(641)
¨sÁUÀ 1
gÁdå ¸ÀPÁðgÀzÀ ªÀÄÄRå DzÉñÀUÀ¼ÀÄ ºÁUÀÆ ¸ÀÄvÉÆÛÃ¯É ªÀÄÄAvÁzÀ
J¯Áè E¯ÁSÉUÀ½UÀÆ ¸ÀA§A¢ü¹zÀ DzÉñÀUÀ¼ÀÄ
COMMERCE AND INDUSTRIES SECRETARIAT
Sub
:
Proposal of M/s. Leadage Metals Ltd., - to establish ``Smelting & Refining of
Lead Unit'' at Vemgal Industrial Area, Kolar District – Reg.
Ref
:
Proceedings of the 33rd State High Level Clearance Committee (SHLCC)
meeting held on 19.11.2013.
PREAMBLE:
M/s. Leadage Metals Ltd., has proposed to establish ``Smelting & Refining of Lead Unit'', with an investment of Rs. 80.52
crore, generating employment to about 205 persons at Vemgal Industrial Area, Kolar District.
The proposal was examined in the 33rd State High Level Clearance Committee (SHLCC) Meeting held on
19.11.2013.Government has examined the recommendations made by the State High Level Clearance Committee, in all aspects.
Hence the following order.
GOVERNMENT ORDER No. CI 9 SPI 2014, BANGALORE, DATED: 03.01.2014
Government is pleased to accord in principle approval to the investment proposal of M/s. Leadage Metals Ltd., to establish
``Smelting & Refining of Lead Unit'', with an investment of Rs. 80.52 crore at Vemgal Industrial Area, Kolar District, generating
employment to about 205 persons with the following infrastructure facilities, incentives and concessions:
Land :
KIADB to allot 12 acres of land at Vemagal Industrial Area, Kolar District
Power:
4187 KVA from BESCOM.
Water:
85000 LPD form KIADB/Rain water harvesting/Own source/Recycled water
Incentives &
Concessions:
The unit is eligible to avail incentives and concessions as per the applicable
Industrial Policy of the state.
Sanction of the above infrastructure facilities, incentives and concessions is subject to the following terms and conditions:
1. Environment : The company to obtain Consent for Establishment and Consent for Operation from KSPCB and
environmental clearance from MoEF, Govt. of India or the Dept of Forest, Ecology & Environment, Govt. of Karnataka, if
applicable.
2. Employment : The Company shall comply with the provisions of Industrial Policy of Govt. of Karnataka and Dr. Sarojini
Mahishi Report,. Prepare a plan for development of Human Resources required for the project, train local people. A copy
of Human Resources Development plan shall be sent to the Commissioner for Industrial Development & Director of
Industries and Commerce for monitoring.
¸ÀA¥ÀÄl 149
Volume 149
¨ÉAUÀ¼ÀÆgÀÄ, UÀÄgÀĪÁgÀ, K¦æ¯ï 17, 2014 (ZÉÊvÀæ 27, ±ÀPÀ ªÀµÀð 1936)
Bangalore, Thursday, April 17, 2014 (Chaithra 27, Shaka Varsha 1936)
¸ÀAaPÉ 16
Issue 16
PÀ£ÁðlPÀ gÁdå¥ÀvÀæ, UÀÄgÀĪÁgÀ, K¦æ¯ï 17, 2014
¨sÁUÀ 1
642
3. Vendor Development : Wherever there is scope for vendor development for the project, the company shall prepare a
vendor development plan, develop local vendors and procure the required inputs, components and sub-assemblies from
these local vendor units. A copy of the vendor development plan shall be sent to the Commissioner for Industrial
Development & Director of Industries and Commerce for monitoring.
4. Social Infrastructure Development : The Company is advised to take up social infrastructure development projects in
the vicinity of the proposed location of the unit and comply with the stipulation of Company Act 2013. A copy of such
projects shall be sent to the Commissioner for Industrial Development & Director of Industries and Commerce for
monitoring.
5. Others :
a)
The company shall adopt rainwater harvesting, waste water recycling and water conservation techniques. Zero
discharge facility should be adopted wherever applicable.
b)
The company shall take all statutory and other necessary clearances from the competent authorities including Govt.
of India and shall submit milestones/progress in the implementation of the project regularly, which will be monitored
by the Department.
This approval is valid for a period of two years from the date of issue of this Government Order.
PR 257
By Order and in the name of the Governor of Karnataka,
S. UMADEVI,
Desk Officer (Technical Cell),
Commerce and Industries Department.
COMMERCE AND INDUSTRIES SECRETARIAT
Sub
:
Proposal of M/s. TMEIC Industrial Systems India Pvt. Ltd., - to establish
``Rotating Motors and Power Electrical equipments Manufacturing Unit'' at
Vasantha Narasapur Industrial Area, Tumkur Taluk, Tumkur District- Reg.
Ref
:
Proceedings of the 33rd State High Level Clearance Committee (SHLCC)
meeting held on 19.11.2013.
PREAMBLE:
M/s. TMEIC Industrial Systems India Pvt. Ltd., - has proposed to establish a ``Rotating Motors and Power Electrical
equipments Manufacturing Unit'' with an investment of Rs. 250.00 crore, generating employment to about 548 persons at Vasantha
Narasapur Industrial Area, Tumkur Taluk, Tumkur District
The proposal was examined in the 33rd State High Level Clearance Committee (SHLCC) Meeting held on
19.11.2013.Government has examined the recommendations made by the State High Level Clearance Committee, in all aspects.
Hence the following order.
GOVERNMENT ORDER No. CI 10 SPI 2014, BANGALORE, DATED: 03.01.2014
Government is pleased to accord in principle approval to the investment proposal of M/s. TMEIC Industrial Systems India Pvt.
Ltd., to establish a ``Rotating Motors and Power Electrical Equipments Manufacturing Unit'' with an investment of Rs. 250.00 crore, at
Vasantha Narasapur Industrial Area, Tumkur Taluk, Tumkur District generating employment to about 548 persons with the following
infrastructure facilities, incentives and concessions:
Land :
KIADB to allot 15 acres of land at Vasantha Narasapur Industrial Area, Tumkur
District
Power:
4000 KVA from BESCOM.
Water:
60 KLPD form KIADB
Incentives &
Concessions:
The unit is eligible to avail incentives and concessions as per the applicable
Industrial Policy of the state.
Sanction of the above infrastructure facilities, incentives and concessions is subject to the following terms and conditions:
1. Environment : The company to obtain Consent for Establishment and Consent for Operation from KSPCB and
environmental clearance from MoEF, Govt. of India or the Dept of Forest, Ecology & Environment, Govt. of Karnataka, if
applicable.
2. Employment : The Company shall comply with the provisions of Industrial Policy of Govt. of Karnataka and Dr. Sarojini
Mahishi Report,. Prepare a plan for development of Human Resources required for the project, train local people. A copy
¨sÁUÀ 1
PÀ£ÁðlPÀ gÁdå¥ÀvÀæ, UÀÄgÀĪÁgÀ, K¦æ¯ï 17, 2014
643
of Human Resources Development plan shall be sent to the Commissioner for Industrial Development & Director of
Industries and Commerce for monitoring.
3. Vendor Development : Wherever there is scope for vendor development for the project, the company shall prepare a
vendor development plan, develop local vendors and procure the required inputs, components and sub-assemblies from
these local vendor units. A copy of the vendor development plan shall be sent to the Commissioner for Industrial
Development & Director of Industries and Commerce for monitoring.
4. Social Infrastructure Development : The Company is advised to take up social infrastructure development projects in
the vicinity of the proposed location of the units. A copy of such projects shall be sent to the Commissioner for Industrial
Development & Director of Industries and Commerce for monitoring.
5. Others :
a)
The company shall adopt rainwater harvesting, waste water recycling and water conservation techniques. Zero
discharge facility should be adopted wherever applicable.
b)
The company shall take all statutory and other necessary clearances from the competent authorities including Govt.
of India and shall submit milestones/progress in the implementation of the project regularly, which will be monitored
by the Department.
This approval is valid for a period of two years from the date of issue of this Government Order.
PR 258
By Order and in the name of the Governor of Karnataka,
S. UMADEVI,
Desk Officer (Technical Cell),
Commerce and Industries Department.
COMMERCE AND INDUSTRIES SECRETARIAT
Sub
:
Proposal of M/s. Volvo India Pvt. Ltd., - to establish ``Commercial Vehicles
Manufacturing Unit'' at Sonnenyakanahalli, Malur Taluk, Kolar District- Reg.
Ref
:
Proceedings of the 33rd State High Level Clearance Committee (SHLCC)
meeting held on 19.11.2013.
PREAMBLE:
M/s.Volvo India Pvt. Ltd., has proposed to establish a ``Commercial Vehicles (Truckas & Buses) Manufacturing Unit'' with an
investment of Rs. 974.00 crore, generating employment to about 2125 persons at Sonnenyakanahalli, Malur Taluk, Kolar District.
The proposal was examined in the 33rd State High Level Clearance Committee (SHLCC) Meeting held on
19.11.2013.Government has examined the recommendations made by the State High Level Clearance Committee, in all aspects.
Hence the following order.
GOVERNMENT ORDER No. CI 11 SPI 2014, BANGALORE, DATED: 03.01.2014
Government is pleased to accord in principle approval to the investment proposal of M/s Volvo India Pvt. Ltd., to establish a
``Commercial Vehicles (Trucks & Buses) Manufacturing Unit'', with an investment of Rs. 974.00 crore at Sonnenyakanahalli, Malur
Taluk, Kolar District, generating employment to about 2125 persons with the following infrastructure facilities, incentives and
concessions:
Land :
90 acres of land in the following Sy. Nos. to be acquired and allotted through
KIADB as SUC (80% consent) or to be purchased U/s 109 of KLR Act and
conversion of the same, subject to the approval of Hosakote Planning Authority
wherever applicable.
Sonnenayakanahalli, Malur Taluk - 69 acres in various Sy.Nos. 33/P 1, 33/P2,
33/P3, 33/P4, 33/P5, 33/P6, 33/P7, 33/P8, 33/P9, 33/P10, 33/P11, 33/P12,
33/P13, 33/P14,33/P15, 33/P16, 33/P17, 33/P18, 33/P19, 57, 58, 59, 62, 63,
64, 65, 66 and
Manchappanahalli, Hoskote Taluk - 21 acres in various Sy.Nos. 114/Pl,
114/P2, 114/P2/P1, 114/P3, 114/P4, 114/P5, 114/P6, 114/P7, 114/P8, 114/P9,
114/P10, 114/P11, 114/P12, 114/P13, 114/P14, 114/P15, 114/P16.
Power:
1200 KVA from BESCOM.
Water:
12 Lakhs LPD from own source
Incentives &
Concessions:
The unit is eligible to avail incentives and concessions as per the applicable
Industrial Policy of the state.
PÀ£ÁðlPÀ gÁdå¥ÀvÀæ, UÀÄgÀĪÁgÀ, K¦æ¯ï 17, 2014
¨sÁUÀ 1
644
Sanction of the above infrastructure facilities, incentives and concessions is subject to the following terms and conditions:
1. Environment : The company to obtain Consent for Establishment and Consent for Operation from KSPCB and
environmental clearance from MoEF, Govt. of India or the Dept of Forest, Ecology & Environment, Govt. of Karnataka, if
applicable.
2. Employment : The Company shall comply with the provisions of Industrial Policy of Govt. of Karnataka and Dr. Sarojini
Mahishi Report,. Prepare a plan for development of Human Resources required for the project, train local people. A copy
of Human Resources Development plan shall be sent to the Commissioner for Industrial Development & Director of
Industries and Commerce for monitoring.
3. Vendor Development : Wherever there is scope for vendor development for the project, the company shall prepare a
vendor development plan, develop local vendors and procure the required inputs, components and sub-assemblies from
these local vendor units. A copy of the vendor development plan shall be sent to the Commissioner for Industrial
Development & Director of Industries and Commerce for monitoring.
4. Social Infrastructure Development : The Company is advised to take up social infrastructure development projects in
the vicinity of the proposed location of the unit and comply with the stipulation of Company Act 2013. A copy of such
projects shall be sent to the Commissioner for Industrial Development & Director of Industries and Commerce for
monitoring.
5. Others :
a)
The company shall adopt rainwater harvesting, waste water recycling and water conservation techniques. Zero
discharge facility should be adopted wherever applicable.
b)
The company shall take all statutory and other necessary clearances from the competent authorities including Govt.
of India and shall submit milestones/progress in the implementation of the project regularly, which will be monitored
by the Department.
This approval is valid for a period of two years from the date of issue of this Government Order.
PR 259
By Order and in the name of the Governor of Karnataka,
S. UMADEVI,
Desk Officer (Technical Cell),
Commerce and Industries Department.
DgÉÆÃUÀå ªÀÄvÀÄÛ PÀÄlÄA§ PÀ¯Áåt ¸ÀaªÁ®AiÀÄ
«µÀAiÀÄ: ¸ÀPÁðj DAiÀÄĪÉÃðzÀ ªÉÊzÀåQÃAiÀÄ ªÀĺÁ«zÁå®AiÀÄ, ªÉÄʸÀÆgÀÄ E°è£À G¥À£Áå¸ÀPÀgÀÄUÀ¼À
¥Àj«ÃPÀëuÁ CªÀ¢üAiÀÄ£ÀÄß WÉÆÃ¶¸ÀĪÀ §UÉÎ.
NzÀ¯ÁVzÉ:
1.
DAiÀÄÄµï ¤zÉÃð±ÀPÀgÀ ¥ÀvÀæ ¸ÀASÉå/63/¹§âA¢ (1)/2013-14, ¢£ÁAPÀ 24-01-2014.
2.
C¢ü¸ÀÆZÀ£É ¸ÀASÉå : DPÀÄPÀ 110 ¦nr 2009, ¢£ÁAPÀ 22-07-2011.
¥Àç¸ÁÛªÀ£É:
ªÉÄÃ¯É NzÀ¯ÁzÀ ¥ÀvÀæzÀ°è, ¤zÉÃð±ÀPÀgÀÄ, DAiÀÄĵï E¯ÁSÉ EªÀgÀÄ DAiÀÄĵï£À ««zsÀ ¸ÀPÁðj ªÉÊzÀåQÃAiÀÄ ªÀĺÁ«zÁå®AiÀÄUÀ¼À°è
UÀÄwÛUÉ DzsÁgÀzÀ ªÉÄÃ¯É PÀvÀðªÀå ¤ªÀð»¸ÀÄwÛzÀÝ 56 d£À G¥À£Áå¸ÀPÀgÀÄUÀ¼À ¸ÉêÉAiÀÄ£ÀÄß ¸ÀPÁðgÀzÀ C¢ü¸ÀÆZÀ£É ¸ÀASÉå : DPÀÄPÀ 110 ¦nr
2009, ¢£ÁAPÀ 22-07-2011 gÀ£ÀéAiÀÄ ¸ÀPÀæªÀÄUÉÆ½¸À¯ÁVzÀÄÝ, EzÀgÀ°è ªÉÄʸÀÆj£À ¸ÀPÁðj DAiÀÄĪÉÃðzÀ ªÉÊzÀåQÃAiÀÄ ªÀĺÁ«zÁå®AiÀÄzÀ°è
PÀvÀðªÀå ¤ªÀð»¸ÀÄwÛgÀĪÀ 13 d£À G¥À£Áå¸ÀPÀgÀÄUÀ¼ÁzÀ qÁ|| ¸ÀĪÀÄ£ï, qÁ|| ªÀĪÀÄvÁ²æÃ J¸ï, qÁ|| «dAiÀÄ®Qëöä eÉ.ºÉZï, qÁ|| DzÀ±Àð
J¸ï.f., qÁ|| ¸ÀAdAiÀÄ PÀĪÀiÁgï JA.r., qÁ|| ªÁ¸ÀÄzÉêÀ D£ÀAzÀgÁªï ZÁmÉ, qÁ|| gÁdÄ f. PÀÄgÀtÂ, qÁ|| £À½¤ J£ï., qÁ|| £ÁUÉñï
ºÉZï.r., qÁ|| CgÀ«Azï AiÀiÁzÀªï. J¸ï., qÁ|| ªÀÄĸÀÛPï CºÀªÀÄzï £ÉUÀ¼ÀÆgÀÄ, qÁ|| D£ÀAzÀ PÀnÖ ªÀÄvÀÄÛ qÁ|| C£ÀÄgÀÆ¥À ºÉZï.PÉ. EªÀgÀÄUÀ¼ÀÄ
¢£ÁAPÀ 26-07-2011 gÀAzÀÄ CªÀgÀÄUÀ¼ÀÄ DAiÉÄÌAiÀiÁVgÀĪÀ G¥À£Áå¸ÀPÀgÀ ºÀÄzÉÝAiÀÄ ¸ÉêÉUÉ ºÁdgÁVzÀÄÝ, CªÀgÀ ¥ÀjÃPÁëxÀð CªÀ¢üAiÀÄÄ
¢£ÁAPÀ 25.07.2013 gÀAzÀÄ C¥ÀgÁºÀß ªÀÄÄPÁÛAiÀĪÁVgÀÄvÀÛzÉAzÀÄ, F J¯Áè G¥À£Áå¸ÀPÀgÀÄUÀ¼ÀÄ ºÀÄzÉÝUÉ ¤UÀ¢¥Àr¹gÀĪÀ E¯ÁSÁ ¥ÀjÃPÉëUÀ¼À£ÀÄß
¥Á¸ÀÄ ªÀiÁrzÀÄÝ, EªÀgÀÄUÀ¼À JgÀqÀÄ ªÀµÀðUÀ¼À PÁAiÀÄð¤ªÀðºÀuÁ ªÀgÀ¢UÀ¼À°è AiÀiÁªÀÅzÉà ¥ÀæwPÀÆ® µÀgÁUÀ¼ÀÄ E®èªÉAzÀÄ ºÁUÀÆ AiÀiÁªÀÅzÉÃ
E¯ÁSÁ «ZÁgÀuÉ EgÀĪÀÅ¢®èªÉA§ÄzÀ£ÀÄß zÀÈrüÃPÀj¸ÀÄvÁÛ, ¸ÀzÀj G¥À£Áå¸ÀPÀgÀÄUÀ¼À SÁAiÀÄA¥ÀƪÀð CªÀ¢üAiÀÄ£ÀÄß vÀȦÛPÀgÀªÉAzÀÄ WÉÆÃ¶¸ÀĪÀ
§UÉÎ ¸ÀPÁðgÀzÀ ºÀAvÀzÀ°è ¤tðAiÀÄ vÉUÉzÀÄPÉÆ¼ÀÄîªÀAvÉ PÉÆÃj ¥Àæ¸ÁÛªÀ£ÉAiÀÄ£ÀÄß ¸À°è¹gÀÄvÁÛgÉ.
ªÉÄÃ¯É PÀæªÀĸÀASÉå (2) gÀ°è NzÀ¯ÁzÀ C¢ü¸ÀÆZÀ£ÉAiÀİè DAiÀÄĵï£À ««zsÀ ¸ÀPÁðj ªÉÊzÀåQÃAiÀÄ ªÀĺÁ«zÁå®AiÀÄUÀ¼À°è UÀÄwÛUÉ
DzsÁgÀzÀ ªÉÄÃ¯É PÁAiÀÄ𠤪Àð»¸ÀÄwÛzÀÝ 56 d£À G¥À£Áå¸ÀPÀgÀÄUÀ¼À ¸ÉêÉAiÀÄ£ÀÄß ¸ÀPÁðj ¸ÉêÉAiÀÄ°è «°Ã£ÀUÉÆ½¸À¯ÁVgÀÄvÀÛzÉ.
