(603)

¨sÁUÀ 1

gÁdå ¸ÀPÁðgÀzÀ ªÀÄÄRå DzÉñÀUÀ¼ÀÄ ºÁUÀÆ ¸ÀÄvÉÆÛÃ¯É ªÀÄÄAvÁzÀ

J¯Áè E¯ÁSÉUÀ½UÀÆ ¸ÀA§A¢ü¹zÀ DzÉñÀUÀ¼ÀÄ

FOREST, ECOLOGY AND ENVIRONMENT SECRETARIAT

Sub:

Constitution of State Project Management Unit for the Integrated Coastal Zone

Management Project Phase-II (ICZMP Phase-II) with the World Bank Assistance –reg.

Read:

1.

Proceedings of the meeting held under the chairmanship of the Additional Chief

Secretary to Government, Forest, Ecology and Environment Department on

22.09.2015 at Vikasa Soudha, Bengaluru.

2.

Minutes of the meeting on ICZMP Phase-II held on 08.01.2018 in the MoEF & CC,

New Delhi.

PREAMBLE:

The Ministry of Environment, Forests and Climate Change (MoEF & CC) Government of India has identified Karnataka State

for the proposed Integrated Coastal Zone Management Project (ICZMP) Phase-II assisted by the Ministry and the World Bank. The

overall objective of the project is to build sustainable management of coastal resources to provide sustained livelihood security for the

coastal population.

The Government of India has allocated a budget outlay of `. 310 Crores to the State, out of which the State Government

contribution is 20%. The duration of the project is 6 years (2019-25) involving, two stages of 4 years each with an overlap of 2 years

between the two stages. In the First Stage, the project will be implemented in Mangaluru, Kundapura and Kumta Taluks of Dakshina

Kannada, Udupi and Uttara Kannada districts respectively.

As per the minutes of the meeting held at Ministry of Environment, Forest and Climate Change cited at ref (2) above, a Nodal

agency called State Project Monitoring Unit has to be established under the Department of Forest, Ecology and Environment,

Government of Karnataka for smooth implementation of the project, which should be a registered society under the Karnataka Societies

Registration Act, 1960. Accordingly, it is proposed to establish State Project Management Unit under Integrated Coastal Zone

Management Society -Karnataka which is a registered Society with head quarters at Mangaluru. In order to implement the project

smoothly, it is proposed to have following staff composition for the State Project Monitoring Unit (SPMU).

State Project Management Unit (SPMU), Integrated Coastal Zone Management Project (ICZMP) Phase-II, Mangaluru

Sl.

No.

Designation

Qualification /Experience

On Deputation /

Contractual Basis

1

Project Director

Indian

Forest

Service

Officer

-

Chief

Conservator of Forests Rank and above

On Deputation basis

2

Additional Project Director (APD)

Indian Forest Service Officer - Conservator of

Forests Rank and above

On Deputation basis

3

Administrative Officer

cum Procurement Officer

KAS – Junior Scale

On Deputation basis

¸ÀA¥ÀÄl 153

Volume 153

¨ÉAUÀ¼ÀÆgÀÄ, UÀÄgÀĪÁgÀ, ªÉÄà 31, 2018 (eÉåõÀ× 10, ±ÀPÀ ªÀµÀð 1940)

Bengaluru, Thursday, May 31, 2018 (Jyeishta 10, Shaka Varsha 1940)

¸ÀAaPÉ 22

Issue 22

604

PÀ£ÁðlPÀ gÁdå¥ÀvÀæ, UÀÄgÀĪÁgÀ, ªÉÄà 31, 2018

¨sÁUÀ 1

Sl.

No.

Designation

Qualification /Experience

On Deputation /

Contractual Basis

4

Account Officer

Joint Director (Finance)

State Accounts Department

on Deputation

5

Programme Manager

(Planning)

Assistant Director of Urban Planning

Urban Development

Department on Deputation

6

Programme Manager (Fisheries)

Deputy Director of Fisheries from the State

Fisheries Department or Academicians of the

rank of Assistant Professors and above

from any universities in the relevant field.

Fisheries

Department

or

University

7

Programme Manager (Ecologist)

MSc/Botony/Zoology/Marine/ Biology/Ecology

On Contract Basis

8

Programme Manager

(Rural Development)

MSW/MA in Sociology

On Contract Basis

9

Programme Manager

(Communication & Capacity Building)

Post Graduation in Journalism and Mass

Communication

On Contract Basis

10

Programme Manager (MIS)

GIS/MIS Expert

On Contract Basis

The overall objective of the Integrated Coastal Zone Management Project (ICZMP) Phase-II - Karnataka is to promote the

sustainable management of the natural and physical resources of the coastal environment. The State Project Management Unit

(SPMU) is established under Integrated Coastal Zone Management Society (ICZMS) –Karnataka to Co-ordinate all the project activities.

The Unit will be headed by a Project Director (PD) under the supervision of Steering Committee and ICZMP Phase II. Hence the

following order.

GOVERNMENT ORDER NO: FEE 17 CRZ 2018, BENGALURU, DATED: 20-04-2018

Pursuant to the facts and the circumstances explained in the preamble, the Government is pleased to constitute the State

Project Management Unit (SPMU), under Integrated Coastal Zone Management Society (ICZMS) – Karnataka with the following

composition for implementation of ICZMP Phase-II with its Head Quarters at Mangaluru.

State Project Management Unit (SPMU), Integrated Coastal Zone Management Project (ICZMP) Phase-II, Mangaluru

Sl.

No.

Designation

Qualification /Experience

On Deputation /

Contractual Basis

1

Project Director

Indian

Forest

Service

Officer

-

Chief

Conservator of Forests Rank and above

On Deputation basis

2

Additional Project Director (APD)

Indian Forest Service Officer - Conservator of

Forests Rank and above

On Deputation basis

3

Administrative Officer

cum Procurement Officer

KAS – Junior Scale

On Deputation basis

4

Account Officer

Joint Director (Finance)

State Accounts Department

on Deputation

5

Programme Manager

(Planning)

Assistant Director of Urban Planning

Urban

Development

Department on Deputation

6

Programme Manager (Fisheries)

Deputy Director of Fisheries from the State

Fisheries Department or Academicians of the

rank of Assistant Professors and above

from any universities in the relevant field.

Fisheries

Department

or

University

7

Programme Manager (Ecologist)

MSc/Botony / Zoology/Marine/

Biology/Ecology

On Contract Basis

8

Programme Manager

(Rural Development)

MSW/MA in Sociology

On Contract Basis

9

Programme Manager

(Communication & Capacity Building)

Post Graduation in Journalism and Mass

Communication

On Contract Basis

10

Programme Manager (MIS)

GIS/MIS Expert

On Contract Basis

The Unit shall undertake the following activities :-

¨sÁUÀ 1

PÀ£ÁðlPÀ gÁdå¥ÀvÀæ, UÀÄgÀĪÁgÀ, ªÉÄà 31, 2018

605

1)

To interact among the State Departments and participating Agencies, Ministry of Environment, Forest and Climate Change,

Government of India, World Bank and the Consultants and Experts for the implementation of the project in the State

Government.

2)

To Co-ordinate in preparation and submission of all financial proposals from the State to MoEF&CC and obtain funds for

distribution to state implementing Departments of the State Government.

3)

To render periodical progress reports expenditure statements etc. to MoEF &CC / World Bank

4)

To organise regular monitoring and evaluation for all components of the Project

5)

To organise periodical review meetings including meetings of Steering Committee of the project and take follow up action on

the recommendations made by the Committee

6)

To organise camps, exposure visits, training etc. for capacity building and orientation of implementing Departments /

Agencies, Coastal Community and NGOs

7)

To prepare documents, compilation and analysis of relevant data, publicity of Project activity, and creation of awareness

among public on positive impact of the project

8)

To organise scientific studies for future management of coastal region

9)

To Co-ordinate in preparation of interim and completion report for all components of the Project.

10) Any other activities which is included in the Detailed Project Reports (DPR)

This issues with the Finance Department concurrence provided Vide Note No. FD 229 exp-5/2018, dated: 26.03.2018.

P.R. 304

SC. 200

By Order and in the name of the Governor of Karnataka,

H C Rajendra Kumar

Under Secretary to Government (I/c),

(Ecology and Environment)

Forest, Ecology and Environment Department.

G£ÀßvÀ ²PÀët ¸ÀaªÁ®AiÀÄ

«µÀAiÀÄ :-

qÁ:

¥ÉæÃªÀÄPÀĪÀiÁgï

EªÀgÀ

ºÀÄzÉÝAiÀÄ

«°Ã£À

ºÁUÀÆ

¥ÀzÉÆÃ£ÀßwAiÀÄ£ÀÄß

¤AiÀĪÀĨÁ»gÀªÁV ªÀÄAdÆgÀÄ ªÀiÁrgÀĪÀ §UÉÎ.

NzÀ¯ÁVzÉ :-

1.

¸ÀPÁðgÀzÀ PÁgÀt PÉüÀĪÀ £ÉÆÃnÃ¸ï ¸ÀASÉå: Er 590 AiÀÄÄJ£ïE 2014,

¢£ÁAPÀ: 04-02-2015.

2.

PÀÄ®¸ÀaªÀgÀÄ, eÁ£À¥ÀzÀ «±Àé«zÁå®AiÀÄ, EªÀgÀ ¥ÀvÀæ ¸ÀA. PÀeÁ««/D«/PÀæªÀiÁAPÀ,

¢£ÁAPÀ: 18-02-2015.

¥Àæ¸ÁÛªÀ£É :-

ªÉÄÃ¯É NzÀ¯ÁzÀ (1)gÀ ¸ÀPÁðgÀzÀ PÁgÀt PÉüÀĪÀ £ÉÆÃn¸ï£À°è qÁ. ¥ÉæÃªÀiïPÀĪÀiÁgï EªÀgÀ£ÀÄß PÀ£ÁðlPÀ eÁ£À¥ÀzÀ «±Àé«zÁå®AiÀÄzÀ

eÁ£À¥ÀzÀ ¨sÁµÁAvÀgÀ PÉÃAzÀæzÀ qÉÊgÉPÀÖgï PÀA ¥ÁæzsÁå¥ÀPÀgÀ ºÀÄzÉÝAiÀÄ°è «°Ã£ÀUÉÆ½¸À®Ä ¢£ÁAPÀ: 11-04-2015gÀAzÀÄ £ÀqÉzÀ ¹ArPÉÃmï

¸À¨sÉAiÀİè wêÀiÁð¤¸À¯ÁVzÉ. ¸ÀzÀj wêÀiÁð£ÀªÀÅ F PɼÀV£À PÁgÀtUÀ½AzÀ ¤AiÀĪÀĨÁ»gÀªÁVzÉ.

