WATER RESOURCES DEPARTMENT
NOTIFICATION
No. A7-8991/2012.
19th October 2012.
The following are the select list of First Garde D'man/
Overseer under Diploma Quota/Certificate Quota
(Mechanical) prepared by the DPC (Technical Lower) in
the meeting held on 25-9-2012 and approved by the
Government for promotion to the category of Assistant
Engineer (Mechanical) for the year 2012.
I
First Grade D'man/Overseer Mechanical (Diploma
Quota) for the year 2012
Sl. No.
Name
1
Sri K. R. Vijayakumar
2
Sri C. Nanda Kumar
3
Sri M. Alexander
PART III
Irrigation Department
Gaz. 20/2012/DTP (Irrigation).
II
First Grade D'man/Overseer Mechanical
(Certificate Quota) for the year 2012
Sl. No.
Name
1
Sri C. J. Thankappan
2
Sri P. A. Dharmajan
3
Smt. D. Vasantha Kumari Amma
4
Sri T. A. Joseph
P. LATHIKA,
Chief Engineer,
Irrigation & Administration,
Office of the
Thiruvananthapuram
Chief Engineer,
&
Irrigation & Administration,
Convenor, DPC, Technical
Thiruvananthapuram.
Lower (Mechanical).
KERALA GAZETTE
tIcf Kkddv
PUBLISHED BY AUTHORITY
B[nImcnIambn {]kn≤s∏SpØp∂Xv
©
Government of Kerala
tIcf k¿°m¿
2012
No.
\º¿
Vol. I
hmeyw 1
}
}
23rd October 2012
2012 HIvtSm_¿ 23
1st Karthika 1934
1934 Im¿ØnIw 1
THIRUVANANTHAPURAM, TUESDAY
Xncp-h-\-¥-]p-cw, sNm∆
20
Regn. No. KERBIL/2012/45073
dated 5-9-2012 with RNI
Reg. No. cPn. \º¿
KL/TV(N)/12/12-14
23rd OCT. 2012]
IRRIGATION DEPARTMENT
206
.
TENDER NOTICES
(1)
No. W4 (C)-1654/97.
29th September 2012.
The Superintending Engineer, Minor Irrigation
Circle, Thiruvananthapuram on behalf of the Governor of
Kerala invites competitive tenders for the following work
in sealed cover superscribing the name of work from the
Registered Contractors of Irrigation and Public Works
Departments.
The firm period of the tender will be four (4) months
from the date of receipt of tender.
Tender No.—15/SEMI/2012-13.
Name of Work and Related Division with Estimate
PAC—Sutharya Keralam—FD—Construction of a culvert
across Narakatharathodu in Ward No. 1 of Udayanapuram
Panchayath (Kottayam)— 23,50,000.
EMD— 50,000.
Cost of tender documents— 3,600 + VAT@5%.
Class of eligible contractor—B Class and above.
Time of completion of work—6 months.
Tender documents and other particulars can be
obtained from the office of the undersigned on all
working days commencing from 29-10-2012 up to 4 p.m.
on 31-10-2012. A preliminary agreement in the
prescribed form in Stamp Paper worth 100 should also
be executed and submitted along with the tender.
Tenders received without preliminary agreement will be
summarily rejected. According to the provision of Kerala
Construction Workers Welfare Fund Act, 8 (2) 1984, the
Contractor who is undertaking construction of work has
to remit 1% of total cost of construction as contribution
towards the Kerala Construction Workers Welfare Fund.
The EMD should be pledged in favour of the
Superintending Engineer, Minor Irrigation Circle,
Thiruvananthapuram and submitted along with the
tender.
The sealed tenders should reach the office of the
undersigned by post/speed post on or before 4 p. m.
on 3-11-2012. Under any circumstances the tenders
received directly or by courier will not be accepted. The
tender will be opened at 4 p.m. on 3-11-2012 by the
undersigned or an authorized person in the presence of
tenderers who are present at that time. The tenders will
not be received in person direct under any
circumstances. If the tender date is declared to be a
holiday the tenders will be received on the next working
day upto 4 p.m. and will be opened at 4.30 p. m. Earnest
Money will not be accepted in the form of Indira Vikas
Pathra. Labour Contract Societies should produce
certificates from competent authority (from concerned
Joint Registrar) showing their Class of Registration, work
in hand, financial limit of total works, they can take up at
a time and eligibility certificate while purchasing the tender
documents and submit along with the tender documents.
All the conditions prevailing in respect of the tenders in
Kerala PWD and as per the G.. O. (P) No. 84/97/PW&T
applicable to the above work also.
tIcf Kh¿Æ¿°p-th≠n Xncp-h-\-¥-]pcw sNdp-InS
Pe-tk-N\ hn`mKw kq{]-≠nwKv F©n-\o-b¿ Xmsg- ]-d-bp∂
{]h¿Øn-°v Pe-hn-`h hIp-∏ntem s]mXp-a-cm-aØv
hIp-∏ntem cPn-ÿ sNbvXn-´p≈ \n¿±njvS tbmKy-X-bp≈
AwKo-Imc Icm-dp-Im-cn¬\n∂pw a’-c-kz-`m-h-ap≈Z¿Lm-kp-Iƒ
Z¿Lmkv t]cpw \ºcpw {]hr-Øn-bpsS t]cpw Bte-J\w
sNbvXn-´p≈ ap{Z-h® Ih-dp-I-fn¬ X]m¬ apJm-¥ncw
£Wn-®p-sIm-≈p-∂p. Z¿Lm-kns‚ Imem-h[n AXp
kzoI-cn-°p∂ XobXn apX¬ 4 (\m-ev) amkw hscbmbn-cn°pw.
Z¿Lmkv \º¿—15/Fkv. C. Fw.sF./201-2˛13.
{]hrØn-bpsS t]cpw _‘s∏´ Unhnj\pw AS-¶¬
XpIbpw—kpXmcy tIcfw—sh-≈-s∏m°s°Sp-Xn—
D-Z-b\m-]pcw ]©m-b-Ønse \mc-I-Ød tXmSn\p IpdsI
Iep¶v \n¿Ωn-°p∂ ]Wn (tIm-´-bw)— 23,50,000.
\nc-X-{Zhyw— 50,000.
Z¿Lmkv {]am-W-Øns‚ hne— 3,600+hm‰v 5%.
Icm-dp-Im-cpsS hn`mKw—_n ¢mkpw AXn\papI-fnepw.
]Wn ]q¿Øo-I-cn-°m-\p≈ Imem-h[n—6 amkw.
Z¿Lmkv {]am-W-ßfpw a‰v hni-Z-hn-h-c-ßfpw 29˛10˛2012
apX¬ 31˛10˛2012 sshIp-t∂cw 4 aWnhsc F√m {]h¿Øn
Znh-k-ß-fnepw Xmsg H∏ph®n-´p≈ DtZym-K-ÿs‚ Imcym-e-b-
Øn¬\n∂pw e`n-°p-∂-Xm-Wv. Z¿Lm-kp-I-fp-sS- IqsS 100
(\qdv)˛s‚ ap{Z-∏-{X-Øn¬ \n›nX t^md-Øn-ep-≈Xp
{]Imcw Xøm-dm-°nb {]mY-anI Icm¿]{Xw ka¿∏n-t°-≠-
Xm-Wv. {]mY-anI Icm¿]{Xw C√msX ka¿∏n-°p∂
Z¿Lm-kp-Iƒ Hcp Imc-W-h-imepw ]cn-K-Wn-°p-∂-X-√.
1984-˛se tIcf \n¿ΩmW sXmgn-emfn t£a-\n[n
\nb-a-Ønse 8 (2) hIp∏v A\p-k-cn®v {]kvXpX ]Wn-sb-Sp-
°p∂ Icm-dp-Im-c≥ \n¿ΩmW {]hr-Øn-bpsS samØw
sNe-hns‚ Hcp iX-am\w \n¿ΩmW sXmgn-emfn t£a-\n[n
^≠n-te°v \¬Im≥ _m≤yÿ-\m-Wv. \nc-X-{Zhyw
Xncp-h-\-¥-]pcw sNdp-InS Pe-tk-N\ -hn-`mKw kq{]-≠nwKv
F©n-\o-b¿°v am‰n FSp-°-ذcoXn-bn¬ hmtß-≠Xpw
Z¿Lmknt\m-sSm∏w ka¿∏n-t°-≠-Xp-am-Wv.
]qcn∏n® Z¿Lm-kp-Iƒ X]m¬/kv]oUv t]mÃv aptJ\
am{Xw 3˛11˛2012, 4 aWn°v apºmbn Xmsg H∏ph®n-´p≈-
DtZym-K-ÿs‚ Imcym-e-b-Øn¬ FØn-t°-≠Xm-Wv. Z¿Lmkv
\ºcpw {]hr-Øn-bpsS t]cpw tcJ-s∏-Sp-Ønb ap{Z-h®
Ih-dn-em-bn-cn-°-Ww Z¿Lm-kp-Iƒ ka¿∏n-t°-≠-Xv. e`n®
Z¿Lm-kp-Iƒ 3˛11˛2012 sshIp-t∂cw 4 aWn°pXs∂
kq{]-≠nwKv F©-n-\o-b-tdm At±lw A[n-Im-c-s∏-Sp-Øp∂ a‰v
DtZym-K-ÿt\m
At∏mƒ
lmP-cmIp∂
Icm-dp-
Im-cpsS km∂n-≤y-Øn¬ Xpd-°p-∂Xm-Wv. Z¿Lm-kp-Iƒ
bmsXmcp Imc-W-h-imepw t\cn´v kzoI-cn-°p-∂X-√. At∂
-Zn-hkw Ah-[n-bm-bm¬ sXm´-SpØ -Zn-hkw 4 aWn hsc
Z¿Lm-kp-Iƒ kzoI-cn-°p-∂Xpw At∂-Zn-hkw 4 aWn°v
Xpd-°p-∂Xpam-Wv. \ncX{Zhy-ambn CµncmhnImkv]{X
kzoI-cn-°p-∂-X-√. Pe-hn-`h hIp-∏n-sebpw s]mXp-a-cm-aØv
23rd OCT. 2012]
IRRIGATION DEPARTMENT
207
hIp-∏n-sebpw Z¿Lm-kpIsf kw_-‘n-°p∂ as‰√m
hyh-ÿ-Ifpw Cu Z¿Lm-kn\pw _m[-I-am-Wv. te_¿
tIm¨{SmIvSv skmssk‰n-Iƒ, Z¿Lm-kn-t\m-sSm∏w Ah-cpsS
tbmKy-X, ssIh-i-ap≈ ]Wn-Iƒ, Ah¿°v FSp-°m-hp∂
]Wn-I-fpsS kmº-ØnI ]cn[n apX-em-bh Dƒs°m-≈p∂
k¿´n-^n-°-‰p-Ifpw _‘s∏´ tPmbn‚ v cPn-kv{Sm-dn¬\n∂v
e`n-®Xv sS≠¿ hmßp∂ kabw lmPcmt°≠Xpw BbXv
Z¿Lm-kn-t\m-sSm∏w ka¿∏n-t°-≠-Xpam-Wv. tIcf
CdntKj≥ Un∏m¿´psa‚ns‚ sS≠¿ kw_‘n®
\n_‘\Ifpw Pn. H. (]n.) \º¿ 84/97/]n. U_vfyp.
B‚ v ‰n. {]Im-c-ap≈ \n_-‘-\-I-fpw Cu Z¿Lm-kn\pw
_m[-I-am-Wv.
(2)
No. W4 (C)-1654/97.
29th September 2012.
The Superintending Engineer, Minor Irrigation Circle,
Thiruvananthapuram on behalf of the Governor of Kerala
invites competitive tenders for the following works in
sealed cover superscribing the name of work from the
Registered Contractors of Irrigation and Public Works
Departments. The firm period of the tender will be
four (4) months from the date of receipt of tender.
Tender No., Name of work and related Division with
Estimate PAC—15/SEMI/2012-13—Sutharya Keralam—FD—
Construction of a culvert across Narakathara thodu in
Ward No. 1 of Udayanapuaram Panchayath (Kottayam)—
23,50,000.
EMD— 50,000.
Cost of tender documents— 3,600 + VAT @ 5%.
Last date and time of receipt of tender—3-11-2012,
4 p. m.
Class of eligible contractors—‘B’ class and above.
Time of completion—6 months.
Tender documents and other particulars can be
obtained from the office of the undersigned on all working
days commencing from 29-10-2012 up to 4 p.m. on
31-10-2012. A preliminary agreement in the prescribed
form in Stamp Paper worth 100 should also be executed
and submitted along with the tender. Tenders received
without preliminary agreement will be summarily rejected.
According to the provision of Kerala Construction
Workers Welfare Fund Act, 8 (2) 1984, the Contractor
who is undertaking construction of work has to remit 1%
of total cost of construction as contribution towards the
Kerala Construction Workers Welfare Fund. The EMD
should be pledged in favour of the Superintending
Engineer, Minor Irrigation Circle, Thiruvananthapuram and
submitted along with the tender.