¨sÁUÀ 1
PÀ£ÁðlPÀ gÁdå¥ÀvÀæ, UÀÄgÀĪÁgÀ, K¦æ¯ï 17, 2014
645
¥Àæ¸ÁÛªÀ£ÉAiÀÄ£ÀÄß PÀÆ®APÀµÀªÁV ¥Àj²Ã°¹gÀĪÀ ¸ÀPÁðgÀªÀÅ, UÀÄwÛUÉ DzsÁgÀzÀ £ÉêÀÄPÁw¬ÄAzÀ ¸ÉêÁ ¸ÀPÀæªÀÄUÉÆAqÀÄ ªÉÄʸÀÆj£À
¸ÀPÁðj DAiÀÄĪÉÃðzÀ ªÉÊzÀåQÃAiÀÄ ªÀĺÁ«zÁå®AiÀÄzÀ°è PÀvÀðªÀå ¤ªÀð»¸ÀÄwÛgÀĪÀ F PɼÀPÀAqÀ 13 d£À G¥À£Áå¸ÀPÀgÀÄUÀ¼ÀÄ CªÀgÀÄUÀ¼À
¥Àj«ÃPÀëuÁ CªÀ¢üAiÀÄ£ÀÄß vÀȦÛPÀgÀªÁV ¥ÀÆgÉʹgÀÄvÁÛgÉAzÀÄ WÉÆÃ¶¸À®Ä ¤zsÀðj¹zÉ. DzÀÄzÀjAzÀ F PɼÀPÀAqÀ DzÉñÀ.
¸ÀPÁðgÀzÀ DzÉñÀ ¸ÀASÉå: DPÀÄPÀ 62 ¦nr 2014, ¨ÉAUÀ¼ÀÆgÀÄ, ¢£ÁAPÀ: 22-02-2014
¥Àæ¸ÁÛªÀ£ÉAiÀÄ°è «ªÀj¹gÀĪÀ CA±ÀUÀ¼À »£É߯ÉAiÀİè, PÀ£ÁðlPÀ ¸ÀPÁðj ¸ÉêÁ (¥Àj«ÃPÀëuÉ) ¤AiÀĪÀÄUÀ¼ÀÄ, 1977gÀ ¤AiÀĪÀÄ 5(1)(J)
gÀ£ÀéAiÀÄ ªÉÄʸÀÆj£À ¸ÀPÁðj DAiÀÄĪÉÃðzÀ ªÉÊzÀåQÃAiÀÄ ªÀĺÁ«zÁå®AiÀÄzÀ°è PÀvÀðªÀå ¤ªÀð»¸ÀÄwÛgÀĪÀ F PɼÀPÀAqÀ 13 d£À G¥À£Áå¸ÀPÀgÀÄUÀ¼ÀÄ
CªÀgÀÄUÀ¼À ºÉ¸ÀgÀÄUÀ¼À ªÀÄÄAzÉ £ÀªÀÄÆ¢¹zÀ ¢£ÁAPÀzÀAzÀÄ ¥Àj«ÃPÀëuÁ CªÀ¢üAiÀÄ£ÀÄß vÀȦÛPÀgÀªÁV ¥ÀÆgÉʹgÀÄvÁÛgÉAzÀÄ WÉÆÃ¶¸À¯ÁVzÉ.
PÀæªÀÄ
¸ÀASÉå
G¥À£Áå¸ÀPÀgÀ ºÉ¸ÀgÀÄ
£ÉêÀÄPÁwAiÀiÁzÀ DzÉñÀ
¸ÀASÉå ªÀÄvÀÄÛ ¢£ÁAPÀ
¸ÉêÉUÉ ºÁdgÁzÀ
¢£ÁAPÀ
¥Àj«ÃPÀëuÁ CªÀ¢üAiÀÄ£ÀÄß
vÀȦÛPÀgÀªÁV ¥ÀÆgÉʹzÀ
¢£ÁAPÀ
1
2
3
4
5
1
qÁ|| ¸ÀĪÀÄ£ï
DPÀÄPÀ 110 ¦nr 2009,
¢£ÁAPÀ 22-07-2011
26-07-2011
25-07-2013
C¥ÀgÁºÀß
2
qÁ|| ªÀĪÀÄvÁ²æÃ J¸ï
DPÀÄPÀ 110 ¦nr 2009,
¢£ÁAPÀ 22-07-2011
26-07-2011
25-07-2013
C¥ÀgÁºÀß
3
qÁ|| «dAiÀÄ®Qëöä f.ºÉZï.
DPÀÄPÀ 110 ¦nr 2009,
¢£ÁAPÀ 22-07-2011
26-07-2011
25-07-2013
C¥ÀgÁºÀß
4
qÁ|| DzÀ±Àð J¸ï.f.
DPÀÄPÀ 110 ¦nr 2009,
¢£ÁAPÀ 22-07-2011
26-07-2011
25-07-2013
C¥ÀgÁºÀß
5
qÁ|| ¸ÀAdAiÀÄ PÀĪÀiÁgï JA.r.
DPÀÄPÀ 110 ¦nr 2009,
¢£ÁAPÀ 22-07-2011
26-07-2011
25-07-2013
C¥ÀgÁºÀß
6
qÁ|| ªÁ¸ÀÄzÉêÀ D£ÀAzÀgÁªï ZÁmÉ
DPÀÄPÀ 110 ¦nr 2009,
¢£ÁAPÀ 22-07-2011
26-07-2011
25-07-2013
C¥ÀgÁºÀß
7
qÁ|| gÁdÄ f. PÀÄgÀtÂ
DPÀÄPÀ 110 ¦nr 2009,
¢£ÁAPÀ 22-07-2011
26-07-2011
25-07-2013
C¥ÀgÁºÀß
8
qÁ|| £À½¤ J£ï.
DPÀÄPÀ 110 ¦nr 2009,
¢£ÁAPÀ 22-07-2011
26-07-2011
25-07-2013
C¥ÀgÁºÀß
9
qÁ|| £ÁUÉÃ±ï ºÉZï.r.
DPÀÄPÀ 110 ¦nr 2009,
¢£ÁAPÀ 22-07-2011
26-07-2011
25-07-2013
C¥ÀgÁºÀß
10
qÁ|| CgÀ«AzÀ AiÀiÁzÀªï. J¸ï.
DPÀÄPÀ 110 ¦nr 2009,
¢£ÁAPÀ 22-07-2011
26-07-2011
25-07-2013
C¥ÀgÁºÀß
11
qÁ|| ªÀÄĸÀÛPï CºÀªÀÄzï £ÉUÀ¼ÀÆgÀÄ
DPÀÄPÀ 110 ¦nr 2009,
¢£ÁAPÀ 22-07-2011
26-07-2011
25-07-2013
C¥ÀgÁºÀß
12
qÁ|| D£ÀAzÀ PÀnÖ
DPÀÄPÀ 110 ¦nr 2009,
¢£ÁAPÀ 22-07-2011
26-07-2011
25-07-2013
C¥ÀgÁºÀß
13
qÁ|| C£ÀÄgÀÆ¥À ºÉZï.PÉ.
DPÀÄPÀ 110 ¦nr 2009,
¢£ÁAPÀ 22-07-2011
26-07-2011
25-07-2013
C¥ÀgÁºÀß
µÀgÀvÀÄÛ : F DzÉñÀªÀÅ PÉ.J.n. Cfð ¸ÀASÉå : 5161-5260/2012 ºÁUÀÆ PÉ.J.n. Cfð ¸ÀASÉå 4353-06/2013 WÀ£À PÀ£ÁðlPÀ DqÀ½vÀ
£ÁåAiÀĪÀÄAqÀ½AiÀÄÄ ¤ÃqÀĪÀ CAwªÀÄ wæðUÉ M¼À¥ÀnÖgÀÄvÀÛzÉ.
PR. 268
PÀ£ÁðlPÀ gÁdå¥Á®gÀ DeÁÕ£ÀĸÁgÀ ªÀÄvÀÄÛ CªÀgÀ ºÉ¸Àj£À°è,
n.J£ï. £ÀgÀ¹AºÀgÁdÄ,
¸ÀPÁðgÀzÀ C¢üãÀ PÁAiÀÄðzÀ²ð (¥Àæ),
DgÉÆÃUÀå ªÀÄvÀÄÛ PÀÄlÄA§ PÀ¯Áåt E¯ÁSÉ.
(¨sÁ.ªÉÊ. ¥ÀzÀÞw ªÀÄvÀÄÛ ¸ÀªÀÄ£ÀéAiÀÄ)
PÀ£ÁðlPÀ gÁdå¥ÀvÀæ, UÀÄgÀĪÁgÀ, K¦æ¯ï 17, 2014
¨sÁUÀ 1
646
vÉÆÃlUÁjPÉ ¸ÀaªÁ®AiÀÄ
«µÀAiÀÄ: ``vÉAUÀÄ GvÀà£Àß GzÁå£ÀUÀ¼ÀÄ'' JA§ ºÉƸÀ AiÉÆÃd£ÉAiÀÄr 2013-14£Éà ¸Á°£À°è vÀĪÀÄPÀÆgÀÄ
f¯ÉèAiÀÄ ²gÁzÀ°è vÉAUÀÄ ¥ÁPïð ºÁUÀÆ GzÁå£ÀªÀ£À ¸Áܦ¸À®Ä DqÀ½vÁvÀäPÀ ªÀÄAdÆgÁw
ºÁUÀÆ Grant-in-Aid ªÀÄÆ®PÀ C£ÀÄzÁ£ÀªÀ£ÀÄß ¥ÀqÉAiÀÄ®Ä C£ÀĪÀÄw ¤ÃqÀĪÀ §UÉÎ.
NzÀ¯ÁVzÉ:
1.
¸ÀPÁðgÀzÀ DzÉñÀ ¸ÀASÉå : vÉÆÃE 87 vÉÆAiÉÆÃPÁ 2013, ¢£ÁAPÀ 31-08-2013
2.
¸ÀPÁðgÀzÀ DzÉñÀ ¸ÀASÉå : vÉÆÃE 87 vÉÆAiÉÆÃPÁ 2013, ¢£ÁAPÀ 21-09-2013
3.
vÉÆÃlUÁjPÉ ¤zÉÃð±À£Á®AiÀÄzÀ ¥ÀvÀæ ¸ÀASÉå : vÉÆÃE/vÉÆÃdA¤/vÉÆÃ¨É/«¤1/60/
2013-14/2482, ¢£ÁAPÀ 15-03-2014.
¥Àç¸ÁÛªÀ£É:
ªÉÄÃ¯É NzÀ¯ÁzÀ (1) gÀ°è 2013-14£Éà ¸Á°£À°è vÉÆÃlUÁjPÉ E¯ÁSÉAiÀÄ ªÀw¬ÄAzÀ ``vÉAUÀÄ GvÀà£Àß GzÁå£ÀUÀ¼ÀÄ'' JA§ ºÉƸÀ
AiÉÆÃd£ÉAiÀÄ£ÀÄß C£ÀĵÁ×£ÀUÉÆ½¸À®Ä ¯ÉPÀÌ ²Ã¶ðPÉ 2401-00-108-2-54 gÀr 100.00 ®PÀëUÀ¼À£ÀÄß «¤AiÉÆÃV¸À®Ä vÉÆÃlUÁjPÉ E¯ÁSÉAiÀÄ
¤zÉÃð±ÀPÀjUÉ C£ÀĪÀÄw ¤ÃqÀ¯ÁVzÉ.
ªÉÄÃ¯É NzÀ¯ÁzÀ (2) gÀ°è F GzÉÝñÀPÁÌV ªÉÆzÀ¯ÉgÀqÀÄ vÉæöʪÀiÁ¹PÀ C£ÀÄzÁ£À gÀÆ. 50.00 ®PÀëUÀ¼À£ÀÄß ©qÀÄUÀqÉ ªÀiÁqÀ¯ÁVzÉ.
ªÉÄÃ¯É NzÀ¯ÁzÀ (3) gÀ vÉÆÃlUÁjPÉ ¤zÉÃð±ÀPÀgÀ ¥ÀvÀæzÀ°è vÀĪÀÄPÀÆgÀÄ f¯ÉèAiÀÄ, ²gÁ vÁ®ÆèQ£À°è vÉAUÀÄ ¥ÁPïð ¸Áܦ¸À®Ä
¤«Äðw PÉÃAzÀæ, vÀĪÀÄPÀÆgÀÄ, EªÀjAzÀ MlÄÖ 7 PÁªÀÄUÁjUÀ½UÉ gÀÆ. 263.70 ®PÀëUÀ¼À CAzÁdÄ ¥ÀnÖAiÀÄ£ÀÄß ¥ÀqÉzÀÄ DqÀ½vÁvÀäPÀ
ªÀÄAdÆgÁwUÁV ºÁUÀÆ Grant-in-Aid ©¯ï ªÀÄÆ®PÀ ©qÀÄUÀqÉAiÀiÁzÀ C£ÀÄzÁ£ÀªÀ£ÀÄß ¤«Äðw PÉÃAzÀæ vÀĪÀÄPÀÆgÀÄgÀªÀjUÉ ¸ÀAzÁAiÀÄ
ªÀiÁqÀ®Ä PÉÆÃj ¥Àæ¸ÁÛªÀ£ÉAiÀÄ£ÀÄß ¸À°è¹gÀÄvÁÛgÉ.
¸ÀzÀj ¥Àæ¸ÁÛªÀ£ÉAiÀÄ£ÀÄß ¸ÀPÁðgÀªÀÅ PÀÆ®APÀµÀªÁV ¥Àj²Ã°¹, F PɼÀV£ÀAvÉ DzÉò¹zÉ.
¸ÀPÁðgÀzÀ DzÉñÀ ¸ÀASÉå: vÉÆÃE 52 vÉÆÃ¸À« 2014, ¨ÉAUÀ¼ÀÆgÀÄ, ¢£ÁAPÀ: 18-03-2014
¥Àæ¸ÁÛªÀ£ÉAiÀÄ°è «ªÀj¹gÀĪÀ CA±ÀUÀ¼À »£É߯ÉAiÀİè vÀĪÀÄPÀÆgÀÄ f¯ÉèAiÀÄ ²gÁzÀ°è vÉAUÀÄ ¥ÁPï𠤫Äð¸À®Ä vÀĪÀÄPÀÆgÀÄ ¤«Äðw
PÉÃAzÀæªÀÅ ¸À°è¹gÀĪÀ gÀÆ. 263.70 ®PÀë (gÀÆ¥Á¬Ä E£ÀÆßgÀ CgÀªÀvÀÛ ªÀÄÆgÀÄ ®PÀëzÀ J¥ÀàvÀÄÛ ¸Á«gÀUÀ¼ÀÄ ªÀiÁvÀæ)UÀ¼À CAzÁfUÉ F ªÀÄÆ®PÀ
DqÀ½vÁvÀäPÀ C£ÀĪÀÄwAiÀÄ£ÀÄß ¤ÃqÀ¯ÁVzÉ. vÉÆÃlUÁjPÉ ¤zÉÃð±ÀPÀjUÉ FUÁUÀ¯Éà ©qÀÄUÀqÉAiÀiÁzÀ C£ÀÄzÁ£ÀzÀ°è gÀÆ.25.00 ®PÀë (gÀÆ¥Á¬Ä
E¥ÀàvÉÛöÊzÀÄ ®PÀëUÀ¼ÀÄ ªÀiÁvÀæ)UÀ¼À£ÀÄß Grant-in-Aid ©¯ï ªÀÄÆ®PÀ vÀĪÀÄPÀÆgÀÄ ¤«Äðw PÉÃAzÀæPÉÌ ¸ÀAzÁAiÀÄ ªÀiÁqÀ®Ä vÉÆÃlUÁjPÉ ¤zÉÃð±ÀPÀjUÉ
C£ÀĪÀÄw ¤ÃqÀ¯ÁVzÉ.
F DzÉñÀªÀ£ÀÄß ¸ÀPÁðgÀzÀ DzÉñÀ ¸ÀASÉå : J¥sïr 1 nJ¥sï¦ 2008, ¢£ÁAPÀ 16-05-2008 gÀ£ÀéAiÀÄ ªÀÄvÀÄÛ DzÉñÀ ¸ÀASÉå :
J¥sïr 1 nJ¥sï¦ 2002, ¢£ÁAPÀ 20-01-2003 gÀ°è E¯ÁSÉAiÀÄ ¥ÀæzsÁ£À PÁAiÀÄðzÀ²ðAiÀĪÀjUÉ zÀvÀÛªÁVgÀĪÀ «vÁÛ¢üPÁgÀzÀ£ÀéAiÀÄ ºÁUÀÆ
DAvÀjPÀ DyðPÀ ¸À®ºÉUÁgÀgÀ n¥Ààt ¸ÀASÉå : vÉÆÃE 24 DAD¸À 2014 ¢£ÁAPÀ 12-03-2014 gÀ£ÀéAiÀÄ ºÉÆgÀr¸À¯ÁVzÉ.
PR. 339
S.C. 20
PÀ£ÁðlPÀ gÁdå¥Á®gÀ DeÁÕ£ÀĸÁgÀ ªÀÄvÀÄÛ CªÀgÀ ºÉ¸Àj£À°è,
©.«. gÁªÀİAUÀAiÀÄå,
¸ÀPÁðgÀzÀ C¢üãÀ PÁAiÀÄðzÀ²ð,
vÉÆÃlUÁjPÉ E¯ÁSÉ.
COMMERCE AND INDUSTRIES SECRETARIAT
Sub :
Project Proposal of M/s Prem Sugars & Chemicals Corporation Ltd., to establish a "2500
TCD to 5000 TCD, Co-gen Capacity from 22 to 32 MW and Establishment of 45000 KLPD
Ethanol Plant" at Bellur Village, Nagamangala Taluk, Mandya District - Enhancement of
Crushing Capacity - Reg.
Ref :
1)
Proceeding of the 158th State Level Single Window Clearance Committee meeting
held on 17.09.1996.
2)
Proceedings of the 33rd State High Level Clearance Committee (SHLCC) meeting
held on 19.11.2013.
PREAMBLE:
M/s. Prem Sugars & Chemicals Corporation Ltd., had obtained approval from the Government in ·1996 for establishment
of a White Cristal Sugar manufacturing unit with 2500 TCD capacity and 22 MW Co-gen capacity plant in 98.27 acres of land in
Mandya District.
¨sÁUÀ 1
PÀ£ÁðlPÀ gÁdå¥ÀvÀæ, UÀÄgÀĪÁgÀ, K¦æ¯ï 17, 2014
647
Subsequently M/s Prem Sugars & Chemicals Corporation Ltd.. submitted a proposal for enhancing the crushing capacity
from "2500 TCD. to 5000 TCD Co-gen capacity from 22 to 32 MW and establishment of 45000 KLPD Ethanol Plant". with an investment
of Rs. 450.00 crores in 98.27 acres of land. near Bellur Village, Nagamangala Taluk, Mandya District was discussed in the 174th
Screening. Committee meeting held on 21.12.2012.
The Committee directed the company, to obtain Distance Certificate - from Cane Commissioner: hence the subject was
deferred in the 174th Screening Committee meeting held on 21.12.2012.