(1)

qÁ: ¥ÉæÃªÀÄPÀĪÀiÁgï PÉ. EªÀgÀ£ÀÄß ¸ÀPÁðgÀzÀ C£ÀÄªÉÆÃzÀ£É ¥ÀqÉzÀÄ ¤AiÉÆÃd£É ªÉÄÃgÉUÉ PÀ£ÀßqÀ

«±Àé«zÁå®AiÀÄ¢AzÀ eÁ£À¥ÀzÀ «±Àé«zÁå®AiÀÄPÉÌ £ÉëĸÀ¯ÁVvÀÄÛ. DzÀgÉ, ¸ÀPÁðgÀzÀ C£ÀÄªÉÆÃzÀ£É ¥ÀqÉAiÀÄzÉÃ

PÀ£ÀßqÀ «±Àé«zÁå®AiÀÄ¢AzÀ C£ÀÄªÉÆÃzÀ£É ¥ÀqÉzÀÄ ¸ÀzÀjAiÀĪÀgÀ£ÀÄß eÁ£À¥ÀzÀ «±Àé«zÁå®AiÀÄzÀ°è

«°Ã£ÀUÉÆ½¸À¯ÁVzÉ.

(2)

¸ÀzÀjAiÀĪÀgÀÄ PÀ£ÀßqÀ «±Àé«zÁå®AiÀÄzÀ°è G¥ÀPÀÄ®¸ÀaªÀgÁVzÀÄÝ (¨ÉÆÃzsÀPÉÃvÀgÀ), eÁ£À¥ÀzÀ «±Àé«zÁå®AiÀÄzÀ°è

¥ÁæzsÁå¥ÀPÀgÀ ºÀÄzÉÝAiÀÄ£ÀÄß ¤ÃqÀ®Ä ¢:11-04-2014gÀ ¹ArPÉÃmï ¸À¨sÉAiÀÄÄ wêÀiÁð¤¸À¯ÁVzÉ. ¸ÀPÁðgÀzÀ

¤AiÀĪÀÄUÀ¼À°è ¨ÉÆÃzsÀPÉÃvÀgÀ ºÀÄzÉݬÄAzÀ ¨ÉÆÃzsÀPÀ ºÀÄzÉÝUÉ «°Ã£ÀUÉÆ½¸ÀĪÀ CªÀPÁ±À«gÀĪÀÅ¢®è.

(3)

¸ÀPÁðj DzÉñÀ ¸ÀA. Er 251 AiÀÄÄJ£ïE 2011, ¢£ÁAPÀ 16-04-2012gÀ°è ¸ÀPÁðgÀªÀÅ eÁ£À¥ÀzÀ

«±Àé«zÁå®AiÀÄzÀ ««zsÀ ¨ÉÆÃzsÀPÀ ªÀÄvÀÄÛ ¨ÉÆÃzsÀPÉÃvÀgÀ ºÀÄzÉÝUÀ¼À£ÀÄß ¨sÀwð ªÀiÁqÀ®Ä C£ÀÄªÉÆÃzÀ£É

¤ÃqÀ¯ÁVzÉ. EzÀgÀ°è ªÀÄÆgÀÄ ¥ÁæzsÁå¥ÀPÀgÀ ºÀÄzÉÝUÀ¼ÀÄ ¸ÉÃjgÀÄvÀÛªÉ. F ªÀÄÆgÀÄ ºÀÄzÉÝUÀ½UÉ CfðUÀ¼À£ÀÄß

DºÁ餹, ¸ÀÆPÀÛ C¨sÀåyðUÀ¼À£ÀÄß ¸ÀAzÀ±Àð£ÀzÀ ªÀÄÆ®PÀ ¤AiÀĪÀiÁ£ÀĸÁgÀ ¨sÀwð ªÀiÁrPÉÆ¼Àî¨ÉÃPÁVzÀÄÝ, DzÀgÉ,

EzÀgÀ°è MAzÀÄ ºÀÄzÉÝAiÀÄ£ÀÄß, «±Àé«zÁå®AiÀÄzÀ eÁ£À¥ÀzÀ ¨sÁµÁAvÀgÀ PÉÃAzÀæzÀ qÉÊgÉPÀÖgï PÀA ¥ÁæzsÁå¥ÀPÀgÀ

ºÀÄzÉÝAiÉÄAzÀÄ ¥ÀzÀ£Á«ÄÃPÀj¹ ²æÃ ¥ÉæÃªÀÄPÀĪÀiÁgï EªÀjUÉ «ÄøÀ°lÄÖ, ¸ÀzÀj ºÀÄzÉÝUÉ ²æÃAiÀÄÄvÀgÀ£ÀÄß

«°Ã£ÀUÉÆ½¸À¯ÁVzÉ JAzÀÄ ¢£ÁAPÀ: 11-04-2014gÀ ¹ArPÉÃmï ¸À¨sÉAiÀÄ wêÀiÁð£ÀzÀ°è PÀAqÀÄ §gÀÄvÀÛzÉ.

EzÀÄ ªÀÄÄPÀÛ ¸ÀàzsÁð ¹zÁÞAvÀPÉÌ «gÀÄzÀÞªÁVgÀÄvÀÛzÉ.

606

PÀ£ÁðlPÀ gÁdå¥ÀvÀæ, UÀÄgÀĪÁgÀ, ªÉÄà 31, 2018

¨sÁUÀ 1

(4)

¤AiÉÆÃd£É ªÉÄÃgÉUÉ £ÉëĹgÀĪÀ ¸ÀzÀjAiÀĪÀgÀ£Éà ¥Àæ¨sÁj ¤zÉÃð±ÀPÀgÀ£ÁßV ªÀiÁqÀ¯ÁVzÉ £ÀAvÀgÀ ¨sÁµÁAvÀgÀ

PÉÃAzÀæzÀ qÉÊgÉPÀÖgï PÀA ¥ÁæzsÁå¥ÀPÀgÀ ºÀÄzÉÝUÉ «°Ã£ÀUÉÆ½¸À¯ÁVzÉ. M§â ¸ÀPÁðj £ËPÀgÀjUÉ F vÀgÀºÀ ¸Ë®¨sÀå

¤ÃqÀĪÀ CªÀ±ÀåPÀvÉ PÀAqÀÄ §gÀĪÀÅ¢®è.

¸ÀzÀj ¹ArPÉÃmï ¸À¨sÉAiÀÄ°è ¤AiÀĪÀĨÁ»gÀ wêÀiÁð£À vÉUÉzÀÄPÉÆAqÀ PÁgÀtPÁÌV PÀ£ÁðlPÀ «±Àé«zÁå®AiÀÄzÀ C¢ü¤AiÀĪÀÄ, 2011gÀ

¥ÀæPÀgÀt 8 gÀ£ÀéAiÀÄ KPÉ gÀzÀÄÝUÉÆ½¸À¨ÁgÀzÉA§ÄzÀPÉÌ «ªÀgÀuÉ ¤ÃqÀĪÀAvÉ PÀÄ®¸ÀaªÀjUÉ PÉÆÃgÀ¯ÁV, ªÉÄÃ¯É NzÀ¯ÁzÀ (2)gÀ ¥ÀvÀæzÀ°è

PÀÄ®¸ÀaªÀgÀÄ,

eÁ£À¥ÀzÀ

«±Àé«zÁå®AiÀÄ

EªÀgÀÄ

«ªÀgÀuÉAiÀÄ£ÀÄß

¤ÃrgÀÄvÁÛgÉ.

qÁ:

¥ÉæÃªÀÄPÀĪÀiÁgï

EªÀgÀ£ÀÄß

¥Àæ¨sÁj

¤zÉÃð±ÀPÀgÀ£ÁßV ªÀiÁqÀ¯ÁzÀ £ÀAvÀgÀ ¨sÁµÁAvÀgÀ PÉÃAzÀæzÀ qÉÊgÉPÀÖgï PÀA ¥ÁæzsÁå¥ÀPÀgÀ ºÀÄzÉÝUÉ «°Ã£ÀUÉÆ½¸À®Ä PÀÄ®¥ÀwUÀ¼ÀÄ, PÀ£ÁðlPÀ

eÁ£À¥ÀzÀ «±Àé«zÁå®AiÀÄ EªÀgÀ MvÁÛAiÀÄ ¥ÀƪÀðPÀªÁV PÀæªÀÄ PÉÊUÉÆ¼Àî¯ÁVzÉ JAzÀÄ w½¸ÀÄvÁÛ, PÀ£ÁðlPÀ eÁ£À¥ÀzÀ «±Àé«zÁå®AiÀÄzÀ

C¢ü¤AiÀĪÀÄ 2011gÀ ¥ÀæPÀgÀt 8gÀ£ÀéAiÀÄ ¹ArPÉÃmï£À wêÀiÁð£ÀzÀ PÀÄjvÀÄ ¸ÀÆPÀÛ ¤tðAiÀĪÀ£ÀÄß ¸ÀPÁðgÀªÀÅ vÉUÉzÀÄPÉÆ¼ÀÀÄzÁVzÉ JAzÀÄ

w½¹gÀÄvÁÛgÉ.

ªÉÄîÌAqÀ J¯Áè CA±ÀUÀ¼À£ÀÄß PÀÄ®APÀƵÀªÁV ¥Àj²Ã°¸À¯Á¬ÄvÀÄ. CzÀgÀAvÉ, F PɼÀPÀAqÀ DzÉñÀ.

¸ÀPÁðj DzÉñÀ ¸ÀASÉå : Er 590 AiÀÄÄJ£ïE 2014, ¨ÉAUÀ¼ÀÆgÀÄ ¢£ÁAPÀ : 07-05-2015

¥Àæ¸ÁÛªÀ£ÉAiÀÄ°è «ªÀj¹gÀĪÀ CA±ÀUÀ¼À »£É߯ÉAiÀİè, qÁ: ¥ÉæÃªÀiïPÀĪÀiÁgï EªÀgÀ£ÀÄß PÀ£ÁðlPÀ eÁ£À¥ÀzÀ «±Àé«zÁå®AiÀÄzÀ eÁ£À¥ÀzÀ

¨sÁµÁAvÀgÀ PÉÃAzÀæzÀ qÉÊgÉPÀÖgï PÀA ¥ÁæzsÁå¥ÀPÀgÀ ºÀÄzÉÝAiÀÄ°è «°Ã£ÀUÉÆ½¸À®Ä ¢£ÁAPÀ: 11-04-2014gÀAzÀÄ vÉUÉzÀÄPÉÆAqÀ ¹ArPÉÃmï ¸À¨sÉAiÀÄ

«µÀAiÀÄ ¸ÀÆa-9gÀ ¤tðAiÀĪÀÅ PÁ£ÀÆ£ÀÄ «gÀÄzÀÞªÁVgÀÄvÀÛzÉ.

