50.00

5

AiÀĪÀÄPÀ£ÀªÀÄgÀr

28.88

15.45

5.67

50.00

6

aPÉÆÌÃr-¸ÀzÀ®UÀ

28.88

15.45

5.67

50.00

7

gÁAiÀĨsÁUÀ

28.88

15.45

5.67

50.00

8

PÁUÀªÁqÀ

28.88

15.45

5.67

50.00

9

CxÀtÂ

28.88

15.45

5.67

50.00

10

UÉÆÃPÁPï

28.88

15.45

5.67

50.00

11

CgÀ¨Á«

28.88

15.45

5.67

50.00

12

ºÀÄPÉÌÃj

28.88

15.45

5.67

50.00

13

QvÀÆÛgÀÄ

28.88

15.45

5.67

50.00

14

¤¥ÁàtÂ

28.88

15.45

5.67

50.00

15

SÁ£Á¥ÀÄgÀ

28.88

15.45

5.67

50.00

16

¨ÉÊ®ºÉÆAUÀ®

28.88

15.45

5.67

50.00

17

¸ÀªÀzÀwÛ J®èªÀÄä

28.88

15.45

5.67

50.00

18

gÁªÀÄzÀÄUÀð

28.88

15.45

5.67

50.00

MlÄÖ

519.84

278.10

102.06

900.00

30)

ºÁ¸À£À f¯ÉèAiÀÄ «zsÁ£À¸À¨sÁ PÉëÃvÀæUÀ¼ÀÄ

1

¨ÉîÆgÀÄ

28.88

15.45

5.67

50.00

2

CgÀ¹ÃPÉgÉ

28.88

15.45

5.67

50.00

PÀ£ÁðlPÀ gÁdå¥ÀvÀæ, UÀÄgÀĪÁgÀ, K¦æ¯ï 17, 2014

¨sÁUÀ 1

668

(gÀÆ.®PÀëUÀ¼À°è)

PÀæªÀÄ

¸ÀASÉå

«zsÁ£À¸À¨sÁ PÉëÃvÀæUÀ¼ÀÄ

¯ÉPÀÌ ²Ã¶ðPÉ 4575-60-800-0-01

MlÄÖ

132

422

423

3

±ÀæªÀt¨É¼ÀUÉÆ¼À

28.88

15.45

5.67

50.00

4

ºÉƼɣÀgÀ¹¥ÀÄgÀ

28.88

15.45

5.67

50.00

5

CgÀPÀ®UÀÆqÀÄ

28.88

15.45

5.67

50.00

6

ºÁ¸À£À

28.88

15.45

5.67

50.00

7

¸ÀPÀ¯ÉñÀ¥ÀÄgÀ

28.88

15.45

5.67

50.00

MlÄÖ

202.16

108.15

39.69

350.00

MlÄÖ ªÉÆvÀÛ

6469.12

3460.80

1270.08

11200.00

J¸ï.GªÀiÁªÀw,

¸ÀPÁðgÀzÀ C¢üãÀ PÁAiÀÄðzÀ²ð-1 & 2,

AiÉÆÃd£É, PÁAiÀÄðPÀæªÀÄ ¸ÀAAiÉÆÃd£É ªÀÄvÀÄÛ ¸ÁATåPÀ E¯ÁSÉ.

¸ÀPÁðj DzÉñÀ ¸ÀASÉå: AiÉÆÃE 36 AiÉÆÃ«« 2013, ¨ÉAUÀ¼ÀÆgÀÄ, ¢£ÁAPÀ: 04-03-2014gÀ C£ÀħAzsÀ-2

(gÀÆ.®PÀëUÀ¼À°è)

PÀæªÀÄ

¸ÀASÉå

«zsÁ£À¥ÀjµÀvï ¸ÀzÀ¸ÀågÀ ºÉ¸ÀgÀÄUÀ¼ÀÄ

(²æÃ/²æÃªÀÄw)