The sealed tenders should reach the office of the
undersigned by post/speed post on or before 4 p. m. on
3-11-2012. Under any circumstances the tenders received
directly or by courier will not be accepted. The tender will
be opened at 4 p. m. on 3-11-2012 by the undersigned or
an authorized person in the presence of tenderers who
are present at that time. The tenders will not be received
in person direct under any circumstances. If the tender
date is declared to be a holiday the tenders will be
received on the next working day upto 4 p. m. and will be
opened at 4.30 p. m. Earnest Money will not be accepted
in the form of Indira Vikas Pathra. Labour Contract
Societies should produce certificates from competent
authority (from concerned Joint Registrar) showing
their class of registration, work in hand, financial limit of
total works, they can take up at a time and eligibility
certificate while purchasing the tender documents and
submit along with the tender documents. All the
conditions prevailing in respect of the tenders in Kerala
PWD and as per the G. O. (P) No. 84/97/PW&T applicable
to the above work also.
tIcf Kh¿Æ¿°pth≠n Xncp-h-\-¥-]pcw sNdp-InS
Pe-tk-N\ -hn-`mKw kq{]-≠nwKv F©n-\o-b¿ Xmsg ]-d-bp∂
{]hrØn-°v Pe-hn`h hIp-∏ntem s]mXp-a-cm-aØv
hIp-∏ntem cPn--ÿ sNbvXn-´p≈ \n¿±njvS tbmKy-Xbp≈
AwKoIrX Icm-dp-Im-cn¬\n∂pw a’-ckz`m-h-ap≈
Z¿LmkpIƒ, Z¿Lmkv \ºcpw {]h¿ØnbpsS t]cpw
BteJ\w sNbvXn´p≈ ap{Zh® IhdpIfn¬ X]m¬
apJm¥ncw £Wn-®p-sIm-≈p-∂p. Z¿Lm-kns‚ Imem-h[n
AXv kzoI-cn-°p∂ XobXn apX¬ 4 (\m-ev) amkw hsc
Bbn-cn°pw.
Z¿Lmkv \ºcpw {]hrØn-bpsS t]cpw _‘s∏´
Unhnj\pw AS-¶¬ XpIbpw—15/Fkv.C.Fw.sF./
2012˛13 —kpXm-cy-tI-cfw˛sh-≈-s∏m-°-s°-Sp-Xn-˛-D-Z-b-\m-]pcw
]©m-b-Ønse \mc-I-Ød tXmSn\p IpdpsI Iep¶v \n¿-Ωn-
°p∂ ]Wn (tIm´bw)— 23,50,000.
\nc-X-{Zhyw— 50,000.
Z¿Lmkv {]am-W-Øns‚ hne — 3,600 + hm‰v (5%).
Z¿Lmkv kzoI-cn-°p∂ Ah-km\ Xob-Xnbpw
ka-bhpw—3˛11-˛2012, 4 aWn.
Icm-dp-I-mcpsS hn`mKw—‘_n’ ¢mkpw AXn-\p-ap-I-fnepw.
]Wn ]q¿Øo-I-cn-°m-\p≈ Imem-h[n—6 amkw.
Z¿Lmkv {]am-W-ßfpw a‰v hni-Z-hn-h-c-ßfpw 29˛10˛2012
apX¬ 31-˛10˛2012 sshIp-t∂cw 4 aWnhscbpw
F√m {]h¿Øn Znh-k-ß-fnepw Xmsg H∏ph®n-´p≈
DtZym-K-ÿs‚ Imcym-e-b-Øn¬ \n∂pw e`n-°p-∂-Xm-Wv.
Z¿Lm-kp-I-fp-sS-IqsS 100 (\qdv)˛s‚ ap{Z-∏-{X-Øn¬ \n›nX
t^md-Øn-ep-≈Xp {]Imcw Xøm-dm-°nb {]mY-anI
Icm¿]{Xw ka¿∏n-t°-≠-Xm-Wv. {]mY-anI Icm¿]{Xw
C√msX ka¿∏n-°p∂ Z¿Lm-kp-Iƒ Hcp Imc-W-h-imepw
]cn-K-Wn-°p-∂-X-√. 1984-˛se tIcf \n¿ΩmW sXmgn-emfn
t£a-\n[n \nb-a-Ønse 8 (2) hIp∏v A\p-k-cn®v {]kvXpX
]Wn-sb-Sp-°p∂ Icm-dp-Im-c≥ \n¿ΩmW {]hr-Øn-bpsS
samØw sNe-hns‚ Hcp iX-am\w \n¿ΩmW sXmgn-emfn
23rd OCT. 2012]
IRRIGATION DEPARTMENT
208
t£a-\n[n ^≠n-te°v \¬Im≥ _m≤yÿ-\m-Wv.
\nc-X-{Zhyw Xncp-h-\-¥-]pcw sNdp-InS Pe-tk-N\ -hn-`mKw
kq{]-≠nwKv F©n-\o-b¿°v am‰n FSp-°-ذcoXn-bn¬
hmtß-≠Xpw Z¿Lmknt\m-sSm∏w ka¿∏n-t°-≠-Xp-am-Wv.
]qcn∏n® Z¿Lm-kp-Iƒ X]m¬/kv]oUv t]mÃv
aptJ\ am{Xw 3˛11˛2012, 4 aWn°v apºmbn Xmsg H∏ph®n-
´p≈- DtZym-K-ÿs‚ Imcym-e-b-Øn¬ FØn-t°-≠Xm-Wv.
Z¿Lmkv \ºcpw {]hr-Øn-bpsS t]cpw tcJ-s∏-Sp-Ønb
ap{Z-h® Ih-dn-em-bn-cn-°-Ww Z¿Lm-kp-Iƒ ka¿∏n-t°-≠-Xv.
e`n® Z¿Lm-kp-Iƒ 3˛11˛2012 sshIp-t∂cw 4 aWn°pXs∂
kq{]-≠nwKv F©-n-\o-b-tdm At±lw A[n-Im-c-s∏-Sp-Øp∂
a‰v DtZym-Kÿt\m At∏mƒ lmP--cmIp∂ Icm-dp-Im-cpsS
km∂n-≤y-Øn¬ Xpd-°p-∂Xm-Wv. Z¿Lm-kp-Iƒ bmsXmcp
Imc-W-h-imepw t\cn´v kzoI-cn-°p-∂X-√. At∂-Zn-hkw
Ah-[n-bm-bm¬ sXm´-SpØ Zn-hkw 4 aWn hsc Z¿Lm-kp-Iƒ
kzoI-cn-°p-∂Xpw At∂-Zn-hkw 4 aWn°v Xpd-°p-∂Xpam-Wv.
\ncX{Zhy-ambn CµncmhnImkv]{X kzoI-cn-°p-∂-X-√.
Pe-hn-`h hIp-∏n-sebpw s]mXp-a-cm-aØv hIp-∏n-sebpw
Z¿Lm-kpIsf kw_-‘n-°p∂ as‰√m hyh-ÿ-Ifpw Cu
Z¿Lm-kn\pw _m[-I-am-Wv. te_¿ tIm¨{SmIvSv
skmssk‰n-Iƒ, Z¿Lm-kn-t\m-sSm∏w Ah-cpsS tbmKy-X,
ssIh-i-ap≈ ]Wn-Iƒ, Ah¿°v FSp-°m-hp∂ ]Wn-I-fpsS
kmº-ØnI]cn[n apX-em-bh Dƒs°m-≈p∂ k¿´n-^n-
°-‰p-Ifpw _‘s∏´ tPmbn‚ v cPn-kv{Sm-dn¬\n∂v e`n-®Xv
sS≠¿ hmßp∂ kabw lmPcmt°≠Xpw BbXv
Z¿Lm-kn-t\m-sSm∏w ka¿∏n-t°≠-Xpam-Wv. tIcf
CdntKj≥ Un∏m¿´psa‚ ns‚ sS≠¿ kw_‘n®
\n_‘\Ifpw Pn. H. (]n) \º¿ 84/97/]n. U_vfyp.
B‚ v ‰n. {]Im-c-ap≈ \n_-‘-\-I-sf√mw Cu
Z¿Lm-kn\pw _m[-I-am-Wv.
Office of the Superintending Engineer,
Minor Irrigation Circle,
5th Floor, Jalavijnana Bhavan,
Ambalamukku, Kowdiar P. O.,
(Sd.)
Thiruvananthapuram-03.
Superintending Engineer.
Z¿Lmkv ]ckyw
\º¿ Un6˛671/2008-.
2012 sk]v‰w-_¿ 28.
tIcf Kh¿Æ¿°pth≠n Xncp-h-\-¥-]pcw h≥-InS
Pe-tk-N\ hn`mKw, FIvkn-Iyq-´ohv F©n-\ob¿ Xmsg-
]-d-bp∂ {]hr-ØnIƒ°v A\p-tbm-Py-cmb AwKo-IrX
Icmdp-Im-cn¬\n∂pw a¬k-c-kz-`m-h-ap≈ Z¿Lm-kp-Iƒ
{]h¿Øn-bpsS t]cpw Z¿Lmkv \ºcpw Bte-J\w
sNbvX ap{Z-h® IhdpIfn¬ cPn-ÿ sNbvX X]m-en¬
£Wn-®p-sIm-≈p-∂p. sImdn-b¿ k¿∆okv aptJ\
e`n-°p∂Z¿Lm-kp-Iƒ kzoI-cn-°p-∂-X-√. {]kvXpX Znhkw
Ah-[n- BIp-∂-]£w ASpØ {]h¿Øn Znhkw CtX
ka-b-ß-fn¬
Z¿Lm-kp-Iƒ
kzoI-cn-°p-∂Xpw
Xpd-°p-∂-Xp-am-Wv.
