gÁdå ¸ÀPÁðgÀzÀ

J¯Áè E

C0

Sub:

Approval

to

for the expansio

manufacture of

Belagavi District.

Read

1) Proceedings

2) Proceedings

meeting held on

Preamble:

M/s Ashok Iron & Works Pvt. Ltd., has

annum for manufacture of “Block Heads and

persons in 29 acres 32 guntas of own land at

In the 31st Land Audit Committee meet

to recommend to SLSWCC for approval of

593/NA at Machhe Industrial Area, Machhe V

The proposal was examined & approve

03.08.2016. Government has examined the

aspects.

Hence the following order.

GOVERNMENT O

Government is pleased to accord in-p

expansion of its unit to increase production c

an investment of ` 103.00 crores, generating

552, 553 & 593/NA at Machhe Industrial Are

and concessions:

Land

:

29 acres

Machhe V

Water

:

150 KLPD

Power

:

5500 KV

Incentives &

Concessions

:

As per Ka

¸ÀA¥ÀÄl 152

Volume 152

¨ÉAUÀ¼ÀÆgÀÄ, UÀÄgÀ

Bengaluru, Th

(53)

¨sÁUÀ 1

ªÀÄÄRå DzÉñÀUÀ¼ÀÄ ºÁUÀÆ ¸ÀÄvÉÆÛÃ¯É ªÀÄÄ

E¯ÁSÉUÀ½UÀÆ ¸ÀA§A¢ü¹zÀ DzÉñÀUÀ¼ÀÄ

0MMERCE & INDUSTRIES SECRETARIAT

the

proposal

of

M/s

Ashok

Iron

&

Work

n of its unit to increase production capacity to 36000 tonne

“Block Heads and Housings” at Machhe Industrial Area,

.

of the 31st Land Audit Committee (LAC) meeting held on 05.0

of the 93rd State Level Single Window Clearance Comm

03.08.2016.

proposed for the expansion of its unit to increase production

d Housings”, with an investment of ` 103.00 crores, generati

t Sy. Nos. 552, 553 & 593/NA at Machhe Industrial Area, Mac

ting held on 05.07.2016, the Committee after detailed discus

the project to be set up in 29 acres 32 guntas of their own

Village, Belagavi District.

ed in the 93rd State Level Single Window Clearance Committe

e recommendations made by the State Level Single Window

RDER No. CI 249 SPI 2016, BENGALURU, DATED: 31.08.2

principle approval to the investment proposal of M/s Ashok I

capacity to 36000 tonnes per annum for manufacture of “Blo

g employment to about 1175 persons in 29 acres 32 guntas

a, Machhe Village, Belagavi District with the following infrastr

32 guntas of own land at Sy. Nos. 552, 553 & 593/NA at Ma

Village, Belagavi District.

D water from KIADB.

A from HESCOM.

arnataka Industrial Policy 2014-19.

gÀĪÁgÀ, d£ÀªÀj 26, 2017 (ªÀiÁWÀ 6, ±ÀPÀ ªÀµÀð 1

ursday, January 26, 2017 (Magha 6, Shaka Varsha

ÄAvÁzÀ

ks

Pvt.

Ltd.,

es per annum for

Machhe Village,

07.2016.

mittee (SLSWCC)

n capacity to 36000 tonnes per

ng employment to about 1175

chhe Village, Belagavi District.

sions, the Committee resolved

n land at Sy. Nos. 552, 553 &

ee (SLSWCC) Meeting held on

w Clearance Committee in all

2016

ron & Works Pvt. Ltd., for the

ock Heads and Housings”, with

s of their own land at Sy. Nos.

ructure assistances, incentives

achhe Industrial Area,

1938)

1938)

¸ÀAaPÉ 4

Issue 4

54

PÀ£ÁðlPÀ gÁdå¥ÀvÀæ, UÀÄgÀĪÁgÀ, d£ÀªÀj 26, 2017

¨sÁUÀ 1

Sanction of the above infrastructure facilities, incentives and concessions is subject to the following terms and conditions:

1.

Environment: The company to obtain Consent for Establishment and Consent for Operation from KSPCB and environmental

clearance from MoEF, Govt. of India or the Dept of Forest, Ecology & Environment, Govt. of Karnataka, if applicable.

2.

Employment: The Company shall comply with the provisions of Industrial Policy 2014-19 of Govt. of Karnataka with respect

to local employment on the project. Prepare a plan for development of Human Resources required for the project, train local

people. A copy of Human Resources Development plan shall be sent to the Commissioner for Industrial Development &

Director of Industries and Commerce for monitoring.

3.

Vendor Development: Wherever there is scope for vendor development for the project, the company shall prepare a vendor

development plan, develop local vendors and procure the required inputs, components and sub-assemblies from these local

vendor units. A copy of the vendor development plan shall be sent to the Commissioner for Industrial Development & Director

of Industries and Commerce for monitoring.

4.

Social Infrastructure Development: The Company is advised to take up social infrastructure development projects in the

vicinity of the proposed location of the unit and comply with the stipulation of Company Act, 2013 A copy of such projects

shall be sent to the Commissioner for Industrial Development & Director of Industries and Commerce for monitoring.

5.

Others.

a)

The company shall adopt rainwater harvesting, waste water recycling and water conservation techniques. Zero

discharge facility should be adopted wherever applicable.

b)

The company shall take all statutory and other necessary clearances from the competent authorities including Govt. of

India.

c)

As part of “Ease of Doing Business” Government vide order No. CI 89 SPI 2013, Dated: 20.12.2014 has accorded

approval to operationalise e-Udyami Phase II for obtaining various clearances / approvals / licenses etc., through

common e-platform for the projects approved through District Level Single Window Clearance Committee (DLSWCC)

or State Level Single Window Clearance Committee (SLSWCC) or State High Level Clearance Committee (SHLCC)

w.e.f., 01.01.2015.

d)

The approvals / NOCs of following Departments have been covered under Phase II of e-Udyami.

i.

Karnataka Industrial Areas Development Board.

ii.

Karnataka Small Scale Industries Development Corporation.

iii.

Karnataka State Pollution Control Board.

iv.

Factories, Boilers, Industrial Safety and Health Department

v.

Industries and Commerce Department

vi.

Town Planning Department and Local Planning Authorities

vii.

Municipal Administration Department

viii.

BESCOM/GESCOM/HESCOM/CESCOM/MESCOM

ix.

Karnataka State Fire and Emergency Services Department

x.

Water Resources Department.

e)

The login and passwords which are used for filing application through e-Udyami Phase I are also applicable for filing

application through e-Udyami Phase II. E-Udyami Phase II web application may be accessed through

www.ebizkarnataka.gov.in and online application along with necessary documents may please be filed for any of

above Departments’ approval / NOCs.

f)

Karnataka Udyog Mitra (KUM) would provide the necessary escort services for the speedy implementation of your

project. You are requested to inform the progress made in the implementation of the project every quarter in the

proforma.

This approval is valid for a period of two years from the date of issue of this Government Order.

P.R. 01

SC. 25

By Order and in the name of the Governor of Karnataka,

S. UMADEVI

Desk Officer (Technical Cell),

Commerce & Industries Department.

C0MMERCE & INDUSTRIES SECRETARIAT

Sub:

Approval to the proposal of M/s Golden Hatcheries to establish a “Solar Energy Plant” at

Hooyidure Village, Bukkapatna Hobli, Sira, Tumakuru District.

Read

1 Proceedings of the 31st Land Audit Committee (LAC) meeting held on 05.07.2016.

¨sÁUÀ 1

PÀ£ÁðlPÀ gÁdå¥ÀvÀæ, UÀÄgÀĪÁgÀ, d£ÀªÀj 26, 2017

55

2) Proceedings of the 93rd State Level Single Window Clearance Committee (SLSWCC)

meeting held on 03.08.2016.

Preamble:

M/s Golden Hatcheries has proposed to establish a “Solar Energy Plant”, with an investment of ` 262.50 crores, generating

employment to about 366 persons at Hooyidure Village, Bukkapatna Hobli, Sira, Tumakuru District.

The representative of the company appeared before the 31st Land Audit Committee meeting held on 05.07.2016 and highlighted

the project proposal.

The Committee noted the above and resolved to recommend to SLSWCC for approval of the project to be set up in 210 acres of

land to be purchased U/s 109 of KLR Act at Sy. Nos. 161, 162, 162/1, 162/2, 162/3, 162/4, 162/5 and 162/6 of Hooyidure Village,

Bukkapatna Hobli, Sira, Tumakuru District, subject to obtaining necessary approvals from KREDL.

The proposal was examined & approved in the 93rd State Level Single Window Clearance Committee (SLSWCC) Meeting held on

03.08.2016. Government has examined the recommendations made by the State Level Single Window Clearance Committee in all

aspects.

Hence the following order.

GOVERNMENT ORDER No. CI 248 SPI 2016, BENGALURU, DATED: 01.09.2016

Government is pleased to accord in-principle approval to the investment proposal of M/s Golden Hatcheries to establish a “Solar

Energy Plant”, with an investment of ` 262.50 crores, generating employment to about 366 persons at Sy. Nos. 161, 162, 162/1, 162/2,

162/3, 162/4, 162/5 and 162/6 of Hooyidure Village, Bukkapatna Hobli, Sira, Tumakuru District with the following infrastructure

assistances, incentives and concessions subject to obtaining necessary approvals from KREDL:

Land

:

210 acres of land to be purchased u/s 109 of KLR Act at Sy. Nos. 161, 162, 162/1, 162/2,

162/3, 162/4, 162/5 and 162/6 of Hooyidure Village, Bukkapatna Hobli, Sira, Tumakuru

District.