¯ÉPÀÌ ²Ã¶ðPÉ 4575-60-800-0-01

MlÄÖ

132

422

423

1) ©ÃzÀgï f¯Éè

1

§¸ÀªÀgÁeï ºÉZï ¥Ánïï

28.88

15.45

5.67

50.00

2

gÀWÀÄ£ÁxÀgÁªï ªÀiÁ®PÀ¥ÀÄgÉ

28.88

15.45

5.67

50.00

MlÄÖ

57.76

30.90

11.34

100.00

2) §¼Áîj f¯Éè

1

ªÀÄÈvÀÄåAdAiÀÄ f£ÀUÁ

28.88

15.45

5.67

50.00

MlÄÖ

28.88

15.45

5.67

50.00

3) avÀðzÀÄUÀð f¯Éè

1

f.gÀWÀÄ DZÁgï

28.88

15.45

5.67

50.00

MlÄÖ

28.88

15.45

5.67

50.00

4) zÁªÀtUÉgÉ f¯Éè

1

qÁ|| J.ºÉZï.²ªÀAiÉÆÃV¸Áé«Ä

28.88

15.45

5.67

50.00

MlÄÖ

28.88

15.45

5.67

50.00

5) UÀÄ®âUÁð f¯Éè

1

C®èªÀÄ ¥Àæ¨sÀÄ ¥Ánïï

28.88

15.45

5.67

50.00

2

PÉ.©.±Át¥Àà

28.88

15.45

5.67

50.00

3

CªÀÄgÀ£ÁxÀ ¥Ánïï

28.88

15.45

5.67

50.00

MlÄÖ

86.64

46.35

17.01

150.00

¨sÁUÀ 1

PÀ£ÁðlPÀ gÁdå¥ÀvÀæ, UÀÄgÀĪÁgÀ, K¦æ¯ï 17, 2014

669

(gÀÆ.®PÀëUÀ¼À°è)

PÀæªÀÄ

¸ÀASÉå

«zsÁ£À¥ÀjµÀvï ¸ÀzÀ¸ÀågÀ ºÉ¸ÀgÀÄUÀ¼ÀÄ

(²æÃ/²æÃªÀÄw)