{Ia
Z¿Lmkv \ºcpw
\nc-X
\º¿
{]hrØn-bpsS t]cpw
{Zhyw
AS-¶¬ XpIbpw
(1)
(2)
(3)
1
6/CC/2012˛13—s\øm¿ Pe-tk-N\ ]≤-Xn-˛
CS-Xp-Ic sabn≥ I\m-en¬ sN. 1100 ao.,
5100 ao., 9750 ao., 9800 -ao., 13250 ao. F∂o
`mK-ß-fnse dmºp-I-fp-sSbpw ]Sn-s°-´p-I-fpsSbpw
A‰-Ip-‰-]-Wn-Iƒ— 4 e£w
10,000
2
7/CC/2012˛13—Sn
CS-Xp-Ic sabn≥
I\m-en¬ sN. 11000. ao.\pw 11300 ao.-˛\pw,
CS-bv°p≈ `mKsØ kwc-£W ]Wn-Ifpw
-_≠v _e-s∏-Sp-Øp∂ ]-Wn-Ifpw—
3.10 e£w
7,750
3
8/CC/2012˛13—Sn
Np≈n-bq¿ {_m©v
Nm\en¬ tdmUv ]mew 1/1˛\v Xmgv`mKsØ
kwc-£W ]Wn-Ifpw tNm¿® AS°p∂
]Wn-Ifpw— 3.05 e£w
7,650
4
9/CC/2012˛13—Sn
sIm√-bn¬ {_m©v
Nm\-en¬ 0 ao‰¿ apX¬ 3800 ao. hsc
ASn™v IqSn-bXpw CSn™v hoW-Xp-amb
aÆv \o°w sNbvXv I\m¬ hrØn-bm-°p∂
]Wn-Iƒ— 5 e£w
12,500
5
10/CC/2012˛13—Sn
sN¶¬ ssa\¿
{_m©v Nm\-en¬ 0 ao‰¿ apX¬ Ah-km\w
hsc-bp≈ `mKsØ Sn
Sn
Sn—
3.05 e£w
7,650
6
11/CC/2012˛13—Sn
sN¶¬ ssa\¿
{_m©v Nm\-en¬ sN. 1600 ao‰dn\pw 1800
ao‰dn\pw CS-bv°p≈ `mKsØ ]m¿iz-
kw-c-£W ]Wn-Ifpw A‰-Ip‰ ]Wn-Ifpw—
5 e£w
12,500
7
12/CC/2012˛13—Sn
sN¶¬ taP¿
{_m©v Nm\-ens‚ 0 ao‰¿ apX¬ Ah-km\
`mKw-h-sc-bp≈ `mKsØ ASn™v IqSn-bXpw
CSn™v hoW-Xp-amb aÆv \o°w sNbvXv
I\m¬ hrØn-bm-°p∂ ]Wn-Iƒ—
3.80 e£w
9,500
8
13/CC/2012˛13— Sn
sN¶¬ taP¿
{_m©v Nm\-ens‚ sN. 4750 ao‰-dn\pw
4850 ao‰-dn\pw CSbv°p≈ `mKsØ
]m¿izkwc-£W ]Wn-Iƒ — 4 e£w
10,000
9
14/CC/2012˛13—Sn
DZn-b≥Ip-f-ßsc
k_v Nm\-ens‚ 50 ao‰-dn\pw 250 ao‰-dn\pw
CSbv°v hi-ß-fpsS kwc-£W ]Wn-Ifpw
I´v B‚ v Ih¿ \n¿Ωm-Whpw— 5 e£w
12,500
10
15/CC/2012˛13—Sn
sIm√wtImSv {_m©v
Nm\-ens‚ sN. 490 ao‰-dn\pw 600 ao‰-dn\pw
CSbv°p≈ `mKsØ kwc-£W ]Wn-Ifpw
_e-s∏-Sp-Øp∂ ]Wn-Ifpw— 3.05 e£w
7,650
23rd OCT. 2012]
IRRIGATION DEPARTMENT
209
11
16/CC/2012˛13—s\øm¿ Pe-tk-N\ ]≤-Xn-˛
he-Xp-Ic sabn≥ I\m-en¬ sN. 3535,
6000, 6200, 7000, 7200, 10330, 15895, 16500,
16900 F∂o `mKsØ dmºp-I-fp-sSbpw
]Sn-s°-´p-I-fpsSbpw A‰-Ip-‰]-Wn-Iƒ—
4 e£w
10,000
12
17/CC/2012˛13—Sn
he-Xp-Ic sabn≥
I\m-en¬ tdmUv ]mew 2/4˛\v Xmgv `mKsØ
tNm¿® ASbv-°p∂ ]Wn-Ifpw kwc-£W
]Wn-Ifpw — 4 e£w
10,000
13
18/CC/2012˛13—Sn
he-Xp-Ic I\m-en¬
sN. 21605 ao‰-dn¬ kq∏¿ ]mt Pv 3/22˛\v
apIƒ `mKsØ kwc-£W ]Wn-Ifpw _≠v
_e-s∏-Sp-Øp∂ ]Wn-Ifpw— 5 e£w
12,500
14
19/CC/2012˛13—Sn
he-Xp-Ic sabn≥
I\m-en¬ sN. 23050 ao‰-dn\pw 23150 ao‰-dn\pw
CSbv°v tNm¿®-bp≈ CSXp _≠ns‚
_e-s∏-Sp-Øp∂ ]Wn-Ifpw — 5 e£w
12,500
15
20/CC/2012˛13—Sn
hS-tImSv {_m©v
Nm\-ens‚ sN. 6278 ao‰-dn-ep≈ kq∏¿
]mt Pv 2/7˛s‚ Xmgv `mKsØ tNm¿®
AS-bv°p∂ ]Wn-Iƒ— 3.05 e£w
7,650
16
21/CC/2012˛13—Sn
s]cp-º-gp-Xq¿
h\-Zp¿§m tZho t£{X-Øn\v kao]w
s]cp-º-gp-Xq¿ k_v Nm\-en¬ \ne-hn-ep≈
I´v B‚ v Ih-dns‚ \ofw Iq´p∂ ]Wn-Ifpw
_≠ns‚ kwc-£W ]Wn-Ifpw—
4.5 e£w
11,250
17
22/CC/2012˛13—Sn
hngn™w {_m©v
Nm\-ens‚ sN. 12350 ao‰-dn\pw 12425 ao‰-dn\pw
CS-bv°p≈ `mKsØ kwc-£W ]Wn-Iƒ—
5 e£w
12,500
18
23/CC/2012˛13—Sn
hngn™w taP¿
{_m©v Nm\-en¬ sN. 16700 ao‰¿ apX¬
20500 ao‰¿ hsc-bp≈ `mKsØ sNfnbpw
CSn™v hoW aÆpw \o°n Nm\¬
hrØn-bm-°p∂ ]Wn-Iƒ — 5 e£w
12,500
19
24/CC/2012˛13—Sn
hngn™w {_m©v
Nm\-ens‚ sN. 16850 ao‰-dn\pw 17050 ao‰-dn\pw
CS-bv°p≈ `mKØv then \n¿Ωn-°p∂
]Wn-Iƒ — 3.1 e£w
7750
20
2 5 / C C / 2 0 1 2 ˛ 1 3 — S n
s h ≈m - b W n
t\m¿Øv {_m©v Nm\-en¬ sN. 2750 ao‰-dn\pw
2950 ao‰-dn\pw CSbv°v tNm¿® am‰p∂
]Wn-Ifpw kwc-£W ]Wn-Ifpw —
5 e£w
12,500
21
2 6 / C C / 2 0 1 2 ˛ 1 3 — S n
s h ≈m - b W n
shÃv {_m©v Nm\-en¬ sN. 3000 ao‰-dn\pw
9000 ao‰-dn\pw CS-bv°v sNfnbpw CSn™phoW
aÆpw \o°n Nm\¬ hrØn-bm-°p∂
]Wn-Iƒ — 5 e£w
12,500
22
27/CC/2012˛13—Sn
]q∆m¿ CuÃv
{_m©v Nm\-en¬ sN. 1622 ao‰-dn\pw
1700 ao‰-dn\pw CS-bv°p≈ kwc-£W
]Wn-Ifpw Hme-Øm∂n {_m©n-ep≈
tISmb j´¿ am‰n ]pXn-bXv hbv°p∂
]Wn-Ifpw — 3.1 e£w
7,750
23
28/CC/2012˛13—Sn
]q∆m¿ CuÃv
{_m©v Nm\-ens‚ sN. 5493 ˛\pw
5641 ˛\pw CS-bv°p≈ kwc-£W
]Wn-Iƒ — 5 e£w
12,500
24
29/CC/2012˛13—Sn
]q∆m¿ CuÃv
{_m©v Nm\-ens‚ sN. 5782 ˛\pw
5922 ˛\pw CS-bv°p≈ kwc-£W
]Wn-Iƒ — 5 e£w
12,500
25
30/CC/2012˛13—Sn
]q∆m¿ shÃv
{_m©v Nm\-en¬ sN. 10827 ao‰-¿ apX¬
11080 ao. hsc-bp≈ CS-bv°p≈ sNfn \o°w
sNøepw a‰v A‰-Ip‰∏Wn-Ifpw— 5 e£w
12,500
26
31/CC/2012˛13—Sn
]q∆m¿ shÃv
{_m©v Nm\-en¬ sN. 1250 ao‰-dn\pw
2000 ao‰dn\pw CS-bv°p≈ sNfnbpw
CSn™phoW aÆv \o°w sNbvXv I\m¬
hrØn-bm-°p∂ ]Wn-Ifpw sN. 1518
Fkv. ]n2/2˛\pw 1650˛\pw CS-bv°p≈
kwc-£W ]Wn-Ifpw A‰-Ip-‰-∏-Wn-Ifpw—
3.1 e£w
7,750
27
32/CC/2012˛13—Sn
]q∆m¿ shÃv
{_m©v Nm\-en¬ sN. 16070 ao‰dn\pw
16198 ao‰-dn\pw CS-bv°p≈ kwc-£W
]Wn-Ifpw A‰-Ip-‰-∏-Wn-Ifpw — 5 e£w
12,500
28
33/CC/2012˛13—Sn
]q∆m¿ shÃv
{_m©v Nm\-en¬ sN. 15345 ao‰-dn\pw
15500 ao‰-dn\pw CS-bv°v kwc-£W ]Wn-Ifpw
…qbn-kns‚ A‰-Ip-‰-∏-Wn-Ifpw— 3.1 e£w
7,750
29
34/CC/2012˛13—Sn
sNm∆c {_m©v
Nm\-ens‚ sN. 3900˛\pw 4000˛\pw CSbv°v
hi-ß-fpsS kwc-£W ]Wn-Ifpw a‰v
kwc-£W ]-Wn-Ifpw — 5 e£w
12,500
30
35/CC/2012˛13—Sn
sNm∆c {_m©v
Nm\-ens‚ sN. 6100˛\pw 6400˛\pw CSbv°v
tNm¿® am‰p∂ ]-Wn-Ifpw — 5 e£w
12,500
31
36/CC/2012˛13—Sn
sNm∆c {_m©v
Nm\-ens‚ sN. 9000˛\pw 10500˛\pw CSbv°v
Hcp \S-∏m-e-Øns‚ \n¿Ωm-Whpw a‰v
kwc-£W ]-Wn-Ifpw — 5 e£w
12,500
Z¿Lmkv {]am-W-Øns‚ hne—{Ia\-º¿ 1, 7, 8, 11, 12
Chbv°v 800 + hm‰v, {Ia\-º¿ 2, 3, 5, 10, 15, 19, 22, 26,
28 Chbv°v 700 + hm‰v, {Ia\-º¿ 16-˛\v 900 + hm‰v,
a‰p-≈-hbv°v 1000 + hm‰v.
(1)
(2)
(3)
(1)
(2)
(3)
Gaz. 20/2012/DTP (Irrigation).
23rd OCT. 2012]
IRRIGATION DEPARTMENT
210
Z¿Lmkv {]am-W-߃ e`n°p∂ Ah-km\
XobXnbpw ka-bhpw—29-˛10˛2012 D®bv°v 1 aWn-.
Z¿Lmkp-Iƒ cPntÃUv X]m-en¬ kzoI-cn-°p∂
Ahkm\ Xob-Xnbpw ka-bhpw—3˛11˛2012 sshIp-t∂cw
4 aWn.
Z¿Lmkp-Iƒ Xpd-°p∂ Xob-Xnbpw ka-bhpw—
3˛11˛2012 sshIp-t∂cw 4.30 aWn-.
Icm-dp-Im-cpsS tbmKyX—‘Un’bpw AXn\p apI-fnepw.
]Wn-Xo¿t°≠ Imem-h-[n—4 amkw.
tIcf k¿°m-cns‚ 100˛-s‚ ap{Z-]-{X-Øn¬
Pe-tk-N\ hIp-∏n\v _m[-I-amb {]mY-anI Icm-dpw
FIvkn-Iyq-´ohv F©n-\obsd A[n-Im-c-s∏-SpØnb
Bh-iy-amb Ãmºv ]Xn®v H∏n´ \nc-X-{Z-hyhpw D≈-S°w
sNbvXn-´n-√mØ Z¿Lm-kp-Iƒ \ncp]m-[nIw \nc-kn-°p-
∂-Xm-Wv. 1990-˛se tIcf \n¿Ωm-W-sØm-gn-emfn t£a-\n[n
\nb-a-Ønse F√m hyh-ÿ-Ifpw Pe-tkN-\ hIp-∏nse
Z¿Lm-kp-Isf kw_-‘n-°p∂ F√m -hy-h-ÿ-Ifpw
CXn\pw _m[-I-am-Wv.
sXmgn-emfn kl-I-cW kwL-߃ ka¿∏n-°p∂
Z¿Lm-kpItfmsSm∏w Pn. H. (FwFkv.) 135/97
tIm˛-Hm-∏-td-‰ohv XobXn 13-˛11-˛1997˛¬ \njvI¿jn-°p∂
k¿´n-^n-°‰pw ssIh-i-ap≈ {]hrØn-bpsS hnh-c-ßfpw
D≈-S°w sNtø-≠-Xm-Wv.
s]mXp-a-cm-aØv/Pe-tk-N\
hIp∏pI-fnse
Z¿Lm-kp-Isf kw_-‘n-°p∂ F√m hyh-ÿ-Ifpw
CXn\pw _m[-I-am-Wv.
FIvknIyq´ohv F©n-\o-bdpsS
Imcymebw,
h≥InS PetkN\ hn`mKw,
(H-∏v)
Xncp-h-\-¥-]p-cw.
FIvkn-Iyq-´ohv F©n-\o-b¿.
PRE-QUALIFICATION RE-TENDER NOTICE
No. D4/2433/DIR/INDT/2010.
1st October 2012.
The Director, Inland Navigation Directorate, Kallada
House, Asramam P. O., Kollam for and on behalf of the
Governor of Kerala invites bid for pre-qualification and
competitive tender for award of work in separate sealed
covers for the following works from financially sound and
well experienced Registered “A” Class Contractors/Firms
of Irrigation/ PWD who have satisfactorily completed at
least one similar work having Estimate PAC/Revised
Estimate PAC worth 50% of Estimate PAC of the
captioned work.
PQ Tender No. and Name of Work with Estimate
PAC—1/PQ/DIR/INDT/2011-12—THFC—Development and
revival of Historic Water way from Anjengo Kayal to
Nadayara Kayal (Ch. 42.46 km to 55.17 km) including
revival of two tunnels at Varkala—Reach IV from
Nadayara to Nadayara Kayal ch. 52200 to 55170 m
(Kollam Division)— 460 Lakh.
EMD— 50,000.
Date and time upto which pre-qualification and tender
forms will be issued—5-11-2012, 1 p.m.
Last date and time for the receipt of pre-qualification
and tender forms—14-11-2012, 4 p.m.