DzÀÝjAzÀ, PÀ£ÁðlPÀ eÁ£À¥ÀzÀ «±Àé«zÁå®AiÀÄzÀ C¢ü¤AiÀĪÀÄ 2011gÀ ¥ÀæPÀgÀt 8gÀ£ÀéAiÀÄ ¢£ÁAPÀ: 11-04-2014 gÀAzÀÄ £ÀqÉzÀ

¹ArPÉÃmï ¸À¨sÉAiÀÄ «µÀAiÀÄ ¸ÀÆa-9 gÀ ¤tðAiÀĪÀ£ÀÄß ¸ÀPÁðgÀªÀÅ F PÀÆqÀ¯Éà eÁjUÉ §gÀĪÀAvÉ gÀzÀÄÝUÉÆ½¸À¯ÁVzÉ. qÁ: ¥ÉæÃªÀÄPÀĪÀiÁgï

EªÀgÀ£ÀÄß ¸ÀPÁðgÀzÀ ¥ÀvÀæ ¸ÀASÉå: Er 13 PÉ«« 2012, ¢£ÁAPÀ: 04-07-2012 gÀ°è PÀ£ÀßqÀ «±Àé«zÁå®AiÀÄ, ºÀA¦ EAzÀ PÀ£ÁðlPÀ eÁ£À¥ÀzÀ

«±Àé«zÁå®AiÀÄPÉÌ ¤AiÉÆÃd£É ªÉÄÃ¯É ºÉÆgÀr¹gÀĪÀ DzÉñÀªÀ£ÀÄß »A¥ÀqÉAiÀÄÄvÁÛ, ¸ÀzÀjAiÀĪÀgÀ ¸ÉêÉAiÀÄ£ÀÄß ªÀiÁvÀÈ E¯ÁSÉAiÀiÁzÀ PÀ£ÀßqÀ

«±Àé«zÁå®AiÀÄ, ºÀA¦ E°èUÉ »A¢gÀÄV¸À¯ÁVzÉ.

F ¸ÀA§AzsÀ ¤AiÀĪÀĨÁ»gÀªÁV ¸ÀzÀjAiÀĪÀjUÉ AiÀÄÄf¹ ªÉÃvÀ£ÀªÀ£ÀÄß «¸ÀÛj¹gÀĪÀÅzÀjAzÀ ¸ÀPÁðgÀPÉÌ GAmÁVgÀĪÀ £ÀµÀÖªÀ£ÀÄß

¸ÀzÀjAiÀĪÀjAzÀ ªÀ¸Àư ªÀiÁqÀ®Ä ªÀÄvÀÄÛ F §UÉÎ vÉUÉzÀÄPÉÆAqÀ PÀæªÀÄzÀ §UÉÎ ¸ÀPÁðgÀPÉÌ F DzÉñÀ ºÉÆgÀr¹zÀ MAzÀÄ ªÁgÀzÉÆ¼ÀUÉ ªÀgÀ¢

¤ÃqÀĪÀÅzÀÄ.

P.R. 305

SC. 50

PÀ£ÁðlPÀ gÁdå¥Á®gÀ DeÁÕ£ÀĸÁgÀ ªÀÄvÀÄÛ CªÀgÀ ºÉ¸Àj£À°è,

¸ÀAzsÁå J¯ï. £ÁAiÀÄPï

¸ÀPÁðgÀzÀ C¢üãÀ PÁAiÀÄðzÀ²ð,

G£ÀßvÀ ²PÀët E¯ÁSÉ («±Àé«zÁ央AiÀÄUÀ¼ÀÄ).

¹§âA¢ ªÀÄvÀÄÛ DqÀ½vÀ ¸ÀÄzsÁgÀuÉ ¸ÀaªÁ®AiÀÄ

¸ÉÃ¥ÀðqÉ DzÉñÀ

¸ÀASÉå : ¹D¸ÀÄE 88 ¸ÉÃ¯ÉÆÃAiÀÄÄ 2016, ¨ÉAUÀ¼ÀÆgÀÄ, ¢£ÁAPÀ : 07-02-2018.

¸ÀªÀÄ ¸ÀASÉåAiÀÄ ¸ÀPÁðgÀzÀ DzÉñÀ ¢£ÁAPÀ : 22-06-2016gÀ DzÉñÀzÀ ¨sÁUÀzÀ°è PÀArPÉ 3gÀ £ÀAvÀgÀ, PɼÀPÀAqÀ PÀArPÉ 3(C)£ÀÄß

¸ÉÃ¥ÀðqÉ ªÀiÁr N¢PÉÆ¼ÀîvÀPÀÌzÀÄÝ :-

"3(C)

E¯ÁSÁ «ZÁgÀuÉ CxÀªÁ Qæ«Ä£À¯ï ªÉÆPÀzÀݪÉÄ JzÀÄj¸ÀÄwÛgÀĪÀ AiÀiÁªÀÅzÉà C¢üPÁjAiÀÄ£ÀÄß ªÀÄÄRå

eÁUÀÈvÀ C¢üPÁj/eÁUÀÈvÀ C¢üPÁjAiÀÄ£ÁßV £ÉëĸÀvÀPÀÌzÀÝ®è ;

MAzÀÄ ªÉüÉ, ¥ÀzÀ¤«ÄvÀÛ «zsÁ£ÀzÀ°è (on ex-officio basis) ªÀÄÄRå eÁUÀÈvÀ C¢üPÁj/eÁUÀÈvÀ

C¢üPÁjAiÀiÁV ¥ÀzÀUÀ滸ÀĪÀ AiÀiÁªÀÅzÉà C¢üPÁjAiÀÄÄ E¯ÁSÁ «ZÁgÀuÉ CxÀªÁ Qæ«Ä£À¯ï ªÉÆPÀzÀݪÉÄ

JzÀÄj¸ÀÄwÛzÀݰè, CzÉà E¯ÁSÉ/PÀbÉÃjAiÀİè£À vÀvÀìªÀiÁ£À ªÀÈAzÀzÀ EvÀgÉ C¢üPÁjUÉ ªÀÄÄRå eÁUÀÈvÀ

C¢üPÁj/eÁUÀÈvÀ C¢üPÁjAiÀÄ dªÁ¨ÁÝjAiÀÄ£ÀÄß ªÀ»¸ÀvÀPÀÌzÀÄÝ. MAzÀÄ ªÉüÉ, vÀvÀìªÀiÁ£À ªÀÈAzÀzÀ C¢üPÁj

®¨sÀå«®è¢zÀݰè, ¥Àæ¸ÀÄÛvÀ ªÀÄÄRå eÁUÀÈvÀ C¢üPÁj/eÁUÀÈvÀ C¢üPÁjAiÀÄ ¥ÀzÀ¤«ÄvÀÛ ¥ÀzÀ£ÁªÀÄzÀ

(ex-officio

designation) £ÀAvÀgÀzÀ C¢üPÁjUÉ (Officer

next

in

seniority) ªÀÄÄRå eÁUÀÈvÀ

C¢üPÁj/eÁUÀÈvÀ C¢üPÁjAiÀÄ dªÁ¨ÁÝjAiÀÄ£ÀÄß ªÀ»¸ÀvÀPÀÌzÀÄÝ."

P.R. 306

SC. 200

PÀ£ÁðlPÀ gÁdå¥Á®gÀ DzÉñÀzÀ ªÉÄÃgÉUÉ ªÀÄvÀÄÛ CªÀgÀ ºÉ¸Àj£À°è,

ºÉêÀiÁªÀw

¸ÀPÁðgÀzÀ C¢üãÀ PÁAiÀÄðzÀ²ð (¥Àæ),

¹§âA¢ ªÀÄvÀÄÛ DqÀ½vÀ ¸ÀÄzsÁgÀuÉ E¯ÁSÉ. (eÁUÀÈw «¨sÁUÀ).

¨sÁUÀ 1

PÀ£ÁðlPÀ gÁdå¥ÀvÀæ, UÀÄgÀĪÁgÀ, ªÉÄà 31, 2018

607

COMMERCE & INDUSTRIES SECRETARIAT

Sub :

Approval to the project proposl of M/s. Wistron Infocomm Manufacturing India Pvt. Ltd. to establish a unit

for manufacture of “Smart phones, IOT Products and Biotech Devices” at Achchathanahalli Village,

Narasapura Industrial Area, Kolar Taluk and District.

Read :

1) Proceedings of the 48

th Land Audit Committee (LAC) meeting held on 12-02-2018.

2) Proceedings of the 50

th State High Level Clearance Committee (SHLCC) meeting held on 23-02-2018.

Preamble:

M/s. Wistron Infocomm Manufacturing India Pvt. Ltd. has proposed to establish a unit for manufacture of “Smart phones, IOT

Products and Biotech Devices” with an investment of `. 682.00 crore, generating employment to about 6000 persons at

Achchathanahalli Village, Narasapura Industrial Area, Kolar Taluk and District.

The proposal of the company has been placed before the 48

th LAC meeting held on 12-02-2018. The decision of the LAC is as

follows :

The committee after detailed discussions, resolved to recommend to SHLCC for approval of the project of M/s. Wistron

Infocomm Manufacturing India Pvt. Ltd. to establish a unit for manufacture of “Smart phones, IOT Products and Biotech Devices” in 43

acres of KIADB land in various Sy.Nos of Achchathanahalli Village, Narasapura Industrial Area, Kolar Taluk and District.

The proposal was examined and approved in the 50

th State High Level Clearance Committee (SHLCC) Meeting held on

23-02-2018.

Government has examined the recommendations made by the SHLCC in all aspects.

Hence the following Order.

GOVERNMENT ORDER NO. CI 64 SPI 2018, BENGALURU, DATED: 02-03-2018.

Government is pleased to accord in-principle approval to the investment proposal of M/s. Wistron Infocomm Manufacturing

India Pvt. Ltd. to establish a unit for manufacture of “Smart phones, IOT Products and Biotech Devices”, with an investment of

`. 682.00 crore at Achchathanahalli Village, Narasapura Industrial Area, Kolar Taluk and District. generating employment to about 6000

persons with the following infrastructure assistances, incentives and concessions:

Land :

KIADB to allot 43 acres of contiguous land in various Sy.Nos of Achchathanahalli Village,

Narasapura Industrial Area, kolar Taluk and District

Water :

2,00,000 LPD from KIADB

Power :

4300 KVA from BESCOM

Incentive & concessions :

a)

As per Industrial Policy / ESDM Policy of the State.

b)

Special Incentives and Concessions sought by the company may be considered separately.

Sanction of the above infrastructure facilities, incentives and concessions is subject to the following terms and

conditions :

1.

Environment : The company to obtain Consent for Establishment and Consent for Operation from KSPCB and

environmental clearance from MoEF, Govt. of India or the Dept of Forest, Ecology & Environment, Govt. of

Karnataka, if applicable.

2.

Employment : The Company shall comply with the provisions of applicable Policy of Govt. of Karnataka with respect

to local employment on the project. Prepare a plan for development of Human Resources required for the project,

train local people. A copy of Human Resources Development plan shall be sent to the Commissioner for Industrial

Development & Director of Industries and Commerce for monitoring.

3.