¯ÉPÀÌ ²Ã¶ðPÉ 4575-60-800-0-01

MlÄÖ

132

422

423

6) PÉÆ¥Àà¼À f¯Éè

1

DZÁgï ºÁ®¥Àà §¸À¥Àà

28.88

15.45

5.67

50.00

MlÄÖ

28.88

15.45

5.67

50.00

7) PÉÆÃ¯ÁgÀ f¯Éè

1

£À¹Ãgï CºÀªÀÄzï

28.88

15.45

5.67

50.00

2

ªÉÊ.J.£ÁgÁAiÀÄt¸Áé«Ä

28.88

15.45

5.67

50.00

MlÄÖ

57.76

30.90

11.34

100.00

8) vÀĪÀÄPÀÆgÀÄ f¯Éè

1

dUÉÎñï

28.88

15.45

5.67

50.00

2

JA.r.®QëöäãÁgÁAiÀÄt

28.88

15.45

5.67

50.00

3

JA.Dgï.ºÀİ£ÁAiÀÄÌgï

28.88

15.45

5.67

50.00

MlÄÖ

86.64

46.35

17.01

150.00

9) gÁªÀÄ£ÀUÀgÀ f¯Éè

1

JA.«.gÁd±ÉÃRgÀ£ï

28.88

15.45

5.67

50.00

2

¸ÉÊAiÀÄzï ªÀÄÄ¢üÃgï DUÁ

28.88

15.45

5.67

50.00

MlÄÖ

57.76

30.90

11.34

100.00

10) ¨ÉAUÀ¼ÀÆgÀÄ £ÀUÀgÀ f¯Éè

1

qÁ|| zÉÆqÀØgÀAUÉÃUËqÀ

28.88

15.45

5.67

50.00

2

©.eÉ.¥ÀÄlÖ¸Áé«Ä

28.88

15.45

5.67

50.00

3

JA.Dgï.¹ÃvÁgÁªÀiï

28.88

15.45

5.67

50.00

4

r.J¸ï.«ÃgÀAiÀÄå

28.88

15.45

5.67

50.00

5

©.J¸ï.¸ÀÄgÉñï

28.88

15.45

5.67

50.00

6

qÁ||J¸ï.Dgï.°Ã¯Á

28.88

15.45

5.67

50.00

7

Dgï.«.ªÉAPÀmÉñï

28.88

15.45

5.67

50.00

8

«ªÀįÁUËqÀ

28.88

15.45

5.67

50.00

9

¥ÉÆæÃ:JA.Dgï.zÉÆgɸÁé«Ä

28.88

15.45

5.67

50.00

10

¥ÉÆæÃ:qÁ|| ªÀÄĪÀiÁÛeï D° SÁ£ï

28.88

15.45

5.67

50.00

11

zÀAiÀiÁ£ÀAzÀ

28.88

15.45

5.67

50.00

12

vÁgÁ C£ÀÆgÁzsÀ

28.88

15.45

5.67

50.00

13

PÉ.UÉÆÃ«AzÀgÁeï

28.88

15.45

5.67

50.00

14

«.¸ÉÆÃªÀÄtÚ

28.88

15.45

5.67

50.00

15

®ºÀgï ¹AUï ¹gÉÆÃAiÀiÁ

28.88

15.45

5.67

50.00

MlÄÖ

433.20

231.75

85.05

750.00

PÀ£ÁðlPÀ gÁdå¥ÀvÀæ, UÀÄgÀĪÁgÀ, K¦æ¯ï 17, 2014

¨sÁUÀ 1

670

(gÀÆ.®PÀëUÀ¼À°è)

PÀæªÀÄ

¸ÀASÉå

«zsÁ£À¥ÀjµÀvï ¸ÀzÀ¸ÀågÀ ºÉ¸ÀgÀÄUÀ¼ÀÄ

(²æÃ/²æÃªÀÄw)