Water

:

1500 LPD from own sources.

Power

:

-

Incentives &

Concessions

:

As per Renewable Energy Policy of the State.

Sanction of the above infrastructure facilities, incentives and concessions is subject to the following terms and

conditions:

1.

Environment: The company to obtain Consent for Establishment and Consent for Operation from KSPCB and environmental

clearance from MoEF, Govt. of India or the Dept of Forest, Ecology & Environment, Govt. of Karnataka, if applicable.

2.

Employment: The Company shall comply with the provisions of Renewable Energy Policy of Govt. of Karnataka with respect

to local employment on the project. Prepare a plan for development of Human Resources required for the project, train local

people. A copy of Human Resources Development plan shall be sent to the Commissioner for Industrial Development &

Director of Industries and Commerce for monitoring.

3.

Vendor Development: Wherever there is scope for vendor development for the project, the company shall prepare a vendor

development plan, develop local vendors and procure the required inputs, components and sub-assemblies from these local

vendor units. A copy of the vendor development plan shall be sent to the Commissioner for Industrial Development & Director

of Industries and Commerce for monitoring.

4.

Social Infrastructure Development: The Company is advised to take up social infrastructure development projects in the

vicinity of the proposed location of the unit and comply with the stipulation of Company Act 2013. A copy of such projects shall

be sent to the Commissioner for Industrial Development & Director of Industries and Commerce for monitoring.

5.

Others:

a)

The company shall adopt rainwater harvesting, waste water recycling and water conservation techniques. Zero

discharge facility should be adopted wherever applicable.

b)

The company shall take all statutory and other necessary clearances from the competent authorities including Govt.

of India.

c)

As part of “Ease of Doing Business” Government vide order No. CI 89 SPI 2013, Dated: 20.12.2014 has accorded

approval to operationalise e-Udyami Phase II for obtaining various clearances / approvals / licenses etc., through

common e-platform for the projects approved through District Level Single Window Clearance Committee

(DLSWCC) or State Level Single Window Clearance Committee (SLSWCC) or State High Level Clearance

Committee (SHLCC) w.e.f., 01.01.2015.

d)

The approvals / NOCs of following Departments have been covered under Phase II of e-Udyami.

56

PÀ£ÁðlPÀ gÁdå¥ÀvÀæ, UÀÄgÀĪÁgÀ, d£ÀªÀj 26, 2017

¨sÁUÀ 1

i.

Karnataka Industrial Areas Development Board.

ii.

Karnataka Small Scale Industries Development Corporation.

iii.

Karnataka State Pollution Control Board.

iv.

Factories, Boilers, Industrial Safety and Health Department

v.

Industries and Commerce Department

vi.

Town Planning Department and Local Planning Authorities

vii.

Municipal Administration Department

viii.

BESCOM/GESCOM/HESCOM/CESCOM/MESCOM

ix.

Karnataka State Fire and Emergency Services Department.

x.

Water Resources Department

e)

The login and passwords which are used for filing application through e-Udyami Phase I are also applicable for filing

application through e-Udyami Phase II. E-Udyami Phase II web application may be accessed through

www.ebizkarnataka.gov.in and online application along with necessary documents may please be filed for any of

above Departments’ approval / NOCs.

f)

Karnataka Udyog Mitra (KUM) would provide the necessary escort services for the speedy implementation of your

project. You are requested to inform the progress made in the implementation of the project every quarter in the

proforma.

This approval is valid for a period of two years from the date of issue of this Government Order.

P.R. 02

SC. 25

By Order and in the name of the Governor of Karnataka,

S. UMADEVI

Desk Officer (Technical Cell),

Commerce & Industries Department.

C0MMERCE & INDUSTRIES SECRETARIAT

Sub:

Approval to the proposal of M/s Hansoge Enterprises Pvt. Ltd., to establish a “Resort” at

Kajjehalli Estates, Kannehally Village, Gonibeedu Hobli, Mudigere Taluk, Chikkamagaluru

District.

Read

1) Proceedings of the 30th Land Audit Committee (LAC) meeting held on 25.06.2016.

2) Proceedings of the 93rd State Level Single Window Clearance Committee (SLSWCC)

meeting held on 03.08.2016.

Preamble:

M/s Hansoge Enterprises Pvt. Ltd., has proposed to establish a “Resort”, with an investment of ` 126.00 crores, generating

employment to about 140 persons at 24 acres 29 guntas of own land in Sy. Nos. 59/4, 59/1, 59/2, 59/3, 229/1, 229/2, 229/3, 230/1,

230/2 of Kajjehalli Estates, Kannehally Village, Gonibeedu Hobli, Mudigere Taluk, Chikkamagaluru District.

In the 30th Land Audit Committee meeting held on 25.06.2016, the Committee noted the land utilization details. After detailed

discussions, the Committee resolved to recommend to SLSWCC for approval of the project to set up Resort in 24 Acres 29 Guntas of

their own land at Sy. Nos. 59/4, 59/1, 59/2, 59/3, 229/1,229/2,229/3,230/1,230/2 of Kajjehalli Estates, Kannehally Village, Gonibeedu

Hobli, Mudigere Taluk, Chikkamagaluru District, subject to company adopting zero discharge and scientific disposal of solid waste.

The proposal was examined & approved in the 93rd State Level Single Window Clearance Committee (SLSWCC) Meeting held on

03.08.2016. Government has examined the recommendations made by the State Level Single Window Clearance Committee in all

aspects.

Hence the following order.

GOVERNMENT ORDER No. CI 247 SPI 2016, BENGALURU, DATED: 31.08.2016

Government is pleased to accord in-principle approval to the investment proposal of M/s Hansoge Enterprises Pvt. Ltd., to establish

a “Resort”, with an investment of Rs. 126.00 crores, generating employment to about 140 persons at 24 acres 29 guntas of own land in

Sy. Nos. 59/4, 59/1, 59/2, 59/3, 229/1, 229/2, 229/3, 230/1, 230/2 of Kajjehalli Estates, Kannehally Village, Gonibeedu Hobli, Mudigere

Taluk, Chikkmagalur District with the following infrastructure assistances, incentives and concessions subject to company adopting zero

discharge and scientific disposal of solid waste:

Land

:

24 acres 29 guntas of own land in Sy. Nos. 59/4, 59/1, 59/2, 59/3, 229/1, 229/2, 229/3,

230/1, 230/2 of Kajjehalli Estates, Kannehally Village, Gonibeedu Hobli, Mudigere Taluk,

Chikkamagaluru District.

Water

:

100 KLPD Water from Local Authority.

¨sÁUÀ 1

PÀ£ÁðlPÀ gÁdå¥ÀvÀæ, UÀÄgÀĪÁgÀ, d£ÀªÀj 26, 2017

57

Power

:

220 KVA from MESCOM.

Incentives &

Concessions

:

As per applicable policy of the State.

Sanction of the above infrastructure facilities, incentives and concessions is subject to the following terms and conditions:

1.

Environment: The company to obtain Consent for Establishment and Consent for Operation from KSPCB and environmental

clearance from MoEF, Govt. of India or the Dept of Forest, Ecology & Environment, Govt. of Karnataka, if applicable.

2.

Employment: The Company shall comply with the provisions of applicable policy of Govt. of Karnataka with respect to local

employment on the project. Prepare a plan for development of Human Resources required for the project, train local people.

A copy of Human Resources Development plan shall be sent to the Commissioner for Industrial Development & Director of

Industries and Commerce for monitoring.

3.

Vendor Development: Wherever there is scope for vendor development for the project, the company shall prepare a vendor

development plan, develop local vendors and procure the required inputs, components and sub-assemblies from these local

vendor units. A copy of the vendor development plan shall be sent to the Commissioner for Industrial Development & Director

of Industries and Commerce for monitoring.

4.

Social Infrastructure Development: The Company is advised to take up social infrastructure development projects in the

vicinity of the proposed location of the unit and comply with the stipulation of Company Act 2013. A copy of such projects shall

be sent to the Commissioner for Industrial Development & Director of Industries and Commerce for monitoring

5.

Others.

a)

The company shall adopt rainwater harvesting, waste water recycling and water conservation techniques. Zero

discharge facility should be adopted wherever applicable.

b)

The company shall take all statutory and other necessary clearances from the competent authorities including Govt. of

India.

c)

As part of “Ease of Doing Business” Government vide order No. CI 89 SPI 2013, Dated: 20.12.2014 has accorded

approval to operationalise e-Udyami Phase II for obtaining various clearances / approvals / licenses etc., through

common e-platform for the projects approved through District Level Single Window Clearance Committee (DLSWCC) or

State Level Single Window Clearance Committee (SLSWCC) or State High Level Clearance Committee (SHLCC) w.e.f.,

01.01.2015.

d)

The approvals / NOCs of following Departments have been covered under Phase II of e-Udyami.

i.

Karnataka Industrial Areas Development Board.

ii.

Karnataka Small Scale Industries Development Corporation.

iii.

Karnataka State Pollution Control Board.

iv.

Factories, Boilers, Industrial Safety and Health Department

v.

Industries and Commerce Department

vi.

Town Planning Department and Local Planning Authorities

vii.