Vendor Development : Wherever there is scope for vendor development for the project, the company shall prepare

a vendor development plan, develop local vendors and procure the required inputs, components and sub-assemblies

form these local vendor units. A copy of the vendor development plan shall be sent to the Commissioner for

Industrial Development & Director of Industries and Commerce for monitoring.

4.

Social Infrastructure Development: The Company is advised to take up social infrastructure development projects

in the vicinity of the proposed location of the unit and comply with the stipulation of Company Act 2013. A copy of

such projects shall be sent to the Commissioner for Industrial Development & Director of Industries and Commerce

for monitoring.

5.

Others:

a)

The company shall adopt rainwater harvesting, waste water recycling and water conservation techniques. Zero

discharge facility should be adopted wherever applicable.

b)

The company shall take all statutory and other necessary clearances from the competent authorities including

Govt. of India.

608

PÀ£ÁðlPÀ gÁdå¥ÀvÀæ, UÀÄgÀĪÁgÀ, ªÉÄà 31, 2018

¨sÁUÀ 1

c)

As part of “Ease of Doing Business” Government vide Order No. CI 89 SPI 2013, Dated: 20-12-2014 has

accorded approval to operationalise e-Udyami Phase II for obtaining various clearances/ approvals / licenses

etc. through common e-platform for the projects approved through District Level Single Widow Clearance

Committee (DLSWCC) or State Level Single’ Window Clearance Committee (SLSWCC) or State High Level

Clearance Committee (SHLCC) w.e.f. 01-01-2015.

d)

The approvals / NOCs of following Departments have been covered under Phase II e-Udyami.

i.

Karnataka Industrial Areas Development Board.

ii.

Karnataka Small Scale Industries Development Corporation.

iii.

Karnataka State Pollution Control Board.

iv.

Factories, Boilers, Industrial Safety and Health Department

v.

Industries and Commerce Department

vi.

Town Planning Department and Local Planning Authorities

vii.

Municipal Administration Department

viii.

BESCOM/ GESCOM/ HESCOM/ CESCOM/ MESCOM

ix.

Karnataka State Fire and Emergency Services Department

x.

Water Resources Department

e)

The login and passwords which are used for filing application through e-Udyami Phase I are also applicable for

filing application through e-Udyami Phase II . E-Udyami Phase II web application may be accessed through

www.ebizkarnataka.gov.in and online application along with necessary documents may please be filed for

any of above Departments’ approval / NOCs.

f)

Karnataka Udyog Mitra (KUM) would provide the necessary escort services for the speedy implementation of

your project. You are requested to inform the progress made in the implementation of the project every quarter

in the proforma.

This approval is valid for a period of two years from the date of issue of this Government Order.

PR-234

SC-10

By Order and in the name of the Governor of Karnataka,

G . NAGARATHANAMMA

Desk Officer (Technical Cell)

Commerce & Industries Department.

COMMERCE & INDUSTRIES SECRETARIAT

Sub :

Approval to the project proposal of M/s. Sutlej Textiles and Industries Ltd. to establish a unit for manufacture

of “Technical Textiles and Active Wear Fabrics” at Badanaguppe-Kellamballi Industrial Area,

Chamarajanagara Taluk & District.

Read :

1) Proceedings of the 48

th Land Audit Committee (LAC) meeting held on 12-02-2018.

2) Proceedings of the 50

th State High Level Clearance Committee (SHLCC) meeting held on 23-02-2018.

Preamble :

M/s. Sutlej Textiles and Industries Ltd. has proposed to establish a unit for manufacture of “Technical Textiles and Active Wear

Fabrics” with an investment of `. 786.00 crore, generating employment to about 1800 persons at Badanaguppe-Kellamballi Industrial

Area, Chamarajanagara Taluk & District.

The proposal of the company has been placed before the 48

th LAC meeting held on 12-02-2018. The decision of the LAC is as

follows :

The committee after detailed discussions, resolved to recommend to SHLCC for approval of the project of M/s. Sutlej Textiles

and Industries Ltd. to establish a unit for manufacture of “Technical Textiles and Active Wear Fabrics”and KIADB to allot 46 acres of

land at Plot No. 146 in Badanaguppe-Kellamballi Industrial Area, Chamarajanagara Taluk & District.

The proposal was examined and approved in the 50

th State High Level Clearance Committee (SHLCC) Meeting held

on 23-02-2018.

Government has examined the recommendations made by the SHLCC in all aspects.

Hence the following Order.

GOVERNMENT ORDER NO. CI 65 SPI 2018, BENGALURU, DATED: 02-03-2018.

Government is pleased to accord in-principle approval to the investment proposal of M/s Sutlej Textiles and Industries Ltd. to

establish a unit for manufacture of “Technical Textiles and Active Wear Fabrics”, with an investment of `. 786.00 crore at

¨sÁUÀ 1

PÀ£ÁðlPÀ gÁdå¥ÀvÀæ, UÀÄgÀĪÁgÀ, ªÉÄà 31, 2018

609

Badanaguppe-Kellamballi Industrial Area, Chamarajanagara Taluk & District, generating employment to about 1800 persons with the

following infrastructure assistances, incentives and concessions:

Land :

KIADB to allot 46 acres of land at Plot No.146 in Badanaguppe-Kellamballi Industrial Area,

Chamarajanagara Taluk and District

Water :

36,00,000 LPD from KIADB

Power :

11722.5 KVA from CESCOM

Incentive & concessions :

a)

As per Textile Policy of the State.

b)

Special Incentives and Concessions sought by the company may be considered separately.

Sanction of the above infrastructure facilities, incentives and concessions is subject to the following terms and

conditions :

1

Environment : The company to obtain Consent for Establishment and Consent for Operation from KSPCB and

environmental clearance from MoEF, Govt. of India or the Dept of Forest, Ecology & Environment, Govt. of

Karnataka, if applicable.

2

Employment : The Company shall comply with the provisions of Textile Policy of Govt. of Karnataka with respect

to local employment on the project. Prepare a plan for development of Human Resources required for the project,

train local people. A copy of Human Resources Development plan shall be sent to the Commissioner for Industrial

Development & Director of Industries and Commerce for monitoring.

3

Vendor Development : Wherever there is scope for vendor development for the project, the company shall

prepare a vendor development plan, develop local vendors and procure the required inputs, components and sub-

assemblies from these local vendor units. A copy of the vendor development plan shall be sent to the

Commissioner for Industrial Development & Director of Industries and Commerce for monitoring.

4.

Social Infrastructure Development: The Company is advised to take up social infrastructure development

projects in the vicinity of the proposed location of the unit and comply with the stipulation of Company Act, 2013. A

copy of such projects shall be sent to the Commissioner for Industrial Development & Director of Industries and

Commerce for monitoring.

5.

Others:

a)

The company shall adopt rainwater harvesting, waste water recycling and water conservation techniques.

Zero discharge facility should be adopted wherever applicable.

b)

The company shall take all statutory and other necessary clearances from the competent authorities including

Govt. of India.

c)

As part of “Ease of Doing Business” Government vide Order No. CI 89 SPI 2013, Dated: 20-12-2014 has

accorded approval to operationalise e-Udyami Phase II for obtaining various clearances/ approvals / licenses

etc. through common e-platform for the projects approved through District Level Single Window Clearance

Committee (DLSWCC) or State Level Single’ Window Clearance Committee (SLSWCC) or State High Level

Clearance Committee (SHLCC) w.e.f. 01-01-2015.

d)

The approvals / NOCs of following Departments have been covered under Phase II e-Udyami.

i)

Karnataka Industrial Areas Development Board.

ii)

Karnataka Small Scale Industries Development Corporation.

iii)

Karnataka State Pollution Control Board.

iv)

Factories, Boilers, Industrial Safety and Health Department

v)

Industries and Commerce Department

vi)

Town Planning Department and Local Planning Authorities

vii)

Municipal Administration Department

viii)

BESCOM/ GESCOM/ HESCOM/ CESCOM/ MESCOM

ix)

Karnataka State Fire and Emergency Services Department

x)

Water Resources Department

e)

The login and passwords which are used for filing application through e-Udyami Phase I are also applicable

for filling application through e-Udyami Phase II. E-Udyami Phase II web application may be accessed

through www.ebizkarnataka.gov.in and online application along with necessary documents may please be

filed for any of above Departments’ approval / NOCs.

610

PÀ£ÁðlPÀ gÁdå¥ÀvÀæ, UÀÄgÀĪÁgÀ, ªÉÄà 31, 2018

¨sÁUÀ 1

f)

Karnataka Udyog Mitra (KUM) would provide the necessary escort services for the speedy implementation of

your project. You are requested to inform the progress made in the implementation of the project every

quarter in the proforma.

This approval is valid for a period of two years from the date of issue of this Government Order.

PR-235

SC-10

By Order and in the name of the Governor of Karnataka,

G . NAGARATHNAMMA

Desk Officer (Technical Cell)

Commerce & Industries Department.

COMMERCE & INDUSTRIES SECRETARIAT

Sub :

Approval to the project proposal of M/s.Anjalitai Canes Pvt. Ltd. to establish “5000 TCD Sugar

Plant, 30 MW Co-gen & 60 KLPD Distillery” at Halaga Village, Beedri Revenue Circle,

Khanapura Taluk, Belagavi District.

Read :

1) Proceedings of the 47

th Land Audit Committee (LAC) meeting held on 23-01-2018.

2) Proceedings of the 50

th State High Level Clearance Committee (SHLCC) meeting held on

23-02-2018.

Preamble :

M/s.Anjalitai Canes Pvt. Ltd. has proposed to establish “5000 TCD Sugar Plant, 30 MW Co-gen & 60 KLPD Distillery”, with an

investment of `. 532.00 crore, generating employment to about 800 persons at Halaga Village, Beedri Revenue Circle, Khanapura

Taluk, Belagavi District.

The representatives of the company appeared before the 47

th LAC meeting held on 23-01-2018 and highlighted the project

proposal.

Commissioner for Industrial Development and Director of Industries and Commerce informed that, as per the application the

company has no business transactions during the previous years and also the net worth of the company and promoters does not

support the equity requirement of the project.

The representative of the company informed that they are planning to allot shares of the company to Cane growers and also get

private equity for the project.

Commissioner for Industrial development and Director of Industries and Commerce informed the company to furnish details of

the financial arrangements made for the project.

The Committee noted the request of the company and after detailed discussions and subject to furnishing of relevant documents

on financial arrangements, resolved to recommend to SHLCC for approval of the project of M/s. Anjalitai Canes Private Limited to

establish “5000 TCD Sugar Plant, 30 MW Co-gen, & 60 KLPD Distillery” in 31 acre 12 guntas of land to be purchased U/s 109 of KLR

Act at Sy.No. 36 of Halaga Village, Beedri Revenue Circle, Khanapura Taluk, Belagavi District.

The proposal was examined and approved and subject to allocation of cane area by the competent authority in the 50

th State

High Level Clearance Committee (SHLCC) Meeting held on 23-02-2018.