¯ÉPÀÌ ²Ã¶ðPÉ 4575-60-800-0-01

MlÄÖ

132

422

423

(11) ¨ÉAUÀ¼ÀÆgÀÄ UÁæªÀiÁAvÀgÀ f¯Éè

1

¥ÀÄlÖtÚ

28.88

15.45

5.67

50.00

2

gÁªÀÄZÀAzÀæUËqÀ

28.88

15.45

5.67

50.00

3

E.PÀȵÀÚ¥Àà

28.88

15.45

5.67

50.00

MlÄÖ

86.64

46.35

17.01

150.00

(12) ªÉÄʸÀÆgÀÄ f¯Éè

1

¹zÀÝgÁdÄ

28.88

15.45

5.67

50.00

2

J¸ï.£ÁUÀgÁdÄ

28.88

15.45

5.67

50.00

3

PÉ.«.£ÁgÁAiÀÄt¸Áé«Ä

28.88

15.45

5.67

50.00

4

Dgï.zsÀªÀÄð¸ÉãÁ

28.88

15.45

5.67

50.00

5

¹.ºÉZï.«dAiÀıÀAPÀgÀ

28.88

15.45

5.67

50.00

6

UÉÆÃ.ªÀÄzsÀĸÀÆzÀ£ï

28.88

15.45

5.67

50.00

MlÄÖ

173.28

92.70

34.02

300.00

(13) ªÀÄAqÀå f¯Éè

1

ªÀÄjw¨ÉâÃUËqÀ

28.88

15.45

5.67

50.00

2

©.gÁªÀÄPÀȵÀÚ

28.88

15.45

5.67

50.00

3

C±Àévï£ÁgÁAiÀÄt

28.88

15.45

5.67

50.00

MlÄÖ

86.64

46.35

17.01

150.00

(14) PÉÆqÀUÀÄ f¯Éè

1

JA.¹.£ÁtAiÀÄå

28.88

15.45

5.67

50.00

2

n.e磕

28.88

15.45

5.67

50.00

MlÄÖ

57.76

30.90

11.34

100.00

(15) zÀQët PÀ£ÀßqÀ f¯Éè

1

r.«.¸ÀzÁ£ÀAzÀUËqÀ

28.88

15.45

5.67

50.00

2

PÉ.ªÉÆÃ£À¥Àà ¨sÀAqÁj

28.88

15.45

5.67

50.00

3

UÀuÉñï PÁtÂðPï

28.88

15.45

5.67

50.00

MlÄÖ

86.64

46.35

17.01

150.00

(16) GqÀĦ f¯Éè

1

PÉ.¥ÀævÁ¥ÀZÀAzÀæ ±ÉnÖ

28.88

15.45

5.67

50.00

2

PÉÆÃl ²æÃ¤ªÁ¸À ¥ÀÆeÁj

28.88

15.45

5.67

50.00

MlÄÖ

57.76

30.90

11.34

100.00

¨sÁUÀ 1

PÀ£ÁðlPÀ gÁdå¥ÀvÀæ, UÀÄgÀĪÁgÀ, K¦æ¯ï 17, 2014

671

(gÀÆ.®PÀëUÀ¼À°è)

PÀæªÀÄ

¸ÀASÉå

«zsÁ£À¥ÀjµÀvï ¸ÀzÀ¸ÀågÀ ºÉ¸ÀgÀÄUÀ¼ÀÄ

(²æÃ/²æÃªÀÄw)