Municipal Administration Department

viii.

BESCOM/GESCOM/HESCOM/CESCOM/MESCOM

ix.

Karnataka State Fire and Emergency Services Department

x.

Water Resources Department

e)

The login and passwords which are used for filing application through e-Udyami Phase I are also applicable for filing

application through e-Udyami Phase II. E-Udyami Phase II web application may be accessed through

www.ebizkarnataka.gov.in and online application along with necessary documents may please be filed for any of above

Departments’ approval / NOCs.

f)

Karnataka Udyog Mitra (KUM) would provide the necessary escort services for the speedy implementation of your

project. You are requested to inform the progress made in the implementation of the project every quarter in the

proforma.

This approval is valid for a period of two years from the date of issue of this Government Order.

P.R. 03

SC. 25

By Order and in the name of the Governor of Karnataka,

S. UMADEVI

Desk Officer (Technical Cell),

Commerce & Industries Department.

58

PÀ£ÁðlPÀ gÁdå¥ÀvÀæ, UÀÄgÀĪÁgÀ, d£ÀªÀj 26, 2017

¨sÁUÀ 1

C0MMERCE & INDUSTRIES SECRETARIAT

Sub:

Approval to the proposal of M/s Intel Technology India Pvt. Ltd., to establish a “Multi level car

parking” at Devarabeesanhalli, Varthur Hobli, Bengaluru East Taluk, Bengaluru Urban District.

Read

1) Proceedings of the 30th Land Audit Committee (LAC) meeting held on 25.06.2016.

2)

Proceedings of the 93rd State Level Single Window Clearance Committee (SLSWCC)

meeting held on 03.08.2016.

Preamble:

M/s Intel Technology India Pvt. Ltd., has proposed to establish a “Multi level car parking”, with an investment of ` 210.00 crores,

generating employment to about 50 persons at 4 acres out of 42 acres 28 guntas of own land at 23-56P, Devarabeesanhalli, Varthur

Hobli, Bengaluru East Taluk, Bengaluru Urban District.

In the 30th Land Audit Committee meeting held on 25.06.2016, the Committee noted the land utilization details. After detailed

discussions, the Committee resolved to recommend to SLSWCC for approval of the project to set up Multi level car parking in 4 acres of

own land out of 42 Acres 28 Guntas of land which was allotted by KIADB at Sy. No.23-56P/P, Devarabeesanhalli Varthur Hobli,

Bengaluru East Taluk, Bengaluru Urban District, subject to obtaining necessary clearances on land use plan as per zoning regulations.

The proposal was examined & approved in the 93rd State Level Single Window Clearance Committee (SLSWCC) Meeting held on

03.08.2016. Government has examined the recommendations made by the State Level Single Window Clearance Committee in all

aspects.

Hence the following order.

GOVERNMENT ORDER No. CI 246 SPI 2016, BENGALURU, DATED: 31.08.2016

Government is pleased to accord in-principle approval to the investment proposal of M/s Intel Technology India Pvt. Ltd., to

establish a “Multi level car parking”, with an investment of ` 210.00 crores, generating employment to about 50 persons at 4 acres out of

42 acres 28 guntas of own land at 23-56P, Devarabeesanhalli, Varthur Hobli, Bengaluru East Taluk, Bengaluru Urban District with the

following infrastructure assistances, subject to obtaining necessary clearances on land use plan as per zoning regulations:

Land

:

4 acres out of 42 acres 28 guntas of own land at 23-56P, Devarabeesanhalli Varthur Hobli,

Bengaluru East Taluk, Bengaluru Urban District.

Water

:

2 KLPD Water from Local Authority.

Power

:

-

Sanction of the above infrastructure facilities, incentives and concessions is subject to the following terms and conditions:

1.

Environment: The company to obtain Consent for Establishment and Consent for Operation from KSPCB and environmental

clearance from MoEF, Govt. of India or the Dept of Forest, Ecology & Environment, Govt. of Karnataka, if applicable.

2.

Employment: The Company shall comply with the provisions of applicable policy of Govt. of Karnataka with respect to local

employment on the project. Prepare a plan for development of Human Resources required for the project, train local people.

A copy of Human Resources Development plan shall be sent to the Commissioner for Industrial Development & Director of

Industries and Commerce for monitoring.

3.

Vendor Development: Wherever there is scope for vendor development for the project, the company shall prepare a vendor

development plan, develop local vendors and procure the required inputs, components and sub-assemblies from these local

vendor units. A copy of the vendor development plan shall be sent to the Commissioner for Industrial Development & Director

of Industries and Commerce for monitoring.

4.

Social Infrastructure Development: The Company is advised to take up social infrastructure development projects in the

vicinity of the proposed location of the unit and comply with the stipulation of Company Act 2013. A copy of such projects shall

be sent to the Commissioner for Industrial Development & Director of Industries and Commerce for monitoring.

5.

Others.

a)

The company shall adopt rainwater harvesting, waste water recycling and water conservation techniques. Zero

discharge facility should be adopted wherever applicable.

b)

The company shall take all statutory and other necessary clearances from the competent authorities including

Govt. of India.

c)

As part of “Ease of Doing Business” Government vide order No. CI 89 SPI 2013, Dated: 20.12.2014 has

accorded approval to operationalise e-Udyami Phase II for obtaining various clearances / approvals / licenses

etc., through common e-platform for the projects approved through District Level Single Window Clearance

Committee (DLSWCC) or State Level Single Window Clearance Committee (SLSWCC) or State High Level

Clearance Committee (SHLCC) w.e.f., 01.01.2015.

¨sÁUÀ 1

PÀ£ÁðlPÀ gÁdå¥ÀvÀæ, UÀÄgÀĪÁgÀ, d£ÀªÀj 26, 2017

59

d)

The approvals / NOCs of following Departments have been covered under Phase II of e-Udyami.

i.

Karnataka Industrial Areas Development Board.

ii.

Karnataka Small Scale Industries Development Corporation.

iii.

Karnataka State Pollution Control Board.

iv.

Factories, Boilers, Industrial Safety and Health Department

v.

Industries and Commerce Department

vi.

Town Planning Department and Local Planning Authorities

vii.

Municipal Administration Department

viii.

BESCOM/GESCOM/HESCOM/CESCOM/MESCOM

ix.

Karnataka State Fire and Emergency Services Department

x.

Water Resources Department

e)

The login and passwords which are used for filing application through e-Udyami Phase I are also applicable for filing

application through e-Udyami Phase II. E-Udyami Phase II web application may be accessed through

www.ebizkarnataka.gov.in and online application along with necessary documents may please be filed for any of above

Departments’ approval / NOCs.

f)

Karnataka Udyog Mitra (KUM) would provide the necessary escort services for the speedy implementation of your

project. You are requested to inform the progress made in the implementation of the project every quarter in the

proforma.

This approval is valid for a period of two years from the date of issue of this Government Order.

P.R. 04

SC. 25

By Order and in the name of the Governor of Karnataka,

S. UMADEVI

Desk Officer (Technical Cell),

Commerce & Industries Department.

C0MMERCE & INDUSTRIES SECRETARIAT

Sub:

Approval to the proposal of M/s IBN Sina Nature Cure Pvt. Ltd., to establish a “Nature Cure

Hospital” at Hasaruvalli Village, Thymagondlu Hobli, Nelamangala Taluk, Bengaluru Rural

District.

Read

1) Proceedings of the 30th Land Audit Committee (LAC) meeting held on 25.06.2016.

2) Proceedings of the 93rd State Level Single Window Clearance Committee (SLSWCC)

meeting held on 03.08.2016.

Preamble:

M/s IBN Sina Nature Cure Pvt. Ltd., has proposed to establish a “Nature Cure Hospital”, with an investment of ` 211.24 crores,

generating employment to about 385 persons at 37 acres 33 guntas of land at Hasaruvalli Village, Thymagondlu Hobli, Nelamangala

Taluk, Bengaluru Rural District.

The representative of the company appeared before the 30th Land Audit Committee held on 25.06.2016 and highlighted the project

proposal.

Deputy Director, Nelamangala Planning Authority informed the Committee that many Sy. Nos. identified for the project fall under

Zone-3 of TGR Catchment area.

The Committee noted the above and resolved to recommend to SLSWCC for approval of the project to set up Nature care

Healthcare facility in 67 Acres 36 guntas of land to be purchased U/s 109 of KLR Act at Byadarahalli Village, Thymagondlu,

Nelamangala taluk, Bengaluru Rural District, subject to obtaining NOC from Nelamangala Planning Authority for the proposed activity.

The company also to ensure zero discharge from the hospital as per KSPCB norms.

Further, in view of the above, the promoter vide their letter dated: 16.06.2016 has informed that they have identified alternate 37

acre 33 gunts of land at Sy. Nos. 134, 135/1 and 135/2 at Hasaruvalli Village, Thymagondlu Hobli, Nelmangala Taluk, Bengaluru Rural

District for the establishment of Nature Cure Hospital with an investment of ` 211.24 crore.

Nelamangala Planning Authority vide their letter dated: 19.07.2016 has informed that the proposed lands at Sy. Nos. 134, 135/1

and 135/2 at Hasaruvalli Village, Thymagondlu Hobli, Nelmangala Taluk, Bengaluru Rural District falls under Zone 1 of Tippagondanhalli

Reservoir (TGR) and reserved for agricultural activity. Further, it is informed that under special circumstances, there is a provision for

construction for hospital with the plot coverage limited to 15% with ground floor and first floor buildings.