The Company in its letter dated: 02.05.2013 have submitted the copy of the Distance Certificate No. DSK/DEV/110/2011-12
(Prem Sugars) dated 05.11.2012 issued by the Cane Commissioner for Cane Development and Director of Sugar. The company has
also filed a necessary application for obtaining IEM, the company has received an acknowledgement from Ministry of Commerce &
Industry, New Delhi vide Ref. No. 2538/SIA/IMO/2012, 2539/SIA/IMO/2012 and 2540/SIA/IMO/2012, dated 12.11.2012 the Company
has also furnished the acknowledgement copy of IEM obtained by Ministry of Commerce & Industries New Delhi.
Agriculture Department vide their letter dated: 09.10.2013 have submitted opinion on the location of the proposed project. It is
opined that the land identified for the project is fit for cultivation and the lands are Kushki farmers are growing single crop in a year.
M/s Prem Sugars & Chemicals Corporation Ltd has been approved in 158th SLSWCC held on 17th September 1996.
The promoter Dr. K.S. Thirumalaswamy has taken license from Government of India to implement the project, during the
implementation process the promoter passed. away during 2004.
The new Directors Mr. Jayadev, Mr. Vishal Jayadev and. Mr. Hari Mohan Naidu joined the Company in 2010 and stated the
process of irnplementation. Subsequently, issues regarding the compensation to land losers was solved and company took
extension of time from KIADB twice in 02.07.2011 & 25.08.2012.
KIADB has approved the building plan on 29.08.2012 valid upto 24.08.2013.
Company has obtained IEM from Ministry of Commerce & Industries, New Delhi vide No. 2538/SIA/IMO 2012 dated:
12.11.2012.
Company also obtained consent for establishment from Karnataka State Pollution Control Board Vide their letter No.
PCB/264/HP 1/2011/887 dated: 20.11.2012.
The company has completed Fencing after taking the possession of land and .approached Corporation Bank for
Financial assistance Bank has given in principle approval for sanctioning. of term loan of Rs. 150.00 crores and insisted
for extension of time.
Company has applied to Karnataka Udyog Mitra for extension of time on 25.05.2012. It is processed in KUM after taking IEM
and placed before SHLSC and it is cleared in 176th Screening Committee meeting held on 13.03.2013 and recommended to
SHLCC to approve the increase in capacity, extension of time and acquire the additional land of 71.8 acres of adjacent land.
The company in its letter dated 14.12.2012 has informed that the Railway Track between Bangalore to Hassan will run
through the existing land due to which the company will not be able to utilise 40 acres of allotted land, accordingly they have requested
to acquire and allot land to an extent of 33.8 acres.
The Company has requested the committee to consider the following:
1.
Increase in crushing capacity 2500 TCD to 5000 TCD.
2.
Increase Co-Gen Capacity from 22 to 32 MW.
3.
Establishment of 45000 LPD Ethanol Plant.
4.
To grant extension of time to implement the earlier approved project by two years.
5.
Acquire and allotment of additional land of 71.8 acres.
Commissioner, Sugar in their letter informed that the factory has obtained IEM from Govt. of India vide· No.
2538/SIA/IMO/2012, dated: 02.11.2012. The said factory has been taken on records as New Sugar Factory vide Govt. of India order
dated: 21.01.2013. Further the applicant is yet to obtain in-principle approval and cane area allocation from Govt. of Karnataka.
In the 33rd State High Level Clearance Committee (SHLCC) Meeting held on 19.11.2013, the proposal of the Company was
discussed and approved.
Government has examined the recommendations made by the' State High Level Clearance Committee in the 33rd Meeting
held on 19.11.2013, in all aspects.
Hence the following order:
GOVERNMENT ORDER No. CI 27 SPI 2014, BANGALORE, DATED: 30.01.2014
Government is pleased to approve the investment proposal, of M/s Prem Sugars & Chemicals Corporation Ltd., to establish a
White Cristal Sugar Manufacturing facility at Kalinganahalli Village, Bellur Hobli. Nagamangala Taluk, Mandya District with a Cane
Crushing Capacity of 5000 TCD, Co-gen Power Plant of 32 MW and 45000 LPD Ethanol Plant with an investment of Rs. 450 crores
generating an employment to about 175 persons.
PÀ£ÁðlPÀ gÁdå¥ÀvÀæ, UÀÄgÀĪÁgÀ, K¦æ¯ï 17, 2014
¨sÁUÀ 1
648
Government is also pleased to extend the following infrastructure and support:
Land :
Existing 98.27 acres of land approved as per the 158th State Level Single
Window Agency meeting in 1996, acquired and in possession of the
Company at Kalinganahalli and Hatni, Villages, Nagamangala Taluk,
Mandya District.
Water :
1.2 Million LPD of Water with the approval of WRD.
Power :
500 KVA from CESC.
Incentives &
Concessions :
As per applicable Industrial Policy of the State.
Sanction of the above infrastructure facilities, incentives and concessions is subject to the following terms and conditions:
1.
Environment: The company to obtain Consent for Establishment and Consent for Operation from KSPCB and environmental
clearance from MoEF, Govt. of India or the Dept of Forest, Ecology & Environment, Govt. of Karnataka, if applicable.
2.
Employment : The Company shall comply with the provisions of industrial Policy of Govt. of Karnataka and Dr. Sorojini
Mahishi Report. Prepare a plan for development of Human. Resources required for the project, train local people. A copy of
Human Resources Development plan shall be sent to. the Commissioner 'for Industrial Development & Director of industries.
and Commerce for monitoring.
3.
Vendor Development: Wherever there is scope for vendor development for the project, the company shall prepare a vendor
development plan, develop local vendors and procure the required inputs, components and 'sub-assemblies from these local
vendor units. A copy of the vendor development plan shall be sent to the Commissioner for Industrial Development & Director
of Industries and Commerce for monitoring.
4.
Social infrastructure Development: .. The. Company is advised to take up social infrastructure development projects in the
vicinity of the proposed location of the unit and comply with the stipulation of Company Act 2013. A copy of such projects
shall be sent to the Commissioner for Industrial Development & Director of Industries and Commerce for monitoring.
5.
Others:
a)
The company shall adopt rainwater harvesting, waste water recycling and water conservation techniques. Zero
discharge facility should be adopted wherever applicable.
b)
The company shall take all statutory and other necessary clearances from the competent authorities including Govt. of
India and shall submit milestones/progress in the implementation of the project regularly, which will be monitored by the
Department.
This approval is valid for a period of two years from the date of issue of this Government Order.
PR 312
By Order and in the name of the Governor of Karnataka,
S. UMADEVI,
Desk Officer (Technical Cell),
Commerce and Industries Department.
COMMERCE AND INDUSTRIES SECRETARIAT
Sub :
Project Proposal of M/s BMM Ispat Ltd., - to establish a unit for manufacture of "2 MTPA
Integrated Steel Plant and Slag Based Cement with 300 MW Power Plant". at Dahapur,
Nagalapura, D.N. Kere and Garage Villages, Marriyammanahalli Hobli. Hospet Taluk,
Bellary District - Extension of time - Reg.
Ref :
1)
Proceedings of the 15th State High Level Clearance Committee (SHLCC) meeting
held on 21.08.2008.
2)
Government Order No. CI 312 SPI 2008, dated: 21.10.2008.
3)
Proceedings of the 33rd State High Level Clearance Committee (SHLCC) meeting
held on 19.11.2013.
PREAMBLE:
The Proposal of M/s BMM Ispat Ltd., to establish a unit for manufacture of "2 MTPA Integrated Steel Plant and Slag Based
Cement Plant with 300 MW Power Plant" at Dahapur, Nagalapura, D.N. Kere and Garaga Villages, Marriyammanahalli Hobli, Hospet
Taluk, Bellary District with an investment of Rs. 6151.00 crore, was approved 15th SHLCC meeting held on 21.08.2008. The
Government Order was issued vide Government Order No. CI 312 SPI 2008, dated: 21.10.2008 read at (2) above.
¨sÁUÀ 1
PÀ£ÁðlPÀ gÁdå¥ÀvÀæ, UÀÄgÀĪÁgÀ, K¦æ¯ï 17, 2014
649
The company has informed that due to the following constraints they were not able to complete the entire 2 MTPA integrated
steel plant within scheduled time.
Environment Clearance (EC) from MOEF, New Delhi was granted in 2010, dated: 18.05.2010.
Consent for establishment (CFE) for 2 MTPA from KSPCB, Bangalore, dated: 02.02.2011.
NOC from Airports Authority of India for the Chimneys dated: 21.07.2011.
Patta Lands were allotted, taken Possession from KIADB in July, 2012, dated: 06~07.2012.
Government Land Government Order was issued by Revenue Dept only in December, 2012; letter no. CI 186 SPQ 2010,
dated: 03.04.2010.
The delay in handing over the land has increased the project cost from Rs. 6151.00 crores to Rs. 7000.00 crores. It is
informed that the company has invested already Rs. 1710.00 crores and the unit is under implementation stage. It may be noted that
the project has been given extension for a period of two years from 24.02.2011 earlier.
Therefore the company has requested the Committee to extend the Government Order for a further period of three years from
24.02.2013.
In the 33rd state High Level Clearance Committee (SHLCC) Meeting held on 19.11.2013, the proposal of the Company was
discussed and approved.
Government has examined the recommendations made by the State High Level Clearance Committee in the 33rd Meeting
held on 19.11.2013, in all aspects.
Hence the following order.
GOVERNMENT ORDER No. CI 27 SPI 2011, BANGALORE, DATED: 13.01.2014
The Government is pleased to grant extension of time to M/s BMM Ispat Ltd., to implement the project approved vide
Government Order No. CI 312 SPI 2008, dated: 21.10.2008 for further period of two years from the date of issue of this order.
All other terms and conditions indicated in the Government Order dated: 21.10.2008 read at (2) above, remain unaltered.
PR 313
By Order and in the name of the Governor of Karnataka,
S. UMADEVI,
Desk Officer (Technical Cell),
Commerce and Industries Department.
COMMERCE AND INDUSTRIES SECRETARIAT
Sub :
Project Proposal of M/s Amrutha Constructions Pvt. Ltd., to establish a "2 MMTPA
Cement Plant with 50 MW Coal Based Captive Power Plant" near Maralbhavi Village,
Surpura Taluk, Yadgir District - Extension of time - Reg.
Ref :
1)
Proceedings of the 24th State High Level Clearance Committee (SHLCC) meeting
held on 21.01.2011.
2)
Government Order No. CI 91 SPI 2011, dated: 26.02.2011.
3)
Proceedings of the 33rd State High Level Clearance Committee (SHLCC) meeting
held on 19.11.2013.
PREAMBLE:
The Proposal of M/s Amrutha Constructions Pvt. Ltd., to establish "2 MMTPA Cement Plant with 50 MW Coal Based Captive
Power Plant" near Maralbhavi Village, Surpura Taluk, Yadgir District with an investment of Rs. 960.00 crore, was approved in the 24th
SHLCC meeting held on 24.01.2011. The Government Order was issued vide Government Order No. 91 SPI 2011, dated: 26.02.2011
read at (2) above.
Now, the company in their letter dated: 25.2.2013 has requested to issue an amended Government Order for transfer of
approval from M/s Amrutha Constructions (P) Ltd., to M/s Amrutha Bose Cement Industries Pvt. Ltd. and inclusion of Salvadgi Village,
Bijapur District in additional to Maralbhavi Village of Yadgir District. The following documents have been submitted by the company.
Memorandum & Articles of Association of the new company.
Board resolution dated: 09.02.2013 of M/s Amrutha Constructions Pvt. Ltd.. to incorporate the new company i.e. M/s Amrutha
Bose Cement Industries Pvt. Ltd. with 51 & equity shares.
Board resolution dated: 23.02.2013 of M/s Amrutha Constructions Pvt. Ltd., subscribing 255000 equity shares of Rs. 10/- in
the new company.
Certificate of incorporation of the new company has been furnished.
PÀ£ÁðlPÀ gÁdå¥ÀvÀæ, UÀÄgÀĪÁgÀ, K¦æ¯ï 17, 2014
¨sÁUÀ 1
650
In the 33rd State High Level Clearance Committee (SHLCC) Meeting held on 19.11.2013, the proposal of the Company was
discussed and approved.
Government has examined the recommendations made by the State. High Level Clearance Committee in the 33rd Meeting
held on 19.11.2013, in all aspects.
Hence the following order.
GOVERNMENT ORDER No. CI 91 SPI 2011, BANGALORE, DATED: 09.01.2014
The Government is pleased to approve the change the name of the company of M/s Amrutha Constructions Pvt. Ltd., to M/s
Amrutha Bose Cement Industries Pvt. Ltd., for the project approved vide Government Order No. CI 91 SPI 2011, dated: 26.02.2011 as
per the norms of KIADB and grant extension of time to the company to implement the project for further period of two years from the
date of issue of this order.
All other terms and conditions indicated in the Government Order dated: 26.02.2011 read at (2) above, remain unaltered.
PR 314
By Order and in the name of the Governor of Karnataka,
S. UMADEVI,
Desk Officer (Technical Cell),
Commerce and Industries Department.
COMMERCE AND INDUSTRIES SECRETARIAT
Sub :
Project Proposal of M/s Mukund Ltd., - for "Expansion of Integrated Steel Plant Capacity
from 0.41 MTPA to 0.70 MTPA" at Koppal District - Extension of time - Reg.
Ref :
1) Proceedings of the 23rd State High Level Clearance Committee (SHLCC) meeting
held on 19.06.2010.
2) Government Order No. CI 372 SPI 2010, dated: 15.07.2010.
3) Corrigendum No. CI 372 SPI 2010, dated: 01.03.2011.
4) Proceedings of the 33rd State High Level Clearance Committee (SHLCC) meeting
held on 19.11.2013.
PREAMBLE:
The Proposal of M/s Mukund Ltd., to increase the "Integrated Steel Plant Capacity by 0.70 MTPA" at Koppal District with an
investment of Rs. 2892.00 crore. was approved 23rd SHLCC meeting held on 19.06.2010. The Government 'Order was issued vide
Government Order No. CI 372 SPI 2010, dated: 15.07.2010 read at (2) above.
A Corrigendum read at (3) above was issued to correct the increased capacity as 1.11 MMTPA.
The company in their letter dated: 27.02.2013 informed that they have purchased the 53 acres of land and the remaining land
is under the process of purchasing. The company has made an application to Water Resource Dept. for allotment of 18 MLPD of water
and has requested to grant extension of time further for a period.
In the 33rd State High Level Clearance Committee (SHLCC) Meeting held on 19.11.2013, the proposal of the Company was
discussed and approved.
Government has examined the recommendations made by the State High Level Clearance Committee in the 33rd Meeting
held on 19.11.2013, in all aspects.
Hence the following order.
GOVERNMENT ORDER No. CI 372 SPI 2010, BANGALORE, DATED: 04.01.2014
The Government is pleased to grant extension of time to M/s Mukund Ltd., to implement the project approved vide
Government Order No. CI 372 SPI 2010, dated: 15.07.2010 for further period of two years from the date of issue of this order.
All other terms and conditions indicated in the Government Order dated: 15.07.2010 read at (2) above, remain unaltered.
PR 315
By Order and in the name of the Governor of Karnataka,
S. UMADEVI,
Desk Officer (Technical Cell),
Commerce and Industries Department.
¨sÁUÀ 1
PÀ£ÁðlPÀ gÁdå¥ÀvÀæ, UÀÄgÀĪÁgÀ, K¦æ¯ï 17, 2014
651
COMMERCE AND INDUSTRIES SECRETARIAT
Sub :
Project Proposal of M/s Tata Elxsi Ltd., - to establish "Hardware Design and
Development Centre" at KIADB Hardware Industrial Park, Bangalore Rural District
Extension of time - Reg.
Ref :
1) Proceedings of the 20th State High Level Clearance Committee (SHLCC) meeting
held on 05.01.2010.
2) Government Order No. CI 77 SPI 2010, dated: 01.03.2010.
3) Proceedings of the 33rd State High Level Clearance Committee (SHLCC) meeting
held on 19.11.2013.
PREAMBLE:
The Proposal of M/s Tata Elxsi Ltd., to establish the "Hardware Design and Development Centre" at KIADB Hardware
Industrial Park, Bangalore Rural District with an investment of Rs. 486.00 crores in 20 acres of KIADB land was approved 20th SHLCC
meeting held on 05.01.2010. The Government Order .was issued vide Government Order No. CI 77 SPI 2010, dated: 01.03.2010 read
at (2) above.
The company has informed that there was a delay in implementation of the project because of delay by KIADB in developing
the said industrial Area. Therefore the company has not paid the initial deposit. The company vide its letters dated: 31.07.2012,
11.12.2012 and e-mail dated: 06.06.2013 requested to grant extension of time further for a period of two years.
In the 33rd State High Level Clearance Committee (SHLCC) Meeting held on 19.11.2013, the proposal of the Company was
discussed and approved.
Government has examined the recommendations made by the State High Level Clearance Committee in the 33rd Meeting
held on 19.11.2013, in all aspects.
Hence the following order.
GOVERNMENT ORDER No. CI 77 SPI 2010, BANGALORE, DATED: 13.01.2014
The Government is pleased to grant extension of time to M/s Tata Elxsi Ltd., to implement the project approved vide
Government Order No. CI 77 SPI 2010, dated: 01.03.2010 for further period of two years from the date of issue of this order.
All other terms and conditions indicated in the Government Order dated: 01.03.2010 read at (2) above, remain unaltered.
PR 316
By Order and in the name of the Governor of Karnataka,
S. UMADEVI,
Desk Officer (Technical Cell),
Commerce and Industries Department.
COMMERCE AND INDUSTRIES SECRETARIAT
Sub :
Project Proposal of M/s. Narth Karnataka Power Pvt. Ltd.,(formerly known as M/s Jewargi
Power Pvt. Ltd.,) - to establish "2 X 660 MW Coal Based Power Plant" at Killenkere,
Neelhalli, Kalebelgondi Villages, Yadgir District - Reg.
Ref :
1) Proceedings of the 13th State High Level Clearance Committee (SHLCC) meeting
held on 13.03.2008.
2) Government Order No. CI 175 SPI 2008, dated: 19.05.2008.
3) Amendment No. CI 175 SPI 2008, dated: 20.12.2010.
4) Government Order No. CI 175 SPI 2008, dated: 20.12.2010.
5) Proceedings of the 33rd State High Level Clearance Committee (SHLCC) meeting
held on 19.11.2013.
PREAMBLE:
The Proposal of M/s Narth Karnataka Power Pvt. Ltd., (formerly known as M/s Jewargi Power Pvt. Ltd.,) to establish "2 X 660
MW Coal Based Power Plant" with an investment of Rs: 6757.84 crores in 1800 acres of land to be acquired and allotted by KIADB at
Kattisangavi and Madri Villages, Jewargi Taluk, Gulbarga District was approved 13th SHLCC meeting held on 13.03.2008. The
Government Order was issued vide Government Order No. CI 175 SPI 2008, dated: 19.05.2008 read at (2) above.
As per request of company an Amendment Order read at (3) above was issued to change of name of company from
M/s Jewargi Power Pvt. Ltd., in favour of "M/s Narth Karnataka Power Pvt. Ltd."
Subsequently, the company has requested for change of location of the project of M/s Narth Karnataka Power Pvt. Ltd., from
Kattisangavi and Madri villages of Jewargi Taluk, Gulbarga District to Killenkere, Neelhalli, Kalebelgondi villages of Yedgir District was
approved and vide Government Order No. CI 175 SPl 2008, dated: 20.12.2010 read at (4) above.-
PÀ£ÁðlPÀ gÁdå¥ÀvÀæ, UÀÄgÀĪÁgÀ, K¦æ¯ï 17, 2014
¨sÁUÀ 1
652
The company in its letter has requested for change of name of the company from M/s Narth Karnataka Power Pvt. Ltd., to
North Karnataka Powergen Pvt. Ltd. The certificate of Incorporation dated: 27.11.2012 is furnished. Further the company secretary has
also submitted a certificate giving the names of the 5 Directors as per the Register of Director of the Company and the forms filed with
MCA. It is informed that, the Directors of Narth Karnataka Power Pvt. Ltd., and North Karnataka Powergen Pvt. Ltd., (if approved for
change of name) are the same Directors.
