Sub:
Constitution of State Project Management Unit for the Integrated Coastal Zone
Management Project Phase-II (ICZMP Phase-II) with the World Bank Assistance –reg.
Read:
1.
Proceedings of the meeting held under the chairmanship of the Additional Chief
Secretary to Government, Forest, Ecology and Environment Department on
22.09.2015 at Vikasa Soudha, Bengaluru.
2.
Minutes of the meeting on ICZMP Phase-II held on 08.01.2018 in the MoEF & CC,
New Delhi.
PREAMBLE:
The Ministry of Environment, Forests and Climate Change (MoEF & CC) Government of India has identified Karnataka State
for the proposed Integrated Coastal Zone Management Project (ICZMP) Phase-II assisted by the Ministry and the World Bank. The
overall objective of the project is to build sustainable management of coastal resources to provide sustained livelihood security for the
coastal population.
The Government of India has allocated a budget outlay of `. 310 Crores to the State, out of which the State Government
contribution is 20%. The duration of the project is 6 years (2019-25) involving, two stages of 4 years each with an overlap of 2 years
between the two stages. In the First Stage, the project will be implemented in Mangaluru, Kundapura and Kumta Taluks of Dakshina
Kannada, Udupi and Uttara Kannada districts respectively.
As per the minutes of the meeting held at Ministry of Environment, Forest and Climate Change cited at ref (2) above, a Nodal
agency called State Project Monitoring Unit has to be established under the Department of Forest, Ecology and Environment,
Government of Karnataka for smooth implementation of the project, which should be a registered society under the Karnataka Societies
Registration Act, 1960. Accordingly, it is proposed to establish State Project Management Unit under Integrated Coastal Zone
Management Society -Karnataka which is a registered Society with head quarters at Mangaluru. In order to implement the project
smoothly, it is proposed to have following staff composition for the State Project Monitoring Unit (SPMU).
State Project Management Unit (SPMU), Integrated Coastal Zone Management Project (ICZMP) Phase-II, Mangaluru
Sl.
No.
Designation
Qualification /Experience
On Deputation /
Contractual Basis
1
Project Director
Indian
Forest
Service
Officer
-
Chief
Conservator of Forests Rank and above
On Deputation basis
2
Additional Project Director (APD)
Indian Forest Service Officer - Conservator of
Forests Rank and above
On Deputation basis
3
Administrative Officer
cum Procurement Officer
KAS – Junior Scale
On Deputation basis
¸ÀA¥ÀÄl 153
Volume 153
¨ÉAUÀ¼ÀÆgÀÄ, UÀÄgÀĪÁgÀ, ªÉÄà 31, 2018 (eÉåõÀ× 10, ±ÀPÀ ªÀµÀð 1940)
Bengaluru, Thursday, May 31, 2018 (Jyeishta 10, Shaka Varsha 1940)
¸ÀAaPÉ 22
Issue 22
604
PÀ£ÁðlPÀ gÁdå¥ÀvÀæ, UÀÄgÀĪÁgÀ, ªÉÄà 31, 2018
¨sÁUÀ 1
Sl.
No.
Designation
Qualification /Experience
On Deputation /
Contractual Basis
4
Account Officer
Joint Director (Finance)
State Accounts Department
on Deputation
5
Programme Manager
(Planning)
Assistant Director of Urban Planning
Urban Development
Department on Deputation
6
Programme Manager (Fisheries)
Deputy Director of Fisheries from the State
Fisheries Department or Academicians of the
rank of Assistant Professors and above
from any universities in the relevant field.
Fisheries
Department
or
University
7
Programme Manager (Ecologist)
MSc/Botony/Zoology/Marine/ Biology/Ecology
On Contract Basis
8
Programme Manager
(Rural Development)
MSW/MA in Sociology
On Contract Basis
9
Programme Manager
(Communication & Capacity Building)
Post Graduation in Journalism and Mass
Communication
On Contract Basis
10
Programme Manager (MIS)
GIS/MIS Expert
On Contract Basis
The overall objective of the Integrated Coastal Zone Management Project (ICZMP) Phase-II - Karnataka is to promote the
sustainable management of the natural and physical resources of the coastal environment. The State Project Management Unit
(SPMU) is established under Integrated Coastal Zone Management Society (ICZMS) –Karnataka to Co-ordinate all the project activities.
The Unit will be headed by a Project Director (PD) under the supervision of Steering Committee and ICZMP Phase II. Hence the
following order.
GOVERNMENT ORDER NO: FEE 17 CRZ 2018, BENGALURU, DATED: 20-04-2018
Pursuant to the facts and the circumstances explained in the preamble, the Government is pleased to constitute the State
Project Management Unit (SPMU), under Integrated Coastal Zone Management Society (ICZMS) – Karnataka with the following
composition for implementation of ICZMP Phase-II with its Head Quarters at Mangaluru.
State Project Management Unit (SPMU), Integrated Coastal Zone Management Project (ICZMP) Phase-II, Mangaluru
Sl.
No.
Designation
Qualification /Experience
On Deputation /
Contractual Basis
1
Project Director
Indian
Forest
Service
Officer
-
Chief
Conservator of Forests Rank and above
On Deputation basis
2
Additional Project Director (APD)
Indian Forest Service Officer - Conservator of
Forests Rank and above
On Deputation basis
3
Administrative Officer
cum Procurement Officer
KAS – Junior Scale
On Deputation basis
4
Account Officer
Joint Director (Finance)
State Accounts Department
on Deputation
5
Programme Manager
(Planning)
Assistant Director of Urban Planning
Urban
Development
Department on Deputation
6
Programme Manager (Fisheries)
Deputy Director of Fisheries from the State
Fisheries Department or Academicians of the
rank of Assistant Professors and above
from any universities in the relevant field.
Fisheries
Department
or
University
7
Programme Manager (Ecologist)
MSc/Botony / Zoology/Marine/
Biology/Ecology
On Contract Basis
8
Programme Manager
(Rural Development)
MSW/MA in Sociology
On Contract Basis
9
Programme Manager
(Communication & Capacity Building)
Post Graduation in Journalism and Mass
Communication
On Contract Basis
10
Programme Manager (MIS)
GIS/MIS Expert
On Contract Basis
The Unit shall undertake the following activities :-
¨sÁUÀ 1
PÀ£ÁðlPÀ gÁdå¥ÀvÀæ, UÀÄgÀĪÁgÀ, ªÉÄà 31, 2018
605
1)
To interact among the State Departments and participating Agencies, Ministry of Environment, Forest and Climate Change,
Government of India, World Bank and the Consultants and Experts for the implementation of the project in the State
Government.
2)
To Co-ordinate in preparation and submission of all financial proposals from the State to MoEF&CC and obtain funds for
distribution to state implementing Departments of the State Government.
3)
To render periodical progress reports expenditure statements etc. to MoEF &CC / World Bank
4)
To organise regular monitoring and evaluation for all components of the Project
5)
To organise periodical review meetings including meetings of Steering Committee of the project and take follow up action on
the recommendations made by the Committee
6)
To organise camps, exposure visits, training etc. for capacity building and orientation of implementing Departments /
Agencies, Coastal Community and NGOs
7)
To prepare documents, compilation and analysis of relevant data, publicity of Project activity, and creation of awareness
among public on positive impact of the project
8)
To organise scientific studies for future management of coastal region
9)
To Co-ordinate in preparation of interim and completion report for all components of the Project.
10) Any other activities which is included in the Detailed Project Reports (DPR)
This issues with the Finance Department concurrence provided Vide Note No. FD 229 exp-5/2018, dated: 26.03.2018.
P.R. 304
SC. 200
By Order and in the name of the Governor of Karnataka,
H C Rajendra Kumar
Under Secretary to Government (I/c),
(Ecology and Environment)
Forest, Ecology and Environment Department.
G£ÀßvÀ ²PÀët ¸ÀaªÁ®AiÀÄ
«µÀAiÀÄ :-
qÁ:
¥ÉæÃªÀÄPÀĪÀiÁgï
EªÀgÀ
ºÀÄzÉÝAiÀÄ
«°Ã£À
ºÁUÀÆ
¥ÀzÉÆÃ£ÀßwAiÀÄ£ÀÄß
¤AiÀĪÀĨÁ»gÀªÁV ªÀÄAdÆgÀÄ ªÀiÁrgÀĪÀ §UÉÎ.
NzÀ¯ÁVzÉ :-
1.
¸ÀPÁðgÀzÀ PÁgÀt PÉüÀĪÀ £ÉÆÃnÃ¸ï ¸ÀASÉå: Er 590 AiÀÄÄJ£ïE 2014,
¢£ÁAPÀ: 04-02-2015.
2.
PÀÄ®¸ÀaªÀgÀÄ, eÁ£À¥ÀzÀ «±Àé«zÁå®AiÀÄ, EªÀgÀ ¥ÀvÀæ ¸ÀA. PÀeÁ««/D«/PÀæªÀiÁAPÀ,
¢£ÁAPÀ: 18-02-2015.
¥Àæ¸ÁÛªÀ£É :-
ªÉÄÃ¯É NzÀ¯ÁzÀ (1)gÀ ¸ÀPÁðgÀzÀ PÁgÀt PÉüÀĪÀ £ÉÆÃn¸ï£À°è qÁ. ¥ÉæÃªÀiïPÀĪÀiÁgï EªÀgÀ£ÀÄß PÀ£ÁðlPÀ eÁ£À¥ÀzÀ «±Àé«zÁå®AiÀÄzÀ
eÁ£À¥ÀzÀ ¨sÁµÁAvÀgÀ PÉÃAzÀæzÀ qÉÊgÉPÀÖgï PÀA ¥ÁæzsÁå¥ÀPÀgÀ ºÀÄzÉÝAiÀÄ°è «°Ã£ÀUÉÆ½¸À®Ä ¢£ÁAPÀ: 11-04-2015gÀAzÀÄ £ÀqÉzÀ ¹ArPÉÃmï
¸À¨sÉAiÀİè wêÀiÁð¤¸À¯ÁVzÉ. ¸ÀzÀj wêÀiÁð£ÀªÀÅ F PɼÀV£À PÁgÀtUÀ½AzÀ ¤AiÀĪÀĨÁ»gÀªÁVzÉ.
(1)
qÁ: ¥ÉæÃªÀÄPÀĪÀiÁgï PÉ. EªÀgÀ£ÀÄß ¸ÀPÁðgÀzÀ C£ÀÄªÉÆÃzÀ£É ¥ÀqÉzÀÄ ¤AiÉÆÃd£É ªÉÄÃgÉUÉ PÀ£ÀßqÀ
«±Àé«zÁå®AiÀÄ¢AzÀ eÁ£À¥ÀzÀ «±Àé«zÁå®AiÀÄPÉÌ £ÉëĸÀ¯ÁVvÀÄÛ. DzÀgÉ, ¸ÀPÁðgÀzÀ C£ÀÄªÉÆÃzÀ£É ¥ÀqÉAiÀÄzÉÃ
PÀ£ÀßqÀ «±Àé«zÁå®AiÀÄ¢AzÀ C£ÀÄªÉÆÃzÀ£É ¥ÀqÉzÀÄ ¸ÀzÀjAiÀĪÀgÀ£ÀÄß eÁ£À¥ÀzÀ «±Àé«zÁå®AiÀÄzÀ°è
«°Ã£ÀUÉÆ½¸À¯ÁVzÉ.