Date and time of opening of pre-qualification
documents—14-11-2012, 4.30 p.m.
Time of completion—18 months.
Details of Principal items of works
Sl.
Description
Quantity
No.
of work
1
Earth work for deepening canal
71360 m3
and de-silting
2
RCC 1:1.5:3
2521 m3
3
CC 1:3:6 using 20 mm broken stone
2356 m3
4
CC 1:3:6 using graded metal
156 m3
5
CC 1:4:8
185 m3
6
Reinforcement
3105 Qtl.
Details of essential plants and equipments required for
execution of work detailed above
Sl.
Item
Quantity
No.
1
Barge/Changadam
2 Nos.
2
Winch, wire rope, plank etc.
4 Sets
3
Motor boat
4 Nos.
4
Truck/Tipper lorry
5
,,
5
Crane/Lifting equipment
2
,,
6
Concrete mixer and Vibrator
4 sets
CONDITIONS
1.
Registered ‘A’ Class Contractors/Firms in Irrigation
Department/Kerala Public Works Department, who
have experience in carrying out large works and
who consider themselves capable of carrying out
these types of works may obtain PQ documents and
tender documents from the office of the
undersigned on any working day up to the date
and time noted, on payment of 25,000 + VAT in
cash directly. Those who require further copies may
deposit 12,500 + VAT for each additional copy.
2.
Prospective bidders should have completed at least
one similar work with Estimate PAC/Revised
Estimate PAC without considering tender variation
worth 50% of the Estimate PAC as specified
against the work within the last five years. A
certificate to this effect from the agreement
executing authority of the completed work shall
23rd OCT. 2012]
IRRIGATION DEPARTMENT
211
invariably be submitted along with the application
for PQ documents and tender documents, failing
which; PQ documents will not be issued to him/
them (applicant). (Applications without this
certificate will not be considered). The contractors/
firms should attach an affidavit along with the PQ
documents stating whether or not any works
carried out by him/them were terminated due to his
or their fault so far. Documents showing the
ownership of the essential plants or machineries
required for the work should be submitted along
with the PQ documents.
3.
The PQ documents and tender documents will not
be issued after the date and time specified under
any circumstances. The duly filled up PQ
documents (3 copies) along with EMD and
preliminary agreement in one sealed cover and
tender for work in another sealed cover, writing
clearly over the cover specifying whether it
contains PQ document/tender document with the
name of bidder and name of work and then
enclosing these two covers in a single cover duly
superscribing the name of work and name of
contractor and send the same by Registered/
Speed Post, so as to reach the office of the
undersigned before 4 p. m. on the date specified.
The PQ documents and tender documents received
after the time notified above will not be considered
under any circumstance. The tender received after
the stipulated date and time due to postal delays
or tender through courier service or directly will
not be accepted. The undersigned reserves the
right to deny Pre-qualification to any of the
applicant and to reject the tender submitted by
any of the applicant without assigning any reason
thereto. If the last date of the receipt of tender
happens to be a holiday, tenders will be received
up to the stipulated time on the next working day.
Preliminary agreement on stamp paper worth
100 duly filled up and signed (to be enclosed
with PQ document) and sufficient EMD duly
pledged in favour of the Director, Inland Navigation
Directorate, Kollam should be enclosed in a
separate sealed cover superscribing “Earnest
Money” and attach separately to the cover
containing PQ documents for the works. Tenders
received without the above mentioned documents
shall summarily be rejected.
4.
PQ document alone will be opened at 4.30 p. m. on
the dates specified. After evaluation of the PQ
document in the office of the undersigned, the
same will be submitted to the Chief Engineer,
Irrigation and Administration, Thiruvananthapuram
for approval and final selection by the
Prequalification Committee. Only those tenders,
submitted by the contractors/firms who are
pre-qualified by the Committee shall be opened and
scrutinized later on. Tenders of contractor or firms
who have not been pre-qualified will be summarily
rejected without opening the tenders and will be
returned to the tenderer on proper receipt. Those
who intend to form consortium or joint venture
agreement should obtain prior approval of the
Director before obtaining the tender documents.
The date and time for opening of tenders of work
will be intimated well in advance to the concerned
contractor/firm who are pre-qualified.
5.
Besides security deposit, 10% of the PAC as Bank
Guarantee should be submitted by the selected
bidder at the time of executing agreement. All the
conditions contained in GO(P) No. 84/97, dated
19-8-1997, GO(P) No. 13/98/PWD, dated 21-2-1998,
GO(Ms.) No. 43/99/IRD, dated 9-6-1999, GO(Ms.)
No. 2/2005/PWD, dated 7-1-2005 and amendments
thereto and other rules prevailing with regard to
tender for works in Irrigation Department / PWD
will be applicable to this tender also.
6.
For getting re-tender documents, original
certificates should be produced.
tIcf Kh¿Æ¿°p-th≠n Ub-d-IvS¿, Dƒ\mS≥
PeKXmKX Ub-d-IvS-td-‰v, B{im-aw, sIm√w Xmsg ]d-bp∂
{]hr-Øn-°v tIcf s]mXp-a-cm-aØv hIp-∏ntem Pe-tkN\
hIp-∏ntem cPn-ÿ sNbvX-n´p≈ ‘F’ ¢mkv tbmKy-X-bp-≈-
hcpw G‰hpw Npcp-ßn-bXv Xmsg hnh-cn-®n-cn-°p∂ {]hr-Øn-
bpsS 50 (A≥]-Xv) iX-am-\-sa-¶nepw FÃn-ta‰v/]pXp-°nb
FÃn-ta‰v XpI-bv°p≈ kam-\-amb Hcp {]hr-Øn-sb-¶nepw
Xr]vXn-I-c-ambn ]q¿Øn-bm-°n-bn-´p-≈-h-cp-amb AwKo-IrX
Icm-dp-Im-cn¬ \n∂pw a¬k-c-kz-`m-h-ap≈ ap≥tbmKyXm
\n¿ÆbØn\pw {]hr-Øn-°p-ap≈ ]p\¿Z¿Lm-kp-Iƒ
£Wn-®p-sIm-≈p-∂p.
Z¿Lmkv \ºcpw {]hrØn-bpsS t]cpw AS-¶¬
XpIbpw—1/]n. Iyp/Un. sF. B¿./sF. F≥. Un. ‰n./
2011-˛12—‰n. F®v. F^v. kn.—Dƒ\m-S≥ Pe-]m-X-bpsS
hnI-k\w—h¿°-e-bnse c≠v Xpc-¶-ß-fpsS ]p\-cp-≤m-cWw
Dƒs∏sS A©psXßp Imb¬ apX¬ \S-bd Imb¬ hsc
sNbn-t\Pv 42.46 In.-ao. apX¬ 55.17 In. ao. hsc-bp≈
]Wn-Iƒ—`mKw IV—\S-bd apX¬ \S-bd Imb¬ hsc
sNbnt\Pv 52.20- In.-ao. apX¬ 55.17 In.-ao. hsc— 460 e£w.
{]hrØn-°p≈ \nc-X-{Zhyw— 50,000.
ap≥ tbmKyXm \n¿Æb Z¿Lmkv t^md-߃
hnXcWw sNøp∂ Ah-km\ XobXnbpw kabhpw—
5-˛11˛2012 D®bv°v 1 aWn.
ap≥ tbmKyXm \n¿Æb Z¿Lmkv kzoIcn°p∂
Ahkm\ XobXnbpw kabhpw—14˛11˛2012 sshIp-t∂cw
4 aWn.
ap≥ tbmKyXm \n¿Æb Z¿Lmkv Xpd°p∂
XobXnbpw kabhpw—14˛11˛2012 sshIp-t∂cw 4.30 aWn.
{]hrØn Xo¿t°≠ Imem-h[n—18 amkw.
23rd OCT. 2012]
IRRIGATION DEPARTMENT
212
Cu {]hrØn°p≈ {][m\ tPmen-Iƒ
{Ia
]Wn-bpsS hnh-cWw
Afhv
\º¿
1
tXmSp Ipgn-°p-∂-Xn\pw F°¬
71360 Iyq.-ao.
\o°p-∂-Xn-\p-ap≈ a¨ the
2
{]_-enX kna‚ v tIm¨{Io‰v 1:1½:3
2521 ,,
3
kna‚ v tIm¨{Io‰v 1:3:6
2356 ,,
4
t{KUUv kna‚ v tIm¨{Io‰v 1:3:6
156 ,,
5
kna‚ v tIm¨{Io‰v 1:4:8
185 ,,
6
Iºn
3105 Izn‚¬
Ahiyw th≠p∂ b{¥-km-a-{Kn-Iƒ
{Ia
C\w
Afhv
\º¿
1
_m¿Pv/NßmSw
2 FÆw
2
hn©v, Ccpºp Ib¿ apX-em-bh
4 FÆw
3
b{¥w LSn-∏n® t_m´v
4 sk‰v
4
{S°v/Sn∏¿ temdn
5 FÆw
5
s{Ibn≥/Db¿Øm-\p≈ D]-I-cWw
2 FÆw
6
tIm¨{Io‰v anIvkdpw ssht{_-‰dpw
4 FÆw
\n_-‘-\-Iƒ
1.
ap≥ tbmKyXm \n¿Æb {]am-W-ßfpw Z¿Lmkv
{]am-W-ßfpw Xmsg H∏n-´n-cn-°p∂ B^o-k-dpsS
Hm^o-kn¬ \n∂pw ta¬ tcJ-s∏-Sp-Øn-bn-cn-°p∂
Znhkw cmhnse 11 aWn apX¬ sshIp-t∂cw
4 aWn-hsc s]mXp-a-cm-aØv hIp-∏ntem Pe-hn-`h
hIp-∏ntem ap≥Ime {]hr-Øn-]-cn-N-bhpw Cu
{]hrØn sNøp-hm≥ tijn-bp-s≠∂v kzbw
t_m≤y-ap-≈-hcpw Imcy-{]m-]vXn-bp-ap≈ ‘F’
¢mkv Icm-dp-Im¿°v/ÿm]-\-߃°v Z¿Lmkv
{]amW hne-bmbn 25,000- \nb-am-\p-krX \nIp-Xn-
Ifpw AS®v hmßm-hp-∂-Xm-Wv. A[nI tIm∏n-Iƒ
Bh-iy-ap≈ Icm-dp-Im¿ 12,500 \nb-am-\p-kr-X-amb
\nIp-Xn-Ifpw AS-bvt°-≠-Xm-Wv.
2.
Hmtcm {]hr-Øn-bpsS AS-¶¬ XpI/]pXp-°nb
AS-¶¬ (sS≥U¿ hyXymkw IqSmsX) XpI-bpsS
50 iX-am-\-sa-¶nepw Xpey-amb XpI-bv°p≈
a¨the/F°¬ \o°¬ Dƒs∏-sS-bp≈ kam-\
-kz-`m-h-ap≈ ]Wn-Iƒ sNbvXv ap≥]-cn-N-b-ap≈
Icm-dp-Imsc ]cn-K-Wn-°p-∂-Xm-Wv. {]kvXpX ]Wn
]q¿Øo-I-cn-®-Xmbn B ]Wn-bpsS F{Kn-sa‚ v h®
DtZym-K-ÿ≥ km£y-s∏-Sp-Øp∂ tcJ At]-£-
tbm-sSm∏w ka¿∏n-®m¬ am{Xta ap≥tbm-Ky-Xbv°pw
Z¿-Lm-kn-\p-ap≈ {]am-W-߃ \¬Ip-I-bp-≈p.
A√m-sX-bp≈ At]-£-Iƒ ]cn-K-Wn-°p-∂-X-√.
ap≥tbm-KyX \n¿Æ-bn-°p-∂-Xn-\p≈ At]-£-Iƒ
ka¿∏n-°p-∂-Xn-t\m-sSm∏w Xm≥ Gs‰-Sp-Øn-´p≈
]Wn-Iƒ H∂pw Xs∂ Xs‚ Ip‰-waqew d±m-°-
s∏-´n-´n√ F∂v {]kvXm-hn-®n-´p≈ kXy-hm-Mvaqew
Icm-dp-Im¿/ÿm]-\-߃ ka¿∏n-t°-≠-Xm-Wv.
{]h¿Øn-°m-h-iy-amb F√m b{¥-km-a-{Kn-I-fp-sSbpw
D]-I-c-W-ß-fp-sSbpw DS-a-ÿX sXfn-bn-°p-∂-
Xn-\p≈ hnh-c-߃ ap≥tbm-KyX \n¿Æ-bn-°p-∂-
Xn-\p≈ tcJ-Iƒ ka¿∏n-°p-∂-Xn-t\m-sSm∏w
lmP-cm-t°-≠-Xm-Wv. BbXv sXfn-bn-°p-∂ -k¿´n-^n-
°-‰p-Iƒ At]-£-tbm-sbm∏w ka¿∏n-°m-Ø-]£w
At]-£-Iƒ kzoI-cn-°p-∂-X√.