60

PÀ£ÁðlPÀ gÁdå¥ÀvÀæ, UÀÄgÀĪÁgÀ, d£ÀªÀj 26, 2017

¨sÁUÀ 1

The proposal was examined & approved in the 93rd State Level Single Window Clearance Committee (SLSWCC) Meeting held on

03.08.2016. Government has examined the recommendations made by the State Level Single Window Clearance Committee in all

aspects.

Hence the following order.

GOVERNMENT ORDER No. CI 245 SPI 2016, BENGALURU, DATED: 01.09.2016

Government is pleased to accord in-principle approval to the investment proposal of M/s IBN Sina Nature Cure Pvt. Ltd., to

establish a “Nature Cure Hospital”, with an investment of ` 211.24 crores, generating employment to about 385 persons at Hasaruvalli

Village, Thymagondlu Hobli, Nelamangala Taluk, Bengaluru Rural District with the following infrastructure assistances, incentives and

concessions.

Land

:

37 acres 33 guntas of land U/s 109 at Hasaruvalli Village, Thymagondlu Hobli, Nelamangala

Taluk, Bengaluru Rural District.

Water

:

60 KLPD Water from own sources.

Power

:

400 KVA from BESCOM.

Incentives &

Concessions

:

As per applicable policy of the State.

Sanction of the above infrastructure facilities, incentives and concessions is subject to the following terms and conditions:

1.

Environment: The company to obtain Consent for Establishment and Consent for Operation from KSPCB and environmental

clearance from MoEF, Govt. of India or the Dept of Forest, Ecology & Environment, Govt. of Karnataka, if applicable.

2.

Employment: The Company shall comply with the provisions of applicable policy of the State of Govt. of Karnataka with

respect to local employment on the project. Prepare a plan for development of Human Resources required for the project,

train local people. A copy of Human Resources Development plan shall be sent to the Commissioner for Industrial

Development & Director of Industries and Commerce for monitoring.

3.

Vendor Development: Wherever there is scope for vendor development for the project, the company shall prepare a vendor

development plan, develop local vendors and procure the required inputs, components and sub-assemblies from these local

vendor units. A copy of the vendor development plan shall be sent to the Commissioner for Industrial Development & Director

of Industries and Commerce for monitoring.

4.

Social Infrastructure Development: The Company is advised to take up social infrastructure development projects in the

vicinity of the proposed location of the unit and comply with the stipulation of Company Act, 2013. A copy of such projects

shall be sent to the Commissioner for Industrial Development & Director of Industries and Commerce for monitoring.

5.

Others:

a) The company shall adopt rainwater harvesting, waste water recycling and water conservation techniques. Zero discharge

facility should be adopted wherever applicable.

b) The company shall take all statutory and other necessary clearances from the competent authorities including Govt. of

India.

c) As part of “Ease of Doing Business” Government vide order No. CI 89 SPI 2013, Dated: 20.12.2014 has accorded

approval to operationalise e-Udyami Phase II for obtaining various clearances / approvals / licenses etc. through common

e-platform for the projects approved through District Level Single Window Clearance Committee (DLSWCC) or State

Level Single Window Clearance Committee (SLSWCC) or State High Level Clearance Committee (SHLCC) w.e.f.

01.01.2015.

d) The approvals / NOCs of following Departments have been covered under Phase II of e-Udyami.

I.

Karnataka Industrial Areas Development Board.

II.

Karnataka Small Scale Industries Development Corporation.

III.

Karnataka State Pollution Control Board.

IV.

Factories, Boilers, Industrial Safety and Health Department

V.

Industries and Commerce Department

VI.

Town Planning Department and Local Planning Authorities

VII.

Municipal Administration Department

VIII.

BESCOM/GESCOM/HESCOM/CESCOM/MESCOM

IX.

Karnataka State Fire and Emergency Services Department

X.

Water Resources Department

¨sÁUÀ 1

PÀ£ÁðlPÀ gÁdå¥ÀvÀæ, UÀÄgÀĪÁgÀ, d£ÀªÀj 26, 2017

61

e) The login and passwords which are used for filing application through e-Udyami Phase I are also applicable for filing

application through e-Udyami Phase II. E-Udyami Phase II web application may be accessed through

www.ebizkarnataka.gov.in and online application along with necessary documents may please be filed for any of above

Departments’ approval / NOCs.

f)

Karnataka Udyog Mitra (KUM) would provide the necessary escort services for the speedy implementation of your project.

You are requested to inform the progress made in the implementation of the project every quarter in the proforma.

This approval is valid for a period of two years from the date of issue of this Government Order.

P.R. 05

SC. 25

By Order and in the name of the Governor of Karnataka,

S. UMADEVI

Desk Officer (Technical Cell),

Commerce & Industries Department.

C0MMERCE & INDUSTRIES SECRETARIAT

Sub:

Approval to the proposal of M/s Bagmane Developers Pvt. Ltd., to establish a “IT/ITES SEZ”

at Doddenakundi Village, Bengaluru East Taluk, Bengaluru Urban District.

Read

1) Proceedings of the 30th Land Audit Committee (LAC) meeting held on 25.06.2016.

2) Proceedings of the 93rd State Level Single Window Clearance Committee (SLSWCC)

meeting held on 03.08.2016.

Preamble:

M/s Bagmane Developers Pvt. Ltd., has proposed to establish “IT/ITES SEZ”, with an investment of ` 300.5 crores, generating

employment to about 160 persons at 3 acres 12 guntas of own land at Sy.Nos.42/2, 42/3 of Doddenakundi Village, Bengaluru East

Taluk, Bengaluru Urban District.

In the 30th Land Audit Committee meeting held on 25.06.2016, the committee noted the land utilisation details. After detailed

discussions, the Committee resolved to recommend to SLSWCC for approval of the project to set up SEZ in 3 Acres 12 guntas of own

land at Sy. Nos. 42/2, 42/3 of Doddenakundi Village, Bengaluru East Taluk, Bengaluru Urban District, subject to obtaining necessary

clearances from BDA and KSPCB.

The proposal was examined & approved in the 93rd State Level Single Window Clearance Committee (SLSWCC) Meeting held on

03.08.2016. Government has examined the recommendations made by the State Level Single Window Clearance Committee in all

aspects.

Hence the following order.

GOVERNMENT ORDER No. CI 244 SPI 2016, BENGALURU, DATED: 31.08.2016

Government is pleased to accord in-principle approval to the investment proposal of M/s Bagmane Developers Pvt. Ltd., to

establish a “IT/ITES SEZ”, with an investment of ` 300.5 crores, generating employment to about 160 persons at 3 acres 12 guntas of

own land at Sy. Nos. 42/2, 42/3 of Doddenakundi Village, Bengaluru East Taluk, Bengaluru Urban District with the following

infrastructure assistances, incentives and concessions subject to obtaining necessary clearances from BDA and KSPCB:

Land

:

3 acres 12 guntas of own land at Sy. Nos.42/2, 42/3 of Doddenakundi Village, Bengaluru

East Taluk, Bengaluru Urban District.

Water

:

100 KLPD Water from own sources.

Power

:

8000 KVA from BESCOM.

Incentives &

Concessions

:

As per applicable policy of the State.

Sanction of the above infrastructure facilities, incentives and concessions is subject to the following terms and conditions:

1.

Environment: The company to obtain Consent for Establishment and Consent for Operation from KSPCB and environmental

clearance from MoEF, Govt. of India or the Dept of Forest, Ecology & Environment, Govt. of Karnataka, if applicable.

2.

Employment: The Company shall comply with the provisions of applicable policy of Govt. of Karnataka with respect to local

employment on the project. Prepare a plan for development of Human Resources required for the project, train local people.

A copy of Human Resources Development plan shall be sent to the Commissioner for Industrial Development & Director of

Industries and Commerce for monitoring.

3.

Vendor Development: Wherever there is scope for vendor development for the project, the company shall prepare a vendor

development plan, develop local vendors and procure the required inputs, components and sub-assemblies from these local

vendor units. A copy of the vendor development plan shall be sent to the Commissioner for Industrial Development & Director

of Industries and Commerce for monitoring.

62

PÀ£ÁðlPÀ gÁdå¥ÀvÀæ, UÀÄgÀĪÁgÀ, d£ÀªÀj 26, 2017

¨sÁUÀ 1

4.

Social Infrastructure Development: The Company is advised to take up social infrastructure development projects in the

vicinity of the proposed location of the unit and comply with the stipulation of Company Act, 2013. A copy of such projects

shall be sent to the Commissioner for Industrial Development & Director of Industries and Commerce for monitoring.

5.

Others:

a) The company shall adopt rainwater harvesting, waste water recycling and water conservation techniques. Zero

discharge facility should be adopted wherever applicable.

b) The company shall take all statutory and other necessary clearances from the competent authorities including Govt. of

India.

c) As part of “Ease of Doing Business” Government vide order No. CI 89 SPI 2013, Dated: 20.12.2014 has accorded

approval to operationalise e-Udyami Phase II for obtaining various clearances / approvals / licenses etc. through

common e-platform for the projects approved through District Level Single Window Clearance Committee (DLSWCC) or

State Level Single Window Clearance Committee (SLSWCC) or State High Level Clearance Committee (SHLCC) w.e.f.

01.01.2015.

d) The approvals / NOCs of following Departments have been covered under Phase II of e-Udyami.

i.