(2)
¸ÀzÀjAiÀĪÀgÀÄ PÀ£ÀßqÀ «±Àé«zÁå®AiÀÄzÀ°è G¥ÀPÀÄ®¸ÀaªÀgÁVzÀÄÝ (¨ÉÆÃzsÀPÉÃvÀgÀ), eÁ£À¥ÀzÀ «±Àé«zÁå®AiÀÄzÀ°è
¥ÁæzsÁå¥ÀPÀgÀ ºÀÄzÉÝAiÀÄ£ÀÄß ¤ÃqÀ®Ä ¢:11-04-2014gÀ ¹ArPÉÃmï ¸À¨sÉAiÀÄÄ wêÀiÁð¤¸À¯ÁVzÉ. ¸ÀPÁðgÀzÀ
¤AiÀĪÀÄUÀ¼À°è ¨ÉÆÃzsÀPÉÃvÀgÀ ºÀÄzÉݬÄAzÀ ¨ÉÆÃzsÀPÀ ºÀÄzÉÝUÉ «°Ã£ÀUÉÆ½¸ÀĪÀ CªÀPÁ±À«gÀĪÀÅ¢®è.
(3)
¸ÀPÁðj DzÉñÀ ¸ÀA. Er 251 AiÀÄÄJ£ïE 2011, ¢£ÁAPÀ 16-04-2012gÀ°è ¸ÀPÁðgÀªÀÅ eÁ£À¥ÀzÀ
«±Àé«zÁå®AiÀÄzÀ ««zsÀ ¨ÉÆÃzsÀPÀ ªÀÄvÀÄÛ ¨ÉÆÃzsÀPÉÃvÀgÀ ºÀÄzÉÝUÀ¼À£ÀÄß ¨sÀwð ªÀiÁqÀ®Ä C£ÀÄªÉÆÃzÀ£É
¤ÃqÀ¯ÁVzÉ. EzÀgÀ°è ªÀÄÆgÀÄ ¥ÁæzsÁå¥ÀPÀgÀ ºÀÄzÉÝUÀ¼ÀÄ ¸ÉÃjgÀÄvÀÛªÉ. F ªÀÄÆgÀÄ ºÀÄzÉÝUÀ½UÉ CfðUÀ¼À£ÀÄß
DºÁ餹, ¸ÀÆPÀÛ C¨sÀåyðUÀ¼À£ÀÄß ¸ÀAzÀ±Àð£ÀzÀ ªÀÄÆ®PÀ ¤AiÀĪÀiÁ£ÀĸÁgÀ ¨sÀwð ªÀiÁrPÉÆ¼Àî¨ÉÃPÁVzÀÄÝ, DzÀgÉ,
EzÀgÀ°è MAzÀÄ ºÀÄzÉÝAiÀÄ£ÀÄß, «±Àé«zÁå®AiÀÄzÀ eÁ£À¥ÀzÀ ¨sÁµÁAvÀgÀ PÉÃAzÀæzÀ qÉÊgÉPÀÖgï PÀA ¥ÁæzsÁå¥ÀPÀgÀ
ºÀÄzÉÝAiÉÄAzÀÄ ¥ÀzÀ£Á«ÄÃPÀj¹ ²æÃ ¥ÉæÃªÀÄPÀĪÀiÁgï EªÀjUÉ «ÄøÀ°lÄÖ, ¸ÀzÀj ºÀÄzÉÝUÉ ²æÃAiÀÄÄvÀgÀ£ÀÄß
«°Ã£ÀUÉÆ½¸À¯ÁVzÉ JAzÀÄ ¢£ÁAPÀ: 11-04-2014gÀ ¹ArPÉÃmï ¸À¨sÉAiÀÄ wêÀiÁð£ÀzÀ°è PÀAqÀÄ §gÀÄvÀÛzÉ.
EzÀÄ ªÀÄÄPÀÛ ¸ÀàzsÁð ¹zÁÞAvÀPÉÌ «gÀÄzÀÞªÁVgÀÄvÀÛzÉ.
606
PÀ£ÁðlPÀ gÁdå¥ÀvÀæ, UÀÄgÀĪÁgÀ, ªÉÄà 31, 2018
¨sÁUÀ 1
(4)
¤AiÉÆÃd£É ªÉÄÃgÉUÉ £ÉëĹgÀĪÀ ¸ÀzÀjAiÀĪÀgÀ£Éà ¥Àæ¨sÁj ¤zÉÃð±ÀPÀgÀ£ÁßV ªÀiÁqÀ¯ÁVzÉ £ÀAvÀgÀ ¨sÁµÁAvÀgÀ
PÉÃAzÀæzÀ qÉÊgÉPÀÖgï PÀA ¥ÁæzsÁå¥ÀPÀgÀ ºÀÄzÉÝUÉ «°Ã£ÀUÉÆ½¸À¯ÁVzÉ. M§â ¸ÀPÁðj £ËPÀgÀjUÉ F vÀgÀºÀ ¸Ë®¨sÀå
¤ÃqÀĪÀ CªÀ±ÀåPÀvÉ PÀAqÀÄ §gÀĪÀÅ¢®è.
¸ÀzÀj ¹ArPÉÃmï ¸À¨sÉAiÀÄ°è ¤AiÀĪÀĨÁ»gÀ wêÀiÁð£À vÉUÉzÀÄPÉÆAqÀ PÁgÀtPÁÌV PÀ£ÁðlPÀ «±Àé«zÁå®AiÀÄzÀ C¢ü¤AiÀĪÀÄ, 2011gÀ
¥ÀæPÀgÀt 8 gÀ£ÀéAiÀÄ KPÉ gÀzÀÄÝUÉÆ½¸À¨ÁgÀzÉA§ÄzÀPÉÌ «ªÀgÀuÉ ¤ÃqÀĪÀAvÉ PÀÄ®¸ÀaªÀjUÉ PÉÆÃgÀ¯ÁV, ªÉÄÃ¯É NzÀ¯ÁzÀ (2)gÀ ¥ÀvÀæzÀ°è
PÀÄ®¸ÀaªÀgÀÄ,
eÁ£À¥ÀzÀ
«±Àé«zÁå®AiÀÄ
EªÀgÀÄ
«ªÀgÀuÉAiÀÄ£ÀÄß
¤ÃrgÀÄvÁÛgÉ.
qÁ:
¥ÉæÃªÀÄPÀĪÀiÁgï
EªÀgÀ£ÀÄß
¥Àæ¨sÁj
¤zÉÃð±ÀPÀgÀ£ÁßV ªÀiÁqÀ¯ÁzÀ £ÀAvÀgÀ ¨sÁµÁAvÀgÀ PÉÃAzÀæzÀ qÉÊgÉPÀÖgï PÀA ¥ÁæzsÁå¥ÀPÀgÀ ºÀÄzÉÝUÉ «°Ã£ÀUÉÆ½¸À®Ä PÀÄ®¥ÀwUÀ¼ÀÄ, PÀ£ÁðlPÀ
eÁ£À¥ÀzÀ «±Àé«zÁå®AiÀÄ EªÀgÀ MvÁÛAiÀÄ ¥ÀƪÀðPÀªÁV PÀæªÀÄ PÉÊUÉÆ¼Àî¯ÁVzÉ JAzÀÄ w½¸ÀÄvÁÛ, PÀ£ÁðlPÀ eÁ£À¥ÀzÀ «±Àé«zÁå®AiÀÄzÀ
C¢ü¤AiÀĪÀÄ 2011gÀ ¥ÀæPÀgÀt 8gÀ£ÀéAiÀÄ ¹ArPÉÃmï£À wêÀiÁð£ÀzÀ PÀÄjvÀÄ ¸ÀÆPÀÛ ¤tðAiÀĪÀ£ÀÄß ¸ÀPÁðgÀªÀÅ vÉUÉzÀÄPÉÆ¼ÀÀÄzÁVzÉ JAzÀÄ
w½¹gÀÄvÁÛgÉ.
ªÉÄîÌAqÀ J¯Áè CA±ÀUÀ¼À£ÀÄß PÀÄ®APÀƵÀªÁV ¥Àj²Ã°¸À¯Á¬ÄvÀÄ. CzÀgÀAvÉ, F PɼÀPÀAqÀ DzÉñÀ.
¸ÀPÁðj DzÉñÀ ¸ÀASÉå : Er 590 AiÀÄÄJ£ïE 2014, ¨ÉAUÀ¼ÀÆgÀÄ ¢£ÁAPÀ : 07-05-2015
¥Àæ¸ÁÛªÀ£ÉAiÀÄ°è «ªÀj¹gÀĪÀ CA±ÀUÀ¼À »£É߯ÉAiÀİè, qÁ: ¥ÉæÃªÀiïPÀĪÀiÁgï EªÀgÀ£ÀÄß PÀ£ÁðlPÀ eÁ£À¥ÀzÀ «±Àé«zÁå®AiÀÄzÀ eÁ£À¥ÀzÀ
¨sÁµÁAvÀgÀ PÉÃAzÀæzÀ qÉÊgÉPÀÖgï PÀA ¥ÁæzsÁå¥ÀPÀgÀ ºÀÄzÉÝAiÀÄ°è «°Ã£ÀUÉÆ½¸À®Ä ¢£ÁAPÀ: 11-04-2014gÀAzÀÄ vÉUÉzÀÄPÉÆAqÀ ¹ArPÉÃmï ¸À¨sÉAiÀÄ
«µÀAiÀÄ ¸ÀÆa-9gÀ ¤tðAiÀĪÀÅ PÁ£ÀÆ£ÀÄ «gÀÄzÀÞªÁVgÀÄvÀÛzÉ.