In the 33rd State High Level Clearance Committee (SHLCC) Meeting held on 19.11.2013, the proposal of the Company was
discussed and approved.
Government has examined the recommendations made by the State High Level Clearance Committee in the 33rd Meeting
held on 19.11.2013, in all aspects.
Hence the following order.
GOVERNMENT ORDER No. CI 20 SPl 2014 , BANGALORE, DATED: 13.01.2014
The Government is pleased to approve the change of name of the company from M/s Narth Karnataka Power Pvt. Ltd., to
"M/s North Karnataka Powergen Pvt. Ltd.." and to grant extension of time to implement the project approved vide Government Order
No. CI 175 SPI 2008, dated: 19.05.2008 for further period of two years from the date of issue of this order.
All other terms and conditions indicated in the Government Order dated: 19.05.2008 read at (2) above, remain unaltered.
PR 317
By Order and in the name of the Governor of Karnataka,
S. UMADEVI,
Desk Officer (Technical Cell),
Commerce and Industries Department.
COMMERCE AND INDUSTRIES SECRETARIAT
Sub :
Project Proposal of M/s N K Utilities Ltd., to establish "300 M W Coal Based Power Plant"
at Achanur Village, Bagalkot District - Extension of time - Reg.
Ref :
1) Proceedings of the 16th and 20th State High Level Clearance Committee (SHLCC)
meeting held on 19.11.2008 and 05.01.2010.
2) Government Order No. CI 261 SPI 2010, dated: 18.06.2010.
3) Proceedings of the 33rd State High Level Clearance Committee (SHLCC) meeting
held on 19.11.2013.
PREAMBLE:
The Proposal of M/s. N K Utilities Ltd., to establish "300 MW Coal Based Power Plant" at Kagalagomba Village, Bagalkot
District with an investment of Rs. 1740.00 crore. was approved in the 16th SHLCC meeting held on 19.11.2008. Subsequently in the
20th SHLCC meeting held on 05.01.2010 the committee approved to establish unit in 500 acres of land (225 acres u/s 109 of KLR Act
and 275 acres from KIADB as SUC) and also approved for change of location to Achanur Village, Bagalkot District. The Government
Order was issued vide Government Order No. CI 261 SPI 2010, dated: 18.06.2010 read at (2) above.
Now, The Company in their letter dated: 15.07.2013 informed that, they have started civil works at the project site after
obtaining the water allocation as per the conditions stipulated by Department of Ecology and Environment that ''the project authorities
shall commence the construction activity only after obtaining required approval from competent authority of supply of water for the
project". The company has granted water allocation of 0.52 TMC from Ghataprabha River vide Government Order dated: 14.03.2013.
The company is requesting the committee to approve for extension of 3 more years of time to implement the project.
The company has informed that the following effective steps were initiated to implement the project.
1. LAND: 243 acres of private lands in Achanur village have been acquired U/s 109 of KLR Act and through KIADB.
2. Environmental Clearance: State Level Environment Impact Assessment Authority, Karnataka State (SEIAA) has issued
the Environment Clearance vide letter dated: 18.01.2011
3. Consent of Establishment: Karnataka State Pollution Control Board has issued Consent for Establishment (CFE) vide
letter dt: 21.05.2011
4. COAL: Coal has been tied up for M/s Fajar Bumi Sakti Ltd, Indonesia and contract agreement has been signed. Coal will
reach site from Goa Port and by rail via Gadag. The railway line is just 5 KM from the site.
5. WATER: Granted water allocation order from the government on 14.03.2013 for 0.52 TMC from Ghataprabha River.
6. SURVEY: Railway survey, Contour survey, water line survey and, power evacuation line survey have been completed by
the notified agencies.
In the 33rd State High Level Clearance Committee (SHLCC) Meeting held on 19.11.2013, the proposal of the Company was
discussed and approved.
¨sÁUÀ 1
PÀ£ÁðlPÀ gÁdå¥ÀvÀæ, UÀÄgÀĪÁgÀ, K¦æ¯ï 17, 2014
653
Government has examined the recommendations made by the State High Level Clearance Committee in the 33rd Meeting
held on 19.11.2013, in all aspects.
Hence the following order.
GOVERNMENT ORDER No. CI 261 SPl 2010, BANGALORE, DATED: 06.01.2014
The Government is pleased to grant extension of time to Mi/s N K Utilities Ltd., to implement the project approved vide
Government Order No. CI 261 SPI 2010, dated: 18.06.2010 for further period of two years from the date of issue of this order.
All other terms and conditions indicated in the Government Order dated: 18.06.2010 read at (2) above, remain unaltered.
PR 318
By Order and in the name of the Governor of Karnataka,
S. UMADEVI,
Desk Officer (Technical Cell),
Commerce and Industries Department.
COMMERCE AND INDUSTRIES SECRETARIAT
Sub :
Project Proposal of M/s Trans India Shipping Services Pvt. Ltd., to establish" 1.0 MTPA
Integrated Steel Plant and 150 MW Captive Power Plant" at Elladakere, Hiriyur,
Chitradurga District - Extension of time - Reg.
Ref :
1) Proceedings of the 23rd State High Level Clearance Committee (SHLCC) meeting
held on 19.06.2010.
2) Government Order No. CI 373 SPI 2010, dated: 15.07.2010.
3) Government Order No. CI 373 SPI 2010, dated: 28.02.2011 .
4) Proceedings of the 33rd State High Level Clearance Committee (SHLCC) meeting
held on 19.11.2013.
PREAMBLE:
The Proposal of M/s Trans India Shipping Services Pvt. Ltd., to establish "1.0 MTPA - Enhancement of Integrated Steel Plant
and 150 M W Captive Power Plant" at Elladakere, Hiriyur, Chitradurga District with an investment of Rs. 1975.00 crore, was approved
23rd SHLCC meeting held on 19.06.2010. The Government Order was issued vide Government Order No. CI 373 SPI 2010,
dated: 15.07.2010 read at (2) above.
The Government Order read at (3) above was issued to approve the enhancement of Integrated Steel Plant capacity from 0.5
MMTPA to 1.00 MMTPA and the Captive Power Plant Capacity from 72 MW to 150 MW with allotment of additional land of 210 acres
and 2800 KLPD Water.
Now, the company in their letter dated: 27.09.2013 has requested for extension of time by five years to implement the project
since the Government order No. CI 373 SPI 2010, dated: 15.07.2010 was expired on 14.07.2012. The company has taken following
effective steps to implement the project.
a)
The company has obtained allotment of 440.05 acres of land from KIADB and possession certificate was also obtained.
b)
Applied to WRD for allotment of water
In the 33rd State High Level Clearance Committee (SHLCC) Meeting held on 19.11.2013, the proposal of the Company was
discussed and approved.
Government has examined the recommendations made by the State High Level Clearance Committee in the 33rd Meeting
held on 19.11.2013, in all aspects.
Hence the following order.
GOVERNMENT ORDER No. CI 16 SPI 2014, BANGALORE, DATED: 06.01.2014
The Government is pleased to grant extension of time to M/s Trans India Shipping Services Pvt. Ltd., to implement the
project approved vide Government Order No. CI 373 SPI 2010, doted: 15.07.2010 for further period of two years from the date of
issue of this order.
All other terms and conditions indicated in the Government Order dated: 15.07.2010 read at (2) above, remain unaltered.
PR 319
By Order and in the name of the Governor of Karnataka,
S. UMADEVI,
Desk Officer (Technical Cell),
Commerce and Industries Department.
PÀ£ÁðlPÀ gÁdå¥ÀvÀæ, UÀÄgÀĪÁgÀ, K¦æ¯ï 17, 2014
¨sÁUÀ 1
654
COMMERCE AND INDUSTRIES SECRETARIAT
Sub :
Project Proposal of M/s Dhruvdesh Metasteel Pvt. Ltd., - to establish an unit for
manufacture of "Mini Integrated Steel Plant with 10 MW Captive Power Plant" at
Hirebaganal Village, Ginegera Post, Koppal District - Extension of time - Reg.
Ref :
1) Proceedings of the 13th State High Level Clearance Committee (SHLCC) meeting
held on 13.03.2008.
2) Government Order No. CI 72 SPI 2008, dated: 29.04.2008.
3) Proceedings of the 33rd State High Level Clearance Committee (SHLCC) meeting
held on 19.11.2013.
PREAMBLE:
The Proposal of M/s Dhruvdesh Metasteel Pvt. Ltd., to establish an "Mini Integrated Steel Plant with 10 MW Captive Power
Plant" at Hirebaganal Village, Ginegera Post, Koppal District with an investment of Rs. 145.78 crores in 46.07 acres of land was
approved 13th SHLCC meeting held on 13.03.2008. The Government Order was issued vide Government Order No. CI 72 SPI 2008,
dated: 29.04.2008 read at (2) above .
Now, the company vide its letter dated: 23.10.2013 has submitted that, they have already commissioned the "Second Unit
100 TPD Sponge Iron Plant and 10 MW Captive Power Plant'' with a capital investment of Rs. 120.00 Crores and created employment
for about 300 persons. But however all the facilities are not implemented due to the following reasons:
a)
Mining Lease - The allotted ore reserve in Chikanayakanahalli of about 1 Million TPD is in sufficient.
b)
On absence of the sufficient ore, company is compelled to purchase iron ore from the open market at very high rates
which have affected the margins under these circumstances bankers have advised the company to implement the
project in phases.
c)
The procedural delays in taking physical possession of land.
d)
Now, bankers are seeking extension of time for implementation of the project for further funding .
In view of the above, company has requested for extension of time for 2 1/2 years to implement the project.
In the 33rd State High Level Clearance Committee (SHLCC) Meeting held on 19.11 .2013, the proposal of the Company was
discussed and approved.
Government has examined the recommendations made by the State High Level Clearance Committee in the 33rd Meeting
held on 19.11.2013, in all aspects.
Hence the following order.
GOVERNMENT ORDER No. CI 36 SPl 2010, BANGALORE, DATED: 13.01.2014
The Government is pleased to grant extension of time to M/s Dhruvdesh Metasteel Pvt. Ltd., to implement the
project approved vide Government Order No. CI 72 SPI 2008, dated: 29.04.2008 for further period of two years from the date of
issue of this order.
All other terms and conditions indicated in the Government Order dated: 29.04.2008 read at (2) above, remain unaltered.
PR 320
By Order and in the name of the Governor of Karnataka,
S. UMADEVI,
Desk Officer (Technical Cell),
Commerce and Industries Department.
COMMERCE AND INDUSTRIES SECRETARIAT
CORRIGENDUM
No. CI 162 SPI 2013, Bangalore, Dated: 17th January, 2014
Sub :
Project Proposal of M/s Dhruvdesh Metasteel Pvt. Ltd., - to establish an unit for
manufacture of "Iron Ore Pellets" at Hirebaganal Village, Koppal District - Reg.
Ref :
Government Order No. CI 162 SPI 2013, dated: 27.09.2013.
In the order portion of the Government Order No: CI 162 SPI 2013, dated: 27.09..2013, the paragraph .
"Land :
The Company is permitted to purchase 28 acre 08 gunta land (excluding Government
and Forest lands) at Hirebanganal Village, Koppal District under Section 109 of
Karnataka Land Reforms Act,1961 and for conversion of the land use".
¨sÁUÀ 1
PÀ£ÁðlPÀ gÁdå¥ÀvÀæ, UÀÄgÀĪÁgÀ, K¦æ¯ï 17, 2014
655
shall be read as;
"land :
The Company is permitted to purchase and convert for lndustrial use land in Sy. Nos.
86, 87, 89/1,89/2,90/2 & 91/2 of Chickabagnal Village, Koppel Taluk and District
measurlng 15 acres 10 guntas and Sy.· Nos. 85/G, 85/D, 85/E, 85/F of Kunikere Village,
Koppal Taluk and District measuring 13 acres 38 guntas (totaling. 29 acres and 8
guntas) U/s 109 of KLR Act, 1961".
The other terms and conditions remain the same as in the G.O read at above.
PR 321
By Order and in the name of the Governor of Karnataka,
S. UMADEVI,
Desk Officer (Technical Cell),
Commerce and Industries Department.
COMMERCE AND INDUSTRIES SECRETARIAT
Sub :
Project Proposal of M/s Orient Cement Ltd., - to establish "Cement Plant for Manufacture
of 4 MTPA Cement and 3 MTPA Clinker with 50 MW Captive Power Plant" at Itagi, Mogla,
Digaon Villages, Chittapur Taluk, Gulbarga District Reg.
Ref :
1) Proceedings of the 17th State High Level Clearance Committee (SHLCC) meeting
held on 28.01.2009.
2) Government Order No. CI 60 SPI 2009, dated: 11.08.2009.
3) Proceedings of the 33rd State High Level Clearance Committee (SHLCC) meeting
held on 19.11.2013
PREAMBLE:
The Proposal of M/s Orient Cement Ltd., to establish "Cement Plant for Manufacture of 4 MTPA Cement and 3 MTPA Clinker
with 50 MW Captive Power Plant" at Itagi, Mogla, Digaon Villages, Chittapur Taluk, Gulbarga District with an investment of Rs. 1294.00
crore, was approved 17th SHLCC meeting held on 28.01.2009. The Government Order was issued vide Government Order No. CI 60
SPI 2009, dated: 11.08.2009 read at (2) above.
The company in their letter dated: 21.09.2012 informed that they have already purchased 1323 acres of land out of 1750
acres U/s 109 of KLR Act and requested for granting permission for replacement of 275 acres of Gomala & Government land which are
out of their required area, with lands which are within their mining and factory area to make it contigious one.
Accordingly, company in their letter dated: 27.09.2012 have submitted list of revised sy. nos indicating the area required to the
extent of 1750 acres for mining and cement factory including power plant and requested for approval to purchase these lands U/s 109 of
KLR Act.
There is no change in the extent of the land and also the villages. In view of this, the subject was placed in the 174th State
High Level Screening Committee held on 21.12.2012.
The proposal of the company was discussed in detail and the committee directed the company to furnish details of effective
steps taken to implement the project and deferred. The company in its letter No: ORCEM:PROJ:0458, dated: 20.12.2012 has submitted
the status of implementation of the project.
Further the company in its letter No:OREC:PROJ:4406 dated: 20.12.2012 has requested the additional land which is
necessitated due to following facts as stated in the referred letter.
1.
Government of India, Ministry of Environment & Forests (MOEF) directive for Green belt
development in 33% of project area.
2.
Construction of water tanks for storing water requirement for five months operation Cement Plant,
Power plant, Limestone mining, Residential colony etc. as Government of Karnataka likely to
allow us water pumping for the river for only seven months in a year and for balance five months,
the requirement has to be met from storage.
3.
Construction of railway line form Chittapur railway station to railway siding within our cement plant
area.
4.
Providing land to KPTCL for switch yard etc, outside the factory area.
5.
Construction of Staff Colony, Dispensary, School & other civic amenities etc.,
Hence the company has requested the committee to consider and approve the following:
PÀ£ÁðlPÀ gÁdå¥ÀvÀæ, UÀÄgÀĪÁgÀ, K¦æ¯ï 17, 2014
¨sÁUÀ 1
656
"Revised sy. nos indicating the area required to the extent of 1750 acres for mining and cement factory including power plant".
In the 33rd State High Level Clearance Committee (SHLCC) Meeting held on 19.11 .2013, the proposal of the Company was
discussed and approved.
Government has examined the recommendations made by the State High Level Clearance Committee in the 33rd Meeting
held on 19.11.2013, in all aspects.
Hence the following order.
GOVERNMENT ORDER No. CI 60 SPl 2009, BANGALORE, DATED: 09.01.2014
The Government is pleased to approve acquisition of 275 acres of land in Sy. Nos. as per the Annexure out of the 1750 acres
already acquired for the project and grant extension of time to M/s Orient Cement Ltd., to implement the project approved vide
Government Order No. CI 60 SPI 2009, dated: 11.08.2009 for further period of two years from the date of issue of this order.
All other terms and conditions indicated in the Government Order dated: 11.08.2009 read at (2) above, remain unaltered.
PR 322
By Order and in the name of the Governor of Karnataka,
S. UMADEVI,
Desk Officer (Technical Cell),
Commerce and Industries Department.
COMMERCE AND INDUSTRIES SECRETARIAT
Sub :
Proposal of M/s Manyata Developers Pvt. Ltd., - to Unit-II for "IT/BT/BPO Park with Hotel,
Serviced Apartments, Residential Condominium and Other Common Facilities" at
Kotnatevaru, Kondanahalli and Gollahalli Villages, Devanahalli Taluk, Bangalore Rural
District - Extension of time - Reg.
Ref :
1) Proceedings of the 22nd State High Level Clearance Committee (SHLCC) meeting
held on 24.05.2010.
2) Government Order No. CI 190 SPI 2010, dated: 02.06.2010.
3) Government Order No. CI 158 SPI 2012, dated: 15.03.2013.
4) Proceedings of the 33rd state High Level Clearance Committee (SHLCC) meeting
held on 19.11.2013.
PREAMBLE:
The Proposal of M/s Manyata Developers Pvt. Ltd., to establish a "IT/BT/BPO Park with Hotel, Serviced Apartments,
Residential Condominium and Other Common Facilities" at Kotnatevaru, Kondanahalli and Collcholli Villages, Devanahalli Taluk,
Bangalore Rural District with an investment of Rs. 1880.27 crore, was approved 22nd SHLCC meeting held on 24.05.2010. The
Government Order was issued vide Government Order No. CI 190 SPI 2010, dated: 02.06.2010 read at (2) above.
In the 33rd State High Level Clearance Committee (SHLCC) Meeting held on 19.11.2013, The State High Level Clearance
Committee noted the opinion given by the Advocate General of Karnataka in his letter dated: 06.11.2013 regarding M/s Manyata
Developers Pvt. Ltd.. as per the decision of 32nd SHLCC. Committee noted the Advocate General of Karnataka's opinion which is as
under:
"Even without resorting to the process of securing change of land use under Section 14 A of the KT & CP Act, it is open to
issue a declaration under Section 3 of the KIAD Act if the following steps are adhered to before doing so:
1)
The Government should balance the requirements of both enactments to so as to provide an
harmonious construction of both the statutes.
2)
Before a Notification under Section 3( 1) of the KIAD Act, the Government should consider the
fact that such a declaration would result in change of land use.
3)
There should be a clear indication of the application of mind to all aspects of the matter relating to
change of land use where the land is to be declared as an industrial area as against the earlier
earmarking for a different purpose.
4)
There should be a clear finding that development of such industry is possible only in that area and
that area alone is suitable for the purpose and that there is no other alternative,
If these steps precede the decision to notify under Section 3 (1), then the Notification under Section 3 (1) of the Act would be
legal and valid.
¨sÁUÀ 1
PÀ£ÁðlPÀ gÁdå¥ÀvÀæ, UÀÄgÀĪÁgÀ, K¦æ¯ï 17, 2014
657
Further Advocate General has mentioned that pursuant to the resolution of the State High Level Clearance Committee dated:
24.05.2010, a Government Order was issued on 04.06.2010. A perusal of the said G.O indicates that the G.O is valid only for a period
of two years. In other words, the Government Order approving the project in question has lapsed on the expiry of two years from the
said date. In this view of the matter, if the Government is still interested in considering the project, the entire exercise will have to be
undertaken afresh in the light of the law set out in the earlier paragraphs.