¯ÉPÀÌ ²Ã¶ðPÉ 4575-60-800-0-01

MlÄÖ

132

422

423

(17) ²ªÀªÉÆUÀÎ f¯Éè

1

r.ºÉZï.±ÀAPÀgÀªÀÄÆwð

28.88

15.45

5.67

50.00

2

¨sÁgÀw ±ÉnÖ

28.88

15.45

5.67

50.00

3

Dgï.PÉ.¹zÀÞgÁªÀÄtÚ

28.88

15.45

5.67

50.00

4

¥ÉÆæ: ¦.«.PÀȵÀÚ¨sÀmï

28.88

15.45

5.67

50.00

5

¨sÁ£ÀÄ¥ÀæPÁ±ï

28.88

15.45

5.67

50.00

MlÄÖ

144.40

77.25

28.35

250.00

(18) zsÁgÀªÁqÀ f¯Éè

1

ªÀÄwÛPÀnÖ«ÃgÀtÚ

28.88

15.45

5.67

50.00

2

§¸ÀªÀgÁd ºÉÆgÀnÖ

28.88

15.45

5.67

50.00

3

bÀ©â £ÁUÀgÁeï

28.88

15.45

5.67

50.00

4

ªÀiÁ£É ²æÃ¤ªÁ¸À

28.88

15.45

5.67

50.00

MlÄÖ

115.52

61.80

22.68

200.00

(19) ºÁªÉÃj

1

¸ÉÆÃªÀÄtÚ ¸Áé«Ä°AUÀ ¨Éë£ÀªÀÄgÀzÀ

28.88

15.45

5.67

50.00

MlÄÖ

28.88

15.45

5.67

50.00

(20) ©eÁ¥ÀÄgÀ f¯Éè

1

CgÀÄt ±ÀºÁ¥ÀÄgÀ

28.88

15.45

5.67

50.00

MlÄÖ

28.88

15.45

5.67

50.00

(21) ¨ÁUÀ®PÉÆÃmÉ f¯Éè

1

J¸ï.Dgï.¥Ánïï

28.88

15.45

5.67

50.00

2

f.J¸ï.£ÁåªÀÄUËqÀ

28.88

15.45

5.67

50.00

3

£ÁgÁAiÀÄt ¸Á.¨ÁAqÀUÉ

28.88

15.45

5.67

50.00

MlÄÖ

86.64

46.35

17.01

150.00

(22) aPÀ̪ÀÄUÀ¼ÀÆgÀÄ f¯Éè

1

ªÉÆÃlªÀÄä

28.88

15.45

5.67

50.00

2

J.«.UÁ¬Äwæ ±ÁAvÉÃUËqÀ

28.88

15.45

5.67

50.00

3

JA. ²æÃ¤ªÁ¸ï

28.88

15.45

5.67

50.00

MlÄÖ

86.64

46.35

17.01

150.00

(23) GvÀÛgÀ PÀ£ÀßqÀ f¯Éè

1

WÉÆÃnßPÀgï ²æÃPÁAvÀ ®PÀëöät

28.88

15.45

5.67

50.00

MlÄÖ

28.88

15.45

5.67

50.00

(24) ¨É¼ÀUÁA f¯Éè

1

«ÃgÀPÀĪÀiÁgï C¥Áà¸ÉÆÃ ¥Ánïï

28.88

15.45

5.67

50.00

2

PÀªÀlV ªÀÄoÀ ªÀĺÀAvÉñï

28.88

15.45

5.67

50.00

3

ªÀĺÁAvÉÃ±ï ²ªÁ£ÀAzÀ PËd®V

28.88

15.45

5.67

50.00

MlÄÖ

86.64

46.35

17.01

150.00

PÀ£ÁðlPÀ gÁdå¥ÀvÀæ, UÀÄgÀĪÁgÀ, K¦æ¯ï 17, 2014

¨sÁUÀ 1

672

(gÀÆ.®PÀëUÀ¼À°è)

PÀæªÀÄ

¸ÀASÉå

«zsÁ£À¥ÀjµÀvï ¸ÀzÀ¸ÀågÀ ºÉ¸ÀgÀÄUÀ¼ÀÄ

(²æÃ/²æÃªÀÄw)

¯ÉPÀÌ ²Ã¶ðPÉ 4575-60-800-0-01

MlÄÖ

132

422

423

(25) ºÁ¸À£À f¯Éè

1

¥ÀmÉÃ¯ï ²ªÀgÁA

28.88

15.45

5.67

50.00

2

©.©.²ªÀ¥Àà

28.88

15.45

5.67

50.00

MlÄÖ

57.76

30.90

11.34

100.00

MlÄÖ ªÉÆvÀÛ

2108.24

1127.85

413.91

3650.00

PR. 327

J¸ï.GªÀiÁªÀw,

¸ÀPÁðgÀzÀ C¢üãÀ PÁAiÀÄðzÀ²ð-1 & 2,

AiÉÆÃd£É, PÁAiÀÄðPÀæªÀÄ ¸ÀAAiÉÆÃd£É ªÀÄvÀÄÛ ¸ÁATåPÀ E¯ÁSÉ.

²PÀët ¸ÀaªÁ®AiÀÄ

«µÀAiÀÄ

:

¸ÀPÁðj ¥ÁæxÀ«ÄPÀ ±Á¯ÉUÀ¼À°è ¸ÉÃªÉ ¸À°è¸ÀÄwÛgÀĪÀ DAiÀiÁUÀ¼À ªÀiÁ¹PÀ UËgÀªÀ zsÀ£ÀªÀ£ÀÄß

gÀÆ.3000/- ¢AzÀ gÀÆ.5000/- PÉÌ ºÉaѸÀĪÀ §UÉÎ ºÁUÀÆ gÁ¶ÖçÃAiÀÄ ¦AZÀt ªÀåªÀ¸ÉÜ –

J¯ïLn (N.P.S.-lite scheme) ¸Ë®¨sÀåªÀ£ÀÄß MzÀV¸ÀĪÀ §UÉÎ.

NzÀ¯ÁVzÉ :

1. ¸ÀPÁðj DzÉñÀ ¸ÀASÉå: Er 100 ¦©J¸ï 2009, ¢£ÁAPÀ: 09-09-2009.