Karnataka Industrial Areas Development Board.

ii.

Karnataka Small Scale Industries Development Corporation.

iii.

Karnataka State Pollution Control Board.

iv.

Factories, Boilers, Industrial Safety and Health Department

v.

Industries and Commerce Department

vi.

Town Planning Department and Local Planning Authorities

vii.

Municipal Administration Department

viii.

BESCOM/GESCOM/HESCOM/CESCOM/MESCOM

ix.

Karnataka State Fire and Emergency Services Department

x.

Water Resources Department

e)

The login and passwords which are used for filing application through e-Udyami Phase I are also applicable for filing

application through e-Udyami Phase II. E-Udyami Phase II web application may be accessed through

www.ebizkarnataka.gov.in and online application along with necessary documents may please be filed for any of above

Departments’ approval / NOCs.

f)

Karnataka Udyog Mitra (KUM) would provide the necessary escort services for the speedy implementation of your project.

You are requested to inform the progress made in the implementation of the project every quarter in the proforma.

This approval is valid for a period of two years from the date of issue of this Government Order.

P.R. 06

SC. 25

By Order and in the name of the Governor of Karnataka,

S. UMADEVI

Desk Officer (Technical Cell),

Commerce & Industries Department.

C0MMERCE & INDUSTRIES SECRETARIAT

Sub:

Approval to the proposal of M/s Shahi Exports Pvt. Ltd., to establish a unit for “Weaving and

Processing” at Nidge Industrial Area, Shivamogga Taluk, Shivamogga District.

Read

1)

Proceedings of the 30th Land Audit Committee (LAC) meeting held on 25.06.2016.

2)

Proceedings of the 93rd State Level Single Window Clearance Committee (SLSWCC)

meeting held on 03.08.2016.

Preamble:

M/s Shahi Exports Pvt. Ltd., has proposed to establish a unit for “Weaving and Processing”, with an investment of ` 426.57

crores, generating employment to about 2000 persons at 33.17 acres of existing land in Nidge Industrial Area, Shivamogga Taluk,

Shivamogga District.

In the 30th Land Audit Committee meeting held on 25.06.2016, the committee noted the land utilization details. After detailed

discussions, the Committee resolved to recommend to SLSWCC for approval of the project to be set up in 33.17 Acres of their existing

own land at Nidge (General) Industrial Area, Shivamogga Taluk, Shivamogga District. The company to ensure zero discharge as per

KSPCB norms.

¨sÁUÀ 1

PÀ£ÁðlPÀ gÁdå¥ÀvÀæ, UÀÄgÀĪÁgÀ, d£ÀªÀj 26, 2017

63

The proposal was examined & approved in the 93rd State Level Single Window Clearance Committee (SLSWCC) Meeting held on

03.08.2016. Government has examined the recommendations made by the State Level Single Window Clearance Committee in all

aspects.

Hence the following order.

GOVERNMENT ORDER No. CI 243 SPI 2016, BENGALURU, DATED: 31.08.2016.

Government is pleased to accord in-principle approval to the investment proposal of M/s Shahi Exports Pvt. Ltd., to establish a

unit for “Weaving and Processing”, with an investment of ` 426.57 crores, generating employment to about 2000 persons at 33.17 acres

of existing land in Nidge (General) Industrial Area, Shivamogga Taluk, Shivamogga District with the following infrastructure assistances,

incentives and concessions:

Land

:

33.17 acres of existing land in Nidge Industrial Area Shivamogga Taluk, Shivamogga

District.

Water

:

2 KLPD water from KIADB.

Power

:

8000 KVA from MESCOM.

Incentives &

Concessions

:

As per Nuthana Javali Neethi 2013-18.

Sanction of the above infrastructure facilities, incentives and concessions is subject to the following terms and conditions:

1.

Environment: The company to obtain Consent for Establishment and Consent for Operation from KSPCB and environmental

clearance from MoEF, Govt. of India or the Dept of Forest, Ecology & Environment, Govt. of Karnataka, if applicable.

2.

Employment: The Company shall comply with the provisions of Nuthana Javali Neethi 2013–18 of Govt. of Karnataka with

respect to local employment on the project. Prepare a plan for development of Human Resources required for the project,

train local people. A copy of Human Resources Development plan shall be sent to the Commissioner for Industrial

Development & Director of Industries and Commerce for monitoring.

3.

Vendor Development: Wherever there is scope for vendor development for the project, the company shall prepare a vendor

development plan, develop local vendors and procure the required inputs, components and sub-assemblies from these local

vendor units. A copy of the vendor development plan shall be sent to the Commissioner for Industrial Development & Director

of Industries and Commerce for monitoring.

4.

Social Infrastructure Development: The Company is advised to take up social infrastructure development projects in the

vicinity of the proposed location of the unit and comply with the stipulation of Company Act, 2013. A copy of such projects

shall be sent to the Commissioner for Industrial Development & Director of Industries and Commerce for monitoring.

5.

Others

a) The company shall adopt rainwater harvesting, waste water recycling and water conservation techniques. Zero

discharge facility should be adopted wherever applicable.

b) The company shall take all statutory and other necessary clearances from the competent authorities including Govt.

of India.

c) As part of “Ease of Doing Business” Government vide order No. CI 89 SPI 2013, Dated: 20.12.2014 has accorded

approval to operationalise e-Udyami Phase II for obtaining various clearances / approvals / licenses etc. through

common e-platform for the projects approved through District Level Single Window Clearance Committee

(DLSWCC) or State Level Single Window Clearance Committee (SLSWCC) or State High Level Clearance

Committee (SHLCC) w.e.f. 01.01.2015.

d) The approvals / NOCs of following Departments have been covered under Phase II of e-Udyami.

xi.

Karnataka Industrial Areas Development Board.

xii.

Karnataka Small Scale Industries Development Corporation.

xiii.

Karnataka State Pollution Control Board.

xiv.

Factories, Boilers, Industrial Safety and Health Department

xv.

Industries and Commerce Department

xvi.

Town Planning Department and Local Planning Authorities

xvii.

Municipal Administration Department

xviii.

BESCOM/GESCOM/HESCOM/CESCOM/MESCOM

xix.

Karnataka State Fire and Emergency Services Department

xx.

Water Resources Department

64

PÀ£ÁðlPÀ gÁdå¥ÀvÀæ, UÀÄgÀĪÁgÀ, d£ÀªÀj 26, 2017

¨sÁUÀ 1

e) The login and passwords which are used for filing application through e-Udyami Phase I are also applicable for filing

application through e-Udyami Phase II. E-Udyami Phase II web application may be accessed through

www.ebizkarnataka.gov.in and online application along with necessary documents may please be filed for any of

above Departments’ approval / NOCs.

f)

Karnataka Udyog Mitra (KUM) would provide the necessary escort services for the speedy implementation of your

project. You are requested to inform the progress made in the implementation of the project every quarter in the

proforma.

This approval is valid for a period of two years from the date of issue of this Government Order.

P.R. 07

SC. 25

By Order and in the name of the Governor of Karnataka,

S. UMADEVI

Desk Officer (Technical Cell),

Commerce & Industries Department.

COMMERCE AND INDUSTRIES SECRETARIAT

Sub:

Approval to the proposal of M/s Infinite Tech-data Ltd. to establish “Software development centre”

at Hitech, Defence and Aerospace Park, Devanahalli, Bengaluru Rural District.

Read

1) Proceedings of the 30th Land Audit Committee (LAC) meeting held on 25.06.2016.

2) Proceedings of the 93rd State Level Single Window Clearance Committee (SLSWCC) meeting

held on 03.08.2016.

Preamble:

M/s Infinite Tech-data Ltd. has proposed to establish “Software development centre”, with an investment of `. 192.50 crores,

generating employment to about 1,295 persons at Hitech, Defence and Aerospace Park, Devanahalli, Bengaluru Rural District.

In the 30th Land Audit Committee meeting held on 25.06.2016, the Committee noted the decision of the 90th SLSWCC meeting

held on 01.02.2016 which is as follows:

“The Committee approved the project in-principle subject to scrutiny of background of the company and land requirement by the

Land Audit Committee after ascertaining concurrence of IT/BT Department”.

The Committee also noted the opinion from the Managing Director, IT/BT Department letter dated 24.05.2016 regarding

recommendation for allotment of 10 acres of land in IT Park, Devanahalli for the proposed project.

The Committee after detailed discussions cleared the project approved in the 90th SLSWCC meeting held on 01.02.2016 and

resolved to recommend to KIADB to allot 10 acres of land at Hitech, Defence and Aerospace Park, Devanahalli, Bengaluru Rural

District.

The proposal was examined & approved in the 93rd State Level Single Window Clearance Committee (SLSWCC) Meeting held on

03.08.2016. Government has examined the recommendations made by the State Level Single Window Clearance Committee in all

aspects.

Hence the following order.

GOVERNMENT ORDER No. CI 129 SPI 2016, BENGALURU, DATED: 19.09.2016

Government is pleased to accord in-principle approval to the investment proposal of M/s Infinite Tech-data Ltd. to establish

“Software development centre”, with an investment of `. 192.50 crores, generating employment to about 1,295 persons at Hitech,

Defence and Aerospace Park, Devanahalli, Bengaluru Rural District with the following infrastructure assistances, incentives and

concessions:

Land

:

KIADB to allot 10 acres of land at Hi-tech, Defence and Aerospace Park,

Devanahalli, Bengaluru

Water

:

80 KLPD from KIADB

Power

:

2000 KVA from BESCOM

Incentives &

Concessions

:

As per Karnataka i4 Policy

Sanction of the above infrastructure facilities, incentives and concessions is subject to the following terms and conditions:

1.