3.
\n›nX Xob-Xn°pw ka-b-Øn\pw tijw bmsXmcp
Imc-W-h-imepw ap≥tbm-KyXm \n¿Æb {]am-W-
ßtfm Z¿Lmkv {]am-W-ßtfm \¬Ip-∂-X-√.
]q¿Æ-ambn ]qcn-∏n® tbmKy-Xm -\n¿Æb {]am-W-
ßfpw (3 FÆw) \nc-X-{Z-hyhpw {]mcw` DS-º-Snbpw
Hcp ap{Z h® Ih-dnepw Z¿Lmkv {]am-W-߃
as‰mcp ap{Z-h® Ih-dnepw Ih-dn\p apI-fn¬ ap≥
tbmKyXm {]amWw/Z¿Lmkv {]amWw F∂v
Bte-J\w sNbvXv Icm-dp-Im-cs‚/ÿm]-\-Øns‚
t]cpw {]hr-Øn-bpsS t]cpw Bte-J\w sNbvXv
aq∂m-a-sXmcp Ih-dn¬ a‰v c≠v Ih-dp-Ifpw
\nt£-]n®v \n›nX XobXn sshIp-t∂cw
4 aWn°v ap≥]mbn kv]oUv t]mÃv/cPn-kvt‰¿Uv
X]m-en¬ Xmsg H∏n-´n-cn-°p∂ DtZym-K-ÿs‚
Imcym-e-b-Øn¬ e`n-®n-cn-°-Ww. \n›nX Xob-Xn°pw
ka-b-Øn\pw tijw e`n-°p∂ Z¿Lm-kp-Iƒ,
X]m¬ hIp-∏nse Xma-k-Øm¬ sshIn e`n-°p∂
Z¿Lm-kp-Iƒ, sImdn-b¿ k¿∆o-kn¬ e`n-°p∂
Z¿Lm-kp-Iƒ, t\cn´v e`n-°p∂ Z¿Lm-kp-Iƒ
F∂nh kzoI-cn-°p-∂-X-√. ap≥tbm-KyXm \n¿Æb
{]am-W-ßfpw Z¿Lmkv {]am-W-ßfpw ImcWw
t_m[n-∏n-°msX \nc-kn-°p-∂-Xn\v Xmsg H∏n-´n-cn-
°p∂ DtZym-K-ÿ\v A[n-Imcw D≠m-bn-cn-°pw.
{]am-W-߃ kzoI-cn-°p∂ \n›nX XobXn Ah[n
Znh-k-am-bm¬ sXm´-SpØ {]hrØn Znhkw \n›nX
kabw hsc {]am-W-߃ kzoI-cn-°p-∂-Xm-Wv.
tbm-KyXm \n¿Æb {]am-W-Ønt\m-sSm∏w 100
hne-bp≈ ap{Z-]-{X-Øn¬ ]q¿Æ-ambpw ]qcn-∏n®v
H∏n´ {]mY-anI DS-º-Snbpw Dƒ\m-S≥ Pe-K-Xm-KX
Ub-d-IvS¿, sIm√w F∂ t]cn¬ am‰n FSp-°-ذ
coXn-bn¬ aXn-bmb \nc-X-{Z-hyhpw AS°w sNømØ
tcJ-Iƒ \ncp-]m-[nIw \nc-kn-°p-∂-Xm-Wv.
4.
ap≥tbm-KyXm \n¿Æb {]am-W-߃ am{Xw \n›nX
XobXn sshIp-t∂cw 4.30 aWn°v Xpd-°p-∂-
Xm-bn-cn-°pw. {]kvXpX {]am-W-߃ {]mY-anI
hne-bn-cp-Ø-en-\p-tijw Pe-tkN\ hIp∏v No^v
F©n-\o-b-dpsS AwKo-Im-c-Øn\pw ap≥tbm-KyXm
\n¿Æb IΩ-‰n-bpsS Ah-km\ Xocp-am-\-Øn-\pambn
ka¿∏n-°p-∂-Xm-Wv. ap≥tbm-KyXm \n¿Æbw e`n®
Icm-dp-Im-cpsS Z¿Lm-kp-Iƒ am{Xw Xpd∂v kq£va
]cn-tim-[\ \S-Øp-∂Xpw tbmKyX e`n-°mØ
Icm-dp-Im-cpsS/ÿm]-\-Øns‚ Z¿Lm-kp-Iƒ
\nc-kn-°p-∂Xpw BbXv tcJm-aqew Bh-iy-s∏-´m¬
XncnsI \¬Ip-∂-Xpam-Wv. tPmbn‚ v sh©z¿
F{Kn-sa‚ v {]Imcw ]Wn-Iƒ FSp-°p-hm≥
Xmev]-cy-ap≈ Icm-dp-Im¿ ap≥tbm-KyXm \n¿Æb
{]am-W-ßfpw Z¿Lmkv {]am-W-ßfpw ssI∏-‰p-
∂-Xn\v apºmbn Ub-d-IvS-dpsS ap≥Iq¿ A\p-aXn
hmßn-bn-cn-t°-≠-Xm-Wv.
23rd OCT. 2012]
IRRIGATION DEPARTMENT
213
5.
ap≥ tbmKyX \n¿Æ-bn-°-s∏´ Icm-dp-Im-cpsS
Z¿Lmkv {]am-W-߃ Xpd-°p∂ ka-bhpw
Xob-Xnbpw ap≥Iq´n Adnbn°p∂-Xm-Wv. Xnc-s™-
Sp-°-s∏´ Icm-dp-Im-c≥ kpc-£nX \nt£-]-Øn
-\p]-cn-bmbn AS-¶¬ XpI-bpsS 10 iX-am\w _m¶v
Kymc≠n ka¿∏n-t°-≠-Xm-Wv. ap≥ tbmKyXm
\n¿Æ-b-sØ-°p-dn®pw Z¿Lm-kp-Isf kw_-‘n®pw
Pe-tkN\ hIp-∏nepw s]mXp-a-cm-aØv hIp-∏nepw
\ne-hn-ep≈ F√m hyh-ÿ-Ifpw Cu Z¿Lm-kn\pw
_m[-I-am-Wv.
6.
Z¿Lmkv {]amWw e`n-°p-∂Xn-te°v k¿´n-^n-
°-‰p-Iƒ/ A ¬ {]am-W-߃ lmP-cm-t°-≠-Xm-Wv.
Inland Navigation Directorate,
Kallada House, Asramam P. O.,
(Sd.)
Kollam.
Director.
]p\¿ -Z¿Lmkv ]ckyw
\º¿ ‰n.-F. 4217/91.
2012 HIvtSm-_¿ 10.
tIcf Kh¿Æ¿°pth≠n FIvknIyq-´ohv F©n-\o-b¿
(sN-dp-InS Pe-tk-N-\w), sNß-∂q¿ Xmsg- ]-d-bp∂
{]h¿Øn-Iƒ°pth≠n
\n›nX
tbmKy-X-bp≈
IcmdpImcn¬ \n∂pw a’c kz`m-h-ap≈ Z¿Lm-kpIƒ
{]h¿Øn-bpsS t]cv Bte-J\w sNbvXn-´p≈ ap{Z-h®
{]tXyIw Ih-dp-I-fn¬ £Wn-®p-sIm-≈p-∂p. Xmsg
ImWn-®n-´p≈ Xob-Xn-bnepw ka-bØpw FIvkn-Iyq-´ohv
F©n-\o-btdm At±lw A[n-Im-c-s∏-Sp-Øp∂ DtZym-K-ÿtcm
lmP-cp≈ Icm-dp-Im-cpsS km∂n-≤y-Øn¬ ]cn-tim-[n-
°p-∂-Xm-Wv.
Z¿Lm-kns‚ Imem-h[n AXv kzoI-cn-°p∂ XobXn
apX¬ 4 (\m-ev) amkw hsc Bbn-cn-°pw.
{Ia
Z¿Lmkv \ºcpw
\nc-X-{Zhyw
\º¿
{]hrØn-bpsS t]cpw
AS-¶¬ XpIbpw
t{]mPIvSv sabn‚-\≥kv
1
9/CC/2011-˛12—Imbw-Ipfw ap\n-kn-∏m-en-
‰n-bn¬ 4˛mw hm¿Unep≈ tImt´Øv
tXmSns‚ kwc-£W ]WnIƒ—
12.25 e£w
30,650
2
38/CC/2011-˛12—amth-en-°c ap\n-kn-∏m-
en-‰n-bn¬ ]pXn-b-Im-hn-ep≈ sk‚ vta-cokv
]≈n°v hS-°p-h-i-Øp≈ Xg-°c
tXmSns‚ hi-ß-fpsS kwc-£Ww—
7.50 e£w
18,750
Z¿Lmkv {]am-W-Øns‚ hne—{Ia-\-º¿ 1˛\v
1,900+hm‰v, {Ia-\-º¿ 2˛\v 1,500+hm‰v.
Icm-dp-Im-cpsS hn`mKw—-kn ¢m pw D]-cn-bpw.
{]hr-Øn- ]q¿Øn-bm-t°≠ Imem-h[n— 6 amkw.
{]hr-Øn-bp-ambn _‘-s∏´ Unhn-j≥— sNß-∂q¿.
Z¿Lmkv {]am-W-ßfpw a‰p hni-Z-hn-h-c-ßfpw
6˛11-˛2012 sshIp-t∂cw 3 aWn-hsc Xmsg H∏p-sh-®n-´p≈
DtZymK-ÿs‚ Imcym-e-b-Øn¬ \n∂pw e`n-°p-∂-Xm-Wv.
Z¿Lm-kp-I-fpsS IqsS 100 (\q-dv) cq]-bpsS ap{Z-∏-{X-Øn¬
\n›nX t^md-Øn-ep-≈-Xp-{]-Imcw Xøm-dm-°nb {]mY-anI
Icm¿ ]{Xw ka¿∏n-t°-≠-Xm-Wv. {]mY-anI Icm¿ ]{Xw
C√msX ka¿∏n-°p∂ Z¿Lm-kp-Iƒ Hcp Imc-W-h-imepw
]cn-K-Wn-°p-∂-X-√. 1984-˛se tIcf \n¿Ωm-W-sØm-gn-emfn
t£a-\n[n \nb-a-Ønse 8(2) hIp∏v A\p-k-cn®v {]kvXpX
]Wn-sb-Sp-°p∂ Icm-dp-Im-c≥ \n¿ΩmW {]hr-Øn-bpsS
samØw sNe-hns‚ Hcp iX-am\w \n¿Ωm-W-sØm-gn-emfn
t£a-\n[n ^≠n-te°v \¬Im≥ _m≤y-ÿ-\m-Wv.
]qcn-∏n® Z¿Lm-kp-Iƒ X]m¬ kv]oUv t]mÃv/
cPn-tÿUv t]mÃv aptJ\ am{Xw 9˛11-˛2012 sshIp-t∂cw
3 aWn°v apºmbn Xmsg H∏p-sh-®n-´p≈ DtZym-K-ÿs‚
Imcym-e-b-Øn¬ FØn-t°-≠-Xm-Wv. Z¿Lmkv \ºcpw
{]hrØnbpsS t]cpw tcJ-s∏-Sp-Ønb ap{Z-sh® Ih-dn-em-bn-
cn-°Ww Z¿Lm-kp-Iƒ ka¿∏n-t°-≠-Xv. e`n®
Z¿Lm-kp-Iƒ 9˛11-˛2012 sshIp-t∂cw 3.30 aWn°v Xs∂
FIvkn-Iyq-´ohv F©n-\o-btdm At±lw A[n-Im-c-s∏-Sp-Øp∂
a‰v DtZym-K-ÿt\m At∏mƒ lmP-cm-Ip∂ Icm-dp-Im-cpsS
km∂n-≤y-Øn¬ Xpd-°p-∂-Xm-Wv. Z¿Lm-kp-Iƒ bmsXmcp
Imc-W-h-imepw t\cn´v kzoI-cn-°p-∂-X-√. At∂ Znhkw
Ah-[n-bm-bm¬ sXm´-SpØ Znhkw 3 aWn-hsc
Z¿Lm-kp-Iƒ kzoI-cn-°p-∂Xpw At∂-Zn-hkw 3.30 aWn°v
Xpd-°p-∂-Xp-am-Wv. \nc-X-{Z-hy-ambn Cµncm hnIm-kv]{X
kzoI-cn-°p-∂-X-√.
s]mXp-a-cm-aØv hIp-∏n-tebpw Pe-hn-`h hIp-∏n-tebpw
Z¿Lmkp-Isf kw_-‘n-°p∂ a‰v F√m hyh-ÿ-Ifpw
Cu Z¿Lm-kn\pw _m[-I-am-Wv. te_¿ tIm¨{SmIvSv
skmssk-‰n-Iƒ Z¿Lm-kn-s\m∏w Ah-cpsS tbmKyX,
ssIh-i-ap≈ ]Wn-Iƒ, Ah¿°v FSp-°m-hp∂ ]Wn-I-fpsS
kmº-ØnI
]cn[n
apX-em-bh
Dƒs°m-≈p∂
k¿´n-^n-°-‰p-Ifpw, _‘-s∏´ tPmbn‚ v cPn-kv{Sm-dn¬ \n∂v
e`n-®Xv Z¿Lm-kn-t\m-sSm∏w ka¿∏n-t°-≠-Xm-Wv. Pn.-H.(-]n)
\º¿ 84/97 ]n.Uªyp B‚ v ‰n. {]Im-c-ap≈
\n_-‘-\-I-sf√mw Cu Z¿Lm-kn\pw _m[-I-am-Wv.