DzÀÝjAzÀ, PÀ£ÁðlPÀ eÁ£À¥ÀzÀ «±Àé«zÁå®AiÀÄzÀ C¢ü¤AiÀĪÀÄ 2011gÀ ¥ÀæPÀgÀt 8gÀ£ÀéAiÀÄ ¢£ÁAPÀ: 11-04-2014 gÀAzÀÄ £ÀqÉzÀ
¹ArPÉÃmï ¸À¨sÉAiÀÄ «µÀAiÀÄ ¸ÀÆa-9 gÀ ¤tðAiÀĪÀ£ÀÄß ¸ÀPÁðgÀªÀÅ F PÀÆqÀ¯Éà eÁjUÉ §gÀĪÀAvÉ gÀzÀÄÝUÉÆ½¸À¯ÁVzÉ. qÁ: ¥ÉæÃªÀÄPÀĪÀiÁgï
EªÀgÀ£ÀÄß ¸ÀPÁðgÀzÀ ¥ÀvÀæ ¸ÀASÉå: Er 13 PÉ«« 2012, ¢£ÁAPÀ: 04-07-2012 gÀ°è PÀ£ÀßqÀ «±Àé«zÁå®AiÀÄ, ºÀA¦ EAzÀ PÀ£ÁðlPÀ eÁ£À¥ÀzÀ
«±Àé«zÁå®AiÀÄPÉÌ ¤AiÉÆÃd£É ªÉÄÃ¯É ºÉÆgÀr¹gÀĪÀ DzÉñÀªÀ£ÀÄß »A¥ÀqÉAiÀÄÄvÁÛ, ¸ÀzÀjAiÀĪÀgÀ ¸ÉêÉAiÀÄ£ÀÄß ªÀiÁvÀÈ E¯ÁSÉAiÀiÁzÀ PÀ£ÀßqÀ
«±Àé«zÁå®AiÀÄ, ºÀA¦ E°èUÉ »A¢gÀÄV¸À¯ÁVzÉ.
F ¸ÀA§AzsÀ ¤AiÀĪÀĨÁ»gÀªÁV ¸ÀzÀjAiÀĪÀjUÉ AiÀÄÄf¹ ªÉÃvÀ£ÀªÀ£ÀÄß «¸ÀÛj¹gÀĪÀÅzÀjAzÀ ¸ÀPÁðgÀPÉÌ GAmÁVgÀĪÀ £ÀµÀÖªÀ£ÀÄß
¸ÀzÀjAiÀĪÀjAzÀ ªÀ¸Àư ªÀiÁqÀ®Ä ªÀÄvÀÄÛ F §UÉÎ vÉUÉzÀÄPÉÆAqÀ PÀæªÀÄzÀ §UÉÎ ¸ÀPÁðgÀPÉÌ F DzÉñÀ ºÉÆgÀr¹zÀ MAzÀÄ ªÁgÀzÉÆ¼ÀUÉ ªÀgÀ¢
¤ÃqÀĪÀÅzÀÄ.
P.R. 305
SC. 50
PÀ£ÁðlPÀ gÁdå¥Á®gÀ DeÁÕ£ÀĸÁgÀ ªÀÄvÀÄÛ CªÀgÀ ºÉ¸Àj£À°è,
¸ÀAzsÁå J¯ï. £ÁAiÀÄPï
¸ÀPÁðgÀzÀ C¢üãÀ PÁAiÀÄðzÀ²ð,
G£ÀßvÀ ²PÀët E¯ÁSÉ («±Àé«zÁ央AiÀÄUÀ¼ÀÄ).
¹§âA¢ ªÀÄvÀÄÛ DqÀ½vÀ ¸ÀÄzsÁgÀuÉ ¸ÀaªÁ®AiÀÄ
¸ÉÃ¥ÀðqÉ DzÉñÀ
¸ÀASÉå : ¹D¸ÀÄE 88 ¸ÉÃ¯ÉÆÃAiÀÄÄ 2016, ¨ÉAUÀ¼ÀÆgÀÄ, ¢£ÁAPÀ : 07-02-2018.
¸ÀªÀÄ ¸ÀASÉåAiÀÄ ¸ÀPÁðgÀzÀ DzÉñÀ ¢£ÁAPÀ : 22-06-2016gÀ DzÉñÀzÀ ¨sÁUÀzÀ°è PÀArPÉ 3gÀ £ÀAvÀgÀ, PɼÀPÀAqÀ PÀArPÉ 3(C)£ÀÄß
¸ÉÃ¥ÀðqÉ ªÀiÁr N¢PÉÆ¼ÀîvÀPÀÌzÀÄÝ :-
"3(C)
E¯ÁSÁ «ZÁgÀuÉ CxÀªÁ Qæ«Ä£À¯ï ªÉÆPÀzÀݪÉÄ JzÀÄj¸ÀÄwÛgÀĪÀ AiÀiÁªÀÅzÉà C¢üPÁjAiÀÄ£ÀÄß ªÀÄÄRå
eÁUÀÈvÀ C¢üPÁj/eÁUÀÈvÀ C¢üPÁjAiÀÄ£ÁßV £ÉëĸÀvÀPÀÌzÀÝ®è ;
MAzÀÄ ªÉüÉ, ¥ÀzÀ¤«ÄvÀÛ «zsÁ£ÀzÀ°è (on ex-officio basis) ªÀÄÄRå eÁUÀÈvÀ C¢üPÁj/eÁUÀÈvÀ
C¢üPÁjAiÀiÁV ¥ÀzÀUÀ滸ÀĪÀ AiÀiÁªÀÅzÉà C¢üPÁjAiÀÄÄ E¯ÁSÁ «ZÁgÀuÉ CxÀªÁ Qæ«Ä£À¯ï ªÉÆPÀzÀݪÉÄ
JzÀÄj¸ÀÄwÛzÀݰè, CzÉà E¯ÁSÉ/PÀbÉÃjAiÀİè£À vÀvÀìªÀiÁ£À ªÀÈAzÀzÀ EvÀgÉ C¢üPÁjUÉ ªÀÄÄRå eÁUÀÈvÀ
C¢üPÁj/eÁUÀÈvÀ C¢üPÁjAiÀÄ dªÁ¨ÁÝjAiÀÄ£ÀÄß ªÀ»¸ÀvÀPÀÌzÀÄÝ. MAzÀÄ ªÉüÉ, vÀvÀìªÀiÁ£À ªÀÈAzÀzÀ C¢üPÁj
®¨sÀå«®è¢zÀݰè, ¥Àæ¸ÀÄÛvÀ ªÀÄÄRå eÁUÀÈvÀ C¢üPÁj/eÁUÀÈvÀ C¢üPÁjAiÀÄ ¥ÀzÀ¤«ÄvÀÛ ¥ÀzÀ£ÁªÀÄzÀ
(ex-officio
designation) £ÀAvÀgÀzÀ C¢üPÁjUÉ (Officer
next
in
seniority) ªÀÄÄRå eÁUÀÈvÀ
C¢üPÁj/eÁUÀÈvÀ C¢üPÁjAiÀÄ dªÁ¨ÁÝjAiÀÄ£ÀÄß ªÀ»¸ÀvÀPÀÌzÀÄÝ."
P.R. 306
SC. 200
PÀ£ÁðlPÀ gÁdå¥Á®gÀ DzÉñÀzÀ ªÉÄÃgÉUÉ ªÀÄvÀÄÛ CªÀgÀ ºÉ¸Àj£À°è,
ºÉêÀiÁªÀw
¸ÀPÁðgÀzÀ C¢üãÀ PÁAiÀÄðzÀ²ð (¥Àæ),
¹§âA¢ ªÀÄvÀÄÛ DqÀ½vÀ ¸ÀÄzsÁgÀuÉ E¯ÁSÉ. (eÁUÀÈw «¨sÁUÀ).
¨sÁUÀ 1
PÀ£ÁðlPÀ gÁdå¥ÀvÀæ, UÀÄgÀĪÁgÀ, ªÉÄà 31, 2018
607
COMMERCE & INDUSTRIES SECRETARIAT
Sub :
Approval to the project proposl of M/s. Wistron Infocomm Manufacturing India Pvt. Ltd. to establish a unit
for manufacture of “Smart phones, IOT Products and Biotech Devices” at Achchathanahalli Village,
Narasapura Industrial Area, Kolar Taluk and District.
Read :
1) Proceedings of the 48
th Land Audit Committee (LAC) meeting held on 12-02-2018.
2) Proceedings of the 50
th State High Level Clearance Committee (SHLCC) meeting held on 23-02-2018.
Preamble:
M/s. Wistron Infocomm Manufacturing India Pvt. Ltd. has proposed to establish a unit for manufacture of “Smart phones, IOT
Products and Biotech Devices” with an investment of `. 682.00 crore, generating employment to about 6000 persons at
Achchathanahalli Village, Narasapura Industrial Area, Kolar Taluk and District.
The proposal of the company has been placed before the 48
th LAC meeting held on 12-02-2018. The decision of the LAC is as
follows :
The committee after detailed discussions, resolved to recommend to SHLCC for approval of the project of M/s. Wistron
Infocomm Manufacturing India Pvt. Ltd. to establish a unit for manufacture of “Smart phones, IOT Products and Biotech Devices” in 43
acres of KIADB land in various Sy.Nos of Achchathanahalli Village, Narasapura Industrial Area, Kolar Taluk and District.
The proposal was examined and approved in the 50
th State High Level Clearance Committee (SHLCC) Meeting held on
23-02-2018.
Government has examined the recommendations made by the SHLCC in all aspects.
Hence the following Order.
GOVERNMENT ORDER NO. CI 64 SPI 2018, BENGALURU, DATED: 02-03-2018.
Government is pleased to accord in-principle approval to the investment proposal of M/s. Wistron Infocomm Manufacturing
India Pvt. Ltd. to establish a unit for manufacture of “Smart phones, IOT Products and Biotech Devices”, with an investment of
`. 682.00 crore at Achchathanahalli Village, Narasapura Industrial Area, Kolar Taluk and District. generating employment to about 6000
persons with the following infrastructure assistances, incentives and concessions:
Land :
KIADB to allot 43 acres of contiguous land in various Sy.Nos of Achchathanahalli Village,
Narasapura Industrial Area, kolar Taluk and District
Water :
2,00,000 LPD from KIADB
Power :
4300 KVA from BESCOM
Incentive & concessions :
a)
As per Industrial Policy / ESDM Policy of the State.
b)
Special Incentives and Concessions sought by the company may be considered separately.
Sanction of the above infrastructure facilities, incentives and concessions is subject to the following terms and
conditions :
1.
Environment : The company to obtain Consent for Establishment and Consent for Operation from KSPCB and
environmental clearance from MoEF, Govt. of India or the Dept of Forest, Ecology & Environment, Govt. of
Karnataka, if applicable.
2.
Employment : The Company shall comply with the provisions of applicable Policy of Govt. of Karnataka with respect
to local employment on the project. Prepare a plan for development of Human Resources required for the project,
train local people. A copy of Human Resources Development plan shall be sent to the Commissioner for Industrial
Development & Director of Industries and Commerce for monitoring.
3.
Vendor Development : Wherever there is scope for vendor development for the project, the company shall prepare
a vendor development plan, develop local vendors and procure the required inputs, components and sub-assemblies
form these local vendor units. A copy of the vendor development plan shall be sent to the Commissioner for
Industrial Development & Director of Industries and Commerce for monitoring.
4.