2. DAiÀÄÄPÀÛgÀÄ ¸ÁªÀðd¤PÀ ²PÀët E¯ÁSÉ, ¨ÉAUÀ¼ÀÆgÀÄ gÀªÀgÀ ¥ÀvÀæ ¸ÀASÉå:

J.r.JA.2(2)/DAiÀiÁ./145/2006-07, ¢£ÁAPÀ: 08-07-2013.

¥Àæ¸ÁÛªÀ£É :

ªÉÄÃ¯É NzÀ¯ÁVgÀĪÀ (1)gÀ ¸ÀPÁðj DzÉñÀzÀ°è gÁdå ¸ÀPÁðj ¥ÁæxÀ«ÄPÀ ±Á¯ÉUÀ¼À°è PÁAiÀÄð¤ªÀð»¸ÀÄwÛgÀĪÀ DAiÀiÁUÀ¼À ªÀiÁ¹PÀ

ªÉÃvÀ£ÀªÀ£ÀÄß gÀÆ.1500/- jAzÀ 3000/- PÉÌ ºÉaѸÀ¯ÁVvÀÄÛ. ªÉÄÃ¯É NzÀ¯ÁVgÀĪÀ (2) gÀ ¥ÀvÀæzÀ°è DAiÀÄÄPÀÛgÀÄ, ¸ÁªÀðd¤PÀ ²PÀët E¯ÁSÉ,

¨ÉAUÀ¼ÀÆgÀÄ EªÀgÀÄ DAiÀiÁUÀ¼À ªÀiÁ¹PÀ ªÉÃvÀ£ÀªÀ£ÀÄß ºÉaѸÀĪÀ §UÉÎ ºÁUÀÆ DAiÀiÁUÀ¼ÀÄ ¤ªÀÈwÛ ºÉÆA¢zÀ £ÀAvÀgÀ ¤ªÀÈwÛ ªÉÃvÀ£À ¤ÃqÀĪÀ §UÉÎ

¸ÀPÁðgÀPÉÌ ¥Àæ¸ÁÛªÀ£É ¸À°è¹gÀÄvÁÛgÉ. ¸ÀzÀj ¥Àæ¸ÁÛªÀ£ÉAiÀÄ£ÀÄß ¸ÀPÁðgÀ PÀÆ®APÀµÀªÁV ¥Àj²Ã°¹ ¸ÀPÁðj ¥ÁæxÀ«ÄPÀ ±Á¯ÉUÀ¼À°è ¸ÉÃªÉ ¸À°è¸ÀÄwÛgÀĪÀ

DAiÀiÁUÀ¼À ªÀiÁ¹PÀ ªÉÃvÀ£ÀªÀ£ÀÄß ºÉaѸÀĪÀ §UÉÎ ºÁUÀÆ ¤ªÀÈwÛ £ÀAvÀgÀ ¤ªÀÈwÛ ªÉÃvÀ£À ¸Ë®¨sÀå ¤ÃqÀĪÀ §UÉÎ F PɼÀPÀAqÀAvÉ DzÉò¹zÉ.

¸ÀPÁðgÀzÀ DzÉñÀ ¸ÀASÉå: Er 136 ¦©J¸ï 2012, ¨ÉAUÀ¼ÀÆgÀÄ ¢£ÁAPÀ: 26-12-2013.

2.

gÁdå ¸ÀPÁðj »jAiÀÄ ¥ÁæxÀ«ÄPÀ ±Á¯ÉUÀ¼À°è ¸ÉÃªÉ ¸À°è¸ÀÄwÛgÀĪÀ DAiÀiÁUÀ¼À ªÀiÁ¹PÀ UËgÀªÀzsÀ£ÀªÀ£ÀÄß (Honararium) gÀÆ.3000/-

¢AzÀ gÀÆ.5000/- (LzÀÄ ¸Á«gÀ gÀÆ¥Á¬ÄUÀ¼ÀÄ ªÀiÁvÀæ) UÀ½UÉ ºÉaѹ ¸ÀPÁðgÀzÀ ªÀÄAdÆgÁw ¤ÃqÀ¯ÁVzÉ. F UËgÀªÀzsÀ£ÀªÀÅ ®ªÀiï¸ÀªÀiï