The committee noted the opinion of the Advocate General along with the fallowing salient features in the present case. A
conjoint reading of both the facts at hand herein and the opinion of the learned Advocate General would summate as under:
The Karnataka Industrial Area Development Act, 1966 is an enactment not only with an intent and purport of developing
industrial area in the state but also to have a planned approach of industrial lands. The initiatives of planning in terms of the KT & CP
Act and the KIAD Act, 1966 are to be in consonance with one another. In view of the aforementioned the following facts were discussed:
1)
The lands in question form a part of a contiguous block with the lands notified for IT Park Industrial Area in terms of an
earlier notification, dated 25.09.2008. Not to mention contiguity, compactness and integrated nature of the land adds to
the already existing industrial infrastructure created for the IT Park Industrial Area. In view of the same the contiguity,
compactness and existing infrastructure form the furtherance of the essential object of both the enactments, the KT & CP
Act and the KIAD Act, i.e.. planned development.
2)
A combined layout map of Bangalore Hardware - IT /BT - Areospace and SEZ Parks at Devanahalli, Bangalore adjacent
to the Bangalore International Airport (yet another acquisition under the KIADB, i.e.. industrial land) are part of villages
that are adjacent to the present lands forming a contiguous, compact block of industrial lands. Not to mention the project
proponent has procured the consent of the land owners whose lands are situated adjacent and adjoining to the existing
land situated at ITBT Industrial Area. The proposed acquisition will enable the formation of a better, larger and well
equipped industrial land/area rather than having a small piece/patch of lands earmarked for agriculture amongst, rather in
the midst, of large contiguous industrial lands.
3)
The lands proposed to be acquired for the project proponent herein are situated at Gollahalli-Kotnathevaru-Kondanahalli
villages. All villages adjoining the area proposed for the project herein, i.e., Bandikodigehalli Gollahalli, Singalli,
Arebinnmangala. Huvinaykanahalli, Mahadevakodigenahalli, B. K. Palya, kothnathevaru, Kondanahalli for industrial areas
acquired for Hardware - IT /BT - Areospace and SEZ Parks. These lands are already existing industrial lands. The lands
proposed for acquisition form a contiguous block with the lands mentioned hereinabove. In view of the contiguity,
compactness and integrated nature the lands are ideally suited for industrial usage.
4)
The said lands are for a Single Unit Complex and incidentally the project proponent has procured consent as regards
most of the lands proposed for acquisition. The requirement of a track to an extent as required by the petitioner coupled
with other factors as mentioned hereinabove make the proposal of the project feasible in 'the very lands and the said
lands are the only lands ideally suited for the project.
Incidentally, the opinion of the learned Advocate General read in consonance with the facts on hand in the present case
would reveal that the lands are ideally suited for the proposed project and the same is to be encouraged. The case at hand herein is
one wherein change in land use as contemplated under the KT & CP Act, is not required as the case squarely fits into the parameters
as assigned by the learned Advocate General for harmonious reading of both enactments, i.e., the KT & CP Act and the KIAD Act. In
turn, making the proposal at hand, a fit case for issuance of notification under section 3(1) of KIAD Act, 1966.· In view of the same the
committee decided to encourage the project. The committee ratified the issuance of GO dated 15.3.2013 and granted 2 years extension
of time to implement the project.
Government has examined the recommendations made by the State High Level Clearance Committee in the 33rd Meeting
held on 19.11 .2013, in all aspects.
Hence the following order.
GOVERNMENT ORDER No. CI 158 SPI 2012, BANGALORE, DATED: 03.01.2014
Action taken by Commerce and Industries Department as per Government Order No. CI 158 SPI 2012, dated: 15.03.2013 is
ratified. Further the Government is pleased to grant two years extension of time from the date of issue of this order to M/s Manyata
Developers Pvt. Ltd., to implement the project approved vide Government Order No. CI 190 SPI 2010, dated: 02.06.2010 and
Government Order No. CI 158 SPI 2012, dated: 15.03.2013.
AII other terms and conditions indicated in the Government Order dated: 02.06.2010 read at (2) above, remain unaltered.
PR 323
By Order and in the name of the Governor of Karnataka,
S. UMADEVI,
Desk Officer (Technical Cell),
Commerce and Industries Department.
PÀ£ÁðlPÀ gÁdå¥ÀvÀæ, UÀÄgÀĪÁgÀ, K¦æ¯ï 17, 2014
¨sÁUÀ 1
658
£ÀUÀgÁ©üªÀÈ¢Þ ¸ÀaªÁ®AiÀÄ
C¢üPÀÈvÀ eÁÕ¥À£À
¸ÀASÉå: £ÀCE 39 ¸ÀªÀÄ£ÀéAiÀÄ 2014 ¨ÉAUÀ¼ÀÆgÀÄ, ¢£ÁAPÀ: 01-03-2014
«µÀAiÀÄ
:
£ÀUÀgÁ©üªÀÈ¢Þ E¯ÁSÉAiÀÄ mÉAqÀgï §Ä¯Én£ï£À°è ¥ÀæPÀn¸À®Ä C¥ÀgÀ PÁAiÀÄðzÀ²ð £ÀUÀgÁ©üªÀÈ¢Þ
E¯ÁSÉ EªÀgÀ£ÀÄß mÉAqÀgï §Ä¯Én£ï C¢üPÁjAiÀÄ£ÁßV £ÉëĸÀĪÀ §UÉÎ.
G¯ÉèÃR :
¸ÀªÀĸÀASÉåAiÀÄ C¢üPÀÈvÀ eÁÕ¥À£À, ¢£ÁAPÀ: 27-01-2014.
G¯ÉèÃTvÀ C¢üPÀÈvÀ eÁÕ¥À£ÀzÀ°è £ÀUÀgÁ©üªÀÈ¢Þ E¯ÁSÉAiÀÄ mÉAqÀgï £ÉÆÃn¦üPÉõÀ£ï ¥Àæ¸ÁÛªÀ£ÉUÀ¼À£ÀÄß mÉAqÀgï §Ä¯Én£ï£À°è ¥ÀæPÀn¸À®Ä
¸ÀPÁðgÀzÀ C¥ÀgÀ PÁAiÀÄðzÀ²ð, £ÀUÀgÁ©üªÀÈ¢Þ E¯ÁSÉ EªÀgÀ£ÀÄß mÉAqÀgï §Ä¯Én£ï C¢üPÁjAiÀÄ£ÁßV £ÉëĸÀ¯ÁVzÀÄÝ EzÀ£ÀÄß ªÀiÁ¥Àðr¹
EªÀgÀ §zÀ¯ÁV ¸ÀPÁðgÀzÀ G¥À-PÁAiÀÄðzÀ²ð-2, £ÀUÀgÁ©üªÀÈ¢Þ E¯ÁSÉ EªÀgÀ£ÀÄß mÉAqÀgï §Ä¯Én£ï C¢üPÁjAiÀÄ£ÁßV PÀÆqÀ¯Éà eÁjUÉ
§gÀĪÀAvÉ £ÉëĸÀ¯ÁVzÉ.
PR. 325
J£ï. UÉÆÃ¥Á®AiÀÄå
¸ÀPÁðgÀzÀ C¢üãÀ PÁAiÀÄðzÀ²ð,
£ÀUÀgÁ©üªÀÈ¢Þ E¯ÁSÉ (¸ÀªÀÄ£ÀéAiÀÄ).
£ÀUÀgÁ©üªÀÈ¢Þ ¸ÀaªÁ®AiÀÄ
C¢üPÀÈvÀ eÁÕ¥À£À
¸ÀASÉå: £ÀCE 39 ¸ÀªÀÄ£ÀéAiÀÄ 2014 ¨ÉAUÀ¼ÀÆgÀÄ, ¢£ÁAPÀ: 27-01-2014
«µÀAiÀÄ
:
£ÀUÀgÁ©üªÀÈ¢Þ E¯ÁSÉAiÀÄ mÉAqÀgï §Ä¯Én£ï£À°è ¥ÀæPÀn¸À®Ä C¥ÀgÀ PÁAiÀÄðzÀ²ð £ÀUÀgÁ©üªÀÈ¢Þ
E¯ÁSÉ EªÀgÀ£ÀÄß mÉAqÀgï §Ä¯Én£ï C¢üPÁjAiÀÄ£ÁßV £ÉëĸÀĪÀ §UÉÎ.
G¯ÉèÃR :
¸ÀPÁðgÀzÀ G¥À-PÁAiÀÄðzÀ²ð-1, £ÀUÀgÁ©üªÀÈ¢Þ E¯ÁSÉ EªÀgÀ n¥Ààt ¢£ÁAPÀ: 18-01-2014.
£ÀUÀgÁ©üªÀÈ¢Þ E¯ÁSÉAiÀÄ mÉAqÀgï £ÉÆÃn¦üPÉõÀ£ï ¥Àæ¸ÁÛªÀ£ÉUÀ¼À£ÀÄß mÉAqÀgï §Ä¯Én£ï£À°è ¥ÀæPÀn¸À®Ä mÉAqÀgï §Ä¯Én£ï
C¢üPÁjAiÀiÁVzÀÝ ¸ÀPÁðgÀzÀ G¥À-PÁAiÀÄðzÀ²ð-1, £ÀUÀgÁ©üªÀÈ¢Þ E¯ÁSÉ EªÀgÀ §zÀ¯ÁV ¸ÀPÁðgÀzÀ C¥ÀgÀ PÁAiÀÄðzÀ²ð, £ÀUÀgÁ©üªÀÈ¢Þ
E¯ÁSÉ EªÀgÀ£ÀÄß mÉAqÀgï §Ä¯Én£ï C¢üPÁjAiÀÄ£ÁßV PÀÆqÀ¯Éà eÁjUÉ §gÀĪÀAvÉ £ÉëĸÀ¯ÁVzÉ.
PR. 326
J£ï. UÉÆÃ¥Á®AiÀÄå
¸ÀPÁðgÀzÀ C¢üãÀ PÁAiÀÄðzÀ²ð,
£ÀUÀgÁ©üªÀÈ¢Þ E¯ÁSÉ (¸ÀªÀÄ£ÀéAiÀÄ).
AiÉÆÃd£É, PÁAiÀÄðPÀæªÀÄ ¸ÀAAiÉÆÃd£É ªÀÄvÀÄÛ ¸ÁATåPÀ ¸ÀaªÁ®AiÀÄ
«µÀAiÀÄ
:
PÀ£ÁðlPÀ ±Á¸ÀPÀgÀ ¸ÀܽÃAiÀÄ ¥ÀæzÉñÁ©üªÀÈ¢Þ AiÉÆÃd£É Cr 2013-14£Éà ¸Á°£À C£ÀÄzÁ£À
©qÀÄUÀqÉ ªÀiÁqÀĪÀ §UÉÎ.
NzÀ¯ÁVzÉ :
1. ¸ÀPÁðj DzÉñÀ ¸ÀASÉå: AiÉÆÃE 47 AiÉÆÃ«« 2013, ¢£ÁAPÀ: 11-07-2013.
2. ¸ÀPÁðj DzÉñÀ ¸ÀASÉå: AiÉÆÃE 36 AiÉÆÃ«« 2013, ¢£ÁAPÀ: 02-08-2013.
3. ¸ÀPÁðj DzÉñÀ ¸ÀASÉå: AiÉÆÃE 36 AiÉÆÃ«« 2013, ¢£ÁAPÀ: 19-09-2013.
4. ¸ÀPÁðj DzÉñÀ ¸ÀASÉå: AiÉÆÃE 36 AiÉÆÃ«« 2013, ¢£ÁAPÀ: 28-10-2013.
5. ¸ÀPÁðj DzÉñÀ ¸ÀASÉå: AiÉÆÃE 36 AiÉÆÃ«« 2013, ¢£ÁAPÀ: 09-01-2014.
¥Àæ¸ÁÛªÀ£É :
2013-14£Éà ¸Á°£À°è PÀ£ÁðlPÀ ±Á¸ÀPÀgÀ ¸ÀܽÃAiÀÄ ¥ÀæzÉñÁ©üªÀÈ¢Þ AiÉÆÃd£É Cr MlÄÖ gÀÆ.60150.00 ®PÀëUÀ¼À£ÀÄß MzÀV¸À¯ÁVzÀÄÝ,
F ¥ÉÊQ ªÉÄÃ¯É NzÀ¯ÁzÀ (1)gÀ ¸ÀPÁðj DzÉñÀzÀ°è 2012-13£Éà ¸Á°£À°è 8 f¯ÉèUÀ½UÉ ©qÀÄUÀqÉAiÀiÁUÀzÀ gÀÆ.1547.52 ®PÀëUÀ¼À£ÀÄß 2013-14£ÉÃ
¸Á°£À C£ÀÄzÁ£ÀzÀ°è ©qÀÄUÀqÉ ªÀiÁqÀ¯ÁVzÉ ºÁUÀÆ NzÀ¯ÁzÀ (2), (3), (4) ªÀÄvÀÄÛ (5)gÀ ¸ÀPÁðj DzÉñÀUÀ¼À°è PÀ£ÁðlPÀ ±Á¸ÀPÀgÀ ¸ÀܽÃAiÀÄ
¥ÀæzÉñÁ©üªÀÈ¢Þ AiÉÆÃd£ÉAiÀÄr 2013-14£Éà ¸Á°UÉ FªÀgÉUÉ vÀ¯Á gÀÆ.146.40 ®PÀëUÀ¼ÀAvÉ MlÄÖ gÀÆ.43430.56 ®PÀëUÀ¼À£ÀÄß ¸ÉÃj¹ FªÀgÉUÉ
MlÄÖ gÀÆ.44978.08 ®PÀëUÀ¼À£ÀÄß ©qÀÄUÀqÉ ªÀiÁqÀ¯ÁVzÉ.
2013-14£Éà ¸Á°£À CAwªÀÄ PÀAw£À C£ÀÄzÁ£ÀªÁV vÀ¯Á gÀÆ.50.00 ®PÀëUÀ¼ÀAvÉ gÀÆ.14850.00 ®PÀëUÀ¼À£ÀÄß ©qÀÄUÀqÉUÉÆ½¸À®Ä
¸ÀPÁðgÀªÀÅ GzÉÝò¹zÉ. CzÀgÀAvÉ F PɼÀPÀAqÀ DzÉñÀ.
¨sÁUÀ 1
PÀ£ÁðlPÀ gÁdå¥ÀvÀæ, UÀÄgÀĪÁgÀ, K¦æ¯ï 17, 2014
659
¸ÀPÁðj DzÉñÀ ¸ÀASÉå: AiÉÆÃE 36 AiÉÆÃ«« 2013, ¨ÉAUÀ¼ÀÆgÀÄ, ¢£ÁAPÀ: 04-03-2014.
PÀ£ÁðlPÀ
±Á¸ÀPÀgÀ
¸ÀܽÃAiÀÄ
¥ÀæzÉñÁ©üªÀÈ¢Þ
AiÉÆÃd£ÉAiÀÄr
2013-14£ÉÃ
¸Á°£À
CAwªÀÄ
PÀAw£À
C£ÀÄzÁ£ÀªÁV
C£ÀħAzsÀ-1gÀ°è ¸ÀÆa¹gÀĪÀ «zsÁ£À¸À¨sÁ PÉëÃvÀæUÀ½UÉ ªÀÄvÀÄÛ C£ÀħAzsÀ-2gÀ°è ¸ÀÆa¹gÀĪÀ «zsÁ£À ¥ÀjµÀvï ¸ÀzÀ¸ÀågÀÄUÀ¼À PÉëÃvÀæUÀ½UÉ vÀ¯Á
gÀÆ.50.00 ®PÀë (LªÀvÀÄÛ ®PÀë gÀÆ¥Á¬ÄUÀ¼ÀÄ ªÀiÁvÀæ)UÀ¼ÀAvÉ MlÄÖ gÀÆ.14850.00 ®PÀë (MAzÀÄ £ÀÆgÀ £À®ªÀvÉÛAlÄ PÉÆÃn LªÀvÀÄÛ ®PÀë
gÀÆ¥Á¬ÄUÀ¼ÀÄ ªÀiÁvÀæ) UÀ¼À£ÀÄß ¸ÀA§AzsÀ¥ÀlÖ f¯Áè¢üPÁjUÀ½UÉ F PɼÀPÀAqÀ ¯ÉPÀ̲öðPÉUÀ¼Àr ©qÀÄUÀqÉ ªÀiÁrzÉ.
(gÀÆ.®PÀëUÀ¼À°è)
PÀæ.¸ÀA.
¯ÉPÀÌ ²Ã¶ðPÉ (AiÉÆÃd£É)
FªÀgÉUÉ
©qÀÄUÀqÉUÉÆ½¹zÀ
C£ÀÄzÁ£À
¥Àæ¸ÀÄÛvÀ
©qÀÄUÀqÉUÉÆ½¸ÀÄwÛgÀĪÀ
C£ÀÄzÁ£À
MlÄÖ
©qÀÄUÀqÉUÉÆ½¹zÀ
C£ÀÄzÁ£À
1
2575-60-265-0-02-059
(EvÀgÉ ªÉZÀÑ)
133.69
- -
133.69
2
4575-60-800-0-01-132
(§AqÀªÁ¼À ªÉZÀÑ)
25902.94
8577.36
34480.30
3
4575-60-800-0-01-422
(«±ÉõÀ WÀlPÀ AiÉÆÃd£É)
13858.18
4588.65
18446.83
4
4575-60-800-0-01-423
(Vjd£À G¥ÀAiÉÆÃd£É)
5083.27
1683.99
6767.26
MlÄÖ
44978.08
14850.00
59828.08
©qÀÄUÀqÉAiÀiÁzÀ F C£ÀÄzÁ£ÀªÀ£ÀÄß f¯Áè¢üPÁjUÀ¼À ªÉÊAiÀÄQÛPÀ oÉêÀt SÁvÉAiÀİèlÄÖPÉÆAqÀÄ CUÀvÀåvÉUÉ C£ÀÄUÀÄtªÁV RZÀÄð
ªÀiÁqÀvÀPÀÌzÀÄÝ.
f¯Áè¢üPÁjUÀ¼ÀÄ DAiÀiÁ ±Á¸ÀPÀjAzÀ QæAiÀiÁ AiÉÆÃd£ÉAiÀÄ£ÀÄß ¥ÀqÉzÀÄ C¢üPÀÈvÀ eÁÕ¥À£À ¸ÀASÉå:AiÉÆÃE 39 AiÉÆÃ«« 2012 (¨sÁ),
¢£ÁAPÀ: 10-07-2012gÀ£ÀéAiÀÄ ªÀÄvÀÄÛ vÀzÀ£ÀAvÀgÀ ºÉÆgÀr¹zÀ ªÀiÁUÀð¸ÀÆaUÀ¼À£ÀéAiÀÄ C£ÀĵÁÖ£ÀUÉÆ½¸ÀvÀPÀÌzÀÄÝ.
PÁªÀÄUÁjUÀ¼À£ÀÄß C£ÀĵÁÖ£ÀUÉÆ½¸ÀĪÀ ªÀÄÄ£Àß ¥ÀjµÀÌøvÀ ªÀiÁUÀð¸ÀÆaAiÀÄ PÀArPÉ 3.15 gÀ£ÀéAiÀÄ CUÀvÀå PÀæªÀÄ PÉÊUÉÆ¼ÀîvÀPÀÌzÀÄÝ.