Social Infrastructure Development: The Company is advised to take up social infrastructure development projects
in the vicinity of the proposed location of the unit and comply with the stipulation of Company Act 2013. A copy of
such projects shall be sent to the Commissioner for Industrial Development & Director of Industries and Commerce
for monitoring.
5.
Others:
a)
The company shall adopt rainwater harvesting, waste water recycling and water conservation techniques. Zero
discharge facility should be adopted wherever applicable.
b)
The company shall take all statutory and other necessary clearances from the competent authorities including
Govt. of India.
608
PÀ£ÁðlPÀ gÁdå¥ÀvÀæ, UÀÄgÀĪÁgÀ, ªÉÄà 31, 2018
¨sÁUÀ 1
c)
As part of “Ease of Doing Business” Government vide Order No. CI 89 SPI 2013, Dated: 20-12-2014 has
accorded approval to operationalise e-Udyami Phase II for obtaining various clearances/ approvals / licenses
etc. through common e-platform for the projects approved through District Level Single Widow Clearance
Committee (DLSWCC) or State Level Single’ Window Clearance Committee (SLSWCC) or State High Level
Clearance Committee (SHLCC) w.e.f. 01-01-2015.
d)
The approvals / NOCs of following Departments have been covered under Phase II e-Udyami.
i.
Karnataka Industrial Areas Development Board.
ii.
Karnataka Small Scale Industries Development Corporation.
iii.
Karnataka State Pollution Control Board.
iv.
Factories, Boilers, Industrial Safety and Health Department
v.
Industries and Commerce Department
vi.
Town Planning Department and Local Planning Authorities
vii.
Municipal Administration Department
viii.
BESCOM/ GESCOM/ HESCOM/ CESCOM/ MESCOM
ix.
Karnataka State Fire and Emergency Services Department
x.
Water Resources Department
e)
The login and passwords which are used for filing application through e-Udyami Phase I are also applicable for
filing application through e-Udyami Phase II . E-Udyami Phase II web application may be accessed through
www.ebizkarnataka.gov.in and online application along with necessary documents may please be filed for
any of above Departments’ approval / NOCs.
f)
Karnataka Udyog Mitra (KUM) would provide the necessary escort services for the speedy implementation of
your project. You are requested to inform the progress made in the implementation of the project every quarter
in the proforma.
This approval is valid for a period of two years from the date of issue of this Government Order.
PR-234
SC-10
By Order and in the name of the Governor of Karnataka,
G . NAGARATHANAMMA
Desk Officer (Technical Cell)
Commerce & Industries Department.
COMMERCE & INDUSTRIES SECRETARIAT
Sub :
Approval to the project proposal of M/s. Sutlej Textiles and Industries Ltd. to establish a unit for manufacture
of “Technical Textiles and Active Wear Fabrics” at Badanaguppe-Kellamballi Industrial Area,
Chamarajanagara Taluk & District.
Read :
1) Proceedings of the 48
th Land Audit Committee (LAC) meeting held on 12-02-2018.
2) Proceedings of the 50
th State High Level Clearance Committee (SHLCC) meeting held on 23-02-2018.
Preamble :
M/s. Sutlej Textiles and Industries Ltd. has proposed to establish a unit for manufacture of “Technical Textiles and Active Wear
Fabrics” with an investment of `. 786.00 crore, generating employment to about 1800 persons at Badanaguppe-Kellamballi Industrial
Area, Chamarajanagara Taluk & District.
The proposal of the company has been placed before the 48
th LAC meeting held on 12-02-2018. The decision of the LAC is as
follows :
The committee after detailed discussions, resolved to recommend to SHLCC for approval of the project of M/s. Sutlej Textiles
and Industries Ltd. to establish a unit for manufacture of “Technical Textiles and Active Wear Fabrics”and KIADB to allot 46 acres of
land at Plot No. 146 in Badanaguppe-Kellamballi Industrial Area, Chamarajanagara Taluk & District.
The proposal was examined and approved in the 50
th State High Level Clearance Committee (SHLCC) Meeting held
on 23-02-2018.
Government has examined the recommendations made by the SHLCC in all aspects.
Hence the following Order.
GOVERNMENT ORDER NO. CI 65 SPI 2018, BENGALURU, DATED: 02-03-2018.
Government is pleased to accord in-principle approval to the investment proposal of M/s Sutlej Textiles and Industries Ltd. to
establish a unit for manufacture of “Technical Textiles and Active Wear Fabrics”, with an investment of `. 786.00 crore at
¨sÁUÀ 1
PÀ£ÁðlPÀ gÁdå¥ÀvÀæ, UÀÄgÀĪÁgÀ, ªÉÄà 31, 2018
609
Badanaguppe-Kellamballi Industrial Area, Chamarajanagara Taluk & District, generating employment to about 1800 persons with the
following infrastructure assistances, incentives and concessions:
Land :
KIADB to allot 46 acres of land at Plot No.146 in Badanaguppe-Kellamballi Industrial Area,
Chamarajanagara Taluk and District
Water :
36,00,000 LPD from KIADB
Power :
11722.5 KVA from CESCOM
Incentive & concessions :
a)
As per Textile Policy of the State.
b)
Special Incentives and Concessions sought by the company may be considered separately.
Sanction of the above infrastructure facilities, incentives and concessions is subject to the following terms and
conditions :
1
Environment : The company to obtain Consent for Establishment and Consent for Operation from KSPCB and
environmental clearance from MoEF, Govt. of India or the Dept of Forest, Ecology & Environment, Govt. of
Karnataka, if applicable.
2
Employment : The Company shall comply with the provisions of Textile Policy of Govt. of Karnataka with respect
to local employment on the project. Prepare a plan for development of Human Resources required for the project,
train local people. A copy of Human Resources Development plan shall be sent to the Commissioner for Industrial
Development & Director of Industries and Commerce for monitoring.
3
Vendor Development : Wherever there is scope for vendor development for the project, the company shall
prepare a vendor development plan, develop local vendors and procure the required inputs, components and sub-
assemblies from these local vendor units. A copy of the vendor development plan shall be sent to the
Commissioner for Industrial Development & Director of Industries and Commerce for monitoring.
4.
Social Infrastructure Development: The Company is advised to take up social infrastructure development
projects in the vicinity of the proposed location of the unit and comply with the stipulation of Company Act, 2013. A
copy of such projects shall be sent to the Commissioner for Industrial Development & Director of Industries and
Commerce for monitoring.
5.
Others:
a)
The company shall adopt rainwater harvesting, waste water recycling and water conservation techniques.
Zero discharge facility should be adopted wherever applicable.
b)
The company shall take all statutory and other necessary clearances from the competent authorities including
Govt. of India.
c)
As part of “Ease of Doing Business” Government vide Order No. CI 89 SPI 2013, Dated: 20-12-2014 has
accorded approval to operationalise e-Udyami Phase II for obtaining various clearances/ approvals / licenses
etc. through common e-platform for the projects approved through District Level Single Window Clearance
Committee (DLSWCC) or State Level Single’ Window Clearance Committee (SLSWCC) or State High Level
Clearance Committee (SHLCC) w.e.f. 01-01-2015.
d)
The approvals / NOCs of following Departments have been covered under Phase II e-Udyami.
i)
Karnataka Industrial Areas Development Board.
ii)
Karnataka Small Scale Industries Development Corporation.
iii)
Karnataka State Pollution Control Board.
iv)
Factories, Boilers, Industrial Safety and Health Department
v)
Industries and Commerce Department
vi)
Town Planning Department and Local Planning Authorities
vii)
Municipal Administration Department
viii)
BESCOM/ GESCOM/ HESCOM/ CESCOM/ MESCOM
ix)
Karnataka State Fire and Emergency Services Department
x)
Water Resources Department
e)
The login and passwords which are used for filing application through e-Udyami Phase I are also applicable
for filling application through e-Udyami Phase II. E-Udyami Phase II web application may be accessed
through www.ebizkarnataka.gov.in and online application along with necessary documents may please be
filed for any of above Departments’ approval / NOCs.
610
PÀ£ÁðlPÀ gÁdå¥ÀvÀæ, UÀÄgÀĪÁgÀ, ªÉÄà 31, 2018
¨sÁUÀ 1
f)
Karnataka Udyog Mitra (KUM) would provide the necessary escort services for the speedy implementation of
your project. You are requested to inform the progress made in the implementation of the project every
quarter in the proforma.
This approval is valid for a period of two years from the date of issue of this Government Order.
PR-235
SC-10
By Order and in the name of the Governor of Karnataka,
G . NAGARATHNAMMA
Desk Officer (Technical Cell)
Commerce & Industries Department.
COMMERCE & INDUSTRIES SECRETARIAT
Sub :
Approval to the project proposal of M/s.Anjalitai Canes Pvt. Ltd. to establish “5000 TCD Sugar
Plant, 30 MW Co-gen & 60 KLPD Distillery” at Halaga Village, Beedri Revenue Circle,
Khanapura Taluk, Belagavi District.
Read :
1) Proceedings of the 47
th Land Audit Committee (LAC) meeting held on 23-01-2018.
2) Proceedings of the 50
th State High Level Clearance Committee (SHLCC) meeting held on
23-02-2018.
Preamble :
M/s.Anjalitai Canes Pvt. Ltd. has proposed to establish “5000 TCD Sugar Plant, 30 MW Co-gen & 60 KLPD Distillery”, with an
investment of `. 532.00 crore, generating employment to about 800 persons at Halaga Village, Beedri Revenue Circle, Khanapura
Taluk, Belagavi District.
The representatives of the company appeared before the 47
th LAC meeting held on 23-01-2018 and highlighted the project
proposal.
Commissioner for Industrial Development and Director of Industries and Commerce informed that, as per the application the
company has no business transactions during the previous years and also the net worth of the company and promoters does not
support the equity requirement of the project.
The representative of the company informed that they are planning to allot shares of the company to Cane growers and also get
private equity for the project.
Commissioner for Industrial development and Director of Industries and Commerce informed the company to furnish details of
the financial arrangements made for the project.
The Committee noted the request of the company and after detailed discussions and subject to furnishing of relevant documents
on financial arrangements, resolved to recommend to SHLCC for approval of the project of M/s. Anjalitai Canes Private Limited to
establish “5000 TCD Sugar Plant, 30 MW Co-gen, & 60 KLPD Distillery” in 31 acre 12 guntas of land to be purchased U/s 109 of KLR
Act at Sy.No. 36 of Halaga Village, Beedri Revenue Circle, Khanapura Taluk, Belagavi District.
The proposal was examined and approved and subject to allocation of cane area by the competent authority in the 50
th State
High Level Clearance Committee (SHLCC) Meeting held on 23-02-2018.
Government has examined the recommendations made by the SHLCC in all aspects.
Hence the following Order.
GOVERNMENT ORDER NO. CI 66 SPI 2018, BENGALURU, DATED: 02-03-2018.