(Lumpsum) UËgÀªÀzsÀ£ÀªÁVgÀÄvÀÛzÉ. r.J. CxÀªÁ PÀ¤µÀ× ªÉÃvÀ£ÀPÉÌ ¸ÀA§AzsÀ¥ÀnÖgÀĪÀÅ¢®è. F ºÉZÀÄѪÀj ªÉZÀѪÀ£ÀÄß E¯ÁSÉAiÀÄÄ f¯Áè

ªÀ®AiÀÄzÀrAiÀÄ DAiÀĪÀåAiÀÄ CªÀPÁ±À¢AzÀ¯Éà ¯ÉPÀÌ ²Ã¶ðPÉ 2202-01-101-0-71 (AiÉÆÃd£ÉÃvÀgÀ) Cr ¤UÀ¢AiÀiÁVgÀĪÀ f¯Áè DAiÀĪÀåAiÀÄzÀ

«ÄwAiÉÆ¼ÀUÉà ¨sÀj¸ÀvÀPÀÌzÀÄÝ. F ¸ÀA§AzsÀ ºÉZÀÄѪÀj C£ÀÄzÁ£À ¤ÃqÀ¯ÁUÀĪÀÅ¢®è ºÁUÀÆ PÀAzÁAiÀÄ E¯ÁSÉAiÀÄ UÁæªÀĸÀºÁAiÀÄPÀjUÉ

C£Àé¬Ä¸ÀĪÀAvÉ gÁ¶ÖçÃAiÀÄ ¦AZÀt ªÀåªÀ¸ÉÜ-J¯ïLn (N.P.S.-lite scheme) ¸Ë®¨sÀåªÀ£ÀÄß eÁjUÉÆ½¸À®Ä ¸ÀºÀ ªÀÄAdÆgÁw ¤ÃrzÉ. C®èzÉÃ

ªÀiÁ¹PÀ ¸ÀA¨sÁªÀ£ÉAiÀÄ£ÀÄß ¸ÀÆPÀÛªÁV ºÉaѸÀ®Ä ¸ÀºÀ ¸ÀºÀªÀÄw ¤ÃrzÉ.

3.

F DzÉñÀªÀ£ÀÄß DyðPÀ E¯ÁSÉAiÀÄ n¥Ààt ¸ÀASÉå: DE 616 ªÉZÀÑ-8/2013, ¢£ÁAPÀ:11-10-2013gÀ°è ¤ÃrgÀĪÀ ¸ÀºÀªÀÄwAiÉÆA¢UÉ

ºÉÆgÀr¸À¯ÁVzÉ.

PR. 328

SC-150

PÀ£ÁðlPÀ gÁdå¥Á®gÀ DzÉñÁ£ÀĸÁgÀ ªÀÄvÀÄÛ CªÀgÀ ºÉ¸Àj£À°è

J¸ï.©.¥ÀlUÁgÀ,

¸ÀPÁðgÀzÀ C¢üãÀ PÁAiÀÄðzÀ²ð,

²PÀët E¯ÁSÉ (¥ÁæxÀ«ÄPÀ).

ªÀÄÄzÀæPÀgÀÄ ºÁUÀÆ ¥ÀæPÁ±ÀPÀgÀÄ:- ¸ÀAPÀ®£Á¢üPÁjUÀ¼ÀÄ, PÀ£ÁðlPÀ gÁdå¥ÀvÀæ, ¸ÀPÁðj PÉÃAzÀæ ªÀÄÄzÀæuÁ®AiÀÄ, ¨ÉAUÀ¼ÀÆgÀÄ-59

R.N.I. No. KARBIL/2001/47147 POSTAL REGN. No. RNP/KA/BGS/2202/2014-16

Licensed to post without prepayment WPP No. 297