¤AiÀĪÀiÁ£ÀĸÁgÀ ºÀt §¼ÀPÉ ¥ÀæªÀiÁt ¥ÀvÀæªÀ£ÀÄß DAiÀiÁ f¯Áè¢üPÁjUÀ¼À ªÉÄÃ®Ä ¸À»AiÉÆA¢UÉ ¸ÀPÁðgÀPÉÌ ¸À°è¸ÀĪÀÅzÀÄ. ©qÀÄUÀqÉ
ªÀiÁrzÀ C£ÀÄzÁ£ÀªÀ£ÀÄß ¤UÀ¢vÀ CªÀ¢üAiÀÄ°è §¼ÀPÉ ªÀiÁrPÉÆ¼ÀîvÀPÀÌzÀÄÝ.
F DzÉñÀªÀ£ÀÄß DyðPÀ E¯ÁSÉAiÀÄ »A§gÀºÀ ¸ÀASÉå: DE 344/ªÉZÀÑ-06/2013, ¢£ÁAPÀ: 03-03-2014gÀ°è ¤ÃrgÀĪÀ
¸ÀºÀªÀÄwAiÀÄ ªÉÄÃgÉUÉ ºÉÆgÀr¸À¯ÁVzÉ.
PÀ£ÁðlPÀ gÁdå¥Á®gÀ DeÁÕ£ÀĸÁgÀ ªÀÄvÀÄÛ CªÀgÀ ºÉ¸Àj£À°è,
J¸ï.GªÀiÁªÀw,
¸ÀPÁðgÀzÀ C¢üãÀ PÁAiÀÄðzÀ²ð-1 & 2,
AiÉÆÃd£É, PÁAiÀÄðPÀæªÀÄ ¸ÀAAiÉÆÃd£É ªÀÄvÀÄÛ ¸ÁATåPÀ E¯ÁSÉ.
¸ÀPÁðj DzÉñÀ ¸ÀASÉå: AiÉÆÃE 36 AiÉÆÃ«« 2013, ¨ÉAUÀ¼ÀÆgÀÄ, ¢£ÁAPÀ: 04-03-2014gÀ C£ÀħAzsÀ-1
(gÀÆ.®PÀëUÀ¼À°è)
PÀæªÀÄ
¸ÀASÉå
«zsÁ£À¸À¨sÁ PÉëÃvÀæUÀ¼ÀÄ
¯ÉPÀÌ ²Ã¶ðPÉ 4575-60-800-0-01
MlÄÖ
132
422
423
1)
©ÃzÀgï f¯Éè «zsÁ£À¸À¨sÁ PÉëÃvÀæUÀ¼ÀÄ
1
©ÃzÀgï zÀQët
28.88
15.45
5.67
50.00
2
©ÃzÀgï GvÀÛgÀ
28.88
15.45
5.67
50.00
3
ºÀĪÀiÁߨÁzï
28.88
15.45
5.67
50.00
4
§¸ÀªÀPÀ¯Áåt
28.88
15.45
5.67
50.00
5
¨sÁ°Ì
28.88
15.45
5.67
50.00
6
OgÁzï
28.88
15.45
5.67
50.00
MlÄÖ
173.28
92.70
34.02
300.00
PÀ£ÁðlPÀ gÁdå¥ÀvÀæ, UÀÄgÀĪÁgÀ, K¦æ¯ï 17, 2014
¨sÁUÀ 1
660
(gÀÆ.®PÀëUÀ¼À°è)
PÀæªÀÄ
¸ÀASÉå
«zsÁ£À¸À¨sÁ PÉëÃvÀæUÀ¼ÀÄ
¯ÉPÀÌ ²Ã¶ðPÉ 4575-60-800-0-01
MlÄÖ
132
422
423
2)
§¼Áîj f¯Éè «zsÁ£À¸À¨sÁ PÉëÃvÀæUÀ¼ÀÄ
1
¹gÀUÀÄ¥Àà
28.88
15.45
5.67
50.00
2
§¼Áîj £ÀUÀgÀ
28.88
15.45
5.67
50.00
3
§¼Áîj («ÄÃ)
28.88
15.45
5.67
50.00
4
«dAiÀÄ£ÀUÀgÀ
28.88
15.45
5.67
50.00
5
¸ÀAqÀÆgÀÄ («ÄÃ)
28.88
15.45
5.67
50.00
6
PÀÆqÀèV («ÄÃ)
28.88
15.45
5.67
50.00
7
PÀA¦è («ÄÃ)
28.88
15.45
5.67
50.00
8
ºÀÆ«£À ºÀqÀUÀ° («ÄÃ)
28.88
15.45
5.67
50.00
9
ºÀUÀj¨ÉƪÀÄä£ÀºÀ½î («ÄÃ)
28.88
15.45
5.67
50.00
MlÄÖ
259.92
139.05
51.03
450.00
3)
avÀæzÀÄUÀð f¯Éè «zsÁ£À¸À¨sÁ PÉëÃvÀæUÀ¼ÀÄ
1
avÀæzÀÄUÀð
28.88
15.45
5.67
50.00
2
ªÉƼÀPÁ®ÆägÀÄ
28.88
15.45
5.67
50.00
3
ZÀ¼ÀîPÉgÉ
28.88
15.45
5.67
50.00
4
»jAiÀÄÆgÀÄ
28.88
15.45
5.67
50.00
5
ºÉƼÀ¯ÉÌgÉ
28.88
15.45
5.67
50.00
6
ºÉƸÀzÀÄUÀð
28.88
15.45
5.67
50.00
MlÄÖ
173.28
92.70
34.02
300.00
4)
zÁªÀtUÉgÉ f¯Éè «zsÁ£À¸À¨sÁ PÉëÃvÀæUÀ¼ÀÄ
1
ºÀgÀ¥À£ÀºÀ½î
28.88
15.45
5.67
50.00
2
ºÀjºÀgÀ
28.88
15.45
5.67
50.00
3
zÁªÀtUÉgÉ zÀQët
28.88
15.45
5.67
50.00
4
zÁªÀtUÉgÉ GvÀÛgÀ
28.88
15.45
5.67
50.00
5
ªÀiÁAiÀÄPÉÆAqÀ
28.88
15.45
5.67
50.00
6
dUÀ¼ÀÆgÀÄ
28.88
15.45
5.67
50.00
7
ZÉ£ÀßVj
28.88
15.45
5.67
50.00
8
ºÉÆ£Áß½
28.88
15.45
5.67
50.00
MlÄÖ
231.04
123.60
45.36
400.00
5)
UÀÄ®âUÀð f¯Éè «zsÁ£À¸À¨sÁ PÉëÃvÀæUÀ¼ÀÄ
1
aAZÉÆÃ½ («ÄÃ)
28.88
15.45
5.67
50.00
2
UÀÄ®âUÀð zÀQët
28.88
15.45
5.67
50.00
3
D¼ÀAzÀ
28.88
15.45
5.67
50.00
4
UÀÄ®âUÀð GvÀÛgÀ
28.88
15.45
5.67
50.00
5
UÀÄ®âUÀð UÁæ«ÄÃt («ÄÃ)
28.88
15.45
5.67
50.00
¨sÁUÀ 1
PÀ£ÁðlPÀ gÁdå¥ÀvÀæ, UÀÄgÀĪÁgÀ, K¦æ¯ï 17, 2014
661
(gÀÆ.®PÀëUÀ¼À°è)
PÀæªÀÄ
¸ÀASÉå
«zsÁ£À¸À¨sÁ PÉëÃvÀæUÀ¼ÀÄ
¯ÉPÀÌ ²Ã¶ðPÉ 4575-60-800-0-01
MlÄÖ
132
422
423
6
C¥sÀd¯ï ¥ÀÄgÀ
28.88
15.45
5.67
50.00
7
¸ÉÃqÀA
28.88
15.45
5.67
50.00
8
eÉêÀVð
28.88
15.45
5.67
50.00
9
avÁÛ¥ÀÄgÀ
28.88
15.45
5.67
50.00
MlÄÖ
259.92
139.05
51.03
450.00
6)
AiÀiÁzÀVgï f¯Éè «zsÁ£À¸À¨sÁ PÉëÃvÀæUÀ¼ÀÄ
1
AiÀiÁzÀVgï
28.88
15.45
5.67
50.00
2
±ÀºÁ¥ÀÄgÀ
28.88
15.45
5.67
50.00
3
¸ÀÄgÀ¥ÀÄgÀ («ÄÃ)
28.88
15.45
5.67
50.00
4
UÀÄgÀÄ«Äl̯ï
28.88
15.45
5.67
50.00
MlÄÖ
115.52
61.80
22.68
200.00
7)
gÁAiÀÄZÀÆgÀÄ f¯Éè «zsÁ£À¸À¨sÁ PÉëÃvÀæUÀ¼ÀÄ
1
zÉêÀzÀÄUÀð («ÄÃ)
28.88
15.45
5.67
50.00
2
gÁAiÀÄZÀÆgÀÄ
28.88
15.45
5.67
50.00
3
gÁAiÀÄZÀÆgÀÄ UÁæ«ÄÃt («ÄÃ)
28.88
15.45
5.67
50.00
4
ªÀiÁ¤é («ÄÃ)
28.88
15.45
5.67
50.00
5
°AUÀ¸ÀÄUÀÆgÀÄ («ÄÃ)
28.88
15.45
5.67
50.00
6
¹AzsÀ£ÀÆgÀÄ
28.88
15.45
5.67
50.00
7
ªÀÄ¹Ì («ÄÃ)
28.88
15.45
5.67
50.00
MlÄÖ
202.16
108.15
39.69
350.00
8)
PÉÆ¥Àà¼À f¯Éè «zsÁ£À¸À¨sÁ PÉëÃvÀæUÀ¼ÀÄ
1
PÀĵÀÖV
28.88
15.45
5.67
50.00
2
AiÀÄ®§ÄUÀð
28.88
15.45
5.67
50.00
3
PÀ£ÀPÀVj («ÄÃ)
28.88
15.45
5.67
50.00
4
UÀAUÁªÀw
28.88
15.45
5.67
50.00
5
PÉÆ¥Àà¼À
28.88
15.45
5.67
50.00
MlÄÖ
140.00
77.25
28.35
250.00
9)
PÉÆÃ¯ÁgÀ f¯Éè «zsÁ£À¸À¨sÁ PÉëÃvÀæUÀ¼ÀÄ
1
²æÃ¤ªÁ¸À¥ÀÄgÀ
28.88
15.45
5.67
50.00
2
ªÀÄļÀĨÁV®Ä
28.88
15.45
5.67
50.00
3
PÉ.f.J¥sï
28.88
15.45
5.67
50.00
4
PÉÆÃ¯ÁgÀ
28.88
15.45
5.67
50.00
5
§AUÁgÀÄ¥ÉÃmÉ
28.88
15.45
5.67
50.00
6
ªÀiÁ®ÆgÀÄ
28.88
15.45
5.67
50.00
MlÄÖ
173.28
92.70
34.02
300.00
PÀ£ÁðlPÀ gÁdå¥ÀvÀæ, UÀÄgÀĪÁgÀ, K¦æ¯ï 17, 2014
¨sÁUÀ 1
662
(gÀÆ.®PÀëUÀ¼À°è)
PÀæªÀÄ
¸ÀASÉå
«zsÁ£À¸À¨sÁ PÉëÃvÀæUÀ¼ÀÄ
¯ÉPÀÌ ²Ã¶ðPÉ 4575-60-800-0-01
MlÄÖ
132
422
423
10)
aPÀ̧¼Áî¥ÀÄgÀ f¯Éè «zsÁ£À¸À¨sÁ PÉëÃvÀæUÀ¼ÀÄ
1
aPÀ̧¼Áî¥ÀÄgÀ
28.88
15.45
5.67
50.00
2
aAvÁªÀÄtÂ
28.88
15.45
5.67
50.00
3
²qÀèWÀlÖ
28.88
15.45
5.67
50.00
4
¨ÁUÉÃ¥À°è
28.88
15.45
5.67
50.00
5
UËj©zÀ£ÀÆgÀÄ
28.88
15.45
5.67
50.00
MlÄÖ
144.40
77.25
28.35
250.00
11)
vÀĪÀÄPÀÆgÀÄ f¯Éè «zsÁ£À¸À¨sÁ PÉëÃvÀæUÀ¼ÀÄ
1
¥ÁªÀUÀqÀ
28.88
15.45
5.67
50.00
2
²gÁ
28.88
15.45
5.67
50.00
3
vÀĪÀÄPÀÆgÀÄ UÁæªÀiÁAvÀgÀ
28.88
15.45
5.67
50.00
4
ªÀÄzsÀÄVj
28.88
15.45
5.67
50.00
5
PÉÆgÀlUÉgÉ («ÄÃ)
28.88
15.45
5.67
50.00
6
vÀĪÀÄPÀÆgÀÄ £ÀUÀgÀ
28.88
15.45
5.67
50.00
7
PÀÄtÂUÀ¯ï
28.88
15.45
5.67
50.00
8
UÀÄ©â
28.88
15.45
5.67
50.00
9
vÀÄgÀĪÉÃPÉgÉ
28.88
15.45
5.67
50.00
10
w¥ÀlÆgÀÄ
28.88
15.45
5.67
50.00
11
aPÀÌ£ÁAiÀÄPÀ£À ºÀ½î
28.88
15.45
5.67
50.00
MlÄÖ
317.68
169.95
62.37
550.00
12)
gÁªÀÄ£ÀUÀgÀ f¯Éè «zsÁ£À¸À¨sÁ PÉëÃvÀæUÀ¼ÀÄ
1
PÀ£ÀPÀ¥ÀÄgÀ
28.88
15.45
5.67
50.00
2
ªÀiÁUÀr
28.88
15.45
5.67
50.00
3
gÁªÀÄ£ÀUÀgÀ
28.88
15.45
5.67
50.00
4
ZÀ£ÀߥÀlÖt
28.88
15.45
5.67
50.00
MlÄÖ
115.52
61.80
22.68
200.00
13)
¨ÉAUÀ¼ÀÆgÀÄ £ÀUÀgÀ f¯Éè «zsÁ£À¸À¨sÁ
PÉëÃvÀæUÀ¼ÀÄ
1
ªÀįÉèñÀégÀA
28.88
15.45
5.67
50.00
2
gÁeÁf£ÀUÀgÀ
28.88
15.45
5.67
50.00
3
UÁA¢üãÀUÀgÀ
28.88
15.45
5.67
50.00
4
aPÀÌ¥ÉÃmÉ
28.88
15.45
5.67
50.00
5
zÁ¸ÀgÀºÀ½î
28.88
15.45
5.67
50.00
6
ZÁªÀÄgÁd¥ÉÃmÉ
28.88
15.45
5.67
50.00
7
§¸ÀªÀ£ÀUÀÄr
28.88
15.45
5.67
50.00
¨sÁUÀ 1
PÀ£ÁðlPÀ gÁdå¥ÀvÀæ, UÀÄgÀĪÁgÀ, K¦æ¯ï 17, 2014
663
(gÀÆ.®PÀëUÀ¼À°è)
PÀæªÀÄ
¸ÀASÉå
«zsÁ£À¸À¨sÁ PÉëÃvÀæUÀ¼ÀÄ
¯ÉPÀÌ ²Ã¶ðPÉ 4575-60-800-0-01
MlÄÖ
132
422
423
8
dAiÀÄ£ÀUÀgÀ
28.88
15.45
5.67
50.00
9
ªÀĺÁ®Qëöäà ¯ÉÃOmï
28.88
15.45
5.67
50.00
10
ºÉ¨Áâ¼À
28.88
15.45
5.67
50.00
11
¥ÀİPÉò £ÀUÀgÀ («ÄÃ)
28.88
15.45
5.67
50.00
12
AiÀÄ®ºÀAPÀ
28.88
15.45
5.67
50.00
13
«dAiÀÄ £ÀUÀgÀ
28.88
15.45
5.67
50.00
14
¥ÀzÀä£Á¨sÀ£ÀUÀgÀ
28.88
15.45
5.67
50.00
15
C£ÉÃPÀ¯ï («ÄÃ)
28.88
15.45
5.67
50.00
16
¨ÉAUÀ¼ÀÆgÀÄ zÀQët
28.88
15.45
5.67
50.00
17
PÉ.Dgï.¥ÀÄgÀA
28.88
15.45
5.67
50.00
18
¨ÉƪÀÄä£ÀºÀ½î
28.88
15.45
5.67
50.00
19
¨ÁålgÁAiÀÄ£À¥ÀÄgÀ
28.88
15.45
5.67
50.00
20
AiÀıÀªÀAvÀ¥ÀÄgÀ
28.88
15.45
5.67
50.00
21
gÁdgÁeÉñÀéj £ÀUÀgÀ
28.88
15.45
5.67
50.00
22
©.n.JA. ¯ÉÃOmï
28.88
15.45
5.67
50.00
23
ªÀĺÀzÉêÀ¥ÀÄgÀ («ÄÃ)
28.88
15.45
5.67
50.00
24
¸ÀªÀðdÕ £ÀUÀgÀ
28.88
15.45
5.67
50.00
25
±ÁAw£ÀUÀgÀ
28.88
15.45
5.67
50.00
26
¹.«.gÁªÀÄ£ï£ÀUÀgÀ («ÄÃ)
28.88
15.45
5.67
50.00
27
²ªÁf£ÀUÀgÀ
28.88
15.45
5.67
50.00
28
UÉÆÃ«AzÀgÁd£ÀUÀgÀ
28.88
15.45
5.67
50.00
MlÄÖ
808.64
432.60
158.76
1400.00
14)
¨ÉAUÀ¼ÀÆgÀÄ
UÁæªÀiÁAvÀgÀ
f¯Éè
«zsÁ£À¸À¨sÁ PÉëÃvÀæUÀ¼ÀÄ
1