Government is pleased to accord in-principle approval to the investment proposal of M/s.Anjalitai Canes Pvt. Ltd. to establish
“5000 TCD Sugar Plant, 30 MW Co-gen & 60 KLPD Distillery” with an investment of `. 532.00 crore at Halaga Village, Beedri Revenue
Circle, Khanapura Taluk, Belagavi District, generating employment to about 800 persons with the following infrastructure assistances,
incentives and concessions subject to allocation of cane area by the competent authority :
Land :
31 acre 12 guntas of land to be purchased U/s 109 of KLR Act at Sy.No.36 of Halaga
Village, Beedri Revenue Circle, Khanapura Taluk, Belagavi District.
Water :
966000 LPD from Malaprabha River.
Power :
1250 KVA from HESCOM
Incentive & concessions :
As per Industrial Policy of the State.
Sanction of the above infrastructure facilities, incentives and concessions is subject to the following terms and
conditions :
1.
Environment : The company to obtain Consent for Establishment and Consent for Operation from KSPCB and
environmental clearance from MoEF, Govt. of India or the Dept of Forest, Ecology & Environment, Govt. of
Karnataka, if applicable.
¨sÁUÀ 1
PÀ£ÁðlPÀ gÁdå¥ÀvÀæ, UÀÄgÀĪÁgÀ, ªÉÄà 31, 2018
611
2.
Employment : The Company shall comply with the provisions of Industrial Policy of Govt. of Karnataka with
respect to local employment on the project. Prepare a plan for development of Human Resources required for the
project, train local people. A copy of Human Resources Development plan shall be sent to the Commissioner for
Industrial Development & Director of Industries and Commerce for monitoring.
3.
Vendor Development : Wherever there is scope for vendor development for the project, the company shall
prepare a vendor development plan, develop local vendors and procure the required inputs, components and sub-
assembilies form these local vendor units. A copy of the vendor development plan shall be sent to the
Commissioner for Industrial Development & Director of Industries and Commerce for monitoring.
4.
Social Infrastructure Development: The Company is advise to take up social infrastructure development projects
in the vicinity of the proposed location of the unit and comply with the stipulation of Company Act, 2013. A copy of
such projects shall be sent to the Commissioner for Industrial Development & Director of Industries and Commerce
for monitoring.
5.
Others:
a)
The company shall adopt rainwater harvesting, waste water recycling and water conservation techniques.
Zero discharge facility should be adopted wherever applicable.
b)
The company shall take all statutory and other necessary clearances from the competent authorities including
Govt. of India.
c)
As part of “Ease of Doing Business” Government vide Order No. CI 89 SPI 2013, Dated: 20-12-2014 has
accorded approval to operationalise e-Udyami Phase II for obtaining various clearances/ approvals / licenses
etc. through common e-platform for the projects approved though District Level Single Widow Clearance
Committee (DLSWCC) or State Level Single’ Window Clearance Committee (SLSWCC) or State High Level
Clearance Committee (SHLCC) w.e.f. 01-01-2015.
d)
The approvals / NOCs of following Departments have been covered under Phase II e-Udyami.
i)
Karnataka Industrial Areas Development Board.
ii)
Karnataka Small Scale Industries Development Corporation.
iii)
Karnataka State Pollution Control Board.
iv)
Factories, Boilers, Industrial Safety and Health Department
v)
Industries and Commerce Department
vi)
Town Planning Department and Local Planning Authorities
vii)
Municipal Administration Department
viii)
BESCOM/ GESCOM/ HESCOM/ CESCOM/ MESCOM
ix)
Karnataka State Fire and Emergency Services Department
x)
Water Resources Department
e)
The login and passwords which are used for filing application through e-Udyami Phase I are also applicable
for filling application through e-Udyami Phase II. E-Udyami Phase II web application may be accessed
through www.ebizkarnataka.gov.in and online application along with necessary documents may please be
filed for any of above Departments’ approval / NOCs.
f)
Karnataka Udyog Mitra (KUM) would provide the necessary escort services for the speedy implementation of
your project. You are requested to inform the progress made in the implementation of the project every
quarter in the proforma.
This approval is valid for a period of two years from the date of issue of this Government Order.
PR-236
SC-10
By Order and in the name of the Governor of Karnataka,
G . NAGARATHNAMMA
Desk Officer (Technical Cell)
Commerce & Industries Department.
COMMERCE & INDUSTRIES SECRETARIAT
Sub :
Approval to the project proposal of M/s.BPK Developments LLP to establish “IT / ITES Office spaces,
Hotel, Service Apartments and Common Facilities” at Doddanekkundi and Mahadevpura Villages,
Bengaluru East Taluk, Bengaluru urban District.
Read :
1) Proceedings of the 48
th Land Audit Committee (LAC) meeting held on 12-02-2018.
2) Proceedings of the 50
th State High Level Clearance Committee (SHLCC) meeting held on 23-02-2018.
612
PÀ£ÁðlPÀ gÁdå¥ÀvÀæ, UÀÄgÀĪÁgÀ, ªÉÄà 31, 2018
¨sÁUÀ 1
Preamble :
M/s.BPK Developments LLP has proposed to establish “IT / ITES Office spaces, Hotel, Service Apartments and Common
Facilities” with an investment of `. 3495.15 crore, generating employment to about 50000 persons at Doddanekkundi and Mahadevpura
Villages, Bengaluru East Taluk, Bengaluru Urban District.
The proposal of the company has been placed before the 48
th LAC meeting held on 12-02-2018. The decision of the LAC is as
follows :
The committee after detailed discussions, resolved to recommend to SHLCC for approval of the project of M/s. BPK
Developments LLP to establish “IT/ITES Office spaces, Hotel, Service Apartments and Common Facilities” and KIADB to acquire and
allot 90 Acres and 15 Guntas of land at Sy.Nos. 51, 52, 53, 55, 64, 65, 66 including all sub-numbers in Doddanekkundi village,
Marathahalli Hobli, Bengaluru East Taluk, and Sy. Nos 98, 99, 100, 101, 108, 109 including all sub-numbers in Mahadevpura village,
Mahadevpura Hobli, Bengaluru East Taluk, Bengaluru Urban District, as SUC from KIADB on consent basis.
The proposal was examined and approved in the 50
th State High Level Clearance Committee (SHLCC) Meeting held on
23-02-2018
Government has examined the recommendations made by the SHLCC in all aspects.
Hence the following Order.
GOVERNMENT ORDER NO. CI 67 SPI 2018, BENGALURU, DATED: 02-03-2018.
Government is pleased to accord in-principle approval to the investment proposal of M/s. BPK Developments LLP to establish
“IT/ITES Office spaces, Hotel, Service Apartments and Common Facilities” with an investment of `. 3495.15 crore at Doddanekkundi
and Mahadevapura Villages, Bengaluru East Taluk, Bengaluru Urban District, generating employment to about 50000 persons with the
following infrastructure assistances, incentives and concessions:
Land :
KIADB
to
acquire
and
allot
90
Acres
and
15
Guntas
of
land
at
Sy. Nos. 51, 52, 53, 55, 64, 65, 66 including all sub-numbers in Doddanekkundi Village,
Marathahalli Hobli, Bengaluru East Taluk, and Sy. Nos 98, 99, 100, 101, 108, 109 including
all sub-numbers in Mahadevpura Village, Mahadevpura Hobli, Bengaluru East Taluk,
Bengaluru Urban District, as SUC in conformity with zonal regulations of BDA/LPA and on
consent basis.
Water :
12,50,000 LPD from BWSSB.
Power :
5000 KVA from BESCOM.
Incentive & concessions :
As per applicable Policy of the State.
Sanction of the above infrastructure facilities, incentives and concessions is subject to the following terms and
conditions :
1.
Environment : The company to obtain Consent for Establishment and Consent for Operation from KSPCB and
environmental clearance from MoEF, Govt. of India or the Dept of Forest, Ecology & Environment, Govt. of
Karnataka, if applicable.
2.
Employment : The Company shall comply with the provisions of applicable Policy of Govt. of Karnataka with
respect to local employment on the project Prepare a plan for development of Human Resources required for the
project, train local people. A copy of Human Resources Development plan shall be sent to the Commissioner for
Industrial Development & Director of Industries and Commerce for monitoring.
3.
Vendor Development : Wherever there is scope for vendor development for the project, the company shall
prepare a vendor development plan, develop local vendors and procure the required inputs, components and sub-
assemblies from these local vendor units. A copy of the vendor development plan shall be sent to the
Commissioner for Industrial Development & Director of Industries and Commerce for monitoring.
4.
Social Infrastructure Development: The Company is advised to take up social infrastructure development
projects in the vicinity of the proposed location of the unit and comply with the stipulation of Company Act, 2013. A
copy of such projects shall be sent to the Commissioner for Industrial Development & Director of Industries and
Commerce for monitoring.
5.
Others:
a)
The company shall adopt rainwater harvesting, waste water recycling and water conservation techniques.
Zero discharge facility should be adopted wherever applicable.
b)
The company shall take all statutory and other necessary clearances from the competent authorities including
Govt. of India.
c)
As part of “Ease of Doing Business” Government vide Order No. CI 89 SPI 2013, Dated: 20-12-2014 has
accorded approval to operationalise e-Udyami Phase II for obtaining various clearances/ approvals / licenses
¨sÁUÀ 1
PÀ£ÁðlPÀ gÁdå¥ÀvÀæ, UÀÄgÀĪÁgÀ, ªÉÄà 31, 2018
613
etc. through common e-platform for the projects approved through District Level Single Window Clearance
Committee (DLSWCC) or State Level Single’ Window Clearance Committee (SLSWCC) or State High Level
Clearance Committee (SHLCC) w.e.f. 01-01-2015.
d)
The approvals / NOCs of following Departments have been covered under Phase II e-Udyami.
i)
Karnataka Industrial Areas Development Board.
ii)
Karnataka Small Scale Industries Development Corporation.
iii)
Karnataka State Pollution Control Board.
iv)
Factories, Boilers, Industrial Safety and Health Department
v)
Industries and Commerce Department
vi)
Town Planning Department and Local Planning Authorities
vii)
Municipal Administration Department
viii)
BESCOM/ GESCOM/ HESCOM/ CESCOM/ MESCOM
ix)
Karnataka State Fire and Emergency Services Department
x)
Water Resources Department
e)
The login and passwords which are used for filing application through e-Udyami Phase I are also applicable
for filling application through e-Udyami Phase II. E-Udyami Phase II web application may be accessed
through www.ebizkarnataka.gov.in and online application along with necessary documents may please be
filed for any of above Departments’ approval / NOCs.
f)
Karnataka Udyog Mitra (KUM) would provide the necessary escort services for the speedy implementation of
your project. You are requested to inform the progress made in the implementation of the project every
quarter in the proforma.
This approval is valid for a period of two years from the date of issue of this Government Order.
PR-237
SC-10
By Order and in the name of the Governor of Karnataka,
G . NAGARATHNAMMA
Desk Officer (Technical Cell)
Commerce & Industries Department.