FIvknIyq´ohv F©n\obdpsS
Imcym-e-bw,
(H∏v)
sNdp-InS Pe-tk-N\ hn`mKw,
FIvknIyq´ohv
sNß-∂q¿.
F©n\ob¿.
]p\¿ Z¿Lmkv ]ckyw
\º¿ Un._n. 150/2009.
2012 HI-tSm-_¿ 3.
tIcf Kh¿Æ¿°pth≠n Beph s]-cn-bm¿hmen
Cdn-tK-j≥ t{]mPIv‰v k_v Unhn-j≥ \º¿˛4, Bep-h-,
Akn-Â v FIvkn-Iyq-´ohv F©n-\o-b¿ Xmsg ]d-bp∂
{]hrØn-°pth≠n \n›nX tbmKy-X-bp≈ AwKo-IrX
Icm-dp-Im-¿, \ne-hnep≈ DØ-c-hp-Iƒ°v hnt[-b-ambn
tbmKy-X-bp≈ AwKo-IrX sXmgn-emfn kl-I-cW
Gaz. 20/2012/DTP (Irrigation).
23rd OCT. 2012]
IRRIGATION DEPARTMENT
214
kwL-߃ F∂nhcn¬ \n∂pw {]hrØn-bpsS t]cp-hn-hcw
tcJ-s∏-SpØn ap{Zh®n´p≈ Ih-dp-I-fn¬ a’-c-kz-`m-h-ap≈
Z¿Lm-kp-Iƒ £Wn-®p-sIm-≈p-∂p. sImdn-b¿hgn e`n-°p-∂
-Z¿Lm-kp-Iƒ ]cn-KWn-°p-∂-X-√. X]m¬ hIp-∏p-aqew
D≠m-Im-hp∂ Ime-Xm-a-k-Øn\v Cu Imcym-ebw DØ-c
-hm-Zn-Ifmbn-cn-°p-∂-X-√. GsX-¶nepw Imc-W-h-im¬ \n›nX
Znhkw Ah[n Bbm¬ AXn-\-SpØ Znhkw Ah-km\
Xob-Xn-bmbn ]cn-K-Wn-°p-∂-Xm-Wv. Z¿Lm-kp-Iƒ AtX
Znhkw sshIp-t∂cw 3.30 aWn°v Akn-Â v FIvkn-Iyq-´ohv
F©n-\o-btdm At±lw A[n-Im-c-s∏-Sp-Ønbn-cn-°p∂
DtZym-K-ÿ-t\m A-t∏mƒ lmP-cp≈ Icm-dp-Im-cpsS
km∂n-≤y-Øn¬ Xp-d-°p-∂-Xm-Wv.
Z¿Lmkv \ºcpw {]hr-Øn-bpsS t]cpw
AS-¶¬
XpIbpw—5/FCC4/2012˛13—]n.-hn.-sF.-]n.--—]d-hq¿
{_m©v I\m-en¬ sXmgn-em-fn-Isf \ntbm-Kn®v hnhn[
`mK-ß-f-nep≈ s\‰n-e-Sn™pIqSp∂ amen\yw am‰n
kwkv°-cn-°p-∂-Xn-\p≈ tPmen-Iƒ— 3,00,000.
\nc-X-{Zhyw— 7,500.
Z¿Lmkv {]amW-Øns‚ hne— 600 + hm‰v.
Z¿Lmkv {]am-W-ß-fpsS hnev]\—29˛10˛2012,
1 aWnhsc.
Z¿Lm-kp-Iƒ kzoI-cn-°p∂ Ah-km\ XobXnbpw
ka-bhpw—5˛11˛2012, 3 aWn.
Z¿LmkpIƒ Xpd°p∂ Xob-Xnbpw kabhpw—
5˛11˛2012, 3.30 aWn.
IcmdpImcpsS tbmKyX— ‘Un’ ¢m pw AXn\p
apIfnepw.
{]h¿Øn sNbvXp Xo¿t°≠ Imemh[n—9 amkw.
tIcf k¿°m-cns‚ 100˛s‚ ap{Z-]-{XØn¬
Pe-tk-N\ hIp∏n\v _m[-I-amb {]mYanI Icmdpw
Akn v FIvkn-Iyq-´ohv F©n-\o-bsd A[n-Im-c-s∏-SpØn
Bh-iy-am-b -Ãmºv ]Xn®v H∏n´ \nc-X-{Zhyhpw D≈-S°w
sNøm-Ø- Z¿Lm-kp-Iƒ \ncp-]m-[nIw \nc-kn-°p-∂-Xm-Wv.
1990-˛se tIcf sI´n-S- \n¿Ωm-W -sXm-gn-emfn t£a-\n[n
\nb-a-Ønse F√m hyh-ÿ-Ifpw Pe-tk-N\ hIp-∏nse
Z¿LmkpIsf kw_-‘n°p∂ \ne-hn-ep≈ F√m
hyhÿ-Ifpw CXn\pw _m[-I-am-Wv.
sXmgn-emfn kl-I-cW kwL-߃ ka¿∏n-°p∂
Z¿Lm-kpItfm-sSm∏w Pn. H. (FwFkv.)135/97 tIm˛-Hm-∏-td-‰ohv,
XobXn 13-˛11-˛1997-˛¬ \njvI¿jn-°p∂ k¿´n-^n-°-‰pw
ssIh-i-ap≈ {]hrØn-IfpsS hn-h-c-ßfpw D≈-S°w
sNtø-≠-Xm-Wv.
Akn v FIvknIyq´ohv
F©n-\o-b-dpsS Imcym-ebw,
s]cn-bm¿hmen Cdn-tK-j≥ t{]mP-IvSv
(H-∏v)
k_v Un-hn-j≥ \º¿-˛4,
Akn v FIvknIyq´ohv
Bep-h.
F©n-\ob¿.
Z¿Lmkv ]ckyw
\º¿ 9/CC/2012-˛13.
2012 HIvtSm-_¿ 15.
tIcf Kh¿Æ¿°pth≠n Xr»q¿ Cdn-tK-j≥ Unhn-j≥
FIvkn-Iyq-´ohv F©-n\o-b¿ Xmsg- ]dbp∂ {]hrØn-Iƒ°v
tIcf Pe-tkN\/s]mXp-a-cm-aØv hIp-∏n¬ cPn-kvt{S-j-\p≈
A¿l-cmb Icm-dp-Imcn¬ \n∂pw ]Wn-bpsS t]sc-gpXn
ap{Z-h-® {]tXyIw Ih-dp-I-fn¬ a’-cm-Sn-ÿm-\-Øn¬
Z¿Lm-kp-Iƒ £Wn-®psIm≈p∂-p. Sn Z¿Lm-kp-Iƒ Xmsg
]d-bp∂ Znhkw D®-I-gn™v 3 aWn°v FIvkn-Iyq-´ohv
F©n-\o-btdm At±lw A[n-Im-c-s∏-Sp-Øp∂ at‰sX-¶n-epw
DtZym-K-ÿt\m At∂Znhkw k∂n-ln-X-cm-bn-cn-°p∂
Icm-dp-Im-cpsS km∂n-≤y-Øn¬ Xpd-°p-∂-XmWv. No^v
F©n-\o-b¿, t{]mP-IvSv- I, Xncp-h-\-¥-]pcw, 18-˛6-˛2004-˛se
k¿°p-e¿ \º¿ 3759/04/kn.-sF.-B¿. A\p-k-cn®v
C\n apX¬ C≥Uy≥ X]m¬ hIp∏v cPn-tÿUv/kv]oUv
t]mÃv aptJ\ e`n-°p∂ Z¿Lm-kp-Iƒ am{Xta kzoI-cn-°p-
I-bp-≈p. Hmtcm ]Wn-bp-tSbpw Z¿Lm-kp-Iƒ {]tXyIw
{]tXyIw Ih-dp-I-fn¬ C¥y≥ X]m¬ hIp∏v cPn-tÿUv/
kv]oUv t]mÃv aptJ\ ka¿∏n-t°-≠-Xm-Wv. Z¿LmkpIƒ
Xpd-°p∂ Znhkw GsX-¶nepw Imc-W-h-im¬ Ah[n
Bbm¬ ASpØ {]h¿Øn Znhkw Ah-km\ Xob-Xn-bmbn
IW-°m-t°-≠-Xm-Wv. X]m-en¬ hcm-hp∂ Ime-Xm-a-k-Øn\v
Icm-dp-Im-c≥ DØ-c-hm-Zn-bmbn-cn-°pw.
{Ia
Z¿Lmkv \ºcpw
\ncX{Zhyw
\º¿
{]hrØn-bpsS t]cpw
AS-¶¬ XpIbpw
1
38/2012˛13—Fw B‚ v B¿—hmk-p]pcw
Nnd-bpsS 1˛12-˛2012 apX¬ 30-˛6-˛2013
hscbp≈ \n¿Ωm-Whpw kwc-£W
]Wn-Ifpw— 9,40,000
23,500
2
39/2012˛13— Sn tXm´-papJw Nnd-bpsS
1˛12-˛2012 apX¬ 30-˛6-˛2013 hscbp≈
Sn— 8,00,000
20,000
3
40/2012˛13— Sn Imcp-Ipfw Nnd-bpsS
1˛12-˛2012 apX¬ 30-˛6-˛2013 hscbp≈
Sn— 5,75,000
14,400
4
41/2012˛13— Sn I∂m‰p-]mSw Nnd-bpsS
1˛12-˛2012 apX¬ 30-˛6-˛2013 hscbp≈
Sn— 4,35,000
10,900
5
42/2012˛13— Sn Im\tØmSv Nnd-bpsS
1˛12-˛2012 apX¬ 30-˛6-˛2013 hscbp≈
Sn— 6,65,000
16,700
6
37/2012˛13—Sn CSn-b-©nd dKp-te-‰-dns‚
2012˛13 h¿jsØ 30-˛6-˛2013 hscbp≈
Xm¬°m-enI _≠v Sn— 11,05,000
27,700
Z¿Lm-kv {]am-WØns‚ hne—{Ia-\-º¿ 1˛\pw 2˛\pw
1,500 + aq.h.-\n., {Ia-\-º¿ 3˛\v 1,200 + aq.h.-\n., {Ia-\-º¿
4˛\v 900 + aq.h.-\n., {Ia-\-º¿ 5˛\v 1,400 + aq.h.-\n.,
{Ia-\-º¿ 6˛\v 1,700+ aq.h.-\n.
Z¿Lmkv {]am-W-߃ hn¬°p∂ XobXnbpw
ka-bhpw—5˛11˛2012, 1 aWn-hsc.
]qcn-∏n® Z¿Lmkv {]am-W-߃ kzoIcn-°p∂
Ahkm\ XobXnbpw ka-bhpw—8˛11˛2012, 2.30 aWn.
23rd OCT. 2012]
IRRIGATION DEPARTMENT
215
Z¿Lmkv Xpd°p∂ XobXnbpw ka-bhpw—8˛11˛2012,
3 aWn.
Icm-dp-Im-cpsS ¢mkv—{Ia-\-º¿ 3˛\pw 4˛\pw ‘Un’ bpw
AXn\papI-fnepw, a‰p-≈-hbv°v ‘kn’ bpw AXn\p
apI-fnepw.
{]hrØn Xo¿t°≠ Imem-h[n—30-˛6-˛2013.
s]m-Xp-a-cm-aØv hIp-∏nse F, _n F∂o ¢mkv
cPnkvt{S-j-\p≈ A¿l-cmb Icm-dpIm¿°v am{Xta Z¿Lmkv
e`y-am-Ip-I-bp-≈q.