£É®ªÀÄAUÀ®
28.88
15.45
5.67
50.00
2
zÉÆqÀا¼Áî¥ÀÄgÀ
28.88
15.45
5.67
50.00
3
zÉêÀ£ÀºÀ½î
28.88
15.45
5.67
50.00
4
ºÉƸÀPÉÆÃmÉ
28.88
15.45
5.67
50.00
MlÄÖ
115.52
61.80
22.68
200.00
15)
ªÉÄʸÀÆgÀ f¯Éè «zsÁ£À¸À¨sÁ PÉëÃvÀæUÀ¼ÀÄ
1
n.£ÀgÀ¹Ã¥ÀÄgÀ («ÄÃ)
28.88
15.45
5.67
50.00
2
PÀȵÀgÁd
28.88
15.45
5.67
50.00
3
ZÁªÀÄgÁd
28.88
15.45
5.67
50.00
4
£ÀgÀ¹AºÀgÁd
28.88
15.45
5.67
50.00
5
ZÁªÀÄÄAqÉñÀéj
28.88
15.45
5.67
50.00
PÀ£ÁðlPÀ gÁdå¥ÀvÀæ, UÀÄgÀĪÁgÀ, K¦æ¯ï 17, 2014
¨sÁUÀ 1
664
(gÀÆ.®PÀëUÀ¼À°è)
PÀæªÀÄ
¸ÀASÉå
«zsÁ£À¸À¨sÁ PÉëÃvÀæUÀ¼ÀÄ
¯ÉPÀÌ ²Ã¶ðPÉ 4575-60-800-0-01
MlÄÖ
132
422
423
6
£ÀAd£ÀUÀÆqÀÄ («ÄÃ)
28.88
15.45
5.67
50.00
7
ºÉZï.r.PÉÆÃmÉ («ÄÃ)
28.88
15.45
5.67
50.00
8
ºÀÄt¸ÀÆgÀÄ
28.88
15.45
5.67
50.00
9
ªÀgÀÄt
28.88
15.45
5.67
50.00
10
PÀȵÀÚgÁd£ÀUÀgÀ
28.88
15.45
5.67
50.00
11
¦jAiÀiÁ¥ÀlÖt
28.88
15.45
5.67
50.00
MlÄÖ
317.68
169.95
62.37
550.00
16)
ªÀÄAqÀå f¯ÉèAiÀÄ «zsÁ£À¸À¨sÁ PÉëÃvÀæUÀ¼ÀÄ
1
£ÁUÀªÀÄAUÀ®
28.88
15.45
5.67
50.00
2
ªÀÄzÀÆÝgÀÄ
28.88
15.45
5.67
50.00
3
ªÉÄîÄPÉÆÃmÉ
28.88
15.45
5.67
50.00
4
ªÀļÀªÀ½î («ÄÃ)
28.88
15.45
5.67
50.00
5
ªÀÄAqÀå
28.88
15.45
5.67
50.00
6
PÉ.Dgï.¥ÉÃmÉ
28.88
15.45
5.67
50.00
7
²æÃgÀAUÀ¥ÀlÖt
28.88
15.45
5.67
50.00
MlÄÖ
202.16
108.15
39.69
350.00
17)
ZÁªÀÄgÁd£ÀUÀgÀ f¯ÉèAiÀÄ «zsÁ£À¸À¨sÁ
PÉëÃvÀæUÀ¼ÀÄ
1
ºÀ£ÀÆgÀÄ
28.88
15.45
5.67
50.00
2
PÉÆ¼ÉîÃUÁ®
28.88
15.45
5.67
50.00
3
ZÁªÀÄgÁd£ÀUÀgÀ
28.88
15.45
5.67
50.00
4
UÀÄAqÀÄè¥ÉÃmÉ
28.88
15.45
5.67
50.00
MlÄÖ
115.52
61.80
22.68
200.00
18)
PÉÆqÀUÀÄ f¯ÉèAiÀÄ «zsÁ£À¸À¨sÁ PÉëÃvÀæUÀ¼ÀÄ
1
«gÁd¥ÉÃmÉ
28.88
15.45
5.67
50.00
2
ªÀÄrPÉÃj
28.88
15.45
5.67
50.00
MlÄÖ
57.76
30.90
11.34
100.00
19)
zÀQët
PÀ£ÀßqÀ
f¯ÉèAiÀÄ
«zsÁ£À¸À¨sÁ
PÉëÃvÀæUÀ¼ÀÄ
1
¸ÀļÀå
28.88
15.45
5.67
50.00
2
¥ÀÄvÀÆÛgÀÄ
28.88
15.45
5.67
50.00
3
¨É¼ÀÛAUÀr
28.88
15.45
5.67
50.00
4
§AmÁé¼À
28.88
15.45
5.67
50.00
5
ªÀÄAUÀ¼ÀÆgÀÄ
28.88
15.45
5.67
50.00
6
ªÀÄAUÀ¼ÀÆgÀÄ £ÀUÀgÀ
28.88
15.45
5.67
50.00
¨sÁUÀ 1
PÀ£ÁðlPÀ gÁdå¥ÀvÀæ, UÀÄgÀĪÁgÀ, K¦æ¯ï 17, 2014
665
(gÀÆ.®PÀëUÀ¼À°è)
PÀæªÀÄ
¸ÀASÉå
«zsÁ£À¸À¨sÁ PÉëÃvÀæUÀ¼ÀÄ
¯ÉPÀÌ ²Ã¶ðPÉ 4575-60-800-0-01
MlÄÖ
132
422
423
7
ªÀÄAUÀ¼ÀÆgÀÄ zÀQët
28.88
15.45
5.67
50.00
8
ªÀÄÆqÀ©¢æ
28.88
15.45
5.67
50.00
MlÄÖ
231.04
123.60
45.36
400.00
20)
GqÀĦ f¯ÉèAiÀÄ «zsÁ£À¸À¨sÁ PÉëÃvÀæUÀ¼ÀÄ
1
PÁ¥ÀÄ
28.88
15.45
5.67
50.00
2
GqÀĦ
28.88
15.45
5.67
50.00
3
PÀÄAzÁ¥ÀÄgÀ
28.88
15.45
5.67
50.00
4
¨ÉÊAzÀÆgÀÄ
28.88
15.45
5.67
50.00
5
PÁPÀð¼À
28.88
15.45
5.67
50.00
MlÄÖ
144.40
77.25
28.35
250.00
21)
²ªÀªÉÆUÀÎ f¯ÉèAiÀÄ «zsÁ£À¸À¨sÁ PÉëÃvÀæUÀ¼ÀÄ
1
²ªÀªÉÆUÀÎ UÁæªÀiÁAvÀgÀ
28.88
15.45
5.67
50.00
2
¨sÀzÁæªÀw
28.88
15.45
5.67
50.00
3
²ªÀªÉÆUÀÎ
28.88
15.45
5.67
50.00
4
wÃxÀðºÀ½î
28.88
15.45
5.67
50.00
5
¸ÁUÀgÀ
28.88
15.45
5.67
50.00
6
¸ÉÆgÀ§
28.88
15.45
5.67
50.00
7
²PÁj¥ÀÄgÀ
28.88
15.45
5.67
50.00
MlÄÖ
202.16
108.15
39.69
350.00
22)
zsÁgÀªÁqÀ f¯ÉèAiÀÄ «zsÁ£À¸À¨sÁ PÉëÃvÀæUÀ¼ÀÄ
1
zsÁgÀªÁqÀ
28.88
15.45
5.67
50.00
2
ºÀħâ½î-zsÁgÀªÁqÀ (¥À²ÑªÀÄ)
28.88
15.45
5.67
50.00
3
ºÀħâ½î-zsÁgÀªÁqÀ (¥ÀƪÀð) («ÄÃ)
28.88
15.45
5.67
50.00
4
ºÀħâ½î-zsÁgÀªÁqÀ PÉÃAzÀæ
28.88
15.45
5.67
50.00
5
PÀ®WÀlV
28.88
15.45
5.67
50.00
6
PÀÄAzÀUÉÆÃ¼À
28.88
15.45
5.67
50.00
7
£ÀªÀ®UÀÄAzÀ
28.88
15.45
5.67
50.00
MlÄÖ
202.16
108.15
39.69
350.00
23)
ºÁªÉÃj f¯Éè «zsÁ£À¸À¨sÁ PÉëÃvÀæUÀ¼ÀÄ
1
²UÁÎAªï
28.88
15.45
5.67
50.00
2
ºÁ£ÀUÀ¯ï
28.88
15.45
5.67
50.00
3
»gÉÃPÉgÀÆgÀÄ
28.88
15.45
5.67
50.00
4
gÁt¨ɣÀÆßgÀÄ
28.88
15.45
5.67
50.00
PÀ£ÁðlPÀ gÁdå¥ÀvÀæ, UÀÄgÀĪÁgÀ, K¦æ¯ï 17, 2014
¨sÁUÀ 1
666
(gÀÆ.®PÀëUÀ¼À°è)
PÀæªÀÄ
¸ÀASÉå
«zsÁ£À¸À¨sÁ PÉëÃvÀæUÀ¼ÀÄ
¯ÉPÀÌ ²Ã¶ðPÉ 4575-60-800-0-01
MlÄÖ
132
422
423
5
ºÁªÉÃj
28.88
15.45
5.67
50.00
6
¨ÁåqÀV
28.88
15.45
5.67
50.00
MlÄÖ
173.28
92.70
34.02
300.00
24)
©eÁ¥ÀÄgÀ f¯ÉèAiÀÄ «zsÁ£À¸À¨sÁ PÉëÃvÀæUÀ¼ÀÄ
1
ªÀÄÄzÉÝéºÁ¼À
28.88
15.45
5.67
50.00
2
zÉêÀgÀ»¥ÀàgÀV
28.88
15.45
5.67
50.00
3
§¸ÀªÀ£À ¨ÁUÉêÁr
28.88
15.45
5.67
50.00
4
£ÁUÀoÁt («ÄÃ)
28.88
15.45
5.67
50.00
5
©eÁ¥ÀÄgÀ £ÀUÀgÀ
28.88
15.45
5.67
50.00
6
§§¯ÉñÀégÀ
28.88
15.45
5.67
50.00
7
EAr
28.88
15.45
5.67
50.00
8
¹AzÀV
28.88
15.45
5.67
50.00
MlÄÖ
231.04
123.60
45.36
400.00
25)
¨ÁUÀ®PÉÆÃmÉ
f¯ÉèAiÀÄ
«zsÁ£À¸À¨sÁ
PÉëÃvÀæUÀ¼ÀÄ
1
dªÀÄRAr
28.88
15.45
5.67
50.00
2
©Ã¼ÀV
28.88
15.45
5.67
50.00
3
ªÀÄÄzsÉÆÃ¼À
28.88
15.45
5.67
50.00
4
¨ÁUÀ®PÉÆÃmÉ
28.88
15.45
5.67
50.00
5
¨ÁzÁ«Ä
28.88
15.45
5.67
50.00
6
vÉÃgÀzÁ¼À
28.88
15.45
5.67
50.00
7
ºÀÄ£ÀUÀÄAzÀ
28.88
15.45
5.67
50.00
MlÄÖ
202.16
108.15
39.69
350.00
26)
aPÀ̪ÀÄUÀ¼ÀÆgÀÄ
f¯ÉèAiÀÄ
«zsÁ£À¸À¨sÁ
PÉëÃvÀæUÀ¼ÀÄ
1
aPÀ̪ÀÄUÀ¼ÀÆgÀÄ
28.88
15.45
5.67
50.00
2
PÀqÀÆgÀÄ
28.88
15.45
5.67
50.00
3
ªÀÄÆrUÉgÉ
28.88
15.45
5.67
50.00
4
±ÀÈAUÉÃj
28.88
15.45
5.67
50.00
5
vÀjÃPÉgÉ
28.88
15.45
5.67
50.00
MlÄÖ
144.40
77.25
28.35
250.00
27)
GvÀÛgÀ
PÀ£ÀßqÀ
f¯ÉèAiÀÄ
«zsÁ£À¸À¨sÁ
PÉëÃvÀæUÀ¼ÀÄ
1
²gÀ¹
28.88
15.45
5.67
50.00
2
¨sÀl̼ï
28.88
15.45
5.67
50.00
¨sÁUÀ 1
PÀ£ÁðlPÀ gÁdå¥ÀvÀæ, UÀÄgÀĪÁgÀ, K¦æ¯ï 17, 2014
667
(gÀÆ.®PÀëUÀ¼À°è)
PÀæªÀÄ
¸ÀASÉå
«zsÁ£À¸À¨sÁ PÉëÃvÀæUÀ¼ÀÄ
¯ÉPÀÌ ²Ã¶ðPÉ 4575-60-800-0-01
MlÄÖ
132
422
423
3
PÀĪÀÄÄmÁ
28.88
15.45
5.67
50.00
4
AiÀįÁè¥ÀÄgÀ
28.88
15.45
5.67
50.00
5
ºÀ½AiÀiÁ¼À
28.88
15.45
5.67
50.00
6
PÁgÀªÁgÀ
28.88
15.45
5.67
50.00
MlÄÖ
173.28
92.70
34.02
300.00
28)
UÀzÀUÀ f¯ÉèAiÀÄ «zsÁ£À¸À¨sÁ PÉëÃvÀæUÀ¼ÀÄ
1
²gÀºÀnÖ
28.88
15.45
5.67
50.00
2
UÀzÀUÀ
28.88
15.45
5.67
50.00
3
gÉÆÃt
28.88
15.45
5.67
50.00
4
£ÀgÀUÀÄAzÀ
28.88
15.45
5.67
50.00
MlÄÖ
115.52
61.80
22.68
200.00
29)
¨É¼ÀUÁA f¯ÉèAiÀÄ «zsÁ£À¸À¨sÁ PÉëÃvÀæUÀ¼ÀÄ
1
¨É¼ÀUÁA GvÀÛgÀ
28.88
15.45
5.67
50.00
2
¨É¼ÀUÁA zÀQët
28.88
15.45
5.67
50.00
3
¨É¼ÀUÁA UÁæªÀiÁAvÀgÀ
28.88
15.45
5.67
50.00
4
PÀÄqÀa
28.88
15.45
5.67
50.00
5
AiÀĪÀÄPÀ£ÀªÀÄgÀr
28.88
15.45
5.67
50.00
6
aPÉÆÌÃr-¸ÀzÀ®UÀ
28.88
15.45
5.67
50.00
7
gÁAiÀĨsÁUÀ
28.88
15.45
5.67
50.00
8
PÁUÀªÁqÀ
28.88
15.45
5.67
50.00
9
CxÀtÂ
28.88
15.45
5.67
50.00
10
UÉÆÃPÁPï
28.88
15.45
5.67
50.00
11
CgÀ¨Á«
28.88
15.45
5.67
50.00
12
ºÀÄPÉÌÃj
28.88
15.45
5.67
50.00
13
QvÀÆÛgÀÄ
28.88
15.45
5.67
50.00
14
¤¥ÁàtÂ
28.88
15.45
5.67
50.00
15
SÁ£Á¥ÀÄgÀ
28.88
15.45
5.67
50.00
16
¨ÉÊ®ºÉÆAUÀ®
28.88
15.45
5.67
50.00
17
¸ÀªÀzÀwÛ J®èªÀÄä
28.88
15.45
5.67
50.00
18
gÁªÀÄzÀÄUÀð
28.88
15.45
5.67
50.00
MlÄÖ
519.84
278.10
102.06
900.00
30)
ºÁ¸À£À f¯ÉèAiÀÄ «zsÁ£À¸À¨sÁ PÉëÃvÀæUÀ¼ÀÄ
1
¨ÉîÆgÀÄ
28.88
15.45
5.67
50.00
2
CgÀ¹ÃPÉgÉ
28.88
15.45
5.67
50.00
PÀ£ÁðlPÀ gÁdå¥ÀvÀæ, UÀÄgÀĪÁgÀ, K¦æ¯ï 17, 2014
¨sÁUÀ 1
668
(gÀÆ.®PÀëUÀ¼À°è)
PÀæªÀÄ
¸ÀASÉå
«zsÁ£À¸À¨sÁ PÉëÃvÀæUÀ¼ÀÄ
¯ÉPÀÌ ²Ã¶ðPÉ 4575-60-800-0-01
MlÄÖ
132
422
423
3
±ÀæªÀt¨É¼ÀUÉÆ¼À
28.88
15.45
5.67
50.00
4
ºÉƼɣÀgÀ¹¥ÀÄgÀ
28.88
15.45
5.67
50.00
5
CgÀPÀ®UÀÆqÀÄ
28.88
15.45
5.67
50.00
6
ºÁ¸À£À
28.88
15.45
5.67
50.00
7
¸ÀPÀ¯ÉñÀ¥ÀÄgÀ
28.88
15.45
5.67
50.00
MlÄÖ
202.16
108.15
39.69
350.00
MlÄÖ ªÉÆvÀÛ
6469.12
3460.80
1270.08
11200.00
J¸ï.GªÀiÁªÀw,
¸ÀPÁðgÀzÀ C¢üãÀ PÁAiÀÄðzÀ²ð-1 & 2,
AiÉÆÃd£É, PÁAiÀÄðPÀæªÀÄ ¸ÀAAiÉÆÃd£É ªÀÄvÀÄÛ ¸ÁATåPÀ E¯ÁSÉ.