Government has examined the recommendations made by the SHLCC in all aspects.

Hence the following Order.

GOVERNMENT ORDER NO. CI 66 SPI 2018, BENGALURU, DATED: 02-03-2018.

Government is pleased to accord in-principle approval to the investment proposal of M/s.Anjalitai Canes Pvt. Ltd. to establish

“5000 TCD Sugar Plant, 30 MW Co-gen & 60 KLPD Distillery” with an investment of `. 532.00 crore at Halaga Village, Beedri Revenue

Circle, Khanapura Taluk, Belagavi District, generating employment to about 800 persons with the following infrastructure assistances,

incentives and concessions subject to allocation of cane area by the competent authority :

Land :

31 acre 12 guntas of land to be purchased U/s 109 of KLR Act at Sy.No.36 of Halaga

Village, Beedri Revenue Circle, Khanapura Taluk, Belagavi District.

Water :

966000 LPD from Malaprabha River.

Power :

1250 KVA from HESCOM

Incentive & concessions :

As per Industrial Policy of the State.

Sanction of the above infrastructure facilities, incentives and concessions is subject to the following terms and

conditions :

1.

Environment : The company to obtain Consent for Establishment and Consent for Operation from KSPCB and

environmental clearance from MoEF, Govt. of India or the Dept of Forest, Ecology & Environment, Govt. of

Karnataka, if applicable.

¨sÁUÀ 1

PÀ£ÁðlPÀ gÁdå¥ÀvÀæ, UÀÄgÀĪÁgÀ, ªÉÄà 31, 2018

611

2.

Employment : The Company shall comply with the provisions of Industrial Policy of Govt. of Karnataka with

respect to local employment on the project. Prepare a plan for development of Human Resources required for the

project, train local people. A copy of Human Resources Development plan shall be sent to the Commissioner for

Industrial Development & Director of Industries and Commerce for monitoring.

3.

Vendor Development : Wherever there is scope for vendor development for the project, the company shall

prepare a vendor development plan, develop local vendors and procure the required inputs, components and sub-

assembilies form these local vendor units. A copy of the vendor development plan shall be sent to the

Commissioner for Industrial Development & Director of Industries and Commerce for monitoring.

4.

Social Infrastructure Development: The Company is advise to take up social infrastructure development projects

in the vicinity of the proposed location of the unit and comply with the stipulation of Company Act, 2013. A copy of

such projects shall be sent to the Commissioner for Industrial Development & Director of Industries and Commerce

for monitoring.

5.

Others:

a)

The company shall adopt rainwater harvesting, waste water recycling and water conservation techniques.

Zero discharge facility should be adopted wherever applicable.

b)

The company shall take all statutory and other necessary clearances from the competent authorities including

Govt. of India.

c)

As part of “Ease of Doing Business” Government vide Order No. CI 89 SPI 2013, Dated: 20-12-2014 has

accorded approval to operationalise e-Udyami Phase II for obtaining various clearances/ approvals / licenses

etc. through common e-platform for the projects approved though District Level Single Widow Clearance

Committee (DLSWCC) or State Level Single’ Window Clearance Committee (SLSWCC) or State High Level

Clearance Committee (SHLCC) w.e.f. 01-01-2015.

d)

The approvals / NOCs of following Departments have been covered under Phase II e-Udyami.

i)

Karnataka Industrial Areas Development Board.

ii)

Karnataka Small Scale Industries Development Corporation.

iii)

Karnataka State Pollution Control Board.

iv)

Factories, Boilers, Industrial Safety and Health Department

v)

Industries and Commerce Department

vi)

Town Planning Department and Local Planning Authorities

vii)

Municipal Administration Department

viii)

BESCOM/ GESCOM/ HESCOM/ CESCOM/ MESCOM

ix)

Karnataka State Fire and Emergency Services Department

x)

Water Resources Department

e)

The login and passwords which are used for filing application through e-Udyami Phase I are also applicable

for filling application through e-Udyami Phase II. E-Udyami Phase II web application may be accessed

through www.ebizkarnataka.gov.in and online application along with necessary documents may please be

filed for any of above Departments’ approval / NOCs.

f)

Karnataka Udyog Mitra (KUM) would provide the necessary escort services for the speedy implementation of

your project. You are requested to inform the progress made in the implementation of the project every

quarter in the proforma.

This approval is valid for a period of two years from the date of issue of this Government Order.

PR-236

SC-10

By Order and in the name of the Governor of Karnataka,

G . NAGARATHNAMMA

Desk Officer (Technical Cell)

Commerce & Industries Department.

COMMERCE & INDUSTRIES SECRETARIAT

Sub :

Approval to the project proposal of M/s.BPK Developments LLP to establish “IT / ITES Office spaces,

Hotel, Service Apartments and Common Facilities” at Doddanekkundi and Mahadevpura Villages,

Bengaluru East Taluk, Bengaluru urban District.

Read :

1) Proceedings of the 48

th Land Audit Committee (LAC) meeting held on 12-02-2018.

2) Proceedings of the 50

th State High Level Clearance Committee (SHLCC) meeting held on 23-02-2018.

612

PÀ£ÁðlPÀ gÁdå¥ÀvÀæ, UÀÄgÀĪÁgÀ, ªÉÄà 31, 2018

¨sÁUÀ 1

Preamble :

M/s.BPK Developments LLP has proposed to establish “IT / ITES Office spaces, Hotel, Service Apartments and Common

Facilities” with an investment of `. 3495.15 crore, generating employment to about 50000 persons at Doddanekkundi and Mahadevpura

Villages, Bengaluru East Taluk, Bengaluru Urban District.

The proposal of the company has been placed before the 48

th LAC meeting held on 12-02-2018. The decision of the LAC is as

follows :

The committee after detailed discussions, resolved to recommend to SHLCC for approval of the project of M/s. BPK

Developments LLP to establish “IT/ITES Office spaces, Hotel, Service Apartments and Common Facilities” and KIADB to acquire and

allot 90 Acres and 15 Guntas of land at Sy.Nos. 51, 52, 53, 55, 64, 65, 66 including all sub-numbers in Doddanekkundi village,

Marathahalli Hobli, Bengaluru East Taluk, and Sy. Nos 98, 99, 100, 101, 108, 109 including all sub-numbers in Mahadevpura village,

Mahadevpura Hobli, Bengaluru East Taluk, Bengaluru Urban District, as SUC from KIADB on consent basis.

The proposal was examined and approved in the 50

th State High Level Clearance Committee (SHLCC) Meeting held on

23-02-2018

Government has examined the recommendations made by the SHLCC in all aspects.

Hence the following Order.

GOVERNMENT ORDER NO. CI 67 SPI 2018, BENGALURU, DATED: 02-03-2018.

Government is pleased to accord in-principle approval to the investment proposal of M/s. BPK Developments LLP to establish

“IT/ITES Office spaces, Hotel, Service Apartments and Common Facilities” with an investment of `. 3495.15 crore at Doddanekkundi

and Mahadevapura Villages, Bengaluru East Taluk, Bengaluru Urban District, generating employment to about 50000 persons with the

following infrastructure assistances, incentives and concessions:

Land :

KIADB

to

acquire

and

allot

90

Acres

and

15

Guntas

of

land

at

Sy. Nos. 51, 52, 53, 55, 64, 65, 66 including all sub-numbers in Doddanekkundi Village,

Marathahalli Hobli, Bengaluru East Taluk, and Sy. Nos 98, 99, 100, 101, 108, 109 including

all sub-numbers in Mahadevpura Village, Mahadevpura Hobli, Bengaluru East Taluk,

Bengaluru Urban District, as SUC in conformity with zonal regulations of BDA/LPA and on

consent basis.

Water :

12,50,000 LPD from BWSSB.

Power :

5000 KVA from BESCOM.

Incentive & concessions :

As per applicable Policy of the State.

Sanction of the above infrastructure facilities, incentives and concessions is subject to the following terms and

conditions :

1.

Environment : The company to obtain Consent for Establishment and Consent for Operation from KSPCB and

environmental clearance from MoEF, Govt. of India or the Dept of Forest, Ecology & Environment, Govt. of

Karnataka, if applicable.

2.

Employment : The Company shall comply with the provisions of applicable Policy of Govt. of Karnataka with

respect to local employment on the project Prepare a plan for development of Human Resources required for the

project, train local people. A copy of Human Resources Development plan shall be sent to the Commissioner for

Industrial Development & Director of Industries and Commerce for monitoring.

3.

Vendor Development : Wherever there is scope for vendor development for the project, the company shall

prepare a vendor development plan, develop local vendors and procure the required inputs, components and sub-

assemblies from these local vendor units. A copy of the vendor development plan shall be sent to the

Commissioner for Industrial Development & Director of Industries and Commerce for monitoring.

4.

Social Infrastructure Development: The Company is advised to take up social infrastructure development

projects in the vicinity of the proposed location of the unit and comply with the stipulation of Company Act, 2013. A

copy of such projects shall be sent to the Commissioner for Industrial Development & Director of Industries and

Commerce for monitoring.

5.

Others:

a)

The company shall adopt rainwater harvesting, waste water recycling and water conservation techniques.

Zero discharge facility should be adopted wherever applicable.

b)

The company shall take all statutory and other necessary clearances from the competent authorities including

Govt. of India.

c)

As part of “Ease of Doing Business” Government vide Order No. CI 89 SPI 2013, Dated: 20-12-2014 has

accorded approval to operationalise e-Udyami Phase II for obtaining various clearances/ approvals / licenses

¨sÁUÀ 1

PÀ£ÁðlPÀ gÁdå¥ÀvÀæ, UÀÄgÀĪÁgÀ, ªÉÄà 31, 2018

613

etc. through common e-platform for the projects approved through District Level Single Window Clearance

Committee (DLSWCC) or State Level Single’ Window Clearance Committee (SLSWCC) or State High Level

Clearance Committee (SHLCC) w.e.f. 01-01-2015.

d)

The approvals / NOCs of following Departments have been covered under Phase II e-Udyami.

i)

Karnataka Industrial Areas Development Board.

ii)

Karnataka Small Scale Industries Development Corporation.

iii)

Karnataka State Pollution Control Board.

iv)

Factories, Boilers, Industrial Safety and Health Department

v)

Industries and Commerce Department

vi)

Town Planning Department and Local Planning Authorities

vii)

Municipal Administration Department

viii)

BESCOM/ GESCOM/ HESCOM/ CESCOM/ MESCOM

ix)

Karnataka State Fire and Emergency Services Department

x)

Water Resources Department

e)

The login and passwords which are used for filing application through e-Udyami Phase I are also applicable

for filling application through e-Udyami Phase II. E-Udyami Phase II web application may be accessed

through www.ebizkarnataka.gov.in and online application along with necessary documents may please be

filed for any of above Departments’ approval / NOCs.

f)

Karnataka Udyog Mitra (KUM) would provide the necessary escort services for the speedy implementation of

your project. You are requested to inform the progress made in the implementation of the project every

quarter in the proforma.