Environment: The company to obtain Consent for Establishment and Consent for Operation from KSPCB and environmental

clearance from MoEF, Govt. of India or the Dept of Forest, Ecology & Environment, Govt. of Karnataka, if applicable.

2.

Employment: The Company shall comply with the provisions of i4 Policy of Govt. of Karnataka with respect to local

employment on the project. Prepare a plan for development of Human Resources required for the project, train local people.

¨sÁUÀ 1

PÀ£ÁðlPÀ gÁdå¥ÀvÀæ, UÀÄgÀĪÁgÀ, d£ÀªÀj 26, 2017

65

A copy of Human Resources Development plan shall be sent to the Commissioner for Industrial Development & Director of

Industries and Commerce for monitoring.

3.

Vendor Development: Wherever there is scope for vendor development for the project, the company shall prepare a vendor

development plan, develop local vendors and procure the required inputs, components and sub-assemblies from these local

vendor units. A copy of the vendor development plan shall be sent to the Commissioner for Industrial Development & Director

of Industries and Commerce for monitoring.

4.

Social Infrastructure Development: The Company is advised to take up social infrastructure development projects in the

vicinity of the proposed location of the unit and comply with the stipulation of Company Act, 2013. A copy of such projects

shall be sent to the Commissioner for Industrial Development & Director of Industries and Commerce for monitoring.

5.

Others:

a) The company shall adopt rainwater harvesting, waste water recycling and water conservation techniques. Zero

discharge facility should be adopted wherever applicable

b) The company shall take all statutory and other necessary clearances from the competent authorities including Govt.

of India.

c) As part of “Ease of Doing Business” Government vide order No. CI 89 SPI 2013, Dated: 20.12.2014 has accorded

approval to operationalise e-Udyami Phase II for obtaining various clearances / approvals / licenses etc. through

common e-platform for the projects approved through District Level Single Window Clearance Committee

(DLSWCC) or State Level Single Window Clearance Committee (SLSWCC) or State High Level Clearance

Committee (SHLCC) w.e.f. 01.01.2015.

d) The approvals / NOCs of following Departments have been covered under Phase II of e-Udyami.

i.

Karnataka Industrial Areas Development Board.

ii.

Karnataka Small Scale Industries Development Corporation.

iii.

Karnataka State Pollution Control Board.

iv.

Factories, Boilers, Industrial Safety and Health Department

v.

Industries and Commerce Department

vi.

Town Planning Department and Local Planning Authorities

vii.

Municipal Administration Department

viii.

BESCOM/GESCOM/HESCOM/CESCOM/MESCOM

ix.

Karnataka State Fire and Emergency Services Department

x.

Water Resources Department

e) The login and passwords which are used for filing application through e-Udyami Phase I are also applicable for filing

application through e-Udyami Phase II. E-Udyami Phase II web application may be accessed through

www.ebizkarnataka.gov.in and online application along with necessary documents may please be filed for any of

above Departments’ approval / NOCs.

f)

Karnataka Udyog Mitra (KUM) would provide the necessary escort services for the speedy implementation of your

project. You are requested to inform the progress made in the implementation of the project every quarter in the

proforma.

This approval is valid for a period of two years from the date of issue of this Government Order.

P.R. 08

SC. 25

By Order and in the name of the Governor of Karnataka,

NAGARATHNAMMA .G

Desk Officer (Technical Cell) I/c,

Commerce & Industries Department.

ENERGY SECRETARIAT

Sub:

Constitution of “State Working Group Committee(SWG)”to Finalize the State Action Plan for

Renewable Energy and intern Implementation of India’s Renewable Electricity Roadmap 2030 of

NITI Aayog.

Read

1. Adviser (Energy) NITI Aayog,Government of India, Letter No.P-11071/16/2015-NRE (P&E)

Date: 12.08.2016.

2. Adviser (Energy) NITI Aayog, Government of India, Letter No.P-11071/16/2015-NRE (P&E)

Date: 02.11.2016.

66

PÀ£ÁðlPÀ gÁdå¥ÀvÀæ, UÀÄgÀĪÁgÀ, d£ÀªÀj 26, 2017

¨sÁUÀ 1

PREAMBLE:

Government of India, Ministry of New and Renewable Energy (MNRE) has fixed National target of 175GW Renewable Energy by

2022.NITI Aayog (then Planning Commission), with the support of CII and shakti sustainable Energy Foundation prepared a

“Renewable Electricity Roadmap 2030” which was launched at REINVEST, last year. To implement the RE-Roadmap 2030, two

Committees have been formed namely an “Advisory Board” under the Chairmanship of Vice Chairman, NITI Aayog and a “Steering

Committee” at the level of CEO, NITI Aayog. The Steering committee in its first meeting advice the States to formulate aState specific

working groups committee to facilitate and address the challenges faced for deployment of RE in the State.

The State Working Group will focus its work on supporting the preparation of the State Action Plan for Renewable Energy(RE) and

implementing the suggested action plan to achieve the state’s RE target by 2022 and beyond.

In the read (2) above Adviser (Energy), NITI Aayog, Government of India, has requested for constitution of the State Working Group

Committee (SWG) at the State level under the Chairmanship of Additional Chief Secretary(Energy), as anecessary step to achieve the

support of all the relevant stakeholders in the State Government, to achieve the specified target and goal.

Accordingly, Government has decided to constitute State Working Group Committee (SWG), Hence the following order.

GOVERNMENT ORDER NO EN 77 VSC 2016, BENGALURU DATE:19.12.2016.

In the circumstances explained in the preamble, Government is pleased to constitute a “State Working Group Committee

(SWG)” to finalize the State Action Plan for Renewable Energy and intern Implementation of India’s Renewable Electricity Roadmap

2030 of National Institution for Transforming India (NITI)Aayog, at the State Level with immediate effect and until further orders:-

1

The Additional Chief Secretary to Government, Energy Department

Chairman

2

Managing Director, KREDL

Member

3

Managing Director, PCKL

Member

4

Chief Executive Officer, KSPDCL

Member

5

Director (Transmission), KPTCL

Member

6

Director (Technical), KPCL

Member

7

Director (Technical), BESCOM

Member

8

Director (Technical), GESCOM

Member

9

Director (Technical), MESCOM

Member

10

Director (Technical), HESCOM

Member

11

Director (Technical), CESC

Member

9

Chief Engineer(Ele), SLDC

Member

10

Nominated Representative from KERC

Member

11

Nominated Representative from RE industry association(s)

Member

12

Nominated Representative from the NITI Aayog

Member

13

Nominated Representative from the CII

Member

14

General Manager, KREDL

Convener

The said committee shall:-

(a) Finalize the structure of the state action plan(SAP RE) with the consultants.

(b) Provide inputs and data on SAP RE as required by the consultants.

(c) Partner with the CII to organize stakeholder consultations for inputs on the SAP RE.

(d) Highlight some of the practices adopted under the broad has facilitated faster operations, grid integration, incentives and

concerns if any that has facilitated faster deployment of RE at the state.

(e) Extend support to CII and consultant to develop the template to review, monitor and identify areas to intervene by the

Centre and State Government to ensure faster deployment of RE.

P.R. 09

SC.10

By Order and in the name of the Governor of Karnataka,

A.A. CHAPPARBAND

Under Secretary to Government,

Energy Department.

¨sÁUÀ 1

PÀ£ÁðlPÀ gÁdå¥ÀvÀæ, UÀÄgÀĪÁgÀ, d£ÀªÀj 26, 2017

67

EAzsÀ£À ¸ÀaªÁ®AiÀÄ

«µÀAiÀÄ:

¸ËgÀ ¤Ãw 2014-21gÀ£ÀéAiÀÄ PÀ£ÁðlPÀ £À«ÃPÀj¸À§ºÀÄzÁzÀ EAzsÀ£À C©üªÀÈ¢Þ ¤AiÀÄ«ÄvÀ ¸ÀA¸ÉÜAiÀİè

¯ÁåAqï ¨ÁåAPï ¸Áܦ¸ÀĪÀ PÀÄjvÀÄ.

NzÀ¯ÁVzÉ:

1. ¸ËgÀ «zÀÄåvï ¤Ãw 2014-21 C¢ü¸ÀÆZÀ£É ¸ÀASÉå: EJ£ï 21 «J¸ï¹ 2014 ¢£ÁAPÀ: 22.05.2014.