¸ÀPÁðj DzÉñÀ ¸ÀASÉå: AiÉÆÃE 36 AiÉÆÃ«« 2013, ¨ÉAUÀ¼ÀÆgÀÄ, ¢£ÁAPÀ: 04-03-2014gÀ C£ÀħAzsÀ-2
(gÀÆ.®PÀëUÀ¼À°è)
PÀæªÀÄ
¸ÀASÉå
«zsÁ£À¥ÀjµÀvï ¸ÀzÀ¸ÀågÀ ºÉ¸ÀgÀÄUÀ¼ÀÄ
(²æÃ/²æÃªÀÄw)
¯ÉPÀÌ ²Ã¶ðPÉ 4575-60-800-0-01
MlÄÖ
132
422
423
1) ©ÃzÀgï f¯Éè
1
§¸ÀªÀgÁeï ºÉZï ¥Ánïï
28.88
15.45
5.67
50.00
2
gÀWÀÄ£ÁxÀgÁªï ªÀiÁ®PÀ¥ÀÄgÉ
28.88
15.45
5.67
50.00
MlÄÖ
57.76
30.90
11.34
100.00
2) §¼Áîj f¯Éè
1
ªÀÄÈvÀÄåAdAiÀÄ f£ÀUÁ
28.88
15.45
5.67
50.00
MlÄÖ
28.88
15.45
5.67
50.00
3) avÀðzÀÄUÀð f¯Éè
1
f.gÀWÀÄ DZÁgï
28.88
15.45
5.67
50.00
MlÄÖ
28.88
15.45
5.67
50.00
4) zÁªÀtUÉgÉ f¯Éè
1
qÁ|| J.ºÉZï.²ªÀAiÉÆÃV¸Áé«Ä
28.88
15.45
5.67
50.00
MlÄÖ
28.88
15.45
5.67
50.00
5) UÀÄ®âUÁð f¯Éè
1
C®èªÀÄ ¥Àæ¨sÀÄ ¥Ánïï
28.88
15.45
5.67
50.00
2
PÉ.©.±Át¥Àà
28.88
15.45
5.67
50.00
3
CªÀÄgÀ£ÁxÀ ¥Ánïï
28.88
15.45
5.67
50.00
MlÄÖ
86.64
46.35
17.01
150.00
¨sÁUÀ 1
PÀ£ÁðlPÀ gÁdå¥ÀvÀæ, UÀÄgÀĪÁgÀ, K¦æ¯ï 17, 2014
669
(gÀÆ.®PÀëUÀ¼À°è)
PÀæªÀÄ
¸ÀASÉå
«zsÁ£À¥ÀjµÀvï ¸ÀzÀ¸ÀågÀ ºÉ¸ÀgÀÄUÀ¼ÀÄ
(²æÃ/²æÃªÀÄw)
¯ÉPÀÌ ²Ã¶ðPÉ 4575-60-800-0-01
MlÄÖ
132
422
423
6) PÉÆ¥Àà¼À f¯Éè
1
DZÁgï ºÁ®¥Àà §¸À¥Àà
28.88
15.45
5.67
50.00
MlÄÖ
28.88
15.45
5.67
50.00
7) PÉÆÃ¯ÁgÀ f¯Éè
1
£À¹Ãgï CºÀªÀÄzï
28.88
15.45
5.67
50.00
2
ªÉÊ.J.£ÁgÁAiÀÄt¸Áé«Ä
28.88
15.45
5.67
50.00
MlÄÖ
57.76
30.90
11.34
100.00
8) vÀĪÀÄPÀÆgÀÄ f¯Éè
1
dUÉÎñï
28.88
15.45
5.67
50.00
2
JA.r.®QëöäãÁgÁAiÀÄt
28.88
15.45
5.67
50.00
3
JA.Dgï.ºÀİ£ÁAiÀÄÌgï
28.88
15.45
5.67
50.00
MlÄÖ
86.64
46.35
17.01
150.00
9) gÁªÀÄ£ÀUÀgÀ f¯Éè
1
JA.«.gÁd±ÉÃRgÀ£ï
28.88
15.45
5.67
50.00
2
¸ÉÊAiÀÄzï ªÀÄÄ¢üÃgï DUÁ
28.88
15.45
5.67
50.00
MlÄÖ
57.76
30.90
11.34
100.00
10) ¨ÉAUÀ¼ÀÆgÀÄ £ÀUÀgÀ f¯Éè
1
qÁ|| zÉÆqÀØgÀAUÉÃUËqÀ
28.88
15.45
5.67
50.00
2
©.eÉ.¥ÀÄlÖ¸Áé«Ä
28.88
15.45
5.67
50.00
3
JA.Dgï.¹ÃvÁgÁªÀiï
28.88
15.45
5.67
50.00
4
r.J¸ï.«ÃgÀAiÀÄå
28.88
15.45
5.67
50.00
5
©.J¸ï.¸ÀÄgÉñï
28.88
15.45
5.67
50.00
6
qÁ||J¸ï.Dgï.°Ã¯Á
28.88
15.45
5.67
50.00
7
Dgï.«.ªÉAPÀmÉñï
28.88
15.45
5.67
50.00
8
«ªÀįÁUËqÀ
28.88
15.45
5.67
50.00
9
¥ÉÆæÃ:JA.Dgï.zÉÆgɸÁé«Ä
28.88
15.45
5.67
50.00
10
¥ÉÆæÃ:qÁ|| ªÀÄĪÀiÁÛeï D° SÁ£ï
28.88
15.45
5.67
50.00
11
zÀAiÀiÁ£ÀAzÀ
28.88
15.45
5.67
50.00
12
vÁgÁ C£ÀÆgÁzsÀ
28.88
15.45
5.67
50.00
13
PÉ.UÉÆÃ«AzÀgÁeï
28.88
15.45
5.67
50.00
14
«.¸ÉÆÃªÀÄtÚ
28.88
15.45
5.67
50.00
15
®ºÀgï ¹AUï ¹gÉÆÃAiÀiÁ
28.88
15.45
5.67
50.00
MlÄÖ
433.20
231.75
85.05
750.00
PÀ£ÁðlPÀ gÁdå¥ÀvÀæ, UÀÄgÀĪÁgÀ, K¦æ¯ï 17, 2014
¨sÁUÀ 1
670
(gÀÆ.®PÀëUÀ¼À°è)
PÀæªÀÄ
¸ÀASÉå
«zsÁ£À¥ÀjµÀvï ¸ÀzÀ¸ÀågÀ ºÉ¸ÀgÀÄUÀ¼ÀÄ
(²æÃ/²æÃªÀÄw)
¯ÉPÀÌ ²Ã¶ðPÉ 4575-60-800-0-01
MlÄÖ
132
422
423
(11) ¨ÉAUÀ¼ÀÆgÀÄ UÁæªÀiÁAvÀgÀ f¯Éè
1
¥ÀÄlÖtÚ
28.88
15.45
5.67
50.00
2
gÁªÀÄZÀAzÀæUËqÀ
28.88
15.45
5.67
50.00
3
E.PÀȵÀÚ¥Àà
28.88
15.45
5.67
50.00
MlÄÖ
86.64
46.35
17.01
150.00
(12) ªÉÄʸÀÆgÀÄ f¯Éè
1
¹zÀÝgÁdÄ
28.88
15.45
5.67
50.00
2
J¸ï.£ÁUÀgÁdÄ
28.88
15.45
5.67
50.00
3
PÉ.«.£ÁgÁAiÀÄt¸Áé«Ä
28.88
15.45
5.67
50.00
4
Dgï.zsÀªÀÄð¸ÉãÁ
28.88
15.45
5.67
50.00
5
¹.ºÉZï.«dAiÀıÀAPÀgÀ
28.88
15.45
5.67
50.00
6
UÉÆÃ.ªÀÄzsÀĸÀÆzÀ£ï
28.88
15.45
5.67
50.00
MlÄÖ
173.28
92.70
34.02
300.00
(13) ªÀÄAqÀå f¯Éè
1
ªÀÄjw¨ÉâÃUËqÀ
28.88
15.45
5.67
50.00
2
©.gÁªÀÄPÀȵÀÚ
28.88
15.45
5.67
50.00
3
C±Àévï£ÁgÁAiÀÄt
28.88
15.45
5.67
50.00
MlÄÖ
86.64
46.35
17.01
150.00
(14) PÉÆqÀUÀÄ f¯Éè
1
JA.¹.£ÁtAiÀÄå
28.88
15.45
5.67
50.00
2
n.e磕
28.88
15.45
5.67
50.00
MlÄÖ
57.76
30.90
11.34
100.00
(15) zÀQët PÀ£ÀßqÀ f¯Éè
1
r.«.¸ÀzÁ£ÀAzÀUËqÀ
28.88
15.45
5.67
50.00
2
PÉ.ªÉÆÃ£À¥Àà ¨sÀAqÁj
28.88
15.45
5.67
50.00
3
UÀuÉñï PÁtÂðPï
28.88
15.45
5.67
50.00
MlÄÖ
86.64
46.35
17.01
150.00
(16) GqÀĦ f¯Éè
1
PÉ.¥ÀævÁ¥ÀZÀAzÀæ ±ÉnÖ
28.88
15.45
5.67
50.00
2
PÉÆÃl ²æÃ¤ªÁ¸À ¥ÀÆeÁj
28.88
15.45
5.67
50.00
MlÄÖ
57.76
30.90
11.34
100.00
¨sÁUÀ 1
PÀ£ÁðlPÀ gÁdå¥ÀvÀæ, UÀÄgÀĪÁgÀ, K¦æ¯ï 17, 2014
671
(gÀÆ.®PÀëUÀ¼À°è)
PÀæªÀÄ
¸ÀASÉå
«zsÁ£À¥ÀjµÀvï ¸ÀzÀ¸ÀågÀ ºÉ¸ÀgÀÄUÀ¼ÀÄ
(²æÃ/²æÃªÀÄw)
¯ÉPÀÌ ²Ã¶ðPÉ 4575-60-800-0-01
MlÄÖ
132
422
423
(17) ²ªÀªÉÆUÀÎ f¯Éè
1
r.ºÉZï.±ÀAPÀgÀªÀÄÆwð
28.88
15.45
5.67
50.00
2
¨sÁgÀw ±ÉnÖ
28.88
15.45
5.67
50.00
3
Dgï.PÉ.¹zÀÞgÁªÀÄtÚ
28.88
15.45
5.67
50.00
4
¥ÉÆæ: ¦.«.PÀȵÀÚ¨sÀmï
28.88
15.45
5.67
50.00
5
¨sÁ£ÀÄ¥ÀæPÁ±ï
28.88
15.45
5.67
50.00
MlÄÖ
144.40
77.25
28.35
250.00
(18) zsÁgÀªÁqÀ f¯Éè
1
ªÀÄwÛPÀnÖ«ÃgÀtÚ
28.88
15.45
5.67
50.00
2
§¸ÀªÀgÁd ºÉÆgÀnÖ
28.88
15.45
5.67
50.00
3
bÀ©â £ÁUÀgÁeï
28.88
15.45
5.67
50.00
4
ªÀiÁ£É ²æÃ¤ªÁ¸À
28.88
15.45
5.67
50.00
MlÄÖ
115.52
61.80
22.68
200.00
(19) ºÁªÉÃj
1
¸ÉÆÃªÀÄtÚ ¸Áé«Ä°AUÀ ¨Éë£ÀªÀÄgÀzÀ
28.88
15.45
5.67
50.00
MlÄÖ
28.88
15.45
5.67
50.00
(20) ©eÁ¥ÀÄgÀ f¯Éè
1
CgÀÄt ±ÀºÁ¥ÀÄgÀ
28.88
15.45
5.67
50.00
MlÄÖ
28.88
15.45
5.67
50.00
(21) ¨ÁUÀ®PÉÆÃmÉ f¯Éè
1
J¸ï.Dgï.¥Ánïï
28.88
15.45
5.67
50.00
2
f.J¸ï.£ÁåªÀÄUËqÀ
28.88
15.45
5.67
50.00
3
£ÁgÁAiÀÄt ¸Á.¨ÁAqÀUÉ
28.88
15.45
5.67
50.00
MlÄÖ
86.64
46.35
17.01
150.00
(22) aPÀ̪ÀÄUÀ¼ÀÆgÀÄ f¯Éè
1
ªÉÆÃlªÀÄä
28.88
15.45
5.67
50.00
2
J.«.UÁ¬Äwæ ±ÁAvÉÃUËqÀ
28.88
15.45
5.67
50.00
3
JA. ²æÃ¤ªÁ¸ï
28.88
15.45
5.67
50.00
MlÄÖ
86.64
46.35
17.01
150.00
(23) GvÀÛgÀ PÀ£ÀßqÀ f¯Éè
1
WÉÆÃnßPÀgï ²æÃPÁAvÀ ®PÀëöät
28.88
15.45
5.67
50.00
MlÄÖ
28.88
15.45
5.67
50.00
(24) ¨É¼ÀUÁA f¯Éè
1
«ÃgÀPÀĪÀiÁgï C¥Áà¸ÉÆÃ ¥Ánïï
28.88
15.45
5.67
50.00
2
PÀªÀlV ªÀÄoÀ ªÀĺÀAvÉñï
28.88
15.45
5.67
50.00
3
ªÀĺÁAvÉÃ±ï ²ªÁ£ÀAzÀ PËd®V
28.88
15.45
5.67
50.00
MlÄÖ
86.64
46.35
17.01
150.00
PÀ£ÁðlPÀ gÁdå¥ÀvÀæ, UÀÄgÀĪÁgÀ, K¦æ¯ï 17, 2014
¨sÁUÀ 1
672
(gÀÆ.®PÀëUÀ¼À°è)
PÀæªÀÄ
¸ÀASÉå
«zsÁ£À¥ÀjµÀvï ¸ÀzÀ¸ÀågÀ ºÉ¸ÀgÀÄUÀ¼ÀÄ
(²æÃ/²æÃªÀÄw)
¯ÉPÀÌ ²Ã¶ðPÉ 4575-60-800-0-01
MlÄÖ
132
422
423
(25) ºÁ¸À£À f¯Éè
1
¥ÀmÉÃ¯ï ²ªÀgÁA
28.88
15.45
5.67
50.00
2
©.©.²ªÀ¥Àà
28.88
15.45
5.67
50.00
MlÄÖ
57.76
30.90
11.34
100.00
MlÄÖ ªÉÆvÀÛ
2108.24
1127.85
413.91
3650.00
PR. 327
J¸ï.GªÀiÁªÀw,
¸ÀPÁðgÀzÀ C¢üãÀ PÁAiÀÄðzÀ²ð-1 & 2,
AiÉÆÃd£É, PÁAiÀÄðPÀæªÀÄ ¸ÀAAiÉÆÃd£É ªÀÄvÀÄÛ ¸ÁATåPÀ E¯ÁSÉ.
²PÀët ¸ÀaªÁ®AiÀÄ
«µÀAiÀÄ
:
¸ÀPÁðj ¥ÁæxÀ«ÄPÀ ±Á¯ÉUÀ¼À°è ¸ÉÃªÉ ¸À°è¸ÀÄwÛgÀĪÀ DAiÀiÁUÀ¼À ªÀiÁ¹PÀ UËgÀªÀ zsÀ£ÀªÀ£ÀÄß
gÀÆ.3000/- ¢AzÀ gÀÆ.5000/- PÉÌ ºÉaѸÀĪÀ §UÉÎ ºÁUÀÆ gÁ¶ÖçÃAiÀÄ ¦AZÀt ªÀåªÀ¸ÉÜ –
J¯ïLn (N.P.S.-lite scheme) ¸Ë®¨sÀåªÀ£ÀÄß MzÀV¸ÀĪÀ §UÉÎ.
NzÀ¯ÁVzÉ :
1. ¸ÀPÁðj DzÉñÀ ¸ÀASÉå: Er 100 ¦©J¸ï 2009, ¢£ÁAPÀ: 09-09-2009.
2. DAiÀÄÄPÀÛgÀÄ ¸ÁªÀðd¤PÀ ²PÀët E¯ÁSÉ, ¨ÉAUÀ¼ÀÆgÀÄ gÀªÀgÀ ¥ÀvÀæ ¸ÀASÉå:
J.r.JA.2(2)/DAiÀiÁ./145/2006-07, ¢£ÁAPÀ: 08-07-2013.
¥Àæ¸ÁÛªÀ£É :
ªÉÄÃ¯É NzÀ¯ÁVgÀĪÀ (1)gÀ ¸ÀPÁðj DzÉñÀzÀ°è gÁdå ¸ÀPÁðj ¥ÁæxÀ«ÄPÀ ±Á¯ÉUÀ¼À°è PÁAiÀÄð¤ªÀð»¸ÀÄwÛgÀĪÀ DAiÀiÁUÀ¼À ªÀiÁ¹PÀ
ªÉÃvÀ£ÀªÀ£ÀÄß gÀÆ.1500/- jAzÀ 3000/- PÉÌ ºÉaѸÀ¯ÁVvÀÄÛ. ªÉÄÃ¯É NzÀ¯ÁVgÀĪÀ (2) gÀ ¥ÀvÀæzÀ°è DAiÀÄÄPÀÛgÀÄ, ¸ÁªÀðd¤PÀ ²PÀët E¯ÁSÉ,
¨ÉAUÀ¼ÀÆgÀÄ EªÀgÀÄ DAiÀiÁUÀ¼À ªÀiÁ¹PÀ ªÉÃvÀ£ÀªÀ£ÀÄß ºÉaѸÀĪÀ §UÉÎ ºÁUÀÆ DAiÀiÁUÀ¼ÀÄ ¤ªÀÈwÛ ºÉÆA¢zÀ £ÀAvÀgÀ ¤ªÀÈwÛ ªÉÃvÀ£À ¤ÃqÀĪÀ §UÉÎ
¸ÀPÁðgÀPÉÌ ¥Àæ¸ÁÛªÀ£É ¸À°è¹gÀÄvÁÛgÉ. ¸ÀzÀj ¥Àæ¸ÁÛªÀ£ÉAiÀÄ£ÀÄß ¸ÀPÁðgÀ PÀÆ®APÀµÀªÁV ¥Àj²Ã°¹ ¸ÀPÁðj ¥ÁæxÀ«ÄPÀ ±Á¯ÉUÀ¼À°è ¸ÉÃªÉ ¸À°è¸ÀÄwÛgÀĪÀ
DAiÀiÁUÀ¼À ªÀiÁ¹PÀ ªÉÃvÀ£ÀªÀ£ÀÄß ºÉaѸÀĪÀ §UÉÎ ºÁUÀÆ ¤ªÀÈwÛ £ÀAvÀgÀ ¤ªÀÈwÛ ªÉÃvÀ£À ¸Ë®¨sÀå ¤ÃqÀĪÀ §UÉÎ F PɼÀPÀAqÀAvÉ DzÉò¹zÉ.
¸ÀPÁðgÀzÀ DzÉñÀ ¸ÀASÉå: Er 136 ¦©J¸ï 2012, ¨ÉAUÀ¼ÀÆgÀÄ ¢£ÁAPÀ: 26-12-2013.
2.
gÁdå ¸ÀPÁðj »jAiÀÄ ¥ÁæxÀ«ÄPÀ ±Á¯ÉUÀ¼À°è ¸ÉÃªÉ ¸À°è¸ÀÄwÛgÀĪÀ DAiÀiÁUÀ¼À ªÀiÁ¹PÀ UËgÀªÀzsÀ£ÀªÀ£ÀÄß (Honararium) gÀÆ.3000/-
¢AzÀ gÀÆ.5000/- (LzÀÄ ¸Á«gÀ gÀÆ¥Á¬ÄUÀ¼ÀÄ ªÀiÁvÀæ) UÀ½UÉ ºÉaѹ ¸ÀPÁðgÀzÀ ªÀÄAdÆgÁw ¤ÃqÀ¯ÁVzÉ. F UËgÀªÀzsÀ£ÀªÀÅ ®ªÀiï¸ÀªÀiï
(Lumpsum) UËgÀªÀzsÀ£ÀªÁVgÀÄvÀÛzÉ. r.J. CxÀªÁ PÀ¤µÀ× ªÉÃvÀ£ÀPÉÌ ¸ÀA§AzsÀ¥ÀnÖgÀĪÀÅ¢®è. F ºÉZÀÄѪÀj ªÉZÀѪÀ£ÀÄß E¯ÁSÉAiÀÄÄ f¯Áè
ªÀ®AiÀÄzÀrAiÀÄ DAiÀĪÀåAiÀÄ CªÀPÁ±À¢AzÀ¯Éà ¯ÉPÀÌ ²Ã¶ðPÉ 2202-01-101-0-71 (AiÉÆÃd£ÉÃvÀgÀ) Cr ¤UÀ¢AiÀiÁVgÀĪÀ f¯Áè DAiÀĪÀåAiÀÄzÀ
«ÄwAiÉÆ¼ÀUÉà ¨sÀj¸ÀvÀPÀÌzÀÄÝ. F ¸ÀA§AzsÀ ºÉZÀÄѪÀj C£ÀÄzÁ£À ¤ÃqÀ¯ÁUÀĪÀÅ¢®è ºÁUÀÆ PÀAzÁAiÀÄ E¯ÁSÉAiÀÄ UÁæªÀĸÀºÁAiÀÄPÀjUÉ
C£Àé¬Ä¸ÀĪÀAvÉ gÁ¶ÖçÃAiÀÄ ¦AZÀt ªÀåªÀ¸ÉÜ-J¯ïLn (N.P.S.-lite scheme) ¸Ë®¨sÀåªÀ£ÀÄß eÁjUÉÆ½¸À®Ä ¸ÀºÀ ªÀÄAdÆgÁw ¤ÃrzÉ. C®èzÉÃ
ªÀiÁ¹PÀ ¸ÀA¨sÁªÀ£ÉAiÀÄ£ÀÄß ¸ÀÆPÀÛªÁV ºÉaѸÀ®Ä ¸ÀºÀ ¸ÀºÀªÀÄw ¤ÃrzÉ.
3.
F DzÉñÀªÀ£ÀÄß DyðPÀ E¯ÁSÉAiÀÄ n¥Ààt ¸ÀASÉå: DE 616 ªÉZÀÑ-8/2013, ¢£ÁAPÀ:11-10-2013gÀ°è ¤ÃrgÀĪÀ ¸ÀºÀªÀÄwAiÉÆA¢UÉ
ºÉÆgÀr¸À¯ÁVzÉ.
PR. 328
SC-150
PÀ£ÁðlPÀ gÁdå¥Á®gÀ DzÉñÁ£ÀĸÁgÀ ªÀÄvÀÄÛ CªÀgÀ ºÉ¸Àj£À°è
J¸ï.©.¥ÀlUÁgÀ,
¸ÀPÁðgÀzÀ C¢üãÀ PÁAiÀÄðzÀ²ð,
²PÀët E¯ÁSÉ (¥ÁæxÀ«ÄPÀ).
ªÀÄÄzÀæPÀgÀÄ ºÁUÀÆ ¥ÀæPÁ±ÀPÀgÀÄ:- ¸ÀAPÀ®£Á¢üPÁjUÀ¼ÀÄ, PÀ£ÁðlPÀ gÁdå¥ÀvÀæ, ¸ÀPÁðj PÉÃAzÀæ ªÀÄÄzÀæuÁ®AiÀÄ, ¨ÉAUÀ¼ÀÆgÀÄ-59
R.N.I. No. KARBIL/2001/47147 POSTAL REGN. No. RNP/KA/BGS/2202/2014-16
Licensed to post without prepayment WPP No. 297