This approval is valid for a period of two years from the date of issue of this Government Order.

PR-237

SC-10

By Order and in the name of the Governor of Karnataka,

G . NAGARATHNAMMA

Desk Officer (Technical Cell)

Commerce & Industries Department.

COMMERCE & INDUSTRIES SECRETARIAT

Sub :

Approval to the project proposal of M/s.Amperia Lithium Battery Manufacturing Pvt. Ltd. to establish a unit

for manufacture of “Lithium Batteries for EV and Storage” at Gowribidanur 2

nd Phase Industrial Area,

Chikkaballapura District.

Read :

1)

Proceedings of the 48

th Land Audit Committee (LAC) meeting held on 12-02-2018.

2)

Proceedings of the 50

th State High Level Clearance Committee (SHLCC) meeting held on 23-02-2018.

Preamble :

M/s.Amperia Lithium Battery Manufacturing Pvt. Ltd. Has proposed to establish a unit for manufacture of “ Lithium Batteries for

EV and Storage”, with an investment of `. 1210.00 crore, generating employment to about 600 persons at Gowribidanur 2

nd Phase

Industrial Area, Chikkaballapura District

The representatives of the company appeared before the 48

th LAC meeting held on 12-02-2018 and informed that they have

submitted revised financials of the project and requested for allotment of 170 acres of land at Plot Nos 4, 5, 6, 7, 8, 9, 10, 14, 15, 16, 17,

19, 20, 21, 22, 23 in Gowribidanur 2

nd Phase Industrial Area, Chikkabalapura District.

CEO & EM, KIADB informed that only 88.97 acres of contiguous land comprising of Plot Nos. 4, 5, 6, 7, 8, 9, 10,17, 16, 15, 14,

13, 23, 22, 21, 20, 19, 18 was available for allotment in Gowribidanur 2

nd Phase Industrial Area and the same can be allotted to the

project.

The representatives of the company agreed to take up 88.97 acres of land as suggested by CEO & EM, KIADB for their first

phase of the project and informed that they would look into acquiring adjoining lands for further phases of the project.

The committee noted the request of the company and the opinion of CEO & EM, KIADB and after detailed discussions, resolved

to recommend to SHLCC for approval of the project of M/s. Amperia Lithium Battery Manufacturing Pvt. Ltd. to establish a unit for

manufacture of “Lithium Batteries for EV and Storage” and KIADB to allot 88.97 acres of contiguous land at Polt Nos. 4, 5, 6, 7, 8, 9, 10,

17, 16, 15, 14, 13, 23, 22, 21, 20, 19, 18 in Gowribidanur 2

nd Phase Industrial Area, Chikkabalapura District.

The proposal was examined and approved in the 50

th State High Level Clearance Committee (SHLCC) Meeting held on

23-02-2018

Government has examined the recommendations made by the SHLCC in all aspects.

614

PÀ£ÁðlPÀ gÁdå¥ÀvÀæ, UÀÄgÀĪÁgÀ, ªÉÄà 31, 2018

¨sÁUÀ 1

Hence the following Order.

GOVERNMENT ORDER NO. CI 68 SPI 2018, BENGALURU, DATED: 02-03-2018.

Government is pleased to accord in-principle approval to the investment proposal of M/s.Amperia Lithium Battery

Manufacturing Pvt. Ltd. to establish a unit for manufacture of “Lithium Batteries for EV and Storage”, with an investment of `. 1210.00

crore at Gowribidanur 2

nd Phase Industrial Area, Chikkaballapura District, generating employment to about 600 persons with the

following infrastructure assistances, incentives and concessions:

Land :

KIADB to allot 88.97 acres of contiguous land in Gowribidanur 2

nd Phase Industrial Area,

Chikkaballapura District.

Water :

40,000 LPD to be supplied by KIADB

Power :

6000 KVA from BESCOM

Incentive & concessions :

a) As per Electric Vehicle and Energy Storage Policy of the State

b) Special Incentives and Concessions sought by the company may be considered separately.

Sanction of the above infrastructure facilities, incentives and concessions is subject to the following terms and

conditions :

1.

Environment : The company to obtain Consent for Establishment and Consent for Operation from KSPCB

and environmental clearance from MoEF, Govt. of India or the Dept of Forest, Ecology & Environment, Govt.

of Karnataka, if applicable.

2.

Employment : The Company shall comply with the provisions of Electric Vehicle and Energy Storage Policy

of Govt. of Karnataka with respect to local employment on the project. Prepare a plan for development of

Human Resources required for the project, train local people. A copy of Human Resources Development plan

shall be sent to the Commissioner for Industrial Development & Director of Industries and Commerce for

monitoring.

3.

Vendor Development : Wherever there is scope for vendor development for the project, the company shall

prepare a vendor development plan, develop local vendors and procure the required inputs, components and

sub-assembilies from these local vendor units. A copy of the vendor development plan shall be sent to the

Commissioner for Industrial Development & Director of Industries and Commerce for monitoring.

4.

Social Infrastructure Development: The Company is advised to take up social infrastructure development

projects in the vicinity of the proposed location of the unit and comply with the stipulation of Company Act,

2013. A copy of such projects shall be sent to the Commissioner for Industrial Development & Director of

Industries and Commerce for monitoring.

5.

Others:

a) The company shall adopt rainwater harvesting, waste water recycling and water conservation techniques.

Zero discharge facility should be adopted wherever applicable.

b) The company shall take all statutory and other necessary clearances from the competent authorities

including Govt. of India.

c) As part of “Ease of Doing Business” Government vide Order No. CI 89 SPI 2013, Dated: 20-12-2014 has

accorded approval to operationalise e-Udyami Phase II for obtaining various clearances/ approvals /

licenses etc. through common e-platform for the projects approved through District Level Single Window

Clearance Committee (DLSWCC) or State Level Single’ Window Clearance Committee (SLSWCC) or

State High Level Clearance Committee (SHLCC) w.e.f. 01-01-2015.

d) The approvals / NOCs of following Departments have been covered under Phase II e-Udyami.

i)

Karnataka Industrial Areas Development Board.

ii)

Karnataka Small Scale Industries Development Corporation.

iii)

Karnataka State Pollution Control Board.

iv)

Factories, Boilers, Industrial Safety and Health Department

v)

Industries and Commerce Department

vi)

Town Plannig Department and Local Planning Authorities

vii)

Municipal Administration Department

viii)

BESCOM/ GESCOM/ HESCOM/ CESCOM/ MESCOM

ix)

Karnataka State Fire and Emergency Services Department

x)

Water Resources Department

¨sÁUÀ 1

PÀ£ÁðlPÀ gÁdå¥ÀvÀæ, UÀÄgÀĪÁgÀ, ªÉÄà 31, 2018

615

e)

The login and passwords which are used for filing application through e-Udyami Phase I are also applicable

for filling application through e-Udyami Phase II. E-Udyami Phase II web application may be accessed

through www.ebizkarnataka.gov.in and online application along with necessary documents may please be

filed for any of above Departments’ approval / NOCs.

f)

Karnataka Udyog Mitra (KUM) would provide the necessary escort services for the speedy implementation of

your project. You are requested to inform the progress made in the implementation of the project every

quarter in the proforma.

This approval is valid for a period of two years from the date of issue of this Government Order.

PR-238

SC-10

By Order and in the name of the Governor of Karnataka,

G . NAGARATHNAMMA

Desk Officer (Technical Cell)

Commerce & Industries Department.

COMMERCE & INDUSTRIES SECRETARIAT

Sub :

Amendment to the earlier approved project proposal of M/s. Dalmia Cement (Bharat) Ltd. – reg.

Read :

1. Government Order No. CI 75 SPI 2008, dt. 02-05-2008.

2. Government Order No. CI 75 SPI 2008, dt. 31-12-2008.

3. Government Order No. CI 01 SPI 2008(P3), dt. 06-06-2012

4. Government Order No. CI 01 SPI 2008(P3), dt. 10-12-2014

5. Proceedings of the 50

th State High Level Clearance Committee (SHLCC) meeting held on 23-02-2018..

Preamble :

Government has approved the establishment of Green Field Cement Plant of 4 Million Tonnes Capacity with 45 MW Captive

Thermal Power Generation Plant in 300 acres of land for factory and town ship and 1736.70 acres of land for mining by M/s. Dalimia

Cement (Bharath) Ltd. at Yadwad Village, Gokak Taluk, Belagavi District, with an investment of `. 1047.20 crore was approved by the

13

th SHLCC meeting held on 13-03-2008. Accordingly, Government Order was issued vide read at (1) above.

Further, the request of the company for transfer of approval from M/s. Dalmia Cement (Bharat) Ltd., to their subsidiary company

M/s. Dalmia Cement Ventures Ltd. And acquiring of additional land was approved in the 16

th SHLCC meeting held on 19-11-2008.

Accordingly, Government Order was issued vide read at (2) above.

The request of the company for extension of time to implement the project by two years and acquisition and allotment of balance

480 Acre and 5 guntas of land was approved in the 28

th SHLCC meeting held on 23-05-2012. Accordingly, Government Order was

issued vide read at (3) above.

Further, the request of the company for extension of time to implement the project by another 3 years was approved in the 36

th

SHLCC meeting held on 15-10-2014. Accordingly, Government Order No. CI 1 SPI 2008 (P3) dated: 10-12-2014 granting further 3

years time to implement the project was issued.

Now the company vide letter dated: 25-10-2017 has submitted that out of the total 3542 acres of land they have obtained

permission U/s 109 of KLR Act for on extent 1730 acres as detailed below and the project is already implemented in the year 2015.

Sl.No.

Order No.

Extent

1

RD 69 LRM 2006 dt: 26-12-2008

1103

2

RD 93 LRM 2009 dt: 29-09-2010

497

3

RD 93 LRM 2009 dt: 29-09-2016

130

Total

1730

Further, it is informed that, Director Mines & Geology has granted the Mining Lease and executed the Mineral Development

Projection Agreement on 11-01-2017 as per MMDR Act & Rules.

It is submitted that the company still has to acquire 1800 acres to complete the balance acquisition required for mininig purpose.

Hence, company has requested to accord approval for extension of time for project implementation for a further period of 5 years that is

up to year 2022.

The request of the company was discussed in the meeting which held on 08-02-2018 to discuss implementation status of

SHLCC/SLSWCC approved projects seeking amendments/extension of time, and the company was advised to submit a concrete

proposal with timelines for implementation of the project.

Accordingly, the company vide their letter dated: 16-02-2018 has submitted the implementation schedule, wherin it is submitted

that the project will be completed by the end of 2022 and hence has requested for extension of time for a further period of 5 years to

implement the project.

616

PÀ£ÁðlPÀ gÁdå¥ÀvÀæ, UÀÄgÀĪÁgÀ, ªÉÄà 31, 2018

¨sÁUÀ 1

Government has examined the recommendations made by the 50

th SHLCC in all aspects.