2. PÀ£ÁðlPÀ ¨sÀÆPÀAzÁAiÀÄ C¢ü¤AiÀĪÀÄ (wzÀÄÝ¥Àr), 2015 (PÀ£ÁðlPÀ C¢ü¤AiÀĪÀÄ 2015 gÀ ¸ÀASÉå: 31).

3. PÀAzÁAiÀÄ E¯ÁSÉ ¸ÀÄvÉÆÛÃ¯É ¸ÀASÉå: Dgïr 69 J¯ïf¹ 2015 ¢£ÁAPÀ:01.12.2015.

¥Àæ¸ÁÛªÀ£É:

PÉÃAzÀæ ¸ÀPÁðgÀzÀ £ÀªÀ ªÀÄvÀÄÛ £À«ÃPÀj¸À§ºÀÄzÁzÀ EAzsÀ£À ªÀÄAvÁæ®AiÀĪÀÅ £ÁåµÀ£À¯ï ¸ÉÆÃ¯Ágï «ÄµÀ£ï PÁAiÀÄðPÀæªÀÄzÀr 100000MW

gÀµÀÄÖ ¸ÁªÀÄxÀåðzÀ ¸ËgÀ «zÀÄåvï AiÉÆÃd£ÉUÀ¼À£ÀÄß C£ÀĵÁ×£ÀUÉÆ½¸ÀĪÀ UÀÄj ºÉÆA¢gÀÄvÀÛzÉ. F PÁAiÀÄðPÀæªÀÄzÀr gÁdåPÉÌ ¸Àj¸ÀĪÀiÁgÀÄ

6000MW ¸ÁªÀÄxÀåðzÀ ¸ËgÀ «zÀÄåvï AiÉÆÃd£ÉUÀ¼À£ÀÄß C£ÀĵÁ×£ÀUÉÆ½¸ÀĪÀ UÀÄjAiÀÄ£ÀÄß ¤UÀ¢ü¥Àr¸À¯ÁVzÉ.

¸ÀPÁðgÀªÀÅ ¸ËgÀ «zÀÄåZÀÒQÛAiÀÄ£ÀÄß ¥ÉÆæÃvÁ컸À®Ä ºÁUÀÆ gÁdåPÉÌ PÉÃAzÀæ¢AzÀ ¤ÃrgÀĪÀ ¸ËgÀ «zÀÄåvï GvÁàzÀ£ÉAiÀÄ UÀÄjAiÀÄ£ÀÄß

¸Á¢ü¸À®Ä ªÉÄÃ¯É NzÀ¯ÁzÀ (1)gÀ°è ¸ËgÀ «zÀÄåvï ¤Ãw 2014-21C£ÀÄß eÁj ªÀiÁrgÀÄvÀÛzÉ. PÉæqÀ¯ï ªÀw¬ÄAzÀ FUÁUÀ¯Éà ¸Àj¸ÀĪÀiÁgÀÄ

2347ªÉÄ.ªÁå. ¸ÁªÀÄxÀåðzÀ (¥ÁªÀUÀqÀ ¸ÉÆÃ¯Ágï ¥ÁPïð M¼ÀUÉÆAqÀAvÉ) AiÉÆÃd£ÉUÀ¼À£ÀÄß ºÀAaPÉ ¤Ãr C£ÀĵÁ×£À PÁAiÀÄðªÀÅ ««zsÀ

ºÀAvÀUÀ¼À°è ¥ÀæUÀwAiÀİègÀÄvÀÛªÉ. E°èAiÀĪÀgÉUÉ 203ªÉÄ.ªÁå ¸ÁªÀÄxÀåðzÀ ¸ËgÀ «zÀÄåvï AiÉÆÃd£ÉUÀ¼ÀÄ ªÀiÁvÀæ C£ÀĵÁ×£ÀUÉÆArgÀÄvÀÛªÉ.

¸ËgÀ «zÀÄåvï WÀlPÀUÀ¼À£ÀÄß GvÉÛÃf¸ÀĪÀ ¸À®ÄªÁV ¤ÃwAiÀÄ PÀ®A (16), (17) ªÀÄvÀÄÛ (18) gÀ£ÀéAiÀÄ ¸ËgÀ «zÀÄåvï WÀlPÀUÀ¼À£ÀÄß ¸Áܦ¸ÀĪÀ

C©üªÀÈ¢ÞzÁgÀjUÉ ««zsÀ GvÉÛÃd£ÀUÀ¼À£ÀÄß WÉÆÃµÀuÉ ªÀiÁqÀ¯ÁVgÀÄvÀÛzÉ. ¸ËgÀ ¤ÃwAiÀÄ£ÀéAiÀÄ PÀAzÁAiÀÄ E¯ÁSÉUÉ ¸ÀA§A¢ü¹zÀAvÉ WÉÆÃ¶¹gÀĪÀ

GvÉÛÃd£ÀUÀ¼À ¸ÀA§AzsÀ FUÁUÀ¯Éà PÀAzÁAiÀÄ E¯ÁSÉgÀªÀgÀÄ ªÉÄÃ¯É NzÀ¯ÁzÀ (2) ªÀÄvÀÄÛ (3)gÀ°è PÀæªÀÄ PÉÊUÉÆArgÀÄvÁÛgÉ.

¸ËgÀ ¤ÃwAiÀÄ PÀ®A (18)gÀ°è “A separate dedicated cell with staff drawn from revenue dept shall be created in KREDL, to

ensure creation of Govt/Private land banks for development of solar projects on lease basis including formulation of

modalities, fees etc.,” EzÀgÀAvÉ PÀ£ÁðlPÀ £À«ÃPÀj¸À§ºÀÄzÁzÀ EAzsÀ£À C©üªÀÈ¢Þ ¤AiÀÄ«ÄvÀzÀ°è ¸ËgÀ «zÀÄåvï AiÉÆÃd£ÉUÀ¼À ¸ÁÜ¥À£ÉUÉ

C£ÀĪÀÅ ªÀiÁrPÉÆqÀĪÀ ¸ÀA§AzsÀ ¯ÁåAqï ¨ÁåAPïUÀ¼À£ÀÄß ¸Áܦ¸À®Ä GzÉÝò¸À¯ÁVzÉ.

PÀ£ÁðlPÀ ¸ÉÆÃ¯Ágï ¥ÀªÀgï qɪÀ¯É¥ïªÉÄAmï (KSPDCL) ¸ÀA¸ÉÜAiÀÄÄ gÁdåzÀ ¥ÁªÀUÀqÀ vÁ®ÆèPÀÄ, £ÁUÀ®ªÀÄrPÉ ºÉÆÃ§½AiÀÄ ªÁå¦ÛAiÀİè

¸ÉÆÃ¯Ágï ¥ÁPïð ¸Áܦ¸À®Ä D ªÀÄÆ®PÀ ¸ËgÀ «zÀÄåvï GvÁàzÀ£Á WÀlPÀUÀ¼À£ÀÄß C£ÀĵÁ×£ÀUÉÆ½¸ÀĪÀ ¤nÖ£À°è FUÁUÀ¯Éà ¨sÀÆ«ÄAiÀÄ£ÀÄß ¸ËgÀ

«zÀÄåvï AiÉÆÃd£ÉUÀ¼À C©üªÀÈ¢ÞUÁV PÀ£ÁðlPÀ ¨sÀÆ ¸ÀÄzsÁgÀuÁ C¢ü¤AiÀĪÀÄ, 1961gÀ ¥ÀæPÀgÀt 109gÀ ¥ÀæPÁgÀ ¤AiÀĪÀiÁ£ÀĸÁgÀ C£ÀĪÀÄwAiÀÄ£ÀÄß

¥ÀqÉzÀÄ, PÀ£ÁðlPÀ ¨sÀÆ ¸ÀÄzsÁgÀuÁ C¢ü¤AiÀĪÀÄzÀ£ÀéAiÀÄ CªÀ±ÀåPÀªÁVgÀĪÀ ±Á¸À£À§zÀÞ C£ÀÄªÉÆÃzÀ£ÉUÀ¼À£ÀÄß ¥ÀqÉzÀÄ ¸ËgÀ «zÀÄåvï WÀlPÀUÀ¼À£ÀÄß

¸Áܦ¸À®Ä d«ÄãÀÄUÀ¼À£ÀÄß UÀÄwÛUÉ DzsÁgÀzÀ ªÉÄÃ¯É ¥ÀqÉAiÀÄ®Ä PÀæªÀÄ PÉÊUÉÆArzÉ.

2021gÀ ªÉüÉUÉ ¸Àj¸ÀĪÀiÁgÀÄ 6000 ªÉÄ.ªÁå. ¸ÁªÀÄxÀåðzÀ AiÉÆÃd£ÉUÀ¼À£ÀÄß C£ÀĵÁ×£ÀUÉÆ½¸ÀĪÀ UÀÄj ºÉÆAzÀ¯ÁVzÀÄÝ, CzÀPÀÌ£ÀĸÁgÀªÁV

¸ËgÀ «zÀÄåvï C©üªÀÈ¢ÞzÁgÀjUÉ ºÀAaPÉ ¤ÃqÀ¯ÁVzÀÄÝ, AiÉÆÃd£ÉUÀ¼À£ÀÄß C£ÀĵÁ×£ÀUÉÆ½¸À®Ä SÁ¸ÀV ¨sÀÆ«ÄAiÀÄ£ÀÄß UÀÄwÛUÉ DzsÁgÀzÀ ªÉÄïÉ

SÁ¸ÀV C©üªÀÈ¢ÞzÁgÀjUÉ ¤ÃqÀ®Ä ¨sÀÆ ªÀiÁ°ÃPÀgÀÄ D¸ÀQÛ vÉÆÃgÀÄwÛ®è. DzÀgÉ ¨sÀÆ ªÀiÁ°ÃPÀgÀÄ ¸ÀPÁðj ¸ÁéªÀÄåzÀ ¸ÀA¸ÉÜUÉ ¸Àé-EZÉÒ¬ÄAzÀ

EAvÀºÀ ¨sÀÆ«ÄUÀ¼À£ÀÄß ¤ÃqÀ®Ä D¸ÀQÛ vÉÆÃgÀÄwÛgÀĪÀÅzÀÄ UÀªÀÄ£ÀPÉÌ §A¢gÀÄvÀÛzÉ.