COMMERCE & INDUSTRIES SECRETARIAT
Sub :
Approval to the project proposal of M/s.Amperia Lithium Battery Manufacturing Pvt. Ltd. to establish a unit
for manufacture of “Lithium Batteries for EV and Storage” at Gowribidanur 2
nd Phase Industrial Area,
Chikkaballapura District.
Read :
1)
Proceedings of the 48
th Land Audit Committee (LAC) meeting held on 12-02-2018.
2)
Proceedings of the 50
th State High Level Clearance Committee (SHLCC) meeting held on 23-02-2018.
Preamble :
M/s.Amperia Lithium Battery Manufacturing Pvt. Ltd. Has proposed to establish a unit for manufacture of “ Lithium Batteries for
EV and Storage”, with an investment of `. 1210.00 crore, generating employment to about 600 persons at Gowribidanur 2
nd Phase
Industrial Area, Chikkaballapura District
The representatives of the company appeared before the 48
th LAC meeting held on 12-02-2018 and informed that they have
submitted revised financials of the project and requested for allotment of 170 acres of land at Plot Nos 4, 5, 6, 7, 8, 9, 10, 14, 15, 16, 17,
19, 20, 21, 22, 23 in Gowribidanur 2
nd Phase Industrial Area, Chikkabalapura District.
CEO & EM, KIADB informed that only 88.97 acres of contiguous land comprising of Plot Nos. 4, 5, 6, 7, 8, 9, 10,17, 16, 15, 14,
13, 23, 22, 21, 20, 19, 18 was available for allotment in Gowribidanur 2
nd Phase Industrial Area and the same can be allotted to the
project.
The representatives of the company agreed to take up 88.97 acres of land as suggested by CEO & EM, KIADB for their first
phase of the project and informed that they would look into acquiring adjoining lands for further phases of the project.
The committee noted the request of the company and the opinion of CEO & EM, KIADB and after detailed discussions, resolved
to recommend to SHLCC for approval of the project of M/s. Amperia Lithium Battery Manufacturing Pvt. Ltd. to establish a unit for
manufacture of “Lithium Batteries for EV and Storage” and KIADB to allot 88.97 acres of contiguous land at Polt Nos. 4, 5, 6, 7, 8, 9, 10,
17, 16, 15, 14, 13, 23, 22, 21, 20, 19, 18 in Gowribidanur 2
nd Phase Industrial Area, Chikkabalapura District.
The proposal was examined and approved in the 50
th State High Level Clearance Committee (SHLCC) Meeting held on
23-02-2018
Government has examined the recommendations made by the SHLCC in all aspects.
614
PÀ£ÁðlPÀ gÁdå¥ÀvÀæ, UÀÄgÀĪÁgÀ, ªÉÄà 31, 2018
¨sÁUÀ 1
Hence the following Order.
GOVERNMENT ORDER NO. CI 68 SPI 2018, BENGALURU, DATED: 02-03-2018.
Government is pleased to accord in-principle approval to the investment proposal of M/s.Amperia Lithium Battery
Manufacturing Pvt. Ltd. to establish a unit for manufacture of “Lithium Batteries for EV and Storage”, with an investment of `. 1210.00
crore at Gowribidanur 2
nd Phase Industrial Area, Chikkaballapura District, generating employment to about 600 persons with the
following infrastructure assistances, incentives and concessions:
Land :
KIADB to allot 88.97 acres of contiguous land in Gowribidanur 2
nd Phase Industrial Area,
Chikkaballapura District.
Water :
40,000 LPD to be supplied by KIADB
Power :
6000 KVA from BESCOM
Incentive & concessions :
a) As per Electric Vehicle and Energy Storage Policy of the State
b) Special Incentives and Concessions sought by the company may be considered separately.
Sanction of the above infrastructure facilities, incentives and concessions is subject to the following terms and
conditions :
1.
Environment : The company to obtain Consent for Establishment and Consent for Operation from KSPCB
and environmental clearance from MoEF, Govt. of India or the Dept of Forest, Ecology & Environment, Govt.
of Karnataka, if applicable.
2.
Employment : The Company shall comply with the provisions of Electric Vehicle and Energy Storage Policy
of Govt. of Karnataka with respect to local employment on the project. Prepare a plan for development of
Human Resources required for the project, train local people. A copy of Human Resources Development plan
shall be sent to the Commissioner for Industrial Development & Director of Industries and Commerce for
monitoring.
3.
Vendor Development : Wherever there is scope for vendor development for the project, the company shall
prepare a vendor development plan, develop local vendors and procure the required inputs, components and
sub-assembilies from these local vendor units. A copy of the vendor development plan shall be sent to the
Commissioner for Industrial Development & Director of Industries and Commerce for monitoring.
4.
Social Infrastructure Development: The Company is advised to take up social infrastructure development
projects in the vicinity of the proposed location of the unit and comply with the stipulation of Company Act,
2013. A copy of such projects shall be sent to the Commissioner for Industrial Development & Director of
Industries and Commerce for monitoring.
5.
Others:
a) The company shall adopt rainwater harvesting, waste water recycling and water conservation techniques.
Zero discharge facility should be adopted wherever applicable.
b) The company shall take all statutory and other necessary clearances from the competent authorities
including Govt. of India.
c) As part of “Ease of Doing Business” Government vide Order No. CI 89 SPI 2013, Dated: 20-12-2014 has
accorded approval to operationalise e-Udyami Phase II for obtaining various clearances/ approvals /
licenses etc. through common e-platform for the projects approved through District Level Single Window
Clearance Committee (DLSWCC) or State Level Single’ Window Clearance Committee (SLSWCC) or
State High Level Clearance Committee (SHLCC) w.e.f. 01-01-2015.
d) The approvals / NOCs of following Departments have been covered under Phase II e-Udyami.
i)
Karnataka Industrial Areas Development Board.
ii)
Karnataka Small Scale Industries Development Corporation.
iii)
Karnataka State Pollution Control Board.
iv)
Factories, Boilers, Industrial Safety and Health Department
v)
Industries and Commerce Department
vi)
Town Plannig Department and Local Planning Authorities
vii)
Municipal Administration Department
viii)
BESCOM/ GESCOM/ HESCOM/ CESCOM/ MESCOM
ix)
Karnataka State Fire and Emergency Services Department
x)
Water Resources Department
¨sÁUÀ 1
PÀ£ÁðlPÀ gÁdå¥ÀvÀæ, UÀÄgÀĪÁgÀ, ªÉÄà 31, 2018
615
e)
The login and passwords which are used for filing application through e-Udyami Phase I are also applicable
for filling application through e-Udyami Phase II. E-Udyami Phase II web application may be accessed
through www.ebizkarnataka.gov.in and online application along with necessary documents may please be
filed for any of above Departments’ approval / NOCs.
f)
Karnataka Udyog Mitra (KUM) would provide the necessary escort services for the speedy implementation of
your project. You are requested to inform the progress made in the implementation of the project every
quarter in the proforma.
This approval is valid for a period of two years from the date of issue of this Government Order.
PR-238
SC-10
By Order and in the name of the Governor of Karnataka,
G . NAGARATHNAMMA
Desk Officer (Technical Cell)
Commerce & Industries Department.
COMMERCE & INDUSTRIES SECRETARIAT
Sub :
Amendment to the earlier approved project proposal of M/s. Dalmia Cement (Bharat) Ltd. – reg.
Read :
1. Government Order No. CI 75 SPI 2008, dt. 02-05-2008.
2. Government Order No. CI 75 SPI 2008, dt. 31-12-2008.
3. Government Order No. CI 01 SPI 2008(P3), dt. 06-06-2012
4. Government Order No. CI 01 SPI 2008(P3), dt. 10-12-2014
5. Proceedings of the 50
th State High Level Clearance Committee (SHLCC) meeting held on 23-02-2018..
Preamble :
Government has approved the establishment of Green Field Cement Plant of 4 Million Tonnes Capacity with 45 MW Captive
Thermal Power Generation Plant in 300 acres of land for factory and town ship and 1736.70 acres of land for mining by M/s. Dalimia
Cement (Bharath) Ltd. at Yadwad Village, Gokak Taluk, Belagavi District, with an investment of `. 1047.20 crore was approved by the
13
th SHLCC meeting held on 13-03-2008. Accordingly, Government Order was issued vide read at (1) above.
Further, the request of the company for transfer of approval from M/s. Dalmia Cement (Bharat) Ltd., to their subsidiary company
M/s. Dalmia Cement Ventures Ltd. And acquiring of additional land was approved in the 16
th SHLCC meeting held on 19-11-2008.
Accordingly, Government Order was issued vide read at (2) above.
The request of the company for extension of time to implement the project by two years and acquisition and allotment of balance
480 Acre and 5 guntas of land was approved in the 28
th SHLCC meeting held on 23-05-2012. Accordingly, Government Order was
issued vide read at (3) above.
Further, the request of the company for extension of time to implement the project by another 3 years was approved in the 36
th
SHLCC meeting held on 15-10-2014. Accordingly, Government Order No. CI 1 SPI 2008 (P3) dated: 10-12-2014 granting further 3
years time to implement the project was issued.
Now the company vide letter dated: 25-10-2017 has submitted that out of the total 3542 acres of land they have obtained
permission U/s 109 of KLR Act for on extent 1730 acres as detailed below and the project is already implemented in the year 2015.
Sl.No.
Order No.
Extent
1
RD 69 LRM 2006 dt: 26-12-2008
1103
2
RD 93 LRM 2009 dt: 29-09-2010
497
3
RD 93 LRM 2009 dt: 29-09-2016
130
Total
1730
Further, it is informed that, Director Mines & Geology has granted the Mining Lease and executed the Mineral Development
Projection Agreement on 11-01-2017 as per MMDR Act & Rules.
It is submitted that the company still has to acquire 1800 acres to complete the balance acquisition required for mininig purpose.
Hence, company has requested to accord approval for extension of time for project implementation for a further period of 5 years that is
up to year 2022.
The request of the company was discussed in the meeting which held on 08-02-2018 to discuss implementation status of
SHLCC/SLSWCC approved projects seeking amendments/extension of time, and the company was advised to submit a concrete
proposal with timelines for implementation of the project.
Accordingly, the company vide their letter dated: 16-02-2018 has submitted the implementation schedule, wherin it is submitted
that the project will be completed by the end of 2022 and hence has requested for extension of time for a further period of 5 years to
implement the project.
616
PÀ£ÁðlPÀ gÁdå¥ÀvÀæ, UÀÄgÀĪÁgÀ, ªÉÄà 31, 2018
¨sÁUÀ 1
Government has examined the recommendations made by the 50
th SHLCC in all aspects.
Hence the following Order.
GOVERNMENT ORDER NO. CI 01 SPI 2008(P3), BENGALURU, DATED: 03-03-2018.