Hence the following Order.

GOVERNMENT ORDER NO. CI 01 SPI 2008(P3), BENGALURU, DATED: 03-03-2018.

The Government is pleased to grant extension of time to M/s. Dalmia Cement (Bharat) Ltd. At Yadwad Village, Gokak Taluk,

Belagavi District to implement the project approved vide Government Order No. CI 75 SPI 2008, dated: 02-05-2008 for further period of

five years from the date of issue of this order.

All other terms and conditions indicated in the Government Order dated: 02-05-2008 read at (1) above, remain unaltered.

PR-239

SC-10

By Order and in the name of the Governor of Karnataka,

G . NAGARATHNAMMA

Desk Officer (Technical Cell)

Commerce & Industries Department.

COMMERCE & INDUSTRIES SECRETARIAT

Sub :

Amendment to the earlier approved project proposal of M/s. Dalmia Cement (Bharat) Ltd.(DCBL) – reg.

Read :

1. Government Order No. CI 91 SPI 2008, dt. 07-05-2008.

2. Government Order No. CI 91 SPI 2008, dt. 31-12-2008.

3. Government Order No. CI 01 SPI 2008(P2), dt. 06-06-2012.

4. Government Order No. CI 01 SPI 2008(P3), dt. 28-12-2012.

5. Government Order No. CI 01 SPI 2008(P3), dt. 12-12-2014.

6. Proceedings of the 50

th State High Level Clearance Committee (SHLCC) meeting held on 23-02-2018.

Preamble :

Government has approved the establishment of Green Field Cement Plant of 4 Million Tones Capacity with 45 MW Captive

Thermal Power. Generation Plant in 400 acres of land for factory and town ship and 2500 acres of land for mining by M/s. Dalimia

Cement (Bharath) Ltd., at various Sy. Nos. of Taranalli and Konkanhalli and other Villages of Sedam Taluk, Kalaburagi District, with an

investment of `. 1027.3 Crore was approved by the 14

th SHLCC meeting held on 17-03-2008. Accordingly, Government Order was

issued vide read at (1) above.

Further, the request of the company for transfer of approval from M/s. Dalmia Cement (Bharat) Ltd., to their subsidiary company

M/s. Dalmia Cement Ventures Limited. and acquiring of additional 150 Acres of land U/s 109 of KLR Act was approved in the

16

th SHLCC meeting held on 19-11-2008. Accordingly, Government Order was issued vide read at (2) above.

The request of the company for extension of time to implement the project by two years and acquisition and allotment of balance

land was approved in the 28

th SHLCC meeting held on 23-05-2012. Accordingly, Government Order was issued vide read at (3) above.

Further, the request of the company to implement the project in the name M/s. Dalmia Cement (Bharat) Ltd. was again

considered vide Government Order read at (4) above.

The request of the company for extension of time to implement the project by another 3 years was approved in the 36

th SHLCC

meeting held on 15-10-2014. Accordingly, Government Order vide read at (5) above was issued.

Now the company vide letter dated: 06-10-2017 has submitted the details of action taken to implement the project as follows.

.Registered 540 acres of land U/s 109 of Karnataka Land reforms Act 1961 for industrial purpose, and in addition has

entered into agreement to sell for 262 acres of land in Sedam village, Kalaburagi District.

Conversion obtained for 481 acre 03 guntas of land in Konkanahalli, Beernahalli, Hosahalli & other Village, Sedam

Taluk, Kalaburagi District for the Mines area.

Invested `. 100 crore so far in purchase of land and other activities.

Obtained in principal approval for railway siding from South-Central Railway and submitted the DPR for final approval

along with charges of `. 70 Lakh.

It is submitted that project implementation is delayed due to following pending clearances:

6 1(b) clearance form Government of Karnataka

Purchase of the remaining lad for operation of the mining lease, the land acquisition will start only after grant of

Mininig Lease.

Letter of Intent from the Director Mines & Geology under 10 A 2(b) of the MMDR Act and Grant of Mining Lease for an

extent of 995.97 Hec is yet to start.

Application No: DMG: MLS: 736 AML 07:08-09/158, dated: 08-04-2009 from Department of Mines & Geoiogy for an

area of 995.97 hectares for Kalaburagi Project is under consideration as per the Section 10 A 2 (b) of the amended

Mines & Minerals Act.

¨sÁUÀ 1

PÀ£ÁðlPÀ gÁdå¥ÀvÀæ, UÀÄgÀĪÁgÀ, ªÉÄà 31, 2018

617

It is submitted that delay in getting the mining lease which is beyond the control of the company has delayed the whole project.

Hence, company has requested for extension of time for project implementation for a further period of 5 years.

The request of the company was discussed in the meeting which held on 08-02-2018 to discuss implementation status of

SHLCC/SLSWCC approved projects seeking amendments/extension of time, and the company was advised to submit a concrete

proposal with timelines for implementation of the project.

Accordingly, the company vide their letter dated: 16-02-2018 has submitted that they need 5 years time for execution of the

project from the date of grant of LOI for the associated mining lease and hence has requested for extension of time for a further period

of 5 years to implement the project.

The proposal of the company was examined in the 50

th SHLCC Meeting held on 23-02-2018 and approved.

Government has examined the recommendation made by the 50

th SHLCC in all aspects.

Hence the following Order.

GOVERNMENT ORDER NO. CI 01 SPI 2008 (P3), BENGALURU, DATED: 03-03-2018.

The Government is pleased to grant extension of time to M/s. Dalmia Cement (Bharat) Ltd. (DCBL) at various Sy. Nos. of

Taranalli and Konkanhalli and other Villages of Sedam Taluk, Kalaburagi District to implement the project approved vide Government

Order No. CI 91 SPI 2008, dated: 07-05-2008 for further period of five years from the date of issue of this order.

All other terms and conditions indicated in the Government Order No. CI 91 SPI 2008, dated: 07-05-2008 read at (1) above,

remain unaltered.

PR-240

SC-10

By Order and in the name of the Governor of Karnataka,

G . NAGARATHNAMMA

Desk Officer (Technical Cell)

Commerce & Industries Department.

COMMERCE & INDUSTRIES SECRETARIAT

Sub :

Amendment to the earlier approved project proposal of M/s. JSW Steel Ltd. –reg.

Read :

1. Proceedings of the 43

rd State High Level Clearance Committee (SHLCC) meeting held on 01-02-2016.

2. Government Order No. CI 51 SPI 2016, dated: 29-02-2016.

3. Proceedings of the 50

th State High Level Clearance Committee (SHLCC) meeting held on 23-02-2018.

Preamble :

The project proposal of M/s. JSW Steel Ltd., for “Augmenting the existing steel plant with additional manufacturing facilities” with

an investment of `. 15,529.00 crore in existing land within the existing factory premises at Toranagallu village, Sandur Taluk, Ballari

District, was approved in the 43

rd SHLCC meeting held on 01-02-2016. Accordingly Government Order was issued vide read at (2)

above. In this order it was also approved that KIADB to acquire and allot land for laying the pipeline to draw water after getting the water

pipeline alignment details along with the details of land to be acquired from the company.

Now, the company vide their letter dated: 20-06-2017 have requested for the following amendments to their earlier approved

Government Order dated: 29-02-2016.

a)

Amendment to approval Government Order by including:

“To acquire 49.61 acres of land U/s 109 of KLR Act in various Sy.Nos. of Bhujanganagar, lakshmipura and Bannihatti

Villages of Sandur Taluk, Ballari District for installation of 83 Kms long pipe conveyor to transport iron ore from mines to the

plant at Toranagallu.

b)

Change of mode of acquisition of land from KIADB to U/s 109 of KLR Act for laying the pipeline to draw water for the

project.

The proposal of the company was examined in the 50

th State High Level Clearance Committee (SHLCC) Meeting held on

23-02-2018 and approved.

Government has examined the recommendations made by the 50

th SHLCC in all aspects.

Hence the following order.

GOVERNMENT ORDER NO. CI 51 SPI 2016, BENGALURU, DATED: 02-03-2018.

Government is pleased to accord approval for the following:

a)

Amendment to approval Government Order by including:

“To acquire 49.61 acres of land U/s 109 of KLR Act in various Sy.Nos. of Bhujanganagar, lakshmipura and Bannihatti

Villages of Sandur Taluk, Ballari District for installation of 83 Kms long pipe conveyor to transport iron ore from mines to the

plant at Toranagallu.

618

PÀ£ÁðlPÀ gÁdå¥ÀvÀæ, UÀÄgÀĪÁgÀ, ªÉÄà 31, 2018

¨sÁUÀ 1

b)

Change of mode of acquisition of land from KIADB to U/s 109 of KLR Act for laying the pipeline to draw water for the

project.

All other terms and conditions indicated in the Government Order dated: 29-02-2016 read at (2) above, remain unaltered.

PR-241

SC-10

By Order and in the name of the Governor of Karnataka,

G . NAGARATHNAMMA

Desk Officer (Technical Cell)

Commerce & Industries Department.

COMMERCE & INDUSTRIES SECRETARIAT

Sub :

Amendment to the earlier approved project proposal of M/s ILC Industries Ltd. – reg.

Read :

1. Proceedings of the 10

th and 13

th State High Level Clearance Committee (SHLCC) meeting held on

28-08-2007 and 13-03-2008 respectively.

2. Government Order No. CI 74 SPI 2008, dated: 29-04-2008.

3. Proceedings of the 24

th State High Level Clearance Committee (SHLCC) meeting held on 24-01-2011.

4. Government Order No. CI 74 SPI 2008, dated: 11-03-2011.

5. Proceedings of the 50th State High Level Clearance Committee (SHLCC) meeting held on 23-02-2018.

Preamble :

The project proposal of M/s. ILC Industries Ltd., was accorded approval in the 10

th & 13

th State High Level Clearance Committee

meeting held on 28-08-2007 and 13-03-2008 respectively to establish “Integrated Steel Plant-0.2 MTPA” with an investment of

`. 717.40 in 102 acre 35 gunta of land U/s 109 of KLR Act at various survey numbers of Kunikere Village, Koppala Taluk & District. The

Government Order was issued vide read at (2) above.

As per decision of 24

th State High Level Clearance Committee meeting held on 24-01-2011 Government has accord approval

given to M/s ILC Industries Ltd. In favour of M/s. ILC Iron & Steel Pvt. Ltd.

As per the Incorporation certificate dated: 17-10-2008, the constitution of the company is changed form Public Limited to Private

Limited and the name has been changed from M/s. ILC Industries Ltd. to M/s. ILC Iron & Steel Pvt. Ltd.

Now, the company vide their letter dated: 07-12-2017 has informed that 102 acres 35 guntas of land approved for the project

U/s 109 of KLR Act are owned by the promoters of the company and they have obtained conversion of land to Industrial purpose from

Deputy Commissioner, Koppal, and also have implemented the project. They have requested for approval for transfer of above

converted lands from the name of promoters to the name of the company along with change of constitution in the company and name of

the company.