PÉæqÀ¯ï ¸ÀA¸ÉÜAiÀÄÄ ¨sÀÆ ªÀiÁ°ÃPÀjAzÀ ¥ÀqÉ¢gÀĪÀ ¨sÀÆ«ÄUÉ f¯Áè¢üPÁj, f¯Áè PÀȶ C¢üPÁj ªÀÄvÀÄÛ ªÀåªÀ¸ÁÜ¥ÀPÀ ¤zÉÃð±ÀPÀgÀÄ, PÉæqÀ¯ï

gÀªÀgÀÄ CzsÀåAiÀÄ£À ªÀiÁr ªÁ¸ÀÛªÀ ¹Üw UÀªÀÄ£ÀzÀ°èlÄÖPÉÆAqÀÄ UÀÄwÛUÉ zÀgÀ ¤UÀ¢ ªÀiÁqÀĪÀÅzÀÄ.

SÁ¸ÀV C©üªÀÈ¢ÞzÁgÀjAzÀ ¸ËgÀ «zÀÄåvï AiÉÆÃd£ÉUÀ¼À£ÀÄß C£ÀĵÁ×£ÀUÉÆ½¸À®Ä C£ÀĪÀÅ ªÀiÁrPÉÆqÀĪÀ zÀȶ֬ÄAzÀ ºÁUÀÆ ¸ËgÀ

¤ÃwAiÀÄ£ÀéAiÀÄ PÀ®A (18)gÀ°è G¯ÉèÃT¹gÀĪÀAvÉ PÀAzÁAiÀÄ E¯ÁSÉAiÀÄ ¸ÀºÀPÁgÀzÉÆA¢UÉ PÉæqÀ¯ï ¸ÀA¸ÉÜAiÀÄÄ ¯ÁåAqï ¨ÁåAPï ¸Áܦ¸ÀĪÀ

GzÉÝñÀ¢AzÀ F PɼÀPÀAqÀAvÉ DzÉò¹zÉ.

¸ÀPÁðj DzÉñÀ ¸ÀASÉå: EJ£ï 66 «J¸ïE 2016, ¨ÉAUÀ¼ÀÆgÀÄ, ¢£ÁAPÀ: 05.10.2016

¥Àæ¸ÁÛªÀ£ÉAiÀÄ°è «ªÀj¹gÀĪÀ CA±ÀUÀ¼À »£À߯ÉAiÀİè, ¸ËgÀ ¤Ãw 2014-21gÀ£ÀéAiÀÄ, SÁ¸ÀV ¨sÀÆ«ÄUÀ¼À£ÀÄß ¸ËgÀ «zÀÄåvï GvÁàzÀ£Á

WÀlPÀUÀ¼À£ÀÄß C¼ÀªÀr¸ÀĪÀ GzÉÝñÀ¢AzÀ, PÀ£ÁðlPÀ ¨sÀÆ ¸ÀÄzsÁgÀuÁ C¢ü¤AiÀĪÀÄzÀ£ÀéAiÀÄ ±Á¸À£À§zÀÞ C£ÀÄªÉÆÃzÀ£ÉUÀ¼À £ÀAvÀgÀ PÉæqÀ¯ï ¸ÀA¸ÉÜAiÀÄÄ

UÀÄwÛUÉ DzsÁgÀzÀ ªÉÄÃ¯É d«ÄãÀÄUÀ¼À£ÀÄß ¥ÀqÉzÀÄ, ¸ÀzÀj ¨sÀÆ«ÄUÀ¼À£ÀÄß SÁ¸ÀV ¸ËgÀ «zÀÄåvï C©üªÀÈ¢ÞzÁgÀjUÉ ¤AiÀĪÀiÁ£ÀĸÁgÀ G¥À-UÀÄwÛUÉUÉ

¤ÃqÀ®Ä ¸ÀPÁðgÀªÀÅ C£ÀÄªÉÆÃ¢¹zÉ.

¨sÀÆ ªÀiÁ°ÃPÀjUÉ UÀÄwÛUÉ ±ÀĮ̪À£ÀÄß ¸ÀA§A¢ü¹zÀ f¯Áè¢üPÁjAiÀÄÄ ¤UÀ¢ ªÀiÁqÀĪÀÅzÀÄ.

P.R. 10

SC. 10

PÀ£ÁðlPÀ gÁdå¥Á®gÀ DzÉñÁ£ÀĸÁgÀ ªÀÄvÀÄÛ CªÀgÀ ºÉ¸Àj£À°è,

J.J.ZÀ¥ÀàgÀ§Azï

¸ÀPÁðgÀzÀ C¢üãÀ PÁAiÀÄðzÀ²ð

EAzsÀ£À E¯ÁSÉ.

68

PÀ£ÁðlPÀ gÁdå¥ÀvÀæ, UÀÄgÀĪÁgÀ, d£ÀªÀj 26, 2017

¨sÁUÀ 1

ENERGY SECRETARIAT

Sub:

Purchase of Power from Sugar factories having Bagasse Based Co-Generation units, without

subsisting PPA.

PREAMBLE:

1.

Sugar factories have established Co-Generation units which can produce power using Bagasse and also coal. The power

generated by Co-Generation units is used in the operations of the sugar factories. Some sugar factories which have very

large crushing capacity, have established Co-Generation units which have got exportable surplus during the crushing season.

Some of the factories have entered into long term power purchase agreements (PPAs) with the Electricity Supply Companies

in the State. Many of the sugar factories have not entered into PPA's with ESCOMs, but have been selling their exportable

surplus power either on open access or through power exchange. Whenever there is severe power crisis the State

Government has also been imposing restrictions on sale of power by the sugar factories by invoking powers under Sec.11 of

the Electricity Act and forcing them to sell to the ESCOMS in the State.

2.

The sugar factories are located within the State and are purchasing sugar cane from the farmers. In the recent past, the

sugar factories have been facing difficulties in payment to the farmers and State Government is also giving a number of

financial concessions. If the power is purchased on a continuous basis then it will help the sugar factories to make payments

to the farmers.

3.

There are 65 sugar factories in the State, out of which 52 factories have Co-Generation units. Out of these, 11 sugar factories

have already entered into long term PPAs with ESCOMS. As per the proposal given by the South India Sugar Mills

Association, 28 sugar factories with an exportable capacity of 501 MWs are willing to enter into PPA with the ESCOMS.

4.

The power from the Co-Generation units produced during the crushing season which is from November to May coincides

with the peak demand in the State.

5.

It is proposed to allow ESCOMS to purchase power from sugar factories which are Co-Generation units, at the tariff fixed by

Karnataka Electricity Regulatory Commission (KERC) for the medium term of five years, starting from the year 2016-17. This

will be applicable to those sugar factories which are already generating power but do not have PPA's.

6.

This will not be applicable to new Bagasse based Co-Generation Sugar factories. The existing policy and guidelines of KERC

will apply to such units.

7.

This subject was placed before 25th Cabinet Meeting held on dt: 09.11.2016 under the subject No. C: 545/2016 and got the

approval of the Cabinet.

8.

As a matter of policy, it is in the interest of public, farmers of the State and also to improve the availability of power in the

State, it is proposed to purchase power from Sugar factories having Bagasse based Co-Generation Units without subsisting

PPA’s. Hence this Order.

GOVERNMENT ORDER NO. EN 16 PPT 2016, BENGALURU, DATED: 11 NOVEMBER, 2016

In the circumstances explained in the preamble, the State Government hereby accord approval to purchase power from

Bagasse Based Co-Generation Units of sugar factories in the State with the approval of KERC, for a period of five years commencing

from 2016-17, at the tariff determined by KERC with the following conditions:

i.

The power generation should be only from Bagasse.

ii.

This will be applicable to Co-Generation units which are already generating power but do not have PPA's with the

ESCOM's.

iii.

The Sugar Factories interested to sell the power to the ESCOMS as per this G.O. should sign the PPA with in

one week of Karnataka Electricity Regulatory Commission approval.

iv.

The Sugar Factories should not violate the Karnataka Sugarcane (Regulation of Purchase and Supply) Act,

2013.

v.

For the New Bagasse Based Co-Generation Units which are going to start Generation, the existing guidelines

and policy will apply.

vi.

Energy pumped by Generators under the PPA as per this order shall be allocated amongst ESCOMs as per the

existing Govt. Order dated: 05.09.2015 or the Govt. Orders to be issued from time to time in future.

vii.

The Generators shall raise the bills as per the Govt. Order dated: 05.09.2015 to the respective ESCOMs.

P.R. 11

SC.50

By Order and in the name of the Governor of Karnataka,

A.A. CHAPPARBAND

Under Secretary to Government,

Energy Department.

ªÀÄÄzÀæPÀgÀÄ ºÁUÀÆ ¥ÀæPÁ±ÀPÀgÀÄ:- ¸ÀAPÀ®£Á¢üPÁjUÀ¼ÀÄ, PÀ£ÁðlPÀ gÁdå¥ÀvÀæ, ¸ÀPÁðj PÉÃAzÀæ ªÀÄÄzÀæuÁ®AiÀÄ, ¨ÉAUÀ¼ÀÆgÀÄ-59.

R.N.I. No. KARBIL/2001/47147 POSTAL REGN. No. RNP/KA/BGS/2202/2017-19

Licensed to post without prepayment WPP No. 297