The Government is pleased to grant extension of time to M/s. Dalmia Cement (Bharat) Ltd. At Yadwad Village, Gokak Taluk,
Belagavi District to implement the project approved vide Government Order No. CI 75 SPI 2008, dated: 02-05-2008 for further period of
five years from the date of issue of this order.
All other terms and conditions indicated in the Government Order dated: 02-05-2008 read at (1) above, remain unaltered.
PR-239
SC-10
By Order and in the name of the Governor of Karnataka,
G . NAGARATHNAMMA
Desk Officer (Technical Cell)
Commerce & Industries Department.
COMMERCE & INDUSTRIES SECRETARIAT
Sub :
Amendment to the earlier approved project proposal of M/s. Dalmia Cement (Bharat) Ltd.(DCBL) – reg.
Read :
1. Government Order No. CI 91 SPI 2008, dt. 07-05-2008.
2. Government Order No. CI 91 SPI 2008, dt. 31-12-2008.
3. Government Order No. CI 01 SPI 2008(P2), dt. 06-06-2012.
4. Government Order No. CI 01 SPI 2008(P3), dt. 28-12-2012.
5. Government Order No. CI 01 SPI 2008(P3), dt. 12-12-2014.
6. Proceedings of the 50
th State High Level Clearance Committee (SHLCC) meeting held on 23-02-2018.
Preamble :
Government has approved the establishment of Green Field Cement Plant of 4 Million Tones Capacity with 45 MW Captive
Thermal Power. Generation Plant in 400 acres of land for factory and town ship and 2500 acres of land for mining by M/s. Dalimia
Cement (Bharath) Ltd., at various Sy. Nos. of Taranalli and Konkanhalli and other Villages of Sedam Taluk, Kalaburagi District, with an
investment of `. 1027.3 Crore was approved by the 14
th SHLCC meeting held on 17-03-2008. Accordingly, Government Order was
issued vide read at (1) above.
Further, the request of the company for transfer of approval from M/s. Dalmia Cement (Bharat) Ltd., to their subsidiary company
M/s. Dalmia Cement Ventures Limited. and acquiring of additional 150 Acres of land U/s 109 of KLR Act was approved in the
16
th SHLCC meeting held on 19-11-2008. Accordingly, Government Order was issued vide read at (2) above.
The request of the company for extension of time to implement the project by two years and acquisition and allotment of balance
land was approved in the 28
th SHLCC meeting held on 23-05-2012. Accordingly, Government Order was issued vide read at (3) above.
Further, the request of the company to implement the project in the name M/s. Dalmia Cement (Bharat) Ltd. was again
considered vide Government Order read at (4) above.
The request of the company for extension of time to implement the project by another 3 years was approved in the 36
th SHLCC
meeting held on 15-10-2014. Accordingly, Government Order vide read at (5) above was issued.
Now the company vide letter dated: 06-10-2017 has submitted the details of action taken to implement the project as follows.
.Registered 540 acres of land U/s 109 of Karnataka Land reforms Act 1961 for industrial purpose, and in addition has
entered into agreement to sell for 262 acres of land in Sedam village, Kalaburagi District.
Conversion obtained for 481 acre 03 guntas of land in Konkanahalli, Beernahalli, Hosahalli & other Village, Sedam
Taluk, Kalaburagi District for the Mines area.
Invested `. 100 crore so far in purchase of land and other activities.
Obtained in principal approval for railway siding from South-Central Railway and submitted the DPR for final approval
along with charges of `. 70 Lakh.
It is submitted that project implementation is delayed due to following pending clearances:
6 1(b) clearance form Government of Karnataka
Purchase of the remaining lad for operation of the mining lease, the land acquisition will start only after grant of
Mininig Lease.
Letter of Intent from the Director Mines & Geology under 10 A 2(b) of the MMDR Act and Grant of Mining Lease for an
extent of 995.97 Hec is yet to start.
Application No: DMG: MLS: 736 AML 07:08-09/158, dated: 08-04-2009 from Department of Mines & Geoiogy for an
area of 995.97 hectares for Kalaburagi Project is under consideration as per the Section 10 A 2 (b) of the amended
Mines & Minerals Act.
¨sÁUÀ 1
PÀ£ÁðlPÀ gÁdå¥ÀvÀæ, UÀÄgÀĪÁgÀ, ªÉÄà 31, 2018
617
It is submitted that delay in getting the mining lease which is beyond the control of the company has delayed the whole project.
Hence, company has requested for extension of time for project implementation for a further period of 5 years.
The request of the company was discussed in the meeting which held on 08-02-2018 to discuss implementation status of
SHLCC/SLSWCC approved projects seeking amendments/extension of time, and the company was advised to submit a concrete
proposal with timelines for implementation of the project.
Accordingly, the company vide their letter dated: 16-02-2018 has submitted that they need 5 years time for execution of the
project from the date of grant of LOI for the associated mining lease and hence has requested for extension of time for a further period
of 5 years to implement the project.
The proposal of the company was examined in the 50
th SHLCC Meeting held on 23-02-2018 and approved.
Government has examined the recommendation made by the 50
th SHLCC in all aspects.
Hence the following Order.
GOVERNMENT ORDER NO. CI 01 SPI 2008 (P3), BENGALURU, DATED: 03-03-2018.
The Government is pleased to grant extension of time to M/s. Dalmia Cement (Bharat) Ltd. (DCBL) at various Sy. Nos. of
Taranalli and Konkanhalli and other Villages of Sedam Taluk, Kalaburagi District to implement the project approved vide Government
Order No. CI 91 SPI 2008, dated: 07-05-2008 for further period of five years from the date of issue of this order.
All other terms and conditions indicated in the Government Order No. CI 91 SPI 2008, dated: 07-05-2008 read at (1) above,
remain unaltered.
PR-240
SC-10
By Order and in the name of the Governor of Karnataka,
G . NAGARATHNAMMA
Desk Officer (Technical Cell)
Commerce & Industries Department.
COMMERCE & INDUSTRIES SECRETARIAT
Sub :
Amendment to the earlier approved project proposal of M/s. JSW Steel Ltd. –reg.
Read :
1. Proceedings of the 43
rd State High Level Clearance Committee (SHLCC) meeting held on 01-02-2016.
2. Government Order No. CI 51 SPI 2016, dated: 29-02-2016.
3. Proceedings of the 50
th State High Level Clearance Committee (SHLCC) meeting held on 23-02-2018.
Preamble :
The project proposal of M/s. JSW Steel Ltd., for “Augmenting the existing steel plant with additional manufacturing facilities” with
an investment of `. 15,529.00 crore in existing land within the existing factory premises at Toranagallu village, Sandur Taluk, Ballari
District, was approved in the 43
rd SHLCC meeting held on 01-02-2016. Accordingly Government Order was issued vide read at (2)
above. In this order it was also approved that KIADB to acquire and allot land for laying the pipeline to draw water after getting the water
pipeline alignment details along with the details of land to be acquired from the company.
Now, the company vide their letter dated: 20-06-2017 have requested for the following amendments to their earlier approved
Government Order dated: 29-02-2016.
a)
Amendment to approval Government Order by including:
“To acquire 49.61 acres of land U/s 109 of KLR Act in various Sy.Nos. of Bhujanganagar, lakshmipura and Bannihatti
Villages of Sandur Taluk, Ballari District for installation of 83 Kms long pipe conveyor to transport iron ore from mines to the
plant at Toranagallu.
b)
Change of mode of acquisition of land from KIADB to U/s 109 of KLR Act for laying the pipeline to draw water for the
project.
The proposal of the company was examined in the 50
th State High Level Clearance Committee (SHLCC) Meeting held on
23-02-2018 and approved.
Government has examined the recommendations made by the 50
th SHLCC in all aspects.
Hence the following order.
GOVERNMENT ORDER NO. CI 51 SPI 2016, BENGALURU, DATED: 02-03-2018.
Government is pleased to accord approval for the following:
a)
Amendment to approval Government Order by including:
“To acquire 49.61 acres of land U/s 109 of KLR Act in various Sy.Nos. of Bhujanganagar, lakshmipura and Bannihatti
Villages of Sandur Taluk, Ballari District for installation of 83 Kms long pipe conveyor to transport iron ore from mines to the
plant at Toranagallu.
618
PÀ£ÁðlPÀ gÁdå¥ÀvÀæ, UÀÄgÀĪÁgÀ, ªÉÄà 31, 2018
¨sÁUÀ 1
b)
Change of mode of acquisition of land from KIADB to U/s 109 of KLR Act for laying the pipeline to draw water for the
project.
All other terms and conditions indicated in the Government Order dated: 29-02-2016 read at (2) above, remain unaltered.
PR-241
SC-10
By Order and in the name of the Governor of Karnataka,
G . NAGARATHNAMMA
Desk Officer (Technical Cell)
Commerce & Industries Department.
COMMERCE & INDUSTRIES SECRETARIAT
Sub :
Amendment to the earlier approved project proposal of M/s ILC Industries Ltd. – reg.
Read :
1. Proceedings of the 10
th and 13
th State High Level Clearance Committee (SHLCC) meeting held on
28-08-2007 and 13-03-2008 respectively.
2. Government Order No. CI 74 SPI 2008, dated: 29-04-2008.
3. Proceedings of the 24
th State High Level Clearance Committee (SHLCC) meeting held on 24-01-2011.
4. Government Order No. CI 74 SPI 2008, dated: 11-03-2011.
5. Proceedings of the 50th State High Level Clearance Committee (SHLCC) meeting held on 23-02-2018.
Preamble :
The project proposal of M/s. ILC Industries Ltd., was accorded approval in the 10
th & 13
th State High Level Clearance Committee
meeting held on 28-08-2007 and 13-03-2008 respectively to establish “Integrated Steel Plant-0.2 MTPA” with an investment of
`. 717.40 in 102 acre 35 gunta of land U/s 109 of KLR Act at various survey numbers of Kunikere Village, Koppala Taluk & District. The
Government Order was issued vide read at (2) above.
As per decision of 24
th State High Level Clearance Committee meeting held on 24-01-2011 Government has accord approval
given to M/s ILC Industries Ltd. In favour of M/s. ILC Iron & Steel Pvt. Ltd.
As per the Incorporation certificate dated: 17-10-2008, the constitution of the company is changed form Public Limited to Private
Limited and the name has been changed from M/s. ILC Industries Ltd. to M/s. ILC Iron & Steel Pvt. Ltd.
Now, the company vide their letter dated: 07-12-2017 has informed that 102 acres 35 guntas of land approved for the project
U/s 109 of KLR Act are owned by the promoters of the company and they have obtained conversion of land to Industrial purpose from
Deputy Commissioner, Koppal, and also have implemented the project. They have requested for approval for transfer of above
converted lands from the name of promoters to the name of the company along with change of constitution in the company and name of
the company.