Z¿-L-mkv kw_-‘-n®v IqSp-X¬ hnh-c-߃ Xmsg
H∏p-h-®n-cn-°p∂ DtZym-K-ÿs‚ Imcym-e-b-Øn¬ \n∂pw
{]hrØn Znh-k-ß-fn¬ Adn-bm-hp-∂-Xm-Wv. Z¿Lmkv
{]am-W-߃ \n›nX hne scm°w ]W-amtbm
aWn-tbm¿U-dmtbm AS®v At]-£n-°p∂ \n›n-X- hn-`mKw
Icm-dp-Im¿°v Xmsg H∏p-h-®n-cn-°p∂DtZym-K-ÿs‚
Imcym-e-b-Øn¬\n∂pw Ah-km\ hn¬∏\ Znhkw D®bv°v
1 aWnhsc e`n-°p-∂-Xm-Wv. Z¿Lmkv {]am-W-߃
ssIam-dm≥ ]mSp-≈-X-√. tIcf PetkN\/s]mXp-a-cm-aØv
hIp-∏n¬
Z¿Lmkv
kw_-‘n®v
\ne-hn-ep≈
F√m\n_-‘\-Ifpw CXn\pw _m[-I-am-bn-cn-°pw.
Z¿LmkpI-tfm-sSm∏w 100 hne-bp≈ ap{Z°S-em- n¬
Xøm-dm-°nb \n›nX amXr-I-bn-ep≈ {]mY-anI DS-ºSn
AS°w sNbvXn-cn-t°-≠-Xm-Wv. {]mY-anI DS-º-Sn-bpsS
amXrI Hm^okv t\m´okv t_m¿Un¬ {]Z¿in-∏n-®n-´p-≠v.
]q¿Æ-ambpw ]qcn-∏n® {]mY-anI DS-ºSn AS°w sNbvXn-´n-
√m-ØXpw Bh-iy-amb \nc-X-{Zhyw sI´n-h-bv°m-Ø-Xp-amb
Z¿Lm-kp-Iƒ \nc-kn-°p-∂-Xm-Wv. \nc-X{Zhy-ambn FSp-°p∂
\mj-W¬ tk-hnwKvkv k¿´n-^n-°‰v/Inkm≥ hnIm-kv]{X
F∂nh FIvkn-Iyq-´ohv F©n-\o-b-dpsS t]cn¬ ]W-b-s∏-Sp-
Øn-bn-cn-°-Ww (C-µncm hnIm-kv ]-{X-߃ \nc-X-{Z-hy-ambn
kzoI-cn-°p-∂-X-√). sXmgn-emfn kl-I-cW kwL-߃
ka¿∏n-°p∂ Z¿Lm-kn-s\m∏w Ah-cpsS ssIh-i-ap≈
F√m tPmen-I-fp-sSbpw hni-Z-hn-h-c-߃ AS-ßnb enÃv
kl-I-c-W-kwLw Akn-Â v cPn-kv{Sm-dpsS k¿´n-^n-°-‰n¬
D≠m-bn-cn-t°-≠-Xm-Wv. tIcf \n¿ΩmW sXmgn-emfn
t£a-\n[n \nb-a-Øns‚ 8/3 hIp∏v Cu Z¿Lm-kn\pw
_m[-I-am-bn-cn-°pw.
FIvkn-Iyq-´ohv F©n-\o-b-dpsS
Imcym-e-bw,
Cdn-tK-j≥ Unhn-j≥,
(H∏v)
Xr»q¿.
FIvkn-Iyq-´ohv F©n-\o-b¿.
]p\¿ Z¿Lmkv ]ckyw
\º¿ Un1/645/2010˛11.
2012 HIvtSm-_¿ 9.
tIcf Kh¿Æ¿°pth≠n ]o®n slUv h¿Ivkv k_v
Unhn-j≥ Akn-Â v FIvkn-Iyq-´ohv F©-n\o-b¿ Xmsg
]dbp∂ {]h¿Øn-Iƒ°v tIcf Pe-tkN\/s]mXp-a-cm-aØv
hIp-∏n¬ cPn-kvt{S-j-\p≈ A¿l-cmb IcmdpImcn¬\n∂pw
]Wn-bpsS t]sc-gpXn ap{Z-h-® {]tXyIw Ih-dp-I-fn¬
a’-cm-Sn-ÿm-\-Øn¬
Z¿Lm-kp-Iƒ
£Wn-®p
sIm≈p∂-p. Sn Z¿Lm-kp-Iƒ Xmsg ]d-bp∂ Znhkw
Akn-Â v FIvkn-Iyq-´ohv F©n-\o-btdm At±lw
A[n-Im-c-s∏-Sp-Øp∂ at‰sX-¶n-epw DtZym-K-ÿt\m
At∂Znhkw k∂n-ln-X-cm-bn-cn-°p∂ Icm-dp-Im-cpsS
km∂n-≤y-Øn¬ Xpd-°p-∂-XmWv. No^v F©n-\o-b¿,
t{]mP-IvSv- II, Xncp-h-\-¥-]pcw, 18-˛6-˛2004-˛se k¿°p-e¿ \º¿
3759/04/D5/(3)/CIR A\p-k-cn®v C\n apX¬ C≥Uy≥
X]m¬ hIp∏v cPn-kvt{S-Uv/kv]oUv t]mÃv aptJ\
e`n-°p∂ Z¿Lm-kp-Iƒ am{Xta kzoI-cn-°p-I-bp-≈p. Hmtcm
]Wn-bp-sSbpw Z¿Lm-kp-Iƒ {]tXyIw {]tXyIw
Ih-dp-I-fn¬ C¥y≥ X]m¬ hIp∏v cPn-tÿUv/kv]oUv
t]mÃv aptJ\ ]o®n slUv h¿Ivkv k_v Unhn-j-\n¬
ka¿∏n-t°-≠-Xm-Wv. Z¿LmkpIƒ Xpd-°p∂ Znhkw
GsX-¶nepw Imc-W-h-im¬ Ah[n Bbm¬ ASpØ
{]h¿Øn Znhkw Ah-km\ Xob-Xn-bmbn IW-°m-t°-
≠-Xm-Wv. X]m-en¬hcm-hp∂ Ime-Xm-a-k-Øn\v Icm-dp-Im-c≥
DØ-c-hm-Zn-bmbn-cn-°pw.
{Ia
Z¿Lmkv \ºcpw
\ncX
\º¿
{]hr-Øn-bpsS t]cpw
{Zhyw
AS-¶¬ XpIbpw
1
4/F.- C.- C/2011-˛12—he-Xp-Ic sabn≥
I\m-ens‚ sNbn-t\Pv 8/0 apX¬ 37/300
In. ao‰¿ hscbpw H.-_n.-kn.-˛-bpsS sNbn-t\Pv
0/0 apX¬ 8/0 hscbpw, s\´n-t»-cn,
sImgp-°p-≈n, sh≈m-\n-°-c, apSn-t°m-Sv,
]´n-°m-Sv, hg-°pw-]m-d, sX°pw-]mSw F∂o
{_m©v I\m-ep-Ifpw—th\¬°me Pe-
hn-X-c-W-Øn-\p-th≠ sXmgn-em-fn-Isf
\nb-an-°¬— 1,50,000
3,750
2
5/F.-C.-C/2011-˛12—CS-Xp-Ic sabn≥I\m-ens‚
sNbn-t\Pv 8/500 apX¬ 44/900 In. ao‰¿
hscbp≈ I\m-en¬ th\¬°me Pe-
hn-X-c-W-Øn-\p-th≠ sXmgn-em-fn-Isf
\nb-an-°¬— 1,00,000
2,500
3
8/F.-C.-C/2011-˛12—F B‚ v B¿—aWen
]pg-bnse ]pØq¿Nnd sI´epw A\p-_‘
A‰-Ip-‰∏-Wn-Ifpw— 2,85,000
7,150
Z¿Lmkv {]am-W-Øns‚ hne—{Ia-\-º¿ 1˛\pw 2˛\pw
400 + aqey-h¿[nX \nIpXn, {Ia-\-º¿ 3˛\v 600 + aqey-
h¿[nX \nIpXn.
Z¿Lmkv {]am-W-ßfpsS hn¬∏\ Xoø-Xnbpw
ka-bhpw—5˛11-˛2012, 1 aWn hsc.
]qcn-∏n® Z¿Lmkv {]am-W-߃ kzoIcn-°p∂
Ah-km\ Xob-Xnbpw ka-bhpw—14-˛11˛2012, 2 aWn hsc.
Z¿Lmkv Xpd-°p∂ Xob-Xnbpw ka-bhpw—14˛11˛2012,
2.30 aWn.
{]h¿Øn- Xo¿t°≠ Imem-h[n—{Ia-\-º¿ 1˛\pw
2˛\pw 4 amkw, {Ia-\-º¿ 3˛\v 7 am-kw.
Icm-dp-Im-cs‚ ¢mkv—‘F. _n. kn. Un.’
(s]mXp-a-cm-aØv hIp-∏nse F, _n, kn, Un F∂o
¢mkv cPn-kvt{S-j-\p≈ A¿l-cmb Icm-dp-Im¿°v am{Xta
Z¿Lmkv e`y-am-Ip-I-bp-≈q.)
Z¿-L-mkv kw_-‘-n®v IqSp-X¬ hnh-c-߃ Xmsg
H∏p-h-®n-cn-°p∂ DtZym-K-ÿs‚ Imcym-e-b-Øn¬ \n∂pw
{]hrØn Znh-k-ß-fn¬ Adn-bm-hp-∂-Xm-Wv. Z¿Lmkv
{]am-W-߃ \n›nX hne scm°w ]W-amtbm
aWn-tbm¿U-dmtbm AS®v At]-£n-°p∂ \n›n-X- hn-`mKw
Icm-dp-Im¿°v Xmsg H∏p-h-®n-cn-°p∂DtZym-K-ÿs‚
Imcym-e-b-Øn¬\n∂pw Ah-km\ hn¬∏\ Znhkw D®-
Xn-cn™v 1 aWn hsc e`n-°p-∂-Xm-Wv. Z¿Lmkv {]am-W-߃
23rd OCT. 2012]
IRRIGATION DEPARTMENT
216
ssIam-dm≥ ]mSp-≈-X-√. tIcf PetkN\/ s]mXp-a-cm-aØv
hIp-∏n¬ Z¿Lmkv kw_-‘n®v \ne-hn-ep≈ F√m
\n_-‘\-Ifpw CXn\pw _m[-I-ambn-cn-°pw. Z¿Lmkp
I-tfm-sSm∏w 100 hne-bp≈ ap{Z°S-em- n¬ Xøm-dm-°nb
\n›nX amXr-I-bn-ep≈ {]mY-anI DS-ºSn AS°w
sNbvXn-cn-t°-≠-Xm-Wv. {]mY-anI DS-º-Sn-bpsS amXrI
Hm^okv t\m´okv t_m¿Un¬ {]Z¿in-∏n-®n-´p-≠v.
]q¿Æ-ambpw ]qcn-∏n® {]mY-anI DS-ºSn AS°w sNbvXn-´n-
√m-ØXpw Bh-iy-amb \nc-X-{Zhyw sI´n-h-bv°m-Ø-Xp-amb
Z¿Lm-kp-Iƒ \nc-kn-°p-∂-Xm-Wv. \nc-X{Zhy-ambn FSp-°p∂
\mj-W¬ tk-hnwKvkv k¿´n-^n-°‰v/Inkm≥ hnIm-kv]{X
F∂nh Akn-Â v FIvkn-Iyq-´ohv F©n-\o-b-dpsS t]cn¬
]W-b-s∏-Sp-Øn-bn-cn-°-Ww (C-µncm hnIm-kv ]-{X-߃
\nc-X-{Z-hy-ambn kzoI-cn-°p-∂-X-√). sXmgn-emfn kl-I-cW
kwL-߃ ka¿∏n-°p∂ Z¿Lm-kn-s\msSm∏w Ah-cpsS
ssIh-i-ap≈ F√m tPmen-I-fp-sSbpw hni-Z-hn-h-c-߃
AS-ßnb enÃv kl-I-c-W- kwLw Akn-Â v
cPn-kv{Sm-dpsS k¿´n-^n-°-‰v D≠m-bn-cn-t°-≠-Xm-Wv. tIcf
\n¿ΩmW sXmgn-emfn t£a-\n[n \nb-a-Øns‚ 8/3 hIp∏v
Cu Z¿Lm-kn\pw _m[-I-am-bn-cn-°pw.
Akn-Â v FIvknIyq´ohv
F©n-\o-b-dpsS Imcym-ebw,
(H-∏v)
slUv h¿Ivkv,
Akn-Â vFIvknIyq´ohv
k_v Unhn-j≥, ]o®n.
F©n-\o-b¿.
Z¿Lmkv/]p\¿ Z¿Lmkv ]ckyw
\º¿ Un4˛Sn.F≥˛6/2012-˛13.