The proposal of the company was examined in the 50

th State High Level Clearance Committee (SHLCC) Meeting held on

23-02-2018 and approved.

Government has examined the recommendations made by the 50

th SHLCC in all aspects.

Hence the following Order.

GOVERNMENT ORDER NO. CI 53 SPI 2018, BENGALURU, DATED: 03-03-2018.

The Government is pleased to accord approval to change of constitution of the company from Public Limited to Private Limited

and change of name from M/s. ILC Industries Ltd. To M/s. ILC Iron and Steel Pvt. Ltd.

All other terms and conditions indicated in the Government Order dated: 29-04-2008 read at (2) above, remain unaltered.

PR-242

SC-10

By Order and in the name of the Governor of Karnataka,

G . NAGARATHNAMMA

Desk Officer (Technical Cell)

Commerce & Industries Department.

COMMERCE & INDUSTRIES SECRETARIAT

Sub :

Amendment to the earlier approved project proposal of M/s. Havells India Ltd., - reg.

Read :

1.

Proceedings of the 43

rd State High Level Clearance Committee (SHLCC) meeting held on 01-02-2016.

2.

Government Order No. CI 58 SPI 2016, dated: 01-03-2016.

3.

Government Order No. CI 58 SPI 2016, dated: 31-03-2016.

4.

Proceedings of the 50

th State High Level Clearance Committee (SHLCC) meeting held on

23-02-2018.

¨sÁUÀ 1

PÀ£ÁðlPÀ gÁdå¥ÀvÀæ, UÀÄgÀĪÁgÀ, ªÉÄà 31, 2018

619

Preamble :

The project proposal of M/s. Havells India Ltd., to establish a unit for manufacture of “Cable & Wire, MCB, LED, Electronics,

Solar Lights” in 50 acres of land at Hi-tech Defence & Aerospace Park, Devanahalli, Bengaluru Rural District with an investment of

`. 1059.00 crore generating employment to about 2576 persons was approved in the 43

rd SHLCC meeting held on 01-02-2016.

Subsequently Government vide order read at (2) above has been issued.

In the Government Order read at (3) above Government has accorded approval for the following proposals of the company.

1.

Change of location of the project from Devanahalli to Vasanthanarasapura Industrial Area, Tumakuru.

2.

KIADB to allot 62.09 acres of land in plot No.685 & 686 at Vasanthanarasapura Industrial Area, Tumakuru.

KIADB vide allotment Letter No.KIADB/Allot/AS/21140/2924/2016-17, dated: 30-05-2016, has allotted 60.24 acres of land at

Plot No.685 & 686 in Vasanthanarasapura 3

rd Phase Industrial Area, Tumakuru and subsequently has issued possession Certificate

vide No.IADB/TMK/VNPR-3/AE/PC/879/2016-17, dated: 16-07-2016.

The company vide their letter dated: 13-02-2018 has submitted that due to malki payment issues and additional demand of

Rs.8.09 crore by KIADB towards Infrastructure development, HT overhead line, farmers agitation for want of their unpaid amount, they

could not execute Lease Deed with KIADB and commence the construction activities in time. Now, most of the issues are sorted out and

they are ready to take up project implementation.

In view of the above, the company has requested to grant extension of time till July 2021 to implement the project.

The proposal of the company was examined in the 50

th State High Level Clearance Committee (SHLCC) Meeting held on

23-02-2018 and approved.

Government has examined the recommendations made by the 50

th SHLCC in all aspects.

Hence the following Order.

GOVERNMENT ORDER NO. CI 58 SPI 2016, BENGALURU, DATED: 03-03-2018.

The Government is pleased to grant extension of time by three years to M/s. Havells India Ltd. to implement the project

approved vide Government Order No. CI 58 SPI 2016, dated: 31-03-2016 from the date of issue of this order.

All other terms and conditions indicated in the Government Order dated: 31-03-2016 read at (2) above, remain unaltered.

PR-243

SC-10

By Order and in the name of the Governor of Karnataka,

G . NAGARATHNAMMA

Desk Officer (Technical Cell)

Commerce & Industries Department.

COMMERCE & INDUSTRIES SECRETARIAT

Sub :

Amendment to the earlier approved project proposal of M/s. Shree Cement Ltd., - reg.

Read :

1 Proceedings of the 28

th State High Level Clearance Committee (SHLCC) meeting held on 23-05-2012.

2 Government Order No. CI 190 SPI 2012, dated: 24-05-2012.

3 Proceedings of the 50

th State High Level Clearance Committee (SHLCC) meeting held on 23-02-2018.

Preamble :

The project proposal of M/s. Shree Cement Ltd. to establish “6 MTPA Cement Plant” with an investment of `. 2000.00 crore in

1900 acres of land to be purchased U/s 109 of KLR Act at different Sy. Nos. of Tilgul, Balwad, Kirangi & B.Saradgi Villages, Kalaburagi

Taluk and District was approved in the 28

th meeting of SHLCC held on 23-05-2012. Accordingly Government Order was issued vide

read at (2) above.

Now, the company vide letter dated: 12-02-2018 has requested to mention the plant area as 370.65 acres and mining area

as 1529.35 acres within the total approved land area of 1900 acres and issue amendment to the project approval Government Order

dated: 24-05-2012.

The proposal of the company was examined in the 50

th State High Level Clearance Committee (SHLCC) Meeting held on

23-02-2018 and approved.

Government has examined the recommendations made by the 50

th SHLCC in all aspects.

Hence the following Order.

GOVERNMENT ORDER NO. CI 70 SPI 2018, BENGALURU, DATED: 03-03-2018.

Government is pleased to accord approval for the following:

To mention the land requirement in SHLCC approval Government Order No. CI 190 SPI 2012, dated: 24-05-2012 as: “1900

acres of land (370.65 acres for Plant area and 1529.35 acres for Mining area) to be purchased U/s 109 of KLR Act at different Sy. Nos.

of Tilgul Balwad, Kirangi and B Saradgi Villages, Kalaburagi Taluk and District”.

All other terms and conditions indicated in the Government Order dated: 24-05-2012 read at (2) above, remain unaltered.

PR-244

SC-10

By Order and in the name of the Governor of Karnataka,

G . NAGARATHNAMMA

Desk Officer (Technical Cell)

Commerce & Industries Department.

620

PÀ£ÁðlPÀ gÁdå¥ÀvÀæ, UÀÄgÀĪÁgÀ, ªÉÄà 31, 2018

¨sÁUÀ 1

COMMERCE & INDUSTRIES SECRETARIAT

Sub :

Amendment to the earlier approved project proposal of M/s.Bidadi Vendors Industrial Park Welfare

Association - reg.

Read :

1. Proceedings of the 37

th State High Level Clearance Committee (SHLCC) meeting held on 27-03-2015.

2. Government Order No. CI 118 SPI 2015, dated: 06-05-2015.

3. Proceedings of the 43

rd State High Level Clearance Committee (SHLCC) meeting held on 01-02-2016.

4. Government Order No. CI 118 SPI 2015, dated: 09-03-2016.

5. Proceedings of the 50

th State High Level Clearance Committee (SHLCC) meeting held on 23-02-2018.

Preamble:

The project proposal of M/s. Bidadi Vendors Industrial Park Welfare Association to establish “Vendors Park for Automobile

Components and others” at Sy. Nos.158, 159, 160 of Banandur Village and Sy. Nos.75, 76, 77 of Heggedegere Village, Sy. No. 20, 21

of Ittamadu Village, Sy. Nos. 91, 101, 102, 103, 104, 105 and 109 of Abbanakuppe Village, Bidadi Hobli, Ramanagara Taluk with an

investment of `. 700 crore, generating employment to about 4,900 persons was approved by the 37

th SHLCC meeting held

on 27-03-2015. The Government Order was issued vide read at (2) above.

Subsequently, deletion of Sy. No.160 of Banandur Village and Sy. Nos. 75, 76, 77 of Heggadagere Village from the Sy. Nos.

already approved and inclusion of alternate Sy.No.92,97 to 100, 106 to 108 of Abbanakupee Village and Sy.No.157 of Banandur Village

for the project to purchase balance 50 acres 7 guntas of land U/s 109 of KLR Act in the new Sy.Nos. within the total approved extent of

95 acres of land subject to zoning regulations of Local Planning Authority, was approved in the 43

rd SHLCC meeting held on 01-02-

2016. Accordingly, Government Order was issued vide read at (4) above.

Now, the company vide their letter dated: 04-12-2017 has informed that they have taken the following effective steps to

implement 1

st Phase of the project.

The company has purchased 44 acres of land in Bananduru and Heggadegere Villages and the same have been

converted for industrial purpose and development work is in progress.

Application has been filed with BMICAPA seeking change of ‘land use’ of lands falling within their limits and the said

application, having received the approval of all relevant authorities, is placed before the BMICAPA for consideration.

Change of land use and preliminary approval of layout plan has also been obtained.

KSPCB has issued No Objection Certificate.

BESCOM has issued its No Objection Certificate.

Have constructed roads & drainages and erection of electric poles is in progress.

Further, the company has requested the Committee for approval of the following:

BMRDA to accord plan approval for 2

nd phase of the project in 50 acres of existing adjacent land at Sy. Nos. 90, 91,

92, 97 to 109 of Abbanakuppe Village and Sy.Nos.20 and 21 of Ittamadu Village.

Extension of time by 3 years to implement the project.

The proposal of the company was examined in the 50

th State High level Clearance Committee (SHLCC) Meeting held on

23-02-2018 and approved to grant extension of time by three years to implement the project.

Government has examined the recommendations made by the 50

th SHLCC in all aspects.

Hence the following Order.

GOVERNMENT ORDER NO. CI 118 SPI 2015, BENGALURU, DATED: 03-03-2018.

The Government is pleased to grant extension of time to M/s. Bidadi Vendors Industrial Park Welfare Association to implement

the project approved vide Government Order No. CI 118 SPI 2015, dated: 06-05-2015 for further period of three years from the date of

issue of this order.

All other terms and conditions indicated in the Government Order dated: 06-05-2015 read at (2) above, remain unaltered.

PR-245

SC-10

By Order and in the name of the Governor of Karnataka,

G . NAGARATHNAMMA

Desk Officer (Technical Cell)

Commerce & Industries Department.

ªÀÄÄzÀæPÀgÀÄ ºÁUÀÆ ¥ÀæPÁ±ÀPÀgÀÄ:- ¸ÀAPÀ®£Á¢üPÁjUÀ¼ÀÄ, PÀ£ÁðlPÀ gÁdå¥ÀvÀæ, ¸ÀPÁðj PÉÃAzÀæ ªÀÄÄzÀæuÁ®AiÀÄ, ¨ÉAUÀ¼ÀÆgÀÄ-59.

R.N.I. No. KARBIL/2001/47147 POSTAL REGN. No. RNP/KA/BGS/2202/2017-19

Licensed to post without prepayment WPP No. 297