The proposal of the company was examined in the 50
th State High Level Clearance Committee (SHLCC) Meeting held on
23-02-2018 and approved.
Government has examined the recommendations made by the 50
th SHLCC in all aspects.
Hence the following Order.
GOVERNMENT ORDER NO. CI 53 SPI 2018, BENGALURU, DATED: 03-03-2018.
The Government is pleased to accord approval to change of constitution of the company from Public Limited to Private Limited
and change of name from M/s. ILC Industries Ltd. To M/s. ILC Iron and Steel Pvt. Ltd.
All other terms and conditions indicated in the Government Order dated: 29-04-2008 read at (2) above, remain unaltered.
PR-242
SC-10
By Order and in the name of the Governor of Karnataka,
G . NAGARATHNAMMA
Desk Officer (Technical Cell)
Commerce & Industries Department.
COMMERCE & INDUSTRIES SECRETARIAT
Sub :
Amendment to the earlier approved project proposal of M/s. Havells India Ltd., - reg.
Read :
1.
Proceedings of the 43
rd State High Level Clearance Committee (SHLCC) meeting held on 01-02-2016.
2.
Government Order No. CI 58 SPI 2016, dated: 01-03-2016.
3.
Government Order No. CI 58 SPI 2016, dated: 31-03-2016.
4.
Proceedings of the 50
th State High Level Clearance Committee (SHLCC) meeting held on
23-02-2018.
¨sÁUÀ 1
PÀ£ÁðlPÀ gÁdå¥ÀvÀæ, UÀÄgÀĪÁgÀ, ªÉÄà 31, 2018
619
Preamble :
The project proposal of M/s. Havells India Ltd., to establish a unit for manufacture of “Cable & Wire, MCB, LED, Electronics,
Solar Lights” in 50 acres of land at Hi-tech Defence & Aerospace Park, Devanahalli, Bengaluru Rural District with an investment of
`. 1059.00 crore generating employment to about 2576 persons was approved in the 43
rd SHLCC meeting held on 01-02-2016.
Subsequently Government vide order read at (2) above has been issued.
In the Government Order read at (3) above Government has accorded approval for the following proposals of the company.
1.
Change of location of the project from Devanahalli to Vasanthanarasapura Industrial Area, Tumakuru.
2.
KIADB to allot 62.09 acres of land in plot No.685 & 686 at Vasanthanarasapura Industrial Area, Tumakuru.
KIADB vide allotment Letter No.KIADB/Allot/AS/21140/2924/2016-17, dated: 30-05-2016, has allotted 60.24 acres of land at
Plot No.685 & 686 in Vasanthanarasapura 3
rd Phase Industrial Area, Tumakuru and subsequently has issued possession Certificate
vide No.IADB/TMK/VNPR-3/AE/PC/879/2016-17, dated: 16-07-2016.
The company vide their letter dated: 13-02-2018 has submitted that due to malki payment issues and additional demand of
Rs.8.09 crore by KIADB towards Infrastructure development, HT overhead line, farmers agitation for want of their unpaid amount, they
could not execute Lease Deed with KIADB and commence the construction activities in time. Now, most of the issues are sorted out and
they are ready to take up project implementation.
In view of the above, the company has requested to grant extension of time till July 2021 to implement the project.
The proposal of the company was examined in the 50
th State High Level Clearance Committee (SHLCC) Meeting held on
23-02-2018 and approved.
Government has examined the recommendations made by the 50
th SHLCC in all aspects.
Hence the following Order.
GOVERNMENT ORDER NO. CI 58 SPI 2016, BENGALURU, DATED: 03-03-2018.
The Government is pleased to grant extension of time by three years to M/s. Havells India Ltd. to implement the project
approved vide Government Order No. CI 58 SPI 2016, dated: 31-03-2016 from the date of issue of this order.
All other terms and conditions indicated in the Government Order dated: 31-03-2016 read at (2) above, remain unaltered.
PR-243
SC-10
By Order and in the name of the Governor of Karnataka,
G . NAGARATHNAMMA
Desk Officer (Technical Cell)
Commerce & Industries Department.
COMMERCE & INDUSTRIES SECRETARIAT
Sub :
Amendment to the earlier approved project proposal of M/s. Shree Cement Ltd., - reg.
Read :
1 Proceedings of the 28
th State High Level Clearance Committee (SHLCC) meeting held on 23-05-2012.
2 Government Order No. CI 190 SPI 2012, dated: 24-05-2012.
3 Proceedings of the 50
th State High Level Clearance Committee (SHLCC) meeting held on 23-02-2018.
Preamble :
The project proposal of M/s. Shree Cement Ltd. to establish “6 MTPA Cement Plant” with an investment of `. 2000.00 crore in
1900 acres of land to be purchased U/s 109 of KLR Act at different Sy. Nos. of Tilgul, Balwad, Kirangi & B.Saradgi Villages, Kalaburagi
Taluk and District was approved in the 28
th meeting of SHLCC held on 23-05-2012. Accordingly Government Order was issued vide
read at (2) above.
Now, the company vide letter dated: 12-02-2018 has requested to mention the plant area as 370.65 acres and mining area
as 1529.35 acres within the total approved land area of 1900 acres and issue amendment to the project approval Government Order
dated: 24-05-2012.
The proposal of the company was examined in the 50
th State High Level Clearance Committee (SHLCC) Meeting held on
23-02-2018 and approved.
Government has examined the recommendations made by the 50
th SHLCC in all aspects.
Hence the following Order.
GOVERNMENT ORDER NO. CI 70 SPI 2018, BENGALURU, DATED: 03-03-2018.
Government is pleased to accord approval for the following:
To mention the land requirement in SHLCC approval Government Order No. CI 190 SPI 2012, dated: 24-05-2012 as: “1900
acres of land (370.65 acres for Plant area and 1529.35 acres for Mining area) to be purchased U/s 109 of KLR Act at different Sy. Nos.
of Tilgul Balwad, Kirangi and B Saradgi Villages, Kalaburagi Taluk and District”.
All other terms and conditions indicated in the Government Order dated: 24-05-2012 read at (2) above, remain unaltered.
PR-244
SC-10
By Order and in the name of the Governor of Karnataka,
G . NAGARATHNAMMA
Desk Officer (Technical Cell)
Commerce & Industries Department.
620
PÀ£ÁðlPÀ gÁdå¥ÀvÀæ, UÀÄgÀĪÁgÀ, ªÉÄà 31, 2018
¨sÁUÀ 1
COMMERCE & INDUSTRIES SECRETARIAT
Sub :
Amendment to the earlier approved project proposal of M/s.Bidadi Vendors Industrial Park Welfare
Association - reg.
Read :
1. Proceedings of the 37
th State High Level Clearance Committee (SHLCC) meeting held on 27-03-2015.
2. Government Order No. CI 118 SPI 2015, dated: 06-05-2015.
3. Proceedings of the 43
rd State High Level Clearance Committee (SHLCC) meeting held on 01-02-2016.
4. Government Order No. CI 118 SPI 2015, dated: 09-03-2016.
5. Proceedings of the 50
th State High Level Clearance Committee (SHLCC) meeting held on 23-02-2018.
Preamble:
The project proposal of M/s. Bidadi Vendors Industrial Park Welfare Association to establish “Vendors Park for Automobile
Components and others” at Sy. Nos.158, 159, 160 of Banandur Village and Sy. Nos.75, 76, 77 of Heggedegere Village, Sy. No. 20, 21
of Ittamadu Village, Sy. Nos. 91, 101, 102, 103, 104, 105 and 109 of Abbanakuppe Village, Bidadi Hobli, Ramanagara Taluk with an
investment of `. 700 crore, generating employment to about 4,900 persons was approved by the 37
th SHLCC meeting held
on 27-03-2015. The Government Order was issued vide read at (2) above.
Subsequently, deletion of Sy. No.160 of Banandur Village and Sy. Nos. 75, 76, 77 of Heggadagere Village from the Sy. Nos.
already approved and inclusion of alternate Sy.No.92,97 to 100, 106 to 108 of Abbanakupee Village and Sy.No.157 of Banandur Village
for the project to purchase balance 50 acres 7 guntas of land U/s 109 of KLR Act in the new Sy.Nos. within the total approved extent of
95 acres of land subject to zoning regulations of Local Planning Authority, was approved in the 43
rd SHLCC meeting held on 01-02-
2016. Accordingly, Government Order was issued vide read at (4) above.
Now, the company vide their letter dated: 04-12-2017 has informed that they have taken the following effective steps to
implement 1
st Phase of the project.
The company has purchased 44 acres of land in Bananduru and Heggadegere Villages and the same have been
converted for industrial purpose and development work is in progress.
Application has been filed with BMICAPA seeking change of ‘land use’ of lands falling within their limits and the said
application, having received the approval of all relevant authorities, is placed before the BMICAPA for consideration.
Change of land use and preliminary approval of layout plan has also been obtained.
KSPCB has issued No Objection Certificate.
BESCOM has issued its No Objection Certificate.
Have constructed roads & drainages and erection of electric poles is in progress.
Further, the company has requested the Committee for approval of the following:
BMRDA to accord plan approval for 2
nd phase of the project in 50 acres of existing adjacent land at Sy. Nos. 90, 91,
92, 97 to 109 of Abbanakuppe Village and Sy.Nos.20 and 21 of Ittamadu Village.
Extension of time by 3 years to implement the project.
The proposal of the company was examined in the 50
th State High level Clearance Committee (SHLCC) Meeting held on
23-02-2018 and approved to grant extension of time by three years to implement the project.
Government has examined the recommendations made by the 50
th SHLCC in all aspects.
Hence the following Order.
GOVERNMENT ORDER NO. CI 118 SPI 2015, BENGALURU, DATED: 03-03-2018.
The Government is pleased to grant extension of time to M/s. Bidadi Vendors Industrial Park Welfare Association to implement
the project approved vide Government Order No. CI 118 SPI 2015, dated: 06-05-2015 for further period of three years from the date of
issue of this order.
All other terms and conditions indicated in the Government Order dated: 06-05-2015 read at (2) above, remain unaltered.
PR-245
SC-10
By Order and in the name of the Governor of Karnataka,
G . NAGARATHNAMMA
Desk Officer (Technical Cell)
Commerce & Industries Department.
ªÀÄÄzÀæPÀgÀÄ ºÁUÀÆ ¥ÀæPÁ±ÀPÀgÀÄ:- ¸ÀAPÀ®£Á¢üPÁjUÀ¼ÀÄ, PÀ£ÁðlPÀ gÁdå¥ÀvÀæ, ¸ÀPÁðj PÉÃAzÀæ ªÀÄÄzÀæuÁ®AiÀÄ, ¨ÉAUÀ¼ÀÆgÀÄ-59.
R.N.I. No. KARBIL/2001/47147 POSTAL REGN. No. RNP/KA/BGS/2202/2017-19
Licensed to post without prepayment WPP No. 297