2012 HIvtSm-_¿ 12.
tIcf Kh¿Æ¿°pth≠n tImgn-t°mSv sNdp-InS
Pe-tkN\ hn`mKw, kq{]-≠nwKv F©n-\o-b¿ Xmsg
tN¿Øn-cn-°p∂ {]hr-Øn-Iƒ°v \n¿±njvS tbmKy-X-bp≈
AwKo-IrX Icm-dp-Im-cn¬\n∂pw a¬kcmSn-ÿm-\-Øn-ep≈
ap{Z-h®Xpw {]hr-Øn-bpsS t]cv ]pdØv Bte-J\w
sNbvXn-´p-≈-Xp-amb
Ihdp-Ifn¬
Z¿Lm-kp-Iƒ
£Wn®psIm≈p∂p-. Z¿Lm-kp-Iƒ cPn-kvt{SUv X]m¬,
kv]oUv t]mÃv F∂nh hgn am{Xta kzoI-cn-°pIbp-≈p.
sImdn-b¿ k¿∆o-kn¬ Ab-bv°p-∂tXm t\cn´v
\¬Ip-∂tXm Bb Z¿Lm-kp-Iƒ kzoI-cn-°p-∂-X-√.
X]m-¬ XI-cm-dp-aq-etam at‰m Ime-Xm-akw h∂m¬
Un∏m¿´vsa‚ v bmsXmcphn[ DØ-c-hm-Zn-Xzhpw Gs‰Sp-
°p-∂-X√. Z¿Lm-kns‚ Imem-h[n AXv kzoI-cn-°p-∂ -
A-h-km\ XobXn apX¬ 4 amkambn-cn-°pw.
{Ia
Z¿Lmkv \ºcpw
\ncX
\º¿
{]hr-Øn-bpsS t]cpw
{Zhyw
AS-¶¬ XpIbpw
Imk¿tKmUv Pn√
1
11/Sn.F≥./2012-˛13—13-˛mw [\-Imcy IΩo-j≥—
thm¿°mSn ]©m-b-Øn¬ thm¿°mSn
-hnt√-Pn¬ Acn-ßpf t]m≠ns‚
]p\-cp-≤m-cWw— 1,20,50,000
50,000
tImgn-t°mSv Pn√
2
12/Sn.F≥./2012-˛13—sh≈-s∏m° sISpXn—
Imc-t»cn ]©m-b-Øn¬ ]pXn-tbm-´n¬
tImf-\n°v kao]w sNdp-]p-g-bpsS CSXp
Ic-bn¬ sh‚ v ss]∏v {_nUvPns‚ apIƒ
`mKØv ASn-b-¥nc ]m¿iz kwc-£W
{]hr-Øn-Iƒ — 34,50,000
50,000
Z¿Lmkv {]am-W-Øns‚ hne—{Ia-\º¿ 1˛\v
18,100 + hm‰v, {Ia-\º¿ 2˛\v 5,200 + hm‰v.
IcmdpImcs‚ tbmKyX—{Ia-\º¿ 1˛\v ‘F’ ¢mkv,
{Ia-\º¿ 2˛\v ‘_n’˛bpw AXn\papIfnepw.
{]h¿Øn Xo¿t°≠ Imem-h[n—12 amkw.
Z¿Lmkv
{]am-W-ßfpw
a‰p hnh-c-ßfpw kq{]-≠nwKv
F©n-\o-b-dpsS Hm^o-kn¬ \n∂v 7˛11˛2012 apX¬ 14-˛11˛2012
D®bv°v Hcp aWnhsc, Z¿Lmkv t^md-Øns‚ hne
aWn-tbm¿U-dmtbm scm°w ]W-amtbm AS®v tcJmaqew
At]-£n-®m¬ e`n-°p-∂-Xm-Wv. Z¿Lmkv {]am-W-Øn\p
th≠n AS-bv°p∂ XpI bmsXmcp Imc-W-h-imepw XncnsI
e`n-°p-∂-X-√. Z¿Lm-kp-Iƒ 16-˛11˛2012 D®bv°ptijw
3.30 aWnhsc am{Xta kzoI-cn-°p-I-bp-≈p.
Z¿Lm-kp-Iƒ kzoI-cn-°p∂ Ah-km\ Znhkw D®bv°v
tijw 4 aWn°v k∂n-ln-X-cm-bn-´p≈ Icm-dp-Im-cpsS
km∂-n≤y-Øn¬ kq{]-≠nwKv F≥Pn-\o-btdm At±lw
A[n-Im-c-s∏-Sp-Øp∂ a‰v DtZym-K-ÿt\m Z¿Lm-kp-Iƒ
Xpd-°p-∂-Xm-Wv.
apI-fn¬ ]d-™n-cn-°p∂ GsX-¶nepw Znhkw k¿°m¿
Ah[n {]Jym-]n-°p-I-bm-sW-¶n¬ AXn\p sXm´p ]n∂o-Sp≈
{]hrØn Znhkw Sn ka-bØv Sn Z¿Lm-kp-Iƒ \S-Øp-∂-Xm-Wv.
Z¿Lmkv {]am-W-Øns‚ GI-tZi hne-bmWv apI-fn¬
sImSp-Øn-cn-°p-∂-Xv. At]£ ka¿∏n-°-ptºmƒ bYm¿∞
hne F{X-sb∂v Hm^o-kn¬ At\z-jn-t°-≠Xpw
BbXv Z¿Lmkv {]am-W-Øn-\mbn HSp-t°-≠-Xpam-Wv.
Z¿Lm-kn¬ ]s¶-Sp-°p-hm≥ B{K-ln-°p∂ Icm-dp-Im¿
(te-_¿ tIm¨{SmIvSv skmssk‰n Dƒs∏-sS) Ah-cpsS
cPn-kvt{S-j≥ k¿´n-^n-°-‰ns‚ Hdn-Pn-\¬ lmP-cm-t°-≠-Xm-Wv.
te_¿ tIm¨{SmIvSv skmssk-‰n-Iƒ Ah¿ Gs‰-Sp-Øn-cn-°p∂
]Wn-I-fpsS BsI AS-¶¬ XpI-bpsS k¿´n-^n-°‰v AXmXv
cPn-kv{Sm-dn¬ \n∂pw hmßn Z¿Lmkv t^md-Øn-\p≈
At]-£-tbm-sSm-∏w- k-a¿∏n-t°≠XmWv.
Z¿Lmkv {]am-W-߃ AwKo-IrX Icm-dp-Im¿°v am{Xw
e`n-°p-∂Xpw Ah ssIam‰w sNøm≥ ]mSn-√m-Ø-Xp-am-Ip-∂p.
\nc-X-{Zhyw ]W-ambn kzoI-cn-°p-∂-X-√. kq{]-≠nwKv
F©n-\o-bsd A[n-Im-c-s∏-Sp-Øn-bXpw Bh-iy-amb Ãmºv
]Xn®v H∏n-´-Xp-amb \nc-X-{Zhyw Z¿Lm-kn-t\msSm∏w
ka¿∏nt°-≠-Xm-Wv. Icm-dp-Im¿ Z¿Lm-kn-s\m∏w 100
hne-bp≈ ap{Z]{X-Øn¬ \n-›nX amXr-I-bn-ep≈ {]mY-anI
DS-ºSnbpw ‰n. B¿.˛5 ckoXpw IqSn ka¿∏n-t°-≠-Xm-Wv.
ta¬∏d™ hyhÿ-Iƒ ]men-°m-ØXpw t\cn´v ka¿∏n-°p-
∂-Xp-amb Z¿Lm-kp-Iƒ kzoI-cn-°p-∂-X-√.
1987-˛se tIcf \n¿ΩmW sXmgn-emfn t£a\nb-a-Ønse
8 (2) hIp∏v A\p-k-cn®v ta¬]Wn-Iƒ Gs‰-SpØv \S-Øp∂
Icm-dp-Im¿ samØw sNe-hns‚ Hcp iX-am\w tIcf \n¿ΩmW
sXmgn-emfn
t£a\n[n-bn-te°v
_n√n¬
\n∂pw
\¬tI-≠-Xm-Wv. tIcf Pe-tk-N\ hIp-∏n¬ Z¿Lm-kp-Isf
kw_-‘n®v \ne-hn-ep≈ F√m N´-ßfpw \n_-‘-\-Ifpw
Cu Z¿Lm-kn\pw _m[-I-am-bn-cn-°p-∂-Xm-Wv.
kq{]-≠nwKv F©n\obdpsS Imcym-e-bw,
sNdp-InS Pe-tk-N\ hn`mKw,
(H∏v)
Imthcn lukv, shÃvln¬ ]n. H.,
kq{]-≠nwKv
tImgn-t°m-Sv˛673 005.
F©n\ob¿.
23rd OCT. 2012]
IRRIGATION DEPARTMENT
217
TENDER NOTICE
No. DT-1/2012.
5th October 2012.
Competitive tenders in sealed covers superscribing
the name of works are invited for and on behalf of the
Governor of Kerala by the undersigned from the registered
Government contractors of eligible class category for
following works so as to reach this office on or before the
date specified. Tenders will be opened at 4.30 p. m. on
the date specified by the undersigned or authorised officer.
Tenders should be submitted so as to reach the
undersigned on or before date and time prescribed for the
work as mentioned below.
Sl.
Tender No. and
EMD
No.
Name of Works with Estimate PAC
1
1/DD/Hy/Tly/2012-13—HP II Urgent Repair
of cable way at Palapuzha River Gauge station
under Hydrology Section, Thalassery for
the year 2012-13 — 2,12,005
5,300
2
2/DD/Hy/Tly/2012-13—HP II Digging Open
Well in Hydrology Sub Division Office
compound , Thalassery civil works under
Hydrology Section, Thalassery for the year
2012-13 — 1,99,167
5,000
Cost of tender form— 500 + VAT for Sl. No. 1 and
400 + VAT for Sl. No. 2.
Last date and time of receipt of tender—3.30 pm. on
8-11-2012.
Period of completion of work—4 months.
Class of Contractor—‘D’ and above.
Tender document and other particulars can be
obtained from this office upto 8-11-2012, 1 p.m. of by on
application in writing and on payment of cost (no
refundable) either in cash or money order. Late tender will
be rejected. All other conditions are the same as for those
contracts in Kerala PWD and Irrigation Department.
tIcf Kh¿Æ¿°pth≠n sslt{Um-fPn k_v
Unhn-j≥, sU]yq´n Ub-d-IvS¿, Xe--t»-cn, IqØp-]-dº ]n. H.
Xmsg-∏-d-bp∂ {]hr-ØnIƒ°v -s]mXp-a-cm-aØv, Cdn-tK-j≥
hIp-∏pI-fnse AwKoIrX IcmdpImcn¬\n∂pw a’-c-m
Sn-ÿm-\Øn-ep≈ Z¿LmkpIƒ, {]hrØn-bpsS t]cv
Bte-J\w
sNbvXn´p≈
ap{Z-h®
Ih-dp-I-fn¬
£Wn®psIm≈p∂p. ap{Z-h® Z¿LmkpIƒ \n¿±njvS
Xob-Xnse ka-b-Øn-\Iw kzoIcn-°p∂XmWv.
{Ia
Z¿Lmkv \ºcpw
\ncX
\º¿
{]hrØn-bpsS t]cpw
{Zhyw
AS-¶¬ XpIbpw
1
1/DD/Hy/Tly/2012-13— sslt{Um-fPn
t { ] m P I v S v I I — s s l t { U m - f P n
k_v Unhn-j≥, Xe-t»-cn, IqØp-]-d-ºns‚
Iogn-ep≈ ]me-∏pg dnh¿ tKPv kvt‰-js‚
tI_nƒ thbpsS ASn-b-¥nc A‰-Ip-‰-∏Wn—
2,12,005
5,300
2
2/DD/Hy/Tly/2012-13— sslt{Um-fPn
t{]mPIvSv I I — sslt{Um-fPn
k_v Unhn-j≥ Hm^okv tImºu-≠n¬
InW¿ Ipgn-°¬ {]hrØn— 1,99,167
5,000
Z¿Lmkv t^mdØns‚ hne—{Ia-\-º¿ 1˛\v 500 +
hm‰v, {Ia-\-º¿ 2˛\v 400 + hm‰v.
Z¿LmkpIƒ kzoI-cn-°p∂ Ah-km\ Xob-Xnbpw
ka-bh-pw—8˛11-˛2012, 3.30 ]n.- Fw.
{]hrØn Xo¿t°≠ Imem-h[n—4 amkw.
Icm-dp-Im-cpsS tbm-KyX—‘Un’ ¢mkpw AXn-\p-ap-I-fn-epw.
Z¿Lmkv {]amW-w 8˛11-˛2012 D®bv°v 1 aWn-hsc Cu
Hm^o-kn¬\n∂pw hmßm-hp-∂-Xm-Wv. s]mXp-a-cm-aØv
hIp-∏nse Z¿Lm-k-pIsf kw_‘n®v \ne-hn-ep≈ F√m
\n_-‘-\-Ifpw Cu Z¿Lm-kn\pw _m[-I-ambncn-°pw.
Office of the
Deputy Director,
Hydrology Sub Division,
(Sd.)
Thalassery at Kuthuparamba.
Deputy Director.
Gaz. 20/2012/DTP (Irrigation).